WorldWideScience

Sample records for equipment supplies references

  1. Braille Literacy: Resources for Instruction, Writing Equipment, and Supplies. NLS Reference Circulars

    Science.gov (United States)

    Peaco, Freddie L., Comp.

    2004-01-01

    This reference circular lists instructional materials, supplies, and equipment currently available for learning braille, and cites sources about braille literacy. The resources given are intended to assist sighted individuals who are interested in learning braille or want to transcribe print materials into braille; instructors who teach braille;…

  2. 14 CFR 25.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 25.1441... Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, the... oxygen available in each source of supply. (d) The oxygen flow rate and the oxygen equipment for...

  3. 42 CFR 409.14 - Supplies, appliances, and equipment.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Supplies, appliances, and equipment. 409.14 Section... Hospital Services § 409.14 Supplies, appliances, and equipment. (a) Except as specified in paragraph (b) of this section, Medicare pays for supplies, appliances, and equipment as inpatient hospital or inpatient...

  4. 14 CFR 23.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 23.1441... Miscellaneous Equipment § 23.1441 Oxygen equipment and supply. (a) If certification with supplemental oxygen..., during the flight, the quantity of oxygen available in each source of supply. (d) Each required flight...

  5. 27 CFR 6.88 - Equipment and supplies.

    Science.gov (United States)

    2010-04-01

    ..., DEPARTMENT OF THE TREASURY LIQUORS âTIED-HOUSEâ Exceptions § 6.88 Equipment and supplies. (a) General. The act by an industry member of selling equipment or supplies to a retailer does not constitute a means... a price not less than the cost to the industry member who initially purchased them, and if the price...

  6. 42 CFR 409.25 - Drugs, biologicals, supplies, appliances, and equipment.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Drugs, biologicals, supplies, appliances, and... Drugs, biologicals, supplies, appliances, and equipment. (a) Drugs and biologicals. Except as specified... can obtain a continuing supply. (c) Supplies, appliances, and equipment. Except as specified in...

  7. Financing of power supply systems and pollution control equipment. Models, dimensions, developments

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, G; Raabe, G

    1988-11-01

    The authors explain the bankers' point of view of the financial and economic aspects of developments in the energy sector, discussing the financing of natural gas pipelines (Muro, Megal, etc.), of nuclear power plant construction, of projects in the oil supply sector, and of pollution abatement measures and equipment for the power industry and other industries. The different financial situations of small firms or large firms supplying pollution control equipment are discussed referring to the financing schemes to be set up, explaining among other things the profitability assessment taking into account long-term development or delays in return on capital investment from borrowed funds as induced, e.g., by delays in the licensing procedure. Future demand for borrowed capital for pollution control or nuclear power plant development is difficult to assess by the banking circles. (orig./RST).

  8. Dependence and power in healthcare equipment supply chains.

    Science.gov (United States)

    de Jong, Jurriaan L; Benton, W C

    2018-03-05

    Most healthcare organizations (HCOs) engage Group Purchasing Organizations (GPOs) as an outsourcing strategy to secure their supplies and materials. When an HCO outsources the procurement function to a GPO, this GPO will directly interact with the HCO's supplier on the HCO's behalf. This study investigates how an HCO's dependence on a GPO affects supply chain relationships and power in the healthcare medical equipment supply chain. Hypotheses are tested through factor analysis and structural equation modeling, using primary survey data from HCO procurement managers. An HCO's dependence on a GPO is found to be positively associated with a GPO's reliance on mediated power, but, surprisingly, negatively associated with a GPO's mediated power. Furthermore, analysis indicates that an HCO's dependence on a GPO is positively associated with an HCO's dependence on a GPO-contracted Original Equipment Manufacturer (OEM). HCO reliance on GPOs may lead to a buyer's dependence trap, where HCOs are increasingly dependent on GPOs and OEMs. Implications for HCO procurement managers and recommended steps for mitigation are offered. Power-dependence relationships in the medical equipment supply chain are not consistent with relationships in other, more traditional, supply chains. While dependence in a supply chain relationship typically leads to an increase in reliance on mediated power, GPO-dependent HCOs instead perceive a decrease in GPO mediated power. Furthermore, HCOs that rely on procurement service from GPOs are increasingly dependent on the OEMs.

  9. ENERGY STAR Certified Electric Vehicle Supply Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Electric Vehicle Supply Equipment that are...

  10. Designing a power supply for Nim-bin formatted equipment

    International Nuclear Information System (INIS)

    Banuelos G, L. E.; Hernandez D, V. M.; Vega C, H. R.

    2016-09-01

    From an old Nuclear Chicago power supply that was practically in the trash, was able to recover the 19 inches casing, rear connectors and the housing where the circuits were. From here all mechanical parts were cleaned and the electronic design was started to replace the original voltage and current functions of this equipment. The cards for the ±6, ±12 and ±24 voltages were designed, simulated and tested with circuitry that does not rely on specialized components or that is sold only by the equipment manufacturer. In the handling of the current by each voltage to operate, was possible to tie with the specifications of the manufacturers like Ortec or Canberra where a model of power supply gives a power of 160 Watts. Basic tests were performed to show that the behavior is very similar to commercial equipment; such as the full load regulation index and the noise level in the supply voltages. So our Nim-bin voltage source is viable for use in our institution laboratories. (Author)

  11. 48 CFR 831.7001-3 - Books, supplies, and equipment required to be personally owned.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Books, supplies, and... PROCEDURES Contract Cost Principles and Procedures 831.7001-3 Books, supplies, and equipment required to be personally owned. (a) Reimbursement for supplies (including books, equipment, or other supplies) will be made...

  12. Pengukuran Kinerja Supply Chain Dengan Pendekatan Supply Chain Operation References (SCOR)

    OpenAIRE

    Rizki Wahyuniardi; Moh. Syarwani; Ryan Anggani

    2017-01-01

    PT. Brodo Ganesha Indonesia is a national company engaged in manufacturing with the production of leather shoes. The company has many stakeholders and it is difficult to manage its supply chain, thereby affecting the effectiveness and efficiency of the company's supply chains. The research was conducted to measure the performance of supply chain by using Supply Chain Operation References (SCOR) approach. The initial hierarchy model of performance measurement is tailored to the company's condi...

  13. 34 CFR 76.661 - Equipment and supplies.

    Science.gov (United States)

    2010-07-01

    ... by the State and Its Subgrantees? Participation of Students Enrolled in Private Schools § 76.661... continuing administrative control of all equipment and supplies that the subgrantee acquires with program... in a private school for the period of time needed for the project. (c) The subgrantee shall insure...

  14. Assessment of technical equipment supply in healthcare institutions: example of Almaty

    Directory of Open Access Journals (Sweden)

    Kuralbai K Kurakbayev

    2014-01-01

    Full Text Available Background: The share of healthcare-related expenditure in the Gross Domestic Product of Kazakhstan is relatively small, and it is strategically important to restructure budgetary expenses in favor of healthcare with simultaneous redistribution of resources in accordance with changing demands and prioritization of high-quality medical care. The aim of this study was to analyze resource provision to healthcare organizations in Kazakhstan and its structure and level assessment. Materials and Methods: The study is based on a comparative assessment of technical and technological equipment of medical institutions in Almaty, Kazakhstan. We analyzed the scope and structure of the financial component of the resource base in Almaty. We carried out information processing and analysis methods, content analysis, mathematical treatment, as well as conducted case studies. Also, we held opinion poll among medical staff (specialists, managerial staff (n = 300 P for trend < 0.001 and patients (n = 210 P for trend < 0.001. Results: About 18.8% of patients do not receive medical care because of defects of the equipment, whereas 19.9% of patients claim that the reason of refusal of the provision of medical services is an equipment overload. Conclusion: Most of the respondents referred to on poor technical equipment, mismatch with the world standards of performance and competitiveness. Lack of advanced medical technology, inadequate financing, insufficient supply of domestic medical equipment, and inadequate procurement by tender were also noted. The obtained data point to the need for optimization and upgrading medical equipment at various levels of healthcare.

  15. Equipment for measuring pulsed supply of the 400 GeV CERN accelerator

    CERN Document Server

    Aubry, G; De Vries, J

    1977-01-01

    Describes the energy measuring equipment for metering the pulsed supply to the CERN proton synchrotron which is under design and development by Landis and Gyr in association with Electricity' de France. The design will take into account the shape of the load curve and the tariff structure of the supply company. It will include solid state metering, a mini-computer and telemetering equipment. (2 refs).

  16. Performance analysis of Supply Chain Management with Supply Chain Operation reference model

    Science.gov (United States)

    Hasibuan, Abdurrozzaq; Arfah, Mahrani; Parinduri, Luthfi; Hernawati, Tri; Suliawati; Harahap, Bonar; Rahmah Sibuea, Siti; Krianto Sulaiman, Oris; purwadi, Adi

    2018-04-01

    This research was conducted at PT. Shamrock Manufacturing Corpora, the company is required to think creatively to implement competition strategy by producing goods/services that are more qualified, cheaper. Therefore, it is necessary to measure the performance of Supply Chain Management in order to improve the competitiveness. Therefore, the company is required to optimize its production output to meet the export quality standard. This research begins with the creation of initial dimensions based on Supply Chain Management process, ie Plan, Source, Make, Delivery, and Return with hierarchy based on Supply Chain Reference Operation that is Reliability, Responsiveness, Agility, Cost, and Asset. Key Performance Indicator identification becomes a benchmark in performance measurement whereas Snorm De Boer normalization serves to equalize Key Performance Indicator value. Analiytical Hierarchy Process is done to assist in determining priority criteria. Measurement of Supply Chain Management performance at PT. Shamrock Manufacturing Corpora produces SC. Responsiveness (0.649) has higher weight (priority) than other alternatives. The result of performance analysis using Supply Chain Reference Operation model of Supply Chain Management performance at PT. Shamrock Manufacturing Corpora looks good because its monitoring system between 50-100 is good.

  17. Pengukuran Kinerja Supply Chain Dengan Pendekatan Supply Chain Operation References (SCOR

    Directory of Open Access Journals (Sweden)

    Rizki Wahyuniardi

    2017-12-01

    Full Text Available PT. Brodo Ganesha Indonesia is a national company engaged in manufacturing with the production of leather shoes. The company has many stakeholders and it is difficult to manage its supply chain, thereby affecting the effectiveness and efficiency of the company's supply chains. The research was conducted to measure the performance of supply chain by using Supply Chain Operation References (SCOR approach. The initial hierarchy model of performance measurement is tailored to the company's condition to measure its supply chain performance, while the normalization of Snorm De Boer serves to equalize the value of the matrix used as the measurement indicator. The level of importance of performance attributes is measured by weighting with subjective questionnaires. Value of performance attribute obtained reliability 19,74, responsiveness 16,91, agility 11,00; and asset management 12.26. The total performance score of 59.90. This value indicates that the performance of the supply chain is in an average position.

  18. Supply of equipment and components, materials of dedicated commercial grade, other services

    International Nuclear Information System (INIS)

    Perdices, D.; Perez Medina, E.

    2014-01-01

    The following article describes the course of action of Tecnatom as Procurement Agent and Manufacturing Manager for the supply materials, equipment and components for the Spanish Nuclear Power Plants. We have devoted a special mention to the supply of dedicated commercial grade items (CGI), bringing together the services of Manufacturing Manager, Engineering service and testing facilities, simplifying the control of the supply chain with total warranty. (Author)

  19. 44 CFR 208.37 - Reimbursement for equipment and supply costs incurred during Activation.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Reimbursement for equipment... SEARCH AND RESCUE RESPONSE SYSTEM Response Cooperative Agreements § 208.37 Reimbursement for equipment and supply costs incurred during Activation. (a) Allowable costs. DHS will reimburse costs incurred...

  20. The effects of competitive electricity supply in the UK on metering equipment

    International Nuclear Information System (INIS)

    Dick, A.

    1996-01-01

    Requirements for metering of competitive supply, following privatisation of the UK Electricity Industry in 1989, have driven the design of metering equipment in a way which was not foreseen at that time. Metering equipment used for implementing the competitive market so far has been designed to new uniform national specifications and has used commercially available communications systems to automatically collect data. In order to implement full competition down to the domestic level as from 1998, a new approach is thought to be necessary. The major influences on meter design, equipment now being used, are described, future equipment and communications options, are considered. (author)

  1. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)

  2. Uninterruptible power supply model of independent voltage inverter of NPP electrical equipment

    International Nuclear Information System (INIS)

    Rozhkov, V.V.; Ajdaralieva, V.Eh.

    2010-01-01

    A package of main transforming units models of advanced uninterruptible power supply systems of NPP electrical equipment was developed. The package of models allows investigating the basic modes of uninterruptible power supply systems operation by computer modeling. Simulation results were presented. Recommendations on choice of parameters of power circuit elements as well as on diagnostics and adjustment of regulators of converters control systems were given [ru

  3. 21 CFR 864.2240 - Cell and tissue culture supplies and equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cell and tissue culture supplies and equipment. 864.2240 Section 864.2240 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES HEMATOLOGY AND PATHOLOGY DEVICES Cell And Tissue Culture Products...

  4. Equipment-independent reference values for dopamine transporter imaging with 123I-FP-CIT

    International Nuclear Information System (INIS)

    Koch, W.; Hornung, J.; Poepperl, G.; Tatsch, K.; Hamann, C.

    2007-01-01

    Aim: Reliable reference values are helpful to interpret and compare the results of dopamine transporter imaging with SPECT. Since semi-quantitative reference values cannot be easily transferred between imaging equipments, this study aimed to establish equipment independent normal values for the true striatal binding of 123 I-FP-CIT. Patients, methods: Specific striatal FP-CIT binding of 6 healthy volunteers and 26 patients with essential tremor were used to generate a reference range by applying an equipment specific resolution dependent factor to compensate for recovery effects. This factor has been determined previously by a series of standardized phantom measurements of an anthropomorphic basal ganglia phantom. Herewith, the resulting DAT binding values represent the expected true specific binding in the striatum. Results: On average, true specific striatal binding was 5.83 ± 0.96 in healthy controls, 5.25 ± 0.67 in patients with essential tremor and 5.36 ± 0.75 in the entire study cohort. Conclusion: These preliminary results may serve as a basis for the generation of a generally accepted equipment independent reference range for dopamine transporter imaging with 123 I-FP-CIT. By a simple phantom measurement that can be accomplished within one day factors related to specific imaging equipment and processing can be corrected for, resulting in specific binding values which may enable a more standardized interpretation of dopamine transporter scans. (orig.)

  5. Pengukuran Performansi Supply Chain Dengan Menggunakan Supply Chain Operation Reference (Scor) Berbasis Analytical Hierarchy Process (Ahp) Dan Objective Matrix (Omax)

    OpenAIRE

    Hanugrani, Nikita; Setyanto, Nasir Widha; Efranto, Remba Yanuar

    2013-01-01

    PT. Indonesian Tobacco merupakan salah satu Perusahaan rokok yang telah menerapkan konsep Supply Chain Management untuk mengatur proses aliran material. Selama berjalannya Supply Chain Management tersebut, Perusahaan belum pernah melakukan pengukuran terhadap performansi supply chain yang melibatkan semua pihak yang terkait. Metode yang digunakan untuk mengukur performansi supply chain adalah Supply Chain Operation Reference (SCOR). SCOR merupakan suatu model acuan proses untuk operasi supply...

  6. Charging equipment. Ladegeraet

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, E

    1981-09-17

    The invention refers to a charging equipment, particularly on board charging equipment for charging traction batteries of an electric vehicle from the AC mains supply, consisting of a DC converter, which contains a controlled power transistor, a switching off unloading circuit and a power transmitter, where the secondary winding is connected in series with a rectifier diode, and a smoothing capacitor is connected in parallel with this series circuit. A converter module is provided, which consists of two DC voltage converters, whose power transistors are controlled by a control circuit in opposition with a phase displacement of 180/sup 0/.

  7. Medicare Referring Provider (DMEPOS) Data CY2013

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) released a new dataset, the Referring Provider Durable Medical Equipment, Prosthetics, Orthotics and Supplies...

  8. 44 CFR 206.6 - Donation or loan of Federal equipment and supplies.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Donation or loan of Federal... Donation or loan of Federal equipment and supplies. (a) In any major disaster or emergency, the... governments for use and distribution by them for the purposes of the Stafford Act. (b) A donation or loan may...

  9. Combined prediction model for supply risk in nuclear power equipment manufacturing industry based on support vector machine and decision tree

    International Nuclear Information System (INIS)

    Shi Chunsheng; Meng Dapeng

    2011-01-01

    The prediction index for supply risk is developed based on the factor identifying of nuclear equipment manufacturing industry. The supply risk prediction model is established with the method of support vector machine and decision tree, based on the investigation on 3 important nuclear power equipment manufacturing enterprises and 60 suppliers. Final case study demonstrates that the combination model is better than the single prediction model, and demonstrates the feasibility and reliability of this model, which provides a method to evaluate the suppliers and measure the supply risk. (authors)

  10. Guide to Effective Business Practices in Buying School Supplies, Instructional Materials, Equipment and Services.

    Science.gov (United States)

    Association of School Business Officials International, Reston, VA.

    This guide to effective business practices is intended to assist schools in establishing general policies and procedures for buying supplies, instructional materials, equipment, and services. Federal, state, and local laws must be considered in addition to the recommendations made in this report. Practical guidelines are given for selecting…

  11. Sustainable Federal Fleets: Deploying Electric Vehicles and Electric Vehicle Supply Equipment

    Energy Technology Data Exchange (ETDEWEB)

    2017-01-01

    The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for Sustainable Federal Fleets. To assist agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams.

  12. Personal Protective Equipment Supply Chain: Lessons Learned from Recent Public Health Emergency Responses.

    Science.gov (United States)

    Patel, Anita; D'Alessandro, Maryann M; Ireland, Karen J; Burel, W Greg; Wencil, Elaine B; Rasmussen, Sonja A

    Personal protective equipment (PPE) that protects healthcare workers from infection is a critical component of infection control strategies in healthcare settings. During a public health emergency response, protecting healthcare workers from infectious disease is essential, given that they provide clinical care to those who fall ill, have a high risk of exposure, and need to be assured of occupational safety. Like most goods in the United States, the PPE market supply is based on demand. The US PPE supply chain has minimal ability to rapidly surge production, resulting in challenges to meeting large unexpected increases in demand that might occur during a public health emergency. Additionally, a significant proportion of the supply chain is produced off-shore and might not be available to the US market during an emergency because of export restrictions or nationalization of manufacturing facilities. Efforts to increase supplies during previous public health emergencies have been challenging. During the 2009 H1N1 influenza pandemic and the 2014 Ebola virus epidemic, the commercial supply chain of pharmaceutical and healthcare products quickly became critical response components. This article reviews lessons learned from these responses from a PPE supply chain and systems perspective and examines ways to improve PPE readiness for future responses.

  13. Proposal to negotiate the renewal of two blanket purchase contracts for the supply of automation systems and fieldbus equipment

    CERN Document Server

    2005-01-01

    This document concerns the renewal of two blanket purchase contracts for the supply of automation systems and fieldbus equipment for the CERN accelerators, technical services and experiments. The Finance Committee is invited to agree to the negotiation of the renewal of two blanket purchase contracts with SCHNEIDER ELECTRIC (FR) and SIEMENS SUISSE (CH) for the supply of automation systems and fieldbus equipment for a period of three years. The total annual amount covering both contracts will not exceed 3 000 000 Swiss francs, subject to revision for inflation.

  14. Medicare program; replacement of reasonable charge methodology by fee schedules for parenteral and enteral nutrients, equipment, and supplies. Final rule.

    Science.gov (United States)

    2001-08-28

    This final rule implements fee schedules for payment of parenteral and enteral nutrition (PEN) items and services furnished under the prosthetic device benefit, defined in section 1861(s)(8) of the Social Security Act. The authority for establishing these fee schedules is provided by the Balanced Budget Act of 1997, which amended the Social Security Act at section 1842(s). Section 1842(s) of the Social Security Act specifies that statewide or other area wide fee schedules may be implemented for the following items and services still subject to the reasonable charge payment methodology: medical supplies; home dialysis supplies and equipment; therapeutic shoes; parenteral and enteral nutrients, equipment, and supplies; electromyogram devices; salivation devices; blood products; and transfusion medicine. This final rule describes changes made to the proposed fee schedule payment methodology for these items and services and provides that the fee schedules for PEN items and services are effective for all covered items and services furnished on or after January 1, 2002. Fee schedules will not be implemented for electromyogram devices and salivation devices at this time since these items are not covered by Medicare. In addition, fee schedules will not be implemented for medical supplies, home dialysis supplies and equipment, therapeutic shoes, blood products, and transfusion medicine at this time since the data required to establish these fee schedules are inadequate.

  15. Myopic versus Far-Sighted Behaviors in Dynamic Supply Chain Coordination through Advertising with Reference Price Effect

    Directory of Open Access Journals (Sweden)

    Yafei Zu

    2017-01-01

    Full Text Available To better understand the different effects of the myopic and far-sighted behaviors on the advertising coordination in dynamic supply chain, this paper takes the reference price effect into consideration and formulates four differential game models for the two-level supply chain composed of a manufacturer and a retailer in the situation of Stackelberg game. In our models, the market demand is assumed to be affected by the goodwill, reference price, and the advertising investment, in which the advertising investment can promote the construction of goodwill and such goodwill can further enhance the reference price. The results show that the participating members in the supply chain should invest more in advertisement to improve the goodwill and the relative reference price reflected in the minds of consumers. A far-sighted manufacturer will invest more in the advertisement and charge a higher wholesale price regardless of the behavior choice of the retailer. However, such kind of ignorance leads to different results on the retail pricing strategies of the retailer. The numerical analyses are given in the end to verify the effectiveness of the conclusions which provide the theoretical support to the dynamic supply chain coordination in practice.

  16. Wireless Power Supply via Coupled Magnetic Resonance for on-line Monitoring Wireless Sensor of High-voltage Electrical Equipment

    DEFF Research Database (Denmark)

    Xingkui, Mao; Qisheng, Huang; Yudi, Xiao

    2016-01-01

    On-line monitoring of high-voltage electrical equipment (HV-EE) aiming to detect faults effectively has become crucial to avoid serious accidents. Moreover, highly reliable power supplies are the key component for the wireless sensors equipped in such on-line monitoring systems. Therefore......, in this paper, the wireless power supply via coupled magnetic resonance (MR-WPS) is proposed for powering the wireless sensor and the associated wireless sensor solution is also proposed. The key specifications of the MR-WPS working in switchgear cabinet with a harsh operation environment are analyzed...... power is able to be delivered to the wireless sensor through the designed MR-WPS, and therefore the theoretical analysis and design is verified....

  17. Partners in qualified equipment supply

    International Nuclear Information System (INIS)

    Rygg, D.E.; O'Hare, G.J.

    1993-01-01

    Industry initiatives have been taken to improve procurement practices and commercial dedication programs, formation of procurement engineering groups, emphasis on product quality, and increased engineering involvement in procurement and maintenance of qualified equipment. This poses new challenges for many licensees in terms of resources, product knowledge, and access to information normally held proprietary by equipment suppliers. Alternative approaches to future licensee/Westinghouse relationships which will allow licensees to adapt to the changing environment are discussed. 2 figs

  18. Improvements in the equipment for determination of Kr-85 with the reference method

    International Nuclear Information System (INIS)

    Heras Iniquez, M.C.; Perez Garcia, M.M.

    1983-01-01

    A new equipment for Kr-85 separation and their cryogenic chromatographic concentration is described, which presents some advantages respect the equipment used as reference. The new apparatus, made with metallic elements, is based on the method of concentration and separation previously described but presents easier control, faster chromatographic separations and without loosed of efficiency and reproducibility that the previous one. The concentration and separation procedure for Kr-85 and a comparative study between both apparatus is described. Also the efficiency of the method is obtained experimentally. (Author)

  19. Designing a power supply for Nim-bin formatted equipment; Diseno de una fuente de alimentacion para equipos con formato Nim-bin

    Energy Technology Data Exchange (ETDEWEB)

    Banuelos G, L. E.; Hernandez D, V. M.; Vega C, H. R., E-mail: lebluis2012@hotmail.com [Universidad Autonoma de Zacatecas, Unidad Academica de Estudios Nucleares, Cipres No. 10, Fracc. La Penuela, 98060 Zacatecas, Zac. (Mexico)

    2016-09-15

    From an old Nuclear Chicago power supply that was practically in the trash, was able to recover the 19 inches casing, rear connectors and the housing where the circuits were. From here all mechanical parts were cleaned and the electronic design was started to replace the original voltage and current functions of this equipment. The cards for the ±6, ±12 and ±24 voltages were designed, simulated and tested with circuitry that does not rely on specialized components or that is sold only by the equipment manufacturer. In the handling of the current by each voltage to operate, was possible to tie with the specifications of the manufacturers like Ortec or Canberra where a model of power supply gives a power of 160 Watts. Basic tests were performed to show that the behavior is very similar to commercial equipment; such as the full load regulation index and the noise level in the supply voltages. So our Nim-bin voltage source is viable for use in our institution laboratories. (Author)

  20. Business process modelling in demand-driven agri-food supply chains : a reference framework

    NARCIS (Netherlands)

    Verdouw, C.N.

    2010-01-01

    Keywords: Business process models; Supply chain management; Information systems; Reference information models; Market orientation; Mass customisation; Configuration; Coordination; Control; SCOR; Pot plants; Fruit industry

    Abstract

    The increasing volatility and diversity of

  1. Deploying Electric Vehicles and Electric Vehicle Supply Equipment: Tiger Teams Offer Project Assistance for Federal Fleets

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-02

    To assist federal agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory’s EVSE Tiger Teams.

  2. Determining the total cost of reverse supply chain operations for original equipment manufacturers

    DEFF Research Database (Denmark)

    Larsen, Samuel Brüning; Jacobsen, Peter

    2014-01-01

    When original equipment manufacturers (OEM) examine whether or not to invest in a reverse supply chain (RSC), managers need insight into not only the cost savings and new revenue streams the RSC enables, but also the total cost of the RSC itself. Using case study research the study examines what...... cost parameters constitute the total cost (TC) of the RSC. The specific RSC that the study seeks the TC for consists of 1) end-product refurbishing, 2) component refurbishing, and 3) sales of used materials back to original suppliers or independent recyclers for materials recycling....

  3. Enhancing reactor availability factor by diagnostic monitoring and data acquisition of electrical equipments

    International Nuclear Information System (INIS)

    Singh, G.

    2006-01-01

    Electrical energy has made significant contribution to rapid growth of industrial activity in the country. Development and improvement of energy conversion devices or electrical apparatus have supported the growth. Reliability is probably the most important factor in electrical supply system, not only to give uninterrupted service but to provide an economic supply. Regular diagnostic testing of electrical equipments will make a significant contribution to the reliability of electrical supply. The purpose of diagnostic monitoring is to recognize the development of faults at an early stage, which consequently allows greater freedom to schedule the outages resulting in lower downtime and lower capitalized losses. The insulation constitutes the heart of any electrical/power equipment. The insulation in power equipment in normal condition undergoes certain changes in the physical, chemical, electrical and mechanical properties. The change with respect to time in the presence of an influencing factor, more often a stress (electrical) is referred to as ageing. The deterioration of insulating material plays an important role in the assessing the condition of electrical equipments. The systematic diagnostic tests are also part of the maintenance program to ensure the continued serviceability of electrical equipments, by replacing or repairing the components likely to fail, as revealed by the test. Diagnostic tests are carried out on various electrical equipments for detection of incipient fault, location and judging their severity. (author)

  4. Progress of the ITER NBI acceleration grid power supply reference design

    International Nuclear Information System (INIS)

    Toigo, Vanni; Zanotto, Loris; Bigi, Marco; Decamps, Hans; Ferro, Alberto; Gaio, Elena; Gutiérrez, Daniel; Tsuchida, Kazuki; Watanabe, Kazuhiro

    2013-01-01

    Highlights: ► This paper reports the progress in the reference design of the Acceleration Grid Power Supply (AGPS) of the ITER Neutral Beam Injector (NBI) ► A critical revision of the main design choices is presented in light of the definition of some key interface parameters between the two AGPS subsystems. ► The verification of the fulfillment of the requirements in any operational conditions is reported and discussed. -- Abstract: This paper reports the progress in the reference design of the Acceleration Grid Power Supply (AGPS) of the ITER Neutral Beam Injector (NBI). The design of the AGPS is very challenging, as it shall be rated to provide about 55 MW at 1 MV dc in quasi steady-state conditions; moreover, the procurement of the system is shared between the European Domestic Agency (F4E) and the Japanese Domestic Agency (JADA), resulting in additional design complication due to the need of a common definition of the interface parameters. A critical revision of the main design choices is presented also in light of the definition of some key interface parameters between the two AGPS subsystems. Moreover, the verification of the fulfillment of the requirements in any operational conditions taking into account the tolerance of the different parameters is also reported and discussed

  5. Static and Dynamic Pricing Strategies in a Closed-Loop Supply Chain with Reference Quality Effects

    Directory of Open Access Journals (Sweden)

    Zhichao Zhang

    2018-01-01

    Full Text Available Remanufacturing of returned products has been increasingly recognized in industries as an effective approach to face environmental responsibility, government regulations, and increased awareness of consumers. In this paper, we address a closed-loop supply chain (CLSC in which the manufacturer produces the brand-new products, as well as the remanufactured goods while the retailer sells these products to customers. We consider several different scenarios: the manufacturer and the retailer adopt a steady-state price or a dynamic price with reference quality effects in a centralized case; either, neither or both the manufacturer and the retailer price dynamically with reference quality effects, respectively, in a decentralized model. We solve the problem with the retailer recycling the sold copies and deduce the optimal pricing strategies while the manufacturer in charge of recovering the used items in such a CLSC. The result shows that dynamic pricing strategies are much more profitable for the supply chain and its members when compared with pricing statically; the dynamic pricing strategies with time-varying quality characterized by reference quality are more suited to a long-term and cooperative closed-loop supply chain. Moreover, the optimal recycling fraction relies on the recovery cost coefficient and proves to be uniform despite adopting a dynamic price and quality in all distinct cases.

  6. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Science.gov (United States)

    2010-07-01

    ... portable or mobile equipment from low-voltage three-phase resistance grounded power systems shall contain... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables supplying power to low-voltage... STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Low- and Medium-Voltage...

  7. The reference model of supply chain operational controlling in value management

    Directory of Open Access Journals (Sweden)

    2010-03-01

    Full Text Available The systemic approach of the controlling function to supporting the operations management results from its complex analysis of the supply chain business and operating results and from influencing the operations management factors - products, processes and resources that determine the achieved result (revenues, costs, profitability and assets turnover as well as the return on invested capital. All product features which stand for customer value and its competitiveness are the basis for designing, planning and controlling the interconnected processes responsible for manufacturing and delivery of products. The effectiveness of methods applied in developing products, processes and resources depends on the precise analysis and appraisal of the operating conditions that justify their application. Supporting the operations management, focused on the product value and improving the company's financial result, apart from financial, technical and economic analyses requires transferring the product value to activities control methods and to developing the resources in the product supply chain already at the stage of planning. As a result of an analysis of requirements supporting the development of processes and resources in the supply chain, a reference model of operational controlling in product value management was developed. The multicriterion selection and appropriate application of material flow management methods in the supply chain is each time preceded by an operating and financial analysis as well as by an appraisal of operating conditions that influence the choice of control methods.

  8. Supply of equipment and components, materials of dedicated commercial grade, other services; Suministro de equipos y respuestos. Materiales de grado comercial dedicados. Otros servicios

    Energy Technology Data Exchange (ETDEWEB)

    Perdices, D.; Perez Medina, E.

    2014-10-01

    The following article describes the course of action of Tecnatom as Procurement Agent and Manufacturing Manager for the supply materials, equipment and components for the Spanish Nuclear Power Plants. We have devoted a special mention to the supply of dedicated commercial grade items (CGI), bringing together the services of Manufacturing Manager, Engineering service and testing facilities, simplifying the control of the supply chain with total warranty. (Author)

  9. An economic-mathematical model for optimization of the electrical equipment maintenance parameters of the Bobov Dol mine power supply system

    International Nuclear Information System (INIS)

    Shishov, S.

    1990-01-01

    The model proposed helps to ground the quantitative evaluation of the maintenance parameters of the electrical equipment of the coal mine. In the process of simulation an assumption is made that no additional capital investments are needed - only the existing situation of the electric supply system is considered and the effect of the measures taken to increase its reliability. The model takes into account the annual operating expenses, the downtime costs, the power not supplied to the user due to breakdowns, the average total outage duration; the breakdowns intensity, the average time for serviceability restoration. The model is based on the statistical data from the equipment operation for a period of 3 years, as well as on the economical standards acting in this mine. The outage expenses calculations of two units of the Bobov Dol mine are presented as an illustrative example of the model testing. The model is realized as a software product written on PL-1. It can also simulate the effect of the personnel number as well as the annual reserves of spare parts of various equipment's makes. 2 tabs, 6 refs

  10. Maintenance management of emergency power supply equipment (uninterruptible power supply) in Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Nishida, Kyosuke; Hiyama, Hisao; Shibata, Satomi; Iwasaki, Shogo; Inami, Shinichi

    2009-01-01

    Uninterruptible power supply systems are installed in the Tokai reprocessing plant in preparation for the emergency case that the commercial power supply is stopped by an accidental or intentional interruption in the supply of electricity. The uninterruptible power supply system particularly provides a temporary power source to the important devices for the radiation control of nuclear critical monitoring in the plant. Thus, the system is potentially important and essential for nuclear plants. The paper reports the current activities such as regular inspections, replacement of parts and system update, to maintain the function of uninterruptible power supply systems. (author)

  11. Evaluation of critical indicators in the process of acquiring supplies and services LAC-UFPE

    Science.gov (United States)

    Caetano, V. F.; Ferreira, C. V.; dos Santos, M. J.; Honorato, F. A.

    2015-01-01

    In laboratories linked to public universities and accredited by the NBR ISO/IEC 17025, to meet efficiently item 4.6 (procurement of supplies and services) is a challenge that can be accomplished by programming based on historical purchases and services. In this study, we evaluated the critical procurement items to meet the quality management system of the LAC-UFPE: reagents, certified reference material, of equipment parts, maintenance and calibration of equipment and instruments. It was found that the most critical item is the certified reference material, the purchase or repair of which must be expedited within 125 days prior to the receipt to occur within the desired period.

  12. Specific properties of the electrical equipment in the nuclear steam supply system; Specificnosti elektricne opreme u primarnom djelu nuklearne elektrane

    Energy Technology Data Exchange (ETDEWEB)

    Smiljanic, D [Rade Koncar Institut, Zagreb (Yugoslavia)

    1979-07-01

    The paper presents description of reactor coolant pump motor in the primary coolant loop. The motor is treated as a representative of all electrical equipment in the nuclear steam supply system that has to meet all the requirements concerning reliability, minimum maintenance, radiation, seismic etc. (author)

  13. Ion beam stabilization in ion implantation equipment

    International Nuclear Information System (INIS)

    Pina, L.

    1973-01-01

    The results are presented of experimental efforts aimed at ion beam current stabilization in an equipment for ion implantation in solids. The related problems of power supplies are discussed. Measured characteristics of laboratory equipment served the determination of the parameters to be required of the supplies as well as the design and the construction of the supplies. The respective wiring diagram is presented. (J.K.)

  14. Feedstock and Conversion Supply System Design and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Jacobson, J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mohammad, R. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Cafferty, K. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kenney, K. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Searcy, E. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hansen, J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The success of the earlier logistic pathway designs (Biochemical and Thermochemical) from a feedstock perspective was that it demonstrated that through proper equipment selection and best management practices, conventional supply systems (referred to in this report as “conventional designs,” or specifically the 2012 Conventional Design) can be successfully implemented to address dry matter loss, quality issues, and enable feedstock cost reductions that help to reduce feedstock risk of variable supply and quality and enable industry to commercialize biomass feedstock supply chains. The caveat of this success is that conventional designs depend on high density, low-cost biomass with no disruption from incremental weather. In this respect, the success of conventional designs is tied to specific, highly productive regions such as the southeastern U.S. which has traditionally supported numerous pulp and paper industries or the Midwest U.S for corn stover.

  15. Operation of SST-1 TF power supply during SST-1 campaigns

    International Nuclear Information System (INIS)

    Sharma, Dinesh Kumar; Vora, Murtuza M.; Ojha, Amit; Singh, Akhilesh Kumar; Bhavsar, Chirag

    2015-01-01

    Highlights: • SST-1 TF power supply is 12 pulse SCR converter circuit. • TF power supply protection, measurement and control scheme are explained. • Quench, emergency and normal shot process is explained and results of SST-1 campaigns are shown. • Dynamic control of TF current. • The paper shows the results of last ten SST-1 campaigns. - Abstract: SST-1 TF power supply provides the direct current for the required magnetic field of TF coil. TF power supply includes transformer, 12-pulse converter, bus bar, water-cooled cable, protection and measuring equipments, and isolator, VME DAC system and GUI software. TF power supply is operated through GUI software built in TCL/Tk. VME DAC system monitors the parameters, provides On/Off commands, voltage and current references and initiates predefined reference to emergency shutdown. The emergency shutdown is hardwired to TF power supply from central control. During quench power supply converter opens DCCB and dump resistor is connected in the circuit and VME DAC system acquires bus bar voltage, dump voltage and dump current. Operation of TF power supply also requires monitoring of SCR and transformer temperature and water flow rate of water-cooled cable during high current long pulse shot. Before start up of TF power supply a quench simulation is performed to check the readiness of protection. This paper describes pre startup operation, normal shot operation, emergency and quench process, dynamic control and complete shutdown operation of TF power supply.

  16. Operation of SST-1 TF power supply during SST-1 campaigns

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, Dinesh Kumar, E-mail: dinesh@ipr.res.in; Vora, Murtuza M.; Ojha, Amit; Singh, Akhilesh Kumar; Bhavsar, Chirag

    2015-10-15

    Highlights: • SST-1 TF power supply is 12 pulse SCR converter circuit. • TF power supply protection, measurement and control scheme are explained. • Quench, emergency and normal shot process is explained and results of SST-1 campaigns are shown. • Dynamic control of TF current. • The paper shows the results of last ten SST-1 campaigns. - Abstract: SST-1 TF power supply provides the direct current for the required magnetic field of TF coil. TF power supply includes transformer, 12-pulse converter, bus bar, water-cooled cable, protection and measuring equipments, and isolator, VME DAC system and GUI software. TF power supply is operated through GUI software built in TCL/Tk. VME DAC system monitors the parameters, provides On/Off commands, voltage and current references and initiates predefined reference to emergency shutdown. The emergency shutdown is hardwired to TF power supply from central control. During quench power supply converter opens DCCB and dump resistor is connected in the circuit and VME DAC system acquires bus bar voltage, dump voltage and dump current. Operation of TF power supply also requires monitoring of SCR and transformer temperature and water flow rate of water-cooled cable during high current long pulse shot. Before start up of TF power supply a quench simulation is performed to check the readiness of protection. This paper describes pre startup operation, normal shot operation, emergency and quench process, dynamic control and complete shutdown operation of TF power supply.

  17. Financing the End-to-end Supply Chain: A Reference Guide to Supply Chain Finance

    OpenAIRE

    Templar, Simon; Hofmann, Erik; Findlay, Charles

    2016-01-01

    Financing the End to End Supply Chain provides readers with a real insight into the increasingly important area of supply chain finance. It demonstrates the importance of the strategic relationship between the physical supply of goods and services and the associated financial flows. The book provides a clear introduction, demonstrating the importance of the strategic relationship between supply chain and financial communities within an organization. It contains vital information on how supply...

  18. Results from Operational Testing of the Siemens Smart Grid-Capable Electric Vehicle Supply Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Brion [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    The Idaho National Laboratory conducted testing and analysis of the Siemens smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from Siemens for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the Siemens smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionality testing, abnormal conditions testing, and charging of a plug-in vehicle.

  19. Controlled power supply for isotopes separator

    International Nuclear Information System (INIS)

    Lavaitte, A.; Pottier, J.

    1953-01-01

    This equipment is destined to equip the separator of isotopes who is the subject of the CEA report n 138. It includes: - a controlled power supply in voltage. - a controlled power supply in current. The spectra of fluctuations of these assembly is different in the two cases. (authors) [fr

  20. Heavy oil supply economics and supply response to low oil prices

    International Nuclear Information System (INIS)

    Fisher, L.

    1999-01-01

    The dynamics of the heavy oil industry are examined, including prices, market demand, supply and supply costs. Price assumptions are provided for the reference case oil price (west Texas intermediate at Cushing). Supply cost methodology is explained. Capital and operating costs for various heavy oil and synthetic sources are derived from modeling results. The range of supply costs for heavy oil and bitumen from various sources, supply costs in terms of reference case market values and in terms of 1995-1996 average market values for Bow River crude, are derived. The CERI long term supply forecast model is explained. Western Canada upstream oil and gas cash flow and capital expenditures, eastern Canada exploration and expenditures by hydrocarbon type, and Canadian heavy oil and bitumen production based on reference case prices are estimated. Based on these projections the outlook for heavy oil at reference case prices for better than average quality resources is judged to be economic. Lower quality resources will require technology gains for successful commercialization. SAGD is a likely candidate in this respect. Again based on reference prices, production is forecast to decline by 100 Kb/d over the next five years. Diluent supply is considered to be adequate throughout the forecast period. As far as thermal bitumen is concerned, the growth could, in fact, exceed the projection, but if so, more upgrading will be required. 11 figs

  1. Emergency water supply facility for nuclear reactor

    International Nuclear Information System (INIS)

    Karasawa, Toru

    1998-01-01

    Water is stored previously in an equipment storage pit disposed on an operator floor of a reactor building instead of a condensate storage vessel. Upon occurrence of an emergency, water is supplied from the equipment storage pit by way of a sucking pipeline to a pump of a high pressure reactor core water injection circuit and a pump of a reactor-isolation cooling circuit to supply water to a reactor. The equipment storage pit is arranged in a building so that the depth thereof is determined to keep the required amount of water by storing water at a level lower than the lower end of a pool gate during normal operation. Water is also supplied from the equipment storage pit by way of a supply pipeline to a spent fuel storage pool on the operation floor of the reactor building. Namely, water is supplied to the spent fuel storage pool by a pump of a fuel pool cooling and cleaning circuit. This can eliminate a suppression pool cleaning circuit. (I.N.)

  2. Challenges and Opportunities for Transactive Control of Electric Vehicle Supply Equipment. A Reference Guide

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Xin [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Meintz, Andrew [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-07-29

    This report seeks to characterize the opportunities and challenges that arise in developing a transactive control strategy for grid-EVSE integration in various use-case scenarios in a way that provides end-user, energy market, grid, and societal benefits. A detailed review provides information about EVSE integration market trends and stakeholder activities. This is followed by an exploration of value proposition for transactive control of EVSE at both the home scale and the building/campus scale. This report will serve as a reference guide for stakeholders in the grid-EVSE integration area, illustrate potential implementations, and identify a high-value research project for overcoming the barriers and unlocking the benefits of transactive controls of EVSE. While it is not intended to specify the technical details of the transactive control solution, the report contains a list of use cases describing potential applications of transactive control of EVSE, barriers to implementing these applications, and research and development (R&D) opportunities to overcome the barriers. The use cases of transactive control of EVSE are listed in Table ES1.

  3. Town engineers in South Africa before 1910, with reference to water supply

    Directory of Open Access Journals (Sweden)

    Harri Mäki

    2013-07-01

    Full Text Available This article looks at the town engineers in South Africa prior to Union in 1910. It briefly examines the growth in the number of municipalities and town engineers in the country in this period and investigates the background and training of these engineers; why municipalities decided to appoint an engineer; and what kind of appointment processes were followed. Finally the relations between engineers and town councils and the prevailing circumstances at the end of the engineers’ tenures is studied. The article also presents ten specific cases which have reference to the development of water supply. It emerges that most early town engineers received training via apprenticeship for the positions they held, and that there was added pressure from elected councillors in municipalities who were prone to monitor assiduously how officials were spending public money. It is also clear that engineers who did not have earlier municipal experience were bound to have problems in their interaction with town councillors. Keywords: Municipal history, civil engineering, water supply, sanitation, Cape Colony, Natal, Orange Free State, Transvaal Disciplines: History, Engineering, Public Management

  4. Proposal for the award of a blanket contract for the supply and installation of automatic fire-detection and emergency-evacuation equipment

    CERN Document Server

    2003-01-01

    This document concerns the award of a blanket contract for the supply and installation of automatic fire-detection and emergency-evacuation equipment. Following a market survey carried out among 54 firms in ten Member States, a call for tenders (IT-3090/ST) was sent on 29 August 2003 to one firm and four consortia in five Member States. By the closing date, CERN had received four tenders from four consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with the consortium HEKATRON (DE) - SOTEB (FR), the lowest bidder, for the supply and installation of automatic fire-detection and emergency-evacuation equipment for a total amount not exceeding 1 900 000 euros (2 946 650 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 70%; FR - 30%.

  5. Results from the Operational Testing of the Eaton Smart Grid Capable Electric Vehicle Supply Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Brion [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    The Idaho National Laboratory conducted testing and analysis of the Eaton smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from Eaton for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the Eaton smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionality testing, abnormal conditions testing, and charging of a plug-in vehicle.

  6. How the reverse supply chain impacts the financial performance of original equipment manufacturers

    DEFF Research Database (Denmark)

    Larsen, Samuel

    This thesis examines the financial impact of a firm’s reverse supply chain (RSC). Specifically, the thesis examines the two questions of how the RSC can contribute to the financial performance of the firm and which factors are decisive for the RSC’s financial contribution. The thesis focuses...... on original equipment manufacturers. The thesis results show that the RSC can contribute to the financial performance of the firm in more than 20 different ways, which the thesis defines as functions of the RSC. Examples of RSC-functions are 1) resale of recovered end-products to price-focused market segments...... in the firm’s primary markets, 2) resale to customers in new markets (in e.g. emerging economies), and 3) sale of used materials back the firm’s original material suppliers. The firm’ RSC can conduct several RSC-functions simultaneously and the financial benefits from operating these RSC-functions differ...

  7. Performance management in the internal supply chain of an industry of equipment for refrigeration

    Directory of Open Access Journals (Sweden)

    Emílio Della Bruna Junior

    2013-05-01

    Full Text Available Supply chains are complex, conflicting and uncertain management environments, where the best alternatives are usually not previously know, they need to be built based on the managers objectives. For this reason, its decision-makers have been looking for management tools that expand their understanding in order to identify which objectives best represent their values regarding the decision context. With this in mind, this paper aims to develop a Performance Evaluation Model for the operations of the internal supply chain of an organization of the refrigeration equipment sector. The study adopts a mixture of qualitative and quantitative approaches and applies them through a case study. The data collection was conducted through unstructured interviews with the decision-maker as well as specialists appointed by him and supplemented by documentary research. The applied intervention instrument is the Multricriteria Decision Aid – Constructivist (MCDA-C due to its capacity of expanding the knowledge in the decision-maker about the consequences of his decisions on the criteria that he deems critical to the success of the company. One of the results of this research was the identification of the objectives that, according to the decision-maker perception, should drive the alternative definition process, as well as their organization, ordinal and cardinal measurement and integration. In addition, it can be highlighted the current situation diagnosis and elaboration of improvement actions, where the implementation effects of the Lean Philosophy and an Advanced Planning System are evaluated. The main contributions made by the article resides in the proposal of solutions for fulfilling gaps identified within the Supply Chain Performance Evaluation area and in the application of the MCDA-C to a real case.

  8. Remote handling equipment for CANDU retubing

    International Nuclear Information System (INIS)

    Crawford, G.S.; Lowe, H.

    1993-01-01

    Numet Engineering Ltd. has designed and supplied remote handling equipment for Ontario Hydro's retubing operation of its CANDU reactors at the Bruce Nuclear Generating Station. This equipment consists of ''Retubing Tool Carriers'' an'' Worktables'' which operate remotely or manually at the reactor face. Together they function to transport tooling to and from the reactor face, to position and support tooling during retubing operations, and to deliver and retrieve fuel channels and channel components. This paper presents the fundamentals of the process and discusses the equipment supplied in terms of its design, manufacturing, components and controls, to meet the functional and quality requirements of Ontario Hydro's retubing process. (author)

  9. Accelerating the deployment of supply chain strategies through the adoption of standard operations reference model for supply chains producing capacity

    Energy Technology Data Exchange (ETDEWEB)

    Toews, A. [Project Plato Inc., Calgary, AB (Canada)

    2004-07-01

    This PowerPoint presentation provided information on how to build a procurement organization in the energy sector with reference to aligning supply chain management with corporate objectives to enhance response time in transactions with suppliers and customers. The paper examined the degree to which procurement functions are centralized versus decentralized and which combinations work best. It also examined how e-commerce can improve the efficiency and effectiveness of the procurement function and add value to an organization. The author emphasized the importance of a multi-functional team to create a successful sourcing strategy and develop strong purchasing capabilities within the organization. tabs., figs.

  10. Development of a Consensus Standard for School Equipment: NSF/NSSEA 380

    Science.gov (United States)

    Breitner, Ashlee

    2011-01-01

    For many years, the school supplies and equipment industry has investigated methods to ensure product safety and compliance across all its product categories. In early 2010, NSF International and the National School Supply and Equipment Association (NSSEA) came together to develop quality standards for products and equipment designed for use in…

  11. 46 CFR 197.314 - First aid and treatment equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false First aid and treatment equipment. 197.314 Section 197... HEALTH STANDARDS GENERAL PROVISIONS Commercial Diving Operations Equipment § 197.314 First aid and... consists of— (i) Basic first aid supplies; and (ii) Any additional supplies necessary to treat minor trauma...

  12. 47 CFR 76.1621 - Equipment compatibility offer.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment compatibility offer. 76.1621 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1621 Equipment compatibility offer. Cable system... offer to supply each subscriber with special equipment that will enable the simultaneous reception of...

  13. A methodology and supply chain management inspired reference ontology for modeling healthcare teams.

    Science.gov (United States)

    Kuziemsky, Craig E; Yazdi, Sara

    2011-01-01

    Numerous studies and strategic plans are advocating more team based healthcare delivery that is facilitated by information and communication technologies (ICTs). However before we can design ICTs to support teams we need a solid conceptual model of team processes and a methodology for using such a model in healthcare settings. This paper draws upon success in the supply chain management domain to develop a reference ontology of healthcare teams and a methodology for modeling teams to instantiate the ontology in specific settings. This research can help us understand how teams function and how we can design ICTs to support teams.

  14. Respiratory and protective equipment at a large nuclear facility

    International Nuclear Information System (INIS)

    Zippler, D.B.

    1975-12-01

    A variety of personal protective equipment is used in a large nuclear facility to protect employees against both nuclear and ordinary industrial materials. Equipment requirements are based on risk evaluation and may range from a minimum of shoe covers to whole body protection by air-supplied plastic suits. Types of equipment are listed and one-year costs are given. Criteria for evaluating and compartmentalizing risks are discussed. Air-supplied suits and hoods are discussed in detail

  15. CV equipment responsibilities

    CERN Document Server

    Pirollet, B

    2008-01-01

    This document describes the limits of the responsibilities of the TS/CV for fire fighting equipment at the LHC. The various interfaces, providers and users of the water supply systems and clean water raising systems are described.

  16. Portfolio Purchasing Decision for Mobile Power Equipment of B2C E-Commerce Export Retailer Based on CVaR

    Science.gov (United States)

    Yanchun, Wan; Qiucen, Chen

    2017-11-01

    Purchasing is an important part of export e-commerce of B2C, which plays an important role on risk and cost control in supply management. From the perspective of risk control, the paper construct a CVaR model for portfolio purchase. We select a heavy sales mobile power equipment from a typical B2C e-commerce export retailer as study sample. This study optimizes the purchasing strategy of this type of mobile power equipment. The research has some reference for similar enterprises in purchasing portfolio decision.

  17. Reference design of the power supply system for the resistive-wall-mode control in JT-60SA

    Energy Technology Data Exchange (ETDEWEB)

    Ferro, Alberto, E-mail: alberto.ferro@igi.cnr.it [Consorzio RFX, C.so Stati Uniti 4, 35127 Padova (Italy); Gaio, Elena [Consorzio RFX, C.so Stati Uniti 4, 35127 Padova (Italy); Novello, Luca [Fusion for Energy, Broader Development of Fusion Department, Boltzmannstr 2, 85748 Garching (Germany); Matsukawa, Makoto; Shimada, Katsuhiro; Kawamata, Yoichi; Takechi, Manabu [Japan Atomic Energy Agency, Naka Fusion Institute, 801-1 Mukoyama, Naka, Ibaraki 311-019 (Japan)

    2015-10-15

    Highlights: • In JT-60SA, a power supply system (RWM-PS) will feed 18 coils to control the RWMs. • One power amplifier per coil will follow an arbitrary real-time reference. • Very fast dynamics is required (current bandwidth: 3 kHz; latency: 50 μs). • The requirements of the RWM-PS are updated and design solutions discussed. • The reference design of the RWM-PS is based on H-bridges operated at 20 – 30 kHz. - Abstract: The mission of JT-60SA, the satellite Tokamak under construction in Naka (Japan), includes the attainment of steady-state high-beta plasmas. For this purpose, an active control system based on 18 in-vessel sector coils (SC) is foreseen to suppress the resistive wall modes (RWM). Each coil will be independently fed by a dedicated converter, rated for 300 A and 240 V, which has to produce the required current/voltage following in real time the reference provided by the JT-60SA MHD Controller. To minimize the current rating, these converters shall be sufficiently fast to avoid an excessive growth of the RWM. This requires a very high dynamic performance, largely beyond that of standard industrial applications. This paper firstly reports the latest results of the studies on the requirements of the RWM active control system. Then, the reference design of the power supply system is presented, including the ac/dc conversion stage, the fast converters and the control section. The advantages of the proposed scheme are discussed and the main electrical parameters are presented.

  18. 46 CFR 197.340 - Breathing gas supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Breathing gas supply. 197.340 Section 197.340 Shipping... GENERAL PROVISIONS Commercial Diving Operations Equipment § 197.340 Breathing gas supply. (a) A primary breathing gas supply for surface-supplied diving must be sufficient to support the following for the...

  19. 7 CFR 3015.172 - Federal share of real property, equipment, and supplies.

    Science.gov (United States)

    2010-01-01

    ... equipment. To calculate the Federal share of replacement equipment the following procedures shall be...: Determine the percentage of the replacement equipment's costs that was covered by the amount received for... the step 2 percentage. (4) Step 4: If an additional outlay for the replacement equipment was charged...

  20. Non-invasive system for monitoring of the manufacturing equipment

    Science.gov (United States)

    Mazăre, A. G.; Belu, N.; Ionescu, L. M.; Rachieru, N.; Misztal, A.

    2017-08-01

    The automotive industry is one of the most important industries in the world that concerns the economy and the world culture. High demand has resulted in increasing of the pressure on the production lines. In conclusion, it is required more careful in monitoring of the production equipment not only for maintenance but also for staff safety and to increase the quality of production. In this paper, we propose a solution for non-invasive monitoring of the industrial equipment operation by measuring the current consumption on energy supply lines. Thus, it is determined the utilization schedule of the equipment and operation mode. Based on these measurements, it’s built an activity report for that equipment, available to the quality management and maintenance team. The solution consists of the current measuring equipment, with self-harvesting capabilities and radio transceiver, and an embedded system which run a server. The current measuring equipment will transmit data about consumption of each energy supply network line where is placed the industrial equipment. So, we have an internal measuring radio network. The embedded system will collect data for the equipment and put in a local data base and it will provide via an intranet application. The entire system not requires any supplementary energy supply and interventions in the factory infrastructure. It is experimented in a company from the automotive industries.

  1. Purchasing Supplies, Equipment and Services Under EPA Grants

    Science.gov (United States)

    EPA developed this guidance to help ensure you meet EPA requirements when making such necessary purchases. With very few exceptions, you must follow a competitive process when you use EPA grant funds to acquire equipment and professional services.

  2. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  3. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  4. Chapter 5. Essential equipment, pharmaceuticals and supplies. Recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza epidemic or mass disaster

    NARCIS (Netherlands)

    Sprung, Charles L.; Kesecioglu, Jozef; Christian, Michael D.; Camargo, Ruben; Ceraso, Daniel; Azoulay, Elie; Duguet, Alexandre; Guery, Benoit; Reinhart, Konrad; Adini, Bruria; Barlavie, Yaron; Benin-Goren, Odeda; Cohen, Robert; Klein, Motti; Leoniv, Yuval; Margalit, Gila; Rubinovitch, Bina; Sonnenblick, Moshe; Steinberg, Avraham; Weissman, Charles; Wolff, Donna; de Jong, Menno; Moreno, Rui; An, Youzhong; Du, Bin; Joynt, Gavin M.; Colvin, John; Loo, Shi; Richards, Guy; Artigas, Antonio; Pugin, Jerome; Amundson, Dennis; Devereaux, Asha; Beigel, John; Danis, Marion; Farmer, Chris; Hick, John L.; Maki, Dennis; Masur, Henry; Rubinson, Lewis; Sandrock, Christian; Talmor, Daniel; Truog, Robert; Zimmerman, Janice; Brett, Steve; Montgomery, Hugh; Rhodes, Andrew; Sanderson, Frances; Taylor, Bruce

    2010-01-01

    To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on essential equipment, pharmaceuticals and supplies. Based on a literature review and expert opinion, a Delphi process was

  5. Results from the Operational Testing of the General Electric Smart Grid Capable Electric Vehicle Supply Equipment (EVSE)

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Richard Barney [Idaho National Lab. (INL), Idaho Falls, ID (United States); Scoffield, Don [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bennett, Brion [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-12-01

    The Idaho National Laboratory conducted testing and analysis of the General Electric (GE) smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from GE for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the GE smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionality testing, abnormal conditions testing, and charging of a plug-in vehicle.

  6. Supply-Chain Optimization Template

    Science.gov (United States)

    Quiett, William F.; Sealing, Scott L.

    2009-01-01

    The Supply-Chain Optimization Template (SCOT) is an instructional guide for identifying, evaluating, and optimizing (including re-engineering) aerospace- oriented supply chains. The SCOT was derived from the Supply Chain Council s Supply-Chain Operations Reference (SCC SCOR) Model, which is more generic and more oriented toward achieving a competitive advantage in business.

  7. 14 CFR 121.337 - Protective breathing equipment.

    Science.gov (United States)

    2010-01-01

    ... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.337... systems other than chemical oxygen generators, there must be a means to allow the crew to readily... fully charged. (iv) For each chemical oxygen generator, the supply system equipment must meet the...

  8. Temperature- and supply voltage-independent time references for wireless sensor networks

    CERN Document Server

    De Smedt, Valentijn; Dehaene, Wim

    2015-01-01

    This book investigates the possible circuit solutions to overcome the temperature- and supply voltage-sensitivity of fully-integrated time references for ultra-low-power communication in wireless sensor networks. The authors provide an elaborate theoretical introduction and literature study to enable full understanding of the design challenges and shortcomings of current oscillator implementations.  Furthermore, a closer look to the short-term as well as the long-term frequency stability of integrated oscillators is taken. Next, a design strategy is developed and applied to 5 different oscillator topologies and 1 sensor interface.All 6 implementations are subject to an elaborate study of frequency stability, phase noise, and power consumption. In the final chapter all blocks are compared to the state of the art. The main goals of this book are: • to provide a comprehensive overview of timing issues and solutions in wireless sensor networks; • to gain understanding of all underlying mechanisms by starti...

  9. 30 CFR 75.811 - High-voltage underground equipment; grounding.

    Science.gov (United States)

    2010-07-01

    ...-voltage equipment supplying power to such equipment receiving power from resistance grounded systems shall... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage underground equipment; grounding... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage...

  10. Orphee reactor experimental equipment

    International Nuclear Information System (INIS)

    1987-01-01

    Experimental equipment around the ORPHEE reactor is presented. The neutron source; and the spectrometers and sample environment (inelastic and quasi-elastic scattering, elastic scattering, spread scattering, small angle scattering) are described. An experiment proposal and reports guide is supplied [fr

  11. Improvements in electric power supply in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Minovskii, Yu.P.; Nabokov, Eh.P.; Savel' ev, G.P.

    1985-01-01

    Reviews measures taken by major coal producing countries to increase output levels. Discusses research carried out into advance design of equipment in FRG, UK, USA and France and proposes establishment of central automatic control of electric power supply system in Soviet mines, improvement in underground power supply equipment, increase in reliability, stabilization of standby capacity in low voltage circuits, maintenance-free electrical equipment, and efficient spare part storage in underground workings. States that introduction of the proposed system (details are given) will ensure that Soviet mines will eventually reach the development level of foreign mines. 2 refs.

  12. 46 CFR 197.312 - Breathing supply hoses.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Breathing supply hoses. 197.312 Section 197.312 Shipping... GENERAL PROVISIONS Commercial Diving Operations Equipment § 197.312 Breathing supply hoses. (a) Each breathing supply hose must— (1) Have a maximum working pressure that is equal to or exceeds— (i) The maximum...

  13. Evaluation of video capture equipment for secondary image acquisition in the PACS.

    Science.gov (United States)

    Sukenobu, Yoshiharu; Sasagaki, Michihiro; Hirabuki, Norio; Naito, Hiroaki; Narumi, Yoshifumi; Inamura, Kiyonari

    2002-01-01

    There are many cases in which picture archiving and communication systems (PACS) are built with old-type existing modalities with no DICOM output. One of the methods for interfacing them to the PACS is to implement video capture (/ frame grabber) equipment. This equipment takes analog video signal output from medical imaging modalities, and amplitude of the video signal is A/D converted and supplied to the PACS. In this report, we measured and evaluated the accuracy at which this video capture equipment could capture the image. From the physical evaluation, we found the pixel values of an original image and its captured image were almost equal in gray level from 20%-90%. The change in the pixel values of a captured image was +/-3 on average. The change of gray level concentration was acceptable and had an average standard deviation of around 0.63. As for resolution, the degradation was observed at the highest physical level. In a subjective evaluation, the evaluation value of the CT image had a grade of 2.81 on the average (the same quality for a reference image was set to a grade of 3.0). Abnormalities in heads, chests, and abdomens were judged not to influence diagnostic accuracy. Some small differences were seen when comparing captured and reference images, but they are recognized as having no influence on the diagnoses.

  14. 46 CFR 113.10-9 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply. 113.10-9 Section 113.10-9 Shipping COAST... SYSTEMS AND EQUIPMENT Fire and Smoke Detecting and Alarm Systems § 113.10-9 Power supply. (a) General... battery, the charger must be supplied from the final emergency power source. Upon loss of power to the...

  15. 46 CFR 113.43-5 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply. 113.43-5 Section 113.43-5 Shipping COAST... SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-5 Power supply. Each steering failure alarm system must be supplied by a circuit that: (a) Is independent of other steering gear system and steering...

  16. 21 CFR 866.4500 - Immunoelectrophoresis equipment.

    Science.gov (United States)

    2010-04-01

    ... (CONTINUED) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents... clinical use with its electrical power supply is a device used for separating protein molecules...

  17. Decision-Making for Supply Chain Integration Supply Chain Integration

    CERN Document Server

    Lettice, Fiona; Durowoju, Olatunde

    2012-01-01

    Effective supply chain integration, and the tight co-ordination it creates, is an essential pre-requisite for successful supply chain management.  Decision-Making for Supply Chain Integration is a practical reference on recent research in the area of supply chain integration focusing on distributed decision-making problems. Recent applications of various decision-making tools for integrating supply chains are covered including chapters focusing on: •Supplier selection, pricing strategy and inventory decisions in multi-level supply chains, •RFID-enabled distributed decision-making, •Operational risk issues and time-critical decision-making for sensitive logistics nodes, Modelling end to end processes to improve supply chain integration, and •Integrated systems to improve service delivery and optimize resource use. Decision-Making for Supply Chain Integration provides an insight into the tools and methodologies of this field with support from real-life case studies demonstrating successful application ...

  18. Policy design in closed-loop supply chains for the integrated management of component recycling and spare parts supply in the electronics industry

    Science.gov (United States)

    Schroeter, Marcus; Spengler, Thomas

    2004-02-01

    The strategy to recover components from discarded electrical and electronic equipment to obtain spare parts is promising, especially during the final service phase. In that phase, the original product is no longer produced and the sources of new parts are often limited. Controlling those closed-loop supply chains is challenging. Decision makers have to choose when to acquire discarded equipment, when to recover used parts, and when to produce new parts. We developed a generic system dynamics model that provides a test for various proposed policies to control closed-loop supply chains with parts recovery and spare-parts supply.

  19. Evaluating performance characteristics of x-ray equipment and film systems without the use of electronic measurement and/or special instruments

    International Nuclear Information System (INIS)

    Bianchi, M.F.; DeNitto, C.; Liscio, A.; Scala, N.

    2004-01-01

    Measurement and control of characteristics of NDT equipment and system that produce output to be interpreted by inspector is one of the most important tools for NDT reliability. Control activity should be based on: initial accurate measurement and calibration; periodical check to assure maintenance of calibration status; and, immediate verification and corrective action when any malfunctioning is suspected. 'Self-calibration' intended as capability of NDT facility to calibrate and control its own equipment and systems is very important for continuous and reliable activity. Typical approach based on this philosophy is ASTM E317 'Standard Practice for Evaluating Performance Characteristics of Ultrasonic Pulse-Echo Examination Instruments and Systems Without the Use of Electronic Measurement Instruments' that is applicable to shop or field conditions. Is 'Self-calibration' applicable to radiographic system too? Many characteristics can be self-determined according to existing practices and methods, but other ones require assistance and cooperation of supplier both for film system and x-ray equipment. A certified film system being controlled by pre-exposed filmstrips can be adopted as 'measurement device' for X-ray output concerning both intensity and contrast. Basically x-ray equipment manufacturer performs initial accurate measurement and calibration using electronic measurement and/or special instrumentation as necessary. Then specific film set on 'low-price' blocks and specimens is produced according to standard practice whose guidelines are supplied by this paper. Film set, blocks, specimens and results referred to specific film system will be the reference kit for periodical check in NDT facility. This paper supplies some guidelines for standard practice based on testing using mainly GE Inspection Technologies radiographic system being available in Avio facilities. (author)

  20. 33 CFR 157.170 - COW equipment: Removal.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false COW equipment: Removal. 157.170... Crude Oil Washing (COW) System on Tank Vessels Cow Operations § 157.170 COW equipment: Removal. (a) Whenever a deck mounted COW machine is removed from the tank, the master shall ensure that: (1) The supply...

  1. Optimal placement of switching equipment in reconfigurable distribution systems

    Directory of Open Access Journals (Sweden)

    Mijailović Vladica

    2011-01-01

    Full Text Available This paper presents a comparative analysis of some measures that can improve the reliability of medium-voltage (MV distribution feeder. Strictly speaking, the impact of certain types of switching equipment installed on the feeder and possibilities of backup supply from the adjacent feeders were analyzed. For each analyzed case, equations for the calculation of System Average Interruption Duration Index and energy not delivered to the customers are given. The effects of certain measures are calculated for one real MV-feeder for radial supply to customers and in cases of possible backup supply to the customers. Installation locations of certain types of switching equipment for the given concept of energy supply are determined according to the criterion of minimum value of System Average Interruption Duration Index and according to the criterion of minimum value of energy not delivered to the customers.

  2. 30 CFR 77.1707 - First aid equipment; location; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First aid equipment; location; minimum... OF UNDERGROUND COAL MINES Miscellaneous § 77.1707 First aid equipment; location; minimum requirements. (a) Each operator of a surface coal mine shall maintain a supply of the first aid equipment set forth...

  3. 46 CFR Sec. 12 - Disposition of removed equipment and scrap.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Disposition of removed equipment and scrap. Sec. 12... CONTRACT-NSA-LUMPSUMREP Sec. 12 Disposition of removed equipment and scrap. (a) Article 8 of the NSA-LUMPSUMREP Contract provides that any ship equipment, fuel, lube oil, supplies, stores, furniture, fixtures...

  4. An 11-bit 200 MS/s subrange SAR ADC with low-cost integrated reference buffer

    Science.gov (United States)

    He, Xiuju; Gu, Xian; Li, Weitao; Jiang, Hanjun; Li, Fule; Wang, Zhihua

    2017-10-01

    This paper presents an 11-bit 200 MS/s subrange SAR ADC with an integrated reference buffer in 65 nm CMOS. The proposed ADC employs a 3.5-bit flash ADC for coarse conversion, and a compact timing scheme at the flash/SAR boundary to speed up the conversion. The flash decision is used to control charge compensating for the reference voltage to reduce its input-dependent fluctuation. Measurement results show that the fabricated ADC has achieved significant improvement by applying the reference charge compensation. In addition, the ADC achieves a maximum signal-to-noise-and-distortion ratio of 59.3 dB at 200 MS/s. It consumes 3.91 mW from a 1.2 V supply, including the reference buffer. Project supported by the Zhongxing Telecommunication Equipment Corporation and Beijing Microelectronics Technology Institute.

  5. Remotely operated replaceable process equipment

    International Nuclear Information System (INIS)

    Westendorf, H.

    1987-01-01

    The coupling process of pneumatic and electrical auxiliary lines of a pneumatic control pressure line in a large cell of the reprocessing plant is carried out, together with the coupling process of the connecting flange of the process equipment. The coupling places of the auxiliary lines, such as control or supply lines, are laid in the flange parts of the flanges to be connected. The pipe flange on the frame side remains flush with the connecting flange of the process equipment. (DG) [de

  6. Comprehensive analysis and evaluation of big data for main transformer equipment based on PCA and Apriority

    Science.gov (United States)

    Guo, Lijuan; Yan, Haijun; Hao, Yongqi; Chen, Yun

    2018-01-01

    With the power supply level of urban power grid toward high reliability development, it is necessary to adopt appropriate methods for comprehensive evaluation of existing equipment. Considering the wide and multi-dimensional power system data, the method of large data mining is used to explore the potential law and value of power system equipment. Based on the monitoring data of main transformer and the records of defects and faults, this paper integrates the data of power grid equipment environment. Apriori is used as an association identification algorithm to extract the frequent correlation factors of the main transformer, and the potential dependence of the big data is analyzed by the support and confidence. Then, the integrated data is analyzed by PCA, and the integrated quantitative scoring model is constructed. It is proved to be effective by using the test set to validate the evaluation algorithm and scheme. This paper provides a new idea for data fusion of smart grid, and provides a reference for further evaluation of big data of power grid equipment.

  7. 29 CFR 1926.951 - Tools and protective equipment.

    Science.gov (United States)

    2010-07-01

    ... falling objects, electric shock, or burns. (b) Personal climbing equipment. (1) Body belts with straps or...) Be equipped with three-wire cord having the ground wire permanently connected to the tool frame and... “Double Insulated”; or (iii) Be connected to the power supply by means of an isolating transformer, or...

  8. Instrumentation qualification. Seismic qualification of C-E instrumentation equipment. Part One

    International Nuclear Information System (INIS)

    1977-05-01

    A summary of the C-E seismic qualification program utilized to demonstrate the seismic design adequacy of the instrumentation and control equipment used in C-E supplied Nuclear Steam Supply Systems (NSSS) is presented. The report is divided into two parts. Part One includes the equipment seismic requirements and a description of the qualification methods. Part Two lists the specific equipment by nuclear station in which it is used and the equipment test results are summarized in a standard data sheet format to facilitate review. The seismic requirements are based on individual contract commitments with C-E customers and the NRC Standard Review Plan, Section 3.10 ''Seismic Qualification of Category I Instrumentation and Electrical Equipment.'' Equipment is qualified for use in a seismic environment where damage potential to the equipment is less than or equal to that simulated seismic environment to which it has been qualified. The anticipated Safe Shutdown Earthquake (SSE) environment at the inservice location of equipment should be confirmed by each applicant as not exceeding that to which it is qualified

  9. STATE OF WATER SUPPLY INFRASTRUCTURE IN THE SUBCARPATHIAN CITIES

    Directory of Open Access Journals (Sweden)

    Katarzyna PIETRUCHA-URBANIK

    Full Text Available The characteristics of equipping the Subcarpathian province cities with water supply infrastructure was made on the basis of data collected from the Provincial Office, Statistical Office, reports submitted by water companies regarding the functioning of water supply infrastructure and literature data. The indicators characterizing water supply infrastructure were determined for the years 1995-2014. In the paper the indicators of equipping cities with water supply systems were presented. Also water consumption and changes in the length of the water supply network in the cities of the Subcarpathian Province were examined. The analysis shows that the water consumption for the years 1995-2014 decreased by almost 6 m3∙year-1 per capita. The reason for such situation was the increasing price of water and the ecological awareness of the inhabitants of the Subcarpathian region. In the last year of the analysis the water supply system in urban areas of the Subcarpathian province was used by 95% of the population and, for comparison, in rural areas by 77% of the population. In the paper also changes in prices for water in the Subcarpathian region were shown, on the basis of data from the water tariffs in individual water companies. The important element of urban development is the technical infrastructure which reduces the investment costs. The determined indicators of equipping cities with water supply systems show an upward trend in the development of technical infrastructure. Based on the operational data from the water companies the failure rates in selected water supply networks were determined.

  10. 7 CFR 550.40 - Supplies and other expendable property.

    Science.gov (United States)

    2010-01-01

    ... is a residual inventory of unused supplies exceeding $5,000 in total aggregate value upon termination... 7 Agriculture 6 2010-01-01 2010-01-01 false Supplies and other expendable property. 550.40 Section... Management of Agreements Equipment/property Standards § 550.40 Supplies and other expendable property. (a...

  11. 46 CFR 113.25-6 - Power supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply. 113.25-6 Section 113.25-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-6 Power supply. The emergency power source...

  12. 22 CFR 226.35 - Supplies and other expendable equipment.

    Science.gov (United States)

    2010-04-01

    ... Section 226.35 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Property Standards § 226.35 Supplies...-Federal outside organizations for a fee that is less than private companies charge for equivalent services...

  13. Geothermal heat-pump systems of heat supply

    International Nuclear Information System (INIS)

    Vasil'ev, G.P.

    2004-01-01

    The data on the multilayer operation of the objects, located in the climatic conditions of the central area of Russia and equipped with the geothermal heat-pumping systems of the heat supply are presented. The results of the analytical studies on evaluating the geothermal heat-pumping systems of the heat supply integration efficiency into the structure of the energy supply system, prevailing in the country, are presented [ru

  14. Analysis of Supply Chain Risk Management Strategies: Case Study of Supply Chain Disruptions

    OpenAIRE

    Marcelo Dias Carvalho; Leticia Ishikawa

    2016-01-01

    Supply Chain Risk Management refers to a set of strategies used by companies to avoid supply chain disruption caused by damage at production facilities, natural disasters, capacity issues, inventory problems, incorrect forecasts, and delays. Many companies use the techniques of the Toyota Production System, which in a way goes against a better management of supply chain risks. This paper studies key events in some multinationals to analyze the trade-off between the best supply chain risk mana...

  15. Equipment for x- and gamma ray radiography

    International Nuclear Information System (INIS)

    Abd Nasir Ibrahim; Azali Muhammad; Ab Razak Hamzah; Abd Aziz Mohamed; Mohammad Pauzi Ismail

    2004-01-01

    The following topics related to the equipment for x - and gamma ray radiography are discussed in this chapter. The topics are x-ray source for Industrial Radiography: properties of x-ray, generation of x-ray, mechanism of x-ray production, x-ray equipment, power supply, distribution of x-ray intensity along the tube: gamma ray source for Industrial Radiography: properties of gamma rays, gamma ray sources, gamma ray projectors on cameras, source changing. Care of Radiographic Equipments: Merits and Demerits of x and Gamma Rays

  16. Controlled power supply for isotopes separator; Alimentations regulees pour separateur d'isotopes

    Energy Technology Data Exchange (ETDEWEB)

    Lavaitte, A; Pottier, J [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1953-07-01

    This equipment is destined to equip the separator of isotopes who is the subject of the CEA report n 138. It includes: - a controlled power supply in voltage. - a controlled power supply in current. The spectra of fluctuations of these assembly is different in the two cases. (authors) [French] Cet equipement est destine a equiper le separateur d'isotopes qui fait l'objet du rapport C.E.A. n 138. Il comprend: - une alimentation regulee en tension. - une alimentation regulee en courant. Le spectre de fluctuations de ces ensembles est different dans les deux cas. (auteurs)

  17. Estimating Supplies Program (ESP), Version 1.00, User's Guide

    National Research Council Canada - National Science Library

    Tropeano, Anne

    2000-01-01

    The Estimating Supplies Program (ESP) is an easy to use Windows(TM)-based software program for military medical providers, planners, and trainers that calculates the amount of supplies and equipment required to treat a patient stream...

  18. Design considerations for high current regulated DC power supplies with reference to 600 kW variable DC power supply

    International Nuclear Information System (INIS)

    Ushakumari; Garud, A.N.; Nadkarni, S.S.

    1980-01-01

    High current regulated dc power supplies find increasing applications in industry and research. The power rating of these supplies vary from few killowatts to megawatts. The general requirements of these supplies for various applications and the techniques used to achieve the desired performance are presented. The design and selection of various circuit blocks namely the rectifier transformer, multiphase rectifier arrangement, SCR paralleling and current sensing techniques, are discussed in detail for a 600 killowatt current controlled supply developed in the Bhabha Atomic Research Centre, Bombay, and used for the thermal studies of reactor components. The power supply incorporates paralleled phase controlled thyristors with a closed loop feedback circuitary to achieve a current stability of 0.1% and smooth output variation from 10 to 100%. (auth.)

  19. FEATURES OF SCIENTIFIC INVESTIGATIONS CONDUCTED IN THE LABORATORIES OF THE DEPARTMENT OF WATER SUPPLY OF MGSU

    OpenAIRE

    Nikitina Irina Nikolaevna; Eremeev Aleksandr Vladimirovich

    2016-01-01

    The article focuses on the work of the laboratories of the Department of Water Supply of MGSU. The laboratory of pipe-lines, pumping equipment and sanitary equipment operates in MGSU affiliated to the department of water supply. A hydraulic stand for testing and defining the the hydraulic characteristics of pressure and free-flow pipelines of water supply and sewerage systems is installed there. There are also stands for investigating the sanitary equipment of the buildings, the fire and hot ...

  20. Toward an Understanding of Reference-Dependent Labor Supply

    DEFF Research Database (Denmark)

    Andersen, Steffen; Brandon, Alec; Gneezy, Uri

    Perhaps the most powerful form of framing arises through reference dependence, wherein choices are made recognizing the starting point or a goal. In labor economics, for example, a form of reference dependence, income targeting, has been argued to represent a serious challenge to traditional...

  1. 46 CFR 76.25-15 - Pumps and water supply.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Pumps and water supply. 76.25-15 Section 76.25-15... EQUIPMENT Automatic Sprinkling System, Details § 76.25-15 Pumps and water supply. (a) An automatically controlled pump shall be provided to supply the sprinkling system and shall be used for no other purpose. The...

  2. 30 CFR 75.1713-7 - First-aid equipment; location; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First-aid equipment; location; minimum... § 75.1713-7 First-aid equipment; location; minimum requirements. (a) Each operator of an underground coal mine shall maintain a supply of the first-aid equipment set forth in paragraph (b) of this § 75...

  3. File structure and organization in the automation system for operative account of equipment and materials in JINR

    International Nuclear Information System (INIS)

    Gulyaeva, N.D.; Markova, N.F.; Nikitina, V.I.; Tentyukova, G.N.

    1975-01-01

    The structure and organization of files in the information bank for the first variant of a JINR material and technical supply subsystem are described. Automated system of equipment operative stock-taking on the base of the SDS-6200 computer is developed. Information is stored on magnetic discs. The arrangement of each file depends on its purpose and structure of data. Access to the files can be arbitrary or consecutive. The files are divided into groups: primary document files, long-term reference, information on items that may change as a result of administrative decision [ru

  4. Vehicle to Electric Vehicle Supply Equipment Smart Grid Communications Interface Research and Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Kevin Morrow; Dimitri Hochard; Jeff Wishart

    2011-09-01

    Plug-in electric vehicles (PEVs), including battery electric, plug-in hybrid electric, and extended range electric vehicles, are under evaluation by the U.S. Department of Energy's Advanced Vehicle Testing Activity (AVTA) and other various stakeholders to better understand their capability and potential petroleum reduction benefits. PEVs could allow users to significantly improve fuel economy over a standard hybrid electric vehicles, and in some cases, depending on daily driving requirements and vehicle design, PEVs may have the ability to eliminate petroleum consumption entirely for daily vehicle trips. The AVTA is working jointly with the Society of Automotive Engineers (SAE) to assist in the further development of standards necessary for the advancement of PEVs. This report analyzes different methods and available hardware for advanced communications between the electric vehicle supply equipment (EVSE) and the PEV; particularly Power Line Devices and their physical layer. Results of this study are not conclusive, but add to the collective knowledge base in this area to help define further testing that will be necessary for the development of the final recommended SAE communications standard. The Idaho National Laboratory and the Electric Transportation Applications conduct the AVTA for the United States Department of Energy's Vehicle Technologies Program.

  5. Efficient power supply using Power over Ethernet; Effiziente Stromversorgung mittels Power over Ethernet (PoE)

    Energy Technology Data Exchange (ETDEWEB)

    Huser, A.

    2005-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at methods of supplying small equipment such as Internet telephones, web cams, hubs, hard discs, audio equipment, point-of-sale terminals, game consoles etc. with power via their Ethernet connections. A short comparison is presented between Power over Ethernet (PoE) and other methods of supplying power along with data, including Universal Serial Bus (USB), FireWire and Powerline systems. The advantages of PoE over the use of separate power supply units are discussed and recommendations are made to the manufacturers and users of small peripheral equipment regarding the dimensioning and loading of such power supply systems.

  6. Generation Adequacy Report on the electricity supply-demand balance in France - 2017 Edition. Reference document

    International Nuclear Information System (INIS)

    2018-01-01

    In accordance with French legislation, each year RTE drafts and publishes the 'Generation Adequacy Report' concerning the supply demand balance of electricity. As a diagnostic reference for security of supply and of the electric network, the report is a key corporate exercise which is used to shed light on the medium to long term forecasts for security of supply, and therefore to develop national energy policies. This 2017 report presents: 1 - the power consumption and its perspectives according to the correct implementation of energy efficiency actions; 2 - the power generation park with scenarios integrating a public control and a modeling of the economic decisions of competing actors; 3 - A realistic European power trade vision integrating energy policy uncertainties of neighboring countries; 4 - The five next year analysis: a tight balance with necessary choices; 5 - the 'Ohm' scenario: an unprecedented adaptation of the production park to meet the nuclear share law goal; 6 - The 'Ampere' scenario for a reduction of nuclear production following the rhythm of renewable energy sources development; 7 - The 'Hertz' scenario with a development of thermal means to accelerate the nuclear phasing out without CO 2 emissions increase; 8 - The 'Volt' scenario for a sustained development of renewable energy sources together with an evolution of the nuclear park adapted to the European economic opportunities; 9 - The 'Watt' scenario for an automatic decommissioning of reactors after 40 years of operation; 10 - Self-consumption development and the transformation of the power system under the effect of investment decision decentralization; 11 - Cross-analysis of scenarios: the 2030-2035 power system has to be decided today

  7. System for routine testing of self-contained and airline breathing equipment

    Energy Technology Data Exchange (ETDEWEB)

    McDermott, H.J.; Hermens, G.A.

    1980-07-01

    A system for routine testing of self-contained and airline breathing equipment, developed by Shell Oil Co., for testing breathing equipment at one of its refineries, consists of an 80 psig air supply for airline respirators; a 500-2100 psig air supply for self-contained units; a regulator test system which uses a mannequin head that simulates human inhalation and which tests the ability of the regulator to keep the mask interior at the correct positive pressure; and an exhalation valve test system which identifies a leaky or sticking valve. The testing system has been in use for about 30 mo and has led to increased acceptance of respiratory protective equipment by workers.

  8. An Empirical Competence-Capability Model of Supply Chain Innovation

    OpenAIRE

    Mandal, Santanu

    2016-01-01

    Supply chain innovation has become the new pre-requisite for the survival of firms in developing capabilities and strategies for sustaining their operations and performance in the market. This study investigates the influence of supply and demand competence on supply chain innovation and its influence on a firm’s operational and relational performance. While the former competence refers to production and supply management related activities, the latter refers to distribution and demand manage...

  9. Production planning and control of closed-loop supply chains

    NARCIS (Netherlands)

    K. Inderfurth (Karl); R.H. Teunter (Ruud)

    2001-01-01

    textabstractMore and more supply chains emerge that include a return flow of materials. Many original equipment manufacturers are nowadays engaged in the remanufacturing business. In many process industries, production defectives and by-products are reworked. These closed-loop supply chains deserve

  10. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  11. Prophylactic and thermovision measurements of electric machines and equipment

    International Nuclear Information System (INIS)

    Jedlicka, R.; Brestovansky, L.

    1996-01-01

    High-voltage measurements of generators, unit and service transformers and some significant motor drives used at a nuclear power plant are described in this paper. Thermovision measurements of electric machines and distribution systems are dealt with in the second part of the paper. Power electric equipment represent one of the most significant components of a nuclear power plant. Turbine mechanical energy is converted into the electrical energy within these equipment. Power generated by generators is transformed by transformers so that it can achieve appropriate parameters for both the transmission over the distribution system and the power plant service power supply. The service power supply switchboards and cables provide supply to motors and other consumers necessary for the nuclear power plant technological process. The whole complex of equipment has to be maintained in good technical conditions. It is necessary to make thermovision and prophylactic measurements to identify and verify the electric equipment technical condition. The mentioned measurements warn the operation staff in advance against both gradual deterioration of power connection contact resistances, i.e. power connections overheating, and the machine insulation systems condition deterioration. The operation staff try to prevent the electric equipment operation accidents by early removing the detected failures, thus, improving the nuclear safety. In order to provide the above-mentioned activities a special prophylactic measurement group was established at the NPP Bohunice in 1983. The group specialists make following types of measurements. 1. Prophylactic measurements of electric machines. Prophylactics of 220 MW generators and 6 MW service power generators; Prophylactics of both unit and service transformers and VHV bushings; Prophylactics of major 6 kV motor drives. 2. Thermovision measurements of current connections. Measurements enumarated in paragraph 1 are made on disconnected electric

  12. Ninth international conference on metering and tariffs for energy supply. Proceedings

    International Nuclear Information System (INIS)

    1999-01-01

    Contributions to the ninth international conference on Metering and Tariffs for Energy Supply are presented. Topics reviewed include legal metrology, regulation and the commercial framework (3 papers); metering in a competitive supply (7 papers); interactive papers (13 papers); standardisation (5 papers); equipment design (5 papers); equipment manufacture and testing (5 papers); data collection and processing (6 papers); securing and enhancing revenue (5 papers); prepayment systems (5 papers); and metering as a business (4 papers). (UK)

  13. FEATURES OF SCIENTIFIC INVESTIGATIONS CONDUCTED IN THE LABORATORIES OF THE DEPARTMENT OF WATER SUPPLY OF MGSU

    Directory of Open Access Journals (Sweden)

    Nikitina Irina Nikolaevna

    2016-03-01

    Full Text Available The article focuses on the work of the laboratories of the Department of Water Supply of MGSU. The laboratory of pipe-lines, pumping equipment and sanitary equipment operates in MGSU affiliated to the department of water supply. A hydraulic stand for testing and defining the the hydraulic characteristics of pressure and free-flow pipelines of water supply and sewerage systems is installed there. There are also stands for investigating the sanitary equipment of the buildings, the fire and hot water supply systems. The main research directions of the department of water supply are diverse: hydraulics of water supply systems, recon-struction of pipelines using trenchless technologies, reliable water supply and distribution systems, purification of natural water for drinking and industrial water supply, post-treatment of natural water for domestic water supply, resource conservation in domes-tic water supply systems, etc. The laboratory also has a computer lab, able to simultane-ously hold up to 30 students. In collaboration with the laboratory there operates a scien-tific circle for students and Master students, which provides a lot of interesting and useful information on the latest developments.

  14. An RFID middleware for supply chain management

    Directory of Open Access Journals (Sweden)

    Artur Pinto Carneiro

    2011-12-01

    Full Text Available RFID (Radio Frequency Identification systems for identification and tracking of products and equipments have been progressively adopted as an essential tool for supply chain management, a production environment where the members usually share with each other their own logistic and management systems. Therefore, the development of supply chain RFID systems can be strongly simplified through the inclusion of an intermediate software layer – the middleware – responsible for the creation of interfaces to integrate all the heterogeneous software components. In this article we present a case study developed at IPT (Instituto de Pesquisas Tecnológicas do Estado de São Paulo which gave rise to a middleware prototype able to implement the required software integration on the supply chain of an electric power distribution company. The developed middleware is used to manage the interactions with a heterogeneous group of mobile devices  cell phones, handhelds and data colectors,  operated by different supply chain agents that grab data associated to various processes executed by a given electric power distribution equipment during its life cycle and transfer those data to a central database in order to share them with all the logistic and management corporation systems.

  15. Prophylactic and thermovision measurements of electric machines and equipment

    Energy Technology Data Exchange (ETDEWEB)

    Jedlicka, R; Brestovansky, L [Atomova Elektraren Bohunice, Jaslovske Bohunice (Slovakia)

    1997-12-31

    High-voltage measurements of generators, unit and service transformers and some significant motor drives used at a nuclear power plant are described in this paper. Thermovision measurements of electric machines and distribution systems are dealt with in the second part of the paper. Power electric equipment represent one of the most significant components of a nuclear power plant. Turbine mechanical energy is converted into the electrical energy within these equipment. Power generated by generators is transformed by transformers so that it can achieve appropriate parameters for both the transmission over the distribution system and the power plant service power supply. The service power supply switchboards and cables provide supply to motors and other consumers necessary for the nuclear power plant technological process. The whole complex of equipment has to be maintained in good technical conditions. It is necessary to make thermovision and prophylactic measurements to identify and verify the electric equipment technical condition. The mentioned measurements warn the operation staff in advance against both gradual deterioration of power connection contact resistances, i.e. power connections overheating, and the machine insulation systems condition deterioration. The operation staff try to prevent the electric equipment operation accidents by early removing the detected failures, thus, improving the nuclear safety. In order to provide the above-mentioned activities a special prophylactic measurement group was established at the NPP Bohunice in 1983. The group specialists make following types of measurements. 1. Prophylactic measurements of electric machines. Prophylactics of 220 MW generators and 6 MW service power generators; Prophylactics of both unit and service transformers and VHV bushings; Prophylactics of major 6 kV motor drives. 2. Thermovision measurements of current connections. (Abstract Truncated)

  16. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  17. 18 CFR 367.3930 - Account 393, Stores equipment.

    Science.gov (United States)

    2010-04-01

    ... ACT Service Company Property Chart of Accounts § 367.3930 Account 393, Stores equipment. (a) This... materials and supplies. (b) This account must include the following items: (1) Chain falls. (2) Counters. (3...

  18. Remote handling equipment design for the HEDL fuel supply program

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1984-09-01

    A process line is currently being developed for fabrication of high exposure mixed uranium-plutonium core assemblies. This paper describes the design philosophy, process flow, equipment, and the handling and radiation shielding techniques used for inspection of Fast Flux Test Facility (FFTF) fuel pins and assembly of Driver Fuel Assemblies (DFAs) 6 figures

  19. Development of DC active filter for high magnetic field stable power supply

    International Nuclear Information System (INIS)

    Wang Lei; Liu Xiaoning

    2008-01-01

    The DC active filter (DAF), with very low current ripple, of the stable power supply system of high magnetic field device is developed by using the PWM and parallel active power filter technique. Due to the PWM control technique, the required DAF current can be obtained and the current ripple can be compensated by means of monitoring the load voltage, and the current ripple becomes very low by adjusting the load voltage. The simulation and analysis show that this system can respond to the reference quickly and is effective in suppressing the harmonics, especially the low-order harmonics. The feasibility of the proposed scheme is proved on the equipment built in the laboratory. (authors)

  20. Apollo experience report: Development flight instrumentation. [telemetry equipment for space flight test program

    Science.gov (United States)

    Farmer, N. B.

    1974-01-01

    Development flight instrumentation was delivered for 25 Apollo vehicles as Government-furnished equipment. The problems and philosophies of an activity that was concerned with supplying telemetry equipment to a space-flight test program are discussed. Equipment delivery dates, system-design details, and flight-performance information for each mission also are included.

  1. Type T reference function suitability for low temperature applications

    Science.gov (United States)

    Dowell, D.

    2013-09-01

    Type T thermocouples are commonly used in industrial measurement applications due to their accuracy relative to other thermocouple types, low cost, and the ready availability of measurement equipment. Type T thermocouples are very effective when used in differential measurements, as there is no cold junction compensation necessary for the connections to the measurement equipment. Type T's published accuracy specifications result in its frequent use in low temperature applications. An examination of over 328 samples from a number of manufacturers has been completed for this investigation. Samples were compared to a Standard Platinum Resistance Thermometer (SPRT) at the LN2 boiling point along with four other standardized measurement points using a characterized ice point reference, low-thermal EMF scanner and an 8.5 digit multimeter, and the data compiled and analyzed. The test points were approximately -196 °C, -75 °C, 0 °C, +100 °C, and +200 °C. These data show an anomaly in the conformance to the reference functions where the reference functions meet at 0 °C. Additionally, in the temperature region between -100 °C to -200 °C, a positive offset of up to 5.4 °C exists between the reference function equations published in the ASTM E230-06 for the nitrogen point and the measured response of the actual wire. This paper will examine the historical and technological reasons for this anomaly in the both the ASTM and IEC reference functions. At the request of the author and the Proceedings Editor the above article has been replaced with a corrected version. The original PDF file supplied to AIP Publishing contained several figures with missing information/characters—caused by processes used to generate the PDF file. All figures were affected by this error. The article has been replaced and these figures now display correctly. The corrected article was published on 7 November 2013.

  2. Soviet equipment flies in

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    End of February 1977 a Soviet Ilyushin-76 heavy freight aircraft landed at Cointrin airport having on board fifty large wire proprtional chambers and associated apparatus, together weighing 10 tons, supplied by the Joint Institute for Nuclear Research, Dubna, USSR. The equipment was for the CERN- Dubna-Munich-Saclay experiment NA4 on deep inelastic muon scattering being set up in the North Area of SPS. See Weekly Bulletin 11/78.

  3. Radioactive certified reference materials

    International Nuclear Information System (INIS)

    Watanabe, Kazuo

    2010-01-01

    Outline of radioactive certified reference materials (CRM) for the analysis of nuclear materials and radioactive nuclides were described. The nuclear fuel CRMs are supplied by the three institutes: NBL in the US, CETAMA in France and IRMM in Belgium. For the RI CRMs, the Japan Radioisotope Association is engaged in activities concerning supply. The natural-matrix CRMs for the analysis of trace levels of radio-nuclides are prepared and supplied by NIST in the US and the IAEA. (author)

  4. 14 CFR 25.1445 - Equipment standards for the oxygen distributing system.

    Science.gov (United States)

    2010-01-01

    ... distributing system. 25.1445 Section 25.1445 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Miscellaneous Equipment § 25.1445 Equipment standards for the oxygen distributing system. (a) When oxygen is supplied to both crew and passengers, the distribution system must be designed for either— (1) A source of...

  5. 49 CFR 583.11 - Allied suppliers of passenger motor vehicle equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Allied suppliers of passenger motor vehicle... CONTENT LABELING § 583.11 Allied suppliers of passenger motor vehicle equipment. (a) For each unique type of passenger motor vehicle equipment which an allied supplier supplies to the manufacturer with which...

  6. Energy efficiency criteria in uninterruptible power supply selection

    International Nuclear Information System (INIS)

    Moreno-Munoz, A.; Rosa, Juan Jose Gonzalez de la; Flores-Arias, J.M.; Bellido-Outerino, F.J.; Gil-de-Castro, A.

    2011-01-01

    With the generalized use of microelectronic devices, server computers and other susceptible equipment, the subject related to power quality (PQ) and its relationship to vulnerability of high performance plants are becoming an increasing concern to the industry. This paper addresses how uninterruptible power supply (UPS), particularly when configured in distributed DC mode, can become an energy efficient (EE) solution in high-tech buildings, especially when integrated with complimentary PQ measures. The paper is based on PQ audits conducted at different high-tech industries over the last years. It was found that the main problems for the equipment installed were voltage sags (or dips). Among all categories of electrical disturbances, voltage sags and momentary interruptions are the nemeses of the automated industrial process. The paper analyzes the capabilities of modern electronic power supplies and the convenience of embedded solution. Finally it is addresses the role of the Standards on the protection of electronic equipment and the implications for the final costumer.

  7. Development of Supervisory Control and Data Acquisition (SCADA) Electrical Supply in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Zainudin Jaafar; Mohd Ashhar Khalid; Mohd Hanafiah Chik

    2015-01-01

    Nuclear Power supplies in Malaysia supplied from the power utility company Tenaga Nasional Berhad through several substations before reaching the building and equipment. The power supply is received and passed down through the 11000 V high voltage switch gears to 415 V 3-phase or 1-phase 240 V. The equipment used in this process is dangerous and monitoring hardware operating remotely (remote) is the best as only guard machinery may engage in business operations. Similarly, the supply of electrical parameters should be monitored to ensure safe and continuous supply of and according to the appropriate voltage for record and analysis when needed. This paper discusses the monitoring and data acquisition is performed using the system 'Supervisory Control And Data Acquisition (SCADA) was developed. (author)

  8. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1990-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  9. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1987-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  10. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1988-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  11. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Tanaskovic, M.

    1995-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  12. Round table on the Supply Chain for NPPs construction: Localization - Daya Bay Experience; REEL Handling and Lifting Systems, More than 60 years expertise in lifting and handling equipment in production process

    International Nuclear Information System (INIS)

    Frantz, Philippe; Lachaise, Marc; Lau, Steven

    2014-01-01

    The second day afternoon began with the round table on the Supply Chain for NPPs construction with Philippe Frantz, President of REEL, Marc Lachaise, Head of procurement of NNB at EDF Energy, and Steven Lau, First Deputy General Manager of DNMC. Philippe Frantz started to present the activities and the contribution of REEL in the construction of NPPs as a main supplier of handling system. Then, Marc Lachaise took the lead to present Hinkley Point C Project, the Values of NNB and the key role of the supply chain in this Project. Steven Lau went on to describe the link of the supply chain with the operating of NPPs and explained the cooperation between EDF and CGNPC in order to secure the supply of equipment. Following their presentation, they started the open discussion with the audience by explaining their strategy to make or to buy and the link of this strategy to their core business. They also highlighted the new relations and the new partnership between supplier and customer. They insisted on the necessity to invest on supply chain and to have a strong Nuclear Safety Culture in the supply chain

  13. 41 CFR 101-26.507 - Security equipment.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Security equipment. 101-26.507 Section 101-26.507 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  14. Integration of transport and handling equipment at CERN criteria to satisfy operational needs and safety aspects

    CERN Document Server

    Bertone, C; CERN. Geneva. TS Department

    2004-01-01

    Within the last 4 years TS-IC-HM (former ST-HM group) integrated about 150 transport and handling supplies including 29 cranes, 20 fork lift trucks, 60 tunnel vehicles. Most of these are standardised supplies, but very often special functionality has been implemented and the complexity of the equipment has been increased. With the Rocla cryo-dipol transporters even prototype equipment was integrated that had been specially designed for CERN. This paper discusses the differences regarding the actions that have to be performed when the different kind of equipment have to be integrated.

  15. Design for the power-supply controller base on embedded operating system

    International Nuclear Information System (INIS)

    Guo Yuhui; Chinese Academy of Sciences, Beijing; Wang Yanyu; Qiao Weimin; Huang Jijiang; Lin Feiyu

    2008-01-01

    In order to realize the power-supply equipment long-distance monitor, adopts embedded RTOS (NutOS) and the TCP/1P protocol power-supply controller. Independently designs partially the software and hardware, through socket programming system long-distance control is realized. (authors)

  16. High-voltage power supply of ND6 portable dose rate meter

    International Nuclear Information System (INIS)

    Wang Shaling

    2001-01-01

    Portable dose rate meter needs to be equipped with a set of high-voltage power supply which is supplied by batteries and has characteristic of high quality, low energy expense and small size. The author introduces application conditions and performance guide line

  17. Specific features of auxiliary water supply at underground NPPs

    International Nuclear Information System (INIS)

    Pergamenshchik, B.K.; Pavlov, A.S.

    1991-01-01

    Specific features of auxiliary water supply systems for underground NPPs related to peculiarities of NPP basis equipment arrangement, are considered. Circulation water supply scheme, in which water cooling storage basin (cooling towers) with operational area corresponding to NPP power is on the surface and has traditional design, is proposed. Sufficiently high efficiency of the arrangement proposed is proved

  18. Inspector training for VIFM equipment - An integrated approach

    International Nuclear Information System (INIS)

    Truong, Q.S. Bob; Keeffe, R.; Ellacott, T.; Desson, K.; Herber, N.

    2001-01-01

    -in-time reference materials. Before and during the workshop, each participant is supplied with printed and CD-ROM-based quick-reference materials. These include concise procedure checklists and reference manuals in electronic format. The multimedia training programs were specifically designed with a 'reference mode' to facilitate access to 'refreshers' on specific topics. Inspector training is a key element in the effectiveness of the IAEA inspection program. Providing inspectors with a large amount of training and reference materials is only part of the solution. Inspectors must be given sufficient time and opportunities to use the materials effectively, and the training and reference materials must be designed from the outset to work as an integrated whole. The integrated, multi-faceted approach that was developed for VIFM equipment should be applicable in training programs for other safeguards equipment. (author)

  19. Entropy-Based Algorithm for Supply-Chain Complexity Assessment

    Directory of Open Access Journals (Sweden)

    Boris Kriheli

    2018-03-01

    Full Text Available This paper considers a graph model of hierarchical supply chains. The goal is to measure the complexity of links between different components of the chain, for instance, between the principal equipment manufacturer (a root node and its suppliers (preceding supply nodes. The information entropy is used to serve as a measure of knowledge about the complexity of shortages and pitfalls in relationship between the supply chain components under uncertainty. The concept of conditional (relative entropy is introduced which is a generalization of the conventional (non-relative entropy. An entropy-based algorithm providing efficient assessment of the supply chain complexity as a function of the SC size is developed.

  20. Design of supply chains: Unrealistic expectations on collaboration

    Indian Academy of Sciences (India)

    two dominant models of supply chain organization have been found. Research .... original equipment manufacturers (OEM) and vendors who cooperatively perform the tasks ... In data dimension, data structure, data exchange, data base.

  1. Power supplies and equipment for military field research: lessons from the British Service Dhaulagiri Research Expedition 2016.

    Science.gov (United States)

    Howard, Matt; Bakker-Dyos, J; Gallagher, L; O'Hara, J P; Woods, D; Mellor, A

    2018-02-01

    The British Service Dhaulagiri Research Expedition (BSDMRE) took place from 27 March to 31 May 2016. The expedition involved 129 personnel, with voluntary participation in nine different study protocols. Studies were conducted in three research camps established at 3600, 4600 and 5140 m and involved taking and storing blood samples, cardiac echocardiography and investigations involving a balance plate. Research in this remote environment requires careful planning in order to provide a robust and resilient power plan. In this paper we aim to report the rationale for the choices we made in terms of power supply, the equipment used and potential military applicability. This is a descriptive account from the expedition members involved in planning and conducting the medical research. Power calculations were used to determine estimates of requirement prior to the expedition. The primary sources used to generate power were internal combustion engine (via petrol fuelled electric generators) and solar panels. Having been generated, power was stored using lithium-ion batteries. Special consideration was given to the storage of samples taken in the field, for which electric freezers and dry shippers were used. All equipment used functioned well during the expedition, with the challenges of altitude, temperature and transport all overcome due to extensive prior planning. Power was successfully generated, stored and delivered during the BSDMRE, allowing extensive medical research to be undertaken. The challenges faced and overcome are directly applicable to delivering military medical care in austere environments, and lessons learnt can help with the planning and delivery of future operations, training exercises or expeditions. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  2. New control system: the commands of the settings equipments

    International Nuclear Information System (INIS)

    David, L.; Maugeais, C.

    1992-01-01

    The equipments allowing the setting of the GANIL beam (motors, probes, supplies...) may be operated by three distinct ways: by dial (pseudo potentiometer), by menu or by slider. These processes are described. (A.B.)

  3. Nuclear Fuel Supply Arrangements through the IAEA

    International Nuclear Information System (INIS)

    Phuong, Ha-Vinh

    1981-10-01

    By virtue of its statutory functions, the International Atomic Energy Agency may be the depositary and also the supplier of nuclear materials made available to it by Member States, and these may then be stored in facilities it has acquired or which it has established under its control. However, this possibility did not materialize, mainly because the supplying states -few in number- do not want an international organization to become directly involved in bilateral transactions in that field. This paper analyses in particular the provisions of supply agreements concluded with the United Kingdom, the USA and the USSR. The Annex contains a Table of Agreements on supply of nuclear fuel and equipment concluded between supplying and consumer states through the IAEA. (NEA) [fr

  4. Supply and usage of hemodynamic services in the state of Rio de Janeiro, Brazil

    Directory of Open Access Journals (Sweden)

    Maria de Fatima Siliansky de Andreazzi

    Full Text Available Objective: The paper analyzes the supply and the utilization of hemodynamic services in Rio de Janeiro, Brazil.Methods: It's an exploratory study that uses data obtained from Brazilian official databases. The period of supply analysis was from 1999 to 2009, and of utilization was from 2008 to October 2012.Results: Since 1999 there is a growth of hemodynamic equipment purchase. The private sector concentrates most of the supply, but it has been reducing its availability to SUS. The rate between population and equipment in Brazil exceeds the ones of some rich countries. In the sense of supply, there are in 2009, a supply rate of 1,4 equipments for 1 million inhabitants in RJ state, larger than brazilian rate, of 3,4 but the rates are similar for public customers.Conclusion: Interventional cardiology procedures have improved in the state, but in a different way. And this is because the public hospitals at Rio de Janeiro have mostly reduced their production, while the private ones have increased their production. The observed result is the SUS users performing their procedures at great distances.

  5. Exploratory Analysis of Supply Chains in the Defense Industrial Base

    Science.gov (United States)

    2012-04-01

    hp) 2- and 4- stroke RC/modeler engines are O.S. Engine (Japan), Thunder Tiger (Taiwan), and Saito (Japan). E. Global Nature of the Supply Chain...Mexico). • The 115-HP 4- stroke Rotax 914 class engine (Austria/Germany) found in the Predator (MQ-1B) is also found in many other systems, including...Equipment 43 Pumps and Compressors 44 Furnace/Steam Plant/Drying Equipment, Nuclear Reactors 45 Plumbing, Heating , and Sanitation Equipment 49

  6. Status of the maintenance for the KEK 12GEV-PS main ring and power supply

    International Nuclear Information System (INIS)

    Sato, Hikaru; Igarashi, Susumu; Marutsuka, Katsumi; Mikawa, Katsuhiko; Shirakata, Masashi; Sueno, Tsuyoshi; Tokuda, Noboru

    2004-01-01

    More than 30 years passed since the KEK 12GeV-PS construction, some of accelerator equipments are highly radiated, especially the injection and the extraction equipments. In recent years, the higher intensity beam has been required for such as the long baseline neutrino oscillation experiment and rare decay experiments. Then, the circumference of the maintenance work has become severe. Further, almost equipments of main ring and power supply have deteriorated. Status of the Maintenance for the KEK 12GeV-PS main ring and power supply are presented. (author)

  7. Remotely operated replaceable process equipment. Fernbedient austauschbare Prozessapparatur

    Energy Technology Data Exchange (ETDEWEB)

    Westendorf, H.

    1987-07-23

    The coupling process of pneumatic and electrical auxiliary lines of a pneumatic control pressure line in a large cell of the reprocessing plant is carried out, together with the coupling process of the connecting flange of the process equipment. The coupling places of the auxiliary lines, such as control or supply lines, are laid in the flange parts of the flanges to be connected. The pipe flange on the frame side remains flush with the connecting flange of the process equipment.

  8. 30 CFR 75.1107-7 - Water spray devices; capacity; water supply; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Water spray devices; capacity; water supply... Water spray devices; capacity; water supply; minimum requirements. (a) Where water spray devices are... square foot over the top surface area of the equipment and the supply of water shall be adequate to...

  9. Nevada test site water-supply wells

    International Nuclear Information System (INIS)

    Gillespie, D.; Donithan, D.; Seaber, P.

    1996-05-01

    A total of 15 water-supply wells are currently being used at the Nevada Test Site (NTS). The purpose of this report is to bring together the information gleaned from investigations of these water-supply wells. This report should serve as a reference on well construction and completion, static water levels, lithologic and hydrologic characteristics of aquifers penetrated, and general water quality of water-supply wells at the NTS. Possible sources for contamination of the water-supply wells are also evaluated. Existing wells and underground nuclear tests conducted near (within 25 meters (m)) or below the water table within 2 kilometers (km) of a water-supply were located and their hydrogeologic relationship to the water-supply well determined

  10. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  11. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Karic, Z.

    2002-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. Activity plan for year 2002 is included [sr

  12. Nuclear electronics equipment for control and monitoring panel

    International Nuclear Information System (INIS)

    Roquefort, Henri

    1980-09-01

    The purpose of this document is to fix what terminology should be used, to define the main specifications of supplies and to specify the test methods recommended to check these specifications. This document applies to low and high voltage supply sub-units fed by AC or DC mains supply and delivering direct current under stabilised DC voltage. These sub-units are used in nuclear electronics equipment and especially for reactor monitoring. Following the definition of some terms, current notations and a bibliography, the characteristics section and the corresponding test methods section are developed. Each section deals in particular with: input and output characteristics, linearity and display errors, fluctuations, influence and operation errors, variations, drift (stability), variations with the main influence quantities: mains, temperature, load, transient variations, insulation, shielding, microbreakdowns, emergency supply, electromagnetic perturbation sensitivity, reliability, maintainability and characteristics specific to certain supplies used for the polarisation of radiation detectors [fr

  13. The Mexican market for electrical equipment and services

    International Nuclear Information System (INIS)

    Robinson, J.

    1994-05-01

    Most of Mexico's electric power needs are supplied by the Comision Federal de Electricidad (CFE). Total installed capacity is ca 33,000 MW, of which ca 42% comes from oil-fired generation and 26% hydroelectric. Electricity consumption is expected to grow at ca 6%/y between 1993 and 2000; to meet this demand, CFE plans to build nearly 14,000 MW of additional generating capacity to cost ca $34 billion. A new law governing the electric power sector recently privatized electrical project construction and provided for private financing. Construction of all larger generation and transmission projects has been privatized, thereby deregulating and simplifying the bidding process for Canadian firms wishing to bid, subcontract, or supply equipment or materials. The most notable opportunities for Canadian firms are in transmission projects. The Mexican electrical manufacturing industry comprises ca 2,000 firms employing 150,000 people. Branch plants of global firms plus domestic companies supply over 70% of market demand. Production of equipment and materials for the electrical sector is well integrated with suppliers and customers, and manufacturers are seeking imports to replace abandoned product lines as the industry rationalizes. These, along with more sophisticated equipment not made in Mexico, provide opportunities for Canadian suppliers. The North American Free Trade Agreement gives preference to Canadians over offshore competitors, and eliminates many barriers to exports. Canada's Export Development Corporation provides financing with a line of credit for the electrical sector. Marketing in Mexico is best done through personal visits and capable local representation. A directory of Mexican electrical manufacturers who import is appended. 1 tab

  14. An approach for formalising the supply chain operations

    Science.gov (United States)

    Zdravković, Milan; Panetto, Hervé; Trajanović, Miroslav; Aubry, Alexis

    2011-11-01

    Reference models play an important role in the knowledge management of the various complex collaboration domains (such as supply chain networks). However, they often show a lack of semantic precision and, they are sometimes incomplete. In this article, we present an approach to overcome semantic inconsistencies and incompleteness of the Supply Chain Operations Reference (SCOR) model and hence improve its usefulness and expand the application domain. First, we describe a literal web ontology language (OWL) specification of SCOR concepts (and related tools) built with the intention to preserve the original approach in the classification of process reference model entities, and hence enable the effectiveness of usage in original contexts. Next, we demonstrate the system for its exploitation, in specific - tools for SCOR framework browsing and rapid supply chain process configuration. Then, we describe the SCOR-Full ontology, its relations with relevant domain ontology and show how it can be exploited for improvement of SCOR ontological framework competence. Finally, we elaborate the potential impact of the presented approach, to interoperability of systems in supply chain networks.

  15. Swiss hydropower in competition - an analysis with reference to the future European power supply system

    International Nuclear Information System (INIS)

    Balmer, M.; Spreng, D.; Moest, D.

    2006-01-01

    This article takes a look at a number of questions in relation to the future use of Swiss hydropower that are neither clear nor unchallenged. Questions concerning the replacement or refurbishment of hydropower schemes that will have to be renewed in the next few years are asked. Also, developments in the European power market are looked at. The future influence of wind power, trading with CO 2 certificates, increases in the price of gas etc. are examined. An analysis of the competitiveness of Swiss hydropower with reference to the European power supply system that was made by the Centre for Energy Policy and Economics CEPE at the Swiss Federal Institute of Technology ETH is described. The 'Perseus'-model developed by CEPE and the Industrial Technology Institute at the University of Karlsruhe in Germany is used to analyse possible developments over the period up to 2030. The results are presented in graphical form and commented on

  16. 41 CFR 109-26.501-54 - Communications equipment.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Communications equipment. 109-26.501-54 Section 109-26.501-54 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND...

  17. Spent fuel storage process equipment development

    International Nuclear Information System (INIS)

    Park, Hyun Soo; Lee, Jae Sol; Yoo, Jae Hyung

    1990-02-01

    Nuclear energy which is a major energy source of national energy supply entails spent fuels. Spent fuels which are high level radioactive meterials, are tricky to manage and need high technology. The objectives of this study are to establish and develop key elements of spent fuel management technologies: handling equipment and maintenance, process automation technology, colling system, and cleanup system. (author)

  18. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  19. Resistance welding equipment manufacturing capability for exports

    Energy Technology Data Exchange (ETDEWEB)

    Sastry, V.S.; Raju, Y.S.; Somani, A.K.; Setty, D.S.; Rameswara Raw, A.; Hermantha Rao, G.V.S.; Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderbad (India)

    2010-07-01

    Indian Pressurised Heavy Water Reactor (PHWR) fuel bundle is fully welded and is unique in its design. Appendage welding, end closure welding, and end plate welding is carried out using resistance welding technique. Out of many joining processes available, resistance-welding process is reliable, environment friendly and best suitable for mass production applications. Nuclear Fuel Complex (NFC), an industrial unit is established in Hyderabad, under the aegis of the Dept of Atomic Energy to manufacture fuel for Pressurised Heavy Water Reactors. From inception, NFC has given importance for self-reliance and indigenization with respect to manufacturing process and equipment. Sintering furnaces, centreless grinders, appendage-welding machines, end-closure welding equipment and end-plate welding equipments, which were initially imported, are either indigenized or designed and manufactured in house. NFC has designed, manufactured a new appendage-welding machine for manufacturing 37 element fuel bundles. Recently NFC has bagged an order from IAEA through international bidding for design, manufacture, supply, erection and commissioning of end-closure welding equipment. The paper gives in detail the salient features of these welding equipment. (author)

  20. Computer Aided Reference Services in the Academic Library: Experiences in Organizing and Operating an Online Reference Service.

    Science.gov (United States)

    Hoover, Ryan E.

    1979-01-01

    Summarizes the development of the Computer-Aided Reference Services (CARS) division of the University of Utah Libraries' reference department. Development, organizational structure, site selection, equipment, management, staffing and training considerations, promotion and marketing, budget and pricing, record keeping, statistics, and evaluation…

  1. 47 CFR 15.101 - Equipment authorization of unintentional radiators.

    Science.gov (United States)

    2010-10-01

    ... radiators. 15.101 Section 15.101 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY... initiation of marketing, as follows: Type of device Equipment authorization required TV broadcast receiver... external switching power supplies Verification. Other Class B digital devices & peripherals Verification...

  2. Physical protection equipment study. Final report

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    This report summarizes the work performed by MITRE for the U.S. Nuclear Regulatory Commission. The major products of this effort are a Catalog of Physical Protection Equipment, a Guide for Evaluation of Physical Protection Equipment, a book of Reference Materials, and a set of guidelines for use in the development of a methodology for measuring levels of security system effectiveness. A summary of recommendations resulting from this study is also presented

  3. Configuration control during maintenance of safety related equipment

    International Nuclear Information System (INIS)

    Irish, C.S.

    2001-01-01

    Possibly the most important aspect of performing maintenance of safety related equipment is maintaining the component's original design basis. Assuring that the repaired item will perform the same safety function within the original performance and equipment qualification parameters is commonly referred to as configuration control. Maintaining configuration control of a technologically current well documented item is easy. Unfortunately, this does not describe most safety related items requiring maintenance within the global nuclear industry. Items such as motors, transformers, metal clad switchgear (low and medium voltage circuit breakers), refrigeration compressors, and electronic components (i.e. circuit boards, power supplies, regulators, etc.) which routinely require repair have been in service for twenty plus years. As a result, finding replacement parts and or material to repair the items to the original condition is becoming more and more difficult. An added difficulty is the lack of original technical documentation available on the item which is being repaired. The lack of technical documentation makes it difficult to identify replacement material and parts when the original part or material is not available. The lack of documentation also makes it difficult to test the repaired item to make sure that the original configuration has been maintained after the repair. The presentation will discuss the details of repairing various items including motors, metal clad switchgear, refrigeration compressors and power supplies and the controls which are necessary to maintain the configuration of the original item. The discussion will include the Quality Assurance and engineering necessary to identify and evaluate replacement material and parts necessary to perform repairs on safety related equipment when the original material or part is not available. Examples of repairs which required different parts or materials than the original to be used in the repair will be

  4. Configuration control during maintenance of safety related equipment

    International Nuclear Information System (INIS)

    Irish, C.S.

    2003-01-01

    Possibly the most important aspect of performing maintenance of safety related equipment is maintaining the component's original design basis. Assuring that the repaired item will perform the same safety function within the original performance and equipment qualification parameters is commonly referred to as configuration control. Maintaining configuration control of a technologically current well documented item is easy. Unfortunately, this does not describe most safety related items requiring maintenance within the global nuclear industry. Items such as motors, transformers, metal clad switchgear (low and medium voltage circuit breakers), refrigeration compressors, and electronic components (i.e. circuit boards, power supplies, regulators, etc.) which routinely require repair have been in service for twenty plus years. As a result, finding replacement parts and or material to repair the items to the original condition is becoming more and more difficult. An added difficulty is the lack of original technical documentation available on the item which is being repaired. The lack of technical documentation makes it difficult to identify replacement material and parts when the original part or material is not available. The lack of documentation also makes it difficult to test the repaired item to make sure that the original configuration has been maintained after the repair. The presentation will discuss the details of repairing various items including motors, metal clad switchgear, refrigeration compressors and power supplies and the controls which are necessary to maintain the configuration of the original item. The discussion will include the Quality Assurance and engineering necessary to identify and evaluate replacement material and parts necessary to perform repairs on safety related equipment when the original material or part is not available. Examples of repairs which required different parts or materials than the original to be used in the repair will be

  5. Magnet power supply for ISABELLE

    International Nuclear Information System (INIS)

    Nawrocky, R.J.; Frankel, R.F.; Thomas, M.G.

    1979-01-01

    The power supply system which will energize the superconducting magnets in the ISABELLE machine consists of some 520 computer-programmable power supplies with outputs ranging from 50 A to 4500 A. Most of the power supplies will be used for the correction of field harmonics, orbit correction and adjustment of the machine working line. During acceleration, currents in various magnet correction coils will be controlled in real time to track the main field; all power supplies must be highly stable during the stacking and storage of the beam (in some cases current regulation must be in the order of 0.001%). PS reference programs will be stored in microprocessor based function generators embedded in each power supply. Due to the large amount of stored energy in the system, the magnets must be protected during quenches. Details of the power supply and of the magnet quench protection system are described

  6. A Policy study on stabilization of heating oil supply and demand

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Bok Jae [Korea Energy Economics Institute, Euiwang (Korea)

    1999-03-01

    As a principal heating fuel for household and commercial sector, and a heat source fuel for industry, the heating oil shows its great demand intensively during a specific period (wintertime) due to its characteristics. It represents that the fluctuation of heating oil demand throughout the year is very extreme. Therefore, the stable supply of heating oil has been rising as an important task. It is desirable to develop and supply a new type of heating oil compounded of kerosene and gasoline with appropriate ratio for short- and mid-term to have a stable supply and demand of heating oil. For long-term prospect, it is desirable to supply petroleum products mixing gasoline and B-C oil as heating oil when it is equipped with combustion technology of boiler and distribution system. In this case, it is required to have investment on infrastructure for the supply of new heating oil (mixture of gasoline and B-C oil) and a proper preparatory period for the conversion of equipment (such as a boiler). The vitalization of storing oil is essential to stabilize the supply and demand of heating oil. In order to vitalize it, the price of heating oil should be determined by a market function reflecting the seasonal supply and demand circumstances. (author). 101 refs., 5 figs., 83 tabs.

  7. Estimation of Energy Not Supply

    OpenAIRE

    Zdenek Medvec; Lukas Prokop

    2008-01-01

    Damages in industrial company are raising during electrical interruption of power supply. These damages have usually different character and financial damages are most usual. Value of damage is nearly pertinent to type of industrial branch and working load of production line. Total value of customer costs depends on time of interruption. The paper refers to cost calculation based on public sources for industrial company during interruption of electrical power supply.

  8. Research on the Reliability Testing of Electrical Automation Control Equipment

    OpenAIRE

    Yongjie Luo

    2014-01-01

    According to the author’s many years’ work experience, this paper first discusses the concepts of electrical automation control equipment reliability testing, and then analyzes the test method of electrical automation control equipment reliability testing, finally, on this basis, this article discusses how to determine the reliability test method of electrical automation control equipment. Results of this study will provide a useful reference for electrical automation control equipment reliab...

  9. Protective and control relays as coal-mine power-supply ACS subsystem

    Science.gov (United States)

    Kostin, V. N.; Minakova, T. E.

    2017-10-01

    The paper presents instantaneous selective short-circuit protection for the cabling of the underground part of a coal mine and central control algorithms as a Coal-Mine Power-Supply ACS Subsystem. In order to improve the reliability of electricity supply and reduce the mining equipment down-time, a dual channel relay protection and central control system is proposed as a subsystem of the coal-mine power-supply automated control system (PS ACS).

  10. Mediating Dynamic Supply Chain Formation by Collaborative Single Machine Earliness/Tardiness Agents in Supply Mesh

    Directory of Open Access Journals (Sweden)

    Hang Yang

    2014-01-01

    Full Text Available Nowadays, a trend of forming dynamic supply chains with different trading partners over different e-marketplaces has emerged. These supply chains, which are called “supply mesh,” generally refer to heterogeneous electronic marketplaces in which dynamic supply chains, as per project (often make-to-order, are formed across different parties. Conceptually, in a supply mesh a dynamic supply chain is formed vertically, mediating several companies for a project. Companies that are on the same level horizontally are either competitors or cohorts. A complex scenario such as this makes it challenging to find the right group of members for a dynamic supply chain. Earlier on, a multiagent model called the collaborative single machine earliness/tardiness (CSET model was proposed for the optimal formation of make-to-order supply chains. This paper contributes the particular agent designs, for enabling the mediation of CSET in a supply mesh, and the possibilities are discussed. It is demonstrated via a computer simulation, based on samples from the U.S. textile industry, that by using intelligent agents under the CSET model it is possible to automatically find an ideal group of trading partners from a supply mesh.

  11. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  12. Development of equipment qualification requirements for NPP instrumentation and control systems

    International Nuclear Information System (INIS)

    Siora, A. A.; Reshetitskij, S. V.; Harybin, A. V.

    2012-01-01

    The main stages of equipment qualification are presented. The aim of the work is to ensure compatibility between Ukrainian and international requirements. A comparison with US NRC requirements has been done. The approach in equipment qualification is presented for the resistance to: irradiation; dust; seismic motion, vibrations and mechanical impact; environmental impact (temperature, humidity, pressure); power supply parameters etc., as well as the technological testing

  13. Simulation of dynamics behaviors for shipping equipment support with system dynamics analysis approach

    Directory of Open Access Journals (Sweden)

    Yang Song

    2015-05-01

    Full Text Available Purpose: The exactly and precisely supply of carrying spare parts has a crucial impact on support and could improve the performance of equipment. Spare parts support is the crux work which will be limited by spare parts allocation and support cost input. Reasonable support strategy can help in making good use of available resources and support the equipment in normal operational status. The purpose of this paper is to propose a dynamics model of spare parts support process based on considering the interaction of multiple factors, and explores the regulation of dynamics behavior in the system. In order to achieve the optimization strategy to improve the effect of support so that will enhance the relevant support parameters of equipment. Design/methodology/approach: Meditate the feedback relationship among some important factors of support that involve support cost, support time and maintenance ability. System dynamics theory is adopted to propose a dynamics model of spare parts support process, on the analysis of multiple factors and casual relationship to find some major ones which have crucial impact on spare parts support. Spare parts support cost and availability was regarded as the control objective, moreover, adjust the control paramours and improve the effect of cannibalization and lateral supply scheduling strategy for spares support. Findings: The factors of spare parts supply, demand and maintenance have relationship of control feedback, and adjust the value of some crucial factors can reduce the support cost and improve the availability value. The main finding is that adopting cannibalization strategy under condition of available materials can relieve the mission and operational availability decline caused by shortage of spare parts. Combining the lateral supply and cannibalization strategy can reduce the inventory of warship carrying spare parts. Practical implications: By controlling the value of key factors regarding aspect of spare

  14. The Complexity Uncertain Analysis about Three Differences Old and New Product Pricing Oligarch Retailers Closed-Loop Supply Chain

    Directory of Open Access Journals (Sweden)

    Junhai Ma

    2014-01-01

    Full Text Available This paper studied some realistic recycle fields at present in China, such as some daily machinery and equipment, electronic products, and plastic products. Under such circumstance, three oligarch retailers are a common situation. In this paper, we model and analyze the game of three oligarch retailers in a closed-loop supply chain. The stability of the Nash equilibrium, the bifurcation and chaos phenomenon of the recycling price and new product quantity when retailers change its adjustment speed, the profit trends of the three retailers, and the power spectrum are studied. At last, we used the parameter adjustment and the variable state feedback control strategy for chaos control, and the chaos of the system is delayed effectively. For closed-loop supply chain research, the conclusions of the numerical simulation in this paper not only have realistic guiding significance, but also have theoretical reference value.

  15. How to Secure UPS Operation And Supply of Safety Critical Load During Abnormal Conditions in Upstream Supply

    International Nuclear Information System (INIS)

    Andersen, Gert; Kissling, Silvan; Laaser, Joerg

    2015-01-01

    UPS system design margins are usually given by manufacturer, but the events in Forsmark showed that these margins are not sufficient to protect UPS equipment and secure supply to critical loads. To withstand such events, it is not enough just to define margins for particular equipment. The overall plant design including environmental influences must be taken into consideration. For extreme environmental conditions, a UPS must include protection which design is matching to the upstream plant equipment. Immunity against abnormal conditions can not be finally guaranteed by higher margins. A limitation that excludes such influences must be implemented into the design. This presentation discusses possibilities to specify design margins, for rectifiers and inverters based on GUTOR thyristor and IGBT technology. It shows protection features to resist and solutions to limit overvoltages. (authors)

  16. Analysing biomass torrefaction supply chain costs.

    Science.gov (United States)

    Svanberg, Martin; Olofsson, Ingemar; Flodén, Jonas; Nordin, Anders

    2013-08-01

    The objective of the present work was to develop a techno-economic system model to evaluate how logistics and production parameters affect the torrefaction supply chain costs under Swedish conditions. The model consists of four sub-models: (1) supply system, (2) a complete energy and mass balance of drying, torrefaction and densification, (3) investment and operating costs of a green field, stand-alone torrefaction pellet plant, and (4) distribution system to the gate of an end user. The results show that the torrefaction supply chain reaps significant economies of scale up to a plant size of about 150-200 kiloton dry substance per year (ktonDS/year), for which the total supply chain costs accounts to 31.8 euro per megawatt hour based on lower heating value (€/MWhLHV). Important parameters affecting total cost are amount of available biomass, biomass premium, logistics equipment, biomass moisture content, drying technology, torrefaction mass yield and torrefaction plant capital expenditures (CAPEX). Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. The improvement of maintenance service for traction networks equipment on the base of process approach

    Directory of Open Access Journals (Sweden)

    D. V. Mironov

    2014-12-01

    Full Text Available Purpose. The new methods development for improving the maintenance service for equipment of traction networks in order to increase its efficiency and quality. Methodology. In world practice of solving problems related to the quality of products and services is usually achieved by introducing quality management system in to the enterprises. The provisions of quality management system were used for solving the problem. The technologies of process engineering were used for describing the main stages of maintenance service. Findings. The development of high-speed movement and growth of its intensity, the use of electric rolling stock of a new generation require the introduction of new methods diagnostics of equipment technical state and improvement of the existing maintenance system and repair of power supply. Developing a model of business-processes, their optimization with using techniques of process engineering and system management is needed for the transition to the management system based on the process approach. From the standpoint of the process approach and in accordance with the requirements of the quality management system (ISO 9001-2009, the operation of the E (Department of electrification and power supply infrastructure sector is represented as a scheme of business-processes in which the guaranteed supply with electricity of railway and third-party consumers is defined as the main business-process of management. Each of the sub-process of power supply for consumers is described in details. The use methods and main stages of process approach for sample management system reorganization were investigated. The methodology and the application method of PDCA (Plan-Do-Check-Act closed loop to the equipment maintenance system were described. The monitoring process of traction networks maintenance using the process approach was divided into components after investigations. The technical documentation of maintenance service was investigated in

  18. Use of ice storage equipment in the food industry

    Energy Technology Data Exchange (ETDEWEB)

    Vries, H. de

    1984-01-01

    The manufacture of foods in its widest sense demands a 'balanced supply of cooling'. Whenever 'cold requirement' occurs in different ways during production, the ice storage equipment in particular for 'cooling supplies'. The cooling performance (amount of cold from horizontal tubes and slabs or from horizontal pipes given off to the water flowing past) that can be expected from modern ice storage equipment, is made clear numerically. The way the storage vessel is constructed and its design have particular influence on the energy-saving quality (stirring mechanism with high performance at low pump capacity). Optimisation results for a plate evaporator design combined with a heat exchange system are presented. These include running cost savings of up to 18% in a yoghurt factory, a maltery and an ice cream factory. By means of this heat pump compound, environmental energy can be used in cold storage.

  19. NASA Ames Research Center 60 MW Power Supply Modernization

    Science.gov (United States)

    Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)

    2001-01-01

    The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.

  20. Environmental management the supply chain perspective

    CERN Document Server

    Wong, Christina W Y; Lun, Y H Venus; Cheng, T C E

    2015-01-01

    In view of the increasing quest for environmental management in businesses, this book provides a good reference to firms to understand how they may manage their supply chains to improve business and environmental performance. The book consists of six chapters covering such topics as environmental management, environmental management practices with supply chain efforts, collaborative environmental management, organizational capabilities in environmental management, environmental disclosure, and closed-loop supply chains. The book presents theory-driven discussions on the link between environmental management and business performance in the context of supply chain management. The book will be useful for firms to learn from the research findings and real-life cases to develop plans to implement environmental management practices jointly with supply chain partners.

  1. Observations vs. theory of household labor supply vol. I

    OpenAIRE

    Obi, Keiichiro

    1986-01-01

    In this paper I shall be using three different units of laborsupply; labor supply in man units, in hourly units, and in man-hour units.The first category, labor supply in man units, indicates the quantity oflabor supplied as measured by the number of persons who are willing to work.Labor supply in hourly units refers to the quantity of percapita labor supplymeasured in hourly units. Finally, labor supply in man-hour units indicatesthe quantity of labor supplied by a group of persons measured ...

  2. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  3. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-05-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between: 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The contribution at hand deals with the cases under 1) and 2); cases 3) and 4) are dealt with in an article to be published. Relevant contract clauses and laws and their effects on contracting partners are discussed. 41 references.

  4. Exposure parameters in fluoroscopy equipment. Quality control

    International Nuclear Information System (INIS)

    Alonso, M.; Castaneda, M.J.; Matorras, P.; Diaz-Caneja, N.; Gutierrez, I.

    1992-01-01

    Within the quality control program in Diagnostic Radiology currently being undertaken at the 'Marques de Valdecilla' University Hospital, the corresponding specification and procedure prototypes for the control of conventional radioscopy equipment have been elaborated and applied. This paper presents the values proposed in the specifications and those obtained for the following radioscopy equipment parameters: reference kerma, and its reproducibility, kerma linearity, maximum kerma at the skin, and total filtration. The results obtained indicate that the equipment studied could comply with specified requirements if a Maintenance Program were to be implemented in coordination with the Quality Control Program. (author)

  5. Teaching Supply Chain Management Complexities: A SCOR Model Based Classroom Simulation

    Science.gov (United States)

    Webb, G. Scott; Thomas, Stephanie P.; Liao-Troth, Sara

    2014-01-01

    The SCOR (Supply Chain Operations Reference) Model Supply Chain Classroom Simulation is an in-class experiential learning activity that helps students develop a holistic understanding of the processes and challenges of supply chain management. The simulation has broader learning objectives than other supply chain related activities such as the…

  6. Reliability performance of standby equipment with periodic testing

    International Nuclear Information System (INIS)

    Sim, S.H.

    1985-11-01

    In this report, the reliability performance of standby equipment subjected to periodic testing is studied. analytical expressions have been derived for reliability measures, such as the man accumulated operating time to failure, the expected number of tests between two consecutive failures, the mean time to failure following an emergency start-up and the probability of failing to complete an emergency mission of a specified duration. These results are useful for the reliability assessment of standby equipment such as combustion turbine units of the emergency power supply system, and of the Class III power system at a nuclear generating station

  7. Catalog of physical protection equipment. Book 1: Volume I. Barriers and structural components

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    A catalog of commercially available physical protection equipment has been prepared for use by the U.S. Nuclear Regulatory Commission (NRC). Included is information on barrier structures and equipment, interior and exterior intrusion detection sensors, entry (access) control devices, surveillance and alarm assessment equipment, contraband detection sensors, automated response equipment, general purpose displays and general purpose communications, with one volume devoted to each of these eight areas. For each item of equipment the information included consists of performance, physical, cost and supply/logistics data. The entire catalog is contained in three notebooks for ease in its use by licensing and inspection staff at NRC

  8. Catalog of physical protection equipment. Book 3: Volume VII. General purpose display components

    International Nuclear Information System (INIS)

    1977-06-01

    A catalog of commercially available physical protection equipment has been prepared under MITRE contract AT(49-24)-0376 for use by the U. S. Nuclear Regulatory Commission (NRC). Included is information on barrier structures and equipment, interior and exterior intrusion detection sensors, entry (access) control devices, surveillance and alarm assessment equipment, contraband detection sensors, automated response equipment, general purpose displays and general purpose communications, with one volume devoted to each of these eight areas. For each item of equipment the information included consists of performance, physical, cost and supply/logistics data. The entire catalog is contained in three notebooks for ease in its use by licensing and inspection staff at NRC

  9. Regulated-current dc power supply for gaseous-discharge lamps

    Science.gov (United States)

    Freeman, W.; Huguenin, D.

    1970-01-01

    Controlled current source having a high output resistance feeds continuous-flow hydrogen lamps in vacuum-ultraviolet photometric equipment. The power supply, also used with low-pressure sealed lamps, has a short recovery time and smooth regulation without overshoot.

  10. Conceptual study on HTGR-IS hydrogen supply system using organic hydrides

    International Nuclear Information System (INIS)

    Terada, Atsuhiko; Noguchi, Hiroki; Takegami, Hiroaki; Kamiji, Yu; Inagaki, Yoshiyuki

    2012-02-01

    We have proposed a hydrogen supply-chain system, which is a storage/supply system of large amount of hydrogen produced by HTGR-IS hydrogen production system. The organic chemical hydride method is one of the candidate techniques in the system for hydrogen storage and transportation. In this study, properties of organic hydrides and conventional hydrogen storage/supply system were surveyed to make use of the conceptual design of the hydrogen supply system using an organic hydrides method with VHTR-IS hydrogen production process (hydrogen production: 85,400 Nm 3 /h). Conceptual specifications of the main equipments were designed for the hydrogen supply system consisting of hydrogenation and dehydrogenation process. It was also clarified the problems of hydrogen supply system, such as energy efficiency and system optimization. (author)

  11. Impact of radio-frequency identification (RFID) technologies on the hospital supply chain: a literature review.

    Science.gov (United States)

    Coustasse, Alberto; Tomblin, Shane; Slack, Chelsea

    2013-01-01

    Supply costs account for more than one-third of the average operating budget and constitute the second largest expenditure in hospitals. As hospitals have sought to reduce these costs, radio-frequency identification (RFID) technology has emerged as a solution. This study reviews existing literature to gauge the recent and potential impact and direction of the implementation of RFID in the hospital supply chain to determine current benefits and barriers of adoption. Findings show that the application of RFID to medical equipment and supplies tracking has resulted in efficiency increases in hospitals with lower costs and increased service quality. RFID technology can reduce costs, improve patient safety, and improve supply chain management effectiveness by increasing the ability to track and locate equipment, as well as monitoring theft prevention, distribution management, and patient billing. Despite ongoing RFID implementation in the hospital supply chain, barriers to widespread and rapid adoption include significant total expenditures, unclear return on investment, and competition with other strategic imperatives.

  12. Impact of Radio-Frequency Identification (RFID) Technologies on the Hospital Supply Chain: A Literature Review

    Science.gov (United States)

    Coustasse, Alberto; Tomblin, Shane; Slack, Chelsea

    2013-01-01

    Supply costs account for more than one-third of the average operating budget and constitute the second largest expenditure in hospitals. As hospitals have sought to reduce these costs, radio-frequency identification (RFID) technology has emerged as a solution. This study reviews existing literature to gauge the recent and potential impact and direction of the implementation of RFID in the hospital supply chain to determine current benefits and barriers of adoption. Findings show that the application of RFID to medical equipment and supplies tracking has resulted in efficiency increases in hospitals with lower costs and increased service quality. RFID technology can reduce costs, improve patient safety, and improve supply chain management effectiveness by increasing the ability to track and locate equipment, as well as monitoring theft prevention, distribution management, and patient billing. Despite ongoing RFID implementation in the hospital supply chain, barriers to widespread and rapid adoption include significant total expenditures, unclear return on investment, and competition with other strategic imperatives. PMID:24159272

  13. Adventitious X-radiation from high voltage equipment

    International Nuclear Information System (INIS)

    Martin, E.B.M.

    1979-01-01

    The monograph is concerned with hazards of unwanted x-rays from sources such as television receivers, high voltage equipment, radar transmitters, switchgear and electron beam apparatus for welding, evaporation, analysis and microscopy. Chapters are included on units, production of x radiation, biological effects, protection standards, radiation monitoring, shielding and control of access, medical and dosimetric supervision and types of equipment. A bibliography of 92 references and other cited literature is included. (U.K.)

  14. Electromagnetic compatibility for the control and command equipments in nuclear power plants

    International Nuclear Information System (INIS)

    Buisson, J.

    1985-06-01

    Different kinds of electrical interference produce some disturbance on electronic sub-assemblies used to assume the control and the command of nuclear reactors. Following interferences are described: power supply lines perturbations, potential difference between grounding connections, electromagnetic fields. A method is described for testing the EMC of different equipments. The advantages of this method are: no destructive method, usable for testing equipment ''in situ'' in operating conditions on nuclear power plant, usable for testing equipment before operating conditions (acceptance test), level of the testing signals similar to the electrical interference level induced by the electromagnetic environment in normal operating conditions, no particular equipment and installation for test are required [fr

  15. Metering apparatus and tariffs for electricity supply

    International Nuclear Information System (INIS)

    1990-01-01

    Conference papers presented cover system economies and tariff structure with papers on pricing of electricity and new metering technologies. Other topics reviewed include metering apparatus design, electronic metering apparatus and solid phase metering technology. Meter data retrieval, bulk supply metering, test equipment and maintenance, and legal requirements and standards are discussed. (author)

  16. Systems approach to design of power supply to mines

    Energy Technology Data Exchange (ETDEWEB)

    Shul' ga, Yu I; Voloshko, A V

    1986-09-01

    Optimization of power supplies to underground coal mines in the USSR is evaluated. Systems analysis of power systems is discussed. Power system of a coal mine is treated as an element of the branch power system which forms a subsystem of the local and national power system. Design of a system for computerized control of power supplies to underground coal mines is evaluated. Elements of the system, control equipment, types of information stored and processed by the system as well as economic efficiency of using computerized control for power supply in underground mining are discussed. Recommendations for computer-aided design of power systems and use of computerized control systems for power supply in underground coal mining in the USSR are made.

  17. The Indian Automotive Industry and the ASEAN Supply Chain Relations

    OpenAIRE

    Tristan Leo Dallo AGUSTIN; Martin SCHRODER

    2015-01-01

    The topic of automotive supply chains has been increasingly studied as it raises questions of economic development, especially from the perspectives of simultaneous globalisation and regionalisation, and trade. While ASEAN is a prime example of intraregional production networks, supply chains that connect ASEAN and India have not been studied indepth. Therefore, this paper investigates the Indian automotive industry, which is composed of automobile original equipment manufacturers (OEMs) and ...

  18. Areva - 2014 Reference document

    International Nuclear Information System (INIS)

    2015-01-01

    Areva supplies high added-value products and services to support the operation of the global nuclear fleet. The company is present throughout the entire nuclear cycle, from uranium mining to used fuel recycling, including nuclear reactor design and operating services. Areva is recognized by utilities around the world for its expertise, its skills in cutting-edge technologies and its dedication to the highest level of safety. Areva's 44,000 employees are helping build tomorrow's energy model: supplying ever safer, cleaner and more economical energy to the greatest number of people. This Reference Document contains information on Areva's objectives, prospects and development strategies. It contains estimates of the markets, market shares and competitive position of Areva. Contents: 1 - Person responsible; 2 - Statutory auditors; 3 - Selected financial information; 4 - Risk factors; 5 - Information about the issuer; 6 - Business overview; 7 - Organizational structure; 8 - Property, plant and equipment; 9 - Analysis of and comments on the group's financial position and performance; 10 - Capital resources; 11 - Research and development programs, patents and licenses; 12 - Trend information; 13 - Profit forecasts; 14 - Administrative, management and supervisory bodies and senior management; 15 - Compensation and benefits; 16 - Functioning of administrative, management and supervisory bodies and senior management; 17 - Employees; 18 - Principal shareholders; 19 - Transactions with related parties; 20 - Financial information concerning assets, financial positions and financial performance; 21 - Additional information; 22 - Major contracts; 23 - Third party information, statements by experts and declarations of interest; 24 - Documents on display; 25 - information on holdings; appendix: Report of the Chairman of the Board of Directors on governance, internal control procedures and risk management, Statutory Auditors' report, Corporate social

  19. Energy costs and Portland water supply system

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, W.M.; Hawley, R.P.

    1981-10-01

    The changing role of electrical energy on the Portland, Oregon, municipal-water-supply system is presented. Portland's actions in energy conservation include improved operating procedures, pump modifications, and modifications to the water system to eliminate pumping. Portland is implementing a small hydroelectric project at existing water-supply dams to produce an additional source of power for the area. Special precautions in construction and operation are necessary to protect the high quality of the water supply. 2 references, 7 figures.

  20. International Conference SES 2006. Secure Energy Supply

    International Nuclear Information System (INIS)

    2006-01-01

    The International Conference SES 2006 (Secure Energy Supply, Bezpecna dodavka energie) was realised in Bratislava, during September 26 - 29, 2006 in the hotel Crowne Plaza and deals with most important problems of world and Slovak energetics. In work of Conference took part 108 slovak and 33 foreign participant from 11 countries of the world. Negotiations were realised in five sessions. First two days were devoted to lectures and second two days were visits of selected slovak energetic equipment. On the Conference has resounded matter of fact, that secure energy supply is extremely important subject for economy, but also for population

  1. Process modelling in demand-driven supply chains: A reference model for the fruit industry

    NARCIS (Netherlands)

    Verdouw, C.N.; Beulens, A.J.M.; Trienekens, J.H.; Wolfert, J.

    2010-01-01

    The growing importance of health in consumption is expected to result in a significant increase of European fruit demand. However, the current fruit supply does not yet sufficiently meet demand requirements. This urges fruit supply chains to become more demand-driven, that is, able to continuously

  2. Troubleshooting of signal power supply system for Shanghai metro line 7

    Science.gov (United States)

    Lu, Kaixia; Xiao, Jie

    2018-03-01

    With the rapid development of Urban Rail Transit Signal Technology, the demand of signal power supply system for signal equipment is higher and higher. The signal intelligent power supply panel is the main component of the urban rail traffic signal power supply system. Whether the intelligent power supply panel working or not is directly related to traffic safety. The maintenance of intelligent signal power supply panel is particularly important. Line 7 of Shanghai Metro adopts PMZG Signal Intelligent Power Supply Panel, which is produced by Beijing Jinyujiaxin Polytron Technologies Inc. Maintenance of power supply system mainly includes routine maintenance and troubleshooting. This article will make clear the routine maintenance contents of PMZG Signal Intelligent Power Supply Panel, and put forward the common fault information and troubleshooting methods of PMZG Signal Intelligent Power Supply Panel. In accordance with the steps of fault handling, the faults can be eliminated in the shortest possible time, and PMZG Signal Intelligent Power Supply Panel can be quickly restored to normal working state.

  3. Proposed water-supply investigations in Sidamo Province, Ethiopia

    Science.gov (United States)

    Phoenix, David A.

    1966-01-01

    The present report describes the results of an air and ground hydrologic reconnaissance of some 32,000 square kilometers in Sidamo Province of southern Ethiopia. Existing (1966) water resources developments, chiefly for livestock and village supplies, include surface reservoirs, a few drilled wells, several clusters of dug wells in the Mega area, several scattered springs, and the perennial Dawa Parma River. Surface-water reservoirs range from hand-dug ponds of a few hundred cubic meters capacity to large machine-constructed excavations built to hold 62,000 cubic meters of water. All the existing drilled wells tap saturated alluvium at depths of less than 120 meters. The dug wells tap water-bearing zones in tuffaceous lacustrine deposits or stream-channel alluvium generally at depths of less than 30 meters. The springs mostly rise from fractured Precambrian quartzite and individual discharges are all less than 75 liters per minute. The report also outlines the terms of reference for a longer term water-resources investigation of the region including staffing, housing and equipment requirements and other logistic support.

  4. Improvements in the equipment for determination of Kr-85 with the reference method; Variaciones y mejoras del equipo utilizado como referencia para la concentracion y separacin criogenica cromatografica del Kr-85

    Energy Technology Data Exchange (ETDEWEB)

    Heras, M. M.; Perez, M. M.

    1983-07-01

    A new equipment for Kr-85 separation and their cryogenic chromatographic concentration is described, which presents some advantages respect the equipment used as reference. The new apparatus, made with metallic elements, is based on the method of concentration and separation previously described but presents easier control, faster chromatographic separations and without loosed of efficiency and reproducibility that the previous one. The concentration and separation procedure for Kr-85 and a comparative study between both apparatus is described. Also the efficiency of the method is obtained experimentally. (Author)

  5. The impact of customer-specific requirements on supply chain management

    Directory of Open Access Journals (Sweden)

    Hubert I.P. Conceivious

    2010-11-01

    Full Text Available The complexities of being a supplier to motorcar manufacturers, also known as original equipment manufacturers (OEMs, provide an array of challenges to component manufacturers. Customer-specific requirements (CSRs add to the convolutions of a supplier’s quality management systems when producing components for the various motor manufacturers. The catalytic converter industry (CCI forms part of the component supply chain in the motor industry. The CCI consists of a plethora of suppliers to produce the catalytic converter. This paper focuses on three of the five main suppliers, namely the ‘monolith substrate manufacturers’, the ‘coaters’, and the ‘canners’. Most OEMs required that critical and strategic suppliers should be ISO/TS 16949:2009 certified. ISO/TS 16949:2009 refers to an internationally recognised specification, specifically adapted for the motor industry. The specification indicates the minimum requirements and also makes provision for additional requirements known as CSRs that can be specified by the OEM.

  6. Electronic supply system ''BING'' for vibrating wire strain gauges

    International Nuclear Information System (INIS)

    Himmler, H.

    1976-02-01

    In the Austrian project Prestressed Concrete Pressure Vessel-High Temperature Helium Test Rig a great number of strain gauges is to be monitored continuously. For these measurements an electronic supply equipment had to be developed and built. The problem was solved by the ''BING'' system, which transmits an electromagnetic impulse to the string of the strain gauge thus enabling a measurement of frequency and temperature. The equipment has been in use for 1 1/2 years without major troubles. (author)

  7. Dynamic monitoring equipment for earthworks and sub grades

    International Nuclear Information System (INIS)

    Alvarez de Sotomayor, R.

    2013-01-01

    This paper take into account some dynamic auscultation equipment s that currently are available in Spain for compaction quality control on earthworks and sub grades. Closed to the equipment description, a deformation modulus calculus approximation has been developed for each of them. A standards checking has been made from national and European point of view. some important research works that have been developed in our country about dynamic monitoring equipment s for quality control in earthworks has been mentioned. In addition to this, some variables are analyzed which have an influence on deformation modulus calculi and a possibility for comparing the equipment modulus calculated with a reference laboratory test has been offered. (Author) 18 refs.

  8. [Equipment design for magnetic therapy and "Polus" devices].

    Science.gov (United States)

    Viktorov, V A; Malkov, Iu V

    1994-01-01

    Low-frequency magnetotherapy is among the most original therapeutical techniques since it is effective in treating most diseases and has practically no contraindications. Due to atraumaticity of a low-frequency electromagnetic field, the application of magnetotherapy is indicated in geriatric care, in particular. The VNIIMP-VITA Joint-Stock Company has developed a family of the Polyus system equipment for magnetotherapy, whereby all the well-known therapeutical procedures of low-frequency magnetotherapy can be performed. The magnetotherapeutic room equipped with Polyus-2D, Polyus-3, and Polyus-4 ensures a complete set of magneto-therapeutical exposure. The rooms are supplied by the VNIIMP-VITA Joint-Stock Company.

  9. Electrical equipment distributors assuming greater role as suppliers to electric utilities

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    A survey was conducted of Canada's largest distributors of electrical equipment to the utility market. Summaries are presented of the views of the major respondents concerning market trends and future challenges. Distributors have emerged as a supply source to utilities over the past two decades. Before then, electric utilities did virtually all their business directly with the manufacturers and rarely with distributors. One reason for this situation was that direct dealing with manufacturers was perceived by the utilites as providing better access to technical advice. Distributors have grown significantly since then and many have their own expert technical staff and provide full support for their products. Various advantages for utilities in dealing with distributors are noted: ability to supply most needs relatively rapidly from stock, simplification of ordering, improved inventory management, and savings in brokerage and other costs associated with imported equipment

  10. The evolving role of supply chain management technology in healthcare.

    Science.gov (United States)

    Langabeer, Jim

    2005-01-01

    The healthcare supply chain is a vast, disintegrated network of products and players, loosely held together by manual and people-intensive processes. Managing the flow of information, supplies, equipment, and services from manufacturers to distributors to providers of care is especially difficult in clinical supply chains, compared with more technology-intense industries like consumer goods or industrial manufacturing. As supplies move downstream towards hospitals and clinics, the quality and robustness of accompanying management and information systems used to manage these products deteriorates significantly. Technology that provides advanced planning, synchronization, and collaboration upstream at the large supply manufacturers and distributors rarely is used at even the world's larger and more sophisticated hospitals. This article outlines the current state of healthcare supply chain management technologies, addresses potential reasons for the lack of adoption of technologies and provides a roadmap for the evolution of technology for the future. This piece is based on both quantitative and qualitative research assessments of the healthcare supply chain conducted during the last two years.

  11. Problems and solutions of reliability issues for external power supply in the coal mines

    Directory of Open Access Journals (Sweden)

    И. Ю. Семыкина

    2017-08-01

    Full Text Available Restructuring of the energy sector  and liberalization of the electricity market resulted in separation of a single industry into a multitude of generating companies, federal and interregional distribution utilities, regional power providers and energy suppliers. For a number of reasons, related to the process of managing separate companies, faults in the laws and regulations, and unsatisfactory technical state of the energy equipment both on the part of distributors and consumers, reliability of energy supply faces increasing negative trends, which potentially can lead to big problems. Up to this day the energy sector does not have a developed database on the state of equipment and results of its maintenance, nor has it defined criteria to actually assess technical conditions of the equipment. The authors propose to develop and implement a mechanism aimed at technical auditing and monitoring of the engineering state of external power supply system, whose results can help in the development of more efficient and economically sound measures to improve reliability of energy supply. In recent years, a lot of attention has been paid to the issues of enhanced security of industrial power supply. However, specific characteristics of underground coal mining and enormous work load of the production process limit the applicability of developed methods and algorithms. Existing research does not address economic issues of reliable energy supply, either direct (economic damage from power interruptions, contractual security of supply, tariff regulation or indirect (charges for utility connection with a required level of reliability. There is no explicit definition for the term «autonomous energy source», nor is there a list of power receivers falling into the first and «special» categories according to their reliability. The paper contains a range of urgent problems and solutions that will increase reliability of external power supply in the coal mines.

  12. Development of superconducting equipment for fusion device

    International Nuclear Information System (INIS)

    Konno, Masayuki; Ueda, Toshio; Hiue, Hisaaki; Ohgushi, Kouzou

    1993-01-01

    At Fuji Electric Co., Ltd., the development of superconductivity was started from 1960, and superconducting equipment for fusion device has been developed for ten years. The superconducting equipment, which is developed for fusion by Fuji Electric Co., Ltd., are able to be grouped in three categories which are current lead, superconducting coil and superconducting bus-line. The current lead is an electrical feeder between a superconducting coil and an electrical power supply. The rated current of developed current lead is 30kA at continuous use and 100kA at short time use respectively. The advanced disk type coil is developed for the toroidal field coil and some coils are developed for critical current measurement. Superconductor is applied to the superconducting bus-line between the superconducting coils and the current leads, and the bus-line is being developed for the Large Helical Device. This report describes an abstract of these equipment. (author)

  13. Research on Knowledge-Oriented Supply ChainRisk Management System Model

    OpenAIRE

    Yingchun Guo

    2011-01-01

    Based on analyzing the characteristics of supply chain risk management under the influences of knowledge, in this paper integrates basic theories and methods of knowledge management into the process of risk management, builds a knowledge-oriented supply chain risk management system model, and proposes relevant strategies, presenting references for practical application of knowledge-oriented supply chain risk management. By means of acquiring, storing, sharing, and transferring supply chain ri...

  14. Optimization of heat supply systems employing nuclear power plants

    International Nuclear Information System (INIS)

    Urbanek, J.

    1988-01-01

    Decision making on the further development of heat supply systems requires optimization of the parameters. In particular, meeting the demands of peak load ranges is of importance. The heat supply coefficient α and the annual utilization of peak load equipment τ FS have been chosen as the characteristic quantities to describe them. The heat price at the consumer, C V , offers as the optimization criterion. The transport distance, temperature spread of the heating water, and different curves of annual variation of heat consumption on heat supply coefficient and heat price at the consumer. A comparison between heat supply by nuclear power plants and nuclear heating stations verifies the advantage of combined heat and power generation even with longer heat transport distances as compared with local heat supply by nuclear district heating stations based on the criterion of minimum employment of peak load boilers. (author)

  15. 29 CFR 1926.406 - Specific purpose equipment and installations.

    Science.gov (United States)

    2010-07-01

    ...—disconnecting means—(1) Motor-generator, AC transformer, and DC rectifier arc welders. A disconnecting means shall be provided in the supply circuit for each motor-generator arc welder, and for each AC transformer and DC rectifier arc welder which is not equipped with a disconnect mounted as an integral part of the...

  16. Lean in the supply chain : research and practice

    OpenAIRE

    Ugochukwu, Paschal

    2012-01-01

    Lean is a management philosophy that enhances customer value through waste elimination and continuous improvement in a system by applying lean principles, practices, and techniques. The focus on lean implementations and research had been typically a single company without extension to the entire supply chain. When the concept of lean is implemented across the entire supply chain, however, it is referred to as lean supply chain. The purpose of this thesis is to create a structure from theory a...

  17. Development of ion/proton beam equipment for industrial uses

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Byung Ho; Lee, J. H.; Cho, Y. S.; Joo, P. K.; Kang, S. S.; Song, W. S.; Kim, H. J.; Chang, G. H.; Bang, S. W

    1999-12-01

    KAERI has possessed design and fabrication technologies of various ion sources including Duoplasmatron and DuoPiGatron developed by R and D projects of the long-term nuclear technology development program. In order to industrialize ion beam equipments utilizing these ion sources, a technology transfer project for a technology transfer project for a domestic firm has been performed. Under this project, engineers of the firm have been trained through classroom lectures of ion beam principles and OJT, an ion/proton beam equipment (DEMO equipment) has been designed, assembled and commissioned jointly with the engineers. Quality of the ion sources has been quantified, and technologies for ion beam equipment construction, functional test and application research have been developed. The DEMO equipment, which consists of an ion source, power supplies, vacuum, cooling and target systems, has been fabricated and tested to secure stability and reliability for industrial uses. Various characteristic tests including high voltage insulation, beam extraction, beam current measuring, etc. have been performed. This DEMO can be utilized for ion sources development as well as ion beam process development for various industrial products. Engineers of the firm have been trained for the industrialization of ion beam equipment and joined in beam application technology development to create industrial needs of beam equipment. (author)

  18. EDF group - Reference Document 2004

    International Nuclear Information System (INIS)

    2005-01-01

    The EDF Group is an integrated energy supplier operating in a wide range of electricity-related businesses: generation, transmission, distribution, sale and trading of energy. It is the main operator in the French electricity market and one of the leading electricity groups in Europe. With an installed capacity of 125,4 GW, it contributes to the supply of energy and services to more than 42 million customers throughout the world (with approximately 36 million customers in Europe, more than 28 million of whom are in France). The EDF Group has built a business model balanced between deregulated and regulated operations in France and an international presence. In 2004, the Group recorded consolidated sales of euros 46,928 million, net income (Group share) of euros 1,341 million, and it achieved earnings before interests, taxes, depreciation and amortization of euros 12,127 million. This document is EDF Group's Reference Document for the year 2004. It contains information about: the Group activities, capital, relations with Gaz de France utility, strategy, industrial environment, history, activity in France, international activity, transverse activities and functions, disputes, arbitration and risk factors, Property, Plants and Equipment, Operating and Financial Review, Administrative, Management, and Supervisory Bodies and Senior Management, Remuneration and Benefits, recent trends and perspectives

  19. Hydropower recovery in water supply systems: Models and case study

    International Nuclear Information System (INIS)

    Vilanova, Mateus Ricardo Nogueira; Balestieri, José Antônio Perrella

    2014-01-01

    Highlights: • We present hydropower recovery models for water supply systems. • Hydropower recovery potential in water supply systems is highly variable. • The case studied could make the supply systems self-sufficient in terms of energy. • Hydropower recovery can reduce GHGs emissions and generate carbon credits. - Abstract: The energy efficiency of water supply systems can be increased through the recovery of hydraulic energy implicit to the volumes of water transported in various stages of the supply process, which can be converted into electricity through hydroelectric recovery systems. Such a process allows the use of a clean energy source that is usually neglected in water supplies, reducing its dependence on energy from the local network and the system’s operation costs. This article evaluates the possibilities and benefits of the use of water supply facilities, structures and equipment for hydraulic energy recovery, addressing several applicable hydroelectric models. A real case study was developed in Brazil to illustrate the technical, economic and environmental aspects of hydropower recovery in water supply systems

  20. New design for the anode power supply of a gyrotron

    International Nuclear Information System (INIS)

    Fasel, D.; Alberti, S.; Favre, A.; Perez, A.; Acero, J.; Ganuza, D.; Garcia, I.; Lucia, C.

    1998-01-01

    The introduction will remind the main supply structure installed in the CRPP, related to the ECRH (Electron Cyclotron Resonance Heating) project on the TCV (Tokamak Configuration Variable) tokamak. Then this paper concentrates on the description of the power source designed to supply the anode of the triode type gyrotron. First the requirements asked for this power supply will be presented, taking into account the possible feeding structures in relation with the existing HV DC cathode power supply. The following section will focus on the selected design, describing in details the power structure based on MOSFET, referred to the cathode potential. Afterwards the control electronics is presented, including the feedback control implemented, the HV measurements, the internal reference generator and the interface to the TCV control. Finally, the last section will give information on the project status. (author)

  1. Model Design on Emergency Power Supply of Electric Vehicle

    Directory of Open Access Journals (Sweden)

    Yuanliang Zhao

    2017-01-01

    Full Text Available According to the mobile storage characteristic of electric vehicles, an emergency power supply model about the electric vehicles is presented through analyzing its storage characteristic. The model can ensure important consumer loss minimization during power failure or emergency and can make electric vehicles cost minimization about running, scheduling, and vindicating. In view of the random dispersion feature in one area, an emergency power supply scheme using the electric vehicles is designed based on the K-means algorithm. The purpose is to improve the electric vehicles initiative gathering ability and reduce the electric vehicles gathering time. The study can reduce the number of other emergency power supply equipment and improve the urban electricity reliability.

  2. 42 CFR 493.1252 - Standard: Test systems, equipment, instruments, reagents, materials, and supplies.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Test systems, equipment, instruments... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY... storage of reagents and specimens, accurate and reliable test system operation, and test result reporting...

  3. DEVELOPMENT OF PERSONAL PROTECTIVE EQUIPMENT FOR DECONTAMINATION AND DECOMMISSIONING

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1999-01-01

    The purpose of this one-year investigation is to perform a technology integration/search, thereby ensuring that the safest and most cost-effective options are developed and subsequently used during the deactivation and decommissioning (D and D) of U.S. Department of Energy Environmental Management (DOE-EM) sites. Issues of worker health and safety are the main concern, followed by cost. Two lines of action were explored: innovative Personal Cooling Systems (PCS) and Personal Monitoring Equipment (PME). PME refers to sensors affixed to the worker that warn of an approaching heat stress condition, thereby preventing it. Three types of cooling systems were investigated: Pre-Chilled or Forced-Air System (PCFA), Umbilical Fluid-Chilled System (UFCS), and Passive Vest System (PVS). Of these, the UFCS leads the way. The PVS or Gel pack vest lagged due to a limited cooling duration. And the PCFA or chilled liquid air supply was cumbersome and required an expensive and complex recharge system. The UFCS in the form of the Personal Ice Cooling System (PICS) performed exceptionally. The technology uses a chilled liquid circulating undergarment and a Personal Protective Equipment (PPE) external pump and ice reservoir. The system is moderately expensive, but the recharge is low-tech and inexpensive enough to offset the cost. There are commercially available PME that can be augmented to meet the DOE's heat stress alleviation need. The technology is costly, in excess of $4,000 per unit. Workers easily ignore the alarm. The benefit to health and safety is indirect so can be overlooked. A PCS is a more justifiable expenditure

  4. Preliminary power supply design for the TF coil system of CIT

    International Nuclear Information System (INIS)

    Neumeyer, C.; Bronner, G.; Huttar, D.

    1989-01-01

    Initial operation of the Compact Ignition Tokamak (CIT) is planned with a Toroidal Field (TF) of 8 Tesla and a flat top duration of 5 seconds. Ultimately, operation will be extended beyond 8 Tesla. The power supply to be used for the initial phase of operation has been modeled using the parameters of the thyristor rectifier power supplies which are now in service for the Tokamak Fusion Test Reactor (TFTR). A subset of these existing units, or perhaps new units with similar ratings, are envisioned to be connected to the existing 138kV transmission line serving PPPL so as to take advantage of this power source for CIT. For the extended operation phase the equipment used for the initial phase of TF operation will be augmented with new equipment to permit operation up to 11 Tesla. This paper describes the preliminary design for the 8 Tesla power supply and presents results from simulation studies. In addition, issues concerning transient behavior and fault modes are discussed. 4 refs., 12 figs

  5. 36 CFR 1210.35 - Supplies and other expendable property.

    Science.gov (United States)

    2010-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property... exceeding $5,000 in total aggregate value upon termination or completion of the project or program and the... equipment. (b) The recipient shall not use supplies acquired with NHPRC funds to provide services to non...

  6. A hybrid approach based on ANP, ELECTRE and SIMANP metaheuristic method for outsourcing manufacturing procedures according to supply chain risks - Case study: A medical equipment manufacturer company in Iran

    Directory of Open Access Journals (Sweden)

    Hiwa Farughi

    2017-01-01

    Full Text Available Nowadays enterprises should consider seeking to reduce the supply chain risks as a crucial part of their activities in order to improve their competitiveness in the international context. Choosing the suitable strategy in connection with assigning some parts of the production process to outside the organization is a complex multi-criteria decision making problem and it gets more complicated when supply chain risk factors as the factors to select the strategy as well as dependence and the close ties between these criteria also be considered. In this paper, after the identification of risks in the supply chain of a medical equipment manufacturer company, dependence and ties between criteria in line with choosing the best strategy among existing alternatives has been examined in the form of a combined ANP-ELECTRE method. This combined model is of high performance to give a solution to the problem considered in this paper. But given the complex and time consuming nature of the AHP and ELECTRE, in this study a meta-heuristic algorithm is developed called SIMANP that despite the simplicity of computing and high-speed, is good in the terms of precision and efficiency. The results of comparing SIMANP algorithm and the proposed ANP - ELECTRE method are presented at the end.

  7. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE's Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated

  8. Assessment of the causes of failures of roto-dynamic equipment in Cirus

    International Nuclear Information System (INIS)

    Rao, K.N.; Singh, S.; Ganeshan, P.

    1994-01-01

    As a part of Cirus reactor life extension program study, a service life evaluation of critical roto-dynamic equipment in Cirus such as primary coolant pumps, and their concrete foundation structures, pressurised water loop pumps, main air compressors and supply and exhaust fans, was performed. An assessment of the causes of failures of roto-dynamic equipment in Cirus was done. Based on assessment of the degradation mitigating features and comparison to similar roto-dynamic equipment and their concrete foundation structures, it was concluded that life extension of these roto-dynamic equipment and their structures is feasible. To support this conclusion a program involving: a) non-destructive testing, b) surveillance and monitoring and, c) preventive maintenance is recommended. (author). 4 refs

  9. Specifications and test procedures for airline-type supplied-air suits

    International Nuclear Information System (INIS)

    Revoir, W.H.; Pritchard, J.A.; Davis, T.O.; Richards, C.P.; Wheat, L.D.

    1975-05-01

    Procedures and requirements have been established to permit airline-type supplied-air suits needed by contractors of the Energy Research and Development Administration to be tested for performance by the Respirator Research and Development Section, Industrial Hygiene Group, of the Los Alamos Scientific Laboratory, and to have the adequacy of the performance of these devices evaluated by the Los Alamos Scientific Laboratory Respirator Advisory Committee. Test equipment, test methods, and performance criteria for airline-type supplied-air suits are prescribed. (U.S.)

  10. Consumer driven supply chains: the case of Dutch organic tomato

    NARCIS (Netherlands)

    Anastasiadis, F.; Dam, van Y.K.

    2014-01-01

    Supply chain management refers to the efficient integration of various processes involved in turning resources into consumer products. Effectiveness of the supply chain is more easily understood in terms of Value Chain Management, and the integration of processes that turn resources into consumer

  11. Mechanical equipment for magnet measurement and alignment

    International Nuclear Information System (INIS)

    Harvey, A.

    1992-05-01

    The mechanical equipment for measuring and aligning (or fiducializing) magnets is described by reference to devices designed and built by a number of laboratories. Some of these are now available commercially. The descriptions are supplemented by a list of representative sources of hardware

  12. Lunar surface fission power supplies: Radiation issues

    International Nuclear Information System (INIS)

    Houts, M.G.; Lee, S.K.

    1994-01-01

    A lunar space fission power supply shield that uses a combination of lunar regolith and materials brought from earth may be optimal for early lunar outposts and bases. This type of shield can be designed such that the fission power supply does not have to be moved from its landing configuration, minimizing handling and required equipment on the lunar surface. Mechanisms for removing heat from the lunar regolith are built into the shield, and can be tested on earth. Regolith activation is greatly reduced compared with a shield that uses only regolith, and it is possible to keep the thermal conditions of the fission power supply close to these seen in free space. For a well designed shield, the additional mass required to be brought fro earth should be less than 1000 kg. Detailed radiation transport calculations confirm the feasibility of such a shield

  13. Lunar surface fission power supplies: Radiation issues

    International Nuclear Information System (INIS)

    Houts, M.G.; Lee, S.K.

    1994-01-01

    A lunar space fission power supply shield that uses a combination of lunar regolith and materials brought from earth may be optimal for early lunar outposts and bases. This type of shield can be designed such that the fission power supply does not have to be moved from its landing configuration, minimizing handling and required equipment on the lunar surface. Mechanisms for removing heat from the lunar regolith are built into the shield, and can be tested on earth. Regolith activation is greatly reduced compared with a shield that uses only regolith, and it is possible to keep the thermal conditions of the fission power supply close to those seen in free space. For a well designed shield, the additional mass required to be brought from earth should be less than 1,000 kg. Detailed radiation transport calculations confirm the feasibility of such a shield

  14. Process plant equipment operation, control, and reliability

    CERN Document Server

    Holloway, Michael D; Onyewuenyi, Oliver A

    2012-01-01

    "Process Plant Equipment Book is another great publication from Wiley as a reference book for final year students as well as those who will work or are working in chemical production plants and refinery…" -Associate Prof. Dr. Ramli Mat, Deputy Dean (Academic), Faculty of Chemical Engineering, Universiti Teknologi Malaysia "…give[s] readers access to both fundamental information on process plant equipment and to practical ideas, best practices and experiences of highly successful engineers from around the world… The book is illustrated throughout with numerous black & white p

  15. Supply chain performance within agri-food sector

    Directory of Open Access Journals (Sweden)

    Dinu Daniela Magdalena

    2016-01-01

    Full Text Available By setting the goals of this scientific paper has been outlined the research methodology. Thus were developed conclusion, and by using the methods, procedures, techniques, rules and tools and know-how has been demonstrated the central hypothesis: 'Inside the agri-food supply chain is created value through operations and logistics activities.' The value created leads to competitive advantages in order to identify companies within market, gaining loyal consumers. The article presents the components of agri-food supply chain, the main Key Performance Indicators measuring its performance, the difference between a traditional supply chain and sustainable supply chain by analyzing the waste management component. In order to get professional expertise referring to Key Performance Indicators a quantitative research has been organized. In closing the article present the development strategies of agri-food supply chain.

  16. Control units for APS power supplies

    International Nuclear Information System (INIS)

    Despe, O.D.; Saunders, C.; McGhee, D.G.

    1993-01-01

    The Advanced Photon Source (APS) accelerator facility is made up of five major subsystems in addition to the linac: the positron accumulator ring (PAR), low energy transport (LET), booster synchrotron (SYNCH), high energy transport (HET), the storage ring (SR). Each subsystem has multiple magnet power supply combinations, some requiring multiple of operation. These magnet and power supply combinations computer controlled and monitored. The power supply control unit (PSCU) is the first layer of hardware and software above the power supply itself and is described in this paper. The description includes the basic philosophy for each of operation and how it influences the topology and of implementing control. The design of the analog reference blocks (ARBs) influenced the design of other custom functions well as the feedback controls for vibration and other dynamic corrections. The command set supported by the PSCU is discussed

  17. Creation of reactor's reliable system of emergency energy supply

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Brovkin, A.Yu.; Petukhov, V.K.; Chekushin, A.I.; Chernyaev, V.P.; Yagotinets, N.A.

    1998-01-01

    System of reliable power supply of the WWR-K reactor complex is described, which completely provides safety operation of reactor equipment in the case of total voltage loss from external power transmission lines as well as under destruction of accumulation batteries by earthquake more than 6 balls. Switching on in operation of diesel-generators and system of constant current supply from accumulator batteries is occurred automatically under cessation of voltage supply from centralized power system. Reliable reactor dampening in case it work on capacity has been ensured. Reactor cooling under its emergency shutdown during both the partial or the total loss of coolant in first counter has been carried out. Under full coolant loss the system of emergency reactor cooling has been switched on in operation

  18. Research performed at the ET-RR-1 reactor using the neutron scattering equipment

    International Nuclear Information System (INIS)

    Adib, M.; Maayouf, R.M.A.; Abdel-Kawy, A.

    1990-02-01

    This report represents the results of studies and measurements, performed at the ET-RR-1 reactor, using the neutron scattering equipment supplied by the IAEA according to the technical assistance project EGY/1/11/10. The results of these studies, starting in 1980 and continuing to date, are discussed; the use of the equipment, both as a neutron monochromator and fixed scattering angle spectrometer, is also assessed. (author). 19 refs, 17 figs

  19. Overview of Mobile Equipment Used in Case of Beyond Design Basis Accident at NPP Krsko

    International Nuclear Information System (INIS)

    Lukacevic, H.; Kopinc, D.; Ivanjko, M.

    2016-01-01

    Terrorist attack in USA in the September 11, 2001 and accident at the Fukushima - Daiichi Nuclear Power Station in the March 11, 2011 highlight the importance of mitigating strategies in responding to Beyond Design Basis Accident (BDBA), while ensuring cooling of reactor core, containment and spent fuel pool. Nuclear Power Plant Krsko (NEK) has acquired additional mobile equipment and made necessary modifications on existing systems for the connection of this equipment (fast couplers). Usage of mobile equipment is not only limited to design basis accident (DBA), but, also to prevent and mitigate the consequences in case of BDBA, when other plant systems are not available. NEK also decided to take steps for upgrade of safety measures and prepared Safety Upgrade Program (SUP), which is consistent with the nuclear industry response to the Fukushima accident and is implementing main projects and modifications related to SUP. NEK mobile equipment is not required to operate under normal reactor plant operation except for periodic surveillance testing and is incorporated into the normal training process. Equipment is dislocated from the reactor building and most of the equipment is located in the new building, able to withstand extreme natural events, including earthquakes and tornadoes. The usage of all mobile equipment is prescribed as an additional option in NEK operating procedures in following cases and enables following options: filling various tanks, filling the steam generators, filling the containment, additional compressed air source, spent fuel pool refilling and spraying, alternative power supply. This document provides an overview of NEK mobile equipment, which consists of various mobile fire protection pumps, air compressors, protective equipment, fire trucks, diesel generators. Sufficient fuel supply for the equipment is provided on site for a minimum three days of operation. (author).

  20. A simulation tool for radio frequency identification construction supply chains

    NARCIS (Netherlands)

    Gassel, van F.J.M.; Jansen, G.; Zavadskas, E.K.; Kaklauskas, A.; Skibniewski, M.J.

    2008-01-01

    Radio Frequency IDentification (RFID) technology is being used more and more in the construction industry. RFID tags and peripheral equipment are becoming cheaper and more suitable for application in the supply chain. However, it is difficult for contractors to estimate the costs and benefits of

  1. Using the reference curve of a water supply system for determining the optimal operation schedule; Utilizacion de la curva de consgina de un abastecimiento de agua para determinar el regimen de explotacion mas eficiente

    Energy Technology Data Exchange (ETDEWEB)

    Iglesias Rey, P. L.; Martinez Solano, F. J.; Fuertes Miquel, V. S.; Lopez Patino, G.

    2007-07-01

    A new water inlet point in the network can modify the water supply schedule so that the distribution of flow to supply from the different points would be a problem to determine in each case. To present work uses the reference curve concept of a water supply system to propose a method that determines the appropriate distribution of water supplied using simulation models. The methodology is based on looking for the grater power efficiency in the system, assuming equal production costs in the different sources. The obtained conclusions allows to know some parameters that influence in the location of the optimal production system. At the same time, the analysis of two examples shows the reach of the propose methodology. (Author) 6 refs.

  2. Safety analysis report for packaging (onsite) decontaminated equipment self-container

    International Nuclear Information System (INIS)

    Boehnke, W.M.

    1998-01-01

    The purpose of this Safety Analysis Report for Packaging (SARP) is to demonstrate that specific decontaminated equipment can be safely used as its own self-container. As a Decontaminated Equipment Self-Container (also referred to as a self-container), no other packaging, such as a burial box, would be required to transport the equipment onsite. The self-container will consist of a piece of equipment or apparatus which has all readily removable interior contamination removed, all of its external openings sealed, and all external surfaces decontaminated to less than 2000 dpm/100 cm for gamma-emitting radionuclides and less than 220 dpm/100 CM2 for alpha-emitting radionuclides

  3. Equipes de referência e apoio especializado matricial: um ensaio sobre a reorganização do trabalho em saúde Local reference teams and specialized matrix support: an essay about reorganizing work in health services

    Directory of Open Access Journals (Sweden)

    Gastão Wagner de Sousa Campos

    1999-01-01

    Full Text Available Este artigo propõe um novo arranjo organizacional para o trabalho em saúde. É desenvolvido e ampliado o conceito de equipe de referência - proposto e experimentado pelo autor desde 1989. É também reelaborado o conceito de organização matricial do trabalho, invertendo-se em relação ao esquema original o que seria permanente e aquilo que seria transitório (recorte matricial nos serviços de saúde. São também apresentadas considerações teóricas que autorizam e justificam a construção desta nova proposta.A new organizational settlement for the work in the health services is proposed. An original concept is developed to defining the profile of a local reference team, as created and experimented by the author sice 1989. The classical organizational structure in matrix is realaborated to encompass this new approach. Theoretical consideration that subsidize and give basis to building this new proposal are presented.

  4. Online Reference Service--How to Begin: A Selected Bibliography.

    Science.gov (United States)

    Shroder, Emelie J., Ed.

    1982-01-01

    Materials in this bibliography were selected and recommended by members of the Use of Machine-Assisted Reference in Public Libraries Committee, Reference and Adult Services Division, American Library Association. Topics include: financial aspects, equipment and communications considerations, comparing databases and database systems, advertising…

  5. A Study on the Determination of Power Supply Class for HVAC System in KJRR

    International Nuclear Information System (INIS)

    Kim, Hagtae; Kim, Minjin; Suh, Yong-Suk; Kim, Jun-Yeon; Chae, Hee-Taek

    2016-01-01

    The purpose of this paper is to propose an appropriate electrical class, power supply class, and operation logic for the major equipment of the HVAC system such as a Confinement Isolation Damper (CID), Fission Molybdenum Isolation Damper (FID), Air Handling Unit (AHU), Air Cleaning Unit (ACU), and Contaminated Air Purification System (CAPS) in light of their functional requirements and importance. The classification for the overall HVAC system of the KJRR is a safety class NNS, Non-Seismic category, quality class S, and electrical class Non-1E. Exceptionally, the CID and FID are safety class 3, seismic category I, and quality class Q. The electrical class for the major equipment of the HVAC system should be determined considering the operation concept during Loss of Normal Electric Power (LOEP) regardless of the safety class. In this paper, the electrical and power supply class is determined and the operation logic is proposed for the major equipment of the HVAC system for the KJRR such as the CID, FID, CAPS, ACU, and AHU. The electrical class Non-1E is determined to implement a fail closed for the enhancement of safety. The power supply class is based on the functional requirements of each equipment. The CID, FID, CAPS, and ACU are Class III, but the AHU is Class IV by reflecting the importance and electrical load. After the recovery of the power supply, there is a difference in the operation concept for the HVAC system between the reactor building and fission molybdenum production building depending on the operator's residence time. The CID and CAPS are operated manually through procedures for checking the accident status, and the FID and ACU are operated automatically without special procedures

  6. A Study on the Determination of Power Supply Class for HVAC System in KJRR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hagtae; Kim, Minjin; Suh, Yong-Suk; Kim, Jun-Yeon; Chae, Hee-Taek [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The purpose of this paper is to propose an appropriate electrical class, power supply class, and operation logic for the major equipment of the HVAC system such as a Confinement Isolation Damper (CID), Fission Molybdenum Isolation Damper (FID), Air Handling Unit (AHU), Air Cleaning Unit (ACU), and Contaminated Air Purification System (CAPS) in light of their functional requirements and importance. The classification for the overall HVAC system of the KJRR is a safety class NNS, Non-Seismic category, quality class S, and electrical class Non-1E. Exceptionally, the CID and FID are safety class 3, seismic category I, and quality class Q. The electrical class for the major equipment of the HVAC system should be determined considering the operation concept during Loss of Normal Electric Power (LOEP) regardless of the safety class. In this paper, the electrical and power supply class is determined and the operation logic is proposed for the major equipment of the HVAC system for the KJRR such as the CID, FID, CAPS, ACU, and AHU. The electrical class Non-1E is determined to implement a fail closed for the enhancement of safety. The power supply class is based on the functional requirements of each equipment. The CID, FID, CAPS, and ACU are Class III, but the AHU is Class IV by reflecting the importance and electrical load. After the recovery of the power supply, there is a difference in the operation concept for the HVAC system between the reactor building and fission molybdenum production building depending on the operator's residence time. The CID and CAPS are operated manually through procedures for checking the accident status, and the FID and ACU are operated automatically without special procedures.

  7. Application of nuclear steam supply system of NIKA series for seawater desalination

    International Nuclear Information System (INIS)

    Adamovich, L.A.; Achkasov, A.N.; Grechko, G.I.; Pavlov, V.L.; Shishkin, V.A.

    1998-01-01

    The nuclear steam supply system (NSSS) NIKA has been developed on the basis of experience available in Russia in designing, construction and operation of similar systems for ship propulsion reactors. Major systems and equipment of the NSSS are designed to take advantage of the proven engineering features and to meet Russian regulations, standards, practices and up-to-date safety philosophy. NSSS NIKA-75 has been designed for arrangement on barge. This permits to manufacture all NSSS equipment at the factory and to deliver it to the exploitation area ready for operation. NSSS NIKA-300 is designed for erection on land. It seems very interesting to use those NSSS types for seawater desalination. The main technical solutions, concept statements, technical and economical evaluations of NIKA series nuclear steam supply systems for seawater desalination are described. (author)

  8. The Financial Supply Chain Management: a New Solution for Supply Chain Resilience

    Directory of Open Access Journals (Sweden)

    Virgil Popa

    2013-02-01

    Full Text Available In the present article, the author aims to find solutions to optimize the supply chain for the cash flow – a flow of products reversed from the physical one and the two-ways flow of information. In the last 15-20 years, academics and practitioners were oriented towards increasing the speed, cost reduction on supply chain material’s flow, oriented towards 3RP (3 Resource Planning logistics solutions and management solutions such as outsourcing or collaborative management. In terms of information flow, there has been a real revolution with the rise of the Internet and information technology standards introduced by the VICS (Voluntary Interindustry Commerce Standards, CSCMP (Council of Supply Chain Management Professionals, SCC (Supply Chain Council şi ECR Europe (Efficient Consumer Respons. The objective of this paper is to identify new ways of working together on supply chain financial flows. Methods used are the documentation in the literature and the practices of transnational companies under recession. Results refer to the identification of new solutions such as reverse factoring. A comparative analysis regarding the european and national regulations gets us to the conclusion that Romania is still tributary to traditional commercial credit. We propose that the Collaborative management, as a modus vivendi in a globalized and super computerized world, must be included within all Romanian organizations life, within the Supply Chain, but also those which are 3PL (Third Part Logistics and 4PL (Four Part Logistics organizations, where not only information services are included, but also financial services (banks and specialized financial institutions.

  9. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective

    OpenAIRE

    T?rkay, Metin; Sara?o?lu, ?zt?rk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor us...

  10. TFTR CAMAC power supplies reliability

    International Nuclear Information System (INIS)

    Camp, R.A.; Bergin, W.

    1989-01-01

    Since the expected life of the Tokamak Fusion Test Reactor (TFTR) has been extended into the early 1990's, the issues of equipment wear-out, when to refurbish/replace, and the costs associated with these decisions, must be faced. The management of the maintenance of the TFTR Central Instrumentation, Control and Data Acquisition System (CICADA) power supplies within the CAMAC network is a case study of a set of systems to monitor repairable systems reliability, costs, and results of action. The CAMAC network is composed of approximately 500 racks, each with its own power supply. By using a simple reliability estimator on a coarse time interval, in conjunction with determining the root cause of individual failures, a cost effective repair and maintenance program has been realized. This paper describes the estimator, some of the specific causes for recurring failures and their correction, and the subsequent effects on the reliability estimator. By extension of this program the authors can assess the continued viability of CAMAC power supplies into the future, predicting wear-out and developing cost effective refurbishment/replacement policies. 4 refs., 3 figs., 1 tab

  11. Valorization procedure of x-ray equipment in the mammography equipment

    International Nuclear Information System (INIS)

    Ruiz, M. A.; Ordonez, J.; Antolin, E.; Andres, J. C. de; Gonzalez, I.; Arranz, L.; Sastre, J. M.; Ferrer, N.

    2006-01-01

    The Ramon y Cajal Hospital mammography service has three X-rays units, two of them with high resolution computed radiography (CR) system and one with flat-panel (FP)-based full-field digital mammography system. Periodic control dose tests in patients have shown lower glandular dose levels (DGM) than references provided by European Protocol for de Quality Control of de Physical and Technical Aspects of Mammography Screening. In this work, we have tried to establish an easy method for DGM calculation which is representative of the three equipment results. For this aim, we have defined an index which is measured along the time like a reference point. This index is defined as the relation between the blind test punctuations of a standard phantom image given by at least three radiologists in the Unit, and the average DGM values obtained in 20 patients in each Unit (using random thickness and random mama composition). (Author)

  12. Supplier–customer relationships: Weaknesses in south african automotive supply chains

    Directory of Open Access Journals (Sweden)

    M. J. Naude

    2012-11-01

    Full Text Available The South African automotive industry, which is an important sector in the South African economy, needs to function efficiently if it is to compete internationally. However, South African automotive components manufacturers (ACMs are not internationally competitive and automotive assemblers, also known as original equipment manufacturers (OEMs, often import cheaper components from abroad. All parties in the South African automotive supply chains need each other to ensure optimal efficiency and competitiveness. Furthermore, it is vital that good relationships exist between customers and suppliers in the automotive supply chains in South Africa. ACMs are central to automotive supply chains. A survey was conducted among ACMs to determine the nature of relationships that exist between buyers and suppliers in South Africa’s automotive supply chains. The results showed that collaborative relationships do indeed exist between members of the supply chain but that communication, understanding of the parties’ situations and cooperation can improve this relationship and so create total alliance between OEMs and ACMs.

  13. Targets for Marine Corps Purchasing and Supply Management Initiatives: Spend Analysis Findings

    Science.gov (United States)

    2011-01-01

    Corps Purchasing and Supply Management Initiatives: Spend Analysis Findings source contracts with providers in them. We also examine contract “ churn ...repair, and rebuilding of equipment; general purpose ADP equipment; ADP and telecommunication ser- vices—are also shown in the previous chart for top...to $469 million in FY 2004. The spend for other ADP and telecommunication services, $264 million in FY 2004, was not even in the top ten in FY 2003

  14. Failure mode and effect analysis experimental reliability determination for the CANDU reactor equipment

    International Nuclear Information System (INIS)

    Vieru, G.

    1996-01-01

    This paper describes the experimental tests performed in order to prove the reliability parameters for certain equipment manufactured in INR Pitesti, for NPP Cernavoda. The tests were provided by Technical Specifications and test procedures. A comparison, referring to the reliability parameters, between Canadian equipment and INR manufactured equipment ones is also given. The results of tests and conclusions are shown. (author)

  15. A 244Pu spike reference material CBNM IRM-042A

    International Nuclear Information System (INIS)

    Verbruggen, A.; Gallet, M.; Hendrickx, F.; Bievre, P. de

    1991-01-01

    An highly enriched 244 Pu isotopic reference material (CBNM IRM-042a) has been prepared and certified for 244 Pu isotope concentration. The certified value of (2.257 7 ± 0.004 4).10 18 atoms 242 Pu.kg -1 of solution has been established by isotope dilution mass spectrometry. The plutonium isotopic composition has been determined by thermal ionization mass spectrometry and calibration of these measurements by means of synthetic 242 Pu/ 239 Pu mixtures. The isotopic reference material is supplied in a sealed glass ampoule containing approximately 10 g of a 5M nitric acid solution at an approximate concentration of 1 μg Pu per g solution. This isotopic reference material is part of a systematic CBNM programme to supply spike isotopic reference materials of various isotopes at different concentrations

  16. High stability, high current DC-power supplies

    International Nuclear Information System (INIS)

    Hosono, K.; Hatanaka, K.; Itahashi, T.

    1995-01-01

    Improvements of the power supplies and the control system of the AVF cyclotron which is used as an injector to the ring cyclotron and of the transport system to the ring cyclotron were done in order to get more high quality and more stable beam. The power supply of the main coil of the AVF cyclotron was exchanged to new one. The old DCCTs (zero-flux current transformers) used for the power supplies of the trim coils of the AVF cyclotron were changed to new DCCTs to get more stability. The potentiometers used for the reference voltages in the other power supplies of the AVF cyclotron and the transport system were changed to the temperature controlled DAC method for numerical-value settings. This paper presents the results of the improvements. (author)

  17. The Japanese power equipment market - potential for foreign companies

    International Nuclear Information System (INIS)

    Bell, G.D.; Matsumoto, Satoru

    1993-01-01

    The potential for foreign companies for sales of heavy electrical equipment in Japan is assessed. The Japanese heavy electrical equipment industry (HEI) has very close links with the electricity supply industry. Traditionally a small circle of domestic manufacturers have supplied all the electric utilities. However, there is criticism in Japan of the inefficiencies which have arisen as a result of the close relationship and the cost competitiveness of domestic products has been eroded by the appreciation of the yen. The chief driving force in the opening of the market to foreign products is political, though. Friction between Japan and the USA and European Community on the subject of trade imbalance, has led the Ministry of Internal Trade and Industry to encourage major utilities to increase their imports from abroad. Consequently, opportunities now exist for foreign suppliers to gain access to the Japanese HEI market but only if they are willing to make a long term investment. Market entry is still likely to be very difficult, however, and unlikely to produce quick returns. In the longer term, though, access to the Japanese market could open up even wider opportunities. (UK)

  18. Papers of the Canadian Institute's 3. annual conference : oil sands supply and infrastructure : labour supply, upgraders, transportation, pipelines

    International Nuclear Information System (INIS)

    2005-01-01

    The focus of this conference was on the development of the oil sands industry, with specific reference to issues concerning supply and infrastructure. Energy source development and transmission issues were discussed, as well as transportation systems. The impact of increased oil sands development on pipelines was also examined. Various fuel options were discussed, including the use of hydrogen, natural gas and alternate fuels in manufacturing and processing plants. Economic drivers and the creation of new markets were examined, and various export opportunities were reviewed. The environmental impact of increased oil sands activity was discussed, with specific reference to the Boreal regions. Management challenges in the oil sands industry were also discussed along with issues concerning human resources, labour supply, training and education. The conference featured 15 presentations, of which 13 have been catalogued separately for inclusion in this database. refs., tabs., figs

  19. Investigation of potential fire-related damage to safety-related equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Wanless, J.

    1985-11-01

    Based on a review of vendor information, fire damage reports, equipment qualification and hydrogen burn test results, and material properties, thirty-three types of equipment found in nuclear power plants were ranked in terms of their potential sensitivity to fire environments. The ranking considered both the functional requirements and damage proneness of each component. A further review of the seven top-ranked components was performed, considering the relative prevalence and potential safety significance of each. From this, relays and hand switches dominate as first choices for fire damage testing with logic equipment, power supplies, transmitters, and motor control centers as future candidates

  20. The Design and Implementation of Test System Based on Programmable Excitation Power Supply for Mining Comprehensive Protector

    Directory of Open Access Journals (Sweden)

    Zhi-jie Zhang

    2013-11-01

    Full Text Available As comprehensive protectors for coal mining (referred to comprehensive protectors in use are prone to fail, it can timely screen out the invalid comprehensive protector by periodic functional test when it is used (it is called test in use to ensure the production safety. The test in use needs the specialized test equipment, which is not used in delivery inspection by the manufacturers of comprehensive protectors. Thus, testing excitation power becomes a constraint for the improvement of the accuracy of test in use and the degree of automation. To solve the problem, this paper developed a power frequency programmed input-output testing excitation power supply, and on that basis it also realized the mining comprehensive protector test system in use with the excitation circuit and voltage program-controlled output.

  1. Code of practice for the safe use of industrial radiography equipment (1989)

    International Nuclear Information System (INIS)

    1989-12-01

    This code supersedes the Code of practice for the control and safe handling of sealed radioactive sources used in industrial radiography, published by the National Health and Medical Research Council (NHMRC) in 1968. It differs significantly from the former code because radiation protection practice and recommended standards have changed. The code covers the design, construction and requirements for the safe use of X-radiography equipment and gamma-radiography equipment. It provides illustrative working rules, detailed emergency procedures and comprehensive responsibilities and duties for all personnel involved in supplying and using industrial radiography equipment. The code details those equipment requirements, personnel requirements and work practices that the NHMRC considers necessary to keep exposures to ionizing radiation as low as reasonably achievable. Some equipment and facilities currently in use may not meet all of the mandatory requirements of this code. These requirements have been included in the code to encourage progress towards future compliance in the expectation that, in the interim, statutory authorities will apply them with discretion

  2. Sales Rebate Contracts in Fashion Supply Chains

    Directory of Open Access Journals (Sweden)

    Chun-Hung Chiu

    2012-01-01

    Full Text Available We explore in this paper the performance of sales rebate contracts in fashion supply chains. We conduct both analytical and numerical analyses via a mean-variance framework with reference to real empirical data. To be specific, we evaluate the expected profits and variance of profits (risk of the fashion supply chains, fashion retailers, and manufacturers under (1 the currently implemented sales rebate practices, (2 the case without sales rebate, and (3 the theoretical coordination situation (if target sales rebate is adopted. In addition, we analyze how sales effort affects the performances of the supply chain and its agents. Our analysis indicates that the rebate contracts may hurt the retailer and the manufacturer of a fashion supply chain when it is inappropriately set. Moreover, a properly designed sales rebate contract not only can coordinate the supply chain (with retail sales effort but can also improve expected profits and lower the levels of risk for both the manufacturer and the retailer.

  3. Improved control rod drive handling equipment for BWRs [boiling-water reactors]: Final report

    International Nuclear Information System (INIS)

    Turner, A.P.L.; Gorman, J.A.

    1987-08-01

    Improved equipment for removing and replacing control rod drives (CRDs) in BWR plants has been designed, built and tested. Control rod drives must be removed from the reactor periodically for servicing. Removal and replacement of CRDs using equipment originally supplied with the plant has long been recognized as one of the more difficult and highest radiation exposure maintenance operations that must be performed at BWR plants. The improved equipment was used for the first time at Quad Cities, Unit 2, during a Fall 1986 outage. The trial of the equipment was highly successful, and it was shown that the new equipment significantly improves CRD handling operations. The new equipment significantly simplifies the sequence of operations required to lower a CRD from its housing, upend it to a horizontal orientation, and transport it out of the reactor containment. All operations of the new equipment are performed from the undervessel equipment handling platform, thus, eliminating the requirement for a person to work on the lower level of the undervessel gallery which is often highly contaminated. Typically, one less person is required to operate the equipment than were used with the older equipment. The new equipment incorporates a number of redundant and fail safe features that improve operations and reduce the chances for accidents

  4. Treatment options for tank farms long-length contaminated equipment

    International Nuclear Information System (INIS)

    Josephson, W.S.

    1995-01-01

    This study evaluated a variety of treatment and disposal technologies for mixed waste (MW) meeting the following criteria: 1. Single-Shell and Double-Shell Tank System (tank farms) equipment and other debris; 2. length greater than 12 feet; and contaminated with listed MW from the tank farms. This waste stream, commonly referred to as tank farms long-length contaminated equipment (LLCE), poses a unique and costly set of challenges during all phases of the waste management lifecycle

  5. Use of operator-provided, installed C/S equipment in IAEA safeguards

    International Nuclear Information System (INIS)

    Shea, T.; Rundquist, D.; Gaertner, K.; Yellin, E.

    1987-01-01

    Developing solutions for complex safe guards problems in close cooperation with Operators is becoming more common, especially as the IAEA continues to operate under zero-growth limitations. This has in practice taken on various forms; from the extreme case of very specific equipment developed and constructed by the State/Operator for use in only one facility, to the more normal case where only the development is carried out by the State/Operator. This practice has advantages and disadvantages. For example, to ensure that Agency inspections will be carried out in a predictable manner, it will be in the Operator's interest to ensure that any equipment he provides is of the highest quality, meets all national safety requirements, and is installed and maintained in such a manner that it will provide years of service. Agency equipment performs its intended function in a reliable manner, but with very specific, limited applications in mind, improvements in reliability over that obtained with normal Agency equipment are to be expected. Also, the authors experience is that reaching acceptable arrangements for the use of State- of Operator-supplied equipment is often far more straightforward than when arranging to apply Agency equipment

  6. Experience in testing and inspection and maintenance of material handling equipments

    International Nuclear Information System (INIS)

    Sharma, M.L.

    2009-01-01

    All the Industries, Power Projects/Stations, Organizations engaged in the field of process of manufacturing, power generation, transportation, design, layout, manufacturing, and supply have to utilize material handling equipment, machinery tools tackles, lifting gears for performing their tasks/activities. The major role of the material handling equipments play an important role and a component of 40% of the total activities of the system/process to achieve targeted output with the reliability and quality is performed by material handling equipment and machineries. The material handling equipment shall have to be chosen/selected to suit the process requirement at times to be specifically designed inspected and tested to meet the specific requirement. These equipment/machineries/lifting gears have to undergo for the periodical inspection and testing to qualify for further use in a specified period. All those equipment and machinery to be used for material handling if not found satisfactory during inspection and testing or otherwise also shall be dismantled/stripped to the extent of inspection requirement of the components/sub components and maintenance repair shall have to be done to make them worthy for reuse after testing and inspection duly witnessed by competent authority

  7. Equipment for the measurement of non-electrical parameters

    International Nuclear Information System (INIS)

    Lewin, M.I.; Ewtuchow, A.N.

    1977-01-01

    The invention concerns equipment for the measurement of non-electrical parameters, which can be used in data processing and control equipment. The transducer converts non-electrical parameters into electrical signals. The process according to the invention is explained using the example of an inductive transducer, which is fed with alternating current. The measured parameter affects the mutual inductance of the transducer, so that the secondary voltage supplied by it is a function of the measured parameter. Amplitude measurement of this voltage by means of rectification and filtering has the disadvantage of long time constants, where the measuring period would amount to 6 to 10 cycles of the supply voltage. According to the invention the secondary voltage of the transducer is connected to an integrator during a half-cycle between two zeros, which charges a capacitor to a voltage proportional to the amplitude. An analogue-digital converter now produces a digital signal corresponding to the capacitor voltage, which is taken to the control equipment. This conversion occurs during a fraction of the second half-cycle, so that there is still time before the end of this half-cycle, so that there is still time before the end of this half-cycle to discharge the capacitor and to reproduce the initial conditions. In the next cycle the whole process is repeated, so that the measuring process only takes one cycle. In order to make the digital signal independent of the amplitude of the current fed in, this also flows through an identical transducer with constant mutual inductance, and affects the analogue-digital converter via a comparative circuit. (ORU) [de

  8. Reliability analysis of the automatic control and power supply of reactor equipment

    International Nuclear Information System (INIS)

    Monori, Pal; Nagy, J.A.; Meszaros, Zoltan; Konkoly, Laszlo; Szabo, Antal; Nagy, Laszlo

    1988-01-01

    Based on reliability analysis the shortcomings of nuclear facilities are discovered. Fault tree types constructed for the technology of automatic control and for power supply serve as input data of the ORCHARD 2 computer code. In order to charaterize the reliability of the system, availability, failure rates and time intervals between failures are calculated. The results of the reliability analysis of the feedwater system of the Paks Nuclear Power Plant showed that the system consisted of elements of similar reliabilities. (V.N.) 8 figs.; 3 tabs

  9. FUEL SUPPLY IN ACCUMULATOR DIESEL SYSTEMS WITH ELECTRONIC CONTROL AT STARTING REGIME

    Directory of Open Access Journals (Sweden)

    G. M. Kuharenok

    2009-01-01

    Full Text Available The paper contains review and analysis of fuel supply process in accumulator diesel systems with electronic control at starting regime. The necessity has been shown to  develop and use programs of mathematic simulation pertaining to fuel supply processes with the purpose to decrease number of bench tests and time period required for a fuel system adaptation. The paper cites results of practical investigations on starting engines  equipped with the mentioned-above systems.

  10. Extent of reference services to users in Ebonyi State Public Libraary ...

    African Journals Online (AJOL)

    Users are very satisfied with the extent of reference services provided to them by the public library studied. Findings further show that the reference section of Ebonyi State Public Library, Abakiliki is faced with the problems of inadequate reading space, equipment and furniture, reference information sources, unconducive ...

  11. Lists A and B of X-ray equipment. As of July 1, 1984

    International Nuclear Information System (INIS)

    1984-01-01

    The lists A and B of X-ray equipment present the guidelines for X-ray device, as of December 10, 1983, that are defined in the guidelines for radiology and nuclear medicine of the Federal Association of Panel Doctors. In list A, the equipment categories of up-to-date, commercially available X-ray device are given, whereas list B classifies older equipment, both types available from manufacturers who are members of the ZVEI association. Since the categories of application II and III have been made, specifiying the equipment still in use and applicable within a given transitional period in existing medical establishments, but which may not be applied in new establishments. The list of manufacturers gives the addresses of the firms supplying the equipment described in Lists A and B, which have been compiled according to the requirements set by the Federal Association of Panel Doctors. (orig.) [de

  12. Supply disruption cost for power network planning

    International Nuclear Information System (INIS)

    Kjoelle, G.H.

    1992-09-01

    A description is given of the method of approach to calculate the total annual socio-economic cost of power supply disruption and non-supplied energy, included the utilities' cost for planning. The total socio-economic supply disruption cost is the sum of the customers' disruption cost and the utilities' cost for failure and disruption. The mean weighted disruption cost for Norway for one hour disruption is NOK 19 per kWh. The customers' annual disruption cost is calculated with basis in the specific disruption cost referred to heavy load (January) and dimensioning maximum loads. The loads are reduced by factors taking into account the time variations of the failure frequency, duration, the loads and the disruption cost. 6 refs

  13. Electricity supplies in a French nuclear power station

    International Nuclear Information System (INIS)

    2011-01-01

    As the operation of a nuclear power station requires a power supply system enabling this operation as well as the installation safety, this document describes how such systems are designed in the different French nuclear power stations to meet the requirements during a normal operation (when the station produces electricity) or when it is stopped, but also to ensure power supply to equipment ensuring safety functions during an incident or an accident occurring on the installation. More precisely, these safety functions are provided by two independent systems in the French nuclear power stations. Their operation is briefly described. Two different types of nuclear reactors are addressed: pressurised water reactors (PWR) of second generation, EPR (or PWR of third generation)

  14. Revenue in reverse? An examination of reverse supply chain enabled revenue streams

    DEFF Research Database (Denmark)

    Larsen, Samuel; Jacobsen, Peter

    2016-01-01

    When original equipment manufacturers (OEMs) examine whether to implement a reverse supply chain (RSC) for their products, oftentimes the motive is cost savings or regulatory compliance. However, a frequently overlooked but equally important benefit is the possibility for creating new revenue...

  15. Seismic qualification method of equipment for nuclear power plant

    International Nuclear Information System (INIS)

    Kim, J.S.; Choi, T.H.; Sulaimana, R.A.

    1995-01-01

    Safety related equipment installed in Korean Nuclear Power Plants are required to perform a safety function during and after a seismic event. To accomplish this safety function, they must be seismically qualified in accordance with the intent and requirements of the USNRC Reg. Guide 1.100 Rev. 02 and IEEE Std. 344-1987. This paper defines and summarizes acceptable criteria and procedures, based on the Korean experience, for seismic qualification of purchased equipment to be installed in a nuclear power plant. As such the paper is intended to be a concise reference by equipment designers, architectural engineering company and plant owners in uniform implementation of commitments to nuclear regulatory agencies such as the USNRC or Korea Institute of Nuclear Safety (KINS) relating to adequacy of seismic Category 1 equipment. Thus, the paper provides the methodologies which can be used for qualifying equipment for safely related service in Nuclear Power Plants in a cost effective manner

  16. Increasing the reliability of electricity supply of industrial enterprises for the account of application of a quick-running redundant power supply

    Directory of Open Access Journals (Sweden)

    Vertugin A.A.

    2017-06-01

    Full Text Available One of the main tasks to be performed when organizing the operation of the energy system is to ensure high-quality and uninterrupted power supply to consumers. Dips, interruptions and voltage surges of the electrical network are the most common causes of malfunctions in industrial plants and damage to household equipment, causing significant economic damage to both consumers and electricity suppliers.

  17. Voltage balancing in modular energy storage of power supply for micro resistance welding

    Directory of Open Access Journals (Sweden)

    Kozhushko Yu. V.

    2017-10-01

    Full Text Available Micro resistance welding is one of the most effective ways to obtain permanent joints of metal parts. The quality of welded joints strongly depends on the characteristics of the power supply of welding equipment. The power supplies for micro resistance welding based on Energy Storage topology have a softer impact on the network than the ones based on Direct Energy topology. The use of supercapacitors for Energy Storage type power supplies makes it possible to reduce the dimensions of welding equipment and to improve its technical parameters. However, the feature of the supercapacitors is low value of the nominal voltage, which usually does not exceed 3 V. To provide higher voltage, the modules of supercapacitors connected in series are designed. In order to extend the life time of such modules, a voltage balancing system is required. A circuit for balancing the voltage of a modular supercapacitor energy storage of a power supply for micro resistance welding is proposed. The fragments of calculation of control units of a supercapacitor module cell are given. The simulation of the balancing circuit operation is carried out and time charts of the supercapacitor charge process are obtained. The operability and effectiveness of the proposed solution is confirmed. The advantage of the proposed circuit is the possibility of obtaining the high efficiency because of returning the excessive energy of the module cell back into the power supply.

  18. Concerning some problems of heavy equipment maintenance in the Maritsa-Iztok Combine

    Energy Technology Data Exchange (ETDEWEB)

    Khristov, B

    1979-09-01

    Discusses low quality of repairs on mining equipment which causes extensive periods of idleness. The central service base at Radnevo not only lacks capacity to do repairs on heavy excavating equipment but is also poorly equipped with mobile cranes and service trucks to keep up adequate maintenance activity at working sites. Limited supply of spare parts is partly due to decreasing imports and partly to the lack of production facilities at the central service base. Undue delays are also caused by a lack of access roads, for example, the Troyanovo 1 mine cannot be reached by road even during the summer season. There are constant fluctuations of technical personnel and the number of specialists remaining past their first contract period is decreasing. Integration of all maintenance and repair operations, establishment of advanced training facilities and more economic use of equipment is recommended. (In Bulgarian)

  19. 41 CFR 101-26.507-3 - Purchase of security equipment from Federal Supply Schedules.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Purchase of security... Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.507-3 Purchase of...

  20. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  1. Managing the Service Supply Chain in the Department of Defense: Opportunities and Challenges

    National Research Council Canada - National Science Library

    Apte, Uday; Ferrer, Geraldo; Lewis, Ira; Rendon, Rene

    2006-01-01

    ...% of total DoD procurement dollars) on services. In recent years, the DoD has spent more on services than on supplies, equipment and goods, even considering the high value of weapon systems and large military items...

  2. The Complex Economic System of Supply Chain Financing

    Science.gov (United States)

    Zhang, Lili; Yan, Guangle

    Supply Chain Financing (SCF) refers to a series of innovative and complicated financial services based on supply chain. The SCF set-up is a complex system, where the supply chain management and Small and Medium Enterprises (SMEs) financing services interpenetrate systematically. This paper establishes the organization structure of SCF System, and presents two financing models respectively, with or without the participation of the third-party logistic provider (3PL). Using Information Economics and Game Theory, the interrelationship among diverse economic sectors is analyzed, and the economic mechanism of development and existent for SCF system is demonstrated. New thoughts and approaches to solve SMEs financing problem are given.

  3. Collection effort and reverse channel choices in a closed-loop supply chain

    DEFF Research Database (Denmark)

    Govindan, Kannan; Liu, Liwen; Wang, Zongjun

    2017-01-01

    We investigate the pricing and reverse channel choice decision issues in a closed-loop supply chain, within which the original equipment manufacturer (OEM) sells the new and remanufactured products through a retailer, while collects used products (cores) via dual recycling channels. We consider...

  4. Introduction to deaerator in auxiliary water supply system of nuclear power plant

    International Nuclear Information System (INIS)

    Dong Jianguo; Zhou Xia; Lei Yongxia

    2015-01-01

    The paper introduces the operation theory and thermal calculation and verification requirements for the deaerator in the auxiliary water supply system of nuclear power plant. In addition, it describes the key factors in terms of function, structure, design and fabrication of equipment. (authors)

  5. Sustainable Power Supply Solutions for Off-Grid Base Stations

    Directory of Open Access Journals (Sweden)

    Asma Mohamad Aris

    2015-09-01

    Full Text Available The telecommunication sector plays a significant role in shaping the global economy and the way people share information and knowledge. At present, the telecommunication sector is liable for its energy consumption and the amount of emissions it emits in the environment. In the context of off-grid telecommunication applications, off-grid base stations (BSs are commonly used due to their ability to provide radio coverage over a wide geographic area. However, in the past, the off-grid BSs usually relied on emission-intensive power supply solutions such as diesel generators. In this review paper, various types of solutions (including, in particular, the sustainable solutions for powering BSs are discussed. The key aspects in designing an ideal power supply solution are reviewed, and these mainly include the pre-feasibility study and the thermal management of BSs, which comprise heating and cooling of the BS shelter/cabinets and BS electronic equipment and power supply components. The sizing and optimization approaches used to design the BSs’ power supply systems as well as the operational and control strategies adopted to manage the power supply systems are also reviewed in this paper.

  6. 2009 reference case scenario : Canadian energy demand and supply to 2020 : an energy market assessment

    International Nuclear Information System (INIS)

    2009-01-01

    The National Energy Board regulates the construction and operation of interprovincial and international oil and gas pipelines and power lines as well as the tolls and tariffs for the pipelines under its jurisdictions. The import and export of natural gas is also regulated by the NEB. The NEB examined the possible energy futures that might unfold for Canadians up to the year 2020. The factors that affect the supply of crude oil, natural gas, liquefied natural gas, electricity and coal in the short term were examined to determine the outlook for deliverability through 2020. The growing demand for energy was reviewed along with the adequacy of future energy supplies, and related issues of emerging technologies, energy infrastructure and energy exports. This assessment provided separate production outlooks for hydrocarbons, electricity and coal and outlined the key uncertainties to the supply outlook. The likely impact of recent economic, energy and policy trends on energy demand and supply were considered. It was concluded that energy markets in Canada will continue to function well. Energy prices will provide appropriate market signals for the development of energy resources to meet Canadian and export demand. A significant portion of Canadian demand for energy will be met by fossil fuels. However, the demand to move towards greener energy fuels should result in fewer greenhouse gas emissions. 1 tab., 27 figs.

  7. 46 CFR 160.047-1 - Incorporation by reference.

    Science.gov (United States)

    2010-10-01

    ...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Kapok or Fibrous Glass, Adult... reference to the following documents: (1) Federal Specification: L-P-375C—Plastic Film, Flexible, Vinyl...

  8. Registration document 2005; Document de reference 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This reference document of Gaz de France provides information and data on the Group activities in 2005: financial informations, business, activities, equipments factories and real estate, trade, capital, organization charts, employment, contracts and research programs. (A.L.B.)

  9. Dynamic joint investments in supply chains under information asymmetry

    OpenAIRE

    Agrell, Per Joakim; Kasperzec, Roman

    2010-01-01

    Supply chain management involves the selection, coordination and motivation of independently operated suppliers. However the central planner's perspective in operations management translates poorly to vertically separated chains, where suppliers may have rational myopic reasons to object to full in- formation sharing and centralized decision rights. Particular problems occur when a downstream coordinator demands relation-specific investments (equipment, cost improvements in processes, adaptat...

  10. Equipment Obsolescence Analysis and Management Software

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.; Carret, L.; Shaon, S.; Schultz, C.

    2015-07-01

    The procurement engineering resources at Nuclear Power Plants (NPPs) are experiencing increasing backlog for procurement items primarily due to the inability to order the original replacement parts. The level of effort and time required to prepare procurement packages is increasing since the number of obsolete parts are increasing exponentially. Procurement packages for obsolete components and parts are much more complex and take more time to prepare because of the need to perform equivalency evaluations, testing requirements and test acceptance criteria development, commercial grade dedication or equipment qualification, and increasing efforts to verify that no fraudulent or counterfeit parts are procured. This problem will be further compounded when NPPs pursue license renewal and approval for plant-life extension. Advanced planning and advanced knowledge of equipment obsolescence is required to allow for sufficient time to properly procure replacement parts for obsolete items. The uncertain supply chain capability due to obsolescence is a real problem and can cause a risk to reliable plant operations due to the potential for a lack of available spare parts and replacement components to support outages and unplanned component failures. Advanced notification of obsolescence is increasingly more important to ensure that adequate time and planning is scheduled to procure the proper replacement parts. A thorough analysis of Original Equipment Manufacturer (OEM) availability and inventory as well as an analysis of failure rates and usage rates is required to predict critical part needs to allow for early identification of obsolescence issues so that a planned and controlled strategy to qualify replacement equipment can be implemented. (Author)

  11. Supply Chain Contracts in Fashion Department Stores: Coordination and Risk Analysis

    Directory of Open Access Journals (Sweden)

    Bin Shen

    2014-01-01

    Full Text Available In the fashion industry, department stores normally trade with suppliers of national brands by markdown contract whilst developing private labels with cooperated designers by profit sharing contract. Motivated by this real industrial practice, we study a single-supplier single-retailer two-echelon fashion supply chain selling a short-life fashion product of either a national brand or a private label. The supplier refers to the national/designer brand owner and the retailer refers to the department store. We investigate the supply chain coordination issue and examine the supply chain agents’ performances under the mentioned two contracts. We find the analytical evidence that there is a similar relative risk performance but different absolute risk performances between the national brand and the private label. This finding provides an important implication in strategic interaction for the risk-averse department stores in product assortment and brand management. Furthermore, we explore the impact of sales effort on the supply chain system and find that the supply chain is able to achieve coordination if and only if the supplier (i.e., the national brand or the private label is willing to share the cost of the sales effort.

  12. Magnet power supply system for the ISABELLE half-cell prototype

    International Nuclear Information System (INIS)

    Nawrocky, R.J.

    1977-01-01

    Due to stringent requirements on the spatial harmonic content of ISABELLE's magnetic field, the magnet power supplies for the half-cell prototype must be dynamically accurate and stable to within 0.01% of their full-scale rating. Depending on the application, the full-scale current of various units comprising the system ranges from +-50 A to 4000 A. The system, as constructed is fully controllable and programmable either manually or with a control computer. The magnet power supply system described was constructed and interconnected with the half-cell computer control equipment. A number of power supply units were tested with inductive test loads in both the manual and the computer control modes. Test results on stability and speed of response indicate that all systems perform according to specifications

  13. Trilateral Initiative: IAEA authentication and national certification of verification equipment for facilities with classified forms of fissile material

    International Nuclear Information System (INIS)

    Haas, Eckard; Sukhanov, Alexander; Murphy, John

    2001-01-01

    Full text: Within the framework of the Trilateral Initiative, technical challenges have arisen due to the potential of the International Atomic Energy Agency (IAEA) monitoring fissile material with classified characteristics, as well as the IAEA using facility or host country supplied monitoring equipment. In monitoring material with classified characteristics, it is recognized that the host country needs to assure that classified information is not made available to the IAEA inspectors. Thus, any monitoring equipment used to monitor material with classified characteristics has to contain information security capabilities, such as information barriers. But likewise in using host-country-supplied monitoring equipment, regarding the material being monitored the IAEA has to have confidence that the information provided by the equipment is genuine and can be used by the IAEA in fulfilling its obligation to derive conclusions based on independent verification measures. Thus the IAEA needs to go through the process of authenticating the monitoring equipment. In the same way the host country needs to go through the process to assure itself that the monitoring equipment integrated with an information barrier will not divulge any classified information about an inspected sensitive item. Both processes require on large extent identical measures, but partially also may conflict with each other. The fact that monitoring equipment needs to exhibit information security throughout its lifecycle while at the same time be capable of being authenticated necessitates the need for creative technical approaches to be pursued. (author)

  14. Remote-automated inspection and maintenance of nuclear power plant equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, Masayoshi; Nakano, Yoshiyuki

    1984-12-01

    Employing remote-control inspection and maintenance equipment in nuclear power plants increases the plant availability by decreasing the annual shutdown time (outage), as well as radiation exposure and man-power. This paper presents an outline of the latest designs for an automatic refueling machine, a control rod drive handling machine, a fuel preparation machine, and a main steam line plug, which were supplied to the Fukushima Dai-Ni No. 2 Plant of the Tokyo Electric Power Co., Inc. (Fukushima 2-2). Also, the up-to-date developments of other new automatic machines, such as a CRD disassembly and cleaning system, spent fuel channel box volume reduction equipment, and robotics for nuclear plant use are presented.

  15. 30 CFR 77.403-2 - Incorporation by reference.

    Science.gov (United States)

    2010-07-01

    ... MINES Safeguards for Mechanical Equipment § 77.403-2 Incorporation by reference. In accordance with 5 U..., Engineering and Research Center, Denver, Colorado. SAE documents are available from the Society of Automotive...

  16. Areva - 2016 Reference document

    International Nuclear Information System (INIS)

    2017-01-01

    Areva supplies high added-value products and services to support the operation of the global nuclear fleet. The company is present throughout the entire nuclear cycle, from uranium mining to used fuel recycling, including nuclear reactor design and operating services. Areva is recognized by utilities around the world for its expertise, its skills in cutting-edge technologies and its dedication to the highest level of safety. Areva's 36,000 employees are helping build tomorrow's energy model: supplying ever safer, cleaner and more economical energy to the greatest number of people. This Reference Document contains information on Areva's objectives, prospects and development strategies. It contains estimates of the markets, market shares and competitive position of Areva

  17. Code of practice for the safe use of industrial radiography equipment (1989)

    International Nuclear Information System (INIS)

    1989-12-01

    This code supersedes the Code of Practice for the control and safe handling of sealed radioactive sources use din industrial radiography, published by the National Health and Medical Research Council (NHMRC) in 1968. It differs significantly from the former code because radiation protection practice and recommended standards have changed. The code covers the design, construction and requirements for the safe use of X-radiography equipment and gamma-radiography equipment. It provides illustrative working rules, detailed emergency procedures and comprehensive responsibilities and duties for all personnel involved in supplying and using industrial radiography equipment. The code details those equipment requirements, personnel requirements and work practices that the NHMRC considers necessary to keep exposures to ionizing radiation as low as reasonably achievable. Some equipment and facilities currently in use may not meet all of the mandatory requirements of this code. These requirements have been included in the code to encourage progress towards future compliance in the expectation that, in the interim, statutory authorities will apply them with discretion. 9 refs., tabs., ills

  18. EDF group - Reference Document 2009

    International Nuclear Information System (INIS)

    2010-01-01

    The EDF group is an integrated energy company with a presence in a wide range of electricity-related businesses: generation, transmission, distribution, supply and energy trading. It is France's leading electricity operator and has a strong position in the three other main European markets (Germany, the United Kingdom and Italy), making it one of Europe's leading electrical players as well as a recognized player in the gas industry. With worldwide installed power capacity totaling 136.3 GW as of December 31, 2009 (134.0 GW in Europe) and global energy generation of 618.5 TWh, it has the largest generating capacity of all the major European energy corporations with the lowest level of CO 2 emissions due to the significant proportion of nuclear and hydroelectric power in its generation mix. The EDF group supplies gas, electricity, and associated services to more than 37.9 million customer accounts worldwide (including approximately 27.7 million in France). The EDF group's businesses reflect its adoption of a model aimed at finding the best balance between French and international activities, competitive and regulated operations and based on an upstream-downstream integration. In 2009, the Group's consolidated revenues were euros 66.3 billion, the net income (Group share) was euros 3.9 billion, and earnings before interest, tax, depreciation and amortization was euros 17.5 billion. This document is EDF Group's Reference Document and Annual Financial Report for the year 2009. It contains information about: the Group activities, risk factors, Business, Organizational structure, Property plant and equipment, Operating and financial review, Capital resources and cash flows, Research and Development, Patents and Licenses, Information on trends, Financial outlook, Administrative, management, and supervisory bodies and senior management, Compensation and benefits, Functioning of the administration and management bodies, Employees/Human resources

  19. Study of National Electric System equipment until 2000 year

    International Nuclear Information System (INIS)

    1980-01-01

    The report by the German firm Lahmeyer International is about the historical development of the supply of Electric Power, description of the current system, previous studies, organization, power plants, hydroelectric plants and existing construction, transmission system, hydrological studies and water resources, operation of hydro thermal generation, medium-term demand, energy sources and generation in the medium term, list of thermal plants, evaluation of alternative equipment plans in Uruguay at a med dium term.

  20. Supply Chain and Blade Manufacturing Considerations in the Global Wind Industry (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    James, Ted [National Renewable Energy Lab. (NREL), Golden, CO (United States); Goodrich, Alan [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-12-12

    This briefing provides an overview of supply chain developments in the global wind industry and a detailed assessment of blade manufacturing considerations for U.S. end-markets. The report discusses the international trade flows of wind power equipment, blade manufacturing and logistical costs, and qualitative issues that often influence factory location decisions. To help guide policy and research and development strategy decisions, this report offers a comprehensive perspective of both quantitative and qualitative factors that affect selected supply chain developments in the growing wind power industry.

  1. Implementing OLAP Technology to Leverage Value of Supply Chain Management System

    OpenAIRE

    Ekananta, Ekananta

    2008-01-01

    Supply chain refers to the flow of materials, information, money, and services from rawmaterial suppliers, through factories and warehouses, to the end users. The successful of company inthe business competition is highly depend on how well the company capability to optimize andmanage their supply chain process. ERP is an information technology solution that play the mainrole in the supply chain management with the aim to plan, organize, and optimize one or more of thesupply chain’s activitie...

  2. Engineering Design of the ITER AC/DC Power Supplies

    International Nuclear Information System (INIS)

    Oh, B. H.; Lee, K. W.; Hwang, C. K.; Jin, J. T.; Chang, D. S.; Kim, T. S.

    2009-02-01

    To design high power pulse power supplies, especially in huge power supplies have not designed till now, it is necessary to analyze a system's characteristics and relations with another systems as well as to know high voltage, high current control technologies. Contents of this project are; - Study for the engineering designs changed recently by ITER Organization(IO) and writing specifications for the power supplies to reduce project risk. - Detailed analysis of the AC/DC Converters and writing subtask reports on the Task Agreement. - Study for thyristor numbers, DCR's specifications for Korea-China sharing meetings. - Study for the grounding systems of the ITER power supply system. The results may used as one of reference for practical designs of the high power coil power supplies and also may used in various field such as electroplating, plasma arc furnaces, electric furnaces

  3. Safety of nursing staff and determinants of adherence to personal protective equipment.

    Science.gov (United States)

    Neves, Heliny Carneiro Cunha; Souza, Adenícia Custódia Silva e; Medeiros, Marcelo; Munari, Denize Bouttelet; Ribeiro, Luana Cássia Miranda; Tipple, Anaclara Ferreira Veiga

    2011-01-01

    A qualitative study conducted in a teaching hospital with 15 nursing professionals. Attempted to analyze the reasons, attitudes and beliefs of nursing staff regarding adherence to personal protective equipment. Data were collected through focus groups, analyzed by the method of interpretation of meanings, considering Rosenstock's model of health beliefs as a reference framework. Data revealed two themes: Occupational safety and Interpersonal Relationship. We identified several barriers that interfere in matters of safety and personal protective equipment, such as communication, work overload, physical structure, accessibility of protective equipment and organizational and management aspects. Adherence to personal protective equipment is determined by the context experienced in the workplace, as well as by individual values and beliefs, but the decision to use the personal protective equipment is individual.

  4. Auxiliary equipment cooling circuit in nuclear reactors

    International Nuclear Information System (INIS)

    Yanagisawa, Ko.

    1986-01-01

    Purpose: To prevent the propagation of bacterias that transform NO 2 into NO 3 in auxiliary equipment coolants using corrosion inhibitors of nitrite type in BWR type reactors. Method: In auxiliary equipments coolant systems, water quality is controlled by using purified water as supplement water and nitrite such as Na 2 NO 2 as the corrosion inhibitors. However, in the circumstance where dissolved oxygen is present, bacteria propagate to oxidize NO 2 into NO 3 . Thus, NO 2 at 200 ppm is reduced to 20 ppm. In view of the above, a surge tank supplied from water supplement line is connected in series and a deaeration device is disposed thereto. Since the presence of dissolved oxygen causes the bacteria to propagate it is desired that the dissolved oxygen density in the supplement water is less than 5 ppm. Deaeration and pressure reduction in the surge tank can remove the dissolved oxygen, prevent NO 3 increase and also prevent stress corrosion cracks in the system pipeways. (Horiuchi, T.)

  5. Importance of a 99Mo/99mTc generator and a perspective of nuclear medicine in the face of the difficult situation of supply shortage of 99mTc from the view-point of a nuclear medicine specialist

    International Nuclear Information System (INIS)

    Kosuda, Shigeru

    2010-01-01

    In this review a list of commercially available 99m Tc-labeled radiopharmaceuticals was presented, and the significance to use them clinically was described in the face of this difficult situation due to the 99m Tc shortage. The supply history and the chronological change in the sales of 99 Mo/ 99m Tc generators in Japan were also described. I emphasize the importance of a nationwide spread of dedicated single photon emission computed tomography (SPECT)/CT equipments, which provide not only a simultaneous acquisition of dual tracers, but also information on both function and morphology. The present issues to address this difficult situation were discussed, referring to the summary of the Organization for Economic Co-operation and Development (OECD)/the Nuclear Energy Agency (NEA) workshop held in Paris and the press conference at the 56 th Society of Nuclear Medicine (SNM) annual meeting held in Toronto. The results of a questionnaire survey conducted in Saitama prefecture suggested the procedures, such as a domestic self-supply of 99 Mo, to resolve the issues related to the shortage. In addition, the ongoing Japan Materials Testing Reactor (JMTR) project regarding self-supply of 99 Mo was described. Based on a reliable supply of 99m Tc, the following suggestions to develop nuclear medicine were presented from the viewpoint of a nuclear medicine specialist; development of a brand-new SPECT/CT equipment using semi-conductor, clinical application of new tracers, and reassessment of the existing SPECT studies. (author)

  6. Environmental Retail Supply Chains

    DEFF Research Database (Denmark)

    Kotzab, Herbert; Munch, Hilde; de Faultrier, Birgitte

    2011-01-01

    which were grouped into eight categories; they refer to “fundamental environmental attitude”, “use of energy”, “use of input material”, “product”, “packaging”, “transport”, “consumption” and “waste”. The level of environmental supply chain management can be characterised as very operational and very...... short-term oriented (green operations). Long-term oriented green design initiatives were hardly observed. Furthermore, the specific environmental activities of three retailers from Denmark, France and the UK were compared. Research limitations/implications – The empirical study investigates supply chain...... operations of retailers and excludes other areas of retail management. The results are based on material that is published by the respective companies and thus do not include internal reports. Originality/value – The main contribution of this paper is to test the proposition that global retailers follow...

  7. Reference data about petroleum fiscality

    International Nuclear Information System (INIS)

    2006-01-01

    This paper explains the different taxes existing in France for the petroleum products (domestic tax on petroleum products, added-value tax), the share of taxes in the retail price, the differences with other European countries, the French Government fiscal receipts and budget. Some information forms are attached to this document and concern: the formation of fuel prices (upstream, refining and transport-distribution margins), the evolution of annual average transport-distribution margins, some reference data about world petroleum markets (supply and demand, prices, market data), and some reference data about the role of oil companies on the petroleum market. (J.S.)

  8. Method and procedure of fatigue analysis for nuclear equipment

    International Nuclear Information System (INIS)

    Wen Jing; Fang Yonggang; Lu Yan; Zhang Yue; Sun Zaozhan; Zou Mingzhong

    2014-01-01

    As an example, the fatigue analysis for the upper head of the pressurizer in one NPP was carried out by using ANSYS, a finite element method analysis software. According to RCC-M code, only two kinds of typical transients of temperature and pressure were considered in the fatigue analysis. Meanwhile, the influence of earthquake was taken into account. The method and procedure of fatigue analysis for nuclear safety equipment were described in detail. This paper provides a reference for fatigue analysis and assessment of nuclear safety grade equipment and pipe. (authors)

  9. Acceptance test procedure for the master equipment list (MEL)database system -- phase I

    International Nuclear Information System (INIS)

    Jech, J.B.

    1997-01-01

    The Waste Remediation System/.../Facilities Configuration Management Integration group has requested development of a system to help resolve many of the difficulties associated with management of master equipment list information. This project has been identified as Master Equipment List (MEL) database system. Further definition is contained in the system requirements specification (SRS), reference 7

  10. EDF group - Reference Document 2005

    International Nuclear Information System (INIS)

    2006-01-01

    The EDF Group is an integrated energy supplier operating in a wide range of electricity-related businesses: generation, transmission, distribution, sale and trading of energy. It is the main operator in the French electricity market and one of the leading electricity groups in Europe. With an installed capacity of 130.8 GW (123.9 GW in Europe), it contributes to the supply of energy and services to more than 40 million customers throughout the world (with approximately 36.7 million customers in Europe, more than 28 million of whom are in France). The EDF Group has built a business model balanced between deregulated and regulated operations in France and an international presence. In 2005, the Group recorded consolidated sales of euros 51,051 million, net income (Group share) of euros 3,242 million, and it achieved earnings before interests, taxes, depreciation and amortization of euros 13,010 million. This document is EDF Group's Reference Document for the year 2005. It contains information about: the Group activities, risk factors, Business Overview, Organizational Structure, Property, Plants and Equipment, Operating and Financial Review, Capital Resources, Research and Development, Patents and Licences, Trend Information, Financial Prospects, Administrative, Management, and Supervisory Bodies and Senior Management, Remuneration and Benefits, Board Practices, Employees/Human Resources, Major Shareholders, Related Party Transactions, Financial Information Concerning the Company's Assets and Liabilities, Financial Position and Profits and Losses, Material Contracts, Information on Holdings etc

  11. Energy Cost Optimization in a Water Supply System Case Study

    Directory of Open Access Journals (Sweden)

    Daniel F. Moreira

    2013-01-01

    Full Text Available The majority of the life cycle costs (LCC of a pump are related to the energy spent in pumping, with the rest being related to the purchase and maintenance of the equipment. Any optimizations in the energy efficiency of the pumps result in a considerable reduction of the total operational cost. The Fátima water supply system in Portugal was analyzed in order to minimize its operational energy costs. Different pump characteristic curves were analyzed and modeled in order to achieve the most efficient operation point. To determine the best daily pumping operational scheduling pattern, genetic algorithm (GA optimization embedded in the modeling software was considered in contrast with a manual override (MO approach. The main goal was to determine which pumps and what daily scheduling allowed the best economical solution. At the end of the analysis it was possible to reduce the original daily energy costs by 43.7%. This was achieved by introducing more appropriate pumps and by intelligent programming of their operation. Given the heuristic nature of GAs, different approaches were employed and the most common errors were pinpointed, whereby this investigation can be used as a reference for similar future developments.

  12. A safety equipment list for rotary mode core sampling systems operation in single shell flammable gas tanks

    International Nuclear Information System (INIS)

    SMALLEY, J.L.

    1999-01-01

    This document identifies all interim safety equipment to be used for rotary mode core sampling of single-shell flammable gas tanks utilizing Rotary Mode Core Sampling systems (RMCS). This document provides the safety equipment for RMCS trucks HO-68K-4600, HO-68K-4647, trucks three and four respectively, and associated equipment. It is not intended to replace or supersede WHC-SD-WM-SEL-023, (Kelly 1991), or WHC-SD-WM-SEL-032, (Corbett 1994), which classifies 80-68K-4344 and HO-68K-4345 respectively. The term ''safety equipment'' refers to safety class (SC) and safety significant (SS) equipment, where equipment refers to structures, systems and components (SSC's). The identification of safety equipment in this document is based on the credited design safety features and analysis contained in the Authorization Basis (AB) for rotary mode core sampling operations in single-shell flammable gas tanks. This is an interim safety classification since the AB is interim. This document will be updated to reflect the final RMCS equipment safety classification designations upon completion of a final AB which will be implemented with the release of the Final Safety Analysis Report (FSAR)

  13. High harmonic distortion in a new building due to a multitude of electronic equipment

    NARCIS (Netherlands)

    Timens, R.B.; Buesink, Frederik Johannes Karel; Cuk, V.; Cobben, J.F.G.; Kling, W.L.; Leferink, Frank Bernardus Johannes

    2011-01-01

    In modern buildings virtually all electric loads are non-linear. Neither the applicable standards for supply of electrical energy nor those for consumption of electrical energy take into account the replacement of linear loads by non-linear loads. Low power equipment is exempted in standards

  14. The equipment supply industry to sugar mills, ethanol and energy in Brazil: an analysis based in leading companies and key-organizations of sector and of LPA of Sertãozinho

    Directory of Open Access Journals (Sweden)

    Michelle Castro Carrijo

    2015-12-01

    Full Text Available This study aims to analyze the profile, organization, efficiency and innovation in the supply industry equipment for sugar mills, ethanol and energy in Brazil, contributing to an important discussion on the competitiveness of this industry. Therefore, the study was based on analysis of information obtained from two surveys: the first held with representative organizations and two industry-leading companies located in the cities of Sertãozinho and Piracicaba; and the second, through interviews with companies in the Local Productive Arrangement (LPA of Sertãozinho, known as the Silicon Valley Ethanol. The results suggest that the increasing modernization of the sector will require greater efforts from equipment industry to provide plants with the necessary technological innovations and potential efficiency gains and that the constituent companies of this industry, few invest in technology and professional training, in other words, are lacking in management training, which leads to loss of valuable opportunities, international market share is tiny, most companies turn to private sources of financing, and companies seem unaware of the real benefits of cooperation, although they appear in most companies in this industry.

  15. Prime Contract Awards by Service Category and Federal Supply Classification, Fiscal Years 1980, 1981, 1982, 1983.

    Science.gov (United States)

    1983-01-01

    GYMNASTIC EQUIPMENT 1,773 2 e94 3,938 2 49P TOTAL 4,552 5,038 8 292 5 278 79 CLEANING EQUIPMENT AND SUPPLIES 7910 FLOOR POLISHERS AND VACUUM CLEANERS 1,188...8020 PAINT AND ARTISTS BRUSHES 10 67 11 0 8030 PRESERVATIVE AND SEALING COMPOUNDS 851 8.340 2.169 1.183 8040 ADHESIVES 272 447 839 278 TOTAL 7.288 18,248

  16. Will implementation of green gas into the gas supply be feasible in the future?

    OpenAIRE

    Bekkering, J.; Gemert, van, Wim; Broekhuis, A.A.; Hengeveld, E.J.

    2015-01-01

    energy efficiency, greenhouse gas reduction and cost price of a green gas supply chain were evaluated. This supply chain is based on co-digestion of dairy cattle manure and maize, biogas upgrading and injection into a distribution gas grid. A defined reference scenario reflects the current state of practice, assuming that input energy is from fossil origin. Possible improvements of this reference scenario were investigated. For this analysis two new definitions for energy input-output ratio w...

  17. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  18. Oak Ridge Isotope Products and Services - Current and Expected Supply and Demand

    International Nuclear Information System (INIS)

    Aaron, W.S.; Alexander, C.W.; Cline, R.L.; Collins, E.D.; Klein, J.A.; Knauer, J.B. Jr.; Mirzadeh, S.

    1999-01-01

    Oak Ridge National Laboratory (ORNL) has been a major center of isotope production research, development, and distribution for over 50 years. Currently, the major isotope production activities include (1) the production of transuranium element radioisotopes, including 252 Cf; (2) the production of medical and industrial radioisotopes; (3) maintenance and expansion of the capabilities for production of enriched stable isotopes; and, (4) preparation of a wide range of custom-order chemical and physical forms of isotope products, particularly in accelerator physics research. The recent supply of and demand for isotope products and services in these areas, research and development (R ampersand D), and the capabilities for future supply are described in more detail below. The keys to continuing the supply of these important products and services are the maintenance, improvement, and potential expansion of specialized facilities, including (1) the High Flux Isotope Reactor (HFIR), (2) the Radiochemical Engineering Development Center (REDC) and Radiochemical Development Laboratory (RDL) hot cell facilities, (3) the electromagnetic calutron mass separators and the plasma separation process equipment for isotope enrichment, and (4) the Isotope Research Materials Laboratory (IRML) equipment for preparation of specialized chemical and physical forms of isotope products. The status and plans for these ORNL isotope production facilities are also described below

  19. Quality tracing in meat supply chains.

    Science.gov (United States)

    Mack, Miriam; Dittmer, Patrick; Veigt, Marius; Kus, Mehmet; Nehmiz, Ulfert; Kreyenschmidt, Judith

    2014-06-13

    The aim of this study was the development of a quality tracing model for vacuum-packed lamb that is applicable in different meat supply chains. Based on the development of relevant sensory parameters, the predictive model was developed by combining a linear primary model and the Arrhenius model as the secondary model. Then a process analysis was conducted to define general requirements for the implementation of the temperature-based model into a meat supply chain. The required hardware and software for continuous temperature monitoring were developed in order to use the model under practical conditions. Further on a decision support tool was elaborated in order to use the model as an effective tool in combination with the temperature monitoring equipment for the improvement of quality and storage management within the meat logistics network. Over the long term, this overall procedure will support the reduction of food waste and will improve the resources efficiency of food production.

  20. A Service-Oriented E-Commerce Reference Architecture

    OpenAIRE

    Aulkemeier, Fabian; Schramm, Milan; Iacob, Maria Eugenia; van Hillegersberg, Jos

    2016-01-01

    Electronic commerce (e-commerce) is getting more and more important in people's every day shopping routines. Vendors who want to establish an online channel besides their traditional retail practice have to integrate the two supply chains. The underlying information technology systems should be able to support the integration of the new and old processes. While reference models are a popular means in designing this type of systems, the existing reference models in the field of e-commerce only...

  1. Present situation and necessity of computer programmed X-ray equipment

    International Nuclear Information System (INIS)

    Shiraishi, Junji; Hatagawa, Masakatsu

    1989-01-01

    In order to take radiographic photos, it is necessary to know a great deal of information. For example, mA, kV, exposure time, screen, grid, phototimer, etc. In this study, we examined 4 widely-used types computer-programmed X-ray equipment. These computer-assisted processes are designed to look at the data and make programmed individual decisions. The purpose is to reduce the differences in radiographic quality and the risk of retaking caused by the differences in experience among technicians. We concluded that none of them has ideal functions but each can be used as a source supply information, if a little remodeling is done, and we confirm that computer-programmed X-ray equipment is, and will continue to go be, necessary. (author)

  2. Increasing the reliability of electric energy supply to consumers in ROMAG-PROD Heavy Water Plant

    International Nuclear Information System (INIS)

    Barta, Ioan; Hanes, Marian . E-mail electrica@romag.ro

    2004-01-01

    Full text: This work aims at achieving an analysis of time evolution of the status of electrical installations, their performances and reliability, at describing the refurbishment measures adopted, at assessing the efficiency of these measures and also to suggest solutions for improving the reliability in the electric energy supply of ROMAG-PROD Heavy Water Plant. The analysis started from the original design, the manner the electrical installations were mounted, the technological level of this equipment and gives an evaluation of the deficiencies and the evolution of incidents occurred during the operation period. On the basis of the experience gathered one advances new items for equipment renewing and refurbishment of electric installations which together with the existing ones would ensure an electric energy supply more secure and efficient, leading directly to a more safe and efficient operation of the ROMAG-PROD Heavy Water Plant. In this work the incidents of electric energy nature which occurred are analyzed, the equipment which generated events identified and measures to solve these problems proposed

  3. Design and development of power supplies at VECC for accelerators

    International Nuclear Information System (INIS)

    Thakur, S.K.

    2013-01-01

    Several power supplies have been designed and developed in-house incorporating various topologies to match the load requirements. Most of the power supplies have been being utilised in K-130 and K-500 cyclotrons operation successfully from last several years. Amongst other types, Switching Mode PS (SMPS), Phase Controlled Rectifier (PCR), Linear mode power supply are mostly in use, irrespective of their own merits and demerits. Switching mode power supply (SMPS) is most common topology for various applications ranging from high current to high voltage applications. Due to low stored energy and faster response, the SMPS incorporating Pulse Switch Modulation (PSM) configuration is most suitable for high voltage DC power supply at larger power compared to its counterparts, makes possible to operate the power system without crowbar. For an IOT cathode power supply, a 200kW at - 40kV High voltage power supply is under development incorporating SMPS and PSM technique. Earlier, High Voltage power supply was made by using Tetrode Tube in linear mode for RF amplifier for K-130 Cyclotron. Later, in K-500 Cyclotron, a High Voltage power supply was developed incorporating PCR topology rated at 20kV, 20 Amp for Anodes for 3 nos. of RF amplifiers. These HV power supply is equipped with ultra-fast acting Crowbar Protection System developed in VECC which is for the protection of costly RF Tubes against the internal arc. Design and development of SMPS based Bipolar Power Supply with 4-Quadrant operation rated at ± 27 V, ± 300 Amp with current stability around 100 ppm for Super-conducting Magnets along with quench protection and energy dumping scheme. (author)

  4. Tracking reliability for space cabin-borne equipment in development by Crow model.

    Science.gov (United States)

    Chen, J D; Jiao, S J; Sun, H L

    2001-12-01

    Objective. To study and track the reliability growth of manned spaceflight cabin-borne equipment in the course of its development. Method. A new technique of reliability growth estimation and prediction, which is composed of the Crow model and test data conversion (TDC) method was used. Result. The estimation and prediction value of the reliability growth conformed to its expectations. Conclusion. The method could dynamically estimate and predict the reliability of the equipment by making full use of various test information in the course of its development. It offered not only a possibility of tracking the equipment reliability growth, but also the reference for quality control in manned spaceflight cabin-borne equipment design and development process.

  5. In short supply

    Energy Technology Data Exchange (ETDEWEB)

    Lotocki, C.; Marshall, M. [Hutchinson Tyres (Australia)

    2006-02-15

    The paper proposes a means by which to alleviate current tyre shortages. Hutchinson Industries manufactures a rubber linear insert that is re-usable (referred to as an RL) which is able to save tyres on industrial and mining equipment from premature death. The RL carries the load; the tyre holds the RL within the casing. RL inserts were successfully fitted to a Joy S10SC32 at BHP Dendrobium coal mine. The tyre in use was a Michelin 14.00 R 24 XKA and a tyre on this shuttle car had suffered a large sidewall injury. 4 figs.

  6. An ultra low-power off-line APDM-based switchmode power supply with very high conversion efficiency

    DEFF Research Database (Denmark)

    Nielsen, Nils

    2001-01-01

    This article describes the results from the research work on design of a ultra low power off-line power supply with very high conversion efficiency. The input voltage is 230 VAC nominal and output voltage is 5 VDC. By ultra low power levels, an output power level in the area ranging from 50 m......W and up to 1000 mW is meant. The small power supply is intended for use as a standby power supply in mains operated equipment, which requires a small amount of power in standby mode....

  7. Managing the Service Supply Chain in Department of Defense: Implications for the Program Management Infrastructure

    National Research Council Canada - National Science Library

    Rendon, Rene G; Apte, Uday

    2007-01-01

    .... In fact, in recent years, the DoD has spent more on services than on supplies, equipment and goods, even considering the high value of weapon systems and large military items (Camm, Blickstein & Venzor, 2004...

  8. Coal mining equipment

    International Nuclear Information System (INIS)

    Stein, R.R.; Martin, T.W.

    1991-01-01

    The word in longwall components is big, and these larger components have price tags to match. The logic behind the greater investment is that it will yield high production rates and good uptime statistics. This is true in most cases. More important than single-shift tonnage records, average shift production continues to climb upwards. This paper reports on the quality, and more significantly, the quantity of service supplied for long-wall equipment, which has reached levels that would have been seen as unachievable when longwall mining was first introduced in the U.S. The school of thought then was that longwall would increase productivity in part by reducing the number of production units and thus reducing the number of personnel employed underground. The expectation of fewer employees turned out to be unrealistic. That was probably one reason that some early attempts to install longwall system looked more like failures than vision of the future

  9. Voltage surges induced in transformer secondaries with loads characterized by sensitive electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Cogo, Joao Roberto [GSI Engenharia e Consultoria Ltda., Taubate, SP (Brazil)], Email: gsi@gsiconsultoria.com.br; Dommel, Hermann Wilhelm [University of British Columbia, Vancouver (Canada)], Email: hermannd@ece.ubc.ca

    2007-07-01

    The grounding of sensitive electronic equipment such as computers, programmable logic controllers (PLC), process control systems, and other electronic equipment is one of the most important considerations towards obtaining an efficient operation of such systems. Such equipment, which for the purposes of this work is called 'Sensitive Electronic Equipment - SEE' is very sensitive to faults and low intensity random voltages which have no effect upon the electrical power equipment and upon human beings. In this work, the grounding problem is evaluated, to guide the user on the proper installation of SEEs, so as to prevent them from being damaged. The following items will be discussed: voltages which SEEs are subject to during incidence of atmospheric surges in the distribution overhead lines to which they are connected; sustained voltage that the high voltage supply of SEEs must be able to withstand during line-to-ground faults that originate from atmospheric surges that reach the transmission lines which are connected to the electrical power self producers (or electrical power independent producers). (author)

  10. Communication equipment radiation resistance ensurance

    International Nuclear Information System (INIS)

    Myrova, L.O.; Chelizhenko, A.Z.

    1983-01-01

    A review of works on radiation resistance of electronic equipment (epsilon epsilon) for 15 years is presented. The effect of ionizing radiation appearing as a result of nuclear explosions in nuclear facilities and in outerspace on epsilon epsilon has been considered. Types of radiation effects in epsilon epsilon, radiation effect on semiconductor devices and integrated circUits, types of epsilon epsilon failures, as well as the procass of radiation-resistant epsilon epsilon designing and selection of its main parameters have been described. The methods of epsilon epsilon flowsheet optimization, application of mathematical simulation and peculiarities of ensurance of epsilon epsilon radiation resistance of communication systems are considered. Peculiarities of designing of radiation-resistant quartz generators, secondary power supply sources and amplifiers are discussed

  11. DIII-D power supply, design, and development

    International Nuclear Information System (INIS)

    Nerem, A.

    1995-02-01

    An overview of the DIII-D power supply system with information details concerning the configuration, power ratings, acquisition costs, and cost scaling relevant to the design of ITER and other tokamaks is presented. The power supplies for the DIII-D tokamak were installed and commissioned during the late 1970's and the beginning of the 1980's. Several upgrades have been implemented during the last two years to solve increasing reliability problems encountered as the equipment aged, to provide enhanced operational flexibilities, and to enable operation at the higher power levels needed to provide experimental data relevant to the ITER and TPX design activities. These upgrades ranged from redesign of the power supply control systems to the replacement of vacuum circuit breakers which had become unreliable in service. A new interlock and protection system has also been implemented using the latest programmable logic controllers (PLC) and computer technology. These upgrades have been highly successful and are described to provide insight to many issues in the specification of high power converters. Power supply models used in the design of the DIII-D Plasma Control System are also described along with model verification test data. These models are being used in the development of a new advanced plasma control system for the DIII-D tokamak. Recent operational experience and results are presented

  12. Implementing OLAP Technology to Leverage Value of Supply Chain Management System

    Directory of Open Access Journals (Sweden)

    Ekananta Ekananta

    2012-01-01

    Full Text Available Supply chain refers to the flow of materials, information, money, and services from rawmaterial suppliers, through factories and warehouses, to the end users. The successful of company inthe business competition is highly depend on how well the company capability to optimize andmanage their supply chain process. ERP is an information technology solution that play the mainrole in the supply chain management with the aim to plan, organize, and optimize one or more of thesupply chain’s activities which is concentrate on supply chain efficiency.The recent development of Supply Chain Performance Management (SCPM Application, theOLAP based information technology solutions, will help supply chain managers to be more effectivein managing supply chain activities due to its capability to provide the planning and controllingfunction to achieve a better operation performance.This paper will describe the role of OLAP technology to leverage value of supply chainmanagement system by complement the ERP functions and also provide the descriptions of thetechnology framework and development methodology for Supply Chain Performance Management(SCPM Application.Keywords: Supply Chain Management, OLAP, Performance Management

  13. Foundations of Logistics and Supply Chain Research

    DEFF Research Database (Denmark)

    Georgi, Christoph; Darkow, Inga-Lena; Kotzab, Herbert

    2013-01-01

    The purpose of this paper is to explore the current intellectual foundation of four leading academic journals within the field of logistics and supply chain management. We were interested to identify the most frequently quoted publications as well as their impact on logistics research. We examined...... 17,000 references of 412 papers and further analysed the 39 top-references with the means of multidimensional scaling (MDS), cluster- and factor analysis. We were able to identify a mix of textbooks and articles from academic journals and revealed a journal-specific citation pattern, not only...

  14. An autonomous nuclear power plant with integrated nuclear steam supply system designed for electric power and heat supply in remote areas with difficult access

    International Nuclear Information System (INIS)

    Adamovich, L.A.; Grechko, G.I.; Lapin, B.D.; Ulasevich, V.K.; Shishkin, V.A.

    1997-01-01

    The paper contains basic conceptual principles used to develop the technical assignment for an autonomous nuclear power plant with integrated nuclear steam supply system (NSSS) designed to provide heat and electricity for areas which are remote with difficult access. The paper also describes technical procedures and equipment, NPP thermal hydraulic flow chart, steam generator design, safety aspects as well as operational and maintenance procedures. (author)

  15. Design/CPN. A Reference Manual

    DEFF Research Database (Denmark)

    Jensen et. al, Kurt

    /CPN WWW pages. To speed up the access to the Design/CPN manuals we recommend to keep a local copy - which may be shared by all users in your organisation. In this way you do not need to go via our WWW server each time you need to look in a manual. For some of the largest manuals, we also supply files......Note: The manuals are available as PDF files . There are two sets of manuals - one for the Unix platform and another for the Mac platform. Each set of manual consists of: Tutorial (for the Design/CPN editor and simulator) Reference Manual (for the Design/CPN editor and simulator) Programmer......'s Manual (with Design/OA functions and Charts) Occurrence Graph Manual (integrated tutorial and reference manual) OE/OS Graph Manual (integrated tutorial and reference manual) Other Manuals (e.g. a short overview of CPN ML).   The Tutorial, Reference Manual and Programmer's Manual are made for Design...

  16. Nitrogen gas supply device in nuclear power plant

    International Nuclear Information System (INIS)

    Nishino, Masami

    1991-01-01

    The present invention concerns a nitrogen gas supply device in a nuclear power plant for supplying nitrogen gases to a reactor container and equipments working with the nitrogen gas as the load. A liquid nitrogen storage pool is disposed to a concrete nuclear buildings and has a two-vessel structure of inner and outer vessels, in which heat insulators are disposed between the inner and the outer vessels. Further, the nitrogen gas supply mechanism is disposed in an evaporation chamber disposed in adjacent with the liquid nitrogen storage pool in the reator building. Accordingly, since liquid nitrogen is stored in the liquid nitrogen storage pool having a structure surrounded by concrete walls, direct sunlight is completely interrupted, thereby enabling to prevent the heat caused by the direct sunlight from conducting to the liquid nitrogen. Further, since the outer vessel is not exposed to the surrounding atmosphere, heat conduction rate relative to the external air is small. This can reduce the amount of liquid nitrogen released to the atmospheric air due to natural evaporation. (I.N.)

  17. Effectiveness of the credit-line approach for support of CD4 equipment functionality in northern Uganda

    Directory of Open Access Journals (Sweden)

    Michael L. Kasusse

    2015-11-01

    Full Text Available Background: Improving laboratory service delivery requires a functioning logistics and supply system. Uganda’s Ministry of Health uses the credit-line approach to provide laboratory supplies including commodities for CD4 test equipment. Objectives: We examined the effectiveness of the credit-line approach in improving laboratoryservice delivery by using the functionality of CD4 test equipment as a proxy indicator. Method: A cross-sectional survey was conducted at 7 level-three health centres (HC IIIs, 18 level-four health centres (HC IVs, and 10 hospitals in 15 districts of mid-northern Uganda, including the Lango (17 facilities and Acholi sub-regions (18 facilities, between July 2013 and August 2013. Functionality, was determined through self- and interviewer-administered questionnaires. The chi-squared test was used to assess differences in functionality by subregion, facility type, and equipment type. Results: A total of 38 CD4 test analysers were assessed. Of these, 26 (68% were functional. In hospitals, 85% of CD4 analysers were functional, in HC IVs, 67% were functional and in HCIIIs, 43% were functional. The differences did not reach statistical significance. In the Langosub-region, 72% of analysers were functional; in the Acholi sub-region, 65% were functional. Non-functionality was mainly due to lack of reagents and cartridges, as well as low staffing levels of laboratory technicians with the skills necessary to operate the equipment. Conclusion: The credit-line approach supported the functionality of CD4 equipment in the surveyed facilities. However, there is a need to address issues of staffing and availability of reagents to enhance the functionality of CD4 equipment and improve patient care, especiallyat HC IIIs.

  18. Distributed Supply Coordination for Power-to-Gas Facilities Embedded in Energy Grids

    NARCIS (Netherlands)

    Alkano, Desti; Scherpen, Jacquelien M. A.

    This paper considers hydrogen and renewable electricity from power-to-gas (PtG) facilities supplied to a gas grid, a mobility sector, and a power grid. The PtG facilities are equipped with hydrogen buffers and fuel cells. The goal is to maximize the expected profit of PtG facilities without

  19. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  20. A safety equipment list for rotary mode core sampling systems operation in single shell flammable gas tanks; TOPICAL

    International Nuclear Information System (INIS)

    SMALLEY, J.L.

    1999-01-01

    This document identifies all interim safety equipment to be used for rotary mode core sampling of single-shell flammable gas tanks utilizing Rotary Mode Core Sampling systems (RMCS). This document provides the safety equipment for RMCS trucks HO-68K-4600, HO-68K-4647, trucks three and four respectively, and associated equipment. It is not intended to replace or supersede WHC-SD-WM-SEL-023, (Kelly 1991), or WHC-SD-WM-SEL-032, (Corbett 1994), which classifies 80-68K-4344 and HO-68K-4345 respectively. The term ''safety equipment'' refers to safety class (SC) and safety significant (SS) equipment, where equipment refers to structures, systems and components (SSC's). The identification of safety equipment in this document is based on the credited design safety features and analysis contained in the Authorization Basis (AB) for rotary mode core sampling operations in single-shell flammable gas tanks. This is an interim safety classification since the AB is interim. This document will be updated to reflect the final RMCS equipment safety classification designations upon completion of a final AB which will be implemented with the release of the Final Safety Analysis Report (FSAR)

  1. A Model of Intelligent Fault Diagnosis of Power Equipment Based on CBR

    Directory of Open Access Journals (Sweden)

    Gang Ma

    2015-01-01

    Full Text Available Nowadays the demand of power supply reliability has been strongly increased as the development within power industry grows rapidly. Nevertheless such large demand requires substantial power grid to sustain. Therefore power equipment’s running and testing data which contains vast information underpins online monitoring and fault diagnosis to finally achieve state maintenance. In this paper, an intelligent fault diagnosis model for power equipment based on case-based reasoning (IFDCBR will be proposed. The model intends to discover the potential rules of equipment fault by data mining. The intelligent model constructs a condition case base of equipment by analyzing the following four categories of data: online recording data, history data, basic test data, and environmental data. SVM regression analysis was also applied in mining the case base so as to further establish the equipment condition fingerprint. The running data of equipment can be diagnosed by such condition fingerprint to detect whether there is a fault or not. Finally, this paper verifies the intelligent model and three-ratio method based on a set of practical data. The resulting research demonstrates that this intelligent model is more effective and accurate in fault diagnosis.

  2. A reference architecture for IoT-based logistic information systems in agrifood supply chains

    NARCIS (Netherlands)

    Verdouw, C.N.; Robbemond, R.M.; Verwaart, T.; Wolfert, J.; Beulens, A.J.M.

    2015-01-01

    Logistics in the food and agribusiness industry must address perishable products, unpredictable supply variations and stringent food safety and sustainability requirements. The Internet of Things (IoT) could contribute significantly to solve these challenges because it allows for remotely

  3. Domestic manufacturing and reliability improvement of reactor water recirculation equipment

    International Nuclear Information System (INIS)

    Kobayashi, Hidekazu; Oi, Masao; Shida, Toichi; Yokomori, Takashi

    1982-01-01

    The reactor coolant recirculation system is one of the important systems to control the reactor output in BWR nuclear power plants. Its components require high reliability and maintainability as well as controllability. For many Japanese nuclear power plants, recirculation pumps, fluid couplings and others have been imported so far. Hitachi Ltd. has established a domestic manufacturing organization through the development and test of these equipment. The fundamental design conditions for these equipment are the improvement of the rate of utilization of plant facility, the capability to follow load, and output power stability. In this paper, the specifications, the investigation of moment of inertia and the design features of recirculation pumps, driving motors and variable frequency power supply systems are described. The paper also reports on the combination test implemented to evaluate the recirculation system. The combination test includes the test using water rheostat for the power source facility and the loading test for a recirculation pump. The application of those system equipment to an actual plant was analyzed and evaluated on a basis of the test data obtained. The result showed that the equipment can achieve the rate of change of reactor power of 30%/min. Those equipment have been employed for No. 2 reactor plant of the Fukushima No. 2 Nuclear Power Station, the Tokyo Electric Power Co., Inc. (Wakatsuki, Y.)

  4. Leading a supply chain turnaround.

    Science.gov (United States)

    Slone, Reuben E

    2004-10-01

    Just five years ago, salespeople at Whirlpool were in the habit of referring to their supply chain organization as the "sales disablers." Now the company excels at getting products to the right place at the right time--while managing to keep inventories low. How did that happen? In this first-person account, Reuben Slone, Whirlpool's vice president of Global Supply Chain, describes how he and his colleagues devised the right supply chain strategy, sold it internally, and implemented it. Slone insisted that the right focal point for the strategy was the satisfaction of consumers at the end of the supply chain. Most supply chain initiatives do the opposite: They start with the realities of a company's manufacturing base and proceed from there. Through a series of interviews with trade customers large and small, his team identified 27 different capabilities that drove industry perceptions of Whirlpool's performance. Knowing it was infeasible to aim for world-class performance across all of them, Slone weighed the costs of excelling at each and found the combination of initiatives that would provide overall competitive advantage. A highly disciplined project management office and broad training in project management were key to keeping work on budget and on benefit. Slone set an intense pace--three "releases" of new capabilities every month--that the group maintains to this day. Lest this seem like a technology story, however, Slone insists it is just as much a "talent renaissance." People are proud today to be part of Whirlpool's supply chain organization, and its new generation of talent will give the company a competitive advantage for years to come.

  5. Recommended practices and guidelines for procurement of magnetic-fusion-energy electrical equipment

    International Nuclear Information System (INIS)

    1982-06-01

    The followng three chapters are included: (1) administrative guidelines, (2) technical practices, and (3) check list. The first two chapters contain detailed information which is to be used as a reference by specification writers in preparing specifications. Chapter 3 is intended to provide a uniform specification format for specification writers, and is further intended to satisfy equipment manufactures' complaints that different specification formats are used to describe essentially identical equipment

  6. Only adding stationary storage to vaccine supply chains may create and worsen transport bottlenecks.

    Science.gov (United States)

    Haidari, Leila A; Connor, Diana L; Wateska, Angela R; Brown, Shawn T; Mueller, Leslie E; Norman, Bryan A; Schmitz, Michelle M; Paul, Proma; Rajgopal, Jayant; Welling, Joel S; Leonard, Jim; Claypool, Erin G; Weng, Yu-Ting; Chen, Sheng-I; Lee, Bruce Y

    2013-01-01

    Although vaccine supply chains in many countries require additional stationary storage and transport capacity to meet current and future needs, international donors tend to donate stationary storage devices far more often than transport equipment. To investigate the impact of only adding stationary storage equipment on the capacity requirements of transport devices and vehicles, we used HERMES (Highly Extensible Resource for Modeling Supply Chains) to construct a discrete event simulation model of the Niger vaccine supply chain. We measured the transport capacity requirement for each mode of transport used in the Niger vaccine cold chain, both before and after adding cold rooms and refrigerators to relieve all stationary storage constraints in the system. With the addition of necessary stationary storage, the average transport capacity requirement increased from 88% to 144% for cold trucks, from 101% to 197% for pickup trucks, and from 366% to 420% for vaccine carriers. Therefore, adding stationary storage alone may worsen or create new transport bottlenecks as more vaccines flow through the system, preventing many vaccines from reaching their target populations. Dynamic modeling can reveal such relationships between stationary storage capacity and transport constraints.

  7. SPEAR3 DC MAGNET POWER SUPPLIES - AN OVERVIEW

    International Nuclear Information System (INIS)

    De Lira, A.

    2004-01-01

    The Stanford Synchrotron Radiation Laboratory (SSRL) has successfully commissioned SPEAR 3, its newly upgraded 3-GeV synchrotron light source. First stored beam occurred December 15, 2003. This paper presents an overview and descriptions of the DC magnet power supplies. These consist of tightly-regulated ((le) 10 ppm) current sources ranging in output from 30 A to 800 A and output power ranging from a few watts to almost 1.0 MW. A total of 226 magnet power supplies are in successful operation. The SPEAR 3 upgrade performance and reliability requirements mandated new power supplies for both the SPEAR 3 storage ring, and for the booster-to-SPEAR 3 (BTS) transport line. A large variety of precise, highly stable current power supplies were needed to fill the diverse magnet needs. Also described are outside procurement aspects, in-house construction, installation, testing, performance and operation of the power supplies. During field testing, special emphasis was made to ensure a critically damped response on the current loop. Frequency spectra measurements were made for reference and future diagnostics

  8. The UK market for dust and particulate removal equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-08-01

    The report has a market overview of dust and particulate removal equipment, 1995-1999 and has specific market reports, by value, of fabric, ceramic and sintered filters, electrostatic precipitators, wet scrubbers (venturi, plate and others) and cyclones. It gives environmental expenditure by UK industry and discusses factors affecting supply, demand and success in the market. An overview is given of the industry structure and profiles are presented of 15 companies. Lists of contracts, trade associations and relevant journals are included. 33 tabs.

  9. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  10. The Integration Role of European Defense Procurement in Achieving a More Competitive and Stronger European Defense Equipment Market

    Science.gov (United States)

    2015-06-01

    and systems, even monopolistic ) essence of the supply side of the defense market . There are only a few suppliers that can meet today’s complex...DEFENSE PROCUREMENT IN ACHIEVING A MORE COMPETITIVE AND STRONGER EUROPEAN DEFENSE EQUIPMENT MARKET by Kiril O. Angelov June 2015 Thesis Advisor...COMPETITIVE AND STRONGER EUROPEAN DEFENSE EQUIPMENT MARKET 5. FUNDING NUMBERS 6. AUTHOR(S) Kiril O. Angelov 7. PERFORMING ORGANIZATION NAME(S) AND

  11. Defence in depth for electric power supplies in Indian nuclear power plants

    International Nuclear Information System (INIS)

    Gupta, S.K.; Srivasista, K.; Solanki, R.B.

    2009-01-01

    The purpose of electric power supply system in a nuclear power plant is to supply and distribute reliable electric power to safety related systems and systems important to safety in various forms, arrangements and combinations of redundancy and diversity in order to perform safety functions required during operational states and design basis events (DBE) such as shutting down the reactor, maintaining the reactor in safe shutdown state, containment isolation and reactor core cooling preventing significant release of radioactive material to the environment. Hence the design basis of electric power supply systems includes identification of DBE that require power supplies, adequacy of redundancy and diversity, environmental conditions to which electric equipment are qualified, identification of loads requiring interrupted and uninterrupted power supplies, time sequence in which emergency loads are to be supplied in case of interruption, provisions for maintaining and testing, consideration for minimum duration capability of emergency power supplies during station blackout etc. Based on operation experience, results of probability safety assessment and certain weaknesses noticed in defence in depth of electric power supply systems, several continuous design improvements have been made in Indian nuclear power plants during operating phase and life extension. Instituting various tests during initial commissioning, subsequent operation and life extension has ensured high standards of performance of electric power supplies. Some of these aspects are highlighted in this paper

  12. Integral Transportation Systems in Military Transport Aircraft Supply

    Directory of Open Access Journals (Sweden)

    Dražen Kovačević

    2012-10-01

    Full Text Available Supply of goods, equipment and soldiers by militwy transportaircraft can serve as a support to airborne landing operation,support to encircled forces, and support to forces leadinga gue1rilla war. Transport aircraft are designed in such a wayas to be able to cany containers, pallets, most of land vehiclesand helicopters. Militwy transport aircraft can be grouped intothose that were originally designed for military transp01t andthose that are modified civilian aircraft and helicopters. Supplypallets can be wooden, metal, can be airdropped in "taxiing","low-flight", and can also be fitted with a parachute or"retrorocket" for reducing the ground impact. Pallets canamong other things carry liquids, heavy combat and ca1rier vehicles,artillery and rocket weapons and valious containers.Pallets are usually pe1manently deformed at ground impact.Nowadays, high precision of airdrop has been achieved. Containersare used to carry various equipment, food, fue~ weapons,ammunition etc. It is to be expected that the containers,wmoured combat and other vehicles will be redesigned so asto provide more efficient transport and fast a!Tangement ofhigh-mobility units, whereas the form of the future militarytransport aircraft will not undergo substantial changes. By adjustingand standardising the transporlation vehicles, integraltransportation means and cwgo, the overall combat efficiencywill be increased, the a~rangement time especially shortenedand the air supply safety increased.

  13. Similarity principles for seismic qualification of equipment by experience data

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1989-01-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data is that available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application and verification of the procedures are given for actual test data available from previous qualifications. The developments are intended to elaborate on the rather broad guidelines by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. The results also contribute to filling a gap that exists between the IEEE 344 methodology and that which was previously developed for equipment in existing plants by the Seismic Qualification Utilities Group. 10 refs., 9 figs., 1 tab

  14. Experience in industrial radiography equipment into carry out inspections in Brazil

    International Nuclear Information System (INIS)

    Lopes, Valdir Maciel; Silva, Joao

    2008-01-01

    The Nuclear and Energy Research Institute (IPEN), in accordance with the attributions given by the National Commission of Nuclear Energy (CNEN), has been supplying the market with radioactive sealed sources of Iridium 192 ( 192 Ir), for Brazil and some South America Countries, for more than 24 years. In this period, the experience acquired in the accompanied of the technological improvement in the industrial gammagraphy equipment; into Sealed Sources Production Laboratory (LPFS) will be show. Of the set of operations carry out in the LPFS, since the assemblies, tests of qualification of the sources also inspection at of the equipment for posterior applications in field, it is intended to demonstrate to the technological improvement associate to the radiological and operational security. In this work, the data base of the system of the LPFS will be used, as well as the professional experience of the laboratory team in the daily relationship with the companies responsible for the equipment operation. (author)

  15. Improving electrical equipment and control systems for shield integrated mining systems

    Energy Technology Data Exchange (ETDEWEB)

    Rabinovich, Z.M.; Starikov, B.Ya.; Kibrik, I.S.

    1984-06-01

    The design and operation are discussed for electrical equipment and control systems for the 1AShchM, the ANShch and the 2ANShch shield integrated face systems consisting of shield supports, coal plow and chain conveyor. The shield system is used for mining inclined and steep coal seams endangered by coal dust explosions, methane or rock bursts. Control and electrical system for 3 types of shield face mining systems is similar. It cuts energy supply when methane content at working faces exceeds the maximum permissible level, controls haulage rate and cutting rate of a coal plow, controls operation of shield supports (using the Sirena system), controls dust suppression system and its water consumption. The system is also equipped with communications equipment. Tests of the control and electrical system for the integrated shield system carried out in the im. Gagarin mine in the Ukraine are described. The VAUS III control system developed by Dongiprouglemash was tested.

  16. Water supply method to the fuel cell cooling water system; Nenryo denchi reikyakusuikei eno kyusui hoho

    Energy Technology Data Exchange (ETDEWEB)

    Urata, T. [Tokyo (Japan); Nishida, S. [Tokyo (Japan)

    1996-12-17

    The conventional fuel cell has long cooling water piping ranging from the fuel cell exit to the steam separator; in addition, the supply water is cooler than the cooling water. When the amount of supply water increases, the temperature of the cooling water is lowered, and the pressure fluctuation in the steam separator becomes larger. This invention relates to the water supply method of opening the supply water valve and supplying water from the supply water system to the cooling water system in accordance with the signal of the level sensor of the steam separator, wherein opening and closing of the supply valve are repeated during water supply. According to the method the pressure drop in every water supply becomes negligibly small; therefore, the pressure fluctuation of the cooling water system can be made small. The interval of the supply water valve from opening to closing is preferably from 3 seconds to 2 minutes. The method is effective when equipment for recovering heat from the cooling water is installed in the downstream pipeline of the fuel cell. 2 figs.

  17. Project for export system construction of nuclear equipment to IAEA; survey on current market status of the nuclear related international organizations and the domestic possible suppliers

    Energy Technology Data Exchange (ETDEWEB)

    Min, T S; Cho, H K; Kim, H J [Korea Atomic Industrial Forum, Seoul (Korea)

    2001-05-01

    Republic of Korea are keeping the dynamic activities in IAEA as the 8th advanced nuclear country over the world but has occupied very low late less than 0.01% in supplying the equipments to IAEA. About 6,000 nuclear equipment suppliers are registered in IAEA Supply Roster over the world but only 3 Suppliers of our country are registered in IAEA Supply Roster. The supply of nuclear industrial products equivalent to about 100 million dollars into IAEA market will endorse not only the international authorization for our technology and products but also give contribution to activate the domestic nuclear industries in order to increase its expert. The explanation for IAEA procurement market to the 53 nuclear companies will be made on May 16, 2001, and the participants for the export of their goods will be selected. And then we will do all possible supports by the government and related organizations for them to register in IAEA Supply Roster. 21 refs. (Author)

  18. Probabilistic estimates of US uranium supply

    International Nuclear Information System (INIS)

    Piepel, G.F.; Long, L.W.; McLaren, R.A.; Ford, C.E.

    1981-02-01

    This report develops and presents probabilistic estimates of total US uranium supply. The word supply is used in the broad sense that both uranium quantity and cost are of interest. Cost implies minimum acceptable selling price rather than market price. Specifically, four types of probability distributions are developed: (1) quantity of US uranium; (2) cost of US uranium; (3) quantity of US uranium available at or below a certain cost; and (4) cost of US uranium given a certain consumption. In this report, uranium refers to recoverable U 3 O 8 (endowment adjusted for mining recovery and milling losses) occurring in both reserve and potential deposits meeting minimum size requirements with minimum grade above 0.01%. Cost includes operating and capital costs, taxes, profit, and cost capital. This definition of cost is often used to better denote this meaning. This definition of cost is contrasted with forward costs, that exclude sunk costs, taxes, and return on investment. Consumption refers to uranium that has been used from the current time to any point in the future. Uranium quantity and consumption are expressed in short tons, while full recovery costs are stated in constant 1980 dollars per pound

  19. Impact of Foreign Direct Investment and Barriers to MNC Supply Chain Integration in Vietnam

    Directory of Open Access Journals (Sweden)

    Bilici Hamdi

    2017-04-01

    Full Text Available The Vietnamese economy has been progressing to become a supplier to many multinational corporations (MNC. However, barriers presently exist that prevent Vietnamese firms from fully integrating into the supply chain of these global actors. Weak FDI overflow and block trading has government officials and business executives troubled that Vietnamese firms are still on the periphery of these global supply networks. Even as MNCs operating in Vietnam import many semi-finished products from other countries, Vietnamese firms are not benefiting from the opportunities to incorporate into the supply chain because of the lack of global experience, FDI, an educated workforce and outdated facilities. Vietnamese firms must upgrade their facilities and equip their labor forces to acquire MNC contracts and find global partners who can supply financing and knowhow.

  20. The seismic assessment of wheeled vehicle type equipment (e.g. emergency power supply vehicle) against severe accident for nuclear power plant in Japan

    International Nuclear Information System (INIS)

    Ikeda, Takuya; Mitsuzawa, Daisuke; Yamaguchi, Yoshikazu; Hasebe, Motohiko; Imamura, Ryutaro; Tomitani, Yuji; Ueyama, Ippei; Kawamoto, Takahiro

    2017-01-01

    After the events at the Fukushima Dai-ichi Nuclear Power Plant, the equipment to mitigate the effects of severe accidents has been installed in the domestic nuclear power plants. From the viewpoint of convenience for installation, etc., a number of industry standard-based wheeled vehicle type equipment has been placed. On the other hand, the new regulations require the equipment for severe accidents to withstand the Design Basis Earthquake. Therefore, the seismic qualification is essential item for wheeled vehicle type equipment according to the regulatory requirement. At that time, compared to the traditional safety-related equipment, there was not enough knowledge of seismic evaluation for vehicle type equipment. This paper reports the overview of wheeled vehicle type equipment and the seismic qualification by test. (author)

  1. How to apply academic supply chain management: The case of an international university

    OpenAIRE

    G. Gopalakrishnan

    2015-01-01

    Supply chain management concepts and models are not just confined to improving business operations in the manufacturing sector. They can also be developed and applied in the service industry by focusing on the service based supply chain. This paper will explore the application of academic supply chain management at an educational institution namely, RMIT University Vietnam. This paper will first identify the upstream and downstream activities at RMIT University Vietnam with reference to the I...

  2. Competitive and Cooperative Degree in Supply Chain: Supplier Selection between Competitors and Third-Party Suppliers

    OpenAIRE

    Xie, Bo; Wang, Xianjia; Zhou, Chuan

    2014-01-01

    Part 5: Modelling and Simulation; International audience; This work explores the firm’s supplier selection question that the competitor firm and the third-party supplier can supply the substitutable component. We consider a supply chain with two competing original equipment manufacturers (OEMs) and two third-party suppliers. The two OEMs produce the competing products which are comprised by two main components. Each OEM only can produce one component in-house and each third-party supplier onl...

  3. Timber resources of New England and New York with reference to pulpwood supplies

    Science.gov (United States)

    V. L. Harper

    1947-01-01

    Pulp and paper is the most important of the wood-using industries of the Northeast. In value of product, value added by manufacture, and number of persons employed, it exceeds any other, but like all the others it is having increasing difficulties in procurement of timber supplies. Many of the pulp and paper mills have reached the stage where they are running out of...

  4. 76 FR 77914 - Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for...

    Science.gov (United States)

    2011-12-15

    ... lifetime. Correlated color temperature (CCT) and color rendering index (CRI) would also be measured as potential means to delineate equipment classes for HID lamps. This notice of proposed rulemaking (NOPR) also... Conditions a. Ambient Conditions i. Ambient Test Temperature ii. Air Speed b. Power Supply Characteristics i...

  5. Future butanes supply/demand

    International Nuclear Information System (INIS)

    Whitley, S.C.

    1992-01-01

    This paper graphically depicts, through in-depth supply/demand analysis, how environmental regulations can be both bad and good for an industry. In the case of n-butane, the Environmental Protection Agency (EPA) summertime gasoline volatility regulations are a culprit - threatening to ultimately destroy refinery demand for the product as a gasoline blendstock. Waiting in the wings are environmental regulations that should eventually prove to be n-butane's savior. The regulations referred to here are the Clean Air Act (CAA) of 1990's mandate for motor fuel oxygenates. The negative impact of gasoline volatility regulations on U.S. n-butane demand and the positive impact that should come from the use of n-butane as a MTBE precursor are covered. Many variables exist which make studying the effects of these environmental regulations very difficult. Over the past three years RPC Group has conducted numerous studies on n-butane supply/demand, as impacted by both EPA gasoline volatility and fuel oxygenate regulations

  6. Sodium cleaning device for nuclear reactor equipments

    International Nuclear Information System (INIS)

    Fujisawa, Morio.

    1985-01-01

    Purpose: To enable sodium cleaning over the entire length of large size equipments such as control rod drives and primary coolant recycling pumps for use in FBR type reactors. Constitution: A plurality of warm water supply nozzles each having a valve are connected at varying height on the side of a cleaning tank, to which an exhaust line is connected. These nozzles are connected with an exhaust port at the bottom of the tank to constitute a pipeway for cleaning warm water recycling line including a water feed pump and a feedwater heater. The water level in the tank is changed stepwise by successively selecting the warm water feed nozzles. Further, the warm water in the tank is recyclically fed through the nozzles selected at each step of the water level through the recycle line while warming. On the other hand, the pressure inside the tank is reduced through the exhaust line, whereby the warm water in the tank is boiled at low temperature to clean-up sodium on the equipments to be cleaned over the entire length. (Horiuchi, T.)

  7. A reference guide to quality assurance for diagnostic radiography

    International Nuclear Information System (INIS)

    1986-01-01

    The College of Radiographers, through its Professional and Technical Committee, set up a small Working Party to compile a list of references which would help radiographers to become experts at Quality Assurance in Diagnostic Imaging departments. The list is not comprehensive, but includes references which the Working Party have experience of and have found useful. The references provided should aid in the objectives of:- 1. determining acceptable standards of new equipment; 2. making comparisons during use with accepted base line performance; 3. establishing loss of cost effectiveness and the need for replacement. (author)

  8. PV supply chain growing pains

    Energy Technology Data Exchange (ETDEWEB)

    Wilkins, A. [Matrix Energy Inc., Montreal, PQ (Canada)

    2010-11-15

    This article discussed issues involving the supply chain for photovoltaic (PV) equipment that is emerging in Ontario as a result of the Feed-in-Tariff (FIT) program that was launched in late 2009. The rapidly developing PV supply chain may not be taking a sustainable path. The domestic-content requirement is making manufacturers outlay capital to set up manufacturing in Ontario without reliable market data. Only a small number of dealer/installers have any meaningful experience designing and installing grid-tie PV. Until recently, wholesale distributors designed and supplied most grid-tie PV systems in Canada, and solar dealers/installers or electricians or electrical contractors did the installation. Instead of selling directly to dealer/installers, solar manufacturers should develop strong relationships with wholesalers, who have system design experience and product training. This would allow manufacturers to focus on their core strength, reach more customers, and keep lower inventory levels. Wholesale distributors in turn provide dealer/installers with expertise in product and system design, training from a range of manufacturers, marketing and logistics support, and immediate access to inventory. Manufacturers generally lack appropriate accounting, engineering, marketing, and logistics services to deal with a multitude of active accounts, and they are not structured to work with architects and engineers to do complete system design. Partnering with wholesale distributors allows manufacturers to take on the residential and small-scale commercial sectors by building brand awareness and increasing market share and sales across Canada. 2 figs.

  9. PV supply chain growing pains

    International Nuclear Information System (INIS)

    Wilkins, A.

    2010-01-01

    This article discussed issues involving the supply chain for photovoltaic (PV) equipment that is emerging in Ontario as a result of the Feed-in-Tariff (FIT) program that was launched in late 2009. The rapidly developing PV supply chain may not be taking a sustainable path. The domestic-content requirement is making manufacturers outlay capital to set up manufacturing in Ontario without reliable market data. Only a small number of dealer/installers have any meaningful experience designing and installing grid-tie PV. Until recently, wholesale distributors designed and supplied most grid-tie PV systems in Canada, and solar dealers/installers or electricians or electrical contractors did the installation. Instead of selling directly to dealer/installers, solar manufacturers should develop strong relationships with wholesalers, who have system design experience and product training. This would allow manufacturers to focus on their core strength, reach more customers, and keep lower inventory levels. Wholesale distributors in turn provide dealer/installers with expertise in product and system design, training from a range of manufacturers, marketing and logistics support, and immediate access to inventory. Manufacturers generally lack appropriate accounting, engineering, marketing, and logistics services to deal with a multitude of active accounts, and they are not structured to work with architects and engineers to do complete system design. Partnering with wholesale distributors allows manufacturers to take on the residential and small-scale commercial sectors by building brand awareness and increasing market share and sales across Canada. 2 figs.

  10. Estimated dose to in-tank equipment: Phase 1 waste feed delivery

    International Nuclear Information System (INIS)

    Claghorn, R.D.

    1998-01-01

    This analysis estimates the radiation dose to the equipment that will be submerged in double-shell tank waste. The results of this analysis are intended to be the basis for specifications for in-tank equipment. The scope of this analysis is limited to the new equipment required for the delivery of waste feed to Phase 1 private contractors. Phase 1 refers to the first of a two-phase plan to privatize the remediation of Hanford's tank waste. The focus of this analysis is on waste feed delivery because of the extraordinarily high cost of any failure that would lead to the interruption of a steady flow of feed to the private contractors

  11. CEO's guide to world business costs : oil and gas equipment

    International Nuclear Information System (INIS)

    2004-01-01

    This paper presents the results of a detailed study of wellhead equipment manufacturing costs in 11 countries in North America, Europe and Asia-Pacific. According to the Economist Intelligence Unit (EIU), Canada has a 5 per cent cost advantage and will be the best country in the world to do business between 2004 to 2008 because of its foreign trade policies, high quality infrastructure and market opportunities within the North American marketplace. KPMG Consulting developed a web-based cost model that allows investors to examine the costs involved in setting up and operating a business in more than 120 cities in Canada, the United States, the United Kingdom, France, Germany, Italy, Iceland, Luxembourg, the Netherlands, Japan and Australia. According to the model, a comparison of annual costs for oil and gas wellhead equipment manufacturing was presented for the 11 countries with reference to revenues, costs, and profits before and after income tax. In addition, Canada's research and development (R and D) cost advantage compared to the United States was presented, with reference to tax credits, expenditures, salaries, contracts, capital equipment, volume-based tax credits, and research studies. This report also includes a brief summary of 3 oil and gas companies that came to Canada and prospered. tabs., figs

  12. Queuing theory models used for port equipment sizing

    Science.gov (United States)

    Dragu, V.; Dinu, O.; Ruscă, A.; Burciu, Ş.; Roman, E. A.

    2017-08-01

    The significant growth of volumes and distances on road transportation led to the necessity of finding solutions to increase water transportation market share together with the handling and transfer technologies within its terminals. It is widely known that the biggest times are consumed within the transport terminals (loading/unloading/transfer) and so the necessity of constantly developing handling techniques and technologies in concordance with the goods flows size so that the total waiting time of ships within ports is reduced. Port development should be achieved by harmonizing the contradictory interests of port administration and users. Port administrators aim profit increase opposite to users that want savings by increasing consumers’ surplus. The difficulty consists in the fact that the transport demand - supply equilibrium must be realised at costs and goods quantities transiting the port in order to satisfy the interests of both parties involved. This paper presents a port equipment sizing model by using queueing theory so that the sum of costs for ships waiting operations and equipment usage would be minimum. Ship operation within the port is assimilated to a mass service waiting system in which parameters are later used to determine the main costs for ships and port equipment.

  13. Equipment to weld fuel rods of mixed oxides

    International Nuclear Information System (INIS)

    Aparicio, G.; Orlando, O.S.; Olano, V.R.; Toubes, B.; Munoz, C.A.

    1987-01-01

    Two welding outfits system T1G were designed and constructed to weld fuel rods with mixed oxides pellets (uranium and plutonium). One of them is connected to a glove box where the loading of sheaths takes place. The sheaths are driven to the welder through a removable plug pusher in the welding chamber. This equipment was designed to perform welding tests changing the parameters (gas composition and pressure, welding current, electrode position, etc.). The components of the welder, such as plug holder, chamber closure and peripheral accessories, were designed and constructed taking into account the working pressures in the machine, which is placed in a controlled area and connected to a glove box, where special safety conditions are necessary. The equipment to weld fuel bars is complemented by another machine, located in cold area, of the type presently used in the fuel elements factory. This equipment has been designed to perform some welding operations in sheaths and mixed oxide rods of the type Atucha I and II. Both machines have a programmed power supply of wide range and a vacuum, and pressurizing system that allows the change of parameters. Both systems have special features of handling and operation. (Author)

  14. TRACKING TESTS FOR THE SNS FAST INJECTION BUMP POWER SUPPLY

    International Nuclear Information System (INIS)

    ENG, W.; CUTLER, R.; DEWAN, S.

    2004-01-01

    The tracking requirement of the SNS Fast Injection Bump power supplies is described. In addition to the usual tracking between the load current and the input reference of a power supply, these power supplies must also track between pairs of units under slightly different loads. This paper describes the use of a current-null test to measure tracking performances. For the actual tests, a single dummy magnet load was used to measure the tracking between the first two production units at the manufacturer's facility. Using the Yokogawa WE7000 waveform. PC-based measurement instrument, input and output waveforms are digitized and stored in data files. A program written for this application is then used to extract data from these files to construct, analyze the waveforms and characterize the power supply performance. Results of the measurements of two SNS Fast Injection Bump power supplies will be presented in this paper

  15. Will implementation of green gas into the gas supply be feasible in the future?

    NARCIS (Netherlands)

    Bekkering, J.; Hengeveld, E. J.; van Gemert, W. J. T.; Broekhuis, A. A.

    2015-01-01

    The energy efficiency, greenhouse gas reduction and cost price of a green gas supply chain were evaluated. The considered supply chain is based on co-digestion of dairy cattle manure and maize, biogas upgrading and injection into a distribution gas grid. A reference scenario was defined which

  16. 46 CFR 160.005-1 - Incorporation by reference.

    Science.gov (United States)

    2010-10-01

    ...: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Life Preservers, Fibrous Glass, Adult and Child (Jacket Type... makes reference to the following documents: (1) Federal Specification: L-P-375C—Plastic Film, Flexible....005-1: (Sheet 1) Cutting Pattern and General Arrangement (Adult). (Sheet 2) Alternate Stitching of...

  17. Material & equipment, procurement & maintenance: Impact on blood safety.

    Science.gov (United States)

    Emmanuel, Jean C

    2010-01-01

    Blood Transfusion Safety is dependent on effectively organised and managed blood services, which have adequate financial resources, skilled manpower, appropriate infrastructure and quality management systems in place. 80% of the world's population has access to 20% of the supply blood products, of which little is consistently safe. HIV highlighted the importance of blood safety. The lack of effective blood services in low human development index (LHDI), developing countries, has lead to international funding and capacity building for more than three decades. The initial strategies focused on providing HIV testing reagents to prevention transmission, however this only addresses one part of blood safety. Blood safety is not only dependent on preventing HIV transmission. In many populations there are other infectious agents, which have a higher prevalence. Ensuring the correct blood is provided to the patient depends on: well managed services with effective leadership and adequate budgets; capacity building and retention of skilled experienced staff; availability of laboratory equipment, correctly maintained; blood cold chain systems; procedures for tendering, purchasing and ensuring an unbroken supply of reagents and consumables; and quality management systems. Barriers for simplified effective tendering, procurement and contracting require urgent attention and coordination of all funding organisations to ensure an unbroken supply of reagents. Copyright 2009. Published by Elsevier Ltd.

  18. Establishing a Business Process Reference Model for Universities

    KAUST Repository

    Svensson, Carsten

    2012-09-01

    Modern universities are by any standard complex organizations that, from an IT perspective, present a number of unique challenges. This paper will propose establishing a business process reference framework. The benefit to the users would be a better understanding of the system landscape, business process enablement, collection of performance data and systematic reuse of existing community experience and knowledge. For these reasons reference models such as the SCOR (Supply Chain Operations Reference), DCOR (Design Chain Operations Reference) and ITIL (Information Technology Infrastructure Library) have gained popularity among organizations in both the private and public sectors. We speculate that this success can be replicated in a university setting. Furthermore the paper will outline how the research group suggests moving ahead with the research which will lead to a reference model.

  19. Influence of Suspended Equipment on the Carbody Vertical Vibration Behaviour of High-Speed Railway Vehicles

    Directory of Open Access Journals (Sweden)

    Dumitriu Mădălina

    2016-03-01

    Full Text Available The equipment mounted on the carbody chassis of the railway vehicles is a critical component of the vehicle in terms of ride comfort. The reason for that is their large mass, able to visibly influence the vibrations mode of the carbody. The paper examines the influence of the equipment upon the mode of vertical vibrations of the carbody in the high-speed vehicles, reached on the basis of the frequency response functions of the acceleration in three carbody reference points - at the centre and above the bogies. These functions are derived from the numerical simulations developed on a rigid-flexible coupled model, with seven degrees of freedom. As a rule, the results herein prove the influence of the equipment mounting mode (rigid or elastic, along with the speed regime, upon the level of vibrations in the carbody reference points, at the resonance frequency of the symmetrical bending mode. Similarly, it is also demonstrated how the equipment mass and the damping degree of the suspension system affect the level of the vibrations in the carbody.

  20. Responsibilities of supplier states and consumer states in accommodating supply arrangements to changing circumstances and to identify and evaluate alternative mechanisms for improving supply guarantees consistent with non-proliferation

    International Nuclear Information System (INIS)

    1978-01-01

    The papers by the USA and Australia deal with the responsibility of supplier states and consumer states in accommodating supply arrangements to changing circumstances and with the development of alternative supply guarantees consistent with non-proliferation treaties. A number of theses are evolved for the realisation of these goals; most of them refer to an improvement of bilateral contacts and agreements

  1. Korean Reference HLW Disposal System

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heui Joo; Lee, J. Y.; Kim, S. S. (and others)

    2008-03-15

    This report outlines the results related to the development of Korean Reference Disposal System for High-level radioactive wastes. The research has been supported around for 10 years through a long-term research plan by MOST. The reference disposal method was selected via the first stage of the research during which the technical guidelines for the geological disposal of HLW were determined too. At the second stage of the research, the conceptual design of the reference disposal system was made. For this purpose the characteristics of the reference spent fuels from PWR and CANDU reactors were specified, and the material and specifications of the canisters were determined in term of structural analysis and manufacturing capability in Korea. Also, the mechanical and chemical characteristics of the domestic Ca-bentonite were analyzed in order to supply the basic design parameters of the buffer. Based on these parameters the thermal and mechanical analysis of the near-field was carried out. Thermal-Hydraulic-Mechanical behavior of the disposal system was analyzed. The reference disposal system was proposed through the second year research. At the final third stage of the research, the Korean Reference disposal System including the engineered barrier, surface facilities, and underground facilities was proposed through the performance analysis of the disposal system.

  2. Use of the water supply system of special purpose in buildings

    Directory of Open Access Journals (Sweden)

    Orlov Evgeniy Vladimirovich

    Full Text Available A water supply system of a special purpose is a necessary element in hot and cold shops of the industrial enterprises, office buildings and the medical centers, and also other rooms. The water supply systems of a special purpose, which give subsalty, sparkling water and water sated with oxygen, allow people to prevent, for example, strong dehydration of an organism, which is possible at big losses of water, especially in case of the people working in hot shops. Various elements of special drinking water supply system are given in the article, their main functions are described. Different types of the water folding devices pumping water to consumers, one of which is drinking fountain, are considered. Possible systems of water filtration, which can be established for quality improvement, are transferred. Among them the great role is played by membrane technologies and the return osmosis, which is widely applied now. Today there is a possibility of construction, both the centralized water supply system of a special purpose, and local. Besides, the least is a more preferable option taking into account capital expenditure for construction and operation, and also it can lead to solid resource-saving as a result of the electric energy saving going for water heating in heaters. Automatic machines of drinking water for a local water supply system of a special purpose have indisputable advantages. They are capable to carry out several functions at the same time, and also to distribute water to consumers. It allows placing all the necessary equipment, which will be well in harmony with the environment in their small and compact case, and will fit into any difficult interior of the room. Also they are very easily connected to the systems of an internal water supply system by means of a propylene tube that allows to change their sposition in space and to transfer to any place of the room with fast installation of equipment. Also the ecological effect was

  3. Will implementation of green gas into the gas supply be feasible in the future?

    NARCIS (Netherlands)

    Bekkering, Jan; Hengeveld, Evert Jan; van Gemert, Wim; Broekhuis, A.A.

    Energy efficiency, greenhouse gas reduction and cost price of a green gas supply chain were evaluated. This supply chain is based on co-digestion of dairy cattle manure and maize, biogas upgrading and injection into a distribution gas grid. A defined reference scenario reflects the current state of

  4. Will implementation of green gas into the gas supply be feasible in the future?

    NARCIS (Netherlands)

    Ir. J. Bekkering; prof. dr. Wim van Gemert; A.A. Broekhuis; Drs. E.J. Hengeveld

    2015-01-01

    energy efficiency, greenhouse gas reduction and cost price of a green gas supply chain were evaluated. This supply chain is based on co-digestion of dairy cattle manure and maize, biogas upgrading and injection into a distribution gas grid. A defined reference scenario reflects the current state of

  5. Resonant inverter supplied Interior Permanent Magnet (IPM) motor ...

    African Journals Online (AJOL)

    In this paper, rotor position in relation to the resonant frequency component current in the stator winding of DC-voltage link resonant inverter supplied Interior Permanent Magnet (IPM) motor has been developed. Six reference frames are used to relate the rotor position angle to the resonant frequency component current ...

  6. Modelling the long-run supply of coal

    International Nuclear Information System (INIS)

    Steenblik, R.P.

    1992-01-01

    There are many issues facing policy-makers in the fields of energy and the environment that require knowledge of coal supply and cost. Such questions arise in relation to decisions concerning, for example, the discontinuation of subsidies, or the effects of new environmental laws. The very complexity of these questions makes them suitable for analysis by models. Indeed, models have been used for analysing the behaviour of coal markets and the effects of public policies on them for many years. For estimating short-term responses econometric models are the most suitable. For estimating the supply of coal over the longer term, however - i.e., coal that would come from mines as yet not developed - depletion has to be taken into account. Underlying the normal supply curve relating cost to the rate of production is a curve that increases with cumulative production - what mineral economists refer to as the potential supply curve. To derive such a curve requires at some point in the analysis using process-oriented modelling techniques. Because coal supply curves can convey so succinctly information about the resource's long-run supply potential and costs, they have been influential in several major public debates on energy policy. And, within the coal industry itself, they have proved to be powerful tools for undertaking market research and long-range planning. The purpose of this paper is to describe in brief the various approaches that have been used to model long-run coal supply, to highlight their strengths, and to identify areas in which further progress is needed. (author)

  7. Design of an AC/DC power supply for telecom applications

    Energy Technology Data Exchange (ETDEWEB)

    Suntio, T.; Vallittu, P.; Laurinen, T.; Ikonen, M. [Efore Oy, Espoo (Finland)

    1997-12-31

    Typical Telecom uninterruptible power supply system (UPS) comprises of parallel connected rectifiers and storage batteries supplying DC power for Telecom switching systems on fixed or mobile telephone networks. The requirement is most often of total uninterruptibility meaning high reliability and availability performance as a vital design and development goal. The Telecom systems must also meet stringent noise emission and immunity requirements stipulated by EMC and Low Voltage Directives, European Telecommunications Standard Institute (ETSI) as well as other global and local standards depending on the area they are to be used. This paper will describe in practice the vital features the rectifiers should contain as well as presents results from a practical equipment of 48 V, 500 W. (orig.) 27 refs.

  8. Environmental qualification program of electric equipment for Angra 1

    Energy Technology Data Exchange (ETDEWEB)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C., E-mail: grazi@eletronuclear.gov.br, E-mail: justino@eletronuclear.gov.br, E-mail: candeia@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2017-11-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  9. Environmental qualification program of electric equipment for Angra 1

    International Nuclear Information System (INIS)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C.

    2017-01-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  10. Simulated E-Bomb Effects on Electronically Equipped Targets

    Science.gov (United States)

    2009-09-01

    This enclosing metal barrier, called Faraday Cage , prevents the effect of electromagnetic field interference to the sensitive equipment (Deveci, 2007...utilization of fiber optic cables, which contain no conductive metal , can also reduce the effect of high power microwave weapon. High power microwave...Finally, the modeled results and the two described threshold effect reference data values will be compared and demonstrated to conclude what kind of

  11. Usability analysis of industrial cooking equipment.

    Science.gov (United States)

    Calado, Alexana Vilar Soares; Soares, Marcelo Márcio

    2012-01-01

    This paper refers to the comparative study of the equipment used for cooking in commercial of kitchens restaurants that use the system of traditional cooking and those ones which use the system called smart cooking (combination oven). The study investigates the usability issues concerning to the two systems, analyzing comparatively the aspects related to anthropometry, dimensional variables, the use of the product and also the product safety, as well as issues of information related to operation of the new concepts of cooking in intelligent systems.

  12. Diagnosis - Using automatic test equipment and artificial intelligence expert systems

    Science.gov (United States)

    Ramsey, J. E., Jr.

    Three expert systems (ATEOPS, ATEFEXPERS, and ATEFATLAS), which were created to direct automatic test equipment (ATE), are reviewed. The purpose of the project was to develop an expert system to troubleshoot the converter-programmer power supply card for the F-15 aircraft and have that expert system direct the automatic test equipment. Each expert system uses a different knowledge base or inference engine, basing the testing on the circuit schematic, test requirements document, or ATLAS code. Implementing generalized modules allows the expert systems to be used for any different unit under test. Using converted ATLAS to LISP code allows the expert system to direct any ATE using ATLAS. The constraint propagated frame system allows for the expansion of control by creating the ATLAS code, checking the code for good software engineering techniques, directing the ATE, and changing the test sequence as needed (planning).

  13. High performance current controller for particle accelerator magnets supply

    DEFF Research Database (Denmark)

    Maheshwari, Ram Krishan; Bidoggia, Benoit; Munk-Nielsen, Stig

    2013-01-01

    The electromagnets in modern particle accelerators require high performance power supply whose output is required to track the current reference with a very high accuracy (down to 50 ppm). This demands very high bandwidth controller design. A converter based on buck converter topology is used...

  14. A dynamic perspective of the geopolitical supply risk of metals

    DEFF Research Database (Denmark)

    Habib, Komal; Hamelin, Lorie; Wenzel, Henrik

    2016-01-01

    . In the context of strategic planning and innovation, and in scientific literature, this aspect is often referred to as geopolitical supply risk. In the past few decades, cobalt crisis, the oil embargo, and the more recent Rare Earth Elements (REEs) issue are the best examples regarding the geopolitical supply...... production distribution and more dependent on the location of current geological resources and the future discoveries, as well as on the technological development to improve profitability of mining the currently sub-economical resources....

  15. Automatic test equipment for C and I of compact LWR

    International Nuclear Information System (INIS)

    Mayya, Anuradha; Marathe, P.P.; Madala, Kalyan C.

    2014-01-01

    The C and I of compact LWR consist of a wide variety of electronic modules. Testing of these modules manually was found to be very cumbersome. To ease the testing of these modules, Automatic Test Equipments (ATE) were developed jointly by BARC and ECIL. This paper describes the design of two ATEs for testing 69 types of modules. A power supply ATE was developed for 43 types of power supply modules of type AC-AC, AC-DC, DC-DC and signal conditioning modules. A VME ATE was developed to test 26 types of VME bus based and other microcontroller based non-bussed modules. These ATEs are used for the automated black box testing of modules by feeding power and control inputs and checking the outputs without operator intervention. This paper describes the important considerations in design and the major design challenges. (author)

  16. A Study of Parallels Between Antarctica South Pole Traverse Equipment and Lunar/Mars Surface Systems

    Science.gov (United States)

    Mueller, Robert P.; Hoffman, Stephen, J.; Thur, Paul

    2010-01-01

    The parallels between an actual Antarctica South Pole re-supply traverse conducted by the National Science Foundation (NSF) Office of Polar Programs in 2009 have been studied with respect to the latest mission architecture concepts being generated by the United States National Aeronautics and Space Administration (NASA) for lunar and Mars surface systems scenarios. The challenges faced by both endeavors are similar since they must both deliver equipment and supplies to support operations in an extreme environment with little margin for error in order to be successful. By carefully and closely monitoring the manifesting and operational support equipment lists which will enable this South Pole traverse, functional areas have been identified. The equipment required to support these functions will be listed with relevant properties such as mass, volume, spare parts and maintenance schedules. This equipment will be compared to space systems currently in use and projected to be required to support equivalent and parallel functions in Lunar and Mars missions in order to provide a level of realistic benchmarking. Space operations have historically required significant amounts of support equipment and tools to operate and maintain the space systems that are the primary focus of the mission. By gaining insight and expertise in Antarctic South Pole traverses, space missions can use the experience gained over the last half century of Antarctic operations in order to design for operations, maintenance, dual use, robustness and safety which will result in a more cost effective, user friendly, and lower risk surface system on the Moon and Mars. It is anticipated that the U.S Antarctic Program (USAP) will also realize benefits for this interaction with NASA in at least two areas: an understanding of how NASA plans and carries out its missions and possible improved efficiency through factors such as weight savings, alternative technologies, or modifications in training and

  17. [Equipping the bacteriological laboratories of a tuberculosis service as the most important element of assurance of the quality and safety of their work].

    Science.gov (United States)

    Sevast'ianova, E V; Martynova, L P; Barilo, V N; Golyshevskaia, V I; Shul'gina, M V

    2009-01-01

    By taking into account the present requirements for the equipping of the laboratories, the authors have drawn up the minimum standard list of equipment, as well as a list of additional equipment for the specialized bacteriological laboratory of a tuberculosis-controlling institution, which performs microbiological studies for the diagnosis and control of chemotherapy for tuberculosis. The specifications and characteristics of the baric types of equipment used to fit out the laboratories under the present conditions are described. Equipping the laboratories in accordance with the draw-up lists is shown to ensure a qualitative, effective, and safe work. Recommendations on how to supply the laboratories with equipment, to make the optimal choice, and to use consumables for tests are given.

  18. Reducing supply chain energy use in next-generation vehicle lightweighting

    Energy Technology Data Exchange (ETDEWEB)

    Hanes, Rebecca J.; Das, Sujit; Carpenter, Alberta

    2016-09-29

    equipment is upgraded to the most efficient available. Preliminary analyses indicate that producing CF from lignin instead of polyacrylonitrile, the most commonly used feedstock, reduces energy consumption in the CFRP supply chain by 7.5%, and that implementing energy efficient process equipment produces an additional 8% reduction. Final results will show if these potential reductions are sufficient to make the CFV energy savings comparable with AIV energy savings. [1] Das, S., Graziano, D., Upadhyayula, V. K., Masanet, E., Riddle, M., & Cresko, J. (2016). Vehicle lightweighting energy use impacts in US light-duty vehicle fleet. Sustainable Materials and Technologies, 8, 5-13.

  19. Calibration and qualification of equipment in the pharmaceutical industry: emphasis on radiopharmaceuticals production

    International Nuclear Information System (INIS)

    Melero, Laura T.U.H.; Silva, Katia S. da S.; Zanette, Camila; Araujo, Elaine B. de; Mengatti, Jair

    2011-01-01

    The calibration and qualification of equipment are listed items in RDC number 17 of 2010 which refers about the Good Manufacturing Practice (GMP) of medicaments and RDC number 63 of 2009 which refers about GMP of Radiopharmaceuticals. Both are essential requirements since they are involved in process control to attend the regulatory criteria and are a key part of the validation process. The aim of this work is presenting the importance of calibration and qualification, and the routine use of equipment and facilities in industrial scale production of radiopharmaceuticals in the IPEN/CNEN. The radiopharmacy of IPEN is a pharmaceutical industry that produces radiopharmaceuticals for diagnosis and therapy. It was the pioneer institute in production of radioisotopes and radiopharmaceuticals in Brazil. Currently, 38 products are distributed to the nuclear medicine centers, including primary radioisotopes, labeled molecules and lyophilized reagents for labeling with technetium-99m. To fulfill the GMP requirements for quality assurance of products, several factors must be considered including infrastructure, equipment and raw materials beyond, obviously, the whole production process should be controlled until the release of the final product. Therefore, the calibration and verification of equipment, instruments and other appliances used in the production and quality control should be performed. A program of calibration, qualification and requalification of equipment used in production and quality control of radiopharmaceuticals is necessary for the validation of production processes and analytical methods, and should be established for quality assurance of produced radiopharmaceuticals. (author)

  20. Calibration and qualification of equipment in the pharmaceutical industry: emphasis on radiopharmaceuticals production

    Energy Technology Data Exchange (ETDEWEB)

    Melero, Laura T.U.H.; Silva, Katia S. da S.; Zanette, Camila; Araujo, Elaine B. de; Mengatti, Jair [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2011-07-01

    The calibration and qualification of equipment are listed items in RDC number 17 of 2010 which refers about the Good Manufacturing Practice (GMP) of medicaments and RDC number 63 of 2009 which refers about GMP of Radiopharmaceuticals. Both are essential requirements since they are involved in process control to attend the regulatory criteria and are a key part of the validation process. The aim of this work is presenting the importance of calibration and qualification, and the routine use of equipment and facilities in industrial scale production of radiopharmaceuticals in the IPEN/CNEN. The radiopharmacy of IPEN is a pharmaceutical industry that produces radiopharmaceuticals for diagnosis and therapy. It was the pioneer institute in production of radioisotopes and radiopharmaceuticals in Brazil. Currently, 38 products are distributed to the nuclear medicine centers, including primary radioisotopes, labeled molecules and lyophilized reagents for labeling with technetium-99m. To fulfill the GMP requirements for quality assurance of products, several factors must be considered including infrastructure, equipment and raw materials beyond, obviously, the whole production process should be controlled until the release of the final product. Therefore, the calibration and verification of equipment, instruments and other appliances used in the production and quality control should be performed. A program of calibration, qualification and requalification of equipment used in production and quality control of radiopharmaceuticals is necessary for the validation of production processes and analytical methods, and should be established for quality assurance of produced radiopharmaceuticals. (author)

  1. Managing the Services Supply Chain in the Department of Defense: An Empirical Study of Current Management Practices

    National Research Council Canada - National Science Library

    Apte, Aruna; Apte, Uday; Rendon, Rene G

    2008-01-01

    .... In fact, even considering the high value of weapon systems and large military items purchased in recent years, the DoD has spent more on services than on supplies, equipment and goods (Camm, Blickstein & Venzor, 2004...

  2. Domestic nuclear fuels supply: possibility of an independent technology

    International Nuclear Information System (INIS)

    Cirimello, R.O.

    1982-01-01

    After considering the different energy sources, their consumption and their respective periods of exploitation, technological considerations in the nuclear fuel field are made. The main subject is the Domestic Supply Project of Embalse Fuel (CANDU type). The different aspects which had to be developed during the realization of this project still under progress, and which are fundamental for the command of the technology, are described: 1) Qualification of the produced fuel elements: fuel elements' characteristics; the reactors' operating parameters, and the prototype fuel elements' characteristics; 2) Development of materials and/or suppliers: the obtainment of UO 2 and its physical properties are considered, as well as those of Zircaloy-4, the development of suppliers and the respective developments for the obtainment of materials such as beryllium, helium and colloidal graphite; 3) Processes development; the following processes are studied and defined: UO 2 pellets fabrication with UO 2 granulated powder; beryllium coating under vaccum; and induction brazing of bearing pads and spacers, end cap and end plate resistance welding and stamping of Zircaloy components, graphite-coating of cladding's internal face; 4) Development of special production equipments; automatic equipment for end cap-to-cladding resistance welding among others. The need for a specific program of quality assurance for nuclear fuels supply is emphasized and the basic criteria are established. The IAEA's quality asssurance requirements are also analyzed. (M.E.L.) [es

  3. Development of an Assessment Model for Sustainable Supply Chain Management in Batik Industry

    Science.gov (United States)

    Mubiena, G. F.; Ma’ruf, A.

    2018-03-01

    This research proposes a dynamic assessment model for sustainable supply chain management in batik industry. The proposed model identifies the dynamic relationship between economic aspect, environment aspect and social aspect. The economic aspect refers to the supply chain operation reference model. The environment aspect uses carbon emissions and liquid waste as the attribute assessment, while the social aspect focus on employee’s welfare. Lean manufacturing concept was implemented as an alternative approach to sustainability. The simulation result shows that the average of sustainability score for 5 years increased from 65,3% to 70%. Future experiments will be conducted on design improvements to reach the company target on sustainability score.

  4. Conception for economical energy utilization and supply

    Energy Technology Data Exchange (ETDEWEB)

    Schaefer, H; Canzler, B

    1977-10-01

    This study was performed to study the factors which determine energy consumption within buildings and how to optimize such energy use. The parameters of the principal energy consumers, i.e., HVAC and lighting systems, were analyzed. Possibilities for obtaining economical energy supplies and for reducing energy consumption were studied with emphasis on adapting the building mechanical equipment and the building design and construction to each other. It was concluded that planning for energy conservation in buildings will decrease the cost of constructing and operating buildings if the architect, building contractor and building operator work together from the initial planning stages.

  5. Modeling and analysing storage systems in agricultural biomass supply chain for cellulosic ethanol production

    International Nuclear Information System (INIS)

    Ebadian, Mahmood; Sowlati, Taraneh; Sokhansanj, Shahab; Townley-Smith, Lawrence; Stumborg, Mark

    2013-01-01

    Highlights: ► Studied the agricultural biomass supply chain for cellulosic ethanol production. ► Evaluated the impact of storage systems on different supply chain actors. ► Developed a combined simulation/optimization model to evaluate storage systems. ► Compared two satellite storage systems with roadside storage in terms of costs and emitted CO 2 . ► SS would lead to a more cost-efficient supply chain compared to roadside storage. -- Abstract: In this paper, a combined simulation/optimization model is developed to better understand and evaluate the impact of the storage systems on the costs incurred by each actor in the agricultural biomass supply chain including farmers, hauling contractors and the cellulosic ethanol plant. The optimization model prescribes the optimum number and location of farms and storages. It also determines the supply radius, the number of farms required to secure the annual supply of biomass and also the assignment of farms to storage locations. Given the specific design of the supply chain determined by the optimization model, the simulation model determines the number of required machines for each operation, their daily working schedule and utilization rates, along with the capacities of storages. To evaluate the impact of the storage systems on the delivered costs, three storage systems are molded and compared: roadside storage (RS) system and two satellite storage (SS) systems including SS with fixed hauling distance (SF) and SS with variable hauling distance (SV). In all storage systems, it is assumed the loading equipment is dedicated to storage locations. The obtained results from a real case study provide detailed cost figures for each storage system since the developed model analyses the supply chain on an hourly basis and considers time-dependence and stochasticity of the supply chain. Comparison of the storage systems shows SV would outperform SF and RS by reducing the total delivered cost by 8% and 6%, respectively

  6. Reference-data modelling for tracking and tracing

    NARCIS (Netherlands)

    Dorp, van C.A.

    2004-01-01

    Subject headings: supply chain, tracking and tracing, reference-data modelling

  7. Energy Harvesting Chip and the Chip Based Power Supply Development for a Wireless Sensor Network.

    Science.gov (United States)

    Lee, Dasheng

    2008-12-02

    In this study, an energy harvesting chip was developed to scavenge energy from artificial light to charge a wireless sensor node. The chip core is a miniature transformer with a nano-ferrofluid magnetic core. The chip embedded transformer can convert harvested energy from its solar cell to variable voltage output for driving multiple loads. This chip system yields a simple, small, and more importantly, a battery-less power supply solution. The sensor node is equipped with multiple sensors that can be enabled by the energy harvesting power supply to collect information about the human body comfort degree. Compared with lab instruments, the nodes with temperature, humidity and photosensors driven by harvested energy had variation coefficient measurement precision of less than 6% deviation under low environmental light of 240 lux. The thermal comfort was affected by the air speed. A flow sensor equipped on the sensor node was used to detect airflow speed. Due to its high power consumption, this sensor node provided 15% less accuracy than the instruments, but it still can meet the requirement of analysis for predicted mean votes (PMV) measurement. The energy harvesting wireless sensor network (WSN) was deployed in a 24-hour convenience store to detect thermal comfort degree from the air conditioning control. During one year operation, the sensor network powered by the energy harvesting chip retained normal functions to collect the PMV index of the store. According to the one month statistics of communication status, the packet loss rate (PLR) is 2.3%, which is as good as the presented results of those WSNs powered by battery. Referring to the electric power records, almost 54% energy can be saved by the feedback control of an energy harvesting sensor network. These results illustrate that, scavenging energy not only creates a reliable power source for electronic devices, such as wireless sensor nodes, but can also be an energy source by building an energy efficient

  8. Energy Harvesting Chip and the Chip Based Power Supply Development for a Wireless Sensor Network

    Science.gov (United States)

    Lee, Dasheng

    2008-01-01

    In this study, an energy harvesting chip was developed to scavenge energy from artificial light to charge a wireless sensor node. The chip core is a miniature transformer with a nano-ferrofluid magnetic core. The chip embedded transformer can convert harvested energy from its solar cell to variable voltage output for driving multiple loads. This chip system yields a simple, small, and more importantly, a battery-less power supply solution. The sensor node is equipped with multiple sensors that can be enabled by the energy harvesting power supply to collect information about the human body comfort degree. Compared with lab instruments, the nodes with temperature, humidity and photosensors driven by harvested energy had variation coefficient measurement precision of less than 6% deviation under low environmental light of 240 lux. The thermal comfort was affected by the air speed. A flow sensor equipped on the sensor node was used to detect airflow speed. Due to its high power consumption, this sensor node provided 15% less accuracy than the instruments, but it still can meet the requirement of analysis for predicted mean votes (PMV) measurement. The energy harvesting wireless sensor network (WSN) was deployed in a 24-hour convenience store to detect thermal comfort degree from the air conditioning control. During one year operation, the sensor network powered by the energy harvesting chip retained normal functions to collect the PMV index of the store. According to the one month statistics of communication status, the packet loss rate (PLR) is 2.3%, which is as good as the presented results of those WSNs powered by battery. Referring to the electric power records, almost 54% energy can be saved by the feedback control of an energy harvesting sensor network. These results illustrate that, scavenging energy not only creates a reliable power source for electronic devices, such as wireless sensor nodes, but can also be an energy source by building an energy efficient

  9. Energy Harvesting Chip and the Chip Based Power Supply Development for a Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    Dasheng Lee

    2008-12-01

    Full Text Available In this study, an energy harvesting chip was developed to scavenge energy from artificial light to charge a wireless sensor node. The chip core is a miniature transformer with a nano-ferrofluid magnetic core. The chip embedded transformer can convert harvested energy from its solar cell to variable voltage output for driving multiple loads. This chip system yields a simple, small, and more importantly, a battery-less power supply solution. The sensor node is equipped with multiple sensors that can be enabled by the energy harvesting power supply to collect information about the human body comfort degree. Compared with lab instruments, the nodes with temperature, humidity and photosensors driven by harvested energy had variation coefficient measurement precision of less than 6% deviation under low environmental light of 240 lux. The thermal comfort was affected by the air speed. A flow sensor equipped on the sensor node was used to detect airflow speed. Due to its high power consumption, this sensor node provided 15% less accuracy than the instruments, but it still can meet the requirement of analysis for predicted mean votes (PMV measurement. The energy harvesting wireless sensor network (WSN was deployed in a 24-hour convenience store to detect thermal comfort degree from the air conditioning control. During one year operation, the sensor network powered by the energy harvesting chip retained normal functions to collect the PMV index of the store. According to the one month statistics of communication status, the packet loss rate (PLR is 2.3%, which is as good as the presented results of those WSNs powered by battery. Referring to the electric power records, almost 54% energy can be saved by the feedback control of an energy harvesting sensor network. These results illustrate that, scavenging energy not only creates a reliable power source for electronic devices, such as wireless sensor nodes, but can also be an energy source by building an

  10. Reviews Equipment: BioLite Camp Stove Game: Burnout Paradise Equipment: 850 Universal interface and Capstone software Equipment: xllogger Book: Science Magic Tricks and Puzzles Equipment: Spinthariscope Equipment: DC Power Supply HY5002 Web Watch

    Science.gov (United States)

    2013-05-01

    WE RECOMMEND BioLite CampStove Robust and multifaceted stove illuminates physics concepts 850 Universal interface and Capstone software Powerful data-acquisition system offers many options for student experiments and demonstrations xllogger Obtaining results is far from an uphill struggle with this easy-to-use datalogger Science Magic Tricks and Puzzles Small but perfectly formed and inexpensive book packed with 'magic-of-science' demonstrations Spinthariscope Kit for older students to have the memorable experience of 'seeing' radioactivity WORTH A LOOK DC Power Supply HY5002 Solid and effective, but noisy and lacks portability HANDLE WITH CARE Burnout Paradise Car computer game may be quick off the mark, but goes nowhere fast when it comes to lab use WEB WATCH 'Live' tube map and free apps would be a useful addition to school physics, but maths-questions website of no more use than a textbook

  11. Reference architecture for interoperability testing of Electric Vehicle charging

    NARCIS (Netherlands)

    Lehfuss, F.; Nohrer, M.; Werkmany, E.; Lopezz, J.A.; Zabalaz, E.

    2015-01-01

    This paper presents a reference architecture for interoperability testing of electric vehicles as well as their support equipment with the smart grid and the e-Mobility environment. Pan-European Electric Vehicle (EV)-charging is currently problematic as there are compliance and interoperability

  12. 7 CFR 801.12 - Design requirements incorporated by reference.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Design requirements incorporated by reference. 801.12 Section 801.12 Agriculture Regulations of the Department of Agriculture (Continued) GRAIN INSPECTION... OFFICIAL PERFORMANCE REQUIREMENTS FOR GRAIN INSPECTION EQUIPMENT § 801.12 Design requirements incorporated...

  13. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex E - Report of the electric Equipment Service

    International Nuclear Information System (INIS)

    Sanovic, V.; Stamenkovic, D.

    1985-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  14. Supply Chain Management: Are You Maximizing Your Procurement Activity?

    Science.gov (United States)

    Dobbin, James; Jenkins, Mike

    2000-01-01

    Today's purchasing professionals recognize the need to reduce non-value-added procedures (clerical functions) while emphasizing strategic planning. Results-oriented supply-chain managers need superb communication, negotiation, and leadership skills to achieve long-term value and resist the lowest, first- cost bids. (Contains 13 references.) (MLH)

  15. Forecast demand and supply of energy in the short period. Its forecast and sensitivity analysis until the 2004 fiscal year

    International Nuclear Information System (INIS)

    Yamashita, Yukari; Suehiro, Shigeru; Yanagisawa, Akira; Imaeda, Toshiya; Komiyama, Ryouichi

    2004-01-01

    The object of this report is forecast demand and supply of energy in the 2003 and 2004 fiscal year, which correspond to a business recovery period. A macroeconomics model and an energy supply model are calculated by changing actual GNP, crude oil rate and the rerunning period of nuclear power plants. The calculation results are compared with the reference case. In the first chapter, forecast Japanese economy until the 2004 fiscal year is explained. In the second chapter, the results of energy demand and supply in the first chapter are investigated by the home supply and consumption of primary energy (the reference case) and each energy resources. The sensitivity analytical results of actual GNP, consumer price index, home supply of the primary energy, energy expenditure, sales account of electric power, city gas and fuel by five cases such as reference, increase and decrease of oil cost and increase and decrease of economic growth are investigated. The effects of fast rerunning period of nuclear power plant and atmosphere temperature on these above demands of energies are indicated in the third chapter. (S.Y.)

  16. 42 CFR 421.210 - Designations of regional carriers to process claims for durable medical equipment, prosthetics...

    Science.gov (United States)

    2010-10-01

    ..., Arizona, Washington, Oregon, Montana, Idaho, Utah, Wyoming, North Dakota, South Dakota, Nebraska, Kansas... based on sections 1834(a)(12) and 1834(h) of the Act, which authorize the Secretary to designate one... equipment (and related supplies) as defined in section 1861(n) of the Act; (2) Prosthetic devices (and...

  17. Ecology, Economy and security of supply of the Dutch Electricity Supply System. A scenario based future analysis

    International Nuclear Information System (INIS)

    Roedel, J.G.

    2008-01-01

    The Dutch electricity sector has been transformed into a liberalized international energy market. Market players are free to choose from various electricity generation options when replacing or expanding production capacity. However, choices that are made now will influence emissions (ecology), integral costs (economy) and availability (security of supply) for the next 25 - 40 years. This thesis shows if and how, based on the current electricity supply system, an optimal balance of ecology, economy and security of supply can be achieved. First, the current electricity supply system is described to create a frame of reference. Then, future technological developments are described for electricity production options. Four potential scenarios are constructed featuring various uncertainties: the globalising versus the local economy; priority versus subordination for the environment; and the security/insecurity of the fuel supply. These four scenarios are worked out with a specially developed techno-economic simulation model; the results are analysed in terms of ecology, economy and security of supply. The findings indicate that it is impossible to arrive at an optimal balance for the defined scenarios. Scenarios with a low environmental impact lead to high integral costs and vice versa. However, by applying a smart combination of various modern generation technologies, CO2 capture and storage, the deployment of biomass and the re-use of residual heat it is possible to reach an optimal balance whereby the additional integral costs can be kept under control compared with the lowest-cost scenarios. To achieve this, clear growth and incentive guidelines need to be established for the various production options. This thesis will form a good starting point for that exercise

  18. Radon exposed workplaces in Bavarian public water supplies

    International Nuclear Information System (INIS)

    Heinrich, T.; Huebel, K.; Schindlmeier, W.

    1998-01-01

    From April 1996 to July 1996 a radon-screening in 112 Bavarian water supplies was carried out to determine the radon concentration in workplaces. In some regions with granit or gneiss stones as underground a considerable radiation exposure to the employees in public water supplies can be expected. The median of the measured radon concentration in relevant workplaces is found to be 4000 Bq/m 3 in the areas with granite or gneiss. This is approximately the fourfold of the median measured in a reference area with sandstone as underground. In some workplaces radon concentrations of more than 100000 Bq/m 3 can be found. (orig.) [de

  19. Power supply for coil of poloidal field in a tokamak

    International Nuclear Information System (INIS)

    Kirpichev, I.V.; Spevakova, F.M.

    1984-01-01

    The invention refers to power supply systems of poloidal field winding in tokamaks. The purpose of the invention is the extension of functional capabilities of the circuit by means of use of thyristor and diode keys mounted between convertor sections

  20. Disruption management in a two-period three-tier electronics supply chain

    Directory of Open Access Journals (Sweden)

    Johannes Danusantoso

    2016-12-01

    Full Text Available We study strategies to manage demand disruptions in a three-tier electronics supply chain consisting of an Electronics Manufacturing Services provider, an Original Equipment Manufacturer (OEM, and a Retailer. We model price sensitivity of consumer demand with the two functions commonly used for this purpose, linear and exponential, and introduce disruptions in the demand function. We assume each supply chain member faces an increasing marginal unit cost function. Our decentralized supply chain setting is governed by a wholesale price contract. The OEM possesses greater bargaining power and therefore is the Stackelberg leader. A penalty cost incurred by the Retailer is introduced to capture the cost of deviation from the original plan. We find exact analytical solutions of the effectiveness of managing the disruption when the consumer demand function is linear, and we provide numerical examples as an illustration when the consumer demand function is either linear or exponential. We show that the original production quantity exhibits some robustness under disruptions in both centralized and decentralized supply chains, while the original optimal pricing does not. We show that supply chain managers should not automatically react to an individual disruption, in certain cases it is best to leave the production plan unchanged.

  1. Supply and demand of some critical metals and present status of their recycling in WEEE.

    Science.gov (United States)

    Zhang, Shengen; Ding, Yunji; Liu, Bo; Chang, Chein-Chi

    2017-07-01

    New development and technological innovations make electrical and electronic equipment (EEE) more functional by using an increasing number of metals, particularly the critical metals (e.g. rare and precious metals) with specialized properties. As millions of people in emerging economies adopt a modern lifestyle, the demand for critical metals is soaring. However, the increasing demand causes the crisis of their supply because of their simple deficiency in the Earth's crust or geopolitical constraints which might create political issues for their supply. This paper focuses on the sustainable supply of typical critical metals (indium, rare earth elements (REEs), lithium, cobalt and precious metals) through recycling waste electrical and electronic equipment (WEEE). To illuminate this issue, the production, consumption, expected future demand, current recycling situation of critical metals, WEEE management and their recycling have been reviewed. We find that the demand of indium, REEs, lithium and cobalt in EEE will continuously increasing, while precious metals are decreasing because of new substitutions with less or even without precious metals. Although the generation of WEEE in 2014 was about 41.9 million tons (Mt), just about 15% (6.5 Mt) was treated environmentally. The inefficient collection of WEEE is the main obstacle to relieving the supply risk of critical metals. Furthermore, due to the widespread use in low concentrations, such as indium, their recycling is not just technological problem, but economic feasibility is. Finally, relevant recommendations are point out to address these issues. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. Electronic equipment and software for device 'FAZA'

    International Nuclear Information System (INIS)

    Avdeev, S.P.; Karnaukhov, V.A.; Kuznetsov, V.D.; Petrov, L.A.; Oeschler, H.; Lips, F.; Bart, R.

    1992-01-01

    Electronic equipment and software for the device FAZA are described. The device, designed for studying the nuclear multifragmentation process, consists of 5 time-of-flight telescopes, a position-sensitive avalanche chamber and 58 PM tubes. The time resolution of the time-of-flight telescopes is 0.5 ns, which allows a velocity resolution of 1.5%. The spatial resolution of the large avalanche counter is 4 mm, which allows angular resolution of 1 deg. Analogue signals from each PM tube come to two ADCs, to which strobes are supplied with a 400 ns shift. It allows codes corresponding to Cherenkov radiation and deexcitation of CsJ(Tl) to be distinguished in a two-dimensional plot. 8 refs.; 2 figs

  3. Will implementation of green gas into the gas supply be feasible in the future?

    International Nuclear Information System (INIS)

    Bekkering, J.; Hengeveld, E.J.; Gemert, W.J.T. van; Broekhuis, A.A.

    2015-01-01

    Highlights: • The relation between energy efficiency, greenhouse gas reduction and cost price of a green gas supply chain was analyzed. • Opportunities for improving a green gas supply chain were evaluated. • Fossil and renewable energy resources are made explicit in energy efficiency definition. • Switching to green electricity is the major contributor to improving the energy efficiency and greenhouse gas reduction. - Abstract: The energy efficiency, greenhouse gas reduction and cost price of a green gas supply chain were evaluated. The considered supply chain is based on co-digestion of dairy cattle manure and maize, biogas upgrading and injection into a distribution gas grid. A reference scenario was defined which reflects the current state of practice, assuming that input energy is from fossil origin. Possible improvements of this reference scenario were investigated. For this analysis two new definitions for energy input–output ratio were introduced; one based on input of primary energy from all origin, and one related to energy from fossil origin only. The influence of the improvements on greenhouse gas reduction and cost price was assessed too. Results show that electricity (from fossil origin) is the major contributor to energy input in the reference scenario. Switching to green electricity significantly improves the energy efficiency (both definitions) and greenhouse gas reduction. Preventing methane leakage during digestion and upgrading, and re-using heat within the supply chain also show improvements on these parameters as well as on cost price, although their influence is smaller. Decreasing the share of energy crops in the substrate mix shows a negative effect. It is shown that greenhouse gas reduction of more than 80% is possible with current technology. To meet this high sustainability level, multiple improvement options will have to be implemented in the green gas supply chain. Doing so will result in a modest decrease of the green gas

  4. Operational planning optimization of steam power plants considering equipment failure in petrochemical complex

    International Nuclear Information System (INIS)

    Luo, Xianglong; Zhang, Bingjian; Chen, Ying; Mo, Songping

    2013-01-01

    Highlights: ► We develop a systematic programming methodology to address equipment failure. ► We classify different operation conditions into real periods and virtual periods. ► The formulated MILP models guarantee cost reduction and enough operation safety. ► The consideration of reserving operation redundancy is effective. - Abstract: One or more interconnected steam power plants (SPPs) are constructed in a petrochemical complex to supply utility energy to the process. To avoid large economic penalties or process shutdowns, these SPPs should be flexible and reliable enough to meet the process energy requirement under varying conditions. Unexpected utility equipment failure is inevitable and difficult to be predicted. Most of the conventional methods are based on the assumption that SPPs do not experience any kind of equipment failure. Unfortunately, a process shutdown cannot be avoided when equipment fails unexpectedly. In this paper, a systematic methodology is presented to minimize the total cost under normal conditions while reserving enough flexibility and safety for unexpected equipment failure conditions. The proposed method transforms the different conditions into real periods to indicate normal scenarios and virtual periods to indicate unexpected equipment failure scenarios. The optimization strategy incorporating various operation redundancy scheduling, the transition constraints from equipment failure conditions to normal conditions, and the boiler load increase behavior modeling are presented to save cost and guarantee operation safety. A detailed industrial case study shows that the proposed systematic methodology is effective and practical in coping with equipment failure conditions with only few additional cost penalties

  5. Assessing the utility of ultraviolet irradiation to reduce bacterial biofilms in fish hatchery well water supplies

    Science.gov (United States)

    The accumulation of bacterial biofilms and consequent clogging of screens, pipes, and heat exchanger equipment is problematic for water supply systems contaminated with iron bacteria and other slime forming bacteria. Despite the ubiquitous threat posed by iron bacteria contamination in groundwater s...

  6. Mobility-based Time References for Wireless Sensor Networks

    CERN Document Server

    Sebastiano, Fabio; Makinwa, Kofi A A

    2013-01-01

     This book describes the use of low-power low-cost and extremely small radios to provide essential time reference for wireless sensor networks.  The authors explain how to integrate such radios in a standard CMOS process to reduce both cost and size, while focusing on the challenge of designing a fully integrated time reference for such radios. To enable the integration of the time reference, system techniques are proposed and analyzed, several kinds of integrated time references are reviewed, and mobility-based references are identified as viable candidates to provide the required accuracy at low-power consumption. Practical implementations of a mobility-based oscillator and a temperature sensor are also presented, which demonstrate the required accuracy over a wide temperature range, while drawing 51-uW from a 1.2-V supply in a 65-nm CMOS process. Provides system analysis to understand requirements for time/frequency accuracy in wireless sensor networks; Describes system optimization for time references i...

  7. A new type of accelerator power supply based on voltage-type space vector PWM rectification technology

    International Nuclear Information System (INIS)

    Wu, Fengjun; Gao, Daqing; Shi, Chunfeng; Huang, Yuzhen; Cui, Yuan; Yan, Hongbin; Zhang, Huajian; Wang, Bin; Li, Xiaohui

    2016-01-01

    To solve the problems such as low input power factor, a large number of AC current harmonics and instable DC bus voltage due to the diode or thyristor rectifier used in an accelerator power supply, particularly in the Heavy Ion Research Facility in Lanzhou-Cooler Storage Ring (HIRFL-CSR), we designed and built up a new type of accelerator power supply prototype base on voltage-type space vector PWM (SVPWM) rectification technology. All the control strategies are developed in TMS320C28346, which is a digital signal processor from TI. The experimental results indicate that an accelerator power supply with a SVPWM rectifier can solve the problems above well, and the output performance such as stability, tracking error and ripple current meet the requirements of the design. The achievement of prototype confirms that applying voltage-type SVPWM rectification technology in an accelerator power supply is feasible; and it provides a good reference for design and build of this new type of power supply. - Highlights: • Applying SVPWM rectification technology in an accelerator power supply improves its grid-side performance. • New Topology and its control strategies make an accelerator power supply have bidirectional power flow ability. • Hardware and software of controller provide a good reference for design of this new type of power supply.

  8. A new type of accelerator power supply based on voltage-type space vector PWM rectification technology

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Fengjun, E-mail: wufengjun@impcas.ac.cn [Institute of Modern Physics, CAS, Lanzhou 730000 (China); University of Chinese Academy of Sciences, Beijing 100049 (China); Gao, Daqing; Shi, Chunfeng; Huang, Yuzhen [Institute of Modern Physics, CAS, Lanzhou 730000 (China); Cui, Yuan [Institute of Modern Physics, CAS, Lanzhou 730000 (China); University of Chinese Academy of Sciences, Beijing 100049 (China); Yan, Hongbin [Institute of Modern Physics, CAS, Lanzhou 730000 (China); Zhang, Huajian [Institute of Modern Physics, CAS, Lanzhou 730000 (China); University of Chinese Academy of Sciences, Beijing 100049 (China); Wang, Bin [University of Chinese Academy of Sciences, Beijing 100049 (China); Li, Xiaohui [Institute of Modern Physics, CAS, Lanzhou 730000 (China)

    2016-08-01

    To solve the problems such as low input power factor, a large number of AC current harmonics and instable DC bus voltage due to the diode or thyristor rectifier used in an accelerator power supply, particularly in the Heavy Ion Research Facility in Lanzhou-Cooler Storage Ring (HIRFL-CSR), we designed and built up a new type of accelerator power supply prototype base on voltage-type space vector PWM (SVPWM) rectification technology. All the control strategies are developed in TMS320C28346, which is a digital signal processor from TI. The experimental results indicate that an accelerator power supply with a SVPWM rectifier can solve the problems above well, and the output performance such as stability, tracking error and ripple current meet the requirements of the design. The achievement of prototype confirms that applying voltage-type SVPWM rectification technology in an accelerator power supply is feasible; and it provides a good reference for design and build of this new type of power supply. - Highlights: • Applying SVPWM rectification technology in an accelerator power supply improves its grid-side performance. • New Topology and its control strategies make an accelerator power supply have bidirectional power flow ability. • Hardware and software of controller provide a good reference for design of this new type of power supply.

  9. Managing hospital supplies: process reengineering at Gujarat Cancer Research Institute, India.

    Science.gov (United States)

    Ramani, K V

    2006-01-01

    Aims to give an overview of the re-engineering of processes and structures at Gujarat Cancer Research Institute (GCRI), Ahmedabad. A general review of the design, development and implementation of reengineered systems in order to address concerns about the existing systems. Findings GCRI is a comprehensive cancer care center with 550 beds and well equipped with modern diagnostic and treatment facilities. It serves about 200,000 outpatients and 16,000 inpatients annually. The approach to a better management of hospital supplies led to the design, development, and implementation of an IT-based reengineered and integrated purchase and inventory management system. The new system has given GCRI a saving of about 8 percent of its annual costs of purchases, and improved the availability of materials to the user departments. Shows that the savings obtained are used not only for buying more hospital supplies, but also to buy better quality of hospital supplies, and thereby satisfactorily address the GCRI responsibility towards meeting its social obligations for cancer care.

  10. 46 CFR 162.050-4 - Incorporation by reference: Where can I get a copy of the publications mentioned in this part?

    Science.gov (United States)

    2010-10-01

    ... ENGINEERING EQUIPMENT Pollution Prevention Equipment § 162.050-4 Incorporation by reference: Where can I get a....org): (1) International Standard ISO 8217 Third edition 2005-11-01, Petroleum products—Fuels (class F)—Specifications of marine fuels (“ISO 8217”), incorporation by reference approved for § 162.050-20. (2...

  11. Uncovering high rates of unsafe injection equipment reuse in rural Cameroon: validation of a survey instrument that probes for specific misconceptions

    Directory of Open Access Journals (Sweden)

    Reid Savanna R

    2011-02-01

    Full Text Available Abstract Background Unsafe reuse of injection equipment in hospitals is an on-going threat to patient safety in many parts of Africa. The extent of this problem is difficult to measure. Standard WHO injection safety assessment protocols used in the 2003 national injection safety assessment in Cameroon are problematic because health workers often behave differently under the observation of visitors. The main objective of this study is to assess the extent of unsafe injection equipment reuse and potential for blood-borne virus transmission in Cameroon. This can be done by probing for misconceptions about injection safety that explain reuse without sterilization. These misconceptions concern useless precautions against cross-contamination, i.e. "indirect reuse" of injection equipment. To investigate whether a shortage of supply explains unsafe reuse, we compared our survey data against records of purchases. Methods All health workers at public hospitals in two health districts in the Northwest Province of Cameroon were interviewed about their own injection practices. Injection equipment supply purchase records documented for January to December 2009 were compared with self-reported rates of syringe reuse. The number of HIV, HBV and HCV infections that result from unsafe medical injections in these health districts is estimated from the frequency of unsafe reuse, the number of injections performed, the probability that reused injection equipment had just been used on an infected patient, the size of the susceptible population, and the transmission efficiency of each virus in an injection. Results Injection equipment reuse occurs commonly in the Northwest Province of Cameroon, practiced by 44% of health workers at public hospitals. Self-reported rates of syringe reuse only partly explained by records on injection equipment supplied to these hospitals, showing a shortage of syringes where syringes are reused. Injection safety interventions could

  12. Prediction degradation trend of nuclear equipment based on GM (1, 1)-Markov chain

    International Nuclear Information System (INIS)

    Zhang Liming; Zhao Xinwen; Cai Qi; Wu Guangjiang

    2010-01-01

    The degradation trend prediction results are important references for nuclear equipment in-service inspection and maintenance plan. But it is difficult to predict the nuclear equipment degradation trend accurately by the traditional statistical probability due to the small samples, lack of degradation data and the wavy degradation locus. Therefore, a method of equipment degradation trend prediction based on GM (1, l)-Markov chain was proposed in this paper. The method which makes use of the advantages of both GM (1, 1) method and Markov chain could improve the prediction precision of nuclear equipment degradation trend. The paper collected degradation data as samples and accurately predicted the degradation trend of canned motor pump. Compared with the prediction results by GM (1, 1) method, the prediction precision by GM (1, l)-Markov chain is more accurate. (authors)

  13. Trends in the use of digital technology for control and regulation of power supplies

    International Nuclear Information System (INIS)

    Carwardine, J.; Lenkszus, F.

    1999-01-01

    Since the availability of computers, accelerator power supplies have relied on digital technology in some way, from such simple tasks as turning the supplies on and off to the supplying of computer-controlled references. However, advances in digital technology, both in performance and cost, allow considerably more than simple control and monitoring. This, coupled with increasing demand for higher performance and monitoring capabilities, has made it appealing to integrate such technology into power supply designs. This paper will review current trends in the use of such advanced technology as embedded DSP controllers, and the application of real-time algorithms to the regulation and control of power supplies for accelerators and other large-scale physics applications

  14. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  15. AN EVALUATION OF SUPPLY CHAIN MANAGEMENT IN A GLOBAL PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    Marco Antonio Viana Borges

    2015-03-01

    Full Text Available Thecharacteristics and challenges of the integrated market, along with the risinginternational cooperation and vertical disintegration, have led to the notionthat firms are linked in a global supply chain. This study is focused onconcepts and models organized for the development of a theoretical essay inGlobal Supply Chain Management to evaluate characteristics and opportunities inthis field. It was used references that cover the global market factorsinvolving economic, cultural, political and demographic issues that representopportunities and barriers for going global.  It was indentified that the challenge relatedto the international operations is to develop a global strategy considering theinfluence of political and economic factors in the trade, culturalcharacteristics, supply chain costs, infrastructure, technology, market andcompetitive rules. From the elements raised from theory for the configurationof a global supply chain approach, this study also identified gaps andquestions for future research agenda in the area.

  16. MODEL BASED BIOMASS SYSTEM DESIGN OF FEEDSTOCK SUPPLY SYSTEMS FOR BIOENERGY PRODUCTION

    Energy Technology Data Exchange (ETDEWEB)

    David J. Muth, Jr.; Jacob J. Jacobson; Kenneth M. Bryden

    2013-08-01

    Engineering feedstock supply systems that deliver affordable, high-quality biomass remains a challenge for the emerging bioenergy industry. Cellulosic biomass is geographically distributed and has diverse physical and chemical properties. Because of this feedstock supply systems that deliver cellulosic biomass resources to biorefineries require integration of a broad set of engineered unit operations. These unit operations include harvest and collection, storage, preprocessing, and transportation processes. Design decisions for each feedstock supply system unit operation impact the engineering design and performance of the other system elements. These interdependencies are further complicated by spatial and temporal variances such as climate conditions and biomass characteristics. This paper develops an integrated model that couples a SQL-based data management engine and systems dynamics models to design and evaluate biomass feedstock supply systems. The integrated model, called the Biomass Logistics Model (BLM), includes a suite of databases that provide 1) engineering performance data for hundreds of equipment systems, 2) spatially explicit labor cost datasets, and 3) local tax and regulation data. The BLM analytic engine is built in the systems dynamics software package PowersimTM. The BLM is designed to work with thermochemical and biochemical based biofuel conversion platforms and accommodates a range of cellulosic biomass types (i.e., herbaceous residues, short- rotation woody and herbaceous energy crops, woody residues, algae, etc.). The BLM simulates the flow of biomass through the entire supply chain, tracking changes in feedstock characteristics (i.e., moisture content, dry matter, ash content, and dry bulk density) as influenced by the various operations in the supply chain. By accounting for all of the equipment that comes into contact with biomass from the point of harvest to the throat of the conversion facility and the change in characteristics, the

  17. The spread model of food safety risk under the supply-demand disturbance.

    Science.gov (United States)

    Wang, Jining; Chen, Tingqiang

    2016-01-01

    In this paper, based on the imbalance of the supply-demand relationship of food, we design a spreading model of food safety risk, which is about from food producers to consumers in the food supply chain. We use theoretical analysis and numerical simulation to describe the supply-demand relationship and government supervision behaviors' influence on the risk spread of food safety and the behaviors of the food producers and the food retailers. We also analyze the influence of the awareness of consumer rights protection and the level of legal protection of consumer rights on the risk spread of food safety. This model contributes to the explicit investigation of the influence relationship among supply-demand factors, the regulation behavioral choice of government, the behavioral choice of food supply chain members and food safety risk spread. And this paper provides a new viewpoint for considering food safety risk spread in the food supply chain, which has a great reference for food safety management.

  18. Reliability of the electric power supply in the safety apparatus of nuclear power plants: a comparative analysis

    International Nuclear Information System (INIS)

    Cruz, L.A.

    1992-01-01

    This paper discusses the risk of total loss of electric power supply to the Class 1E system. Two alternatives are focused: a system with two off-site and two onsite power supplies emergency power supply, as recommended by the American Regulations, and a system with only one off-site and four on-site power supplies, applicable when two off-site are not available. To allow the fact that the equipment can be repaired, the method proper involves use of the Markov model, with which one can find, for each configuration of the system, the change over time of the probability of a simultaneous failure of all power sources. The sensitivity of each parameter is studied in each case and, on the basis of the results of the study, the author conclude that the system with two off-site power supplies is preferable in all alternatives analysed, although the system with one off-site power supply can be adopted with high reliability diesel-generators. (author)

  19. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  20. Manual on Safety Aspects of the Design and Equipment of Hot Laboratories

    International Nuclear Information System (INIS)

    1969-01-01

    With the development of atomic energy application and research, hot laboratories are now being constructed in a number of countries. The present publication describes and discusses experience in several countries in designing equipment for these laboratories. The safe handling of highly radioactive substances is the main purpose of hot laboratory design and equipment. The manual aims at helping those persons, particularly in the developing countries, who plan to design and construct a new hot laboratory or modify an existing one. It does not deal in great detail with the engineering design of protective and handling equipment; these matters can be found in the comprehensive list of references. The manual itself covers only basic ideas and different approaches in the design of laboratory building, hot cells, shielded and glove boxes, fume cupboards, and handling and viewing equipment. Systems for transferring materials and main services are also discussed.

  1. Nuclear steam supply system KLT-40 enhanced safety as independent power supply source. Employment prospects

    International Nuclear Information System (INIS)

    Polunichev, V.I.; Sayanov, D.G.; Ardabievsky, A.A.

    1993-01-01

    High quality of KLT-40 nuclear steam supply system (NSSS) providing enhanced safety is attained owing to the development and operation experience of equipments and systems in Soviet nuclear icebreakers. First of all they are the operating nuclear-powered icebreakers open-quotes Arktikaclose quotes, open-quotes Sibirclose quotes, open-quotes Rossiyaclose quotes, open-quotes Sovetsky Soyuzclose quotes, the limited draught icebreakers of joint Soviet-Finnish manufacturing open-quotes Taimyrclose quotes open-quotes Vaigachclose quotes. 30-years trouble-free operation of icebreaker open-quotes Leninclose quotes, the ancestor of nuclear powered fleet, is unprecedented. Operation life of individual equipment items amounts to 107000 hours, that testifies to high reliability and life characteristics of NSSS. Trouble-free operation of the nuclear-powered icebreakers' reactor plants (RPs) exceeded 130 reactor years, that proves high quality of design decisions being underlain in the basis of the KLT-40 NSSS for the lighter-cargo carrier open-quotes Sevmorputclose quotes, which was put into operation into 1988. Besides it testifies to the expediency of KLT-40 NSSS employment as a power source in different power installations. The KLT-40 is a reactor plant with a pwr type reactor. The design is described in detail with diagrams

  2. Current regulators for I/SUP 2/L circuits to be operated from low-voltage power supplies

    DEFF Research Database (Denmark)

    Bruun, Erik; Hansen, Ole

    1980-01-01

    A new bandgap current reference is described which can be used to control the injector current of I/SUP 2/L circuits for supply voltages down to about 1 V. For small currents the total injector current is obtained as a mirror of the reference current. For large injector currents the current control......, but well controlled temperature coefficient is desired. It is shown how a temperature stable ring oscillator with I/SUP 2/L gates can be constructed by tailoring the temperature dependence of the supply current appropriately....

  3. Assessment of lightning impact frequency for process equipment

    International Nuclear Information System (INIS)

    Necci, Amos; Antonioni, Giacomo; Cozzani, Valerio; Krausmann, Elisabeth; Borghetti, Alberto; Nucci, Carlo Alberto

    2014-01-01

    Fires and explosions triggered by lightning strikes are among the most frequent Natech scenarios affecting the chemical and process industry. Although lightning hazard is well known, well accepted quantitative procedures to assess the contribution of accidents caused by lightning to industrial risk are still lacking. In the present study, a quantitative methodology for the assessment of the expected frequency of lightning capture by process equipment is presented. A specific model, based on Monte Carlo simulations, was developed to assess the capture frequency of lightning for equipment with a given geometry. The model allows the assessment of lay-out effects and the reduction of the capture probability due to the presence of other structures or equipment items. The results of the Monte Carlo simulations were also used to develop a simplified cell method allowing a straightforward assessment of the lightning impact probability in a quantitative risk assessment framework. The developed approach allows an in-depth analysis of the hazard due to lightning impact by identifying equipment items with the highest expected frequency of lightning impacts in a given lay-out. The model thus supplies useful data to approach the assessment of the quantitative contribution of lightning-triggered accidents to industrial risk. - Highlights: • A specific approach to storage tank lightning impact frequency calculation was developed. • The approach is suitable for the quantitative assessment of industrial risk due to lightning. • The models developed provide lightning capture frequency based on tank geometry. • Lay-out effects due to nearby structures are also accounted. • Capture frequencies may be as high as 10 −1 events/year for standalone unprotected tanks

  4. 7 CFR 801.7 - Reference methods and tolerances for near-infrared spectroscopy (NIRS) analyzers.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Reference methods and tolerances for near-infrared spectroscopy (NIRS) analyzers. 801.7 Section 801.7 Agriculture Regulations of the Department of Agriculture...), DEPARTMENT OF AGRICULTURE OFFICIAL PERFORMANCE REQUIREMENTS FOR GRAIN INSPECTION EQUIPMENT § 801.7 Reference...

  5. Evolutionary Game Model Study of Construction Green Supply Chain Management under the Government Intervention

    Science.gov (United States)

    Xing, Yuanzhi; Deng, Xiaoyi

    2017-11-01

    The paper first has defined the concepts of green supply chain management and evolution game theory, and pointed out the characteristics of green supply chain management in construction. The main participants and key links of the construction green supply chain management are determined by constructing the organization framework. This paper established the evolutionary game model between construction enterprises and recycling enterprises for the green supply chain closed-loop structure. The waste recycling evolutionary stability equilibrium solution is obtained to explore the principle and effective scope of government policy intervention. This paper put forward the relevant countermeasures to the green supply chain management in construction recycling stage from the government point of view. The conclusion has reference value and guidance to the final product construction enterprises, recycling enterprises and the government during green supply chain.

  6. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  7. Calibration of the indicators of the product KERMa-AREA in radiodiagnostic equipment

    International Nuclear Information System (INIS)

    Ginjaume, M.; Jarvinen, H.; Turak, O.

    2013-01-01

    Currently the IAEA proposes two procedures for the calibration of the determination of the PKA systems integrated in the x-ray equipment. The traditional method is to measure air kerma at a certain distance from the focus through an ionization chamber reference and then the area of the field of radiation in that position. The alternative method is based on measuring directly the product kerma-area using equipment calibrated in this magnitude. In both cases the calibration procedure takes into account the position of the tube on the stretcher of the patient. The objective of this study was to compare the practical application of both calibration procedures as well as assess the accuracy of indication of the PKA in the consoles of the radiology equipment. (Author)

  8. Transient phenomena analysis of a DC-1 MV power supply for the ITER NBI

    International Nuclear Information System (INIS)

    Yamamoto, Masanori; Watanabe, Kazuhiro; Yamanaka, Haruhiko; Takemoto, Jumpei; Inoue, Takashi; Yamashita, Yasuo

    2010-08-01

    A power supply for the ITER Neutral Beam Injector (NBI) is a DC ultra-high voltage (UHV) power supply to accelerate negative ion beams of 40 A up to an energy of 1 MeV. Japan Atomic Energy Agency as the Japan Domestic Agency for ITER contributes procurement of dc -1 MV main components such as step-up -1 MV transformers rectifiers, a high voltage deck 2, a -1 MV insulating transformer, a transmission line, a surge reduction system and equipments for site test. Design of the surge suppression in the NBI power supply is one of the key issues to obtain the stable injector performance. This report describes the design study using EMTDC code on the surge suppression by optimizing the core snubber and additional elements in the -1 MV power supply. The results show that the input energy from the stray capacitance to the accelerator at the breakdown can be reduced to about 25 J that is smaller than design criteria for ITER. (author)

  9. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  10. Positron Accumulator Ring (PAR) power supply

    International Nuclear Information System (INIS)

    Fathizadeh, M.

    1995-01-01

    The Positron Accumulator Ring (PAR) consists of 8 dipole magnets connected in series. These magnets are energized via one 12-pulse dc power supply. The power supply consists of four phase controlled half-wave wye group converters. Each of the two half-wave converters are connected through an interphase transformer to obtain a full-wave converter with 120 degrees conduction. The input voltage for these two half-wave converters are 180 degrees apart. The two full-wave converters are connected in parallel through a third interphase transformer. This type of connection of the converters not only provides the required output current, it also improves the input power factor of the power supply. The output of the wye group converters is filtered through a passive L-R-C filter to reduce the ripple content of the output current. At low current values of the power supply the current ripple is high, thus a large filter is needed, which adds to the cost of the power supply, however at high output current levels, the current ripple is less severe. The large size of the filter can be reduced by adding an anti-parallel rectifier diode(D1) to the output of the power supply. A freewheeling diode(D2) is connected before the choke to circulate the current once the power supply is turned off. In order to measure the current in the magnet a high precision, low drift, zero flux current transductor is used. This transductor senses the magnet current which provides a feedback signal to control the gating of the converter's thyristors. A true 14 bit Digital to Analog Converter (DAC) is programmed by the control computer for the required current value, providing a reference for the current regulator. Fast correction of the line transients is provided by a relatively fast voltage loop controlled by a high gain slow response current loop

  11. PROACTIVE DEFENSE FOR EVOLVING SUPPLY CHAIN COUNTERFEITING

    Science.gov (United States)

    2015-12-01

    counterfeiters who reprocess the parts and sell them as original products .4 Information Communication Technology (ICT): refers to the information and...company that originally built a product .9 Supply Chain Risk: risks that arise from the confidentiality, integrity, or availability of information...four different graduate schools spread across 22 years of marriage. For the past few years, she has endured a life with an " absentee husband" who

  12. Estimating Access to Drinking Water Supply, Sanitation, and Hygiene Facilities in Wolaita Sodo Town, Southern Ethiopia, in Reference to National Coverage.

    Science.gov (United States)

    Admasie, Amha; Debebe, Ashenafi

    2016-01-01

    Introduction . The coverage of sanitation and access to safe drinking water in Ethiopia especially in Wolaita Sodo town are not well studied. Therefore, the main objective of this study was estimating access to drinking water supply, sanitation, and hygiene facilities in Wolaita Sodo town, southern Ethiopia, in reference to national coverage. Methods . A community based cross-sectional study design method was employed in the study in 588 households of Wolaita Sodo town inhabitants. Face-to-face interview to household owners, in-depth interview to key informants, reviewing secondary data, and observational check lists were used to collect data. Districts were selected using simple random sampling techniques, while systematic random sampling technique was applied to select households. Data was analyzed using Epi Info version 3.5.4 and SPSS version 16 statistical software. Bivariate and multivariable logistic regression analysis were carried out. Results . The community has access to improved water supply which was estimated to be 67.9%. The main water sources of the town were tap water within the yard, which was estimated to be 44.7%, and tap water in the community was 40.0% followed by private protected well which was 14.5%. Ninety-one percent of the households had at least one type of latrine in their homes. The most common type of latrine available to households was pit latrine with superstructure which was estimated to be 75.9% followed by a pit without superstructure, 21.3%, and more than half of the respondents had hand washing facilities in their compound. Occupational status, educational status, and training on water, sanitation, and hygiene related topics were significantly associated with use of improved water source, improved sanitation, and hygiene facilities. Conclusion . In order to address the demand of the town, additional water, sanitation, and hygiene programs are required.

  13. Estimating Access to Drinking Water Supply, Sanitation, and Hygiene Facilities in Wolaita Sodo Town, Southern Ethiopia, in Reference to National Coverage

    Science.gov (United States)

    Debebe, Ashenafi

    2016-01-01

    Introduction. The coverage of sanitation and access to safe drinking water in Ethiopia especially in Wolaita Sodo town are not well studied. Therefore, the main objective of this study was estimating access to drinking water supply, sanitation, and hygiene facilities in Wolaita Sodo town, southern Ethiopia, in reference to national coverage. Methods. A community based cross-sectional study design method was employed in the study in 588 households of Wolaita Sodo town inhabitants. Face-to-face interview to household owners, in-depth interview to key informants, reviewing secondary data, and observational check lists were used to collect data. Districts were selected using simple random sampling techniques, while systematic random sampling technique was applied to select households. Data was analyzed using Epi Info version 3.5.4 and SPSS version 16 statistical software. Bivariate and multivariable logistic regression analysis were carried out. Results. The community has access to improved water supply which was estimated to be 67.9%. The main water sources of the town were tap water within the yard, which was estimated to be 44.7%, and tap water in the community was 40.0% followed by private protected well which was 14.5%. Ninety-one percent of the households had at least one type of latrine in their homes. The most common type of latrine available to households was pit latrine with superstructure which was estimated to be 75.9% followed by a pit without superstructure, 21.3%, and more than half of the respondents had hand washing facilities in their compound. Occupational status, educational status, and training on water, sanitation, and hygiene related topics were significantly associated with use of improved water source, improved sanitation, and hygiene facilities. Conclusion. In order to address the demand of the town, additional water, sanitation, and hygiene programs are required. PMID:28025598

  14. DEVELOPMENT OF COMPLEX EQUIPMENT FOR PLASMA SPRAY CERAMIC COATINGS

    Directory of Open Access Journals (Sweden)

    V. V. Okovity

    2017-01-01

    Full Text Available Develop a set equipment for plasma forming ceramic coatings. The article presents characteristics and parameters of the developed complex equipment for formation of plasma ceramic coatings as well as results of its testing. Methods of research is based on studies of structural elements composite plasma coatings system ZrO2 – Y2O3  obtained  using  developed complex equipment. One of the most effective ways to protect the components from high temperature corrosion and oxidation is formation on the surface of plasma thermal barrier coatings. For thermal barrier coating has very strict requirements: сharacterized by a smooth change of physico-mechanical properties (porosity, microhardness, elastic modulus in the cross section of the metal substrate to the outer ceramic layer; to withstand multiple cycles of thermal cycling from room temperature to the operating temperature; to maintain gastightness under operating conditions and thus ensure a sufficiently high level of adhesive strength. For realization of new technological schemes applying thermal barrier coatings with high operational characteristics was developed, patented and manufactured a range of new equipment. The experiments show that authors developed PBG-1 plasmatron and powder feeder PPBG-04 have at least 2–3 times the service life during the deposition of ceramic materials compared to the standard equipment of the company "Plasma-Technik", by changing the structure of the cathode-anode plasma torch assembly and construction of the delivery unit of the feeder to facilitate the uniform supply of the powder into the plasma jet and the best of his penetration. The result is better plasma coatings with improved operational characteristics: adhesion strength is increased to 1.3–2 times, material utilization in 1.5–1.6 times microhardness 1.2–1.4 times the porosity is reduced by 2–2.5 times.

  15. Construction and equipment requirements for installations and laboratories handling unsealed radioactive materials in low and medium activity - Proposal of an Israeli standard

    Energy Technology Data Exchange (ETDEWEB)

    Ben-Shlomo, A; Schlesinger, T; Barshad, M [Soreq Nuclear Research Center, Yavne (Israel)

    1993-10-01

    Working with unsealed radioactive materials involves risks of internal or external exposure to ionizing radiation. Exposure of human beings to ionizing radiation involves adverse health effects and must be prevented or at least reduced to reasonable levels. Radiation sources in this work are unsealed radioactive materials, that may be solids, liquid or in gaseous states, and in varying toxic levels. Various works and actions that are performed on the unsealed radioactive materials have varying potentials of dispersion, contamination and exposure, so that the combination of the type of work activity, isotope characteristics and physical state dictate the internal and external exposure risks. In order to limit the exposure of the personnel of installations and laboratories which deals with unsealed radioactive materials, national and international authorities and organizations standards and procedures for the requirements of construction and equipment of such installations and laboratories. This document means to be a proposal for an Israeli standard requirements for equipment and construction of installations working with low and medium activity unsealed radioactive materials. The targets for defining the, construction and equipment, requirements are: a. Safety and proper protection of personnel and public from external and internal exposure while the work is done properly. Proper protection against the risk of contaminating the environment. c. Standardization of requirements. d. Proper design of installations and laboratories. e. Supply means for evaluation and reduction of construction costs.The equipment detailed here refers to fixed (none movable) equipment which is a part of the construction of the laboratory or installation, unless specified otherwise. The document starts with a review of the recommendations of some international organizations (WHO, IAEA, NRPB) for construction and equipment requirements for these laboratories and installations. Then the

  16. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  17. Supply, Demand, and the Internet--Economic Lessons for Microeconomic Principles Courses.

    Science.gov (United States)

    Englander, Fred; Moy, Ronald L.

    2003-01-01

    Addresses issues related to the ways in which the Internet is affecting supply and demand, competition, property rights, information costs, and economies of scale. Suggests ways to incorporate these topics into the study of microeconomics. (Contains 19 references.) (SK)

  18. Supply assurance in the nuclear fuel cycle

    International Nuclear Information System (INIS)

    Neff, T.L.; Jacoby, H.D.

    1979-01-01

    Nuclear fuel assurance, in the face of world and political uncertainties, is interrelated with nuclear technology development plans and international safeguards considerations. This has led some countries to accelerate their commitments to nuclear commercialization faster than necessary and has made non-proliferation policies harder to enforce. Fuel assurance is described on a national basis in three time scales: short-term, or resilience to supply interruptions; mid-term, or contract conditions in which governments make commitments to purchase or deliver; and long-term, or resource adequacy. A review of former assurance problems and current trends in the enrichment and uranium markets indicates that supplier concentration is no longer the major problem so much as non-proliferation actions. The present state of unstable equilibrium is expected to move in the direction of less fuel-supply assurance for countries having a small market or not subscribing to non-proliferation criteria. The authors, while generally optimistic that the fuel-supply system will function, express concern that policies for fuel stockpiles and the condition of uranium markets need improvement. 21 references

  19. Distribution switchgear

    CERN Document Server

    Stewart, Stan

    2004-01-01

    Switchgear plays a fundamental role within the power supply industry. It is required to isolate faulty equipment, divide large networks into sections for repair purposes, reconfigure networks in order to restore power supplies and control other equipment.This book begins with the general principles of the Switchgear function and leads on to discuss topics such as interruption techniques, fault level calculations, switching transients and electrical insulation; making this an invaluable reference source. Solutions to practical problems associated with Distribution Switchgear are also included.

  20. Vaccine supply chains need to be better funded and strengthened, or lives will be at risk.

    Science.gov (United States)

    Kaufmann, Judith R; Miller, Roger; Cheyne, James

    2011-06-01

    In the next decade, at least twelve additional vaccines that target such diseases as typhoid, malaria, and dengue will become available to lower- and middle-income countries. These vaccines must travel along what are called supply chains, which include all personnel, systems, equipment, and activities involved in ensuring that vaccines are effectively delivered from the point of production to the people who need them. But for various reasons, supply chains are already strained in many developing countries, and the potential inability to distribute new vaccines will place lives at risk. Among the many steps needed to strengthen the global vaccine supply chain, we suggest that the international community pursue improved coordination between organizations that donate and ship vaccines and the host-country officials who receive and distribute the vaccines, as well as better training for supply-chain managers.

  1. Role of behavioural factors in green supply chain management implementation in Indian mining industries

    DEFF Research Database (Denmark)

    Muduli, K.; Govindan, Kannan; Barve, A.

    2013-01-01

    Green supply chain management (GSCM) integrates ecological concepts with those of supply chain management in order to minimize energy and material usage and to reduce adverse impacts of supply chain activities on the environment. GSCM implementation in mining industries depends largely upon certain...... be taken as a reference by the decision makers while deciding the hierarchy of action necessary for effective implementation of green practices in mining supply chains. The present research attempts to explore various behavioural factors affecting GCSM practices and their interactions which help to attain...... green-enabled needs. Interpretive structural modelling (ISM) is employed in this research to extract the interrelationships among the identified behavioural factors....

  2. The application of supply chain management principles to emergency management logistics: An empirical study.

    Science.gov (United States)

    Peterson, Matthew R; Young, Richard R; Gordon, Gary A

    2016-01-01

    Key elements of supply chain theory remain relevant to emergency management (EM) logistics activities. The Supply Chain Operations Reference model can also serve as a useful template for the planning, organizing, and execution of EM logistics. Through a series of case studies (developed through intensive survey of organizations and individuals responsible for EM), the authors identified the extent supply chain theory is being adopted and whether the theory was useful for emergency logistics managers. The authors found several drivers that influence the likelihood of an organization to implement elements of supply chain management: the frequency of events, organizational resources, population density, range of events, and severity of the disaster or emergency.

  3. Seizing market shaping opportunities for vaccine cold chain equipment.

    Science.gov (United States)

    Azimi, Tara; Franzel, Lauren; Probst, Nina

    2017-04-19

    Gavi, the Vaccine Alliance, supports immunisation programmes in eligible countries to reach children with lifesaving vaccines. Dramatic improvement in the scale and performance of current cold chain systems is required to extend the reach of immunisation services - especially for children living in remote locations - to advance progress towards full vaccine coverage. Achieving these improvements will require a healthier market for cold chain equipment where the products meet user needs, are sustainably priced, and are available in sufficient quantities to meet demand. Yet evidence suggests that the cold chain market has suffered from several failures including limited demand visibility, fragmented procurement, and insufficient information exchange between manufacturers and buyers on needs and equipment performance. One of Gavi's strategic goals is to shape markets for vaccines and other immunisation products, including cold chain equipment and in 2015, Gavi created a new mechanism - the Cold Chain Equipment (CCE) Optimisation Platform - to strengthen country cold chain systems by offering financial support and incentives for higher performing CCE. The main objective of the CCE Platform is to get more equipment that is efficient, sustainable, and better performing deployed to every health facility where it is required at an affordable price. To achieve these objectives, Gavi is putting in place tested market shaping approaches and tools adapted for the CCE market: the development of market strategies or 'roadmaps'; improvement of product performance through the development of target product profiles (TPPs); strategic engagement with CCE manufacturers and countries to enhance information sharing; and tailoring procurement tactics to the CCE market. These approaches and tools will allow for increased demand and supply of higher-performing, cost-effective and quality products. By strengthening immunisation systems with improved cold chain equipment, Gavi countries can

  4. Simulation of an autonomous power supply system based on lithium-iron-phosphate (LiFePO4

    Directory of Open Access Journals (Sweden)

    Popov Mikhail

    2017-01-01

    Full Text Available Optimization of equipment composition and operation mode of power supply systems with renewable energy sources is an important and urgent task. As a result of the study, graphs of generation and consumption of electrical energy, charge-discharge characteristics of electric energy storage devices were constructed, the type and capacity of storage batteries were selected, the solar power plant scheme was developed and the main equipment was selected in accordance with the scheme, the economic efficiency of the solar power plant project was estimated and the payback period was determined.

  5. Design of arc power supply for neutral beam injection system based on super capacitor energy storage

    International Nuclear Information System (INIS)

    Yang Puqiong; Xuan Weimin; Cao Jianyong; Li Qing; Liu Xiaolong

    2015-01-01

    The arc power supply is one of the most important equipment for neutral beam injection system. The stability of arc discharge and the quality of ion beam extraction were determined by its performance. For improving stability of the arc discharge, reducing the power network capacity and decreasing impulse on power network, the topology of the arc power supply applied the structure of DC/DC converter based on technology of super capacitor energy storage and switching power supply. Several IGBT power modules are operated in parallel, and it can improve the arc power supply's operating frequency and dynamic response. A filter circuit and a current fast transferring circuit were designed based on a detailed analysis on working process of the arc power sup- ply. According to the requirements and parameters of the arc power supply, and the current response of RL first order circuit, the minimum filter inductances were accurately calculated. Finally, using the model and Matlab, the performance of the arc power supply was simulated and verified, and it meets the design requirement. (authors)

  6. Interaction between supply and end-use

    International Nuclear Information System (INIS)

    Skytte, K.; Noergaard, P.; Togeby, M.

    2005-01-01

    In a future power system with a high proportion of distributed and intermittent generation, it will be difficult and costly to ensure short-term security of supply if demand is unable to react to fluctuations on the supply side. At present, most power consumers in the EU, with the exception of the largest consumers such as energy intensive industries, buy their power on fixed tariffs. Fixed tariffs provide no incentives for consumers to alter their patterns of power consumption. This calls for more interaction between the supply and demand sides, which in turn would allow better matching of demand to intermittent supply. The development of cheap and reliable electronic communication technologies has made this a realistic option, so we are left with the general question of how the demand side can become more active in the future power market. Liberalisation of the wholesale power markets has introduced market-based pricing for the marginal electricity supply. Prices are set hourly, or even more frequently, by reference to the balance between the expected demand and supply at the time. If the expected demand exceeds supply, prices increase until demand falls or more generation comes on line. If supply exceeds demand, prices fall. In this way, market prices are used to determine the balance level between generation and consumption. In liquid markets, the power price is a reliable indicator of the state of the electricity system. Price fluctuations reveal the cost of marginal production capacity; very high prices indicate that capacity is limited compared with demand. At present, it is mostly the generation side that adjust their supply in order to create balance between supply and expected demand. If demand, as well as supply, could respond to price signals from the market, the flexibility of the energy system would increase. This would make it easier to increase the proportion of intermittent renewable energy sources in the system. Demand response (DR) is the term

  7. How the reverse supply chain contributes to a firm’s competitive strategy: a strategic alignment perspective

    DEFF Research Database (Denmark)

    Larsen, Samuel Brüning; Masi, Donato; Jacobsen, Peter

    2017-01-01

    The ongoing transition to a Circular Economy is changing the shape of Supply Chains. They are becoming more ‘Closed-Loop’, combining forward and reverse flows of products and materials. Reverse Supply Chains (RSCs), originally considered as a solution for handling waste or recovering residual value...... seven case studies, focusing on original equipment manufacturers (OEMs), show how the RSC can play a strategic, tactical, or operational role for the firm. The paper applies for the first time the concept of strategic alignment to the RSC and practitioners can use the proposed framework to analyse...

  8. Acceptance test procedure for a portable, self-contained nitrogen supply

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0249 Rev. 1 and ECN 606112. The equipment being tested is a Portable, Self-Contained Nitrogen Supply. The unit was purchased as a Design and Fabrication procurement activity. The Functional Test was written by the Seller and is contained in Appendix A. The Functional test will be performed by the Seller with representatives of the Westinghouse Hanford Company performing inspection and witnessing the functional test at the Seller's location

  9. Tl dosimetry around equipment s for dental radiography

    International Nuclear Information System (INIS)

    Medrano, E.; Robles G, M. A.; Vega C, H. R.; Letechipia de L, C.; Hernandez D, V. M.

    2014-08-01

    The ambient dose equivalent around X-rays units used in dentistry has been measured. The radiation that escapes of the tail stock of the X-rays equipment was also measured, and the dose in the surfaces of a polyethylene spherical mannequin and other of water, used to represent the patient and the operator, respectively. The study was realized with thermoluminescent dosimeters of the type 100. The operation conditions of the X-rays units were varied when the ambient dose equivalent was measured. In the other measurements the equipment s were operated to 70 k Vp and 8 m A. In the ambient dose equivalent was found asymmetry, likewise the due dose to the radiation that escapes of one of tail stocks was also asymmetric. The dose values in the mannequins went minors to the recommended reference values. (Author)

  10. Minimization of Impact from Electric Vehicle Supply Equipment to the Electric Grid Using a Dynamically Controlled Battery Bank for Peak Load Shaving

    Energy Technology Data Exchange (ETDEWEB)

    Castello, Charles C [ORNL

    2013-01-01

    This research presents a comparison of two control systems for peak load shaving using local solar power generation (i.e., photovoltaic array) and local energy storage (i.e., battery bank). The purpose is to minimize load demand of electric vehicle supply equipment (EVSE) on the electric grid. A static and dynamic control system is compared to decrease demand from EVSE. Static control of the battery bank is based on charging and discharging to the electric grid at fixed times. Dynamic control, with 15-minute resolution, forecasts EVSE load based on data analysis of collected data. In the proposed dynamic control system, the sigmoid function is used to shave peak loads while limiting scenarios that can quickly drain the battery bank. These control systems are applied to Oak Ridge National Laboratory s (ORNL) solar-assisted electric vehicle (EV) charging stations. This installation is composed of three independently grid-tied sub-systems: (1) 25 EVSE; (2) 47 kW photovoltaic (PV) array; and (3) 60 kWh battery bank. The dynamic control system achieved the greatest peak load shaving, up to 34% on a cloudy day and 38% on a sunny day. The static control system was not ideal; peak load shaving was 14.6% on a cloudy day and 12.7% on a sunny day. Simulations based on ORNL data shows solar-assisted EV charging stations combined with the proposed dynamic battery control system can negate up to 89% of EVSE load demand on sunny days.

  11. High-Voltage Power Supply System for Laser Isotope Separation

    Energy Technology Data Exchange (ETDEWEB)

    Ketaily, E.C.; Buckner, R.P.; Uhrik, R.L.

    1979-06-26

    This report presents several concepts for Laser High-Voltage Power Supply (HVPS) Systems for a Laser Isotope Separation facility. Selection of equipments and their arrangement into operational systems is based on proven designs and on application concepts now being developed. This report has identified a number of alternative system arrangements and has provided preliminary cost estimates for each. The report includes a recommendation for follow-on studies that will further define the optimum Laser HVPS Systems. Brief descriptions are given of Modulator/Regulator circuit trade-offs, system control interfaces, and their impact on costs.

  12. High-Voltage Power Supply System for Laser Isotope Separation

    International Nuclear Information System (INIS)

    Ketaily, E.C.; Buckner, R.P.; Uhrik, R.L.

    1979-01-01

    This report presents several concepts for Laser High-Voltage Power Supply (HVPS) Systems for a Laser Isotope Separation facility. Selection of equipments and their arrangement into operational systems is based on proven designs and on application concepts now being developed. This report has identified a number of alternative system arrangements and has provided preliminary cost estimates for each. The report includes a recommendation for follow-on studies that will further define the optimum Laser HVPS Systems. Brief descriptions are given of Modulator/Regulator circuit trade-offs, system control interfaces, and their impact on costs

  13. Root cause analysis underscores the importance of understanding, addressing, and communicating cold chain equipment failures to improve equipment performance.

    Science.gov (United States)

    Lennon, Pat; Atuhaire, Brian; Yavari, Shahrzad; Sampath, Vidya; Mvundura, Mercy; Ramanathan, Nithya; Robertson, Joanie

    2017-04-19

    Vaccine cold chain equipment (CCE) in developing countries is often exposed to harsh environmental conditions, such as extreme temperatures and humidity, and is subject to many additional challenges, including intermittent power supply, insufficient maintenance capacity, and a scarcity of replacement parts. Together, these challenges lead to high failure rates for refrigerators, potentially damaging vaccines and adversely affecting immunization coverage. Providing a sustainable solution for improving CCE performance requires an understanding of the root causes of failure. Project teams conducted small-scale studies to determine the root causes of CCE failure in selected locations in Uganda and Mozambique. The evaluations covered 59 failed refrigerators and freezers in Uganda and 27 refrigerators in Mozambique. In Uganda, the vast majority of failures were due to a cooling unit fault in one widely used refrigerator model. In Mozambique, 11 of the 27 problems were attributable to solar refrigerators with batteries that were unable to hold a charge, and another eight problems were associated with a need to adjust thermostat settings. The studies showed that tracking and evaluation of equipment performance and failure can yield important, actionable information for a range of stakeholders, including local CCE technicians, the ministry of health, equipment manufacturers, and international partners such as the United Nations Children's Fund, World Health Organization, and Gavi, the Vaccine Alliance. Collaborative efforts to systematically collect and communicate data on CCE performance and causes of failure will help to improve the efficiency and reach of immunization programs in low- and middle-income countries. Copyright © 2016 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  14. Property, Plant and Equipment disclosure requirements and firm characteristics: the Portuguese Accounting Standardization System

    OpenAIRE

    Botelho, Rafaela; Azevedo, Graça; Costa, Alberto J.; Oliveira, Jonas

    2015-01-01

    In the new Portuguese accounting frame of reference (Portuguese Accounting Standardization System – Sistema de Normalização Contabilística), the issues related to Property, Plant and Equipment assets are dealt with in the Accounting and Financial Reporting Standard (Norma Contabilística de Relato Financeiro – NCRF) 7 (Property, Plant & Equipment). The present study intends to assess the degree of compliance with the disclosure requirements of this accounting standard by Portuguese unlisted co...

  15. Application of quality assurance program to safety related aging equipment or components

    International Nuclear Information System (INIS)

    Papaiya, N.C.

    1990-01-01

    This paper addresses how quality assurance programs and their criteria are applied to safety related and aging equipment or components used in commercial nuclear plant applications. The QA Programs referred to are 10CFR50 Appendix B and EPRI NP-5652. The QA programs as applicable are applied to equipment/component aging qualification, preventive maintenance, surveillance testing and procurement engineering. The intent of this paper is not the technical issues, methods and research of aging. The paper addresses QA program's application to age-related equipment or components in safety related applications. Quality Assurance Program 10CFR50 Appendix B applies to all safety related aging components or equipment related to the qualification program and associated preventive maintenance and surveillance testing programs. Quality Assurance involvement with procurement engineering for age-related commercial grade items supports EPRI NP-5652 and assures that the dedicated OGI is equal to the item purchased as a basic component to 10CFR50 Appendix B requirements

  16. Customer system efficiency improvement assessment: Supply curves for transmission and distribution conservation options

    Energy Technology Data Exchange (ETDEWEB)

    Tepel, R.C.; Callaway, J.W.; De Steese, J.G.

    1987-11-01

    This report documents the results of Task 6 in the Customer System Efficiency Improvement (CSEI) Assessment Project. A principal objective of this project is to assess the potential for energy conservation in the transmission and distribution (TandD) systems of electric utilities in the BPA service area. The scope of this assessment covers BPA customers in the Pacific Northwest region and all non-federal TandD systems, including those that currently place no load on the BPA system. Supply curves were developed to describe the conservation resource potentially available from TandD-system efficiency improvements. These supply curves relate the levelized cost of upgrading existing equipment to the estimated amount of energy saved. Stated in this form, the resource represented by TandD loss reductions can be compared with other conservation options and regional electrical generation resources to determine the most cost-effective method of supplying power to the Pacific Northwest. The development of the supply curves required data acquisition and methodology development that are also described in this report. 11 refs., 11 figs., 16 tabs.

  17. Testing the reliability of supply pipings of the pump-fed power station Markersbach

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, W; Perout, A; Hellwig, K

    1981-01-01

    The leakage tests for the pressurised part of steam raising units is carried out during erection of steam raising units by halogen leak indicators. The effect which is produced by spontaneous change of alkali emission of a glowing anode if it comes into contact with molecules containing halogens is used. The erection leak detection equipment which is independent of the mains supply, works on the principle of high voltage corona discharge. Other equipment is also described briefly. All the equipment described uses dichlorfluormethane (CF/sub 2/Cl/sub 2/) as the halogen test gas - with the commercial name Fridohna 12. The test pressure in the pressurised part of the steam raising unit is 0.5 MPa and the mixing ratio of Fridohna 12 to compressed air is 0.12 kg of Fridohna 12 to 1 cubic metre of atmospheric air. The halogen leak test is superior to the water pressure test.

  18. Waste Handling Equipment Development Test and Evaluation Study

    International Nuclear Information System (INIS)

    R.L. Tome

    1998-01-01

    The purpose of this study is to identify candidate Monitored Geologic Repository (MGR) surface waste handling equipment for development testing. This study will also identify strategies for performing the development tests. Development testing shall be implemented to support detail design and reduce design risks. Development testing shall be conducted to confirm design concepts, evaluate alternative design concepts, show the availability of needed technology, and provide design documentation. The candidate equipment will be selected from MGR surface waste handling equipment that is the responsibility of the Management and Operating Contractor (M and O) Surface Design Department. The equipment identified in this study is based on Viability Assessment (VA) design. The ''Monitored Geologic Repository Test and Evaluation Plan'' (MGR T and EP), Reference 5.1, was used as a basis for this study. The MGR T and EP reflects the extent of test planning and analysis that can be conducted, given the current status of the MGR requirements and latest VA design information. The MGR T and EP supports the appropriate sections in the license application (LA) in accordance with 10 CFR 60.2 1(c)(14). The MGR T and EP describes the following test activities: site characterization to confirm, by test and analysis, the suitability of the Yucca Mountain site for housing a geologic repository; development testing to investigate and document design concepts to reduce risk; qualification testing to verify equipment compliance with design requirements, specifications, and regulatory requirements; system testing to validate compliance with MGR requirements, which include the receipt, handling, retrieval, and disposal of waste; periodic performance testing to verify preclosure requirements and to demonstrate safe and reliable MGR operation; and performance confirmation modeling, testing, and analysis to verify adherence to postclosure regulatory requirements. Development test activities can be

  19. Experts and equipment: The IAEA programme in 1965

    International Nuclear Information System (INIS)

    1965-01-01

    Nearly 100 projects are being assisted by Agency experts and equipment in 38 countries under the 1965 programme to be financed from Agency funds, which the Board of Governors approved at its meeting in February, together with four other countries where projects previously approved extend into 1965. In addition, further work is being financed under the UN Expanded Programme of Technical Assistance, including several important regional projects. Under the Agency's long-term programme, it is desirable that all types of technical assistance, whether training, research, or expert advice, should be combined as far as possible. Each country will therefore be asked, in respect of its 1966 programme, to make its requests for experts, equipment, fellowships, scientific visits and research grants as a single submission. The Agency then prepares a country programme of technical assistance, in collaboration with the Government. The number of requests for experts and equipment continues to grow year by year, and it has not been possible to finance them all. This increase is largely because a number of Member States have now set up research reactors and established a nucleus of laboratories under bilateral arrangements; they then turn to the Agency for assistance in developing their programmes. The estimated cost of experts and equipment being provided from Agency resources is $874 000 in 1965, of which $596 800 is for experts, and $277 200 is for equipment and supplies. The Agency also assists some Member States in making arrangements to receive technical assistance directly from other Member States. The work covers a wide range, with isotopes predominating; about 30 projects deal with production of isotopes, their applications in medicine, agriculture and hydrology, in food preservation and industry. A number of projects are concerned with various aspects of reactor construction and use; others deal with health and safety, instrumentation, special branches of chemistry and

  20. Digitalizing upgrade of the power supplies for the extraction septum magnets in HIRFL-CSR

    International Nuclear Information System (INIS)

    Zhao Jiang; Zhang Huajian; Wu Fengjun; Yuan Zhendong; Chen Youxin; Huang Yuzhen; Gao Daqing

    2014-01-01

    This paper introduces the working principle of the power supplies for the septum magnets in HIRFL-CSR and presents a feasible scheme of digitalizing these power supplies. The scheme employed the SOPC (system-on-a-programmable-chip) technology based on FPGA, the software framework of NIOSII and the polycyclic adjustment algorithm realized by the hardware description language. Then, several key problems that could be encountered in realizing the power supply control algorithm on FPGA were discussed. After the power supplies were upgraded, the beam of HIRFL-CSR was extracted more reliably and the stability of beam spot position at the experimental terminals has been obviously improved. This work would provide a valuable reference for the engineers of digitalizing other magnetic power supplies in HIRFL-CSR and of developing magnetic power supplies for heavy ion cancer therapy. (authors)