  1. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out

  2. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  3. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  4. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  5. Surface Environmental Surveillance Procedures Manual

    International Nuclear Information System (INIS)

    Hanf, Robert W.; Poston, Ted M.

    2000-01-01

    Shows and explains certain procedures needed for surface environmental surveillance. Hanford Site environmental surveillance is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) under the Surface Environmental Surveillance Project (SESP). The basic requirements for site surveillance are set fourth in DOE Order 5400.1, General Environmental Protection Program Requirements. Guidance for the SESP is provided in DOE Order 5484.1, Environmental Protection, Safety, and Health Protection Information Reporting Requirements and DOE Order 5400.5, Radiation Protection of the Public and Environment. Guidelines for environmental surveillance activities are provided in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. An environmental monitoring plan for the Hanford Site is outlined in DOE/RL 91-50 Rev. 2, Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual. Personnel training requirements are documented in SESP-TP-01 Rev.2, Surface Environmental Surveillance Project Training Program.

  6. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    International Nuclear Information System (INIS)

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  7. Surveillance of the environmental radioactivity

    International Nuclear Information System (INIS)

    Schneider, Th.; Gitzinger, C.; Jaunet, P.; Eberbach, F.; Clavel, B.; Hemidy, P.Y.; Perrier, G.; Kiper, Ch.; Peres, J.M.; Josset, M.; Calvez, M.; Leclerc, M.; Leclerc, E.; Aubert, C.; Levelut, M.N.; Debayle, Ch.; Mayer, St.; Renaud, Ph.; Leprieur, F.; Petitfrere, M.; Catelinois, O.; Monfort, M.; Baron, Y.; Target, A.

    2008-01-01

    The objective of these days was to present the organisation of the surveillance of the environmental radioactivity and to allow an experience sharing and a dialog on this subject between the different actors of the radiation protection in france. The different presentations were as follow: evolution and stakes of the surveillance of radioactivity in environment; the part of the European commission, regulatory aspects; the implementation of the surveillance: the case of Germany; Strategy and logic of environmental surveillance around the EDF national centers of energy production; environmental surveillance: F.B.F.C. site of Romans on Isere; steps of the implementation 'analysis for release decree at the F.B.F.C./C.E.R.C.A. laboratory of Romans; I.R.S.N. and the environmental surveillance: situation and perspectives; the part of a non institutional actor, the citizenship surveillance done by A.C.R.O.; harmonization of sampling methods: the results of inter operators G.T. sampling; sustainable observatory of environment: data traceability and samples conservation; inter laboratories tests of radioactivity measurements; national network of environmental radioactivity measurement: laboratories agreements; the networks of environmental radioactivity telemetry: modernization positioning; programme of observation and surveillance of surface environment and installations of the H.A.-M.A.V.L. project (high activity and long life medium activity); Evolution of radionuclides concentration in environment and adaptation of measurements techniques to the surveillance needs; the national network of radioactivity measurement in environment; modes of data restoration of surveillance: the results of the Loire environment pilot action; method of sanitary impacts estimation in the area of ionizing radiations; the radiological impact of atmospheric nuclear tests in French Polynesia; validation of models by the measure; network of measurement and alert management of the atmospheric

  8. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  9. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  10. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  11. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  12. Hanford Site surface environmental surveillance

    International Nuclear Information System (INIS)

    Dirkes, R.L.

    1998-01-01

    Environmental surveillance of the Hanford Site and the surrounding region is conducted to demonstrate compliance with environmental regulations, confirm adherence to US Department of Energy (DOE) environmental protection policies, support DOE environmental management decisions, and provide information to the public. The Surface Environmental Surveillance Project (SESP) is a multimedia environmental monitoring program conducted to measure the concentrations of radionuclides and chemical contaminants in the environment and assess the integrated effects of these contaminants on the environment and the public. The monitoring program includes sampling air, surface water, sediments, soil, natural vegetation, agricultural products, fish, and wildlife. Functional elements inherent in the operation of the SESP include project management, quality assurance/control, training, records management, environmental sampling network design and implementation, sample collection, sample analysis, data management, data review and evaluation, exposure assessment, and reporting. The SESP focuses on those contaminant/media combinations calculated to have the highest potential for contributing to off-site exposure. Results of the SESP indicate that contaminant concentrations in the Hanford environs are very low, generally below environmental standards, at or below analytical detection levels, and indicative of environmental levels. However, areas of elevated contaminant concentrations have been identified at Hanford. The extent of these areas is generally limited to past operating areas and waste disposal sites

  13. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  14. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  15. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  16. An overview of background environmental radiological surveillance around Kudankulam nuclear power project site

    International Nuclear Information System (INIS)

    Rajan, M.P.; Vijayakumar, B.; George, Thomas; Rajan, P.S.; Rana, B.K.; Kumar, M.; Hegde, A.G.; Chougaonkar, M.P.

    2005-01-01

    A modern Environmental Survey Laboratory (ESL) equipped with state-of-art nuclear counting, chemical and ecological equipment's has been set up at Kudankulam at the very beginning of construction activities to carry out pre operational and baseline radioactivity measurements. Construction activities for the two VVER type 1000 MWe reactors at the site are progressing ahead of schedule and the first unit is slated to be critical in the year 2007. This paper presents the results of environmental radiological surveillance carried out for the last one year in Kudankulam environs. General radiation background in the area varies in the range of 0.1 - 0.7 μGy/h and elevated levels as high as 20 μGy/h are noticed in beach areas. The major contribution to the background radiation in high background areas comes from 232 Th and its daughter products. The concentrations of 40 K are of normal order and comparable to other NPP sites and normal background areas. The concentrations of fallout nuclides are very low and are at global fallout levels. (author)

  17. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  18. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  19. Laboratory of environmental radiological surveillance

    International Nuclear Information System (INIS)

    Mendez G, A.; Marcial M, F.; Giber F, J.; Montiel R, E.; Leon del V, E.; Rivas C, I.; Leon G, M.V.; Lagunas G, E.; Aragon S, R.; Juarez N, A.; Alfaro L, M.M.

    1991-12-01

    The department of radiological protection of the ININ requests the collaboration of the Engineering Unit for the elaboration of the work project of the laboratory of environmental radiological surveillance. The emission of radioactive substances to the atmosphere like consequence of the normal operation of the Nuclear Center, constitutes an exhibition source from the man to the radiations that it should be appropriately watched over and controlled to be able to determine the population's potential exhibition that it lives in the area of influence of the installation. (Author)

  20. Surface Environmental Surveillance Procedures Manual

    Energy Technology Data Exchange (ETDEWEB)

    RW Hanf; TM Poston

    2000-09-20

    Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual.

  1. Surface Environmental Surveillance Project: Locations Manual Volume 1 – Air and Water Volume 2 – Farm Products, Soil & Vegetation, and Wildlife

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, Brad G.; Patton, Gregory W.; Stegen, Amanda; Poston, Ted M.

    2009-01-01

    This report describes all environmental monitoring locations associated with the Surface Environmental Surveillance Project. Environmental surveillance of the Hanford site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The environmental surveillance sampling design is described in the Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operation Office (DOE/RL-91-50). This document contains the locations of sites used to collect samples for the Surface Environmental Surveillance Project (SESP). Each section includes directions, maps, and pictures of the locations. A general knowledge of roads and highways on and around the Hanford Site is necessary to successfully use this manual. Supplemental information (Maps, Gazetteer, etc.) may be necessary if user is unfamiliar with local routes. The SESP is a multimedia environmental surveillance effort to measure the concentrations of radionuclides and chemicals in environmental media to demonstrate compliance with applicable environmental quality standards and public exposure limits, and assessing environmental impacts. Project personnel annually collect selected samples of ambient air, surface water, agricultural products, fish, wildlife, and sediments. Soil and vegetation samples are collected approximately every 5 years. Analytical capabilities include the measurement of radionuclides at very low environmental concentrations and, in selected media, nonradiological chemicals including metals, anions, volatile organic compounds, and total organic carbon.

  2. Environmental surveillance at Los Alamos

    International Nuclear Information System (INIS)

    1979-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1978. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1978 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and groundwater, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs

  3. Public involvement in environmental surveillance at Hanford

    International Nuclear Information System (INIS)

    Hanf, R.W. Jr.; Patton, G.W.; Woodruff, R.K.; Poston, T.M.

    1994-08-01

    Environmental surveillance at the Hanford Site began during the mid-1940s following the construction and start-up of the nation's first plutonium production reactor. Over the past approximately 45 years, surveillance operations on and off the Site have continued, with virtually all sampling being conducted by Hanford Site workers. Recently, the US Department of Energy Richland Operations Office directed that public involvement in Hanford environmental surveillance operations be initiated. Accordingly, three special radiological air monitoring stations were constructed offsite, near hanford's perimeter. Each station is managed and operated by two local school teaches. These three stations are the beginning of a community-operated environmental surveillance program that will ultimately involve the public in most surveillance operations around the Site. The program was designed to stimulate interest in Hanford environmental surveillance operations, and to help the public better understand surveillance results. The program has also been used to enhance educational opportunities at local schools

  4. Elements of quality assurance in environmental surveillance

    International Nuclear Information System (INIS)

    Johnson, L.J.

    1975-01-01

    Qualities of an environmental surveillance program requiring control or assurance are reviewed. Requirements of accuracy, reproducibility, sensitivity, acceptability, and time and cost effectiveness are qualities discussed. The controls applicable to sample collection, handling, chemical analysis, measurement and data presentation are identified and discussed as they pertain to environmental monitoring. Quality assurance program recommendations for developing and reporting environmental surveillance data are provided

  5. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  6. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  7. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  8. Surface Environmental Surveillance Procedures Manual, PNL-MA-580, Rev. 5

    Energy Technology Data Exchange (ETDEWEB)

    Hanf, Robert W.; Poston, Ted M.; Bisping, Lynn E.

    2007-07-01

    This manual contains the procedures that are used for the collection of routine Surface Environmental Surveillance Project environmental samples and field measurements on and around the Hanford Site. Specific responsibilities for project personnel are also defined.

  9. Environmental health surveillance system; Kankyo hoken surveillance system

    Energy Technology Data Exchange (ETDEWEB)

    Ono, M. [National Inst. for Environmental Studies, Tsukuba (Japan)

    1998-02-01

    The Central Environmental Pollution Prevention Council pointed out the necessity to establish an environmental health surveillance system (hereinafter referred to as System) in its report `on the first type district specified by the Environmental Pollution Caused Health Damages Compensation Act,` issued in 1986. A study team, established in Environment Agency, has been discussing to establish System since 1986. This paper outlines System, and some of the pilot surveillance results. It is not aimed at elucidation of the cause-effect relationships between health and air pollution but at discovery of problems, in which the above relationships in a district population are monitored periodically and continuously from long-term and prospective viewpoints, in order to help take necessary measures in the early stage. System is now collecting the data of the chronic obstructive lung diseases on a nation-wide scale through health examinations of 3-year-old and preschool children and daily air pollution monitoring. 6 refs., 3 figs., 1 tab.

  10. Master schedule for CY-1979 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1978-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site, as conducted by the Environmental Evaluation Section of Battelle, Pacific Northwest Laboratory for the Department of Energy (DOE), is given. Modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, and to monitor Hanford operations for compliance with applicable environmental criteria and Washington State Water Quality Standards. Air quality data are obtained in a separate program administered by the Hanford Environmental Health Foundation. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Water quality data for Hanford Site potable water systems are published each year by the Hanford Environmental Health Foundation. The data collected are available in routine reports issued by the Environmental Evaluations staff. Groundwater data and evaluation are reported in the series, ''Radiological Status of the Groundwater Beneath the Hanford Project for...,'' the latest issue being PNL-2624 for CY-1977. Data from locations within the plant boundaries are presented in the annual ''Environmental Status of the Hanford Site for...'' report series, the most recent report being PNL-2677 for 1977. Data from offsite locations are presented in the annual ''Environmental Surveillance at Hanford for...'' series of reports, the latest being PNL-2614 for 1977

  11. Community-Operated Environmental Surveillance Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described.

  12. Community-Operated Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described

  13. Manual for environmental radiological surveillance

    International Nuclear Information System (INIS)

    Sumiya, Shuichi; Matsuura, Kenichi; Nakano, Masanao; Takeyasu, Masanori; Morisawa, Masato; Onuma, Toshimitsu; Fujita, Hiroki; Mizutani, Tomoko; Watanabe, Hajime; Sugai, Masamitsu

    2010-03-01

    Environmental radiation monitoring around the Tokai Reprocessing Plant has been conducted by the Nuclear Fuel Cycle Engineering Laboratories, based on 'Safety Regulations for the Reprocessing Plant of JAEA, Chapter IV - Environmental monitoring' and Environmental Radiation Monitoring Program decided by the Ibaraki prefectural government. The radiation monitoring installations and equipments were also prepared for emergency. This manual describes; (1) the installations of radiological measurement, (2) the installations of meteorological observation, and (3) environmental data processing system for executing the terrestrial environmental monitoring by Environmental Protection Section, Radiation Protection Department. The environmental monitoring has been operated through the manual published in 1993 (PNC TN8520 93-001). Then the whole articles were revised because the partially of installations and equipments having been updated in recent years. (author)

  14. Hanford Site Environmental Surveillance Data Report for Calendar Year 2002

    International Nuclear Information System (INIS)

    Bisping, Lynn E.

    2003-01-01

    This data report contains the actual raw data used in the annual Hanford Site environmental report (PNNL--14295). In addition to providing raw data collected during routine sampling in 2002, this report also includes data from special sampling studies performed by PNNL during 2002. Environmental surveillance at the Hanford Site, located in southeastern Washington State, is conducted by Pacific Northwest National Laboratory (PNNL), which is operated by Battelle for the U.S. Department of Energy. The data collected provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River water and sediment. For more information regarding the 2002 sampling schedule for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project, refer to L. E. Bisping, Environmental Surveillance Master Sampling Schedule (PNNL--13418, Pacific Northwest National Laboratory, Richland, Washington). PNNL publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 2002 describes the site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. Sections of the annual environmental report include tables and summaries of offsite and onsite environmental surveillance data collected by PNNL during 2002. This data report contains the actual raw data used to create those tables and summaries. In addition to providing raw data collected during routine sampling efforts in 2002, this data report also includes data from special sampling studies performed by PNNL during 2002

  15. Surface Environmental Surveillance Procedures Manual

    Energy Technology Data Exchange (ETDEWEB)

    Hanf, RW; Dirkes, RL

    1990-02-01

    This manual establishes the procedures for the collection of environmental samples and the performance of radiation surveys and other field measurements. Responsibilities are defined for those personnel directly involved in the collection of samples and the performance of field measurements.

  16. Environmental surveillance at Los Alamos during 2007

    Energy Technology Data Exchange (ETDEWEB)

    Lynch, Michelle; Brady, Doug

    2008-07-01

    Each year, LANL produces an Environmental Surveillance Report (ESR) in compliance with a Department of Energy (DOE) order. The ESR aims to summarize the environmental impacts of the Laboratory, the efforts to minimize these impacts, and LANL’s compliance with environmental regulations. This Summary Report presents the methods and results of environmental monitoring done in 2007 in a form that is more understandable and inviting to the public. Though other DOE sites have done Summary Reports in the past, this is LANL’s first for the ESR, and the authors were privileged to write this report from the perspective of students.

  17. Environmental surveillance at Los Alamos during 2009

    Energy Technology Data Exchange (ETDEWEB)

    Fuehne, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Poff, Ben [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hjeresen, Denny [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Isaacson, John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Johnson, Scot [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Morgan, Terry [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Paulson, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Salzman, Sonja [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Rogers, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2010-09-30

    Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (the Laboratory) environmental organization, as required by US Department of Energy Order 5400.1, General Environmental Protection Program, and US Department of Energy Order 231.1A, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory’s efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory’s major environmental programs and explains the risks and the actions taken to reduce risks at the Laboratory from environmental legacies and waste management operations. Chapter 2 reports the Laboratory’s compliance status for 2009. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations and discusses chemical exposures. The environmental surveillance and monitoring data are organized by environmental media (air in Chapter 4; water and sediments in Chapters 5 and 6; soils in Chapter 7; and foodstuffs and biota in Chapter 8) in a format to meet the needs of a general and scientific audience. Chapter 9 provides a summary of the status of environmental restoration work around LANL. The new Chapter 10 describes the Laboratory’s environmental stewardship efforts and provides an overview of the health of the Rio Grande. A glossary and a list of acronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the Laboratory’s technical

  18. Environmental surveillance at Los Alamos during 2008

    Energy Technology Data Exchange (ETDEWEB)

    Fuehne, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gallagher, Pat [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hjeresen, Denny [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Isaacson, John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Johson, Scot [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Morgan, Terry [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Paulson, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Rogers, David [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2009-09-30

    Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (the Laboratory) Environmental Programs Directorate, as required by US Department of Energy Order 450.1, General Environmental Protection Program, and US Department of Energy Order 231.1A, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory’s efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory’s major environmental programs and explains the risks and the actions taken to reduce risks at the Laboratory from environmental legacies and waste management operations. Chapter 2 reports the Laboratory’s compliance status for 2007. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations and discusses chemical exposures. The environmental surveillance and monitoring data are organized by environmental media (Chapter 4, air; Chapters 5 and 6, water and sediments; Chapter 7, soils; and Chapter 8, foodstuffs and biota) in a format to meet the needs of a general and scientific audience. Chapter 9 provides a summary of the status of environmental restoration work around LANL. A glossary and a list of acronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the Laboratory’s technical areas and their associated programs, and Appendix D provides web links to more information.

  19. Environmental surveillance at Los Alamos during 2005

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-09-30

    Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (LANL or the Laboratory) environmental organization, as required by US Department of Energy Order 5400.1, General Environmental Protection Program, and US Department of Energy Order 231.IA, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory's efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory's major environmental programs. Chapter 2 reports the Laboratory's compliance status for 2005. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations. The environmental surveillance and monitoring data are organized by environmental media (Chapter 4, Air; Chapters 5 and 6, Water and Sediments; Chapter 7, Soils; and Chapter 8, Foodstuffs and Biota) in a format to meet the needs of a general and scientific audience. Chapter 9, new for this year, provides a summary of the status of environmental restoration work around LANL. A glossary and a list ofacronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the Laboratory's technical areas and their associated programs, and Appendix D provides web links to more information.

  20. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  1. New England States environmental radiation surveillance programs

    International Nuclear Information System (INIS)

    Molloy, E.J.

    1980-01-01

    An overview of the environmental radiation surveillance programs in the New England States from the viewpoint of their organization and administration is provided. Moreover, the specific monitoring and analytical programs conducted at selected sites in each state is detailed with emphasis on sample types, collection frequencies, and analysis. Also, a comparison is made between the programs of all the states in order to determine the reasons for their differences

  2. Environmental and ground-water surveillance at Hanford

    International Nuclear Information System (INIS)

    Dirkes, R.L.; Luttrell, S.P.

    1995-01-01

    Environmental and ground-water surveillance of the Hanford Site and surrounding region is conducted to demonstrate compliance with environmental regulations, confirm adherence to DOE environmental protection policies, support DOE environmental management decisions, and provide information to the public. Environmental surveillance encompasses sampling and analyzing for potential radiological and nonradiological chemical contaminants on and off the Hanford Site. Emphasis is placed on surveillance of exposure pathways and chemical constituents that pose the greatest risk to human health and the environment

  3. Environmental and ground-water surveillance at Hanford

    Energy Technology Data Exchange (ETDEWEB)

    Dirkes, R.L.; Luttrell, S.P.

    1995-06-01

    Environmental and ground-water surveillance of the Hanford Site and surrounding region is conducted to demonstrate compliance with environmental regulations, confirm adherence to DOE environmental protection policies, support DOE environmental management decisions, and provide information to the public. Environmental surveillance encompasses sampling and analyzing for potential radiological and nonradiological chemical contaminants on and off the Hanford Site. Emphasis is placed on surveillance of exposure pathways and chemical constituents that pose the greatest risk to human health and the environment.

  4. Environmental Surveillance at Los Alamos during 2007

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-30

    Environmental Surveillance at Los Alamos reports are prepared annually by the Los Alamos National Laboratory (the Laboratory) Environmental Directorate, as required by US Department of Energy Order 450.1, General Environmental Protection Program, and US Department of Energy Order 231.1A, Environment, Safety, and Health Reporting. These annual reports summarize environmental data that are used to determine compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and departmental policies. Additional data, beyond the minimum required, are also gathered and reported as part of the Laboratory’s efforts to ensure public safety and to monitor environmental quality at and near the Laboratory. Chapter 1 provides an overview of the Laboratory’s major environmental programs and explains the risks and the actions taken to reduce risks at the Laboratory from environmental legacies and waste management operations. Chapter 2 reports the Laboratory’s compliance status for 2007. Chapter 3 provides a summary of the maximum radiological dose the public and biota populations could have potentially received from Laboratory operations and discusses chemical exposures. The environmental surveillance and monitoring data are organized by environmental media (Chapter 4, air; Chapters 5 and 6, water and sediments; Chapter 7, soils; and Chapter 8, foodstuffs and biota) in a format to meet the needs of a general and scientific audience. Chapter 9 provides a summary of the status of environmental restoration work around LANL. A glossary and a list of acronyms and abbreviations are in the back of the report. Appendix A explains the standards for environmental contaminants, Appendix B explains the units of measurements used in this report, Appendix C describes the laboratory’s technical areas and their associated programs, and Appendix D provides web links to more information. In printed copies of this report or Executive Summary, we have

  5. Environmental surveillance at Los Alamos during 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This report describes the environmental surveillance program at Los Alamos National Laboratory (LANL or the Laboratory) during 1995. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring result to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1995 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, Laboratory employees, or the environment.

  6. Environmental surveillance at Los Alamos during 1992

    Energy Technology Data Exchange (ETDEWEB)

    Kohen, K.; Stoker, A.; Stone, G. [and others

    1994-07-01

    This report describes the environmental surveillance program at Los Alamos National Laboratory during 1992. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring results to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1992 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, laboratory employees, or the environment.

  7. Environmental surveillance at Los Alamos during 1986

    International Nuclear Information System (INIS)

    1987-04-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1986. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit eartly identification of potentially undesirable trends. Results and interpertation of data for 1986 cover: external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparison with appropriate standards, regulations, and backgound levels provide the basis for concluding that environmental effects from Laboratory operations are insignificant and do not impact the public, Laboratory employees, or the environment. 52 refs., 32 figs., 117 tabs

  8. Environmental surveillance at Los Alamos during 1991

    International Nuclear Information System (INIS)

    Dewart, J.; Kohen, K.L.

    1993-08-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1991. Routine monitoring for radiation and for radioactive and chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1991 cover external penetrating radiation; quantities of airborne emissions and effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are small and do not pose a threat to the public, Laboratory employees, or the environment

  9. Environmental surveillance at Los Alamos during 1992

    International Nuclear Information System (INIS)

    Kohen, K.; Stoker, A.; Stone, G.

    1994-07-01

    This report describes the environmental surveillance program at Los Alamos National Laboratory during 1992. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring results to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1992 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, laboratory employees, or the environment

  10. Environmental surveillance at Los Alamos during 1987

    International Nuclear Information System (INIS)

    1988-05-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1987. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1987 cover: external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are insignificant and do not pose a threat to the public, Laboratory employees, or the environment. 113 refs., 33 figs., 120 tabs

  11. Environmental surveillance at Los Alamos during 1985

    International Nuclear Information System (INIS)

    1986-04-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1985. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of possible undesirable trends. Results and interpretation of data for 1985 cover: external penetrating radiation; chemical and radiochemical quality of ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; quantities of airborne emissions and liquid effluents; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels from natural or other non-Laboratory sources provide the basis for concluding that environmental effects attributable to Laboratory operations are insignificant and are not considered hazardous to the population of the area or Laboratory employees

  12. Environmental surveillance at Los Alamos during 1981

    International Nuclear Information System (INIS)

    1982-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos National Laboratory during 1981. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of data for 1981 are included on penetrating radiation; on the chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soil and sediments, and food; and on the quantities of airborne emissions and liquid effluents. Comparisons with appropriate standards and regulations or with background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are insignificant and are not considered hazardous to the population of the area. Results of several special studies describe some unique environmental conditions in the Laboratory environs

  13. Environmental surveillance at Los Alamos during 1979

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1979. Routine monitoring for radiation and radioactive or chemical substances was conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1979 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs.

  14. Environmental surveillance at Los Alamos during 1989

    International Nuclear Information System (INIS)

    1990-12-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1989. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1989 cover external penetrating radiation; quantities of airborne emissions and effluents; concentrations of chemicals and radionuclides in ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are small and do not pose a threat to the public, Laboratory employees, or the environment. 58 refs., 31 figs., 39 tabs

  15. Environmental surveillance at Los Alamos during 1980

    International Nuclear Information System (INIS)

    1981-04-01

    Documentation is presented for the environmental surveillance program during 1980. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1980 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies describe some unique environmental conditions in the Laboratory environs

  16. Environmental surveillance at Los Alamos during 1995

    International Nuclear Information System (INIS)

    1996-10-01

    This report describes the environmental surveillance program at Los Alamos National Laboratory (LANL or the Laboratory) during 1995. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring result to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1995 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, Laboratory employees, or the environment

  17. Environmental surveillance at Los Alamos during 1979

    International Nuclear Information System (INIS)

    1980-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1979. Routine monitoring for radiation and radioactive or chemical substances was conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1979 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs

  18. Environmental surveillance at Los Alamos during 1990

    International Nuclear Information System (INIS)

    1992-03-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1990. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1990 cover external penetrating radiation; quantities of airborne emissions and effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are small and do not pose a threat to the public, Laboratory employees, or the environment

  19. Environmental surveillance at Los Alamos during 1987

    Energy Technology Data Exchange (ETDEWEB)

    1988-05-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1987. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1987 cover: external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are insignificant and do not pose a threat to the public, Laboratory employees, or the environment. 113 refs., 33 figs., 120 tabs.

  20. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2005-01-19

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This document contains the calendar year 2005 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project.

  1. Data analysis and interpretation for environmental surveillance

    International Nuclear Information System (INIS)

    1992-06-01

    The Data Analysis and Interpretation for Environmental Surveillance Conference was held in Lexington, Kentucky, February 5--7, 1990. The conference was sponsored by what is now the Office of Environmental Compliance and Documentation, Oak Ridge National Laboratory. Participants included technical professionals from all Martin Marietta Energy Systems facilities, Westinghouse Materials Company of Ohio, Pacific Northwest Laboratory, and several technical support contractors. Presentations at the conference ranged the full spectrum of issues that effect the analysis and interpretation of environmental data. Topics included tracking systems for samples and schedules associated with ongoing programs; coalescing data from a variety of sources and pedigrees into integrated data bases; methods for evaluating the quality of environmental data through empirical estimates of parameters such as charge balance, pH, and specific conductance; statistical applications to the interpretation of environmental information; and uses of environmental information in risk and dose assessments. Hearing about and discussing this wide variety of topics provided an opportunity to capture the subtlety of each discipline and to appreciate the continuity that is required among the disciplines in order to perform high-quality environmental information analysis

  2. Westinghouse Hanford Company environmental surveillance annual report

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Johnson, A.R.; McKinney, S.M.; Perkins, C.J.; Webb, C.R.

    1992-07-01

    This document presents the results of near-facility operational environmental monitoring in 1991 of the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State, as performed by Westinghouse Hanford Company. These activities are conducted to assess and to control the impacts of operations on the workers and the local environment and to monitor diffuse sources. Surveillance activities include sampling and analyses of ambient air, surface water, groundwater, sediments, soil, and biota. Also, external radiation measurements and radiological surveys are taken at waste disposal sites, radiologically controlled areas, and roads

  3. Environmental surveillance at Los Alamos during 1984

    International Nuclear Information System (INIS)

    1985-04-01

    This report describes the environmental surveillance program conducted by the Los Alamos National Laboratory during 1984. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of data for 1984 are included on external penetrating radiation; on the chemical and radiochemical quality of ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and on the quantities of airborne emissions and liquid effluents. Comparisons with appropriate standards, regulations, and background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are insignificant and are not considered hazardous to the population of the area or Laboratory employees. 8 refs., 38 figs., 57 tabs

  4. Environmental surveillance at Los Alamos during 1983

    International Nuclear Information System (INIS)

    1984-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos National Laboratory during 1983. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of data for 1983 are included on external penetrating radiation; on the chemical and radiochemical quality of ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and on the quantities of airborne emissions and liquid effluents. Comparisons with appropriate standards, regulations, and background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are insignificant and are not considered hazardous to the population of the area of Laboratory employees. 61 references, 34 figures, 22 tables

  5. Laboratory of environmental radiological surveillance; Laboratorio de vigilancia radiologica ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Mendez G, A.; Marcial M, F.; Giber F, J.; Montiel R, E.; Leon del V, E.; Rivas C, I.; Leon G, M.V.; Lagunas G, E.; Aragon S, R.; Juarez N, A.; Alfaro L, M.M

    1991-12-15

    The department of radiological protection of the ININ requests the collaboration of the Engineering Unit for the elaboration of the work project of the laboratory of environmental radiological surveillance. The emission of radioactive substances to the atmosphere like consequence of the normal operation of the Nuclear Center, constitutes an exhibition source from the man to the radiations that it should be appropriately watched over and controlled to be able to determine the population's potential exhibition that it lives in the area of influence of the installation. (Author)

  6. Laboratory of environmental radiological surveillance; Laboratorio de vigilancia radiologica ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Mendez G, A; Marcial M, F; Giber F, J; Montiel R, E; Leon del V, E; Rivas C, I; Leon G, M V; Lagunas G, E; Aragon S, R; Juarez N, A; Alfaro L, M M

    1991-12-15

    The department of radiological protection of the ININ requests the collaboration of the Engineering Unit for the elaboration of the work project of the laboratory of environmental radiological surveillance. The emission of radioactive substances to the atmosphere like consequence of the normal operation of the Nuclear Center, constitutes an exhibition source from the man to the radiations that it should be appropriately watched over and controlled to be able to determine the population's potential exhibition that it lives in the area of influence of the installation. (Author)

  7. Master schedule for CY-1978. Hanford Environmental Surveillance Routine Program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Myers, D.A.; Fix, J.J.

    1977-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. No results are presented in this report. The data collected are available in routine reports issued by the Environmental Evaluations staff

  8. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  9. Environmental surveillance at Los Alamos during 1991. Environmental protection group

    Energy Technology Data Exchange (ETDEWEB)

    Dewart, J.; Kohen, K.L. [comps.

    1993-08-01

    This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1991. Routine monitoring for radiation and for radioactive and chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1991 cover external penetrating radiation; quantities of airborne emissions and effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are small and do not pose a threat to the public, Laboratory employees, or the environment.

  10. Environmental surveillance at Hanford for CY-1981

    International Nuclear Information System (INIS)

    Sula, M.J.; McCormack, W.D.; Dirkes, R.L.; Price, K.R.; Eddy, P.A.

    1982-05-01

    Environmental surveillance activities performed by the Pacific Northwest Laboratory for 1981 are discussed. The results are summarized as follows: Radionuclide concentrations and radiation dose measurements were below applicable concentration guides and radiation dose standards. There was no difference detected between airborne radionuclide concentrations in samples collected near to and far from the Hanford Site. A difference in 129 I concentration in Columbia River water downstream compared to upstream was observed. Strontium-90 concentrations downstream remained similar to past years while reduced concentrations were observed in the upstream samples. In addition, 60 Co and 131 I were observed more frequently in the downstream river water samples than in the upstream samples. In all cases, the downstream radionuclide concentrations were small in comparison to DOE radionuclide concentration guides and state and EPA drinking water standards. Low concentrations of radionuclides attributed to operations were observed in wildlife collected onsite. Low concentrations of fallout radionuclides from worldwide atmospheric nuclear testing were observed in foodstuffs and in soil and vegetation; there was no indication of a Hanford contribution to radionuclide levels. The highest penetrating dose rates were in the vicinities of the 100N and 300 Areas. Dose rates at both locations resulted from the presence, within the operating areas, of contained radioactive materials. Nonradiological water quality parameters were all within State Water Quality Standards for the Columbia River. The maximum 50-year whole body dose commitment to an individual from effluents released in 1981 was calculated to be 0.4 mrem. The maximum 50-year dose to a single organ, considering all pathways was approximately 1.3 mrem to the bone, primarily due to 90 Sr in the Columbia River

  11. Surveillance of environmental risks for the health in the area of the construction of hydroelectric project Porce ll, Antioquia Colombia 1997 -2000

    International Nuclear Information System (INIS)

    Gonzalez P, Claudia; Rios V Claudia; Osorio Q, Lisardo; Valencia Lia, Marta; Escobar V, Juan Pablo; Lopez A, Yolanda

    2002-01-01

    The effects on the health of the human populations generated by the construction of dams for the energy production, not always have been considered when the construction of the work is planned. Van Thiel (1962), Gartrell et al. (1972), Ackerman et al. (1973), Brown and Deom (1973), Waddy (1973, 1975), Stanley and Alpers (1975), Worthington (1978), Eguniwe (1976) y Paiva (1982). This study pilot in the country watched during four years the environmental conditions of risk for the health in the hydroelectric project Porce ll during its construction and the pertinent measures were recommended, to protect the conditions of health of the population worker and the inhabitants of the area of influence of this one. In periodic form, the work camping, work fronts and medical centers were inspected. The main problem observed through the time was related to the deficient processes of washing and disinfections in the sanitary services and restaurants and the presence of diverse vectors breeding place of diseases, appearing greater problem in the rims in disuse and carps that were used to cover the structures and equipment that was stored outdoors. Most of the factors of risk for the health they were corrected Colombia. Through the time and in so me it was necessary to insist on the given recommendations

  12. Master schedule for CY-1981 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1980-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is provided. Questions about specific entries should be referred to the authors since modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Air quality data obtained in a separate program are also reported. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Schedules are presented for the following subjects: air, Columbia River, sanitary water, surface water, ground water, foodstuffs, wildlife, soil and vegetation, external radiation measurement, portable instrument surveys, and surveillance of waste disposal sites

  13. Master schedule for CY-1980 Hanford Environmental Surveillance Routine Program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1979-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is presented. The enviromental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Data are reported on the following topics: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurement; portable instrument surveys; and surveillance of waste disposal sites;

  14. Environmental surveillance at Los Alamos during 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This report describes environmental monitoring activities at Los Alamos National Laboratory for 1994. Data were collected to assess external penetrating radiation, airborne emissions, liquid effluents, radioactivity of environmental materials and food stuffs, and environmental compliance.

  15. Environmental surveillance at Los Alamos during 1994

    International Nuclear Information System (INIS)

    1996-07-01

    This report describes environmental monitoring activities at Los Alamos National Laboratory for 1994. Data were collected to assess external penetrating radiation, airborne emissions, liquid effluents, radioactivity of environmental materials and food stuffs, and environmental compliance

  16. Environmental Control Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the Environmental Control Project of the 'Centro de Energia Nuclear na Agricultura' (CENA), Piracicaba , Sao Paulo State, Brazil, is described. Such research comprises: determination of ions and metals in waters from different sources; survey of the mineralogical composition of Amazon Basin rivers; development of specific methodologies for the determination of minerals in studies of mineral nutrition of plants and animal nutrition; development of methodologies for the determination of wood sample density, a nuclear method being developed to be applied to field conditions; study of the water flux mouvement within wood. (M.A.) [pt

  17. Surveillance of environmental radiation in Finland. Annual Report 2002

    International Nuclear Information System (INIS)

    Mustonen, R.

    2003-01-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of the levels of radiation to which the public is exposed. Another goal is to detect all remarkable changes in the levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on a continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on both national and EU legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for the surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, the Finnish Meteorological Institute (FMI) and the Defence Forces also monitor environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2002. The report also contains some comparisons with results from the previous years. The results are obtained from the monitoring programmes of STUK, FMI and the Defence Forces Research Institute of Technology. Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. These results are reported elsewhere. STUK's partners in the surveillance of environmental radioactivity collect and deliver environmental samples for laboratory analyses, or participate in whole-body counting. STUK would like to express its gratitude to the following institutions for successful co-operation: The Finnish Defence Forces, the Finnish

  18. Surveillance of environmental radiation in Finland. Annual Report 2001

    International Nuclear Information System (INIS)

    Mustonen, R.

    2002-01-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of levels of radiation to which the public is exposed. Another goal is to detect all remarkable changes in levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of health of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on the national and the European Communities' legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, also the Finnish Meteorological Institute (FMI) and the Defence Forces are monitoring environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2001. The report also contains some comparisons with results from the previous years. The results are collected from monitoring programmes of STUK, FMI and the Defence Forces Research Institute of Technology. Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. Those results are reported elsewhere. STUK's partners in surveillance of environmental radioactivity are collecting and delivering environmental samples for laboratory analyses, or are participating in whole-body counting. STUK would like to express its gratitude to the following institutions for the successful co-operation: Defence

  19. Surveillance of environmental radiation in Finland. Annual Report 2003

    International Nuclear Information System (INIS)

    Mustonen, R.

    2004-01-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of the levels of radiation to which the public is exposed. Another goal is to detect all remarkable changes in the levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on a continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on both national and EU legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for the surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, the Finnish Meteorological Institute (FMI) and the Defence Forces also monitor environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2003. The report also contains some comparisons with results from the previous years. The results are obtained from the monitoring programmes of STUK, FMI and the Defence Forces Research Institute of Technology. Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. These results are reported elsewhere. STUK's partners in the surveillance of environmental radioactivity collect and deliver environmental samples for laboratory analyses, or participate in whole-body counting. STUK would like to express its gratitude to the following institutions for successful co- operation: The Finnish Defence Forces, the Finnish

  20. Standard protocol for conducting pre-operational environmental surveillance around nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hegde, A G; Verma, P C; Rajan, M P [Health Safety and Environment Group, Bhabha Atomic Research Centre, Mumbai (India)

    2009-02-15

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for conducting pre-operational environmental surveillance around nuclear facilities. Such surveillances have been proposed to be carried out by university professionals under DAE-BRNS projects. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  1. Standard protocol for conducting pre-operational environmental surveillance around nuclear facilities

    International Nuclear Information System (INIS)

    Hegde, A.G.; Verma, P.C.; Rajan, M.P.

    2009-02-01

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for conducting pre-operational environmental surveillance around nuclear facilities. Such surveillances have been proposed to be carried out by university professionals under DAE-BRNS projects. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  2. Surveillance of environmental radiation in Finland. Annual Report 2000

    International Nuclear Information System (INIS)

    Mustonen, R.

    2001-01-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of levels of radiation to which the public is exposed. Another goal is to detect all remarkable changes in levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of the health of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on the national and the European Communities' legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, also the Finnish Meteorological Institute (FMI) and the Defence Forces are monitoring environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2000. The report also contains some comparisons with results from the previous years. The results are collected from monitoring programmes of STUK, FMI and the Defence Forces Research Institute of Technology. Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. Those results are reported elsewhere. STUK's partners in surveillance of environmental radioactivity are collecting and delivering samples for laboratory analyses, or are participating in whole-body counting. STUK would like to express its gratitude to the following institutions for the successful co-operation: Defence Forces

  3. Hanford Site Environmental Surveillance Data Report for Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2009-08-11

    Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2008" (PNNL-18427), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

  4. Hanford Site Environmental Surveillance Data Report for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2008-10-13

    Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2007" (PNNL-17603), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

  5. Summary of environmental surveillance at Los Alamos during 1995

    International Nuclear Information System (INIS)

    1996-10-01

    Linking the Rio Grande Valley and the Jemez Mountains, New Mexico's Pajarito Plateau is home to a world-class scientific institution. Los Alamos National Laboratory (or the Laboratory), managed by the Regents of the University of California, is a government-owned, Department of Energy-supervised complex investigating all areas of modern science for the purposes of national defense, health, conservation, and ecology. The Laboratory was founded in 1943 as part of the Manhattan Project, whose members assembled to create the first nuclear weapon. Occupying the campus of the Los Alamos Ranch School, American and British scientists gathered on the isolated mesa tops to harness recently discovered nuclear power with the hope of ending World War II. In July 1945, the initial objective of the Laboratory, a nuclear device, was achieved in Los Alamos and tested in White Sands, New Mexico. Today the Laboratory continues its role in defense, particularly in nuclear weapons, including developing methods for safely handling weapons and managing waste. For the past twenty years, the Laboratory has published an annual environmental report. This pamphlet offers a synopsis that briefly explains important concepts, such as radiation and provides a summary of the monitoring results and regulatory compliance status that are explained at length in the document entitled Environmental Surveillance at Los Alamos during 1995

  6. Surveillance of environmental radiation in Finland. Annual Report 2004

    International Nuclear Information System (INIS)

    Mustonen, R.

    2005-07-01

    The main goal of the surveillance of environmental radioactivity is to be always aware of levels of artificial radiation in the environment to which the public is exposed. Another goal is to detect all remarkable changes in levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of health of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. Surveillance of environmental radiation contains surveillance of artificial radiation and artificial radioactive elements in the environment. Natural radiation and natural radioactive elements are not associated with the surveillance programme, although the greater part of the public exposure to radiation is caused by natural radiation. Exposure to natural radiation is controlled separately if there is reason to suspect that natural radioactive elements cause unusual high exposure to the public (e.g. indoor radon and natural radionuclides in drinking water). Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on the national and the European Communities' legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air, water and soil in the Member States. In Finland, also the Finnish Meteorological Institute (FMI) and the Defence Forces are monitoring environmental radiation at their own stations. This report summarises the results of environmental radiation surveillance in 2004. The report also contains some comparisons with results from the

  7. Environmental surveillance at Hanford for CY-1976

    International Nuclear Information System (INIS)

    Fix, J.J.; Blumer, P.J.; Hoenes, G.R.; Bramson, P.E.

    1977-04-01

    Environmental data collected during 1976 show continued compliance by Hanford with all applicable state and federal regulations. Data were collected for most environmental media including air, Columbia River water, external radiation, foodstuffs (milk, meat, eggs, poultry, and produce), and wildlife (deer, fish, game birds, and oysters from Willapa Bay), as well as a few soil and vegetation samples. The data are summarized

  8. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2011-01-21

    This document contains the calendar year 2011 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2011, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2011.

  9. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  10. Master schedule for CY-1982 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites

  11. Environmental surveillance at Hanford for CY 1977

    International Nuclear Information System (INIS)

    Houston, J.R.; Blumer, P.J.

    1978-04-01

    Environmental data collected during 1977 show continued compliance by Hanford with all applicable state and federal regulations. Data were collected for most environmental media including air, Columbia River water, external radiation, foodstuffs (milk, beef, eggs, poultry, and produce) and wildlife (deer, fish, game birds, and oysters from Willapa Bay), as well as soil and vegetation samples. In general, offsite levels of radionuclides attributable to Hanford operations during 1977 were indistinguishable from background levels

  12. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  13. Quality assurance applied to an environmental surveillance program

    International Nuclear Information System (INIS)

    Oakes, T.W.; Shank, K.E.; Eldridge, J.S.

    1977-01-01

    A discussion of a quality assurance program applied to environmental surveillance activities is presented. This includes the philosophy and concepts of quality assurance, along with a detailed assessment of the sources of uncertainty in a monitoring program. The role management must play for a successful program is also discussed, and the quality assurance program implemented at Oak Ridge National Laboratory is presented

  14. Environmental surveillance at Hanford for CY-1975 data

    International Nuclear Information System (INIS)

    Blumer, P.J.; Fix, J.J.; Speer, D.R.

    1976-04-01

    This document contains detailed data collected by the Hanford Environmental Surveillance program during 1975. Environmental Surveillance responsibilities at Hanford are divided between Hanford Environmental Health Foundation (HEHF) and Battelle-Northwest (BNW). HEHF is responsible for measuring all nonradiological air quality and sanitary water parameters of interest. BNW is responsible for measuring radiological parameters in all environmental media of significance and for measuring both radiological and nonradiological parameters of Columbia River water and ground water. A brief description of the method and location of sample collection during 1975 is included. Data are tabulated on the content of specific radionuclides in surface air. Columbia River water, drinking water, ground water, foods, fish, and wild animals. Data are also included on content of NO 2 and SO 2 in air, nitrates in Columbia River water, ground water, and drinking water, and water quality of samples of Columbia River water collected at various sampling locations

  15. Environmental surveillance at Los Alamos during 1974

    International Nuclear Information System (INIS)

    Apt, K.E.; Lee, V.J.

    1975-05-01

    The CY 1974 environmental monitoring program of the Los Alamos Scientific Laboratory (LASL) is documented. Data are presented for concentrations of radioactivity measured in air, ground, and surface waters, sediments, and soils, and those data are compared with relevant AEC guides and/or data from other reporting periods. Levels of external penetrating radiation measured in the LASL environs are given. The average whole-body radiation dose to residents of Los Alamos County resulting from LASL operations is calculated. Chemical and biological qualities of surface and ground waters of the LASL environs have been determined and are compared to applicable standards. Results of related environmental studies are provided. (U.S.)

  16. Environmental surveillance at Los Alamos during 1975

    International Nuclear Information System (INIS)

    Apt, K.E.; Lee, V.J.

    1976-04-01

    This report documents the CY 1975 environmental monitoring program of the Los Alamos Scientific Laboratory (LASL). Data are presented for concentrations of radioactivity measured in air, ground and surface waters, sediments, soils, and foodstuffs, and are compared with relevant U.S. Energy Research and Development Administration guides and/or data from other reporting periods. Levels of external penetrating radiation measured in the LASL environs are given. The average whole-body radiation dose to residents of Los Alamos County resulting from LASL operations is calculated. Chemical qualities of surface and ground waters in the LASL environs have been determined and compared to applicable standards. Results of related environmental studies are summarized

  17. Environmental surveillance at Los Alamos during 1976

    International Nuclear Information System (INIS)

    1977-04-01

    This report documents the environmental monitoring program at the Los Alamos Scientific Laboratory (LASL) in 1976. Data are presented for concentrations of radioactivity measured in air, ground and surface waters, sediments, soils, and foodstuffs, and are compared with relevant U.S. Energy Research and Development Administration guides and/or data from other reporting periods. Levels of external penetrating radiation measured in the LASL environs are given. The average whole-body radiation dose to residents of Los Alamos County resulting from LASL operations is calculated. Chemical qualities of surface and ground waters in the LASL environs have been determined and compared to applicable standards. Results of related environmental studies are summarized

  18. Hanford Site environmental surveillance data report for calendar year 1995

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1996-07-01

    Environmental surveillance at the Hanford Site collects data that provides a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River Water and Sediment. Pacific Northwest National Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1995 describes the Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. The report includes a summary of offsite and onsite environmental monitoring data collected during 1995 by PNNL's Environmental Monitoring Program. Appendix A of that report contains data summaries created from raw surface, river monitoring data, and chemical air data. This volume contains the actual raw data used to create the summaries. The data volume also includes Hanford Site drinking water radiological data

  19. Quality-control activities of the Hanford Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Price, K.R.; Jaquish, R.E.

    1982-01-01

    A comprehensive approach to quality control (QC) has been developed by the Pacific Northwest Laboratory for the Hanford Environmental Surveillance Program. The framework of quality control for the surveillance program has been documented in a QC implementation guide wherein QC requirements are specified and specific responsibilities and authorities are described. Subjects in the guide include the collection, analysis, and reporting of samples as well as equipment calibration and maintenance, training, audits, and record keeping. A QC file and library have been established to store pertinent documentation, records, and references for ready access

  20. Environmental surveillance at Hanford for CY-1979

    International Nuclear Information System (INIS)

    Houston, J.R.; Blumer, P.J.

    1980-04-01

    Environmental data were collected for most environmental media including air, Columbia River water, external radiation, foodstuffs (milk, beef, eggs, poultry, and produce) and wildlife (deer, fish, and game birds), as well as soil and vegetation samples. In general, offsite levels of radionuclides attributable to Hanford operations during 1979 were indistinguishable from background levels. The data are summarized in the following highlights. Air quality measurements of NO 2 in the vicinity of the Hanford Site and releases of SO 2 onsite were well within the applicable federal and state standards. Particulate air concentrations exceed the standards primarily because of agricultural activities in the area. Discharges of waste water from Hanford facilities in the Columbia River under the National Pollution Discharge Elimination System (NPDES) permit were all within the parameter limits on the permit

  1. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  2. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  3. Guide for environmental radiological surveillance at ERDA installations

    International Nuclear Information System (INIS)

    Corley, J.P.; Denham, D.H.; Michels, D.E.; Olsen, A.R.; Waite, D.A.

    1977-03-01

    This Guide is intended to: Provide recommended methods, procedures, and performance criteria to bring greater comparability to ERDA environmental monitoring and reporting systems; provide ERDA management, particularly the Headquarters' Division of Safety, Standards, and Compliance (SSC) and field offices, with a broad review of accepted radiological surveillance practices for use in the evaluation of environmental surveillance programs at ERDA facilities; and delineate the capabilities and limitations of the various environmental monitoring systems for radioactivity currently used at ERDA sites, including technical areas where there is either an inadequate basis for procedural selection or where further developmental work may be warranted. The discussion of equipment, measurement techniques, and quality control procedures, although believed to represent current technology, is subject to continuing change as technological improvements become available

  4. Environmental surveillance at Los Alamos during 1983

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    Data from monitoring and sampling at on-site locations to 80 Km from the Laboratory are presented. Included are measurements of radiation and collection of samples of air, particulates, water, soils, sediments and foodstuffs. During 1983 more than 18,000 analyses for chemical and radiochemical constituents were performed on these environmental samples. Calculated individual whole-body radiation doses to the public attributed to Laboratory operations were compared with applicable Radiation Protection Standards and estimates of the added risk of cancer are given. 3 figures, 3 tables

  5. Environmentally Responsible Aviation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Created in 2009 as part of NASA's Aeronautics Research Mission Directorate's Integrated Systems Research Program, the Environmentally Responsible Aviation...

  6. Environmental surveillance for polioviruses in the Global Polio Eradication Initiative.

    Science.gov (United States)

    Asghar, Humayun; Diop, Ousmane M; Weldegebriel, Goitom; Malik, Farzana; Shetty, Sushmitha; El Bassioni, Laila; Akande, Adefunke O; Al Maamoun, Eman; Zaidi, Sohail; Adeniji, Adekunle J; Burns, Cara C; Deshpande, Jagadish; Oberste, M Steve; Lowther, Sara A

    2014-11-01

    This article summarizes the status of environmental surveillance (ES) used by the Global Polio Eradication Initiative, provides the rationale for ES, gives examples of ES methods and findings, and summarizes how these data are used to achieve poliovirus eradication. ES complements clinical acute flaccid paralysis (AFP) surveillance for possible polio cases. ES detects poliovirus circulation in environmental sewage and is used to monitor transmission in communities. If detected, the genetic sequences of polioviruses isolated from ES are compared with those of isolates from clinical cases to evaluate the relationships among viruses. To evaluate poliovirus transmission, ES programs must be developed in a manner that is sensitive, with sufficiently frequent sampling, appropriate isolation methods, and specifically targeted sampling sites in locations at highest risk for poliovirus transmission. After poliovirus ceased to be detected in human cases, ES documented the absence of endemic WPV transmission and detected imported WPV. ES provides valuable information, particularly in high-density populations where AFP surveillance is of poor quality, persistent virus circulation is suspected, or frequent virus reintroduction is perceived. Given the benefits of ES, GPEI plans to continue and expand ES as part of its strategic plan and as a supplement to AFP surveillance. Published by Oxford University Press on behalf of the Infectious Diseases Society of America 2014. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  7. Environmental Surveillance System To Track Wild Poliovirus Transmission

    Science.gov (United States)

    Deshpande, Jagadish M.; Shetty, Sushmitha J.; Siddiqui, Zaeem A.

    2003-01-01

    Eradication of poliomyelitis from large metropolis cities in India has been difficult due to high population density and the presence of large urban slums. Three paralytic poliomyelitis cases were reported in Mumbai, India, in 1999 and 2000 in spite of high immunization coverage and good-quality supplementary immunization activities. We therefore established a systematic environmental surveillance study by weekly screening of sewage samples from three high-risk slum areas to detect the silent transmission of wild poliovirus. In 2001, from among the 137 sewage samples tested, wild poliovirus type 1 was isolated from 35 and wild poliovirus type 3 was isolated from 1. Acute flaccid paralysis (AFP) surveillance indicated one case of paralytic poliomyelitis from the city. Phylogenetic analysis with complete VP1 sequences revealed that the isolates from environmental samples belonged to four lineages of wild polioviruses recently isolated from poliomyelitis cases in Uttar Pradesh and not to those previously isolated from AFP cases in Mumbai. Wild poliovirus thus introduced caused one case of paralytic poliomyelitis. The virus was detected in environmental samples 3 months before. It was found that wild polioviruses introduced several times during the year circulated in Mumbai for a limited period before being eliminated. Environmental surveillance was found to be sensitive for the detection of wild poliovirus silent transmission. Nucleotide sequence analysis helped identify wild poliovirus reservoir areas. PMID:12732567

  8. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2008-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, "Environmental Protection Program," and DOE Order 5400.5, "Radiation Protection of the Public and the Environment." The environmental surveillance sampling design is described in the "Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office." This document contains the calendar year 2008 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2008, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2008.

  9. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2010-01-08

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford Site environs per regulatory requirements. This document contains the calendar year 2010 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2010, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2010.

  10. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2009-01-20

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1 and DOE Order 5400.5. This document contains the calendar year 2009 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2009, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2009.

  11. Environmental surveillance at Hanford for CY-1974

    International Nuclear Information System (INIS)

    Fix, J.J.

    1975-04-01

    During 1974, the work at Hanford included N Reactor operation, nuclear fuel fabrication, liquid waste solidification, continued construction of the Fast Flux Test Facility, continued construction of Washington Public Power Supply System (WPPSS) No. 2 power reactor, Arid Lands Ecology studies, as well as continued use of a variety of research and laboratory facilities. Environmental data collected during 1974 showed continued compliance of Hanford operations with all applicable state and federal regulations. Levels of radioactivity in the atmosphere from Hanford operations at all offsite sampling locations were indistinguishable from levels due to natural causes and fallout from nuclear detonations in the atmosphere. Air quality measurements of NO 2 in the Hanford environs recorded a maximum yearly average concentration of 0.006 ppM or 12 percent of the ambient air standard. There was no indication that Hanford operations contributed significantly to these levels. All SO 2 results were less than the detection limit of 0.005 ppM or 25 percent of the ambient air quality standard. Routine radiological, chemical, biological, and physical analyses of Columbia River water upstream and downstream of the Hanford Reservation operations with the possible exception of water temperature. Levels of radioactivity were similar at both locations and were due to natural and fallout radioactivity. Estimates are included of the radiation dose to the human population within an 80-kilometer (50-mile) radius of the site during 1974. Methods used in calculations of the annual dose and 50-year dose commitment from radioactive effluents are discussed. (U.S.)

  12. Nuclear power stations: environmental surveillance of radioactivity

    International Nuclear Information System (INIS)

    Pellerin, P.

    1972-01-01

    Because of the radiations they emit, radioactive substances can be detected, identified and measured at extremely low concentrations ? the corresponding masses are lower by a factor ranging from 1000 to 10 000 than those that can be measured by any other chemical or physical method, however precise, applied to non-radioactive substances. Radioisotopes can therefore be detected in the environment at levels much lower than those at which genuine public health problems begin to arise. Unfortunately, we cannot say the same of numerous non-radio active pollutants, which can be measured only at concentrations very close to, or even exceeding, the toxicity threshold. In the mind of the uninformed public confusion seems quite frequently to reign as between the detection threshold and the toxicity threshold. This undoubtedly explains the following situation which is, to say the least, paradoxical: people are afraid of the hypothetical effects of radioactivity at ridiculously low levels, whereas nobody is alarmed at the fact that the toxicity limits for a very large number of non-radioactive, but very real pollutants are being exceeded almost continuously. The sum of all artificial irradiations does not exceed the normal fluctuations of natural irradiation, and if the genetic effects of very low radiation doses were truly cumulative, the natural radiation to which we are all exposed and which is by far the highest would by itself have eliminated every trace of life on earth long ago. Lastly, let us not forget that merely the use of X-rays in medicine, particularly in radiodiagnosis, represents an additional average artificial irradiation of the population amounting to double the natural radiation (100 millirem per year). This is about 100 times the irradiation which would accrue from nuclear industry even according to the most pessimistic estimate. We have seen that the measures described above will make it genuinely possible to maintain environmental radioactivity in all

  13. Environmental surveillance at Hanford for CY-1974 data

    International Nuclear Information System (INIS)

    Fix, J.J.; Blumer, P.J.

    1975-04-01

    Data collected by the Hanford Environmental Surveillance program during 1974 are presented in tables. Data are included on radiological parameters measured in the atmosphere, Columbia River water, drinking water; radionuclides in soil and vegetation, fish and wildlife, and selected foodstuffs; measurements of external radiation doses; and nonradiological parameters measured in the atmosphere, drinking water, and Columbia River water. Methods of sample collection are described briefly. (U.S.)

  14. Statistical distributions as applied to environmental surveillance data

    International Nuclear Information System (INIS)

    Speer, D.R.; Waite, D.A.

    1975-09-01

    Application of normal, log normal, and Weibull distributions to environmental surveillance data was investigated for approximately 300 nuclide-medium-year-location combinations. Corresponding W test calculations were made to determine the probability of a particular data set falling within the distribution of interest. Conclusions are drawn as to the fit of any data group to the various distributions. The significance of fitting statistical distributions to the data is discussed

  15. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  16. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed

  17. Hanford Site environmental surveillance data report for calendar year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1996-07-01

    Environmental surveillance at the Hanford Site collects data that provides a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River Water and Sediment. Pacific Northwest National Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1995 describes the Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. The report includes a summary of offsite and onsite environmental monitoring data collected during 1995 by PNNL`s Environmental Monitoring Program. Appendix A of that report contains data summaries created from raw surface, river monitoring data, and chemical air data. This volume contains the actual raw data used to create the summaries. The data volume also includes Hanford Site drinking water radiological data.

  18. Compact and maintenance-free radio probes for environmental surveillance of the gamma dose rate

    International Nuclear Information System (INIS)

    Genrich, V.

    1998-01-01

    The author reports on his experience with the operation of radio data networks for the continuous observation of the gamma dose rate in nuclear installations. Practically at every location (within) the installation the hermetically sealed probes can record the measurement values. Moreover, the probes have proved successful in environmental surveillance where they typically work in the form of measurement rings in 10 to 30 km distance. All measurement data are organized in the form of a data base. They can be disposed of in the form of an SQL-server in the computer network (LAN) of the power plant or the institution in charge of environmental surveillance. In comparison to conventional, e.g. cable-bound measurement networks with the new radio transmission technology there are numerous advantages: - minimal cost for projection - minimal cost for installation due to simple fixing - quasi-mobile use with highest possible flexibility - maintenance-free operation and high degree of operating reliability. (orig.) [de

  19. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  20. Monitoring activities review of the Radiological Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Ritter, P.D.

    1992-03-01

    The 1992 Monitoring Activities Review (MAR) is directed at the Radiological Environment Surveillance Program (RESP) activities at the Radioactive Waste Management Complex (RWMC) of Idaho Engineering Laboratory (INEL). MAR panelists studied RESP documents and discussed their concerns with Environmental Monitoring Unit (EMU) staff and other panel members. These concerns were subsequently consolidated into a collection of recommendations with supporting discussions. Recommendations focus on specific monitoring activities, as well as the overall program. The MAR report also contains pertinent comments that should not require further action

  1. Regulatory standards applicable or relevant to the independent Hanford environmental surveillance and oversight program

    International Nuclear Information System (INIS)

    King, S.E.; Hendrickson, P.L.; Siegel, M.R.; Woodruff, M.G.; Belfiglio, J.; Elliott, R.W.

    1990-03-01

    The authors reviewed federal and state statutes and regulations, as well as Department of Energy (DOE) orders and other guidance material, for potential applicability to the environmental surveillance program conducted for the Hanford site by the Pacific Northwest Laboratory (PNL). There are no federal or state statutes or regulations which are directly applicable to the environmental surveillance program. However, other regulatory schemes, while not directly applicable to the environmental surveillance program, are important insofar as they are indicative of regulatory concern and direction. Because of the evolving nature of environmental regulations, this area needs to be closely monitored for future impact on environmental surveillance activities. 9 refs.,

  2. Environmental surveillance program. Quarterly progress report, July--September, 1993

    International Nuclear Information System (INIS)

    Walker, D.W.; Hall, L.F.; Downs, J.

    1996-01-01

    This report contains data developed from monitoring site measurements and laboratory analyses of environmental samples that were collected during the period of July-September, 1993. Because some laboratory procedures are lengthy and could adversely affect the desired timeliness of reports, results of some analyses from this time period will be included in the next quarterly report. Quarterly reports, then, will be routine periodic documents that present continually updated information concerning the potential presence of environmental contaminants in the vicinity of the Idaho National Engineering Laboratory (INEL). During the third calendar quarter of 1993, Environmental Surveillance Program (ESP) measurements did not reveal unexpected levels of contaminants in any environmental samples measured or analyzed. Most of the results reported in this document are related to off-site air and ground water measurements. Future reports will include results of monitoring at additional locations and for additional environmental materials. Annual reports from the ESP will contain data generated during the previous four calendar quarters, and will display measurement trends for various combinations of locations, contaminants and environmental media. The annual report will also include more interpretive material and discussions than will normally be found in quarterly reports

  3. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  4. 10 Steps to Building an Architecture for Space Surveillance Projects

    Science.gov (United States)

    Gyorko, E.; Barnhart, E.; Gans, H.

    Space surveillance is an increasingly complex task, requiring the coordination of a multitude of organizations and systems, while dealing with competing capabilities, proprietary processes, differing standards, and compliance issues. In order to fully understand space surveillance operations, analysts and engineers need to analyze and break down their operations and systems using what are essentially enterprise architecture processes and techniques. These techniques can be daunting to the first- time architect. This paper provides a summary of simplified steps to analyze a space surveillance system at the enterprise level in order to determine capabilities, services, and systems. These steps form the core of an initial Model-Based Architecting process. For new systems, a well defined, or well architected, space surveillance enterprise leads to an easier transition from model-based architecture to model-based design and provides a greater likelihood that requirements are fulfilled the first time. Both new and existing systems benefit from being easier to manage, and can be sustained more easily using portfolio management techniques, based around capabilities documented in the model repository. The resulting enterprise model helps an architect avoid 1) costly, faulty portfolio decisions; 2) wasteful technology refresh efforts; 3) upgrade and transition nightmares; and 4) non-compliance with DoDAF directives. The Model-Based Architecting steps are based on a process that Harris Corporation has developed from practical experience architecting space surveillance systems and ground systems. Examples are drawn from current work on documenting space situational awareness enterprises. The process is centered on DoDAF 2 and its corresponding meta-model so that terminology is standardized and communicable across any disciplines that know DoDAF architecting, including acquisition, engineering and sustainment disciplines. Each step provides a guideline for the type of data to

  5. The role of supplementary environmental surveillance to complement acute flaccid paralysis surveillance for wild poliovirus in Pakistan - 2011-2013.

    Directory of Open Access Journals (Sweden)

    Tori L Cowger

    Full Text Available More than 99% of poliovirus infections are non-paralytic and therefore, not detected by acute flaccid paralysis (AFP surveillance. Environmental surveillance (ES can detect circulating polioviruses from sewage without relying on clinical presentation. With extensive ES and continued circulation of polioviruses, Pakistan presents a unique opportunity to quantify the impact of ES as a supplement to AFP surveillance on overall completeness and timeliness of poliovirus detection.Genetic, geographic and temporal data were obtained for all wild poliovirus (WPV isolates detected in Pakistan from January 2011 through December 2013. We used viral genetics to assess gaps in AFP surveillance and ES as measured by detection of 'orphan viruses' (≥1.5% different in VP1 capsid nucleotide sequence. We compared preceding detection of closely related circulating isolates (≥99% identity detected by AFP surveillance or ES to determine which surveillance system first detected circulation before the presentation of each polio case.A total of 1,127 WPV isolates were detected by AFP surveillance and ES in Pakistan from 2011-2013. AFP surveillance and ES combined exhibited fewer gaps (i.e., % orphan viruses in detection than AFP surveillance alone (3.3% vs. 7.7%, respectively. ES detected circulation before AFP surveillance in nearly 60% of polio cases (200 of 346. For polio cases reported from provinces conducting ES, ES detected circulation nearly four months sooner on average (117.6 days than did AFP surveillance.Our findings suggest ES in Pakistan is providing earlier, more sensitive detection of wild polioviruses than AFP surveillance alone. Overall, targeted ES through strategic selection of sites has important implications in the eradication endgame strategy.

  6. Environmental radioactivity surveillance programme: results for UK for 1983

    International Nuclear Information System (INIS)

    Smith, D.M.; McAllister, G.; Welham, D.; Orr, D.

    1984-11-01

    The fourth report of a series giving the results of the NRPB's environmental radioactivity surveillance programme is presented. Samples of airborne dust, rainwater and milk are collected routinely throughout the UK; the concentrations of various radionuclides are measured and the resulting exposure of the population is evaluated. The radionuclides detected result predominantly from nuclear weapons testing in the atmosphere, although the programme would also be sensitive to other sources of environmental contamination. The annual average concentrations and depositions of radionuclides from fallout are now at the lowest levels since the inception of the Board's monitoring programme. The average annual effective dose equivalent from fallout is evaluated and compared with that from natural background radiation. (author)

  7. Environmental hardening of robots for nuclear maintenance and surveillance tasks

    International Nuclear Information System (INIS)

    Hintenlang, D.E.; Tulenko, J.S.; Wheeler, R.; Roy, T.

    1990-01-01

    The University of Florida, in cooperation with the Universities of Texas, Tennessee, and Michigan and Oak Ridge National Laboratory, is developing an advanced robotic system for the US Department of Energy under the University Program for Robotics for Advanced Reactors. As part of this program, the University of Florida has been pursuing the development of environmentally hardened components so that autonomous robotic systems can successfully carry out their tasks under the most extreme expected environmental conditions. This requirement means that the designed robotic system with its onboard computer-based intelligence must be able to successfully complete tasks in toxic, radioactive, wet, temperature extremes, and other physically impairing environments. As part of this program, a study was carried out to determine the environmental conditions that should be set as the design criteria for robotic systems to maintain reasonable operations for nuclear plants in the course of maintenance, testing, and surveillance under all conditions, including plant upset. It was decided that Florida would build a combined environmental testing facility to test specific devices in high-radiation/high-temperature combined environments. This environmental test chamber has been built and successfully tested to over 250 degree F. This facility will provide some of the first combined temperatures/radiation data for many large-scale integrated components

  8. Surveillance of poliomyelitis in Northern Italy: Results of acute flaccid paralysis surveillance and environmental surveillance, 2012-2015.

    Science.gov (United States)

    Pellegrinelli, Laura; Bubba, Laura; Primache, Valeria; Pariani, Elena; Battistone, Andrea; Delogu, Roberto; Fiore, Stefano; Binda, Sandro

    2017-02-01

    Although in the last years poliovirus (PV) transmission has been reported at the lowest levels ever recorded, the spread of virus from endemic countries endures; the high levels of immigration flows across the Mediterranean Sea jeopardize Italy for PV reintroduction. The World Health Organization (WHO) strategic plan for global poliomyelitis (polio) eradication indicates the nationwide surveillance of Acute Flaccid Paralysis (AFP) as the gold standard for detecting cases of polio. In addition, the Environmental Surveillance (ES), seeking the presence of PV and Non-Polio Enterovirus (NPEV) in sewage, is recognized as a powerful tool to confirm PV circulation in absence of AFP cases, especially in polio-free countries. Here we report the results of AFP surveillance (AFPS) and ES in Lombardy (Northern Italy) from 2012 to 2015. Forty-eight AFP cases were identified during the study period. No AFP case was caused by PV infection. NPEVs were identified in 6.3% (3/48) of AFP cases. The annual AFP incidence rate was 0.87/100'000 children <15 y in 2012, 1.42/100'000 in 2013, 1.02/100'000 in 2014, and 0.47/100'000 in 2015; according to WHO indicators, the sensitivity of AFPS was adequate in 2013 and 2014. Completeness of case investigation raised progressively during the study period to achieve the WHO standards in 2014 (92.3%) and 2015 (100%). Completeness of follow-up increased from 72.7% in 2012 to 100% in 2014. In the framework of the ES conducted in Milan, 268 wastewater samples were collected from 2012 to 2015 and no PVs were isolated. In contrast, NPEVs were detected in 65.3% (175/268) of samples. All NPEVs characterized belonged to enterovirus species B: echovirus type 11, 6 and 3 were the most frequently detected viruses, representing 29.1% (41/141), 20.6% (29/141) and 9.2% (13/141) of genotyped NPEVs, respectively. Keeping strong and encouraging both AFPS and ES is crucial to ensure that PV will not return unnoticed in Italy - as well as in other polio

  9. SRS environmental air surveillance program 1954-2015: General trends

    Energy Technology Data Exchange (ETDEWEB)

    Abbott, K. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Jannik, T. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-06-02

    The radiological monitoring program at SRS was established under the DuPont Company in June 1951 and was used as a measurement of the effectiveness of plant controls and as an authoritative record of environmental conditions surrounding the plant. It also served as a method of demonstrating compliance with applicable federal regulations and guidance. This document serves as a general summary of changes made specifically to the environmental air monitoring program since its inception, and a discussion of the general trends seen in the air monitoring program at SRS from 1954 to 2015. Initially, the environmental air surveillance program focused not only on releases from SRS but also on fallout from various weapons testing performed through the end of 1978. Flypaper was used to measure the amount of fallout in the atmosphere during this period, and was present at each of the 10 monitoring stations. By 1959, all site stacks were included in the air monitoring program to determine their contribution to the airborne radioactivity onsite, and the number of air surveillance samplers rose to 18. This trend of an increased number of sampling locations continued to a peak of 35 sampling locations before shifting to a downward trend in the mid-1990s. In 1962, 4 outer-range samplers were placed in Savannah and Macon, GA, and in Greenville and Columbia, SC. Until 1976, air samplers were simply placed around the perimeter of the various operation locations (after 1959, this included stacks to determine their contribution to the airborne radioactivity), with the intent of creating as representative a distribution as possible of the air surrounding operations.

  10. N-CDAD in Canada: Results of the Canadian Nosocomial Infection Surveillance Program 1997 N-CDAD Prevalence Surveillance Project

    Directory of Open Access Journals (Sweden)

    Meaghen Hyland

    2001-01-01

    Full Text Available BACKGROUND: A 1996 preproject survey among Canadian Hospital Epidemiology Committee (CHEC sites revealed variations in the prevention, detection, management and surveillance of Clostridium difficile-associated diarrhea (CDAD. Facilities wanted to establish national rates of nosocomially acquired CDAD (N-CDAD to understand the impact of control or prevention measures, and the burden of N-CDAD on health care resources. The CHEC, in collaboration with the Laboratory Centre for Disease Control (Health Canada and under the Canadian Nosocomial Infection Surveillance Program, undertook a prevalence surveillance project among selected hospitals throughout Canada.

  11. Environmental surveillance data report for the first quarter of 1986

    International Nuclear Information System (INIS)

    1986-07-01

    The Department of Environmental Management (DEM) within the Environmental and Occupational Safety Division (E and OS) at the Oak Ridge National Laboratory (ORNL) is responsible for environmental surveillance to: (1) assure compliance with all Federal, State, and local standards for the prevention, control, and abatement of environmental pollution, (2) monitor the adequacy of containment and effluent controls, and (3) assess impacts on the environment of releases from ORNL facilities. During 1986, the Low-Level Counting Facility at ORNL began reporting radionuclide measurements in a manner different from that of previous years. Prior to 1986, data below the minimum detectable limit were reported as ''less than (<)'' the detection limit. This year, results that are negative (samples less than instrument background) are reported. If these data are compared to previous years, it will appear that average values for 1986 have decreased. Apparent decreases may be attributed to the reporting of negative values and the subsequent averaging of this data. Nonradionuclide results that are below the analytical detection limit are expressed as less than (<) the limit. In computing average values, sample results below the limit are assigned the limit, and the resulting average value is expressed as less than the computed value. The Four-Plant Analytical Committee is reviewing the standardization of reporting of less than detectable values. Their recommendations will be incorporated in these reports as they become policy

  12. Neural nets for the plausibility check of measured values in the integrated measurement and information system for the surveillance of environmental radioactivity (IMIS)

    International Nuclear Information System (INIS)

    Haase, G.

    2003-01-01

    Neural nets to the plausibility check of measured values in the ''integrated measurement and information system for the surveillance of environmental radioactivity, IMIS'' is a research project supported by the Federal Minister for the Environment, Nature Conservation and Nuclear Safety. A goal of this project was the automatic recognition of implausible measured values in the data base ORACLE, which measured values from surveillance of environmental radioactivity of most diverse environmental media contained. The conversion of this project [ 1 ] was realized by institut of logic, complexity and deduction systems of the university Karlsruhe under the direction of Professor Dr. Menzel, Dr. Martin Riedmueller and Martin Lauer. (orig.)

  13. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  14. Statistical distributions as applied to environmental surveillance data

    International Nuclear Information System (INIS)

    Speer, D.R.; Waite, D.A.

    1976-01-01

    Application of normal, lognormal, and Weibull distributions to radiological environmental surveillance data was investigated for approximately 300 nuclide-medium-year-location combinations. The fit of data to distributions was compared through probability plotting (special graph paper provides a visual check) and W test calculations. Results show that 25% of the data fit the normal distribution, 50% fit the lognormal, and 90% fit the Weibull.Demonstration of how to plot each distribution shows that normal and lognormal distributions are comparatively easy to use while Weibull distribution is complicated and difficult to use. Although current practice is to use normal distribution statistics, normal fit the least number of data groups considered in this study

  15. Environmental Surveillance of Human Parechoviruses in Sewage in the Netherlands

    Science.gov (United States)

    Wuite, M.; de Roda Husman, A. M.; Rutjes, S. A.

    2013-01-01

    The circulation of human parechoviruses (HPeVs) in the population was studied by environmental surveillance comprising of molecular analyses of sewage samples (n = 89) that were collected from 15 different locations in the Netherlands. Samples were taken from sewage originating from schools (n = 9) or from parts of municipalities (n = 6) during the Dutch school year 2010-2011. At 13/15 locations HPeV1, HPeV3, or HPeV6 RNA was detected at least once; however, sequence diversity did not reflect associations in time or place. A higher percentage of positives was observed in the samples originating from the municipalities. It was demonstrated that HPeV circulated in the studied population to a higher extent than would be expected from the current knowledge on infections predominating in young children. PMID:23934500

  16. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  17. Environmental Public Health Surveillance for Exposure to Respiratory Health Hazards: A Joint NASA/CDC Project to Use Remote Sensing Data for Estimating Airborne Particulate Matter Over the Atlanta, Georgia Metropolitan Area

    Science.gov (United States)

    Quattrochi, Dale A.; Al-Hamdan, Mohammad; Estes, Maurice; Crosson, William

    2007-01-01

    As part of the National Environmental Public Health Tracking Network (EPHTN) the National Center for Environmental Health (NCEH) at the Centers for Disease Control and Prevention (CDC) is leading a project called Health and Environment Linked for Information Exchange (HELiX-Atlanta). The goal of developing the National Environmental Public Health Tracking Network is to improve the health of communities. Currently, few systems exist at the state or national level to concurrently track many of the exposures and health effects that might be associated with environmental hazards. An additional challenge is estimating exposure to environmental hazards such as particulate matter whose aerodynamic diameter is less than or equal to 2.5 micrometers (PM2.5). HELIX-Atlanta's goal is to examine the feasibility of building an integrated electronic health and environmental data network in five counties of Metropolitan Atlanta, GA. NASA Marshall Space Flight Center (NASA/MSFC) is collaborating with CDC to combine NASA earth science satellite observations related to air quality and environmental monitoring data to model surface estimates of PM2.5 concentrations that can be linked with clinic visits for asthma. While use of the Air Quality System (AQS) PM2.5 data alone could meet HELIX-Atlanta specifications, there are only five AQS sites in the Atlanta area, thus the spatial coverage is not ideal. We are using NASA Moderate Resolution Imaging Spectroradiometer (MODIS) satellite Aerosol Optical Depth (AOD) data for estimating daily ground level PM2.5 at 10 km resolution over the metropolitan Atlanta area supplementing the AQS ground observations and filling their spatial and temporal gaps.

  18. Surveillance

    DEFF Research Database (Denmark)

    Albrechtslund, Anders; Coeckelbergh, Mark; Matzner, Tobias

    Studying surveillance involves raising questions about the very nature of concepts such as information, technology, identity, space and power. Besides the maybe all too obvious ethical issues often discussed with regard to surveillance, there are several other angles and approaches that we should...... like to encourage. Therefore, our panel will focus on the philosophical, yet non-ethical issues of surveillance in order to stimulate an intense debate with the audience on the ethical implications of our enquiries. We also hope to provide a broader and deeper understanding of surveillance....

  19. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  20. Surveillance of environmental radiation in Finland. Annual report 2011; Ympaeristoen saeteilyvalvonta Suomessa. Vuosiraportti 2011

    Energy Technology Data Exchange (ETDEWEB)

    Mustonen, R. (ed.)

    2012-08-15

    The main goal of the surveillance of environmental radioactivity is to be always aware of levels of artificial radiation in the environment to which the public is exposed. Another goal is to detect all remarkable changes in levels of environmental radiation and radioactivity. Compliance with the basic safety standards laid down for protection of health of the general public against dangers arising from ionising radiation can be ensured with environmental radiation surveillance. Running of surveillance programmes on continuous basis also maintains and develops competence and readiness to respond to radiological emergencies. This report summarises the results of environmental radiation surveillance in 2011. The report also contains some comparisons with results from the previous years. Surveillance of environmental radiation contains surveillance of artificial radiation and artificial radioactive elements in the environment. Natural radiation and natural radioactive elements are not associated with the surveillance programme, although the greater part of the public exposure to radiation is caused by natural radiation. Exposure to natural radiation is controlled separately if there is reason to suspect, that natural radioactive elements cause unusual high exposure to the public (e.g. indoor radon and natural radionuclides in drinking water). Nuclear power plant licensees are responsible for environmental surveillance in the vicinity of nuclear power plants in Finland. Those results are reported elsewhere. Surveillance of environmental radioactivity in Finland is one of the official obligations of the Radiation and Nuclear Safety Authority (STUK). This obligation is based on the national and the European Communities' legislation. The Finnish radiation protection legislation appoints STUK as the national authority responsible for surveillance of environmental radioactivity, and the Euratom Treaty assumes continuous monitoring of levels of radioactivity in the air

  1. An overview of environmental surveillance of waste management activities at the Idaho National Engineering Laboratory

    Science.gov (United States)

    Smith, T.H.; Chew, E.W.; Hedahl, T.G.; Mann, L.J.; Pointer, T.F.; Wiersma, G.B.

    1986-01-01

    The Idaho National Engineering Laboratory (INEL), in southeastern Idaho, is a principal center for nuclear energy development for the Department of Energy (DOE) and the U.S. Nuclear Navy. Fifty-two reactors have been built at the INEL, with 15 still operable. Extensive environmental surveillance is conducted at the INEL by DOE's Radiological Environmental Sciences Laboratory (RESL), and the U.S. Geological Survey (USGS), the National Oceanic and Atmospheric Administration (NOAA), EG&G Idaho, Inc., and Westinghouse Idaho Nuclear Company (WINCO). Surveillance of waste management facilities radiation is integrated with the overall INEL Site surveillance program. Air, warer, soil, biota, and environmental radiation are monitored or sampled routinely at INEL. Results to date indicate very small or no impacts from INEL on the surrounding environment. Environmental surveillance activities are currently underway to address key environmental issues at the INEL.

  2. Overview of environmental surveillance of waste management activities at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Smith, T.H.; Hedahl, T.G.; Wiersma, G.B.; Chew, E.W.; Mann, L.J.; Pointer, T.F.

    1986-02-01

    The Idaho National Engineering Laboratory (INEL), in southeastern Idaho, is a principal center for nuclear energy development for the Department of Energy (DOE) and the US Nuclear Navy. Fifty-two reactors have been built at the INEL, with 15 still operable. Extensive environmental surveillance is conducted at the INEL by DOE's Radiological and Environmental Sciences Laboratory (RESL), the US Geological Survey (USGS), the National Oceanic and Atmospheric Administration (NOAA), EG and G Idaho, Inc., and Westinghouse Idaho Nuclear Company (WINCO). Surveillance of waste management facilities is integrated with the overall INEL Site surveillance program. Air, water, soil, biota, and environmental radiation are monitored or sampled routinely at the INEL. Results to date indicate very small or no impacts from the INEL on the surrounding environment. Environmental surveillance activities are currently underway to address key environmental issues at the INEL. 7 refs., 6 figs., 2 tabs

  3. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  4. Healthcare associated infections in neonatal intensive care unit and its correlation with environmental surveillance

    Directory of Open Access Journals (Sweden)

    Sanjay Kumar

    2018-03-01

    Full Text Available Healthcare-associated infections (HAI are frequent complications in neonatal intensive care units (NICU with varying risk factors and bacteriological profile. There is paucity of literature comparing the bacteriological profile of organisms causing HAI with the environmental surveillance isolates. Therefore, this study aimed to evaluate demographic profile, risk factors and outcome of HAI in NICU and correlate with environmental surveillance.Three hundred newborns with signs and symptoms of sepsis were enrolled in the study group and their profile, risk factors and outcome were compared with the control group. Univariate analysis and multivariable logistic regression were performed. Environmental surveillance results were compared to the bacteriological profile of HAIs.We identified lower gestational age, male gender and apgar score less than 7 at 5 min, use of peripheral vascular catheter & ventilator along with their duration as significant risk factors. Mortality rate was 29% in the study group (p < 0.05. The HAI site distribution showed blood-stream infections (73% to be the most common followed by pneumonia (12% and meningitis (10%. Gram positive cocci were the most common isolates in HAI as well as environmental surveillance.The bacteriological profile of HAI correlates with the environmental surveillance report thus insisting for periodic surveillance and thereby avoiding irrational antibiotic usage. Keywords: Healthcare associated infection, Neonatal intensive care unit, Environmental surveillance

  5. Polio and Measles Down the Drain: Environmental Enterovirus Surveillance in the Netherlands, 2005 to 2015.

    NARCIS (Netherlands)

    Benschop, Kimberley S M; van der Avoort, Harrie G; Jusic, Edin; Vennema, Harry; van Binnendijk, Rob; Duizer, Erwin

    2017-01-01

    Polioviruses (PVs) are members of the genus Enterovirus In the Netherlands, the exclusion of PV circulation is based on clinical enterovirus (EV) surveillance (CEVS) of EV-positive cases and routine environmental EV surveillance (EEVS) conducted on sewage samples collected in the region of the

  6. Hanford Site Environmental Surveillance Data Report for Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-09-28

    This data report contains the actual raw data used to create the tables and summaries in the Hanford Site Environmental Report for Calendar Year 2005. In addition to providing raw data collected during routine sampling efforts in 2005, this data report also includes Columbia River shoreline spring data collected by the PNNL Groundwater Performance Assessment Project, and data from collaborative studies performed by the PNNL during 2005 under partial support by the SESP. Some analytical results were not received in time to include in this report or changes may have occurred to the data following publication.

  7. Environmental monitoring and surveillance on the Oak Ridge Reservation: 1993 Data

    International Nuclear Information System (INIS)

    Koncinski, W.S.

    1994-12-01

    Environmental monitoring and surveillance are conducted on the Oak Ridge Reservation and its environs throughout the year. Environmental monitoring ensures that (1) the reservation is a safe place to work, (2) activities on the reservation do not adversely affect the neighboring communities, and (3) compliance is made with federal and state regulations. This document is a compilation of the monitoring and surveillance data for calendar year 1993. It is a tool for analysts in the fields of environmental monitoring and environmental restoration. The summary information found in the annual site environmental report was drawn from the contents of summary in this document

  8. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  9. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  10. A Belief Network Decision Support Method Applied to Aerospace Surveillance and Battle Management Projects

    National Research Council Canada - National Science Library

    Staker, R

    2003-01-01

    This report demonstrates the application of a Bayesian Belief Network decision support method for Force Level Systems Engineering to a collection of projects related to Aerospace Surveillance and Battle Management...

  11. Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment. Research project

    International Nuclear Information System (INIS)

    Martorell, S.; Serradell, V.; Munoz, A.; Sanchez, A.

    1997-01-01

    Background, objective, scope, detailed working plan and follow-up and final product of the project ''Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment'' are described

  12. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  13. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  14. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  15. Poplar Island Environmental Restoration Project Nekton Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  16. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  17. Ethics issues experienced in HBM within Portuguese health surveillance and research projects

    Directory of Open Access Journals (Sweden)

    Miguel J Pereira

    2008-01-01

    Full Text Available Abstract Background In keeping with the fundamental practice of transparency in the discussion and resolution of ethics conflicts raised by research, a summary of ethics issues raised during Portuguese biomonitoring in health surveillance and research is presented and, where applicable, their resolution is described. Methods Projects underway aim to promote the surveillance of public health related to the presence of solid waste incinerators or to study associations between human exposure to environmental factors and adverse health effects. The methodological approach involves biomonitoring of heavy metals, dioxins and/or other persistent organic pollutants in tissues including blood, human milk and both scalp and pubic hair in groups such as the general population, children, pregnant women or women attempting pregnancy. As such, the projects entail the recruitment of individuals representing different demographic and health conditions, the collection of body tissues and personal data, and the processing of the data and results. Results The issue of autonomy is raised during the recruitment of participants and during the collection of samples and data. This right is protected by the requirement for prior written, informed consent from the participant or, in the case of children, from their guardian. Recruitment has been successful, among eligible participants, in spite of incentives rarely being offered. The exception has been in obtaining guardians' consent for children's participation, particularly for blood sampling. In an attempt to mitigate the harm-benefit ratio, current research efforts include alternative less invasive biomarkers. Surveys are currently being conducted under contract as independent biomonitoring actions and as such, must be explicitly disclosed as a potential conflict of interests. Communication of results to participants is in general only practised when a health issue is present and corrective action possible

  18. Healthcare associated infections in neonatal intensive care unit and its correlation with environmental surveillance.

    Science.gov (United States)

    Kumar, Sanjay; Shankar, Binoy; Arya, Sugandha; Deb, Manorma; Chellani, Harish

    Healthcare-associated infections (HAI) are frequent complications in neonatal intensive care units (NICU) with varying risk factors and bacteriological profile. There is paucity of literature comparing the bacteriological profile of organisms causing HAI with the environmental surveillance isolates. Therefore, this study aimed to evaluate demographic profile, risk factors and outcome of HAI in NICU and correlate with environmental surveillance. Three hundred newborns with signs and symptoms of sepsis were enrolled in the study group and their profile, risk factors and outcome were compared with the control group. Univariate analysis and multivariable logistic regression were performed. Environmental surveillance results were compared to the bacteriological profile of HAIs. We identified lower gestational age, male gender and apgar score less than 7 at 5min, use of peripheral vascular catheter & ventilator along with their duration as significant risk factors. Mortality rate was 29% in the study group (p<0.05). The HAI site distribution showed blood-stream infections (73%) to be the most common followed by pneumonia (12%) and meningitis (10%). Gram positive cocci were the most common isolates in HAI as well as environmental surveillance. The bacteriological profile of HAI correlates with the environmental surveillance report thus insisting for periodic surveillance and thereby avoiding irrational antibiotic usage. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  19. Environmental surveillance monitoring in the Alligator Rivers Region. Report for the six months period ending 30 September 1996

    International Nuclear Information System (INIS)

    1996-01-01

    This report outlines the activities of the Northern Territory Supervising Authorities in meeting their responsibilities for environmental management and surveillance, occupational safety, relating to uranium mining and environment protection in the Alligator Rivers Region. Environmental monitoring was carried out at the Nabarlek Mine, which site has now been rehabilitated and revegetated, and at Ranger, the only mine currently operating in the region. Other uranium projects such as Jabiluka and Koongarra have been delayed due to the former Commonwealth Government's 'three mines policy'. 4 tabs., 10 figs

  20. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  1. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  2. Ground-water sample collection and analysis plan for the ground-water surveillance project

    International Nuclear Information System (INIS)

    Bryce, R.W.; Evans, J.C.; Olsen, K.B.

    1991-12-01

    The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy's (DOE's) Hanford Site in support of DOE's environmental surveillance responsibilities. The purpose of this document is to translate DOE's General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives

  3. Environmental projects. Volume 3: Environmental compliance audit

    Science.gov (United States)

    1987-01-01

    The Goldstone Deep Space Communications Complex is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at Goldstone are carried out in support of six large parabolic dish antennas. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL and Goldstone have adopted a position that their operating installations shall maintain a high level of compliance with Federal, state, and local laws governing the management of hazardous substances, abestos, and underground storage tanks. A JPL version of a document prepared as an environmental audit of Goldstone operations is presented. Both general and specific items of noncompliance at Goldstone are identified and recommendations are provided for corrective actions.

  4. Initial results of Pakistan's first road traffic injury surveillance project.

    Science.gov (United States)

    Shamim, Shahzad; Razzak, Junaid A; Jooma, Rashid; Khan, Uzma

    2011-09-01

    Our aim is to report the findings of the initial three years of road traffic injuries (RTI) surveillance at Karachi and to compare it with previously published RTI-related data from Pakistan and other low-and middle-income countries. Data were collected through the RTI surveillance programme at Karachi (RTIRP) from the five biggest emergency departments of the city, which receive almost all the major emergencies of the city for the period September 2006 till September 2009. A total of 99,272 victims were enlisted by the RTIRP during the study period. Annual incidence of RTI is calculated to be 184.3 per 100,000 populations and mortality is 5.7 per 100,000 populations. Eighty nine per cent of victims are male and 73% are between 15 and 44 years of age. Commonest road user to be affected is riders of two wheelers (45%). Only 7% of affected motorcyclists were found to be wearing helmets at the time of the accident. Trends of injuries remained uniform over the years. Most frequent injuries were external wounds, followed by orthopaedic injuries. On the basis of our surveillance system, we have presented the largest RTI-related data from a metropolitan city of Pakistan to date.

  5. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  6. 1995 annual epidemiologic surveillance report for Idaho National Engineering and Environmental Laboratory

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) conduct of epidemiologic surveillance provides an early warning system for health problems among workers. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report summarizes epidemiologic surveillance data collected from the Idaho National Engineering and Environmental Laboratory (INEEL) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at INEEL and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out

  7. 1995 annual epidemiologic surveillance report for Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The US Department of Energy's (DOE) conduct of epidemiologic surveillance provides an early warning system for health problems among workers. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report summarizes epidemiologic surveillance data collected from the Idaho National Engineering and Environmental Laboratory (INEEL) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at INEEL and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  8. Thermoluminescent Dosimeter Use for Environmental Surveillance at the Hanford Site, 1971–2005

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, Ernest J.; Poston, Ted M.; Rathbone, Bruce A.

    2010-03-01

    This report describes the use of thermo luminescent dosimeters for environmental surveillance of external radiation on and around the Hanford Site for the period of 1970 to 2005. It addresses changes in the technology and associated quality control and assurance used in this work and summarizes the results of the 35 year period of external radiation surveillance. The appendices to this report provide trend plots for each location that comprised the shoreline, onsite, perimeter, and offsite sample design.

  9. Design, Implementation, and Evaluation of the Adolescents and Surveillance System for the Obesity Prevention Project.

    Science.gov (United States)

    Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina

    2016-03-01

    The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents' obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data.The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have.This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries' needs and priorities.The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries' Health Services for monitoring adolescents' obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles.

  10. Environmental Control Unit Harness Project

    Science.gov (United States)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  11. Polio eradication in India: progress, but environmental surveillance and vigilance still needed.

    Science.gov (United States)

    Chatterjee, Animesh; Vidyant, Sanjukta; Dhole, Tapan N

    2013-02-18

    Poliomyelitis has appeared in epidemic form, become endemic on a global scale, and has been reduced to near elimination, all within the span of documented medical history. Nevertheless, effective vaccinations, global surveillance network, development of accurate viral diagnosis prompted the historical challenge, global polio eradication initiative (GPEI). Environmental surveillance of poliovirus means monitoring of wild polio virus (WPV) and vaccine derived polio virus (cVDPV) circulation in human populations by examining environmental specimens supposedly contaminated by human feces. The rationale for surveillance is based on the fact that PV-infected individuals, whether presenting with disease symptoms or not, shed large amounts of PV in the feces for several weeks. As the morbidity: infection ratio of PV infection is very low, and therefore this fact contributes to the sensitivity of poliovirus surveillance, which under optimal conditions can be better than that of the standard acute flaccid paralysis (AFP) surveillance. The World Health Organization (WHO) has included environmental surveillance of poliovirus in the new Strategic Plan of the Global Polio Eradication Initiative for years 2010-2012 to be increasingly used in PV surveillance, supplementing AFP surveillance and the strategic advisory group of experts on immunization (SAGE) recommended a switch from tOPV-bOPV to remove the threat of cVDPV2 and to accelerate the elimination of WPV type 1 and 3 as bOPV is a more immunogenic vaccine and to introduce one dose of IPV in their vaccination schedule prior to OPV cessation. Copyright © 2012 Elsevier Ltd. All rights reserved.

  12. Role of Hydrogeology in Professional Environmental Projects

    Science.gov (United States)

    The purpose of this presentation is to acquaint hydrogeology students how hydrogeological principles are applied in environmental engineering projects. This presentation outlines EPA's Superfund processes of site characterization, feasibility studies, and remediation processes.

  13. Radiation protection in nuclear facilities. The Caise environmental surveillance system

    International Nuclear Information System (INIS)

    Witt, H. de; Voelz, E.

    1995-01-01

    The Computer Aided Surveillance System for the Environment of Nuclear Installations (Caise) has been designed for permanent surveillance of the environment of nuclear installations under normal operating conditions and for unusual events on the basis of radiological and meteorological measured data. In normal operation, the data measured on line are fed to the system by way of a defined interface, while off-line data can be entered manually in the dialog mode. Subsequently, the measured data are stored, filed away, and secured. Short-time dispersion factors can be calculated permanently in the on-line mode, while the off-line mode allows short-term and long-term dispersions to be calculated for randomly selectable periods of time under the General Administrative Rule of Sec. 45 of the German Radiation Protection Ordinance. The corresponding dose distributions in the environment of the plant can be determined next. Under conditions of increased emissions (accidents, failures), Caise assists in quick decision-making by its capacity for real-time dispersion calculations including current on-line and off-line emission sample measurements. In this way, the contributions by various different exposure pathways to the calculated dose can be determined more accurately. (orig.) [de

  14. Blue Bahia: an environmental sanitation project

    International Nuclear Information System (INIS)

    Azcona, Miguel Angel L.; Neuvirth, Bruno

    1996-01-01

    The paper presents actions developed to incorporate some aspects of environmental sanitation to the basic sanitation project, natural resources assessing, identification of the environmental degradation sources - in addition to those caused by lack of basic sanitation, and common action between public and private sectors

  15. Environmental surveillance of low-level radioactive waste management areas at Los Alamos during 1985

    International Nuclear Information System (INIS)

    1987-01-01

    This report was compiled as a part of the DOE-sponsored radioactive waste site surveillance program at Los Alamos National Laboratory. The report is a source document for data collected in 1985. However, an attempt is made to interpret the data as it relates to radionuclide transport to serve in guiding future waste site surveillance activities. This report contains information on one active and 11 inactive radioactive waste management areas at Los Alamos. Sections include the use history, current status, and future stabilization needs for all sites; the results of detailed surveillance activities at Areas G and C; and a dose evaluation based on the waste site and Laboratory environmental surveillance data. 9 refs., 30 figs., 13 tabs

  16. Personnel, Area And Environmental Surveillance Practices At The PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Ligam, A.S.; Zarina Masood; Mohammad Suhaimi Kassim; Ismail Sulaiman; Mohd Fazli Zakaria; Ahmad Nabil Abdul Rahim

    2013-01-01

    Personnel, area and environmental surveillance at research reactors are important to ensure that the worker, public and environment do not receive radiation doses exceeding the prescribed national limits. A surveillance programme has been in place ever since the PUSPATI TRIGA Reactor (RTP) first started its operation in 1982. The results of the surveillance have to be reported to the national regulatory body as well as the International Atomic Energy Agency. This paper will discuss the findings and improvements of the surveillance programme over the past few years. It can be concluded that workers, public and the environment does not receive doses in excess of the prescribed limits due to the operation of the RTP.(author)

  17. Environmental auditing for oil drilling projects

    International Nuclear Information System (INIS)

    Zambrano Solarte, Hugo Ibsen; Olaya Amaya, Alfredo

    2003-01-01

    The enforcement of legal regulations on the environment requires some mechanisms related to preservation and conservation of natural resources, as well as paleontological and archaeological wealth, in order to allow their use without endangering their integrity. This article reviews legal regulations, activities and performance indicators, which should be taken into account by Environmental Auditors in oil projects. Additionally, a Plan for Environmental management is analyzed with its main components and procedures for performing the environmental auditing

  18. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  19. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  20. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  1. Environmental surveillance and compliance at Los Alamos during 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report presents environmental data that characterize environmental performance and addresses compliance with environmental standards and requirements at Los Alamos National Laboratory (LANL or the Laboratory) during 1996. The Laboratory routinely monitors for radiation and for radioactive nonradioactive materials at Laboratory sites as well as in the surrounding region. LANL uses the monitoring results to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1996 to assess external penetrating radiation; quantities of airborne emissions; and concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, the municipal water supply, soils and sediments, and foodstuffs. Using comparisons with standards and regulations, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, Laboratory employees, or the environment. Laboratory operations were in compliance with all major environmental regulations.

  2. Environmental surveillance and compliance at Los Alamos during 1996

    International Nuclear Information System (INIS)

    1997-09-01

    This report presents environmental data that characterize environmental performance and addresses compliance with environmental standards and requirements at Los Alamos National Laboratory (LANL or the Laboratory) during 1996. The Laboratory routinely monitors for radiation and for radioactive nonradioactive materials at Laboratory sites as well as in the surrounding region. LANL uses the monitoring results to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1996 to assess external penetrating radiation; quantities of airborne emissions; and concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, the municipal water supply, soils and sediments, and foodstuffs. Using comparisons with standards and regulations, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, Laboratory employees, or the environment. Laboratory operations were in compliance with all major environmental regulations

  3. Colonie Interim Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Colonie Interim Storage Site (CISS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, dose to the offsite population, and summaries of environmental programs at CISS. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. Appendix A contains a discussion of the nature of radiation, the way it is measured, and common sources of it. The primary environmental guidelines and limits applicable to CISS are given in US Department of Energy (DOE) orders and mandated by six federal acts: the Clean Air Act; the Clean Water Act; the Resource Conservation and Recovery Act (RCRA); the Toxic Substances Control Act; the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); and the National Environmental Policy Act (NEPA). DOE began environmental monitoring of CISS in 1984 when DOE was authorized by Congress through the Energy and Water Development Appropriations Act to conduct a decontamination research and development program at the site. The site was subsequently assigned to DOE's Formerly Utilized Sites Remedial Action Program (FUSRAP)

  4. Projects: viable alternatives in the Environmental Education?

    Directory of Open Access Journals (Sweden)

    Marcos Jose Terossi

    2011-11-01

    Full Text Available In this article we are going to develop the reflection about the projects, its genesis, its use in education and environmental education.To this end, we will promote the discussion about the so-called "method of projects" and "projects pedagogy", with a comparison between them and outlining the approach that we consider most appropriate to EA, its limits and possibilities within the critical perspective, manufacturing and emancipatory education.

  5. Environmental radiological surveillance in perspective: the relative importance of environmental media as a function of effluent pathway and radionuclides

    International Nuclear Information System (INIS)

    Denham, D.H.

    1977-10-01

    Most published guidelines for environmental surveillance emphasize the collection and analysis of specific media (e.g. air, water, milk, direct radiation) without total regard for the potential dose impact of the radionuclides expected in or actually present in the effluent streams from nuclear facilities. To determine the relative importance of medium/nuclide combinations in environmental surveillance, the experience at major ERDA sites and at operating nuclear power plants was reviewed. Typical release rates for nuclide groupings (tritium, noble gases, radioiodine, mixed fission or activation products, and transuranics) in those effluent streams were followed through various environmental pathways. By using this scheme the environmental medium which is most prominent in the critical dose pathway to man was determined. It was also possible to determine points of short-or long-term contaminant accumulation. Following these calculations, each medium was ranked for a given nuclide/effluent pathway combination providing the relative importance of sampling specific environmental media with emphasis on the radiation dose to a critical population group. Finally, the results of these environmental pathway studies are presented in tabular form to provide ready reference for environmental surveillance program design or evaluation

  6. Environmental radiological surveillance in perspective: the relative importance of environmental media as a function of effluent pathway and radionuclides

    International Nuclear Information System (INIS)

    Denham, D.H.

    1977-01-01

    Most published guidelines for environmental surveillance emphasize the collection and analysis of specific media (e.g. air, water, milk, direct radiation) without total regard for the potential dose impact of the radionuclides expected in or actually present in the effluent streams FR-om nuclear facilities. To determine the relative importance of medium/nuclide combinations in environmental surveillance, the experience at major ERDA sites and at operating nuclear power plants was reviewed. Typical release rates for nuclide groupings (tritium, noble gases, radioiodine, mixed fission or activation products, and transuranics) in those effluent streams were followed through various environmental pathways. By using this scheme the environmental medium which is most prominent in the critical dose pathway to man was determined. It was also possible to determine points of short-or long-term contaminant accumulation. Following these combination providing the relative importance of sampling specific environmental media with emphasis on the radiation dose to a critical population group. Finally, the results of these environmental pathway studies are presented in tabular form to provide ready reference for environmental surveillance program design or evaluation

  7. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  8. Polio and Measles Down the Drain: Environmental Enterovirus Surveillance in the Netherlands, 2005 to 2015.

    Science.gov (United States)

    Benschop, Kimberley S M; van der Avoort, Harrie G; Jusic, Edin; Vennema, Harry; van Binnendijk, Rob; Duizer, Erwin

    2017-07-01

    Polioviruses (PVs) are members of the genus Enterovirus In the Netherlands, the exclusion of PV circulation is based on clinical enterovirus (EV) surveillance (CEVS) of EV-positive cases and routine environmental EV surveillance (EEVS) conducted on sewage samples collected in the region of the Netherlands where vaccination coverage is low due to religious reasons. We compared the EEVS data to those of the CEVS to gain insight into the relevance of EEVS for poliovirus and nonpolio enterovirus surveillance. Following the polio outbreak in Syria, EEVS was performed at the primary refugee center in Ter Apel in the Netherlands, and data were compared to those of CEVS and EEVS. Furthermore, we assessed the feasibility of poliovirus detection by EEVS using measles virus detection in sewage during a measles outbreak as a proxy. Two Sabin-like PVs were found in routine EEVS, 11 Sabin-like PVs were detected in the CEVS, and one Sabin-like PV was found in the Ter Apel sewage. We observed significant differences between the three programs regarding which EVs were found. In 6 sewage samples collected during the measles outbreak in 2013, measles virus RNA was detected in regions where measles cases were identified. In conclusion, we detected PVs, nonpolio EVs, and measles virus in sewage and showed that environmental surveillance is useful for poliovirus detection in the Netherlands, where live oral poliovirus vaccine is not used and communities with lower vaccination coverage exist. EEVS led to the detection of EV types not seen in the CEVS, showing that EEVS is complementary to CEVS. IMPORTANCE We show that environmental enterovirus surveillance complements clinical enterovirus surveillance for poliovirus detection, or exclusion, and for nonpolio enterovirus surveillance. Even in the presence of adequate surveillance, only a very limited number of Sabin-like poliovirus strains were detected in a 10-year period, and no signs of transmission of oral polio vaccine (OPV) strains

  9. Insights from a Systematic Search for Information on Designs, Costs, and Effectiveness of Poliovirus Environmental Surveillance Systems.

    Science.gov (United States)

    Duintjer Tebbens, Radboud J; Zimmermann, Marita; Pallansch, Mark A; Thompson, Kimberly M

    2017-12-01

    Poliovirus surveillance plays a critical role in achieving and certifying eradication and will play a key role in the polio endgame. Environmental surveillance can provide an opportunity to detect circulating polioviruses prior to the observation of any acute flaccid paralysis cases. We completed a systematic review of peer-reviewed publications on environmental surveillance for polio including the search terms "environmental surveillance" or "sewage," and "polio," "poliovirus," or "poliomyelitis," and compared characteristics of the resulting studies. The review included 146 studies representing 101 environmental surveillance activities from 48 countries published between 1975 and 2016. Studies reported taking samples from sewage treatment facilities, surface waters, and various other environmental sources, although they generally did not present sufficient details to thoroughly evaluate the sewage systems and catchment areas. When reported, catchment areas varied from 50 to over 7.3 million people (median of 500,000 for the 25% of activities that reported catchment areas, notably with 60% of the studies not reporting this information and 16% reporting insufficient information to estimate the catchment area population size). While numerous studies reported the ability of environmental surveillance to detect polioviruses in the absence of clinical cases, the review revealed very limited information about the costs and limited information to support quantitative population effectiveness of conducting environmental surveillance. This review motivates future studies to better characterize poliovirus environmental surveillance systems and the potential value of information that they may provide in the polio endgame.

  10. Environmental surveillance report for the Nevada Test Site (January 1981 through December 1981)

    International Nuclear Information System (INIS)

    Scoggins, W.A.

    1982-05-01

    This report documents the environmental surveillance program at the Nevada Test Site as conducted by the Department of Energy (DOE) onsite radiological safety contractor from January 1981 through December 1981. The results and evaluations of measurements of radioactivity in air and water, and of direct gamma radiation exposure rates are presented. Relevancy to DOE concentration guides (CG'S) is established

  11. Environmental-surveillance report for the Nevada Test Site (January 1982 through December 1982)

    International Nuclear Information System (INIS)

    Scoggins, W.A.

    1983-06-01

    This report documents the environmental surveillance program at the Nevada Test Site as conducted from January 1982 through December 1982. The results and evaluations of measurements of radioactivity in air and water, and of direct gamma radiation exposure rates are presented. Relevancy to DOE concentration guides (CG's) is established

  12. Wisconsin’s Environmental Public Health Tracking Network: Information Systems Design for Childhood Cancer Surveillance

    Science.gov (United States)

    Hanrahan, Lawrence P.; Anderson, Henry A.; Busby, Brian; Bekkedal, Marni; Sieger, Thomas; Stephenson, Laura; Knobeloch, Lynda; Werner, Mark; Imm, Pamela; Olson, Joseph

    2004-01-01

    In this article we describe the development of an information system for environmental childhood cancer surveillance. The Wisconsin Cancer Registry annually receives more than 25,000 incident case reports. Approximately 269 cases per year involve children. Over time, there has been considerable community interest in understanding the role the environment plays as a cause of these cancer cases. Wisconsin’s Public Health Information Network (WI-PHIN) is a robust web portal integrating both Health Alert Network and National Electronic Disease Surveillance System components. WI-PHIN is the information technology platform for all public health surveillance programs. Functions include the secure, automated exchange of cancer case data between public health–based and hospital-based cancer registrars; web-based supplemental data entry for environmental exposure confirmation and hypothesis testing; automated data analysis, visualization, and exposure–outcome record linkage; directories of public health and clinical personnel for role-based access control of sensitive surveillance information; public health information dissemination and alerting; and information technology security and critical infrastructure protection. For hypothesis generation, cancer case data are sent electronically to WI-PHIN and populate the integrated data repository. Environmental data are linked and the exposure–disease relationships are explored using statistical tools for ecologic exposure risk assessment. For hypothesis testing, case–control interviews collect exposure histories, including parental employment and residential histories. This information technology approach can thus serve as the basis for building a comprehensive system to assess environmental cancer etiology. PMID:15471739

  13. Environmental monitoring of the Cea Valduc centre; La surveillance environnementale du site du CEAValduc

    Energy Technology Data Exchange (ETDEWEB)

    Guetat, Ph. [CEA Valduc, Dir. adjoint, 21 - Is-sur-Tille (France); Jaskula, L. [CEA Valduc, service de protection contre les rayonnements, 21 - Is-sur-Tille (France)

    2010-06-15

    This paper describes the main features of the environmental control in the vicinity of the CEA Valduc centre, explains the site specific characteristics, the surveillance policy, and some historical elements about tritium atmospheric release. Some levels of activities are given, corresponding to an exposure level below 0.02% of natural irradiation. (author)

  14. Environmental surveillance report for the Nevada Test Site (January 1980-December 1980)

    International Nuclear Information System (INIS)

    Scoggins, W.A.

    1981-01-01

    Results are presented for the environmental surveillance program at the Nevada Test Site as conducted by the Department of Energy (DOE) onsite radiological safety contractor from January 1980 through December 1980. The results and evaluations of measurements of radioactivity in air and water, and of direct gamma radiation exposure rates are presented. Relevancy to DOE concentration guides (CG'S) is established

  15. [Studies on markers of exposure and early effect in areas with arsenic pollution: methods and results of the project SEpiAs. Epidemiological surveillance in areas with environmental pollution by natural or anthropogenic arsenic].

    Science.gov (United States)

    Bustaffa, Elisa; Minichilli, Fabrizio; Andreassi, Maria Grazia; Carone, Simona; Coi, Alessio; Cori, Liliana; Faita, Francesca; Faita, Francesco; Grecchi, Sabina; Minoia, Claudio; Ronchi, Anna; Scovassi, Ivana; Sicari, Rosa; Stea, Francesco; Bianchi, Fabrizio

    2014-01-01

    Arsenic and its inorganic compounds are classified as carcinogenic to humans. Exposures to inorganic arsenic (iAs) in drinking water are associated with both carcinogenic and non-carcinogenic effects. The risk assessment of exposures to low-moderate levels of environmental arsenic (As) is a challenging objective for research and public health. The SEpiAs study, funded by the Italian Ministry of Health (CCM), was carried out in four areas with arsenic pollution prevalently of natural origin, Amiata and Viterbo areas, or of industrial origin, Taranto and Gela. 271 subjects (132 men) aged 20-44, were randomly sampled stratifying by area, gender and age classes. Individual data on residential history, socio-economic status, environmental and occupational exposures, lifestyle and dietary habits, were collected through interviews using questionnaire. In urine samples of recruited subjects, the concentration of inorganic arsenic (iAs) and methylated species (MMA, DMA) was measured using inductively coupled mass spectrometer (DRCICP- MS), after chromatographic separation (HPLC). Molecular biomarkers and biomarkers of DNA damage, as well as markers of cardiovascular risk were measured The distributions of iAs and iAs+MMA+DMA were described by area and gender, geometric mean (GM), percentiles and standard deviation (SD). The associations between As species and variables collected by questionnaire were evaluated by multiple regression analysis. Results showed a high variability of As species within and among areas. Gela and Taranto samples showed higher iAs concentration compared to Viterbo and Amiata. Subjects with iAs>1,5 μg/L or iAs+MMA+DMA>15 μg/L (thresholds suggested by the Italian Society of Reference Values), are 137 (50,6%) and 68 (25,1%), respectively. A positive association between iAs and use of drinking water emerged in the Viterbo sample, between iAs and occupational exposure in the Gela and Taranto samples. Fish consumption was associated with higher i

  16. Guide for: environmental radiological surveillance at US Department of Energy installations

    International Nuclear Information System (INIS)

    Corley, J.P.; Denham, D.H.; Jaquish, R.E.; Michels, D.E.; Olsen, A.R.; Waite, D.A.

    1981-07-01

    This second edition of the Guide, originally published in 1977, is presented as an interim revision and does not contain major changes in content. The original objectives and scope of the Guide have not changed. The Guide is intended to: provide recommended methods, procedures, and performance criteria to bring greater comparability to DOE environmental monitoring and reporting systems; provide DOE management, particularly the Headquarters' Operational and Environmental Safety Division (OESD) and field offices, with a broad review of accepted radiological surveillance practices for use in the evaluation of environmental surveillance programs at DOE facilities; and delineate the capabilities and limitations of the various environmental monitoring systems for radioactivity currently used at DOE sites, including technical areas where there is either an inadequate basis for procedural selection or where further development work may be warranted. The document is intended as a guide, not a manual of detailed mandatory procedure

  17. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  18. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  19. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  20. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  1. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates

  2. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  3. Westinghouse Hanford Company environmental surveillance annual report -- 200/600 Areas

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Huckfeldt, C.R.; Johnson, A.R.; McKinney, S.M.

    1990-06-01

    This document presents the results of near-field environmental surveillance as performed by Westinghouse Hanford Company in 1989 for the Operations Area of the Hanford Site, Richland, Washington. These activities were conducted in the 200 and 600 Areas to assess operational control on the work environment. Surveillance activities included external radiation measurements and radiological surveys of waste disposal sites, radiological control areas, and roads, as well as sampling and analysis of ambient air, surface water, groundwater, sediments, soil, and biota. 15 refs., 3 figs., 1 tab

  4. Westinghouse Hanford Company Environmental surveillance annual report--200/600 Areas

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Huckfeldt, C.R.; Johnson, A.R.; McKinney, S.M.

    1991-06-01

    This document presents the results of near-field environmental surveillance in 1990 of the Operations Area of the Hanford Site, in south central Washington State, as performed by Westinghouse Hanford Company. These activities are conducted in the 200 and 600 Areas to assess and control the impacts of operations on the workers and the local environment. Surveillance activities include sampling and analyses of ambient air, surface water, groundwater, sediments, soil, and biota. Also, external radiation measurements and radiological surveys are taken of waste disposal sites, radiological control areas, and roads. 16 refs., 3 figs., 1 tab

  5. Environmental issues of the Three Gorges project

    International Nuclear Information System (INIS)

    Fang Ziyun

    1994-01-01

    This article addresses the environmental status of the reservoir area, reservoir characteristics, and the information systems used for assessment of environmental impacts. The Three Gorges Project and the environment are examined in detail and benefits for the Yangtze River's middle reaches, the impact of inundation, and impacts on aquatic animals, human health, natural landscape, cultural relics, water temperature and quality, the river estuary, and the surrounding area are considered. (UK)

  6. Switch from oral to inactivated poliovirus vaccine in Yogyakarta Province, Indonesia: summary of coverage, immunity, and environmental surveillance.

    Science.gov (United States)

    Wahjuhono, Gendro; Revolusiana; Widhiastuti, Dyah; Sundoro, Julitasari; Mardani, Tri; Ratih, Woro Umi; Sutomo, Retno; Safitri, Ida; Sampurno, Ondri Dwi; Rana, Bardan; Roivainen, Merja; Kahn, Anna-Lea; Mach, Ondrej; Pallansch, Mark A; Sutter, Roland W

    2014-11-01

    Inactivated poliovirus vaccine (IPV) is rarely used in tropical developing countries. To generate additional scientific information, especially on the possible emergence of vaccine-derived polioviruses (VDPVs) in an IPV-only environment, we initiated an IPV introduction project in Yogyakarta, an Indonesian province. In this report, we present the coverage, immunity, and VDPV surveillance results. In Yogyakarta, we established environmental surveillance starting in 2004; and conducted routine immunization coverage and seroprevalence surveys before and after a September 2007 switch from oral poliovirus vaccine (OPV) to IPV, using standard coverage and serosurvey methods. Rates and types of polioviruses found in sewage samples were analyzed, and all poliovirus isolates after the switch were sequenced. Vaccination coverage (>95%) and immunity (approximately 100%) did not change substantially before and after the IPV switch. No VDPVs were detected. Before the switch, 58% of environmental samples contained Sabin poliovirus; starting 6 weeks after the switch, Sabin polioviruses were rarely isolated, and if they were, genetic sequencing suggested recent introductions. This project demonstrated that under almost ideal conditions (good hygiene, maintenance of universally high IPV coverage, and corresponding high immunity against polioviruses), no emergence and circulation of VDPV could be detected in a tropical developing country setting. © The Author 2014. Published by Oxford University Press on behalf of the Infectious Diseases Society of America. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  7. Surveillance and Control of Malaria Transmission in Thailand using Remotely Sensed Meteorological and Environmental Parameters

    Science.gov (United States)

    Kiang, Richard K.; Adimi, Farida; Soika, Valerii; Nigro, Joseph

    2007-01-01

    These slides address the use of remote sensing in a public health application. Specifically, this discussion focuses on the of remote sensing to detect larval habitats to predict current and future endemicity and identify key factors that sustain or promote transmission of malaria in a targeted geographic area (Thailand). In the Malaria Modeling and Surveillance Project, which is part of the NASA Applied Sciences Public Health Applications Program, we have been developing techniques to enhance public health's decision capability for malaria risk assessments and controls. The main objectives are: 1) identification of the potential breeding sites for major vector species; 2) implementation of a risk algorithm to predict the occurrence of malaria and its transmission intensity; 3) implementation of a dynamic transmission model to identify the key factors that sustain or intensify malaria transmission. The potential benefits are: 1) increased warning time for public health organizations to respond to malaria outbreaks; 2) optimized utilization of pesticide and chemoprophylaxis; 3) reduced likelihood of pesticide and drug resistance; and 4) reduced damage to environment. !> Environmental parameters important to malaria transmission include temperature, relative humidity, precipitation, and vegetation conditions. The NASA Earth science data sets that have been used for malaria surveillance and risk assessment include AVHRR Pathfinder, TRMM, MODIS, NSIPP, and SIESIP. Textural-contextual classifications are used to identify small larval habitats. Neural network methods are used to model malaria cases as a function of the remotely sensed parameters. Hindcastings based on these environmental parameters have shown good agreement to epidemiological records. Discrete event simulations are used for modeling the detailed interactions among the vector life cycle, sporogonic cycle and human infection cycle, under the explicit influences of selected extrinsic and intrinsic factors

  8. Environmental surveillance program of the Lawrence Berkeley Laboratory

    International Nuclear Information System (INIS)

    Thomas, R.H.

    1976-04-01

    The major radiological environmental impact of the Lawrence Berkeley Laboratory is due to the operation of four particle accelerators. Potential sources of population exposure at the Laboratory are discussed. The major source of population exposure due to accelerator operation arises from the prompt radiation field which consists principally of neutrons and photons. Release of small quantities of radionuclides is also a potential source of population exposure but is usually an order of magnitude less significant. Accelerator produced radiation levels at the Laboratory boundary are comparable with the magnitudes of the fluctuations found in the natural background radiation. Environmental monitoring of accelerator-produced radiation and of radionuclides is carried on throughout the Laboratory, at the Laboratory perimeter, and in the regions surrounding the Laboratory. The techniques used are described. The models used to calculate population exposure are described and discussed

  9. Do environmental projects promote gender equity?

    Science.gov (United States)

    Joekes, S

    1995-02-01

    In the 1980s, governments and development agencies began to recognize the need to consider gender issues in their environmental and natural resource management programs. First came the understanding that women play a vital role in the management of natural resources and often have a strong traditional and contemporary knowledge of their environment. To exclude them would damage the efficacy of any project. Next, donor agencies came to view women, in their roles as environmental managers, as vulnerable victims of and contributors to environmental degradation. When awareness grew of examples of women successfully fighting to conserve local resources, women were considered important local assets to be used in efforts toward better environmental management. New environmental projects began by asking whether the protected resource was used by men or women in order to target the crucial people. For example, when planning to preserve forests, it is useful to recognize that men typically use wood for construction and fencing, while women use it for cooking fires. It has become increasingly common for women to participate in water and sanitation committees. But good intentions have often been subverted. Community level management of environmental projects does not guarantee female participation. Sometimes involving women means that women do all the physical labor without receiving their fair share of the benefits. In areas where women's property rights are restricted, women will have little authority in resource management. Legal reforms are needed, but they must be complemented at the local level by collective action.

  10. Summary of environmental surveillance at Los Alamos during 1994

    International Nuclear Information System (INIS)

    1996-03-01

    Linking the Rio Grande Valley and the Jemez Mountains, New Mexico's Pajarito Plateau is home to a world-class scientific institution. Los Alamos National Laboratory (or the Laboratory), managed by the Regents of the University of California, is a government-owned, Department of Energy-supervised complex investigating all areas of modern science for the purposes of national defense, health, conservation, and ecology. This report briefly describes the environmental monitoring program for the Laboratory

  11. Hazelwood Interim Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Hazelwood Interim Storage Site (HISS) during calendar year 1993. It includes an overview of site operations, the basis for monitoring for radioactive and non-radioactive parameters, summaries of environmental program at HISS, a summary of the results, and the calculated hypothetical radiation dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. The US Department of Energy (DOE) began environmental monitoring of HISS in 1984, when the site was assigned to DOE by Congress through the energy and Water Development Appropriations Act and subsequent to DOE's Formerly Utilized Sites Remediation Action Program (FUSRAP). Contamination at HISS originated from uranium processing work conducted at Mallinckrodt Chemical Works at the St. Louis Downtown Site (SLDS) from 1942 through 1957

  12. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  13. The Hanford Environmental Dose Reconstruction Project: Overview

    International Nuclear Information System (INIS)

    Haerer, H.A.; Freshley, M.D.; Gilbert, R.O.; Morgan, L.G.; Napier, B.A.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    In 1988, researchers began a multiyear effort to estimate radiation doses that people could have received since 1944 at the U.S. Department of Energy's Hanford Site. The study was prompted by increasing concern about potential health effects to the public from more than 40 yr of nuclear activities. We will provide an overview of the Hanford Environmental Dose Reconstruction Project and its technical approach. The work has required development of new methods and tools for dealing with unique technical and communication challenges. Scientists are using a probabilistic, rather than the more typical deterministic, approach to generate dose distributions rather than single-point estimates. Uncertainties in input parameters are reflected in dose results. Sensitivity analyses are used to optimize project resources and define the project's scope. An independent technical steering panel directs and approves the work in a public forum. Dose estimates are based on review and analysis of historical data related to operations, effluents, and monitoring; determination of important radionuclides; and reconstruction of source terms, environmental conditions that affected transport, concentrations in environmental media, and human elements, such as population distribution, agricultural practices, food consumption patterns, and lifestyles. A companion paper in this volume, The Hanford Environmental Dose Reconstruction Project: Technical Approach, describes the computational framework for the work

  14. Contributions to environmental research and surveillance. Pt. 3

    International Nuclear Information System (INIS)

    Stoeppler, M.

    1980-01-01

    The current optimisation of automated or mechanised methods for the elements Pb, Cd, Hg, As, Ni, Cu, Mn, Tl etc. is demonstrated. These methods mainly include atomic absorption spectrophotometry (AAS), differential pulse stripping voltammetry (DPSV) and isotope dilution mass spectrometry (IDMS) together with the necessary sampling and sample pretreatment procedures. The application of these methods in the course of extended environmental studies is reviewed. The main application fields were: Biopsy materials as whole blood, urine and head hair, various continental and marine food, sea water, freshwater, inland waters and rainwater as well as brown and pit coal. The state-of-art of the methods applied and the results of the performed studies are finally critically discussed. (orig.) [de

  15. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  16. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  17. Ciguatera fish poisoning and environmental change: a case for strengthening health surveillance in the Pacific?

    Science.gov (United States)

    Derne, Bonnie; Fearnley, Emily; Goater, Sarah; Carter, Karen; Weinstein, Philip

    2010-09-01

    Ciguatera Fish Poisoning (CFP), a significant public health problem in the Pacific, is intrinsically linked to the health of coral reef ecosystems. Incidence data on CFP could therefore be used, in theory, as indicators of disruption to coral reefs. Some disruptions, such as increasing sea surface temperatures, result from global environmental change--therefore suggesting that CFP is likely to become an increasing public health problem in the region. The proactive management of increasing numbers of cases will depend on an understanding of the ecology of the disease, sound health surveillance systems to report cases of CFP including appropriate case definitions, and quantifiable correlations between case numbers and environmental variables. Here, we briefly review the knowledge about these components in Pacific Island Countries and Territories (PICTs), including summarising regional variation in symptoms of CFP cases, investigating media as an enhanced surveillance tool, and summarising regional environmental drivers of CFP cases. We conclude that CFP could be an important indicator of the health of reef ecosystems in the face of global climate change and more novel approaches such as combining environmental and health data, need to be implemented to improve surveillance of CFP.

  18. Environmental surveillance data report for the third quarter of 1987

    International Nuclear Information System (INIS)

    Daniels, K.L.; Goldberg, P.Y.; Horwedel, B.M.; McCollough, I.L.; Osborne-Lee, A.E.; Owenby, R.K.; Watson, J.B.; Wilson, M.M.

    1987-12-01

    During the third quarter of 1987, over 1600 samples which represent more than 5000 analyses and measurements were collected by the Environmental Monitoring and Compliance (EMC) Department. Uranium concentrations measured on air filters near the Y-12 plant were higher than normal due to a release from that facility in May. More than 60% of the noncompliances with the NPDES permit for the third quarter occurred in July. These were primarily in total suspended solids at the Sewage Treatment Plant. The cause of these high concentrations has been explored with the plant operating staff but is currently unresolved. Because of past noncompliances in fecal coliform and chlorine concentrations at the Sewage Treatment Plant, an engineering review has been initiated to examine the present chlorination system. This review is intended to provide a permanent solution to these types of problems. Maximum concentrations of total radioactive strontium ( 89 Sr + 90 Sr) in bluegill were lower than those measured during the second quarter. There were not significant differences in the total radioactive strontium in blue gill at any of the Clinch River locations. 17 figs., 45 tabs

  19. Environmental surveillance data report for the first quarter of 1988

    International Nuclear Information System (INIS)

    Blasing, T.J.; Daniels, K.L.; Goldberg, P.Y.; Horwedel, B.M.; McCollough, I.L.; Osborne-Lee, A.E.; Valentine, C.K.; Wolf, D.A.

    1988-08-01

    During the first quarter of 1988, over 1800 samples which represent more than 6000 analyses and measurements were collected by the Environmental Monitoring and Compliance (EMC) Department. More than ten real-time monitoring stations, which telemeter 10-minute averaged readings of radiation levels, total precipitation, flows, water, and air quality parameters around ORNL also reported data. In addition, three meteorological towers sent weather data at various heights to a host computer every 15-minutes. Real-time measurements of external gamma radiation are now being reported from several stations, included some recently activated or upgraded stations. Measurements this quarter indicate that external gamma radiation around ORNL is close to background, except at station 4, which is located between the Waste Treatment Plant and waste treatment ponds and therefore experiences higher levels of radiation. Cobalt-60 concentrations in Melton Branch remained low, as they had been during the fourth quarter of 1987. Lack of discharge from the HFIR ponds is the apparent cause of the reduced concentrations, as these ponds appear to be the source of most of the cobalt-60 that does occur in Melton Branch. Flow-weighted concentration of radionuclides in surface water were found to be generally much lower than the DOE derived concentration guidelines except for tritium in Melton Branch. Tritium concentrations measured at Melton Branch Site 1 exceeded the corresponding guideline by 30% during March

  20. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  1. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    International Nuclear Information System (INIS)

    Sebastian Puente

    1998-01-01

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics

  2. Radiation protection and environmental surveillance programme in and around Nuclear Fuel Cycle Facilities in India

    International Nuclear Information System (INIS)

    Tripathi, R.M.

    2018-01-01

    Radiation safety is an integral part of the operation of the Indian nuclear fuel cycle facilities and safety culture has been inculcated in all the spheres of its operation. Nuclear fuel cycle comprises of mineral exploration, mining, ore processing, fuel fabrication, power plants, reprocessing, waste management and accelerator facilities. Health Physics Division of BARC is entrusted with the responsibility of radiation protection and environmental surveillance in all the nuclear fuel cycle facilities

  3. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes

  4. Environmental surveillance for the INEL Radioactive-Waste-Management complex. Annual report 1981

    International Nuclear Information System (INIS)

    Janke, D.H.; Zahn, T.P.

    1982-09-01

    The 1981 environmental surveillance report for the Radioactive Waste Management Complex of the Idaho National Engineering Laboratory contains data and discussions about routine radiological monitoring of the atmospheric, hydrologic, and geologic environments of the RWMC. Additional discussions include results of routine monitoring of two surplus facilities, the Stationary Low-Power Reactor No. 1 Surplus Area and the Organic Moderated Reactor Experiment. Each area has produced localized effects on the environment, but containment is well within the INEL site boundary

  5. FASSET - An European project for environmental protection

    International Nuclear Information System (INIS)

    Bruchertseifer, F.

    2003-01-01

    The European research project ''FASSET'' (Framework ASSessment of Enviromental ImpacT) will provide a framework of the environmental impact of the effects of ionising radiation and will identify protection aims for the environmental protection. This project represent a collaboration of different organisations from the European community: Sweden, Norway, Finland, Great Britain, Spain, France and Germany. The German participants are the GSF-research centre for environment and health and the German radiation protection office. The project is founded by the 5 th EC research programme. The existing national and international radiation protection regulations are focused to the humans. Other species, like plants and animals, are protected indirectly, if their habitat are close to urban areas or they represent a part of the food chain. The ICRP position ''if the man is protected, nature is protected as well'' is now under reconsideration by a ICRP-Taskgroup. The identification of perilled real reference organism by the FASSET-project is an working tool for the definition of the protection aims. For that purpose the project is divided into three working packages: dosimetry, exposure pathways and effects. Another working package is responsible for the developing of the concept using the results provided by the other working packages. (orig.)

  6. Niagara Falls Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Niagara Falls Storage Site (NFSS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, a summary of the results, and the estimated dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. NFSS is in compliance with National Emission Standards for Hazardous Air Pollutants (NESHAPs) Subpart H of the Clean Air Act as well as the requirements of the National Pollutant Discharge Elimination System (NPDES) under the Clean Water Act. Located in northwestern New York, the site covers 191 acres. From 1944 to the present, the primary use of NFSS has been storage of radioactive residues that were by-products of uranium production. Most onsite areas of residual radioactivity above regulatory guidelines were remediated during the early 1980s. Additional isolated areas of onsite contamination were remediated in 1989, and the materials were consolidated into the waste containment structure in 1991. Remediation of the site has now been completed

  7. Environmental surveillance for the INEL radioactive waste management complex. Annual report, 1979

    International Nuclear Information System (INIS)

    Wickham, L.E.; Janke, D.H.

    1980-12-01

    This document is the 1979 annual environmental surveillance report for the Radioactive Waste Management Complex (RWMC) of the Idaho National Engineering Laboratory. Included are tabulated data from and discussions about routine radiological monitoring of atmospheric, hydrologic, geologic, and biotic environments of the RWMC. Also included are discussions of selected nonradiological pollutants (e.g., sodium, etc.). It is concluded that (a) RWMC operations have not adversely affected local, existing environments; (b) environmental conditions within the Transuranic Storage Area are not corrosive enough to adversely affect transuranic waste storage containers, and (c) the addition of lakebed soil to pit, trench, and soil test plot areas has altered the moisture cycle characteristic of RWMC soil

  8. Hanford environmental dose reconstruction project - an overview

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Farris, W.T.

    1996-01-01

    The Hanford Environmental Dose Reconstruction Project was initiated because of public interest in the historical releases of radioactive materials from the Hanford Site, located in southcentral Washington State. By 1986, over 38,000 pages of environmental monitoring documentation from the early years of Hanford operations had been released. Special committees reviewing the documents recommended initiation of the Hanford Environmental Dose Reconstruction Project, which began in October 1987, and is conducted by Battelle, Pacific Northwest Laboratories. The technical approach taken was to reconstruct releases of radioactive materials based on facility operating information; develop and/or adapt transport, pathway, and dose models and computer codes; reconstruct environmental, meterological, and hydrological monitoring information; reconstruct demographic, agricultural, and lifestyle characteristics; apply statistical methods to all forms of uncertainty in the information, parameters, and models; and perform scientific investigation that were technically defensible. The geographic area for the study includes ∼2 x 10 5 km 2 (75,000 mi 2 ) in eastern Washington, western Idaho, and northeastern Oregon (essentially the Mid-columbia Basin of the Pacific Northwest). Three exposure pathways were considered: the atmosphere, the Columbia River, and ground water

  9. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NS&T) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  10. National Status and Trends, Benthic Surveillance Project Sites, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set reports information regarding the nominal sampling locations for the National Status and Trends Benthic Surveillance Project sites. One record is...

  11. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NSandT) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  12. Co-ordinated research and environmental surveillance programme related to sea disposal of radioactive waste

    International Nuclear Information System (INIS)

    1984-01-01

    Sea disposal operations of packaged low-level radioactive waste are carried out under the provisions of the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter, also referred to as the London Dumping Convention. The environmental impact of this disposal method is continuously kept under review, in particular within the IAEA which has provided the ''Definition of High-Level Radioactive Waste or Other High-Level Radioactive Matter Unsuitable for Dumping at Sea'' for the purpose of the Convention and within the OECD-NEA in the framework of its Multilateral Consultation and Surveillance Mechanism for Sea Dumping of Radioactive Waste. The NEA Co-Ordinated Research and Environmental Surveillance Programme (CRESP) is focussed on the actual North-East Atlantic dump site. Its objective is to increase the available scientific data base related to the oceanographic and biological characteristics of the dump site and elaborate a site specific model of the transfers of radionuclides to human populations. Future site suitability reviews, as periodically requested under the terms of the Multilateral Consultation and Surveillance Mechanism, will therefore be based on a more accurate and comprehensive scientific basis

  13. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  14. Advancing environmental health surveillance in the US through a national human biomonitoring network.

    Science.gov (United States)

    Latshaw, Megan Weil; Degeberg, Ruhiyyih; Patel, Surili Sutaria; Rhodes, Blaine; King, Ewa; Chaudhuri, Sanwat; Nassif, Julianne

    2017-03-01

    The United States lacks a comprehensive, nationally-coordinated, state-based environmental health surveillance system. This lack of infrastructure leads to: • varying levels of understanding of chemical exposures at the state & local levels • often inefficient public health responses to chemical exposure emergencies (such as those that occurred in the Flint drinking water crisis, the Gold King mine spill, the Elk river spill and the Gulf Coast oil spill) • reduced ability to measure the impact of public health interventions or environmental policies • less efficient use of resources for cleaning up environmental contamination Establishing the National Biomonitoring Network serves as a step toward building a national, state-based environmental health surveillance system. The Network builds upon CDC investments in emergency preparedness and environmental public health tracking, which have created advanced chemical analysis and information sharing capabilities in the state public health systems. The short-term goal of the network is to harmonize approaches to human biomonitoring in the US, thus increasing the comparability of human biomonitoring data across states and communities. The long-term goal is to compile baseline data on exposures at the state level, similar to data found in CDC's National Report on Human Exposure to Environmental Chemicals. Barriers to success for this network include: available resources, effective risk communication strategies, data comparability & sharing, and political will. Anticipated benefits include high quality data on which to base public health and environmental decisions, data with which to assess the success of public health interventions, improved risk assessments for chemicals, and new ways to prioritize environmental health research. Copyright © 2016 Elsevier GmbH. All rights reserved.

  15. Atmosphere Resource Recovery & Environmental Monitoring for Long Duration Exploration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Atmosphere Resource Recovery & Environmental Monitoring (ARREM) for Long Duration Exploration Project project is maturing Atmosphere Revitalization...

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  18. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV)

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  20. West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

    Energy Technology Data Exchange (ETDEWEB)

    Steiner, Alison F. [CH2M Hill BWXT West Valley, LLC, NY (United States); Pendl, Michael P. [CH2M Hill BWXT West Valley, LLC, NY (United States); Steiner, II, Robert E. [CH2M Hill BWXT West Valley, LLC, NY (United States); Fox, James R. [CH2M Hill BWXT West Valley, LLC, NY (United States); Hoch, Jerald J. [CH2M Hill BWXT West Valley, LLC, NY (United States); Williams, Janice D. [CH2M Hill BWXT West Valley, LLC, NY (United States); Wrotniak, Chester M. [CH2M Hill BWXT West Valley, LLC, NY (United States); Werchowski, Rebecca L. [CH2M Hill BWXT West Valley, LLC, NY (United States)

    2017-09-12

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    International Nuclear Information System (INIS)

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner II, Robert E.; Fox, James R.; Hoch, Jerald J.; Wrotniak, Chester M.; Werchowski, Rebecca L.

    2016-01-01

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Wrotniak, Chester M. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2016-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  5. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  6. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2MHILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [CH2MHILL • B& W West Valley, LLC (CHBWV); Pendl, Michael P. [CH2MHILL • B& W West Valley, LLC (CHBWV)

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  7. Melancthon Grey Wind Project environmental screening report

    International Nuclear Information System (INIS)

    2005-01-01

    Canadian Hydro has proposed that the Melancthon and Grey Highlands Townships in Dufferin County, Ontario are ideally suited for the installation of a 240 MW wind farm. Assuming a turbine rating of 1.5 MW each, a total of 160 turbines could be installed. The utility has decided to undertake the project in up to 4 phases. This paper focuses on the construction and operation of a 75 MW wind turbine array (50, 1.5 MW turbines) dispersed over an area of about 3,511 hectares in the Melancthon Township. The total expected cost of the first phase is $130 million, with construction scheduled to begin in April 2005 for an in-service date of no later than March 31, 2006 to meet the Wind Power Production Incentive (WPPI) funding requirements. This environmental screening report (ESR) was completed to help Canadian Hydro fulfill regulatory requirements. It presented the project summary, the estimated capacity of the wind farm, and construction schedule. The environmental setting was also presented along with power line routing. This ESR addressed issues that may impact surface and ground water quality, air quality, soil erosion, environmental noise and disposal of waste materials. Issues affecting migratory birds, agricultural resources, community characteristics, construction related traffic, public health, historical resources and viewscapes were also addressed. The general conclusion of the ESR is that the project can be constructed, operated and decommissioned in such a manner as to minimize potentially adverse effects on the environment while enhancing the positive effects both locally and provincially. Migratory bird deaths due to collision with turbines are expected to be negligible and the effects of breeding bird habitat have been minimized through proposed mitigation measures. Environmental noise levels are expected to be within the applicable noise criteria. There will be no negative effect on property values within the viewshed of the turbines. There are many net

  8. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  9. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  10. The insertion of the environmental health surveillance in the unified health system

    Directory of Open Access Journals (Sweden)

    Edenilo Baltazar Barreira Filho

    2012-03-01

    Full Text Available The integration of environmental monitoring activities in the Unified Health System (SUS shows some characteristics that differentiate it from the practice of epidemiological surveillance. This occurs mainly because much data on exposure to environmental factors is obtained outside the health sector and the adoption of actions that seek to control and/or prevent requires, in most cases, an intra andintersectoral understanding and articulation, since the health sector is not able, by itself, to provide answers to environmental health issues.In recent years, there has been an increasingly consolidation of the field of environmental health, which includes the area of public health, accustomed to scientific knowledge, to the formulation of public policies and the corresponding interventions (actions related to the interaction between human health and both natural and anthropic environmental factors, which determine, modulate and influence such interaction, in order to improve the quality of human life from the point of view of sustainability(1.As agreed at the Ist Seminar of the National Environmental Health, held in October 2005 and consolidated in the first National Conference on Environmental Health, held in December 2009, it is understood as an area of intersectoral and interdisciplinarypractice focused on the outcomes, in human health, of ecogeossocialrelations between man and environment(1.Accordingly, the Ministry of Health has been implementing, throughout the country, a Surveillance System in Environmental Health (SINVISA, seeking the improvement of this “model” of activities, establishing expertise into the three levels of government, aiming to consolidate the practice of Environmental Health within the SUS.Normative Instruction No. 1, March 7, 2005, creates SINVISA, establishes the area of action, the scope of the three levels of management within SUS and defines the Environmental Health Surveillance as a set of actions and services

  11. Uranium mining environmental restoration project (PRAMU)

    International Nuclear Information System (INIS)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  12. Bear Creek Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    The Bear Creek Project consists of mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from six known ore bodies will take place over ten years; a 1000 tons ore/day will be constructed and operated as long as ore is available. The tailings will be stored onsite in an impoundment. The project would convert 2700 acres from grazing use to mining/milling activities for about ten years. Mining would disturb a total of 1600 acres but, because of reclamation, the max acreage disturbed at any one time would be about 1000 acres, the average being about 650 acres. Dose rates were computed for an individual in a ranch house at the nearest ranch. Conditions for the protection of the environment are proposed. Possible environmental impacts evaluated cover air, land, water, soil, vegetation, wildlife, and community. A benefit-cost analysis is made

  13. Bear Creek Project. Final environmental statement

    International Nuclear Information System (INIS)

    1977-06-01

    The Bear Creek Project consists of certain mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from nine known ore bodies will take place over a period of ten years (estimated); a mill with a nominal capacity of 1000 tons per day of ore will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 1000 tons per day, will be stored onsite in an impoundment. Environmental impacts and adverse effects are summarized

  14. Environmental surveillance and research at the Nevada Test Site: The beginning and the rationale

    International Nuclear Information System (INIS)

    Elle, D.R.; Church, B.W.; Bingham, F.E.

    1990-01-01

    Concurrently with the first nuclear-weapons tests at the Nevada Test Site (NTS) in 1951, an environmental surveillance and monitoring program was established offsite. Initial emphasis was on tracking fallout clouds and measuring external radiation exposure rates. An environmental research program was also initiated. Establishment of comprehensive programs has facilitated the ability to address issues such as the inventory and distribution of radionuclides in surface soils, reconstruction of offsite population doses, and recognition of areas requiring additional information. We have learned that a successful environmental monitoring program must be flexible and responsive to change; must address public as well as technical and regulatory concerns; and results must be continuously interpreted to ensure that all pathways are considered and the programs are proactive in their approach

  15. Environmental surveillance report for the INEL radioactive waste management complex. Annual report, 1976

    International Nuclear Information System (INIS)

    Dolenc, M.R.; Janke, D.H.

    1977-05-01

    This report describes the environmental surveillance activities during 1976 at the two solid waste facilities of the Idaho National Engineering Laboratory. The monitoring program encompasses periodic and random sampling of air, water, and soil within and adjacent to the Radioactive Waste Management Complex and SL-1 Burial Ground. It was found that operation of the Radioactive Waste Management Complex and SL-1 during 1976 had little radiological impact on the environment and radioactivity levels were shown to be within appropriate guidelines for worker safety

  16. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program

  17. Final rapid reactivation project environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA

  18. Environmental impacts associated with Project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. Radiation and ground motion are unique to this type experiment while conventional activities would be associated with any type of resource development. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. (U.S.)

  19. FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-11-01

    The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments

  20. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  1. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  2. Bangladesh Agro-Climatic Environmental Monitoring Project

    Science.gov (United States)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  3. Guidance for implementing the UMTRA Project long-term surveillance program

    International Nuclear Information System (INIS)

    1992-09-01

    The US Nuclear Regulatory Commission (NRC) has issued a general license for the custody and long-term care of US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project permanent disposal sites. The purpose of this general license is to ensure that the UMTRA disposal sites will be cared for in such a manner as to protect the public health and safety and the environment upon completion of remedial actions. The general license will be in effect for a disposal site when NRC accepts the disposal site long-term surveillance plan (LTSP) that meets the requirements of 10 CFR 40.27. The site LTSP describes in detail the long-term surveillance program, including any monitoring, maintenance, and emergency measures necessary to fulfill the conditions of the general license. This guidance document provides (1) instructions for preparing the disposal site LTSPs and (2) instructions for carrying out the UMTRA Project long-term surveillance program, including any monitoring that may be required. The information provided in this document also is in accordance with the regulatory requirements set forth in 40 CFR 192. On January 5, 1985, the US Tenth Circuit Court of Appeals remanded the groundwater standards, 40 CFR 192.02. Proposed groundwater standards were issued for comment on September 24, 1987 (52 FR 3600). When the groundwater standards become final, this document will be revised, as appropriate. This document also will be updated in response to any changes to 10 CFR 40, or in response to changes in the manner in which the long-term care of the licensed disposal sites is carried out

  4. RENDAC: Integrated System Data for the Information Control the Environmental Radiological Surveillance the National Network in Cuban Republic

    International Nuclear Information System (INIS)

    Valdes Ramos, M.; Prendes Alonso, M.

    1998-01-01

    With the objective to evaluate, process, control and to store the information that is generated in the National Environmental Radiological Surveillance Network, it is designed and I program the on-line RENDAC system that allows to capture and evaluate the parameters that characterize the environmental radiological situation

  5. High Incidence of Mammalian Orthoreovirus Identified by Environmental Surveillance in Taiwan.

    Directory of Open Access Journals (Sweden)

    Matthew C Y Lim

    Full Text Available Wild poliovirus (WPV persists in diverse locales worldwide, spreading outward from endemic areas. In response to the international threat of WPV transmission and changes in the national vaccination policy, we established an environmental surveillance system to monitor the circulation of wild and vaccine-related poliovirus in Taiwan. From July 2012 to December 2013, we collected sewage specimens every month from 10 sewage treatment plants located throughout Taiwan. The specimens were concentrated by the two-phase separation method and then inoculated into L20B, RD, and A549 cells for virus isolation. Viral isolates were identified and serotyped by immunofluorescence assay or molecular analysis. A total of 300 sewage samples were collected, and the results showed 163 samples (54.3% were positive for virus, and 268 isolates were identified. Among these, 75 samples (25% were positive for enterovirus (EV, but no poliovirus was found. In addition, 92 isolates were identified as enteroviruses and the most common serotypes were coxsackievirus B4, coxsackievirus B3, and coxsackievirus B2. Interestingly, 102 (34% and 82 (27.3% specimens were positive for mammalian orthoreovirus (MRV and adenovirus, respectively. This study confirmed that sewage surveillance can be a useful additional modality for monitoring the possible presence of wild-type or vaccine-derived poliovirus in wastewater, and can indicate the current types of viruses circulating in the population. Furthermore, since MRV was found in children with acute necrotizing encephalopathy and meningitis, the high incidence of MRV detected by environmental surveillance warrants further investigation.

  6. Environmental surveillance results for 1995 for the Hazelwood Interim Storage Site

    International Nuclear Information System (INIS)

    McCague, J.C.

    1996-01-01

    This memorandum presents and interprets analytical results and measurements obtained as part of the 1995 environmental surveillance program for the Hazelwood Interim Storage Site (HISS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The discussion provides a comparative analysis of average historical background conditions and applicable regulatory criteria to the 1995 results reported for external gamma radiation and for samples from the media investigated (air, surface water, sediment, groundwater, and stormwater). Results from the 1995 environmental surveillance program at HISS indicate that, with the exception of thorium-230 in streambed sediment, applicable US Department of Energy (DOE) guidelines were not exceeded for any measured parameter or for any dose calculated for potentially exposed members of the general public. In the absence of sediment guidelines, DOE soil guidelines serve as a standard of comparison for data obtained from stream bed sediment; two samples from downstream locations contained concentrations of thorium-230 that exceeded DOE soil guidelines. All stormwater sample results were in compliance with permit-specified limits. Other radioactive materials include radium 226 and natural uranium

  7. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  8. Environmental surveillance for the EG and G Idaho Radioactive Waste Management areas at the Idaho National Engineering Laboratory. Annual report 1985

    International Nuclear Information System (INIS)

    Reyes, B.D.; Case, M.J.; Wilhelmsen, R.N.

    1986-08-01

    The 1985 environmental surveillance report for the EG and G Idaho, Inc., radioactive waste management areas at the Idaho National Engineering Laboratory describes the environmental monitoring activities at the Radioactive Waste Management Complex (RWMC), the Waste Experimental Reduction Facility (WERF), the Process Experimental Pilot Plant (PREPP), and two surplus facilities. The purpose of these monitoring activities is to provide for continuous evaluation and awareness of environmental conditions resulting from current operations, to detect significant trends, and to project possible future conditions. This report provides a public record comparing RWMC, WERF, PREPP, and surplus facility environmental data with past results and radiation protection standards or concentration guides established for operation of Department of Energy facilities

  9. Environmentally Preferable Coatings for Structural Steel Project

    Science.gov (United States)

    Lewis, Pattie L. (Editor)

    2014-01-01

    The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described a the "launch support and infrastructure modernization program" in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion resistant coatings for launch facilities and ground support equipment. The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. Number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of corrosion protective coating system.

  10. Strengthening laboratory capacity through the surveillance of rotavirus gastroenteritis in Central Africa: the Surveillance Épidémiologique en Afrique Centrale (SURVAC) Project.

    Science.gov (United States)

    Waku-Kouomou, Diane; Esona, Mathew D; Pukuta, Elizabeth; Gouandijka-Vasilache, Ionela; Boula, Angeline; Dahl, Benjamin A; Mondonge, Vital; Mekontso, David; Guifara, Gilbert; Mbary-Daba, Regis; Lewis, Jamie; Yahaya, Ali Ahmed; Mwenda, Jason M; Cavallaro, Kathleen F; Gody, Jean Chrysostome; Muyembe, Jean-Jacques; Koki-Ndombo, Paul; Bowen, Michael D

    2016-01-01

    The goal of the SURVAC pilot project was to strengthen disease surveillance and response in three countries; Cameroon (CAE), Democratic Republic of the Congo (DRC) and Central African Republic (CAR). Seven laboratories involved in rotavirus surveillance were provided with equipment, reagents and supplies. CDC and WHO staff provided on-site classroom and bench training in biosafety, quality assurance, quality control (QC), rotavirus diagnosis using Enzyme Immunoassay (EIA) and genotyping of rotavirus strains using the Reverse Transcription Polymerase-chain reaction (RT-PCR). All laboratory data were reported through WHO/AFRO. Twenty-three staff members were trained on RT-PCR for rotavirus genotyping which was introduced for the first time in all three countries. In CAE, the number of samples analysed by EIA and RT-PCR increased tenfold between 2007 and 2013. In DRC, this number increased fivefold, from 2009 to 2013 whereas in CAR, it increased fourfold between 2011 and 2013. All laboratories passed WHO proficiency testing in 2014. Laboratory capacity was strengthened through equipping laboratories and strengthening a subregional laboratory workforce for surveillance of rotavirus gastroenteritis. Each of the three countries generated rotavirus surveillance and genotyping data enabling the mapping of circulating genotypes. These results will help monitor the impact of rotavirus vaccination in these countries. © 2015 John Wiley & Sons Ltd.

  11. Final Report for LDRD Project 02-FS-009 Gigapixel Surveillance Camera

    Energy Technology Data Exchange (ETDEWEB)

    Marrs, R E; Bennett, C L

    2010-04-20

    The threats of terrorism and proliferation of weapons of mass destruction add urgency to the development of new techniques for surveillance and intelligence collection. For example, the United States faces a serious and growing threat from adversaries who locate key facilities underground, hide them within other facilities, or otherwise conceal their location and function. Reconnaissance photographs are one of the most important tools for uncovering the capabilities of adversaries. However, current imaging technology provides only infrequent static images of a large area, or occasional video of a small area. We are attempting to add a new dimension to reconnaissance by introducing a capability for large area video surveillance. This capability would enable tracking of all vehicle movements within a very large area. The goal of our project is the development of a gigapixel video surveillance camera for high altitude aircraft or balloon platforms. From very high altitude platforms (20-40 km altitude) it would be possible to track every moving vehicle within an area of roughly 100 km x 100 km, about the size of the San Francisco Bay region, with a gigapixel camera. Reliable tracking of vehicles requires a ground sampling distance (GSD) of 0.5 to 1 m and a framing rate of approximately two frames per second (fps). For a 100 km x 100 km area the corresponding pixel count is 10 gigapixels for a 1-m GSD and 40 gigapixels for a 0.5-m GSD. This is an order of magnitude beyond the 1 gigapixel camera envisioned in our LDRD proposal. We have determined that an instrument of this capacity is feasible.

  12. Transport Infrastructure Surveillance and Monitoring by Electromagnetic Sensing: The ISTIMES Project

    Directory of Open Access Journals (Sweden)

    Marie Bost

    2010-11-01

    Full Text Available The ISTIMES project, funded by the European Commission in the frame of a joint Call “ICT and Security” of the Seventh Framework Programme, is presented and preliminary research results are discussed. The main objective of the ISTIMES project is to design, assess and promote an Information and Communication Technologies (ICT-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring of critical transport infrastructures. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance and real time data imaging of the critical transport infrastructures. The project exploits different non-invasive imaging technologies based on electromagnetic sensing (optic fiber sensors, Synthetic Aperture Radar satellite platform based, hyperspectral spectroscopy, Infrared thermography, Ground Penetrating Radar-, low-frequency geophysical techniques, Ground based systems for displacement monitoring. In this paper, we show the preliminary results arising from the GPR and infrared thermographic measurements carried out on the Musmeci bridge in Potenza, located in a highly seismic area of the Apennine chain (Southern Italy and representing one of the test beds of the project.

  13. The use of environmental DNA in invasive species surveillance of the Great Lakes commercial bait trade.

    Science.gov (United States)

    Nathan, Lucas R; Jerde, Christopher L; Budny, Michelle L; Mahon, Andrew R

    2015-04-01

    Over 180 non-native species have been introduced in the Laurentian Great Lakes region, many posing threats to native species and ecosystem functioning. One potential pathway for introductions is the commercial bait trade; unknowing or unconcerned anglers commonly release unused bait into aquatic systems. Previous surveillance efforts of this pathway relied on visual inspection of bait stocks in retail shops, which can be time and cost prohibitive and requires a trained individual that can rapidly and accurately identify cryptic species. Environmental DNA (eDNA) surveillance, a molecular tool that has been used for surveillance in aquatic environments, can be used to efficiently detect species at low abundances. We collected and analyzed 576 eDNA samples from 525 retail bait shops throughout the Laurentian Great Lake states. We used eDNA techniques to screen samples for multiple aquatic invasive species (AIS) that could be transported in the bait trade, including bighead (Hypophthalmichthys nobilis) and silver carp (H. molitrix), round goby (Neogobius melanostomus), tubenose goby (Proterorhinus marmoratus), Eurasian rudd (Scardinius erythrophthalmus), and goldfish (Carassius auratus). Twenty-seven samples were positive for at least one target species (4.7% of samples), and all target species were found at least once, except bighead carp. Despite current regulations, the bait trade remains a potential pathway for invasive species introductions in the Great Lakes region. Alterations to existing management strategies regarding the collection, transportation, and use of live bait are warranted, including new and updated regulations, to prevent future introductions of invasive species in the Great Lakes via the bait trade. © 2014 Society for Conservation Biology.

  14. Program of environmental radiological surveillance of the radioactive wastes storage center of Maquixco in the period January-December 1991

    International Nuclear Information System (INIS)

    Gaso P, M.I.

    1991-12-01

    The primary objective of all program of environmental radiological surveillance (PVRA), it is to follow the evolution of the radioactive content of the links of the chains that constitute the different ways of transfer of the radioactivity toward the man, with the purpose of making a realistic evaluation of the environmental impact produced by the installation under surveillance. In the CADER in Mexico, only accidents or escapes of radioactivity of slow evolution can be detected. At the moment the radioactive wastes in this installation are not treated. In this report the results obtained during the year 1991 are presented. (Author)

  15. Contribution of Environmental Surveillance Toward Interruption of Poliovirus Transmission in Nigeria, 2012-2015.

    Science.gov (United States)

    Johnson Muluh, Ticha; Hamisu, Abdullahi Walla; Craig, Kehinde; Mkanda, Pascal; Andrew, Etsano; Adeniji, Johnson; Akande, Adefunke; Musa, Audu; Ayodeji, Isiaka; Nicksy, Gumede; Banda, Richard; Tegegne, Sisay G; Nsubuga, Peter; Oyetunji, Ajiboye; Diop, Ousmane; Vaz, Rui G; Muhammad, Ado J G

    2016-05-01

    Cases of paralysis caused by poliovirus have decreased by >99% since the 1988 World Health Assembly's resolution to eradicate polio. The World Health Organization identified environmental surveillance (ES) of poliovirus in the poliomyelitis eradication strategic plan as an activity that can complement acute flaccid paralysis (AFP) surveillance. This article summarizes key public health interventions that followed the isolation of polioviruses from ES between 2012 and 2015. The grap method was used to collect 1.75 L of raw flowing sewage every 2-4 weeks. Once collected, samples were shipped at 4 °C to a polio laboratory for concentration. ES data were then used to guide program implementation. From 2012 to 2015, ES reported 97 circulating vaccine-derived polioviruses (cVDPV2) and 14 wild polioviruses. In 2014 alone, 54 cVDPV type 2 cases and 1 WPV type 1 case were reported. In Sokoto State, 58 cases of AFP were found from a search of 9426 households. A total of 2 252 059 inactivated polio vaccine and 2 460 124 oral polio vaccine doses were administered to children aged poliovirus transmission in Nigeria. © 2016 World Health Organization; licensee Oxford Journals.

  16. Environmental surveillance for EG ampersand G Idaho Waste Management facilities at the Idaho National Engineering Laboratory. 1993 annual report

    International Nuclear Information System (INIS)

    Wilhelmsen, R.N.; Wright, K.C.; McBride, D.W.; Borsella, B.W.

    1994-08-01

    This report describes calendar year 1993 environmental surveillance activities of Environmental Monitoring of EG ampersand G Idaho, Inc., performed at EG ampersand G Idaho operated Waste Management facilities at the Idaho National Engineering Laboratory (INEL). The major facilities monitored include the Radioactive Waste Management Complex, the Waste Experimental Reduction Facility, the Mixed Waste Storage Facility, and two surplus facilities. Included are results of the sampling performed by the Radiological and Environmental Sciences Laboratory and the United States Geological Survey. The primary purposes of monitoring are to evaluate environmental conditions, to provide and interpret data, to ensure compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1993 environmental surveillance data with US Department of Energy derived concentration guides and with data from previous years

  17. Annual report -- 1992: Environmental surveillance for EG ampersand G Idaho Waste Management Facilities at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Wilhelmsen, R.N.; Wright, K.C.; McBride, D.W.

    1993-08-01

    This report describes the 1992 environmental surveillance activities of the Environmental Monitoring Unit of EG ampersand G Idaho, Inc., at EG ampersand G Idaho-operated Waste Management facilities at the Idaho National Engineering Laboratory (INEL). The major facilities monitored include the Radioactive Waste Management Complex, the Waste Experimental Reduction Facility, the Mixed Waste Storage Facility, and two surplus facilities. Included are some results of the sampling performed by the Radiological and Environmental Sciences Laboratory and the United States Geological Survey. The primary purposes of monitoring are to evaluate environmental conditions, to provide and interpret data, to ensure compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1992 environmental surveillance data with DOE derived concentration guides, and with data from previous years

  18. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates

  19. The burden of rare cancers in Italy: the surveillance of rare cancers in Italy (RITA) project.

    Science.gov (United States)

    Trama, Annalisa; Mallone, Sandra; Ferretti, Stefano; Meduri, Francesca; Capocaccia, Riccardo; Gatta, Gemma

    2012-01-01

    The project Surveillance of rare cancers in Italy (RITA) provides, for the first time, estimates of the burden of rare cancers in Italy based on the list of rare cancers proposed in collaboration with the European project Surveillance of Rare Cancers in Europe (RARECARE). RITA analyzed data from Italian population-based cancer registries (CR). The period of diagnosis was 1988 to 2002, and vital status information was available up to December 31, 2003. Incidence rates were estimated for the period 1995-2002, survival for the years 2000-2002 (with the period method of Brenner), and complete prevalence at January 1, 2003. Rare cancers are those with an incidence <6/100,000/year. In Italy, every year there are 60,000 new diagnoses of rare cancers corresponding to 15% of all new cancer diagnoses. Five-year relative survival was on the average worse for rare cancers (53%) than for common cancers (73%). A total of 770,000 patients were living in Italy in 2008 with a diagnosis of a rare cancer, 22% of the total cancer prevalence. Our estimates constitute a useful base for further research and support the idea that rare cancers are a public health problem that deserves attention. Centers of expertise for rare cancers that pool cases, expertise and resources could ensure an adequate clinical management for these diseases. Our data also showed that cancer registries are suitable sources of data to estimate incidence, prevalence and survival for rare cancers and should continue to monitoring rare cancers in Italy.

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    International Nuclear Information System (INIS)

    2009-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. Validity and design of environmental surveillance systems for operating nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Eichholz, G.G.

    1977-12-01

    The composition and procedures of environmental surveillance programs at completed and operating nuclear power plants have been examined with respect to their validity, continuing significance and cost. It was found that many programs contain components that are mainly an extension of preoperational baseline measurements that need not be continued indefinitely and that others lack the statistical validity to make their continued application meaningful. To identify the practical limits imposed by counting statistics and realistic equipment capacity measurements were done on iodine-131 and cesium-137 containing samples to establish detectability limits and proportionate costs for sample preparation and counting. It was found that under commercial conditions effective detectability limits and expected confidence limits were substantially higher than those mentioned in NRC Regulatory Guides. This imposes a need for either selecting fewer samples and counting them for longer times or accepting a lesser accuracy on more samples, within the bounds of reasonable cost per sample

  3. Release monitoring and environmental surveillance of Cea centers. Assessment and regulation and method 1999

    International Nuclear Information System (INIS)

    2000-01-01

    The quality of the natural environment around the centers of the Commissariat a l Energie Atomique is an important point of its safety policy. The environmental protection is based on the control of risks coming from research and development activities of its installations. It aims to reduce as low as possible, the impact of its activities on man and his environment. This publication develops the sampling and measurement methods that are made on effluents and in environment, according to the radionuclides characteristics, that are present. It gives also the regulation that applied to the effluents monitoring. The results of radioactive effluents releases (liquid and gaseous) and the surveillance of environment around cea centers is given in the 'Bilan 1999' publication. An analysis of these results on the 1995-1999 period allows to follow their evolution. (N.C.)

  4. Management of environmental health issues for the 2004 Athens Olympic Games: is enhanced integrated environmental health surveillance needed in every day routine operation?

    Directory of Open Access Journals (Sweden)

    Chervoni Julia

    2006-12-01

    Full Text Available Abstract Background Management of environmental health issues is an integral part of public health systems. An active integrated environmental health surveillance and response system was developed for the Athens Olympics to monitor and prevent exposure to environmental hazards. The potential for permanent implementation of the program was examined. Methods The environmental health surveillance and response system included standardization, computerization and electronic transmission of data concerning environmental inspections of 17 site categories (restaurants, swimming pools etc of public health interest, drinking and recreational water examinations and suggested corrective actions. The Olympic Planning Unit integrated and centrally managed data from 13 public health agencies, recommended, supervised and coordinated prompt corrective actions. Methods used to test the effectiveness of the program were the assessment of water quality test and inspection results trends over time using linear regression and epidemiological surveillance findings. Results Between January 2003 and September the 30th, 2004, 196 inspectors conducted 8562 inspections, collected 5024 water samples and recommended 17 027 corrective actions. In 10 cruise ships used as floating hotels inspectors conducted 10 full inspections, 2 re-inspections, and 27 follow-up inspections. Unsatisfactory inspection results (r = 0.44, p Conclusion Lessons learned for future events include timely implementation and installation of communication processes, and rapid and coordinated response to unsatisfactory inspection results. Routine national programs need to adopt enhanced environmental health surveillance aimed at public health decision-making, but with a different perspective.

  5. Management of environmental health issues for the 2004 Athens Olympic Games: is enhanced integrated environmental health surveillance needed in every day routine operation?

    Science.gov (United States)

    Hadjichristodoulou, Christos; Mouchtouri, Varvara; Vaitsi, Vasiliki; Kapoula, Christina; Vousoureli, Anastasia; Kalivitis, Isidiros; Chervoni, Julia; Papastergiou, Panagiotis; Vasilogiannakopoulos, Antonios; Daniilidis, Vasilis D; Kremastinou, Jenny

    2006-12-18

    Management of environmental health issues is an integral part of public health systems. An active integrated environmental health surveillance and response system was developed for the Athens Olympics to monitor and prevent exposure to environmental hazards. The potential for permanent implementation of the program was examined. The environmental health surveillance and response system included standardization, computerization and electronic transmission of data concerning environmental inspections of 17 site categories (restaurants, swimming pools etc) of public health interest, drinking and recreational water examinations and suggested corrective actions. The Olympic Planning Unit integrated and centrally managed data from 13 public health agencies, recommended, supervised and coordinated prompt corrective actions. Methods used to test the effectiveness of the program were the assessment of water quality test and inspection results trends over time using linear regression and epidemiological surveillance findings. Between January 2003 and September the 30th, 2004, 196 inspectors conducted 8562 inspections, collected 5024 water samples and recommended 17 027 corrective actions. In 10 cruise ships used as floating hotels inspectors conducted 10 full inspections, 2 re-inspections, and 27 follow-up inspections. Unsatisfactory inspection results (r = 0.44, p quality tests (r = 0.39, p restaurant which accommodated athletes during a test event. Lessons learned for future events include timely implementation and installation of communication processes, and rapid and coordinated response to unsatisfactory inspection results. Routine national programs need to adopt enhanced environmental health surveillance aimed at public health decision-making, but with a different perspective.

  6. A latent process model for forecasting multiple time series in environmental public health surveillance.

    Science.gov (United States)

    Morrison, Kathryn T; Shaddick, Gavin; Henderson, Sarah B; Buckeridge, David L

    2016-08-15

    This paper outlines a latent process model for forecasting multiple health outcomes arising from a common environmental exposure. Traditionally, surveillance models in environmental health do not link health outcome measures, such as morbidity or mortality counts, to measures of exposure, such as air pollution. Moreover, different measures of health outcomes are treated as independent, while it is known that they are correlated with one another over time as they arise in part from a common underlying exposure. We propose modelling an environmental exposure as a latent process, and we describe the implementation of such a model within a hierarchical Bayesian framework and its efficient computation using integrated nested Laplace approximations. Through a simulation study, we compare distinct univariate models for each health outcome with a bivariate approach. The bivariate model outperforms the univariate models in bias and coverage of parameter estimation, in forecast accuracy and in computational efficiency. The methods are illustrated with a case study using healthcare utilization and air pollution data from British Columbia, Canada, 2003-2011, where seasonal wildfires produce high levels of air pollution, significantly impacting population health. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  7. Radioactive waste disposal areas and associated environmental surveillance data at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Oakes, T.W.; Shank, K.E.

    1979-12-01

    Environmental surveillance data have been collected around radioactive waste disposal areas for the past thirty years at Oak Ridge National Laboratory (ORNL). The wealth of data collected around the ORNL radioactive waste burial grounds is presented in this review. The purpose of this paper is to describe the solid waste burial grounds in detail along with the environmental monitoring data. The various monitoring systems are reviewed, and the liquid discharge trends are discussed. Monitoring at White Oak Dam, the last liquid control point for the Laboratory, was started in the late 1940's and is continuing. Presently, a network of five environmental monitoring stations is in operation to monitor the radionuclide content of surface waters in the White Oak Creek watershed. Facts observed during the lifetime of the disposal sites include: (1) a large amount of 106 Ru released during 1959 to 1964 due to the fact that Conasauga shale did not retain this element as well as it retained other radionuclides. (2) Large quantities of tritiated water have been released to the Clinch River in recent years, but, from a practical standpoint, little can be done to inhibit or control these releases. (3) A general downward trend in the number of curies released has been observed for all other radionuclides. A number of corrective measures that have been initiated at ORNL to reduce the radioactive liquid discharges are outlined in the paper

  8. Avian influenza shedding patterns in waterfowl: implications for surveillance, environmental transmission, and disease spread

    Science.gov (United States)

    Henaux, Viviane; Samuel, Michael D.

    2011-01-01

    Despite the recognized importance of fecal/oral transmission of low pathogenic avian influenza (LPAI) via contaminated wetlands, little is known about the length, quantity, or route of AI virus shed by wild waterfowl. We used published laboratory challenge studies to evaluate the length and quantity of low pathogenic (LP) and highly pathogenic (HP) virus shed via oral and cloacal routes by AI-infected ducks and geese, and how these factors might influence AI epidemiology and virus detection. We used survival analysis to estimate the duration of infection (from virus inoculation to the last day virus was shed) and nonlinear models to evaluate temporal patterns in virus shedding. We found higher mean virus titer and longer median infectious period for LPAI-infected ducks (10–11.5 days in oral and cloacal swabs) than HPAI-infected ducks (5 days) and geese (7.5 days). Based on the median bird infectious dose, we found that environmental contamination is two times higher for LPAI- than HPAI-infectious ducks, which implies that susceptible birds may have a higher probability of infection during LPAI than HPAI outbreaks. Less environmental contamination during the course of infection and previously documented shorter environmental persistence for HPAI than LPAI suggest that the environment is a less favorable reservoir for HPAI. The longer infectious period, higher virus titers, and subclinical infections with LPAI viruses favor the spread of these viruses by migratory birds in comparison to HPAI. Given the lack of detection of HPAI viruses through worldwide surveillance, we suggest monitoring for AI should aim at improving our understanding of AI dynamics (in particular, the role of the environment and immunity) using long-term comprehensive live bird, serologic, and environmental sampling at targeted areas. Our findings on LPAI and HPAI shedding patterns over time provide essential information to parameterize environmental transmission and virus spread in predictive

  9. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  10. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  11. Preoperational radiation surveillance of the WIPP project by EEG during 1992

    International Nuclear Information System (INIS)

    Kenney, J.W.

    1994-02-01

    The purpose of the EEG preoperational monitoring program is to document the existing concentrations of selected radionuclides in various environmental media collected from the vicinity of the WIPP site to provide a basis of comparison of any effects of future WT-PP operations. The basic methodology for conducting environmental surveillance both on-site and off-site was outlined by Spiegler (1984). This report represents a continuation of the EEG baseline data beginning in 1985, previously reported in EEG-43, EEG-47, EEG-49 and EEG-51. Such radionuclide baseline data are important in order to determine whether future WIPP operations with radioactive waste have affected concentrations of these radionuclides in the environment. EEG data are consistent with similar environmental measurements obtained by DOE beginning in 1985. Since late 1985, the EEG has collected or received as split samples 2 443 air filters with particulates, 202 water samples, 16 biota samples and 13 soil/sediment samples. A total of 5,946 specific radionuclide analyses have been performed on these samples. As reported previously by EEG (EEG-43, EEG-47, EEG-49 and EEG-51), observed concentrations of U-238 daughter radionuclides were not in equilibrium with the parent radionuclide in water samples. This observation is consistent with different radionuclide mobility in the environment. In a notice of proposed rule making for 40 CFR 141 (US EPA 1991), the Environmental Protection Agency (EPA) National Primary Drinking Water Regulations reflect this in the calculated activity-to-mass ratio of 1.3 pCi/μg of uranium using a geometric mean of the U-234:U-238 ratio in water supplies of 2.7. Ra-226 and Ra- 228 were reported in a number of water samples in concentrations similar to those previously published by EEG and DOE

  12. Environmental management audit, Uranium Mill Tailings Remedial Action Project (UMTRA)

    International Nuclear Information System (INIS)

    1993-01-01

    The Office of Environment, Safety and Health (EH) has established, as part of the internal oversight responsibilities within Department of Energy (DOE), a program within the Office of Environmental Audit (EH-24), to conduct environmental audits at DOE's operating facilities. This document contains the results of the Environmental Management Audit of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This Environmental Management Audit was conducted by the DOE's Office of Environmental Audit from October 26 through November 6, 1992. The audit's objective is to advise the Secretary as to the adequacy of UMTRA's environmental programs, and management organization in ensuring environmental protection and compliance with Federal, state, and DOE environmental requirements. This Environmental Management Audit's scope was comprehensive and covered all areas of environmental management with the exception of environmental programs pertaining to the implementation of the requirements of the National Environmental Policy Act (NEPA), which is the responsibility of the DOE Headquarters Office of NEPA Oversight

  13. Italian network for obesity and cardiovascular disease surveillance: a pilot project.

    Science.gov (United States)

    Donfrancesco, Chiara; Lo Noce, Cinzia; Brignoli, Ovidio; Riccardi, Gabriele; Ciccarelli, Paola; Dima, Francesco; Palmieri, Luigi; Giampaoli, Simona

    2008-09-29

    Also in Mediterranean countries, which are considered a low risk population for cardiovascular disease (CVD), the increase in body mass index (BMI) has become a public health priority. To evaluate the feasibility of a CVD and obesity surveillance network, forty General Practitioners (GPs) were engaged to perform a screening to assess obesity, cardiovascular risk, lifestyle habits and medication use. A total of 1,046 women and 1,044 men aged 35-74 years were randomly selected from GPs' lists stratifying by age decade and gender. Anthropometric and blood pressure measurements were performed by GPs using standardized methodologies. BMI was computed and categorized in normal weight (BMI 18.5-24.9 kg/m2), overweight (BMI 25.0-29.9 kg/m2) and obese (BMI > or = 30 kg/m2). Food frequency (per day: fruits and vegetables; per week: meat, cheese, fish, pulses, chocolate, fried food, sweet, wholemeal food, rotisserie food and sugar drink) and physical activity (at work and during leisure time) were investigated through a questionnaire. CVD risk was assessed using the Italian CUORE Project risk function. The percentage of missing values was very low. Prevalence of overweight was 34% in women and 50% in men; prevalence of obesity was 23% in both men and women. Level of physical activity was mostly low or very low. BMI was inversely associated with consumption of pulses, rotisserie food, chocolate, sweets and physical activity during leisure time and directly associated with consumption of meat. Mean value of total cardiovascular risk was 4% in women and 11% in men. One percent of women and 16% of men were at high cardiovascular risk (> or = 20% in 10 years). Normal weight persons were four times more likely to be at low risk than obese persons. This study demonstrated the feasibility of a surveillance network of GPs in Italy focusing on obesity and other CVD risk factors. It also provided information on lifestyle habits, such as diet and physical activity.

  14. Fernald Environmental Management Project 1995 site environmental report summary

    International Nuclear Information System (INIS)

    1996-06-01

    This report summarizes the 1995 Site Environmental Report for the Fernald site. It describes the Fernald site mission, exposure pathways, and environmental standards and guidelines. An overview is presented of the impact these activities have on the local environment and public health. Environmental monitoring activities measure and estimate the amount of radioactive and nonradioactive materials that may leave the site and enter the surrounding environment

  15. Fernald Environmental Management Project 1995 site environmental report

    International Nuclear Information System (INIS)

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Also included in this report is information concerning the site's progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA

  16. Housing projects in Trabzon: Marketting discourses and physical environmental features

    OpenAIRE

    AYDIN TÜRK, Yelda; KARADENİZ, Beyza

    2018-01-01

    Thehousing projects, that have turned into concept projects promoted as acommodity since last decade in Turkey. These projects, are marketed withdiscourses such as “the long-awaited life”, “ideal home” and are constructed onthe urban fringes. In this study, the housing projects that developed inTrabzon in recent years have been examined in this context. Marketing discourseand physical environmental characteristics of the projects have been analyzed.Thus, the study finds out to what extent the...

  17. Overview of a comprehensive environmental monitoring and surveillance program: The role of fish and wildlife

    International Nuclear Information System (INIS)

    Gray, R.H.

    1988-05-01

    Concern about the effects of potential releases from nuclear and non-nuclear activities on the US Department of Energy's Hanford Site in southeastern Washington has evolved over four decades into a comprehensive environmental monitoring and surveillance program. The program includes field sampling, and chemical and physical analyses of air, surface and ground water, fish and wildlife, soil, foodstuffs, and natural vegetation. In addition to monitoring radioactivity in fish and wildlife, population numbers of key species are determined, usually during the breeding season. Data from monitoring efforts are used to assess the environmental impacts of Hanford operations and calculate the overall radiological dose to humans onsite, at the Site perimeter, or residing in nearby communities. Chinook salmon spawning in the Columbia River at Hanford has increased in recent years with a concomitant increase in winter nesting activity of bald eagles (Haliaeetus leucocephalus). An elk (Cervus elaphus) herd, established by immigration in 1972, is also increasing. Nesting Canada goose (Branta canadensis) and great blue heron (Ardea herodias), and various other animals, e.g., mule deer (Odocoileus hemionus) and coyotes (Canis latrans) are common. Measured exposure to penetrating radiation and calculated radiation doses to the public are well below applicable regulatory limits

  18. Environmental surveillance in the Marshall Islands: an application of alternative energy sources in the Third World

    International Nuclear Information System (INIS)

    Greenhouse, N.A. Jr.

    1980-01-01

    Recent assessments of potential radiation exposure pathways at Bikini and Enewetak have indicated that doses in excess of current radiation protection guidelines are possible or even likely for persons living in these areas. Rongelap and Utirik Atolls, which were downwind of the 1954 BRAVO event, also received significant fallout; potential radiological problems exist in these areas as well. In view of this prospect, followup environmental monitoring and personnel monitoring programs are being established to maintain our cognizance of radiological conditions, and to take corrective action where necessary. Various aspects of this program require the operation of scientific equipment in remote areas which have no electrical power. In order to solve this problem, windpowered electrical generators were installed on three islands in a planned program through which they will be turned over to the local inhabitants for community use after about two years. This paper describes environmental surveillance efforts for the inhabitants of Pacific Islands who were the recipients of radioactive fallout from US nuclear weapons tests in the Pacific

  19. Co-ordinated research and environmental surveillance programme related to sea disposal of radioactive waste

    International Nuclear Information System (INIS)

    1996-01-01

    The co-ordinated Research and Environmental Surveillance Programme relevant to sea disposal of radioactive waste (CRESP) was created in 1981 in the framework of the 1977 Decision of the OECD Council establishing a Multilateral Consultation and Surveillance Mechanism for Sea Dumping of Radioactive Waste. CRESP was essentially a scientific research programme. Its main objective was to increase the knowledge of processes controlling the transfer of radionuclides in the marine environment, so that safety assessments could be based on more accurate and comprehensive scientific data. From 1986, in response to a request from the Paris Commission, CRESP also considered the scientific aspects of coastal releases. CRESP made it possible to co-ordinate national research activities and generated an important international co-operation in its areas of work. The vast amount of scientific information gathered in this framework increased strongly our knowledge of the impact of radionuclides introduced to the deep sea environment. In particular, CRESP provided the basis for a comprehensive safety analysis of sea dumping operations. This study, published by the NEA in 1985, is still e reference on the subject. In November 1993, the Sixteenth Consultative Meeting of Contracting Parties to the London Convention 1972 voted a total ban on the disposal at sea of radioactive wastes and other radioactive matter. Considering this decision, the conclusions of the 1985 safety analysis, and CRESP's view that new scientific findings are unlikely to alter these conclusions, the NEA Steering Committee for nuclear Energy decided in October 1995 to terminate the programme. The present report summarises the knowledge accumulated within CRESP over its fifteen years of existence. (author)

  20. NEA Research and Environmental Surveillance Programme related to sea disposal of low-level radioactive waste

    International Nuclear Information System (INIS)

    Ruegger, B.; Templeton, W.L.; Gurbutt, P.

    1983-05-01

    Sea dumping operations of certain types of packaged low and medium-level radioactive wastes have been carried out since 1967 in the North-East Atlantic under the auspices of the OECD Nuclear Energy Agency. On the occasion of the 1980 review of the continued suitability of the North-East Atlantic site used for the disposal of radioactive waste, it was recommended that an effort should be made to increase the scientific data base relating to the oceanographic and biological characteristics of the dumping area. In particular, it was suggested that a site specific model of the transfer of radionuclides in the marine environment be developed, which would permit a better assessment of the potential radiation doses to man from the dumping of radioactive waste. To fulfill these objectives a research and environmental surveillance programme related to sea disposal of radioactive waste was set up in 1981 with the participation of thirteen Member countries and the International Laboratory for Marine Radioactivity of the IAEA in Monaco. The research program is focused on five research areas which are directly relevant to the preparation of more site-specific assessments in the future. They are: model development; physical oceanography; geochemistry; biology; and radiological surveillance. Promising results have already been obtained and more are anticipated in the not too distant future. An interim description of the NEA dumping site has been prepared which provides an excellent data base for this area (NEA 1983).It includes data in bathymetry, isopycnal topography, local and larger scale currents, sediment distribution and sedimentary processes, hydrochemistry, deep ocean biology and results of radiochemical analyses of sea water, sediments and biological materials. The modelling work is also well advanced allowing comparison of results obtained from different codes. After integration of the models, sensitivity analyses will provide indications for future research needs

  1. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  2. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  3. Surveillance and Critical Theory

    Directory of Open Access Journals (Sweden)

    Christian Fuchs

    2015-09-01

    Full Text Available In this comment, the author reflects on surveillance from a critical theory approach, his involvement in surveillance research and projects, and the status of the study of surveillance. The comment ascertains a lack of critical thinking about surveillance, questions the existence of something called “surveillance studies” as opposed to a critical theory of society, and reflects on issues such as Edward Snowden’s revelations, and Foucault and Marx in the context of surveillance.

  4. Fernald Environmental Management Project 1995 site environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  5. 2003 Idaho National Engineering and Environmental Laboratory Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-05-23

    Annual Illness and Injury Surveillance Program report for 2003 for Idaho National Lab. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  6. Environmental Report Utah State Prison Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-03-01

    This environmental report assesses the potential impact of developing a geothermal resource for space heating at the Utah State Prison. Wells will be drilled on prison property for production and for injection to minimize reservoir depletion and provide for convenient disposal of cooled fluid. The most significant environmental concerns are the proper handling of drilling muds during well drilling and the disposal of produced water during well testing. These problems will be handled by following currently accepted practices to reduce the potential risks.

  7. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  8. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects, National Research Council

    2007-01-01

    .... Although the use of wind energy to generate electricity is increasing rapidly in the United States, government guidance to help communities and developers evaluate and plan proposed wind-energy projects is lacking...

  9. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  10. Italian network for obesity and cardiovascular disease surveillance: A pilot project

    Directory of Open Access Journals (Sweden)

    Palmieri Luigi

    2008-09-01

    Full Text Available Abstract Background Also in Mediterranean countries, which are considered a low risk population for cardiovascular disease (CVD, the increase in body mass index (BMI has become a public health priority. To evaluate the feasibility of a CVD and obesity surveillance network, forty General Practitioners (GPs were engaged to perform a screening to assess obesity, cardiovascular risk, lifestyle habits and medication use. Methods A total of 1,046 women and 1,044 men aged 35–74 years were randomly selected from GPs' lists stratifying by age decade and gender. Anthropometric and blood pressure measurements were performed by GPs using standardized methodologies. BMI was computed and categorized in normal weight (BMI 18.5–24.9 kg/m2, overweight (BMI 25.0–29.9 kg/m2 and obese (BMI ≥ 30 kg/m2. Food frequency (per day: fruits and vegetables; per week: meat, cheese, fish, pulses, chocolate, fried food, sweet, wholemeal food, rotisserie food and sugar drink and physical activity (at work and during leisure time were investigated through a questionnaire. CVD risk was assessed using the Italian CUORE Project risk function. Results The percentage of missing values was very low. Prevalence of overweight was 34% in women and 50% in men; prevalence of obesity was 23% in both men and women. Level of physical activity was mostly low or very low. BMI was inversely associated with consumption of pulses, rotisserie food, chocolate, sweets and physical activity during leisure time and directly associated with consumption of meat. Mean value of total cardiovascular risk was 4% in women and 11% in men. One percent of women and 16% of men were at high cardiovascular risk (≥ 20% in 10 years. Normal weight persons were four times more likely to be at low risk than obese persons. Conclusion This study demonstrated the feasibility of a surveillance network of GPs in Italy focusing on obesity and other CVD risk factors. It also provided information on lifestyle habits

  11. Overview of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Ikenberry, T.A.

    1992-04-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that specific and representative individuals and populations may have received as a result of releases of radioactive materials from historical operations at the Hanford Site. These dose estimates would account for the uncertainties of information regarding facilities operations, environmental monitoring, demography, food consumption and lifestyles, and the variability of natural phenomena. Other objectives of the HEDR Project include: supporting the Hanford Thyroid Disease Study (HTDS), declassifying Hanford-generated information and making it available to the public, performing high-quality, credible science, and conducting the project in an open, public forum. The project is briefly described

  12. Beverley project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-07-01

    The Beverley deposit is located on the northern Lake Frome Plains, South Australia, 520km north of Adelaide. It is proposed to mine the deposit by in-situ leaching and to process the solution on the surface to produce an estimated 11,600t of yellowcake from about 6 million tonnes of 0.27% ore over approximately 23 years. The draft environmental impact statement is intended to cover all stages of the development from the pilot plant to final rehabilitation. Sections include the existing environment (geology, climate and meteorology, soils, hydrology, ecology, radionuclide base levels, land use, population and sites of Aboriginal and archaeological significance), the proposed development (solution mining, waste management, water management and mining and processing options), rehabilitation, environmental impact and environmental management and monitoring

  13. Jabiluka project - Draft Environmental Impact Statement. Appendices

    International Nuclear Information System (INIS)

    1996-01-01

    The Appendices provide various technical data in support of studies presented in the Main Report, including the guidelines for an EIS at Jabiluka, environmental requirements, waste management plan, water management system criteria, water quality data, transport licensing and security procedures, rehabilitation plus specialist studies into ore characteristics, noise issues and haulage risk assessment. Copyright (1996) Energy Resources of Australia Limited

  14. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  15. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  16. An overview of the Environmental Response Team's air surveillance procedures at emergency response activities

    Energy Technology Data Exchange (ETDEWEB)

    Turpin, R.D.; Campagna, P.R. (U.S. Environmental Protection Agency, Edison, NJ (USA))

    The Safety and Air Surveillance Section of the United States Environmental Protection Agency's Environmental Response Team responds to emergency air releases such as tire fires and explosions. The air surveillance equipment and procedures used by the organization are described, and case studies demonstrating the various emergency response activities are presented. Air response activities include emergency air responses, occupational and human health air responses and remedial air responses. Monitoring and sampling equipment includes photoionization detectors, combustible gas meters, real-time aerosol monitors, personal sampling pumps, and high flow pumps. Case histories presented include disposal of dioxane from a cotton plant, response to oil well fires in Kuwait, disposal of high pressure cylinders in American Samoa, and response to hurricane Hugo. 3 refs., 1 tab.

  17. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  18. The Narssaq-project - a geochemical, ecological environmental research project

    International Nuclear Information System (INIS)

    Soerensen, H.; Rose-Hansen, J.

    1978-01-01

    Two types of mineral occurrences near the town of Narssaq in South Greenland are recorded to be worth mining in the near future: the uranium occurrences at Kvanefjeld in the northern part of the Ilimaussaq intrusion and the zirconium occurrences in the southern part on the south coast of the Kangerdluarssuk fjord. Consideration of the environment plays a large part in discussions regarding the exploitation of these minerals. A report is given of the geochemical, ecological environmental investigations carried out at Narssaq since 1974. (BP)

  19. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  20. SIHTI 2. Energy and environmental technology. Yearbook 1995. Project presentations

    International Nuclear Information System (INIS)

    Korhonen, M.; Thun, R.

    1997-01-01

    Detrimental impacts of various energy production forms, their prevention and costs to enterprises and to the society are studied in the National Research Programme on Energy and Environmental Technology - SIHTI 2. For this evaluation work databases on Finland's energy production, fuels and boilers and emissions of various production forms are needed. This is one of the main subtasks of the SIHTI Programme. Development of methods and tools required for environmental decision making and for the assessment of environmental costs and testing of their usability and reliability are equally important. Emission measurements are a problem field that continuously sets new challenges. In addition to energy production and its environmental impacts, environmental issues of the woodprocessing industries form another important research field of SIHTI 2 programme. A common aim of both fields is to reduce emissions of detrimental substances, to recycle raw materials, and to minimise and reuse wastes. Research and development projects are being carried out by a number of universities of different fields of science and technology, by research organisations and enterprises, and many projects are realised in close co-operation. In 1995, the programme comprised 28 R and D projects by universities and 22 enterprise-led projects. Results of these projects are presented in this yearbook. Part of the research projects continued from the preceding year and part were new projects continuing in 1996

  1. Surveillance Plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-12-01

    This Surveillance Plan has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model The baseline monitoring phase is expected to begin in 1994 and continue for 12--18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC The routine annual monitoring phase will continue for ∼4 years after completion of the baseline monitoring phase. This Surveillance Plan presents the technical and quality assurance surveillance activities for the various WAG 6 environmental monitoring and data evaluation plans and implementing procedures

  2. Geothermal environmental projects publication list with abstracts 1975-1978

    Energy Technology Data Exchange (ETDEWEB)

    Ricker, Y.E.; Anspaugh, L.R.

    1979-05-15

    This report contains 119 abstracts of publication resulting from or closely related to geothermal environmental projects conducted by the Environmental Sciences Division at Lawrence Livermore Laboratory. Publications are listed chronologically from 1975 through 1978. The main entries are numbered sequentially, and include the full citation, an abstract, and selected keywords. This section is followed by an author index, and a keyword index.

  3. EVMS Self-Surveillance of Remote Handled Low Level Waste (RHLLW) Project

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Michael L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Case, Kimberly [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hergesheimer, Linda [Idaho National Lab. (INL), Idaho Falls, ID (United States); Johnson, Maxine [Idaho National Lab. (INL), Idaho Falls, ID (United States); Parker, Doug [Idaho National Lab. (INL), Idaho Falls, ID (United States); Staten, Rick [Idaho National Lab. (INL), Idaho Falls, ID (United States); Taylor, Scott [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-07-01

    DOE G 413.3-10A, Section 3.a states: “The Contractor has primary responsibility for implementing and maintaining a surveillance program to ensure continued compliance of the system with ANSI/EIA-748B. DOE O 413.3B requires the FPD to ensure the contractor conducts a Self-Surveillance annually. This annual Self-Surveillance,…should cover all 32 guidelines of the ANSI/EIA748B. Documentation of the Self-Surveillance is sent to the CO and the PMSO (copy to OECM) confirming the continued compliance of their EVMS ANSI/EIA748B...” This review, and the associated report, is deemed to satisfy this requirement.

  4. Olympic Dam project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-10-01

    The Olympic Dam deposit, South Australia, is estimated to contain at least 2,000 million tonnes of mineralized material, with an average grade of about 1.6% copper, 0.6 Kg/t of uranium oxide and 0.6 g/t of gold. The objective of the project is to extract and process the ore for the production and sale of copper, uranium oxide and the associated gold and silver. Facilities required are an underground mine, an on-site processing plant, associated facilities including a tailings retention system, a town to accommodate up to 9,000 people and other infrastructure. Chapters in the draft E.I.S. contain information on the environment, land use, aboriginal environment, geology, tailings retention system, radiation assessment, project infrastructure, social effects and economic effects

  5. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  6. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  7. The Project-Based Learning Approach in Environmental Education

    Science.gov (United States)

    Genc, Murat

    2015-01-01

    The purpose of this study is to investigate the effect of project-based learning on students' attitudes toward the environment. In the study that was performed with 39 students who take the "Environmental Education" course, attitude changes toward the environment were investigated in students who developed projects on environmental…

  8. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  9. Domestic environmental requirements, new and projected

    Energy Technology Data Exchange (ETDEWEB)

    McLean, B.J. [Environmental Protection Agency, Washington, DC (United States)

    1997-12-31

    The paper outlines and/or gives data on the following: environmental concerns; goal of Title IV; national SO{sub 2} emissions; reductions in wet sulfate deposition; SO{sub 2} allowance program--benefits and costs; utility NO{sub x} emissions; NO{sub x} compliance options; cost effectiveness of NO{sub x} control; electric power regulations timeline; Clean Air power initiative; what a new approach would look like; and an analysis of NO{sub x} and SO{sub 2} cap and trade scenarios.

  10. Environmental concerns drive project planning and design

    International Nuclear Information System (INIS)

    Hamilton, G.M.

    1994-01-01

    This paper describes the measures used to retrofit and requalify a Northwest Pipeline Corp., pipeline near Seattle, Washington. The pipeline is a 26 inch transmission line which has lost operating pressure because of the growth in Seattle's population. The pipeline was redesigned to requalify to a maximum pressure of 809 pounds per square inch. The paper describes the environmental issues faced during the construction and reconstruction efforts to protect wetlands and dispose of pipeline wastes. It describes the methods for cleaning the inside of the pipelines using various chemicals and cleaning tools

  11. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  12. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  13. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  14. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  15. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  16. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  17. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  18. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  19. Environmental Radiation Surveillance Results from over the Last Decade of Operational Experience at the Regional Radiation Monitoring Stations(RRMS)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hae Young [Daegu Regional Radiation Monitoring Station, Daegu (Korea, Republic of); Yoo, Dong Han [Ulsan Regional Radiation Monitoring Station, Ulsan (Korea, Republic of); Lee, Sang Hoon [Kyungpook National University, Daegu (Korea, Republic of)

    2015-10-15

    The objectives of the current program are to monitor environmental radiation/radioactivity level in Korea and to provide the base-line data on environmental radiation/radioactivity which will be useful in the case of radiological emergency situations. This program plays an important role in the view of protecting the public health against the potential hazards of radiation and maintaining a clean environment. This paper describes an introduction to the Regional Radiation Monitoring Stations (RRMS), and also presents some results of recent years (2001-2014). The environmental radiation surveillance results of years 2001-2014 have been described. It indicates normal levels of radiation in the past years. These kinds of studies are very important in providing references in understanding the environmental radioactivity level in a particular region.

  20. Yakima Fisheries Project. Final environmental impact statement

    International Nuclear Information System (INIS)

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (open-quotes adaptive managementclose quotes); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery

  1. Yakima Fisheries Project : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  2. The use of animals as a surveillance tool for monitoring environmental health hazards, human health hazards and bioterrorism.

    Science.gov (United States)

    Neo, Jacqueline Pei Shan; Tan, Boon Huan

    2017-05-01

    This review discusses the utilization of wild or domestic animals as surveillance tools for monitoring naturally occurring environmental and human health hazards. Besides providing early warning to natural hazards, animals can also provide early warning to societal hazards like bioterrorism. Animals are ideal surveillance tools to humans because they share the same environment as humans and spend more time outdoors than humans, increasing their exposure risk. Furthermore, the biologically compressed lifespans of some animals may allow them to develop clinical signs more rapidly after exposure to specific pathogens. Animals are an excellent channel for monitoring novel and known pathogens with outbreak potential given that more than 60 % of emerging infectious diseases in humans originate as zoonoses. This review attempts to highlight animal illnesses, deaths, biomarkers or sentinel events, to remind human and veterinary public health programs that animal health can be used to discover, monitor or predict environmental health hazards, human health hazards, or bioterrorism. Lastly, we hope that this review will encourage the implementation of animals as a surveillance tool by clinicians, veterinarians, ecosystem health professionals, researchers and governments. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  3. State partnership in environmental health and safety phase of Plowshare projects

    Energy Technology Data Exchange (ETDEWEB)

    Kinsman, S [California State Department of Public Health, Berkeley, CA (United States)

    1969-07-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  4. State partnership in environmental health and safety phase of Plowshare projects

    International Nuclear Information System (INIS)

    Kinsman, S.

    1969-01-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  5. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  6. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  7. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  8. A model of the environmental impacts of hydropower projects

    International Nuclear Information System (INIS)

    Kemppainen, T.; Haemaelaeinen, I.

    1992-01-01

    The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects

  9. Environmentally compliant manufacturing. Project accomplishment summary

    International Nuclear Information System (INIS)

    Morris, T.O.

    1997-01-01

    The metal working industry needs to reduce the waste associated with scrap, worn tools, degradation of metal working fluids, and etc. One task in this project concerned metal working fluids (MWF), which typically consists of surfactants, anti-microbial agents, lubricating agents, complexing agents, and a number of other components. The waste stream volume from the MWF can be reduced by judiciously (1) recycling, (2) selective replacement of expended components, and (3) protecting against microbial contamination. This activity consists of developing an analytical method, amenable to automation, which addresses all three of the methods of extending the MWF lifetime, thereby reducing the waste stream. The technology for determining key components in MWF on-line (at the machine tool) did not exist. The Y-12 Plant's collaboration was selected for this particular endeavor because of its ongoing machining operations and expertise in automation. In addition, concerns have been raised regarding chronic exposure of machine shop personnel to metal working fluid mists generated during routine machining operations. The chemical composition of metal working fluids is fairly well known, however, the chemical and physical characteristics of the resulting aerosols (mists) are not as well known. Machinists exposed to these aerosols by inhalation and skin contact sometimes develop unpleasant reactions. The second task involved efforts to characterize mists generated from candidate cutting fluids

  10. Sweetwater Uranium Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-12-01

    The proposed action is the issuance of a Source Material License to Minerals Exploration Company for the construction and operation of the proposed Sweetwater Uranium Mill with a nominal capacity of 3000 tons (2.7 x 10 6 kg) per day of uranium ore in Wyoming. The applicant proposes also to construct a heap-leaching and resin ion-exchange facility to extract uranium from low-grade ores and mine water. Impacts to the area due to the operation of the Sweetwater Uranium Mine/Mill Project will result in: Alternations of up to 2200 acres by the mill, mine pit area, and roads, and about 3450 acres of Battle Spring Flat to be inundated by mine dewatering operations; increase in the existing background radiation levels; socioeconomic effects on Rawlins and other nearby areas; and tailings from the mill will be produced at a rate of about 3000 tons (2.7 x 10 6 kg) per day and will be stored onsite in a lined impoundment. Conditions for the issuance of the license are given

  11. Laboratory-based respiratory virus surveillance pilot project on select cruise ships in Alaska, 2013-15.

    Science.gov (United States)

    Rogers, Kimberly B; Roohi, Shahrokh; Uyeki, Timothy M; Montgomery, David; Parker, Jayme; Fowler, Nisha H; Xu, Xiyan; Ingram, Deandra J; Fearey, Donna; Williams, Steve M; Tarling, Grant; Brown, Clive M; Cohen, Nicole J

    2017-09-01

    Influenza outbreaks can occur among passengers and crews during the Alaska summertime cruise season. Ill travellers represent a potential source for introduction of novel or antigenically drifted influenza virus strains to the United States. From May to September 2013-2015, the Alaska Division of Public Health, the Centers for Disease Control and Prevention (CDC), and two cruise lines implemented a laboratory-based public health surveillance project to detect influenza and other respiratory viruses among ill crew members and passengers on select cruise ships in Alaska. Cruise ship medical staff collected 2-3 nasopharyngeal swab specimens per week from passengers and crew members presenting to the ship infirmary with acute respiratory illness (ARI). Specimens were tested for respiratory viruses at the Alaska State Virology Laboratory (ASVL); a subset of specimens positive for influenza virus were sent to CDC for further antigenic characterization. Of 410 nasopharyngeal specimens, 83% tested positive for at least one respiratory virus; 71% tested positive for influenza A or B virus. Antigenic characterization of pilot project specimens identified strains matching predominant circulating seasonal influenza virus strains, which were included in the northern or southern hemisphere influenza vaccines during those years. Results were relatively consistent across age groups, recent travel history, and influenza vaccination status. Onset dates of illness relative to date of boarding differed between northbound (occurring later in the voyage) and southbound (occurring within the first days of the voyage) cruises. The high yield of positive results indicated that influenza was common among passengers and crews sampled with ARI. This finding reinforces the need to bolster influenza prevention and control activities on cruise ships. Laboratory-based influenza surveillance on cruise ships may augment inland influenza surveillance and inform control activities. However, these

  12. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  13. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  14. Removing a barrier to computer-based outbreak and disease surveillance--the RODS Open Source Project.

    Science.gov (United States)

    Espino, Jeremy U; Wagner, M; Szczepaniak, C; Tsui, F C; Su, H; Olszewski, R; Liu, Z; Chapman, W; Zeng, X; Ma, L; Lu, Z; Dara, J

    2004-09-24

    Computer-based outbreak and disease surveillance requires high-quality software that is well-supported and affordable. Developing software in an open-source framework, which entails free distribution and use of software and continuous, community-based software development, can produce software with such characteristics, and can do so rapidly. The objective of the Real-Time Outbreak and Disease Surveillance (RODS) Open Source Project is to accelerate the deployment of computer-based outbreak and disease surveillance systems by writing software and catalyzing the formation of a community of users, developers, consultants, and scientists who support its use. The University of Pittsburgh seeded the Open Source Project by releasing the RODS software under the GNU General Public License. An infrastructure was created, consisting of a website, mailing lists for developers and users, designated software developers, and shared code-development tools. These resources are intended to encourage growth of the Open Source Project community. Progress is measured by assessing website usage, number of software downloads, number of inquiries, number of system deployments, and number of new features or modules added to the code base. During September--November 2003, users generated 5,370 page views of the project website, 59 software downloads, 20 inquiries, one new deployment, and addition of four features. Thus far, health departments and companies have been more interested in using the software as is than in customizing or developing new features. The RODS laboratory anticipates that after initial installation has been completed, health departments and companies will begin to customize the software and contribute their enhancements to the public code base.

  15. Overview of environmental surveillance and compliance at Los Alamos during 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    After introductory remarks about the National Lab, the report discusses background radiation, human-produced radiation, radionuclide migration, doses, and health physics risk; the environmental programs at LANL including environmental protection, restoration, waste management, quality assurance, environmental oversight, environmental safety and training; environmental monitoring of external penetrating radiation, surface waters, sediments, soils, foodstuffs, and associated biota; and environmental compliance with existing regulations.

  16. Overview of environmental surveillance and compliance at Los Alamos during 1996

    International Nuclear Information System (INIS)

    1997-09-01

    After introductory remarks about the National Lab, the report discusses background radiation, human-produced radiation, radionuclide migration, doses, and health physics risk; the environmental programs at LANL including environmental protection, restoration, waste management, quality assurance, environmental oversight, environmental safety and training; environmental monitoring of external penetrating radiation, surface waters, sediments, soils, foodstuffs, and associated biota; and environmental compliance with existing regulations

  17. The insertion of the environmental health surveillance in the unified health system - 10.5020/18061230.2012.p3

    Directory of Open Access Journals (Sweden)

    Edenilo Baltazar Barreira Filho

    2012-03-01

    Full Text Available The integration of environmental monitoring activities in the Unified Health System (SUS shows some characteristics that differentiate it from the practice of epidemiological surveillance. This occurs mainly because much data on exposure to environmental factors is obtained outside the health sector and the adoption of actions that seek to control and/or prevent requires, in most cases, an intra andintersectoral understanding and articulation, since the health sector is not able, by itself, to provide answers to environmental health issues.In recent years, there has been an increasingly consolidation of the field of environmental health, which includes the area of public health, accustomed to scientific knowledge, to the formulation of public policies and the corresponding interventions (actions related to the interaction between human health and both natural and anthropic environmental factors, which determine, modulate and influence such interaction, in order to improve the quality of human life from the point of view of sustainability(1.As agreed at the Ist Seminar of the National Environmental Health, held in October 2005 and consolidated in the first National Conference on Environmental Health, held in December 2009, it is understood as an area of intersectoral and interdisciplinarypractice focused on the outcomes, in human health, of ecogeossocialrelations between man and environment(1.Accordingly, the Ministry of Health has been implementing, throughout the country, a Surveillance System in Environmental Health (SINVISA, seeking the improvement of this “model” of activities, establishing expertise into the three levels of government, aiming to consolidate the practice of Environmental Health within the SUS.Normative Instruction No. 1, March 7, 2005, creates SINVISA, establishes the area of action, the scope of the three levels of management within SUS and defines the Environmental Health Surveillance as a set of actions and services

  18. The insertion of the environmental health surveillance in the unified health system - 10.5020/18061230.2012.p1

    Directory of Open Access Journals (Sweden)

    Edenilo Baltazar Barreira Filho

    2012-03-01

    Full Text Available The integration of environmental monitoring activities in the Unified Health System (SUS shows some characteristics that differentiate it from the practice of epidemiological surveillance. This occurs mainly because much data on exposure to environmental factors is obtained outside the health sector and the adoption of actions that seek to control and/or prevent requires, in most cases, an intra andintersectoral understanding and articulation, since the health sector is not able, by itself, to provide answers to environmental health issues.In recent years, there has been an increasingly consolidation of the field of environmental health, which includes the area of public health, accustomed to scientific knowledge, to the formulation of public policies and the corresponding interventions (actions related to the interaction between human health and both natural and anthropic environmental factors, which determine, modulate and influence such interaction, in order to improve the quality of human life from the point of view of sustainability(1.As agreed at the Ist Seminar of the National Environmental Health, held in October 2005 and consolidated in the first National Conference on Environmental Health, held in December 2009, it is understood as an area of intersectoral and interdisciplinarypractice focused on the outcomes, in human health, of ecogeossocialrelations between man and environment(1.Accordingly, the Ministry of Health has been implementing, throughout the country, a Surveillance System in Environmental Health (SINVISA, seeking the improvement of this “model” of activities, establishing expertise into the three levels of government, aiming to consolidate the practice of Environmental Health within the SUS.Normative Instruction No. 1, March 7, 2005, creates SINVISA, establishes the area of action, the scope of the three levels of management within SUS and defines the Environmental Health Surveillance as a set of actions and services

  19. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  20. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  1. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  2. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  3. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  4. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  5. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program

  6. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  7. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  8. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    International Nuclear Information System (INIS)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989

  9. Child Maltreatment Surveillance Improvement Opportunities: A Wake County, North Carolina Pilot Project.

    Science.gov (United States)

    Shanahan, Meghan E; Fliss, Mike D; Proescholdbell, Scott K

    2018-01-01

    BACKGROUND As child maltreatment often occurs in private, child welfare numbers underestimate its true prevalence. Child maltreatment surveillance systems have been used to ascertain more accurate counts of children who experience maltreatment. This manuscript describes the results from a pilot child maltreatment surveillance system in Wake County, North Carolina. METHODS We linked 2010 and 2011 data from 3 sources (Child Protective Services, Raleigh Police Department, and Office of the Chief Medical Examiner) to obtain rates of definite and possible child maltreatment. We separately analyzed emergency department visits from 2010 and 2011 to obtain counts of definite and possible child maltreatment. We then compared the results from the surveillance systems to those obtained from Child Protective Services (CPS) data alone. RESULTS In 2010 and 2011, rates of definite child maltreatment were 11.7 and 11.3 per 1,000 children, respectively, when using the linked data, compared to 10.0 and 9.5 per 1,000 children using CPS data alone. The rates of possible maltreatment were 25.3 and 23.8 per 1,000, respectively. In the 2010 and 2011 emergency department data, there were 68 visits and 84 visits, respectively, that met the case definition for maltreatment. LIMITATIONS While 4 data sources were analyzed, only 3 were linked in the current surveillance system. It is likely that we would have identified more cases of maltreatment had more sources been included. CONCLUSION While the surveillance system identified more children who met the case definition of maltreatment than CPS data alone, the rates of definite child maltreatment were not considerably higher than official reports. Rates of possible child maltreatment were much higher than both the definite case definition and child welfare records. Tracking both definite and possible case definitions and using a variety of data sources provides a more complete picture of child maltreatment in North Carolina. ©2018 by the

  10. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  11. The Effect of Environmental Science Projects on Students' Environmental Knowledge and Science Attitudes

    Science.gov (United States)

    Al-Balushi, Sulaiman M.; Al-Aamri, Shamsa S.

    2014-01-01

    The current study explores the effectiveness of involving students in environmental science projects for their environmental knowledge and attitudes towards science. The study design is a quasi-experimental pre-post control group design. The sample was 62 11th-grade female students studying at a public school in Oman. The sample was divided into…

  12. Environmental impact assessment for the Nova projects (Building 391 complex)

    International Nuclear Information System (INIS)

    Odell, B.N.

    1979-01-01

    The environmental impact assessment of the Nova projects (Building 391 Complex) describes (1) the proposed actions, (2) the existing environment in and around the Livermore Valley, and (3) the potential environmental impacts from the construction and operation of these facilities. It shows that the proposed action does not conflict with any Federal, State, Regional, or Local Plans and Programs. Possible alternatives to the proposed action are discussed. However, it is concluded that the proposed actions were the most reasonable of the alternatives and would involve relatively minor adverse environmental impacts

  13. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  14. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  15. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  16. The Florida Ranchlands Environmental Services Project: Field Testing a Pay-for-Environmental-Services Program

    OpenAIRE

    Lynch, S.; Shabman, L.

    2007-01-01

    The Florida Ranchlands Environmental Services Project (FRESP) was recently launched, which will field test a program to complement the existing restoration programs such as the Lake Okeechobee Protection Plan (LOPP), which uses public funding to build treatment wetlands, drill aquifer storage, and capture rainwater (to delay its arrival downstream). FRESP will pay cattle ranchers to provide environmental services that will benefit the lake. PES-1 (Payments for Environmental Services Associ...

  17. Legionella spp. and legionellosis in southeastern Italy: disease epidemiology and environmental surveillance in community and health care facilities

    Directory of Open Access Journals (Sweden)

    Barbuti Giovanna

    2010-11-01

    Full Text Available Abstract Background Following the publication of the Italian Guidelines for the control and prevention of legionellosis an environmental and clinical surveillance has been carried out in Southeastern Italy. The aim of the study is to identify the risk factors for the disease, so allowing better programming of the necessary prevention measures. Methods During the period January 2000 - December 2009 the environmental surveillance was carried out by water sampling of 129 health care facilities (73 public and 56 private hospitals and 533 buildings within the community (63 private apartments, 305 hotels, 19 offices, 4 churches, 116 gyms, 3 swimming pools and 23 schools. Water sampling and microbiological analysis were carried out following the Italian Guidelines. From January 2005, all facilities were subject to risk analysis through the use of a standardized report; the results were classified as good (G, medium (M and bad (B. As well, all the clinical surveillance forms for legionellosis, which must be compiled by physicians and sent to the Regional Centre for Epidemiology (OER, were analyzed. Results Legionella spp. was found in 102 (79.1% health care facilities and in 238 (44.7% community buildings. The percentages for the contamination levels 10,000 cfu/L were respectively 33.1%, 53.4% and 13.5% for samples from health care facilities and 33.5%, 43.3% and 23.2% for samples from the community. Both in hospital and community environments, Legionella pneumophila serogroup (L. pn sg 2-14 was the most frequently isolate (respectively 54.8% and 40.8% of positive samples, followed by L. pn sg 1 (respectively 31.3% and 33%. The study showed a significant association between M or B score at the risk analysis and Legionella spp. positive microbiological test results (p Conclusions Our experience suggests that risk analysis and environmental microbiological surveillance should be carried out more frequently to control the environmental spread of Legionella

  18. Environmental impact assessment of Kachchh tidal power project

    International Nuclear Information System (INIS)

    Yadav, Ramanand; Lal, B.B.

    1995-01-01

    The Kachchh tidal power development project is a single-basin, single -effect and ebb generation development by construction of a tidal power barrage of about 3.25 km length across Hansthal creek. The project may disturb the ecosystem of the region. The paper deals in detail the environmental impacts of the project on climate, water velocity, flow and sedimentation pattern, water quality, flora and fauna, fishery, tourism and recreation, wild life, public health and socio-economic conditions. (author). 4 refs., 1 fig., 2 tabs

  19. Surveillance Angels

    NARCIS (Netherlands)

    Rothkrantz, L.J.M.

    2014-01-01

    The use of sensor networks has been proposed for military surveillance and environmental monitoring applications. Those systems are composed of a heterogeneous set of sensors to observe the environment. In centralised systems the observed data will be conveyed to the control room to process the

  20. Wuskwatim generation project : Canadian Environmental Assessment Act comprehensive study report

    International Nuclear Information System (INIS)

    2005-10-01

    This study report described the plan by Manitoba Hydro and the Nisichawayasihk Cree Nation (NCN) to construct a new 200- megawatt (MW) generating station at Taskinigup Falls on the Burntwood River, near the outlet of Wuskwatim Lake. This hydroelectric power project will allow Manitoba Hydro to meet its projected energy needs within the next two decades as identified in its 2002/03 Power Resource Plan. It will also allow Manitoba Hydro and NCN to obtain additional export revenues and profits by advancing the in-service date of the Project from 2020 to 2009. A formal environmental assessment is required under the Canadian Environmental Assessment Act (CEAA) because Fisheries and Oceans Canada (DFO) has determined that the Project would cause fish habitat losses requiring an authorization under the Fisheries Act. Many of the structures to be built in navigable waters would also require formal approval under the Navigable Waters Protection Act (NWPA), which has prompted this application of the CEAA. This environmental assessment report has been prepared by DFO in consultation with Transport Canada and other federal authorities concerned. It provides a summary of the Wuskwatim Generation Project and the environment in which it will be built and operated. In addition, the results of public consultations are discussed. It presents an assessment of the Project's influence on fish and fish habitat, birds, species at risk, human health (local air quality, quality of drinking water and consumption of fishery products), navigation, use of renewable resources, and current use of lands and resources for traditional purposes by Aboriginal persons (hunting, trapping, gathering, subsistence fishing and heritage sites). It was concluded that the proposed Project, as defined by the scope of the study, is not likely to cause significant adverse environmental effects. 45 refs., 5 tabs., 13 figs., 3 appendices

  1. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    International Nuclear Information System (INIS)

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclear Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1

  2. Development and piloting of the Fiji Injury Surveillance in Hospitals System (TRIP Project-1).

    Science.gov (United States)

    Wainiqolo, I; Kafoa, B; McCaig, E; Kool, B; McIntyre, R; Ameratunga, S

    2013-01-01

    Whilst more than 90% of injury related deaths are estimated to occur in low-and-middle-income countries (LMICs), the epidemiology of fatal and hospitalised injuries in Pacific Island Countries has received scant attention. This study describes the development and piloting of a population-based trauma registry in Fiji to address this gap in knowledge. The Fiji Injury Surveillance in Hospitals (FISH) system was an active surveillance system designed to identify injuries resulting in death or a hospital admission in Viti Levu, Fiji. During the pilot conducted over five months in 2005, Accident and Emergency registers, admission folders and morgue registers from 8 of Viti Levu's 12 hospitals, and an additional 3 hospitals in other parts of the country were reviewed by hospital staff and medical students to identify cases and extract a minimum data set that included demographic factors; the mechanism, nature and context of injury; substance use; and discharge outcomes. The system was audited to identify and redress difficulties with data quality in a manner that also supported local capacity development and training in injury surveillance and data management. This pilot study demonstrated the potential to collect high quality data on injuries that can pose a significant threat to life in Fiji using a mechanism that also increased the capability of health professionals to recognise the significance of injury as a public health issue. The injury surveillance system piloted provides the opportunity to inform national injury control strategies in Fiji and increase the capacity for injury prevention and more focused research addressing risk factors in the local context. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  4. Intentional and unintentional poisoning in Pakistan: a pilot study using the Emergency Departments surveillance project.

    Science.gov (United States)

    Khan, Nadeem; Pérez-Núñez, Ricardo; Shamim, Nudrat; Khan, Uzma; Naseer, Naureen; Feroze, Asher; Razzak, Junaid; Hyder, Adnan A

    2015-01-01

    Acute poisoning is one of the most common reasons for emergency department visits around the world. In Pakistan, the epidemiological data on poisoning is limited due to an under developed poison information surveillance system. We aim to describe the characteristics associated with intentional and unintentional poisoning in Pakistan presenting to emergency departments. The data was extracted from the Pakistan National Emergency Department Surveillance (Pak-NEDS) which was an active surveillance conducted between November 2010 and March 2011. All patients, regardless of age, who presented with poisoning to any of Pakistan's seven major tertiary care centers' emergency departments, were included. Information about patient demographics, type of poisoning agent, reason for poisoning and outcomes were collected using a standard questionnaire. Acute poisoning contributed to 1.2% (n = 233) of patients with intentional and unintentional injuries presenting to EDs of participating centers. Of these, 68% were male, 54% were aged 19 to 44 and 19% were children and adolescents (<18 years). Types of poisoning included chemical/gas (43.8%), drug/medicine (27%), alcohol (16.7%) and food/plant (6%). In half of all patients the poisoning was intentional. A total of 11.6% of the patients were admitted and 6.6% died. Poisoning causes more morbidity and mortality in young adults in Pakistan compared to other age groups, half of which is intentional. Improving mental health, regulatory control for hazardous chemicals and better access to care through poison information centers and emergency departments will potentially help control the problem.

  5. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  6. Environmental education project 'Mico-Estrela Track'

    Energy Technology Data Exchange (ETDEWEB)

    Vicente, Ana Paula Camargo de; Magalhaes, Milton Pinto Magalhaes; Silva, Simone Rodrigues da; Pinheiro, Roberta Vieira Nunes; Torres, Carlos Alberto Rodrigues; Silveira, Jeanete [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Senador Canedo fuel storage terminal is situated in the Cerrado biome and implements the policy of promoting improvements in the preservation of its Green Belt by working out the Environmental Education Project 'Mico-Estrela7 Track', aimed at stimulating the preservation, protection, landscape beauty and defense of scientific sources of the Cerrado through environmental sensibilization and rational use of the existing natural resources. In the area of the track (1.5 ha) alone 352 plants have been identified, totaling 97 different species that are distributed in 36 families. The implementation of the project will contribute to strengthen the relations with the local community, like dwellers, teachers and pupils of the municipal network of Senador Canedo, as well as co-workers of the unit, thus reaffirming the commitment of the company to socio-environmental responsibility. (author)

  7. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  8. Environmental assessment for the National Conversion Pilot Project, Stage 3

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of the National Conversion Pilot Project (NCPP) is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities. Economic conversion is the conversion of facilities and equipment owned by the Federal government to production of goods by private firms for profit. The NCPP mission is consistent with the RFETS current mission: to conduct site remediation, decontaminate and decommission site buildings and close the site in a manner that is safe, environmentally and socially responsible, physically secure, and cost effective. The NCPP is divided into three stages, with decision points at the ends of Stages 1 and 2 and periodically during Stage 3, to help ensure careful consideration of project effectiveness and to create an opportunity for regulators and stakeholders to provide comments to the DOE. At the end of each stage, the project can be reversed, authorized to proceed, or terminated

  9. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1996-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  10. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1997-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  11. China's Efforts on Management, Surveillance, and Research of Noncommunicable Diseases: NCD Scorecard Project.

    Science.gov (United States)

    Zhu, Xiao-Lei; Luo, Jie-Si; Zhang, Xiao-Chang; Zhai, Yi; Wu, Jing

    The incidence of noncommunicable diseases (NCDs) is rising dramatically throughout the world. Aspects of researches concerned with the improvement and development of prevention and control of NCDs have been conducted. Furthermore, the influence of most determinants of the major NCDs has showed that a broad and deep response involving stakeholders in different sectors is required in the prevention and control of NCDs. China has experienced an increase in NCDs in a short period compared with many countries. To address the burden of NCDs in China, it is important to learn about the progress that has been made in prevention and control of NCDs in China and worldwide, informed by opinions of stakeholders in different areas. In 2014, GRAND South developed the NCD Scorecard instrument to evaluate progress of NCD prevention and control in 23 countries through a 2-round Delphi process. The scorecard included 51 indicators in 4 domains: governance, surveillance and research, prevention and risk factors, and health system response. Stakeholders were then selected in the areas of government, nongovernmental organizations, private sectors, and academia to join the NCD Scorecard survey. Indicators of progress were scored by stakeholders from 0 (no activity), 1 (present but not adequate), and 2 (adequate) to 3 (highly adequate) and then the percentage of progress in each domain was calculated, representing the current situation in each country. There were 14 indicators in the domains of governance and surveillance and research. Of 429 stakeholders worldwide, 41 in China participated in the survey. China scored in the top 5 out of all participating countries in those 2 domains, scoring 67% in governance and 64% in surveillance and research. Indicators on which China scored particularly well included having a well-resourced unit or department responsible for NCDs, having a strong national system for recording the cause of all deaths, and having a system of NCD surveillance. Areas

  12. Annual summary report on the surveillance and maintenance activities for the Oak Rige National Laboratory Environmental Restoration Program for fiscal year 1995

    International Nuclear Information System (INIS)

    1995-11-01

    This Annual Summary Report on the Surveillance and Maintenance Activities for the Oak Ridge National Laboratory Environmental Restoration Program for Fiscal Year 1995 was prepared to communicate the accomplishments of the Program during fiscal year 1995. This work was performed under work breakdown structure element 1.4.12.6.1.14.20 (activity data sheet 3314, ''Remedial Action Surveillance and Maintenance''). Publication of this document meets the Life Cycle Baseline milestone date of November 30, 1995. This document provides the accomplishments for both the Remedial Action and Decontamination and Decommissioning Surveillance and Maintenance programs

  13. Evaluation 2000 and regulation and method. Release monitoring and environmental surveillance around Cea centers

    International Nuclear Information System (INIS)

    2001-06-01

    This publication counts for the year 2000 for the evaluation of liquid and gaseous radioactive effluents releases and the radioactivity levels measured in the vicinity of Cea centers, through the air, water, vegetation and milk surveillance. An analysis of the results from 1996 to 2000 allows to follow their evolution. A second booklet develops the sampling and measurement methods made on effluents in environment. It present besides the regulation applied to effluents monitoring. (N.C.)

  14. Crowdsourcing, citizen sensing and Sensor Web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples

    LENUS (Irish Health Repository)

    Kamel Boulos, Maged N

    2011-12-21

    Abstract \\'Wikification of GIS by the masses\\' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild\\'s term \\'Volunteered Geographic Information\\'. Six years later (2005-2011), OpenStreetMap and Google Earth (GE) are now full-fledged, crowdsourced \\'Wikipedias of the Earth\\' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional) models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and \\'human-in-the-loop sensing\\' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis\\/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, "noise", misinformation, bias and trust), the core technologies and Open Geospatial Consortium (OGC) standards involved (Sensor Web Enablement and Open GeoSMS), as well as a few outstanding project implementation examples from around the world.

  15. Crowdsourcing, citizen sensing and sensor web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples

    Science.gov (United States)

    2011-01-01

    'Wikification of GIS by the masses' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild's term 'Volunteered Geographic Information'. Six years later (2005-2011), OpenStreetMap and Google Earth (GE) are now full-fledged, crowdsourced 'Wikipedias of the Earth' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional) models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and 'human-in-the-loop sensing' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, "noise", misinformation, bias and trust), the core technologies and Open Geospatial Consortium (OGC) standards involved (Sensor Web Enablement and Open GeoSMS), as well as a few outstanding project implementation examples from around the world. PMID:22188675

  16. Crowdsourcing, citizen sensing and sensor web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples

    Directory of Open Access Journals (Sweden)

    Kamel Boulos Maged N

    2011-12-01

    Full Text Available Abstract 'Wikification of GIS by the masses' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild's term 'Volunteered Geographic Information'. Six years later (2005-2011, OpenStreetMap and Google Earth (GE are now full-fledged, crowdsourced 'Wikipedias of the Earth' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and 'human-in-the-loop sensing' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, "noise", misinformation, bias and trust, the core technologies and Open Geospatial Consortium (OGC standards involved (Sensor Web Enablement and Open GeoSMS, as well as a few outstanding project implementation examples from around the world.

  17. Crowdsourcing, citizen sensing and sensor web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples.

    Science.gov (United States)

    Kamel Boulos, Maged N; Resch, Bernd; Crowley, David N; Breslin, John G; Sohn, Gunho; Burtner, Russ; Pike, William A; Jezierski, Eduardo; Chuang, Kuo-Yu Slayer

    2011-12-21

    'Wikification of GIS by the masses' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild's term 'Volunteered Geographic Information'. Six years later (2005-2011), OpenStreetMap and Google Earth (GE) are now full-fledged, crowdsourced 'Wikipedias of the Earth' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional) models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and 'human-in-the-loop sensing' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, "noise", misinformation, bias and trust), the core technologies and Open Geospatial Consortium (OGC) standards involved (Sensor Web Enablement and Open GeoSMS), as well as a few outstanding project implementation examples from around the world.

  18. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Science.gov (United States)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  19. Status report : Terra Nova project environmental assessment panel : recommendations

    International Nuclear Information System (INIS)

    2002-01-01

    An application to the Canada-Newfoundland Offshore Petroleum Board (CNOPB) was submitted by Petro-Canada on August 5, 1996, notifying of its intent to develop the petroleum resources located at the Terra Nova field. The provincial and federal governments jointly appointed the Terra Nova Project Environmental Panel, and the board of the CNOPB referred to it the application documents for review. The environmental effects, considerations of human safety incorporated into the design and operation of the Project, the general approach to the development and exploitation of the petroleum resources, and the employment and industrial benefits expected to be derived from the Project were the issues under review by the Panel. On April 22, 1997, public hearings into the review began, and the final report was submitted to governments and the Board in August 1997. The report included 75 recommendations. The Project was approved in Decision 97.02 in December 1997, and the Board dealt with each of the recommendations. The respective positions of the Governments of Canada and Newfoundland and Labrador with regard to the recommendations that fell outside the jurisdiction of the Board were made public. A status report on every one of the 75 recommendations is provided in the present report. The recommendation is repeated, the verbatim response taken from Decision 97.02 included, followed by the status of the response. The production operations phase of the Project accounts for approximately 65 per cent of the recommendations. January 20, 2002 was the date the Project was begun

  20. Radiological safety and environmental surveillance during the mining and milling of beach minerals and processing of monazite

    International Nuclear Information System (INIS)

    Pillai, P.M.B.; Khan, A.H.

    2003-01-01

    This paper highlights the occupational and environmental radiological safety aspects and surveillance activities associated with mining and milling of beach minerals and processing of monazite, based on the experience gained over more than three decades of operations of the plants of Indian Rare Earths Ltd, at Chavara (Kerala), Manavalakurichi (Tamilnadu) and Udyogamandal (Kerala). The mining of beach sands, mineral separation and chemical processing of monazite for the recovery of Th and U involve occupational radiation hazards and safety problems of varying magnitudes. This part of the front end of the nuclear fuel cycle involves average per-capita occupational exposures ranging from 1.0 mSv to 8 mSv per year. The collective doses involved work out to 4.5 to 5.4 Person Sieverts per year and involve nearly 1000 radiation workers. Internal exposure contributes to nearly half of the exposure. Mechanization of the operations, process modifications, administrative controls and constant safety surveillance have over the years helped to reduce the exposures and to maintain them at levels as low as reasonably achievable (ALARA). Environmental releases resulting from the operations are well within the limits stipulated by competent authorities and exposures to public from the mining, mineral separation and monazite processing are not significant. (author)

  1. INEL Waste and Environmental Information Integration Project approach and concepts

    International Nuclear Information System (INIS)

    Dean, L.A.; Fairbourn, P.J.; Randall, V.C.; Riedesel, A.M.

    1994-06-01

    The Idaho National Engineering, Laboratory (INEL) Waste and Environmental Information integration Project (IWEIIP) was established in December 1993 to address issues related to INEL waste and environmental information including: Data quality; Data redundancy; Data accessibility; Data integration. This effort includes existing information, new development, and acquisition activities. Existing information may not be a database record; it may be an entire document (electronic, scanned, or hard-copy), a video clip, or a file cabinet of information. The IWEIIP will implement an effective integrated information framework to manage INEL waste and environmental information as an asset. This will improve data quality, resolve data redundancy, and increase data accessibility; therefore, providing more effective utilization of the dollars spent on waste and environmental information

  2. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  3. Data sharing report characterization of the surveillance and maintenance project miscellaneous process inventory waste items Oak Ridge National Laboratory, Oak Ridge, TN

    Energy Technology Data Exchange (ETDEWEB)

    Weaver, Phyllis C. [Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)—using the approved Waste Lot (WL) 108.1 profile—the Y-12 Sanitary Landfill (SLF) if appropriate; Energy

  4. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  5. Cincinnati, Ohio: Two environmental projects in danger of being misunderstood

    International Nuclear Information System (INIS)

    DeJong, K.A.

    1992-01-01

    The Mill Creek Flood Control and the Fernald Decontamination projects are major environmental issues in the (sub)urban setting of Cincinnati. Flood control of the Mill Creek, a tributary of the Ohio River that bisects Cincinnati, was initiated after a flood with $3 million damage in 1959. Its costs were originally estimated at $42 million (1970) and later at $106 million (1976); $110 million has now been spent and the total cost may reach $313 million in the year 2000 (1992 dollars). Benefit/cost ratios ranging between 2.6:1 and 1.6:1 were used to rationalize this project. Flood frequency of the Mill Creek will be discussed. Decontamination of the suburban Fernald site follows manufacturing of nuclear materials from 1953 until 1989. 149 tons of uranium and thorium wastes were released in the air, 83.5 tons to the Greater Miami River and 5,975 tons were placed in pits, all of which are leaking. The cost to cleanup up the local contamination may exceed $10 billion over a time period of 20--30 years, and the calculation of benefit/cost ratios is complex. The hydrology of the Fernald site will be examined. These two environmental projects are run respectively by the Army Corps of Engineers and the US Department of Energy through large industrial contractors. The projects are in danger of becoming like projects of the ''Military-Industrial Complex'' because of the public's ignorance or misinterpretation of the facts; the argument of public safety, and the huge costs. The role of geologists should include edification of the public about the geological aspects of environmental projects

  6. Decision management for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Roberds, W.J.; Haerer, H.A. [Golder Associates, Inc., Redmond, WA (United States); Winterfeldt, D.V. [Decision Insights, Laguna Beach, CA (United States)

    1992-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project is in the process of developing estimates for the radiation doses that individuals and population groups may have received as a result of past activities at the Hanford Reservation in Eastern Washington. A formal decision-aiding methodology has been developed to assist the HEDR Project in making significant and defensible decisions regarding how this study will be conducted. These decisions relate primarily to policy (e.g., the appropriate level of public participation in the study) and specific technical aspects (e.g., the appropriate domain and depth of the study), and may have significant consequences with respect to technical results, costs, and public acceptability.

  7. Decision management for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Roberds, W.J.; Haerer, H.A.; Winterfeldt, D.V.

    1992-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project is in the process of developing estimates for the radiation doses that individuals and population groups may have received as a result of past activities at the Hanford Reservation in Eastern Washington. A formal decision-aiding methodology has been developed to assist the HEDR Project in making significant and defensible decisions regarding how this study will be conducted. These decisions relate primarily to policy (e.g., the appropriate level of public participation in the study) and specific technical aspects (e.g., the appropriate domain and depth of the study), and may have significant consequences with respect to technical results, costs, and public acceptability

  8. Environmental agreements in Canada : Aboriginal participation, EIA follow-up and environmental management of major projects

    Energy Technology Data Exchange (ETDEWEB)

    O' Faircheallaigh, C. [Griffith Univ., Brisbane (Australia). Dept. of Politics and Public Policy

    2006-05-15

    Attempts are now being made to address the historic marginalization of indigenous peoples from the management of resource projects located on their ancestral lands through the use of environmental agreements. However, the rapid pace of resource development in certain regions of Canada has meant that there is an increased need to ensure effective follow-up procedures for Environmental Impact Assessment (EIA) processes in order to achieve meaningful Aboriginal participation in the management of large-scale resource projects. Lack of effective follow-up has made it difficult for the relevant agencies to manage risks and uncertainties. This book discussed the use of new policy environmental agreements between industry, government, and Aboriginal peoples. Case studies where environmental agreements were used in the Northwest Territories, Alberta, and Newfoundland were presented in order to demonstrate their efficacy. It was concluded that structures and processes must be designed to encourage Aboriginal participation in consultation processes. refs., tabs.

  9. Sheen surveillance: An environmental monitoring program subsequent to the 1989 Exxon Valdez shoreline cleanup

    International Nuclear Information System (INIS)

    Taft, D.G.; Egging, D.E.; Kuhn, H.A.

    1995-01-01

    In the fall of 1989, an aerial surveillance program was implemented to locate oil sheens (or slicks) originating from shorelines affected by the Exxon Valdez spill. The objectives of the program were to identify any oil on the water that warranted response and to identify those sections of shoreline that would be priority candidates for further cleanup in 1990. The program initially surveyed the entire affected area, but, because proportionally fewer sheens were spotted in the Gulf of Alaska, the program was refocused on Prince Williams Sound in early 1990. The surveillance program consisted of frequent low-altitude flights with trained observers in a deHavilland Twin otter outfitted with observation ports and communication equipment. The primary surveillance technique used was direct visual observation. Other techniques, including photography, were tested but proved less effective. The flights targeted all shorelines of concern, particularly those near fishing, subsistence, and recreational areas.the observers attempted to locate all sheens, estimate their size and color, ad identify the source of the oil found in the sheen. Size and color were used to estimate the volume of oil in each sheen. Samples were collected whenever possible during the summer of 1990 using a floating Teflon trademark sampling device that was developed for easy deployment from a boat or the pontoon of a float plane. Forty four samples were analyzed by UV-fluorescence spectroscopy. Eleven of these samples were also analyzed by GC/MS. In general, the analyses confirmed the observers' judgment of source. 16 refs., 9 figs., 2 tabs

  10. Health and Environment Linked for Information Exchange (HELIX)-Atlanta: A CDC-NASA Joint Environmental Public Health Tracking Collaborative Project

    Science.gov (United States)

    Al-Hamdan, Mohammad; Luvall, Jeff; Crosson, Bill; Estes, Maury; Limaye, Ashutosh; Quattrochi, Dale; Rickman, Doug

    2008-01-01

    HELIX-Atlanta was developed to support current and future state and local EPHT programs to implement data linking demonstration projects which could be part of the CDC EPHT Network. HELIX-Atlanta is a pilot linking project in Atlanta for CDC to learn about the challenges the states will encounter. NASA/MSFC and the CDC are partners in linking environmental and health data to enhance public health surveillance. The use of NASA technology creates value added geospatial products from existing environmental data sources to facilitate public health linkages. Proving the feasibility of the approach is the main objective

  11. Structural requirements of research tissue banks derived from standardized project surveillance.

    Science.gov (United States)

    Herpel, E; Koleganova, N; Schreiber, B; Walter, B; Kalle, C V; Schirmacher, P

    2012-07-01

    Tissue banks constitute decisive and rate-limiting resource and technology platforms for basic and translational biomedical research, notably in the area of cancer. Thus, it is essential to plan and structure tissue banking and allocate resources according to research needs, but essential requirements are still incompletely defined. The tissue bank of the National Center of Tumor Diseases Heidelberg (NCT) was founded with the intention to provide tissues of optimal quality and to prioritize the realization of research projects. We analysed its structure and prospective project management registration as well as tracking records for all projects of the NCT tissue bank as of its start in 2005 in order to obtain information that may be relevant for tissue bank planning. All project proposals submitted to the NCT tissue bank (n = 681) were included in the study. For a detailed evaluation of provided services, only projects that were completed until July 2011 (n = 605) were analysed. For these 605 projects, NCT tissue bank provided 769 specific services. In all projects/services, we recorded project leader, type and amount of material provided, type of research (basic/translational), work load of project and project completion. Furthermore, all completed projects were tracked after 90 days according to a standard protocol to determine principal investigators' (PI) satisfaction and quality of the provided material. Until July 2011, 605 projects had been successfully completed as documented by material transfer agreement. Of the projects, 72.7 % addressed basic research, 22.3 % were translational research projects and 3 % concerned epidemiological research; 91 % (n = 546) concerned a single PI and the NTC tissue bank. For these projects, 769 specific services were provided. Of these services, 288 concerned providing formalin-fixed and paraffin-embedded (FFPE) tissue (extracts, full size sections), 126 providing fresh frozen materials (including fresh frozen

  12. Modification of an environmental surveillance program to monitor PCDD/Fs and metals around a municipal solid waste incinerator.

    Science.gov (United States)

    Vilavert, Lolita; Nadal, Martí; Mari, Montse; Schuhmacher, Marta; Domingo, José L

    2009-11-01

    Since the mid-90s, an environmental surveillance program has been on-going to provide information on the levels of PCDD/Fs and various metals in soil and vegetation samples collected in the vicinity of a municipal solid waste incinerator (MSWI) in Tarragona (Catalonia, Spain). However, the presence of other potential sources of pollution in the zone, such as traffic, forest fires, local industries, etc., makes hard to determine the impact concerning the MSWI. Therefore, in 2007 a change in the monitoring program was implemented by collecting additional ambient air samples through active and passive sampling devices. Mean PCDD/F levels in herbage and soil were 0.10 ng I-TEQ/kg dry weight (range: 0.05-0.17 ng I-TEQ/kg dw) and 0.64 ng I-TEQ/kg dw (range: 0.13-2.41 ng I-TEQ/kg dw), respectively. A significant reduction of the PCDD/F concentration in both monitors was observed with respect to our previous surveys. Air mean concentrations of PCDD/Fs were 12.04 and 15.21 fg WHO-TEQ/m(3) in 2007 and 2008, respectively, meaning a non-significant increase of 26%. In addition, a generalized increase of environmental metal levels with respect to our baseline study was not observed. The current concentrations of PCDD/Fs and metals in the vicinity of the MSWI of Tarragona are relatively low in comparison with other areas under the influence of emissions from waste incinerators. This indicates that the environmental impact of the MSWI of Tarragona is not significant. Moreover, the modification of the surveillance program has proven to be successful.

  13. Environmental Audit of the Grand Junction Projects Office

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  14. Environmental Audit of the Grand Junction Projects Office

    International Nuclear Information System (INIS)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs

  15. Arabidopsis MADS-Box Transcription Factor AGL21 Acts as Environmental Surveillance of Seed Germination by Regulating ABI5 Expression.

    Science.gov (United States)

    Yu, Lin-Hui; Wu, Jie; Zhang, Zi-Sheng; Miao, Zi-Qing; Zhao, Ping-Xia; Wang, Zhen; Xiang, Cheng-Bin

    2017-06-05

    Seed germination is a crucial checkpoint for plant survival under unfavorable environmental conditions. Abscisic acid (ABA) signaling plays a vital role in integrating environmental information to regulate seed germination. It has been well known that MCM1/AGAMOUS/DEFICIENS/SRF (MADS)-box transcription factors are key regulators of seed and flower development in Arabidopsis. However, little is known about their functions in seed germination. Here we report that MADS-box transcription factor AGL21 is a negative regulator of seed germination and post-germination growth by controlling the expression of ABA-INSENSITIVE 5 (ABI5) in Arabidopsis. The AGL21-overexpressing plants were hypersensitive to ABA, salt, and osmotic stresses during seed germination and early post-germination growth, whereas agl21 mutants were less sensitive. We found that AGL21 positively regulated ABI5 expression in seeds. Consistently, genetic analyses showed that AGL21 is epistatic to ABI5 in controlling seed germination. Chromatin immunoprecipitation assays further demonstrated that AGL21 could directly bind to the ABI5 promoter in plant cells. Moreover, we found that AGL21 responded to multiple environmental stresses and plant hormones during seed germination. Taken together, our results suggest that AGL21 acts as a surveillance integrator that incorporates environmental cues and endogenous hormonal signals into ABA signaling to regulate seed germination and early post-germination growth. Copyright © 2017 The Author. Published by Elsevier Inc. All rights reserved.

  16. Environmental surveillance of the US Department of Energy Portsmouth Gaseous Diffusion Plant and surrounding environs during 1986: Volume 4

    International Nuclear Information System (INIS)

    Oakes, T.W.; Wiehle, W.E.; Valentine, B.L.

    1987-04-01

    This report provides monitoring data for the installation and surrounding environs that may have been affected by operations on the plant site; provides detailed information about the installation; provides detailed information on input and assumption used in all calculations; integrates monitoring data and related studies in one document to pull together, highlight, and summarize the information contained in many documents; provides trend analyses, where possible, to indicate increases and decreases in environmental conditions; and provides general information on the plant site and quality assurance. Routine monitoring and sampling for radiation, radioactive materials, and chemical substances on and off the DOE reservation and PORTS are used to document compliance with appropriate standards, identify trends, provide information for the public, and contribute to general environmental knowledge. The surveillance program assists in fulfilling the DOE policy of protecting the public, employees, and the environment from harm that could be caused by its activities and reducing negative environmental impacts to the greatest degree practicable. Environmental monitoring information complements data on specific releases, trends, and summaries. 68 refs., 203 figs., 112 tabs

  17. Environmental Impact Assessment of a Water Transfer Project

    Directory of Open Access Journals (Sweden)

    Pazoki

    2015-07-01

    Full Text Available Background Reliable water supplies for drinking and agriculture are some of the objectives for the sustainable development of every country. However, constructed facilities such as dams and irrigation networks and drainage can exert positive and negative effects directly or indirectly on the environment. The environmental impact assessment is a method for identifying the positive and negative effects caused by a plan and suggests performance management best practices aimed at lessening the negative impacts and augmenting the positive ones. Objectives The present study sought to evaluate the environmental impacts of the water transfer project of the Jooban Dam in two phases of preparation and operation. Materials and Methods A checklist containing the positive, negative, short-term, and long-term effects as well as the continuation and probable occurrence of these effects was used. Results The results showed that the negative environmental and social impacts of the project outweighed the positive impacts in terms of type, number, and intensity. Conclusions Unless there are well-thought out strategies for minimizing the undesirable impact on the environment, it is not advisable that such projects be permitted.

  18. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  19. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  20. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  1. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  2. Environmental management compliance reengineering project, FY 1997 report

    Energy Technology Data Exchange (ETDEWEB)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  3. Environmental monitoring annual report for the Tumulus Disposal Demonstration Project

    International Nuclear Information System (INIS)

    Yager, R.E.; Craig, P.M.

    1989-01-01

    The Fiscal Year 1988 Annual Report is the third in a series of semi-annual Tumulus Development Disposal Project data summary reports. The reporting schedule has been modified to correspond to the fiscal years and the subcontractor contract periods. This data summary spans the time from start of operations in June 1987 through the end of September 1988. The environmental data collected include run-off water quality and quantity, groundwater quality and levels, soil sampling and hydrometeorological data. This data is being used and analyzed here to demonstrate the environmental performance objectives for the TDDP as part of the overall performance assessment for the TDDP. Approximately one year of pre-operational data were collected prior to operations beginning on April 11, 1988. Comparisons are made between pre- and post-operational data. No significant environmental impacts have been found since operations have begun. 10 refs., 21 figs., 22 tabs

  4. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  5. Dietary supplement adverse events: report of a one-year poison center surveillance project.

    Science.gov (United States)

    Haller, Christine; Kearney, Tom; Bent, Stephen; Ko, Richard; Benowitz, Neal; Olson, Kent

    2008-06-01

    The safety and efficacy of dietary supplements is of growing concern to regulators, health-care providers and consumers. Few scientific data exist on clinical effects and potential toxicities of marketed products. Harmful supplements may not be identified for months or years with existing adverse event monitoring mechanisms. Retrospective review of poison center statistics to capture supplement-associated toxicity also has limitations. We collaborated with the FDA Center for Food Safety and Nutrition (CFSAN) to conduct a 1-year prospective surveillance study of dietary supplement-related poison control center calls in 2006. Prompt follow-up of symptomatic cases, laboratory analysis of implicated dietary supplements, and causality assessment by a case review expert panel were performed. Of 275 dietary supplements calls, 41% involved symptomatic exposures; and two-thirds were rated as probably or possibly related to supplement use. Eight adverse events required hospital admission. Sympathomimetic toxicity was most common, with caffeine products accounting for 47%, and yohimbe products accounting for 18% of supplement-related symptomatic cases. Suspected drug-herb interactions occurred in 6 cases, including yohimbe co-ingested with buproprion (1) and methamphetamine (3), and additive anticoagulant/antiplatelet effects of NSAIDs taken with fish oils (1) and ginkgo (1). Laboratory analysis identified a pharmacologically active substance in 4 cases; supplement toxicity was ruled unlikely when analytical testing was negative in 5 cases. Most supplement-related adverse events were minor. Clinically significant toxic effects were most frequently reported with caffeine and yohimbe-containing products. Active surveillance of poison control center reports of dietary supplement adverse events enables rapid detection of potentially harmful products, which may facilitate regulatory oversight.

  6. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  7. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  8. The NEA research and environmental surveillance programme related to sea disposal of low-level radioactive waste

    Science.gov (United States)

    Rugger, B.; Templeton, W. L.; Gurbutt, P.

    1983-05-01

    Sea dumping operations of certain types of packaged low and medium level radioactive wastes have been carried out since 1967 in the North-East Atlantic under the auspices of the OECD Nuclear Energy Agency. On the occasion of the 1980 review of the continued suitability of the North-East Atlantic site used for the disposal of radioactive waste, it was recommended that an effort should be made to increase the scientific data base relating to the oceanographic and biological characteristics of the dumping area. In particular, it was suggested that a site specific model of the transfer of radionuclides in the marine environment be developed, which would permit a better assessment of the potential radiation doses to man from the dumping of radioactive waste. To fulfill these objectives a research and environmental surveillance program related to sea disposal of radioactive waste was set up in 1981 with the participation of thirteen Member countries and the International Laboratory for Marine Radioactivity of the IAEA in Monaco. The research program is focused on five research areas which are directly relevant to the preparation of more site specific assessments in the future. They are: model development; physical oceanography; geochemistry; biology; and radiological surveillance. Promising results have already been obtained and more are anticipated in the not too distant future. An interim description of the NEA dumping site has been prepared which provides an excellent data base for this area.

  9. Communication tools for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Blazek, Mary Lou; Power, Max S.

    1992-01-01

    From 1944 to 1989, the U.S. Department of Energy produced plutonium at the Hanford Site in southeast Washington State. In the early days of operation, large amounts of radioactive materials were released to the environment. Documents about the releases were made public in 1986. The Hanford Environmental Dose Reconstruction Project began in 1987. The Project will determine how much radioactive material was released, how that material may have exposed people, and what radiation doses people may have received. The Project will be complete in 1995. The federal government pays for the work. The scientific work on the study is done by Battelle's Pacific Northwest Laboratory. Public credibility and valid science are equally important to those directing the dose reconstruction work. A number of tools are used to inform the public and encourage public participation. These tools are examined in this paper. (author)

  10. Soil and vegetation surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, E.J.

    1995-06-01

    Soil sampling and analysis evaluates long-term contamination trends and monitors environmental radionuclide inventories. This section of the 1994 Hanford Site Environmental Report summarizes the soil and vegetation surveillance programs which were conducted during 1994. Vegetation surveillance is conducted offsite to monitor atmospheric deposition of radioactive materials in areas not under cultivation and onsite at locations adjacent to potential sources of radioactivity.

  11. Epidemiological surveillance of informal workers' health in two cities in southeastern Brazil: the experience of the TRAPP-TRAPPURA projects.

    Science.gov (United States)

    Corrêa-Filho, Heleno Rodrigues; Cugliari, Luciana; Gaspar, Aidê A Coelho Dos Santos; Loureiro, José Fernando; Siqueira, Carlos Eduardo

    2010-01-01

    Informal labor markets have grown in peripheral countries, accounting for more than 50% of jobs. There is anecdotal evidence of a direct relation between informal sector growth and an increase in the frequency and severity of work-related diseases and injuries. Two sister pilot projects were conducted in Uberaba and Campinas, Brazil to develop population-based epidemiological surveillance of workplace injuries in the informal sector. Results for Campinas and Uberaba found cumulative yearly incidences of 5.1% and 10.4%, with incidence rates of 2.2 and 6.5 injuries per 100,000 worked hours, respectively. The proportions of lost work time were 0.3% and 0.31%. Rates found were comparable to those found in the literature for both formal and informal jobs. These results suggest that bad working conditions in the formal labor market are replicated in the informal market as subcontracting and outsourcing contribute to the growth of informal jobs.

  12. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Sanchez, Luis E.; Silva-Sanchez, Solange S.

    2008-01-01

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval

  13. Final report for SNL/NM environmental drilling project

    International Nuclear Information System (INIS)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of open-quotes cut/thrust and compact cuttings without adding large quantities of fluidclose quotes to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal

  14. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  15. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  16. A new code for spectrometric analysis for environmental radiological surveillance on monitors focused on gamma radioactivity on aerosols

    Energy Technology Data Exchange (ETDEWEB)

    De Blas, Alfredo; Tapia, Carlos; Riego, Albert; Garcia, Roger; Dies, Javier; Diaz, Pedro [Nuclear Engineering Research Group, Departament of Physics and Nuclear Engineering, Technical University of Catalonia, Barcelona (Spain); Toral, Juan [Raditel Serveis, Tarragona (Spain); Batalla, Enric [Radiological Activities Corrdination Service - SCAR, Generalitat de Catalunya. Barcelona (Spain)

    2015-07-01

    pGamma is a code developed by the NERG group of the Technical University of Catalonia - Barcelona Tech for the analysis of gamma spectra generated by the Equipment for the Continuous Measurement and Identification of Gamma Radioactivity on Aerosols with Paper Filter developed for our group and Raditel Servies company. Nowadays the code is in the process of adaptation for the monitors of the Environmental Radiological Surveillance Network of the Local Government of Catalonia (Generalitat of Catalonia), Spain. The code is a Spectrum Analysis System, it identifies the gamma emitters on the spectrum, determines its Concentration of Activity, generates alarms depending on the Activity of the emitters and generates a report. The Spectrum Analysis System includes a library with emitters of interest, NORM and artificial. The code is being used on the three stations with the aerosol monitor of the Network (Asco and Vandellos, near both Nuclear Power Plants and Barcelona). (authors)

  17. Environmental surveillance during an outbreak of tularaemia in hares, the Netherlands, 2015.

    Science.gov (United States)

    Janse, Ingmar; Maas, Miriam; Rijks, Jolianne M; Koene, Miriam; van der Plaats, Rozemarijn Qj; Engelsma, Marc; van der Tas, Peter; Braks, Marieta; Stroo, Arjan; Notermans, Daan W; de Vries, Maaike C; Reubsaet, Frans; Fanoy, Ewout; Swaan, Corien; Kik, Marja Jl; IJzer, Jooske; Jaarsma, Ryanne I; van Wieren, Sip; de Roda-Husman, Ana Maria; van Passel, Mark; Roest, Hendrik-Jan; van der Giessen, Joke

    2017-08-31

    Tularaemia, a disease caused by the bacterium Francisella tularensis, is a re-emerging zoonosis in the Netherlands. After sporadic human and hare cases occurred in the period 2011 to 2014, a cluster of F. tularensis-infected hares was recognised in a region in the north of the Netherlands from February to May 2015. No human cases were identified, including after active case finding. Presence of F. tularensis was investigated in potential reservoirs and transmission routes, including common voles, arthropod vectors and surface waters. F. tularensis was not detected in common voles, mosquito larvae or adults, tabanids or ticks. However, the bacterium was detected in water and sediment samples collected in a limited geographical area where infected hares had also been found. These results demonstrate that water monitoring could provide valuable information regarding F. tularensis spread and persistence, and should be used in addition to disease surveillance in wildlife. This article is copyright of The Authors, 2017.

  18. Interim report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-02-01

    Concern for the environment and cost reduction are the driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. Preliminary activities included surveying the directional drilling access needs of various DOE sites, identifying an existing class of machinery that could be enhanced for environmental work through development, and establishing a mutually beneficial working relationship with an industry partner. Since that time the project has tested a variety of prototype machinery and hardware built by the industrial partner, and SNL. The project continues to test and develop the machinery and technique refinements needed for future applications at DOE, DOD, and private sector sites. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of ``cut/thrust and compact cuttings without adding large quantities of fluid`` to an environmental problem site. Technology transfer to the private sector is ongoing and ultimately should result in commercial availability of the machinery. Education of regulatory agencies resulting in restructuring appropriate regulatory standards for specification of the horizontal drilling techniques will be a final project goal.

  19. Environmental impacts of dispersed development from federal infrastructure projects.

    Science.gov (United States)

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  20. Environmental Surveillance of Polioviruses in Rio de Janeiro, Brazil, in Support to the Activities of Global Polio Eradication Initiative.

    Science.gov (United States)

    de Oliveira Pereira, Joseane Simone; da Silva, Lidiane Rodrigues; de Meireles Nunes, Amanda; de Souza Oliveira, Silas; da Costa, Eliane Veiga; da Silva, Edson Elias

    2016-03-01

    Wild polioviruses still remain endemic in three countries (Afghanistan, Pakistan, and Nigeria) and re-emergency of wild polio has been reported in previously polio-free countries. Environmental surveillance has been used as a supplementary tool in monitoring the circulation of wild poliovirus (PVs) and/or vaccine-derived PVs even in the absence of acute flaccid paralysis cases. This study aimed to monitor the presence of polioviruses in wastewater samples collected at one wastewater treatment plant located in the municipality of Rio de Janeiro, Brazil. From December 2011 to June 2012 and from September to December 2012, 31 samples were collected and processed. RD and L20B cell cultures were able to isolate PVs and non-polio enteroviruses in 27/31 samples. Polioviruses were isolated in eight samples (type 1 Sabin = 1, type 2 Sabin = 5, and type 3 Sabin = 2). Vaccine-derived polioviruses were not detected nor evidence of recombination with other PVs or non-polio enterovirus serotypes were observed among the isolates. The Sabin-related serotypes 2 and 3 presented nucleotide substitutions in positions associated with the neurovirulent phenotype at the 5'-UTR. Changes in important Amino acid residues at VP1 were also observed in the serotypes 2 and 3. Environmental surveillance has been used successfully in monitoring the circulation of PVs and non-polio enteroviruses and it is of crucial importance in the final stages of the WHO global polio eradication initiative. Our results show the continuous circulation of Sabin-like PVs and non-polio enteroviruses in the analyzed area during the study period.

  1. Implementation of an integrated on-line process surveillance and diagnostic system at the Halden reactor project: MOAS

    International Nuclear Information System (INIS)

    Kim, I.S.; Grini, R.-E.; Nilsen, S.

    2001-01-01

    MOAS is an integrated on-line process surveillance and diagnostic system that uses several different models for knowledge acquisition and diagnostic reasoning, such as goal-tree success-tree model, process monitor trees, and sensor failure diagnosis trees. Within these models, the knowledge of the process and its operation, including deep knowledge, like mass balance or controller algorithm, is incorporated. During an extensive review, made as part of the integrated diagnosis system project of the Halden reactor project, MOAS (Maryland Operator Advisory System) was identified as one of the most thorough systems developed thus far. MOAS encompasses diverse functional aspects that are required for an effective process disturbance management: (1) intelligent process monitoring and alarming, (2) on-line sensor data validation and sensor failure diagnosis, (3) on-line hardware (besides sensors) failure diagnosis, and (4) real-time corrective measure synthesis. The MOAS methodology was used for the NORS (Nokia Research Simulator) process at the Halden man-machine laboratory HAMMLAB of the OECD Halden reactor project. The performance tests of MOAS, implemented in G2 real-time expert system shell, show that MOAS successfully carries out its intended functions, i.e. quickly recognizing an occurring disturbance, correctly diagnosing its cause, and presenting advice on its control to the operator. The lessons learned and insights gained during the implementation and performance tests also are discussed

  2. The optimized baseline project: Reinventing environmental restoration at Hanford

    International Nuclear Information System (INIS)

    Goodenough, J.D.; Janaskie, M.T.; Kleinen, P.J.

    1994-01-01

    The U.S. Department of Energy Richland Operations Office (DOE-RL) is using a strategic planning effort (termed the Optimized Baseline Project) to develop a new approach to the Hanford Environmental Restoration program. This effort seeks to achieve a quantum leap improvement in performance through results oriented prioritization of activities. This effort was conducted in parallel with the renegotiation of the Tri-Party Agreement and provided DOE with an opportunity to propose innovative initiatives to promote cost effectiveness, accelerate progress in the Hanford Environmental Restoration Program and involve stakeholders in the decision-making process. The Optimized Baseline project is an innovative approach to program planning and decision-making in several respects. First, the process is a top down, value driven effort that responds to values held by DOE, the regulatory community and the public. Second, planning is conducted in a way that reinforces the technical management process at Richland, involves the regulatory community in substantive decisions, and includes the public. Third, the Optimized Baseline Project is being conducted as part of a sitewide Hanford initiative to reinvent Government. The planning process used for the Optimized Baseline Project has many potential applications at other sites and in other programs where there is a need to build consensus among diverse, independent groups of stakeholders and decisionmakers. The project has successfully developed and demonstrated an innovative approach to program planning that accelerates the pace of cleanup, involves the regulators as partners with DOE in priority setting, and builds public understanding and support for the program through meaningful opportunities for involvement

  3. Environmental impact assessments of wind energy projects: An Alberta example

    International Nuclear Information System (INIS)

    Brown, W.K.

    1993-01-01

    A description is presented of the environmental impact assessment for an Alberta windfarm, summarizing the rationale, process and results of the assessment, costs involved, and recommendations made. The Pe-kun-nee windfarm was designed as a 44 turbine, 9.9 kW windfarm. The assessment included consideration of the complete range of environmental impacts of the windfarm, including reviews of impacts associated with similar developments elsewhere. From an environmental perspective, the proposed site and transmission line route were exceedingly suitable for development. No major potential impacts were identified. Most impacts that could occur, including terrain and vegetation disturbance, were associated with the construction phase of the project. A series of mitigation measures were developed to minimize each identified impact. Monitoring during the operations phase of the development was recommended to: ensure that the revegetation of disturbed areas was adequate; verify the sound level model; and document the incidence of bird strikes. Potential aesthetic impacts were addressed through a proposed interpretive project designed to educate visitors, enhance the profile of the wind-energy industry, and provide local employment. The assessment was completed within 8 months of initiation at a cost less than $200,000

  4. The Hanford Environmental Dose Reconstruction (HEDR) Project: Technical approach

    International Nuclear Information System (INIS)

    Napier, B.A.; Freshley, M.D.; Gilbert, R.O.; Haerer, H.A.; Morgan, L.G.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    Historical measurements and current assessment techniques are being combined to estimate potential radiation doses to people from radioactive releases to the air, the Columbia River, soils, and ground water at the Hanford Site since 1944. Environmental contamination from these releases has been monitored, at varying levels of detail, for 45 yr. Phase I of the Hanford Environmental Reconstruction Project will estimate the magnitude of potential doses, their areal extends, and their associated uncertainties. The Phase I study area comprises 10 counties in eastern Washington and northern Oregon, within a 100-mi radius of the site, including a stretch of the Columbia River that was most significantly affected. These counties contain a range of projected and measured contaminant levels, environmental exposure pathways, and population groups. Phase I dose estimates are being developed for the periods 1944 through 1947 for air pathways and 1964 through 1966 for river pathways. Important radionuclide/pathway combinations include fission products, such as 131 I, in milk for early atmospheric releases and activation products, such as 32 P and 65 Zn, in fish for releases to the river. Potential doses range over several orders of magnitude within the study area. We will expand the time periods and study are in three successive phases, as warranted by results of Phase I

  5. Some environmental impacts associated with project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    1976-01-01

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kiloton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. Based on overall results it appears important to give adequate attention to environmental effects resulting from nuclear fracturing experiments

  6. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  7. The International Adoption Project: population-based surveillance of Minnesota parents who adopted children internationally.

    Science.gov (United States)

    Hellerstedt, Wendy L; Madsen, Nikki J; Gunnar, Megan R; Grotevant, Harold D; Lee, Richard M; Johnson, Dana E

    2008-03-01

    To conduct the first population-based surveillance in the United States of parents who adopted children from countries outside of the United States. A 556-item survey was mailed to 2,977 parents who finalized an international adoption in Minnesota between January 1990 and December 1998; 1,834 (62%) parents returned a survey. Eighty-eight percent of the parents reported transracial adoptions (97% of the parents were white); 57% of the adopted children were Asian; 60% were female; and on average, the children were 18 months-old at the time of placement. Only 15% of the parents reported household annual incomes less than $50,000 and 71% reported they had college educations. Sixty-one percent traveled to their child's country of birth prior to the adoption. Almost three-quarters involved their children in experiences related to their birth countries and 98% would recommend international adoption. Three-quarters of the parents believe that parental leave was an issue for them as they adopted. This is the first population-based survey of U.S. parents who have adopted internationally. The adoptive parents were socioeconomically different than birth parents in Minnesota and their families are most likely to be transracial. Because international adoption has become more prevalent, it is important to understand the strengths and needs of families that are created through this unique form of migration.

  8. Radiological and environmental surveillance in front-end fuel cycle facilities

    International Nuclear Information System (INIS)

    Khan, A.H.; Sahoo, S.K.; Tripathi, R.M.

    2004-01-01

    This paper describes the occupational and environmental radiological safety measures associated with the operations of front end nuclear fuel cycle. Radiological monitoring in the facilities is important to ensure safe working environment, protection of workers against exposure to radiation and comply with regulatory limits of exposure. The radiation exposure of workers in different units of the front end nuclear fuels cycle facilities operated by IREL, UCIL and NFC and environmental monitoring results are summarised

  9. Nontuberculous Mycobacteria Isolation from Clinical and Environmental Samples in Iran: Twenty Years of Surveillance

    Directory of Open Access Journals (Sweden)

    Ali Akbar Velayati

    2015-01-01

    Full Text Available Nontuberculous mycobacteria (NTM are opportunistic pathogens that are widely distributed in the environment. There is a lack of data on species distribution of these organisms from Iran. This study consists of a review of NTM articles published in Iran between the years 1992 and 2014. In this review, 20 articles and 14 case reports were identified. Among the 20 articles, 13 (65% studies focused on NTM isolates from clinical specimens, 6 (30% studies examined NTM isolates from environmental samples, and one (5% article included both clinical and environmental isolates. M. fortuitum (229/997; 23% was recorded as the most prevalent and rapid growing mycobacteria (RGM species in both clinical (28% and environmental (19% isolated samples (P < 0.05. Among slow growing mycobacteria (SGM, M. simiae (103/494; 21% demonstrated a higher frequency in clinical samples whereas in environmental samples it was M. flavescens (44/503; 9%. These data represent information from 14 provinces out of 31 provinces of Iran. No information is available in current published data on clinical or environmental NTM from the remaining 17 provinces in Iran. These results emphasize the potential importance of NTM as well as the underestimation of NTM frequency in Iran. NTM is an important clinical problem associated with significant morbidity and mortality in Iran. Continued research is needed from both clinical and environmental sources to help clinicians and researchers better understand and address NTM treatment and prevention.

  10. Nontuberculous Mycobacteria Isolation from Clinical and Environmental Samples in Iran: Twenty Years of Surveillance.

    Science.gov (United States)

    Velayati, Ali Akbar; Farnia, Parissa; Mozafari, Mohadese; Mirsaeidi, Mehdi

    2015-01-01

    Nontuberculous mycobacteria (NTM) are opportunistic pathogens that are widely distributed in the environment. There is a lack of data on species distribution of these organisms from Iran. This study consists of a review of NTM articles published in Iran between the years 1992 and 2014. In this review, 20 articles and 14 case reports were identified. Among the 20 articles, 13 (65%) studies focused on NTM isolates from clinical specimens, 6 (30%) studies examined NTM isolates from environmental samples, and one (5%) article included both clinical and environmental isolates. M. fortuitum (229/997; 23%) was recorded as the most prevalent and rapid growing mycobacteria (RGM) species in both clinical (28%) and environmental (19%) isolated samples (P < 0.05). Among slow growing mycobacteria (SGM), M. simiae (103/494; 21%) demonstrated a higher frequency in clinical samples whereas in environmental samples it was M. flavescens (44/503; 9%). These data represent information from 14 provinces out of 31 provinces of Iran. No information is available in current published data on clinical or environmental NTM from the remaining 17 provinces in Iran. These results emphasize the potential importance of NTM as well as the underestimation of NTM frequency in Iran. NTM is an important clinical problem associated with significant morbidity and mortality in Iran. Continued research is needed from both clinical and environmental sources to help clinicians and researchers better understand and address NTM treatment and prevention.

  11. Rinderpest surveillance

    International Nuclear Information System (INIS)

    2003-01-01

    Rinderpest is probably the most lethal virus disease of cattle and buffalo and can destroy whole populations; damaging economies; undermining food security and ruining the livelihood of farmers and pastoralists. The disease can be eradicated by vaccination and control of livestock movement. The Department of Technical Co-operation is sponsoring a programme, with technical support from the Joint FAO/IAEA Division to provide advice, training and materials to thirteen states through the 'Support for Rinderpest Surveillance in West Asia' project. (IAEA)

  12. 78 FR 43183 - Notice of Availability for Sharpe Permit Relinquishment Project Environmental Assessment Finding...

    Science.gov (United States)

    2013-07-19

    ... for Sharpe Permit Relinquishment Project Environmental Assessment Finding of No Significant Impact... Relinquishment Project Environmental Assessment (EA) Finding of No Significant Impact (FONSI). SUMMARY: On April... environment. Human environment was interpreted comprehensively to include the natural and physical environment...

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  15. Environmental Project of I.E.S. Antoni Maura

    Science.gov (United States)

    Crespi Salom, Pere

    2010-05-01

    Environmental Project of I.E.S. Antoni Maura Author(s): Pere Crespí i Salom Teacher of Department of Biology and Geology and Environmental Coordinator (2009-2010) from I.E.S. Antoni Maura . Mallorca. Illes Balears. Spain Teachers participating in the project : Myriam Fuentes Milani, Olga Ballester Nebot, Antoni Salom Ruiz, Julio René Loayza Casanova, Puy Aguirre Rémirez, Yolanda Martínez Laserna, Jaume Puppo Lama, Carme Arrom , Dolors Aguiló Segura, Marga Ordinas Boter, Angel Fernàndez Albertí , Immaculada Suau López, Antònia Florit Torrandell, Isabel Mateu Arcos, Román Piña Valls i Pere Crespí Salom. Our institute takes part since 2004 in adapting environmentally the schools in the Balearics which consists of developing activities which aim is that both teachers and students acquire habits so as to apply to their ordinary lives though different participative commissions ( 10-15 teachers): 1st commission: recycling and reusing materials. Enough bins in the classrooms and floors: yellow for plastic, blue for paper, and green for the other. We tend to use recycled materials in different celebrations such as Carnival, Christmas, Saint Jordi and Environmental day. We also organise workshops for the teachers to develop afterwards with the students and nature of environmental exposures. 2nd commission: Scatter information ( MonMaura, Maurifull, Green window and website).Throughout different means we inform the teachers and students about all the school activities and where to consult.( www.iesantonimaura.net, Playful area , environmental project ). 3rd commission: Reusing text books.( there is a students service of borrowing books and giving them back at the end of the school year if the book is in good use.) 4th commission: Improving the school surroundings, the back garden and garden with native plants. Department of Biology and Geology is responsible for caring for an organic garden and in turn improve the center's garden with native plants within the

  16. Discussion on the post-project assessment of environmental impact for nuclear facilities

    International Nuclear Information System (INIS)

    Shang Zhaorong

    2013-01-01

    The paper introduces the background of post-project assessment of environmental impact in the world and focuses on the characteristic of environmental impact assessment for Chinese nuclear facilities construction projects, analyzes the necessity, principle and contents of post-project assessment of environmental impact on current Chinese nuclear facilities operation. It is considered that to start the post-project assessment of environmental impact, perfect the post-project assessment mechanism, introduce the post-project assessment into environmental impact assessment system are just at the night time. (author)

  17. Oconee Nuclear Station, Units 1, 2, and 3. Annual operating report for 1976, volume 1: nonradiological environmental surveillance report; II: summary of operations

    International Nuclear Information System (INIS)

    1977-01-01

    The non-radiological environmental surveillance program including thermal and chemical effluents, water quality, fish populations, benthos, fish impingement, gas-bubble disease, and plankton, fish larvae and fish egg entrainment is described. Information is also presented concerning operations, personnel radiation exposures, and fuel examinations

  18. Environmental assessment of the projected uses for geopressured waters

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, J.S.; Manning, J.A.; Meriwether, J.

    1977-11-16

    An assessment of possible environmental effects of the use of geopressured water of the Texas and Louisiana Gulf Coast has been made. The uses considered include generation of electric power, production of low pressure steam for process heat and the direct use of the hot water for space heating. Based upon the projected uses, the direct and indirect emissions are estimated and the impact of these emissions upon the environment are discussed. The possible impacts of the production of large volumes of geopressured fluids are also considered in terms of possibility of subsidence and earthquakes. A summary of available analyses of Gulf Coast deep waters is listed as a guide for estimating expected emissions. Primary environmental problems are identified as waste brine disposal, accidental releases of brines, and subsidence. Minor problems such as cooling tower blowdown streams, noncondensable gas emissions, wind drift from exhaust plumes, noise levels, and construction activities are considered.

  19. Environmental Assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-08-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  20. Draft environmental assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-06-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  1. An overview of the Environmental Monitoring Computer Automation Project

    International Nuclear Information System (INIS)

    Johnson, S.M.; Lorenz, R.

    1992-01-01

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS

  2. Development of the UMTRA Project Groundwater Environmental Impact Statement

    International Nuclear Information System (INIS)

    Burt, C.; Ulland, L.; Metzler, D.

    1993-01-01

    This paper discusses the development and preparation of the Programmatic Environmental Impact Statement (PEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Groundwater Restoration Project. The initiation of the scoping process and preparation of the PEIS began when the Notice of Intent (NOI) to prepare the PEIS was published in the Federal Register on November 18, 1992. However, planning for the PEIS began well before the publication of the NOI, with various aspects of the PEIS, such as the initial formulation of the alternatives and the format of the scoping process, being developed early on. During this preliminary planning phase, it became clear that the preparation of this PEIS posed some significant challenges while at the same time provided for significant opportunities. This paper will briefly summarize the UMTRA Project, discuss the major sections in the PEIS, and describe the challenges and opportunities that developed during the preparation of the PEIS

  3. Integration of models for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Napier, B.A.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals could have received as a result of emissions from nuclear operations at Hanford since 1944. The objective of phase 1 of the project was to demonstrate through calculations that adequate models and support data exist or could be developed to allow realistic estimations of doses to individuals from releases of radionuclides to the environment that occurred as long as 45 years ago. Much of the data used in phase 1 was preliminary; therefore, the doses calculated must be considered preliminary approximations. This paper describes the integration of various models that was implemented for initial computer calculations. Models were required for estimating the quantity of radioactive material released, for evaluating its transport through the environment, for estimating human exposure, and for evaluating resultant doses

  4. Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.

  5. Environmental information volume: Liquid Phase Methanol (LPMEOH trademark) project

    International Nuclear Information System (INIS)

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature

  6. The Rocky Flats Environmental Technology Site beryllium characterization project

    International Nuclear Information System (INIS)

    Morrell, D.M.; Miller, J.R.; Allen, D.F.

    1999-01-01

    A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found

  7. [Nuclear energy and environment: review of the IAEA environmental projects].

    Science.gov (United States)

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.

  8. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    International Nuclear Information System (INIS)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment

  9. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

  10. Complementing the surveillance law principles of the Court of Strasbourg with its environmental law principles. An integrated technology approach to a human rights framework for surveillance

    NARCIS (Netherlands)

    de Hert, P.J.A.; Galetta, Antonella

    2014-01-01

    If one looks at the case law of the European Court of Human Rights on surveillance matters, a well mature set of principles emerge, namely: legality, legitimacy, proportionality (the standard check) and, if the Court is "on it", also necessity and subsidiarity (the closer scrutiny check). We pass

  11. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  12. Machine Learning Technologies Translates Vigilant Surveillance Satellite Big Data into Predictive Alerts for Environmental Stressors

    Science.gov (United States)

    Johnson, S. P.; Rohrer, M. E.

    2017-12-01

    The application of scientific research pertaining to satellite imaging and data processing has facilitated the development of dynamic methodologies and tools that utilize nanosatellites and analytical platforms to address the increasing scope, scale, and intensity of emerging environmental threats to national security. While the use of remotely sensed data to monitor the environment at local and global scales is not a novel proposition, the application of advances in nanosatellites and analytical platforms are capable of overcoming the data availability and accessibility barriers that have historically impeded the timely detection, identification, and monitoring of these stressors. Commercial and university-based applications of these technologies were used to identify and evaluate their capacity as security-motivated environmental monitoring tools. Presently, nanosatellites can provide consumers with 1-meter resolution imaging, frequent revisits, and customizable tasking, allowing users to define an appropriate temporal scale for high resolution data collection that meets their operational needs. Analytical platforms are capable of ingesting increasingly large and diverse volumes of data, delivering complex analyses in the form of interpretation-ready data products and solutions. The synchronous advancement of these technologies creates the capability of analytical platforms to deliver interpretable products from persistently collected high-resolution data that meet varying temporal and geographic scale requirements. In terms of emerging environmental threats, these advances translate into customizable and flexible tools that can respond to and accommodate the evolving nature of environmental stressors. This presentation will demonstrate the capability of nanosatellites and analytical platforms to provide timely, relevant, and actionable information that enables environmental analysts and stakeholders to make informed decisions regarding the prevention

  13. Discussion on the method of environmental radiological impact assessment for the highway construction project

    International Nuclear Information System (INIS)

    Qiu Guohua

    2008-01-01

    Based on the characteristics and environmental radiological impact of the highway construction project, the basic procedure of environmental radiological impact assessment for the highway construction project is put forward, including analysis and determination of contamination sources, selection of evaluation factors, determination of assessment range and dose limit, environmental investigation, environmental impact prediction and assessment. The working method of each procedure is analyzed. (authors)

  14. A national surveillance project on chronic kidney disease management in Canadian primary care: a study protocol.

    Science.gov (United States)

    Bello, Aminu K; Ronksley, Paul E; Tangri, Navdeep; Singer, Alexander; Grill, Allan; Nitsch, Dorothea; Queenan, John A; Lindeman, Cliff; Soos, Boglarka; Freiheit, Elizabeth; Tuot, Delphine; Mangin, Dee; Drummond, Neil

    2017-08-04

    Effective chronic disease care is dependent on well-organised quality improvement (QI) strategies that monitor processes of care and outcomes for optimal care delivery. Although healthcare is provincially/territorially structured in Canada, there are national networks such as the Canadian Primary Care Sentinel Surveillance Network (CPCSSN) as important facilitators for national QI-based studies to improve chronic disease care. The goal of our study is to improve the understanding of how patients with chronic kidney disease (CKD) are managed in primary care and the variation across practices and provinces and territories to drive improvements in care delivery. The CPCSSN database contains anonymised health information from the electronic medical records for patients of participating primary care practices (PCPs) across Canada (n=1200). The dataset includes information on patient sociodemographics, medications, laboratory results and comorbidities. Leveraging validated algorithms, case definitions and guidelines will help define CKD and the related processes of care, and these enable us to: (1) determine prevalent CKD burden; (2) ascertain the current practice pattern on risk identification and management of CKD and (3) study variation in care indicators (eg, achievement of blood pressure and proteinuria targets) and referral pattern for specialist kidney care. The process of care outcomes will be stratified across patients' demographics as well as provider and regional (provincial/territorial) characteristics. The prevalence of CKD stages 3-5 will be presented as age-sex standardised prevalence estimates stratified by province and as weighted averages for population rates with 95% CIs using census data. For each PCP, age-sex standardised prevalence will be calculated and compared with expected standardised prevalence estimates. The process-based outcomes will be defined using established methods. The CPCSSN is committed to high ethical standards when dealing with

  15. Economic and environmental evaluation of investment projects of biogas plants

    International Nuclear Information System (INIS)

    Guzmán Marrero, Elizabeth; Guzmán Chinea, Jesús Manuel; Mata Varela, Milagros C.; Pérez González, Yanet

    2015-01-01

    The economic evaluation of the implementation and use of renewable energy is an issue of paramount importance and has been approached from different perspectives by different authors in different countries. Biogas technology has its own characteristics that make it more complex analysis involved not only in this case the energy aspect but there is also a significant impact on health assessment difficult, fertilization, soil improvement, animal feed and improved conditions of life. The capital budgeting, in conjunction with the planning process, is a key economic tool for decision making and in turn represents an ongoing challenge for the agricultural sector. It is a necessity of our country, together with the entire world, potentiate the action to correct management of organic waste generated in intensive pig farming, to contribute to the reduction of environmental impacts that this work causes. Studies in this area show the shortcomings that exist in Cuban law established for the evaluation of investment projects, both in its structure and in its cycle, without taking into account important elements such as risk analysis. This research evaluates the economic and financial feasibility of an investment project, including a social and environmental assessment of the same financial justification for the inclusion of risk analysis in the evaluation process (full text)

  16. Surveillance and characterisation of Cronobacter spp. in Czech retail food and environmental samples

    Czech Academy of Sciences Publication Activity Database

    Mozrová, Věra; Břeňová, Natalia; Mrázek, Jakub; Lukešová, D.; Marounek, Milan

    2014-01-01

    Roč. 59, č. 1 (2014), s. 63-68 ISSN 0015-5632 R&D Projects: GA ČR GAP503/10/0664 Institutional support: RVO:67985904 Keywords : Cronobacter spp. Subject RIV: EE - Microbiology, Virology Impact factor: 1.000, year: 2014

  17. Crowdsourcing, citizen sensing and Sensor Web technologies for public and environmental health surveillance and crisis management: trends, OGC standards and application examples

    Energy Technology Data Exchange (ETDEWEB)

    Kamel Boulos, Maged; Resch, Bernd; Crowley, David N.; Breslin, John G.; Sohn, Gunho; Burtner, Edwin R.; Pike, William A.; Jeziersk, Eduardo; Slayer Chuang, Kuo Yu

    2011-12-21

    The PIE Activity Awareness Environment is designed to be an adaptive data triage and decision support tool that allows role and activity based situation awareness through a dynamic, trainable filtering system. This paper discusses the process and methodology involved in the application as well as some of its capabilities. 'Wikification of GIS by the masses' is a phrase-term first coined by Kamel Boulos in 2005, two years earlier than Goodchild's term 'Volunteered Geographic Information'. Six years later (2005-2011), OpenStreetMap and Google Earth (GE) are now full-fledged, crowdsourced 'Wikipedias of the Earth' par excellence, with millions of users contributing their own layers to GE, attaching photos, videos, notes and even 3-D (three dimensional) models to locations in GE. From using Twitter in participatory sensing and bicycle-mounted sensors in pervasive environmental sensing, to creating a 100,000-sensor geo-mashup using Semantic Web technology, to the 3-D visualisation of indoor and outdoor surveillance data in real-time and the development of next-generation, collaborative natural user interfaces that will power the spatially-enabled public health and emergency situation rooms of the future, where sensor data and citizen reports can be triaged and acted upon in real-time by distributed teams of professionals, this paper offers a comprehensive state-of-the-art review of the overlapping domains of the Sensor Web, citizen sensing and 'human-in-the-loop sensing' in the era of the Mobile and Social Web, and the roles these domains can play in environmental and public health surveillance and crisis/disaster informatics. We provide an in-depth review of the key issues and trends in these areas, the challenges faced when reasoning and making decisions with real-time crowdsourced data (such as issues of information overload, 'noise', misinformation, bias and trust), the core technologies and Open Geospatial

  18. Optimised Environmental Test Approaches in the GOCE Project

    Science.gov (United States)

    Ancona, V.; Giordano, P.; Casagrande, C.

    2004-08-01

    The Gravity Field and Steady-State Ocean Circulation Explorer (GOCE) is dedicated to measuring the Earth's gravity field and modelling the geoid with extremely high accuracy and spatial resolution. It is the first Earth Explorer Core mission to be developed as part of ESA's Living Planet Programme and is scheduled for launch in 2006. The program is managed by a consortium of European companies: Alenia Spazio, the prime contractor, Astrium GmbH, the platform responsible, Alcatel Space Industries and Laben, suppliers of the main payloads, respectively the Electrostatic Gravity Gradiometer (EGG) and the Satellite to Satellite Tracking Instrument (SSTI), actually a precise GPS receiver. The GOCE Assembly Integration and Verification (AIV) approach is established and implemented in order to demonstrate to the customer that the satellite design meets the applicable requirements and to qualify and accept from lower level up to system level. The driving keywords of "low cost" and "short schedule" program, call for minimizing the development effort by utilizing off-the-shelf equipment combined with a model philosophy lowering the number of models to be used. The paper will deal on the peculiarities of the optimized environmental test approach in the GOCE project. In particular it introduces the logic of the AIV approach and describe the foreseen tests at system level within the SM environmental test campaign, outlining the Quasi Static test performed in the frame of the SM sine vibration tests, and the PFM environmental test campaign pinpointing the deletion of the Sine Vibration test on PFM model. Furthermore the paper highlights how the Model and Test Effectiveness Database (MATD) can be utilized for the prediction of the new space projects like GOCE Satellite.

  19. CNR LARA project, Italy: Airborne laboratory for environmental research

    Science.gov (United States)

    Bianchi, R.; Cavalli, R. M.; Fiumi, L.; Marino, C. M.; Pignatti, S.

    1995-01-01

    The increasing interest for the environmental problems and the study of the impact on the environment due to antropic activity produced an enhancement of remote sensing applications. The Italian National Research Council (CNR) established a new laboratory for airborne hyperspectral imaging, the LARA Project (Laboratorio Aero per Ricerche Ambientali - Airborne Laboratory for Environmental Research), equipping its airborne laboratory, a CASA-212, mainly with the Daedalus AA5000 MIVIS (Multispectral Infrared and Visible Imaging Spectrometer) instrument. MIVIS's channels, spectral bandwidths, and locations are chosen to meet the needs of scientific research for advanced applications of remote sensing data. MIVIS can make significant contributions to solving problems in many diverse areas such as geologic exploration, land use studies, mineralogy, agricultural crop studies, energy loss analysis, pollution assessment, volcanology, forest fire management and others. The broad spectral range and the many discrete narrow channels of MIVIS provide a fine quantization of spectral information that permits accurate definition of absorption features from a variety of materials, allowing the extraction of chemical and physical information of our environment. The availability of such a hyperspectral imager, that will operate mainly in the Mediterranean area, at the present represents a unique opportunity for those who are involved in environmental studies and land-management to collect systematically large-scale and high spectral-spatial resolution data of this part of the world. Nevertheless, MIVIS deployments will touch other parts of the world, where a major interest from the international scientific community is present.

  20. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    International Nuclear Information System (INIS)

    Williams, C.V.; Burford, T.D.

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy's (DOE's) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID's technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID

  1. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  2. Air surveillance

    International Nuclear Information System (INIS)

    Patton, G.W.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the air surveillance and monitoring programs currently in operation at that Hanford Site. Atmospheric releases of pollutants from Hanford to the surrounding region are a potential source of human exposure. For that reason, both radioactive and nonradioactive materials in air are monitored at a number of locations. The influence of Hanford emissions on local radionuclide concentrations was evaluated by comparing concentrations measured at distant locations within the region to concentrations measured at the Site perimeter. This section discusses sample collection, analytical methods, and the results of the Hanford air surveillance program. A complete listing of all analytical results summarized in this section is reported separately by Bisping (1995)

  3. Air surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Patton, G.W.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the air surveillance and monitoring programs currently in operation at that Hanford Site. Atmospheric releases of pollutants from Hanford to the surrounding region are a potential source of human exposure. For that reason, both radioactive and nonradioactive materials in air are monitored at a number of locations. The influence of Hanford emissions on local radionuclide concentrations was evaluated by comparing concentrations measured at distant locations within the region to concentrations measured at the Site perimeter. This section discusses sample collection, analytical methods, and the results of the Hanford air surveillance program. A complete listing of all analytical results summarized in this section is reported separately by Bisping (1995).

  4. Emerging various environmental threats to brain and overview of surveillance system with zebrafish model

    Directory of Open Access Journals (Sweden)

    Rafael Vargas

    Full Text Available Pathologies related to neurotoxicity represent an important percentage of the diseases that determine the global burden of diseases. Neurotoxicity may be related to the increasing levels of potentially neurotoxic agents that pollute the environment, which generates concern, since agents that affect children may increase the incidence of neurodevelopmental disorders, affecting the quality of life of future citizens. Many environmental contaminants have been detected, and many of them derive from several human activities, including the mining, agriculture, manufacturing, pharmaceutical, beverage and food industries. These problems are more acute in third world countries, where environmental regulations are lax or non-existent. An additional major emerging problem is drug contamination. Periodic monitoring should be performed to identify potential neurotoxic substances using biological tests capable of identifying the risk. In this sense the fish embryo test (FET, which is performed on zebrafish embryos, is a useful, reliable and economical alternative that can be implemented in developing countries. Keywords: Neurotoxicity, Global burden disease, Environmental contaminants, Zebrafish embryo test

  5. Preoperational radiation surveillance of the WIPP Project by EEG for the years 1993 - 1995

    Energy Technology Data Exchange (ETDEWEB)

    Kenney, J.W.; Gray, D.H.; Ballard, S.C. [Environmental Evaluation Group, Carlsbad, NM (United States)

    1998-03-01

    Average {sup 241}Am, {sup 239+240}Pu and {sup 238}Pu concentrations measured in ambient air near the Waste Isolation Pilot Plant (WIPP) site during 1993, 1994 and 1995 are consistent with similar data reported by the U.S. Environmental Protection Agency (EPA) and Los Alamos National Laboratory (LANL) for Espanola, Pojoaque and Santa Fe, New Mexico. Through the use of replicate analyses of matrix blanks minimum detectable activity (MDA), minimum detectable concentration (MDC) and action levels (ACTL) were established for the Environmental Evaluation Group (EEG) measurement system. Using MDA data from fixed air sampler (FAS) filters and conservative assumptions applied in the National Council on Radiation Protection and Measurements (NCRP) Report 123 (NCRP 1996), it is shown that the EEG sampling and measurement methodology is capable of detecting effluent air emissions which would produce a dose that is approximately 1000 times below the 40 CFR 191 Subpart A limit of 2.5E{sup -4} Sv/y (25 mrem/y). A similar calculation using the NCRP worksheet with storm water effluent MDCs found the EEG measurement program capable of detecting actinide emissions which would result in a dose that is approximately 10 times below the dose limits in 40 CFR 191 Subpart A and 40 CFR 61 Subpart H.

  6. Environmental Monitoring and Surveillance of Rodents and Vectors for Francisella tularensis Following Outbreaks of Human Tularemia in Georgia.

    Science.gov (United States)

    Elashvili, Eka; Kracalik, Ian; Burjanadze, Irma; Datukishvili, Sophio; Chanturia, Gvantsa; Tsertsvadze, Nikoloz; Beridze, Levan; Shavishvili, Merab; Dzneladze, Archil; Grdzelidze, Marina; Imnadze, Paata; Pearson, Andrew; Blackburn, Jason K

    2015-10-01

    Tularemia is a re-emerging bacterial zoonosis, broadly distributed across the northern hemisphere. In Georgia, there is a history of human tularemia outbreaks dating back to the 1940s. In response to outbreaks, health officials initiated long-term field surveillance and environmental monitoring. The objective of our study was to obtain information from 57 years of field surveys to identify species that play a role in the occurrence Francisella tularensis subsp. holarctica in the environment in Georgia. We collected historical data on human outbreaks, field collections, population dynamics of the common vole (Microtus arvalis), and conducted surveys on small mammals and vectors from five regions in Georgia during 1956-2012. Bacterial isolation was conducted using standard culturing techniques, and isolation rates for species were obtained for a subset of years. We used a Spearman rank correlation to test for associations between the density of the common vole and isolation rates. From 1956 through 2012, there were four recorded outbreaks of human tularemia (362 cases). A total of 465 bacterial isolates of F. tularensis subsp. holarctica were obtained from 27 species and environmental samples. The number of isolations was highest in the common vole (M. arvalis; 149 isolates; 32%) and Dermacentor marginatus ticks (132 isolates; 28%); isolation rates ranged between 0-0.91% and 0-0.47%, respectively. Population dynamics of the common vole were not correlated with the isolation rate. Given the history of tularemia re-emergence in Georgia, continued field surveys and environmental monitoring may provide an early indication of outbreak risk in humans. In conclusion, our findings provide evidence of long-standing foci of F. tularensis subsp. holarctica that are likely maintained by the common vole-tick cycle.

  7. Recommendations to the NRC for review criteria for alternative methods of low-level radioactive waste disposal: Environmental monitoring and surveillance programs

    International Nuclear Information System (INIS)

    Denham, D.H.; Stenner, R.D.; Eddy, P.A.; Jaquish, R.E.; Ramsdell, J.V. Jr.

    1988-07-01

    Licensing of a facility for low-level radioactive waste disposal requires the review of the environmental monitoring and surveillance programs. A set of review criteria is recommended for the US Nuclear Regulatory Commission (NRC) staff to use in each monitoring phase---preoperational, operational, and post operational---for evaluating radiological and selected nonradiological parameters in proposed environmental monitoring and surveillance programs at low-level waste disposal facilities. Applicable regulations, industry standards, and technical guidance on low-level radioactive waste are noted throughout the document. In the preoperational phase, the applicant must demonstrate that the environmental monitoring program identifies radiation levels and radionuclide concentrations at the site and also provides adequate basic data on the disposal site. Data recording and statistical analyses for this phase are addressed

  8. Large-scale projects between regional planning and environmental protection

    International Nuclear Information System (INIS)

    Schmidt, G.

    1984-01-01

    The first part of the work discusses the current law of land-use planning, municipal and technical construction planning, and licensing under the atomic energy law and the federal law on immission protection. In the second part some theses suggesting modifications are submitted. In the sector of land-use planning substantial contributions to the protection of the environment can only be expected from programs and plans (aims). For the environmental conflicts likely to arise from large-scale projects (nuclear power plant, fossil-fuel power plant) this holds good for the most part of site selection plans. They have bearings on environmental protection in that they presuppose thorough examination of facts, help to recognize possible conflicts at an early date and provide a frame for solving those problems. Municipal construction planning is guided by the following principles: Environmental protection is an equivalent planning target. Environmental data and facts and their methodical processing play a fundamental part as they constitute the basis of evaluation. Under the rules and regulations of the federal law on immission protection, section 5, number 2 - prevention of nuisances - operators are obliged to take preventive care of risks. That section is not concerned with planning or distribution. Neither does the licensing of nuclear plants have planning character. So far as the legal preconditions of licensing are fulfilled, the scope for rejection of an application under section 7, subsection 2 of the atomic energy law in view of site selection and requirement of a plant hardly carries any practical weight. (orig./HP) [de

  9. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  10. Empowering Local Organizations and Decision-makers in a Changing Climate: EO-guided Environmental Surveillance of Cholera and Rotavirus for South Asia

    Science.gov (United States)

    Akanda, A. S.; Hasan, M. A.; Jutla, A.; Aziz, S.; Alam, M.; Ahsan, G. U.; Huq, A.; Colwell, R. R.

    2017-12-01

    Despite significant advancements in scientific research, diarrheal diseases remain a leading cause of mortality and morbidity in the developing world. Although under-5 child mortality due to such diseases is dropping, prevalence of most diarrheal diseases has increased over past decades, exerting a terrible toll on global public health. Providing safe water and sanitation access, and a safe and clean environment in a sustainable manner remains a critical challenge in the face of rapid population growth, urbanization and increasing threats of natural hazards in a changing climate. We focus on the Bengal Delta region of South Asia, where Cholera and Rotavirus diarrhea continue to have a devastating impact on the public health burden. Climatic change and anthropogenic forcings have greatly affected available water quantity and quality, while the lack of effective institutions and capacity have greatly affected the water-sanitation and public health sectors. The region suffers from recurring dry season freshwater scarcity and temperature extremes, salinity intrusion in coastal areas, inland flooding during monsoons, and resulting water contamination across the delta region. We use earth observation (EO) datasets and techniques to develop a series of tools for surveillance, analysis and decision support to empower government, academic, and non-government stakeholder organizations in South Asia to monitor changes in environmental conditions related to the two most devastating diarrheal diseases, cholera and rotavirus. The developed tools will enable decision makers and stakeholders to significantly increase their understanding of the threats to public health and environmental and climatic conditions related to these diseases, ways to monitor future projections of disease risk, and help identify required policy interventions and strategies to strengthen prevention efforts and limit disease burden in near- (tactical) and long- (strategic) terms.

  11. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  12. Phase 1 of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-08-01

    The work described in this report was prompted by the public's concern about potential effect from the radioactive materials released from the Hanford Site. The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate radiation dose the public might have received from the Hanford Site since 1944, when facilities began operating. Phase 1 of the HEDR Project is a ''pilot'' or ''demonstration'' phase. The objectives of this initial phase were to determine whether enough historical information could be found or reconstructed to be used for dose estimation and develop and test conceptual and computational models for calculating credible dose estimates. Preliminary estimates of radiation doses were produced in Phase 1 because they are needed to achieve these objectives. The reader is cautioned that the dose estimates provided in this and other Phase 1 HEDR reports are preliminary. As the HEDR Project continues, the dose estimates will change for at least three reasons: more complete input information for models will be developed; the models themselves will be refined; and the size and shape of the geographic study area will change. This is one of three draft reports that summarize the first phase of the four-phased HEDR Project. This, the Summary Report, is directed to readers who want a general understanding of the Phase 1 work and preliminary dose estimates. The two other reports -- the Air Pathway Report and the Columbia River Pathway Report -- are for readers who understand the radiation dose assessment process and want to see more technical detail. Detailed descriptions of the dose reconstruction process are available in more than 20 supporting reports listed in Appendix A. 32 refs., 46 figs

  13. Environmental surveillance of the Oak Ridge Reservation and surrounding environs during 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Routine monitoring and sampling for radiation, radioactive materials, and chemical substances on and off the Oak Ridge Reservation are used to document compliance with appropriate standards, identify undesirable trends, provide information for the public, and contribute to general environmental knowledge. Regional stations located at distances of up to 140 km (90 miles) from the ORR provide a basis for determining conditions beyond the range of potential influence of the three Oak Ridge installations. Stations within the Reservation, around the perimeters and within each plant site, and in residential and community areas document conditions in areas occupied and visited by the public and potentially affected by the Oak Ridge operations. In all, during 1985 some 115,000 analyses of environmental samples were completed as part of the Reservation-wide and regional monitoring program. Included were approxiately 61,000 air, 41,000 surface water, 8090 groundwater, 2400 wastewater, 80 fish, 231 soil, 132 grass, 36 pine needle, 360 sediment, and 80 external gamma analyses

  14. Environmental surveillance of the Oak Ridge Reservation and surrounding environs during 1985

    Energy Technology Data Exchange (ETDEWEB)

    1986-04-01

    Routine monitoring and sampling for radiation, radioactive materials, and chemical substances on and off the Oak Ridge Reservation are used to document compliance with appropriate standards, identify undesirable trends, provide information for the public, and contribute to general environmental knowledge. Regional stations located at distances of up to 140 km (90 miles) from the ORR provide a basis for determining conditions beyond the range of potential influence of the three Oak Ridge installations. Stations within the Reservation, around the perimeters and within each plant site, and in residential and community areas document conditions in areas occupied and visited by the public and potentially affected by the Oak Ridge operations. In all, during 1985 some 115,000 analyses of environmental samples were completed as part of the Reservation-wide and regional monitoring program. Included were approxiately 61,000 air, 41,000 surface water, 8090 groundwater, 2400 wastewater, 80 fish, 231 soil, 132 grass, 36 pine needle, 360 sediment, and 80 external gamma analyses.

  15. Integrated environmental monitoring program at the Hanford Site

    International Nuclear Information System (INIS)

    Jaquish, R.E.

    1990-08-01

    The US Department of Energy's Hanford Site, north of Richland, Washington, has a mission of defense production, waste management, environmental restoration, advanced reactor design, and research development. Environmental programs at Hanford are conducted by Pacific Northwest Laboratory (PNL) and the Westinghouse Hanford Company (WHC). The WHC environmental programs include the compliance and surveillance activities associated with site operations and waste management. The PNL environmental programs address the site-wide and the of-site areas. They include the environmental surveillance and the associated support activities, such as dose calculations, and also the monitoring of environmental conditions to comply with federal and state environmental regulations on wildlife and cultural resources. These are called ''independent environmental programs'' in that they are conducted completely separate from site operations. The Environmental Surveillance and Oversight Program consists of the following projects: surface environmental surveillance; ground-water surveillance; wildlife resources monitoring; cultural resources; dose overview; radiation standards and calibrations; meteorological and climatological services; emergency preparedness

  16. The Industrial Toxics Project: Targeting chemicals for environmental results

    International Nuclear Information System (INIS)

    Burch, W.M.

    1991-01-01

    In September, 1990, the Administrator of the US Environmental Protection Agency committed the Agency to a program of targeting chemicals for multi-media risk reduction activities through pollution prevention. The Industrial Toxics Project will place emphasis on obtaining voluntary commitments from industry to reduce releases of toxic chemicals to the air, water, and land with a goal of reducing releases nationwide by 33% by 1992 and 50% by 1995. An initial list of 18 chemicals have been selected based on recommendations from each Agency program. The chemicals selected are subject to reporting under the Toxic Chemical Release Inventory Program which will provide the basis for tracking progress. The chemicals are characterized by high production volume, toxicity and releases and present the potential for significant risk reduction through pollution prevention. This presentation will discuss the focus and direction of this new initiative

  17. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  18. Applications of stable isotope analysis in foodstuffs surveillance and environmental research

    International Nuclear Information System (INIS)

    Pichlmayer, F.; Blochberger, F.

    1991-12-01

    The instrumental coupling of Elemental Analysis and Mass Spectrometry, constituting a convenient tool for isotope ratio measurements of the bioelements in solid or liquid samples is now well established. Advantages of this technique compared with the so far usual wet chemistry sample preparation are: speed of analysis, easy operation and minor sample consumption. The performance of the system is described and some applications are given. Detection of foodstuffs adulterations is mainly based on the natural carbon isotope differences between C 3 - and C 4 -plants. In the field of environmental research the existing small isotopic variations of carbon, nitrogen and sulfur in nature, which depend on substance origin and history, are used as intrinsic signature of the considered sample. Examples of source appointment or exclusion by help of this natural isotopic tracer method are dealt with. (authors)

  19. Radioecological surveillance around an old mining and milling site during environmental remediation works

    International Nuclear Information System (INIS)

    Carvalho, Fernando P.; Oliveira, Joao M.; Malta, Margarida

    2008-01-01

    The main site of historic uranium mining and milling in Portugal, near the town of Canas de Senhorim, contains around 2.5 million tones of solid waste containing radioactivity in various mill tailings and spoil heaps. Approval of an environmental remediation plan for this area was followed by the start of engineering works, including the transportation of milling waste to the main milling pile and re shaping and contouring the waste heap to put a cap layer. These works were mostly performed in 2006 and 2007. During part of this period monitoring of radioactivity, including radon, was performed in the surface air, surface waters from the area, including the monitoring of the small river that receives drainage from the mill tailings area, and agriculture products. This paper presents the results of measurements of the main alpha emitting radionuclides of uranium series and compares them with previous data from the region. Implications for the radiological protection of the population are discussed. (author)

  20. Control of effluents and environmental surveillance of the CEA centres. 1997 status

    International Nuclear Information System (INIS)

    1998-06-01

    The environmental quality in the vicinity of CEA facilities is a major concern of the safety policy of the CEA. The aim of this document is to inform the public about the gaseous and liquids radioactive effluents released by the CEA centres under the permission of the ministry. It provides a status of the effluents and of the radioactivity levels measured near the CEA centres in 1997, using air, water, vegetation and milk samples. A comparison is made with the measurements performed during the 1993-1996 period. The data presented comes from the regulatory registers transmitted to the agency for the protection against ionizing radiations (OPRI) which belongs to the ministry of health. (J.S.)