WorldWideScience

Sample records for electric company project

  1. Hawaiian Electric Company Demand Response Roadmap Project

    Energy Technology Data Exchange (ETDEWEB)

    Levy, Roger [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-01-12

    The objective of this project was to develop a “roadmap” to guide the Hawaiian Electric Company (HECO) demand response (DR) planning and implementation in support of the Hawaii Clean Energy Initiative (HCEI) 70% clean energy goal by 2030.

  2. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  3. 75 FR 30021 - South Carolina Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference...

    Science.gov (United States)

    2010-05-28

    ... Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference With the National Marine... from Federal Energy Regulatory Commission (FERC) Headquarters, commencing at 2 p.m. (Eastern Standard... Project. The South Carolina Electric and Gas Company will also participate in the teleconference. All...

  4. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  5. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  6. Electric Holding Company Areas

    Data.gov (United States)

    Department of Homeland Security — Holding companies are electric power utilities that have a holding company structure. This vector polygon layer represents the area served by electric power holding...

  7. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  8. Potential Use of Communications and Project Management Systems in Remote Construction Projects: The Case of Saudi Electric Company

    Directory of Open Access Journals (Sweden)

    Bhzad Sidawi

    2012-01-01

    Full Text Available Remote projects have their unique problems that are caused mainly by the remoteness of the project itself thus the loose control over management. This is due to a number of reasons such as lack of human resources and infrastructure. Research studies that were undertaken worldwide - regarding this issue- has highlighted few unique management problems. The aim of this paper is to investigate how far the IT tools would help in managing remote construction projects in the Kingdom of Saudi Arabia (KSA. Due to the lack of previous research regarding remote projects within the Gulf region and the KSA, a pilot study was conducted in 2009 to define and test the wording of questions that are part of the main survey. The main survey was undertaken on Saudi Electric Company (SEC. The study found that IT systems and tools have the potential but this potential is hindered by a number of technical, managerial, staff factors. Therefore, successful application of IT systems would require changes to the present management settings at various levels. This would ensure that the SEC is capable of achieving the full benefit from using these advanced systems.

  9. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  10. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    International Nuclear Information System (INIS)

    Smith-Perera, Aida; Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual

    2010-01-01

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  11. Project of law modified by the Senate relative to the electric and gas public utilities and to the electric and gas companies

    International Nuclear Information System (INIS)

    2004-07-01

    This project of law aims to adapt the electricity and gas sector to the new economical context of opening of the energy markets to competition. It gives to energy companies the internal organization base necessary to warrant a high level of service and a transparent and non-discriminatory access of third parties to transport and distribution networks. These evolutions will allow Electricite de France (EdF) and Gaz de France (GdF) companies to compete on equal terms with their European competitors. It confirms first the prime role of public utility of both companies and then transposes the dispositions of the European directives relative to the organization of EdF and GdF integrated companies. It foresees the creation of two daughter companies for the management of energy transport activities. The project of law foresees also the change of the status of EdF and GdF companies and the reform of the retirement pensions of the personnel. This report presents the modifications added by the Senate to the text of law adopted at first reading by the House of Commons. (J.S.)

  12. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

    2008-02-01

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  13. 76 FR 24465 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-05-02

    ... Electric Company Notice of Application Tendered for Filing With the Commission and Establishing Procedural... Gas and Electric Company. e. Name of Project: Drum-Spaulding Project. f. Location: The west slope of..., Pacific Gas and Electric Company, P.O. Box 770000, San Francisco, CA 94177-0001, (415) 973-4481, or e-mail...

  14. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  15. The Electric Company Writers' Notebook.

    Science.gov (United States)

    Children's Television Workshop, New York, NY.

    This handbook outlines the curriculum objectives for the children's television program, "The Electric Company." The first portion of the text delineates strategies for teaching symbol/sound analysis, including units on blends, letter groups, and word structure. A second section addresses strategies for reading for meaning, including…

  16. Early site review report for the Sundesert site, San Diego Gas and Electric Company. Project No. 558

    International Nuclear Information System (INIS)

    1977-01-01

    The purpose of the report is to present the Nuclear Regulatory Commission's evaluation of several of the matters relating to the suitability of the Sundesert site near Blythe, California, on which the San Diego Gas and Electric Company proposes to build the Sundesert Nuclear Plant, Units 1 and 2. The report summarizes the results of the technical evaluation of the suitability of the proposed Sundesert site for a nuclear plant and delineates the scope of the technical matters considered in evaluating the suitability of the site

  17. Results of the scientific and humanitarian projects supported by the German electricity companies (VDEW e.V.) after the Chernobyl accident

    International Nuclear Information System (INIS)

    Pfob, H.; Heinemann, G.

    2000-01-01

    The German Electricity Companies, organized by VDEW e.V., tried to support in manifold ways the areas and people affected by the Chernobyl accident in their management of the situation. Apart from their prompting numerous help projects of the German public; we must mention three efforts especially: 1. the program for partnership in security matters initiated by the German nuclear power plants has been serving a quick and efficient support of the Eastern European plants since 1990- parallel to the efforts on a European level (strategic exchange of views of the experts concerned, consultation and training on the management level, optimization of training programs). 2: the project [Scientists Help Chernobyl Children] of the Joint Committee for Radiation Research (GAST), an union of the scientific societies working on radiation research in Germany under the chairmanship of Prof. Reiners (Essen/Wuerzburg) in cooperation with Prof. Streffer (Essen), Dr. Parezke (Munich), Dr. Heinemann (Hannover) and Dr. Pfob (Karlsruhe), aims to give humanitarian and scientific help for children ill with thyroid cancer in Belarus. Therapy and training, molecular biological examinations, dosimetry, and risk evaluation, as well as consultation and coordination in Minsk are parts of the project. 3: the project of the Radiation Cytogenetics Association (RCA) under the chairmanship of Prof. Bauchinger (GSF Muenchen) has been giving coordinated help with biological dosimetry to institutions and scientist in the states of the former USSR. Through retrospective biological dosimetry, especially the employment of the FISH (fluorescence in situ hybridization)-technology for the assessment of so-called stable translocations, both individual and population doses were analyzed. All three of these projects, even if to a different extent, have been leading to new and unique results up to the present day. Especially the GAST-project has been marked to a high extent by its humanitarian help for the

  18. Experience of electric power conservation in COELBA (Bahia Electric Company)

    International Nuclear Information System (INIS)

    Bastos, A.C.F.

    1990-01-01

    The electric power crisis of Brazilian north-east in 1987 imposes the Bahia Electric Company-COELBA to management a electric power conservation. The institutional, organizational and operational aspects are presented, including the tariff system, the market, the consumption and the relation with public. (author)

  19. Electric Company - Medium Voltage Substations

    OpenAIRE

    MacCosham, Spencer

    2014-01-01

    The capstone project goal was to recommend ways to increase sales of our client’s product by a factor of 10. The core of our project included researching and analyzing the client’s “Model III” package-unit-substations. Specifically, the project objectives were two-fold: First, we were to conduct market research and data analysis on package unit substations in North America. We needed to identify sales channels, competitors, potential substitutes, etc. Second, we were to identify market/channe...

  20. Memorial 1997 - ENDESA (Chilean Electricity Company)

    International Nuclear Information System (INIS)

    1998-01-01

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed

  1. MODERN ELECTRIC CARS OF TESLA MOTORS COMPANY

    OpenAIRE

    O. F. Vynakov; E. V. Savolova; A. I. Skrynnyk

    2016-01-01

    This overview article shows the advantages of a modern electric car as compared with internal combustion cars by the example of the electric vehicles of Tesla Motors Company. It (в смысле- статья) describes the history of this firm, provides technical and tactical characteristics of three modifications of electric vehicles produced by Tesla Motors. Modern electric cars are not less powerful than cars with combustion engines both in speed and acceleration amount. They are reliable, economical ...

  2. MODERN ELECTRIC CARS OF TESLA MOTORS COMPANY

    Directory of Open Access Journals (Sweden)

    O. F. Vynakov

    2016-08-01

    Full Text Available This overview article shows the advantages of a modern electric car as compared with internal combustion cars by the example of the electric vehicles of Tesla Motors Company. It (в смысле- статья describes the history of this firm, provides technical and tactical characteristics of three modifications of electric vehicles produced by Tesla Motors. Modern electric cars are not less powerful than cars with combustion engines both in speed and acceleration amount. They are reliable, economical and safe in operation. With every year the maximum range of an electric car is increasing and its battery charging time is decreasing.Solving the problem of environmental safety, the governments of most countries are trying to encourage people to switch to electric cars by creating subsidy programs, lending and abolition of taxation. Therefore, the advent of an electric vehicle in all major cities of the world is inevitable.

  3. 76 FR 61687 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2479-011-CA] Pacific Gas and Electric Company Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission...

  4. 76 FR 35208 - Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 2310-193--California; Project No. 2266-102--California] Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review On July 6-8, 2011, the Federal Energy Regulatory Commission (Commission) staff and the Pacific Gas and Electric Company ...

  5. Project of law relative to the electricity and gas public utilities and to the power and gas companies; Projet de loi relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This document is the definitive text of this project of law adopted by the French house of commons. The aim of this law is to allow the administrations to avoid to use their eligibility right with the opening of the electricity and gas markets to competition. It changes the juridical status of the two public utilities Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. (J.S.)

  6. Organizational Diagnosis in Project-Based Companies

    Directory of Open Access Journals (Sweden)

    Behrouz Zarei

    2014-05-01

    Full Text Available The purpose of this article is to develop a new method for corporate diagnosis (CD. To this end, a method is developed for the diagnosis process of project-based companies. The article presents a case study in a large company where data have been collected through focus groups. Project delay, high project cost, and low profitability are examples of project deficiency in project-based companies. Such issues have made managers pay special attention to find effective solutions to improve them. Prominent factors are inappropriate strategy, structure, system, human resource management, and PMBOK(Project Management Body of Knowledge processes. Thus, CD and analysis is an important task in improvement of corporate performance. The CD model that is developed in this article could be used for project-based companies. The proposed method can be used for CD in any project-based company. This article provides an emphatic application of CD as a prerequisite for restructuring in project-based companies.

  7. Electric utility companies and geothermal power

    Science.gov (United States)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  8. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  9. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1996-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  10. 78 FR 56594 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-09-13

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-76B, -85B, -90B, -94B, -110B1, and - 115B turbofan engines. This AD was...) Applicability This AD applies to General Electric Company (GE): (1) GE90-76B, -85B, -90B, and -94B turbofan...

  11. 78 FR 72552 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company model GEnx-2B67 and GEnx-2B67B turbofan engines. This AD was prompted by the... certain serial number General Electric Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines. The...

  12. Annual report 2000 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    2000-01-01

    The annual report of COPEL - Electrical Company of Parana State, Brazil, during the calendar year of 2003 is presented, comprising: a management report, portraying the Company's accomplishments during the year in connection with its core businesses and a social balance sheet, addressing the Company's efforts to contribute to the development and well-being of the community by means of socially oriented projects

  13. US company's new nuclear project progresses

    International Nuclear Information System (INIS)

    Archie, Jeffrey B.

    2011-01-01

    Operated by South Carolina Electric and Gas Company in the southeastern United States, V.C. Summer Nuclear Station has maintained a reputation of excellence for more than 25 years. The key to its success: placing safety as its first priority, keeping a keen focus on operations, establishing a culture of continuous learning, and embracing collaboration with industry peers. This philosophy guides its new nuclear project, which SCE and G has undertaken to meet the need for baseload generation in its service area in a manner that is clean, safe, reliable, and efficient. In the process, SCE and G is generating jobs and boosting the economy. Site preparation has been under way since 2009. SCE and G anticipates receiving its combined construction and operating license from the Nuclear Regulatory Commission, the independent, federal agency that oversees commercial nuclear power plants in the U.S., in late 2011 or early 2012, which will allow major construction to commence. The 2 new reactors are scheduled to begin commercial operation in 2016 and 2019, respectively, placing V.C. Summer at the forefront of a U.S. nuclear renaissance and carrying its legacy of excellence into the future. (orig.)

  14. 77 FR 4650 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-01-31

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... Compliance We estimate that this AD will affect 387 CF6-45 and CF6-50 series turbofan engines installed on...

  15. 78 FR 72567 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-110B1 and -115B turbofan engines. This AD was prompted by multiple... turbofan engines with variable bypass valve (VBV) actuator fuel supply tube, part number (P/N) 2165M22P01...

  16. 78 FR 19983 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability...-8E6, and CF34-8E6A1 turbofan engines, with an operability bleed valve (OBV) part number (P/N...

  17. 78 FR 76045 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-16

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... (AD) for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with certain high... turbofan engines with high pressure compressor (HPC) rotor stage 2-5 spools, part numbers (P/Ns) 351-103...

  18. 78 FR 38195 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-06-26

    ... Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT... all General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines. This emergency AD was.... owners and operators of these GE90-110B1 and GE90-115B turbofan engines. This action was prompted by...

  19. 78 FR 50320 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-19

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) model GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part number...-2B67 turbofan engine be removed from the Applicability section of this AD. The commenters noted that...

  20. 77 FR 3088 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-01-23

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-10E series turbofan engines. This AD was prompted by a report of heavy wear... turbofan engines installed on airplanes of U.S. registry. We also estimate that it will take about 8 work...

  1. Electricity Self-Generation Costs for Industrial Companies in Cameroon

    Directory of Open Access Journals (Sweden)

    Diboma Benjamin Salomon

    2010-07-01

    Full Text Available Industrial production in developing countries (DC is frequently perturbed by electric energy supply difficulties. To overcome this problem, generators are used in self-generation of energy, but this leads to an increase of electricity-related expenses. This article assesses the impact of electricity self-generation on Cameroonian industrial companies. The model described in this article is based on data collected through a survey of a representative sample of industrial companies and from numerous previous thematic and statistical studies. The results of our analyses show that expenses related to electricity in industrial companies in Cameroon have increased five times due to electricity rationing and untimely power cuts. The article also suggests some solutions to improve the electricity self-generation capacity of industrial companies.

  2. Industrial companies' demand for electricity. Evidence from a micropanel

    International Nuclear Information System (INIS)

    Bjoerner, T.B.; Togeby, M.; Jensen, H.H.

    2001-01-01

    The paper presents a micro-econometric analysis of industrial companies' demand for electricity. Previous studies on electricity consumption in the industrial sector have relied on aggregate data or cross-section observations. Here we present an econometric study on electricity demand based on a panel of 2949 Danish companies followed from 1983 to 1996. It is found that estimators of electricity demand that take account of the panel structure (fixed effect models) yield considerably lower price and production elasticities compared to estimators that do not (like cross-section models). It is also investigated how various company characteristics like size, type of industrial sub-sector and electricity intensity in production influence price and production elasticities. It appears that companies with a high electricity intensity also have a high own-price elasticity

  3. 78 FR 72877 - Arkansas Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint

    Science.gov (United States)

    2013-12-04

    ... Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint Take notice that on November... Commission (Commission), 18 CFR 385.206, Arkansas Electric Corporation (Complainant) filed a formal complaint against Oklahoma Gas and Electric Company (Respondents), alleging that the Respondent's Production Formula...

  4. Electric scooter pilot project

    Science.gov (United States)

    Slanina, Zdenek; Dedek, Jan; Golembiovsky, Matej

    2016-09-01

    This article describes the issue of electric scooter development for educational and demonstration purposes on the Technical University of Ostrava. Electric scooter is equipped with a brushless motor with permanent magnets and engine controller, measuring and monitoring system for speed regulation, energy flow control and both online and off-line data analysis, visualization system for real-time diagnostics and battery management with balancing modules system. Implemented device brings a wide area for the following scientific research. This article also includes some initial test results and electric vehicles experiences.

  5. Project of law modified by the Senate relative to the electric and gas public utilities and to the electric and gas companies; Projet de loi modifie par le Senat relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This project of law aims to adapt the electricity and gas sector to the new economical context of opening of the energy markets to competition. It gives to energy companies the internal organization base necessary to warrant a high level of service and a transparent and non-discriminatory access of third parties to transport and distribution networks. These evolutions will allow Electricite de France (EdF) and Gaz de France (GdF) companies to compete on equal terms with their European competitors. It confirms first the prime role of public utility of both companies and then transposes the dispositions of the European directives relative to the organization of EdF and GdF integrated companies. It foresees the creation of two daughter companies for the management of energy transport activities. The project of law foresees also the change of the status of EdF and GdF companies and the reform of the retirement pensions of the personnel. This report presents the modifications added by the Senate to the text of law adopted at first reading by the House of Commons. (J.S.)

  6. Project Management Software for Distributed Industrial Companies

    Science.gov (United States)

    Dobrojević, M.; Medjo, B.; Rakin, M.; Sedmak, A.

    This paper gives an overview of the development of a new software solution for project management, intended mainly to use in industrial environment. The main concern of the proposed solution is application in everyday engineering practice in various, mainly distributed industrial companies. Having this in mind, special care has been devoted to development of appropriate tools for tracking, storing and analysis of the information about the project, and in-time delivering to the right team members or other responsible persons. The proposed solution is Internet-based and uses LAMP/WAMP (Linux or Windows - Apache - MySQL - PHP) platform, because of its stability, versatility, open source technology and simple maintenance. Modular structure of the software makes it easy for customization according to client specific needs, with a very short implementation period. Its main advantages are simple usage, quick implementation, easy system maintenance, short training and only basic computer skills needed for operators.

  7. 76 FR 28023 - Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2232-522; Project No. 516-459] Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings On March 18, 2011, the National Marine Fisheries Service (NMFS) requested a meeting with Duke Energy Carolinas, LLC...

  8. Dynamic Capabilities and Project Management in Small Software Companies

    DEFF Research Database (Denmark)

    Nørbjerg, Jacob; Nielsen, Peter Axel; Persson, John Stouby

    2017-01-01

    A small software company depends on its capability to adapt to rapid technological and other changes in its environment—its dynamic capabilities. In this paper, we argue that to evolve and maintain its dynamic capabilities a small software company must pay attention to the interaction between...... dynamic capabilities at different levels of the company — particularly between the project management and the company levels. We present a case study of a small software company and show how successful dynamic capabilities at the company level can affect project management in small software companies...

  9. LOGISTICS ASPECTS OF PRACTICAL MARKETING IN ELECTRICITY COMPANY

    OpenAIRE

    Ewa Moroz

    2008-01-01

    An anonymous questionnaire was presented to employees of an electricity distribution company - Enion Grupa Tauron S.A. – Department Czestochowa. The research, in the part presented in this paper, referred to company-customer relations and to an influence that those relations have on costs and quality of work in the company, mainly in the aspect of employees’ understanding of those connections. In the paper author states the conclusion that suggests implementation of Lean Thinking procedures i...

  10. 77 FR 48110 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-08-13

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... certain General Electric Company (GE) CF6-80C2 series turbofan engines. The existing AD requires... 2000-04-14, Amendment 39-11597 (65 FR 10698, February 29, 2000), for all GE CF6-80C2 series turbofan...

  11. 78 FR 44899 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-07-25

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-110B1 and -115B turbofan engines. This proposed AD was prompted by multiple...) 2165M22P01, installed on GE90-110B1 and -115B turbofan engines. One of the leaks led to an under cowl engine...

  12. 76 FR 64844 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2011-10-19

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... series turbofan engines with certain LPT rotor stage 3 disks installed. That AD requires initial and...

  13. 78 FR 19628 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-02

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-76B, -85B, -90B, -94B, - 110B1, and -115B turbofan engines. This proposed AD was... of stage 1 HPT stator shroud distress resulting in engine removals on airplanes with GE90 turbofan...

  14. 77 FR 76977 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-12-31

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Supplemental notice... proposed airworthiness directive (AD) for certain General Electric Company (GE) CF6-80C2 series turbofan... part 39 to include an AD that would apply to certain GE CF6-80C2 series turbofan engines. That NPRM...

  15. 78 FR 47534 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-06

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... directive (AD) 2013-14-51 for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with... all known U.S. owners and operators of GE90-110B1 and GE90-115B turbofan engines. AD 2013-14-51...

  16. 78 FR 24671 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-26

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... certain General Electric Company (GE) CF6-80C2 series turbofan engines. That AD currently requires.../B1F/B2F/B4F/B6F/B7F/D1F turbofan engines with any of the following installed: (1) Fuel tube, part...

  17. 78 FR 43197 - Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando...

    Science.gov (United States)

    2013-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ER13-1922-000; ER13-1929-000; ER13-1932-000; NJ13-11-000] Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando Utilities Commission; Notice of Compliance Filings Take notice that on July 10, 2013, Duke Energy...

  18. Design of investment management optimization system for power grid companies under new electricity reform

    Science.gov (United States)

    Yang, Chunhui; Su, Zhixiong; Wang, Xin; Liu, Yang; Qi, Yongwei

    2017-03-01

    The new normalization of the economic situation and the implementation of a new round of electric power system reform put forward higher requirements to the daily operation of power grid companies. As an important day-to-day operation of power grid companies, investment management is directly related to the promotion of the company's operating efficiency and management level. In this context, the establishment of power grid company investment management optimization system will help to improve the level of investment management and control the company, which is of great significance for power gird companies to adapt to market environment changing as soon as possible and meet the policy environment requirements. Therefore, the purpose of this paper is to construct the investment management optimization system of power grid companies, which includes investment management system, investment process control system, investment structure optimization system, and investment project evaluation system and investment management information platform support system.

  19. Projecting Electricity Demand in 2050

    Energy Technology Data Exchange (ETDEWEB)

    Hostick, Donna J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Belzer, David B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Markel, Tony [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kintner-Meyer, Michael C. W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-07-01

    This paper describes the development of end-use electricity projections and load curves that were developed for the Renewable Electricity (RE) Futures Study (hereafter RE Futures), which explored the prospect of higher percentages (30% - 90%) of total electricity generation that could be supplied by renewable sources in the United States. As input to RE Futures, two projections of electricity demand were produced representing reasonable upper and lower bounds of electricity demand out to 2050. The electric sector models used in RE Futures required underlying load profiles, so RE Futures also produced load profile data in two formats: 8760 hourly data for the year 2050 for the GridView model, and in 2-year increments for 17 time slices as input to the Regional Energy Deployment System (ReEDS) model. The process for developing demand projections and load profiles involved three steps: discussion regarding the scenario approach and general assumptions, literature reviews to determine readily available data, and development of the demand curves and load profiles.

  20. Evaluation of efficiency in Japan electric power companies

    International Nuclear Information System (INIS)

    Ghaderi, F.; Muyajima, M.

    2001-01-01

    Achieving energy efficiency also must consider supply efficiency, how much energy it takes to generate electricity and transmit it to the end user. system efficiency reflects the loss of energy during the processes of generation, transmission and distribution of electricity. Of the millions of tons of coal that are burned to produce heat in generation of electricity every year, only one third is converted into electricity.The electric power plant immediately uses 5 to 10 percent of that energy for use in the plant. Around another 10 percent of this energy is consumed in the transmission and distribution of electric energy to end users. Overall,more that 70 percent of the energy used to produce and deliver electricity never gets to the end user. The costs of this wasted energy are reflected in the customer's electricity bill. Furthermore, once delivered, users of electricity are subjected to more h idden c osts the demand charge which reflects the rate at which consumers draw energy from the power plant during a particular time of day, are also affected by the time of year. This additional charge c n be dramatic. For example, the cost for using electric air conditioning at the w rong t ime of the day , are also affected by the time of year. This additional charge can be dramatic. For example, the cost for using electric air conditioning at the wrong time of the day could be as much as 25 to 40 percent higher than what a facility normally pays for electricity during off-peak times. Minimizing the costs of operations, therefor, is a must for all electric companies. In the other hand utility rates, such as the cost of electricity, are a necessary element of operating in all enterprises.In some industries the payment over electricity make a large percentage of their total expenses, but that doesn't mean that every effort should not be made to reduce their impact on the bottom line, it should be considered that a very small change in operating procedure can change

  1. The projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2010-10-01

    This paper describes the outcomes from the joint report between the Nuclear Energy Agency and the International Energy Agency of the OECD on the projected costs of generating electricity. The study contains data on electricity generating costs for almost 200 power plants provided by 17 OECD member countries, 4 non-OECD countries and 4 industrial companies or industry organisations. The paper presents the projected costs of generating electricity calculated according to common methodological rules on the basis of the data provided by participating countries and organisations. Data were received for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. Cost estimates were also provided for combined heat and power plants, as well as for coal plants that include carbon capture. As in previous studies of the same series, all costs and benefits were discounted or capitalised to the date of commissioning in order to calculate the state of the electricity costs per MWh, based on plant operating lifetime data. In addition, the paper contains a discussion of a number of factors affecting the cost of capital, the outlook for carbon capture and storage and the working of electricity markets. (Author)

  2. Requirements management at Westinghouse Electric Company

    International Nuclear Information System (INIS)

    Gustavsson, Henrik

    2014-01-01

    Field studies and surveys made in various industry branches support the Westinghouse opinion that qualitative systems engineering and requirements management have a high value in the development of complex systems and products. Two key issues causing overspending and schedule delays in projects are underestimation of complexity and misunderstandings between the different sub-project teams. These issues often arise when a project jumps too early into detail design. Good requirements management practice before detail design helps the project teams avoid such issues. Westinghouse therefore puts great effort into requirements management. The requirements management methodology at Westinghouse rests primarily on four key cornerstones: 1 - Iterative team work when developing requirements specifications, 2 - Id number tags on requirements, 3 - Robust change routine, and 4 - Requirements Traceability Matrix. (authors)

  3. Explaining the inefficiency of electrical distribution companies. Peruvian firms

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Reyes, Raul [Organismo Supervisor de la Inversion en Energia y Mineria, OSINERGMIN (Peru); Tovar, Beatriz [Infrastructure and Transport Research Group (EIT), Department of Applied Economics, University of Palmas de Gran Canaria (Spain)

    2010-09-15

    This paper investigates the extent to which the structural reform of the Peruvian electricity market, implemented in the 1990s, has improved the efficiency of the distribution companies; and it evaluates the influence on efficiency of firm specific explanatory variables. To do this, we rely on data from 14 distribution companies between 1996 and 2006. The results indicate that the incentives generated by the reform process led to the firms becoming more efficient. Moreover, the time trend and private management of the distribution companies are variables that positively affect the levels of efficiency, whereas the lower network densities are then the greater the inefficiency. (author)

  4. Explaining the inefficiency of electrical distribution companies. Peruvian firms

    International Nuclear Information System (INIS)

    Perez-Reyes, Raul; Tovar, Beatriz

    2010-01-01

    This paper investigates the extent to which the structural reform of the Peruvian electricity market, implemented in the 1990s, has improved the efficiency of the distribution companies; and it evaluates the influence on efficiency of firm specific explanatory variables. To do this, we rely on data from 14 distribution companies between 1996 and 2006. The results indicate that the incentives generated by the reform process led to the firms becoming more efficient. Moreover, the time trend and private management of the distribution companies are variables that positively affect the levels of efficiency, whereas the lower network densities are then the greater the inefficiency. (author)

  5. Evaluation of Public Service Electric & Gas Company`s standard offer program, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.A.; Kito, M.S.; Moezzi, M.M.

    1995-07-01

    In May 1993, Public Service Electric and Gas (PSE&G), the largest investor-owned utility in New Jersey, initiated the Standard Offer program, an innovative approach to acquiring demand-side management (DSM) resources. In this program, PSE&G offers longterm contracts with standard terms and conditions to project sponsors, either customers or third-party energy service companies (ESCOs), on a first-come, first-serve basis to fill a resource block. The design includes posted, time-differentiated prices which are paid for energy savings that will be verified over the contract term (5, 10, or 15 years) based on a statewide measurement and verification (M&V) protocol. The design of the Standard Offer differs significantly from DSM bidding programs in several respects. The eligibility requirements and posted prices allow ESCOs and other energy service providers to market and develop projects among customers with few constraints on acceptable end use efficiency technologies. In contrast, in DSM bidding, ESCOs typically submit bids without final commitments from customers and the utility selects a limited number of winning bidders who often agree to deliver a pre-specified mix of savings from various end uses in targeted markets. The major objectives of the LBNL evaluation were to assess market response and customer satisfaction; analyze program costs and cost-effectiveness; review and evaluate the utility`s administration and delivery of the program; examine the role of PSE&G`s energy services subsidiary (PSCRC) in the program and the effect of its involvement on the development of the energy services industry in New Jersey; and discuss the potential applicability of the Standard Offer concept given current trends in the electricity industry (i.e., increasing competition and the prospect of industry restructuring).

  6. Organisational Memories in Project-Based Companies: An Autopoietic View

    Science.gov (United States)

    Koskinen, Kaj U.

    2010-01-01

    Purpose: The purpose of this paper is to describe project-based companies' knowledge production and memory development with the help of autopoietic epistemology. Design/methodology/approach: The discussion first defines the concept of a project-based company. Then the discussion deals with the two epistemological assumptions, namely cognitivist…

  7. Research on service strategy of electricity selling company under the reform of electricity market

    Science.gov (United States)

    Long, Zhuhan; Meng, Shiyu; Dou, Jinyue; Zeng, Ming; Sun, Chenjun

    2017-10-01

    The opening of the sale side of electricity market is an important goal of the new round of power system reform in China, and it is necessary to speed up the establishment and development of the electricity selling companies to achieve this goal. First of all, this paper defines the key problems, which are needed to be solved in the establishment of the sale side market, such as demand side response, optimization of users' power consumption mode, profit mode of electricity selling companies and fair competition in the market. On this basis, this paper analyzes the business of electricity selling company, from the aspects of the transition of business ideas, improving the energy efficiency level, providing integrated energy solutions and innovating business management mode; and then, the service strategies of electricity selling companies are put forward.

  8. 77 FR 58471 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-09-21

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA.../P1, GEnx-1B75/P1, GEnx- 2B67, and GEnx-2B67B turbofan engines. This AD requires initial and... this AD will affect 11 GE GEnx turbofan engines installed on airplanes of U.S. registry. We also...

  9. The development strategies of the european electric power companies

    International Nuclear Information System (INIS)

    Heddebaud, D.

    2005-01-01

    This study takes stock on the european market of the electric power and of its development perspectives. It details the strategy and the place of the main operators and shows their forces and weaknesses. It provides a comparison of the financial performances of 28 companies (growth, margins, profitability, debt and war chest). (A.L.B.)

  10. Battery Electric Vehicles: characteristics and research projects

    NARCIS (Netherlands)

    Besselink, I.J.M.

    2010-01-01

    This presentation discusses briefly the history of the electric car and its main characteristics. Two projects introduced: the battery electric VW Lupo EL and URE05e electric Formula Student racecar. Presentation slides.

  11. 75 FR 26743 - Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To...

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12779-005] Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To Discuss Information and Monitoring Needs for a License Application for a Pilot Project May 5, 2010. a. Type of Application: Draft Pilot License Application. b. Project N...

  12. Memorial 1997 - ENDESA (Chilean Electricity Company); ENDESA - Memoria 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-31

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed 35 figs., 115 tabs.

  13. Projected Costs of Generating Electricity

    International Nuclear Information System (INIS)

    Plante, J.

    1998-01-01

    Every 3 to 4 years, the NEA undertakes a study on projected costs of generating electricity in OECD countries. This started in 1983 and the last study (1997) has just be completed. All together 5 studies were performed, the first three dealing with nuclear and coal options, while the 1992 and 1997 included also the gas option. The goal of the study is to compare, country by country, generating costs of nuclear, coal-fired and gas-fired power plants that could be commissioned in the respondent countries by 2005-2010

  14. Federated product data management in multi company projects

    NARCIS (Netherlands)

    Pels, H.J.; Elmaraghy, H.A.; Elmaraghy, W.H.

    2005-01-01

    An approach for enabling concurrent engineering between companies by providing a proper collaboration platform, as developed in the VIDOP project is proposed. Apart from security, information status is an important element of trust. However, status-coding schemes differ much between companies and

  15. Projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.

    2010-01-01

    This paper describes the outcomes of a study on the projected costs of generating electricity. It presents the latest data available on electricity generating costs for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. The study reaches 2 key conclusions. First, at a 5% real interest rate, nuclear energy is the most competitive solution for base-load electricity generation followed by coal-fired plants without carbon capture and natural gas-fired combined plants. It should be noted that coal with carbon capture has not reached a commercial phase. Second, at a 10% interest rate, nuclear remains the most competitive in Asia and North America but in Europe, coal without carbon capture equipment, followed by coal with carbon capture equipment, and gas-fired combined cycle turbines are overall more competitive than nuclear energy. The results highlight the paramount importance of interest rates (this dependence is a direct consequence of the nuclear energy's high capital costs) and of the carbon price. For instance if we assume a 10% interest rate and a cost of 50 dollar per tonne of CO 2 , nuclear energy would become competitive against both coal and gas. (A.C.)

  16. Smart Grid Innovation Management for SME Electricity Companies

    DEFF Research Database (Denmark)

    Tambo, Torben

    2011-01-01

    innovation process lies ahead for utility companies in screening, testing, maturing, implementing and operating smart grids. This process is expected to follow the political targets for CO2 reduction stretching forward until 2050. As no proven concepts exists, and as the process is expected to progress many...... years ahead, smart grid represents an excellent case of continuous innovation. The current study use a series of loosely related technological studies of smart grid related technologies in SME electricity companies to highlight critical issues in this innovation process. Major findings...... are that the companies have limited innovation capabilities, they are presented with plenty of technological offerings that eventually have to be rejected, and they suffer from absence of clear objectives....

  17. Projected costs of generating electricity

    International Nuclear Information System (INIS)

    2005-01-01

    Previous editions of Projected Costs of Generating Electricity have served as the reference in this field for energy policy makers, electricity system analysts and energy economists. The study is particularly timely in the light of current discussions of energy policy in many countries. The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today and considered by participating countries as candidates for commissioning by 2010-2015 or earlier. Investors and other decision makers will also need to take the full range of other factors into account (such as security of supply, risks and carbon emissions) when selecting an electricity generation technology. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut ''winner''. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. An appendix to the report provides country statements on generation technologies and costs. Previous studies in the series were published in 1983, 1986, 1990, 1993 and 1998. (author)

  18. Own power: Motives of having electricity without the energy company

    International Nuclear Information System (INIS)

    Leenheer, Jorna; Nooij, Michiel de; Sheikh, Omer

    2011-01-01

    New technologies will enable households to generate an increasing amount of their own electricity. Intentions to generate own power are a preliminary step towards actual behavior. Because own generation is still very limited and the behavior of early adopters may not be representative for the complete population, our study focuses on intentions rather than actual behavior. A consumer survey among 2047 Dutch households reveals that environmental concerns are the most important driver of a household's intention to generate its own power. Affinity with technology and energy and the reputation of electricity companies are also significant drivers, but financial factors and power outages are not. About 40% of Dutch households have an intention to generate their own power, with an overrepresentation of young households. This group falls apart in two sub segments; for the 'generating savers' (21%) a high intention to generate own power coincides with a high intention to save energy, whereas generating users (18%) combine a high intention to generate own power with a low intention to save energy. - Highlights: → A consumer survey studies household intentions to generate own power. → Environmental concerns are the most important motive for generating own power. → Other drivers are affinity with technology and reputation of electricity companies. → About 40% of Dutch households feel a need to generate their own electricity.

  19. Managing IT Projects in Public Companies: A Case Study

    Directory of Open Access Journals (Sweden)

    Bouras, A.

    2014-07-01

    Full Text Available As part of its public sector modernization effort, a North African government has put a lot of effort and allocated significant budgets since 1997 to modernize one of its main public sector companies. Consequently, this company, that mainly offers postal services, initiated many IT-based projects to computerize all paper-based ongoing services offered through its branches and to present new products to customers. This company was aiming to improve service quality and to diversify the range of its services. However, some of these IT-based projects inevitably faced problems. Some projects were either not completed successfully, cancelled, over-budget or taking more time than scheduled. As a result, many employees and customers of this company were dissatisfied and complained about bad planning, slowness and significant disruptions in these projects, an event that affected adversely the quality of service. This study aims at determining the causes of these project disruptions, failures or delays. To achieve this aim, 30 experienced project developers and engineers working in that company’s IT department volunteered to respond to a detailed questionnaire specifically developed for this purpose. The questionnaire included questions about project vision clarity, time/cost management, project quality assurance, risk management and human resources management. Results show that the main reasons for disruptions, failure or delays in IT projects are lack of business plan and poor documentation during and after finishing projects, lack of clear quality assurance criteria, standards and reviews, and poor project risk management practices. Ramifications of such results in terms of improving IT project management practices in the public service sector are finally presented.

  20. RETRAN experience with BWR transients at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Ansari, A.A.F.; Cronin, J.T.; Slifer, B.C.

    1981-01-01

    Yankee Atomic Electric Company is actively involved in the development of licensing methods for BWR's. The computer code chosen for analyzing system response under transient conditions is RETRAN. This paper describes the RETRAN model developed for Vermont Yankee, and the results of the RETRAN checkout and qualification that has been achieved at YAEC through comparison of RETRAN predictions to the startup test results performed at the plant as part of the 100% power startup test program. In addition, abnormal operational transients typically analyzed for licensing are also presented

  1. Efficiency and regulation of the Slovenian electricity distribution companies

    International Nuclear Information System (INIS)

    Filippini, Massimo; Hrovatin, Nevenka; Zoric, Jelena

    2004-01-01

    The Slovenian Energy Law, adopted in 1999, has opened the internal market to competition up to 64% of the final consumption. The opening of the internal market to foreign competition is envisaged for 2003. With regard to the methodology of price regulation, the Energy Law introduces the 'price-cap' regulation, which aims to give firms incentive for cost reduction. To provide information for effective price regulation, we estimated a cost frontier function on a sample of Slovenian electricity distribution utilities over the 1991-2000 period. The estimated efficient frontier could be used by Slovenian regulatory agency as a benchmark to regulate network access prices. Our results show that Slovenian distribution companies are cost inefficient. We have also proved the presence of increasing returns to scale with most utilities not achieving the minimum efficient scale. Thus, the Slovenian regulatory authority should consider how to induce mergers of small electricity distribution utilities into larger units

  2. Sale of electric energy: the case of Electric Power Company of Santa Catarina State (CELESC)

    International Nuclear Information System (INIS)

    Aurich, D.S.

    1990-01-01

    An electric power system assuring the electric supply to the investor client was developed by CELESC, linking the sale resources to one generation construction. It was related the cost of enlargement work from Pery plant, with the participation of Manville Forest Products in the investments. The economic aspects of this contract are presented, including the supply assure, the costs and the advantage each company will receive. (C.G.C.)

  3. Fuel cells and electricity companies - new risk management opportunities

    International Nuclear Information System (INIS)

    Whale, M.

    2004-01-01

    'Full text:' Deregulation, distributed generation, combined heat and power, renewables, fuel cells, hydrogen. Power companies are facing a rapidly evolving environment that is testing their ability to effectively deploy capital and earn profits. While recent deregulation trends have shifted the structure of power markets into separating generators from distributors, the improving economic value proposition offered by smaller scale distributed generation technologies - such as fuel cells - would seem to be a conflicting development. In this complex and changing environment, decisions based on the economic reality of the capital markets are likely to prevail. By examining the opportunity to enhance risk management offered by stationary fuel cells, particularly in CHP applications, we provide a context for the issues being discussed in today's sessions focusing on power companies and electric utilities. Our risk management perspective suggests a pathway for implementing fuel cells in combined heat and power applications that large power generators can introduce in increasingly smaller sizes. With capital costs of fuel cells high and risk tolerance of power companies low, the challenge for smaller technology developers will be to reduce the apparently long time horizon that persists for substantial deployment. (author)

  4. The OMEGA Project: Open Market Energy Generation Allocation in deregulated electricity markets

    International Nuclear Information System (INIS)

    Contreras, J.; Conejo, A.J.

    2002-01-01

    The OMEGA project is part of the 5th Framework Programme for R and D that the European Union has started in the year 2000. It is a highly complex and interdisciplinary project, with five countries and several companies involved. The project aims at developing a decision support system for electricity producers to support energy management and energy trading groups within these companies in the commercial activities on open and competitive electricity markets using an e-commerce framework. This paper presents the OMEGA project, describes the objectives pursued, evaluates the project workplan, shows the complex project management structure, highlights the management problems, and presents relevant conclusions. (author)

  5. The OMEGA Project: Open Market Energy Generation Allocation in deregulated electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Contreras, J. [Universidad de Castilla-La Mancha, (Spain). Project Management Group, Escuela Tecnica Superior de Ingenieros Industriales; Conejo, A.J. [Universidad de Castilla-La Mancha, (Spain). Power Engineering Group, Escuela Tecnica Superior de Ingenieros Industriales

    2002-08-01

    The OMEGA project is part of the 5th Framework Programme for R and D that the European Union has started in the year 2000. It is a highly complex and interdisciplinary project, with five countries and several companies involved. The project aims at developing a decision support system for electricity producers to support energy management and energy trading groups within these companies in the commercial activities on open and competitive electricity markets using an e-commerce framework. This paper presents the OMEGA project, describes the objectives pursued, evaluates the project workplan, shows the complex project management structure, highlights the management problems, and presents relevant conclusions. (author)

  6. Resolution 147/012. It authorize the Central Libertador / SA aeolian generation company to generate an aeolian electricity source by an electric power generating plant located in Maldonado town 4 AA Catastral section, and the Sistema inerconectado Nacional connection

    International Nuclear Information System (INIS)

    2012-01-01

    This decree authorizes the generation of electricity using aeolian energy as the primary electricity source. This project was presented by the 'Libertador / S.A' aeolian generation company with the proposal to install an electrical plant in Maldonado town. This authorization is according to the Electric Wholesale Market regulation

  7. 75 FR 54618 - CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-09-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-000] CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Complaint...

  8. 75 FR 66744 - Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-10-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-001] Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Amended...

  9. 1-MWp electrical photovoltaic plant (EPHOP - project)

    International Nuclear Information System (INIS)

    Vitanov, P.; Toneva, A.; Petkanchin, L.; Ivancheva, J.; Neshev, S.

    2000-01-01

    The presented project concerns the realization of a grid connected 1-MW p pilot photovoltaic plant on the territory of Bulgaria.The purpose of the project is to demonstrate and prove solar energy advantages. A special attention will be paid to the possibility the generated electricity to join the national electric network. The site selection according to the meteorological conditions as well as general aspects of the project are discussed

  10. 78 FR 77114 - Pacific Gas and Electric Company: Notice of Application Accepted for Filing, Soliciting Comments...

    Science.gov (United States)

    2013-12-20

    ... Company (licensee). e. Name of Projects: Potter Valley Project. f. Location: Eel River and East Fork... Company, Mail Code: N11C P.O. Box 770000 San Francisco, CA 94177. Phone (415) 973-3076. i. FERC Contact...

  11. Models and strategies for electricity distribution companies in emerging economies

    Science.gov (United States)

    Zaragocin Espinosa, Leonardo Vicente

    Unbundling and privatization have become key elements of restructuring in the Electric Power Industry of Emerging Economies. These processes have concentrated on the Generation and Transmission areas, leaving Distribution as lower priority. Based on a comparison between the old role of Distribution Companies (DISCOS) and its new potential role this study identifies the main issues and challenges that DISCOS will face in the new environment once structural and ownership changes are completed. For the specific case of DISCOS in Emerging Economies, regulatory policies are reviewed and strategies identified in order to facilitate the transition and to assist in the integration of DISCOS with other agents in the evolving electric power market. Of particular importance in this research is the analysis of the role of Energy Efficiency (EE) in the new structural and governance environment. A theoretical study of the effects of energy efficiency measures, specifically loss reduction, on price regulation is developed within a proposed regulatory regime of privatization together with Price-Cap Regulation. This theoretical benchmark is then used as a starting point for a case study, the Electric System of Ecuador, where an analysis of the current Ecuadorian price regulation scheme (the Distribution Value Added Charge, VAD, scheme) is presented and analyzed in detail. General recommendations for improving the application of the VAD pricing approach are advanced, with special reference to the current situation in Ecuador.

  12. A comparison of electric vehicle integration projects

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Garcia-Valle, Rodrigo; Kempton, Willett

    2012-01-01

    .g. utilization of electric vehicles for ancillary services. To arrive at standardized solutions, it is helpful to analyze the market integration and utilization concepts, architectures and technologies used in a set of state-of-the art electric vehicle demonstration projects. The goal of this paper......It is widely agreed that an intelligent integration of electric vehicles can yield benefits for electric vehicle owner, power grid, and the society as a whole. Numerous electric vehicle utilization concepts have been investigated ranging from the simple e.g. delayed charging to the more advanced e...... is to highlight different approaches to electric vehicle integration in three such projects and describe the underlying technical components which should be harmonized to support interoperability and a broad set of utilization concepts. The projects investigated are the American University of Delaware's V2G...

  13. Tool for the control management of electric and magnetic fields of electrical companies

    International Nuclear Information System (INIS)

    Arnera, Patricia; Barbieri, Beatriz

    2008-01-01

    The use of electricity involves a wide range of activities that, because of its diversity, characteristics and relative importance causes different environmental impacts during the extraction, processing, transport and consuming activities. It is the role of the government to elaborate the rules for the incorporation of environmental aspects in the different segments of the market for different electrical energy sources and in all the stages of the process, from the initial evaluation to the construction and exploitation phases. Among the environmental key aspects to considerate, are the electric and magnetic fields, in which society has taken special interest as they are believed to be involved in health hazard. The faculties of the regulatory authority are dictate regulations and technique procedures to be fulfilled by the agents, and check their compliance. In the course of time since the mentioned obligations, the authority has gathered information regarding electric and magnetic fields that includes those planned in the Companies Environmental Planning and those obtained ad-hoc in the role of controller. In order to systematize this information, a data base has been designed considering different types of electric installations, the company which they belong to, equipment used in the measurements, representative layouts with measure points and profiles of the electric and magnetic fields that were obtained. (author)

  14. Tool for the control management of electric and magnetic fields of electrical companies

    Energy Technology Data Exchange (ETDEWEB)

    Arnera, Patricia; Barbieri, Beatriz [La Plata Univ. Nacional (Argentina). Facultad de Ingenieria, Instituto de Investigaciones Tecnologicas para Redes y Equipos; Turco, Joaquin; Messina, Juan; Postiglioni, Osvaldo [Ente Nacional Regulador de la Electricidad, Buenos Aires (Argentina)

    2008-07-01

    The use of electricity involves a wide range of activities that, because of its diversity, characteristics and relative importance causes different environmental impacts during the extraction, processing, transport and consuming activities. It is the role of the government to elaborate the rules for the incorporation of environmental aspects in the different segments of the market for different electrical energy sources and in all the stages of the process, from the initial evaluation to the construction and exploitation phases. Among the environmental key aspects to considerate, are the electric and magnetic fields, in which society has taken special interest as they are believed to be involved in health hazard. The faculties of the regulatory authority are dictate regulations and technique procedures to be fulfilled by the agents, and check their compliance. In the course of time since the mentioned obligations, the authority has gathered information regarding electric and magnetic fields that includes those planned in the Companies Environmental Planning and those obtained ad-hoc in the role of controller. In order to systematize this information, a data base has been designed considering different types of electric installations, the company which they belong to, equipment used in the measurements, representative layouts with measure points and profiles of the electric and magnetic fields that were obtained. (author)

  15. Flinders University Electric Vehicle Project

    Science.gov (United States)

    Atkinson, D. A.

    1973-01-01

    Outlines the specifications and principles involved in the operation of an electric car developed by the Institute of Solar and Electochemical Energy Conversion at Flinders University in South Australia. (JR)

  16. Lost in transition? Comparing strategies of electricity companies in Delhi

    International Nuclear Information System (INIS)

    Criqui, Laure; Zérah, Marie-Hélène

    2015-01-01

    This paper examines the notion of energy transition when implemented by private utilities. In 2000, the Delhi government privatized electricity distribution to three private distribution companies. Most research was concerned with the impact of privatization on energy reliability, tariff settings and regulation issues. This paper looks at two under-researched themes: the expansion of services to poorer neighborhoods and the rollout of clean energy policies. This focus allows to unpack the materiality of socio-technical systems, to analyze how energy infrastructures are being technically deployed on the ground and to identify which social approach is used. To detail the specific practices of each company provides a more nuanced and accurate understanding of the reform. In-depth analysis of the three private utilities show that they interpret the reform mandate differently: they use a varied range of technical tools; they respond differently to social concerns in poorer neighborhoods; and they have distinctive internal management choices and corporate cultures. All these four factors can strengthen or undermine the transition towards increased access and clean energy. - Highlights: • Energy transition in an emerging cities aims at balancing environmental and social concerns. • Utilities have distinct transition paths despite similar privatization and regulation framework. • Utilities paths depend on spatial, social, managerial and corporate considerations. • Utilities' strategies are shaped by urban challenges rather than by energy policies

  17. R&D+ i Strategic Management in a Public Company in the Brazilian Electric Sector

    Directory of Open Access Journals (Sweden)

    Ruy De Quadros Carvalho

    2013-05-01

    Full Text Available The purpose of this paper is - by reporting an experience of structuring processes and tools related to the strategic management of R&D in the electricity sector – to show the conditions and potential for improved efficiency, efficacy, and effectiveness in the R&D program set by ANEEL. The methodology is action research. This is because the proposed and tested model is the result of reflection and resolution of critical organizational issues, applied in a public company in the electric power sector. Act No. 9,991 of July 24, 2000 provides for the obligation on the part of concessionaires, permittees, and licensees in the electric power sector to invest part of their operating revenue in research and development (R&D. For the effective implementation of these legal obligations, companies prepare their annual R&D programs, comprising projects that aim at developing innovative solutions for their processes and increasing business efficiency. However, the urgency to comply with the contractual provisions, coupled with the small amount of experience most companies have when it comes to carrying out R&D activities and projects, has led to the gradual formation of a mode of R&D implementation and management that does not favor its optimization and alignment with the goals the utility companies and the sector’s own technological development . The approach proposed in this paper consists of structuring the processes and tools related to the management of R&D driven by innovation (R&D+i and aligned with with the business strategy. These processes include the adoption of procedures and tools to manage structured, integrated decision-making flows involved in the innovation process, aiming at full alignment with business goals and objectives.

  18. 78 FR 32384 - South Carolina Electric and Gas Company; Notice Denying Motion to Intervene and Rejecting Request...

    Science.gov (United States)

    2013-05-30

    ... Commission staff's order. \\1\\ South Carolina Elec. and Gas Co., 143 FERC ] 62,041 (2013). Rule 214(b)(2) of... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 516-476] South Carolina... 22, 2013, Commission staff issued an order approving South Carolina Electric and Gas Company's...

  19. Landfill Gas Electricity Project Interconnection Webinar

    Science.gov (United States)

    This page contains information about a webinar LMOP offered to LMOP Partners to address questions associated with connecting electricity generating systems to the grid during LFG energy project planning and implementation.

  20. Profiting from competition: Financial tools for electric generation companies

    Science.gov (United States)

    Richter, Charles William, Jr.

    Regulations governing the operation of electric power systems in North America and many other areas of the world are undergoing major changes designed to promote competition. This process of change is often referred to as deregulation. Participants in deregulated electricity systems may find that their profits will greatly benefit from the implementation of successful bidding strategies. While the goal of the regulators may be to create rules which balance reliable power system operation with maximization of the total benefit to society, the goal of generation companies is to maximize their profit, i.e., return to their shareholders. The majority of the research described here is conducted from the point of view of generation companies (GENCOs) wishing to maximize their expected utility function, which is generally comprised of expected profit and risk. Strategies that help a GENCO to maximize its objective function must consider the impact of (and aid in making) operating decisions that may occur within a few seconds to multiple years. The work described here assumes an environment in which energy service companies (ESCOs) buy and GENCOs sell power via double auctions in regional commodity exchanges. Power is transported on wires owned by transmission companies (TRANSCOs) and distribution companies (DISTCOs). The proposed market framework allows participants to trade electrical energy contracts via the spot, futures, options, planning, and swap markets. An important method of studying these proposed markets and the behavior of participating agents is the field of experimental/computational economics. For much of the research reported here, the market simulator developed by Kumar and Sheble and similar simulators has been adapted to allow computerized agents to trade energy. Creating computerized agents that can react as rationally or irrationally as a human trader is a difficult problem for which we have turned to the field of artificial intelligence. Some of our

  1. IT Project Management in Very Small Software Companies

    DEFF Research Database (Denmark)

    Shakir, Shahid Nadeem; Nørbjerg, Jacob

    2013-01-01

    In developing countries very small software companies (VSSCs) with only 1-10 employees play an important role both in the local economy and as providers of software and services to customers in other parts of the world. Understanding and improving their IT project management (ITPM) practices...... and challenges are, therefore, important in the local as well as the larger context of globalized software development. There is, however, very little research into small shop software practices in developing countries. The current paper explores actual ITPM practices in Pakistani VSSCs based on a qualitative...... study of seven Pakistani VSSCs. We find that some Pakistani ITPM practices are similar to what is reported from VSSCs in other parts of the world, while others seem to be related to the companies' position in the global software development chain. This paper is part of a larger research project aiming...

  2. MARKETING STRATEGIES AND TACTICS OF ADVERTISING PROJECTS FOR TOURISM COMPANIES

    OpenAIRE

    O. M. Tolmachev

    2016-01-01

    The subject / topic. The relevance of the article is that today tourism is a massive social and economic phenomenon of global scale, as is known, any vacation begins with advertising. Therefore, for the progressive development of tourism companies need to develop an eff ective strategy and tactics of advertising projects. Potential consumers have become more discerning and prudent, so a consultant position with the fl ood of information does not work. Works expert position, when the product i...

  3. Fiscal planning of private electricity production projects

    International Nuclear Information System (INIS)

    Gauthier, R.

    2002-01-01

    Various fiscal considerations frequently encountered in the context of the planning of private electricity production projects were described. Two major themes were discussed: 1) the different jurisdictional vehicles that can be used during the planning of private electricity production projects and the associated fiscal considerations, and 2) the two main fiscal incentives of the Income Tax Act (Canada) which could impact on the financing and operation costs of such a project, namely the accelerated amortization and the possibility of deducting the costs associated to renewable energies and energy savings in Canada. This was a general presentation that did not go into specific details and did not represent a legal opinion. refs

  4. 77 FR 7211 - Pacific Gas and Electric Company, Diablo Canyon Independent Spent Fuel Storage Installation...

    Science.gov (United States)

    2012-02-10

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 72-26; NRC-2011-0110] Pacific Gas and Electric Company...) issued NRC Materials License No. SNM-2511 to the Pacific Gas and Electric Company (PG&E) for the Diablo.... 5. TS 3.1.2, ``Spent Fuel Storage Cask (SFSC) Heat Removal System,''--revise to allow the HI-STORM...

  5. 76 FR 44323 - National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of...

    Science.gov (United States)

    2011-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-49-000] National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of Petition for Declaratory Order Take..., 18 CFR 385.207, National Grid Transmission Services Corporation and Bangor Hydro Electric Company...

  6. 76 FR 36533 - Bangor Hydro Electric Company; Notice of Request for Waiver

    Science.gov (United States)

    2011-06-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-5-000] Bangor Hydro Electric Company; Notice of Request for Waiver Take notice that on June 13, 2011, pursuant to section 358.1(d) of the Commission's regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor...

  7. A Bayesian stochastic frontier analysis of Chinese fossil-fuel electricity generation companies

    International Nuclear Information System (INIS)

    Chen, Zhongfei; Barros, Carlos Pestana; Borges, Maria Rosa

    2015-01-01

    This paper analyses the technical efficiency of Chinese fossil-fuel electricity generation companies from 1999 to 2011, using a Bayesian stochastic frontier model. The results reveal that efficiency varies among the fossil-fuel electricity generation companies that were analysed. We also focus on the factors of size, location, government ownership and mixed sources of electricity generation for the fossil-fuel electricity generation companies, and also examine their effects on the efficiency of these companies. Policy implications are derived. - Highlights: • We analyze the efficiency of 27 quoted Chinese fossil-fuel electricity generation companies during 1999–2011. • We adopt a Bayesian stochastic frontier model taking into consideration the identified heterogeneity. • With reform background in Chinese energy industry, we propose four hypotheses and check their influence on efficiency. • Big size, coastal location, government control and hydro energy sources all have increased costs

  8. Law project modified by the Senate after urgency declaration relative to the electric and gas public utilities and to the power and gas companies; Projet de loi modifie par le Senat apres declaration d'urgence relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This document is the modifications made by the French Senate after the first reading of the law project adopted by the House of Commons and relative to the change of status of the power and gas public utilities in the framework of the deregulation of European energy markets. This law changes the juridical status of the two state monopolies Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. The document lists the modifications made by the Senate article by article. (J.S.)

  9. Student Learning Projects in Electric Vehicle Engineering

    DEFF Research Database (Denmark)

    Ritchie, Ewen; Leban, Krisztina Monika

    2012-01-01

    This paper presents the didactic problem based learning method in general use at Aalborg University as applied to Electric Mobility. Advantage is taken of this method to link student learning to current research projects. This offers advantages to the students and the researchers. The paper...... introduces the subject, presents the research of the Department of Energy Technology and describes the relevant syllabus. It continues to present a range of titles of previous research linked student project projects, and to fill in some of the detail, an example of such a student project. The paper...

  10. Report of the Economy, Sustainable Development and Land Planning Commission aiming at authorizing electricity final user and small companies to go back to the electricity regulated price

    International Nuclear Information System (INIS)

    2010-01-01

    This report first presents the French regulated price system by recalling the legal bases for electricity and natural gas pricing, and by describing the progressive process of the electricity and natural gas market opening in France. It outlines that a reversibility principle has been introduced along with regulated pricing in most of the European Union countries. It also comments the complexity created on this issue by successive laws in France, the consequences of the soon coming law on the new organization of the electricity market. Then, the report comments the proposition which aims at authorizing electricity household users and small companies to go back to the regulated electricity price, thereby perpetuating the reversibility principle, while maintaining a criterion of installed electricity power, including natural gas prices and new consumption sites. A table proposes a comparison between existing texts, the present law project and this Commission proposition

  11. Draft environmental statement. Homestake Mining Company: Homestake Mining Company Pitch Project (Saguache County, Colorado)

    International Nuclear Information System (INIS)

    1978-01-01

    The draft concerns the proposed issuance of approvals, permits, and licenses to the Homestake Mining Company for the implementation of the Pitch Project. The Pitch Project consists of mining and milling operations involving uranium ore deposits located in Gunnison National Forest, Saguache County, Colorado. Mining of uranium ore will take place over an estimated period of 20 years; a mill with a nominal capacity of 544 metric tons per day (600 tons per day) will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 544 metric tons per day (600 tons per day), will be buried onsite at the head end of a natural valley. The environmental impacts are summarized in sections on the existing environment, applicant's proposed mining and milling operation, environmental effects of accidents, monitoring programs, productivity, commitment of resources, alternatives, and cost-benefit evaluation

  12. Shutdown risk management applied at Philadelphia Electric Company

    International Nuclear Information System (INIS)

    Dagan, William J.; True, Douglas E.; Wilson, Thomas; Truax, William

    2004-01-01

    The development and implementation of an effective risk management program requires basic risk or safety knowledge and the conversion of such information into effective management tools. ERIN Engineering and Research, Inc., under contract to the Electric Power Research Institute, has developed an effective program. Outage Risk Assessment and Management (ORAM), to provide plant and management personnel with understandable results of shutdown risk studies. With this tool, the impact of plans and decision options can be readily determined and displayed for the decision maker. This paper describes these methods and their application to the Limerick Nuclear Station of Philadelphia Electric Company. It also sets forth a broader application of these methods to include support of management decisions at-power and following forced outages. The result is an integrated risk management framework which can allow management and technical personnel to utilize readily available and understandable risk insights to optimize each activity. This paper addresses the resolution of several key issues in detail: How was the ORAM risk management method employed to represent the existing plant shutdown procedures and policies? How did the ORAM risk management method enhance the decision-making ability of the outage management staff? How was the ORAM software efficiently integrated with the outage scheduling software? How is quantitative risk information generated and used for outage planning and control? The ORAM risk management philosophy utilizes a series of colors to depict various risk configurations. Each such configuration has associated with it clear guidance. By modifying the conditions existing in the plant it is possible to impact the type of risk being encountered as well as the guidance which is appropriate for that period. In addition, the duration of a particular configuration can be effectively managed to reduce the overall risk impact. These are achieved with minimal

  13. Formulation of a projection model of electric power demand applied to isolated systems in natural development: the case of the brazilian electric company of Rondonia territory; Formulacao de um modelo de projecao de demanda de energia eletrica aplicado a sistemas isolados em desenvolvimento natural: o caso da CERON - Centrais Eletricas de Rondonia

    Energy Technology Data Exchange (ETDEWEB)

    Dourado, Rosana Aparecida

    2004-07-01

    The Electricity inserts it self more than other services in the economy and in the Brasilian society resulting an increase of market of electrical energy more than that of economy e consequently in the national energy bases. Given the importance of the definition of the demand of electrical energy inside the development process of a region, the objective of this dissertation is to propose a model of forecasting energy demand applied to a small scale utility. With basing on the foundation that the electrical energy demand varies accordingly with the region, social levels and economical conditions and also the activities developed, the method utilized was a definition of a set of representative variables in this context, using the relation between the population an the number of residential consumers; consumption per residential consumer and the consumption structure of the residential segment over the total demand. The results with the application of the model utilizing this philosophy of the technique of modeling scenes, permitted the definition of electrical energy demand for the market of the Brazilian electric company CERON S.A. like a case study. (author)

  14. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  15. Assessment and financing of electric power projects

    International Nuclear Information System (INIS)

    Moscote, R.A.

    1976-01-01

    The aim of the appraisal of a project is to examine the economic need which a project is designed to meet, to judge whether the project is likely to meet this need in an efficient way, and to conclude what conditions should be attached to eventual Bank financing. Bank involvement continues throughout the life of the project helping to ensure that each project is carried out at the least possible cost and that it makes the expected contribution to the country's development. This paper gives an idea about the origin, nature and functions of the World Bank Group, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a review of past lending and probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  16. 77 FR 74125 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-12-13

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability bleed... received reports of three failure events of OBV ring lock fuel fittings on GE CF34-8C turbofan engines. Two...

  17. Appraisal and financing of electric power projects

    International Nuclear Information System (INIS)

    Sheehan, R.H.

    1975-01-01

    This paper starts with the origin, nature and functions of the World Bank Group, reviews the past lending, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a look at the probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  18. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  19. 76 FR 69713 - Application To Export Electric Energy; BP Energy Company

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-314-A] Application To Export Electric Energy; BP Energy.... SUMMARY: BP Energy Company (BP Energy) has applied to renew its authority to transmit electric energy from... electric energy from the United States to Mexico as a power marketer for a five-year term using existing...

  20. 76 FR 69712 - Application To Export Electric Energy; BP Energy Company

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-315-A] Application To Export Electric Energy; BP Energy.... SUMMARY: BP Energy Company (BP Energy) has applied to renew its authority to transmit electric energy from... BP Energy to transmit electric energy from the United States to Canada as a power marketer for a five...

  1. 17 CFR 250.7 - Companies deemed not to be electric or gas utility companies.

    Science.gov (United States)

    2010-04-01

    ... status afforded by paragraph (b)(1) of this section, any such company shall file with this Commission a... a statement of receipts and expenditures for such year and of financial status at its end. (3) As a prerequisite to retaining the status afforded by paragraph (b)(1) of this section, any such company shall...

  2. Quality assurance system in electric power companies in Japan, (2)

    International Nuclear Information System (INIS)

    Hamaguchi, Shun-ichi

    1980-01-01

    The organization for the quality assurance in nuclear power plants of Kansai Electric Power Co., Inc. is introduced. It is still in investigation stage what quality assurance (QA) organization and system is the best. The QA investigation project team was organized in the form directly supervised by the Office of President. The purpose of QA in operation is to maintain the functions of power plants in good condition over the lifetime of the power plants after starting the operation, and the QA is divided into the following five items: (1) running operation, (2) check-up and maintenance, (3) in-service testing and inspection, (4) regular inspection, (5) general application control. The purposes and works to be implemented for these items are listed in a table, and explained in detail. The quality control in regular inspection is described about 4 stages is purchase order and contract, design, construction, and adjusting operation. Also further improvement of QA in operating nuclear power plants by implementing the next items has been decided to make the most of the teachings in the accident of Three Mile Island plant. (1) Reinforcement of operation management system, (2) completion of the training for operators, (3) clarification of the command system for operational control, and (4) change of installations and review of application. As seen in the above description, the important tasks in QA activities are the matching to the existing installations and the adjustment of interfaces with the equipments in operation. (Wakatsuki, Y.)

  3. 78 FR 21578 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-11

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part... GE model GEnx-2B67 and GEnx- 2B67B turbofan engines with BAI air duct, P/N 2469M32G01, and support...

  4. DETERMINANTS AFFECTING THE SUCCESS OF DISTRIBUTION GRID PROJECTS IN BINH THUAN POWER COMPANY, VIETNAM

    OpenAIRE

    Pham Van Tai* & Le Duc Thu

    2017-01-01

    The research identified the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company, clarify the mutual relationship between the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company and recommended and rated the solution to enhance the success of the distribution grid project in Binh Thuan Power Company. The research had found fours critical factors: External factors of project, Controlling and coordina...

  5. L'Anse Warden Electric Company Boiler Number One Emission Test Report – March 2017

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in March 2017, and the report became available in June 2017

  6. L'Anse Warden Electric Company Boiler Number One Emission Test Report – December 2016

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in December 2016, and the report became available in January 2017

  7. L'Anse Warden Electric Company Boiler Number One Emission Test Report – July 2016

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in July 2016, and the report became available in August 2016.

  8. L'Anse Warden Electric Company Boiler Number One Emission Test Report – June 2017

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in March 2017, and the report became available in June 2017

  9. Westinghouse Electric Company experiences in chemistry on-line monitoring in Eastern European nuclear power plants

    International Nuclear Information System (INIS)

    Balavage, J.

    2001-01-01

    Westinghouse Electric Company has provided a number of Chemistry On-Line Monitoring (OLM) Systems to Nuclear Power Plants in Eastern Europe. Eleven systems were provided to the Temelin Nuclear Power Plant in the south of the Czech Republic. Four systems were provided to the Russian NPP at Novovoronezh. In addition, a system design was developed for primary side chemistry monitoring for units 5 and 6 of another eastern European VVER. The status of the Temelin OLM systems is discussed including updates to the Temelin designs, and the other Eastern European installations and designs are also described briefly. Some of the problems encountered and lessons learned from these projects are also discussed. (R.P.)

  10. Medium Duty Electric Vehicle Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Mackie, Robin J. D. [Smith Electric Vehicles Corporation, Kansas City, MO (United States)

    2015-05-31

    The Smith Electric Vehicle Demonstration Project (SDP) was integral to the Smith business plan to establish a manufacturing base in the United States (US) and produce a portfolio of All Electric Vehicles (AEV’s) for the medium duty commercial truck market. Smith focused on the commercial depot based logistics market, as it represented the market that was most ready for the early adoption of AEV technology. The SDP enabled Smith to accelerate its introduction of vehicles and increase the size of its US supply chain to support early market adoption of AEV’s that were cost competitive, fully met the needs of a diverse set of end users and were compliant with Federal safety and emissions requirements. The SDP accelerated the development and production of various electric drive vehicle systems to substantially reduce petroleum consumption, reduce vehicular emissions of greenhouse gases (GHG), and increase US jobs.

  11. Projected costs of generating electricity - 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This joint report by the International Energy Agency (IEA) and the OECD Nuclear Energy Agency (NEA) is the seventh in a series of studies on electricity generating costs. It presents the latest data available for a wide variety of fuels and technologies, including coal and gas (with and without carbon capture), nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal as well as combined heat and power (CHP). It provides levelised costs of electricity (LCOE) per MWh for almost 200 plants, based on data covering 21 countries (including four major non-OECD countries), and several industrial companies and organisations. For the first time, the report contains an extensive sensitivity analysis of the impact of variations in key parameters such as discount rates, fuel prices and carbon costs on LCOE. Additional issues affecting power generation choices are also examined. The study shows that the cost competitiveness of electricity generating technologies depends on a number of factors which may vary nationally and regionally. Readers will find full details and analyses, supported by over 130 figures and tables, in this report which is expected to constitute a valuable tool for decision makers and researchers concerned with energy policies and climate change

  12. A study of the contract terms offered by the regional electricity companies to generators of renewable energy outside the NFFO

    International Nuclear Information System (INIS)

    Williams, N.C.; Limbrick, A.J.

    1996-01-01

    The aim of this study was to review the terms and conditions of contract for the purchase of renewable energy currently offered by the Regional Electricity Companies (RECs) outside the Non-Fossil Fuel Obligation (NFFO), through consultation with electricity generators. It focused on projects contracted under the first and second tranches of the NFFO, and those which have been developed outside this support mechanism (both renewable and fossil-fuelled), but which are characterised by being ''embedded'' in the RECs' distribution networks. (UK)

  13. Oilfield Flare Gas Electricity Systems (OFFGASES Project)

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Henderson; Robert Fickes

    2007-12-31

    The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas

  14. 78 FR 47235 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-05

    ... cycle counts of those LLPs to account for the additional low cycle fatigue (LCF) life consumed during... Boeing 747-8 flight tests had consumed more cyclic life than they would have in revenue flight cycles... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed...

  15. Report made on behalf of the mixed parity commission in charge of the text proposal about the remaining dispositions to be discussed of the project of law relative to the electric and gas public utilities and to the electric and gas companies; Rapport fait au nom de la Commission mixte paritaire chargee de proposer un texte sur les dispositions restant en discussion du projet de loi relatif au service public de l'electricite et du gaz et aux entreprises electriques et gaziere

    Energy Technology Data Exchange (ETDEWEB)

    Lenoir, J.C.; Poniatowski, L

    2004-07-01

    This project of law aims to adapt the electricity and gas sector to the new economical context of opening of the energy markets to competition. It gives to energy companies the internal organization base necessary to warrant a high level of service and a transparent and non-discriminatory access of third parties to transport and distribution networks. These evolutions will allow Electricite de France (EdF) and Gaz de France (GdF) companies to compete on equal terms with their European competitors. It confirms first the prime role of public utility of both companies and then transposes the dispositions of the European directives relative to the organization of EdF and GdF integrated companies. It foresees the creation of two daughter companies for the management of energy transport activities. The project of law foresees also the change of the status of EdF and GdF companies and the reform of the retirement pensions of the personnel. This report presents, first, in a comparative table the articles adopted by the French house of commons and the changes adopted by the Senate. Then, a common text is proposed by the mixed parity commission for the articles that remained under discussion. (J.S.)

  16. Electric vehicle life cycle cost analysis : final research project report.

    Science.gov (United States)

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  17. TEP Power Partners Project [Tucson Electric Power

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-02-06

    The Arizona Governor’s Office of Energy Policy, in partnership with Tucson Electric Power (TEP), Tendril, and Next Phase Energy (NPE), formed the TEP Power Partners pilot project to demonstrate how residential customers could access their energy usage data and third party applications using data obtained from an Automatic Meter Reading (AMR) network. The project applied for and was awarded a Smart Grid Data Access grant through the U.S. Department of Energy. The project participants’ goal for Phase I is to actively engage 1,700 residential customers to demonstrate sustained participation, reduction in energy usage (kWh) and cost ($), and measure related aspects of customer satisfaction. This Demonstration report presents a summary of the findings, effectiveness, and customer satisfaction with the 15-month TEP Power Partners pilot project. The objective of the program is to provide residential customers with energy consumption data from AMR metering and empower these participants to better manage their electricity use. The pilot recruitment goals included migrating 700 existing customers from the completed Power Partners Demand Response Load Control Project (DRLC), and enrolling 1,000 new participants. Upon conclusion of the project on November 19, 2013; 1,390 Home Area Networks (HANs) were registered; 797 new participants installed a HAN; Survey respondents’ are satisfied with the program and found value with a variety of specific program components; Survey respondents report feeling greater control over their energy usage and report taking energy savings actions in their homes after participating in the program; On average, 43 % of the participants returned to the web portal monthly and 15% returned weekly; and An impact evaluation was completed by Opinion Dynamics and found average participant savings for the treatment period1 to be 2.3% of their household use during this period.2 In total, the program saved 163 MWh in the treatment period of 2013.

  18. 77 FR 56241 - Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000

    Science.gov (United States)

    2012-09-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0131] Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000 By letter dated December 10, 2010, Westinghouse Electric... final design approval (FDA) for the Advanced Passive 1000 (AP1000) design upon the completion of...

  19. Management report 2001 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    The COPEL - Electrical Company of Parana State, Brazil - management report of calendar year of 2000 is presented, covering the following topics: COPEL - standing for much more than energy; extending the benefits of electricity to everyone in Parana state, Brazil; protecting and recovering the environment; philanthropy and volunteer work; education; social integration; support to cultural expression and gratitude

  20. Social balance sheet 2000 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    The COPEL - Electrical Company of Parana State, Brazil social balance report of calendar year of 2000 is presented, covering the following topics: COPEL - standing for much more than energy; extending the benefits of electricity to everyone in Parana state, Brazil; protecting and recovering the environment; philanthropy and volunteer work; education; social integration; support to cultural expression and gratitude

  1. Joint management of water and electricity in State Water Project

    Science.gov (United States)

    Yang, T.

    2013-12-01

    Understanding the relationship between California's water and electrical power is important for improving the management and planning of these two vital resources to the state's economy development and people's well-being. It is often unclear for consumers, managers and decision-makers that water and electricity in California are inextricably connected. In the past, insufficient considerations of electricity production, consumption and cost in the State Water Project (SWP) - the world's largest publicly built and operated water and power development and conveyance system-has led to significant water rate and electricity rate increase. An innovative concept of this proposed study is developing new technology capable of managing and planning water and power jointly in SWP to promote its operation efficiency, sustainability and resilience to potential water shortage caused by climate change and population increase. To achieve this goal, a nonlinear, two-fold network model describing water delivery in company with power consumption and generation will be constructed, and a multi-objective optimization scheme is to be used to resolve this complex nonlinear network problem.

  2. MARKETING STRATEGIES AND TACTICS OF ADVERTISING PROJECTS FOR TOURISM COMPANIES

    Directory of Open Access Journals (Sweden)

    O. M. Tolmachev

    2016-01-01

    Full Text Available The subject / topic. The relevance of the article is that today tourism is a massive social and economic phenomenon of global scale, as is known, any vacation begins with advertising. Therefore, for the progressive development of tourism companies need to develop an eff ective strategy and tactics of advertising projects. Potential consumers have become more discerning and prudent, so a consultant position with the fl ood of information does not work. Works expert position, when the product is as if created for the client, that is, the product exists only in synchronism with the buyer. In view of this increased competition between operators of tourist services, and certain segments of the market saturation of a significant amount of travel products with a similar orientation, a unique role for the positioning on the basis of marketing strategy as a process for creating a unique tourism product in the market.The purpose / goal. The aim of the article is to study the features of the marketing strategies of advertising processes in the market of travel agencies and find directions of their improvement in current economic conditions.Article Objectives: To investigate the nature and content of the concept of "marketing strategy of advertising processes"; systematize criteria for the classification of the Company's strategy in the market of tourist services; analyze the features of advertising projects and identify promising directions for improving the marketing strategies.Methodology. The methodological basis of this article are comparative analysis methods.Results. The essence and content of the concept of "marketing strategy of advertising processes." The features of the market of tourist services, allocated target audiences, identifies key factors and trends in the development of this market.The new system is a product of values, square S. Kovalev, who identified four existing mentality of the person. When advertising article or video include

  3. Measuring efficiency and productivity change (PTF) in the Peruvian electricity distribution companies after reforms

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Reyes, Raul [Organismo Supervisor de la Inversion en Energia y Mineria, Osinergmin (Peru); Tovar, Beatriz [Infrastructure and Transport Research Group (EIT), Department of Applied Economics, University of Palmas de Gran Canaria (Spain)

    2009-06-15

    This paper analyzes the evolution of productivity of the electricity distribution companies in Peru, to assess whether reforms have improved the efficiency in this sector. The paper also identifies potential sources of productivity changes, based on market restructuring the electricity sector and changes in property. To do this, we rely on a set of data for 14 distribution companies, for the period 1996-2006. Our analysis suggests that improvements in the efficiency and productivity of electricity distribution in Peru have occurred, and that there is a relationship between the restructuring of distribution sector and the enhancement of productivity. (author)

  4. The financial and accounting implications of the privatization of the regional electricity companies in the UK

    International Nuclear Information System (INIS)

    Thomson, L.

    1993-01-01

    This paper reviews some of the financial and accounting implications of the privatization of the electricity distribution and supply sector in England and Wales, specifically the transformation of the Electricity Area Boards into the 12 Regional Electricity Companies (RECs). It considers the factors influencing the setting of post-privatization price control factors; the capital restructuring of the RECs; the valuation placed by the Secretary of State for Energy on each company at flotation, and market reaction to this as shown in subsequent changes in share price; and changes in the information provided in the RECs' accounts over the privatization period. (Author)

  5. Measuring efficiency and productivity change (PTF) in the Peruvian electricity distribution companies after reforms

    International Nuclear Information System (INIS)

    Perez-Reyes, Raul; Tovar, Beatriz

    2009-01-01

    This paper analyzes the evolution of productivity of the electricity distribution companies in Peru, to assess whether reforms have improved the efficiency in this sector. The paper also identifies potential sources of productivity changes, based on market restructuring the electricity sector and changes in property. To do this, we rely on a set of data for 14 distribution companies, for the period 1996-2006. Our analysis suggests that improvements in the efficiency and productivity of electricity distribution in Peru have occurred, and that there is a relationship between the restructuring of distribution sector and the enhancement of productivity. (author)

  6. NASA's nuclear electric propulsion technology project

    International Nuclear Information System (INIS)

    Stone, J.R.; Sovey, J.S.

    1992-07-01

    The National Aeronautics and Space Administration (NASA) has initiated a program to establish the readiness of nuclear electric propulsion (NEP) technology for relatively near-term applications to outer planet robotic science missions with potential future evolution to system for piloted Mars vehicles. This program was initiated in 1991 with a very modest effort identified with nuclear thermal propulsion (NTP); however, NEP is also an integral part of this program and builds upon NASA's Base Research and Technology Program in power and electric propulsion as well as the SP-100 space nuclear power program. The NEP Program will establish the feasibility and practicality of electric propulsion for robotic and piloted solar system exploration. The performance objectives are high specific impulse (200 greater than I(sub sp) greater than 10000 s), high efficiency (over 0.50), and low specific mass. The planning for this program was initially focussed on piloted Mars missions, but has since been redirected to first focus on 100-kW class systems for relatively near-term robotic missions, with possible future evolution to megawatt-and multi-megawatt-class systems applicable to cargo vehicles supporting human missions as well as to the piloted vehicles. This paper reviews current plans and recent progress for the overall nuclear electric propulsion project and closely related activities. 33 refs

  7. The Nikola project intelligent electric vehicle integration

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Marinelli, Mattia; Olesen, Ole Jan

    2014-01-01

    The electric vehicle (EV) has certain properties that elevate its relevance to the smart grid. If EV integration is to meet its potential in supporting an economic and secure power system and at the same time lower the operating costs for the owner, it is necessary to thoroughly and systematically...... investigate the value-adding services that an EV may provide. The Danish Nikola project defines EV services as the act of influencing the timing, rate and direction of the power and energy exchanged between the EV battery and the grid to yield benefits for user, system, and society. This paper describes...

  8. Forecasted electric power demands for the Baltimore Gas and Electric Company. Volume 1 and Volume 2. Documentation manual

    International Nuclear Information System (INIS)

    Estomin, S.L.; Beach, J.E.; Goldsmith, J.V.

    1991-05-01

    The two-volume report presents the results of an econometric forecast of peak load and electric power demand for the Baltimore Gas and Electric Company (BG ampersand E) through the year 2009. Separate energy sales models were estimated for residential sales in Baltimore City, residential sales in the BG ampersand E service area excluding Baltimore City, commercial sales, industrial sales, streetlighting sales, and Company use plus losses. Econometric equations were also estimated for electric space heating and air conditioning saturation in Baltimore City and in the remainder of the BG ampersand E service territory. In addition to the energy sales models and the electric space conditioning saturation models, econometric models of summer and winter peak demand on the BG ampersand E system were estimated

  9. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  10. Competition and monopolies, exclusive rights for electricity companies

    International Nuclear Information System (INIS)

    Taccoen, L.

    1993-01-01

    The European Community has decided to liberalize the electric power industry within the community abolishing state monopolies, and allowing third party access. This policy was based on until then untested free-market theories. The advantage of state monopoly was that it could guarantee security of supply - vital with a non-storable commodity such as electricity. The advantages of TPA were said to be that it would lower prices, and that the market would ensure security of supply. The United Kingdom experimented in deregulation and end-user choice. In this experiment long-term planning has suffered, all new power stations are gas-fired because of low capital cost, and the effects on the British coal industry have been catastrophic. Thus, the effect of TPA seems to be a switch to natural gas, and an increase in prices to domestic consumers. Further research is needed, rather than a switch to TPA based on ideology alone

  11. Competition and monopolies, exclusive rights for electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Taccoen, L [Electricite de France (France)

    1993-01-01

    The European Community has decided to liberalize the electric power industry within the community abolishing state monopolies, and allowing third party access. This policy was based on until then untested free-market theories. The advantage of state monopoly was that it could guarantee security of supply - vital with a non-storable commodity such as electricity. The advantages of TPA were said to be that it would lower prices, and that the market would ensure security of supply. The United Kingdom experimented in deregulation and end-user choice. In this experiment long-term planning has suffered, all new power stations are gas-fired because of low capital cost, and the effects on the British coal industry have been catastrophic. Thus, the effect of TPA seems to be a switch to natural gas, and an increase in prices to domestic consumers. Further research is needed, rather than a switch to TPA based on ideology alone.

  12. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  13. Anaheim electric vehicle car-sharing project

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, D. [City of Anaheim Transportation Programs Planner, Anaheim, CA (United States); Chase, B. [Costa Mesa Planning Center, Costa Mesa, CA (United States)

    2000-07-01

    This paper described how the city of Anaheim in California is looking into a variety of clean transportation options for visitors, employees and residents in an effort to minimize air quality and congestion impacts. The city, which attracts approximately 24 million visitors annually, is looking into an electric vehicle (EV) car-sharing program that promotes EV use in multiple applications for both short- and long-term rental opportunities. There are two components to the program which provides eight 5-passenger electric Toyota RAV4 vehicles to both local employees and visitors. The electric RAV4s include nickel-hydride batteries which provide a range of 120 miles per charge. The city has already developed a network of public accessible EV charging stations and this project is a perfect extension of the city's continued efforts to seek opportunities to apply EV technologies within its jurisdictions. The Station Car Program provides flexibility for rail commuters to get from the rail station to their place of employment. On weekdays, the EVs are available to registered commuters at two rail stations to drive to and from work. A total of 32 commuters can benefit from the program at a cost of $40 per month. On weekends, the EVs are offered to visitors through Budget Rent-a-Car Agency at a rate comparable to gasoline-fueled vehicles. So far, participant feedback has been positive and the city is looking into expanding its efforts to provide clean transportation options. tab.

  14. Swiss electricity grid - Benchmarking pilot project

    International Nuclear Information System (INIS)

    2001-01-01

    This article is a short version of the ENET number 210369. This report for the Swiss Federal Office of Energy (SFOE) describes a benchmarking pilot project carried out as a second phase in the development of a formula for the regulation of an open electricity market in Switzerland. It follows on from an initial phase involving the definition of a 'blue print' and a basic concept. The aims of the pilot project - to check out the practicability of the concept - are discussed. The collection of anonymised data for the benchmarking model from over 30 electricity utilities operating on all 7 Swiss grid levels and their integration in the three areas 'Technology', 'Grid Costs' and 'Capital Invested' are discussed in detail. In particular, confidentiality and data protection aspects are looked at. The methods used in the analysis of the data are described and the results of an efficiency analysis of various utilities are presented. The report is concluded with a listing of questions concerning data collection and analysis as well as operational and capital costs that are still to be answered

  15. Alexandria electricity distribution company (AEDC) experience in energy conservation

    International Nuclear Information System (INIS)

    Youssef, K.; Soliman, O.; Nabil, A.

    2005-01-01

    Alexandria is the second capital of Egypt and represents forty percent of Egypt's industrial activities. There are about 350 big industrial firms and more than 2 thousands small and medium enterprises. This industries produces significant greenhouse gas emission. Good efforts are exerted in the field of energy saving and environment conservation by AEDC in order to reduce and limit greenhouse gas emission. AEDC participated in many projects sponsored by different foreign counterparts. These projects are: 1 - Energy and urban environment in Mediterranean countries: Phases 1, 2(1995-1996). 2 - Demand side management (DSM) 1996 - 1997. 3 - Energy and urban environment in Mediterranean countries: Phases 3 (2002-2003). 4 - Global environment facility ( GEF ) 1999 - 2003. The results of these pilot projects are presented in details in this paper

  16. Resolution 148/012. It authorize the 'Central Libertador / SA aeolian generation' company to generate an aeolian electricity source by an electric power generating plant located in Lavalleja town 1 AA catastral section and in Maldonado town 4 AA Catastral section, and the 'Sistema inerconectado Nacional' connection

    International Nuclear Information System (INIS)

    2012-01-01

    This decree authorizes the generation of electricity using aeolian energy as the primary electricity source. This project was presented by the 'Libertador / S.A' aeolian generation company with the proposal to instal an electrical plant in Lavalleja town. This authorization is according to the Electric Wholesale Market regulation

  17. Case Writing Projects in Co-Operation with Companies and Organizations

    OpenAIRE

    Bengtsson, Lars; Asplund, Carl-Johan

    2008-01-01

    The purpose of this paper is to present the process and evaluation of case writing projects in co-operation with companies and organizations in a course for engineering students. The case writing projects could provide an illustration and example framework for working with companies in constructing cases. Normally cases are constructed for teaching purposes in higher education. However, in order to get closer co-operation and more interest from the companies the authors encouraged the student...

  18. Report made on behalf of the commission of economic affairs, environment and territory about the law project (no. 1613), relative to the electric and gas public utilities and to the power and gas companies; Rapport fait au nom de la Commission des affaires economiques, de l'environnement et du territoire sur le projet de loi (no. 1613), relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    Lenoir, J.C.

    2004-06-01

    The aim of this report is to present to the French deputies the comments made by the commission of economic affairs, environment and territory about the law project relative to the change of status of the power and gas public utilities in the framework of the deregulation of European energy markets. This law changes the juridical status of the two state monopolies Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. The first part of the document reports on the general discussions about the law project while the second part makes a detailed analysis of each article with some proposals of modifications. A comparative table puts in parallel the existing texts, the law project and the proposals made by the commission. (J.S.)

  19. Analysis of tariff levels from electric company in relation to financing request

    International Nuclear Information System (INIS)

    Correa, A.L.S.

    1991-11-01

    The economic-financial model of the Brazilian electric sector is discussed, considering the compatibility of the practiced tariff levels to the demand of consumption market and the production and operation costs. Some institutional actions are identified as solutions for emergency questions and subsides to the big strategies. The economic-finance indicators are also presented, showing the performance of the electrical companies. (C.G.C.)

  20. Preparing Canada`s power systems for transition to the Year 2000: Y2K readiness assessment results for Canadian electric utility companies: second quarter 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-25

    The report describes the state of readiness of Canadian electric utility companies with respect to the Year 2000 computer challenge. It complements the North American Electric Reliability Council Report entitled `Preparing the Electric Power Systems of North America for Transition to the Year 2000: A Status and Work Plan.` Two surveys were employed to gather information for this report. The first, a detailed survey prepared by NERC, was forwarded to all major electric utilities that comprise the Bulk Electricity System in North America. CEA has removed the Canadian findings from the overall North American results, and has presented those findings in this report. The second was a shorter, more simplified study, conducted by CEA and Natural Resources Canada. Whereas small companies involved only in the distribution aspect of the electricity business were not asked to complete the NERC assessment, all Canadian electric utility companies were part of the shorter survey. Chapter 2 covers specifically the readiness status and project management for non-nuclear generation, nuclear generation, energy management systems, telecommunications systems, substation controls, system protection and distribution systems, business information systems, and small distribution companies.

  1. Organizational structures of companies versus project management effectiveness

    Directory of Open Access Journals (Sweden)

    Joanna Haffer

    2012-12-01

    Full Text Available An organizational structure, indicated as one out of the four main organizational conditions supporting project management, has an essential meaning for project execution. This article, based on the research results, describes different organizational structures of project-orientated enterprises, enumerating their advantages and disadvantages, and reveals the influence of inter-organizational relations on project management effectiveness in enterprises operating in Poland. The results indicate that the more a character of inter-organizational relations is heading towards project structure, the higher project management effectiveness is. In the next sequence the project management processes are supported by strong matrix structures, whereas the worst outcomes are provided by functional structures. Simultaneously, it was concluded that project structures are conducive to high advancement of project management processes, and among them, especially project risk management processes as well as communication, time and cost management processes.

  2. Fast Charging Electric Vehicle Research & Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Heny, Michael

    2014-03-31

    The research and development project supported the engineering, design and implementation of on-road Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: Short Commute: Defined as EVs performing in limited duration, routine commutes. - Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. - Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehicle-related greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment

  3. Advice presented on behalf of the commission of finances, economy and plan about the law project (no. 1613) relative to the electric and gas public utilities and to the power and gas companies; Avis presente au nom de la Commission des finances, de l'economie generale et du plan sur le projet de loi (no. 1613), relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    Carayon, B.

    2004-06-01

    The aim of this report is to present to the French deputies the advice of the commission of finances and economy about the law project relative to the change of status of the power and gas public utilities in the framework of the deregulation of European energy markets. This law changes the juridical status of the two state monopolies Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. The first part of the document reports on the general discussions and comments made by the commission about the law project while the second part concerns the detailed analysis of the articles 16 and 22 about the pension funds of EdF and GdF agents and the change of the status of both utilities. The amendments adopted by the commission for these articles conclude the report. (J.S.)

  4. 78 FR 56944 - Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation

    Science.gov (United States)

    2013-09-16

    ... process waste at the Humboldt Bay ISFSI will not significantly affect the quality of the human environment... NUCLEAR REGULATORY COMMISSION [Docket No. 72-27; NRC-2011-0115] Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory Commission. ACTION...

  5. 76 FR 68634 - Airworthiness Directives; General Electric Company (GE) CF6 Turbofan Engines

    Science.gov (United States)

    2011-11-07

    ... Airworthiness Directives; General Electric Company (GE) CF6 Turbofan Engines AGENCY: Federal Aviation... ``(c) This AD applies to * * * and CF6-80A3 turbofan engines with left-hand links * * *.'' to ``(c) This AD applies to * * * and CF6-80A3 turbofan engines, including engines marked on the engine data...

  6. 75 FR 47644 - General Electric Company, Transportation Division, Including On-Site Leased Workers From Adecco...

    Science.gov (United States)

    2010-08-06

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-71,174] General Electric Company... that was totally or partially separated from employment. It was determined, however, that imports of... Globalization Adjustment Assistance Act of 2009, section 222 of the Act (19 U.S.C. 2272) covers foreign...

  7. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Science.gov (United States)

    2010-02-25

    ... Dusenbury of the North Carolina Department of Environment and Natural Resources regarding the environmental... & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No... identification of licensing and regulatory actions requiring environmental assessments,'' the NRC prepared an...

  8. Training Needs Assessment of Technical Skills in Managers of Tehran Electricity Distribution Company

    Science.gov (United States)

    Koohi, Amir Hasan; Ghandali, Fatemeh; Dehghan, Hasan; Ghandali, Najme

    2016-01-01

    Current dissertation has been conducted in order to investigate and detect training needs of the mangers (top and middle) in Tehran Electricity Distribution Company. Research method is applied kind based on its purpose. Due to data collection method, this query is descriptive-survey type. Statistical population in this study is all of managers in…

  9. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  10. Creating a business environment in inventory management - The Philadelphia Electric Company experiences

    International Nuclear Information System (INIS)

    Franks, A.J.; Birch, H.

    1992-01-01

    Philadelphia Electric Company's (PECo's) Nuclear Engineering and Services Department was asked to develop a (non-fuel) inventory management philosophy that will optimize inventory dollars at Peach Bottom atomic power station and Limerick generating station. The ultimate goal of the project is to maximize the potential for the correct parts being available at the lowest possible level of investment. There are many factors that make the management of maintenance, repair, and operating (MRO) supply inventories more complicated than managing finished goods, work-in-progress, or raw materials. Determining correct inventory levels for nuclear power plants is complicated by the irregular demand for spare parts and the cyclic nature of demand caused by refueling outages. Based on the information collected, it was determined that PECo's nuclear group needed to develop policies and strategies to address the following issues: (1) inventory classification based on part criticality, usage, and demand forecast; (2) item level ordering policies based on classification system; (3) inventory performance management; and (4) management of obsolete/surplus parts. Currently, policies are being developed to manage surplus and obsolete materials. Opportunities are being explored regarding the potential capitalization of critical components and parts. The policies established for classification, ordering policies, and performance management are being translated into work processes via common procedures and guidelines

  11. The company project on biomedicine. The experience of Genetrix

    International Nuclear Information System (INIS)

    Rodriguez ruiz, O.; Murcia Rivera, C.

    2007-01-01

    This case of study presents the evolution of Genetrix, a biomedicine company specialized in the creation of technological medicines based on the manipulation of mother cells. Since its beginning as the first spin-off of the Science Park of Madrid, Genetrix represents a good example of productive innovation arisen from public R+D. (Author)

  12. The diverse strategies of american electricity companies in the face of de-monopolization of the electricity market

    International Nuclear Information System (INIS)

    Finon, D.; Serrato, G.

    2000-01-01

    The electricity boards in the United States of America have adopted new strategies clearly influenced by anterior regulations and by de-monopolization. Numerous mergers are only the most spectacular of these strategies, enabling the start-up handicap of size in face of new competition to be surmounted, and offering the advantage of bringing together the supply of gas and electricity. Two principal means of adaptation for the gas and electricity boards are their development in non-regulated production (equipment sharing, setting up of merchant plants), and their involvement in bulk trade and competitive retail sales; moreover some choose to specialize in electronuclear production on transport. Lastly, internationalization and diversification towards telecommunications are more frequent there than elsewhere. The purpose of this article is to characterize these strategies in comparison with those of the European electricity companies

  13. Organizational structures of companies versus project management effectiveness

    OpenAIRE

    Joanna Haffer

    2012-01-01

    An organizational structure, indicated as one out of the four main organizational conditions supporting project management, has an essential meaning for project execution. This article, based on the research results, describes different organizational structures of project-orientated enterprises, enumerating their advantages and disadvantages, and reveals the influence of inter-organizational relations on project management effectiveness in enterprises operating in Poland. The results indicat...

  14. Job safety and awareness analysis of safety implementation among electrical workers in airport service company

    Directory of Open Access Journals (Sweden)

    Putra Perdana Suteja

    2018-01-01

    Full Text Available Electrical is a fundamental process in the company that has high risk and responsibility especially in public service company such as an airport. Hence, the company that operates activities in the airport has to identify and control the safety activities of workers. On the safety implementation, the lack of workers’ awareness is fundamental aspects to the safety failure. Therefore, this study aimed to analyse the safety awareness and identify risk in the electrical workplace. Safety awareness questionnaires are distributed to ten workers in order to analyse their awareness. Job safety analysis method used to identify the risk in the electrical workplace. The preliminary study stated that workers were not aware of personal protective equipment usage so that the awareness and behavioural need to be analysed. The result is the hazard was found such as electrical shock and noise for various intensity in the workplace. While electrical workers were aware of safety implementation but less of safety behaviour. Furthermore, the recommendation can be implemented are the implementation of behaviour-based safety (BBS, 5S implementation and accident report list.

  15. Type C investigation of electrical fabrication projects in ICF Kaiser shops

    International Nuclear Information System (INIS)

    Huckfeldt, R.A.

    1995-06-01

    A Type C Investigation Board was convened to investigate an electrical miswiring problem found during the operation of the electrical distribution trailer for the TWRS Rotary Mode Core Sampling Truck number-sign 2. The trailer was designed by WHC and fabricated ICF KH on site for use in the Characterization Program. This problem resulted in a serious safety hazard since the support truck frame/chassis became electrically energized. This final report provides results of the ''Type C Investigation, Electrical Fabrication Projects in ICF KH Shops, June, 1995.'' It contains the investigation scope, executive summary, relevant facts, analysis, conclusions and corrective actions. DOE Order 5484.1, ''Environmental Protection, Safety and Health Protection Information Reporting Requirements,'' was followed in preparation of this report. Because the incident was electrical in nature and involved both Westinghouse Hanford Company and ICF Kaiser Hanford organizations, the board included members from both contractors and members with considerable electrical expertise

  16. Do acquisitions by electric utility companies create value? Evidence from deregulated markets

    International Nuclear Information System (INIS)

    Kishimoto, Jo; Goto, Mika; Inoue, Kotaro

    2017-01-01

    In the early 1990s, the United Kingdom (the UK) initiated widespread reforms in the electricity industry through a series of market liberalization policies. Several other countries have subsequently followed the lead and restructured their electricity industry. A major outcome of the deregulation effort is the spate of takeovers, both domestic and global, by electric utility companies. With the entry of new players and increasing competition, the business environment of the electricity industry has changed dramatically. This study analyzes the economic impact of mergers and acquisitions (M&As) in the electric utility industry after deregulation. We have examined acquisitions that took place between 1998 and 2013 in the United States, Canada, the UK, Germany, and France. Although previous studies showed no evidence of a positive effect on acquiring firms through M&As, we find that acquisitions by electric utility companies increased the acquiring firms’ share value and improved their operating performance, primarily through efficiency gains after the deregulation. These results are consistent with the empirical evidence and implications presented by Andrade et al. (2001) that M&A created value for the shareholders of the acquiring and target combined firms. - Highlights: • This study examined mergers and acquisitions (M&A) in electric utility industry. • The sample covered M&A between 1998 and 2013 in North America and Europe. • We found M&A significantly increased acquiring firms’ share value and operating performance. • Deregulation policy realized gains for shareholders without incurring costs for consumers.

  17. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  18. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  19. Maturity of project management in construction companies with the use of fuzzy numbers

    Science.gov (United States)

    Klaus-Rosińska, Agata; Kuchta, Dorota

    2017-07-01

    The main aim of the article is to describe issue of maturity in project management regarding construction companies. Taking into consideration this problem the literature research was made, existing project management maturity models were analyzed, model of maturity in project management (using fuzzy numbers approach) was described and tested. The results of testing stage are shown in the case study.

  20. Factors that Impact Software Project Success in Offshore Information Technology (IT) Companies

    Science.gov (United States)

    Edara, Venkatarao

    2011-01-01

    Information technology (IT) projects are unsuccessful at a rate of 65% to 75% per year, in spite of employing the latest technologies and training employees. Although many studies have been conducted on project successes in U.S. companies, there is a lack of research studying the impact of various factors on software project success in offshore IT…

  1. Clifford’s Fireplace Company Limited Brand Identity Project

    OpenAIRE

    Dee, Peter

    2009-01-01

    Peter Dee - Strategic Design and Marketing Consultant, was responsible for the design and development of the brand identity for the Clifford’s Fireplaces Company which was used on business cards, letterhead, advertisements, promotional material and e-Commerce website. Clifford's Fireplaces Ltd. was established in 1947 and with over 65 years of experience in the fireplace and home heating business it is their goal to ensure that customers obtain the most appropriate products and services to me...

  2. Robust DEA under discrete uncertain data: a case study of Iranian electricity distribution companies

    Science.gov (United States)

    Hafezalkotob, Ashkan; Haji-Sami, Elham; Omrani, Hashem

    2015-06-01

    Crisp input and output data are fundamentally indispensable in traditional data envelopment analysis (DEA). However, the real-world problems often deal with imprecise or ambiguous data. In this paper, we propose a novel robust data envelopment model (RDEA) to investigate the efficiencies of decision-making units (DMU) when there are discrete uncertain input and output data. The method is based upon the discrete robust optimization approaches proposed by Mulvey et al. (1995) that utilizes probable scenarios to capture the effect of ambiguous data in the case study. Our primary concern in this research is evaluating electricity distribution companies under uncertainty about input/output data. To illustrate the ability of proposed model, a numerical example of 38 Iranian electricity distribution companies is investigated. There are a large amount ambiguous data about these companies. Some electricity distribution companies may not report clear and real statistics to the government. Thus, it is needed to utilize a prominent approach to deal with this uncertainty. The results reveal that the RDEA model is suitable and reliable for target setting based on decision makers (DM's) preferences when there are uncertain input/output data.

  3. Projection of electrical demand in Argentina for the period from 1993 through 2010 mark of economic reform

    International Nuclear Information System (INIS)

    Goni, Margarita R.; Gonzalez, Enrique

    1996-01-01

    A projection of electrical demand for two different scenarios has been presented . The period 1993-2010 is analysed and 1993 has been taken as base year. In this study MAED program was used as well as all available information from INDEC (National Statistical Body), CAMMESA (Electrical Market Company) and Ministry of Economy. The results in the base year achieved an accuracy higher than 98%. The scenarios described different rates of growth and electrical energy uses

  4. Development of a record retention and retrieval system for the Baltimore Gas and Electric Company

    International Nuclear Information System (INIS)

    Hoffman, H.L.

    1976-01-01

    The records associated with the design and construction of a nuclear power plant have increased in both volume and complexity. Baltimore Gas and Electric Company chose to retain and make available these records by using microfilm and a computer-generated index system. The technique of filming, data assembly, and controlled distribution of this material to various locations within the Company was developed and implemented. The index system has been designed to locate information and to provide a basis for searches of the data base for special information

  5. The NICT projects: The company's source of performance ...

    African Journals Online (AJOL)

    To highlight aspects bound to the organization and to the management based on a strategy to be adopted to face any NITC project, while identifying and measuring the advantages and cost of such projects. To develop the culture and the rules of management of organizations according to the new necessities engendered ...

  6. 78 FR 7774 - Alaska Electric Light and Power Company; Notice of Preliminary Permit Application Accepted for...

    Science.gov (United States)

    2013-02-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14480-000] Alaska Electric... Comments, Motions To Intervene, and Competing Applications On January 11, 2013, Alaska Electric Light and... single 3.5-megavolt-ampere (MVA) transformer to adjust voltage to 23 kilovolts; and (7) appurtenant...

  7. Great Western Malting Company geothermal project, Pocatello, Idaho. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

    1981-12-23

    The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

  8. Electricity company managers' views of environmental issues: Implications for environmental groups and government

    International Nuclear Information System (INIS)

    Fischhoff, Maya E.

    2007-01-01

    The electricity industry's environmental impacts are a matter of acute interest to many outsiders, including government and environmental groups-and they have sought to affect those impacts through regulations, public pressure, and technical assistance. These approaches reflect outsiders' intuitive theories regarding the industry's goals, practices, and capabilities. The research reported here provides a systematic insiders' view on these processes, based on in-depth interviews with 70 middle managers in two electricity companies heavily reliant on coal. It finds managers sincerely committed to environmental action, but often frustrated by confusing regulatory requirements, perceived costs, and other challenges. It identifies ways of enabling middle managers to act on their commitment, with lessons relevant for outside groups and those within companies seeking to effect change

  9. Assessment and Improving Methods of Reliability Indices in Bakhtar Regional Electricity Company

    Directory of Open Access Journals (Sweden)

    Saeed Shahrezaei

    2013-04-01

    Full Text Available Reliability of a system is the ability of a system to do prospected duties in future and the probability of desirable operation for doing predetermined duties. Power system elements failures data are the main data of reliability assessment in the network. Determining antiseptic parameters is the goal of reliability assessment by using system history data. These parameters help to recognize week points of the system. In other words, the goal of reliability assessment is operation improving and decreasing of the failures and power outages. This paper is developed to assess reliability indices of Bakhtar Regional Electricity Company up to 1393 and the improving methods and their effects on the reliability indices in this network. DIgSILENT Power Factory software is employed for simulation. Simulation results show the positive effect of improving methods in reliability indices of Bakhtar Regional Electricity Company.

  10. Environmental Assessment: Gulf Power Company Military Point Transmission Line Project

    Science.gov (United States)

    2014-05-12

    1500.4. 1.4. 1 Geology No geological hazards, seismic risks, or unstable slopes occur in the vicinity of Military Point on Tyndall AFB. Therefore, the...with sand grout to fill any voids within the casing and provide thermal insulation for the electric cable. Lengths greater than 3,000 feet would be...devices designed to either insulate or isolate potential contact points have. been recommended to minimize the risk of eagle electrocution, which are

  11. Projected cost comparison of nuclear electricity

    International Nuclear Information System (INIS)

    Juhn, P.E.; Hu, C.W.

    2000-01-01

    Comparison of electricity generation costs has been done in the late years through a large co-operation between several organisations. The studies are aiming to provide reliable comparison of electricity generating costs of nuclear and conventional base load power plants. This paper includes the result of the joint IAEA/OECD study published in 1997. (author)

  12. Data envelopment analysis with uncertain data: An application for Iranian electricity distribution companies

    International Nuclear Information System (INIS)

    Sadjadi, S.J.; Omrani, H.

    2008-01-01

    This paper presents Data Envelopment Analysis (DEA) model with uncertain data for performance assessment of electricity distribution companies. During the past two decades, DEA has been widely used for benchmarking the electricity distribution companies. However, there is no study among many existing DEA approaches where the uncertainty in data is allowed and, at the same time, the distribution of the random data is permitted to be unknown. The proposed method of this paper develops a new DEA method with the consideration of uncertainty on output parameters. The method is based on the adaptation of recently developed robust optimization approaches proposed by Ben-Tal and Nemirovski [2000. Robust solutions of linear programming problems contaminated with uncertain data. Mathematical Programming 88, 411-421] and Bertsimas et al. [2004. Robust linear optimization under general norms. Operations Research Letters 32, 510-516]. The results are compared with an existing parametric Stochastic Frontier Analysis (SFA) using data from 38 electricity distribution companies in Iran to show the effects of the data uncertainties on the performance of DEA outputs. The results indicate that the robust DEA approach can be a relatively more reliable method for efficiency estimating and ranking strategies

  13. The Company Approach to Software Engineering Project Courses

    Science.gov (United States)

    Broman, D.; Sandahl, K.; Abu Baker, M.

    2012-01-01

    Teaching larger software engineering project courses at the end of a computing curriculum is a way for students to learn some aspects of real-world jobs in industry. Such courses, often referred to as capstone courses, are effective for learning how to apply the skills they have acquired in, for example, design, test, and configuration management.…

  14. French nuclear industry exportations: companies and organisations, achievements and projects

    International Nuclear Information System (INIS)

    Faudon, V.; Pailler, S.; Miniere, D.; Pouget-Abadie, X.; Journes, F.; Ouali, F.; Brochard, D.; Choho, T.; Lagarde, D.; Anglaret, P.; Kottman, G.; Mockly, D.; Ouzounian, G.; Cordier, P.Y.; Prenez, J.C.; Arpino, J.M.; Jaouen, C.; Jolly, B.

    2013-01-01

    This document gathers a series of short articles in which the following players: French Nuclear Safety Authority (ASN), Electricity of France (EdF), French Alternative Energies and Atomic Energy Commission (CEA), AREVA, ALSTOM, the Association of French Nuclear Industry Exporters (AIFEN), the National Radioactive Waste Management Agency (ANDRA) and the French Society of Nuclear Energy (SFEN) present their competencies in their respective fields and their strategies and commercial offers for exports. 2 articles are dedicated to the achievements of the French nuclear industry in China and another details the cooperation between SFEN and its foreign counterparts. Another article briefly presents the EPR and ATMEA reactors. (A.C.)

  15. Centralized vs. decentralized thermal IR inspection policy: experience from a major Brazilian electric power company

    Science.gov (United States)

    dos Santos, Laerte; da Costa Bortoni, Edson; Barbosa, Luiz C.; Araujo, Reyler A.

    2005-03-01

    Furnas Centrais Elétricas S.A is one of the greatest companies of the Brazilian electric power sector and a pioneer in using infrared thermography. In the early 70s, the maintenance policy used was a centralized approach, with only one inspection team to cover all the company"s facilities. In the early 90s, FURNAS decided to decentralize the thermography inspections creating several inspection teams. This new maintenance policy presented several advantages when compared to the previous one. However the credibility of the results obtained with the thermal inspection was frequently being questioned, in part due to the lack of a detailed planning to carry out the transition from the centralized inspection to the decentralized one. In some areas of the company it was suggested the inactivation of the thermography. This paper presents the experience of FURNAS with these different maintenance policies and details the procedures which have been taken that nowadays the infrared thermal inspection has become one of the most important techniques of predictive maintenance in the company.

  16. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  17. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  18. Survey and analysis of selected jointly owned large-scale electric utility storage projects

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    The objective of this study was to examine and document the issues surrounding the curtailment in commercialization of large-scale electric storage projects. It was sensed that if these issues could be uncovered, then efforts might be directed toward clearing away these barriers and allowing these technologies to penetrate the market to their maximum potential. Joint-ownership of these projects was seen as a possible solution to overcoming the major barriers, particularly economic barriers, of commercializaton. Therefore, discussions with partners involved in four pumped storage projects took place to identify the difficulties and advantages of joint-ownership agreements. The four plants surveyed included Yards Creek (Public Service Electric and Gas and Jersey Central Power and Light); Seneca (Pennsylvania Electric and Cleveland Electric Illuminating Company); Ludington (Consumers Power and Detroit Edison, and Bath County (Virginia Electric Power Company and Allegheny Power System, Inc.). Also investigated were several pumped storage projects which were never completed. These included Blue Ridge (American Electric Power); Cornwall (Consolidated Edison); Davis (Allegheny Power System, Inc.) and Kttatiny Mountain (General Public Utilities). Institutional, regulatory, technical, environmental, economic, and special issues at each project were investgated, and the conclusions relative to each issue are presented. The major barriers preventing the growth of energy storage are the high cost of these systems in times of extremely high cost of capital, diminishing load growth and regulatory influences which will not allow the building of large-scale storage systems due to environmental objections or other reasons. However, the future for energy storage looks viable despite difficult economic times for the utility industry. Joint-ownership can ease some of the economic hardships for utilites which demonstrate a need for energy storage.

  19. The effect of electric transmission constraints on how power generation companies bid in the Colombian electrical power market

    Directory of Open Access Journals (Sweden)

    Luis Eduardo Gallego Vega

    2010-05-01

    Full Text Available This paper presents the results of research about the effect of transmission constraints on both expected electrical energy to be dispatched and power generation companies’ bidding strategies in the Colombian electrical power market. The proposed model simulates the national transmission grid and economic dispatch by means of optimal power flows. The proposed methodology allows structural problems in the power market to be analyzed due to the exclusive effect of trans- mission constraints and the mixed effect of bidding strategies and transmission networks. A new set of variables is proposed for quantifying the impact of each generation company on system operating costs and the change in expected dispatched energy. A correlation analysis of these new variables is presented, revealing some interesting linearities in some generation companies’ bidding patterns.

  20. Key factors of project success in family small and medium-sized companies: the theoretical review

    Directory of Open Access Journals (Sweden)

    Sinisa Arsic

    2017-10-01

    Full Text Available The paper proposes a systematization of the key success factors of projects, through the theoretical review of family-owned companies operating in the EU market. It is the small and medium companies that in their own way contribute to the overall success of the national economy in terms of economic activity, increased employment, development activities and defining better business environment. The theoretical review observed numerous studies of family businesses, and the contribution of this work is in the systematization of the results of previous research – over three horizons, i.e., over the role of managers in the creation of successful projects (or owner if it is a family enterprise, institutional support for companies in Serbia and the EU, specific industries and the parent (regional markets where a family company operates. Project management, as a general representation of the concept of implementation of strategic and operational endeavors, contains many specifics in terms of critical success factors of projects depending on the environment in which they are implemented. The goal of the paper is reflected in the identification and presentation of critical success factors of projects implemented in family companies. The paper concludes with a discussion of the research results in relation to the existing, similar research studies, as well as with the announcement of future research, which will examine the conclusions drawn on a real sample.

  1. ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

    Energy Technology Data Exchange (ETDEWEB)

    GRAY BJ

    2007-11-26

    This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

  2. 2015 Plan. Project 4: electric power supply, hydro electrical potential

    International Nuclear Information System (INIS)

    1992-12-01

    This project describes the Brazilian hydroelectric park citing the historical aspects, methodology of potential evaluation, forecasts of costs for hydroelectric use and the utilization of hydroelectric potential in small and reversible hydroelectric plants situated in all Brazilian regions. The utilization of hydroelectric potential in Amazon region is put in relief. 8 figs, 17 tabs

  3. Assessing the financial positions of Ontario's new electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Connell, T. (Standard and Poor' s, Toronto, ON (Canada))

    1999-01-01

    This paper describes the methodology, including the criteria factors, comparable ratings and key credit issues used in assessing the financial positions of Ontario Power Generation Inc., and the Ontario Hydro Services Company. The rating criteria factors include both business factors (such as ownership structure, regulation, service area, operations, management, etc.,) and financial factors (e.g. financial policies and guidelines, recent financial performance, margin analysis, capital structure and borrowing plans, financial projections and sensitivities). Key credit issues include considerations of competitive dynamics, nuclear portfolio performance (for Genco), regulatory changes, cost control, capital spending program, retail business exposure, future financial performance. Comparisons are made with corresponding positions of comparable entities in Australia, Finland, New Zealand, the UK, and the USA. In the case of Ontario Power Generation Inc., the company is assessed to have significant advantages initially, but various uncertainties over the medium term warrant a more cautious view of the credit profile. For the Ontario Hydro Services Company the business risks appear to be low and moderate leverage entails a strong, stable credit profile. The overall assessment of the two companies is that while certain questions such as the workability and credibility of the new industry structure, the problem of stranded debt and questions about the liquidity of market participants remain unsolved, Ontario Power Generation Inc., and the Ontario Hydro Services Company ratings compare favorably with ratings of global industry peers.

  4. Assessing the financial positions of Ontario`s new electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Connell, T. [Standard and Poor`s, Toronto, ON (Canada)

    1999-11-01

    This paper describes the methodology, including the criteria factors, comparable ratings and key credit issues used in assessing the financial positions of Ontario Power Generation Inc., and the Ontario Hydro Services Company. The rating criteria factors include both business factors (such as ownership structure, regulation, service area, operations, management, etc.,) and financial factors (e.g. financial policies and guidelines, recent financial performance, margin analysis, capital structure and borrowing plans, financial projections and sensitivities). Key credit issues include considerations of competitive dynamics, nuclear portfolio performance (for Genco), regulatory changes, cost control, capital spending program, retail business exposure, future financial performance. Comparisons are made with corresponding positions of comparable entities in Australia, Finland, New Zealand, the UK, and the USA. In the case of Ontario Power Generation Inc., the company is assessed to have significant advantages initially, but various uncertainties over the medium term warrant a more cautious view of the credit profile. For the Ontario Hydro Services Company the business risks appear to be low and moderate leverage entails a strong, stable credit profile. The overall assessment of the two companies is that while certain questions such as the workability and credibility of the new industry structure, the problem of stranded debt and questions about the liquidity of market participants remain unsolved, Ontario Power Generation Inc., and the Ontario Hydro Services Company ratings compare favorably with ratings of global industry peers.

  5. DIFFICULTIES ENCOUNTERED IN ISO 9001:2008 IMPLEMENTATION PROJECTS IN INCUBATED TECHNOLOGY-BASED COMPANIES

    Directory of Open Access Journals (Sweden)

    Eduardo Gome Salgado

    2014-09-01

    Full Text Available Quality Management Systems (QMS are designed to continuously improve the performance of organizations aiming to constantly improve their services seeking to overcome their results. Thus, for the services and/or products offered to transmit confidence and credibility, they should be designed within appropriate norms and standards. This research aims to assess the difficulties encountered by the incubated companies participating in the PRIME-FINEP project and developing projects for certification of their QMS in accordance with ISO 9001:2008. An exploratory survey was performed in nine incubated technology-based companies (TBC, through a questionnaire with 21 questions totaling the opinion of 20 respondents. After analyzing the data it is concluded, with statistical meaning, that the TBC's with little incubation time present difficulties in implementing the quality policy (5.3, difficulty not identified in other studies conducted in large companies. However difficulties similar to those of the large companies are present in the incubated TBC, and are the following: documentation requirements (4.2 present in all incubated companies (regardless of incubation time, and design and development (7.3 present in companies with little incubation time. The difficulty in implementing the quality policy (5.3 is reflected in the achievement of the QMS certification project in accordance with ISO 9001:2008.

  6. Green marketing in the Massachusetts electric company retail competition pilot program

    Energy Technology Data Exchange (ETDEWEB)

    Rothstein, S.M.; Fang, J.M.

    1997-10-01

    With electric industry restructuring initiatives being introduced on the state and federal levels, retail access pilot programs serve an important function for examining competitive market issues, as well as marketing strategies and customer reactions to different power supply options. The experience gained through these pilots provides important insights into future power market operations, including the market for green power. The Massachusetts Electric Company`s (MECo`s) Choice: New England pilot for residential and small-business customers was a voluntary program developed primarily to test the billing and metering logistics that distribution companies will need in the competitive market. The pilot also offered a preview of program implementation and marketing under customer choice. It was the first retail competition pilot to explicitly include green power options in program design. The MECo pilot`s energy suppliers were selected through the issuance of a request for proposals (RFP). Respondents were asked to submit bids in one or more of three energy supply categories-price, green, and other options. These options were developed by the pilot administrator through internal meetings, discussions with state officials and other stakeholders, and a review of information from other similar pilots. For the green option, the pilot administrator did not establish a green standard. Instead, suppliers were allowed to submit offers that promoted environmental stewardship. Customer response to the different green options are reported. The pilot results clearly demonstrate that, in a competitive situation, there is interest in a variety of energy supply options, including green options. 2 tabs.

  7. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  8. Estimating customer electricity savings from projects installed by the U.S. ESCO industry

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo, Juan Pablo [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); Larsen, Peter H. [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)

    2014-11-25

    The U.S. energy service company (ESCO) industry has a well-established track record of delivering substantial energy and dollar savings in the public and institutional facilities sector, typically through the use of energy savings performance contracts (ESPC) (Larsen et al. 2012; Goldman et al. 2005; Hopper et al. 2005, Stuart et al. 2013). This ~$6.4 billion industry, which is expected to grow significantly over the next five years, may play an important role in achieving demand-side energy efficiency under local/state/federal environmental policy goals. To date, there has been little or no research in the public domain to estimate electricity savings for the entire U.S. ESCO industry. Estimating these savings levels is a foundational step in order to determine total avoided greenhouse gas (GHG) emissions from demand-side energy efficiency measures installed by U.S. ESCOs. We introduce a method to estimate the total amount of electricity saved by projects implemented by the U.S. ESCO industry using the Lawrence Berkeley National Laboratory (LBNL) /National Association of Energy Service Companies (NAESCO) database of projects and LBNL’s biennial industry survey. We report two metrics: incremental electricity savings and savings from ESCO projects that are active in a given year (e.g., 2012). Overall, we estimate that in 2012 active U.S. ESCO industry projects generated about 34 TWh of electricity savings—15 TWh of these electricity savings were for MUSH market customers who did not rely on utility customer-funded energy efficiency programs (see Figure 1). This analysis shows that almost two-thirds of 2012 electricity savings in municipal, local and state government facilities, universities/colleges, K-12 schools, and healthcare facilities (i.e., the so-called “MUSH” market) were not supported by a utility customer-funded energy efficiency program.

  9. Environmental Disclosure of Electric Power Companies Listed in the Corporate Sustainability Index (CSI

    Directory of Open Access Journals (Sweden)

    Clésia Ana Gubiani

    2012-12-01

    Full Text Available The study aimed to verify the level of disclosure of environmental information in the administration reports of the energy companies listed in the Corporate Sustainability Index (CSI. A descriptive and quantitative research was done, using the content analysis technique on the administration reports from 2006 to 2008. The sample consisted of 11 electric power companies listed in the CSI. For quantitative analysis of the disclosure index, the data collection instrument was based on the study of Rover, Murcia and Borba (2008, which proposes eight environmental categories and 36 subcategories. For the whole analysis of the data were elaborated networks of the items disclosed in each company, using the software UNICET ®. The survey results showed that there is satisfactory disclosure in the categories of environmental policies and education, training and research environment. However, it was found that there is need for greater disclosure of categories of products impacts and processes in the environment, power polices and financial environmental information. It was concluded that the information disclosed in the administration reports of the companies surveyed about the environmental information do not respect the principle of full disclosure.

  10. Activities of electric utilities in alternative energy projects

    International Nuclear Information System (INIS)

    Silva, D.B. da; Reis Neto, J.L. dos

    1990-01-01

    Since oil crisis, in 1973 and 1979, some electrical utilities in Brazil begun investments in alternative projects for example production of electrolytic hydrogen, peats with energetics goals, steam from electric boiler, and methanol from wood gasification. With oil substitution goals, these projects have not success actually, after attenuated the crisis. However, the results acquired is experience for the development of the brazilian energy patterns. (author)

  11. Electric Vehicle Fleet Integration in the Danish EDISON Project

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Træholt, Chresten; Marra, Francesco

    2010-01-01

    The Danish EDISON project has been launched to investigate how a large fleet of electric vehicles (EVs) can be integrated in a way that supports the electric grid while benefitting both the individual car owners and society as a whole through reductions in CO2 emissions. The consortium partners...

  12. Causes of project implementation delay in the Ethiopian Electric ...

    African Journals Online (AJOL)

    This study identifies the major sources of delay in the implementation of construction projects in the Ethiopian electric utility enterprise. It also investigates the magnitude of schedule variance and cost overrun experienced by the Universal Electric Access Program (UEAP)due to implementation delay. Primary data were ...

  13. DSM energy saving pilot project report. Company Augstceltne Ltd., Riga, Latvia

    Energy Technology Data Exchange (ETDEWEB)

    Krievins, P.; Cakuls, A.; Kaross, V.; Jansons, D.

    1995-05-01

    This report is a part of the Joint Latvian - Danish Project DEMAND SIDE MANAGEMENT AND ENERGY SAVING. The Project is a part of the Danish aid and technology transfer to Latvia. It is the result of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and a Danish team, which was represented by Danish Power Consult. The purpose of this pilot project was not only to carry out energy audit in the company Augstceltne Ltd and propose demand side management and energy saving measures. Another task of the project was the application of DPC energy audit methodic, measuring equipment and software in Latvian conditions and the promotion of energy saving programs in Latvia in this way. The Company Augstceltne Ltd was created to rent the rest of premises for many other independent companys and to earn money for surviving. Now the Company has 9 buildings with a total area of 26,920 square meters. The tower block has 23 floors and it is the main business centre. 66 companies are located in the building. (EG)

  14. Handling of Environmental Related Requirements : Awareness and Ability to Act at Small and Medium Sized Electric and Electronic Companies

    OpenAIRE

    Lin, Han-Hsuan

    2008-01-01

    Environmental related product requirements are increasing worldwide from government authorities, customers and other stakeholders. For small and medium sized companies manufacturing electric and electronic products it is more difficult compared to bigger companies to meet new product related requirements due to smaller budget, resources and knowledge. This research studies the awareness and ability to act upon changes when small and medium sized companies in Sweden face environmental related ...

  15. Evaluating experience with electricity generating GHG mitigation projects

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, J.

    2003-07-01

    Several programmes have been initiated to encourage the development of projects that mitigate emissions of greenhouse gases. Recent programmes have been undertaken at the national level, such as the Dutch five-track approach, including contracts with multilateral institutions, regional development banks, private banks, bilateral contracts with countries, participation in carbon funds and the ERUPT and CERUPT tenders, Japanese Clean Development Mechanism (CDM) feasibility studies, and the more recent Finnish, Austrian and Italian JI/CDM programmes. International programmes, such as the World Bank's Prototype Carbon Fund (and other WB carbon funds), have also been initiated. Individual projects not belonging to particular programmes have also been initiated under the pilot phase of 'activities implemented jointly' (AIJ) under the United Nations Framework Convention on Climate Change (UNFCCC), or developed as CDM or Joint Implementation (JI) projects. Some CDM project activities have been formally submitted to the CDM's Executive Board (EB), who approved the first set of baseline and monitoring methodologies for CDM project activities in July 2003. There is a large variety in the type of projects that have been put forward. These include energy, industry, forestry and waste projects. This paper will focus on CDM-type projects that generate grid-connected electricity for several reasons: demand for electricity is growing rapidly in many potential host countries; many projects in the electricity sector have been developed as potential CDM and JI projects; assessing additionality and baselines is arguably more difficult for projects in the electricity sector (where a range of project types may occur as part of business-as-usual activities) than for end-of-pipe projects such as landfill gas capture and flaring or decomposition of F-gases; much work has been done on assessing appropriate methods to determine baselines in the electricity sector, at the

  16. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Science.gov (United States)

    2011-10-26

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2011-0247] Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant... Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee), for...

  17. Resolution 139/012. It authorize to RIO MIRADOR S.A company to generate a wind electricity source by a generating plant located in Maldonado town 5a. Catastral section, as well as the connection to the Interconnected National System

    International Nuclear Information System (INIS)

    2013-01-01

    This Resolution authorizes the generation of electricity using wind energy as the primary electricity source. This project was presented by RIO MIRADOR S.A wind generation company with the proposal to instal an electrical plant in Maldonado town. This authorization is according to the Electric Wholesale Market regulation

  18. Did a local distribution company procure prudently during the California electricity crisis?

    International Nuclear Information System (INIS)

    Woo, C.-K.; Lloyd, Debra; Clayton, William

    2006-01-01

    To manage cost risk, prudent procurement of electric power requires that some portion of a buyer's energy demand be met through long-term contracting. Under cost-of-service regulation or performance-based regulation, a local distribution company (LDC) should be allowed to fully recover all prudently incurred power procurement costs. However, the regulatory test of prudence is an ex post review with the threat of disallowance. This paper presents an economic analysis of procurement prudence involving a small LDC, Bear Valley Electric Service (BVES), which serves a resort area in Southern California. The key findings are: (a) high and volatile prices and rolling blackouts characterized the market environment faced by the owner of BVES, Southern California Water Company (SCWC), at its signing of a 5-year fixed price contract; (b) SCWC was a price-taker with no incentive to act imprudently; (c) the contract was obtained via a competitive bidding process; (d) the contract price was comparable to the benchmark price of contemporaneous contracts; (e) the fixed price contract was economic when compared to available alternatives; and (f) despite (a)-(e), a negotiated settlement with the state regulator and a large user resulted in substantial disallowance. The policy implication is that a regulator should approve a prudent procurement plan proposed by an LDC to remove the unreasonable risk of an ex post review. If the LDC strictly adheres to the plan, the resulting electricity purchases are per se prudent and should entitle the LDC to full cost recovery

  19. The French Electricity Company (EDF) and the environment. Press file for 1996

    International Nuclear Information System (INIS)

    Bourdier, Jean-Pierre

    1997-01-01

    In 1996 the actions of EDF in the domain of environment have recorded FF 4 billions (FF 3.5 billion in 1995), representing about 2% of the EDF's turnover. The EDF keeps on its efforts for reducing the impact of its activities upon environment. Several applications of an environment protective electricity generation are promoted by the company. The company brings services and technical solutions to its clients which meet their energy needs and conserving at the same time the life conditions. Furthermore, EDF participates in the activity of numerous national and international organisms, intervening in the environmental questions, in decision making, participating in studies and actions and following continually the direction of a durable economic and social development. The report is structured in three chapters: 1. an industrial responsibility; 2. services and techniques for environment; 3. action towards a durable development

  20. The French Electricity Company (EDF) and GEC ALSTHOM have signed the agreement for Chinese Laibin B electric power plant

    International Nuclear Information System (INIS)

    1997-01-01

    EDF and GEC ALSTHOM together with the government of Chinese Province Guangxi have organized in Pekin on 3 september 1997 a ceremony for signing a BOOT (Build, Own, Operate, Transfer) contract for the Coal Power Plant (2 x 360 MW) at Laibin B. This is the first Chinese BOOT contract in the power domain entirely financed by foreign capital. The two western companies which were retained for this project, following an international call for offers, invest USD 150 million of its own founds in this USD 600 million project. They will hold 60% and 40% of the capital of the company created for this project, respectively. The construction power plant is planned to be completed at the end of 1999 - beginning of 2000. After 15 years of industrial operation the power plant will be transferred to the autonomous government of the Province Guangxi. The communique contains the following 8 files: 1. The Laibin B power plant; 2. Build, Own, Operate, Transfer; 3. The autonomous Guangxi Province; 4. An outline of EDF in China; 5. Profile/activities of GEC ALSTHOM in China; 6. The 'Credit Agricole Indosuez' in China; 7. BZW Barclays PLC; 8. HSBC Investment Banking in China

  1. Plan 2000. The electricity companies plan for electricity conservation in the millennium; Plan 2000. Elselskabernes plan for elbesparelser i det nye aartusinde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-01

    Plan 2000 presents an account of the activities in the years 1997 and 1998 and a budget for the year 2000 and forwards. The report includes all 82 electricity companies in Denmark. Furthermore a number of particular analyses of relevance to electricity conservation are presented. All electricity companies work to promote electricity conservation. All consumption sizes and sections are covered. The activities in the individual companies are supported by a number of common campaigns. In Plan 2000 those activities are presented and the economics is analysed. The activities in the first year of the plan are expected to result in conservation corresponding 4% of the present electricity consumption. 80% of the conservation comes from activities, which are measurable. Technical counselling of trade customers is one of the essential activities. Others are e.g. telephone counselling, theme arrangements and teaching of pupils. (EHS)

  2. The adaptation of the electric power companies to the power market

    International Nuclear Information System (INIS)

    Otterstad, B.; Ottosen, R.

    1993-02-01

    This report describes the challenges met by the Norwegian electric power companies in adapting to a more market oriented business and their possibilities and strategies when facing the uncertainties on the market side. The main principles of adaptation to the market are described and various strategies are illustrated by means of simple calculations and figures. The theoretical basis for analyses of adaptation to the market and for pricing period contracts and options are discussed. The report concludes with a discussion of the de-regulation of the North American gas market and draws parallels to the Norwegian power market. 17 figs

  3. How the largest electric and gas utility companies administer public relations

    Energy Technology Data Exchange (ETDEWEB)

    Bogart, J.D.

    1979-04-12

    This article describes the findings of a survey conducted by the author in the second half of 1978 to determine the sizes of the public relations staffs of the nation's largest operating electric and gas utilities, their budgets, organizational differences, and specific functions. Common public relations issues and major public relations problems of the utilities are identified, as well as recent trends or changes in budgeting and organization. Some functional variations of public relations departments among utility companies were detected and described.

  4. Project Circuits in a Basic Electric Circuits Course

    Science.gov (United States)

    Becker, James P.; Plumb, Carolyn; Revia, Richard A.

    2014-01-01

    The use of project circuits (a photoplethysmograph circuit and a simple audio amplifier), introduced in a sophomore-level electric circuits course utilizing active learning and inquiry-based methods, is described. The development of the project circuits was initiated to promote enhanced engagement and deeper understanding of course content among…

  5. Development on power distribution technologies of four electric power companies in Japan. The Tokyo Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Electric power companies have been needed to cope with various needs in accordance with the progress of highly information-oriented society, the improvement of industrial technology, and the advancement and diversification of the living environment. In such situation, the power distribution section of Tokyo Electric Power has promoted technical development, setting up following priority items to put into operation: to reduce power failure caused by works and accidents, to improve reliability in supply, to reduce costs of construction and all over business management, to serve customers to answer various needs, to develop new technology and new methods based on the medium- and long-term prospect, and so forth. Several examples of recent technical development are introduced here. They are as follows; compact equipment and materials for electric poles to match the circumstances of cities and to simplify the construction method for power distribution, a 750kVA large high-voltage power-generation truck to make provision against an emergency such as a disaster by a typhoon, a compact transformer used on the ground, a high-voltage automatic cabinet, and a detector to find the failure of indoor power distribution works in resistances in a short time. 8 figs.

  6. Project management as a competitive advantage for the internationalization of Brazilian companies

    Directory of Open Access Journals (Sweden)

    Andre Luiz Spinelli Schelini

    2017-12-01

    Full Text Available This study focuses on three theoretical axes: project management (PM, internationalization of companies and the resource-based view (RBV. It aimed to analyze if, and in what way, PM maturity contributes to the international strategy of Brazilian companies from the RBV perspective. The research strategy adopted in three Brazilian companies constituted a multiple case study with a descriptive exploratory approach through intercase and intracase analysis. As an unprecedented result, the study identified five characteristics of mature project management: project sustainability, stakeholder engagement, goal setting and strategy, change management, and risk management. Furthermore, all of these contributed to the internationalization of the companies in question, with an impact on competitive advantage, considering the RBV-VRIO analysis. Thus, the study contributes to the field by aiding companies that are beginning or intend to begin internationalization processes, enabling them to obtain better results through PM. A limitation of the study is the small number of cases investigated, which may be viewed as an opportunity for conducting further studies.

  7. Development of management systems for nuclear power plant of Hokuriku Electric Power Company

    International Nuclear Information System (INIS)

    Nakamura, Tatsuaki; Hasunuma, Junichi; Suzuki, Shintaro

    2009-01-01

    Hokuriku Electric Power Company has been operating the Shika Nuclear Power Station that it constructed in Shika city, Ishikawa prefecture, for over 15 years since bringing Unit 1 of this plant online in July 1993. In addition to electricity generation, maintenance and inspection tasks constitute a big part of operating a large-scale nuclear power plant, and in recent years, problems at power stations in the nuclear power industry have led to several revisions of nationally regulated maintenance and inspection systems. This paper describes the background, objectives, development method, and features of the Maintenance Management System and Maintenance History Management System that make effective use of information technology to promote safer and more efficient maintenance work at large-scale nuclear power plants. (author)

  8. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Chikeung Woo; Karimov, R.I.; Horowitz, I.

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of ''What to buy?'' and ''How to buy?'' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase. (author)

  9. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Woo, C.-K.; Karimov, R.I.; Horowitz, Ira

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of 'What to buy?' and 'How to buy?' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase

  10. Electricity generation projections of the world and Brazil

    International Nuclear Information System (INIS)

    Dias, Marcio Soares

    2002-01-01

    The world use of electricity is projected to increase by 9,570 billions kWh over a span of 20 years. Natural gas is expected to account for the largest increment in electricity generation. As a result of high oil and natural gas consumption fuel prices are projected to rise in nominal dollars over the forecast horizon. Higher capacity utilisation and fewer expected retirements of running nuclear plants have resulted in a revision of EIA's projected consumption of electricity from nuclear power. Projection of 3.6%/year in the electricity consumption in Brazil is lower than the historical correlation given by the GDP (5%) growth rate plus 1.2 to 1.7%. GDP and energy consumption growth rates for Brazil are projected to be higher than the world value, but are lower than the projected values for countries like Mexico and China. Trends in primary fuel prices and external dependence on fuel supply are important factors for the Brazilian investments on electricity generation due their impact on costs and standard of living. (author)

  11. The Electric Vehicle Project for High School Students in Nagoya City Science Museum : As the First Step of Global Engineering Education to Create Value from Knowledge

    OpenAIRE

    馬渕, 浩一; Mabuchi, Koichi

    2014-01-01

    This paper gives an account of "The Electric Vehicle Project", a science museum activity in cooperation with Nagoya Institute of Technology and major manufacturing companies. The project is intended to encourage Japanese high school students' interest in science and technology, based on Nagoya, Japan and Asia, the center of the manufacturing industries. The project contains three programs: 1) Students make practical lead acid batteries. 2) Students drive an electric vehicle of their own desig...

  12. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-12-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... authorizes operation of the H.B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among...

  13. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-03-11

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... of the H. B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among other things...

  14. Using accounting information systems by operations managers in a project company

    NARCIS (Netherlands)

    Wouters, Marc; van der Veeken, Henk J.M.

    2002-01-01

    This paper describes the results of a case study that investigated the use of accounting information by operations managers in a road building company. There was considerable preplanning before the execution of project activities, but task uncertainty during execution created the need to take

  15. Scoping a Product Configuration Project for Engineer-to-Order Companies

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Bonev, Martin

    2014-01-01

    When implementing a product configuration system in a company making complex and highly engineered products, many decisions need to be made in the early phases of the project. This article presents a framework for supporting the initial scoping process and discusses experiences from applying...

  16. Investment Cost Model in Business Process Intelligence in Banking And Electricity Company

    Directory of Open Access Journals (Sweden)

    Arta Moro Sundjaja

    2016-06-01

    Full Text Available Higher demand from the top management in measuring business process performance causes the incremental implementation of BPM and BI in the enterprise. The problem faced by top managements is how to integrate their data from all system used to support the business and process the data become information that able to support the decision-making processes. Our literature review elaborates several implementations of BPI on companies in Australia and Germany, challenges faced by organizations in developing BPI solution in their organizations and some cost model to calculate the investment of BPI solutions. This paper shows the success in BPI application of banks and assurance companies in German and electricity work in Australia aims to give a vision about the importance of BPI application. Many challenges in BPI application of companies in German and Australia, BPI solution, and data warehouse design development have been discussed to add insight in future BPI development. And the last is an explanation about how to analyze cost associated with BPI solution investment.

  17. Successful diversification strategies of electricity companies: An explorative empirical study on the success of different diversification strategies of German electricity companies in the wake of the European market liberalization

    International Nuclear Information System (INIS)

    Mueller, Ralf; Steinert, Martin; Teufel, Stephanie

    2008-01-01

    Based on the EC directive 96/92, the liberalization of electricity markets is forcing electricity companies, to rethink their product and market strategy. However, neither the level of the initiated diversification efforts of former monopolies, nor their direction or their success are known or have been analyzed before. Therefore, Mueller [2006. Diversifikationsstrategien von Stromversorgungsunternehmen: Handlungsempfehlungen fuer schweizerische Stromversorgungsunternehmen auf der Basis einer empirischen Analyse des liberalisierten deutschen Strommarktes. IIMT University Press, Fribourg] has quantitatively determined the extent and direction of the diversification efforts in the electricity sector. Additionally, based on an exploratory case study research, successful diversification strategies have been identified and incorporated into 73 observations which form the basis of a set of normative recommendations for diversifying electricity companies. Since the analyses are based on the German electricity market, which fully liberalized earlier than most of its continental European counterparts, the results may especially guide other European electricity companies in their strategic diversification decisions. This paper publishes both the quantitative analysis on the degree and extents of diversification (sample time frame 1995-2000) as well as the qualitative analysis on the success of diversification strategies (sample time frame 1995-2003). Additionally, based on the obtained explorative observations, the diversification strategy of an idealized-electricity company is firstly presented for practitioners as normative recommendation, and secondly for academics, as starting point for future quantitative analysis framework. (author)

  18. Attitudes of the general public and electric power company employees toward nuclear power generation

    International Nuclear Information System (INIS)

    Komiyama, Hisashi

    1997-01-01

    We conducted an awareness survey targeted at members of the general public residing in urban areas and in areas scheduled for construction of nuclear power plants as well as employees of electric power company in order to determine the awareness and attitude structures of people residing near scheduled construction sites of nuclear power plants with respect to nuclear power generation, and to examine ways of making improvements in terms of promoting nuclear power plant construction sites. Analysis of those results revealed that there are no significant differences in the awareness and attitudes of people residing in urban areas and in areas near scheduled construction sites. On the contrary, a general sense of apprehension regarding the construction of nuclear power plants was observed common to both groups. In addition, significant differences in awareness and attitudes with respect to various factors were determined to exist between members of the general public residing in urban areas and scheduled construction sites and employees of electric power company. (author)

  19. TAX TREATMENT OF CARBON CREDIT OPERATIONS IN BRAZILIAN COMPANIES WITH CDM PROJECTS

    Directory of Open Access Journals (Sweden)

    Vanderlei dos Santos

    2012-06-01

    Full Text Available The aim in this study is to identify the tax treatment applied to carbon credit operations in Brazilian companies that are developing projects in the context of the Clean Development Mechanism (CDM. Therefore, an exploratory research with a qualitative approach was developed. Data were collected with the help of questionnaire, forwarded to all Brazilian companies with CDM projects that received approval from the Inter-Ministerial Commission on Global Climate Change (CIMGC without safeguards, according to the list of the Brazilian Ministry of Science and Technology. Out of 117 companies listed, only five answered the research instrument, which represents an accessibility sample. The results show that, as for the tax treatment applied in the companies under analysis, IRPJ and CSLL should be charged on carbon credit operations. Regarding PIS, COFINS, ISS, some companies considered that these taxes are due and others that they are not. There is a consensus, though, about the fact that ICMS and IOF should not be charged. In conclusion, no uniform understanding exists as of yet about due taxes in the research sample, as no specific fiscal legislation exists yet on carbon credits in Brazil.

  20. Stimuli of Collaboration in Product Development: A Case Study in a Project Manufacturing Company

    Directory of Open Access Journals (Sweden)

    Jääskeläinen Aki

    2017-12-01

    Full Text Available There is already a wide acceptance on the importance of involving supplier and customer companies in product development. Decent understanding prevails on the relationship-oriented approach to product development including various collaboration forms. However, there is less research on the factors explaining the decision of attending to joint product development. In addition, less studies have examined the integrated role of both suppliers and customers in product development initiatives. This study searches answers to the following research questions: 1. What is the role of different actors in product development initiatives? 2. What factors motivate suppliers and customers to participate in product development? The research is carried out as an in-depth qualitative single case study in a large project manufacturing company. It takes the perspective of a focal company striving for product improvements. The first part of the empirical study consists of 15 semi-structured interviews. The second part includes two discursive workshops and builds upon the results of the interviews. This study contributes to the existing research by explaining the challenges and conditions facilitating joint product development with supplier and purchaser companies. The results highlight the role of customers in improving the effectiveness of product development. As a practical contribution, the paper reports the application of workshop method as a facilitator of collaboration between supplier, purchaser (focal company and customer companies.

  1. Projected costs of generating electricity - 2005 update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut 'winner'. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. 24 figs., 38 tabs., 11 apps.

  2. Do distribution companies loose money with an electricity flexible tariff?: A review of the Chilean case

    International Nuclear Information System (INIS)

    Vera, Sonia; Bernal, Felipe; Sauma, Enzo

    2013-01-01

    We can get an (energy efficiency) EE improvement if we produce a flatter daily load curve, leading to a higher efficiency of the power system, making better use of the generation and transport electricity chain, thus avoiding over-investment in equipment used just few hours a year. Tariff flexibility of the (Time of Use) TOU type is one of these measures. Generally, TOU systems are designed to minimize total system cost, which may cause losses in distribution companies (DISCOs), generating opposition. On the contrary, the present paper proposes a TOU system for electricity consumption in Chile where optimal prices are obtained in order to maximize total income of DISCOs. In this manner, the proposed TOU system is, by definition, beneficial for DISCOs and it may lead to a win–win situation among DISCOs and consumers. In particular, we show that such a system, implemented in a country like Chile, would allow for DISCOs a total potential benefit of 811.7 millions of dollars for the 3-year study period (2005–2007), considering initiatives that promote a 5% savings in real consumption during on-peak hours, obtained by the spread or difference between the proposed and the current systems. - Highlights: • We propose a TOU (Time of Use) system for electricity consumption in Chile. • In this system the optimal prices are obtained in order to maximize total income of (distribution companies) DISCOs. • The proposed TOU system may lead to a win–win situation among DISCOs and consumers. • This system, implemented in a country like Chile, would allow for DISCOs a total potential benefit of M$811.7. • Benefit obtained for 3-year study period with initiatives that promote 5% savings in real consumption during on-peak hours

  3. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments

  4. Long-term projections for electricity and gas prices

    International Nuclear Information System (INIS)

    Borggrefe, Frieder; Lochner, Stefan

    2009-01-01

    The article analyses potential developments of wholesale electricity prices in Germany until 2030. The relevant determinants and their effects on prices are shown. Several projections demonstrate the impact of future fuel prices taking the political framework into account. The importance of carbon and gas prices - and the latter's relationship to oil prices - are discussed extensively. Although forecasting electricity prices is associated with great uncertainties, the article illustrates the relative impacts of the various price determinants and their interactions. (orig.)

  5. Impact of Leadership Styles on Project Success – The Case of a Multinational Company

    Directory of Open Access Journals (Sweden)

    Bálint Blaskovics

    2014-11-01

    Full Text Available Literature on project success mainly focused on identifying and analyzing success criteria and critical success factors. Success criteria are used for evaluating the success of a project and critical success factors are those factors which increase the potential for achieving project success. However, the interrelationships among them were rarely analyzed, although researchers highlighted the importance of these interrelationships. The aim of the paper is to identify a leadership style, of which project managers can maximize the potential for achieving project success. Project success is analyzed from the point of view of success criteria. This approach manages the shortcoming mentioned above, the lack of analyzing interrelationships among critical success factors and success criteria. This outcome is drawn from qualitative field research at a subsidiary of a Scandinavian-based multinational company.

  6. MEASUREMENT PROCESS OF SOFTWARE DEVELOPMENT PROJECTS FOR SUPPORTING STRATEGIC BUSINESS OBJECTIVES IN SOFTWARE DEVELOPING COMPANIES

    Directory of Open Access Journals (Sweden)

    Sandra Lais Pedroso

    2013-08-01

    Full Text Available Software developing companies work in a competitive market and are often challenged to make business decisions with impact on competitiveness. Models accessing maturity for software development processes quality, such as CMMI and MPS-BR, comprise process measurements systems (PMS. However, these models are not necessarily suitable to support business decisions, neither to achieve strategic goals. The objective of this work is to analyze how the PMS of software development projects could support business strategies for software developing companies. Results taken from this work show that PMS results from maturity models for software processes can be suited to help evaluating operating capabilities and supporting strategic business decisions.

  7. How to Scope a Product Configuration Project in an Engineering Company

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Bonev, Martin

    2014-01-01

    When implementing a product configuration system in a company making complex and highly engineered products, many decisions need to be made in the early phases of the project. This article presents a framework for supporting the initial scoping process and discusses experiences from applying...... the framework in an engineering company. The framework covers a number of topics, such as identifying the users of the configuration system, prioritizing the user requirements, defining the input and output, and the overall functionality of the configuration system. Furthermore, the scoping process considers...

  8. The roles played by the Canadian General Electric Company's Atomic Power Department in Canada's nuclear power program: work, organization and success in APD, 1955-1995

    International Nuclear Information System (INIS)

    Cantello, G.W.

    2003-01-01

    This thesis explores the roles played by the Canadian General Electric Company's Atomic Power Department (APD) in Canada's distinctive nuclear power program. From the establishment of APD in 1955 until the completion of the KANUPP project in Pakistan in 1972, the company's strategy encompassed the design, manufacture, and commissioning of entire nuclear power projects in Canada and abroad. APD then developed a specialized role in the design and supply of complete nuclear fuel handling systems, nuclear fuel bundles, and service work, that sustained a thriving workplace. Five key factors are identified as the reasons behind the long and successful history of the department: (1) Strong, capable and efficient management from the start, (2) Flexible organizational structure, (3) Extremely competent design group, (4) Excellent manufacturing, test, commissioning and service capabilities, (5) Correctly identifying, at the right time, the best fields in which to specialize. (author)

  9. Basic survey project for Joint Implementation, etc. Blast furnace top pressure recovery turbine (TRT) project (Panzhihua Iron and Steel (Group) Company, People's Republic of China)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a feasibility study was conducted on the energy conservation at Panzhihua Iron and Steel Company in Sichuan Province, China. In this project, the pressure energy of blast furnace is to be recovered in the form of electric power by installing the blast furnace top pressure recovery turbine (TRT). In the project, the pressure-reducing valve was removed, and the dry dust collector/dry TRT were installed to make the scale of electric power production largest. A model of TRT was installed at No. 4 blast furnace and is now in operation. In this project, TRTs are to be installed at Nos. 1, 2 and 3 blast furnaces. As a result of the study, the investment totaled 5.46 billion yen. The capacity of power generation by TRT is 16,890 kW, and the generated output is 137,822 MWh/y. Moreover, the amount of energy conservation is 36,467 toe/y, and the reduction amount of greenhouse effect gas emissions is 112,830 CO2-ton/y. The term of investment recovery is 8.3 years. The effect of reduction in greenhouse effect gas emissions is 20.66 CO2-ton/y/million yen. (NEDO)

  10. Change of the layout of an office of a metallurgical company: simple projects, big solutions.

    Science.gov (United States)

    Duarte, Luiz Carlos da Silva; Eckhardt, Moacir; da Motta, Giordano Paulo

    2012-01-01

    The posture, a good organization and the proper layout of the environment and workplaces have a positive influence on the income of an employee. To develop the work it is used a methodology that addressed the study phases of the theory involving the subject, description of the current situation, preparation of conceptions, choice of design, implementation and reporting of results. Through the project of "Change of the layout of an office of a metallurgical company" there was an intervention in these reported aspects providing improvements in the office, regarding ergonomic, layout, workplace and lighting issues, bringing welfare to the official, with the intent to improve its performance within the company and facilitating its actions, as the company's customer service. The results provided improvements in layout, in the workplace and especially in comfort for the human resources that perform their activities.

  11. POSSIBILITIES OF APPLYING THE DEA METHOD IN THE ASSESSMENT OF EFFICIENCY OF COMPANIES IN THE ELECTRIC POWER INDUSTRY: REVIEW OF WIND ENERGY COMPANIES

    Directory of Open Access Journals (Sweden)

    Dario Maradin

    2014-07-01

    Full Text Available One of the fundamental tasks of modern power system is finding ways to produce stable and continuous electricity from scarce energy resources. One of the possible solutions is introduction, implementation and improvement of alternative forms of energy such as renewable energy sources, particularly wind energy as an increasingly important energy source which is expected to further increase its share in total electricity production. Numerous methods can be used in assessing the efficiency of wind energy companies, and in the focus of this research is the Data Envelopment Analysis method (DEA, a widely accepted methodology given its interdisciplinary approach and flexibility. This method represents a step forward in the field of renewable energy management, because it provides the possibility to compare the selected companies with the best in the industry (the most efficient and the possibility of determining sources of inefficiency and, consequently, the possibilities of their elimination.

  12. Project finance and its limitations in terms of difficult political and structural horizons - the case of electricity generation

    International Nuclear Information System (INIS)

    Fiancette, Georges; Penz, Philippe

    1994-01-01

    Illustrations are given of the kinds of difficulties attendant on the project financing of electricity generation in some developing countries and former socialist countries of Eastern Europe. There are risks due to the instability of the legal framework because of political considerations and also because the organization and regulation of the electricity supply industry is still being developed. Problems may arise because of the gap between the relatively short term of the repayable debt (10 to 12 years) and the lifetime of a typical project (of the order of 30 years). Project investment is usually entrusted to an independent body which often relies on the local electricity company to operate the power station. In this situation, the two bodies involved cannot mutually insure the risks. Exchange rates generate problems associated with convertibility on the one hand and fluctuations on the other. The particular problems which occur in the project financing of power station restoration are discussed. (UK)

  13. Measures taken by electric power companies for the accident at JCO

    International Nuclear Information System (INIS)

    Taniguchi, Kazufumi

    2000-01-01

    Activities for the JCO accident were done by 700 electric company personnel/day at the maximum, who were mainly the experts of radiation management and were from the whole Japanese regions. The major activities were as follows. Monitoring of body surface contamination of people at the refuge, which was done on request from Tokaimura, showed no radioactive contamination over detection limit. Activities based on the request from the national counter-planning headquarters involved environmental monitoring, which only showed the higher ambient dose rate than usual at the boundary of JCO site. Monitoring of toy equipments in kindergartens and primary and junior schools showed no contamination over detection limit. Measurement of dose equivalent of the personnel showed 0.0 mSv exposure by γ-, β-ray and neutron. In summary, questions and requests raised by people mainly concerned the influence of radiation exposure. (K.H.)

  14. Vacuum education courses at the General Electric Company's Neutron Devices Department, St. Petersburg, Florida

    International Nuclear Information System (INIS)

    Provo, J.L.; Brown, W.C.

    1978-01-01

    Vacuum Technology has, from the beginning, played a key role in the production of the Department's products at the General Electric Company's Neutron Devices Department (GEND). Early recognition was given to the need for vacuum education and training for producing and maintaining vacuums to meet departmental objectives. The vacuum courses taught at GEND are described. These include basic Vacuum Technology, Advanced Vacuum Technology, and specialized vacuum related courses. Course offering rationale, outlines of subject matter covered and criteria for measuring effectiveness will be presented for each course. Such vacuum technology related courses have resulted in improved GEND product quality and in reducing losses and production cost. At the same time, these courses have given participating employees career motivation for fulfilling more challenging vacuum technology job related positions and have enabled them to achieve upward mobility in the Department's work force

  15. The implications of the Kyoto project mechanisms for the deployment of renewable electricity in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, P.D.R. [Universidad de Castilla-La Mancha, Toledo (Spain). Facultad de Ciencias Juridicas y Sociales; Hernandez, F. [IEG CSIC, Madrid (Spain); Gual, M. [Universidad Pablo de olavide, Sevilla (Spain)

    2005-10-01

    EU energy/environmental policy has at least two major and interrelated goals: to increase the percentage of electricity from renewable energy sources (RES-E) and to control the emission of GHG cost efficiently. These two goals could be in conflict. This paper explores one aspect of this conflicting relationship, namely the effect that the use of the Kyoto Protocol project mechanisms (CDM/JI project) may have on the deployment of RES-E within EU borders. The main conclusion is that, under certain assumptions (i.e., no mandatory EU RES-E quota), CDM/JI projects might reduce the incentive to deploy RES-E within EU borders because they would allow European power companies to comply with GHG targets in a cheaper way than if they reduced emissions by investing in renewable electricity in Europe. This is problematic, since many benefits from renewable electricity are local and these would be gone. This situation would be different if a mandatory RES-E quota (combined with an EU-wide TGC scheme) was implemented. In this case, the RES-E target would be fulfilled and CDM/JI projects would only affect RES-E deployment exceeding the target. (author)

  16. The implications of the Kyoto project mechanisms for the deployment of renewable electricity in Europe

    International Nuclear Information System (INIS)

    Rio Gonzalez, Pablo del; Hernandez, Felix; Gual, Miguel

    2005-01-01

    EU energy/environmental policy has at least two major and interrelated goals: to increase the percentage of electricity from renewable energy sources (RES-E) and to control the emission of GHG cost efficiently. These two goals could be in conflict. This paper explores one aspect of this conflicting relationship, namely the effect that the use of the Kyoto Protocol project mechanisms (CDM/JI project) may have on the deployment of RES-E within EU borders. The main conclusion is that, under certain assumptions (i.e., no mandatory EU RES-E quota), CDM/JI projects might reduce the incentive to deploy RES-E within EU borders because they would allow European power companies to comply with GHG targets in a cheaper way than if they reduced emissions by investing in renewable electricity in Europe. This is problematic, since many benefits from renewable electricity are local and these would be gone. This situation would be different if a mandatory RES-E quota (combined with an EU-wide TGC scheme) was implemented. In this case, the RES-E target would be fulfilled and CDM/JI projects would only affect RES-E deployment exceeding the target

  17. Where in the World are Canadian Oil and Gas Companies? An Introduction to the Project

    Directory of Open Access Journals (Sweden)

    Niloo Hojjati

    2017-06-01

    Full Text Available In April 2013, The School of Public Policy formally launched the Extractive Resource Governance Program, a platform to harness Canadian and international research and technical expertise to assist resource-rich jurisdictions in establishing sustainable and mutually beneficial policies for governance of the extractive sector. The program delivers applied policy research, technical assistance and executive training programs to countries with emerging or established extractive resources, working in collaboration with governments, regulatory bodies, academia, civil society, and industry. Begun in 2011 as an internal research tool for the development of the Extractive Resource Governance Program, this project was conceived as a means to identify jurisdictions where Canadian companies had ongoing projects and activities around the world. This paper introduces the methodology used to answer the question: Where in the world are Canadian oil and gas companies? To answer this question, firm-level data from publicly traded Canadian companies were collected and analyzed culminating in the development of an online tool for public use. This paper accompanies an interactive website launched by The School’s Extractive Resource Governance Program and describes the data available online as well as in the annual reports released by The school. The website and annual reports allow interested users to geographically locate jurisdictions around the world where publicly traded Canadian oil and gas companies have activities, over time. The website is available at http://www.policyschool.ca/research-teaching/teachingtraining/extractive-resource-governance/ergp-map/. While Canada is a well-recognized oil and gas jurisdiction within its own borders, the extent of activity that Canadian companies undertake in the international arena is less well known. For instance, while Natural Resources Canada collects and publishes regular data on Canadian mining assets and

  18. Efficiency and productivity (TFP) of the Turkish electricity distribution companies: An application of two-stage (DEA and Tobit) analysis

    International Nuclear Information System (INIS)

    Çelen, Aydın

    2013-01-01

    In this study, we analyze the efficiency performances of 21 Turkish electricity distribution companies during the period of 2002–2009. For this aim, we employ a two-stage analysis in order to take into account the business environment variables which are beyond the control of distribution companies. We determine the efficiency performances of the electricity distribution companies by help of DEA in the first stage. Then, in the second stage, using these calculated efficiency scores as dependent variable, we utilize Tobit model to determine the business environment variables which may explain the efficiency scores. According to the results, customer density of the region and the private ownership affect the efficiencies positively. Thus, the best strategy to improve efficiency in the market is privatizing the public distribution companies. - Highlights: • We analyze the efficiencies of 21 Turkish electricity distribution companies. • A two-stage analysis is employed to take into account environmental variables. • We firstly calculate efficiencies of companies with DEA, then Tobit model is used to determine the effects of the variables. • Customer density and ownership type affect the efficiencies positively. • Privatization is a good strategy to improve efficiencies

  19. Electrically modulated transparent liquid crystal-optical grating projection

    DEFF Research Database (Denmark)

    Buss, Thomas; Smith, Cameron; Kristensen, Anders

    2013-01-01

    A transparent, fully integrated electrically modulated projection technique is presented based on light guiding through a thin liquid crystal layer covering sub-wavelength gratings. The reported device operates at 10 V with response times of 4.5 ms. Analysis of the liquid crystal alignment shows...

  20. Cost structure analysis of commercial nuclear power plants in Japan based on corporate financial statements of electric utility companies

    International Nuclear Information System (INIS)

    Kunitake, Norifumi; Nagano, Koji; Suzuki, Tatsujiro

    1998-01-01

    In this paper, we analyze past and current cost structure of commercial nuclear power plants in Japan based on annual corporate financial statements published by the Japanese electric utility companies, instead of employing the conventional methodology of evaluating the generation cost for a newly constructed model plant. The result of our study on existing commercial nuclear plants reveals the increasing significance of O and M and fuel cycle costs in total generation cost. Thus, it is suggested that electric power companies should take more efforts to reduce these costs in order to maintain the competitiveness of nuclear power in Japan. (author)

  1. Biomass gasification to heat, electricity and biofuels. HighBio project publication

    Energy Technology Data Exchange (ETDEWEB)

    Lassi, U.; Wikman, B. (eds.)

    2011-07-01

    Renewable energy and the use of biomass in energy production promotes sustainable development and decreases the use of fossil fuels. Biomass, e.g. wood chips can be used in the production of heat and electricity, as well as being used as a biofuel component and novel product for the chemical industry. Efficient utilisation of biomass requires a high level of knowledge and the development of new processes to create a new way of thinking. In this process, international co-operation plays a significant role. The aim of the HighBio project was to produce new information on biomass gasification and the utilisation opportunities of product gas in biofuel and biochemicals production. The project was also aimed at studying utilisation properties of biogasification ashes in distributed energy production. Small-scaled CHP plants can be used for simultaneous heat and power production by gasifying wood chips and by burning energy intensive product gas. Compared with thermal combustion, particulate emissions from gasification are lower, which also contributes to the EU's ever tightening emission legislation. Several small and middle scale companies in the Northern part of Finland and Sweden have worked with biomass gasification, and during the project, the birth of new ones has been seen. In this development stage, researchers of the HighBio project have also been strongly involved. Increased use of renewable energy opens up new possibilities for entrepreneurship and the birth of new companies, especially in rural areas. In order to enable these opportunities, we need research data from the universities, novel innovations, and especially their successful commercialisation. The HighBio project has also contributed to tackling those challenges by arranging research seminars and meetings to companies and other interest groups, as well as by establishing research activities and collaborations. Regional collaboration combined with national and international research networks

  2. Measuring efficiency and productivity change in power electric generation management companies by using data envelopment analysis: A case study

    International Nuclear Information System (INIS)

    Fallahi, Alireza; Ebrahimi, Reza; Ghaderi, S.F.

    2011-01-01

    This paper provides an empirical analysis of the determinants of energy efficiency in 32 power electric generation management companies over the period 2005–2009. The study uses non-parametric Data Envelopment Analysis (DEA) to estimate the relative technical efficiency and productivity change of these companies. In order to verify the stability of our DEA model and the importance of each input variable, a stability test is also conducted. The results of the study indicate that average technical efficiency of companies decreased during the study period. Nearly half of the companies (14) are below this average level of 88.7% for five years. Moreover, it is shown that the low increase of productivity changes is more related to low efficiency rather than technology changes. -- Highlights: ► DEA was applied on the 32 power electric generation management companies. ► A stability test is applied to verify the stability of DEA model. ► Average technical efficiency of companies decreased during the study period. ► The low increase of productivity changes is more related to low efficiency changes.

  3. Relative Pricing of Publicly Traded U.S. Electric Utility Companies

    Science.gov (United States)

    Jewczyn, Nicholas Stephen

    In the financial turmoil of 2008, U.S. firms reported debt-ratios that differed from the debt-ratios calculated from balance sheets. The problem is that investors bought common stock expecting initial investment return and lost money when companies delisted. The purpose of this quantitative study was to determine sample securities pricing with the application of synthetic assets and debt accrued. Addressed in the research questions was whether those securities were (a) underpriced compared with return-on-assets (ROA), (b) overpriced compared with ROA, (c) a debt-ratio higher than 60% and also overpriced, (d) underpriced with a synthetic asset added, or (e) related by relative pricing to variant pricing and market capitalization. The study's base theory was Pan's efficient market hypothesis (EMH) of security price prediction of market prices versus model prices. The data from the financial statements of 16 publicly traded U.S. electric utility companies were analyzed via correlations and multiple regression analyses to determine securities pricing and suitability. The findings from the analyses of the sample's variables of market price, book value, market-to-book, and study constructed variables from those variable data were statistically significant. The alternate hypotheses were accepted for all 5 research questions since the analytical operationalization of the hypothetical constructs led to significant relationships. Results suggest that the use of more pricing determinants in securities evaluation may lead to investors losing less money and earning the expected returns for a more efficient capital market, leading to a stronger economy and macroeconomic stability.

  4. 76 FR 388 - Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice...

    Science.gov (United States)

    2011-01-04

    ... Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice of Consideration of Issuance... Web site http://www.regulations.gov . Because your comments will not be edited to remove any... will not edit their comments to remove any identifying or contact information, and therefore, they...

  5. 76 FR 30206 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice...

    Science.gov (United States)

    2011-05-24

    ... Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice of Consideration of Issuance..., http://www.regulations.gov . Because your comments will not be edited to remove any identifying or... received from other persons for submission to the NRC inform those persons that the NRC will not edit their...

  6. Institutional Governance Framework for Determining Carbon-related Accounting Practices: An Exploratory Study of Electricity Generating Companies in Malaysia

    Science.gov (United States)

    Alrazi, B.; Mat Husin, N.

    2016-03-01

    Electricity industry is the major contributor of the global carbon emissions which has been scientifically identified as the main cause of climate change. With the various initiatives being implemented at the international, national, and industry levels, companies in the electricity industry are currently facing immense pressure from various stakeholders to demonstrate their policies, initiatives, targets, and performance on climate change. Against this background, accounting system is argued to be able to be play important roles in combating climate change. Using institutional governance as the underlying framework, we have identified several governance mechanisms as the determining factors for companies to have a systematic accounting system related to carbon emissions. The factors include environmental management system certification, environmental organization, publication of stand-alone sustainability reports, the use of GRI guidelines, environmental strategic planning, governance quality, and participation in CDP surveys and emissions trading scheme. We explored this issue in the context of major electricity generating companies in Malaysia and found that except for certified environmental management system, the other governance mechanisms are still lacking. The findings suggest that companies in Malaysia, in particular, from the electricity industry are not well prepared in facing risks related to climate change.

  7. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Science.gov (United States)

    2010-12-06

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-275-LR; 50-323-LR] Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of Appointment of Adjudicatory Employee... Seismologist, Office of Nuclear Material Safety and Safeguards, has been appointed as a Commission adjudicatory...

  8. 76 FR 76153 - Allco Renewable Energy Limited v. Massachusetts Electric Company d/b/a National Grid; Notice of...

    Science.gov (United States)

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-12-000] Allco Renewable Energy Limited v. Massachusetts Electric Company d/b/a National Grid; Notice of Complaint Take notice... Public Utilities Regulatory Policies Act (PURPA), Allco Renewable Energy Limited filed a formal complaint...

  9. Electric G-Van demonstration and commercial assessment project

    Energy Technology Data Exchange (ETDEWEB)

    Braga, B.D. (Electric Power Research Inst., Palo Alto, CA (United States))

    1992-12-01

    The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

  10. Bill project on a new organisation of the electricity market

    International Nuclear Information System (INIS)

    2010-01-01

    A first text discusses the motivations of this bill project: to guarantee French supply security, to contribute to France economical competitiveness, to protect the environment, to give everybody access to energy, and to comply with the European energy market. It also comments the bill project content, the objectives aimed at through the different bill articles. These articles settle a regulated access to electricity and a regulatory frame for pricing, define provider responsibilities, deal with installation dismantling expenses. This presentation is followed by the bill text and by the report of an impact study of the implementation of a regulated access to electricity, of a capacity obligation, and of the evolution of regulated selling prices

  11. FINANCIAL INDICATORS FOR THE ROMANIAN COMPANIES BETWEEN ELIGIBILITY AND BANKABILITY OF EU FINANCED PROJECTS

    Directory of Open Access Journals (Sweden)

    Droj Laurentiu

    2014-12-01

    Full Text Available The main goal of this research is to compare the eligibility indicators for accessing EU projects with the bankability indicators at the level of Romanian companies. This study was realized in a period when the term of bankability seems to be in the focus of the beneficiaries and management authorities for European funding, of the banking system and of the mass-media as well. This happens for the first time since the launch in 2007-2008 of the main structural EU funding programs focusing on the development of competitive SMEs, which brought significant changes in the EU funding environment. The same with the public institutions, many SMEs have applied for grants in order to finance their investments using different funding programs, especially under the European Regional Development Fund. This process to obtain European funding was a long one in term of evaluation and contracting periods. Under this context, the initial success of SMEs that have successfully applied and even managed to gain access to European funding was overshadowed by another sharper problem: lack of financial resources for co-financing to support investments or expenditures in the initial stages funding the project. This was also a big problem since the start of word financial and economic crisis. Under this context the banking sector was supposed to be heavily involved in ensuring external financing. The main difficulties in co-financing European funding projects by the banks came from the fact that the companies were requested to obtain satisfactory scores in order to qualify for the banking loans. Several indicators were used by the banking sector to analyze the creditworthiness of the applicant companies. From these indicators we selected five of them to be tested by using Student distribution modelling within the ModelRISK – VoseSoftware application over a group of 50 companies located in the North-Western region of Romania. After the model was created in this paper we

  12. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  13. Analysis of the General Electric Company swell tests with RELAP4/MOD7

    International Nuclear Information System (INIS)

    Fischer, S.R.; Hendrix, C.E.

    1979-01-01

    The RELAP4/MOD7 nuclear reactor transient analysis code, presently being developed by EG and G Idaho, Inc., will incorporate several significant improvements over earlier versions of RELAP4. As part of the development of RELAP4/MOD7, a thorough assessment of the capability of the code to simulate water reactor LOCA phenomena is being made. This assessment is accomplished in part by comparing results from code calculations with test data from experimental facilities. Simulations of the General Electric Company (GE) level swell tests were performed as part of the code checkout. In these tests, a pressurized vessel partially filled with nearly saturated water was blown down through a simulated break located near the top of the vessel. Comparison of RELAP4 calculations with data from these experiments indicates that the code has the capability to model the unequal phase velocity flow and resulting density gradients that might occur in a BWR steam line break transient. Comparisons of RELAP4 calculations with data from two level swell experiments are presented

  14. NRC [Nuclear Regulatory Commission] staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    International Nuclear Information System (INIS)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved

  15. Development, assessment, licensing, and application of RELAP5YA at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Husain, A.

    1984-01-01

    Since 1975, Yankee Atomic Electric Company (YAEC) has been licensed to perform LOCA analyses (large and small breaks) for PWRs. The methods are based upon the WREM package, comprised of RELAP4-MOD 3, RELAP4-FLOOD, and TOODEE-2EM. Significant efforts were expended to compare WREM models against Appendix K criteria, and to incorporate changes for compliance with the criteria and for improved representation of LOCA phenomena. /SUP 2,3,4/ This internalized capability has been used extensively for licensing the Yankee and Maine Yankee plants, and for timely resolution of LOCA issues which frequently arose. The value of this internalized analysis capability was well recognized by the Yankee management. In 1979, Yankee embarked upon another LOCA Methods Development Program. One objective was to remove extra conservatisms inherent in older codes to provide additional operational flexibility for our plants. Also, we needed a code which could be used in a production mode to provide realistic response for off-normal conditions to be used in operator training and emergency guideline assessment. This program resulted in the development of RELAP5YA. The development, assessment, licensing, and application of RELAP5YA at YAEC is briefly described in this paper

  16. 76 FR 54259 - Virginia Electric and Power Company, Docket Nos. 50-338 and 50-339, North Anna Power Station...

    Science.gov (United States)

    2011-08-31

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0185] Virginia Electric and Power Company, Docket Nos. 50.... NPF-4 and NPF-7, issued to Virginia Electric Power Company (the licensee), for operation of the North...) and (d) during declarations of severe weather conditions involving tropical storm or hurricane force...

  17. 76 FR 77022 - In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2...

    Science.gov (United States)

    2011-12-09

    ... and 72-3] In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2, H. B. Robinson Steam Electric Plant, Unit 2, Independent Spent Fuel Storage Installation; Order Approving Indirect Transfer of Control of Licenses I. Carolina Power & Light Company (CP&L, the licensee) is...

  18. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  19. The Marketplace Variables in Successful and Unsuccessful NPD Projects in Technology Intensive Companies

    Directory of Open Access Journals (Sweden)

    Matti J. Haverila

    2010-12-01

    Our findings indicate that managers perceive the marketplace in multiple ways during the NPD process and also that differences exist in metric equivalence across successful and unsuccessful NPD projects. Also, although half of the marketplace variables are positively related to NPD success, managers in Finnish technology companies appear to attach higher relative importance to market attractiveness rather than market competitiveness variables. Marketplace variables appear to be less important than in the Korean and Chinese samples, and much more important than  in the Canadian sample in the Mishra et all study (1996, and similarly much more important than in the Cooper study (1979b.

  20. Performance assessment of the PNM Prosperity electricity storage project

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Dakota [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ellison, James F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bhatnagar, Dhruv [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Schoenwald, David A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-05-01

    The purpose of this study is to characterize the technical performance of the PNM Prosperity electricity storage project, and to identify lessons learned that can be used to improve similar projects in the future. The PNM Prosperity electricity storage project consists of a 500 kW/350 kWh advanced lead-acid battery with integrated supercapacitor (for energy smoothing) and a 250 kW/1 MWh advanced lead-acid battery (for energy shifting), and is co-located with a 500 kW solar photovoltaic (PV) resource. The project received American Reinvestment and Recovery Act (ARRA) funding. The smoothing system is e ective in smoothing intermittent PV output. The shifting system exhibits good round-trip efficiencies, though the AC-to-AC annual average efficiency is lower than one might hope. Given the current utilization of the smoothing system, there is an opportunity to incorporate additional control algorithms in order to increase the value of the energy storage system.

  1. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  2. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  3. Energy saving projects in two steel companies in Fushun City, China

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of saving energy and reducing greenhouse gas emission, investigations and discussions were given on two steel making companies in China. Discussions were given for Fushun Special Steel Co., Ltd. on abolishment and unification of four electric furnaces into two new electric furnaces, and for Fushun New Steel Co., Ltd. on installation of a granulation reinforcing facility, a segregation reinforcing device, and cooler waste heat recovery boilers for the sintering machine, installation of sensors including the waste gas oxygen concentration meter, adoption of a process computer, and optimization of the furnace temperature patterns for the heating furnace. As a result of the discussions, it was revealed that the unit requirement for electric power used at Fushun Special Steel can be reduced largely, and so can the fuel used at Fushun New Steel. The annual energy saving effect would be about 500 million yen relative to the investment amount of 2.8 billion yen at Fushun Special Steel, and about 400 million yen relative to the investment amount of about 400 million yen at Fushun New Steel. The greenhouse gas emission would be reduced annually by 40,000 t-CO2 and 60,000 t-CO2 respectively. Fushun Special Steel will execute an international bid in May this year. (NEDO)

  4. Simulation of Hawaiian Electric Companies Feeder Operations with Advanced Inverters and Analysis of Annual Photovoltaic Energy Curtailment

    Energy Technology Data Exchange (ETDEWEB)

    Giraldez Miner, Julieta I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Nagarajan, Adarsh [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gotseff, Peter [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Krishnan, Venkat K [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hoke, Anderson F [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ueda, Reid [Hawaiian Electric Company; Shindo, Jon [Hawaiian Electric Company; Asano, Marc [Hawaiian Electric Company; Ifuku, Earle [Hawaiian Electric Company

    2017-07-26

    The Hawaiian Electric Companies achieved a consolidated Renewable Portfolio Standard (RPS) of approximately 26% at the end of 2016. This significant RPS performance was achieved using various renewable energy sources - biomass, geothermal, solar photovoltaic (PV) systems, hydro, wind, and biofuels - and customer-sited, grid-connected technologies (primarily private rooftop solar PV systems). The Hawaiian Electric Companies are preparing grid-modernization plans for the island grids. The plans outline specific near-term actions to accelerate the achievement of Hawai'i's 100% RPS by 2045. A key element of the Companies' grid-modernization strategy is to utilize new technologies - including storage and PV systems with grid-supportive inverters - that will help to more than triple the amount of private rooftop solar PV systems. The Hawaiian Electric Companies collaborated with the Smart Inverter Technical Working Group Hawai'i (SITWG) to partner with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to research the implementation of advanced inverter grid support functions (GSF). Together with the technical guidance from the Companies's planning engineers and stakeholder input from the SITWG members, NREL proposed a scope of work that explored different modes of voltage-regulation GSF to better understand the trade-offs of the grid benefits and curtailment impacts from the activation of selected advanced inverter grid support functions. The simulation results presented in this report examine the effectiveness in regulating voltage as well as the impact to the utility and the customers of various inverter-based grid support functions on two Hawaiian Electric distribution substations.

  5. Communication network structure parameters and new knowledge generation capabilities in companies engaged in industry control system engineering projects

    Directory of Open Access Journals (Sweden)

    Titov Sergei

    2016-01-01

    Full Text Available Engineering companies engaged in business of industry control systems need to manage the processes of generation of innovations within and across their projects. Generation and diffusion of innovations materialize through the communication networks of project teams. Therefore, it is possible to hypothesize that the characteristics of communication networks play role in generation of new knowledge. With the data from 14 industry control system projects of a Russian engineering company the communication network structure characteristics were calculated and the analysis of correlation between these characteristics and knowledge generation capabilities was performed. As a result correlation between centralization of communication and the number of new technical solutions developed in projects was discovered.

  6. U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter; Goldman, Charles; Satchwell, Andrew

    2012-08-21

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a ?top-down? approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a ?bottom-up? analysis of a database of ~;;3,250 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of a severe economic recession, the U.S. ESCO industry managed to grow at about 7percent per year between 2006 and 2008. ESCO industry revenues were about $4.1 billion in 2008 and ESCOs anticipate accelerated growth through 2011 (25percent per year). We found that 2,484 ESCO projects in our database generated ~;;$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20percent of all U.S. ESCO market activity from 1990-2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated ~;;$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. There is empirical evidence confirming that the industry is evolving by installing more comprehensive and complex measures?including onsite generation and measures to address deferred maintenance?but this evolution has significant implications for customer project

  7. Enemona's Company experience in management of complex construction and modernization projects in sectors of industry and energetics

    International Nuclear Information System (INIS)

    Kalionski, V.

    2005-01-01

    The purpose of this paper is to present the Enemona's Company experience, gained during the management of complex projects related to Kozloduy NPP Modernization Program, enriched during the long-term collaboration with the international companies which are the executors of modernization projects. For the successful implementation of tasks on Framatom, Westinghouse, Atomenergo export projects, an exchange of process transfer, managerial practices were established between the Employers companies and Enemona Company, which along with the use of material resources, organization and personnel gave Enemona opportunity to implement and optimize goals that were set to the company. Some principles, approaches and methods of works have been established, based on strict scientific methods and practices that support Enemona to be competitive in order to assume fulfillment of similar projects not only at Kozloduy NPP site, but also at new projects and sites including the challenge for the erection of Belene NPP. In order to meet requirements of foreign companies, Enemona is able to apply new technologies and achievements in assurance of high quality of repair and installation activities on construction of new objects or their modernization

  8. Software for improving the quality of project management, a case study: international manufacture of electrical equipment

    Science.gov (United States)

    Preradović, D. M.; Mićić, Lj S.; Barz, C.

    2017-05-01

    Production conditions in today’s world require software support at every stage of production and development of new products, for quality assurance and compliance with ISO standards. In addition to ISO standards such as usual metrics of quality, companies today are focused on other optional standards, such as CMMI (Capability Maturity Model Integrated) or prescribing they own standards. However, while there is intensive progress being made in the PM (project management), there is still a significant number of projects, at the global level, that are failures. These have failed to achieve their goals, within budget or timeframe. This paper focuses on checking the role of software tools through the rate of success in projects implemented in the case of internationally manufactured electrical equipment. The results of this research show the level of contribution of the project management software used to manage and develop new products to improve PM processes and PM functions, and how selection of the software tools affects the quality of PM processes and successfully completed projects.

  9. Service hall in Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc

    International Nuclear Information System (INIS)

    Tawara, Shigesuke

    1979-01-01

    There are six BWR type nuclear power plants in the Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc. The service hall of the station is located near the entrance of the station. In the center of this service hall, there is the model of a nuclear reactor of full scale. This mock-up shows the core region in the reactor pressure vessel for the number one plant. The diameter and the thickness of the pressure vessel are about 5 m and 16 cm, respectively. The fuel assemblies and control rods are set just like the actual reactor, and the start-up operation of the reactor is shown colorfully and dynamically by pushing a button. When the control rods are pulled out, the boiling of water is demonstrated. The 1/50 scale model of the sixth plant with the power generating capacity of 1100 MWe is set, and this model is linked to the mock-up of reactor written above. The operations of a recirculating loop, a turbine and a condenser are shown by switching on and off lamps. The other exhibitions are shielding concrete wall, ECCS model, and many kinds of panels and models. This service hall is incorporated in the course of study and observation of civics. The good environmental effects to fishes and shells are explained in this service hall. Official buildings and schools are built near the service hall utilizing the tax and grant concerning power generation. This service hall contributes to give much freedom from anxiety to the public by the tour. (Nakai, Y.)

  10. Preliminary irradiation test results from the Yankee Atomic Electric Company reactor vessel test irradiation program

    International Nuclear Information System (INIS)

    Biemiller, E.C.; Fyfitch, Stephen; Campbell, C.A.

    1994-01-01

    The Yankee Atomic Electric Company test irradiation program was implemented to characterize the irradiation response of representative Yankee Rowe reactor vessel beltline plate materials and to remove uncertainties in the analysis of existing irradiation data on the Yankee Rowe reactor vessel steel. Plate materials each containing 0.24 w/o copper, but different nickel contents at 0.63 w/o and 0.19 w/o, were heat treated to simulate the Yankee vessel heat treatment (austenitized at 982 o C (1800 o F)) and to simulate Regulatory Guide 1.99 database materials (austenitized at 871 o C (1600 o F)). These heat treatments produced different microstructures so the effect of microstructure on irradiation damage sensitivity could be tested. Because the nickel content of the test plates varied and the copper level was constant, the effect of nickel on irradiation embrittlement was also tested. Correlation monitor material, HSST-02, was included in the program to benchmark the Ford Nuclear Reactor (University of Michigan Test Reactor) which had never been used before for this type of irradiation program. Materials taken from plate surface locations (versus 1/4 T) were included to test whether or not the improved toughness properties of the plate surface layer, resulting from the rapid quench, are maintained after irradiation. If the improved properties are maintained, pressurized thermal shock calculations could utilize this margin. Finally, for one experiment, irradiations were conducted at two irradiation temperatures (260 o C and 288 o C) to determine the effect of irradiation temperature on embrittlement. (Author)

  11. Interim report on the accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    2011-12-01

    The Investigation Committee on the Accident at the Fukushima Nuclear Power Stations (the Investigation Committee) of Tokyo Electric Power Company (TEPCO) was established by the Cabinet decision on May 24, 2011. Its objectives are: to conduct investigation for finding out the causes of accidents at the Fukushima Dai-ichi Nuclear Power Station (Fukushima Dai-ichi NPS) and Fukushima Dai-ni Nuclear Power Station (Fukushima Dai-ni NPS) of TEPCO as well as the causes of accident damage; and to make policy recommendations for limiting the expansion of damage and preventing reoccurrence of similar accidents. The Investigation Committee has conducted its investigation and evaluation since its first meeting on June 7, 2011. Its activities included: site visits to the Fukushima Dai-ichi and Dai-ni NPSs, as well as to other facilities; hearing of heads of local governments around the Fukushima Dai-ichi NPS; and hearing of people concerned through interviews mainly arranged by the Secretariat. As of December 16, 2011, the number of interviewees reached 456. The investigation and evaluation by the Investigation Committee are still ongoing and the Interim Report does not cover every item that the Committee aims at investigating and evaluating. Fact-finding of even some of those items discussed in the Interim Report are not yet completed. The Investigation Committee continues to conduct its investigation and evaluation and will issue its Final Report in the summer of 2012. This brief executive summary covers mainly considerations and evaluation of the issues in Chapter VII of the Interim Report, with brief reference to Chapters I to VI. The Investigation Committee recommendations are printed in bold. (author)

  12. Municipal energy concepts. A service task for electric utility companies; Kommunale Energiekonzepte. Eine Dienstleistungsaufgabe fuer Energieversorgungsuntemehmen

    Energy Technology Data Exchange (ETDEWEB)

    Just, W. [Stadtwerke Gelsenkirchen GmbH (Germany)

    1994-11-01

    The article explains to what extent suitable measures can be realized and supported in a municipality with municipal energy concepts or even climate protection concepts. The target is to attain with limited financial means the most favourable economic and ecological effects in the municipality or in the region. Many electric utilities have in the last years forced the realization of energy conservation measures and have become energy service companies. With their expert knowledge they are ideal partners for politics, public adminstration and citizens. They have the best qualificatons for the development and realization of municipal concepts. In many cases it shows that with detailed studies the target can be quicker and more effectively attained as with extensive, time-consuming and expensive studies which are not particularly realization-oriented. The report is to give examples which might be helpful for the development of a concept. (orig./UA) [Deutsch] Der Beitrag erlaeutert, inwieweit umfangreiche kommunale Energiekonzepte oder sogar Klimaschutzkonzepte geeignete Massnahmen in der Kommune realisieren und foerdern koennen. Ziel sollte sein, mit begrenztem Mitteleinsatz die oekonomisch-oekologisch groessten Effekte in der Kommune bzw. in der Region zu erzielen. Viele Energie-Versorgungsunternehmen haben in den letzten Jahren die Realisierung von Energieparmassnahmen vorangetrieben und sich zu Energie-Dienstleistungsunternehmen entwickelt. Mit ihrer Sachkompetenz sind sie der ideale Partner fuer Politik, oeffentliche Verwaltung und Buerger/innen. Sie bringen die besten Voraussetzungen mit bei der Erarbeitung und Umsetzung von kommunalen Konzepten. Vielfach zeigt sich, dass Detailkonzepte schneller und wirkungsvoller zum Ziel fuehren, als umfachreiche, zeitaufwendige und teure Studien, die wenig umsetzungsorientiert sind. Die nachfolgenden Ausfuehrungen sind als Beispiele gedacht. Sie koennen Anregungen fuer die Erstellung eines Konzeptes vermitteln. (orig./UA)

  13. Revenue cap regulation in a deregulated electricity market : effects on a grid company

    OpenAIRE

    Bjørndal, Mette; Jörnsten, Kurt

    2002-01-01

    In 1997 an incentive-based regulation was introduced for Norwegian transmission and distribution companies. Under the following revenue regulation regime, the permissible revenue of a grid company is adjusted annually, and during the first regulation period, the new revenue cap was determined on the basis of last year’s revenue cap, adjusting for inflation, productivity improvement, and load growth. The idea behind the load growth compensation factor was that the grid companies should be comp...

  14. COMPETITIVE FACTORS IN ERP SYSTEM IMPLEMENTATION: A CASE STUDY OF A COMPANY OF ELECTRIC GENERATORS

    OpenAIRE

    Prado, Emerson Luiz; Passanezi, Paula Meyer Soares

    2015-01-01

    The increasing globalization of markets and increased competitiveness has required the use of appropriate management information in decision-making of companies. The Enterprise Resource Planning (ERP) is an integrated information system widely used by managers in their decision making processes. This exploratory case study, conducted in the company Stemac S/A, aims to analyze the advantages and disadvantages of the ERP system and compares them the real needs of the company. Specifics objectiv...

  15. Performance of the Electric power companies of Burkina Faso, the Ivory Coast, Mali and Senegal, and their organizational models

    International Nuclear Information System (INIS)

    Girod, J.

    1993-01-01

    The history of the technical, economic, and financial performances of these four countries' power companies over the past two decades is recounted, and then interpreted as the result of the existing organizational models. The changes that have occurred can be understood in long-term perspective by comparing the performance of these companies to the characteristics, rules, and objectives used to define the models, which also helps explain the history of performance indicator variations. Two models are defined: one for the physical plant and one for the management. These correspond to two successive phases in the organization and operation of the electrical sector. Rural electrification and regional interconnection will be important factors in any new model or models developed for the future, because the forms they take is likely to modify the characteristics of these national power companies. 26 refs., 1 fig., 3 tabs

  16. A three-stage short-term electric power planning procedure for a generation company in a liberalized market

    International Nuclear Information System (INIS)

    Nabona, Narcis; Pages, Adela

    2007-01-01

    In liberalized electricity markets, generation companies bid their hourly generation in order to maximize their profit. The optimization of the generation bids over a short-term weekly period must take into account the action of the competing generation companies and the market-price formation rules and must be coordinated with long-term planning results. This paper presents a three stage optimization process with a data analysis and parameter calculation, a linearized unit commitment, and a nonlinear generation scheduling refinement. Although the procedure has been developed from the experience with the Spanish power market, with minor adaptations it is also applicable to any generation company participating in a competitive market system. (author)

  17. An FAHP-TOPSIS framework for analysis of the employee productivity in the Serbian electrical power companies

    Directory of Open Access Journals (Sweden)

    Snezana Pavle Knezevic

    2017-09-01

    Full Text Available The aim of this paper is to apply an integrated model, which combines methods of classical and fuzzy Multi-criteria decision making (MCDM in selected six large equity companies from the Serbian energy sector. The data considered are retrieved from the official financial statements. Four main criteria were analyzed, identified by the previous researchers and pointing to the employees productivity: Operating income/Number of employees, Equity/Number of employees, Net income/Number of employees and Total assets/Number of employees. The contribution of this paper lies in the application of a hybrid model that integrates two MCDM methods: Fuzzy Analytic Hierarchy Process (FAHP and Technique for Order Performance by Similarity to Ideal Solution (TOPSIS to analyse the employee productivity in selected D-Electrical power supply companies operating in Serbia. The FAHP is an effective method for mathematical representation of uncertain and imprecise evaluations made by humans, while the TOPSIS method is an efficient way to rank the alternatives. Results show that operating income is of highest importance for estimating employee productivity and decision making, while equity is of the weakest. Furthermore, the most productive operations in large enterprises from selected companies of the sector D-Electrical power supply are found in the company PC EPS Beograd, and the lowest are in the ED Center llc Kragujevac.

  18. Barriers to electricity load shift in companies: A survey-based exploration of the end-user perspective

    International Nuclear Information System (INIS)

    Olsthoorn, Mark; Schleich, Joachim; Klobasa, Marian

    2015-01-01

    As countries move toward larger shares of renewable electricity, the slow diffusion of active electricity load management should concern energy policy makers and users alike. Active load management can increase capacity factors and thereby reduce the need for new capacity, improve reliability, and lower electricity prices. This paper conceptually and empirically explores barriers to load shift in industry from an end-user perspective. An online survey, based on a taxonomy of barriers developed in the realm of energy efficiency, was carried out among manufacturing sites in mostly Southern Germany. Findings suggest that the most important barriers are risk of disruption of operations, impact on product quality, and uncertainty about cost savings. Of little concern are access to capital, lack of employee skills, and data security. Statistical tests suggest that companies for which electricity has higher strategic value rate financial and regulatory risk higher than smaller ones. Companies with a continuous production process report lower barrier scores than companies using batch or just-in-time production. A principal component analysis clusters the barriers and multivariate analysis with the factor scores confirms the prominence of technical risk as a barrier to load shift. The results provide guidance for policy making and future empirical studies. - Highlights: • We quantitatively assess barriers to load shift adoption among manufacturing firms. • Conceptually, we build on the literature on barriers to energy efficiency. • The most important barriers are interference with production and with product quality. • Companies with a continuous production process report lower barrier scores. • The barriers to load shift may be organized in distinct clusters via principal component analysis

  19. An agent-based simulation of power generation company behavior in electricity markets under different market-clearing mechanisms

    International Nuclear Information System (INIS)

    Aliabadi, Danial Esmaeili; Kaya, Murat; Şahin, Güvenç

    2017-01-01

    Deregulated electricity markets are expected to provide affordable electricity for consumers through promoting competition. Yet, the results do not always fulfill the expectations. The regulator's market-clearing mechanism is a strategic choice that may affect the level of competition in the market. We conceive of the market-clearing mechanism as composed of two components: pricing rules and rationing policies. We investigate the strategic behavior of power generation companies under different market-clearing mechanisms using an agent-based simulation model which integrates a game-theoretical understanding of the auction mechanism in the electricity market and generation companies' learning mechanism. Results of our simulation experiments are presented using various case studies representing different market settings. The market in simulations is observed to converge to a Nash equilibrium of the stage game or to a similar state under most parameter combinations. Compared to pay-as-bid pricing, bid prices are closer to marginal costs on average under uniform pricing while GenCos' total profit is also higher. The random rationing policy of the ISO turns out to be more successful in achieving lower bid prices and lower GenCo profits. In minimizing GenCos' total profit, a combination of pay-as-bid pricing rule and random rationing policy is observed to be the most promising. - Highlights: • An agent-based simulation of generation company behavior in electricity markets is developed. • Learning dynamics of companies is modeled with an extended Q-learning algorithm. • Different market clearing mechanisms of the regulator are compared. • Convergence to Nash equilibria is analyzed under different cases. • The level of competition in the market is studied.

  20. 77 FR 74882 - STP Nuclear Operating Company, South Texas Project; Notice of Availability of Draft Supplement 48...

    Science.gov (United States)

    2012-12-18

    ... Operating Company, South Texas Project; Notice of Availability of Draft Supplement 48 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of South Texas Project Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has...

  1. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  2. Tanadgusix Foundation Hydrogen / Plug In Electric Vehicle Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Martin [TDX Power Inc., Anchorage, AK (United States)

    2013-09-27

    TDX Foundation undertook this project in an effort to evaluate alternative transportation options and their application in the community of Saint Paul, Alaska an isolated island community in the Bering Sea. Both hydrogen and electric vehicle technology was evaluated for technical and economic feasibility. Hydrogen technology was found to be cost prohibitive. TDX demonstrated the implementation of various types of electric vehicles on St. Paul Island, including side-by-side all terrain vehicles, a Chevrolet Volt (sedan), and a Ford Transit Connect (small van). Results show that electric vehicles are a promising solution for transportation needs on St. Paul Island. Limited battery range and high charging time requirements result in decreased usability, even on a small, isolated island. These limitations were minimized by the installation of enhanced charging stations for the car and van. In collaboration with the University of Alaska Fairbanks (UAF), TDX was able to identify suitable technologies and demonstrate their applicability in the rural Alaskan environment. TDX and UAF partnered to engage and educate the entire community of Saint Paul – fom school children to elders – through presentation of research, findings, demonstrations, first hand operation of alternative fuel vehicles.

  3. Risk impact of planned maintenance configuration at South Texas Project Electric Generating Station

    International Nuclear Information System (INIS)

    Loh, W.T.; Fleming, K.N.; Grantom, C.R.

    2004-01-01

    This paper is based on a study done for the Houston Lighting and Power Company. The purpose of this study is to estimate the risk impact of planned maintenance configurations at South Texas Project Electric Generating Station (STPEGS). To date, the focus of the STP probabilistic safety assessment (PSA) program has been to analyze risk in terms of estimates of accident frequencies that are expressed on a time-averaged basis. Thus, estimates of quantities such as severe core damage frequency have been made such that the temporal variations of this frequency with changing plant configurations are averaged out over time. The only condition that has been imposed on these estimates is that the plant is initially operating at full power when potential initiating events might occur. (author)

  4. Reactor coolant pump type RUV for Westinghouse Electric Company LLC reactor AP1000 TM

    International Nuclear Information System (INIS)

    Baumgarten, S.; Brecht, B.; Bruhns, U.; Fehring, P.

    2010-01-01

    The RUV is a reactor coolant pump, specially designed for the Westinghouse Electric Company LLC AP1000 TM reactor. It is a hermetically sealed, wet winding motor pump. The RUV is a very compact, vertical pump/motor unit, designed to fit into the compartment next to the reactor pressure vessel. Each of the two steam generators has two pump casings welded to the channel head by the suction nozzle. The pump/motor unit consists of a pump part, where a semi-axial impeller/diffuser combination is mounted in a one-piece pump casing. Computational Fluid Dynamics methods combined with various hydraulic tests in a 1:2 scale hydraulic test assure full compliance with the specific customer requirements. A short and rigid shaft, supported by a radial bearing, connects the impeller with the high inertia flywheel. This flywheel consists of a one-piece forged stainless steel cylinder, with an option for several smaller heavy metal cylinders inside. The flywheel is located inside the thermal barrier, which forms part of the pressure boundary. A specific arrangement of cooling water circuits guarantees a homogeneous temperature distribution in and around the flywheel, minimizes the friction losses of the flywheel and protects the motor from hot coolant. The driving torque is transmitted by the motor shaft, which itself is supported by two radial bearings. A three-phase, high-voltage squirrel-cage induction motor generates the driving torque. Due to the wet winding concept it is possible to achieve positive effects regarding motor lifetime. The cooling water is forced through the stator windings and the gap between rotor and stator by an auxiliary impeller. Furthermore, this wet winding motor concept has higher efficiency as compared to a canned motor since there are no eddy current losses. As part of the design process and in addition to the hydraulic scale model, a complete half scale model pump was built. It was used to verify the calculations performed like coast

  5. Preliminary irradiation test results from the Yankee Atomic Electric Company reactor vessel test irradiation program

    International Nuclear Information System (INIS)

    Biemiller, E.C.; Fyfitch, S.; Campbell, C.A.

    1993-01-01

    The Yankee Atomic Electric Company test irradiation program was implemented to characterize the irradiation response of representative Yankee Rowe reactor vessel beltline plate materials and to remove uncertainties in the analysis of existing irradiation data on the Yankee Rowe reactor vessel steel. Plate materials each containing 0.24 w/o copper, but different nickel contents at 0.63 w/o and 0.19 w/o, were heat treated to simulate the Yankee vessel heat treatment (austenitized at 1800 deg F) and to simulate Regulatory Guide 1.99 database materials (austenitized at 1600 deg. F). These heat treatments produced different microstructures so the effect of microstructure on irradiation damage sensitivity could be tested. Because the nickel content of the test plates varied and the copper level was constant, the effect of nickel on irradiation embrittlement was also tested. Correlation monitor material, HSST-02, was included in the program to benchmark the Ford Nuclear Reactor (U. of Michigan Test Reactor) which had never been used for this type of irradiation program. Materials taken from plate surface locations (vs. 1/4T) were included to test whether or not the improved toughness properties of the plate surface layer, resulting from the rapid quench, is maintained after irradiation. If the improved properties are maintained, pressurized thermal shock calculations could utilize this margin. Finally, for one experiment, irradiations were conducted at two irradiation temperatures (500 deg. F and 550 deg. F) to determine the effect of irradiation temperature on embrittlement. The preliminary results of the irradiation program show an increase in T 30 shift of 69 deg. F for a decrease in irradiation temperature of 50 deg. F. The results suggest that for nickel bearing steels, the superior toughness of plate surface material is maintained after irradiation and for the copper content tested, nickel had no apparent effect on irradiation response. No apparent microstructure

  6. 75 FR 14207 - Virginia Electric and Power Company d/b/a/Dominion Virginia Power, and Old Dominion Electric...

    Science.gov (United States)

    2010-03-24

    ..., VA. For Further Information, Contact: Alicia Williamson, Project Manager, Environmental Projects...-mail to Alicia[email protected] . Dated at Rockville, Maryland, this 17th day of March 2010. For the...

  7. 75 FR 78979 - Application to Export Electric Energy; Twin Rivers Paper Company Inc.

    Science.gov (United States)

    2010-12-17

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-366] Application to Export Electric Energy; Twin Rivers... electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act. DATES... received an application from Twin Rivers for authority to transmit electric energy from the United States...

  8. 78 FR 11633 - Application To Export Electric Energy; ConocoPhillips Company

    Science.gov (United States)

    2013-02-19

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-336-A] Application To Export Electric Energy; Conoco..., DOE issued Order No. EA-336, which authorized CoP to transmit electric energy from the United States... facilities to the transmission grid. CoP states that all of the electric energy that CoP proposes to export...

  9. Getting to Gender Equality in Energy Infrastructure : Lessons from Electricity Generation, Transmission, and Distribution Projects

    OpenAIRE

    Orlando, Maria Beatriz; Janik, Vanessa Lopes; Vaidya, Pranav; Angelou, Nicolina; Zumbyte, Ieva; Adams, Norma

    2018-01-01

    Getting to Gender Equality in Electricity Infrastructure: Lessons from Electricity Generation, Transmission, and Distribution Projects examines the social and gender footprint of large-scale electricity generation, transmission, and distribution projects to establish a foundation on which further research and replication of good practices can be built. The main impact pathways analyzed are...

  10. Setting up charging electric stations within residential communities in current China: Gaming of government agencies and property management companies

    International Nuclear Information System (INIS)

    Wu, Tian; Ma, Lin; Mao, Zhonggen; Ou, Xunmin

    2015-01-01

    The difficulty of charging electric vehicles (EVs) is now hindering their further development. Governments generally choose to build stations for home charging (including piles) within residential communities. Given the conflict of interest between various government agencies and property management companies, constructing a charging station within residential communities would result in welfare loss for the property management companies and therefore lead to the principal–agent problem. This paper constructs a two-period imperfect information game theory model to study the moral hazard involved in this issue and government agencies' optimal choice. In the analytic solution of the model, we find that the optimal choice for a farsighted government agency is to constantly improve the incentive mechanism and introduce charging stations only when the conflict of interest is eliminated. Any benefits derived from government regulations by force would prove short-lived. The government should focus on long-term returns in the development of EVs, and its optimal mechanism should be designed to mitigate the principal–agent problem of property management companies, thereby accelerate the progress of EV charging infrastructure and improve overall social welfare. - Highlights: • The charging of electric vehicles (EVs) is hindering their use. • A game theory model is used for analysis of EV charging station construction. • Charging stations are in residential communities in China. • Government agencies are constantly improving incentive mechanisms

  11. Instruments for the regulation of the electric power projects: An integrated vision of the socio-environmental aspects

    International Nuclear Information System (INIS)

    Regini Nutti, Miriam; Milazzo, Maria Luiza; Rodriguez Garcia, Eduardo; Menezes, Carlos Frederico; Pompeu Serran, Flavia; Sebastiao Costa, Luiz; Neves Mundim, Rogerio

    1999-01-01

    The process of institutional change in the Brazilian electric sector accelerated the revision or elaboration of relating normative documents to the elaboration of studies and generation projects and electric power transmission. These documents were produced in a cooperative way by initiative of the organ federal regulator, under the coordination of ELETROBRAS and with the collaboration of technical teams of about ten Brazilian companies of energy. The aspects socio-environmental was absorbed in the normative documents, starting from an integrated vision of content and of the activities proposed with the energy studies and of engineering, allowing to diminish the relating uncertainties to the implementation of the projects and to assist to the national and sector environmental politics

  12. Development on power distribution technologies of four electric power companies in Japan. The Kansai Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Since dependency upon electric power has been rising yearly with the development of industry and the progress of information-oriented society, various kinds of technical development are needed to supply electricity. Furthermore, amenity of people's living has been highly intended, and life style has varied. Consequently, customers' needs for energy including related services have varied remarkably, and each customer has selected energy more subjectively from the wide range of viewpoint such as reliability, handiness, cleanliness, safety, and economic efficiency. In such situation, the power distribution section of Kansai Electric Power settled four themes for major technical development and has been promoting them. Four themes are as follows; to develop a total automation system for power distribution, to promote 20kV/400V-class power distribution, to develop techniques to form facilities harmonizing with local amenity, and to make business management efficient with the advanced NC system. 3 figs., 4 tabs.

  13. Forecasted electric power demands for the Delmarva Power and Light Company. Volume 1 and Volume 2. Documentation manual

    International Nuclear Information System (INIS)

    Estomin, S.L.; Beach, J.E.

    1990-10-01

    The two-volume report presents the results of an econometric forecast of peak load and electric power demands for the Delmarva Power and Light Company (DP ampersand L) through the year 2008. Separate sets of models were estimated for the three jurisdictions served by DP ampersand L: Delaware, Maryland and Virginia. For both Delaware and Maryland, econometric equations were estimated for residential, commercial, industrial, and streetlighting sales. For Virginia, equations were estimated for residential, commercial plus industrial, and streetlighting sales; separate industrial and commercial equations were not estimated for Virginia due to the relatively small size of DP ampersand L's Virginia Industrial load. Wholesale sales were econometrically estimated for the DP ampersand L system as a whole. In addition to the energy sales models, an econometric model of annual (summer) peak demand was estimated for the Company

  14. Optimal charging scheduler for electric vehicles on the Florida turnpike : final research project report.

    Science.gov (United States)

    2017-06-01

    This project developed a methodology to simulate and analyze roadway traffic patterns : and expected penetration and timing of electric vehicles (EVs) with application directed : toward the requirements for electric vehicle supply equipment (EVSE) si...

  15. Market (in)efficiency in valuing electric utilities-The case of Norwegian generating companies

    International Nuclear Information System (INIS)

    Kjaerland, Frode

    2010-01-01

    After deregulation of the energy market in Norway, a number of mergers and acquisitions of hydropower generating companies have taken place. However, valuation of these companies has proved controversial. From an ex-post perspective, there is support for the criticism that generation assets have been sold too cheaply. This article presents a simple valuation model providing evidence of how value has evolved. On the basis of these results, we discuss the valuation from an ex ante perspective and in the light of the market efficiency hypothesis of (Fama, 1970) and (Fama, 1991).

  16. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  17. Algoritma Heuristik untuk Menentukan Biaya Crashing Minimum pada Project Network dengan Dua Jalur Kritis: Studi Kasus Proyek Produksi Electrical House oleh PT X

    Directory of Open Access Journals (Sweden)

    Berry Yuliandra

    2016-04-01

    Full Text Available PT X is a company engaged in the production of the module, ship relay station (Electrical Houseas well as oil and gas mining equipment. The company uses a project-based production system in the production process of that equipment. Type of project usually performed is the Engineering-Procurement-Construction (EPC project. EPC is a type of project that involves process engineering, material procurement, and products construction. PT X main product is a module or electrical house (E-House. Activities can be disrupted by a variety of conditions in the project implementation phase, such as weather and other unforeseen events. These conditions can hamper the process and affect the performance on the field.Activity scheduling and load out process which often suffer from delays caused project deadlines are often past the limit is given by the client. As in the case of E-House project examined in this study, its implementation has been delayed and should be accelerated for 8days. Therefore, the crashing project can greatly assist in adjusting the implementation plan with the actual condition. Crashing project analysis conducted based on project network diagram. The critical path is determined using Critical Path Method (CPM. Based on analysis results, project execution time can be shortened up to 8 days earlier. (From the normal time of 94 days to 86 days at the cost $ 4.203.093,25.

  18. Communications architecture for an electric company, European utility communications architecture, EURUCA

    Energy Technology Data Exchange (ETDEWEB)

    Uuspaeae, P [VTT Energy, Espoo (Finland)

    1998-08-01

    The scope of this research is integration and interoperability of various information systems and data communications for electric utilities. Utility Communication Architecture refers to an overall view of the communications needs and communication systems in an electric utility. The objective is to define and specify suitable and compatible communications procedures within the Utility and also to outside parties

  19. The adaptation of the major network companies to the liberalization of the electricity in Europe: comparison between France and Germany

    International Nuclear Information System (INIS)

    Courivaud, H.

    2001-01-01

    The liberalization of network activities is a factor which is now topical within France, Europe and the rest of the world. The main economic thinking at the dawn of the 21. century is full of praise for the emergence of heightened competition, which ensures optimal allocation of investments within the electricity industry, brings down prices for the benefit of both minor and major consumers alike, and finally stimulates innovation and creativeness on the part of companies. Curiously, it seems to overlook the fact that the staged introduction of monopolies and the establishment of exclusive rights in favour of certain operators several decades ago offered all of the same economic advantages. In addition to this, it rarely mentions the political and social effects of such changes, as if the latter are the subject of some major consensus within the public opinion. Whatever the circumstances, as a result of globalization, the major electricity network companies have decided either by themselves or following recommendations by the legislators to internationalize and to carry out acquisitions, enhancing market forces which up to the present remained latent. In Europe, this adaptation is not uniform in nature however. It needs to take full account of national and international characteristics regarding the economic and social organisation of the Member States of the European Union, and should certainly not be allowed to sidestep certain democratic requirements and the observance of basic rights other than those related to the freedom to do business. These include respect for the environment, consultation with the social partners within the company and outside, respect for the rights of consumers' and in particular those without any power in the marketplace, not to mention respect for the dignity of those involved in social life. The necessity of reconciling the new opportunities for open competition created through liberalization and respect for basic rights does not seem

  20. Coordination of Project and Current Activities on the Basis of the Strategy Alignment Metamodel in the Oil and Gas Company

    Directory of Open Access Journals (Sweden)

    R. Yu. Dashkov

    2017-01-01

    Full Text Available Purpose: the purpose of this article is to describe the Strategy Alignment Metamodel of the project and current activities, which allows us to connect the Goals and Strategies for Phases of the project with the Goals and Strategies of the company at all levels of the organization through targeted measurement and application of Interpretive Models. Building Networks of Goals and Strategies, and adopting organizational solutions, you coordinate the interaction of the Project office and departments of the company. This methodology is based on a Logical Rationale of the Contexts and Assumptions for establishing Goals and Strategies both for the project and for the company, and on preparation of Contexts and Assumptions, Goals and Strategies Alignment Matrices, which provides a flexible adaptation to the internal and external environment in the process of selecting the most successful Strategies to achieve the Goals. Methods: this article is based on the concept of Goals-Questions-Metrics+ Strategies, which is adapted as another concept of strategic monitoring and control system of projects: Goals-Phases-Metrics+Strategies. These concepts have formed the basis of the Strategy Alignment Metamodel, where a technology of Phases Earned Value Management is used as a measurement system for the project activity, and Balanced scorecard is applied for current operations. Results: strategy Alignment Metamodel of the project and current activities of the company is proposed hereby. It uses modern strategic monitoring and control systems for projects: Goals-Phases-Metrics+Strategies, and for the company: Goals-Questions-Metrics+ Strategies. The interaction between these systems is based on Contexts and Assumptions, Goals and Strategies Alignment Matrices. The existence of such matrices greatly simplifies management decisions and prevents the risk of delays in the execution of project Phases based on rational participation and coordination of the company

  1. 77 FR 14010 - Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC...

    Science.gov (United States)

    2012-03-08

    ..., EG12-18-000, EG12-19-000, EG12- 20-000, EG12-21-000, EG12-22-000, EG12-23-000] Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC, Minco Wind Interconnection Services, LLC, Shiloh III Lessee, LLC, California Ridge Wind Energy LLC, Perrin Ranch Wind, LLC, Erie Wind...

  2. An empirical study on the critical success factors of small to medium sized projects in a South African mining company

    Directory of Open Access Journals (Sweden)

    Du Randt, Francois Jean

    2014-08-01

    Full Text Available Projects that fail, for whatever reason, can impact negatively on society, organisations, and other stakeholders. A number of researchers have identified various critical success factors (CSFs that can influence the outcome and success of a project. This research therefore aims to determine the CSFs that influence various success measures of small- to medium-sized projects at a South African mining company, Exxaro Resources’ Grootegeluk Coal Mine. Other objectives of this research include determining the extent of the impacts of these CSFs on the different success measures of a project. The investigation suggests that there are correlations among CSFs, and that certain factors impact the outcome of projects far more than others. This research finds that the single most important CSF for small- to medium-sized projects is the selection of a competent project manager. The competent project manager is characterised by a group of interrelated CSF factors: good leadership, commitment, and learning from past experiences. Based on the research results, other CSFs are discussed and explored in order for recommendations to be made on how this mining company, and possibly other organisations, can achieve greater project success.

  3. Performance indices of project companies virtual divisions in the construction in CAD conditions

    Directory of Open Access Journals (Sweden)

    Sinenko Sergey

    2017-01-01

    Full Text Available At the present time we consider the construction operations development triggered by the modern technologies development. The electronics, robotics, artificial intelligence, wireless technologies and more became the present-day production attribute. The creation of virtual organizations has become the expected solution of business communities. Following in the footsteps of information boom, in this article we consider the problem of construction field virtualisation, in particular: characteristics of virtuality and virtual structures operation, in-virtual organization work peculiarities, difficulties faced by the company manager with such form of work and criteria for the assessment of organization efficiency. The virtual organization is deemed to be the voluntary cooperation form of partners, aimed at project work type. This is the unique team, the basic resources of which are time and technologies. In general such organization does not have any geographical origin and it works using the Internet. In the context given herein, the virtual structure is considered in CAD conditions that is based on the high degree of construction field IT. Specific relations between the employees make the impact on the work process, therefore a number of both subjective (social, individual, etc. and objective (financial indices are given.

  4. Bill project modified by the Senate on a new organisation of the electricity market

    International Nuclear Information System (INIS)

    2010-01-01

    This report contains the modifications introduced by the French Senate in a bill project voted by the National Assembly which addresses a new organization of the electricity market. Several aspects are treated in this text: the freedom of choice of the electricity provider, the sale and the conditions of sale of electricity by EDF to other electricity providers, the maximum volume a provider can buy and its evaluation, the electricity price determination, the provider obligations, and so on

  5. Low Temperature Noise and Electrical Characterization of the Company Heterojunction Field-Effect Transistor

    Science.gov (United States)

    Cunningham, Thomas J.; Gee, Russell C.; Fossum, Eric R.; Baier, Steven M.

    1993-01-01

    This paper discusses the electrical properties of the complementary heterojunction field-effect transistor (CHFET) at 4K, including the gate leakage current, the subthreshold transconductance, and the input-referred noise voltage.

  6. Weight restrictions on geography variables in the DEA benchmarking model for Norwegian electricity distribution companies

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Endre; Bjoerndal, Mette; Camanho, Ana

    2008-07-01

    The DEA model for the distribution networks is designed to take into account the diverse operating conditions of the companies through so-called 'geography' variables. Our analyses show that companies with difficult operating conditions tend to be rewarded with relatively high efficiency scores, and this is the reason for introducing weight restrictions. We discuss the relative price restrictions suggested for geography and high voltage variables by NVE (2008), and we compare these to an alternative approach by which the total (virtual) weight of the geography variables is restricted. The main difference between the two approaches is that the former tends to affect more companies, but to a lesser extent, than the latter. We also discuss how to set the restriction limits. Since the virtual restrictions are at a more aggregated level than the relative ones, it may be easier to establish the limits with this approach. Finally, we discuss implementation issues, and give a short overview of available software. (Author). 18 refs., figs

  7. Modification of reactor installation in the Genkai nuclear power plant No. 1 of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 25, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Genkai nuclear power plant No. 1 of the Kyushu Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kyushu Electric Power Company, Inc., to the Minister of International Trade and Industry on July 24, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  8. Panel presentation: Impact of combination gas/electric companies on the use of natural gas

    International Nuclear Information System (INIS)

    Stalon, C.G.

    1992-01-01

    This paper looks at the advantages and disadvantages of combined gas and electric utilities. It uses a priori reasoning and empirical analysis to present a case that combined utilities actually have the power to do more good for the service area than two separate utilities striving to compete. Unfortunately, the monopoly status of a combined utility may seize the opportunity to maintain the status quo and stop innovation. Based on some simple research, the author found that most combination utilities' electric divisions had higher prices than comparable straight electric utilities, (2) most combination utilities' electric division had higher unit costs than comparable straight electric utilities, and (3) there was no statistical significant difference in price or unit costs between the gas divisions of combination utilities and straight gas utilities. The paper ends with a discussion of policy options and subsequent consequences of preserving the status quo, forced separation of all such combinations, and the review on a case-by-case basis of each combination utility

  9. 76 FR 19334 - Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Motions...

    Science.gov (United States)

    2011-04-07

    .... e. Name of Project: French Meadows Transmission Line Project. f. Location: The French Meadows... strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original... 13.27 miles from PCWA's French Meadows powerhouse switchyard to PCWA's Middle Fork powerhouse...

  10. Kaizen-Driven Approach While Managing Industrial Projects. A Scandinavian Company Succeeds in Eastern Europe

    Directory of Open Access Journals (Sweden)

    Popescu Daniel

    2015-02-01

    Full Text Available Eastern European companies have experienced various and radical transformations, as resultof the economic crises and turbulences, which exposed structural weaknesses. In the meantime, long-term challenges - such as globalization, shift of power centers from the nationallevel to international structures or scarcity of resources - intensify. Given this context, it ismandatory for companies to develop strategies aiming at being competitive.

  11. Battery-Powered Electric and Hybrid Electric Vehicle Projects to Reduce Greenhouse Gas Emissions: A Resource for Project Development

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2002-07-31

    as requiring specific technology improvements or an increase in fuel efficiency. Site-specific project activities can also be undertaken to help decrease GHG emissions, although the use of such measures is less common. Sample activities include switching to less GHG-intensive vehicle options, such as electric vehicles (EVs) or hybrid electric vehicles (HEVs). As emissions from transportation activities continue to rise, it will be necessary to promote both types of abatement activities in order to reverse the current emissions path. This Resource Guide focuses on site- and project-specific transportation activities. .

  12. Construction of Industrial Ecosystem of an Electric Company under Ecological Perspective

    Science.gov (United States)

    Li, Xin; Zhang, Yuan; Wu, Han

    2018-01-01

    Be confronted with more and more fierce competition environment, only by constantly integrating, constructing and restructuring internal and external resources as well as capabilities can enterprises adapt themselves to the rapidly changing environment and maintain the advantages of sustained competition. Business competition has changed from product competition of single enterprise to competition of bussiness ecosystem. Therefore, how to build a business system is the key to win competition. This paper draws lessons from business ecosystem and industrial ecosystem concept and takes the subordinate industry company of a large enterprise as the research object. On the the basis of combing its characteristics and organizational structure, an industrial ecosystem is tired to constructed.

  13. Prediction and optimization methods for electric vehicle charging schedules in the EDISON project

    DEFF Research Database (Denmark)

    Aabrandt, Andreas; Andersen, Peter Bach; Pedersen, Anders Bro

    2012-01-01

    project has been launched to investigate various areas relevant to electric vehicle integration. As part of EDISON an electric vehicle aggregator has been developed to demonstrate smart charging of electric vehicles. The emphasis of this paper is the mathematical methods on which the EDISON aggregator...

  14. Deploying Electric Vehicles and Electric Vehicle Supply Equipment: Tiger Teams Offer Project Assistance for Federal Fleets

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-02

    To assist federal agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory’s EVSE Tiger Teams.

  15. 78 FR 25069 - South Carolina Electric & Gas Company; Notice of Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-04-29

    ... Murray Docks, Inc./Windward Point Yacht Club to use project waters to expand an existing boat dock.... The proposed new structures would be for the private use of members of the Windward Point Yacht Club...

  16. Productivity, pricing policy and investments in French and British nationalized electric companies

    International Nuclear Information System (INIS)

    Chick, Martin; Huret, Romain

    2003-01-01

    This is a comparative study of the development of, and interaction between, pricing, investment and productivity in the nationalised electricity industries in the United Kingdom and France between 1945 and 1973. The paper concentrates on examining why the rate of diffusion of marginal approaches to pricing and investment was faster in France than in the UK, although it notes that, in theory at least, the coverage of marginalist ideas was greater in the UK than in France by the late 1960's. The paper highlights the influence of French engineers and economists such as Marcel Boiteux and Pierre Masse on the development of applied public economics in the UK, and suggests that the experiences of 1945- 1973 were to have a significant long-term impact on subsequent attitudes towards privatisation and the promotion of competition in the electricity industry in each economy

  17. CORPORATE GOVERNANCE IN THE INTEGRATED REPORTING FRAMEWORK: DISCLOSURE OF BRAZILIAN COMPANIES PARTICIPANTS IN THE PILOT PROJECT

    Directory of Open Access Journals (Sweden)

    Ana Cristina Silva Abreu

    2016-07-01

    Full Text Available This paper analyzes how Brazilian companies adhered the IIRC’s framework for integrated reporting, regarding the content element of corporate governance. The 2013 annual reporting of each company were analyzed consonants to the IIRC's framework using qualitative analysis. Categories were created for adherence of information provided by companies and applied content analysis for this purpose. Results suggest that the framework, although not being adopted integrally by the companies, was used as guide for their disclosure practices. Among other observed results for each of framework topics, BRF S.A, CPFL Energia and Itaú Unibanco disclosure practices featured as examples of adherence for the IIRC model and the inherent principles integrated in the report.

  18. Neighborhood electric vehicle market test development project: Sacramento electric transportation consortium Ra 93-23 program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Warf, W.R.

    1997-02-01

    The neighborhood electric vehicle (NEV) niche is the object of this market and product test project. The project availed itself of a limited production three wheel, single passenger low performance NEV designed and produced in Denmark to determine the acceptability of the design for production and use in North America. This vehicle, as well as a prototype four wheel vehicle designed and constructed through this project, are entirely reinforced plastic chassis and body. Pacific Electric Vehicles was the primary participant in the Project. Included are the evaluation of drive system components, battery charging schemes, body and chassis and glazing material suitability. The project determined and/or verified many of the realities of motor vehicle development and usage in the U.S., which remain more restrictive than elsewhere. Statistical usage data, maintenance requirements, and user experiences are reported and analyzed.

  19. On the legal nature of electricity supply contracts concluded by electricity companies and power stations generating electricity from renewable energy sources

    International Nuclear Information System (INIS)

    Herrmann, B.J.

    1998-01-01

    Section 2 of the German Act for enhanced use of electricity from renewable energy sources (StEG) defines the obligation to contract but not the contractual obligations, i.e. the conditions of performance of the contract (supply and purchase of electricity and the legal obligations of contractors). The analysis here shows that characterising this mandatory contract required by the act as an agreement of purchase and sale more appropriately describes the legal nature of the contract and the intent of the legislator than other contracts for supply and purchase of electricity, as for instance those concluded by electric utilities and their customers. One specific aspect elaborated by the author is that the StEG does not constitute an obligation to supply on the part of the renewable energy generating power station, so that the power station operator is not obliged to ensure availability of the electricity at any time or in terms of supplies that can be called off by the purchasing utility, whereas the electric utility is obliged by section 2 of the StEG to purchase the contractual amounts from the generating station. (orig./CB) [de

  20. Comprehensive Evaluation for Operating Efficiency of Electricity Retail Companies Based on the Improved TOPSIS Method and LSSVM Optimized by Modified Ant Colony Algorithm from the View of Sustainable Development

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-03-01

    Full Text Available The electricity market of China is currently in the process of a new institutional reform. Diversified electricity retail entities are gradually being established with the opening of the marketing electricity side. In the face of a complex market environment and fierce competition, the operating efficiency can directly reflect the current market position and development of electricity retail companies. TOPSIS method can make full use of the information of original data, calculate the distance between evaluated objects and the ideal solutions and get the relative proximity, which is generally used in the overall department and comprehensive evaluation of the benefits. Least squares support vector machine (LSSVM, with high convergence precision, helps save the training time of algorithm by solving linear equations and is used to predict the comprehensive evaluation value. Considering the ultimate goal of sustainable development, a comprehensive evaluation model on operating efficiency of electricity retail companies based on the improved TOPSIS method and LSSVM optimized by modified ant colony algorithm is proposed in this paper. Firstly, from the view of sustainable development, an operating efficiency evaluation indicator system is constructed. Secondly, the entropy weight method is applied to empower the indicators objectively. After that, based on the improved TOPSIS method, the reverse problem in the evaluation process is eliminated. According to the relative proximity between the evaluated objects and the absolute ideal solutions, the scores of comprehensive evaluation for operating efficiency can then be ranked. Finally, the LSSVM optimized by modified ant colony algorithm is introduced to realize the simplified expert scoring process and fast calculation in the comprehensive evaluation process, and its improved learning and generalization ability can be used in the comprehensive evaluation of similar projects. The example analysis proves

  1. Critical success factors for BOT electric power projects in China: Thermal power versus wind power

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, Zhen-Yu. [School of Business Administration, North China Electric Power University, Beijing 102206 (China); Zuo, Jian; Zillante, George [School of Natural and Built Environments, University of South Australia, Adelaide 5001 (Australia); Wang, Xin-Wei [Shandong Nuclear Power Equipment Manufacturing Co. Ltd, Haiyang, Shandong 265118 (China)

    2010-06-15

    Chinese electric power industry has adopted Build-Operate-Transfer (BOT) approach in a number of projects to alleviate the pressure of sole state-owned investment. The Chinese government has taken enormous efforts to create an environment to facilitate the application of BOT approach in electric power projects. Moreover, the growing attention on the sustainability issues puts the traditional major source of electricity - thermal power project under more strict scrutiny. As a result, various renewable energy projects, particularly the wind power projects have involved private sector funds. Both thermal power and wind power projects via BOT approach have met with a varying degree of success. Therefore, it is imperative to understand the factors contributing towards the success of both types of BOT power projects. Using an extensive literature survey, this paper identifies 31 success factors under 5 categories for Chinese BOT electric power projects. This is followed by a questionnaire survey to exam relative significance of these factors. The results reveal the different levels of significance of success factors for BOT thermal power projects versus wind power projects. Finally, survey results were analyzed to explore the underlying construction and distributions among the identified success factors. This study provides a valuable reference for all involved parties that are interested in developing BOT electric power projects in China. (author)

  2. Planning and administration of human resources in Brazilian Electric Power Companies; Planejamento e administracao de recursos humanos nas empresas brasileiras do setor de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Devanir Vieira

    1985-12-01

    Administration and planning of human resources in Brazilian Companies of Electric Power Sector analyzes the evolution of the concept of business planning. This work explore the specific literature of this theme, giving emphasis in predict methods and human resources development and planning models. Is also presented a case study, realized in 1979, which comprehended 84 % of Brazilian Energy Companies. This study aims to evaluate the results of an implementation of this planning and development models 64 refs., 12 figs., 22 tabs.

  3. The DuPont, Monsanto, General Electric open-quotes Lasagnaclose quotes Remediation Project - joint R ampersand D and financing

    International Nuclear Information System (INIS)

    Palmer, P.A.

    1995-01-01

    The Lasagna project is the first of what we expect will be several large cooperative projects between industry consortia and government to develop improved remediation technologies. In 1992, Monsanto Company began contacting other major corporations to see if they were experiencing similar difficulties in applying cost-effective, or even workable technologies for industrial site remediation. Both General Electric and DuPont were early participants in the effort to develop a meeting with the EPA to discuss technical problems faced in cleanup, research needs, and ways to accelerate development of more cost-effective techniques. This paper provides some background on how this cooperative process came to reality, what the Lasagna process is and how the cooperative arrangements and financing are structured

  4. The sustainable car company - or the comeback of the electric car

    Energy Technology Data Exchange (ETDEWEB)

    Sticher, Georg; Rizoulis, Dimitrios [The Boston Consulting Group, Muenchen (Germany)

    2008-07-01

    Every day there are article published about the future of propulsion technology. Opinions are diverging: 'We'll sell nothing but hybrids by 2020' says one automotive executive; whereas for another power train executive ''Hybrids are a violation of physics'. The topic has moved beyond specialized automotive magazines and is strongly emotionalized: Hollywood stars appear driving hybrid vehicles and a documentary film charges the automotive industry as guilty for conspiring against and 'killing the electric car'. Those emotional discussions are largely driven by the announcement of many new vehicles powered by hybrid-electric power trains, fuel cells or batteries. The public is overwhelmed by announcements and can hardly tell concept vehicles from production announcements apart. One core aspect of sustainability is the reduction of CO2 emissions and the increase of vehicle efficiency. The electrification of the vehicle will have to be an integral part of every OEMs and suppliers' portfolio. But without adequate incentives of consumers to purchase the cars and of utilities and/or private investors to provide the necessary infrastructure, the emergence of the electric vehicle may be off to another false start. We do want to offer a structured, multi-stakeholder view in an attempt to de-mystify this rather complex topic. To this, we will present facts on what drives the need for change in the propulsion systems market, what are the viable technological options, what market scenario is likely for 2020 and what does this entail for the major stakeholders. (orig.)

  5. 76 FR 53672 - South Carolina Electric & Gas Company; Notice of Application for Amendment of License and...

    Science.gov (United States)

    2011-08-29

    ..., as stated by the licensee, is to assist members of the Columbia Sailing Club in boat launching and... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 516-470] South Carolina... documents (original and eight copies) filed by paper should be sent to: Secretary, Federal Energy Regulatory...

  6. Impact of Contingent Liabilities Reclassification on Financial Performance: An Analysis with Brazilian Companies of Electricity Utilities Sector

    Directory of Open Access Journals (Sweden)

    Carlos Henrique Silva do Carmo

    2018-01-01

    Full Text Available The main objective of this research is to verify the effect of a reconfiguration of contingent liabilities in the financial performance of Brazilian companies in the electricity sector in the years 2013 to 2015. The sample consisted of 53 companies and 153 financial statements were analyzed. The model used to reconfigure the contingent liabilities into provisions was developed by Rose (2014. The author classifies the reversal in 5 scenarios: Optimistic (20% Partially Optimistic (40%, moderate (60% Partially Pessimistic (80% and Pessimistic (100%. To represent the economic and financial performance we selected three indicators: General Liquidity (LG, General Indebtedness (EG and Return Over Assets (ROA. The results showed that for worst-case scenarios, there is a significant difference between the indicators calculated on the original data in comparison with those calculated within the reclassified scenarios. The Statistics D of Cohen (1988 pointed out that, in addition to statistically significant, in the worst scenarios, the size effect was also too high, especially for the ROA and the Indebtedness. For Liquidity the differences were not so significant. The findings of this research serve as a warning to users of financial statements and pointed out that they should be aware of the financial effect of different interpretations of the individuals involved in decisions about the likelihood of loss in provision and Contingent liabilities.

  7. THE PROACTIVE MANAGEMENT MODEL OF STRATEGIC DEVELOPMENT PROJECT ON THE ENERGY SUPPLY COMPANIES IN A TURBULENT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Михайло Збишекович ДОМБРОВСЬКИЙ

    2017-03-01

    Full Text Available A methodical approach of proactive project management model with the estimate (prediction deviation of actual results from planned at each control step is proposed. Deviation of actual results from the project planned, which takes place in the management of the energy company transformation project, as a result of action under uncertainty, determines the acceleration of work over the project plan. Implementation the scope of work, which exceeds the plan, as result of overspending of resources and budget, disrupting the stability of the project as a system. The graphic model helps to form the "corridor" tolerance based resource reserve, and the implementation of the project work is carried out according to the extension concept. Clarification allowable deviation area allows improving the model of project proactive management for each of the next execution step. Project management quality is improved by reducing the time of decision-making and increase the sustainability and efficiency by substantially reducing deviations. The conclusions about the benefits of the assessment of works and project resources balance, by using the proactive management model, which allows comparing variants of works dynamics, to implement the search for the best solution to a predetermined set of admissible, have been made.

  8. ALARA cost/benefit analysis at Union Electric company using the ARP/AI methodology

    International Nuclear Information System (INIS)

    Williams, M.C.

    1987-01-01

    This paper describes the development of a specific method for justification of expenditures associated with reducing occupational radiation exposure to as low as reasonably achievable (ALARA). This methodology is based on the concepts of the Apparebt Reduction Potential (ARP) and Achievability index (AI) as described in NUREG/CR-0446, Union Eletric's corporate planning model and the EPRI Model for dose rate buildup with reactor operating life. The ARP provides a screening test to determine if there is a need for ALARA expenditures based on actual or predicted exposure rates and/or dose experience. The AI is a means of assessing all costs and all benefits, even though they are expressed in different units of measurement such as person-rem and dollars, to determine if ALARA expenditures are justified and their value. This method of cost/benefit analysis can be applied by any company or organization utilizing site-specific exposure and dose rate data, and incorporating consideration of administrative exposure controls which may vary from organization to organization. Specific example cases are presented and compared to other methodologies for ALARA cost/benefit analysis

  9. FEATURES OF PROJECT PORTFOLIO OF HIGH TECHNOLOGY INNOVATION COMPANIES IN NANOBIOTECHNOLOGIES

    Directory of Open Access Journals (Sweden)

    Віктор Володимирович МОРОЗОВ

    2015-05-01

    Full Text Available In the article were determined main project peculiarities in the field of nanotechnologies, that significantly influence project management in science. Was shown the necessity to apply the methods of project management for realization of innovative projects, aiming to accelerate their fastest implementation in the most prominent directions of state national economy.

  10. Resolution 519/012. It is allowed to R DEL SUR S.A company to generate a wind electricity source by a generating power plant placed in Maldonado province 2nd and 4th Catastral section, as well as the connection to the Interconnected National System

    International Nuclear Information System (INIS)

    2012-01-01

    The Resolution 519 is according to the Electric Wholesale Market regulation and it authorizes the power generation using the wind as the primary source. The company who presented this project was R DEL SUR S.A with the aim to instal a wind power plant in Maldonado province.

  11. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Science.gov (United States)

    2010-05-17

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Juniper Canyon I Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION... would be generated from their proposed Juniper Canyon I Wind Energy Project (Wind Project) in Klickitat...

  12. Impact of Ontario electricity industry structure on the viability of cogeneration projects

    International Nuclear Information System (INIS)

    Chuddy, B.

    1999-01-01

    A review of Ontario Hydro's existing market structure and how its move toward a more competitive profile can be advantageous for cogeneration projects was presented. Ontario's existing electric power supply is as follows: 6 fossil fuels stations generate a total of 9, 969 MW of electricity, 23 NUG stations generate 1,541 MW, 3 nuclear stations generate a total of 9,028 MW and 69 hydro-electric stations generates 6,751 MW of electricity. The criteria and characteristics for cogeneration projects were listed. The paper also discussed other topics such as the market price of power, outstanding regulatory issues, market volatility and relative pricing. The prognosis for Ontario cogeneration projects for the early years from 1999-2004 is that for economic reasons, only big projects with large loads of 200 to 800 MW will be considered. In later years, other projects will become economic

  13. Troubleshooting the General Electric Company Neutron Devices Department's deionized water system

    International Nuclear Information System (INIS)

    Gillespie, T.J.

    1983-01-01

    In May 1982, the General Electric Neutron Devices Department's deionized (DI) water system was found to be highly contaminated with fresh water roundworms which caused severe filter plugging problems. Subsequently, a DI water improvement program was developed by GEND's Process Technology, Contamination Control, and Facilities Engineering groups. This program included removal of dead ends in the distribution system, a consultant's review, significant modification of the DI water system, modification of system operation, design of a quality plan, and changes in the types of water analysis. During implementation of the improvement program, a severe bacteria contamination problem occurred due to a contractor accident. Correction of this problem required sterilization of portions of the DI water system and significant modification of the water filtration system. The system modifications and sterilization procedures have significantly reduced bacteria and total solids contamination while resistivity is generally increasing

  14. Does weather explain cost and quality performance? An analysis of UK electricity distribution companies

    International Nuclear Information System (INIS)

    Yu, William; Jamasb, Tooraj; Pollitt, Michael

    2009-01-01

    In recent years, a number of empirical studies and energy regulators have applied benchmarking techniques to measuring the efficiency and performance of network utilities. An important issue has been the extent to which the results are influenced by contextual factors. Among these, weather factors are frequently discussed as being important. We use factor analysis and two-stage data envelopment analysis techniques to examine the effect of a set of important weather factors (gale, hail, temperatures, rainfall and thunder) on the performance of electricity distribution networks in the UK. The results indicate that such factors often do not have a significant economic and statistical effect on the overall performance of the utilities. The weather parameters in some models are significant in terms of economic efficiency. The results echo our previous findings of the importance of extending the basic model to include other inputs such as total expenditure (Totex), customer minutes lost (CML) and network energy losses in regulatory benchmarking.

  15. Use and benefit summary of General Electric Company thermocase insulated tubulars for steam enhanced oil recovery

    Energy Technology Data Exchange (ETDEWEB)

    Traynor, B.V. Jr.; Hawley, J.R.; Marziani, V.J.; Prevost, W.M.

    1982-01-01

    General Electric Co.'s (GE) first well-bore insulation in 1969 resulted from the industry's need to produce hot oil on Alaska's North Slope without damaging the permafrost. In the past 3 yr, over 500,000 linear ft of GE's Thermocase has been sold. Thermocase tubulars are in use in California, Wyoming, Texas, Canada, Venezuela, and the USSR. Thermocase insulated tubulars are being used in a wide range of reservoirs under a variety of completion designs. This study discusses field experience, thermal completion benefits afforded by Thermocase tubulars, a quantified economic evaluation in a 1000-ft application, as well as GE's product verification, test and rigid quality control program.

  16. Report on the bill project on a new electricity market organisation in France (n. 2451)

    International Nuclear Information System (INIS)

    2010-01-01

    This document reports the works of the Economic Affairs Commission of the French National Assembly on a bill project dealing with a new organisation of the electricity market. It reports the hearings of the Energy regulation commission Chairman and of the EDF Chairman, the general discussion of the Commission, and the discussion on the different bill articles. These articles are dealing with the access of electricity providers to the electricity produced by EDF, capacities required for electricity providers, power reservation contracts, and other regulatory aspects. A table compares the present situation, the content of the bill project, and the Commission's propositions

  17. ANALYSIS OF THE POSSIBILITY FOR ESTABLISHING PROJECT MANAGEMENT OFFICE (PMO IN COMPANIES IN SERBIA

    Directory of Open Access Journals (Sweden)

    Dragana Milin

    2012-09-01

    Full Text Available Project Management Office (PMO is an organizational unit established to help project managers, project teams and the various levels of management in carrying out the principles of project management. The research was carried out in Serbia, in 2011, with the aim to establish which methodologies and techniques are used for project m anagement, and which of them are used the most frequently. Furthermore, the need for establishment of PMOs in Serbia is discussed. These offices should help in establishing a standardized methodology (at the organization level and thus overcome the obviou s poor use of any project management methodology at all.

  18. An inventory control project in a major Danish company using compound renewal demand models

    DEFF Research Database (Denmark)

    Larsen, Christian; Seiding, Claus Hoe; Teller, Christian

    2008-01-01

    procedures for determining suitable inventory control variables based on the fitted demand distributions and a service-level requirement stated in terms of an order fill rate. Finally, we validated the results of our models against the procedures that had been in use in the company. It was concluded...

  19. Det europæiske Model Company Law Act Project

    DEFF Research Database (Denmark)

    Andersen, Paul Krüger; Baums, Theodor

    2008-01-01

    På initiativ af forfatterne til det følgende blev der i 2007 dannet en europæisk gruppe af fremtrædende selskabsretseksperter med henblik på at udforme en »European Model Company Law Act« (EMCLA). Gruppen holdt sit første møde i Århus i september 2007.  ...

  20. Vegetable breeding innovation in China and the Netherlands : a study at sectoral, company and project level

    NARCIS (Netherlands)

    Liu, Z.

    2013-01-01

    The seed business plays a crucial role at the basis of the food supply chain, and companies which are active in plant breeding and production and sales of seeds are embedded in a competitive environment. They continuously face challenges to develop higher yielding varieties with better or new

  1. Optimization of portfolio of contracts for companies of electric power generation

    International Nuclear Information System (INIS)

    Gunn, Laura Keiko; Silva, Elisa Bastos; Correia, Paulo de Barros

    2010-01-01

    Portfolio optimization is a technique widely used to select investments in economic and financial zones. In the Brazilian Electric Market the portfolio models must consider not only different types of contracts used in the free market, but also different types of markets: the free market, the captive market and the spot market. Normally, the question is knowing which proportion of energy should be sold in each market, in order to maximize the return and minimize the risk. This article deals with a problem from the point of view of a power generator, where their objective is to maximize its profit, to serve their obligations regarding the delivery of energy and minimizing the risk associated with the occurrence of Spot Price - minimum (Spot Price). It is considered that the generator has flexible contracts and inflexible contracts to sell the energy. Inflexible contracts have delivery obligations of fixed energy and flexible contracts allow, the holder of the flexibility, to deliver or to receive an amount of variable energy. In this case, the holder of flexibility may be the purchaser or the generator. (author)

  2. Outages of electric power supply resulting from cable failures Boston Edison Company system

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  3. Quality Management in Project Management Consulting. A Case Study in an International Consulting Company

    OpenAIRE

    Ceptureanu, Eduard-Gabriel; Ceptureanu, Sebastian-Ion; Luchian, Cristian-Eugen; Luchian, Iuliana

    2017-01-01

    The present paper addresses quality management from the specific perspective of project management consulting service providers, in the framework of large infrastructure projects. Because of their supposed superiority in knowledge and experience, project management consultants have an ultimate responsibility for the proper implementing of the project. Therefore, quality management in consulting organizations should focus on critical success factors. As there is no consensus yet regarding the ...

  4. Westinghouse electric company, LLC regulatory trends in the USA nuclear power industry

    International Nuclear Information System (INIS)

    Molnar, C. M.; Cheung, A. C.; Gresham, J. A.

    2007-01-01

    The United States (US) nuclear industry is in a dynamic, exciting, and challenging time. On one hand, since the mid 90s, the US nuclear utilities have continued to demonstrate improved safety, efficient and reliable operation for the whole nuclear fleet, thus making generation costs for nuclear energy extremely attractive. On the other hand the US utilities are projecting the need to add significant new generation capacities to replace the aging fleet and to sustain the expected economic growth. In addition to the demonstrated improved operation and financial performance, the financial incentives offered in the federal energy bill passed in 2005 enticed many utilities to actively consider the purchase of new nuclear power plants. This paper will highlight the regulatory trends in the USA, the major initiatives and improvements undertaken as well as other operation support issues faced by the US nuclear power industry

  5. Valuation of investment projects by an international oil company: a new proof of a straightforward, rigorous method

    International Nuclear Information System (INIS)

    Pierru, A.; Babusiaux, D.

    2009-02-01

    The problem studied is that of valuing investment projects of an international oil company subject to tax schemes that vary from one country to another. The existing disparities in the tax treatment of interest paid can lead the firm to seek an optimal allocation of its debt capacity among the various projects. In this context, the generalized ATWACC (After-Tax Weighted Average Cost of Capital) method presents numerous advantages over standard methods and is particularly well suited to the valuation of oil-field development projects where debt financing differs from the amount that would correspond to the debt ratio targeted by the firm at the corporate scale. In this paper, we discuss adapting the generalized ATWACC method to the specificities of the oil industry and offer new proof of its validity, based on a model that maximizes, under constraints, the firm's equity value. (authors)

  6. 2015 Plan. Project 2: the electric power sector and the Brazilian economy: insertion and forecasts

    International Nuclear Information System (INIS)

    1993-05-01

    This project shows the economic and the energetic view of the Brazilian electric power sector, mentioning the actual conjuncture; the economy evolution; some sector forecasts; demographical aspects; international price of petroleum and National Energetic Matrix. (C.G.C.)

  7. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Science.gov (United States)

    2010-02-05

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for...

  8. Analytic Hierarchy Process-Based Analysis to Determine the Barriers to Implementing a Material Efficiency Strategy: Electrical and Electronics’ Companies in the Malaysian Context

    Directory of Open Access Journals (Sweden)

    Fu Haw Ho

    2016-10-01

    Full Text Available Material efficiency is one of the most important strategies for helping manufacturing companies achieve sustainability in their production activities. However, there are many barriers to the implementation of material efficiency strategies in the manufacturing processes and overall business operations. The aim of this study is to identify and evaluate the barriers faced by Electrical and Electronics (E&E manufacturing companies in Malaysia in implementing material efficiency strategies. A mixed-mode research method was employed to collect data from these companies. Semi-structured interviews were used to identify the barriers faced by the Malaysian Electrical and Electronics (E&E industry, while an Analytic Hierarchy Process (AHP survey was utilized to determine the importance of each barrier. Seven companies participated in the semi-structured interviews, and 18 companies took part in the AHP survey. Nine barriers were generated from analysis of the interviews, and were then ranked by priority using the AHP method. These important findings could be used as a guide for E&E companies in managing or overcoming barriers during the implementation of material efficiency strategies and other sustainable manufacturing activities.

  9. Inquiry relating to modification of reactor installation of Hamaoka No. 2 nuclear power plant of Chubu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modification of reactor installation of the Hamaoka No. 2 nuclear power plant, Chubu Electric Power Company, Inc., on February 8, 1979, from the president of the company. After the safety evaluation in the Ministry of International Trade and Industry was finished, inquiry was conducted to the head of the Atomic Energy Safety Commission (AESC) on May 25, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on May 28, 1979. The modification of the reactor installation is the increase of spent fuel storage capacity from about 220% of in-core fuel at present to about 325%. The fundamental philosophy of the safety evaluation includes the following items; 1) the storage capacity of spent fuel is adequate, 2) the design is such that the criticality is prevented under any assumed condition, 3) the sufficient cooling capacity is kept for decay heat removal, 4) and others required for the safety. The contents of the safety examination for each philosophical item written above are presented. The increased spent fuel storage capacity is equivalent to the quantity produced in about eight years. The prevention of criticality in the spent fuel storage is carefully practiced by putting fuel assemblies in the stainless steel racks with large neutron absorption cross section and locating spent fuel assemblies at the proper distances. The effective multiplication factor is less than 0.95 at the most severe arrangement in the fuel pool. The water temperature in the pool is less than 65 deg C at about 325% core storage by operating the spent fuel pool water cooling system. The spent fuel storage racks are designed as the A class aseismatic structure. (Nakai, Y.)

  10. The new tariff model based on marginal costs developing concept for Brazilian electric sector. A case study for Power and Light Company of Sao Paulo State (Brazil)

    International Nuclear Information System (INIS)

    Correia, S.P.S.

    1991-01-01

    A new methodology for power generation cost accounts in Brazilian electric sector is described, with the application of marginal costs theory and its deviation in developing economies. A case report from a Brazilian Power and Light Company is studied, focalizing the seasoning, the planning, the tariff model and the power generation, transmission and distribution. (M.V.M.). 19 refs, 28 figs, 1 tab

  11. Applicability of PSD Requirements to the Wisconsin Electric Power Company Port Washington Life Extension Project

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. 78 FR 52574 - Westinghouse Electric Company, LLC; Decommissioning Project; Hematite, Missouri

    Science.gov (United States)

    2013-08-23

    ... request is granted, including the identity of any expert, consultant, or assistant who will aid the... shown by reliance on a qualified expert, consultant, or assistant who satisfies these criteria. (b) A... requests for access to SUNSI or SGI, and motions for protective orders, in a timely fashion in order to...

  13. 77 FR 16077 - License Amendment Request From Westinghouse Electric Company, LLC, Hematite Decommissioning Project

    Science.gov (United States)

    2012-03-19

    ... request is granted, including the identity of any expert, consultant, or assistant who will aid the... party or its counsel may be shown by reliance on a qualified expert, consultant, or assistant who... timely fashion in order to minimize any unnecessary delays in identifying those petitioners who have...

  14. 77 FR 65910 - Westinghouse Electric Company, LLC., Hematite Decommissioning Project, Festus, Missouri

    Science.gov (United States)

    2012-10-31

    ... information previously available; and (iii) the filing has been submitted in a timely fashion based on the... proceeding may, in the discretion of the presiding officer, be permitted to make a limited appearance...

  15. Quality Management in Project Management Consulting. A Case Study in an International Consulting Company

    Directory of Open Access Journals (Sweden)

    Eduard-Gabriel Ceptureanu

    2017-02-01

    Full Text Available The present paper addresses quality management from the specific perspective of project management consulting service providers, in the framework of large infrastructure projects. Because of their supposed superiority in knowledge and experience, project management consultants have an ultimate responsibility for the proper implementing of the project. Therefore, quality management in consulting organizations should focus on critical success factors. As there is no consensus yet regarding the most important aspects of the consulting activity on which depend the achievement of the project aims, there is scope for further investigating this subject. Here, the case of a project management consulting organization involved in large infrastructure projects in Romania, Bulgaria, Moldova, Ukraine and Serbia is analyzed. Data collected through a questionnaire-based survey among international consultants and support personnel suggest that factors related to leadership style and communication skills are more closely tied to the success of the project than more technical aspects. The results constitute an empirical evidence of main success factors for specialized consulting services in project management and can be useful in improving business and project performance and achieving business excellence.

  16. EVALUATION OF E-RECRUITMENT LEVEL AMONG THE LARGEST COMPANIES IN POLAND - PROJECT OF RESEARCH

    Directory of Open Access Journals (Sweden)

    Dorota Buchnowska

    2015-12-01

    Full Text Available The changes taking place in the labor market cause that it is increasingly difficult to recruit employees with the right skills and competencies to companies. To reach the right candidates, they use modern IT solutions, such as ATS (Applicant Tracking System, which are supporting the processes of recruitment. Among others, they enable the publication of job offers on the Internet - on corporate websites, job portals and business social networking services - and apply for jobs online through these channels. This article pre-sents the evolution of the use of the Internet, and particularly the social media, in the recruitment process and presents a projekt of comprehensive research, which aims is to analyze and evaluate of the level of development of e-recruitment in Poland among largest companies.

  17. Mortality in the cohort of nuclear workers of the French electricity company: 1968-2003 period

    International Nuclear Information System (INIS)

    Rogel, A.; Joly, K.; Metz-Flamant, C.; Laurier, D.; Tirmarche, M.; Hubert, D.; Garcier, Y.

    2008-01-01

    years of follow-up were added, this cohort is constituted by relatively young workers, most of them being still in active service. Regular update of the follow up of this cohort together with inclusion of newly employed workers is planned. This project contributes to a better occupational health surveillance and will be included in large international studies aiming to study low risks in relation to ionising radiation. In this frame, individual radiation exposure data will be updated very soon in order to allow an updated exposure-risk analysis. (author)

  18. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  19. Ukraine biosolids incineration project generates electricity while solving disposal problems

    Energy Technology Data Exchange (ETDEWEB)

    Kosanke, J. [Quality Recycling Ltd., Henderson, NC (United States)

    2008-07-15

    This article described an innovative Waste-to-Energy (WtE) system that is currently being installed in the city of Odessa in the Ukraine. The city has a population of 1 million and is a major seaport on the Black Sea. Sewage sludge will be used as a biomass fuel to power an electrical generation plant. The system includes a clean-burning rotary cascading bed combustor (RCBC) linked to a boiler and an electricity-generating steam turbine. The RCBC spins in order to keep fuel cascading for maximum combustion, and is expected to burn over 50,000 tons of dewatered sewage sludge per year while generating 33,507,000 kWh of electricity per individual location. Eleven systems will be installed at major sewage processing modules in the Ukraine. A pilot program is also being conducted to test and monitor the system under United States emissions and operational standards. The RCBC is also being used to combust fuels derived from municipal solid waste (MSW) at a site in Kansas. Other fuels that can be cleanly burned using the RCBC system included high sulfur bituminous coal; anthracite coal waste; carpet and carpet scrap, and tires and rubber wastes. Studies have demonstrated that some toxic wastes can be removed using the RCBC system. It was concluded that burning negative value fuels can allow some power plants to earn revenues from disposal fees. 3 figs.

  20. Evolution of the U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Satchwell, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-08

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a “top-down” approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a “bottom-up” analysis of a database of -3,265 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of an economic recession, the U.S. ESCO industry managed to grow at about 7% per year between 2006 and 2008. ESCO industry revenues are relatively small compared to total U.S. energy expenditures (about $4.1 billion in 2008), but ESCOs anticipated accelerated growth through 2011 (25% per year). We found that 2,484 ESCO projects in our database generated -$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20% of all U.S. ESCO market activity from 1990-2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated -$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. We found that nearly 85% of all public and institutional projects met or exceeded the guaranteed level of savings. We estimated that a typical ESCO project generated $1.5 dollars of direct benefits for every dollar of customer

  1. Real World Projects with Companies Supporting Competence Development in Higher Education

    Science.gov (United States)

    Baaken, Thomas; Kiel, Bert; Kliewe, Thorsten

    2015-01-01

    The department of business administration of Münster University of Applied Sciences (MUAS) in Germany has a long tradition in realising practice-oriented research projects in cooperation with industry. The objective of these cooperative projects is to offer students real-life experiences and to make the theoretical know-how of university lectures…

  2. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    International Nuclear Information System (INIS)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans

  3. Report from investigation committee on the accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    Koshizuka, Seiichi

    2012-01-01

    Government's Investigation Committee on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company published its final report on July 23, 2012. Results of investigation combined final report and interim report published on December 26, 2011. The author was head of accident accuse investigation team mostly in charge of site response, prior measure and plant behavior. This article reported author related technical investigation results focusing on site response and prior measures against tsunamis of units 1-3 of Fukushima Nuclear Power Stations. Misunderstanding of working state of isolation condenser of unit 1, unsuitability of alternative water injection at manual stop of high-pressure coolant injection (HPCI) system of unit 3 and improper prior measure against tsunami and severe accident were pointed out in interim report. Improper monitoring of suppression chamber of unit 2 and again unsuitable work for HPCI system of unit 3 were reported in final report. Thorough technical investigation was more encouraged to update safety measures of nuclear power stations. (T. Tanaka)

  4. Security-constrained self-scheduling of generation companies in day-ahead electricity markets considering financial risk

    International Nuclear Information System (INIS)

    Amjady, Nima; Vahidinasab, Vahid

    2013-01-01

    Highlights: ► A security-constrained self-scheduling is presented. ► The proposed framework takes into account the uncertainty of the predicted market prices. ► We model the risk and profit tradeoff of a GENCO based on an efficient multi-objective model. ► Unit commitment and inter-temporal constraints of generators are considered in an MIP model. ► Simulation results are presented on the IEEE 30-bus and IEEE 118-bus test systems. - Abstract: In this paper, a new security-constrained self-scheduling framework incorporating the transmission flow limits in both steady state conditions and post-contingent states is presented to produce efficient bidding strategy for generation companies (GENCOs) in day-ahead electricity markets. Moreover, the proposed framework takes into account the uncertainty of the predicted market prices and models the risk and profit tradeoff of a GENCO based on an efficient multi-objective model. Furthermore, unit commitment and inter-temporal constraints of generators are considered in the suggested model converting it to a mixed-integer programming (MIP) optimization problem. Sensitivity of the proposed framework with respect to both the level of the market prices and adopted risk level is also evaluated in the paper. Simulation results are presented on the IEEE 30-bus and IEEE 118-bus test systems illustrating the performance of the proposed self-scheduling model.

  5. Role Of E-Government In Delivery Of Public Services In Tanzania Electric Supply Company In Ruvuma Region Tanzania

    Directory of Open Access Journals (Sweden)

    Emmanuel Jackson Petro Gunda

    2015-06-01

    Full Text Available ABSTRACT E-government facilitates delivery of public services of relevant government information in electronic form to citizens in a timely manner and better service delivery to citizens. E-government is a kind of governmental administration which is based on Information Communication and Technology Services. Electronic government describes the use of technologies to facilitate the operation of government and disperse of government information and services. The scope of the work was limited to Tanzania Electric Supply Company Limited TANESCO in Ruvuma region. The population of thirty 31 were selected from a total population of 169 public servants use both purposive and stratified random sampling techniques applied. The major findings of study revealed that about 67.7 of response from respondents agree that ICT infrastructures specifically modern computer connected to internet reliable internet speed well organized organization website power availability in public operation contribute to efficient in delivery of services it also noted by respondents to faster decision making speeding up transaction processing and reduce cost. The study greatly recommends that capacity building to public servants on ICT install and strengthening ICT infrastructures to government organizational are inevitable to realise relevant role of e-government in delivery of public services.

  6. 78 FR 32278 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Science.gov (United States)

    2013-05-29

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to Information in Tier 1, Table... Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal... Table 3.3-1, ``Definition of Wall Thicknesses for Nuclear Island Buildings, Turbine Buildings, and Annex...

  7. Status of the Southern California Edison Company 3 MW Wind Turbine Generator (WTG) demonstration project

    Science.gov (United States)

    Scheffler, R. L.

    1979-01-01

    To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.

  8. INVAP and its project management capabilities: a key to company success

    International Nuclear Information System (INIS)

    Salvatore, Marcelo; Delgado, Ricardo; Niklison, Carlos; Ordonez, Juan Pablo; Gerbino, Juan Jose Gil

    2002-01-01

    Over the past 26 years, several factors have contributed to INVAP's projection into domestic and overseas operations. Of these, the most recognized is of course the technological capabilities INVAP keeps developing to satisfy our customer's requirements. In a second thought, the other factor is the strategic objective of providing specific purpose customer oriented solutions. The less obvious third important factor in this trilogy is the successful application of Project Management techniques and methods. INVAP's vision on Project Management encompasses well known concepts as: Integrated Management, Proactive solutions, Cost Control and Reporting, Quality Assurance, Target Schedules, Performance Requirements, Risk Management, Configuration Management and Integrated Logistic Support. After 2 years of execution of the Replacement Research Reactor Project for the Australian Nuclear Science and Technology Organization, our Project Management methodology have allowed us to timely meet all project milestones, complete basic and detail engineering, timely deliver the preliminary safety reports, manufacture and test technological concepts in specifically built mock ups and overcome risky situations -like the economical panorama in Argentina- without jeopardizing our Contractual commitments. Present paper depicts the practical approach INVAP has for Project Management -particularly within the Nuclear Division-, and a description of the tools to such aim developed. (author)

  9. ) The Application of Remote Sensing to Exploration and Production Projects in Shell Petroleum Development Company for Effective Environmental Management

    International Nuclear Information System (INIS)

    Mpaka, O.E.

    2003-01-01

    Over the years (especially within the last decade) environmental issues have assumed a proportion that the oil industry appeared unprepared for. The oil industry has not been immune from the consequences of the awareness generated by various interest groups world-wide. Environmental Assessment has become an integral part of all projects in Shell Development Company [SPDC] and the remote sensing tool has shown to be vital for effective management of the environment. The Niger Delta operations area covers approximately 70.0002km, an area including mangrove swamps, extensive forest and agricultural development, and most SPDC onshore operations are carried out in this fragile environment. Project citing in this environment requires careful planning and articulation of environmentally friendly and cost effective routes and sites. The implementation of satellite image processing and analysis, using georeferenced multispectral imagery have provided information on vegetation and other land cover types, topography including drainage, and infrastructure. The derived information is used for planning new well locations; flowlines and location access routes; impact assessment and monitoring of the environment. This article discusses how the environment is better managed by applying the remote sensing technology in each project embarked upon in SPDC. Some of he projects discussed include: Forcados CCP, Oluwa-Ore and Awoba-Soku-Bonny gasline routes/site investigation and selection projects Oben, Uzere/Oroni Field Development Planning ;3D Ovio Seismic prospect planning ;Obigbo Pipeline squatter mapping

  10. Basic survey project for Joint Implementation, etc. for energy conservation in ethylene production at Yangzi Petrochemical Company

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a potential study was conducted of energy conservation in Yangzi Petrochemical Company in Nanking City, China. The project is aimed at realizing energy conservation and reduction in greenhouse effect gas emissions by generating power by installation of gas turbine and by using waste gas as fuel for ethylene cracking furnace. In the project, the following are carried out: introduction of 35MW gas turbine generator, and repairs of fuel burner of ethylene cracking furnace, fuel gas compressor of gas turbine, emergency use air blower, duct, etc. The construction work is to be done in 30 months from April, 2005. The initial investment is approximately 45 million US$. The energy conservation to be brought by this project is 37,958 tons/year, or 759,160 tons in the total project term. Further, the reduction amount of greenhouse effect gas emissions is 117,452 CO2 tons/year, or 2,349,040 CO2 tons in the total project term. (NEDO)

  11. Would-Be Solar Electric Homeowners Sought For Project

    Science.gov (United States)

    Energy Laboratory (NREL) and the Colorado Office of Energy Conservation are seeking homeowners interested in becoming part of a market assessment project to evaluate the potential market for rooftop utilities, will assess the market potential and practicality of home photovoltaic systems. The utilities

  12. Projected costs of nuclear and conventional base load electricity generation in some IAEA Member States

    International Nuclear Information System (INIS)

    1990-09-01

    The cost of nuclear and conventional electricity is one of the most important parameters for power system planning, and in particular for decisions on base load power projects. This study reviews the projected levelized electricity generation costs of the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained and evaluated for nuclear and fossil fuelled (mainly coal-fired) plants that could be commissioned in the mid- to late 1990s in 10 IAEA Member States. 27 refs, figs and tabs

  13. The impact of leadership styles on project success: Case of a telecommunications company

    Directory of Open Access Journals (Sweden)

    Tammy Lategan

    2015-06-01

    Full Text Available Challenges within the customer service industry make leadership styles a key factor in the success of customer service project delivery. This research provides an overview of information and knowledge within a corporate environment with an underlying theme of defining leadership styles within the customer service projects environment to ensure successful project delivery. This research aims to investigate the perception of leadership styles required and factors that contribute to successful project delivery effectiveness within a telecommunication customer service environment. A conceptual research model is formulated and is followed by a quantitative research process and analysis. The results of the study identified that employees had a neutral perception to leadership styles however; different leadership styles are important to themselves and the organisation

  14. How a traditional company seeded new analytics capabilities

    NARCIS (Netherlands)

    Gust, G. (Gunther); D. Neumann (Dirk); Flath, C.M. (Christoph M.); T. Brandt (Tobias); Ströhle, P. (Philipp)

    2017-01-01

    textabstractDeveloping state-of-the art data analytics capabilities is a challenge for traditional companies with long-established processes and legacy systems. We describe how one such company (a Swiss electricity utility) conducted a seed project-a bottom-up initiative to develop an analytics

  15. Time-of-use rates vs. Hopkinson tariffs redux: an analysis of the choice of rate structures in a regulated electricity distribution company

    International Nuclear Information System (INIS)

    Seeto, Dewey; Woo, C.K.; Horowitz, Ira

    1997-01-01

    Recent proposals to restructure the electricity industry in North America may effect the disintegration of a vertically integrated company into several smaller entities, including distribution companies (DISCOs) We explore whether time-of-use (TOU) pricing or a Hopkinson tariff would be more suitable for a regulated DISCO. Focusing on the economic efficiency of these alternative rate structures, we argue that a Hopkinson tariff with demand subscription is superior to TOU rates, as it can better handle the limited load diversity of local transmission and distribution (TD) demands made on the contemporary DISCO, while finessing the problem of endogenous marginal costs of local TD capacity. (Author)

  16. Projected Costs of Generating Electricity - 2015 Edition. Executive Summary

    International Nuclear Information System (INIS)

    2015-01-01

    This joint report by the International Energy Agency (IEA) and the Nuclear Energy Agency (NEA) is the eighth in a series of studies on electricity generating costs. As policy makers work to ensure that the power supply is reliable, secure and affordable, while making it increasingly clean and sustainable in the context of the debate on climate change, it is becoming more crucial that they understand what determines the relative cost of electricity generation using fossil fuel, nuclear or renewable sources of energy. A wide range of fuels and technologies are presented in the report, including natural gas, coal, nuclear, hydro, solar, onshore and offshore wind, biomass and biogas, geothermal, and combined heat and power, drawing on a database from surveys of investment and operating costs that include a larger number of countries than previous editions. The analysis of more than 180 plants, based on data covering 22 countries, reveals several key trends, pointing, for example, to a significant decline in recent years in the cost of renewable generation. The report also reveals that nuclear energy costs remain in line with the cost of other base-load technologies, particularly in markets that value de-carbonisation. Overall, cost drivers of the different generating technologies remain both market-specific and technology-specific. Readers will find a wealth of details and analysis, supported by over 200 figures and tables, underlining this report's value as a tool for decision makers and researchers concerned with energy policies, climate change and the evolution of power sectors around the world. (authors)

  17. An inventory control project in a major Danish company using compound renewal demand models

    DEFF Research Database (Denmark)

    Larsen, Christian; Seiding, Claus Hoe; Teller, Christian

    operation is highly automated. However, the procedures for estimating demands and the policies for the inventory control system that were in use at the beginning of the project did not fully match the sophisticated technological standard of the physical system. During the initial phase of the project...... We describe the development of a framework to compute the optimal inventory policy for a large spare-parts' distribution centre operation in the RA division of the Danfoss Group in Denmark. The RA division distributes spare parts worldwide for cooling and A/C systems. The warehouse logistics...

  18. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  19. Comparing private label and manufacturer brand innovation projects in a Dutch food processing company

    NARCIS (Netherlands)

    Omta, S.W.F.; Fortuin, F.T.J.M.

    2014-01-01

    The time when private labels consisted only of low-priced, low-quality products has long gone. A new type of cooperative innovation project has emerged in which food processors and retailers work closely together to target consumers with new and innovative products. These so-called high-end private

  20. Innovation in project-based companies - A case study in different approaches to organisational change

    DEFF Research Database (Denmark)

    Grex, Sara

    2004-01-01

    This paper asks how project-based organizations can be developed in order to establish and sustain innovation. The question is being explored by examining and comparing two approaches to organizational change. One approach emphasizes planning, regulation and control and creation of changes through...

  1. Project for the adaptation of the Instituto Nacional de Investigaciones Nucleares (ININ) to work as companies incubator, and the business plan as support device in the achievement of successful base technological companies

    International Nuclear Information System (INIS)

    Rubio A, C.R.

    1996-01-01

    The purpose of this project is to study an option to reduce technology dependence by taking advantage of the technology based companies generated by the organisms called 'Companies Incubators'. The first point given, is an introduction about incubation applied to national companies and the experiences had about them. There are also suggested some indicators which can be used to develop the incubator tasks. Once it has been defined the topic about incubation in the country, it is provided information about the items determining the company performance within an incubator. In order to do this, it is shown the way the Instituto Nacional de Investigaciones Nucleares can provide not only its facilities but also qualified personnel working for them. Thus it is given a scheme along with a brief organization description and key personnel for the incubator, stating the functions and responsibilities per each one of the persons who are part of the project direction and leading. The bases for the incubator are stated, as well as the requirements to start-up a company being supported by a company incubator. The key points to have a succesful development for the incubator are: the service it can give as well as the guidelines for companies entrance, which are classified into two sorts of customers, external and internal. It is also included a market research about the main product derived from creating a company incubator, as well as the sub-products, the market area, this is directed to the people who will benefit from it, the supply and demand involved with ININ. The main tool used was Business Plan, which defines its importance within the organization and activities guide, it is also included the Business Plan structure

  2. Installation modification of the reactor No.2 of Ikata nuclear power plant of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1980-01-01

    The application was made on August 25, 1979, from the president of the Shikoku Electric Power Company, Inc., to the Minister of International Trade and Industry, relating to the installation modification of the reactor No. 2 in the Ikata nuclear power plant. The inquiry was submitted on September 28, 1979, from the Minister of International Trade and Industry to the Nuclear Safety Commission, after the safety evaluation in the Ministry of International Trade and Industry, and the investigation and deliberation were started on October 1, 1979, in the Nuclear Safety Commission. The content of the modification is to add the circuit actuated by the abnormal low pressure signal of the reactor to the actuating circuit of the emergency core cooling system (ECCS) and to increase the new fuel storage capacity from about 1/3 core to about 2/3 core. The additional signal circuit is composed of the logic circuit of ''2 out of 4'' and is multichannel design. The circuit is independent from the reactor control system and the conventional signal circuit of the concurrence of low pressure in the reactor and low level in the pressurizer. With the addition of the circuit of abnormal low pressure signal of the reactor, the countermeasures for preventing ECCS start by mistake are also added. These modifications give no influence to the functions of the reactor control system and reactor protection system. The function and the performance of ECCS were analyzed and evaluated accompanying these modifications assuming the loss of coolant accident. Concerning the new fuel storage capacity, the type of racks is modified from angle type to can type, and the subcriticality is kept even at the time of water flood. (Nakai, Y.)

  3. Working conditions and psychosocial risk factors of employees in French electricity and gas company customer support departments.

    Science.gov (United States)

    Chevalier, Anne; Dessery, Michel; Boursier, Marie-Françoise; Grizon, Marie Catherine; Jayet, Christian; Reymond, Catherine; Thiebot, Michelle; Zeme-Ramirez, Monique; Calvez, Thierry

    2011-01-01

    Little is known about the real impact of working conditions on the health of call center employees. The aim of this article is to describe the working conditions of French electricity and gas company customer service teams, especially those spending more than 75% of their working time handling calls in order to determine their subjective experience of their work and identify situations at risk of psychosocial constraints. A cross-sectional study using a self-completion questionnaire was conducted on a representative sample of 2,000 employees working in customer service centers. The questions focused on the variety of tasks performed, the organization of working time, the physical environment of the workstation, violent situations and psychosocial factors (Job Content Questionnaire). Multivariate statistical analyses were performed to identify factors associated with the wish to leave the sector and with a high level of psychosocial constraints. Women made up 66% of the sample. Despite a high educational level, the average socio-professional level of the employees was relatively low. Although the vast majority of employees had chosen this career (74%), just over half would like to leave. The main factors associated with iso-strain were inadequate breaks (odds ratio (OR) = 2.0), low perceived quality of work (OR = 2.4), high proportion of working time spent handling calls (≥75% of working time: OR = 5.9, between 50 and Employees who spend more than 75% of their working time on the phone cumulate every factor linked with a high level of constraints, but all employees of the EDF and Gaz de France customer service centers are concerned. These workers share many characteristics with other call centers: predominantly female workforce; high educational level; wish to leave this sector despite the initial choice; high level of psychosocial risk factors.

  4. Situations of decontamination promotion activities. Efforts by Tokyo Electric Power Company, Fukushima Revitalization Headquarters, Decontamination Promotion Office

    International Nuclear Information System (INIS)

    Takano, Takahiko; Ito, Kei; Takizawa, Koichi

    2015-01-01

    As for the decontamination of the soil contaminated with radioactive materials, decontamination is on the way in compliance with the 'Act on Special Measures Concerning the Handling of Environmental Pollution by Radioactive Materials by the NPS Accident Associated with the Tohoku District - Off the Pacific Ocean' (hereinafter, the Act on Special Measures). Tokyo Electric Power Company (TEPCO), as the party concerned to the accident, is cooperating with decontamination activities conducted by countries and municipalities under the Act on Special Measures. Total number of people cooperated by the Decontamination Promotion Office amounts to about 120,000 people. The cooperation to the decontamination by countries and municipalities covers the following fields: provision of knowledge of radiation, training of site management and supervisors, and proposal such as the decontamination method suitable for the site. As cooperation to various monitoring, there is a traveling monitoring that performs radiation measurement from the vehicles. As cooperation in the farming and industrial resumption toward the reconstruction, the group has implemented support for the distribution promotion of the holdup that was stuck in distribution due to contamination with radioactive substances. As decontamination related technology, the following are performed: (1) preparation of radiation understanding promotion tool, (2) development of precise individual dose measurement technology, and (3) development and utilization of decontamination effect analysis program. In the future, this group will perform the follow-up for decontamination, and measures toward the lifting of evacuation order. It will install the basis to perform various technical analyses on decontamination, and will further intensify technical cooperation. (A.O.)

  5. Computational simulation and lean thinking as tools of process management: an assessment of different alternatives to increase capacity in a manufacturing company of aluminum electrical cables

    Directory of Open Access Journals (Sweden)

    Tiago Augusto Amarante de Souza

    2014-12-01

    Full Text Available In this study, the production chain of a manufacturing company of aluminum electrical conductors is analyzed, in order to select the best strategy for increasing its production capacity. The company´s production systems and flows are highly complex and have high variability in their production flows. A quantitative modeling methodology was proposed to simulate those systems, and to analyze them in a simpler manner. The simulation model considered two different strategies related to production increase: “Lean Thinking” and Machinery/Equipment Purchase. From the current context and the results obtained from the simulation study, it was possible to conclude that the best scenario for increasing production capacity for the company was using the Lean Thinking strategy on the critical processes.The gains in capacity are higher and the implementing costs involved are lower than the ones observed in the other strategy considered.

  6. Projected role of advanced computational aerodynamic methods at the Lockheed-Georgia company

    Science.gov (United States)

    Lores, M. E.

    1978-01-01

    Experience with advanced computational methods being used at the Lockheed-Georgia Company to aid in the evaluation and design of new and modified aircraft indicates that large and specialized computers will be needed to make advanced three-dimensional viscous aerodynamic computations practical. The Numerical Aerodynamic Simulation Facility should be used to provide a tool for designing better aerospace vehicles while at the same time reducing development costs by performing computations using Navier-Stokes equations solution algorithms and permitting less sophisticated but nevertheless complex calculations to be made efficiently. Configuration definition procedures and data output formats can probably best be defined in cooperation with industry, therefore, the computer should handle many remote terminals efficiently. The capability of transferring data to and from other computers needs to be provided. Because of the significant amount of input and output associated with 3-D viscous flow calculations and because of the exceedingly fast computation speed envisioned for the computer, special attention should be paid to providing rapid, diversified, and efficient input and output.

  7. Expanded spent fuel storage project at Yankee Atomic Electric Plant

    International Nuclear Information System (INIS)

    Chin, S.L.

    1980-01-01

    A detailed discussion on the project at the Yankee Rowe power reactor for expanding the capacity of the at-reactor storage pool by building double-tier storage racks. Various alternatives for providing additional capacity were examined by the operators. Away-from-reactor alternatives included shipment to existing privately owned facilities, a regional independent storage facility, and transshipments to other New England nuclear power plant pools. At-reactor alternatives evaluated included a new pool modification of the existing structure and finally, modification of the spent fuel pit. The establishment of a federal policy precluding transshipment of spent fuel prohibited the use of off-site alternatives. The addition of another pool was too expensive. The possibility of modifying an existing on-site structure required a new safety evaluation by the regulatory group with significant cost and time delays. Therefore, the final alternative - utilizing the existing spent fuel pool with some modification - was chosen due to cost, licensing possibility, no transport requirements, and the fact that the factors involved were mainly under the control of the operator. Modification of the pool was accomplished in phases. In the first phase, a dam was installed in the center of the pool (after the spent fuel was moved to one end). In the second phase, the empty end of the pool was drained and lined with stainless steel and the double-tier rack supports were added. In the third phase, the pool was refilled and the dam was removed. Then the spent fuel was moved into the completed end. In the fourth phase, the dam was replaced and the empty part of the pool was drained. The liner and double-tier rack supports were installed, the pool was refilled, and the dam was removed.The project demonstrated that the modification of existing spent fuel fuel pools for handling double-tier fuel racks is a viable solution for increasing the storage capacity at the reactor

  8. Evolution of the U.S. energy service company industry: Market size and project performance from 1990–2008

    International Nuclear Information System (INIS)

    Larsen, Peter H.; Goldman, Charles A.; Satchwell, Andrew

    2012-01-01

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a “top-down” approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a “bottom-up” analysis of a database of ∼3250 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of a severe economic recession, the U.S. ESCO industry managed to grow at about 7% per year between 2006 and 2008. ESCO industry revenues were about $4.1 billion in 2008 and ESCOs anticipate accelerated growth through 2011 (25% per year). We found that 2484 ESCO projects in our database generated ∼$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20% of all U.S. ESCO market activity from 1990–2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated ∼$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. There is empirical evidence confirming that the industry is evolving by installing more comprehensive and complex measures—including onsite generation and measures to address deferred maintenance—but this evolution has significant implications for customer project economics

  9. Help guide for setting up photovoltaic projects born by agricultural companies and farmers

    International Nuclear Information System (INIS)

    2010-01-01

    After a brief recall of energy production and consumption challenges in France, and a brief presentation of photovoltaic energy production connected to the distribution network in urban settings, this document describes the arrangements which aim at supporting this production by introducing purchase tariffs. Eligibility criteria and the different tariff levels are presented. They depend on the type of building and on the level of integration of the production module. Then, after having highlighted the reasons to invest in such projects, the document specify technical prerequisites (building orientation, roof slope angle, shadow effect plotting, module technologies, connection technical and economic feasibility), how to carry the project to a successful conclusion (internal communication, urban planning approaches, engineering consultancy, relationship with financiers, administrative aspects). It also comments the various aspects of the technical-economic analysis (photovoltaic system choice and installation, maintenance, insurance, connection to the network), the law and tax issues (roof renting, taxes), and the operation. Four examples are briefly presented

  10. The research of electrical tracing system construction management and related questions of BOP project

    International Nuclear Information System (INIS)

    Wang Lining; Li Jingmin; Ma Ding; Tu Haitao

    2015-01-01

    Based on Hongyanhe nuclear power plant in Liaoning province, the paper studies the anti-freeze and heat tracing work of BOP project. It compares several different heat tracing solutions in terms of technicality and applicability, and gave the most suitable scheme by using electrical tracing. It also presents the construction details of the electrical tracing system, analyzes the key points of the construction management from quantity, safety and schedule aspects, and gave the improvement suggestions. (authors)

  11. Cummins Engine Company B5.9 Propane Engine Development, Certification, and Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    The ADEPT Group, Inc. (Los Angeles, California)

    1998-12-18

    The objective of this project was to successfuly develop and certify an LPG-dedicated medium-duty original equipment manufacturer (OEM) engine that could be put into production. The engine was launched into production in 1994, and more than 800 B5.9G engines are now in service in the United States and abroad. This engine is now offered by more than 30 bus and truck OEMs.

  12. The Marketplace Variables in Successful and Unsuccessful NPD Projects in Technology Intensive Companies

    OpenAIRE

    Haverila, Matti

    2010-01-01

    We present an exploratory investigation of how managers conceptualize and perceive ‘marketplace’ variables in successful and unsuccessful New Product Development (NPD) projects, and explore the role that marketplace variables play in differentiating between successful and unsuccessful NPD outcomes. Limitations and future research directions are also discussed. Our findings indicate that managers perceive the marketplace in multiple ways during the NPD process and also that differences exis...

  13. 77 FR 28618 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Draft...

    Science.gov (United States)

    2012-05-15

    ...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Draft Environmental... & Electric (SDG&E) Ocotillo Sol Solar Project in Imperial County, California, and by this notice is... comments related to the SDG&E Ocotillo Sol Solar Project by any of the following methods: Web site: http...

  14. 76 FR 40905 - Turnagain Arm Tidal Electric Energy Project; Notice of Intent To File License Application, Filing...

    Science.gov (United States)

    2011-07-12

    ... Tidal Electric Energy Project; Notice of Intent To File License Application, Filing of Pre-Application....: 13509-001. c. Dated Filed: May 11, 2011. d. Submitted By: Turnagain Arm Tidal Energy Corporation. e. Name of Project: Turnagain Arm Tidal Electric Energy Project. f. Location: Of the Upper Cook Inlet off...

  15. Demands on project management of comprehensive modernization projects in the electrical systems area. Example of modernization of electrical systems of Kozloduy NPP Unit 5 and 6

    International Nuclear Information System (INIS)

    Stinshoff, Helmut; Weber, Patrick

    2006-01-01

    In nuclear power plants, station supply with electric energy must be guaranteed any time. This applies in particular also during the implementation of complex electrical systems modernization projects. Highest demands on the project management, extensive experience and system knowledge are required. In the frame of the Modernization Program for the nuclear power plant Kozloduy unit 5 and 6 in Bulgaria Framatome ANP has approved its ability to implement a large scope of modernization measures during the refueling outages of the years 2003 to 2005. The Contract of the Modernization Program for the European Consortium Kozloduy (Framatome ANP, Atomenergoexport) was signed in July 1999 and became effective in June 2001. The project will be finished by May 2006, with the approval of the Updated Final Safety Analysis Report. The scope of hardware work has been implemented within 6 plant outages during the years 2002 to 2005. The focus of the Modernization Program is mainly oriented to nuclear safety aspects, with the aim of upgrading of the Units to a high safety level in compliance with international practice. A further section of the project is dedicated to upgrading of operational equipment. Framatome ANP personnel have shown that besides the technical challenges which had to be faced, also the intercultural and language barriers were successfully overcome. The good teamwork between the partners of the Consortium ECK, its Bulgarian subcontractors and with Kozloduy plant personnel has been an important success factor. (authors)

  16. Idaho National Laboratory’s Analysis of ARRA-Funded Plug-in Electric Vehicle and Charging Infrastructure Projects: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, Jim [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Bennett, Brion [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Carlson, Richard [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Garretson, Thomas [Electric Applications Incorporated, Phoenix, AZ (United States); Gourley, LauraLee [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Karner, Donal [Electric Applications Incorporated, Phoenix, AZ (United States); McGuire, Patti [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Scoffield, Don [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Kirkpatrick, Mindy [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Shrik, Matthew [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Salisbury, Shawn [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Schey, Stephen [Electric Applications Incorporated, Phoenix, AZ (United States); Smart, John [Idaho National Laboratory (INL), Idaho Falls, ID (United States); White, Sera [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Wishard, Jeffery [Intertek Center for the Evaluation of Clean Energy Technology, Phoenix, AZ (United States)

    2015-09-01

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s (DOE) Idaho National Laboratory (INL), is the lead laboratory for U.S. Department of Energy’s Advanced Vehicle Testing Activity (AVTA). INL’s conduct of the AVTA resulted in a significant base of knowledge and experience in the area of testing light-duty vehicles that reduced transportation-related petroleum consumption. Due to this experience, INL was tasked by DOE to develop agreements with companies that were the recipients of The American Recovery and Reinvestment Act of 2009 (ARRA) grants, that would allow INL to collect raw data from light-duty vehicles and charging infrastructure. INL developed non-disclosure agreements (NDAs) with several companies and their partners that resulted in INL being able to receive raw data via server-to-server connections from the partner companies. This raw data allowed INL to independently conduct data quality checks, perform analysis, and report publicly to DOE, partners, and stakeholders, how drivers used both new vehicle technologies and the deployed charging infrastructure. The ultimate goal was not the deployment of vehicles and charging infrastructure, cut rather to create real-world laboratories of vehicles, charging infrastructure and drivers that would aid in the design of future electric drive transportation systems. The five projects that INL collected data from and their partners are: • ChargePoint America - Plug-in Electric Vehicle Charging Infrastructure Demonstration • Chrysler Ram PHEV Pickup - Vehicle Demonstration • General Motors Chevrolet Volt - Vehicle Demonstration • The EV Project - Plug-in Electric Vehicle Charging Infrastructure Demonstration • EPRI / Via Motors PHEVs – Vehicle Demonstration The document serves to benchmark the performance science involved the execution, analysis and reporting for the five above projects that provided lessons learned based on driver’s use of the

  17. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-04-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company...

  18. Electric power supply and demand 1978--1987 for the continuous United States as projected by the Regional Electric Reliability Councils in their April 1, 1978 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    1978-06-15

    The Regional Reliability Council projections of peak demand, generating capability, and electric energy requirements for the contiguous U.S. have declined for the fourth consecutive year. On the basis of these projections, it appears that the electric utility industry believes the U.S. will experience smaller annual increases in power use than have occurred in the past. The summer peak demand growth rates of the Councils range from 3.52 percent annually, as projected by the Northeast Power Coordinating Council, to the 6.21 percent projected by the Southwest Power Pool. Subregional growth covers a wider range, from the 2.77 percent of the New York Power Pool to the 6.51 percent of the Southern Company area. Total reserve margins at the time of summer peak demands are projected to decline from an estimated 30.16 percent in 1978 to about 23.81 percent in 1987. If projected loads are not exceeded, if projected capability levels are actually attained, if fuel requirements are satisfied, and if no contingencies worse than those normally met with are experienced, electric power supply should be adequate for the next decade. However, it is possible that the projected reserve margins will not be attained, and that adequate primary energy supply (fuel and hydro) will not be available when needed. Completion of generating units and transmission facilities on schedule is made uncertain by difficulties related to financing, environmental pressures, procedural delays and some inadequacies with respect to quality control of manufactured and field-assembled components.

  19. Technical and Economic Evaluation of «Electric House» Project: Investigation of Possibility to Use Electric Power as Single Energy Carrier in Residential Buildings

    OpenAIRE

    M. M. Oleshkevich; Y. V. Makosko

    2011-01-01

    The paper considers special features of the «Electric House» project where the building is provided with electric power, cold water and sewerage system. The «Electric House» is characterized by ecological cleanness, high reliability in power supply and low capital costs. While running the «Electric House» an annual expenditure of equivalent fuel is increased due to low efficiency of electric power generation at power plants. The profit obtained due to «Electric House» construction is depleted...

  20. Guanacaste Geothermal Project. Technical prefeasibility report. Annex C. Electric resistivity

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This report is the third of six annexes to the Summary Report on the First Phase of the Guanacaste Geothermal Project. The studies covered an area of 500 km/sup 2/ on the SW flanks of the Rincon de la Vieja and Miravalles volcanoes of the Guanacaste Volcanic Range in NW Costa Rica, and were aimed at locating zones of high geothermal gradient, and reconstruction of the stratigraphic column. The formations in the area under study can be grouped into six resistivity ranges, varying from less than 5 to more than 200 ohm-meters. Values from 200 to as high as 30,000 ohm-meters generally correspond to fractured and porous lavas, their fracturing and porosity, as well as their drainability, increasing with resistivity. The values above 100 ohm-meters were recorded in zones of recent lava flows, in spurs of the volcanoes Rincon de la Vieja and Santa Maria, and in the slopes of the Miravalles volcano, and correspond to shallow formations (maximum depths of 150 meters) which may constitute recharge zones for the underground aquifiers. The values in the 100 to 200 ohm-meter range were generally recorded directly under layers constituted by drained, porous lavas, or under shallow layers where no recent lavas are present. The third group comprises materials with resistivities in the 25 to 100 ohm-meter range, occurring at two different depth levels: a deep one (more than 1000 meters) and a shallow one (less than 400 meters). Resistivities less than 25 ohm-meters were recorded at depths of 250 meters and more, and may correspond to material typical of the Aguacate formation, which probably constitutes the reservoir rock of the geothermal fluids. In order to locate the zones of most geothermal interest, this range was classified into the three remaining of the six groups, viz 10 to 25, 5 to 10, and less than 5 ohm-meters, the last group appearing to be that of greatest geothermal potential.

  1. Esmeralda Energy Company, Final Scientific Technical Report, January 2008. Emigrant Slimhole Drilling Project, DOE GRED III

    Energy Technology Data Exchange (ETDEWEB)

    Deymonaz, John [Fish Lake Green Power Co. (United States); Hulen, Jeffrey B. [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geosciences Inst.; Nash, Gregory D. [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geosciences Inst.; Schriener, Alex [Earth Systems Southwest (United States)

    2008-01-22

    The Emigrant Slimhole Drilling Project (ESDP) was a highly successful, phased resource evaluation program designed to evaluate the commercial geothermal potential of the eastern margin of the northern Fish Lake Valley pull-apart basin in west-central Nevada. The program involved three phases: (1) Resource evaluation; (2) Drilling and resource characterization; and (3) Resource testing and assessment. Efforts included detailed geologic mapping; 3-D modeling; compilation of a GIS database; and production of a conceptual geologic model followed by the successful drilling of the 2,938 foot deep 17-31 slimhole (core hole), which encountered commercial geothermal temperatures (327⁰ F) and exhibits an increasing, conductive, temperature gradient to total depth; completion of a short injection test; and compilation of a detailed geologic core log and revised geologic cross-sections. Results of the project greatly increased the understanding of the geologic model controlling the Emigrant geothermal resource. Information gained from the 17-31 core hole revealed the existence of commercial temperatures beneath the area in the Silver Peak Core Complex which is composed of formations that exhibit excellent reservoir characteristics. Knowledge gained from the ESDP may lead to the development of a new commercial geothermal field in Nevada. Completion of the 17-31 core hole also demonstrated the cost-effectiveness of deep core drilling as an exploration tool and the unequaled value of core in understanding the geology, mineralogy, evolutional history and structural aspects of a geothermal resource.

  2. Economic Effectiveness Evaluation In Projects Consisting In Automating Settlement Systems. The Example Of A Financial Centre Of An Internationa l Automotive Company

    OpenAIRE

    Miroslaw Dyczkowski

    2010-01-01

    Economic effectiveness has become a decisive factor in feasibility studies for IT projects due to deteriorating economic situation. This paper characterises such an assessment on the example of an automated settlement system for a supply chain. The described project was carried out by a financial centre – located in Poland – of an in ternational company operating in the automotive industry. It aimed at applying EDI technologies to automate logistics. The project...

  3. STRATEGIC PURCHASING IN A PROJECT- BASED COMPANY – TO CENTRALIZE OR DECENTRALIZE

    Directory of Open Access Journals (Sweden)

    Eva Donociková

    2014-03-01

    Full Text Available Organizations all lie on a spectrum, at one end of which are firms with complete centralization of purchasing, and at the other end are firms with complete decentralization. Most firms lie somewhere between the two extremes, and we have already mentioned the most common model that has certain decisions centralized (perhaps strategy design, selection of suppliers, purchasing of major capital equipment, training, co-ordination, communications, etc. and bulk of purchasing devolved to local buyers. There are many variations on the type of activities that are either centralized or decentralized. In the last 12 years purchasing has noticed two radical changes in the majority of facilities. First change was the reverse of supplier – customer relationships where the role of purchasers changed from persuading and begging the suppliers to ever deliver, preferably with minimum delay (for fixed prices, to standard purchase activities where the purchaser can choose from many suppliers and negotiate prices with vendors to achieve the best conditions for his buyer. The second change was the establishing of a modern IT system that made purchasing activities more effective, more automatic and transparent to a considerable extent. It is good to realize whether all changes have led to improvement or whether these changes have caused a stop or a slowdown of the project purchasing – whether it is possible or even necessary to take into account global as well as local suppliers or to combine them. This Case Study demonstrates how a project - managed organization could look like, where it is necessary to take into account customer´s wishes and benefit.

  4. Electrometallurgy company Influence to the Electric Power System of Macedonia and their future participation in the conditions of an open electricity market in Macedonia and the Region

    International Nuclear Information System (INIS)

    Jarmov, Gjorgi; Popovski, Ljubin; Aleksoski, Borko

    2001-01-01

    In this paper the basic characteristics of the electric power consumption in the R. Macedonia for the 2000 year are given. The large electric power consumers are presented, as well as possibilities of their participation in the conditions of an open electricity market in Macedonia and the Region

  5. Descriptive Study of Occupational Accidents and their Causes among Electricity Distribution Company Workers at an Eight-year Period in Iran

    Science.gov (United States)

    Rahmani, Abdolrasoul; Khadem, Monireh; Madreseh, Elham; Aghaei, Habib-Allah; Raei, Mehdi; Karchani, Mohsen

    2013-01-01

    Background Occupational accidents are unplanned events that cause damage. The socio-economic impacts and human costs of accidents are tremendous around the world. Many fatalities happen every year in workplaces such as electricity distribution companies. Some electrical injuries are electrocution, electric shock, and burns. This study was conducted in an electricity distribution company (with rotational 12-hour shift work) in Iran during an 8-year period to survey descriptive factors of injuries. Methods Variables collected included accident time, age of injured worker, employment type, work experience, injury cause, educational background, and other information about accidents. Results Results indicated that most of the accidents occurred in summer, and 51.3% were during shift work. Worker negligence (malpractice) was the cause of 75% of deaths. Type of employment had a significant relationship with type of injuries (p safety was related to job experiences. Temporary workers have no chance to work all year like permanent workers, therefore impressive experiences may be less in them. Because the lack of protective equipment and negligence are main causes of accidents, periodical inspections in workshops are necessary. PMID:24106647

  6. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  7. 75 FR 43519 - Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No...

    Science.gov (United States)

    2010-07-26

    ... DEPARTMENT OF ENERGY Western Area Power Administration Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No. 5 Substation and the Palo Verde Hub AGENCY... Department of Energy (DOE), is requesting SOIs from entities that are interested in purchasing transmission...

  8. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  9. 75 FR 61414 - Basin Electric Power Cooperative: South Dakota PrairieWinds Project

    Science.gov (United States)

    2010-10-05

    ... renewable energy goals. The resources or environmental factors that could be affected by the proposed... purpose and need, Basin Electric identified construction of the proposed Project as its best course of... environmental factors (e.g., soils, topography and geology, water resources, air quality, biological resources...

  10. Miniaturized Power Processing Unit Study: A Cubesat Electric Propulsion Technology Enabler Project

    Science.gov (United States)

    Ghassemieh, Shakib M.

    2014-01-01

    This study evaluates High Voltage Power Processing Unit (PPU) technology and driving requirements necessary to enable the Microfluidic Electric Propulsion technology research and development by NASA and university partners. This study provides an overview of the state of the art PPU technology with recommendations for technology demonstration projects and missions for NASA to pursue.

  11. Choice of models and data availability for the efficiency analysis of the Dutch distribution and supply companies in the electricity sector. Background document of 'Guidelines for price cap regulation in the Dutch electricity sector'

    International Nuclear Information System (INIS)

    Burns, P.; Huggins, M.; Riechmann, C.; Weyman-Jones, T.

    2000-02-01

    July 1999 The Netherlands Electricity Regulatory Service (DtE) published an Information and Consultation Document on the title subject. By means of price cap regulation tariffs are determined such that businesses are stimulated continuously to organize their total processes and operation as efficient as possible. In the consultation document a large number of questions with respect to the future organization and planning of the system of economic regulation of the electricity sector in the Netherlands can be found. Many reactions and answers were received, compiled and analyzed. The results are presented in the main report, which forms the framework for the DtE to shape the economic regulation of the Dutch electricity sector. In this background document attention is paid to the most appropriate models by means of which the efficiency of the electricity companies in the Netherlands can be analyzed

  12. IT support of commercial-production companies

    International Nuclear Information System (INIS)

    Hroch, A.

    2004-01-01

    Slovak electricity sector was built from sixties like common entity what can use synergic effects. In the 2002 reorganisation was done, there were created independent joint stock company. There were published new legislative acts, which opened Slovak electricity market for competition. The companies have to change their mine because a business is priority No. 1. Slovenske elektrarne, joint-stock company is under transformation process to build procedural guided trade-production company. As joint project is prepared a new system to control business in to a trading floor, including a risk management, which have to be supported by technological and information tools together with planing, scheduling, directing and controlling of the operation. The all system includes standard modules that fulfil their specific functions. (author)

  13. Bill project for a new organisation of the electricity market (NOME): impact study

    International Nuclear Information System (INIS)

    2010-01-01

    This document reports a study of the impact of the implementation of regulated access to electricity, of a capacity obligation, and of the evolution of regulated selling prices. It outlines that the progressive opening to concurrence of electricity in European markets did not reach in France the expected objectives: to let consumers get the benefit of investment in nuclear energy, incentives for innovation and demand reduction, promotion of investments within the frame of the electricity European market, etc. The authors describe the electricity market new organisation which is defined in the bill project, and the expected impacts on the different actors, macro-economical impacts, impacts on public finance and employment, environmental impacts, social impacts, and legal impacts

  14. 78 FR 69847 - North Side Canal Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-11-21

    ... Canal Hydro Project would be located along North Side Canal Company's irrigation system on the U Canal... agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. FPA 30...

  15. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    International Nuclear Information System (INIS)

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  16. A combined hydro-nuclear-solar project for electric power production

    International Nuclear Information System (INIS)

    Yiftah, S.

    1985-01-01

    Some of the main, general-perspective themes of Dr. Alvin Weinberg's leadership and long and varied work are: the effect of present and future nuclear energy projects on society, not only in the United States but throughout the world; analysis, comparison, and combination of various sources of energy; extensive multiple use of nuclear energy complexes (so-called NUPLEX, for nuclear complex) for various areas of the world; and use of ''Big Technology'' and ''Big Science'' for solving, or helping to solve, political problems. A combined hydro-nuclear-solar project for electric power production is discussed, as well as two other energy-related engineering projects. Some of the projects originated or were inspired by work done at the Oak Ridge National Laboratory under the leadership of Dr. Alvin Weinberg. Also reported are the technical characteristics and interrelationships of the three components of the envisaged hydronuclear-solar project

  17. 75 FR 11151 - Pacific Gas and Electric Company; Notice of Intent To File License Application, Filing of Draft...

    Science.gov (United States)

    2010-03-10

    .... Name of Project: Humboldt WaveConnect Pilot Project. f. Location: The project would be located in the... Preservation Act; and recommending that it begin informal consultation with: (a) The U.S. Fish and Wildlife.... n. The proposed Humboldt WaveConnect Pilot Project would consist of: (1) Wave energy conversion (WEC...

  18. Can the BestGrid Process Improve Stakeholder Involvement in Electricity Transmission Projects?

    Directory of Open Access Journals (Sweden)

    Nadejda Komendantova

    2015-08-01

    Full Text Available The European Union has set ambitious targets for deployment of renewable energy sources to reach goals of climate change mitigation and energy security policies. However, the current state of electricity transmission infrastructure is a major bottleneck for further scaling up of renewable energy in the EU. Several thousands of kilometers of new lines have to be constructed and upgraded to accommodate growing volumes of intermittent renewable electricity. In many countries, construction of electricity transmission projects has been delayed for several years due to concerns of local stakeholders. The innovative BESTGRID approach, reported here, brings together transmission system operators (TSOs and non-governmental organizations (NGOs to discuss and understand the nature of stakeholder concerns. This paper has three objectives: (1 to understand stakeholder concerns about the deployment of electricity transmission grids in four pilot projects according to five guiding principles: need, transparency, engagement, environment, and impacts on human health as well as benefits; (2 to understand how these principles can be addressed to provide a basis for better decision-making outcomes; and (3 to evaluate the BESTGRID process based on feedback received from stakeholders and the level of participation achieved according to the ladder of Arnstein. This paper goes beyond a discussion of “measures to mitigate opposition” to understand how dialogue between TSOs and the public—represented mainly by NGOs and policy-makers—might lead to a better decision-making process and more sustainable electricity transmission infrastructure deployment.

  19. The French Electricity Company (EDF) and the environment. Press file for 1996; EDF et l'environnment 1996. Dossier de presse

    Energy Technology Data Exchange (ETDEWEB)

    Bourdier, Jean-Pierre [Electricite de France (EDF), 75 - Paris (France)

    1997-03-27

    In 1996 the actions of EDF in the domain of environment have recorded FF 4 billions (FF 3.5 billion in 1995), representing about 2% of the EDF's turnover. The EDF keeps on its efforts for reducing the impact of its activities upon environment. Several applications of an environment protective electricity generation are promoted by the company. The company brings services and technical solutions to its clients which meet their energy needs and conserving at the same time the life conditions. Furthermore, EDF participates in the activity of numerous national and international organisms, intervening in the environmental questions, in decision making, participating in studies and actions and following continually the direction of a durable economic and social development. The report is structured in three chapters: 1. an industrial responsibility; 2. services and techniques for environment; 3. action towards a durable development.

  20. The French Electricity Company (EDF) and the environment. Press file for 1996; EDF et l'environnment 1996. Dossier de presse

    Energy Technology Data Exchange (ETDEWEB)

    Bourdier, Jean-Pierre [Electricite de France (EDF), 75 - Paris (France)

    1997-03-27

    In 1996 the actions of EDF in the domain of environment have recorded FF 4 billions (FF 3.5 billion in 1995), representing about 2% of the EDF's turnover. The EDF keeps on its efforts for reducing the impact of its activities upon environment. Several applications of an environment protective electricity generation are promoted by the company. The company brings services and technical solutions to its clients which meet their energy needs and conserving at the same time the life conditions. Furthermore, EDF participates in the activity of numerous national and international organisms, intervening in the environmental questions, in decision making, participating in studies and actions and following continually the direction of a durable economic and social development. The report is structured in three chapters: 1. an industrial responsibility; 2. services and techniques for environment; 3. action towards a durable development.

  1. Foreign direct investment (FDI) in energy/electricity projects in the economies in transition

    International Nuclear Information System (INIS)

    Brendow, K.

    1995-01-01

    Registered foreign direct investments (FDI) in energy/ electricity projects in central and eastern Europe and the CIS are weak and disappointing compared with expectations and business opportunities. In addition, energy FDI is highly concentrated in oil and gas exploration/extraction. FDI opportunities in electricity generation, transmission and distribution while being explored, have not been implemented, mostly for legislation restriction reasons towards foreign participation. The major issue appears to be the extent of privatization of this politically and socially sensitive industry. Progress are made in Hungary, Poland and the Czech Republic. A significant breakthrough depends on political stability, economic recovery and progress in privatization. 2 figs

  2. Electrification Futures Study: End-Use Electric Technology Cost and Performance Projections through 2050

    Energy Technology Data Exchange (ETDEWEB)

    Jadun, Paige [National Renewable Energy Lab. (NREL), Golden, CO (United States); McMillan, Colin [National Renewable Energy Lab. (NREL), Golden, CO (United States); Steinberg, Daniel [National Renewable Energy Lab. (NREL), Golden, CO (United States); Muratori, Matteo [National Renewable Energy Lab. (NREL), Golden, CO (United States); Vimmerstedt, Laura [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-12-01

    This report is the first in a series of Electrification Futures Study (EFS) publications. The EFS is a multiyear research project to explore widespread electrification in the future energy system of the United States. More specifically, the EFS is designed to examine electric technology advancement and adoption for end uses in all major economic sectors as well as electricity consumption growth and load profiles, future power system infrastructure development and operations, and the economic and environmental implications of widespread electrification. Because of the expansive scope and the multiyear duration of the study, research findings and supporting data will be published as a series of reports, with each report released on its own timeframe.

  3. FINANCIAL STUDY OF AN INVESTMENT PROJECT IN ALGERIA: CREATION OF A COMPANY WITHIN THE FRAMEWORK OF THE NATIONAL FUNDSUPPORT FOR YOUTH EMPLOYMENT (FNSEJ)

    OpenAIRE

    Dr Lyes OUABDESSELAM

    2017-01-01

    This article proposes a financial study of a project to create a commercial enterprise through the scheme proposed by the National Agency for Youth Employment Support (ANSEJ). The company is a testing and analysis laboratory. In this study we have prepared a complete financial package and we have budgeted this project over the entire amortization period of the investment credit in accordance with the timetable set by the support system for young entrepreneurs to set up a business in Algeria. ...

  4. The Comparative Effectiveness of Variants of Construction of Electricity Export Projects

    Directory of Open Access Journals (Sweden)

    Anatoly Vladimirovich Lagerev

    2014-06-01

    Full Text Available The study describes a methodological approach that evaluates the comparative efficiency of construction of export-oriented power plants and transmission lines taking into account the development of power industry in the region and uncertainty (ambiguity of initial information. At the first stage the authors determine socio-economic effects of each project of construction of export-oriented power plants. With the help of optimization models they choose options that can guarantee the balanced and cost-effective development of the regional electric power system. Then using a simulation model the researchers assess commercial viability of previously selected projects. The article applies this approach for selecting the preferred option of electricity export from Eastern Siberia to China. This study shows that the project of CPP based on Kovykta natural gas with electricity transmission line to Chinese border (near Zabaikalsk is more preferable one in comparison with other projects (CPP based on Kansk-Achinsk coal in Krasnoyarsky krai; CPP based on coal in the Republic of Buryatia and Zabaikalsky krai (Olon-Shibirskaya CPP; New Kharanorskaya CPP; CPP based on Mugunsky coal in Irkutskaya oblast

  5. New maintenance strategy of Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant for effective ageing management and safe long-term operation

    International Nuclear Information System (INIS)

    Inagaki, Takeyuki; Yamashita, Norimichi

    2009-01-01

    Fukushima Dai-ichi Nuclear Power Plant is the oldest among three nuclear power plants owned and operated by Tokyo Electric Power Company, which consists of six boiling water reactor units. The commercial operation of Unit 1 was commenced in 1971 (37 years old) and Unit 6 in 1978 (29 years old). Currently ageing degradations of systems, structures and components are managed through maintenance programs, component replacement/refurbishment programs and long-term maintenance plans. The long-term maintenance plans are established through ageing management component replacement/refurbishment programs reviews performed before the 30th year of operation and they are for safe and reliable operation after 30 years (long-term operation). However the past maintenance actions and past component replacement/refurbishment programs were not always proactive and past operational experience and maintenance practices suggest that effective/proactive ageing management programs be introduced in earlier stage of the plant operation. In this circumstance, Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant are setting up a new maintenance strategy that includes 1) improving the normal maintenance programs by using ageing degradation data, 2) effective use of information on internal/external operational experience and maintenance practices related to ageing, and 3) proactive component/equipment refurbishment programs during a refreshment outage for safe and reliable long-term operation. To accomplish the goal of this strategy, strengthening engineering capability of plant staff members is a crucial required for the plant. The objective of this paper is to briefly explain main results ageing management reviews, past and current significant ageing issues and management programs against them, and the new maintenance strategy established by Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant. (author)

  6. 75 FR 43099 - Airworthiness Directives; General Electric Company (GE) CT7-9C and -9C3 Turboprop Engines

    Science.gov (United States)

    2010-07-23

    ... balance-cuts can negatively affect the low-cycle fatigue life capability of the shaft. This condition, if... Company (GE) CT7-9C and -9C3 Turboprop Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION... nonconforming GGT shaft land balance-cuts, which could result in the shaft failing before its published life...

  7. Approach undertaken by our Company for leveling electric loads; Chubu Denryoku Kabushi Kaisha no fuka heijunka eno torikumi ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Measures for leveling the electric loads relying upon two facets - tariff system and business activities - in Chubu Electric Power Co., Inc. are presented. Firstly, the existing pricing systems for midnight electric power and electric light according to the period of time for the household as well as those of seasonal and time zone electric power, modifiable contract with the time zone and so forth for large industry users, together with a similar contract for the owner of regenerating installation are outlined. In addition, a price reduction system is indicated in favor of a scheduled shutdown of large industry operations as a means of avoiding electric consumption during weekdays in summer and between 13h and 16h when large demands exist. Further, a selective contract system put in service in 1995 and the price reduction for ice regenerating air conditioning system are cited. As for business facet, 1995 is regarded as the first year of the ice regenerator for its generalization through exhibition and promotive campaign to the foods processing industry, and the application of the latent heat regenerative system to perishable foods is recommended. Moreover, installation of energy saving type automatic vending machine, so-called eco-vendor is encouraged for its merit of peak-cut and energy price lowering. Lastly, activities to extend the use of electric calorifiers and the regenerative floor heating are mentioned. 2 figs., 1 tab.

  8. Project W-320, 241-C-106 sluicing electrical calculations, Volume 2

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system

  9. Auditor´s report of report of companies of the brazilian electrical sector: one study of the normative adherence of the reports emited between 1999 and 2006

    Directory of Open Access Journals (Sweden)

    Marcelo Haendchen Dutra

    2008-07-01

    Full Text Available The purpose of the present study was to verify the adherence to the normative demands found in the auditors’ reports concerned with the companies of the Brazilian electrical sector. To reach the proposed goal, an exploratory-descriptive study of report samples published between 1999 and 2006 was undertaken, covering the financial statements issued from 1998 to 2005, selected from Closing Balance, of Gazeta Mercantil. The research has an descriptive character and used the content analysis technique for the data analysis and interpretation. The approach adopted was both qualitative and quantitative. 136 auditors’ reports were scrutinized through the comparison between paragraphs contained in those reports and the aforementioned auditing standards issued by the regulating organ, the Accounting Federal Board. 936 frequencies were acknowledged, being divided into adherent and non-adherent, and the 14,9% of non-adherent ones were minutely discussed. Key words: Auditors’ Report, Auditing Standards and Electrical Sector.

  10. We let the electricity giants shrink. Anti-nuclear activists can be successful even against the largest companies; Wir lassen die Stromriesen schrumpfen. AtomkraftgegnerInnen koennen sogar gegen die groessten Konzerne erfolgreich sein

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-12-15

    In the newsletter the authors discuss the issues economic situation of the large electricity companies in Germany, the governmental energy policy, the ongoing financial support by the government, and the possibility to shutdown all German nuclear power plants without electricity shortcomings.

  11. Assessing Market Development and Innovation Project Management Factors Using the PICEA-g Hybrid Evolutionary Multi-Criteria Decision Technique. The Calcimine Company Case Study

    Directory of Open Access Journals (Sweden)

    S. Ghaffari

    2017-12-01

    Full Text Available Project management includes the consideration of complex decision modes used in modern decision support techniques. The aim of this paper was to prioritize such factors and evaluate their effects on project management and optimal control. Their effect on management and optimal project control are evaluated in frame of a statistical hypothesis. A new algorithm, "IPICEA-g" is proposed for the assessment. A questionnaire is used for data collection distributed between 56 employees of the CALCIMINE Company. T-test, two-sentence test, ANP method, FUZZY SEAMATEL and the IPICEA-g hybrid algorithm, are employed for data analyzing. Results are further discussed and conclusions are drawn.

  12. Modification of reactor installation in the Takahama nuclear power plants No.1 and No.2 of Kansai Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 24, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Takahama nuclear power plants No. 1 and No. 2 of the Kansai Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kansai Electric Power Company, Inc., to the Minister of International Trade and Industry on July 23, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit for transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  13. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Science.gov (United States)

    2013-07-26

    ...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...) Ocotillo Sol Solar Project in Imperial County, California, and by this notice is announcing its... Ocotillo Sol Solar Project Final EIS/Proposed CDCA Plan Amendment have been sent to affected Federal, State...

  14. Impact of Role Clarity and Strategic Fit on Average Project Success: Moderating Role of Market Turbulence on Telecom Companies of Pakistan

    Directory of Open Access Journals (Sweden)

    Najam UL MABOOD

    2017-06-01

    Full Text Available Advancement in technology has reshaped the businesses across the globe forcing companies to perform tasks and activities in the form of projects. Stakeholder behavior, stakeholder management, strategic fit, role and task clarity are some of the factors that redesign the project success. The current study examine the impact of strategic fit and role clarity on the Average project success and further it enlightens the moderating role of Market turbulence on the relationship between the aforementioned independent and dependent variables. The population of the study comprises of telecom sector of Pakistan. The Data was collected from 201 project team members working on diverse project in Telecom companies of Rawalpindi and Islamabad. The Data was gathered through a questionnaires measured on Likert scale adopted from the study of Beringer, Jonas & Kock (2013. Each Questionnaire comprises of 3 items to measure each variable. SPSS 20.0 Version was used to analyze the data by applying Pearson correlation and multiple regression analysis technique. Findings depicted that role clarity and strategic fit contributed significantly in enhancing success of a project. Results further evidenced that market turbulence negatively moderated the relationship of independent variables on Average project success. The study at the end highlights recommendations for the future researchers.

  15. 76 FR 56425 - Union Electric Company, dba Ameren Missouri; Notice of Application for Amendment of License and...

    Science.gov (United States)

    2011-09-13

    ... proposed non-project use would be located at the Ozark Yacht Club marina which is located at mile marker 0... for the Osage Hydroelectric Project, requests Commission authorization to permit the Ozark Yacht Club... patrons of the Ozark Yacht Club. No dredging activities, shoreline stabilization, or fueling facilities...

  16. Baseline recommendations for greenhouse gas mitigation projects in the electric power sector

    Energy Technology Data Exchange (ETDEWEB)

    Kartha, Sivan; Lazarus, Michael [Stockholm Environment Institute/Tellus Institute, Boston, MA (United States); Bosi, Martina [International Energy Agency, Paris, 75 (France)

    2004-03-01

    The success of the Clean Development Mechanism (CDM) and other credit-based emission trading regimes depends on effective methodologies for quantifying a project's emissions reductions. The key methodological challenge lies in estimating project's counterfactual emission baseline, through balancing the need for accuracy, transparency, and practicality. Baseline standardisation (e.g. methodology, parameters and/or emission rate) can be a means to achieve these goals. This paper compares specific options for developing standardised baselines for the electricity sector - a natural starting point for baseline standardisation given the magnitude of the emissions reductions opportunities. The authors review fundamental assumptions that baseline studies have made with respect to estimating the generation sources avoided by CDM or other emission-reducing projects. Typically, studies have assumed that such projects affect either the operation of existing power plants (the operating margin) or the construction of new generation facilities (the build margin). The authors show that both effects are important to consider and thus recommend a combined margin approach for most projects, based on grid-specific data. They propose a three-category framework, according to projects' relative scale and environmental risk. (Author)

  17. Inquiry relating to modifications of reactor installation in Ikata No. 1 and 2 nuclear power plants of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Ikata No. 1 and 2 nuclear power plants of the Shikoku Electric Power Company, Inc., on February 13, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the Atomic Energy Safety Commission (AESC) on June 15, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for No. 1 plant and the modification of driving mechanism from the roller nut type to the magnetic jack type for the control rod cluster for adjusting power distribution in the No. 2 plant. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. Relating to the driving mechanism for the control rod cluster adjusting power distribution, the driving speed is not modified and the reliability is kept by carrying out the continuous operation test and the electric power black out test as the demonstration test. The magnetic jack type mechanism has the locking device to prevent reactor tripping at the time of electric power black out, and the cluster is held at the location where the cluster existed at the time of black out. (Nakai, Y.)

  18. Users of electric heating rewarded

    Energy Technology Data Exchange (ETDEWEB)

    Haapakoski, M. [ed.

    1998-07-01

    When the building industry plunged into the deep recession of the early 1990s this did not paralyse research and development work on electric heating. In fact, IVO and power companies launched the `Electrically Heated Homes in the New Millennium` project in 1992. Its purpose was to verify the efficiency, energy economy and residential comfort of model systems using state-of-the-art electric heating technology. The research project launched six years ago is now nearing completion. Its findings indicate that electricity brings ever more unparalleled benefits when it is used for heating. These benefits involve residential comfort, ease of use and economy

  19. Renewable electricity market developments in the European Union. Final Report of the ADMIRE REBUS project

    International Nuclear Information System (INIS)

    Uyterlinde, M.A.; Daniels, B.W.; De Noord, M.; De Vries, H.J.; De Zoeten - Dartenset, C.; Skytte, K.; Meibom, P.; Lescot, D.; Hoffmann, T.; Stronzik, M.; Gual, M.; Del Rio, P.; Hernandez, F.

    2003-10-01

    Which countries offer the best markets for renewables? Are present support policies sufficient to meet the EU (European Union) renewables target for 2010? Which renewable technologies will have the largest growth in the present decade? The ADMIRE REBUS project has addressed these questions by giving an outlook on the future of electricity from renewable energy sources. The ADMIRE REBUS project team has analysed the market barriers, support policies and potentials for renewable electricity production in Europe. For these analyses a new tool was developed that simulates the development of the European renewable electricity market under different policy scenarios. The report starts with describing the approach and key assumptions used in the analysis. Next, an overview is provided of EU legislation and different support policies for renewable energy. After a brief overview of the different challenges that an investor faces when investing in renewable energy technologies with respect to lead times, risks and transaction costs, several policy scenarios for the future are discussed. Next, the report presents ADMIRE REBUS model analyses of different policy strategies for meeting the targets stated in the EU Renewables Directive. The report continues the analysis of model results with presenting prospects for individual technologies and market prices under different scenarios. Next, case studies are presented for four different EU Member States. The analysis results are put into perspective by a sensitivity analysis. Finally, conclusions are drawn and recommendations are formulated based on the above

  20. Beyond the line: exploring the HRM responsibilities of line managers, project managers and the HRM department in four project-oriented companies in the Netherlands, Austria, the UK and the USA

    NARCIS (Netherlands)

    Keegan, A.; Huemann, M.; Turner, J.R.

    2012-01-01

    The topic of what human resource management (HRM) responsibilities are devolved from the HRM department to line managers has attracted much interest in recent years. We report findings from a study on the devolution of HRM practices in four project-oriented companies (POCs) and argue that although

  1. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2. Docket Nos. 50-387 and 50-388, Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc

    International Nuclear Information System (INIS)

    1982-11-01

    In April 1981, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0776) regarding the application of the Pennsylvania Power and Light Company (the licensee) and the Allegheny Electric Cooperative, Inc. (co-licensee) for licenses to operate the Susquehanna Steam Electric Station, Units 1 and 2, located on a site in Luzerne County, Pennsylvania. Supplement 1, issued in June 1981, addressed outstanding issues. Supplement 2, issued in September 1981, contains the ACRS Report and responses. Supplement 3, issued in July 1982, contains the resolution to five items previously identified as open and closes them out. On July 17, 1982, License NPF-14 was issued to allow Unit 1 operation at power levels not to exceed 5% of rated power. This supplement discusses the resolution of several license conditions that have been met

  2. 76 FR 76155 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... Diego Gas & Electric Company transmission line located to the south. Applicant Contact: Arnold B...

  3. Results of photovoltaic power generation system operation in Tokyo Electric Power Company; Tokyo Denryoku ni okeru taiyoko hatsuden setsubi no unten jisseki ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Fukuda, H; Itokawa, K [Tokyo Electric Power Co. Inc., Tokyo (Japan)

    1996-10-27

    A report was made on the measurement of data and the results of the analysis at 14 sites of photovoltaic power generation facilities operated under system interconnection by Tokyo Electric Power Company. This type of system is provided in 40 sites as of the end of fiscal 1995, generating 479kw. The items measured were the generated electric energy at all 14 sites, and the quantity of solar radiation, outside air temperature, panel temperature, etc., at limited sites; and the capacity of each equipment, azimuth and inclination of the panel were also recorded simultaneously. Hourly values were used for the analysis. Five minute values were utilized, however, in the examination of the cause of lowered output and in the situation recognition of the influence of the shade or the change of weather. The utilization factor of the facilities was in the average 10.8% in fiscal 1994 and 10.7% in fiscal 1995. The factor decreased slightly unless the panel azimuth faced due south. The utilization factor at the panel inclination of 35 degrees and 45 degrees showed both 10.4% through the year making no difference. The system seemed to show no overwhelming possibilities in coping with electric power demand. The reason was that deviation existed for 2 hours or so in the peak and that reliability was low as basic power facilities. However, it was determined that the system be continuously examined in future. 9 figs., 1 tab.

  4. The Analysis of the Reaction of the Romanian Companies Supplying Electrical Energy to the Modification of the Geopolitical Context and of the Internal Legislative Frame

    Directory of Open Access Journals (Sweden)

    Vasile Robu

    2007-12-01

    Full Text Available Supplying services in the electrical energy domain that corresponds qualitatively, at acceptable prices, in the context of the respect of the environment preservation standards and of the security of the supply, in accordance with the demands of the economic growth, represents a main component of the lasting development. In the 9th chapter of the 21st Agenda is stated that “energy is essential to the economic and social development and to a better quality of life”. At global level, given the current technological conditions and the permanent growth of the quantity of resources used, a large part of the energy is produced and consumed in an unsustainable manner. The necessity of controlling the greenhouse gas emissions and of other polluting substances imposes the increase of the efficiency of production, transportation, distribution and consumption of the energy and the growth of the use of renewable energy sources. All energy sources must be used in a manner that permits the respect of the environment on the whole. The operational research executed let us state that the defining elements of the geopolitical context influence the behaviour of the companies supplying electrical energy, which has an effect in any branch of the national economy. Such an approach is useful in the determination of the impact of the increase of electrical energy prices on the vulnerable sectors of the national economy.

  5. Uses Of Innovative Project Management Tools In The Establishment Of E-Centers Solar PV System Installation Project Without Electricity In Bangladesh A Case Study On Ingen Technology Limited.

    Directory of Open Access Journals (Sweden)

    Md. Mohiuddin

    2017-02-01

    Full Text Available Todays world is shaped by availability of Information and Communication Technology ICT. Government of Bangladesh declared a vision of Digital Bangladesh by 2021 to ensure services at peoples doorsteps. A total number of 4501 UISCs Union Information and Service Centers have been established at all Union Parishads of Bangladesh. UISCs are the e-Service delivery outlets which initiated a new era in information and service delivery for rural and marginalized people. With the aim to ensure services at citizens doorsteps UISCs are offering various government services like public examination results online university admission birth-death registration agricultural amp law consultancy telemedicine life insurance private services like mobile banking English learning computer training email internet browsing and so on. Now-a-days UISC is a local knowledge Centre. But there is no electricity in each Union Parishad of Bangladesh. in that case for establishment of e-Centre in Seven Divisions of Bangladesh at Unions without Electricity project needed to provide electricity in everywhere. Without Electricity we cant imagine it. Thats why Bangladesh Government decided to install the Solar PV system in different unions of Bangladesh division wise. This research aims to focus on the implementation of project management concepts in Establishment of e-Centre in Seven Divisions of Bangladesh at Unions without Electricity under Bangladesh Computer Council BCC. Around 1000 unions e-Centre has been brought under solar power which is total 1800 KW for Rural infrastructure development under digital Bangladesh program. The purpose of the study is to identify and explore the processes of the InGen Technology Limited to show how the company accomplishes a Successful Project by formulating it through project management tools. The study investigates measures and evaluates the total processes or activities of InGen Technology Limited in accomplishing and delivering successful

  6. Economic feasibility study of an electric generation project from bagasse gasification in a cuban sugar mill

    International Nuclear Information System (INIS)

    Torres Fernández, Alfredo; Almazán del Olmo, Oscar; Hernández, Bárbara

    2015-01-01

    Some solid fuels which are very pollutant and with low value could be transformed into a clean gas that could be used in many industrial applications for its physical properties and for being easy transported. Then, electricity generation is one of the most important applications. In this case, electricity could be generated, cleanly and efficiently, through the use of synthesis gas that replaces the natural gas in a combined cycle (Biomass Integrated Gasification Combined Cycle (BIGCC)).In this paper, we carry out an economic feasibility study of the project about the implementation of Biomass Integrated Gasification Combined Cycle (BIGCC) in a 10000 tc/d sugar mill from bagasse gasification in order to demonstrate, from the economic point of view, the possibility of investment in this kind of technology considering the current conditions of Cuban sugar industry.Later, a sensitivity analysis is presented to show first, the break-even point associated to the project and second, the variations of financial indicators due to changes on the total amount of investments, which is a very helpful element for making right decisions in the project investment process. (author)

  7. Lessons Learned about Plug-in Electric Vehicle Charging Infrastructure from The EV Project and ChargePoint America

    Energy Technology Data Exchange (ETDEWEB)

    Smart, John Galloway [Idaho National Lab. (INL), Idaho Falls, ID (United States); Salisbury, Shawn Douglas [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-07-01

    This report summarizes key findings in two national plug-in electric vehicle charging infrastructure demonstrations: The EV Project and ChargePoint America. It will be published to the INL/AVTA website for the general public.

  8. Overview of US heavy-ion fusion commercial electric power systems assessment project. Revision

    International Nuclear Information System (INIS)

    Dudziak, D.J.; Pendergrass, J.H.; Saylor, W.W.

    1986-01-01

    The US heavy-ion fusion (HIF) research program is oriented toward development of multiple-beam induction linacs. Over the last two years an assessment has been performed of the potential of HIF as a competitive commercial electric power source. This assessment involved several technology performance and cost issues (e.g., final beam transport system, target manufacturing, beam stability in reactor cavity environments, and reactor cavity clearing), as well as overall power plant systems integration and tradeoff studies. Results from parametric analyses using a systems code developed in the project show cost of electricity (COE) values comparable with COEs from other magnetic fusion and inertial confinement fusion (ICF) plant studies; viz, 50-60 mills/kWh (1985 dollars) for 1-GWe plants. Also, significant COE insensitivity to major accelerator, target, and reactor parameters was demonstrated

  9. Development of superconducting wire and cable for the SSC project in Sumitomo Electric Industries

    International Nuclear Information System (INIS)

    Sashida, T.; Saito, S.; Oku, G.; Kurimoto, K.; Yamada, Y.; Yokota, M.; Ohmatsu, K.; Nagata, M.

    1991-01-01

    As a large production volume of NbTi superconducting wire and cable is required for the SSC project, a production process has been developed at Sumitomo Electric to optimize critical variables of wire properties. To achieve high electrical properties and a high overall yield of NbTi alloy in the fabrication process, the authors have employed carefully designed large size multifilament billets weighing more than 350kg to decrease the number of billets in large production scale. The collider dipole magnet consists of inner and outer cables, and the cable should be as uniform as possible to ensure the performance of the magnets. The authors studied two aspects to obtain such uniformity of superconducting wire; one is the selection of unit weight and the other is the property of critical current density of a strand

  10. Foreign direct investments (FDI) in energy and electricity projects in the economies in transition

    International Nuclear Information System (INIS)

    Brendow, K.

    1996-01-01

    Registered foreign direct investments (or equity finance) in energy and electricity projects in central and eastern Europe (CEE) and the Commonwealth of Independent States (CIS) presently stand at about US$ 3 billion (flows) and US$ 5.5 billion (stock). This is insignificant compared with world FDI and disappointing compared with expectations and business opportunities. In addition, energy FDI is concentrated in oil and gas exploration/extraction, primarily in Russia, Kazakhstan and Azerbaijan. FDI opportunities in electricity generation, transmission and distribution while being explored (see list), have not been implemented: legislation was either restrictive as regards foreign participation, or not yet finalized, or not yet enacted. The major issue at present appears to be the extent of privatisation of this politically and socially sensitive industry. 1995 will see progress in Hungary, Poland and the Czech Republic. Related FDI would, however, still be modest. A significant breakthrough depends on political stability, economic recovery and progress in privatisation. (author)

  11. Nuclear electric propulsion: An integral part of NASA's nuclear propulsion project

    International Nuclear Information System (INIS)

    Stone, J.R.

    1992-01-01

    NASA has initiated a technology program to establish the readiness of nuclear propulsion technology for the Space Exploration Initiative (SEI). This program was initiated with a very modest effort identified with nuclear thermal propulsion (NTP); however, nuclear electric propulsion (NEP) is also an integral part of this program and builds upon NASA's Base Research and Technology Program in power and electric propulsion as well as the SP-100 space nuclear power program. Although the Synthesis Group On America's SEI has identified NEP only as an option for cargo missions, recent studies conducted by NASA-Lewis show that NEP offers the potential for early manned Mars missions as well. Lower power NEP is also of current interest for outer planetary robotic missions. Current plans are reviewed for the overall nuclear propulsion project, with emphasis on NEP and those elements of NTP program which have synergism with NEP

  12. Electrification Futures Study: End-Use Electric Technology Cost and Performance Projections through 2050

    Energy Technology Data Exchange (ETDEWEB)

    Vimmerstedt, Laura J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jadun, Paige [National Renewable Energy Lab. (NREL), Golden, CO (United States); McMillan, Colin A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Steinberg, Daniel C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Muratori, Matteo [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu T. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-02

    This report provides projected cost and performance assumptions for electric technologies considered in the Electrification Futures Study, a detailed and comprehensive analysis of the effects of widespread electrification of end-use service demands in all major economic sectors - transportation, residential and commercial buildings, and industry - for the contiguous United States through 2050. Using extensive literature searches and expert assessment, the authors identify slow, moderate, and rapid technology advancement sensitivities on technology cost and performance, and they offer a comparative analysis of levelized cost metrics as a reference indicator of total costs. The identification and characterization of these end-use service demand technologies is fundamental to the Electrification Futures Study. This report, the larger Electrification Futures Study, and the associated data and methodologies may be useful to planners and analysts in evaluating the potential role of electrification in an uncertain future. The report could be broadly applicable for other analysts and researchers who wish to assess electrification and electric technologies.

  13. Results from the OECD report on international projections of electricity generating costs

    International Nuclear Information System (INIS)

    Paffenbarger, J.A.; Bertel, E.

    1998-01-01

    The International Energy Agency and Nuclear Energy Agency of the OECD have periodically undertaken a joint study on electricity generating costs in OECD Member countries and selected non-Member countries. This paper presents key results from the 1998 update of this study. Experts from 19 countries drawn from electric utility companies and government provided data on capital costs, operating and maintenance costs, and fuel costs from which levelized electricity generating costs (US cents/kWh) for baseload power plants were estimated in each country using a common set of economic assumptions. Light water nuclear power plants, pulverized coal plants, and natural gas-fired combined cycle gas turbines were the principal options evaluated. five and 10% discount rates, 40-year operating lifetime, and 75% annual load factor were the base assumptions, with sensitivity analyses on operating lifetime and load factor. Fuel costs and fuel escalation were provided individually by country, with a sensitivity case to evaluate costs assuming no real fuel price escalation over plant lifetimes. Of the three principal fuel/technology options, none is predominantly the cheapest option for all economic assumptions. However, fossil-fueled options are generally estimated to be the least expensive option. The study confirms that gas-fired combined cycles have improved their economic performance in most countries in recent years and are strong competitors to nuclear and coal-fired plants. Eleven out of the 18 countries with two or more options show gas-fired plants to be the cheapest option at 10% discount rate. Coal remains a strong competitor to gas when lower discount rates are used. Nuclear is the least expensive at both 5 and 10% discount rate in only two countries. Generally, with gas prices above 5 US$/GJ, nuclear plants constructed at overnight capital costs below 1 650 $/kWe have the potential to be competitive only at lower discount rates

  14. Energy, electricity and nuclear power: Developments and projections - 25 years past and future

    International Nuclear Information System (INIS)

    2007-12-01

    This report is based on the annual IAEA publication, Energy, Electricity and Nuclear Power Estimates for the Period up to 2030, Reference Data Series No. 1 (RDS-1). The IAEA has been publishing RDS-1 since 1981. It reports on the current status and estimates of energy use, electricity generation and nuclear power generation in various regions of the world for the medium to long term. The estimates are prepared in close collaboration and consultation with several international, regional and national organizations dealing with energy related statistics, such as the United Nations Department of Economic Affairs, the International Energy Agency (IEA), the OECD Nuclear Energy Agency (OECD/NEA), the World Bank, the World Nuclear Agency (WNA), the US Department of Energy (DOE) and the French Atomic Energy Commission (CEA), as well as several international energy experts. The latest issue is the 27th edition, reporting estimates for the next 24 years using 2006 as the base year. During its 26 years of regular publication, several adjustments were made to the definitions and methodology for compiling the energy data, in order to improve the quality of the data. These adjustments were in line with the overall efforts at the international level to harmonize energy statistics. For example, the United Nations Statistical Commission has been making efforts to synchronize its data series under various programmes. For RDS-1, one such adjustment was made in 2005 when the average thermal efficiency method was adopted to convert electricity produced by nuclear power plants from kilowatt-hours to joules. This had a significant impact on the values of total energy use. At this stage, the entire historical data series was also adjusted. This report provides these harmonized data series on energy use, electricity generation and nuclear power generation for the 25 year period (1980-2005). The report also compares the nuclear power projections made in the past with the projections made in

  15. Electric Motorboat Drag Racing: A Hands-On Physics Project that Motivates Students from Start to Finish

    Science.gov (United States)

    Barry, Reno

    2008-01-01

    Electric Motorboat Drag Racing is a culminating high school physics project designed to apply and bring to life many content standards for physics. Students need to be given several weeks at home to design and build their model-sized electric motorboats for the 5-meter drag racing competition down rain gutters. In the process, they are discussing…

  16. The Philip Morris Genome Project: a guide to tracking alliances of the world´s largest cigarette company

    Directory of Open Access Journals (Sweden)

    Alan Blum

    2018-03-01

    Full Text Available Background Beginning in the 1980s, tobacco control efforts shifted from school-based and clinic-based education about the dangers of smoking to direct confrontation of the tobacco industry. But the industry also evolved by developing innovative promotional campaigns, adopting new corporate identities, and forging alliances with other industries and charitable organizations. Methods To document the extent of the commercial, civic, political, academic, military,and cultural ties cultivated by the world´s largest cigarette manufacturer, Philip Morris, a continuous, 35-year ethnographic analysis was conducted, involving daily monitoring of the global business press; monthly review of tobacco industry trade publications; scrutiny of annual company reports; and attendance at 20 shareholders´ meetings, four international tobacco industry trade expositions, and over 200 sports, arts, and ethnic minority events sponsored by the company. Results 48 Philip Morris manufacturing facilities in 32 countries produce more than 800 billion cigarettes a year for 180 markets..A pioneer in sponsoring popular programs on the new medium of television in the 1950s; the company circumvented the 1971 ban on TV cigarette advertising by creating sporting events that were internationally televised. By acquiring beer and food companies In the 1980s, Philip Morris retained influence over the mass media covetous of advertising revenue. In 2002 the company changed its name to Altria to diminish the tobacco stigma. It makes the world´s top cigarette brand, Marlboro, and holds 28% of the global market excluding China. The company has forged an extensive network of alliances with agricultural, marketing, chemical, pharmaceutical, financial, packaging, entertainment, shipping, and technology companies, as well as ties to hundreds of museums, arts organizations, universities, libraries, and charities combating problems such as domestic violence, hunger, pollution, illiteracy, and

  17. Measurement of magnetic and electric field inhomogenities in a time projection chamber using laser tracks

    International Nuclear Information System (INIS)

    Benetta, M.; Froberger, J.P.; Lehraus, I.; Mathewson, R.; May, J.; Price, M.; Schlater, D.; Tejessi, W.; Witzeling, W.

    1985-01-01

    The large time projection chambers (TPC) for particle track measurements have their electric drift field parallel to the magnetic field which is needed for the momentum measurement of the particles. Small field inhomogeneities of the order of epsilon times the main field cause large track distortions (coordinate displacements) of the order of epsilon times the driftlength. It is therefore important for every TPC to know the inhomogeneities very well. Laser rays have proven to be useful to study them. We report here on our experience with a TPC having a maximum drift length of 1.3 m

  18. Analysis of electrical circuits with variable load regime parameters projective geometry method

    CERN Document Server

    Penin, A

    2015-01-01

    This book introduces electric circuits with variable loads and voltage regulators. It allows to define invariant relationships for various parameters of regime and circuit sections and to prove the concepts characterizing these circuits. Generalized equivalent circuits are introduced. Projective geometry is used for the interpretation of changes of operating regime parameters. Expressions of normalized regime parameters and their changes are presented. Convenient formulas for the calculation of currents are given. Parallel voltage sources and the cascade connection of multi-port networks are d

  19. SEOP cross subsidization between electricity generation companies as a complementary concept to the tax on electricity?; SEOP-Quersubventionierung zwischen Stromproduzenten als Komplementaerkonzept zur Elektrizitaetssteuer?

    Energy Technology Data Exchange (ETDEWEB)

    Krumm, R.

    2000-07-01

    The electricity tax charged in Germany contributes to reducing carbon dioxide emissions in an indirect way, i.e. via the price policy, which is intended to reduce energy consumption. As the taxation approach does not differentiate between renewable or depletable primary energy sources, the tax does not create incentives for an ecologically favourable restructuring of the generation industry. The document in hand therefore explains a complementary approach which introduces the ecological dimension. It is recommended to add a fiscal approach called SEOP, Sectoral tax on Emissions with Output-determined Partial redistribution. Adopting this policy instrument would mean to implement a cross subsidization of low-emission or no-emission electricity generation technologies by the CO2-intensive generation technologies, as a demand-side or technology-based measure supporting the intentions of the tax. Introduction of the SEOP fiscal system is expected to achieve a significant abatement of carbon dioxide emissions due to electricity generation. (orig./CB) [German] Die in der Bundesrepublik erhobene Elektrizitaetssteuer leistet einen Klimaschutzbeitrag nur insoweit, als sie ueber die Induzierung von Preissteigerungen die Stromnachfrage mindert. Da die steuerliche Belastung fuer alle Primaerenergietraeger gleich hoch ist, setzt sie aber keinerlei Anreize fuer eine oekologische Umstrukturierung der Stromerzeugung. Vor diesem Hintergrund wird vorgeschlagen, die Elektrizitaetssteuer durch ein sogenanntes SEOP-Fiskalsystem zu ergaenzen, welches eine Quersubventionierung emissionsarmer und emissionsfreier Elektrizitaetsproduktion durch CO{sub 2}-intensive Stromherstellungsverfahren impliziert. Durch eine solche produktions- bzw. angebotsseitige 'Flankierung' der Elektrizitaetssteuer waere eine spuerbare Minderung der stromerzeugungsbedingten CO{sub 2}-Emissionen realisierbar. (orig.)

  20. Integrated Plant Safety Assessment: Systematic Evaluation Program. Yankee Nuclear Power Station, Yankee Atomic Electric Company, Docket No. 50-29. Final report

    International Nuclear Information System (INIS)

    1983-06-01

    The Systematic Evaluation program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Yankee Nuclear Power Station, operated by Yankee Atomic Electric Company. The Yankee plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  1. Integrated Plant Safety Assessment, Systematic Evaluation Program. Yankee Nuclear Power Station, Yankee Atomic Electric Company, Docket No. 50-29. Draft report

    International Nuclear Information System (INIS)

    1983-02-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Yankee Nuclear Power Station, operated by Yankee Atomic Electric Company. The Yankee plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  2. Divide and rule. The economic and legal implications of the proposed ownership unbundling of distribution and supply companies in the Dutch electricity sector

    International Nuclear Information System (INIS)

    Baarsma, B.; Nooij, M. de

    2007-01-01

    In Machiavelli's theory of power, the concept of 'divide and rule' forms the main theme: the ruler has absolute power and to maintain and increase such power all means are justified. When viewed against the background of this theory, the current debate in the Netherlands on the unbundling of energy (electricity, gas) companies can be observed as an example of 'divide and rule', in which the Dutch Minister of Economic Affairs plays a central role. Yet, contrary to Machiavelli in his time, the Dutch government does, in fact, aim principally at the greater welfare of the Dutch people. It is therefore noteworthy that, while important steps in the decision to unbundled have been taken, there is no evidence that the Dutch people will indeed benefit from the envisaged unbundling. (author)

  3. Divide and rule. The economic and legal implications of the proposed ownership unbundling of distribution and supply companies in the Dutch electricity sector

    International Nuclear Information System (INIS)

    Baarsma, Barbara; Nooij, Michiel de; Koster, Weero; Weijden, Cecilia van der

    2007-01-01

    In Machiavelli's theory of power, the concept of 'divide and rule' forms the main theme: the ruler has absolute power and to maintain and increase such power all means are justified. When viewed against the background of this theory, the current debate in the Netherlands on the unbundling of energy (electricity, gas) companies can be observed as an example of 'divide and rule', in which the Dutch Minister of Economic Affairs plays a central role. Yet, contrary to Machiavelli in his time, the Dutch government does, in fact, aim principally at the greater welfare of the Dutch people. It is therefore noteworthy that, while important steps in the decision to unbundled have been taken, there is no evidence that the Dutch people will indeed benefit from the envisaged unbundling

  4. The Tokai-mura JCO criticality accident and the activities of the accident countermeasure support team of Electric Power Companies, Japan

    International Nuclear Information System (INIS)

    Ogawa, Junko

    2000-01-01

    A criticality accident occurred at the JCO Tokai-mura nuclear fuel processing plant on September 30, 1999. This accident brought the damages which were unrivaled in the history of atomic energy development in Japan, seriously influencing the citizen life to such an extent as requesting for 320,000 inhabitants within 10 kilometers radius to stay indoors for as long as 18 hours. However, it could be said that though three workers suffered fatal injuries, no substantial hazards were made upon the regional inhabitants due to little release of radioactive substances. This video recorded the activities of the Accident Countermeasure Support Team of the Electric Power Companies immediately after the accident occurred, showing the chronological overview of the particulars of the accident. (author)

  5. Divide and rule. The economic and legal implications of the proposed ownership unbundling of distribution and supply companies in the Dutch electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Baarsma, B.; Nooij, M. de [University of Amsterdam (Netherlands). SEO Economic Research; Koster, W.; Weijden, C. van der [Norton Rose Advocaten and Solicitors, Amsterdam (Netherlands)

    2007-03-15

    In Machiavelli's theory of power, the concept of 'divide and rule' forms the main theme: the ruler has absolute power and to maintain and increase such power all means are justified. When viewed against the background of this theory, the current debate in the Netherlands on the unbundling of energy (electricity, gas) companies can be observed as an example of 'divide and rule', in which the Dutch Minister of Economic Affairs plays a central role. Yet, contrary to Machiavelli in his time, the Dutch government does, in fact, aim principally at the greater welfare of the Dutch people. It is therefore noteworthy that, while important steps in the decision to unbundled have been taken, there is no evidence that the Dutch people will indeed benefit from the envisaged unbundling. (author)

  6. Solar thermal power systems point-focusing thermal and electric applications projects. Volume 1: Executive summary

    Science.gov (United States)

    Marriott, A.

    1980-01-01

    The activities of the Point-Focusing Thermal and Electric Applications (PETEA) project for the fiscal year 1979 are summarized. The main thrust of the PFTEA Project, the small community solar thermal power experiment, was completed. Concept definition studies included a small central receiver approach, a point-focusing distributed receiver system with central power generation, and a point-focusing distributed receiver concept with distributed power generation. The first experiment in the Isolated Application Series was initiated. Planning for the third engineering experiment series, which addresses the industrial market sector, was also initiated. In addition to the experiment-related activities, several contracts to industry were let and studies were conducted to explore the market potential for point-focusing distributed receiver (PFDR) systems. System analysis studies were completed that looked at PFDR technology relative to other small power system technology candidates for the utility market sector.

  7. Final environmental impact report. Part I. Pacific Gas and Electric Company Geysers Unit 16, Geothermal Power Plant, Lake County, California

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The environmental analysis includes the following: geology, soils, hydrology, water quality, vegetation, wildlife, air resources, health and safety, noise, waste management, cultural resources, land use, aesthetics, socioeconomics, public services, transportation, and energy and material resources. Also included are: the project description, a summary of environmental consequences, and alternatives to the proposed action. (MHR)

  8. CO2 burden and climatic risk. Strategies of action of the German electricity supply companies. 2. rev. ed.

    International Nuclear Information System (INIS)

    1992-01-01

    According to indications of the working group for questions on the climate of the association of German electric utilities (VDEW), energy application of power generation contributes to the German CO 2 -emission with about 30%. A reduction of CO 2 -emissions in electro-economics can be achieved especially with a decrease of the application of fossil energy sources parallel to a better energy utilization (increase of the efficiency, enlargement of cogeneration) and through the expansion of power generation free from CO 2 (nuclear energy, renewable energy sources). (orig.) [de

  9. A Conceptual Model for the Creation of a Process-Oriented Knowledge Map (POK-Map and Implementation in an Electric Power Distribution Company

    Directory of Open Access Journals (Sweden)

    Babak Teimourpour

    2015-12-01

    Full Text Available Helping a company organize and capture the knowledge used by its employees and business processes is a daunting task. In this work we examine several proposed methodologies and synthesize them into a new methodology that we demonstrate through a case study of an electric power distribution company. This is a practical research study. First, the research approach for creating the knowledge map is process-oriented and the processes are considered as the main elements of the model. This research was done in four stages: literature review, model editing, model validation and case study. The Delphi method was used for the research model validation. Some of the important outputs of this research were mapping knowledge flows, determining the level of knowledge assets, expert-area knowledge map, preparing knowledge meta-model, and updating the knowledge map according to the company’s processes. Besides identifying, auditing and visualizing tacit and explicit knowledge, this knowledge mapping enables us to analyze the knowledge areas’ situation and subsequently help us to improve the processes and overall performance. So, a process map does knowledge mapping in a clear and accurate frame. Once the knowledge is used in processes, it creates value.

  10. Assessment of the prevalence of occupational accidents and their influential actors in an electricity distribution company during a five-year period.

    Science.gov (United States)

    Sadeghain, Marzieh; Farid, Ramin Ataei; Dormohammadi, Ali; Aghaei, Habib Allah; Rahmani, Abdolrasoul; Farhadi, Rozita; Eskandari, Rasoul; Karchani, Mohsen

    2013-01-01

    Occupational accidents have been considered as one of the most important crippling factors contributing to disabilities and life-threatening situations in many countries. This study was conducted to survey the prevalence of occupational accidents and the factors of that lead to injuries in an Electricity Distribution Company during a five-year period. In this descriptive study, the accident report form included items asking about the season of the year when the accident occurred, the ages and the average age of those injured, the type of employment, work experience, nature of the injuries that occurred, parts of the body affected, treatments that were applied, average number of days lost per accident, the levels of education of those involved, and their marital status. Data was analyzed using SPSS. A total of 66 Electricity Distribution Company workers were determined to be suffering from injuries due to accidents. The accidents mostly occurred in the summer (33%). Most of the injured workers (16.7%) belonged to the age groups of 25 to 29 and 40 to 44; there were no accidents reported for workers who were less than 20. About 48% of the accident victims had to be hospitalized. Furthermore, 35% of the accident victims were treated in outpatient clinics, and 7.4% of the accident victims died. We demonstrated that there were significant relationships between: 1) marital status and accidental injuries (P0.05) or work experience and the distribution of the accidents (P>0.05). This study indicated that most of the injuries in these accidents were related to the nature of employment, marital status, and level of education. The results showed the necessity for providing appropriate safety training for the workers.

  11. Assessment of the prevalence of occupational accidents and their influential actors in an electricity distribution company during a five-year period

    Science.gov (United States)

    Sadeghain, Marzieh; Farid, Ramin Ataei; Dormohammadi, Ali; Aghaei, Habib Allah; Rahmani, Abdolrasoul; Farhadi, Rozita; Eskandari, Rasoul; Karchani, Mohsen

    2013-01-01

    Background: Occupational accidents have been considered as one of the most important crippling factors contributing to disabilities and life-threatening situations in many countries. This study was conducted to survey the prevalence of occupational accidents and the factors of that lead to injuries in an Electricity Distribution Company during a five-year period. Methods: In this descriptive study, the accident report form included items asking about the season of the year when the accident occurred, the ages and the average age of those injured, the type of employment, work experience, nature of the injuries that occurred, parts of the body affected, treatments that were applied, average number of days lost per accident, the levels of education of those involved, and their marital status. Data was analyzed using SPSS. Results: A total of 66 Electricity Distribution Company workers were determined to be suffering from injuries due to accidents. The accidents mostly occurred in the summer (33%). Most of the injured workers (16.7%) belonged to the age groups of 25 to 29 and 40 to 44; there were no accidents reported for workers who were less than 20. About 48% of the accident victims had to be hospitalized. Furthermore, 35% of the accident victims were treated in outpatient clinics, and 7.4% of the accident victims died. We demonstrated that there were significant relationships between: 1) marital status and accidental injuries (P0.05) or work experience and the distribution of the accidents (P>0.05). Conclusion: This study indicated that most of the injuries in these accidents were related to the nature of employment, marital status, and level of education. The results showed the necessity for providing appropriate safety training for the workers. PMID:26120397

  12. The French Electricity Company (EDF) and GEC ALSTHOM have signed the agreement for Chinese Laibin B electric power plant; Electricite de France (EDF) et GEC ALSTHOM signent l'accord de la centrale electrique de Laibin B en Chine

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-03

    EDF and GEC ALSTHOM together with the government of Chinese Province Guangxi have organized in Pekin on 3 september 1997 a ceremony for signing a BOOT (Build, Own, Operate, Transfer) contract for the Coal Power Plant (2 x 360 MW) at Laibin B. This is the first Chinese BOOT contract in the power domain entirely financed by foreign capital. The two western companies which were retained for this project, following an international call for offers, invest USD 150 million of its own founds in this USD 600 million project. They will hold 60% and 40% of the capital of the company created for this project, respectively. The construction power plant is planned to be completed at the end of 1999 - beginning of 2000. After 15 years of industrial operation the power plant will be transferred to the autonomous government of the Province Guangxi. The communique contains the following 8 files: 1. The Laibin B power plant; 2. Build, Own, Operate, Transfer; 3. The autonomous Guangxi Province; 4. An outline of EDF in China; 5. Profile/activities of GEC ALSTHOM in China; 6. The 'Credit Agricole Indosuez' in China; 7. BZW Barclays PLC; 8. HSBC Investment Banking in China.

  13. Study on Municipal Energy Companies

    International Nuclear Information System (INIS)

    2009-07-01

    This is a summarizing overview of the local, renewable energy initiatives that are grouped under the heading of 'municipal energy company'. A municipal energy company (or sustainable energy company) is a local energy company that initiates, coordinates and/or manages sustainable energy projects with the primary objective of realizing the climate objectives. [nl

  14. Analysis model for the physical dimension in the environmental studies of electric transmission projects

    International Nuclear Information System (INIS)

    Garcia Gomez; Maria Aleyda; Caballero Acosta, Humberto

    2001-01-01

    This study makes a description and analysis of the physical aspects of the environment, which are contemplated, in the environmental studies of the projects of high voltage for electric transmission lines. Its meaning and out reach are defined in this projects, in its different phases of implementation; that is in the stages of design, construction and operation, making proposals to improve the adequate incorporation of physical dimension in the environmental activities. A very important aspect, worked out in the investigation, has to do with the way as this dimension is described in the real terms of reference for EIA of the Ministry of Environment; that is why it is analysed and some elements are proposed which are to correct and to articulate properly the information in these studies, because some problems were found in the articulation and contents of the physical aspects in the studies of environmental impact (EIA). Another very important aspect, which was obtained with this research, is the methodological proposal for the integration of the components of the physical dimension in which s ynthesis units are defined in different scales for the integration of those components. These facts will facilitate a better understanding of the natural processes in the areas of influence of the projects and a better understanding of the reciprocal relations between the project and the physical surroundings. In the process of searching a methodology for integration of the components of the physical dimension it is hoped that the studies be more congruent from the environmental point of view

  15. Safety evaluation report: related to the operation of Perry Nuclear Power Plant, Units 1 and 2, Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    Supplement No. 1 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group, CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 441). The facility is located near Lake Erie in Lake County, Ohio. This supplement has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  16. Design and analysis of electrical energy storage demonstration projects on UK distribution networks

    International Nuclear Information System (INIS)

    Lyons, P.F.; Wade, N.S.; Jiang, T.; Taylor, P.C.; Hashiesh, F.; Michel, M.; Miller, D.

    2015-01-01

    Highlights: • Results of an EES system demonstration project carried out in the UK. • Approaches to the design of trials for EES and observation on their application. • A formalised methodology for analysis of smart grids trials. • Validated models of energy storage. • Capability of EES to connect larger quantities of heat pumps and PV is evaluated. - Abstract: The UK government’s CO 2 emissions targets will require electrification of much of the country’s infrastructure with low carbon technologies such as photovoltaic panels, electric vehicles and heat pumps. The large scale proliferation of these technologies will necessitate major changes to the planning and operation of distribution networks. Distribution network operators are trialling electrical energy storage (EES) across their networks to increase their understanding of the contribution that it can make to enable the expected paradigm shift in generation and consumption of electricity. In order to evaluate a range of applications for EES, including voltage control and power flow management, installations have taken place at various distribution network locations and voltage levels. This article reports on trial design approaches and their application to a UK trial of an EES system to ensure broad applicability of the results. Results from these trials of an EES system, low carbon technologies and trial distribution networks are used to develop validated power system models. These models are used to evaluate, using a formalised methodology, the impact that EES could have on the design and operation of future distribution networks

  17. Emission Impacts of Electric Vehicles in the US Transportation Sector Following Optimistic Cost and Efficiency Projections.

    Science.gov (United States)

    Keshavarzmohammadian, Azadeh; Henze, Daven K; Milford, Jana B

    2017-06-20

    This study investigates emission impacts of introducing inexpensive and efficient electric vehicles into the US light duty vehicle (LDV) sector. Scenarios are explored using the ANSWER-MARKAL model with a modified version of the Environmental Protection Agency's (EPA) 9-region database. Modified cost and performance projections for LDV technologies are adapted from the National Research Council (2013) optimistic case. Under our optimistic scenario (OPT) we find 15% and 47% adoption of battery electric vehicles (BEVs) in 2030 and 2050, respectively. In contrast, gasoline vehicles (ICEVs) remain dominant through 2050 in the EPA reference case (BAU). Compared to BAU, OPT gives 16% and 36% reductions in LDV greenhouse gas (GHG) emissions for 2030 and 2050, respectively, corresponding to 5% and 9% reductions in economy-wide emissions. Total nitrogen oxides, volatile organic compounds, and SO 2 emissions are similar in the two scenarios due to intersectoral shifts. Moderate, economy-wide GHG fees have little effect on GHG emissions from the LDV sector but are more effective in the electricity sector. In the OPT scenario, estimated well-to-wheels GHG emissions from full-size BEVs with 100-mile range are 62 gCO 2 -e mi -1 in 2050, while those from full-size ICEVs are 121 gCO 2 -e mi -1 .

  18. Projection of fossil fuels consumption in the Venezuelan electricity generation industry

    International Nuclear Information System (INIS)

    Vidoza, Jorge A.; Gallo, Waldyr L.R.

    2016-01-01

    This study presents a prospective analysis on the impacts of recent efficient energy policies application in Venezuela, integrating both oil production and electricity supply to assess energy resources balance in a quantitative manner. A special focus is given to main fossil fuels used in the electric power industry; natural gas, diesel oil and fuel oil. Four scenarios were proposed, ranging from a low-economy-growth/low-efficiency scenario to an optimist high-economy-growth/high-efficiency scenario. Efficiency effects are more notorious for high-economy-growth case, fuel consumption for electricity generation reduces 38% for natural gas, 12% for diesel and 29% for fuel oil, in the established time period. Deficits in oil and gas Venezuelan production were also determined, deficits are highly affected by economical forecasting, and by fuel smuggling in Venezuelan borders. Results showed the high importance of energy efficiency policies development for Venezuela, in order to reduce fossil fuel domestic consumption to allocate them in a more profitable market. - Highlights: • We made a prospective analysis on efficient energy policies impacts in Venezuela. • Reduced fuel consumption was obtained for efficient scenarios. • Current energy regulations are not enough to encourage energy efficiency. • Hydroelectricity projects need more promotion to have deeper impacts.

  19. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  20. Portland General Electric Company report on the operating and startup experience with control and instrumentation and electrical systems at the Trojan Nuclear Plant

    International Nuclear Information System (INIS)

    Zimmerman, G.A.

    1977-01-01

    The Trojan Nuclear Plant is an 1178 MWe nuclear plant located on the Columbia River 40 miles northwest of Portland, Oregon. The Nuclear Stream Supply System vendor is Westinghouse with a General Electric turbine generator. The reactor is rated and licensed for 3423 MWt (1178 MWe) and the turbine generator is designed for 3570 MWt(1219 MWe). The startup phase testing of Trojan commenced on November 21, 1975, upon receipt of our NRC Operating License. The startup testing program was completed on May 22, 1976, following 100 hours of full-power operation, at which time a scheduled summer maintenance outage began. Some of the highlights and milestones of the startup testing program are described