WorldWideScience

Sample records for electric reliability council

  1. North American Electric Reliability Council (NERC) Reliability Coordinators

    Data.gov (United States)

    Department of Homeland Security — ERC is an international regulatory authority that works to improve the reliability of the bulk power system in North America. NERC works with many different regional...

  2. Demand participation in the restructured Electric Reliability Council of Texas market

    International Nuclear Information System (INIS)

    Zarnikau, Jay W.

    2010-01-01

    Does an electricity market which has been restructured to foster competition provide greater opportunities for demand response than a traditional regulated utility industry? The experiences of the restructured Electric Reliability Council of Texas (ERCOT) market over the past eight years provide some hope that it is possible to design a competitive market which will properly value and accommodate demand response. While the overall level of demand response in ERCOT is below the levels enjoyed prior to restructuring, there have nonetheless been some promising advances, including the integration of demand-side resources into competitive markets for ancillary services. ERCOT's experiences demonstrate that the degree of demand participation in a restructured market is highly sensitive to the market design. But even in a market which has been deregulated to a large degree, regulatory intervention and special demand-side programs may be needed in order to bolster demand response. (author)

  3. Electric power supply and demand 1979 to 1988 for the contiguous United States as projected by the Regional Electric Reliability Councils in their April 1, 1979 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    Savage, N.; Graban, W.

    1979-12-01

    Information concerning bulk electric power supply and demand is summarized and reviewed. Electric-utility power-supply systems are composed of power sources, transmission and distribution facilities, and users of electricity. In the United States there are three such systems of large geographic extent that together cover the entire country. Subjects covered are: energy forecasts, peak demand forecasts, generating-capacity forecasts, purchases and sales of capacity, and transmission. Extensive data are compiled in 17 tables. Information in two appendices includes a general description of the Regional Electric Reliability Councils and US generating capacity as of June 30, 1979. 3 figures, 17 tables.

  4. Hawaii Electric System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Loose, Verne William [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Silva Monroy, Cesar Augusto [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2012-08-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers’ views of reliability “worth” and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers’ views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  5. Hawaii electric system reliability.

    Energy Technology Data Exchange (ETDEWEB)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  6. Electric power supply and demand 1978--1987 for the continuous United States as projected by the Regional Electric Reliability Councils in their April 1, 1978 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    1978-06-15

    The Regional Reliability Council projections of peak demand, generating capability, and electric energy requirements for the contiguous U.S. have declined for the fourth consecutive year. On the basis of these projections, it appears that the electric utility industry believes the U.S. will experience smaller annual increases in power use than have occurred in the past. The summer peak demand growth rates of the Councils range from 3.52 percent annually, as projected by the Northeast Power Coordinating Council, to the 6.21 percent projected by the Southwest Power Pool. Subregional growth covers a wider range, from the 2.77 percent of the New York Power Pool to the 6.51 percent of the Southern Company area. Total reserve margins at the time of summer peak demands are projected to decline from an estimated 30.16 percent in 1978 to about 23.81 percent in 1987. If projected loads are not exceeded, if projected capability levels are actually attained, if fuel requirements are satisfied, and if no contingencies worse than those normally met with are experienced, electric power supply should be adequate for the next decade. However, it is possible that the projected reserve margins will not be attained, and that adequate primary energy supply (fuel and hydro) will not be available when needed. Completion of generating units and transmission facilities on schedule is made uncertain by difficulties related to financing, environmental pressures, procedural delays and some inadequacies with respect to quality control of manufactured and field-assembled components.

  7. INCREASED RELIABILITY OF ELECTRIC BLASTING

    OpenAIRE

    Kashuba, Oleh Ivanovych; Skliarov, L I; Skliarov, A L

    2017-01-01

    The problems of improving reliability of an electric blasting method using electric detonators with nichrome filament bridges. It was revealed that in the calculation of the total resistance of the explosive network it is necessary to increase to 24% of the nominal value

  8. Electricity Sector Council : human resources challenges

    Energy Technology Data Exchange (ETDEWEB)

    Goldie, T. [Electricity Sector Council, Ottawa, ON (Canada)

    2007-07-01

    The electricity sector is currently undergoing significant human resource challenges. Several charts illustrated the aging Canadian workforce; workforce by key occupation; statistics on a 2004 sector study requirements of retirement estimations; and average annual growth rate of the domestic labour force. Several slides also depicted the dependence on immigrants for labour growth; trades intake through immigration; and a 2007 environmental scan. The presentation also provided information on the Electricity Sector Council (ESC) and its projects and occupational standards currently under development. The ESC in partnership with Human Resources and Social Development Canada has begun the process of developing a National Occupational Standard for geoexchange professionals. It is intended to enable colleges and Ministries of Education to standardize national training and evaluate new hires. Last, several slides containing background information on the ESC board of directors were included along with slides of labour market information; connectivity; and projects under development. tabs., figs.

  9. Electricity Sector Council : human resources challenges

    International Nuclear Information System (INIS)

    Goldie, T.

    2007-01-01

    The electricity sector is currently undergoing significant human resource challenges. Several charts illustrated the aging Canadian workforce; workforce by key occupation; statistics on a 2004 sector study requirements of retirement estimations; and average annual growth rate of the domestic labour force. Several slides also depicted the dependence on immigrants for labour growth; trades intake through immigration; and a 2007 environmental scan. The presentation also provided information on the Electricity Sector Council (ESC) and its projects and occupational standards currently under development. The ESC in partnership with Human Resources and Social Development Canada has begun the process of developing a National Occupational Standard for geoexchange professionals. It is intended to enable colleges and Ministries of Education to standardize national training and evaluate new hires. Last, several slides containing background information on the ESC board of directors were included along with slides of labour market information; connectivity; and projects under development. tabs., figs.

  10. 78 FR 7773 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Science.gov (United States)

    2013-02-04

    ... Board of Trustees Meetings, Board of Trustees Compliance Committee, Corporate Governance and Human Resources Committee, and Standards Oversight and Technology Committee Meetings. Hotel del Coronado, 1500... Association, Inc. v. Western Electric Coordinating Council and North American Electric Reliability Corporation...

  11. Reliability risks during the transition to competitive electricity markets

    International Nuclear Information System (INIS)

    Hughes, J.P.

    2005-01-01

    The Electricity Consumers Resource Council (ELCON) is a U.S. association representing industrial consumers of electricity, and is a long-standing advocate of competition in the electric power industry. However, because a reliable grid is necessary to support competitive wholesale markets, ELCON believes that the transmission system is an essential facility that must remain regulated. The initiatives discussed in this white paper represent significant steps that the National Electric Reliability Council (NERC) and the industry have taken to improve reliability in a competitive and restructured electric industry. Strategic manoeuvres of incumbent utilities to maintain market share were evaluated, as well as discrimination against potential competitors. It was suggested that, occasionally, indecisive federal policies have been taken advantage of by utilities. The unintended consequences of state restructuring policies that allow utilities to over-earn their revenue requirements were reviewed. NERC reliability standards will remain unenforceable until a new Electricity Reliability Organization has been certified. Flawed market designs and inadequate market power mitigation, as well as the financial distress of merchant generators, pose considerable risks. It was suggested that these risks could trigger transmission loading relief incidents, local outages or widespread outages. In the absence of mandatory reliability standards with penalties, and complementary market rules for mitigating generation and transmission market power, economic incentives will encourage other forms of opportunistic behavior that may be the root cause of other outages. Public concern regarding these risks to grid reliability may result in lost public support for competitive electricity markets. Proposed solutions include the certification of a new Electric Reliability Organization to establish and enforce mandatory reliability standards, and granting the Federal Energy Regulatory Commission

  12. Green power. Renewable electricity purchasing by Leicester City Council

    International Nuclear Information System (INIS)

    2000-05-01

    This case study describes the use of renewable energy by Leicester City Council in the East Midlands. The Council, which has a long-term commitment to sustainable energy and the environment, employs over 14,000 people. A contract was first negotiated with East Midlands Electricity (now PowerGen) to supply the Council's New Walk Centre with green electricity in 1995. Some of the green energy is supplied by the Milford Mill hydroelectric plant. Use of building energy monitoring systems (BEMSs) and other good practice has allowed the Council to achieve a 20% saving in its electricity bill. The Council has also negotiated contracts to supply two smaller sites (a recycling facility called Planet Works and the city's Energy Efficiency centre) with green electricity generated by Beacon Energy, a small renewable energy company which operates two 25 kW wind turbines and two 3 kW arrays of photovoltaic cells at a site some 15 miles from Leicester. The exemption given to renewable energy from the climate change levy makes these schemes even more economic; a worked example is provided to demonstrate the impact of the climate change levy on electricity costs at the New Walk Centre. Six steps to follow when seeking to connect to green electricity are advised

  13. 78 FR 41339 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Science.gov (United States)

    2013-07-10

    ...] Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards AGENCY: Federal... Reliability Standards identified by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. FOR FURTHER INFORMATION CONTACT: Kevin Ryan (Legal Information...

  14. Comments of Dr. John A. Anderson, executive director of the Electricity Consumers Resource Council

    International Nuclear Information System (INIS)

    Anderson, J.A.

    1998-01-01

    The Electricity Consumers Resource Council (ELCON)'s view of the need for deregulation, and the advantages and pitfalls of deregulation were discussed, based on the experience of some large electric power customers in the United States. ELCON is a US group of 37 large industrial electricity consumers that was created to promote the development and adaption of rational federal and state policies that assure an adequate, reliable and efficient electricity supply at competitive prices. ELCON's member companies operate more than 650 different facilities in the US. ELCON strongly believes that restructuring will greatly benefit consumers, mainly by giving them choices. The Council is dedicated to ensuring that US electric utilities become utilities with real competition and not unregulated monopolies. In the past, electricity consumers have encountered several problems with the traditional rate regulation of electric utilities. These problems have driven many large industrial and commercial customers to find ways to reduce their electric bills through options such as self-generation, alternative hook-ups, municipalization, loopholes and fuel switching. These options themselves have created some additional problems. The most obvious of these is that when these large electricity consumers depart from the local utility, they stop paying their share of previously-incurred costs which the remaining customers must pay, which forces prices even higher. The need to regulate transmission and distribution as long as there are natural monopolies was discussed. It was suggested that transmission grids should be operated by Independent System Operators (ISOs) who have no financial interests in market transactions

  15. 76 FR 58101 - Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard

    Science.gov (United States)

    2011-09-20

    ....C. Cir. 2009). \\4\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC... for maintaining real and reactive power balance. \\14\\ Electric Reliability Organization Interpretation...; Order No. 753] Electric Reliability Organization Interpretation of Transmission Operations Reliability...

  16. Citizen Advisory Council use in the electric utility industry

    International Nuclear Information System (INIS)

    McElfresh, R.W.

    1991-01-01

    Many electric utility companies have come to realize the Importance of seeking public input before launching corporate resources into major construction projects. One way to organize this input is to establish a Citizen Advisory Council (CAC). This paper describes the purpose of such a group, its advantages and limitations, and how it might be organized. This paper also describes the results of a survey of CAC use for facility siting purposes. Fifty large utility companies were contacted, eleven of which use CACs for siting purposes. Six of these were questioned in greater detail as to their success in using CACs on specific projects. All companies were positive about the use of CACs for public participation because the groups were able to bring valuable information to light and company credibility was enhanced. Most importantly, the responding companies believed they were able to save time in the siting and licensing process

  17. Reliability planning in distributed electric energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.

    1978-10-01

    The goal of this paper is to develop tools for technology evaluation that address questions involving the economics of large-scale systems. The kind of cost discussed usually involves some dynamic aspect of the energy system. In particular, such properties as flexibility, stability, and resilience are features of entire systems. Special attention must be paid to the question of reliability, i.e., availability on demand. The storage problem and the planning for reliability in utility systems are the subjects of this paper. The introductory chapter addresses preliminary definitions--reliability planning, uncertainty, resilience, and other sensitivities. The study focuses on the contrast between conventional power generation technologies with controllable output and intermittent resources such as wind and solar electric conversion devices. The system studied is a stylized representation of California conditions. Significant differences were found in reliability planning requirements (and therefore costs) for systems dominated by central station plants as opposed to those dominated by intermittent resource technologies. It is argued that existing hydroelectric facilities need re-optimization. These plants provide the only currently existing bulk power storage in electric energy systems. 38 references. (MCW)

  18. Novel approach for evaluation of service reliability for electricity customers

    Institute of Scientific and Technical Information of China (English)

    JIANG; John; N

    2009-01-01

    Understanding reliability value for electricity customer is important to market-based reliability management. This paper proposes a novel approach to evaluate the reliability for electricity customers by using indifference curve between economic compensation for power interruption and service reliability of electricity. Indifference curve is formed by calculating different planning schemes of network expansion for different reliability requirements of customers, which reveals the information about economic values for different reliability levels for electricity customers, so that the reliability based on market supply demand mechanism can be established and economic signals can be provided for reliability management and enhancement.

  19. 76 FR 73608 - Reliability Technical Conference, North American Electric Reliability Corporation, Public Service...

    Science.gov (United States)

    2011-11-29

    ... or municipal authority play in forming your bulk power system reliability plans? b. Do you support..., North American Electric Reliability Corporation (NERC) Nick Akins, CEO of American Electric Power (AEP..., EL11-62-000] Reliability Technical Conference, North American Electric Reliability Corporation, Public...

  20. Alberta's electricity policy framework : competitive, reliable, sustainable

    International Nuclear Information System (INIS)

    2005-01-01

    This paper described public policies in Alberta that are implemented to create an electric power industry that is competitive, reliable and sustainable. The success of Alberta's competitive electric market framework can be attributed to new investment in the industry along with new players participating in the electricity market. The Alberta Department of Energy is committed to a competitive wholesale market model and to competitively-priced electricity. The Alberta Energy and Utilities Board supports the development of Alberta's vast resource base and facilitates power generation development and support through transmission development and an interconnected transmission system. A wholesale market Policy Task Force was established in 2005 to review the progress in Alberta's electric market design and its competitive retail market. This paper outlines a policy framework which addresses design of the regulated rate option post July 1, 2006; short-term adequacy; and long-term adequacy. Other inter-related market issues were also discussed, such as operating reserves market, transmission services, interties, demand response, balancing pool assets, credit, market power mitigation, and wind generation. It is expected that the recommendations in this paper will be implemented as quickly as possible following amendments to regulations or ISO rules. tabs., figs.

  1. Will British weather provide reliable electricity?

    International Nuclear Information System (INIS)

    Oswald, James; Raine, Mike; Ashraf-Ball, Hezlin

    2008-01-01

    There has been much academic debate on the ability of wind to provide a reliable electricity supply. The model presented here calculates the hourly power delivery of 25 GW of wind turbines distributed across Britain's grid, and assesses power delivery volatility and the implications for individual generators on the system. Met Office hourly wind speed data are used to determine power output and are calibrated using Ofgem's published wind output records. There are two main results. First, the model suggests that power swings of 70% within 12 h are to be expected in winter, and will require individual generators to go on or off line frequently, thereby reducing the utilisation and reliability of large centralised plants. These reductions will lead to increases in the cost of electricity and reductions in potential carbon savings. Secondly, it is shown that electricity demand in Britain can reach its annual peak with a simultaneous demise of wind power in Britain and neighbouring countries to very low levels. This significantly undermines the case for connecting the UK transmission grid to neighbouring grids. Recommendations are made for improving 'cost of wind' calculations. The authors are grateful for the sponsorship provided by The Renewable Energy Foundation

  2. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  3. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  4. 18 CFR 39.3 - Electric Reliability Organization certification.

    Science.gov (United States)

    2010-04-01

    ... operators of the Bulk-Power System, and other interested parties for improvement of the Electric Reliability... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Electric Reliability..., Reliability Standards that provide for an adequate level of reliability of the Bulk-Power System, and (2) Has...

  5. 77 FR 39858 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2012-07-05

    ... bulk electric system reliability through steady state power flow, and contain a transient stability... Commission 18 CFR Part 40 Revisions to Electric Reliability Organization Definition of Bulk Electric System... definition of ``bulk electric system'' developed by the North American Electric Reliability Corporation (NERC...

  6. Research on the Reliability Testing of Electrical Automation Control Equipment

    OpenAIRE

    Yongjie Luo

    2014-01-01

    According to the author’s many years’ work experience, this paper first discusses the concepts of electrical automation control equipment reliability testing, and then analyzes the test method of electrical automation control equipment reliability testing, finally, on this basis, this article discusses how to determine the reliability test method of electrical automation control equipment. Results of this study will provide a useful reference for electrical automation control equipment reliab...

  7. 76 FR 23171 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Science.gov (United States)

    2011-04-26

    ... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g...-Power System reliability may request an interpretation of a Reliability Standard.\\7\\ The ERO's standards... information in its reliability assessments. The Reliability Coordinator must monitor Bulk Electric System...

  8. 76 FR 66055 - North American Electric Reliability Corporation; Order Approving Interpretation of Reliability...

    Science.gov (United States)

    2011-10-25

    ...\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242... materially affected'' by Bulk-Power System reliability may request an interpretation of a Reliability... Electric Reliability Corporation; Order Approving Interpretation of Reliability Standard; Before...

  9. 75 FR 72909 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2010-11-26

    ... Bulk-Power System. See Rules Concerning Certification of the Electric Reliability Organization; and... Bulk-Power System in North America because it protects the reliability of the bulk electric system and... Electric Reliability Organization Definition of Bulk Electric System; Final Rule #0;#0;Federal Register...

  10. 78 FR 29209 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2013-05-17

    ... Commission 18 CFR Part 40 Revisions to Electric Reliability Organization Definition of Bulk Electric System... local distribution'' as set forth in the Federal Power Act (FPA). \\1\\ Revisions to Electric Reliability... Reliability Organization Definition of Bulk Electric System, Order No. 743, 133 FERC ] 61,150, at P 16 (2010...

  11. 76 FR 16263 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2011-03-23

    ...; Order No. 743-A] Revision to Electric Reliability Organization Definition of Bulk Electric System AGENCY... certain provisions of the Final Rule. Order No. 743 directed the Electric Reliability Organization (ERO) to revise the definition of the term ``bulk electric system'' through the ERO's Reliability Standards...

  12. Generating solutions : summary of the Electricity Sector Council's review of foreign credential recognition

    International Nuclear Information System (INIS)

    2008-03-01

    The Electricity Sector Council has recognized the increasing requirement to recruit and retain internationally trained workers to offset the anticipated retirement of up to 40 per cent of skilled workers in this sector by 2014. This document provided a brief summary of the review of foreign credential recognition in Canada's Electricity Council which was prepared in February 2008. The purpose of the study was to capture a perceptive picture of Canada's electricity labour force and to assist the Electricity Sector Council in the potential development and implementation of strategies to facilitate the integration of internationally trained workers into Canada's electricity sector. This synopsis report presented the analysis of the study including a discussion of immigration trends; foreign credential recognition in Canada's electricity sector; immigration profiles by region; case study profiles; and recommendations. It was recommended that resources be researched, developed and provided in order to help stakeholders attract, recruit, retain and integrate internationally trained workers. 2 refs

  13. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Science.gov (United States)

    2011-04-26

    ....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... Reliability Standards for the Bulk-Power System. Action: FERC-725A. OMB Control No.: 1902-0244. Respondents...] Electric Reliability Organization Interpretation of Transmission Operations Reliability AGENCY: Federal...

  14. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    Directory of Open Access Journals (Sweden)

    Mark Ndubuka NWOHU

    2007-09-01

    Full Text Available The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. This paper presents an economic framework that can be used to optimize electric power system reliability. Finally the cost models are investigated to take into account the economic analysis of system reliability, which can be periodically updated to improve overall reliability of electric power system.

  15. Improvement of standards on functional reliability of electric power systems

    International Nuclear Information System (INIS)

    Barinov, V.A.; Volkov, G.A.; Kalita, V.V.; Kogan, F.L.; Makarov, S.F.; Manevich, A.S.; Mogirev, V.V.; Sin'chugov, F.I.; Skopintsev, V.A.; Khvoshchinskaya, Z.G.

    1993-01-01

    Analysis of the most principal aspects of the existing standards and requirements on assuring safety and stability of electric power systems (EPS) and effective (reliable and economical) power supply of consumers is given. The reliability is determined as ability to accomplish the assigned functions. Basic recommendations on improving the standards regulating the safety and reliability of the NPP functioning are formulated

  16. Demand Response Application forReliability Enhancement in Electricity Market

    OpenAIRE

    Romera Pérez, Javier

    2015-01-01

    The term reliability is related with the adequacy and security during operation of theelectric power system, supplying the electricity demand over time and saving thepossible contingencies because every inhabitant needs to be supplied with electricity intheir day to day. Operating the system in this way entails spending money. The first partof the project is going to be an analysis of the reliability and the economic impact of it.During the last decade, electric utilities and companies had be...

  17. 76 FR 66057 - North American Electric Reliability Corporation; Order Approving Regional Reliability Standard

    Science.gov (United States)

    2011-10-25

    ... Reliability Standard that is necessitated by a physical difference in the Bulk-Power System.\\7\\ \\7\\ Order No... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g... electric system event analyses and thereby improve system reliability by promoting improved system design...

  18. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    OpenAIRE

    Mark Ndubuka NWOHU

    2007-01-01

    The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. ...

  19. Distribution-level electricity reliability: Temporal trends using statistical analysis

    International Nuclear Information System (INIS)

    Eto, Joseph H.; LaCommare, Kristina H.; Larsen, Peter; Todd, Annika; Fisher, Emily

    2012-01-01

    This paper helps to address the lack of comprehensive, national-scale information on the reliability of the U.S. electric power system by assessing trends in U.S. electricity reliability based on the information reported by the electric utilities on power interruptions experienced by their customers. The research analyzes up to 10 years of electricity reliability information collected from 155 U.S. electric utilities, which together account for roughly 50% of total U.S. electricity sales. We find that reported annual average duration and annual average frequency of power interruptions have been increasing over time at a rate of approximately 2% annually. We find that, independent of this trend, installation or upgrade of an automated outage management system is correlated with an increase in the reported annual average duration of power interruptions. We also find that reliance on IEEE Standard 1366-2003 is correlated with higher reported reliability compared to reported reliability not using the IEEE standard. However, we caution that we cannot attribute reliance on the IEEE standard as having caused or led to higher reported reliability because we could not separate the effect of reliance on the IEEE standard from other utility-specific factors that may be correlated with reliance on the IEEE standard. - Highlights: ► We assess trends in electricity reliability based on the information reported by the electric utilities. ► We use rigorous statistical techniques to account for utility-specific differences. ► We find modest declines in reliability analyzing interruption duration and frequency experienced by utility customers. ► Installation or upgrade of an OMS is correlated to an increase in reported duration of power interruptions. ► We find reliance in IEEE Standard 1366 is correlated with higher reported reliability.

  20. Reliability evaluation of deregulated electric power systems for planning applications

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A.M.; Jafari, A.; Fotuhi-Firuzabad, M.

    2008-01-01

    In a deregulated electric power utility industry in which a competitive electricity market can influence system reliability, market risks cannot be ignored. This paper (1) proposes an analytical probabilistic model for reliability evaluation of competitive electricity markets and (2) develops a methodology for incorporating the market reliability problem into HLII reliability studies. A Markov state space diagram is employed to evaluate the market reliability. Since the market is a continuously operated system, the concept of absorbing states is applied to it in order to evaluate the reliability. The market states are identified by using market performance indices and the transition rates are calculated by using historical data. The key point in the proposed method is the concept that the reliability level of a restructured electric power system can be calculated using the availability of the composite power system (HLII) and the reliability of the electricity market. Two case studies are carried out over Roy Billinton Test System (RBTS) to illustrate interesting features of the proposed methodology

  1. Puget Sound area electric reliability plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

  2. FUNDAMENTALS OF RELIABILITY OF ELECTRIC POWER SYSTEM AND EQUIPMENT

    OpenAIRE

    Engr. Anumaka; Michael Chukwukadibia

    2011-01-01

    Today, the electric power system consists of complex interconnected network which are prone to different problems that militates against the reliability of the power system. Inadequate reliability in the power system causes problems such as high failure rate of power system installations and consumer equipment, transient and intransient faults, symmetrical faults etc. This paper provides an extensive review of the powers system and equipment reliability and related failure patterns in equipment.

  3. Generating solutions : summary of the Electricity Sector Council's review of foreign credential recognition

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-03-15

    The Electricity Sector Council has recognized the increasing requirement to recruit and retain internationally trained workers to offset the anticipated retirement of up to 40 per cent of skilled workers in this sector by 2014. This document provided a brief summary of the review of foreign credential recognition in Canada's Electricity Council which was prepared in February 2008. The purpose of the study was to capture a perceptive picture of Canada's electricity labour force and to assist the Electricity Sector Council in the potential development and implementation of strategies to facilitate the integration of internationally trained workers into Canada's electricity sector. This synopsis report presented the analysis of the study including a discussion of immigration trends; foreign credential recognition in Canada's electricity sector; immigration profiles by region; case study profiles; and recommendations. It was recommended that resources be researched, developed and provided in order to help stakeholders attract, recruit, retain and integrate internationally trained workers. 2 refs.

  4. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph

    2003-07-30

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.

  5. Influence of reliability of the relay protection to the whole reliability of electric power systems

    International Nuclear Information System (INIS)

    Stojanovski, Ljupcho I.

    2001-01-01

    The influence of the reliability of the elements of relay protection up today analyses of the reliability on electric power systems, very rare has been taken into consideration, in other words, in these analyses it is assumed that the reliability of the protection has value one. In this work an attempt is that through modelling of individual types of protection of the elements of high-voltage systems to make calculation to the influence of the reliability of the relay protection on the total reliability of the high-voltage systems.(Author)

  6. 75 FR 14097 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2010-03-24

    ... electrical failure of a 138 kV motor operated switch on a 138 kV-13 kV transformer located in the ReliabilityFirst region resulted in the tripping of two transformers, one due to the electrical failure and the... Commission 18 CFR Part 40 [Docket No. RM09-18-000; 130 FERC ] 61,204] Revision to Electric Reliability...

  7. A COMPUTERIZED DIAGNOSTIC COMPLEX FOR RELIABILITY TESTING OF ELECTRIC MACHINES

    Directory of Open Access Journals (Sweden)

    O.О. Somka

    2015-06-01

    Full Text Available Purpose. To develop a diagnostic complex meeting the criteria and requirements for carrying out accelerated reliability test and realizing the basic modes of electric machines operation and performance of the posed problems necessary in the process of such test. Methodology. To determine and forecast the indices of electric machines reliability in accordance with the statistic data of repair plants we have conditionally divided them into structural parts that are most likely to fail. We have preliminarily assessed the state of each of these parts, which includes revelation of faults and deviations of technical and geometric parameters. We have determined the analyzed electric machine controlled parameters used for assessment of quantitative characteristics of reliability of these parts and electric machines on the whole. Results. As a result of the research, we have substantiated the structure of a computerized complex for electric machines reliability test. It allows us to change thermal and vibration actions without violation of the physics of the processes of aging and wearing of the basic structural parts and elements material. The above mentioned makes it possible to considerably reduce time spent on carrying out electric machines reliability tests and improve trustworthiness of the data obtained as a result of their performance. Originality. A special feature of determination of the controlled parameters consists in removal of vibration components in the idle mode and after disconnection of the analyzed electric machine from the power supply with the aim of singling out the vibration electromagnetic component, fixing the degree of sparking and bend of the shaft by means of phototechnique and local determination of structural parts temperature provided by corresponding location of thermal sensors. Practical value. We have offered a scheme of location of thermal and vibration sensors, which allows improvement of parameters measuring accuracy

  8. Applying reliability analysis to design electric power systems for More-electric aircraft

    Science.gov (United States)

    Zhang, Baozhu

    The More-Electric Aircraft (MEA) is a type of aircraft that replaces conventional hydraulic and pneumatic systems with electrically powered components. These changes have significantly challenged the aircraft electric power system design. This thesis investigates how reliability analysis can be applied to automatically generate system topologies for the MEA electric power system. We first use a traditional method of reliability block diagrams to analyze the reliability level on different system topologies. We next propose a new methodology in which system topologies, constrained by a set reliability level, are automatically generated. The path-set method is used for analysis. Finally, we interface these sets of system topologies with control synthesis tools to automatically create correct-by-construction control logic for the electric power system.

  9. Reliability modeling of Clinch River breeder reactor electrical shutdown systems

    International Nuclear Information System (INIS)

    Schatz, R.A.; Duetsch, K.L.

    1974-01-01

    The initial simulation of the probabilistic properties of the Clinch River Breeder Reactor Plant (CRBRP) electrical shutdown systems is described. A model of the reliability (and availability) of the systems is presented utilizing Success State and continuous-time, discrete state Markov modeling techniques as significant elements of an overall reliability assessment process capable of demonstrating the achievement of program goals. This model is examined for its sensitivity to safe/unsafe failure rates, sybsystem redundant configurations, test and repair intervals, monitoring by reactor operators; and the control exercised over system reliability by design modifications and the selection of system operating characteristics. (U.S.)

  10. 75 FR 15371 - Time Error Correction Reliability Standard

    Science.gov (United States)

    2010-03-29

    ... Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers. As the independent system operator for the region, ERCOT schedules power on an electric grid that... Coordinating Council (WECC) is responsible for coordinating and promoting bulk electric system reliability in...

  11. Reliability & availability of wind turbine electrical & electronic components

    NARCIS (Netherlands)

    Tavner, P.; Faulstich, S.; Hahn, B.; Bussel, van G.J.W.

    2010-01-01

    Recent analysis of European onshore wind turbine reliability data has shown that whilst wind turbine mechanical subassemblies tend to have relatively low failure rates but long downtimes, electrical and electronic subassemblies have relatively high failure rates and short downtimes. For onshore wind

  12. Load As A Reliability Resource in the Restructured Electricity Market

    Energy Technology Data Exchange (ETDEWEB)

    Kueck, J.D.

    2002-06-10

    Recent electricity price spikes are painful reminders of the value that meaningful demand-side responses could bring to the restructuring US electricity system. Review of the aggregate offers made by suppliers confirms that even a modest increase in demand elasticity could dramatically reduce these extremes in price volatility. There is a strong need for dramatically increased customer participation in these markets to enhance system reliability and reduce price volatility. Indeed, allowing customers to manage their loads in response to system conditions might be thought of as the ultimate reliability resource. Most would agree that meaningful demand-side responses to price are the hallmark of a well-functioning competitive market [1]. Yet, in today's markets for electricity, little or no such response is evident. The reason is simple: customers currently do not experience directly the time-varying costs of their consumption decisions. Consequently, they have no incentive to modify these decisions in ways that might enhance system reliability or improve the efficiency of the markets in which electricity is traded. Increased customer participation is a necessary step in the evolution toward more efficient markets for electricity and ancillary services. This scoping report provides a three-part assessment of the current status of efforts to enhance the ability of customer's load to participate in competitive markets with a specific focus on the role of customer loads in enhancing electricity system reliability. First, this report considers the definitions of electricity-reliability-enhancing ancillary services (Section 2) and a preliminary assessment of the ability of customer's loads to provide these services. Second, is a review a variety of programs in which load has been called on as a system reliability resource (Section 3). These experiences, drawn from both past and current utility and ISO programs, focus on programs triggered by system

  13. 75 FR 80391 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Science.gov (United States)

    2010-12-22

    ... transmission (G&T) cooperative or similar organization to accept compliance responsibility on behalf of its... be found on the Commission's Web site; see, e.g., the ``Quick Reference Guide for Paper Submissions... Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ] 31,204, order on reh'g, Order No. 672...

  14. Staff Report to the Secretary on Electricity Markets and Reliability

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-01

    Energy Secretary Rick Perry issued a memo in April of 2017 requesting a study and directing his staff to develop a report to include an assessment of the reliability and resilience of the electric grid and an overview of the evolution of electricity markets. Various factors have emerged over the past 15 years which have impacted power supply and demand in different ways. This study, prepared by experts throughout the Department, contains a comprehensive analysis of these factors and the corresponding data, and presents a series of recommendations meant to inform and guide policy makers, regulators, and the general public. Potential areas for further research are also presented.

  15. Interim report by a Committee on Demands and Supplies of Electric Enterprise Council

    International Nuclear Information System (INIS)

    1984-01-01

    An interim report by a committee on demands and supplies, Electric Enterprise Council, was given for the period up to the year 2000. The demands of electric power in Japan were set as 658,000 million kWh for 1990 and 768,000 million kWh for 1995. The electric power enterprises appear to be at a major turning point at present, that is, the growth in the demands tended to slow down. The features of the situation are then the stabilized supply, supply cost reduction, reasonable power source constitution, etc. The following things are described. Background and policy; power demand outlook and supply measures; power supply and supply efficiency (the composition of power sources, respective power sources with supply targets and problems, etc.); power demand/supply outlook for 2000. (Mori, K.)

  16. Managing relationships between electric power industry restructuring and grid reliability

    International Nuclear Information System (INIS)

    Thomas, R.J.

    2005-01-01

    The electricity system is a critical infrastructure, and its continued and reliable functioning is essential to the nation's economy and well-being. However, the inter-dependency of electricity networks is not completely understood. The economic impact of outages was discussed in this white paper. It was suggested that moving to a restructured environment has degraded the reliability of the bulk system. New institutional arrangements and approaches to information management are needed. It was suggested that reliability practices caused the 2003 blackout, and not technical failures. Uncertainties in the restructured market were discussed, as well as incentives to maintain system adequacy. Examples of deregulation in other countries were presented. Organizational complexities were reviewed, including the Federal Energy Regulatory Commission's (FERC) requirements and the new layers of complexity that have been added to the decision-making process in the light of restructuring. Planning and connectivity issues were reviewed. The need for design standards in power grid control centres was discussed. Difficulties in collecting data from different control centres were considered. Issues concerning the lack of investment in research and development were discussed, with particular reference to the urgent need for coordinated research programs. The looming manpower crisis in the electric power industry was also discussed. Recommendations included ensuring that the transmission system can support a market structure; building a national reliability centre; solving the manpower crisis; and testing market designs before deploying them. It was concluded that good engineering design principles, including experimental economic testing, should be required of any new electricity market design before authorizing its use. 31 refs., 1 tab., 6 figs

  17. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Science.gov (United States)

    2010-04-01

    ... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.4 Funding of the Electric Reliability Organization. (a) Any... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  18. Reliability payments to generation capacity in electricity markets

    International Nuclear Information System (INIS)

    Olsina, Fernando; Pringles, Rolando; Larisson, Carlos; Garcés, Francisco

    2014-01-01

    Electric power is a critical input to modern economies. Generation adequacy and security of supply in power systems running under competition are currently topics of high concern for consumers, regulators and governments. In a market setting, generation investments and adequacy can only be achieved by an appropriate regulatory framework that sets efficient remuneration to power capacity. Theoretically, energy-only electricity markets are efficient and no additional mechanism is needed. Nonetheless, the energy-only market design suffers from serious drawbacks. Therefore, jointly with the evolution of electricity markets, many remunerating mechanisms for generation capacity have been proposed. Explicit capacity payment was the first remunerating approach implemented and perhaps still the most applied. However, this price-based regulation has been applied no without severe difficulties and criticism. In this paper, a new reliability payment mechanism is envisioned. Capacity of each generating unit is paid according to its effective contribution to overall system reliability. The proposed scheme has many attractive features and preserves the theoretical efficiency properties of energy-only markets. Fairness, incentive compatibility, market power mitigation and settlement rules are investigated in this work. The article also examines the requirements for system data and models in order to implement the proposed capacity mechanism. A numerical example on a real hydrothermal system serves for illustrating the practicability of the proposed approach and the resulting reliability payments to the generation units. - Highlights: • A new approach for remunerating supply reliability provided by generation units is proposed. • The contribution of each generating unit to lessen power shortfalls is determined by simulations. • Efficiency, fairness and incentive compatibility of the proposed reliability payment are assessed

  19. Reliability Electrical Power System of Hospital as Cold Standby System

    Directory of Open Access Journals (Sweden)

    Grabski Franciszek

    2016-07-01

    Full Text Available The probabilistic model of a hospital electrical power system consisting of mains, an emergency power system and the automatic transfer switch with the generator starter are discussed in this paper. The reliability model is semi-Markov process describing two different units renewable cold standby system and switch. The embedded Semi-Markov processes concept is applied for description of the system evolution. Time to failure of the system is represented by a random variable denoting the first passage time of the process from the given state to the subset of states. The appropriate theorems of the Semi-Markov processes theory allow us to evaluate the reliability function and some reliability characteristics.

  20. Basic Principles of Electrical Network Reliability Optimization in Liberalised Electricity Market

    Science.gov (United States)

    Oleinikova, I.; Krishans, Z.; Mutule, A.

    2008-01-01

    The authors propose to select long-term solutions to the reliability problems of electrical networks in the stage of development planning. The guide lines or basic principles of such optimization are: 1) its dynamical nature; 2) development sustainability; 3) integrated solution of the problems of network development and electricity supply reliability; 4) consideration of information uncertainty; 5) concurrent consideration of the network and generation development problems; 6) application of specialized information technologies; 7) definition of requirements for independent electricity producers. In the article, the major aspects of liberalized electricity market, its functions and tasks are reviewed, with emphasis placed on the optimization of electrical network development as a significant component of sustainable management of power systems.

  1. Alberta Advisory Council on Electricity report to the Alberta Minister of Energy

    International Nuclear Information System (INIS)

    2002-06-01

    This report presents the deliberations of the Alberta Advisory Council on Electricity regarding the restructuring of the electric power industry in the province of Alberta. Strategic issues affecting restructuring over the long term were considered with particular attention to small consumers. The long term vision (Vision 2012) for electric power restructuring is to promote efficient and competitive markets attracting investment and innovation that will result in fair and equitable prices for consumers. It was noted that while the restructuring system is currently in place, progress has not been even across the system. It is expected that it will take several years before a restructured electricity industry is fully functioning. Recommendations were presented to establish a plan to address issues regarding restructuring within power generation, transmission, distribution and export/import policies. The issue of market power, competitiveness and consumer education was also discussed. It was also noted that there are many external forces that impact the electricity system, many of which come from outside Alberta. These include fluctuations in gas prices, electricity demand, changes in the United States, regulatory decisions in other jurisdictions and unexpected business events. It was emphasized that a strong, liquid and competitive wholesale market is vital to achieving Vision 2012. Key factors for a competitive wholesale market include adequate generation, transmission capability and export/import capacity. The report presents the following 3 scenarios: business as usual, managed transition, and freedom 2012. A review of restructuring in several other jurisdictions around the world was also provided. 1 tab., 1 fig

  2. Highlights from the Electricity Sector Council's powerline technician project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-05-15

    The Electricity Sector Council completed a situational analysis of the powerline technician trade in Canada in April 2008. The purpose of the study was to provide industry partners with the opportunity to provide input into the development of the powerline trade; to assess the current workforce; to examine training and working conditions based on in-depth focus group interviews; and to demonstrate regional and provincial differences in apprenticeship development. This report presented highlights from the Electricity Sector Council's powerline technician project. Specifically, the report discussed the number of powerline apprentices entering the trade; regional differences in the powerline trade; and emerging practices for recruitment, retention, and training. Recommendations were also offered in order to address the challenges faced by the powerline trade. It was concluded that the best ways to recruit candidates in the powerline technician trade are to invest in a word-of mouth campaign, such as a coaching program; encourage early introduction to the trades through job sampling; offer financial incentives; and invest in outreach programs. 4 figs.

  3. Distribution reliability in the reformed New Zealand electricity industry

    International Nuclear Information System (INIS)

    McGlinchy, B. J.

    1997-01-01

    The process of deregulating the electric power industry in New Zealand, which began in 1984, and is now a fully competitive system, was described. The industry is not only fully competitive, but enjoys the distinction of being subject only to very light-handed regulation. The regulation requires each company within the industry to publish an annual financial statement, the rate of profit and some performance indicators including reliability indices. Companies also report on faults in lines and cables, and on a voluntary basis they contribute to a 'by cause' survey, using indicators developed by the Canadian Electricity Association. It is expected that the indices that will be developed from this data will be used as benchmarks for performance. The data could also be used for probability analysis in system expansion programs. 6 refs., 7 figs

  4. 18 CFR 375.303 - Delegations to the Director of the Office of Electric Reliability.

    Science.gov (United States)

    2010-04-01

    ... Director of the Office of Electric Reliability. 375.303 Section 375.303 Conservation of Power and Water... Delegations § 375.303 Delegations to the Director of the Office of Electric Reliability. The Commission... Electric Reliability Organization or Regional Entity rules or procedures; (ii) Reject an application...

  5. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Science.gov (United States)

    2010-04-01

    ... RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric... Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water...

  6. Potential for deserts to supply reliable renewable electric power

    Science.gov (United States)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  7. Thermal Management and Reliability of Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant

    2016-08-03

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil -- by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, and in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines will be presented.

  8. Thermal Management and Reliability of Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant

    2016-06-13

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil - by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, and in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines are presented.

  9. Decree No. 77-1233 of 10 November 1977 setting up a Council for information on nuclear electricity generation

    International Nuclear Information System (INIS)

    1977-01-01

    This Decree sets up a Council for information on nuclear electricity generation directly under the authority of and appointed by the Prime Minister. It has 18 members who include, inter alia, mayors of the communes concerned by nuclear power plant siting, representatives of nature and environmental protection associations, science academicians and economics, energy and communications experts. The Council's purpose is to ensure that the public has access to infomation on nuclear electricity generation from the technical, health, ecological, economic and financial viewpoints. It advises the Government on the public's conditions of access to information and proposes methods for its dissemination. (NEA) [fr

  10. Approach to valuing visual pollution from Western Electricity Production. [For Western Systems Coordinating Council area

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, L.E.

    1977-02-01

    This paper outlines an approach to valuing visual pollution from electric power plants. The differences between public-good pollution externalities, such as these aesthetic damages, and other market failures are discussed. Approaches generally used to value externalities are briefly described. The approach used relies heavily on an earlier application of bidding games to estimate people's willingness to pay for abatement of emissions from the Four Corners fossil-fuel power plant in northwestern New Mexico. The results of these surveys were used here to estimate the value of visual pollution from electric power plants for residents of and visitors to the Four Corners Air Quality Control Region, as a function of power plant emissions in that region. The approach presented here for the Four Corners region is structured so that replication for other air quality control regions is relatively easy. Preliminary results of this procedure for all of the air quality control regions in the Western Systems Coordinating Council area are presented. Visual pollution damages from electric power plants to residents of and recreational visitors to these western regions are estimated to total more than $100 million annually by 1985. These damages are expected to occur unless additional pollution controls are implemented, even if these subject populations do not increase.

  11. 78 FR 10169 - Federal Advisory Committee Act; Communications Security, Reliability, and Interoperability Council

    Science.gov (United States)

    2013-02-13

    ... Location Accuracy, Network Security Best Practices, DNSSEC Implementation Practices for ISPs, Secure BGP... FEDERAL COMMUNICATIONS COMMISSION Federal Advisory Committee Act; Communications Security... persons that the Federal Communications Commission's (FCC) Communications Security, Reliability, and...

  12. 76 FR 72922 - Federal Advisory Committee Act; Communications Security, Reliability, and Interoperability Council

    Science.gov (United States)

    2011-11-28

    ... alerting systems, 9-1-1 location accuracy, and network security. The FCC will attempt to accommodate as... FEDERAL COMMUNICATIONS COMMISSION Federal Advisory Committee Act; Communications Security... persons that the Federal Communications Commission's (FCC) third Communications Security, Reliability, and...

  13. Electric Power quality Analysis in research reactor: Impacts on nuclear safety assessment and electrical distribution reliability

    International Nuclear Information System (INIS)

    Touati, Said; Chennai, Salim; Souli, Aissa

    2015-01-01

    The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how well a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)

  14. Electric Power quality Analysis in research reactor: Impacts on nuclear safety assessment and electrical distribution reliability

    Energy Technology Data Exchange (ETDEWEB)

    Touati, Said; Chennai, Salim; Souli, Aissa [Nuclear Research Centre of Birine, Ain Oussera, Djelfa Province (Algeria)

    2015-07-01

    The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how well a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)

  15. Puget Sound Area Electric Reliability Plan : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, and during certain conditions, there is more demand for power in the Puget Sound area than the transmission system and existing generation can reliably supply. This high demand, called peak demand occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both.

  16. Nuclear electric propulsion operational reliability and crew safety study

    International Nuclear Information System (INIS)

    Karns, J.J.; Fragola, J.R.; Kahan, L.; Pelaccio, D.

    1993-01-01

    The central purpose of this analysis is to assess the ''achievability'' of a nuclear electric propulsion (NEP) system in a given mission. ''Achievability'' is a concept introduced to indicate the extent to which a system that meets or achieves its design goals might be implemented using the existing technology base. In the context of this analysis, the objective is to assess the achievability of an NEP system for a manned Mars mission as it pertains to operational reliability and crew safety goals. By varying design parameters, then examining the resulting system achievability, the design and mission risk drivers can be identified. Additionally, conceptual changes in design approach or mission strategy which are likely to improve overall achievability of the NEP system can be examined

  17. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Science.gov (United States)

    2010-01-01

    ... System (APS)—7, except Duquesne Light Company. 2. American Electric Power System (AEP)—entire AEP System... 10 Energy 4 2010-01-01 2010-01-01 false Electric regions-electric region groupings for reliability... of electric regions for use with regard to the Act. The regions are identified by FERC Power Supply...

  18. Electricity supply. Older plants' impact on reliability and air quality

    International Nuclear Information System (INIS)

    England-Joseph, Judy A.; Adams, Charles M.; Wood, David G.; Feehan, Daniel J.; Veal, Howard F.; Skeen, John H. III; Koenigs, Melvin J.; Lichtenfeld, David I.; Seretakis, Pauline J.

    1990-09-01

    Life extension of fossil fuel plants is a relatively recent phenomenon; thus, utilities have little experience to demonstrate the longer-term operating reliability of plants with an extended service life. While utility industry officials and government and industry studies express optimism that these plants will continue to operate reliably, the officials and the studies also caution that it is too soon to determine how pursuing life extension will affect the reliability of the nation's electricity supply. According to DOE, the number of fossil fuel generating units' 30 years old or older is expected to increase from about 2,500 in 1989 to roughly 3,700 in 1998, increasing such plants' share of overall generating capacity from 13 percent in 1989 to 27 percent in 1998. EPA estimates that with existing air quality requirements, fossil fuel plant emissions will increase steadily during the coming decade. Proposed acid rain control legislation, which would affect many plants that may have their service life extended, would require utilities to significantly reduce emissions by the year 2000 but would allow utilities flexibility in deciding how and where to achieve the reductions. If such legislation is enacted, utilities generally are expected to find reducing emissions from existing plants more cost-effective than replacing them and to continue extending plants' service life. Officials of DOE and utility organizations expressed concern, however, that EPA could decide, as it did for one plant in 1988, that alterations made in extending the service life of plants exempted from the Clean Air Act would result in increased emissions and thus cause the altered plants to lose their exemption. According to the officials, the additional costs of achieving the Clean Air Act's standards could discourage some life extension projects. However, such decisions by EPA could also reduce the nation's total power plant emissions by eliminating an existing incentive to retain exempt

  19. Consortium for Electric Reliability Technology Solutions Grid of the Future White Paper on Review of Recent Reliability Issues and Systems Events

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, John F.; Dagle, Jeffery E.

    1999-12-01

    This report is one of six reports developed under the U.S. Department of Energy (DOE) program in Power System Integration and Reliability (PSIR). The objective of this report is to review, analyze, and evaluate critical reliability issues demonstrated by recent disturbance events in the North America power system. Eleven major disturbances are examined, most occurring in this decade. The strategic challenge is that the pattern of technical need has persisted for a long period of time. For more than a decade, anticipation of market deregulation has been a major disincentive to new investments in system capacity. It has also inspired reduced maintenance of existing assets. A massive infusion of better technology is emerging as the final option to continue reliable electrical services. If an investment in better technology will not be made in a timely manner, then North America should plan its adjustments to a very different level of electrical service. It is apparent that technical operations staff among the utilities can be very effective at marshaling their forces in the immediate aftermath of a system emergency, and that serious disturbances often lead to improved mechanisms for coordinated operation. It is not at all apparent that such efforts can be sustained through voluntary reliability organizations in which utility personnel external to those organizations do most of the technical work. The eastern interconnection shows several situations in which much of the technical support has migrated from the utilities to the Independent System Operator (ISO), and the ISO staffs or shares staff with the regional reliability council. This process may be a natural and very positive consequence of utility restructuring. If so, the process should be expedited in regions where it is less advanced.

  20. The storage of electric energy: an unavoidable dimension of energy transition. Opinion of the Economic, Social and Environmental Council

    International Nuclear Information System (INIS)

    Obadia, Alain

    2015-01-01

    After a brief synthesis, the opinion of the Council is stated. It presents the main objectives of the storage of electric energy, its main physical-chemical principles and the available technologies (gravity, compressed air energy storage, electrochemical, thermal, electric, and inertial storage), and the three main techniques: pumped-storage hydroelectricity, batteries, hydrogen. Global assessment and recommendations are discussed, notably in terms of economic and financial consequences, but also in terms of technological choices, research and development, local development, industrial cooperation, and legal framework. Appendices notably present in detail the different technologies, the operation of the electric grid in France and Europe, and some experiments

  1. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    OpenAIRE

    Chassin, David P.; Posse, Christian

    2004-01-01

    The reliability of electric transmission systems is examined using a scale-free model of network structure and failure propagation. The topologies of the North American eastern and western electric networks are analyzed to estimate their reliability based on the Barabasi-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using s...

  2. Puget Sound area electric reliability plan: Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin

  3. 76 FR 23801 - North American Electric Reliability Corporation; Order Approving Reliability Standard

    Science.gov (United States)

    2011-04-28

    ... have an operating plan and facilities for backup functionality to ensure Bulk-Power System reliability... entity's primary control center on the reliability of the Bulk-Power System. \\1\\ Mandatory Reliability... potential impact of a violation of the Requirement on the reliability of the Bulk-Power System. The...

  4. Bayesian approach in the power electric systems study of reliability ...

    African Journals Online (AJOL)

    Keywords: Reliability - Power System - Bayes Theorem - Weibull Model - Probability. ... ensure a series of estimated parameter (failure rate, mean time to failure, function .... only on random variable r.v. describing the operating conditions: ..... Multivariate performance reliability prediction in real-time, Reliability Engineering.

  5. Reliability Prediction Approaches For Domestic Intelligent Electric Energy Meter Based on IEC62380

    Science.gov (United States)

    Li, Ning; Tong, Guanghua; Yang, Jincheng; Sun, Guodong; Han, Dongjun; Wang, Guixian

    2018-01-01

    The reliability of intelligent electric energy meter is a crucial issue considering its large calve application and safety of national intelligent grid. This paper developed a procedure of reliability prediction for domestic intelligent electric energy meter according to IEC62380, especially to identify the determination of model parameters combining domestic working conditions. A case study was provided to show the effectiveness and validation.

  6. Reliability Assessment of Wind Farm Electrical System Based on a Probability Transfer Technique

    Directory of Open Access Journals (Sweden)

    Hejun Yang

    2018-03-01

    Full Text Available The electrical system of a wind farm has a significant influence on the wind farm reliability and electrical energy yield. The disconnect switch installed in an electrical system cannot only improve the operating flexibility, but also enhance the reliability for a wind farm. Therefore, this paper develops a probabilistic transfer technique for integrating the electrical topology structure, the isolation operation of disconnect switch, and stochastic failure of electrical equipment into the reliability assessment of wind farm electrical system. Firstly, as the traditional two-state reliability model of electrical equipment cannot consider the isolation operation, so the paper develops a three-state reliability model to replace the two-state model for incorporating the isolation operation. In addition, a proportion apportion technique is presented to evaluate the state probability. Secondly, this paper develops a probabilistic transfer technique based on the thoughts that through transfer the unreliability of electrical system to the energy transmission interruption of wind turbine generators (WTGs. Finally, some novel indices for describing the reliability of wind farm electrical system are designed, and the variance coefficient of the designed indices is used as a convergence criterion to determine the termination of the assessment process. The proposed technique is applied to the reliability assessment of a wind farm with the different topologies. The simulation results show that the proposed techniques are effective in practical applications.

  7. 78 FR 38851 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Science.gov (United States)

    2013-06-28

    ... either: Provide little protection for Bulk-Power System reliability or are redundant with other aspects... for retirement either: (1) Provide little protection for Bulk-Power System reliability or (2) are... to assure reliability of the Bulk-Power System and should be withdrawn. We have identified 41...

  8. Measuring international electricity integration: a comparative study of the power systems under the Nordic Council, MERCOSUR, and NAFTA

    International Nuclear Information System (INIS)

    Pineau, P.-O.; Hira, Anil; Froschauer, Karl

    2004-01-01

    Many regions of the world feel the pressure to interconnect electric power systems internationally. Regional integrations of the electricity sector have become part of free trade and common market initiatives, though the steps individual national jurisdictions take towards developing integrated systems vary. In this article, we review three regions concerned with common market initiatives and at different stages of integration processes that involve infrastructural, regulatory, and commercial decisions. First, we examine the North European countries in the Nordic Council, then countries in the Southern Cone of South America in MERCOSUR, and finally Mexico, the United States and Canada, linked under NAFTA. This comparative study highlights the potential, but also the many hurdles, that electricity sector integrations face. The study suggests a framework for measuring the level of electricity sector integration that could be applied to other regions

  9. Can Slovakia secure reliable electricity supply without nuclear?

    International Nuclear Information System (INIS)

    Pnacek, I.

    2004-01-01

    In this presentation author deals with structure of electricity production in the Slovak republic in 2006 and perspectives of electricity supply up to 2020 year. Decommissioning of Unit 1 and Unit 2 of the Bohunice NPP and completion of Unit 3 and 4 of the Mochovce NPP are discussed

  10. Advisory Council on Electricity report and recommendations on consumers concern : report to the Alberta Minister of Energy

    International Nuclear Information System (INIS)

    Bolger, L.F.

    2003-09-01

    This report presents a set of recommendations to help the Alberta government and industry address consumer concerns regarding electricity issues. It examined whether the restructuring process is working as planned and presented ways to move forward to create certainty in the marketplace, competitive prices, an adequate supply of electricity, and fair treatment for all consumers. Consumers are currently concerned about the following key electricity issues: higher electricity prices in some parts of Alberta; billing practices of utility companies; fairness of all line items on bills; consumer accessibility to competitive market options; long-range forecasts for consumer prices; current and future benefits of deregulation for consumers; and, the impact of government and Alberta Energy and Utilities Board decisions on consumer prices. The Council recommends that consumer education be expanded; a consumer ombudsman be established; markets be allowed to operate; and that billing practices and customer satisfaction be improved. The Council also suggests that the impact of flow-through regulated rate tariff be reviewed on an ongoing basis. It also recommends that the progress in the retail mass market be monitored and that the impact of change in some parts of the province be mitigated

  11. Bulk electric system reliability evaluation incorporating wind power and demand side management

    Science.gov (United States)

    Huang, Dange

    Electric power systems are experiencing dramatic changes with respect to structure, operation and regulation and are facing increasing pressure due to environmental and societal constraints. Bulk electric system reliability is an important consideration in power system planning, design and operation particularly in the new competitive environment. A wide range of methods have been developed to perform bulk electric system reliability evaluation. Theoretically, sequential Monte Carlo simulation can include all aspects and contingencies in a power system and can be used to produce an informative set of reliability indices. It has become a practical and viable tool for large system reliability assessment technique due to the development of computing power and is used in the studies described in this thesis. The well-being approach used in this research provides the opportunity to integrate an accepted deterministic criterion into a probabilistic framework. This research work includes the investigation of important factors that impact bulk electric system adequacy evaluation and security constrained adequacy assessment using the well-being analysis framework. Load forecast uncertainty is an important consideration in an electrical power system. This research includes load forecast uncertainty considerations in bulk electric system reliability assessment and the effects on system, load point and well-being indices and reliability index probability distributions are examined. There has been increasing worldwide interest in the utilization of wind power as a renewable energy source over the last two decades due to enhanced public awareness of the environment. Increasing penetration of wind power has significant impacts on power system reliability, and security analyses become more uncertain due to the unpredictable nature of wind power. The effects of wind power additions in generating and bulk electric system reliability assessment considering site wind speed

  12. Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

    Energy Technology Data Exchange (ETDEWEB)

    Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

    2014-02-24

    This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to

  13. Assessment and Improving Methods of Reliability Indices in Bakhtar Regional Electricity Company

    Directory of Open Access Journals (Sweden)

    Saeed Shahrezaei

    2013-04-01

    Full Text Available Reliability of a system is the ability of a system to do prospected duties in future and the probability of desirable operation for doing predetermined duties. Power system elements failures data are the main data of reliability assessment in the network. Determining antiseptic parameters is the goal of reliability assessment by using system history data. These parameters help to recognize week points of the system. In other words, the goal of reliability assessment is operation improving and decreasing of the failures and power outages. This paper is developed to assess reliability indices of Bakhtar Regional Electricity Company up to 1393 and the improving methods and their effects on the reliability indices in this network. DIgSILENT Power Factory software is employed for simulation. Simulation results show the positive effect of improving methods in reliability indices of Bakhtar Regional Electricity Company.

  14. Bayesian approach in the power electric systems study of reliability ...

    African Journals Online (AJOL)

    Subsequently, Bayesian methodologies are framed in an ampler problem list, based on the definition of an opportune "vector of state" and of a vector describing the system performances, aiming to the definition and the calculation or the estimation of system reliability. The purpose of our work is to establish a useful model ...

  15. Engineering and Design: Reliability Analysis of Navigation Lock and Dam Mechanical and Electrical Equipment

    National Research Council Canada - National Science Library

    Beranek, Dwight

    2001-01-01

    This engineer technical letter (ETL) provides guidance for assessing the reliability of mechanical and electrical systems of navigation locks and dams and for establishing an engineering basis for major rehabilitation investment decisions...

  16. Electricity distribution. Price control, reliability and customer services: response to OFFER

    International Nuclear Information System (INIS)

    1994-02-01

    This document presents the views of the National Consumer Council to a recent consultation paper from OFFER, the body responsible for regulation of the United Kingdom electric power industry. The financial performance of the Regional Electricity Companies (RECs) is reviewed by examining how it relates to the prices paid by domestic consumers. A critical analysis is presented of OFFER's notion of the revision of the existing price control mechanism for the distribution businesses within the RECs. Standards of performance, debt and consumer disconnection are also examined. (UK)

  17. Industrial plant electrical systems: Simplicity, reliability, cost savings, redundancies

    International Nuclear Information System (INIS)

    Silvestri, A.; Tommazzolli, F.; Pavia Univ.

    1992-01-01

    This article represents a compact but complete design and construction manual for industrial plant electrical systems. It is to be used by design engineers having prior knowledge of local power supply routes and voltages and regards principally the optimum choice of internal distribution systems which can be radial or single, double ringed or with various network configurations, and with single or multiple supplies, and many or few redundancies. After giving guidelines on the choosing of these options, the manual deals with problematics relevant to suitable cable sizing. A cost benefit benefit analysis method is suggested for the choice of the number of redundancies. Recommendations are given for the choice of transformers, motorized equipment, switch boards and circuit breakers. Reference is made to Italian electrical safety and building codes

  18. The integrated North American electricity market : a bi-national model for securing a reliable supply of electricity

    International Nuclear Information System (INIS)

    Egan, T.

    2004-03-01

    The 50 million people who experienced the power blackout on August 14, 2003 in southern Ontario and the U.S. Midwest and Northeast understood how vital electricity is in our day-to-day lives, but they also saw the resiliency of the North American electricity system. More than 65 per cent of the power generation was restored to service within 12 hours and no damage was caused to the generation or transmission facilities. Although the interconnected North American electricity system is among the most reliable in the world, it is threatened by an aging infrastructure, lack of new generation and transmission to meet demand, and growing regulatory pressures. This report suggests that any measures that respond to the threat of ongoing reliability should be bi-national in scope due to the interconnected nature of the system. Currently, the market, regulatory and administrative systems are different in each country. The full engagement and cooperation of both Canada and the United States is important to ensure future cross-border trade and power reliability. The Canadian Electricity Association proposes the following 7 measures: (1) support an open debate on all the supply options available to meet growing power demands, (2) promote bi-national cooperation in the construction of new transmission capacity to ensure a reliable continental electricity system, (3) examine opportunities for bi-national cooperation for investment in advanced transmission technologies and transmission research and development, (4) promote new generation technology and demand-side measures to relieve existing transmission constraints and reduce the need for new transmission facilities, (5) endorse a self-governing international organization for developing and enforcing mandatory reliability standards for the electricity industry, (6) coordinate measures to promote critical infrastructure protection, and (7) harmonize U.S. and Canadian efforts to streamline or clarify regulation of electricity

  19. Reliability of copper based alloys for electric resistance spot welding

    International Nuclear Information System (INIS)

    Jovanovicj, M.; Mihajlovicj, A.; Sherbedzhija, B.

    1977-01-01

    Durability of copper based alloys (B-5 and B-6) for electric resistance spot-welding was examined. The total amount of Be, Ni and Zr was up to 2 and 1 wt.% respectively. Good durability and satisfactory quality of welded spots were obtained in previous laboratory experiments carried out on the fixed spot-welding machine of an industrial type (only B-5 alloy was examined). Electrodes made of both B-5 and B-6 alloy were tested on spot-welding grips and fixed spot-welding machines in Tvornica automobila Sarajevo (TAS). The obtained results suggest that the durability of electrodes made of B-5 and B-6 alloys is more than twice better than of that used in TAS

  20. 78 FR 803 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2013-01-04

    ... Bulk 74. Electric System 1. Inclusion I1 (Transformers) 75. Commission Determination 80. 2. Inclusion... configurations are included in the bulk electric system. Inclusions: I1--Transformers with the primary terminal... bulk electric system. 15. NERC explained that inclusion I1 includes transformers with the primary...

  1. Using VIIRS Day/Night Band to Measure Electricity Supply Reliability: Preliminary Results from Maharashtra, India

    Directory of Open Access Journals (Sweden)

    Michael L. Mann

    2016-08-01

    Full Text Available Unreliable electricity supplies are common in developing countries and impose large socio-economic costs, yet precise information on electricity reliability is typically unavailable. This paper presents preliminary results from a machine-learning approach for using satellite imagery of nighttime lights to develop estimates of electricity reliability for western India at a finer spatial scale. We use data from the Visible Infrared Imaging Radiometer Suite (VIIRS onboard the Suomi National Polar Partnership (SNPP satellite together with newly-available data from networked household voltage meters. Our results point to the possibilities of this approach as well as areas for refinement. With currently available training data, we find a limited ability to detect individual outages identified by household-level measurements of electricity voltage. This is likely due to the relatively small number of individual outages observed in our preliminary data. However, we find that the approach can estimate electricity reliability rates for individual locations fairly well, with the predicted versus actual regression yielding an R2 > 0.5. We also find that, despite the after midnight overpass time of the SNPP satellite, the reliability estimates derived are representative of daytime reliability.

  2. Assessing Changes in the Reliability of the U.S. Electric Power System

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Stanford Univ., CA (United States). Dept. of Physics; LaCommare, Kristina H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sweeney, James L. [Stanford Univ., CA (United States)

    2015-08-01

    Over the past 15 years, the most well-publicized efforts to assess trends in U.S. electric power system reliability have focused only on a subset of all power interruption events (see, for example, Amin 2008 and Campbell 2012)—namely, only the very largest events, which trigger immediate emergency reporting to federal agencies and industry regulators. Anecdotally, these events are thought by many to represent no more than 10% of the power interruptions experienced annually by electricity consumers. Moreover, a review of these emergency reports has identified shortcomings in relying on these data as reliable sources for assessing trends, even with the reliability events they report (Fisher et al. 2012). Recent work has begun to address these limitations by examining trends in reliability data collected annually by electricity distribution companies (Eto et al. 2012). In principle, all power interruptions experienced by electricity customers, regardless of size, are recorded by the distribution utility. Moreover, distribution utilities have a long history of recording this information, often in response to mandates from state public utility commissions (Eto et al. 2006). Thus, studies that rely on reliability data collected by distribution utilities can, in principle, provide a more complete basis upon which to assess trends or changes in reliability over time.

  3. OPTIMIZATION OF THE RELIABILITY OF AGRICULTURAL CONSUMERS ELECTRICITY DISTRIBUTING AND SUPPLY SYSTEMS

    Directory of Open Access Journals (Sweden)

    Lupushor I.

    2007-12-01

    Full Text Available The problems of the optimization reliability in electrical networks of the different class of voltage have probabilistic nature, they discretely change and depend on the number of factors both definite and indefinite and have importance by selection of electric equipment, graph of development of electrical networks and voltage levels. The definition of the major factors, which have determining significance on their value and speed of their change allow to elaborate methods of their optimization and to elaborate effective methods of their growth limitation in electrical networks with the different class of voltage.

  4. Small nuclear power reactor emergency electric power supply system reliability comparative analysis

    International Nuclear Information System (INIS)

    Bonfietti, Gerson

    2003-01-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  5. Título da página electrónica: International Risk Governance Council

    Directory of Open Access Journals (Sweden)

    Pedro Pinto dos Santos

    2012-12-01

    Full Text Available O International Risk Governance Council (IRGC é uma organização independente cuja missão é ajudar a compreender e a gerir riscos globais emergentes que têm impacto na segurança, saúde humana, ambiente, economia e na sociedade. O IRGC focaliza a sua acção no desenvolvimento de conceitos e estratégias de governação do risco, sendo esta uma área crucial perante a necessidade de tomar decisões relacionadas com o risco e de conseguir uma maximização da confiança das comunidades nos processos e na...

  6. Reliability of solid-state lighting electrical drivers subjected to WHTOL accelerated aging

    Energy Technology Data Exchange (ETDEWEB)

    Lall, Pradeep; Sakalauku, Peter; Davis, Lynn

    2014-05-27

    An investigation of a solid-state lighting (SSL) luminaire with the focus on the electronic driver which has been exposed to a standard wet hot temperature operating life (WHTOL) of 85% RH and 85°C in order to assess reliability of prolonged exposer to a harsh environment has been conducted. SSL luminaires are beginning introduced as head lamps in some of today's luxury automobiles and may also be fulfilling a variety of important outdoor applications such as overhead street lamps, traffic signals and landscape lighting. SSL luminaires in these environments are almost certain to encounter excessive moisture from humidity and high temperatures for a persistent period of time. The lack of accelerated test methods for LEDs to assess long-term reliability prior to introduction into the marketplace, a need for SSL physics based PHM modeling indicators for assessment and prediction of LED life, as well as the U.S. Department of Energy's R&D roadmap to replace todays lighting with SSL luminaires makes it important to increase the understanding of the reliability of SSL devices, specifically, in harsh environment applications. In this work, a set of SSL electrical drivers were investigated to determine failure mechanisms that occur during prolonged harsh environment applications. Each driver consists of four aluminum electrolytic capacitors (AECs) of three different types and was considered the weakest component inside the SSL electrical driver. The reliability of the electrical driver was assessed by monitoring the change in capacitance and the change in equivalent series resistance for each AEC, as well as monitoring the luminous flux of the SSL luminaire or the output of the electrical driver. The luminous flux of a pristine SSL electrical driver was also monitored in order to detect minute changes in the electrical drivers output and to aid in the investigation of the SSL luminaires reliability. The failure mechanisms of the electrical drivers have been

  7. Reliability Assessment of Offshore Wind Turbines Considering Faults of Electrical / Mechanical Components

    DEFF Research Database (Denmark)

    Kostandyan, Erik; Sørensen, John Dalsgaard

    2013-01-01

    For offshore wind turbines, the cost contribution to Cost of Energy from inspections and Operation & Maintenance can be substantial, and can be expected to increase when wind farms are placed at deeper water depths, further from the coast and in more harsh environments. Estimates of the reliability...... is considered and related to reliability estimation by taking into account faults e.g. due to failure of an electrical component or loss of grid....

  8. Flexibility and reliability in long-term planning exercises dedicated to the electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Maizi, Nadia; Drouineau, Mathilde; Assoumou, Edi; Mazauric, Vincent

    2010-09-15

    Long-term planning models are useful to build plausible options for future energy systems and must consequently address the technological feasibility and associated cost of these options. This paper focuses on the electricity sector and on problems of flexibility and reliability in power systems in order to improve results provided by long-term planning exercises: flexibility needs are integrated as an additional criterion for new investment decisions and, reliability requirements are assessed through the level of electrical losses they induced and a related cost. These approaches are implemented in a long-term planning model and demonstrated through a study of the Reunion Island.

  9. Analysis of performance reliability of electrical and electronic equipment of car-tractor

    Directory of Open Access Journals (Sweden)

    Kravchenko О.Р.

    2016-08-01

    Full Text Available The analysis of the operational reliability of electrical and electronic equipment of vehicles, trucks Mercedes-Benz Actros 1844 LS and Volvo FH 1242, conducting international cargo transportation is performed. It is established that the equipment is reliable, which meets modern requirements, but where there is a violation of the resolution. The reason for repair work is constructive and operational factors. Distribution of efficiency and overall performance of operational reliability is retrieved. Items with more bounce are found. Common factors of violation of efficiency cars, trucks in operation, are largely different stages in warranty runs are obtained.

  10. Interim report of the supply/demand committee in Electric Enterprises Council

    International Nuclear Information System (INIS)

    1982-01-01

    Following a similar report made two odd years ago, an interim report was presented concerning the outlook of electric power demand and the development target for fiscal 1990, and also the electric power demand in the year 2000 to indicate the future direction. During the past two years, the energy situation both domestic and abroad has largely changed, including energy saving practice, petroleum substitute development, etc. The aggregate demand of electric power in fiscal 1990 was estimated at 795,000 million kwh, up about 4.3 % yearly from that in fiscal 1980. The target for nuclear power generation in fiscal 1990 was put at 46 million kw (22.0 % of the total power capacity). Then in the year 2000, the nuclear power generation in terms of capacity will be about 30 % of the aggregate total. (Mori, K.)

  11. Factors influencing the reliability of non-electric detonating circuit in underground uranium mines and preventive measures of misfiring

    International Nuclear Information System (INIS)

    Li Qin

    2010-01-01

    Characteristics of non-electric detonating circuit are introduced. The main factors influencing the reliability of non-electric detonating circuit are described. Taking an underground blasting of a uranium mine for example, the reliability of various kinds of detonating network system is calculated using the reliability theory and numerical analysis method. The reasons that cause the misfiring in non-electric detonating circuit system are analyzed, and preventive measures are put forward.(authors)

  12. The development of the Czech Republic electric industry - Reliable, safe and responsible source mix

    Energy Technology Data Exchange (ETDEWEB)

    Vrba, Miroslav; Jez, Jiri; Ptacek, Jiri

    2010-09-15

    The paper focuses on the development of the Czech Republic electric industry in close perspective and the prediction of its expected future in period up to 2030. The goal of the paper is to specify methods and procedures applied within periodic assessment of Czech electric power sector balance outlook for the State authorities. A necessity to respect economic recession and politicization of the issue of power sector development has invoked that these items are added to commonly used procedures. A key criterion is the reliable and safe electricity supply by adequate source mix for acceptable prices and environmental aspects.

  13. Reliability

    OpenAIRE

    Condon, David; Revelle, William

    2017-01-01

    Separating the signal in a test from the irrelevant noise is a challenge for all measurement. Low test reliability limits test validity, attenuates important relationships, and can lead to regression artifacts. Multiple approaches to the assessment and improvement of reliability are discussed. The advantages and disadvantages of several different approaches to reliability are considered. Practical advice on how to assess reliability using open source software is provided.

  14. Reliable CPS design for mitigating semiconductor and battery aging in electric vehicles

    NARCIS (Netherlands)

    Chang, W.; Proebstl, A.; Goswami, D.; Zamani, M.; Chakraborty, S.

    2015-01-01

    Reliability and performance of cyber-physical systems (CPS) in electric vehicles (EVs) are influenced by three design aspects: (i) controller design, (ii) battery usage, i.e., Battery rate capacity and aging effects, (iii) processor aging of the in-vehicle embedded platform. In this paper, we

  15. Estimated Value of Service Reliability for Electric Utility Customers in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, M.J.; Mercurio, Matthew; Schellenberg, Josh

    2009-06-01

    Information on the value of reliable electricity service can be used to assess the economic efficiency of investments in generation, transmission and distribution systems, to strategically target investments to customer segments that receive the most benefit from system improvements, and to numerically quantify the risk associated with different operating, planning and investment strategies. This paper summarizes research designed to provide estimates of the value of service reliability for electricity customers in the US. These estimates were obtained by analyzing the results from 28 customer value of service reliability studies conducted by 10 major US electric utilities over the 16 year period from 1989 to 2005. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods it was possible to integrate their results into a single meta-database describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the US for industrial, commercial, and residential customers. Estimated interruption costs for different types of customers and of different duration are provided. Finally, additional research and development designed to expand the usefulness of this powerful database and analysis are suggested.

  16. 77 FR 59745 - Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation...

    Science.gov (United States)

    2012-10-01

    ...; Order No. 766] Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation... rule. SUMMARY: The Commission is issuing this Final Rule to revise its delegations of authority to... delegation agreements, and ERO policies and procedures. DATES: This rule is effective October 1, 2012. FOR...

  17. R&D program benefits estimation: DOE Office of Electricity Delivery and Energy Reliability

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-12-04

    The overall mission of the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE) is to lead national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure, and facilitate recovery from disruptions to the energy supply. In support of this mission, OE conducts a portfolio of research and development (R&D) activities to advance technologies to enhance electric power delivery. Multiple benefits are anticipated to result from the deployment of these technologies, including higher quality and more reliable power, energy savings, and lower cost electricity. In addition, OE engages State and local government decision-makers and the private sector to address issues related to the reliability and security of the grid, including responding to national emergencies that affect energy delivery. The OE R&D activities are comprised of four R&D lines: High Temperature Superconductivity (HTS), Visualization and Controls (V&C), Energy Storage and Power Electronics (ES&PE), and Distributed Systems Integration (DSI).

  18. 78 FR 26349 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Science.gov (United States)

    2013-05-06

    ... Standards Oversight and Technology Committee Meetings Sheraton Boston Hotel, 39 Dalton Street, Boston, MA, 02199. May 8 (7:00 a.m.-5:00 p.m.) and May 9 (8:00 a.m.-1:00 p.m.), 2013 Further information regarding... American Electric Reliability Corporation For further information, please contact Jonathan First, 202-502...

  19. Evaluation of conventional electric power generating industry quality assurance and reliability practices

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.T.; Lauffenburger, H.A.

    1981-03-01

    The techniques and practices utilized in an allied industry (electric power generation) that might serve as a baseline for formulating Quality Assurance and Reliability (QA and R) procedures for photovoltaic solar energy systems were studied. The study results provide direct near-term input for establishing validation methods as part of the SERI performance criteria and test standards development task.

  20. Reliability of supply in competitive electricity markets: The Nordic electricity Market

    International Nuclear Information System (INIS)

    Singh, Balbir

    2005-12-01

    An overview of the current regulation and performance of the network utilities with respect to the reliability of supply across Europe in general indicates wide variation. On the regional level the situation in the Nordic market is no exception. Can the variation in reliability of supply in Nordic region be explained by differences in regulatory frameworks in the Nordic countries and is it possible to draw any best practice lessons for other countries and regions? The Norwegian regulation and performance with respect to reliability criterion is encouraging, however it must be emphasized that the Norwegian experience with reliability regulation in its current form covers a period of 3 years, a period that is too short to evaluate the Norwegian model. A closer examination of the Norwegian model reveals dynamic trade off in reliability performance, which if permanent may endanger the reliability of supply in the long-run. Last, but not the least important is the criterion that choice of regulation should be based on a careful social cost-benefit analysis of the regulatory model where both cost incurred by the regulatory agencies and the compliance costs incurred by the regulated utilities are included. A preliminary analysis of regulatory agencies in the Nordic market indicates that Norwegian model of network regulation is quite resource incentive. While it is premature to draw conclusions about the national regulatory mechanisms, the Nordic cross border regulation through voluntary arrangements under the auspices of NORDEL provides a good example of an arrangement that is useful when implementation of a formal regulatory regime across different jurisdiction is not possible

  1. Increasing the reliability of electric energy supply to consumers in ROMAG-PROD Heavy Water Plant

    International Nuclear Information System (INIS)

    Barta, Ioan; Hanes, Marian . E-mail electrica@romag.ro

    2004-01-01

    Full text: This work aims at achieving an analysis of time evolution of the status of electrical installations, their performances and reliability, at describing the refurbishment measures adopted, at assessing the efficiency of these measures and also to suggest solutions for improving the reliability in the electric energy supply of ROMAG-PROD Heavy Water Plant. The analysis started from the original design, the manner the electrical installations were mounted, the technological level of this equipment and gives an evaluation of the deficiencies and the evolution of incidents occurred during the operation period. On the basis of the experience gathered one advances new items for equipment renewing and refurbishment of electric installations which together with the existing ones would ensure an electric energy supply more secure and efficient, leading directly to a more safe and efficient operation of the ROMAG-PROD Heavy Water Plant. In this work the incidents of electric energy nature which occurred are analyzed, the equipment which generated events identified and measures to solve these problems proposed

  2. ASCERTAINMENT OF ELECTRIC-SUPPLY SCHEMES RELIABILITY FOR THE ATOMIC POWER PLANT AUXILIARIES

    Directory of Open Access Journals (Sweden)

    A. L. Starzhinskij

    2015-01-01

    Full Text Available The paper completes ascertainment of electrical-supply scheme reliability for the auxiliaries of a nuclear power plant. Thereat the author considers the system behavior during the block normal operation, carrying out current maintenance, and capital repairs in combination with initiating events. The initiating events for reactors include complete blackout, i.e. the loss of outside power supply (normal and reserve; emergency switching one of the working turbogenerators; momentary dumping the normal rating to the level of auxiliaries with seating the cutout valve of one turbo-generator. The combination of any initiating event with the repairing mode in case of one of the system elements failure should not lead to blackout occurrence of more than one system of the reliable power supply. This requirement rests content with the help of the reliable power supply system self-dependence (electrical and functional and the emergency power-supply operational autonomy (diesel generator and accumulator batteries.The reliability indicators of the power supply system for the nuclear power plant auxiliaries are the conditional probabilities of conjoined blackout of one, two, and three sections of the reliable power supply conditional upon an initiating event emerging and the blackout of one, two, and three reliable power-supply sections under the normal operational mode. Furthermore, they also are the blackout periodicity of one and conjointly two, three, and four sections of normal operation under the block normal operational mode. It is established that the blackout of one bus section of normal operation and one section of reliable power-supply system of the auxiliaries that does not lead to complete blackout of the plant auxiliaries may occur once in three years. The probability of simultaneous power failure of two or three normal-operation sections and of two reliable power-supply sections during the power plant service life is unlikely.

  3. How reliably can climate change and mitigation policy impacts on electric utilities be assessed?

    International Nuclear Information System (INIS)

    Dowlatabadi, H.; Kopp, R.J.; Palmer, K.; De Witt, D.

    1993-01-01

    Numerous mechanisms link climate change and electric utilities. Electricity generation releases radiatively active trace substances (RATS). Significant changes in atmospheric concentration of RATS can lead to a change in regional and global climate regimes. Mitigation action designed to prevent or limit climate change is possible through curbing emissions. Climate change and related mitigation actions impact on electric utilities. Foresight in electric utility planning requires reliable predictions of how the utilities may be affected in the decades ahead. In this paper the impacts of climate change and mitigation policies are noted, and our ability to assess these is reviewed. To this end a suite of models exploring supply and demand questions have been developed. The overall conclusion of the study is that the demand-side uncertainties dominate other unknowns and need to be better characterized and understood. (author)

  4. Electricity consumers' council statement of case to the Sizewell 'B' power station public inquiry

    International Nuclear Information System (INIS)

    Barnes, M.

    1983-01-01

    Of the four arguments used in favour of Sizewell, the ECC considers that the economic benefit case is much the most important. Consumers will need to be convinced above all that Sizewell will help to restrain the growth of electricity prices. Of the other three arguments, plant need is not taken very seriously by the Board, making provision for future investment options hardly appears in the Statement of Case, and fuel diversity - while an important objective - can only be examined properly within the context of long-term investment strategy and relates only marginally to Sizewell as a self-standing project. Because a decision about Sizewell can in any case only be fully evaluated within the context of long-term plant strategy, the ECC has also briefly considered the most important long-term issues - the existence or otherwise of a nuclear programme, the questions surrounding technology acquisition and alternative energy investments - against which the Sizewell decision should be viewed. (author)

  5. State Electricity Regulatory Policy and Distributed Resources: Distributed Resources and Electric System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Cowart, R.; Harrington, C.; Moskovitz, D.; Shirley, W.; Weston, F.; Sedano, R.

    2002-10-01

    Designing and implementing credit-based pilot programs for distributed resources distribution is a low-cost, low-risk opportunity to find out how these resources can help defer or avoid costly electric power system (utility grid) distribution upgrades. This report describes implementation options for deaveraged distribution credits and distributed resource development zones. Developing workable programs implementing these policies can dramatically increase the deployment of distributed resources in ways that benefit distributed resource vendors, users, and distribution utilities. This report is one in the State Electricity Regulatory Policy and Distributed Resources series developed under contract to NREL (see Annual Technical Status Report of the Regulatory Assistance Project: September 2000-September 2001, NREL/SR-560-32733). Other titles in this series are: (1) Accommodating Distributed Resources in Wholesale Markets, NREL/SR-560-32497; (2) Distributed Resources and Electric System Re liability, NREL/SR-560-32498; (3) Distribution System Cost Methodologies for Distributed Generation, NREL/SR-560-32500; (4) Distribution System Cost Methodologies for Distributed Generation Appendices, NREL/SR-560-32501.

  6. Reliability measurement for mixed mode failures of 33/11 kilovolt electric power distribution stations.

    Directory of Open Access Journals (Sweden)

    Faris M Alwan

    Full Text Available The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter [Formula: see text] and shape parameters [Formula: see text] and [Formula: see text]. Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models.

  7. Scoping study on trends in the economic value of electricity reliability to the U.S. economy; TOPICAL

    International Nuclear Information System (INIS)

    Eto, Joseph; Koomey, Jonathan; Lehman, Bryan; Martin, Nathan; Mills, Evan; Webber, Carrie; Worrell, Ernst

    2001-01-01

    During the past three years, working with more than 150 organizations representing public and private stakeholders, EPRI has developed the Electricity Technology Roadmap. The Roadmap identifies several major strategic challenges that must be successfully addressed to ensure a sustainable future in which electricity continues to play an important role in economic growth. Articulation of these anticipated trends and challenges requires a detailed understanding of the role and importance of reliable electricity in different sectors of the economy. This report is intended to contribute to that understanding by analyzing key aspects of trends in the economic value of electricity reliability in the U.S. economy. We first present a review of recent literature on electricity reliability costs. Next, we describe three distinct end-use approaches for tracking trends in reliability needs: (1) an analysis of the electricity-use requirements of office equipment in different commercial sectors; (2) an examination of the use of aggregate statistical indicators of industrial electricity use and economic activity to identify high reliability-requirement customer market segments; and (3) a case study of cleanrooms, which is a cross-cutting market segment known to have high reliability requirements. Finally, we present insurance industry perspectives on electricity reliability as an example of a financial tool for addressing customers' reliability needs

  8. Scoping study on trends in the economic value of electricity reliability to the U.S. economy

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph; Koomey, Jonathan; Lehman, Bryan; Martin, Nathan; Mills, Evan; Webber, Carrie; Worrell, Ernst

    2001-06-01

    During the past three years, working with more than 150 organizations representing public and private stakeholders, EPRI has developed the Electricity Technology Roadmap. The Roadmap identifies several major strategic challenges that must be successfully addressed to ensure a sustainable future in which electricity continues to play an important role in economic growth. Articulation of these anticipated trends and challenges requires a detailed understanding of the role and importance of reliable electricity in different sectors of the economy. This report is intended to contribute to that understanding by analyzing key aspects of trends in the economic value of electricity reliability in the U.S. economy. We first present a review of recent literature on electricity reliability costs. Next, we describe three distinct end-use approaches for tracking trends in reliability needs: (1) an analysis of the electricity-use requirements of office equipment in different commercial sectors; (2) an examination of the use of aggregate statistical indicators of industrial electricity use and economic activity to identify high reliability-requirement customer market segments; and (3) a case study of cleanrooms, which is a cross-cutting market segment known to have high reliability requirements. Finally, we present insurance industry perspectives on electricity reliability as an example of a financial tool for addressing customers' reliability needs.

  9. Thermal Management and Reliability of Automotive Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant V [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bennion, Kevin S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cousineau, Justine E [National Renewable Energy Laboratory (NREL), Golden, CO (United States); DeVoto, Douglas J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Feng, Xuhui [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kekelia, Bidzina [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kozak, Joseph P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Major, Joshua [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Moreno, Gilberto [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Paret, Paul P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tomerlin, Jeff J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-09

    Low-cost, high-performance thermal management technologies are helping meet aggressive power density, specific power, cost, and reliability targets for power electronics and electric machines. The National Renewable Energy Laboratory is working closely with numerous industry and research partners to help influence development of components that meet aggressive performance and cost targets through development and characterization of cooling technologies, and thermal characterization and improvements of passive stack materials and interfaces. Thermomechanical reliability and lifetime estimation models are important enablers for industry in cost-and time-effective design.

  10. Electric Power Infrastructure Reliability And Security Research And Development Initiative. Final report

    International Nuclear Information System (INIS)

    Dale, S.; Meeker, R.; Steurer, M.; Li, H.; Pamidi, S.; Rodrigo, H.; Suryanarayanan, S.; Cartes, D.; Ordonez, J.; Domijan, A.; Liu, W.; Cox, D.; McLaren, P.; Hovsapian, R.; Edwards, D.; Simmons, S.; Wilde, N.; Woodruff, S.; Kopriva, D.; Hussaini, Y.; Mohammed, O.; Zheng, J.; Baldwin, T.L.

    2008-01-01

    This is the final scientific/technical report for the Electric Power Infrastructure Reliability and Security R and D Initiative sponsored by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, under award number DE-FG02-05CH11292. This report covers results from the FSU-led, multi-institution effort conducted over the period 8/15/05 to 10/14/2007. Building upon existing infrastructure for power systems research, modeling, and simulation, the Center for Advanced Power Systems (CAPS) at Florida State University (FSU) is developing world-class programs in electric power systems research and education to support future electric power system needs and challenges. With U.S. Department of Energy Support, FSU CAPS has engaged in a multi-faceted effort to conduct basic and applied research towards understanding, developing, and deploying technologies and approaches that can lead to improved reliability and security of the North American electric power generation and delivery infrastructure. This wide-reaching project, through a number of carefully selected thrusts cutting across several research disciplines, set out to address key terrestrial electric utility power system issues and challenges. The challenges and the thrusts to address them were arrived at through analysis of a number of national reports and recommendations combined with input from an experienced multi-disciplined team of power systems research staff and faculty at FSU CAPS. The resulting project effort can be grouped into four major areas: - Power Systems and New Technology Insertion - Controls, Protection, and Security - Simulation Development - High Temperature Superconductivity (HTS)

  11. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  12. Natural-gas-powered thermoelectricity as a reliability factor in the Brazilian electric sector

    International Nuclear Information System (INIS)

    Fernandes, E.; Oliveira, J.C.S. de; de Oliveira, P.R.; Alonso, P.S.R.

    2008-01-01

    The introduction of natural-gas-powered thermoelectricity into the Brazilian generation sector can be considered as a very complex energy, economic, regulatory and institutional revision. Brazil is a country with very specific characteristics in electricity generation, as approximately 80% of the generating capacity is based on hydroelectricity, showing strong dependency on rain and management of water reservoirs. A low rate of investment in the Brazilian Electricity Industry in the period of 1995-2000, associated with periods of low rainfall, led to a dramatic lowering of the water stocks in the reservoirs. With this scenario and the growing supply of natural gas, both from within Brazil and imported, natural gas thermal electric plants became a good option to diversify the electrical supply system. In spite of the Brazilian Government's efforts to install such plants, the country was faced with severe electricity rationing in 2001. The objective of this work is to show the need to continue with the implementation of natural gas thermal electricity projects, in a manner that allows flexibility and guarantees greater working reliability for the entire Brazilian electricity sector. Taking into account the world trend towards renewable energy, the perspectives of usage of biofuels in the Brazilian Energy Matrix and in electrical energy generation are also analyzed. The very issue of electrical power efficiency in Brazil and its challenges and strategic proposals from the standpoint of Government Programs and results provided so far are presented. The technological constraints in order to put on stream the thermal electric plants are also analyzed. The article concludes with a positive perspective of the usage of natural gas as to be the third pillar in the Brazilian Energy Matrix for the years to come

  13. THE ANALYSIS OF STRUCTURAL RELIABILITY OF THE MAIN ELECTRIC CONNECTION CIRCUITS OF NUCLEAR POWER PLANTS

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2017-01-01

    Full Text Available The reliability of the main circuit of electrical connections at a nuclear electric power plant that has two units with a capacity of 1,200 MW each has been determined. Reliability, economical, maneuverable properties of the atomic power plant under study are largely determined by its main circuit, so the choice of the circuit for the design and its status in the process of operation occur to be critical objectives. Main electrical connection circuits in nuclear electric power plants are selected on the basis of the schematic networks of the energy system and the land attached to the plant. The circuit of the connection of a nuclear power plant to the grid in the original normal operating modes at all stages of the construction of such a plant should provide the outcome of the full added capacity of a nuclear power plant and the preservation of its stability in the power system without the influence of the emergency system automatics when any outgoing transmission line is disabled. When selecting the main circuit the individual capacity of the installed units and their number are taken into account as well as the order of development of the plant and power supply system; the voltage on which the power of a plant is delivered; a shortcircuit current for switchgear high voltage and the need for their limitation by circuit means; the most power that can be lost when damage to any switch. A model of reliability of the main circuit of electrical connections is designed to detect all types of accidents that are possible at the coincidence of failures of elements with the repair and operational modes that differs in composition and damageability of the equipment, as well as under conditions of the development of accidents due to failure of operation of devices of relay protection and automation.

  14. Electrical system design and reliability at Ontario Hydro nuclear generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Royce, C. J. [Ontario Hydro, 700 University Avenue, Toronto, Ontario M5G 1X6 (Canada)

    1986-02-15

    This paper provides an overview of design practice and the predicted and actual reliability of electrical station service Systems at Ontario Nuclear Generating Stations. Operational experience and licensing changes have indicated the desirability of improving reliability in certain instances. For example, the requirement to start large emergency coolant injection pumps resulted in the turbine generator units in a multi-unit station being used as a back-up power supply. Results of reliability analyses are discussed. To mitigate the effects of common mode events Ontario Hydro adopted a 'two group' approach to the design of safety related Systems. This 'two group' approach is reviewed and a single fully environmentally qualified standby power supply is proposed for future use. (author)

  15. Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market

    International Nuclear Information System (INIS)

    Hemmati, Reza; Hooshmand, Rahmat-Allah; Khodabakhshian, Amin

    2013-01-01

    Highlights: • Generation expansion planning is presented in deregulated electricity market. • Wind farm uncertainty is modeled in the problem. • The profit of each GENCO is maximized and also the safe operation of system is satisfied. • Salve sector is managed as an optimization programming and solved by using PSO technique. • Master sector is considered in pool market and Cournot model is used to simulate it. - Abstract: This paper addresses reliability constrained generation expansion planning (GEP) in the presence of wind farm uncertainty in deregulated electricity market. The proposed GEP aims at maximizing the expected profit of all generation companies (GENCOs), while considering security and reliability constraints such as reserve margin and loss of load expectation (LOLE). Wind farm uncertainty is also considered in the planning and GENCOs denote their planning in the presence of wind farm uncertainty. The uncertainty is modeled by probability distribution function (PDF) and Monte-Carlo simulation (MCS) is used to insert uncertainty into the problem. The proposed GEP is a constrained, nonlinear, mixed-integer optimization programming and solved by using particle swarm optimization (PSO) method. In this paper, Electricity market structure is modeled as a pool market. Simulation results verify the effectiveness and validity of the proposed planning for maximizing GENCOs profit in the presence of wind farms uncertainties in electricity market

  16. The Challenge Posed by Geomagnetic Activity to Electric Power Reliability: Evidence From England and Wales

    Science.gov (United States)

    Forbes, Kevin F.; St. Cyr, O. C.

    2017-10-01

    This paper addresses whether geomagnetic activity challenged the reliability of the electric power system during part of the declining phase of solar cycle 23. Operations by National Grid in England and Wales are examined over the period of 11 March 2003 through 31 March 2005. This paper examines the relationship between measures of geomagnetic activity and a metric of challenged electric power reliability known as the net imbalance volume (NIV). Measured in megawatt hours, NIV represents the sum of all energy deployments initiated by the system operator to balance the electric power system. The relationship between geomagnetic activity and NIV is assessed using a multivariate econometric model. The model was estimated using half-hour settlement data over the period of 11 March 2003 through 31 December 2004. The results indicate that geomagnetic activity had a demonstrable effect on NIV over the sample period. Based on the parameter estimates, out-of-sample predictions of NIV were generated for each half hour over the period of 1 January to 31 March 2005. Consistent with the existence of a causal relationship between geomagnetic activity and the electricity market imbalance, the root-mean-square error of the out-of-sample predictions of NIV is smaller; that is, the predictions are more accurate, when the statistically significant estimated effects of geomagnetic activity are included as drivers in the predictions.

  17. Electric propulsion reliability: Statistical analysis of on-orbit anomalies and comparative analysis of electric versus chemical propulsion failure rates

    Science.gov (United States)

    Saleh, Joseph Homer; Geng, Fan; Ku, Michelle; Walker, Mitchell L. R.

    2017-10-01

    With a few hundred spacecraft launched to date with electric propulsion (EP), it is possible to conduct an epidemiological study of EP's on orbit reliability. The first objective of the present work was to undertake such a study and analyze EP's track record of on orbit anomalies and failures by different covariates. The second objective was to provide a comparative analysis of EP's failure rates with those of chemical propulsion. Satellite operators, manufacturers, and insurers will make reliability- and risk-informed decisions regarding the adoption and promotion of EP on board spacecraft. This work provides evidence-based support for such decisions. After a thorough data collection, 162 EP-equipped satellites launched between January 1997 and December 2015 were included in our dataset for analysis. Several statistical analyses were conducted, at the aggregate level and then with the data stratified by severity of the anomaly, by orbit type, and by EP technology. Mean Time To Anomaly (MTTA) and the distribution of the time to (minor/major) anomaly were investigated, as well as anomaly rates. The important findings in this work include the following: (1) Post-2005, EP's reliability has outperformed that of chemical propulsion; (2) Hall thrusters have robustly outperformed chemical propulsion, and they maintain a small but shrinking reliability advantage over gridded ion engines. Other results were also provided, for example the differentials in MTTA of minor and major anomalies for gridded ion engines and Hall thrusters. It was shown that: (3) Hall thrusters exhibit minor anomalies very early on orbit, which might be indicative of infant anomalies, and thus would benefit from better ground testing and acceptance procedures; (4) Strong evidence exists that EP anomalies (onset and likelihood) and orbit type are dependent, a dependence likely mediated by either the space environment or differences in thrusters duty cycles; (5) Gridded ion thrusters exhibit both

  18. Drought and Heat Wave Impacts on Electricity Grid Reliability in Illinois

    Science.gov (United States)

    Stillwell, A. S.; Lubega, W. N.

    2016-12-01

    A large proportion of thermal power plants in the United States use cooling systems that discharge large volumes of heated water into rivers and cooling ponds. To minimize thermal pollution from these discharges, restrictions are placed on temperatures at the edge of defined mixing zones in the receiving waters. However, during extended hydrological droughts and heat waves, power plants are often granted thermal variances permitting them to exceed these temperature restrictions. These thermal variances are often deemed necessary for maintaining electricity reliability, particularly as heat waves cause increased electricity demand. Current practice, however, lacks tools for the development of grid-scale operational policies specifying generator output levels that ensure reliable electricity supply while minimizing thermal variances. Such policies must take into consideration characteristics of individual power plants, topology and characteristics of the electricity grid, and locations of power plants within the river basin. In this work, we develop a methodology for the development of these operational policies that captures necessary factors. We develop optimal rules for different hydrological and meteorological conditions, serving as rule curves for thermal power plants. The rules are conditioned on leading modes of the ambient hydrological and meteorological conditions at the different power plant locations, as the locations are geographically close and hydrologically connected. Heat dissipation in the rivers and cooling ponds is modeled using the equilibrium temperature concept. Optimal rules are determined through a Monte Carlo sampling optimization framework. The methodology is applied to a case study of eight power plants in Illinois that were granted thermal variances in the summer of 2012, with a representative electricity grid model used in place of the actual electricity grid.

  19. Development of the Japanese version of the Council on Nutrition Appetite Questionnaire and its simplified versions, and evaluation of their reliability, validity, and reproducibility.

    Science.gov (United States)

    Tokudome, Yuko; Okumura, Keiko; Kumagai, Yoshiko; Hirano, Hirohiko; Kim, Hunkyung; Morishita, Shiho; Watanabe, Yutaka

    2017-11-01

    Because few Japanese questionnaires assess the elderly's appetite, there is an urgent need to develop an appetite questionnaire with verified reliability, validity, and reproducibility. We translated and back-translated the Council on Nutrition Appetite Questionnaire (CNAQ), which has eight items, into Japanese (CNAQ-J), as well as the Simplified Nutritional Appetite Questionnaire (SNAQ-J), which includes four CNAQ-J-derived items. Using structural equation modeling, we examined the CNAQ-J structure based on data of 649 Japanese elderly people in 2013, including individuals having a certain degree of cognitive impairment, and we developed the SNAQ for the Japanese elderly (SNAQ-JE) according to an exploratory factor analysis. Confirmatory factor analyses on the appetite questionnaires were conducted to probe fitting to the model. We computed Cronbach's α coefficients and criterion-referenced/-related validity figures examining associations of the three appetite battery scores with body mass index (BMI) values and with nutrition-related questionnaire values. Test-retest reproducibility of appetite tools was scrutinized over an approximately 2-week interval. An exploratory factor analysis demonstrated that the CNAQ-J was constructed of one factor (appetite), yielding the SNAQ-JE, which includes four questions derived from the CNAQ-J. The three appetite instruments showed almost equivalent fitting to the model and reproducibility. The CNAQ-J and SNAQ-JE demonstrated satisfactory reliability and significant criterion-referenced/-related validity values, including BMIs, but the SNAQ-J included a low factor-loading item, exhibited less satisfactory reliability and had a non-significant relationship to BMI. The CNAQ-J and SNAQ-JE may be applied to assess the appetite of Japanese elderly, including persons with some cognitive impairment. Copyright © 2017 The Authors. Production and hosting by Elsevier B.V. All rights reserved.

  20. Controlled Operation of the Islanded Portion of the International Council on Large Electric Systems (CIGRE Low Voltage Distribution Network

    Directory of Open Access Journals (Sweden)

    Ghullam Mustafa Bhutto

    2017-07-01

    Full Text Available In islanding, a portion of the power network, comprised of the loads and distributed generation (DG units, is isolated from the rest of the power grid and forms a micro grid (MG. In this condition, it becomes essential for the islanded MG to operate in a stable and controlled manner by providing ancillary services. When the MG is cut off from the main grid, the islanding must be detected by the DG units. In this condition it is essential that one of the controllers should be switched to the voltage-frequency (VF control mode. In islanding, the network loses it slack reference and this reference is established by a VF controller. The voltage and the frequency of the islanded MG deviate when disconnected from the transmission grid and these deviations are caused by the load-generation imbalance. The voltage and the frequency of the islanded MG can be restored to the permissible limits if the desired/exceeded amount of active and reactive power is injected/absorbed by the locally available sources in islanded MG. This paper proposes a control strategy which can compensate the voltage and the frequency deviations in the islanded portion of the International Council on Large Electric Systems (CIGRE low voltage distribution network by using advanced power electronics devices such as STATCOMs for Photovoltaic (PV Units and Battery Energy Storage Systems (BESS STATCOMs (for battery units. The selection of the VF controller for the most suitable DG unit of this test network is also presented in this paper, and the effectiveness of the controllers is verified by presenting simulation results using DIgSILENT (DIgSILENT GmbH, Gomaringen, Germany power factory software version 15.0.

  1. Impact of nuclear fuel performance and reliability in a deregulated electricity market

    International Nuclear Information System (INIS)

    Barnoski, M.; Kaiser, B.

    1997-01-01

    US nuclear plants are now placing a great deal of importance on fuel performance and reliability because of their direct effect on a plant's capacity factor, availability, operating flexibility, outage duration, and worker exposure. This is reflected by utilities making fuel reliability a principal vendor evaluation criterion and making fuel performance an important bonus/penalty provision. Defect-free fuel, combined with ever improving design features, makes it possible for plants to operate at higher outputs while reducing operating and maintenance costs. Higher electrical output at lower cost is essential for US nuclear plants to meet the expected competition in a deregulated market. Through continued investment in manufacturing improvements and a vigilant, systematic design process, ABB's nuclear fuel has contributed to helping its nuclear utility customers reduce their cost of doing business. (author) 1 fig., 1 tab

  2. Coal-Powered Electric Generating Unit Efficiency and Reliability Dialogue: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Emmanuel [Energetics, Inc., Columbia, MD (United States)

    2018-02-01

    Coal continues to play a critical role in powering the Nation’s electricity generation, especially for baseload power plants. With aging coal generation assets facing decreased performance due to the state of the equipment, and with challenges exacerbated by the current market pressures on the coal sector, there are opportunities to advance early-stage technologies that can retrofit or replace equipment components. These changes will eventually result in significant improvements in plant performance once further developed and deployed by industry. Research and development in areas such as materials, fluid dynamics, fuel properties and preparation characteristics, and a new generation of plant controls can lead to new components and systems that can help improve the efficiency and reliability of coal-fired power plants significantly, allowing these assets to continue to provide baseload power. Coal stockpiles at electricity generation plants are typically large enough to provide 30 to 60 days of power prior to resupply—significantly enhancing the stability and reliability of the U.S. electricity sector. Falling prices for non-dispatchable renewable energy and mounting environmental regulations, among other factors, have stimulated efforts to improve the efficiency of these coal-fired electric generating units (EGUs). In addition, increased reliance on natural gas and non-dispatchable energy sources has spurred efforts to further increase the reliability of coal EGUs. The Coal Powered EGU Efficiency and Reliability Dialogue brought together stakeholders from across the coal EGU industry to discuss methods for improvement. Participants at the event reviewed performance-enhancing innovations in coal EGUs, discussed the potential for data-driven management practices to increase efficiency and reliability, investigated the impacts of regulatory compliance on coal EGU performance, and discussed upcoming challenges for the coal industry. This report documents the key

  3. Risk-based methods for reliability investments in electric power distribution systems

    Energy Technology Data Exchange (ETDEWEB)

    Alvehag, Karin

    2011-07-01

    Society relies more and more on a continuous supply of electricity. However, while under investments in reliability lead to an unacceptable number of power interruptions, over investments result in too high costs for society. To give incentives for a socio economically optimal level of reliability, quality regulations have been adopted in many European countries. These quality regulations imply new financial risks for the distribution system operator (DSO) since poor reliability can reduce the allowed revenue for the DSO and compensation may have to be paid to affected customers. This thesis develops a method for evaluating the incentives for reliability investments implied by different quality regulation designs. The method can be used to investigate whether socio economically beneficial projects are also beneficial for a profit-maximizing DSO subject to a particular quality regulation design. To investigate which reinvestment projects are preferable for society and a DSO, risk-based methods are developed. With these methods, the probability of power interruptions and the consequences of these can be simulated. The consequences of interruptions for the DSO will to a large extent depend on the quality regulation. The consequences for the customers, and hence also society, will depend on factors such as the interruption duration and time of occurrence. The proposed risk-based methods consider extreme outage events in the risk assessments by incorporating the impact of severe weather, estimating the full probability distribution of the total reliability cost, and formulating a risk-averse strategy. Results from case studies performed show that quality regulation design has a significant impact on reinvestment project profitability for a DSO. In order to adequately capture the financial risk that the DSO is exposed to, detailed riskbased methods, such as the ones developed in this thesis, are needed. Furthermore, when making investment decisions, a risk

  4. METHODS OF IMPROVING THE RELIABILITY OF THE CONTROL SYSTEM TRACTION POWER SUPPLY OF ELECTRIC TRANSPORT BASED ON AN EXPERT INFORMATION

    Directory of Open Access Journals (Sweden)

    O. O. Matusevych

    2009-03-01

    Full Text Available The author proposed the numerous methods of solving the multi-criterion task – increasing of reliability of control system on the basis of expert information. The information, which allows choosing thoughtfully the method of reliability increasing for a control system of electric transport, is considered.

  5. Reliable electricity. The effects of system integration and cooperative measures to make it work

    International Nuclear Information System (INIS)

    Hagspiel, Simeon; Koeln Univ.

    2017-01-01

    We investigate the effects of system integration for reliability of supply in regional electricity systems along with cooperative measures to support it. Specifically, we set up a model to contrast the benefits from integration through statistical balancing (i.e., a positive externality) with the risk of cascading outages (a negative externality). The model is calibrated with a comprehensive dataset comprising 28 European countries on a high spatial and temporal resolution. We find that positive externalities from system integration prevail, and that cooperation is key to meet reliability targets efficiently. To enable efficient solutions in a non-marketed environment, we formulate the problem as a cooperative game and study different rules to allocate the positive and negative effects to individual countries. Strikingly, we find that without a mechanism, the integrated solution is unstable. In contrast, proper transfer payments can be found to make all countries better off in full integration, and the Nucleolus is identified as a particularly promising candidate. The rule could be used as a basis for compensation payments to support the successful integration and cooperation of electricity systems.

  6. Reliable electricity. The effects of system integration and cooperative measures to make it work

    Energy Technology Data Exchange (ETDEWEB)

    Hagspiel, Simeon [Koeln Univ. (Germany). Energiewirtschaftliches Inst.; Koeln Univ. (Germany). Dept. of Economics

    2017-12-15

    We investigate the effects of system integration for reliability of supply in regional electricity systems along with cooperative measures to support it. Specifically, we set up a model to contrast the benefits from integration through statistical balancing (i.e., a positive externality) with the risk of cascading outages (a negative externality). The model is calibrated with a comprehensive dataset comprising 28 European countries on a high spatial and temporal resolution. We find that positive externalities from system integration prevail, and that cooperation is key to meet reliability targets efficiently. To enable efficient solutions in a non-marketed environment, we formulate the problem as a cooperative game and study different rules to allocate the positive and negative effects to individual countries. Strikingly, we find that without a mechanism, the integrated solution is unstable. In contrast, proper transfer payments can be found to make all countries better off in full integration, and the Nucleolus is identified as a particularly promising candidate. The rule could be used as a basis for compensation payments to support the successful integration and cooperation of electricity systems.

  7. On the complex analysis of the reliability, safety, and economic efficiency of atomic electric power stations

    International Nuclear Information System (INIS)

    Emel'yanov, I.Ya.; Klemin, A.I.; Polyakov, E.F.

    1977-01-01

    The problem is posed of effectively increasing the engineering performance of nuclear electric power stations (APS). The principal components of the engineering performance of modern large APS are considered: economic efficiency, radiation safety, reliability, and their interrelationship. A nomenclature is proposed for the quantitative indices which most completely characterize the enumerated properties and are convenient for the analysis of the engineering performance. The urgent problem of developing a methodology for the complex analysis and optimization of the principal performance components is considered; this methodology is designed to increase the efficiency of the work on high-performance competitive APS. The principle of complex optimization of the reliability, safety, and economic-efficiency indices is formulated; specific recommendations are made for the practical realization of this principle. The structure of the complex quantiative analysis of the enumerated performance components is given. The urgency and promise of the complex approach to solving the problem of APS optimization is demonstrated, i.e., the solution of the problem of creating optimally reliable, fairly safe, and maximally economically efficient stations

  8. Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Rick Meeker; L. Baldwin; Steinar Dale; Alexander Domijan; Davild Larbalestier; Hui Li; Peter McLaren; Sastry Pamidi; Horatio Rodrigo; Michael Steurer

    2010-03-31

    Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and

  9. STRUCTURAL FLUCTUATIONS, ELECTRICAL RESPONSE AND THE RELIABILITY OF NANOSTRUCTURES (FINAL REPORT)

    Energy Technology Data Exchange (ETDEWEB)

    Philip J. Rous; Ellen D. Williams; Michael S. Fuhrer

    2006-07-31

    The goal of the research supported by DOE-FG02-01ER45939 was to synthesize a number of experimental and theoretical approaches to understand the relationship between morphological fluctuations, the electrical response and the reliability (failure) of metallic nanostructures. The primary focus of our work was the study of metallic nanowires which we regard as prototypical of nanoscale interconnects. Our research plan has been to link together these materials properties and behaviors by understanding the phenomenon of, and the effects of electromigration at nanometer length scales. The thrust of our research has been founded on the concept that, for nanostructures where the surface-to-volume ratio is necessarily high, surface diffusion is the dominant mass transport mechanism that governs the fluctuations, electrical properties and failure modes of nanostructures. Our approach has been to develop experimental methods that permit the direct imaging of the electromagnetic distributions within nanostructures, their structural fluctuations and their electrical response. This experimental research is complemented by a parallel theoretical and computational program that describes the temporal evolution of nanostructures in response to current flow.

  10. Dynamic Self-Adaptive Reliability Control for Electric-Hydraulic Systems

    Directory of Open Access Journals (Sweden)

    Yi Wan

    2015-02-01

    Full Text Available The high-speed electric-hydraulic proportional control is a new development of the hydraulic control technique with high reliability, low cost, efficient energy, and easy maintenance; it is widely used in industrial manufacturing and production. However, there are still some unresolved challenges, the most notable being the requirements of high stability and real-time by the classical control algorithm due to its high nonlinear characteristics. We propose a dynamic self-adaptive mixed control method based on the least squares support vector machine (LSSVM and the genetic algorithm for high-speed electric-hydraulic proportional control systems in this paper; LSSVM is used to identify and adjust online a nonlinear electric-hydraulic proportional system, and the genetic algorithm is used to optimize the control law of the controlled system and dynamic self-adaptive internal model control and predictive control are implemented by using the mixed intelligent method. The internal model and the inverse control model are online adjusted together. At the same time, a time-dependent Hankel matrix is constructed based on sample data; thus finite dimensional solution can be optimized on finite dimensional space. The results of simulation experiments show that the dynamic characteristics are greatly improved by the mixed intelligent control strategy, and good tracking and high stability are met in condition of high frequency response.

  11. Analyzing the topological, electrical and reliability characteristics of a power transmission system for identifying its critical elements

    International Nuclear Information System (INIS)

    Zio, E.; Golea, L.R.

    2012-01-01

    The subject of this paper is the analysis of an electrical transmission system with the objective of identifying its most critical elements with respect to failures and attacks. The methodological approach undertaken is based on graph-theoretical (topological) network analysis. Four different perspectives of analysis are considered within the formalism of weighed networks, adding to the purely topological analysis of the system, the reliability and electrical characteristics of its components. In each phase of the analysis: i) a graph-theoretical representation is offered to highlight the structure of the most important system connections according to the particular characteristics examined (topological, reliability, electrical or electrical-reliability), ii) the classical degree index of a network node is extended to account for the different characteristics considered. The application of these concepts of analysis to an electrical transmission system of literature confirms the importance of different perspectives of analysis on such a critical infrastructure. - Highlights: ► We analyze a power system from topological, reliability and electrical perspectives. ► We rank critical components within a vulnerability assessment framework. ► We compute an extended degree to rank critical energy paths. ► We compare several analytical approaches and provide a table for choosing among them. ► We suggest network changes to increase the reliability of highly loaded energy paths.

  12. A reliable method for intracranial electrode implantation and chronic electrical stimulation in the mouse brain.

    Science.gov (United States)

    Jeffrey, Melanie; Lang, Min; Gane, Jonathan; Wu, Chiping; Burnham, W McIntyre; Zhang, Liang

    2013-08-06

    Electrical stimulation of brain structures has been widely used in rodent models for kindling or modeling deep brain stimulation used clinically. This requires surgical implantation of intracranial electrodes and subsequent chronic stimulation in individual animals for several weeks. Anchoring screws and dental acrylic have long been used to secure implanted intracranial electrodes in rats. However, such an approach is limited when carried out in mouse models as the thin mouse skull may not be strong enough to accommodate the anchoring screws. We describe here a screw-free, glue-based method for implanting bipolar stimulating electrodes in the mouse brain and validate this method in a mouse model of hippocampal electrical kindling. Male C57 black mice (initial ages of 6-8 months) were used in the present experiments. Bipolar electrodes were implanted bilaterally in the hippocampal CA3 area for electrical stimulation and electroencephalographic recordings. The electrodes were secured onto the skull via glue and dental acrylic but without anchoring screws. A daily stimulation protocol was used to induce electrographic discharges and motor seizures. The locations of implanted electrodes were verified by hippocampal electrographic activities and later histological assessments. Using the glue-based implantation method, we implanted bilateral bipolar electrodes in 25 mice. Electrographic discharges and motor seizures were successfully induced via hippocampal electrical kindling. Importantly, no animal encountered infection in the implanted area or a loss of implanted electrodes after 4-6 months of repetitive stimulation/recording. We suggest that the glue-based, screw-free method is reliable for chronic brain stimulation and high-quality electroencephalographic recordings in mice. The technical aspects described this study may help future studies in mouse models.

  13. Review of the human reliability analysis performed for Empire State Electric Energy Research Corporation

    International Nuclear Information System (INIS)

    Swart, D.; Banz, I.

    1985-01-01

    The Empire State Electric Energy Research Corporation (ESEERCO) commissioned Westinghouse to conduct a human reliability analysis to identify and quantify human error probabilities associated with operator actions for four specific events which may occur in light water reactors: loss of coolant accident, steam generator tube rupture, steam/feed line break, and stuck open pressurizer spray valve. Human Error Probabilities (HEPs) derived from Swain's Technique for Human Error Rate Prediction (THERP) were compared to data obtained from simulator exercises. A correlation was found between the HEPs derived from Swain and the results of the simulator data. The results of this study provide a unique insight into human factors analysis. The HEPs obtained from such probabilistic studies can be used to prioritize scenarios for operator training situations, and thus improve the correlation between simulator exercises and real control room experiences

  14. Efforts to improve safety and reliability of nuclear power plants in Kyushu Electric Power

    International Nuclear Information System (INIS)

    Yamamoto, Satoshi

    2014-01-01

    After the Fukushima accident, Kyushu Electric Power Co. took emergency safety measures requested by government to ensure power supply, coolant supply pumps and cooling water so as to keep cooling fuels in the reactor and spent fuel storage pool in case of losses of ordinary cooling capability caused by earthquake and tsunami. In order to improve safety and reliability of nuclear power plants, further efforts based on lessons learned from the Fukushima accident had been made to diversify corresponding equipment of safety measures in terms of prevention of core damage, prevention of containment failure, mitigation of radioactive materials release, cooling of spent fuel pit and ensurance of power supply, and to enhance emergency response capability so as to make operational management more complete. Additional safety measures applicable to new regulatory requirements against severe accidents were in progress. This article introduced details of such activities. (T. Tanaka)

  15. Economic evaluation of reliability-centred maintenance (RCM): an electricity transmission industry perspective

    International Nuclear Information System (INIS)

    Bowler, D.J.; Primrose, P.L.; Leonard, R.

    1995-01-01

    Traditional approaches to appraising the introduction of reliability centred maintenance (RCM) are shown to exhibit severe limitations. In particular, the economic implications surrounding its adoption are repeatedly mis-stated, with the consequence that organisations may be investing in unprofitable RCM ventures. Previously quoted benefits are examined and, contrary to established opinion, it is shown that these 'generalised' statements, once redeemed, are able to be quantified. The paper then proceeds to describe a financial methodology, developed by NGC and UMIST, by which the introduction of RCM can be evaluated. Moreover, it shows that, by regarding RCM as an investment decision, rather than an 'act of faith', the economic viability of a potential application can be determined before vital resources are committed. Finally, it is demonstrated that when the methodology is applied within the context of the electricity transmission industry, the economic case underlying the adoption of RCM can be realistically appraised. (author)

  16. Engineering of electrical systems of nuclear power stations for improved reliability

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Ramanathan, K.; Choudhary, N.N.

    1977-01-01

    Operational problems experienced in electrical systems/equipment of the Tarapur Atomic Power Station (TAPS) and the Rajasthan Atomic Power Station (RAPS) and their solutions are dealt in detail. This experience has led to new design concepts which are being introduced for improved reliability in design of the Madras Atomic Power Project (MAPP) and the Narora Atomic Power Project (NAPP). Saline pollution on switchyard equipments was the major problem of the TAPS due to its coastal location. Saline pollution resulted in flash over of insulators and failure of clamps. The problem was solved by suitable changes in insulators, conductors, transformers, switches and arranging portable live line washing of the switchyard equipment. In MAPP which is also located on coast, an indoor switchyard is built. NAPP is located in a seismic zone, therefore, all equipment is specified for appropriate seismic duty. Various other improvements are described. (M.G.B.)

  17. Updated Value of Service Reliability Estimates for Electric Utility Customers in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Michael [Nexant Inc., Burlington, MA (United States); Schellenberg, Josh [Nexant Inc., Burlington, MA (United States); Blundell, Marshall [Nexant Inc., Burlington, MA (United States)

    2015-01-01

    This report updates the 2009 meta-analysis that provides estimates of the value of service reliability for electricity customers in the United States (U.S.). The meta-dataset now includes 34 different datasets from surveys fielded by 10 different utility companies between 1989 and 2012. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods, it was possible to integrate their results into a single meta-dataset describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the U.S. for industrial, commercial, and residential customers. This report focuses on the backwards stepwise selection process that was used to develop the final revised model for all customer classes. Across customer classes, the revised customer interruption cost model has improved significantly because it incorporates more data and does not include the many extraneous variables that were in the original specification from the 2009 meta-analysis. The backwards stepwise selection process led to a more parsimonious model that only included key variables, while still achieving comparable out-of-sample predictive performance. In turn, users of interruption cost estimation tools such as the Interruption Cost Estimate (ICE) Calculator will have less customer characteristics information to provide and the associated inputs page will be far less cumbersome. The upcoming new version of the ICE Calculator is anticipated to be released in 2015.

  18. Reliability of Power Units in Poland and the World

    Directory of Open Access Journals (Sweden)

    Józef Paska

    2015-09-01

    Full Text Available One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland, NERC (North American Electric Reliability Corporation – USA, and WEC (World Energy Council. Deficiencies and the lack of a unified national system for collecting and processing electric power equipment unavailability data are also indicated.

  19. Reliability Indicators of Urban Electric Network Schemes for Supply of Second and Third Category Consumers

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2012-01-01

    Full Text Available The paper considers two schemes of the urban distributive electric network for supply of the second and third category consumers for whom indicators of reliability have been determined.As for a network scheme of the 2nd category it has been determined that while installing low-oil and vacuum switches at a distributive point the most remote transformer substation has the highest non-availability  factor which is higher of the corresponding non-availability  factor of the nearest transformer substation by 1,21–1,23 fold  accordingly.As for a network scheme of the 3rd category consumers it has been obtained the data that reliability of consumers receiving supply from bus-bars of transformer substations with 0,38 kW voltage changes  significantly (by 1,2–1,9-fold while changing a breakpoint of the network with 10 kW voltage.

  20. A reliability design method for a lithium-ion battery pack considering the thermal disequilibrium in electric vehicles

    Science.gov (United States)

    Xia, Quan; Wang, Zili; Ren, Yi; Sun, Bo; Yang, Dezhen; Feng, Qiang

    2018-05-01

    With the rapid development of lithium-ion battery technology in the electric vehicle (EV) industry, the lifetime of the battery cell increases substantially; however, the reliability of the battery pack is still inadequate. Because of the complexity of the battery pack, a reliability design method for a lithium-ion battery pack considering the thermal disequilibrium is proposed in this paper based on cell redundancy. Based on this method, a three-dimensional electric-thermal-flow-coupled model, a stochastic degradation model of cells under field dynamic conditions and a multi-state system reliability model of a battery pack are established. The relationships between the multi-physics coupling model, the degradation model and the system reliability model are first constructed to analyze the reliability of the battery pack and followed by analysis examples with different redundancy strategies. By comparing the reliability of battery packs of different redundant cell numbers and configurations, several conclusions for the redundancy strategy are obtained. More notably, the reliability does not monotonically increase with the number of redundant cells for the thermal disequilibrium effects. In this work, the reliability of a 6 × 5 parallel-series configuration is the optimal system structure. In addition, the effect of the cell arrangement and cooling conditions are investigated.

  1. Improving electrical power systems reliability through locally controlled distributed curtailable load

    Science.gov (United States)

    Dehbozorgi, Mohammad Reza

    2000-10-01

    Improvements in power system reliability have always been of interest to both power companies and customers. Since there are no sizable electrical energy storage elements in electrical power systems, the generated power should match the load demand at any given time. Failure to meet this balance may cause severe system problems, including loss of generation and system blackouts. This thesis proposes a methodology which can respond to either loss of generation or loss of load. It is based on switching of electric water heaters using power system frequency as the controlling signal. The proposed methodology encounters, and the thesis has addressed, the following associated problems. The controller must be interfaced with the existing thermostat control. When necessary to switch on loads, the water in the tank should not be overheated. Rapid switching of blocks of load, or chattering, has been considered. The contributions of the thesis are: (A) A system has been proposed which makes a significant portion of the distributed loads connected to a power system to behave in a predetermined manner to improve the power system response during disturbances. (B) The action of the proposed system is transparent to the customers. (C) The thesis proposes a simple analysis for determining the amount of such loads which might be switched and relates this amount to the size of the disturbances which can occur in the utility. (D) The proposed system acts without any formal communication links, solely using the embedded information present system-wide. (E) The methodology of the thesis proposes switching of water heater loads based on a simple, localized frequency set-point controller. The thesis has identified the consequent problem of rapid switching of distributed loads, which is referred to as chattering. (F) Two approaches have been proposed to reduce chattering to tolerable levels. (G) A frequency controller has been designed and built according to the specifications required to

  2. 18-month outlook : an assessment of the reliability of the Ontario Electricity System

    International Nuclear Information System (INIS)

    2005-01-01

    This paper provides an 18 month forecast of the Ontario electricity system, as well as an outline of activities and recent developments relating to the issue of reliability. An additional aim of the paper was to identify potentially adverse conditions that may require adjustment or coordination of maintenance plans for generation and transmission equipment. Requests for proposals (RFPs) for renewable generation within the specified time-frame were also discussed, as well as the return to service of Ontario Power Generation's Pickering Unit 1. Reduced reserve levels for the summer of 2005 were anticipated, and details of forecasted peak demand, generator maintenance, new generation and price-responsive demand adjustments and forced outage rates were presented. It was suggested that adequate market mechanisms were in place to manage reserve levels. Developments concerning the new Parkway Transformer station were reviewed. A resource outlook was provided. Available resources were expected to exceed planning requirements with the exception of 6 weeks in the summer of 2005. A projected capacity increase was also anticipated, due to the return of Pickering 1 and an additional 515 MW in the fall of 2005. Price-responsive demands were forecasted to exceed 650 MW due to increases in dispatchable load. It was suggested that in order to ensure power demand during peak periods, imports may be required under extreme weather conditions, combined with the possible deferral or cancellation of generation maintenance. Transmission impacts due to shutdowns were discussed. Voltage system requirements were reviewed, along with details of the installation of additional shunt capacitors and transformer controls. The electricity market was reviewed in the context of current overall economic conditions. Data forecasting normal peak demand was presented for the entire outlook period. 19 tabs., 10 figs

  3. INCREASING RELIABILITY OF STEPPED AUTOMATIC STARTING AND RHEOSTAT BREAKING SYSTEM OF ELECTRIC TRAINS ER9T AND EPL9T

    Directory of Open Access Journals (Sweden)

    N. H. Visin

    2010-06-01

    Full Text Available The article examines transitional processes in the power circuit of tractive motors and their influence on the work of stepped automatic starting of electric trains ER9T and EPL9T. The recommendations for increasing the reliability of operation of multiple-unit rolling stock are proposed.

  4. Spacecraft electrical power subsystem: Failure behavior, reliability, and multi-state failure analyses

    International Nuclear Information System (INIS)

    Kim, So Young; Castet, Jean-Francois; Saleh, Joseph H.

    2012-01-01

    This article investigates the degradation and failure behavior of spacecraft electrical power subsystem (EPS) on orbit. First, this work provides updated statistical reliability and multi-state failure analyses of spacecraft EPS and its different constituents, namely the batteries, the power distribution, and the solar arrays. The EPS is shown to suffer from infant mortality and to be a major driver of spacecraft unreliability. Over 25% of all spacecraft failures are the result of EPS failures. As a result, satellite manufacturers may wish to pursue targeted improvement to this subsystem, either through better testing or burn-in procedures, better design or parts selection, or additional redundancy. Second, this work investigates potential differences in the EPS degradation and failure behavior for spacecraft in low earth orbits (LEO) and geosynchronous orbits (GEO). This analysis was motivated by the recognition that the power/load cycles and the space environment are significantly different in LEO and GEO, and as such, they may result in different failure behavior for the EPS in these two types of orbits. The results indicate, and quantify the extent to which, the EPS fails differently in LEO and GEO, both in terms of frequency and severity of failure events. A casual summary of the findings can be stated as follows: the EPS fails less frequently but harder (with fatal consequences to the spacecraft) in LEO than in GEO.

  5. Incorporating reliability evaluation into the uncertainty analysis of electricity market price

    International Nuclear Information System (INIS)

    Kang, Chongqing; Bai, Lichao; Xia, Qing; Jiang, Jianjian; Zhao, Jing

    2005-01-01

    A novel model and algorithm for analyzing the uncertainties in electricity market is proposed in this paper. In this model, bidding decision is formulated as a probabilistic model that takes into account the decision-maker's willingness to bid, risk preferences, the fluctuation of fuel-price, etc. At the same time, generating unit's uncertain output model is considered by its forced outage rate (FOR). Based on the model, the uncertainty of market price is then analyzed. Taking the analytical results into consideration, not only the reliability of the power system can be conventionally analyzed, but also the possible distribution of market prices can be easily obtained. The probability distribution of market prices can be further used to calculate the expected output and the sales income of generating unit in the market. Based on these results, it is also possible to evaluate the risk involved by generating units. A simple system with four generating units is used to illustrate the proposed algorithm. The proposed algorithm and the modeling technique are expected to helpful to the market participants in making their economic decisions

  6. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  7. An assessment of the reliability of the Ontario electricity system : 18-month outlook from April 2004 to September 2005

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents a resource assessment by the Independent Electricity Market Operator (IMO) for the 18-month period from April 2004 to September 2005. It is based on the IMO's forecast of electricity demand. The information was provided by power generators in Ontario. The outlook for the electricity system has improved due to the return to service of 3 nuclear units and the addition of more than 700 MW of generation. The return to service of the nuclear units has decreased Ontario's reliance on imports to help meet energy demand in the province. The shutdown of 1150 MW of coal-fired generation at Lakeview Thermal Generating Station in Mississauga emphasizes the importance of improving transmission and generation capacity in the Toronto area. This report also includes updated values for existing resource scenarios and planned resource scenarios. The reliability of Ontario's transmission system was also assessed along with the adequacy of the existing resource to meet the forecast demand. The existing installed generation resources include 5 nuclear stations generating 10,831 MW of electricity, 5 coal stations generating 7,564 MW of electricity, 22 oil and gas fired stations generating 4,364 MW of electricity, 61 hydroelectric stations generating 7,676 MW of electricity, and 2 other stations generating 66 MW of electricity. Although the existing resource scenario is better than in previous reports, imports will be required under extreme weather conditions to help meet electricity demand in Ontario during peak periods. 21 tabs., 10 figs

  8. Transmission reliability faces future challenges

    International Nuclear Information System (INIS)

    Beaty, W.

    1993-01-01

    The recently published Washington International Energy Group's 1993 Electric Utility Outlook states that nearly one-third (31 percent) of U.S. utility executives expect reliability to decrease in the near future. Electric power system stability is crucial to reliability. Stability analysis determines whether a system will stay intact under normal operating conditions, during minor disturbances such as load fluctuations, and during major disturbances when one or more parts of the system fails. All system elements contribute to reliability or the lack of it. However, this report centers on the transmission segment of the electric system. The North American Electric Reliability Council (NERC) says the transmission systems as planned will be adequate over the next 10 years. However, delays in building new lines and increasing demands for transmission services are serious concerns. Reliability concerns exist in the Mid-Continent Area Power Pool and the Mid-America Interconnected Network regions where transmission facilities have not been allowed to be constructed as planned. Portions of the transmission systems in other regions are loaded at or near their limits. NERC further states that utilities must be allowed to complete planned generation and transmission as scheduled. A reliable supply of electricity also depends on adhering to established operating criteria. Factors that could complicate operations include: More interchange schedules resulting from increased transmission services. Increased line loadings in portions of the transmission systems. Proliferation of non-utility generators

  9. 75 FR 20832 - National Coal Council

    Science.gov (United States)

    2010-04-21

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the National Coal Council (NCC). The Federal Advisory... Biomass/Coal Blending to Generate Electricity Council Business: [cir] Finance Report by Committee Chairman...

  10. Council Districts

    Data.gov (United States)

    Town of Cary, North Carolina — View the location of the Town of Cary’s four Town Council districts.Please note that one district, District A, is split into two geo-spatial areas. One area is in...

  11. Electric power monthly, April 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-07

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  12. Electric power monthly, May 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-25

    The Electric Power Monthly (EPM) is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  13. Influence of moisture and hydrogen purity of the reliability of powerful electric machines

    International Nuclear Information System (INIS)

    Vigovs'kij, O.V.; Khvalyin, D.Yi.; Mistets'kij, V.A.

    2017-01-01

    It is shown that today the turbo generators with hydrogen-water cooling system is most unreliable technical equipment of Ukrainian nuclear power plants. On the one hand, hydrogen has several advantages over other coolers; on the other hand, the presence of hydrogen in the turbo generators systems carries the danger of engine rooms of power plants. It is also shown that the water and oxygen are main hazardous impurities in hydrogen, and zone of generator shaft compaction is the most responsible zone with high concentration of water. From the analysis was found that increasing of hydrogen purity reduces the mechanical losses and the change in total losses depending on the hydrogen purity has a linear nature. For example, with an increase the hydrogen purity from 0,1203 to 0,09 the loss in turbo generator rotor can be reduced by nearly 500 kW, which is about 25 % at a pressure of 0,5 MPa. The possibility of using metal hydrides to ensure purity, purification and hydrogen sorption was looked. The most practical value is for such hydrides as LaNi5Hx, FeTiHx, ZrNiHx. The main advantage the metal hydrides method of purification is a significant reduction in the number of purification stages. It was shown that the use of a thermoelectric gas dryer will reduce the total consumption of technological gases, that are removed from nuclear power plants, by 2,3 - 2,4 times due to a decrease in 5,0 - 6,0 times their absolute humidity, and decrease by 5, 0 times the activity of gases due to an increase in their exposure time in the decrease activity installation. All this suggests that the creation a hydrogen humidity monitoring system in the exploited turbo generator will solve the problem of objective control of hydrogen purity with further computerization and accumulation the information. Using a drainage or purification system of hydrogen, reducing the temperature and humidity of the cooling gas, can increase the reliability of operation the turbo generators and significantly

  14. 78 FR 43198 - Flexible and Local Resources Needed for Reliability in the California Wholesale Electric Market...

    Science.gov (United States)

    2013-07-19

    ... auction impact the effectiveness of forward procurement for reliability purposes? Why or why not? 11:15 a... three-year forward resource adequacy obligation backed by a market-based CAISO backstop procurement... development of a durable, market-based mechanism to provide incentives to insure reliability needs are met...

  15. Strategic bidding of generating units in competitive electricity market with considering their reliability

    International Nuclear Information System (INIS)

    Soleymani, S.; Ranjbar, A.M.; Shirani, A.R.

    2008-01-01

    In the restructured power systems, they are typically scheduled based on the offers and bids to buy and sell energy and ancillary services (AS) subject to operational and security constraints. Generally, no account is taken of unit reliability when scheduling it. Therefore generating units have no incentive to improve their reliability. This paper proposes a new method to obtain the equilibrium points for reliability and price bidding strategy of units when the unit reliability is considered in the scheduling problem. The proposed methodology employs the supply function equilibrium (SFE) for modeling a unit's bidding strategy. Units change their bidding strategies and improve their reliability until Nash equilibrium points are obtained. GAMS (general algebraic modeling system) language has been used to solve the market scheduling problem using DICOPT optimization software with mixed integer non-linear programming. (author)

  16. High Electricity Demand in the Northeast U.S.: PJM Reliability Network and Peaking Unit Impacts on Air Quality.

    Science.gov (United States)

    Farkas, Caroline M; Moeller, Michael D; Felder, Frank A; Henderson, Barron H; Carlton, Annmarie G

    2016-08-02

    On high electricity demand days, when air quality is often poor, regional transmission organizations (RTOs), such as PJM Interconnection, ensure reliability of the grid by employing peak-use electric generating units (EGUs). These "peaking units" are exempt from some federal and state air quality rules. We identify RTO assignment and peaking unit classification for EGUs in the Eastern U.S. and estimate air quality for four emission scenarios with the Community Multiscale Air Quality (CMAQ) model during the July 2006 heat wave. Further, we population-weight ambient values as a surrogate for potential population exposure. Emissions from electricity reliability networks negatively impact air quality in their own region and in neighboring geographic areas. Monitored and controlled PJM peaking units are generally located in economically depressed areas and can contribute up to 87% of hourly maximum PM2.5 mass locally. Potential population exposure to peaking unit PM2.5 mass is highest in the model domain's most populated cities. Average daily temperature and national gross domestic product steer peaking unit heat input. Air quality planning that capitalizes on a priori knowledge of local electricity demand and economics may provide a more holistic approach to protect human health within the context of growing energy needs in a changing world.

  17. reliability reliability

    African Journals Online (AJOL)

    eobe

    Corresponding author, Tel: +234-703. RELIABILITY .... V , , given by the code of practice. However, checks must .... an optimization procedure over the failure domain F corresponding .... of Concrete Members based on Utility Theory,. Technical ...

  18. 77 FR 41184 - Coordination Between Natural Gas and Electricity Markets; Notice of Technical Conferences

    Science.gov (United States)

    2012-07-12

    ... Operator Inc. (MISO), Southwest Power Pool, Inc. (SPP) and Electric Reliability Council of Texas (ERCOT). While we recognize we do not have Federal Power Act jurisdiction over the rates or terms of service in...-electric interdependence. The commenters raised a wide variety of issues regarding gas-electric...

  19. Nuclear power plants electrical retrofitting for cost effectiveness, reliability and operating efficiency

    International Nuclear Information System (INIS)

    Ciufu, L.; Popescu, M. O.

    2016-01-01

    In the context of continuous fast growing of the energy demand the current power plants retrofitting concept may represent an important step in the emission reduction, being able to offer in the same time a maximum operating efficiency. This desideratum can be obtained by implementing a rigorous energy management plan, based on an increased energy production capacity of non-pollutant electrical power plants and future-oriented frame on extending their lifetime operation. This management is focused on using state-of-art electronic, electrical and industrial control equipments, which can represent a real key factor. Thus, in this paper an analysis of the electrical system retrofitting is presented. As a part of this research the authors propose and simulate ambitious ways to upgrade actual control and command of the electrical operating systems, by promoting variable speed for large pumps and also computer software, as SCADA, for an intelligent control and monitoring of these studied processes. (authors)

  20. The safety and reliability of the electricity transportation network, and the opening of markets

    International Nuclear Information System (INIS)

    Merlin, A.

    2003-01-01

    Following a decade in which the electricity sector was concerned by the opening of markets the world over, the year 2003 highlighted the challenges of secure supply and of the safety of electrical systems. Major incidents are nothing new throughout history, and occurred well before the trend towards opening the markets dot underway. However, it is necessary to verify that the rules for the organisation, clarification of responsibilities and regulation make it possible to control the growing complexity of interconnected systems related to opening the market up to competition. Faced with such situations, changes are necessary in Europe. Firstly, it is important to have the second European directive on the internal electricity market introduced everywhere, this directive providing common rules to be met by all key players to ensure greater safety within the electricity system, and strengthening the role of the electricity transport network manager, who is separate from the other players in the market. It is also necessary to draft a third directive, focusing on both security of supply and the operational safety of the European electricity system. (authors)

  1. Council Session

    CERN Multimedia

    CERN PhotoLab

    1977-01-01

    From face, 1st raw: Erich Lohrmann, Sergio Fubini, Léon Van Hove, John Adams (Directors-General), Paul Levaux (President of the Council) Hans-Otto Wüster, Franco Bonaudi, Robert Lévy-Mandel and 2nd raw, centre: Patrick Mollet, Eliane de Modzelewska, Jean-Marie Dufour

  2. Electric power monthly, March 1998 with data for December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The Electric Power Monthly (EPM) provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 63 tabs.

  3. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  4. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    Science.gov (United States)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  5. Accelerated reliability testing of highly aligned single-walled carbon nanotube networks subjected to DC electrical stressing.

    Science.gov (United States)

    Strus, Mark C; Chiaramonti, Ann N; Kim, Young Lae; Jung, Yung Joon; Keller, Robert R

    2011-07-01

    We investigate the electrical reliability of nanoscale lines of highly aligned, networked, metallic/semiconducting single-walled carbon nanotubes (SWCNTs) fabricated through a template-based fluidic assembly process. We find that these SWCNT networks can withstand DC current densities larger than 10 MA cm(-2) for several hours and, in some cases, several days. We develop test methods that show that the degradation rate, failure predictability and total device lifetime can be linked to the initial resistance. Scanning electron and transmission electron microscopy suggest that fabrication variability plays a critical role in the rate of degradation, and we offer an empirical method of quickly determining the long-term performance of a network. We find that well-fabricated lines subject to constant electrical stress show a linear accumulation of damage reminiscent of electromigration in metallic interconnects, and we explore the underlying physical mechanisms that could cause such behavior.

  6. Reliability through markets in Ontario : submission by the Independent Electricity Market Operator to the Minister of Energy's Consultation Process

    International Nuclear Information System (INIS)

    2003-01-01

    For the past five years, Ontario has invested $1 billion to restructure and open its electricity market to competition. In recent months, and in response to residential consumers pricing concerns, the Independent Electricity Market Operator (IMO) transferred credits to local distribution companies allowing them to issue $75 rebates to all affected customers as of December 1, 2002, and to bill low-volume and other designated customers at a rate of 4.3 cents per kilowatt hour for the commodity portion of their bills. This report addresses the concern that price responsiveness will be lost for those parts of the market with fixed prices. It was noted that the reliability of the power system could be placed at risk if the range of customers with fixed prices is broadened. Fixed prices would also jeopardize the province's ability to attract new supply and enhance competition in the electricity sector. The IMO believes that price responsiveness in the wholesale market is crucial to the reliability of the electricity system and recommends that a plan for any additional fixed pricing should include a clearly defined phase-out over the period ending in 2006 as new supply comes on-line. The IMO emphasizes that the lack of price responsiveness to the market, particularly in peak energy demand periods, is equivalent to adding hundreds of MW to the load. The report presents lessons learned in other jurisdictions and highlights noteworthy considerations such as the market power mitigation agreement, improving competition, a phased-in approach, and demand side initiatives

  7. Council dinner

    CERN Multimedia

    1980-01-01

    Jean Teillac (President of the Council) gives the speech. The occasion was the end-of-term of Leon Van Hove and John Adams as Research and Executive Director-General, respectively, to be succeeded by Herwig Schopper. The venue was the Hotel Beau-Rivage in Geneva. Beside Jean Teillac are (on the left) G.H. Stafford and Mme Van Hove, (on the right) Mme Schopper.

  8. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  9. Preparing for climate change regulation : an assessment of the current state of date reliability in the Canadian electrical industry

    International Nuclear Information System (INIS)

    Schuh, C.

    2003-01-01

    This presentation provided an overview of current Canadian greenhouse gas (GHG) reporting requirements, predictions about GHG regulations, and the current state of GHGs data reliability in the Canadian electrical industry. The author argued that while potential management strategies are necessary, they are not sufficient to meet Kyoto or similar types of initiatives because they do not provide incentives for reductions, they do not establish accountability, nor do they encourage reliable data. It was predicted that the first climate change regulation will be a sectoral agreement enacted at the federal/provincial level. It was also predicted that future regulations will include a requirement to report GHG emissions in a reliable manner and that regulators will use the data to track performance. The final prediction was that the onus will be on the companies to prove that the data is reliable as regulators will have limited resources to check the data. It was noted that the current state of data is not suitable for analytical testing because of a lack of clear definitions, a lack of industry comparison, inability to compare between companies, inability to compare between different types of power generation, and the inability to compare between years. It was suggested that data reliability could be improved by having the regulators review and monitor the reported data, or by having a third party review and provide assurance on the reported data. It was concluded that there will have to be agreement at the industry level on common measurement and calculation methodology, as well as an agreement on a common scope of reporting. 4 figs

  10. Competitive electric power markets and grid reliability : something has changed during the past decade

    International Nuclear Information System (INIS)

    Fluckiger, K.

    2005-01-01

    This white paper reviewed some of the fundamental changes in the way in which electricity is provided to customers. Previously, electricity was delivered by integrated electric utilities that owned both generation and transmission and directly served their customers. Restructuring altered the rules that govern control, operation, ownership and regulation of the industry. The traditional integrated utility has been disaggregated. Wholesale electricity costs are no longer regulated and prices are now set by supply and demand in a market context. Generation investment decisions are based on future expectations of market performance. It was suggested that transmission should become a facilitator of the competitive market. Inter-ties are an essential part of a competitive market, as a means to import power when needed and to export surplus energy. The role of transmission in facilitating new generation by providing non-discriminatory and efficient transport to the market was discussed. It was noted that the lack of transmission investment is resulting in economic penalties, rising losses and constraints on more economic generators. Transmission congestion is counterproductive to the interests of customers. A move away from regional planning to a recognition of the wider interconnectedness of the system was recommended. The current practice of deferring necessary maintenance as a way to generate short-term profit was examined. It was noted that despite the need for new transmission infrastructure, investment in merchant alternating current projects has been slow to materialize. Other challenges to transmission included the uncertainty of regulatory processes and investment recovery as well as the unpredictability of flow patterns in the bulk power system. It was concluded that competitive generation markets will not work with an inadequate transmission infrastructure. Transmission enables new generation by ensuring non-discriminatory and efficient transport to market

  11. RELIABILITY ANALYSIS OF THE ELECTRICAL POWER DISTRIBUTION SYSTEM TO SELECTED PORTIONS OF THE NUCLEAR HVAC SYSTEM

    International Nuclear Information System (INIS)

    Ramirez, N.

    2004-01-01

    A design requirement probability of 0.01 or less in a 4-hour period ensures that the nuclear heating, ventilation, and air-conditioning (HVAC) system in the primary confinement areas of the Dry Transfer Facilities (DTFs) and Fuel Handling Facility (FHF) is working during a Category 1 drop event involving commercial spent nuclear fuel (CSNF) assemblies (BSC 2004a , Section 5.1.1.48). This corresponds to an hourly HVAC failure rate of 2.5E-3 per hour or less, which is contributed to by two dominant causes: equipment failure and loss of electrical power. Meeting this minimum threshold ensures that a Category 1 initiating event followed by the failure of HVAC is a Category 2 event sequence. The two causes for the loss of electrical power include the loss of offsite power and the loss of onsite power distribution. Thus, in order to meet the threshold requirement aforementioned, the failure rate of mechanical equipment, loss of offsite power, and loss of onsite power distribution must be less than or equal to 2.5E-3 per hour for the nuclear HVAC system in the primary confinement areas of the DTFs and FHF. The loss of offsite power occurs at a frequency of 1.1E-5 per hour (BSC 2004a, Section 5.1.1.48). The purpose of this analysis is to determine the probability of occurrence of the unavailability of the nuclear HVAC system in the primary confinement areas of the DTFs and FHF due to loss of electrical power. In addition, this analysis provides insights on the contribution to the unavailability of the HVAC system due to equipment failure. The scope of this analysis is limited to finding the frequency of loss of electrical power to the nuclear HVAC system in the primary confinement areas of the DTFs and FHF

  12. The effect of plant reliability improvement in the cost of generating electricity

    International Nuclear Information System (INIS)

    Nejat, S.; Sanders, R.C.; Tsoulfanidis, N.

    1982-01-01

    The objective of this investigation is to study the economic benefits in operating a nuclear power plant, as a result of improving the availability of the secondary (steam) loop of the plant. A new method has been developed to obtain availability, frequency of failure, probability and frequency of operation, cycle time, and uptime for different capacity states of a parallel series system having components with failure and repair rates distributed exponentially in time. The method has been applied to different subsystems, systems, and the secondary loop of a plant as a whole. The effect of having spare parts for several components, as measured by savings in the generation of electricity, is also studied. The Kettelle algorithm was applied to determine optimal allocation of spare parts to achieve maximum availability or minimum cost of electricity, subject to a fixed spare parts budget. The savings per year for optimal spare parts allocation and different spare parts budgets were obtained. The results show that the utility will save its customers a large amount of money if spare parts are purchased, especially at the beginning of the plant operation, and are allocated judiciously

  13. Reliability centered maintenance as an optimization tool for electrical power plants

    International Nuclear Information System (INIS)

    Jacquot, J.P.; Bryla, P.; Martin-Mattei, C.; Meuwisse, C.

    1997-08-01

    Seven years ago, Electricite de France launched a Reliability Centered Maintenance (RCM) pilot project to optimize preventive maintenance for its nuclear power plants. After a feasibility study, a RCM method was standardized. It is now applied on a large scale to the 50 EDF nuclear units. A RCM workstation based on this standardized method has been developed and is now used in each plant. In the next step, it is considered whether a Risk based Approach can be included in this RCM process in order to analyze critical passive components such as pipes and supports. Considering the potential advantages of these optimization techniques, a dedicated process has been also developed for maintenance of future plants, gas turbines, or nuclear units. A survey of these different developments of methods and tools is presented. (author)

  14. The impact of faulty response of overload protection systems on the reliability of electricity supply

    International Nuclear Information System (INIS)

    Schweigert, J.; Schnuerer, G.

    1988-01-01

    Protection equipment of the engineered safety system which is to prevent the triggering of actions via signals from the reactor protection system is to be made so reliable that it has no impact on the non-availability of the supplied systems. Design and functional mode of the various overload protection equipment and the relevant switching device and combinations are explained together with the requirements such as choice, design, and adjustment of the protection equipment, followed by a survey of possible causes of faulty response of overload protection device and of the means and measures available for improvement. The now presented version of September 1987 of the 'overload protection report deals basically with all main topics of the Juli 1985 version, but has been updated and extended by material taking into account practice-oriented data on the new developments in convoy power plant design. (orig./HP) [de

  15. Electric deregulation in Texas : the next steps

    International Nuclear Information System (INIS)

    Giuliani, R.

    2004-01-01

    This presentation provided a look at the deregulated market in Texas and provided some statistics and facts about the Electric Reliability Council of Texas (ERCOT) which monitors the reliability of 37,000 miles of power transmission lines and 77,000 MW of generation. The governance adopted by ERCOT was described along with market design and wholesale operation in terms of open access to transmission and distribution systems, reliability, timely conveyance of information needed to support customer choice, and accurate accountability for electricity production and delivery. Transmission has been one the greatest challenges facing ERCOT, but retail operations are progressing well despite initial start-up problems. tabs., figs

  16. Reliability evaluation of the power supply of an electrical power net for safety-relevant applications

    International Nuclear Information System (INIS)

    Dominguez-Garcia, Alejandro D.; Kassakian, John G.; Schindall, Joel E.

    2006-01-01

    In this paper, we introduce a methodology for the dependability analysis of new automotive safety-relevant systems. With the introduction of safety-relevant electronic systems in cars, it is necessary to carry out a thorough dependability analysis of those systems to fully understand and quantify the failure mechanisms in order to improve the design. Several system level FMEAs are used to identify the different failure modes of the system and, a Markov model is constructed to quantify their probability of occurrence. A new power net architecture with application to new safety-relevant automotive systems, such as Steer-by-Wire or Brake-by-Wire, is used as a case study. For these safety-relevant loads, loss of electric power supply means loss of control of the vehicle. It is, therefore, necessary and critical to develop a highly dependable power net to ensure power to these loads under all circumstances

  17. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Sandra R.; Johnson, Melvin; McClevey, Kenneth; Calopedis, Stephen; Bolden, Deborah

    1992-05-01

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed for the North American Electric Reliability Council (NERC) regions. Additionally, statistics by company and plant are published in the EPM on capability of new plants, new generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel.

  18. Final Report to the National Energy Technology Laboratory on FY09-FY13 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    Energy Technology Data Exchange (ETDEWEB)

    Vittal, Vijay [Arizona State Univ., Mesa, AZ (United States)

    2015-11-04

    The Consortium for Electric Reliability Technology Solutions (CERTS) was formed in 1999 in response to a call from U.S. Congress to restart a federal transmission reliability R&D program to address concerns about the reliability of the U.S. electric power grid. CERTS is a partnership between industry, universities, national laboratories, and government agencies. It researches, develops, and disseminates new methods, tools, and technologies to protect and enhance the reliability of the U.S. electric power system and the efficiency of competitive electricity markets. It is funded by the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE). This report provides an overview of PSERC and CERTS, of the overall objectives and scope of the research, a summary of the major research accomplishments, highlights of the work done under the various elements of the NETL cooperative agreement, and brief reports written by the PSERC researchers on their accomplishments, including research results, publications, and software tools.

  19. A roadmap for production of sustainable, consistent and reliable electric power from agricultural biomass- An Indian perspective

    International Nuclear Information System (INIS)

    Singh, Jaswinder

    2016-01-01

    The utilization of agricultural biomass for production of electric power can help to reduce the environmental emissions while achieving energy security and sustainable development. This paper presents a methodology for estimating the power production potential of agricultural biomass in a country. Further, the methodology has been applied to develop a roadmap for producing reliable power in India. The present study reveals that about 650 Mt/year of agricultural biomass is generated in India, while about one-third of this has been found to be surplus for energy applications. The cereal crops have major contribution (64.60%) in production of surplus biomass followed by sugarcane (24.60%) and cotton (10.68%). The energy potential of these resources is of the order of 3.72 EJ, which represents a significant proportion of the primary energy consumption in the country. These biomass resources can produce electric power of 23–35 GW depending upon the efficiency of thermal conversion. The delivery of biomass to the plants and selection of appropriate technology have been found as the major issues that need to be resolved carefully. In the end, the study summarizes various technological options for biomass collection and utilization that can be used for producing clean and consistent power supply. - Highlights: •The production of bioelectricity in India is imperative and inevitable. •About one-third of the agricultural biomass is available for power generation. •The power potential of these resources is of the order of 23–31 GW. •The delivery of biomass to plants and technology selection are the key issues. •India should exploit these resources for producing clean and reliable power.

  20. Hybrid instrument applied to human reliability study in event of loss of external electric power in a nuclear power plant

    International Nuclear Information System (INIS)

    Martins, Eduardo Ferraz

    2015-01-01

    The study projects in highly complex installations involves robust modeling, supported by conceptual and mathematical tools, to carry out systematic research and structured the different risk scenarios that can lead to unwanted events from occurring equipment failures or human errors. In the context of classical modeling, the Probabilistic Safety Analysis (PSA) seeks to provide qualitative and quantitative information about the project particularity and their operational facilities, including the identification of factors or scenarios that contribute to the risk and consequent comparison options for increasing safety. In this context, the aim of the thesis is to develop a hybrid instrument (CPP-HI) innovative, from the integrated modeling techniques of Failure Mode and Effect Analysis (FMEA), concepts of Human Reliability Analysis and Probabilistic Composition of Preferences (PCP). In support of modeling and validation of the CPP-HI, a simulation was performed on a triggering event 'Loss of External Electric Power' - PEEE, in a Nuclear Power plant. The results were simulated in a virtual environment (sensitivity analysis) and are robust to the study of Human Reliability Analysis (HRA) in the context of the PSA. (author)

  1. Electric power monthly, August 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-13

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  2. Electric power monthly, September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-17

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  3. Study of reliability for the electricity cogeneration and seawater desalination in the Northwest of Mexico

    International Nuclear Information System (INIS)

    Hernandez U, G. O.; Ortega C, R. F.

    2008-01-01

    were costs very competitive of 0.038-0.044 $/ kWh for the production of electric energy and of 0.60 at 0.77 $/ m 3 for the produced water, with a lost of power in the generation of among 28 to 43 MW e . (Author)

  4. A model for reliability avaliation of the electrical supply source of the 1A3 and 1A4 control rods assemblies of Angra I reactor

    International Nuclear Information System (INIS)

    Yang, T.

    1978-01-01

    The reliability of the electrical power supply to the 4.16KV buses for the safety system operation of a nuclear power plant was studied. Particularly, Angra Unit I system was focused. Initially, reliability of each electrical supply source was estimated. Using a probabilistic approach based on the Markov processes, the system reliability was evaluated in terms of frequency and duration of loss of power supply and of the system failure probability evolution when one or more sources remained unavailable. Based on these results, certain reactor operating rules were proposed concerning later shutdown of the plant without compromising the nuclear reactor safety. A sensitivity analysis was also performed to show the different reliability parameter influences on final results. This analysis showed that the diesel system performs an important role in the power supply for a nuclear power plant [pt

  5. Electric power monthly, April 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the U.S., Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. This April 1994 issue contains 1993 year-end data and data through January 1994.

  6. Electric power monthly, April 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national Census division, and State level. The purpose of this publication is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data are given for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatt hour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, statistics at the company and plant level are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 6 figs., 57 tabs

  7. On-site A.C. electric power sources for 900 MWe French nuclear power reactors: reliability and importance for safety

    Energy Technology Data Exchange (ETDEWEB)

    Milhem, J. L.; Gros, G. [Commissariat a l' Energie Atomique, Institut de Protection et Surete Nucleaire, Departement d' Analyse de Surete, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    After presenting briefly the new provisions laid down by the Electricite de France to meet a total electrical power loss, the main elements of the probabilistic study concerning the corresponding risk described: reliability data of internal sources used, results of risk Improvement brought by the new measures, importance for Internal source before and after Implementation of the new measures. (authors)

  8. On-site A.C. electric power sources for 900 MWe french nuclear power reactors: reliability and importances for safety

    International Nuclear Information System (INIS)

    Milhem, J.L.; Gros, G.

    1985-10-01

    After presenting briefly the new provisions laid down by the Electricite de France to meet a total electrical power loss, the main elements of the probabilistic study concerning the corresponding risk are described: reliability data of internal sources used, results of risk improvement brought by the new measures, importance for internal source before and after implementation of the new measures

  9. Reliability of the electric power supply in the safety apparatus of nuclear power plants: a comparative analysis

    International Nuclear Information System (INIS)

    Cruz, L.A.

    1992-01-01

    This paper discusses the risk of total loss of electric power supply to the Class 1E system. Two alternatives are focused: a system with two off-site and two onsite power supplies emergency power supply, as recommended by the American Regulations, and a system with only one off-site and four on-site power supplies, applicable when two off-site are not available. To allow the fact that the equipment can be repaired, the method proper involves use of the Markov model, with which one can find, for each configuration of the system, the change over time of the probability of a simultaneous failure of all power sources. The sensitivity of each parameter is studied in each case and, on the basis of the results of the study, the author conclude that the system with two off-site power supplies is preferable in all alternatives analysed, although the system with one off-site power supply can be adopted with high reliability diesel-generators. (author)

  10. Evaluation of the reliability of electric power transmission systems; Evaluacion de confiabilidad de sistemas de transmision de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Vega Ortiz, Miguel

    1989-07-01

    In this thesis it is attacked the problem of Reliability Evaluation of the Electrical Power Transmission Systems for aims of its integral planning. Once described the problem the indexes that measure the electric power systems reliability are presented. Later the methods to evaluate the transmission nets, such as the Contingencies Enumeration, the Monte Carlo, the one of Markov and the methods for complex systems such as the Minimum Interruptions, are described. This last one is widely developed for the advantages that its application presents in the planning of large and complex networks. The method of minimum interruptions consists of two big steps: To determine the minimum interruptions for the load points and to calculate the reliability indexes in base of the minimum interruptions. The conventional algorithms for the determination of minimum interruptions consider a problem for each load point in an independent form going through a determination of minimum tracks. In this type of algorithms the CPU time and the space in memory required grow exponentially for the case of large transmission systems, which represents a strong restriction for its application. In order to solve this problem a methodology was established in which the system is modeled by means of a grapho and the minimum interruptions are determined with an algorithm based on the construction of cycles in the dual grapho. With these interruptions the connectivity and the capacity of the network is evaluated, obtaining the reliability indexes for each bus and the system. These indexes are calculated with the equivalent representation for complex systems of series parallel connections defined by the minimum interruptions. One of the fundamental objectives in this study is to integrate the reliability to the planning process, with the concept of the expected value of the non-supplied energy and its penalty cost. In order to demonstrate the capacity, effectiveness and rapidity of the new implemented

  11. BECCS Market Launch Strategy Aiming to Help Ensure Reliable Grid Power at High Penetrations of IRE (Intermittent Renewable Electricity)

    Science.gov (United States)

    WIlliams, R. H.

    2017-12-01

    Despite its recognized importance for carbon (C)-mitigation, progress in advancing biomass energy with CO2 capture and sequestration (BECCS) has been slow. A BECCS market launch strategy based on technologies ready for commercial-scale demonstration is discussed—based on co-gasification of coal and biomass to make H2 with CCS. H2 so produced would be a key element of a H2 balancing capacity (H2-BC) strategy for ensuring reliable grid power at high IRE penetrations. High grid penetrations of IRE must be complemented by fast-ramping balancing (backup and/or storage) capacity (BC) to ensure reliable grid power. BC provided now by natural gas-fired gas turbine combined cycle and combustion turbine units would eventually have to be decarbonized to realize C-mitigation goals, via CCS or other means. Capital-intensive CCS energy systems require baseload operation to realize favourable economics, but at high IRE penetrations, BC plants must be operated at low capacity factors. A H2-BC strategy is a promising way to address this challenge. The elements of a H2-BC system are: (a) H2 production from carbonaceous feedstocks in baseload plants with CCS; (b) H2 consumption in fast-ramping BC units that operate at low capacity factors; (c) Buffer underground H2 storage to enable decoupling baseload H2 production from highly variable H2 consumption by BC units. The concept is likely to "work" because underground H2 storage is expected to be inexpensive. A H2 production analysis is presented for a negative GHG-emitting H2-BC system based on cogasification of corn stover and coal, with captured CO2 used for enhanced oil recovery. The technical readiness of each system component is discussed, and preliminary insights are offered as to the conditions under which the corresponding H2-BC system might compete with natural gas in providing backup for IRE on US electric grids. Public policy to help advance this strategy might be forthcoming, because 2 US Senate bills with broad

  12. Guide to the collection and presentation of electrical, electronic, and sensing component reliability data for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    This Guide is intended to establish a method of collecting and presenting reliability data for quantitative systematic reliability analysis in nuclear power generating stations, as outlined in IEEE Std 351-1975. Appendix D, which is not a part of IEEE Std 500-1977 but which comprises the bulk of this publication, presents tables of reliability data for nuclear power generating stations, intended for use of nuclear systems reliability analysts or design engineers

  13. Accuracy and reliability of noninvasive stroke volume monitoring via ECG-gated 3D electrical impedance tomography in healthy volunteers

    Science.gov (United States)

    Proença, Martin; Adler, Andy; Riedel, Thomas; Thiran, Jean-Philippe; Solà, Josep

    2018-01-01

    Cardiac output (CO) and stroke volume (SV) are parameters of key clinical interest. Many techniques exist to measure CO and SV, but are either invasive or insufficiently accurate in clinical settings. Electrical impedance tomography (EIT) has been suggested as a noninvasive measure of SV, but inconsistent results have been reported. Our goal is to determine the accuracy and reliability of EIT-based SV measurements, and whether advanced image reconstruction approaches can help to improve the estimates. Data were collected on ten healthy volunteers undergoing postural changes and exercise. To overcome the sensitivity to heart displacement and thorax morphology reported in previous work, we used a 3D EIT configuration with 2 planes of 16 electrodes and subject-specific reconstruction models. Various EIT-derived SV estimates were compared to reference measurements derived from the oxygen uptake. Results revealed a dramatic impact of posture on the EIT images. Therefore, the analysis was restricted to measurements in supine position under controlled conditions (low noise and stable heart and lung regions). In these measurements, amplitudes of impedance changes in the heart and lung regions could successfully be derived from EIT using ECG gating. However, despite a subject-specific calibration the heart-related estimates showed an error of 0.0 ± 15.2 mL for absolute SV estimation. For trending of relative SV changes, a concordance rate of 80.9% and an angular error of −1.0 ± 23.0° were obtained. These performances are insufficient for most clinical uses. Similar conclusions were derived from lung-related estimates. Our findings indicate that the key difficulty in EIT-based SV monitoring is that purely amplitude-based features are strongly influenced by other factors (such as posture, electrode contact impedance and lung or heart conductivity). All the data of the present study are made publicly available for further investigations. PMID:29373611

  14. Proceedings of the Canadian Institute's 3. annual conference on generation adequacy in Ontario : strategies to increase capacity to ensure a reliable electricity supply in Ontario

    International Nuclear Information System (INIS)

    2006-01-01

    This conference provided a forum for the discussion of issues related to generation adequacy in Ontario. Members of the electricity industry as well as members from governmental and non-governmental agencies discussed a variety of recommendations for cost-effective reliable energy in Ontario. Issues related to the overhaul or replacement of nuclear power reactors and coal-fired generators in the province were reviewed. The status of various wind power projects in the province was examined along with issues related to interconnected power systems. Best practices for the planning and execution of electricity infrastructure projects were also reviewed, and issues related to stakeholder involvement in electricity generation projects were discussed. The discussions also described recent developments in electricity generation in various jurisdictions in Canada and the United States. The conference featured 19 presentations, of which 7 have been catalogued separately for inclusion in this database. tabs., figs

  15. Electric-stress reliability and current collapse of different thickness SiNx passivated AlGaN/GaN high electron mobility transistors

    International Nuclear Information System (INIS)

    Ling, Yang; Gui-Zhou, Hu; Yue, Hao; Xiao-Hua, Ma; Si, Quan; Li-Yuan, Yang; Shou-Gao, Jiang

    2010-01-01

    This paper investigates the impact of electrical degradation and current collapse on different thickness SiN x passivated AlGaN/GaN high electron mobility transistors. It finds that higher thickness SiN x passivation can significantly improve the high-electric-field reliability of a device. The degradation mechanism of the SiN x passivation layer under ON-state stress has also been discussed in detail. Under the ON-state stress, the strong electric-field led to degradation of SiN x passivation located in the gate-drain region. As the thickness of SiN x passivation increases, the density of the surface state will be increased to some extent. Meanwhile, it is found that the high NH 3 flow in the plasma enhanced chemical vapour deposition process could reduce the surface state and suppress the current collapse. (condensed matter: electronic structure, electrical, magnetic, and optical properties)

  16. Effect of Heat and Electricity Storage and Reliability on Microgrid Viability:A Study of Commercial Buildings in California and New York States

    Energy Technology Data Exchange (ETDEWEB)

    Stadler, Michael; Marnay, Chris; Siddiqui, Afzal; Lai, Judy; Coffey, Brian; Aki, Hirohisa

    2008-12-01

    In past work, Berkeley Lab has developed the Distributed Energy Resources Customer Adoption Model (DER-CAM). Given end-use energy details for a facility, a description of its economic environment and a menu of available equipment, DER-CAM finds the optimal investment portfolio and its operating schedule which together minimize the cost of meeting site service, e.g., cooling, heating, requirements. Past studies have considered combined heat and power (CHP) technologies. Methods and software have been developed to solve this problem, finding optimal solutions which take simultaneity into account. This project aims to extend on those prior capabilities in two key dimensions. In this research storage technologies have been added as well as power quality and reliability (PQR) features that provide the ability to value the additional indirect reliability benefit derived from Consortium for Electricity Reliability Technology Solutions (CERTS) Microgrid capability. This project is intended to determine how attractive on-site generation becomes to a medium-sized commercial site if economical storage (both electrical and thermal), CHP opportunities, and PQR benefits are provided in addition to avoiding electricity purchases. On-site electrical storage, generators, and the ability to seamlessly connect and disconnect from utility service would provide the facility with ride-through capability for minor grid disturbances. Three building types in both California and New York are assumed to have a share of their sensitive electrical load separable. Providing enhanced service to this load fraction has an unknown value to the facility, which is estimated analytically. In summary, this project began with 3 major goals: (1) to conduct detailed analysis to find the optimal equipment combination for microgrids at a few promising commercial building hosts in the two favorable markets of California and New York; (2) to extend the analysis capability of DER-CAM to include both heat and

  17. Innovative protection and control systems for a reliable and secure operation of electrical transmission systems; Innovative Schutz- und Leitsysteme zur zuverlaessigen und sicheren elektrischen Energieuebertragung

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Sven C.; Kubis, Adreas; Rehtanz, Christian [Technische Univ. Dortmund (Germany). Inst. fuer Energiesysteme, Energieeffizienz und Energiewirtschaft (ie3); Brato, Sebastian; Goetze, Juergen [Technische Univ. Dortmund (Germany). Arbeitsgebiet Datentechnik

    2012-07-01

    The integration of European electricity markets as well as the increasing power feed-in by renewable energy sources pose new challenges to the operation of electrical transmission systems. Modern protection and control systems based on wide-area information can substantially contribute to a reliable and secure system operation even against the background of future demands. In this paper research advances regarding new applications for wide-area monitoring, protection and control as well as an integrated simulation for power and ICT systems are presented that have been developed in the course of DFG research unit FOR1511 at TU Dortmund. (orig.)

  18. Electric power monthly, January 1991. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-17

    This publication provides monthly statistics at the national, Census division, and state levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 4 figs., 48 tabs.

  19. Electric power monthly, October 1991. [CONTAINS GLOSSARY

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-11

    This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, statistics at the company and plant level are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 4 figs., 63 tabs.

  20. Electric Power Monthly, September 1991. [CONTAINS GLOSSARY

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-12

    This publication provides monthly statistics at the national, Census division, and state levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, statistics at the company and plant level are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 4 figs., 63 tabs.

  1. National Safety Council

    Science.gov (United States)

    ... work, in homes and communities, and on the road through leadership, research, education and advocacy. NSC Newsletter Sign up for our newsletter! Like Us on Facebook National Safety Council © National Safety Council. All rights reserved. Contact ...

  2. APA Council Reports.

    Science.gov (United States)

    2017-10-01

    At the fall component meetings of the American Psychiatric Association in Arlington, Va., September 13-16, 2017, the APA councils heard reports from their components. Following are summaries of the activities of the councils and their components.

  3. A case study review of technical and technology issues for transition of a utility load management program to provide system reliability resources in restructured electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Weller, G.H.

    2001-07-15

    Utility load management programs--including direct load control and interruptible load programs--were employed by utilities in the past as system reliability resources. With electricity industry restructuring, the context for these programs has changed; the market that was once controlled by vertically integrated utilities has become competitive, raising the question: can existing load management programs be modified so that they can effectively participate in competitive energy markets? In the short run, modified and/or improved operation of load management programs may be the most effective form of demand-side response available to the electricity system today. However, in light of recent technological advances in metering, communication, and load control, utility load management programs must be carefully reviewed in order to determine appropriate investments to support this transition. This report investigates the feasibility of and options for modifying an existing utility load management system so that it might provide reliability services (i.e. ancillary services) in the competitive markets that have resulted from electricity industry restructuring. The report is a case study of Southern California Edison's (SCE) load management programs. SCE was chosen because it operates one of the largest load management programs in the country and it operates them within a competitive wholesale electricity market. The report describes a wide range of existing and soon-to-be-available communication, control, and metering technologies that could be used to facilitate the evolution of SCE's load management programs and systems to provision of reliability services. The fundamental finding of this report is that, with modifications, SCE's load management infrastructure could be transitioned to provide critical ancillary services in competitive electricity markets, employing currently or soon-to-be available load control technologies.

  4. Degree of Fault Tolerance as a Comprehensive Parameter for Reliability Evaluation of Fault Tolerant Electric Traction Drives

    Directory of Open Access Journals (Sweden)

    Igor Bolvashenkov

    2016-09-01

    Full Text Available This paper describes a new approach and methodology of quantitative assessment of the fault tolerance of electric power drive consisting of the multi-phase traction electric motor and multilevel electric inverter. It is suggested to consider such traction drive as a system with several degraded states. As a comprehensive parameter for evaluating of the fault tolerance, it is proposed to use the criterion of degree of the fault tolerance. For the approbation of the proposed method, the authors carried out research and obtained results of its practical application for evaluating the fault tolerance of the power train of an electrical helicopter.

  5. Final Report to the National Energy Technology Laboratory on FY14- FY15 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    Energy Technology Data Exchange (ETDEWEB)

    Vittal, Vijay [Arizona State Univ., Tempe, AZ (United States); Lampis, Anna Rosa [Arizona State Univ., Tempe, AZ (United States)

    2018-01-16

    The Power System Engineering Research Center (PSERC) engages in technological, market, and policy research for an efficient, secure, resilient, adaptable, and economic U.S. electric power system. PSERC, as a founding partner of the Consortium for Electric Reliability Technology Solutions (CERTS), conducted a multi-year program of research for U.S. Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) to develop new methods, tools, and technologies to protect and enhance the reliability and efficiency of the U.S. electric power system as competitive electricity market structures evolve, and as the grid moves toward wide-scale use of decentralized generation (such as renewable energy sources) and demand-response programs. Phase I of OE’s funding for PSERC, under cooperative agreement DE-FC26-09NT43321, started in fiscal year (FY) 2009 and ended in FY2013. It was administered by DOE’s National Energy Technology Laboratory (NETL) through a cooperative agreement with Arizona State University (ASU). ASU provided sub-awards to the participating PSERC universities. This document is PSERC’s final report to NETL on the activities for OE, conducted through CERTS, from September 2015 through September 2017 utilizing FY 2014 to FY 2015 funding under cooperative agreement DE-OE0000670. PSERC is a thirteen-university consortium with over 30 industry members. Since 1996, PSERC has been engaged in research and education efforts with the mission of “empowering minds to engineer the future electric energy system.” Its work is focused on achieving: • An efficient, secure, resilient, adaptable, and economic electric power infrastructure serving society • A new generation of educated technical professionals in electric power • Knowledgeable decision-makers on critical energy policy issues • Sustained, quality university programs in electric power engineering. PSERC core research is funded by industry, with a budget supporting

  6. Endorsement obligation of the Federal council for the atomic legally regulated increase in production of the ''residual quantities of electricity'' and the associated lifetime extension of nuclear power plants?; Zustimmungspflicht des Bundesrates fuer die atomgesetzlich zu regelnde Produktionserhoehung der ''Reststrommengen'' und der damit verbundenen Laufzeitverlaengerungen von Kernkraftwerken?

    Energy Technology Data Exchange (ETDEWEB)

    Kotulla, Michael [Bielefeld Univ. (Germany). Lehrstuhl fuer Oeffentliches Recht insbesondere Umweltrecht; Kilic, Ali

    2010-12-15

    The authors of the contribution under consideration report on the problem whether an increase in electricity by nuclear power plants due to a longer residual lifetime require the consent of the Federal Council. The authors show the amazingly unambiguous legal position on the basis of the constitutional law.

  7. Electric power monthly, February 1998 with data for November 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The Electric Power Monthly (EPM) provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 63 tabs.

  8. Electric Power Monthly, September 1995: With data for June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  9. Electric power monthly: April 1996, with data for January 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatt hour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 64 tabs.

  10. Electricity

    CERN Document Server

    Basford, Leslie

    2013-01-01

    Electricity Made Simple covers the fundamental principles underlying every aspect of electricity. The book discusses current; resistance including its measurement, Kirchhoff's laws, and resistors; electroheat, electromagnetics and electrochemistry; and the motor and generator effects of electromagnetic forces. The text also describes alternating current, circuits and inductors, alternating current circuits, and a.c. generators and motors. Other methods of generating electromagnetic forces are also considered. The book is useful for electrical engineering students.

  11. The Electricity Feed Law levy - how reliably can it be predicted?; Wie verlaesslich laesst sich die EEG-Umlage prognostizieren?

    Energy Technology Data Exchange (ETDEWEB)

    Bause, Rainer; Schulz, Woldemar [Amprion GmbH, Dortmund (Germany); Buehler, Holger [EnBW TNG, Stuttgart (Germany); Hodurek, Claus [50Hertz Transmission GmbH, Berlin (Germany); Kiessling, Axel [TenneT TSO GmbH, Bayreuth (Germany)

    2011-10-15

    By paying their monthly electricity bill German consumers are promoting the transition to tomorrow's resource-efficient electricity supply system, in which the largest part of electricity used is to come from renewable energy resources. Every year Germany's transmission system operators publish what is referred to as the ''EEG-Umlage'' (report on the Electricity Feed Law levy, or EEG levy), which shows how much every German household will be paying for the promotion of renewable energies in the coming year. The determination of the EEG levy involves uncertainties and imponderabilities which have to be taken into account in its calculation. The crucial task is to find a suitable systematic scheme for predicting the renewable energy yield.

  12. Section 4: National Research Council

    International Nuclear Information System (INIS)

    Arseneau, R.; Zelle, J.

    1991-01-01

    A study was carried out to produce a compendium of electric and magnetic field levels in various environments throughout Canada. The contribution of the National Research Council of Canada in cooperation with Ottawa Hydro was to study the magnetic field environment of 29 sites in the Ottawa area, including private residences, place of employment, distribution and transmission lines, and close to padmount transformers. At most sites the electric fields were too low to be measured. Magnetic fields near padmount transformers can be larger than 300 mG, however this rapidly decreases and at 3 feet from the transformers is below 20 mG. Magnetic fields of unbalanced distribution lines can be larger than the fields of balanced lines. The magnetic fields of a high voltage transmission line were measurable at distances up to 100 m from the line. Electric fields were low outside the right-of-way. 6 refs., 4 figs., 2 tabs

  13. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO2 Gate Dielectrics by CF4 Plasma Treatment

    Science.gov (United States)

    Fan, Ching-Lin; Tseng, Fan-Ping; Tseng, Chiao-Yuan

    2018-01-01

    In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs) with a HfO2 gate insulator and CF4 plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO2 gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm2/V∙s (without treatment) to 54.6 cm2/V∙s (with CF4 plasma treatment), which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO2 gate dielectric has also been improved by the CF4 plasma treatment. By applying the CF4 plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device’s immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF4 plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO2 gate dielectric, but also enhances the device’s reliability. PMID:29772767

  14. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO2 Gate Dielectrics by CF4 Plasma Treatment

    Directory of Open Access Journals (Sweden)

    Ching-Lin Fan

    2018-05-01

    Full Text Available In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs with a HfO2 gate insulator and CF4 plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO2 gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm2/V∙s (without treatment to 54.6 cm2/V∙s (with CF4 plasma treatment, which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO2 gate dielectric has also been improved by the CF4 plasma treatment. By applying the CF4 plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device’s immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF4 plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO2 gate dielectric, but also enhances the device’s reliability.

  15. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO₂ Gate Dielectrics by CF₄ Plasma Treatment.

    Science.gov (United States)

    Fan, Ching-Lin; Tseng, Fan-Ping; Tseng, Chiao-Yuan

    2018-05-17

    In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs) with a HfO₂ gate insulator and CF₄ plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO₂ gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm²/V∙s (without treatment) to 54.6 cm²/V∙s (with CF₄ plasma treatment), which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO₂ gate dielectric has also been improved by the CF₄ plasma treatment. By applying the CF₄ plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device's immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF₄ plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO₂ gate dielectric, but also enhances the device's reliability.

  16. More efficient policy of energy and regional electricity supply by the directive 96/92/EC of the European Parliament and of the Council of 10 december 1996 concerning common rules for the internal market in electricity; Effizientere Energiepolitik und regionale Elektrizitaetsversorgung durch die EU-Elektrizitaetsrichtlinie 1996. Politikfeldanalyse der europaeischen, deutschen und bayerischen Energiepolitik und Elektrizitaetswirtschaft im Zusammenhang mit der Entstehung und Umsetzung der EU-Richtlinie 96 sowie der Veraenderung der Effizienz in der traditionellen Elektrizitaetsversorgung unter supranationalem EU-Einfluss

    Energy Technology Data Exchange (ETDEWEB)

    Furtner, Franz

    2006-07-01

    The German energy policy and its main addressees, the regional electricity companies (EVU), are going through a critical phase at the beginning of the 21st century. The increasing complexity and inconsistency of energy issues have, in Germany and in other countries, led to decisions which again have produced extensive, but not yet foreseeable developments, as, for example, the liberalisation of the electricity and gas market within the European Union. The first objective of this paper is an empirical analysis of the regional electricity supply industry in Germany and particularly in Bavaria in so far as it is relevant for energy politics, as well as an introduction to the German energy policy up to approximately the time when the Directive 96/92/EC of the European Parliament and the Council of 19 December 1996 concerning common rules for the internal market in electricity, was passed. Moreover, findings for the definition of energy efficiency in electricity supply and of the policy analysis are outlined. The second objective of this paper is the analysis and evaluation of the European Union energy policy, in particular of the Directive 96/92/EC, its formation and how it has been put into action by the German and Bavarian electricity supply industry. Energy efficiency of the electricity supply serves as a yardstick, the research method employed is the policy analysis. The main part of this paper, by comparing objectives to effects and by evaluating interviews with energy experts, examines the questions if, in what ways and to what extent the Directive 96/92/EC has led to an increase of energy efficiency in the narrow as well as in the boarder sense, within the EU, Germany and Bavaria. Additionally, three hypotheses are tested: firstly the significance of energy efficiency (in the narrow sense), secondly the alignment of European energy supply, and thirdly the importance of supranational control through EU politics. The results are presented in tabular form, and the

  17. System for the reliability analysis of the electric energy supply; Sistema para el analisis de confiabilidad del suministro de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Perales, Favio; Martinez, Javier; Huesca, Francisco; Garcia, Norma; Nieva, Rolando [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    A computer tool, developed for the reliability evaluation of the electric energy supply, considering the faults in the generation and transmission systems, is presented. The application of the tool in planning the expansion and operation of the electric systems, the methodology of the solution employed and the various functions it accounts for, are described. At the end some illustrative examples of its applications by means of the studies with a model of representative characteristics of the interconnected national system. [Espanol] Se presenta una herramienta computacional desarrollada para evaluar la confiabilidad del suministro de energia electrica, considerando las fallas en los sistemas de generacion y transmision. Se describen las aplicaciones de la herramienta en la planeacion de la expansion y de la operacion de sistemas electricos, la metodologia de solucion empleada y las diversas funciones con que cuenta. Al final se presentan algunos ejemplos ilustrativos de sus aplicaciones mediante estudios con un modelo de caracteristicas representativas del sistema interconectado nacional.

  18. System for the reliability analysis of the electric energy supply; Sistema para el analisis de confiabilidad del suministro de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Perales, Favio; Martinez, Javier; Huesca, Francisco; Garcia, Norma; Nieva, Rolando [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    A computer tool, developed for the reliability evaluation of the electric energy supply, considering the faults in the generation and transmission systems, is presented. The application of the tool in planning the expansion and operation of the electric systems, the methodology of the solution employed and the various functions it accounts for, are described. At the end some illustrative examples of its applications by means of the studies with a model of representative characteristics of the interconnected national system. [Espanol] Se presenta una herramienta computacional desarrollada para evaluar la confiabilidad del suministro de energia electrica, considerando las fallas en los sistemas de generacion y transmision. Se describen las aplicaciones de la herramienta en la planeacion de la expansion y de la operacion de sistemas electricos, la metodologia de solucion empleada y las diversas funciones con que cuenta. Al final se presentan algunos ejemplos ilustrativos de sus aplicaciones mediante estudios con un modelo de caracteristicas representativas del sistema interconectado nacional.

  19. IMPROVING THE RELIABILITY OF THE POWER CIRCUIT OF THE ELECTRIC TRAINS ЕР2Т AND ЕПЛ2Т

    Directory of Open Access Journals (Sweden)

    N. H. Visin

    2010-02-01

    Full Text Available The transitional processes in shunt circuit of traction engines, which armatures and excitation windings are connected in non-conducting direction as to the flowing power current, are considered in this paper. The changes in the control circuits of braking switch and in the shunt power circuit of traction engines with additional mounting a resistor of 0.5 Ohm are proposed. All this modernization will allow increasing greatly the operation reliability of power circuit of ЭР2Т and ЕПЛ2Т electric locomotives during their service life.

  20. A Look Back at the Long Path to Mandating Electric Reliability Standards through the Energy Policy Act of 2005

    Energy Technology Data Exchange (ETDEWEB)

    Young, Ellen Swyler

    2006-07-15

    The Act was the culmination of more than eight years of legislative effort in Congress. During this period, the nation saw the Western electricity crisis of 2000-01, the Sept. 11 attacks, the collapse of Enron, the growth of RTOs, and the August 2003 blackout. Each of these influenced the dynamics of the debate. (author)

  1. Low power fluorine plasma effects on electrical reliability of AlGaN/GaN high electron mobility transistor

    International Nuclear Information System (INIS)

    Yang Ling; Zhou Xiao-Wei; Ma Xiao-Hua; Lv Ling; Zhang Jin-Cheng; Hao Yue; Cao Yan-Rong

    2017-01-01

    The new electrical degradation phenomenon of the AlGaN/GaN high electron mobility transistor (HEMT) treated by low power fluorine plasma is discovered. The saturated current, on-resistance, threshold voltage, gate leakage and breakdown voltage show that each experiences a significant change in a short time stress, and then keeps unchangeable. The migration phenomenon of fluorine ions is further validated by the electron redistribution and breakdown voltage enhancement after off-state stress. These results suggest that the low power fluorine implant ion stays in an unstable state. It causes the electrical properties of AlGaN/GaN HEMT to present early degradation. A new migration and degradation mechanism of the low power fluorine implant ion under the off-stress electrical stress is proposed. The low power fluorine ions would drift at the beginning of the off-state stress, and then accumulate between gate and drain nearby the gate side. Due to the strong electronegativity of fluorine, the accumulation of the front fluorine ions would prevent the subsequent fluorine ions from drifting, thereby alleviating further the degradation of AlGaN/GaN HEMT electrical properties. (paper)

  2. Queensland Energy Advisory Council 1984 annual review

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    The Council consists of senior officials of Government Departments involved with various aspects of assessment, production, distribution and utilisation of energy resources. Noted in the annual review are functions of QEAC; activities; overview of Queensland's energy position; non renewable resources; coal; electricity; crude oil; natural gas; PGL; oil shale; uranium; renewable resources; solar energy; wind energy and biomass.

  3. Reliability of offshore wind power production under extreme wind conditions. Deliverable D 9.5. Work Package 9: Electrical grid

    DEFF Research Database (Denmark)

    Cutululis, Nicolaos Antonio; Zeni, Lorenzo

    years, with each year simulated with five random seeds, leading to a total of 25 annual wind power time series for six large offshore wind farms, summing up to a little over 330 wind turbines. Two storm control strategies were used. The analysis involved several aspects inspired from reliability studies....... The aspects investigated are storm events occurrences and durations, storm control strategy impact on the capacity factor (lost production), the loss of production (power produced from wind drops below a certain threshold due to high wind speeds and storm controller) and finally, the wind power production......Reliability of offshore wind production under extreme wind conditions was investigated in this report. The wind power variability from existing and future large offshore wind farms in Western Denmark were simulated using the Correlated Wind model developed at Risø. The analysis was done for five...

  4. ITER council proceedings: 1996

    International Nuclear Information System (INIS)

    1997-01-01

    Records of the 10. ITER Council Meeting (IC-10), held on 26-27 July 1996, in St. Petersburg, Russia, and the 11. ITER Council Meeting (IC-11) held on 17-18 December 1996, in Tokyo, Japan, are presented, giving essential information on the evolution of the ITER Engineering Design Activities (EDA) and the cost review and safety analysis. Figs, tabs

  5. European works councils

    DEFF Research Database (Denmark)

    Knudsen, Herman Lyhne

    2004-01-01

    The theme addressed by this artcle is the opportunities for European Works Councils of gaining influence on corporate decisions in multinational companies.......The theme addressed by this artcle is the opportunities for European Works Councils of gaining influence on corporate decisions in multinational companies....

  6. ITER council proceedings: 1992

    International Nuclear Information System (INIS)

    1994-01-01

    At the signing of the ITER EDA Agreement on July, 1992, each of the Parties presented to the Director General the names of their designated members of the ITER Council. Upon receiving those names, the Director General stated that the ITER Engineering Design Activities were ''ready to begin''. The next step in this process was the convening of the first meeting of the ITER Council. The first meeting of the Council, held in Vienna, was opened by Director General Hans Blix. The second meeting was held in Moscow, the formal seat of the Council. This volume presents records of these first two Council meetings and, together with the previous volumes on the text of the Agreement and Protocol 1 and the preparations for their signing respectively, represents essential information on the evolution of the ITER EDA

  7. Puget Sound Area Electric Reliability Plan. Appendix D, Conservation, Load Management and Fuel Switching Analysis : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

  8. Investigation on the electrical characteristics of a pentacene thin-film transistor and its reliability under positive drain bias stress

    International Nuclear Information System (INIS)

    Fan, Ching-Lin; Chiu, Ping-Cheng; Lin, Yu-Zuo; Yang, Tsung-Hsien; Chiang, Chin-Yuan

    2011-01-01

    This study systematically investigates the effects of pentacene deposition rates and channel lengths on the electrical characteristics of pentacene-based organic thin-film transistors (OTFTs), and the performance degradation of OTFTs under the positive drain bias stress. With a slower deposition rate of the pentacene channel layer, the larger grain size is formed, and it improves the performance of pentacene-based OTFTs. As the channel length decreases, the threshold voltage (V TH ) shifts toward the positive direction and the field-effect mobility (µ FE ) decreases, which are due to the drain-induced barrier lowering effect and the lower mobility in the active channel near the region of source/drain electrodes, respectively. In addition, we also propose a mechanism to present the channel length dependence on the field-effect mobility. Results also show that the pentacene-based OTFTs, which are under positive drain bias stress, exhibit greater performance degradation than those under negative drain bias stress. The greater performance degradation, the decreasing I ON and the larger V TH shift are due to the greater trap state density (N trap ) created in the bulk channel by the large lateral electrical field and the carriers injected into the gate insulator by the large vertical electrical field, respectively

  9. Did the expiration of retail price caps affect prices in the restructured Texas electricity market?

    International Nuclear Information System (INIS)

    Kang, Linhong; Zarnikau, Jay

    2009-01-01

    On January 1, 2007, the Electric Reliability Council of Texas (ERCOT) market became the first restructured market in the US to completely remove caps on the prices which could be charged to residential energy consumers by the retailers associated with the traditional or incumbent utility service providers. Our analysis suggests that the expiration of the price-to-beat (PTB) price caps may have led to a reduction in the average prices charged by competitive retail electric providers (REPs). (author)

  10. The reliability assessment of the electromagnetic valve of high-speed electric multiple units braking system based on two-parameter exponential distribution

    Directory of Open Access Journals (Sweden)

    Jianwei Yang

    2016-06-01

    Full Text Available In order to solve the reliability assessment of braking system component of high-speed electric multiple units, this article, based on two-parameter exponential distribution, provides the maximum likelihood estimation and Bayes estimation under a type-I life test. First of all, we evaluate the failure probability value according to the classical estimation method and then obtain the maximum likelihood estimation of parameters of two-parameter exponential distribution by performing and using the modified likelihood function. On the other hand, based on Bayesian theory, this article also selects the beta and gamma distributions as the prior distribution, combines with the modified maximum likelihood function, and innovatively applies a Markov chain Monte Carlo algorithm to parameters assessment based on Bayes estimation method for two-parameter exponential distribution, so that two reliability mathematical models of the electromagnetic valve are obtained. Finally, through type-I life test, the failure rates according to maximum likelihood estimation and Bayes estimation method based on Markov chain Monte Carlo algorithm are, respectively, 2.650 × 10−5 and 3.037 × 10−5. Compared with the failure rate of a electromagnetic valve 3.005 × 10−5, it proves that the Bayes method can use a Markov chain Monte Carlo algorithm to estimate reliability for two-parameter exponential distribution and Bayes estimation is more closer to the value of electromagnetic valve. So, by fully integrating multi-source, Bayes estimation method can preferably modify and precisely estimate the parameters, which can provide a certain theoretical basis for the safety operation of high-speed electric multiple units.

  11. Did Geomagnetic Activity Challenge Electric Power Reliability During Solar Cycle 23? Evidence from the PJM Regional Transmission Organization in North America

    Science.gov (United States)

    Forbes, Kevin F.; Cyr, Chris St

    2012-01-01

    During solar cycle 22, a very intense geomagnetic storm on 13 March 1989 contributed to the collapse of the Hydro-Quebec power system in Canada. This event clearly demonstrated that geomagnetic storms have the potential to lead to blackouts. This paper addresses whether geomagnetic activity challenged power system reliability during solar cycle 23. Operations by PJM Interconnection, LLC (hereafter PJM), a regional transmission organization in North America, are examined over the period 1 April 2002 through 30 April 2004. During this time PJM coordinated the movement of wholesale electricity in all or parts of Delaware, Maryland, New Jersey, Ohio, Pennsylvania, Virginia, West Virginia, and the District of Columbia in the United States. We examine the relationship between a proxy of geomagnetically induced currents (GICs) and a metric of challenged reliability. In this study, GICs are proxied using magnetometer data from a geomagnetic observatory located just outside the PJM control area. The metric of challenged reliability is the incidence of out-of-economic-merit order dispatching due to adverse reactive power conditions. The statistical methods employed make it possible to disentangle the effects of GICs on power system operations from purely terrestrial factors. The results of the analysis indicate that geomagnetic activity can significantly increase the likelihood that the system operator will dispatch generating units based on system stability considerations rather than economic merit.

  12. Price dynamics among U.S. electricity spot markets

    International Nuclear Information System (INIS)

    Park, Haesun; Mjelde, James W.; Bessler, David A.

    2006-01-01

    Combining recent advances in causal flows with time series analysis, relationships among 11 U.S. spot market electricity prices are examined. Results suggest that the relationships among the markets vary by time frame. In contemporaneous time, the western markets are separated from the eastern markets and the Electricity Reliability Council of Texas. At longer time frames these separations disappear, even though electricity transmission between the regions is limited. It appears the relationships among markets are not only a function of physical assets (such as transmissions lines among markets), but by similar and dissimilar institutional arrangements among the markets. (Author)

  13. Electric Power Monthly with data for July 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This publication provides monthly statistics at the state, census division, and U.S. levels for net generation; fossil fuel consumption and stocks, quantity, and quality of fossil fuels; cost of fossil fuels; electricity retail sales; associated revenue; and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council regions. Statistics on net generation are published by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The monthly update is summarized, and industry developments are briefly described. 57 tabs.

  14. Electric power monthly with data for June 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This publication provides monthly statistics at the state, census division, and U.S. levels for net generation; fossil fuel consumption and stocks, quantity, and quality of fossil fuels; cost of fossil fuels; electricity retail sales; associated revenue; and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity, and cost of fossil fuels are also displayed for the North American Electric Reliability Council regions. Statistics on net generation by energy source and capability of new generating units by company and plant are also included. A section is included in the report which summarizes major industry developments. 1 fig., 64 tabs.

  15. Effects of Nitrogen and Hydrogen Codoping on the Electrical Performance and Reliability of InGaZnO Thin-Film Transistors.

    Science.gov (United States)

    Abliz, Ablat; Gao, Qingguo; Wan, Da; Liu, Xingqiang; Xu, Lei; Liu, Chuansheng; Jiang, Changzhong; Li, Xuefei; Chen, Huipeng; Guo, Tailiang; Li, Jinchai; Liao, Lei

    2017-03-29

    Despite intensive research on improvement in electrical performances of ZnO-based thin-film transistors (TFTs), the instability issues have limited their applications for complementary electronics. Herein, we have investigated the effect of nitrogen and hydrogen (N/H) codoping on the electrical performance and reliability of amorphous InGaZnO (α-IGZO) TFTs. The performance and bias stress stability of α-IGZO device were simultaneously improved by N/H plasma treatment with a high field-effect mobility of 45.3 cm 2 /(V s) and small shifts of threshold voltage (V th ). On the basis of X-ray photoelectron spectroscopy analysis, the improved electrical performances of α-IGZO TFT should be attributed to the appropriate amount of N/H codoping, which could not only control the V th and carrier concentration efficiently, but also passivate the defects such as oxygen vacancy due to the formation of stable Zn-N and N-H bonds. Meanwhile, low-frequency noise analysis indicates that the average trap density near the α-IGZO/SiO 2 interface is reduced by the nitrogen and hydrogen plasma treatment. This method could provide a step toward the development of α-IGZO TFTs for potential applications in next-generation high-definition optoelectronic displays.

  16. ITER council proceedings: 2001

    International Nuclear Information System (INIS)

    2001-01-01

    Continuing the ITER EDA, two further ITER Council Meetings were held since the publication of ITER EDA documentation series no, 20, namely the ITER Council Meeting on 27-28 February 2001 in Toronto, and the ITER Council Meeting on 18-19 July in Vienna. That Meeting was the last one during the ITER EDA. This volume contains records of these Meetings, including: Records of decisions; List of attendees; ITER EDA status report; ITER EDA technical activities report; MAC report and advice; Final report of ITER EDA; and Press release

  17. Elections to Staff Council

    CERN Multimedia

    Saff Association

    2013-01-01

    2013 Elections to Staff Council   Vote! Make your voice heard and be many to elect the new Staff Council. More details on the elections can be found on the Staff Association web site (https://ap-vote.web.cern.ch/elections-2013).   Timetable elections Monday 28 October to Monday 11 November, 12:00 am voting Monday 18 and Monday 25 November, publication of the results in Echo Tuesday 19 November, Staff Association Assizes Tuesday 3 December, first meeting of the new Staff Council and election of the new Executive Committee The voting procedure is monitored by the Election Committee.

  18. Reliable fuzzy H∞ control for active suspension of in-wheel motor driven electric vehicles with dynamic damping

    Science.gov (United States)

    Shao, Xinxin; Naghdy, Fazel; Du, Haiping

    2017-03-01

    A fault-tolerant fuzzy H∞ control design approach for active suspension of in-wheel motor driven electric vehicles in the presence of sprung mass variation, actuator faults and control input constraints is proposed. The controller is designed based on the quarter-car active suspension model with a dynamic-damping-in-wheel-motor-driven-system, in which the suspended motor is operated as a dynamic absorber. The Takagi-Sugeno (T-S) fuzzy model is used to model this suspension with possible sprung mass variation. The parallel-distributed compensation (PDC) scheme is deployed to derive a fault-tolerant fuzzy controller for the T-S fuzzy suspension model. In order to reduce the motor wear caused by the dynamic force transmitted to the in-wheel motor, the dynamic force is taken as an additional controlled output besides the traditional optimization objectives such as sprung mass acceleration, suspension deflection and actuator saturation. The H∞ performance of the proposed controller is derived as linear matrix inequalities (LMIs) comprising three equality constraints which are solved efficiently by means of MATLAB LMI Toolbox. The proposed controller is applied to an electric vehicle suspension and its effectiveness is demonstrated through computer simulation.

  19. The impact of carbon taxes or allowances on the electric generation market in the Ohio and ECAR region

    International Nuclear Information System (INIS)

    Hadley, S.W.

    1998-07-01

    The North American electricity grid is separated into 11 regional reliability councils, collectively called the North American Electric Reliability Council (NERC). The East Central Area Reliability Coordination Agreement (ECAR) is the reliability council that covers Ohio and Indiana, along with parts of Kentucky, Illinois, Maryland, Michigan, Pennsylvania, Virginia, and West Virginia. Ohio and the rest of the ECAR region rely more heavily on coal-fired generation than any other US region. The purpose of this report is to study the effect of carbon reduction policies on the cost and price of generation in the ECAR region, with an emphasis on Ohio. In order to do that, the author modeled the possible electric generation system for the ECAR and Ohio region for the year 2010 using a model developed at Oak Ridge National Laboratory called the Oak Ridge Competitive Electric Dispatch model (ORCED). He let the model optimize the system based on various factors and carbon reduction policies to understand their impact. He then used the electricity prices and assumed demand elasticities to change the demands while also requiring all power plants to be profitable. The author discusses the different potential policies for carbon reduction and issues involving a restructured market; describes the model used for this analysis, the ECAR electricity sector, and the establishment of a base case; and describes the results of applying various carbon emission reduction approaches to the region. 14 figs., 5 tabs

  20. Reliability engineering

    International Nuclear Information System (INIS)

    Lee, Chi Woo; Kim, Sun Jin; Lee, Seung Woo; Jeong, Sang Yeong

    1993-08-01

    This book start what is reliability? such as origin of reliability problems, definition of reliability and reliability and use of reliability. It also deals with probability and calculation of reliability, reliability function and failure rate, probability distribution of reliability, assumption of MTBF, process of probability distribution, down time, maintainability and availability, break down maintenance and preventive maintenance design of reliability, design of reliability for prediction and statistics, reliability test, reliability data and design and management of reliability.

  1. Electric power monthly, August 1998, with data for May 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 9 refs., 57 tabs.

  2. Electric power monthly, March 1999 with data for December 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be sued in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 63 tabs.

  3. Electric power monthly, May 1998, with data for February 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974. The EPM provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 30 refs., 58 tabs.

  4. Electric power monthly, December 1997 with data for September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 63 tabs.

  5. Electric power monthly, May 1995 with data for February 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-24

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisiommakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuel, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  6. Electricity

    International Nuclear Information System (INIS)

    Tombs, F.

    1983-01-01

    The subject is discussed, with particular reference to the electricity industry in the United Kingdom, under the headings; importance and scope of the industry's work; future fuel supplies (estimated indigenous fossil fuels reserves); outlook for UK energy supplies; problems of future generating capacity and fuel mix (energy policy; construction programme; economics and pricing; contribution of nuclear power - thermal and fast reactors; problems of conversion of oil-burning to coal-burning plant). (U.K.)

  7. Medicare Appeals Council Decisions

    Data.gov (United States)

    U.S. Department of Health & Human Services — Decisions of the Departmental Appeals Board's Medicare Appeals Council involving claims for entitlement to Medicare and individual claims for Medicare coverage and...

  8. Allegheny County Council Districts

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset portrays the boundaries of the County Council Districts in Allegheny County. The dataset is based on municipal boundaries and City of Pittsburgh ward...

  9. ITER council proceedings: 1995

    International Nuclear Information System (INIS)

    1996-01-01

    Records of the 8. ITER Council Meeting (IC-8), held on 26-27 July 1995, in San Diego, USA, and the 9. ITER Council Meeting (IC-9) held on 12-13 December 1995, in Garching, Germany, are presented, giving essential information on the evolution of the ITER Engineering Design Activities (EDA) and the ITER Interim Design Report Package and Relevant Documents. Figs, tabs

  10. ITER council proceedings: 1998

    International Nuclear Information System (INIS)

    1999-01-01

    This volume contains documents of the 13th and the 14th ITER council meeting as well as of the 1st extraordinary ITER council meeting. Documents of the ITER meetings held in Vienna and Yokohama during 1998 are also included. The contents include an outline of the ITER objectives, the ITER parameters and design overview as well as operating scenarios and plasma performance. Furthermore, design features, safety and environmental characteristics are given

  11. News from Council

    CERN Multimedia

    2015-01-01

    Today concludes a very busy week for Council. As you’ll have seen from the press release this morning, Council elected a new President, who will take up his mandate on 1 January along with the new management team, which was also approved by Council yesterday.   You’ll find full details of the incoming Director-General’s management team and structures here. Completing the configuration for the immediate future, Council also approved the medium term plan, along with the budget for 2016. In other Council business, two complete applications for Associate Membership were discussed. Following an earlier letter, India’s complete application was received and considered by Council. Consequently, a fact-finding mission has been established to report back before the end of the year. A new application was also received from Azerbaijan, with a fact-finding mission to be established. India’s involvement with CERN goes back to the 1970s, and the country...

  12. Teflon/SiO2 Bilayer Passivation for Improving the Electrical Reliability of Oxide TFTs Fabricated Using a New Two-Photomask Self-Alignment Process

    Science.gov (United States)

    Fan, Ching-Lin; Shang, Ming-Chi; Li, Bo-Jyun; Lin, Yu-Zuo; Wang, Shea-Jue; Lee, Win-Der; Hung, Bohr-Ran

    2015-01-01

    This study proposes a two-photomask process for fabricating amorphous indium–gallium–zinc oxide (a-IGZO) thin-film transistors (TFTs) that exhibit a self-aligned structure. The fabricated TFTs, which lack etching-stop (ES) layers, have undamaged a-IGZO active layers that facilitate superior performance. In addition, we demonstrate a bilayer passivation method that uses a polytetrafluoroethylene (Teflon) and SiO2 combination layer for improving the electrical reliability of the fabricated TFTs. Teflon was deposited as a buffer layer through thermal evaporation. The Teflon layer exhibited favorable compatibility with the underlying IGZO channel layer and effectively protected the a-IGZO TFTs from plasma damage during SiO2 deposition, resulting in a negligible initial performance drop in the a-IGZO TFTs. Compared with passivation-free a-IGZO TFTs, passivated TFTs exhibited superior stability even after 168 h of aging under ambient air at 95% relative humidity. PMID:28788026

  13. Teflon/SiO₂ Bilayer Passivation for Improving the Electrical Reliability of Oxide TFTs Fabricated Using a New Two-Photomask Self-Alignment Process.

    Science.gov (United States)

    Fan, Ching-Lin; Shang, Ming-Chi; Li, Bo-Jyun; Lin, Yu-Zuo; Wang, Shea-Jue; Lee, Win-Der; Hung, Bohr-Ran

    2015-04-13

    This study proposes a two-photomask process for fabricating amorphous indium-gallium-zinc oxide (a-IGZO) thin-film transistors (TFTs) that exhibit a self-aligned structure. The fabricated TFTs, which lack etching-stop (ES) layers, have undamaged a-IGZO active layers that facilitate superior performance. In addition, we demonstrate a bilayer passivation method that uses a polytetrafluoroethylene (Teflon) and SiO₂ combination layer for improving the electrical reliability of the fabricated TFTs. Teflon was deposited as a buffer layer through thermal evaporation. The Teflon layer exhibited favorable compatibility with the underlying IGZO channel layer and effectively protected the a-IGZO TFTs from plasma damage during SiO₂ deposition, resulting in a negligible initial performance drop in the a-IGZO TFTs. Compared with passivation-free a-IGZO TFTs, passivated TFTs exhibited superior stability even after 168 h of aging under ambient air at 95% relative humidity.

  14. Teflon/SiO2 Bilayer Passivation for Improving the Electrical Reliability of Oxide TFTs Fabricated Using a New Two-Photomask Self-Alignment Process

    Directory of Open Access Journals (Sweden)

    Ching-Lin Fan

    2015-04-01

    Full Text Available This study proposes a two-photomask process for fabricating amorphous indium–gallium–zinc oxide (a-IGZO thin-film transistors (TFTs that exhibit a self-aligned structure. The fabricated TFTs, which lack etching-stop (ES layers, have undamaged a-IGZO active layers that facilitate superior performance. In addition, we demonstrate a bilayer passivation method that uses a polytetrafluoroethylene (Teflon and SiO2 combination layer for improving the electrical reliability of the fabricated TFTs. Teflon was deposited as a buffer layer through thermal evaporation. The Teflon layer exhibited favorable compatibility with the underlying IGZO channel layer and effectively protected the a-IGZO TFTs from plasma damage during SiO2 deposition, resulting in a negligible initial performance drop in the a-IGZO TFTs. Compared with passivation-free a-IGZO TFTs, passivated TFTs exhibited superior stability even after 168 h of aging under ambient air at 95% relative humidity.

  15. Effect of Heat and Electricity Storage and Reliability on Microgrid Viability: A Study of Commercial Buildings in California and New York States

    Energy Technology Data Exchange (ETDEWEB)

    Stadler, Michael; Marnay, Chris; Siddiqui, Afzal; Lai, Judy; Coffey, Brian; Aki, Hirohisa

    2009-03-10

    Berkeley Lab has for several years been developing methods for selection of optimal microgrid systems, especially for commercial building applications, and applying these methods in the Distributed Energy Resources Customer Adoption Model (DER-CAM). This project began with 3 major goals: (1) to conduct detailed analysis to find the optimal equipment combination for microgrids at a few promising commercial building hosts in the two favorable markets of California and New York, (2) to extend the analysis capability of DER-CAM to include both heat and electricity storage, and (3) to make an initial effort towards adding consideration of power quality and reliability (PQR) to the capabilities of DER-CAM. All of these objectives have been pursued via analysis of the attractiveness of a Consortium for Electric Reliability Technology Solutions (CERTS) Microgrid consisting of multiple nameplate 100 kW Tecogen Premium Power Modules (CM-100). This unit consists of an asynchronous inverter-based variable speed internal combustion engine genset with combined heat and power (CHP) and power surge capability. The essence of CERTS Microgrid technology is that smarts added to the on-board power electronics of any microgrid device enables stable and safe islanded operation without the need for complex fast supervisory controls. This approach allows plug and play development of a microgrid that can potentially provide high PQR with a minimum of specialized site-specific engineering. A notable feature of the CM-100 is its time-limited surge rating of 125 kW, and DER-CAM capability to model this feature was also a necessary model enhancement.

  16. A report from Council

    CERN Multimedia

    2014-01-01

    The June meeting of Council is always a very busy one, having approval of the next year’s budget and the MTP as fixed agenda points. This year in addition, we had discussions on enlargement, as well as on the pension fund. I’d like to use this message to bring you up to date on all of those matters.   I’ll begin with the good news that the 2015 budget and MTP were recommended for approval by Finance Committee on Wednesday, and approved by Council on Thursday. This is extremely good news, and a solid vote of confidence from Council in the current economic situation. Coupled with that, I am pleased to report that at the half way stage of 2014, some 89% of budget contributions for the year have been received. Turning now to enlargement, I can inform you that the task force that went to Pakistan came back with a positive report, and as a consequence Council has authorised us to finalise discussion with Pakistan for Associate Membership. Council also authoris...

  17. 2017 NREL Photovoltaic Reliability Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-08-15

    NREL's Photovoltaic (PV) Reliability Workshop (PVRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology -- both critical goals for moving PV technologies deeper into the electricity marketplace.

  18. Small nuclear power reactor emergency electric power supply system reliability comparative analysis; Analise da confiabilidade do sistema de suprimento de energia eletrica de emergencia de um reator nuclear de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Bonfietti, Gerson

    2003-07-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  19. Electric Power Monthly, July 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-12

    The Electric Power Monthly (EPM) is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost in fuel. Quantity, quality, and cost of fuel data lag the net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour data by 1 month. This difference in reporting appears in the national, Census division, and State level tables. However, at the plant level, all statistics presented are for the earlier month for the purpose of comparison. 12 refs., 4 figs., 48 tabs.

  20. Electric power monthly, January 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels

  1. Electric power monthly, February 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    The Electric Power Monthly (EMP) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  2. Electric power monthly, January 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-26

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  3. Electric power monthly, October 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-20

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  4. Electric power monthly, July 1999, with data for April 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The Electric Power Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the Electric Power Monthly (EPM). This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatt hour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 1 fig., 64 tabs.

  5. Electric power monthly, December 1996 with data for September 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The report presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatt hour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 57 tabs.

  6. ITER Council proceedings: 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Records of the third ITER Council Meeting (IC-3), held on 21-22 April 1993, in Tokyo, Japan, and the fourth ITER Council Meeting (IC-4) held on 29 September - 1 October 1993 in San Diego, USA, are presented, giving essential information on the evolution of the ITER Engineering Design Activities (EDA), such as the text of the draft of Protocol 2 further elaborated in ''ITER EDA Agreement and Protocol 2'' (ITER EDA Documentation Series No. 5), recommendations on future work programmes: a description of technology R and D tasks; the establishment of a trust fund for the ITER EDA activities; arrangements for Visiting Home Team Personnel; the general framework for the involvement of other countries in the ITER EDA; conditions for the involvement of Canada in the Euratom Contribution to the ITER EDA; and other attachments as parts of the Records of Decision of the aforementioned ITER Council Meetings

  7. ITER council proceedings: 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Records of the third ITER Council Meeting (IC-3), held on 21-22 April 1993, in Tokyo, Japan, and the fourth ITER Council Meeting (IC-4) held on 29 September - 1 October 1993 in San Diego, USA, are presented, giving essential information on the evolution of the ITER Engineering Design Activities (EDA), such as the text of the draft of Protocol 2 further elaborated in ``ITER EDA Agreement and Protocol 2`` (ITER EDA Documentation Series No. 5), recommendations on future work programmes: a description of technology R and D tastes; the establishment of a trust fund for the ITER EDA activities; arrangements for Visiting Home Team Personnel; the general framework for the involvement of other countries in the ITER EDA; conditions for the involvement of Canada in the Euratom Contribution to the ITER EDA; and other attachments as parts of the Records of Decision of the aforementioned ITER Council Meetings.

  8. ITER council proceedings: 1997

    International Nuclear Information System (INIS)

    1997-01-01

    This volume of the ITER EDA Documentation Series presents records of the 12th ITER Council Meeting, IC-12, which took place on 23-24 July, 1997 in Tampere, Finland. The Council received from the Parties (EU, Japan, Russia, US) positive responses on the Detailed Design Report. The Parties stated their willingness to contribute to fulfil their obligations in contributing to the ITER EDA. The summary discussions among the Parties led to the consensus that in July 1998 the ITER activities should proceed for additional three years with a general intent to enable an efficient start of possible, future ITER construction

  9. Statewide Suicide Prevention Council

    Science.gov (United States)

    State Employees Statewide Suicide Prevention Council DHSS State of Alaska Home Divisions and Agencies National Suicide Prevention Lifeline Alaska Community Mental Health Centers National Survivors of Suicide Meetings Presentations 2010 Alaska Statewide Suicide Prevention Summit: Mending the Net Connect with us on

  10. International fusion research council

    International Nuclear Information System (INIS)

    Belozerov, A.N.

    1977-01-01

    A brief history of the International Fusion Research Council (IFRC) is given and the minutes of the 1976 meeting in Garching are summarized. At the Garching meeting, the IFRC evaluated the quality of papers presented at recent IAEA conferences on plasma physics and controlled thermonuclear research, and made recommendations on the organization and timing of future meetings on nuclear fusion

  11. Elections to Staff Council

    CERN Multimedia

    Staff Association

    2011-01-01

    Elections to fill all seats in the Staff Council are being organized this month. The voting takes place from the 31st of October to the 14th of November, at noon. As you may have noted when reading Echo, many issues concerning our employment conditions are on the agenda of the coming months and will keep the next Staff Council very busy. So, make your voice heard and take part in the elections for a new Staff Council. By doing so, you will be encouraging the men and women who will be representing you over the next two years and they will doubtless appreciate your gratitude. Every member of the Staff Association will have received an email containing a link to the webpage which will allow voting. If you are a member of the Staff Association and you did not receive such an email, please contact the Staff Association secretariat (staff.association@cern.ch). Do not forget to vote * * * * * * * Vote Make your voice heard and be many to elect the new Staff Council. More details on the election...

  12. Council Membership Directory 1969.

    Science.gov (United States)

    Council of Organizations Serving the Deaf, Washington, DC.

    Information is provided on the purposes, goals, functions, membership, board of directors, calendar of events, publications, and names and addresses of the officers or executive committees of 19 national organizations serving the deaf. Organizations included are the Council of Organizations Serving the Deaf, Alexander Graham Bell Association for…

  13. Councils of Urgent Studies

    Science.gov (United States)

    Cellarius, Richard A.; Platt, John

    1972-01-01

    Discusses the role of national or international coordinating councils in focusing research on solutions of major human problems. Presents a taxonomy of 25 areas under the major heading: Physical Technology and Engineering; Biotechnology; Behavior and Personal Relations; National Social Structures; World Structure; and Channels of Effectiveness.…

  14. Report from Council

    CERN Document Server

    2015-01-01

    This week’s Council meeting was dominated by discussions about the long-term, sustainable future of CERN. Key points are progress on the Medium-Term Plan, the successful LHC restart, and enlargement.   The budget proposed by management for 2016 was well received, as were the measures to mitigate against the recent change in exchange rates. These items will be put to the vote in September. Discussions on CERN staff employment conditions were conducted in a constructive atmosphere this week, and will continue in future Council meetings. The Council also clearly voiced its congratulations for the smooth and successful start of LHC run 2, coming on top of a clear run of spectacular scientific and technological successes over recent years. In the current climate of austerity, these developments are a strong endorsement from the Council. Nevertheless, it would be disingenuous of me to pretend that everything is rosy. There has been an air of unease at CERN over recent months, which was v...

  15. 77 FR 2275 - Manufacturing Council

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF COMMERCE International Trade Administration Manufacturing Council AGENCY... candidate's proven experience in promoting, developing and marketing programs in support of manufacturing... participating in Council meetings and events are responsible for their travel, living and other personal...

  16. 76 FR 33244 - Manufacturing Council

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF COMMERCE International Trade Administration Manufacturing Council AGENCY... experience in promoting, developing and marketing programs in support of manufacturing industries, in job... Council meetings and events are responsible for their travel, living and other personal expenses. Meetings...

  17. Science councils in South Africa

    CSIR Research Space (South Africa)

    Scholes, RJ

    2008-11-01

    Full Text Available for Scien- tific and Industrial Research (CSIR), the Medical Research Council, Agricultural Research Council, Human Sciences Research Council, Council for Geosciences, Mintek, and the Nuclear Energy Corporation of SA. Legally, it includes the National... with social or commercial impact is long and uncer- tain, and becomes more and more expen- sive the closer the development gets to implementation. It is hard for a single organization to span this entire contin- uum effectively—it requires ‘interfacial...

  18. Electric Power Monthly, June 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-13

    The EPM is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. Quantity, quality, and cost of fuel data lag the net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour data by 1 month. This difference in reporting appears in the national, Census division, and State level tables. However, at the plant level, all statistics presented are for the earlier month for the purpose of comparison. 40 tabs.

  19. Reliability analysis with the simulator S.ESCAF of a very complex sequential system: the electrical power supply system of a nuclear reactor

    International Nuclear Information System (INIS)

    Blot, M.

    1987-06-01

    The reliability analysis of complex sequential systems, in which the order of arrival of the events must be taken into account, can be very difficult, because the use of the classical modelling technique of Markov diagrams leads to an important limitation on the number of components which can be handled. The desk-top apparatus S.ESCAF, which electronically simulates very closely the behaviour of the system being studied, and is very easy to use, even by a non specialist in electronics, allows one to avoid these inconveniences and to enlarge considerably the analysis possibilities. This paper shows the application of the S.ESCAF method to the electrical power supply system of a nuclear reactor. This system requires the simulation of more than forty components with about sixty events such as failure, repair and refusal to start. A comparison of times necessary to perform the analysis by these means and by other methods is described, and the advantages of S.ESCAF are presented

  20. Power electronics reliability analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Mark A.; Atcitty, Stanley

    2009-12-01

    This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

  1. Cyber security for greater service reliability

    Energy Technology Data Exchange (ETDEWEB)

    Vickery, P. [N-Dimension Solutions Inc., Richmond Hill, ON (Canada)

    2008-05-15

    Service reliability in the electricity transmission and distribution (T and D) industry is being challenged by increased equipment failures, harsher climatic conditions, and computer hackers who aim to disrupt services by gaining access to transmission and distribution resources. This article discussed methods of ensuring the cyber-security of T and D operators. Weak points in the T and D industry include remote terminal units; intelligent electronic devices; distributed control systems; programmable logic controllers; and various intelligent field devices. An increasing number of interconnection points exist between an operator's service control system and external systems. The North American Electric Reliability Council (NERC) standards specify that cyber security strategies should ensure that all cyber assets are protected, and that access points must be monitored to detect intrusion attempts. The introduction of new advanced metering initiatives must also be considered. Comprehensive monitoring systems should be available to support compliance with cyber security standards. It was concluded that senior management should commit to a periodic cyber security re-assessment program in order to keep up-to-date.

  2. Reliability Engineering

    International Nuclear Information System (INIS)

    Lee, Sang Yong

    1992-07-01

    This book is about reliability engineering, which describes definition and importance of reliability, development of reliability engineering, failure rate and failure probability density function about types of it, CFR and index distribution, IFR and normal distribution and Weibull distribution, maintainability and movability, reliability test and reliability assumption in index distribution type, normal distribution type and Weibull distribution type, reliability sampling test, reliability of system, design of reliability and functionality failure analysis by FTA.

  3. Power transformer reliability modelling

    NARCIS (Netherlands)

    Schijndel, van A.

    2010-01-01

    Problem description Electrical power grids serve to transport and distribute electrical power with high reliability and availability at acceptable costs and risks. These grids play a crucial though preferably invisible role in supplying sufficient power in a convenient form. Today’s society has

  4. Electric power monthly, June 1995 with data for March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-19

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 68 tabs.

  5. Electric power monthly with data for December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  6. Electric power monthly with data for January 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  7. Electric power monthly, September 1996, with data for June 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatt hour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  8. Electric power monthly with data for October 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  9. UN human rights council

    Directory of Open Access Journals (Sweden)

    Vuksanović Mlrjana

    2014-01-01

    Full Text Available The paper deals with the structure, mechanisms, practices and perspectives of the Human Rights Council, the UN body that, at universal level is the most important body in this area. Introductory section provides for a brief overview of the origins of human rights and the work of the Commission on Human Rights, in whose jurisdiction were questions of human rights before the establishment of the Council. After the introductory section the author gives an analysis of the structure, objectives, mandate and main procedures for the protection of human rights within the united Nations. In the final section the authorpoints out the advantages of this authority and criticism addressed to it, with emphasis on the possibility and the need for its reform.

  10. RTE - 2013 Reliability Report

    International Nuclear Information System (INIS)

    Denis, Anne-Marie

    2014-01-01

    RTE publishes a yearly reliability report based on a standard model to facilitate comparisons and highlight long-term trends. The 2013 report is not only stating the facts of the Significant System Events (ESS), but it moreover underlines the main elements dealing with the reliability of the electrical power system. It highlights the various elements which contribute to present and future reliability and provides an overview of the interaction between the various stakeholders of the Electrical Power System on the scale of the European Interconnected Network. (author)

  11. Highlights: Spring Council Meeting

    Science.gov (United States)

    Council members present at the May 24, 1981, meeting were Keiiti Aki, Steven Burges (for Jim Wallis), Peter S. Eagleson, E. R. Engdahl, Charles E. Helsley, James R. Heirtzler, Carl Kisslinger, Leslie H. Meredith, Chris N. K. Mooers, Norman F. Ness, Marcia M. Neugebauer, James J. O'Brien, Richard Rapp, Carl Sagan, James C. Savage, Joseph V. Smith, Fred Spilhaus, Donald L. Turcotte, James A. Van Allen, J. Tuzo Wilson, and Jay Winston (for Elmar R. Reiter until his arrival at 6:50 P.M.). David Strangway, representing the Canadian Geophysical Union, and Peter Steinhauser, representing the European Geophysical Society, were special observers at the meeting. Council meetings are open, and a number of section secretaries, committee chairmen, journal editors, and other members attended. The following major actions were adopted by the Council:The experiment of publishing oceanography and lower-atmosphere papers in JGR Green issues alternate to those containing upper-atmosphere papers will be continued through 1982. From preliminary indications the experiment seems to be working, but a full year of data, including a renewal cycle, is needed to assess the success of the experiment. Final decision will be made prior to the 1983 dues notices.

  12. DECLARATION TO COUNCIL

    CERN Multimedia

    Staff Association

    2015-01-01

    One year ago, the Staff Association, together with the CERN-ESO Pensioners' Association, organized a staff meeting in front of this building to express our concern about certain actions of this Committee. Today we deem it necessary to come before you and convey in person, dear delegates, the concerns and worries of the staff. Indeed, the last 18 months we have observed a tendency of Council to take matters, in particular in the field of pensions, into its own hands, bypassing established governance structures, which Council has itself put into place. As a result, the Director General was prevented from playing his essential role of intermediary between staff and Council, an essential element of the established social dialogue. The creation of CERN in 1954 was very much based on the willingness of many countries of the old Continent to share resources to create a joint fundamental physics laboratory. The emphasis was on sharing resources for the common good to allow European scientists to engage in...

  13. Council Chamber exhibition

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    To complete the revamp of CERN’s Council Chamber, a new exhibition is being installed just in time for the June Council meetings.   Panels will showcase highlights of CERN’s history, using some of the content prepared for the exhibitions marking 50 years of the PS, which were displayed in the main building last November. The previous photo exhibition in the Council Chamber stopped at the 1970s. To avoid the new panels becoming quickly out of date, photos are grouped together around specific infrastructures, rather than following a classic time-line. “We have put the focus on the accelerators – the world-class facilities that CERN has been offering researchers over the years, from the well-known large colliders to the lesser-known smaller facilities,” says Emma Sanders, who worked on the content. The new exhibition will be featured in a future issue of the Bulletin with photos and an interview with Fabienne Marcastel, designer of the exhibit...

  14. Elections to Staff Council

    CERN Multimedia

    Staff Association

    2013-01-01

    Elections to fill all seats in the Staff Council are being organized this month. The voting takes place from the 28 of October to the 11th of November, at noon. As you may have noted when reading Echo, many issues concerning our employment conditions are on the agenda of the coming months, and in particular the Five-yearly-Review 2015, subject of the questionnaire that you probably recently filled out. All this will keep the next Staff Council very busy indeed. So, make your voice heard and take part in the elections for a new Staff Council. By doing so, you will be encouraging the men and women who will be representing you over the next two years and they will doubtless appreciate your gratitude. Every member of the Staff Association will have received an email containing a link to the webpage which will allow voting. If you are a member of the Staff Association and you did not receive such an email, please contact the Staff Association secretariat (staff.association@cern.ch). Do not forget to v...

  15. 18 CFR 39.5 - Reliability Standards.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reliability Standards... RELIABILITY STANDARDS § 39.5 Reliability Standards. (a) The Electric Reliability Organization shall file each Reliability Standard or modification to a Reliability Standard that it proposes to be made effective under...

  16. Reliability optimization in compound electric power systems with the aid of evolutionary algorithms; Optimizacion de la confiabilidad en sistemas electricos de potencia compuestos utilizando algoritmos evolucionarios

    Energy Technology Data Exchange (ETDEWEB)

    Gomez Hernandez, Jose Alberto

    2001-11-15

    The purpose of evaluating the reliability of Electric Power Systems is to estimate the ability of the system to carry out their function of taking the energy from the generating stations to the load points. This involves the reliability of generation sources and transmission that affect in the transfer of power through the transmission system that bears load loss and voltage sags between the generation and the consumption centers. In this thesis a hybrid methodology that optimize the reliability in systems generation -transmission using evolutionary algorithms is developed. This technique of optimization determines the optimum number of components (parallel redundancy in lines) and shunt compensation in load nodes necessary to maximize reliability, subject to cost restrictions, and considering security conditions in steady state, using the smallest singular value technique. The objective function will be defined as stochastic function, where the measure of interests is the smallest singular value of the Jacobian matrix of power flows solution of the most severe event according to the evaluation of reliability of the generation transmission system, this formulation is a combination of integer and continuous non linear programming, where the conventional mathematical programming algorithms present difficulties in robustness and global optimal search. The fault in generation units is determined by using the state sampling together with the transmission system by Monte Carlo simulation for a desired load level. For events where violations in security exist (lines loading, violation in voltage in load nodes and violation in reactive power of generation nodes) a model of active and reactive power dispatch is used in order to correct these violations by means of the exact penalty function linear programming technique to proceeded to determine the stability of voltage in steady state by means of the smallest singular value technique and the participation factors of nodes

  17. Power Electronics Packaging Reliability | Transportation Research | NREL

    Science.gov (United States)

    Packaging Reliability Power Electronics Packaging Reliability A photo of a piece of power electronics laboratory equipment. NREL power electronics packaging reliability research investigates the electronics packaging around a semiconductor switching device determines the electrical, thermal, and

  18. 78 FR 38311 - Reliability Technical Conference Agenda

    Science.gov (United States)

    2013-06-26

    ... issues related to the reliability of the Bulk-Power System. The agenda for this conference is attached... Reliability Technical Docket No. AD13-6-000 Conference. North American Electric Docket No. RC11-6-004 Reliability Corporation. North American Electric Docket No. RR13-2-000 Reliability Corporation. Not...

  19. Electric power monthly, July 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels. Data on quantity, quality, and cost of fossil fuels lag data on net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour by 1 month. This difference in reporting appears in the US, Census division, and State level tables. However, for purposes of comparison, plant-level data are presented for the earlier month.

  20. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  1. Public health council

    International Nuclear Information System (INIS)

    1979-01-01

    The internal matters of the council are reported followed by reports from the individual committees. These include committees of radiation hygiene, food irradiation, the disposal of radioactive waste and the classification of isotope laboratories, guide-lines for radiation protection in hospitals and clinics, isotope laboratories, legal liability for radiation accidents, nuclear heart stimulators, computer tomography, supplementary advice about nuclear energy, combustion furnace for radioactive waste, and experiments with radioactive materials on testees. Each report describes the setting up of the committee, the members, its function with a short description of the work completed in 1977. (Auth.)

  2. Recent developments in the U.S. and their relevance to Ontario's electricity sector

    International Nuclear Information System (INIS)

    Shalaby, A.

    2005-01-01

    Canada supplies nearly 100 per cent of U.S. electricity imports. By 2025, U.S. energy demand is expected to rise by 30 per cent. This PowerPoint presentation examined the relevance of recent developments in the United States to Ontario's electricity sector. A chart of U.S.-Canada energy trade from 1990 to 2002 was presented. It was noted that the Federal Energy Regulatory Commission (FERC) has increased its emphasis on reliability in response to recommendations by the U.S.-Canada Power System Outage Task Force Report. The creation of the Electric Reliability Organization (ERO) was discussed. An outline of the current reliability framework was presented, along with a map of National Electric Reliability Council (NERC) regions. Issues concerning mandatory compliance with reliability standards were examined with reference to various provinces in Canada. It was noted that achieving mandatory and enforceable standards in the U.S. has been a high priority for Canadian entities. An overview of U.S. legislation relating to reliability standards was presented. An outline of current and proposed regional transmission organizations (RTOs) in North America was presented, along with outlines of their reliability and planning protocols. A map of current transmission lines was presented. The implications of independent system operator (ISO) and RTO developments for Ontario were reviewed. Issues concerning emissions reductions and renewable energy credits trading were discussed. It was concluded that reliability legislation will be a positive development for Ontario, Canada, and U.S. jurisdictions. tabs., figs

  3. Selection, design, qualification, testing, and reliability of emergency diesel generator units used as Class 1E onsite electric power systems at nuclear power plants

    International Nuclear Information System (INIS)

    1992-04-01

    This guide has been prepared for the resolution of Generic Safety Issue B-56, ''Diesel Generator Reliability,'' and is related to Unresolved Safety Issue (USI) A-44, ''Station Blackout.'' The resolution of USI A-44 established a need for an emergency diesel generator (EDG) reliability program that has the capability to achieve and maintain the emergency diesel generator reliability levels in the range of 0.95 per demand or better to cope with station blackout

  4. News from Council

    CERN Multimedia

    2016-01-01

    With this message I would like to share with you some highlights of this week’s Council meetings.   A major topic was the approval of CERN’s Medium Term Plan (MTP) 2017-2021, along with the budget for 2017. In approving the document, Council expressed its very strong support for the research programme the MTP outlines for the coming years.  Another important topic this week was the formal approval of the High Luminosity LHC project, HL-LHC. This comes as extremely good news not only for CERN, but also for particle physics globally. HL-LHC is the top priority of the European Strategy for Particle Physics in its 2013 update, and is part of the 2016 roadmap of the European Strategy Forum on Research Infrastructures, ESFRI. It was also identified as a priority in the US P5 strategy process, and in Japan’s strategic vision for the field. It secures CERN’s future until 2035, and ensures that we will achieve the maximum scientific return on the investment...

  5. Strengthening Africa's science granting councils as champions of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Science granting councils are central to funding and catalyzing research and innovation, particularly in national science systems in sub-Saharan Africa. The availability of reliable indicators—to monitor Africa's scientific and technological developments, implement science policies and strategies, track public investment in ...

  6. Electric power monthly, June 1998, with data for March 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and Us levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 5 refs., 57 tabs.

  7. IEEE guide to the collection and presentation of electrical, electronic, and sensing component reliability data for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    Guidelines are given for the purpose of establishing standardization methods for collecting and presenting reliability data for quantitative systematic analysis in nuclear power plants. This guide may be also used for reliability analysis in other segments of power industry. The data considered include failure rates, failure modes and environmental impact on component behavior

  8. 40 CFR 1508.6 - Council.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Council. 1508.6 Section 1508.6 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY TERMINOLOGY AND INDEX § 1508.6 Council. Council means the Council on Environmental Quality established by title II of the Act. ...

  9. ITER council proceedings: 2000

    International Nuclear Information System (INIS)

    2001-01-01

    No ITER Council Meetings were held during 2000. However, two ITER EDA Meetings were held, one in Tokyo, January 19-20, and one in Moscow, June 29-30. The parties participating in these meetings were those that partake in the extended ITER EDA, namely the EU, the Russian Federation, and Japan. This document contains, a/o, the records of these meetings, the list of attendees, the agenda, the ITER EDA Status Reports issued during these meetings, the TAC (Technical Advisory Committee) reports and recommendations, the MAC Reports and Advice (also for the July 1999 Meeting), the ITER-FEAT Outline Design Report, the TAC Reports and Recommendations both meetings), Site requirements and Site Design Assumptions, the Tentative Sequence of technical Activities 2000-2001, Report of the ITER SWG-P2 on Joint Implementation of ITER, EU/ITER Canada Proposal for New ITER Identification

  10. Trump revives National Space Council

    Science.gov (United States)

    Johnston, Hamish

    2017-08-01

    US president Donald Trump has signed an executive order to re-establish the US National Space Council. The 12-member council will include key government officials with an interest in space exploration, including NASA’s acting administrator Robert Lightfoot and the secretaries of state, commerce and defence.

  11. Reliability data book

    International Nuclear Information System (INIS)

    Bento, J.P.; Boerje, S.; Ericsson, G.; Hasler, A.; Lyden, C.O.; Wallin, L.; Poern, K.; Aakerlund, O.

    1985-01-01

    The main objective for the report is to improve failure data for reliability calculations as parts of safety analyses for Swedish nuclear power plants. The work is based primarily on evaluations of failure reports as well as information provided by the operation and maintenance staff of each plant. In the report are presented charts of reliability data for: pumps, valves, control rods/rod drives, electrical components, and instruments. (L.E.)

  12. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  13. Recent developments in the U.S. and their relevance to Ontario's electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Shalaby, A. [Independent Electricity System Operator, Toronto, ON (Canada)

    2005-07-01

    Canada supplies nearly 100 per cent of U.S. electricity imports. By 2025, U.S. energy demand is expected to rise by 30 per cent. This PowerPoint presentation examined the relevance of recent developments in the United States to Ontario's electricity sector. A chart of U.S.-Canada energy trade from 1990 to 2002 was presented. It was noted that the Federal Energy Regulatory Commission (FERC) has increased its emphasis on reliability in response to recommendations by the U.S.-Canada Power System Outage Task Force Report. The creation of the Electric Reliability Organization (ERO) was discussed. An outline of the current reliability framework was presented, along with a map of National Electric Reliability Council (NERC) regions. Issues concerning mandatory compliance with reliability standards were examined with reference to various provinces in Canada. It was noted that achieving mandatory and enforceable standards in the U.S. has been a high priority for Canadian entities. An overview of U.S. legislation relating to reliability standards was presented. An outline of current and proposed regional transmission organizations (RTOs) in North America was presented, along with outlines of their reliability and planning protocols. A map of current transmission lines was presented. The implications of independent system operator (ISO) and RTO developments for Ontario were reviewed. Issues concerning emissions reductions and renewable energy credits trading were discussed. It was concluded that reliability legislation will be a positive development for Ontario, Canada, and U.S. jurisdictions. tabs., figs.

  14. Increasing the reliability of electricity supply of industrial enterprises for the account of application of a quick-running redundant power supply

    Directory of Open Access Journals (Sweden)

    Vertugin A.A.

    2017-06-01

    Full Text Available One of the main tasks to be performed when organizing the operation of the energy system is to ensure high-quality and uninterrupted power supply to consumers. Dips, interruptions and voltage surges of the electrical network are the most common causes of malfunctions in industrial plants and damage to household equipment, causing significant economic damage to both consumers and electricity suppliers.

  15. 2015 NREL Photovoltaic Module Reliability Workshops

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-14

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  16. 2016 NREL Photovoltaic Module Reliability Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-07

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology - both critical goals for moving PV technologies deeper into the electricity marketplace.

  17. Evolución de los métodos de evaluación de la confiabilidad para redes eléctricas de distribución; Evolution of reliability assessment methods for electrical distribution networks

    Directory of Open Access Journals (Sweden)

    Eduardo Sierra Gil

    2011-05-01

    Full Text Available Este trabajo pretende ofrecer una breve panorámica sobre la evolución de los métodos de evaluación de la confiabilidad y las especificidades de los mismos durante la caracterización de redes eléctricas de distribución y mostrar como la utilización de uno u otro depende no solo de de la disponibilidad de datos y la existencia o no de regulaciones para la continuidad del servicio eléctrico, sino que además depende del enfoque que se le de al estudio en cuestión, selección de variantes durante el diseño, opciones de mejora de la confiabilidad durante la explotación o gestión de mantenimiento.  This paper intends to offer a brief panoramic about the evolution of the reliability assessment methods and the specificities of the same ones during the characterization of the electrical distribution networks and to show how the utilization of either method not depends only of availability of data and the existence or not of regulations for the continuity of electrical service, rather besides depends of the approach to reliability studies in point: selection of variants during the design, reliability improving options during the exploitations or maintenance management.

  18. News from the CERN Council

    CERN Multimedia

    The CERN Council today thanked the Organization’s outgoing management, and welcomed in the new. Outgoing Director General Robert Aymar, looked back on his five years at the helm, while new Director General, Rolf Heuer, presented his vision for the future. In other Council business, Romania was welcomed as a Candidate for Accession as Member State of CERN; and the groundwork was laid for a study of geographical and scientific extension of the role of CERN. Council also established the practical procedures for following projects relevant to the European Strategy for Particle Physics. Consult the complete Press Release.

  19. RTE - 2015 Reliability Report. Summary

    International Nuclear Information System (INIS)

    2016-01-01

    Every year, RTE produces a reliability report for the past year. This report includes a number of results from previous years so that year-to-year comparisons can be drawn and long-term trends analysed. The 2015 report underlines the major factors that have impacted on the reliability of the electrical power system, without focusing exclusively on Significant System Events (ESS). It describes various factors which contribute to present and future reliability and the numerous actions implemented by RTE to ensure reliability today and in the future, as well as the ways in which the various parties involved in the electrical power system interact across the whole European interconnected network

  20. I have a dream... for electricity production in France. Wind and photovoltaic: history of an evil scam. Climate and energy: the French-German Council of Ministers said... (on the 19 February 2014 at the Elysee Palace)

    International Nuclear Information System (INIS)

    Gay, Michel

    2014-03-01

    In a first article, the author expresses a dream in which France could produce energy with nuclear and hydraulic energy while putting aside wind turbines and photovoltaic panels which he considers as wrongly seducing chimeras. He also supports the project of construction of two EPRs per year during 30 years (from 2017 to 2047), and relies on the development of new fast breeder reactors. In a second article, he denounces the promotion of renewable energies which is, according to him, a scam. He notably refers to actual costs and supposed job creations. The third article comments and criticizes the content of the statement made by the French-German Council of Ministers on the Climate-Energy issue with the aim of a better coordination of energy transition processes. He more particularly discusses issues related to public policies, to industrial and technological cooperation

  1. 75 FR 71625 - System Restoration Reliability Standards

    Science.gov (United States)

    2010-11-24

    ... to start operating and delivering electric power without assistance from the electric system... and system restoration and reporting following disturbances. \\3\\ North American Electric Reliability... Reliability Standards for the Bulk-Power System and determined that the proposed requirements are necessary to...

  2. Coordinated emergency response in a competitive electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Brindley, S. [Independent Electricity Market Operator, Toronto, ON (Canada)

    2002-07-01

    The Ontario Electricity Act and the Market Rules oblige electricity market participants to prepare and submit emergency plans to ensure the safe and reliable operation of the power system. Security and emergency preparedness includes emergency planning, drills and exercises, and critical infrastructure protection. The risk of power disruption is credible and the impact is large, as witnessed by the 1998 ice storm in eastern Ontario which resulted in major power outages, and as witnessed by the events of September 11, 2001. The emergency control actions that manage power system contingencies include recalling planned outages, reducing interchanges, increasing reserves, reducing voltage, purchasing emergency energy, and load shedding. Restoration priorities are to first restore power to critical transmission and generating station service loads, then to restore critical telecom facilities. This is followed by the restoration of customer loads only to the extent needed to control voltage and secure generating units. The final priority is to interconnect neighbours. The North American Electric Reliability Council (NERC) was established following the major 1965 blackout. NERC developed operational reliability standards and monitored compliance. A map depicting NERC regions and control areas in the US was presented. In Canada, the Canadian Electricity Association (CEA) addresses issues regarding critical infrastructure protection (CIP). It safeguards the essential components of the electricity infrastructure against physical and cyber threats through early warning systems and information sharing. 9 figs.

  3. Software reliability

    CERN Document Server

    Bendell, A

    1986-01-01

    Software Reliability reviews some fundamental issues of software reliability as well as the techniques, models, and metrics used to predict the reliability of software. Topics covered include fault avoidance, fault removal, and fault tolerance, along with statistical methods for the objective assessment of predictive accuracy. Development cost models and life-cycle cost models are also discussed. This book is divided into eight sections and begins with a chapter on adaptive modeling used to predict software reliability, followed by a discussion on failure rate in software reliability growth mo

  4. Electric power monthly, October 1998, with data for July 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 57 tabs.

  5. Electric power monthly, November 1998, with data for August 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 57 tabs.

  6. Electric power monthly, September 1998, with data for June 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  7. Electric power monthly, June 1999, with data for March 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 57 tabs.

  8. Electric power monthly, April 1999 with data for January 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  9. Electric power monthly: October 1995, with data for July 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-19

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  10. Hewitt launches Research Councils UK

    CERN Multimedia

    2002-01-01

    "Trade and Industry Secretary Patricia Hewitt today launched 'Research Councils UK' - a new strategic partnership that will champion research in science, engineering and technology across the UK" (1 page).

  11. 75 FR 12507 - Manufacturing Council

    Science.gov (United States)

    2010-03-16

    ... in the selection of Council members include candidates' proven experience in developing and marketing... contact information such as mailing address, fax, e-mail, fixed and mobile phone numbers and support staff...

  12. Multidisciplinary System Reliability Analysis

    Science.gov (United States)

    Mahadevan, Sankaran; Han, Song; Chamis, Christos C. (Technical Monitor)

    2001-01-01

    The objective of this study is to develop a new methodology for estimating the reliability of engineering systems that encompass multiple disciplines. The methodology is formulated in the context of the NESSUS probabilistic structural analysis code, developed under the leadership of NASA Glenn Research Center. The NESSUS code has been successfully applied to the reliability estimation of a variety of structural engineering systems. This study examines whether the features of NESSUS could be used to investigate the reliability of systems in other disciplines such as heat transfer, fluid mechanics, electrical circuits etc., without considerable programming effort specific to each discipline. In this study, the mechanical equivalence between system behavior models in different disciplines are investigated to achieve this objective. A new methodology is presented for the analysis of heat transfer, fluid flow, and electrical circuit problems using the structural analysis routines within NESSUS, by utilizing the equivalence between the computational quantities in different disciplines. This technique is integrated with the fast probability integration and system reliability techniques within the NESSUS code, to successfully compute the system reliability of multidisciplinary systems. Traditional as well as progressive failure analysis methods for system reliability estimation are demonstrated, through a numerical example of a heat exchanger system involving failure modes in structural, heat transfer and fluid flow disciplines.

  13. Electric power monthly with data for October 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council regions. Statistics are published on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. A monthly utility update and summary of industry developments are also included. 63 tabs., 1 fig.

  14. Electric power monthly with data for August 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    This publication provides monthly statistics at the state, census division, and U.S. levels for net generation; fossil fuel consumption and stocks, quantity, and quality of fossil fuels; cost of fossil fuels; electricity retail sales; associated revenue; and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council regions. Statistics on net generation are published by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The monthly update is summarized, and industry developments are briefly described. 1 fig., 63 tabs.

  15. Innovations in power systems reliability

    CERN Document Server

    Santora, Albert H; Vaccaro, Alfredo

    2011-01-01

    Electrical grids are among the world's most reliable systems, yet they still face a host of issues, from aging infrastructure to questions of resource distribution. Here is a comprehensive and systematic approach to tackling these contemporary challenges.

  16. 78 FR 44187 - National Women's Business Council

    Science.gov (United States)

    2013-07-23

    ... SMALL BUSINESS ADMINISTRATION National Women's Business Council ACTION: Notice of open Federal..., and agenda for the next meeting of the National Women's Business Council (NWBC). The meeting will be... the meeting of the National Women's Business Council. The National Women's Business Council is tasked...

  17. 77 FR 40400 - National Women's Business Council

    Science.gov (United States)

    2012-07-09

    ... SMALL BUSINESS ADMINISTRATION National Women's Business Council AGENCY: U.S. Small Business... Business Council (NWBC). The meeting will be open to the public. DATES: The meeting will be held on July 17... Business Council. The National Women's Business Council is tasked with providing policy recommendations on...

  18. Council | About IASc | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Council. The affairs and property of the Academy are administered by a Council of 20, consisting of a President, four Vice-Presidents, a Treasurer, two Secretaries, and twelve other members. The Council, with a term of three years, is elected by the Fellows triennially. Members of the Council for the period 2016 to 2018:.

  19. 76 FR 55363 - Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2011-09-07

    ... Pacific Fishery Management Council's (Pacific Council) Groundfish Management Team (GMT) [[Page 55364... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National...; telephone: (206) 526-6150. Council address: Pacific Fishery Management Council, 7700 NE Ambassador Place...

  20. 77 FR 75614 - Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2012-12-21

    ... Pacific Fishery Management Council's (Pacific Council) Highly Migratory Species Management Team (HMSMT... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National.... Council address: Pacific Fishery Management Council, 7700 NE. Ambassador Place, Suite 101, Portland, OR...

  1. 75 FR 80470 - Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2010-12-22

    ... Pacific Fishery Management Council's (Council) Groundfish Management Team (GMT) will hold a working... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National.... Council address: Pacific Fishery Management Council, 7700 NE. Ambassador Place, Suite 101, Portland, OR...

  2. Human reliability

    International Nuclear Information System (INIS)

    Embrey, D.E.

    1987-01-01

    Concepts and techniques of human reliability have been developed and are used mostly in probabilistic risk assessment. For this, the major application of human reliability assessment has been to identify the human errors which have a significant effect on the overall safety of the system and to quantify the probability of their occurrence. Some of the major issues within human reliability studies are reviewed and it is shown how these are applied to the assessment of human failures in systems. This is done under the following headings; models of human performance used in human reliability assessment, the nature of human error, classification of errors in man-machine systems, practical aspects, human reliability modelling in complex situations, quantification and examination of human reliability, judgement based approaches, holistic techniques and decision analytic approaches. (UK)

  3. Reliability Calculations

    DEFF Research Database (Denmark)

    Petersen, Kurt Erling

    1986-01-01

    Risk and reliability analysis is increasingly being used in evaluations of plant safety and plant reliability. The analysis can be performed either during the design process or during the operation time, with the purpose to improve the safety or the reliability. Due to plant complexity and safety...... and availability requirements, sophisticated tools, which are flexible and efficient, are needed. Such tools have been developed in the last 20 years and they have to be continuously refined to meet the growing requirements. Two different areas of application were analysed. In structural reliability probabilistic...... approaches have been introduced in some cases for the calculation of the reliability of structures or components. A new computer program has been developed based upon numerical integration in several variables. In systems reliability Monte Carlo simulation programs are used especially in analysis of very...

  4. Directive 96/ EC of the European Parliament and the Council of the European Union, as of 25 July 1996, announcing their common regulations for the EU internal electricity market

    International Nuclear Information System (INIS)

    1996-01-01

    The supplement to this issue of the journal, RdE 5/96, presents the German version of the full authentic text of the EU Directive 96/EC. This Directive lays down the regulations applicable within the EU, relating to electric power generation, transmission, and distribution in the EU internal electricity sector, as well as access to the internal market, criteria and procedures for bids and tenders, granting of license, and network operation. The text is also accessible under the following www address: http://www.heymanns.com. (orig./CB) [de

  5. 78 FR 63036 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2013-10-23

    ... Reliability Standards for the Bulk Power System, 130 FERC ] 61,200 (2010). \\8\\ Mandatory Reliability Standards... electric system operations across normal and contingency conditions. We also find that Reliability Standard... Reliability Standards for the Bulk Power System, 131 FERC ] 61,231 at P 21. Comments 24. NERC supports the...

  6. 77 FR 69869 - National Advisory Council on Alcohol Abuse and Alcoholism, National Advisory Council on Drug...

    Science.gov (United States)

    2012-11-21

    ... Alcohol Abuse and Alcoholism, National Advisory Council on Drug Abuse, and National Cancer Advisory Board... Advisory Council on Alcohol Abuse and Alcoholism, National Advisory Council on Drug Abuse, and National...: National Advisory Council on Alcohol Abuse and Alcoholism, National Advisory Council on Drug Abuse, and...

  7. Report made on the behalf of the Commission for Economic Affairs on the bill project, after accelerated procedure, ratifying decrees number 2016-1019 of July 27, 2016 related to electric power self-consumption, and number 2016-1059 of August 3, 2016 related to the production of electric power from renewable energies and aiming at adapting some arrangements related to power and gas networks and to renewable energies (number 4122). Nr 4192 + Impact study and Recommendations of the Council of State

    International Nuclear Information System (INIS)

    Santais, Beatrice

    2016-01-01

    This official report contains re-transcriptions of debates of a commission about decrees containing measures related to power grids and gas networks, to renewable energies, and self-consumption of electric power, which are useful and even necessary for an efficient implementation of the law on energy transition and for a 'green' growth. These debates addressed and discussed the content of the various articles which are more precisely presented and commented in the second part of the report. For each article, the report contains a synthesis of the Commission's opinion and possible amendments. The articles concerns the ratification of the two decrees, the definition of self-consumed production, the modification of some basic notions appearing in the Code of Energy, the exclusion of net-metering systems, the interdiction of a valorisation of original guarantees of renewable electric power production already benefiting of a public support, a new tariffing of these installations, the modification of the type of gas introduced in networks, and the possibility of using a bidding procedure to develop biogas production capacities. An impact study and the recommendations of the Council of State are attached in appendix

  8. Croatian energy regulatory council - independent Croatian regulatory body

    International Nuclear Information System (INIS)

    Klepo, M.

    2002-01-01

    By means of approving five energy laws, the Republic of Croatia established an appropriate legislative framework for energy sector regulation. A series of sub-law acts is presently being elaborated as well as some additional documents in order to bring about transparent and non-discriminatory provisions for the establishment of electric energy, gas, oil/oil derivatives and thermal energy markets, i.e. for the introduction and management of market activities and public services. A considerable share of these activities relates to the definition of transparent regulatory mechanisms that would guarantee the implementation of regulation rules based on the law, and be carried out by the independent regulatory body - Croatian Energy Regulatory Council. The Council's rights and obligations include firm executive functions, which present obligations to every energy entity. A dissatisfied party may set in motion a settlement of dispute, if it maintains that the decisions are not based on the law or reveal a flaw in the procedure. Therefore, it is the Council's priority to always make careful and law-abiding decisions. This paper gives insight into the regulatory framework elements based on the laws including the Council's organisational structure and non-profit entities that will prepare act proposals for the Council and perform other professional activities. (author)

  9. Increase of reliability of contact networks of electric transport, due to increase of strength of the joint unit of pipes of different diameters

    Science.gov (United States)

    Sabitov, L. S.; Kashapov, N. F.; Gilmanshin, I. R.; Gatiyatov, I. Z.; Kuznetsov, I. L.

    2017-09-01

    The feature of the stress state of the supports of the contact networks is the presence of a joint of pipes of different diameters, the ultimate state of which is determined, as a rule, the strength of the weld. The proposed unit allows to increase the reliability and strength of the connection and also exclude the presence of a weld bead on the outer surface of the pipe of smaller diameter in the place of its attachment to the upper end of the support ring.

  10. 76 FR 54216 - Pacific Fishery Management Council (Council); Work Session To Review Proposed Salmon Methodology...

    Science.gov (United States)

    2011-08-31

    ... Fishery Management Council (Council); Work Session To Review Proposed Salmon Methodology Changes AGENCY.... ACTION: Notice of a public meeting. SUMMARY: The Pacific Fishery Management Council's Salmon Technical Team (STT), Scientific and Statistical Committee (SSC) Salmon Subcommittee, and Model Evaluation...

  11. 2011 Elections to Staff Council

    CERN Multimedia

    Staff Association

    2011-01-01

    Vote Elections to fill all seats in the Staff Council are being organized this month. Voting will begin on Monday 31 October. Make your voice heard and be many to elect the new Staff Council. By doing so, you will be encouraging the men and women who will  represent you over the next two years and they will doubtless appreciate your gratitude. More details on the elections can be found on the Staff Association web site. (http://association.web.cern.ch) Elections Timetable Monday 31 October, at noon start date for voting Monday 14 November, at noon closing date for voting Monday 21 November, publication of the results in Echo Tuesday 22 and Wednesday 29 November Staff Association Assizes Tuesday 6 December, at 10.00 a.m. first meeting of the new Staff Council and election of the new Executive Committee The voting procedure is monitored by the Election Committee. 

  12. Reliability Engineering

    CERN Document Server

    Lazzaroni, Massimo

    2012-01-01

    This book gives a practical guide for designers and users in Information and Communication Technology context. In particular, in the first Section, the definition of the fundamental terms according to the international standards are given. Then, some theoretical concepts and reliability models are presented in Chapters 2 and 3: the aim is to evaluate performance for components and systems and reliability growth. Chapter 4, by introducing the laboratory tests, puts in evidence the reliability concept from the experimental point of view. In ICT context, the failure rate for a given system can be

  13. Reliability training

    Science.gov (United States)

    Lalli, Vincent R. (Editor); Malec, Henry A. (Editor); Dillard, Richard B.; Wong, Kam L.; Barber, Frank J.; Barina, Frank J.

    1992-01-01

    Discussed here is failure physics, the study of how products, hardware, software, and systems fail and what can be done about it. The intent is to impart useful information, to extend the limits of production capability, and to assist in achieving low cost reliable products. A review of reliability for the years 1940 to 2000 is given. Next, a review of mathematics is given as well as a description of what elements contribute to product failures. Basic reliability theory and the disciplines that allow us to control and eliminate failures are elucidated.

  14. Improving motor reliability in nuclear power plants: Volume 2, Functional indicator tests on a small electric motor subjected to accelerated aging

    International Nuclear Information System (INIS)

    Subudhi, M.; Taylor, J.H.; Lofaro, R.; Sugarman, A.C.; Sheets, M.W.; Skreiner, K.M.

    1987-11-01

    A ten horsepower electric motor was artificially aged by plug reverse cycling for test purposes. The motor was manufactured in 1967 and was in service at a commercial nuclear power plant for twelve years. Various tests were performed on the motor throughout the aging process. The motor failed after 3.79 million reversals (3 seconds per reversal) over seven months of testing. Each test parameter was trended to assess its suitability in monitoring aging and service wear degradation in motors. Results and conclusions are discussed relative to the applicability of the tests performed to nuclear power plant motor maintenance programs. 15 refs., 28 figs., 1 tab

  15. States of Cybersecurity: Electricity Distribution System Discussions

    Energy Technology Data Exchange (ETDEWEB)

    Pena, Ivonne [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ingram, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Martin, Maurice [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-03-16

    State and local entities that oversee the reliable, affordable provision of electricity are faced with growing and evolving threats from cybersecurity risks to our nation's electricity distribution system. All-hazards system resilience is a shared responsibility among electric utilities and their regulators or policy-setting boards of directors. Cybersecurity presents new challenges and should be a focus for states, local governments, and Native American tribes that are developing energy-assurance plans to protect critical infrastructure. This research sought to investigate the implementation of governance and policy at the distribution utility level that facilitates cybersecurity preparedness to inform the U.S. Department of Energy (DOE), Office of Energy Policy and Systems Analysis; states; local governments; and other stakeholders on the challenges, gaps, and opportunities that may exist for future analysis. The need is urgent to identify the challenges and inconsistencies in how cybersecurity practices are being applied across the United States to inform the development of best practices, mitigations, and future research and development investments in securing the electricity infrastructure. By examining the current practices and applications of cybersecurity preparedness, this report seeks to identify the challenges and persistent gaps between policy and execution and reflect the underlying motivations of distinct utility structures as they play out at the local level. This study aims to create an initial baseline of cybersecurity preparedness within the distribution electricity sector. The focus of this study is on distribution utilities not bound by the cybersecurity guidelines of the North American Electric Reliability Corporation (NERC) to examine the range of mechanisms taken by state regulators, city councils that own municipal utilities, and boards of directors of rural cooperatives.

  16. Design and simulation of a novel E-mode GaN MIS-HEMT based on a cascode connection for suppression of electric field under gate and improvement of reliability

    Science.gov (United States)

    Li, Weiyi; Zhang, Zhili; Fu, Kai; Yu, Guohao; Zhang, Xiaodong; Sun, Shichuang; Song, Liang; Hao, Ronghui; Fan, Yaming; Cai, Yong; Zhang, Baoshun

    2017-07-01

    We proposed a novel AlGaN/GaN enhancement-mode (E-mode) high electron mobility transistor (HEMT) with a dual-gate structure and carried out the detailed numerical simulation of device operation using Silvaco Atlas. The dual-gate device is based on a cascode connection of an E-mode and a D-mode gate. The simulation results show that electric field under the gate is decreased by more than 70% compared to that of the conventional E-mode MIS-HEMTs (from 2.83 MV/cm decreased to 0.83 MV/cm). Thus, with the discussion of ionized trap density, the proposed dual-gate structure can highly improve electric field-related reliability, such as, threshold voltage stability. In addition, compared with HEMT with field plate structure, the proposed structure exhibits a simplified fabrication process and a more effective suppression of high electric field. Project supported by the Key Technologies Support Program of Jiangsu Province (No. BE2013002-2) and the National Key Scientific Instrument and Equipment Development Projects of China (No. 2013YQ470767).

  17. Members of the State Council of Geneva

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    Luncheon hosted by the Director-General for members of the State Council of Geneva: From left to right A. Naudi; J. May; M. Carlo Lamprecht, State Council - Employement, Foreign Office and Economic Departement; M. Robert Hensler, State Chancellor; L. Maiani, CERN Director General; H.F. Hoffmann; M. Robert Cramer, State Council - Environment, Agriculture and Interior Departement; J.Van Der Boon; M. Laurent Moutinot, State Council - Installation, equipment and housing Departement; C. Détraz; C. Wyss; P. Jenni; G. Hentsch; M. Pierre-François Unger, State Council - Health and Social Action Departement; G. Stassinakis; M. Bourquin, CERN Council President.

  18. Electrical machines diagnosis

    CERN Document Server

    Trigeassou, Jean-Claude

    2013-01-01

    Monitoring and diagnosis of electrical machine faults is a scientific and economic issue which is motivated by objectives for reliability and serviceability in electrical drives.This book provides a survey of the techniques used to detect the faults occurring in electrical drives: electrical, thermal and mechanical faults of the electrical machine, faults of the static converter and faults of the energy storage unit.Diagnosis of faults occurring in electrical drives is an essential part of a global monitoring system used to improve reliability and serviceability. This diagnosis is perf

  19. Reliability calculations

    International Nuclear Information System (INIS)

    Petersen, K.E.

    1986-03-01

    Risk and reliability analysis is increasingly being used in evaluations of plant safety and plant reliability. The analysis can be performed either during the design process or during the operation time, with the purpose to improve the safety or the reliability. Due to plant complexity and safety and availability requirements, sophisticated tools, which are flexible and efficient, are needed. Such tools have been developed in the last 20 years and they have to be continuously refined to meet the growing requirements. Two different areas of application were analysed. In structural reliability probabilistic approaches have been introduced in some cases for the calculation of the reliability of structures or components. A new computer program has been developed based upon numerical integration in several variables. In systems reliability Monte Carlo simulation programs are used especially in analysis of very complex systems. In order to increase the applicability of the programs variance reduction techniques can be applied to speed up the calculation process. Variance reduction techniques have been studied and procedures for implementation of importance sampling are suggested. (author)

  20. The cost of reliability

    International Nuclear Information System (INIS)

    Ilic, M.

    1998-01-01

    In this article the restructuring process under way in the US power industry is being revisited from the point of view of transmission system provision and reliability was rolled into the average cost of electricity to all, it is not so obvious how is this cost managed in the new industry. A new MIT approach to transmission pricing is here suggested as a possible solution [it

  1. Report on progress in creating the internal gas and electricity market. Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions

    International Nuclear Information System (INIS)

    2010-01-01

    In late 2008 and 2009, the world was hit by the financial and economic crisis. This had a direct impact on the demand for energy, causing unpredicted falls in the price of oil on the international markets. This, in turn, impacted on gas and electricity prices. A dispute between two companies outside the EU (Gazprom of Russia and Naftogaz of Ukraine) led to an unprecedented crisis in the EU's gas supply. Between 6 and 20 January 2009, gas flows from Russia to the EU via Ukraine were interrupted, affecting several Member States. 2009 was also an important year because the third internal energy market package was adopted on 13 July 2009. The third package strengthens the regulatory framework that is needed in order to make market opening fully effective, in the interest of achieving the lowest possible energy prices, better energy security and sustainability. This report discusses how the developments described above have impacted on the EU electricity and gas markets over the past year and how they are likely to affect market developments in the future.

  2. Systems reliability/structural reliability

    International Nuclear Information System (INIS)

    Green, A.E.

    1980-01-01

    The question of reliability technology using quantified techniques is considered for systems and structures. Systems reliability analysis has progressed to a viable and proven methodology whereas this has yet to be fully achieved for large scale structures. Structural loading variants over the half-time of the plant are considered to be more difficult to analyse than for systems, even though a relatively crude model may be a necessary starting point. Various reliability characteristics and environmental conditions are considered which enter this problem. The rare event situation is briefly mentioned together with aspects of proof testing and normal and upset loading conditions. (orig.)

  3. Region-specific study of the electric utility industry. Phase I, final report

    International Nuclear Information System (INIS)

    Wacaster, A.J.

    1985-07-01

    This report describes the financial background of the electric utility industry in VACAR, reports on the present condition of the industry and then assesses the future of this industry. The Virginia-Carolinas subregion (VACAR) of the Southeastern Electric Reliability Council (SERC) was selected for this regional study because of its cooperativeness and its representative mix of powerplants, for example coal, hydro, nuclear, oil. It was found that the supply of future economic electricity is in jeopardy because of the regulatory process, the increasing risk associated with large scale generating stations and the weakening of the nuclear option. A number of options for the future were considered, including deregulation, government ownership and retaining the present system with modifications. The option selected to improve the present condition of the electricity industry was to make the present system work. The present system is sound, and with modifications, problems could be solved within the existing framework. 8 figs., 4 tabs

  4. Fiscal councils and economic volatility

    Czech Academy of Sciences Publication Activity Database

    Geršl, A.; Jašová, M.; Zápal, Jan

    2014-01-01

    Roč. 64, č. 3 (2014), s. 190-212 ISSN 0015-1920 Grant - others:UK(CZ) UNCE 204005/2012 Institutional support: PRVOUK-P23 Keywords : dynamic inconsistency * fiscal and monetary policy interaction * independent fiscal council Subject RIV: AH - Economic s Impact factor: 0.420, year: 2014 http://journal.fsv.cuni.cz/storage/1298_jasova.pdf

  5. A busy week for Council

    CERN Multimedia

    2009-01-01

    This has been a busy week for the CERN Council, and there is much to report. Firstly, I’m pleased to say that Council approved the Organization’s Medium Term Plan, and with it the budget for financial year 2010. In a time of global recession, this is a strong vote of confidence from the Member States. This meeting of Council provided an opportunity for the working group on the scientific and geographical enlargement of CERN to set out a roadmap towards its final report, which is to be made at Council’s December session this year. One part of the process over the coming months is to bring the major players in particle physics from beyond the European region into the discussion, ensuring that the working group’s recommendations lead to an optimum position for CERN and European particle physics in the global context. An indicator of the continuing attractiveness of CERN is the fact that Council has received four new applications...

  6. Council celebrates CERN Control Centre

    CERN Multimedia

    2006-01-01

    With the unveiling of its new sign, the CERN Control Centre was officially inaugurated on Thursday 16 March. To celebrate its startup, CERN Council members visited the sleek centre, a futuristic-looking room filled with a multitude of monitoring screens.

  7. Meeting of the ITER Council

    International Nuclear Information System (INIS)

    Drew, M.

    2001-01-01

    Full text: A meeting of the ITER Council took place in Toronto, Canada, on 27-28 February 2001 (Canada participates in the ITER EDA as an associate of the EU Party). The delegations to the Council were led by Dr. U. Finzi, Principal Advisor in charge of Fusion R and D in the Directorate-General for Research of the European Commission, Mr. T. Sugawa, Deputy Director-General of the Research and Development Bureau of the Ministry of Education, Culture, Sport, Science and Technology of Japan, and Academician E. Velikhov, President of the RRC ''Kurchatov Institute''. The European delegation was joined by Canadian experts including a representative from the Canadian Department of Natural Resources. The Council heard presentations from Dr. H. Kishimoto on the successful completion of the Explorations concerning future joint implementation of ITER, and from Dr. J.-P. Rager on the ITER International Industry Liaison Meeting held in Toronto in November 2000. Having noted statements of Parties' status, in particular concerning the readiness to start negotiations and the progress toward site offers, the Council encouraged the Parties to pursue preparations toward future implementation of ITER along the general lines proposed in the Explorers' final report. The Council also noted the readiness the of the RF and EU Parties to instruct specified current JCT members to remain at their places of assignment after the end of the EDA, in preparation for a transition to the Co-ordinated Technical Activities foreseen as support to ITER negotiations. The Council was pleased to hear that meetings with the Director of the ITER Parties' Designated Safety Representatives had started, and commended the progress toward achieving timely licensing processes with a good common understanding. The Council noted with appreciation the Director's view that no difficulties of principle in the licensing approach had been identified during the informal discussions with the regulatory representatives and

  8. News from Council - September 2016

    CERN Multimedia

    2016-01-01

    I would like to inform you of the main news from the Council this week. First of all, the Council congratulated CERN and the Collaborations on the superb performance of the accelerator complex and experiments. It has been a great year so far, with important physics results across the whole spectrum of the CERN research programme.   Looking forward, one of the main accomplishments from this week’s meetings is that the Council has approved the opening of a credit facility with the European Investment Bank (EIB) to cover the cash shortage during the peak years of the High-Luminosity LHC (HL-LHC) construction. This is very good news since it will allow us to carry out the work necessary for the HL-LHC without compromising the rest of the Laboratory’s scientific programme. Turning to the scientific and geographical enlargement, the Council approved the admission of India as an Associate Member State, and I very much hope that the agreement can be signed in the near future so that Indi...

  9. Electric power monthly, May 1999, with data for February 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatt hour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 64 tabs.

  10. Electric power monthly: October 1996, with data for July 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. This report contains approximately 60 tables.

  11. Queensland Energy Advisory Council's, annual review and energy statistics, 1982

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Queensland Energy Advisory Council (QEAC) role covers all forms of energy including renewable, non-renewable, commercialised and non-commercialised energy forms or proposals. While coal developments and electricity matters are discussed and monitored at meetings, the Mines Department and the State Electricity Commission, respectively, retain responsibility for most aspects in these energy sectors. In such cases QEAC's expertise and role is limited and is advisory. In other areas such as energy conservation, management of liquid fuel emergencies, natural gas supply and demand, solar energy, coal conversion, and ethanol production, QEAC made a significant contribution to policy development in 1981/82.

  12. 77 FR 61466 - National Women's Business Council

    Science.gov (United States)

    2012-10-09

    ... SMALL BUSINESS ADMINISTRATION National Women's Business Council AGENCY: U.S. Small Business... Business Council (NWBC). The meeting will be open to the public. DATES: The meeting will be held on October... [[Page 61467

  13. National Council on Alcoholism and Drug Dependence

    Science.gov (United States)

    ... Month NCADD National Council on Alcoholism and Drug Dependence Addiction is a Disease - Treatment is Available - Recovery ... years, The National Council on Alcoholism and Drug Dependence, Inc. (NCADD) has been a valuable resource for ...

  14. Study to determine the reliability and validity of a needs-assessment instrument used within the mechanical maintenance field of the nuclear electrical-generating industry

    International Nuclear Information System (INIS)

    Russell, L.O.

    1982-01-01

    This study was to determine if task parameter ratings provided by nuclear power plant maintenance mechanics assessed the true task frequency, criticality, and difficulty. This was to measure the data's usefulness as a training needs assessment indicator. A questionnaire entitled Job Task Questionnaire for Maintenance Mechanics was developed and used to collect data from job incumbents. Development was based on plant visits and incumbent interviews. Duties, tasks, parameters, and scales were then compiled to form the questionnaire. The questionnaire was then pilot tested. A random sample was selected from the national population of nuclear power plant maintenance mechanics. This resulted in a sample which was stratified across the job title and random within the job title. The descriptive analysis did not tend to indicate that the mean value of each task parameter provided a true or valid value. The overall conclusion drawn from the data analysis was that the ratings did not provide a substantially valid or reliable indication on which to base task training needs

  15. Human reliability

    International Nuclear Information System (INIS)

    Bubb, H.

    1992-01-01

    This book resulted from the activity of Task Force 4.2 - 'Human Reliability'. This group was established on February 27th, 1986, at the plenary meeting of the Technical Reliability Committee of VDI, within the framework of the joint committee of VDI on industrial systems technology - GIS. It is composed of representatives of industry, representatives of research institutes, of technical control boards and universities, whose job it is to study how man fits into the technical side of the world of work and to optimize this interaction. In a total of 17 sessions, information from the part of ergonomy dealing with human reliability in using technical systems at work was exchanged, and different methods for its evaluation were examined and analyzed. The outcome of this work was systematized and compiled in this book. (orig.) [de

  16. Microelectronics Reliability

    Science.gov (United States)

    2017-01-17

    inverters  connected in a chain. ................................................. 5  Figure 3  Typical graph showing frequency versus square root of...developing an experimental  reliability estimating methodology that could both illuminate the  lifetime  reliability of advanced devices,  circuits and...or  FIT of the device. In other words an accurate estimate of the device  lifetime  was found and thus the  reliability  that  can  be  conveniently

  17. 76 FR 62133 - National Women's Business Council

    Science.gov (United States)

    2011-10-06

    ... SMALL BUSINESS ADMINISTRATION National Women's Business Council AGENCY: U.S. Small Business... Business Council (NWBC). The meeting will be open to the public. DATES: The meeting will be held on Monday...., Appendix 2), SBA announces the meeting of the National Women's Business Council. The National Women's...

  18. Governor's Council on Disabilities and Special Education

    Science.gov (United States)

    State Employees Governor's Council on Disabilities and Special Education DHSS State of Alaska Home ; Governor's Council on Disabilities and Special Education Page Content Untitled Document Patrick Reinhart : follow GCDSE to 40404 The Governor's Council on Disabilities & Special Education is pleased to award

  19. 78 FR 15928 - Forestry Research Advisory Council

    Science.gov (United States)

    2013-03-13

    ... apportionment of funds. Advisory Council Organization The Council will be comprised of not more than 20 members. The members appointed to the Council will be fairly balanced in terms of the points of view... relevancy to a membership category. Geographic balance and a balanced distribution among the categories are...

  20. Parent-School Councils in Beijing, China

    Science.gov (United States)

    Lewis, Wayne D.; Bjork, Lars G.; Zhao, Yuru; Chi, Bin

    2011-01-01

    This exploratory study examines how schools in Beijing have responded to a Chinese national policy mandate to establish and maintain parent councils. We surveyed principals and parent council members across schools in the Beijing municipality about the establishment and functions of their schools' parent councils. Survey results provide insights…

  1. 36 CFR 801.4 - Council comments.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Council comments. 801.4 Section 801.4 Parks, Forests, and Public Property ADVISORY COUNCIL ON HISTORIC PRESERVATION HISTORIC PRESERVATION REQUIREMENTS OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.4 Council comments. The following...

  2. 76 FR 74049 - National Coal Council

    Science.gov (United States)

    2011-11-30

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Office of Fossil Energy, Department of Energy..., notice is hereby given that the National Coal Council will be renewed for a two-year period beginning... general policy matters relating to coal issues. Additionally, the renewal of the Council has been...

  3. 78 FR 7424 - National Coal Council

    Science.gov (United States)

    2013-02-01

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the National Coal Council (NCC). The Federal Advisory... 2013 meeting of the National Coal Council. Agenda: 1. Opening Remarks by NCC Chairman John Eaves 2...

  4. 78 FR 71592 - National Coal Council

    Science.gov (United States)

    2013-11-29

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Department of Energy, Office of Fossil Energy..., notice is hereby given that the National Coal Council (NCC) will be renewed for a two-year period. The... matters relating to coal issues. Additionally, the renewal of the National Coal Council has been...

  5. 78 FR 23242 - National Coal Council

    Science.gov (United States)

    2013-04-18

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Department of Energy. ACTION: Notice of open meetings. SUMMARY: This notice announces two meetings of the National Coal Council (NCC). The Federal...: Agenda for Thursday, May 16, 2013 1. Call to Order by John Eaves, Chairman, National Coal Council 2...

  6. 78 FR 40131 - National Petroleum Council

    Science.gov (United States)

    2013-07-03

    ... DEPARTMENT OF ENERGY National Petroleum Council AGENCY: Office of Fossil Energy, Department of... Petroleum Council. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public... Administrative Matters Discussion of Any Other Business Properly Brought Before the National Petroleum Council...

  7. 77 FR 42297 - National Petroleum Council

    Science.gov (United States)

    2012-07-18

    ... DEPARTMENT OF ENERGY National Petroleum Council AGENCY: Department of Energy, Office of Fossil... National Petroleum Council. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that... Matters Discussion of Any Other Business Properly Brought Before the National Petroleum Council...

  8. 76 FR 53889 - National Petroleum Council

    Science.gov (United States)

    2011-08-30

    ... DEPARTMENT OF ENERGY National Petroleum Council AGENCY: Department of Energy, Office of Fossil... Petroleum Council. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public... Properly Brought Before the National, Petroleum Council, Adjournment. Public Participation: The meeting is...

  9. 76 FR 37064 - Gulf of Mexico Fishery Management Council (Council); Public Meeting

    Science.gov (United States)

    2011-06-24

    ... meeting. SUMMARY: The Gulf of Mexico Fishery Management Council will convene a public meeting via webinar... meeting will be held via webinar. Council address: Gulf of Mexico Fishery Management Council, 2203 North... Executive Director, Gulf of Mexico Fishery Management Council; telephone: (813) 348-1630. SUPPLEMENTARY...

  10. 75 FR 31418 - Intermountain Region, Payette National Forest, Council Ranger District; Idaho; Mill Creek-Council...

    Science.gov (United States)

    2010-06-03

    ... Ranger District; Idaho; Mill Creek--Council Mountain Landscape Restoration Project AGENCY: Forest Service... the Mill Creek--Council Mountain Landscape Restoration Project. The approximate 51,900 acre project area is located about two miles east of Council, Idaho. The Mill Creek--Council Mountain Landscape...

  11. Reliability issues : a Canadian perspective

    International Nuclear Information System (INIS)

    Konow, H.

    2004-01-01

    A Canadian perspective of power reliability issues was presented. Reliability depends on adequacy of supply and a framework for standards. The challenges facing the electric power industry include new demand, plant replacement and exports. It is expected that demand will by 670 TWh by 2020, with 205 TWh coming from new plants. Canada will require an investment of $150 billion to meet this demand and the need is comparable in the United States. As trade grows, the challenge becomes a continental issue and investment in the bi-national transmission grid will be essential. The 5 point plan of the Canadian Electricity Association is to: (1) establish an investment climate to ensure future electricity supply, (2) move government and industry towards smart and effective regulation, (3) work to ensure a sustainable future for the next generation, (4) foster innovation and accelerate skills development, and (5) build on the strengths of an integrated North American system to maximize opportunity for Canadians. The CEA's 7 measures that enhance North American reliability were listed with emphasis on its support for a self-governing international organization for developing and enforcing mandatory reliability standards. CEA also supports the creation of a binational Electric Reliability Organization (ERO) to identify and solve reliability issues in the context of a bi-national grid. tabs., figs

  12. Predictive analysis on the electric energy distribution systems reliability: applying the synerGEE system; Analisis predictivo de la confiabilidad en los sistemas de distribucion de energia electrica: aplicando el sistema synerGEE

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez Andrade, Carlos

    2008-12-15

    Electrical distribution systems ought to deliver electric power as economical as possible with an acceptable degree of service quality and continuity. Nevertheless, their faults represent one of the main causes of customer's unavailability. At the moment, a wide range of determinist criteria in the improvement of systems reliability based on past behavior are used, but they do not respond to the stochastic nature of system behavior, and are applied without an adequate balance between reliability and economy. In order to obtain this balance a minimum cost planning methodology that considers the predictive analysis of different investment alternatives in addition to the past behavior of the system is required, which guarantees that the economic resource available and limited will be used to gather the greater possible reliability degree. In this work this problem is approached with the fundamentals and methodologies needed to assess the design effects and operative criteria over the main reliability indexes used by the main utilities around the world, with emphasis on the need to optimize economical resources. The use of the system SynerGEETM, is investigated, probing it as a useful tool for the predictive reliability analysis. Due to the lack of experience that exists in Mexico with this type of analysis, distribution engineers has to become familiar with the concepts of the reliability engineering, their application to establish distribution systems models, and acquiring the ability to use the modern simulation tools, allowing them to evaluate the behavior of these systems with enough analytical rigor. In this sense a serial of well known study cases are presented to help them in this labor. [Spanish] Los sistemas de distribucion de energia electrica deben satisfacer la demanda de energia electrica de la forma mas economica posible, con un grado de calidad y continuidad aceptable. Sin embargo, sus fallas son una de las principales causas de indisponibilidad en

  13. Effect of organic-buffer-layer on electrical property and environmental reliability of Ga-doped ZnO films prepared by RF plasma assisted DC magnetron sputtering on plastic substrate

    International Nuclear Information System (INIS)

    Hinoki, Toshio; Kyuhara, Chika; Agura, Hideaki; Yazawa, Kenji; Kinoshita, Kentaro; Ohmi, Koutoku; Kishida, Satoru

    2010-01-01

    Ga-doped ZnO (GZO) transparent conductive films have been prepared by RF plasma assisted DC magnetron sputtering under a reductive atmosphere on organic-buffer-layer (OBL) coated polyethylene telephthalate (PET) substrates without intentionally heating substrates. Electrical and optical properties, crystallinity, and environmental reliability of the GZO films have been investigated. The distributional characteristic of resistivity is observed in the GZO film deposited on the OBL-coated PET substrates. The high resistivity at facing the erosion area in the source target is reduced by providing the RF plasma and H 2 gas near the substrate, resulting in a uniform distribution of the sheet resistance. It has been also found that the increase of resistivity by an accelerated aging test performed under a storage condition at 60 o C and at a relative humidity of 95% is suppressed by employing the OBL. The OBL suppresses the formation of cracks, which are induced by the aging test. These facts are thought to contribute to a high environmental reliability of GZO films on PET substrates. Values of resistivity, Hall mobility and carrier concentration are obtained: 5.0-20 x 10 -3 Ω cm, 4.0 cm 2 /Vs, and 3.8 x 10 20 cm -3 , respectively. An average transmittance of the GZO film including OBL and PET substrate is 78% in a visible region. The OBL enables to realize the practical use of GZO films on PET sheets.

  14. Hybrid instrument applied to human reliability study in event of loss of external electric power in a nuclear power plant; Instrumento hibrido aplicado ao estudo da confiabilidade humana em evento de perda de energia eletrica externa em usina nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Eduardo Ferraz

    2015-04-01

    The study projects in highly complex installations involves robust modeling, supported by conceptual and mathematical tools, to carry out systematic research and structured the different risk scenarios that can lead to unwanted events from occurring equipment failures or human errors. In the context of classical modeling, the Probabilistic Safety Analysis (PSA) seeks to provide qualitative and quantitative information about the project particularity and their operational facilities, including the identification of factors or scenarios that contribute to the risk and consequent comparison options for increasing safety. In this context, the aim of the thesis is to develop a hybrid instrument (CPP-HI) innovative, from the integrated modeling techniques of Failure Mode and Effect Analysis (FMEA), concepts of Human Reliability Analysis and Probabilistic Composition of Preferences (PCP). In support of modeling and validation of the CPP-HI, a simulation was performed on a triggering event 'Loss of External Electric Power' - PEEE, in a Nuclear Power plant. The results were simulated in a virtual environment (sensitivity analysis) and are robust to the study of Human Reliability Analysis (HRA) in the context of the PSA. (author)

  15. Office of Electricity Delivery and Energy Reliability (OE) National Energy Technology Laboratory (NETL) American Recovery and Reinvestment Act 2009 United States Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Mohit [Seeo, Incorporated, Hayward, CA (United States); Grape, Ulrik [Seeo, Incorporated, Hayward, CA (United States)

    2014-07-29

    The purpose of this project was for Seeo to deliver the first ever large-scale or grid-scale prototype of a new class of advanced lithium-ion rechargeable batteries. The technology combines unprecedented energy density, lifetime, safety, and cost. The goal was to demonstrate Seeo’s entirely new class of lithium-based batteries based on Seeo’s proprietary nanostructured polymer electrolyte. This technology can enable the widespread deployment in Smart Grid applications and was demonstrated through the development and testing of a 10 kilowatt-hour (kWh) prototype battery system. This development effort, supported by the United States Department of Energy (DOE) enabled Seeo to pursue and validate the transformational performance advantages of its technology for use in grid-tied energy storage applications. The focus of this project and Seeo’s goal as demonstrated through the efforts made under this project is to address the utility market needs for energy storage systems applications, especially for residential and commercial customers tied to solar photovoltaic installations. In addition to grid energy storage opportunities Seeo’s technology has been tested with automotive drive cycles and is seen as equally applicable for battery packs for electric vehicles. The goals of the project were outlined and achieved through a series of specific tasks, which encompassed materials development, scaling up of cells, demonstrating the performance of the cells, designing, building and demonstrating a pack prototype, and providing an economic and environmental assessment. Nearly all of the tasks were achieved over the duration of the program, with only the full demonstration of the battery system and a complete economic and environmental analysis not able to be fully completed. A timeline over the duration of the program is shown in figure 1.

  16. 78 FR 64200 - Caribbean Fishery Management Council; Public Meetings

    Science.gov (United States)

    2013-10-28

    ... Caribbean Fishery Management Council's (Council) Scientific and Statistical Committee (SSC) will hold... Fishery Management Council; Public Meetings AGENCY: National Marine Fisheries Service (NMFS), National... held at the Caribbean Fishery Management Council Headquarters, located at 270 Mu[ntilde]oz Rivera...

  17. 75 FR 33245 - Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2010-06-11

    ... Pacific Fishery Management Council's (Council) Groundfish Management Team (GMT) will hold a working... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National... be held at the Pacific Fishery Management Council office, Large Conference Room, 7700 NE Ambassador...

  18. 75 FR 49890 - Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2010-08-16

    ... Pacific Fishery Management Council's (Pacific Council) Coastal Pelagic Species Management Team (CPSMT) and... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National... will be available at the following location: Pacific Fishery Management Council, Small Conference Room...

  19. Reliability evaluation of smart distribution grids

    OpenAIRE

    Kazemi, Shahram

    2011-01-01

    The term "Smart Grid" generally refers to a power grid equipped with the advanced technologies dedicated for purposes such as reliability improvement, ease of control and management, integrating of distributed energy resources and electricity market operations. Improving the reliability of electric power delivered to the end users is one of the main targets of employing smart grid technologies. The smart grid investments targeted for reliability improvement can be directed toward the generati...

  20. 2017 Elections to Staff Council

    CERN Multimedia

    Staff Association

    2017-01-01

    Make your voice heard, support your candidates! We hope that you will be many to vote and to elect the new Staff Council! By doing so, you can support and encourage the women and men, who will represent you over the next two years. The voting takes place from 23 October to 13 November, at noon at https://ap-vote.web.cern.ch/elections-2017. Elections Timetable Monday 13 November, at noon Closing date for voting Tuesday 21 November and Tuesday 5 December Publication of the results in Echo Monday 27 and Tuesday 28 November Staff Association Assizes Tuesday 5 December (afternoon) First meeting of the new Staff Council and election of the new Executive Committee The voting procedure will be monitored by the Election Committee, which is also in charge of announcing the results in Echo on 21 November and 5 December. Candidates for the 2017 Elections

  1. Resolution of the Staff Council

    CERN Multimedia

    Staff Association

    2015-01-01

    You were many to attend the public information meetings organised in October and we thank you for your interest. In this decision phase of the current Five-Yearly Review of our employment conditions they provided an opportunity to review the Management proposals in detail. They were a moment of exchange also on the various topics under review, and your comments were many and very valuable. Meeting on Thursday 29th October, the Staff Council discussed once more these proposals. It considered that the "package" of proposed measures is not balanced enough in its current form. It decided to formulate additional requests to the Management, relating mainly to the effects of the introduction of the proposed new career system. The resolution adopted this morning also implies that the consultation of staff, originally foreseen next week, is postponed. The staff Council will reconvene in a special session on Thursday, 5th November to reassess its position depending on the progress made regarding its d...

  2. 2015 Elections to Staff Council

    CERN Multimedia

    Staff Asscociation

    2015-01-01

    Make your voice heard, support your candidates! Be many to vote and to elect the new Staff Council. By doing so, you will be encouraging the men and women who will represent you over the next two years and they will without doubt appreciate your gratitude. The voting takes place from the 26th of October to the 9th of November, at noon at https://ap-vote.web.cern.ch/elections-2015.   Elections Timetable Monday 9 November, at noon Closing date for voting Monday 16 and Monday 23 November, publication of the results in Echo Tuesday 8 December, at 10.00 a.m. first meeting of the new Staff Council and election of the new Executive Committee The voting procedure will be monitored by the Election Committee, which is also in charge of announcing the results in Echo on 16 and 24 November. Candidates for the 2015 elections

  3. French participation in the world energy council

    International Nuclear Information System (INIS)

    Carouge, Ch.; Roussely, F.; Francony, M.; Ailleret, F.; Bosseboeuf, D.; Moisan, F.; Villaron, Th.

    1999-01-01

    The Revue de l'Energie is presenting the most influential French interventions at the 17. Congress of the World Energy Council held in September 1998 in Houston, (USA). These represent only part of French participation in the congress since a total of 16 individuals from France took part in the various sessions. Their presentations cover very varied topics and are one of the things that testify to the interest that our energy industries have in the works and operations of the WEC. Some other figures also bear witness to this interest: 184 French congress members, which is one of the largest delegations after that of the United States, the host country of the congress; 11 technical presentation, covering a wide range of subjects: from the nuclear reactor of the future to the use of bagasse (cane trash) for the production of electricity, from the underground storage of natural gas to the production of extra-heavy crude petroleum. The technical exhibition associated to the Congress was a great success and there again the French presence was able to make its mark: five exhibitors were gathered in the France of 600 m 2 , the most sizeable non-American national area.But French participation in the work of the WEC is not limited to congresses. The French Energy Council [Conseil francais de l'Energie] is careful to ensure its presence both in the formal proceedings of the WEC and within the studies undertaken under its three-year programme. This active French presence is also essential in order to defend the official English-French bilingualism of the World Energy Council. In spite of the good will of the organizers and the support of the general secretary's office in London, the Houston Congress showed how difficult it was to maintain the use of the French language on English-speaking territory. This is a difficult task, one that has to be undertaken anew each time, but one that France and other French-speaking nations have decided to pursue to the end. (authors)

  4. 78 FR 58492 - Generator Verification Reliability Standards

    Science.gov (United States)

    2013-09-24

    ... power capability that is available for planning models and bulk electric system reliability assessments... of generator equipment needed to support Bulk-Power System reliability and enhance coordination of... support Bulk-Power System reliability and will ensure that accurate data is verified and made available...

  5. 77 FR 26714 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2012-05-07

    ... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g... Standards for the Bulk Power System, 130 FERC ] 61,200 (2010) (March 2010 Order). \\12\\ Mandatory Reliability... excluded from future planning assessments and its potential impact to bulk electric system reliability...

  6. 18 CFR 39.11 - Reliability reports.

    Science.gov (United States)

    2010-04-01

    ... Electric Reliability Organization shall conduct assessments of the adequacy of the Bulk-Power System in... assessments as determined by the Commission of the reliability of the Bulk-Power System in North America and... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reliability reports. 39...

  7. 46 CFR 169.619 - Reliability.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Reliability. 169.619 Section 169.619 Shipping COAST... Electrical Steering Systems § 169.619 Reliability. (a) Except where the OCMI judges it impracticable, the... be below that necessary for the safe navigation of the vessel. (c) The strength and reliability of...

  8. Reliability Assessment Of Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2014-01-01

    Reduction of cost of energy for wind turbines are very important in order to make wind energy competitive compared to other energy sources. Therefore the turbine components should be designed to have sufficient reliability but also not be too costly (and safe). This paper presents models...... for uncertainty modeling and reliability assessment of especially the structural components such as tower, blades, substructure and foundation. But since the function of a wind turbine is highly dependent on many electrical and mechanical components as well as a control system also reliability aspects...... of these components are discussed and it is described how there reliability influences the reliability of the structural components. Two illustrative examples are presented considering uncertainty modeling, reliability assessment and calibration of partial safety factors for structural wind turbine components exposed...

  9. The resistance councils in Uganda

    DEFF Research Database (Denmark)

    Tidemand, Per

    in the capitals. In my dissertation I propose to change that focus. Partly by paying particular attention to rural politics, partly through a discussion of democracy in a longer-term perspective using a broader definition of democracy and finally through a discussion of democracy as effective political...... participation rather than only form al rights. I shall do so by analysing the Resistance Councils (RCs) in Uganda....

  10. 2017 Elections to Staff Council

    CERN Multimedia

    Staff Association

    2017-01-01

    Make your voice heard, support your candidates! After verification by the Electoral Commission, all candidates for the elections to the Staff Council have been registered. It is now up to you, members of the Staff Association, to vote for the candidate(s) of your choice. We hope that you will be many to vote and to elect the new Staff Council! By doing so, you can support and encourage the women and men, who will represent you over the next two years. We are using an electronic voting system; all you need to do is click the link below and follow the instructions on the screen. https://ap-vote.web.cern.ch/elections-2017 The deadline for voting is Monday, 13 November at midday (12 pm). Elections Timetable Monday 13 November, at noon Closing date for voting Tuesday 21 November and Tuesday 5 December Publication of the results in Echo Monday 27 and Tuesday 28 November Staff Association Assizes Tuesday 5 December (afternoon) First meeting of the new Staff Council and election of the new Executive Committee The ...

  11. 18 CFR 701.76 - The Water Resources Council Staff.

    Science.gov (United States)

    2010-04-01

    ... Council Staff. 701.76 Section 701.76 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Headquarters Organization § 701.76 The Water Resources Council Staff. The Water Resources Council Staff (hereinafter the Staff) serves the Council and the Chairman in the performance of...

  12. Redefining reliability

    International Nuclear Information System (INIS)

    Paulson, S.L.

    1995-01-01

    Want to buy some reliability? The question would have been unthinkable in some markets served by the natural gas business even a few years ago, but in the new gas marketplace, industrial, commercial and even some residential customers have the opportunity to choose from among an array of options about the kind of natural gas service they need--and are willing to pay for. The complexities of this brave new world of restructuring and competition have sent the industry scrambling to find ways to educate and inform its customers about the increased responsibility they will have in determining the level of gas reliability they choose. This article discusses the new options and the new responsibilities of customers, the needed for continuous education, and MidAmerican Energy Company's experiment in direct marketing of natural gas

  13. 76 FR 70122 - Plan for Conduct of 2012 Electric Transmission Congestion Study

    Science.gov (United States)

    2011-11-10

    ... regional reliability councils, regional transmission organizations (RTOs) and independent system operators... transmission organizations (RTOs), independent system operators (ISOs), and other stakeholders to describe...

  14. Regional impacts of expanding gas-fired electric generation in the northeast US and eastern Canada

    International Nuclear Information System (INIS)

    Mitchell, G.

    2002-01-01

    New York, New England, Ontario, Quebec and Canada's Maritime provinces come under the jurisdiction of the Northeast Power Coordinating Committee (NPCC) of the North American Electric Reliability Council (NERC). The objective of this Council is to assist with the coordination of electric supply, as well as transmission planning and reliability for the utilities. The annual ten year forecast of electric supply, demand and fuel sources produced by the NERC formed the basis for the data presented. The deregulation of the electricity market in a few jurisdictions in the region resulted in the break-up of several electric utilities into their core components, namely, generation, distribution and transmission. The generation sector is where the fastest break-up activity is taking place, and merchant energy companies are emerging. Each of these merchant energy companies is competing against the other to effect sales into the wholesale power market through the building of at risk generation plants. The deregulation process is subjected to different processes and time tables depending on each state or province regulations. The construction of new power plants in the region is being driven by the merchant energy companies. They are building low capital cost and highly efficient natural gas combined-cycle base load plants as well as lower cost and moderately efficient natural gas/oil-fired simple-cycle peaking plants. This activity is mainly restricted to the United States, since hydroelectric power, coal and nuclear power are the main presence in Canada. New England experiences summer peaks while Canada has winter peak electric demand. To optimize intra-regional peak generation capacity sharing, there is an opportunity for the electric industry to move gas by wire, and a number of projects are being developed. It is expected that pipeline expansion will be lower in Quebec and Ontario and result in more capacity expansions from the Maritimes combined with intra

  15. Managing realities of the new market uncertainty : standards development in the North American electricity industry

    International Nuclear Information System (INIS)

    Green, B.

    2003-01-01

    Standards for the electricity industry are developed to ensure quality and serve as a basis to which utilities should conform. Standards specify agreed upon properties for a manufactured product. They should be used for equipment specifications as well as operational procedures. Standardization is performed by regulators, transmission owners/operators, and organizations such as the National Electric Reliability Council (NERC), the Northeast Power Coordinating Council (NPCC), the North American Energy Standards Board (NAESB), and the Committee of Chief Risk Officers (CCRO). Before markets were opened to competition, operational standards were dictated by transmission owners and reliability issues were dealt with by NERC and NPCC. This presentation explained the process of standardization in the electric power industry in Canada, the derivation of standards, moving beyond NERC, and the transmission owners. Issues for Ontario Power Generation were highlighted. In contrast to the situation in the United States, there is no federal government backstop for developing Standards in Canada. There is no federal initiative toward open access. Canadian utilities participated in NERC, but compliance was voluntary. It is still questionable if Canadian utilities will implement NERC and NAESB Standards if they are codified

  16. Perspectives of nuclear energy in the view of the World Energy Council

    International Nuclear Information System (INIS)

    Doucet, G.

    2003-01-01

    Since 1930, the World Energy Council (WEC) has been closely involved in problems associated with the use of nuclear power. At the meeting then held by the WEC Executive Committee in Berlin, Albert Einstein drew the attention of power utilities to this new source of energy. In addition to optimized use, technical progress, and waste management, the WEC regards aspects of safety, proliferation, and sustainability of nuclear power as matters of special importance. In the energy scenarios elaborated by the WEC since the 1980s, nuclear power plays one of the leading roles in the future energy mix. The sustainable management of energy resources, worldwide climate protection, but also equal access to energy for all people, require the use of nuclear power and the furtherance of its options. Moreover, the use of nuclear power in the industrialized countries helps to stabilize energy prices worldwide. This is in the interest especially of developing countries, for which low-cost, accessible energy sources are vital factors. The electricity supply crisis in California in 2001 has shown the continuity of supply to be one of the factors important in the deregulation of energy markets. Bottlenecks in electricity supply because of a lack of acceptance of electricity generation are problems affecting the future of industrialized countries. For instance, the increasing digitization of every-day life demands reliable power supply. In its studies of all available energy sources the WEC found no alternative to nuclear power. Factors of importance in the future development and use of nuclear power are public acceptance and the ability, and willingness, to take decisions in economic issues. Waste management, proliferation, safety, and research and development are other priorities. As a source of power protecting the climate, stabilizing costs, and offering a considerable potential, nuclear power is compatible with the objectives of sustainable development for the world of tomorrow

  17. Electric Arc Furnace as a Source of Emission of Polychlorinated Dibenzo-p-Dioxins and Polychlorinated Dibenzofurans in Perspective of the Council Directive 96/61 EC Concerning Integrated Pollution Prevention and Control

    Directory of Open Access Journals (Sweden)

    Sofilić, T.

    2008-01-01

    daily care for environmental protection and preservation. This Directive integrates control of emissions and overall impact of industrial installations on the environment, meaning recognition of the entire impact from particular industrial processes on the environment (air, water, soil, waste, noise, use of raw materials, energy efficiency, prevention of accidents, etc.. The IPPC Directive has introduced a system of authorization (environmental permit that needs to be obtained in order to perform business activities and run processes using the best available techniques (BAT.Taking into account the harmful impact of PCDDs/Fs on the environment, and their unavoidability in metallurgical processes, a series of methods has been developed for their partial prevention or at least reduction of their concentration in smoke gas discharge, and thus prevent environmental pollution through these very harmful compounds. In order to prevent the occurrence of PCDDs/Fs metallurgical processes often use methods based on the principle of selective catalyst reduction. For removal of the already generated PCDDs/Fs from waste gases methods of thermal decomposition at high temperatures or various sorption, i. e. "dry" and "wet" cleaning techniques are used.As the implementation of the IPPC Directive is a complex procedure requiring highly educated experts, significant investments into production processes and their modernization, or sometimeseven replacement, steel shops need to timely prepare themselves for the obligations in order to harmonize the existing regulation with the requirements of the IPPC Directive.The requirements of the Directive have to be studied thoroughly. The required steps have to be carefully thought through, previously identifying the cost and time frame necessary to bring the existing electric arc furnace (EAF steel production processes into conformance with the requirements of the IPPC Directive.The paper discusses the requirements of the IPPC Directive that are

  18. Proof tests on reliability

    International Nuclear Information System (INIS)

    Mishima, Yoshitsugu

    1983-01-01

    In order to obtain public understanding on nuclear power plants, tests should be carried out to prove the reliability and safety of present LWR plants. For example, the aseismicity of nuclear power plants must be verified by using a large scale earthquake simulator. Reliability test began in fiscal 1975, and the proof tests on steam generators and on PWR support and flexure pins against stress corrosion cracking have already been completed, and the results have been internationally highly appreciated. The capacity factor of the nuclear power plant operation in Japan rose to 80% in the summer of 1983, and considering the period of regular inspection, it means the operation of almost full capacity. Japanese LWR technology has now risen to the top place in the world after having overcome the defects. The significance of the reliability test is to secure the functioning till the age limit is reached, to confirm the correct forecast of deteriorating process, to confirm the effectiveness of the remedy to defects and to confirm the accuracy of predicting the behavior of facilities. The reliability of nuclear valves, fuel assemblies, the heat affected zones in welding, reactor cooling pumps and electric instruments has been tested or is being tested. (Kako, I.)

  19. Aerospace reliability applied to biomedicine.

    Science.gov (United States)

    Lalli, V. R.; Vargo, D. J.

    1972-01-01

    An analysis is presented that indicates that the reliability and quality assurance methodology selected by NASA to minimize failures in aerospace equipment can be applied directly to biomedical devices to improve hospital equipment reliability. The Space Electric Rocket Test project is used as an example of NASA application of reliability and quality assurance (R&QA) methods. By analogy a comparison is made to show how these same methods can be used in the development of transducers, instrumentation, and complex systems for use in medicine.

  20. Statement of the Pugwash council

    International Nuclear Information System (INIS)

    1997-01-01

    In the fiftieth year since the first and only use of nuclear weapons in war, the evidence of actual progress towards the elimination of such weapons is decidedly mixed. The statement of the Pugwash council involves the following issues: agenda for a nuclear-weapon-free world; reduction of proliferation risks; monitoring, control and reducing arms trade, transfer and production; global governance as a cooperative activity of states and non-governmental organisations to address the questions of global security; security in the Asia-Pacific region; and energy-environment-development interactions

  1. Photovoltaic performance and reliability workshop

    Energy Technology Data Exchange (ETDEWEB)

    Mrig, L. [ed.

    1993-12-01

    This workshop was the sixth in a series of workshops sponsored by NREL/DOE under the general subject of photovoltaic testing and reliability during the period 1986--1993. PV performance and PV reliability are at least as important as PV cost, if not more. In the US, PV manufacturers, DOE laboratories, electric utilities, and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in the field were brought together to exchange the technical knowledge and field experience as related to current information in this evolving field of PV reliability. The papers presented here reflect this effort since the last workshop held in September, 1992. The topics covered include: cell and module characterization, module and system testing, durability and reliability, system field experience, and standards and codes.

  2. Notification of upcoming AGU Council meeting

    Science.gov (United States)

    Williams, Billy

    2012-10-01

    The AGU Council will meet on Sunday, 2 December 2012, at the InterContinental Hotel in San Francisco, Calif. The meeting, which is open to all AGU members, will include discussions of AGU's new Grand Challenge Project (a project that will be introduced to members at the 2012 Fall Meeting), the proposed AGU scientific ethics policy, publishing strategies, future plans for honors and recognition, and leadership transition as new members join the Council. This year the Council experimented with a new approach to conducting business. By holding virtual meetings throughout the year, Council members have been able to act in a more timely manner and provide input on important membership and science issues on the Board of Directors' agenda. The Council Leadership Team—an elected subset of the Council—also experimented with a new approach, meeting every month to keep moving projects forward. This approach has increased communication and improved effectiveness in Council decision making.

  3. RTE - Reliability report 2016

    International Nuclear Information System (INIS)

    2017-06-01

    Every year, RTE produces a reliability report for the past year. This document lays out the main factors that affected the electrical power system's operational reliability in 2016 and the initiatives currently under way intended to ensure its reliability in the future. Within a context of the energy transition, changes to the European interconnected network mean that RTE has to adapt on an on-going basis. These changes include the increase in the share of renewables injecting an intermittent power supply into networks, resulting in a need for flexibility, and a diversification in the numbers of stakeholders operating in the energy sector and changes in the ways in which they behave. These changes are dramatically changing the structure of the power system of tomorrow and the way in which it will operate - particularly the way in which voltage and frequency are controlled, as well as the distribution of flows, the power system's stability, the level of reserves needed to ensure supply-demand balance, network studies, assets' operating and control rules, the tools used and the expertise of operators. The results obtained in 2016 are evidence of a globally satisfactory level of reliability for RTE's operations in somewhat demanding circumstances: more complex supply-demand balance management, cross-border schedules at interconnections indicating operation that is closer to its limits and - most noteworthy - having to manage a cold spell just as several nuclear power plants had been shut down. In a drive to keep pace with the changes expected to occur in these circumstances, RTE implemented numerous initiatives to ensure high levels of reliability: - maintaining investment levels of euro 1.5 billion per year; - increasing cross-zonal capacity at borders with our neighbouring countries, thus bolstering the security of our electricity supply; - implementing new mechanisms (demand response, capacity mechanism, interruptibility, etc.); - involvement in tests or projects

  4. Photovoltaic Module Reliability Workshop 2010: February 18-19, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, J.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  5. Photovoltaic Module Reliability Workshop 2012: February 28 - March 1, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  6. Photovoltaic Module Reliability Workshop 2011: February 16-17, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  7. Photovoltaic Module Reliability Workshop 2013: February 26-27, 2013

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, S.

    2013-10-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  8. Photovoltaic Module Reliability Workshop 2014: February 25-26, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, S.

    2014-02-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  9. 2015 Elections to Staff Council

    CERN Multimedia

    Staff Association

    2015-01-01

    Elections Timetable Monday 26 October, at noon Start date for voting Monday 9 November, at noon Closing date for voting Monday 16 and Monday 23 November, publication of the results in Echo Monday 23 and Tuesday 24 November Staff Association Assizes Tuesday 1st December, at 10.00 a.m. first meeting of the new Staff Council and election of the new Executive Committee The voting procedure will be monitored by the Election Committee, which is also in charge of announcing the results in Echo on 16 and 24 November. During its meeting of March 17 2015, the Staff Council approved the election rules, which define the allocation of seats in each department, as follows:   Number of seats in the electoral colleges Departments BE EN TE DG/DGS FP GS HR/PF IT PH Career paths AA - D 2 3 3 1 1 2 1 1 2 Career paths E - G 2 2 2 1 1 1 1 2 3   Global CERN Career paths AA - G 14     Number of seats for fellows representatives Global CERN 5 For more informat...

  10. 2015 Elections to Staff Council

    CERN Multimedia

    Staff Association

    2015-01-01

    Elections Timetable Monday 21 September, at noon Start date for receipt of the application Friday 16 October, at noon Closing date for receipt of the applications Monday 26 October, at noon Start date for voting Monday 9 November, at noon Closing date for voting Monday 16 and Monday 23 November, publication of the results in Echo Monday 23 and Tuesday 24 November Staff Association Assizes Tuesday 1st December, at 10.00 a.m. first meeting of the new Staff Council and election of the new Executive Committee The voting procedure will be monitored by the Election Committee, which is also in charge of announcing the results in Echo on 16 and 24 November. During its meeting of March 17 2015, the Staff Council approved the election rules, which define the allocation of seats in each department, as follows:   Number of seats in the electoral colleges Departments BE EN TE DG/DGS FP GS HR/PF IT PH Career paths AA - D 2 3 3 1 1 2 1 1 2 Career paths E - G 2 2 2 1 1 1 1 2 3   ...

  11. 78 FR 55114 - Native American Employment and Training Council (Council) Charter; Notice of Intent To Renew

    Science.gov (United States)

    2013-09-09

    ... equitable distribution of influence with the Council leadership; (3) opportunity for current members to take on more of a leadership role; (4) flexibility to maintain a healthy Council balance of experience and...

  12. 78 FR 26113 - Advisory Council on Transportation Statistics; Notice of Meeting

    Science.gov (United States)

    2013-05-03

    ... of Transportation Statistics (BTS) on the quality, reliability, consistency, objectivity, and... introduction of Council Members; (2) Discussion of the usefulness and visibility of current BTS products; (3) Strategies for assuring and enhancing quality of BTS products; (4) Preparations for reauthorization; (5...

  13. 77 FR 10616 - Advisory Council on Transportation Statistics; Notice of Meeting

    Science.gov (United States)

    2012-02-22

    .... 2) to advise the Bureau of Transportation Statistics (BTS) on the quality, reliability, consistency... budget; (4) Update on BTS data programs and future plans; (5) Council Members review and discussion of BTS programs and plans; (6) Public Comments and Closing Remarks. Participation is open to the public...

  14. 75 FR 54695 - Advisory Council on Transportation Statistics; Notice of Meeting

    Science.gov (United States)

    2010-09-08

    .... 2) to advise the Bureau of Transportation Statistics (BTS) on the quality, reliability, consistency... Strategic Plan and related BTS products; (4) Council Members review and discussion of statistical programs... E34-403, Washington, DC 20590, [email protected] or faxed to (202) 366-3640. BTS requests that...

  15. 77 FR 64375 - Advisory Council on Transportation Statistics; Notice of Meeting

    Science.gov (United States)

    2012-10-19

    ... of Transportation Statistics (BTS) on the quality, reliability, consistency, objectivity, and...) Update on BTS data programs and future plans; (5) Council Members review and discussion of BTS programs... Freiberg, 1200 New Jersey Avenue SE., Room E34-429, Washington, DC 20590, or faxed to (202) 366-3640. BTS...

  16. A Weighted Goal Programming model for planning sustainable development applied to Gulf Cooperation Council Countries

    International Nuclear Information System (INIS)

    Jayaraman, Raja; Colapinto, Cinzia; La Torre, Davide; Malik, Tufail

    2017-01-01

    Highlights: • Application of multi-criteria optimization model for sustainable development. • GHG emissions targets cannot be attainable due to reliance on hydrocarbon sources. • Provides quantitative evidence for future investments in green energy. • Application to Gulf Cooperation Countries. - Abstract: The United Nations agenda for sustainable development by the year 2030 proposes 17 sustainable development goals which include access to affordable, reliable and clean energy, sustained economic growth with full productive employment and, urgent action to mitigate environmental degradation. Planning for sustainable development requires integrating conflicting criteria on economy, energy, environment and social aspects. In this paper, we introduce a Weighted Goal Programming model involving criteria on the economic development (GDP), the electricity consumption, the greenhouse gas emissions, and the total number of employees to determine optimal labor allocation across various economic sectors. The proposed model is validated with data from the six members of the Gulf Cooperation Council (namely Bahrain, Kuwait, Oman, Qatar, Saudi Arabia and the United Arab Emirates). The results of the model aim to provide empirical evidence and insights to decision makers and policy analysts in developing optimal strategies able to simultaneously satisfy energy demand, economic growth, labor development and reduction in greenhouse gas emissions to achieve sustainability targets by the year 2030.

  17. An Introduction To Reliability

    International Nuclear Information System (INIS)

    Park, Kyoung Su

    1993-08-01

    This book introduces reliability with definition of reliability, requirement of reliability, system of life cycle and reliability, reliability and failure rate such as summary, reliability characteristic, chance failure, failure rate which changes over time, failure mode, replacement, reliability in engineering design, reliability test over assumption of failure rate, and drawing of reliability data, prediction of system reliability, conservation of system, failure such as summary and failure relay and analysis of system safety.

  18. 76 FR 16240 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits

    Science.gov (United States)

    2011-03-23

    ... identified by the Commission. \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... reliability of the interconnection by ensuring that the bulk electric system is assessed during the operations... responsibility for SOLs. Further, Bulk-Power System reliability practices assign responsibilities for analyzing...

  19. Control area readiness audit report of the Independent Electricity Market Operator (IMO)

    International Nuclear Information System (INIS)

    Gladish, L.A.; Campoli, G.; Le, Q.; Farrokhpay, S.; Kirby, B.; Penwell, C.; Weaver, S.; Vicini, D.; Wells, M.

    2004-01-01

    The Independent Electricity Market Operator (IMO) is a control area authority that is responsible for the safe and reliable operation of its portion of the bulk electric system in cooperation with neighbouring control areas. This audit by the North American Electric Reliability Council (NERC) reviewed the readiness of Ontario's IMO to meets its responsibilities as a control area operator. NERC recommended specific actions to correct the deficiencies that resulted in the blackout in southeastern Ontario and northeastern United States on August 14, 2003. Initiatives to strengthen compliance with existing standards were also suggested along with longer-term technical initiatives to prevent or mitigate the impacts of cascading blackouts in the future. The audit process included: a self-assessment questionnaire to the control area being audited; a questionnaire to neighbouring control areas; a questionnaire to the reliability coordinator and an on-site audit by a selected audit team. The following issues were reviewed: criteria and compliance, authority, responsibilities in the planning time frame, real time monitoring, system restoration, delegation of reliability coordinator functions, outage coordination, transmission and generation relaying, energy emergency plan, operating policy, line clearances, and nuclear power plant requirements. It was concluded that the IMO has the necessary plans, procedures, processes, tools and trained personnel to respond to emergency events. The audit did not find any major operational problems, but offered a few recommendations for improvement. tabs

  20. 75 FR 62109 - Gulf of Mexico Fishery Management Council (Council); Public Meetings

    Science.gov (United States)

    2010-10-07

    ... meetings. SUMMARY: The Gulf of Mexico Fishery Management Council (GMFMC) will convene public meetings... Embassy Suites Hotel, 4914 Constitution Ave., Baton Rouge, LA 70808. Council address: Gulf of Mexico... CONTACT: Dr. Stephen Bortone, Executive Director, Gulf of Mexico Fishery Management Council; telephone...

  1. 78 FR 12294 - Gulf of Mexico Fishery Management Council (Council); Public Meetings

    Science.gov (United States)

    2013-02-22

    ... meetings. SUMMARY: The Gulf of Mexico and South Atlantic Fishery Management Councils will convene a Science.... to 4 p.m. EST on Tuesday, March 12, 2013. ADDRESSES: The meeting will be held at the Gulf of Mexico.... Council address: Gulf of Mexico Fishery Management Council, 2203 North Lois Avenue, Suite 1100, Tampa, FL...

  2. ALARA Council: Sharing our resources and experiences to reduce doses at Commonwealth Edison Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rescek, F. [Commonwealth Edison Co., Downers Grove, IL (United States)

    1995-03-01

    Commonwealth Edison Company is an investor-owned utility company supplying electricity to over three million customers (eight million people) in Chicago and northern Illinois, USA. The company operates 16 generating stations which have the capacity to produce 22,522 megawatts of electricity. Six of these generating stations, containing 12 nuclear units, supply 51% of this capacity. The 12 nuclear units are comprised of four General Electric boiling water (BWR-3) reactors, two General Electric BWR-5 reactors, and six Westinghouse four-loop pressurized water reactors (PWR). In August 1993, Commonwealth Edison created an ALARA Council with the responsibility to provide leadership and guidance that results in an effective ALARA Culture within the Nuclear Operations Division. Unlike its predecessor, the Corporate ALARA Committee, the ALARA Council is designed to bring together senior managers from the six nuclear stations and corporate to create a collaborative effort to reduce occupational doses at Commonwealth Edison`s stations.

  3. Electrical Impedance Tomography Technology

    Data.gov (United States)

    National Aeronautics and Space Administration — The goal for the Electrical Impedance Tomography Technology (EITT) project is to develop a reliable portable, lightweight device providing two-dimensional...

  4. 75 FR 81971 - Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2010-12-29

    ... Pacific Fishery Management Council's (Council) Highly Migratory Species Management Team (HMSMT) will hold... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National...., Carlsbad, CA 92011; telephone: (760) 431-9440. Council address: Pacific Fishery Management Council, 7700 NE...

  5. 77 FR 74469 - Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2012-12-14

    ... Pacific Fishery Management Council's (Pacific Council) Groundfish Management Team (GMT) will hold a week... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National...) 634-2000. Council address: Pacific Fishery Management Council, 7700 NE Ambassador Place, Suite 101...

  6. 78 FR 45580 - Hispanic Council on Federal Employment

    Science.gov (United States)

    2013-07-29

    ... OFFICE OF PERSONNEL MANAGEMENT Hispanic Council on Federal Employment AGENCY: Office of Personnel Management. ACTION: Cancelling and re-scheduling of Council meetings. SUMMARY: The Hispanic Council on Federal Employment (Council) is cancelling the August 29, 2013 Council meeting and will hold its remaining...

  7. 78 FR 65010 - Hispanic Council on Federal Employment

    Science.gov (United States)

    2013-10-30

    ... OFFICE OF PERSONNEL MANAGEMENT Hispanic Council on Federal Employment AGENCY: Office of Personnel Management. ACTION: Cancelling and Re-Scheduling of Council Meetings. SUMMARY: The Hispanic Council on Federal Employment (Council) is cancelling the October 31, 2013 Council meeting and will hold its...

  8. 78 FR 12107 - Hispanic Council on Federal Employment

    Science.gov (United States)

    2013-02-21

    ... OFFICE OF PERSONNEL MANAGEMENT Hispanic Council on Federal Employment AGENCY: Office of Personnel Management. ACTION: Scheduling of Council Meetings. SUMMARY: The Hispanic Council on Federal Employment will hold its 2013 Council meetings on the dates and location shown below. The Council is an advisory...

  9. 77 FR 61626 - Sport Fishing and Boating Partnership Council

    Science.gov (United States)

    2012-10-10

    ...-FVWF97920900000-XXX] Sport Fishing and Boating Partnership Council AGENCY: Fish and Wildlife Service, Interior... meeting of the Sport Fishing and Boating Partnership Council (Council). A Federal advisory committee, the... Sport Fishing and Boating Partnership Council will hold a meeting. Background The Council was formed in...

  10. The Council of Psychological Advisers.

    Science.gov (United States)

    Sunstein, Cass R

    2016-01-01

    Findings in behavioral science, including psychology, have influenced policies and reforms in many nations. Choice architecture can affect outcomes even if material incentives are not involved. In some contexts, default rules, simplification, and social norms have had even larger effects than significant economic incentives. Psychological research is helping to inform initiatives in savings, finance, highway safety, consumer protection, energy, climate change, obesity, education, poverty, development, crime, corruption, health, and the environment. No nation has yet created a council of psychological advisers, but the role of behavioral research in policy domains is likely to grow in the coming years, especially in light of the mounting interest in promoting ease and simplification ("navigability"); in increasing effectiveness, economic growth, and competitiveness; and in providing low-cost, choice-preserving approaches.

  11. 75 FR 68010 - Federal Salary Council

    Science.gov (United States)

    2010-11-04

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Salary Council AGENCY: Office of Personnel Management. ACTION: Notice of meeting. SUMMARY: The Federal Salary Council will meet on November 19, 2010, at the... establishment or modification of locality pay areas, the coverage of salary surveys, the process of comparing...

  12. 77 FR 59026 - Federal Salary Council

    Science.gov (United States)

    2012-09-25

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Salary Council AGENCY: Office of Personnel Management. ACTION: Notice of meeting. SUMMARY: The Federal Salary Council will meet on October 19, 2012, at the time... establishment or modification of locality pay areas, the coverage of salary surveys, the process of comparing...

  13. 78 FR 61404 - Federal Salary Council; Meeting

    Science.gov (United States)

    2013-10-03

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Salary Council; Meeting AGENCY: Office of Personnel Management. ACTION: Notice of meeting. SUMMARY: The Federal Salary Council will meet on November 5, 2013, at... recommendations cover the establishment or modification of locality pay areas, the coverage of salary surveys, the...

  14. 78 FR 65717 - Federal Salary Council

    Science.gov (United States)

    2013-11-01

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Salary Council AGENCY: Office of Personnel Management. ACTION: Notice of meeting. SUMMARY: The Federal Salary Council meeting originally scheduled for November... establishment or modification of locality pay areas, the coverage of salary surveys, the process of comparing...

  15. 75 FR 63215 - Federal Salary Council Meeting

    Science.gov (United States)

    2010-10-14

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Salary Council Meeting AGENCY: Office of Personnel Management. ACTION: Notice of Meeting. SUMMARY: The Federal Salary Council will meet on October 29, 2010, at... recommendations cover the establishment or modification of locality pay areas, the coverage of salary surveys, the...

  16. 76 FR 59175 - Federal Salary Council; Meeting

    Science.gov (United States)

    2011-09-23

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Salary Council; Meeting AGENCY: Office of Personnel Management. ACTION: Notice of meeting. SUMMARY: The Federal Salary Council will meet on November 4, 2011, at... recommendations cover the establishment or modification of locality pay areas, the coverage of salary surveys, the...

  17. 78 FR 41804 - NASA Advisory Council; Meeting.

    Science.gov (United States)

    2013-07-11

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice: (13-077)] NASA Advisory Council; Meeting... Space Administration announces a meeting of the NASA Advisory Council (NAC). DATES: Wednesday, July 31... ADDRESSES: NASA Headquarters, Room 9H40, Program Review Center, 300 E Street SW., Washington, DC 20456 FOR...

  18. 75 FR 4588 - NASA Advisory Council; Meeting

    Science.gov (United States)

    2010-01-28

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 10-011] NASA Advisory Council; Meeting... Committee of the NASA Advisory Council. This will be the first meeting of this Committee. DATES: February 11, 2010--11 a.m.-1 p.m. (EST). Meet-Me-Number: 1-877-613-3958; 2939943. ADDRESSES: NASA Headquarters, 300...

  19. 76 FR 4133 - NASA Advisory Council; Meeting

    Science.gov (United States)

    2011-01-24

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice: (11-007)] NASA Advisory Council; Meeting... Space Administration announces a meeting of the NASA Advisory Council. DATES: Thursday, February 10, 2011, 8 a.m.-5 p.m., Local Time. Friday, February 11, 2011, 8 a.m.-12 p.m., Local Time. ADDRESSES: NASA...

  20. 75 FR 5629 - NASA Advisory Council; Meeting

    Science.gov (United States)

    2010-02-03

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice (10-019)] NASA Advisory Council; Meeting... Space Administration announces a meeting of the NASA Advisory Council. DATES: Thursday, February 18, 2010, 9 a.m.-5 p.m. EST; Friday, February 19, 2010, 9 a.m.-1 p.m., EST. ADDRESSES: NASA Headquarters...

  1. 77 FR 9997 - NASA Advisory Council; Meeting

    Science.gov (United States)

    2012-02-21

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice (12-016)] NASA Advisory Council; Meeting... Space Administration announces a meeting of the NASA Advisory Council (NAC). DATES: Thursday, March 8, 2012, 8 a.m.-5 p.m., local time and Friday, March 9, 2012, 8 a.m.-12 p.m., local time. ADDRESSES: NASA...

  2. 75 FR 59747 - NASA Advisory Council; Meeting.

    Science.gov (United States)

    2010-09-28

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice: (10-113)] NASA Advisory Council; Meeting. AGENCY: National Aeronautics and Space Administration. ACTION: Notice of meeting. SUMMARY: In accordance... Space Administration announces a meeting of the NASA Advisory Council. DATES: Wednesday, October 6, 2010...

  3. 75 FR 4875 - NASA Advisory Council; Meeting

    Science.gov (United States)

    2010-01-29

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice (10-015)] NASA Advisory Council; Meeting... the NASA Advisory Council. This will be the first meeting of this Committee. DATES: February 17, 2010--10 a.m.-4 p.m. (EST). ADDRESSES: NASA Headquarters, 300 E Street, SW., Washington, DC, Room CD61. FOR...

  4. Coordinating Council. Ninth Meeting: Total Quality Management

    Science.gov (United States)

    1992-01-01

    This report summarizes the 9th meeting of the STI Coordinating Council. The council listened to the speakers' understanding of Total Quality Management (TQM) principles and heard stories of successful applications of these principles. Definitions of quality stated were focused on customer satisfaction. Reports presented by the speakers are also included.

  5. 7 CFR 1230.6 - Council.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Council. 1230.6 Section 1230.6 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... CONSUMER INFORMATION Pork Promotion, Research, and Consumer Information Order Definitions § 1230.6 Council...

  6. 76 FR 37873 - National Women's Business Council

    Science.gov (United States)

    2011-06-28

    ... SMALL BUSINESS ADMINISTRATION National Women's Business Council AGENCY: U.S. Small Business... National Women's Business Council (NWBC). The meeting will be open to the public. DATE: The meeting will be... p.m. EST. ADDRESSES: The meeting will be held at the U. S. Small Business Administration Building...

  7. 76 FR 21786 - National Women's Business Council

    Science.gov (United States)

    2011-04-18

    ... SMALL BUSINESS ADMINISTRATION National Women's Business Council AGENCY: U.S. Small Business... Business Council (NWBC). The meeting will be open to the public. DATES: The meeting will be held on April... Russell Senate Office Building (U.S. Senate Committee on Small Business and Entrepreneurship), Washington...

  8. 78 FR 7757 - Council Coordination Committee Meeting

    Science.gov (United States)

    2013-02-04

    ... issues of relevance to the Councils, including FY 2013 budget allocations and budget planning for FY 2014... will be held at the Sheraton Silver Spring Hotel, 8777 Georgia Avenue, Silver Spring, MD 20001... reports (continued) 11:15-12:15--Management and Budget Update FY2012: Status, Council funding FY2013...

  9. 75 FR 81232 - Council Coordination Committee Meeting

    Science.gov (United States)

    2010-12-27

    ... issues of relevance to the Councils, including FY 2011 budget allocations and budget planning, Annual... be held at the Phoenix Park Hotel, 520 North Capitol Street, NW., Washington, DC 20001, telephone 1...:30-2:15 Performance Measures. 2:15-3:15 Budget Issues FY11: Status, Allocation, Council Grants. FY12...

  10. Health council report 'Antimicrobial growth promoters'.

    NARCIS (Netherlands)

    Goettsch, W; Degener, JE

    1999-01-01

    The Health Council of the Netherlands has issued a report on the risk of development of resistance among bacteria as result of the use of antibiotics as growth promotors in livestock farming. The committee appointed by the Health Council conclude that the use of antimicrobial growth promotors

  11. 77 FR 29321 - National Coal Council

    Science.gov (United States)

    2012-05-17

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the National Coal Council (NCC). The Federal Advisory...., Washington, DC 20585-1290; Telephone: 202-586-0429. SUPPLEMENTARY INFORMATION: Purpose of Meeting: The Coal...

  12. 76 FR 9765 - National Coal Council

    Science.gov (United States)

    2011-02-22

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the National Coal Council (NCC). The Federal Advisory... Chairman Joe Hopf. Presentation by Coal Policy Committee Chairman Frank Blake on the findings and...

  13. 77 FR 2714 - National Petroleum Council

    Science.gov (United States)

    2012-01-19

    ... DEPARTMENT OF ENERGY National Petroleum Council AGENCY: Office of Fossil Energy, Department of Energy. ACTION: Notice of Renewal. SUMMARY: Pursuant to Section 14(a)(2)(A) of the Federal Advisory... Services Administration, notice is hereby given that the National Petroleum Council has been renewed for a...

  14. 75 FR 48320 - National Petroleum Council

    Science.gov (United States)

    2010-08-10

    ... DEPARTMENT OF ENERGY National Petroleum Council AGENCY: Department of Energy, Office of Fossil Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the National Petroleum Council. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public...

  15. Reliability of power system with open access

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A. M.; Fotuhi Firuzabad, M.; Ehsani, M.

    2003-01-01

    Recently, in many countries, electric utility industry is undergoing considerable changes in regard to its structure and regulation. It can be clearly seen that the thrust towards privatization and deregulation or re regulation of the electric utility industry will introduce numerous reliability problems that will require new criteria and analytical tools that recognize the residual uncertainties in the new environment. In this paper, different risks and uncertainties in competitive electricity markets are briefly introduced; the approach of customers, operators, planners, generation bodies and network providers to the reliability of deregulated system is studied; the impact of dispersed generation on system reliability is evaluated; and finally, the reliability cost/reliability worth issues in the new competitive environment are considered

  16. 18 CFR 292.308 - Standards for operating reliability.

    Science.gov (United States)

    2010-04-01

    ... reliability. 292.308 Section 292.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying... may establish reasonable standards to ensure system safety and reliability of interconnected...

  17. 18 CFR 40.3 - Availability of Reliability Standards.

    Science.gov (United States)

    2010-04-01

    ... Reliability Standards. 40.3 Section 40.3 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT MANDATORY RELIABILITY STANDARDS FOR THE BULK-POWER SYSTEM § 40.3 Availability of Reliability Standards. The Electric Reliability...

  18. 78 FR 27113 - Version 5 Critical Infrastructure Protection Reliability Standards

    Science.gov (United States)

    2013-05-09

    ... approve certain reliability standards proposed by the North American Electric Reliability Corporation... Infrastructure Protection Reliability Standards, 143 FERC ] 61,055 (2013). This errata notice serves to correct P... Commission 18 CFR Part 40 [Docket No. RM13-5-000] Version 5 Critical Infrastructure Protection Reliability...

  19. Steam generator reliability improvement project

    International Nuclear Information System (INIS)

    Blomgren, J.C.; Green, S.J.

    1987-01-01

    Upon successful completion of its research and development technology transfer program, the Electric Power Research Institute's Steam Generator Owners Group (SGOG II) will disband in December 1986 and be replaced in January 1987 by a successor project, the Steam Generator Reliability Project (SGRP). The new project, funded in the EPRI base program, will continue the emphasis on reliability and life extension that was carried forward by SGOG II. The objectives of SGOG II have been met. Causes and remedies have been identified for tubing corrosion problems, such as stress corrosion cracking and pitting, and steam generator technology has been improved in areas such as tube wear prediction and nondestructive evaluation (NDE). These actions have led to improved reliability of steam generators. Now the owners want to continue with a centrally managed program that builds on what has been learned. The goal is to continue to improve steam generator reliability and solve small problems before they become large problems

  20. Steam generator reliability improvement project

    International Nuclear Information System (INIS)

    Blomgren, J.C.; Green, S.J.

    1987-01-01

    Upon successful completion of its research and development technology transfer program, the Electric Power Research Institute's (EPRI's) Steam Generator Owners Group (SGOG II) will disband in December 1986, and be replaced in January 1987, by a successor project, the Steam Generator Reliability Project (SGRP). The new project, funded in the EPRI base program, will continue to emphasize reliability and life extension, which were carried forward by SGOG II. The objectives of SGOG II have been met. Causes and remedies have been identified for tubing corrosion problems such as stress corrosion cracking and pitting, and steam generator technology has been improved in areas such as tube wear prediction and nondestructive evaluation. These actions have led to improved reliability of steam generators. Now the owners want to continue with a centrally managed program that builds on what has been learned. The goal is to continue to improve steam generator reliability and to solve small problems before they become large problems