  1. Surface Environmental Surveillance Procedures Manual

    International Nuclear Information System (INIS)

    Hanf, Robert W.; Poston, Ted M.

    2000-01-01

    Shows and explains certain procedures needed for surface environmental surveillance. Hanford Site environmental surveillance is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) under the Surface Environmental Surveillance Project (SESP). The basic requirements for site surveillance are set fourth in DOE Order 5400.1, General Environmental Protection Program Requirements. Guidance for the SESP is provided in DOE Order 5484.1, Environmental Protection, Safety, and Health Protection Information Reporting Requirements and DOE Order 5400.5, Radiation Protection of the Public and Environment. Guidelines for environmental surveillance activities are provided in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. An environmental monitoring plan for the Hanford Site is outlined in DOE/RL 91-50 Rev. 2, Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual. Personnel training requirements are documented in SESP-TP-01 Rev.2, Surface Environmental Surveillance Project Training Program.

  2. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  3. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  4. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  5. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out

  6. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  7. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  8. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  9. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  10. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  11. Surveillance of the environmental radioactivity

    International Nuclear Information System (INIS)

    Schneider, Th.; Gitzinger, C.; Jaunet, P.; Eberbach, F.; Clavel, B.; Hemidy, P.Y.; Perrier, G.; Kiper, Ch.; Peres, J.M.; Josset, M.; Calvez, M.; Leclerc, M.; Leclerc, E.; Aubert, C.; Levelut, M.N.; Debayle, Ch.; Mayer, St.; Renaud, Ph.; Leprieur, F.; Petitfrere, M.; Catelinois, O.; Monfort, M.; Baron, Y.; Target, A.

    2008-01-01

    The objective of these days was to present the organisation of the surveillance of the environmental radioactivity and to allow an experience sharing and a dialog on this subject between the different actors of the radiation protection in france. The different presentations were as follow: evolution and stakes of the surveillance of radioactivity in environment; the part of the European commission, regulatory aspects; the implementation of the surveillance: the case of Germany; Strategy and logic of environmental surveillance around the EDF national centers of energy production; environmental surveillance: F.B.F.C. site of Romans on Isere; steps of the implementation 'analysis for release decree at the F.B.F.C./C.E.R.C.A. laboratory of Romans; I.R.S.N. and the environmental surveillance: situation and perspectives; the part of a non institutional actor, the citizenship surveillance done by A.C.R.O.; harmonization of sampling methods: the results of inter operators G.T. sampling; sustainable observatory of environment: data traceability and samples conservation; inter laboratories tests of radioactivity measurements; national network of environmental radioactivity measurement: laboratories agreements; the networks of environmental radioactivity telemetry: modernization positioning; programme of observation and surveillance of surface environment and installations of the H.A.-M.A.V.L. project (high activity and long life medium activity); Evolution of radionuclides concentration in environment and adaptation of measurements techniques to the surveillance needs; the national network of radioactivity measurement in environment; modes of data restoration of surveillance: the results of the Loire environment pilot action; method of sanitary impacts estimation in the area of ionizing radiations; the radiological impact of atmospheric nuclear tests in French Polynesia; validation of models by the measure; network of measurement and alert management of the atmospheric

  12. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  13. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  14. Surface Environmental Surveillance Project: Locations Manual Volume 1 – Air and Water Volume 2 – Farm Products, Soil & Vegetation, and Wildlife

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, Brad G.; Patton, Gregory W.; Stegen, Amanda; Poston, Ted M.

    2009-01-01

    This report describes all environmental monitoring locations associated with the Surface Environmental Surveillance Project. Environmental surveillance of the Hanford site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The environmental surveillance sampling design is described in the Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operation Office (DOE/RL-91-50). This document contains the locations of sites used to collect samples for the Surface Environmental Surveillance Project (SESP). Each section includes directions, maps, and pictures of the locations. A general knowledge of roads and highways on and around the Hanford Site is necessary to successfully use this manual. Supplemental information (Maps, Gazetteer, etc.) may be necessary if user is unfamiliar with local routes. The SESP is a multimedia environmental surveillance effort to measure the concentrations of radionuclides and chemicals in environmental media to demonstrate compliance with applicable environmental quality standards and public exposure limits, and assessing environmental impacts. Project personnel annually collect selected samples of ambient air, surface water, agricultural products, fish, wildlife, and sediments. Soil and vegetation samples are collected approximately every 5 years. Analytical capabilities include the measurement of radionuclides at very low environmental concentrations and, in selected media, nonradiological chemicals including metals, anions, volatile organic compounds, and total organic carbon.

  15. Hanford Site surface environmental surveillance

    International Nuclear Information System (INIS)

    Dirkes, R.L.

    1998-01-01

    Environmental surveillance of the Hanford Site and the surrounding region is conducted to demonstrate compliance with environmental regulations, confirm adherence to US Department of Energy (DOE) environmental protection policies, support DOE environmental management decisions, and provide information to the public. The Surface Environmental Surveillance Project (SESP) is a multimedia environmental monitoring program conducted to measure the concentrations of radionuclides and chemical contaminants in the environment and assess the integrated effects of these contaminants on the environment and the public. The monitoring program includes sampling air, surface water, sediments, soil, natural vegetation, agricultural products, fish, and wildlife. Functional elements inherent in the operation of the SESP include project management, quality assurance/control, training, records management, environmental sampling network design and implementation, sample collection, sample analysis, data management, data review and evaluation, exposure assessment, and reporting. The SESP focuses on those contaminant/media combinations calculated to have the highest potential for contributing to off-site exposure. Results of the SESP indicate that contaminant concentrations in the Hanford environs are very low, generally below environmental standards, at or below analytical detection levels, and indicative of environmental levels. However, areas of elevated contaminant concentrations have been identified at Hanford. The extent of these areas is generally limited to past operating areas and waste disposal sites

  16. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  17. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  18. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  19. Surface Environmental Surveillance Procedures Manual, PNL-MA-580, Rev. 5

    Energy Technology Data Exchange (ETDEWEB)

    Hanf, Robert W.; Poston, Ted M.; Bisping, Lynn E.

    2007-07-01

    This manual contains the procedures that are used for the collection of routine Surface Environmental Surveillance Project environmental samples and field measurements on and around the Hanford Site. Specific responsibilities for project personnel are also defined.

  20. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2005-01-19

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This document contains the calendar year 2005 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project.

  1. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    International Nuclear Information System (INIS)

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  2. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  3. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  4. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2008-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, "Environmental Protection Program," and DOE Order 5400.5, "Radiation Protection of the Public and the Environment." The environmental surveillance sampling design is described in the "Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office." This document contains the calendar year 2008 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2008, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2008.

  5. Hanford Site Environmental Surveillance Data Report for Calendar Year 2002

    International Nuclear Information System (INIS)

    Bisping, Lynn E.

    2003-01-01

    This data report contains the actual raw data used in the annual Hanford Site environmental report (PNNL--14295). In addition to providing raw data collected during routine sampling in 2002, this report also includes data from special sampling studies performed by PNNL during 2002. Environmental surveillance at the Hanford Site, located in southeastern Washington State, is conducted by Pacific Northwest National Laboratory (PNNL), which is operated by Battelle for the U.S. Department of Energy. The data collected provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River water and sediment. For more information regarding the 2002 sampling schedule for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project, refer to L. E. Bisping, Environmental Surveillance Master Sampling Schedule (PNNL--13418, Pacific Northwest National Laboratory, Richland, Washington). PNNL publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 2002 describes the site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. Sections of the annual environmental report include tables and summaries of offsite and onsite environmental surveillance data collected by PNNL during 2002. This data report contains the actual raw data used to create those tables and summaries. In addition to providing raw data collected during routine sampling efforts in 2002, this data report also includes data from special sampling studies performed by PNNL during 2002

  6. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  7. Master schedule for CY-1979 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1978-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site, as conducted by the Environmental Evaluation Section of Battelle, Pacific Northwest Laboratory for the Department of Energy (DOE), is given. Modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, and to monitor Hanford operations for compliance with applicable environmental criteria and Washington State Water Quality Standards. Air quality data are obtained in a separate program administered by the Hanford Environmental Health Foundation. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Water quality data for Hanford Site potable water systems are published each year by the Hanford Environmental Health Foundation. The data collected are available in routine reports issued by the Environmental Evaluations staff. Groundwater data and evaluation are reported in the series, ''Radiological Status of the Groundwater Beneath the Hanford Project for...,'' the latest issue being PNL-2624 for CY-1977. Data from locations within the plant boundaries are presented in the annual ''Environmental Status of the Hanford Site for...'' report series, the most recent report being PNL-2677 for 1977. Data from offsite locations are presented in the annual ''Environmental Surveillance at Hanford for...'' series of reports, the latest being PNL-2614 for 1977

  8. Standard protocol for conducting pre-operational environmental surveillance around nuclear facilities

    International Nuclear Information System (INIS)

    Hegde, A.G.; Verma, P.C.; Rajan, M.P.

    2009-02-01

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for conducting pre-operational environmental surveillance around nuclear facilities. Such surveillances have been proposed to be carried out by university professionals under DAE-BRNS projects. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  9. Standard protocol for conducting pre-operational environmental surveillance around nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hegde, A G; Verma, P C; Rajan, M P [Health Safety and Environment Group, Bhabha Atomic Research Centre, Mumbai (India)

    2009-02-15

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for conducting pre-operational environmental surveillance around nuclear facilities. Such surveillances have been proposed to be carried out by university professionals under DAE-BRNS projects. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  10. Laboratory of environmental radiological surveillance

    International Nuclear Information System (INIS)

    Mendez G, A.; Marcial M, F.; Giber F, J.; Montiel R, E.; Leon del V, E.; Rivas C, I.; Leon G, M.V.; Lagunas G, E.; Aragon S, R.; Juarez N, A.; Alfaro L, M.M.

    1991-12-01

    The department of radiological protection of the ININ requests the collaboration of the Engineering Unit for the elaboration of the work project of the laboratory of environmental radiological surveillance. The emission of radioactive substances to the atmosphere like consequence of the normal operation of the Nuclear Center, constitutes an exhibition source from the man to the radiations that it should be appropriately watched over and controlled to be able to determine the population's potential exhibition that it lives in the area of influence of the installation. (Author)

  11. Surface Environmental Surveillance Procedures Manual

    Energy Technology Data Exchange (ETDEWEB)

    RW Hanf; TM Poston

    2000-09-20

    Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual.

  12. Environmental and ground-water surveillance at Hanford

    Energy Technology Data Exchange (ETDEWEB)

    Dirkes, R.L.; Luttrell, S.P.

    1995-06-01

    Environmental and ground-water surveillance of the Hanford Site and surrounding region is conducted to demonstrate compliance with environmental regulations, confirm adherence to DOE environmental protection policies, support DOE environmental management decisions, and provide information to the public. Environmental surveillance encompasses sampling and analyzing for potential radiological and nonradiological chemical contaminants on and off the Hanford Site. Emphasis is placed on surveillance of exposure pathways and chemical constituents that pose the greatest risk to human health and the environment.

  13. Environmental and ground-water surveillance at Hanford

    International Nuclear Information System (INIS)

    Dirkes, R.L.; Luttrell, S.P.

    1995-01-01

    Environmental and ground-water surveillance of the Hanford Site and surrounding region is conducted to demonstrate compliance with environmental regulations, confirm adherence to DOE environmental protection policies, support DOE environmental management decisions, and provide information to the public. Environmental surveillance encompasses sampling and analyzing for potential radiological and nonradiological chemical contaminants on and off the Hanford Site. Emphasis is placed on surveillance of exposure pathways and chemical constituents that pose the greatest risk to human health and the environment

  14. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2010-01-08

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford Site environs per regulatory requirements. This document contains the calendar year 2010 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2010, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2010.

  15. Public involvement in environmental surveillance at Hanford

    International Nuclear Information System (INIS)

    Hanf, R.W. Jr.; Patton, G.W.; Woodruff, R.K.; Poston, T.M.

    1994-08-01

    Environmental surveillance at the Hanford Site began during the mid-1940s following the construction and start-up of the nation's first plutonium production reactor. Over the past approximately 45 years, surveillance operations on and off the Site have continued, with virtually all sampling being conducted by Hanford Site workers. Recently, the US Department of Energy Richland Operations Office directed that public involvement in Hanford environmental surveillance operations be initiated. Accordingly, three special radiological air monitoring stations were constructed offsite, near hanford's perimeter. Each station is managed and operated by two local school teaches. These three stations are the beginning of a community-operated environmental surveillance program that will ultimately involve the public in most surveillance operations around the Site. The program was designed to stimulate interest in Hanford environmental surveillance operations, and to help the public better understand surveillance results. The program has also been used to enhance educational opportunities at local schools

  16. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2009-01-20

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1 and DOE Order 5400.5. This document contains the calendar year 2009 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2009, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2009.

  17. Elements of quality assurance in environmental surveillance

    International Nuclear Information System (INIS)

    Johnson, L.J.

    1975-01-01

    Qualities of an environmental surveillance program requiring control or assurance are reviewed. Requirements of accuracy, reproducibility, sensitivity, acceptability, and time and cost effectiveness are qualities discussed. The controls applicable to sample collection, handling, chemical analysis, measurement and data presentation are identified and discussed as they pertain to environmental monitoring. Quality assurance program recommendations for developing and reporting environmental surveillance data are provided

  18. Environmental health surveillance system; Kankyo hoken surveillance system

    Energy Technology Data Exchange (ETDEWEB)

    Ono, M. [National Inst. for Environmental Studies, Tsukuba (Japan)

    1998-02-01

    The Central Environmental Pollution Prevention Council pointed out the necessity to establish an environmental health surveillance system (hereinafter referred to as System) in its report `on the first type district specified by the Environmental Pollution Caused Health Damages Compensation Act,` issued in 1986. A study team, established in Environment Agency, has been discussing to establish System since 1986. This paper outlines System, and some of the pilot surveillance results. It is not aimed at elucidation of the cause-effect relationships between health and air pollution but at discovery of problems, in which the above relationships in a district population are monitored periodically and continuously from long-term and prospective viewpoints, in order to help take necessary measures in the early stage. System is now collecting the data of the chronic obstructive lung diseases on a nation-wide scale through health examinations of 3-year-old and preschool children and daily air pollution monitoring. 6 refs., 3 figs., 1 tab.

  19. Surveillance of environmental radiation in Finland. Annual Report 2004

    International Nuclear Information System (INIS)

    Mustonen, R.

    2005-07-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of levels of artificial radiation in the environment to which the public is exposed. Another goal is to detect all remarkable changes in levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of health of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radiation contains surveillance of artificial radiation and artificial radioactive elements in the environment. Natural radiation and natural radioactive elements are not associated with the surveillance programme, although the greater part of the public exposure to radiation is caused by natural radiation. Exposure to natural radiation is controlled separately if there is reason to suspect that natural radioactive elements cause unusual high exposure to the public (e.g. indoor radon and natural radionuclides in drinking water). Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on the national and the European Communities' legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, also the Finnish Meteorological Institute (FMI) and the Defence Forces are monitoring environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2004. The report also contains some comparisons with results from the

  20. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2011-01-21

    This document contains the calendar year 2011 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2011, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2011.

  1. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  2. Surveillance of environmental radiation in Finland. Annual Report 2001

    International Nuclear Information System (INIS)

    Mustonen, R.

    2002-01-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of levels of radiation to which the public is exposed. Another goal is to detect all remarkable changes in levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of health of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on the national and the European Communities' legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, also the Finnish Meteorological Institute (FMI) and the Defence Forces are monitoring environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2001. The report also contains some comparisons with results from the previous years. The results are collected from monitoring programmes of STUK, FMI and the Defence Forces Research Institute of Technology. Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. Those results are reported elsewhere. STUK's partners in surveillance of environmental radioactivity are collecting and delivering environmental samples for laboratory analyses, or are participating in whole-body counting. STUK would like to express its gratitude to the following institutions for the successful co-operation: Defence

  3. Community-Operated Environmental Surveillance Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described.

  4. Community-Operated Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described

  5. Surveillance of environmental radiation in Finland. Annual Report 2000

    International Nuclear Information System (INIS)

    Mustonen, R.

    2001-01-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of levels of radiation to which the public is exposed. Another goal is to detect all remarkable changes in levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of the health of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on the national and the European Communities' legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, also the Finnish Meteorological Institute (FMI) and the Defence Forces are monitoring environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2000. The report also contains some comparisons with results from the previous years. The results are collected from monitoring programmes of STUK, FMI and the Defence Forces Research Institute of Technology. Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. Those results are reported elsewhere. STUK's partners in surveillance of environmental radioactivity are collecting and delivering samples for laboratory analyses, or are participating in whole-body counting. STUK would like to express its gratitude to the following institutions for the successful co-operation: Defence Forces

  6. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  7. Surveillance of environmental radiation in Finland. Annual Report 2002

    International Nuclear Information System (INIS)

    Mustonen, R.

    2003-01-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of the levels of radiation to which the public is exposed. Another goal is to detect all remarkable changes in the levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on a continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on both national and EU legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for the surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, the Finnish Meteorological Institute (FMI) and the Defence Forces also monitor environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2002. The report also contains some comparisons with results from the previous years. The results are obtained from the monitoring programmes of STUK, FMI and the Defence Forces Research Institute of Technology. Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. These results are reported elsewhere. STUK's partners in the surveillance of environmental radioactivity collect and deliver environmental samples for laboratory analyses, or participate in whole-body counting. STUK would like to express its gratitude to the following institutions for successful co-operation: The Finnish Defence Forces, the Finnish

  8. Surveillance of environmental radiation in Finland. Annual Report 2003

    International Nuclear Information System (INIS)

    Mustonen, R.

    2004-01-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of the levels of radiation to which the public is exposed. Another goal is to detect all remarkable changes in the levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on a continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on both national and EU legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for the surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, the Finnish Meteorological Institute (FMI) and the Defence Forces also monitor environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2003. The report also contains some comparisons with results from the previous years. The results are obtained from the monitoring programmes of STUK, FMI and the Defence Forces Research Institute of Technology. Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. These results are reported elsewhere. STUK's partners in the surveillance of environmental radioactivity collect and deliver environmental samples for laboratory analyses, or participate in whole-body counting. STUK would like to express its gratitude to the following institutions for successful co- operation: The Finnish Defence Forces, the Finnish

  9. Neural nets for the plausibility check of measured values in the integrated measurement and information system for the surveillance of environmental radioactivity (IMIS)

    International Nuclear Information System (INIS)

    Haase, G.

    2003-01-01

    Neural nets to the plausibility check of measured values in the ''integrated measurement and information system for the surveillance of environmental radioactivity, IMIS'' is a research project supported by the Federal Minister for the Environment, Nature Conservation and Nuclear Safety. A goal of this project was the automatic recognition of implausible measured values in the data base ORACLE, which measured values from surveillance of environmental radioactivity of most diverse environmental media contained. The conversion of this project [ 1 ] was realized by institut of logic, complexity and deduction systems of the university Karlsruhe under the direction of Professor Dr. Menzel, Dr. Martin Riedmueller and Martin Lauer. (orig.)

  10. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  13. Laboratory of environmental radiological surveillance; Laboratorio de vigilancia radiologica ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Mendez G, A; Marcial M, F; Giber F, J; Montiel R, E; Leon del V, E; Rivas C, I; Leon G, M V; Lagunas G, E; Aragon S, R; Juarez N, A; Alfaro L, M M

    1991-12-15

    The department of radiological protection of the ININ requests the collaboration of the Engineering Unit for the elaboration of the work project of the laboratory of environmental radiological surveillance. The emission of radioactive substances to the atmosphere like consequence of the normal operation of the Nuclear Center, constitutes an exhibition source from the man to the radiations that it should be appropriately watched over and controlled to be able to determine the population's potential exhibition that it lives in the area of influence of the installation. (Author)

  14. Master schedule for CY-1981 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1980-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is provided. Questions about specific entries should be referred to the authors since modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Air quality data obtained in a separate program are also reported. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Schedules are presented for the following subjects: air, Columbia River, sanitary water, surface water, ground water, foodstuffs, wildlife, soil and vegetation, external radiation measurement, portable instrument surveys, and surveillance of waste disposal sites

  15. Laboratory of environmental radiological surveillance; Laboratorio de vigilancia radiologica ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Mendez G, A.; Marcial M, F.; Giber F, J.; Montiel R, E.; Leon del V, E.; Rivas C, I.; Leon G, M.V.; Lagunas G, E.; Aragon S, R.; Juarez N, A.; Alfaro L, M.M

    1991-12-15

    The department of radiological protection of the ININ requests the collaboration of the Engineering Unit for the elaboration of the work project of the laboratory of environmental radiological surveillance. The emission of radioactive substances to the atmosphere like consequence of the normal operation of the Nuclear Center, constitutes an exhibition source from the man to the radiations that it should be appropriately watched over and controlled to be able to determine the population's potential exhibition that it lives in the area of influence of the installation. (Author)

  16. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  17. Surveillance of environmental radiation in Finland. Annual report 2011; Ympaeristoen saeteilyvalvonta Suomessa. Vuosiraportti 2011

    Energy Technology Data Exchange (ETDEWEB)

    Mustonen, R. (ed.)

    2012-08-15

    The main goal of the surveillance of environmental radioactivity is to be always aware of levels of artificial radiation in the environment to which the public is exposed. Another goal is to detect all remarkable changes in levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of health of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. This report summarises the results of environmental radiation surveillance in 2011. The report also contains some comparisons with results from the previous years. Surveillance of environmental radiation contains surveillance of artificial radiation and artificial radioactive elements in the environment. Natural radiation and natural radioactive elements are not associated with the surveillance programme, although the greater part of the public exposure to radiation is caused by natural radiation. Exposure to natural radiation is controlled separately if there is reason to suspect, that natural radioactive elements cause unusual high exposure to the public (e.g. indoor radon and natural radionuclides in drinking water). Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. Those results are reported elsewhere. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on the national and the European Communities' legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air

  18. Guide for environmental radiological surveillance at ERDA installations

    International Nuclear Information System (INIS)

    Corley, J.P.; Denham, D.H.; Michels, D.E.; Olsen, A.R.; Waite, D.A.

    1977-03-01

    This Guide is intended to: Provide recommended methods, procedures, and performance criteria to bring greater comparability to ERDA environmental monitoring and reporting systems; provide ERDA management, particularly the Headquarters' Division of Safety, Standards, and Compliance (SSC) and field offices, with a broad review of accepted radiological surveillance practices for use in the evaluation of environmental surveillance programs at ERDA facilities; and delineate the capabilities and limitations of the various environmental monitoring systems for radioactivity currently used at ERDA sites, including technical areas where there is either an inadequate basis for procedural selection or where further developmental work may be warranted. The discussion of equipment, measurement techniques, and quality control procedures, although believed to represent current technology, is subject to continuing change as technological improvements become available

  19. Master schedule for CY-1980 Hanford Environmental Surveillance Routine Program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1979-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is presented. The enviromental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Data are reported on the following topics: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurement; portable instrument surveys; and surveillance of waste disposal sites;

  20. Environmental surveillance at Hanford for CY-1975 data

    International Nuclear Information System (INIS)

    Blumer, P.J.; Fix, J.J.; Speer, D.R.

    1976-04-01

    This document contains detailed data collected by the Hanford Environmental Surveillance program during 1975. Environmental Surveillance responsibilities at Hanford are divided between Hanford Environmental Health Foundation (HEHF) and Battelle-Northwest (BNW). HEHF is responsible for measuring all nonradiological air quality and sanitary water parameters of interest. BNW is responsible for measuring radiological parameters in all environmental media of significance and for measuring both radiological and nonradiological parameters of Columbia River water and ground water. A brief description of the method and location of sample collection during 1975 is included. Data are tabulated on the content of specific radionuclides in surface air. Columbia River water, drinking water, ground water, foods, fish, and wild animals. Data are also included on content of NO 2 and SO 2 in air, nitrates in Columbia River water, ground water, and drinking water, and water quality of samples of Columbia River water collected at various sampling locations

  1. Regulatory standards applicable or relevant to the independent Hanford environmental surveillance and oversight program

    International Nuclear Information System (INIS)

    King, S.E.; Hendrickson, P.L.; Siegel, M.R.; Woodruff, M.G.; Belfiglio, J.; Elliott, R.W.

    1990-03-01

    The authors reviewed federal and state statutes and regulations, as well as Department of Energy (DOE) orders and other guidance material, for potential applicability to the environmental surveillance program conducted for the Hanford site by the Pacific Northwest Laboratory (PNL). There are no federal or state statutes or regulations which are directly applicable to the environmental surveillance program. However, other regulatory schemes, while not directly applicable to the environmental surveillance program, are important insofar as they are indicative of regulatory concern and direction. Because of the evolving nature of environmental regulations, this area needs to be closely monitored for future impact on environmental surveillance activities. 9 refs.,

  2. Environmental Surveillance System To Track Wild Poliovirus Transmission

    Science.gov (United States)

    Deshpande, Jagadish M.; Shetty, Sushmitha J.; Siddiqui, Zaeem A.

    2003-01-01

    Eradication of poliomyelitis from large metropolis cities in India has been difficult due to high population density and the presence of large urban slums. Three paralytic poliomyelitis cases were reported in Mumbai, India, in 1999 and 2000 in spite of high immunization coverage and good-quality supplementary immunization activities. We therefore established a systematic environmental surveillance study by weekly screening of sewage samples from three high-risk slum areas to detect the silent transmission of wild poliovirus. In 2001, from among the 137 sewage samples tested, wild poliovirus type 1 was isolated from 35 and wild poliovirus type 3 was isolated from 1. Acute flaccid paralysis (AFP) surveillance indicated one case of paralytic poliomyelitis from the city. Phylogenetic analysis with complete VP1 sequences revealed that the isolates from environmental samples belonged to four lineages of wild polioviruses recently isolated from poliomyelitis cases in Uttar Pradesh and not to those previously isolated from AFP cases in Mumbai. Wild poliovirus thus introduced caused one case of paralytic poliomyelitis. The virus was detected in environmental samples 3 months before. It was found that wild polioviruses introduced several times during the year circulated in Mumbai for a limited period before being eliminated. Environmental surveillance was found to be sensitive for the detection of wild poliovirus silent transmission. Nucleotide sequence analysis helped identify wild poliovirus reservoir areas. PMID:12732567

  3. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  4. Environmental monitoring and surveillance on the Oak Ridge Reservation: 1993 Data

    International Nuclear Information System (INIS)

    Koncinski, W.S.

    1994-12-01

    Environmental monitoring and surveillance are conducted on the Oak Ridge Reservation and its environs throughout the year. Environmental monitoring ensures that (1) the reservation is a safe place to work, (2) activities on the reservation do not adversely affect the neighboring communities, and (3) compliance is made with federal and state regulations. This document is a compilation of the monitoring and surveillance data for calendar year 1993. It is a tool for analysts in the fields of environmental monitoring and environmental restoration. The summary information found in the annual site environmental report was drawn from the contents of summary in this document

  5. Environmental surveillance at Los Alamos during 2005

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-09-30

    Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (LANL or the Laboratory) environmental organization, as required by US Department of Energy Order 5400.1, General Environmental Protection Program, and US Department of Energy Order 231.IA, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory's efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory's major environmental programs. Chapter 2 reports the Laboratory's compliance status for 2005. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations. The environmental surveillance and monitoring data are organized by environmental media (Chapter 4, Air; Chapters 5 and 6, Water and Sediments; Chapter 7, Soils; and Chapter 8, Foodstuffs and Biota) in a format to meet the needs of a general and scientific audience. Chapter 9, new for this year, provides a summary of the status of environmental restoration work around LANL. A glossary and a list ofacronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the Laboratory's technical areas and their associated programs, and Appendix D provides web links to more information.

  6. Hazelwood Interim Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Hazelwood Interim Storage Site (HISS) during calendar year 1993. It includes an overview of site operations, the basis for monitoring for radioactive and non-radioactive parameters, summaries of environmental program at HISS, a summary of the results, and the calculated hypothetical radiation dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. The US Department of Energy (DOE) began environmental monitoring of HISS in 1984, when the site was assigned to DOE by Congress through the energy and Water Development Appropriations Act and subsequent to DOE's Formerly Utilized Sites Remediation Action Program (FUSRAP). Contamination at HISS originated from uranium processing work conducted at Mallinckrodt Chemical Works at the St. Louis Downtown Site (SLDS) from 1942 through 1957

  7. Compact and maintenance-free radio probes for environmental surveillance of the gamma dose rate

    International Nuclear Information System (INIS)

    Genrich, V.

    1998-01-01

    The author reports on his experience with the operation of radio data networks for the continuous observation of the gamma dose rate in nuclear installations. Practically at every location (within) the installation the hermetically sealed probes can record the measurement values. Moreover, the probes have proved successful in environmental surveillance where they typically work in the form of measurement rings in 10 to 30 km distance. All measurement data are organized in the form of a data base. They can be disposed of in the form of an SQL-server in the computer network (LAN) of the power plant or the institution in charge of environmental surveillance. In comparison to conventional, e.g. cable-bound measurement networks with the new radio transmission technology there are numerous advantages: - minimal cost for projection - minimal cost for installation due to simple fixing - quasi-mobile use with highest possible flexibility - maintenance-free operation and high degree of operating reliability. (orig.) [de

  8. Healthcare associated infections in neonatal intensive care unit and its correlation with environmental surveillance

    Directory of Open Access Journals (Sweden)

    Sanjay Kumar

    2018-03-01

    Full Text Available Healthcare-associated infections (HAI are frequent complications in neonatal intensive care units (NICU with varying risk factors and bacteriological profile. There is paucity of literature comparing the bacteriological profile of organisms causing HAI with the environmental surveillance isolates. Therefore, this study aimed to evaluate demographic profile, risk factors and outcome of HAI in NICU and correlate with environmental surveillance.Three hundred newborns with signs and symptoms of sepsis were enrolled in the study group and their profile, risk factors and outcome were compared with the control group. Univariate analysis and multivariable logistic regression were performed. Environmental surveillance results were compared to the bacteriological profile of HAIs.We identified lower gestational age, male gender and apgar score less than 7 at 5 min, use of peripheral vascular catheter & ventilator along with their duration as significant risk factors. Mortality rate was 29% in the study group (p < 0.05. The HAI site distribution showed blood-stream infections (73% to be the most common followed by pneumonia (12% and meningitis (10%. Gram positive cocci were the most common isolates in HAI as well as environmental surveillance.The bacteriological profile of HAI correlates with the environmental surveillance report thus insisting for periodic surveillance and thereby avoiding irrational antibiotic usage. Keywords: Healthcare associated infection, Neonatal intensive care unit, Environmental surveillance

  9. Environmental surveillance at Los Alamos during 2008

    Energy Technology Data Exchange (ETDEWEB)

    Fuehne, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gallagher, Pat [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hjeresen, Denny [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Isaacson, John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Johson, Scot [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Morgan, Terry [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Paulson, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Rogers, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2009-09-30

    Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (the Laboratory) Environmental Programs Directorate, as required by US Department of Energy Order 450.1, General Environmental Protection Program, and US Department of Energy Order 231.1A, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory’s efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory’s major environmental programs and explains the risks and the actions taken to reduce risks at the Laboratory from environmental legacies and waste management operations. Chapter 2 reports the Laboratory’s compliance status for 2007. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations and discusses chemical exposures. The environmental surveillance and monitoring data are organized by environmental media (Chapter 4, air; Chapters 5 and 6, water and sediments; Chapter 7, soils; and Chapter 8, foodstuffs and biota) in a format to meet the needs of a general and scientific audience. Chapter 9 provides a summary of the status of environmental restoration work around LANL. A glossary and a list of acronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the Laboratory’s technical areas and their associated programs, and Appendix D provides web links to more information.

  10. Environmental surveillance at Los Alamos during 2007

    Energy Technology Data Exchange (ETDEWEB)

    Lynch, Michelle; Brady, Doug

    2008-07-01

    Each year, LANL produces an Environmental Surveillance Report (ESR) in compliance with a Department of Energy (DOE) order. The ESR aims to summarize the environmental impacts of the Laboratory, the efforts to minimize these impacts, and LANL’s compliance with environmental regulations. This Summary Report presents the methods and results of environmental monitoring done in 2007 in a form that is more understandable and inviting to the public. Though other DOE sites have done Summary Reports in the past, this is LANL’s first for the ESR, and the authors were privileged to write this report from the perspective of students.

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV)

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2MHILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [CH2MHILL • B& W West Valley, LLC (CHBWV); Pendl, Michael P. [CH2MHILL • B& W West Valley, LLC (CHBWV)

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  15. An overview of background environmental radiological surveillance around Kudankulam nuclear power project site

    International Nuclear Information System (INIS)

    Rajan, M.P.; Vijayakumar, B.; George, Thomas; Rajan, P.S.; Rana, B.K.; Kumar, M.; Hegde, A.G.; Chougaonkar, M.P.

    2005-01-01

    A modern Environmental Survey Laboratory (ESL) equipped with state-of-art nuclear counting, chemical and ecological equipment's has been set up at Kudankulam at the very beginning of construction activities to carry out pre operational and baseline radioactivity measurements. Construction activities for the two VVER type 1000 MWe reactors at the site are progressing ahead of schedule and the first unit is slated to be critical in the year 2007. This paper presents the results of environmental radiological surveillance carried out for the last one year in Kudankulam environs. General radiation background in the area varies in the range of 0.1 - 0.7 μGy/h and elevated levels as high as 20 μGy/h are noticed in beach areas. The major contribution to the background radiation in high background areas comes from 232 Th and its daughter products. The concentrations of 40 K are of normal order and comparable to other NPP sites and normal background areas. The concentrations of fallout nuclides are very low and are at global fallout levels. (author)

  16. Colonie Interim Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Colonie Interim Storage Site (CISS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, dose to the offsite population, and summaries of environmental programs at CISS. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. Appendix A contains a discussion of the nature of radiation, the way it is measured, and common sources of it. The primary environmental guidelines and limits applicable to CISS are given in US Department of Energy (DOE) orders and mandated by six federal acts: the Clean Air Act; the Clean Water Act; the Resource Conservation and Recovery Act (RCRA); the Toxic Substances Control Act; the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); and the National Environmental Policy Act (NEPA). DOE began environmental monitoring of CISS in 1984 when DOE was authorized by Congress through the Energy and Water Development Appropriations Act to conduct a decontamination research and development program at the site. The site was subsequently assigned to DOE's Formerly Utilized Sites Remedial Action Program (FUSRAP)

  17. Hanford Site Environmental Surveillance Data Report for Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2009-08-11

    Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2008" (PNNL-18427), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

  18. Hanford Site Environmental Surveillance Data Report for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2008-10-13

    Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2007" (PNNL-17603), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. Environmental surveillance at Los Alamos during 2009

    Energy Technology Data Exchange (ETDEWEB)

    Fuehne, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Poff, Ben [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hjeresen, Denny [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Isaacson, John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Johnson, Scot [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Morgan, Terry [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Paulson, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Salzman, Sonja [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Rogers, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2010-09-30

    Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (the Laboratory) environmental organization, as required by US Department of Energy Order 5400.1, General Environmental Protection Program, and US Department of Energy Order 231.1A, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory’s efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory’s major environmental programs and explains the risks and the actions taken to reduce risks at the Laboratory from environmental legacies and waste management operations. Chapter 2 reports the Laboratory’s compliance status for 2009. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations and discusses chemical exposures. The environmental surveillance and monitoring data are organized by environmental media (air in Chapter 4; water and sediments in Chapters 5 and 6; soils in Chapter 7; and foodstuffs and biota in Chapter 8) in a format to meet the needs of a general and scientific audience. Chapter 9 provides a summary of the status of environmental restoration work around LANL. The new Chapter 10 describes the Laboratory’s environmental stewardship efforts and provides an overview of the health of the Rio Grande. A glossary and a list of acronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the Laboratory’s technical

  3. Overview of environmental surveillance of waste management activities at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Smith, T.H.; Hedahl, T.G.; Wiersma, G.B.; Chew, E.W.; Mann, L.J.; Pointer, T.F.

    1986-02-01

    The Idaho National Engineering Laboratory (INEL), in southeastern Idaho, is a principal center for nuclear energy development for the Department of Energy (DOE) and the US Nuclear Navy. Fifty-two reactors have been built at the INEL, with 15 still operable. Extensive environmental surveillance is conducted at the INEL by DOE's Radiological and Environmental Sciences Laboratory (RESL), the US Geological Survey (USGS), the National Oceanic and Atmospheric Administration (NOAA), EG and G Idaho, Inc., and Westinghouse Idaho Nuclear Company (WINCO). Surveillance of waste management facilities is integrated with the overall INEL Site surveillance program. Air, water, soil, biota, and environmental radiation are monitored or sampled routinely at the INEL. Results to date indicate very small or no impacts from the INEL on the surrounding environment. Environmental surveillance activities are currently underway to address key environmental issues at the INEL. 7 refs., 6 figs., 2 tabs

  4. Environmental surveillance at Los Alamos

    International Nuclear Information System (INIS)

    1979-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1978. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1978 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and groundwater, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs

  5. Polio eradication in India: progress, but environmental surveillance and vigilance still needed.

    Science.gov (United States)

    Chatterjee, Animesh; Vidyant, Sanjukta; Dhole, Tapan N

    2013-02-18

    Poliomyelitis has appeared in epidemic form, become endemic on a global scale, and has been reduced to near elimination, all within the span of documented medical history. Nevertheless, effective vaccinations, global surveillance network, development of accurate viral diagnosis prompted the historical challenge, global polio eradication initiative (GPEI). Environmental surveillance of poliovirus means monitoring of wild polio virus (WPV) and vaccine derived polio virus (cVDPV) circulation in human populations by examining environmental specimens supposedly contaminated by human feces. The rationale for surveillance is based on the fact that PV-infected individuals, whether presenting with disease symptoms or not, shed large amounts of PV in the feces for several weeks. As the morbidity: infection ratio of PV infection is very low, and therefore this fact contributes to the sensitivity of poliovirus surveillance, which under optimal conditions can be better than that of the standard acute flaccid paralysis (AFP) surveillance. The World Health Organization (WHO) has included environmental surveillance of poliovirus in the new Strategic Plan of the Global Polio Eradication Initiative for years 2010-2012 to be increasingly used in PV surveillance, supplementing AFP surveillance and the strategic advisory group of experts on immunization (SAGE) recommended a switch from tOPV-bOPV to remove the threat of cVDPV2 and to accelerate the elimination of WPV type 1 and 3 as bOPV is a more immunogenic vaccine and to introduce one dose of IPV in their vaccination schedule prior to OPV cessation. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

    Energy Technology Data Exchange (ETDEWEB)

    Steiner, Alison F. [CH2M Hill BWXT West Valley, LLC, NY (United States); Pendl, Michael P. [CH2M Hill BWXT West Valley, LLC, NY (United States); Steiner, II, Robert E. [CH2M Hill BWXT West Valley, LLC, NY (United States); Fox, James R. [CH2M Hill BWXT West Valley, LLC, NY (United States); Hoch, Jerald J. [CH2M Hill BWXT West Valley, LLC, NY (United States); Williams, Janice D. [CH2M Hill BWXT West Valley, LLC, NY (United States); Wrotniak, Chester M. [CH2M Hill BWXT West Valley, LLC, NY (United States); Werchowski, Rebecca L. [CH2M Hill BWXT West Valley, LLC, NY (United States)

    2017-09-12

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  7. Master schedule for CY-1982 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites

  8. Healthcare associated infections in neonatal intensive care unit and its correlation with environmental surveillance.

    Science.gov (United States)

    Kumar, Sanjay; Shankar, Binoy; Arya, Sugandha; Deb, Manorma; Chellani, Harish

    Healthcare-associated infections (HAI) are frequent complications in neonatal intensive care units (NICU) with varying risk factors and bacteriological profile. There is paucity of literature comparing the bacteriological profile of organisms causing HAI with the environmental surveillance isolates. Therefore, this study aimed to evaluate demographic profile, risk factors and outcome of HAI in NICU and correlate with environmental surveillance. Three hundred newborns with signs and symptoms of sepsis were enrolled in the study group and their profile, risk factors and outcome were compared with the control group. Univariate analysis and multivariable logistic regression were performed. Environmental surveillance results were compared to the bacteriological profile of HAIs. We identified lower gestational age, male gender and apgar score less than 7 at 5min, use of peripheral vascular catheter & ventilator along with their duration as significant risk factors. Mortality rate was 29% in the study group (p<0.05). The HAI site distribution showed blood-stream infections (73%) to be the most common followed by pneumonia (12%) and meningitis (10%). Gram positive cocci were the most common isolates in HAI as well as environmental surveillance. The bacteriological profile of HAI correlates with the environmental surveillance report thus insisting for periodic surveillance and thereby avoiding irrational antibiotic usage. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  9. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  10. Master schedule for CY-1978. Hanford Environmental Surveillance Routine Program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Myers, D.A.; Fix, J.J.

    1977-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. No results are presented in this report. The data collected are available in routine reports issued by the Environmental Evaluations staff

  11. An overview of environmental surveillance of waste management activities at the Idaho National Engineering Laboratory

    Science.gov (United States)

    Smith, T.H.; Chew, E.W.; Hedahl, T.G.; Mann, L.J.; Pointer, T.F.; Wiersma, G.B.

    1986-01-01

    The Idaho National Engineering Laboratory (INEL), in southeastern Idaho, is a principal center for nuclear energy development for the Department of Energy (DOE) and the U.S. Nuclear Navy. Fifty-two reactors have been built at the INEL, with 15 still operable. Extensive environmental surveillance is conducted at the INEL by DOE's Radiological Environmental Sciences Laboratory (RESL), and the U.S. Geological Survey (USGS), the National Oceanic and Atmospheric Administration (NOAA), EG&G Idaho, Inc., and Westinghouse Idaho Nuclear Company (WINCO). Surveillance of waste management facilities radiation is integrated with the overall INEL Site surveillance program. Air, warer, soil, biota, and environmental radiation are monitored or sampled routinely at INEL. Results to date indicate very small or no impacts from INEL on the surrounding environment. Environmental surveillance activities are currently underway to address key environmental issues at the INEL.

  12. Environmental Surveillance at Los Alamos during 2007

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-30

    Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (the Laboratory) Environmental Directorate, as required by US Department of Energy Order 450.1, General Environmental Protection Program, and US Department of Energy Order 231.1A, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory’s efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory’s major environmental programs and explains the risks and the actions taken to reduce risks at the Laboratory from environmental legacies and waste management operations. Chapter 2 reports the Laboratory’s compliance status for 2007. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations and discusses chemical exposures. The environmental surveillance and monitoring data are organized by environmental media (Chapter 4, air; Chapters 5 and 6, water and sediments; Chapter 7, soils; and Chapter 8, foodstuffs and biota) in a format to meet the needs of a general and scientific audience. Chapter 9 provides a summary of the status of environmental restoration work around LANL. A glossary and a list of acronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the laboratory’s technical areas and their associated programs, and Appendix D provides web links to more information. In printed copies of this report or Executive Summary, we have

  13. Insights from a Systematic Search for Information on Designs, Costs, and Effectiveness of Poliovirus Environmental Surveillance Systems.

    Science.gov (United States)

    Duintjer Tebbens, Radboud J; Zimmermann, Marita; Pallansch, Mark A; Thompson, Kimberly M

    2017-12-01

    Poliovirus surveillance plays a critical role in achieving and certifying eradication and will play a key role in the polio endgame. Environmental surveillance can provide an opportunity to detect circulating polioviruses prior to the observation of any acute flaccid paralysis cases. We completed a systematic review of peer-reviewed publications on environmental surveillance for polio including the search terms "environmental surveillance" or "sewage," and "polio," "poliovirus," or "poliomyelitis," and compared characteristics of the resulting studies. The review included 146 studies representing 101 environmental surveillance activities from 48 countries published between 1975 and 2016. Studies reported taking samples from sewage treatment facilities, surface waters, and various other environmental sources, although they generally did not present sufficient details to thoroughly evaluate the sewage systems and catchment areas. When reported, catchment areas varied from 50 to over 7.3 million people (median of 500,000 for the 25% of activities that reported catchment areas, notably with 60% of the studies not reporting this information and 16% reporting insufficient information to estimate the catchment area population size). While numerous studies reported the ability of environmental surveillance to detect polioviruses in the absence of clinical cases, the review revealed very limited information about the costs and limited information to support quantitative population effectiveness of conducting environmental surveillance. This review motivates future studies to better characterize poliovirus environmental surveillance systems and the potential value of information that they may provide in the polio endgame.

  14. Environmental radiological surveillance in perspective: the relative importance of environmental media as a function of effluent pathway and radionuclides

    International Nuclear Information System (INIS)

    Denham, D.H.

    1977-01-01

    Most published guidelines for environmental surveillance emphasize the collection and analysis of specific media (e.g. air, water, milk, direct radiation) without total regard for the potential dose impact of the radionuclides expected in or actually present in the effluent streams FR-om nuclear facilities. To determine the relative importance of medium/nuclide combinations in environmental surveillance, the experience at major ERDA sites and at operating nuclear power plants was reviewed. Typical release rates for nuclide groupings (tritium, noble gases, radioiodine, mixed fission or activation products, and transuranics) in those effluent streams were followed through various environmental pathways. By using this scheme the environmental medium which is most prominent in the critical dose pathway to man was determined. It was also possible to determine points of short-or long-term contaminant accumulation. Following these combination providing the relative importance of sampling specific environmental media with emphasis on the radiation dose to a critical population group. Finally, the results of these environmental pathway studies are presented in tabular form to provide ready reference for environmental surveillance program design or evaluation

  15. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    International Nuclear Information System (INIS)

    2009-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    International Nuclear Information System (INIS)

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner II, Robert E.; Fox, James R.; Hoch, Jerald J.; Wrotniak, Chester M.; Werchowski, Rebecca L.

    2016-01-01

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  18. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  19. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Wrotniak, Chester M. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2016-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  20. Environmental surveillance monitoring in the Alligator Rivers Region. Report for the six months period ending 30 September 1996

    International Nuclear Information System (INIS)

    1996-01-01

    This report outlines the activities of the Northern Territory Supervising Authorities in meeting their responsibilities for environmental management and surveillance, occupational safety, relating to uranium mining and environment protection in the Alligator Rivers Region. Environmental monitoring was carried out at the Nabarlek Mine, which site has now been rehabilitated and revegetated, and at Ranger, the only mine currently operating in the region. Other uranium projects such as Jabiluka and Koongarra have been delayed due to the former Commonwealth Government's 'three mines policy'. 4 tabs., 10 figs

  1. State partnership in environmental health and safety phase of Plowshare projects

    Energy Technology Data Exchange (ETDEWEB)

    Kinsman, S [California State Department of Public Health, Berkeley, CA (United States)

    1969-07-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  2. State partnership in environmental health and safety phase of Plowshare projects

    International Nuclear Information System (INIS)

    Kinsman, S.

    1969-01-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  3. Environmental surveillance at Los Alamos during 1991. Environmental protection group

    Energy Technology Data Exchange (ETDEWEB)

    Dewart, J.; Kohen, K.L. [comps.

    1993-08-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1991. Routine monitoring for radiation and for radioactive and chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1991 cover external penetrating radiation; quantities of airborne emissions and effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are small and do not pose a threat to the public, Laboratory employees, or the environment.

  4. Environmental radiological surveillance in perspective: the relative importance of environmental media as a function of effluent pathway and radionuclides

    International Nuclear Information System (INIS)

    Denham, D.H.

    1977-10-01

    Most published guidelines for environmental surveillance emphasize the collection and analysis of specific media (e.g. air, water, milk, direct radiation) without total regard for the potential dose impact of the radionuclides expected in or actually present in the effluent streams from nuclear facilities. To determine the relative importance of medium/nuclide combinations in environmental surveillance, the experience at major ERDA sites and at operating nuclear power plants was reviewed. Typical release rates for nuclide groupings (tritium, noble gases, radioiodine, mixed fission or activation products, and transuranics) in those effluent streams were followed through various environmental pathways. By using this scheme the environmental medium which is most prominent in the critical dose pathway to man was determined. It was also possible to determine points of short-or long-term contaminant accumulation. Following these calculations, each medium was ranked for a given nuclide/effluent pathway combination providing the relative importance of sampling specific environmental media with emphasis on the radiation dose to a critical population group. Finally, the results of these environmental pathway studies are presented in tabular form to provide ready reference for environmental surveillance program design or evaluation

  5. N-CDAD in Canada: Results of the Canadian Nosocomial Infection Surveillance Program 1997 N-CDAD Prevalence Surveillance Project

    Directory of Open Access Journals (Sweden)

    Meaghen Hyland

    2001-01-01

    Full Text Available BACKGROUND: A 1996 preproject survey among Canadian Hospital Epidemiology Committee (CHEC sites revealed variations in the prevention, detection, management and surveillance of Clostridium difficile-associated diarrhea (CDAD. Facilities wanted to establish national rates of nosocomially acquired CDAD (N-CDAD to understand the impact of control or prevention measures, and the burden of N-CDAD on health care resources. The CHEC, in collaboration with the Laboratory Centre for Disease Control (Health Canada and under the Canadian Nosocomial Infection Surveillance Program, undertook a prevalence surveillance project among selected hospitals throughout Canada.

  6. Ground-water sample collection and analysis plan for the ground-water surveillance project

    International Nuclear Information System (INIS)

    Bryce, R.W.; Evans, J.C.; Olsen, K.B.

    1991-12-01

    The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy's (DOE's) Hanford Site in support of DOE's environmental surveillance responsibilities. The purpose of this document is to translate DOE's General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives

  7. Quality-control activities of the Hanford Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Price, K.R.; Jaquish, R.E.

    1982-01-01

    A comprehensive approach to quality control (QC) has been developed by the Pacific Northwest Laboratory for the Hanford Environmental Surveillance Program. The framework of quality control for the surveillance program has been documented in a QC implementation guide wherein QC requirements are specified and specific responsibilities and authorities are described. Subjects in the guide include the collection, analysis, and reporting of samples as well as equipment calibration and maintenance, training, audits, and record keeping. A QC file and library have been established to store pertinent documentation, records, and references for ready access

  8. Personnel, Area And Environmental Surveillance Practices At The PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Ligam, A.S.; Zarina Masood; Mohammad Suhaimi Kassim; Ismail Sulaiman; Mohd Fazli Zakaria; Ahmad Nabil Abdul Rahim

    2013-01-01

    Personnel, area and environmental surveillance at research reactors are important to ensure that the worker, public and environment do not receive radiation doses exceeding the prescribed national limits. A surveillance programme has been in place ever since the PUSPATI TRIGA Reactor (RTP) first started its operation in 1982. The results of the surveillance have to be reported to the national regulatory body as well as the International Atomic Energy Agency. This paper will discuss the findings and improvements of the surveillance programme over the past few years. It can be concluded that workers, public and the environment does not receive doses in excess of the prescribed limits due to the operation of the RTP.(author)

  9. Guide for: environmental radiological surveillance at US Department of Energy installations

    International Nuclear Information System (INIS)

    Corley, J.P.; Denham, D.H.; Jaquish, R.E.; Michels, D.E.; Olsen, A.R.; Waite, D.A.

    1981-07-01

    This second edition of the Guide, originally published in 1977, is presented as an interim revision and does not contain major changes in content. The original objectives and scope of the Guide have not changed. The Guide is intended to: provide recommended methods, procedures, and performance criteria to bring greater comparability to DOE environmental monitoring and reporting systems; provide DOE management, particularly the Headquarters' Operational and Environmental Safety Division (OESD) and field offices, with a broad review of accepted radiological surveillance practices for use in the evaluation of environmental surveillance programs at DOE facilities; and delineate the capabilities and limitations of the various environmental monitoring systems for radioactivity currently used at DOE sites, including technical areas where there is either an inadequate basis for procedural selection or where further development work may be warranted. The document is intended as a guide, not a manual of detailed mandatory procedure

  10. New England States environmental radiation surveillance programs

    International Nuclear Information System (INIS)

    Molloy, E.J.

    1980-01-01

    An overview of the environmental radiation surveillance programs in the New England States from the viewpoint of their organization and administration is provided. Moreover, the specific monitoring and analytical programs conducted at selected sites in each state is detailed with emphasis on sample types, collection frequencies, and analysis. Also, a comparison is made between the programs of all the states in order to determine the reasons for their differences

  11. Environmental surveillance at Los Alamos during 1992

    International Nuclear Information System (INIS)

    Kohen, K.; Stoker, A.; Stone, G.

    1994-07-01

    This report describes the environmental surveillance program at Los Alamos National Laboratory during 1992. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring results to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1992 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, laboratory employees, or the environment

  12. Environmental surveillance at Los Alamos during 1986

    International Nuclear Information System (INIS)

    1987-04-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1986. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit eartly identification of potentially undesirable trends. Results and interpertation of data for 1986 cover: external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparison with appropriate standards, regulations, and backgound levels provide the basis for concluding that environmental effects from Laboratory operations are insignificant and do not impact the public, Laboratory employees, or the environment. 52 refs., 32 figs., 117 tabs

  13. Environmental surveillance at Los Alamos during 1991

    International Nuclear Information System (INIS)

    Dewart, J.; Kohen, K.L.

    1993-08-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1991. Routine monitoring for radiation and for radioactive and chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1991 cover external penetrating radiation; quantities of airborne emissions and effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are small and do not pose a threat to the public, Laboratory employees, or the environment

  14. Environmental surveillance at Los Alamos during 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This report describes the environmental surveillance program at Los Alamos National Laboratory (LANL or the Laboratory) during 1995. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring result to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1995 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, Laboratory employees, or the environment.

  15. Environmental surveillance at Los Alamos during 1992

    Energy Technology Data Exchange (ETDEWEB)

    Kohen, K.; Stoker, A.; Stone, G. [and others

    1994-07-01

    This report describes the environmental surveillance program at Los Alamos National Laboratory during 1992. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring results to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1992 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, laboratory employees, or the environment.

  16. Environmental surveillance at Los Alamos during 1995

    International Nuclear Information System (INIS)

    1996-10-01

    This report describes the environmental surveillance program at Los Alamos National Laboratory (LANL or the Laboratory) during 1995. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring result to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1995 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, Laboratory employees, or the environment

  17. Environmental surveillance at Los Alamos during 1990

    International Nuclear Information System (INIS)

    1992-03-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1990. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1990 cover external penetrating radiation; quantities of airborne emissions and effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are small and do not pose a threat to the public, Laboratory employees, or the environment

  18. Data analysis and interpretation for environmental surveillance

    International Nuclear Information System (INIS)

    1992-06-01

    The Data Analysis and Interpretation for Environmental Surveillance Conference was held in Lexington, Kentucky, February 5--7, 1990. The conference was sponsored by what is now the Office of Environmental Compliance and Documentation, Oak Ridge National Laboratory. Participants included technical professionals from all Martin Marietta Energy Systems facilities, Westinghouse Materials Company of Ohio, Pacific Northwest Laboratory, and several technical support contractors. Presentations at the conference ranged the full spectrum of issues that effect the analysis and interpretation of environmental data. Topics included tracking systems for samples and schedules associated with ongoing programs; coalescing data from a variety of sources and pedigrees into integrated data bases; methods for evaluating the quality of environmental data through empirical estimates of parameters such as charge balance, pH, and specific conductance; statistical applications to the interpretation of environmental information; and uses of environmental information in risk and dose assessments. Hearing about and discussing this wide variety of topics provided an opportunity to capture the subtlety of each discipline and to appreciate the continuity that is required among the disciplines in order to perform high-quality environmental information analysis

  19. Westinghouse Hanford Company environmental surveillance annual report -- 200/600 Areas

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Huckfeldt, C.R.; Johnson, A.R.; McKinney, S.M.

    1990-06-01

    This document presents the results of near-field environmental surveillance as performed by Westinghouse Hanford Company in 1989 for the Operations Area of the Hanford Site, Richland, Washington. These activities were conducted in the 200 and 600 Areas to assess operational control on the work environment. Surveillance activities included external radiation measurements and radiological surveys of waste disposal sites, radiological control areas, and roads, as well as sampling and analysis of ambient air, surface water, groundwater, sediments, soil, and biota. 15 refs., 3 figs., 1 tab

  20. Ethics issues experienced in HBM within Portuguese health surveillance and research projects

    Directory of Open Access Journals (Sweden)

    Miguel J Pereira

    2008-01-01

    Full Text Available Abstract Background In keeping with the fundamental practice of transparency in the discussion and resolution of ethics conflicts raised by research, a summary of ethics issues raised during Portuguese biomonitoring in health surveillance and research is presented and, where applicable, their resolution is described. Methods Projects underway aim to promote the surveillance of public health related to the presence of solid waste incinerators or to study associations between human exposure to environmental factors and adverse health effects. The methodological approach involves biomonitoring of heavy metals, dioxins and/or other persistent organic pollutants in tissues including blood, human milk and both scalp and pubic hair in groups such as the general population, children, pregnant women or women attempting pregnancy. As such, the projects entail the recruitment of individuals representing different demographic and health conditions, the collection of body tissues and personal data, and the processing of the data and results. Results The issue of autonomy is raised during the recruitment of participants and during the collection of samples and data. This right is protected by the requirement for prior written, informed consent from the participant or, in the case of children, from their guardian. Recruitment has been successful, among eligible participants, in spite of incentives rarely being offered. The exception has been in obtaining guardians' consent for children's participation, particularly for blood sampling. In an attempt to mitigate the harm-benefit ratio, current research efforts include alternative less invasive biomarkers. Surveys are currently being conducted under contract as independent biomonitoring actions and as such, must be explicitly disclosed as a potential conflict of interests. Communication of results to participants is in general only practised when a health issue is present and corrective action possible

  1. Environmental surveillance at Los Alamos during 1987

    International Nuclear Information System (INIS)

    1988-05-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1987. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1987 cover: external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are insignificant and do not pose a threat to the public, Laboratory employees, or the environment. 113 refs., 33 figs., 120 tabs

  2. Environmental surveillance at Los Alamos during 1985

    International Nuclear Information System (INIS)

    1986-04-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1985. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of possible undesirable trends. Results and interpretation of data for 1985 cover: external penetrating radiation; chemical and radiochemical quality of ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; quantities of airborne emissions and liquid effluents; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels from natural or other non-Laboratory sources provide the basis for concluding that environmental effects attributable to Laboratory operations are insignificant and are not considered hazardous to the population of the area or Laboratory employees

  3. Environmental surveillance at Los Alamos during 1989

    International Nuclear Information System (INIS)

    1990-12-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1989. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1989 cover external penetrating radiation; quantities of airborne emissions and effluents; concentrations of chemicals and radionuclides in ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are small and do not pose a threat to the public, Laboratory employees, or the environment. 58 refs., 31 figs., 39 tabs

  4. Environmental surveillance at Los Alamos during 1980

    International Nuclear Information System (INIS)

    1981-04-01

    Documentation is presented for the environmental surveillance program during 1980. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1980 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies describe some unique environmental conditions in the Laboratory environs

  5. Environmental surveillance at Los Alamos during 1987

    Energy Technology Data Exchange (ETDEWEB)

    1988-05-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1987. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1987 cover: external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are insignificant and do not pose a threat to the public, Laboratory employees, or the environment. 113 refs., 33 figs., 120 tabs.

  6. Niagara Falls Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Niagara Falls Storage Site (NFSS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, a summary of the results, and the estimated dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. NFSS is in compliance with National Emission Standards for Hazardous Air Pollutants (NESHAPs) Subpart H of the Clean Air Act as well as the requirements of the National Pollutant Discharge Elimination System (NPDES) under the Clean Water Act. Located in northwestern New York, the site covers 191 acres. From 1944 to the present, the primary use of NFSS has been storage of radioactive residues that were by-products of uranium production. Most onsite areas of residual radioactivity above regulatory guidelines were remediated during the early 1980s. Additional isolated areas of onsite contamination were remediated in 1989, and the materials were consolidated into the waste containment structure in 1991. Remediation of the site has now been completed

  7. Quality assurance applied to an environmental surveillance program

    International Nuclear Information System (INIS)

    Oakes, T.W.; Shank, K.E.; Eldridge, J.S.

    1977-01-01

    A discussion of a quality assurance program applied to environmental surveillance activities is presented. This includes the philosophy and concepts of quality assurance, along with a detailed assessment of the sources of uncertainty in a monitoring program. The role management must play for a successful program is also discussed, and the quality assurance program implemented at Oak Ridge National Laboratory is presented

  8. Environmental surveillance for polioviruses in the Global Polio Eradication Initiative.

    Science.gov (United States)

    Asghar, Humayun; Diop, Ousmane M; Weldegebriel, Goitom; Malik, Farzana; Shetty, Sushmitha; El Bassioni, Laila; Akande, Adefunke O; Al Maamoun, Eman; Zaidi, Sohail; Adeniji, Adekunle J; Burns, Cara C; Deshpande, Jagadish; Oberste, M Steve; Lowther, Sara A

    2014-11-01

    This article summarizes the status of environmental surveillance (ES) used by the Global Polio Eradication Initiative, provides the rationale for ES, gives examples of ES methods and findings, and summarizes how these data are used to achieve poliovirus eradication. ES complements clinical acute flaccid paralysis (AFP) surveillance for possible polio cases. ES detects poliovirus circulation in environmental sewage and is used to monitor transmission in communities. If detected, the genetic sequences of polioviruses isolated from ES are compared with those of isolates from clinical cases to evaluate the relationships among viruses. To evaluate poliovirus transmission, ES programs must be developed in a manner that is sensitive, with sufficiently frequent sampling, appropriate isolation methods, and specifically targeted sampling sites in locations at highest risk for poliovirus transmission. After poliovirus ceased to be detected in human cases, ES documented the absence of endemic WPV transmission and detected imported WPV. ES provides valuable information, particularly in high-density populations where AFP surveillance is of poor quality, persistent virus circulation is suspected, or frequent virus reintroduction is perceived. Given the benefits of ES, GPEI plans to continue and expand ES as part of its strategic plan and as a supplement to AFP surveillance. Published by Oxford University Press on behalf of the Infectious Diseases Society of America 2014. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  9. The role of supplementary environmental surveillance to complement acute flaccid paralysis surveillance for wild poliovirus in Pakistan - 2011-2013.

    Directory of Open Access Journals (Sweden)

    Tori L Cowger

    Full Text Available More than 99% of poliovirus infections are non-paralytic and therefore, not detected by acute flaccid paralysis (AFP surveillance. Environmental surveillance (ES can detect circulating polioviruses from sewage without relying on clinical presentation. With extensive ES and continued circulation of polioviruses, Pakistan presents a unique opportunity to quantify the impact of ES as a supplement to AFP surveillance on overall completeness and timeliness of poliovirus detection.Genetic, geographic and temporal data were obtained for all wild poliovirus (WPV isolates detected in Pakistan from January 2011 through December 2013. We used viral genetics to assess gaps in AFP surveillance and ES as measured by detection of 'orphan viruses' (≥1.5% different in VP1 capsid nucleotide sequence. We compared preceding detection of closely related circulating isolates (≥99% identity detected by AFP surveillance or ES to determine which surveillance system first detected circulation before the presentation of each polio case.A total of 1,127 WPV isolates were detected by AFP surveillance and ES in Pakistan from 2011-2013. AFP surveillance and ES combined exhibited fewer gaps (i.e., % orphan viruses in detection than AFP surveillance alone (3.3% vs. 7.7%, respectively. ES detected circulation before AFP surveillance in nearly 60% of polio cases (200 of 346. For polio cases reported from provinces conducting ES, ES detected circulation nearly four months sooner on average (117.6 days than did AFP surveillance.Our findings suggest ES in Pakistan is providing earlier, more sensitive detection of wild polioviruses than AFP surveillance alone. Overall, targeted ES through strategic selection of sites has important implications in the eradication endgame strategy.

  10. Environmental surveillance at Hanford for CY-1974 data

    International Nuclear Information System (INIS)

    Fix, J.J.; Blumer, P.J.

    1975-04-01

    Data collected by the Hanford Environmental Surveillance program during 1974 are presented in tables. Data are included on radiological parameters measured in the atmosphere, Columbia River water, drinking water; radionuclides in soil and vegetation, fish and wildlife, and selected foodstuffs; measurements of external radiation doses; and nonradiological parameters measured in the atmosphere, drinking water, and Columbia River water. Methods of sample collection are described briefly. (U.S.)

  11. Environmental surveillance at Los Alamos during 1979

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1979. Routine monitoring for radiation and radioactive or chemical substances was conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1979 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs.

  12. Environmental surveillance at Los Alamos during 1981

    International Nuclear Information System (INIS)

    1982-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos National Laboratory during 1981. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of data for 1981 are included on penetrating radiation; on the chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soil and sediments, and food; and on the quantities of airborne emissions and liquid effluents. Comparisons with appropriate standards and regulations or with background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are insignificant and are not considered hazardous to the population of the area. Results of several special studies describe some unique environmental conditions in the Laboratory environs

  13. Environmental surveillance at Los Alamos during 1979

    International Nuclear Information System (INIS)

    1980-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1979. Routine monitoring for radiation and radioactive or chemical substances was conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1979 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs

  14. Design, Implementation, and Evaluation of the Adolescents and Surveillance System for the Obesity Prevention Project.

    Science.gov (United States)

    Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina

    2016-03-01

    The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents' obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data.The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have.This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries' needs and priorities.The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries' Health Services for monitoring adolescents' obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles.

  15. Summary of environmental surveillance at Los Alamos during 1995

    International Nuclear Information System (INIS)

    1996-10-01

    Linking the Rio Grande Valley and the Jemez Mountains, New Mexico's Pajarito Plateau is home to a world-class scientific institution. Los Alamos National Laboratory (or the Laboratory), managed by the Regents of the University of California, is a government-owned, Department of Energy-supervised complex investigating all areas of modern science for the purposes of national defense, health, conservation, and ecology. The Laboratory was founded in 1943 as part of the Manhattan Project, whose members assembled to create the first nuclear weapon. Occupying the campus of the Los Alamos Ranch School, American and British scientists gathered on the isolated mesa tops to harness recently discovered nuclear power with the hope of ending World War II. In July 1945, the initial objective of the Laboratory, a nuclear device, was achieved in Los Alamos and tested in White Sands, New Mexico. Today the Laboratory continues its role in defense, particularly in nuclear weapons, including developing methods for safely handling weapons and managing waste. For the past twenty years, the Laboratory has published an annual environmental report. This pamphlet offers a synopsis that briefly explains important concepts, such as radiation and provides a summary of the monitoring results and regulatory compliance status that are explained at length in the document entitled Environmental Surveillance at Los Alamos during 1995

  16. Polio and Measles Down the Drain: Environmental Enterovirus Surveillance in the Netherlands, 2005 to 2015.

    Science.gov (United States)

    Benschop, Kimberley S M; van der Avoort, Harrie G; Jusic, Edin; Vennema, Harry; van Binnendijk, Rob; Duizer, Erwin

    2017-07-01

    Polioviruses (PVs) are members of the genus Enterovirus In the Netherlands, the exclusion of PV circulation is based on clinical enterovirus (EV) surveillance (CEVS) of EV-positive cases and routine environmental EV surveillance (EEVS) conducted on sewage samples collected in the region of the Netherlands where vaccination coverage is low due to religious reasons. We compared the EEVS data to those of the CEVS to gain insight into the relevance of EEVS for poliovirus and nonpolio enterovirus surveillance. Following the polio outbreak in Syria, EEVS was performed at the primary refugee center in Ter Apel in the Netherlands, and data were compared to those of CEVS and EEVS. Furthermore, we assessed the feasibility of poliovirus detection by EEVS using measles virus detection in sewage during a measles outbreak as a proxy. Two Sabin-like PVs were found in routine EEVS, 11 Sabin-like PVs were detected in the CEVS, and one Sabin-like PV was found in the Ter Apel sewage. We observed significant differences between the three programs regarding which EVs were found. In 6 sewage samples collected during the measles outbreak in 2013, measles virus RNA was detected in regions where measles cases were identified. In conclusion, we detected PVs, nonpolio EVs, and measles virus in sewage and showed that environmental surveillance is useful for poliovirus detection in the Netherlands, where live oral poliovirus vaccine is not used and communities with lower vaccination coverage exist. EEVS led to the detection of EV types not seen in the CEVS, showing that EEVS is complementary to CEVS. IMPORTANCE We show that environmental enterovirus surveillance complements clinical enterovirus surveillance for poliovirus detection, or exclusion, and for nonpolio enterovirus surveillance. Even in the presence of adequate surveillance, only a very limited number of Sabin-like poliovirus strains were detected in a 10-year period, and no signs of transmission of oral polio vaccine (OPV) strains

  17. Westinghouse Hanford Company Environmental surveillance annual report--200/600 Areas

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Huckfeldt, C.R.; Johnson, A.R.; McKinney, S.M.

    1991-06-01

    This document presents the results of near-field environmental surveillance in 1990 of the Operations Area of the Hanford Site, in south central Washington State, as performed by Westinghouse Hanford Company. These activities are conducted in the 200 and 600 Areas to assess and control the impacts of operations on the workers and the local environment. Surveillance activities include sampling and analyses of ambient air, surface water, groundwater, sediments, soil, and biota. Also, external radiation measurements and radiological surveys are taken of waste disposal sites, radiological control areas, and roads. 16 refs., 3 figs., 1 tab

  18. Statistical distributions as applied to environmental surveillance data

    International Nuclear Information System (INIS)

    Speer, D.R.; Waite, D.A.

    1975-09-01

    Application of normal, log normal, and Weibull distributions to environmental surveillance data was investigated for approximately 300 nuclide-medium-year-location combinations. Corresponding W test calculations were made to determine the probability of a particular data set falling within the distribution of interest. Conclusions are drawn as to the fit of any data group to the various distributions. The significance of fitting statistical distributions to the data is discussed

  19. Switch from oral to inactivated poliovirus vaccine in Yogyakarta Province, Indonesia: summary of coverage, immunity, and environmental surveillance.

    Science.gov (United States)

    Wahjuhono, Gendro; Revolusiana; Widhiastuti, Dyah; Sundoro, Julitasari; Mardani, Tri; Ratih, Woro Umi; Sutomo, Retno; Safitri, Ida; Sampurno, Ondri Dwi; Rana, Bardan; Roivainen, Merja; Kahn, Anna-Lea; Mach, Ondrej; Pallansch, Mark A; Sutter, Roland W

    2014-11-01

    Inactivated poliovirus vaccine (IPV) is rarely used in tropical developing countries. To generate additional scientific information, especially on the possible emergence of vaccine-derived polioviruses (VDPVs) in an IPV-only environment, we initiated an IPV introduction project in Yogyakarta, an Indonesian province. In this report, we present the coverage, immunity, and VDPV surveillance results. In Yogyakarta, we established environmental surveillance starting in 2004; and conducted routine immunization coverage and seroprevalence surveys before and after a September 2007 switch from oral poliovirus vaccine (OPV) to IPV, using standard coverage and serosurvey methods. Rates and types of polioviruses found in sewage samples were analyzed, and all poliovirus isolates after the switch were sequenced. Vaccination coverage (>95%) and immunity (approximately 100%) did not change substantially before and after the IPV switch. No VDPVs were detected. Before the switch, 58% of environmental samples contained Sabin poliovirus; starting 6 weeks after the switch, Sabin polioviruses were rarely isolated, and if they were, genetic sequencing suggested recent introductions. This project demonstrated that under almost ideal conditions (good hygiene, maintenance of universally high IPV coverage, and corresponding high immunity against polioviruses), no emergence and circulation of VDPV could be detected in a tropical developing country setting. © The Author 2014. Published by Oxford University Press on behalf of the Infectious Diseases Society of America. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  20. Environmental surveillance for the EG and G Idaho Radioactive Waste Management areas at the Idaho National Engineering Laboratory. Annual report 1985

    International Nuclear Information System (INIS)

    Reyes, B.D.; Case, M.J.; Wilhelmsen, R.N.

    1986-08-01

    The 1985 environmental surveillance report for the EG and G Idaho, Inc., radioactive waste management areas at the Idaho National Engineering Laboratory describes the environmental monitoring activities at the Radioactive Waste Management Complex (RWMC), the Waste Experimental Reduction Facility (WERF), the Process Experimental Pilot Plant (PREPP), and two surplus facilities. The purpose of these monitoring activities is to provide for continuous evaluation and awareness of environmental conditions resulting from current operations, to detect significant trends, and to project possible future conditions. This report provides a public record comparing RWMC, WERF, PREPP, and surplus facility environmental data with past results and radiation protection standards or concentration guides established for operation of Department of Energy facilities

  1. 1995 annual epidemiologic surveillance report for Idaho National Engineering and Environmental Laboratory

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) conduct of epidemiologic surveillance provides an early warning system for health problems among workers. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report summarizes epidemiologic surveillance data collected from the Idaho National Engineering and Environmental Laboratory (INEEL) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at INEEL and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out

  2. 1995 annual epidemiologic surveillance report for Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The US Department of Energy's (DOE) conduct of epidemiologic surveillance provides an early warning system for health problems among workers. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report summarizes epidemiologic surveillance data collected from the Idaho National Engineering and Environmental Laboratory (INEEL) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at INEEL and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  3. Wisconsin’s Environmental Public Health Tracking Network: Information Systems Design for Childhood Cancer Surveillance

    Science.gov (United States)

    Hanrahan, Lawrence P.; Anderson, Henry A.; Busby, Brian; Bekkedal, Marni; Sieger, Thomas; Stephenson, Laura; Knobeloch, Lynda; Werner, Mark; Imm, Pamela; Olson, Joseph

    2004-01-01

    In this article we describe the development of an information system for environmental childhood cancer surveillance. The Wisconsin Cancer Registry annually receives more than 25,000 incident case reports. Approximately 269 cases per year involve children. Over time, there has been considerable community interest in understanding the role the environment plays as a cause of these cancer cases. Wisconsin’s Public Health Information Network (WI-PHIN) is a robust web portal integrating both Health Alert Network and National Electronic Disease Surveillance System components. WI-PHIN is the information technology platform for all public health surveillance programs. Functions include the secure, automated exchange of cancer case data between public health–based and hospital-based cancer registrars; web-based supplemental data entry for environmental exposure confirmation and hypothesis testing; automated data analysis, visualization, and exposure–outcome record linkage; directories of public health and clinical personnel for role-based access control of sensitive surveillance information; public health information dissemination and alerting; and information technology security and critical infrastructure protection. For hypothesis generation, cancer case data are sent electronically to WI-PHIN and populate the integrated data repository. Environmental data are linked and the exposure–disease relationships are explored using statistical tools for ecologic exposure risk assessment. For hypothesis testing, case–control interviews collect exposure histories, including parental employment and residential histories. This information technology approach can thus serve as the basis for building a comprehensive system to assess environmental cancer etiology. PMID:15471739

  4. Management of environmental health issues for the 2004 Athens Olympic Games: is enhanced integrated environmental health surveillance needed in every day routine operation?

    Directory of Open Access Journals (Sweden)

    Chervoni Julia

    2006-12-01

    Full Text Available Abstract Background Management of environmental health issues is an integral part of public health systems. An active integrated environmental health surveillance and response system was developed for the Athens Olympics to monitor and prevent exposure to environmental hazards. The potential for permanent implementation of the program was examined. Methods The environmental health surveillance and response system included standardization, computerization and electronic transmission of data concerning environmental inspections of 17 site categories (restaurants, swimming pools etc of public health interest, drinking and recreational water examinations and suggested corrective actions. The Olympic Planning Unit integrated and centrally managed data from 13 public health agencies, recommended, supervised and coordinated prompt corrective actions. Methods used to test the effectiveness of the program were the assessment of water quality test and inspection results trends over time using linear regression and epidemiological surveillance findings. Results Between January 2003 and September the 30th, 2004, 196 inspectors conducted 8562 inspections, collected 5024 water samples and recommended 17 027 corrective actions. In 10 cruise ships used as floating hotels inspectors conducted 10 full inspections, 2 re-inspections, and 27 follow-up inspections. Unsatisfactory inspection results (r = 0.44, p Conclusion Lessons learned for future events include timely implementation and installation of communication processes, and rapid and coordinated response to unsatisfactory inspection results. Routine national programs need to adopt enhanced environmental health surveillance aimed at public health decision-making, but with a different perspective.

  5. Management of environmental health issues for the 2004 Athens Olympic Games: is enhanced integrated environmental health surveillance needed in every day routine operation?

    Science.gov (United States)

    Hadjichristodoulou, Christos; Mouchtouri, Varvara; Vaitsi, Vasiliki; Kapoula, Christina; Vousoureli, Anastasia; Kalivitis, Isidiros; Chervoni, Julia; Papastergiou, Panagiotis; Vasilogiannakopoulos, Antonios; Daniilidis, Vasilis D; Kremastinou, Jenny

    2006-12-18

    Management of environmental health issues is an integral part of public health systems. An active integrated environmental health surveillance and response system was developed for the Athens Olympics to monitor and prevent exposure to environmental hazards. The potential for permanent implementation of the program was examined. The environmental health surveillance and response system included standardization, computerization and electronic transmission of data concerning environmental inspections of 17 site categories (restaurants, swimming pools etc) of public health interest, drinking and recreational water examinations and suggested corrective actions. The Olympic Planning Unit integrated and centrally managed data from 13 public health agencies, recommended, supervised and coordinated prompt corrective actions. Methods used to test the effectiveness of the program were the assessment of water quality test and inspection results trends over time using linear regression and epidemiological surveillance findings. Between January 2003 and September the 30th, 2004, 196 inspectors conducted 8562 inspections, collected 5024 water samples and recommended 17 027 corrective actions. In 10 cruise ships used as floating hotels inspectors conducted 10 full inspections, 2 re-inspections, and 27 follow-up inspections. Unsatisfactory inspection results (r = 0.44, p quality tests (r = 0.39, p restaurant which accommodated athletes during a test event. Lessons learned for future events include timely implementation and installation of communication processes, and rapid and coordinated response to unsatisfactory inspection results. Routine national programs need to adopt enhanced environmental health surveillance aimed at public health decision-making, but with a different perspective.

  6. Environmental surveillance at Los Alamos during 1983

    International Nuclear Information System (INIS)

    1984-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos National Laboratory during 1983. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of data for 1983 are included on external penetrating radiation; on the chemical and radiochemical quality of ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and on the quantities of airborne emissions and liquid effluents. Comparisons with appropriate standards, regulations, and background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are insignificant and are not considered hazardous to the population of the area of Laboratory employees. 61 references, 34 figures, 22 tables

  7. Environmental surveillance at Los Alamos during 1984

    International Nuclear Information System (INIS)

    1985-04-01

    This report describes the environmental surveillance program conducted by the Los Alamos National Laboratory during 1984. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of data for 1984 are included on external penetrating radiation; on the chemical and radiochemical quality of ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and on the quantities of airborne emissions and liquid effluents. Comparisons with appropriate standards, regulations, and background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are insignificant and are not considered hazardous to the population of the area or Laboratory employees. 8 refs., 38 figs., 57 tabs

  8. Polio and Measles Down the Drain: Environmental Enterovirus Surveillance in the Netherlands, 2005 to 2015.

    NARCIS (Netherlands)

    Benschop, Kimberley S M; van der Avoort, Harrie G; Jusic, Edin; Vennema, Harry; van Binnendijk, Rob; Duizer, Erwin

    2017-01-01

    Polioviruses (PVs) are members of the genus Enterovirus In the Netherlands, the exclusion of PV circulation is based on clinical enterovirus (EV) surveillance (CEVS) of EV-positive cases and routine environmental EV surveillance (EEVS) conducted on sewage samples collected in the region of the

  9. Integrated environmental monitoring program at the Hanford Site

    International Nuclear Information System (INIS)

    Jaquish, R.E.

    1990-08-01

    The US Department of Energy's Hanford Site, north of Richland, Washington, has a mission of defense production, waste management, environmental restoration, advanced reactor design, and research development. Environmental programs at Hanford are conducted by Pacific Northwest Laboratory (PNL) and the Westinghouse Hanford Company (WHC). The WHC environmental programs include the compliance and surveillance activities associated with site operations and waste management. The PNL environmental programs address the site-wide and the of-site areas. They include the environmental surveillance and the associated support activities, such as dose calculations, and also the monitoring of environmental conditions to comply with federal and state environmental regulations on wildlife and cultural resources. These are called ''independent environmental programs'' in that they are conducted completely separate from site operations. The Environmental Surveillance and Oversight Program consists of the following projects: surface environmental surveillance; ground-water surveillance; wildlife resources monitoring; cultural resources; dose overview; radiation standards and calibrations; meteorological and climatological services; emergency preparedness

  10. Westinghouse Hanford Company environmental surveillance annual report

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Johnson, A.R.; McKinney, S.M.; Perkins, C.J.; Webb, C.R.

    1992-07-01

    This document presents the results of near-facility operational environmental monitoring in 1991 of the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State, as performed by Westinghouse Hanford Company. These activities are conducted to assess and to control the impacts of operations on the workers and the local environment and to monitor diffuse sources. Surveillance activities include sampling and analyses of ambient air, surface water, groundwater, sediments, soil, and biota. Also, external radiation measurements and radiological surveys are taken at waste disposal sites, radiologically controlled areas, and roads

  11. Hanford Site environmental surveillance data report for calendar year 1995

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1996-07-01

    Environmental surveillance at the Hanford Site collects data that provides a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River Water and Sediment. Pacific Northwest National Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1995 describes the Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. The report includes a summary of offsite and onsite environmental monitoring data collected during 1995 by PNNL's Environmental Monitoring Program. Appendix A of that report contains data summaries created from raw surface, river monitoring data, and chemical air data. This volume contains the actual raw data used to create the summaries. The data volume also includes Hanford Site drinking water radiological data

  12. Hanford Site environmental surveillance data report for calendar year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1996-07-01

    Environmental surveillance at the Hanford Site collects data that provides a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River Water and Sediment. Pacific Northwest National Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1995 describes the Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. The report includes a summary of offsite and onsite environmental monitoring data collected during 1995 by PNNL`s Environmental Monitoring Program. Appendix A of that report contains data summaries created from raw surface, river monitoring data, and chemical air data. This volume contains the actual raw data used to create the summaries. The data volume also includes Hanford Site drinking water radiological data.

  13. Health and Environment Linked for Information Exchange (HELIX)-Atlanta: A CDC-NASA Joint Environmental Public Health Tracking Collaborative Project

    Science.gov (United States)

    Al-Hamdan, Mohammad; Luvall, Jeff; Crosson, Bill; Estes, Maury; Limaye, Ashutosh; Quattrochi, Dale; Rickman, Doug

    2008-01-01

    HELIX-Atlanta was developed to support current and future state and local EPHT programs to implement data linking demonstration projects which could be part of the CDC EPHT Network. HELIX-Atlanta is a pilot linking project in Atlanta for CDC to learn about the challenges the states will encounter. NASA/MSFC and the CDC are partners in linking environmental and health data to enhance public health surveillance. The use of NASA technology creates value added geospatial products from existing environmental data sources to facilitate public health linkages. Proving the feasibility of the approach is the main objective

  14. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  15. Environmental surveillance of low-level radioactive waste management areas at Los Alamos during 1985

    International Nuclear Information System (INIS)

    1987-01-01

    This report was compiled as a part of the DOE-sponsored radioactive waste site surveillance program at Los Alamos National Laboratory. The report is a source document for data collected in 1985. However, an attempt is made to interpret the data as it relates to radionuclide transport to serve in guiding future waste site surveillance activities. This report contains information on one active and 11 inactive radioactive waste management areas at Los Alamos. Sections include the use history, current status, and future stabilization needs for all sites; the results of detailed surveillance activities at Areas G and C; and a dose evaluation based on the waste site and Laboratory environmental surveillance data. 9 refs., 30 figs., 13 tabs

  16. Ciguatera fish poisoning and environmental change: a case for strengthening health surveillance in the Pacific?

    Science.gov (United States)

    Derne, Bonnie; Fearnley, Emily; Goater, Sarah; Carter, Karen; Weinstein, Philip

    2010-09-01

    Ciguatera Fish Poisoning (CFP), a significant public health problem in the Pacific, is intrinsically linked to the health of coral reef ecosystems. Incidence data on CFP could therefore be used, in theory, as indicators of disruption to coral reefs. Some disruptions, such as increasing sea surface temperatures, result from global environmental change--therefore suggesting that CFP is likely to become an increasing public health problem in the region. The proactive management of increasing numbers of cases will depend on an understanding of the ecology of the disease, sound health surveillance systems to report cases of CFP including appropriate case definitions, and quantifiable correlations between case numbers and environmental variables. Here, we briefly review the knowledge about these components in Pacific Island Countries and Territories (PICTs), including summarising regional variation in symptoms of CFP cases, investigating media as an enhanced surveillance tool, and summarising regional environmental drivers of CFP cases. We conclude that CFP could be an important indicator of the health of reef ecosystems in the face of global climate change and more novel approaches such as combining environmental and health data, need to be implemented to improve surveillance of CFP.

  17. The insertion of the environmental health surveillance in the unified health system

    Directory of Open Access Journals (Sweden)

    Edenilo Baltazar Barreira Filho

    2012-03-01

    Full Text Available The integration of environmental monitoring activities in the Unified Health System (SUS shows some characteristics that differentiate it from the practice of epidemiological surveillance. This occurs mainly because much data on exposure to environmental factors is obtained outside the health sector and the adoption of actions that seek to control and/or prevent requires, in most cases, an intra andintersectoral understanding and articulation, since the health sector is not able, by itself, to provide answers to environmental health issues.In recent years, there has been an increasingly consolidation of the field of environmental health, which includes the area of public health, accustomed to scientific knowledge, to the formulation of public policies and the corresponding interventions (actions related to the interaction between human health and both natural and anthropic environmental factors, which determine, modulate and influence such interaction, in order to improve the quality of human life from the point of view of sustainability(1.As agreed at the Ist Seminar of the National Environmental Health, held in October 2005 and consolidated in the first National Conference on Environmental Health, held in December 2009, it is understood as an area of intersectoral and interdisciplinarypractice focused on the outcomes, in human health, of ecogeossocialrelations between man and environment(1.Accordingly, the Ministry of Health has been implementing, throughout the country, a Surveillance System in Environmental Health (SINVISA, seeking the improvement of this “model” of activities, establishing expertise into the three levels of government, aiming to consolidate the practice of Environmental Health within the SUS.Normative Instruction No. 1, March 7, 2005, creates SINVISA, establishes the area of action, the scope of the three levels of management within SUS and defines the Environmental Health Surveillance as a set of actions and services

  18. Thermoluminescent Dosimeter Use for Environmental Surveillance at the Hanford Site, 1971–2005

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, Ernest J.; Poston, Ted M.; Rathbone, Bruce A.

    2010-03-01

    This report describes the use of thermo luminescent dosimeters for environmental surveillance of external radiation on and around the Hanford Site for the period of 1970 to 2005. It addresses changes in the technology and associated quality control and assurance used in this work and summarizes the results of the 35 year period of external radiation surveillance. The appendices to this report provide trend plots for each location that comprised the shoreline, onsite, perimeter, and offsite sample design.

  19. Environmental radioactivity surveillance programme: results for UK for 1983

    International Nuclear Information System (INIS)

    Smith, D.M.; McAllister, G.; Welham, D.; Orr, D.

    1984-11-01

    The fourth report of a series giving the results of the NRPB's environmental radioactivity surveillance programme is presented. Samples of airborne dust, rainwater and milk are collected routinely throughout the UK; the concentrations of various radionuclides are measured and the resulting exposure of the population is evaluated. The radionuclides detected result predominantly from nuclear weapons testing in the atmosphere, although the programme would also be sensitive to other sources of environmental contamination. The annual average concentrations and depositions of radionuclides from fallout are now at the lowest levels since the inception of the Board's monitoring programme. The average annual effective dose equivalent from fallout is evaluated and compared with that from natural background radiation. (author)

  20. Environmental surveillance program. Quarterly progress report, July--September, 1993

    International Nuclear Information System (INIS)

    Walker, D.W.; Hall, L.F.; Downs, J.

    1996-01-01

    This report contains data developed from monitoring site measurements and laboratory analyses of environmental samples that were collected during the period of July-September, 1993. Because some laboratory procedures are lengthy and could adversely affect the desired timeliness of reports, results of some analyses from this time period will be included in the next quarterly report. Quarterly reports, then, will be routine periodic documents that present continually updated information concerning the potential presence of environmental contaminants in the vicinity of the Idaho National Engineering Laboratory (INEL). During the third calendar quarter of 1993, Environmental Surveillance Program (ESP) measurements did not reveal unexpected levels of contaminants in any environmental samples measured or analyzed. Most of the results reported in this document are related to off-site air and ground water measurements. Future reports will include results of monitoring at additional locations and for additional environmental materials. Annual reports from the ESP will contain data generated during the previous four calendar quarters, and will display measurement trends for various combinations of locations, contaminants and environmental media. The annual report will also include more interpretive material and discussions than will normally be found in quarterly reports

  1. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  2. Environmental surveillance results for 1995 for the Hazelwood Interim Storage Site

    International Nuclear Information System (INIS)

    McCague, J.C.

    1996-01-01

    This memorandum presents and interprets analytical results and measurements obtained as part of the 1995 environmental surveillance program for the Hazelwood Interim Storage Site (HISS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The discussion provides a comparative analysis of average historical background conditions and applicable regulatory criteria to the 1995 results reported for external gamma radiation and for samples from the media investigated (air, surface water, sediment, groundwater, and stormwater). Results from the 1995 environmental surveillance program at HISS indicate that, with the exception of thorium-230 in streambed sediment, applicable US Department of Energy (DOE) guidelines were not exceeded for any measured parameter or for any dose calculated for potentially exposed members of the general public. In the absence of sediment guidelines, DOE soil guidelines serve as a standard of comparison for data obtained from stream bed sediment; two samples from downstream locations contained concentrations of thorium-230 that exceeded DOE soil guidelines. All stormwater sample results were in compliance with permit-specified limits. Other radioactive materials include radium 226 and natural uranium

  3. SRS environmental air surveillance program 1954-2015: General trends

    Energy Technology Data Exchange (ETDEWEB)

    Abbott, K. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Jannik, T. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-06-02

    The radiological monitoring program at SRS was established under the DuPont Company in June 1951 and was used as a measurement of the effectiveness of plant controls and as an authoritative record of environmental conditions surrounding the plant. It also served as a method of demonstrating compliance with applicable federal regulations and guidance. This document serves as a general summary of changes made specifically to the environmental air monitoring program since its inception, and a discussion of the general trends seen in the air monitoring program at SRS from 1954 to 2015. Initially, the environmental air surveillance program focused not only on releases from SRS but also on fallout from various weapons testing performed through the end of 1978. Flypaper was used to measure the amount of fallout in the atmosphere during this period, and was present at each of the 10 monitoring stations. By 1959, all site stacks were included in the air monitoring program to determine their contribution to the airborne radioactivity onsite, and the number of air surveillance samplers rose to 18. This trend of an increased number of sampling locations continued to a peak of 35 sampling locations before shifting to a downward trend in the mid-1990s. In 1962, 4 outer-range samplers were placed in Savannah and Macon, GA, and in Greenville and Columbia, SC. Until 1976, air samplers were simply placed around the perimeter of the various operation locations (after 1959, this included stacks to determine their contribution to the airborne radioactivity), with the intent of creating as representative a distribution as possible of the air surrounding operations.

  4. Groundwater surveillance plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    Forstrom, J.M.; Smith, E.D.; Winters, S.L.; McMaster, W.M.

    1994-07-01

    US Department of Energy (DOE) Order 5400.1 requires the preparation of environmental monitoring plans and implementation of environmental monitoring programs for all DOE facilities. The order identifies two distinct components of environmental monitoring, namely effluent monitoring and environmental surveillance. In general, effluent monitoring has the objectives of characterizing contaminants and demonstrating compliance with applicable standards and permit requirements, whereas environmental surveillance has the broader objective of monitoring the effects of DOE activities on on- and off-site environmental and natural resources. The purpose of this document is to support the Environmental Monitoring Plan for the Oak Ridge Reservation (ORR) by describing the groundwater component of the environmental surveillance program for the DOE facilities on the ORR. The distinctions between groundwater effluent monitoring and groundwater surveillance have been defined in the Martin Marietta Energy Systems, Inc., Groundwater Surveillance Strategy. As defined in the strategy, a groundwater surveillance program consists of two parts, plant perimeter surveillance and off-site water well surveillance. This document identifies the sampling locations, parameters, and monitoring frequencies for both of these activities on and around the ORR and describes the rationale for the program design. The program was developed to meet the objectives of DOE Order 5400.1 and related requirements in DOE Order 5400.5 and to conform with DOE guidance on environmental surveillance and the Energy Systems Groundwater Surveillance Strategy

  5. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  6. Guidance for implementing the UMTRA Project long-term surveillance program

    International Nuclear Information System (INIS)

    1992-09-01

    The US Nuclear Regulatory Commission (NRC) has issued a general license for the custody and long-term care of US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project permanent disposal sites. The purpose of this general license is to ensure that the UMTRA disposal sites will be cared for in such a manner as to protect the public health and safety and the environment upon completion of remedial actions. The general license will be in effect for a disposal site when NRC accepts the disposal site long-term surveillance plan (LTSP) that meets the requirements of 10 CFR 40.27. The site LTSP describes in detail the long-term surveillance program, including any monitoring, maintenance, and emergency measures necessary to fulfill the conditions of the general license. This guidance document provides (1) instructions for preparing the disposal site LTSPs and (2) instructions for carrying out the UMTRA Project long-term surveillance program, including any monitoring that may be required. The information provided in this document also is in accordance with the regulatory requirements set forth in 40 CFR 192. On January 5, 1985, the US Tenth Circuit Court of Appeals remanded the groundwater standards, 40 CFR 192.02. Proposed groundwater standards were issued for comment on September 24, 1987 (52 FR 3600). When the groundwater standards become final, this document will be revised, as appropriate. This document also will be updated in response to any changes to 10 CFR 40, or in response to changes in the manner in which the long-term care of the licensed disposal sites is carried out

  7. Monitoring activities review of the Radiological Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Ritter, P.D.

    1992-03-01

    The 1992 Monitoring Activities Review (MAR) is directed at the Radiological Environment Surveillance Program (RESP) activities at the Radioactive Waste Management Complex (RWMC) of Idaho Engineering Laboratory (INEL). MAR panelists studied RESP documents and discussed their concerns with Environmental Monitoring Unit (EMU) staff and other panel members. These concerns were subsequently consolidated into a collection of recommendations with supporting discussions. Recommendations focus on specific monitoring activities, as well as the overall program. The MAR report also contains pertinent comments that should not require further action

  8. High Incidence of Mammalian Orthoreovirus Identified by Environmental Surveillance in Taiwan.

    Directory of Open Access Journals (Sweden)

    Matthew C Y Lim

    Full Text Available Wild poliovirus (WPV persists in diverse locales worldwide, spreading outward from endemic areas. In response to the international threat of WPV transmission and changes in the national vaccination policy, we established an environmental surveillance system to monitor the circulation of wild and vaccine-related poliovirus in Taiwan. From July 2012 to December 2013, we collected sewage specimens every month from 10 sewage treatment plants located throughout Taiwan. The specimens were concentrated by the two-phase separation method and then inoculated into L20B, RD, and A549 cells for virus isolation. Viral isolates were identified and serotyped by immunofluorescence assay or molecular analysis. A total of 300 sewage samples were collected, and the results showed 163 samples (54.3% were positive for virus, and 268 isolates were identified. Among these, 75 samples (25% were positive for enterovirus (EV, but no poliovirus was found. In addition, 92 isolates were identified as enteroviruses and the most common serotypes were coxsackievirus B4, coxsackievirus B3, and coxsackievirus B2. Interestingly, 102 (34% and 82 (27.3% specimens were positive for mammalian orthoreovirus (MRV and adenovirus, respectively. This study confirmed that sewage surveillance can be a useful additional modality for monitoring the possible presence of wild-type or vaccine-derived poliovirus in wastewater, and can indicate the current types of viruses circulating in the population. Furthermore, since MRV was found in children with acute necrotizing encephalopathy and meningitis, the high incidence of MRV detected by environmental surveillance warrants further investigation.

  9. A Belief Network Decision Support Method Applied to Aerospace Surveillance and Battle Management Projects

    National Research Council Canada - National Science Library

    Staker, R

    2003-01-01

    This report demonstrates the application of a Bayesian Belief Network decision support method for Force Level Systems Engineering to a collection of projects related to Aerospace Surveillance and Battle Management...

  10. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  11. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  12. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  13. Advancing environmental health surveillance in the US through a national human biomonitoring network.

    Science.gov (United States)

    Latshaw, Megan Weil; Degeberg, Ruhiyyih; Patel, Surili Sutaria; Rhodes, Blaine; King, Ewa; Chaudhuri, Sanwat; Nassif, Julianne

    2017-03-01

    The United States lacks a comprehensive, nationally-coordinated, state-based environmental health surveillance system. This lack of infrastructure leads to: • varying levels of understanding of chemical exposures at the state & local levels • often inefficient public health responses to chemical exposure emergencies (such as those that occurred in the Flint drinking water crisis, the Gold King mine spill, the Elk river spill and the Gulf Coast oil spill) • reduced ability to measure the impact of public health interventions or environmental policies • less efficient use of resources for cleaning up environmental contamination Establishing the National Biomonitoring Network serves as a step toward building a national, state-based environmental health surveillance system. The Network builds upon CDC investments in emergency preparedness and environmental public health tracking, which have created advanced chemical analysis and information sharing capabilities in the state public health systems. The short-term goal of the network is to harmonize approaches to human biomonitoring in the US, thus increasing the comparability of human biomonitoring data across states and communities. The long-term goal is to compile baseline data on exposures at the state level, similar to data found in CDC's National Report on Human Exposure to Environmental Chemicals. Barriers to success for this network include: available resources, effective risk communication strategies, data comparability & sharing, and political will. Anticipated benefits include high quality data on which to base public health and environmental decisions, data with which to assess the success of public health interventions, improved risk assessments for chemicals, and new ways to prioritize environmental health research. Copyright © 2016 Elsevier GmbH. All rights reserved.

  14. Co-ordinated research and environmental surveillance programme related to sea disposal of radioactive waste

    International Nuclear Information System (INIS)

    1984-01-01

    Sea disposal operations of packaged low-level radioactive waste are carried out under the provisions of the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter, also referred to as the London Dumping Convention. The environmental impact of this disposal method is continuously kept under review, in particular within the IAEA which has provided the ''Definition of High-Level Radioactive Waste or Other High-Level Radioactive Matter Unsuitable for Dumping at Sea'' for the purpose of the Convention and within the OECD-NEA in the framework of its Multilateral Consultation and Surveillance Mechanism for Sea Dumping of Radioactive Waste. The NEA Co-Ordinated Research and Environmental Surveillance Programme (CRESP) is focussed on the actual North-East Atlantic dump site. Its objective is to increase the available scientific data base related to the oceanographic and biological characteristics of the dump site and elaborate a site specific model of the transfers of radionuclides to human populations. Future site suitability reviews, as periodically requested under the terms of the Multilateral Consultation and Surveillance Mechanism, will therefore be based on a more accurate and comprehensive scientific basis

  15. Environmental-surveillance report for the Nevada Test Site (January 1982 through December 1982)

    International Nuclear Information System (INIS)

    Scoggins, W.A.

    1983-06-01

    This report documents the environmental surveillance program at the Nevada Test Site as conducted from January 1982 through December 1982. The results and evaluations of measurements of radioactivity in air and water, and of direct gamma radiation exposure rates are presented. Relevancy to DOE concentration guides (CG's) is established

  16. Statistical distributions as applied to environmental surveillance data

    International Nuclear Information System (INIS)

    Speer, D.R.; Waite, D.A.

    1976-01-01

    Application of normal, lognormal, and Weibull distributions to radiological environmental surveillance data was investigated for approximately 300 nuclide-medium-year-location combinations. The fit of data to distributions was compared through probability plotting (special graph paper provides a visual check) and W test calculations. Results show that 25% of the data fit the normal distribution, 50% fit the lognormal, and 90% fit the Weibull.Demonstration of how to plot each distribution shows that normal and lognormal distributions are comparatively easy to use while Weibull distribution is complicated and difficult to use. Although current practice is to use normal distribution statistics, normal fit the least number of data groups considered in this study

  17. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  18. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  19. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  20. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  1. Environmental surveillance report for the Nevada Test Site (January 1980-December 1980)

    International Nuclear Information System (INIS)

    Scoggins, W.A.

    1981-01-01

    Results are presented for the environmental surveillance program at the Nevada Test Site as conducted by the Department of Energy (DOE) onsite radiological safety contractor from January 1980 through December 1980. The results and evaluations of measurements of radioactivity in air and water, and of direct gamma radiation exposure rates are presented. Relevancy to DOE concentration guides (CG'S) is established

  2. Environmental surveillance for EG ampersand G Idaho Waste Management facilities at the Idaho National Engineering Laboratory. 1993 annual report

    International Nuclear Information System (INIS)

    Wilhelmsen, R.N.; Wright, K.C.; McBride, D.W.; Borsella, B.W.

    1994-08-01

    This report describes calendar year 1993 environmental surveillance activities of Environmental Monitoring of EG ampersand G Idaho, Inc., performed at EG ampersand G Idaho operated Waste Management facilities at the Idaho National Engineering Laboratory (INEL). The major facilities monitored include the Radioactive Waste Management Complex, the Waste Experimental Reduction Facility, the Mixed Waste Storage Facility, and two surplus facilities. Included are results of the sampling performed by the Radiological and Environmental Sciences Laboratory and the United States Geological Survey. The primary purposes of monitoring are to evaluate environmental conditions, to provide and interpret data, to ensure compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1993 environmental surveillance data with US Department of Energy derived concentration guides and with data from previous years

  3. Annual report -- 1992: Environmental surveillance for EG ampersand G Idaho Waste Management Facilities at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Wilhelmsen, R.N.; Wright, K.C.; McBride, D.W.

    1993-08-01

    This report describes the 1992 environmental surveillance activities of the Environmental Monitoring Unit of EG ampersand G Idaho, Inc., at EG ampersand G Idaho-operated Waste Management facilities at the Idaho National Engineering Laboratory (INEL). The major facilities monitored include the Radioactive Waste Management Complex, the Waste Experimental Reduction Facility, the Mixed Waste Storage Facility, and two surplus facilities. Included are some results of the sampling performed by the Radiological and Environmental Sciences Laboratory and the United States Geological Survey. The primary purposes of monitoring are to evaluate environmental conditions, to provide and interpret data, to ensure compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1992 environmental surveillance data with DOE derived concentration guides, and with data from previous years

  4. Surveillance and Critical Theory

    Directory of Open Access Journals (Sweden)

    Christian Fuchs

    2015-09-01

    Full Text Available In this comment, the author reflects on surveillance from a critical theory approach, his involvement in surveillance research and projects, and the status of the study of surveillance. The comment ascertains a lack of critical thinking about surveillance, questions the existence of something called “surveillance studies” as opposed to a critical theory of society, and reflects on issues such as Edward Snowden’s revelations, and Foucault and Marx in the context of surveillance.

  5. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes

  6. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  7. Surveillance Plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-12-01

    This Surveillance Plan has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model The baseline monitoring phase is expected to begin in 1994 and continue for 12--18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC The routine annual monitoring phase will continue for ∼4 years after completion of the baseline monitoring phase. This Surveillance Plan presents the technical and quality assurance surveillance activities for the various WAG 6 environmental monitoring and data evaluation plans and implementing procedures

  8. Soil and vegetation surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, E.J.

    1995-06-01

    Soil sampling and analysis evaluates long-term contamination trends and monitors environmental radionuclide inventories. This section of the 1994 Hanford Site Environmental Report summarizes the soil and vegetation surveillance programs which were conducted during 1994. Vegetation surveillance is conducted offsite to monitor atmospheric deposition of radioactive materials in areas not under cultivation and onsite at locations adjacent to potential sources of radioactivity.

  9. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed

  10. Removing a barrier to computer-based outbreak and disease surveillance--the RODS Open Source Project.

    Science.gov (United States)

    Espino, Jeremy U; Wagner, M; Szczepaniak, C; Tsui, F C; Su, H; Olszewski, R; Liu, Z; Chapman, W; Zeng, X; Ma, L; Lu, Z; Dara, J

    2004-09-24

    Computer-based outbreak and disease surveillance requires high-quality software that is well-supported and affordable. Developing software in an open-source framework, which entails free distribution and use of software and continuous, community-based software development, can produce software with such characteristics, and can do so rapidly. The objective of the Real-Time Outbreak and Disease Surveillance (RODS) Open Source Project is to accelerate the deployment of computer-based outbreak and disease surveillance systems by writing software and catalyzing the formation of a community of users, developers, consultants, and scientists who support its use. The University of Pittsburgh seeded the Open Source Project by releasing the RODS software under the GNU General Public License. An infrastructure was created, consisting of a website, mailing lists for developers and users, designated software developers, and shared code-development tools. These resources are intended to encourage growth of the Open Source Project community. Progress is measured by assessing website usage, number of software downloads, number of inquiries, number of system deployments, and number of new features or modules added to the code base. During September--November 2003, users generated 5,370 page views of the project website, 59 software downloads, 20 inquiries, one new deployment, and addition of four features. Thus far, health departments and companies have been more interested in using the software as is than in customizing or developing new features. The RODS laboratory anticipates that after initial installation has been completed, health departments and companies will begin to customize the software and contribute their enhancements to the public code base.

  11. Surveillance of poliomyelitis in Northern Italy: Results of acute flaccid paralysis surveillance and environmental surveillance, 2012-2015.

    Science.gov (United States)

    Pellegrinelli, Laura; Bubba, Laura; Primache, Valeria; Pariani, Elena; Battistone, Andrea; Delogu, Roberto; Fiore, Stefano; Binda, Sandro

    2017-02-01

    Although in the last years poliovirus (PV) transmission has been reported at the lowest levels ever recorded, the spread of virus from endemic countries endures; the high levels of immigration flows across the Mediterranean Sea jeopardize Italy for PV reintroduction. The World Health Organization (WHO) strategic plan for global poliomyelitis (polio) eradication indicates the nationwide surveillance of Acute Flaccid Paralysis (AFP) as the gold standard for detecting cases of polio. In addition, the Environmental Surveillance (ES), seeking the presence of PV and Non-Polio Enterovirus (NPEV) in sewage, is recognized as a powerful tool to confirm PV circulation in absence of AFP cases, especially in polio-free countries. Here we report the results of AFP surveillance (AFPS) and ES in Lombardy (Northern Italy) from 2012 to 2015. Forty-eight AFP cases were identified during the study period. No AFP case was caused by PV infection. NPEVs were identified in 6.3% (3/48) of AFP cases. The annual AFP incidence rate was 0.87/100'000 children <15 y in 2012, 1.42/100'000 in 2013, 1.02/100'000 in 2014, and 0.47/100'000 in 2015; according to WHO indicators, the sensitivity of AFPS was adequate in 2013 and 2014. Completeness of case investigation raised progressively during the study period to achieve the WHO standards in 2014 (92.3%) and 2015 (100%). Completeness of follow-up increased from 72.7% in 2012 to 100% in 2014. In the framework of the ES conducted in Milan, 268 wastewater samples were collected from 2012 to 2015 and no PVs were isolated. In contrast, NPEVs were detected in 65.3% (175/268) of samples. All NPEVs characterized belonged to enterovirus species B: echovirus type 11, 6 and 3 were the most frequently detected viruses, representing 29.1% (41/141), 20.6% (29/141) and 9.2% (13/141) of genotyped NPEVs, respectively. Keeping strong and encouraging both AFPS and ES is crucial to ensure that PV will not return unnoticed in Italy - as well as in other polio

  12. An overview of the Environmental Response Team's air surveillance procedures at emergency response activities

    Energy Technology Data Exchange (ETDEWEB)

    Turpin, R.D.; Campagna, P.R. (U.S. Environmental Protection Agency, Edison, NJ (USA))

    The Safety and Air Surveillance Section of the United States Environmental Protection Agency's Environmental Response Team responds to emergency air releases such as tire fires and explosions. The air surveillance equipment and procedures used by the organization are described, and case studies demonstrating the various emergency response activities are presented. Air response activities include emergency air responses, occupational and human health air responses and remedial air responses. Monitoring and sampling equipment includes photoionization detectors, combustible gas meters, real-time aerosol monitors, personal sampling pumps, and high flow pumps. Case histories presented include disposal of dioxane from a cotton plant, response to oil well fires in Kuwait, disposal of high pressure cylinders in American Samoa, and response to hurricane Hugo. 3 refs., 1 tab.

  13. Environmental hardening of robots for nuclear maintenance and surveillance tasks

    International Nuclear Information System (INIS)

    Hintenlang, D.E.; Tulenko, J.S.; Wheeler, R.; Roy, T.

    1990-01-01

    The University of Florida, in cooperation with the Universities of Texas, Tennessee, and Michigan and Oak Ridge National Laboratory, is developing an advanced robotic system for the US Department of Energy under the University Program for Robotics for Advanced Reactors. As part of this program, the University of Florida has been pursuing the development of environmentally hardened components so that autonomous robotic systems can successfully carry out their tasks under the most extreme expected environmental conditions. This requirement means that the designed robotic system with its onboard computer-based intelligence must be able to successfully complete tasks in toxic, radioactive, wet, temperature extremes, and other physically impairing environments. As part of this program, a study was carried out to determine the environmental conditions that should be set as the design criteria for robotic systems to maintain reasonable operations for nuclear plants in the course of maintenance, testing, and surveillance under all conditions, including plant upset. It was decided that Florida would build a combined environmental testing facility to test specific devices in high-radiation/high-temperature combined environments. This environmental test chamber has been built and successfully tested to over 250 degree F. This facility will provide some of the first combined temperatures/radiation data for many large-scale integrated components

  14. Environmental surveillance report for the Nevada Test Site (January 1981 through December 1981)

    International Nuclear Information System (INIS)

    Scoggins, W.A.

    1982-05-01

    This report documents the environmental surveillance program at the Nevada Test Site as conducted by the Department of Energy (DOE) onsite radiological safety contractor from January 1981 through December 1981. The results and evaluations of measurements of radioactivity in air and water, and of direct gamma radiation exposure rates are presented. Relevancy to DOE concentration guides (CG'S) is established

  15. The insertion of the environmental health surveillance in the unified health system - 10.5020/18061230.2012.p1

    Directory of Open Access Journals (Sweden)

    Edenilo Baltazar Barreira Filho

    2012-03-01

    Full Text Available The integration of environmental monitoring activities in the Unified Health System (SUS shows some characteristics that differentiate it from the practice of epidemiological surveillance. This occurs mainly because much data on exposure to environmental factors is obtained outside the health sector and the adoption of actions that seek to control and/or prevent requires, in most cases, an intra andintersectoral understanding and articulation, since the health sector is not able, by itself, to provide answers to environmental health issues.In recent years, there has been an increasingly consolidation of the field of environmental health, which includes the area of public health, accustomed to scientific knowledge, to the formulation of public policies and the corresponding interventions (actions related to the interaction between human health and both natural and anthropic environmental factors, which determine, modulate and influence such interaction, in order to improve the quality of human life from the point of view of sustainability(1.As agreed at the Ist Seminar of the National Environmental Health, held in October 2005 and consolidated in the first National Conference on Environmental Health, held in December 2009, it is understood as an area of intersectoral and interdisciplinarypractice focused on the outcomes, in human health, of ecogeossocialrelations between man and environment(1.Accordingly, the Ministry of Health has been implementing, throughout the country, a Surveillance System in Environmental Health (SINVISA, seeking the improvement of this “model” of activities, establishing expertise into the three levels of government, aiming to consolidate the practice of Environmental Health within the SUS.Normative Instruction No. 1, March 7, 2005, creates SINVISA, establishes the area of action, the scope of the three levels of management within SUS and defines the Environmental Health Surveillance as a set of actions and services

  16. The insertion of the environmental health surveillance in the unified health system - 10.5020/18061230.2012.p3

    Directory of Open Access Journals (Sweden)

    Edenilo Baltazar Barreira Filho

    2012-03-01

    Full Text Available The integration of environmental monitoring activities in the Unified Health System (SUS shows some characteristics that differentiate it from the practice of epidemiological surveillance. This occurs mainly because much data on exposure to environmental factors is obtained outside the health sector and the adoption of actions that seek to control and/or prevent requires, in most cases, an intra andintersectoral understanding and articulation, since the health sector is not able, by itself, to provide answers to environmental health issues.In recent years, there has been an increasingly consolidation of the field of environmental health, which includes the area of public health, accustomed to scientific knowledge, to the formulation of public policies and the corresponding interventions (actions related to the interaction between human health and both natural and anthropic environmental factors, which determine, modulate and influence such interaction, in order to improve the quality of human life from the point of view of sustainability(1.As agreed at the Ist Seminar of the National Environmental Health, held in October 2005 and consolidated in the first National Conference on Environmental Health, held in December 2009, it is understood as an area of intersectoral and interdisciplinarypractice focused on the outcomes, in human health, of ecogeossocialrelations between man and environment(1.Accordingly, the Ministry of Health has been implementing, throughout the country, a Surveillance System in Environmental Health (SINVISA, seeking the improvement of this “model” of activities, establishing expertise into the three levels of government, aiming to consolidate the practice of Environmental Health within the SUS.Normative Instruction No. 1, March 7, 2005, creates SINVISA, establishes the area of action, the scope of the three levels of management within SUS and defines the Environmental Health Surveillance as a set of actions and services

  17. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  18. FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-11-01

    The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments

  19. Savannah River Site environmental report for 1997 summary

    International Nuclear Information System (INIS)

    Arnett, M.

    1997-01-01

    The Savannah River Site (SRS) publishes an environmental report each year to provide environmental monitoring and surveillance results to the US Department of Energy (DOE), the public, Congress, state and federal regulators, universities, local governments, the news media, and environmental and civic groups. The Savannah River Site Environmental Report for 1997 (WSRC-TR-97-00322) contains detailed information on site operations, environmental monitoring and surveillance programs, environmental compliance activities, and special projects for calendar year 1997. The purpose of this document is to give a brief overview of the site and its activities, to summarize the site environmental report and the impact of 1997 SRS operations on the environment and the public, and to provide a brief explanation of radiation and dose

  20. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  1. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  2. Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment. Research project

    International Nuclear Information System (INIS)

    Martorell, S.; Serradell, V.; Munoz, A.; Sanchez, A.

    1997-01-01

    Background, objective, scope, detailed working plan and follow-up and final product of the project ''Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment'' are described

  3. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  4. National Status and Trends, Benthic Surveillance Project Sites, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set reports information regarding the nominal sampling locations for the National Status and Trends Benthic Surveillance Project sites. One record is...

  5. RENDAC: Integrated System Data for the Information Control the Environmental Radiological Surveillance the National Network in Cuban Republic

    International Nuclear Information System (INIS)

    Valdes Ramos, M.; Prendes Alonso, M.

    1998-01-01

    With the objective to evaluate, process, control and to store the information that is generated in the National Environmental Radiological Surveillance Network, it is designed and I program the on-line RENDAC system that allows to capture and evaluate the parameters that characterize the environmental radiological situation

  6. Environmental monitoring of the Cea Valduc centre; La surveillance environnementale du site du CEAValduc

    Energy Technology Data Exchange (ETDEWEB)

    Guetat, Ph. [CEA Valduc, Dir. adjoint, 21 - Is-sur-Tille (France); Jaskula, L. [CEA Valduc, service de protection contre les rayonnements, 21 - Is-sur-Tille (France)

    2010-06-15

    This paper describes the main features of the environmental control in the vicinity of the CEA Valduc centre, explains the site specific characteristics, the surveillance policy, and some historical elements about tritium atmospheric release. Some levels of activities are given, corresponding to an exposure level below 0.02% of natural irradiation. (author)

  7. Program of environmental radiological surveillance of the radioactive wastes storage center of Maquixco in the period January-December 1991

    International Nuclear Information System (INIS)

    Gaso P, M.I.

    1991-12-01

    The primary objective of all program of environmental radiological surveillance (PVRA), it is to follow the evolution of the radioactive content of the links of the chains that constitute the different ways of transfer of the radioactivity toward the man, with the purpose of making a realistic evaluation of the environmental impact produced by the installation under surveillance. In the CADER in Mexico, only accidents or escapes of radioactivity of slow evolution can be detected. At the moment the radioactive wastes in this installation are not treated. In this report the results obtained during the year 1991 are presented. (Author)

  8. Savannah River Site environmental report for 1996 summary

    International Nuclear Information System (INIS)

    Arnett, M.W.

    1997-01-01

    The Savannah River Site (SRS) publishes an environmental report each year to provide environmental monitoring and surveillance results to the US department of Energy (DOE), the public, Congress, state and federal regulators, universities, local governments, the news media, environmental and civic groups. The Savannah River Site Environmental Report for 1996 (WSRC-TR-97-0171) contains detailed information on site operations, environmental monitoring and surveillance programs, environmental compliance activities, and special projects for the calendar year 1996. The purpose of this document is to give a brief overview of the site and its activities, to summarize the report and the impact of 1996 SRS operations on the environment and the public, and to provide a brief explanation of radiation and dose

  9. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  10. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  11. Environmental surveillance for the INEL radioactive waste management complex. Annual report, 1979

    International Nuclear Information System (INIS)

    Wickham, L.E.; Janke, D.H.

    1980-12-01

    This document is the 1979 annual environmental surveillance report for the Radioactive Waste Management Complex (RWMC) of the Idaho National Engineering Laboratory. Included are tabulated data from and discussions about routine radiological monitoring of atmospheric, hydrologic, geologic, and biotic environments of the RWMC. Also included are discussions of selected nonradiological pollutants (e.g., sodium, etc.). It is concluded that (a) RWMC operations have not adversely affected local, existing environments; (b) environmental conditions within the Transuranic Storage Area are not corrosive enough to adversely affect transuranic waste storage containers, and (c) the addition of lakebed soil to pit, trench, and soil test plot areas has altered the moisture cycle characteristic of RWMC soil

  12. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  13. Transport Infrastructure Surveillance and Monitoring by Electromagnetic Sensing: The ISTIMES Project

    Directory of Open Access Journals (Sweden)

    Marie Bost

    2010-11-01

    Full Text Available The ISTIMES project, funded by the European Commission in the frame of a joint Call “ICT and Security” of the Seventh Framework Programme, is presented and preliminary research results are discussed. The main objective of the ISTIMES project is to design, assess and promote an Information and Communication Technologies (ICT-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring of critical transport infrastructures. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance and real time data imaging of the critical transport infrastructures. The project exploits different non-invasive imaging technologies based on electromagnetic sensing (optic fiber sensors, Synthetic Aperture Radar satellite platform based, hyperspectral spectroscopy, Infrared thermography, Ground Penetrating Radar-, low-frequency geophysical techniques, Ground based systems for displacement monitoring. In this paper, we show the preliminary results arising from the GPR and infrared thermographic measurements carried out on the Musmeci bridge in Potenza, located in a highly seismic area of the Apennine chain (Southern Italy and representing one of the test beds of the project.

  14. Strengthening laboratory capacity through the surveillance of rotavirus gastroenteritis in Central Africa: the Surveillance Épidémiologique en Afrique Centrale (SURVAC) Project.

    Science.gov (United States)

    Waku-Kouomou, Diane; Esona, Mathew D; Pukuta, Elizabeth; Gouandijka-Vasilache, Ionela; Boula, Angeline; Dahl, Benjamin A; Mondonge, Vital; Mekontso, David; Guifara, Gilbert; Mbary-Daba, Regis; Lewis, Jamie; Yahaya, Ali Ahmed; Mwenda, Jason M; Cavallaro, Kathleen F; Gody, Jean Chrysostome; Muyembe, Jean-Jacques; Koki-Ndombo, Paul; Bowen, Michael D

    2016-01-01

    The goal of the SURVAC pilot project was to strengthen disease surveillance and response in three countries; Cameroon (CAE), Democratic Republic of the Congo (DRC) and Central African Republic (CAR). Seven laboratories involved in rotavirus surveillance were provided with equipment, reagents and supplies. CDC and WHO staff provided on-site classroom and bench training in biosafety, quality assurance, quality control (QC), rotavirus diagnosis using Enzyme Immunoassay (EIA) and genotyping of rotavirus strains using the Reverse Transcription Polymerase-chain reaction (RT-PCR). All laboratory data were reported through WHO/AFRO. Twenty-three staff members were trained on RT-PCR for rotavirus genotyping which was introduced for the first time in all three countries. In CAE, the number of samples analysed by EIA and RT-PCR increased tenfold between 2007 and 2013. In DRC, this number increased fivefold, from 2009 to 2013 whereas in CAR, it increased fourfold between 2011 and 2013. All laboratories passed WHO proficiency testing in 2014. Laboratory capacity was strengthened through equipping laboratories and strengthening a subregional laboratory workforce for surveillance of rotavirus gastroenteritis. Each of the three countries generated rotavirus surveillance and genotyping data enabling the mapping of circulating genotypes. These results will help monitor the impact of rotavirus vaccination in these countries. © 2015 John Wiley & Sons Ltd.

  15. Environmental surveillance for the INEL Radioactive-Waste-Management complex. Annual report 1981

    International Nuclear Information System (INIS)

    Janke, D.H.; Zahn, T.P.

    1982-09-01

    The 1981 environmental surveillance report for the Radioactive Waste Management Complex of the Idaho National Engineering Laboratory contains data and discussions about routine radiological monitoring of the atmospheric, hydrologic, and geologic environments of the RWMC. Additional discussions include results of routine monitoring of two surplus facilities, the Stationary Low-Power Reactor No. 1 Surplus Area and the Organic Moderated Reactor Experiment. Each area has produced localized effects on the environment, but containment is well within the INEL site boundary

  16. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  17. 10 Steps to Building an Architecture for Space Surveillance Projects

    Science.gov (United States)

    Gyorko, E.; Barnhart, E.; Gans, H.

    Space surveillance is an increasingly complex task, requiring the coordination of a multitude of organizations and systems, while dealing with competing capabilities, proprietary processes, differing standards, and compliance issues. In order to fully understand space surveillance operations, analysts and engineers need to analyze and break down their operations and systems using what are essentially enterprise architecture processes and techniques. These techniques can be daunting to the first- time architect. This paper provides a summary of simplified steps to analyze a space surveillance system at the enterprise level in order to determine capabilities, services, and systems. These steps form the core of an initial Model-Based Architecting process. For new systems, a well defined, or well architected, space surveillance enterprise leads to an easier transition from model-based architecture to model-based design and provides a greater likelihood that requirements are fulfilled the first time. Both new and existing systems benefit from being easier to manage, and can be sustained more easily using portfolio management techniques, based around capabilities documented in the model repository. The resulting enterprise model helps an architect avoid 1) costly, faulty portfolio decisions; 2) wasteful technology refresh efforts; 3) upgrade and transition nightmares; and 4) non-compliance with DoDAF directives. The Model-Based Architecting steps are based on a process that Harris Corporation has developed from practical experience architecting space surveillance systems and ground systems. Examples are drawn from current work on documenting space situational awareness enterprises. The process is centered on DoDAF 2 and its corresponding meta-model so that terminology is standardized and communicable across any disciplines that know DoDAF architecting, including acquisition, engineering and sustainment disciplines. Each step provides a guideline for the type of data to

  18. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  19. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NS&T) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  20. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NSandT) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  1. Environmental surveillance data report for the first quarter of 1986

    International Nuclear Information System (INIS)

    1986-07-01

    The Department of Environmental Management (DEM) within the Environmental and Occupational Safety Division (E and OS) at the Oak Ridge National Laboratory (ORNL) is responsible for environmental surveillance to: (1) assure compliance with all Federal, State, and local standards for the prevention, control, and abatement of environmental pollution, (2) monitor the adequacy of containment and effluent controls, and (3) assess impacts on the environment of releases from ORNL facilities. During 1986, the Low-Level Counting Facility at ORNL began reporting radionuclide measurements in a manner different from that of previous years. Prior to 1986, data below the minimum detectable limit were reported as ''less than (<)'' the detection limit. This year, results that are negative (samples less than instrument background) are reported. If these data are compared to previous years, it will appear that average values for 1986 have decreased. Apparent decreases may be attributed to the reporting of negative values and the subsequent averaging of this data. Nonradionuclide results that are below the analytical detection limit are expressed as less than (<) the limit. In computing average values, sample results below the limit are assigned the limit, and the resulting average value is expressed as less than the computed value. The Four-Plant Analytical Committee is reviewing the standardization of reporting of less than detectable values. Their recommendations will be incorporated in these reports as they become policy

  2. Savannah River Site Environmental Report for 1997 Summary

    International Nuclear Information System (INIS)

    Arnett, M.

    1998-01-01

    The Savannah River Site (SRS) publishes an environmental report each year to provide environmental monitoring and surveillance results to the U. S. Department of Energy (DOE), the public, Congress, state and federal regulators, universities, local governments, the news media, and environmental and civic groups. The Savannah River Site Environmental Report for 1997 (WSRC-TR-97-00322) contains detailed information on site operations, environmental monitoring and surveillance programs, environmental compliance activities, and special projects for the calendar year 1997. The purpose of this documents is to give a brief overview of the site and its activities, to summarize the site environmental report and the impact of 1997 SRS operations on the environment and the public, and to provide a brief explanation of radiation and dose.The data used to compile the annual environmental report and this summary can be found in Savannah River Site Environmental Data for 1997 (WSRC-TR-97-00324)

  3. Environmental surveillance and research at the Nevada Test Site: The beginning and the rationale

    International Nuclear Information System (INIS)

    Elle, D.R.; Church, B.W.; Bingham, F.E.

    1990-01-01

    Concurrently with the first nuclear-weapons tests at the Nevada Test Site (NTS) in 1951, an environmental surveillance and monitoring program was established offsite. Initial emphasis was on tracking fallout clouds and measuring external radiation exposure rates. An environmental research program was also initiated. Establishment of comprehensive programs has facilitated the ability to address issues such as the inventory and distribution of radionuclides in surface soils, reconstruction of offsite population doses, and recognition of areas requiring additional information. We have learned that a successful environmental monitoring program must be flexible and responsive to change; must address public as well as technical and regulatory concerns; and results must be continuously interpreted to ensure that all pathways are considered and the programs are proactive in their approach

  4. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  5. Recommendations to the NRC for review criteria for alternative methods of low-level radioactive waste disposal: Environmental monitoring and surveillance programs

    International Nuclear Information System (INIS)

    Denham, D.H.; Stenner, R.D.; Eddy, P.A.; Jaquish, R.E.; Ramsdell, J.V. Jr.

    1988-07-01

    Licensing of a facility for low-level radioactive waste disposal requires the review of the environmental monitoring and surveillance programs. A set of review criteria is recommended for the US Nuclear Regulatory Commission (NRC) staff to use in each monitoring phase---preoperational, operational, and post operational---for evaluating radiological and selected nonradiological parameters in proposed environmental monitoring and surveillance programs at low-level waste disposal facilities. Applicable regulations, industry standards, and technical guidance on low-level radioactive waste are noted throughout the document. In the preoperational phase, the applicant must demonstrate that the environmental monitoring program identifies radiation levels and radionuclide concentrations at the site and also provides adequate basic data on the disposal site. Data recording and statistical analyses for this phase are addressed

  6. Routine Radiological Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs

  7. Electronic health record case studies to advance environmental public health tracking.

    Science.gov (United States)

    Namulanda, Gonza; Qualters, Judith; Vaidyanathan, Ambarish; Roberts, Eric; Richardson, Max; Fraser, Alicia; McVeigh, Katharine H; Patterson, Scott

    2018-03-01

    Data from traditional public health surveillance systems can have some limitations, e.g., timeliness, geographic level, and amount of data accessible. Electronic health records (EHRs) could present an opportunity to supplement current sources of routinely collected surveillance data. The National Environmental Public Health Tracking Program (Tracking Program) sought to explore the use of EHRs for advancing environmental public health surveillance practices. The Tracking Program funded four state/local health departments to obtain and pilot the use of EHR data to address several issues including the challenges and technical requirements for accessing EHR data, and the core data elements required to integrate EHR data within their departments' Tracking Programs. The results of these pilot projects highlighted the potential of EHR data for public health surveillance of rare diseases that may lack comprehensive registries, and surveillance of prevalent health conditions or risk factors for health outcomes at a finer geographic level. EHRs therefore, may have potential to supplement traditional sources of public health surveillance data. Published by Elsevier Inc.

  8. Radiological surveillance of Remedial Action activities at the processing site, Falls City, Texas. Final report

    International Nuclear Information System (INIS)

    1993-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project's Technical Assistance Contractor (TAC) performed a radiological surveillance of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site in Falls City, Texas. This surveillance was conducted March 22--26, 1993. No findings were identified during the surveillance. Three site-specific observations and three programmatic observations are presented in this report. The overall conclusion from the surveillance is that the radiological aspects of the Falls City, Texas, remedial action program are performed adequately. However, some of the observations identify that there is potential for improving certain aspects of the occupational radiological air sampling, ensuring analytical data quality, and in communicating with the DOE and TAC on the ore sampling methods. The TAC has also received and is currently reviewing the RAC's responses regarding the observations identified during the radiological surveillance performed October 29--30, 1992

  9. The use of animals as a surveillance tool for monitoring environmental health hazards, human health hazards and bioterrorism.

    Science.gov (United States)

    Neo, Jacqueline Pei Shan; Tan, Boon Huan

    2017-05-01

    This review discusses the utilization of wild or domestic animals as surveillance tools for monitoring naturally occurring environmental and human health hazards. Besides providing early warning to natural hazards, animals can also provide early warning to societal hazards like bioterrorism. Animals are ideal surveillance tools to humans because they share the same environment as humans and spend more time outdoors than humans, increasing their exposure risk. Furthermore, the biologically compressed lifespans of some animals may allow them to develop clinical signs more rapidly after exposure to specific pathogens. Animals are an excellent channel for monitoring novel and known pathogens with outbreak potential given that more than 60 % of emerging infectious diseases in humans originate as zoonoses. This review attempts to highlight animal illnesses, deaths, biomarkers or sentinel events, to remind human and veterinary public health programs that animal health can be used to discover, monitor or predict environmental health hazards, human health hazards, or bioterrorism. Lastly, we hope that this review will encourage the implementation of animals as a surveillance tool by clinicians, veterinarians, ecosystem health professionals, researchers and governments. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  10. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  11. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  12. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program

  13. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  14. Do environmental projects promote gender equity?

    Science.gov (United States)

    Joekes, S

    1995-02-01

    In the 1980s, governments and development agencies began to recognize the need to consider gender issues in their environmental and natural resource management programs. First came the understanding that women play a vital role in the management of natural resources and often have a strong traditional and contemporary knowledge of their environment. To exclude them would damage the efficacy of any project. Next, donor agencies came to view women, in their roles as environmental managers, as vulnerable victims of and contributors to environmental degradation. When awareness grew of examples of women successfully fighting to conserve local resources, women were considered important local assets to be used in efforts toward better environmental management. New environmental projects began by asking whether the protected resource was used by men or women in order to target the crucial people. For example, when planning to preserve forests, it is useful to recognize that men typically use wood for construction and fencing, while women use it for cooking fires. It has become increasingly common for women to participate in water and sanitation committees. But good intentions have often been subverted. Community level management of environmental projects does not guarantee female participation. Sometimes involving women means that women do all the physical labor without receiving their fair share of the benefits. In areas where women's property rights are restricted, women will have little authority in resource management. Legal reforms are needed, but they must be complemented at the local level by collective action.

  15. Detection of multiple cocirculating wild poliovirus type 1 lineages through environmental surveillance: impact and progress during 2011-2013 in Pakistan.

    Science.gov (United States)

    Alam, Muhammad Masroor; Shaukat, Shahzad; Sharif, Salmaan; Angez, Mehar; Khurshid, Adnan; Malik, Farzana; Rehman, Lubna; Zaidi, Syed Sohail Zahoor

    2014-11-01

    The environmental surveillance has proven to be a useful tool to identify poliovirus circulation in different countries and was started in Pakistan during July 2009 to support the acute flaccid paralysis (AFP) surveillance system. Sewage samples were collected from 27 environmental sampling (ENV) sites and processed for poliovirus isolation through 2-phase separation method. Poliovirus isolates were identified as Sabin-like or wild type through real-time polymerase chain reaction (PCR). Wild-type strains were subjected to VP1 gene sequencing and phylogenetic analysis performed using MEGA 5.0. During 2011-2013, a total of 668 samples were collected from 4 provinces that resulted in 40% of samples positive for wild poliovirus type-1 (WPV-1). None of the samples were positive for WPV-3. The areas with high frequency of WPV-1 detection were Karachi-Gadap (69%), Peshawar (82%), and Rawalpindi (65%), whereas the samples from Quetta and Sukkur remained negative for WPV during 2013. Phylogenetic analysis revealed 3 major clusters with multiple poliovirus lineages circulating across different country areas as well as in bordering areas of Afghanistan. Environmental surveillance in Pakistan has been proven to be a powerful tool to detect WPV circulation in the absence of poliomyelitis cases in many communities. Our findings emphasize the need to continue and expand such surveillance activities to other high-risk areas in the country. © The Author 2014. Published by Oxford University Press on behalf of the Infectious Diseases Society of America. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  16. Project management plan for the isotopes facilities deactivation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    Purpose of the deactivation project is to place former isotopes production facilities at ORNL in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance. This management plan was prepared to document project objectives, define organizational relationships and responsibilities, and outline the management control systems. The project has adopted the strategy of deactivating the simple facilities first. The plan provides a road map for the quality assurance program and identifies other documents supporting the Isotopes Facilities Deactivation Project

  17. Final Report for LDRD Project 02-FS-009 Gigapixel Surveillance Camera

    Energy Technology Data Exchange (ETDEWEB)

    Marrs, R E; Bennett, C L

    2010-04-20

    The threats of terrorism and proliferation of weapons of mass destruction add urgency to the development of new techniques for surveillance and intelligence collection. For example, the United States faces a serious and growing threat from adversaries who locate key facilities underground, hide them within other facilities, or otherwise conceal their location and function. Reconnaissance photographs are one of the most important tools for uncovering the capabilities of adversaries. However, current imaging technology provides only infrequent static images of a large area, or occasional video of a small area. We are attempting to add a new dimension to reconnaissance by introducing a capability for large area video surveillance. This capability would enable tracking of all vehicle movements within a very large area. The goal of our project is the development of a gigapixel video surveillance camera for high altitude aircraft or balloon platforms. From very high altitude platforms (20-40 km altitude) it would be possible to track every moving vehicle within an area of roughly 100 km x 100 km, about the size of the San Francisco Bay region, with a gigapixel camera. Reliable tracking of vehicles requires a ground sampling distance (GSD) of 0.5 to 1 m and a framing rate of approximately two frames per second (fps). For a 100 km x 100 km area the corresponding pixel count is 10 gigapixels for a 1-m GSD and 40 gigapixels for a 0.5-m GSD. This is an order of magnitude beyond the 1 gigapixel camera envisioned in our LDRD proposal. We have determined that an instrument of this capacity is feasible.

  18. LLNL Livermore site Groundwater Surveillance Plan

    International Nuclear Information System (INIS)

    1992-04-01

    Department of Energy (DOE) Order 5400.1 establishes environ-mental protection program requirements, authorities, and responsibilities for DOE operations to assume compliance with federal, state, and local environmental protection laws and regulations; Federal Executive Orders; and internal DOE policies. ne DOE Order contains requirements and guidance for environmental monitoring programs, the objectives of which are to demonstrate compliance with legal and regulatory requirements imposed by federal, state, and local agencies; confirm adherence to DOE environmental protection polices; and support environmental management decisions. The environmental monitoring programs consist of two major activities: (1) measurement and monitoring of effluents from DOE operations, and (2) surveillance through measurement, monitoring, and calculation of the effects of those operations on the environment and public health. The latter concern, that of assessing the effects, if any, of Lawrence Livermore National Laboratory (LLNL) operations and activities on on-site and off-site surface waters and groundwaters is addressed by an Environmental Surveillance Program being developed by LLNL. The Groundwater Surveillance Plan presented here has been developed on a sitespecific basis, taking into consideration facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, the extent and use of local water resources, and specific local public interest and concerns

  19. Environmental surveillance report for the INEL radioactive waste management complex. Annual report, 1976

    International Nuclear Information System (INIS)

    Dolenc, M.R.; Janke, D.H.

    1977-05-01

    This report describes the environmental surveillance activities during 1976 at the two solid waste facilities of the Idaho National Engineering Laboratory. The monitoring program encompasses periodic and random sampling of air, water, and soil within and adjacent to the Radioactive Waste Management Complex and SL-1 Burial Ground. It was found that operation of the Radioactive Waste Management Complex and SL-1 during 1976 had little radiological impact on the environment and radioactivity levels were shown to be within appropriate guidelines for worker safety

  20. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  1. Legionella spp. and legionellosis in southeastern Italy: disease epidemiology and environmental surveillance in community and health care facilities

    Directory of Open Access Journals (Sweden)

    Barbuti Giovanna

    2010-11-01

    Full Text Available Abstract Background Following the publication of the Italian Guidelines for the control and prevention of legionellosis an environmental and clinical surveillance has been carried out in Southeastern Italy. The aim of the study is to identify the risk factors for the disease, so allowing better programming of the necessary prevention measures. Methods During the period January 2000 - December 2009 the environmental surveillance was carried out by water sampling of 129 health care facilities (73 public and 56 private hospitals and 533 buildings within the community (63 private apartments, 305 hotels, 19 offices, 4 churches, 116 gyms, 3 swimming pools and 23 schools. Water sampling and microbiological analysis were carried out following the Italian Guidelines. From January 2005, all facilities were subject to risk analysis through the use of a standardized report; the results were classified as good (G, medium (M and bad (B. As well, all the clinical surveillance forms for legionellosis, which must be compiled by physicians and sent to the Regional Centre for Epidemiology (OER, were analyzed. Results Legionella spp. was found in 102 (79.1% health care facilities and in 238 (44.7% community buildings. The percentages for the contamination levels 10,000 cfu/L were respectively 33.1%, 53.4% and 13.5% for samples from health care facilities and 33.5%, 43.3% and 23.2% for samples from the community. Both in hospital and community environments, Legionella pneumophila serogroup (L. pn sg 2-14 was the most frequently isolate (respectively 54.8% and 40.8% of positive samples, followed by L. pn sg 1 (respectively 31.3% and 33%. The study showed a significant association between M or B score at the risk analysis and Legionella spp. positive microbiological test results (p Conclusions Our experience suggests that risk analysis and environmental microbiological surveillance should be carried out more frequently to control the environmental spread of Legionella

  2. Annual summary report on the surveillance and maintenance activities for the Oak Rige National Laboratory Environmental Restoration Program for fiscal year 1995

    International Nuclear Information System (INIS)

    1995-11-01

    This Annual Summary Report on the Surveillance and Maintenance Activities for the Oak Ridge National Laboratory Environmental Restoration Program for Fiscal Year 1995 was prepared to communicate the accomplishments of the Program during fiscal year 1995. This work was performed under work breakdown structure element 1.4.12.6.1.14.20 (activity data sheet 3314, ''Remedial Action Surveillance and Maintenance''). Publication of this document meets the Life Cycle Baseline milestone date of November 30, 1995. This document provides the accomplishments for both the Remedial Action and Decontamination and Decommissioning Surveillance and Maintenance programs

  3. Blue Bahia: an environmental sanitation project

    International Nuclear Information System (INIS)

    Azcona, Miguel Angel L.; Neuvirth, Bruno

    1996-01-01

    The paper presents actions developed to incorporate some aspects of environmental sanitation to the basic sanitation project, natural resources assessing, identification of the environmental degradation sources - in addition to those caused by lack of basic sanitation, and common action between public and private sectors

  4. Surveillance and Control of Malaria Transmission in Thailand using Remotely Sensed Meteorological and Environmental Parameters

    Science.gov (United States)

    Kiang, Richard K.; Adimi, Farida; Soika, Valerii; Nigro, Joseph

    2007-01-01

    These slides address the use of remote sensing in a public health application. Specifically, this discussion focuses on the of remote sensing to detect larval habitats to predict current and future endemicity and identify key factors that sustain or promote transmission of malaria in a targeted geographic area (Thailand). In the Malaria Modeling and Surveillance Project, which is part of the NASA Applied Sciences Public Health Applications Program, we have been developing techniques to enhance public health's decision capability for malaria risk assessments and controls. The main objectives are: 1) identification of the potential breeding sites for major vector species; 2) implementation of a risk algorithm to predict the occurrence of malaria and its transmission intensity; 3) implementation of a dynamic transmission model to identify the key factors that sustain or intensify malaria transmission. The potential benefits are: 1) increased warning time for public health organizations to respond to malaria outbreaks; 2) optimized utilization of pesticide and chemoprophylaxis; 3) reduced likelihood of pesticide and drug resistance; and 4) reduced damage to environment. !> Environmental parameters important to malaria transmission include temperature, relative humidity, precipitation, and vegetation conditions. The NASA Earth science data sets that have been used for malaria surveillance and risk assessment include AVHRR Pathfinder, TRMM, MODIS, NSIPP, and SIESIP. Textural-contextual classifications are used to identify small larval habitats. Neural network methods are used to model malaria cases as a function of the remotely sensed parameters. Hindcastings based on these environmental parameters have shown good agreement to epidemiological records. Discrete event simulations are used for modeling the detailed interactions among the vector life cycle, sporogonic cycle and human infection cycle, under the explicit influences of selected extrinsic and intrinsic factors

  5. Environmental Surveillance of Human Parechoviruses in Sewage in the Netherlands

    Science.gov (United States)

    Wuite, M.; de Roda Husman, A. M.; Rutjes, S. A.

    2013-01-01

    The circulation of human parechoviruses (HPeVs) in the population was studied by environmental surveillance comprising of molecular analyses of sewage samples (n = 89) that were collected from 15 different locations in the Netherlands. Samples were taken from sewage originating from schools (n = 9) or from parts of municipalities (n = 6) during the Dutch school year 2010-2011. At 13/15 locations HPeV1, HPeV3, or HPeV6 RNA was detected at least once; however, sequence diversity did not reflect associations in time or place. A higher percentage of positives was observed in the samples originating from the municipalities. It was demonstrated that HPeV circulated in the studied population to a higher extent than would be expected from the current knowledge on infections predominating in young children. PMID:23934500

  6. European monitoring systems and data for assessing environmental and climate impacts on human infectious diseases.

    Science.gov (United States)

    Nichols, Gordon L; Andersson, Yvonne; Lindgren, Elisabet; Devaux, Isabelle; Semenza, Jan C

    2014-04-09

    Surveillance is critical to understanding the epidemiology and control of infectious diseases. The growing concern over climate and other drivers that may increase infectious disease threats to future generations has stimulated a review of the surveillance systems and environmental data sources that might be used to assess future health impacts from climate change in Europe. We present an overview of organizations, agencies and institutions that are responsible for infectious disease surveillance in Europe. We describe the surveillance systems, tracking tools, communication channels, information exchange and outputs in light of environmental and climatic drivers of infectious diseases. We discuss environmental and climatic data sets that lend themselves to epidemiological analysis. Many of the environmental data sets have a relatively uniform quality across EU Member States because they are based on satellite measurements or EU funded FP6 or FP7 projects with full EU coverage. Case-reporting systems for surveillance of infectious diseases should include clear and consistent case definitions and reporting formats that are geo-located at an appropriate resolution. This will allow linkage to environmental, social and climatic sources that will enable risk assessments, future threat evaluations, outbreak management and interventions to reduce disease burden.

  7. Laboratory-based respiratory virus surveillance pilot project on select cruise ships in Alaska, 2013-15.

    Science.gov (United States)

    Rogers, Kimberly B; Roohi, Shahrokh; Uyeki, Timothy M; Montgomery, David; Parker, Jayme; Fowler, Nisha H; Xu, Xiyan; Ingram, Deandra J; Fearey, Donna; Williams, Steve M; Tarling, Grant; Brown, Clive M; Cohen, Nicole J

    2017-09-01

    Influenza outbreaks can occur among passengers and crews during the Alaska summertime cruise season. Ill travellers represent a potential source for introduction of novel or antigenically drifted influenza virus strains to the United States. From May to September 2013-2015, the Alaska Division of Public Health, the Centers for Disease Control and Prevention (CDC), and two cruise lines implemented a laboratory-based public health surveillance project to detect influenza and other respiratory viruses among ill crew members and passengers on select cruise ships in Alaska. Cruise ship medical staff collected 2-3 nasopharyngeal swab specimens per week from passengers and crew members presenting to the ship infirmary with acute respiratory illness (ARI). Specimens were tested for respiratory viruses at the Alaska State Virology Laboratory (ASVL); a subset of specimens positive for influenza virus were sent to CDC for further antigenic characterization. Of 410 nasopharyngeal specimens, 83% tested positive for at least one respiratory virus; 71% tested positive for influenza A or B virus. Antigenic characterization of pilot project specimens identified strains matching predominant circulating seasonal influenza virus strains, which were included in the northern or southern hemisphere influenza vaccines during those years. Results were relatively consistent across age groups, recent travel history, and influenza vaccination status. Onset dates of illness relative to date of boarding differed between northbound (occurring later in the voyage) and southbound (occurring within the first days of the voyage) cruises. The high yield of positive results indicated that influenza was common among passengers and crews sampled with ARI. This finding reinforces the need to bolster influenza prevention and control activities on cruise ships. Laboratory-based influenza surveillance on cruise ships may augment inland influenza surveillance and inform control activities. However, these

  8. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  9. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  10. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates

  11. The Hanford Environmental Dose Reconstruction Project: Overview

    International Nuclear Information System (INIS)

    Haerer, H.A.; Freshley, M.D.; Gilbert, R.O.; Morgan, L.G.; Napier, B.A.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    In 1988, researchers began a multiyear effort to estimate radiation doses that people could have received since 1944 at the U.S. Department of Energy's Hanford Site. The study was prompted by increasing concern about potential health effects to the public from more than 40 yr of nuclear activities. We will provide an overview of the Hanford Environmental Dose Reconstruction Project and its technical approach. The work has required development of new methods and tools for dealing with unique technical and communication challenges. Scientists are using a probabilistic, rather than the more typical deterministic, approach to generate dose distributions rather than single-point estimates. Uncertainties in input parameters are reflected in dose results. Sensitivity analyses are used to optimize project resources and define the project's scope. An independent technical steering panel directs and approves the work in a public forum. Dose estimates are based on review and analysis of historical data related to operations, effluents, and monitoring; determination of important radionuclides; and reconstruction of source terms, environmental conditions that affected transport, concentrations in environmental media, and human elements, such as population distribution, agricultural practices, food consumption patterns, and lifestyles. A companion paper in this volume, The Hanford Environmental Dose Reconstruction Project: Technical Approach, describes the computational framework for the work

  12. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  13. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  14. Surveillance Angels

    NARCIS (Netherlands)

    Rothkrantz, L.J.M.

    2014-01-01

    The use of sensor networks has been proposed for military surveillance and environmental monitoring applications. Those systems are composed of a heterogeneous set of sensors to observe the environment. In centralised systems the observed data will be conveyed to the control room to process the

  15. Discussion on the post-project assessment of environmental impact for nuclear facilities

    International Nuclear Information System (INIS)

    Shang Zhaorong

    2013-01-01

    The paper introduces the background of post-project assessment of environmental impact in the world and focuses on the characteristic of environmental impact assessment for Chinese nuclear facilities construction projects, analyzes the necessity, principle and contents of post-project assessment of environmental impact on current Chinese nuclear facilities operation. It is considered that to start the post-project assessment of environmental impact, perfect the post-project assessment mechanism, introduce the post-project assessment into environmental impact assessment system are just at the night time. (author)

  16. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  17. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates

  18. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  19. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  20. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  1. Poplar Island Environmental Restoration Project Nekton Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  2. 2002 Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance

  3. Radiation protection and environmental surveillance programme in and around Nuclear Fuel Cycle Facilities in India

    International Nuclear Information System (INIS)

    Tripathi, R.M.

    2018-01-01

    Radiation safety is an integral part of the operation of the Indian nuclear fuel cycle facilities and safety culture has been inculcated in all the spheres of its operation. Nuclear fuel cycle comprises of mineral exploration, mining, ore processing, fuel fabrication, power plants, reprocessing, waste management and accelerator facilities. Health Physics Division of BARC is entrusted with the responsibility of radiation protection and environmental surveillance in all the nuclear fuel cycle facilities

  4. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  5. Environmental auditing for oil drilling projects

    International Nuclear Information System (INIS)

    Zambrano Solarte, Hugo Ibsen; Olaya Amaya, Alfredo

    2003-01-01

    The enforcement of legal regulations on the environment requires some mechanisms related to preservation and conservation of natural resources, as well as paleontological and archaeological wealth, in order to allow their use without endangering their integrity. This article reviews legal regulations, activities and performance indicators, which should be taken into account by Environmental Auditors in oil projects. Additionally, a Plan for Environmental management is analyzed with its main components and procedures for performing the environmental auditing

  6. A model of the environmental impacts of hydropower projects

    International Nuclear Information System (INIS)

    Kemppainen, T.; Haemaelaeinen, I.

    1992-01-01

    The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects

  7. Guidebook on environmental impact assessment for in situ leach mining projects

    International Nuclear Information System (INIS)

    2005-05-01

    Assessment of the potential environmental impact of an in situ leach (ISL) project is the first step in the permission and licensing process. An Environmental Impact Assessment (EIA) serves as the basis for preparing an Environmental Impact Statement (EIS), which in turn identifies the potential environmental and socioeconomic impact of a proposed project and outlines measures to mitigate the impact. The EIS review process serves to inform the public about a proposed project as well as provide regulatory agencies with assurance that ISL technology will comply with environmental standards, and that project sites can be rehabilitated to pre-mining use. This publication provides a step-by-step description of project parameters that must be addressed in conducting an EIA and preparing an EIS. It also includes EIA/EIS case histories for current operations in Australia, the Czech Republic, Kazakhstan and the United States of America. The publication will be useful to companies considering development of ISL projects and to regulatory personnel who are responsible for writing environmental regulations and licensing ISL projects

  8. Overview of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Ikenberry, T.A.

    1992-04-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that specific and representative individuals and populations may have received as a result of releases of radioactive materials from historical operations at the Hanford Site. These dose estimates would account for the uncertainties of information regarding facilities operations, environmental monitoring, demography, food consumption and lifestyles, and the variability of natural phenomena. Other objectives of the HEDR Project include: supporting the Hanford Thyroid Disease Study (HTDS), declassifying Hanford-generated information and making it available to the public, performing high-quality, credible science, and conducting the project in an open, public forum. The project is briefly described

  9. Environmental health indicators of climate change for the United States: findings from the State Environmental Health Indicator Collaborative.

    Science.gov (United States)

    English, Paul B; Sinclair, Amber H; Ross, Zev; Anderson, Henry; Boothe, Vicki; Davis, Christine; Ebi, Kristie; Kagey, Betsy; Malecki, Kristen; Shultz, Rebecca; Simms, Erin

    2009-11-01

    To develop public health adaptation strategies and to project the impacts of climate change on human health, indicators of vulnerability and preparedness along with accurate surveillance data on climate-sensitive health outcomes are needed. We researched and developed environmental health indicators for inputs into human health vulnerability assessments for climate change and to propose public health preventative actions. We conducted a review of the scientific literature to identify outcomes and actions that were related to climate change. Data sources included governmental and nongovernmental agencies and the published literature. Sources were identified and assessed for completeness, usability, and accuracy. Priority was then given to identifying longitudinal data sets that were applicable at the state and community level. We present a list of surveillance indicators for practitioners and policy makers that include climate-sensitive health outcomes and environmental and vulnerability indicators, as well as mitigation, adaptation, and policy indicators of climate change. A review of environmental health indicators for climate change shows that data exist for many of these measures, but more evaluation of their sensitivity and usefulness is needed. Further attention is necessary to increase data quality and availability and to develop new surveillance databases, especially for climate-sensitive morbidity.

  10. EVMS Self-Surveillance of Remote Handled Low Level Waste (RHLLW) Project

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Michael L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Case, Kimberly [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hergesheimer, Linda [Idaho National Lab. (INL), Idaho Falls, ID (United States); Johnson, Maxine [Idaho National Lab. (INL), Idaho Falls, ID (United States); Parker, Doug [Idaho National Lab. (INL), Idaho Falls, ID (United States); Staten, Rick [Idaho National Lab. (INL), Idaho Falls, ID (United States); Taylor, Scott [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-07-01

    DOE G 413.3-10A, Section 3.a states: “The Contractor has primary responsibility for implementing and maintaining a surveillance program to ensure continued compliance of the system with ANSI/EIA-748B. DOE O 413.3B requires the FPD to ensure the contractor conducts a Self-Surveillance annually. This annual Self-Surveillance,…should cover all 32 guidelines of the ANSI/EIA748B. Documentation of the Self-Surveillance is sent to the CO and the PMSO (copy to OECM) confirming the continued compliance of their EVMS ANSI/EIA748B...” This review, and the associated report, is deemed to satisfy this requirement.

  11. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  12. 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report describes the calendar year 1996 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory (INEEL). Results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs are included in this report. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1996 data with program-specific regulatory guidelines and past data to evaluate trends.

  13. 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory

    International Nuclear Information System (INIS)

    1997-09-01

    This report describes the calendar year 1996 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory (INEEL). Results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs are included in this report. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1996 data with program-specific regulatory guidelines and past data to evaluate trends

  14. Continuous surveillance of transformers using artificial intelligence methods; Surveillance continue des transformateurs: application des methodes d'intelligence artificielle

    Energy Technology Data Exchange (ETDEWEB)

    Schenk, A.; Germond, A. [Ecole Polytechnique Federale de Lausanne, Lausanne (Switzerland); Boss, P.; Lorin, P. [ABB Secheron SA, Geneve (Switzerland)

    2000-07-01

    The article describes a new method for the continuous surveillance of power transformers based on the application of artificial intelligence (AI) techniques. An experimental pilot project on a specially equipped, strategically important power transformer is described. Traditional surveillance methods and the use of mathematical models for the prediction of faults are described. The article describes the monitoring equipment used in the pilot project and the AI principles such as self-organising maps that are applied. The results obtained from the pilot project and methods for their graphical representation are discussed.

  15. Contribution of Environmental Surveillance Toward Interruption of Poliovirus Transmission in Nigeria, 2012-2015.

    Science.gov (United States)

    Johnson Muluh, Ticha; Hamisu, Abdullahi Walla; Craig, Kehinde; Mkanda, Pascal; Andrew, Etsano; Adeniji, Johnson; Akande, Adefunke; Musa, Audu; Ayodeji, Isiaka; Nicksy, Gumede; Banda, Richard; Tegegne, Sisay G; Nsubuga, Peter; Oyetunji, Ajiboye; Diop, Ousmane; Vaz, Rui G; Muhammad, Ado J G

    2016-05-01

    Cases of paralysis caused by poliovirus have decreased by >99% since the 1988 World Health Assembly's resolution to eradicate polio. The World Health Organization identified environmental surveillance (ES) of poliovirus in the poliomyelitis eradication strategic plan as an activity that can complement acute flaccid paralysis (AFP) surveillance. This article summarizes key public health interventions that followed the isolation of polioviruses from ES between 2012 and 2015. The grap method was used to collect 1.75 L of raw flowing sewage every 2-4 weeks. Once collected, samples were shipped at 4 °C to a polio laboratory for concentration. ES data were then used to guide program implementation. From 2012 to 2015, ES reported 97 circulating vaccine-derived polioviruses (cVDPV2) and 14 wild polioviruses. In 2014 alone, 54 cVDPV type 2 cases and 1 WPV type 1 case were reported. In Sokoto State, 58 cases of AFP were found from a search of 9426 households. A total of 2 252 059 inactivated polio vaccine and 2 460 124 oral polio vaccine doses were administered to children aged poliovirus transmission in Nigeria. © 2016 World Health Organization; licensee Oxford Journals.

  16. Air surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Patton, G.W.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the air surveillance and monitoring programs currently in operation at that Hanford Site. Atmospheric releases of pollutants from Hanford to the surrounding region are a potential source of human exposure. For that reason, both radioactive and nonradioactive materials in air are monitored at a number of locations. The influence of Hanford emissions on local radionuclide concentrations was evaluated by comparing concentrations measured at distant locations within the region to concentrations measured at the Site perimeter. This section discusses sample collection, analytical methods, and the results of the Hanford air surveillance program. A complete listing of all analytical results summarized in this section is reported separately by Bisping (1995).

  17. Air surveillance

    International Nuclear Information System (INIS)

    Patton, G.W.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the air surveillance and monitoring programs currently in operation at that Hanford Site. Atmospheric releases of pollutants from Hanford to the surrounding region are a potential source of human exposure. For that reason, both radioactive and nonradioactive materials in air are monitored at a number of locations. The influence of Hanford emissions on local radionuclide concentrations was evaluated by comparing concentrations measured at distant locations within the region to concentrations measured at the Site perimeter. This section discusses sample collection, analytical methods, and the results of the Hanford air surveillance program. A complete listing of all analytical results summarized in this section is reported separately by Bisping (1995)

  18. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  19. SIHTI 2. Energy and environmental technology. Yearbook 1995. Project presentations

    International Nuclear Information System (INIS)

    Korhonen, M.; Thun, R.

    1997-01-01

    Detrimental impacts of various energy production forms, their prevention and costs to enterprises and to the society are studied in the National Research Programme on Energy and Environmental Technology - SIHTI 2. For this evaluation work databases on Finland's energy production, fuels and boilers and emissions of various production forms are needed. This is one of the main subtasks of the SIHTI Programme. Development of methods and tools required for environmental decision making and for the assessment of environmental costs and testing of their usability and reliability are equally important. Emission measurements are a problem field that continuously sets new challenges. In addition to energy production and its environmental impacts, environmental issues of the woodprocessing industries form another important research field of SIHTI 2 programme. A common aim of both fields is to reduce emissions of detrimental substances, to recycle raw materials, and to minimise and reuse wastes. Research and development projects are being carried out by a number of universities of different fields of science and technology, by research organisations and enterprises, and many projects are realised in close co-operation. In 1995, the programme comprised 28 R and D projects by universities and 22 enterprise-led projects. Results of these projects are presented in this yearbook. Part of the research projects continued from the preceding year and part were new projects continuing in 1996

  20. Impact of financial institution environmental guidelines on international power generation projects

    International Nuclear Information System (INIS)

    Macak, J.J. III; Schott, G.A.

    1995-01-01

    Where financing is concerned, two major players for US based international power projects are The World Bank and the Export-Import Bank of the US (Ex-Im Bank). The concern for environmental protection is a global issue, yet many countries still have no enforceable environmental regulations for power generation facilities. In the past, many projects were developed with little or no environmental controls. However, designing a power generation project to meet The World Bank environmental guidelines is now generally regarded as standard practice for independent power projects in the developing world (Price et al, 1994). The World Bank standards are mandatory for projects financed by The World Bank, through the International Finance Corporation (IFC), or associated programs like the Expanded Cofinancing Program of the International Bank for Reconstruction and Development (IBRD). The Ex-Im Bank has recently established new environmental procedures and guidelines that went into effect on February 1, 1995. In order to avoid a competitive disadvantage for US exporters and still provide a means for global environmental protection, Ex-Im Bank has taken a leadership role in encouraging the adoption of common environmental procedures and standards by leading export credit agencies around the world. Until such procedures are established, Ex-Im Bank is seeking to establish common lines in specific cases with the Organization for Economic Cooperation and Development (OECD) on environmental standards for appropriate projects (Ex-Im, 1994)

  1. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  2. 1997 LMITCO Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, B.; Street, L.; Wilhelmsen, R.

    1998-09-01

    This report describes the calendar year 1997 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs and compares 1997 data with program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standard, and to ensure protection of human health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends indicating a loss of control or unplanned releases from facility operations. With the exception of one nitrogen sample in the disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond, compliance with permits and applicable regulations was achieved. Data collected by the Environmental Monitoring Program demonstrate that public health and the environment were protected.

  3. Surveillance as public matter : Revisiting sousveillance through devices and leaks

    NARCIS (Netherlands)

    van der Velden, L.C.

    2018-01-01

    Our conceptual understanding of surveillance is continuously challenged by digital innovations. Projects that render (digital) surveillance visible and knowable become interesting analytic starting points. Since surveillance consists of technical and often secret processes, this ‘rendering visible’

  4. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  5. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  6. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  7. Projects: viable alternatives in the Environmental Education?

    Directory of Open Access Journals (Sweden)

    Marcos Jose Terossi

    2011-11-01

    Full Text Available In this article we are going to develop the reflection about the projects, its genesis, its use in education and environmental education.To this end, we will promote the discussion about the so-called "method of projects" and "projects pedagogy", with a comparison between them and outlining the approach that we consider most appropriate to EA, its limits and possibilities within the critical perspective, manufacturing and emancipatory education.

  8. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    International Nuclear Information System (INIS)

    Sebastian Puente

    1998-01-01

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics

  9. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  10. Negotiating privacy in surveillant welfare relations

    DEFF Research Database (Denmark)

    Andersen, Lars Bo; Lauritsen, Peter; Bøge, Ask Risom

    . However, while privacy is central to debates of surveillance, it has proven less productive as an analytical resource for studying surveillance in practice. Consequently, this paper reviews different conceptualisations of privacy in relation to welfare and surveillance and argues for strengthening...... the analytical capacity of the concept by rendering it a situated and relational concept. The argument is developed through a research and design project called Teledialogue meant to improve the relation between case managers and children placed at institutions or in foster families. Privacy in Teledialogue...... notion of privacy are discussed in relation to both research- and public debates on surveillance in a welfare setting....

  11. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  12. Environmental Control Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the Environmental Control Project of the 'Centro de Energia Nuclear na Agricultura' (CENA), Piracicaba , Sao Paulo State, Brazil, is described. Such research comprises: determination of ions and metals in waters from different sources; survey of the mineralogical composition of Amazon Basin rivers; development of specific methodologies for the determination of minerals in studies of mineral nutrition of plants and animal nutrition; development of methodologies for the determination of wood sample density, a nuclear method being developed to be applied to field conditions; study of the water flux mouvement within wood. (M.A.) [pt

  13. Risk based surveillance for vector borne diseases

    DEFF Research Database (Denmark)

    Bødker, Rene

    of samples and hence early detection of outbreaks. Models for vector borne diseases in Denmark have demonstrated dramatic variation in outbreak risk during the season and between years. The Danish VetMap project aims to make these risk based surveillance estimates available on the veterinarians smart phones...... in Northern Europe. This model approach may be used as a basis for risk based surveillance. In risk based surveillance limited resources for surveillance are targeted at geographical areas most at risk and only when the risk is high. This makes risk based surveillance a cost effective alternative...... sample to a diagnostic laboratory. Risk based surveillance models may reduce this delay. An important feature of risk based surveillance models is their ability to continuously communicate the level of risk to veterinarians and hence increase awareness when risk is high. This is essential for submission...

  14. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  15. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  16. Environmental management compliance reengineering project, FY 1997 report

    Energy Technology Data Exchange (ETDEWEB)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  17. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  18. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  19. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  20. Preoperational radiation surveillance of the WIPP project by EEG during 1992

    International Nuclear Information System (INIS)

    Kenney, J.W.

    1994-02-01

    The purpose of the EEG preoperational monitoring program is to document the existing concentrations of selected radionuclides in various environmental media collected from the vicinity of the WIPP site to provide a basis of comparison of any effects of future WT-PP operations. The basic methodology for conducting environmental surveillance both on-site and off-site was outlined by Spiegler (1984). This report represents a continuation of the EEG baseline data beginning in 1985, previously reported in EEG-43, EEG-47, EEG-49 and EEG-51. Such radionuclide baseline data are important in order to determine whether future WIPP operations with radioactive waste have affected concentrations of these radionuclides in the environment. EEG data are consistent with similar environmental measurements obtained by DOE beginning in 1985. Since late 1985, the EEG has collected or received as split samples 2 443 air filters with particulates, 202 water samples, 16 biota samples and 13 soil/sediment samples. A total of 5,946 specific radionuclide analyses have been performed on these samples. As reported previously by EEG (EEG-43, EEG-47, EEG-49 and EEG-51), observed concentrations of U-238 daughter radionuclides were not in equilibrium with the parent radionuclide in water samples. This observation is consistent with different radionuclide mobility in the environment. In a notice of proposed rule making for 40 CFR 141 (US EPA 1991), the Environmental Protection Agency (EPA) National Primary Drinking Water Regulations reflect this in the calculated activity-to-mass ratio of 1.3 pCi/μg of uranium using a geometric mean of the U-234:U-238 ratio in water supplies of 2.7. Ra-226 and Ra- 228 were reported in a number of water samples in concentrations similar to those previously published by EEG and DOE

  1. Environmental Radiation Surveillance Results from over the Last Decade of Operational Experience at the Regional Radiation Monitoring Stations(RRMS)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hae Young [Daegu Regional Radiation Monitoring Station, Daegu (Korea, Republic of); Yoo, Dong Han [Ulsan Regional Radiation Monitoring Station, Ulsan (Korea, Republic of); Lee, Sang Hoon [Kyungpook National University, Daegu (Korea, Republic of)

    2015-10-15

    The objectives of the current program are to monitor environmental radiation/radioactivity level in Korea and to provide the base-line data on environmental radiation/radioactivity which will be useful in the case of radiological emergency situations. This program plays an important role in the view of protecting the public health against the potential hazards of radiation and maintaining a clean environment. This paper describes an introduction to the Regional Radiation Monitoring Stations (RRMS), and also presents some results of recent years (2001-2014). The environmental radiation surveillance results of years 2001-2014 have been described. It indicates normal levels of radiation in the past years. These kinds of studies are very important in providing references in understanding the environmental radioactivity level in a particular region.

  2. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  3. Developing regional workplace health and hazard surveillance in the Americas

    Directory of Open Access Journals (Sweden)

    Choi Bernard C. K.

    2001-01-01

    Full Text Available An objective of the Workers' Health Program at the Pan American Health Organization (PAHO is to strengthen surveillance in workers' health in the Region of the Americas in order to implement prevention and control strategies. To date, four phases of projects have been organized to develop multinational workplace health and hazard surveillance in the Region. Phase 1 was a workshop held in 1999 in Washington, D.C., for the purpose of developing a methodology for identifying and prioritizing the top three occupational sentinel health events to be incorporated into the surveillance systems in the Region. Three surveillance protocols were developed, one each for fatal occupational injuries, pesticide poisoning,4 and low back pain, which were identified in the workshop as the most important occupational health problems. Phase 2 comprised projects to disseminate the findings and recommendations of the Washington Workshop, including publications, pilot projects, software development, electronic communication, and meetings. Phase 3 was a sub-regional meeting in 2000 in Rosario, Argentina, to follow up on the progress in carrying out the recommendations of the Washington workshop and to create a Virtual Regional Center for Latin America that could coordinate the efforts of member countries. Currently phase 4 includes a number of projects to achieve the objectives of this Center, such as pilot projects, capacity building, editing a compact disk, analyzing legal systems and intervention strategies, software training, and developing an internet course on surveillance. By documenting the joint efforts made to initiate and develop Regional multinational surveillance of occupational injuries and diseases in the Americas, this paper aims to provide experience and guidance for others wishing to initiate and develop regional multinational surveillance for other diseases or in other regions.

  4. Manual for environmental radiological surveillance

    International Nuclear Information System (INIS)

    Sumiya, Shuichi; Matsuura, Kenichi; Nakano, Masanao; Takeyasu, Masanori; Morisawa, Masato; Onuma, Toshimitsu; Fujita, Hiroki; Mizutani, Tomoko; Watanabe, Hajime; Sugai, Masamitsu

    2010-03-01

    Environmental radiation monitoring around the Tokai Reprocessing Plant has been conducted by the Nuclear Fuel Cycle Engineering Laboratories, based on 'Safety Regulations for the Reprocessing Plant of JAEA, Chapter IV - Environmental monitoring' and Environmental Radiation Monitoring Program decided by the Ibaraki prefectural government. The radiation monitoring installations and equipments were also prepared for emergency. This manual describes; (1) the installations of radiological measurement, (2) the installations of meteorological observation, and (3) environmental data processing system for executing the terrestrial environmental monitoring by Environmental Protection Section, Radiation Protection Department. The environmental monitoring has been operated through the manual published in 1993 (PNC TN8520 93-001). Then the whole articles were revised because the partially of installations and equipments having been updated in recent years. (author)

  5. 1998 Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    L. V. Street

    1999-09-01

    This report describes the calendar year 1998 compliance monitoring and environmental surveillance activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Drinking Water, Effluent, Storm Water, Groundwater Monitoring, and Environmental Surveillance Programs. This report compares the 1998 results to program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the monitoring and surveillance activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of public health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends, which would indicate a loss of control or unplanned releases from facility operations. The INEEL complied with permits and applicable regulations, with the exception of nitrogen samples in a disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond. Data collected by the Environmental Monitoring Program demonstrate that the public health and environment were protected.

  6. Integrating Project-Based Service-Learning into an Advanced Environmental Chemistry Course

    Science.gov (United States)

    Draper, Alison J.

    2004-02-01

    In an advanced environmental chemistry course, the inclusion of semester-long scientific service projects successfully integrated the research process with course content. Each project involved a unique community-based environmental analysis in which students assessed an aspect of environmental health. The projects were due in small pieces at even intervals, and students worked independently or in pairs. Initially, students wrote a project proposal in which they chose and justified a project. Following a literature review of their topic, they drafted sampling and analysis plans using methods in the literature. Samples were collected and analyzed, and all students assembled scientific posters describing the results of their study. In the last week of the semester, the class traveled to a regional professional meeting to present the posters. In all, students found the experience valuable. They learned to be professional environmental chemists and learned the value of the discipline to community health. Students not only learned about their own project in depth, but they were inspired to learn textbook material, not for an exam, but because it helped them understand their own project. Finally, having a community to answer to at the end of the project motivated students to do careful work.

  7. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  8. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004

  9. Crowdsourcing, citizen sensing and Sensor Web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples

    LENUS (Irish Health Repository)

    Kamel Boulos, Maged N

    2011-12-21

    Abstract \\'Wikification of GIS by the masses\\' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild\\'s term \\'Volunteered Geographic Information\\'. Six years later (2005-2011), OpenStreetMap and Google Earth (GE) are now full-fledged, crowdsourced \\'Wikipedias of the Earth\\' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional) models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and \\'human-in-the-loop sensing\\' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis\\/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, "noise", misinformation, bias and trust), the core technologies and Open Geospatial Consortium (OGC) standards involved (Sensor Web Enablement and Open GeoSMS), as well as a few outstanding project implementation examples from around the world.

  10. Crowdsourcing, citizen sensing and sensor web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples

    Directory of Open Access Journals (Sweden)

    Kamel Boulos Maged N

    2011-12-01

    Full Text Available Abstract 'Wikification of GIS by the masses' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild's term 'Volunteered Geographic Information'. Six years later (2005-2011, OpenStreetMap and Google Earth (GE are now full-fledged, crowdsourced 'Wikipedias of the Earth' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and 'human-in-the-loop sensing' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, "noise", misinformation, bias and trust, the core technologies and Open Geospatial Consortium (OGC standards involved (Sensor Web Enablement and Open GeoSMS, as well as a few outstanding project implementation examples from around the world.

  11. Crowdsourcing, citizen sensing and sensor web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples.

    Science.gov (United States)

    Kamel Boulos, Maged N; Resch, Bernd; Crowley, David N; Breslin, John G; Sohn, Gunho; Burtner, Russ; Pike, William A; Jezierski, Eduardo; Chuang, Kuo-Yu Slayer

    2011-12-21

    'Wikification of GIS by the masses' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild's term 'Volunteered Geographic Information'. Six years later (2005-2011), OpenStreetMap and Google Earth (GE) are now full-fledged, crowdsourced 'Wikipedias of the Earth' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional) models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and 'human-in-the-loop sensing' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, "noise", misinformation, bias and trust), the core technologies and Open Geospatial Consortium (OGC) standards involved (Sensor Web Enablement and Open GeoSMS), as well as a few outstanding project implementation examples from around the world.

  12. Crowdsourcing, citizen sensing and sensor web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples

    Science.gov (United States)

    2011-01-01

    'Wikification of GIS by the masses' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild's term 'Volunteered Geographic Information'. Six years later (2005-2011), OpenStreetMap and Google Earth (GE) are now full-fledged, crowdsourced 'Wikipedias of the Earth' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional) models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and 'human-in-the-loop sensing' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, "noise", misinformation, bias and trust), the core technologies and Open Geospatial Consortium (OGC) standards involved (Sensor Web Enablement and Open GeoSMS), as well as a few outstanding project implementation examples from around the world. PMID:22188675

  13. Radiological safety and environmental surveillance during the mining and milling of beach minerals and processing of monazite

    International Nuclear Information System (INIS)

    Pillai, P.M.B.; Khan, A.H.

    2003-01-01

    This paper highlights the occupational and environmental radiological safety aspects and surveillance activities associated with mining and milling of beach minerals and processing of monazite, based on the experience gained over more than three decades of operations of the plants of Indian Rare Earths Ltd, at Chavara (Kerala), Manavalakurichi (Tamilnadu) and Udyogamandal (Kerala). The mining of beach sands, mineral separation and chemical processing of monazite for the recovery of Th and U involve occupational radiation hazards and safety problems of varying magnitudes. This part of the front end of the nuclear fuel cycle involves average per-capita occupational exposures ranging from 1.0 mSv to 8 mSv per year. The collective doses involved work out to 4.5 to 5.4 Person Sieverts per year and involve nearly 1000 radiation workers. Internal exposure contributes to nearly half of the exposure. Mechanization of the operations, process modifications, administrative controls and constant safety surveillance have over the years helped to reduce the exposures and to maintain them at levels as low as reasonably achievable (ALARA). Environmental releases resulting from the operations are well within the limits stipulated by competent authorities and exposures to public from the mining, mineral separation and monazite processing are not significant. (author)

  14. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  15. Easier surveillance of climate-related health vulnerabilities through a Web-based spatial OLAP application

    Directory of Open Access Journals (Sweden)

    Gosselin Pierre

    2009-04-01

    Full Text Available Abstract Background Climate change has a significant impact on population health. Population vulnerabilities depend on several determinants of different types, including biological, psychological, environmental, social and economic ones. Surveillance of climate-related health vulnerabilities must take into account these different factors, their interdependence, as well as their inherent spatial and temporal aspects on several scales, for informed analyses. Currently used technology includes commercial off-the-shelf Geographic Information Systems (GIS and Database Management Systems with spatial extensions. It has been widely recognized that such OLTP (On-Line Transaction Processing systems were not designed to support complex, multi-temporal and multi-scale analysis as required above. On-Line Analytical Processing (OLAP is central to the field known as BI (Business Intelligence, a key field for such decision-support systems. In the last few years, we have seen a few projects that combine OLAP and GIS to improve spatio-temporal analysis and geographic knowledge discovery. This has given rise to SOLAP (Spatial OLAP and a new research area. This paper presents how SOLAP and climate-related health vulnerability data were investigated and combined to facilitate surveillance. Results Based on recent spatial decision-support technologies, this paper presents a spatio-temporal web-based application that goes beyond GIS applications with regard to speed, ease of use, and interactive analysis capabilities. It supports the multi-scale exploration and analysis of integrated socio-economic, health and environmental geospatial data over several periods. This project was meant to validate the potential of recent technologies to contribute to a better understanding of the interactions between public health and climate change, and to facilitate future decision-making by public health agencies and municipalities in Canada and elsewhere. The project also aimed at

  16. Easier surveillance of climate-related health vulnerabilities through a Web-based spatial OLAP application.

    Science.gov (United States)

    Bernier, Eveline; Gosselin, Pierre; Badard, Thierry; Bédard, Yvan

    2009-04-03

    Climate change has a significant impact on population health. Population vulnerabilities depend on several determinants of different types, including biological, psychological, environmental, social and economic ones. Surveillance of climate-related health vulnerabilities must take into account these different factors, their interdependence, as well as their inherent spatial and temporal aspects on several scales, for informed analyses. Currently used technology includes commercial off-the-shelf Geographic Information Systems (GIS) and Database Management Systems with spatial extensions. It has been widely recognized that such OLTP (On-Line Transaction Processing) systems were not designed to support complex, multi-temporal and multi-scale analysis as required above. On-Line Analytical Processing (OLAP) is central to the field known as BI (Business Intelligence), a key field for such decision-support systems. In the last few years, we have seen a few projects that combine OLAP and GIS to improve spatio-temporal analysis and geographic knowledge discovery. This has given rise to SOLAP (Spatial OLAP) and a new research area. This paper presents how SOLAP and climate-related health vulnerability data were investigated and combined to facilitate surveillance. Based on recent spatial decision-support technologies, this paper presents a spatio-temporal web-based application that goes beyond GIS applications with regard to speed, ease of use, and interactive analysis capabilities. It supports the multi-scale exploration and analysis of integrated socio-economic, health and environmental geospatial data over several periods. This project was meant to validate the potential of recent technologies to contribute to a better understanding of the interactions between public health and climate change, and to facilitate future decision-making by public health agencies and municipalities in Canada and elsewhere. The project also aimed at integrating an initial collection of geo

  17. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  18. FASSET - An European project for environmental protection

    International Nuclear Information System (INIS)

    Bruchertseifer, F.

    2003-01-01

    The European research project ''FASSET'' (Framework ASSessment of Enviromental ImpacT) will provide a framework of the environmental impact of the effects of ionising radiation and will identify protection aims for the environmental protection. This project represent a collaboration of different organisations from the European community: Sweden, Norway, Finland, Great Britain, Spain, France and Germany. The German participants are the GSF-research centre for environment and health and the German radiation protection office. The project is founded by the 5 th EC research programme. The existing national and international radiation protection regulations are focused to the humans. Other species, like plants and animals, are protected indirectly, if their habitat are close to urban areas or they represent a part of the food chain. The ICRP position ''if the man is protected, nature is protected as well'' is now under reconsideration by a ICRP-Taskgroup. The identification of perilled real reference organism by the FASSET-project is an working tool for the definition of the protection aims. For that purpose the project is divided into three working packages: dosimetry, exposure pathways and effects. Another working package is responsible for the developing of the concept using the results provided by the other working packages. (orig.)

  19. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  20. Environmental setting for biological variability at PTEPBN project of West Kalimantan

    International Nuclear Information System (INIS)

    Suwadji, E.; Endrawanto

    1995-01-01

    Biological variability was needed in the arrangement of environmental evaluation study on term of environmental impact assessment. The activity was carried out at PTEPBN project to find out and to predict the environmental setting of outgoing and ongoing project as well as the project operational after post construction. Methods to find out the environmental setting on biological variability were proposed. Based on the observation data on its terrestrial and aquatic flora and fauna, it can be concluded that terrestrial flora was found at fair to good value, terrestrial fauna at fair to good whereas aquatic flora and fauna at good. (author). 8 refs, 7 tabs, 1 fig

  1. Hanford environmental dose reconstruction project - an overview

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Farris, W.T.

    1996-01-01

    The Hanford Environmental Dose Reconstruction Project was initiated because of public interest in the historical releases of radioactive materials from the Hanford Site, located in southcentral Washington State. By 1986, over 38,000 pages of environmental monitoring documentation from the early years of Hanford operations had been released. Special committees reviewing the documents recommended initiation of the Hanford Environmental Dose Reconstruction Project, which began in October 1987, and is conducted by Battelle, Pacific Northwest Laboratories. The technical approach taken was to reconstruct releases of radioactive materials based on facility operating information; develop and/or adapt transport, pathway, and dose models and computer codes; reconstruct environmental, meterological, and hydrological monitoring information; reconstruct demographic, agricultural, and lifestyle characteristics; apply statistical methods to all forms of uncertainty in the information, parameters, and models; and perform scientific investigation that were technically defensible. The geographic area for the study includes ∼2 x 10 5 km 2 (75,000 mi 2 ) in eastern Washington, western Idaho, and northeastern Oregon (essentially the Mid-columbia Basin of the Pacific Northwest). Three exposure pathways were considered: the atmosphere, the Columbia River, and ground water

  2. Measurements of environmental radioactivity and radiation in Taiwan

    International Nuclear Information System (INIS)

    Lin Yuming; Huang Chingchung

    1993-01-01

    Established in 1974, the Taiwan Radiation Monitoring Center (TRMC) is responsible for the environmental radiation surveillance and related fields in Taiwan. Its environmental radiation monitoring programs can be categorized into two parts: surveillance of natural ionizing radiation and surveillance of man-made ionizing radiation. For natural ionizing radiation, surveillance programs are mainly to establish the radiation baseline data including radon. For man-made ionizing radiation, surveillance programs include the radio-fallout surveillance and the environmental radiation monitoring around the nuclear facilities. This article summarizes the relevant studies carried out by TRMC in the recent years

  3. Site environmental report for the Yucca Mountain Project. Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-10-01

    This site environmental report describes the environmental program conducted during 2005 by the U.S. Department of Energy, Office of Repository Development. The report describes the environmental laws and regulations that were applicable to the Yucca Mountain Project in 2005, the actions taken to comply with those laws and regulations, and the Project’s environmental program. The report also summarizes the data collected to monitor potential impacts of the Project on the environment.

  4. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  5. A latent process model for forecasting multiple time series in environmental public health surveillance.

    Science.gov (United States)

    Morrison, Kathryn T; Shaddick, Gavin; Henderson, Sarah B; Buckeridge, David L

    2016-08-15

    This paper outlines a latent process model for forecasting multiple health outcomes arising from a common environmental exposure. Traditionally, surveillance models in environmental health do not link health outcome measures, such as morbidity or mortality counts, to measures of exposure, such as air pollution. Moreover, different measures of health outcomes are treated as independent, while it is known that they are correlated with one another over time as they arise in part from a common underlying exposure. We propose modelling an environmental exposure as a latent process, and we describe the implementation of such a model within a hierarchical Bayesian framework and its efficient computation using integrated nested Laplace approximations. Through a simulation study, we compare distinct univariate models for each health outcome with a bivariate approach. The bivariate model outperforms the univariate models in bias and coverage of parameter estimation, in forecast accuracy and in computational efficiency. The methods are illustrated with a case study using healthcare utilization and air pollution data from British Columbia, Canada, 2003-2011, where seasonal wildfires produce high levels of air pollution, significantly impacting population health. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  6. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  7. Surveillance robot for nuclear power plants

    International Nuclear Information System (INIS)

    White, J.R.; Harvey, H.W.; Satterlee, P.E. Jr.

    1985-01-01

    A demonstration project to determine the feasibility and cost-effectiveness of mobile surveillance robots in nuclear power plants is being conducted by the Remote Technology Corporation (REMOTEC) for the US Nuclear Regulatory Commission. Phase I of the project was completed in March 1984 and included a survey of currently used robotic equipment and the development of a robotics application methodology. Three Tennessee Valley Authority plants were analyzed to identify specific plant areas with a high potential for surveillance robotics. Based on these results, a number of robotic system applications were prepared and evaluated for cost-effectiveness. The system with the highest potential, a mobile surveillance robot, was selected for fabrication and in-plant demonstration testing in a phase II effort. The design, fabrication, and assembly of SURBOT has been completed and cold testing is in process. It will be installed at the Browns Ferry Nuclear Plant early in 1986 for demonstration testing. Current projections are that SURBOT can be used in approx.40 rooms within the auxiliary building and will have annual savings of over 100 person-rem exposure, 1000 sets of C-zone clothing, and 1000 person-hours of labor

  8. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  9. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  10. Estimating the cost to U.S. health departments to conduct HIV surveillance.

    Science.gov (United States)

    Shrestha, Ram K; Sansom, Stephanie L; Laffoon, Benjamin T; Farnham, Paul G; Shouse, R Luke; MacMaster, Karen; Hall, H Irene

    2014-01-01

    HIV case surveillance is a primary source of information for monitoring HIV burden in the United States and guiding the allocation of prevention and treatment funds. While the number of people living with HIV and the need for surveillance data have increased, little is known about the cost of surveillance. We estimated the economic cost to health departments of conducting high-quality HIV case surveillance. We collected primary data on the unit cost and quantity of resources used to operate the HIV case surveillance program in Michigan, where HIV burden (i.e., the number of HIV cases) is moderate to high (n=14,864 cases). Based on Michigan's data, we projected the expected annual HIV surveillance cost for U.S., state, local, and territorial health departments. We based our cost projection on the variation in the number of new and established cases, area-specific wages, and potential economies of scale. We estimated the annual total HIV surveillance cost to the Michigan health department to be $1,286,524 ($87/case), the annual total cost of new cases to be $108,657 ($133/case), and the annual total cost of established cases to be $1,177,867 ($84/case). Our projected median annual HIV surveillance cost per health department ranged from $210,600 in low-HIV burden sites to $1,835,000 in high-HIV burden sites. Our analysis shows that a systematic approach to costing HIV surveillance at the health department level is feasible. For HIV surveillance, a substantial portion of total surveillance costs is attributable to maintaining established cases.

  11. Environmental Audit of the Grand Junction Projects Office

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  12. Environmental Audit of the Grand Junction Projects Office

    International Nuclear Information System (INIS)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs

  13. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  14. Long-term surveillance plan for the Lowman, Idaho, disposal site

    International Nuclear Information System (INIS)

    1993-09-01

    The long-term surveillance plan (LTSP) for the Lowman, Idaho, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Lowman disposal cell. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This preliminary final LTSP is being submitted to the US Nuclear Regulatory Commission (NRC) as a requirement for issuance of a general license for custody and long-term care for the disposal site. The general license requires that the disposal cell be cared for in accordance with the provisions of this LTSP. The LTSP documents whether the land and interests are owned by the United States or an Indian tribe, and describes, in detail, how the long-term care of the disposal site will be carried out through the UMTRA Project long-term surveillance program. The Lowman, Idaho, LTSP is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program, (DOE, 1992)

  15. Melancthon Grey Wind Project environmental screening report

    International Nuclear Information System (INIS)

    2005-01-01

    Canadian Hydro has proposed that the Melancthon and Grey Highlands Townships in Dufferin County, Ontario are ideally suited for the installation of a 240 MW wind farm. Assuming a turbine rating of 1.5 MW each, a total of 160 turbines could be installed. The utility has decided to undertake the project in up to 4 phases. This paper focuses on the construction and operation of a 75 MW wind turbine array (50, 1.5 MW turbines) dispersed over an area of about 3,511 hectares in the Melancthon Township. The total expected cost of the first phase is $130 million, with construction scheduled to begin in April 2005 for an in-service date of no later than March 31, 2006 to meet the Wind Power Production Incentive (WPPI) funding requirements. This environmental screening report (ESR) was completed to help Canadian Hydro fulfill regulatory requirements. It presented the project summary, the estimated capacity of the wind farm, and construction schedule. The environmental setting was also presented along with power line routing. This ESR addressed issues that may impact surface and ground water quality, air quality, soil erosion, environmental noise and disposal of waste materials. Issues affecting migratory birds, agricultural resources, community characteristics, construction related traffic, public health, historical resources and viewscapes were also addressed. The general conclusion of the ESR is that the project can be constructed, operated and decommissioned in such a manner as to minimize potentially adverse effects on the environment while enhancing the positive effects both locally and provincially. Migratory bird deaths due to collision with turbines are expected to be negligible and the effects of breeding bird habitat have been minimized through proposed mitigation measures. Environmental noise levels are expected to be within the applicable noise criteria. There will be no negative effect on property values within the viewshed of the turbines. There are many net

  16. Infectieziekten Surveillance Informatie Systeem

    NARCIS (Netherlands)

    Sprenger MJW; van Pelt W; CIE

    1994-01-01

    In the Netherlands an electronic network has been proposed for structured data transfer and communication concerning the control of infectious diseases. This project has been baptized ISIS (Infectious diseases Surveillance Information System). It is an initiative of the Dutch Government. ISIS

  17. The school environmental projects inside the planning and the territorial ordering

    International Nuclear Information System (INIS)

    Pablo Emilio Bonilla Luque

    2006-01-01

    The scholastic institutions of the country, must fulfill the established thing in decree 1743 of the 3 of august of 1994, sent by the ministry of national education, forces to that all the establishments of education formal, as much officials as private, in their different levels from pre-student, basic and average, include within their institutional educative projects, scholastic environmental projects within the framework of environmental, local, regional and/or national diagnoses, with a view to helping to the resolution of specific environmental problems. Within this contextual frame the Universidad Libre create inter-institutional project PRAES integrated by its faculties of accountants office, of sciences of the education, and engineering. Through the program of environmental engineering it covers the own technical-practical requirements with the georreferencial frame that implies non-single concerning the cartography aspects, teledetection, photogrammetry and territorial planning, but that coordinates with the department of engineering of systems the development of computer developing of the project, environmentally the geographic boundary in cartography, for all and each one of the educative establishments by UPZ, model applicable to local, regional and national level settles down, the computer science support helps by means of the development of the respective page web from each locality to the diffusion, overcrowded and access of the information, that finally it must allow the establishment of network PRAE of the scholastic environmental projects

  18. GSFC Supplier Surveillance

    Science.gov (United States)

    Kelly, Michael P.

    2011-01-01

    Topics covered include: Develop Program/Project Quality Assurance Surveillance Plans The work activities performed by the developer and/or his suppliers are subject to evaluation and audit by government-designated representatives. CSO supports project by selecting on-site supplier representative s by one of several methods: (1) a Defense Contract Management Agency (DCMA) person via a Letter Of Delegation (LOD), (2) an independent assurance contractor (IAC) via a contract Audits, Assessments, and Assurance (A3) Contract Code 300 Mission Assurance Support Contract (MASC)

  19. Final rapid reactivation project environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA

  20. The Project-Based Learning Approach in Environmental Education

    Science.gov (United States)

    Genc, Murat

    2015-01-01

    The purpose of this study is to investigate the effect of project-based learning on students' attitudes toward the environment. In the study that was performed with 39 students who take the "Environmental Education" course, attitude changes toward the environment were investigated in students who developed projects on environmental…

  1. Environmental issues of the Three Gorges project

    International Nuclear Information System (INIS)

    Fang Ziyun

    1994-01-01

    This article addresses the environmental status of the reservoir area, reservoir characteristics, and the information systems used for assessment of environmental impacts. The Three Gorges Project and the environment are examined in detail and benefits for the Yangtze River's middle reaches, the impact of inundation, and impacts on aquatic animals, human health, natural landscape, cultural relics, water temperature and quality, the river estuary, and the surrounding area are considered. (UK)

  2. Environmental impact assessments of the Three Gorges Project in China: Issues and interventions

    Science.gov (United States)

    Xu, Xibao; Tan, Yan; Yang, Guishan

    2013-09-01

    The paper takes China's authoritative Environmental Impact Statement for the Yangzi (Yangtze) Three Gorges Project (TGP) in 1992 as a benchmark against which to evaluate emerging major environmental outcomes since the initial impoundment of the Three Gorges reservoir in 2003. The paper particularly examines five crucial environmental aspects and associated causal factors. The five domains include human resettlement and the carrying capacity of local environments (especially land), water quality, reservoir sedimentation and downstream riverbed erosion, soil erosion, and seismic activity and geological hazards. Lessons from the environmental impact assessments of the TGP are: (1) hydro project planning needs to take place at a broader scale, and a strategic environmental assessment at a broader scale is necessary in advance of individual environmental impact assessments; (2) national policy and planning adjustments need to react quickly to the impact changes of large projects; (3) long-term environmental monitoring systems and joint operations with other large projects in the upstream areas of a river basin should be established, and the cross-impacts of climate change on projects and possible impacts of projects on regional or local climate considered.

  3. Role of Hydrogeology in Professional Environmental Projects

    Science.gov (United States)

    The purpose of this presentation is to acquaint hydrogeology students how hydrogeological principles are applied in environmental engineering projects. This presentation outlines EPA's Superfund processes of site characterization, feasibility studies, and remediation processes.

  4. Environmental education project 'Mico-Estrela Track'

    Energy Technology Data Exchange (ETDEWEB)

    Vicente, Ana Paula Camargo de; Magalhaes, Milton Pinto Magalhaes; Silva, Simone Rodrigues da; Pinheiro, Roberta Vieira Nunes; Torres, Carlos Alberto Rodrigues; Silveira, Jeanete [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Senador Canedo fuel storage terminal is situated in the Cerrado biome and implements the policy of promoting improvements in the preservation of its Green Belt by working out the Environmental Education Project 'Mico-Estrela7 Track', aimed at stimulating the preservation, protection, landscape beauty and defense of scientific sources of the Cerrado through environmental sensibilization and rational use of the existing natural resources. In the area of the track (1.5 ha) alone 352 plants have been identified, totaling 97 different species that are distributed in 36 families. The implementation of the project will contribute to strengthen the relations with the local community, like dwellers, teachers and pupils of the municipal network of Senador Canedo, as well as co-workers of the unit, thus reaffirming the commitment of the company to socio-environmental responsibility. (author)

  5. Development of the new data transmission and processing equipment for radiation surveillance

    International Nuclear Information System (INIS)

    Suzuki, Shintaro; Takahashi, Kouichi; Suganami, Jun; Kawai, Toshiaki

    2004-01-01

    In the Mito Atomic Energy Office, which belongs to Ministry of Education, Culture, Sports, Science and Technology, as part of an environmental safety measures of the nuclear institutions in Ibaraki area, the regular surveillance of the environmental monitoring data measured in Japan Nuclear Cycle Development Institute (JNC) and Japan Atomic Energy Research Institute (JAERI) which are main facilities in Oarai and Tokai area is performed. For the purpose of strengthening environmental radiation surveillance in the fiscal year 2003, the data transmission and processing equipment for radiation surveillance is updated, and the new equipment is actually operated from March, 2004. In this paper, the features and functions of the new data transmission and processing equipment are introduced. (author)

  6. The Effect of Environmental Science Projects on Students' Environmental Knowledge and Science Attitudes

    Science.gov (United States)

    Al-Balushi, Sulaiman M.; Al-Aamri, Shamsa S.

    2014-01-01

    The current study explores the effectiveness of involving students in environmental science projects for their environmental knowledge and attitudes towards science. The study design is a quasi-experimental pre-post control group design. The sample was 62 11th-grade female students studying at a public school in Oman. The sample was divided into…

  7. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  8. Environmental surveillance at Hanford for CY-1981

    International Nuclear Information System (INIS)

    Sula, M.J.; McCormack, W.D.; Dirkes, R.L.; Price, K.R.; Eddy, P.A.

    1982-05-01

    Environmental surveillance activities performed by the Pacific Northwest Laboratory for 1981 are discussed. The results are summarized as follows: Radionuclide concentrations and radiation dose measurements were below applicable concentration guides and radiation dose standards. There was no difference detected between airborne radionuclide concentrations in samples collected near to and far from the Hanford Site. A difference in 129 I concentration in Columbia River water downstream compared to upstream was observed. Strontium-90 concentrations downstream remained similar to past years while reduced concentrations were observed in the upstream samples. In addition, 60 Co and 131 I were observed more frequently in the downstream river water samples than in the upstream samples. In all cases, the downstream radionuclide concentrations were small in comparison to DOE radionuclide concentration guides and state and EPA drinking water standards. Low concentrations of radionuclides attributed to operations were observed in wildlife collected onsite. Low concentrations of fallout radionuclides from worldwide atmospheric nuclear testing were observed in foodstuffs and in soil and vegetation; there was no indication of a Hanford contribution to radionuclide levels. The highest penetrating dose rates were in the vicinities of the 100N and 300 Areas. Dose rates at both locations resulted from the presence, within the operating areas, of contained radioactive materials. Nonradiological water quality parameters were all within State Water Quality Standards for the Columbia River. The maximum 50-year whole body dose commitment to an individual from effluents released in 1981 was calculated to be 0.4 mrem. The maximum 50-year dose to a single organ, considering all pathways was approximately 1.3 mrem to the bone, primarily due to 90 Sr in the Columbia River

  9. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  10. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    OpenAIRE

    Mohamed Marzouk; Mohamed El-zayat; Ahmed Aboushady

    2017-01-01

    Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG) footprint, eutrophication potential (EP), acidification potential (AP), human health (HH) particulate, ozone depletion, and smog. Each of these environmenta...

  11. Environmental Impact Assessment of a Water Transfer Project

    Directory of Open Access Journals (Sweden)

    Pazoki

    2015-07-01

    Full Text Available Background Reliable water supplies for drinking and agriculture are some of the objectives for the sustainable development of every country. However, constructed facilities such as dams and irrigation networks and drainage can exert positive and negative effects directly or indirectly on the environment. The environmental impact assessment is a method for identifying the positive and negative effects caused by a plan and suggests performance management best practices aimed at lessening the negative impacts and augmenting the positive ones. Objectives The present study sought to evaluate the environmental impacts of the water transfer project of the Jooban Dam in two phases of preparation and operation. Materials and Methods A checklist containing the positive, negative, short-term, and long-term effects as well as the continuation and probable occurrence of these effects was used. Results The results showed that the negative environmental and social impacts of the project outweighed the positive impacts in terms of type, number, and intensity. Conclusions Unless there are well-thought out strategies for minimizing the undesirable impact on the environment, it is not advisable that such projects be permitted.

  12. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  13. Atmosphere Resource Recovery & Environmental Monitoring for Long Duration Exploration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Atmosphere Resource Recovery & Environmental Monitoring (ARREM) for Long Duration Exploration Project project is maturing Atmosphere Revitalization...

  14. Stuart oil shale project stage two: executive summary: draft environmental impact statement

    International Nuclear Information System (INIS)

    1999-09-01

    The project is an oil shale open pit mine and processing operation that is currently being commissioned 15 km north of Gladstone, Queensland, Australia, and is owned as a joint venture by Southern Pacific Petroleum N.L., Central Pacific Minerals N.L, and Suncor Energy Inc., a leading Canadian company that is an integrated energy company. The results of a comprehensive investigation are included of the potential environmental impacts of the project, and which are described in the Draft Environmental Impact Statement (EIS). In stage two, there is included the existing mine expansion as well as the construction of an additional process plant based around a larger commercial scale ATP oil shale processing plant. The new stage two operation will be developed next to and integral with services and infrastructure provided for stage one. Described are: the assessment process, regulatory framework and the project area, the needs for an alternative to the project, the proposal itself, the existing natural, social and economic impacts, and the environmental impacts as well as plans for their mitigation. In appendices there are included a draft environmental management overview strategy and an environmental management plan. The elements covered in the report by section are: background, need for the project, the proponent, legislation and approvals, project description, environmental issues and impact management

  15. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  16. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    International Nuclear Information System (INIS)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989

  17. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-01-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities

  18. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  19. Tank Farm Operations Surveillance Automation Analysis

    International Nuclear Information System (INIS)

    MARQUEZ, D.L.

    2000-01-01

    The Nuclear Operations Project Services identified the need to improve manual tank farm surveillance data collection, review, distribution and storage practices often referred to as Operator Rounds. This document provides the analysis in terms of feasibility to improve the manual data collection methods by using handheld computer units, barcode technology, a database for storage and acquisitions, associated software, and operational procedures to increase the efficiency of Operator Rounds associated with surveillance activities

  20. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  1. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  2. Oconee Nuclear Station, Units 1, 2, and 3. Annual operating report for 1976, volume 1: nonradiological environmental surveillance report; II: summary of operations

    International Nuclear Information System (INIS)

    1977-01-01

    The non-radiological environmental surveillance program including thermal and chemical effluents, water quality, fish populations, benthos, fish impingement, gas-bubble disease, and plankton, fish larvae and fish egg entrainment is described. Information is also presented concerning operations, personnel radiation exposures, and fuel examinations

  3. The Florida Ranchlands Environmental Services Project: Field Testing a Pay-for-Environmental-Services Program

    OpenAIRE

    Lynch, S.; Shabman, L.

    2007-01-01

    The Florida Ranchlands Environmental Services Project (FRESP) was recently launched, which will field test a program to complement the existing restoration programs such as the Lake Okeechobee Protection Plan (LOPP), which uses public funding to build treatment wetlands, drill aquifer storage, and capture rainwater (to delay its arrival downstream). FRESP will pay cattle ranchers to provide environmental services that will benefit the lake. PES-1 (Payments for Environmental Services Associ...

  4. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  5. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  6. Savannah River Site environmental report for 1993

    International Nuclear Information System (INIS)

    Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R.

    1994-01-01

    Savannah River Site (SRS) conducts effluent monitoring and environmental surveillance to ensure the safety of the public and the well-being of the environment. DOE Order 5400,1, ''General Environmental Protection Program,'' requires the submission of an environmental report that documents the impact of facility operations on the environment and on public health. SRS has had an extensive environmental surveillance program in place since 1951 (before site startup). At that time, data generated by the on-site surveillance program were reported in site documents. Beginning in 1959, data from off-site environmental monitoring activities were presented in reports issued for public dissemination. Separate reporting of SRS's on- and off-site environmental monitoring activities continued until 1985, when data from both surveillance programs were merged into a single public document. The Savannah River Site Environmental Report for 1993 is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 1993. For complete program descriptions, consult the ''SRS Environmental Monitoring Plan'' (WSRC-3Ql-2-1000). It documents the rationale and design criteria for the monitoring program, the frequency of monitoring and analysis, the specific analytical and sampling procedures, and the quality assurance requirements

  7. Savannah River Site environmental report for 1993

    Energy Technology Data Exchange (ETDEWEB)

    Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R. [eds.

    1994-08-01

    Savannah River Site (SRS) conducts effluent monitoring and environmental surveillance to ensure the safety of the public and the well-being of the environment. DOE Order 5400,1, ``General Environmental Protection Program,`` requires the submission of an environmental report that documents the impact of facility operations on the environment and on public health. SRS has had an extensive environmental surveillance program in place since 1951 (before site startup). At that time, data generated by the on-site surveillance program were reported in site documents. Beginning in 1959, data from off-site environmental monitoring activities were presented in reports issued for public dissemination. Separate reporting of SRS`s on- and off-site environmental monitoring activities continued until 1985, when data from both surveillance programs were merged into a single public document. The Savannah River Site Environmental Report for 1993 is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 1993. For complete program descriptions, consult the ``SRS Environmental Monitoring Plan`` (WSRC-3Ql-2-1000). It documents the rationale and design criteria for the monitoring program, the frequency of monitoring and analysis, the specific analytical and sampling procedures, and the quality assurance requirements.

  8. Wuskwatim generation project : Canadian Environmental Assessment Act comprehensive study report

    International Nuclear Information System (INIS)

    2005-10-01

    This study report described the plan by Manitoba Hydro and the Nisichawayasihk Cree Nation (NCN) to construct a new 200- megawatt (MW) generating station at Taskinigup Falls on the Burntwood River, near the outlet of Wuskwatim Lake. This hydroelectric power project will allow Manitoba Hydro to meet its projected energy needs within the next two decades as identified in its 2002/03 Power Resource Plan. It will also allow Manitoba Hydro and NCN to obtain additional export revenues and profits by advancing the in-service date of the Project from 2020 to 2009. A formal environmental assessment is required under the Canadian Environmental Assessment Act (CEAA) because Fisheries and Oceans Canada (DFO) has determined that the Project would cause fish habitat losses requiring an authorization under the Fisheries Act. Many of the structures to be built in navigable waters would also require formal approval under the Navigable Waters Protection Act (NWPA), which has prompted this application of the CEAA. This environmental assessment report has been prepared by DFO in consultation with Transport Canada and other federal authorities concerned. It provides a summary of the Wuskwatim Generation Project and the environment in which it will be built and operated. In addition, the results of public consultations are discussed. It presents an assessment of the Project's influence on fish and fish habitat, birds, species at risk, human health (local air quality, quality of drinking water and consumption of fishery products), navigation, use of renewable resources, and current use of lands and resources for traditional purposes by Aboriginal persons (hunting, trapping, gathering, subsistence fishing and heritage sites). It was concluded that the proposed Project, as defined by the scope of the study, is not likely to cause significant adverse environmental effects. 45 refs., 5 tabs., 13 figs., 3 appendices

  9. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program

  10. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  11. Portsmouth Gaseous Diffusion Plant Decontamination and Decommissioning Program surveillance and maintenance plan, FY 1993--2002

    International Nuclear Information System (INIS)

    Schloesslin, W.

    1992-11-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Portsmouth Gaseous Diffusion Plant (PORTS) is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide PORTS the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER Program. The D ampersand D Program provides collective management of the sites within the plant which require decontamination and decommissioning, prioritizes those areas in terms of health, safety and environmental concerns, and implements the appropriate level of remedial action. The D ampersand D Program provides support to facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each inactive facility has been prepared. This report provides this documentation for the PORTS facilities currently included in the D ampersand D Program and includes projected resource requirements for the planning period of FY 1993 through FY 2002

  12. Crowdsourcing, citizen sensing and Sensor Web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples

    Energy Technology Data Exchange (ETDEWEB)

    Kamel Boulos, Maged; Resch, Bernd; Crowley, David N.; Breslin, John G.; Sohn, Gunho; Burtner, Edwin R.; Pike, William A.; Jeziersk, Eduardo; Slayer Chuang, Kuo Yu

    2011-12-21

    The PIE Activity Awareness Environment is designed to be an adaptive data triage and decision support tool that allows role and activity based situation awareness through a dynamic, trainable filtering system. This paper discusses the process and methodology involved in the application as well as some of its capabilities. 'Wikification of GIS by the masses' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild's term 'Volunteered Geographic Information'. Six years later (2005-2011), OpenStreetMap and Google Earth (GE) are now full-fledged, crowdsourced 'Wikipedias of the Earth' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional) models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and 'human-in-the-loop sensing' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, 'noise', misinformation, bias and trust), the core technologies and Open Geospatial

  13. The scholastic environmental projects inside of the planning and the territorial ordering

    International Nuclear Information System (INIS)

    Bonilla Luque, Pablo Emilio

    2005-01-01

    The scholastic institutions of the country, must fulfill the established thing in decree 1743 of the 3 of august of 1994, sent by the ministry of national education, forces to that all the establishments of education formal, as much officials as private, in their different levels from pre-student, basic and average, include within their institutional educative projects, scholastic environmental projects within the framework of environmental, local, regional and/or national diagnoses, with a view to helping to the resolution of specific environmental problems. Within this contextual frame the Universidad Libre create inter-institutional project PRAES integrated by its faculties of accountants office, of sciences of the education, and engineering. Through the program of environmental engineering it covers the own technical-practical requirements with the georreferencial frame that implies non-single concerning the cartography aspects, teledetection, photogrammetry and territorial planning, but that coordinates with the department of engineering of systems the development of computer Developing of the project, environmentally the geographic boundary in cartography, for all and each one of the educative establishments by UPZ, model applicable escalarmente to local regional and national level settles down, the computer science support helps by means of the development of the respective page web from each locality to the diffusion, overcrowded and access of the information, that finally it must allow the establishment of network PRAE of the scholastic environmental projects

  14. 2003 Idaho National Engineering and Environmental Laboratory Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-05-23

    Annual Illness and Injury Surveillance Program report for 2003 for Idaho National Lab. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  15. The use of environmental DNA in invasive species surveillance of the Great Lakes commercial bait trade.

    Science.gov (United States)

    Nathan, Lucas R; Jerde, Christopher L; Budny, Michelle L; Mahon, Andrew R

    2015-04-01

    Over 180 non-native species have been introduced in the Laurentian Great Lakes region, many posing threats to native species and ecosystem functioning. One potential pathway for introductions is the commercial bait trade; unknowing or unconcerned anglers commonly release unused bait into aquatic systems. Previous surveillance efforts of this pathway relied on visual inspection of bait stocks in retail shops, which can be time and cost prohibitive and requires a trained individual that can rapidly and accurately identify cryptic species. Environmental DNA (eDNA) surveillance, a molecular tool that has been used for surveillance in aquatic environments, can be used to efficiently detect species at low abundances. We collected and analyzed 576 eDNA samples from 525 retail bait shops throughout the Laurentian Great Lake states. We used eDNA techniques to screen samples for multiple aquatic invasive species (AIS) that could be transported in the bait trade, including bighead (Hypophthalmichthys nobilis) and silver carp (H. molitrix), round goby (Neogobius melanostomus), tubenose goby (Proterorhinus marmoratus), Eurasian rudd (Scardinius erythrophthalmus), and goldfish (Carassius auratus). Twenty-seven samples were positive for at least one target species (4.7% of samples), and all target species were found at least once, except bighead carp. Despite current regulations, the bait trade remains a potential pathway for invasive species introductions in the Great Lakes region. Alterations to existing management strategies regarding the collection, transportation, and use of live bait are warranted, including new and updated regulations, to prevent future introductions of invasive species in the Great Lakes via the bait trade. © 2014 Society for Conservation Biology.

  16. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  17. Environmental impact assessment of Kachchh tidal power project

    International Nuclear Information System (INIS)

    Yadav, Ramanand; Lal, B.B.

    1995-01-01

    The Kachchh tidal power development project is a single-basin, single -effect and ebb generation development by construction of a tidal power barrage of about 3.25 km length across Hansthal creek. The project may disturb the ecosystem of the region. The paper deals in detail the environmental impacts of the project on climate, water velocity, flow and sedimentation pattern, water quality, flora and fauna, fishery, tourism and recreation, wild life, public health and socio-economic conditions. (author). 4 refs., 1 fig., 2 tabs

  18. Laboratorium Surveillance Infectieziekten - 1989-1995

    NARCIS (Netherlands)

    Esveld MI; van Pelt W; van Leeuwen WJ; Banffer JRJ; CIE; LIS

    1996-01-01

    Voor planning m.b.t. bestrijding van infectieziekten moeten overheid en betrokken instanties keuzen maken over de ontwikkeling en implementatie van beheersprogramma's en epidemiologisch en diagnostisch onderzoek. Surveillance is hiertoe een onmisbare ondersteuning. Door het LSI-project wordt

  19. Modification of an environmental surveillance program to monitor PCDD/Fs and metals around a municipal solid waste incinerator.

    Science.gov (United States)

    Vilavert, Lolita; Nadal, Martí; Mari, Montse; Schuhmacher, Marta; Domingo, José L

    2009-11-01

    Since the mid-90s, an environmental surveillance program has been on-going to provide information on the levels of PCDD/Fs and various metals in soil and vegetation samples collected in the vicinity of a municipal solid waste incinerator (MSWI) in Tarragona (Catalonia, Spain). However, the presence of other potential sources of pollution in the zone, such as traffic, forest fires, local industries, etc., makes hard to determine the impact concerning the MSWI. Therefore, in 2007 a change in the monitoring program was implemented by collecting additional ambient air samples through active and passive sampling devices. Mean PCDD/F levels in herbage and soil were 0.10 ng I-TEQ/kg dry weight (range: 0.05-0.17 ng I-TEQ/kg dw) and 0.64 ng I-TEQ/kg dw (range: 0.13-2.41 ng I-TEQ/kg dw), respectively. A significant reduction of the PCDD/F concentration in both monitors was observed with respect to our previous surveys. Air mean concentrations of PCDD/Fs were 12.04 and 15.21 fg WHO-TEQ/m(3) in 2007 and 2008, respectively, meaning a non-significant increase of 26%. In addition, a generalized increase of environmental metal levels with respect to our baseline study was not observed. The current concentrations of PCDD/Fs and metals in the vicinity of the MSWI of Tarragona are relatively low in comparison with other areas under the influence of emissions from waste incinerators. This indicates that the environmental impact of the MSWI of Tarragona is not significant. Moreover, the modification of the surveillance program has proven to be successful.

  20. Interdisciplinary Project-Based Learning through an Environmental Water Quality Study

    Science.gov (United States)

    Juhl, Lorie; Yearsley, Kaye; Silva, Andrew J.

    1997-12-01

    An interdisciplinary environmental water quality study was designed and conducted to enhance training and employability of chemical and environmental technician students in associate degree programs. Four project objectives were identified as a means to enhance the educational experience and employability of our students: provide experience on analytical instrumentation for organic compounds (gas chromatography/mass spectrometry, GC/MS), require interdisciplinary group interactions and problem solving, provide experience with Environmental Protection Agency (EPA) procedures, and require cooperation with state agencies/private organizations. Students worked in groups that included representatives from both programs to develop project objectives and a Sampling and Analysis Plan (SAP) following EPA standards. Input from personnel at Idaho's Department of Environmental Quality and Bureau of Laboratories and from volunteers in an environmental "watch dog" organization called the Henry's Fork Foundation aided students in the development and implementation of their SAP. Subsequently, groups sampled sections of the Henry's Fork River and analyzed for organic, inorganic, and fecal contaminants. Analysis included EPA method 525.2 for pesticides using GC/MS. Data from all river segments was shared and each group submitted a final report analyzing results. Surveys completed by students and instructors indicate that the project is a successful teaching method allowing introduction of new skills as well as review of important technical and employability skills.

  1. The burden of rare cancers in Italy: the surveillance of rare cancers in Italy (RITA) project.

    Science.gov (United States)

    Trama, Annalisa; Mallone, Sandra; Ferretti, Stefano; Meduri, Francesca; Capocaccia, Riccardo; Gatta, Gemma

    2012-01-01

    The project Surveillance of rare cancers in Italy (RITA) provides, for the first time, estimates of the burden of rare cancers in Italy based on the list of rare cancers proposed in collaboration with the European project Surveillance of Rare Cancers in Europe (RARECARE). RITA analyzed data from Italian population-based cancer registries (CR). The period of diagnosis was 1988 to 2002, and vital status information was available up to December 31, 2003. Incidence rates were estimated for the period 1995-2002, survival for the years 2000-2002 (with the period method of Brenner), and complete prevalence at January 1, 2003. Rare cancers are those with an incidence <6/100,000/year. In Italy, every year there are 60,000 new diagnoses of rare cancers corresponding to 15% of all new cancer diagnoses. Five-year relative survival was on the average worse for rare cancers (53%) than for common cancers (73%). A total of 770,000 patients were living in Italy in 2008 with a diagnosis of a rare cancer, 22% of the total cancer prevalence. Our estimates constitute a useful base for further research and support the idea that rare cancers are a public health problem that deserves attention. Centers of expertise for rare cancers that pool cases, expertise and resources could ensure an adequate clinical management for these diseases. Our data also showed that cancer registries are suitable sources of data to estimate incidence, prevalence and survival for rare cancers and should continue to monitoring rare cancers in Italy.

  2. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  3. Interim report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-02-01

    Concern for the environment and cost reduction are the driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. Preliminary activities included surveying the directional drilling access needs of various DOE sites, identifying an existing class of machinery that could be enhanced for environmental work through development, and establishing a mutually beneficial working relationship with an industry partner. Since that time the project has tested a variety of prototype machinery and hardware built by the industrial partner, and SNL. The project continues to test and develop the machinery and technique refinements needed for future applications at DOE, DOD, and private sector sites. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of ``cut/thrust and compact cuttings without adding large quantities of fluid`` to an environmental problem site. Technology transfer to the private sector is ongoing and ultimately should result in commercial availability of the machinery. Education of regulatory agencies resulting in restructuring appropriate regulatory standards for specification of the horizontal drilling techniques will be a final project goal.

  4. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework

    Directory of Open Access Journals (Sweden)

    Sarfaraz Hashemkhani Zolfani

    2018-03-01

    Full Text Available Environmental issues have got incredible attention among daily life activities. Sustainability penetrated in all society practices specially construction industry due to its substantial impact on the environment. Monitoring and controlling architectural project contains a decision problem with multi-varieties analysis. This study aimed to evaluate construction projects of hotels regarding environmental sustainability. To this end, a hybrid Multiple Criteria Decision Making (MCDM model is proposed. Step‐wise Weight Assessment Ratio Analysis (SWARA and Complex proportional assessment (COPRAS compose a unified framework. A private construction project is supposed as a case study. The project is based on establishing a five star hotel in Tehran, Iran. In this research SWARA produces criteria weights and COPRAS will rank decision alternatives. This study can be a strategic route for other similar researches in other fields. Keywords: Architecture projects, Sustainability, Environmental sustainability, SWARA, COPRAS

  5. Environmental impact assessment for uranium mine, mill and in situ leach projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries. 1 fig., 5 tabs.

  6. Environmental impact assessment for uranium mine, mill and in situ leach projects

    International Nuclear Information System (INIS)

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries

  7. Environmental Project of I.E.S. Antoni Maura

    Science.gov (United States)

    Crespi Salom, Pere

    2010-05-01

    Environmental Project of I.E.S. Antoni Maura Author(s): Pere Crespí i Salom Teacher of Department of Biology and Geology and Environmental Coordinator (2009-2010) from I.E.S. Antoni Maura . Mallorca. Illes Balears. Spain Teachers participating in the project : Myriam Fuentes Milani, Olga Ballester Nebot, Antoni Salom Ruiz, Julio René Loayza Casanova, Puy Aguirre Rémirez, Yolanda Martínez Laserna, Jaume Puppo Lama, Carme Arrom , Dolors Aguiló Segura, Marga Ordinas Boter, Angel Fernàndez Albertí , Immaculada Suau López, Antònia Florit Torrandell, Isabel Mateu Arcos, Román Piña Valls i Pere Crespí Salom. Our institute takes part since 2004 in adapting environmentally the schools in the Balearics which consists of developing activities which aim is that both teachers and students acquire habits so as to apply to their ordinary lives though different participative commissions ( 10-15 teachers): 1st commission: recycling and reusing materials. Enough bins in the classrooms and floors: yellow for plastic, blue for paper, and green for the other. We tend to use recycled materials in different celebrations such as Carnival, Christmas, Saint Jordi and Environmental day. We also organise workshops for the teachers to develop afterwards with the students and nature of environmental exposures. 2nd commission: Scatter information ( MonMaura, Maurifull, Green window and website).Throughout different means we inform the teachers and students about all the school activities and where to consult.( www.iesantonimaura.net, Playful area , environmental project ). 3rd commission: Reusing text books.( there is a students service of borrowing books and giving them back at the end of the school year if the book is in good use.) 4th commission: Improving the school surroundings, the back garden and garden with native plants. Department of Biology and Geology is responsible for caring for an organic garden and in turn improve the center's garden with native plants within the

  8. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  9. Global Climate Change and Environmental Health: Proceedings of the 1997 Annual Conference of the Society for Occupational and Environmental Health

    International Nuclear Information System (INIS)

    Kovats, Sari; Patz, Jonathan A.; Dobbins, Dennis

    1998-01-01

    The purpose of the conference was to bring together a diverse group of occupational and environmental health experts to address the potential effects of climate change and ozone depletion on the current and future incidence of disease, heat stress, food and water supplies, and air pollution; to discuss initial strategies for improving R and D, global health surveillance systems, disease prevention, medical and public health community education, international cooperation, and public outreach; to address this international occupational and environmental health problem; and to explore international challenges and opportunities for collaborative projects in addressing these potential effects

  10. Multimodal surveillance sensors, algorithms, and systems

    CERN Document Server

    Zhu, Zhigang

    2007-01-01

    From front-end sensors to systems and environmental issues, this practical resource guides you through the many facets of multimodal surveillance. The book examines thermal, vibration, video, and audio sensors in a broad context of civilian and military applications. This cutting-edge volume provides an in-depth treatment of data fusion algorithms that takes you to the core of multimodal surveillance, biometrics, and sentient computing. The book discusses such people and activity topics as tracking people and vehicles and identifying individuals by their speech.Systems designers benefit from d

  11. Environmental agreements in Canada : Aboriginal participation, EIA follow-up and environmental management of major projects

    Energy Technology Data Exchange (ETDEWEB)

    O' Faircheallaigh, C. [Griffith Univ., Brisbane (Australia). Dept. of Politics and Public Policy

    2006-05-15

    Attempts are now being made to address the historic marginalization of indigenous peoples from the management of resource projects located on their ancestral lands through the use of environmental agreements. However, the rapid pace of resource development in certain regions of Canada has meant that there is an increased need to ensure effective follow-up procedures for Environmental Impact Assessment (EIA) processes in order to achieve meaningful Aboriginal participation in the management of large-scale resource projects. Lack of effective follow-up has made it difficult for the relevant agencies to manage risks and uncertainties. This book discussed the use of new policy environmental agreements between industry, government, and Aboriginal peoples. Case studies where environmental agreements were used in the Northwest Territories, Alberta, and Newfoundland were presented in order to demonstrate their efficacy. It was concluded that structures and processes must be designed to encourage Aboriginal participation in consultation processes. refs., tabs.

  12. Oak Ridge Reservation annual site environmental report for 1996

    International Nuclear Information System (INIS)

    1997-10-01

    The US Department of Energy currently oversees activities on the Oak Ridge Reservation (ORR), a government-owned, contractor-operated facility. Three sites compose the reservation: the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, and East Tennessee Technology Park (formerly the K-25 Site). The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced the materials for the first atomic bombs. The reservation's role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the US. Both the work carried out for the war effort and subsequent research, development, and production activities have produced (and continue to produce) radiological and hazardous wastes. This document contains a summary of environmental monitoring activities on the ORR and its surroundings. Environmental monitoring on the ORR consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents prior to release into the environment; these measurements allow the quantification and official reporting of contaminants, assessment of radiation exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of the collection and analysis of environmental samples from the site and its environs; this provides direct measurement of contaminants in air, water, groundwater, soil, foods, biota, and other media subsequent to effluent release into the environment. Environmental surveillance data verify ORR's compliance status and, combined with data from effluent monitoring, allow the determination of chemical and radiation dose/exposure assessment of ORR operations and effects, if any, on the local environment

  13. Oak Ridge Reservation annual site environmental report for 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The US Department of Energy currently oversees activities on the Oak Ridge Reservation (ORR), a government-owned, contractor-operated facility. Three sites compose the reservation: the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, and East Tennessee Technology Park (formerly the K-25 Site). The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced the materials for the first atomic bombs. The reservation`s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the US. Both the work carried out for the war effort and subsequent research, development, and production activities have produced (and continue to produce) radiological and hazardous wastes. This document contains a summary of environmental monitoring activities on the ORR and its surroundings. Environmental monitoring on the ORR consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents prior to release into the environment; these measurements allow the quantification and official reporting of contaminants, assessment of radiation exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of the collection and analysis of environmental samples from the site and its environs; this provides direct measurement of contaminants in air, water, groundwater, soil, foods, biota, and other media subsequent to effluent release into the environment. Environmental surveillance data verify ORR`s compliance status and, combined with data from effluent monitoring, allow the determination of chemical and radiation dose/exposure assessment of ORR operations and effects, if any, on the local environment.

  14. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  15. The Environmental and Molecular Sciences Laboratory project -- Continuous evolution in leadership

    International Nuclear Information System (INIS)

    Knutson, D.E.; McClusky, J.K.

    1994-10-01

    The Environmental and Molecular Sciences Laboratory (EMSL) construction project at Pacific Northwest Laboratory (PNL) in Richland, Washington, is a $230M Major Systems Acquisition for the US Department of Energy (DOE). The completed laboratory will be a national user facility that provides unparalleled capabilities for scientists involved in environmental molecular science research. This project, approved for construction by the Secretary of Energy in October 1993, is underway. The United States is embarking on an environmental cleanup effort that dwarfs previous scientific enterprise. Using current best available technology, the projected costs of cleaning up the tens of thousands of toxic waste sites, including DOE sites, is estimated to exceed one trillion dollars. The present state of scientific knowledge regarding the effects of exogenous chemicals on human biology is very limited. Long term environmental research at the molecular level is needed to resolve the concerns, and form the building blocks for a structure of cost effective process improvement and regulatory reform

  16. The Environmental and Molecular Sciences Laboratory project -- Continuous evolution in leadership

    Energy Technology Data Exchange (ETDEWEB)

    Knutson, D.E.; McClusky, J.K.

    1994-10-01

    The Environmental and Molecular Sciences Laboratory (EMSL) construction project at Pacific Northwest Laboratory (PNL) in Richland, Washington, is a $230M Major Systems Acquisition for the US Department of Energy (DOE). The completed laboratory will be a national user facility that provides unparalleled capabilities for scientists involved in environmental molecular science research. This project, approved for construction by the Secretary of Energy in October 1993, is underway. The United States is embarking on an environmental cleanup effort that dwarfs previous scientific enterprise. Using current best available technology, the projected costs of cleaning up the tens of thousands of toxic waste sites, including DOE sites, is estimated to exceed one trillion dollars. The present state of scientific knowledge regarding the effects of exogenous chemicals on human biology is very limited. Long term environmental research at the molecular level is needed to resolve the concerns, and form the building blocks for a structure of cost effective process improvement and regulatory reform.

  17. Initial results of Pakistan's first road traffic injury surveillance project.

    Science.gov (United States)

    Shamim, Shahzad; Razzak, Junaid A; Jooma, Rashid; Khan, Uzma

    2011-09-01

    Our aim is to report the findings of the initial three years of road traffic injuries (RTI) surveillance at Karachi and to compare it with previously published RTI-related data from Pakistan and other low-and middle-income countries. Data were collected through the RTI surveillance programme at Karachi (RTIRP) from the five biggest emergency departments of the city, which receive almost all the major emergencies of the city for the period September 2006 till September 2009. A total of 99,272 victims were enlisted by the RTIRP during the study period. Annual incidence of RTI is calculated to be 184.3 per 100,000 populations and mortality is 5.7 per 100,000 populations. Eighty nine per cent of victims are male and 73% are between 15 and 44 years of age. Commonest road user to be affected is riders of two wheelers (45%). Only 7% of affected motorcyclists were found to be wearing helmets at the time of the accident. Trends of injuries remained uniform over the years. Most frequent injuries were external wounds, followed by orthopaedic injuries. On the basis of our surveillance system, we have presented the largest RTI-related data from a metropolitan city of Pakistan to date.

  18. Integrated Disease Surveillance in India: Way Forward

    OpenAIRE

    Deepak K. Raut; Anil K. Bhola

    2014-01-01

    Integrated Disease Surveillance Project (IDSP) with 9 years of its implementation in India has given a positive impetus to integration of surveillance functions primarily for epidemic prone diseases and decentralized symptoms--‐based detection of early warning signals of outbreaks at primary health care level. This review is based on systematic literature review through PubMed and Google Scholar databases and published reports of the IDSP from 2005-2013. It attempts to describe the progr...

  19. Integrated Disease Surveillance in India: Way Forward

    OpenAIRE

    Deepak K. Raut

    2014-01-01

    Integrated Disease Surveillance Project (IDSP) with 9 years of its implementation in India has given a positive impetus to integration of surveillance functions primarily for epidemic prone diseases and decentralized symptoms-based detection of early warning signals of outbreaks at primary health care level. This review is based on systematic literature review through PubMed and Google Scholar databases and published reports of the IDSP from 2005-2013. It attempts to describe the progress ...

  20. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  1. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  2. Surface-water surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Saldi, K.A.; Dirkes, R.L.; Blanton, M.L.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the Surface water on and near the Hanford Site is monitored to determine the potential effects of Hanford operations. Surface water at Hanford includes the Columbia River, riverbank springs, ponds located on the Hanford Site, and offsite water systems directly east and across the Columbia River from the Hanford Site, and offsite water systems directly east and across the Columbia River from the Hanford Site. Columbia River sediments are also included in this discussion. Tables 5.3.1 and 5.3.2 summarize the sampling locations, sample types, sampling frequencies, and sample analyses included in surface-water surveillance activities during 1994. Sample locations are also identified in Figure 5.3.1. This section describes the surveillance effort and summarizes the results for these aquatic environments. Detailed analytical results are reported by Bisping (1995).

  3. Surface-water surveillance

    International Nuclear Information System (INIS)

    Saldi, K.A.; Dirkes, R.L.; Blanton, M.L.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the Surface water on and near the Hanford Site is monitored to determine the potential effects of Hanford operations. Surface water at Hanford includes the Columbia River, riverbank springs, ponds located on the Hanford Site, and offsite water systems directly east and across the Columbia River from the Hanford Site, and offsite water systems directly east and across the Columbia River from the Hanford Site. Columbia River sediments are also included in this discussion. Tables 5.3.1 and 5.3.2 summarize the sampling locations, sample types, sampling frequencies, and sample analyses included in surface-water surveillance activities during 1994. Sample locations are also identified in Figure 5.3.1. This section describes the surveillance effort and summarizes the results for these aquatic environments. Detailed analytical results are reported by Bisping (1995)

  4. Some environmental impacts associated with project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    1976-01-01

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kiloton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. Based on overall results it appears important to give adequate attention to environmental effects resulting from nuclear fracturing experiments

  5. Long-term surveillance plan for the Rifle, Colorado, Disposal site

    International Nuclear Information System (INIS)

    1996-09-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Estes Gulch disposal site in Garfield County, Colorado. The U.S. Environmental Protection Agency (EPA) has developed regulations for the issuance of a general license by the U.S. Nuclear Regulatory Commission (NRC) for the custody and long-term care of UMTRA Project disposal Sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites, will be cared for in a manner that protects the public health and safety and the environment. For each disposal site to be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Estes Gulch disposal site. The general license becomes effective when the NRC concurs with the DOE's determination of completion of remedial action for the Estes Gulch site and the NRC formally accepts this LTSP

  6. UIS BW environmental information system Baden-Wuerttemberg. R+D project INOVUM. Innovative environmental information systems. Phase I 2014/16

    International Nuclear Information System (INIS)

    Weissenbach, Kurt; Schillinger, Wolfgang; Weidemann, Rainer

    2016-01-01

    The R and D project INOVUM of the Ministry for the Environment, Climate and Energy Baden-Wuerttemberg relies on a wide cooperation with partners from government, science and industry to jointly develop governmental environmental information systems. In the focus of this project phase were, e.g. a revision of the framework concept for the Environmental Information System Baden-Wuerttemberg, service-based applications, the development of environmental portals, mobile applications and map services.

  7. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  8. Assessment of environmental projects in official schools in the locality 18 in Bogota

    International Nuclear Information System (INIS)

    Herrera R, Juan Francisco; Reyes S, Lucia; Amaya, Hector Oswaldo T .Gerena Oscar Arturo

    2006-01-01

    It was investigated the current state of de School Environment Projects in the public educational institutions of de Town 18 Rafael Uribe Uribe in Bogota (Colombia). The participation grade was measured in the design o execution and evaluation of the environmental projects, the registration and systematising of experiences, the generation of reflection spaces and the structuring to the Institutional Educational Project. By means of the test pilot the variables were determined for the sample design and the validation of the mensuration instrument. Three populations study object were determined and for each was designed a for through which the information of the variable was gathered by means of the method of direct interview. The results show that the overwhelming majority of the considered population didn't participated in the design in the execution of the environmental projects. The registration and systematizing of experiences are minimum, as well as the reflection spaces and conceptualization. There is not articulation from the environmental project to the Institutional Educational Project. The little participation, systematizing of experiences and lack of reflection spaces and conceptualization limit the impact of the School Environmental Projects in the formation of favorable attitudes to the environment

  9. Uranium mining environmental restoration project (PRAMU)

    International Nuclear Information System (INIS)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  10. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Science.gov (United States)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  11. Data sharing report characterization of the surveillance and maintenance project miscellaneous process inventory waste items Oak Ridge National Laboratory, Oak Ridge, TN

    Energy Technology Data Exchange (ETDEWEB)

    Weaver, Phyllis C. [Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)—using the approved Waste Lot (WL) 108.1 profile—the Y-12 Sanitary Landfill (SLF) if appropriate; Energy

  12. Development of Reconstitution Technology for Surveillance Specimens

    International Nuclear Information System (INIS)

    Yasushi Atago; Shunichi Hatano; Eiichiro Otsuka

    2002-01-01

    The Japan Power Engineering and Inspection Corporation (JAPEIC) has been carrying out the project titled 'Nuclear Power Plant Integrated Management Technology (PLIM)' consigned by Japanese Ministry of Economy, Trade and Industry (METI) since 1996FY as a 10-years project. As one of the project themes, development of reconstitution technology for reactor pressure vessel (RPV/RV) surveillance specimens, which are installed in RPVs to monitor the neutron irradiation embrittlement on RPV/RV materials, is now on being carried out to deal with the long-term operation of nuclear power plants. The target of this theme is to establish the technical standard for applicability of reconstituted surveillance specimens including the reconstitution of the Charpy specimens and Compact Tension (CT) specimens. With the Charpy specimen reconstitution, application of 10 mm length inserts is used, which enables the conversion of tests from the LT-direction to the TL-direction. This paper presents the basic data from Charpy and CT specimens of RPV materials using the surveillance specimens obtained for un-irradiated materials including the following. 1) Reconstitution Technology of Charpy Specimens. a) The interaction between plastic zone and Heat Affected Zone (HAZ). b) The effects of the possible deviations from the standard specimens for the reconstituted specimens. 2) Reconstitution Technology of CT specimens. a) The correlation between fracture toughness and plastic zone width. Because the project is now in progress, this paper describes the outline of the results obtained as of the end of 2000 FY. (authors)

  13. Housing projects in Trabzon: Marketting discourses and physical environmental features

    OpenAIRE

    AYDIN TÜRK, Yelda; KARADENİZ, Beyza

    2018-01-01

    Thehousing projects, that have turned into concept projects promoted as acommodity since last decade in Turkey. These projects, are marketed withdiscourses such as “the long-awaited life”, “ideal home” and are constructed onthe urban fringes. In this study, the housing projects that developed inTrabzon in recent years have been examined in this context. Marketing discourseand physical environmental characteristics of the projects have been analyzed.Thus, the study finds out to what extent the...

  14. Field verification of social and environmental issues of selected water sector projects in Punjab-Pakistan

    International Nuclear Information System (INIS)

    Ayesha, A.

    2012-01-01

    Irrigation helps in increasing the agricultural yield and the irrigation projects are carried out for the welfare of people. The importance of environment for sustainable development of irrigation projects has been realized. Environmental Impact Assessment is being increasingly used as a tool for appropriate environmental planning. In Pakistan, PEP A (Pakistan Environmental Protection Act),1997 establishes the framework to carry out Environmental Assessment of development projects. Various national and international agencies have developed Environmental Assessment Guidelines and Checklists for systematic evaluation of environmental impacts and their mitigation. The Social and Environmental Management Unit of Punjab Irrigation and Drainage Authority developed checklist for assessment of irrigation projects in 2007. The present study was conducted on three water sector projects namely: Concrete Lining of Dhudi Minor, Improving Nikki Deg Drain System and Rehabilitation of Khanki Barrage. The field verification of social and environmental issues of the projects was carried out according to the checklist of Social and Environmental Management Unit. The most noticeable impacts which were identified include: extended canal closure, emissions and effluents, waste generation and disposal, effect on flora, public health and safety, land acquisition, and social issues. The mitigatory measures proposed: proper project scheduling to minimize the canal closure periods, waste disposal through proper planning, preparation of detailed resettlement action plans and compensation, location of labor camps away from the settlements, avoiding unnecessary cutting of trees, and deployed machinery should be in good working condition. The recommendations of the study are to review and improve the checklists through a gradual and phased process into a more comprehensive social and environmental assessment process; capacity building of all the stake holders; collaboration between different

  15. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects

    International Nuclear Information System (INIS)

    Morimoto, Risako

    2013-01-01

    Before commissioning any energy projects, conducting robust assessments of different options in terms of their economic and socio-environmental impacts is important for successful project implementation. Yet, there is currently a lack of tools that simultaneously assess sustainability impacts; instead, they are often investigated separately, which gives decision makers somehow disintegrated information. Thus the main objective of this study is to examine how to incorporate socio-environmental considerations into project assessment models. The multi-criteria analysis is applied to the case study of Sri Lankan hydropower projects as an illustrative example. The estimated quantitative relationship between economic, environmental and social impacts of hydropower development is presented in this study. Such estimation, using sustainability indicators of hydropower projects, enables us to understand marginal trade-offs among economic, environmental and social objectives of hydropower development. Hence, this would provide an overview of potential impacts of different scenarios that are designed to be implemented and indicate an optimum mix of hydropower generation. - Highlights: • This study provides an effective hydropower project evaluation method using the MCA. • The proposed tool shows the quantitative relationship explicitly. • Marginal trade-offs between sustainability objectives are presented

  16. 1994 site environmental report, Tonopah Test Range, Tonopah, Nevada

    International Nuclear Information System (INIS)

    Culp, T.; Forston, W.

    1995-09-01

    This report summarizes the environmental surveillance activities conducted by Sandia National Laboratories, the US Environmental Protection Agency, and Kirk-Mayer, Inc., for the Tonopah Test Range operated by Sandia National Laboratories. Sandia National Laboratories' responsibility for environmental surveillance results extends to those activities performed by Sandia National Laboratories or under its direction. Results from other environmental surveillance activities are included to provide a measure of completeness in reporting. Other environmental compliance programs such as the National Environmental Policy Act of 1969, environmental permits, and environmental restoration and waste management programs are also included in this report, prepared for the US Department of Energy (DOE) in compliance with DOE Order 5400. 1

  17. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  18. Hanford Site environmental data for calendar year 1989, surface and Columbia River

    International Nuclear Information System (INIS)

    Bisping, L.E.; Woodruff, R.K.

    1990-06-01

    Environmental monitoring at the Hanford Site, located in southeastern Washington State, is conducted by Battelle Memorial Institute, Pacific Northwest Division, as part of its contract to operate the Pacific Northwest Laboratory (PNL) for the US Department of Energy. The data collected provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor chemicals on the site and in the Columbia River. Pacific Northwest Laboratory publishes an annual environmental report Hanford Site Environmental Report for Calendar Year 1989. That report is a comprehensive source of offsite and onsite environmental monitoring data collected during 1989 by PNL's Environmental Monitoring Program. Appendix C of that report contains data summaries created from raw surface and river monitoring data. This volume contains the actual raw data used to create the summaries. Ground-water monitoring data will be available separately. Questions concerning the data appearing here can be directed to R. K. Woodruff, PNL Project Manager, Surface Environmental Surveillance Project

  19. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  20. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  1. Avian influenza shedding patterns in waterfowl: implications for surveillance, environmental transmission, and disease spread

    Science.gov (United States)

    Henaux, Viviane; Samuel, Michael D.

    2011-01-01

    Despite the recognized importance of fecal/oral transmission of low pathogenic avian influenza (LPAI) via contaminated wetlands, little is known about the length, quantity, or route of AI virus shed by wild waterfowl. We used published laboratory challenge studies to evaluate the length and quantity of low pathogenic (LP) and highly pathogenic (HP) virus shed via oral and cloacal routes by AI-infected ducks and geese, and how these factors might influence AI epidemiology and virus detection. We used survival analysis to estimate the duration of infection (from virus inoculation to the last day virus was shed) and nonlinear models to evaluate temporal patterns in virus shedding. We found higher mean virus titer and longer median infectious period for LPAI-infected ducks (10–11.5 days in oral and cloacal swabs) than HPAI-infected ducks (5 days) and geese (7.5 days). Based on the median bird infectious dose, we found that environmental contamination is two times higher for LPAI- than HPAI-infectious ducks, which implies that susceptible birds may have a higher probability of infection during LPAI than HPAI outbreaks. Less environmental contamination during the course of infection and previously documented shorter environmental persistence for HPAI than LPAI suggest that the environment is a less favorable reservoir for HPAI. The longer infectious period, higher virus titers, and subclinical infections with LPAI viruses favor the spread of these viruses by migratory birds in comparison to HPAI. Given the lack of detection of HPAI viruses through worldwide surveillance, we suggest monitoring for AI should aim at improving our understanding of AI dynamics (in particular, the role of the environment and immunity) using long-term comprehensive live bird, serologic, and environmental sampling at targeted areas. Our findings on LPAI and HPAI shedding patterns over time provide essential information to parameterize environmental transmission and virus spread in predictive

  2. Mound Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bauer, L.R.; Tullis, M.S.; Paulick, R.P.; Roush, L.L.

    1994-07-01

    The purpose of this Environmental Monitoring Plan (EMP) is to describe the environmental monitoring and surveillance programs in place at Mound. The Plan is required by DOE Order 5400.1 (DOE, 1990). The programs described in the EMP are required by the DOE 5400 Order series and by the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environment Surveillance (DOE 1991a), referred to as the Regulatory Guide throughout this Plan

  3. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  4. Rinderpest surveillance

    International Nuclear Information System (INIS)

    2003-01-01

    Rinderpest is probably the most lethal virus disease of cattle and buffalo and can destroy whole populations; damaging economies; undermining food security and ruining the livelihood of farmers and pastoralists. The disease can be eradicated by vaccination and control of livestock movement. The Department of Technical Co-operation is sponsoring a programme, with technical support from the Joint FAO/IAEA Division to provide advice, training and materials to thirteen states through the 'Support for Rinderpest Surveillance in West Asia' project. (IAEA)

  5. Environmental management of uranium mining projects in Australia - a national perspective

    International Nuclear Information System (INIS)

    Usback, R.

    1987-01-01

    The environmental management of uranium mining projects in Australia is described. The paper reveals that the environmental examination of uranium mining proposals, and the establishment of environmental protection measures for such proposals, have been integrated with other requirements to meet the needs of local communities. (U.K.)

  6. Discussion on the method of environmental radiological impact assessment for the highway construction project

    International Nuclear Information System (INIS)

    Qiu Guohua

    2008-01-01

    Based on the characteristics and environmental radiological impact of the highway construction project, the basic procedure of environmental radiological impact assessment for the highway construction project is put forward, including analysis and determination of contamination sources, selection of evaluation factors, determination of assessment range and dose limit, environmental investigation, environmental impact prediction and assessment. The working method of each procedure is analyzed. (authors)

  7. Italian network for obesity and cardiovascular disease surveillance: a pilot project.

    Science.gov (United States)

    Donfrancesco, Chiara; Lo Noce, Cinzia; Brignoli, Ovidio; Riccardi, Gabriele; Ciccarelli, Paola; Dima, Francesco; Palmieri, Luigi; Giampaoli, Simona

    2008-09-29

    Also in Mediterranean countries, which are considered a low risk population for cardiovascular disease (CVD), the increase in body mass index (BMI) has become a public health priority. To evaluate the feasibility of a CVD and obesity surveillance network, forty General Practitioners (GPs) were engaged to perform a screening to assess obesity, cardiovascular risk, lifestyle habits and medication use. A total of 1,046 women and 1,044 men aged 35-74 years were randomly selected from GPs' lists stratifying by age decade and gender. Anthropometric and blood pressure measurements were performed by GPs using standardized methodologies. BMI was computed and categorized in normal weight (BMI 18.5-24.9 kg/m2), overweight (BMI 25.0-29.9 kg/m2) and obese (BMI > or = 30 kg/m2). Food frequency (per day: fruits and vegetables; per week: meat, cheese, fish, pulses, chocolate, fried food, sweet, wholemeal food, rotisserie food and sugar drink) and physical activity (at work and during leisure time) were investigated through a questionnaire. CVD risk was assessed using the Italian CUORE Project risk function. The percentage of missing values was very low. Prevalence of overweight was 34% in women and 50% in men; prevalence of obesity was 23% in both men and women. Level of physical activity was mostly low or very low. BMI was inversely associated with consumption of pulses, rotisserie food, chocolate, sweets and physical activity during leisure time and directly associated with consumption of meat. Mean value of total cardiovascular risk was 4% in women and 11% in men. One percent of women and 16% of men were at high cardiovascular risk (> or = 20% in 10 years). Normal weight persons were four times more likely to be at low risk than obese persons. This study demonstrated the feasibility of a surveillance network of GPs in Italy focusing on obesity and other CVD risk factors. It also provided information on lifestyle habits, such as diet and physical activity.

  8. Italian network for obesity and cardiovascular disease surveillance: A pilot project

    Directory of Open Access Journals (Sweden)

    Palmieri Luigi

    2008-09-01

    Full Text Available Abstract Background Also in Mediterranean countries, which are considered a low risk population for cardiovascular disease (CVD, the increase in body mass index (BMI has become a public health priority. To evaluate the feasibility of a CVD and obesity surveillance network, forty General Practitioners (GPs were engaged to perform a screening to assess obesity, cardiovascular risk, lifestyle habits and medication use. Methods A total of 1,046 women and 1,044 men aged 35–74 years were randomly selected from GPs' lists stratifying by age decade and gender. Anthropometric and blood pressure measurements were performed by GPs using standardized methodologies. BMI was computed and categorized in normal weight (BMI 18.5–24.9 kg/m2, overweight (BMI 25.0–29.9 kg/m2 and obese (BMI ≥ 30 kg/m2. Food frequency (per day: fruits and vegetables; per week: meat, cheese, fish, pulses, chocolate, fried food, sweet, wholemeal food, rotisserie food and sugar drink and physical activity (at work and during leisure time were investigated through a questionnaire. CVD risk was assessed using the Italian CUORE Project risk function. Results The percentage of missing values was very low. Prevalence of overweight was 34% in women and 50% in men; prevalence of obesity was 23% in both men and women. Level of physical activity was mostly low or very low. BMI was inversely associated with consumption of pulses, rotisserie food, chocolate, sweets and physical activity during leisure time and directly associated with consumption of meat. Mean value of total cardiovascular risk was 4% in women and 11% in men. One percent of women and 16% of men were at high cardiovascular risk (≥ 20% in 10 years. Normal weight persons were four times more likely to be at low risk than obese persons. Conclusion This study demonstrated the feasibility of a surveillance network of GPs in Italy focusing on obesity and other CVD risk factors. It also provided information on lifestyle habits

  9. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1997-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  10. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1996-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  11. Secure surveillance videotapes

    International Nuclear Information System (INIS)

    Resnik, W.M.; Kadner, S.P.; Olsen, R.; Chitumbo, K.; Pepper, S.

    1995-01-01

    With assistance from the US Program for Technical Assistance to IAEA Safeguards (POTAS), Aquila Technologies Group developed the Tamper-Resistant Analog Media (TRAM-1000) system to provide standard VHS surveillance video tapes with an enhanced tamper-indicating capability. This project represents further implementation of the partnership approach in facilities including light water reactors with MOX facilities. These facilities use Uniplex Digiquad system video tapes. The partnership approach ensures that one organization can exchange the tapes in a machine without the presence of the other, without losing continuity of information. The TRAM-1000 system development project was accomplished in two stages. In the first stage of the project, the original system delivered to the IAEA, consists of three parts: (1) the tamper detection unit, (2) a specially augmented VHS video tape, and (3) an HP-95 reader. The tamper detection unit houses a VACOSS active fiber-optic seal and an electronic identification tag (E-TAG) reader. In the second stage of the project, the original TRAM-1000 was modified to its current design based on agency input. After delivery of the original TRAM-1000 system to the IAEA, it was reviewed by inspectors. The inspectors felt that the initial system's tape storage/transport method could be simplified. Rather than threading the fiber through the tape spindles, the inspectors suggested that the tape be placed in a bag capable of being sealed. Also, a more flexible fiber-optic cable was recommended. As a result of these suggestions, Aquila developed a tamper-proof bag specifically for holding a surveillance video tape and sealable with a VACOSS fiber optical seal

  12. Impacts and environmental administration in development projects: instruments for the political fixation

    International Nuclear Information System (INIS)

    Angel Sanint, Enrique

    1999-01-01

    Inside the scheme of the necessary environmental administration to evaluate, to mitigate, to correct and to compensate the environmental impacts of a development project the acting diagram is presented, belonging to the multi-objective analysis, like an interesting tool that contributes to consider restrictions and to keep in mind the economic aspect inside the process of politics fixation for the interaction between the environmental authority and the developers of projects in the three basic instances contemplated by the legislation like interaction points

  13. Capacity building efforts and perceptions for wildlife surveillance to detect zoonotic pathogens: comparing stakeholder perspectives.

    Science.gov (United States)

    Schwind, Jessica S; Goldstein, Tracey; Thomas, Kate; Mazet, Jonna A K; Smith, Woutrina A

    2014-07-04

    The capacity to conduct zoonotic pathogen surveillance in wildlife is critical for the recognition and identification of emerging health threats. The PREDICT project, a component of United States Agency for International Development's Emerging Pandemic Threats program, has introduced capacity building efforts to increase zoonotic pathogen surveillance in wildlife in global 'hot spot' regions where zoonotic disease emergence is likely to occur. Understanding priorities, challenges, and opportunities from the perspectives of the stakeholders is a key component of any successful capacity building program. A survey was administered to wildlife officials and to PREDICT-implementing in-country project scientists in 16 participating countries in order to identify similarities and differences in perspectives between the groups regarding capacity needs for zoonotic pathogen surveillance in wildlife. Both stakeholder groups identified some human-animal interfaces (i.e. areas of high contact between wildlife and humans with the potential risk for disease transmission), such as hunting and markets, as important for ongoing targeting of wildlife surveillance. Similarly, findings regarding challenges across stakeholder groups showed some agreement in that a lack of sustainable funding across regions was the greatest challenge for conducting wildlife surveillance for zoonotic pathogens (wildlife officials: 96% and project scientists: 81%). However, the opportunity for improving zoonotic pathogen surveillance capacity identified most frequently by wildlife officials as important was increasing communication or coordination among agencies, sectors, or regions (100% of wildlife officials), whereas the most frequent opportunities identified as important by project scientists were increasing human capacity, increasing laboratory capacity, and the growing interest or awareness regarding wildlife disease or surveillance programs (all identified by 69% of project scientists). A One

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2005

    International Nuclear Information System (INIS)

    West Valley Nuclear Services Company WVNSCO and URS Group, Inc.

    2006-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs

  15. Geothermal environmental projects publication list with abstracts 1975-1978

    Energy Technology Data Exchange (ETDEWEB)

    Ricker, Y.E.; Anspaugh, L.R.

    1979-05-15

    This report contains 119 abstracts of publication resulting from or closely related to geothermal environmental projects conducted by the Environmental Sciences Division at Lawrence Livermore Laboratory. Publications are listed chronologically from 1975 through 1978. The main entries are numbered sequentially, and include the full citation, an abstract, and selected keywords. This section is followed by an author index, and a keyword index.

  16. A Super-resolution Reconstruction Algorithm for Surveillance Video

    Directory of Open Access Journals (Sweden)

    Jian Shao

    2017-01-01

    Full Text Available Recent technological developments have resulted in surveillance video becoming a primary method of preserving public security. Many city crimes are observed in surveillance video. The most abundant evidence collected by the police is also acquired through surveillance video sources. Surveillance video footage offers very strong support for solving criminal cases, therefore, creating an effective policy, and applying useful methods to the retrieval of additional evidence is becoming increasingly important. However, surveillance video has had its failings, namely, video footage being captured in low resolution (LR and bad visual quality. In this paper, we discuss the characteristics of surveillance video and describe the manual feature registration – maximum a posteriori – projection onto convex sets to develop a super-resolution reconstruction method, which improves the quality of surveillance video. From this method, we can make optimal use of information contained in the LR video image, but we can also control the image edge clearly as well as the convergence of the algorithm. Finally, we make a suggestion on how to adjust the algorithm adaptability by analyzing the prior information of target image.

  17. Final report for SNL/NM environmental drilling project

    International Nuclear Information System (INIS)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of open-quotes cut/thrust and compact cuttings without adding large quantities of fluidclose quotes to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal

  18. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  19. Radioactive waste disposal areas and associated environmental surveillance data at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Oakes, T.W.; Shank, K.E.

    1979-12-01

    Environmental surveillance data have been collected around radioactive waste disposal areas for the past thirty years at Oak Ridge National Laboratory (ORNL). The wealth of data collected around the ORNL radioactive waste burial grounds is presented in this review. The purpose of this paper is to describe the solid waste burial grounds in detail along with the environmental monitoring data. The various monitoring systems are reviewed, and the liquid discharge trends are discussed. Monitoring at White Oak Dam, the last liquid control point for the Laboratory, was started in the late 1940's and is continuing. Presently, a network of five environmental monitoring stations is in operation to monitor the radionuclide content of surface waters in the White Oak Creek watershed. Facts observed during the lifetime of the disposal sites include: (1) a large amount of 106 Ru released during 1959 to 1964 due to the fact that Conasauga shale did not retain this element as well as it retained other radionuclides. (2) Large quantities of tritiated water have been released to the Clinch River in recent years, but, from a practical standpoint, little can be done to inhibit or control these releases. (3) A general downward trend in the number of curies released has been observed for all other radionuclides. A number of corrective measures that have been initiated at ORNL to reduce the radioactive liquid discharges are outlined in the paper

  20. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  1. Environmental surveillance of the US Department of Energy Portsmouth Gaseous Diffusion Plant and surrounding environs during 1986: Volume 4

    International Nuclear Information System (INIS)

    Oakes, T.W.; Wiehle, W.E.; Valentine, B.L.

    1987-04-01

    This report provides monitoring data for the installation and surrounding environs that may have been affected by operations on the plant site; provides detailed information about the installation; provides detailed information on input and assumption used in all calculations; integrates monitoring data and related studies in one document to pull together, highlight, and summarize the information contained in many documents; provides trend analyses, where possible, to indicate increases and decreases in environmental conditions; and provides general information on the plant site and quality assurance. Routine monitoring and sampling for radiation, radioactive materials, and chemical substances on and off the DOE reservation and PORTS are used to document compliance with appropriate standards, identify trends, provide information for the public, and contribute to general environmental knowledge. The surveillance program assists in fulfilling the DOE policy of protecting the public, employees, and the environment from harm that could be caused by its activities and reducing negative environmental impacts to the greatest degree practicable. Environmental monitoring information complements data on specific releases, trends, and summaries. 68 refs., 203 figs., 112 tabs

  2. Environmental impacts associated with Project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. Radiation and ground motion are unique to this type experiment while conventional activities would be associated with any type of resource development. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. (U.S.)

  3. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  4. Water radiological surveillance (II)

    International Nuclear Information System (INIS)

    Pablo San Martin de, M.

    2008-01-01

    This paper summarizes the characteristics of the Environmental Surveillance Radiological Networks (ESRN) currently operating in CEDEX. In the first part, the Spanish Continental Waters ESRN has been presented. This second one describes Spanish Costal Waters ESRN and the High Sensitivity Networks in Continental and Marine Waters. It also presents the Radiological Surveillance of Drinking Waters that CEDEX carries out in waters of public consumption management by the Canal de Isabel II (CYII) and by the Mancomunity of Canals Taibilla (M.C.T.). The legislation applicable in each case is reviewed as well. Due to its extension the article has been divided into two parts. As Spanish Continental Waters ESRN has been reviewed in the first part, the others ESRN are discussed in this second one. (Author) 10 refs

  5. Chronic condition self-management surveillance: what is and what should be measured?

    Science.gov (United States)

    Ruiz, Sarah; Brady, Teresa J; Glasgow, Russell E; Birkel, Richard; Spafford, Michelle

    2014-06-19

    The rapid growth in chronic disease prevalence, in particular the prevalence of multiple chronic conditions, poses a significant and increasing burden on the health of Americans. Maximizing the use of proven self-management (SM) strategies is a core goal of the US Department of Health and Human Services. Yet, there is no systematic way to assess how much SM or self-management support (SMS) is occurring in the United States. The purpose of this project was to identify appropriate concepts or measures to incorporate into national SM and SMS surveillance. A multistep process was used to identify candidate concepts, assess existing measures, and select high-priority concepts for further development. A stakeholder survey, an environmental scan, subject matter expert feedback, and a stakeholder priority-setting exercise were all used to select the high-priority concepts for development. The stakeholder survey gathered feedback on 32 candidate concepts; 9 concepts were endorsed by more than 66% of respondents. The environmental scan indicated few existing measures that adequately reflected the candidate concepts, and those that were identified were generally specific to a defined condition and not gathered on a population basis. On the basis of the priority setting exercises and environmental scan, we selected 1 concept from each of 5 levels of behavioral influence for immediate development as an SM or SMS indicator. The absence of any available measures to assess SM or SMS across the population highlights the need to develop chronic condition SM surveillance that uses national surveys and other data sources to measure national progress in SM and SMS.

  6. Release monitoring and environmental surveillance of Cea centers. Assessment and regulation and method 1999

    International Nuclear Information System (INIS)

    2000-01-01

    The quality of the natural environment around the centers of the Commissariat a l Energie Atomique is an important point of its safety policy. The environmental protection is based on the control of risks coming from research and development activities of its installations. It aims to reduce as low as possible, the impact of its activities on man and his environment. This publication develops the sampling and measurement methods that are made on effluents and in environment, according to the radionuclides characteristics, that are present. It gives also the regulation that applied to the effluents monitoring. The results of radioactive effluents releases (liquid and gaseous) and the surveillance of environment around cea centers is given in the 'Bilan 1999' publication. An analysis of these results on the 1995-1999 period allows to follow their evolution. (N.C.)

  7. Secure Video Surveillance System (SVSS) for unannounced safeguards inspections

    International Nuclear Information System (INIS)

    Galdoz, Erwin G.; Pinkalla, Mark

    2010-01-01

    The Secure Video Surveillance System (SVSS) is a collaborative effort between the U.S. Department of Energy (DOE), Sandia National Laboratories (SNL), and the Brazilian-Argentine Agency for Accounting and Control of Nuclear Materials (ABACC). The joint project addresses specific requirements of redundant surveillance systems installed in two South American nuclear facilities as a tool to support unannounced inspections conducted by ABACC and the International Atomic Energy Agency (IAEA). The surveillance covers the critical time (as much as a few hours) between the notification of an inspection and the access of inspectors to the location in facility where surveillance equipment is installed. ABACC and the IAEA currently use the EURATOM Multiple Optical Surveillance System (EMOSS). This outdated system is no longer available or supported by the manufacturer. The current EMOSS system has met the project objective; however, the lack of available replacement parts and system support has made this system unsustainable and has increased the risk of an inoperable system. A new system that utilizes current technology and is maintainable is required to replace the aging EMOSS system. ABACC intends to replace one of the existing ABACC EMOSS systems by the Secure Video Surveillance System. SVSS utilizes commercial off-the shelf (COTS) technologies for all individual components. Sandia National Laboratories supported the system design for SVSS to meet Safeguards requirements, i.e. tamper indication, data authentication, etc. The SVSS consists of two video surveillance cameras linked securely to a data collection unit. The collection unit is capable of retaining historical surveillance data for at least three hours with picture intervals as short as 1sec. Images in .jpg format are available to inspectors using various software review tools. SNL has delivered two SVSS systems for test and evaluation at the ABACC Safeguards Laboratory. An additional 'proto-type' system remains

  8. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    International Nuclear Information System (INIS)

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-01-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  9. Environmental impacts of dispersed development from federal infrastructure projects.

    Science.gov (United States)

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  10. The impacts of the 1995 financial institution environmental guidelines on power projects

    International Nuclear Information System (INIS)

    Weaver, K.L.; Schott, G.A.

    1996-01-01

    In 1995, two of the most influential international financial institutions, The World Bank and The US Export-Import Bank (Ex-Im Bank) issued new environmental guidelines. These guidelines, particularly the World Bank guidelines, are used as a benchmark for evaluating the environmental acceptability of a project by many financial institutions, project developers, private investors, the public, and many developing countries. The impact of these guidelines must be well understood by developers of power projects in order to obtain the necessary financing, in addition to attracting investors, and obtaining national approvals and general public acceptance

  11. Cincinnati, Ohio: Two environmental projects in danger of being misunderstood

    International Nuclear Information System (INIS)

    DeJong, K.A.

    1992-01-01

    The Mill Creek Flood Control and the Fernald Decontamination projects are major environmental issues in the (sub)urban setting of Cincinnati. Flood control of the Mill Creek, a tributary of the Ohio River that bisects Cincinnati, was initiated after a flood with $3 million damage in 1959. Its costs were originally estimated at $42 million (1970) and later at $106 million (1976); $110 million has now been spent and the total cost may reach $313 million in the year 2000 (1992 dollars). Benefit/cost ratios ranging between 2.6:1 and 1.6:1 were used to rationalize this project. Flood frequency of the Mill Creek will be discussed. Decontamination of the suburban Fernald site follows manufacturing of nuclear materials from 1953 until 1989. 149 tons of uranium and thorium wastes were released in the air, 83.5 tons to the Greater Miami River and 5,975 tons were placed in pits, all of which are leaking. The cost to cleanup up the local contamination may exceed $10 billion over a time period of 20--30 years, and the calculation of benefit/cost ratios is complex. The hydrology of the Fernald site will be examined. These two environmental projects are run respectively by the Army Corps of Engineers and the US Department of Energy through large industrial contractors. The projects are in danger of becoming like projects of the ''Military-Industrial Complex'' because of the public's ignorance or misinterpretation of the facts; the argument of public safety, and the huge costs. The role of geologists should include edification of the public about the geological aspects of environmental projects

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2003

    International Nuclear Information System (INIS)

    2004-01-01

    This Annual Site Environmental Report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2003 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. During 2003, cleanup of radioactive waste from the former nuclear fuels reprocessing plant that shut down operations in the 1970s was continued at the WVDP. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority. Work activities at the WVDP during 2003 included: (1) maintaining canisters of vitrified high-level waste in a shielded facility; (2) shipping low-level radioactive waste offsite for disposal; (3) shipping packaged spent nuclear fuel assemblies to Idaho National Engineering and Environmental Laboratory; (4) constructing a facility where large high-activity components can be safely size-reduced and packaged for disposal; (5) decontaminating the fuel storage pool and the cask unloading pool; (6) decontaminating the general purpose cell and the process mechanical cell (also referred to as the head end cells); (7) cleanup of waste in the plutonium purification cell (south) and extraction cell number 2 in the main plant; (8) planning for decontamination and dismantlement of the vitrification facility; (9) continuing preparation of the Decommissioning and/or Long-Term Stewardship Environmental Impact Statement; and (10) monitoring the environment and managing contaminated areas within the Project facility premises

  13. West Valley Demonstration Project site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The West Valley Demonstration Project (WVDP), the site of a US Department of Energy environmental cleanup activity operated by West Valley Nuclear Services Co., Inc., (WVNS), is in the process of solidifying liquid high-level radioactive waste remaining at the site after commercial nuclear fuel reprocessing was discontinued. The Project is located in Western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1996 by environmental monitoring personnel. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. Appendix A is a summary of the site environmental monitoring schedule. Appendix B lists the environmental permits and regulations pertaining to the WVDP. Appendices C through F contain summaries of data obtained during 1996 and are intended for those interested in more detail than is provided in the main body of the report.

  14. Cost-effectiveness of environmental management for vector control in resource development projects.

    Science.gov (United States)

    Bos, R

    1991-01-01

    Vector control methods are traditionally divided in chemical, biological and environmental management approaches, and this distinction also reflected in certain financial and economic aspects. This is particularly true for environmental modification, usually engineering or other structural works. It is highly capital intensive, as opposed to chemical and biological control which require recurrent expenditures, and discount rates are therefore a prominent consideration in deciding for one or the other approach. Environmental manipulation requires recurrent action, but can often be carried out with the community participation, which raises the issue of opportunity costs. The incorporation of environmental management in resource projects is generally impeded by economic considerations. The Internal Rate of Return continues to be a crucial criterion for funding agencies and development banks to support new projects; at the same time Governments of debt-riden countries in the Third World will do their best to avoid additional loans on such frills as environmental and health safeguards. Two approaches can be recommended to nevertheless ensure the incorporation of environmental management measures in resource projects in an affordable way. First, there are several examples of cases where environmental management measures either have a dual benefit (increasing both agricultural production and reducing vector-borne disease transmission) or can be implemented at zero costs. Second, the additional costs involved in structural modifications can be separated from the project development costs considered in the calculations of the Internal Rate of Return, and financial support can be sought from bilateral technical cooperation agencies particularly interested in environmental and health issues. There is a dearth of information in the cost-effectiveness of alternative vector control strategies in the developing country context. The process of integrating vector control in the

  15. Environmental Science and Research Foundation, Inc. annual technical report: Calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, R.D.; Warren, R.W. [eds.

    1998-05-01

    This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation`s mission to DOE-ID provides support in several key areas. The Foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provides environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. Summaries are included of the individual research projects.

  16. Environmental Science and Research Foundation, Inc. annual technical report: Calendar year 1997

    International Nuclear Information System (INIS)

    Reynolds, R.D.; Warren, R.W.

    1998-05-01

    This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation's mission to DOE-ID provides support in several key areas. The Foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provides environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. Summaries are included of the individual research projects

  17. Idaho National Engineering and Environmental Laboratory site environmental report for calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Evans, R.B.; Brooks, R.W.; Roush, D.; Martin, D.B. [Environmental Science and Research Foundation, Idaho Falls, ID (United States); Lantz, B.S. [Dept. of Energy, Idaho Falls, ID (United States). Idaho Operations Office

    1998-08-01

    To verify that exposures resulting from operations at Department of Energy (DOE) nuclear facilities remain very small, each site at which nuclear activities are conducted operates an environmental surveillance program to monitor the air, water and any other pathway whereby radionuclides from operations might conceivably reach workers and members of the public. Environmental surveillance and monitoring results are reported annually to the DOE-Headquarters. This report presents a compilation of data collected in 1997 for the routine environmental surveillance programs conducted on and around the Idaho National Engineering and Environmental Laboratory (INEEL). The results of the various monitoring programs for 1997 indicated that radioactivity from the INEEL operations could generally not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the INEEL. Although some radioactive materials were discharged during INEEL operations, concentrations in the offsite environment and doses to the surrounding population were far less than state of Idaho and federal health protection guidelines.

  18. Idaho National Engineering and Environmental Laboratory site environmental report for calendar year 1997

    International Nuclear Information System (INIS)

    Evans, R.B.; Brooks, R.W.; Roush, D.; Martin, D.B.; Lantz, B.S.

    1998-08-01

    To verify that exposures resulting from operations at Department of Energy (DOE) nuclear facilities remain very small, each site at which nuclear activities are conducted operates an environmental surveillance program to monitor the air, water and any other pathway whereby radionuclides from operations might conceivably reach workers and members of the public. Environmental surveillance and monitoring results are reported annually to the DOE-Headquarters. This report presents a compilation of data collected in 1997 for the routine environmental surveillance programs conducted on and around the Idaho National Engineering and Environmental Laboratory (INEEL). The results of the various monitoring programs for 1997 indicated that radioactivity from the INEEL operations could generally not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the INEEL. Although some radioactive materials were discharged during INEEL operations, concentrations in the offsite environment and doses to the surrounding population were far less than state of Idaho and federal health protection guidelines

  19. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    International Nuclear Information System (INIS)

    MITCHELL, R.M.

    2000-01-01

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey

  20. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.M.

    2000-10-12

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey.

  1. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.M.

    2000-09-28

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey.

  2. Radiological surveillance of Remedial Action activities at the processing site, Ambrosia Lake, New Mexico, April 12--16, 1993. Final report

    International Nuclear Information System (INIS)

    1993-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project's Technical Assistance Contractor (TAC) performed a radiological surveillance of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site in Ambrosia Lake, New Mexico. The requirements and attributes examined during the audit were developed from reviewing working-level procedures developed by the RAC. Objective evidence, comments, and observations were verified based on investigating procedures, documentation, records located at the site, personal interviews, and tours of the site. No findings were identified during this audit. Ten site-specific observations, three good practice observations, and five programmatic observations are presented in this report. The overall conclusion from the surveillance is that the radiological aspects of the Ambrosia Lake, New Mexico, remedial action program are performed adequately. The results of the good practice observations indicate that the site health physics (HP) staff is taking the initiative to address and resolve potential issues, and implement suggestions useful to the UMTRA Project. However, potential exists for improving designated storage areas for general items, and the RAC Project Office should consider resolving site-specific and procedural inconsistencies

  3. Experience and development of on-line BWR surveillance system at Onagawa nuclear power station unit-1

    International Nuclear Information System (INIS)

    Kishi, A.; Chiba, K.; Kato, K.; Ebata, S.; Ando, Y.; Sakamoto, H.

    1986-01-01

    ONAGAWA nuclear power station Unit-1 (Tohoku Electric Power Co.) is a BWR-4 nuclear power station of 524 MW electric power which started commercial operation in June 1984. To attain high reliability and applicability for ONAGAWA-1, Tohoku Electric Power Co. and Toshiba started a Research and Development project on plant surveillance and diagnosis from April 1982. Main purposes of this project are to: (1) Develop an on-line surveillance system and acquire its operating experience at a commercial BWR, (2) Assist in plant operation and maintenance by data acquisition and analysis, (3) Develop a new technique for plant surveillance and diagnosis. An outline of the project, operating experience gained from the on-line surveillance system and an introduction to new diagnosis techniques are reported in this paper. (author)

  4. Surveillance and Maintenance Plan for the Plutonium Uranium Extraction (PUREX) Facility

    International Nuclear Information System (INIS)

    Woods, P.J.

    1998-05-01

    This document provides a plan for implementing surveillance and maintenance (S ampersand M) activities to ensure the Plutonium Uranium Extraction (PUREX) Facility is maintained in a safe, environmentally secure, and cost-effective manner until subsequent closure during the final disposition phase of decommissioning. This plan has been prepared in accordance with the guidelines provided in the U.S. Department of Energy (DOE), Office of Environmental Management (EM) Decommissioning Resource Manual (DOE/EM-0246) (DOE 1995), and Section 8.6 of TPA change form P-08-97-01 to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology, et al. 1996). Specific objectives of the S ampersand M program are: Ensure adequate containment of remaining radioactive and hazardous material. Provide security control for access into the facility and physical safety to surveillance personnel. Maintain the facility in a manner that will minimize potential hazards to the public, the environment, and surveillance personnel. Provide a plan for the identification and compliance with applicable environmental, safety, health, safeguards, and security requirements

  5. Hanford Site Environmental Surveillance Data Report for Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-09-28

    This data report contains the actual raw data used to create the tables and summaries in the Hanford Site Environmental Report for Calendar Year 2005. In addition to providing raw data collected during routine sampling efforts in 2005, this data report also includes Columbia River shoreline spring data collected by the PNNL Groundwater Performance Assessment Project, and data from collaborative studies performed by the PNNL during 2005 under partial support by the SESP. Some analytical results were not received in time to include in this report or changes may have occurred to the data following publication.

  6. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment

  7. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  8. Bangladesh Agro-Climatic Environmental Monitoring Project

    Science.gov (United States)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  9. Integrating Project-Based Service-Learning into an Advanced Environmental Chemistry Course

    Science.gov (United States)

    Draper, Alison J.

    2004-01-01

    An active service-learning research work is conducted in the field of advanced environmental chemistry. Multiple projects are assigned to students, which promote individual learning skills, self-confidence as scientists, and a deep understanding of the environmental chemist's profession.

  10. Framework for Identifying Key Environmental Concerns in Marine Renewable Energy Projects- Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, Sharon; Previsic, Mirko; Nelson, Peter; Woo, Sheri

    2010-06-17

    Marine wave and tidal energy technology could interact with marine resources in ways that are not well understood. As wave and tidal energy conversion projects are planned, tested, and deployed, a wide range of stakeholders will be engaged; these include developers, state and federal regulatory agencies, environmental groups, tribal governments, recreational and commercial fishermen, and local communities. Identifying stakeholders’ environmental concerns in the early stages of the industry’s development will help developers address and minimize potential environmental effects. Identifying important concerns will also assist with streamlining siting and associated permitting processes, which are considered key hurdles by the industry in the U.S. today. In September 2008, RE Vision consulting, LLC was selected by the Department of Energy (DoE) to conduct a scenario-based evaluation of emerging hydrokinetic technologies. The purpose of this evaluation is to identify and characterize environmental impacts that are likely to occur, demonstrate a process for analyzing these impacts, identify the “key” environmental concerns for each scenario, identify areas of uncertainty, and describe studies that could address that uncertainty. This process is intended to provide an objective and transparent tool to assist in decision-making for siting and selection of technology for wave and tidal energy development. RE Vision worked with H. T. Harvey & Associates, to develop a framework for identifying key environmental concerns with marine renewable technology. This report describes the results of this study. This framework was applied to varying wave and tidal power conversion technologies, scales, and locations. The following wave and tidal energy scenarios were considered: 4 wave energy generation technologies 3 tidal energy generation technologies 3 sites: Humboldt coast, California (wave); Makapu’u Point, Oahu, Hawaii (wave); and the Tacoma Narrows, Washington (tidal

  11. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  12. Overview of a comprehensive environmental monitoring and surveillance program: The role of fish and wildlife

    International Nuclear Information System (INIS)

    Gray, R.H.

    1988-05-01

    Concern about the effects of potential releases from nuclear and non-nuclear activities on the US Department of Energy's Hanford Site in southeastern Washington has evolved over four decades into a comprehensive environmental monitoring and surveillance program. The program includes field sampling, and chemical and physical analyses of air, surface and ground water, fish and wildlife, soil, foodstuffs, and natural vegetation. In addition to monitoring radioactivity in fish and wildlife, population numbers of key species are determined, usually during the breeding season. Data from monitoring efforts are used to assess the environmental impacts of Hanford operations and calculate the overall radiological dose to humans onsite, at the Site perimeter, or residing in nearby communities. Chinook salmon spawning in the Columbia River at Hanford has increased in recent years with a concomitant increase in winter nesting activity of bald eagles (Haliaeetus leucocephalus). An elk (Cervus elaphus) herd, established by immigration in 1972, is also increasing. Nesting Canada goose (Branta canadensis) and great blue heron (Ardea herodias), and various other animals, e.g., mule deer (Odocoileus hemionus) and coyotes (Canis latrans) are common. Measured exposure to penetrating radiation and calculated radiation doses to the public are well below applicable regulatory limits

  13. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  14. Environmental surveillance in the Marshall Islands: an application of alternative energy sources in the Third World

    International Nuclear Information System (INIS)

    Greenhouse, N.A. Jr.

    1980-01-01

    Recent assessments of potential radiation exposure pathways at Bikini and Enewetak have indicated that doses in excess of current radiation protection guidelines are possible or even likely for persons living in these areas. Rongelap and Utirik Atolls, which were downwind of the 1954 BRAVO event, also received significant fallout; potential radiological problems exist in these areas as well. In view of this prospect, followup environmental monitoring and personnel monitoring programs are being established to maintain our cognizance of radiological conditions, and to take corrective action where necessary. Various aspects of this program require the operation of scientific equipment in remote areas which have no electrical power. In order to solve this problem, windpowered electrical generators were installed on three islands in a planned program through which they will be turned over to the local inhabitants for community use after about two years. This paper describes environmental surveillance efforts for the inhabitants of Pacific Islands who were the recipients of radioactive fallout from US nuclear weapons tests in the Pacific

  15. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Sanchez, Luis E.; Silva-Sanchez, Solange S.

    2008-01-01

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval

  16. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Science.gov (United States)

    2010-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental issues...

  17. Report on the geo-environmental inquiry project, central and eastern Europe

    NARCIS (Netherlands)

    Mattig, U.; Mulder, E.F.J. de

    1998-01-01

    The Commission on Geological Sciences for Environmental Planning (COGEOENVIRONMENT) of IUGS and UNESCO have initiated a joint project to develop a worldwide data base on earthscience-related environmental problems and to assess which geoscientific information is available locally for prevention,

  18. 78 FR 43183 - Notice of Availability for Sharpe Permit Relinquishment Project Environmental Assessment Finding...

    Science.gov (United States)

    2013-07-19

    ... for Sharpe Permit Relinquishment Project Environmental Assessment Finding of No Significant Impact... Relinquishment Project Environmental Assessment (EA) Finding of No Significant Impact (FONSI). SUMMARY: On April... environment. Human environment was interpreted comprehensively to include the natural and physical environment...

  19. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  20. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  1. Radioactive environmental impact assessment for a highway construction project in Guangdong province

    International Nuclear Information System (INIS)

    Qiu Guohua

    2009-01-01

    Based on the field environmental investigation and monitoring result, the radioactive environmental impact for a highway construction project in Guangdong province has been analyzed and assessed and forecacted. (authors)

  2. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    International Nuclear Information System (INIS)

    Goff, S.J.

    2000-01-01

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide

  3. Environmental management audit, Uranium Mill Tailings Remedial Action Project (UMTRA)

    International Nuclear Information System (INIS)

    1993-01-01

    The Office of Environment, Safety and Health (EH) has established, as part of the internal oversight responsibilities within Department of Energy (DOE), a program within the Office of Environmental Audit (EH-24), to conduct environmental audits at DOE's operating facilities. This document contains the results of the Environmental Management Audit of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This Environmental Management Audit was conducted by the DOE's Office of Environmental Audit from October 26 through November 6, 1992. The audit's objective is to advise the Secretary as to the adequacy of UMTRA's environmental programs, and management organization in ensuring environmental protection and compliance with Federal, state, and DOE environmental requirements. This Environmental Management Audit's scope was comprehensive and covered all areas of environmental management with the exception of environmental programs pertaining to the implementation of the requirements of the National Environmental Policy Act (NEPA), which is the responsibility of the DOE Headquarters Office of NEPA Oversight

  4. A comparative study on the Environmental Impact Assessment of industrial projects in Malaysia

    Science.gov (United States)

    Marmaya, E. A.; Mahbub, R.

    2018-02-01

    In the past decade, mankind has been manipulating the natural environment to better suit its needs for providing buildings and infrastructure for residential, commercial, business and industrial purposes. The rapid industrialization that has taken place has generated several issues regarding the environment. Therefore, managing environmental risks in construction projects has been recognized as an important process to achieve the project objectives in terms of time, cost, quality, safety and environmental sustainability. The aim of this research is to assess the environmental impact of industrial projects to the surrounding areas. The impact to the environment can be categorized into several aspects such as ecosystem impact, natural resources impact and public impact. This research employs the quantitative approach, that is, a questionnaire survey targeted at the occupants living in the surrounding areas of the case study location, namely the industrial sites in Sabah Ammonia Urea (SAMUR), Sipitang, Sabah and Lynas Advanced Materials Plant (LAMP), Gebeng Pahang. The findings of the research show that the two projects are perceived to have negative environmental impact especially for land pollution and green-house gas emissions.

  5. Child Maltreatment Surveillance Improvement Opportunities: A Wake County, North Carolina Pilot Project.

    Science.gov (United States)

    Shanahan, Meghan E; Fliss, Mike D; Proescholdbell, Scott K

    2018-01-01

    BACKGROUND As child maltreatment often occurs in private, child welfare numbers underestimate its true prevalence. Child maltreatment surveillance systems have been used to ascertain more accurate counts of children who experience maltreatment. This manuscript describes the results from a pilot child maltreatment surveillance system in Wake County, North Carolina. METHODS We linked 2010 and 2011 data from 3 sources (Child Protective Services, Raleigh Police Department, and Office of the Chief Medical Examiner) to obtain rates of definite and possible child maltreatment. We separately analyzed emergency department visits from 2010 and 2011 to obtain counts of definite and possible child maltreatment. We then compared the results from the surveillance systems to those obtained from Child Protective Services (CPS) data alone. RESULTS In 2010 and 2011, rates of definite child maltreatment were 11.7 and 11.3 per 1,000 children, respectively, when using the linked data, compared to 10.0 and 9.5 per 1,000 children using CPS data alone. The rates of possible maltreatment were 25.3 and 23.8 per 1,000, respectively. In the 2010 and 2011 emergency department data, there were 68 visits and 84 visits, respectively, that met the case definition for maltreatment. LIMITATIONS While 4 data sources were analyzed, only 3 were linked in the current surveillance system. It is likely that we would have identified more cases of maltreatment had more sources been included. CONCLUSION While the surveillance system identified more children who met the case definition of maltreatment than CPS data alone, the rates of definite child maltreatment were not considerably higher than official reports. Rates of possible child maltreatment were much higher than both the definite case definition and child welfare records. Tracking both definite and possible case definitions and using a variety of data sources provides a more complete picture of child maltreatment in North Carolina. ©2018 by the

  6. Hanford Environmental Information System (HEIS) user's manual

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. Data stored in the HEIS are collected under several regulatory programs. Currently these include the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA); the Resource Conservation and Recovery Act of 1976 (RCRA); and the Ground-Water Environmental Surveillance Project, managed by the Pacific Northwest Laboratory. The HEIS is an information system with an inclusive database. The manual, the HEIS User's Manual, describes the facilities available to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines

  7. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  8. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  9. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  10. Status report : Terra Nova project environmental assessment panel : recommendations

    International Nuclear Information System (INIS)

    2002-01-01

    An application to the Canada-Newfoundland Offshore Petroleum Board (CNOPB) was submitted by Petro-Canada on August 5, 1996, notifying of its intent to develop the petroleum resources located at the Terra Nova field. The provincial and federal governments jointly appointed the Terra Nova Project Environmental Panel, and the board of the CNOPB referred to it the application documents for review. The environmental effects, considerations of human safety incorporated into the design and operation of the Project, the general approach to the development and exploitation of the petroleum resources, and the employment and industrial benefits expected to be derived from the Project were the issues under review by the Panel. On April 22, 1997, public hearings into the review began, and the final report was submitted to governments and the Board in August 1997. The report included 75 recommendations. The Project was approved in Decision 97.02 in December 1997, and the Board dealt with each of the recommendations. The respective positions of the Governments of Canada and Newfoundland and Labrador with regard to the recommendations that fell outside the jurisdiction of the Board were made public. A status report on every one of the 75 recommendations is provided in the present report. The recommendation is repeated, the verbatim response taken from Decision 97.02 included, followed by the status of the response. The production operations phase of the Project accounts for approximately 65 per cent of the recommendations. January 20, 2002 was the date the Project was begun

  11. Fifty years of studies on environmental radioactivity in Peru

    International Nuclear Information System (INIS)

    Osores, Jose M.; Gonzales, Susana; Martinez, Jorge; Lopez, Edith; Jara, Raul; Anaya, Aurelio

    2008-01-01

    In May of 1962, due to the explosions carried out by the Commission of Atomic Energy of the United States in the Christmas Island, a group of professionals of the 'Junta de Control de Energia Atomica' of Peru, created in 1957, carried out experimental evaluations of atmospheric radioactivity, obtaining acceptable results regarding those of Naval US Research Laboratory, this was the beginning of the Laboratory of Atmospheric Radioactivity that begins to operate permanently in February of 1964. In 1966, France began a program of nuclear tests in the French Polynesian, generating concern due to the meteorological conditions that could affect the peruvian population. With the support of experts and equipments on the part of the government from France, the Laboratory of Environmental Radioactivity began their activities in August of 1966. At the present time, the Laboratory of Environmental Radioactivity is located in the Nuclear Center RACSO of the 'Instituto Peruano de Energia Nuclear' and it carries out the following programs: Radiological Environmental Surveillance in the Influence Area of the Nuclear Center, Nationwide Radiological Environmental Surveillance, Marine Radiological Environmental Surveillance, Radiological Environmental Surveillance in the Peruvian Antarctic Region and Surveillance of the Radioactive Contamination of Foods. The results of the evaluations of the programs of radiological environmental surveillance, developed nationwide from 1962, show one gradual decrease of the levels of environmental radioactivity. Significant concentrations of Cs-137 and Be-7 were found in the Antarctic region, and, in the area of influence of the nuclear center RACSO, environmental discharges of I-131, Cs-137, Co-60, Cs- 134 and Te-123m were detected, however, the concentrations did not present radiological risk for the population. (author)

  12. Evaluating surveillance indicators supporting the Global Polio Eradication Initiative, 2011-2012.

    Science.gov (United States)

    2013-04-12

    The Global Polio Eradication Initiative (GPEI) was established in 1988 by the World Health Assembly to interrupt transmission of wild poliovirus (WPV); completion of this initiative was declared a programmatic emergency of public health in January 2012. Polio cases are detected through surveillance for acute flaccid paralysis (AFP) with linked stool specimens tested for polioviruses (PVs) at accredited laboratories within the Global Polio Laboratory Network (GPLN). AFP surveillance findings are supplemented by testing sewage samples (environmental surveillance) collected at selected sites. Virologic data guide where targeted immunization activities should be conducted or improved. Key performance indicators are used to 1) monitor AFP surveillance quality at national and subnational levels to identify gaps where PV transmission could occur undetected; 2) provide evidence of where PV circulation has been interrupted; and 3) allow timely detection of an outbreak. Standardized surveillance indicators allow progress to be monitored over time and compared among countries. This report presents AFP surveillance performance indicators at national and subnational levels for countries affected by polio during 2011-2012, and trends in environmental surveillance, updating previous reports. In the 19 countries with transmission of PV (WPV and/or circulating vaccine-derived poliovirus [cVDPV]) during 2011-2012, national performance indicator targets were met in 12 (63%) countries in 2011 and 13 (68%) countries in 2012. Seven countries (37%) in 2011 had ≥80% of the population living in areas meeting performance indicators, increasing to nine countries (47%) in 2012. Performance indicators for timely reporting of PV isolation and characterization were met in four of six World Health Organization (WHO) regions in 2011 and five regions in 2012. To achieve global polio eradication, efforts are needed to improve and maintain AFP surveillance and laboratory performance.

  13. System specification for the integrated monitoring and surveillance system

    International Nuclear Information System (INIS)

    1997-09-01

    This System Specification establishes the requirements for the Plutonium Focus Area (PFA) Integrated Monitoring and Surveillance System (IMSS). In this document, ''Integrated Monitoring and Surveillance System'' is used to describe the concept of integrated sensors, computers, personnel, and systems that perform the functions of sensing conditions, acquiring data, monitoring environmental safety and health, controlling and accounting for materials, monitoring material stability, monitoring container integrity, transferring data, and analyzing, reporting, and storing data. This concept encompasses systems (e.g. sensors, personnel, databases, etc.) that are already in place at the sites but may require modifications or additions to meet all identified surveillance requirements. The purpose of this System Specification is to provide Department of Energy (DOE) sites that store plutonium materials with a consolidation of all known requirements for the storage and surveillance of 3013 packages of stabilized plutonium metals and oxides. This compilation may be used (1) as a baseline for surveillance system design specifications where 3013 packages of stabilized plutonium metals and oxides will be stored and monitored; (2) as a checklist for evaluating existing surveillance systems to ensure that all requirements are met for the storage and surveillance of 3013 packages of stabilized plutonium metals and oxides; and (3) as a baseline for preparing procurement specifications tailored for site specific storage and surveillance of 3013 packages of stabilized plutonium metals and oxides

  14. Using Deep Learning Algorithm to Enhance Image-review Software for Surveillance Cameras

    Energy Technology Data Exchange (ETDEWEB)

    Cui, Yonggang

    2018-05-07

    We propose the development of proven deep learning algorithms to flag objects and events of interest in Next Generation Surveillance System (NGSS) surveillance to make IAEA image review more efficient. Video surveillance is one of the core monitoring technologies used by the IAEA Department of Safeguards when implementing safeguards at nuclear facilities worldwide. The current image review software GARS has limited automated functions, such as scene-change detection, black image detection and missing scene analysis, but struggles with highly cluttered backgrounds. A cutting-edge algorithm to be developed in this project will enable efficient and effective searches in images and video streams by identifying and tracking safeguards relevant objects and detect anomalies in their vicinity. In this project, we will develop the algorithm, test it with the IAEA surveillance cameras and data sets collected at simulated nuclear facilities at BNL and SNL, and implement it in a software program for potential integration into the IAEA’s IRAP (Integrated Review and Analysis Program).

  15. Long-term surveillance plan for the Shiprock Disposal site, Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The long-term surveillance plan (LTSP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Shiprock disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents the land ownership interests and details how the long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  16. Project Management in the Field of Innovative Technologies of Environmental Management

    Directory of Open Access Journals (Sweden)

    Potasheva Galina

    2016-01-01

    Full Text Available The article deals with the application of project management in the field of innovative technologies of environmental management. This article examines the sustainability of integrated development environment, and society in the “three ones” concept, which covers all major aspects of development and global change: ecological, social, economic-based planning. But the transition from the national level to the practice of management in the real institutional environment revealed the unresolved systemic issues such as: economic development is considered at the national level; the management of social processes is in the area of responsibility of regions; environmental issues are concentrated at the local, municipal level. To solve this problem, this article discusses the design aspects of environmental management. So in designing the required high degree of understanding of interdependencies and patterns of organizing itself independently of the system that explains the differences between technical and social design. Technical design relies on mechanistic management, while social planning is understood as a system or organic project management. Hence it is safe to state the fact that project management in the environmental management of the country is concentrated in specific design, planning, technical and management solutions, as well as in the creation interested in these effects in all spheres and strata of society.

  17. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    International Nuclear Information System (INIS)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of ''emerging clean coal technologies'' under the categories of ''in boiler control of oxides of sulfur and nitrogen'' as well as ''post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO 2 ) and nitrogen oxide (NO x ) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs

  18. Dynamic simulation applied to the socio-environmental management in projects of concentrated infrastructure

    International Nuclear Information System (INIS)

    Diaz E, Mauricio; Pena Z, Gloria Elena

    2004-01-01

    This work presents a theoretical and methodological approach to system dynamics utilization to contribute in the comprehension and handle of complexly of management challenges what appears in design, construction and operation phases in concentrate infrastructure projects like as ports, big dams and industrial parks. The localization of this kind of projects generates socio environmental impacts in their influence zones, what requires a strategically management from enterprise owners, not only for to comply with current environmental laws but also ensure social viability of their projects

  19. Short report: Improving record-review surveillance of young children with an autism spectrum disorder.

    Science.gov (United States)

    Wiggins, Lisa D; Robins, Diana L; Yeargin-Allsopp, Marshalyn

    2013-09-01

    Records-based autism spectrum disorder surveillance developed at the Centers for Disease Control and Prevention has been extended to younger cohorts, although the utility of additional record sources has not been examined. We therefore conducted a pilot project to describe whether Centers for Disease Control and Prevention surveillance could identify younger children with an autism spectrum disorder evaluated as part of an ongoing screening study at Georgia State University. In all, 31 families of children who screened positive for autism spectrum disorder and received a clinical evaluation at Georgia State University agreed to participate in the project. Of these, 10 children lived inside the surveillance area and had records abstracted and reviewed for this project. Centers for Disease Control and Prevention surveillance results (i.e. autism spectrum disorder or non-autism spectrum disorder) were compared with Georgia State University evaluation results (i.e. autism spectrum disorder or non-autism spectrum disorder). In all, 4 of the 10 children were diagnosed with an autism spectrum disorder after the Georgia State University evaluation. None of the 4 children with an autism spectrum disorder were identified by current Centers for Disease Control and Prevention surveillance methods but all 4 children were identified by Centers for Disease Control and Prevention surveillance methods when additional record sources were included (i.e. records from the statewide early intervention program and Georgia State University evaluation). These findings suggest that partnering with early intervention programs and encouraging early autism spectrum disorder screening might improve autism spectrum disorder surveillance among young children.

  20. Environmental surveillance at Los Alamos during 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This report describes environmental monitoring activities at Los Alamos National Laboratory for 1994. Data were collected to assess external penetrating radiation, airborne emissions, liquid effluents, radioactivity of environmental materials and food stuffs, and environmental compliance.