  1. Critical success factors for BOT electric power projects in China: Thermal power versus wind power

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, Zhen-Yu. [School of Business Administration, North China Electric Power University, Beijing 102206 (China); Zuo, Jian; Zillante, George [School of Natural and Built Environments, University of South Australia, Adelaide 5001 (Australia); Wang, Xin-Wei [Shandong Nuclear Power Equipment Manufacturing Co. Ltd, Haiyang, Shandong 265118 (China)

    2010-06-15

    Chinese electric power industry has adopted Build-Operate-Transfer (BOT) approach in a number of projects to alleviate the pressure of sole state-owned investment. The Chinese government has taken enormous efforts to create an environment to facilitate the application of BOT approach in electric power projects. Moreover, the growing attention on the sustainability issues puts the traditional major source of electricity - thermal power project under more strict scrutiny. As a result, various renewable energy projects, particularly the wind power projects have involved private sector funds. Both thermal power and wind power projects via BOT approach have met with a varying degree of success. Therefore, it is imperative to understand the factors contributing towards the success of both types of BOT power projects. Using an extensive literature survey, this paper identifies 31 success factors under 5 categories for Chinese BOT electric power projects. This is followed by a questionnaire survey to exam relative significance of these factors. The results reveal the different levels of significance of success factors for BOT thermal power projects versus wind power projects. Finally, survey results were analyzed to explore the underlying construction and distributions among the identified success factors. This study provides a valuable reference for all involved parties that are interested in developing BOT electric power projects in China. (author)

  2. TEP Power Partners Project [Tucson Electric Power

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-02-06

    The Arizona Governor’s Office of Energy Policy, in partnership with Tucson Electric Power (TEP), Tendril, and Next Phase Energy (NPE), formed the TEP Power Partners pilot project to demonstrate how residential customers could access their energy usage data and third party applications using data obtained from an Automatic Meter Reading (AMR) network. The project applied for and was awarded a Smart Grid Data Access grant through the U.S. Department of Energy. The project participants’ goal for Phase I is to actively engage 1,700 residential customers to demonstrate sustained participation, reduction in energy usage (kWh) and cost ($), and measure related aspects of customer satisfaction. This Demonstration report presents a summary of the findings, effectiveness, and customer satisfaction with the 15-month TEP Power Partners pilot project. The objective of the program is to provide residential customers with energy consumption data from AMR metering and empower these participants to better manage their electricity use. The pilot recruitment goals included migrating 700 existing customers from the completed Power Partners Demand Response Load Control Project (DRLC), and enrolling 1,000 new participants. Upon conclusion of the project on November 19, 2013; 1,390 Home Area Networks (HANs) were registered; 797 new participants installed a HAN; Survey respondents’ are satisfied with the program and found value with a variety of specific program components; Survey respondents report feeling greater control over their energy usage and report taking energy savings actions in their homes after participating in the program; On average, 43 % of the participants returned to the web portal monthly and 15% returned weekly; and An impact evaluation was completed by Opinion Dynamics and found average participant savings for the treatment period1 to be 2.3% of their household use during this period.2 In total, the program saved 163 MWh in the treatment period of 2013.

  3. Appraisal and financing of electric power projects

    International Nuclear Information System (INIS)

    Sheehan, R.H.

    1975-01-01

    This paper starts with the origin, nature and functions of the World Bank Group, reviews the past lending, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a look at the probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  4. Assessment and financing of electric power projects

    International Nuclear Information System (INIS)

    Moscote, R.A.

    1976-01-01

    The aim of the appraisal of a project is to examine the economic need which a project is designed to meet, to judge whether the project is likely to meet this need in an efficient way, and to conclude what conditions should be attached to eventual Bank financing. Bank involvement continues throughout the life of the project helping to ensure that each project is carried out at the least possible cost and that it makes the expected contribution to the country's development. This paper gives an idea about the origin, nature and functions of the World Bank Group, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a review of past lending and probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  5. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    International Nuclear Information System (INIS)

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  6. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  7. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  8. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  9. Electric power production contra electricity savings

    International Nuclear Information System (INIS)

    Schleisner, L.; Grohnheit, P.E.; Soerensen, H.

    1991-01-01

    The expansion of electricity-producing plants has, in Denmark until now, taken place in accordance with the demand for electricity. Recently, it has been suggested that the cost of the further development of such systems is greater than the cost of instigating and carrying out energy conservation efforts. The aim of the project was to evaluate the consequences for power producing plants of a reduction of the electricity consumption of end-users. A method for the analysis of the costs involved in the system and operation of power plants contra the costs that are involved in saving electricity is presented. In developing a model of this kind, consideration is given to the interplay of the individual saving project and the existing or future electricity supply. Thus it can be evaluated to what extent it would be advisable to substitute investments in the development of the capacity of the power plants with investments in the reduction of electricity consumption by the end users. This model is described in considerable detail. It will be tested in representative situations and locations throughout the Nordic countries. (AB) 17 refs

  10. Technical and Economic Evaluation of «Electric House» Project: Investigation of Possibility to Use Electric Power as Single Energy Carrier in Residential Buildings

    OpenAIRE

    M. M. Oleshkevich; Y. V. Makosko

    2011-01-01

    The paper considers special features of the «Electric House» project where the building is provided with electric power, cold water and sewerage system. The «Electric House» is characterized by ecological cleanness, high reliability in power supply and low capital costs. While running the «Electric House» an annual expenditure of equivalent fuel is increased due to low efficiency of electric power generation at power plants. The profit obtained due to «Electric House» construction is depleted...

  11. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  12. Fourteenth electric power survey of India

    International Nuclear Information System (INIS)

    1991-03-01

    Fourteenth Electric Power Supply Committee was set up by the Government of India in February 1989 to review the demand projections for electric power, in detail, keeping in view the Eight Plan proposals and to project the perspective demand for (electric) power upto the year 2009-10. Partial End-use method was adopted for forecasting the power demands over a short term period. For estimating the power requirements on a long-term basis, the trend in overall requirements in a state system formed the basis of projections. The long term forecast covering the period 1995-96 to 2009-10 was made by extrapolating the overall requirement of electricity for various states and Union Territories with 1994-95 as the base year. The data were collected from various State Electricity Boards, Public utilities, concerned departments of State Governments and various Ministries and Departments of the Government of India and were computerised. The data base was used to develop a number of scenarios and to make projections. (M.G.B.)

  13. Recent experiences with independent power projects

    International Nuclear Information System (INIS)

    Kline, R.H.; Fitzowitch, J.R.; Dalla-Longa, L.

    1999-01-01

    New opportunities are making it possible to develop independent power projects involving partnerships with the electric power industry, and the petroleum and natural gas industry . This paper described those opportunities, the impediments and the risks involved. Mercury Electric Corp. has been involved in power projects at remote gas field and oil field sites where they use of a turbogenerator which runs on flare gas to generate electricity. TransCanada Power's involvement in independent power projects includes the supply and transport of gas and their ability to provide gas fired combined cycle technology. They are involved in a project at Hermiston, Oregon and also in a cogeneration project in Medicine Hat, Alberta. The CanCarb City of Medicine Hat project makes use of waste heat at an industrial facility. 11 figs

  14. A combined hydro-nuclear-solar project for electric power production

    International Nuclear Information System (INIS)

    Yiftah, S.

    1985-01-01

    Some of the main, general-perspective themes of Dr. Alvin Weinberg's leadership and long and varied work are: the effect of present and future nuclear energy projects on society, not only in the United States but throughout the world; analysis, comparison, and combination of various sources of energy; extensive multiple use of nuclear energy complexes (so-called NUPLEX, for nuclear complex) for various areas of the world; and use of ''Big Technology'' and ''Big Science'' for solving, or helping to solve, political problems. A combined hydro-nuclear-solar project for electric power production is discussed, as well as two other energy-related engineering projects. Some of the projects originated or were inspired by work done at the Oak Ridge National Laboratory under the leadership of Dr. Alvin Weinberg. Also reported are the technical characteristics and interrelationships of the three components of the envisaged hydronuclear-solar project

  15. Electric power annual, 1990

    International Nuclear Information System (INIS)

    1992-01-01

    The Electric Power Annual presents a summary of electric utility statistics at the national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policy-makers, analysts and the general public with historical data that may be used in understanding US electricity markets. ''The Industry at a Glance'' section presents a profile of the electric power industry ownership and performance; a review of key statistics for the year; and projections for various aspects of the electric power industry through 2010. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; and electric power transactions. In addition, appendices provide supplemental data on major disturbances and unusual occurrences. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter

  16. Miniaturized Power Processing Unit Study: A Cubesat Electric Propulsion Technology Enabler Project

    Science.gov (United States)

    Ghassemieh, Shakib M.

    2014-01-01

    This study evaluates High Voltage Power Processing Unit (PPU) technology and driving requirements necessary to enable the Microfluidic Electric Propulsion technology research and development by NASA and university partners. This study provides an overview of the state of the art PPU technology with recommendations for technology demonstration projects and missions for NASA to pursue.

  17. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  18. Power Sales to Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    1989-02-01

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of

  19. Great expectations. Projections of nuclear power around the world

    International Nuclear Information System (INIS)

    McDonald, Alan; Rogner, Hans-Holger; Gritsevskyi, Andrii

    2009-01-01

    In its 2008 edition of Energy, Electricity and Nuclear Power Estimates for the Period to 2030, the International Atomic Energy Agency (IAEA) has again revised its projections for nuclear power upwards. Every year since 1981 the IAEA has published 2 updated projections for the world's nuclear power generating capacity, a low projection and a high projection. The low projection is a down to earth, business-as-usual projection. The high projection takes into account government and corporate announcements about longer-term plans for nuclear investments as well as potential new national policies, e.g., to combat climate change. The results for the 2008 projections are presented. In the low projection, the projected nuclear power capacity in 2030 is 473 GW(e), some 27% higher than today's 372 GW(e). In the high projection, nuclear capacity in 2030 is 748 GW(e), double today's capacity. But while projections for nuclear power's future rose, its share of the world's electricity generation today dropped from 15% in 2006 to 14% in 2007. The main reason is that while total global electricity generation rose 4.8% from 2007 to 2008, nuclear electricity actually dropped slightly. The overall message from the IAEA's 2008 edition of Energy, Electricity and Nuclear Power Estimates for the Period to 2030 is that global electricity use will grow significantly, that nuclear power will have to expand more rapidly than it has done recently in order to maintain its share, and that nuclear power can meet the challenge. (orig.)

  20. Wave Power Demonstration Project at Reedsport, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    Mekhiche, Mike [Principal Investigator; Downie, Bruce [Project Manager

    2013-10-21

    Ocean wave power can be a significant source of large‐scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high‐voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon‐based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take‐off subsystem are complete; additionally the power take‐off subsystem has been successfully integrated into the spar.

  1. Energy, electricity and nuclear power: Developments and projections - 25 years past and future

    International Nuclear Information System (INIS)

    2007-12-01

    This report is based on the annual IAEA publication, Energy, Electricity and Nuclear Power Estimates for the Period up to 2030, Reference Data Series No. 1 (RDS-1). The IAEA has been publishing RDS-1 since 1981. It reports on the current status and estimates of energy use, electricity generation and nuclear power generation in various regions of the world for the medium to long term. The estimates are prepared in close collaboration and consultation with several international, regional and national organizations dealing with energy related statistics, such as the United Nations Department of Economic Affairs, the International Energy Agency (IEA), the OECD Nuclear Energy Agency (OECD/NEA), the World Bank, the World Nuclear Agency (WNA), the US Department of Energy (DOE) and the French Atomic Energy Commission (CEA), as well as several international energy experts. The latest issue is the 27th edition, reporting estimates for the next 24 years using 2006 as the base year. During its 26 years of regular publication, several adjustments were made to the definitions and methodology for compiling the energy data, in order to improve the quality of the data. These adjustments were in line with the overall efforts at the international level to harmonize energy statistics. For example, the United Nations Statistical Commission has been making efforts to synchronize its data series under various programmes. For RDS-1, one such adjustment was made in 2005 when the average thermal efficiency method was adopted to convert electricity produced by nuclear power plants from kilowatt-hours to joules. This had a significant impact on the values of total energy use. At this stage, the entire historical data series was also adjusted. This report provides these harmonized data series on energy use, electricity generation and nuclear power generation for the 25 year period (1980-2005). The report also compares the nuclear power projections made in the past with the projections made in

  2. A centennial book of Korea electric power corporation

    International Nuclear Information System (INIS)

    1989-12-01

    This book gives description of KEPC with power and life such as lighting, electric power, electric heat and communication, introduction of electric civilization, establishment and manage of Hansung electric company on opening of electric train, regulation of the train, opening of lamp business, construction of Yongsan generator, the Japanese invasion with trouble of supplying electricity, control over power business and development of water power generation, division of Korea and Korea war on damage out of Korea war and rebuild, development and growth on establishment of Korea electric power, establishment of Korea electric power by private and water power development project, stability and development, and challenge for future.

  3. Electricity for road transport, flexible power systems and wind power

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Lars Henrik; Ravn, H.; Meibom, P. (and others)

    2011-12-15

    The aim of the project is to analyse the potential synergistic interplay that may arise between the power sector and the transport sector, if parts of the road transport energy needs are based on electricity via the utilisation of plug-in hybrid electric vehicles and pure electric vehicles. The project focuses on the technical elements in the chain that comprises: 1: The electric vehicle status, potentials and expected development. Electric batteries are in focus in this part of the analysis. 2: Analysis of plug-in hybrid electric vehicle interacting with a local grid. 3: Analysis of grid-vehicle connection systems including technical regulation options and analysis of needs for standardisation. 4: Setting up scenarios covering potential developments for utilizing electric drive trains in road transport. Period: Up to year 2030. 5: Analysis of capacity constraints in the electricity grid (transmission and distribution) as consequence of increasing electricity demand, and new flexible consumption patterns from segments in the transport sector, and as consequence of increasing capacity on wind power in the system. 6: Setting up and analysis of combined scenarios covering both the heat and power system and the transport sector. (Author)

  4. 2015 Plan. Project 2: the electric power sector and the Brazilian economy: insertion and forecasts

    International Nuclear Information System (INIS)

    1993-05-01

    This project shows the economic and the energetic view of the Brazilian electric power sector, mentioning the actual conjuncture; the economy evolution; some sector forecasts; demographical aspects; international price of petroleum and National Energetic Matrix. (C.G.C.)

  5. Advance of technological innovations of electric power in 2012

    International Nuclear Information System (INIS)

    Mayumi, Akihiko; Tanaka, Masanori; Takebe, Toshiro

    2013-01-01

    Twelve companies in Japan reported on the technological innovations in 2012. The Japan Atomic Power Company mainly studied five projects; (1) control of wall thinning of the secondary system in PWR by injection of molybdic acid, (2) application of pipe test method using electromagnetic acoustic resonance to existing equipment, (3) developed high performance Co-60 crud removal resin for Tsuruga Power Station Unit 2, (4) improvement of technology for safety of core in FBR, and (5) improvement of technology for coolant of FBR by dispersing nano-particles in liquid sodium metal. Tokyo Electric Power Company developed mainly three projects; (1) the support for the mental health care activities by industry protection staff at the Fukushima Daiichi and Daini Nuclear Power Plant, (2) laboratory test method using non-radioactive cesium for performance of decontamination reagent, and (3) decontamination effects estimation code (DeConEP). Hokuriku Electric Power Company reported the operations management measures in accordance with the safety enhancement measures to Shika nuclear power station. Other nine reports are published by Hokkaido Electric Power Co., Inc. Tohoku Electric Power Co., Inc. Chubu Electric Power Co., Inc., The Kansai Electric Power Co., Inc., The Chugoku Electric Power Co., Inc., Shikoku Electric Power Co., Inc., Kyushu Electric Power Co., Inc., Okinawa Electric Power Company Inc. and J-Power. (S.Y.)

  6. Overview of US heavy-ion fusion commercial electric power systems assessment project. Revision

    International Nuclear Information System (INIS)

    Dudziak, D.J.; Pendergrass, J.H.; Saylor, W.W.

    1986-01-01

    The US heavy-ion fusion (HIF) research program is oriented toward development of multiple-beam induction linacs. Over the last two years an assessment has been performed of the potential of HIF as a competitive commercial electric power source. This assessment involved several technology performance and cost issues (e.g., final beam transport system, target manufacturing, beam stability in reactor cavity environments, and reactor cavity clearing), as well as overall power plant systems integration and tradeoff studies. Results from parametric analyses using a systems code developed in the project show cost of electricity (COE) values comparable with COEs from other magnetic fusion and inertial confinement fusion (ICF) plant studies; viz, 50-60 mills/kWh (1985 dollars) for 1-GWe plants. Also, significant COE insensitivity to major accelerator, target, and reactor parameters was demonstrated

  7. Electricity for Road Transport, Flexible Power Systems and Wind Power

    DEFF Research Database (Denmark)

    Nielsen, Lars Henrik; Ravn, Hans; Meibom, Peter

    The aim of the project is to analyse the potential synergistic interplay that may arise between the power sector and the transport sector, if parts of the road transport energy needs are based on electricity via the utilisation of plug-in hybrid electric vehicles and pure electric vehicles....... The project focuses on the technical elements in the chain that comprises: 1: The electric vehicle status, potentials and expected development. Electric batteries are in focus in this part of the analysis. 2: Analysis of plug-in hybrid electric vehicle interacting with a local grid. 3: Analysis of grid-vehicle...

  8. Meeting the Pacific Rim's changing electric power needs

    International Nuclear Information System (INIS)

    Hammons, T.J.

    1994-01-01

    This article describes the presentations made at the 1994 Asian Electric Conference. The topics discussed in detail include a successfully implemented strategy for building power projects, a review of the reforms taking place as Australia moves toward a competitive national electricity market by July 1995, the reorganizing of Japan's electric power market, and the electricity reform program in Pakistan

  9. Electric power. Enron establishes in Italy

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The US Enron group and the Italian Enel group have decided to create a joint-venture for the production of electric power in Italy. Their activities will be based on the transformation of existing classical thermal power plants into natural gas fueled combined cycle power plants. The total capacity of the converted power plants will be of 5000 MW. Enron should invest about 3 billions of US Dollars in this project and will be in a privileged position when the Italian electric power market will be open to competition in 1999. Short paper. (J.S.)

  10. Electric power grid interconnection in Northeast Asia

    International Nuclear Information System (INIS)

    Yun, Won-Cheol; Zhang, Zhong Xiang

    2006-01-01

    In spite of regional closeness, energy cooperation in Northeast Asia has remained unexplored. However, this situation appears to be changing. The government of South Korea seems to be very enthusiastic for power grid interconnection between the Russian Far East and South Korea to overcome difficulties in finding new sites for building power facilities to meet its need for increased electricity supplies. This paper analyzes the feasibility of this electric power grid interconnection route. The issues addressed include electricity market structures; the prospects for electric power industry restructuring in the Russian Federation and South Korea; the political issues related to North Korea; the challenges for the governments involved and the obstacles anticipated in moving this project forward; project financing and the roles and concerns from multilateral and regional banks; and institutional framework for energy cooperation. While there are many technical issues that need to be resolved, we think that the great challenge lies in the financing of this commercial project. Thus, the governments of the Russian Federation and South Korea involved in the project need to foster the development of their internal capital markets and to create confidence with international investors. To this end, on energy side, this involves defining a clear energy policy implemented by independent regulators, speeding up the already started but delayed reform process of restructuring electric power industry and markets, and establishing a fair and transparent dispute resolution mechanism in order to reduce non-commercial risks to a minimum. The paper argues that establishing a framework for energy cooperation in this region will contribute positively towards that end, although views differ regarding its specific form. Finally, given that North Korea has a crucial transit role to play and faces a very unstable political situation, it is concluded that moving the project forward needs to be

  11. Decision support for choice optimal power generation projects: Fuzzy comprehensive evaluation model based on the electricity market

    International Nuclear Information System (INIS)

    Liang Zhihong; Yang Kun; Sun Yaowei; Yuan Jiahai; Zhang Hongwei; Zhang Zhizheng

    2006-01-01

    In 2002, China began to inspire restructuring of the electric power sector to improve its performance. Especially, with the rapid increase of electricity demand in China, there is a need for non-utility generation investment that cannot be met by government finance alone. However, a first prerequisite is that regulators and decision-makers (DMs) should carefully consider how to balance the need to attract private investment against the policy objectives of minimizing monopoly power and fostering competitive markets. So in the interim term of electricity market, a decentralized decision-making process should eventually replace the centralized generation capacity expansion planning. In this paper, firstly, on the basis of the current situation, a model for evaluating generation projects by comprehensive utilization of fuzzy appraisal and analytic hierarchy process (AHP) is developed. Secondly, a case study of generation project evaluation in China is presented to illustrate the effectiveness of the model in selecting optimal generation projects and attracting private investors. In the case study, with considerations of attracting adequate private investment and promoting energy conservation in China, five most promising policy instruments selected as evaluation factors include project duration, project costs, predicted on-grid price level, environmental protection, enterprise credit grading and performance. Finally, a comprehensive framework that enables the DM to have better concentration and to make more sound decisions by combining the model proposed with modern computer science is designed

  12. 25 CFR 169.27 - Power projects.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Power projects. 169.27 Section 169.27 Indians BUREAU OF... projects. (a) The Act of March 4, 1911 (36 Stat. 1253), as amended by the Act of May 27, 1952 (66 Stat. 95... on any project for the generation of electric power, or the transmission or distribution of...

  13. Solar thermal power systems point-focusing thermal and electric applications projects. Volume 1: Executive summary

    Science.gov (United States)

    Marriott, A.

    1980-01-01

    The activities of the Point-Focusing Thermal and Electric Applications (PETEA) project for the fiscal year 1979 are summarized. The main thrust of the PFTEA Project, the small community solar thermal power experiment, was completed. Concept definition studies included a small central receiver approach, a point-focusing distributed receiver system with central power generation, and a point-focusing distributed receiver concept with distributed power generation. The first experiment in the Isolated Application Series was initiated. Planning for the third engineering experiment series, which addresses the industrial market sector, was also initiated. In addition to the experiment-related activities, several contracts to industry were let and studies were conducted to explore the market potential for point-focusing distributed receiver (PFDR) systems. System analysis studies were completed that looked at PFDR technology relative to other small power system technology candidates for the utility market sector.

  14. Electric power annual 1989. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-17

    This publication presents a summary of electric utility statistics at the national, regional and state levels. The Industry At A Glance'' section presents a profile of the electric power industry ownership and performance; a review of key statistics for the year; and projections for various aspects of the electric power industry through 2010. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue and average revenue per kilowatthour sold; financial statistics; environmental statistics; and electric power transactions. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. 24 figs., 57 tabs.

  15. New nuclear power plants and the electricity market competition

    International Nuclear Information System (INIS)

    Ruska, M.; Koreneff, G.

    2009-11-01

    The study assesses the effects the different nuclear power plant projects would have on crossownership, market concentration and market power in electricity market. The analyses are given both for Finnish and Nordic power markets. The authors feel that the electricity market should primarily be viewed as a common Nordic market in the future. During 2000 to 2008 the hours when Finland was an own price area ranged from 1 % to 29 % as annual averages. In the future it will be more and more seldom that Finland will become an own deficit price area, because the cross-border transmission capacity to Sweden will increase as will Finnish electricity production capacity. In addition, the extension of Nord Pool to the Baltic will increase the size of the market. The ownership of power plants is typically organized through power share companies in Finland. Two of the three nuclear power plant projects are joint ventures with several electricity producers and consumers. The current ownership relations and what effects the new projects might have on them were analyzed in this study. The competitiveness of different electricity production forms in the future was assessed using different market scenarios based on varying demand expectations. The capacity structure was assumed to stay quite unchanged, where the biggest change is expected to come from new renewable power capacity due to EU targets. Conventional condensing power production will decrease and Nordic electricity exports will increase in the future. The market concentration would increase in Finland with new nuclear plants, the most if Fortum were the builder. Vattenfall has a decidedly larger electricity production in the Nordic countries than Fortum, and Vattenfall's capacity would be unchanged by the new planned nuclear plants. The nuclear power plant projects do not therefore increase market concentration significantly on a Nordic level. Nuclear power is not used for day or hour regulation in Finland, which means

  16. The solar two power tower project

    International Nuclear Information System (INIS)

    Chavez, J.M.; Klimas, P.C.; Laquil, P. de III; Skowronski, M.

    1993-01-01

    A consortium of United States utility concerns led by Southern California Edison Company (SCE) has begun a cooperative project with the U.S. Department of Energy (DOE) and industry to convert the 10-MWe Solar One Tower Pilot Plant to molten nitrate salt technology. Successful operation of the convert plant to be called Solar Two, will reduce the economic risks in building the initial commercial power tower projects and accelerate the commercial acceptance of this promising renewable energy technology. In a molten salt power tower plant, sunlight is concentrated by a field of sun-tracking mirrors, called heliostats, onto a centrally located receiver, atop a tower. Molten salt is heated in the receiver and stored until it is needed to generate steam to power a conventional turbine generator. Joining the SCE and DOE in sponsoring in sponsoring this project are the following organizations: Los Alamos department of Water Power, Idaho Power Company, PacifiCorp, Pacific Gas and Electric Company, Sacramento Municipal Utility District, Arizona Public Service Company, Salt River Project, City of Pasadena, California Energy Commission, Electric Power Research Institute, South Coast Air Quality Commission, Electric Power research Institute, South Coast Air Quality Management District, and Bechtel Corporation. The Solar Two project will convert the Solar One heat transfer system from a water/steam type to molten nitrate salt by replacing the water/steam receiver and oil/rock thermal storage system with a nitrate salt receiver, salt thermal storage, and steam generator. The estimate cost of Solar Two, including 3-year test period, is 48.5 millions. The plant will be on line in early 1995. (authors)

  17. A comparison of electric vehicle integration projects

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Garcia-Valle, Rodrigo; Kempton, Willett

    2012-01-01

    .g. utilization of electric vehicles for ancillary services. To arrive at standardized solutions, it is helpful to analyze the market integration and utilization concepts, architectures and technologies used in a set of state-of-the art electric vehicle demonstration projects. The goal of this paper......It is widely agreed that an intelligent integration of electric vehicles can yield benefits for electric vehicle owner, power grid, and the society as a whole. Numerous electric vehicle utilization concepts have been investigated ranging from the simple e.g. delayed charging to the more advanced e...... is to highlight different approaches to electric vehicle integration in three such projects and describe the underlying technical components which should be harmonized to support interoperability and a broad set of utilization concepts. The projects investigated are the American University of Delaware's V2G...

  18. Investments and price formation in a liberalized electric power market. Appendices

    International Nuclear Information System (INIS)

    Morthorst, P.E.

    2005-06-01

    How will the electric power prices in the Nordic electric power market develop if the generation capacity in the coming 10 to 15 years is increased considerably? And what are the conditions for investors to initiate new investments in power plants? Briefly speaking - these are the issues for the project that is reported in this report. The basis for the project has been the Nordic electric power market model and its capability to handle the future extension of the necessary generating capacity. The main issue in the project has been a quantitative analysis of what the prices in the Nordic electric power market will be in the future, depending on the size of new investments in the power generating capacity. The appendix volume of the project report contains detailed descriptions of the three models that are used: the Balmorel model, the investment model, and the MARS model. The Balmorel model is a partial equilibrium model that describes a coherent, international electric power system and combined heat and power system. The model was developed in 2000 through international co-operation with the aim to have a model for analysing international aspects in the Baltic area. The investment model analyses and models the investment decisions in a liberalized Nordic electric power market. It is an exogenous model constructed outside the Balmorel model but uses the price pictures from the Balmorel model as input. MARS (MARket Simulation) is Eltra's (a Danish electric power transmission company) market model for simulating prices, production, demand and exchanges in the power market. The model covers the Nordic countries (Nord Pool) and Northern Germany. (LN)

  19. Baseline recommendations for greenhouse gas mitigation projects in the electric power sector

    Energy Technology Data Exchange (ETDEWEB)

    Kartha, Sivan; Lazarus, Michael [Stockholm Environment Institute/Tellus Institute, Boston, MA (United States); Bosi, Martina [International Energy Agency, Paris, 75 (France)

    2004-03-01

    The success of the Clean Development Mechanism (CDM) and other credit-based emission trading regimes depends on effective methodologies for quantifying a project's emissions reductions. The key methodological challenge lies in estimating project's counterfactual emission baseline, through balancing the need for accuracy, transparency, and practicality. Baseline standardisation (e.g. methodology, parameters and/or emission rate) can be a means to achieve these goals. This paper compares specific options for developing standardised baselines for the electricity sector - a natural starting point for baseline standardisation given the magnitude of the emissions reductions opportunities. The authors review fundamental assumptions that baseline studies have made with respect to estimating the generation sources avoided by CDM or other emission-reducing projects. Typically, studies have assumed that such projects affect either the operation of existing power plants (the operating margin) or the construction of new generation facilities (the build margin). The authors show that both effects are important to consider and thus recommend a combined margin approach for most projects, based on grid-specific data. They propose a three-category framework, according to projects' relative scale and environmental risk. (Author)

  20. Supplement analysis, Southpoint power project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-16

    The Calpine Corporation applied to interconnect its proposed power plant with the Western Area Power Administration`s (Western) Parker-Davis project in western Arizona. Western, as a major electric transmission system owner is required by existing policies and regulations, to provide access to its transmission system, when requested by an eligible organization. The proposed interconnection would integrate a major source of new generation into the Parker-Davis system which would allow Calpine to supply its power to the electric wholesale market. Based on this application, Western`s proposed action is to enter into an interconnection agreement with Calpine.

  1. Galena Electric Power A Situational Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Robert E. Chaney; Stephen G. Colt; Ronald A. Johnson; Richard W. Wiles; Gregory J. White

    2008-12-31

    The purpose of the investigation is to compare the economics of various electrical power generation options for the City of Galena. Options were assessed over a 30-year project period, beginning in 2010, and the final results were compared on the basis of residential customer electric rates ($/kWh). Galena's electric utility currently generates power using internal combustion diesel engines and generator sets. Nearby, there is an exposed coal seam, which might provide fuel for a power plant. Contributions to the energy mix might come from solar, municipal solid waste, or wood. The City has also been approached by Toshiba, Inc., as a demonstration site for a small (Model 4S) nuclear reactor power plant. The Yukon River is possibly a site for in-river turbines for hydroelectric power. This report summarizes the comparative economics of various energy supply options. This report covers: (1) thermal and electric load profiles for Galena; (2) technologies and resources available to meet or exceed those loads; (3) uses for any extra power produced by these options; (4) environmental and permitting issues and then; and (5) the overall economics of each of the primary energy options.

  2. The future of GPS-based electric power system measurements, operation and control

    Energy Technology Data Exchange (ETDEWEB)

    Rizy, D.T. [Oak Ridge National Lab., TN (United States); Wilson, R.E. [Western Area Power Administration, Golden, CO (United States); Martin, K.E.; Litzenberger, W.H. [Bonneville Power Administration, Portland, OR (United States); Hauer, J.F. [Pacific Northwest National Lab., Richland, WA (United States); Overholt, P.N. [Dept. of Energy, Washington, DC (United States); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States)

    1998-11-01

    Much of modern society is powered by inexpensive and reliable electricity delivered by a complex and elaborate electric power network. Electrical utilities are currently using the Global Positioning System-NAVSTAR (GPS) timekeeping to improve the network`s reliability. Currently, GPS synchronizes the clocks on dynamic recorders and aids in post-mortem analysis of network disturbances. Two major projects have demonstrated the use of GPS-synchronized power system measurements. In 1992, the Electric Power Research Institute`s (EPRI) sponsored Phase Measurements Project used a commercially available Phasor Measurements Unit (PMU) to collect GPS-synchronized measurements for analyzing power system problems. In 1995, Bonneville Power Administration (BPA) and Western Area Power Administration (WAPA) under DOE`s and EPRI`s sponsorship launched the Wide Area Measurements (WAMS) project. WAMS demonstrated GPS-synchronized measurements over a large area of their power networks and demonstrated the networking of GPS-based measurement systems in BPA and WAPA. The phasor measurement technology has also been used to conduct dynamic power system tests. During these tests, a large dynamic resistor was inserted to simulate a small power system disturbance.

  3. The projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2010-10-01

    This paper describes the outcomes from the joint report between the Nuclear Energy Agency and the International Energy Agency of the OECD on the projected costs of generating electricity. The study contains data on electricity generating costs for almost 200 power plants provided by 17 OECD member countries, 4 non-OECD countries and 4 industrial companies or industry organisations. The paper presents the projected costs of generating electricity calculated according to common methodological rules on the basis of the data provided by participating countries and organisations. Data were received for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. Cost estimates were also provided for combined heat and power plants, as well as for coal plants that include carbon capture. As in previous studies of the same series, all costs and benefits were discounted or capitalised to the date of commissioning in order to calculate the state of the electricity costs per MWh, based on plant operating lifetime data. In addition, the paper contains a discussion of a number of factors affecting the cost of capital, the outlook for carbon capture and storage and the working of electricity markets. (Author)

  4. Privatisation electric power sector in Pakistan: some important issues

    International Nuclear Information System (INIS)

    Ghafoor, A.; Weiss, J.

    1998-01-01

    This discussion paper highlights important issues relating to the privatisation of Pakistan's electric power sector. Salient features of the electric power sector in Pakistan, factors affecting the economic performance of this sector, the partial privatisation policy adopted by Pakistan, ongoing private power projects, and current privatisation policy are examined. The arguments for competition are raised, and alternative policy reforms the are considered

  5. National campaign - 100 collectivities connected to the green electric power

    International Nuclear Information System (INIS)

    2004-01-01

    Since july 2004, the local collectivities, the little and medium enterprises and the craft workers can choose their electric power supplier. This offer can be a chance for the renewable energy. The association ''eco maires'' with the help of the WWF began a campaign to obtain the involvement of 100 collectivities interested by the green electric power. The project is presented. The authors presents also the new European Network on the green electric power, Eugene (European Green Electricity Network), which aims to harmonize criteria on the green electric power and to deliver certificates of quality. (A.L.B.)

  6. Electricity generation projections of the world and Brazil

    International Nuclear Information System (INIS)

    Dias, Marcio Soares

    2002-01-01

    The world use of electricity is projected to increase by 9,570 billions kWh over a span of 20 years. Natural gas is expected to account for the largest increment in electricity generation. As a result of high oil and natural gas consumption fuel prices are projected to rise in nominal dollars over the forecast horizon. Higher capacity utilisation and fewer expected retirements of running nuclear plants have resulted in a revision of EIA's projected consumption of electricity from nuclear power. Projection of 3.6%/year in the electricity consumption in Brazil is lower than the historical correlation given by the GDP (5%) growth rate plus 1.2 to 1.7%. GDP and energy consumption growth rates for Brazil are projected to be higher than the world value, but are lower than the projected values for countries like Mexico and China. Trends in primary fuel prices and external dependence on fuel supply are important factors for the Brazilian investments on electricity generation due their impact on costs and standard of living. (author)

  7. Instruments for the regulation of the electric power projects: An integrated vision of the socio-environmental aspects

    International Nuclear Information System (INIS)

    Regini Nutti, Miriam; Milazzo, Maria Luiza; Rodriguez Garcia, Eduardo; Menezes, Carlos Frederico; Pompeu Serran, Flavia; Sebastiao Costa, Luiz; Neves Mundim, Rogerio

    1999-01-01

    The process of institutional change in the Brazilian electric sector accelerated the revision or elaboration of relating normative documents to the elaboration of studies and generation projects and electric power transmission. These documents were produced in a cooperative way by initiative of the organ federal regulator, under the coordination of ELETROBRAS and with the collaboration of technical teams of about ten Brazilian companies of energy. The aspects socio-environmental was absorbed in the normative documents, starting from an integrated vision of content and of the activities proposed with the energy studies and of engineering, allowing to diminish the relating uncertainties to the implementation of the projects and to assist to the national and sector environmental politics

  8. Automating a spacecraft electrical power system using expert systems

    Science.gov (United States)

    Lollar, L. F.

    1991-01-01

    Since Skylab, Marshall Space Flight Center (MSFC) has recognized the need for large electrical power systems (EPS's) in upcoming Spacecraft. The operation of the spacecraft depends on the EPS. Therefore, it must be efficient, safe, and reliable. In 1978, as a consequence of having to supply a large number of EPS personnel to monitor and control Skylab, the Electrical power Branch of MSFC began the autonomously managed power system (AMPS) project. This project resulted in the assembly of a 25-kW high-voltage dc test facility and provided the means of getting man out of the loop as much as possible. AMPS includes several embedded controllers which allow a significant level of autonomous operation. More recently, the Electrical Division at MSFC has developed the space station module power management and distribution (SSM/PMAD) breadboard to investigate managing and distributing power in the Space Station Freedom habitation and laboratory modules. Again, the requirement for a high level of autonomy for the efficient operation over the lifetime of the station and for the benefits of enhanced safety has been demonstrated. This paper describes the two breadboards and the hierarchical approach to automation which was developed through these projects.

  9. Simulation-based valuation of project finance investments. Crucial aspects of power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Pietz, Matthaeus

    2010-12-15

    The liberalization of electricity markets transformed a regulated and stable market to a market with former unknown price volatility. This results in a high uncertainty which is mainly due to the, from an economic point of view, lack of storability of the commodity electricity. Thus investments in power plants are highly risky. This dissertation analyzes crucial aspects within the valuation of a power plant financed via project finance, a popular financing method for projects with high capital requirements. Starting with the development of a valuation model based on stochastic modelling of the future cash flows the focus of the analysis is on the impact of model complexity and electricity prices. (orig.)

  10. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 1: Summary

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  11. The electric power engineering handbook electric power generation, transmission, and distribution

    CERN Document Server

    Grigsby, Leonard L

    2012-01-01

    Featuring contributions from worldwide leaders in the field, the carefully crafted Electric Power Generation, Transmission, and Distribution, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) provides convenient access to detailed information on a diverse array of power engineering topics. Updates to nearly every chapter keep this book at the forefront of developments in modern power systems, reflecting international standards, practices, and technologies. Topics covered include: * Electric Power Generation: Nonconventional Methods * Electric Power Generation

  12. Strategy of investment in electricity sources--Market value of a power plant and the electricity market

    Science.gov (United States)

    Bartnik, R.; Hnydiuk-Stefan, A.; Buryn, Z.

    2017-11-01

    This paper reports the results of the investment strategy analysis in different electricity sources. New methodology and theory of calculating the market value of the power plant and value of the electricity market supplied by it are presented. The financial gain forms the most important criteria in the assessment of an investment by an investor. An investment strategy has to involve a careful analysis of each considered project in order that the right decision and selection will be made while various components of the projects will be considered. The latter primarily includes the aspects of risk and uncertainty. Profitability of an investment in the electricity sources (as well as others) is offered by the measures applicable for the assessment of the economic effectiveness of an investment based on calculations e.g. power plant market value and the value of the electricity that is supplied by a power plant. The values of such measures decide on an investment strategy in the energy sources. This paper contains analysis of exemplary calculations results of power plant market value and the electricity market value supplied by it.

  13. Power sector development in a common Baltic electricity market. Executive summary

    International Nuclear Information System (INIS)

    2005-05-01

    In the years to come the Baltic electricity sector is expected to go through major changes. up till recently the sector has been characterised by vertically integrated monopolies, but at present the electricity sectors in the Baltic States are undergoing reform processes to meet the requirements of the EU directives regarding liberalisation of electricity sectors. This implies a different organisation of the sector, with new roles and responsibilities, and focus on new issues such as a well-functioning electricity market, security of supply and market power. In this project long-term scenario analyses are used to clarify the challenges facing the future Baltic electricity market and to analyse the robustness of the power sector. The project examines how existing power plants will manage in a competitive market, how power prices will develop and which investments are likely to be preferred by investors, among other issues. (BA)

  14. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  15. The Comparative Effectiveness of Variants of Construction of Electricity Export Projects

    Directory of Open Access Journals (Sweden)

    Anatoly Vladimirovich Lagerev

    2014-06-01

    Full Text Available The study describes a methodological approach that evaluates the comparative efficiency of construction of export-oriented power plants and transmission lines taking into account the development of power industry in the region and uncertainty (ambiguity of initial information. At the first stage the authors determine socio-economic effects of each project of construction of export-oriented power plants. With the help of optimization models they choose options that can guarantee the balanced and cost-effective development of the regional electric power system. Then using a simulation model the researchers assess commercial viability of previously selected projects. The article applies this approach for selecting the preferred option of electricity export from Eastern Siberia to China. This study shows that the project of CPP based on Kovykta natural gas with electricity transmission line to Chinese border (near Zabaikalsk is more preferable one in comparison with other projects (CPP based on Kansk-Achinsk coal in Krasnoyarsky krai; CPP based on coal in the Republic of Buryatia and Zabaikalsky krai (Olon-Shibirskaya CPP; New Kharanorskaya CPP; CPP based on Mugunsky coal in Irkutskaya oblast

  16. Manned spacecraft electrical power systems

    Science.gov (United States)

    Simon, William E.; Nored, Donald L.

    1987-01-01

    A brief history of the development of electrical power systems from the earliest manned space flights illustrates a natural trend toward a growth of electrical power requirements and operational lifetimes with each succeeding space program. A review of the design philosophy and development experience associated with the Space Shuttle Orbiter electrical power system is presented, beginning with the state of technology at the conclusion of the Apollo Program. A discussion of prototype, verification, and qualification hardware is included, and several design improvements following the first Orbiter flight are described. The problems encountered, the scientific and engineering approaches used to meet the technological challenges, and the results obtained are stressed. Major technology barriers and their solutions are discussed, and a brief Orbiter flight experience summary of early Space Shuttle missions is included. A description of projected Space Station power requirements and candidate system concepts which could satisfy these anticipated needs is presented. Significant challenges different from Space Shuttle, innovative concepts and ideas, and station growth considerations are discussed. The Phase B Advanced Development hardware program is summarized and a status of Phase B preliminary tradeoff studies is presented.

  17. Electric power law: your working context for several decades. What must be known about the French law project

    International Nuclear Information System (INIS)

    Playe, D.

    1999-01-01

    The French government will adopt with some reticence the new organization of the electric power market as decided by the European parliament. The French transposition of the European legislative text will be discussed at the French national assembly only in February 1999 and voted only in the second semester. This paper summarizes the main points of the project of law passed in December 9, 1998 and tries to explain the stakes of the new regulatory context for Electricite de France (EdF): creation of a regulation commission, accounting dissociation between production, transport and distribution, the eligible customers, the tariffs of electricity transport, the disagreement between the government and the electric equipment professionals with respect to EdF's position, the social aspects, and the construction of direct power lines in complement of public networks. An interview of G. Poullain, head of the national council of the electric equipment (CNEE), about the future development of EdF is given in inset. (J.S.)

  18. Power processing for electric propulsion

    Science.gov (United States)

    Finke, R. C.; Herron, B. G.; Gant, G. D.

    1975-01-01

    The potential of achieving up to 30 per cent more spacecraft payload or 50 per cent more useful operating life by the use of electric propulsion in place of conventional cold gas or hydrazine systems in science, communications, and earth applications spacecraft is a compelling reason to consider the inclusion of electric thruster systems in new spacecraft design. The propulsion requirements of such spacecraft dictate a wide range of thruster power levels and operational lifetimes, which must be matched by lightweight, efficient, and reliable thruster power processing systems. This paper will present electron bombardment ion thruster requirements; review the performance characteristics of present power processing systems; discuss design philosophies and alternatives in areas such as inverter type, arc protection, and control methods; and project future performance potentials for meeting goals in the areas of power processor weight (10 kg/kW), efficiency (approaching 92 per cent), reliability (0.96 for 15,000 hr), and thermal control capability (0.3 to 5 AU).

  19. The generation of pollution-free electrical power from solar energy.

    Science.gov (United States)

    Cherry, W. R.

    1971-01-01

    Projections of the U.S. electrical power demands over the next 30 years indicate that the U.S. could be in grave danger from power shortages, undesirable effluence, and thermal pollution. An appraisal of nonconventional methods of producing electrical power is conducted, giving particular attention to the conversion of solar energy into commercial quantities of electrical power by solar cells. It is found that 1% of the land area of the 48 states could provide the total electrical power requirements of the U.S. in the year 1990. The ultimate method of generating vast quantities of electrical power would be from a series of synchronous satellites which beam microwave power back to earth to be used wherever needed. Present high manufacturing costs of solar cells could be substantially reduced by using massive automated techniques employing abundant low cost materials.

  20. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Science.gov (United States)

    2010-05-17

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Juniper Canyon I Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION... would be generated from their proposed Juniper Canyon I Wind Energy Project (Wind Project) in Klickitat...

  1. Intelligent marketing of electricity from decentral power sources. Project results of the research project ''Massig''; Intelligente Vermarktung von Strom aus dezentralen Energiequellen. Projektergebnisse des Forschungsvorhabens ''Massig''

    Energy Technology Data Exchange (ETDEWEB)

    Erge, Thomas; Sauer, Christian [Fraunhofer-Institut fuer Solare Energiesysteme ISE, Freiburg (Germany); Barnsteiner, Martin; Preiser, Klaus [Badenova Waermeplus GmbH und Co.KG, Freiburg (Germany)

    2011-07-01

    In the European research project 'Market Access for Smaller Size Intelligent Electricity Generation (Massig)' scientists at the Fraunhofer Institute for Solar Energy Systems (Freiburg, Federal Republic of Germany) examined together with project partners the demand-oriented supply and commercialization of electricity from decentral power generators at the liberalized electricity market. The project team selected target countries and evaluated innovative solutions of marketing especially for specific applications of practice. Such a model project is that of Badenova Waermeplus GmbH (Freiburg, Federal Republic of Germany).

  2. Impact of Ontario electricity industry structure on the viability of cogeneration projects

    International Nuclear Information System (INIS)

    Chuddy, B.

    1999-01-01

    A review of Ontario Hydro's existing market structure and how its move toward a more competitive profile can be advantageous for cogeneration projects was presented. Ontario's existing electric power supply is as follows: 6 fossil fuels stations generate a total of 9, 969 MW of electricity, 23 NUG stations generate 1,541 MW, 3 nuclear stations generate a total of 9,028 MW and 69 hydro-electric stations generates 6,751 MW of electricity. The criteria and characteristics for cogeneration projects were listed. The paper also discussed other topics such as the market price of power, outstanding regulatory issues, market volatility and relative pricing. The prognosis for Ontario cogeneration projects for the early years from 1999-2004 is that for economic reasons, only big projects with large loads of 200 to 800 MW will be considered. In later years, other projects will become economic

  3. Investments and price formation in a liberalized electric power market

    International Nuclear Information System (INIS)

    Morthorst, P.E.

    2005-05-01

    How will the electric power prices in the Nordic electric power market develop if the generation capacity in the coming 10 to 15 years is increased considerably? And what are the conditions for investors to initiate new investments in power plants? Briefly speaking - these are the issues for the project that is reported in this report. The basis for the project has been the Nordic electric power market model and its capability to handle the future extension of the necessary generating capacity. The main issue in the project has been a quantitative analysis of what the prices in the Nordic electric power market will be in the future, depending on the size of new investments in the power generating capacity. Using the Balmorel model, a basic scenario until the year 2020 is made which contains the present decisions about capacity extension only. Up to 2010 this basic scenario can be seen as a probable development. For the period 2010 to 2020, however, the calculations can primarily be seen as illustrations of how the prices may develop, provided that no further investments are made. Thus, for the period 2010 - 2020 it is a 'worst case' that has been analysed. In the basic scenario several cases for the year 2015 are analysed, among others the consequences of wet and dry years and an unusually cold winter. The project also analyses how the price development impacts the profitability of new investments in power capacity, depending on several exogenous events, like use of more wind power and the price on the carbon dioxide market. The analyses present three cases: 1) A single investor not owing other power plants, 2) a single investor owing a number of power plants in which case a new plant will compete with him self, 3) two competing investors investing in the same known power plants. In all cases investments are made in a natural gas combined cycle plant producing both electric power and heat. Furthermore, the investor's own possibility to time his investment has been

  4. Analysis for Large Scale Integration of Electric Vehicles into Power Grids

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Wang, Xiaoru

    2011-01-01

    Electric Vehicles (EVs) provide a significant opportunity for reducing the consumption of fossil energies and the emission of carbon dioxide. With more and more electric vehicles integrated in the power systems, it becomes important to study the effects of EV integration on the power systems......, especially the low and middle voltage level networks. In the paper, the basic structure and characteristics of the electric vehicles are introduced. The possible impacts of large scale integration of electric vehicles on the power systems especially the advantage to the integration of the renewable energies...... are discussed. Finally, the research projects related to the large scale integration of electric vehicles into the power systems are introduced, it will provide reference for large scale integration of Electric Vehicles into power grids....

  5. Wireless (Power Transfer Transmission of Electrical Energy (Electricity Intended for Consumer Purposes up to 50 W

    Directory of Open Access Journals (Sweden)

    Marek Piri

    2016-01-01

    Full Text Available This project deals with Power Semiconductor Systems PSS for wireless transmission of electricity to the power of 50~W with regard to the distance and transmission efficiency. We decided to use electromagnetic resonance for electrical energy transmission. For experimental verification, we have wound two coils of identical dimensions. At a given power transmission solutions, we obtain the highest efficiency η = 70% at a distance of 5 cm, where the transmitted power was 48 W.

  6. Electric power supply and demand 1978--1987 for the continuous United States as projected by the Regional Electric Reliability Councils in their April 1, 1978 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    1978-06-15

    The Regional Reliability Council projections of peak demand, generating capability, and electric energy requirements for the contiguous U.S. have declined for the fourth consecutive year. On the basis of these projections, it appears that the electric utility industry believes the U.S. will experience smaller annual increases in power use than have occurred in the past. The summer peak demand growth rates of the Councils range from 3.52 percent annually, as projected by the Northeast Power Coordinating Council, to the 6.21 percent projected by the Southwest Power Pool. Subregional growth covers a wider range, from the 2.77 percent of the New York Power Pool to the 6.51 percent of the Southern Company area. Total reserve margins at the time of summer peak demands are projected to decline from an estimated 30.16 percent in 1978 to about 23.81 percent in 1987. If projected loads are not exceeded, if projected capability levels are actually attained, if fuel requirements are satisfied, and if no contingencies worse than those normally met with are experienced, electric power supply should be adequate for the next decade. However, it is possible that the projected reserve margins will not be attained, and that adequate primary energy supply (fuel and hydro) will not be available when needed. Completion of generating units and transmission facilities on schedule is made uncertain by difficulties related to financing, environmental pressures, procedural delays and some inadequacies with respect to quality control of manufactured and field-assembled components.

  7. Survey and analysis of selected jointly owned large-scale electric utility storage projects

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    The objective of this study was to examine and document the issues surrounding the curtailment in commercialization of large-scale electric storage projects. It was sensed that if these issues could be uncovered, then efforts might be directed toward clearing away these barriers and allowing these technologies to penetrate the market to their maximum potential. Joint-ownership of these projects was seen as a possible solution to overcoming the major barriers, particularly economic barriers, of commercializaton. Therefore, discussions with partners involved in four pumped storage projects took place to identify the difficulties and advantages of joint-ownership agreements. The four plants surveyed included Yards Creek (Public Service Electric and Gas and Jersey Central Power and Light); Seneca (Pennsylvania Electric and Cleveland Electric Illuminating Company); Ludington (Consumers Power and Detroit Edison, and Bath County (Virginia Electric Power Company and Allegheny Power System, Inc.). Also investigated were several pumped storage projects which were never completed. These included Blue Ridge (American Electric Power); Cornwall (Consolidated Edison); Davis (Allegheny Power System, Inc.) and Kttatiny Mountain (General Public Utilities). Institutional, regulatory, technical, environmental, economic, and special issues at each project were investgated, and the conclusions relative to each issue are presented. The major barriers preventing the growth of energy storage are the high cost of these systems in times of extremely high cost of capital, diminishing load growth and regulatory influences which will not allow the building of large-scale storage systems due to environmental objections or other reasons. However, the future for energy storage looks viable despite difficult economic times for the utility industry. Joint-ownership can ease some of the economic hardships for utilites which demonstrate a need for energy storage.

  8. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  9. The electric power engineering handbook electric power transformer engineering

    CERN Document Server

    Harlow, James H

    2012-01-01

    Electric Power Transformer Engineering, Third Edition expounds the latest information and developments to engineers who are familiar with basic principles and applications, perhaps including a hands-on working knowledge of power transformers. Targeting all from the merely curious to seasoned professionals and acknowledged experts, its content is structured to enable readers to easily access essential material in order to appreciate the many facets of an electric power transformer.Topically structured in three parts, the book: * Illustrates for electrical engineers the relevant theories and pri

  10. Salt Lake City Utah Integrated Projects electric power marketing. Final environmental impact statement, Volume 5: Appendix E

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  11. Modernization of the Electric Power Systems (transformers, rods and switches) in the Laguna Verde Nuclear Power Plant (Mexico)

    International Nuclear Information System (INIS)

    Gonzalez Solarzano, J. J.; Gabaldon Martin, M. A.; Pallisa Nunez, J.; Florez Ordeonez, A.; Fernandez Corbeira, A.; Prieto Diez, I.

    2010-01-01

    Description of the changes made in the Electric Power Systems as a part of the power increase project in the Laguna Verde Nuclear Power Plant (Mexico). The main electrical changes to make, besides the turbo group, are the main generation transformers, the isolated rods and the generation switch.

  12. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  13. Electric Power Generation from Low to Intermediate Temperature Resourcces

    Energy Technology Data Exchange (ETDEWEB)

    Gosnold, William [Univ. of North Dakota, Grand Forks, ND (United States); Mann, Michael [Chemical Engineering Department, University of North Dakota, Grand Forks, ND (United States); Salehfar, Hossein [Univ. of North Dakota, Grand Forks, ND (United States)

    2017-03-20

    The UND-CLR Binary Geothermal Power Plant was a collaborative effort of the U.S. Department of Energy (DOE), Continental Resources, Inc. (CRL), Slope Electric Cooperative (SEC), Access Energy, LLC (AE), Basin Electric Cooperative (BEC), Olson Construction, the North Dakota Industrial Commission Renewable Energy Council (NDIC-REC), the North Dakota Department of Commerce Centers of Excellence Program (NDDC-COE), and the University of North Dakota (UND). The primary objective of project was to demonstrate/test the technical and economic feasibility of generating electricity from non-conventional, low-temperature (90 ºC to 150 °C) geothermal resources using binary technology. CLR provided the access to 98 ºC water flowing at 51 l s-1 at the Davis Water Injection Plan in Bowman County, ND. Funding for the project was from DOE –GTO, NDIC-REC, NDD-COE, and BEC. Logistics, on-site construction, and power grid access were facilitated by Slope Electric Cooperative and Olson Construction. Access Energy supplied prototype organic Rankine Cycle engines for the project. The potential power output from this project is 250 kW at a cost of $3,400 per kW. A key factor in the economics of this project is a significant advance in binary power technology by Access Energy, LLC. Other commercially available ORC engines have efficiencies 8 to 10 percent and produce 50 to 250 kW per unit. The AE ORC units are designed to generate 125 kW with efficiencies up to 14 percent and they can be installed in arrays of tens of units to produce several MW of power where geothermal waters are available. This demonstration project is small but the potential for large-scale development in deeper, hotter formations is promising. The UND team’s analysis of the entire Williston Basin using data on porosity, formation thicknesses, and fluid temperatures reveals that 4.0 x 1019 Joules of energy is available and that 1.36 x 109 MWh of power could be produced using ORC binary power plants. Much of the

  14. Risk Reduction Methods for Managing the Development of Regional Electric Power Industry

    Directory of Open Access Journals (Sweden)

    Mikhail Kozhevnikov

    2017-11-01

    Full Text Available The development of the regional electric power industry has come to the forefront due to the changing scale, quality, and configuration of electric power infrastructure, and the spread of distributed generation. This gives rise to more stringent requirements regarding the reliability, safety, and environmental impact of electric power supply. This article aims to justify a package of methods that make it possible to identify and minimize investment, production, financial, and environmental risks in order to ensure sustainable development of the regional electric power industry that performs anti-crisis functions, and of individual energy companies. The key method to be employed is integrated resource planning (IRP. As a part of the method, energy conservation, renewable energy sources, and combined heat and power production are considered as equally valid ways of meeting future demand. The authors have designed a methodology for taking into account uncertainty and risk when implementing IRP. The methodology includes analysis of scenarios and decision making processes by calculating past and projected values of profit indicators. When conducting the environmental and economic assessment of an investment project in the electric power industry, the authors suggest using an aggregate indicator of environmental and economic effectiveness that is calculated on the basis of a combination of locally significant positive and negative environmental and economic impacts of the project. The authors formulate conceptual provisions that serve as the foundation for a promising model of the regional electric power industry and which contain recommendations for managing the development of the industry while minimizing organizational, market, and technological risks.

  15. UCH-II, private power project, Dera Murad Jamali, Pakistan. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    Energy Resources International and Power Development Company of Pakistan in association with General Electric Corporation, Inc. offers to build, finance, own and operate a 500+ MW combined cycle natural gas electric power plant, near Dera Murad Jamali, Pakistan. The basis for the undertaking is a carefully balanced and integrated series of contracts for fuel, power purchase, and implementation of the proposed project. The contracts would be established between the Government of Pakistan (GOP), its agencies and instrumentalities, Energy Resources International with Power Development Company and its associates, and a Project Company organized specifically for the undertaking. The report describes the project.

  16. Nuclear Power Project in Thailand

    International Nuclear Information System (INIS)

    Namwong, Ratanachai

    2011-01-01

    The Electricity Generating Authority of Thailand (EGAT), the main power producer in Thailand, was first interested in nuclear power as an electricity option in 1967 when the electricity demand increased considerably for the first time as a result of the economic and industrial growth. Its viability had been assessed several times during the early seventies in relation to the changing factors. Finally in the late 1970s, the proceeding with nuclear option was suspended for a variety of reasons, for instance, public opposition, economic repercussion and the uncovering of the indigenous petroleum resources. Nonetheless, EGAT continued to maintain a core of nuclear expertise. During 1980s, faced with dwindling indigenous fossil fuel resources and restrictions on the use of further hydro as an energy source, EGAT had essentially reconsidered introducing nuclear power plants to provide a significant fraction to the long term future electricity demand. The studies on feasibility, siting and environmental impacts were conducted. However, the project was never implemented due to economics crisis in 1999 and strong opposition by environmentalists and activists groups. The 1986 Chernobyl disaster was an important cause. After a long dormant period, the nuclear power is now reviewed as one part of the solution for future energy supply in the country. Thailand currently relies on natural gas for 70 percent of its electricity, with the rest coming from oil, coal and hydro-power. One-third of the natural gas consumed in Thailand is imported, mainly from neighbouring Myanmar. According to Power Development Plan (PDP) 2007 rev.2, the total installed electricity capacity will increase from 28,530.3 MW in 2007 to 44,281 MW by the end of plan in 2021. Significantly increasing energy demand, concerns over climate change and dependence on overseas supplies of fossil fuels, all turn out in a favor of nuclear power. Under the current PDP (as revised in 2009), two 1,000- megawatt nuclear

  17. Solar wind power electric plant on Vis (Croatia)

    International Nuclear Information System (INIS)

    1998-01-01

    A project of a solar photovoltaic electric power plant presented by the Republic of Croatia at the meeting of the E.P.I.A. Mission for photovoltaic technology of the Mediterranean countries, aroused a great interest of the representatives of the invited countries. However, the interest within Croatia in the project has disappeared although E.P.I.A. offered a financing of two thirds of costs. There are attempts to construct 1800 kw wind-driven generators at the same location not taking into consideration a possibility of building a hybrid solar-wind-power electric plant. The chance that the solar part is completely of domestic origin is not accepted but the preference is given to the building of imported wind-driven generators. (orig.)

  18. Carbon pricing, nuclear power and electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, R.; Keppler, J. H. [OECD Nuclear Energy Agency, 12, boulevard des Iles, 92130 Issy-les-Moulineaux (France)

    2012-07-01

    In 2010, the NEA in conjunction with the International Energy Agency produced an analysis of the Projected Costs of Electricity for almost 200 power plants, covering nuclear, fossil fuel and renewable electricity generation. That analysis used lifetime costs to consider the merits of each technology. However, the lifetime cost analysis is less applicable in liberalised markets and does not look specifically at the viewpoint of the private investor. A follow-up NEA assessment of the competitiveness of nuclear energy against coal- and gas-fired generation under carbon pricing has considered just this question. The economic competition in electricity markets is today between nuclear energy and gas-fired power generation, with coal-fired power generation not being competitive as soon as even modest carbon pricing is introduced. Whether nuclear energy or natural gas comes out ahead in their competition depends on a number of assumptions, which, while all entirely reasonable, yield very different outcomes. The analysis in this study has been developed on the basis of daily data from European power markets over the last five-year period. Three different methodologies, a Profit Analysis looking at historic returns over the past five years, an Investment Analysis projecting the conditions of the past five years over the lifetime of plants and a Carbon Tax Analysis (differentiating the Investment Analysis for different carbon prices) look at the issue of competitiveness from different angles. They show that the competitiveness of nuclear energy depends on a number of variables which in different configurations determine whether electricity produced from nuclear power or from CCGTs generates higher profits for its investors. These are overnight costs, financing costs, gas prices, carbon prices, profit margins (or mark-ups), the amount of coal with carbon capture and electricity prices. This paper will present the outcomes of the analysis in the context of a liberalised

  19. Carbon pricing, nuclear power and electricity markets

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2012-01-01

    In 2010, the NEA in conjunction with the International Energy Agency produced an analysis of the Projected Costs of Electricity for almost 200 power plants, covering nuclear, fossil fuel and renewable electricity generation. That analysis used lifetime costs to consider the merits of each technology. However, the lifetime cost analysis is less applicable in liberalised markets and does not look specifically at the viewpoint of the private investor. A follow-up NEA assessment of the competitiveness of nuclear energy against coal- and gas-fired generation under carbon pricing has considered just this question. The economic competition in electricity markets is today between nuclear energy and gas-fired power generation, with coal-fired power generation not being competitive as soon as even modest carbon pricing is introduced. Whether nuclear energy or natural gas comes out ahead in their competition depends on a number of assumptions, which, while all entirely reasonable, yield very different outcomes. The analysis in this study has been developed on the basis of daily data from European power markets over the last five-year period. Three different methodologies, a Profit Analysis looking at historic returns over the past five years, an Investment Analysis projecting the conditions of the past five years over the lifetime of plants and a Carbon Tax Analysis (differentiating the Investment Analysis for different carbon prices) look at the issue of competitiveness from different angles. They show that the competitiveness of nuclear energy depends on a number of variables which in different configurations determine whether electricity produced from nuclear power or from CCGTs generates higher profits for its investors. These are overnight costs, financing costs, gas prices, carbon prices, profit margins (or mark-ups), the amount of coal with carbon capture and electricity prices. This paper will present the outcomes of the analysis in the context of a liberalised

  20. Oilfield Flare Gas Electricity Systems (OFFGASES Project)

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Henderson; Robert Fickes

    2007-12-31

    that is only 4% the strength of natural gas. The cost of producing oil is to a large extent the cost of electric power used to extract and deliver the oil. Researchers have identified stranded and flared gas in California that could generate 400 megawatts of power, and believe that there is at least an additional 2,000 megawatts that have not been identified. Since California accounts for about 14.5% of the total domestic oil production, it is reasonable to assume that about 16,500 megawatts could be generated throughout the United States. This power could restore the cost-effectiveness of thousands of oil wells, increasing oil production by millions of barrels a year, while reducing emissions and greenhouse gas emissions by burning the gas in clean distributed generators rather than flaring or venting the stranded gases. Most turbines and engines are designed for standardized, high-quality gas. However, emerging technologies such as microturbines have increased the options for a broader range of fuels. By demonstrating practical means to consume the four gas streams, the project showed that any gases whose properties are between the extreme conditions also could be utilized. The economics of doing so depends on factors such as the value of additional oil recovered, the price of electricity produced, and the alternate costs to dispose of stranded gas.

  1. Electric power annual, 1991

    International Nuclear Information System (INIS)

    1993-01-01

    The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. The 1991 edition has been enhanced to include statistics on electric utility demand-side management and nonutility supply. ''The US Electric Power Industry at a Glance'' section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms

  2. Electric power annual 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-06

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  3. Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices

    Science.gov (United States)

    Chassin, David P [Pasco, WA; Donnelly, Matthew K [Kennewick, WA; Dagle, Jeffery E [Richland, WA

    2011-12-06

    Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices are described. In one aspect, an electrical power distribution control method includes providing electrical energy from an electrical power distribution system, applying the electrical energy to a load, providing a plurality of different values for a threshold at a plurality of moments in time and corresponding to an electrical characteristic of the electrical energy, and adjusting an amount of the electrical energy applied to the load responsive to an electrical characteristic of the electrical energy triggering one of the values of the threshold at the respective moment in time.

  4. The transformation of the electric power sector in China

    International Nuclear Information System (INIS)

    Mathews, John A.; Tan, Hao

    2013-01-01

    China's industrial transformation of the past thirty years, when its GDP has been increasing by an average of 10% per year, has been underpinned by an energy industrial revolution. Electrical energy is the driver of this transformation, with China utilizing latecomer advantages in building an electrical energy generation machine of prodigious size. In terms of electrical energy generated, China's system has expanded twelve-fold in 30 years, from 280 TWh in 1980 to over 3500 TWh in 2010. In this paper we describe the principal features of this remarkable transformation, examining the official projections to 2020, the semi-official projections to 2050, and offering our own projections based on observed logistic industrial dynamics for the uptake of renewable energies as well as the continuing role to be played by fossil fuels, particularly coal. We emphasize the role to be played by China's construction of a ‘strong and smart’ electric power grid, as envisaged in the 12th Five Year Plan released in March 2011, and the complementary proposals to build a national high speed rail system. We see China as on track to phase out fossil fuels altogether in its power production system by the end of the century. We develop an argument as to why it might be expected that fossil fuel utilization will decline while renewable energy utilization might increase in China, constituting a genuine energy industrial revolution. - Highlights: ► Our interpretation of official projections to 2020. ► Our projections to 2050 using logistic industrial dynamics. ► A strong and smart national power grid. ► A national high-speed rail system.

  5. International power projections and capital requirements

    International Nuclear Information System (INIS)

    Ann, H.

    1989-01-01

    This work is related to the international power projections and capital requirements of all kinds of energy and the share of electricity. It is also related to the so-called greenhouse effect carbon dioxide concentration in atmosphere. (A.C.A.S.)

  6. CDIO – The steam engine powering the electric grid

    DEFF Research Database (Denmark)

    Træholt, Chresten; Holbøll, Joachim; Thomsen, Ole Cornelius

    2011-01-01

    In building the new DTU B.Eng programme [1] one of the pilots on the 4’th semester is the Design-build project course in Electric Energy Systems. In this course, which is the last Designbuild course many of the CDIO Syllabus bullets [2] are addressed starting with problem identification and formu......In building the new DTU B.Eng programme [1] one of the pilots on the 4’th semester is the Design-build project course in Electric Energy Systems. In this course, which is the last Designbuild course many of the CDIO Syllabus bullets [2] are addressed starting with problem identification...... and formulation, experimental inquiry and modelling, finally leading to planning and solution. The goal is to acquire the skills that are needed for an engineer within electric power engineering to analyse a given task, define the necessary steps to solve the task, organize him/her self and others and finally...... solve the task with success. The concrete work is built up around a miniaturized electric energy system powered by a steam engine. The system mimics an essential sub-section of a real electric power system. The process is realised with a combination of optional lectures, optional exercises, 3 set...

  7. Electric power generation

    International Nuclear Information System (INIS)

    Pinske, J.D.

    1981-01-01

    Apart from discussing some principles of power industry the present text deals with the different ways of electric power generation. Both the conventional methods of energy conversion in heating and water power stations and the facilities for utilizing regenerative energy sources (sun, wind, ground heat, tidal power) are considered. The script represents the essentials of the lecture of the same name which is offered to the students of the special subject 'electric power engineering' at the Fachhochschule Hamburg. It does not require any special preliminary knowledge except for the general principles of electrical engineering. It is addressing students of electrical engineering who have passed their preliminary examination at technical colleges and universities. Moreover, it shall also be of use for engineers who want to obtain a quick survey of the structure and the operating characteristics of the extremely different technical methods of power generation. (orig.) [de

  8. Salt Lake City Area Integrated Projects electric power marketing final environmental impact statement. Volume 4: Appendixes B-D

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alter native

  9. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 2: Sections 1--16

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  10. Projected costs of generating electricity

    International Nuclear Information System (INIS)

    2005-01-01

    Previous editions of Projected Costs of Generating Electricity have served as the reference in this field for energy policy makers, electricity system analysts and energy economists. The study is particularly timely in the light of current discussions of energy policy in many countries. The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today and considered by participating countries as candidates for commissioning by 2010-2015 or earlier. Investors and other decision makers will also need to take the full range of other factors into account (such as security of supply, risks and carbon emissions) when selecting an electricity generation technology. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut ''winner''. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. An appendix to the report provides country statements on generation technologies and costs. Previous studies in the series were published in 1983, 1986, 1990, 1993 and 1998. (author)

  11. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  12. 75 FR 43915 - Basin Electric Power Cooperative: Deer Creek Station

    Science.gov (United States)

    2010-07-27

    ... factors that could be affected by the proposed Project were evaluated in detail in the EIS. These issues... DEPARTMENT OF AGRICULTURE Rural Utilities Service Basin Electric Power Cooperative: Deer Creek... Energy Facility project (Project) in Brookings and Deuel Counties, South Dakota. The Administrator of RUS...

  13. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  14. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  15. Solar electricity power station building. A preliminary project investigation for “PIRIN TEX LTD.” – Gotze Delchgev using

    International Nuclear Information System (INIS)

    Kolev, Boyko; Todorieva, Vanja

    2009-01-01

    The total solar energy absorbed by Earth's atmosphere, oceans and land masses is approximately 3,850,000 exa joules (EJ=1018 J) per year. In 2005, this was more energy in one hour than the world used in one year. Photosynthesis captures approximately 3,000 EJ per year in biomass. The amount of solar energy reaching the surface of the planet is so vast that in one year it is about twice as much as will ever be obtained from all of the Earth's non-renewable resources of coal, oil, natural gas, and mined uranium combined. Natural gas crisis such as this from January 2009 in Bulgaria turn into the best investments the development of technology for renewable energy sources using especially solar energy using for electricity production and water heating. The aims of this article are: To develop a preliminary project for solar electricity power station build-ing; To estimate the profits of solar energy used for electricity production and water heating. Keywords: renewable energy sources, solar energy accumulation, solar electricity power station, natural gas crisis

  16. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  17. Shipboard electrical power systems

    CERN Document Server

    Patel, Mukund R

    2011-01-01

    Shipboard Electrical Power Systems addresses new developments in this growing field. Focused on the trend toward electrification to power commercial shipping, naval, and passenger vessels, this book helps new or experienced engineers master cutting-edge methods for power system design, control, protection, and economic use of power. Provides Basic Transferable Skills for Managing Electrical Power on Ships or on LandThis groundbreaking book is the first volume of its kind to illustrate optimization of all aspects of shipboard electrical power systems. Applying author Mukund Patel's rare combina

  18. Electric Power Infrastructure Reliability And Security Research And Development Initiative. Final report

    International Nuclear Information System (INIS)

    Dale, S.; Meeker, R.; Steurer, M.; Li, H.; Pamidi, S.; Rodrigo, H.; Suryanarayanan, S.; Cartes, D.; Ordonez, J.; Domijan, A.; Liu, W.; Cox, D.; McLaren, P.; Hovsapian, R.; Edwards, D.; Simmons, S.; Wilde, N.; Woodruff, S.; Kopriva, D.; Hussaini, Y.; Mohammed, O.; Zheng, J.; Baldwin, T.L.

    2008-01-01

    This is the final scientific/technical report for the Electric Power Infrastructure Reliability and Security R and D Initiative sponsored by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, under award number DE-FG02-05CH11292. This report covers results from the FSU-led, multi-institution effort conducted over the period 8/15/05 to 10/14/2007. Building upon existing infrastructure for power systems research, modeling, and simulation, the Center for Advanced Power Systems (CAPS) at Florida State University (FSU) is developing world-class programs in electric power systems research and education to support future electric power system needs and challenges. With U.S. Department of Energy Support, FSU CAPS has engaged in a multi-faceted effort to conduct basic and applied research towards understanding, developing, and deploying technologies and approaches that can lead to improved reliability and security of the North American electric power generation and delivery infrastructure. This wide-reaching project, through a number of carefully selected thrusts cutting across several research disciplines, set out to address key terrestrial electric utility power system issues and challenges. The challenges and the thrusts to address them were arrived at through analysis of a number of national reports and recommendations combined with input from an experienced multi-disciplined team of power systems research staff and faculty at FSU CAPS. The resulting project effort can be grouped into four major areas: - Power Systems and New Technology Insertion - Controls, Protection, and Security - Simulation Development - High Temperature Superconductivity (HTS)

  19. Instantaneous input electrical power measurements of HITU transducer

    International Nuclear Information System (INIS)

    Karaboece, B; Guelmez, Y; Rajagapol, S; Shaw, A

    2011-01-01

    HITU (High Intensity Theraupetic Ultrasound) transducers are widely used in therapeutic ultrasound in medicine. The output ultrasonic power of HITU transducer can be measured in number of methods described in IEC 61161 standard [1]. New IEC standards specifically for measurement of HITU equipment are under development. The ultrasound power radiated from a transducer is dependent on applied input electrical voltage and current and consequently power. But, up to now, no standardised method has been developed and adopted for the input electrical power measurements. Hence, a workpackage was carried out for the establishment of such method in the frequency range of 1 to 3 MHz as a part of EURAMET EMRP Era-net plus 'External Beam Cancer Therapy' project. Several current shunts were developed and evaluated. Current measurements were also realized with Philips current probe and preamplifier at NPL and Agilent current probe at UME. In this paper, a method for the measurement of instantaneous electrical power delivered to a reactive ultrasound transducer in the required frequency range is explored.

  20. Instantaneous input electrical power measurements of HITU transducer

    Energy Technology Data Exchange (ETDEWEB)

    Karaboece, B; Guelmez, Y [Tuebitak Ulusal Metroloji Enstituesue (UME), P.K. 54 41470 Gebze-Kocaeli (Turkey); Rajagapol, S; Shaw, A, E-mail: baki.karaboce@ume.tubitak.gov.t [National Physical Laboratory (NPL), Hampton Road, Teddington TW11 0LW (United Kingdom)

    2011-02-01

    HITU (High Intensity Theraupetic Ultrasound) transducers are widely used in therapeutic ultrasound in medicine. The output ultrasonic power of HITU transducer can be measured in number of methods described in IEC 61161 standard [1]. New IEC standards specifically for measurement of HITU equipment are under development. The ultrasound power radiated from a transducer is dependent on applied input electrical voltage and current and consequently power. But, up to now, no standardised method has been developed and adopted for the input electrical power measurements. Hence, a workpackage was carried out for the establishment of such method in the frequency range of 1 to 3 MHz as a part of EURAMET EMRP Era-net plus 'External Beam Cancer Therapy' project. Several current shunts were developed and evaluated. Current measurements were also realized with Philips current probe and preamplifier at NPL and Agilent current probe at UME. In this paper, a method for the measurement of instantaneous electrical power delivered to a reactive ultrasound transducer in the required frequency range is explored.

  1. Projected costs of nuclear and conventional base load electricity generation in some IAEA Member States

    International Nuclear Information System (INIS)

    1990-09-01

    The cost of nuclear and conventional electricity is one of the most important parameters for power system planning, and in particular for decisions on base load power projects. This study reviews the projected levelized electricity generation costs of the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained and evaluated for nuclear and fossil fuelled (mainly coal-fired) plants that could be commissioned in the mid- to late 1990s in 10 IAEA Member States. 27 refs, figs and tabs

  2. Assessment of electrical equipment aging for nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    The electrical and instrumentation equipments, especially whose parts are made of polymer material, are gradually degraded by thermal and radiation environment in the normal operation, and the degradation is thought to progress rapidly when they are exposed to the environment of the design basis event (DBE). The integrity of the equipments is evaluated by the environmental qualification (EQ) test simulating the environment of the normal operation and the DBE. The project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) indicated the importance of applying simultaneous thermal and radiation aging for simulating the aging in normal operation. The project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008 to apply the outcome of ACA to the other electrical and instrumentation equipment and to establish an advanced EQ test method that can appropriately simulate the environment in actual plants. In FY2012, aging characteristics of thermal aging and simultaneous aging were obtained for the epoxy resin of electrical penetrations and the O-ring of connectors. Physical property measurement was carried out for epoxy resin of electrical penetration subject to the type testing in FY2010. (author)

  3. Assessment of electrical equipment aging for nuclear power plant

    International Nuclear Information System (INIS)

    2013-01-01

    The electrical and instrumentation equipments, especially whose parts are made of polymer material, are gradually degraded by thermal and radiation environment in the normal operation, and the degradation is thought to progress rapidly when they are exposed to the environment of the design basis event (DBE). The integrity of the equipments is evaluated by the environmental qualification (EQ) test simulating the environment of the normal operation and the DBE. The project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) indicated the importance of applying simultaneous thermal and radiation aging for simulating the aging in normal operation. The project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008 to apply the outcome of ACA to the other electrical and instrumentation equipment and to establish an advanced EQ test method that can appropriately simulate the environment in actual plants. In FY2012, aging characteristics of thermal aging and simultaneous aging were obtained for the epoxy resin of electrical penetrations and the O-ring of connectors. Physical property measurement was carried out for epoxy resin of electrical penetration subject to the type testing in FY2010. (author)

  4. Belene Nuclear Power Plant project status

    International Nuclear Information System (INIS)

    Nikolov

    2008-01-01

    The status of the Belene project with the following main features is described: Reactor type - PWR, Russian Design Plant supplier - ASE, AREVA NP/Siemens Reactor thermal power - 2 x 3012 MW Electric output -2 x 1060 MW Net efficiency - 35 % Capacity factor - 90 % Design Life Time - 60 years

  5. The Ocean State Power Project

    International Nuclear Information System (INIS)

    Makowski, J.

    1987-01-01

    Ocean State Power is an independent partnership in the form of utility companies and private developers who have joined forces to build a gas-fired, combined cycle generating plant in Burrillville, Rhode Island. The initial capacity of the plant is expected to be approximately 250 MW, with a provision to double the size. Unit I will be on-line 2989/2990 with unit II shortly thereafter. The OSP equity group includes TransCanada PipeLines, Easter Utilities Associates, New England Electric System, Newport Electric and J. Makowski Associates. The author describes the project's major features and turns to a brief status report on the contracts and licenses. Ocean State Power came about because of; the rapid growth in demand for capacity in new England; the availability of a long-term supply of natural gas from Canada which has recently revised export policies and the inherent efficiency and reliability of combined cycle power generation

  6. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  7. Electric power industry in China

    Energy Technology Data Exchange (ETDEWEB)

    Zisheng Jiang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents the status of the electric power in China, highlighting the following aspects: recent achievement, electricity increased sharing in the total energy consumption, technical economic indexes, nuclear power, renewable energy sources, rural electrification, transmission and power network, transmission lines and substations, present status and development trends for power network, regulation of power system dispatching, power system communication. The document also presents the future developing plan, approaching the outlook and strategy, development targets of the electric power industry and the administrative system reforming of the electric power industry.

  8. New directions in electric power financing

    International Nuclear Information System (INIS)

    Jechoutek, K.G.; Lamech, Ranjit

    1995-01-01

    This paper argues that it is necessary to raise the eyes from the current focus on independent power projects, buttressed by guarantees, to the longer horizon of electric power financing in open markets. Transitional strategies will need to move beyond the commonly seen IPP activity that occurs without fundamental sector reform, and demand-side incentives that introduce further market distortions. These efforts will have to focus on macroeconomic stabilization, removal of price distortions, as well as sector and corporate reform. Mobilization of domestic capital will be essential for sustainable sector financing. Although guarantees to encourage power sector investment can be designed to selectively cover risks, their elimination through fundamental sector reform should be the ultimate goal. Over the longer-term traditional corporate finance should become a more common financing strategy than project finance. Innovations in performance risk management and consumer credit will be crucial to the financing of energy efficiency. (author)

  9. Factors Causing Delay of Modification Projects at Koeberg Nuclear Power Station

    International Nuclear Information System (INIS)

    Ntoyanto, S.

    2017-01-01

    Modification project delays could lead to: disrupting the maintenance shutdown (outage) projects' schedule, affecting electricity capacity of the national grid., possible load-shedding restricting electricity supply to domestic, commercial, and industrial consumers; and detrimental consequences to the country's economic activities. To address proficiency of a project manager by improving: Understanding of the organizational processes, High-level technical knowledge of a nuclear power plant technology

  10. Electric vehicle system for charging and supplying electrical power

    Science.gov (United States)

    Su, Gui Jia

    2010-06-08

    A power system that provides power between an energy storage device, an external charging-source/load, an onboard electrical power generator, and a vehicle drive shaft. The power system has at least one energy storage device electrically connected across a dc bus, at least one filter capacitor leg having at least one filter capacitor electrically connected across the dc bus, at least one power inverter/converter electrically connected across the dc bus, and at least one multiphase motor/generator having stator windings electrically connected at one end to form a neutral point and electrically connected on the other end to one of the power inverter/converters. A charging-sourcing selection socket is electrically connected to the neutral points and the external charging-source/load. At least one electronics controller is electrically connected to the charging-sourcing selection socket and at least one power inverter/converter. The switch legs in each of the inverter/converters selected by the charging-source/load socket collectively function as a single switch leg. The motor/generators function as an inductor.

  11. Liberation of electric power and nuclear power generation

    International Nuclear Information System (INIS)

    Yajima, Masayuki

    2000-01-01

    In Japan, as the Rule on Electric Business was revised after an interval of 35 years in 1995, and a competitive bid on new electric source was adopted after 1996 fiscal year, investigation on further competition introduction to electric power market was begun by establishment of the Basic Group of the Electric Business Council in 1997. By a report proposed on January, 1999 by the Group, the Rule was revised again on March, 1999 to start a partial liberation or retail of the electric power from March, 2000. From a viewpoint of energy security and for solution of global environmental problem in Japan it has been decided to positively promote nuclear power in future. Therefore, it is necessary to investigate how the competition introduction affects to development of nuclear power generation and what is a market liberation model capable of harmonizing with the development on liberation of electric power market. Here was elucidated on effect of the introduction on previous and future nuclear power generation, after introducing new aspects of nuclear power problems and investigating characteristic points and investment risks specific to the nuclear power generation. And, by investigating some possibilities to development of nuclear power generation under liberation models of each market, an implication was shown on how to be future liberation on electric power market in Japan. (G.K.)

  12. Risk management in the electric power sector, v. 16(61)

    International Nuclear Information System (INIS)

    Iliev, Atanas; Minovski, Dragan

    2008-01-01

    This paper presents the basics of the risk theory and the main methods which could be applied for risk management in electrical power system utilities. Taking into consideration that the risk and uncertainty not be completely eliminated, the engineers have to know to manage the risk and uncertainty. The main goal is to minimized the negative effects from accepted risk in order to increase expected incomes and expected profit. Special attention is dedicated to risk management in complex project in Electric Power Systems in a new deregulated electricity market which has the influence to the market stability, expected incomes and quality of the delivered electricity. Specially, the risk management in the companies - producers of the electricity is analysed, since theirs further investments in a rehabilitation of the current power plants as well in the construction of the new plants will be based on the economical principles of profit. (Author)

  13. Risk management in the electric power sector, v. 16(62)

    International Nuclear Information System (INIS)

    Iliev, Atanas; Minovski, Dragan

    2008-01-01

    This paper presents the basics of the risk theory and the main methods which could be applied for risk management in electrical power system utilities. Taking into consideration that the risk and uncertainty not be completely eliminated, the engineers have to know to manage the risk and uncertainty. The main goal is to minimized the negative effects from accepted risk in order to increase expected incomes and expected profit. Special attention is dedicated to risk management in complex project in Electric Power Systems in a new deregulated electricity market which has the influence to the market stability, expected incomes and quality of the delivered electricity. Specially, the risk management in the companies - producers of the electricity is analysed, since theirs further investments in a rehabilitation of the current power plants as well in the construction of the new plants will be based on the economical principles of profit. (Author)

  14. Advanced design nuclear power plants: Competitive, economical electricity. An analysis of the cost of electricity from coal, gas and nuclear power plants

    International Nuclear Information System (INIS)

    1992-06-01

    This report presents an updated analysis of the projected cost of electricity from new baseload power plants beginning operation around the year 2000. Included in the study are: (1) advanced-design, standardized nuclear power plants; (2) low emissions coal-fired power plants; (3) gasified coal-fired power plants; and (4) natural gas-fired power plants. This analysis shows that electricity from advanced-design, standardized nuclear power plants will be economically competitive with all other baseload electric generating system alternatives. This does not mean that any one source of electric power is always preferable to another. Rather, what this analysis indicates is that, as utilities and others begin planning for future baseload power plants, advanced-design nuclear plants should be considered an economically viable option to be included in their detailed studies of alternatives. Even with aggressive and successful conservation, efficiency and demand-side management programs, some new baseload electric supply will be needed during the 1990s and into the future. The baseload generating plants required in the 1990s are currently being designed and constructed. For those required shortly after 2000, the planning and alternatives assessment process must start now. It takes up to ten years to plan, design, license and construct a new coal-fired or nuclear fueled baseload electric generating plant and about six years for a natural gas-fired plant. This study indicates that for 600-megawatt blocks of capacity, advanced-design nuclear plants could supply electricity at an average of 4.5 cents per kilowatt-hour versus 4.8 cents per kilowatt-hour for an advanced pulverized-coal plant, 5.0 cents per kilowatt-hour for a gasified-coal combined cycle plant, and 4.3 cents per kilowatt-hour for a gas-fired combined cycle combustion turbine plant

  15. Driving with electrical power

    International Nuclear Information System (INIS)

    Ursin, M.; Hoeckel, M.

    2008-01-01

    This article takes a look at the chances offered to the electricity supply industry by the increasing use of battery-driven vehicles - and the advantages thus offered to the environment. The use of the vehicles' batteries to form a distributed electricity storage scheme is discussed. The authors comment that, although electrically-driven vehicles consume more power, the total primary energy consumption and pollutant emissions will be reduced. The actual electricity consumption of electric vehicles and the source of this power are examined. Power saved by the reduced use of electrical heating systems and boilers could, according to the authors, be used to charge the batteries of electric vehicles. The use of these batteries as a storage system to help regulate electricity supplies is discussed and the steps to be taken for the implementation of such a system are listed

  16. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  17. Impacts of Western Area Power Administration's power marketing alternatives on electric utility systems

    International Nuclear Information System (INIS)

    Veselka, T.D.; Portante, E.C.; Koritarov, V.

    1995-03-01

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration's Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western's Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated

  18. Electric Power From Ambient Energy Sources

    Energy Technology Data Exchange (ETDEWEB)

    DeSteese, John G.; Hammerstrom, Donald J.; Schienbein, Lawrence A.

    2000-10-03

    This report summarizes research on opportunities to produce electric power from ambient sources as an alternative to using portable battery packs or hydrocarbon-fueled systems in remote areas. The work was an activity in the Advanced Concepts Project conducted by Pacific Northwest National Laboratory (PNNL) for the Office of Research and Development in the U.S. Department of Energy Office of Nonproliferation and National Security.

  19. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  20. Air quality enhancement by reducing emissions from electric power industry

    International Nuclear Information System (INIS)

    Hamzeh, Ali

    2006-01-01

    The electric power industry is responsible for electricity generations, transmission and distribution. The system is dominated by thermal electricity generation (in Syria its share is about 80%). The fossil fuels used in te thermal power plants are a major stationary source of greenhouse gases (GHG) in addition to other pollutant. The primary GHG are CO 2 , NO x , SO 2 , CO, and VOC, of which CO 2 is believed to account for about half of the global warming. There are many approaches to reduce the amount of pollutants emitted from power systems. The best measures as given mainly by Intergovernmental Panel on Climate Change (IPCC), 1996 are presented in the paper. From the efficiency and sustainability side of view, the implementation of these approaches cannot be done optimally without an integrated environmental management program (EMP). The paper proposes an EMP as a conceptual strategy using a set of evaluation criteria to be applied on the power system on concern. As a final item, a case study of the Syrian power system is presented. The energy system in Syria emitted about 115 million tons of CO 2 in the year 2000. The electric power system alone consumes approximately 36% of the total consumed fossil fuels in the country, and is responsible of about 35-40% of the CO 2 emissions. The Syrian power system has three major problems (like many systems in the region) which need to be resolved in order to improve its operation and consequently to reduce the emission of green house gases. First, the technical electrical losses are about 25-30% of net generated electricity. Second, the power factor has reached alarming levels in various parts of the power system. Third, the efficiencies in all power plant units are very low and still decreasing rapidly. The paper gives an overview of the energy sector in Syria showing a significant potential for energy efficiency and environmental protection projects. The main outcome of the case study is a comprehensive program

  1. Vehicle-to-Grid Power in Danish Electric Power Systems

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2009-01-01

    The integration of renewable energy systems is often constrained by the variable nature of their output. This demands for the services of storing the electricity generated from most of the renewable energy sources. Vehicle-to-grid (V2G) power could use the inherent energy storage of electric...... vehicles and its quick response time to balance and stabilize a power system with fluctuating power. This paper outlines the use of battery electric vehicles in supporting large-scale integration of renewable energy in the Danish electric power systems. The reserve power requirements for a high renewable...... energy penetration could be met by an amount of V2G based electric vehicles less than 10% of the total vehicle need in Denmark. The participation of electric vehicle in ancillary services would earn significant revenues to the vehicle owner. The power balancing services of electric vehicles...

  2. Electric power development in the USSR

    International Nuclear Information System (INIS)

    Rudenko, Y.N.

    1993-01-01

    The generation of electric power in the USSR is based on the Unified Electric Power System (UEPS) whose network cover most of the habitable territory of the country. Therefore, the development of the UEPS governs the overall evolution of the electric power generation in the country. At present, eleven out of thirteen joint electric power systems, which supply electricity to most of the USSR, are operating within the UEPS. The total electric power generation in the country reached 1728 billion kWh in 1990, of which the UEPS supplied approximately 90%. About 70% of installed capacity of the UEPS is fossil-fuelled power plants, about 12 % is nuclear power plants, and about 18% is hydroelectric power plants. The system-forming grid of the UEPS is made up of transmission lines of 220, 330, 500 and 750 kV. The on-line supervisory control of the UEPS is achieved by four-level automated system of dispatch control (UEPS, joint electric power systems, regional electric power systems, electric power plants, substations,electric grid regions). The development and extension of the UEPS in the USSR ensure higher reliability and quality of electric power supply to end-users, combined with higher efficiency. The principal problem facing the UEPS are as follows: the need to ensure environmental protection and efficiency of the steam power plants; to improve the safety and efficiency of nuclear power plants. The solution to these problems will define the conditions of the UEPS development, as well as electric power systems of other countries, at least for the coming two decades. This paper characterizes the peculiarities of the UEPS development over the last 20 years, including the installed capacity structure and the system-forming electric power grid. Special attention is paid to the environmental problems related to functioning and development of the UEPS and to the means of their solution. (author)

  3. Possibilities for retrofitting of the existing thermal electric power plants using solar power technologies

    International Nuclear Information System (INIS)

    Matjanov, Erkinjon K.; Abduganieva, Farogat A.; Aminov, Zarif Z.

    2012-01-01

    possibilities for retrofitting of the Tashkent thermal electric power plant on the basis of solar power technologies are being discussed with the German partners in the framework of the Joint-research project, funded by Volkswagenstiftung foundation (Germany) entitled 'Optimum feed-in of solar heat for conversion of low-efficient fossil-fired steam power plants to low-emission solar hybrid power plants by example of Uzbekistan'. The main data on the Tashkent thermal electric power plant: 12 steam turbines with total electric power output 1830 MW are installed. Main fuel - natural gas. Specific mass flow of the fuel - 394 gram/kWph. Electric efficiency of the power plant - 31,2 %. There is a reservoir for a masut (black oil) for 80 000 tons in the power plant, which consists of 7 masut tanks each of 10000 m 3 and 6 masut tanks each of 5000 m 3 . The following possibilities of retrofitting of the Tashkent thermal electric power plant with using solar technologies are being considered: 1. Installing a solar-fed steam generator instead of the existing steam generator. 2. Installing a solar-fed steam generator parallel to the existing steam generator. 3. Installing solar-heated feed water pre-heaters instead of the existing high-pressure and low-pressure feed water pre-heaters. 4. Installing solar-heated feed water pre-heaters parallel to the existing high-pressure and low-pressure feed water pre-heaters. The results of the researches are expected to improve electric efficiency of the Tashkent thermal electric power plant simultaneously reducing emissions into the environment. (authors)

  4. Project finance risk evaluation of the Electric power industry of Serbia

    International Nuclear Information System (INIS)

    Makajic Nikolic, Dragana; Jednak, Sandra; Benkovic, Sladana; Poznanic, Vladimir

    2011-01-01

    From the aspect of the development of a country, the energy sector represents a domain of strategic interest. Generation and use of energy resources most often belongs to the public sector, and are most often under the influence of the government in most countries. This paper analyzes the risks that are characteristic to the business of the public enterprise, Electric Power Industry of Serbia (EPS). EPS has started its restructuring and is adjusting to changes and challenges imposed by the launched reforms in the energy sector. However, due to certain limitations, it is still not possible to implement its complete restructuring and modernization. The paper aims to point at the risks a potential strategic partner faces. The risks have been identified as commercial, financial and political, classification immanent for project finance, and their evaluation was done using Failure Mode and Effects Analysis (FMEA). Risk analysis was performed based on current conditions for two potential scenarios that predict different types of changes in the analyzed period. The results of the analysis show that the potential strategic partner should pay special attention to price risks, estimation, investments, project activity neglect, quasi-risks and debt collection. - Highlights: → Paper analyze all risks characteristic for business running of the public enterprise EPS. → Potential strategic partner faces with the commercial, financial and political risks. → Risk analysis was done using FMEA. → Results are indicating high risk of investing in EPS. → The highest risks are commercial risks, especially price risks.

  5. Nuclear-electric power in space

    International Nuclear Information System (INIS)

    Truscello, V.C.; Davis, H.S.

    1984-01-01

    Because direct-broadcast satellites, air-traffic-control radar satellites, industrial processing on subsequent versions of the space station, and long range excursions to other planets using nuclear-electric propulsion systems, all space missions for which current power-supply systems are not sufficient. NASA and the DOE therefore have formed a joint program to develop the technology required for nuclear-reactor space power plants. After investigating potential space missions in the given range, the project will develop the technology to build such systems. High temperatures pose problems, ''hot shoes'' and ''cold shoes'', a Stirling engine dynamic system, and critical heat-transfer problems are all discussed. The nuclear reactor system for space as now envisioned is schematicized

  6. Nuclear Power and Ghana's Future Electricity Generation

    International Nuclear Information System (INIS)

    Ennison, I.; Dzobo, M.

    2011-01-01

    One of the major challenges facing Ghana in her developmental efforts is the generation of adequate and affordable electricity to meet increasing demand. Problems with the dependency on hydro power has brought insecurity in electricity supply due to periodic droughts. Thermal power systems have been introduced into the electricity generation mix to complement the hydro power supply but there are problems associated with their use. The high price of crude oil on the international market has made them expensive to run and the supply of less expensive gas from Steps are being taken to run the thermal plants on less expensive gas from Nigeria has delayed due to conflicts in the Niger Delta region and other factors. The existing situation has therefore called for the diversification of the electricity generation mix so as to ensure energy security and affordable power supply. This paper presents the nuclear option as a suitable alternative energy source which can be used to address the energy supply problems facing the nation as well the steps being taken towards its introduction in the national energy mix. In addition, electricity demand projections using the MAED model as well as other studies are presented. The expected electricity demand of 350000 GWh (4000MWyr) in 2030, exceeds the total electricity supply capability of the existing hydropower system, untapped hydro resources and the maximum amount of gas that can be imported from Nigeria through the West Africa pipeline. Also presented is a technological assessment on the type of nuclear reactor to be used. The technological assessment which was done based on economics, grid size, technological maturity, passive safety and standardization of reactor design, indicate that a medium sized pressurized water reactor (i.e. a PWR with capacity 300MW to 700MW) is the most favourable type of reactor. In addition the challenges facing the implementation of the nuclear power programme in Ghana are presented. (author)

  7. Joint management of water and electricity in State Water Project

    Science.gov (United States)

    Yang, T.

    2013-12-01

    Understanding the relationship between California's water and electrical power is important for improving the management and planning of these two vital resources to the state's economy development and people's well-being. It is often unclear for consumers, managers and decision-makers that water and electricity in California are inextricably connected. In the past, insufficient considerations of electricity production, consumption and cost in the State Water Project (SWP) - the world's largest publicly built and operated water and power development and conveyance system-has led to significant water rate and electricity rate increase. An innovative concept of this proposed study is developing new technology capable of managing and planning water and power jointly in SWP to promote its operation efficiency, sustainability and resilience to potential water shortage caused by climate change and population increase. To achieve this goal, a nonlinear, two-fold network model describing water delivery in company with power consumption and generation will be constructed, and a multi-objective optimization scheme is to be used to resolve this complex nonlinear network problem.

  8. Swiss electrical power association

    International Nuclear Information System (INIS)

    1983-01-01

    Milestones of electrical power development in Switzerland during 1982 are quoted. An energy balance is shown for the utilisation of 864,630 terajoules of primary energy. This is related to global data on per capita power consumption. In the electricity generation section, annual load factors are given for the four nuclear stations. A brief review is made of hydro potential and monthly export/import figures for power to other countries (mostly export, especially in summer). Total electrical power output grew about 1.3% in the last year. Recent transmission line developments are noted, mostly 2x380kV, and including a link with Austria. In the financial section, consumer price indices are quoted for liquid and solid fuel, gas and electricity since 1966. Under administration, details are listed of the main and about 18 supporting Committees and working groups with special functions (e.g. tariffs, electrical vehicles). Public relations have included nuclear power press conferences, a mobile video unit, information leaflets for the media and a teaching seminar. (G.C.)

  9. Energy, Electricity and Nuclear Power Estimates for the Period up to 2050. 2012 Ed

    International Nuclear Information System (INIS)

    2012-01-01

    Reference Data Series No. 1 (RDS-1) is an annual publication - currently in its thirty-second edition - containing estimates of energy, electricity and nuclear power trends up to the year 2050. RDS-1 starts with a summary of the situation of nuclear power in IAEA Member States as of the end of 2011. The data on nuclear power presented in Tables 1 and 2 are based on actual statistical data collected by the IAEA's power Reactor Information System (pRIS). however, energy and electricity data for 2011 are estimated, as the latest information available from the united Nations Department of Economic and Social Affairs is for 2009 only. population data originate from the world population prospects (2010 revision), published by the population Division of the united Nations Department of Economic and Social Affairs. The 2011 values again are estimates. As in previous editions, projections of future energy and electricity demand and the role of nuclear power are presented as low and high estimates encompassing the inherent uncertainties involved in projecting trends. The RDS-1 estimates should be viewed as very general growth trends whose validity must be constantly subjected to critical review. Many international, national and private organizations routinely engage in energy demand and supply projections, including nuclear power. These projections are based on a multitude of different assumptions and aggregating procedures, which make a straightforward comparison and synthesis very difficult. The basic differences refer to such fundamental input assumptions as: - Economic growth; - Correlation of economic growth and energy use; -Technology performance and costs; - Energy resource availability and future fuel prices; - Energy policy and physical, environmental and economic constraints. The projections presented in this publication are based on a compromise between: - National projections supplied by each country for a recent OECD/NEA study; - Indicators of development

  10. Projected Costs of Generating Electricity

    International Nuclear Information System (INIS)

    Plante, J.

    1998-01-01

    Every 3 to 4 years, the NEA undertakes a study on projected costs of generating electricity in OECD countries. This started in 1983 and the last study (1997) has just be completed. All together 5 studies were performed, the first three dealing with nuclear and coal options, while the 1992 and 1997 included also the gas option. The goal of the study is to compare, country by country, generating costs of nuclear, coal-fired and gas-fired power plants that could be commissioned in the respondent countries by 2005-2010

  11. Natural gas and electric power, coordination to improve

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    1999-01-01

    In development of energy diversification strategy, so much in the use of available sources as in the supply of alternative to the final consumer, one comes advancing in Colombia, for several years, the national plan of gas overcrowding. The growing use of natural gas for the new projects of thermal generation has put in evidence the strong link and the existent dependence among of the gas and electric sub sectors. Such a nexus is manifested in four aspects: The electric power substitution for gas affects the demand of both products. The development of the production infrastructure and transport of the natural gas depends in a large part of the electric generation with gas. The costs of electric generation depend directly on the costs of the gas, included that of their transport. The regulation of the natural gas affects the costs of the electric power and vice versa. In this article the nexus and the coordination of both sectors are analyzed and they think about some actions to improve this last one

  12. Electric power in Canada 1992

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Electric power in Canada is given a comprehensive review by the Electricity Branch of the Department of Natural Resources Canada. The Electric Power Industry is scrutinized for electricity consumption, generation, trade and pricing across all of Canada. 98 tabs. 26 figs.

  13. Electric power in Canada 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Electric power in Canada is given a comprehensive review by the Electricity Branch of the Department of Natural Resources Canada. The Electric Power Industry is scrutinized for electricity consumption, generation, trade and pricing across all of Canada. 98 tabs. 26 figs

  14. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  15. Power project financing in the People's Republic of China

    International Nuclear Information System (INIS)

    Gomm, R.

    1998-01-01

    The current state of financing and security issues which in the past have constrained the amount of foreign investment and project financing in the electric power market in the Peoples Republic of China (PRC) are reviewed. Past impediments to foreign investment and financing of power projects revolved around the rate of return on investment, the difficulties of obtaining project approvals, conflict of interest issues wherein the Chinese power bureau could act in its interest as a contracted party rather than for the joint venture as an equity investor, and currency convertibility. Recent developments such as the new security law, the new electricity law, and new project financing regulations represent major improvements, but foreign investment and financing is still much less than originally anticipated, the potential of the PRC power market for foreign investments notwithstanding. (For example, in 1997, 13,500 MW of new generation capacity was added to the Chinese grid system. This increased the total installed capacity to 250,000 MW, making China the second largest installed capacity in the world.) Recent trends in the market and the likely future of foreign investment in the PRC are also discussed, the conclusion being that although the size of the IPP and project finance market in China is probably smaller than originally hoped, a sufficient proportion of new generation capacity has been allocated to foreign investors to ensure a steady stream of investment opportunities

  16. NASA's nuclear electric propulsion technology project

    International Nuclear Information System (INIS)

    Stone, J.R.; Sovey, J.S.

    1992-07-01

    The National Aeronautics and Space Administration (NASA) has initiated a program to establish the readiness of nuclear electric propulsion (NEP) technology for relatively near-term applications to outer planet robotic science missions with potential future evolution to system for piloted Mars vehicles. This program was initiated in 1991 with a very modest effort identified with nuclear thermal propulsion (NTP); however, NEP is also an integral part of this program and builds upon NASA's Base Research and Technology Program in power and electric propulsion as well as the SP-100 space nuclear power program. The NEP Program will establish the feasibility and practicality of electric propulsion for robotic and piloted solar system exploration. The performance objectives are high specific impulse (200 greater than I(sub sp) greater than 10000 s), high efficiency (over 0.50), and low specific mass. The planning for this program was initially focussed on piloted Mars missions, but has since been redirected to first focus on 100-kW class systems for relatively near-term robotic missions, with possible future evolution to megawatt-and multi-megawatt-class systems applicable to cargo vehicles supporting human missions as well as to the piloted vehicles. This paper reviews current plans and recent progress for the overall nuclear electric propulsion project and closely related activities. 33 refs

  17. Nuclear Power as an Option in Electrical Generation Planning for Small Economy and Electricity Grid

    International Nuclear Information System (INIS)

    Tomsic, Z.

    2012-01-01

    Implementing a NPP in countries with relatively small total GDP (small economy) and usually with small electricity grid face two major problems and constrains: the ability to obtain the considerable financial resources required on reasonable terms and to connect large NPP to small electricity grid. Nuclear generation financing in developing countries involves complex issues that need to be fully understood and dealt with by all the parties involved. The main topics covered by paper will be the: special circumstances related to the financing of NPP, costs and economic feasibility of NPP, conventional approaches for financing power generation projects in developing countries, alternative approaches for mobilizing financial resources. The safe and economic operation of a nuclear power plant (NPP) requires the plant to be connected to an electrical grid system that has adequate capacity for exporting the power from the NPP, and for providing a reliable electrical supply to the NPP for safe start-up, operation and normal or emergency shut-down of the plant. Connection of any large new power plant to the electrical grid system in a country may require significant modification and strengthening of the grid system, but for NPPs there may be added requirements to the structure of the grid system and the way it is controlled and maintained to ensure adequate reliability. Paper shows the comparative assesment of differrent base load technologies as an option in electrical generation planning for small economy and electricity grid.(author).

  18. 30 CFR 77.500 - Electric power circuits and electric equipment; deenergization.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric power circuits and electric equipment... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.500 Electric power circuits and electric equipment; deenergization. Power circuits and electric equipment shall be deenergized before work is done on...

  19. Electric power substations engineering

    CERN Document Server

    McDonald, John D

    2012-01-01

    The use of electric power substations in generation, transmission, and distribution remains one of the most challenging and exciting areas of electric power engineering. Recent technological developments have had a tremendous impact on all aspects of substation design and operation. With 80% of its chapters completely revised and two brand-new chapters on energy storage and Smart Grids, Electric Power Substations Engineering, Third Edition provides an extensive updated overview of substations, serving as a reference and guide for both industry and academia. Contributors have written each chapt

  20. The Effect of Wind Power on Electricity Prices in Denmark

    DEFF Research Database (Denmark)

    Jonsson, Tryggvi; Madsen, Henrik

    This report is the result of a special course taken by the author at IMM DTU under the guidance of professor Henrik Madsen. The aim of the project is to analyze the influence wind energy has on the electricity spot price in Western Denmark and investigate how information about wind power production...... can be used to model the electricity spot price. Various model types were tried, giving very different performance. Here, only the models that performed best are discussed in order to keep focus on the projects goal....

  1. Financing the electric power utilities, especially the nuclear power in Japan

    International Nuclear Information System (INIS)

    Tajima, T.

    1975-04-01

    Electric power demands in Japan have shown a remarkable growth at an annual rate of 12% since 1965. Nine electric power companies have invested large amounts of money so far, amounting to over 1 trillion yen every year since 1972. A survey of the electric power supply system and an estimation of the electric power demands in 1980 and in 1985 are given. It is expected that the main portion of electric power in the future will gradually be generated by nuclear plants. Financial features of the electrical power utilities, the credit risk of the electric power utilities, and the raising of funds by electric power utilities are discussed. It is concluded that it will be necessary (1) to expand the capital market, (2) to enable the electric power companies to issue a sufficient amount of bonds, (3) to make the Government financing institutions, such as the Japan Development Bank, provide the electric power companies with larger funds on a long-term and low-interest rate basis, and (4) even to take such drastic steps as subsidizing interest on private loans to the electric power companies. (B.P.)

  2. Summary of EPRI projects for improving power plant maintenance and maintainability

    International Nuclear Information System (INIS)

    Shugars, H.G.; Poole, D.N.; Pack, R.W.

    1979-01-01

    The Electric Power Research Institute is sponsoring projects to improve power plant maintenance and maintainability. Areas presently being emphasized are improvements in plant design for maintainability, improvements in performing nuclear plant refuelings, and development of on-line monitoring and diagnostic systems for various plant components. The seven projects are reviewed. They are: (1) human factors review of power plant maintainability; (2) refueling outage improvement; (3) on-line monitoring and diagnostics for power plant machinery; (4) acoustic emission and vibrati1on signature analysis of fossil fuel plant components; (5) acoustic monitoring of power plant valves; (6) on-line monitoring and diagnostics for generators; and (7) detection of water induction in steam turbines. Each project contractor and the project manager are listed for reference. 8 references

  3. Electric power annual 1997. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Electric Power Annual 1997, Volume 2 contains annual summary statistics at national, regional, and state levels for the electric power industry, including information on both electric utilities and nonutility power producers. Included are data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold; financial statistics; environmental statistics; power transactions; and demand-side management. Also included are data for US nonutility power producers on installed capacity; gross generation; emissions; and supply and disposition of energy. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts, and the general public with historical data that may be used in understanding US electricity markets. 15 figs., 62 tabs.

  4. The role of instrumentation and control systems in power uprating projects for nuclear power plants

    International Nuclear Information System (INIS)

    2008-01-01

    The IAEA's activities in nuclear power plant operating performance and life cycle management are aimed at increasing Member State capabilities in utilizing good engineering and management practices developed and transferred by the IAEA. In particular, the IAEA supports activities focusing on the improvement of nuclear power plant (NPP) performance, plant life management, training, power uprating, operational licence renewal, and the modernization of instrumentation and control (I and C) systems of NPPs in Member States. The subject of the I and C systems' role in power uprating projects in NPPs was suggested by the Technical Working Group on Nuclear Power Plant Control and Instrumentation in 2003. The subject was then approved by the IAEA and included in the programmes for 2004-2007. The increasing importance of power uprating projects can be attributed to the general worldwide tendency to the deregulation of the electricity market. The greater demand for electricity and the available capacity and safety margins, as well as the pressure from several operating NPPs resulted in requests for licence modification to enable operation at a higher power level, beyond the original licence provisions. A number of nuclear utilities have already gone through the uprating process for their nuclear reactors, and many more are planning to go through this modification process. In addition to mechanical and process equipment changes, parts of the electrical and I and C systems and components may also need to be altered to accommodate the new operating conditions and safety limits. This report addresses the role of I and C systems in NPP power uprating projects. The objective of the report is to provide guidance to utilities, safety analysts, regulators and others involved in the preparation, implementation and licensing of power uprating projects, with particular emphasis on the I and C aspects of these projects. As the average age of NPPs is increasing, it is becoming common for

  5. Investments and price formation in a liberalized electric power market. Appendices; Investering og prisdannelse pae et liberaliseret elmarked. Bilag

    Energy Technology Data Exchange (ETDEWEB)

    Morthorst, P.E.

    2005-05-01

    How will the electric power prices in the Nordic electric power market develop if the generation capacity in the coming 10 to 15 years is increased considerably? And what are the conditions for investors to initiate new investments in power plants? Briefly speaking - these are the issues for the project that is reported in this report. The basis for the project has been the Nordic electric power market model and its capability to handle the future extension of the necessary generating capacity. The main issue in the project has been a quantitative analysis of what the prices in the Nordic electric power market will be in the future, depending on the size of new investments in the power generating capacity. The appendix volume of the project report contains detailed descriptions of the three models that are used: the Balmorel model, the investment model, and the MARS model. The Balmorel model is a partial equilibrium model that describes a coherent, international electric power system and combined heat and power system. The model was developed in 2000 through international co-operation with the aim to have a model for analysing international aspects in the Baltic area. The investment model analyses and models the investment decisions in a liberalized Nordic electric power market. It is an exogenous model constructed outside the Balmorel model but uses the price pictures from the Balmorel model as input. MARS (MARket Simulation) is Eltra's (a Danish electric power transmission company) market model for simulating prices, production, demand and exchanges in the power market. The model covers the Nordic countries (Nord Pool) and Northern Germany. (LN)

  6. Assessment of projected temperature impacts from climate change on the U.S. electric power sector using the Integrated Planning Model®

    International Nuclear Information System (INIS)

    Jaglom, Wendy S.; McFarland, James R.; Colley, Michelle F.; Mack, Charlotte B.; Venkatesh, Boddu; Miller, Rawlings L.; Haydel, Juanita; Schultz, Peter A.; Perkins, Bill; Casola, Joseph H.; Martinich, Jeremy A.; Cross, Paul; Kolian, Michael J.; Kayin, Serpil

    2014-01-01

    This study analyzes the potential impacts of changes in temperature due to climate change on the U.S. power sector, measuring the energy, environmental, and economic impacts of power system changes due to temperature changes under two emissions trajectories—with and without emissions mitigation. It estimates the impact of temperature change on heating and cooling degree days, electricity demand, and generating unit output and efficiency. These effects are then integrated into a dispatch and capacity planning model to estimate impacts on investment decisions, emissions, system costs, and power prices for 32 U.S. regions. Without mitigation actions, total annual electricity production costs in 2050 are projected to increase 14% ($51 billion) because of greater cooling demand as compared to a control scenario without future temperature changes. For a scenario with global emissions mitigation, including a reduction in U.S. power sector emissions of 36% below 2005 levels in 2050, the increase in total annual electricity production costs is approximately the same as the increase in system costs to satisfy the increased demand associated with unmitigated rising temperatures. - Highlights: • We model the impact of rising temperatures on the U.S. power sector. • We examine temperature and mitigation impacts on demand, supply, and investment. • Higher temperatures increase power system costs by about $50 billion by the year 2050. • Meeting demand from higher temperatures costs slightly more than reducing emissions. • Mitigation policy cost analyses should account for temperature impacts

  7. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  8. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  9. Engineering for new-built nuclear power plant projects

    International Nuclear Information System (INIS)

    Gonzalez Lopez, A.

    2012-01-01

    This article reviews the opportunities existing in the market (electrical utilities and reactor vendors) for an engineering company with the profile of Empresarios Agrupados (EA) in new-built nuclear power plant projects. To do this, reference is made to some representative examples of projects in which EA has been participating recently. the article concludes sharing with the reader some lessons learned from this participation. (Author)

  10. Electricity, nuclear power and fuel cycle in OECD countries

    International Nuclear Information System (INIS)

    1988-01-01

    A questionnaire on Electricity Generation, Nuclear Power and Fuel Cycle Data is distributed annually to OECD Member Countries. In the questionnaire of January 1988, countries were asked to provide data for 1986 and 1987 and most likely projections up to the year 2005. The replies to the questionnaire (or estimates for unavailable data) are presented in this Booklet. Data for 1987 are provisional for several countries. The data on electricity generation and electric capacity are presented to the year 2005, and the data on fuel cycle services to the year 2000. The Addendum contains an analysis of the present and past projections for installed nuclear capacity to 2000. It shows the total capacity of those plants connected to the grid, under construction and firmly planned to be in operation in 2000 as 282 GWe. The new projection of 300 GWe is above this estimate, indicating that some countries are considering further expansion of their nuclear capacities within this time-frame [fr

  11. Tunisia- British gas intends to participate to the building of a combined cycle electric power plant

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Here is described the project to build a combined-cycle power plant in Tunisia, project in which the British Gas is interested. The transport, distribution, import and export of electricity should be controlled by the Tunisian society of electricity and gas. In the context of an agreement with Gec-Alsthom, the british company hopes to offer to build, and exploit the future power plant. (N.C.)

  12. The Nikola project intelligent electric vehicle integration

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Marinelli, Mattia; Olesen, Ole Jan

    2014-01-01

    The electric vehicle (EV) has certain properties that elevate its relevance to the smart grid. If EV integration is to meet its potential in supporting an economic and secure power system and at the same time lower the operating costs for the owner, it is necessary to thoroughly and systematically...... investigate the value-adding services that an EV may provide. The Danish Nikola project defines EV services as the act of influencing the timing, rate and direction of the power and energy exchanged between the EV battery and the grid to yield benefits for user, system, and society. This paper describes...

  13. Dynamics of global supply chain and electric power networks: Models, pricing analysis, and computations

    Science.gov (United States)

    Matsypura, Dmytro

    In this dissertation, I develop a new theoretical framework for the modeling, pricing analysis, and computation of solutions to electric power supply chains with power generators, suppliers, transmission service providers, and the inclusion of consumer demands. In particular, I advocate the application of finite-dimensional variational inequality theory, projected dynamical systems theory, game theory, network theory, and other tools that have been recently proposed for the modeling and analysis of supply chain networks (cf. Nagurney (2006)) to electric power markets. This dissertation contributes to the extant literature on the modeling, analysis, and solution of supply chain networks, including global supply chains, in general, and electric power supply chains, in particular, in the following ways. It develops a theoretical framework for modeling, pricing analysis, and computation of electric power flows/transactions in electric power systems using the rationale for supply chain analysis. The models developed include both static and dynamic ones. The dissertation also adds a new dimension to the methodology of the theory of projected dynamical systems by proving that, irrespective of the speeds of adjustment, the equilibrium of the system remains the same. Finally, I include alternative fuel suppliers, along with their behavior into the supply chain modeling and analysis framework. This dissertation has strong practical implications. In an era in which technology and globalization, coupled with increasing risk and uncertainty, complicate electricity demand and supply within and between nations, the successful management of electric power systems and pricing become increasingly pressing topics with relevance not only for economic prosperity but also national security. This dissertation addresses such related topics by providing models, pricing tools, and algorithms for decentralized electric power supply chains. This dissertation is based heavily on the following

  14. Electric power annual 1995. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This document summarizes pertinent statistics on various aspects of the U.S. electric power industry for the year and includes a graphic presentation. Data is included on electric utility retail sales and revenues, financial statistics, environmental statistics of electric utilities, demand-side management, electric power transactions, and non-utility power producers.

  15. Mini hydro electric power stations Lukar 1,2,3,4: Public enterprise (JP) Komunalec

    International Nuclear Information System (INIS)

    Stojanova, Blagica

    2004-01-01

    The role of the Public enterprises in improving entire living conditions of the citizens, not only by its services towards the citizenship such as: water supplying and public hygiene but the opportunity to produce the electric power by the Mini hydro electric-power stations built on the main city water supply pipes. The paper presents experiences of building the mini hydro electric power stations Lukar 1,2,3,4. The successful completion of this project should be a motivation for building more electric power stations because there are great water potential in the Republic of Macedonia i.e. there have been recorded more than a hundred places suitable for construction of power electric stations. This will contribute not only for clean ecological energy but will have a direct influence on the total economic development of the Republic of Macedonia. (Author)

  16. Power Requirements Determined for High-Power-Density Electric Motors for Electric Aircraft Propulsion

    Science.gov (United States)

    Johnson, Dexter; Brown, Gerald V.

    2005-01-01

    Future advanced aircraft fueled by hydrogen are being developed to use electric drive systems instead of gas turbine engines for propulsion. Current conventional electric motor power densities cannot match those of today s gas turbine aircraft engines. However, if significant technological advances could be made in high-power-density motor development, the benefits of an electric propulsion system, such as the reduction of harmful emissions, could be realized.

  17. Energy, Electricity and Nuclear Power Estimates for the Period up to 2050. 2010 Ed

    International Nuclear Information System (INIS)

    2010-01-01

    Reference Data Series No. 1 (RDS-1) is an annual publication - currently in its thirtieth edition - containing estimates of energy, electricity and nuclear power trends up to the year 2050. RDS-1 starts with a summary of the situation of nuclear power in IAEA Member States as of the end of 2009. The data on nuclear power are based on actual statistical data collected by the IAEA's Power Reactor Information System (PRIS). Energy and electricity data for 2009, however, are estimated, since the latest available information from the United Nations Department of Economic and Social Affairs is for 2007. Population data originate from the World Population Prospects (2008 revision), published by the Population Division of the United Nations Department of Economic and Social Affairs, and the 2009 values again are estimates. As in the past, projections of future needs of energy, electricity and nuclear power are presented as low and high estimates encompassing the inherent uncertainties involved in projecting trends. The RDS-1 estimates should be viewed as very general growth trends whose validity must be constantly subjected to critical review. Beginning with the 30th edition of this publication, however, the end-point of the estimates is extended up to the year 2050 (instead of 2030). Looking beyond 2030 is prompted by the interest expressed by numerous Member States currently without nuclear power in adding nuclear energy to their future national energy supply mixes. Given the lead times in planning and implementing nuclear power programmes, a fair share of these are likely to result in actual plant commissioning and grid connection after 2030. Many international, national and private organizations routinely engage in energy demand and supply projections, including nuclear power. These projections are based on a multitude of different assumptions and aggregating procedures, which make a straightforward comparison and synthesis very difficult. The basic differences refer

  18. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  19. Power monitoring and control for large scale projects: SKA, a case study

    Science.gov (United States)

    Barbosa, Domingos; Barraca, João. Paulo; Maia, Dalmiro; Carvalho, Bruno; Vieira, Jorge; Swart, Paul; Le Roux, Gerhard; Natarajan, Swaminathan; van Ardenne, Arnold; Seca, Luis

    2016-07-01

    Large sensor-based science infrastructures for radio astronomy like the SKA will be among the most intensive datadriven projects in the world, facing very high demanding computation, storage, management, and above all power demands. The geographically wide distribution of the SKA and its associated processing requirements in the form of tailored High Performance Computing (HPC) facilities, require a Greener approach towards the Information and Communications Technologies (ICT) adopted for the data processing to enable operational compliance to potentially strict power budgets. Addressing the reduction of electricity costs, improve system power monitoring and the generation and management of electricity at system level is paramount to avoid future inefficiencies and higher costs and enable fulfillments of Key Science Cases. Here we outline major characteristics and innovation approaches to address power efficiency and long-term power sustainability for radio astronomy projects, focusing on Green ICT for science and Smart power monitoring and control.

  20. Electric power annual 1995. Volume I

    International Nuclear Information System (INIS)

    1996-07-01

    The Electric Power Annual presents a summary of electric power industry statistics at national, regional, and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts, and the general public with data that may be used in understanding U.S. electricity markets. The Electric Power Annual is prepared by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); U.S. Department of Energy. In the private sector, the majority of the users of the Electric Power Annual are researchers and analysts and, ultimately, individuals with policy- and decisionmaking responsibilities in electric utility companies. Financial and investment institutions, economic development organizations interested in new power plant construction, special interest groups, lobbyists, electric power associations, and the news media will find data in the Electric Power Annual useful. In the public sector, users include analysts, researchers, statisticians, and other professionals with regulatory, policy, and program responsibilities for Federal, State, and local governments. The Congress and other legislative bodies may also be interested in general trends related to electricity at State and national levels. Much of the data in these reports can be used in analytic studies to evaluate new legislation. Public service commissions and other special government groups share an interest in State-level statistics. These groups can also compare the statistics for their States with those of other jurisdictions

  1. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Science.gov (United States)

    2010-02-05

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for...

  2. Restructured electric power systems analysis of electricity markets with equilibrium models

    CERN Document Server

    2010-01-01

    Electricity market deregulation is driving the power energy production from a monopolistic structure into a competitive market environment. The development of electricity markets has necessitated the need to analyze market behavior and power. Restructured Electric Power Systems reviews the latest developments in electricity market equilibrium models and discusses the application of such models in the practical analysis and assessment of electricity markets.

  3. Proceedings of Wireless Technology in the Electric Power Industry Workshop

    International Nuclear Information System (INIS)

    2001-01-01

    A one-day workshop was conducted at EPRI Charlotte to identify technology issues related to wireless technology in nuclear power plants. The meeting concluded with a roundtable discussion to determine what projects could be conducted to address opportunities and gaps in this technology; the three projects recommended for further investigation were a risk analysis, development of a technology strategy, and development of guidelines for reliable implementation of wireless technologies. The Proceedings CD includes workshop presentations in PowerPoint format. The presentations cover the following topics: (1) Wireless Project at TXU: Integration of Voice, Data, and Video; (2) Radio Upgrade Project at Public Service Electric and Gas Company (PSE and G) of New Jersey; and (3) Operational Experience with Wireless Communication at Nuclear Plants

  4. Impacts on irrigated agriculture of changes in electricity costs resulting from Western Area Power Administration's power marketing alternatives

    International Nuclear Information System (INIS)

    Edwards, B.K.; Flaim, S.J.; Howitt, R.E.; Palmer, S.C.

    1995-03-01

    Irrigation is a major factor in the growth of US agricultural productivity, especially in western states, which account for more than 85% of the nation's irrigated acreage. In some of these states, almost all cropland is irrigated, and nearly 50% of the irrigation is done with electrically powered pumps. Therefore, even small increases in the cost of electricity could have a disproportionate impact on irrigated agriculture. This technical memorandum examines the impacts that could result from proposed changes in the power marketing programs of the Western Area Power Administration's Salt Lake City Area Office. The changes could increase the cost of power to all Western customers, including rural municipalities and irrigation districts that rely on inexpensive federal power to pump water. The impacts are assessed by translating changes in Western's wholesale power rate into changes in the cost of pumping water as an input for agricultural production. Farmers can adapt to higher electricity prices in many ways, such as (1) using different pumping fuels, (2) adding workers and increasing management to irrigate more efficiently, and (3) growing more drought-tolerant crops. This study projects several responses, including using less groundwater and planting fewer waterintensive crops. The study finds that when dependence on Western's power is high, the cost of power can have a major effect on energy use, agricultural practices, and the distribution of planted acreage. The biggest percentage changes in farm income would occur (1) in Nevada and Utah (however, all projected changes are less than 2% of the baseline) and (2) under the marketing alternatives that represent the lowest capacity and energy offer considered in Western's Electric Power Marketing Environmental Impact Statement. The aggregate impact on farm incomes and the value of total farm production would be much smaller than that suggested by the changes in water use and planted acreage

  5. Projecting Electricity Demand in 2050

    Energy Technology Data Exchange (ETDEWEB)

    Hostick, Donna J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Belzer, David B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Markel, Tony [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kintner-Meyer, Michael C. W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-07-01

    This paper describes the development of end-use electricity projections and load curves that were developed for the Renewable Electricity (RE) Futures Study (hereafter RE Futures), which explored the prospect of higher percentages (30% - 90%) of total electricity generation that could be supplied by renewable sources in the United States. As input to RE Futures, two projections of electricity demand were produced representing reasonable upper and lower bounds of electricity demand out to 2050. The electric sector models used in RE Futures required underlying load profiles, so RE Futures also produced load profile data in two formats: 8760 hourly data for the year 2050 for the GridView model, and in 2-year increments for 17 time slices as input to the Regional Energy Deployment System (ReEDS) model. The process for developing demand projections and load profiles involved three steps: discussion regarding the scenario approach and general assumptions, literature reviews to determine readily available data, and development of the demand curves and load profiles.

  6. Electric power: Past, present, and future

    International Nuclear Information System (INIS)

    Schnetzer, H.

    1994-01-01

    When, at the turn of the century, public electric power supply facilities were created and in 1908, the electric power stations of the Swiss canton of Zurich (EKZ) were built, only a third of the communities in the Zurich area could boast about being the consumers of this new energy. But what did the first electrically powered devices and machines look like? This, and more, is presented in the ''electric power house'' in Burenwisen Glattfelden in the canton of Zurich. Besides a Kaplan turbine and a sample of the most interesting devices from the past and the present, the focus of the exhibition is on the presentation of the new and old sources of light. The EKZ are pleased to be able to present their ''electric power house'' to the public, providing a broad range of information on energy-related questions and the development of electric power supply. (orig.) [de

  7. Distributed power in Afghanistan: The Padisaw micro-hydro project

    International Nuclear Information System (INIS)

    Hallett, Michael

    2009-01-01

    The provision of electricity is a vital need in reconstruction and development situations, like that in Afghanistan. Indeed, according to the Afghan government's Afghan National Development Strategy (ANDS) the need for electricity featured in 80% of the Provincial Development Plans as a top priority. With the help of the International Community, the government of Afghanistan is attempting to develop a new market oriented approach to the nationwide provision of electrical power. Although the bulk of the electrification effort is directed toward large scale construction of a national grid, the ANDS explicitly mentions a role for 'micro-hydro, solar, waste and small scale diesel power and energy generating sources'. This article will describe a micro-hydro project in Padisaw village, in the Nurgaram district of Nuristan province located in Northeastern Afghanistan and the role Provincial Reconstruction Team played in working with the local community through the project planning and building processes and offer some observation on how, as the Afghan National Development Strategy is executed, the private sector can play an increasingly significant role in the Afghan distributed energy arena. (author)

  8. Electric power statistics from independence to establishment

    International Nuclear Information System (INIS)

    1997-02-01

    This paper reports power statistics from independence to establishment pf KEPIC. It has the lists of electricity industry, electric equipment on the whole country power equipment at the independence and development of power facility, power generation about merit of power plants, demand according to types and use, power loss, charge for electric power distribution, power generation and generating cost, financial lists on income measurement and financing, meteorological phenomena and amount of rainfall electric power development, international statistics on major countries power generation and compare power rates with general price.

  9. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    Energy Technology Data Exchange (ETDEWEB)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage

  10. POWERCO, Nuclear Power Plant Electricity Cost and Economics

    International Nuclear Information System (INIS)

    Tyson, Frank D.

    1982-01-01

    1 - Description of problem or function: POWERCO calculates the cost of electricity produced by nuclear power stations, assuming all cash expenses such as investment and fuel costs, operating expenses, and taxes are known. The power cost is held constant throughout the project life. 2 - Method of solution: The cost calculation is based on the requirement that income received must provide for recovery of investment, return on investment, and all operating expenses. Equations are developed to calculate true fixed charge rates and true average fuel working capital

  11. Electrical Power Systems for NASA's Space Transportation Program

    Science.gov (United States)

    Lollar, Louis F.; Maus, Louis C.

    1998-01-01

    Marshall Space Flight Center (MSFC) is the National Aeronautics and Space Administration's (NASA) lead center for space transportation systems development. These systems include earth to orbit launch vehicles, as well as vehicles for orbital transfer and deep space missions. The tasks for these systems include research, technology maturation, design, development, and integration of space transportation and propulsion systems. One of the key elements in any transportation system is the electrical power system (EPS). Every transportation system has to have some form of electrical power and the EPS for each of these systems tends to be as varied and unique as the missions they are supporting. The Preliminary Design Office (PD) at MSFC is tasked to perform feasibility analyses and preliminary design studies for new projects, particularly in the space transportation systems area. All major subsystems, including electrical power, are included in each of these studies. Three example systems being evaluated in PD at this time are the Liquid Fly Back Booster (LFBB) system, the Human Mission to Mars (HMM) study, and a tether based flight experiment called the Propulsive Small Expendable Deployer System (ProSEDS). These three systems are in various stages of definition in the study phase.

  12. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  13. Electric power annual 1997. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Electric Power Annual presents a summary of electric power industry statistics at national, regional, and State levels. The objective of the publication is to provide industry decisionmakers, government policy-makers, analysts, and the general public with data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. Volume 1 -- with a focus on US electric utilities -- contains final 1997 data on net generation and fossil fuel consumption, stocks, receipts, and cost; preliminary 1997 data on generating unit capability, and retail sales of electricity, associated revenue, and the average revenue per kilowatthour of electricity sold (based on a monthly sample: Form EIA-826, ``Monthly Electric Utility Sales and Revenue Report with State Distributions``). Additionally, information on net generation from renewable energy sources and on the associated generating capability is included in Volume 1 of the EPA.

  14. 75 FR 61414 - Basin Electric Power Cooperative: South Dakota PrairieWinds Project

    Science.gov (United States)

    2010-10-05

    ... renewable energy goals. The resources or environmental factors that could be affected by the proposed... purpose and need, Basin Electric identified construction of the proposed Project as its best course of... environmental factors (e.g., soils, topography and geology, water resources, air quality, biological resources...

  15. Economics of generating electricity from nuclear power

    International Nuclear Information System (INIS)

    Boadu, H.O.

    2001-01-01

    The paper reviews and compares experiences and projected future construction and electricity generation costs for nuclear and fossil fired power plants. On the basis of actual operating experience, nuclear power has been demonstrated to be economically competitive with other base load generation options, and international studies project that this economic competitiveness will be largely maintained in the future, over a range of conditions and in a number of countries. However, retaining and improving this competitive position requires concerted efforts to ensure that nuclear plants are constructed within schedule and budgets, and are operated reliably and efficiently. Relevant cost impacting factors is identified, and conclusions for successful nuclear power plant construction and operation are drawn. The desire to attain sustainable development with balanced resource use and control of the environmental and climate impacts of energy systems could lead to renewed interest in nuclear power as an energy source that does not emit greenhouse gases, thus contributing to a revival of the nuclear option. In this regard, mitigation of emissions from fossil-fuelled power plants could lead to restrictions of fossil fuel use and/or result in higher costs of fossil based generation, thus improving the economic competitiveness of nuclear power (au)

  16. Energy, Electricity and Nuclear Power Estimates for the Period up to 2050. 2017 Ed

    International Nuclear Information System (INIS)

    2017-01-01

    Reference Data Series No. 1 (RDS-1) is an annual publication — currently in its thirty-seventh edition — containing estimates of energy, electricity and nuclear power trends up to the year 2050. RDS-1 starts with a summary of the status of nuclear power in IAEA Member States as of the end of 2016 based on statistical data collected by the IAEA’s Power Reactor Information System (PRIS). It then presents estimates of energy and electricity up to 2050 derived from various international studies, including the International Energy Agency’s World Energy Outlook 2016 and the United States Energy Information Administration’s International Energy Outlook 2016. The energy and electricity data for 2016 are estimated, as the latest information available from the United Nations Department of Economic and Social Affairs is for 2014. Population data originate from World Population Prospects (2015 revision), published by the Population Division of the United Nations Department of Economic and Social Affairs. The 2016 values again are estimates. As in previous editions of RDS-1, projections of nuclear power are presented as low and high estimates encompassing the uncertainties inherent in projecting trends. The projections are based on a critical review of (i) the global and regional energy, electricity and nuclear power projections made by other international organizations, (ii) national projections supplied by individual countries for a recent OECD Nuclear Energy Agency study and (iii) the estimates of the expert group participating in the IAEA’s yearly consultancy on nuclear capacity projections. The low and high estimates reflect contrasting, but not extreme, underlying assumptions on the different driving factors that have an impact on nuclear power deployment. These factors, and the ways they might evolve, vary from country to country. The estimates presented provide a plausible range of nuclear capacity growth by region and worldwide. They are not intended to be

  17. Wind-powered electrical systems : highway rest areas, weigh stations, and team section buildings.

    Science.gov (United States)

    2009-02-01

    This project considered the use of wind for providing electrical power at Illinois Department of Transportation : (IDOT) highway rest areas, weigh stations, and team section buildings. The goal of the project was to determine : the extent to which wi...

  18. A High-power Electric Propulsion Test Platform in Space

    Science.gov (United States)

    Petro, Andrew J.; Reed, Brian; Chavers, D. Greg; Sarmiento, Charles; Cenci, Susanna; Lemmons, Neil

    2005-01-01

    This paper will describe the results of the preliminary phase of a NASA design study for a facility to test high-power electric propulsion systems in space. The results of this design study are intended to provide a firm foundation for subsequent detailed design and development activities leading to the deployment of a valuable space facility. The NASA Exploration Systems Mission Directorate is sponsoring this design project. A team from the NASA Johnson Space Center, Glenn Research Center, the Marshall Space Flight Center and the International Space Station Program Office is conducting the project. The test facility is intended for a broad range of users including government, industry and universities. International participation is encouraged. The objectives for human and robotic exploration of space can be accomplished affordably, safely and effectively with high-power electric propulsion systems. But, as thruster power levels rise to the hundreds of kilowatts and up to megawatts, their testing will pose stringent and expensive demands on existing Earth-based vacuum facilities. These considerations and the human access to near-Earth space provided by the International Space Station (ISS) have led to a renewed interest in space testing. The ISS could provide an excellent platform for a space-based test facility with the continuous vacuum conditions of the natural space environment and no chamber walls to modify the open boundary conditions of the propulsion system exhaust. The test platform could take advantage of the continuous vacuum conditions of the natural space environment. Space testing would provide open boundary conditions without walls, micro-gravity and a realistic thermal environment. Testing on the ISS would allow for direct observation of the test unit, exhaust plume and space-plasma interactions. When necessary, intervention by on-board personnel and post-test inspection would be possible. The ISS can provide electrical power, a location for

  19. Energy, Electricity and Nuclear Power Estimates for the Period up to 2050. 2016 Ed

    International Nuclear Information System (INIS)

    2016-01-01

    Reference Data Series No. 1 (RDS-1) is an annual publication — currently in its thirty-sixth edition — containing estimates of energy, electricity and nuclear power trends up to the year 2050. RDS-1 starts with a summary of the situation of nuclear power in IAEA Member States as of the end of 2015. The data on nuclear power presented in Tables 1 and 2 are based on actual statistical data collected by the IAEA’s Power Reactor Information System (PRIS). However, energy and electricity data for 2015 are estimated, as the latest information available from the United Nations Department of Economic and Social Affairs is for 2013. Population data originate from the World Population Prospects (2012 revision), published by the Population Division of the United Nations Department of Economic and Social Affairs. The 2015 values again are estimates. As in previous editions, projections of future energy and electricity demand and the role of nuclear power are presented as low and high estimates encompassing the inherent uncertainties involved in projecting trends. The RDS-1 estimates should be viewed as very general growth trends whose validity must be constantly subjected to critical review. Many international, national and private organizations routinely engage in energy demand and supply projections, including projections for nuclear power. These projections are based on a multitude of different assumptions and aggregating procedures, making a straightforward comparison and synthesis very difficult. The basic differences relate to such fundamental input assumptions as: • Economic growth; • Correlation of economic growth and energy use; • Technology performance and costs; • Energy resource availability and future fuel prices; •• Energy policy and physical, environmental and economic constraints

  20. Electric Power Monthly, March 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and state level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data are presented on generation, fuel consumption, stockpiles, costs, sales, and unusual occurrences. Fuels considered are: coal, petroleum, natural gas, nuclear power, and hydroelectric power. 4 figs., 48 tabs

  1. Electric power conservation in Brazil

    International Nuclear Information System (INIS)

    Hollanda, J.B. de

    1989-01-01

    The Brazilian Electric Power Conservation Program (PROCEL) is discussed. The main objective of this program is the optimization of electric power use, including consideration about prices, technology development and legislation. (M.V.M.)

  2. Electric power distribution handbook

    CERN Document Server

    Short, Thomas Allen

    2014-01-01

    Of the ""big three"" components of electrical infrastructure, distribution typically gets the least attention. In fact, a thorough, up-to-date treatment of the subject hasn't been published in years, yet deregulation and technical changes have increased the need for better information. Filling this void, the Electric Power Distribution Handbook delivers comprehensive, cutting-edge coverage of the electrical aspects of power distribution systems. The first few chapters of this pragmatic guidebook focus on equipment-oriented information and applications such as choosing transformer connections,

  3. Electric Power annual 1996: Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document presents a summary of electric power industry statistics. Data are included on electric utility retail sales of electricity, revenues, environmental information, power transactions, emissions, and demand-side management.

  4. 30 CFR 75.509 - Electric power circuit and electric equipment; deenergization.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric power circuit and electric equipment... LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.509 Electric power circuit and electric equipment; deenergization. [Statutory Provisions] All...

  5. Summary evaluation e-NV200 'Power to Amsterdam' project : February - June 2015

    NARCIS (Netherlands)

    Balm, Susanne; Spoelstra, Jop; van Holstein, Leigh; Moser, Thijs; van Kollem, Wouter

    2015-01-01

    In the Netherlands, the automobile manufacturer Nissan has initiated a unique project to stimulate the uptake of electric vehicles (EV) for commercial usage. This project is called “Power to Amsterdam” and started by the end of 2014. In the project, Nissan has enabled entrepreneurs in the region of

  6. Energy, Electricity and Nuclear Power Estimates for the Period up to 2050. 2013 Ed

    International Nuclear Information System (INIS)

    2013-01-01

    Reference Data Series No. 1 (RDS-1) is an annual publication - currently in its thirty-third edition - containing estimates of energy, electricity and nuclear power trends up to the year 2050. RDS-1 starts with a summary of the situation of nuclear power in IAEA Member States as of the end of 2012. The data on nuclear power presented are based on actual statistical data collected by the IAEA's power Reactor Information System (PRIS). However, energy and electricity data for 2012 are estimated, as the latest information available from the united Nations Department of Economic and Social Affairs is for 2010 only. Population data originate from the world population prospects (2010 revision), published by the population Division of the united Nations Department of Economic and Social Affairs. The 2012 values again are estimates. As in previous editions, projections of future energy and electricity demand and the role of nuclear power are presented as low and high estimates encompassing the inherent uncertainties involved in projecting trends. The RDS-1 estimates should be viewed as very general growth trends whose validity must be constantly subjected to critical review. Many international, national and private organizations routinely engage in energy demand and supply projections, including nuclear power. These projections are based on a multitude of different assumptions and aggregating procedures, which make a straightforward comparison and synthesis very difficult. The basic differences refer to such fundamental input assumptions as: - Economic growth; - Correlation of economic growth and energy use; - Technology performance and costs; - Energy resource availability and future fuel prices; - Energy policy and physical, environmental and economic constraints

  7. The Sydvaerme project: District heating from the Barsebeck nuclear power plant

    International Nuclear Information System (INIS)

    Josefsson, L.

    1977-01-01

    The paper presents a summary report of a study on district heating from Barsebeck Nuclear Power Plant in Sweden, prepared cooperatively by the cities of Malmoe, Lund, Helsingborg, Landskrona and the electric power company Sydkraft. A future number 3 generating set at the Barsebeck nuclear power station could be designed for combined production of heat and electric power. The generating set could be completed after 1983, and could then supply about 65% of total district heating requirements. The first stage of the investigation includes a proposal for a technically feasible solution, sufficiently detailed to permit both technical and economic evaluation of the project. (author)

  8. Project W-320, 241-C-106 sluicing electrical calculations, Volume 2

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system

  9. Thermophotovoltaic Arrays for Electrical Power Generation

    International Nuclear Information System (INIS)

    Sarnoff Corporation

    2003-01-01

    Sarnoff has designed an integrated array of thermophotovoltaic (TPV) cells based on the In(Al)GaAsSb/GaSb materials system. These arrays will be used in a system to generate electrical power from a radioisotope heat source that radiates at temperatures from 700 to 1000 C. Two arrays sandwich the slab heat source and will be connected in series to build voltage. Between the arrays and the heat source is a spectral control filter that transmits above-bandgap radiation and reflects below-bandgap radiation. The goal is to generate 5 mW of electrical power at 3 V from a 700 C radiant source. Sarnoff is a leader in antimonide-based TPV cell development. InGaAsSb cells with a bandgap of 0.53 eV have operated at system conversion efficiencies greater than 17%. The system included a front-surface filter, and a 905 C radiation source. The cells were grown via organo-metallic vapor-phase epitaxy. Sarnoff will bring this experience to bear on the proposed project. The authors first describe array and cell architecture. They then present calculated results showing that about 80 mW of power can be obtained from a 700 C radiator. Using a conservative array design, a 5-V output is possible

  10. Energy system, electricity market and economic studies on increasing nuclear power capacity

    International Nuclear Information System (INIS)

    Forsstrom, J.; Pursiheimo, E.; Kekkonen, V.; Honkatukia, J.

    2010-04-01

    Objective of this research project is to examine effects of addition of nuclear capacity from three different angles by using energy system, electricity market and economic analysis. In each area the analysis is based on computational methods. Finland is a member of Nordic electricity market which is further connected to networks of Continental Europe and Russia. Due to the foreign connections Finland has been able to import inexpensive electricity from its neighboring countries and this state is expected to continue. Addition of nuclear capacity lowers electricity import demand, affects level of electricity price decreasingly and decreases shortfall of installed production capacity. Substantial additions of nuclear power capacity and generous import supply have disadvantageous effect on profitability of combined heat and power production. The development of import possibilities depends on progression of difficult-to-estimate balance between electricity consumption and production in the neighboring countries. Investments on nuclear power increase national product during the construction phase. Growth of employment is also rather significant, especially during the construction phase. In the long term permanent jobs will be created too. Increase of employment is held back by increasing real wages, but it is though evident that consumer purchasing power is improved due to these nuclear power developments. (orig.)

  11. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg. Previously announced in STAR as N83-24764

  12. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg.

  13. Optimization and Control of Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C. [Univ. of Wisconsin, Madison, WI (United States); Molzahn, Daniel K. [Univ. of Wisconsin, Madison, WI (United States)

    2014-10-17

    The analysis and optimization needs for planning and operation of the electric power system are challenging due to the scale and the form of model representations. The connected network spans the continent and the mathematical models are inherently nonlinear. Traditionally, computational limits have necessitated the use of very simplified models for grid analysis, and this has resulted in either less secure operation, or less efficient operation, or both. The research conducted in this project advances techniques for power system optimization problems that will enhance reliable and efficient operation. The results of this work appear in numerous publications and address different application problems include optimal power flow (OPF), unit commitment, demand response, reliability margins, planning, transmission expansion, as well as general tools and algorithms.

  14. Study on Stochastic Optimal Electric Power Procurement Strategies with Uncertain Market Prices

    Science.gov (United States)

    Sakchai, Siripatanakulkhajorn; Saisho, Yuichi; Fujii, Yasumasa; Yamaji, Kenji

    The player in deregulated electricity markets can be categorized into three groups of GENCO (Generator Companies), TRNASCO (Transmission Companies), DISCO (Distribution Companies). This research focuses on the role of Distribution Companies, which purchase electricity from market at randomly fluctuating prices, and provide it to their customers at given fixed prices. Therefore Distribution companies have to take the risk stemming from price fluctuation of electricity instead of the customers. This entails the necessity to develop a certain method to make an optimal strategy for electricity procurement. In such a circumstance, this research has the purpose for proposing the mathematical method based on stochastic dynamic programming to evaluate the value of a long-term bilateral contract of electricity trade, and also a project of combination of the bilateral contract and power generation with their own generators for procuring electric power in deregulated market.

  15. Highlights of Electric Power Industry in China

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    @@Reform and Development of Electric Power Management Before 1978, China's electric power industry,managed by the Central Government, was a vertically monopoly sector. Along with China's reformation of economy structure started in 1978, electric power industry has step on its road of restructuring and deregulation. Up to now administration of China's electric power industry underwent following reciprocative changes:

  16. Electric power: the liberalization effects

    International Nuclear Information System (INIS)

    Carpentier, J.

    1999-01-01

    Nine months after the beginning of the deregulation of electric power markets in Europe, the first effects are being felt: fall of prices, amalgamation of electric power companies, development of new technologies and unemployment. (O.M.)

  17. Economic impact analysis of independent power projects in British Columbia

    International Nuclear Information System (INIS)

    2009-12-01

    Independent power producer (IPP) projects have been active in British Columbia's (BC) regulated electricity market since the late 1980s. The 49 IPP projects developed in the province currently account for approximately 10 per cent of BC's electricity generation, and IPP development continues to expand in nearly every region. This study presented an economic impact analysis of IPP projects in BC. The economic impacts of IPP projects were divided into 2 categories: (1) existing IPP projects, and (2) potential IPP projects. The study showed that the total power potential supplied by BC IPP projects would increase from a current level of 5940 annual GWh to approximately 14,149 GWh. BC could also be generating a further 21,321 GWh of annual output to service demand domestically in addition to exporting to the United States. The value of capital investment in existing IPPs across BC was estimated at $2.8 billion. Capital investment in potential IPPs was estimated at $26.1 billion in 2009 constant dollars. Government revenues generated through the construction phase of potential IPP projects were estimated at $1.6 billion. IPP projects are expected to have a significant impact on First Nations groups, contribute to provincial energy self-sufficiency, and have little to no greenhouse gas (GHG) emissions. 25 refs., 19 tabs., 24 figs.

  18. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  19. Experience of electric power conservation in COELBA (Bahia Electric Company)

    International Nuclear Information System (INIS)

    Bastos, A.C.F.

    1990-01-01

    The electric power crisis of Brazilian north-east in 1987 imposes the Bahia Electric Company-COELBA to management a electric power conservation. The institutional, organizational and operational aspects are presented, including the tariff system, the market, the consumption and the relation with public. (author)

  20. Impact Study on Power Factor of Electrical Load in Power Distribution System

    International Nuclear Information System (INIS)

    Syirrazie Che Soh; Harzawardi Hasim; Ahmad Asraf, A.S.

    2014-01-01

    Low Power Factor of electrical loads cause high current is drawn from power supply. The impact of this circumstance is influenced by impedance of electrical load. Therefore, the key consideration of this study is how impedance of electrical loads influence power factor of electrical loads, and then power distribution as the whole. This study is important to evaluate the right action to mitigate low power factor effectively for electrical energy efficiency purpose. (author)

  1. 33 CFR 127.107 - Electrical power systems.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Electrical power systems. 127.107... Waterfront Facilities Handling Liquefied Natural Gas § 127.107 Electrical power systems. (a) The electrical power system must have a power source and a separate emergency power source, so that failure of one...

  2. Electric Vehicles in Power Systems with 50% Wind Power Penetration

    DEFF Research Database (Denmark)

    Østergaard, Jacob; Foosnæs, Anders; Xu, Zhao

    2009-01-01

    will be an important balancing measure to enable the Danish government’s energy strategy, which implies 50% wind power penetration in the electric power system. An EV will be a storage device for smoothing power fluctuations from renewable resources especially wind power and provide valuable system services...... for a reliable power system operation. Cost-benefit analysis shows that intelligent bidirectional charging – vehicle to grid (V2G) – provides a socio-economic profit of 150 million Euro/year in the Danish electric power system in 2025 assuming that 15% of the Danish road transport need is supplied by electricity....... This paper analyse the potential for using EVs in Denmark and identify the benefits of the electric power system with high wind power generation by intelligent charging of the EVs. Based on the analysis important technology gabs are identified, and the corresponding research and development initiatives...

  3. Wind energy generation for electric power production, preliminary studies. Part I

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, A

    1976-03-01

    Studies of wind power generation done by SAAB-Scania during 1975 are described. The project deals with generation of electricity for delivery to the transmission system. Both plants with horizontal axis and plants with vertical axis have been studied. A projected pilot plant with a rotor of 18 meter and an effect of 50 kW at 10 m/s wind velocity is described. Suggestions are made for a continuation of the project.

  4. Sustainable model for financial viability of decentralized biomass gasifier based power projects

    NARCIS (Netherlands)

    Palit, D.; Malhotra, R.; Kumar, Atul

    2011-01-01

    This paper made a modest attempt for designing a sustainable model for financial viability of biomass gasifier power projects for enhancing electricity access in India and other developing countries. For long term sustainability of distributed generation projects in remote rural areas, viability

  5. Generating electric power for export from Atlantic Canada to the U.S

    International Nuclear Information System (INIS)

    Valentine, H.

    2009-01-01

    Hydroelectric power from Newfoundland-Labrador and Quebec has been imported to the northeastern United States for many years. Newfoundland's government has recently declared its intention to develop a Lower Churchill Falls hydroelectric power project. Electricity from the new project will be transported using an undersea power cable placed under the Strait of Belle Isle from Labrador to Newfoundland. A second undersea cable will transport power into Nova Scotia, New Brunswick, and the United States. The cable may also support the development of several other hydroelectric projects in New Brunswick and Nova Scotia. Studies have shown that the construction of 2 trans-isthmus power canals will reduce the extreme tidal height and raise the mass of water flowing into the Bay of Fundy. Kinetic turbines placed beneath the ocean surface across the entrances to the Bay of Fundy, Chignecto Bay, and the Minas Basin will generate up to 500 MW of power. Power generation from off-peak periods can be stored using pumped hydraulic storage installations. It was concluded that the projects may become viable within 10 to 30 years. 4 figs

  6. Communications and control for electric power systems: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kirkham, H.

    1998-04-01

    This report is a summary of some of the work done on the Communications and Control project, with particular emphasis on the achievements during the years 1986--1996. During those years, the project moved away from concern with dispersed storage and generation and its impact on power system operation (the team was responsible for studies in this area, and for making a power system simulator that included DSG), and became involved in more concrete work aimed at applying high-tech solutions to problems of power system communications and control. This report covers work done at JPL on the following topics: (1) the measurement of electric and magnetic fields, both ac and dc; (2) the use of optical power to supply low-power electronics; (3) the design of a fault-tolerant communication system designed for distribution automation; and (4) a digital phase locked loop that allows the use of low-power transmitting electronics to recreate a good-quality signal at the receiver. In a report of this kind, only the results and highlights of the work are described.

  7. Small-scale CDM projects in a competitive electricity industry: How good is a simplified baseline methodology?

    International Nuclear Information System (INIS)

    Shrestha, Ram M.; Abeygunawardana, A.M.A.K.

    2007-01-01

    Setting baseline emissions is one of the principal tasks involved in awarding credits for greenhouse gas emission (GHG) mitigation projects under the Clean Development Mechanism (CDM). An emission baseline has to be project-specific in order to be accurate. However, project-specific baseline calculations are subject to high transaction costs, which disadvantage small-scale projects. For this reason, the CDM-Executive Board (CDM-EB) has approved simplified baseline methodologies for selected small-scale CDM project categories. While the simplified methods help reduce the transaction cost, they may also result in inaccuracies in the estimation of emission reductions from CDM projects. The purpose of this paper is to present a rigorous economic scheduling method for calculating the GHG emission reduction in a hypothetical competitive electricity industry due to the operation of a renewable energy-based power plant under CDM and compare the GHG emission reduction derived from the rigorous method with that obtained from the use of a simplified (i.e., standardized) method approved by the CDM-EB. A key finding of the paper is that depending upon the level of power demand, prices of electricity and input fuels, the simplified method can lead to either significant overestimation or substantial underestimation of emission reduction due to the operation of renewable energy-based power projects in a competitive electricity industry

  8. Electric Power Regulation in Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Landa, J V [Universidad Nacional Autonoma de Mexico, Mexico City (Mexico)

    1994-12-31

    The history of the electrical power sector in Mexico, the prominent role that government plays in the generation, transformation, distribution and supply of electrical power, and the implications of the North American Free Trade Agreement (NAFTA) for this sector were summarized. The slow pace of the Mexican electricity sector in achieving cost efficiency through pricing policy was criticized, and the issue of regulation versus deregulation of the electricity sector was examined in the context of NAFTA, emphasizing the contradiction between the idea of international trade and a highly regulated industry. Revisions of the original constitutional article to exclude electrical power generation from governmental control and to allow market mechanisms and competition to lower costs and increase efficiency was recommended.It was considered a pre-condition to a stable balance between competition and energy efficient environmentally friendly practices.

  9. Implementing China's national energy conservation policies at state-owned electric power generation plants

    International Nuclear Information System (INIS)

    Zhao Xiaofan; Ortolano, Leonard

    2010-01-01

    China's 11th Five-Year Guideline identified energy conservation as one of the country's fundamental policies and established a mandatory target: 20% reduction in national average energy intensity by 2010. Despite the various policies, laws, and administrative reforms to support energy conservation, China fell behind schedule for meeting its conservation targets in 2006 and 2007. Using a combination of available literature and an interview-based case study, this paper examines the implementation of energy conservation and investigates impediments to achieving China's conservation goal in the electric power generation sector. Three key impediments are detailed: (1) municipal governments' incentives to overlook conservation-related central directives primarily because of budget pressures linked to financial decentralization, (2) procedural obstacles in the form of time required to obtain project approvals for high-efficiency power generation units, and (3) financial obstacles making it difficult for power generation enterprises to raise capital for energy conservation projects. An interview-based case study of a state-owned coal-fired electric power generation company demonstrates the influence of the aforementioned obstacles. While procedural obstacles are notable, they can be managed. However, electricity pricing reforms and/or stronger subsidy programs will be needed to address the financial obstacles facing Chinese power generation companies.

  10. Electric Power Transmission Lines

    Data.gov (United States)

    Department of Homeland Security — Transmission Lines are the system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power...

  11. Comparative assessment of nuclear power and other options: the DECADES project

    International Nuclear Information System (INIS)

    Vladu, I. F.

    1996-01-01

    This paper presents the results obtained in constructing and implementing a general framework for performing comprehensive assessment within the inter-agency joint project on Databases and Methodologies for Comparative Assessment of Different Energy Sources for electricity generation. The project was established in 1992 by nine international organizations. A short description of the DECADES project objectives, structure and main components is given. The technology inventory databases, which are a major part of the project, address all the levels of different energy chains, from fuel extraction through electricity generation to waste disposal. These databases support comparative assessment in the power sector, by providing generic information as well as country or region specific information on existing technologies and on those expected to enter the market in the next two to three decades. The paper further touches on the types of assessment that can be carried out using the methodology and databases developed. It point out in this regard the possibilities and limitations of comparative assessments performed at the level of power plant, full electricity supply chain and country or region electricity generation system. Illustrative results are presented for comparisons performed at all these levels. Case studies and workshops and seminars are one of the main activities carried out until now for validation and dissemination of the DECADES Computer Tools. In those studies where it was considered, nuclear power appeared to be cost effective for reducing emissions of CO 2 , SO 2 , NO x and other greenhouse gases. Finally, the paper briefly introduce the activities envisaged for the phase II of the DECADES project which will focus on disseminating the current computer tools, providing training in the use of the tools, and supporting country studies, and on development of new analytical capabilities. The paper concludes with some findings and remarks pointing out the

  12. Energy, Electricity and Nuclear Power Estimates for the Period up to 2050. 2014 Ed

    International Nuclear Information System (INIS)

    2014-01-01

    Reference Data Series No. 1 (RDS-1) is an annual publication — currently in its thirty-fourth edition — containing estimates of energy, electricity and nuclear power trends up to the year 2050. RDS-1 starts with a summary of the situation of nuclear power in IAEA Member States as of the end of 2013. The data on nuclear power presented in Tables 1 and 2 are based on actual statistical data collected by the IAEA’s Power Reactor Information System (PRIS). However, energy and electricity data for 2013 are estimated, as the latest information available from the United Nations Department of Economic and Social Affairs is for 2011. Population data originate from the World Population Prospects (2010 revision), published by the Population Division of the United Nations Department of Economic and Social Affairs. The 2013 values again are estimates. As in previous editions, projections of future energy and electricity demand and the role of nuclear power are presented as low and high estimates encompassing the inherent uncertainties involved in projecting trends. The RDS-1 estimates should be viewed as very general growth trends whose validity must be constantly subjected to critical review. Many international, national and private organizations routinely engage in energy demand and supply projections, including nuclear power. These projections are based on a multitude of different assumptions and aggregating procedures, making a straightforward comparison and synthesis very difficult. The basic differences relate to such fundamental input assumptions as: • Economic growth; • Correlation of economic growth and energy use; • Technology performance and costs; • Energy resource availability and future fuel prices; • Energy policy and physical, environmental and economic constraints

  13. Development on power distribution technologies of four electric power companies in Japan. The Kansai Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Since dependency upon electric power has been rising yearly with the development of industry and the progress of information-oriented society, various kinds of technical development are needed to supply electricity. Furthermore, amenity of people's living has been highly intended, and life style has varied. Consequently, customers' needs for energy including related services have varied remarkably, and each customer has selected energy more subjectively from the wide range of viewpoint such as reliability, handiness, cleanliness, safety, and economic efficiency. In such situation, the power distribution section of Kansai Electric Power settled four themes for major technical development and has been promoting them. Four themes are as follows; to develop a total automation system for power distribution, to promote 20kV/400V-class power distribution, to develop techniques to form facilities harmonizing with local amenity, and to make business management efficient with the advanced NC system. 3 figs., 4 tabs.

  14. Electric power systems

    CERN Document Server

    Weedy, B M; Jenkins, N; Ekanayake, J B; Strbac, G

    2012-01-01

    The definitive textbook for Power Systems students, providing a grounding in essential power system theory while also focusing on practical power engineering applications. Electric Power Systems has been an essential book in power systems engineering for over thirty years. Bringing the content firmly up-to-date whilst still retaining the flavour of Weedy's extremely popular original, this Fifth Edition has been revised by experts Nick Jenkins, Janaka Ekanayake and Goran Strbac. This wide-ranging text still covers all of the fundamental power systems subjects but is now e

  15. General conditions for electric power supply

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    If it is uncertain whether future power bills will be paid fully, it is admissible to take an action claiming a declaration which states that the electricity rate payment boycotter has no right to non-payment nor a right to withhold payment towards the electricity supply utility, and that the electricity supply utility has the right to stop energy supply because of reduced electricity rate payments effected and/or announced, and to denounce the contract without observing any term of notice. If the electricity buyer reduces a power bill to be paid without any legal grounds, the electricity supply utility has the right to stop power supplies and to denounce the power supply contract without observing any term of notice. The freedom of thought and the freedom of opinion must not be expressed by reducing power bills to be paid. Basic rights discontinue to be effective as soon as a contract or law is broken. A weighing of protected interests is not effected if the exercise of a basic law is unlawful. (orig./HP) [de

  16. ANALYSIS OF GROSS REGIONAL PRODUCT FLUCTUATIONS AND ELECTRIC POWER CONSUMPTION IN 2005- 2014. RESERVES FOR DECREASING ELECTRIC POWER PRICES

    Directory of Open Access Journals (Sweden)

    Suslov N. I.

    2016-09-01

    Full Text Available In this work we considered the trajectories of change in indicators characterizing the status of economics and power industry: gross regional product, electric power consumption, industrial production, energy prices and costs of delivering electric power to consumers in Russian regions for the last 10 years. Low global commodity prices and sanctions led to a sharp decrease of equipment import, which resulted in an acute problem of import substitution. The level of tariffs of natural monopolies is of great importance for industrial development. The goal of this work was to analyze possibilities for reducing electric power prices by changing the institutional and economic conditions of management. We analyzed not only the official information from Rosstat, but also government regulations, figures given in the official government publication «The Rossiyskaya Gazeta» as well as articles and interviews on economic problems of the electric power industry over the recent years published in «The Kommersant» newspaper. High tariffs of network marketing companies for electric energy transmission, state regulation of heating prices, financing the construction of new capacities by charging the payment in power provision contracts, high price of electric power of nuclear power plants lead to an annual increase in electric power prices for end users. In this work we considered possible solutions to limit the growth of electric power prices.

  17. Electricity, nuclear power and fuel cycle in OECD countries, main data 1987

    International Nuclear Information System (INIS)

    1987-01-01

    A questionnaire on Electricity Generation. Nuclear Power and Fuel Cycle Data is distributed annually to OECD Member Countries. In the questionnaire of January 1987, countries were asked to provide historical data for 1985 and 1986 and most likely projections up to the year 2005. The replies to the questionnaire or the results of the discussions between national correspondents and the Secretariat are presented in this Booklet. The Secretariat has, in some cases, referred to IEA's electricity-related data and IAEA's nuclear plant data. Where data were still unavailable the Secretariat made estimates based on information from other sources. Data for 1986 are provisional for several countries. The data on electricity generation and electric capacity are presented to the year 2005, and the data on fuel cycle services to the year 2000. The installed nuclear capacity of the OECD countries for the year 2000 is estimated at 340 GWe, a 25 GWe reduction from the estimate in the 1986 Booklet. This reduction is mainly due to revised lower projections of electricity demand. The Addendum contains an analysis of the present and past projections for installed nuclear capacity to 2000. It shows the total capacity of those plants connected to the grid, under construction and firmly planned to be in operation in 2000 as 294 GWe. The new projection of 340 GWe is well above this estimate, indicating that some countries are still planning to expand their nuclear capacities. In only one country does it appear that planned expansion has been affected specifically by the Chernobyl accident. The electricity generation and production data for fuel cycle services refer to those facilities located within the country, and thus exclude imports. The fuel cycle requirements, however, refer to the amounts of fuel cycle materials and services necessary for national nuclear power programmes

  18. Report on the bill project on a new electricity market organisation in France (n. 2451)

    International Nuclear Information System (INIS)

    2010-01-01

    This document reports the works of the Economic Affairs Commission of the French National Assembly on a bill project dealing with a new organisation of the electricity market. It reports the hearings of the Energy regulation commission Chairman and of the EDF Chairman, the general discussion of the Commission, and the discussion on the different bill articles. These articles are dealing with the access of electricity providers to the electricity produced by EDF, capacities required for electricity providers, power reservation contracts, and other regulatory aspects. A table compares the present situation, the content of the bill project, and the Commission's propositions

  19. 'Powering up' a green Saskatchewan: exploring possible sustainable solutions for Saskatchewan's electricity market

    International Nuclear Information System (INIS)

    Blanco, R.; Faubert, I.; Steele, K.; Wohrizek, J.; Donev, J.

    2013-01-01

    The electrical market in Saskatchewan is embarking on an exciting journey to both increase its generating capacity and reduce greenhouse gas (GHG) emissions to promote a more sustainable future. SaskPower is the centralized generation and transmission crown corporation for the province and has the ability to implement the necessary actions to create a sustainable electrical system. There are many paths that Saskatchewan can take for a more sustainable future. Currently, the future of Saskatchewan's electrical market depends on results from the Boundary Dam Carbon Capture and Storage (CCS) Demonstration Plant. This project proposes electrical capacity models for SaskPower in the event their current CCS project is not a feasible option. (author)

  20. Electric power and environment in Mexico

    International Nuclear Information System (INIS)

    Quintanilla, J.

    1997-01-01

    This volume is one of the three resulting volumes about the project named Document analysis and prospective organized by the National Autonomous University of Mexico (UNAM) through it University Energy Program (PUE). It is a non-periodical publication collection of the variable content and extent that as a whole constitutes an information heritage and an original contribution about the energy problematic as International level as at the country context and the University activities. In this book the manners of producing electrical energy are discussed, so how satisfying the growing necessities of this energy in Mexico without contaminating environment and how doing rational and efficient use of energy. The content of each document of this book is however exclusive responsibility of authors, as in the information as in their told opinions. The following papers were presented: 1) Hydroelectricity, soils use and water management. 2) The electric generation in Mexico and its environmental impacts: Past, present and future. 3) The nucleo electricity and the radioactive materials management. 4) Exposure to electromagnetic fields and its association with leukemia in children. 5) The electric power in Mexico and the supportable development. 6) Potential of electric generation at great scale with eolic energy in Mexico. 7) Toward an electric generation scheme distributed with non-conventional energies. 8) Renewable sources of energy in Mexico at the Century 21. (Author)

  1. Modernization of electric power systems of the Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gabaldon, M. A.; Gonzalez, J. J.; Prieto, I.

    2011-01-01

    The Power Increase Project of Laguna Verde Nuclear Plant has entailed the replacement, in one unique outage, of the main power electrical systems of the Plant (Isolated Phase Bars, Generator Circuit Breaker and Main Transformer) as well as the replacement of the Turbo-group. The simultaneous substitution of these entire system has never been done by any other Plant in the world, representing an engineering challenge that embraced the design of the new equipment up to the planning, coordination and management of the construction and commissioning works, which were successfully carried out by Iberdrola within the established outage period /47 days) for both units. (Author)

  2. The electric-powered vehicle reaches the town center; Le vehicule electrique gagne le coeur de la ville

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The second edition of this book on electric-powered vehicles has been actualized and completed with the presentation of clean public transportation systems and hybrid electric-powered vehicles. It shows the practical aspects of some recent and innovative projects. All pictures, tables and data have been updated. (J.S.)

  3. The electrical system of nuclear power plant

    International Nuclear Information System (INIS)

    Firman Silitonga; Gunarwan Prayitno

    2009-01-01

    In these system, electrical power system is supplied from two-offsite transmission system respective main transformer and house service transformer; and reserve transformer. The electrical load in these system consist of safety electrical system and non-safety electrical system, The safety electrical and non safety electrical systems consist of four 6,9 kV AC medium voltage bus and 480 V AC low voltage bus system. The DC power system consist of four safety 125 V DC power system and the two non-safety 125 DC power systems. The equipment in these electrical system is main turbine-generator; GTG safety; GTG alternate; uninterrupted power supply (UPS) and battery system. To protect electrical equipment and building to direct stroke and non direct stroke disturbances is installed netral grounding system and lightning protection and protection the personnel to touch-voltage is installed equipment grounding system and station grounding. The lightning arrester system is connected to station station grounding system. (author)

  4. Overview of renewable electric power in 2016 in Normandy

    International Nuclear Information System (INIS)

    Berg, Patrick

    2017-06-01

    This publication proposes an assessment of renewable electricity produced in 2016 in the Normandie region, and thus highlights how these territories are committed in an energy transition logics and in a positive evolution of the region energy mix. After a recall of national and regional objectives in terms of final consumption and of shares of renewable energies, definitions, figures, objectives, installed and connected powers, projects, evolutions, electric power production cover rate, numbers and locations of installations are given by graphs and maps and briefly commented for the different renewable sources: onshore wind energy, solar photovoltaic energy, hydroelectricity, bio-energies. A regional assessment which gathers some of these information is given, and modalities of support to renewable energies are briefly presented for onshore and offshore wind energy, photovoltaic, hydroelectricity and biogas

  5. Electric power distribution. Elektrische Energieverteilung

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, H; Frohne, H; Vaske, P

    1982-01-01

    The first chapter on electric power supply networks discusses transmitting media, their characteristic values, and the dimensioning of electric lines and networks; cables are given particular attention. High-voltage d.c. transmission and reactive power compensation are discussed. The next chapter describes the calculation of short-circuits and earth leakages for various neutral circuits on the basis of symmetric components. The newly introduced mesh current method for complex calculation of electric networks makes use of the potential of pocket computers. Chapter 3 discusses protective devices, i.e. earth systems and electronic protection. The next two chapters describe switch gear and power plants, including recent technical changes. The final chapter, which discusses the electric power industry, has been rewritten and extended. Methods of calculation, e.g. annual cost and cash value, are applied to transmitting media and plants. There is an extensive appendix with characteristic values of cables and overhead lines, graphical symbols, distinguishing signs of wiring diagrams, a bibliography of books, DIN standards, VDE specifications, and formulas.

  6. Fast Charging Electric Vehicle Research & Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Heny, Michael

    2014-03-31

    The research and development project supported the engineering, design and implementation of on-road Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: Short Commute: Defined as EVs performing in limited duration, routine commutes. - Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. - Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehicle-related greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment

  7. Energy, Electricity and Nuclear Power Estimates for the Period up to 2050. 2011 Edition

    International Nuclear Information System (INIS)

    2011-01-01

    Reference Data Series No. 1 (RDS-1) is an annual publication - currently in its thirty first edition - containing estimates of energy, electricity and nuclear power trends up to the year 2050. RDS-1 starts with a summary of the situation of nuclear power in IAEA Member States as of the end of 2010. The data on nuclear power presented in Tables 1 and 2 are based on actual statistical data collected by the IAEA's power Reactor Information System (pRIS). However, energy and electricity data for 2010 are estimated, as the latest information available from the united Nations Department of Economic and Social Affairs is for 2008 only. population data originate from the world population prospects (2010 revision), published by the population Division of the united Nations Department of Economic and Social Affairs. The 2010 values again are estimates. As in previous editions, projections of future energy and electricity demand and the role of nuclear power are presented as low and high estimates encompassing the inherent uncertainties involved in projecting trends. The RDS-1 estimates should be viewed as very general growth trends whose validity must be constantly subjected to critical review. Beginning with the 30th edition of this publication, however, the end-point of the estimates was extended up to the year 2050 (instead of 2030). Looking beyond 2030 has been prompted by the interest expressed by numerous Member States currently without nuclear power in adding nuclear energy to their future national energy supply mixes. Given the extensive lead times in planning and implementing nuclear power programmes, a fair share of these are likely to result in actual plant commissioning and grid connection after 2030. Many international, national and private organizations routinely engage in energy demand and supply projections, including nuclear power. These projections are based on a multitude of different assumptions and aggregating procedures, which make a straightforward

  8. Electric Power Research Institute's role in applying superconductivity to future utility systems

    International Nuclear Information System (INIS)

    Rabinowitz, M.

    1975-01-01

    Economics has been the single most important factor in determining the future of any new commercial technology in the United States. This criterion is in need of serious examination in view of the projected sharply increasing consumption of energy in the next few decades, particularly in the form of electricity. In order to make a smooth and meaningful transition from conventional methods of generating and transmitting electricity, a coordinated effort between all segments of the private and public domains will be required. The Electric Power Research Institute (EPRI) should play a vital role in planning for both the imminent short term, and long term national electrical energy needs; and in coordinating efforts to achieve these vital goals. If, as predicted, the U. S. power consumption increases by more than a factor of six in the next 30 years, it should be clear that it is necessary to develop high power density methods of producing and transmitting electricity. Superconductivity is the natural prime candidate for a new feasible technology that can take on this responsibility

  9. Meeting our need for electric energy: the role of nuclear power

    International Nuclear Information System (INIS)

    1984-07-01

    This report focuses on the projected long-term growth of electric demand and the resultant need for new electric generating capacity through the year 2010. It summarizes the results of several technical and economic analyses done over the past two years to present two alternative scenarios for the future growth of nuclear energy in the United States. The first of these scenarios is based on a reference assumption of continued economic recovery and growth, while the second assumes a more vigorous economic recovery. These alternative scenarios reflect both the role that electricity could play in assuring the future economic wellbeing of the United States and the role that nuclear power could play in meeting future electricity needs. The scenarios do not project an expected future; rather, they describe a future that can be achieved only if US industry is revitalized in several key areas and if current obstacles to construction and operation of nuclear power plants are removed. This report underscores the need for renewed domestic industrialization as well as the need for government and industry to take steps to allow nuclear energy to fulfill its original potential. Further, it suggests some specific actions that must be taken if these goals are to be met

  10. Power Electronics and Electric Machines Publications | Transportation

    Science.gov (United States)

    Research | NREL and Electric Machines Publications Power Electronics and Electric Machines Publications NREL and its partners have produced many papers and presentations related to power electronics and from power electronics and electric machines research are available to the public. Photo by Pat Corkery

  11. Electrical power systems for Mars

    Science.gov (United States)

    Giudici, Robert J.

    1986-01-01

    Electrical power system options for Mars Manned Modules and Mars Surface Bases were evaluated for both near-term and advanced performance potential. The power system options investigated for the Mission Modules include photovoltaics, solar thermal, nuclear reactor, and isotope power systems. Options discussed for Mars Bases include the above options with the addition of a brief discussion of open loop energy conversion of Mars resources, including utilization of wind, subsurface thermal gradients, and super oxides. Electrical power requirements for Mission Modules were estimated for three basic approaches: as a function of crew size; as a function of electric propulsion; and as a function of transmission of power from an orbiter to the surface of Mars via laser or radio frequency. Mars Base power requirements were assumed to be determined by production facilities that make resources available for follow-on missions leading to the establishment of a permanently manned Base. Requirements include the production of buffer gas and propellant production plants.

  12. Electric G-Van demonstration and commercial assessment project

    Energy Technology Data Exchange (ETDEWEB)

    Braga, B.D. (Electric Power Research Inst., Palo Alto, CA (United States))

    1992-12-01

    The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

  13. Electric power transmission system: A new expansion scheme

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    With the purpose of responding to the interconnection requirements among the main cities of the country, a company of public character was created, in charge of the planning and of the development of the national interconnected system (NIS), in such form that their work optimized the use of the available energy resources for the electricity supply and it improved the accounting levels and quality of the service. Starting from 1967, interconnection electric Corp., ISA, a very important task began in the development of methodologies and strategies of expansion of the INS that it allowed, in very short term, to connect the areas of Bogota the Atlantic Cost, Antioquia and the Cauca Valley and to develop important generation projects for the supply of electric power of the country. Then, the electric sector was reformed through the laws 142 and 143 of 1994, in search of the specialization of the business and in that sense, ISA is divided in two companies: ISAGEN that the activities degeneration and electric power commercialization, and ISA, company electric power transport, that it takes charge of the interconnection of the national system assumes. In connection with the execution of the transmission works and in the face of the possibility of lingering courts of energy, the law establishes that ISA will carry out the works that are needed and that the particular initiative doesn't develop. For that same time, it is considered that the planning should be carried out in an integral way, taking into account the requirements of the population's energy and its possibilities of supply and through programs and actions of appropriate use of the available energy resources. The UPME (Unit of Planning Miner Energetic) was created for assumes this work, so with their analyses they already offer signs to the state the investors, about the population's necessities and of the business opportunities, respectively

  14. Methods for Estimation of Market Power in Electric Power Industry

    Science.gov (United States)

    Turcik, M.; Oleinikova, I.; Junghans, G.; Kolcun, M.

    2012-01-01

    The article is related to a topical issue of the newly-arisen market power phenomenon in the electric power industry. The authors point out to the importance of effective instruments and methods for credible estimation of the market power on liberalized electricity market as well as the forms and consequences of market power abuse. The fundamental principles and methods of the market power estimation are given along with the most common relevant indicators. Furthermore, in the work a proposal for determination of the relevant market place taking into account the specific features of power system and a theoretical example of estimating the residual supply index (RSI) in the electricity market are given.

  15. Investments and price formation in a liberalized electric power market; Investering og prisdannelse pae et liberaliseret elmarked

    Energy Technology Data Exchange (ETDEWEB)

    Morthorst, P.E.

    2005-05-01

    How will the electric power prices in the Nordic electric power market develop if the generation capacity in the coming 10 to 15 years is increased considerably? And what are the conditions for investors to initiate new investments in power plants? Briefly speaking - these are the issues for the project that is reported in this report. The basis for the project has been the Nordic electric power market model and its capability to handle the future extension of the necessary generating capacity. The main issue in the project has been a quantitative analysis of what the prices in the Nordic electric power market will be in the future, depending on the size of new investments in the power generating capacity. Using the Balmorel model, a basic scenario until the year 2020 is made which contains the present decisions about capacity extension only. Up to 2010 this basic scenario can be seen as a probable development. For the period 2010 to 2020, however, the calculations can primarily be seen as illustrations of how the prices may develop, provided that no further investments are made. Thus, for the period 2010 - 2020 it is a 'worst case' that has been analysed. In the basic scenario several cases for the year 2015 are analysed, among others the consequences of wet and dry years and an unusually cold winter. The project also analyses how the price development impacts the profitability of new investments in power capacity, depending on several exogenous events, like use of more wind power and the price on the carbon dioxide market. The analyses present three cases: 1) A single investor not owing other power plants, 2) a single investor owing a number of power plants in which case a new plant will compete with him self, 3) two competing investors investing in the same known power plants. In all cases investments are made in a natural gas combined cycle plant producing both electric power and heat. Furthermore, the investor's own possibility to time his

  16. Electric power system basics for the nonelectrical professional

    CERN Document Server

    Blume, Steven W

    2016-01-01

    The second edition of Steven W. Blume’s bestseller provides a comprehensive treatment of power technology for the non-electrical engineer working in the electric power industry. This book aims to give non-electrical professionals a fundamental understanding of large interconnected electrical power systems, better known as the “Power Grid”, with regard to terminology, electrical concepts, design considerations, construction practices, industry standards, control room operations for both normal and emergency conditions, maintenance, consumption, telecommunications and safety. The text begins with an overview of the terminology and basic electrical concepts commonly used in the industry then it examines the generation, transmission and distribution of power. Other topics discussed include energy management, conservation of electrical energy, consumption characteristics and regulatory aspects to help readers understand modern electric power systems.

  17. Development on power distribution technologies of four electric power companies in Japan. The Tokyo Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Electric power companies have been needed to cope with various needs in accordance with the progress of highly information-oriented society, the improvement of industrial technology, and the advancement and diversification of the living environment. In such situation, the power distribution section of Tokyo Electric Power has promoted technical development, setting up following priority items to put into operation: to reduce power failure caused by works and accidents, to improve reliability in supply, to reduce costs of construction and all over business management, to serve customers to answer various needs, to develop new technology and new methods based on the medium- and long-term prospect, and so forth. Several examples of recent technical development are introduced here. They are as follows; compact equipment and materials for electric poles to match the circumstances of cities and to simplify the construction method for power distribution, a 750kVA large high-voltage power-generation truck to make provision against an emergency such as a disaster by a typhoon, a compact transformer used on the ground, a high-voltage automatic cabinet, and a detector to find the failure of indoor power distribution works in resistances in a short time. 8 figs.

  18. Electric power trading. The first study on stakes and consequences of power trading

    International Nuclear Information System (INIS)

    2000-06-01

    Power trading (purchase/sale of electricity on a stock exchange) is an emerging activity in continental Europe while it already came to maturity in the US, in the UK and in Scandinavia. Several stock exchanges have opened since 1988, in particular in Germany, Spain and in The Netherlands. New projects of creation are under study, except in France where public authorities remain reticent with respect to this evolution. Power trade is deeply overturning the organization of power markets with offering an alternative to the direct supply from producers and distributors. This study presents the functioning modes of the main stock exchanges in operation today. It analyzes the stakes of power trade for all intervening parties of the market (historical actors, newcomers and consumers). The situation and the strategic behaviour of 12 key-actors of the power sector are also examined. (J.S.)

  19. French electric power balance sheet 2010

    International Nuclear Information System (INIS)

    Lartigau, Thierry; Riere, Alexia

    2011-01-01

    The mission of RTE, the French electricity Transportation grid, a public service assignment, is to balance the electricity supply and demand in real time. This report presents RTE's technical results for the year 2010: increase of RTE's investments and safety expenses for adapting the grid to the new electricity industry stakes and to meteorological hazards, decrease of power cuts frequency, rise of the French power consumption, strong increase of winter consumption peaks, increase of the French power generation, increase of the positive trade balance. New RTE's infrastructures, electricity quality data, and the evolution of market mechanisms are presented in appendixes

  20. CALCULATION METHOD OF ELECTRIC POWER LINES MAGNETIC FIELD STRENGTH BASED ON CYLINDRICAL SPATIAL HARMONICS

    Directory of Open Access Journals (Sweden)

    A.V. Erisov

    2016-05-01

    Full Text Available Purpose. Simplification of accounting ratio to determine the magnetic field strength of electric power lines, and assessment of their environmental safety. Methodology. Description of the transmission lines of the magnetic field by using techniques of spatial harmonic analysis in the cylindrical coordinate system is carried out. Results. For engineering calculations of electric power lines magnetic field with sufficient accuracy describes their first spatial harmonic magnetic field. Originality. Substantial simplification of the definition of the impact of the construction of transmission line poles on the value of its magnetic field and the bands of land alienation sizes. Practical value. The environmentally friendly projection electric power lines on the level of the magnetic field.

  1. Electric power system applications of optimization

    CERN Document Server

    Momoh, James A

    2008-01-01

    Introduction Structure of a Generic Electric Power System  Power System Models  Power System Control Power System Security Assessment  Power System Optimization as a Function of Time  Review of Optimization Techniques Applicable to Power Systems Electric Power System Models  Complex Power Concepts Three-Phase Systems Per Unit Representation  Synchronous Machine Modeling Reactive Capability Limits Prime Movers and Governing Systems  Automatic Gain Control Transmission Subsystems  Y-Bus Incorporating the Transformer Effect  Load Models  Available Transfer Capability  Illustrative Examples  Power

  2. The electric power sector in Iceland

    International Nuclear Information System (INIS)

    Ingimarsson, J.

    1992-01-01

    In Iceland the government must give permission for the building of a power station etc. but in practise the power plant administrators determine the tariffs. The structure of electric power supply mirrors a strong engagement on the part of the state and the local authorities. Almost all the power plants and distribution systems are state owned or owned by both the state and the local authorities, and so constitute a monopoly, producing 93% of the total amount of electricity supply. Government policy in this field, the Icelandic electric power distribution system and the setting of electricity prices are briefly described. It is claimed that there would be economical advantages in restructuring the distribution network and that the government favours an increase in possibilities for competition and making legislative changes. This will mean that in the future the market will play a more important role and that power plant administrators must review their duties regarding consumer satisfaction, tariffs etc. (AB)

  3. Project organization for automating an industrial power plant

    International Nuclear Information System (INIS)

    Williams, D.R.; McCowen, R.R.

    1988-01-01

    This paper reports on the controls for three boilers and three turbine generators at the power plant at the John Deere Waterloo Works that have been retrofit with a microprocessor based monitoring, control, and optimization system. The factors driving the project in the 15 mW, 500,000 lb/hr, 35 year old plant were reduced electricity costs due to peak shaving, energy conservation, labor savings, reduced maintenance costs and improved reliability. A turnkey design/build arrangement was sought after a preliminary study indicated an attractive return on investment Control system vendors and design/build contractors were evaluated using a group decision making method. A design/build contractor was chosen to do an in-depth study and write specifications for the control system were negotiated with the contractor The project was managed by the Power Plant and Energy Management Department, rather than by the staff department normally responsible for capital projects

  4. Industry sector analysis, Mexico: Electric power production and distribution equipment. Export Trade Information

    International Nuclear Information System (INIS)

    Wood, J.S.; Miller, R.W.

    1988-09-01

    The Industry Sector Analyses (I.S.A.) for electric power production and distribution equipment contains statistical and narrative information on projected market demand, end-users, receptivity of Mexican consumers to U.S. products, the competitive situation - Mexican production, total import market, U.S. market position, foreign competition, and competitive factors, and market access - Mexican tariffs, non-tariff barriers, standards, taxes and distribution channels. The I.S.A. provides the United States industry with meaningful information regarding the Mexican market for electric power production and distribution equipment

  5. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Sandra R.; Johnson, Melvin; McClevey, Kenneth; Calopedis, Stephen; Bolden, Deborah

    1992-05-01

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed for the North American Electric Reliability Council (NERC) regions. Additionally, statistics by company and plant are published in the EPM on capability of new plants, new generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel.

  6. Potentiality Prediction of Electric Power Replacement Based on Power Market Development Strategy

    Science.gov (United States)

    Miao, Bo; Yang, Shuo; Liu, Qiang; Lin, Jingyi; Zhao, Le; Liu, Chang; Li, Bin

    2017-05-01

    The application of electric power replacement plays an important role in promoting the development of energy conservation and emission reduction in our country. To exploit the potentiality of regional electric power replacement, the regional GDP (gross domestic product) and energy consumption are taken as potentiality evaluation indicators. The principal component factors are extracted with PCA (principal component analysis), and the integral potentiality analysis is made to the potentiality of electric power replacement in the national various regions; a region is taken as a research object, and the potentiality of electric power replacement is defined and quantified. The analytical model for the potentiality of multi-scenario electric power replacement is developed, and prediction is made to the energy consumption with the grey prediction model. The relevant theoretical research is utilized to realize prediction analysis on the potentiality amount of multi-scenario electric power replacement.

  7. Solar energy thermally powered electrical generating system

    Science.gov (United States)

    Owens, William R. (Inventor)

    1989-01-01

    A thermally powered electrical generating system for use in a space vehicle is disclosed. The rate of storage in a thermal energy storage medium is controlled by varying the rate of generation and dissipation of electrical energy in a thermally powered electrical generating system which is powered from heat stored in the thermal energy storage medium without exceeding a maximum quantity of heat. A control system (10) varies the rate at which electrical energy is generated by the electrical generating system and the rate at which electrical energy is consumed by a variable parasitic electrical load to cause storage of an amount of thermal energy in the thermal energy storage system at the end of a period of insolation which is sufficient to satisfy the scheduled demand for electrical power to be generated during the next period of eclipse. The control system is based upon Kalman filter theory.

  8. Electric power balance sheet 2012

    International Nuclear Information System (INIS)

    2013-01-01

    The mission of RTE, the French electricity Transportation grid, a public service assignment, is to balance the electricity supply and demand in real time. This report presents RTE's technical results for the year 2012: strong seasonal contrast of power consumption, rise of the renewable energies contribution in meeting the electricity demand, slight decay of the nuclear and thermal power generation, decrease of the export balance and change in trades structure, adaptation of RTE's network to the evolutions of the energy system

  9. Energy, electricity and nuclear power estimates for the period up to 2030. 2007 ed

    International Nuclear Information System (INIS)

    2007-01-01

    Reference Data Series No. 1 is an annual publication - currently in its twenty-seventh edition - containing estimates of energy, electricity and nuclear power trends up to the year 2030. Nuclear data presented are based on actual statistical data collected by the IAEA's Power Reactor Information System (PRIS). Energy and electricity data for 2006, however, are estimated, since the latest available information from the Department of Economic and Social Affairs of the United Nations is for 2004. Population data originate from the World Population Prospects (2003 Revision), published by the Population Division of the UN Department of Economic and Social Affairs, and the 2005 values are estimates. The future growth of energy, electricity and nuclear power up to the year 2030 is presented as low and high estimates in order to encompass the uncertainties associated with the future. These estimates should be viewed as very general growth trends whose validity must constantly be subjected to critical review. The energy forecasts carried out in increasing numbers over the last years by international, national and private organizations are based on a multiplicity of different assumptions and different aggregating procedures, which make their comparison and synthesis very difficult. The basic differences refer to such fundamental input data as: - World and regional scenarios of economic development; - Correlation of economic growth and energy consumption; - Assumptions on physical, economic and political constraints applying to energy production and consumption; - Future prices of different energy sources. The projections presented in this booklet are based on a compromise among: - National projections supplied by each country for a recent OECD/NEA study; - Indicators of development published by the World Bank in its World Development Indicators; - Estimates of energy, electricity and nuclear power growth continuously carried out by the IAEA in the wake of recent global and

  10. Requirement analysis for autonomous systems and intelligent agents in future Danish electric power systems

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten

    2010-01-01

    we review innovative control architectures in electric power systems such as Microgrids, Virtual power plants and Cell based systems. We evaluate application of autonomous systems and intelligent agents in each of these control architectures particularly in the context of Denmark's strategic energy...... plans. The second part formulates a flexible control architecture for electric power systems with very high penetration of distributed generation. This control architecture is based upon the requirements identified in the first part. We also present development of a software framework to test......Denmark has already achieved a record of 20% penetration of wind power and now moving towards even higher targets with an increasing part of the electricity produced by distributed generators (DGs). In this paper we report work from a sub activity "subgrid design" of the EcoGrid.dk project. First...

  11. Electric power engineering in the Taiwan Chinese Republic

    International Nuclear Information System (INIS)

    Kozlov, V.B.

    1992-01-01

    The data charaterizing the status and prospects of development of electric power engineering in the Taiwan Chenese Republic are given. The Tainwan electric power consumptions are covered by operation of 56 large electric power plants (nuclear, thermal, hydroelectric ones). The marginal majority (58.1%) of the registered power is generated at thermal power plants. Electric power generation in 1991 amounted to 89639 million kWxh. At that 33878 million kWxh or about 37.9% were produced at NPPs

  12. CHOOSING THE POWER OF TRACTION ELECTRIC MOTORS FOR ELECTRIC VEHICLES

    OpenAIRE

    O. Smirnov; A. Borisenko

    2017-01-01

    Recommendations on choosing the power of the electric motor, depending on the weight of the vehicle, its speed and the run distance in the «only electricity» mode are developed. Based on mathematical modeling and a number of field tests of electric vehicles, a three-dimensional dependance of the power on the weight and the speed set is built and conclusions are presented.

  13. CHOOSING THE POWER OF TRACTION ELECTRIC MOTORS FOR ELECTRIC VEHICLES

    Directory of Open Access Journals (Sweden)

    O. Smirnov

    2017-06-01

    Full Text Available Recommendations on choosing the power of the electric motor, depending on the weight of the vehicle, its speed and the run distance in the «only electricity» mode are developed. Based on mathematical modeling and a number of field tests of electric vehicles, a three-dimensional dependance of the power on the weight and the speed set is built and conclusions are presented.

  14. The SYOEKSY research project. Electrically-powered vehicles in ring rail line feeder traffic and short-distance travel; Saehkoeiset ajoneuvot kehaeradan syoettoe- ja asiointiliikenteessae. SYOEKSY-tutkimushankkeen loppuraportti 21.9.2011

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    The research report is divided into three sections: a general description of the project, separate reports on each of the themes investigated and a summary of the research results and recommendations. Section 2 deals with themes such as: Low-emissions-technology solutions for traffic and their technical prerequisites in an urban environment and the results obtained from pilot projects. New service models based on electrically-powered traffic technology with an assessment of their feasibility and their effect on urban infrastructure and levels of CO{sub 2} emissions. User needs in new feeder traffic, short-distance travel and other journeys on personal business together with proposals for planning measures which will promote sustainable mobility in new residential areas. The prerequisites for electrically-powered feeder traffic and short-distance travel are therefore handled in a wide-ranging manner. A condensed version of the project conclusions and recommendations is provided in Section 3. A list of the data sources and publications resulting from project work can be found at the end of the report

  15. Reference costs of the electric power production

    International Nuclear Information System (INIS)

    2003-06-01

    This study periodically realized by the DGEMP aims to compare the competitiveness of the different channels of electric power production, for different utilization conditions. The first part ''reference costs of the 2003 electric power production'' examines the prices of the electric power produced by different channels in particular in the framework of the industrial implementing in 2015. The nuclear and thermal power plants are concerned. The second part is devoted to the decentralized production channels (wind energy, photovoltaic, cogeneration heat-electricity) is under construction and will be presented next year. (A.L.B.)

  16. Progress of innovation of electrical power technology in 2013

    International Nuclear Information System (INIS)

    Nakaiwa, Masaru; Inumaru, Jun; Hamada, Takashi

    2014-01-01

    The following is the description of technical innovations at five companies including Central Research Institute of Electric Power Industry, Japan Atomic Energy Agency, and Japan Nuclear Fuel Ltd. Central Research Institute of Electric Power Industry presented their efforts in (1) advancement of the safety of light water reactors (2) clarification of radiological risks and improvement of radiation protection matters (3) support of backend projects and (4) countermeasures against natural disasters for electric power distribution facilities aiming at the establishment of the optimum risk management. Japan Atomic Energy Agency presented the research and development related to (1) measures taken for the Fukushima Daiichi nuclear power plant accident (2) practical use of FBR cycle (3) disposal technology of high-level radioactive wastes (4) technical system to extract fusion energy (5) particle beam technology (6) research based on the formation of the foundation and social needs of atomic study (7) nuclear hydrogen/heat application (8) atomic safety (9) backend measures; and (10) nuclear proliferation. Japan Nuclear Fuel Ltd. presented the record of 5 and half years from the start to the completion of vitrification test. In the course of the development, the active test started from March 2003 was suspended due to the Great East Japan Earthquake on March 11th, 2011 but resumed thereafter and completed. (S.Y.)

  17. Electric Power Monthly, June 1988

    International Nuclear Information System (INIS)

    1988-06-01

    The data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The Energy Information Administration (EIA) collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The Electric Power Monthly contains information from three data sources: the Form EIA-759, 'Monthly Power Plant Report'; the Federal Energy Regulatory Commission (FERC) Form 423, 'Monthly Report of Cost and Quality of Fuels for Electric Plants ; and the Form EIA-826, M onthly Electric Sales and Revenue Report with State Distributions'. The Form EIA-759 collects data from all operators of electric utility generating plants (except those having plants solely on standby), approximately 800 of the more than 3,200 electric utilities in the United States. To reduce the reporting burden for utilities, the FERC Form 423 and Form EIA-826 data are based on samples, which cover less than 100 percent of all central station generating utilities. The FERC Form 423 collects data from steam-electric power generating plants with a combined installed nameplate capacity of 50 megawatts or larger (approximately 230 electric utilities). The 50-megawatt threshold was established by FERC. The Form EIA-826 collects sales and revenue data in the residential, commercial, industrial, and other sectors of the economy. Other sales data collected include public street and highway lighting, other sales to public authorities, sales to railroads and railways, and interdepartmental sales. Respondents to the Form EIA-826 were statistically chosen and include approximately 225 privately and publicly owned electric utilities from a universe of more than 3,200 utilities. The sample selection for the Form EIA-826 is evaluated annually. Currently, the Form EIA-826 data account for approximately 83 percent

  18. Comprehensive evaluation of power grid projects' investment benefits under the reform of transmission and distribution price

    Science.gov (United States)

    Wang, Yongli; Wang, Gang; Zuo, Yi; Fan, Lisha; Ling, Yunpeng

    2017-03-01

    On March 15, 2015, the Central Office issued the "Opinions on Further Deepening the Reform of Electric Power System" (Zhong Fa No. 9). This policy marks the central government officially opened a new round of electricity reform. As a programmatic document under the new situation to comprehensively promote the reform of the power system, No. 9 document will be approved as a separate transmission and distribution of electricity prices, which is the first task of promoting the reform of the power system. Grid tariff reform is not only the transmission and distribution price of a separate approval, more of the grid company input-output relationship and many other aspects of deep-level adjustments. Under the background of the reform of the transmission and distribution price, the main factors affecting the input-output relationship, such as the main business, electricity pricing, and investment approval, financial accounting and so on, have changed significantly. The paper designed the comprehensive evaluation index system of power grid projects' investment benefits under the reform of transmission and distribution price to improve the investment efficiency of power grid projects after the power reform in China.

  19. Hybrid electric vehicle power management system

    Science.gov (United States)

    Bissontz, Jay E.

    2015-08-25

    Level voltage levels/states of charge are maintained among a plurality of high voltage DC electrical storage devices/traction battery packs that are arrayed in series to support operation of a hybrid electric vehicle drive train. Each high voltage DC electrical storage device supports a high voltage power bus, to which at least one controllable load is connected, and at least a first lower voltage level electrical distribution system. The rate of power transfer from the high voltage DC electrical storage devices to the at least first lower voltage electrical distribution system is controlled by DC-DC converters.

  20. Teaching Power Electronics with a Design-Oriented, Project-Based Learning Method at the Technical University of Denmark

    Science.gov (United States)

    Zhang, Zhe; Hansen, Claus Thorp; Andersen, Michael A. E.

    2016-01-01

    Power electronics is a fast-developing technology within the electrical engineering field. This paper presents the results and experiences gained from applying design-oriented project-based learning to switch-mode power supply design in a power electronics course at the Technical University of Denmark (DTU). Project-based learning (PBL) is known…

  1. Fundamentals of electric power engineering engineering from electromagnetics to power systems

    CERN Document Server

    Ceraolo, Massimo

    2014-01-01

    At the basis of many sectors of engineering, electrical engineering deals with electricity phenomena involved in the transfer of energy and power. Professionals requiring a refresher course in this interdisciplinary branch need look no further than Fundamentals of Electric Power Engineering, which imparts tools and trade tricks to remembering basic concepts and grasping new developments. Even established engineers must supplement their careers with an invigorated knowledge base, and this comprehensive resource helps non-electrical engineers amass power system information quickly.

  2. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    International Nuclear Information System (INIS)

    Grecheck, Eugene S.; Batalo, David P.

    2010-01-01

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  3. Estimate of China's energy carbon emissions peak and analysis on electric power carbon emissions

    Directory of Open Access Journals (Sweden)

    Zhi-Xuan Wang

    2014-12-01

    Full Text Available China's energy carbon emissions are projected to peak in 2030 with approximately 110% of its 2020 level under the following conditions: 1 China's gross primary energy consumption is 5 Gtce in 2020 and 6 Gtce in 2030; 2 coal's share of the energy consumption is 61% in 2020 and 55% in 2030; 3 non-fossil energy's share increases from 15% in 2020 to 20% in 2030; 4 through 2030, China's GDP grows at an average annual rate of 6%; 5 the annual energy consumption elasticity coefficient is 0.30 in average; and 6 the annual growth rate of energy consumption steadily reduces to within 1%. China's electricity generating capacity would be 1,990 GW, with 8,600 TW h of power generation output in 2020. Of that output 66% would be from coal, 5% from gas, and 29% from non-fossil energy. By 2030, electricity generating capacity would reach 3,170 GW with 11,900 TW h of power generation output. Of that output, 56% would be from coal, 6% from gas, and 37% from non-fossil energy. From 2020 to 2030, CO2 emissions from electric power would relatively fall by 0.2 Gt due to lower coal consumption, and relatively fall by nearly 0.3 Gt with the installation of more coal-fired cogeneration units. During 2020–2030, the portion of carbon emissions from electric power in China's energy consumption is projected to increase by 3.4 percentage points. Although the carbon emissions from electric power would keep increasing to 118% of the 2020 level in 2030, the electric power industry would continue to play a decisive role in achieving the goal of increase in non-fossil energy use. This study proposes countermeasures and recommendations to control carbon emissions peak, including energy system optimization, green-coal-fired electricity generation, and demand side management.

  4. An Optimum Solution for Electric Power Theft

    Directory of Open Access Journals (Sweden)

    Aamir Hussain Memon

    2013-07-01

    Full Text Available Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already

  5. An Optimum Solution for Electric-Power Theft

    International Nuclear Information System (INIS)

    Memon, A.H.; Memon, F.

    2013-01-01

    Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments) Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already. (author)

  6. Advance in technologies of electric power in 2008

    International Nuclear Information System (INIS)

    Hamada, Kenichi; Maekawa, Fumiaki; Nakamura, Akio

    2008-01-01

    Ten electric power companies and two related companies reported their advance in technologies. The technologies of nuclear power plants were stated by ten companies, which consisted of introduction of new main control board to Tomari-3 in Hokkaido Electric Power Co., Inc., reduction methods of exposure dose of Higashidori-1 in Tohoku Electric Power, hot water based two-phase flow testing device for pipe thinning test by Tokyo Electric Power Company, Guideline for prevention of piping damage caused by combustion of mixture gases in BWR (the second edition) published by Thermal and Nuclear Power Engineering Society, setting up distributor in the low-pressure turbine of Shika-2 in Hokuriku Electric Power Company, development of rapid estimation method of release radioactivity and application of high density neutron source to nuclear transmutation of nuclear fuel cycle and introduction of new core monitor system by The Kansai Electric Power Co., Inc., upgrade of investigation of the effects of hot waste water and development of detector for dropout parts of cooling system in reactor by Shikoku Electric Power Co., Inc., change of transformer in Sendai-1 by Kyushu Electric Power Co., Inc., and reactor core design for Oma ABWR by J-Power. The Japan Atomic Power Company reported four articles such as development of technologies for established nuclear power plants, promotion of Tsuruga-3 and Tsuruga-4, application of clearance system in Japan and development of future reactors. (S.Y.)

  7. Power exchange game in the electricity market

    International Nuclear Information System (INIS)

    Pyykko, S.; Partanen, J.; Viljainen, S.; Lassila, J.; Honkapuro, S.; Tahvanainen, K.

    2006-01-01

    Since it is not economically reasonable to build parallel electricity networks, in Finland, Sweden, Norway and Denmark, electricity distribution is protected by monopoly. However, electricity production and selling have been opened up to competition by connecting the transmission networks of these countries together, and it is possible to produce electricity where it is cheapest. A common electricity power market, called Nord Pool, has been created where electricity can be bought, sold or used as an exchange product. In order to help students understand the operation of electricity markets and the use of different electricity exchange products, the Department of Electrical Engineering at Lappeenranta University developed a scheme in which the theory can be used in practice. In the scheme, students are given the responsibility to manage the electricity markets of power companies in order analyze, plan and make decisions, which are skills required on the open power markets. The paper provided an introduction to the electricity markets in Nordic countries and discussed Nord Pool and its products. Information about education at the Department of Electrical Engineering at Lappeenranta University of Technology was also presented. The paper also provided details of the power exchange scheme on the electricity markets. 6 refs., 17 figs

  8. Energy, electricity and nuclear power

    International Nuclear Information System (INIS)

    Reuss, P.; Naudet, G.

    2008-01-01

    After an introduction recalling what energy is, the first part of this book presents the present day energy production and consumption and details more particularly the electricity 'vector' which is an almost perfect form of energy despite the fact that it is not a primary energy source: it must be generated from another energy source and no large scale storage of this energy is possible. The second part of the book is devoted to nuclear energy principles and to the related technologies. Content: 1 - What does energy mean?: the occurrence of the energy concept, the classical notion of energy, energy notion in modern physics, energy transformations, energy conservation, irreversibility of energy transformations, data and units used in the energy domain; 2 - energy production and consumption: energy systems, energy counting, reserves and potentialities of energy resources, production of primary energies, transport and storage of primary energies, energy consumption, energy saving, energy markets and prices, energy indicators; 3 - electric power: specificity of electricity and the electric system, power networks, power generation, electricity storage, power consumption and demand, power generation economics, electricity prices and market; 4 - physical principles of nuclear energy: nuclei structure and binding energy, radioactivity and nuclear reactions, nuclear reactions used in energy generation, basics of fission reactors physics; 5 - nuclear techniques: historical overview, main reactor types used today, perspectives; 6 - fuel cycle: general considerations, uranium mining, conversion, enrichment, fuel fabrication, back-end of the cycle, plutonium recycle in water cooled reactors; 7 - health and environmental aspects of nuclear energy: effects on ionizing radiations, basics of radiation protection, environmental impacts of nuclear energy, the nuclear wastes problem, specific risks; 8 - conclusion; 9 - appendixes (units, physics constants etc..)

  9. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  10. Simulation of power plant construction in competitive Korean electricity market

    International Nuclear Information System (INIS)

    Ahn, Nam Sung; Huh, Sung Chul

    2001-01-01

    power plant. Under these postulations, there is the potential for power plant construction to appear in waves causing alternating periods of over and under supply of electricity like commodity production or real estate construction. A computer model was developed to study the possibility that construction will appear in waves of boom and burst in Korean electricity market. This model was constructed using System Dynamics method pioneered by Forrester (MIT, 1961) and explained in recent text by Sternman (Business Dynamics, MIT, 2000) and the recent work by Andrew Ford (Energy Policy, 1999). This model was designed based on the Energy Policy results (Ford, 1999) with parameters for loads and resources in Korea. This Korea Market Model was developed and tested in a small scale project to demonstrate the usefulness of the System Dynamics approach, Korea electricity market is isolated and not allowed to import electricity from outsides. In this model, the base load such as nuclear and large coal power plant are assumed to be user specified investment and only CCGT is selected for new investiment by investors in the market. This model may be used to learn if government investment in new nuclear plants could compensate for the unstable actions of private developers. This model can be used to test the policy focused on the role of nuclear investments over time. This model also can be used to test whether the future power plant construction can meet the government targets for the mix of generating resources and to test whether to maintain stable price in the spot market

  11. The french electric power evaluation 2005

    International Nuclear Information System (INIS)

    2006-01-01

    This document takes stock on the french electric power situation for the year 2005. It provides information on the consumption the trade, the production, the french market and the RTE (Electric power transport network) infrastructure. (A.L.B.)

  12. Sustainable model for financial viability of decentralized biomass gasifier based power projects

    International Nuclear Information System (INIS)

    Palit, Debajit; Malhotra, Ramit; Kumar, Atul

    2011-01-01

    This paper made a modest attempt for designing a sustainable model for financial viability of biomass gasifier power projects for enhancing electricity access in India and other developing countries. For long term sustainability of distributed generation projects in remote rural areas, viability from both project implementing agency (PIA) and the end-users need to be ensured. The minimum required prices of electricity from both PIA and end-user perspective have been estimated. While for PIA the cost recovery is the key for viability, the affordability to pay the electricity cost is crucial for the end users. Analysis carried out in this paper on the basis of data obtained from operational projects implemented in India reveal that it is essential to operate the system at a higher capacity utilization factor. While this can be achieved though creating convergence with locally relevant economic activity, it is also observed that micro-enterprises cannot pay beyond a certain price of electricity to keep it sustainable. This paper sets forth a case for developing a regulatory mechanism to extend the tariff fixation for the projects and providing cross-subsidies to ensure long term sustainability of off-grid project. - Highlights: → We design sustainable financial model for viability of biomass gasifier projects. → Analysis based on field data obtained from operational projects in India. Estimated electricity pricing from both implementing agency and end-users perspective. → A regulatory mechanism for tariff fixation and cross subsidization is recommended.

  13. Calculation of electrical and magnetic field in electric power transmission lines aiming project optimization, environmental impact and alternatives comparisons; O calculo dos campos eletrico e magnetico de L.T. visando a otimizacao do projeto, o impacto ambiental e a comparacao de alternativas

    Energy Technology Data Exchange (ETDEWEB)

    Portela, Carlos M. [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE); Moreno O, German [Antioquia Univ., Medellin (Colombia). Dept. de Engenharia Eletrica

    1995-12-31

    The optimization of overhead electric power transmission lines leads to compact projects in which the neighbourhood electric and magnetic field are a critical restriction. The Load Simulation Method enables the reliable calculation of such fields. Presented are equations for the application of such conditions. Results are presented 9 figs., 2 tabs., 10 refs.

  14. Review of Aircraft Electric Power Systems and Architectures

    DEFF Research Database (Denmark)

    Zhao, Xin; Guerrero, Josep M.; Wu, Xiaohao

    2014-01-01

    In recent years, the electrical power capacity is increasing rapidly in more electric aircraft (MEA), since the conventional mechanical, hydraulic and pneumatic energy systems are partly replaced by electrical power system. As a consequence, capacity and complexity of aircraft electric power...... systems (EPS) will increase dramatically and more advanced aircraft EPSs need to be developed. This paper gives a brief description of the constant frequency (CF) EPS, variable frequency (VF) EPS and advanced high voltage (HV) EPS. Power electronics in the three EPS is overviewed. Keywords: Aircraft Power...... System, More Electric Aircraft, Constant Frequency, Variable Frequency, High Voltage....

  15. Methods of formation of efficiency indexes of electric power sources integration in regional electric power systems

    International Nuclear Information System (INIS)

    Marder, L.I.; Myzin, A.I.

    1993-01-01

    A methodic approach to the grounding of the integration process efficiency within the Unified electric power system is given together with the selection of a rational areal structure and concentration of power-generating source capacities. Formation of an economic functional according to alternative scenavies including the cost components taking account of the regional interests is considered. A method for estimation and distribution of the effect from electric power production integration in the power systems under new economic conditions is proposed

  16. NSTX Electrical Power Systems

    International Nuclear Information System (INIS)

    A. Ilic; E. Baker; R. Hatcher; S. Ramakrishnan; et al

    1999-01-01

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in the Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems

  17. Import of electric power increased by 19 %

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The import of electric power increased by 19% in 1999. Due to the decrease in the electric power export the net import of electric power increased even more. Electric power import from Sweden was 6000 GWh, import from Russia 5200 GWh and import from Norway 100 GWh. The electric power export in 1999 was only 200 GWh. The generation of nuclear power increased 5% and the consumption of wood-based fuels by 3%. The increase in nuclear power generation is based on increment of the power output capacities of the power plants. The consumption of peat decreased by 12% and the production of hydroelectric power by 15%. The decrement of the peat consumption is based on the changes in energy taxation. The production of hydroelectric power decreased to the normal level after the rainy year 1998. Oil consumption remained nearly the same as in 1998 even though the national product increased in 1999 by 3.5%. The wind power generation was doubled in 1999. The share of it is still only about 0.01% of the total energy consumption. Carbon dioxide emissions from coal and peat, decreased by 1.0 million tons, down to 56 million tons. The present emissions are now only about 2 million tons higher than during the reference year 1990. The emissions have decreased by 5 million tons since 1996 when they were at their highest

  18. Applying reliability analysis to design electric power systems for More-electric aircraft

    Science.gov (United States)

    Zhang, Baozhu

    The More-Electric Aircraft (MEA) is a type of aircraft that replaces conventional hydraulic and pneumatic systems with electrically powered components. These changes have significantly challenged the aircraft electric power system design. This thesis investigates how reliability analysis can be applied to automatically generate system topologies for the MEA electric power system. We first use a traditional method of reliability block diagrams to analyze the reliability level on different system topologies. We next propose a new methodology in which system topologies, constrained by a set reliability level, are automatically generated. The path-set method is used for analysis. Finally, we interface these sets of system topologies with control synthesis tools to automatically create correct-by-construction control logic for the electric power system.

  19. New electric power market

    International Nuclear Information System (INIS)

    Zorzoli, G.B.

    1992-01-01

    In a trend analysis of methods of energy production and use, this paper cites forecasted significant gains in efficiency through the use of combined cycles for heat and power production, and rapidly falling costs of solar and wind power plants. A technical/economic feasibility analysis is then performed on the future use of electric vehicles in Italy. Here, the paper cites the possible benefits in terms of energy conservation and air pollution abatement. A review is made of current progress in research efforts aimed at reducing electric battery sizing, weight and recharging constraints

  20. JPL's electric and hybrid vehicles project: Project activities and preliminary test results. [power conditioning and battery charge efficiency

    Science.gov (United States)

    Barber, T. A.

    1980-01-01

    Efforts to achieve a 100 mile urban range, to reduce petroleum usage 40% to 70%, and to commercialize battery technology are discussed with emphasis on an all plastic body, four passenger car that is flywheel assisted and battery powered, and on an all metal body, four passenger car with front wheel drive and front motor. For the near term case, a parallel hybrid in which the electric motor and the internal combustion engine may directly power the drive wheels, is preferred to a series design. A five passenger car in which the electric motor and the gasoline engine both feed into the same transmission is discussed. Upgraded demonstration vehicles were tested using advanced lead acid, nickel zinc, nickel iron, and zinc chloride batteries to determine maximum acceleration, constant speed, and battery behavior. The near term batteries demonstrated significant improvement relative to current lead acid batteries. The increase in range was due to improved energy density, and ampere hour capacity, with relatively 1 small weight and volume differences.

  1. Outlook for Global Nuclear Power: Energy, Electricity and Nuclear Power Estimates for the Period up to 2050

    International Nuclear Information System (INIS)

    Gritsevskyi, A.

    2016-01-01

    Nuclear power's global expansion is projected to continue in the coming decades - albeit at a slowing pace - amid challenges including low fossil fuel prices, a sluggish world economy and the legacy of Japan's Fukushima Daiichi accident. Each year, the IAEA publishes projections of the world's nuclear power generating capacity in Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, now in its 35th edition.The latest projections point to slower growth in nuclear power, in keeping with the trend since the 2011 Fukushima Daiichi accident. The world's nuclear power generating capacity is projected to expand by 2.4 percent by 2030, according to the low projections, compared with 7.7 percent estimated in 2014. In the high case, generating capacity is estimated to grow by 68 percent by 2030, versus 88 percent forecast last year. Uncertainty related to energy policy, license renewals, shutdowns and future constructions accounts for the wide range.The estimates also factor in the likely future retirement of many of the world's 438 nuclear reactors currently in operation, more than half of which are over 30 years old. Despite the need to replace scores of retiring reactors, nuclear power is still set to maintain - and possibly increase - its role in the world's low-carbon energy mix. It's important to understand that these projections, while carefully derived, are not predictions.The estimates should be viewed as very general growth trends, whose validity must be constantly subjected to critical review.(author).

  2. Air pollution health effects of electric power generation

    International Nuclear Information System (INIS)

    1975-11-01

    stitutt for Atomenergi (IFA) and Norsk Institutt for Luftforskning (NILU) have undertaken a joint project with the ultimate purpose of comparing the relative air pollution health effects of gas-fired, oil-fired and uranium-fueled electric power generating plants. Phase I of the project includes a literature review on pollutant emissions and their health effects. The methods which have previouously been used to compare the relative health effects are also reviewed. The radioactive effluents from nuclear power plants are tabulated and the health effects discussed on the basis of data from Hiroshima and Nagasaki, medical irradiation therapy and studies of USAEC and UKAEA employees. It is pointed out that there is no indication that chronic low-level radiation has somatic effects, and the Japanese data gives no conclusive indication of genetic effects. Background irradiation in Kerala and Guarapari and in USA is also cited. Following a brief presentation of the principal air pollutants from fossil fuels a number of studies of 'smog' incidents in the UK and USA are discussed, and a prediction equation based on multiple regression analysis is presented. Finally the methods of comparing the health effects from nuclear and fossil-fuel plants are discussed. In an appendix Lave and Freeburg's study 'Health effects of electricity generation from coal, oil and nuclear fuel' is evaluated. (JIW)

  3. Power Electronics and Electric Machines Facilities | Transportation

    Science.gov (United States)

    Research | NREL Facilities Power Electronics and Electric Machines Facilities NREL's power electronics and electric machines thermal management experimentation facilities feature a wide range of four researchers in discussion around a piece of laboratory equipment. Power electronics researchers

  4. Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

    International Nuclear Information System (INIS)

    1992-06-01

    The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC's Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE's share of the project cost will be 50 percent, or $134,996,550

  5. 18 CFR 801.12 - Electric power generation.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Electric power generation. 801.12 Section 801.12 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION GENERAL POLICIES § 801.12 Electric power generation. (a) Significant uses are presently being made...

  6. Electric power annual 1998. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    The purpose of this report, Electric Power Annual 1998 Volume 1 (EPAVI), is to provide a comprehensive overview of the electric power industry during the most recent year for which data have been collected, with an emphasis on the major changes that occurred. In response to the changes of 1998, this report has been expanded in scope. It begins with a general review of the year and incorporates new data on nonutility capacity and generation, transmission information, futures prices from the Commodity futures Trading commission, and wholesale spot market prices from the pennsylvania-new Jersey-Maryland Independent System Operator and the California Power Exchange. Electric utility statistics at the Census division and State levels on generation, fuel consumption, stocks, delivered cost of fossil fuels, sales to ultimate customers, average revenue per kilowatthour of electricity sold, and revenues from those retail sales can be found in Appendix A. The EPAVI is intended for a wide audience, including Congress, Federal and State agencies, the electric power industry, and the general public.

  7. Defence in depth for electric power supplies in Indian nuclear power plants

    International Nuclear Information System (INIS)

    Gupta, S.K.; Srivasista, K.; Solanki, R.B.

    2009-01-01

    The purpose of electric power supply system in a nuclear power plant is to supply and distribute reliable electric power to safety related systems and systems important to safety in various forms, arrangements and combinations of redundancy and diversity in order to perform safety functions required during operational states and design basis events (DBE) such as shutting down the reactor, maintaining the reactor in safe shutdown state, containment isolation and reactor core cooling preventing significant release of radioactive material to the environment. Hence the design basis of electric power supply systems includes identification of DBE that require power supplies, adequacy of redundancy and diversity, environmental conditions to which electric equipment are qualified, identification of loads requiring interrupted and uninterrupted power supplies, time sequence in which emergency loads are to be supplied in case of interruption, provisions for maintaining and testing, consideration for minimum duration capability of emergency power supplies during station blackout etc. Based on operation experience, results of probability safety assessment and certain weaknesses noticed in defence in depth of electric power supply systems, several continuous design improvements have been made in Indian nuclear power plants during operating phase and life extension. Instituting various tests during initial commissioning, subsequent operation and life extension has ensured high standards of performance of electric power supplies. Some of these aspects are highlighted in this paper

  8. Innovation in electric power technologies in 2009

    International Nuclear Information System (INIS)

    Ohfusa, Takahiro; Hayasaka, Eiji; Ino, Hiroyuki

    2010-01-01

    This is a report of the title by Tokyo Electric Power Company, Kansai Electric Power Co., Inc, Tohoku Electric Power and other nine enterprises in Japan. The outline is as follows. Tokyo Electric Power Company stated pipe thinning by the hot water based two-phase flow testing device, development of technologies for corrosion protection of nuclear reactor using titanium oxide, evaluation of fatigue damage by EBSD, and study of duty on the nuclear power plant. Japan Atomic Power Company (JAPC) stated the mechanism of decrease in exposure dose of the primary coolant system by zinc infusion, outline of Air Operated Valve Intelligent Diagnostic Analysis System (AVIDAS) and the grand packing system, development of SAPLS, the automatic search program of fuel position for design of PWR related core, development of compact containment water reactor (CCR) and FBR cycle system, investigation of the chain destruction of active fault under consideration of dynamic interaction of active faults and decommissioning of Tokai Nuclear Power Plant. Electric Power Development Company reported construction of the Oma Nuclear Power Plant, a future nuclear plant in Oma, Aomori. The reactor will be capable of using 100% MOX fuel core (MOX-ABWR). The operation will start November 2014. (S.Y.)

  9. Electric Power Monthly, August 1990. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    1990-11-29

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and State level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data includes generation by energy source (coal, oil, gas, hydroelectric, and nuclear); generation by region; consumption of fossil fuels for power generation; sales of electric power, cost data; and unusual occurrences. A glossary is included.

  10. Blown by the wind. Replacing nuclear power in German electricity generation

    International Nuclear Information System (INIS)

    Lechtenböhmer, Stefan; Samadi, Sascha

    2013-01-01

    Only three days after the beginning of the nuclear catastrophe in Fukushima, Japan, on 11 March 2011, the German government ordered 8 of the country's 17 existing nuclear power plants (NPPs) to stop operating within a few days. In summer 2011 the government put forward a law – passed in parliament by a large majority – that calls for a complete nuclear phase-out by the end of 2022. These government actions were in contrast to its initial plans, laid out in fall 2010, to expand the lifetimes of the country's NPPs. The immediate closure of 8 NPPs and the plans for a complete nuclear phase-out within little more than a decade, raised concerns about Germany's ability to secure a stable supply of electricity. Some observers feared power supply shortages, increasing CO 2 -emissions and a need for Germany to become a net importer of electricity. Now – a little more than a year after the phase-out law entered into force – this paper examines these concerns using (a) recent statistical data on electricity production and demand in the first 15 months after the German government's immediate reaction to the Fukushima accident and (b) reviews the most recent projections and scenarios by different stakeholders on how the German electricity system may develop until 2025, when NPPs will no longer be in operation. The paper finds that Germany has a realistic chance of fully replacing nuclear power with additional renewable electricity generation on an annual basis by 2025 or earlier, provided that several related challenges, e.g. expansion of the grids and provision of balancing power, can be solved successfully. Already in 2012 additional electricity generation from renewable energy sources in combination with a reduced domestic demand for electricity will likely fully compensate for the reduced power generation from the NPPs shut down in March 2011. If current political targets will be realised, Germany neither has to become a net electricity importer, nor will be unable

  11. Nuclear electric propulsion: An integral part of NASA's nuclear propulsion project

    International Nuclear Information System (INIS)

    Stone, J.R.

    1992-01-01

    NASA has initiated a technology program to establish the readiness of nuclear propulsion technology for the Space Exploration Initiative (SEI). This program was initiated with a very modest effort identified with nuclear thermal propulsion (NTP); however, nuclear electric propulsion (NEP) is also an integral part of this program and builds upon NASA's Base Research and Technology Program in power and electric propulsion as well as the SP-100 space nuclear power program. Although the Synthesis Group On America's SEI has identified NEP only as an option for cargo missions, recent studies conducted by NASA-Lewis show that NEP offers the potential for early manned Mars missions as well. Lower power NEP is also of current interest for outer planetary robotic missions. Current plans are reviewed for the overall nuclear propulsion project, with emphasis on NEP and those elements of NTP program which have synergism with NEP

  12. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  13. Fitting of power generated by nuclear power plants into the Hungarian electricity system

    International Nuclear Information System (INIS)

    Lengyel, Gyula; Potecz, Bela

    1984-01-01

    The moderate increase of electrical energy demands (3% at present) can only be met by the parallel application of fossil and nuclear power plants and by electric power import via the transmission lines of the CMEA countries. The changes in the electrical energy and fuel demands and the development of the available capacities during the last 35 years are reviewed. The major purpose of Hungarian power economy is to save hydrocarbon fuels by taking advantages of power import opportunities by operating nuclear power plants at maximum capacity and the coal fired power stations at high capacity. The basic principles, the algorithm applied to optimize the load distribution of the electrical power system are discussed in detail with special attention to the role of nuclear power. The planned availability of nuclear power plants and the amount of electricity generated by nuclear plants should also be optimized. (V.N.)

  14. Project finance and its limitations in terms of difficult political and structural horizons - the case of electricity generation

    International Nuclear Information System (INIS)

    Fiancette, Georges; Penz, Philippe

    1994-01-01

    Illustrations are given of the kinds of difficulties attendant on the project financing of electricity generation in some developing countries and former socialist countries of Eastern Europe. There are risks due to the instability of the legal framework because of political considerations and also because the organization and regulation of the electricity supply industry is still being developed. Problems may arise because of the gap between the relatively short term of the repayable debt (10 to 12 years) and the lifetime of a typical project (of the order of 30 years). Project investment is usually entrusted to an independent body which often relies on the local electricity company to operate the power station. In this situation, the two bodies involved cannot mutually insure the risks. Exchange rates generate problems associated with convertibility on the one hand and fluctuations on the other. The particular problems which occur in the project financing of power station restoration are discussed. (UK)

  15. New record in import of electric power in 2000

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    In spite of the mild weather in the year 2000 the electric power consumption in Finland increased by nearly 2%. The electric power consumption would be twice as high if the temperatures would have been the same as usually. Hydroelectric power generation in Norway, Sweden and Finland in 2000 was about 40 TWh higher than in 1999. The retained import of electric power in the year 2000 reached a new record, being 11.9 TWh, corresponding to 15% of the annual power consumption in Finland. The GNP in Finland increased in 2000 by 5.7%, and the estimate for 2001 is 4.5%. Total power consumption in Finland in 2000 was 79.1 TWh, which is 1.7% higher than in 1999. About 60% of the increase were covered by import of electric power and 40 % by increasing own power generation. The share of CHP production was 31% of the total power consumption, the share of nuclear power being 27%, the share of hydroelectric power 18% and that of coal and other common condensing power about 8%. The share of retained electric power import was 15%. The Finnish hydroelectric power plants generated 14.4 TWh electric power, which is nearly 15% more than in 1999. Due to the increased production of hydroelectric power and power import the production of coal and other condensing power decreased nearly 9%. The wind power generation increased rapidly being, however, only about 0.1% of the electric power consumption. Industrial power consumption was about 55% of the total, the share of households and agriculture being nearly 24%, and those of services and public sector over 17%. Power transmission and delivery losses were less than 4%. The electric power consumption of households decreased by nearly 2% due to the worm end of the year. The share of other consumers increased by nearly 3%. About 13 000 households acquired electric heating, so the number of electrically heated houses in Finland is 593 000 households. The industrial electric power consumption increased in 2000 by 2.7% up to 43.2 TWh. The share of

  16. The Value of Wind Technology Innovation: Implications for the U.S. Power System, Wind Industry, Electricity Consumers, and Environment

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu T [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Lantz, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Mowers, Matthew [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Wiser, Ryan [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-21

    Improvements to wind technologies have, in part, led to substantial deployment of U.S. wind power in recent years. The degree to which technology innovation will continue is highly uncertain adding to uncertainties in future wind deployment. We apply electric sector modeling to estimate the potential wind deployment opportunities across a range of technology advancement projections. The suite of projections considered span a wide range of possible cost and technology innovation trajectories, including those from a recent expert elicitation of wind energy experts, a projection based on the broader literature, and one reflecting estimates based on a U.S. DOE research initiative. In addition, we explore how these deployment pathways may impact the electricity system, electricity consumers, the environment, and the wind-related workforce. Overall, our analysis finds that wind technology innovation can have consequential implications for future wind power development throughout the United States, impact the broader electricity system, lower electric system and consumer costs, provide potential environmental benefits, and grow the U.S. wind workforce.

  17. Electric Power Monthly, July 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-12

    The Electric Power Monthly (EPM) is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost in fuel. Quantity, quality, and cost of fuel data lag the net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour data by 1 month. This difference in reporting appears in the national, Census division, and State level tables. However, at the plant level, all statistics presented are for the earlier month for the purpose of comparison. 12 refs., 4 figs., 48 tabs.

  18. Electrical Power Budget for FCC-ee

    CERN Document Server

    Aull, S.; Bozzini, D.; Brunner, O.; Burnet, J.-P.; Butterworth, A.; Calaga, R.; Jensen, E.; Mertens, V.; Milanese, A.; Nonis, M.; Oide, K.; Schwerg, N.; Tavian, L.; Wenninger, J.; Zimmermann, F.; Rinolfi, L; Blondel, A.; Koratzinos, M.; Gorgi Zadeh, S.

    2016-01-01

    We present a first rough estimate for the electrical power consumption of the FCC-ee lepton collider. This electrical power is dominated by the RF system, which provides the motivation for the ongoing R&D on highly efficient RF power sources. Other contributions come from the warm arc magnets, the cryogenics systems, cooling, ventilation, general services, the particle-physics detectors, and the injector complex.

  19. Values in the electric power industry

    Energy Technology Data Exchange (ETDEWEB)

    Sayre, K. (ed.)

    1977-01-01

    A basic conclusion established by the seven essays presented is that nowhere within the complex decision-making process of the electric power industry is there any provision for systematically considering the curtailment of consumption as a serious alternative to continued expansion of power production. Six recommendations are summarized for concrete steps toward remedying this deficiency as a result of examining the essays. Continued expansion of power generation could result in desirable consequences of economic growth, jobs, ready transportation, and many consumer conveniences; undesirable consequences are: increasing air and water pollution, further depletion of nonrenewable resources, and increased dependence on foreign sources of energy. The papers are: A Cybernetic Analysis of Certain Energy Consumption Patterns, by Kenneth Sayre; Social and Environmental Value in Power Plant Licensing: A Study in the Regulation of Nuclear Power by Vaughn McKim; Legal and Economic Aspects of the Electric Utility's ''Mandate to Serve'', by Charles Murdock; Economies of Scale in the Electric Power Industry, by Kenneth Jameson; Dynamics of Growth in the U.S. Electric Power Industry, by Ellen Maher; Utilitarianism and Cost-Benefit Analysis: An Essay on the Relevance of Moral Philosophy to Bureaucratic Theory, by Alasdair MacIntyre; and An Ethical Analysis of Power Company Decision-Making, by Kenneth Goodpaster and Kenneth Sayre. (MCW)

  20. Engineering of electrical systems of nuclear power stations for improved reliability

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Ramanathan, K.; Choudhary, N.N.

    1977-01-01

    Operational problems experienced in electrical systems/equipment of the Tarapur Atomic Power Station (TAPS) and the Rajasthan Atomic Power Station (RAPS) and their solutions are dealt in detail. This experience has led to new design concepts which are being introduced for improved reliability in design of the Madras Atomic Power Project (MAPP) and the Narora Atomic Power Project (NAPP). Saline pollution on switchyard equipments was the major problem of the TAPS due to its coastal location. Saline pollution resulted in flash over of insulators and failure of clamps. The problem was solved by suitable changes in insulators, conductors, transformers, switches and arranging portable live line washing of the switchyard equipment. In MAPP which is also located on coast, an indoor switchyard is built. NAPP is located in a seismic zone, therefore, all equipment is specified for appropriate seismic duty. Various other improvements are described. (M.G.B.)

  1. Energy, Electricity and Nuclear Power Estimates for the Period up to 2030. 2009 Ed

    International Nuclear Information System (INIS)

    2009-01-01

    Reference Data Series No. 1 is an annual publication - currently in its twenty-ninth edition - containing estimates of energy, electricity and nuclear power trends up to the year 2030. The future growth of energy, electricity and nuclear power up to the year 2030 is presented as low and high estimates in order to encompass the uncertainties associated with the future. These estimates should be viewed as very general growth trends whose validity must constantly be subjected to critical review. The energy forecasts carried out in increasing numbers over the last years by international, national and private organizations are based on a multiplicity of different assumptions and different aggregating procedures, which make their comparison and synthesis very difficult. The basic differences refer to such fundamental input data as: - World and regional scenarios of economic development; - Correlation of economic growth and energy consumption; - Assumptions on physical, economic and political constraints applying to energy production and consumption; - Future prices of different energy sources. The projections presented in this booklet are based on a compromise among: - National projections supplied by each country for a recent OECD/NEA study; - Indicators of development published by the World Bank in its World Development Indicators; - Estimates of energy, electricity and nuclear power growth continuously carried out by the IAEA in the wake of recent global and regional projections made by other international organizations

  2. Energy, electricity and nuclear power estimates for the period up to 2030. 2008 ed

    International Nuclear Information System (INIS)

    2008-01-01

    Reference Data Series No. 1 is an annual publication containing estimates of energy, electricity and nuclear power trends up to the year 2030. The future growth of energy, electricity and nuclear power up to the year 2030 is presented as low and high estimates in order to encompass the uncertainties associated with the future. These estimates should be viewed as very general growth trends whose validity must constantly be subjected to critical review. The energy forecasts carried out in increasing numbers over the last years by international, national and private organizations are based on a multiplicity of different assumptions and different aggregating procedures, which make their comparison and synthesis very difficult.The basic differences refer to such fundamental input data as: World and regional scenarios of economic development; Correlation of economic growth and energy consumption; Assumptions on physical, economic and political constraints applying to energy production and consumption; Future prices of different energy sources. The projections presented in this booklet are based on a compromise among: National projections supplied by each country for a recent OECD/NEA study; Indicators of development published by the World Bank in its World Development Indicators; Estimates of energy, electricity and nuclear power growth continuously carried out by the IAEA in the wake of recent global and regional projections made by other international organizations

  3. Demands on project management of comprehensive modernization projects in the electrical systems area. Example of modernization of electrical systems of Kozloduy NPP Unit 5 and 6

    International Nuclear Information System (INIS)

    Stinshoff, Helmut; Weber, Patrick

    2006-01-01

    In nuclear power plants, station supply with electric energy must be guaranteed any time. This applies in particular also during the implementation of complex electrical systems modernization projects. Highest demands on the project management, extensive experience and system knowledge are required. In the frame of the Modernization Program for the nuclear power plant Kozloduy unit 5 and 6 in Bulgaria Framatome ANP has approved its ability to implement a large scope of modernization measures during the refueling outages of the years 2003 to 2005. The Contract of the Modernization Program for the European Consortium Kozloduy (Framatome ANP, Atomenergoexport) was signed in July 1999 and became effective in June 2001. The project will be finished by May 2006, with the approval of the Updated Final Safety Analysis Report. The scope of hardware work has been implemented within 6 plant outages during the years 2002 to 2005. The focus of the Modernization Program is mainly oriented to nuclear safety aspects, with the aim of upgrading of the Units to a high safety level in compliance with international practice. A further section of the project is dedicated to upgrading of operational equipment. Framatome ANP personnel have shown that besides the technical challenges which had to be faced, also the intercultural and language barriers were successfully overcome. The good teamwork between the partners of the Consortium ECK, its Bulgarian subcontractors and with Kozloduy plant personnel has been an important success factor. (authors)

  4. The market for, and economics of, cogeneration and independent power projects in a competitive environment

    International Nuclear Information System (INIS)

    McLeese, R.

    1999-01-01

    A corporate review of Access Capital Corporation was presented. The company is a financial advisor for the development and ownership of electric power projects. The company has expertise in various technologies including gas-fired cogeneration, hydro energy, biomass, renewables and district heating. This presentation included a series of overhead viewgraphs which focused on: (1) the restructuring of Ontario's electricity market, (2) future private power requirements, (3) economics of IPP technologies, (4) pros and cons of on-site power generation, (5) rates paid for private power supply, and (6) financial restructuring of current NUG power purchase contracts. 2 tabs., 6 figs

  5. Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Rick Meeker; L. Baldwin; Steinar Dale; Alexander Domijan; Davild Larbalestier; Hui Li; Peter McLaren; Sastry Pamidi; Horatio Rodrigo; Michael Steurer

    2010-03-31

    Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and

  6. Powering China: Reforming the electric power industry in China

    International Nuclear Information System (INIS)

    Yi-Chong Xu

    2002-01-01

    The book reports on the rapidly changing face of the electricity business in China. Reforms by the central government and the need for more and more electric power have pushed the electricity sector from a central planned economy to a markets-based system. The international ramifications of China's reform programme are discussed. The author describes electricity industry reform in other countries including the USA and UK. The author points out that in China after 1998 there was a move to recentralise control but by then it was too late to reverse the reforms. The problems of tariff policies, pricing, and sources of new investments, including from foreign countries, are discussed. The final section of the book deals with problems arising from the need for massive retrenchment of power-section workers, cross-subsidies, and triangular debts. The book is said to provide a sound description of the political economy of power reform in China without getting bogged down in economic modelling

  7. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  8. Building the feedback system of project experience,and expediting the scientific development of nuclear power construction

    International Nuclear Information System (INIS)

    Zhou Hai

    2009-01-01

    In accord with the status of the energy structure and electric power demand in China, the Chinese government has made the strategy of developing nuclear power actively. Confronting the good chance for nuclear power development, the writer takes the Fangjiashan nuclear power project as an example, puts forward a viewpoint that establishing the nuclear power project experience summarization and feedback system is an urgent need for expediting the scientific development of nuclear power. It also demonstrates the necessity, feasibility, and detailed measures, etc. (authors)

  9. The future of fission-electric power

    International Nuclear Information System (INIS)

    Morowski, J.V.

    1983-06-01

    Future worldwide electricity supply needs dictate the necessity of maintaining a sound capability for electricity and electric power generating facilities, including nuclear, as viable export commodities. A survey of fission-power plant types and the status of worldwide nuclear electric power illustrates the primary emphasis on LWR's and HWR's as two leading types in the export market. This survey examines the factors affecting the market prospects for the next five to fifteen years and provides a discussion on some possible improvements to current market circumstances. A comparative description is provided for some of the types of LWR and CANDU characteristics such as quantities, schedules, constructability factors, and equipment and system. Important factors in the selection process for future nuclear power plants are discussed. Some factors included are seismic design requirements; plant design description and possible site layout; plant protection, control and instrumentation; thermal cycle design and arrangement; and special construction and rigging requirements

  10. ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

    Energy Technology Data Exchange (ETDEWEB)

    GRAY BJ

    2007-11-26

    This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

  11. Electric power in Canada 1993

    International Nuclear Information System (INIS)

    1994-01-01

    The electric power industry in Canada in 1993 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Information is appended on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 26 figs., 90 tabs

  12. Demonstration tokamak fusion power plant for early realization of net electric power generation

    International Nuclear Information System (INIS)

    Hiwatari, R.; Okano, K.; Asaoka, Y.; Shinya, K.; Ogawa, Y.

    2005-01-01

    A demonstration tokamak fusion power plant Demo-CREST is proposed as the device for early realization of net electric power generation by fusion energy. The plasma configuration for Demo-CREST is optimized to satisfy the electric breakeven condition (the condition for net electric power, P e net = 0 MW) with the plasma performance of the ITER reference operation mode. This optimization method is considered to be suitable for the design of a demonstration power plant for early realization of net electric power generation, because the demonstration power plant has to ensure the net electric generation. Plasma performance should also be more reliably achieved than in past design studies. For the plasma performance planned in the present ITER programme, net electric power from 0 to 500 MW is possible with Demo-CREST under the following engineering conditions: maximum magnetic field 16 T, thermal efficiency 30%, NBI system efficiency 50% and NBI current drive power restricted to 200 MW. By replacing the blanket system with one of higher thermal efficiency, a net electric power of about 1000 MW is also possible so that the performance of the commercial plant with Demo-CREST can also be studied from the economic point of view. The development path from the experimental reactor 'ITER' to the commercial plant 'CREST' through the demonstration power plant 'Demo-CREST' is proposed as an example of the fast track concept. (author)

  13. Minnesota Agri-Power Project. Quarterly report, January--March, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Wilbur, D.

    1998-05-01

    The Minnesota Valley Alfalfa Producers propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota industrial park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project utilizes air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. This progress report describes feedstock testing, feedstock supply system, performance guarantees, sales contracts, environmental permits, education, environment, economy, and project coordination and control.

  14. Electric Power Research in 1988 No. 5

    International Nuclear Information System (INIS)

    1989-06-01

    This book deals with eight fields of electric power, which are study on the high level of confidence of electronic control system with micro computers in a field of generator, study on the emergency scenarios of radiation in nuclear power plant in a field of nuclear energy, research for improvement of record and calculation of SCADA system in a field of supply of electric power, study on the utilization and survey of domestic Bio-mass in a field of energy, and study on the digital communications net for electric power in a field of communication.

  15. Equilibrium pricing in electricity markets with wind power

    Science.gov (United States)

    Rubin, Ofir David

    Estimates from the World Wind Energy Association assert that world total wind power installed capacity climbed from 18 Gigawatt (GW) to 152 GW from 2000 to 2009. Moreover, according to their predictions, by the end of 2010 global wind power capacity will reach 190 GW. Since electricity is a unique commodity, this remarkable expansion brings forward several key economic questions regarding the integration of significant amount of wind power capacity into deregulated electricity markets. The overall dissertation objective is to develop a comprehensive theoretical framework that enables the modeling of the performance and outcome of wind-integrated electricity markets. This is relevant because the state of knowledge of modeling electricity markets is insufficient for the purpose of wind power considerations. First, there is a need to decide about a consistent representation of deregulated electricity markets. Surprisingly, the related body of literature does not agree on the very economic basics of modeling electricity markets. That is important since we need to capture the fundamentals of electricity markets before we introduce wind power to our study. For example, the structure of the electric industry is a key. If market power is present, the integration of wind power has large consequences on welfare distribution. Since wind power uncertainty changes the dynamics of information it also impacts the ability to manipulate market prices. This is because the quantity supplied by wind energy is not a decision variable. Second, the intermittent spatial nature of wind over a geographical region is important because the market value of wind power capacity is derived from its statistical properties. Once integrated into the market, the distribution of wind will impact the price of electricity produced from conventional sources of energy. Third, although wind power forecasting has improved in recent years, at the time of trading short-term electricity forwards, forecasting

  16. Economical aspects of a nuclear power plant project

    International Nuclear Information System (INIS)

    Meldonian, N.L.; Santos, E.M. dos

    1992-01-01

    This work describes different aspects and parameters that should be regarded as guidelines for economic evaluation of small and medium power plant projects. The main objective of an economic evaluation is to establish the plant's unitary cost and its economic figure of merit. To achieve that, a number of studies must be undertaken to compare the global competitiveness of a nuclear power plant with other energetic alternatives. These studies involve macro economy, energy generation, electricity transmission and global feasibility of the enterprise. It is concluded that the economic evaluation of a nuclear power plant should be considered as the culmination of a long process of planning at a national level. The main reasons are the investments involved, the technological developments required and political implications of the utilization of nuclear power energy. (author)

  17. Competitiveness of nuclear power in Japanese liberalized electricity market

    International Nuclear Information System (INIS)

    Abe, Y.

    2006-01-01

    The liberalization of Japanese electricity market expanded to customers of over 50 kV on April 1, 2005 and more than 60% of the market has been already open. The discussion about the assistance measures of nuclear power generation in Japanese liberalization of electricity market has come to grow warmer gradually. The opinions on the competitiveness of nuclear power are inconsistency among the supporters of nuclear power. Some says that nuclear power is the most competitive, others says nuclear power require some sort of financial or political assistance in the deregulation of electricity market. In this study, based on financial statements of each Japanese electric power company, the constitution of generation cost of nuclear power is illustrated and various financial and economic characteristics, including ''merit of scale'' and the impact of new nuclear power plant construction on the finance of electric power company, are discussed. In addition, the economic features of nuclear power generation are compared with those of thermal power generation through the analysis of financial statements. Finally, support policies for nuclear power required in deregulation of electric utilities are examined in terms of fairness of competition and security of electricity supply

  18. Integrating decentralized electrically powered thermal supply systems into a Smart Grid

    OpenAIRE

    Hasselmann, Maike; Beier, Carsten

    2015-01-01

    The goal of the project “Smart Region Pellworm” is the establishment and operation of a smart grid with a hybrid energy storage system on the German island of Pellworm. One part of the project is the integration of power-to-heat appliances into the smart grid for demand side management purposes. This paper deals with the prerequisites and lessons learned from the integration of electric night storage heaters into Pellworm's energy management system. Special focus lies on the development of a ...

  19. The future of electric power supply

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    In this interview with a prominent expert of the electric power industry, problems of assuring electricity supply, the economics of nuclear electricity generation, the supply structure, and cogeneration are discussed. (UA) [de

  20. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  1. Electric power supply in China. Pt. 1

    International Nuclear Information System (INIS)

    Chen Heng

    1987-01-01

    Professor Chen, visiting professor at the RWTH Aachen, gave several lectures dealing with his country, the electric power supply in China and with special research activities of Chinese scientists. This article is based on two of his lectures, and will be published in two parts, the first of which provides a brief description of China, an overview on electric power supply, and a brief description of the large power plants and large electrical subsystems. The second part will deal with operation planning, extension planning as well as with research and development in the field of electric energy supply. (orig.) [de

  2. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken

  3. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken. (Author)

  4. Reduction of regional disparities in electric power prices by spatially effective measures and planning in the Federal Republic of Germany

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, G

    1984-01-01

    For a long time energy policy has been trying to reduce disparities in electric power prices by administrative and financial measures alone. Governmental planning was opening up new prospects when long-range fuel transport - and in particular the transport of hard coal by ship or by rail - was seeing a drop in prices in the mid seventies. Since fuel transport has been lower-priced than the transport of equivalent quantities of electric power, regional disparities in electric power prices which are due to the respective supply structures may be levelled by way of power plant site selection and power plant installation according to the specific regional loads. A decentralized expansion of power generation within reach of the consumer requires but a minimum of wiring. Structural price disparities are reduced in particular in regions importing electric power at excessive prices. In addition, costs may be saved by rational energy utilization consisting above all in the application of dual-purpose power plants and by the rationalization of network infrastuctures. The study abstracted is part of a research project of the Federal Research Institute for Land Studies and Planning. The project is dealing with concepts of decentralized electric power supply and space heating. It adds to already existing related studies which deal above all with the basic problems of scheduling and planning the contents and inner structure of decentralized energy concepts.

  5. Nuclear economics 2000: Deterministic and probabilistic projections of nuclear and coal electric power generation costs for the year 2000

    International Nuclear Information System (INIS)

    Williams, K.A.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1987-06-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base-load nuclear and coal-fired power plants with a startup date of January 2000. For the Midwest region a complete data set that specifies each parameter used to obtain the comparative results is supplied. When based on the reference set of input variables, the comparison of power generation costs is found to favor nuclear in most regions of the country. Nuclear power is most favored in the northeast and western regions where coal must be transported over long distances; however, coal-fired generation is most competitive in the north central region where large reserves of cheaply mineable coal exist. In several regions small changes in the reference variables could cause either option to be preferred. The reference data set reflects the better of recent electric utility construction cost experience (BE) for nuclear plants. This study assumes as its reference case a stable regulatory environment and improved planning and construction practices, resulting in nuclear plants typically built at the present BE costs. Today's BE nuclear-plant capital investment cost model is then being used as a surrogate for projected costs for the next generation of light-water reactor plants. An alternative analysis based on today's median experience (ME) nuclear-plant construction cost experience is also included. In this case, coal is favored in all ten regions, implying that typical nuclear capital investment costs must improve for nuclear to be competitive

  6. Virtual Power Plants of Electric Vehicles in Sustainable Smart Electricity Markets

    NARCIS (Netherlands)

    M.T. Kahlen (Micha)

    2017-01-01

    markdownabstractThe batteries of electric vehicles can be used as Virtual Power Plants to balance out frequency deviations in the electricity grid. Carsharing fleet owners have the options to charge an electric vehicle's battery, discharge an electric vehicle's battery, or keep an electric vehicle

  7. Probabilistic Fault Diagnosis in Electrical Power Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — Electrical power systems play a critical role in spacecraft and aircraft. This paper discusses our development of a diagnostic capability for an electrical power...

  8. Study of aircraft electrical power systems

    Science.gov (United States)

    1972-01-01

    The formulation of a philosophy for devising a reliable, efficient, lightweight, and cost effective electrical power system for advanced, large transport aircraft in the 1980 to 1985 time period is discussed. The determination and recommendation for improvements in subsystems and components are also considered. All aspects of the aircraft electrical power system including generation, conversion, distribution, and utilization equipment were considered. Significant research and technology problem areas associated with the development of future power systems are identified. The design categories involved are: (1) safety-reliability, (2) power type, voltage, frequency, quality, and efficiency, (3) power control, and (4) selection of utilization equipment.

  9. PROVIDING QUALITY OF ELECTRIC POWER IN ELECTRIC POWER SYSTEM IN PARALLEL OPERATION WITH WIND TURBINE

    Directory of Open Access Journals (Sweden)

    Yu. A. Rolik

    2016-01-01

    Full Text Available The problem of providing electric power quality in the electric power systems (EPS that are equipped with sufficiently long air or cable transmission lines is under consideration. This problem proved to be of particular relevance to the EPS in which a source of electrical energy is the generator of wind turbines since the wind itself is an instable primary energy source. Determination of the degree of automation of voltage regulation in the EPS is reduced to the choice of methods and means of regulation of power quality parameters. The concept of a voltage loss and the causes of the latter are explained by the simplest power system that is presented by a single-line diagram. It is suggested to regulate voltage by means of changing parameters of the network with the use of the method of reducing loss of line voltage by reducing its reactance. The latter is achieved by longitudinal capacitive compensation of the inductive reactance of the line. The effect is illustrated by vector diagrams of currents and voltages in the equivalent circuits of transmission lines with and without the use of longitudinal capacitive compensation. The analysis of adduced formulas demonstrated that the use of this method of regulation is useful only in the systems of power supply with a relatively low power factor (cosφ < 0.7 to 0.9. This power factor is typical for the situation of inclusion the wind turbine with asynchronous generator in the network since the speed of wind is instable. The voltage regulation fulfilled with the aid of the proposed method will make it possible to provide the required quality of the consumers’ busbars voltage in this situation. In is turn, it will make possible to create the necessary conditions for the economical transmission of electric power with the lowest outlay of reactive power and the lowest outlay of active power losses.

  10. Analysis of debt leveraging in private power projects

    International Nuclear Information System (INIS)

    Kahn, E.P.; Meal, M.; Doerrer, S.; Morse, S.

    1992-08-01

    As private power (non-utility generation) has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital, and that this leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not home by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs

  11. Analysis of debt leveraging in private power projects

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.P. (Lawrence Berkeley Lab., CA (United States)); Meal, M.; Doerrer, S.; Morse, S. (Morse, Richard, Weisenmiller Associates, Inc., Oakland, CA (United States))

    1992-08-01

    As private power has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital. This leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not borne by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs.

  12. Wind power as an electrical energy source in Illinois

    Science.gov (United States)

    Wendland, W. M.

    1982-03-01

    A preliminary estimate of the total wind power available in Illinois was made using available historical data, and projections of cost savings due to the presence of wind-generated electricity were attempted. Wind data at 10 m height were considered from nine different sites in the state, with three years data nominally being included. Wind-speed frequency histograms were developed for day and night periods, using a power law function to extrapolate the 10 m readings to 20 m. Wind speeds over the whole state were found to average over 8 mph, the cut-in point for most wind turbines, for from 40-63% of the time. A maximum of 75% run-time was determined for daylight hours in April-May. A reference 1.8 kW windpowered generator was used in annual demand projections for a reference one family home, using the frequency histograms. The small generator was projected to fulfill from 25-53% of the annual load, and, based on various cost assumptions, exhibited paybacks taking from 14-27 yr.

  13. Electrical power technology for robotic planetary rovers

    Science.gov (United States)

    Bankston, C. P.; Shirbacheh, M.; Bents, D. J.; Bozek, J. M.

    1993-01-01

    Power technologies which will enable a range of robotic rover vehicle missions by the end of the 1990s and beyond are discussed. The electrical power system is the most critical system for reliability and life, since all other on board functions (mobility, navigation, command and data, communications, and the scientific payload instruments) require electrical power. The following are discussed: power generation, energy storage, power management and distribution, and thermal management.

  14. Integrating wind output with bulk power operations and wholesale electricity markets

    International Nuclear Information System (INIS)

    Hirst, E.

    2002-01-01

    Wind farms have three characteristics that complicate their widespread application as an electricity resource: limited control, unpredictability and variability. Therefore the integration of wind output into bulk power electric systems is qualitatively different from that of other types of generators. The electric system operator must move other generators up or down to offset the time-varying wind fluctuations. Such movements raise the costs of fuel and maintenance for these other generators. Not only is wind power different, it is new. The operators of bulk power systems have limited experience in integrating wind output into the larger system. As a consequence, market rules that treat wind fairly - neither subsidizing nor penalizing its operation - have not yet been developed. The lack of data and analytical methods encourages wind advocates and sceptics to rely primarily on their biases and beliefs in suggesting how wind should be integrated into bulk power systems. This project helps fill this data and analysis gap. Specifically, it develops and applies a quantitative method for the integration of a wind resource into a large electric system. The method permits wind to bid its output into a short-term forward market (specifically, an hour-ahead energy market) or to appear in real time and accept only intrahour and hourly imbalance payments for the unscheduled energy it delivers to the system. Finally, the method analyses the short-term (minute-to-minute) variation in wind output to determine the regulation requirement the wind resource imposes on the electrical system. (author)

  15. Electric power balance sheet 2013

    International Nuclear Information System (INIS)

    2014-01-01

    The mission of RTE, the French electricity Transportation grid, a public service assignment, is to balance the electricity supply and demand in real time. This report presents RTE's technical results for the year 2013: stabilisation of the electricity consumption in France, high level of hydropower generation, fast evolution of the European power network, electricity markets in a transition situation, adaptation of RTE's network to the evolutions of the energy system

  16. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  17. Electric power in Canada 1993

    International Nuclear Information System (INIS)

    1994-01-01

    The electric power industry in Canada in 1993 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Appended information is presented on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 23 figs., 95 tabs

  18. Electric power in Canada 1992

    International Nuclear Information System (INIS)

    1993-01-01

    The electric power industry in Canada in 1991 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Appended information is presented on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 26 figs., 90 tabs

  19. Nuclear power programmes and medium term projections in the OECD area

    International Nuclear Information System (INIS)

    Miida, J.; Haeussermann, W.; Mankin, S.

    1977-01-01

    The paper describes nuclear power growth forecasts up to 1985 on an individual country basis for the OECD area, based on present nuclear programmes. For the period between 1985 and the year 2000, no individual countries' estimates are given. The projections for this period are subdivided into three main areas: OECD Europe, North America and OECD Pacific Region. These projections are derived from the presently prevailing estimates concerning total energy growth, the increasing share of electricity requirements in total energy requirements and the growth of the nuclear share in electrical installed capacity. The basic assumptions are discussed and the combination of various possibilities results in upper and lower growth limits, which should include the most likely development. An attempt is also made to describe probable scenarios of nuclear reactor strategies, taking into account developments under way in the OECD area. Finally, the factors liable to influence nuclear power growth in a positive or negative way are briefly analysed

  20. The Relationship Between Electricity Price and Wind Power Generation in Danish Electricity Markets

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2010-01-01

    of competitive electricity markets in some ways, is chosen as the studied power system. The relationship between the electricity price (both the spot price and the regulation price) and the wind power generation in an electricity market is investigated in this paper. The spot price, the down regulation price...... and the up regulation price generally decreases when the wind power penetration in the power system increases. The statistical characteristics of the spot price for different wind power penetration are analyzed. The findings of this paper may be useful for wind power generation companies to make the optimal...... bidding strategy and may be also useful for the optimal operation of modern power systems with high wind power penetrations....

  1. Nuclear power's effects on electric rate making

    International Nuclear Information System (INIS)

    Smith, D.S.; Lancaster, A.A.

    1978-01-01

    Government and the electric utility industry are re-evaluating nuclear power's contribution to the total U.S. energy supplies. This article addresses how the recently increased nuclear plant construction and operation costs are translated into the prices that consumers pay for electricity. The electric rates that consumers pay must reflect the costs of producing electricity, as well as the costs of transmission, distribution, metering, and billing. The use of nuclear power for electric production is anticipated to grow rapidly so as to meet a larger portion of our country's electricity needs through the end of the century; so nuclear power costs are expected to be an even larger portion of the total electricity price. There are certain rate-making issues that are actively being discussed in public forums and before state and Federal regulatory bodies. These issues are not unique to nuclear power, but take on added significance when nuclear power is used by utilities to produce electricity because of the technology required and because of the type, timing, and magnitude of the costs involved. These are: (1) inclusion of construction work in progress in the rate base; (2) fuel adjustment clauses and treatment of nuclear fuel cycle costs; (3) treatment of certain taxes under the rate-making method called normalization or deferral accounting (sometimes referred to as ''phantom taxes''); and (4) rate treatment for particular nuclear expense items reflecting costs of delays, plant cancellations, and operational slowdowns

  2. The role of nuclear power in the global electric power system

    International Nuclear Information System (INIS)

    Sidorenko, V.A.; Chernilin, Yu.F.

    1992-01-01

    Basic conclusions and recommendations developed in the process of preparing and conducting the symposium discussed are presented. All methods of electric power production, their prospects and effects on man and environment were discussed during the symposium. This paper is devoted mainly to nuclear power engineering only, its prospects and possible role in general electric power generation

  3. Performance of a Fuel-Cell-Powered, Small Electric Airplane Assessed

    Science.gov (United States)

    Berton, Jeffrey J.

    2004-01-01

    Rapidly emerging fuel-cell-power technologies may be used to launch a new revolution of electric propulsion systems for light aircraft. Future small electric airplanes using fuel cell technologies hold the promise of high reliability, low maintenance, low noise, and - with the exception of water vapor - zero emissions. An analytical feasibility and performance assessment was conducted by NASA Glenn Research Center's Airbreathing Systems Analysis Office of a fuel-cell-powered, propeller-driven, small electric airplane based on a model of the MCR-01 two-place kitplane (Dyn'Aero, Darois, France). This assessment was conducted in parallel with an ongoing effort by the Advanced Technology Products Corporation and the Foundation for Advancing Science and Technology Education. Their project - partially funded by a NASA grant - is to design, build, and fly the first manned, continuously propelled, nongliding electric airplane. In our study, an analytical performance model of a proton exchange membrane (PEM) fuel cell propulsion system was developed and applied to a notional, two-place light airplane modeled after the MCR-01 kitplane. The PEM fuel cell stack was fed pure hydrogen fuel and humidified ambient air via a small automotive centrifugal supercharger. The fuel cell performance models were based on chemical reaction analyses calibrated with published data from the fledgling U.S. automotive fuel cell industry. Electric propeller motors, rated at two shaft power levels in separate assessments, were used to directly drive a two-bladed, variable-pitch propeller. Fuel sources considered were compressed hydrogen gas and cryogenic liquid hydrogen. Both of these fuel sources provided pure, contaminant-free hydrogen for the PEM cells.

  4. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  5. The electric power engineering handbook power systems

    CERN Document Server

    2012-01-01

    Power Systems, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) covers all aspects of power system protection, dynamics, stability, operation, and control. Under the editorial guidance of L.L. Grigsby, a respected and accomplished authority in power engineering, and section editors Andrew Hanson, Pritindra Chowdhuri, Gerry Sheble, and Mark Nelms, this carefully crafted reference includes substantial new and revised contributions from worldwide leaders in the field. This content provides convenient access to overviews and detailed information on a diverse arr

  6. Experiment with flexible electric power consumption. Appendix; Demonstrationsforsoeg med fleksibelt elforbrug. Bilag

    Energy Technology Data Exchange (ETDEWEB)

    Pedersen, Thomas Emil (Dong Energy A/S, Fredericia (Denmark))

    2009-09-15

    The emergence of interactive meters with communication module has made it possible that electricity consumption at different customer segments can be activated in a new way of benefit for the customer, the electricity company and the system operator. In this demonstration project the customer segment is larger commercial properties and public institutions. The appendix contains information about the pilot software, guide to install equipment to handle flexible power consumption, model for economic calculations, and the experiments at 3 different buildings are described. (ln)

  7. Proceedings of the Canadian Institute's BC power conference : maximizing opportunities in the evolving electricity sector

    International Nuclear Information System (INIS)

    2004-01-01

    This conference provided a forum for reviewing recent events and activities in British Columbia's electric power industry. Issues regarding energy supply, reliability, power generation, power distribution and power transmission were discussed along with the opportunities and challenges of developing renewable energy sources. Participants at the conference gained insight into strategies for determining the usefulness of an energy plan; assessing the prospects for new generation capacity; examining future whole sale markets; analyzing congestion problems; identifying import and export opportunities; planning for rate design and exploring the future supply on Vancouver Island. The possibilities for meeting the growing demand for electricity through an integrated electrical transmission system throughout the west coast, British Columbia, the Pacific Northwest and Alberta were examined along with financing structures and strategies of renewable energy projects. The role of regulators and their influence on electricity prices were also discussed. Resource planning guidelines were examined as well as other topics such as demand side management, energy conservation, the role of liquefied natural gas in power generation, and land use challenges for power generation. The conference featured 21 presentations, of which 7 have been catalogued separately for inclusion in this database. tabs, figs

  8. Economic market design and planning for electric power systems

    CERN Document Server

    Mili, Lamine

    2010-01-01

    Discover cutting-edge developments in electric power systems. Stemming from cutting-edge research and education activities in the field of electric power systems, this book brings together the knowledge of a panel of experts in economics, the social sciences, and electric power systems. In ten concise and comprehensible chapters, the book provides unprecedented coverage of the operation, control, planning, and design of electric power systems. It also discusses:. A framework for interdisciplinary research and education;. Modeling electricity markets;. Alternative economic criteria and proactiv.

  9. Conference on the flexibilization of the electric power system

    International Nuclear Information System (INIS)

    Laure Kaelble; Lantrain, Aurore; Pienisch, Kerstin; Behrens, Uwe; Renaud, Arnaud; Bena, Michel; Levacher, Ralf; Broves, Antoine de; Langrock, Thomas; Bureau, Cedric

    2015-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on the flexibilization of the electric power system in France and in Germany. In the framework of this French-German exchange of experience, about 100 participants discussed the different existing flexibility offers and shared information about the regulatory and economical context in both countries. This document brings together the available presentations (slides) made during this event: 1 - Flexibility in Germany: Status Quo and Perspectives (Laure Kaelble); 2 - Flexibility and French regulation (Aurore Lantrain); 3 - Virtual Power Plants: Contributions to flexibility? (Kerstin Pienisch); 4 - Wind power as player in the market for flexibility (Uwe Behrens); 5 - Energy storage potential in France - PEPS study for 2030 (Arnaud Renaud); 6 - More Flexibilities for TSOs to operate the electric System (Michel Bena); 7 - 'PolyenergyNet' project: how to flexibilize the low voltage grid by making it more autonomous (Ralf Levacher, in German); 8 - Promotion of industrial Demand Response through aggregation (Antoine de Broves); 9 - Using urban load: an economical model for companies? (Thomas Langrock); 10 - How to Involve All Consumers? ENGIe's Demand Side Management Offers (Cedric Bureau)

  10. 1-MWp electrical photovoltaic plant (EPHOP - project)

    International Nuclear Information System (INIS)

    Vitanov, P.; Toneva, A.; Petkanchin, L.; Ivancheva, J.; Neshev, S.

    2000-01-01

    The presented project concerns the realization of a grid connected 1-MW p pilot photovoltaic plant on the territory of Bulgaria.The purpose of the project is to demonstrate and prove solar energy advantages. A special attention will be paid to the possibility the generated electricity to join the national electric network. The site selection according to the meteorological conditions as well as general aspects of the project are discussed

  11. Power Electronics and Electric Machines | Transportation Research | NREL

    Science.gov (United States)

    Power Electronics and Electric Machines NREL's power electronics and electric machines research helping boost the performance of power electronics components and systems, while driving down size, weight technical barriers to EDV commercialization. EDVs rely heavily on power electronics to distribute the proper

  12. Electric cars as mobile power storage systems

    International Nuclear Information System (INIS)

    Herzog, B.

    2010-01-01

    This article discusses the use of electric cars as a means of optimising the use of renewable energy sources. Charging the cars' batteries during periods when cheap electricity prices prevail and then using excess capacity to supply the mains with electricity during periods of peak demand is discussed. The possible use of wind for power generation is discussed and a system proposed by a leading supplier of electrical apparatus and systems is examined. Two examples of electric cars and associated power chains are looked at and tests in everyday practice are described

  13. REACTIVE POWER DEVICES IN SYSTEMS OF ELECTRIC TRACTION

    Directory of Open Access Journals (Sweden)

    M. O. Kostin

    2010-04-01

    Full Text Available A comparative characteristic of different concepts and expressions for determination of reactive power in the circuits with non-sinusoidal electric values has been given. For the first Ukrainian electric locomotives of DE1 type with the system of DC electric traction, the values of reactive power after Budeany, Fryze, and also the differential, integral and generalized reactive powers have been determined. Some measures on reducing its consumption by the DC electric rolling stock have been suggested.

  14. Nuclear energy products except the electric power

    International Nuclear Information System (INIS)

    2004-01-01

    Technically the fission reactors, on service or under construction, can produce other products than the electric power. Meanwhile, these applications are known since the beginning of the reactors exploitation, they never have been developed industrially. This report examines the necessary technical characteristics for using the nuclear systems on non electric power applications with an economical efficiency. What are the markets for these products? What are the strategical challenges to favor the development of non electric power applications of the nuclear energy? (A.L.B.)

  15. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  16. Electric power generation the changing dimensions

    CERN Document Server

    Tagare, D M

    2011-01-01

    "This book offers an analytical overview of established electric generation processes, along with the present status & improvements for meeting the strains of reconstruction. These old methods are hydro-electric, thermal & nuclear power production. The book covers climatic constraints; their affects and how they are shaping thermal production. The book also covers the main renewable energy sources, wind and PV cells and the hybrids arising out of these. It covers distributed generation which already has a large presence is now being joined by wind & PV energies. It covers their accommodation in the present system. It introduces energy stores for electricity; when they burst upon the scene in full strength are expected to revolutionize electricity production. In all the subjects covered, there are references to power marketing & how it is shaping production. There will also be a reference chapter on how the power market works"--Provided by publisher.

  17. Optimal control applications in electric power systems

    CERN Document Server

    Christensen, G S; Soliman, S A

    1987-01-01

    Significant advances in the field of optimal control have been made over the past few decades. These advances have been well documented in numerous fine publications, and have motivated a number of innovations in electric power system engineering, but they have not yet been collected in book form. Our purpose in writing this book is to provide a description of some of the applications of optimal control techniques to practical power system problems. The book is designed for advanced undergraduate courses in electric power systems, as well as graduate courses in electrical engineering, applied mathematics, and industrial engineering. It is also intended as a self-study aid for practicing personnel involved in the planning and operation of electric power systems for utilities, manufacturers, and consulting and government regulatory agencies. The book consists of seven chapters. It begins with an introductory chapter that briefly reviews the history of optimal control and its power system applications and also p...

  18. Electrical power cable engineering

    CERN Document Server

    Thue, William A

    2011-01-01

    Fully updated, Electrical Power Cable Engineering, Third Edition again concentrates on the remarkably complex design, application, and preparation methods required to terminate and splice cables. This latest addition to the CRC Press Power Engineering series covers cutting-edge methods for design, manufacture, installation, operation, and maintenance of reliable power cable systems. It is based largely on feedback from experienced university lecturers who have taught courses on these very concepts.The book emphasizes methods to optimize vital design and installation of power cables used in the

  19. Electric power monthly, April 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-07

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  20. Electric power monthly, May 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-25

    The Electric Power Monthly (EPM) is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  1. Electric power: liberalization in half-measure

    International Nuclear Information System (INIS)

    Pradel, P.

    1996-01-01

    The European directive about the electric power liberalization concerns only big consumers. These manufacturers have privileged relations with E.D.F. for long years with a very attractive price for the kilowatt hour. The change should not be very important, only more transparency in accounts and change in tariffs of power transmission: for example, a small electric power producer will be authorized to contest the buying price that E.D.F. imposes to him to transport the energy he produces. (N.C.)

  2. Monitoring and analyzing features of electrical power quality system performance

    OpenAIRE

    Genci Sharko; Nike Shanku

    2010-01-01

    Power quality is a set of boundaries that allows electrical systems to function in their intended manner without significant loss of performance or life. The term is used to describe electric power that drives an electrical load and the load's ability to function properly with that electric power. Without the proper quality of the power, an electrical device may malfunction, fail prematurely or not operate at all. There are many reasons why the electric power can be of poor quality and many m...

  3. Studies in market-based electric power trade and regulation

    International Nuclear Information System (INIS)

    Hope, Einar

    2000-01-01

    This is a compilation of articles written by the author during the last fifteen years. Most of the articles are related to the reform of the Norwegian electric power market. This reform led to the Energy Act of 1990 and to the subsequent development of the power markets. Some of the sections are in Norwegian, some in English. The sections discuss (1) Markets for electricity trade in Norway, (2) Economic incentives and public firm behaviour, (3) Market alternatives to the present forms of occasional power trade, (4) Socio-economic considerations about electricity pricing, (5) Scenarios for market based power trade in Norway, (6) Markets for electricity: economic reform of the Norwegian electricity industry, (7) The Norwegian power market, (8) A common Nordic energy market?, (9) Organization of supply markets for natural gas in Europe, (10) The extent of the central grid, (11) Optimum regulation of grid monopolies in the power trade, (12) Power markets and competition policy, (13) Deregulation of the Norwegian power sector, (14) designing a market based system for the Icelandic electricity industry and (15) regulation regimes for the power sector

  4. Battery Electric Vehicles: characteristics and research projects

    NARCIS (Netherlands)

    Besselink, I.J.M.

    2010-01-01

    This presentation discusses briefly the history of the electric car and its main characteristics. Two projects introduced: the battery electric VW Lupo EL and URE05e electric Formula Student racecar. Presentation slides.

  5. Model Design on Emergency Power Supply of Electric Vehicle

    Directory of Open Access Journals (Sweden)

    Yuanliang Zhao

    2017-01-01

    Full Text Available According to the mobile storage characteristic of electric vehicles, an emergency power supply model about the electric vehicles is presented through analyzing its storage characteristic. The model can ensure important consumer loss minimization during power failure or emergency and can make electric vehicles cost minimization about running, scheduling, and vindicating. In view of the random dispersion feature in one area, an emergency power supply scheme using the electric vehicles is designed based on the K-means algorithm. The purpose is to improve the electric vehicles initiative gathering ability and reduce the electric vehicles gathering time. The study can reduce the number of other emergency power supply equipment and improve the urban electricity reliability.

  6. Propulsion element requirements using electrical power system unscheduled power

    Science.gov (United States)

    Zimmermann, Frank; Hodge, Kathy

    1989-01-01

    The suitability of using the electrical energy from the Space Station's Electrical Power System (EPS) during the periods of peak solar insolation which is currently not specifically allocated (unscheduled power) to produce propulsion propellants, gaseous hydrogen, and oxygen by electrolyzing water is investigated. Reboost propellant requirements are emphasized, but the results are more generally relevant because the balance of recurring propellant requirements are an order of magnitude smaller and the nonrecurring requirements are not significant on an average basis.

  7. Trends of the electricity output, power conversion efficiency, and the grid emission factor in North Korea

    Science.gov (United States)

    Yeo, M. J.; Kim, Y. P.

    2017-12-01

    Recently, concerns about the atmospheric environmental problems in North Korea (NK) have been growing. According to the World Health Organization (WHO) (2017), NK was the first ranked country in mortality rate attributed to household and ambient air pollution in 2012. Reliable energy-related data in NK were needed to understand the characteristics of air quality in NK. However, data from the North Korean government were limited. Nevertheless, we could find specific energy-related data produced by NK in the Project Design Documents (PDDs) of the Clean Development Mechanism (CDM) submitted to the United Nations Framework Convention on Climate Change (UNFCCC). There were the 6 registered CDM projects hosted by North Korea, developed as small hydropower plants. Several data of each power plant, such as the electricity output, connected to the Eastern Power Grid (EPG) or the Western Power Grid (WPG) in North Korea were provided in the CDM PDDs. We (1) figured out the trends of the electricity output, the `power conversion efficiency' which we defined the amount of generated electricity to the supplied input primary energy for power generation, and fuel mix as grid emission factor in NK as using the data produced by NK between 2005 and 2009, (2) discussed the operating status of the thermal power plants in NK, and (3) discussed the energy/environmental-related policies and the priority issues in NK in this study.

  8. Electric vehicle recycling 2020: Key component power electronics.

    Science.gov (United States)

    Bulach, Winfried; Schüler, Doris; Sellin, Guido; Elwert, Tobias; Schmid, Dieter; Goldmann, Daniel; Buchert, Matthias; Kammer, Ulrich

    2018-04-01

    Electromobility will play a key role in order to reach the specified ambitious greenhouse gas reduction targets in the German transport sector of 42% between 1990 and 2030. Subsequently, a significant rise in the sale of electric vehicles (EVs) is to be anticipated in future. The amount of EVs to be recycled will rise correspondingly after a delay. This includes the recyclable power electronics modules which are incorporated in every EV as an important component for energy management. Current recycling methods using car shredders and subsequent post shredder technologies show high recycling rates for the bulk metals but are still associated with high losses of precious and strategic metals such as gold, silver, platinum, palladium and tantalum. For this reason, the project 'Electric vehicle recycling 2020 - key component power electronics' developed an optimised recycling route for recycling power electronics modules from EVs which is also practicable in series production and can be implemented using standardised technology. This 'WEEE recycling route' involves the disassembly of the power electronics from the vehicle and a subsequent recycling in an electronic end-of-life equipment recycling plant. The developed recycling process is economical under the current conditions and raw material prices, even though it involves considerably higher costs than recycling using the car shredder. The life cycle assessment shows basically good results, both for the traditional car shredder route and the developed WEEE recycling route: the latter provides additional benefits from some higher recovery rates and corresponding credits.

  9. Power electronics and electric machinery challenges and opportunities in electric and hybrid vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Adams, D.J.; Hsu, J.S.; Young, R.W. [Oak Ridge National Lab., TN (United States); Peng, F.Z. [Univ. of Tennessee, Knoxville, TN (United States)

    1997-06-01

    The development of power electronics and electric machinery presents significant challenges to the advancement of electric and hybrid vehicles. Electronic components and systems development for vehicle applications have progressed from the replacement of mechanical systems to the availability of features that can only be realized through interacting electronic controls and devices. Near-term applications of power electronics in vehicles will enable integrated powertrain controls, integrated chassis system controls, and navigation and communications systems. Future applications of optimized electric machinery will enable highly efficient and lightweight systems. This paper will explore the areas where research and development is required to ensure the continued development of power electronics and electric machines to meet the rigorous demands of automotive applications. Additionally, recent advances in automotive related power electronics and electric machinery at Oak Ridge National Laboratory will be explained. 3 refs., 5 figs.

  10. Subsidy project in fiscal 1999 to accelerate forming an environment harmonizing energy community. Report on the survey on energy supply investigation project by using a wastes electric power generation system in wide city and village area in the Joso area; Joso chiho koiki shichosonken ni okeru haikibutsu hatsuden ni yoru energy kyokyu chosa jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on the feasibility of a project to be performed jointly by the Business Bureau of the Ibaraki Prefectural Government who takes charge of the wastes electric power generation project, and the Joso Area Wide City and Village Area Affair Association who performs refuse disposal project. The basic plan for the system may be summarized as follows: the gasification melting furnace shall have a capacity of 420 tons per day, discharge concentrations of dioxins shall be 0.01 ng-TEQ/m{sup 3} or less, the power generation system shall be the steam high-temperature high-pressure system, the power generation efficiency shall be 25%, and the electric power generation takes priority, with the steam after power generation use utilized for heat supply. The evaluation on the effect of introducing the project can be summarized as follows: in the social aspect, the execution of the joint project is safe and effective for the residents and society; it contributes to activation of the areas and assistance to the regional activities; correspondence will be possible to the tighter enforcement of the laws and regulations in the future; in the environmental aspect, discharge of carbon dioxide, sulfur oxides, and dioxins can be suppressed; and in the economic aspect, the ultimate disposal quantity in refuse treatment will be reduced greatly, serving for saving the treatment expense, and the refuse treatment cost may be reduced by assuring the earning from selling the electric power. (NEDO)

  11. Point Lepreau nuclear project unlocks power future of New Brunswick

    Energy Technology Data Exchange (ETDEWEB)

    Burgess, E J [New Brunswick Electric Power Commission, Fredericton (Canada)

    1976-08-01

    Projects under development will increase the generating capacity of New Brunswick Electric Power Commission from 1.47 to 3.14 GW. Of these projects, the most significant is the 0.63 GW Point Lepreau CANDU reactor. Progress in the construction of the power reactor is summarized. The concrete reactor building was slipformed in April 1976. A second nuclear unit at Point Lepreau is being considered. Information is also provided on the new oil-fired station at Coleson Cove, a new oil- or coal-fired unit at Dalhousie and further hydro units at Mactaquac. A 0.16 GW pumped storage hydro unit at Green River is being considered. Information on transmission (Including the HVDC system), substations, and connection with Hydro Quebec is included.

  12. Pre-feasibility study for an electric power plant based on rice straw. [Mali

    Energy Technology Data Exchange (ETDEWEB)

    Fock, F. [Ea Energy Analysis, Copenhagen (Denmark); Nygaard, I. [Technical Univ. of Denmark. DTU Management Engineering, UNEP Risoe Centre on Energy, Climate and Sustainable Development, Roskilde (Denmark); Maiga, A.; Kone, B.; Kamissoko, F.; Coulibaly, N.; Ouattara, O.

    2012-11-15

    The main objective is to make a first evaluation regarding if it's technically possible, economically viable, sustainable and recommendable to build a rice straw/hulls fired power plant in Niono in Mali. Based on the available resource of rice straw and the possibilities for connecting to the grid it has been chosen to analyse a 5 MW power plant in the project. For technical reasons the rice straw should be the main fuel, but rice hulls can be used for co-firing. Up to around 20% of the fuel in the plant can be rice hulls instead of rice straw. A number of different biomass power production technologies have been evaluated in the project. This includes: 1) Grate fired boiler. 2) Bubbling fluidised bed. 3) Circulating fluidised bed. 4) Dust fired boiler. 5) Gasification. 6) Stirling engine. 7) Organic Rankine Cycle. Grate firing is the most relevant technology in this case, due to the fuel, the size of the power plant, the demand for electricity only and not heat, the demand for a robust and well proven technology. For a grate fired plant a calculation of the thermodynamic process of the power plant has been carried out in order to determine the electrical efficiency of the plant. The case consists of a 5 MW grate fired power plant with steam turbines and air cooled condenser resulting in an efficiency of 24.6% at full load (20% as yearly average). Investment costs and costs for O and M have been assumed based on experience from Danish power plants but adjusted for local conditions in Mali. The costs for collecting and transporting the rice straw and for the ash disposal have been specifically estimated in this project. The average cost of capital has been estimated based on assumptions on equity, international loans and local loans/bank finance. Based on the investment, the cost of O and M, fuel, ash disposal and the financial assumptions, a cash flow analysis is made in order to calculate the power price resulting in a Net Present Value (NPV) of the

  13. Validation of a methodology for the study of generation cost of electric power for nuclear power plants

    International Nuclear Information System (INIS)

    Ortega C, R.F.; Martin del Campo M, C.

    2004-01-01

    It was developed a model for the calculation of costs of electric generation of nuclear plants. The developed pattern was validated with the one used by the United States Council for Energy Awareness (USCEA) and the Electric Power Research Institute (EPRI), in studies of comparison of alternatives for electric generation of nuclear plants and fossil plants with base of gas and of coal in the United States described in the guides calls Technical Assessment Guides of EPRI. They are mentioned in qualitative form some changes in the technology of nucleo electric generation that could be included in the annual publication of Costs and Parameters of Reference for the Formulation of Projects of Investment in the Electric Sector of the Federal Commission of Electricity. These changes are in relation to the advances in the technology, in the licensing, in the construction and in the operation of the reactors called advanced as the A BWR built recently in Japan. (Author)

  14. Energy, electricity and nuclear power estimates for the period up to 2030. July 2005 ed

    International Nuclear Information System (INIS)

    2005-01-01

    Reference Data Series No. 1 is an annual publication - currently in its twenty-fifth edition - containing estimates of energy, electricity and nuclear power trends up to the year 2030. Nuclear data presented in Table 1 are based on actual statistical data collected by the IAEA's Power Reactor Information System (PRIS). Energy and electricity data for 2004, however, are estimated, since the latest available information from the Department of Economic and Social Affairs of the United Nations is for 2002. Population data originate from the 'World Population Prospects' (2003 Revision), published by the Population Division of the UN Department of Economic and Social Affairs, and the 2004 values are estimates. The future growth of energy, electricity and nuclear power up to the year 2030 is presented as low and high estimates in order to encompass the uncertainties associated with the future. These estimates should be viewed as very general growth trends whose validity must constantly be subjected to critical review. The energy forecasts carried out in increasing numbers over the last years by international, national and private organizations are based on a multiplicity of different assumptions and different aggregating procedures, which make their comparison and synthesis very difficult. The basic differences refer to such fundamental input data as: - World and regional scenarios of economic development; - Correlation of economic growth and energy consumption; - Assumptions on physical, economic and political constraints applying to energy production and consumption; - Future prices of different energy sources. The projections presented in this booklet are based on a compromise among: - National projections supplied by each country for a recent OECD/NEA study; - Indicators of development published by the World Bank in its World Development Indicators; - Estimates of energy, electricity and nuclear power growth continuously carried out by the IAEA in the wake of recent

  15. Energy, electricity and nuclear power estimates for the period up to 2020. July 2001 ed

    International Nuclear Information System (INIS)

    2001-01-01

    Reference Data Series No. 1 is an annual publication, currently in its twenty-first edition, containing estimates of energy, electricity and nuclear power trends up to the year 2020. Nuclear data presented are based on actual statistical data collected by the IAEA Power Reactor Information System (PRIS). Energy and electricity data for 2000, however, are estimated, since the latest available information from the Department of Economic and Social Affairs of the United Nations is for 1998. Population data originate from the 'World Population Prospects' (1999 Revision), published by the Population Division of the UN Department of Economic and Social Affairs, and the 2000 values are estimates. The future growth of energy, electricity and nuclear power up to the year 2020 is presented as low and high estimates in order to encompass the uncertainties associated with the future. These estimates should be viewed as very general growth trends whose validity must constantly be subjected to critical review. The energy forecasts carried out in increasing numbers over the last years by international, national and private organizations are based on a multiplicity of different assumptions and different aggregating procedures, which make their comparison and synthesis very difficult. The basic differences refer to such fundamental input data as: World and regional scenarios of economic development; Correlation of economic growth and energy consumption; Assumptions on physical, economic and political constraints applying to energy production and consumption; Future prices of different energy sources. The projections presented in this booklet are based on a compromise among: National projections supplied by each country for a recent OECD NEA study; Indicators of development published by the World Bank in its World Development Indicators; Estimates of energy, electricity and nuclear power growth continuously carried out by the IAEA in the wake of recent global and regional

  16. Study about the technical and economic viability of use of hybrid systems for the electric power generation

    International Nuclear Information System (INIS)

    Uribe C, Juan Pablo; Pinilla, Alvaro

    1997-01-01

    The work is directed to the study of the application of eolic- solar systems in Colombia. During the year of 1992 and the first trimester of 1993, the country suffered the worst crisis of electric power supply in the last thirty years, due to the criticize level of the reservoirs and also to the inefficiency of the planning and execution of necessary projects to cover the energy demand with the enough dependability in the system. This situation made see the present inefficiency and inform the Government of the necessity of reforming the traditional system of generation and distribution of energy of that moment. The result was the development of the laws 142 and 143 of 1994 in the one which it accent an open door for the participation of the private investors, so that these they can be present in new generation projects and commercialization of the electric power. One could not know the reasons for those which, having the guarantees given in these laws, it has not decided to carry out projects of energy generation, based on the hybrid systems, but it could speculate in the lack of the investors capital, and unfortunately for the country the fact that they are cost projects and smaller capacity comparing it with a hydroelectric one or with a thermoelectric one it doesn't link to the political class, since of these projects it could not take out financial resources for illegal means. If you wants to know the variables that affect the realization of a project based on the renewable energy sources, one could have a countless list. It is as well as information is required about the current net of transmission and electric power generation, about the legislation it has more than enough production and private commercialization of electricity, about the systems of electricity generation by means of renewable sources that at the moment are in the market, to outline a model in which determines by means of financial parameters the viability of an investment of this type

  17. Perspectives of the electric power industry amid the transforming global power generation markets

    Science.gov (United States)

    Makarov, A. A.; Mitrova, T. A.; Veselov, F. V.; Galkina, A. A.; Kulagin, V. A.

    2017-10-01

    A scenario-based prognosis of the evolution of global power generation markets until 2040, which was developed using the Scaner model-and-information complex, was given. The perspective development of fuel markets, vital for the power generation industry, was considered, and an attempt to predict the demand, production, and prices of oil, gas, coal, and noncarbon resources across various regions of the world was made. The anticipated decline in the growth of the global demand for fossil fuels and their sufficiency with relatively low extraction expenses will maintain the fuel prices (the data hereinafter are given as per 2014 prices) lower than their peak values in 2012. The outrunning growth of demand for electric power is shown in comparison with other power resources by regions and large countries in the world. The conditions of interfuel competition in the electric power industry considering the changes in anticipated fuel prices and cost indicators for various power generation technologies were studied. For this purpose, the ratios of discounted costs of electric power production by new gas and coal TPPs and wind and solar power plants were estimated. It was proven that accounting the system effects (operation modes, necessary duplicating and reserving the power of electric power plants using renewable energy sources) notably reduces the competitiveness of the renewable power industry and is not always compensated by the expected lowering of its capital intensity and growth of fuel for TPPs. However, even with a moderate (in relation to other prognoses) growth of the role of power plants using renewable energy sources, they will triple electric power production. In this context, thermal power plants will preserve their leadership covering up to 60% of the global electric power production, approximately half using gas.

  18. The NERAM project: A model for Electric Power Enterprise in Isolated Communities in the Amazon; O Projeto NERAM - Modelo de Negocio de Energia Eletrica em Comunidades Isoladas na Amazonia

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, Monica; Xavier, Diogo; Souza, Rubem; Seye, Omar; Santos, Eyde dos; Freitas, Katriana; Moraes, Marcia [Universidade Federal do Amazonas (CDEAM/UFAM), Manaus, AM (Brazil). Centro de Desenvolvimento Energetico Amazonico], Email: monica.mzman@gmail.com

    2006-07-01

    This work presents an overview of the ongoing NERAM - A Model for Electric Power Enterprise in Isolated Communities in the Amazon, a project from CDEAM (Center for Amazonian Energetic Development), financed by CNPq (National Counsel of Technological and Scientific Development). This project aims at establishing a model for rural electrification associated with income generation and based on the sustainable use of local resources. This paper presents the most relevant aspects of the context as well as a general description of the project. The current rural power supply, the socio-economic condition of isolated communities, the income generation from acai pulp and the system generation, the biomass characterization are topics addressed herewith. This text aims at a global outlook and to provide basic understanding of the project, since specific papers will address these issues separately and in depth. (author)

  19. Public and private attitudes towards 'green' electricity: the case of Swedish wind power

    International Nuclear Information System (INIS)

    Ek, Kristina

    2005-01-01

    There exists a political goal in Sweden and elsewhere to increase the use of renewable energy and wind power seems to be a favourable choice from an environmental perspective. However, although the public generally expresses a positive attitude towards wind power, the experience often shows that specific wind power projects face resistance from the local population. This paper analyses the attitudes towards wind power among the electricity consumers as well as the foundations of these attitudes. Results are based on a postal survey that was sent out to 1000 Swedish house owners. According to the results, the public is generally positive towards wind power. The probability of finding an average individual in support of wind power decreases with age and income. People with an interest in environmental issues are, however, more likely to be positive towards wind power than the average respondent and the results do not support the NIMBY-hypothesis. In addition, people that are more inclined to express public preferences are also more likely to be positive towards wind electricity than people who are less inclined to do so. These results imply, for instance, that the potential of markets for 'green' electricity may be limited, other support schemes is thus required if the politically stated goal to increase wind power capacity is to be fulfilled

  20. Topical problems of the German electric power industry

    Energy Technology Data Exchange (ETDEWEB)

    Boeck, H [Stadtwerke Hannover A.G. (Germany, F.R.); Worm, N [Hannover-Braunschweigische Stromversorgungs-A.G., Hannover (Germany, F.R.); Brohmeyer, M [Schleswig-Holsteinische Stromversorgungs A.G., Rendsburg (Germany, F.R.). Abt. Anwendungstechnik und Beratung; Deuster, G [Energieversorgung Oberhausen A.G. (Germany, F.R.); Heitzer, H; Holzer, J [Bayernwerk A.G., Muenchen (Germany, F.R.); Deparade, K [Verband der Energie-Abnehmer e.V., Hannover (Germany, F.R.); Marnet, C [Stadtwerke Duesseldorf A.G. (Germany, F.R.); Oberlack, H W [Hamburgische Electricitaets-Werke A.G. (Germany, F.R.); Segatz, U [Preussische Elektrizitaets-A.G. (Preussenelektra), Hannover (Germany, F.R.)

    1978-06-01

    On the occasion of the general meeting of the VDE high-ranking personalities of the German Power Supply Industry were interviewed on current affairs. The following subjects were discussed: (1) problems involved in energy policy; (2) energy problems due to newly formed regions; (3) utilization of electric power in agriculture; (4) development prospects of district heating; (5) problems of power generation far from coal districts; (6) rationalization in the commercial sector; (7) opportunities and limits of industrial combined heat and power generation; (8) environmental protection and electric power supply; (9) possible utilization of imported coal; and (10). assuring the primary energy basis for electric power supply.

  1. Chaos in power: Pakistan's electricity crisis

    International Nuclear Information System (INIS)

    Kessides, Ioannis N.

    2013-01-01

    Pakistan is facing a severe electricity crisis due to a persistent and widening gap between demand and available system generating capacity. The worsening of power shortages has become a major political issue, reflecting the hardships for individuals and businesses. It threatens to undermine the credibility and legitimacy of government and to further stress the social fabric of the country. The power crisis did not emerge suddenly. It is the direct result of imprudent and reckless energy policies over the last three decades. These policies have impeded the development of cheap and abundant domestic energy sources. They have also resulted in very inefficient fuel-mix choices, compromising energy and economic security. Pakistan's energy bankruptcy is ultimately due to massive institutional and governance failure. This paper analyzes the problems confronting Pakistan's electricity sector and identifies the key elements of a potential policy response to address the country's severe power crisis. - Highlights: ► We analyze the structure, conduct, and performance of Pakistan's electricity sector. ► The causes and economic impacts of Pakistan's electricity shortages are analyzed. ► We identify the potential policy response to the power crisis

  2. Electric Vehicle Integration into Modern Power Networks

    DEFF Research Database (Denmark)

    software tools to assess the impacts resulting from the electric vehicles deployment on the steady state and dynamic operation of electricity grids, identifies strategies to mitigate them and the possibility to support simultaneously large-scale integration of renewable energy sources. New business models......Electric Vehicle Integration into Modern Power Networks provides coverage of the challenges and opportunities posed by the progressive integration of electric drive vehicles. Starting with a thorough overview of the current electric vehicle and battery state-of-the-art, this work describes dynamic...... and control management architectures, as well as the communication infrastructure required to integrate electric vehicles as active demand are presented. Finally, regulatory issues of integrating electric vehicles into modern power systems are addressed. Inspired by two courses held under the EES...

  3. Electric Vehicle Integration into Modern Power Networks

    DEFF Research Database (Denmark)

    Electric Vehicle Integration into Modern Power Networks provides coverage of the challenges and opportunities posed by the progressive integration of electric drive vehicles. Starting with a thorough overview of the current electric vehicle and battery state-of-the-art, this work describes dynamic...... software tools to assess the impacts resulting from the electric vehicles deployment on the steady state and dynamic operation of electricity grids, identifies strategies to mitigate them and the possibility to support simultaneously large-scale integration of renewable energy sources. New business models...... and control management architectures, as well as the communication infrastructure required to integrate electric vehicles as active demand are presented. Finally, regulatory issues of integrating electric vehicles into modern power systems are addressed. Inspired by two courses held under the EES...

  4. Nuclear power within liberalised electricity markets

    International Nuclear Information System (INIS)

    Kidd, Stephen W.

    2002-01-01

    Competition between various methods of generating electricity in liberalised markets means that all power plants must be cost-effective. The price of electricity from nuclear power includes all waste disposal and decommissioning costs, unlike other electricity generating technologies. Most existing nuclear power plants are likely to prosper under electricity liberalization. Many will receive operating life extensions and be able to compete in the electricity market for many years to come. Investment costs are particularly heavy for nuclear plants. Capital expenditure appraisal methodologies mean that such plants suffer financial disadvantages in times of high interest rates. Low and stable fuel costs are the prime advantage of nuclear plants against other sources of generating electricity. There will be significant demand for new generating capacity, both incremental and replacement, in the next 20 years. Under present conditions, where there is access to a stable and cheap supply of piped gas, nuclear and coal plants find it difficult to compete against gas-fired plants. The nuclear industry is addressing the need for new reactor designs, offering significant capital and operating cost reductions from the previous generation of reactors. This development and the need for carbon abatement on a worldwide basis offers nuclear plants a further economic advantage against alternative technologies. (author)

  5. Perceptions of the Quebec population regarding the development of the electric power industry in Quebec

    International Nuclear Information System (INIS)

    Lefebvre, M.; Deland, I.

    2000-04-01

    In March 2000 the Association de l'industrie electrique du Quebec hired the strategic marketing firm of Leger and Leger to conduct a survey of the Quebec population with the following three objectives in mind: (1) to evaluate the general opinion of the Quebec population regarding the development of new hydroelectric projects, (2) to determine the public opinion regarding the exportation of electricity, and (3) to evaluate the public opinion regarding certain hydroelectric projects that were already underway. 1000 adults were polled. It was determined that a large majority (84.2 per cent) of Quebecers are in favour of new hydroelectric development in the province as long as certain conditions are respected, such as maintaining jobs and not incurring an increase in the price of electricity. It was also determined that Quebecers are under the impression that the province exports much more electricity than it actually does. 66 per cent of the population believe that the province is exporting more than 20 per cent of its electric power production outside of the province. In reality, the province exports on average 10 per cent of its production. 71.5 per cent of Quebecers agree to new projects of exportation as long as the projects do not decrease the capacity for the province to fulfill its own power needs. In terms of environmental perceptions, hydroelectric power is considered to be the second least polluting source of energy both from an air pollution and visual pollution point of view. 72.6 per cent of the people said that hydro produces less greenhouse gases than electricity produced by natural gas or coal. Also 83.4 per cent recognized that hydro is a renewable resource. In general, the people surveyed were also in agreement with the development of new transmission lines. 86.8 per cent agreed with the construction of a transmission line between the Laurentians and the Outaouais. The polls are accurate to 3.1 per cent precision 19 times out of 20. tabs., figs

  6. ELMO model predicts the price of electric power

    International Nuclear Information System (INIS)

    Antila, H.

    2001-01-01

    Electrowatt-Ekono has developed a new model, by which it is possible to make long-term prognoses on the development of electricity prices in the Nordic Countries. The ELMO model can be used as an analysis service of the electricity markets and estimation of the profitability of long-term power distribution contracts with different scenarios. It can also be applied for calculation of technical and economical fundamentals for new power plants, and for estimation of the effects of different taxation models on the emissions of power generation. The model describes the whole power generation system, the power and heat consumption and transmission. The Finnish power generation system is based on the Electrowatt-Ekono's boiler database by combining different data elements. Calculation is based on the assumption that the Nordic power generation system is used optimally, and that the production costs are minimised. In practise the effectively operated electricity markets ensure the optimal use of the production system. The market area to be described consists of Finland and Sweden. The spot prices have long been the same. Norway has been treated as a separate market area. The most potential power generation system, the power consumption and the power transmission system are presumed for the target year during a normal rainfall situation. The basic scenario is calculated on the basis of the preconditional data. The calculation is carried out on hourly basis, which enables the estimation of the price variation of electric power between different times during the day and seasons. The system optimises the power generation on the basis of electricity and heat consumption curves and fuel prices. The result is an hourly limit price for electric power. Estimates are presented as standard form reports. Prices are presented as average annuals, in the seasonal base, and in hourly or daily basis for different seasons

  7. Concerning the debate on electric-powered-vehicle emissions

    International Nuclear Information System (INIS)

    Sporckmann, B.

    1994-01-01

    The fact that electric-powered vehicles do not emit pollutants locally is obvious and must be considered as the main motive for their use. The global air pollution situation can only be of secondary importance because within the foreseeable future emissions linked to the use of electric-powered vehicles will remain within the variation width of power generation emissions that is not to be influenced. All the same, it is indispensable to consider the global situation. The author compares electric-powered vehicles with conventional ones by referring to the power generation of all federal German states. (orig.) [de

  8. The place of the large electric power consumers in the electric power liberalised market

    International Nuclear Information System (INIS)

    Pavlov, Risto; Chogelja, Goran

    2001-01-01

    In this paper the basic rules of the EC Directive 96/92 of the EU are given. The implementation of the Directive into the Macedonian legislation is analysed. Also, the Directive's influence on the both large electric power consumers and the Macedonian Power System itself is presented

  9. TOPEX electrical power system

    Science.gov (United States)

    Chetty, P. R. K.; Roufberg, Lew; Costogue, Ernest

    1991-01-01

    The TOPEX mission requirements which impact the power requirements and analyses are presented. A description of the electrical power system (EPS), including energy management and battery charging methods that were conceived and developed to meet the identified satellite requirements, is included. Analysis of the TOPEX EPS confirms that all of its electrical performance and reliability requirements have been met. The TOPEX EPS employs the flight-proven modular power system (MPS) which is part of the Multimission Modular Spacecraft and provides high reliability, abbreviated development effort and schedule, and low cost. An energy balance equation, unique to TOPEX, has been derived to confirm that the batteries will be completely recharged following each eclipse, under worst-case conditions. TOPEX uses three NASA Standard 50AH Ni-Cd batteries, each with 22 cells in series. The MPS contains battery charge control and protection based on measurements of battery currents, voltages, temperatures, and computed depth-of-discharge. In case of impending battery depletion, the MPS automatically implements load shedding.

  10. Electric Power Supply Chain Management Addressing Climate Change

    DEFF Research Database (Denmark)

    Wang, Xiao-Hui; Cong, Ronggang

    2012-01-01

    Supply chain management played a critical role in the electric power industrial chain optimization. The purpose of this paper was to review a sample of the literature relating to supply chain management and its possible applications in electricity power system, especially in the context of climate...... change. The study compared the difference between electric power supply chain management and traditional supply chain management. Furthermore, some possible research topics are addressed. The aim of this paper was to promote the application of supply chain management in the China electricity sector...

  11. Hedging electricity price volatility using nuclear power

    International Nuclear Information System (INIS)

    Mari, Carlo

    2014-01-01

    Highlights: • Nuclear power is an important asset to reduce the volatility of electricity prices. • Unpredictability of fossil fuels and carbon prices makes power prices very volatile. • The dynamics of fossil fuels and carbon prices is described by Brownian motions. • LCOE values, volatilities and correlations are obtained via Monte Carlo simulations. • Optimal portfolios of generating technologies are get using a mean–variance approach. - Abstract: The analysis presented in this paper aims to put in some evidence the role of nuclear power as hedging asset against the volatility of electricity prices. The unpredictability of natural gas and coal market prices as well as the uncertainty in environmental policies may affect power generating costs, thus enhancing volatility in electricity market prices. The nuclear option, allowing to generate electricity without carbon emissions, offers the possibility to reduce the volatility of electricity prices through optimal diversification of power generating technologies. This paper provides a methodological scheme to plan well diversified “portfolios” of generating capacity that minimize the electricity price risk induced by random movements of fossil fuels market prices and by unpredictable fluctuations of carbon credits prices. The analysis is developed within a stochastic environment in which the dynamics of fuel prices as well as the dynamics of carbon credits prices is assumed to evolve in time according to well defined Brownian processes. Starting from market data and using Monte Carlo techniques to simulate generating cost values, the hedging argument is developed by selecting optimal portfolio of power generating technologies using a mean–variance approach

  12. Design of reactive power procurement in deregulated electricity market

    African Journals Online (AJOL)

    Reactive power management is different in the deregulated electricity market of various countries. In this paper, a novel reactive power procurement model is proposed, which ensure secure and reliable operation of deregulated electricity market. Various issues of reactive power management in the deregulated electricity ...

  13. Electric power monthly, September 1990. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-17

    The purpose of this report is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues. The power plants considered include coal, petroleum, natural gas, hydroelectric, and nuclear power plants. Data are presented for power generation, fuel consumption, fuel receipts and cost, sales of electricity, and unusual occurrences at power plants. Data are compared at the national, Census division, and state levels. 4 figs., 52 tabs. (CK)

  14. Energy, electricity and nuclear power estimates for the period up to 2020. July 2002 ed

    International Nuclear Information System (INIS)

    2002-01-01

    Reference Data Series No. 1 is an annual publication - currently in its twenty-second edition - containing estimates of energy, electricity and nuclear power trends up to the year 2020. Nuclear data presented in Table 1 are based on actual statistical data collected by the IAEA's Power Reactor Information System (PRIS). Energy and electricity data for 2001, however, are estimated, since the latest available information from the Department of Economic and Social Affairs of the United Nations is for 1999. Population data originate from the 'World Population Prospects' (2001 Revision), published by the Population Division of the UN Department of Economic and Social Affairs, and the 2001 values are estimates. The future growth of energy, electricity and nuclear power up to the year 2020 is presented as low and high estimates in order to encompass the uncertainties associated with the future. These estimates should be viewed as very general growth trends whose validity must constantly be subjected to critical review. The nuclear generating capacity estimates presented in Table 3 are derived from a country by country bottom-up approach. They are established by a group of experts participating each year in the IAEA's consultancy on Nuclear Capacity Projections and based upon a review of nuclear power projects and programmes in Member States. The total energy consumption has been calculated by summing the primary energy consumption and the net secondary energy import. The values shown in Table 9 refer to primary energy consumed for the generation of electricity. Owing to differences in conversion efficiencies, the percentage values are different from the shares of electricity generation presented in Tables 1 and 5

  15. Battery-Powered Electric and Hybrid Electric Vehicle Projects to Reduce Greenhouse Gas Emissions: A Resource for Project Development

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2002-07-31

    as requiring specific technology improvements or an increase in fuel efficiency. Site-specific project activities can also be undertaken to help decrease GHG emissions, although the use of such measures is less common. Sample activities include switching to less GHG-intensive vehicle options, such as electric vehicles (EVs) or hybrid electric vehicles (HEVs). As emissions from transportation activities continue to rise, it will be necessary to promote both types of abatement activities in order to reverse the current emissions path. This Resource Guide focuses on site- and project-specific transportation activities. .

  16. Distributed control of deregulated electrical power networks

    NARCIS (Netherlands)

    Hermans, R.M.

    2012-01-01

    A prerequisite for reliable operation of electrical power networks is that supply and demand are balanced at all time, as efficient ways for storing large amounts of electrical energy are scarce. Balancing is challenging, however, due to the power system's dimensions and complexity, the low

  17. DISTRIBUTED ELECTRICAL POWER PRODUCTION SYSTEM AND METHOD OF CONTROL THEREOF

    DEFF Research Database (Denmark)

    2010-01-01

    The present invention relates to a distributed electrical power production system wherein two or more electrical power units comprise respective sets of power supply attributes. Each set of power supply attributes is associated with a dynamic operating state of a particular electrical power unit....

  18. The long term plan for the integration of nuclear power plants into the Turkish Electrical Power System

    International Nuclear Information System (INIS)

    Kutukcuoglu, A.

    1974-03-01

    The report covers in detail the study of the expansion of the Turkish Electric Power System for the period 1980-1987. Load forecast is done by sectors and regions and inter-regions power balances gave the basis for the high voltage network configurations. Expansion alternatives are defined giving priority to hydroelectric projects, to local resources and nuclear power plants concurrently with conventional plants (lignite and oil). Several reactor strategies are analysed with LWR, HWR, FBR and HTGR power plants. Present worth value method is used for comparison of alternatives and sensitivity analysis is done for those ranked in the first places. Load flow, transient stability and frequency deviation studies of the power system are studied carefully by means of A.C. calculator and digital computer codes in order to see the influence of the introduction of large-sized power plants (600-750MW(e)) and their location in the power system. A 600MW(e) nuclear plant in 1983 and a second one of 750MW(e) in 1987 should, it is found, be commissioned into the system. The economic optimization was done with two computer programmes developed by KFA (Juelich): IACO for fuelling nuclear plant and RESTRAPO for power system with high hydroelectric component. The report is bound in three volumes: Volume I: Summary and Conclusions; Volume II: System Planning; Volume III: Electrical Survey

  19. Sectoral panorama: the electric power sector in Europe

    International Nuclear Information System (INIS)

    Mons, L.

    2003-10-01

    This study takes stock on the main european markets to help the electric power companies in their decisions and investments. The first part presents the electric power sector structure in Europe. The second part is devoted to the market evolution for the different european markets (german, french, british, italian and spanish) with an analysis of the retail prices, the competition and the evolution perspectives. The third part presents the highlights in the electric power sector between 2001 and the middle of 2003. The enterprises management and strategies are presented in the fourth part. In the last part the document analyzes the financial performances of the sector and the electric power companies. (A.L.B.)

  20. Electric vehicles in Danish power system with large penetration of wind power

    DEFF Research Database (Denmark)

    Yang, Lihui; Xu, Zhao; Østergaard, Jacob

    2011-01-01

    Electric vehicles (EVs) provide a unique opportunity for reducing the CO2 emissions from the transport sector. At the same time, EVs have the potential to play an important role in the economical and reliable operation of an electricity system with high penetration of renewable energy. An analysi......). The managing structure of V2G adopting virtual power plant (VPP) technology is proposed. © 2011 State Grid Electric Power Research Institute Press....... is made of the potential for using EVs in Denmark, and the benefits of the electric power system with high wind power generation by intelligent charging and discharging of EVs are enumerated. Based on the analysis, important technological gaps are identified, and the corresponding research and development...... initiatives of the recently established EDISON program are described. Moreover, the latest development of the EDISON program is treated, that is, EDISON as a research consortium to design a new model for the Danish power system with high penetration of wind power and EVs with vehicle to grid (V2G...

  1. Financial analysis of wind power projects

    International Nuclear Information System (INIS)

    Juanico, Luis E.; Bergallo, Juan E.

    1999-01-01

    In this work a financial assessment of the economic competitiveness of wind power projects in Argentina compared with other no CO 2 emission sources, such as nuclear, was developed. Argentina has a market driven electrical grid system, and no greenhouse gas emissions penalty taxes, together with a very low natural gas cost and a sustained nuclear development program. For the financial analysis an average wind velocity source of 8 m/s, on several wind farms (from 2 machines to 60) built with new technology wind generators (750 kilowatts power, 900 dollar/kilowatt cost) operating over 20 years, was considered. The leveled cost obtained is decreasing while the number of machines is increasing, from 0,130 dollar/kilowatt-hour to 0,090 dollar/kilowatts-hour. This poor performance can be partially explained considering the higher interest rates in the argentine financial market (15%) than the ones in developed countries

  2. Evaluation of sub-soil geo-electric properties in a proposed power sub-station site at Ebubu, Rivers State, Nigeria

    OpenAIRE

    T.K.S. Abam; S.A. Ngah

    2014-01-01

    Electrical resistivity survey was carried out in a site proposed for the construction and installation of a Power sub-station. The project will involve subsurface installation of cables and other objects that easily conduct electricity. Extant laws including EIA also require knowledge of subsurface distribution of resistivity in construction projects that would involve burial of steel pipes and cables. The imperative of this is emphasized by the location of the project in an area of shallow g...

  3. Electric power industry restructuring and ROE: The case of Korea Electric Power Corporation

    International Nuclear Information System (INIS)

    Won, Gu-Hwan

    2007-01-01

    Korea's electric power industry was previously run by Korea Electric Power Corporation (KEPCO) in a natural monopoly-type structure. As economy of scale was waning in influence and management effectiveness began to increase in importance, KEPCO was divided into six subsidiaries and faced competition beginning in April 2001. This study evaluates the restructuring process for Korea's power industry and analyzes the financial outcomes based on return on equity (ROE). The results show that the ROE ratio increased. In the analysis period (1993-2004), the financial ratio showed a better performance than that before restructuring. However, productivity ratios such as productivity of capital (or gross value added to total assets) and gross value added to property, plant, and equipment decreased compared to the situation before restructuring. It is believed that the results were due to the increased financial leverage of KEPCO. For this reason, KEPCO should make further efforts to manage its debt in a systematic way

  4. Report on assessment of electrical equipment aging for nuclear power plant (AEA), FY2011

    International Nuclear Information System (INIS)

    Minakawa, T.

    2012-11-01

    Electrical components with safety function used in nuclear power plants, such as cables, medium voltage motors, low voltage motors, electrical penetration of reactor containment vessel, motor operated valve, pressure transmitter, temperature detector, etc, are required to be operational under the environment of design basis event (DBE) to shut down a reactor safely and to prevent radioactive materials from being leaked to outside. Polymer materials used as parts of these equipments are gradually degraded by thermal and radiation environment in the normal operation. In addition, the degradation is thought to progress rapidly when they are exposed to the DBE environment and a decrease in performance of the equipment may be caused. From these reason, electrical components with safety function are tested for long-term integrity in accordance with IEEE standard. However, conventional method of accelerated aging which assumes thermal and radiation aging during normal operation is said to have uncertainty in simulating the degradation given in actual operating environment. To address this issue, the project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) was carried out and 'Guide for Cable Environmental Qualification Test for Nuclear Power Plant' was developed. The need for developing an aging evaluation method for other electrical and I and C components was pointed out in the 'Strategy maps 2007', prepared by the cooperation among government, industry and academia. Under the circumstance, the project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008. In this study, parts of electrical and I and C component with safety function used in nuclear power plant whose aging needs to be considered are employed as specimens, and their aging characteristics under the thermal environment and the combined radiation and thermal environment are obtained (herein after referred to as 'critical part test

  5. On the Use of Energy Storage Technologies for Regulation Services in Electric Power Systems with Significant Penetration of Wind Energy

    DEFF Research Database (Denmark)

    Yang, Bo; Makarov, Yuri; Desteese, John

    2008-01-01

    Energy produced by intermittent renewable resources is sharply increasing in the United States. At high penetration levels, volatility of wind power production could cause additional problems for the power system balancing functions such as regulation. This paper reports some partial results...... and frequently changing regulation signal. Several energy storage options have been analyzed based on thirteen selection criteria. The evaluation process resulted in the selection of flywheels, pumped hydro electric power (or conventional hydro electric power) plant and sodium sulfur or nickel cadmium batteries...... of a project work, recently conducted by the Pacific Northwest National Laboratory (PNNL) for Bonneville Power Administration (BPA). The project proposes to mitigate additional intermittency with the help of Wide Area Energy Management System (WAEMS) that would provide a two-way simultaneous regulation service...

  6. Power quality in power systems and electrical machines

    CERN Document Server

    Fuchs, Ewald

    2015-01-01

    The second edition of this must-have reference covers power quality issues in four parts, including new discussions related to renewable energy systems. The first part of the book provides background on causes, effects, standards, and measurements of power quality and harmonics. Once the basics are established the authors move on to harmonic modeling of power systems, including components and apparatus (electric machines). The final part of the book is devoted to power quality mitigation approaches and devices, and the fourth part extends the analysis to power quality solutions for renewable

  7. Electric power monthly, June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  8. Electric power monthly, August 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-24

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  9. Electric power monthly, July 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-29

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  10. Electric power monthly, November 1994

    International Nuclear Information System (INIS)

    1994-11-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended

  11. Utility-Scale Concentrating Solar Power and Photovoltaic Projects: A Technology and Market Overview

    Energy Technology Data Exchange (ETDEWEB)

    Mendelsohn, M.; Lowder, T.; Canavan, B.

    2012-04-01

    Over the last several years, solar energy technologies have been, or are in the process of being, deployed at unprecedented levels. A critical recent development, resulting from the massive scale of projects in progress or recently completed, is having the power sold directly to electric utilities. Such 'utility-scale' systems offer the opportunity to deploy solar technologies far faster than the traditional 'behind-the-meter' projects designed to offset retail load. Moreover, these systems have employed significant economies of scale during construction and operation, attracting financial capital, which in turn can reduce the delivered cost of power. This report is a summary of the current U.S. utility-scale solar state-of-the-market and development pipeline. Utility-scale solar energy systems are generally categorized as one of two basic designs: concentrating solar power (CSP) and photovoltaic (PV). CSP systems can be further delineated into four commercially available technologies: parabolic trough, central receiver (CR), parabolic dish, and linear Fresnel reflector. CSP systems can also be categorized as hybrid, which combine a solar-based system (generally parabolic trough, CR, or linear Fresnel) and a fossil fuel energy system to produce electric power or steam.

  12. Electric power in Canada, 1982

    International Nuclear Information System (INIS)

    1983-01-01

    This annual review surveys Canadian electrical power production and consumption, exports and imports, and developments in the fields of energy policy, electric space heating, and alternate energy sources. Total Canadian capacity at Dec. 31 1982 was 84 777 MW, 6 280 MW from nuclear sources. Of 1 469 MW capacity added during 1982, 680 MW were nuclear. The demand for electricity dropped to 344 083 GWh in 1982 from 346 333 GWh in 1981

  13. Energy, electricity and nuclear power estimates for the period up to 2030. July 2003 ed

    International Nuclear Information System (INIS)

    2003-01-01

    Reference Data Series No. 1 is an annual publication - currently in its twenty-second edition - containing estimates of energy, electricity and nuclear power trends up to the year 2020. Nuclear data presented in Table 1 are based on actual statistical data collected by the IAEA's Power Reactor Information System (PRIS). Energy and electricity data for 2001, however, are estimated, since the latest available information from the Department of Economic and Social Affairs of the United Nations is for 1999. Population data originate from the 'World Population Prospects' (2001 Revision), published by the Population Division of the UN Department of Economic and Social Affairs, and the 2001 values are estimates. The future growth of energy, electricity and nuclear power up to the year 2020 is presented as low and high estimates in order to encompass the uncertainties associated with the future. These estimates should be viewed as very general growth trends whose validity must constantly be subjected to critical review. The nuclear generating capacity estimates presented in Table are derived from a country by country bottom-up approach. They are established by a group of experts participating each year in the IAEA's consultancy on Nuclear Capacity Projections and based upon a review of nuclear power projects and programmes in Member States. The total energy consumption has been calculated by summing the primary energy consumption and the net secondary energy import

  14. Modeling and Nonlinear Control of Electric Power Stage in Hybrid Electric Vehicle

    DEFF Research Database (Denmark)

    Tahri, A.; El Fadil, H.; Guerrero, Josep M.

    2014-01-01

    This paper deals with the problem of modeling and controlling the electric power stage of hybrid electric vehicle. The controlled system consists of a fuel cell (FC) as a main source, a supercapacitor as an auxiliary source, two DC-DC power converters, an inverter and a traction induction motor...

  15. Sound cable crossing brings inexpensive electric power to Long Island

    International Nuclear Information System (INIS)

    Grzan, J.; Goyette, R.

    1992-01-01

    This paper reports that while many electric-utility customers in New York State benefit from inexpensive hydroelectric power from Canada and upstate New York, lack of sufficient transmission connections have prevented this electricity from reaching Long Island. However, a newly constructed underground/underwater link capable of carrying 700-MW now transmits low-cost electricity to the island, saving money for customers. The self-contained fluid-filled cable used for the underwater portion of the project is the largest underwater cable in the world. The use of high-pressure, fluid-filled pipe-type cable on the land portion represents the largest application of paper-polypropylene-paper (PPP) insulated cable in the United States. State-of-the-art technologies were implemented in the use of temperature monitoring and leak detection systems, SF 6 gas-insulated substation, and underwater cable laying and embedment techniques

  16. The research of electrical tracing system construction management and related questions of BOP project

    International Nuclear Information System (INIS)

    Wang Lining; Li Jingmin; Ma Ding; Tu Haitao

    2015-01-01

    Based on Hongyanhe nuclear power plant in Liaoning province, the paper studies the anti-freeze and heat tracing work of BOP project. It compares several different heat tracing solutions in terms of technicality and applicability, and gave the most suitable scheme by using electrical tracing. It also presents the construction details of the electrical tracing system, analyzes the key points of the construction management from quantity, safety and schedule aspects, and gave the improvement suggestions. (authors)

  17. Evaluating experience with electricity generating GHG mitigation projects

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, J.

    2003-07-01

    Several programmes have been initiated to encourage the development of projects that mitigate emissions of greenhouse gases. Recent programmes have been undertaken at the national level, such as the Dutch five-track approach, including contracts with multilateral institutions, regional development banks, private banks, bilateral contracts with countries, participation in carbon funds and the ERUPT and CERUPT tenders, Japanese Clean Development Mechanism (CDM) feasibility studies, and the more recent Finnish, Austrian and Italian JI/CDM programmes. International programmes, such as the World Bank's Prototype Carbon Fund (and other WB carbon funds), have also been initiated. Individual projects not belonging to particular programmes have also been initiated under the pilot phase of 'activities implemented jointly' (AIJ) under the United Nations Framework Convention on Climate Change (UNFCCC), or developed as CDM or Joint Implementation (JI) projects. Some CDM project activities have been formally submitted to the CDM's Executive Board (EB), who approved the first set of baseline and monitoring methodologies for CDM project activities in July 2003. There is a large variety in the type of projects that have been put forward. These include energy, industry, forestry and waste projects. This paper will focus on CDM-type projects that generate grid-connected electricity for several reasons: demand for electricity is growing rapidly in many potential host countries; many projects in the electricity sector have been developed as potential CDM and JI projects; assessing additionality and baselines is arguably more difficult for projects in the electricity sector (where a range of project types may occur as part of business-as-usual activities) than for end-of-pipe projects such as landfill gas capture and flaring or decomposition of F-gases; much work has been done on assessing appropriate methods to determine baselines in the electricity sector, at the

  18. Safety assessment of emergency electric power systems for nuclear power plants

    International Nuclear Information System (INIS)

    1986-09-01

    This paper is intended to assist the safety assessor within a regulatory body, or one working as a consultant, in assessing a given design of the Emergency Electrical Power System. Those non-electric power systems which may be used in a plant design to serve as emergency energy sources are addressed only in their general safety aspects. The paper thus relates closely to Safety Series 50-SG-D7 ''Emergency Power Systems at Nuclear Power Plants'' (1982), as far as it addresses emergency electric power systems. Several aspects are dealt with: the information the assessor may expect from the applicant to fulfill his task of safety review; the main questions the reviewer has to answer in order to determine the compliance with requirements of the NUSS documents; the national or international standards which give further guidance on a certain system or piece of equipment; comments and suggestions which may help to judge a variety of possible solutions

  19. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  20. Financing Nuclear Power Plant Projects. A New Paradigm?

    International Nuclear Information System (INIS)

    Pehuet Lucet, Fabienne

    2015-05-01

    There are currently 435 operable nuclear power reactors around the world, with a further 71 under construction. Two main proven financing models were applied to nuclear plants in the past: the national model, and the corporate model. The historical model of financing is the national model. It allowed for the most efficient risk allocation model in then-regulated national electricity markets: government or state-owned utilities with government guarantee assumed the risks of building nuclear power plants locally. The national model has proven to be efficient in France, Russia and the USA where it was modified to support private business initiatives. It was then replicated in Japan, Korea and China where significant nuclear programs were developed. In the corporate business model, the owner of the plant assumes most of the risk, but various schemes are used to mitigate the owner's risk by transmitting large areas of risks to others: vendors for construction risk as in Finland, government through loans guarantees etc. As projects became international, a set of common principles were approved by OECD countries concerning financing and the role of Export Credit Agencies. The objective was to provide competition rules whereby exporters compete on the basis of the price and quality of their products rather than the financial terms provided. Various combinations of these models were and still are implemented. Pure Project Finance was not implemented for nuclear power plants, but the model nurtures reflections about new financing models. The context in which nuclear power projects are now decided and financed changed drastically: it is a new paradigm. Risk allocation and financial conditions are at the forefront of competition to win new nuclear projects' tenders insofar as reducing uncertainties is a decisive competition edge. In a context of electricity market deregulation and high construction risks, investors and lenders require more and more securities to

  1. Progress of innovation of electrical power technology in FY2013

    International Nuclear Information System (INIS)

    Mayumi, Akihiko; Tanaka, Masanori; Yamaguchi, Hiroshi

    2014-01-01

    The following is the description of technical innovations at 12 companies including Tokyo Electric Power Company, Chubu Electric Power Company, and Japan Atomic Power Company. Tokyo Electric Power Company presented (1) the developments of a wet-type air decontaminating apparatus for inside/outside of power plant, (2) a robot to be used for field investigation at the Fukushima Daiichi nuclear power plant, (3) a visualization technology using laser for detection, and (4) removal of debris at the power plant. Chubu Electric Power Company presented application of a flap gate to the opening on exterior wall of building as a countermeasure against tsunami at the Hamaoka nuclear power plant. Hokuriku Electric Power Company presented a nuclear reactor operation training simulator for full-scope operation training for the Shika nuclear power station. Chugoku Electric Power Company presented their efforts in implementing a predictive monitoring system at the Shimane Nuclear Power Station. Shikoku Electric Power Company presented the installation of a weir with a flap gate to the interior of seawater pit as a countermeasure against tsunami. Japan Atomic Power Company presented an impact assessment method of fallout during transportation of materials caused by nuclear reactor accident, design and development of a square-type shielding container for radioactive wastes, a strength test on concrete materials for the safety design of Tsuruga Power Station Units 3 and 4, decommissioning of nuclear power plant, and research and development of the fast breeder reactor. (S.Y.)

  2. Power unit with GT-MHR reactor plant for electricity production and district heating

    International Nuclear Information System (INIS)

    Kiryushin, A.L.; Kodochigov, N.G.; Kuzavkov, N.G.; Golovko, V.F.

    2000-01-01

    Modular helium reactor with the gas turbine (GT-MHR) is a perspective power reactor plant for the next century. The project reactor is based on experience of operation more than 50 gas-cooled reactors on carbon dioxide and helium, and also on subsequent achievements in the field of realization direct gas turbine Brayton cycle. To the beginning of 90 years, achievements in technology of gas turbines, highly effective recuperators and magnetic bearings made it possible to start development of the reactor plant project combining a safe modular gas cooled reactor and a power conversion system, realizing the highly effective Brayton cycle. The conceptual project of the commercial GT-MHR reactor plant fulfilled in 1997 by joint efforts of international firms, combines a safe modular reactor with an annular active core of prismatic fuel blocks and a power conversion system with direct gas turbine cycle. The efficiency of GT-MHR gas turbine cycle at level of about 48% makes it competitive in the electricity production market in comparison with any fossil or nuclear power stations

  3. Corrosion control in electric power plants

    International Nuclear Information System (INIS)

    Syrett, B.C.

    1992-01-01

    This paper reports that corrosion of components in power plants costs the US electric power utility industry billions of dollars each year. Through the Electric Power Research Institute's (EPRI) research and development, several approaches have been developed to reduce these huge costs. They include improved materials selection procedures, coatings, cathodic protection, inhibitors, removal of aggressive species from the environment, and on-line corrosion monitoring. In addition, as part of an on-going technology transfer effort, EPRI is developing databases and expert systems that will help utilities obtain corrosion information and guide them in materials selection and failure analysis

  4. Annual Report 1999. Electric power in Sweden

    International Nuclear Information System (INIS)

    2000-07-01

    Barsebaeck 1 was closed on 30 November 1999. Barsebaeck's output of approximately 4 TWh per year will primarily be replaced by imports from coal-fired plants in Denmark and Germany. During the year, the closure of Swedish fossil-fired condensing power stations continued. With that, over 3,000 MW of peak-load power has been shut down during recent years. Consequently, situations entailing shortages of power can arise. On the deregulated electricity market, it is only the system operators that have a satisfactory overview of the overall electricity balance. The Swedish Power Association has thus lobbied the government as regards the need to elucidate Svenska Kraftnaet's responsibility. In a governmental decision from December, Svenska Kraftnaet was given the task of, among other things, monitoring the available capacity during peak loads and developing market instruments that can contribute to safeguarding the availability of power during peak loads. Svenska Kraftnaet has acquired gas turbines with a combined output power of 400 MW from Vattenfall. In order to cover the remaining requirement for rapid disruption reserves, Svenska Kraftnaet also has agreements with several power producers regarding a further 800 MW of gas turbine capacity. One further possibility lies in agreements with industry regarding the disconnection of consumption during times of peak loading. On 1 January 2000, the nuclear power tax was increased by SEK 0.005 per kWh to SEK 0.027 per kWh. This means that the nuclear power companies pay approximately SEK 1,800 MSEK per year in fiscal taxation on their nuclear power generation. The tax on electrical energy, paid by the consumer, was raised by SEK 0.011 to SEK 0.162 per kWh. The tax on diesel fuel was increased at the same time by SEK 0.25 per litre. In addition, a special network fee of SEK 0.002 per kWh came into existence in order to finance small-scale electricity generation, following removal of the obligation-to-receive system. The Swedish

  5. Annual Report 1999. Electric power in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-15

    Barsebaeck 1 was closed on 30 November 1999. Barsebaeck's output of approximately 4 TWh per year will primarily be replaced by imports from coal-fired plants in Denmark and Germany. During the year, the closure of Swedish fossil-fired condensing power stations continued. With that, over 3,000 MW of peak-load power has been shut down during recent years. Consequently, situations entailing shortages of power can arise. On the deregulated electricity market, it is only the system operators that have a satisfactory overview of the overall electricity balance. The Swedish Power Association has thus lobbied the government as regards the need to elucidate Svenska Kraftnaet's responsibility. In a governmental decision from December, Svenska Kraftnaet was given the task of, among other things, monitoring the available capacity during peak loads and developing market instruments that can contribute to safeguarding the availability of power during peak loads. Svenska Kraftnaet has acquired gas turbines with a combined output power of 400 MW from Vattenfall. In order to cover the remaining requirement for rapid disruption reserves, Svenska Kraftnaet also has agreements with several power producers regarding a further 800 MW of gas turbine capacity. One further possibility lies in agreements with industry regarding the disconnection of consumption during times of peak loading. On 1 January 2000, the nuclear power tax was increased by SEK 0.005 per kWh to SEK 0.027 per kWh. This means that the nuclear power companies pay approximately SEK 1,800 MSEK per year in fiscal taxation on their nuclear power generation. The tax on electrical energy, paid by the consumer, was raised by SEK 0.011 to SEK 0.162 per kWh. The tax on diesel fuel was increased at the same time by SEK 0.25 per litre. In addition, a special network fee of SEK 0.002 per kWh came into existence in order to finance small-scale electricity generation, following removal of the obligation-to-receive system

  6. Effective use of electric power facilities and promotion of energy conservation

    International Nuclear Information System (INIS)

    Tokumitsu, Iwao

    1999-01-01

    The capacity of Japan's commercial electric power facilities has been increased to more than 200 million kw. In order to provide a stable supply of electric power to meet constantly fluctuaring electric power demands, Japan's power plants generate electricity using an optimal combination of facilities, with nuclear power and coal-fired thermoelectric power providing the base load supply. In the use of electric power, moreover, measures are being implemented to reduce generation costs, conserve energy, and cut carbon dioxide emissions by reducing maximum output and equalizing the load. This report presents information concerning measures for improving the efficiency of electric power facilities operation, equalizing the load and promoting energy conservation. (author)

  7. Overview of electric power industry of main countries in the world

    International Nuclear Information System (INIS)

    2013-01-01

    The electric power supply system, power producer, regulation system, electricity liberalization, power demand and supply, electricity rate, development of electric power sources, nuclear power generation and renewable energy of six countries such as USA, England, German, France, Russia and China are reported. On USA, 3,754 x 10 9 kWh of total electric energy, 104 of nuclear reactors are running and giving careful consideration to safety of the plant. Shale gas production is increasing, and new technology of electric car, smart grid and demand response is developing. On England, 368 x 10 9 kWh of total electric energy, which consisted of 70.4% thermal power, 18.8% nuclear power and 10.8% renewable energy, 18 nuclear reactors are running, but almost nuclear power plants will be closed until 2023. Biomass and wind power have been developed. On German, 609 x 10 9 kWh of total electric energy, 9 nuclear reactors are running but closed till 2022, the renewable energy such as wind power and photovoltaic is introduced. On France, 542 x 10 9 kWh total electric energy, which consisted of 9% hydroelectricity, 9% thermal power, 78% nuclear power and 4% renewable energy. The renewable energy plan is formulated. On Russia, 1,052 x 10 9 kWh total electric energy consisted of 67.8% thermal power, 15.7% hydroelectricity and 16.4% nuclear power, 32 nuclear power plants are running and 9 nuclear reactors building. On China, 4,693 x 10 9 kWh power consumption, 6 nuclear power plants are running to generate 1.85% electric energy, the objects of nuclear power generation and renewable energy were announced. (S.Y.)

  8. Electric power prices, price control and competition on the European domestic electric power market. Stromtarife, Preisaufsicht und Wettbewerb im Europaeischen Binnenmarkt fuer Strom

    Energy Technology Data Exchange (ETDEWEB)

    Weigt, N

    1993-01-01

    If one speaks of electric power prices and price control in the year 1992, this subject has a different dimension than it did two or three years ago, when the new federal rate scale for electric power (ETO Elt) was drawn up and put into practice. Since the beginning of this year, a draft for guidelines which was drawn up by the EC Commission exists which, going on the assumption that the European domestic electric power market will set an example, does away with territorial protection and in the name of third party access (TPA) allows for electric power-line transit, thus introducing at least partial competition to the electric power market. We no longer think in terms of closed systems with clear-cut responsibilities in regard to power supply, which form the basis for the laws on electric power prices, the cartel laws, the practices of the electric power control board and the cartel authorities. Thus, using the new federal rate scale for electric power and its principles as formulated in Article 1 as a point of departure, developments will go in the direction of a competitive system in accordance with the ideas of the EC Commission and German free-enterprise theoreticians, as laid down for example by the deregulation commission. Thus developments will lead us away from the status quo in the direction of possible reforms, if not to say revolutionary structural changes and the consequnces which they will bring for price and cartel laws. (orig.)

  9. Electrical power system integrated thermal/electrical system simulation

    International Nuclear Information System (INIS)

    Freeman, W.E.

    1992-01-01

    This paper adds thermal properties to previously developed electrical Saber templates and incorporates these templates into a functional Electrical Power Subsystem (EPS) simulation. These combined electrical and thermal templates enable the complete and realistic simulation of a vehicle EPS on-orbit. Applications include on-orbit energy balance determinations for system load changes, initial array and battery EPS sizing for new EPS development, and array and battery technology trade studies. This effort proves the versatility of the Saber simulation program in handling varied and complex simulations accurately and in a reasonable amount of computer time. 9 refs

  10. Electric power monthly, August 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-13

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  11. Electric power monthly, September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-17

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  12. 75 FR 43519 - Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No...

    Science.gov (United States)

    2010-07-26

    ... DEPARTMENT OF ENERGY Western Area Power Administration Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No. 5 Substation and the Palo Verde Hub AGENCY... Department of Energy (DOE), is requesting SOIs from entities that are interested in purchasing transmission...

  13. Power quality load management for large spacecraft electrical power systems

    Science.gov (United States)

    Lollar, Louis F.

    1988-01-01

    In December, 1986, a Center Director's Discretionary Fund (CDDF) proposal was granted to study power system control techniques in large space electrical power systems. Presented are the accomplishments in the area of power system control by power quality load management. In addition, information concerning the distortion problems in a 20 kHz ac power system is presented.

  14. Electric power in Canada, 1990

    International Nuclear Information System (INIS)

    1991-01-01

    This report reviews the structure of the electric power industry in Canada, describes the regulatory structures that are in place, and puts the Canadian electricity industry into an international context. It presents statistics on electricity generation and consumption, imports and exports, transmission, costs and pricing, and financing. It forecasts anticipated energy demands, generating capacity and actual generation, exports, fuel requirements, and expenditures. The impacts of demand-side management and non-utility generation are discussed. (82 tabs., 23 figs.)

  15. Electric power in Canada, 1989

    International Nuclear Information System (INIS)

    1991-01-01

    This report reviews the structure of the electric power industry in Canada, describes the regulatory structures that are in place, and puts the Canadian electricity industry into an international context. It presents statistics on electricity generation and consumption, imports and exports, transmission, costs and pricing, and financing. It forecasts anticipated energy demands, generating capacity and actual generation, exports, fuel requirements, and expenditures. The impacts of demand-side management and non-utility generation are discussed. (78 tabs., 27 figs.)

  16. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  17. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1996-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  18. Proceedings: Power Plant Electric Auxiliary Systems Workshop

    International Nuclear Information System (INIS)

    1992-06-01

    The EPRI Power Plant Electric Auxiliary Systems Workshop, held April 24--25, 1991, in Princeton, New Jersey, brought together utilities, architect/engineers, and equipment suppliers to discuss common problems with power plant auxiliary systems. Workshop participants presented papers on monitoring, identifying, and solving problems with auxiliary systems. Panel discussions focused on improving systems and existing and future plants. The solutions presented to common auxiliary system problems focused on practical ideas that can enhance plant availability, reduce maintenance costs, and simplify the engineering process. The 13 papers in these proceedings include: Tutorials on auxiliary electrical systems and motors; descriptions of evaluations, software development, and new technologies used recently by electric utilities; an analysis of historical performance losses caused by power plant auxiliary systems; innovative design concepts for improving auxiliary system performance in future power plants

  19. Improving the taxation regime for electric power

    International Nuclear Information System (INIS)

    Fjermeros, Morten; Ilstad, Kristine

    2003-01-01

    In Norway, the present taxation regime for electric power is very complex. The power companies are currently charged with ordinary tax on profits, tax on economic rent, tax on natural resources and land tax. In addition there are the rules about licence fees, yield of power due to concession conditions, and reversion. The Norwegian Electricity Industry Association (EBL), assisted by a firm of lawyers, has proposed an improvement over the current taxation regime

  20. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  1. Electric power monthly, May 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Statistics by company and plant are published on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  2. Electric power monthly, April 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the U.S., Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. This April 1994 issue contains 1993 year-end data and data through January 1994.

  3. Microelectronics in power electronics and electrical drives

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    From October, 1214, 1982 at Darmstadt (FRG) a meeting took place on ''Microelectronics in power electronics and Electrical Drives''. This volume contains the papers of the 65 lectures, held at the symposium. For each of the 10 papers dealing with problems on electric-powered vehicles a separate subject analysis has been carried out.

  4. The price of electricity from private power producers

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.; Milne, A.; Kito, S.

    1993-10-01

    The long-term wholesale electricity market is becoming increasingly competitive. Bidding for power contracts has become a dominant form of competition in this sector. The prices which emerge from this process have not been documented and compared in a systematic framework. This paper introduces a method to make such comparisons and illustrates it on a small sample of projects. This results show a wide range of prices for what is essentially the same technology, gas-fired combined cycle generation. The price range seems greater than what could be explained by transmission cost differences between high and low cost regions. For the smaller sample of coal-fired projects, price variation is substantially less. Further data collection and analysis should be able to help isolate more clearly what market or cost factors are responsible for the observed variation.

  5. TQC works in newly-built nuclear power plant and main electric power system plannings

    International Nuclear Information System (INIS)

    Akiyama, Yoshihisa; Kawakatsu, Tadashi; Hashimoto, Yasuo

    1985-01-01

    In the Kansai Electric Power Co., Inc., TQC has been introduced to solve such major problems in nuclear power generation as the securing of nuclear power reliability, the suppression of rises in the costs, the reduction in long periods of power failure and the promotion in siting of nuclear power plants. It is thus employed as a means of the ''creation of a slim and tough business constitution''. The state of activities in Kansai Electric are described in quality assurance of a newly-built nuclear power plant and in raising the reliability of the main electric power system to distribute the generated nuclear power and further the future prospects are explained. (Mori, K.)

  6. Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, M.

    2006-10-31

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and DaimlerChrysler) announced in January 2002 a new cooperative research effort. Known as FreedomCAR (derived from 'Freedom' and 'Cooperative Automotive Research'), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieve the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Vehicle Systems subprogram within the FreedomCAR and Vehicle Technologies Program provides support and guidance for many cutting-edge automotive and heavy truck technologies now under development. Research is focused on understanding and improving the way the various new components of tomorrow's automobiles and heavy trucks will function as a unified system to improve fuel efficiency. This work also supports the development of advanced automotive accessories and the reduction of parasitic losses (e.g., aerodynamic drag, thermal management, friction and wear, and rolling resistance). In supporting the development of hybrid propulsion systems, the Vehicle Systems subprogram has enabled the development of technologies that will significantly improve fuel economy, comply with projected emissions and safety regulations, and use fuels produced domestically. The Vehicle Systems subprogram supports the efforts of the FreedomCAR and Fuel Partnership and the 21st Century Truck Partnership through a three-phase approach intended to: (1) Identify overall propulsion and vehicle-related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then develop the appropriate

  7. Power generation investment in electricity markets

    International Nuclear Information System (INIS)

    2003-01-01

    Most IEA countries are liberalizing their electricity markets, shifting the responsibility for financing new investment in power generation to private investors. No longer able to automatically pass on costs to consumers, and with future prices of electricity uncertain, investors face a much riskier environment for investment in electricity infrastructure. This report looks at how investors have responded to the need to internalize investment risk in power generation. While capital and total costs remain the parameters shaping investment choices, the value of technologies which can be installed quickly and operated flexibly is increasingly appreciated. Investors are also managing risk by greater use of contracting, by acquiring retail businesses, and through mergers with natural gas suppliers. While liberalization was supposed to limit government intervention in the electricity market, volatile electricity prices have put pressure on governments to intervene and limit such prices. This study looks at several cases of volatile prices in IEA countries' electricity markets, and finds that while market prices can be a sufficient incentive for new investment in peak capacity, government intervention into the market to limit prices may undermine such investment

  8. Thermal Management of Power Electronics and Electric Motors for Electric-Drive Vehicles (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, S.

    2014-09-01

    This presentation is an overview of the power electronics and electric motor thermal management and reliability activities at NREL. The focus is on activities funded by the Department of Energy Vehicle Technologies Office Advanced Power Electronics and Electric Motors Program.

  9. Guide for prioritizing power plant productivity improvement projects: handbook of availability improvement methodology

    International Nuclear Information System (INIS)

    1981-01-01

    As part of its program to help improve electrical power plant productivity, the Department of Energy (DOE) has developed a methodology for evaluating productivity improvement projects. This handbook presents a simplified version of this methodology called the Availability Improvement Methodology (AIM), which provides a systematic approach for prioritizing plant improvement projects. Also included in this handbook is a description of data taking requirements necessary to support the AIM methodology, benefit/cost analysis, and root cause analysis for tracing persistent power plant problems. In applying the AIM methodology, utility engineers should be mindful that replacement power costs are frequently greater for forced outages than for planned outages. Equivalent availability includes both. A cost-effective ranking of alternative plant improvement projects must discern between those projects which will reduce forced outages and those which might reduce planned outages. As is the case with any analytical procedure, engineering judgement must be exercised with respect to results of purely mathematical calculations

  10. Wireless electricity (Power) transmission using solar based power satellite technology

    International Nuclear Information System (INIS)

    Maqsood, M; Nasir, M Nauman

    2013-01-01

    In the near future due to extensive use of energy, limited supply of resources and the pollution in environment from present resources e.g. (wood, coal, fossil fuel) etc, alternative sources of energy and new ways to generate energy which are efficient, cost effective and produce minimum losses are of great concern. Wireless electricity (Power) transmission (WET) has become a focal point as research point of view and nowadays lies at top 10 future hot burning technologies that are under research these days. In this paper, we present the concept of transmitting power wirelessly to reduce transmission and distribution losses. The wired distribution losses are 70 – 75% efficient. We cannot imagine the world without electric power which is efficient, cost effective and produce minimum losses is of great concern. This paper tells us the benefits of using WET technology specially by using Solar based Power satellites (SBPS) and also focuses that how we make electric system cost effective, optimized and well organized. Moreover, attempts are made to highlight future issues so as to index some emerging solutions.

  11. Environmental challenges and opportunities of the evolving North American electricity market : Estimating future air pollution from new electric power generation

    International Nuclear Information System (INIS)

    Miller, P.; Patterson, Z.; Vaughan, S.

    2002-06-01

    A significant source of air pollutants and greenhouse gases in North America is a direct result of the generation of electricity from the combustion of fossil fuels. An attempt at estimating the future emissions of four key pollutants from the electricity generation sector in North America was made by the authors in this paper. They based their estimates on projections of future electricity generation capacity changes. They looked at new power plant projects in North America, as well as the expected changes in emissions as a result of these projects compared to the historical data originating from power plant emissions in the recent past. Both the local context and the national level were examined. Nitrogen oxides, sulfur dioxide, mercury, and carbon dioxide, all arising from the combustion of fossil fuels, were considered in this paper. Ground level ozone, or smog results from nitrogen oxides. Acidic deposition, also called acid rain, is caused in part by both nitrogen oxides and sulfur dioxide, as is fine particles in the atmosphere linked to lung damage and premature death. Fish consumption advisories were issued due to the levels of toxic mercury deposited in lakes and streams. Global climate change is caused in part to the greenhouse gas carbon dioxide. Air quality and climate change will both be impacted by the future evolution of the electricity generation sector in an integrated North American energy market. The authors attempted to provide a baseline of air emissions from that sector in North America for a common reference year, enabling the tracking of changes in emissions patterns in the future. A reference case inventory for the four pollutants was estimated, followed by the development of two boundary cases estimating future emissions in 2007. refs., 22 tabs

  12. Recent advances in nuclear powered electric propulsion for space exploration

    International Nuclear Information System (INIS)

    Cassady, R. Joseph; Frisbee, Robert H.; Gilland, James H.; Houts, Michael G.; LaPointe, Michael R.; Maresse-Reading, Colleen M.; Oleson, Steven R.; Polk, James E.; Russell, Derrek; Sengupta, Anita

    2008-01-01

    Nuclear and radioisotope powered electric thrusters are being developed as primary in space propulsion systems for potential future robotic and piloted space missions. Possible applications for high-power nuclear electric propulsion include orbit raising and maneuvering of large space platforms, lunar and Mars cargo transport, asteroid rendezvous and sample return, and robotic and piloted planetary missions, while lower power radioisotope electric propulsion could significantly enhance or enable some future robotic deep space science missions. This paper provides an overview of recent US high-power electric thruster research programs, describing the operating principles, challenges, and status of each technology. Mission analysis is presented that compares the benefits and performance of each thruster type for high priority NASA missions. The status of space nuclear power systems for high-power electric propulsion is presented. The paper concludes with a discussion of power and thruster development strategies for future radioisotope electric propulsion systems

  13. Recent advances in nuclear powered electric propulsion for space exploration

    Energy Technology Data Exchange (ETDEWEB)

    Cassady, R. Joseph [Aerojet Corp., Redmond, CA (United States); Frisbee, Robert H. [Jet Propulsion Laboratory, Pasadena, CA (United States); Gilland, James H. [Ohio Aerospace Institute, Cleveland, OH (United States); Houts, Michael G. [NASA Marshall Space Flight Center, Huntsville, AL 35812 (United States); LaPointe, Michael R. [NASA Marshall Space Flight Center, Huntsville, AL 35812 (United States)], E-mail: michael.r.lapointe@nasa.gov; Maresse-Reading, Colleen M. [Jet Propulsion Laboratory, Pasadena, CA (United States); Oleson, Steven R. [NASA Glenn Research Center, Cleveland, OH (United States); Polk, James E. [Jet Propulsion Laboratory, Pasadena, CA (United States); Russell, Derrek [Northrop Grumman Space Technology, Redondo Beach, CA (United States); Sengupta, Anita [Jet Propulsion Laboratory, Pasadena, CA (United States)

    2008-03-15

    Nuclear and radioisotope powered electric thrusters are being developed as primary in space propulsion systems for potential future robotic and piloted space missions. Possible applications for high-power nuclear electric propulsion include orbit raising and maneuvering of large space platforms, lunar and Mars cargo transport, asteroid rendezvous and sample return, and robotic and piloted planetary missions, while lower power radioisotope electric propulsion could significantly enhance or enable some future robotic deep space science missions. This paper provides an overview of recent US high-power electric thruster research programs, describing the operating principles, challenges, and status of each technology. Mission analysis is presented that compares the benefits and performance of each thruster type for high priority NASA missions. The status of space nuclear power systems for high-power electric propulsion is presented. The paper concludes with a discussion of power and thruster development strategies for future radioisotope electric propulsion systems.

  14. Slovak electric power systems 1920 - 1994

    International Nuclear Information System (INIS)

    Sladek, V.

    1996-01-01

    The purpose of this book is to present the picture of more than 110-year old history of the building and maintenance of power stations in Slovakia. The beginnings were the same as elsewhere in the world. Small, local sources of electrical energy had been built for own needs and it had lasted for decades, until people realized that electricity could be produced for the whole communities and towns and that there was a possibility of the supply of the electricity for public. The purposeful electrification although started in this country only after the World War I, after the Law No. 438/1918 had been issued. While the period till the World War I has the character of endless experiments of utilizing electrical industry, transport, agriculture and households, the period after World War I is explicitly focused on building of unified electrification system for production, transport and distribution of electrical energy. Instead of course, the experts are trained for the first time at professional technical schools and after the year 1943 also at the School of Technology in Bratislava, the predecessor of the University of technology and at the other professional schools. Time is ready. The demand for electrical energy is growing together with the power of generators and voltage level of distribution lines. Besides the energy supply, also power plants, production and supply of heat started to be prosperous, especially in the regions where conditions for such activities had been provided. The changes in the 'power station family' are also registered in the legislative documents, which better present and explain the new historical circumstances. The lives of power station employees were deeply affected by many political and war event in the period of the World War II. In spite of this fact, they could manage their tasks also in these extraordinary conditions. The short part is about the social security of employees. The conclusion contains also basic conceptions envisaged for

  15. Wireless power transfer for electric vehicle

    OpenAIRE

    Mude, Kishore Naik

    2015-01-01

    Wireless Power Transfer (WPT) systems transfer electric energy from a source to a load without any wired connection. WPTs are attractive for many industrial applications because of their advantages compared to the wired counterpart, such as no exposed wires, ease of charging, and fearless transmission of power in adverse environmental conditions. Adoption of WPTs to charge the on-board batteries of an electric vehicle (EV) has got attention from some companies, and efforts are being made for ...

  16. The electric power industry in Norway

    International Nuclear Information System (INIS)

    Baleo, J.N.; Anthoine, K.; Vallon, D.; Baleo, V.

    2003-03-01

    As more than 99% of the electric power in Norway come from the hydro energy, the climatic conditions influence the energy prices. Since 1996 and because of an increasing consumption, the country needs to import electric power from Sweden, Denmark, Finland and for a little part Russia. This report evaluates the today situation, the distribution and production sources, the regulations, the Government policy and the research programs concerning the ''classical energy sources'' and the renewable energies. (A.L.B.)

  17. Electricity supply. The effects of competitive power purchases are not yet certain

    International Nuclear Information System (INIS)

    England-Joseph, Judy; Wood, David G.; Bausell, Charles W. Jr.; Farah, Philip G.; Alexander, Alice M.; Griffes, Peter H.; Jorritsma, James S.; Skud, Bruce; Dunbrack, Linda W.

    1990-08-01

    generators, these utilities act to ensure the reliability of service through establishing project selection criteria and contract terms, which consider, for example, a source's ability to dispatch power on demand and to demonstrate sound financing. These utilities also have contingency plans if competitively purchased power is not delivered as planned. Determining competitive bidding's long-term effects on the cost of electricity requires estimating the future costs and demand for electricity. These estimates are uncertain because they rely on assumptions about unknown factors like future fuel prices. All three utilities estimated the cost of competitively purchased power to be less than the cost of generating it themselves or purchasing it from another source, such as a neighboring utility. Potential impacts on cost depend in part on how utilities design their bidding systems, for example, on whether utilities announce a ceiling price they are willing to pay. Also, potential impacts on cost could be affected by constraints that limit the number of eligible participants in wholesale markets, such as a lack of access to transmission facilities

  18. An options model for electric power markets

    International Nuclear Information System (INIS)

    Ghosh, Kanchan; Ramesh, V.C.

    1997-01-01

    The international electric utility industry is undergoing a radical transformation from an essentially regulated and monopolistic industry to an industry made uncertain with impending deregulation and the advent of competitive forces. This paper investigates the development of an options market for bulk power trading in a market setup while considering power system planning and operational constraints and/or requirements. In so doing it considers the different market based financial derivative instruments while can be used to trade electrical power in bulk and examines how established tools such as Optimal Power Flow (OPF) may be applied in helping to develop a price for bulk power transactions under a market based setup. (Author)

  19. Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming

    Science.gov (United States)

    Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji

    In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.

  20. Present state of electric power business in United States and Europe

    International Nuclear Information System (INIS)

    Onishi, Kenichi

    2011-01-01

    This article reported present state of nuclear power and electric power business in United States and Europe after Fukushima Daiichi Accident. As for the trend of demand and supply of electric power and policy, the accident forced Germany possibly to proceed with phase-out of nuclear power, but France and United States to sustain nuclear power with no great change of energy policy at this moment. As for the trend of electric power market, there was not state in United States with liberalized retail market of electric power after rolling blackouts occurred in California State in the early 2000s. In Germany proceeding with renewable energy introduction, renewable electricity fed into the grid was paid for by the network operators at fixed tariffs and the costs passed on to electricity consumers were increasing. Renewable Portfolio Standards (RPS) in United States forced the state to introduction of renewable energy to some ratio, and Feed-in Tariff (FIT) introduced in EU in 1990s lead to introduction of a large amount of renewable electricity targeted in 2020. Huge amount of wind power introduction brought about several problems to solve such that excess electric power above domestic demand had bad effects on grids in neighboring region. Enforcement of power transmission lines was also needed with increase of maximum electric power as well as introduction of a large amount of renewable electricity. (T. Tanaka)

  1. Massachusetts Fuel Cell Bus Project: Demonstrating a Total Transit Solution for Fuel Cell Electric Buses in Boston

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The Federal Transit Administration's National Fuel Cell Bus Program focuses on developing commercially viable fuel cell bus technologies. Nuvera is leading the Massachusetts Fuel Cell Bus project to demonstrate a complete transit solution for fuel cell electric buses that includes one bus and an on-site hydrogen generation station for the Massachusetts Bay Transportation Authority (MBTA). A team consisting of ElDorado National, BAE Systems, and Ballard Power Systems built the fuel cell electric bus, and Nuvera is providing its PowerTap on-site hydrogen generator to provide fuel for the bus.

  2. Quality electricity lines of external power systems electric traction DC

    Directory of Open Access Journals (Sweden)

    A.V. Petrov

    2012-08-01

    Full Text Available The results of studies that compare and analyze the numerical values of some key indicators quality electricity in the lines of the external power supply system the electric traction DC. As a supplement are additional and fundamental values of energy losses in them.

  3. Electric power monthly, April 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national Census division, and State level. The purpose of this publication is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data are given for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatt hour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, statistics at the company and plant level are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 6 figs., 57 tabs

  4. Multiagent based protection and control in decentralized electric power systems

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Veloso, Manuela

    2010-01-01

    Electric power systems are going through a major change both in their physical and control structure. A large num- ber of small and geographically dispersed power generation units (e.g., wind turbines, solar cells, plug-in electric cars) are replacing big centralized power plants. This shift has...... created interesting possibilities for application of intelligent systems such as multiagent systems for control and automation in electric power systems. This paper describes work on designing a multiagent system for protection and control of electric power distribution networks.It demonstrates how...... explicit modeling of capabilities, states, roles and role transition in agents can capture the control and automation in electric power systems. We present illustrative results from using our proposed schema in realistic simulations....

  5. Costs of electric power generation in different types of power plants

    International Nuclear Information System (INIS)

    Weible, H.

    1977-01-01

    In the framework of our study 'energy - environment - industry' we need among other things the costs of electric power generation. We register their structure in a sub-model. Recently there was disagreement on effective costs of electric power generation particularly when comparing fossil-fuel power plants to nuclear power plants. For this reason, expertises on the costs of electric power generation in nuclear and fossil-fuel power plants were ordered with the Energy-Economic Institute in Cologne as well as with the Battelle Institute in Frankfurt. In the framwork of our paper on the system 'energy - environment - industry' we do not want to give new data potentially required for our task, before the expertises will be finished. Therefore the results given in part III of this lecture are only meant as an example in order to show possible consequences of the cost programs set up, depending on initial data whose general recognition is to be aimed at. Furthermore, the theoretical approach to investment calculation has to win general recognition when recording calculation methods computer-compatibly. Any new formulations discussed in industrial management have not been taken into account. (orig.) [de

  6. Organizational culture and knowledge management in the electric power generation industry

    Science.gov (United States)

    Mayfield, Robert D.

    Scarcity of knowledge and expertise is a challenge in the electric power generation industry. Today's most pervasive knowledge issues result from employee turnover and the constant movement of employees from project to project inside organizations. To address scarcity of knowledge and expertise, organizations must enable employees to capture, transfer, and use mission-critical explicit and tacit knowledge. The purpose of this qualitative grounded theory research was to examine the relationship between and among organizations within the electric power generation industry developing knowledge management processes designed to retain, share, and use the industry, institutional, and technical knowledge upon which the organizations depend. The research findings show that knowledge management is a business problem within the domain of information systems and management. The risks associated with losing mission critical-knowledge can be measured using metrics on employee retention, recruitment, productivity, training and benchmarking. Certain enablers must be in place in order to engage people, encourage cooperation, create a knowledge-sharing culture, and, ultimately change behavior. The research revealed the following change enablers that support knowledge management strategies: (a) training - blended learning, (b) communities of practice, (c) cross-functional teams, (d) rewards and recognition programs, (e) active senior management support, (f) communication and awareness, (g) succession planning, and (h) team organizational culture.

  7. NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  8. The Increase of Power Efficiency of Underground Coal Mining by the Forecasting of Electric Power Consumption

    Science.gov (United States)

    Efremenko, Vladimir; Belyaevsky, Roman; Skrebneva, Evgeniya

    2017-11-01

    In article the analysis of electric power consumption and problems of power saving on coal mines are considered. Nowadays the share of conditionally constant costs of electric power for providing safe working conditions underground on coal mines is big. Therefore, the power efficiency of underground coal mining depends on electric power expense of the main technological processes and size of conditionally constant costs. The important direction of increase of power efficiency of coal mining is forecasting of a power consumption and monitoring of electric power expense. One of the main approaches to reducing of electric power costs is increase in accuracy of the enterprise demand in the wholesale electric power market. It is offered to use artificial neural networks to forecasting of day-ahead power consumption with hourly breakdown. At the same time use of neural and indistinct (hybrid) systems on the principles of fuzzy logic, neural networks and genetic algorithms is more preferable. This model allows to do exact short-term forecasts at a small array of input data. A set of the input parameters characterizing mining-and-geological and technological features of the enterprise is offered.

  9. Electric-powered cars in Austria - status and prospects

    International Nuclear Information System (INIS)

    Propper, B.

    1993-01-01

    The number of electric-powered vehicles in Austria is estimated to be 300 at the most. In this article, the reasons for such a low number is being looked at. Austria is ideally located with respect to producing electricity, as two thirds of it are produced by water-power. However, there are only three direct ways of state funding in order to reduce the cost. In the framework of a field test, the use of electric-powered vehicles for community-use is being successfully carried out in Vienna. (orig.) [de

  10. Innovations in techniques of electric power in 2008

    International Nuclear Information System (INIS)

    Ohfusa, Takahiro; Endo, Yukio; Ino, Hiroyuki

    2009-01-01

    Tokyo Electric Power Company (TEPCO), Kansai Electric Power Co., Inc., Tohoku Electric Power and other nine companies reported the results of innovations in techniques of electric power in 2008, Japan. J-Power started construction of the Ohma Nuclear Power Plant (power generating capacity: 1,383 MW, ABWR) in Ohma Town, Aomori prefecture, Japan, in May 2008. TEPCO developed the low vibration control valve and carried out the model experiments using air as fluid and the simulation by computational fluid dynamics. Mach number distribution (ε L =0.068) at the valve showed change of the supersonic jet flow as time advanced and a periodic pressure change on the valve and valve seat. Japan Atomic Power Company reported development of techniques for the established nuclear power station such as control of pipe thinning of the secondary system of PWR by insertion of oxygen at Tsuruga Power Station Unit 2, risk evaluation, the effects of increase of generating power on aging deterioration, and development of heat protective clothing. Researched are a power generation plant of small-and-medium-size reactors which took in reforming technology using the location to a narrow site, funds by stakeholders and the idea of future 'fast breeder reactor system', sodium-cooled loop type reactor, which uses TRU as fuel. The accumulator tank of new type safety system for Tsuruga Power Station Unit 3 and 4 is designed and tested. Decommissioning process of Tokai Power Plant and recycling of shielding materials, blocks and concrete powder are stated. (S.Y.)

  11. Economic risks of the capacity expansion of electric power generation: impact of the nuclear energy

    International Nuclear Information System (INIS)

    Nieva G, R.

    2009-01-01

    Uncertainty and risks are inherent to the electric systems planning. The long period of construction that is characteristic of the electric sector works, as well as the long useful life of the generation assets and electric power transmission, they force to plan the expansion of the electric systems along horizons from 10 to 25 years. In periods so long of time it is impossible to predict with certainty the elements of the environment that could influence in the taking of decisions, like they are: the growth and the distribution of the electric power demand, the readiness and fuel prices; the investment costs of the technological options of generation and transmission, as well as the duration of the construction of future projects of new capacity addition. All expansion plan that will be propose, will be exposed to the uncertainty of the environment, gives place to risks or undesirable consequences. The nature of the risks, the strategies to delimit them and the outlines to assign them between the different interested parts and the diverse economic agents, depend in great measure of the legal and normative mark of the sector. In this work these topics are approached inside the reference mark of the Mexican public service of electric power. (Author)

  12. Making connections: Case studies of interconnection barriers and their impact on distributed power projects

    Energy Technology Data Exchange (ETDEWEB)

    Alderfer, B.; Eldridge, M.; Starrs, T.

    2000-07-25

    Distributed power is modular electric generation or storage located close to the point of use. Based on interviews of distributed generation project proponents, this report reviews the barriers that distributed generators of electricity are encountering when attempting to interconnect to the electrical grid. Descriptions of 26 of 65 case studies are included in the report. The survey found and the report describes a wide range of technical, business-practice, and regulatory barriers to interconnection. An action plan for reducing the impact of these barriers is also included.

  13. The development of electric power/energy trading in Norway

    International Nuclear Information System (INIS)

    Engebretsen, J.D.

    1992-01-01

    One of the main aims of the Norwegian government is to make the electric power market more effective. A new energy law has been passed and other initiatives have been taken which have altered the framework of the conditions for electricity production and sales in Norway. The proposition for trading electric power and the development of new policies for calculating transmission tariffs has been dealt with in addition to plans for the extent of the development of hydroelectric power. Norway is the world's sixth largest producer of hydroelectricity. The domestic supply of electricity is described as well as the nature of the reorganization of the transmission of electricity and Norwegian foreign trade proposals within this area. The government is interested in taxing with regard to production instead of on the power itself in order to stimulate better energy economy. It is important that this will have a neutral effect between export and domestic consumption when contract sales to abroad are initiated. A more efficient electric power market will profit Norwegian society. Statistical data are included. (AB)

  14. Results of an electrical power system fault study

    Science.gov (United States)

    Dugal-Whitehead, Norma R.; Johnson, Yvette B.

    1992-01-01

    NASA-Marshall conducted a study of electrical power system faults with a view to the development of AI control systems for a spacecraft power system breadboard. The results of this study have been applied to a multichannel high voltage dc spacecraft power system, the Large Autonomous Spacecraft Electrical Power System (LASEPS) breadboard. Some of the faults encountered in testing LASEPS included the shorting of a bus an a falloff in battery cell capacity.

  15. Geothermal electric power generation in Iceland for the proposed Iceland/United Kingdom HVDC power link

    International Nuclear Information System (INIS)

    Hammons, T.J.; Palmason, G.; Thorhallsson, S.

    1991-01-01

    The paper reviews geothermal electric power potential in Iceland which could economically be developed to supplement hydro power for the proposed HVDC Power Link to the United Kingdom, and power intensive industries in Iceland, which are envisaged for development at this time. Technically harnessable energy for electricity generation taking account of geothermal resources down to an assumed base depth, temperature distribution in the crust, probable geothermal recovery factor, and accessibility of the field, has been assessed. Nineteen known high-temperature fields and 9 probable fields have been identified. Technically harnessable geo-heat for various areas is indicated. Data on high temperature fields suitable for geothermal electric power generation, and on harnessable energy for electric power generation within volcanic zones, is stated, and overall assessments are made. The paper then reviews how the potential might be developed, discussing preference of possible sites, and cost of the developments at todays prices. Cost of geothermal electric power generation with comparative costs for hydro generation are given. Possible transmission system developments to feed the power to the proposed HVDC Link converter stations are also discussed

  16. Price sensitive electric power consumption in households. Final report; Prisfoelsomt elforbrug i husholdninger. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Togeby, M.; Hay, C. (Ea Energianalyse A/S, Copenhagen (Denmark))

    2009-08-15

    To gain experience with electric power consumption in households based on demand response a demonstration project was carried out for households with electric heating. More than 500 households with high power consumption (over 15,000 kWh / yr) participated. Participating households were divided into four groups: 1) a group with automation equipment ('Devi') installed, which automatically controls the electric heating in relation to electricity price signals based on pre-defined standards, 2) a group with electronics equipment ('Electronic House Keeper') installed which can show price signals so that the participant himself can control the electric heating in relation thereto, 3) a group who daily received an e-mail or a text message indicating the fluctuations in electricity prices, so that the participant can control the electric heating in relation to the received information, 4) a control group who did not have knowledge of or participated in the experiment. The main results of the project are that consumption must be controlled through automation. A real impact of the experiment can only be seen for the Devi group, which had automation equipment installed, and not for the email / text message group who had to manually respond to price signals. There must be opportunities for higher degree of differentiation. The automatics should be coupled to multiple thermostats, and the control should be detailed, for example, with control based on the individual thermostat in each room. The thermal comfort is essential. The participants want to manage and move their electricity consumption directly via 'Electronic House Keeper'. They would welcome the opportunity to have all household appliances connected to the solution, making it possible to turn on / off these depending on prices. Good information and communication are crucial to participants' motivation. (ln)

  17. PCA Fault Feature Extraction in Complex Electric Power Systems

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2010-08-01

    Full Text Available Electric power system is one of the most complex artificial systems in the world. The complexity is determined by its characteristics about constitution, configuration, operation, organization, etc. The fault in electric power system cannot be completely avoided. When electric power system operates from normal state to failure or abnormal, its electric quantities (current, voltage and angles, etc. may change significantly. Our researches indicate that the variable with the biggest coefficient in principal component usually corresponds to the fault. Therefore, utilizing real-time measurements of phasor measurement unit, based on principal components analysis technology, we have extracted successfully the distinct features of fault component. Of course, because of the complexity of different types of faults in electric power system, there still exists enormous problems need a close and intensive study.

  18. Project considerations and design of systems for wheeling cogenerated power

    Energy Technology Data Exchange (ETDEWEB)

    Tessmer, R.G. Jr.; Boyle, J.R.; Fish, J.H. III; Martin, W.A.

    1994-08-01

    Wheeling electric power, the transmission of electricity not owned by an electric utility over its transmission lines, is a term not generally recognized outside the electric utility industry. Investigation of the term`s origin is intriguing. For centuries, wheel has been used to describe an entire machine, not just individual wheels within a machine. Thus we have waterwheel, spinning wheel, potter`s wheel and, for an automobile, wheels. Wheel as a verb connotes transmission or modification of forces and motion in machinery. With the advent of an understanding of electricity, use of the word wheel was extended to be transmission of electric power as well as mechanical power. Today, use of the term wheeling electric power is restricted to utility transmission of power that it doesn`t own. Cogeneration refers to simultaneous production of electric and thermal power from an energy source. This is more efficient than separate production of electricity and thermal power and, in many instances, less expensive.

  19. Medium-term electric power demand forecasting based on economic-electricity transmission model

    Science.gov (United States)

    Li, Wenfeng; Bao, Fangmin; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Mao, Yubin; Wang, Jiangbo; Liu, Junhui

    2018-06-01

    Electric demand forecasting is a basic work to ensure the safe operation of power system. Based on the theories of experimental economics and econometrics, this paper introduces Prognoz Platform 7.2 intelligent adaptive modeling platform, and constructs the economic electricity transmission model that considers the economic development scenarios and the dynamic adjustment of industrial structure to predict the region's annual electricity demand, and the accurate prediction of the whole society's electricity consumption is realized. Firstly, based on the theories of experimental economics and econometrics, this dissertation attempts to find the economic indicator variables that drive the most economical growth of electricity consumption and availability, and build an annual regional macroeconomic forecast model that takes into account the dynamic adjustment of industrial structure. Secondly, it innovatively put forward the economic electricity directed conduction theory and constructed the economic power transfer function to realize the group forecast of the primary industry + rural residents living electricity consumption, urban residents living electricity, the second industry electricity consumption, the tertiary industry electricity consumption; By comparing with the actual value of economy and electricity in Henan province in 2016, the validity of EETM model is proved, and the electricity consumption of the whole province from 2017 to 2018 is predicted finally.

  20. Th european market of the electric power

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the CRE (commission of the Electric power Control) progress report concerning the first july 2000 to the 30 june 2001. Three main subjects are discussed, illustrated by economic data and graphs: the electric power european market, the french market control and the CRE. A special interest is given to the deregulation of the market and its consequences. (A.L.B.)

  1. Common issues concerning electric power and gas

    International Nuclear Information System (INIS)

    1996-01-01

    EDF and GDF, the French government owned electric power and gas utilities have jointly decided to improve their employment and employee situation with the hiring of 11000 to 15000 young people for a 3-year period and the reduction of the working hours. A european disagreement is to be judged concerning electric power and gas import and export monopolies in several european countries

  2. History of electric power technological innovation in 2017

    International Nuclear Information System (INIS)

    Yamaguchi, Hiroshi; Okabe, Kazuhiko; Ichimura, Yasunori

    2017-01-01

    This is an overview of the electric power technology innovation of 12 electric power companies in 2016. Among them, this paper outlines the technological contents related to nuclear power of three major companies. TEPCO group applied a sealant from the outside to the back-up seal of reactor containment vessel that had deteriorated. It developed a good sealing system by combining with an improved sealant, and confirmed the effect at an experimental level. Regarding environmental restoration in Fukushima, TEPCO developed a personal dosimetry technology, environmental monitoring technology, and a technology to simulate radiation reduction amount after decontamination. Chubu Electric Power Company conducted researches on the applicability of the start-up range neutron monitor count rate prediction method related to fuel loading after a long-term shut-down of nuclear power generation, basic examination for practical use of laser decontamination, and possibility of tsunami prediction using satellite positioning information. With regard to the decommissioning measures of nuclear power plants, Japan Nuclear Power Electric Generation Co., Ltd. conducted studies on the decommissioning work of the Tokai Power Station, the safe dismantling method of the Tsuruga Power Station Unit 1 as decommissioning measures and fuel management, and the disposal method of radioactive contaminants. In the development of future reactor, this company conducted research on the development of fast breeder reactor system, etc. (A.O.)

  3. Results of an electrical power system fault study (CDDF)

    Science.gov (United States)

    Dugal-Whitehead, N. R.; Johnson, Y. B.

    1993-01-01

    This report gives the results of an electrical power system fault study which has been conducted over the last 2 and one-half years. First, the results of the literature search into electrical power system faults in space and terrestrial power system applications are reported. A description of the intended implementations of the power system faults into the Large Autonomous Spacecraft Electrical Power System (LASEPS) breadboard is then presented. Then, the actual implementation of the faults into the breadboard is discussed along with a discussion describing the LASEPS breadboard. Finally, the results of the injected faults and breadboard failures are discussed.

  4. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  5. Energy managment strategies for vehicular electric power systems

    NARCIS (Netherlands)

    Koot, M.W.T.; Kessels, J.T.B.A.; Jager, de A.G.; Heemels, W.P.M.H.; Bosch, van den P.P.J.; Steinbuch, M.

    2005-01-01

    In the near future, a significant increase in electric power consumption in vehicles is expected. To limit the associated increase in fuel consumption and exhaust emissions, smart strategies for the generation, storage/retrieval, distribution, and consumption of electric power will be used. Inspired

  6. Summary assessment of solar thermal parabolic dish technology for electrical power generation

    Science.gov (United States)

    Penda, P. L.; Fujita, T.; Lucas, J. W.

    1985-01-01

    An assessment is provided of solar thermal parabolic dish technology for electrical power generation. The assessment is based on the development program undertaken by the Jet Propulsion Laboratory for the U.S. Department of Energy and covers the period from the initiation of the program in 1976 through mid-1984. The program was founded on developing components and subsystems that are integrated into parabolic dish power modules for test and evaluation. The status of the project is summarized in terms of results obtained through testing of modules, and the implications of these findings are assessed in terms of techno-economic projections and market potential. The techno-economic projections are based on continuation of an evolutionary technological development program and are related to the accomplishments of the program as of mid-1984. The accomplishments of the development effort are summarized for each major subsystem including concentrators, receivers, and engines. The ramifications of these accomplishments are assessed in the context of developmental objectives and strategies.

  7. FY2009 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, Mitchell [ORNL

    2009-11-01

    environment or as a complete propulsion system and whether the efficiency and performance targets at the vehicle level have been achieved. The research performed under this subprogram will help remove technical and cost barriers to enable the development of technology for use in such advanced vehicles as hybrid electric vehicles (HEVs), plug-in HEVs (PHEVs), all electric vehicles, and fuel-cell-powered automobiles that meet the goals of the Vehicle Technologies Program. A key element in making these advanced vehicles practical is providing an affordable electric traction drive system. This will require attaining weight, volume, and cost targets for the power electronics and electrical machines subsystems of the traction drive system. Areas of development include these: (1) novel traction motor designs that result in increased power density and lower cost; (2) inverter technologies involving new topologies to achieve higher efficiency, with the ability to accommodate higher-temperature environments while achieving high reliability; (3) converter concepts that employ means of reducing the component count and integrating functionality to decrease size, weight, and cost; (4) new onboard battery charging concepts that result in decreased cost and size; (5) more effective thermal control and packaging technologies; and (6) integrated motor/inverter concepts. ORNL's Power Electronics and Electric Machinery Research Center conducts fundamental research, evaluates hardware, and assists in the technical direction of the DOE Vehicle Technologies Program, APEEM subprogram. In this role, ORNL serves on the FreedomCAR Electrical and Electronics Technical Team, evaluates proposals for DOE, and lends its technological expertise to the direction of projects and evaluation of developing technologies. ORNL also executes specific projects for DOE. The following report discusses those projects carried out in FY 2009 and conveys highlights of their accomplishments. Numerous project reviews

  8. Cogeneration (hydrogen and electrical power) using the Texaco Gasification Power Systems (TGPS) technology

    International Nuclear Information System (INIS)

    Gardner, J.

    1994-01-01

    The information herein presents preliminary technical and cost data for an actual case study using Texaco Gasification Power Systems (TGPS) technology, incorporated as part of an overall refinery upgrade project. This study is based on gasification of asphalt and vacuum residue (see Table 1, feedstock properties) to produce hydrogen plus carbon monoxide (synthesis gas) for the ultimate production of high purity hydrogen and power at a major refinery in Eastern Europe. A hydrogen production of 101,000 Nm 3 /hr (9.1 tons/hr) at 99.9 (wt.%) purity plus 50 MW (net) power slated to be used by the refinery was considered for this study. Figure I shows a block diagram depicting the general refinery configuration upgrade as envisioned by the owner operator; included in the configuration as shown in the shaded area is the TGPS plant. Figure II shows a block flow diagram depicting the TGPS unit and its battery limits as defined for this project. The technology best suited to meet the demand for clean and efficient electric power generation and hydrogen production is the Texaco Gasification Power Systems (TGPS) process. This technology is based upon Texaco's proprietary gasification technology which is well proven with over 40 years of gasification experience. There are currently 37 operating units in the world today which have licensed the Texaco gasification process technology, with another 12 in design/construction. Total synthesis gas (hydrogen + carbon monoxide) production capacity is over 2,8 billion standard cubic feet per day. The TGPS, which is basically the Integrated Gasification Combined Cycle (IGCC) based upon the Texaco gasification technology, was developed by combining and integrating gasification with power generation facilities. (author). 3 figs., 9 tabs., 4 refs

  9. Energy and Environment. Electric power stock exchange

    International Nuclear Information System (INIS)

    Fazioli, R.; Antonioli, B.; Beccarello, M.; Da Rin, B.

    2000-01-01

    In this paper are reported the structural characteristics of electric power stock exchange in the processes liberalization of european electric markets. International experience are also considered [it

  10. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  11. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  12. On using PEMFC for Electrical Power Generation on More Electric Aircraft

    OpenAIRE

    Jenica Ileana Corcau; Liviu Dinca

    2012-01-01

    The electrical power systems of aircrafts have made serious progress in recent years because the aircrafts depend more and more on the electricity. There is a trend in the aircraft industry to replace hydraulic and pneumatic systems with electrical systems, achieving more comfort and monitoring features and enlarging the energetic efficiency. Thus, was born the concept More Electric Aircraft. In this paper is analyzed the integration of a fuel cell into the existing elect...

  13. Influence of wind power, plug-in electric vehicles, and heat storages on power system investments

    International Nuclear Information System (INIS)

    Kiviluoma, Juha; Meibom, Peter

    2010-01-01

    Due to rising fuel costs, the substantial price for CO 2 emissions and decreasing wind power costs, wind power might become the least expensive source of power for an increasing number of power systems. This poses the questions of how wind power might change optimal investments in other forms of power production and what kind of means could be used to increase power system flexibility in order to incorporate the variable power production from wind power in a cost-effective manner. We have analysed possible effects using an investment model that combines heat and power production and simulates electric vehicles. The model runs in an hourly time scale in order to accommodate the impact of variable power production from wind power. Electric vehicles store electricity for later use and can thus serve to increase the flexibility of the power system. Flexibility can also be upgraded by using heat storages with heat from heat pumps, electric heat boilers and combined heat and power (CHP) plants. Results show that there is great potential for additional power system flexibility in the production and use of heat. (author)

  14. Electric power annual 1994. Volume 2, Operational and financial data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-28

    This year, the annual is published in two volumes. Volume I focused on US electric utilities and contained final 1994 data on net generation, fossil fuel consumption, stocks, receipts, and cost. This Volume II presents annual 1994 summary statistics for the electric power industry, including information on both electric utilities and nonutility power producers. Included are preliminary data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold (based on form EIA-861) and for electric utility financial statistics, environmental statistics, power transactions, and demand- side management. Final 1994 data for US nonutility power producers on installed capacity and gross generation, as well as supply and disposition information, are also provided in Volume II. Technical notes and a glossary are included.

  15. MW-Class Electric Propulsion System Designs

    Science.gov (United States)

    LaPointe, Michael R.; Oleson, Steven; Pencil, Eric; Mercer, Carolyn; Distefano, Salvador

    2011-01-01

    Electric propulsion systems are well developed and have been in commercial use for several years. Ion and Hall thrusters have propelled robotic spacecraft to encounters with asteroids, the Moon, and minor planetary bodies within the solar system, while higher power systems are being considered to support even more demanding future space science and exploration missions. Such missions may include orbit raising and station-keeping for large platforms, robotic and human missions to near earth asteroids, cargo transport for sustained lunar or Mars exploration, and at very high-power, fast piloted missions to Mars and the outer planets. The Advanced In-Space Propulsion Project, High Efficiency Space Power Systems Project, and High Power Electric Propulsion Demonstration Project were established within the NASA Exploration Technology Development and Demonstration Program to develop and advance the fundamental technologies required for these long-range, future exploration missions. Under the auspices of the High Efficiency Space Power Systems Project, and supported by the Advanced In-Space Propulsion and High Power Electric Propulsion Projects, the COMPASS design team at the NASA Glenn Research Center performed multiple parametric design analyses to determine solar and nuclear electric power technology requirements for representative 300-kW class and pulsed and steady-state MW-class electric propulsion systems. This paper describes the results of the MW-class electric power and propulsion design analysis. Starting with the representative MW-class vehicle configurations, and using design reference missions bounded by launch dates, several power system technology improvements were introduced into the parametric COMPASS simulations to determine the potential system level benefits such technologies might provide. Those technologies providing quantitative system level benefits were then assessed for technical feasibility, cost, and time to develop. Key assumptions and primary

  16. Life cycle assessment for coordination development of nuclear power and electric vehicle

    International Nuclear Information System (INIS)

    Liu Hong; Wang Yingrong

    2010-01-01

    Energy, environment and climate change have become focus political topics. In this paper, the life cycle assessment for cooperation development of nuclear power and electric vehicle were analyzed from the view of energy efficiency and pollutant emissions. The assessment results show that the pathway of nuclear power coupled with electric vehicle is better than coal electric power coupled with electric vehicle and normal gasoline coupled with internal combustion engine powered vehicle in terms of the environmental and energy characteristics. To charge the electric vehicle, instead of water power station, can safeguard the stable operation of nuclear power station. The results could provide consulted for coordination development of nuclear power, electric vehicle and brain power electric net. (authors)

  17. Limiting electric fields of HVDC overhead power lines.

    Science.gov (United States)

    Leitgeb, N

    2014-05-01

    As a consequence of the increased use of renewable energy and the now long distances between energy generation and consumption, in Europe, electric power transfer by high-voltage (HV) direct current (DC) overhead power lines gains increasing importance. Thousands of kilometers of them are going to be built within the next years. However, existing guidelines and regulations do not yet contain recommendations to limit static electric fields, which are one of the most important criteria for HVDC overhead power lines in terms of tower design, span width and ground clearance. Based on theoretical and experimental data, in this article, static electric fields associated with adverse health effects are analysed and various criteria are derived for limiting static electric field strengths.

  18. French electric power balance sheet 2009

    International Nuclear Information System (INIS)

    Lartigau, Thierry; Riere, Alexia

    2010-01-01

    The mission of RTE, the French electricity Transportation grid, a public service assignment, is to balance the electricity supply and demand in real time. This report presents RTE's technical results for the year 2009: key figures of the French electricity consumption, lowering of the French power generation, decrease of trade balance at borders but still positive, continuation of RTE's investments for the improvement of the grid performance. New RTE's infrastructures, electricity quality data, and the evolution of market mechanisms are presented in appendixes

  19. Electric machinery and drives in thermal power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The following subjects were dealt with during the VDE meeting: 1) Requirements made by the electric network on the generators and their excitation equipment, and the influence thereof on their design; 2) requirements made by the power station process on the electric drives and the influence thereof on type and design; 3) requirements made on protective measures from the point of the electric power station machinery. (TK) [de

  20. Market power analysis for the Iranian electricity market

    International Nuclear Information System (INIS)

    Asgari, Mohammad Hossein; Monsef, Hassan

    2010-01-01

    The market power problem in Iranian electricity market is addressed in this study. This paper by using various structural indices of market power and reviewing market results analyzes the intensity of competition in Iran's electricity market and examines whether this market is functioning at an appropriate level of efficiency. In this article the most well-known indices of market power are calculated in two approaches for two different scenarios (current situation and future outlook of generation sector's ownership in Iran's power industry). Comparing the results of these scenarios promises more competitive market for the second scenario. Calculating Residual Supply Index for Iran's power market shows despite admissible values of concentration ratios, due to supply scarcity during periods when the demand is close to the total available capacity, some suppliers can exercise market power even with a relatively small market share. The most important price and load indices like weighted average prices and load/price duration curves of Iranian electricity market during March 2007-March 2008 are also analyzed in this paper. These results imply the existence of economic withholding. The main limiting factors of competition and significant implemented countermeasures for market power mitigation in Iran's electricity market are also mentioned.