WorldWideScience

Sample records for equipment operating patterns

  1. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  2. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  3. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  4. Improving operating room coordination: communication pattern assessment.

    Science.gov (United States)

    Moss, Jacqueline; Xiao, Yan

    2004-02-01

    To capture communication patterns in operating room (OR) management to characterize the information needs of OR coordination. Technological applications can be used to change system processes to improve communication and information access, thereby decreasing errors and adverse events. The successful design of such applications relies on an understanding of communication patterns among healthcare professionals. Charge nurse communication was observed and documented at four OR suites at three tertiary hospitals. The data collection tool allowed rapid coding of communication patterns in terms of duration, mode, target person, and the purpose of each communication episode. Most (69.24%) of the 2074 communication episodes observed occurred face to face. Coordinating equipment was the most frequently occurring purpose of communication (38.7%) in all suites. The frequency of other purposes in decreasing order were coordinating patient preparedness (25.7%), staffing (18.8%), room assignment (10.7%), and scheduling and rescheduling surgery (6.2%). The results of this study suggest that automating aspects of preparing patients for surgery and surgical equipment management has the potential to reduce information exchange, decreasing interruptions to clinicians and diminishing the possibility of adverse events in the clinical setting.

  5. General Guidelines for Remote Operation and Maintenance of Pyroprocess Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, B. S.; Park, H. S.; Lee, H. J.; Choi, C. W.; Lee, J. K

    2007-12-15

    As the pyroprocess handle the high radioactive materials, a high radioactive material handling facility required high safety, radioactive shielding, strict quality control, and the remote handling equipment of high technology. This report describes the guidelines of for pyroprocess based the design guides for radioactive material handling facility and equipment from American Nuclear Society(ANS), design guidelines for remotely maintained equipment from Oak Ridge National Laboratory(ORNL), and the experience of design for ACP equipment installed at the ACPF(Advanced Conditioning Process Facility). The General guidelines in this report are as follows. The General guidelines for remote operation and maintenance of pyroprocess equipment: Pyroprocess, Remote handling equipment for pyroprocess, General guide for remote operation and maintenance, general guidelines for the design of remotely operated and maintained equipment, Estimation and analysis for remote maintenance.

  6. Diagnosis of Equipment Failures by Pattern Recognition

    DEFF Research Database (Denmark)

    Pau, L. F.

    1974-01-01

    The main problems in relation to automatic fault finding and diagnosis in equipments or production systems are discussed: 1) compression of the syndrome and observation spaces for better discrimination between failure modes; 2) simultaneous display of the failure patterns and the failure instants...

  7. Ergonomic requirements for the operation of machines and technical equipment

    Directory of Open Access Journals (Sweden)

    Górny Adam

    2017-01-01

    Full Text Available In order to operate machinery and equipment safely, it is critical for the solutions in place to conform to design-related and operating requirements. Design-related requirements are primarily the responsibility of machine designers/developers and manufacturers. Operating requirements should be satisfied by employers, who are responsible for ensuring safe working conditions for their employees. Under applicable laws, machinery and equipment should be designed, produced and then operated without placing excessive loads on workers and in keeping with machine functionality and intended use. One should also ensure that machinery and equipment can be maintained and adjusted without exposing their operators to hazards. Ergonomic criteria are an integral part of such requirements. They ensure that human users and operators of technical equipment are enabled to function properly. Design-related requirements are viewed as a priority safety consideration. While they facilitate the use of technical tools, the actual safety of employees ultimately depends on the satisfaction of specific requirements during operation.

  8. Integrated logistics management system for operation of machinery and equipment

    Directory of Open Access Journals (Sweden)

    Józef Frąś

    2014-09-01

    Full Text Available Background: The main issue in the operations of machinery and equipment, which is the subject of theoretical and empirical research is to provide high reliability and durability with qualitative post-trade services of machinery and equipment. Quality of service can be achieved through planned maintenance activities supported by computer technology. The article presents the concept of an integrated system of logistics management operation of machinery and equipment, especially special one for stationary transport equipment. At the outset, it emphasized the importance and essence of technological transport and storage systems storage in modern manufacturing enterprise. Then the objective and the method of research have been set. An essential part of deliberations in the article is the concept of integrated logistics management system operation for stationary transport equipment. Authors of this article have presented the results the implementation and operation of the system. The results are presented in a descriptive and graphic form. Methods: The purpose of this article is to present the concept of implementing an integrated logistics management system for operation of stationary transport equipment. It goes through combination of planning, event logging service, warehouse management in the field of spare parts, account and records of the cost of service activities. The paper presents an analysis and evaluation method of brainstorming a new approach to logistics management operation stationary transport equipment. Authors takes into account the specific conditions of use of transport equipment and conduct the service, which have a significant impact on the time and place of cost and service as well. It should be noted that the developed system has been implemented. It was also carried out an assessment of its functionality and efficiency as the new IT tool for logistics management operation. Results and conclusions: The paper presents a new

  9. 30 CFR 57.9102 - Movement of independently operating rail equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of independently operating rail... NONMETAL MINES Loading, Hauling, and Dumping Traffic Safety § 57.9102 Movement of independently operating rail equipment. Movement of two or more pieces of rail equipment operating independently on the same...

  10. 30 CFR 56.9102 - Movement of independently operating rail equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of independently operating rail... MINES Loading, Hauling, and Dumping Traffic Safety § 56.9102 Movement of independently operating rail equipment. Movement of two or more pieces of rail equipment operating independently on the same track shall...

  11. Use of operator-provided, installed C/S equipment in IAEA safeguards

    International Nuclear Information System (INIS)

    Shea, T.; Rundquist, D.; Gaertner, K.; Yellin, E.

    1987-01-01

    Developing solutions for complex safe guards problems in close cooperation with Operators is becoming more common, especially as the IAEA continues to operate under zero-growth limitations. This has in practice taken on various forms; from the extreme case of very specific equipment developed and constructed by the State/Operator for use in only one facility, to the more normal case where only the development is carried out by the State/Operator. This practice has advantages and disadvantages. For example, to ensure that Agency inspections will be carried out in a predictable manner, it will be in the Operator's interest to ensure that any equipment he provides is of the highest quality, meets all national safety requirements, and is installed and maintained in such a manner that it will provide years of service. Agency equipment performs its intended function in a reliable manner, but with very specific, limited applications in mind, improvements in reliability over that obtained with normal Agency equipment are to be expected. Also, the authors experience is that reaching acceptable arrangements for the use of State- of Operator-supplied equipment is often far more straightforward than when arranging to apply Agency equipment

  12. DEVELOPMENT OF OPERATING DRIVE SYSTEMS IN ENGINEERING EQUIPMENT

    Directory of Open Access Journals (Sweden)

    A. A. Kotlobai

    2015-01-01

    Full Text Available Engineering machines being in operational service with military units of  engineer troops are fit to their purpose and their application is relevant in modern conditions. Maintenance of operating conditions in engineering equipment which was produced earlier by the USSR enterprises is considered as a rather complicated task due to lack of spare parts because their production has been discontinued.One of the approaches used for maintenance of engineering equipment combat capabilities is modernization of operating drive systems that presupposes replacement of mechanical systems in working element drives by hydrostatic drives which are realized while using modern element base. Usage of hydraulic units in drive systems being in mass production for replacement of mechanical systems manufactured earlier in small batches makes it possible to reduce labour inputs for maintenance and repair of machines. The paper presents some possibilities for development of operating drive systems in engineering equipment. The proposed approach is given through an example of  engineering obstacle-clearing vehicle (IMR-2M and excavation machines (MDK-3 and MDK-2M.Application of a hydraulic drive in working elements of the excavation machines permits to withdraw from cardan  shafts, a gear box, a rotary gear and an overload clutch. A hydraulic motor of the cutter and thrower drive is mounted  on a working element gearbox. While executing modernization of hydraulic systems in excavation machines a pump unit has been proposed for the cutter and thrower drive which consists of a controlled pump and a system for automatic maintenance of the pump operational parameters. While developing the operating drive systems in engineering equipment in accordance with the proposed requirements it is possible to simplify drive systems of working elements and  ensure reliable machinery operation in the units of engineer troops. 

  13. Equipment nonconformance and degradation: Promptly determining operability and establishing corrective action plans

    International Nuclear Information System (INIS)

    Hoxie, C.L.; Cotton, K.R.; Emch, R.L. Jr.

    1992-01-01

    Nine principles for dealing with degraded and nonconforming equipment are presented and some examples are discussed. The distinction between equipment operability (i.e., capability to perform the safety function) and equipment qualification (conformance to all aspects of the current licensing basis, including codes and standards, design criteria, and commitments) is discussed. The concept of finding reasonable assurance of safety for continued plant operation for equipment not covered by technical specifications is also presented. Degraded or nonconforming equipment must be evaluated for its safety impact and for operability. In all cases, degraded or nonconforming conditions must ultimately be resolved, either through prompt corrective action or through some process of showing that the changed state of the plant is acceptable for continued operation, based on 10 CFR 50.59

  14. Using operational equipment to read accident dosemeters.

    Science.gov (United States)

    Devine, R T; Vigil, M M; Martinez, W A

    2004-01-01

    Analysis of accident dosemeters usually involves the use of laboratory-based counting equipment. Gamma spectrometers are used for indium, copper and gold, and alpha-beta detectors for sulphur. This equipment is usually not easily transported due to the shielding required and the weight and delicacy of the counters. For intercomparison studies that require reading the dosemeters on site, a transportable system is required unless the site operating the study can count samples for all the participants. In the case of an actual accident these systems would have a difficulty in counting a large number of accident dosemeters. In an accident, personnel are usually subdivided according to their level of exposure. Those exposed to higher doses are treated immediately. An alternate system should be made available to handle the dosemeters worn by those personnel are likely to receive lower doses. Improvements in portable operational equipment for gamma and beta monitoring allow their use as spectrometers. Such a system was used for the SILENE intercomparison conducted at IRSN Valduc on 12 June and 19, 2002, and the preliminary results compared well with the other participants.

  15. 14 CFR 91.503 - Flying equipment and operating information.

    Science.gov (United States)

    2010-01-01

    ... Turbine-Powered Multiengine Airplanes and Fractional Ownership Program Aircraft § 91.503 Flying equipment...) Emergency operation of fuel, hydraulic, electrical, and mechanical systems. (2) Emergency operation of...

  16. Comparative survey of site and personnel monitoring characteristics for operation of various types of diagnostic-X ray equipment

    International Nuclear Information System (INIS)

    Lyarskij, P.P.; Zol'nikova, N.I.

    1977-01-01

    Diagnostic X-ray machines in present use at medical facilities differ in design and operating parameters, this diversity producing, in turn, a variety of local radiological situations and levels of personnel exposure. Based on radiological safety characterization of working conditions, the authors present a breakdown of contemporary diagnostic X-ray equipment types, based on detailed examination of each group in terms of their associated site monitoring and dosimetry patterns. The paper reports data on personnel exposure levels not only as a function of equipment design and operating characteristics but also according to types of occupational activities for particular medical personnel groups (radiologists, surgeons, anesthesiologists, etc.). Included are health physics data for domestic and foreign X-ray equipment, levels of local and absorbed doses for radiologists, cardiovascular surgeons, neurosurgeons, urologists, traumatologists, anesthesiologists, etc. Measures are recommended for optimizing their activities from the standpoint of radiation safety. (author)

  17. Criteria for approving equipment for continued operation

    International Nuclear Information System (INIS)

    Narayanan, T.V.

    1993-01-01

    In May 1988, the Pressure Vessel Research Committee (PVRC) of the Welding Research Council (WRC) initiated four projects in support of ASME's efforts to develop Codes and Standards for life prediction and life extension of nuclear and fossil power plant components. These projects are: (1) Criteria for Approving Equipment for Continued Operation (2) Guidelines and Procedures for Evaluating Piping for Continued Operation (3) Nondestructive Evaluation of Material Degradation (4) Operation and Maintenance History and Life Cycle Management. The PVRC awarded a contract to Foster Wheeler Development Corporation to undertake the first of these projects. The specific objective was to develop a program plan that will lead to development of ''Criteria for Approving Equipment for Continued Operation.'' The program is divided into the following four tasks: Task 1: Literature Search; Task 2: Telephone Interview and Consultation; Task 3: Program Plan Development; Task 4: Preparation of a Summary Report. This report is in fulfillment of the above project. As part of this study, the author reviewed about 145 reports, papers and books relating to various aspects of life extension. Various experts were also consulted who are involved in EPRI, NRC, ASME, PVRC, MPC, and utility studies as well as other research projects. The conclusions and recommendations for Code-related activities are summarized

  18. Unresolved Safety Issue A-46 - seismic qualification of equipment in operating plants

    International Nuclear Information System (INIS)

    Anderson, N.

    1985-01-01

    Seismic Qualification of Equipment in Operating Plants was designated as an Unresolved Safety Issue (USI) in December, 1980. The USI A-46 program was developed in early 1981 to investigate the adequacy of mechanical and electrical equipment in operating plants to withstand a safe shutdown earthquake. The approach taken was to develop viable, cost effective alternatives to current seismic qualification licensing requirements which could be applied to operating nuclear power plants. The tasks investigated include: (1) identification of seismic sensitive systems and equipment; (2) assessment of adequacy of existing seismic qualification methods; (3) development and assessment of in-situ test procedures to assist in qualification of equipment; (4) seismic qualification of equipment using seismic experience data; and (5) development of methods to generate generic floor response spectra. Progress to date and plans for completion of resolution are reported

  19. Deep Space Network equipment performance, reliability, and operations management information system

    Science.gov (United States)

    Cooper, T.; Lin, J.; Chatillon, M.

    2002-01-01

    The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.

  20. Operation Procedure of Inspection Equipment for TRISO-coated Fuel Particle

    International Nuclear Information System (INIS)

    Kim, S. H.; Kim, Y. K.; Cho, M. S.; Kim, Y. M.; Park, J. Y.; Kim, W. J.; Jeong, K. C.; Oh, S. C.; Lee, Y. W.

    2007-03-01

    TRISO-coated fuel particle for HTGR(high temperature gas cooled reactor) is composed of fuel kernel and coating layers. The kernel and coated particle are characterized by inspection processes for inspection items such as diameter of kernel, thickness, density and an-isotropy of coating layer. The coating thickness can be nondestructively measured by X-ray inspection equipment. The coating thickness as well as the sphericity can be also measured by optical inspection system as a ceramography method. The an-isotropy can be characterized by photometer. The density of coating layer can be measured by density column. The size and sphericity of particles can be measured by PSA(particle size analyzer). The thermo-chemical characteristics of kernel can be analyzed by TG/DTA(Thermogravimetric/Differential Thermal Analyzer). The inspection objective, equipment composition, operation principle, operation manual for each equipment was described in this operation procedure, which will be used for the characterization of inspection items described above

  1. Remote equipment technology. Final report for GFY 1880

    International Nuclear Information System (INIS)

    Wadekamper, D.C.

    1980-09-01

    An interactive graphics terminal and a desk-top computer were utilized to perform a Computer Aided Remote Maintenance simulation of a hypothetical equipment item. The equipment item included an electrical connection, hydraulic fitting, and simple bolt pattern which were maintained by remote manipulators during the simulation. These remote maintenance operations demonstrated that the Computer Aided Remote Maintenance simulation technology could be extended to complex equipment items. As a result, these equipment items can be evaluated from the standpoint of remote operation and maintenance prior to purchase or installation in a remote processing or cell arrangement

  2. Operational planning optimization of steam power plants considering equipment failure in petrochemical complex

    International Nuclear Information System (INIS)

    Luo, Xianglong; Zhang, Bingjian; Chen, Ying; Mo, Songping

    2013-01-01

    Highlights: ► We develop a systematic programming methodology to address equipment failure. ► We classify different operation conditions into real periods and virtual periods. ► The formulated MILP models guarantee cost reduction and enough operation safety. ► The consideration of reserving operation redundancy is effective. - Abstract: One or more interconnected steam power plants (SPPs) are constructed in a petrochemical complex to supply utility energy to the process. To avoid large economic penalties or process shutdowns, these SPPs should be flexible and reliable enough to meet the process energy requirement under varying conditions. Unexpected utility equipment failure is inevitable and difficult to be predicted. Most of the conventional methods are based on the assumption that SPPs do not experience any kind of equipment failure. Unfortunately, a process shutdown cannot be avoided when equipment fails unexpectedly. In this paper, a systematic methodology is presented to minimize the total cost under normal conditions while reserving enough flexibility and safety for unexpected equipment failure conditions. The proposed method transforms the different conditions into real periods to indicate normal scenarios and virtual periods to indicate unexpected equipment failure scenarios. The optimization strategy incorporating various operation redundancy scheduling, the transition constraints from equipment failure conditions to normal conditions, and the boiler load increase behavior modeling are presented to save cost and guarantee operation safety. A detailed industrial case study shows that the proposed systematic methodology is effective and practical in coping with equipment failure conditions with only few additional cost penalties

  3. The evaluation of equipment and Instrumentation Reliability Factors on Power Reactor

    International Nuclear Information System (INIS)

    Supriatna, Piping; Karlina, Itjeu; Widagdo, Suharyo; Santosa, Kussigit; Darlis; Sudiyono, Bambang; Yuniyanta, Sasongko; Sudarmin

    1999-01-01

    Equipment and instrumentation reliability on type power reactor control room was determined by its pattern and design. the principle of ergonomy applied on equipment and instrumentation layout in this ABWR type reactor are geometric pattern appropriate with economic body motion, average anthropometry data of operator especially operator hand-reach, range of vision, angle of vision, lighting, color arrangement and harmony as will as operator case in operating the equipment system. Limitation criteria of the parameter mentioned above are based on EPRI NP-3659, NURG 0700, and NUREG/CR-3331 documents. Besides that, the (working) physical environment parameter factor of the control room must be designed in order to fulfil the standard criteria of ergonomic condition based on NUREG-0800. The reliability evaluation of equipment and instrumentation system also occurs observed from man machine interaction side which happen between operator and equipment and instrumentation in the ABWR type power reactor control room. From the MMI analysis can be known the working failure possibility which is caused by the operator. The evaluation result of equipment and instrumentation reliability on ABWR type power reactor control room showed that the design of this ABWR control room is good and fulfils the ergonomy standard criteria have been determined

  4. 30 CFR 57.12071 - Movement or operation of equipment near high-voltage powerlines.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement or operation of equipment near high-voltage powerlines. 57.12071 Section 57.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION...-voltage powerlines. When equipment must be moved or operated near energized high-voltage powerlines (other...

  5. Prototype equipment status monitor for plant operational configuration management

    International Nuclear Information System (INIS)

    DeVerno, M.; Trask, D.; Groom, S.

    1998-01-01

    CANDU plants, such as the Point Lepreau GS, have tens of thousands of operable devices. The status of each operable device must be immediately available to plan and execute future changes to the plant. Historically, changes to the plant's operational configuration have been controlled using manual and administrative methods where the status of each operable device is maintained on operational flowsheets located in the work control area of the main control room. The operational flowsheets are used to plan and develop Operating Orders (OOs) or Order-to-Operate (OTOs) and the control centre work processes are used to manage their execution. After performing each OO procedure, the operational flowsheets are updated to reflect the new plant configuration. This process can be very time consuming, and due to the manual processes, can lead to the potential for time lags and errors in the recording of the current plant configuration. Through a cooperative research and development program, Canadian CANDU utilities and Atomic Energy of Canada Limited, the design organization, have applied modern information technologies to develop a prototype Equipment Status Monitor (ESM) to address processes and information flow for efficient operational configuration management. The ESM integrates electronic operational flowsheets, equipment databases, engineering and work management systems, and computerized procedures to assess, plan, execute, track, and record changes to the plant's operational configuration. This directly leads to improved change control, more timely and accurate plant status information, fewer errors, and better decision making regarding future changes. These improvements to managing the plant's operational configuration are essential to increasing plant safety, achieving a high plant availability, and maintaining high capability and capacity factors. (author)

  6. Rules and procedures for the design and operation of hazardous research equipment

    International Nuclear Information System (INIS)

    1978-12-01

    The manual has been prepared for use by research personnel involved in experiments at the Lawrence Berkeley Laboratory. It contains rules and procedures for the design, test, installation, and operation of hazardous research equipment. Sect. I contains such information as responsibility of experimenters for safety, descriptions of the various Laboratory safety organizations, and enumeration of various services available to experimenters at the Laboratory. Sect. II describes specific rules for the setup and operation of experimental equipment at the Laboratory. Sect. III gives detailed design criteria and procedures for equipment frequently encountered in the high energy physics laboratory

  7. Zirconium Recycle Test Equipment for Hot Cell Operations

    International Nuclear Information System (INIS)

    Collins, Emory D.; DelCul, Guillermo Daniel; Spencer, Barry B.; Bradley, Eric Craig; Brunson, Ronald Ray

    2015-01-01

    The equipment components and assembly support work were modified for optimized, remote hot cell operations to complete this milestone. The modifications include installation of a charging door, Swagelok connector for the off-gas line between the reactor and condenser, and slide valve installation to permit attachment/replacement of the product salt collector bottle.

  8. The method for assurance to operational safety of cryogenics equipment through definite maintenance

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2004-01-01

    The present paper reports about a method of ensuring operational safety of cryogenics equipment through specific maintenance measures which imply a definite concept of maintainability and operational reliability, methods of maintenance, necessary logistic and necessary personnel. The stages of the concept should succeed in a logical order and must be based on detailed analyses of the process of maintenance. The method starts from the operation conditions of cryogenic equipment in nuclear regime. Thus maintenance policy must be well defined within the boundaries of the nuclear plant through definition of coherent objectives and responsibility delegation for the personnel implied in maintenance activity. This method ensures performance in maintenance and an efficient feedback from equipment analysis. (author)

  9. Performance Evaluation and Suggestion of Upgraded Fuel Handling Equipment for Operating OPR1000

    International Nuclear Information System (INIS)

    Chang, Sang Gyoon; Hwang, Jeung Ki; Choi, Taek Sang; Na, Eun Seok; Lee, Myung Lyul; Baek, Seung Jin; Kim, Man Su; Kunik, Jack

    2011-01-01

    The purpose of this study is to evaluate the performance of upgraded FHE (Fuel Handling Equipment) for operating OPR 1000 (Optimized Power Reactor) by using data measured during the fuel reloading, and make some suggestions on enhancing the performance of the FHE. The fuel handling equipment, which serves critical processes in the refueling outage, has been upgraded to increase and improve the operational availability of the plant. The evaluation and suggestion of this study can be a beneficial tool related to the performance of the fuel handling equipment

  10. Evaluation of Design Models of Process Equipment for Use in PRIDE: Remote Operability and Maintainability

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Kim, Sung Hyun; Yu, Seung Nam; Lee, Jong Kwang; Park, Byung Suk; Han, Jong Hui; Cho, Il Je; Lee, Han Soo

    2012-01-01

    Process equipment for pyroprocessing are being developed at KAERI (Korea Atomic Energy Research Institute). Those equipment should be operated and maintained in a fully remote manner in the argon gas filled cell of PRIDE (PyRoprocess Integrated inactive DEmonstration facility) at KAERI because direct human access to the in-cell is not possible during an operation due to the high toxicity of the argon gas. To make such process equipment remotely operable and maintainable, their design developments have been tested and evaluated in a simulator before they are constructed. A simulator as a means of evaluating the remote operability and maintainability of the design models of process equipment for pyroprocessing is described, and results of the design models tested and evaluated in a simulator are presented

  11. 30 CFR 56.12071 - Movement or operation of equipment near high-voltage power lines.

    Science.gov (United States)

    2010-07-01

    ...-voltage power lines. 56.12071 Section 56.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... NONMETAL MINES Electricity § 56.12071 Movement or operation of equipment near high-voltage power lines. When equipment must be moved or operated near energized high-voltage powerlines (other than trolley...

  12. 14 CFR 135.165 - Communication and navigation equipment: Extended over-water or IFR operations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation equipment... PERSONS ON BOARD SUCH AIRCRAFT Aircraft and Equipment § 135.165 Communication and navigation equipment... aircraft used for IFR operations is equipped with at least— (i) One marker beacon receiver providing visual...

  13. Design/Operations review of core sampling trucks and associated equipment

    International Nuclear Information System (INIS)

    Shrivastava, H.P.

    1996-01-01

    A systematic review of the design and operations of the core sampling trucks was commissioned by Characterization Equipment Engineering of the Westinghouse Hanford Company in October 1995. The review team reviewed the design documents, specifications, operating procedure, training manuals and safety analysis reports. The review process, findings and corrective actions are summarized in this supporting document

  14. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  15. Advance of Hazardous Operation Robot and its Application in Special Equipment Accident Rescue

    Science.gov (United States)

    Zeng, Qin-Da; Zhou, Wei; Zheng, Geng-Feng

    A survey of hazardous operation robot is given out in this article. Firstly, the latest researches such as nuclear industry robot, fire-fighting robot and explosive-handling robot are shown. Secondly, existing key technologies and their shortcomings are summarized, including moving mechanism, control system, perceptive technology and power technology. Thirdly, the trend of hazardous operation robot is predicted according to current situation. Finally, characteristics and hazards of special equipment accident, as well as feasibility of hazardous operation robot in the area of special equipment accident rescue are analyzed.

  16. 14 CFR 135.167 - Emergency equipment: Extended overwater operations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Emergency equipment: Extended overwater operations. 135.167 Section 135.167 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF...) One CO2 bottle for emergency inflation; (x) One inflation pump; (xi) Two oars; (xii) One 75-foot...

  17. Virtual age model for equipment aging plant based on operation environment and service state

    International Nuclear Information System (INIS)

    Zhang Liming; Cai Qi; Zhao Xinwen; Chen Ling

    2010-01-01

    The accelerated life model based on the operation environment and service state was established by taking the virtual age as the equipment aging indices. The effect of different operation environments and service states on the reliability and virtual age under the continuum operation conditions and cycle operation conditions were analyzed, and the sensitivities of virtual age on operational environments and service states were studied. The results of the example application show that the effect of NPP equipment lifetime and the key parameters related to the reliability can be quantified by this model, and the result is in accordance with the reality.(authors)

  18. 40 CFR 63.5734 - What standards must I meet for resin and gel coat application equipment cleaning operations?

    Science.gov (United States)

    2010-07-01

    ... and gel coat application equipment cleaning operations? 63.5734 Section 63.5734 Protection of... Pollutants for Boat Manufacturing Standards for Resin and Gel Coat Application Equipment Cleaning Operations § 63.5734 What standards must I meet for resin and gel coat application equipment cleaning operations...

  19. Minimum radwaste system to support commercial operation-what equipment can be deferred

    International Nuclear Information System (INIS)

    Marshall, R.W.; Tafazzoli, M.M.

    1984-01-01

    Because of cash flow problems being experienced by utilities as nuclear power stations approach completion, areas of the plant for which the completion of the construction effort could be deferred past commercial operation should be reviewed. The radwaste treatment systems are prime candidates for such a deferral because of the availability, either temporary or permanent, of alternative treatment methods for the waste streams expected to be produced. In order to identify the radwaste equipment, components and associated hardware in the radwaste building which could be deferred past commercial operation, a study was performed by Impell Corporation to evaluate the existing radwaste treatment system and determine the minimum system necessary to support commercial operation of a typical BWR. The study identified the minimum-installed radwaste treatment system which, in combination with portable temporary equipment, would accommodate the waste types and quantities likely to be produced in the first few years of operation. In addition, the minimum-installed system had to be licensable and excessive radiation exposures should not be incurred during the construction of the deferred portions of the system after commercial operation. From this study, it was concluded that a significant quantity of radwaste processing equipment and the associated piping, valves and instrumentation could be deferred. The estimated savings, in construction manhours (excluding field distributables) alone, was over 102,000 M-H

  20. Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual

    International Nuclear Information System (INIS)

    DALE, R.N.

    2000-01-01

    A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O and M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085

  1. Survey of exposure of physiotherapist operators to emissions from microwave and short wave diathermy equipment

    International Nuclear Information System (INIS)

    Coppell, R.B.

    1987-01-01

    An extensive survey of levels of electromagnetic fields in the vicinity of microwave and short wave diathermy equipment is presented and occupational exposure of physiotherapist operators is assessed. There was a good response to mailed questionnaires to 18 hospital boards, 21 private hospitals, and 148 private physiotherapy practices in Christchruch and centres of the north island of New Zealand. Within 34 public hospitals and 57 private practice of those so contacted, who also volunteered to participate, measurements were made in numerous positions about operating equipment. For practical reasons, manufactured phantom sections were substituted for real patients. Levels of microwave power flux density were found to vary according to position and to orientation of equipment and patient phantom. Provided, microwave diathermy equipment is used with reasonable care, excessive exposure of the physiotherapist operator is considered very unlikely. Levels of electric and magnetic field strength squared in the vicinity of simulated body sections under short wave diathermy treatment were found to be highly localised and strongly dependent upon the type of applicator used and the proximity of connecting leads. Operating procedures, including distances of separation, are recommended to protect operators from excessive exposure. (author). 30 refs., 8 tabs., 4 figs., ills

  2. Preliminary evaluation of operational parameters in fixed x-ray diagnostics equipment

    International Nuclear Information System (INIS)

    Bacelar, Alexandre; Oliveira, Sandro Soletti de; Streck, Elaine E.; Furtado, Alvaro Porto Alegre; Pinto, Ana Lucia Acosta

    1998-01-01

    In this work they were appraised 22 fixed X-ray diagnostic equipment belonging to three great medical institutions in Porto Alegre - RS, Brazil, with the purpose of demonstrating the importance of the implementation of a Quality Warranty program, advised by a health physicist, in the performance of these equipment. For so some data of alignment and collimation of the beam, peak tube voltage, tube current, transportable charge and exposition time were collected. The results of the tests showed that in only one of the institutions all the equipment remained in operationally acceptable conditions, with relative percent errors below 10%, concerning to the analyzed parameters. This study also showed that the performance of the equipment of the three analyzed institutions is a direct reflex of the maintenance of a Quality Warranty Program, advised by a qualified professional. (author)

  3. Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual

    Energy Technology Data Exchange (ETDEWEB)

    DALE, R.N.

    2000-05-01

    A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O & M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085.

  4. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  5. General Atomic HTGR fuel reprocessing pilot plant: results of initial sequential equipment operation

    International Nuclear Information System (INIS)

    1978-09-01

    In September 1977, the processing of 20 large high-temperature gas-cooled reactor (LHTGR) fuel elements was completed sequentially through the head-end cold pilot plant equipment. This report gives a brief description of the equipment and summarizes the results of the sequential operation of the pilot plant. 32 figures, 15 tables

  6. Maintenance of electromechanical equipment in quality organization under operating conditions

    International Nuclear Information System (INIS)

    Mercier, J.P.

    1984-01-01

    The paper outlines the principles adopted by the Thermal Production Service of Electricite de France on the basis of the experience of the first years of operation of its 900 MW(e)PWR units for the purpose of improving quality organization in operating conditions in respect of the maintenance of electromechanical safety equipment. This organization is based on application of the usual principles for quality assurance, adapted in accordance with current French regulations. The paper first recalls the now traditional methods of applying the principles of quality organization in the area of equipment maintenance. It then defines particular so-called ''delicate'' activities which, in accordance with the above regulations, are subjected to additional quality organizational procedures; this applies in particular to the area of pre-maintenance preparation and studies and to the control exercised by the French safety authorities over the execution of those activities. The paper explains how the application of the regulations improves maintenance practices compared with standard quality organization. It describes how the attempt to establish a frontier between these two types of activity (current and ''delicate'') has led to the definition of a classification criterion which is technically correct and simple to use and is based on the professional skills of those performing each activity. The paper then describes in greater detail the principal rules for the performance of those tasks which come under the standard organization and those to which more stringent criteria apply. Lastly, it explains the thinking behind equipment surveillance programmes and the analysis of anomalies discovered through surveillance measures or brought to light by operating incidents, the aim of these being to benefit from the experience gained

  7. Construction, assembling and operation of an equipment for sodium purity

    International Nuclear Information System (INIS)

    Becquart, E.T.; Botbol, J.; Echenique, P.N.; Fruchtenicht, F.W.; Gil, D.A.; Perillo, P.; Vardich, R.N.; Vigo, D.E.

    1993-01-01

    The purpose of this work is the production of high purity metallic sodium for bench-scale, research studies. A stainless steel equipment was built and assembled, including high vacuum, heating and cooling systems. It was satisfactorily operated in two successive steps, filtration and vacuum distillation, with a good yield. (Author). 5 refs., 5 figs

  8. Costs and indices for domestic oil and gas field equipment and production operations 1990 through 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-08

    This report presents estimated costs and indice for domestic oil and gas field equipment and production operations for 1990, 1991, 1992, and 1993. The costs of all equipment and serives were those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of oil wells to gas wells. The body of the report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (costs and lease availability) have significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas production equipment and operations.

  9. Costs and indices for domestic oil and gas field equipment and production operations 1990 through 1993

    International Nuclear Information System (INIS)

    1994-01-01

    This report presents estimated costs and indice for domestic oil and gas field equipment and production operations for 1990, 1991, 1992, and 1993. The costs of all equipment and serives were those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of oil wells to gas wells. The body of the report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (costs and lease availability) have significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas production equipment and operations

  10. Environmental and ventilation benefits for underground mining operations using fuel cell powered production equipment

    International Nuclear Information System (INIS)

    Kocsis, C.; Hardcastle, S.

    2007-01-01

    The benefits of replacing diesel engines with fuel cells in mine production equipment were discussed. The paper was part of a multi-year feasibility study conducted to evaluate the use of hydrogen fuel cell-powered equipment to replace diesel engine powered equipment in underground mining operations. The feasibility study demonstrated that fuel cells are capable of eliminating the unwanted by-products of combustion engines. However, the use of fuel cells also reduced the amount of ventilation that mines needed to supply, thereby further reducing energy consumption. This study examined the benefits of replacing diesel engines with fuel cells, and discussed the mitigating qualifiers that may limit ventilation energy savings. Solutions to retaining and maintaining additional ventilation in the event of hydrogen leaks from fuel cell stacks were also investigated. The analyses were conducted on 6 operating mines. Current operating costs were compared with future operating conditions using fuel cell powered production vehicles. Operating costs of the primary ventilation system were established with a mine ventilation simulator. The analysis considered exhaust shaft velocities, heating system air velocities, and levels of silica exposure. Canadian mine design criteria were reviewed. It was concluded that appropriate safeguards are needed along hydrogen distribution lines to lower the impacts of hydrogen leaks. Large financial commitments may also be required to ensure a spark-free environment. 20 refs., 6 tabs., 3 figs

  11. Design and operation of equipment used to develop remote coating capability for HTGR fuel particles

    International Nuclear Information System (INIS)

    Suchomel, R.R.; Stinton, D.P.; Preston, M.K.; Heck, J.L.; Bolfing, B.J.; Lackey, W.J.

    1978-12-01

    Refabrication of HTGR fuels is a manufacturing process that consists of preparation of fuel kernels, application of multiple layers of pyrolytic carbon and silicon carbide, preparation of fuel rods, and assembly of fuel rods into fuel elements. All the equipment for refabrication of 233 U-containing fuel must be designed for completely remote operation and maintenance in hot-cell facilities. Equipment to remotely coated HTGR fuel particles has been designed and operated. Although not all of the equipment development needed for a fully remote coating system has been completed, significant progress has been made. The most important component of the coating furnace is the gas distributor, which must be simple, reliable, and easily maintainable. Techniques for loading and unloading the coater and handling microspheres have been developed. An engineering-scale system, currently in operation, is being used to verify the workability of these concepts. Coating crucible handling components are used to remove the crucible from the furnace, remove coated particles, and exchange the crucible, if necessary. After the batch of particles has been unloaded, it is transferred, weighed, and sampled. The components used in these processes have been tested to ensure that no particle breakage or holdup occurs. Tests of the particle handling system have been very encouraging because no major problems have been encountered. Instrumentation that controls the equipment performed very smoothly and reliably and can be operated remotely

  12. Trend and pattern analyses of operational data from nuclear power plants

    International Nuclear Information System (INIS)

    Amesz, J.

    1990-01-01

    One step towards maximizing the benefits gained from plant operating experience is the establishment of a rigorous scheme of classification and storage of operational data related to equipment failures and/or human errors. The analysis of data thus collected can fall into one of the following two categories: in-depth analysis of individual incidents which are considered to be of major significance from the safety point of view; and trend and pattern analyses of the stored data with the aim of identifying situations that warrant further studies or that require particular attention. In order to perform the second type of analyses, various approaches/systems are being used by organizations with interests in the nuclear power domain. Similar methodologies may be used in general industrial safety as well. For the purpose of facilitating a comparison between the different methods, the OECD/NEA Committee on the Safety of Nuclear Installations (CSNI) decided to organize a specialist meeting jointly with the Commission of the European Communities (CEC) for a systematic and comprehensive review of the matter

  13. 33 CFR 157.150 - Crude Oil Washing Operations and Equipment Manual: Recording information after inspections.

    Science.gov (United States)

    2010-07-01

    ... Equipment Manual: Recording information after inspections. 157.150 Section 157.150 Navigation and Navigable... Vessels Inspections § 157.150 Crude Oil Washing Operations and Equipment Manual: Recording information... machines. (2) Revolutions, number of cycles, and length of cycles of each COW machine. (3) Pressure and...

  14. 78 FR 26110 - Kicking Cars and Going Between Rolling Equipment During Flat Switching Operations

    Science.gov (United States)

    2013-05-03

    ... Cars and Going Between Rolling Equipment During Flat Switching Operations AGENCY: Federal Railroad... occurred during a railroad switching operation that involved a railroad employee kicking cars and... make recommendations to railroads regarding the adoption of car-handling procedures during flat...

  15. RISK ASSESSMENT BY STRUCTURAL ANALYSIS AND VIBRATION MEASUREMENT EQUIPMENT OPERATING AT OIL FACILITIES

    OpenAIRE

    Marius STAN

    2013-01-01

    Vibration analysis applications in operation is one of the diagnostic methods ofoperation of the facility. Analysis of these types of failures indicated the existence of specificfeatures prints and related equipment vibration spectra. Modeling and identification of theseparticular aspects in the spectrum of vibration machines help to control the operation of oilfacilities built safely.

  16. Remotely operated replaceable process equipment

    International Nuclear Information System (INIS)

    Westendorf, H.

    1987-01-01

    The coupling process of pneumatic and electrical auxiliary lines of a pneumatic control pressure line in a large cell of the reprocessing plant is carried out, together with the coupling process of the connecting flange of the process equipment. The coupling places of the auxiliary lines, such as control or supply lines, are laid in the flange parts of the flanges to be connected. The pipe flange on the frame side remains flush with the connecting flange of the process equipment. (DG) [de

  17. Seismic qualification of equipment in operating nuclear power plants: Unresolved Safety Issue A-46

    International Nuclear Information System (INIS)

    Chang, T.Y.

    1987-02-01

    The margin of safety provided in existing nuclear power plant equipment to resist seismically induced loads and perform their intended safety functions may vary considerably, because of significant changes in design criteria and methods for the seismic qualification of equipment over the years. Therefore, the seismic qualification of equipment in operating plants must be reassessed to determine whether requalification is necessary. The objective of technical studies performed under the Task Action Plan A-46 was to establish an explicit set of guidelines and acceptance criteria to judge the adequacy of equipment under seismic loading at all operating plants, in lieu of requiring qualification to the current criteria that are applied to new plants. This report summarizes the work accomplished on USI A-46. In addition, the collection and review of seismic experience data and existing seismic test data are presented. Staff assessment of work accomplished under USI A-46 leads to the conclusion that the use of seismic experience data provides the most reasonable alternative to current qualification criteria. Consideration of seismic qualification by use of experience data was a specific task in USI A-46. Several other A-46 tasks serve to support the use of an experienced data base. The principal technical finding of USI A-46 is that seismic experience data, supplemented by existing seismic test data, applied in accordance with the guidelines developed, can be used to verify the seismic adequacy of mechanical and electrical equipment in operating nuclear plants. Explicit seismic qualification should be required only if seismic experience data or existing test data on similar components cannot be shown to apply

  18. RISK ASSESSMENT BY STRUCTURAL ANALYSIS AND VIBRATION MEASUREMENT EQUIPMENT OPERATING AT OIL FACILITIES

    Directory of Open Access Journals (Sweden)

    Marius STAN

    2013-05-01

    Full Text Available Vibration analysis applications in operation is one of the diagnostic methods ofoperation of the facility. Analysis of these types of failures indicated the existence of specificfeatures prints and related equipment vibration spectra. Modeling and identification of theseparticular aspects in the spectrum of vibration machines help to control the operation of oilfacilities built safely.

  19. Remotely-operated equipment for inspection, measurement and handling

    CERN Document Server

    Bertone, C; CERN. Geneva. TS Department

    2008-01-01

    As part of the application of ALARA radiation dose reduction principles at CERN, inspection, measurement and handling interventions in controlled areas are being studied in detail. A number of activities which could be carried out as remote operations have already been identified and equipment is being developed. Example applications include visual inspection to check for ice formation on LHC components or water leaks, measurement of radiation levels before allowing personnel access, measurement of collimator or magnet alignment, visual inspection or measurements before fire service access in the event of fire, gas leak or oxygen deficiency. For these applications, a modular monorail train, TIM, has been developed with inspection and measurement wagons. In addition TIM provides traction, power and data communication for lifting and handling units such as the remote collimator exchange module and vision for other remotely operated units such as the TAN detector exchange mini-cranes. This paper describes the eq...

  20. Liquid Metal Fast Breeder Reactor plant maintenance and equipment design

    International Nuclear Information System (INIS)

    Swannack, D.L.

    1982-01-01

    This paper provides a summary of maintenance equipment considerations and actual plant handling experiences from operation of a sodium-cooled reactor, the Fast Flux Test Facility (FFTF). Equipment areas relating to design, repair techniques, in-cell handling, logistics and facility services are discussed. Plant design must make provisions for handling and replacement of components within containment or allow for transport to an ex-containment area for repair. The modular cask assemblies and transporter systems developed for FFTF can service major plant components as well as smaller units. The plant and equipment designs for the Clinch River Breeder Reactor (CRBR) plant have been patterned after successful FFTF equipment

  1. 47 CFR 90.475 - Operation of internal transmitter control systems in specially equipped systems.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of internal transmitter control... Control Internal Transmitter Control Systems § 90.475 Operation of internal transmitter control systems in specially equipped systems. (a) An internal transmitter control system need not be designed to meet the...

  2. A study on the operator's communication pattern characteristics under abnormal operating situation of nuclear power plants

    International Nuclear Information System (INIS)

    Kim, S. H.; Park, J.

    2008-01-01

    The quality of a probabilistic safety assessment (PSA) has become more important and a human reliability analysis (HRA) is known as a major contributor to the uncertainty of a PSA. As a part of enhancing the HRA quality, a study was initiated to find out characteristics of communication pattern and to evaluate communication quality of the operators of nuclear power plants. Korea Atomic Energy Research Institute (KAERI) is developing evaluation methods for the effect of human-induced events on risk/performance. This paper describes a study on the operator's communication pattern characteristics under abnormal operating situation of nuclear power plants. The study was carried out in four stages; 1) Video recording 2) Audio scripting 3) Message Classification 4) Communication Pattern Analysis. We recorded eight abnormal simulator training programs from Younggwang nuclear power plant training center. After that we performed message classification and carried out communication pattern analysis. We compared communication patterns of abnormal operating situation with emergency operating situation.As results of analysis, the role of SRO (senior reactor operator) under abnormal operating situation was decreased than the activities under emergency operating situation because each operator (reactor operator, turbine operator, safety supervisor) in main control room (MCR) performs the activity to control by himself with corresponding field engineers with his basic knowledge of the system. On the other hand, the operator's decision making processes and activities under abnormal operating situation were dramatically increased than the emergency operating situation. (authors)

  3. Identification of critical equipment and determination of operational limits in helium refrigerators under pulsed heat load

    Science.gov (United States)

    Dutta, Rohan; Ghosh, Parthasarathi; Chowdhury, Kanchan

    2014-01-01

    Large-scale helium refrigerators are subjected to pulsed heat load from tokamaks. As these plants are designed for constant heat loads, operation under such varying load may lead to instability in plants thereby tripping the operation of different equipment. To understand the behavior of the plant subjected to pulsed heat load, an existing plant of 120 W at 4.2 K and another large-scale plant of 18 kW at 4.2 K have been analyzed using a commercial process simulator Aspen Hysys®. A similar heat load characteristic has been applied in both quasi steady state and dynamic analysis to determine critical stages and equipment of these plants from operational point of view. It has been found that the coldest part of both the cycles consisting JT-stage and its preceding reverse Brayton stage are the most affected stages of the cycles. Further analysis of the above stages and constituting equipment revealed limits of operation with respect to variation of return stream flow rate resulted from such heat load variations. The observations on the outcome of the analysis can be used for devising techniques for steady operation of the plants subjected to pulsed heat load.

  4. Demonstration of remotely operated TRU waste size reduction and material handling equipment

    International Nuclear Information System (INIS)

    Looper, M.G.; Charlesworth, D.L.

    1988-01-01

    The Savannah River Laboratory (SRL) is developing remote size reduction and material handling equipment to prepare 238 Pu contaminated waste for permanent disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The waste is generated at the Savannah River Plant (SRP) from normal operation and decommissioning activity and is retrievably stored onsite. A Transuranic Waste Facility for preparing, size-reducing, and packaging this waste for disposal is scheduled for completion in 1995. A cold test facility for demonstrating the size reduction and material handling equipment was built, and testing began in January 1987. 9 figs., 1 tab

  5. Costs and indices for domestic oil and gas field equipment and production operations 1994 through 1997

    International Nuclear Information System (INIS)

    1998-03-01

    This report presents estimated costs and cost indices for domestic oil and natural gas field equipment and production operations for 1994, 1995, 1996, and 1997. The costs of all equipment and services are those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of the total number of oil wells to the total number of gas wells. The detail provided in this report is unavailable elsewhere. The body of this report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (compliance costs and lease availability) have a significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas equipment and production operations

  6. Costs and indices for domestic oil and gas field equipment and production operations, 1992--1995

    International Nuclear Information System (INIS)

    1996-08-01

    This report presents estimated costs and cost indices for domestic oil and natural gas field equipment and production operations for 1992, 1993, 1994, and 1995. The costs of all equipment and services are those in effect during June of each year. The sum (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measured do not capture changes in industry-wide costs exactly because of annual variations in the ratio of the total number of oil wells to the total number of gas wells. The detail provided in this report is unavailable elsewhere. The body of this report contains summary tables, and the appendices contain detailed tables

  7. Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

    Science.gov (United States)

    Chakrabarti, Suman

    2010-01-01

    the design of the equipment can make such operational effort unnecessary. Finally, this paper addresses processes of tying resources to a timeline of tasks performed in ground operations: this enables various overarching analyses, e.g., a summarization of all resources used for a given piece of equipment. Quality Control of data will also be discussed: importing and exporting data from product teams, including spreadsheets-todatabase or data exchange between databases.

  8. Regulatory analysis for resolution of Unresolved Safety Issue A-46, seismic qualification of equipment in operating plants

    International Nuclear Information System (INIS)

    Chang, T.Y.; Anderson, N.R.

    1987-02-01

    The margin of safety provided in existing nuclear power plant equipment to resist seismically induced loads and perform required safety functions may vary considerably, because of significant changes in design criteria and methods for the seismic qualification of equipment over the years. Therefore, the seismic qualification of equipment in operating plants must be reassessed to determine whether requalification is necessary. The objective of technical studies performed under Task Action Plan A-46 was to establish an explicit set of guidelines and acceptance criteria to judge the adequacy of equipment under seismic loading at all operating plants, in lieu of requiring these plants to meet the criteria that are applied to new plants. This report presents the regulatory analysis for Unresolved Safety Issue (USI) A-46. It includes: Statement of the Problem; the Objective of USI A-46; a Summary of A-46 Tasks; a Proposed Implementation Procedure; a Value-Impact Analysis; Application of the Backfit Rule; 10 CFR 50.109; Implementation; and Operating Plants To Be Reviewed to USI A-46 Requirements

  9. A typewriting system operated by head movements, based on home-computer equipment

    NARCIS (Netherlands)

    Heuvelmans, A.M.F.; Mélotte, H.E.M.; Neve, J.J.

    1990-01-01

    For persons who cannot move their hands and legs we have designed a relatively inexpensive typewriting system which can be operated by movements of the head. The typewriter is made up of commercially available home computer equipment - i e, a computer including monitor and printer and a headset

  10. Operating experience with remote handling equipment in a typical hot facility

    International Nuclear Information System (INIS)

    Ravishankar, A.; Balasubramanian, G.R.

    1990-01-01

    Large number of articulated arm manipulators and special purpose remote tools have been used either alone or in combination in a recent campaign of treatment of irradiated J rods of CIRUS for separation of 233 U. These equipments were used for operations such as remote maintenance of centrifuge, centrifugal extractor, direct sampling, assistance for sample conveying operations etc. Paper discusses problems encountered in using articulated arm manipulators of type MAll,AMl and how they were overcome. Problems encountered in use of model-8 manipulator for chopper maintenence in a mockup facility are also highlighted. (author). 4 figs., 1 tab

  11. Monitoring equipment environment during nuclear plant operation at Salem and Hope Creek generating stations

    International Nuclear Information System (INIS)

    Blum, A.; Smith, R.J.

    1991-01-01

    Monitoring of environmental parameters has become a significant issue for operating nuclear power plants. While the long-term benefits of plant life extension programs are being pursued with comprehensive environmental monitoring programs, the potential effect of local hot spots at various plant locations needs to be evaluated for its effect on equipment degradation and shortening of equipment qualified life. A significant benefit can be experienced from temperature monitoring when a margin exists between the design versus actual operating temperature. This margin can be translated into longer equipment qualified life and significant reduction in maintenance activities. At PSE and G, the immediate need for monitoring environmental parameters is being accomplished via the use of a Logic Beach Bitlogger. The Bitlogger is a portable data loggings system consisting of a system base, input modules and a communication software package. Thermocouples are installed on selected electrical equipment and cables are run from the thermocouples to the input module of the Bitlogger. Temperature readings are taken at selected intervals, stored in memory, and downloaded periodically to a PC software program, i.e., Lotus. The data is formatted into tabular or graphical documents. Because of their versatility, Bitloggers are being used differently at the authors Nuclear facility. At the Salem Station (2 Units-4 loop Westinghouse PWR), a battery powered, fully portable, calibrated Bitlogger is located in an accessible area inside Containment where it monitors the temperature of various electrical equipment within the Pressurizer Enclosure. It is planned that close monitoring of the local hot spot temperatures in this area will allow them to adjust and reconcile the environmental qualification of the equipment

  12. Method of operator safety assessment for underground mobile mining equipment

    Science.gov (United States)

    Działak, Paulina; Karliński, Jacek; Rusiński, Eugeniusz

    2018-01-01

    The paper presents a method of assessing the safety of operators of mobile mining equipment (MME), which is adapted to current and future geological and mining conditions. The authors focused on underground mines, with special consideration of copper mines (KGHM). As extraction reaches into deeper layers of the deposit it can activate natural hazards, which, thus far, have been considered unusual and whose range and intensity are different depending on the field of operation. One of the main hazards that affect work safety and can become the main barrier in the exploitation of deposits at greater depths is climate threat. The authors have analysed the phenomena which may impact the safety of MME operators, with consideration of accidents that have not yet been studied and are not covered by the current safety standards for this group of miners. An attempt was made to develop a method for assessing the safety of MME operators, which takes into account the mentioned natural hazards and which is adapted to current and future environmental conditions in underground mines.

  13. Method of operator safety assessment for underground mobile mining equipment

    Directory of Open Access Journals (Sweden)

    Działak Paulina

    2018-01-01

    Full Text Available The paper presents a method of assessing the safety of operators of mobile mining equipment (MME, which is adapted to current and future geological and mining conditions. The authors focused on underground mines, with special consideration of copper mines (KGHM. As extraction reaches into deeper layers of the deposit it can activate natural hazards, which, thus far, have been considered unusual and whose range and intensity are different depending on the field of operation. One of the main hazards that affect work safety and can become the main barrier in the exploitation of deposits at greater depths is climate threat. The authors have analysed the phenomena which may impact the safety of MME operators, with consideration of accidents that have not yet been studied and are not covered by the current safety standards for this group of miners. An attempt was made to develop a method for assessing the safety of MME operators, which takes into account the mentioned natural hazards and which is adapted to current and future environmental conditions in underground mines.

  14. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  15. Operation and technology development of the radioactive xenon and krypton detection equipment

    International Nuclear Information System (INIS)

    Lee, Wanno; Choi, Sangdo; Ji, Youngyong; Lim, Jong Myoung; Cho, Young Hyun; Kang, Han Beul; Lee, Hoon; Kang, Moon Ja; Choi, Kun Sik

    2013-03-01

    Operation and technology development of the radioactive xenon and krypton detection equipment - Advancement, independence of operation technology for BfS-IAR system(the simultaneous analysis of xenon and krypton) installed after North Korea nuclear tests in 2006 and establishment of background base-line for xenon and krypton radioactivity. - Enhanced detection and analysis capabilities for neighborhood nuclear activities through advanced research of noble gas detection technology. Results of the Project · The operation of xenon and krypton analysis system (BfS-IAR) · Operation of fixed adsorption system. · Operation of portable adsorption system · Exercise of emergency response and proficiency test with SAUNA. · Measurement of noble gas background at specific region in Korea. - Radioxenon levels at Dongdu Cheon is approximately 1.6 mBq/m 3 · Development of automation filling system for absorber cooling

  16. 21 CFR 111.117 - What quality control operations are required for equipment, instruments, and controls?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for equipment, instruments, and controls? 111.117 Section 111.117 Food and Drugs FOOD AND DRUG ADMINISTRATION... and Process Control System: Requirements for Quality Control § 111.117 What quality control operations...

  17. SPECIFIC DEGRADATION STRUCTURE FEATURES AND MECHANICAL PROPERTIES OF FURNACE AND HEAT POWER EQUIPMENT ELEMENTS AFTER LONG-TERM OPERATION

    Directory of Open Access Journals (Sweden)

    F. I. Panteleenko

    2012-01-01

    Full Text Available The paper presents results of investigations on structure and mechanical properties of technological equipment elements made of heat-resistant steels. A scale of chrome and molybdenum steel microstructure degradation based on evaluation of  coagulated carbide size and material mechanical properties (a point from 0-operation without time limits, up to 4-operation prohibition has been proposed in the paper. It has been  established that an analysis of  steel microstructure directly on equipment elements by means of a portable microscope is an efficient express method for evaluation of equipment condition and structures due to control of material structure degradation rate of a diagnosed object.

  18. Using ADA Tasks to Simulate Operating Equipment

    Science.gov (United States)

    DeAcetis, Louis A.; Schmidt, Oron; Krishen, Kumar

    1990-01-01

    A method of simulating equipment using ADA tasks is discussed. Individual units of equipment are coded as concurrently running tasks that monitor and respond to input signals. This technique has been used in a simulation of the space-to-ground Communications and Tracking subsystem of Space Station Freedom.

  19. A typewriting system operated by head movements, based on home-computer equipment.

    Science.gov (United States)

    Heuvelmans, A M; Mélotte, H E; Neve, J J

    1990-06-01

    For persons who cannot move their hands and legs we have designed a relatively inexpensive typewriting system which can be operated by movements of the head. The typewriter is made up of commercially available home computer equipment - i e, a computer including monitor and printer and a headset replacing the mouse. A user-friendly software program has been designed to replace the mouse button and to make this equipment act as a typewriter with simple text-editing features. Some ergonomics aspects of the typewriter set-up and the results of an evaluation of the typewriter by two patients suffering from amyotrophic lateral sclerosis (ALS) are given. Several factors relevant to the design, construction, evaluation and application of the typewriter are discussed.

  20. Methodology for Risk Analysis of Dam Gates and Associated Operating Equipment Using Fault Tree Analysis

    National Research Council Canada - National Science Library

    Patev, Robert C; Putcha, Chandra; Foltz, Stuart D

    2005-01-01

    .... This report summarizes research on methodologies to assist in quantifying risks related to dam gates and associated operating equipment, and how those risks relate to overall spillway failure risk...

  1. 14 CFR 121.349 - Communication and navigation equipment for operations under VFR over routes not navigated by...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation equipment for... § 121.349 Communication and navigation equipment for operations under VFR over routes not navigated by... receiver providing visual and aural signals; and (iii) One ILS receiver; and (3) Any RNAV system used to...

  2. Worst-case prediction of normal operating containment temperatures for environmentally qualified equipment

    International Nuclear Information System (INIS)

    Krasnopoler, M.J.; Sundergill, J.E.

    1991-01-01

    Due to issues raised in NRC Information Notice No. 87-65, a southern US nuclear plant was concerned about thermal aging of environmentally qualified (EQ) equipment located in areas of elevated containment temperatures. A method to predict the worst-case monthly temperatures at various zones in the containment and calculate the qualified life using this monthly temperature was developed. Temperatures were predicted for twenty locations inside the containment. Concern about the qualified life of EQ equipment resulted from normal operating temperatures above 120F in several areas of the containment, especially during the summer. At a few locations, the temperature exceeded 140F. Also, NRC Information Notice No. 89-30 reported high containment temperatures at three other nuclear power plants. The predicted temperatures were based on a one-year containment temperature monitoring program. The monitors included permanent temperature monitors required by the Technical Specifications and temporary monitors installed specifically for this program. The temporary monitors were installed near EQ equipment in the expected worst-case areas based on design and operating experience. A semi-empirical model that combined physical and statistical models was developed. The physical model was an overall energy balance for the containment. The statistical model consists of several linear regressions that conservatively relate the monitor temperatures to the bulk containment temperature. The resulting semi-empirical model predicts the worst-case monthly service temperatures at the location of each of the containment temperature monitors. The monthly temperatures are the maximum expected because they are based on the historically worst-case atmospheric data

  3. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  4. Process pump operating problems and equipment failures, F-Canyon Reprocessing Facility, Savannah River Plant

    International Nuclear Information System (INIS)

    Durant, W.S.; Starks, J.B.; Galloway, W.D.

    1987-02-01

    A compilation of operating problems and equipment failures associated with the process pumps in the Savannah River Plant F-Canyon Fuel Reprocessing Facility is presented. These data have been collected over the 30-year operation of the facility. An analysis of the failure rates of the pumps is also presented. A brief description of the pumps and the data bank from which the information was sorted is also included

  5. Design and realization of a novel multitask TT&C operation pattern

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    With the sharp increase of China's in-orbit spacecraft and the constraint TT&C resources, a mathematical model for optimal TT&C resource allocation is proposed, and the TT&C facility remote monitoring function is designed to achieve the multitask operation pattern under the unified management of the network management center. With this pattern, the TT&C network management and the spacecraft management are separated, which is quite different from the previous pattern. Further, a novel spacecraft TT&C technique based on spacecraft control language is developed, and the telecommanding pattern is designed to address the spacecraft operation problems. The engineering application shows that this pattern fundamentally improves the TT&C network capability, increases the resource efficiency, and satisfies the efficient, accurate, and flexible operation of spacecraft.

  6. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  7. A SVDD and K-Means Based Early Warning Method for Dual-Rotor Equipment under Time-Varying Operating Conditions

    Directory of Open Access Journals (Sweden)

    Zhinong Jiang

    2018-01-01

    Full Text Available Under frequently time-varying operating conditions, equipment with dual rotors like gas turbines is influenced by two rotors with different rotating speeds. Alarm methods of fixed threshold are unable to consider the influences of time-varying operating conditions. Hence, those methods are not suitable for monitoring dual-rotor equipment. An early warning method for dual-rotor equipment under time-varying operating conditions is proposed in this paper. The influences of time-varying rotating speeds of dual rotors on alarm thresholds have been considered. Firstly, the operating conditions are divided into several limited intervals according to rotating speeds of dual rotors. Secondly, the train data within each interval is processed by SVDD and the allowable ranges (i.e., the alarm threshold of the vibration are determined. The alarm threshold of each interval of operating conditions is obtained. The alarm threshold can be expressed as a sphere, whose controlling parameters are the coordinate of the center and the radius. Then, the cluster center of the test data, whose alarm state is to be judged, can be extracted through K-means. Finally, the alarm state can be obtained by comparing the cluster center with the corresponding sphere. Experiments are conducted to validate the proposed method.

  8. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  9. Ammunition Peculiar Equipment (APE) 1995, NIR Propellant Analyzer, to MIL-STD-398, Military Standard Shields, Operational for Ammunition Operations, Criteria for Design of and Tests for Acceptance

    National Research Council Canada - National Science Library

    2003-01-01

    ... (SJMAC-DEM) to test the Ammunition Peculiar Equipment (APE) 1995 NIR Propellant Analyzer, to MIL-STD-398, "Military Standard Shields, Operational for Ammunition Operations, Criteria for Design of and Tests for Acceptance...

  10. HTGR fuel reprocessing pilot plant: results of the sequential equipment operation

    International Nuclear Information System (INIS)

    Strand, J.B.; Fields, D.E.; Kergis, C.A.

    1979-05-01

    The second sequential operation of the HTGR fuel reprocessing cold-dry head-end pilot plant equipment has been successfully completed. Twenty standard LHGTR fuel elements were crushed to a size suitable for combustion in a fluid bed burner. The graphite was combusted leaving a product of fissile and fertile fuel particles. These particles were separated in a pneumatic classifier. The fissile particles were fractured and reburned in a fluid bed to remove the inner carbon coatings. The remaining products are ready for dissolution and solvent extraction fuel recovery

  11. Air quality on biomass harvesting operations

    Science.gov (United States)

    Dana Mitchell

    2011-01-01

    The working environment around logging operations can be very dusty. But, air quality around logging operations is not well documented. Equipment movements and trafficking on the landing can cause dust to rise into the air. The addition of a biomass chipper creates different air flow patterns and may stir up additional dust. This project addresses two topics related to...

  12. A safety equipment list for rotary mode core sampling systems operation in single shell flammable gas tanks

    International Nuclear Information System (INIS)

    SMALLEY, J.L.

    1999-01-01

    This document identifies all interim safety equipment to be used for rotary mode core sampling of single-shell flammable gas tanks utilizing Rotary Mode Core Sampling systems (RMCS). This document provides the safety equipment for RMCS trucks HO-68K-4600, HO-68K-4647, trucks three and four respectively, and associated equipment. It is not intended to replace or supersede WHC-SD-WM-SEL-023, (Kelly 1991), or WHC-SD-WM-SEL-032, (Corbett 1994), which classifies 80-68K-4344 and HO-68K-4345 respectively. The term ''safety equipment'' refers to safety class (SC) and safety significant (SS) equipment, where equipment refers to structures, systems and components (SSC's). The identification of safety equipment in this document is based on the credited design safety features and analysis contained in the Authorization Basis (AB) for rotary mode core sampling operations in single-shell flammable gas tanks. This is an interim safety classification since the AB is interim. This document will be updated to reflect the final RMCS equipment safety classification designations upon completion of a final AB which will be implemented with the release of the Final Safety Analysis Report (FSAR)

  13. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  14. Equipment-related incidents in the operating room: an analysis of occurrence, underlying causes and consequences for the clinical process

    NARCIS (Netherlands)

    Wubben, I.; van Manen, Jeanette Gabrielle; van den Akker, B.J.; Vaartjes, S.R.; van Harten, Willem H.

    2010-01-01

    Background: Equipment-related incidents in the operating room (OR) can affect quality of care. In this study, the authors determined the occurrence and effects on the care process in a large teaching hospital. - Methods: During a 4-week period, OR nurses reported equipment-related incidents during

  15. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  16. Process plant equipment operation, control, and reliability

    CERN Document Server

    Holloway, Michael D; Onyewuenyi, Oliver A

    2012-01-01

    "Process Plant Equipment Book is another great publication from Wiley as a reference book for final year students as well as those who will work or are working in chemical production plants and refinery…" -Associate Prof. Dr. Ramli Mat, Deputy Dean (Academic), Faculty of Chemical Engineering, Universiti Teknologi Malaysia "…give[s] readers access to both fundamental information on process plant equipment and to practical ideas, best practices and experiences of highly successful engineers from around the world… The book is illustrated throughout with numerous black & white p

  17. Operation modes research of liquefied natural gas storages as a part of the ground complexes equipment

    Directory of Open Access Journals (Sweden)

    N. S. Korolev

    2014-01-01

    Full Text Available The use of the Liquefied Natural Gas (LNG in the space-rocket equipment is motivated by some advantages. That is why a lot of tests and works are actively carried out now on rocket engines using liquefied natural gas.To provide the engine tests and subsequent rocket complex operation a creation of LNG storages is demanded as a part of ground processing equipment and support for their safe operation conditions.One of LNG danger factor is its low boiling temperature, and also changing the condition, density and LNG boiling temperature at storage due to evaporation of light component, namely methane. At refill of the storages having fuel remains with a new LNG portion these factors can lead to formation of the stratified macro-layers and cause a mode of the intensive mixing that is called "rollover", with almost instant evaporation of LNG big mass and sharp pressure boost, capable to result in the storage distraction with catastrophic effects.The work objectives are formulated such as a technique development for forecasting of the LNG parameters in operating storages including the rollover mode, a comparison of calculated results of the LNG parameters with the experimental data, and a definition of possible recommendations for safe operation of LNG storages as a part of the ground complexes equipment.The paper reviews 12 publications concerning the issues and proceeding processes at operation of LNG storages, including the rollover mode.To verify the reliability of process simulation results in the LNG, represented in models by the binary methane-ethane mixture the calculated values have been compared with the experimental data for a LNG storage mode in the reservoir of a ground test complex.The reliability of developed models of the heat-mass-exchange processes in stratified on density and temperature in LNG storage with emergence of conditions for the rollover mode has been verified by comparing the settlement characteristics to the published

  18. Optimization of the operating conditions of gas-turbine power stations considering the effect of equipment deterioration

    Science.gov (United States)

    Aminov, R. Z.; Kozhevnikov, A. I.

    2017-10-01

    In recent years in most power systems all over the world, a trend towards the growing nonuniformity of energy consumption and generation schedules has been observed. The increase in the portion of renewable energy sources is one of the important challenges for many countries. The ill-predictable character of such energy sources necessitates a search for practical solutions. Presently, the most efficient method for compensating for nonuniform generation of the electric power by the renewable energy sources—predominantly by the wind and solar energy—is generation of power at conventional fossil-fuel-fired power stations. In Russia, this problem is caused by the increasing portion in the generating capacity structure of the nuclear power stations, which are most efficient when operating under basic conditions. Introduction of hydropower and pumped storage hydroelectric power plants and other energy-storage technologies does not cover the demand for load-following power capacities. Owing to a simple design, low construction costs, and a sufficiently high economic efficiency, gas turbine plants (GTPs) prove to be the most suitable for covering the nonuniform electric-demand schedules. However, when the gas turbines are operated under varying duty conditions, the lifetime of the primary thermostressed components is considerably reduced and, consequently, the repair costs increase. A method is proposed for determination of the total operating costs considering the deterioration of the gas turbine equipment under varying duty and start-stop conditions. A methodology for optimization of the loading modes for the gas turbine equipment is developed. The consideration of the lifetime component allows varying the optimal operating conditions and, in some cases, rejecting short-time stops of the gas turbine plants. The calculations performed in a wide range of varying fuel prices and capital investments per gas turbine equipment unit show that the economic effectiveness can

  19. Modelling and design of undercarriage components of large-scale earthmoving equipment in tar sand operations

    Energy Technology Data Exchange (ETDEWEB)

    Szymanski, J.; Frimpong, S.; Sobieski, R. [Alberta Univ., Edmonton, AB (Canada). Centre for Advanced Energy and Minerals Research

    2004-07-01

    This presentation described the fundamental and applied research work which has been carried out at the University of Alberta's Centre for Advanced Energy and Minerals Research to improve the undercarriage elements of large scale earthmoving equipment used in oil sands mining operations. A new method has been developed to predict the optimum curvature and blade geometry of earth moving equipment such as bulldozers and motor graders. A mathematical relationship has been found to approximate the optimum blade shape for reducing cutting resistance and fill resistance. The equation is a function of blade geometry and soil properties. It is the first model that can mathematically optimize the shape of a blade on earth moving equipment. A significant saving in undercarriage components can be achieved from reducing the amount of cutting and filling resistance for this type of equipment working on different soils. A Sprocket Carrier Roller for a Tracked Vehicle was also invented to replace the conventional cylindrical carrier roller. The new sprocket type carrier roller offers greater support for the drive track and other components of the undercarriage assembly. A unique retaining pin assembly has also been designed to detach connecting disposable wear parts from earthmoving equipment. The retaining pin assembly is easy to assemble and disassemble and includes reusable parts. 13 figs.

  20. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  1. Plutonium Immobilization Can Loading Equipment Review

    International Nuclear Information System (INIS)

    Kriikku, E.; Ward, C.; Stokes, M.; Randall, B.; Steed, J.; Jones, R.; Hamilton, L.

    1998-05-01

    This report lists the operations required to complete the Can Loading steps on the Pu Immobilization Plant Flow Sheets and evaluates the equipment options to complete each operation. This report recommends the most appropriate equipment to support Plutonium Immobilization Can Loading operations

  2. Diagnostic x-ray equipment and its use

    International Nuclear Information System (INIS)

    1993-01-01

    The guide contains the requirements for the use, structure and operation of diagnostic x-ray equipment necessary to ensure the radiation safety of workers and patients. The guide is intended for the party responsible for operating the x-ray units, the staff operating, installing and maintaining x-ray examination equipment, and companies manufacturing and selling such equipment. Special requirements for mammographic and dental x-ray equipments are given in separate ST guides. (5 refs., 1 figs., 2 tabs.)

  3. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  4. A safety equipment list for rotary mode core sampling systems operation in single shell flammable gas tanks; TOPICAL

    International Nuclear Information System (INIS)

    SMALLEY, J.L.

    1999-01-01

    This document identifies all interim safety equipment to be used for rotary mode core sampling of single-shell flammable gas tanks utilizing Rotary Mode Core Sampling systems (RMCS). This document provides the safety equipment for RMCS trucks HO-68K-4600, HO-68K-4647, trucks three and four respectively, and associated equipment. It is not intended to replace or supersede WHC-SD-WM-SEL-023, (Kelly 1991), or WHC-SD-WM-SEL-032, (Corbett 1994), which classifies 80-68K-4344 and HO-68K-4345 respectively. The term ''safety equipment'' refers to safety class (SC) and safety significant (SS) equipment, where equipment refers to structures, systems and components (SSC's). The identification of safety equipment in this document is based on the credited design safety features and analysis contained in the Authorization Basis (AB) for rotary mode core sampling operations in single-shell flammable gas tanks. This is an interim safety classification since the AB is interim. This document will be updated to reflect the final RMCS equipment safety classification designations upon completion of a final AB which will be implemented with the release of the Final Safety Analysis Report (FSAR)

  5. 30 CFR 250.602 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.602 Section 250.602... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.602 Equipment movement. The movement of well-workover rigs and related equipment on and off a platform or from well to well on...

  6. 30 CFR 250.502 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.502 Section 250.502... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion Operations § 250.502 Equipment movement. The movement of well-completion rigs and related equipment on and off a platform or from well to well...

  7. Non-destructive testing of a NPP's metallic equipment during operation

    International Nuclear Information System (INIS)

    Brodskij, B.R.; Monina, Eh.F.

    1977-01-01

    Some nondestructive testing methods and facilities currently used in the USSR and overseas to remotely control the quality of a NPPs metallic equipment during operation are reviewed. The ultrasonic and γ scanning devices designed to verify the integrity of nuclear reactor pressure vessels and piping weldments are considered. The acoustic emission techniques, ultrasonic holography and routine ultrasonic fault detection are acknowledged the most promising and safe when applied to reactor vessels. On the other hand, the radiographic methods are pointed out not to quarantee the identification of a flaw. There is also a description of a container designed to maintain and repair a nuclear reactor in the highly radioactive environment. The increased interest of foreign firms towards acoustic emission techniques is stressed

  8. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  9. Application of ann-based decision making pattern recognition to fishing operations

    Energy Technology Data Exchange (ETDEWEB)

    Akhlaghinia, M.; Torabi, F.; Wilton, R.R. [University of Regina, Saskatchewan (Canada). Faculty of Engineering. Dept. of Petroleum Engineering], e-mail: Farshid.Torabi@uregina.ca

    2010-10-15

    Decision making is a crucial part of fishing operations. Proper decisions should be made to prevent wasted time and associated costs on unsuccessful operations. This paper presents a novel model to help drilling managers decide when to commence and when to quit a fishing operation. A decision making model based on Artificial Neural Network (ANN) has been developed that utilizes Pattern Recognition based on 181 fishing incidents from one of the most fish-prone fields of the southwest of Iran. All parameters chosen to train the ANN-Based Pattern Recognition Tool are assumed to play a role in the success of the fishing operation and are therefore used to decide whether a fishing operation should be performed or not. If the tool deems the operation suitable for consideration, a cost analysis of the fishing operation can then be performed to justify its overall cost. (author)

  10. The Inspection Process of the Army Reset Program for Equipment for Units Returning from Operation Iraqi Freedom

    National Research Council Canada - National Science Library

    2008-01-01

    The subject of this report directly applies to the work of DoD civilian and military personnel responsible for the reset of equipment provided to the warfighter deployed in support of Operation Iraqi Freedom...

  11. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  12. Remotely operated replaceable process equipment. Fernbedient austauschbare Prozessapparatur

    Energy Technology Data Exchange (ETDEWEB)

    Westendorf, H.

    1987-07-23

    The coupling process of pneumatic and electrical auxiliary lines of a pneumatic control pressure line in a large cell of the reprocessing plant is carried out, together with the coupling process of the connecting flange of the process equipment. The coupling places of the auxiliary lines, such as control or supply lines, are laid in the flange parts of the flanges to be connected. The pipe flange on the frame side remains flush with the connecting flange of the process equipment.

  13. Basis and algorithms applied in modern neutron flux monitoring equipment for WWER. Some results of its operation

    International Nuclear Information System (INIS)

    Alpatov, A. M.; Kamyshan, A. N.; Louzhnov, A. M.; Sokolov, I. V.

    2007-01-01

    The report presents the principle of operation and description of equipment complex for monitoring, control and protection by power, period, reactivity and local parameters of the core of WWER type reactor. The use in NFME of programmed computing means permitted on basis of signals from ex-core neutron detectors of working range, distributed over IC channel height, to realize operative non-inertia monitoring of mean axial power distribution shape in the core and its main characteristics (axial offset and axial non-uniformity coefficient). With regard for this and due to the use of information on position of control banks and on coolant temperature in the reactor vessel downcomer the equipment for power correction, eliminating the influence of the above factors on resulting signal and permitting to increase significantly the accuracy of power monitoring, was designed(Authors)

  14. NRC Information Notice No. 93-01: Accuracy of motor-operated valve diagnostic equipment manufactured by Liberty Technologies

    International Nuclear Information System (INIS)

    Grimes, B.K.

    1993-01-01

    Most licensees rely on MOV diagnostic equipment to provide information on the thrust delivered by the motor actuator in opening or closing its valve. The various types of MOV diagnostic equipment estimate valve stem thrust using different parameters, such as displacement of the spring pack or strain in the stem, mounting bolts, or yoke. Liberty Technologies has developed MOV diagnostic equipment, referred to as the Valve Operation Test and Evaluation System (VOTES), that estimates the thrust needed to open or close a valve based on strain of the valve yoke. The VOTES equipment derives thrust from yoke strain that has been calibrated to stem thrust using measured diametral strain of the valve stem and nominal engineering material properties. On October 2, 1992, Liberty Technologies notified the NRC that it had determined that two new factors can affect the thrust values obtained with its equipment. Those factors involve (1) the possible use of improper stem material constants and (2) the failure to account for a torque effect when the VOTES equipment is calibrated by measuring strain in the threaded portion of the valve stem. Liberty Technologies provided information on performing manual calculations to address these factors and stated that its new software, Version 2.3, assists in performing corrections to the thrust data

  15. Temperature effects on particulate emissions from DPF-equipped diesel trucks operating on conventional and biodiesel fuels

    Science.gov (United States)

    Two diesel trucks equipped with a particulate filter (DPF) were tested at two ambient temperatures (70oF and 20oF), fuels (ultra low sulfur diesel (ULSD) and biodiesel (B20)) and operating loads (a heavy and light weight). The test procedure included three driving cycles, a cold ...

  16. Effect of health education based on BASNEF pattern on use of personal protective respiratory equipment in Ahvaz carbon block factory workers, 2009

    Directory of Open Access Journals (Sweden)

    M Solhi

    2012-11-01

    Full Text Available   Background and aims: Respiratory diseases due to work with 50 million annually incidence included one third of all occupational diseases and it is one of the main causes of absenteeism from work in workers. Some occupational diseases can be prevented with personal protective equipment. BASNEF model is one of the effective health education and safety training models for workers. The aim of this study was to determine the effect of educational intervention based on BASNEF pattern on increasing the use of personal protective respiratory equipment among carbon black factory workers , where many air pollutants such as carbon block exists. Methods: In this study the intervention curriculum based on BASNEF pattern administrated on 100 (experimental and control Ahvaz carbon block factory workers. Data were collected by questionnaires. The data were analyzed by Independent T, χ square and Pearson correlation co- efficient using SPSS version16.   Results : After the intervention, the mean scores of knowledge, attitude, intention, and enabling factors showed significant increase in experimental group in comparison of control group (p<0.00001. In addition, the mean score of subjective norms in experimental and control groups showed no significant differences. Conclusion: The educational program based on BASNEF pattern was effective in improving the use of respiratory personal protective equipment in Ahvaz carbon block factory workers 

  17. Environmental Monitoring Techniques and Equipment related to the installation and operation of Marine Energy Conversion Systems

    International Nuclear Information System (INIS)

    Scanu, Sergio; Carli, Filippo Maria; Piermattei, Viviana; Bonamano, Simone; Paladini de Mendoza, Francesco; Marcelli, Marco; Peviani, Maximo Aurelio; Dampney, Keith; Norris, Jennifer

    2015-01-01

    Results of activities under project Marine Renewables Infrastructure Network for Emerging Energy Technologies (MaRINET) are reported, which led to DEMTE, a database, created on the basis of standardized monitoring of the marine environment during installation, operation and decommissioning of Marine Energy Conversion Systems. Obtained with the consortium partners’ available techniques and equipment, the database shows that such instruments cover all identified marine environmental compartments, despite the lack of underwater vehicles and the reduced skills in using satellite technologies. These weaknesses could be overcome by an accurate planning of equipment, techniques and knowledge sharing. The approach here presented also leads to an effective analysis even in non-marine contexts

  18. Network effects in the operation of electrical equipment; Efectos de la red en la operacion del equipo electrico

    Energy Technology Data Exchange (ETDEWEB)

    Garcia T, Arturo; Rosales S, Inocente; Garcia P, Job; Ruiz F, L. Ivan; Robles P, Edgar [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2005-07-01

    In the nineties, the Instituto de Investigaciones Electricas (IIE) Electrical Equipment Management (GEE) was restricted to make the diagnosis of generators, transformers, switch boards and cables, without considering the global operating conditions. With the experience acquired in different services it was verified that, inclusively when this equipment is correctly designed, it can be subjected to unfavorable operative conditions, which causes an accelerated deterioration to the degree of producing a fault. In agreement with this, the GEE settled down new line of development named Analysis of the network effect on the electrical equipment, that analyzes the behavior of the equipment originated by work abnormal causes, including the network configuration effect. [Spanish] En la decada de los noventa, la Gerencia de Equipos Electricos (GEE) del IIE se limitaba a realizar el diagnostico de generadores, transformadores, tableros de distribucion y cables, sin considerar las condiciones globales de operacion. Con la experiencia adquirida en diferentes servicios se comprobo que, inclusive cuando estos equipos esten correctamente disenados, pueden verse sometidos a condiciones de operacion desfavorables, lo que ocasiona un deterioro acelerado al grado de producir una falla. De acuerdo con esto, la GEE establecio una nueva linea de desarrollo de nominada Analisis del efecto de la red en los equipos electricos, que analiza el comportamiento de los equipos originado por causas anormales de trabajo, incluido el efecto de la configuracion de la red.

  19. Standard operational radiation protection instructions for process instrumentation and control engineering applying radiometric equipment containing sealed sources

    International Nuclear Information System (INIS)

    1989-01-01

    According to article 16(3) of the Ordinance on the Implementation of Atomic Safety and Radiation Protection of 11 October 1984, operational radiation protection instructions have to be worked out for each type of nuclear energy application. Based on the valid legal provisions of the GDR and on experience and knowledge gained in practice, the most important operational instructions and procedures for the operation of radiometric equipment containing sealed sources were compiled. The example should enable the management to make the instructions directly applicable and, if necessary, to modify or supplement them

  20. Effectiveness of personal protective equipment: Relevance of dermal and inhalation exposure to chlorpyrifos among pest control operators

    NARCIS (Netherlands)

    Jagt, K. van der; Tielemans, E.; Links, I.; Brouwer, D.; Hemmen, J. van

    2004-01-01

    This study assessed the effectiveness of a custom fit personal protective equipment (PPE) program aimed at reducing occupational exposure to pesticides. The intervention study was carried out on 15 pest control operators (PCOs) during mixing/loading and application of chlorpyrifos. Each worker was

  1. Use of eye tracking equipment for human reliability analysis applied to complex system operations

    International Nuclear Information System (INIS)

    Pinheiro, Andre Ricardo Mendonça; Prado, Eugenio Anselmo Pessoa do; Martins, Marcelo Ramos

    2017-01-01

    This article will discuss the preliminary results of an evaluation methodology for the analysis and quantification of manual character errors (human), by monitoring cognitive parameters and skill levels in the operation of a complex control system based on parameters provided by a eye monitoring equipment (Eye Tracker). The research was conducted using a simulator (game) that plays concepts of operation of a nuclear reactor with a split sample for evaluation of aspects of learning, knowledge and standard operating within the context addressed. bridge operators were monitored using the EYE TRACKING, eliminating the presence of the analyst in the evaluation of the operation, allowing the analysis of the results by means of multivariate statistical techniques within the scope of system reliability. The experiments aim to observe state change situations such as stops and scheduled departures, incidents assumptions and common operating characteristics. Preliminary results of this research object indicate that technical and cognitive aspects can contribute to improving the reliability of the available techniques in human reliability, making them more realistic both in the context of quantitative approaches to regulatory and training purposes, as well as reduced incidence of human error. (author)

  2. Use of eye tracking equipment for human reliability analysis applied to complex system operations

    Energy Technology Data Exchange (ETDEWEB)

    Pinheiro, Andre Ricardo Mendonça; Prado, Eugenio Anselmo Pessoa do; Martins, Marcelo Ramos, E-mail: andrericardopinheiro@usp.br, E-mail: eugenio.prado@labrisco.usp.br, E-mail: mrmatins@usp.br [Universidade de Sao Paulo (LABRISCO/USP), Sao Paulo, SP (Brazil). Lab. de Análise, Avaliação e Gerenciamento de Risco

    2017-07-01

    This article will discuss the preliminary results of an evaluation methodology for the analysis and quantification of manual character errors (human), by monitoring cognitive parameters and skill levels in the operation of a complex control system based on parameters provided by a eye monitoring equipment (Eye Tracker). The research was conducted using a simulator (game) that plays concepts of operation of a nuclear reactor with a split sample for evaluation of aspects of learning, knowledge and standard operating within the context addressed. bridge operators were monitored using the EYE TRACKING, eliminating the presence of the analyst in the evaluation of the operation, allowing the analysis of the results by means of multivariate statistical techniques within the scope of system reliability. The experiments aim to observe state change situations such as stops and scheduled departures, incidents assumptions and common operating characteristics. Preliminary results of this research object indicate that technical and cognitive aspects can contribute to improving the reliability of the available techniques in human reliability, making them more realistic both in the context of quantitative approaches to regulatory and training purposes, as well as reduced incidence of human error. (author)

  3. Segmentation of turbo generator and reactor coolant pump vibratory patterns: a syntactic pattern recognition approach

    International Nuclear Information System (INIS)

    Tira, Z.

    1993-02-01

    This study was undertaken in the context of turbogenerator and reactor coolant pump vibration surveillance. Vibration meters are used to monitor equipment condition. An anomaly will modify the signal mean. At the present time, the expert system DIVA, developed to automate diagnosis, requests the operator to identify the nature of the pattern change thus indicated. In order to minimize operator intervention, we have to automate on the one hand classification and on the other hand, detection and segmentation of the patterns. The purpose of this study is to develop a new automatic system for the segmentation and classification of signals. The segmentation is based on syntactic pattern recognition. For the classification, a decision tree is used. The signals to process are the rms values of the vibrations measured on rotating machines. These signals are randomly sampled. All processing is automatic and no a priori statistical knowledge on the signals is required. The segmentation performances are assessed by tests on vibratory signals. (author). 31 figs

  4. Development of a standard operating procedure for mammography equipment used in calibration of ionized chambers

    International Nuclear Information System (INIS)

    Rodrigues, Yklys Santos; Potiens, Maria da Penha Albuquerque

    2011-01-01

    Mammography is one widely used technique in the detection of breast cancer. In order to optimize the results achieving better images with lower dose rates, a quality assurance programme must be applied to the equipment. Some control tests use ionization chambers to measure air kerma and other quantities. These tests can only be reliable if the ionization chambers used on them are correctly calibrated. In the present work, it was developed a standard operating procedure (SOP) for quality control tests in a commercial mammography equipment installed in the Calibration Laboratory (LCI) at IPEN - Brazilian Institute for energy and nuclear research). Seven tests were performed in the equipment: Tube voltage and exposition time accuracy and reproducibility, linearity and reproducibility of Air kerma and Half Value Layer (HVL). Then, it was made a measurement of the air kerma in the mammography equipment, using a reference ionization chamber with traceability to a primary laboratory in Germany (Physikalisch-Technische Bundesanstalt - PTB), that was later compared with the air kerma measured in an industrial irradiator. This industrial X-ray generator was recently used in the implementation of X-radiation Standards beams, mammography level, following the Standard IEC 61267. The HVL values varied from 0.36 (25kV) to 0.41 mmA1 (35kV), and the measured air kerma rates were between 9.78 and 17.97 mGy/min. (author)

  5. Present and future of cutting equipment; Setsudan kiki no genjo to tenbo

    Energy Technology Data Exchange (ETDEWEB)

    Nakagawa, K. [Koike Sanso Kogyo Co. Ltd., Tokyo (Japan)

    1998-04-01

    This paper describes thermal cutting equipment. Thermal cutting equipment is classified into gas, plasma and laser cutting equipment. Based on the level of automation, the gas cutting equipment has been developed in the order of manual, automatic, eye-tracer, and NC cutters. For recent eye-tracer, paper pattern is inputted in a computer and repeatedly traced. For NC cutting equipment, automatic gas flow rate setting device and sensor for tracing nozzle height are installed. Oxygen plasma cutter is used for cutting soft steel materials. Simplified systems with current below 100 A are mainly used. High-speed cutting is conducted by NC control. Problems of life-time of electrode tips, load of workers, cutting performance, and penetration at corners have been solved. For laser cutter, NC control is also adopted. Since there are no short life-time consumables and conditions can be automatically set, the laser cutter has been put into practice as unmanned equipment. Problems of cutting speed and processing speed have been solved. Gas cutting with multi-blowpipes and unmanned operation of laser cutting are most useful for reducing the cost. 2 figs., 3 tabs.

  6. Remote handling equipment for CANDU retubing

    International Nuclear Information System (INIS)

    Crawford, G.S.; Lowe, H.

    1993-01-01

    Numet Engineering Ltd. has designed and supplied remote handling equipment for Ontario Hydro's retubing operation of its CANDU reactors at the Bruce Nuclear Generating Station. This equipment consists of ''Retubing Tool Carriers'' an'' Worktables'' which operate remotely or manually at the reactor face. Together they function to transport tooling to and from the reactor face, to position and support tooling during retubing operations, and to deliver and retrieve fuel channels and channel components. This paper presents the fundamentals of the process and discusses the equipment supplied in terms of its design, manufacturing, components and controls, to meet the functional and quality requirements of Ontario Hydro's retubing process. (author)

  7. The impact of operating heavy equipment vehicles on lower back disorders.

    Science.gov (United States)

    Waters, Thomas; Genaidy, Ash; Barriera Viruet, Heriberto; Makola, Mbulelo

    2008-05-01

    Literature reviews examining the relationship between heavy equipment vehicle (HEV) operation and the development of musculoskeletal disorders have generally been qualitative in nature and have not employed an evidence-based assessment procedure. This research determines the extent to which whole-body vibration/shock and working postures are associated with lower back and neck disorders among HEV operators, while accounting for individual (i.e. age, gender, prior history of back or neck disorders) and occupational (i.e. material handling, climatic conditions, psychosocial factors) confounders. Published articles were obtained from a search of electronic databases and from bibliographies in the identified articles. A critical appraisal of these articles was conducted using an epidemiological appraisal instrument (Genaidy et al. 2007). The meta-analysis was conducted using statistical techniques employing fixed-effect and random-effect models. Eighteen articles reporting observational studies satisfied the inclusion criteria adopted for this research. The methodological qualities of the published studies ranged from marginal to average. The meta-relative risk was found to be 2.21, indicating that operators exposed to driving HEVs are at more than twice the risk of developing lower back pain in comparison to those not exposed to driving HEVs. Therefore, it seems possible that there is a causal relationship between working as a HEV operator and development of lower back disorders. Prospective cohort studies are urgently needed to confirm the outcomes of this evidence-based methodology (based in part on the meta-analysis) and the biological plausibility should be further explored. The reported findings point to a need for improved ergonomic design of HEVs.

  8. Seismic qualification of equipment in operating nuclear power plants. Unresolved safety issue A-46, draft report for comment

    International Nuclear Information System (INIS)

    Chang, T.Y.

    1985-08-01

    The margin of safety provided in existing nuclear power plant equipment to resist seismically induced loads and perform their intended safety functions may vary considerably, because of significant changes in design criteria and methods for the seismic qualification of equipment over the years. Therefore, the seismic qualification of equipment in operating plants should be reassessed to determine whether requalification is necessary. The objective of technical studies performed under the Task Action Plan A-46 was to establish an explicit set of guidelines and acceptance criteria to judge the adequacy of equipment under seismic loading at all operating plants, in lieu of requiring qualification to the current criteria that are applied to new plants. This report summarizes the work accomplished on USI A-46 by the Nuclear Regulatory Commission staff and its contractors, Idaho National Engineering Laboratory, Southwest Research Institute, Brookhaven National Laboratory, and Lawrence Livermore National Laboratory. In addition, the collection and review of seismic experience data by the Seismic Qualification Utility Group and the review and recommendations of a group of seismic consultants, the Senior Seismic Review Advisory Panel, are presented. Staff assessment of work accomplished under USI A-46 leads to the conclusion that the use of seismic experience data provides the most reasonable alternative to current qualification criteria. Consideration of seismic qualification by use of experience data was a specific task in USI A-46. Several other A-46 tasks serve to support the use of an experience data base

  9. Radioactive decontamination of equipment

    International Nuclear Information System (INIS)

    1982-03-01

    After a recall of some definitions relating to decontamination techniques and of the regulation into effect, the principles to be respected to arrange rationally work zones are quoted while insisting more particularly on the types of coatings which facilitate maintenance operations and the dismantling of these installations. Then, the processes and equipments to use in decontamination units for routine or particular operations are described; the list of recommended chemical products to decontaminate the equipment is given. The influence of these treatments on the state and the duration of life of equipments is studied, and some perfectible methods are quoted. In the appendix, are given: the limits of surface contamination accepted in the centers; a standard project which defines the criteria of admissible residual contamination in wastes considered as cold wastes; some remarks on the interest that certain special ventilation and air curtain devices for the protection of operators working on apparatus generating contaminated dusts [fr

  10. Airflow patterns in complex workplaces

    International Nuclear Information System (INIS)

    Mishima, J.; Selby, J.M.; Lynch, T.P.; Langer, G.; Vallario, E.J.

    1987-01-01

    There are many considerations in obtaining an accurate evaluation of aerosols. One aspect that has been neglected is the study of airflow patterns within the workplace. In many nuclear facilities, the operations performed required extensive equipment (e.g., glove boxes, piping) that create complex arrangements of physical barriers to flow. To provide samples of the airborne materials, particularly particles, knowledge of these complex airflow patterns is required for sampler placement. Recent studies have shown that materials introduced into the air flow within a workplace act as plumes embedded in major airflow streams. Portions of the plumes can recycle through the ventilated area, be lost to dead air pockets, or exhaust through unusual, unexpected outlets. Unusual flow patterns are observed even in relatively uncomplicated arrangements of equipment. This behavior must be factored into sampling/monitoring programs for evaluation of the airborne hazard to personnel within the workplace consistent with the objective of the program. Other factors that also must be considered to provide valid samples of airborne particulate materials are objectives of the sampling program, characteristics of the airborne particulate materials, nonsegregatory transport for the extracted materials, and requirements for the measurement techniques used

  11. DWPF liquid sample station: Status of equipment development

    International Nuclear Information System (INIS)

    Caplan, J.R.

    1987-01-01

    This report summarizes operating experience and equipment status of the DWPF liquid sample cell. Operation hours to date, results of equipment inspections and problems encountered and their solutions are discussed. An equipment and instrumentation status updating DPST-85-592, DWPF LIQUID SAMPLE CELL MOCK-UP, is presented. Remaining development items are also outlined

  12. Experience in performing trends and patterns analysis of nuclear power plant operational data

    International Nuclear Information System (INIS)

    Novak, T.M.; Williams, M.H.; Dennig, R.L.

    1990-01-01

    The Office for Analysis and Evaluation of Operational Data (AEOD) of the U.S. Nuclear Regulatory Commission (USNRC) has conducted a formal trends and patterns program since 1982. Since that time, the methods and end products of the program have evolved through experience and changes in the environment for trends and patterns analysis, i.e., increasing regulatory emphasis on operations and balance of plant performance, emergence of performance indicators, the availability of personal computer hardware and software to perform analysis, and changes in the information reported to the USNRC. This paper discusses the technical milestones of the AEOD trends and patterns program in terms of: 1) Sources of operational data, e.g., pre- and post- 1984 Licensee Event Reports, NPRDS, 2) Data storage and retrieval, e.g., Sequence Coding and Search System (SCSS), 3) Statistical methods, e.g., contingency table analysis, 4) Types of results. The paper summarizes the major lessons learned in the process of implementing a trends and patterns program and outlines future direction

  13. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  14. 14 CFR 135.175 - Airborne weather radar equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...

  15. Remote operational trials with the ITER FDR divertor handling equipment

    International Nuclear Information System (INIS)

    Irving, M.; Baldi, L.; Benamati, G.; Galbiati, L.; Giacomelli, S.; Lorenzelli, L.; Micciche, G.; Muro, L.; Polverari, A.; Palmer, J.; Martin, E.

    2003-01-01

    The ITER divertor test platform (DTP) located at ENEA's Research Centre in Brasimone, Italy is a full-scale mock-up of a 72 deg. arc of the ITER 1998 vessel divertor region--the result of a major initiative over the period 1996-2000. Since the implementation of this facility, the design of the ITER vessel--and therefore much of the remote maintenance equipment--has changed substantially. However, the nature and principles of the remote handling equipment are still very similar, and hence many valuable lessons can yet be learned from the existing equipment for the future. In particular, true remote handling tests of the major maintenance subsystems were seen as an important step in determining their suitability for ITER. This paper describes and documents a series of three, discrete, remote-handling trials carried out using most of the major DTP subsystems, and presents an overview of the conclusions and suggestions for future development of ITER cassette remote handling equipment

  16. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    International Nuclear Information System (INIS)

    Yin, S.C.L.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios

  17. Detection of Equipment Faults Before Beam Loss

    CERN Document Server

    Galambos, J.

    2016-01-01

    High-power hadron accelerators have strict limits on fractional beam loss. In principle, once a high-quality beam is set up in an acceptable state, beam loss should remain steady. However, in practice, there are many trips in operational machines, owing to excessive beam loss. This paper deals with monitoring equipment health to identify precursor signals that indicate an issue with equipment that will lead to unacceptable beam loss. To this end, a variety of equipment and beam signal measurements are described. In particular, several operational examples from the Spallation Neutron Source (SNS) of deteriorating equipment functionality leading to beam loss are reported.

  18. 14 CFR 125.223 - Airborne weather radar equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...

  19. [Analysis and evaluation of the visual effort in remote-control public traffic operators working with computer-based equipments].

    Science.gov (United States)

    Gullà, F; Zambelli, P; Bergamaschi, A; Piccoli, B

    2007-01-01

    The aim of this study is the objective evaluation of the visual effort in 6 public traffic controllers (4 male, 2 female, mean age 29,6), by means of electronic equipment. The electronic equipment quantify the observation distance and the observation time for each controller's occupational visual field. The quantification of these parameters is obtained by the emission of ultrasound at 40 KHz from an emission sensor (placed by the VDT screen) and the ultrasound reception by means of a receiving sensor (placed on the operator's head). The travelling time of the ultrasound (US), as the air speed is known and costant (about 340 m/s), it is used to calculate the distance between the emitting and the receiving sensor. The results show that the visual acuity required is of average level, while accommodation's and convergence's effort vary from average to intense (depending on the visual characteristics of the operator considered), ranging from 26,41 and 43,92% of accommodation and convergence available in each operator. The time actually spent in "near observation within the c.v.p." (Tscr) was maintained in a range from 2h 54' and 4h 05'.

  20. The Patterns Of Surgical Thyroid Diseases And Operative Treatment ...

    African Journals Online (AJOL)

    The Patterns Of Surgical Thyroid Diseases And Operative Treatment. In Gondar College of Medical sciences, North-western Ethiopia. Abebe B. M.D. Lecturer and General practitioner,. Girmaye T. M.D. Assistant professor of surgery,. Mensur 0. M.D. Assistant professor of surgery,. Sentayehu T. M.D. General practitioner,.

  1. 30 CFR 72.520 - Diesel equipment inventory.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Diesel equipment inventory. 72.520 Section 72... Mines § 72.520 Diesel equipment inventory. (a) The operator of each mine that utilizes diesel equipment underground, shall prepare and submit in writing to the District Manager, an inventory of diesel equipment...

  2. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  3. An on-line monitoring system for navigation equipment

    Science.gov (United States)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  4. Extension of operational systems in computers of common use for application in systems for experimental equipment control

    International Nuclear Information System (INIS)

    Demidov, M.A.; Makarov, V.V.; Solov'ev, G.N.

    1985-01-01

    The problems of constructing specialized software for large complexes of experimental equipment and its functioning with serial operating systems (OS) are discussed. The main concepts being the base of dispatching software construction (an applied program package) extending the ES OS potentialities being used in the IHEP system for automatic data acquisition and accelerator control are considered

  5. 14 CFR 121.605 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in § 121...

  6. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  7. Nuclear Technology. Course 32: Nondestructive Examination (NDE) Techniques II. Module 32-4, Operation of Magnetic Particle Test Equipment.

    Science.gov (United States)

    Groseclose, Richard

    This fourth in a series of six modules for a course titled Nondestructive Examination (NDE) Techniques II describes the specific technique variables and options which are available to the test technician, provides instructions for selecting and operating the appropriate test equipment, describes physical criteria for detectable discontinuities,…

  8. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  9. Design, implementation and functional aspects of the control and instrumentation systems of computerised remote operated sludge lancing equipment

    International Nuclear Information System (INIS)

    Aparna, J.; Mehra, K.S.; Sharma, B.S.V.G.; Mohan, L.R.

    2005-01-01

    The computerised and remote operated sludge lancing equipment (SLE) uses high velocity narrow water jets for dislodging and removal of hard and strongly adhesive sludge from the secondary side tube sheet of mushroom type steam generators of Indian PHWRs. During the years of plant operation, corrosion products and other solids deposit in the form of sludge on the tube sheet of steam generators. The sludge formation not only affects adversely the steam generator performance but also diminishes its service life if left unchecked

  10. Influence of Cast Iron Structure on the Glassmold Equipment Operational Defects

    Directory of Open Access Journals (Sweden)

    I. O. Leushin

    2015-01-01

    Full Text Available The growing demand for glass packaging contributes to the increase in production capacity of glass-container plants. Their equipment (cast iron glass-forming sets operates in continuous mode under complex cyclic thermal loads, which lead to the formation of operational defects on the working surfaces of details: graphite falling, cracks, oxidation, etc. Particular influence on the formation of these defects renders the microstructure of the material at the time of installation of details on the line.The article identifies the causes for formation of operational defects, formulates the ways to remedy them and prevent their occurrence.The authors studied details made from grey cast iron with flake and spherical forms of graphite. It is found that in the process of exploitation of the material is greatly reducing its hardness, strength, resistance to oxidation through of graphitization processes, chemical interaction of glass and iron, shock loads working edges. It is proved that the choice of initial microstructure of cast iron (the metal base, the graphite form, the presence of structural-free cementite exercises a determining influence on the durability of the mold tooling. The article proposes differential (layered arrangement of the graphite phase of cast iron in the alloy matrix (ferrite. This arrangement of high-carbon phase can simultaneously increase the thermal and oxidation resistance of the material. The formation of a layered structure of iron is produced by the intensification of the processes of alloying, modifying and directional freezing the melt.These data can be used to select the material of details by manufacturers glass-molds tooling.

  11. Practices of prolongation of the I and C equipment lifetime

    International Nuclear Information System (INIS)

    Samoylov, O.B.; Pronin, V.S.; Savelov, I.D.; Bogomazov, V.A.; Drumov, V.V.; Chudin, A.G.

    2000-01-01

    The lifetime of nuclear power plants (NPP) always exceeds the operational time of Instrumentation and Control (I and C) systems. Ageing of I and C equipment in NPPs have many aspects. Research of these aspects is being performed in OKB Mechanical Engineering. Under condition of fast development of I and C systems and applying more stringent safety requirements, modernization of the equipment irrespective of its operational condition is getting important. However, an equipment of I and C systems operated in Russia was designed and manufactured applying highest requirements for a reliability of their work during its whole operational time. Therefore, in many cases it is not necessary to replace them in spite of expiration of their specified lifetime. During operation this equipment is maintained in a proper operation condition by a special service procedures stipulated by its development. When the equipment lifetime approaches to its end, lifetime extension for the certain period should be considered. (author)

  12. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  13. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  14. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  15. Riser equipment decontamination engineering task plan

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  16. Progress report of the critical equipment monitoring system

    International Nuclear Information System (INIS)

    Pantis, M.J.

    1984-01-01

    The Philadelphia Electric Company has contracted with Energy Data Systems to develop a Critical Equipment Monitoring System for its Peach Bottom Nuclear Plant. This computerized system is designed to acquire and maintain accurate and timely status information on plant equipment. It will provide auditable record of plant and equipment transactions. Positive equipment identification and location will be provided. Errors in complex logical checking will be minimized. This system should reduce operator loading and improve operator communicatin with the plant personnel. Phase I of this system was installed at Peach Bottom Nuclear Station May 1982. It provides the necessary hardware and software to do check-off lists on critical plant systems. This paper describes some of the start-up and operational problems encountered

  17. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  18. Electronic equipment for spectrometric data processing

    International Nuclear Information System (INIS)

    Antonov, L.J.; Trenev, A.M.; Todorova, E.I.; Dimitrov, V.D.

    1978-01-01

    Electronic equipment carrying out logical operations and a full set of the arithmetic operations was developed for spectrometric data processing. The flowsheet of the computing part of the device, made on the basis of a specialized integral circuit, is given. The device includes input registers, multiplexor, matrix commutator, arithmetic unit and indication unit. The equipment is rated to carry out calculations according to comparatively complex formulae in several seconds

  19. Sodium cleaning from sodium contaminated components and operation for experimental equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, B. H.; Kim, J. M.; Kim, T. J.; Nam, H. Y.; Jeong, J. Y.; Choi, B. H.; Choi, J. H

    2007-11-15

    An objective of washing technology development for sodium contaminated equipment is to clean and reuse safely and effectively the used equipment through a washing and maintenance, and recovery of the sodium wastes generated during washing.

  20. The application of GIS equipment in nuclear power plant

    International Nuclear Information System (INIS)

    Ji Lin; Huang Pengbo; Chang Xin'ai

    2012-01-01

    In this paper, the advantage and disadvantage of gas insulated switchgear (GIS) in environmental adaptability, operation safety and economic benefit are analyzed. Issues concerning the manufacture, transportation, on-site installation, operation, maintenance and extension of GIS equipment are discussed. Comparing those characteristics with air insulated switchgear (AIS), GIS is characterized by better aseismic ability, less occupied area and installation process, lower fault rate, longer maintenance period, easier for extension and higher economic benefit, SF6 gas insures the operation safety and reliability of GIS equipment, modular transport and re-assembling improves the installation flexibility. Therefore, GIS equipment may be the first choice for the primary equipment of nuclear power plant. (authors)

  1. Incidents of chemical reactions in cell equipment

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

    1991-12-31

    Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

  2. Report on the Audit of the Acquisition of the Tactical Air Operations Center/Modular Control Equipment

    Science.gov (United States)

    1991-06-06

    This is our final report on the Audit of the Acquisition of the Tactical Air Operations Center/Modular Control Equipment (TAOC/MCE) for your...matters of concern that could affect the acquisition of the TAOC/MCE. We performed the audit from March through December 1990. The audit objective was...controls related to the audit objectives. The audit was made in accordance with the Inspector General’s critical program management element approach

  3. Universal machine ''Shtrek'' and the tractor-lifter with pneumatic-equipment control. [Auxiliary multipurpose materials handling equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bal' bert, B M; Borumenskiy, V A; Lishenko, A P; Mitchenko, G A

    1982-01-01

    The machine ''Shtrek'' is described. It makes it possible to mechanize over 20 auxiliary operations: loading-unloading operations: extraction of old and deformed timbering; dissmantling of obstructions; erection of different types of timbering; making and restoring of drainage channels; laying and straightening of a drift and its leveling; assembly and disassembly of pipelines and mine equipment, etc. Depending on the type of operation, the machine has the corresponding suspended equipment. The elementary variant has a limited area of application at mines of the central region of the Dunbass. Currently a pneumatic variant of the machine ''Shtrek'' has been developed. The electric motor and the starter of the pumping equipment of the machine have been replaced by a pneumatic motor and pneumatically controlled valve KTM-50. In this case there was significant reduction in the weight of the pumping equipment and in its overall dimensions; the electric drive of the hydraulic distributors for controlling the mechanisms were replaced by simpler pneumatic ones; the logical circuit of the control system was constructed on the USEPPA elements. A specialized tractor-lifter designed for moving suspended loads is described for auxiliary operations in the near-face zone of the preparatory drifts. The machine also lifts and lowers the boom, rotates the boom by 270/sup 0/ and additionally lifts and lowers the weight-lifting hook.

  4. 40 CFR 63.1434 - Equipment leak provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Equipment leak provisions. 63.1434... Standards for Hazardous Air Pollutant Emissions for Polyether Polyols Production § 63.1434 Equipment leak provisions. (a) The owner or operator of each affected source shall comply with the HON equipment leak...

  5. Improved control rod drive handling equipment for BWRs [boiling-water reactors]: Final report

    International Nuclear Information System (INIS)

    Turner, A.P.L.; Gorman, J.A.

    1987-08-01

    Improved equipment for removing and replacing control rod drives (CRDs) in BWR plants has been designed, built and tested. Control rod drives must be removed from the reactor periodically for servicing. Removal and replacement of CRDs using equipment originally supplied with the plant has long been recognized as one of the more difficult and highest radiation exposure maintenance operations that must be performed at BWR plants. The improved equipment was used for the first time at Quad Cities, Unit 2, during a Fall 1986 outage. The trial of the equipment was highly successful, and it was shown that the new equipment significantly improves CRD handling operations. The new equipment significantly simplifies the sequence of operations required to lower a CRD from its housing, upend it to a horizontal orientation, and transport it out of the reactor containment. All operations of the new equipment are performed from the undervessel equipment handling platform, thus, eliminating the requirement for a person to work on the lower level of the undervessel gallery which is often highly contaminated. Typically, one less person is required to operate the equipment than were used with the older equipment. The new equipment incorporates a number of redundant and fail safe features that improve operations and reduce the chances for accidents

  6. 40 CFR 63.769 - Equipment leak standards.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Equipment leak standards. 63.769... § 63.769 Equipment leak standards. (a) This section applies to equipment subject to this subpart and... release to detect leaks, except under the following conditions. (i) The owner or operator has obtained...

  7. 40 CFR 63.424 - Standards: Equipment leaks.

    Science.gov (United States)

    2010-07-01

    ....424 Standards: Equipment leaks. (a) Each owner or operator of a bulk gasoline terminal or pipeline... location of all equipment in gasoline service at the facility. (c) Each detection of a liquid or vapor leak... replacement of leaking equipment shall be completed within 15 calendar days after detection of each leak...

  8. Equipment reliability improvement process; implementation in Almaraz NPP and Trillo NPP

    International Nuclear Information System (INIS)

    Risquez Bailon, Aranzazu; Gutierrez Fernandez, Eduardo

    2010-01-01

    The Equipment Reliability Improvement Process (INPO AP-913) is a non-regulatory process developed by the US Nuclear Industry for improving Plants Availability. This Process integrates and coordinates a broad range of equipment reliability activities into one process, performed by the Plant in a non-centralized way. The integration and coordination of these activities will allow plant personnel to evaluate the trends of important station equipment, develop and implement long-term equipment health plans, monitor equipment performance and condition, and make adjustments to preventive maintenance tasks and frequencies based on equipment operating experience, if necessary, arbitrating operational and design improvements, to reach a Failure-free Operation. This paper describes the methodology of Equipment Reliability Improvement Process, being focused on main aspects of the implementation process, relating to the scope and establishment of an Equipment Reliability Monitoring Plan, which should include and complement the existing mechanisms and organizations in the Plant to monitor the condition and performance of the equipments, with the common aim of achieving an operation free of failures. The paper will describe the tools that Iberdrola Ingenieria has developed to support the implementation and monitoring of the Equipment Reliability Improvement Process, as well as the results and lessons learned from its implementation in Almaraz NPP and Trillo NPP. (authors)

  9. On-site equipment and materials against CBRNE terrorism

    International Nuclear Information System (INIS)

    Yamamoto, Soichiro; Tokita, Kenichi

    2016-01-01

    There is no almighty field service equipment that can handle by itself all CBRNE (Chemical, Biological, Radiological, Nuclear, Explosive) terrorism. Since there is merit and demerit for each of equipment, operation methods and linkage of material/equipment based on detection principle are indispensable. This paper explained the principle and operation method of detection equipment, operation using multiple material/equipment, and system construction to facilitate cooperation with related ministries and agencies. There are six examples as typical material/equipment and detection principle for handling CBRNE as shown below: (1) ion mobility spectrometer, (2) infrared spectroscopy, (3) Raman scattering spectroscopy, (4) gas chromatographic mass spectrometry, (5) fluorescent reactive dye classification method, and (6) antigen antibody reaction method. This paper shows a flowchart that can measure within the duration of a respirator while wearing Level A protective clothing (about 15 to 20 min) by the combination of detector/analyzer based on these methods. The authors developed an information system that allows prompt information exchange between the on-site administrative agencies, research institutes, and other related organizations via network, in the case when substances etc. could not be specified in the above flowchart. (A.O.)

  10. Operation guide device for nuclear power plants

    International Nuclear Information System (INIS)

    Araki, Tsuneyasu

    1982-01-01

    Purpose: To enable to maintain the soundness of nuclear fuels and each of equipments by compensating the effect of the xenon density on the reactor core thermal power resulted upon load following operation of a nuclear reactor. Constitution: The device comprises an instrumentation system for measuring the status of the nuclear reactor, a reactor core performance calculator for calculating the reactor core performance based on the output from the instrumentation system, a xenon density calculator for calculating the xenon density based on the output from the performance calculator, a memory unit for storing the output from the reactor core performance calculator and the xenon density calculator and for transferring the stored memory to a nuclear reactor status forecasting device and an alternative load pattern searching device for searching, in cooperation with the memory unit, an alternative load pattern which is within an operation restrictive condition and most closed to a demanded load pattern when a monitor for the deviation from the flowrate distribution detects the deviation from the operation restrictive conditions. (Yoshino, Y.)

  11. 29 CFR 1926.603 - Pile driving equipment.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Pile driving equipment. 1926.603 Section 1926.603 Labor... Operations § 1926.603 Pile driving equipment. (a) General requirements. (1) Boilers and piping systems which are a part of, or used with, pile driving equipment shall meet the applicable requirements of the...

  12. Waste incineration models for operation optimization. Phase 1: Advanced measurement equipment for improved operation of waste fired plants; Affaldsforbraendingsmodeller til driftsoptimering. Fase 1: Avanceret maeleudstyr til forbedret drift af affaldsfyrede anlaeg

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-06-01

    This report describes results from the PSO projects ELTRA-5294 and ELTRA-5348: Waste incineration models for operation optimization. Phase 1, and Advanced measurement equipment for improved operation of waste fired plants. Phase 1. The two projects form the first step in a project course build on a long-term vision of a fully automatic system using a wide range of advanced measurement data, advanced dynamic models for prediction of operation and advanced regulation methods for optimization of the operation of waste incinerator plants. (BA)

  13. 30 CFR 250.1626 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.1626 Section... GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1626 Tubing and wellhead equipment. (a) No tubing string shall be placed into service or continue to be used unless such...

  14. The three-particle scattering operator in the correlation pattern representation

    International Nuclear Information System (INIS)

    De La Rubia, J.; Brey, J.J.; Moreno, F.

    1976-01-01

    It is shown that the ''correlation pattern representation'' permits the direct establishing of equivalence between the three-particle kinetic evolution operator obtained by means of Prigogine's method and the corresponding expression derived by Green and Cohen. Both expressions take into account the finite duration of collisions in a strictly equivalent way

  15. Riser equipment decontamination engineering task plan; TOPICAL

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  16. Daya Bay Nuclear Power Station equipment reliability management system innovation

    International Nuclear Information System (INIS)

    Gao Ligang; Wang Zongjun

    2006-01-01

    Daya Bay Nuclear Power Station has achieved good performance since its commercial operation in 1994. The equipment reliability management system that features Daya Bay characteristics has been established through constant technology introduction, digestion and innovation. It is also based on the success of operational system, equipment maintenance system and technical support system. The system lays a solid foundation for the long-term safe operation of power station. This article emphasizes on the innovation part of equipment reliability management system in Daya Bay. (authors)

  17. Organization of a joint operation of PC and CAMAC equipment using KK106 crate controller and MULTI interface

    International Nuclear Information System (INIS)

    Vagov, V.A.; Sirotin, A.P.; Tulaev, A.B.; Tumanov, A.V.

    1989-01-01

    Hardware and software which permit to provide a joint operation of IBM PC/XT/AT (or compatibles) with CAMAC equipment are described. Wide-spread in the JINR the 106 type interface is used as CAMAC Dataway controller and MULTI interface is used as PC-Bus adapter. MULTI additional on-board module Baby-106 that emulates cut-down UNIBUS for 106 type interface is designed. The means offered allow PC and CAMAC modules to operate jointly both via the program transfer channel and DMA channel. Maximum (hardware) performance is obtained in DMA case. 5 refs.; 1 fig

  18. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  19. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  20. Research on the Emergence Modeling of Equipment System

    Directory of Open Access Journals (Sweden)

    He Xin-Hua

    2017-01-01

    Full Text Available Under the conditions of information, the network-centric system and the confrontation in the system has developed into a major combat style. But the traditional line of sexual assessment method is difficult to accurately assess the information equipment system combat capability. Therefore, this paper studies the effective evaluation method of the operational capability of the information equipment system from the perspective of emerge. Based on the simulation modeling and evaluation method, building the capability model of the weapon equipment system to evaluate the operational capability of the information weapon weaponry equipment. Through the example analysis, the validity of the simulation model and the practicability of the evaluation system is analyzed by analyzing the examples.

  1. The establish and application of equipment reliability database in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zheng Wei; Li He

    2006-03-01

    Take the case of Daya Bay Nuclear Power Plant, the collecting and handling of equipment reliability data, the calculation method of reliability parameters and the establish and application of reliability databases, etc. are discussed. The data source involved the design information of the equipment, the operation information, the maintenance information and periodically test record, etc. Equipment reliability database built on a base of the operation experience. It provided the valid tool for thoroughly and objectively recording the operation history and the present condition of various equipment of the plant; supervising the appearance of the equipment, especially the safety-related equipment, provided the very practical worth information for enhancing the safety and availability management of the equipment and insuring the safety and economic operation of the plant; and provided the essential data for the research and applications in safety management, reliability analysis, probabilistic safety assessment, reliability centered maintenance and economic management in nuclear power plant. (authors)

  2. Safety requirements and feedback of commonly used material handling equipment

    International Nuclear Information System (INIS)

    Pathak, M.K.

    2009-01-01

    Different types of cranes, hoists, chain pulley blocks are the most commonly used material handling equipment in industry along with attachments like chains, wire rope slings, d-shackles, etc. These equipment are used at work for transferring loads from one place to another and attachments are used for anchoring, fixing or supporting the load. Selection of the correct equipment, identification of the equipment planning of material handling operation, examination/testing of the equipment, education and training of the persons engaged in operation of the material handling equipment can reduce the risks to safety of people in workplace. Different safety systems like boom angle indicator, overload tripping device, limit switches, etc. should be available in the cranes for their safe use. Safety requirement for safe operation of material handling equipment with emphasis on different cranes and attachments particularly wire rope slings and chain slings have been brought out in this paper. An attempt has also been made to bring out common nature of deficiencies observed during regulatory inspection carried out by AERB. (author)

  3. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  4. 14 CFR 91.213 - Inoperative instruments and equipment.

    Science.gov (United States)

    2010-01-01

    ... specific operations by this part. (c) A person authorized to use an approved Minimum Equipment List issued... a master minimum equipment list has not been developed; or (ii) Small rotorcraft, nonturbine-powered small airplane, glider, or lighter-than-air aircraft for which a Master Minimum Equipment List has been...

  5. Recommendations to ASME for code guidelines and criteria for continued operation of equipment

    International Nuclear Information System (INIS)

    Harvey, J.F.

    1993-01-01

    In May 1988, the American Society of Mechanical Engineers, ASME, asked the Pressure Vessel Research Council, PVRC, to review the part it should play in the continued operation of equipment originally designed and fabricated to the ASME codes and rules. This was prompted solely by an economic opportunity in which the capital expenditures to replace plants was far more costly than evaluating, repairing, and extending the nominal design life of the individual component. For instance, nuclear plants are normally designed for a life of 40 years, while fossil fired facilities may have been designed for other time lives, yet at the end of their original design life may actually have many useful years remaining. While this action was economically prompted, it inherently involved a two-fold one; namely, (1) safety, (2) legal. There is no question of safety to operating personnel. While codes for fossil components do not specify design lives, their adoption by many states provides a legal means of procedure in event of a mishap. This recognizes a cradle-to-grave safety responsibility. It is toward maintaining ASMEs leadership as a code authority that this report has been prepared

  6. The replace repair decision for heavy equipment.

    Science.gov (United States)

    2004-01-01

    The fleet of equipment operated by the Virginia Department of Transportation (VDOT) constitutes a large investment, on the order of half a billion dollars. A means of identifying earlier and more accurately those pieces of equipment whose timely repl...

  7. Results from Operational Testing of the Siemens Smart Grid-Capable Electric Vehicle Supply Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Brion [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    The Idaho National Laboratory conducted testing and analysis of the Siemens smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from Siemens for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the Siemens smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionality testing, abnormal conditions testing, and charging of a plug-in vehicle.

  8. COMPLEX CORONARY PATTERN AFFECTING THE SURGICAL OUTCOME OF ARTERIAL SWITCH OPERATION

    Directory of Open Access Journals (Sweden)

    Amit

    2015-12-01

    Full Text Available BACKGROUND Arterial switch operation (ASO has become the procedure of choice for the transposition of great arteries as well as for Taussig-Bing anomaly. Relocation of coronary arteries remains a technical problem in anatomic correction of the transposed great arteries. The present prospective study is designed to analyse the effect of coronary artery pattern on surgical outcome of arterial switch operation. METHOD From August 2014 to November 2015, total 60 patients underwent ASO. The patients are divided in three groups. Group-A 21 patients with d-TGA with intact ventricle septum (d-TGA intact IVS, in Group-B 33 patients d-TGA with ventricular septal defect (d-TGA, VSD, and in Group C 6 Taussig Bing anomaly. The coronary pattern and outcome is analyzed. RESULTS The overall mortality related to coronary pattern was 5%. The 2 patients died due to Intramural coronary artery leading to post-operative ventricular dysfunction, another patient with single retro pulmonary coronary artery died secondary to low coronary implant leading to kinking in coronary artery and myocardial dysfunction. On 12 monthly follow up, one of the Patients in group A had right pulmonary artery stenosis with gradient of 30 mm of Hg. Another patient in group B had supravalvular gradient of 20 mm of Hg. CONCLUSION The ASO for TGA and Taussig-Bing anomaly has low early and late mortality. However, the mortality is still seen in the patients with Intramural coronary artery and in the patient with single coronary artery with retro pulmonary course.

  9. FUNDAMENTALS OF RELIABILITY OF ELECTRIC POWER SYSTEM AND EQUIPMENT

    OpenAIRE

    Engr. Anumaka; Michael Chukwukadibia

    2011-01-01

    Today, the electric power system consists of complex interconnected network which are prone to different problems that militates against the reliability of the power system. Inadequate reliability in the power system causes problems such as high failure rate of power system installations and consumer equipment, transient and intransient faults, symmetrical faults etc. This paper provides an extensive review of the powers system and equipment reliability and related failure patterns in equipment.

  10. 7 CFR 58.131 - Equipment and facilities.

    Science.gov (United States)

    2010-01-01

    .... Receiving stations shall comply with the applicable sections of this subpart covering premises, buildings, facilities, equipment, utensils, personnel, cleanliness and health. (2) Transfer stations. Transfer stations... equipment, piping and utensils and personnel—cleanliness and health. As climatic and operating conditions...

  11. The point of view of thermal equipment users; Le point de vue des gestionnaires d`equipements thermiques

    Energy Technology Data Exchange (ETDEWEB)

    Barroyer, P. [Compagnie Generale de Chauffe, 59 - Saint Andre Lez Lille (France)

    1997-12-31

    The influence of new pollution regulations in France on the operation of thermal equipment for central heating systems or industrial heat process systems, is examined. The main French regulations concerning air pollution control and energy rational consumption are reviewed, and their effects on the design, equipment, operation and costs of heat plants are discussed: impacts of the decree on upgrading and disposal of fossil fuel ashes, the decree on special protection zone (large cities), the clean air law, the compulsory declaration for classified combustion plants and limit air pollution emission levels

  12. 30 CFR 77.1109 - Quantity and location of firefighting equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment such as portable drills, sweepers, and scrapers, when operated more than 600 feet from equipment... tank. (f) Vehicles transporting explosives and blasting agents shall be equipped with fire protection...

  13. 41 CFR 101-25.109-2 - Equipment pools.

    Science.gov (United States)

    2010-07-01

    ... number and location of equipment pools, consideration shall be given to economy of operation, mobility of... available for sharing or loan. Information concerning the availability of this equipment can be maintained...

  14. Design of special purpose equipment - remote control dozer

    International Nuclear Information System (INIS)

    Aprameyan, K.

    1990-01-01

    Operation environment in handling hot slag, radio active material, clearing/dismantling buildings and loose rocky zones pose hazards with the operation of heavy duty vehicles. Under such hazardous environment conditions, elimination of operator becomes the prime criteria. Remote control of heavy vehicles is resorted to operate the equipment in various working conditions. Radio control systems coupled with penumatic/hydraulic actuators and proportional control logics aim total control of the equipment from a distance using hand pendants. Bharat Earth Moovers Limited has successfully developed remote control system for dozers of 200hp and 300hp. (author). 3 figs

  15. Apparatuses and methods of determining if a person operating equipment is experiencing an elevated cognitive load

    Science.gov (United States)

    Watkins, Michael L.; Keller, Paul Edwin; Amaya, Ivan A.

    2015-06-16

    A method of, and apparatus for, determining if a person operating equipment is experiencing an elevated cognitive load, wherein the person's use of a device at a first time is monitored so as to set a baseline signature. Then, at a later time, the person's use of the device is monitored to determine the person's performance at the second time, as represented by a performance signature. This performance signature can then be compared against the baseline signature to predict whether the person is experiencing an elevated cognitive load.

  16. 47 CFR 18.111 - General operating conditions.

    Science.gov (United States)

    2010-10-01

    ... EQUIPMENT General Information § 18.111 General operating conditions. (a) Persons operating ISM equipment... equipment otherwise complies with the rules in this part, the operator of ISM equipment that causes harmful... interference to an authorized radio station or a radiocommunication device operating in an ISM frequency band...

  17. [Hydrotherapy equipment].

    Science.gov (United States)

    Tsibikov, V B; Ragozin, S I; Mikheeva, L V

    1985-01-01

    A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.

  18. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  19. Development of augmented reality system for servicing electromechanical equipment

    Science.gov (United States)

    Zhukovskiy, Y.; Koteleva, N.

    2018-05-01

    Electromechanical equipment is widely used. It is used in industrial enterprises, in the spheres of public services, in everyday life, etc. Maintenance servicing of electromechanical equipment is an important part of its life cycle. High-quality and timely service can extend the life of the electromechanical equipment. The creation of special systems that simplify the process of servicing electromechanical equipment is an urgent task. Such systems can shorten the time for maintenance of electrical equipment, and, therefore, reduce the cost of maintenance in general. This article presents an analysis of information on the operation of service services for maintenance and repair of electromechanical equipment, identifies the list of services, and estimates the time required to perform basic service operations. The structure of the augmented reality system is presented, the ways of interaction of the augmented reality system with the automated control systems working at the enterprise are presented.

  20. MOPABA-H2 - Computer code for calculation of hydrogen generation and distribution in the equipment of power plants with WWER type reactors in design modes of operation

    International Nuclear Information System (INIS)

    Arkhipov, O.P.; Kharitonov, Yu.V.; Shumskiy, A.M.; Kabakchi, S.A.

    2002-01-01

    With the aim of ensuring the hydrogen explosive-proof situation in the reactor plant, a complex of scientific-and-research work was carried out including the following: revealing the mechanisms of generation and release of hydrogen in the primary equipment components under design operation modes of the reactor plant with WWER; development of calculation procedure and computer code MOPABA-H2 enabling to determine the hydrogen content in RP equipment components under design operation modes. In the process of procedure development it was found out that the calculation of hydrogen content in the plant equipment requires development of the following main mathematical models: radiochemical processes in the primary coolant which has impurities and added special reagents; absorption of the core ionizing radiation by the coolant; steam-zirconium reaction (during design-basis accident of LOCA type); coolant mass transfer over the reactor plant equipment including transition of the phase boundary by the components of the coolant. (author)

  1. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  2. 14 CFR 121.337 - Protective breathing equipment.

    Science.gov (United States)

    2010-01-01

    ... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.337... systems other than chemical oxygen generators, there must be a means to allow the crew to readily... fully charged. (iv) For each chemical oxygen generator, the supply system equipment must meet the...

  3. Quantitative techniques for medical equipment maintenance management

    NARCIS (Netherlands)

    Ben Houria, Zeineb; Masmoudi, Malek; Al Hanbali, Ahmad; Khatrouch, Ikram; Masmoudi, Faouzi

    2016-01-01

    The maintenance department in a hospital is responsible for ensuring the safety of medical equipment and their availability while keeping the operation costs minimal. The selection of the best maintenance strategy is a key decision to reduce the equipment downtime, increase the availability, and

  4. 30 CFR 75.1400 - Hoisting equipment; general.

    Science.gov (United States)

    2010-07-01

    ... transport persons shall be equipped with brakes capable of stopping the fully loaded platform, cage, or... every two months. (d) Hoisting equipment, including automatic elevators, used to transport persons shall... required for automatically operated cages, platforms, or elevators. [48 FR 53239, Nov. 25, 1983] ...

  5. 46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Science.gov (United States)

    2010-10-01

    ... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...

  6. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  7. Application of ELD and load forecast in optimal operation of industrial boiler plants equipped with thermal stores

    International Nuclear Information System (INIS)

    Cao Jiacong

    2007-01-01

    Optimal operation of industrial boiler plants with objects of high energy efficiency and low fuel cost is still well worth investigating when energy problem becomes a world's concern, for there are a great number of boiler plants serving industries. The optimization of operation is a measure that is less expensive and easier to carry out than many other measures. Economic load dispatch (ELD) is an effective approach to optimal operation of industrial boiler plants. In the paper a newly developed method referred to as the method of minimum-departure model (MDM) is used in the ELD for boiler plants. It is more convenient for carrying out ELD when boiler plants are equipped with thermal energy stores that usually adopt the working mode of optimal segmentation of a daily load curve. In the case of industrial boiler plants, ELD needs a prerequisite, viz., the accurate load forecast, which is performed using artificial neural networks in this paper. A computer program for the optimal operation was completed and applied to an example, which results the minimum daily fuel cost of the whole boiler plant

  8. Computer imaging of EBR-II fuel handling equipment

    International Nuclear Information System (INIS)

    Peters, G.G.; Hansen, L.H.

    1995-01-01

    This paper describes a three-dimensional graphics application used to visualize the positions of remotely operated fuel handling equipment in the EBR-II reactor. A three-dimensional (3D) visualization technique is necessary to simulate direct visual observation of the transfers of fuel and experiments into and out of the reactor because the fuel handling equipment is submerged in liquid sodium and therefore is not visible to the operator. The system described in this paper uses actual signals to drive a three-dimensional computer-generated model in real-time in response to movements of equipment in the plant This paper will present details on how the 3D model of the intank equipment was created and how real-time dynamic behavior was added to each of the moving components

  9. Research on the Combination of Underwater Acoustic Countermeasure Equipments Against Torpedo

    Directory of Open Access Journals (Sweden)

    Meng Jie

    2016-01-01

    Full Text Available Today the use of acoustic countermeasure equipment has become the main means in submarine defense torpedo operation. Combination of acoustic countermeasure equipments are used during the operation so that we can amplify the countermeasure effect. Based on the subject of the acoustic countermeasure equipments’ combined use, this paper analyses the interference between these soft kill countermeasure equipments including gas curtain, acoustic decoy and acoustic interferometer, summarizes the advantages and disadvantages of the different combined use of acoustic countermeasure equipments.

  10. LESSONS LEARNED IN TESTING OF SAFEGUARDS EQUIPMENT

    International Nuclear Information System (INIS)

    Pepper, S.; Farnitano, M.; Carelli, J.; Hazeltine, J.; Bailey, D.

    2001-01-01

    The International Atomic Energy Agency's (IAEA) Department of Safeguards uses complex instrumentation for the application of safeguards at nuclear facilities around the world. Often, this equipment is developed through cooperation with member state support programs because the Agency's requirements are unique and are not met by commercially available equipment. Before approving an instrument or system for routine inspection use, the IAEA subjects it to a series of tests designed to evaluate its reliability. In 2000, the IAEA began to observe operational failures in digital surveillance systems. In response to the observed failures, the IAEA worked with the equipment designer and manufacturer to determine the cause of failure. An action plan was developed to correct the performance issues and further test the systems to make sure that additional operational issues would not surface later. This paper addresses the steps taken to address operation issues related to digital image surveillance systems and the lessons learned during this process

  11. Computer imaging of EBR-II handling equipment

    International Nuclear Information System (INIS)

    Hansen, L.H.; Peters, G.G.

    1994-10-01

    This paper describes a three-dimensional graphics application used to visualize the positions of remotely operated fuel handling equipment in the EBR-II reactor. The system described in this paper uses actual signals to move a three-dimensional graphics model in real-time in response to movements of equipment in the plant. A three-dimensional (3D) visualization technique is necessary to simulate direct visual observation of the transfers of fuel and experiments into and out of the reactor because the fuel handling equipment is submerged in liquid sodium and therefore is not visible to the operator. This paper will present details on how the 3D model was created and how real-time dynamic behavior was added to each of the moving components

  12. Standard guide for hot cell specialized support equipment and tools

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 Intent: 1.1.1 This guide presents practices and guidelines for the design and implementation of equipment and tools to assist assembly, disassembly, alignment, fastening, maintenance, or general handling of equipment in a hot cell. Operating in a remote hot cell environment significantly increases the difficulty and time required to perform a task compared to completing a similar task directly by hand. Successful specialized support equipment and tools minimize the required effort, reduce risks, and increase operating efficiencies. 1.2 Applicability: 1.2.1 This guide may apply to the design of specialized support equipment and tools anywhere it is remotely operated, maintained, and viewed through shielding windows or by other remote viewing systems. 1.2.2 Consideration should be given to the need for specialized support equipment and tools early in the design process. 1.2.3 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conv...

  13. Fundamentals of using bio-diesel for operating large fleets of mining equipment and building machines and the experience gained so far

    International Nuclear Information System (INIS)

    Drebenstedt, C.; Jauer, J.

    2008-01-01

    Against the topical background of the finite reserves of fossil mineral oil as well as internationally available vegetable fat and oil resources, of the current developments in the field of the biodiesel production technology and of the international conditions for the reduction of CO 2 emissions, this paper is to examine, whether the suitability of bio-diesel for fuelling mining equipment has come true. The examination will focus on the biogenic fuel profile, on the organizational necessity to actively retrofit the machinery during operations as well as on the precise verification of the expected technical conversion problems and of the saving potentials actually achieved. The examination will be conducted in the world's first open-cast mine that has converted its entire fleet of equipment to be fuelled with bio-diesel. The open-cast mine is operated by the Ronneburg branch of Wismut GmbH, a company based in Germany (referred to hereinafter as the Lichtenberg open-cast mine). (orig.)

  14. Procedure to evaluate and control efficiently the operations management of medical equipment in the maintenance unit of a health institution

    Directory of Open Access Journals (Sweden)

    Herrera-Galán Michael

    2018-01-01

    Full Text Available Maintenance management plays a very important role in the success of any company. As a consequence of this, in the year of 2013, a study was carried out in health facilities found in the South Eastern Region of Jamaica with the objective of evaluating the existing Maintenance Management Program for Medical Equipment. Among the results obtained, it showed that there is an inadequacy in the existing program whose principal deficiency is attributed to the operations management. As such, this work proposes a procedure for evaluating and controlling in an efficient manner the operations management within the Biomedical Department which forms part of the South East Regional Health Authority Maintenance Unit (SERHAMU, this latter is found on the premises of the Bustamante Hospital for Children (BHC, Jamaica. The method used to develop the procedure (GOMHO is based fundamentally on the design of: a codification system to identify control registers and to record failures associated with each equipment, a system of placing equipment into categories and further differentiating them based on the potential hazard such pose on the human body in the event of an operational failure. In addition, this procedure gives the SERHAMU at the BHC the opportunity to calculate the amount of human resources needed to carry out efficiently the preventative and corrective maintenance work being demanded on the department. During the implementation phase, the results demonstrated that from the control procedure designed there was an improvement in the planning and carrying out of maintenance work and a better system of monitoring the activities that are executed. Also, it was evidenced that there is a 61.53% of the amount of human resources needed to carry out the maintenance actions.

  15. 14 CFR 121.357 - Airborne weather radar equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... § 121.357 Airborne weather radar equipment requirements. (a) No person may operate any transport... December 31, 1964, unless approved airborne weather radar equipment has been installed in the airplane. (b...

  16. Plant operation monitoring method and device therefor

    International Nuclear Information System (INIS)

    Ando, Tsugio; Matsuki, Tsutomu.

    1997-01-01

    The present invention provides a method of and a device for monitoring the operation of a nuclear power plant during operation, which improves the safety and reliability of operation without increasing an operator's burden. Namely, a chief in charge orally instruct an operation to an operator upon the operation of a plant constituent equipment. The operator points the equipment and calls the name. Actual operation instruction for the equipment is inputted after confirmation by oral response. The voices of theses series of operation instruction/point-calling/response confirmation are taken into a voice recognition processing device. The processing device discriminates each of the person who calls, and discriminates the content of the calls and objective equipments to be operated. Then, the series of procedures and contents of the operation for the equipments previously disposed in the data base are compared with the order of inputted calls, discriminated contents and the objective equipments to be operated. If they are not agreed with each other, the operation instruction is blocked even if actual operation instructions are inputted. (I.S.)

  17. Equipment experience in a radioactive LFCM [liquid-fed ceramic melter] vitrification facility

    International Nuclear Information System (INIS)

    Holton, L.K. Jr.; Dierks, R.D.; Sevigny, G.J.; Goles, R.W.; Surma, J.E.; Thomas, N.M.

    1986-11-01

    Since October 1984, the Pacific Northwest Laboratory (PNL) has operated a pilot-scale radioactive liquid-fed ceramic melter (RLFCM) vitrification process in shielded manipulator hot cells. This vitrification facility is being operated for the Department of Energy (DOE) to remotely test vitrification equipment components in a radioactive environment and to develop design and operation data that can be applied to production-scale projects. This paper summarizes equipment and process experience obtained from the operations of equipment systems for waste feeding, waste vitrification, canister filling, canister handling, and vitrification off-gas treatment

  18. Defense waste processing facility radioactive operations. Part 1 - operating experience

    International Nuclear Information System (INIS)

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation's first and the world's largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge trademark level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs

  19. Equipment and appliances for underwater operations. Pt. 2

    International Nuclear Information System (INIS)

    Krueger, P.

    1976-01-01

    The 6/75 edition of 'mt' reported on the 'ARGE underwater appliances' and the study on 'design development of appliances and equipment for underwater use' in a brief summary. One of these designs, the 'unmanned DSWS underwater appliance' was described in detail. The present article describes three further design developments mentioned in the above study and which are based on unmanned appliances connected to the mother-ship. These designs were developed by Preussag-Meerestechnik. (orig.) [de

  20. Transuranic package transporter (TRUPACT) system design status and operational support equipment

    International Nuclear Information System (INIS)

    Johanson, N.W.; Meyer, R.J.; Romesberg, L.E.; Pope, R.B.

    1983-01-01

    A program was initiated in the late 1970's at Sandia National Laboratories to develop an efficient, safe, reliable, and cost-effective transportation packaging system for the carriage of contact-handled transuranic (CH-TRU) waste within the Department of Energy (DOE) complex. It is anticipated that eventually a family of TRUPACT (TRansUranic PACKage Transporter) systems having varied dimensions and weight/volume capacities will be needed by the DOE to transport different CH-TRU waste forms. Each TRUPACT system will be a Type B packaging. Large quantities of CH-TRU wastes having many different forms, isotopic contents, and contained in a variety of waste containers have been, are being, and will continue to be produced and stored for ultimate disposal. Packaging design is being closely coordinated with facility designs to ensure the rapid and economic integration of the TRUPACT system. The first packaging developed for transport by truck or rail (bimodal) is designated TRUPACT-I and will become operational in 1984. This paper provides an overview of progress on the TRUPACT-I design and details of equipment to be used for interfacing with users

  1. Large-component handling equipment and its use

    International Nuclear Information System (INIS)

    Krieg, S.A.; Swannack, D.L.

    1983-01-01

    The Fast Flux Test Facility (FFTF) reactor systems have special requirements for component replacements during maintenance servicing. Replacement operations must address handling of equipment within shielded metal containers while maintaining an inert atmosphere to prevent reaction of sodium with air. Plant identification of a failed component results in selecting and assembling the maintenance cask and equipment transport system for transfer from the storage facility to the Reactor Containment Building (RCB). This includes a proper diameter and length cask, inert atmosphere control consoles, component lift fixture and support structure for interface with the facility area surrounding the component. This equipment is staged in modular groups in the Reactor Service Building for transfer through the equipment airlock to the containment interior. The failed component is generally prepared for replacement by installation of the special lifting fixture attachment. Assembly of the cask support structure is performed over the component position on the containment building operating floor. The cask and shroud from the reactor interface are inerted after all manual service connections and handling attachments are completed. The component is lifted from the reactor and into the cask interior through a floor valve which is then closed to isolate the component reactor port. The cask with sodium wetted component is transferred to a service/repair location, either within containment or outside, to the Maintenance Facility cleaning and repair area. The complete equipment and handling operations for replacement of a large reactor component are described

  2. 33 CFR 154.545 - Discharge containment equipment.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Equipment Requirements § 154... chapter may be utilized in the planning requirements of subpart F and subpart H of this part. [CGD 75-124... material and equipment to contain any oil or hazardous material discharged on the water from operations at...

  3. 40 CFR 63.1410 - Equipment leak provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Equipment leak provisions. 63.1410... leak provisions. The owner or operator of each affected source shall comply with the requirements of 40 CFR part 63, subpart UU (national emission standards for equipment leaks (control level 2)) for all...

  4. Radiological equipment analyzed by specific developed phantoms and software

    International Nuclear Information System (INIS)

    Soto, M.; Campayo, J. M.; Mayo, P.; Verdu, G.; Rodenas, F.

    2010-10-01

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be computerized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In case of film-screen equipment s this analysis could be applied digitalising the image in a professional scanner. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment s. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment s and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques... etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (m As). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (Author)

  5. Radiological equipment analyzed by specific developed phantoms and software

    Energy Technology Data Exchange (ETDEWEB)

    Soto, M.; Campayo, J. M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, Local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Mayo, P. [TITANIA Servicios Tecnologicos SL, Sorolla Center, Local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Verdu, G.; Rodenas, F., E-mail: m.soto@lainsa.co [ISIRYIM Universidad Politecnica de Valencia, Camino de Vera s/n, Valencia (Spain)

    2010-10-15

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be computerized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In case of film-screen equipment s this analysis could be applied digitalising the image in a professional scanner. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment s. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment s and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques... etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (m As). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (Author)

  6. Electromagnetic compatibility for the control and command equipments in nuclear power plants

    International Nuclear Information System (INIS)

    Buisson, J.

    1985-06-01

    Different kinds of electrical interference produce some disturbance on electronic sub-assemblies used to assume the control and the command of nuclear reactors. Following interferences are described: power supply lines perturbations, potential difference between grounding connections, electromagnetic fields. A method is described for testing the EMC of different equipments. The advantages of this method are: no destructive method, usable for testing equipment ''in situ'' in operating conditions on nuclear power plant, usable for testing equipment before operating conditions (acceptance test), level of the testing signals similar to the electrical interference level induced by the electromagnetic environment in normal operating conditions, no particular equipment and installation for test are required [fr

  7. Results from the Operational Testing of the Eaton Smart Grid Capable Electric Vehicle Supply Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Brion [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    The Idaho National Laboratory conducted testing and analysis of the Eaton smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from Eaton for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the Eaton smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionality testing, abnormal conditions testing, and charging of a plug-in vehicle.

  8. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  9. 49 CFR 236.1006 - Equipping locomotives operating in PTC territory.

    Science.gov (United States)

    2010-10-01

    ... 31, 2015, a train controlled by a locomotive with an onboard PTC apparatus that has failed en route... III railroad, including a tourist or excursion railroad, and controlled by a locomotive not equipped...

  10. THE OPERATION OF POWER EQUIPMENT DURING THE DISPOSAL OF COMBUSTIBLE GASES ASSOCIATED WITH GEOTHERMAL WATER

    Directory of Open Access Journals (Sweden)

    G. Ya. Akhmedov

    2017-01-01

    Full Text Available Objectives. The aim of the study is to assess the appropriateness of utilising combustible gases associated with geothermal water with  low gas factor and the possibility of its practical implementation with  the provision of power equipment operation of geothermal systems  with a nonscaling mode.Methods. The investigations were carried out by analysing the content of associated combustible gases in the underground  thermomineral waters of the Cis-Caucasian deposits on the basis of  an assessment of the feasibility of their utilisation for heating and  hot water supply.Results. A review of practically existing heat and power schemes  utilising geothermal water sources is carried out. Based on the  studies conducted, it is found that methane (70-90% is prevalent in the water under consideration; meanwhile, the content of heavy hydrocarbons does not exceed 10%. The concentration of carbon  dioxide is 3 ÷ 6%, nitrogen 1 ÷ 4%. Depending on the depth of the  aquifer, gas factors range from 1 to 5 m3/ m3. As a result of the  analysis of the operation of typical thermal distribution stations, it is  established that a violation of the carbon dioxide equilibrium in water leads to the formation of a solid phase of calcium carbonate on the  heat exchange surface. A technique for estimating the relationship between the partial pressure of methane and carbon dioxide with the total pressure in a solution of geothermal water is proposed. A  scheme for the efficient operation of thermal distribution stations  with the prevention of carbonate deposits formation by using the  combustion products of the used gas combined with the injection of waste water back into the aquifer is presented.Conclusion. As a result of the conducted studies, the possibility of  using associated combustible gases in geothermal wells is  established using differences in their solubility and that of carbon  dioxide. In this case, the protection of

  11. File structure and organization in the automation system for operative account of equipment and materials in JINR

    International Nuclear Information System (INIS)

    Gulyaeva, N.D.; Markova, N.F.; Nikitina, V.I.; Tentyukova, G.N.

    1975-01-01

    The structure and organization of files in the information bank for the first variant of a JINR material and technical supply subsystem are described. Automated system of equipment operative stock-taking on the base of the SDS-6200 computer is developed. Information is stored on magnetic discs. The arrangement of each file depends on its purpose and structure of data. Access to the files can be arbitrary or consecutive. The files are divided into groups: primary document files, long-term reference, information on items that may change as a result of administrative decision [ru

  12. REQUIREMENTS FOR DESIGN, EQUIPMENT AND OPERATION MODE OF TAXI VEHICLES

    Directory of Open Access Journals (Sweden)

    Norayr Oganesovich Bludyan

    2015-09-01

    Full Text Available The analysis of international experience in application of requirements for the taxi vehicles design and equipment. The approaches to improvement of cabbing have been defined by determination of requirements for taxi vehicles.

  13. An overview of equipment survivability studies at Sandia National Laboratories (SNL)

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Craft, Ch.M.; McCulloch, W.H.; Sebrell, W.A.

    1983-01-01

    The USNRC sponsors a number of programs at Sandia National Laboratories (SNL) specifically addressing safety-related equipment survivability. The major thrust of these programs has been the physical testing of equipment. Test results illustrate the importance of a dedicated equipment design effort giving particular attention to the safety implications of the equipment operation. Several equipment survivability tests here have revealed equipment design and test-related deficiencies

  14. Low activation diagnostic equipment design studies

    International Nuclear Information System (INIS)

    Hopkins, G.R.; Cheng, E.T.; Fisher, R.K.

    1985-01-01

    The low activation fusion concept has been applied to the diagnostic equipment in a fusion reactor. The components where fabrication from low activation materials is feasible have been identified. Other systems where higher activation elements are required can have their activation reduced by design approaches which include shielding and operation only in low flux regions of the reactor. Some components will not operate in a high flux so activation is not a major concern. This low activation diagnostic equipment study completes a series of low activation studies where all the components in a fusion power reactor have now been evaluated. It is concluded that a completely low activation fusion reactor is feasible with all components meeting the functional requirements. This provides an environmentally benign energy source with a high confidence level in meeting safety criteria in operation, maintenance and waste disposal

  15. 33 CFR 157.170 - COW equipment: Removal.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false COW equipment: Removal. 157.170... Crude Oil Washing (COW) System on Tank Vessels Cow Operations § 157.170 COW equipment: Removal. (a) Whenever a deck mounted COW machine is removed from the tank, the master shall ensure that: (1) The supply...

  16. Audio-Visual Equipment Depreciation. RDU-75-07.

    Science.gov (United States)

    Drake, Miriam A.; Baker, Martha

    A study was conducted at Purdue University to gather operational and budgetary planning data for the Libraries and Audiovisual Center. The objectives were: (1) to complete a current inventory of equipment including year of purchase, costs, and salvage value; (2) to determine useful life data for general classes of equipment; and (3) to determine…

  17. Operator dermal exposure and protection provided by personal protective equipment and working coveralls during mixing/loading, application and sprayer cleaning in vineyards.

    Science.gov (United States)

    Thouvenin, Isabelle; Bouneb, Françoise; Mercier, Thierry

    2017-06-01

    The efficiency of a working coverall combined with personal protective equipment to protect operators against dermal exposure to plant protection products under field conditions was studied. Operators wore a non-certified water-repellent finish polyester/cotton coverall plus a certified gown during the mixing/loading and the cleaning phases. Insecticide foliar application to a vineyard was selected as the exposure scenario. The overall dermal residue levels measured in this study were in the range of data recently collected in Europe. The water-repellent finish working coverall reduced body exposure by a factor of approximately 95%. Wearing a Category III Type 3 partial body gown during mixing/loading and cleaning of the application equipment led to a further protective effect of 98.7%. The combination of a water-repellent finish working coverall and partial body protection during specific tasks provided satisfactory levels of protection and can be considered as suitable protection for the conditions of use studied.

  18. Practical approaches to implementing facility wide equipment strengthening programs

    International Nuclear Information System (INIS)

    Kincaid, R.H.; Smietana, E.A.

    1989-01-01

    Equipment strengthening programs typically focus on components required to ensure operability of safety related equipment or to prevent the release of toxic substances. Survival of non-safety related equipment may also be crucial to ensure rapid recovery and minimize business interruption losses. Implementing a strengthening program for non-safety related equipment can be difficult due to the large amounts of equipment involved and limited budget availability. EQE has successfully implemented comprehensive equipment strengthening programs for a number of California corporations. Many of the lessons learned from these projects are applicable to DOE facilities. These include techniques for prioritizing equipment and three general methodologies for anchoring equipment. Pros and cons of each anchorage approach are presented along with typical equipment strengthening costs

  19. Data base EQDB - data base of the qualified equipment's for NPP

    International Nuclear Information System (INIS)

    Rovny, K.

    2009-01-01

    In the contribution, there is presented the project of the data base for qualified equipment's for nuclear power plants. The data base is operated by the 'Certification body which certified the products - the chosen equipment's for nuclear power plants', reg. No. P-028, at VUJE, Inc. Trnava. Data base will serve to the designers, the operators of the nuclear power plants and the workers from Nuclear regulatory authority of the Slovak Republic as a source of information about the state of concrete type equipment's qualification. In the first part of the contribution, there is information about the legislation and technical requirements for equipment's qualification, the way of demonstration and importance of the qualification for the operator. In the next part, there is presented the own structure of data base and the works with own data base regarding the examples of concrete equipment's. The data base will be accessible after the free registration on address WWW.EQDB.sk from 1.5.2009

  20. Application of Equipment Monitoring Technology in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kang, H. T.; Lee, J. K.; Lee, K. D.; Jo, S. H.

    2012-01-01

    The major goal of nuclear power industries during the past 10 years is to increase reliability and utility capacity factor. As the capacitor factor, however, crept upward. it became harder to attain next percentage of improvement. Therefore other innovative technologies are required. By the technologies applied to the fossil power plants, equipment health monitoring was performed on equipment to maintain it in operable condition and contributed on improving their reliability a lot. But the equipment monitoring may be limited to the observation of current system states in nuclear power plant. Monitoring of current system states is being augmented with prediction of future operating states and predictive diagnosis of future failure states. Such predictive diagnosis is motivated by the need for nuclear power plants to optimize equipment performance and reduce costs and unscheduled downtime. This paper reviews the application of techniques that focus on improving reliability in nuclear power plant by monitoring and predicting equipment health and suggests how possible to support on-line monitoring

  1. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  2. APPLICATION OF EQUIPMENT FOR AUTOMATIC CONTROL OF PLANAR STRUCTURES IN MANUFACTURING MASTER MASKS OF INTEGRATED CIRCUITS ON PHOTO-MASKS

    Directory of Open Access Journals (Sweden)

    S. M. Avakov

    2007-01-01

    Full Text Available Following the concept of defect-free manufacturing of master masks of IC on photo-masks, two Belarusian sets of optomechanical equipment for 0,3 5 p and 90 nanometers are presented in the paper. Each of the sets comprises:   • Multi-channel laser pattern generator; • Automatic mask defect inspection system; • Laser-based mask defect repair system.The paper contains description of automatic mask defect inspection process during photo-mask manufacturing and respective basic technological operations of the processes.Advantages of a complex approach to the development of a set of opto-mechanical equipment for defect-free manufacturing of photo-masks have been analyzed in the paper. 

  3. Method for keeping equipment and pipeline of nuclear power plant

    International Nuclear Information System (INIS)

    Okubo, Osamu.

    1990-01-01

    The present invention intends to suppress corrosion of equipments and pipelines in condensate, feedwater and feedwater heater drain systems during operation of a nuclear power plant. That is, condensate, feedwater and drain remained in equipments and pipelines just after the stopping of operation are passed through pipelines comprising only conduits, or they are introduced to a condensator passing through the pipelines and condensate pipes. Further, the remaining droplets on the inner surfaces are evaporated by the remaining heat of the equipments and the pipelines themselves. Then, the equipments and pipelines are isolated from other regions and kept. In view of the above, since condensate, feedwater and water feeder drains are introduced directly to the condensator passing through the conduits in which other equipments such as tanks and pumps are not present and are isolated and kept, corrosion of the equipments and the pipelines is suppressed and radioactive contamination is suppressed from prevailing by way of cruds. (I.S.)

  4. Environmental qualification program of electric equipment for Angra 1

    Energy Technology Data Exchange (ETDEWEB)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C., E-mail: grazi@eletronuclear.gov.br, E-mail: justino@eletronuclear.gov.br, E-mail: candeia@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2017-11-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  5. Environmental qualification program of electric equipment for Angra 1

    International Nuclear Information System (INIS)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C.

    2017-01-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  6. New version of VDE 0118 Installation of electrical equipment in underground mining

    Energy Technology Data Exchange (ETDEWEB)

    Gebhardt, L

    1981-10-22

    Preparatory work for the new version of VDE 0188 is reviewed. The major modifications in parts 1 and 2 are mentioned in particular the changes in operating conditions which have been considered and the modified definitions of clean rooms, earthing, underground protective wire system, and mobile operating equipment. Part 2 discusses operating equipment such as motors, inductive voltage transformers, transformers, condensers, lines, lighting units and underground short circuit protection. Part 3 - intrinsically safe electrical equipment, auxiliary circuits, telecommunication systems - will be discussed in a sequel article in Glueckauf.

  7. 30 CFR 77.1707 - First aid equipment; location; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First aid equipment; location; minimum... OF UNDERGROUND COAL MINES Miscellaneous § 77.1707 First aid equipment; location; minimum requirements. (a) Each operator of a surface coal mine shall maintain a supply of the first aid equipment set forth...

  8. Engineering study of riser equipment contamination

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Study was to evaluate the current equipment and operating procedures to determine if changes could be made to improve ALARA and evaluate the feasibility of implementing the proposed solutions. As part of this study input from the cognizant characterization engineers and operating sampling crews was obtained and evaluated for ALARA improvements

  9. [Determining biomedical equipment calibration in health care Institutions in the Risaralda Department of Colombia].

    Science.gov (United States)

    López-Isaza, Giovanni A; Llamosa-Rincón, Luis E

    2008-01-01

    Determining quality features related to tracking biomedical equipment calibration patterns and their electrical safety as implemented by Health Care Institutions in the Risaralda department. This was a descriptive study using non-probabilistic sampling and the criterion of a greater equipment inventory and service demand for Clinics, Aesthetic, Radiology and Dentistry Centres and Hospitals. Census; the instrument was applied to 32 health-care institutions distributed throughout the Risaralda departments 14 municipalities between September 2005 and January 2006. Hospitals was the category having a highest number of electro-medical equipment (56%). Pereira (the capital of Risaralda) had 81% of all electro-medical equipment. All the institutions lacked NTC-ISO-IEC-17025 accreditation regarding standards certified by the Superintendence of Industry and Commerce. None of the institutions externally contracted by the institutions being surveyed was accredited. There is a public health risk in the Risaralda department; all health-care institutions lacked NTC-ISO-IEC-17025 accreditation and external institutions (in turn being hired by them for calibrating their equipment) also lacked accreditation. Based on the information obtained from non-calibrated equipment having international patterns, there is a great danger that determining the quality of biomedical equipment calibration patterns may be erroneous. It also places health-care institutions at a competitive disadvantage when compared to other accredited institutions in Colombia or in other countries.

  10. Development of a telerobotic system for handling contaminated process equipment

    International Nuclear Information System (INIS)

    Fisher, J.J.; Ward, C.R.; Schuler, T.F.

    1987-01-01

    E. I. du Pont de Nemours and Company is evaluating a unique eight-degree-of-freedom Telerobot manipulator to perform size-reduction and material handling operations on contaminated process equipment at the Savannah River Plant (SRP). The Telerobot will be installed in the proposed Transuranic (TRU) Waste Processing Facility, which is scheduled to be operational by 1990. A full-scale prototype Telerobot, manufactured by GCA Corporation, St. Paul, MN is being tested with other process equipment in the Components Test Facility at the Savannah River Laboratory (SRL). All telerobotic operations required in the TRU Waste Facility such as crate unpacking, equipment dismantling, material size-reduction, and selected maintenance operations are being tested. This paper discusses the major mechanical and control features of the Telerobot system. Several system enhancements were added by SRL, including a new quick-hand-change coupling and expanded software control functions. The new software enables a system operator to perform both teleoperated and automatic tasks through several operating modes. These enhancements, as well as future mechanical, control system, and software features, are reviewed

  11. Preventive Rad/Nuc Detection Equipment Categorization for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, B. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Musolino, S. V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Klemic, G. [US Dept. of Homeland Security National Security Technology Lab., New York, NY (United States)

    2017-06-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection equipment (PRND) to provide state and local agencies with guidance on how to best use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed for detection and interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management response take place. This effort will provide scientific guidance on the best way to deploy and operate this class of equipment for consequence management missions. With the support of the US Department of Homeland Security’s (DHS) Domestic Nuclear Detection Office (DNDO), PRND equipment has been placed into service at federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be repurposed to support the emergency response in the aftermath of a radiological of nuclear event. This report evaluates PRND equipment to define key categories of equipment and the types of missions they can be used for. This is important because there are over 100 different types of PRND equipment, often with significantly different capabilities with respect to the consequence management mission. The current DNDO draft NIMS PRND equipment types were used as a foundation and expanded, when necessary, to address key characteristics important for the consequence mission. Table 1 provides a summary of the PRND instrument categories developed for this effort. Also included on the table are some common response mission detection equipment categories that will be used for capability comparisons.

  12. Implementation of the project of equipment reliability in the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Rios O, J. E.; Martinez L, A. G.

    2008-01-01

    A equipment is reliable if it fulfills the function for which was designed and when it is required. To implement a project of reliability in a nuclear power plant this associate to a process of continuous analysis of the operation, of the conditions and faults of the equipment. The analysis of the operation of a system, of the equipment of the same faults and the parts that integrate to equipment take to identify the potential causes of faults. The predictive analysis on components and equipment allow to rectify and to establish guides to optimize the maintenance and to guarantee the reliability and function of the same ones. The reliability in the equipment is without place to doubts a wide project that embraces from the more small component of the equipment going by the proof of the parts of reserve, the operation conditions until the operative techniques of analysis. Without place of doubt for a nuclear power plant the taking of decisions based on the reliability of their systems and equipment will be the appropriate for to assure the operation and reliability of the same one. In this work would appear the project of reliability its processes, criteria, indicators action of improvement and the interaction of the different disciplines from the Nuclear Power Plant of Laguna Verde like a fundamental point for it put in operation. (Author)

  13. Non-invasive system for monitoring of the manufacturing equipment

    Science.gov (United States)

    Mazăre, A. G.; Belu, N.; Ionescu, L. M.; Rachieru, N.; Misztal, A.

    2017-08-01

    The automotive industry is one of the most important industries in the world that concerns the economy and the world culture. High demand has resulted in increasing of the pressure on the production lines. In conclusion, it is required more careful in monitoring of the production equipment not only for maintenance but also for staff safety and to increase the quality of production. In this paper, we propose a solution for non-invasive monitoring of the industrial equipment operation by measuring the current consumption on energy supply lines. Thus, it is determined the utilization schedule of the equipment and operation mode. Based on these measurements, it’s built an activity report for that equipment, available to the quality management and maintenance team. The solution consists of the current measuring equipment, with self-harvesting capabilities and radio transceiver, and an embedded system which run a server. The current measuring equipment will transmit data about consumption of each energy supply network line where is placed the industrial equipment. So, we have an internal measuring radio network. The embedded system will collect data for the equipment and put in a local data base and it will provide via an intranet application. The entire system not requires any supplementary energy supply and interventions in the factory infrastructure. It is experimented in a company from the automotive industries.

  14. 30 CFR 75.503-1 - Statement listing all electric face equipment.

    Science.gov (United States)

    2010-07-01

    ... all electric face equipment being used at each mine as of the time of filing, all such equipment being... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall...

  15. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  16. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  17. 21 CFR 1020.32 - Fluoroscopic equipment.

    Science.gov (United States)

    2010-04-01

    ... manufacturer shall provide to users, under § 1020.30(h)(1)(i), precautions concerning the importance of remote... specified in § 1020.32(d)(1)(v). (iii) Equipment provided with both an AERC mode and a manual mode shall not... shall be operable only when continuous manual activation is provided by the operator. A continuous...

  18. Justification of parameters and selection of equipment for laboratory researches of a rammer's operating element dynamics in a soil foundation of a tank for oil and oil products storage

    Science.gov (United States)

    Gruzin, A. V.; Gruzin, V. V.; Shalay, V. V.

    2017-08-01

    The development of technology for a directional soil compaction of tank foundations for oil and oil products storage is a relevant problem which solution will enable simultaneously provide required operational characteristics of a soil foundation and reduce time and material costs to prepare the foundation. The impact dynamics of rammers' operating elements on the soil foundation is planned to specify in the course of laboratory studies. A specialized technique is developed to justify the parameters and select the equipment for laboratory researches. The usage of this technique enabled us to calculate dimensions of the models, of a test bench and specifications of the recording equipment, and a lighting system. The necessary equipment for laboratory studies was selected. Preliminary laboratory tests were carried out. The estimate of accuracy for planned laboratory studies was given.

  19. Operation control equipment for BWR type reactor

    International Nuclear Information System (INIS)

    Izumi, Masayuki; Takeda, Renzo.

    1981-01-01

    Purpose: To improve the temperature balance in a feedwater heater by obtaining the objective value of a feedwater enthalpy upon calculation of respective measured values and controlling the opening or closing of an extraction valve so that the objective value may coincide with the measured value, thereby averaging the axial power distribution. Constitution: A plurality of stages of extraction lines are connected to a turbine, and extraction valves are respectively provided at the lines. By calculating the measured values of ractor pressure, reactor core flow rate, vapor flow rate and reactor core inlet enthalpy determined to predetermined value using heat balance the objective feedwater enthalpy is obtained, is fed as an extraction valve opening or closing signal from a control equipment, the extraction stages of the turbine extraction are altered in accordance with this signal, and the feedwater enthalpy is controlled. (Sekiya, K.)

  20. Guide to good practices for equipment and piping labeling

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Equipment and Piping Labeling, Chapter XVIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing labeling programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Equipment and Piping Labeling is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated labeling program to promote safe and efficient operations.

  1. Prophylactic and thermovision measurements of electric machines and equipment

    International Nuclear Information System (INIS)

    Jedlicka, R.; Brestovansky, L.

    1996-01-01

    High-voltage measurements of generators, unit and service transformers and some significant motor drives used at a nuclear power plant are described in this paper. Thermovision measurements of electric machines and distribution systems are dealt with in the second part of the paper. Power electric equipment represent one of the most significant components of a nuclear power plant. Turbine mechanical energy is converted into the electrical energy within these equipment. Power generated by generators is transformed by transformers so that it can achieve appropriate parameters for both the transmission over the distribution system and the power plant service power supply. The service power supply switchboards and cables provide supply to motors and other consumers necessary for the nuclear power plant technological process. The whole complex of equipment has to be maintained in good technical conditions. It is necessary to make thermovision and prophylactic measurements to identify and verify the electric equipment technical condition. The mentioned measurements warn the operation staff in advance against both gradual deterioration of power connection contact resistances, i.e. power connections overheating, and the machine insulation systems condition deterioration. The operation staff try to prevent the electric equipment operation accidents by early removing the detected failures, thus, improving the nuclear safety. In order to provide the above-mentioned activities a special prophylactic measurement group was established at the NPP Bohunice in 1983. The group specialists make following types of measurements. 1. Prophylactic measurements of electric machines. Prophylactics of 220 MW generators and 6 MW service power generators; Prophylactics of both unit and service transformers and VHV bushings; Prophylactics of major 6 kV motor drives. 2. Thermovision measurements of current connections. Measurements enumarated in paragraph 1 are made on disconnected electric

  2. 47 CFR 76.630 - Compatibility with consumer electronics equipment.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Compatibility with consumer electronics equipment. 76.630 Section 76.630 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST... Compatibility with consumer electronics equipment. (a) Cable system operators shall not scramble or otherwise...

  3. Metallographic examination of fire damages in electronic equipment; Metallographische Untersuchung von Brandschaeden in der Elektronik

    Energy Technology Data Exchange (ETDEWEB)

    Reiter, Katja; Puls, Sebastian [Fraunhofer Institut fuer Siliziumtechnologie, Itzehoe (Germany)

    2017-08-01

    Defects in electronic components and defects caused by electronic components are a frequent cause of fire damage. 35 % of examined cases of fire damage are found to be caused by electrical equipment or by the handling of electricity. Fire damage caused by electronic elements and in electronic assemblies may have a multitude of causes. Minor damages occurring during the manufacture of electronic components and assemblies can lead to operational disruptions in electronic devices and to life-threatening situations. In order to reconstruct a fire damage, a complex failure analysis and comprehensive knowledge of the principle of operation of the devices is required. Metallographic target preparation serves to detect and describe faults. Some damage patterns taken from practice are presented and analyzed here.

  4. 30 CFR 250.617 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.617 Section... Tubing and wellhead equipment. The lessee shall comply with the following requirements during well-workover operations with the tree removed: (a) No tubing string shall be placed in service or continue to...

  5. Bionic design methodology for wear reduction of bulk solids handling equipment

    NARCIS (Netherlands)

    Chen, G.; Schott, D.L.; Lodewijks, G.

    2016-01-01

    Large-scale handling of particulate solids can cause severe wear on bulk solids handling equipment surfaces. Wear reduces equipment life span and increases maintenance cost. Examples of traditional methods to reduce wear of bulk solids handling equipment include optimizing transport operations

  6. Methodology development for availability improvement of standby equipment

    International Nuclear Information System (INIS)

    Shin, Sung Min; Jeon, In Seop; Kang, Hyun Gook

    2014-01-01

    The core damage frequency (CDF) of operating and constructing pressurized nuclear plants are ranging on the order of 10 -5 and 10 -6 per year. The target CDF of new NPP design has been set at 10 -7 . In this context, although various systems are currently studied, availability improvement of standby equipment will be more efficient than the additional application of safety systems. It is obvious in every aspect, such as management and cost efficiency. Here, soundness can affect equipment unavailability, and the soundness degrades because of aging. However, some studies did not consider aging when calculating the unavailability. Standby equipment can age because of two important factors: standby stress which accumulates over time, and test stress which accumulates with the number of tests (or operations). Both factors should be considered together when aging is considered. However, some studies only considered standby stress or test stress. There are some previous studies which considered both factors. Besides equipment soundness related to aging effect, some process like bypass during test also can affect equipment unavailability because the original function of equipment cannot be performed immediately during this process. However, there are seldom studies dealing with above factors as a whole problem. This study investigated a general approach to calculate the unavailability of standby equipment which considers aging caused by standby and test stresses and bypass process. Based on this general approach, we propose two maintenance strategies which aim to reduce standby equipment unavailability. In section 2, the general approach is presented. As one of the strategies, the changing test interval method (CIM) is introduced in section 3, and its effectiveness is also analyzed. The online monitoring method (OMM) is investigated in section 4 as another method to reduce equipment unavailability. In section 5, a combination of these two methods is analyzed. A general

  7. Optimal Equipment Investments for Northern Plains Grain Farms

    OpenAIRE

    Terrance Jalbert; Mercedes Jalbert; James E. Briley

    2010-01-01

    This case presents a teaching tool which requires students to identify an optimal equipment plan for a northern plains small grain farm. Students are presented with information from a farm owner regarding farm size, available labor, farming techniques used and other relevant issues. Students are required to analyze this information to identify the equipment necessary to operate the farm. Students must balance equipment costs and labor issues. They must develop a plan that remains within a pre...

  8. Mission Analysis for Using Preventive Radiological/Nuclear Detection Equipment for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, Brooke R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wood-Zika, Annmarie R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Haynes, Daniel [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Klemic, Gladys A. [US Dept. of Homeland Security National Urban Security Technology Lab., Manhattan, NY (United States); Musolino, Stephen V. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection (PRND) equipment to provide state and local agencies with scientific guidance on how to effectively use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed by technology manufacturers and purchased by responders for preventive detection and source interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management (CM) response take place, as it is currently the most widely available and fielded radiological instrumentation by state and local agencies. This effort will provide scientific guidance on the most effective way to utilize this class of equipment for consequence management missions. Gaining a better understanding of how PRND equipment can operate and perform for these missions will allow for recommendations on the tactical approach responders can use for consequence management operations. PRND equipment has been placed into service by federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be leveraged to support the emergency response in the aftermath of a radiological or nuclear event. With several hundred makes and models of PRND equipment, often with significantly different detection capabilities that do not align with their nominal PRND equipment type, development of a streamlined categorization scheme with respect to consequence management missions was the first step to identifying safe and effective uses of PRND equipment for radiological/nuclear incident response.

  9. 14 CFR 101.35 - Equipment and marking requirements.

    Science.gov (United States)

    2010-01-01

    ... unmanned free balloon unless— (1) It is equipped with at least two payload cut-down systems or devices that operate independently of each other; (2) At least two methods, systems, devices, or combinations thereof... envelope; and (3) The balloon envelope is equipped with a radar reflective device(s) or material that will...

  10. Plutonium finishing plant safety systems and equipment list

    International Nuclear Information System (INIS)

    Bergquist, G.G.

    1995-01-01

    The Safety Equipment List (SEL) supports Analysis Report (FSAR), WHC-SD-CP-SAR-021 and the Plutonium Finishing Plant Operational Safety Requirements (OSRs), WHC-SD-CP-OSR-010. The SEL is a breakdown and classification of all Safety Class 1, 2, and 3 equipment, components, or system at the Plutonium Finishing Plant complex

  11. Assessment of electrical equipment aging for nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    The electrical and instrumentation equipments, especially whose parts are made of polymer material, are gradually degraded by thermal and radiation environment in the normal operation, and the degradation is thought to progress rapidly when they are exposed to the environment of the design basis event (DBE). The integrity of the equipments is evaluated by the environmental qualification (EQ) test simulating the environment of the normal operation and the DBE. The project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) indicated the importance of applying simultaneous thermal and radiation aging for simulating the aging in normal operation. The project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008 to apply the outcome of ACA to the other electrical and instrumentation equipment and to establish an advanced EQ test method that can appropriately simulate the environment in actual plants. In FY2012, aging characteristics of thermal aging and simultaneous aging were obtained for the epoxy resin of electrical penetrations and the O-ring of connectors. Physical property measurement was carried out for epoxy resin of electrical penetration subject to the type testing in FY2010. (author)

  12. Assessment of electrical equipment aging for nuclear power plant

    International Nuclear Information System (INIS)

    2013-01-01

    The electrical and instrumentation equipments, especially whose parts are made of polymer material, are gradually degraded by thermal and radiation environment in the normal operation, and the degradation is thought to progress rapidly when they are exposed to the environment of the design basis event (DBE). The integrity of the equipments is evaluated by the environmental qualification (EQ) test simulating the environment of the normal operation and the DBE. The project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) indicated the importance of applying simultaneous thermal and radiation aging for simulating the aging in normal operation. The project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008 to apply the outcome of ACA to the other electrical and instrumentation equipment and to establish an advanced EQ test method that can appropriately simulate the environment in actual plants. In FY2012, aging characteristics of thermal aging and simultaneous aging were obtained for the epoxy resin of electrical penetrations and the O-ring of connectors. Physical property measurement was carried out for epoxy resin of electrical penetration subject to the type testing in FY2010. (author)

  13. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  14. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  15. Waste Handling Equipment Development Test and Evaluation Study

    International Nuclear Information System (INIS)

    R.L. Tome

    1998-01-01

    The purpose of this study is to identify candidate Monitored Geologic Repository (MGR) surface waste handling equipment for development testing. This study will also identify strategies for performing the development tests. Development testing shall be implemented to support detail design and reduce design risks. Development testing shall be conducted to confirm design concepts, evaluate alternative design concepts, show the availability of needed technology, and provide design documentation. The candidate equipment will be selected from MGR surface waste handling equipment that is the responsibility of the Management and Operating Contractor (M and O) Surface Design Department. The equipment identified in this study is based on Viability Assessment (VA) design. The ''Monitored Geologic Repository Test and Evaluation Plan'' (MGR T and EP), Reference 5.1, was used as a basis for this study. The MGR T and EP reflects the extent of test planning and analysis that can be conducted, given the current status of the MGR requirements and latest VA design information. The MGR T and EP supports the appropriate sections in the license application (LA) in accordance with 10 CFR 60.2 1(c)(14). The MGR T and EP describes the following test activities: site characterization to confirm, by test and analysis, the suitability of the Yucca Mountain site for housing a geologic repository; development testing to investigate and document design concepts to reduce risk; qualification testing to verify equipment compliance with design requirements, specifications, and regulatory requirements; system testing to validate compliance with MGR requirements, which include the receipt, handling, retrieval, and disposal of waste; periodic performance testing to verify preclosure requirements and to demonstrate safe and reliable MGR operation; and performance confirmation modeling, testing, and analysis to verify adherence to postclosure regulatory requirements. Development test activities can be

  16. Method of Data storing, collection and aggregation for definition of life-cycle resources of electromechanical equipment

    Science.gov (United States)

    Zhukovskiy, Y.; Koteleva, N.

    2017-10-01

    Analysis of technical and technological conditions for the emergence of emergency situations during the operation of electromechanical equipment of enterprises of the mineral and raw materials complex shows that when developing the basis for ensuring safe operation, it is necessary to take into account not only the technical condition, but also the non-stationary operation of the operating conditions of equipment, and the nonstationarity of operational operating parameters of technological processes. Violations of the operation of individual parts of the machine, not detected in time, can lead to severe accidents at work, as well as to unplanned downtime and loss of profits. That is why, the issues of obtaining and processing Big data obtained during the life cycle of electromechanical equipment, for assessing the current state of the electromechanical equipment used, timely diagnostics of emergency and pre-emergency modes of its operation, estimating the residual resource, as well as prediction the technical state on the basis of machine learning are very important. This article is dedicated to developing the special method of data storing, collection and aggregation for definition of life-cycle resources of electromechanical equipment. This method can be used in working with big data and can allow extracting the knowledge from different data types: the plants’ historical data and the factory historical data. The data of the plants contains the information about electromechanical equipment operation and the data of the factory contains the information about a production of electromechanical equipment.

  17. Oil and gas products and energy equipment

    International Nuclear Information System (INIS)

    1996-01-01

    The planned activities of the Canadian oil and gas products and energy equipment industry for 1996-1997, were presented. The sector is made up of approximately 1500 small and medium sized enterprises. The Canadian oil field manufacturing and servicing industry holds only a small 2.5% share of the world export market, but it is recognized internationally as one of the leading suppliers of advanced petroleum equipment. Their exports include specialized equipment for extracting oil sands, gathering and treatment facilities for sour gas, underbalanced drilling technologies, equipment for wells experiencing declining production rates, top motor drives, winter drilling rigs, and horizontal drilling technologies. They also offer petroleum industry software products. Most exploration and production equipment sold abroad by Canadian firms is manufactured in Canada, but there is an increasing trend toward manufacturing in the country of operation. 2 tabs

  18. Discrete-continuous analysis of optimal equipment replacement

    OpenAIRE

    YATSENKO, Yuri; HRITONENKO, Natali

    2008-01-01

    In Operations Research, the equipment replacement process is usually modeled in discrete time. The optimal replacement strategies are found from discrete (or integer) programming problems, well known for their analytic and computational complexity. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. Then the optimal replacement is determined via the opt...

  19. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  20. The Impact of Operating Room Layout on Circulating Nurse's Work Patterns and Flow Disruptions: A Behavioral Mapping Study.

    Science.gov (United States)

    Bayramzadeh, Sara; Joseph, Anjali; San, Dee; Khoshkenar, Amin; Taaffe, Kevin; Jafarifiroozabadi, Roxana; Neyens, David M

    2018-01-01

    To assess how the adjacencies of functionally different areas within operating rooms (ORs) can influence the circulating nurse's (CN) workflow patterns and disruptions. The CN plays a significant role in promoting patient safety during surgical procedures by observing, monitoring, and managing potential threats at and around the surgical field. Their work requires constant movement to different parts of the OR to support team members. The layout of the OR and crowded and cluttered environment might impact the CN's workflow and cause disruptions during the surgery. A convenience sample of 25 surgeries were video recorded and thematically coded for CN's activities, locations, and flow disruptions. The OR layout was categorized into transitional zones and functional zones (workstations, supply zones, support zones, and sterile areas around the surgical table). CN's activities were classified into patient-, equipment-, material-, and information-related activities. Flow disruptions included those related to environmental hazards and layout. The CN traveled through multiple zones during 91% of the activities. The CN's workstation acted as a main hub from which the CN made frequent trips to both sides of the surgical table, the foot of the OR table, supply zones, and support zones. Transitional zones accounted for 58.3% of all flow disruption that the CN was involved in whereas 28% occurred in areas surrounding the OR bed. The similarity of the movement and flow disruption patterns, despite variations in OR layout, highlighted the adjacencies required between major zones that CNs regularly visit. These optimum adjacencies should be considered while designing ORs such that they are more efficient and safer.

  1. Specific developed phantoms and software to assess radiological equipment image quality

    International Nuclear Information System (INIS)

    Verdu, G.; Rodenas, F.

    2011-01-01

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be automatized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques, etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (mAs). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (author)

  2. Specific developed phantoms and software to assess radiological equipment image quality

    Energy Technology Data Exchange (ETDEWEB)

    Verdu, G., E-mail: gverdu@iqn.upv.es [Universidad Politecnica de Valencia (Spain). Dept. de Ingenieria Quimica y Nuclear; Mayo, P., E-mail: p.mayo@titaniast.com [TITANIA Servicios Teconologicos, Valencia (Spain); Rodenas, F., E-mail: frodenas@mat.upv.es [Universidad Politecnica de Valencia (Spain). Dept. de Matematica Aplicada; Campayo, J.M., E-mail: j.campayo@lainsa.com [Logistica y Acondicionamientos Industriales S.A.U (LAINSA), Valencia (Spain)

    2011-07-01

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be automatized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques, etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (mAs). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (author)

  3. A modularized operator interface framework for Tokamak based on MVC design pattern

    International Nuclear Information System (INIS)

    Yin, Xuan; Zheng, Wei; Zhang, Ming; Zhang, Jing; Zhuang, G.; Ding, T.

    2014-01-01

    Highlights: • Our framework is based on MVC design pattern. • XML is used to cope with minor difference between different applications. • Functions dealing with EPICS and MDSplus have been modularized into reusable modules. • The modularized framework will shorten J-TEXT's software development cycle. - Abstract: Facing various and continually changing experimental needs, the J-TEXT Tokamak experiment requires home-made software applications developed for different sub-systems. Though dealing with different specific problems, these software applications usually share a lot of functionalities in common. With the goal of improving the productivity of research groups, J-TEXT has designed a C# desktop application framework which is mainly focused on operator interface development. Following the Model–View–Controller (MVC) design pattern, the main functionality dealing with Experimental Physics and Industrial Control System (EPICS) or MDSplus has been modularized into reusable modules. Minor difference among applications can be coped with XML configuration files. In this case, developers are able to implement various kinds of operator interface without knowing the implementation details of the bottom functions in Models, mainly focusing on Views and Controllers. This paper presents J-TEXT C# desktop application framework, introducing the technology of fast development of the modularized operator interface. Some experimental applications designed in this framework have been already deployed in J-TEXT, and will be introduced in this paper

  4. Visual symptomatology and referral patterns for Operation Iraqi Freedom and Operation Enduring Freedom veterans with traumatic brain injury.

    Science.gov (United States)

    Bulson, Ryan; Jun, Weon; Hayes, John

    2012-01-01

    Advances in protective armor technology and changes in the "patterns of war" have created a population of Operation Iraqi Freedom/Operation Enduring Freedom (OIF/OEF) veterans with traumatic brain injury (TBI) that provide a unique challenge to Department of Veterans Affairs (VA) healthcare practitioners. The purpose of the study was to determine the frequency of symptomatic ocular and visual sequelae of TBI in OIF/OEF veterans at the Portland VA Medical Center, a Polytrauma Support Clinic Team site. A retrospective analysis of 100 OIF/OEF veterans with TBI was conducted to determine the prevalence of ocular and visual complaints. Referral patterns were also investigated. Visual symptoms were reported in approximately 50% of veterans with TBI. Loss of consciousness, but not number of deployments or number of blast exposures, was found to have a statistically significant association with severity of reported visual symptoms. The most commonly reported symptoms included blurred vision (67%), photosensitivity (50%), and accommodative problems (40%). Visual symptoms of OIF/OEF veterans at the Portland VA Medical Center are reported at slightly lower rates than similar studies conducted at the Palo Alto and Edward Hines Jr VA facilities.

  5. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  6. The application and practice of predictive maintenance at CANDU equipment management

    International Nuclear Information System (INIS)

    Yu Guangting

    2014-01-01

    The equipment in Qinshan CANDU unit is characterized by large number and complex structure. Some equipment failure has no relation with the operation time, it is impossible to avoid the failure of these equipment only by periodical maintenance. To improve the equipment reliability, increase the equipment usability and decrease the maintenance cost, for important equipment related to nuclear safety and generating electricity, it is required to perform condition monitoring and the predictive maintenance (PdM). According to different characteristics of equipment, it is required to use suitable equipment condition monitoring method, content and frequency. In this way, some potential equipment failure can be found, preventive maintenance can be arranged in advance, and equipment maintenance management can be optimized. (author)

  7. [Design and Implementation of a Mobile Operating Room Information Management System Based on Electronic Medical Record].

    Science.gov (United States)

    Liu, Baozhen; Liu, Zhiguo; Wang, Xianwen

    2015-06-01

    A mobile operating room information management system with electronic medical record (EMR) is designed to improve work efficiency and to enhance the patient information sharing. In the operating room, this system acquires the information from various medical devices through the Client/Server (C/S) pattern, and automatically generates XML-based EMR. Outside the operating room, this system provides information access service by using the Browser/Server (B/S) pattern. Software test shows that this system can correctly collect medical information from equipment and clearly display the real-time waveform. By achieving surgery records with higher quality and sharing the information among mobile medical units, this system can effectively reduce doctors' workload and promote the information construction of the field hospital.

  8. Equipment of Thomson scattering measurement on DIVA plasma

    International Nuclear Information System (INIS)

    Yamauchi, Toshihiko; Kumagai, Katsuaki; Funahashi, Akimasa; Matoba, Thoru; Sengoku, Seio

    1980-02-01

    Equipment of Thomson scattering measurement using ruby-laser light is explained. DIVA device was shut down in September 1979; it gave numerous fruitful experimental results during its five years operation. We measured the profiles of electron temperature and density with the Thomson scattering equipment, which played an important role in research of the energy confinement and heating characteristics. In Thomson scattering measurements on DIVA, studies and improvements were made for reduction of stray light, increase of measuring points and data processing. The profile of electron temperature and density were thus measured successful. In this report is given an over-all view of the Thomson scattering equipment together with the above improvements. As two representative examples, the measured results of electron temperature profiles on DIVA plasma under divertor operation and low-q discharge respectively are described. (author)

  9. Testing of FFTF fuel handling equipment

    International Nuclear Information System (INIS)

    Coleman, D.W.; Grazzini, E.D.; Hill, L.F.

    1977-07-01

    The Fast Flux Test Facility has several manual/computer controlled fuel handling machines which are exposed to severe environments during plant operation but still must operate reliably when called upon for reactor refueling. The test programs for two such machines--the Closed Loop Ex-Vessel Machine and the In-Vessel Handling Machine--are described. The discussion centers on those areas where design corrections or equipment repairs substantiated the benefits of a test program prior to plant operation

  10. Proceedings of the 11. annual mining industry learning seminar : 2006 equipment evolutions

    Energy Technology Data Exchange (ETDEWEB)

    Joseph, T. [Alberta Univ., Edmonton, AB (Canada). School of Mining and Petroleum Engineering] (comp.)

    2006-07-01

    This seminar provided a forum for mine engineers, geologists, operators, vendors and academics to discuss various topics on equipment evolution that address mining industry concerns. Participants included those who are involved in mine planning, equipment selection, operations and maintenance. The presentations identified possible solutions to ongoing issues and alternative technologies emerging in the mining industry. Operators and original equipment manufacturers shared their innovations in novel developments and presented solutions to issues relevant to mining processes including truck and shovel technology issues such as tires, lube and fuel emissions. The seminar featured 17 presentations, of which 5 have been catalogued separately for inclusion in this database. tabs., figs.

  11. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  12. 21 CFR 226.30 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contamination, including cross-contamination from manufacturing operations. (d) Be suitably grounded... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment. 226.30 Section 226.30 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL...

  13. Equipment: Antenna systems

    Science.gov (United States)

    Petrie, L. E.

    1986-03-01

    Some antenna fundamentals as well as definitions of the principal terms used in antenna engineering are described. Methods are presented for determining the desired antenna radiation patterns for HF communication circuit or service area. Sources for obtaining or computing radiation pattern information are outlined. Comparisons are presented between the measured and computed radiation patterns. The effect of the properties of the ground on the antenna gain and the pattern are illustrated for several types of antennas. Numerous examples are given of the radiation patterns for typical antennas used on short, intermediate and long distance circuits for both mobile and fixed service operations. The application of adaptive antenna arrays and active antennas in modern HF communication systems are briefly reviewed.

  14. Uncertainty in particle number modal analysis during transient operation of compressed natural gas, diesel, and trap-equipped diesel transit buses.

    Science.gov (United States)

    Holmén, Britt A; Qu, Yingge

    2004-04-15

    The relationships between transient vehicle operation and ultrafine particle emissions are not well-known, especially for low-emission alternative bus technologies such as compressed natural gas (CNG) and diesel buses equipped with particulate filters/traps (TRAP). In this study, real-time particle number concentrations measured on a nominal 5 s average basis using an electrical low pressure impactor (ELPI) for these two bus technologies are compared to that of a baseline catalyst-equipped diesel bus operated on ultralow sulfur fuel (BASE) using dynamometer testing. Particle emissions were consistently 2 orders of magnitude lower for the CNG and TRAP compared to BASE on all driving cycles. Time-resolved total particle numbers were examined in terms of sampling factors identified as affecting the ability of ELPI to quantify the particulate matter number emissions for low-emitting vehicles such as CNG and TRAP as a function of vehicle driving mode. Key factors were instrument sensitivity and dilution ratio, alignment of particle and vehicle operating data, sampling train background particles, and cycle-to-cycle variability due to vehicle, engine, after-treatment, or driver behavior. In-cycle variability on the central business district (CBD) cycle was highest for the TRAP configuration, but this could not be attributed to the ELPI sensitivity issues observed for TRAP-IDLE measurements. Elevated TRAP emissions coincided with low exhaust temperature, suggesting on-road real-world particulate filter performance can be evaluated by monitoring exhaust temperature. Nonunique particle emission maps indicate that measures other than vehicle speed and acceleration are necessary to model disaggregated real-time particle emissions. Further testing on a wide variety of test cycles is needed to evaluate the relative importance of the time history of vehicle operation and the hysteresis of the sampling train/dilution tunnel on ultrafine particle emissions. Future studies should

  15. Metal layer mask patterning by force microscopy lithography

    International Nuclear Information System (INIS)

    Filho, H.D. Fonseca; Mauricio, M.H.P.; Ponciano, C.R.; Prioli, R.

    2004-01-01

    The nano-lithography of a metallic surface in air by atomic force microscopy while operated in contact mode and equipped with a diamond tip is presented. The aluminum mask was prepared by thermal deposition on arsenic sulfide films. The analysis of the scratches performed by the tip on the metallic mask show that the depth of the lithographed pattern increases with the increase of the applied normal force. The scanning velocity is also shown to influence the AFM patterning process. As the scanning velocity increases, the scratch depth and width decreases. Nano-indentations performed with the diamond tip show that the plastically deformed surface increases with the increase of the duration of the applied force. The use of the nano-lithography method to create nano-structures is discussed

  16. The Use of Noise Dampening Mats to Reduce Heavy-Equipment Noise Exposures in Construction

    Directory of Open Access Journals (Sweden)

    Sabah Saleh

    2017-06-01

    Full Text Available The performance of sound barriers was evaluated to determine their technical effectiveness and practicality in reducing noise exposures to operating engineers in construction. Commercially purchased sound dampening mats (SDMats were installed inside three heavy-equipment engine compartments. Sound pressure levels (SPLs were measured before and after installing the SDMats while the equipment was on idle and full-throttle settings where it normally operates. SPLs inside the heavy-equipment operator cabs were significantly reduced by 5.6–7.6 dBA on the full-throttle setting following installation of the SDMats (p<0.01. The evaluated engineering control intervention was simple to install, affordable, and substantially reduced the engine noise reaching the heavy-equipment operator, potentially reducing reliance on hearing-protection devices to protect construction workers from noise exposures.

  17. Development of Partial Discharging Simulation Test Equipment

    Science.gov (United States)

    Kai, Xue; Genghua, Liu; Yan, Jia; Ziqi, Chai; Jian, Lu

    2017-12-01

    In the case of partial discharge training for recruits who lack of on-site work experience, the risk of physical shock and damage of the test equipment may be due to the limited skill level and improper operation by new recruits. Partial discharge simulation tester is the use of simulation technology to achieve partial discharge test process simulation, relatively true reproduction of the local discharge process and results, so that the operator in the classroom will be able to get familiar with and understand the use of the test process and equipment.The teacher sets up the instrument to display different partial discharge waveforms so that the trainees can analyze the test results of different partial discharge types.

  18. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  19. Planning of maintenance of electrical equipment in nuclear plants/laboratories [Paper No.: VB-3

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Bhattacharyya, A.K.

    1981-01-01

    Satisfactory operating performance of electrical systems ensures continuous availability of power to the various plants and machinery in nuclear plant and laboratories. For effective optimal functioning of the electrical equipment and to reduce their down time, scheduled planning of maintenance to the equipment is essential. Maintenance of power plant, nuclear or fossil, and industrial plant and research laboratories demands essential ingredients such as right type of trained and motivated technical personnel, adoption of standard procedures for maintenance, adequate safety and protection for equipment, safety procedures adopted in the installation to prevent hazards to the workers, provision of adequate stores and inventories, facilities for quick repairs and testing of equipment and effective planning of procedures for their maintenance. While breakdown maintenance allows equipment to operate before it is repaired or replaced, preventive maintenance makes use of scheduled inspection and periodical equipment overhaul and has little value for predicting future continuous performances of equipment. The engineered maintenance is most advantageous and offers maximum operating time to reduce down time of the equipment while adding predictive testing technique to aid in determining the frequency of overhaul of equipment. The important checks to be conducted and preventive maintenance programme to be scheduled are discussed in this paper. The safety and reliable functioning of the electrical equipment depend on proper optimal design, selection of equipment, their installation, subsequent maintenance and strict compliance with safety regulations. (author)

  20. An analysis of USMC heavy construction equipment (HCE) requirements

    OpenAIRE

    Blaxton, Allen C.; Fay, Michael J.; Hansen, Cheryl M.; Zuchristian, Christopher M.

    2003-01-01

    MBA Professional Report Approved for public release; distribution is unlimited. According to I and L, HQMC, the Marine Corps needs to re-evaluate current operational requirements for engineer construction equipment. Acquisition and force allocation levels for equipment have remained essentially at constant 1970's, Cold War levels. Because acquisition and allocation levels haven't changed at the same rate as personnel, there is a perception that much of the existing equipment is unnecess...

  1. Recommended safety procedures for the selection, installation and use of baggage inspection x-ray equipment

    International Nuclear Information System (INIS)

    1978-05-01

    Good X-ray equipment alone will not preclude unnecessary exposure to x-radiation. The equipment must be installed, maintained and used by adequately trained personnel, with due regard for the inherent hazards of such equipment and an appreciation of the need to observe proper operational procedures. It is the intent of this Code to define equipment specifications and conditions of installation and use for baggage inspection X-ray equipment, such that the hazard to operating personnel and the general public from such devices remains negligibly small. (auth)

  2. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    Energy Technology Data Exchange (ETDEWEB)

    Rossel, R.E., E-mail: ralf.erik.rossel@cern.ch [CERN, Geneva (Switzerland); Institut für Physik, Johannes Gutenberg-Universität, Mainz (Germany); Hochschule RheinMain, Fachbereich Design Informatik Medien, Wiesbaden (Germany); Fedosseev, V.N.; Marsh, B.A. [CERN, Geneva (Switzerland); Richter, D. [Hochschule RheinMain, Fachbereich Design Informatik Medien, Wiesbaden (Germany); Rothe, S. [CERN, Geneva (Switzerland); Institut für Physik, Johannes Gutenberg-Universität, Mainz (Germany); Wendt, K.D.A. [Institut für Physik, Johannes Gutenberg-Universität, Mainz (Germany)

    2013-12-15

    Highlights: • The requirements for continuous and automated RILIS operation are outlined. • Laser wavelength, power, beam position and pulse timing are continuously monitored. • A network-extended LabVIEW-based equipment operation framework was developed. • The system serves as a foundation for collaborative laser spectroscopy data acquisition. • Example applications have been successfully tested with ISOLDE experiment setups. -- Abstract: With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.

  3. An overview of equipment survivability studies at Sandia National Labs. (SNL): Chapter 3

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Craft, C.M.; McCulloch, W.H.; Sebrell, W.A.

    1983-01-01

    The USNRC sponsors a number of programs at Sandia National Laboratories (SNL) specifically addressing safety-related equipment survivability. The major thrust of these programs has been the physical testing of equipment. Test results illustrate the importance of a dedicated equipment design effort giving particular attention to the safety implications of the equipment operation. Several equipment survivability tests here have revealed equipment design and test-related deficiencies

  4. The difficult business model for mask equipment makers and mask infrastructure development support from consortia and governments

    Science.gov (United States)

    Hector, Scott

    2005-11-01

    The extension of optical projection lithography through immersion to patterning features with half pitch face the challenge of being profitable in the small market for mask equipment while encountering significant R&D expenses to bring new generations of mask fabrication equipment to market. The total available market for patterned masks is estimated to be $2.5B to $2.9B per year. The patterned mask market is about 20% of the market size for lithography equipment and materials. The total available market for mask-making equipment is estimated to be about $800M per year. The largest R&D affordability issue arises for the makers of equipment for fabricating masks where total available sales are typically less than ten units per year. SEMATECH has used discounted cash flow models to predict the affordable R&D while maintaining industry accepted internal rates of return. The results have been compared to estimates of the total R&D cost to bring a new generation of mask equipment to market for various types of tools. The analysis revealed that affordability of the required R&D is a significant problem for many suppliers of mask-making equipment. Consortia such as SEMATECH and Selete have played an important role in cost sharing selected mask equipment and material development projects. Governments in the United States, in Europe and in Japan have also helped equipment suppliers with support for R&D. This paper summarizes the challenging business model for mask equipment suppliers and highlight government support for mask equipment and materials development.

  5. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    International Nuclear Information System (INIS)

    1994-01-01

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs

  6. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs.

  7. Co-operation Equipment Qualification for Safety grade I and C Equipment between Russia and Korea

    International Nuclear Information System (INIS)

    Ham, J. K.; Lee, D. H.; Park, J. W.; Jeong, M. H.; Choi, Y. H.; Suh, J. J.; Jang, T. H.

    2007-06-01

    Equipment Qualification technology for I and C system on nuclear grade have been approved with accurate and safe for verifying and validation. It contributes to acknowledge of reliability and to review of user approval. Also it did not completely satisfied the requirement of Russia, it can be satisfied by bit of modification on design. It is expected to support the export of safety PLC to nuclear power plant. Proven EQ technology is required on the further markets of nuclear. Therefore, comparison test with foreign country is necessary to support the mutual accreditation of EQ for export of domestic products

  8. Co-operation Equipment Qualification for Safety grade I and C Equipment between Russia and Korea

    Energy Technology Data Exchange (ETDEWEB)

    Ham, J. K.; Lee, D. H.; Park, J. W.; Jeong, M. H.; Choi, Y. H.; Suh, J. J.; Jang, T. H. [Korea Testing Laboratory, Seoul (Korea, Republic of)

    2007-06-15

    Equipment Qualification technology for I and C system on nuclear grade have been approved with accurate and safe for verifying and validation. It contributes to acknowledge of reliability and to review of user approval. Also it did not completely satisfied the requirement of Russia, it can be satisfied by bit of modification on design. It is expected to support the export of safety PLC to nuclear power plant. Proven EQ technology is required on the further markets of nuclear. Therefore, comparison test with foreign country is necessary to support the mutual accreditation of EQ for export of domestic products.

  9. 30 CFR 75.1713-7 - First-aid equipment; location; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First-aid equipment; location; minimum... § 75.1713-7 First-aid equipment; location; minimum requirements. (a) Each operator of an underground coal mine shall maintain a supply of the first-aid equipment set forth in paragraph (b) of this § 75...

  10. Preparations for a major overhaul with equipment for semiautomtic operation on pipework in regions of high radiation dose in nuclear power stations

    International Nuclear Information System (INIS)

    Hoch, G.

    1979-01-01

    This paper presents equipment which can be used in the field of high radiation dose on pipeline. This comprises either semi or fully automatic operating machines for the segregation of pipeline, for the treatment of pipeline terminations (weld edges attachments, internal bores), for plating and welding, and also for the testing (ultrasonic and eddy-current testing) of pipelines. (orig./HP) [de

  11. After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

    2004-01-22

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in

  12. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  13. 46 CFR 197.314 - First aid and treatment equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false First aid and treatment equipment. 197.314 Section 197... HEALTH STANDARDS GENERAL PROVISIONS Commercial Diving Operations Equipment § 197.314 First aid and... consists of— (i) Basic first aid supplies; and (ii) Any additional supplies necessary to treat minor trauma...

  14. 10 CFR 434.404 - Building service systems and equipment.

    Science.gov (United States)

    2010-01-01

    ... requirements require 24-hour pump operation. 404.5.2Heated swimming pools shall be equipped with pool covers... 10 Energy 3 2010-01-01 2010-01-01 false Building service systems and equipment. 434.404 Section 434.404 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY CODE FOR NEW FEDERAL COMMERCIAL AND...

  15. Increasing efficiency and optimizing thermoelectric power plant equipment. Povyshenie effektivnosti i optimizatsiia teploenergeticheskikh ustanovok

    Energy Technology Data Exchange (ETDEWEB)

    Andriushchenko, A.I.

    1981-01-01

    The problems of increasing the efficiency and optimizing the operational conditions of a thermoelectric power plant and providing efficient operational conditions of the primary and auxillary equipment at a thermoelectric power plant are examined. Methodologies and designs for optimizing the primary parameters of the power-generating equipment based on economic factors are given. A number of recommendations for designing equipment based on the research results are given.

  16. From product to service orientation in the maritime equipment industry

    DEFF Research Database (Denmark)

    Matzen, Detlef; McAloone, Timothy Charles

    2008-01-01

    of their products in operation. In this paper we present a case study of a shipping equipment manufacturer that is currently shifting business focus from manufacturing towards services delivery. Using a modelling scheme to differentiate and categorise different development tasks within the frame of business......In the shipping industry, operational performance of ships and their equipment is crucial to business. Suppliers of machinery and equipment are aware of this situation and see business development potential in setting up service systems that are dedicated to ensuring the performance...... development towards service oriented business, the case delivers insights into the broader context and product related parameters influencing the options and requirements for service system development....

  17. A proposal of nuclear fusion power plant equipped with SMES

    International Nuclear Information System (INIS)

    Natsukawa, Tatsuya; Makamura, Hirokazu; Molinas, Marta; Nomura, Shinichi; Tsuji-Iio, Shunji; Shimada, Ryuichi

    2000-01-01

    When we intend to operate the nuclear fusion power plant (NFPP) under the economically efficient conditions as an independent power plant, it is desirable that the generated electric power should be sent to network according to the power demand. With such strategy being expanded, some energy storage system is available. In this paper, NFPP equipped with the superconducting magnetic energy storage system (SMES) as electric power storage device is proposed. The advantages of NFPP equipped with SMES are discussed and a case study of 500 MW NFPP equipped with 6 GWh SMES is done with estimating its operational value. For SMES coil, the concept of Force Balanced Coil (FBC) is applied and 6 GWh class FBC is briefly designed

  18. Equipment for the forecast and operating control of the natural catastrophes dynamics

    International Nuclear Information System (INIS)

    Kazansev, S.I.; Koblik, Yu.N.; Yuldashev, B.S.; Kuzhevskij, B.M.; Nechaev, O.Yu.

    2004-01-01

    Full text: Necessity of the solution of forecast the natural catastrophes such as: earthquakes, the volcanic activity stirring up, origin of the mud flows, landslides, sudden moving of pulsating glaciers, awesome atmospheric phenomena is realized a long time ago. However numerous attempts to find the solution yet have not yielded desirable result. Representative example to this is the absence to the present time of the physically justified earthquake forecast. Perennial observations of the Earth neutron field with the help of designed by us equipment, both in seismically active regions (Tien - Shan, Pamir, Kamchatka) and in seismically quiet regions (Moscow and Tver regions) demonstrated, that the variations of neutron radiation near the earth crust allow us to elaborate near-term (tens hours, some day) the earthquakes forecast. These researches have also revealed correlation between variations of neutron and magnetic fields of the Earth. In this connection it is represented, that a hardware complex permitting simultaneously to watch variations of a neutron radiation near the earth crust and variation of a magnetic field of the Earth will appear sufficient for the purposes of a short forecast of natural debacles and, besides will allow us to execute the operating control of temporary development of already happened event

  19. Equipment for the forecast and operating control of the natural catastrophes dynamics

    International Nuclear Information System (INIS)

    Kazantsev, S.I.; Koblik, Yu.N.; Yuldashev, B.S.; Kuzhevskij, B.M.; Nechaev, O.Yu.

    2004-01-01

    Necessity of the solution of forecast the natural catastrophes such as: earthquakes, the volcanic activity stirring up, origin of the mud flows, landslides, sudden moving of pulsating glaciers, awesome atmospheric phenomena is realized a long time ago. However numerous attempts to find the solution yet have not yielded desirable result. Representative example to this is the absence to the present time of the physically justified earthquake forecast. Perennial observations of the Earth neutron field with the help of designed by us equipment, both in seismically active regions (Tien - Shan, Pamir, Kamchatka) and in seismically quiet regions (Moscow and Tver regions) demonstrated, that the variations of neutron radiation near the earth crust allow us to elaborate near-term (tens hours, some day) the earthquakes forecast. These researches have also revealed correlation between variations of neutron and magnetic fields of the Earth. In this connection it is represented, that a hardware complex permitting simultaneously to watch variations of a neutron radiation near the earth crust and variation of a magnetic field of the Earth will appear sufficient for the purposes of a short forecast of natural debacles and, besides will allow us to execute the operating control of temporary development of already happened event. (author)

  20. ITER L 7 duct remote handling equipment design report

    International Nuclear Information System (INIS)

    Millard, J.

    1996-09-01

    The operation, design and interfaces of the 'Duct Vehicle' and it's associated remote handling equipment are briefly described in this document. This equipment is being designed by Spar Aerospace Ltd. for the Divertor Test Platform as part of ITER Research and Development Project L-7. Canadian Fusion Fuels Technology Project funds this work as part of the Canadian Contribution to ITER. This document describes the equipment design status at the September 1996 design review. 23 figs

  1. Research on Application of FMECA in Missile Equipment Maintenance Decision

    Science.gov (United States)

    Kun, Wang

    2018-03-01

    Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.

  2. The development of synthetic test procedure for hot cell equipment systems in IMEF

    International Nuclear Information System (INIS)

    Ahn, Sang Bok; Lee, Key Soon; Park, Dae Kyu; Hong, Kwon Pyo; Choo, Yong Sun

    1998-04-01

    Hot cell facility should be confirmed to operation safety through pre-commissioning test after construction. In this report, the detailed procedure of hot cell equipment are described. The contents are as follows: 1. Entrance equipment of hot cell 2. Specimen transportation equipment between hot cells 3. Waste discharge equipment in hot cell 4. Specimen loading equipment to hot cell 5. Interlinking equipment in hot cell. (author). 4 tabs

  3. DEVELOPMENT OF COMPLEX EQUIPMENT FOR PLASMA SPRAY CERAMIC COATINGS

    Directory of Open Access Journals (Sweden)

    V. V. Okovity

    2017-01-01

    Full Text Available Develop a set equipment for plasma forming ceramic coatings. The article presents characteristics and parameters of the developed complex equipment for formation of plasma ceramic coatings as well as results of its testing. Methods of research is based on studies of structural elements composite plasma coatings system ZrO2 – Y2O3  obtained  using  developed complex equipment. One of the most effective ways to protect the components from high temperature corrosion and oxidation is formation on the surface of plasma thermal barrier coatings. For thermal barrier coating has very strict requirements: сharacterized by a smooth change of physico-mechanical properties (porosity, microhardness, elastic modulus in the cross section of the metal substrate to the outer ceramic layer; to withstand multiple cycles of thermal cycling from room temperature to the operating temperature; to maintain gastightness under operating conditions and thus ensure a sufficiently high level of adhesive strength. For realization of new technological schemes applying thermal barrier coatings with high operational characteristics was developed, patented and manufactured a range of new equipment. The experiments show that authors developed PBG-1 plasmatron and powder feeder PPBG-04 have at least 2–3 times the service life during the deposition of ceramic materials compared to the standard equipment of the company "Plasma-Technik", by changing the structure of the cathode-anode plasma torch assembly and construction of the delivery unit of the feeder to facilitate the uniform supply of the powder into the plasma jet and the best of his penetration. The result is better plasma coatings with improved operational characteristics: adhesion strength is increased to 1.3–2 times, material utilization in 1.5–1.6 times microhardness 1.2–1.4 times the porosity is reduced by 2–2.5 times.

  4. AIR CONTAMINANT EXPOSURE DURING THE OPERATION OF LAWN AND GARDEN EQUIPMENT

    Science.gov (United States)

    The U.S. Environmental Protection Agency (EPA) initiated the Small Engine Exposure Study (SEES) to evaluate potential exposures among users of small, gasoline-powered, non-road spark-ignition (SI) lawn and garden engines. Equipment tested included riding tractors, walk-behind la...

  5. 77 FR 13173 - Best Equipped Best Served

    Science.gov (United States)

    2012-03-05

    ... on the best equipped, best performing, best served concept for implementation in the 2012-2014... Advisory Committee (NAC). FAA is seeking stakeholder input on the technical and operational feasibility of...

  6. A Perspective on Equipment Design for Fusion Remote Handling

    International Nuclear Information System (INIS)

    Mills, S.; Haist, B.; Hamilton, D.

    2006-01-01

    For 8 years, JET remote operations have become more capable and confident. Many tasks have been successfully completed, even those never intended to be remote maintenance activities. The general approach to the provision of remote handling equipment at JET has been the preferred use of commercially-off-the-shelf equipment. In the areas of electrical, electronic, software and control this approach has been generally achievable. However, in the area of mechanical equipment it has been more difficult. In particular the RH tooling has been almost entirely bespoke as its requirements are highly sensitive to the design of the JET component being handled and there are many design variations. Hence, JET has required the design and manufacture of over 700 types of bespoke RH equipment. This paper will discuss the experience of introducing and developing remote handling mechanical equipment for JET. The paper will cover the relationship between the remote handling equipment and the JET component design and the potential for improving the design function. A major lesson from the introduction of remote handling to JET has been demonstration of the very close interdependency of the design of JET components with design of remote handling tooling. The JET remote handling manual was originally introduced as the vehicle to ensure remote handling compatibility by the introduction of standards. Experience has shown that in general the remote handling manual approach has been insufficient. Future fusion machines will be much more complex than JET and will demand even greater remote handling compatibility. This paper will discuss possible methods for improving this process. Equipment operating in a high radiation environment must be dependable It may spend part of its time in areas that would be extremely difficult to recover from in the case of failure. The equipment may also have a high duty cycle to minimise shutdown times and probably cannot be manually inspected on a frequent

  7. The replacement of technically obsolete equipments

    International Nuclear Information System (INIS)

    Anglaret, Ph.; Patouillaud, M.

    1987-01-01

    The paper covers the analysis of procedures for replacement of technically obsolete but still operational equipments in use in a nuclear power plant. The Three Mile Island accident showed that operators in the control room reqire additional information at their disposal. In 1986 CGEE Alsthom received two orders for improvements to control systems, for the South African nuclear power plant Koeberg and the Dutch nuclear power plant Borssele. The new systems will provide support to normal operation and offer additional help in accident situations. 4 figs

  8. High temperature superconducting Maglev equipment on vehicle

    Science.gov (United States)

    Wang, S. Y.; Wang, J. S.; Ren, Z. Y.; Zhu, M.; Jiang, H.; Wang, X. R.; Shen, X. M.; Song, H. H.

    2003-04-01

    Onboard high temperature superconducting (HTS) Maglev equipment is a heart part of a HTS Maglev vehicle, which is composed of YBaCuO bulks and rectangle-shape liquid nitrogen vessel and used successfully in the first manned HTS Maglev test vehicle. Arrangement of YBaCuO bulks in liquid nitrogen vessel, structure of the vessel, levitation forces of a single vessel and two vessels, and total levitation force are reported. The first manned HTS Maglev test vehicle in the world has operated well more than one year after it was born on Dec. 31, 2000, and more than 23,000 passengers have taken the vehicle till now. Well operation of more than one year proves the reliability of the onboard HTS Maglev equipment.

  9. Results from the Operational Testing of the General Electric Smart Grid Capable Electric Vehicle Supply Equipment (EVSE)

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Richard Barney [Idaho National Lab. (INL), Idaho Falls, ID (United States); Scoffield, Don [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bennett, Brion [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-12-01

    The Idaho National Laboratory conducted testing and analysis of the General Electric (GE) smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from GE for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the GE smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionality testing, abnormal conditions testing, and charging of a plug-in vehicle.

  10. Performance Measurement of Mining Equipments by Utilizing OEE

    Directory of Open Access Journals (Sweden)

    Sermin Elevli

    2010-10-01

    Full Text Available Over the past century, open pit mines have steadily increased their production rate by using larger equipments which requireintensive capital investment. Low commodity prices have forced companies to decrease their unit cost by improving productivity. Oneway to improve productivity is to utilize equipment as effectively as possible. Therefore, the accurate estimation of equipmenteffectiveness is very important so that it can be increased. Overall Equipment Effectiveness (OEE is a well-known measurementmethod, which combines availability, performance and quality, for the evaluation of equipment effectiveness in manufacturing industry.However, there isn’t any study in literature about how to use this metric for mining equipments such as shovel, truck, drilling machineetc. This paper will discuss the application of OEE to measure effectiveness of mining equipment. It identifies causes of time losses forshovel and truck operations and introduces procedure to record time losses. The procedure to estimate OEE of shovels and trucks hasalso been presented via numerical example.

  11. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  12. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  13. Is It a Pattern?

    Science.gov (United States)

    McGarvey, Lynn M.

    2013-01-01

    This article describes how in early mathematics learning, young children are often asked to recognize and describe visual patterns in their environment--perhaps on their clothing, a toy, or the carpet; around a picture frame; or in the playground equipment. Exploring patterns in the early years is seen as an important introduction to algebraic…

  14. Equipment size effects on open pit mining performance

    Energy Technology Data Exchange (ETDEWEB)

    A. Bozorgebrahimi; R.A. Hall; M.A. Morin [University of British Columbia, Vancouver, BC (Canada). Mining Engineering Department

    2005-03-01

    This paper discusses the exploitation of economies of scale in open pit mining through the use of increasingly larger equipment. It presents a method adopted to evaluate the impact of increased scale on operational performance factors. The work identifies equipment size sensitive variables (ESSVs) in the mine design process that affect the performance of the production process. Data from a set of case studies show that the ESSV influence extends beyond mine production to encompass milling performance, environmental footprint and community impacts. Some ESSVs (such as reliability, tyre costs and productivity) are shown to be related to the current state of equipment technology and their effects are therefore comparable for different mines. Other ESSVs relate to the mine and deposit characteristics; their effects therefore vary from mine to mine. A detailed analytical approach, developed to model the impact of ESSVs, suggests that for truck/shovel operations, the industry may be approaching a situation of diseconomies of scale.

  15. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    International Nuclear Information System (INIS)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully

  16. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully.

  17. Operating the plant, quality assurance, and the job of the operating staff, Volume Twelve

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Subject matter includes operating the plant (the role of the operator, the control room, plant technical specifications, plant operating procedures, initial startup program, BWR/PWR plant startup, BWR/PWR steady state power operation, BWR/PWR transient operation, emergency operation), quality assurance (what is quality, what is quality control, quality assurance includes quality control, government regulation and quality assurance, administrative controls for nuclear power plants, the necessity of reviews and audits, practical quality assurance), and the job of the operating staff (the plant operating staff, plant safety, first aid and resuscitation, general plant hazards, personnel protective equipment, handling chemicals, handling compressed gas, equipment repair and maintenance, communicating with others

  18. Use of REMPI-TOFMS for real-time measurement of trace aromatics during operation of aircraft ground equipment

    Science.gov (United States)

    Gullett, Brian; Touati, Abderrahmane; Oudejans, Lukas

    Emissions of aromatic air toxics from aircraft ground equipment (AGE) were measured with a resonance enhanced multiphoton ionization-time of flight mass spectrometry (REMPI-TOFMS) system consisting of a pulsed solid state laser for photoionization and a TOFMS for mass discrimination. This instrument was capable of characterizing turbine emissions and the effect of varying load operations on pollutant production. REMPI-TOFMS is capable of high selectivity and low detection limits (part per trillion to part per billion) in real time (1 s resolution). Hazardous air pollutants and criteria pollutants were measured during startups and idle and full load operations. Measurements of compounds such as benzene, toluene, ethylbenzene, xylenes, styrene, and polycyclic aromatic hydrocarbons compared well with standard methods. Startup emissions from the AGE data showed persistent concentrations of pollutants, unlike those from a diesel generator, where a sharp spike in emissions rapidly declined to steady state levels. The time-resolved responses of air toxics concentrations varied significantly by source, complicating efforts to minimize these emissions with common operating prescriptions. The time-resolved measurements showed that pollutant concentrations decline (up to 5×) in a species-specific manner over the course of multiple hours of operation, complicating determination of accurate and precise emission factors via standard extractive sampling. Correlations of air toxic concentrations with more commonly measured pollutants such as CO or PM were poor due to the relatively greater changes in the measured toxics' concentrations.

  19. Applied Operations Research: Operator's Assistant

    Science.gov (United States)

    Cole, Stuart K.

    2015-01-01

    NASA operates high value critical equipment (HVCE) that requires trouble shooting, periodic maintenance and continued monitoring by Operations staff. The complexity HVCE and information required to maintain and trouble shoot HVCE to assure continued mission success as paper is voluminous. Training on new HVCE is commensurate with the need for equipment maintenance. LaRC Research Directorate has undertaken a proactive research to support Operations staff by initiation of the development and prototyping an electronic computer based portable maintenance aid (Operator's Assistant). This research established a goal with multiple objectives and a working prototype was developed. The research identified affordable solutions; constraints; demonstrated use of commercial off the shelf software; use of the US Coast Guard maintenance solution; NASA Procedure Representation Language; and the identification of computer system strategies; where these demonstrations and capabilities support the Operator, and maintenance. The results revealed validation against measures of effectiveness and overall proved a substantial training and capability sustainment tool. The research indicated that the OA could be deployed operationally at the LaRC Compressor Station with an expectation of satisfactorily results and to obtain additional lessons learned prior to deployment at other LaRC Research Directorate Facilities. The research revealed projected cost and time savings.

  20. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  1. Comparative study of operation of condensing and traditional boilers equipped with the ORC module for electricity generation

    Directory of Open Access Journals (Sweden)

    Mikielewicz Dariusz

    2017-01-01

    Full Text Available Condensing technology applied to boilers is to make full use of thermal energy contained in the fuel. That means that additionaly the heat from condensation of exhaust gases can be used for the purposes of heating the domestic hot water and to cover the demand for central heating. The study analyzed the operation of the “traditional” boiler equipped with the ORC module as the similar arrangement but with the condensing boiler. In the case of a conventional boiler there is noted a greater fuel consumption and the greater power generated than in the case of the unit with the condensing boiler. Postulated is the indicator in the form of a ratio of turbine power to the mass flow rate of fuel, which in turn gives a higher value for the condensing boiler, thus demonstrating that the operation of condensing boiler ORC module will be more economical. Perspective domestic micro CHP with ORC should be installed in boilers with recovery of heat from condensation from the exhaust gases.

  2. Tl dosimetry around equipment s for dental radiography

    International Nuclear Information System (INIS)

    Medrano, E.; Robles G, M. A.; Vega C, H. R.; Letechipia de L, C.; Hernandez D, V. M.

    2014-08-01

    The ambient dose equivalent around X-rays units used in dentistry has been measured. The radiation that escapes of the tail stock of the X-rays equipment was also measured, and the dose in the surfaces of a polyethylene spherical mannequin and other of water, used to represent the patient and the operator, respectively. The study was realized with thermoluminescent dosimeters of the type 100. The operation conditions of the X-rays units were varied when the ambient dose equivalent was measured. In the other measurements the equipment s were operated to 70 k Vp and 8 m A. In the ambient dose equivalent was found asymmetry, likewise the due dose to the radiation that escapes of one of tail stocks was also asymmetric. The dose values in the mannequins went minors to the recommended reference values. (Author)

  3. US8,994,532 "Data Center Equipment Location and Monitoring System"

    DEFF Research Database (Denmark)

    2014-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database. The software application program...

  4. Equipment for isotope diagnostics

    International Nuclear Information System (INIS)

    Platz, W.

    1976-01-01

    The invention concerns an improvement of equipment for isotope diagnostics allowing to mark special intensity ranges of the recorded measurements by means of different colors. For undisturbed operation it is of advantage to avoid electric circuits between movable and unmovable parts of the color recorder. According to the invention, long gear wheels of glass fiber-reinforced polyamide are used for these connections. (ORU) [de

  5. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  6. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  7. Design considerations, tooling, and equipment for remote in-service inspection of radioactive piping and pressure-vessel systems

    International Nuclear Information System (INIS)

    Swannack, D.L.; Schmoker, D.S.

    1983-01-01

    This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor-system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  8. Annual report on the state of RB reactor components and equipment, december 1999

    International Nuclear Information System (INIS)

    Milosevic, M.

    1999-12-01

    According to the performed analysis, it is considered that the RB reactor can be operated safely until the existing control and safety systems could be maintained in satisfactory operable state. Failures of heavy water circulation system valves which may cause decreased availability but no accident. During 1998 the reactor lattice was changed 13 times, meaning that experiments were done with 13 configurations of the reactor core. Total reactor operation amounted to 84 Wh with 40 start-ups (attained criticality levels). This report contains 4 Annexes, detailed description of the state of reactor equipment in 1999, reactor operation nd utilization data, plan for regular annual maintenance and refurbishment of reactor equipment and plan for minimum needed resources for regular maintenance of the components and equipment in the forthcoming year

  9. Annual report on the state of RB reactor components and equipment, december 1998

    International Nuclear Information System (INIS)

    Milosevic, M.

    1998-12-01

    According to the performed analysis, it is considered that the RB reactor can be operated safely until the existing control and safety systems could be maintained in satisfactory operable state. Failures of heavy water circulation system valves which may cause decreased availability but no accident. During 1998 the reactor lattice was changed 7 times, meaning that experiments were done with 7 configurations of the reactor core. Total reactor operation amounted to 177.5 Wh with 40 start-ups (attained criticality levels). This report contains 4 Annexes, detailed description of the state of reactor equipment in 1998, reactor operation nd utilization data, plan for regular annual maintenance and refurbishment of reactor equipment and plan for minimum needed resources for regular maintenance of the components and equipment in the forthcoming year

  10. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  11. Analysis of performance reliability of electrical and electronic equipment of car-tractor

    Directory of Open Access Journals (Sweden)

    Kravchenko О.Р.

    2016-08-01

    Full Text Available The analysis of the operational reliability of electrical and electronic equipment of vehicles, trucks Mercedes-Benz Actros 1844 LS and Volvo FH 1242, conducting international cargo transportation is performed. It is established that the equipment is reliable, which meets modern requirements, but where there is a violation of the resolution. The reason for repair work is constructive and operational factors. Distribution of efficiency and overall performance of operational reliability is retrieved. Items with more bounce are found. Common factors of violation of efficiency cars, trucks in operation, are largely different stages in warranty runs are obtained.

  12. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  13. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  14. Qualification of electrical equipment. A United States nuclear system supplier perspective

    International Nuclear Information System (INIS)

    Jordan, W.G.

    1978-01-01

    At Westinghouse Pressurized Water Reactor Systems Division (PWR-SD) qualification. of safety related electrical equipment can be segregated into three distinct generations: (1) the initial seismic and environmental qualification programs for electrical equipment (1969-1972); (2) the supplemental sismic and environmental qualification programs (1975-1977); and (3) the seismic and environmental qualification programs to meet IEEE-323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations''(1975). The latter two programs (in a licensing framework), as they are most current, with emphasis on electrical equipment (e.g. transmitters, rack mounted equipment) as opposed to electro-mechanical equipment (valve operators, pump motors) are reviewed. (author)

  15. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    Science.gov (United States)

    Rossel, R. E.; Fedosseev, V. N.; Marsh, B. A.; Richter, D.; Rothe, S.; Wendt, K. D. A.

    2013-12-01

    With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.

  16. Fundamentals for cost calculations of X-ray equipment

    International Nuclear Information System (INIS)

    Bossard, F.

    1985-01-01

    Economic implications of running an X-ray departement in Switzerland will be illustrated by comparing operating costs of private radiological institutes with and without CT to the operating costs of large radiological departments in hospitals with and without CT and to the operating costs of simple X-ray equipment in general practicioners' offices. - These costs calculations form the basis for cost-benefit analyses. (orig.) [de

  17. Progress in control equipment for fuel-handling machinery

    International Nuclear Information System (INIS)

    Nutting, B.A.

    1986-01-01

    The paper outlines the development of the equipment used to control the fuel-handling machinery associated with nuclear reactors, from the early electromechanical equipment, through solid-state switching logic to programmable controllers and microprocessors. The control techniques have developed along with the technology, and modern systems offer versatility, reliability and ease of design, operation and maintenance. Future trends and developments are discussed together with possible limiting factors. (author)

  18. Chapter 5. Essential equipment, pharmaceuticals and supplies. Recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza epidemic or mass disaster

    NARCIS (Netherlands)

    Sprung, Charles L.; Kesecioglu, Jozef; Christian, Michael D.; Camargo, Ruben; Ceraso, Daniel; Azoulay, Elie; Duguet, Alexandre; Guery, Benoit; Reinhart, Konrad; Adini, Bruria; Barlavie, Yaron; Benin-Goren, Odeda; Cohen, Robert; Klein, Motti; Leoniv, Yuval; Margalit, Gila; Rubinovitch, Bina; Sonnenblick, Moshe; Steinberg, Avraham; Weissman, Charles; Wolff, Donna; de Jong, Menno; Moreno, Rui; An, Youzhong; Du, Bin; Joynt, Gavin M.; Colvin, John; Loo, Shi; Richards, Guy; Artigas, Antonio; Pugin, Jerome; Amundson, Dennis; Devereaux, Asha; Beigel, John; Danis, Marion; Farmer, Chris; Hick, John L.; Maki, Dennis; Masur, Henry; Rubinson, Lewis; Sandrock, Christian; Talmor, Daniel; Truog, Robert; Zimmerman, Janice; Brett, Steve; Montgomery, Hugh; Rhodes, Andrew; Sanderson, Frances; Taylor, Bruce

    2010-01-01

    To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on essential equipment, pharmaceuticals and supplies. Based on a literature review and expert opinion, a Delphi process was

  19. Preliminary design report for prototypical spent nuclear fuel rod consolidation equipment

    International Nuclear Information System (INIS)

    Judson, B.F.; Maillet, J.; O'Neill, G.L.; Tsitsichvili, J.; Tucoulat, D.

    1986-12-01

    The purpose of the Prototypical Consolidation Demonstration Project (PCDP) is to develop and demonstrate the equipment system that will be used to consolidate the bulk of the spent nuclear fuel generated in the United States prior to its placement in a geological repository. The equipment must thus be capable of operating on a routine production basis over a long period of time with stringent requirements for safety, reliability, productivity and cost-effectiveness. Four phases are planned for the PCDP. Phase 1 is the Preliminary Design of generic consolidation equipment that could be installed at a Monitored Retrievable Storage (MRS) facility or in the Receiving ampersand Handling Facility at a geologic repository site. Phase 2 will be the Final Design and preparation of procurement packages for the equipment in a configuration capable of being installed and tested in a special enclosure within the TAN Hot Shop at DOE's Idaho National Engineering Laboratory. In Phase 3 the equipment will be fabricated and then tested with mock fuel elements in a contractor's facility. Finally, in Phase 4 the equipment will be moved to the TAN facility for demonstration operation with irradiated spent fuel elements. 55 figs., 15 tabs

  20. Operation method study based on the energy balance of an independent microgrid using solar-powered water electrolyzer and an electric heat pump

    International Nuclear Information System (INIS)

    Obara, Shin'ya; Watanabe, Seizi; Rengarajan, Balaji

    2011-01-01

    A completely energy-independent microgrid (green microgrid) was examined in this work with the aims of abating greenhouse gas emissions by spreading the use of green energy, providing energy backup systems for disaster, and increasing the energy utilization efficiency with the use of exhaust heat. This paper analyzed the energy supply to six houses in a cold region. The green microgrid consisted of photovoltaics, water electrolyzers, proton-exchange membrane fuel cells (PEFCs), and heat pumps. To investigate the operation method and the capacity of each piece of equipment in the arrangement, a distributed system with two or more sets of equipment and a central system with one set of equipment were analyzed by a genetic algorithm. By introducing the prior energy need pattern of a cold region into the proposed system, the operation method and equipment capacity based on the power and heat balance were clarified. By introducing the partial load performance of a water electrolyzer and a PEFC into the analysis program, the operation method of each system was investigated. It was found that the area of a solar cell of a distributed system could be reduced by 12% as compared to a central system. -- Highlights: → A completely energy-independent microgrid (green microgrid) was planned. → The green microgrid consisted of photovoltaics, water electrolyzers, PEM-FCs, and heat pumps. → Operation of a concentrated system and a distributed system. → Investigate of the operation method and the capacity of each piece of equipment.

  1. 30 CFR 18.91 - Electric equipment for which field approvals will be issued.

    Science.gov (United States)

    2010-07-01

    ..., by the owner-coal mine operator of such machines including any associated electrical equipment... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric equipment for which field approvals... OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT...

  2. After-hours power status of office equipment and energy use of miscellaneous plug-load equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Marageret J.; Busch, John F.

    2004-05-27

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of miscellaneous plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. For most types of miscellaneous equipment, we also estimated typical unit energy consumption in order to estimate total energy consumption of the miscellaneous devices within our sample. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from sixteen commercial buildings in California, Georgia, and Pennsylvania: four education buildings, two medical buildings, two large offices (> 500 employees each), three medium offices (50-500 employees each), and five small

  3. Designing efficient logging systems for northern hardwoods using equipment production capabilities and costs.

    Science.gov (United States)

    R.B. Gardner

    1966-01-01

    Describes a typical logging system used in the Lake and Northeastern States, discusses each step in the operation, and presents a simple method for designing and efficient logging system for such an operation. Points out that a system should always be built around the key piece of equipment, which is usually the skidder. Specific equipment types and their production...

  4. Development of diaphragm automatic homing equipment

    International Nuclear Information System (INIS)

    Kobayashi, Hidetoshi; Yamada, Koji; Moriya, Shinichi; Koike, Jiro; Okabe, Masao; Oyama, Akihiro.

    1996-01-01

    In steam-turbine overhaul inspection, one of the most important processes is to remove rust and deposited contaminants on the surface of turbine parts, while the turbine is in operation, to recover thermal efficiency and prepare good surface conditions for color penetrant inspection. These processes generally are done by dry honing, but this generates dust. To protect laborers against these conditions, Hitachi, Ltd. has developed automatic honing equipment for the diaphragms of the nuclear steam turbine. This equipment was first used in the first annual inspection and overhaul of Hamaoka Nuclear Power Plant No.4 of Chubu Electric Power Inc. (author)

  5. Investigation of material efficient fin patterns for cost-effective operation of fin and tube heat exchanger

    DEFF Research Database (Denmark)

    Singh, Shobhana; Sørensen, Kim; Condra, Thomas Joseph

    2017-01-01

    Design management of a thermal energy system is a critical part of identifying basic designs that meet large scale user demand under certain operating characteristics. Fin and tube heat exchangers are among the most commonly used thermal energy systems which are generating considerable interest...... and tube heat exchanger. Computational fluid dynamic models of fin and tube heat exchanger with different fin patterns are developed to investigate the fin pattern behavior on heat transfer and pressure loss performance data. In addition, the numerical results are utilized to analyze the engineering design...... scale-up heat exchanger configurations with each fin pattern focusing on the application of chosen fin and tube heat exchanger in marine exhaust gas boiler. The analysis highlights the impact of material efficient fin patterns investigated and predicts that the polynomial and sinusoidal fin patterns...

  6. Maintaining radiation exposures as low as reasonably achievable (ALARA) for dental personnel operating portable hand-held x-ray equipment.

    Science.gov (United States)

    McGiff, Thomas J; Danforth, Robert A; Herschaft, Edward E

    2012-08-01

    Clinical experience indicates that newly available portable hand-held x-ray units provide advantages compared to traditional fixed properly installed and operated x-ray units in dental radiography. However, concern that hand-held x-ray units produce higher operator doses than fixed x-ray units has caused regulatory agencies to mandate requirements for use of hand-held units that go beyond those recommended by the manufacturer and can discourage the use of this technology. To assess the need for additional requirements, a hand-held x-ray unit and a pair of manikins were used to measure the dose to a simulated operator under two conditions: exposures made according to the manufacturer's recommendations and exposures made according to manufacturer's recommendation except for the removal of the x-ray unit's protective backscatter shield. Dose to the simulated operator was determined using an array of personal dosimeters and a pair of pressurized ion chambers. The results indicate that the dose to an operator of this equipment will be less than 0.6 mSv y⁻¹ if the device is used according to the manufacturer's recommendations. This suggests that doses to properly trained operators of well-designed, hand-held dental x-ray units will be below 1.0 mSv y⁻¹ (2% of the annual occupational dose limit) even if additional no additional operational requirements are established by regulatory agencies. This level of annual dose is similar to those reported as typical dental personnel using fixed x-ray units and appears to satisfy the ALARA principal for this class of occupational exposures.

  7. Prophylactic and thermovision measurements of electric machines and equipment

    Energy Technology Data Exchange (ETDEWEB)

    Jedlicka, R; Brestovansky, L [Atomova Elektraren Bohunice, Jaslovske Bohunice (Slovakia)

    1997-12-31

    High-voltage measurements of generators, unit and service transformers and some significant motor drives used at a nuclear power plant are described in this paper. Thermovision measurements of electric machines and distribution systems are dealt with in the second part of the paper. Power electric equipment represent one of the most significant components of a nuclear power plant. Turbine mechanical energy is converted into the electrical energy within these equipment. Power generated by generators is transformed by transformers so that it can achieve appropriate parameters for both the transmission over the distribution system and the power plant service power supply. The service power supply switchboards and cables provide supply to motors and other consumers necessary for the nuclear power plant technological process. The whole complex of equipment has to be maintained in good technical conditions. It is necessary to make thermovision and prophylactic measurements to identify and verify the electric equipment technical condition. The mentioned measurements warn the operation staff in advance against both gradual deterioration of power connection contact resistances, i.e. power connections overheating, and the machine insulation systems condition deterioration. The operation staff try to prevent the electric equipment operation accidents by early removing the detected failures, thus, improving the nuclear safety. In order to provide the above-mentioned activities a special prophylactic measurement group was established at the NPP Bohunice in 1983. The group specialists make following types of measurements. 1. Prophylactic measurements of electric machines. Prophylactics of 220 MW generators and 6 MW service power generators; Prophylactics of both unit and service transformers and VHV bushings; Prophylactics of major 6 kV motor drives. 2. Thermovision measurements of current connections. (Abstract Truncated)

  8. 49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Computers and data processing equipment (account XX-27-46). 1242.46 Section 1242.46 Transportation Other Regulations Relating to Transportation... RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46...

  9. 49 CFR 1242.45 - Passenger and other revenue equipment (account XX-27-45).

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Passenger and other revenue equipment (account XX-27-45). 1242.45 Section 1242.45 Transportation Other Regulations Relating to Transportation... RAILROADS 1 Operating Expenses-Equipment § 1242.45 Passenger and other revenue equipment (account XX-27-45...

  10. Data-Driven Scenario Generation for Enhanced Realism of Equipment Training Simulators

    NARCIS (Netherlands)

    Vahdatikhaki, Faridaddin; Hammad, Amin; olde Scholtenhuis, Léon Luc; Miller, Seirgei Rosario; Makarov, Denis

    2017-01-01

    Improving the training of heavy equipment operators can make a significant contribution to improving the safety of construction sites. In recent years, Virtual Reality (VR)-based simulators have gained increased popularity for the use in equipment training programs. While VR training simulators for

  11. Overview of statistical methods, models and analysis for predicting equipment end of life

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    Utility equipment can be operated and maintained for many years following installation. However, as the equipment ages, utility operators must decide whether to extend the service life or replace the equipment. Condition assessment modelling is used by many utilities to determine the condition of equipment and to prioritize the maintenance or repair. Several factors are weighted and combined in assessment modelling, which gives a single index number to rate the equipment. There is speculation that this index alone may not be adequate for a business case to rework or replace an asset because it only ranks an asset into a particular category. For that reason, a new methodology was developed to determine the economic end of life of an asset. This paper described the different statistical methods available and their use in determining the remaining service life of electrical equipment. A newly developed Excel-based demonstration computer tool is also an integral part of the deliverables of this project.

  12. Development of processes and equipment for the refabrication of HTGR fuels

    International Nuclear Information System (INIS)

    Sease, J.D.; Lotts, A.L.

    1976-06-01

    Refabrication is in the step in the HTGR thorium fuel cycle that begins with a nitrate solution containing 238 U and culminates in the assembly of this material into fuel elements for use in an HTGR. Refabrication of HTGR fuel is essentially a manufacturing operation and consists of preparation of fuel kernels, application of multiple layers of pyrolytic carbon and SiC, preparation of fuel rods, and assembly of fuel rods in fuel elements. All the equipment for refabrication of 238 U-containing fuel must be designed for completely remote operation and maintenance in hot cell facilities. This paper describes the status of processes and equipment development for the remote refabrication of HTGR fuels. The feasibility of HTGR refabrication processes has been proven by laboratory development. Engineering-scale development is now being performed on a unit basis on the majority of the major equipment items. Engineering-scale equipment described includes full-scale resin loading equipment, a 5-in.-dia (0.13-m) microsphere coating furnace, a fuel rod forming machine, and a cure-in-place furnace

  13. Psychological biases affecting human cognitive performance in dynamic operational environments

    International Nuclear Information System (INIS)

    Takano, Kenichi; Reason, J.

    1999-01-01

    In order to identify cognitive error mechanisms observed in the dynamic operational environment, the following materials were analyzed giving special attention to psychological biases, together with possible cognitive tasks and these location, and internal and external performance shaping factors: (a) 13 human factors analyses of US nuclear power plant accidents, (b) 14 cases of Japanese nuclear power plant incidents, and (c) 23 cases collected in simulator experiments. In the resulting analysis, the most frequently identified cognitive process associated with error productions was situation assessment, and following varieties were KB processes and response planning, all of that were the higher cognitive activities. Over 70% of human error cases, psychological bias was affecting to cognitive errors, especially those to higher cognitive activities. In addition, several error occurrence patterns, including relations between cognitive process, biases, and PSFs were identified by the multivariate analysis. According to the identified error patterns, functions that an operator support system have to equip were discussed and specified for design base considerations. (author)

  14. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  15. [Fundamental aspects for accrediting medical equipment calibration laboratories in Colombia].

    Science.gov (United States)

    Llamosa-Rincón, Luis E; López-Isaza, Giovanni A; Villarreal-Castro, Milton F

    2010-02-01

    Analysing the fundamental methodological aspects which should be considered when drawing up calibration procedure for electro-medical equipment, thereby permitting international standard-based accreditation of electro-medical metrology laboratories in Colombia. NTC-ISO-IEC 17025:2005 and GTC-51-based procedures for calibrating electro-medical equipment were implemented and then used as patterns. The mathematical model for determining the estimated uncertainty value when calibrating electro-medical equipment for accreditation by the Electrical Variable Metrology Laboratory's Electro-medical Equipment Calibration Area accredited in compliance with Superintendence of Industry and Commerce Resolution 25771 May 26th 2009 consists of two equations depending on the case; they are: E = (Ai + sigmaAi) - (Ar + sigmaAr + deltaAr1) and E = (Ai + sigmaAi) - (Ar + sigmaA + deltaAr1). The mathematical modelling implemented for measuring uncertainty in the Universidad Tecnológica de Pereira's Electrical Variable Metrology Laboratory (Electro-medical Equipment Calibration Area) will become a good guide for calibration initiated in other laboratories in Colombia and Latin-America.

  16. An investigation of hydrogen storage methods for fuel cell operation with man-portable equipment

    Energy Technology Data Exchange (ETDEWEB)

    Browning, D [Defence Evaluation and Research Agency, Haslar (United Kingdom); Jones, P [Defence Evaluation and Research Agency, Haslar (United Kingdom); Packer, K [Defence Evaluation and Research Agency, Haslar (United Kingdom)

    1997-03-01

    Air breathing proton exchange membrane fuel cells (PEMFC) are being considered as a power source for man-portable equipment, such as army radios. In addition to the weight and volume of the fuel cell itself, the device producing hydrogen with which to fuel the cell is also of crucial importance. This paper describes a number of hydrogen storage methods and discusses their applicability to man-portable equipment. (orig.)

  17. Using Patterns for Multivariate Monitoring and Feedback Control of Linear Accelerator Performance: Proof-of-Concept Research

    International Nuclear Information System (INIS)

    Cordes, Gail Adele; Van Ausdeln, Leo Anthony; Velasquez, Maria Elena

    2002-01-01

    The report discusses preliminary proof-of-concept research for using the Advanced Data Validation and Verification System (ADVVS), a new INEEL software package, to add validation and verification and multivariate feedback control to the operation of non-destructive analysis (NDA) equipment. The software is based on human cognition, the recognition of patterns and changes in patterns in time-related data. The first project applied ADVVS to monitor operations of a selectable energy linear electron accelerator, and showed how the software recognizes in real time any deviations from the optimal tune of the machine. The second project extended the software method to provide model-based multivariate feedback control for the same linear electron accelerator. The projects successfully demonstrated proof-of-concept for the applications and focused attention on the common application of intelligent information processing techniques

  18. Dynamic of the morphologic and functional X-ray patterns following operation for pylorus consolidation

    International Nuclear Information System (INIS)

    Radev, D.; Ganchev, D.; Nakov, D.; Demirov, D.; Najdenov, N.

    1990-01-01

    Results are reported of X-ray study of 24 patients operated for pyloric insufficiency and reflux-gastritis. The operative technique was one of consolidation of the pylorus by circular invagination of the pyloric ring with formation of a valvular mechanism with two transversal folds. The X-ray pattern and the function of the consolidated pylorus were close to the normal. For a period of 7 years the effect was lasting; despite the combination with ligamentotomy, however, the duodenal stasis and the duodeno-gastric reflux were insufficiently affected. 2 figs., 14 refs

  19. National Synchrotron Light Source guidelines for the conduct of operations

    International Nuclear Information System (INIS)

    Fewell, N.

    1990-03-01

    This report briefly discusses the following topics: NSLS operations organization and administration; shift routines and operating practices; NSLS control room activities; communications; control of on-shift training; investigation of abnormal events; notifications; control of equipment and system status; lock-out tagout; independent verification; logkeeping; shift turnover; required reading; shift orders; equipment operations guides; operator aid postings; and equipment labeling

  20. 42 CFR 410.38 - Durable medical equipment: Scope and conditions.

    Science.gov (United States)

    2010-10-01

    ... or purchase of durable medical equipment, including iron lungs, oxygen tents, hospital beds, and wheelchairs, if the equipment is used in the patient's home or in an institution that is used as a home. (b... vehicle whose steering is operated by an electronic device or a joystick to control direction and turning...

  1. Quality control of repair of equipment for coal preparation plants. Upravlenie kachestvom remonta oborudovaniya ugleobogatitel'nykh fabrik

    Energy Technology Data Exchange (ETDEWEB)

    Okonishnikov, A I; Neskoromnykh, V M; Surzhenko, V S; Sirichenko, R P; Pavlyuchenko, S G; Lesikov, A V

    1984-01-01

    The Ukrniiugleobogashchenie, Kalininsk and Sukhodol'sk coal preparation plants have developed the SUKRO system for control of repair quality of coal preparation equipment in the USSR. The system is based on a system of standards used in coal preparation plants. The following systems of standards used by the SUKRO system are analyzed: organization standards (order of repair in a coal preparation plant, repair planning, spare part systems, methods for determining equipment wear, analysis of equipment failures), standards for maintenance and repair (methods for equipment maintenance, service life of each equipment component or system, structure of preventive repair or repair, organizational models of repair operations, lubrication systems), standards for assessment of labor quality during repair operations. Use of the SUKRO system in the Sukhodol'sk coal preparation plant is evaluated. The SUKRO forms a system of standards for repair and maintenance of equipment considering operation conditions in coal preparation plants, requirements for equipment reliability and service life. (4 refs.)

  2. Research on the organization of equipment of nuclear emergency

    International Nuclear Information System (INIS)

    Li Xiaoming; Yang Jun

    2012-01-01

    The emergency rescue operation on major accident of nuclear facilities contains four kinds of abilities that are command and control, radiation protection, radiation monitoring and radioactive decontamination, so it needs to organize some equipment of nuclear emergency to enhance the efficiency of nuclear emergency operation. The organization of equipment of nuclear emergency should accord to the reality of the development in our country. It should have extractive structure, brief variety and advance capability, and also should be convenient, useful and adequate. The method of organization can first accord to the organization of group and organize the facilities accord to the organization of group of the emergency rescue force. (authors)

  3. Overview of Mobile Equipment Used in Case of Beyond Design Basis Accident at NPP Krsko

    International Nuclear Information System (INIS)

    Lukacevic, H.; Kopinc, D.; Ivanjko, M.

    2016-01-01

    Terrorist attack in USA in the September 11, 2001 and accident at the Fukushima - Daiichi Nuclear Power Station in the March 11, 2011 highlight the importance of mitigating strategies in responding to Beyond Design Basis Accident (BDBA), while ensuring cooling of reactor core, containment and spent fuel pool. Nuclear Power Plant Krsko (NEK) has acquired additional mobile equipment and made necessary modifications on existing systems for the connection of this equipment (fast couplers). Usage of mobile equipment is not only limited to design basis accident (DBA), but, also to prevent and mitigate the consequences in case of BDBA, when other plant systems are not available. NEK also decided to take steps for upgrade of safety measures and prepared Safety Upgrade Program (SUP), which is consistent with the nuclear industry response to the Fukushima accident and is implementing main projects and modifications related to SUP. NEK mobile equipment is not required to operate under normal reactor plant operation except for periodic surveillance testing and is incorporated into the normal training process. Equipment is dislocated from the reactor building and most of the equipment is located in the new building, able to withstand extreme natural events, including earthquakes and tornadoes. The usage of all mobile equipment is prescribed as an additional option in NEK operating procedures in following cases and enables following options: filling various tanks, filling the steam generators, filling the containment, additional compressed air source, spent fuel pool refilling and spraying, alternative power supply. This document provides an overview of NEK mobile equipment, which consists of various mobile fire protection pumps, air compressors, protective equipment, fire trucks, diesel generators. Sufficient fuel supply for the equipment is provided on site for a minimum three days of operation. (author).

  4. Methods and equipments used in power reactors

    International Nuclear Information System (INIS)

    Beraha, R.; Delevallee, A.

    1976-01-01

    The various reactor γ fuel scanning facilities presently operating around the world are reviewed. Both equipments proposed by FRAMATOME are described: one is intended for scanning removable fuel pencils, and the other one for fuel assembly scanning [fr

  5. Equipment for oral surgery in small animals.

    Science.gov (United States)

    Reiter, Alexander M

    2013-05-01

    This article provides an overview of equipment used for oral surgery. Specific instruments and materials used when performing relevant operative procedures are also mentioned in other articles in this issue. Copyright © 2013 Elsevier Inc. All rights reserved.

  6. Special equipment for processing can-rupture measurements; Equipement specialise de traitement des mesures de rupture de gaines

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, J.; Phalippou, J.; Dumont, D.; Viellard, R. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    Recent installations for detecting can-rupture in nuclear reactors use, in the measurement processing section, a digital computer, either completely or partially. The reliability of the system is limited by that of the computer, which represents a common point for the processing of data from the detector. In order to satisfy the demands imposed by safety considerations for the operation of the equipment it is necessary to consider the possibility of installing a second computer in certain cases. The use of a computer involves the presence as interface between the detection equipment and the computer itself, of sealers operating as integrators for the pulses produced by the detector. By adding a certain number of circuits to these sealers, it is possible to carry out the work now demanded of the computer, as far as the calculation is concerned. This reasoning has led us to a so-called 'decentralized' solution involving the construction of specialized equipment in the region of the prospector itself. We believe that this solution, apart from the reliability point of view, has definite economic advantages. In our solution, the common point in the processing of the data is now situated not in the zone of the production of results but further down, in the printing out of these results. Even in the case of an incident at the common point, the results are produced, exposed and compared to the alarm thresholds. In the case of a breakdown of the specialized equipment, the results from this prospector are no longer available but the others continue to operate. It seems that this solution is more reliable than that employing universal computers. By using an interchangeable drawer system (MULTIBLOC) it is possible to replace rapidly any of the specialized equipment which breaks down. The systematic use of integrated circuits (TTL) ensures an increased reliability of the equipment. (author) [French] Les installations recentes de detection de rupture de gaines

  7. A Study on Performance and Safety Tests of Electrosurgical Equipment.

    Science.gov (United States)

    Tavakoli Golpaygani, A; Movahedi, M M; Reza, M

    2016-09-01

    Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient's safety and management of the risks associated with the use of high and low frequency electrical currents on human body. The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public) was evaluated in one of the provinces of Iran according to international and national standards. The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  8. Application of Human-Autonomy Teaming (HAT) Patterns to Reduced Crew Operations (RCO)

    Science.gov (United States)

    Shively, R. Jay; Brandt, Summer L.; Lachter, Joel; Matessa, Mike; Sadler, Garrett; Battiste, Henri

    2016-01-01

    As part of the Air Force - NASA Bi-Annual Research Council Meeting, slides will be presented on recent Reduced Crew Operations (RCO) work. Unmanned aerial systems, robotics, advanced cockpits, and air traffic management are all examples of domains that are seeing dramatic increases in automation. While automation may take on some tasks previously performed by humans, humans will still be required, for the foreseeable future, to remain in the system. The collaboration with humans and these increasingly autonomous systems will begin to resemble cooperation between teammates, rather than simple task allocation. It is critical to understand this human-autonomy teaming (HAT) to optimize these systems in the future. One methodology to understand HAT is by identifying recurring patterns of HAT that have similar characteristics and solutions. A methodology for identifying HAT patterns to an advanced cockpit project is discussed.

  9. Analysis of Medical Equipment Management in Relation to the Mandatory Medical Equipment Safety Manager (MESM in Japan

    Directory of Open Access Journals (Sweden)

    Kai Ishida

    2014-01-01

    Full Text Available Half a decade has passed since the fifth revision of the medical law and mandatory appointment of a medical equipment safety manager (MESM in hospitals in Japan. During this period, circumstances have changed regarding maintenance of medical equipment (ME. We conducted a survey to examine these changes and the current situation in ME management. Maintenance of ME and related work were found to have increased in many hospitals, but the number of clinical engineering technologists (CETs has only slightly increased. The appointed MESM was a CET or physician in most hospitals. In hospitals where physicians were appointed as the MESM, 81% had operation managers. Many respondents commented that it was difficult for one person to cover all the tasks required by the MESM, due to a lack of knowledge, too much work, or other reasons. This suggests the importance of an operation manager for ME to work under the MESM.

  10. Trends of HVDC technology - highly reliable converting equipment

    International Nuclear Information System (INIS)

    Muraoka, Yasuo; Kato, Yasushi; Watanabe, Atsumi; Kano, Takashi; Kawai, Tadao

    1983-01-01

    At present, the DC power transmission in Japan is practically used for the system connection of relatively small capacity, and the reliability of AC-DC converting system has been proven to exceed the world level by the operational results. However, when the application of this system to trunk power transmission of large capacity in future is considered, it is desirable to raise the reliability of converting equipment further and to develop the stabilized control techniques in harmony with connected AC system. Hitachi Ltd. has developed diversified system-related technologies centering around DC power transmission and the techniques for raising the reliability of converting equipment tending to large capacity. In this report, the results and the future prospect are described. The recent trend of DC power transmission, the development of DC power transmission technology such as the simulation analysis, the stable operation of a DC system connected to a weak AC system and the DC independent transmission from nuclear power stations, the technical development of light direct ignition thyristor bulbs and control protection equipment are reported. (Kako, I.)

  11. An Iterative Load Disaggregation Approach Based on Appliance Consumption Pattern

    Directory of Open Access Journals (Sweden)

    Huijuan Wang

    2018-04-01

    Full Text Available Non-intrusive load monitoring (NILM, monitoring single-appliance consumption level by decomposing the aggregated energy consumption, is a novel and economic technology that is beneficial to energy utilities and energy demand management strategies development. Hardware costs of high-frequency sampling and algorithm’s computational complexity hampered NILM large-scale application. However, low sampling data shows poor performance in event detection when multiple appliances are simultaneously turned on. In this paper, we contribute an iterative disaggregation approach that is based on appliance consumption pattern (ILDACP. Our approach combined Fuzzy C-means clustering algorithm, which provide an initial appliance operating status, and sub-sequence searching Dynamic Time Warping, which retrieves single energy consumption based on the typical power consumption pattern. Results show that the proposed approach is effective to accurately disaggregate power consumption, and is suitable for the situation where different appliances are simultaneously operated. Also, the approach has lower computational complexity than Hidden Markov Model method and it is easy to implement in the household without installing special equipment.

  12. Quality assurance grading of conventional equipment at nuclear power station

    International Nuclear Information System (INIS)

    Li Ping; Li Shichang

    2006-01-01

    Equipment QA grading with the systematic and standardized approach will benefit the concerned organizations by effective allocating of limited resources to guarantee the quality of essential equipment. This paper presents a new quality assurance grading system for the convention systems/equipment of nuclear power station, which is operative and at the same time could help the owner to allot resource reasonably through the analysis of the purpose of grading and the experience and lessons of LINGAO Phase I project. (authors)

  13. Seismic verification of nuclear plant equipment anchorage

    International Nuclear Information System (INIS)

    Lepiece, M.; Van Vyve, J.

    1991-01-01

    More than 60% of the electrical power of Belgium is generated by seven PWR nuclear power plants. For three of them, the electro-mechanical equipment had to be reassessed after ten years of operation, because the seismic requirements were upgraded from 0.1 g to 0.17 g free field ground acceleration. The seismic requalification of the active equipment was a critical problem as the classical methods were too conservative. The approach based on the use of the past experience on the seismic behavior of nonnuclear equipment, chosen and developed by the SQUG, had to be transposed to the Belgian N.P.P. The decision of the accept-ability of equipment relies heavily on the aseismatic capacity of anchorage. The Electrical Power Research Institute (EPRI) developed the procedure and guideline for the demonstration of the aseismatic adequacy of equipment anchorage in a cost-effective and consistent manner, to support the decision by Seismic Review Team. The field inspection procedure to identify the type of fasteners and detect their possible defects and the verification procedure developed to calculate the aseismatic capacity of equipment anchorage on the strength of fasteners, the aseismatic capacity of anchorage and the comparison of the capacity with the demand are reported. (K.I.)

  14. Thermal fatigue equipment to test joints of materials for high heat flux components

    International Nuclear Information System (INIS)

    Visca, E.; Libera, S.; Orsini, A.; Riccardi, B.; Sacchetti, M.

    2000-01-01

    The activity, carried out in the framework of an ITER divertor task, was aimed at defining a suitable method in order to qualify junctions between armour materials and heat sink of plasma-facing components (PFCs) mock-ups. An equipment able to perform thermal fatigue testing by electrical heating and active water-cooling was constructed and a standard for the sample was defined. In this equipment, during operation cycles, two samples are heated by thermal contact up to a relevant temperature value (350 deg. C) and then the water flow is switched on, thus producing fast cooling with time constants and gradients close to the real operating conditions. The equipment works with a test cycle of about 60 s and is suitable for continuous operation. A complete test consists of about 10000 cycles. After the assembling, the equipment and the control software were optimized to obtain a good reliability. Preliminary tests on mock-ups with flat CFC tiles joined to copper heat sink were performed. Finite-elements calculations were carried out in order to estimate the value of the thermal stresses arising close to the joint under the transient conditions that are characteristic of this equipment

  15. Design, manufacture and installation of measuring and control equipments for the advanced thermal prototype reactor 'Fugen'

    International Nuclear Information System (INIS)

    Hirota, Shigeo; Kawabata, Yoshinori

    1979-01-01

    The advanced thermal prototype reactor ''Fugen'' attained the criticality on March 20, 1978, and 100% output operation on November 13, 1978. On March 20, 1979, it passed the final inspection, and since then, it has continued the smooth operation up to now. The measuring and control equipments are provided for grasping the operational conditions of the plant and operating it safely and efficiently. At the time of designing, manufacturing and installing the measuring and control equipments for Fugen, it was required to clarify the requirements of the plant design, to secure the sufficient functions, and to improve the operational process, maintainability and the reliability and accuracy of the equipments. Many design guidelines and criteria were decided in order to coordinate the conditions among five manufacturers and give the unified state as one plant. The outline of the instrumentations for neutrons, radiation monitoring and process data, the control systems for reactivity, reactor output, pressure and water supply, the safety protection system, and the process computer are described. Finally, the installations and tests of the measuring and control equipments are explained. The aseismatic capability of the equipments was confirmed. (Kako, I.)

  16. 49 CFR 1242.48 - Work and other non-revenue equipment (account XX-27-47).

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Work and other non-revenue equipment (account XX... RAILROADS 1 Operating Expenses-Equipment § 1242.48 Work and other non-revenue equipment (account XX-27-47...—other (account XX-19-06). ...

  17. 47 CFR 68.110 - Compatibility of the public switched telephone network and terminal equipment.

    Science.gov (United States)

    2010-10-01

    ... changes in its communications facilities, equipment, operations or procedures, where such action is... in this part. If such changes can be reasonably expected to render any customer's terminal equipment... network and terminal equipment. 68.110 Section 68.110 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  18. Experience in industrial radiography equipment into carry out inspections in Brazil

    International Nuclear Information System (INIS)

    Lopes, Valdir Maciel; Silva, Joao

    2008-01-01

    The Nuclear and Energy Research Institute (IPEN), in accordance with the attributions given by the National Commission of Nuclear Energy (CNEN), has been supplying the market with radioactive sealed sources of Iridium 192 ( 192 Ir), for Brazil and some South America Countries, for more than 24 years. In this period, the experience acquired in the accompanied of the technological improvement in the industrial gammagraphy equipment; into Sealed Sources Production Laboratory (LPFS) will be show. Of the set of operations carry out in the LPFS, since the assemblies, tests of qualification of the sources also inspection at of the equipment for posterior applications in field, it is intended to demonstrate to the technological improvement associate to the radiological and operational security. In this work, the data base of the system of the LPFS will be used, as well as the professional experience of the laboratory team in the daily relationship with the companies responsible for the equipment operation. (author)

  19. Pattern recognition in high energy physics

    International Nuclear Information System (INIS)

    Tenner, A.G.

    1980-01-01

    In high energy physics experiments tracks of elementary particles are recorded by different types of equipment. Coordinates of points of these tracks have to be measured for the geometrical reconstruction and the further analysis of the observed events. Pattern recognition methods may facilitate the detection of tracks or whole events and the separation of relevant from non-relevant information. They may also serve for the automation of measurement. Generally, all work is done by digital computation. In a bubble chamber tracks appear as strings of vapour bubbles that can be recorded photographically. Two methods of pattern recognition are discussed. The flying spot digitizer encodes the pattern on the photograph into point coordinates in the memory of a computer. The computer carries out the pattern recognition procedure entirely on the basis of the stored information. Cathode ray instruments scan the photograph by means of a computer steered optical device. Data acquisition from the film is performed in a feedback loop of the computation. In electronic experimental equipment tracks are defined by the spacial distribution of hits of counters (wire counters, scintillation counters, spark chambers). Pattern recognition is generally performed in various stages both by on-line and off-line equipment. Problems in the data handling arise both from the great abundance of data and from the time limits imposed on the on-line computation by high measuring rates. The on-line computation is carried out by hardwired logic, small computers, and to an increasing extent by microprocessors. (Auth.)

  20. Regulatory aspects of the enforcement policy applied to teletherapy equipment obsolescence (1995-2002)

    International Nuclear Information System (INIS)

    Truppa, Walter A.; Rey, Hugo L.; Rojas, Carlos A.

    2004-01-01

    The paper describes the way in which the Nuclear Regulatory Authority (ARN) has implemented an 'enforcement' policy for the services of radiotherapy that operated obsolete cobalt therapy units. Without doubt one of the greater advances has been the simulation and planning of the treatment, indispensable tools in a system of quality in radiotherapy where the equipment acquires a preponderant paper. In Argentina the distribution of equipment was inhomogeneous, and within it coexisted, as primary and unique units, great amount with a technology today already obsolete. The Nuclear Regulatory Authority (ARN) took a strong regulatory attitude directed to change or to retire many of the units, as its characteristics of design and antiquity did not fulfill the criteria of radiological security established in the norms (optimization of the dose, distances source to skin, yield in surface, adequate maintenance, etc.). On this matter a policy was applied to impose within suitable terms, the change of the obsolete equipment for this practice, particularly those distances source to skin minor than 80 cm. As result of the applied coercive measures at this moment, 28 equipment of cobalt therapy in advanced degree of obsolescence were retired by regulatory decision. Part of these equipment were replaced by their owners by more modern equipment whose operation adjusts to the requirements of the radiological security norm, whereas the majority was replaced by linear accelerators. At the moment there are 86 of cobalt therapy units and 52 accelerators operating in our country, against 104 and 32 respectively, that operated in 1995. (author)

  1. Risk assessment of the upstream petroleum industry's oil spill response equipment capability in western Canada

    International Nuclear Information System (INIS)

    Wotherspoon, P.; Brown, L.; Sawyer, M.

    1993-01-01

    A key component in the development of an effective onshore oil spill response capability is the type, condition, and geographical placement of oil spill equipment. When spill response equipment is first being purchased for a particular operating area, a brief analysis should be conducted to ensure that the equipment would provide an adequate response capability for that area. This response capability may change over time with variations in oil field production capabilities, pipelines and markets, company ownerships, manpower availability, and other logistical changes. Equipment may also become inoperable or redundant. These problems may be effectively addressed if one operator or spill cooperative actively reviews their spill response capabilities on a regular (annual) basis. However, when multiple operators and cooperatives exist over an extensive geographical area, the responsibility for regularly review of the capabilities of spill equipment may become lost in the organizational structure and in other responsibilities. In addition, the responsibility to conduct a multiarea review of the surrounding area may never be identified

  2. New networks of technological creation in energy industries: reassessment of the roles of equipment suppliers and operators

    Energy Technology Data Exchange (ETDEWEB)

    Jacquier-Roux, V. [Institut de Recherche Economique sur la Production et le Developpement -IREPD, Universite Pierre Mendes-France, 38 - Grenoble (France); Bourgeois, B. [Institut d' Economie et de Politique de l' Energie - IEPE-CNRS/ Universite Pierre Mendes-France, 38 - Grenoble (France)

    2002-12-01

    Within a financial context of selection inducing either a decrease or a drop of their home research and development expenditures, energy industries companies have succeeded to maintain and even to increase their knowledge production during the last 15 years (1985 - 1998). To understand these apparently paradoxical changes, elements of analysis are looked for within an evolutionary framework, and more specially referring to the related developments to network-firms, user-supplier relationship, and interactive nature of innovation processes. Empirical data are set on granted patents to a sample of the top 15 world largest companies on both sides of operators and equipment suppliers, and for the two industries of oil production and power generation. Interpretation of the results suggests that two dynamics ought to be distinguished. On one side, dynamics of the networks of technological creation is characterized by an upstream going-up of the head of the network towards suppliers. On the other side networks of creation of competitive advantages and bargaining power continues to be based on the operators and their strategies of adaptation to the constraints and opportunities of their institutional, financial and competitive environment. (author)

  3. Reliability and maintainability data acquisition in equipment development tests

    International Nuclear Information System (INIS)

    Haire, M.J.; Gift, E.H.

    1983-10-01

    The need for collection of reliability, maintainability, and availability data adds a new dimension to the data acquisition requirements of equipment development tests. This report describes the reliability and maintainability data that are considered necessary to ensure that sufficient and high quality data exist for a comprehensive, quantitative evaluation of equipment and system availability. These necessary data are presented as a set of data collection forms. Three data acquisition forms are discussed: an inventory and technical data form, which is filed by the design engineer when the design is finished or the equipment is received; an event report form, which is completed by the senior test operator at each shutdown; and a maintainability report, which is a collaborative effort between senior operators and lead engineers and is completed on restart. In addition, elements of a reliability, maintainability evaluation program are described. Emphasis is placed on the role of data, its storage, and use in such a program

  4. Fuel Handling Equipment Maintenance for Critical Path Time Savings

    Energy Technology Data Exchange (ETDEWEB)

    Saville, M.; Williams, A.

    2015-07-01

    By sharing lessons learned and operating experience gained by AREVA Stearns RogerTM Services from more than 45 years of servicing, maintaining, and upgrading Fuel Handling Equipment (FHE) and as the original equipment manufacturer to 56% of domestic U.S. FHE (PWR and BWR) as well as 19 units overseas, this paper presents trends and market forces that have led to the neglect of FHE, the risks of not adequately maintaining FHE, and the financial benefits of proactively maintaining FHE. The benefit to audiences is to come to a better understanding of how critical path delays can be avoided and thus reduce nuclear power plant operating costs. Note that statistics and monetary values given herein are based on recent typical experiences of AREVA Stearns RogerTM Services. Examples discussed are based on actual lessons learned. For the purposes of this paper, upgrades are considered a part of equipment maintenance unless specifically discussed separately. (Author)

  5. Specialized computer system to diagnose critical lined equipment

    Science.gov (United States)

    Yemelyanov, V. A.; Yemelyanova, N. Y.; Morozova, O. A.; Nedelkin, A. A.

    2018-05-01

    The paper presents data on the problem of diagnosing the lining condition at the iron and steel works. The authors propose and describe the structure of the specialized computer system to diagnose critical lined equipment. The relative results of diagnosing lining condition by the basic system and the proposed specialized computer system are presented. To automate evaluation of lining condition and support in making decisions regarding the operation mode of the lined equipment, the specialized software has been developed.

  6. 7 CFR 1436.6 - Eligible storage or handling equipment.

    Science.gov (United States)

    2010-01-01

    ...) Electrical equipment, including labor and materials for installation, such as lighting, motors, and wiring... installation, such as lighting, motors, and wiring integral to the proper operation of the sugar storage and... materials for installation, such as lighting, motors, and wiring integral to the proper operation of a cold...

  7. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  8. Small Aircraft Transportation System, Higher Volume Operations Concept: Normal Operations

    Science.gov (United States)

    Abbott, Terence S.; Jones, Kenneth M.; Consiglio, Maria C.; Williams, Daniel M.; Adams, Catherine A.

    2004-01-01

    This document defines the Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) concept for normal conditions. In this concept, a block of airspace would be established around designated non-towered, non-radar airports during periods of poor weather. Within this new airspace, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Using onboard equipment and procedures, they would then approach and land at the airport. Departures would be handled in a similar fashion. The details for this operational concept are provided in this document.

  9. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  10. Developing ''SMART'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; SpencerR, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of: (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased finding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the ''Smart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations''. This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABB CENP), Sandia National Laboratories, Duke Engineering and Services (DE and S), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of smart equipment and predictive maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the Smart Equipment program will: (1) Identify and prioritize nuclear plant equipment that would most likely benefit from adding smart features; (2) Develop a methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i.e. smart equipment); (3) Develop a methodology to provide plant operators with real-time information through smart equipment Man-Machine Interfaces (MMI) to support their decision making; (4) Demonstrate the methodology on a targeted component and/or system; (5) Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed subtask

  11. The spectral density of the QCD Dirac operator and patterns of chiral symmetry breaking

    International Nuclear Information System (INIS)

    Toublan, D.; Verbaarschot, J.J.M.

    1999-01-01

    We study the spectrum of the QCD Dirac operator for two colors with fermions in the fundamental representation and for two or more colors with adjoint fermions. For N f flavors, the chiral flavor symmetry of these theories is spontaneously broken according to SU (2N f → Sp (2N f ) and SU (N f → O (N f ), respectively, rather than the symmetry breaking pattern SU (N f ) x SU (N f ) → SU (N f ) for QCD with three or more colors and fundamental fermions. In this paper we study the Dirac spectrum for the first two symmetry breaking patterns. Following previous work for the third case we find the Dirac spectrum in the domain λ QCD by means of partially quenched chiral perturbation theory. In particular, this result allows us to calculate the slope of the Dirac spectrum at λ = 0. We also show that for λ 2 Λ QCD (wing L the linear size of the system) the Dirac spectrum is given by a chiral Random Matrix Theory with the symmetries of the Dirac operator

  12. Specification and acceptance testing of nuclear medicine equipment

    International Nuclear Information System (INIS)

    Wegst, A.V.; Erickson, J.J.

    1984-01-01

    The purchase of nuclear medicine equipment is of prime importance in the operation of a clinical service. Failure to properly evaluate the potential uses of the instrumentation and the various operational characteristics of the equipment can often result in the purchase of inappropriate or inferior instruments. The magnitude of the purchase in terms of time and financial investments make it imperative that the purchase be approached in a systematic manner. Consideration of both the intended clinical functions and personnel requirements is important. It is necessary also to evaluate the ability of the equipment vendor to support the instrumentation after the purchase has been completed and the equipment installed in the clinical site. The desired specifications of the instrument characteristics should be stated in terms that can be verified by acceptance testing. The complexity of modern instrumentation and the sensitivity of it to the environment require the buyer to take into account the potential problems of controlling the temperature, humidity, and electrical power of the installation site. If properly and systematically approached, the purchase of new nuclear medicine instrumentation can result in the acquisition of a powerful diagnostic tool which will have a useful lifetime of many years. If not so approached, it may result in the expenditure of a large amount of money and personnel time without the concomitant return in useful clinical service. (author)

  13. Calibration of laboratory equipment and its intermediate verification

    International Nuclear Information System (INIS)

    Remedi, Jorge O.

    2011-01-01

    When a laboratory wants to prove that he has technical competence to carry out tests or calibrations must demonstrate that it has complied with certain requirements that establish , among others, the mandatory : calibrate or verify equipment before putting it into service in order to ensure that it meets to the specifications of laboratory equipment to keep records evidencing the checks that equipment complies with the specification ; perform intermediate checks for maintain confidence in the calibration status of the equipment , ensure that the operation is checked and calibration status of equipment when the equipment goes outside the direct control of the laboratory , before be returned to service, establish a program and procedure for the calibration of equipment; show how determined the calibration periods of their equipment as well as evidence that intermediate checks are suitable for the calibration periods. However, some confusion is observed as to the meaning of the terms 'calibration' and 'verification' of a computer. This paper analyzes applicable documentation and suggests that the differences are generated in part by translations and by characterization concepts upon its usage, that is, if it is legal metrology or assessment conformity. Therefore, this study aims to characterize both concepts , fundamentals to zoom distinguish , outline appropriate strategies for calibration and verification activities to ensure the compliance with regulatory requirements [es

  14. Drawing evaluation report for sampling equipment drawings; TOPICAL

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  15. Functional Requirements for Continuation Period Equipment and Drilling

    International Nuclear Information System (INIS)

    Sweeney, J.J.

    2000-01-01

    For geophysical measurements, creating a functional requirement based on finding a specific-sized target at a specific depth is difficult because of the wide variation of subsurface and surface geologic conditions that can be encountered. An alternative approach used in this paper is to specify functional requirements based on what is needed to search for the effects of a given target within a reasonable background of environmental or geological variation (noise). There is a gap between what the state-of-the-art expert with a large amount of experience can be expected to accomplish and what a non-expert inspector with limited experience can do. There are also limitations because of the Treaty environment (equipment certification, transparency, managed access, etc.); thus, for OSI, we must opt for pragmatic approach. Equipment must be easy to use, rugged, and functional over a wide range of environmental conditions. Equipment should consist of commercially available technology. Well-established operational procedures should be used for taking measurements, reducing data, and presenting data, with software mostly provided by the manufacturer along with the equipment. Equipment should be used in conjunction with WGB-approved position-finding equipment capable of relative position determinations pertinent to the type of equipment and measurement

  16. The digital ultrasonic test unit for automatic equipment

    International Nuclear Information System (INIS)

    Hiraoka, T.; Matsuyama, H.

    1976-01-01

    The operations and features of the ultrasonic test unit used and the digital data processing techniques employed are described. This unit is used for a few hundred multi-channel automatic ultrasonic test equipment

  17. Intra-operative application of optical coherence tomography with an operating microscope.

    Science.gov (United States)

    Just, T; Lankenau, E; Hüttmann, G; Pau, H W

    2009-09-01

    To introduce the use of optical coherence tomography with an operating microscope for intra-operative evaluation of the human larynx. A specially equipped operating microscope with integrated spectral domain optical coherence tomography apparatus was used during microlaryngoscopy. Technical improvements in optical coherence tomography equipment (e.g. pilot beam, variable focal distance, improved image quality and integration into an operating microscope) have enabled greater sensitivity and imaging speed and a non-contact approach. Spectral domain optical coherence tomography now enables a better correlation between optical coherence tomography images and histological findings. With this new technology, the precision of biopsy can be improved during microlaryngoscopy. Use of this new optical coherence tomography technology, integrated into an operating microscope, enables the surgeon to define the biopsy site location and resection plane precisely, while the optical zoom of the operating microscope can be used over the complete range.

  18. The ArF laser for the next-generation multiple-patterning immersion lithography supporting green operations

    Science.gov (United States)

    Ishida, Keisuke; Ohta, Takeshi; Miyamoto, Hirotaka; Kumazaki, Takahito; Tsushima, Hiroaki; Kurosu, Akihiko; Matsunaga, Takashi; Mizoguchi, Hakaru

    2016-03-01

    Multiple patterning ArF immersion lithography has been expected as the promising technology to satisfy tighter leading edge device requirements. One of the most important features of the next generation lasers will be the ability to support green operations while further improving cost of ownership and performance. Especially, the dependence on rare gases, such as Neon and Helium, is becoming a critical issue for high volume manufacturing process. The new ArF excimer laser, GT64A has been developed to cope with the reduction of operational costs, the prevention against rare resource shortage and the improvement of device yield in multiple-patterning lithography. GT64A has advantages in efficiency and stability based on the field-proven injection-lock twin-chamber platform (GigaTwin platform). By the combination of GigaTwin platform and the advanced gas control algorithm, the consumption of rare gases such as Neon is reduced to a half. And newly designed Line Narrowing Module can realize completely Helium free operation. For the device yield improvement, spectral bandwidth stability is important to increase image contrast and contribute to the further reduction of CD variation. The new spectral bandwidth control algorithm and high response actuator has been developed to compensate the offset due to thermal change during the interval such as the period of wafer exchange operation. And REDeeM Cloud™, new monitoring system for managing light source performance and operations, is on-board and provides detailed light source information such as wavelength, energy, E95, etc.

  19. 46 CFR 97.90-1 - Pilot boarding operation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding operation. 97.90-1 Section 97.90-1... OPERATIONS Pilot Boarding Operations § 97.90-1 Pilot boarding operation. (a) The master shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment must be kept clean and in good...

  20. Developing Predictive Maintenance Expertise to Improve Plant Equipment Reliability

    International Nuclear Information System (INIS)

    Wurzbach, Richard N.

    2002-01-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  1. Power system engineering planning, design, and operation of power systems and equipment

    CERN Document Server

    Schlabbach, Juergen

    2014-01-01

    With its focus on the requirements and procedures of tendering and project contracting, this book enables the reader to adapt the basics of power systems and equipment design to special tasks and engineering projects, e.g. the integration of renewable energy sources.

  2. Possible alternatives for diesel powered mobile equipment for the conditions of deep mines

    Energy Technology Data Exchange (ETDEWEB)

    Paraszczak, J.; Kotersi, O [Laval Univ., Quebec City, PQ (Canada). Dept. of Mining, Metallurgical and Materials Engineering

    2008-07-01

    The challenges associated with mining at considerable depths were discussed. Mines such as Kidd Creek, LaRonde and Creighton are deeper than 2500 m. High rock temperature is among the challenges that operators face in such conditions. Conventional diesel powered load-hauling equipment constitute an additional source of heat and noxious gases. As such, more intense ventilation is needed in order to keep ambient temperature and air quality at a level that is acceptable for human workers. This paper examined possible alternatives for diesel powered equipment, including those that are commercially available as well as those that are underdevelopment or in the prototype stage. The equipment was reviewed with reference to the required infrastructure, stage of technology development and progress. The flexibility, practicality and economic viability of the equipment was also investigated. The potential for its use in deep Canadian mines was discussed along with the most promising drive alternatives for vehicles designed for deep mine operations. Electric drives have proven to be effective in many mining applications since they have significant advantages over diesel drives. The characteristics of cable powered equipment, trolley-wire powered equipment, and battery powered equipment were described. The key advantages and disadvantages of hybrid diesel electric equipment were also reviewed along with the viability of power plants based on the use of hydrogen. The principle types of hydrogen power plants include hydrogen combustion engines; HY-Drive systems and fuel cells. It was concluded that although there is no viable alternative for diesel engines at present, Canadian mining companies operating at great depths have made significant progress in these fields and remain among the leaders in mining innovation. 17 refs.

  3. Qualification of class 1e equipment: regulation, technological margins and test experience

    International Nuclear Information System (INIS)

    Pasco, Y.; Le Meur, M.; Henry, J.Y.; Droger, J.P.; Morange, E.; Roubault, J.

    1986-10-01

    French regulation requires licensee to qualify electrical equipment important to safety for service in nuclear power plants to ensure that the equipment can perform its safety function under the set of plausible operating conditions. The French regulatory texts entitled Fundamental safety rules have classified safety related electrical equipment in three main categories: k1, k2, k3, according to their location and operating conditions. The definition of a design basis accident test profile must account for margins applied to thermal hydraulic code outputs. Specific safety margins was added to cover uncertainties in qualification test representativity. Up to now, accidental sequence studies have shown the validity of such a qualification test profile. On the other hand, the results from post accident simulation tests have shown that it is useful not only to validate post accident operating life but also to reveal failures initiated during previous tests [fr

  4. RTNS-II operations guidebook

    International Nuclear Information System (INIS)

    Heikkinen, D.W.

    1985-01-01

    This guidebook is intended to provide training criteria, procedures and guidelines for operation of the RTNS-II neutron sources and ancilliary equipment. Use of this document requires full knowledge of the RTNS-II Facility Safety Procedure (FSP) and any Operational Safety Procedures (OSP) in effect. The RTNS-II FSP defines the hazards which may be encountered at RTNS-II and defines the procedures which must be followed in performing any task including operations. The purpose of this document is to provide a central source of detailed information concerning systems and equipment used in operating the RTNS-II neutron sources on a day-to-day basis. All members of the Operations Group are expected to be familiar with its contents. It is also intended to be used in training new members of the Operations Group

  5. Medical equipment in government health facilities: missed opportunities.

    Science.gov (United States)

    Pardeshi, Geeta S

    2005-01-01

    The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. (1) To identify the problems in different stages of the life cycle. (2) To assess its financial implications and effect on service delivery. Analysis of secondary data from the latest Comptroller and Auditor General (CAG) Reports for the states in India. The study variables were category of equipment, financial implications and problems in the stages of life cycle. Calculation of proportions. A total of forty instances mentioning problems in the first phase of the life cycle of medical equipment were noted in 12 state reports. The equipment from the radiology department (15), equipment in the wards (5), laboratory (3) and operation theatres (4) were the ones most frequently implicated. In a majority of cases the financial implications amounted to twenty-five lakhs. The financial implications were in the form of extra expenditure, unfruitful expenditure or locking of funds. In 25 cases the equipment could not be put to use because of non-availability of trained staff and inadequate infrastructural support. Careful procurement, incoming inspection, successful installation and synchronization of qualified trained staff and infrastructural support will ensure timely onset of use of the equipment.

  6. Selection of equipment for safe shutdown in the event of earthquake

    International Nuclear Information System (INIS)

    Romano Gomez, J.; Perez Alcaniz, T.; Esteban Barriendos, M.

    1993-01-01

    This paper presents the work carried out at the Almaraz Nuclear Power Plant for selecting equipment that contributes to reactor safe shutdown in the event of earthquake. The objective was to comply with the requirements defined by the US NRC in Generic Letter 87-02, 'Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors'. The analysis framework and the method applied followed the generic procedures prepared by the Seismic Qualification Utility Group of which Almaraz NPP is a member, along with other Spanish power plants. The equipment selected shall be subjected to the Application Programme of the above-mentioned Generic Letter. The aim has been to cover the objectives of the programme and, at the same time, to ensure compatibility with plant operating procedures. (author)

  7. Virtual analysis of the remote operation of the ACP

    International Nuclear Information System (INIS)

    Yoon, Ji Sup; Kim, Sung Hyun; Song, Tai Gil; Lim, Kwang Mook

    2005-01-01

    The remote operation of the Advanced Spent Fuel Conditioning Process (ACP) is analyzed by using the 3D graphic simulation tools. The ACP equipment operates in intense radiation fields as well as in a high temperature. Thus, the equipment should be designed in consideration of the remote handling and maintenance. As well as suitable remote handling and maintenance method needs to be provided. To provide such remote operation technology, we developed the graphic simulator which provides the capability of verifying the remote operability of the ACP without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in a computer, not in a real environment. In this way the graphic simulator and substantially reduce the design cost of the remote operation process and the equipment. Also it can provide new operation concept that is more reliable, easier to implement, and easier to understand

  8. Integration of transport and handling equipment at CERN criteria to satisfy operational needs and safety aspects

    CERN Document Server

    Bertone, C; CERN. Geneva. TS Department

    2004-01-01

    Within the last 4 years TS-IC-HM (former ST-HM group) integrated about 150 transport and handling supplies including 29 cranes, 20 fork lift trucks, 60 tunnel vehicles. Most of these are standardised supplies, but very often special functionality has been implemented and the complexity of the equipment has been increased. With the Rocla cryo-dipol transporters even prototype equipment was integrated that had been specially designed for CERN. This paper discusses the differences regarding the actions that have to be performed when the different kind of equipment have to be integrated.

  9. Equipment for evaluation of the characteristics of electronic-optic converters

    International Nuclear Information System (INIS)

    Getsov, Petar; Mardirossian, Garo; Nedkov, Rumen; Stoyanov, Stiliyan; Bo, Wang; Prokopenko, Olga; Boyanov, Petar

    2018-01-01

    In this paper we consider the concept, structure, operation and application of original equipment for evaluation of the characteristics of electronic-optic converters (EOC) created in the Space Research and Technologies Institute at the Bulgarian Academy of Sciences. The equipment is recognized as an invention and it is subject to patent protection. Key words: electronic-optic converter, infrared radiation, night surveillance devices

  10. Operational proof of automation

    International Nuclear Information System (INIS)

    Jaerschky, R.; Reifenhaeuser, R.; Schlicht, K.

    1976-01-01

    Automation of the power plant process may imply quite a number of problems. The automation of dynamic operations requires complicated programmes often interfering in several branched areas. This reduces clarity for the operating and maintenance staff, whilst increasing the possibilities of errors. The synthesis and the organization of standardized equipment have proved very successful. The possibilities offered by this kind of automation for improving the operation of power plants will only sufficiently and correctly be turned to profit, however, if the application of these technics of equipment is further improved and if its volume is tallied with a definite etc. (orig.) [de

  11. Operational proof of automation

    International Nuclear Information System (INIS)

    Jaerschky, R.; Schlicht, K.

    1977-01-01

    Automation of the power plant process may imply quite a number of problems. The automation of dynamic operations requires complicated programmes often interfering in several branched areas. This reduces clarity for the operating and maintenance staff, whilst increasing the possibilities of errors. The synthesis and the organization of standardized equipment have proved very successful. The possibilities offered by this kind of automation for improving the operation of power plants will only sufficiently and correctly be turned to profit, however, if the application of these equipment techniques is further improved and if it stands in a certain ratio with a definite efficiency. (orig.) [de

  12. Equipment and techniques developed for the repair of reactor standpipes

    International Nuclear Information System (INIS)

    Hartnell, P.; Kirton-Darling, H.F.R.; Walton, D.N.

    1993-01-01

    In-service cracks had developed in welds in the fabrication at the bottom of the standpipe liner at Hinkley Point-B and Hunterston-B reactors. A joint team investigating these cracks determined that the hot gas flow patterns in the plug unit to standpipe liner annulus were unstable. This had led to thermal stressing and consequent cracking of the standpipe liner welds. In developing a solution consideration was to be given to access down the standpipe for equipment, ambient temperatures, radiation levels and safety considerations. The procedures and equipment developed are described. (author)

  13. Quality control of diagnostic x-ray equipment and film processing

    International Nuclear Information System (INIS)

    1993-01-01

    According to the section 40 of the Radiation Act (592/92), the licensee is required in Finland to make the arrangements to control the function of the radiation equipment and related facilities used for medical procedures. The guide explains how quality control can be organized for diagnostic x-ray equipment. It also gives recommendations for constancy tests for conventional x-ray radiographic and fluoroscopic equipment and for film processing. The recommendations are based on the publications and statements of the International Committee for Radiation Protection (ICRP) and standardization organizations. The intention is that the operators of x-ray equipment or the maintenance personnel are able to perform the quality control tests presented in the guide

  14. Patterning techniques for next generation IC's

    Science.gov (United States)

    Balasinski, A.

    2007-12-01

    Reduction of linear critical dimensions (CDs) beyond 45 nm would require significant increase of the complexity of pattern definition process. In this work, we discuss the key successor methodology to the current optical lithography, the Double Patterning Technique (DPT). We compare the complexity of CAD solutions, fab equipment, and wafer processing with its competitors, such as the nanoimprint (NIL) and the extreme UV (EUV) techniques. We also look ahead to the market availability for the product families enabled using the novel patterning solutions. DPT is often recognized as the most viable next generation lithography as it utilizes the existing equipment and processes and is considered a stop-gap solution before the advanced NIL or EUV equipment is developed. Using design for manufacturability (DfM) rules, DPT can drive the k1 factor down to 0.13. However, it faces a variety of challenges, from new mask overlay strategies, to layout pattern split, novel OPC, increased CD tolerances, new etch techniques, as well as long processing time, all of which compromise its return on investment (RoI). In contrast, it can be claimed e.g., that the RoI is the highest for the NIL but this technology bears significant risk. For all novel patterning techniques, the key questions remain: when and how should they be introduced, what is their long-term potential, when should they be replaced, and by what successor technology. We summarize the unpublished results of several panel discussions on DPT at the recent SPIE/BACUS conferences.

  15. Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations

    International Nuclear Information System (INIS)

    Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

    1997-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation's first and world's largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage

  16. A Study on Performance and Safety Tests of Electrosurgical Equipment

    Directory of Open Access Journals (Sweden)

    Tavakoli Golpaygani A.

    2016-09-01

    Full Text Available Introduction: Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient’s safety and management of the risks associated with the use of high and low frequency electrical currents on human body. Material and Methods: The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public was evaluated in one of the provinces of Iran according to international and national standards. Results: The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Conclusion: Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  17. UOE Pipe Manufacturing Process Simulation: Equipment Designing and Construction

    Science.gov (United States)

    Delistoian, Dmitri; Chirchor, Mihael

    2017-12-01

    UOE pipe manufacturing process influence directly on pipeline resilience and operation capacity. At present most spreaded pipe manufacturing method is UOE. This method is based on cold forming. After each technological step appears a certain stress and strain level. For pipe stress strain study is designed and constructed special equipment that simulate entire technological process.UOE pipe equipment is dedicated for manufacturing of longitudinally submerged arc welded DN 400 (16 inch) steel pipe.

  18. Benefits Of Vibration Analysis For Development Of Equipment In HLW Tanks - 12341

    International Nuclear Information System (INIS)

    Stefanko, D.; Herbert, J.

    2012-01-01

    Vibration analyses of equipment intended for use in the Savannah River Site (SRS) radioactive liquid waste storage tanks are performed during pre-deployment testing and has been demonstrated to be effective in reducing the life-cycle costs of the equipment. Benefits of using vibration analysis to identify rotating machinery problems prior to deployment in radioactive service will be presented in this paper. Problems encountered at SRS and actions to correct or lessen the severity of the problem are discussed. In short, multi-million dollar cost saving have been realized at SRS as a direct result of vibration analysis on existing equipment. Vibration analysis of equipment prior to installation can potentially reduce inservice failures, and increases reliability. High-level radioactive waste is currently stored in underground carbon steel waste tanks at the United States Department of Energy (DOE) Savannah River Site and at the Hanford Site, WA. Various types of rotating machinery (pumps and separations equipment) are used to manage and retrieve the tank contents. Installation, maintenance, and repair of these pumps and other equipment are expensive. In fact, costs to remove and replace a single pump can be as high as a half million dollars due to requirements for radioactive containment. Problems that lead to in-service maintenance and/or equipment replacement can quickly exceed the initial investment, increase radiological exposure, generate additional waste, and risk contamination of personnel and the work environment. Several different types of equipment are considered in this paper, but pumps provide an initial example for the use of vibration analysis. Long-shaft (45 foot long) and short-shaft (5-10 feet long) equipment arrangements are used for 25-350 horsepower slurry mixing and transfer pumps in the SRS HLW tanks. Each pump has a unique design, operating characteristics and associated costs, sometimes exceeding a million dollars. Vibration data are routinely

  19. BENEFITS OF VIBRATION ANALYSIS FOR DEVELOPMENT OF EQUIPMENT IN HLW TANKS - 12341

    Energy Technology Data Exchange (ETDEWEB)

    Stefanko, D.; Herbert, J.

    2012-01-10

    Vibration analyses of equipment intended for use in the Savannah River Site (SRS) radioactive liquid waste storage tanks are performed during pre-deployment testing and has been demonstrated to be effective in reducing the life-cycle costs of the equipment. Benefits of using vibration analysis to identify rotating machinery problems prior to deployment in radioactive service will be presented in this paper. Problems encountered at SRS and actions to correct or lessen the severity of the problem are discussed. In short, multi-million dollar cost saving have been realized at SRS as a direct result of vibration analysis on existing equipment. Vibration analysis of equipment prior to installation can potentially reduce inservice failures, and increases reliability. High-level radioactive waste is currently stored in underground carbon steel waste tanks at the United States Department of Energy (DOE) Savannah River Site and at the Hanford Site, WA. Various types of rotating machinery (pumps and separations equipment) are used to manage and retrieve the tank contents. Installation, maintenance, and repair of these pumps and other equipment are expensive. In fact, costs to remove and replace a single pump can be as high as a half million dollars due to requirements for radioactive containment. Problems that lead to in-service maintenance and/or equipment replacement can quickly exceed the initial investment, increase radiological exposure, generate additional waste, and risk contamination of personnel and the work environment. Several different types of equipment are considered in this paper, but pumps provide an initial example for the use of vibration analysis. Long-shaft (45 foot long) and short-shaft (5-10 feet long) equipment arrangements are used for 25-350 horsepower slurry mixing and transfer pumps in the SRS HLW tanks. Each pump has a unique design, operating characteristics and associated costs, sometimes exceeding a million dollars. Vibration data are routinely

  20. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... 25- and 50-Year Fellows Recognition Surgical History Group Icons in Surgery Archives Catalog Additional Resources Contact ... for after the operation including review of attached equipment and ways for you to actively participate to ...

  1. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Disaster Management and Emergency Preparedness Rural Trauma Team Development Course Trauma Evaluation and Management Trauma CME The ... for after the operation including review of attached equipment and ways for you to actively participate to ...

  2. Assessment of the performance of containment and surveillance equipment part 1: methodology

    International Nuclear Information System (INIS)

    Rezniczek, A.; Richter, B.

    2009-01-01

    Equipment performance aims at the creation of relevant data. As Containment and Surveillance (C/S) is playing an ever increasing role in safeguards systems, the issue of how to assess the performance of C/S equipment is being addressed by the ESARDA Working Group on C/S. The issue is important not only for the development of appropriate safeguards approaches but also for the review of existing approaches with regard to the implementation of the Additional Protocol (A P) and Integrated Safeguards. It is expected that the selection process of appropriate equipment, especially for unattended operation, is facilitated by the availability of methods to determine the performance of such equipment. Apart from EURATOM, the users of assessment methodologies would be the International Atomic Energy Agency (IAEA), plant operators, and instrument developers. The paper describes a non-quantitative performance assessment methodology. A structured procedure is outlined that allows assessing the suitability of different C/S instrumentation to comply with the objectives of its application. The principle to determine the performance of C/S equipment is to define, based on safeguards requirements, a task profile and to check the performance profile against the task profile. The performance profile of C/S equipment can be derived from the functional specifications and design basis tolerances provided by the equipment manufacturers.

  3. Potentially damaging failure modes of high- and medium-voltage electrical equipment

    International Nuclear Information System (INIS)

    Hoy, H.C.

    1984-01-01

    The high- and medium-voltage electrical equipment failures of both nuclear and nonnuclear electric utilities have been reviewed for possible disruptive failure modes that would be of special concern in a nuclear power plant. The resulting emphasis was on the electrical faults of transformers, switchgear (circuit breakers), lightning (surge) arrestors, high-voltage cabling and buswork, control boards, and other electrical equipment that, through failure, can be the initiating event that may expand the original fault to nearby or associated equipment. Many failures of such equipment were found and documented, although the failure rate of electrical equipment in utilities is historically quite low. Nuclear plants record too few failures to be statistically valid, but failures that have been recorded show that good design usually restricts the failure to a single piece of equipment. Conclusions and recommendations pertaining to the design, maintenance, and operation of the affected electrical equipment are presented

  4. [Prevention of medical device-related adverse events in hospitals: Specifying the recommendations of the German Coalition for Patient Safety (APS) for users and operators of anaesthesia equipment].

    Science.gov (United States)

    Bohnet-Joschko, Sabine; Zippel, Claus; Siebert, Hartmut

    2015-01-01

    The use and organisation of medical technology has an important role to play for patient and user safety in anaesthesia. Specification of the recommendations of the German Coalition for Patient Safety (APS) for users and operators of anaesthesia equipment, explore opportunities and challenges for the safe use and organisation of anaesthesia devices. We conducted a literature search in Medline/PubMed for studies dealing with the APS recommendations for the prevention of medical device-related risks in the context of anaesthesia. In addition, we performed an internet search for reports and recommendations focusing on the use and organisation of medical devices in anaesthesia. Identified studies were grouped and assigned to the recommendations. The division into users and operators was maintained. Instruction and training in anaesthesia machines is sometimes of minor importance. Failure to perform functional testing seems to be a common cause of critical incidents in anaesthesia. There is a potential for reporting to the federal authority. Starting points for the safe operation of anaesthetic devices can be identified, in particular, at the interface of staff, organisation, and (anaesthesia) technology. The APS recommendations provide valuable information on promoting the safe use of medical devices and organisation in anaesthesia. The focus will be on risks relating to the application as well as on principles and materials for the safe operation of anaesthesia equipment. Copyright © 2015. Published by Elsevier GmbH.

  5. Consolidating a Distributed Compound Management Capability into a Single Installation: The Application of Overall Equipment Effectiveness to Determine Capacity Utilization.

    Science.gov (United States)

    Green, Clive; Taylor, Daniel

    2016-12-01

    Compound management (CM) is a critical discipline enabling hit discovery through the production of assay-ready compound plates for screening. CM in pharma requires significant investments in manpower, capital equipment, repairs and maintenance, and information technology. These investments are at risk from external factors, for example, new technology rendering existing equipment obsolete and strategic site closures. At AstraZeneca, we faced the challenge of evaluating the number of CM sites required to support hit discovery in response to site closures and pressure on our operating budget. We reasoned that overall equipment effectiveness, a tool used extensively in the manufacturing sector, could determine the equipment capacity and appropriate number of sites. We identified automation downtime as the critical component governing capacity, and a connection between automation downtime and the availability of skilled staff. We demonstrated that sufficient production capacity existed in two sites to meet hit discovery demand without the requirement for an additional investment of $7 million in new facilities. In addition, we developed an automated capacity model that incorporated an extended working-day pattern as a solution for reducing automation downtime. The application of this solution enabled the transition to a single site, with an annual cost saving of $2.1 million. © 2015 Society for Laboratory Automation and Screening.

  6. Remote removal of contaminated equipment from a radiochemical engineering cell

    International Nuclear Information System (INIS)

    Scharnhorst, N.L.; Bryan, G.H.; Bjorklund, W.J.

    1984-01-01

    Large-scale vitrification equipment in a radioactive cell was dismantled and packed for burial through the use of viewing windows with manipulators, two overhead cranes, and unique tools for disassembling, grabbing, and handling the equipment components. An air-driven reciprocating hacksaw, remotely placed and operated, was used to cut large structural members inaccessible by the manipulators. Remotely operated circular saws and a plasma torch were used to cut calciners, furnaces, storage vessels, piping, pumps, and structural members into pieces that were placed safely into shielded burial boxes. This engineering effort was accomplished without any exposure problems in approximately 17 months, which required almost 10 equivalent worker-years. 8 figures, 1 table

  7. Training simulator for advanced gas-cooled reactor (AGR) shutdown sequence equipment

    International Nuclear Information System (INIS)

    Shankland, J.P.; Nixon, G.L.

    1978-01-01

    Successful shutdown of nuclear plant is of prime importance for both safety and economic reasons and large sums of money are spent on equipment to make shutdowns fully automatic, thus removing the possibility of operator errors. While this aim can largely be realized, one must consider the possibility of automatic equipment or plant failures when operators are required to take manual action, and off-line training facilities should be available to operating staff to minimize the risk of incorrect actions being taken. This paper presents the practice adopted at Hunterston 'B' Nuclear Power Station to solve this problem and concerns the computer-based training simulator for the Reactor Shutdown Sequence Equipment (RSSE) which was commissioned in January 1977. The plant associated with shutdown is briefly described and the reasoning which shows the need for a simulator is outlined. The paper also gives details of the comprehensive facilities available on the simulator and goes on to describe the form that shutdown training takes and the experience gained at this time. (author)

  8. 1E Qualification of Electrical Equipment - Requirement for Safety Nuclear Power Plants

    International Nuclear Information System (INIS)

    Geambasu, C.; Segarceanu, D.; Albu, J.

    2002-01-01

    The paper presents the qualification methods of the safety related equipment according to the safety class 1E. There are presented the qualification principles, procedure and documents, emphasis being laid on the qualification approach by type tests. This approach assumes the equipment test under both normal and accident conditions (design basis events) simulating the operational conditions and covers the largest part of electrical equipment from a nuclear power plant.The safety related equipment is to be qualified is subjected to a sequential test that will be detailed in the paper. (author)

  9. Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program

    International Nuclear Information System (INIS)

    McGuire, L.L.

    1991-01-01

    The Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program serves two purposes. The first is to track temperature trends during normal plant operation in areas where suspected deviations from established environmental profiles exist. This includes the use of Resistance Temperature Detectors, Recorders, and Temperature Dots for evaluation of equipment qualified life for comparison with tested parameters and the established Environmental Design Profile. It also may be used to determine the location and duration of steam leaks for effect on equipment qualified life. The second purpose of this program is to aid HVAC design engineers in determining the source of heat outside anticipated design parameters. Resistance Temperature Detectors, Recorders, and Temperature Dots are also used for this application but the results may include design changes to eliminate the excess heat or provide qualified equipment (cable) to withstand the elevated temperature, splitting of environmental zones to capture accurate temperature parameters, or continued environmental monitoring for evaluation of equipment located in hot spots

  10. Managing EHS of PV-Related Equipment at the National Renewable Energy Laboratory: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    McCuskey, T.; Nelson, B. P.

    2012-06-01

    Managing environment, health, and safety (EHS) risks at a national laboratory, or university, can be intimidating to a researcher who is focused on research results. Laboratory research and development (R&D) operations are often driven by scientists with limited engineering support and lack well-refined equipment development resources. To add to the burden for a researcher, there is a plethora of codes, standards, and regulations that govern the safe installation and operation of photovoltaic-related R&D equipment -- especially those involving hazardous production materials. To help guide the researcher through the vast list of requirements, the EHS office at NREL has taken a variety of steps. Organizationally, the office has developed hazard-specific laboratory-level procedures to govern particular activities. These procedures are a distillation of appropriate international codes, fire agencies, SEMI standards, U.S. Department of Energy orders, and other industry standards to those necessary and sufficient to govern the safe operation of a given activity. The EHS office works proactively with researchers after a concept for a new R&D capability is conceived to help guide the safe design, acquisition, installation, and operation of the equipment. It starts with a safety assessment at the early stages such that requirements are implemented to determine the level of risk and degree of complexity presented by the activity so appropriate controls can be put in place to manage the risk. As the equipment requirements and design are refined, appropriate equipment standards are applied. Before the 'to-build' specifications are finalized, a process hazard analysis is performed to ensure that no single-point failure presents an unacceptable risk. Finally, as the tool goes through construction and installation stages, reviews are performed at logical times to ensure that the requisite engineering controls and design are in place and operational. Authorization to

  11. Guidance for the licensing procedure concerning the application of radiographic equipment

    International Nuclear Information System (INIS)

    1987-01-01

    According to article 4 of the Ordinance on the Implementation of Atomic Safety and Radiation Protection dated 11 October 1984 the operation of radiographic equipment has to be licensed. The personnel and material requirements that are to be fulfilled by a licensee prior to commissioning X-ray or gamma equipment, are discussed in detail

  12. [Fuel Rod Consolidation Project]: The estimated total life cycle cost for the 30-year operation of prototypical consolidation demonstration equipment: Volume 4, Phase 2

    International Nuclear Information System (INIS)

    1987-01-01

    The Total Life Cycle Costs have been developed for the construction, operation and decommissioning of a single line of hot-cell-enclosed production consolidation equipment operating on spent fuel at the rate of 750 MTU/year for 30 years. The cost estimate is for a single production line that is part of an overall facility at either a Monitored Retrievable Storage or a Repository facility. This overall facility would include other capabilities and possibly other consolidation lines. However, no costs were included in the cost estimate for other portions of the plant, except that staff costs include an overhead charge that reflects the overhead support services in an overall facility

  13. International Economic Association on organization of co-operative production and development of equipment and providing technical assistance in construction of nuclear power plants - ''INTERATOMENERGO''

    International Nuclear Information System (INIS)

    Mal'tsev, N.D.

    1979-01-01

    History is stated of foundation of the International Economic Association ''Interatomenergo''. Structure is given of the Association and the list of main problems to be solved by it. Project is given of the programm of co-operation in the field of scientific and technical works as well as of design and projecting works in creation of new types of equipment for nuclear power plants, in particular, creation of serial power units with improved WWER-1000 reactor. Directions are stated of activity of the Association in the field of providing assistance in construction and exploitation of nuclear power plants as well as in training of operational personnel [ru

  14. Design considerations, tooling and equipment for remote in-service inspection of radioactive piping and pressure vessel systems

    International Nuclear Information System (INIS)

    Schmoker, D.S.; Swannack, D.L.

    1983-01-01

    In-Service Inspection programs are performed to monitor and verify the integrity of a nuclear power plant's primary pressure boundaries. Early detection of abnormal structural or material degradation could preclude serious damage to plant systems. This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  15. Developing ''smar'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; Spencer, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of : (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased funding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the S mart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations . This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABBCENP), Sandia National Laboratories, Duke Engineering and Services (DEandS), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of ''smart'' equipment and predicitve maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the ''smart'' quipment program will: 1. Identify the prioritize nulcear plant equipment that would most likely benefit from adding smart features, 2. Developa methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i. e. ''smart'' equipment), 3. Developa methodology to provide plant operators with real-time information through ''smart'' equipment Man-Machine Interfaces (MMI) to support their decision making, 4. Demonstrate the methodology on a targeted component and/or system, 5. Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed

  16. Problems in diagnosing and forecasting power equipment reliability

    Energy Technology Data Exchange (ETDEWEB)

    Popkov, V I; Demirchyan, K S

    1979-11-01

    This general survey deals with approaches to the resolution of such problems as the gathering, analysis and systematization of data on component defects in power equipment and setting up feedback with the manufacturing plants and planning organizations to improve equipment reliability. Such efforts on the part of designers, manufacturers and operating and repair organizations in analyzing faults in 300 MW turbogenerators during 1974-1977 reduced the specific fault rate by 20 to 25% and the downtime per failure by 35 to 40%. Since power equipment should operate for several hundreds of thousands of hours (20 to 30 years) and the majority of power components have guaranteed service lives of no more than 10/sup 5/ hours, an extremely difficult problem is the determination of the reliability of equipment past the 10/sup 5/ point. The present trend in the USSR Unified Power System towards increasing the number of shutdowns and startups, which in the case of turbogenerators of up 1200 MW power can reach 7500 to 10,000 cycles is noted. Other areas briefly treated are: MHD generator reliability and economy; nuclear power plant reliability and safety; the reliability of high-power high-voltage thyristor converters; the difficulties involved in scale modeling of power system reliability and the high cost of the requisite full-scale studies; the poor understanding of long term corrosion and erosion processes. The review concludes with arguments in favor of greater computerization of all aspects of power system management.

  17. Containment Response Analysis for Equipment Qualification of Kori Nuclear Power Plant Unit 3 and 4

    Energy Technology Data Exchange (ETDEWEB)

    Byun, Choong Sup; Song, Dong Soo; Hwang, Yong Jun [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Seo, Kwi Hyun; Song, Wan Jung [ENERGEO Inc., Sungnam (Korea, Republic of)

    2006-07-01

    Equipment that is used to perform a necessary safety function must be capable of maintaining functional operability under all service condition postulated to occur during the installed life for the time it is required. The pressure and temperature analyses for loss of coolant accident and main steam line break accident provide the bounding test envelope inside containment for the operability evaluation of safety equipment in harsh environmental. This paper describes the results of the containment pressure and temperature analysis for the equipment qualification (EQ) envelopes of Kori unit 3 and 4.

  18. About water chemistry influence on equipment reliability of NPP with RBMK-1000

    International Nuclear Information System (INIS)

    Berezina, I.G.; Styazhkin, P.S.; Kritskij, V.G.

    2001-01-01

    In the paper the experience of a quantitative valuation of coolant quality influence on a reliability of some equipment elements of NPP with RBMK-1000 is offered. The choice is made of coolant quality integral parameter. The connection between indices values of coolant quality and reliability of major elements of circulation circuit equipment (including fuel claddings) is established. The reliability improvement of equipment elements operation is supported by high water chemistry quality. (orig.)

  19. Performance of indigenous resistance welding equipment for PHWR fuel fabrication in NFC

    International Nuclear Information System (INIS)

    Hemantha Rao, G.V.S.; Jayaraj, R.N.; Prakash, M.S.; Gupta, U.C.; Ganguly, C.

    1999-01-01

    Indigenisation of critical equipment for manufacturing of PHWR fuel and automation in the production line have been the main thrust in NFC in recent years. As part of this endeavour, resistance welding equipment for end plug welding of Zircaloy-4 clad Uranium Oxide fuel pin and end plates of 19-element fuel bundles have been developed. The paper discusses the equipment design features, critical operating parameters and performance of these indigenous welding machines. (author)

  20. The Effects of Aging on the Costs of Operating and Maintaining Military Equipment

    National Research Council Canada - National Science Library

    Kiley, Gregory

    2001-01-01

    .... According to one interpretation, decisions in the 199Os to reduce purchases of new equipment left the military with aging fleets of ships, aircraft, and armored vehicles that are increasingly expensive to maintain...

  1. 49 CFR 393.130 - What are the rules for securing heavy vehicles, equipment and machinery?

    Science.gov (United States)

    2010-10-01

    ... heavy vehicles, equipment and machinery? (a) Applicability. The rules in this section apply to the transportation of heavy vehicles, equipment and machinery which operate on wheels or tracks, such as front end... heavy vehicles, equipment or machinery with crawler tracks or wheels. (1) In addition to the...

  2. Catalog of physical protection equipment. Book 3: Volume VI. Automated response components

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    The Catalog of Physical Protection Equipment presents information on currently available physical protection equipment that could be employed to safeguard special nuclear materials. The primary source of information was the responses of manufacturers and vendors to requests for literature and data. All equipment listed in the Catalog has been screened in accordance with the following general criteria, and only items meeting one or more of these criteria have been included: (1) equipment is commercially available off-the-shelf; (2) equipment is currently in use at commercial nuclear facilities licensed or to be licensed by NRC; (3) equipment is applicable for use at nuclear facilities licensed or to be licensed by NRC; (4) equipment can operate in the environmental conditions present at nuclear facilities; and (5) equipment is not designed solely or primarily for residential use. The final report describes the methodology and rationale used to create the Catalog of Physical Protection Equipment

  3. Study for process and equipment design of wet gelation stages in vibropacking process

    International Nuclear Information System (INIS)

    Tanimoto, Ryoji; Kikuchi, Toshiaki; Tanaka, Hirokazu; Amino, Masaki; Yanai, Minoru

    2004-02-01

    Process and layout design of external wet gelation stages in vibropacking process was examined for the feasibility study of commercialized FBR cycle system. In this study, following process stages for the oxide core fuel production line were covered, that is, solidification, washing, drying, calcination, reduction, sintering stages including interim storage of sintering particles and reagent recovery stage. The main results obtained by this study are as follows: (1) Based on the process examination results conducted previously, process-flow, mass-balance and number of production line/equipment were clarified. The process is covered from the receive tank of feed solution to the interim storage equipment. Reagent recovery process-flow, mass-balance were also clarified. And preliminary design of the main equipment was reexamined. (2) Normal operation procedure and the procedure after process failure were summarized along with a remote automated operation procedure. Operation sequence of each production line was mapped out by using a time-chart. (3) Design outline of reagent recovery equipments, installed to recover waste liquid from the wet gelation stages in the view of environmental impact were examined. Effective techniques such as collection of solvent, residue waste treatment method were examined its applicability and selected. Schematic block diagram was presented. (4) Analytical items and analyzing apparatus were extracted taking into account of quality control and process management. Analytical sample taking position and frequency of sampling were also examined. (5) A schematic layout drawing of main manufacturing process and reagent recovery process was presented taking into account of material handling. (6) A feature of the operating rate at each process stage was examined by analyzing failure rate reliability of each component. applying the reliability-centred method. (RCM), the operating rate was evaluated and annual maintenance period was estimated using

  4. Data Network Equipment Energy Use and Savings Potential in Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lanzisera, Steven; Nordman, Bruce; Brown, Richard E.

    2010-06-09

    Network connectivity has become nearly ubiquitous, and the energy use of the equipment required for this connectivity is growing. Network equipment consists of devices that primarily switch and route Internet Protocol (IP) packets from a source to a destination, and this category specifically excludes edge devices like PCs, servers and other sources and sinks of IP traffic. This paper presents the results of a study of network equipment energy use and includes case studies of networks in a campus, a medium commercial building, and a typical home. The total energy use of network equipment is the product of the stock of equipment in use, the power of each device, and their usage patterns. This information was gathered from market research reports, broadband market penetration studies, field metering, and interviews with network administrators and service providers. We estimate that network equipment in the USA used 18 TWh, or about 1percent of building electricity, in 2008 and that consumption is expected to grow at roughly 6percent per year to 23 TWh in 2012; world usage in 2008 was 51 TWh. This study shows that office building network switches and residential equipment are the two largest categories of energy use consuming 40percent and 30percent of the total respectively. We estimate potential energy savings for different scenarios using forecasts of equipment stock and energy use, and savings estimates range from 20percent to 50percent based on full market penetration of efficient technologies.

  5. Remote operation and maintenance demonstration facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D.; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock up various hot cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups

  6. WRAP TRUPACT loading systems operational test report

    International Nuclear Information System (INIS)

    DOSRAMOS, E.V.

    1999-01-01

    This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion

  7. Repository Planning, Design, and Engineering: Part II-Equipment and Costing.

    Science.gov (United States)

    Baird, Phillip M; Gunter, Elaine W

    2016-08-01

    Part II of this article discusses and provides guidance on the equipment and systems necessary to operate a repository. The various types of storage equipment and monitoring and support systems are presented in detail. While the material focuses on the large repository, the requirements for a small-scale startup are also presented. Cost estimates and a cost model for establishing a repository are presented. The cost model presents an expected range of acquisition costs for the large capital items in developing a repository. A range of 5,000-7,000 ft(2) constructed has been assumed, with 50 frozen storage units, to reflect a successful operation with growth potential. No design or engineering costs, permit or regulatory costs, or smaller items such as the computers, software, furniture, phones, and barcode readers required for operations have been included.

  8. Peri-operative communication patterns and media usage--implications for systems design.

    Science.gov (United States)

    Karlsen, Ero S; Toussaint, Pieter Jelle

    2010-01-01

    Inter-hospital communication amounts for a great deal of clinicians' work time. While communication is essential to coordinate care, it can also be time consuming and interruptive, and breakdown in communication is an important source of medical errors. One contributor to the interruptive nature of communication is the use of synchronous media, and there is clearly a potential for novel technologies. To assess communication patterns and media usage we performed an ethnographic field study in the peri-operative environment at a Norwegian hospital, as well as interviews with nurses. We analyze the results with regards to choice of media, characteristics of the conversations taking place and meta-messages, and account for addressing, obtrusiveness and information richness in the message exchanges. We find a relative high degree of interruptiveness in communication, and ascribe it to 1) a lack of situational awareness between locations in the peri-operative domain, as well as 2) use of synchronous media. This suggests that design of novel technology for intra-hospital communication should aim at supporting sender-receiver awareness and signaling of availability.

  9. 46 CFR 196.95-1 - Pilot boarding operations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Pilot boarding operations. 196.95-1 Section 196.95-1... Pilot Boarding Operations § 196.95-1 Pilot boarding operations. (a) The master shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment must be kept clean and in good working order...

  10. Defense Logistics: Army and Marine Corps Cannot Be Assured That Equipment Reset Strategies Will Sustain Equipment Availability While Meeting Ongoing Operational Requirements

    National Research Council Canada - National Science Library

    Solis, William M; Schmitt, David A; Brown, Renee; Cristinzio, Frank; Hartig, Luke; Helt, Brent; Rogers, Donna M; Song, Yong; Storts, Maria

    2007-01-01

    .... Because of the potential for equipment reset costs to affect the Department of Defense's (DoD) future budget requirements and related readiness concerns, GAO initiated this review under the Comptroller General's authority...

  11. Laser alignment of rotating equipment at PNL

    International Nuclear Information System (INIS)

    Berndt, R.H.

    1994-05-01

    Lateral vibration in direct-drive equipment is usually caused by misalignment. Over the years, because of the need to improve on techniques and ways of working more efficiently, various types of alignment methods have evolved. In the beginning, craftsmen used a straight-edge scale across the coupling with a feeler gauge measuring the misalignment error. This is still preferred today for aligning small couplings. The industry has since decided that alignment of large direct-drive equipment needed a more accurate type of instrumentation. Rim and face is another of the first alignment methods and is used on all sizes of equipment. A disadvantage of the rim and face method is that in most cases the coupling has to be disassembled. This can cause alignment problems when the coupling is reassembled. Also, the rim and face method is not fast enough to work satisfactorily on alignment of thermally hot equipment. Another concern is that the coupling has to be manufactured accurately for correct rim and face readings. Reverse dial alignment is an improvement over the rim and face method, and depending on the operator's experience, this method can be very accurate. A good training program along with field experience will bring the operator to a proper level of proficiency for a successful program. A hand-held computer with reverse dial calculations in memory is a must for job efficiency. An advantage over the rim and face method is that the coupling is not disassembled and remains locked together. Reverse dial instrumentation measures from both shaft center lines, rather than the coupling surface so the machining of the coupling during manufacture is not a major concern

  12. EPERC: The European Pressure Equipment Research Council

    International Nuclear Information System (INIS)

    Darlaston, J.; McAllister, S.

    1998-01-01

    The European Pressure Equipment Research Council (EPERC) is a European Network of industries, research laboratories, inspection bodies and governmental institutions set up to foster co-operative research for the greater benefit of the European industry. The concept of a European Research Council originated at the PVRC meeting in Cannes in 1989 and since this time volunteers from the industry, research laboratories and of the European Commission Joint Research Centre, Petten have worked together to create a Statute for EPERC. In the context of the pressure equipment industry, the creation of EPERC is extremely pertinent, since in the near future, a Council directive on pressure equipment will replace the existing national regulations. In parallel to this, work is in progress for the elaboration of European Standards. It is useful to recall that ''Harmonised Standards'' will be the privileged means of complying with the Essential Safety Requirements of the directive. (author)

  13. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    suppliers and the construction, as the facility staff even after the supplier's commitment must be familiar with how the new components and systems operate. Part of this is that higher demands should be made on suppliers, concerning the documentation and to provide knowledge of new failure modes and protection features of the new equipment. Cooperation between nuclear power plants, where the purchase to a larger degree is coordinated is increasing, and this gives the plants a greater opportunity to make greater demands on suppliers

  14. Fuel pattern recognition device

    International Nuclear Information System (INIS)

    Sato, Tomomi.

    1995-01-01

    The device of the present invention monitors normal fuel exchange upon fuel exchanging operation carried out in a reactor of a nuclear power plant. Namely, a fuel exchanger is movably disposed to the upper portion of the reactor and exchanges fuels. An exclusive computer receives operation signals of the fuel exchanger during operation as inputs, and outputs reactor core fuel pattern information signals to a fuel arrangement diagnosis device. An underwater television camera outputs image signals of a fuel pattern in the reactor core to an image processing device. If there is any change in the image signals for the fuel pattern as a result of the fuel exchange operation of the fuel exchanger, the image processing device outputs the change as image signals to the fuel pattern diagnosis device. The fuel pattern diagnosis device compares the pattern information signals from the exclusive computer with the image signals from the image processing device, to diagnose the result of the fuel exchange operation performed by the fuel exchanger and inform the diagnosis by means of an image display. (I.S.)

  15. The development of special equipment amplitude detection instrument based on DSP

    International Nuclear Information System (INIS)

    Dai Sidan; Chen Ligang; Lan Peng; Wang Huiting; Zhang Liangxu; Wang Lin

    2014-01-01

    Development and industrial application of special equipment plays an important role in the development of nuclear energy process. Equipment development process need to do a lot of tests, amplitude detection is a key test,it can analysis the device's electromechanical and physical properties. In the industrial application, the amplitude detection can effectively reflect the operational status of the current equipment, the equipment can also be a certain degree of fault diagnosis, identify problems in a timely manner. The main development target in this article is amplitude detection of special equipment. This article describes the development of special equipment amplitude detection instrument. The instrument uses a digital signal processor (DSP) as the central processing unit, and uses the DSP + CPLD + high-speed AD technology to build a complete set of high-precision signal acquisition and analysis processing systems, rechargeable lithium battery as the powered device. It can do a online monitoring of special equipment amplitude, speed parameters by acquiring and analysing the tachometer signal in the special equipment, and locally display through the LCD screen. (authors)

  16. A compliance testing program for diagnostic X-ray equipment

    International Nuclear Information System (INIS)

    Hutchinson, D.E.; Cobb, B.J.; Jacob, C.S.

    1999-01-01

    Compliance testing is nominally that part of a quality assurance program dealing with those aspects of X-ray equipment performance that are subject to radiation control legislation. Quality assurance programs for medical X-ray equipment should be an integral part of the quality culture in health care. However while major hospitals and individual medical centers may implement such programs with some diligence, much X-ray equipment can remain unappraised unless there is a comprehensive regulatory inspection program or some form of compulsion on the equipment owner to implement a testing program. Since the late 1950s all X-ray equipment in the State of Western Australia has been inspected by authorized officers acting on behalf of the Radiological Council, the regulatory authority responsible for administration of the State's Radiation Safety Act. However, economic constraints, coupled with increasing X-ray equipment numbers and a geographically large State have significantly affected the inspection rate. Data available from inspections demonstrate that regular compliance and performance checks are essential in order to ensure proper performance and to minimize unnecessary patient and operator dose. To ensure that diagnostic X-ray equipment complies with accepted standards and performance criteria, the regulatory authority introduced a compulsory compliance testing program for all medical, dental and chiropractic diagnostic X-ray equipment effective from 1 January 1997

  17. A Study of Parallels Between Antarctica South Pole Traverse Equipment and Lunar/Mars Surface Systems

    Science.gov (United States)

    Mueller, Robert P.; Hoffman, Stephen, J.; Thur, Paul

    2010-01-01

    The parallels between an actual Antarctica South Pole re-supply traverse conducted by the National Science Foundation (NSF) Office of Polar Programs in 2009 have been studied with respect to the latest mission architecture concepts being generated by the United States National Aeronautics and Space Administration (NASA) for lunar and Mars surface systems scenarios. The challenges faced by both endeavors are similar since they must both deliver equipment and supplies to support operations in an extreme environment with little margin for error in order to be successful. By carefully and closely monitoring the manifesting and operational support equipment lists which will enable this South Pole traverse, functional areas have been identified. The equipment required to support these functions will be listed with relevant properties such as mass, volume, spare parts and maintenance schedules. This equipment will be compared to space systems currently in use and projected to be required to support equivalent and parallel functions in Lunar and Mars missions in order to provide a level of realistic benchmarking. Space operations have historically required significant amounts of support equipment and tools to operate and maintain the space systems that are the primary focus of the mission. By gaining insight and expertise in Antarctic South Pole traverses, space missions can use the experience gained over the last half century of Antarctic operations in order to design for operations, maintenance, dual use, robustness and safety which will result in a more cost effective, user friendly, and lower risk surface system on the Moon and Mars. It is anticipated that the U.S Antarctic Program (USAP) will also realize benefits for this interaction with NASA in at least two areas: an understanding of how NASA plans and carries out its missions and possible improved efficiency through factors such as weight savings, alternative technologies, or modifications in training and

  18. TA-60-1 Heavy Equipment Shop Areas SWPPP Rev 2 Jan 2017-Final

    Energy Technology Data Exchange (ETDEWEB)

    Burgin, Jillian Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-02-07

    The primary activities and equipment areas at the facility that are potential stormwater pollution sources include; The storage of vehicles and heavy equipment awaiting repair; or repaired vehicles waiting to be picked up; The storage and handling of oils, anti-freeze, solvents, degreasers, batteries and other chemicals for the maintenance of vehicles and heavy equipment; and Equipment cleaning operations including exterior vehicle wash-down. Steam cleaning is only done on the steam cleaning pad area located at the north east end of Building 60-0001.

  19. Shaking table testing of electrical equipment in Argentina

    International Nuclear Information System (INIS)

    Carmona, J.S.; Zabala, F.; Santalucia, J.; Sisterna, C.; Magrini, M.; Oldecop, L.

    1995-01-01

    This paper describes the testing facility, the methodology applied and the results obtained in the seismic qualification tests of different types of electric equipment. These tests were carried out on a shaking table that was developed and built at the Earthquake Research Institute of the National University of San Juan, Argentine. The equipment tested consist of 500 KV and 132 KV current transformers, a 500 KV voltage transformer, a 145 KV disconnecter and a relay cabinet. The acceleration response of the tested equipment was measured at several locations distributed along its height, and strains were measured at critical points by strain gauges cemented on the base of the porcelain insulator. All the information was recorded with a data acquisition system at a sampling rate of 200 times per second in each channel. The facility developed at this Institute is the largest one in operation in Argentina at present and the equipment tested is the highest, heaviest and more slender one which has been seismically qualified on a shaking table in this country. These tests have been a valuable experience in the field of structural dynamic testing applied to equipment of hydroelectric and nuclear power plants. (author)

  20. The LHC's equipment all in step

    CERN Multimedia

    2005-01-01

    Over 80% of the control equipment for the LHC will be connected by a special communication network known as WorldFIP, which has been chosen for its very precise timing, excellent operating performance and robustness in difficult environments. Over 350 kilometres of this network are currently being installed in the LHC tunnel and checked for compliance with the required standards.

  1. Gamma scanning equipment for nuclear safeguards

    International Nuclear Information System (INIS)

    De Grandi, G.; Stanchi, L.

    1975-01-01

    Many reasons justify the use of gamma techniques in the field of nuclear safeguards. The paper describes electronic equipment for gamma-scanning of non-irradiated fuel elements. The control of the operation is completely digital and driven by a minicomputer and gives more accurate results in respect of an analog chain which has been successfully used in fuel element manufacturing plants

  2. 14 CFR 31.85 - Required basic equipment.

    Science.gov (United States)

    2010-01-01

    ... following equipment is required: (a) For all balloons: (1) [Reserved] (2) An altimeter. (3) A rate of climb indicator. (b) For hot air balloons: (1) A fuel quantity gauge. If fuel cells are used, means must be... AIRWORTHINESS STANDARDS: MANNED FREE BALLOONS Operating Limitations and Information § 31.85 Required basic...

  3. 30 CFR 18.81 - Field modification of approved (permissible) equipment; application for approval of modification...

    Science.gov (United States)

    2010-07-01

    ... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES... having jurisdiction at the mine where such equipment is to be operated stating the modifications which...

  4. Interventional suite and equipment management: cradle to grave

    Energy Technology Data Exchange (ETDEWEB)

    Strauss, Keith J. [Harvard Medical School, Radiology Physics and Engineering, Children' s Hospital Boston, Boston, MA (United States)

    2006-09-15

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  5. Interventional suite and equipment management: cradle to grave

    International Nuclear Information System (INIS)

    Strauss, Keith J.

    2006-01-01

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  6. Remote Operation and Maintenance Demonstration Facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock-up various hot-cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and the other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups. 6 figures

  7. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  8. New control system: the commands of the settings equipments

    International Nuclear Information System (INIS)

    David, L.; Maugeais, C.

    1992-01-01

    The equipments allowing the setting of the GANIL beam (motors, probes, supplies...) may be operated by three distinct ways: by dial (pseudo potentiometer), by menu or by slider. These processes are described. (A.B.)

  9. Portable bench tester for piezo weigh-in-motion equipment : executive summary report.

    Science.gov (United States)

    2006-06-01

    The Ohio Department of Transportation's (ODOT) piezo weigh-in-motion (WIM) equipment must be tested for initial working operation and to insure continued correct operation. Currently, the only available method to verify the vehicle classification par...

  10. Development of equipment for fabricating DUPIC fuel powder

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Yang, M. S.; Park, J. J.; Lee, J. W.; Kim, J. H.; Cho, K. H.; Lee, D. Y.; Lee, Y. S.; Na, S. H.

    1999-06-01

    The powder fabrication processes, as the first stage of manufacturing DUPIC (Direct Use of PWR spent fuel In CANDU) fuel, consist of the slitting of spent PWR fuel rods, REOX (Oxidation and REduction of Oxide Fuels) processing to produce the powder feedstock, the milling of the produced powder, the granulation of the milled powder, and the mixing of the granulated powder with pressing lubricants. All these processes should be conducted by remote means in a hot-cell environment where the direct human access is limited to the strictest minimum due to the high radioactivity. This report describe the development of the equipment for fabricating DUPIC fuel powder. These equipment are Slitting Machine, Oxidation and Reduction (OREOX) Furnace, Mill, Roll Compactor, and Mixer. Remote design concept was applied to all the equipment for use in the M6 hot-cell of the IMEF. Mechanical design considerations and capabilities of the equipment for remote operation and maintenance are presented. First prototypes were developed and installed in the DUPIC full scale mock-up and tested using a master-slave manipulator. Redesign and reconstruction were made on each equipment based on mock-up test results. The remote technology acquired through this research was utilized in developing other equipment for DUPIC fuel fabrication, thereby improving safety and increasing productivity. This technology could also be extended to the area of remote handling equipment development for use in hazardous environments. (author). 14 refs., 9 tabs., 21 figs

  11. Development of equipment for fabricating DUPIC fuel powder

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ki Ho; Yang, M. S.; Park, J. J.; Lee, J. W.; Kim, J. H.; Cho, K. H.; Lee, D. Y.; Lee, Y. S.; Na, S. H

    1999-06-01

    The powder fabrication processes, as the first stage of manufacturing DUPIC (Direct Use of PWR spent fuel In CANDU) fuel, consist of the slitting of spent PWR fuel rods, REOX (Oxidation and REduction of Oxide Fuels) processing to produce the powder feedstock, the milling of the produced powder, the granulation of the milled powder, and the mixing of the granulated powder with pressing lubricants. All these processes should be conducted by remote means in a hot-cell environment where the direct human access is limited to the strictest minimum due to the high radioactivity. This report describe the development of the equipment for fabricating DUPIC fuel powder. These equipment are Slitting Machine, Oxidation and Reduction (OREOX) Furnace, Mill, Roll Compactor, and Mixer. Remote design concept was applied to all the equipment for use in the M6 hot-cell of the IMEF. Mechanical design considerations and capabilities of the equipment for remote operation and maintenance are presented. First prototypes were developed and installed in the DUPIC full scale mock-up and tested using a master-slave manipulator. Redesign and reconstruction were made on each equipment based on mock-up test results. The remote technology acquired through this research was utilized in developing other equipment for DUPIC fuel fabrication, thereby improving safety and increasing productivity. This technology could also be extended to the area of remote handling equipment development for use in hazardous environments. (author). 14 refs., 9 tabs., 21 figs.

  12. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  13. Queuing theory models used for port equipment sizing

    Science.gov (United States)

    Dragu, V.; Dinu, O.; Ruscă, A.; Burciu, Ş.; Roman, E. A.

    2017-08-01

    The significant growth of volumes and distances on road transportation led to the necessity of finding solutions to increase water transportation market share together with the handling and transfer technologies within its terminals. It is widely known that the biggest times are consumed within the transport terminals (loading/unloading/transfer) and so the necessity of constantly developing handling techniques and technologies in concordance with the goods flows size so that the total waiting time of ships within ports is reduced. Port development should be achieved by harmonizing the contradictory interests of port administration and users. Port administrators aim profit increase opposite to users that want savings by increasing consumers’ surplus. The difficulty consists in the fact that the transport demand - supply equilibrium must be realised at costs and goods quantities transiting the port in order to satisfy the interests of both parties involved. This paper presents a port equipment sizing model by using queueing theory so that the sum of costs for ships waiting operations and equipment usage would be minimum. Ship operation within the port is assimilated to a mass service waiting system in which parameters are later used to determine the main costs for ships and port equipment.

  14. Equipment to weld fuel rods of mixed oxides

    International Nuclear Information System (INIS)

    Aparicio, G.; Orlando, O.S.; Olano, V.R.; Toubes, B.; Munoz, C.A.

    1987-01-01

    Two welding outfits system T1G were designed and constructed to weld fuel rods with mixed oxides pellets (uranium and plutonium). One of them is connected to a glove box where the loading of sheaths takes place. The sheaths are driven to the welder through a removable plug pusher in the welding chamber. This equipment was designed to perform welding tests changing the parameters (gas composition and pressure, welding current, electrode position, etc.). The components of the welder, such as plug holder, chamber closure and peripheral accessories, were designed and constructed taking into account the working pressures in the machine, which is placed in a controlled area and connected to a glove box, where special safety conditions are necessary. The equipment to weld fuel bars is complemented by another machine, located in cold area, of the type presently used in the fuel elements factory. This equipment has been designed to perform some welding operations in sheaths and mixed oxide rods of the type Atucha I and II. Both machines have a programmed power supply of wide range and a vacuum, and pressurizing system that allows the change of parameters. Both systems have special features of handling and operation. (Author)

  15. Development of remote automatic equipment for BWR power plants

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi

    1984-01-01

    The development of remote control, automatic equipment for nuclear power stations has been promoted to raise the rate of operation of plants by shortening regular inspection period, to improve the safety and reliability of inspection and maintenance works by mechanization, to reduce the radiation exposure dose of workers and to reduce the manpower required for works. The taking-off of control rod drives from reactors and fixing again have been mechanized, but the disassembling, cleaning, inspection and assembling of control rod drives are manually carried out. Therefore, Hitachi Ltd. has exerted effort to develop the automatic equipment for this purpose. The target of development, investigation, the construction and function of the equipment, the performance and the effect of adopting it are reported. The equipment for the volume reduction of spent fuel channel boxes and spent control rods is developed since these are major high level radioactive solid wastes, and their apparent volume is large. Also the target of development, investigated things, the construction and function of the equipment, the performance and the effect of adopting it are reported. (Kako, I.)

  16. Development and characterization of micro-pattern gas detectors for intense beams of hadrons

    Energy Technology Data Exchange (ETDEWEB)

    Vandenbroucke, Maxence

    2012-07-02

    This thesis work is dedicated to the design, development and characterization of Micro-Pattern Gas Detectors. The performances of a Time Projection Chamber (TPC) equipped with a triple Gas Electron Multiplier (GEM) amplification structure are reported. The intrinsic ion backflow suppression of GEM foils drastically reduces the space charge produced by wire readout in traditional TPC. The GEM solution allows the operation of a TPC at much higher event rate. The second part of this thesis describes the development of a 40 x 40 cm{sup 2} Micromegas detector with a highly segmented central area. A reduction of discharges compared to conventional Micromegas detectors is needed for stable operation in intense beams of hadrons. Spark reduction technologies have been successfully studied and results are presented.

  17. Development and characterization of micro-pattern gas detectors for intense beams of hadrons

    International Nuclear Information System (INIS)

    Vandenbroucke, Maxence

    2012-01-01

    This thesis work is dedicated to the design, development and characterization of Micro-Pattern Gas Detectors. The performances of a Time Projection Chamber (TPC) equipped with a triple Gas Electron Multiplier (GEM) amplification structure are reported. The intrinsic ion backflow suppression of GEM foils drastically reduces the space charge produced by wire readout in traditional TPC. The GEM solution allows the operation of a TPC at much higher event rate. The second part of this thesis describes the development of a 40 x 40 cm 2 Micromegas detector with a highly segmented central area. A reduction of discharges compared to conventional Micromegas detectors is needed for stable operation in intense beams of hadrons. Spark reduction technologies have been successfully studied and results are presented.

  18. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  19. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M; Anderson, D P [Spectro Incorporated, Littleton, Massachusetts (United States)

    1998-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  20. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M.; Anderson, D.P. [Spectro Incorporated, Littleton, Massachusetts (United States)

    1997-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)