  1. Edificios con forjados postesados mediante tendones no adherentes. Edificio Mapfre-Vía Augusta, en Barcelona-España

    Directory of Open Access Journals (Sweden)

    Llombart Jaques, José Antonio

    1994-08-01

    Full Text Available The technique of unbonded tendons applied to post-tensioned flat-slabs of buildings of certain importance has not been very frequent in Spain to date; in fact, it was used on very few occasions. This article gives the basic characteristics of the post-tensioned floors comparing them with the conventional solutions of reinforced concrete floors. The second part of the article brings a description of the main aspects of the design and construction of the Mapfre-Vía Augusta building in Barcelona. This recently raised building has the floor construction with slabs post-tensioned by unbonded tendons.

    La técnica del postesado no adherente, aplicada a losas de forjado de edificios de cierta entidad, ha sido hasta el momento poco común en España, habiéndose utilizado solamente en contadas ocasiones. Se indican, en primer lugar, las características fundamentales de los forjados postesados y se establecen comparaciones con soluciones convencionales de forjados de hormigón armado. En la segunda parte del artículo se describen los principales aspectos de proyecto y construcción de la estructura del Edificio Mapfre-Vía Augusta, en Barcelona, de reciente construcción, cuyos forjados están constituidos por losas postesadas mediante tendones no adherentes.

  2. Diseño de un nodo con arquitectura abierta para aplicaciones con redes inalámbricas de sensores (CRTECMOTE

    Directory of Open Access Journals (Sweden)

    Johan Carvajal Godínez

    2011-09-01

    Full Text Available Durante la última década las redes inalámbricas de sensores (WSN para la protección del medio ambiente surgen como área de investigación y desarrollo gracias a los avances en la microelectrónica, la ingeniería de computadoras y las ciencias de los materiales. Aspectos relevantes que han determinado el interés en esta área de investigación son, entre otros, la capacidad de mitigar el impacto al ambiente por consecuencia de actividades productivas, especialmente agrícolas, mediante la monitorización y control de variables de entrada para dicho proceso. Este artículo trata sobre la metodología con la cual se aborda el diseño, la optimización y la puesta en marcha de una infraestructura electrónica que funcione como herramienta para la adquisición de datos y tratamiento de información para la generación de modelos descriptivos que permitan atacar aquellos fenómenos que tienen mayor incidencia en la degradación de los recursos naturales que rodean las zonas geográficas productivas. El resultado obtenido mediante la investigación llevada a cabo fue el diseño de un nodo para red inalámbrica de sensores especializados en adquisición y procesamiento de datos, así como la selección de la arquitectura de red y las tecnologías de comunicación con las que se planea implementar la conexión de los nodos con un sistema central de adquisición y almacenamiento de la información (sumidero. El artículo concluye con la justificación del diseño de la red, cuya topología jerárquica se adapta a las necesidades de cobertura geográfica, costo de la infraestructura y capacidad de escalamiento de la red inalámbrica de sensores.

  3. Diseño e implementación de un nodo con portal cautivo aplicado a redes Wi-fi en software libre

    OpenAIRE

    Roque Tito, Edwin

    2010-01-01

    Un Portal Cautivo es un programa de una red informática que vigila el tráfico HTTP y fuerza a los usuarios de una red a garantizar su acceso a las funciones de la red Wi-Fi, así como navegar por Internet de forma normal; el presente trabajo de investigación aplicada se tituló "Diseño e Implementación de un Nodo con Portal Cautivo Aplicado a Redes Wi-Fi en Software Libre", y se localizó en la ciudad de Puno, con la finalidad de, habilitar acceso seguro a la red para usuarios, mediante un Web B...

  4. Edificios Públicos

    Directory of Open Access Journals (Sweden)

    Gonzalo Cerda Brintrup

    1988-06-01

    Full Text Available El edificio de la gobernación ocupaba la calle O'Higgins esquina Gamboa. Construido de madera, de dos pisos y de una arquitectura coherente con el entorno, comprendía la casa del gobernador, las oficinas públicas y el Correo. Se incendió en 1971 cuando era gobernador don Celedonio Cárdenas.

  5. Edificio Ford

    Directory of Open Access Journals (Sweden)

    Skidmore, Owings y Merrill, Arquitectos Ingenieros

    1962-07-01

    Full Text Available El nuevo y moderno Centro Administrativo de la Ford ocupa una de las dos torres prismáticas de la Ciudad del Automóvil, entre las cuales, un edificio bajo y espacioso que se destina a garaje, cumple el papel de plaza y jardín. Los tres bloques fundamentales están servidos por una compleja y perfecta red de tráfico rodado de acceso a los diversos servicios a distintos niveles, resuelta con maestría encomiable y funcionalismo excepcional.

  6. Thermal responses and its relation with the building outdoor conditions; Respuestas termicas y su relacion con la envolvente del edificio

    Energy Technology Data Exchange (ETDEWEB)

    Marincic, Irene [Universidad de Sonora, Hermosillo, Sonora (Mexico); Isalgue, Antoni [Universidad Politecnica de Cataluna, Barcelona (Spain)

    2000-07-01

    entran y salen de los mismos, identificando tanto los fenomenos termicos mas relevantes que intervienen, como los factores geometricos y propiedades fisicas que influyen modificando el balance termico de cada sistema. En el presente trabajo se analiza el comportamiento termico experimental en edificios, en relacion con el ambiente exterior. Mas especificamente, la respuesta termica en el interior del edificio a diferentes distancias de la envolvente del mismo, teniendo en cuenta las distintas situaciones de aislamiento termico. Basandonos en datos medidos de temperatura en viviendas de construccion urbana tradicional, se analizan los efectos sobre la respuesta termica dependiendo de la distancia del punto considerado a la envolvente, considerando el grado de aislamiento termico que los separa. Mediante el uso de una metodologia basada en la funcion de transferencia experimental del edificio, se evalua el comportamiento termico tanto en el espacio temporal como en el frecuencial. Con esta metodologia, es posible evidenciar fenomenos y obtener parametros termicos que caracterizan a los aspectos dinamicos de la respuesta termica. El objetivo principal es extraer informacion del analisis de edificios, con el fin de extrapolar las conclusiones del comportamiento para el diseno termico apropiado de otras construcciones similares. Del analisis de respuestas termicas en diferentes localizaciones espaciales, se concluye que la distancia desde el envolvente (asi como las propiedades de la misma) tiene gran influencia sobre los efectos de inercia termica, que modifican en forma importante la respuesta, con cierto paralelismo con el efecto piel en la penetracion de campos electromagneticos en conductores. La localizacion espacial implica una cierta masa termica involucrada en cada caso, y esta a su vez, controla la penetracion de la oscilacion termica exterior.

  7. Edificios industriales. Wiesbaden

    Directory of Open Access Journals (Sweden)

    Ohlig, R.

    1962-09-01

    Full Text Available La fábrica de cemento Dyckerhoff, de Wiesbaden-Amoneburg, decidió la construcción de dos edificios industriales con objeto de dar cabida a las instalaciones necesarias para la fabricación de cemento Portland blanco como parte suplementaria a la fábrica ya existente. En uno de estos edificios se han instalado cinco molinos de cemento en dos naves, y aún queda espacio para la instalación de otros dos. Este edificio tiene en planta 50 x 28 m. El otro edificio, destinado al almacenamiento de clinker, es de 29 x 50 m en planta. El profesor E. Neufert, de la Asociación alemana de Arquitectos, que se encargó de la parte artística, llegó a la solución de cubrir ambos edificios con una lámina formando módulos cilíndricos y de hormigón armado. El cuerpo de los edificios es de arquitectura cúbica y soportes prismáticos.

  8. Edificio Eiffel

    Directory of Open Access Journals (Sweden)

    Niemeyer, Oscar

    1957-11-01

    Full Text Available Oscar Niemeyer ha resuelto este bloque de viviendas con originalidad de fachadas y acertada composición de volúmenes. Su emplazamiento, en la Plaza de la República de Río de Janeiro, ha sido felizmente aprovechado al resolver su alzado principal a ella con gran diafanidad, alternando las superficies acristaladas y paneles de piezas prefabricadas perforadas. El cuerpo central se eleva airoso sobre los laterales, más bajos, apoyándose todo el conjunto sobre una base de apariencia mas sólida —la zona comercial—, cuyo cuerpo superior, liso y blanco, está monótonamente modulado por una serie de pequeñas ventanas. El edificio se destina a viviendas. En él se distribuyen 54 apartamentos, todos ellos de tipo Duplex, con absoluta separación entre las zonas nobles y de servicio. De sus 12.800 m2 de superficie construida, sólo 9.940 m2 son de área útil.

  9. Cuantificación de la densidad de capilares sanguíeos en el nodo sinusal de pacientes con fibrilación auricular cróica

    Directory of Open Access Journals (Sweden)

    Aquilino Hurlé

    2008-07-01

    Conclusiones: La FA crónica se asocia a una reducción significativa de la microcirculación del nodo sinusal. Esto apoyaría la hipótesis de que la isquemia del nodo sinusal podría resultar relevante en la patogenia de dicha arritmia.

  10. Edificio de viviendas. Ginebra

    Directory of Open Access Journals (Sweden)

    Gaillard, André

    1959-01-01

    Full Text Available En las afueras de Ginebra, cerca de la estación central de Cornavin, se ha levantado este inmueble de viviendas. El edificio, con tres fachadas, consta de seis plantas y un ático, aparte de la planta baja y dos sótanos, teniendo un total de 31 apartamentos y un estudio.

  11. DESARROLLO DE UN SIMULADOR DE EDIFICIO CON PARÁMETROS VARIABLES

    Directory of Open Access Journals (Sweden)

    Andrés Enrique Rosso Mateus

    2009-01-01

    Full Text Available Este artículo expone la metodología de implementación de un simulador de edifi cio teniendo en cuenta factores de desarrollo como la escalabilidad del software, su ciclo de desarrollo y los detalles matemáticos usados para el modelamiento del sistema.Muestra además una metodología sencilla y efi caz para la simulación de cualquier tipo de sistema, en la cual se exponen las librerías de programación que se encontraron más útiles para este tipo de desarrollo. Este simulador representa un edifi cio real con todas las características y variables que interesan para el caso y se pretende usar para probar algoritmos de control para grupos de elevadores [10]. La arquitectura del simulador permite acoplar cualquier algoritmo de control que siga el estándar propio del simulador, se muestran como ejemplo dos algoritmos de control los cuales son ingresados en el simulador para probar su desempeño [10]. El simulador permite generar reportes estadísticos del desempeño de los controladores usados, estos reportes son útiles a la hora de comprobar la efi ciencia de estos y de comparar cuantitativamente el funcionamiento entre ellos.

  12. Edificio Creole

    Directory of Open Access Journals (Sweden)

    Lathrop Duglass

    2017-06-01

    Full Text Available En la Caracas actual, una de las ciudades más modernas del mundo, donde se levantan soberbios edificios de avanzadas líneas, se ha construido éste, siguiendo las directrices simplistas y de funcionalismo, características y propias de nuestra época.

  13. Estimación adaptable de estados en un edificio de marco plano equipado con un amortiguador magneto-reológico

    Directory of Open Access Journals (Sweden)

    René Jiménez-Fabián

    2008-01-01

    Full Text Available Resumen: Se presenta un observador adaptable para un edificio equipado con un amortiguador magneto-reológico. Este observador es capaz de reconstruir los parámetros estructurales, las posiciones y las velocidades absolutas de los pisos a partir de mediciones de aceleración. Estas señales son reconstruidas en forma explícita gracias a que el esquema propuesto no requiere de formas canónicas ni transformaciones de estados. El desempeño de este observador se ilustra con resultados experimentales obtenidos en una estructura de escala reducida. Palabras clave: Observador adaptable, amortiguador magneto-reológico, identificación de parámetros, control de estructuras

  14. Construcción de edificios con elementos-cajones, de hormigón ligero, unidos por pretensado – Rumanía

    Directory of Open Access Journals (Sweden)

    Halmagiu, Mircea

    1974-06-01

    Full Text Available This article presents a Rumanian construction system to build multistoried buildings by using «boxes» of lightweight concrete, that are finally joined by prestressed concrete. The article describes the project and the execution of the mentioned boxes, their structure and their original installations. The box-cell type is 3.60 x 5.60 x 2.75 m and weighs 15.2 t. It was delivered completely finished and equipped. The research done on this technology is described as well as the project of an experimental building that is being constructed at present.En este artículo se presenta un sistema de construcción rumano, para realizar edificios de varias plantas, utilizando «cajones» de hormigón ligero con unión definitiva por pretensado. Se describe el proyecto y ejecución de los citados cajones, de su estructura y de sus originales instalaciones. La caja-célula tipo tiene 3,60 x 5,60 x 2,75 m y pesa 15,5 t. Se entregó completamente terminada y equipada. Se habla de las investigaciones emprendidas, así como del proyecto de un edificio experimental que se está construyendo actualmente.

  15. “estudio y simulación energética del edificio de la fiec con energyplus”

    OpenAIRE

    Briceño Maldonado, Richard Manuel

    2013-01-01

    En este documento se presenta el estudio energético y análisis de cargas térmicas del edificio de la Facultad de Ingeniería en Electricidad y Computación. El objetivo principal es realizar recomendaciones para disminuir la demanda de energía eléctrica debido a la excesiva carga térmica generada por los lucernarios de policarbonato alveolar. Se analizaron varias herramientas informáticas, y mediante matriz de decisión, se escogió a la denomina EnergyPlus. Se realizaron seis comparaciones a tra...

  16. “estudio y simulación energético del edificio de la fiec con energyplus”

    OpenAIRE

    Briceño Maldonado, Richard Manuel; Peña Toro, Ph.D. Paulo

    2013-01-01

    En este documento se presenta el estudio energético y análisis de cargas térmicas del edificio de la Facultad de Ingeniería Eléctrica y Computación. El objetivo principal es realizar recomendaciones para disminuir la demanda de energía eléctrica debido a la excesiva carga térmica generada por los lucernarios de policarbonato alveolar. Se analizaron varias herramientas informáticas, y mediante matriz de decisión, se escogió a la denomina EnergyPlus. Se realizaron seis comparaciones a través de...

  17. Edificio Tavaro, Ginebra

    Directory of Open Access Journals (Sweden)

    Addor y Julliard, Georges

    1961-10-01

    Full Text Available El edificio se ha construido con fines administrativos, con objeto de agrupar las oficinas y zonas de recepción, de la fábrica de máquinas de coser "Elna". Mediante la distribución en planta y en sentido netamente longitudinal, a lo largo de la carretera Chatelaine y con retranqueo respecto de esta vía de gran tráfico y ruido, así como previendo un gran espacio verde entre esta pantalla constructiva de líneas modernas y la fábrica, situada al fondo .del solar, se ha conseguido aislar las oficinas de ambas zonas ruidosas.

  18. Los edificios de apartamentos del Movimiento Moderno en Camagüey: Un valioso patrimonio a conservar desde los proyectos y con la participación social

    Directory of Open Access Journals (Sweden)

    Dianelis Falls Valdivieso

    2016-06-01

    Full Text Available El centro histórico de Camagüey, declarado Patrimonio Cultural de la Humanidad en 2008, atesora un número considerable de edificios correspondientes al Movimiento Moderno, construidos en la década de 1950, que sufren actualmente modificaciones para satisfacer nuevas necesidades de la población que reside en ellos. Lamentablemente, las intervenciones en el patrimonio no siempre han contado con la asesoría técnica ni con la participación ciudadana necesarias para asegurar, por un lado, respuestas a los requerimientos de la población y, por otro, el resguardo del valioso patrimonio que atesora la ciudad. Ante esta problemática, los proyectos de investigación que articulan la participación de académicos-investigadores, profesionales y estudiantes, constituyen una vía eficaz para alcanzar soluciones acertadas. Mediante un análisis histórico-arquitectónico de los inmuebles, un diagnóstico detallado de las transformaciones y el criterio técnico de los profesionales, así como la incorporación de la población residente a través de las encuestas realizadas; se aborda aquí mecanismos para garantizar un pensamiento de respeto, (hacia los valores espaciales y ambientales que brindan las soluciones de estos inmuebles valoración y sensibilización hacia las condiciones espaciales y ambientales que brindan las soluciones de estos inmuebles, las que están dirigidas a dar bienestar social a quienes los habitan y, al mismo tiempo, deben ser conservadas para legarlas a la sociedad. 

  19. Edificio Van Leer. Holanda

    Directory of Open Access Journals (Sweden)

    Breuer, Marcel

    1965-02-01

    Full Text Available This building houses the offices of a large industrial firm. The central part of the building is H shaped and has two floor. The general services, washrooms, dressing rooms, stores, archive and mechanical equipment are housed on the ground floor. This level also provides communication between the offices in the wings and the staff canteen. The top floor has a hall-cum-reception room, the exhibition of the firms products and a section of the offices. The two lateral wings, which are Y shaped in planform, are taken up with offices on both floor levels. This building clearly shows the touch of a master designer in its layout, finish and details. It is a most perfect solution in terms of its location, its function and its human requirements.El complejo aloja las oficinas de una gran empresa industrial. El cuerpo central del edificio principal—en forma de H—tiene dos plantas: la baja comprende los servicios generales, aseos y vestuarios para empleados, almacenes, archivo, equipos mecánicos, etc., y sirve de calle y comunicación entre los niveles inferiores de las alas de oficinas y la cantina para empleados. La planta alta alberga el vestíbulo, utilizado también como sala de recepción, espera, exposición de los productos fabricados por las factorías de la empresa y parte de oficinas. Las dos alas laterales—con plantas en forma de V—alojan, en sus dos niveles, las oficinas generales. El planteamiento, acabado y detalles de este inmueble muestran la mano de un maestro, que ha realizado un trabajo perfecto, teniendo en cuenta el emplazamiento—Holanda—, el lugar y el cometido a que se destina el edificio.

  20. Edificio en Bolonia

    Directory of Open Access Journals (Sweden)

    Tagliaventi, Ivo

    1964-06-01

    perseguido con la elección y colocación de los materiales, empezando por el hormigón armado, cuyas estructuras se han dejado parcialmente vistas, tanto en el exterior como en el interior. 43 El planteamiento y programa de los diversos apartamentos fue estudiado de manera que no resultasen demasiado costosos—ya que por razones fiscales, debían pertenecer al tipo medio—, y que se diferenciasen, entre sí, sólo por pequeñas variaciones. Se ha conseguido, con éxito, una correspondencia vital y dinámica de las fachadas, con el ambiente circundante, mediante el movimiento de los alzados y volúmenes del edificio.

  1. Edificio Cogesol, en Madrid

    Directory of Open Access Journals (Sweden)

    Alas, Genaro

    1964-05-01

    del solar, la norte, es decir, la correspondiente a la autopista de Barajas, es la de mayor importancia, se desplazó hacia allí el edificio de la fábrica; en la parte central se situó el patio de carga, y al sur, lindando con la calle de distribución, los bloques para oficinas, personal y vivienda del guarda. La estructura de la torre de fabricación es metálica, esbelta y limpia. Las jácenas verticales y horizontales de arriostrado han quedado ocultas, aprovechando la fachada posterior, el tabique intermedio de separación, la caja del ascensor y el forjado de cubierta. Por lo que se refiere a la jácena de arriostrado longitudinal, situada en la caja del ascensor, hubo que interrumpirla en la cota 7,20 m—ya que los ascensores tienen la entrada por debajo—, y fue necesario referir el empuje horizontal de viento en sentido longitudinal (desde esta cota hacia abajo al edificio adjunto a la torre, construido con estructura de hormigón. Como entre ambos edificios existe una junta de dilatación, los elementos que transmiten el citado empuje horizontal son suficientemente flexibles para permitir el juego de la junta. El montaje de los soportes largos se realizó por tramos, cuidando extraordinariamente las soldaduras en obra, para evitar deformaciones, que hubieran quedado muy de manifiesto al terminarse la fachada. Desde el punto de vista estético, se destaca claramente la zona de fábrica—tratada con un cerramiento a base de cristal, de modo que se vea toda la maquinaria desde el exterior—de la zona de almacenes, cuyo cerramiento ha sido realizado con ladrillo visto; la sensación de diafanidad que con ello se ha conseguido y el acertado juego de volúmenes de los distintos cuerpos de edificación, imprimen a este conjunto orgánico industrial una atractiva espectacularidad.

  2. Edificio Atalaya Barcelona

    Directory of Open Access Journals (Sweden)

    Correa, Federico

    1975-02-01

    Full Text Available This unique building, situated at the crossing Diagonal-Carretera of Sarría of Barcelona, consists of four basements, two levels for premises and offices that occupy the entire site and of twenty two of apartments that assume the shape of a cross so as to obtain the maximum independence of view between the different wings, in addition to other aesthetic and volumetric considerations. The structure is of reinforced concrete with flat floors without beams and the curtain walls of prefabricated pieces and artificial stone. An attempt has been made, and we consider the aim to have been achieved to construct a well planned and well balanced tall building, viewed from close by as well as from a distance.Este edificio singular, situado en el cruce Diagonal-Carretera de Sarria, de Barcelona, consta de cuatro plantas de sótanos, dos de locales y oficinas que ocupan todo el solar y veintidós de apartamentos, que adoptan la forma de cruz gamada con el fin de conseguir la máxima independencia de vistas de unos con respecto a otros, aparte de otras consideraciones estéticas y volumétricas. La estructura es de hormigón armado con forjados planos, sin vigas, y los cerramientos, modulares, de piezas prefabricadas de piedra artificial. Se ha pretendido, y consideramos logrado, el doble efecto de un rascacielos humano que se aprecia ponderado y equilibrado, tanto si se mira desde lejos como si se contempla desde cerca.

  3. Edificio Daily Mirror

    Directory of Open Access Journals (Sweden)

    Williams, Owen

    1963-07-01

    Full Text Available The building has 18 levels. The Press occupies the 4 basement floors. The ground floor is taken up with the entrance hall, and an indoor carriage way. A snack bar and the telephone operators are situated on the second floor. The production department and the medical services are located on the third storey, whilst the fourth is occupied by the offices and library. The fifth floor is the beginning of the higher section of the building. This floor and up to including the 11th floor are devoted to office space, except for the 10th storey, which contains the office apartments of the directors and the Council Chamber. Equipment related to various services of the building is housed on the 12th storey. Finally, this tall building constitutes a fine landmark in the London skyline. The Daily Mirror building is outstanding for the appropriate nature, the completeness and the quality of its installations, which thus provide the most widely read paper in the world with outstandingly efficient offices.Este edificio consta de 18 plantas. El cuerpo de Prensa se aloja en los cuatro sótanos; los vestíbulos de entrada y una calzada interior para vehículos se hallan en la planta baja; la primera alberga un snack-bar y centralita telefónica; la segunda, el departamento de producción y centro de asistencia médica, y la tercera, las oficinas y biblioteca principales. La cuarta planta señala el comienzo del bloque alto; esta planta, junto con las quinta, sexta, séptima, octava y décima, están dedicadas a oficinas. La novena contiene las oficinas-apartamentos de los directores y salas de Consejo, y la undécima, la maquinaria para las diversas instalaciones del edificio. La elevada torre constituye un grandioso hito de referencia en esta zona de Londres. El «Daily Mirror» se distingue por el acierto, número y perfección de sus instalaciones, que proporcionan, al periódico de mayor actualidad mundial, las más adecuadas y amplias oficinas modernas.

  4. Edificio Mixto, Ginebra

    Directory of Open Access Journals (Sweden)

    Bussat, P.

    1961-04-01

    Full Text Available Se trata de un edificio doble, cuyos pisos superiores están reservados para viviendas particulares, el entresuelo para locales administrativos y la planta baja para almacenes y otros locales comerciales.

  5. Edificio industrial, en Kuwait

    Directory of Open Access Journals (Sweden)

    Farmer y Dark, Arquitectos

    1963-11-01

    consecuencia la construcción de grandes centrales eléctricas. La central «A» es uno de los varios edificios que constituyen el grupo suministrador de energía y agua potable a Kuwait; dispone de cuatro turboalternadores, y se ha estudiado, para el interior, una presión y movimiento del aire, suficiente para contrarrestar la acción del exterior e impedir la entrada de la arena que arrastran las tempestades frecuentes. En cuanto al aspecto de sus fachadas, se ha pretendido conseguir que armonicen con los edificios circundantes. La línea arquitectónica es audaz e irregular, buscando variedad de perfiles y diversos juegos de luces y sombras, que recuerden las construcciones indígenas de barro, con formas puras y elementales, pero quebradas y redondeadas por la acción del tiempo. El color en los interiores ha sido estudiado para dar la impresión de frescura; en el exterior sólo se han pintado las zonas que podían reflejar molestamente los rayos solares. El conjunto resulta agradable, dentro de su sencillez, cual corresponde a una instalación de tipo industrial, y no faltan detalles de buen gusto y de preocupación por la gente que ha, de permanecer allí algunas horas del día, como ocurre con el balcón de las oficinas, que mira al mar, y el estanque y zonas verdes del parque de entrada.

  6. Método de cálculo de comportamiento térmico de cerramientos de edificios con materiales de cambio de fase

    OpenAIRE

    Urresti González, Aitor

    2017-01-01

    331 p. El almacenamiento de energía térmica en forma de calor latente puede ser una buena medida para reducirla demanda tanto de refrigeración como de calefacción de los edificios. EL fuerte comportamiento nolineal de este tipo de almacenamiento requiere de un buen análisis previo de las propiedades para unaprovechamiento óptimo. El presente trabajo recoge todo el proceso de selección de un material decambio de fase: desde la medición de propiedades térmicas, pasando por la definición de u...

  7. Edificios industriales, en Wesel, Alemania

    Directory of Open Access Journals (Sweden)

    Henn, Walter

    1966-02-01

    Full Text Available The set of buildings constructed in Wesel by Siemens-Schuckertwerke is a factory of industrial turbines. The site has a railway siding, which greatly helps the transport of raw materials and finished articles. In addition to the industrial naves, there are offices, social amenities, and administrative buildings. The workshop naves have a reinforced concrete structure, and on the inner columns, longitudinal reinforced concrete girders support a travelling crane. The roof of these naves is provided with skylights, inclined at 45° to the horizontal, and symmetrically arranged in pairs. The roof is protected with a Siporex insulating layer, covered with two sheets of bitumen impregnated cardboard. The glazing of the skylights is Thermolux.El complejo de edificios industriales construidos en Wesel por Siemens-Schuckertwerke, está destinado a la fabricación de turbinas industriales. Se levanta sobre un extenso solar con acceso a una vía férrea, lo cual facilita el suministro de materias primas y expedición de los productos fabricados. El conjunto está formado por un edificio para la administración, otro de carácter social y recreo, otro para oficinas y varias naves para producción, almacenes y bancos de prueba. Las naves tienen estructuras de hormigón armado. En su interior se ha instalado un puente-grúa en sentido longitudinal, que se apoya en los soportes interiores. Para la suspensión de los carriles del puente-grúa se han construido vigas longitudinales de hormigón armado. La cubierta tiene una serie de lucernarios, de dos faldones a 45° que culminan en su caballete. Todas las superficies de cubierta se han protegido con una capa aislante de siporex recubierta con otras dos de cartón embreado. Las cristaleras y lucernarios son de thermolux.

  8. Edificio "Forestal Bío-Bío"

    OpenAIRE

    Gonzalo Cerda Brintrup

    1992-01-01

    "Serie Concepción" es una nueva sección que inauguramos con este número, destinada a mostrar edificios de la ciudad de Concepción, que destacan por sus cualidades arquitectónicas. Constituye, por consiguiente, un catastro de arquitectura contemporánea, que busca abrir un espacio para el análisis de la producción arquitectónica de nuestra ciudad.

  9. Instalaciones del edificio de Costillares

    Directory of Open Access Journals (Sweden)

    Laorden, José

    1999-08-01

    Full Text Available Not available

    Se describen las instalaciones de calefacción y refrigeración, fontanería, gas, central eléctrica, iluminación, teléfonos y aislamiento térmico del edificio construido en Chamartín de la Rosa para sede del instituto Técnico de la Construcción y del Cemento, dando las consideraciones generales que sirvieron para proyectarlas y analizando después para cada una de ellas las bases del proyecto, su ejecución y, finalmente, los primeros resultados de su funcionamiento. De especial interés creemos los comentarios que hacemos sobre algunos errores de proyecto o de ejecución, con lo cual quizá se puedan evitar en otros trabajos.

  10. Edificio Adriaan Volker, en Rotterdam – Holanda

    Directory of Open Access Journals (Sweden)

    van Dommelen Kross, Maaskant

    1975-12-01

    Full Text Available The main characteristic of this 17 storey building that is designed for the offices of the firm «Adriaan Volker» is its very irregular shape with projecting and re-entrant parts over the entire construction. The building consists of two vertical communication shafts containing staircases, lifts, hoists and W.Cs. These shafts are on each floor surrounded by offices that are planned in an open manner, a space saving method to avoid corridors. The structure is of concrete with double T slabs for the ceiling and 43 cm thick prefabricated supporting walls. The unit is being completed by an adjacent 3 storey garage construction and sorrounding gardens.La característica principal en el diseño del edificio de 17 plantas, destinado a oficinas para la firma Adriaan Volker, es su forma muy irregular, con cuerpos entrantes y salientes que se mantienen en toda su altura. El edificio consta de dos núcleos de comunicación vertical que contienen escaleras, ascensores, montacargas y aseos, rodeados en cada planta por las oficinas, dispuestas según el tipo abierto, por la economía de espacio que supone la supresión de pasillos. La estructura del edificio es de hormigón, con dobles losas en T para los forjados, y muros portantes prefabricados de 43 cm de espesor. El edificio se completa con una construcción adyacente de tres plantas, destinadas a garaje, y unas zonas ajardinadas.

  11. Optimización operacional de redes de distribución de agua potable con el fin de maximizar la uniformidad de presiones en los nodos de consumo

    Directory of Open Access Journals (Sweden)

    Diego Alejandro Araque Fuentes

    2005-11-01

    Full Text Available En el presente trabajo se muestra que con el desarrollo de un algoritmo determinístico se logra uniformizar el estado de presiones de servicio en una red de distribución de agua potable. Para lograr esto de forma óptima, se debe maximizar un Índice que relaciona la potencia por unidad de peso disipada por la red y disponible para disipar por la misma (Índice de Resiliencia [2], lo cual mejora la habilidad del sistema de distribución para enfrentar eventuales fallas en el mismo, retarda los procesos de renovación de tuberías y minimiza el nivel de fugas en la red. / The present paper will show that throughout the development of a deterministic algorithm the uniformity of the pressure service level in the Water Distribution Network (WDN can be maximized. To obtain this in an optimal way, one must maximize an Index that relates the power by unit of weight dissipated by the network and the power by unit of weight available to dissipate by the same one (Resilience Index [2], it improves the ability of the WDN to cope with possible failures in the system, slows down the pipes renovation processes and diminishes the level of leaks in the network.

  12. Edificio Pirelli – Barcelona

    Directory of Open Access Journals (Sweden)

    Bona, Eusebio

    1959-01-01

    Full Text Available El edificio tiene un frente principal de 39,53 m y una profundidad de 25 m, o sea, una superficie de 966 m2 la cual, levantada hasta la altura permitida, da un desarrollo total de superficies construidas de 12.341,89 m2 incluida la edificada en el patio interior de manzana, y un volumen de 39.765 m2 aproximadamente. El edificio consta de dos plantas de sótanos, a un nivel de 8,55 m por debajo de la rasante de la calle; planta baja; siete plantas de igual superficie, y la octava y novena plantas retranqueadas. Sobre la planta de cubierta, construida en techo plano, se manifiestan tres volúmenes unidos entre sí, que contienen un depósito de agua y las máquinas de los elevadores.

  13. Edificio en terraza - Viena (Austria

    Directory of Open Access Journals (Sweden)

    Wörle, E.

    1972-03-01

    Full Text Available This building is located on the side of a hill, at Modling, hence the curious stepped up arrangement of the design, to adapt itself to the nature of the site. There are 30 dwellings whose useful areas vary between 80 and 150 m2, and additionally 5 apartments of 50 to 85 m2. Each has its own terrace and artificial garden, also parking space. The general style is sober, both inside and in its external aspect.El conjunto está situado en la ladera de un monte cuajado de flores amarillas, en Modling, adoptando esta curiosa forma escalonada en función de la fisonomía del solar elegido. Hay un total de treinta viviendas con superficies útiles de 80 a 150 m2; cinco apartamentos de 50 a 75 m2 útiles, cada uno, con su correspondiente terraza ajardinada, garaje y aparcamiento, además de otros edificios similares, todos ellos tratados con gran dignidad interior y exterior.

  14. Edificio deportivo en Ludwigshafen, Alemania

    Directory of Open Access Journals (Sweden)

    Rainer, R.

    1968-10-01

    Full Text Available The project built at the Ebert Park occupies a rectangular site. A main feature of its central nucleus is a square hall, of 60 by 60 m area, which can house 2400 seated spectators. The shell roof of this ball is outstanding. It is a hyperbolic parabolid, which covers a large area with a minimum of material. Another noteworthy feature is the strong and harmonious design of this hall, which consists essentially of a monolithic rcjof, made of precast parts, and a powerful prestressed boundary girder resting oh piles, which take up the vertical loads, whilst a great prestressed concrete, tie member, of 110 m length, reacts the horizontal thrust component of the roof loads.El conjunto, edificado en el parque Ebert, ocupa una superficie rectangular en planta. En su núcleo central está ubicado el pabellón principal, de planta cuadrada (60x60 m y con capacidad para albergar 3.400 espectadores sentados. Resalta en este conjunto la cubierta del tipo laminar de dicho pabellón, con forma de «paraboloide hiperbólico», que resuelve acertadamente el problema de la cobertura de un gran espacio con un mínimo de material. Destacaremos igualmente la plástica recia y armónica del edificio, su calidad y textura y el sistema constructivo adoptado, que consiste esencialmente en una cubierta monolítica —a base de elementos prefabricados—, las poderosas vigas de borde, pretensadas, y la cimentación de pilotes que absorben la componente vertical de empujes, dejando al gran tirante inferior, de 110 m y hormigón pretensado, la misión de contrarrestar la componente horizontal del empuje transmitido por la cubierta.

  15. Edificio de viviendas de obra nueva

    OpenAIRE

    Izquierdo Bonillo, Miguel Ángel

    2015-01-01

    Se va a construir un edificio de viviendas de uso residencial en la población de San Pedro del Pinatar. El proyecto básico y de ejecución de un bloque de viviendas es solicitado por la Universidad Politécnica de Cartagena y será realizado por Miguel Ángel Izquierdo Bonillo, con D.N.I. 75148358-K, y se desarrolla ajustándose al programa de necesidades y sugerencias de la Universidad Politécnica de Cartagena, dirigido por el tutor Juan Francísco Maciá Sánchez, en consecuencia ...

  16. Ensayo en Lima (Perú de edificio de adobe sismorresistente construido con el sistema de albañilería integral

    Directory of Open Access Journals (Sweden)

    Vega, S.

    2009-09-01

    de mortero. Se hace necesario que las armaduras transmitan los esfuerzos entre sí. Las armaduras, en forma de cercha, se pueden cruzar en las tres direcciones del espacio, lo que permite la construcción de muros y forjados. De esta manera sólo se necesita un posterior relleno con bloques de adobe o el tablero del forjado para que el conjunto tenga la rigidez suficiente. Para verificar la seguridad de este nuevo tipo de edificación para su construcción en zonas sísmicas del tercer mundo, se ha ensayado a sismo un prototipo realizado con el sistema SAI con adobe, de 6x6x6 m y dos plantas a escala 1/2 en la PUCP (Pontificia Católica Universidad del Perú de Lima en colaboración con la UPM (Universidad Politécnica de Madrid. Los resultados de este ensayo muestran que el SAI con adobe permanece estable sin grietas significativas ante un sismo severo de 130 mm de desplazamiento (equivalente a un sismo de 10º en la escala de Richter.

  17. Edificio Ince - Caracas (Venezuela

    Directory of Open Access Journals (Sweden)

    Sanabria, Tomás José

    1971-08-01

    Full Text Available This project includes a tall building, headquarters of the owning organisation, a four storey block, used for professional training purposes, and an auditorium. In addition there is underground space used as car park, and a small plaza with gardens, meant as an open air exhibition space for sculptures. The structure of the buildings is reinforced concrete, and the curtain walls are of anodizod aluminium.El conjunto comprende: el edificio torre, sede de la Institución; un bloque de cuatro plantas, destinado para centro de formación profesional, y un auditorio. Hay, además, un sótano, que alberga: el estacionamiento de vehículos y zonas de instalaciones diversas, y una plaza tratada paisajísticamente y destinada a exposición permanente de escultura al aire libre. Su estructura es de hormigón armado y los cerramientos son de aluminio anodizado.

  18. Barajas-park. Edificios para industria limpia

    Directory of Open Access Journals (Sweden)

    Argeles, J. Ramón

    1990-12-01

    favor de rotaciones rápidas. El edificio empresarial actualmente se diseña pensando en las interacciones de funciones. La flexibilidad de los espacios traduce un proceso de diversificación económica. Se trata de proyectar edificios que acojan empresas muy diversas con idéntica eficacia. Facilidad de evolución y desarrollo de las empresas, con fáciles modificaciones, optimización de comunicaciones, externas e internas con previsión de aparcamientos. Fácil incorporación de instalaciones, diversas y sofisticadas. Un edificio de estas características ofrece: Buena ubicación. Buena comunicación: Mucha luz natural. Fachadas de calidad arquitectónica. Buen aislamiento. Superficies diáfanas interiores. Capacidad de incorporar instalaciones y servicios sofisticados. Paisajismo y vecindad de calidad.

  19. Bases de diseño de un Nodo Virtual de Procesos.

    Directory of Open Access Journals (Sweden)

    Yoan Martínez Márquez

    2011-01-01

    Full Text Available Normal 0 21 false false false MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Tabla normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman"; mso-ansi-language:#0400; mso-fareast-language:#0400; mso-bidi-language:#0400;} En educación, los contenidos teóricos de las diferentes asignaturas son impartidos en clase pero esto no garantiza que los estudiantes adquieran las habilidades para hacer frente a los problemas reales. Estos contenidos se complementan con laboratorios y actividades prácticas orientados al desarrollo de habilidades prácticas. Desde hace unos años estás habilidades se refuerzan con la creación de laboratorios virtuales de diversa índole donde las nuevas tecnologías se ponen en función de ampliar las capacidades de simulación y prueba en entornos cercanos a la realidad. En este trabajo se aborda el diseño de un Nodo Virtual en el cual se implementan los modelos de distintos procesos, agrupados por tipos que dan la posibilidad de realizar simulaciones con los mismos o probar aplicaciones en tiempo real. Palabras claves: Control Automático, Nodos Virtuales, Procesos Industriales, Simulación.

  20. Caracterización experimental y modelización de una enfriadora de absorción de simple/doble efecto de h2o-libr con accionamiento a dos temperaturas para climatización de edificios

    OpenAIRE

    Figueredo, Gustavo Raúl

    2012-01-01

    Durante la última década se produjo un enorme crecimiento de la implantación de la climatización de edificios, motivada por el aumento de los requerimientos de confort y de productividad de la población, entre otras causas. Los equipos de climatización más difundidos se accionan mediante energía eléctrica, lo que combinado con la gran simultaneidad de la demanda de climatización y su elevado consumo, provocan puntas de demanda de electricidad que sobrecargan las redes y frecuentement...

  1. Edificio, en Tel-Aviv

    Directory of Open Access Journals (Sweden)

    Solotov, Nahum

    1964-03-01

    Full Text Available This building is a clear example of the efforts now being made by the new generations of Israel architects to develop a national architecture, based principally on prefabrication, and running contrary to the classic moulds so deeply rooted in the Middle East, and also to the strong wave of American style modernism. Up to now, this is the tallest building in Tel-Aviv. It consists of vertical pillars at ground level, which branch out into Y shaped supports at the second floor. A large block of apartments rises above these. The outer walls consist of prefabricated concrete parts; there is also a large trellice structure, made up of concrete units, which supports a number of projecting fittings; these provide shade and facilitate ventilation. This type of fittings has proved very useful throughout Israel as a means of solving the basic problem of shade against the sun and suitable ventilation.Constituye un claro exponente de la lucha que sostiene la. nueva generación de arquitectos, formados en Israel, por crear una arquitectura nacional propia—basada principalmente en la prefabricación—, contraria a los moldes clasicistas tan arraigados en el Oriente Medio y a la gran ola de arquitectura americanizante. El edificio, el más alto construido hasta la fecha, en la zona central de Tel-Aviv, arranca en planta baja de unos pilares verticales, que se abren en la planta primera en forma de Y, para sustentar el bloque de apartamentos. Los cerramientos de fachada están construidos con piezas prefabricadas de hormigón; y una gran celosía constituida por bloques de hormigón, a los cuales van adosadas unas piezas salientes que dan sombra y facilitan la ventilación, resolviendo acertadamente este problema fundamental en toda la arquitectura del país.

  2. Seguimiento de la construcción de edificio 43 viviendas Av/ Juan XXIII Valencia

    OpenAIRE

    BURGOS ROMERO, LUIS

    2011-01-01

    Convenios con empresa. La obra prevé la construcción de un edificio de 41 viviendas VP + 2 viviendas libres, constando de 2 plantas sótano para uso de aparcamiento y trasteros, planta baja con local comercial, 8 plantas con 5 viviendas por planta y una planta ático con 3 viviendas. La obra está en su fase de estructura, habiéndose realizado las plantas de sótano. Burgos Romero, L. (2011). Seguimiento de la construcción de edificio 43 viviendas Av/ Juan XXIII Valencia. http://hdl.handle.net...

  3. Edificio del trust Harris y banco Savings

    Directory of Open Access Journals (Sweden)

    Skidmore, Owings y Merrill, Arquitectos Ingenieros

    1963-09-01

    construcción nos ofrece una serie de retranqueos, con los que se consigue una expansión ambiental —tan necesaria en su apretado y apiñado emplazamiento—, que le infunden vitalidad y valorizan el carácter de sus elementos estructurales. En definitiva, podemos decir: esta edificación ha venido a solucionar satisfactoriamente el problema de añadir un nuevo o unos nuevos edificios a otro o a otros existentes, conservando su carácter y, al mismo tiempo, empleando las técnicas más avanzadas. Destaca por sus acertadas proporciones, elegancia y feliz elección de materiales y colores.

  4. Edificio residencial en Montreux – Suiza

    Directory of Open Access Journals (Sweden)

    Jean Serex, S. A., Estudio de arquitectura

    1974-06-01

    Full Text Available This building has been constructed on a beautiful plot next to the lake in the Flower Avenue in Territet. It assumes the shape of a truncated pyramid, with a subterranean floor for installations and garages and 5 apartment stories. Special foundation, structure of reinforced concrete and curtain walls consisting of various prefabricated members. The numerous problems caused by the laws of the area have been studied and solved successfully, as well as the shape of the building and the adaptation to the terrain. Thus an extremely satisfactory result has been obtained in view of the residential requirements.Este edificio ha sido construido sobre un bello solar, junto al lago, en el paseo de las Flores de Territet. Adopta la forma de pirámide truncada, con un sótano para instalaciones y garajes, y cinco plantas de apartamentos. Cimentación especial, estructura de hormigón armado y cerramientos a base de elementos varios prefabricados. Se han estudiado y resuelto acertadamente los múltiples problemas originados por las Ordenanzas de la zona, la forma del edificio y la adaptación al terreno, obteniendo un resultado sumamente satisfactorio a todas las exigencias residenciales previstas.

  5. Edificio de apartamentos en Arbon, Suiza

    Directory of Open Access Journals (Sweden)

    Dubois, G. P.

    1965-09-01

    Full Text Available The building involves a total of 95 flats, of three main types: 64 flats of 4 rooms, 25 flats of 3 rooms, and 6 flats of 2 rooms. There are also secondary facilities, such as garages, which are situated to the east and west of the building, at ground level. This is due to the presence of underground water 1 m below the surface. On the green spaces round the building sports facilities have been provided, such as football and basket-ball pitches, and also playgrounds for children.El edificio alberga un total de 95 apartamentos de tres tipos diferentes: 64 apartamentos de cuatro piezas y media, 25 de tres piezas y media, y 6 apartamentos con dos piezas y media. Una serie de locales secundarios—sótanos y garajes—están situados al E. y al O. del inmueble, edificados sobre el nivel del terreno, por haber encontrado la capa de agua subterránea a 1 m de profundidad. En las zonas verdes que rodean al edificio han sido organizados campos de deportes—fútbol, baloncesto, etc.— y lugares de juegos para los niños.

  6. Edificio Foster Wheeler. Madrid/España

    Directory of Open Access Journals (Sweden)

    Arangüena, José María

    1988-04-01

    Full Text Available This article describes in detail the characteristics of a building in Madrid whose structure, in reinforced concrete, is set into the foundation with individual footings. Services are found in a nucleus made up of a concrete element, designed to stabilize the whole of the structure with respect to horizontal forces. All parts of the building have been designed and constructed in accordance with existing regulations.

    Este artículo describe, con detalle, las características de un edificio construido en Madrid, cuya estructura se tía realizado en hormigón armado y cimentada sobre el suelo mediante zapatas individuales. El núcleo donde se encuentran los servicios es un elemento de hormigón, cuya misión estructural consiste en estabilizar el conjunto de la estructura frente a los esfuerzos horizontales. Todos los elementos del edificio han sido realizados de acuerdo con la Normativa Vigente.

  7. Edificio de apartamentos, Cuba

    Directory of Open Access Journals (Sweden)

    Fernández, Emilio

    1961-07-01

    Full Text Available La obra consta de dos plantas iguales y en cada una de ellas se distribuyen dos apartamentos: uno de tres dormitorios, dos baños., portal, sala, comedor, cocina, patio de servicio y W.C. de servicio; otro, al fondo, con sala-comedor, dos dormitorios, cocina y patio de servicio. Los portales y patios de servicios han sido cerrados casi totalmente por medio de celosías, con objeto de darles un carácter privado y protegerlos de la exposición directa del sol, evitando así los inconvenientes de nuestro clima.

  8. Edificio Playa, en la Costa del Sol

    Directory of Open Access Journals (Sweden)

    Cassinello, Fernando

    1964-02-01

    Full Text Available This apartment block has been built on the Costa del Sol, in Almeria, only a few metres from the seashore. It is meant to provide the following facilities. Changing rooms for bathers, and a night club, in the basement. Restaurant and bar on the ground floor. Twelve living apartments on the six standard floor levels; two apartments per storey. Porter's house in the attic. As the foundations are in the sand, and the building is exposed to strong coastal winds, the structural design has, as interesting features, the foundation ribbed slab and the transversal portal frames, which are W shaped on the ground level. This arrangement makes the edifice look lighter and it acquires a more dynamic plasticity.En la Costa del Sol de Almería y a muy pocos metros de la orilla del mar, se ha construido este edificio de apartamentos. Su programa es el siguiente: casetas de baño y sala de fiestas, en sótano; restaurante-bar, en planta baja; doce viviendas, en las seis plantas tipo, con dos viviendas por planta; y vivienda del portero en ático. Cimentado sobre arena y expuesto a los fuertes vientos que azotan la costa, la solución estructural ofrece el interés de su tipo de cimentación por placa nervada, y de sus pórticos transversales que en planta baja adoptan forma de W, con lo que el edificio adquiere un aspecto de mayor ligereza y de dinamismo plástico.

  9. Metodología para la enseñanza-aprendizaje de la lengua materna como nodo interdisciplinar

    Directory of Open Access Journals (Sweden)

    Carlos Moreira-Carbonell

    2017-11-01

    Full Text Available Se ofrece una metodología para la enseñanza-aprendizaje de la lengua materna como nodo interdisciplinar, a partir de una concepción amplia del texto como “conjunto sígnico coherente”, dotado de códigos de acuerdo con su función comunicativa según la semiótica. Se enfatiza en la utilización del texto más allá del marco de las humanidades. Con ello se potencia el proceso de enseñanza-aprendizaje a partir del trabajo con el texto por ser portador del contenido de aprendizaje, que actúa objetivamente como el objeto que satisface las necesidades de atribución y producción de los significados que necesita el estudiante para poder transformar sus conocimientos.

  10. ¿Entre Roma y Madrid?: la reforma regalista y el Sínodo de Charcas (1771-1773

    Directory of Open Access Journals (Sweden)

    Luque Alcaide, Elisa

    2001-12-01

    Full Text Available En el contexto de las diversas interpretaciones historiográficas sobre la reforma eclesiástica americana del siglo XVIII, el artículo apunta la existencia de una corriente reformista autóctona. El Sínodo de Charcas (1771-1773 fue una iniciativa americana: lo convocó un obispo criollo antes de recibir el Tomo regio de Carlos III que pondría en marcha los concilios provinciales regalistas en América. El trabajo indaga las directrices reformistas del Sínodo en los decretos sobre párrocos y doctrineros. El estudio de la fuentes de esos decretos pone de relieve la recepción de los escritos de Benedicto XIV que, desde Roma, impulsó durante su pontificado (1740-1758 un movimiento de renovación cristiana. Los datos recogidos llevan a sostener que en el siglo XVIII existieron en América dos proyectos de reforma eclesiástica: uno regalista fraguado en Madrid y otro eclesial autóctono, en sintonía con las iniciativas de Roma y en continuidad con los concilios americanos de los siglos XVI y XVII.

  11. Edificio Discount Bank - Ginebra – Suiza

    Directory of Open Access Journals (Sweden)

    Braillard, P.

    1973-09-01

    Full Text Available This building stands in the very centre of Geneva, and is made up of: — two basements, where the different types of mechanical and electrical installations are to be found; — a ground floor, with a hall for the public, ticket office and cash safes; — six floors of offices, with management and lecture rooms; — an attic, with terrace, which is where the staff dining room and cafeteria is located. Construction made of reinforced concrete slabs, resting on walls also made of concrete or on steel and concrete pillars. The frontage, from the pavement to the metal and glass awning which surrounds the building, has a granite coating. The upper part is made of large monolithic squares of artificial stone with double glass panels. The attic is completely glazed. Marble, stone, linoleum and carpeted floors, according to the use and function of the premises. The building is fully equipped with: two lifts, two document lifts, pneumatic mail, alarm system, automatic fire-extinction installation and air conditioning and ventilation installations, telephone, electric and lighting systems.En el mismo centro de Ginebra se levanta este edificio, que consta de: — dos sótanos, en los que se distribuyen los diferentes tipos de instalaciones mecánicas y eléctricas; — una planta baja, con el hall de público, taquillas y cajas de caudales; — seis plantas de oficinas, con dirección y salas de conferencias; — un ático, con terraza, en el que se encuentran el comedor y la cafetería para el personal. Construcción a base de losas de hormigón armado, apoyadas sobre muros también de hormigón o en pilares de acero y hormigón. La fachada, desde la acera hasta la marquesina de metal y vidrio que rodea el edificio, lleva revestimiento de granito. La zona superior es de grandes cuadros monolíticos de piedra artificial con entrepaños de vidrio doble. El ático está completamente acristalado. Suelos de mármol, gres, linóleo y moqueta, según el uso y

  12. Edificio para oficinas de Assicurazioni Generali

    Directory of Open Access Journals (Sweden)

    Alas, Genaro

    1964-02-01

    Full Text Available This building is on the Generalisimo Avenue, in Madrid. It is an office block made up of two wings and a central nucleus for vertical communications. The two bay floor levels have been planned to achieve the utmost flexibility in distribution, since there is no precise preconceived program of floor space distribution and future developments. The project is based on a 1.20 x 1.50 m modulus, which has been arrived at after detailed study. It has been obtained from a minimum space working unit, i. e., the surface that an employee will need. Each bay comprises nine 1.20 m modular units, and each floor level contains four service units, including ladies' and gentlemen's room and a cleaner's cubicle, fitted with waste disposal device. The building structure is reinforced concrete. The main facade has a striped steel facing, roll up aluminium Venetian blinds, with controllable elements, which provide good solar protection. This is a beautiful and well-coordinated building, which is worth a detailed study.Está situado en la avenida del Generalísimo en Madrid. Es un edificio destinado a oficinas, con dos cuerpos de doble crujía y un núcleo central de comunicaciones verticales. Las plantas han sido proyectadas pensando, siempre, en obtener la máxima flexibilidad, ya que, por no existir un programa enteramente definido, interesaba permitieran diferentes distribuciones y aprovechamientos futuros. El módulo de 1,20x1,50 m, base del proyecto, ha sido el resultado de un estudio detenido, partiendo de que la unidad mínima de trabajo está constituida por la superficie que ocupa un empleado. Cada crujía comprende nueve módulos de 1,20 m; y en cada piso se han organizado cuatro unidades de servicio, compuestas por un aseo de caballeros, uno de señoras y un cuarto de limpieza con vertedero. Su estructura es de hormigón armado, y en fachada principal aparece revestida con chapa, de acero banderizado, y antepechos corridos, de piedra Colmenar; persianas

  13. Edificio de 14 viviendas y garajes en Cartagena

    OpenAIRE

    Navarro Serrano, Antonio

    2015-01-01

    Se trata de la construcción de un bloque de viviendas con forma de “U” donde en este proyecto se ocupara de realizar uno de los tres bloque del mismo. Este bloque engloba la construcción de 14 viviendas con aparcamiento y trasteros, ubicado en la ciudad de Cartagena. El edificio proyectado corresponde a la tipología de vivienda plurifamiliar en bloque en “U” (manzana abierta). Constará de una planta sótano común para todo el bloque, cuatro plantas de viviendas y una de trastero...

  14. Edificio industrial, en Madrid

    Directory of Open Access Journals (Sweden)

    Lamela, Antonio

    1964-10-01

    Full Text Available This building can be separated into four main units. One includes the administrative offices, stores and design office. The second comprises the general workshops. The third is occupied with general services and a garage; and the fourth is taken up with two flats for the doorman and watchman. In the first one space is provided for the management, the assistant manager, the draughtsmen’s hall, the stores and auxiliary dependencies. The bookkeeping department is connected with the stores, for finished goods, and with the cashier's offices. There are separate washrooms for the management, the staff and the workmen. The workshop has been constructed on the modular system, and maximum illumination has been sought. The design allows for possible rearrangements and enlargements in the general layout. The third unit includes a transformer room, a storage accumulator, heating station, garage and workshop, and a store for buthane gas containers. The two dwellings are quite independent, and the daytime and nighttime living quarters are carefully separated. The structure and materials are clearly evident. No artifice is attempted, and the architect has been successful in making the most of the aesthetic and plastic qualities of the materials employed.Podemos distinguir en este complejo industrial cuatro unidades arquitectónicas: Cuerpo de dirección, administración, proyectos y almacenes; cuerpo de talleres; servicios y garajes; dos viviendas para conserjes o vigilantes. En el cuerpo de dirección se agrupan, por un lado, la dirección propiamente dicha; por otro lado, la subdirección en conexión directa con la sala de proyectos y delineación, y en el centro están los almacenes y contramaestres. La zona de contabilidad aparece en conexión con el almacén de productos terminados y en relación con la zona de pagos, a través de caja. Los servicios sanitarios se dividen en tres grupos: aseos para dirección, empleados y obreros. En el cuerpo de

  15. Diseño de la instalación de climatización y agua caliente de un edificio residencial con bomba de calor aire-agua y energía solar térmica y fotovoltaica

    OpenAIRE

    Jiménez López, Laura

    2010-01-01

    El proyecto que a continuación se relata tiene objetivo evaluar y calificar energéticamente una vivienda basada en un sistema energético todo eléctrico. La tecnología de climatización y producción de Agua caliente utilizada será la Bomba de Calor aire-agua. Se incorporará la aportación de energía solar térmica y energía fotovoltaica. La realización del proyecto contará con la integración de ambas tecnologías en el edificio estudiado. El sistema de climatización y producción de Agua c...

  16. Una mirada al Concilio: Desde la recepción de su antropología en los sínodos de Temuco

    Directory of Open Access Journals (Sweden)

    Tibaldo Zolezzi C

    2011-01-01

    Full Text Available Este artículo intenta una mirada crítica al Concilio Vaticano II, desde la recepción de su enseñanza antropológica en la reflexión teológico-pastoral de los sínodos de la Diócesis de Temuco. Estos sínodos, celebrados en épocas distintas, y urgidos por diversas situaciones sociales y eclesiales, manifiestan propias acentuaciones, a veces hasta contradictorias, en la comprensión de la antropología conciliar. Es posible postular que estas propias acentuaciones tienen que ver en mucho con lo poco conclusa de la antropología del Vaticano II. De hecho los sínodos en cuestión beben de su riqueza, pero también reflejan sus vacíos y debilidades. Sin embargo, estos mismos sínodos son también testigos de que el Concilio sembró perspectivas novedosas y prometedoras, que, si son reconocidas y profundizadas, pueden contribuir a despejar muchas de las incertidumbres de nuestra época.This articles attempts to take a critical look at II Vatican Council from the reception of its anthropological teaching in the pastoral-theological consideration of the synods of the diocese of Temuco. These synods, which were held in different times and were driven by varying social and ecclesial situations, express their own approaches to the understanding of council anthropology which sometimes contradict one another. It is possible to state that these inconclusive approaches relate to the ambiguity of II Vatican anthropology. In fact, the synods nourish from its richness but they also reflect its weaknesses and shortcomings. However, these same synods are testimony of the novel and promising perspectives that the Council planted which, if they are recognized and deepened, can contribute to clarify many of the uncertainties of our time.

  17. Edificio de archivos en Los Angeles

    Directory of Open Access Journals (Sweden)

    Neutra & Alexander, Arquitectos

    1963-07-01

    Full Text Available The 80th birthday of Richard Neutra coincides with the completion of this building, a special feature of which is that it has 13 half-floor levels, thus saving space and making it easier to reach the documents. Besides housing the Territorial Archives Office, it accommodates the Territorial Testing Dept., Regional Planning Committee and Territorial Library. 40 ms high rotary sun shields are fitted, made of aluminium. They are controlled automatically by electronic devices, motivated by the solar action, and are thus correctly orientated at any time to provide protection against sun glare. They close altogether when the wind speed is such that they might be damaged. On the main facade looking towards Temple Street, the plastic arts organisation has contributed a large mosaic by Joseph Young, showing a map of the district. This archives building in Los Angeles is a fine exponent of what technology can do for man, and it is a characteristic example of contemporary organic architecture at its best.El principio de la octava década de Neutra coincide con la terminación del edificio, cuya sección nos ofrece trece medias plantas, para economizar espacio y facilitar el alcance de los documentos. Aloja, además de la Oficina Territorial de Archivos, otras varias: Departamento Territorial de Pruebas, Comisión de Planificación Regional y Biblioteca Territorial. Unos «brise-soleils» giratorios, de aluminio, de 40 m de altura, que funcionan automáticamente —controlados por un cerebro electrónico— bajo la acción solar, proporcionan la orientación «adecuada» en cada momento y protegen del brillo lateral, cerrándose cuando el viento sopla con una velocidad que puede serles perjudicial. Como aportación de las Artes Plásticas aparece en la fachada principal, que da a la calle Temple, un gran mosaico, de Joseph Young, del mapa del territorio. Este edificio de archivos en Los Angeles constituye un claro exponente en el que la, técnica est

  18. Edificio administrativo de Ciba-Geigy Basilea – Suiza

    Directory of Open Access Journals (Sweden)

    Burckhardt, Martin H.

    1975-10-01

    Full Text Available This building consists of two identical blocks —with four storeys above ground and a basement— connected by a third body in which the main entrance of the complex is located. The two first mentioned units have rectangular platform and contain: basement with technical installations; ground floor with a restaurant and a kitchen for the staff, service rooms and an air raid shelter; and on the three upper floors the offices are located which are reached by means of the connecting body. The offices are planned as office-landscapes thus forming a single space that occupies the entire floor. The working places have been placed in the periphery and in the centre the auxiliary rooms. The complex is completed by a three level parking place, situated on the other side of the approach road and joined directly to the building entrance by means of a subterranean passage.Este edificio está constituido por dos bloques idénticos, de cuatro alturas y sótano, enlazados por un tercer cuerpo en el que figura la entrada principal del edificio. Los primeros, de planta rectangular, tienen: sótano, con locales técnicos; planta baja, con restaurante y cocina para el personal, locales de servicio y un refugio para defensa antiaérea; y, en las tres plantas superiores, las oficinas, a las que se llega a través del cuerpo de enlace. Las oficinas son del tipo oficina-paisaje, formadas por un espacio único que ocupa toda la planta. Se han organizado colocando los puestos de trabajo en la periferia; y en la parte central, el grupo de locales auxiliares. El conjunto se completa con un aparcamiento, en tres niveles, situado al otro lado de la calle de acceso, y unido directamente a la entrada del edificio mediante un paso subterráneo.

  19. Procter & gamble, Edificio Administrativo - Schwalbach. Alemania Federal

    Directory of Open Access Journals (Sweden)

    Hentrich-Petschnigg & Partner, Arquitectos

    1974-03-01

    Full Text Available This elegant building was constructed on a large lot with a beautiful panoramic view near the city of Frankfurt. In consists of a basement, a large ground floor with reception and social facilities such as lounges, lobbies, coffee shops, etc.; seven-story star-block with vertical circulations and the laboratories are in the center. The building is basically used for offices. In a separate rectangular body, the service and boiler facilities are located. A spacious garden and parking area fill out the rest of the grounds. The possibility of quadrupling the current built volume is anticipated. The stories have been distributed with a basic 1.50 x 1.50 m module. Construction based on: metallic structure, concrete casting on metallic frames, red granite-covered concrete enclosures, double glazed glass, indoor vertical sunshades, carpeted floors and air conditioning.Próximo a Frankfort, sobre un gran solar de bellas panorámicas, se ha levantado este elegante edificio, que consta de: sótano, una extensa planta baja de carácter representativo y social (salones, vestíbulo, cafetería, etc.; bloque en estrella, de seis plantas, con las circulaciones verticales y los aseos en el centro, destinado, fundamentalmente, a oficinas. En un cuerpo rectangular separado se disponen las instalaciones y calderas. Un espacioso jardín y la zona de aparcamientos completan la ocupación del terreno, en el cual está prevista la posibilidad de cuadruplicar el volumen actualmente edificado. Las plantas se han distribuido con un módulo básico de 1,50 x X 1,50 m. Construcción fundamental, a base de: estructura metálica, forjados de hormigón sobre encofrados metálicos, cerramientos de hormigón revestido de granito rojo, cristales dobles, parasoles interiores verticales, suelos enmoquetados y aire acondicionado.

  20. Arquitectura modernista en Palma de Mallorca : el edificio Forteza Rey

    Directory of Open Access Journals (Sweden)

    María José Galván Mostazo

    1989-01-01

    Full Text Available El edificio Forteza Rey es un fiel exponente de la arquitectura urbana burguesa de comienzos de siglo. Por su dinámica espacial y por su sintaxis decorativa puede englobarse bajo el denominado «modernismo». Tanto la riqueza iconográfica que presenta como su peculiar proceso de construcción, donde aparecen las figuras de artista aún sin estudiar (José Forteza Rey, su hijo Luis, José Alomar otorgan a este edificio un interés especial. Ubicada en el centro urbano de Palma de Mallorca, la Casa Rey está construida sobre un área aproximada de 130 m^ con un desarrollo a partir del nivel de calle de seis plantas más dos secciones subterráneas. Cada planta tiene una distribución espacial similar, acorde con las necesidades de sus ocupantes, aunque en todos los pisos coinciden la disposición de servicios (cocina, baños, despensas, cuarto de servicio, etcétera.

  1. Instalaciones eléctricas en edificios de viviendas. Proyecto de un edificio.

    OpenAIRE

    Sánchez Rodríguez, Juan Manuel; Cárcel Carrasco, Francisco Javier

    2015-01-01

    Sánchez Rodríguez, JM.; Cárcel Carrasco, FJ. (2015). Instalaciones eléctricas en edificios de viviendas. Proyecto de un edificio. Area de Innovación y Desarrollo S.L. http://hdl.handle.net/10251/83665 Senia

  2. Edificio Rosental, en Basilea, Suiza

    Directory of Open Access Journals (Sweden)

    Suter & Suter, Arquitectos

    1966-11-01

    Full Text Available The new exposition building for the Swiss Samples Fair contains two basements, a ground-floor, a gallery and two pper-floors. The technical equipment and the stores are kept in the bottom basement, whilst the first basement serves for exhibition purposes. The ground floor is devoted to all exposition possibilities, but especially for heavy and big machinery. Beside of special expositions, restaurant facilities are foressen on the gallery-floor. The two upper-floors are devoted to conventional types of expositions. Since the building should be erected in the very short time of nine months, the construction has been done with precast reinforced concrete units.El nuevo edificio para exposiciones construido en el recinto de la Feria de Muestras de Basilea, consta de: dos sótanos, planta baja, entreplanta y dos plantas de altura. El segundo sótano contiene los almacenes; el primer sótano está destinado a exposición de mercancías; la planta baja, a exhibición de mercancías y maquinaria pesada; la entreplanta, a exposiciones especiales; y las otras dos plantas, a exposiciones normales. La construcción ha sido realizada a base de elementos prefabricados de hormigón armado.

  3. Edificio de Oficinas en Viena – Austria

    Directory of Open Access Journals (Sweden)

    Lippert, Georg

    1979-05-01

    Full Text Available The main offices of Austrian Airlines are located in the outskirts of Vienna. in a large lot, 32,700 m2 in area, of which 13,000 m2 are occupied by the building, while the remaining surface are yards and landscaping. The building consists of four stories above ground and an ample basement for car park and services. The aboveground floors are distributed into numerous offices and rooms, plus a restaurant and coffee shop for guests and mess all for 800 employees and a kitchen. Outstanding in the architectural design is a 32 m-high tower conceived as a distinct element, symbolizing and suggesting from faraway the nature of the company's activities.

    Las oficinas centrales de la Austrian Airlines están emplazadas en las proximidades de Viena, en una amplia parcela de 32.700 m2, de los que la construcción ocupa 13.000, destinados los restantes a Jardines y explanadas. El edificio consta de cuatro plantas de altura máxima y un amplio sótano destinado a servicios y aparcamientos. En las plantas superiores se distribuyen numerosos despachos y oficinas, restaurante y cafetería para clientes, y comedor, con cocina, para una plantilla de 800 empleados. En el planteamiento arquitectónico destaca una torre de 32 m de altura, concebida como elemento distintivo capaz de sugerir, a distancia, la naturaleza de la actividad de la compañía.

  4. Una propuesta para la arquitectura informática del sistema de control de un edificio

    Directory of Open Access Journals (Sweden)

    Triviño Barros, Gracián

    2004-12-01

    Full Text Available Nowadays, in order to perform the optimal installations automatic control, buildings structure incorporates a new kind of computers which are different from the desk computers dedicated to user’s personal tasks.These computers spread in the form of a network that is overlapped with the building structure in such a way that soon we shall speak about the computer omnipresence in the building.The building control system is considered in this paper as an intelligent agent. This means a control system provided with sensors and actuators to interact with its environment. This control system must develop its activity in order to get autonomously the programmed goals. A generic control building architecture is presented as a step towards the systematic development of control building systems.A project for the development of a software tool is also presented. This tool intends to support and make easy the programming of such kind of control systems. This project is been developed in the Department of Photonic Technology at Universidad Politécnica of Madrid.La necesidad de realizar un control automático óptimo de las instalaciones de un edificio ha provocado que un nuevo tipo de ordenadores, diferentes de los ordenadores de sobremesa que utilizan personalmente los habitantes del edificio, entren a formar parte de la arquitectura del propio edificio.Estos ordenadores se van extendiendo en forma de una red imbricada con la propia estructura del edificio de tal manera que pronto podremos hablar de la omnipresencia del ordenador en el edificio.En este trabajo se plantea el sistema de control del edificio como un agente inteligente, como un sistema que dotado de sensores para percibir su entorno, y de medios de actuación para modificarlo, realiza permanentemente ciertas operaciones de procesamiento de información y acciones sobre el propio edificio persiguiendo de manera autónoma alcanzar los objetivos para los que ha sido diseñado.Como un paso

  5. Estudio geotécnicos en suelos gravosos. Aplicación : edificio de 7 pisos y 2 sótanos

    OpenAIRE

    Velásquez Paredes, Víctor Martín; Velásquez Paredes, Víctor Martín; Velásquez Paredes, Víctor Martín

    2015-01-01

    El presente Informe de Suficiencia corresponde al proyecto inmobiliario "Edificio lnclán 673" de Vivienda Multifamiliar en el distrito de Miraflores y desarrolla los Aspectos Geotécnicos para el análisis y diseño de cimentaciones. El proyecto del conjunto residencial prevé la construcción de edificio de 7 pisos con 2 sótanos y está ubicado en la calle Coronel lnclán 673 en el Distrito de Miraflores, Provincia y Departamento de Lima. La parte estructural del edificio está en que es una s...

  6. Edificio de viviendas, en Madrid

    Directory of Open Access Journals (Sweden)

    Azpiazu Ordóñez, José Ramón

    1965-12-01

    Full Text Available This building has a basement, four storeys and an attic. In the basement there is a private garage, air conditioning equipment, fuel and refuse stores, and private lockers for the various apartments. The ground floor has two dwellings and the open entrance, where there is a receptionist's desk and the post boxes. The other floors have two dwellings, each of 220 m2 area, and another of 440 m2. The attic has two small outbuildings, each of them containing a large room, or studio. This building has been lavishly designed, and space distribution is carefully planned. The interplay of volumes, and charming overall design give this project a distinctive and attractive quality.Consta de sótano, planta baja, tres plantas de pisos y ático. La planta de sótano aloja: el garaje particular de la casa, las instalaciones de aire acondicionado, almacén de carburantes, almacén de basuras y trasteros para cada vivienda o estudio. La planta baja comprende: dos viviendas y el zaguán, en el cual hay un mostrador para la conserjería y los casilleros postales. La planta tipo consta de dos viviendas: una de 220 m2 y otra de 440 m2. Y, finalmente, la planta de ático se compone de dos torreones destinados a estudios. El edificio es de una gran riqueza de tratamiento y espacio, cual corresponde a viviendas nobles. La distribución acertada y la graciosa y movida composición volumétrica le imprimen un sello característico y distintivo.

  7. Edificio Mitre, en Barcelona, España

    Directory of Open Access Journals (Sweden)

    Barba Corsini, F. J.

    1969-10-01

    Full Text Available This project consists of seven blocks, each 12 storeys high. They have a common set of services, including central heating, parking, domestic aids, washing installations, snack bar, a pharmacy and a children's nursery. The ground floor of each block has shops, the main and the service vestibules, n porter's room, storage for parambulators, and refuse storage space. The first floor of each block is devoted to apartments, and the rest of the floors to flats. The project is so well planned and so constructed that it can be cited as an example of small sized flats organised in a large set of blocks.El edificio está formado por siete unidades o casas de 12 plantas, con servicios comunes a todas ellas: central de calor; aparcamiento; auxiliaría doméstica; lavandería; snack-bar; farmacia y guardería. La planta baja de cada unidad aloja: las tiendas; los vestíbulos —principal y de servicio—; portería; cuartos para coches-niños; cuarto de basuras; etc. La planta 1. está destinada a apartamentos, y las restantes se dedican a viviendas. El acierto logrado en su diseño determina el que pueda presentarse este edificio como ejemplo de realización destinada a viviendas pequeñas.

  8. Edificio de seguros, en Tokio, Japón

    Directory of Open Access Journals (Sweden)

    Komuten Co. Ltd., Takenaka

    1969-03-01

    Full Text Available This building has been erected by the Daiichi Mutual Life Insurance Co., and involves a tall tower with offices, which is the core of the project; another building accommodating the dining hall, as well as 40 one family dwelling; a further 22 houses also devoted to dwellings, each containing 18 family flats; a building of 8 storeys with rooms for single men; and a sports and recreation zone, with a club, a football ground, swimming pool and tennis courts. The office tower has basements, and 18 storeys. Below ground there are stores, machine room, and a control room for the building's installations. Floors 1st to 4th have a reception zone, data section, first aid facility, and lecture rooms. Floors 5 to 18 are devoted to offices, management rooms, and other lecture halls. The builidngs are fitted with all modem technical facilities.Comprende el conjunto construido por la Daiichi Mutual Life Insurance Company: el edificio de oficinas, ubicado en una torre que constituye el corazón del complejo; una edificación destinada a salón-comedor; 40 viviendas unifamiliares; 22 edificaciones dedicadas a vivienda, con 18 apartamentos familiares cada una; una unidad de 8 plantas de altura, con habitaciones para solteros; y la zona deportiva-recreativa, con una serie de instalaciones: club, campo de fútbol, piscina, pistas de tenis, etc. La torre de oficinas, que consta de sótanos y 18 plantas de altura, alberga en sus 2 plantas de sótanos: los almacenes, salas de máquinas, salas de control para los servicios del edificio, etc.; en las plantas 1.ª a 4.ª se distribuyen: la zona de recepción, centro de elaboración de datos, dispensario, sala de conferencias, etc.; y las plantas 5.ª a 18.ª contienen: las oficinas, dirección, secciones ejecutivas, salas de conferencias, etc. El edificio está dotado de todos los adelantos técnicos que proporciona el momento actual.

  9. Evaluación de la demanda sísmica fuera del plano en edificios

    Directory of Open Access Journals (Sweden)

    Wilmer Julián Carrillo León

    2005-01-01

    Full Text Available En este trabajo se presentan los resultados de una investigación analítica y computacional, donde se propone una metodología para evaluar la demanda sísmica fuera del plano, en edificaciones de pórticos con rellenos de mampostería no reforzada. Con esta metodología se obtienen los registros de aceleración en diferentes alturas del edificio. Las ecuaciones propuestas se basan en los resultados obtenidos mediante metodologías establecidas a nivel mundial, datos registrados de una edificación construida en la ciudad de los Ángeles, la cual se encontraba completamente instrumentada durante el sismo de Northrigde – 1994; y modelos analíticos de edificios típicos analizados mediante el método de elementos finitos - FEM. Por último, se presentan curvas de aceleración respecto a la altura (utilizando la metodología propuesta para edificios típicos con sistema estructural de pórticos con mampostería no reforzada construidos para las diferentes zonas establecidas en la microzonificación sísmica de la ciudad de Bogotá

  10. Edificio en la Universidad de Liverpool

    Directory of Open Access Journals (Sweden)

    Bryan & Norman Westwood & Partners, Arquitectos

    1964-09-01

    conferencias; las últimas plantas están divididas en habitaciones pequeñas. El ático lo ocupa el decano. El ala destinada a Oceanografía, de una sola planta, con laboratorios, conecta la. parte frontal y posterior del conjunto. El bloque con fachada a Bedford Street, que tiene dos plantas, está dedicada al cálculo numérico y estático, excepto una serie de dependencias anexas y en conexión con el ala de Oceanografía. La comunicación entre las diversas alas se realiza al nivel de la planta baja. Los edificios que integran este complejo universitario constituyen un conjunto orgánico, que destaca por su buen funcionamiento y adecuada ambientación, tanto interior como exterior.

  11. 2 Obras de A. Lamela: Edificios Sol y La Caleta en Palma de Mallorca

    Directory of Open Access Journals (Sweden)

    Lamela, A.

    1967-11-01

    Full Text Available 2 Buildings designed by A. Lamela Sol Building This is a commercial and apartments block, and has a basement, ground floor, and ten stories above it. On each of the top ten stories there are twelve apartments. The design of this building is highly influenced by the gardening that surrounds it. La Caleta Building This is another commercial and apartments building, consisting of a lower block, part of which is covered with a terrace, gardens and a swimming pool, and a higher block. The apartments are all similarly designed, and only vary in the number of bedrooms. The design is especially «clean», simple and up to date.Edificio SOL - Proyectado en 1960, Terminado en 1983 Destinado a edificio de apartamentos y comercial, consta de: planta de sótano, baja, primera y nueve plantas tipo. Los apartamentos están localizados en la primera planta y las plantas tipo, en número de doce por planta. En el desarrollo de este proyecto, la jardinería ha jugado un papel muy importante. Edificio La Caleta - Proyectado en 1961.Terminado en 1964. Este edificio de apartamentos y locales comerciales, consta: de un volumen «inferior» cubierto por una terraza ajardinada con piscina, y de un bloque «superior» Los programas de cada uno de los apartamentos son similares, variando únicamente el número de sus dormitorios. El conjunto construido se distingue por su arquitectura limpia, simple y actual.

  12. ANÁLISIS DE LOS SECRETOS COMPARTIDOS PARA LA AUTENTICACIÓN DE NODOS EN LAS WIRELESS SENSOR NETWORKS MEDIANTE EL ALGORITMO DE SHAMIR

    Directory of Open Access Journals (Sweden)

    Miguel Alfredo Acedo Arias

    2008-01-01

    Full Text Available Una nueva generación de redes está naciendo a partir de la evolución de dispositivos móviles de comunicación y de la convergencia de las diferentes tecnologías de redes en Internet. Estas son las denominadas redes Ad hoc, cuyas características imponen retos en el enrutamiento, administración eficiente de energía, seguridad, aplicaciones y estandarización. Las WSN (Wireless Sensor Network son una clase especial de redes Ad hoc, en las que se manejan poblaciones numerosas de dispositivos sensores, describiendo topologías en malla dinámicas. Estas redes igual que Internet son objeto de múltiples ataques de suplantación de identidad realizados por usuarios maliciosos que persiguen objetivos diversos. En este artículo se presenta un protocolo de autenticación de nodos basado en el esquema de secretos compartidos de Shamir para una red de WSN con una población alta de nodos.

  13. Aeropuerto internacional de Los Angeles: Edificio "Theme"

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1961-10-01

    Full Text Available Recientemente, se ha terminado un nuevo edificio en el aeropuerto de Los Angeles, que constituye una estación aérea, moderna por su forma y servicios de que está dotada, en la que se ha dado cabida a todas las necesidades actuales que el servicio de aeronaves reactores requiere.

  14. Edificio para oficinas en Hartford, Estados Unidos

    Directory of Open Access Journals (Sweden)

    Sherwood, Mills y Smith, Arquitectos

    1961-05-01

    Full Text Available Este edificio ha obtenido el primer premio del Instituto Americano de Arquitectos, en 1960, y el Certificado de Mérito para un proyecto destacado, en 1959, de la Asociación de Arquitectos de Nueva York.

  15. Edificio Municipal, en Glendale, (U.S.A.

    Directory of Open Access Journals (Sweden)

    Martin, Albert C.

    1968-05-01

    Full Text Available This building has a basement, a diaphanous ground floor, and three storeys, which are occupied by various municipal departments, such as housing, security, engineering, planning, urbanism, and general management. The structure is highly original and functional, and these features make it a building of singular and striking appearance.Consta de: sótano; planta baja, proyectada con una gran diafanidad; y tres plantas de altura, que alojan los diversos departamentos de: Edificación, Seguridad, Ingeniería, Planificación, Zonifícación. Administración, etc., del Ayuntamiento de Glendale. La originalidad de su estructura, y su eminente funcionalidad, son características específicas de este edificio singular y de gran prestancia arquitectónica.

  16. Edificio administrativo para la IBM de Alemania - Hannover (Alemania Federal

    Directory of Open Access Journals (Sweden)

    Oesterlein, D.

    1973-03-01

    Full Text Available This building is made up of three stepped bodies, both in plant and elevation view: — one for computation, — the second for training, and — another middle one which joins them, and through which the former can be entered. At the height of the first floor, a passable canopy provides the building with acoustic and light protection. The building is made with reinforced concrete with opaque window panes in aluminium frames. The computations centre, as such, is on street level, enabling passers-by to see inside. The training section is made up of three floors. Every eight pupils form a group, using two television screens, also having contact with the instructor by means of intercoms. There are two car parks at the back of the building: one on street level for 45 vehicles, and another for 70 in the basement. The whole building has high and lowpressure air conditioning. There are four lifts and a special internal transport system for documents. The mesh of the roof, enables the inner walls to be moved.Este edificio consta de tres cuerpos escalonados, tanto en planta como en alzado: uno, de cálculo; un segundo, para enseñanza, y otro intermedio, que une y da entrada a los anteriores. A la altura de la primera planta un voladizo transitable da protección acústica y luminosa al edificio. La construcción es de hormigón armado, con cristaleras opacas sobre marcos de aluminio. El centro de cálculo, propiamente dicho, está situado a la altura de la calle, permitiendo a los transeúntes observar el interior. La sección de enseñanza consta de tres plantas. Cada ocho alumnos forman un grupo, que utiliza dos pantallas de televisión, manteniendo contacto además con el instructor mediante interfonos.

  17. Edificio de oficinas en Haaga - Helsinki – Finlandia

    Directory of Open Access Journals (Sweden)

    Heikki Castrén y Cía., Arquitectos

    1974-05-01

    Full Text Available This building has been constructed to house the head office of the company. It occupies eleven floors above ground and three subterranean ones, in addition to the lift shafts and its machinery tower. Since the lowest level is situated lower than and very close to the sea level a retaining wall has been constructed that is separated from the building by an inspection corridor which in addition isolates it from the possible humidity. Total foundation on the rock; beams and double pillars that allow pipes to be placed inside; mobile layout of partitions, aluminum windows with isolating glass; various airconditioning installations; pneumatic communications, etc. In addition to the premises for which it is actually intended it includes a spacious auditorium, a staff dining room, and a gymnasium with swimmingpool.Este edificio ha sido construido para albergar la sede central de la compañía. Se distribuye en once plantas sobre la rasante y tres subterráneas, además del foso de ascensores y la torre de maquinaria de los mismos. Dado que el nivel inferior se encuentra más bajo que el del mar y muy próximo a éste, se ha creado un muro de contención separado del edificio por un corredor de inspección que, además, lo aísla de las humedades posibles. Cimentación total sobre roca; estructura de hormigón armado; vigas y pilares dobles, que permiten el paso de conductos por su interior; tabiquería móvil; ventanas de aluminio con cristal aislante; toda suerte de instalaciones de acondicionamiento, comunicaciones neumáticas, etc. Además de las dependencias propias del uso a que se destinan, comprende un amplio auditorio, comedor de empleados y gimnasio con piscina.

  18. Rehabilitación y reforma estructural de edificios antiguos

    Directory of Open Access Journals (Sweden)

    Buzón, Rafael

    1982-03-01

    Full Text Available Not available.Las Ordenanzas Municipales de la mayor parte de las ciudades exigen que se respeten las edificaciones con cierto carácter tradicional o histórico, rehabilitándolas o reconstruyéndolas, con la obligación de conservar íntegramente las fachadas en su mismo aspecto arquitectónico. Un porcentaje importante del volumen futuro de construcción estará dirigido a estos edificios. Barrios enteros edificados en una misma época con características constructivas similares, se encuentran en igual grado de deterioro o envejecimiento por el transcurso de los años, con un estado resistente precario, precisando de una pronta rehabilitación, si se quiere evitar el desalojo masivo y la pérdida irreversible de los inmuebles. Se hace preciso conocer la técnica utilizada, el comportamiento de los materiales, los daños más frecuentes, por vicio o envejecimiento y la práctica de reparación eficaz para abordar este campo olvidado de la construcción.

  19. Influencia del tipo de hormigón y de acero, y de las características geométricas de la estructura, en los costes de materiales y en la superficie ocupada por los pilares en estructuras de edificios de hormigón armado con forjado unidireccional

    Directory of Open Access Journals (Sweden)

    Gómez Hermoso, J.

    1999-12-01

    Full Text Available The project and construction experience of building structures permit to affirm that greatest part of this structures usually are concrete frames with one way slab. This is the reason to develop this systematic study about the influence that concrete and steel used have in this structures. The aim is to give some criteria to geometric structure definition and the materials choice. We have calculated 80 structure buildings modified the height (small, intermediate and tall, with 5,12 and 20 tipical flats over ground, respectively, the concrete class (HI 75, H200, H250, H300, H400 y H500, the steel types (AEH400 and AEH500, the distance between columns (short and long, 5,00 and 6,00 m, respectively and the slab depth (24. 26 and 29 cm. When the calculation results were obtained (as shown on a set of tables and graphs, we made an analysis of materials cost (concrete and steel and the surface occupied for the columns.

    La experiencia en el proyecto y ejecución de estructuras de edificación permite afirmar que, en un porcentaje muy elevado de ocasiones, se encuentran constituidas por pórticos de hormigón armado y forjados unidireccionales. Este hecho ha sido la causa fundamental que ha motivado el desarrollo de este estudio sistemático sobre la influencia que en estas estructuras puede tener el tipo de hormigón y acero utilizados, persiguiendo como objetivo final facilitar unos criterios para la definición geométrica de la estructura y la elección de materiales. Se ha procedido al cálculo de 80 edificios clasificados en función de la altura (bajo, medio y alto, con 5, 12 y 20 plantas tipo sobre rasante, respectivamente, el tipo de hormigón (H175, H200, H250, H300, H400 y H500, el tipo de acero (AEH400 y AEH500, la luz entre pilares (corta y larga, con 5,00 y 6,00 m, respectivamente y el canto del forjado (24, 26 y 29 cm, siendo la viga plana. Tras la obtención de los resultados (presentados en una serie de tablas y gráficos, se

  20. Un estudio sobre el mejoramiento del inventario de edificios sociales con énfasis en la rehabilitación de fachadas A study towards improving of social housing stock with a focus on facade renewal

    Directory of Open Access Journals (Sweden)

    Fernanda Flach

    2008-01-01

    Full Text Available Una parte del stock de habitación social en Brasil tiene problemas de conservación. La depreciación de las construcciones, especialmente en el caso de grandes conjuntos habitacionales, provoca la pérdida de calidad del entorno, con importantes consecuencias sociales y económicas para sus moradores y hasta para la región donde están ubicados. La rehabilitación predial es una acción importante para recuperar la calidad de vida. El aumento de la vida útil de las edificaciones también suele crear una reducción en la generación de basuras de construcción y demolición. Uno de los aspectos más importantes es la fachada, que influencia el valor de los inmuebles y la propia percepción de la sociedad sobre sus moradores. En ese trabajo se presenta un estudio que incluyo ampliación y renovación de fachadas en un conjunto habitacional social en San Leopoldo, ciudad al sur de Brasil.Some part of the stock of social housing in Brazil has deteriorted due to lack of maintenance. The depreciation of these constructions, especially in the case of housing projects, reduces the quality of environment, with social and economic consequences for inhabitants, and also for the region. Building renewal is an important action to recover the lost quality of the life. The increase in life time of housing may also reduce the construction and demolition waste production. One of the most important aspects is the facade, which influences the value of the property and the perception of the society about the inhabitants. This work presents a study of improving and facade renewal of social housing in Sao Leopoldo, a southern Brazilian city.

  1. Edificio de la O.M.S., en Ginebra (Suiza

    Directory of Open Access Journals (Sweden)

    Tschumi, J.

    1968-07-01

    Full Text Available This project consists mainly of an administrative block, of 8 storeys, and two basements, which houses the general services, and the administrative and social offices of the World Health Organisation, The social services occupy the top part of the building, so that the marvellous panorama of the Lake Leman, the Jura Mountains and Alps can be admired from its windows. There is also a building containing a lecture hall with a capacity for 400 people, fitted with simultaneous translation services, and which can be occasionally transformed into a cinema.Consta en esencia: 1 De un bloque administrativo, con ocho plantas de altura y dos niveles inferiores, que alojan los servicios: generales; administrativos, y sociales de la Organización Mundial de la Salud (O. M, S.; estos últimos organizados en la parte más alta, con el fin de permitir la observación del maravilloso panorama que se divisa sobre el lago Leman, el Jura y los Alpes. 2 De un edificio, destinado a sala de conferencias, con capacidad para unas 400 personas, dotado de equipos para traducción simultánea, y que en determinadas ocasiones puede transformarse en cine.

  2. Edificio administrativo y de viviendas - Hannover (Alemania Federal

    Directory of Open Access Journals (Sweden)

    Oesterlen, Dieter

    1972-03-01

    Full Text Available This project has a residential section, flats and apartments, and an extensive zone devoted to office space. There is also an underground parking facility with room for 60 cars. Special attention has been devoted to the overall harmony of the design, as well as to its functionality, rational distribution, good use of materials, colouring, and ease of maintenance. The building has every modern aid for comfortable occupancy, and the most recent technological innovations have been used. There are nine flats, each varying in size and distribution. In the office zone, there are lecture halls, council rooms, a canteen and terrace areas.Conjunto constituido por una parte residencial —viviendas y apartamentos—, gran zona de representación, oficinas, y sótano con aparcamiento para unos 60 vehículos. Se ha cuidado especialmente la armonía total, la funcionalidad de su distribución y el uso de materiales agradables, de suave contraste cromático y fácil entretenimiento. El complejo dispone de todas las comodidades y ha sido acondicionado con todos los adelantos de la técnica moderna. Las viviendas son nueve, con diferentes superficies y distribución. El edificio administrativo comprende las oficinas, salas de conferencias, salas de consejo y de juntas, cantina y terrazas.

  3. Edificio de la radio en Eisenstadt – Austria

    Directory of Open Access Journals (Sweden)

    Peichl, Gustav

    1973-06-01

    Full Text Available These Studies have been made for a twostorey building, completely constructed in reinforced concrete. On the first floor, the heating, ventilation and air-conditioning installations; a shop; a lounge room for the employes and a filing room have been arranged. On the top floor are distributed: the study and control room; the office of the director; the information section; utility room and first aid room. A stairway communicates the two floors. Entry to the building is had through the vehicles' access of the first floor and by an overpass that connects the top floor with the parking area situated on the same level. The reinforced concrete employed in the construction of the building has been left visible on the outside paraments, in the hollow spaces of which metallic carpentry with single or double glass has been used, in accordance with the needs of acoustic insulation of the different areas.Se han planteado estos Estudios en un edificio de dos plantas, realizadas totalmente en hormigón armado. En la baja se dispusieron las instalaciones de calefacción, ventilación y aire acondicionado; un taller; una sala de estar para los empleados, y un archivo. En la superior se distribuyen: el estudio y la sala de control; las oficinas del director; la sección de información; oficio, y botiquín. Una escalera comunica ambas plantas. La entrada del edificio se realiza por el acceso de vehículos de la planta baja y por un paso elevado que comunica la planta alta con la zona de aparcamientos, situada al mismo nivel. El hormigón armado empleado en la construcción del edificio se ha dejado visto en los paramentos exteriores, en cuyos huecos se ha empleado carpintería metálica de cristal único o doble, según las necesidades de aislamiento acústico que tengan las zonas a las que sirven.

  4. Tres experimentos Modernos. El proceso de proyecto del edificio Positano

    Directory of Open Access Journals (Sweden)

    Juan Pablo Tuja

    2017-04-01

    Full Text Available El edificio Positano, proyectado durante la década de 1950 por el arquitecto Luis García Pardo, marca un hito en la arquitectura de la vivienda colectiva moderna en el Uruguay. Para concretar este edificio, el arquitecto -y promotor inmobiliario a la vez- desarrolló una serie de proyectos, identificándose tres proyectos completamente documentados. Esta serie posee un fuerte carácter moderno y experimental, el cual se expresa en la volumetría general, la implantación, en el desarrollo tipológico, el diseño estructural y el diseño de los cerramiento exteriores. El último proyecto, realizado en asociación con el joven arquitecto Adolfo Sommer Smith, comienza a construirse en 1959. La serie de proyectos, evidencia un creciente proceso de “abstracción”, tanto formal como conceptual. Lo cual conducirá por un lado a simplificar formas y reducir elementos, y por otro a diseñar dispositivos de mayor complejidad, capaces de resolver funciones diversas al mismo tiempo. A partir de la búsqueda y clasificación de documentación de época –planos, fotografías, artículos, entre otros–, el presente trabajo intentó ensayar una interpretación proyectual, exponiendo las principales preocupaciones y estrategias de los arquitectos. El ensayo buscó reconocer repeticiones, iteraciones, dudas y certezas de un proceso proyectual intenso, que transitó los bordes de la disciplina.

  5. Diagnosis and treatment for sick building; Diagnostico y tratamiento para edificios saludables

    Energy Technology Data Exchange (ETDEWEB)

    Perez, Maria M; Salomon, Jorge A; Lazcano, Alejandro S [Facultad de Ingenieria UADY, Merida Yucatan (Mexico)

    2000-07-01

    In recent years, the indoor air quality (IAQ) in work spaces have acquired special importance. Health symptoms refer to a productivity and economic loss. IAQ health symptoms associated with acute discomfort that improve while away from work. More common, however, are apparent outbreaks of illness within work spaces in which neither environmental causes non recognized diseases can be identified. Usually reported within the last years, these events are often called sick building syndrome. To determine a sick building diagnosis and treatment, it is necessary to plan methodology based on environment comfort, habitability, energy efficiency use and nature preservation. Hereby it is presented a methodology to determine a sick building diagnosis and treatment which was applied in Superior Court of Justice building (Tribunales Primero y Segundo del Decimocuarto Circuito del Poder Judicial de la Federacion), where employees have expressed diseases as sleepiness, cold and difficulty breathing. [Spanish] En los ultimos anos, la calidad del aire en el ambiente de trabajo ha adquirido especial interes debido a la importancia que representa para el bienestar, eficiencia y productividad de los empleados. Los edificios carentes de esa calidad del aire ocasionan trastornos de salud relacionados con la falta de confort que prevalece en el ambiente de trabajo, es comun encontrar en los empleados que alli laboran, brotes de sintomas como dolores de cabeza, letargo y resfriados, entre otros. Usualmente encontrados en los ultimos anos en ambientes de oficinas a estos sintomas se les llama sindrome del edificio enfermo. Para lograr el diagnostico y tratamiento de un edificio enfermo es necesario plantear una metodologia basada en criterios de confort ambiental, habitabilidad, uso eficiente de la energia y preservacion del medio ambiente. En este trabajo presentamos una metodologia para el diagnostico y tratamiento de edificios con ese sindrome y presentamos un estudio de casos de los

  6. Edificio de viviendas en Madrid - España

    Directory of Open Access Journals (Sweden)

    González Cruz, J. Luis

    1978-09-01

    Full Text Available An apartment block was built using only little more than 50% of the available irregular-shaped 1,773 m2 plot area, consisting on 12 storeys above grade, one semibasement floor for offices and two underground levels for carpark and mechanical installations. The remaining area was landscaped for public use. The elongated rectangular configuration of the typical floor plan and the multiple vertical traffic cores have permitted and optimal space organization of the housing units, opening to two opposite directions, thus using the maximum advantages for natural lighting and ventilation, sun exposure and views. The structure of the building is based on reinforced concrete shear walls, with ceramic prefab, one-way reinforced flooring units in the apartment storeys and cross-ribbed reinforced concrete slabs in the basement areas. The decorative features of the concrete used have been applied at their best to create an aesthetic appearance, combined with the treatment of the external walls.

    Ocupando poco más del 50% de una parcela irregular de 1.733 m2 de superficie se ha levantado este edificio de viviendas de 12 plantas sobre rasante, un semisótano destinado a oficinas y dos sótanos que albergan los aparcamientos y las instalaciones generales de la construcción. El resto del solar se dedica a jardines y a zona de uso público. La configuración de la planta tipo según un rectángulo muy alargado y la multiplicidad de los núcleos de comunicación vertical, ha posibilitado una óptima organización de las viviendas con dos orientaciones opuestas que permiten sacar el máximo partido de la iluminación, ventilación, soleamiento y vistas exteriores. El edificio se ha realizado con estructura vertical de vigas-muro de hormigón armado, con forjados unidireccionales cerámicos en las plantas de vivienda, y de losa armada birreticular en los sótanos. En el aspecto estético se han aprovechado las ventajas

  7. Edificio para el Commerzbank AG - Dusseldorf - Alemania Federal

    Directory of Open Access Journals (Sweden)

    Schneider Esleben, P.

    1973-07-01

    Full Text Available The administrative centre of the Commerzbank AG is located in a building of rectangular plan, which consists of twelve stories, ground floor and underground for parking. The ground floor has been left as clear as possible in order to enable vehicles to reach the autobank counters. The upper floors contain the offices. The whole structure is built with concrete, formed by beams which are supported by rows of pillars which. In their turn, transmit the weight to the three unique supports of the ground floor. The facade is built with panels in which the windows are incorporated, and which are composed of two aluminium sheets and a filling of alveolar insulation, with a protection device against sunliglit on its interior part which consists of reflecting plastic laminas. The building is joined with tlie main administrative centre on the other side of the street by means of a suspended crossing, with steel cables, from the tower which was built for this purpose on one side of the new block and which shelters at the same time the centre of the vertical communication as well as the technical installations for ventilation.La sede administrativa del Commerzbank AG se ha dispuesto en un edificio de planta rectangular, constituido por doce plantas elevadas, baja y sótano de aparcamiento. La baja se dejó lo más diáfana posible para permitir el acceso de vehículos hasta las taquillas: autobanco. En las plantas superiores se han distribuido oficinas. Se empleó hormigón en la totalidad de la estructura, formada por vigas, apoyadas sobre filas de pilares, que a su vez transmiten las cargas a los tres únicos soportes de la planta baja. La fachada se ha realizado a base de paneles que llevan incorporadas las ventanas y están compuestos por dos láminas de aluminio y relleno de aislante alveolar, con un dispositivo de protección solar en su parte interior, que consiste en unas láminas reflectantes de plástico. El edificio está unido al centro

  8. Eficiencia energética y confort en edificios de oficina: El caso alemán

    Directory of Open Access Journals (Sweden)

    Ernesto Kuchen

    2012-12-01

    Full Text Available La construcción de edificios en los últimos 15 años en Europa persigue el objetivo común de dar respuesta al problema de la Eficiencia Energética y el Confort en espacios de trabajo. Las propuestas de cambio se inclinan por el desarrollo de una arquitectura “transparente”, con extensas superficies de vidrio expuestas. Dicha práctica se hace llamar ecológica y sustentable. Con el tiempo, el uso y la experiencia ponen en alerta a científicos del área. El objetivo del trabajo es detectar los aspectos más relevantes que afectan la Eficiencia Energética (EE y el Confort de espacios reales de trabajo para la elaboración apropiada de herramientas de diseño y cálculo. Para ello, se lleva a cabo un trabajo de campo en base a mediciones y encuestas en 19 edificios de oficina, en Alemania. Del monitoreo energético y del análisis del Confort se detectan potenciales de optimización. Se observa que la EE no se logra al conectar el edificio a la red energética una vez finalizada la obra arquitectónica. Por el contrario, la planificación integral, el monitoreo y el seguimiento en la vida útil del edificio permiten corregir y lograr mejores niveles de EE y Confort.

  9. Influencia del acristalamiento sobre los parámetros y la calificación energética de acuerdo con la orientación del edificio y los porcentajes de aberturas de fachada = The influence of glazing over the parameters and energy rating according to the building orientation and the façade openings percentages.

    Directory of Open Access Journals (Sweden)

    Jorge Ávila-Delgado

    2016-04-01

    Full Text Available Es bien conocida la importancia de los cristales en la demanda de energía del edificio, ya que la envolvente térmica es lo más importante. En este trabajo se ha realizado un estudio de la influencia de la transmitancia térmica (factor U y el factor solar (valor g de tres tipos diferentes de acristalamiento en la calificación energética. Se ha realizado el análisis en una vivienda unifamiliar situada en la ciudad de Sevilla, España, con diferentes hipótesis, en concreto seis porcentajes de apertura que van desde 10 a 60% considerado por el Código Técnico de la Edificación español, y cuatro orientaciones según las direcciones cardinales. Para los tipos de zona climático y acristalamiento considerados, el valor del parámetro g tiene mayor incidencia en el rendimiento energético que la transmitancia térmica. Se ha establecido qué orientación proporciona mayor ahorro de energía, independientemente de la demanda de calefacción y enfriamiento y de la calificación energética. Además, hay que considerar los valores ideales de ambos parámetros para cada orientación con el fin de mejorar la calificación energética. Por lo tanto, al seleccionar un tipo de acristalamiento, sería importante tener en cuenta los mejores valores de los parámetros "T" y "g" para cada orientación con el fin de obtener menor gasto de energía. Abstract It is well known the significant impact of glazing over the building energy demand making it the thermal envelope’s most important part. A study of the influence of thermal transmittance (U-factor and solar factor (g-value of three different glazing types over the parameters and energy rating are shown in this paper. A single-family dwelling located in Seville city, Spain, has been analyzed to which a set of hypotheses, six opening percentages ranging from 10 to 60% considered by the Spanish Building Code on its simplified option, and different combinations, four orientations matching the cardinal

  10. Edificio industrial Crane-Fisa, España

    Directory of Open Access Journals (Sweden)

    Heredia & Moreno S. A., Ingenieros

    1970-11-01

    Full Text Available This article describes the construction of an important industrial building near Madrid. It consists of a large industrial nave and a block of offices. The structure is metallic, and the enclosing walls are of brick, whilst the the roofing material is aluminium and steel. This project is very effectively fitted with heating, air conditioning, air and propane gas installations, and an elaborate electricity supply system.En este artículo se describe, con claridad, la construcción de un importante edificio industrial en las proximidades de Madrid. Se compone de una gran nave de fabricación y un cuerpo más bajo destinado a oficinas, con estructura metálica, cerramiento a base de paneles de fábrica de ladrillo y cubierta de placas de aluminio-acero. Se han previsto, asimismo, las adecuadas instalaciones de suministro y evacuación de agua, calefacción, ventilación, aire acondicionado, aire comprimido y propano, además de una completísima instalación eléctrica.

  11. Intercambios convectivos en el interior de los edificios

    Directory of Open Access Journals (Sweden)

    Roset, J.

    1987-12-01

    Full Text Available Convection inside buildings is the main mechanism to explain heat transfer among its parts. The numerical model, we use in this work, is bidimensional with the heat flux in laminar regime. We simule different thermal conditions of a room with one of its walls having several non-uniform distributions of temperature. We obtain, for these configurations, the heat fluxes through the different parts of the wall and the final distribution of the temperatures inside the whole room.

    La convección en el interior de los edificios es el principal mecanismo de transferencia de calor entre las partes de los mismos. El modelo numérico que se utiliza en este trabajo es bidimensional con el flujo de calor en régimen laminan Se simulan diferentes condiciones térmicas de un cerramiento con la hipótesis de que una de sus paredes es sometida a varias distribuciones de temperatura no uniformes. Se obtienen, para estas configuraciones, los flujos de calor en las distintas partes de la pared así como la distribución final de temperaturas en el interior de toda la habitación.

  12. Edificio de viviendas, en Madrid (España

    Directory of Open Access Journals (Sweden)

    Barbero Rebolledo, Manuel

    1966-09-01

    Full Text Available This is a housing block catering for medium income families. It includes eight different types of flats, but the most frequent one has a floor area of 120 m2, and comprises a living-dining room, three bedrooms, a service bedroom, kitchen, scullery, two bathrooms and several built in cupboards. The flats are wonderfully successful. Their interior decoration is adequate, the external walls are highly plastic, and very pleasantly coloured, and the balconies provide an interesting repetitive pattern motif.Destinado a viviendas de tipo medio, este edificio aloja ocho tipos de pisos; pero el prototipo más repetido tiene unos 120 m2; y su programa es de: living comedor, tres dormitorios principales y uno de servicio, cocina, despensa, ropero y dos cuartos de aseo. Las viviendas funcionan maravillosamente, su tratamiento interior es decoroso, adecuado, y la fachada principal del bloque es de una plástica notable, conseguida tan sólo con colores agradables y con la alternancia y forma de los balcones.

  13. Edificio del Congreso Bad-Gastein – Austria

    Directory of Open Access Journals (Sweden)

    Garstenauer, G.

    1975-06-01

    Full Text Available One of the most outstanding characteristics of this Congress Centre is its great adaptation to the hilly ground on which it is situated occupying a very small area and having successfully solved the problem of a difference of elevation of 50%. The entrance to the building is on the top floor, placed at the level of the street that limits the plot in its highest section. On this floor, which is covered by a transitable terrace, are the various offices and premises for the use of the congress members. Below the entrance level is the technical floor which holds all the installations of the building and immediately below this floor is the great congress hall in two levels and with a varying capacity of 800 to 1,500 persons. Finally, two storeys, situated in the lowest part of the building, are reserved for storage rooms, and garages. The construction has almost entirely been carried out by means of prefabricated members, out of which the most important ones are: columns with square cross-section, with big supporting heads that support an approximate load of 2,000 t; the girder in the shape of an inverted T; and the double ceilings of prefabricated plates which by means of concrete foundations rest upon the caisson ceiling in squares of double web girders.Una de las características más sobresalientes de este Centro de Congresos es su gran adaptación al accidentado terreno en el que se encuentra enclavado, de superficie muy reducida y con un desnivel que supera el 50%. El acceso al edificio se efectúa por la planta superior, situada a nivel de la calle que limita la parcela en su parte más alta. En esta planta, cubierta por una terraza transitable, se han dispuesto diversas oficinas y locales para uso de los congresistas. Por debajo del nivel de entrada se encuentra la planta técnica, que agrupa todas las instalaciones del edificio, e inmediatamente debajo de ella, el gran salón de congresos, en dos niveles y con capacidad variable

  14. Edificio Charles Wilson, en la Universidad de Lecester, Inglaterra

    Directory of Open Access Journals (Sweden)

    Lasdum, Denis

    1969-05-01

    Full Text Available The main purpose of this social university building is to house the means of serving 2750 meals daily to the students and academic staff. Its enclosing structure consists of precast concrete elements, and the central nucleus is made with concrete cast at the site. It comprises ten floor levels, details of which are as follows. The basement mentains the kitchens and ancillary services. On the ground floor is the hall, snack-bar, library and offices. The second floor is occupied by the administrative offices and changing rooms. The third, fourth and fifth floors are entirely taken up with a self-service restaurant. On the sixth floor there is another restaurant, served by waiters. There is a senior room on the seventh floor. The next three floor levels are a vertical extension of the central nucleus, and the space is mainly devoted to a common hall. Finally, on the 11th floor, there are rooms for exhibitions, music recitals, and similar cultural activities.La misión principal de este edificio social universitario es la de poder servir en su interior 2.750 comidas diarias a estudiantes y personal académico. Tiene estructura perimetral a base de elementos prefabricados de hormigón, y el núcleo central está construido con hormigón armado realizado in situ. Se compone de diez plantas: El sótano contiene las cocinas y servicios anexos. En la planta baja se distribuyen el hall, snack-bar, biblioteca y oficinas. En el entresuelo están los guardarropas del edificio y oficinas administrativas. Las plantas 1.ª, 2.ª y 3.ª alojan un restaurante, que funciona en régimen de autoservicio. En la 4.ª planta hay otro restaurante, con servicio a la carta, atendido por camareros. La 5.ª planta alberga la sala «senior ». Las plantas 7.ª, 8.ª y 9.ª, prolongación vertical del núcleo central, tienen una sala común. Y, finalmente, en la planta 10.ª se celebran diversas manifestaciones : exposiciones, recitales de música, etcétera.

  15. Nodo sensor para la medida ambiental de CO2, temperatura y humedad

    OpenAIRE

    Jara Burgos, Marcos

    2007-01-01

    En este documento se describe el diseño y la implementación de un nodo sen-sor para la medida ambiental del nivel de CO2, la temperatura y la humedad relativa. El sistema se basa en un interfaz directo sensor a microcontrolador para las medidas de temperatura y humedad relativa, mientras que para el sensor de CO2 se basa en una conversión analógica digital. El sistema utiliza un sensor resistivo para medir la temperatura, un sensor capacitivo para medir la humedad relativa y un sensor...

  16. Edificio Lonza, S. A., en Basilea, Suiza

    Directory of Open Access Journals (Sweden)

    Suter & Suter, Arquitectos

    1966-07-01

    Full Text Available The building has three basements, ground floor and 19 storeys above ground. The basements accommodate such things as the telephone exchange, stores, and records offices. The ground floor is an open space, with some seats, and the glass enclosed cabin for the concierge. The 18 top floors are mainly devoted to office space, and the 19th also contains many of the building's installations. The materials and constructive systems are very modem, and are the most adequate to the functions of the building, as well as those most suited to achieving a quick and low cost construction.El edificio consta: de tres plantas de sótanos, planta baja y 19 plantas de altura. En las plantas enterradas se distribuyen la central telefónica, almacenes, archivos, etc. La planta baja resalta por su diafanidad, y en ella sólo hay algunos grupos de asientos y la cabina de cristal para el conserje. Las 18 plantas siguientes albergan los despachos, y en la 19.ª se han dispuesto todas las instalaciones. Los materiales y sistemas constructivos adoptados han sido los más modernos y los más adecuados al uso del edificio, rapidez y economía de construcción.

  17. Cermets Ni-GDC para su uso como ánodos en IT-SOFC basadas en electrolitos GDC

    Directory of Open Access Journals (Sweden)

    Gil, V.

    2008-08-01

    Full Text Available The purpose of this work is to investigate the possible solid state reactions between the NiO-Ce0.9Gd0.1O1.95 (NiO-GDC composites with 50% wt NiO, and cermets Ni- Ce0.9Gd0.1O1.95 (Ni-GDC with 39 vol. % of Ni, and electrolyte solid solutions based on Ce0.9Gd0.1O1.95 (GDC employing the X-ray diffraction technique. At the same time the thermochemical and thermomechanical compatibility between these materials was established. Results obtained from SEM and EDAX analysis showed that the electrolyte based on ceria (GDC and the anode based on nickel-ceria cermet (Ni-GDC present good adhesion and well defined interfaces. No reactive phases and other type of defects were detected. This study showed that both materials, Ni-GDC and GDC are thermochemical and thermomechanically compatible.

    El objetivo de este trabajo es estudiar en un amplio rango de temperaturas (1000-1450ºC y mediante difracción de rayos-X (DRX las posibles reacciones en estado sólido que pueden tener lugar en las regiones interfaciales de sistemas constituidos por composites NiO-Ce0.9Gd0.1O1.95 (NiO-GDC con un 50% en peso de NiO, y de Cermets Ni-Ce0.9Gd0.1O1.95 (Ni-GDC con un 39% en volumen Ni, y electrolitos basados en soluciones sólidas Ce0.9Gd0.1O1.95 (GDC. Y así mismo, estudiar la compatibilidad termoquímica y termomecánica entre los distintos materiales cerámicos que constituyen los sistemas electrolito/ánodo. Se confirma mediante MEB y análisis EDAX que los sistemas cosinterizados entre 1350 y 1400ºC durante 2h y constituidos por un electrolito basado en ceria (GDC y un ánodo basado en un cermet níquel-ceria (Ni-GDC, presentan una buena adherencia entre capas, sin la formación de defectos y sin la presencia de interdifusión de especies a lo

  18. Edificio para oficinas en la Universidad de California

    Directory of Open Access Journals (Sweden)

    Lin, T. Y.

    1964-09-01

    Full Text Available California University has just completed two buildings at Davis, one of nine storeys, and another smaller one, devoted to offices. Building involved the use of prefabricated, prestressed, load bearing units. The production and placing of these units required a very strict program of control and planning, as each of these operations had very specific features that were not straightforward. The walls, roof and floorings were made of load bearing panels. The lift and stair box was also an important structural element. Both this box and the cross bracing will take up loads arising from possible earthquake effects. As the building is situated on ground with poor resistance, the foundation consists of a number of inverted arches, which float on the soil, and distribute the loads uniformly over a wider area. The lifting of the various units was carried out with two moveable cranes fitted with very long lifting arms, both of which were operated in a closely integrated manner. The final success has been outstanding, both owing to the low cost, the saving in time, and also because it will be easy to extend the project at a later date, by merely moving the position of the lift box, and using the same type of building units.La Universidad de California acaba de construir dos edificios en Davis, uno de nueve plantas, destinado a clases, y otro de menor importancia para oficinas. La construcción debía realizarse con elementos prefabricados, pretensados y autorresistentes. La colocación y preparación de estos elementos se sometió a un estrecho y riguroso programa que se denominó crítico, pues cada una de sus fases presentaba particulares características que la diferenciaba de la siguiente. Los elementos constructivos principales—muros, cubierta y forjados—, debían componerse de paneles autorresistentes. Las cajas de escaleras y ascensores son, asimismo, resistentes; dichas cajas, junto con el arriostramiento general, absorben la mayor parte de las

  19. Reforma de edificios antiguos. El rasgado de huecos en muros de carga

    OpenAIRE

    Soto Pardo, M.

    1985-01-01

    La apertura de huecos en muros de carga es una operación frecuente en la reforma de edificios antiguos. Una correcta ejecución exige la puesta en carga de la estructura sustentante —normalmente un pórtico metálico— mediante gatos hidráulicos o algo similar, cosa que suele omitirse, dando lugar a dos problemas diferentes: uno, el desprendimiento diferido del área de descarga, con alarmantes fisuraciones y otro, sin efectos ostensibles, pero mucho más peligroso, como es la sobrecarga elevadísim...

  20. Edificio Roca, calle San Vicente, 32 (1934-36) Valencia: proyecto de interiorismo

    OpenAIRE

    CARBONELL SANTACRUZ, MARÍA DE LA LUZ

    2012-01-01

    Este Proyecto Final de Grado trata sobre la reutilización del Edificio Roca (1934-36), que está situado en la calle San Vicente, 32, de Valencia y es obra del arquitecto Vicente Valls Gadea (1985-1922). El proyecto se articula en tres fases. La fase inicial comienza con el estudio histórico de la ciudad de Valencia. A continuación trata de la arquitectura europea a partir de la Revolución Industrial y el movimiento arquitectónico racionalista en Valencia. Por último, se estudia la calle...

  1. Recuperación de la verticalidad de un edificio

    Directory of Open Access Journals (Sweden)

    Iturraspe, Andrés

    1975-09-01

    Full Text Available This article describes the highly specialized operations undertaken in order to restore the verticality of a 4-storey building, devoted to flats, whose foundations had suffered a severe settlement; after having previously stopped the settlement process. The pillars were lifted with jacks. The paper also describes the operations applied to the walls the jacking and recuperating means, the control of the damaged structure, withdrawel of supports, etc.Se describen en el artículo las operaciones de alta especialización realizadas para devolver la verticalidad a un edificio de 4 plantas, destinado a viviendas, que había sufrido un fuerte asiento de cimientos, después de detener el proceso de dichos asientos. Se han elevado con gatos los pilares que habían descendido más, explicándose, asimismo, el procedimiento seguido en las fachadas sin pilares, geometría de recuperación, elementos de elevación, sujeción de la estructura rota, retirado de apoyos, etc.

  2. Edificio para viviendas - Madrid (España

    Directory of Open Access Journals (Sweden)

    Camuñas, Estudio de arquitectura

    1972-10-01

    Full Text Available This building consists of 8 floors with 94 apartments, business premises, caretakers' apartments, and a basement garage with room for 132 vehicles. As the allotment was quite deep and a courtyard facing the street was not required, spacious interior courtyards were created which give a great deal of light, liberal ventilation and a certain nobility to the apartments overlooking these courtyards. There is only one entrance hall in which are found the lifts and on to which the various stairs converge. It is treated in landscape form. The structure is of reinforced concrete and the system of floorings is continuous with neither girders nor projections.El edificio se compone de 8 plantas con 94 viviendas, locales de negocios, viviendas auxiliares para conserjes, y sótano- garaje capaz para 132 vehículos. Dado que el solar tenía mucho fondo y no estaba previsto patio de manzana, se crearon amplios patios interiores que permitieran grandes luces, ventilación pródiga y cierta nobleza a la parte de las viviendas recayente a dichos patios. El zaguán es único, y de él parten las distintas escaleras y núcleos de ascensores. Está tratado de forma paisajística. Tiene estructura de hormigón armado y el sistema de forjados es continuo sin viguetas ni resaltos.

  3. The distribution of the electric energy consumed in the World Trade Center building; La distribucion de la energia electrica consumida en el edificio World Trade Center

    Energy Technology Data Exchange (ETDEWEB)

    Gaona de la Fuente, Alvaro; Carrillo Borja, Angel [Luz y Fuerza del Centro, Mexico, D. F. (Mexico)

    1997-12-31

    This document describes the distribution of the electric energy in the World Trade Center building. Also called the Business International Capital, it is a modern international concept that integrates under the same roof services and supports required by the foreign commerce, with a great 50 stories high building, information network, a business center, a commercial center, an international center for exhibits and conventions and a luxury hotel. It is a modern building equipped with a numberless technological advancements an a total installed electrical load of 35000 kVA. The distribution structures utilized for high buildings are described, the structure that was decided to adopt in the World Trade Center, the requirement for the execution of the distribution electric work, the Luz y Fuerza installations in the buildings conglomerate, the operation and maintenance of the distribution network of this building and the basic needs for new installations of this type of buildings [Espanol] En el presente documento se describe la distribucion de la energia electrica del edificio World Trade Center de la ciudad de Mexico. Llamado tambien la capital internacional de los negocios es un moderno concepto internacional que integra bajo un mismo techo servicios y apoyos que se requieren para el comercio exterior contando con una gran torre de 50 pisos, red de informacion, un centro de negocios, un centro comercial, un centro internacional de exposiciones y convenciones y un hotel de lujo. Es un edificio moderno equipado con un sinnumero de adelantos tecnologicos y con una carga total instalada de 35000 kVA. Se describen las estructuras de distribucion utilizadas en edificios altos, la estructura que se decidio implantar en el World Trade Center, los requerimientos para la ejecucion de la obra electrica de distribucion, las instalaciones de Luz y Fuerza en el conjunto de dicho edificio, la operacion y mantenimiento de la red de distribucion de este edificio, y las necesidades

  4. Las comunicaciones móviles en los edificios inteligentes

    OpenAIRE

    Reyes Muñoz, María Angélica

    2011-01-01

    Este trabajo presenta una plataforma de red móvil aplicada a los entornos de edificios inteligentes. En primer lugar, los edificios inteligentes han sido definidos como “aquellos que utilizan la tecnología computacional para gestionar de manera autónoma todos los servicios que ofrece un entorno de un edificio tales como optimizar el confort del usuario, el consumo de energía y la seguridad” [Callaghan 00].Desde el punto de vista de las telecomunicaciones específicamente desde e...

  5. ANÁLISIS DE LA DISTRIBUCIÓN ESPACIAL DE NODOS DE SERVICIOS EN LA SEGUNDA FRANJA RESIDENCIAL DE UNA CIUDAD INTERMEDIA PATAGÓNICA COMO APORTE AL DIAGNÓSTICO TERRITORIAL

    Directory of Open Access Journals (Sweden)

    Alicia Cáceres

    2008-12-01

    Full Text Available Río Gallegos, es una ciudad intermedia monocéntrica de la Patagonia austral argentina con función político administrativo en proceso de metropolización. La segunda franja residencial es la extensión del área central en un segundo momento de crecimiento de la población a partir de la década del ́60 debido a la importancia de la actividad ganadera ovina, asentamiento de la administración de Yacimientos Carboníferos Fiscales (YCF, de los campamentos de Yacimientos Petrolíferos Fiscales (YPF y la administración pública. Estas actividades atrajeron a migrantes de otras provincias argentinas y del sur de Chile que ocupan acelerada y espontáneamente tierras fiscales, principalmente con viviendas uni y multifamiliares, en parcelas urbanas de dimensiones mínimas. Esta área residencial, densamente poblada, requirió del incremento de servicios y equipamiento básico de salud, educación, recreativo, deportivo, seguridad, de asistencia social, de sanidad, necesarios para el funcionamiento y atención de los habitantes. Estos equipamientos, dependientes algunos de la administración provincial, otros de la municipal, se localizan en parcelas cercanas que comprenden unas pocas manzanas, cuya concentración constituyen nodos de servicios que atraen otros usos como el comercial. Los nodos de servicios comprenden áreas de influencia delimitadas por el Estado municipal con diferente cantidad de población. De este modo este trabajo tiene como objetivo conocer de los nodos de servicios la relación entre la cantidad de la población de las áreas de influencia y la distribución espacial, para evaluar si los requerimientos de servicios básicos de la población de la segunda franja residencial están atendidos. Se destaca la importancia de los resultados que sirven de aporte para estudios referidos al diagnóstico territorial. La metodología adoptada consiste en localizar los nodos de servicios con sus respectivas áreas de influencia a partir

  6. Vaciado de edificios conservando la fachada

    Directory of Open Access Journals (Sweden)

    González Rodríguez, Santiago

    1984-09-01

    Full Text Available This study, which is presented under the heading «The gutting of buildings while maintaining the facade», takes up not only the technical aspect of restructuring buildings, but also the legal aspects concerning rehabilitation and its problems. Following a brief commentary on prevailing legislation, it goes into rehabilitation in search of solutions which might lend more effectiveness to administrative work oriented towards the aim of keeping up artistic and cultural heritage. Urban standards of protection and the Municipal Bylaws for the Control of Rehabilitation Assistance are analyzed, in which one begins to see good intentions on the part of the Madrid City Council and an awareness of the problem, raising grants and financial aid, though still somewhat timidly, for the upkeep of urban patrimony. It is important to stress the distinction which is made between normal or 'ordinary* upkeep of a building and outstanding or 'extraordinary* upkeep in as much as it affects the obligations pertaining to property, as long as it does not exceed the limit of the obligation of maintenance which corresponds to it, as well as affecting the Government with respect to the obligation incumbent on it to provide the necessary assistance. Regarding the technical aspect, without trying to be rigorous, a simple and practical method is expounded for the temporary maintenance of facades while going ahead with the substitution of the interior of the building. Besides the recommendations on the precautions that should be taken and the description of the shoring-up system, the criteria for calculating the tubular metallic structure, the regulations to be applied and the approximate costs per square meter are provided.Bajo el título « Vaciado de edificios conservando la fachada», se presenta este trabajo que recoge» no sólo el aspecto técnico de la reestructuración de edificios, sino también aspectos legales sobre la rehabilitación en general y su problem

  7. Edificio de viviendas residenciales, en Caracas (Venezuela

    Directory of Open Access Journals (Sweden)

    Beckhoff, P.

    1967-06-01

    Full Text Available This is a very well designed building, both in its internal distribution and inner and outer ornamentation. It has 12 storeys, and an outstanding feature of it is the exceptional landscaping of its terraces, and the very attractive aspect of the external elevations. There is every evidence of carefully and elaborate design, leading to a fine example of good taste and excellent architecture.Bien resuelto, desde el doble punto de vista de su distribución y ornatos exterior e interior, este edificio, de 12 plantas de altura, se distingue, además, por el tratamiento paisajístico de sus terrazas y por la composición estética de sus fachadas. Todo denota un cuidadoso y elaborado estudio, que ha conducido al logro de una muestra perfecta de buen gusto y de arquitectura ejemplar.

  8. Protecciones solares y su implicancia en la demanda energética: caso edificio público en Concepción, Chile

    OpenAIRE

    Jazmín Jara Córdova

    2015-01-01

    Determinar las ganancias solares en el vano-ventana con protecciones solares y analizar el comportamiento térmico en un edificio es un tema relativamente nuevo en el ámbito chileno. No obstante, el inadecuado manejo del control solar, en algunos casos, genera problemas de sobrecalentamiento al interior de la edificación. Esta investigación busca establecer un procedimiento que permita evaluar cuatro tipos de protecciones solares y analizar sus implicancias energéticas en un edificio público, ...

  9. El edificio como un sistema de gestión de información

    Directory of Open Access Journals (Sweden)

    Triviño Barros, Gracián

    2003-12-01

    Full Text Available The current state of development of the technologies of information and communications is modifying the way the project of designing, executing and maintaining a Building must face. On the one hand during the Building cycle of live it is generated an important amount of information that is managed by different people or different teams. The responsibility of these people starts and ends with the different project phases. On the other hand the knowledge required to describe and manage properly a medium size building system is sp read in an important number of technological and scientific disciplines. Because the current level of development of these technologies this knowledge management must be shared out between different specialists. In this situation building management will overtake managers human capabilities if they are not provided with the adequate computer based tools.El desarrollo de las tecnologías de tratamiento de información y las telecomunicaciones está modificando la forma más adecuada de enfrentarse al proyecto de diseño. construcción y explotación de un Edificio. Por un lado a lo largo del ciclo de vida de un Edificio se genera y debe gestionarse una gran cantidad de información cuya gestión corresponde a diferentes personas o grupos de trabajo cuya responsabilidad empieza y termina según se van sucediendo las diferentes fases de proyecto. Por otro lado los conocimientos necesarios para describir y gestiona r con eficacia el sistema constituido por un edificio de mediana complejidad están dispersos en un amplio número de disciplinas tecnológicas y científicas. Debido al desarrollo actual de las distintas tecnologías la gestión de estos conocimientos debe ser realizada por personal especializado. En esta situación la gestión óptima del edificio como un sistema integrado está asociada con la gestión de un sistema de información cuya complejidad frecuentemente desbordará la capacidad de las personas

  10. Estudio de reutilización de un edificio sin uso. Plaza de toros de Ibi (Alicante)

    OpenAIRE

    Picó Gómez, Iván

    2015-01-01

    La reutilización de edificios con cambio de uso supone una práctica relativamente usual en la actualidad, cuyo recorrido en la historia ha pasado del mero aprovechamiento de espacios a ser una alternativa de construcción. Muchos son los ejemplos alrededor del planeta sobre esta práctica, la rehabilitación adaptada con cambio de uso, materializándose desde épocas antiguas y existiendo claros ejemplos, como: el Partenón de Atenas, Santa María del Naranco en Asturias o la Catedral de Notre Dame ...

  11. Sunkist. Edificio Central – (EE. UU.

    Directory of Open Access Journals (Sweden)

    Albert C. Martin, Asociados

    1972-04-01

    Full Text Available Sunkist central building – (U.S.A. Architects: Albert C. Martin and Associates It consists of three floors: — the ground floor includes an auditorium, kitchen and cafeteria, a private diningroom, office area, etc.; — on the first floor are the sales department and the electronic data processing department, and — on the second floor, the firm's executive personnel department, and three kitchens for experimenting with products and developing formulas. This building was planned with the idea of reviving, by the design and the materials used, the memory and character of Old California.Consta de tres plantas: — la baja comprende: un auditorio, cocina y cafetería; un comedor privado, una zona dedicada a oficinas, etc.; — la segunda planta contiene: los departamentos de ventas y de proceso electrónico de datos, y — en la tercera planta se distribuyen: el departamento de personal ejecutivo de la empresa; y tres cocinas para la experimentación de productos y de fórmulas a desarrollar. El edificio fue proyectado pensando en que, por sus materiales y diseño, suscitase el recuerdo y el carácter de la antigua California.

  12. Edificio La Torre de Lyon – Francia

    Directory of Open Access Journals (Sweden)

    Milh, A. H.

    1973-02-01

    Full Text Available This article describes an office building composed of a two-level underground garage, a commercial main floor, sixteen office stories, and the top floor for general installations. The structure consists of pile foundations, walls and pillars of reinforced concrete, special bases and ribbed flooring structures prefabricated by the HISA system and fitted with ducts for the various installations; acoustical insulation insured by a floating base plate of the «Assour» type, in addition to special linings; curtain walls on the outside and inside partitions of the «Cloisall» type.Se trata de un edificio de oficinas, compuesto de dos sótanos de garaje, planta baja comercial, dieciséis plantas de oficinas y una superior de instalaciones. Se ha construido a base de: cimientos sobre pilotes; muros y pilares de hormigón armado; placas especiales y nervadas de forjados, prefabricadas por el sistema «HISA», provistas de conductos para el paso de las diferentes instalaciones; aislamiento acústico asegurado por una placa flotante tipo «Assour», además de revestimientos especiales; muros-cortina al exterior, y divisiones internas tipo «Cloisall».

  13. Los edificios deportivos de la Roma Antigua

    Directory of Open Access Journals (Sweden)

    Angela TEJA

    2013-11-01

    Full Text Available La educación física y el deporte retrocedió —en la Roma antigua— respecto a los ideales físico-corporales griegos. Por contra, se fomentó una notable cultura de espectáculos y divertimentos, especialmente durante la época imperial. A fin de dar cobijo a los diversos espectáculos se construyeron en la ciudad de Roma —y por mimetismo en todas las urbes del Imperio— sofisticados edificios. En efecto, además de una importante red de circos —el más emblemático de los cuales fue el circo Máximo—, se levantaron anfiteatros y termas, amén del estadio de Dominiciano. La autora pasa revista a las distintas instalaciones «deportivas» de la Roma antigua, así como a los espectáculos que albergaban: las carreras del circo, los combates de gladiadores, las cacerías de fieras, las naumaquias, sin olvidar las competiciones del estadio y la pasión romana por las termas.

  14. Actuaciones para mejorar la seguridad y calidad de los edificios

    Directory of Open Access Journals (Sweden)

    García Meseguer, Álvaro

    1980-02-01

    Full Text Available After discussing the most recent statistic on construction failures and proving that such failures occur in inverse proportion to the level of supervision applied during the various stages of the construction process, the article enters into the subjects of production control and receiving control, analyzing the evolution of both concepts in recent times. The design, materials selection, construction and maintenance stages are individually studied with indication of the weak points currently recognized in each stage. The article ends with the presentation of the modern quality assurance concept and describing the changes that can be expected in the future as the result of the new ideas in the way buildings are conceived and designed.

    Tras aludir al origen de los fallos en construcción según estadísticas recientes y demostrar que los fallos están relacionados en proporción inversa con el grado de control ejercido en las distintas fases del proceso constructivo, el artículo se extiende sobre los conceptos de control de producción y control de recepción analizando la evolución experimentada por tales conceptos en los últimos años. Se estudian después por separado las fases de planeamiento, diseño, proyecto, materiales, construcción y conservación indicándose los puntos débiles que en cada una de ellas existen hoy día. El artículo termina presentando el concepto moderno de garantía de calidad y aludiendo a los cambios que son esperables en el futuro, como consecuencia de las nuevas ideas, en la forma de concebir y proyectar los edificios.

  15. Edificio de oficinas en el paseo de recoletos. Madrid/España

    Directory of Open Access Journals (Sweden)

    Andrada Pfeiffer, R.

    1988-02-01

    Full Text Available The projected building is an attempt to respond to the problems resulting from the construction of a modern office building in a significant, characteristic and consolidated urban environment of Madrid. Among the problems considered by the authors are their relationship with the existing medium-sized buildings, as well as location (the corner of a consolidated block on the avenue-axis Castellana-Recoletos, arquitectonic language (composition of façades, and construction and construction materials (stone and glass. Therefore, the building is conceived from a plan of necessities (offices set in "landscape floors", and as an expression of its urban location, in an area whose uniqueness and importance themselves have suggested the shapes, the materials and their expression.

    El proyecto intentó dar respuesta a los problemas que plantea la construcción de un edificio moderno de oficinas en un entorno urbano muy significativo, característico y consolidado de Madrid. Se han valorado tanto los problemas de enlace con los edificios medianeros, como los problemas de situación (esquina de una manzana consolidada en el paseo o eje Castellana-Recoletos, los problemas de lenguaje arquitectónico (composición de las fachadas y los de su construcción y sus materiales (piedra y cristal. Por tanto, se concibe el edificio a partir del programa de necesidades (oficinas en "planta paisaje", como expresión de su situación urbana, en un entorno cuya singularidad e importancia, han ido sugiriendo las formas, los materiales y su expresión.

  16. Edificio principal de la E.F.G.S. - Macolin – Suiza

    Directory of Open Access Journals (Sweden)

    Schlup, Max

    1974-07-01

    Full Text Available Thirty years after the foundation of the Federal School of Gymnastics and Sports and in view of the urgent need of enlarging its installations it has been necessary to construct a new block that contained: auditoriums, projection halls, offices, gymnasium, dressing rooms, swimmingpool, etc., reserving the premises of the original building for housing and recreation rooms. The new building with metallic structure and flat roofs is situated behind the old one,, and developed along the natural slope of the ground and has curtain walls that give it a transparent look. It consists of an almost transparent storey with entrance and terrace; two further storeys with a large auditorium and library and five basements with the remaining installations of the Centre.Al cabo de treinta años de fundarse la Escuela Federal de Gimnasio y Deportes y ante ¡a necesidad imperiosa de ampliar sus instalaciones, ha sido preciso construir un nuevo bloque que albergara: aulas, salas de proyección, oficinas, gimnasio, vestuarios, piscina, etcétera, reservando los locales del edificio primitivo para zona de estancia y habitaciones. El nuevo edificio con estructura metálica y cubiertas planas está situado detrás del antiguo, rodeado de bosques y desarrollado en profundidad, a favor de la pendiente natural del terreno, ofreciendo hacia el paisaje la transparencia de sus cerramientos a base de muros-cortina. Consta de una planta casi diáfana, con entrada y terraza; dos plantas altas con aula magna y biblioteca y cinco semisótanos con las demás instalaciones del Centro.

  17. Edificio de los Tribunales Municipales - Valle de San Gabriel, Los Ángeles - California (EE. UU.

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1976-04-01

    Full Text Available The most outstanding feature of this construction are the columns of the main facades which are formed by big prefabricated concrete members and which cover the entire height of the four story structure. The Southern facade is protected from the direct sunlight by means of long prefabricated vertical elements. The building is crowned with a large crobel which is supported by the columns. The space of the four storeys is distributed in the following manner: courtrooms, judges chambers and jury assembly; facilities for the district attorney, the public defender and the marshal; rooms for the court reporters; waiting rooms for the witnesses and premises for the accused. The general planning is such that the court rooms separate the private sector from the public one, at the same time as they are connected with the judges chambers and jury assembly. The interior features have a sober elegance in keeping with the function of the building. The construction is completed by a large parking space and gardens. OEl rasgo más sobresaliente de esta construcción son las columnatas de las fachadas principales, formadas por grandes elementos prefabricados de hormigón que cubren las cuatro plantas de altura del edificio. En la fachada sur, el peristilo se completa con largos partesoles verticales, también prefabricados, que protegen de la luz solar directa. En la parte superior el edificio culmina en un amplio voladizo apoyado sobre las grandes columnas. En el interior de las cuatro plantas se han distribuido: salas para los tribunales; dependencias destinadas a los jueces y jurados; locales para el fiscal, el abogado y el jefe de policía; salas para periodistas; salas de espera para los testigos, e instalaciones para los acusados. La organización general es tal que las salas de las audiencias separan la zona pública de la privada, quedando, al mismo tiempo, enlazadas con las salas de los jueces y de los jurados correspondientes. En la decoraci

  18. Propuesta de la certificación energética, mediante simulación dinámica, como herramienta de gestión energética ISO 50001 Versus auditoria energética en edificios.

    OpenAIRE

    Rey Hernández, Javier María; Rey Hernández, Alberto; Velasco, Eloy; San José, Julio; Rey Martinez, Francisco Javier

    2017-01-01

    Producción Científica El objetivo es el estudio de la gestión energética ISO 50001, mediante las herramientas de sistema de gestión tales como la auditoría energética y compararlo con la certificación energética mediante simulación dinámica, aplicadas a un edificio universitario estándar. La metodología empleada para alcanzar unos resultados de ahorro y eficiencia energética, aplicados a un edificio universitario, pretenden servir de modelo para poder extrapolarlos a edificios que compo...

  19. Instalación en un edificio de oficinas

    OpenAIRE

    Oromí Seijo, Arturo

    2017-01-01

    El presente proyecto teórico trata de trabajar sobre la elaboración de unos diseños de un edificio de oficinas de 5 plantas situado en Barcelona en las que tendrá 85 trabajadores y en las que se dotará al edificio de una instalación solar térmica para producir agua caliente sanitaria (A.C.S) y se diseñara y dimensionara para poder cubrir la demanda necesaria en medida de lo posible. La primera parte del proyecto será situar el edificio de oficinas y diseñar la distribución de cada planta p...

  20. Edificio circular de oficinas Arcis-Sur-Aube – Francia

    Directory of Open Access Journals (Sweden)

    Bayonne, Philippe

    1972-10-01

    Full Text Available This building has a very particular shape, as a result of the following ideas, which conditioned the initial project: — It was sought to integrate the whole staff within a single zone to give them a closer mutual relationship. — Seek to avoid the classical design, of broken up spaces, with many internal partitions, corridors and doors. — The building to operate as a control tower over the general activity of the whole works. — On the ground level, to have an additional free space for the storage of beet, during the harvesting period. In general terms the building consists of a circular stem, of reinforced concrete, housing the lift and stairs. Around it the office flooring structure is cantilevered, from this single support. The building is completed with a truncated cone roof, which houses, on two floor levels, the records rooms. The most important problems were the construction of the flooring reinforcement work and the formwork for the external surfaces. The first difficulty was overcome by means of four double girders, placed orthogonally, in couples, supported on the stem periphery; whilst the second was solved by using plywood on transversal and radial framework.Se trata de una construcción de forma muy particular, como consecuencia de las siguientes ideas que sirvieron de base para el proyecto: tender hacia una solución colectiva que, reuniendo al personal técnico bajo un mismo polo, les confiriera una más estrecha relación; huir de la solución «clásica » de plantas quebradas, con profusión de divisiones interiores, pasillos y puertas; función de torre de control sobre la actividad general de la fábrica, y disponer, al nivel del terreno, de superficie libre adicional para el almacenaje de remolacha en las épocas de recogida. El edificio en líneas generales consta de un fuste circular, central, de hormigón armado, que aloja en su interior al ascensor y a la escalera. En su periferia se apoya el forjado de la planta

  1. Las construcciones con esqueleto en madera

    Directory of Open Access Journals (Sweden)

    Heinz Leser S.

    1984-06-01

    Estos sistemas se emplean preferentemente en viviendas prefabricadas y edificios de pequeña envergadura. Finalmente, consideramos las construcciones con "esqueleto en madera", cuyo campo de aplicación principal está en las edificaciones de mediana extensión: escuelas, centros comunitarios, pequeñas industrias o bloques habitacionales.

  2. Reto Europeo: la Eficiencia Energetica en Edificios. La Nueva Directiva Comunitaria 31/2010

    Directory of Open Access Journals (Sweden)

    Fernández, Pablo Sandoval

    2011-08-01

    Full Text Available Abstract: The new European Directive2010/31 is trying to achieve a 20%reduction in greenhouse gas emissionsbellow 1990 levels, and by 30% in theevent of an international agreementbeing. The E.U. has a major goal to reduceour oil dependency and use morerenewable energy, especially in buildingswhere 40% of the total energy consumptiontakes place. The Directive wants toestablish a plan to achieve our goal tocompletely reduce the use of energy inbuildings by 2020. The new buildingsoccupied and owned by public authoritiesmust comply with the proposed regulationby 2018 to serve as an exampleto the private sector. By increasing renewableenergy sources the goal is to reducethe Greenhouse effect since we arealready noticing it in our daily lives andcontinuing being the global and multilateralengine of the policies against theClimate Change.Resumen: La nueva Directiva Comunitaria31/2010 pretende la consecución de una reducciónde los gases de efecto invernadero en un20% con respecto a 1990, que podría incrementarseen un 30% si existe un compromiso internacional.La UE se ha marcado como objetivo lasustitución del empleo de combustibles fósilespor energías renovables y una mayor eficienciaenergética, especialmente en los edificios dondese consume el 40% del total de energía de la UE.Esta Directiva establece la obligatoriedad de losEstados miembros de adoptar políticas y planespara conseguir que los edificios de nueva construcciónsean de consumo de energía nulo en el2020. Los edificios de titularidad pública deberánadelantarse al 2018 en dicho objetivo comopapel ejemplarizante que toda Administracióndebe jugar. Con este paso y con una sustituciónprogresiva del empleo de combustibles fósilespor energías renovables, la UE pretende mitigarlos graves efectos del calentamiento global, queya empezamos a notar en nuestra vida cotidiana,y continuar siendo el motor global y multilateralde las políticas contra el Cambio Climático.

  3. Automatización o control: La percepción de los usuarios de edificios de oficinas inmóticos

    Directory of Open Access Journals (Sweden)

    Silvia Hernández

    2012-12-01

    Full Text Available La crisis energética mundial sumada a indicadores internacionales de confort para edificios de oficinas requiere de diseñadores de edificios domóticos que logren espacios de trabajo de alto rendimiento, con confort efectivo y con eficiencia energética, incluyendo pautas de diseño sustentable. En este artículo se presenta un estudio de casos de edificios inmóticos de oficinas de clima templado, en la zona central de Córdoba, Argentina. Se realizaron encuestas postocupación -EPO-, haciendo énfasis en el área de los sistemas inmóticos; ambiental, seguridad e iluminación. Del mismo modo, se requirió la opinión del usuario respecto de su relación con la inmótica, y la posibilidad de accionar o intervenir en los sistemas para alcanzar las mejores situaciones de confort. Se consideraron distintos sistemas y sus prestaciones con el objetivo de determinar los modos de relación entre sujeto activo y pasivo. Se concluye que para lograr el confort en las oficinas inmóticas se debería contemplar desde el diseño la actitud crítica de los usuarios y su voluntad manifiesta de cambiar las condiciones de confort que le han sido determinadas, considerando la inclusión de más interfaces gráficas.

  4. ALGORITMO PARA EL ANÁLISIS PROBABILÍSTICO EN SISTEMAS DE DISTRIBUCIÓN CON GENERACIÓN DISTRIBUÍDA

    Directory of Open Access Journals (Sweden)

    CESAR AUGUSTO PEÑUELA MENESES

    2011-01-01

    Full Text Available Este artículo presenta un algoritmo eficiente para el análisis probabilístico de sistemas de distribución trifásicos desbalanceados con conexión de generadores distribuidos (sistemas levemente enmallados. Este algoritmo hace uso de la técnica del Método Estimado de Dos Puntos para el cálculo del comportamiento probabilístico de las variables aleatorias del sistema. Adicionalmente, y con el fin de explotar eficientemente las características topológicas de la red, el análisis determinístico de las variables de estado es realizado por medio de un Flujo de carga Radial Basado en Compensación (FCRBC. Para el tratamiento de la generacióndistribuida, se propone una estrategia para incorporar dentro del FCRBC un modelo simplificado del generador junto con un control de las variables de despacho en el punto de conexión con la red. De este modo, el nodo con generación distribuida puede ser modelado como un nodoPV, o nodo PQ, dependiendo del modo de control y de las condiciones operativas del generador. Para validar la eficiencia del algoritmo propuesto es usado el sistema de prueba IEEE de 37 nodos. Los resultados probabilísticos son comparados con los obtenidos usando el método de Monte Carlo.

  5. NO-DO: Archivo y secuestro de la imaginación

    Directory of Open Access Journals (Sweden)

    Enrique Fibla Gutiérrez

    2015-02-01

    Full Text Available Este artículo postula la necesidad de una nueva concepción de lo público digital en lo que a archivos audiovisuales se refiere. En lugar de pensar únicamente en la cuestión del acceso, se plantea también la inclusión del uso creativo del archivo como condición indispensable para la participación ciudadana en la institución del imaginario colectivo.Como objeto de estudio se ha escogido el NO-DO, pieza fundamental para entender la relación entre poder e imaginario en la sociedad española. El hecho de que se permita su visualización por streaming, pero no su libre descarga plantea una serie de interrogantes sobre lo público digital y la relación entre poder y archivo hoy, cuestiones que serán desgranadas a lo largo del artículo, aportando ejemplos de qué sucede cuando el archivo permite lo que Cornelius Castoriadis llamó "El imaginario radical instituyente".

  6. Edificio para ambulatorio San Francisco – (EE. UU.

    Directory of Open Access Journals (Sweden)

    Reid, John Lyon

    1976-12-01

    Full Text Available The 50,470 m2 the total area of the hospital is distributed as follows: 18,900 m2 for the 22 main clinics and for the additional clinics; 2,770 m2 for complementary activities; and the remaining 28,800 m2 for a parking lot with space for 700 cars. The building occupies a site that slopes strongly towards the north across which runs the pedestrian access from one of the circumference roads to the main façade; the access road for the vehicles leads to the back facade, where the natural slope of the ground has been taken advantage of to build the 5 storey parking building. The two main functions —the clinics and the parking house— are conveniently separated though connected with each other by means of corridors and lifts. The interior design of the clinics is very flexible so as to allow for further enlargements. The patients' waiting rooms are provided with a glazed façade and have a beautiful view over the San Francisco Bay and its surroundings. The construction is entirely of concrete and its structure is calculated ín such a manner as to allow for two additional storeys.Cuenta con una superficie total construida de 50.470 m2, repartidos de la siguiente forma: 18.900 se destinan a la distribución de 22 clínicas principales y otras secundarias; 2.770 a locales de actividades complementarias; y el resto, 28.800 m2, a aparcamiento con capacidad para 700 plazas. El edificio ocupa una parcela fuertemente inclinada hacia el norte, inclinación que permite el acceso peatonal a la clínica, por la fachada principal, desde una de las avenidas perimetrales; y el vehicular, por la fachada posterior, en donde, aprovechando el desnivel del terreno, se han organizado las cinco plantas del aparcamiento. Las dos funciones principales —clínicas y aparcamiento— se hallan convenientemente separadas, estableciéndose el enlace entre los distintos niveles mediante ascensores que relacionan las clínicas, el centro médico, los aparcamientos

  7. Proyecto estructural de edificio industrial de 1500m2 destinado a uso logístico, situado en el poligono L'Espartal (Jijona)

    OpenAIRE

    ESTEVE GIL, ALFONSO

    2016-01-01

    [ES] En este trabajo, el alumno realizará el proyecto estructural de una nave industrial sencilla, con tipología estructural a dos aguas, situada en un polígono industrial. Esteve Gil, A. (2016). Proyecto estructural de edificio industrial de 1500m2 destinado a uso logístico, situado en el poligono L'Espartal (Jijona). http://hdl.handle.net/10251/69514. TFGM

  8. 2 obras de Fisac en Madrid: Edificio «Vega» para oficinas y vivienda unifamiliar en Somosaguas

    Directory of Open Access Journals (Sweden)

    Fisac, M.

    1967-11-01

    Full Text Available 2 Buildings by M. Fisac «Vega» office building in Madrid This aesthetically thought out building is eminently urban, with natural gardens and no enclosing fences or artificial obstacles separating the site from the street. The «Vega» building comprises a central block, with the vertical communications, including stairs and three lifts, and and three wings that correspond to the triangular shape of the site. The basic constructional mediiun, which has been very wisely used, both for the paraments and flooring, is untreated reinforced concrete. Single family dwelling at Somosaguas, Madrid The various zones of the building have been planned mainly in relation to their orientation, so that the living zone faces to the South, and the bedrooms are on the East. Also, the separate parts of the building are situated at various levels, to have as much sunshine as possible, and achieve optimum adaptation to the site profile. The garden is also planned on multiple levels in accord with the ground topography. In this building, too, untreated concrete has been adopted almost exclusively, together with precast units and granite stone.Edificio «Vega» para oficinas, en Madrid Estéticamente concebido con un carácter eminentemente urbano, con ajardinamientos libres, sin vallas ni obstáculos a las calles colindantes, dicho edificio «Vega» está compuesto: — por un nudo central, en el que están situados los enlaces verticales: una escalera y tres ascensores; — y tres ramas que corresponden a los tres vértices del triángulo del solar. El material fundamental y sabiamente empleado en estructura y forjados, es el hormigón armado visto. Vivienda unifamiliar en Somosaguas, Madrid La composición de las distintas ZONAS del edificio se ha hecho atendiendo, principalmente, a las características de vistas y orientación, quedando, a mediodía, la zona de estar, y a saliente, la de dormitorios. Asimismo, las diversas partes del edificio aparecen

  9. Análisis y mejoras en el sistema de climatización en edificio de oficinas en Alicante

    OpenAIRE

    VERA CARBONELL, JENARO

    2017-01-01

    El objetivo del proyecto es estudiar y proponer posibles mejoras para minorar el consumo eléctrico del sistema de acondicionamiento térmico que, actualmente, esta instalado en un edificio de oficinas del Instituto Nacional de la Seguridad Social en Alicante que más tarde describiremos y ubicaremos con más precisión. Para este análisis disponemos del proyecto de reforma de la instalación de climatización [20] que se redactó en el año 2013. Como objetivo secundario se anali...

  10. Construcción de un edificio bajo la figura del fideicomiso en Mar del Plata, en 2008

    OpenAIRE

    Fagioli, Francisco

    2008-01-01

    Se desarrolló el caso particular de la construcción de un edificio de departamentos en la ciudad de Mar del Plata proponiendo la implementación de la figura del Fideicomiso y se analizaron las ventajas que ello representa para los Fiduciantes. El proyecto incluyó un análisis del mercado y comercialización de los servicios, la viabilidad técnica y la de gestión, la enumeración de inversiones y los requisitos necesarios para cumplir con las legislaciones vigentes, el análisis ...

  11. Edificio para viviendas «Point Royal», en Bracknell, Berkshire, Inglaterra

    Directory of Open Access Journals (Sweden)

    Arup Associates, Arquitectos

    1966-05-01

    Full Text Available A tall building, containing 102 flats, has been built near Bracknell, in Britain. These flats are intended for single people and childless couples. Significant features of this building are: the planform, the garage situated on the ground floor, and the approaches to the building. The siting of the building is most charming, and this is enhanced by the impressive external quality of the untreated concrete surfaces.Ha sido construido en los alrededores de la ciudad de Bracknell, Inglaterra, un bloque—tipo torre—con un total de 102 viviendas, destinadas para solteros y matrimonios sin hijos. Es de señalar en el mismo: la forma de su planta, las soluciones dadas al garaje existente en su nivel inferior y a los accesos al edificio, así como la belleza de su emplazamiento y la plástica de tratamiento, a base de hormigón armado visto, de sus alzados.

  12. El poder de la estructura: edificio BBK Paraninfo

    Directory of Open Access Journals (Sweden)

    Losada, R.

    2012-06-01

    Full Text Available The most recently work of Álvaro Siza, in Spain, shows us the merits of the structural system in the composition of its forms and spaces, its overhangs and the movement in the alignment of its façades; the creation of the architectonic space and its envelope. The BBK Auditorium consists of a structural system of layered walls, mixed structural slabs (steel, concrete and reinforced concrete slab foundations on augercast piles. The position and dimensions of the spaces with no intermediary supports and the characteristics of the overhangs create discontinuous transmission of actions, which require strong reinforcements in limited sections of the concrete, implying complexity in its execution and performance in response to concrete shrinkage. Architecturally, the structure goes entirely unnoticed in the architecture, characterized by its visual simplicity within an intricate spatial and constructive arrangement, where the nuances of natural light play a basic role in the definition of the spaces.

    La última obra terminada por Álvaro Siza en España permite reflexionar sobre el valor del sistema estructural en la composición de formas y huecos, de vuelos y los movimientos de alineación de fachadas; en suma, de la creación del espacio arquitectónico y su envolvente. El edificio BBK Paraninfo muestra un sistema estructural de láminas – muro, con forjados de estructura mixta (acero – hormigón, cimentación de losa de hormigón armado sobre pilotes barrenados. La posición y dimensiones de huecos sin apoyos intermedios y las características de los vuelos dan lugar a una discontinuidad de transmisión de acciones, que requieren fuertes armaduras en secciones limitadas de hormigón, comportando una complejidad de ejecución y actuación frente a retracciones del hormigón. Arquitectónicamente, la estructura pasa totalmente desapercibida en una arquitectura caracterizada por su simplicidad visual, complejidad

  13. El «Edificio Central» en las Palmas de Gran Canaria – España

    Directory of Open Access Journals (Sweden)

    Ruiz Duerto, A.

    1972-11-01

    Full Text Available A description is given of the program, characteristics, and building solutions for this unique building, situated in downtown Las Palmas. The building complex is composed of two underground levels for parking, a ground-floor and mezzanine for commercial purposes, and open plaza with swimming pool, dressing rooms, cafeteria, restaurant, dance spot, playground, and a block of 15 floors containing 137 apartments of varying size arranged so as to minimize sun overexposure and maximize privacy. The structure is of reinforced concrete and lightweight slabs, and enjoys quality fixtures which assure excellent functioning.Se describe el programa, características y solución constructiva de este edificio singular, situado en el centro cívico de Las Palmas de Gran Canaria. Se compone de: — dos plantas de sótano para estacionamiento de vehículos; planta baja comercial; — entreplanta comercial; — planta libre ajardinada con piscina, vestuarios-aseos, cafetería, restaurante, club de baile, juego de niños, guardería, etc.; — un bloque de 15 plantas con 137 apartamentos, de superficie variada, y dispuesto de forma que evite perjuicios de soleamiento y vistas a los edificios circundantes. Estructura de hormigón armado y losas aligeradas, con toda suerte de instalaciones que aseguren su perfecto funcionamiento.

  14. Edificio de viviendas, locales comerciales y oficinas - Las Palmas, Gran Canaria

    Directory of Open Access Journals (Sweden)

    López Díaz, -

    1979-08-01

    Full Text Available This building stands on a square plot, between party walls, in a narrow old city street. The ground and basement levels are used for commercial spaces, the next levels above for office space and the last three upper levels for apartments, plus a setback penthouse. Each apartment, consisting of living-dining room, services and four double bed-rooms, is layed out lengthwise along a line perpendicular to the Street front, so as to better use the narrow available space, while the natural lighting and ventilation of the inner rooms is achieved by means of numerous shafts distributed throughout the surface. The building features reinforced concrete structure and special concrete panel partitions. The façade combines the same concrete panels, faced with ceramic tiles, with large aluminium windows and artificial, modular shaped, window sills and spandrels.

    En una parcela cuadrada, situada en una estrecha calle de la ciudad, se ha levantado este edificio entre medianerías que destina la planta baja y el sótano a locales comerciales, los dos niveles siguientes a oficinas y a viviendas las tres plantas superiores y el ático retranqueado. Cada vivienda —compuesta por estar-comedor, zona de servicio y cuatro dormitorios dobles— se desarrolla en sentido longitudinal, perpendicularmente a la calle, a fin de aprovechar la escasa fachada del edificio, obteniéndose la iluminación y ventilación naturales de las dependencias interiores mediante pequeños patios diseminados en la superficie. La construcción emplea estructura de hormigón armado y tabiquería constituida por piezas especiales de hormigón. En la fachada se combinan las mismas piezas de hormigón revestidas con plaquetas cerámicas, con grandes ventanales de aluminio y antepechos de piedra artificial de conformación reglada.

  15. Piscina cubierta integrada en un conjunto de edificios Victorianos - Gran Bretaña

    Directory of Open Access Journals (Sweden)

    Idelberger, K.

    1980-02-01

    Full Text Available This modem building, housing an in-door swimming pool, blends-in beautifully with the adjacent mid-nineteen Century Victorian railway station. The building has two floors; the ground floor with a 12 X 7 m wading pool, a 25 X 12.5 m competition pool and dressing rooms, while the upper floor houses the lockers, management office, cafeteria, etc. and a terrace enjoying magnificent views. The steel structure was designed avoiding the sternness of modern functionalism in an attempt to make it compatible with architectural environment,

    Se presenta un edificio moderno, dedicado a piscina cubierta, muy bien encajada con la inmediata estación victoriana de mediados del siglo XIX. Consta de dos plantas: inferior con piscina de no nadadores, de 12 X 7 m, vestuarios y piscina de competición, de 25 X 12,50 m; la planta superior alberga las taquillas, dirección, administración, cafetería, etcétera con una terraza desde la que se disfrutan vistas magníficas. La estructura es metálica y se ha procurado quitarle monotonía, a fin de conjugar el modernismo y funcionalidad, con el entorno no paisajístico y arquitectónico.

  16. Edificio de viviendas. Lake Meadows Chicago

    Directory of Open Access Journals (Sweden)

    Skidmore - Owings y Merrill, Arquitectos

    1958-09-01

    Full Text Available "Lake Meadows" es una amplia parcela, de cuatrocientos mil metros cuadrados, situada en las afueras de Chicago, con vistas dominantes sobre el lago Michigan. En tan bello emplazamiento se ha construido uno de los más atractivos conjuntos residenciales norteamericanos.

  17. Protecciones solares y su implicancia en la demanda energética: caso edificio público en Concepción, Chile

    Directory of Open Access Journals (Sweden)

    Jazmín Jara Córdova

    2013-06-01

    Full Text Available Determinar las ganancias solares en el vano-ventana con protecciones solares y analizar el comportamiento térmico en un edificio es un tema relativamente nuevo en el ámbito chileno. No obstante, el inadecuado manejo del control solar, en algunos casos, genera problemas de sobrecalentamiento al interior de la edificación. Esta investigación busca establecer un procedimiento que permita evaluar cuatro tipos de protecciones solares y analizar sus implicancias energéticas en un edificio público, cuya infraestructura utilizada se justifica en el desconocimiento de nuevas exigencias que hará el Estado para este tipo de edificación. Para el caso de estudio se han determinado 37 escenarios con distintos factores solares modificados, definidos a través de cálculo manual, los cuales son evaluados bajo simulación dinámica (TAS. En primera instancia se analiza el comportamiento de dos recintos y posteriormente se obtienen los resultados en relación con la demanda energética del edificio. Las protecciones solares utilizadas (voladizos, retranqueo, lamas horizontales y verticales reducen la demanda de refrigeración de un 52 a 73% (aumentando la demanda de calefacción, sin embargo la demanda energética total (calefacción y refrigeración disminuye de un 24 a 31%.

  18. Metodología y herramienta VERDE para la evaluación de la sostenibilidad en edificios

    Directory of Open Access Journals (Sweden)

    Macías, M.

    2010-03-01

    produce la operación del edificio y la fabricación de los materiales de construcción sobre el medioambiente natural. Durante esta misma década los problemas de la pobre calidad del aire interior y la inadecuada ventilación en edificios herméticos (síndrome del edificio enfermo constituyen una preocupación creciente en los ciudadanos. Gradualmente ha habido un incremento en el consenso en relación con el tipo impactos que deben incluirse en un modelo de evaluación verde. Desde el año 2000, el número de métodos para la evaluación medioambiental de edificios en el mundo se ha multiplicado considerablemente. BREEAM (BRE Environmental Assessment Method fue el primer sistema (aparecido en 1990 que ofreció un método de etiquetado de edificios aunque LEED (Leadership in Energy and Environmental Design es el de mayor implantación en el mercado de grandes edificios. Actualmente existe un gran número de modelos, muchos de ellos basados en la metodología desarrollada por el grupo GBC (Green Building Challenge, actualmente iiSBE (International Initiative for a Sustainable Built Environment. En este trabajo se presenta una nueva metodología y un modelo de evaluación de la sostenibilidad de edificios denominado VERDE, basado en la cuantificación de la reducción de impactos.

  19. Impregnación de la perovskita La0.8Sr0.2Cr0.5Mn0.5O3-δ como ánodo en celdas SOFC

    Directory of Open Access Journals (Sweden)

    José Juan Alvarado Flores

    2015-09-01

    Full Text Available Se han sintetizado a través del método sol-gel, y caracterizado por varias técnicas, nuevos compósitos tipo perovskita de La0,8Sr0,2Cr0,5Mn0,5O3-δ (LSCM, utilizando cobre (XCu; X = 25, 35 y 45% como aditivo formador del cermet LSCM + Cu para utilizarse como ánodos alternativos en celdas de combustible de óxido sólido de temperatura intermedia (IT-SOFC. Se confirma por difracción de rayos X (XRD la formación de fase de los cermets LSCM-Cu. La conductividad eléctrica obtenida desde temperatura ambiente hasta 800 °C indica la presencia de 2 tipos de comportamiento tanto semiconductor como metálico. Cuando la concentración de Cu fue del 25 y del 35%, el comportamiento que dominó fue del tipo semiconductor. La determinación de los coeficientes de expansión térmica (TEC mostró una dependencia lineal inversamente proporcional a la concentración de Cu. Nuestros resultados de conductividad eléctrica, análisis morfológico y TEC sugieren que los ánodos con 25 y 35% de Cu tienen la mayor posibilidad para aplicarse en las celdas tipo SOFC-IT.

  20. Eficiencia isoterma de los modelos de ventilación exterior en patios de edificios residenciales. Estudio de casos

    Directory of Open Access Journals (Sweden)

    Padilla-Marcos, M. A.

    2015-12-01

    Full Text Available Many buildings have been designed and built with courtyards to supply the light and healthy air demands to the dwellings. However, confined air quality in many of them is unhealthy for human use due to the diminished ability to renew the air. The purpose of the study is to catalog different models of isolated building courtyards under isothermal conditions, according to their dimensions. The goal is to quantify the efficiency of air exchange in each model and analyze the influence of size in controlled external conditions. In addition, current regulations in Spain are compared with the obtained results. In conclusion, the efficiency of ventilation ratio for courtyards in buildings depends on its design.Muchos edificios han sido diseñados y construidos con patios interiores para satisfacer exigencias de habitabilidad, ya que estos espacios surten de luz y aire a los locales interiores. Sin embargo, la calidad del aire confinado en muchos de ellos es insalubre para el uso humano debido a la mermada capacidad que tienen para renovar su aire. El propósito del estudio es catalogar diferentes modelos de patio interior en edificios aislados, en condiciones isotermas, según sus dimensiones. El objetivo consiste en cuantificar la eficiencia en la renovación del aire en cada modelo y analizar la influencia de sus dimensiones en unas condiciones externas controladas. Adicionalmente, se comparan las normativas vigentes en España con los resultados así obtenidos. Como conclusión se determina la razón de cómo dicha eficiencia de la ventilación de patios interiores de los edificios desciende en función de su diseño.

  1. Para una hermenéutica del Concilio Vaticano II: Desde 1965 hasta el Sínodo de 1985

    OpenAIRE

    Saverio-Venuto, F. (Francesco)

    2013-01-01

    Aggiornamento, reforma, ruptura, revolución, continuidad, discontinuidad son algunas de las categorías conceptuales del debate hermenéutico en torno al Concilio Vaticano II. La recepción del concilio ha venido determinada por las diversas interpretaciones que de él se han hecho. En el artículo se examinan las hermenéuticas que han alimentado el debate entre 1965, año de la clausura del concilio y 1985 en que se celebró el sínodo Extraordinario a los veinte años del concilio. Este periodo se s...

  2. Tratamiento de disoluciones que contienen cromo hexavalente mediante electrocoagulación con ánodos de hierro

    OpenAIRE

    ARROYO NÚÑEZ, MARÍA GUADALUPE

    2011-01-01

    Los residuos de cromo hexavalente y sus compuestos se originan en industrias tales como la fabricación de coches, el refino del petróleo, el tratamiento de superficies, la preparación de cromato, las industrias de fertilizantes y las industrias que emplean componentes de Cr(VI) como inhibidores de la corrosión. Los compuestos derivados del Cr(VI) son muy contaminantes, tienen un efecto altamente oxidante y facilidad para penetrar en membranas biológicas, además de ser cancerígenos para los...

  3. L'interazione edificio-città / The interaction between the building and the city

    Directory of Open Access Journals (Sweden)

    Carlo Gandolfi

    2014-01-01

    Full Text Available Per Niemeyer l'architettura è un tutt'uno con la città e il territorio. Tema cruciale per analizzare questa relazione sono le modalità attraverso le quali separa l'edificio dallo spazio aperto e dalla città. Ci troviamo di fronte ad una ricerca che supera di molto la semplice evoluzione di Le Corbusier e la semplice capacità scultorea che gli è stata attribuita: quella di Niemeyer è una composizione di grande respiro, in continua evoluzione e tensione con la città e con il paesaggio. / For Niemeyer architecture is a whole with the city and the territory. The ways through which he separates the building from the open space and from the city are a crucial issue to analyse this relationship. We find ourselves in front of a research that superates by far the simple evolution of Le Corbusier and the simple sculptural ability that was attributed to it: the one by Niemeyer is a wide breath composition, with an ongoing evolution and tension with the city and the landscape.

  4. Ampliación de un edificio de oficinas – Hamburgo - Alemania Federal

    Directory of Open Access Journals (Sweden)

    Schramm, Jost

    1976-12-01

    Full Text Available This construction consisting of 5 storeys plus attic is an enlargement of an already existing office building. As a consequence this old building has been entirely remodeled and only the heavy work and the classic facade have been maintained. The main premise was that of unifying the functions and spaces of the two buildings. With regard to the structure this implied the same floor height for the old as well as the new building.; and with regard to the interior, the use of the same materials and construction systems for the lining of the ground surfaces and the conditioning of ceilings as well as sharing of the vertical communication nuclei in addition to the sanitary installations. The idea of achieveing a unified complex was carried out as far as possible; thus, the centralized heating and ventilation installations are being shared, as are also the electrical, lighting and telephone systems. The complex that combines the two different exterior architectural styles in a harmonious manner is further completed with a 23-car parking place which occupies the left over area of the plot.El edificio consta de 5 plantas y ático, para ampliar otro existente destinado a oficinas. Este hecho ha traído como consecuencia la total remodelación de la construcción antigua, en la que únicamente se han mantenido la obra gruesa y su fachada de aspecto clásico. La premisa principal fue unificar las funciones y los espacios de ambos edificios. Esto se traduce, en lo que se refiere a la estructura, en que la altura de forjados del nuevo edificio viene definida por la de los del antiguo; y en cuanto al tratamiento interior, en la utilización de los mismos materiales y sistemas constructivos para el revestimiento de suelos y acondicionamiento de techos, así como en el compartir las zonas de servicio y los núcleos de comunicaciones verticales. La consecución de un conjunto unificado se llevó hasta sus últimas consecuencias; y así, también son

  5. Investigación e impacto ambiental de los edificios. La energía

    Directory of Open Access Journals (Sweden)

    Rodríguez Aumente, Pedro A.

    2005-08-01

    Full Text Available This conference describes the main problems of energy use in face of the depleting of fosil resources, energy supply and emission of atmospheric toxic gases, green house effect gases and ozone depleting gases. The relevance of energy consumption in the environment impact is commented, as well as the key points for the posible evolution of the problem and in the appropriate technology research to cope with them In order to improve the energy and ecological efficiency of buidings. The main characteristics of present day technologies for the introduction of renewable energies in buidings are comented, dealing with their barriers for the widespread use. The most recent research on air conditioning using thermal solar energy with absorption machines is described, with application to Madrid.Se presenta la problemática actual del uso de la energía de cara al agotamiento de las fuentes fósiles, el abastecimiento y la contaminación atmosférica de gases tóxicos, de efecto invernadero y destructores de la capa de ozono. Se comenta la relevancia de la energía en el impacto ambiental de los edificios y se discuten los distintos aspectos que inciden en la posible evolución futura del problema y en la mejor estrategia de investigación tecnológica para tratar de mejorar la eficiencia energética y medioambiental de los edificios, especialmente en España. Se presentan las tecnologías actuales de introducción de las energías renovables en los edificios y se comentan sus más relevantes características, haciendo hincapié en las barreras para su difusión. Se describe la actividad más reciente de investigación en la climatización por energía solar haciendo uso de máquina de absorción, con aplicación a Madrid.

  6. Potential of bioclimatic architecture for energy saving in buildings; Potencial de la arquitectura bioclimatica para ahorro de energia en edificios

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Chavez, Jose Roberto [Universidad Autonoma Metropolitana-Azcapotzalco, Mexico, D. F. (Mexico)

    1994-12-31

    The design and construction of current buildings has been characterized, most of all, in the last 30 years, for the lack of consideration in the design process of aspects that nowadays represent a fundamental importance. These aspects are related to energy conservation and environmental protection, with man as the main center of attention for the optimum satisfaction of its physiological as well as psychological needs. In this paper are presented the causes for the lack of consideration of the mentioned aspects and guidelines to follow are set forth for their integration in the design process. Also the architecture potential with a bioclimatic approach is analyzed, for energy saving in buildings. [Espanol] El diseno y construccion de edificios contemporaneos se ha caracterizado, sobre todo en los ultimos treinta anos, por la falta de consideracion en el proceso de diseno, de aspectos que hoy en dia revisten una importancia primordial. Estos aspectos se relacionan con la preservacion de la energia y del medio ambiente, teniendo al hombre como principal centro de atencion, para la satisfaccion optima de sus necesidades, tanto fisiologicas como psicologicas. En este trabajo, se presentan las causas de la falta de consideracion de los aspectos antes citados y se plantean las pautas a seguir para su integracion en el proceso de diseno. Asi mismo, se analiza el potencial de la arquitectura con un enfoque bioclimatico, para ahorro de energia en los edificios.

  7. Intelligent buildings vs. bioclimatic design; Edificios inteligentes vs. diseno bioclimatico

    Energy Technology Data Exchange (ETDEWEB)

    Aguayo Gonzalez, Ricardo [Tecnologico de Monterrey (Mexico)

    2006-10-15

    Present the form of intelligent buildings designing is the article purpose. Those kinds of edifications take advantage of climatic conditions which allow the users comfort and the efficient electric power use, avoiding the polluting agents. It also shows the four next following stages to design an intelligent building to know: the dry weather and relative dampness schedule variations during a year in the building location; the predominant winds direction, intensity and schedule frequency; the cloudiness, rain, etc and how to use the Givoni diagram to obtain the natural air-conditioning strategies and reach the thermal comfort. [Spanish] El proposito de este articulo es presentar la forma de disenar edificios Inteligentes, los cuales aprovechan las condiciones climaticas que permiten el confort de los usuarios y el uso eficiente de la energia electrica, evitando asi la emision de agentes contaminantes. Tambien menciona los siguientes cuatro pasos para el diseno de un edificio inteligente: conocer las variaciones horarias de temperatura seca y humedad relativa durante un ano en el lugar donde estara el edificio, saber la direccion, intensidad y frecuencia horaria de los vientos dominantes, tener conocimiento de la nubosidad, lluvia, etc. y utilizar el diagrama de Givoni para obtener las estrategias de climatizacion natural para obtener el confort termico.

  8. Edificio de «La Caixa» Madrid – España

    Directory of Open Access Journals (Sweden)

    Bosch Aymerich, José M.

    1980-10-01

    Full Text Available This eight-storey building, for «La Caixa», occupies a city block on the downtown avenue of Paseo de la Castellana in Madrid. The lower floors have cants on their four corners, which fade away gradually giving the building a more original note. All of the floors are developed about a central core, and the lower floors are to be used for «La Caixa» needs. The foundations were carried out on the basis of reinforced concrete piles. Metal pillars were used for the structure, and the flooring system was on the basis of a continuous reinforced slab. The exterior of the building was executed in the form of an aluminium curtain wall, with finishing touches in a U shape which break up the glazed surface.

    Este edificio de ocho plantas, destinado a «La Caixa», ocupa una manzana en el céntrico Paseo de la Castellana de Madrid. Las plantas Inferiores presentan chaflanes en sus cuatro esquinas, los cuales van desapareciendo progresivamente ganando así el edificio en originalidad. Todas las plantas, de las cuales las inferiores están destinadas al servicio de «La Caixa», se desarrollan en torno a un núcleo central. La cimentación se realizó a base de pilotes de hormigón armado. Para la estructura se emplearan pilares metálicos y el sistema de forjado a base de una losa continua armada. Se adoptó para las fachadas la solución de un muro cortina de aluminio, con remates en forma de U que cortan la superficie acristalada.

  9. Dos edificios administrativos, en San Francisco

    Directory of Open Access Journals (Sweden)

    Skidmore, Owings & Merrill, Arquitectos

    1964-07-01

    Full Text Available The Crown Zellerbach has been built on a large triangular plaza, at the outskirts of San Francisco. This is one of the most recent tall buildings in the city. The Wells Fargo Bank is also situated on this plaza. It is of special interest, both as regards its shape and functional organisation. It has a ground floor, where most of the mercantile activities take place, and a basement, containing a Council room; the strong rooms, with 2,500 private boxes as well as the bank's own safe; washing rooms; mechanical equipment rooms; a rest room; a bar for the employees and independent stairs. The building has a circular planform, 21.5 m in diameter and 354 m2 in area. The structure is metallic, the vertical supports are along the periphery, spaced every 1.626 m. The enclosing curtain walls are glass and anodized aluminium. The roof has radially distributed metal beams, interconnected by prefabricated concrete units, covered with copper sheeting. This bank, shaped like a hunting lodge, and finished with delicate care, contrasts sharply with the powerful volume of the Crown Zellerbach, and of other nearby buildings, and adds distinction to the plaza.Sobre una gran plaza triangular del extrarradio de San Francisco se alzan: el Crown Zellerbach, uno de sus más recientes rascacielos, y un bello pabellón independiente, el Wells Fargo Bank. El resto de la plaza es de dominio público. La originalidad, en forma y organización del segundo, ha hecho que le dediquemos la mayor atención: consta de una planta baja, en la que se desarrollan, prácticamente, todas las actividades mercantiles, y un piso inferior, en donde se distribuyen: un Salón de Consejos, el departamento de cajas de seguridad, con 2.500 unidades, y las cajas del Banco, los aseos, equipos mecánicos, etc., una sala de descanso y bar para los empleados, con escalera de acceso independiente. Tiene planta circular, de 21,5 m de diámetro y 354 m2 de superficie. La estructura es metálica, con

  10. Análisis de la respuesta de edificios unifamiliares adosados de obra de fábrica sometidos a asentamientos inducidos por tunelación

    OpenAIRE

    Gálvez Buezo, Javier

    2012-01-01

    En el presente trabajo se estudia el comportamiento de la obra de fábrica como elemento estructural portante. La obra de fábrica es un material que por su constitución presenta una capacidad nula o prácticamente nula de resistir tracciones. Por ello, los edificios proyectados con este material se diseñan con formas geométricas priorizando las compresiones, como pueden ser las paredes de carga, los pilares, arcos y bóvedas. El problema resulta cuando, por razones imprevistas, la estructura ...

  11. Edificio Telve, en Cortina d'Ampezzo

    Directory of Open Access Journals (Sweden)

    Gellner, Edoardo

    1964-04-01

    Full Text Available This building belongs to the telephone company, and its general distribution is as follows. The semibasement is occupied with a garage, stores, and a room where the generator and batteries are situated. The ground floor opens to a square by means of an arcade: which leads to the public telephones and the company's offices. The second floor is taken up with the amplifiers and the power station. On the second floor the automatic exchange has been located. The third storey provides space for the intercity exchange and changing rooms for the telephone operators. Finally, in the attic there is a living room for the staff, as well as bedrooms for the auxiliary personnel. The structure of the building is in reinforced concrete, and it shows externally. The spaces between the structural elements are covered in timber, in the shape of planks in their natural texture, interspersed with pine strips, painted in blue. On the ground floor there is a fringe of red Castellavazzo stone, and the pavement underneath the arcade is covered with roughly shaped porflde stone slabs.Ocupado por la Compañía Telefónica, presenta la siguiente distribución: El semisótano comprende: entrada de servicio, garaje, almacenes y cuartos de baterías y generadores. La planta baja da a la plaza, posee una zona con soportales, y en ella están situados los locutorios públicos y las oficinas de la Compañía. En el primer piso están ubicadas la sala de amplificadores y estación de energía; y en el segundo, la central automática. El tercer piso aloja la central interurbana y vestuario para las telefonistas.

  12. Edificio Goya - Almería – España

    Directory of Open Access Journals (Sweden)

    Vallejo Acevedo, A.

    1973-03-01

    Full Text Available The building stands In the main avenue in Almería and successfully solves the different problems which its location involves: treating the frontage with a blend of suitable texture and colour; very careful formal plastic and pondered height and offset. It is made up of: — a commercial ground floor, — first floor - offices, — eight identical floors, with one dwelling per floor, — attic, taken up by another slightly smaller dwelling, and — an upper attic which houses the caretaker's dwelling and miscellaneous installations. The strong vertical structure is made up of perimetre line components and a compact core of vertical circulations, in reinforced concrete.El edificio está situado en la avenida principal de Almería y resuelve acertadamente los diversos problemas que entraña su emplazamiento: tratamiento de fachada con un vitraico de textura y color adecuados; plástica formal muy cuidada, y altura y retranquees ponderados. Consta de: — una planta baja comercial; — primera de oficinas; — ocho plantas iguales, con una vivienda por planta; — ático ocupado por otra vivienda algo más reducida, y — sobreático que alberga la vivienda del portero e instalaciones varias. La estructura vertical resistente está formada por elementos lineales perimetrales y núcleo compacto de circulaciones verticales, de hormigón armado.

  13. Edificio de asistencia social de la CIBA. Basilea

    Directory of Open Access Journals (Sweden)

    Suter y Suter, Arquitectos

    1961-03-01

    Full Text Available Cada vez se hace más frecuente la construcción de edificios destinados a una función social —comedores, salas de conferencias y proyecciones, salones de exposiciones— dentro del programa orgánico de las grandes industrias. Esto, sin duda, contribuye poderosamente a la confraternización del personal que, así, trabaja, come y se distrae en unión de sus jefes y de sus compañeros.

  14. Enlace inalámbrico de dos edificios

    OpenAIRE

    MENDOZA JAENS, DAVID ALBERTO

    2015-01-01

    Debido a cambios propuestos por el Gobierno actual, el Gerente General del Banco Central del Ecuador, reubicó personal que laboraba en las oficinas ubicadas en el edificio principal ubicado en 9 de Octubre 200 y Pichincha, donde el departamento de Recuperación y Liquidación de la Banca Cerrada Guayaquil cumplía sus funciones. Ante este requerimiento, se le solicitó al personal de Ingeniería de Sistemas y Comunicaciones dar la solución técnica que mantenga el nivel de servicio de los funcionar...

  15. Evaluation of environmental sustainability in the construction and management of buildings in Mexico; Evaluacion de la sustentabilidad ambiental en la construccion y administracion de edificios en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    De Buen Rodriguez, Odon [Energia, Tecnologia y Educacion, S.C., ENTE, S.C. (Mexico)

    2010-12-15

    international system of certification of environmental sustainability. In particular, it is recommended: 1) To suggest to CONUEE the integration of additional variables to its database, 2) To conduct a national survey of commercial buildings, 3) To review information on commercial buildings located in Mexico by international organizations. Likewise, besides the support of the CONUEE, it would be useful to carry out an study jointly with the Comision Federal de Electricidad (CFE), the Secretaria de Energia (SENER) and the Fideicomiso para el Ahorro de Energia Electrica (FIDE), in order to share and generate information for common analytical needs. Also, it is suggested to establish contact with chambers, associations and companies operating primarily in buildings such as schools, hospitals, hotels, department stores, supermarkets and restaurants. [Spanish] Esta investigacion tuvo como objetivo desarrollar una metodologia para la evaluacion de la sustentabilidad de los edificios en Mexico que pueda ser estandarizada y equiparable con el resto de Norteamerica. Con este proposito se revisaron y analizaron tres sistemas de evaluacion de edificaciones sustentables en Norteamerica: Leadership in Energy and Environmental Design (LEED), Living Building Challenge (LBC) y Energy Star for Buildings. Ademas, se incluyo en el analisis el sistema espanol Green Building Council Espana (GBCe) con el fin de tener un punto referencia distinto al norteamericano. Como resultado del analisis de los sistemas de evaluacion consultados se decidio utilizar Energy Star como sistema de referencia para el desarrollo de una metodologia propia por las siguientes razones: a) La metodologia de Energy Star permite la comparacion de consumos de energia, lo cual permitiria estimar emisiones de gas de efecto invernadero, b) Es el sistema que requiere de la descripcion mas sencilla del edificio (datos de area, de ocupacion y de demanda y consumo energeticos) y no requiere - a diferencia de los otros sistemas

  16. Evaluation of environmental sustainability in the construction and management of buildings in Mexico; Evaluacion de la sustentabilidad ambiental en la construccion y administracion de edificios en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    De Buen Rodriguez, Odon [Energia, Tecnologia y Educacion, S.C., ENTE, S.C. (Mexico)

    2010-12-15

    fully international system of certification of environmental sustainability. In particular, it is recommended: 1) To suggest to CONUEE the integration of additional variables to its database, 2) To conduct a national survey of commercial buildings, 3) To review information on commercial buildings located in Mexico by international organizations. Likewise, besides the support of the CONUEE, it would be useful to carry out an study jointly with the Comision Federal de Electricidad (CFE), the Secretaria de Energia (SENER) and the Fideicomiso para el Ahorro de Energia Electrica (FIDE), in order to share and generate information for common analytical needs. Also, it is suggested to establish contact with chambers, associations and companies operating primarily in buildings such as schools, hospitals, hotels, department stores, supermarkets and restaurants. [Spanish] Esta investigacion tuvo como objetivo desarrollar una metodologia para la evaluacion de la sustentabilidad de los edificios en Mexico que pueda ser estandarizada y equiparable con el resto de Norteamerica. Con este proposito se revisaron y analizaron tres sistemas de evaluacion de edificaciones sustentables en Norteamerica: Leadership in Energy and Environmental Design (LEED), Living Building Challenge (LBC) y Energy Star for Buildings. Ademas, se incluyo en el analisis el sistema espanol Green Building Council Espana (GBCe) con el fin de tener un punto referencia distinto al norteamericano. Como resultado del analisis de los sistemas de evaluacion consultados se decidio utilizar Energy Star como sistema de referencia para el desarrollo de una metodologia propia por las siguientes razones: a) La metodologia de Energy Star permite la comparacion de consumos de energia, lo cual permitiria estimar emisiones de gas de efecto invernadero, b) Es el sistema que requiere de la descripcion mas sencilla del edificio (datos de area, de ocupacion y de demanda y consumo energeticos) y no requiere - a diferencia de los otros

  17. Energy saving in office buildings through cheap bioclimatic design measures; Ahorro de energia en edificios de oficinas a partir de medidas de diseno bioclimatico de bajo costo

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Chavez, Jose Roberto [Universidad Autonoma Metropolitana, Unidad Azcapotzalco (Mexico)

    2007-01-15

    This article shows the study performed in a building of Campus Uni dad Azcapotzalco in order to evaluate some bioclimatic design strategies. And to reach the higrothermic comfort and the appropriate lighting to favor employees to increase their performance in work activities. There are some strategies in order to solve this problem: the skylight area reduction, existing lights change, ventilation increase, fixed partition door implementation, etc. The obtained outcomes make possible the beginning of bioclimatic design use to save energy in other buildings, because sometimes edifications possess a design that cause the energy waste. [Spanish] En este articulo se muestra el estudio que se hizo en un edificio en el Campus Unidad Azcapotzalco, el fin de esta labor es evaluar ciertas estrategias de diseno bioclimatico para que las personas que operan en este edificio puedan tener confort higrotermico y una iluminacion pertinente, que den como resultado un mejor desempeno en las tareas que realizan. Algunas de las estrategias para darle solucion a esta problematica son: disminuir del area de lucernarios, cambiar las luminarias existentes, aumentar la ventilacion, implementar canceleria, etc. Con los resultados obtenidos nace la esperanza de que se utilicen estrategias de diseno bioclimatico para ahorrar energia en otros edificios, ya que muchas veces las edificaciones poseen un diseno que unicamente provoca el uso imprudente de la energia.

  18. Consolidación estructural del edificio patrimonial de C/Ripoll, 25 de Barcelona - Ca la Dona

    Directory of Open Access Journals (Sweden)

    Bestraten, S.

    2012-12-01

    Full Text Available The building, found in 25th Ripoll Street, in Barcelona, is listed by the Special Plan for protection of architectural heritage of the Barcelona district, Ciutat Vella. In 2005, the Ca la Dona association with support from all Catalan public administrations, starts a restoration process under a sustainability criteria. An innovative structural intervention is performed consisting in a functional replacement of the existing floorings with cross-laminated timber panel, which, doesn’t change the overall load state of the building, making compatible the structural continuity of the existing load-bearing walls. This project opens a way to the prefabrication of solutions used in architectural restoration, allowing to adapt to regulatory constraints, along with considering current issues, such as, sustainability.

    El edificio de la calle Ripoll nº25 de Barcelona está catalogado por el Plan especial de protección del patrimonio arquitectónico del distrito barcelonés de Ciutat Vella. En 2005 la asociación Ca la Dona con el apoyo de todas las administraciones públicas catalanas inicia un proceso de rehabilitación con criterios de sostenibilidad. Se realiza una intervención estructural innovadora consistente en una sustitución funcional de forjados existentes con panel de madera contralaminada, que en general no modifica el estado de cargas del edificio haciendo compatible la continuidad estructural de los muros de carga existentes. Este proyecto abre un camino a la prefabricación en la rehabilitación arquitectónica, que permite su adaptación a los requerimientos normativos actuales y a su vez integra consideraciones tan actuales como la sostenibilidad.

  19. Edificio para Cristalería Española

    Directory of Open Access Journals (Sweden)

    de la Joya, R.

    1964-03-01

    full and careful study of cost when preparing a project involving curtain walls, in order to evaluate correctly their advantages.Dio a conocer—dentro del ciclo de conferencias sobre muros-cortina, celebrado en la Escuela Técnica Superior de Arquitectura, de Madrid—sus experiencias personales en la construcción de un edificio, proyectado por él y por Manuel Barbero, para Cristalería Española, en San Andrés del Palomar, de Barcelona. Enumeró las ventajas que exponen los técnicos de otros países sobre el muro-cortina: menor peso de los materiales que componen la fachada; máximo aprovechamiento de la superficie habitable; abaratamiento de la cimentación; mejor control del tiempo; calidad y precisión; y facilidad de conservación. A continuación, y en el mismo orden, explicó por qué y en qué puntos no estaba de acuerdo con dichas ventajas: 1.° Partiendo de la construcción actual, con elementos de hormigón y forjados de tipo aligerado, no es fácil obtener una gran economía debido a la serie de elementos que hay que emplear para colocar y mantener en su sitio el muro-cortina. 2.° Que aunque teóricamente el muro-cortina puede tener 4 ó 5 m de espesor, la realidad es que si no es a costa de un enorme aumento de la calefacción, o del acondicionamiento, precisan, además, un revestimiento interior. 3.° Es muy difícil que los cimientos puedan abaratarse por el empleo de este tipo de fachada, ya que dicho abaratamiento es más teórico que real. 4.° Que aparte de que el factor tiempo suele fallar, la calidad en la ejecución no está todavía muy lograda. 5.° Se necesita un entretenimiento periódico para que la vejez no se acentúe, al igual que en las fachadas de tipo tradicional. Se extendió en una serie de consideraciones, además de las puramente técnicas, que no aconsejan el empleo del muro-cortina en España (economía en la mano de obra de albañilería, factor clima, carestía de las instalaciones de acondicionamiento, etc.. A continuaci

  20. Desarrollo de una herramienta para validar la influencia del comportamiento del usuario sobre la eficiencia energética en edificios públicos de oficinas.

    Directory of Open Access Journals (Sweden)

    Alción de las Pléyades Alonso Frank

    2016-12-01

    Full Text Available La problemática ambiental global conduce a que numerosos países incorporen estrategias de Eficiencia Energética (EE a fin de disminuir el consumo de energía, aspecto que valoran mediante etiquetados o pasaportes de EE. Como hipótesis se considera que los usuarios de edificios son responsables del consumo de energía no previsto en la etapa de funcionamiento, por lo que el objetivo del presente trabajo es desarrollar y validar una herramienta de valoración del comportamiento de usuarios de espacios de trabajo en edificios públicos de oficinas. Para ello, se lleva a cabo un trabajo de campo en tres edificios ubicados en la ciudad de San Juan, Argentina. Se realizan encuestas a fin de evaluar los hábitos que el usuario emplea como estrategias para satisfacer su condición de confort térmico, en correlación con los consumos de energía registrados. Se elabora un indicador del Nivel de Eficiencia del Usuario (NEU y se transfiere a una etiqueta, a efectos de obtener una rápida aprehensión por parte del mismo. Los resultados reflejan variaciones en la frecuencia de uso de artefactos de climatización, apertura de puertas y ventanas, control de parasoles y cortinas y modificación de la ropa por los usuarios, llegando a observarse variaciones del consumo energético del edificio. Los valores obtenidos del NEU, permiten demostrar la eficiencia del comportamiento de usuarios en relación al cuidado de la energía.

  1. Edificio para la Libbey-Owens-Ford Glass Company

    Directory of Open Access Journals (Sweden)

    Skidmore, Owings & Merrill, Arquitectos

    1965-04-01

    Full Text Available This is a 15 storey building, located in Toledo, Ohio, and will house the general offices of the Libbey-Owens-Ford Company. There is a basement, which contains air conditioning equipment, stores, service rooms, and similar facilities. The ground floor occupies a smaller area than the floors above, and the difference in area provides a covered arcade round the building. The main hall and lift shafts take up most of the ground floor space. All the remaining storeys are devoted to offices. This is a good example of contemporary functional architecture and also an exciting manifestation of the use of glass in this type of buildings.Este edificio, de 15 plantas de altura, construido en Toledo, Ohio, para oficinas generales de la Libbey-Owens- Ford Glass Company, consta de: un sótano destinado a albergar los equipos mecánicos para el acondicionamiento de aire, etc., almacén, departamentos de servicio, etc. El cuerpo de edificación de la planta baja, que aparece retranqueado de los soportes perimetrales creando una zona porticada, aloja el vestíbulo principal, núcleo de comunicaciones verticales, etcétera. Las restantes plantas están ocupadas por oficinas. No solamente este edificio es un destacado ejemplo de arquitectura moderna, sino que también es una suscitante manifestación de las ideas arquitectónicas en cristal.

  2. Técnicas de Control del Confort en Edificios

    Directory of Open Access Journals (Sweden)

    M. Castilla

    2010-07-01

    Full Text Available Resumen: La mayor parte del tiempo, las personas realizan sus actividades cotidianas en el interior de edificios, siendo por tanto preciso controlar las condiciones de confort (térmico, visual y calidad de aire en el interior de los mismos, intentando minimizar el consumo energético simultáneamente. Este trabajo presenta una revisión de técnicas de control del confort en edificios. También muestra los resultados obtenidos en la implementación de un sistema de control jerárquico, que permite obtener situaciones de confort térmico adecuadas en el interior del CDdI-CIESOL-ARFRISOL (Contenedor Demostrador de Investigación - Centro de Investigación de la Energía Solar - Proyecto Singular Estratégico ARFRISOL de la Universidad de Almería. Palabras Clave: Control jerárquico, Confort térmico, Confort visual, Calidad de aire

  3. Análisis y propuesta de mejoras para la eficiencia energética del edificio principal del Instituto c.c. Eduardo Torroja-CSIC

    Directory of Open Access Journals (Sweden)

    Martín-Consuegra, F.

    2014-12-01

    Full Text Available As part of the 80th anniversary of IETcc-CSIC, a proposal for the rehabilitation of the 1953 building is made. The analysis of the main building’s energy performance concludes that it is not energy efficient. Energy efficiency improvement measures based on European directives are proposed, It is recommended to incorporate them step by step, starting with passive measures to reduce energy needs. Afterwards active measures, such as improving the performance of facilities, are proposed, so that the least possible amount of final energy is used to meet the comfort standards. To complete the operation, the use of renewable energy sources is proposed to reduce the consumption of non-renewable primary energy. Energy and building rehabilitation improvement measures in the IETcc-CSIC should be demonstrators for other public buildings with heritage values.En el marco del 80 aniversario del IETcc-CSIC se elabora una propuesta para la rehabilitación del edificio construido en 1953. Partiendo del análisis del comportamiento energético del edificio principal, se concluye que este no es eficiente energéticamente. Se proponen mejoras para la eficiencia energética del edificio tomando en cuenta las directivas europeas. Se recomienda incorporar las mejoras de forma escalonada, comenzando por las medidas pasivas para reducir sus necesidades energéticas. A continuación se proponen medidas activas, como la mejora del rendimiento de las instalaciones, de manera que se emplee la menor cantidad posible de energía final para satisfacer el confort de los usuarios. Para completar la intervención se propone el uso de fuentes de generación de energías renovables en la parcela con el objetivo de reducir el consumo de energía primaria no renovable. Las acciones para la rehabilitación energética e integral del edificio del IETcc-CSIC, deben ser demostradoras para otros edificios públicos con valores patrimoniales.

  4. Electrodo biológico con la enzima hidrogenasa, procedimiento de obtención y sus aplicaciones

    OpenAIRE

    Fernández López, Víctor Manuel; López de Lacey, Antonio; Rüdiger Ortiz, Olaf

    2005-01-01

    Electrodo biológico con la enzima hidrogenasa, procedimiento de obtención y sus aplicaciones. En la presente invención se protegen electrodos biológicos modificados con enzimas hidrogenasas (ánodos) mediante los cuales es posible obtener energía eléctrica del hidrógeno en una configuración típica de pilas de combustible; asimismo, con estos electrodos modificados con hidrogenasa (cátodos) es posible producir hidrógeno a partir de agua en una configuración típica de cél...

  5. Nuevo edificio de la Lincoln Savings, en Los Angeles, California, (U.S.A.

    Directory of Open Access Journals (Sweden)

    Deasy & Boiling, Arquitectos

    1968-03-01

    Full Text Available The building has eight floor levels devoted to the main functions of the bank, a ninth storey houses various services, and a car park is located in the basement. The ground floor is highly diaphanous and is occupied by those departments that are more intimately related with the outside public. The second floor is devoted to banking and credit operations. There is a museum on the seventh floor, and a dining hall on the eighth, as well as a cafeteria and a social zone for the staff. The remaining floor space has been let for offices to a number of commercial firms. The structure and external aspect are outstanding because of their originality.El edificio consta de ocho plantas en servicio; una novena, que alberga los equipos mecánicos; y un sótano, destinado a aparcamiento. La planta baja, que goza de una gran diafanidad, aloja los servicios que exigen un contacto más frecuente con el público; en la segunda, las secciones en las que se desarrollan las operaciones de crédito y bancarias; en la planta séptima, el museo; y en la octava, el comedor, la cafetería y zona social para empleados. Las restantes plantas han sido alquiladas para oficinas de diversas firmas y empresas comerciales. Son de destacar, la estructura y el tratamiento de fachadas, de indudable gracia y originalidad.

  6. Y Castilla se hizo España... Nacionalización y representación cinematográfica de Castilla en el NO-DO, 1943-1956

    Directory of Open Access Journals (Sweden)

    Gloria GARCÍA GONZÁLEZ

    2016-05-01

    Full Text Available La poderosa presencia del NO-DO en las pantallas de cine de todo el país durante cuatro décadas hizo de él un imprescindible instrumento de propaganda y un valioso agente de nacionalización al servicio del régimen franquista. Pueblos y regiones españolas sufrieron en sus programas un constante proceso de mistificación encaminado a dibujar una imagen de país acorde con los parámetros políticos de la dictadura.A ese efecto, Castilla se ofrecía a las autoridades de la dictadura como el pretexto perfecto para impulsar, también desde el lenguaje cinematográfico, una potente renacionalización del país en torno la lengua, a sus valores tradicionales y a una idea de España basada en la Castilla unitaria, católica e imperial.

  7. Neuronal networks for the study of buildings thermal behavior; Redes neuronales para el estudio del comportamiento termico de edificios

    Energy Technology Data Exchange (ETDEWEB)

    Marincic, Irene [Universidad de Sonora (Mexico); Del Rio, J. Antonio [Centro Morelense de Innovacion y Transferencia Tecnologica (Mexico)

    2009-07-15

    este trabajo se presenta un estudio preliminar que analiza la precision de un modelo de red neuronal para la prediccion de temperaturas interiores en un edificio, dadas las temperaturas exteriores. Se plantea una red muy simple, de 3 neuronas, ubicadas en 2 capas. Se analizan los resultados de las temperaturas interiores obtenidas tanto en la etapa de aprendizaje como en la de prediccion, comparandolos con los obtenidos utilizando otro modelo de caja negra desarrollado por los autores con anterioridad, el de la funcion respuesta en el dominio de las frecuencias.

  8. Edificio de oficinas para el Sacramento Municipal Utility District – Smud

    Directory of Open Access Journals (Sweden)

    Dreyfuss & Blackford, Arquitectos

    1963-03-01

    Full Text Available This building takes advantage of the uneveness of the ground, and seeks to enhance the attractiveness of the landscape. It includes a cafeteria, an auditorium for 190 persons, exhibition hall, space for the various departments, and other facilities. Allowance has been made for a 30% increase in the staff. One floor level has been constructed, but is not fully completed, and there is the possibility of adding another one. There is parking space for 720 automobiles. The glass walls are specially fitted with a protection, whereby the sun does not shine on the office tables. The external colour of the building changes continuously, for the aluminium reflects or absorbs the sun, depending on the time of day and the season of the year: this colour changes from bronze to quartz tone, under the effect of the sun, and from white to grey in the shade. The green turf emphasizes the delicate tones of the building. The basic requirements have been satisfied by means of a beautiful and harmonious design, which constitutes an altogether important architectural unit.Ha sido construido aprovechando los desniveles del ter reno para crear un paisaje interesante. Dispone de: cafetería, auditorio para 190 personas, sala de exposición, espacios para los distintos departamentos, etc. Se ha previsto pueda servir para un aumento de un 30% de empleados, existiendo una planta construida, pero no acabada, y la posibilidad de construir otra. Estacionamiento con capacidad para 720 coches. Toda la zona acristalada está protegida mediante dispositivos que impiden a los rayos solares incidir sobre las mesas de trabajo. El color exterior del edificio cambia continuamente, ya que el aluminio refleja o absorbe el sol, según las horas del día o la época del año, pasando de un tono bronceado a un blanco cuarcífero. En la sombra, del blanco al gris. Las fajas verdes de césped destacan la brillante delicadeza de las paredes. En forma bella y armoniosa han sido satisfechas las

  9. Edificio de apartamentos Jardín del Atlántico Gran Canaria – España

    Directory of Open Access Journals (Sweden)

    López Díaz, Luis

    1978-11-01

    Full Text Available This building is located in the Playa del Inglés, the central core of the Maspalomas tourist resort, and was built as an answer to the urgent need for accommodations imposed by the overwhelming tourist influx arriving in increasingly larger and numerous charter flights. The building (containing 334 units in its five stories, all of the same type and identically oriented is provided with all amenities and facilities normally found in the best of hotels, such as two bars, a restaurant, a shopping area with several stores, social rooms, dance hall, gymnasium, sauna bath, tennis courts, four large swimming pools, children's playground, beauty parlour and barber shop, large carpark, 15,000 m2 of landscaped area, etc., offering occupants a healthy, enjoyable and convenient environment.

    En la Playa del Inglés, núcleo central del complejo turístico de Maspalomas, se ha levantado este edificio de apartamentos como respuesta a la imperiosa necesidad hotelera, motivada por la masiva afluencia de turistas que se desplazan en los, cada vez más grandes y numerosos, vuelos charter. El edificio, que en sus cinco plantas de altura distribuye 334 apartamentos —todos ellos del mismo tipo y con idéntica orientación—, está dotado de todas las comodidades y atracciones que pudiera tener el más completo de los hoteles, tales como: dos bares, restaurante, zona comercial con diversas tiendas, salones sociales, sala de baile, gimnasio, sauna, cancha de tenis, cuatro grandes piscinas, parque infantil, peluquerías de señoras y caballeros, amplísimo aparcamiento para coches, 15.000 m2 de jardín, etc., que proporcionan a sus ocupantes una vida sana, amena y confortable.

  10. Edificio Beatriz - Madrid – España

    Directory of Open Access Journals (Sweden)

    Población, E.

    1973-04-01

    Full Text Available This article describes the purpose, program and architectural plan, as well as the final design, system of construction, calculations and tests connected with this important office building, which has a finely evolved and modern style, and an interesting structure, affecting its five basements and ten floors above ground level.Se describen en el artículo los objetivos, programa, antecedentes arquitectónicos, solución adoptada, construcción, cálculo y ensayos que han sido precisos para realizar este importante edificio de oficinas, que une a su línea depurada de moderna factura una estructura muy interesante desde varios puntos de vista, desarrollada a lo ancho y a lo alto de sus cinco sótanos y sus diez plantas altas.

  11. Sistema distribuido para monitorización y control integrado de edificios

    Directory of Open Access Journals (Sweden)

    Gomes, L.

    1999-02-01

    Full Text Available SUMMARY The works to be presented in this paper are related with information technology application on the intelligent building concept. A distributed system targeted for integrated building monitoring and control will be presented. The system is also able to support business activities and services. The concept of domot introduced (domot = “domus" + "robot" as the third active occupant of the building, coexisting with users and managers, and able to manage resources and be at other occupant disposal. The system relies on the definition of two types of template architectures, to be used as references by the software and hardware parts of the system. The software reference template is based on a heterogeneous distributed network of workstations, running a set of process with interprocess communication based on the client-server paradigm. The hardware reference template is based on a architecture based on two levels of networks; the first one is used for the communication between high-level control workstations (targeted for supervision and monitoring and the second one is targeted to support low-level controllers communcation. These two types of templates constitute the basis for a robust and open system based implementation of an infrastructure that is able to support both business activities and the single occupant wishes, enabling synergistic developments. The user interface, which may run anywhere in the world as far as a TCP-IP connection is available, is hierarchically organised; specific information and dialogues are provided for the monitoring and management of different types of devices and systems installed in the building. The systems already integrated are intrusion, CCTV and PABX. Access control and HVAC will follow in the near future.

    Los trabajos que se presentan en este artículo se relacionan con la aplicación de la tecnología de información en el concepto de edificio inteligente. Será propuesto un sistema

  12. The super conservation energy building of the Ohbayashi corporation in Tokyo, Japan; El edificio super conservador de energia de la corporacion Ohbayashi en Tokio Japon

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Vargas, Ricardo [Instituto Tecnologico de La Laguna, La Laguna (Mexico)

    1994-12-31

    The main building of the Institute of Technical Investigation of Ohbayashi Corporation in Tokyo, Japan, was built with the objective of being the best all over the world in the grounds of energy conservation. The utilization of this building was initiated on April 15, 1982 registering an annual energy consumption in the first two years of 87 and 96 Million calories/m{sup 2} respectively, that is, less than one fourth the consumption in conventional buildings. The inside ambient is better or equal to the one of ordinary buildings and the time for the investment recuperation was estimated of 8.7 years. The classification for the energy consumption in those first two years was of 31% for air conditioning, 41% for lighting/wall receptacles and 25% for others. The maximum consumption was in the month of August and was of 10 to 11 Mcal/m{sup 2}. The minimum consumption corresponded to the month of November and was 6 to 7 Mcal/m{sup 2}. In 1984 this building won the prize Energy of the ASHRAE. A total od 98 conservation measures were adopted for its construction and operation. [Espanol] El principal edificio del Instituto de Investigacion Tecnica de la corporacion Ohbayashi en Tokio, Japon, fue construido con el objetivo de ser el mejor en el mundo en el terreno de la conservacion de energia. La utilizacion de este edificio comenzo el 15 de abril de 1982, registrando un consumo anual de energia en los dos primeros anos de 87 y 96 Mcal/m{sup 2} respectivamente, esto es, menos de un cuarto del consumo en edificios convencionales. El ambiente interno es mejor o igual que el de edificios ordinarios y el tiempo de recuperacion de la inversion se estimo en 8.7 anos. La clasificacion en el consumo de energia para esos dos primeros anos fue de 31% para el acondicionamiento de aire, 41% para la iluminacion/contactos y 25% para otros. El maximo consumo aparecio en el mes de agosto y fue de 10 a 11 Mcal/m{sup 2}. El minimo consumo correspondio al mes de noviembre fue de 6 a 7 Mcal

  13. La Inspección Técnica de Edificios como herramienta de la mejora energética de la edificación existente

    Directory of Open Access Journals (Sweden)

    Serrano Lanzarote, B.

    2015-03-01

    Full Text Available The regulatory framework of the Spanish Technical Building Inspection (Inspección Técnica de Edificios, ITE has recently been modified in order to adapt it to the new needs in the buildings refurbishment field, broadening its focus from solely on the conservation state to include issues such as energy certification and accessibility. Currently, this procedure has a new name: Buildings Evaluation Report (Informe de Evaluación de los Edificios, IEE. In this article the potential of this instrument in promoting energy savings in household is discussed. However, the ITE legislation is not enough, since there are a large number of municipalities in which this procedure has not yet been established. Strategies are proposed to overcome this barrier and to ensure that these technical reports are implemented at large scale; otherwise the expected energy savings induced by the ITE in the residential park will hardly be achieved.El marco normativo de la Inspección Técnica de Edificios (ITE, en adelante en España ha sido modificado recientemente con objeto de adecuarlo a las nuevas necesidades en materia de rehabilitación de edificios, ampliando su enfoque sobre el estado de conservación, hacia aspectos como la certificación energética y la accesibilidad, pasando a designarse Informe de Evaluación de los Edificios (IEE, en adelante. En este artículo se expone el potencial de dicho instrumento para fomentar el ahorro energético en las viviendas. No obstante, el simple hecho de legislar la ITE no ha sido suficiente, pues existe un gran número de municipios en los que no está implantada. Se presentan unas estrategias para ayudar a salvar esta barrera y garantizar que estos informes comiencen a elaborarse a gran escala, pues, de lo contrario, difícilmente se alcanzará el hipotético ahorro energético, inducido por la ITE, en el parque residencial.

  14. Edificio de la American Zinc Co. - St. Louis - Missouri – (EE. UU.

    Directory of Open Access Journals (Sweden)

    Hellmuth, George

    1978-12-01

    Full Text Available This design serves two very clearly distinct purposes: on the one hand, the three office floors, 2,800 m2 each, assure a high degree of interior lay-out flexibility, and on the other, the exterior appearance displays the nature of the Company, active in the metal field. For the first purpose, two piers 15 m appart on the main façade leave free from obstacles the entire floor space of the several storeys, while for the other purpose, the stinless-steel-covered outside surfaces form an Identification sign for the Company occupying the buildings. The inpressively broad bays between piers that turn the ground floor into a virtually diaphanous and unobstructed area, give the feeling of a very light building, almost suspended in mid-air.

    El proyecto satisface dos objetivos claramente definidos: por un lado asegura, para las plantas de oficina —tres en total, con 2.800 m2 de superficie—, un alto grado de flexibilidad en la distribución interior, y por otro refleja, exteriormente, la naturaleza de la empresa, dedicada al ramo de la metalurgia. Para el primer propósito se dispusieron sobre la fachada principal dos pilares distanciados unos 15 m entre sí, que dejan libres de obstáculos toda la superficie de las plantas. Para el otro fin se utilizó un revestimiento de fachadas con módulos de acero inoxidable, como signo de identidad para la compañía. Destaca en la obra la imponente luz entre pilares que, al dejar prácticamente diáfana la planta baja, dan al edificio la impresión de un volumen ligero, casi suspendido en el aire.

  15. Las redes verticales de seguridad en la construcción de edificios. I

    Directory of Open Access Journals (Sweden)

    Maciá Mateu, Antonio

    2002-02-01

    Full Text Available In the different countries, various safety net systems were developed in the last half century to avoid accidental falls during structure building. The vertical safety net system genuine from Spain, as well as the other systems, have suffered some serious and fatal accidents, that led to improvements in their design. In the first part of his paper, the behaviour of the spanish vertical safety net system is analyzed in the light of some previous experiments and a simplified mathematical model, that allow to assess some design defects and to set up their qualitative correction. In a second part, the results of other dynamic experiments with weight fall over instrumented prototypes and the conclusions of another more complex and adjusted numerical model will be focused.Para la prevención de caídas al vacío con riesgo de heridas graves o muerte durante la construcción de edificios, en los distintos países se desarrollaron durante la mitad del S XX diversos sistemas de redes de seguridad. En el sistema de redes verticales, genuino y prácticamente exclusivo de España, se han registrado, al igual que en el resto de sistemas, varios accidentes graves y mortales que han conducido a mejoras en ellos. En la primera parte de este artículo se analiza el funcionamiento del sistema español de redes verticales a la luz de algunos ensayos previos y de un modelo matemático simplificado, que permiten apreciar algunos defectos de diseño y establecer su corrección cualitativa. En una segunda parte se expondrán los resultados de otra serie de ensayos dinámicos con lanzamiento de lastre sobre prototipos instrumentados y las conclusiones de un modelo numérico más complejo y ajustado a la realidad.

  16. Variaciones de la arteria del nodo sinoatrial en población colombiana

    Directory of Open Access Journals (Sweden)

    Yobany Quijano Blanco

    2012-01-01

    Full Text Available Antecedentes. El conocimiento exacto de la integración anatomofisiológica del sistema de conducción del corazón, es fundamental para la comprender la fisiopatología, el diagnóstico y el manejo de muchas de las complicaciones de la enfermedad coronaria y de las cardiopatías en general. Uno de los aspectos fundamentales, más variable y con mayores repercusiones clínicas corresponde al origen y recorrido de las arterias encargadas de irrigar el nódulo sinoatrial. Objetivo. Determinar el origen, recorrido y distribución de las arterias que irrigan el nódulo sinoatrial en una muestra de población colombiana.  Material y métodos. La muestra de análisis fueron 60 bloques cardiopulmonares y digestivos seleccionados a través de muestreo por conveniencia. A estos se les realizó una disección convencional de los genitales para la determinación del sexo y posteriormente se procedió con la disección de las arterias coronarias específicamente de la arteria del nódulo sinoatrial, con el fin de establecer su origen y recorrido. Resultados. Como hallazgo principal se encontró que el origen de la arteria del nódulo sinoatrial en 75% provenía  de la coronaria derecha, un 15% procedía de la arteria circunfleja y el 10% restante fue codominante. En cuanto al trayecto 86,6% fueron lineales, mientras 13,4% tuvieron formas alternas como Y, doble Y o en tridente. Conclusiones. Se evidenció predominio del  origen de la arteria del nódulo sinoatrial en la coronaria derecha, hallazgo coincidente con investigaciones similares e independiente de la procedencia geográfica y el origen racial. Sin embargo, en este estudio se evidenciaron  recorridos no reportados en la literatura como la distribución en Y, en doble Y, en K invertida y en tridente.

  17. ARCHAEOMAGNETIC STUDY OF THE EDIFICIO DE LAS COLUMNAS COMPLEX, EL TAJIN, MESOAMERICA (Estudio arqueomagnético del complejo del Edificio de las Columnas, El Tajín, Mesoamérica

    Directory of Open Access Journals (Sweden)

    Jaime Urrutia-Fucugauchi

    2017-12-01

    Full Text Available We report the initial results of an archaeomagnetic study on ceramic samples from the Edificio de las Columnas architectonic complex, located in the northern sector of El Tajin, an archaeological site. Measurements of magnetic properties include low-field susceptibility, direction and intensity of natural remanent magnetization, magnetic hysteresis, temperature-dependent susceptibility, isothermal remanent magnetization (IRM acquisition curves and back-field demagnetization of saturation IRM. We studied the vectorial composition and stability of remanent magnetization using alternating field and thermal demagnetization. Magnetic carriers are fine-grained titanomagnetites and magnetite with pseudo-single domain states. Characteristic magnetizations are determined from the high-temperature unblocking spectra. Determinants of paleointensity, which meet quality criteria, have high and low values. Possible explanations include alterations during thermal treatments and secondary overprints. The influence of alterations and the multivectorial magnetizations of overlapping spectra require detailed analysis to estimate the paleointensities. ESPAÑOL: Reportamos resultados del estudio arqueomagnético en muestras de cerámicas en el complejo arquitectónico del Edificio de las Columnas, localizado en el sector norte de El Tajín. Las mediciones de propiedades magnéticas incluyen susceptibilidad magnética, dirección e intensidad de la magnetización remanente natural, histéresis, variación de la susceptibilidad con temperatura, curvas de adquisición de magnetización isotermal y desmagnetización por campos directos de la magnetización isotermal de saturación. La composición vectorial y estabilidad de la magnetización remanente se investigaron por desmagnetización por campos magnéticos alternos y por temperatura. Las magnetizaciones muestran dos componentes que residen en titanomagnetitas y magnetita, con traslape en los espectros de

  18. En Tecnoparque SENA nodo Medellín se fusiona la ciencia y arte

    Directory of Open Access Journals (Sweden)

    Carolina Montoya

    2012-01-01

    Full Text Available Tecnoparque Colombia es una red liderada por el Servicio Nacional de Aprendizaje-SENA para la promoción del talento humano, con compromiso hacia el desarrollo tecnológico, la innovación y el emprendimiento en Colombia.  Ofrece gratuitamente las herramientas, la asesoría, la infraestructura y los expertos necesarios en un ambiente acelerador y de apropiación tecnológica, para el desarrollo de nuevas iniciativas de productos y servicios, que se puedan consolidar en empresas o nuevas líneas de negocio, fortaleciendo la productividad y competitividad del país. Las áreas tecnológicas en las que se enfoca la red son tecnologías virtuales, electrónica, diseño de producto, biotecnología, agroindustria y  un componente transversal en emprendimiento de base tecnológica..

  19. El Estudio Paramental en el Modelo de Información del Edificio Histórico o “Proyecto HBIM”

    Directory of Open Access Journals (Sweden)

    Juan Enrique Nieto Julián

    2014-10-01

    Full Text Available El Modelado de Información para la Construcción (BIM se ha convertido actualmente en un sistema colaborativo que beneficia enormemente a las industrias involucradas en el sector AEC. La esencia del BIM es ser un núcleo contenedor con información gráfica y alfanumérica, donde cada disciplina participativa vuelca sus conocimientos para adaptarse a las singularidades del edificio de forma coordinada con los demás agentes intervinientes. Si este mismo escenario lo trasladamos al Patrimonio, veremos que las necesidades serán las mismas; el arqueólogo, el arquitecto, el historiador, el ingeniero o el restaurador se encuentran en la misma encrucijada a la hora de trasmitir sus hipótesis y someterlas a debate antes de la aprobación. En el artículo se expondrá una metodología eficaz para implementar el estudio estratigráfico de paramentos. La intención es volcar la información recabada en la fase de auscultación en un único modelo gráfico, operativo desde las diferentes disciplinas y que permita interoperacionalizar datos evitando duplicaciones superfluas y contradictorias. Se constituirá un proyecto de intervención sustentado en un Modelo de Información Patrimonial o del Edificio Histórico, que podemos denominar Proyecto HBIM.

  20. Valoración de la Infraestructura de los Edificios Religiosos para el Turismo Accesible en Villahermosa, Tabasco, México

    Directory of Open Access Journals (Sweden)

    Lidia Guillén Valencia

    2015-01-01

    Full Text Available Los turismos religioso y accesible han promovido conciencia social, aprendizaje y salud en todos sus aspectos, y han generado una considerable derrama económica debido al desplazamiento masivo de sus practicantes. No obstante, el turismo accesible ha encontrado una serie de obstáculos arquitectónicos para acceder a los templos. Por tal razón, fueron valorados antropometricamente los edificios religiosos de Villahermosa, Tabasco, México, para determinar si su infraestructura es incluyente con este tipo de turistas. Se caracterizaron los templos, se entrevistaron informantes clave y se disenso una matriz de evaluación considerando los trece criterios antropometricos de Gutiérrez y Buenfil (2005. El resultado fue que los siete templos valorados cumplen de manera parcial con los requisitos de accesibilidad, esto significa que las necesidades de los turistas no fueron consideradas apropiadamente. Es pertinente aplicar la normatividad para la adecuación de la infraestructura y equipamiento no solo de este tipo de edificios sino para cualquiera.

  1. Evaluación higrotérmica y energética de un edificio escolar perteneciente al programa nacional 700 escuelas, en el área Metropolitana de San Juan, Argentina.

    Directory of Open Access Journals (Sweden)

    María Guillermina Re

    2016-12-01

    Full Text Available El objetivo de este trabajo es evaluar el comportamiento higrotérmico y energético anual de un edificio escolar perteneciente al Programa Nacional 700 Escuelas, en el Área Metropolitana de San Juan, Argentina. Para ello, se efectúa el cálculo estacionario aplicando las Normas IRAM y se procesan los monitoreos realizados en tres momentos claves de los años 2013 y 2014, con el edificio en condiciones reales de ocupación, los cuales se relacionan con lecturas diarias de consumo energético. Adicionalmente, se estudian los niveles de confort en tres aulas mediante el método Fanger, determinando con un software específico los índices PMV y PPD. Por último, se computan los consumos históricos eléctricos y de gas, y se calculan los valores por unidad de superficie, que se comparan con antecedentes nacionales y estándares internacionales. El análisis llevado a cabo, a partir de la consideración de datos teóricos y empíricos, permite concluir que con un consumo anual promedio de 88 kWh/m2 el edificio cumple estándares internacionales de eficiencia energética escolar, sin embargo, su desempeño térmico es deficiente en las estaciones frías y cálidas, con ambientes que escapan de la zona de confort gran parte del tiempo. 

  2. Las envolventes constructivas en la construcción no convencional de edificios del nordeste argentino y el problema de los puentes térmicos.

    Directory of Open Access Journals (Sweden)

    Manuel Venhaus Held

    2017-06-01

    Full Text Available Este trabajo analizó el comportamiento térmico de las envolventes de edificios en el Nordeste Argentino (NEA, cuyos sistemas constructivos emplean materiales prefabricados elaborados en serie y mano de obra especializada, atendiendo particularmente al impacto de los puentes térmicos. El objetivo fue diagnosticar y desarrollar criterios de optimización del desempeño energético de estas envolventes. Se estudiaron, para ello, los tipos y subtipos de construcciones no convencionales y se seleccionaron muestras de aquellos más empleados en el NEA. Éstas fueron evaluadas con los procedimientos de cálculo establecidos por las normas IRAM, de la serie 11.600, así como también mediante simulaciones realizadas con el software THERM. Los valores que pudieron obtenerse con ambos procedimientos presentaron discrepancias promedio del 2,6%. Con el software es posible obtener un coeficiente ponderado de transmitancia que incorpora muro opaco y puente térmico y, con la graficación del flujo de calor a través del cerramiento, reconocer fácilmente los puntos más críticos, para concentrar las acciones de optimización en ellos.  Documeto ejecutado bajo en proyecto "Rehabilitación higrotérmico-energética de edificios en el NEA: evaluación, diagnóstico, desarrollo de soluciones técnico constructivas y valoración costo-beneficio. Calificación energética de la edificación". Acreditado por la Secretaría General de Ciencia y Técnica de la Universidad Nacional del Nordeste - SGCyT-UNNE, Corrientes, Argentina. Resolución Nº 0155/2015-CS-UNNE 2015. Código del Proyecto: C001/2014.

  3. Tratamiento de los edificios contra la humedad del terreno

    Directory of Open Access Journals (Sweden)

    Gómez Rodríguez, P. J.

    1966-07-01

    Full Text Available This paper entions the main damage that may arise from excessive dampness in building materials. One of the main sources of this humidity is the rising of water through capillarity from the ground, and across foundations and walls. Soil water may be of two kinds (disperse and freatic, and criteria are given for recognising each type. As a matter of information, the paper finally mentions the methods that are utilised to counteract the above type of humidity. These methods are termed preventive, when they are applied during the construction of the building; and curative, if undertaken after the building has been completed.Se indican en el presente artículo los principales daños que puede producir el exceso de humedad en los materiales de construcción, estableciendo, como una de las causas fundamentales, la ascensión capilar del agua del suelo a través de cimientos y muros. El agua existente en el terreno puede ser de dos tipos (dispersa y freática y se dan criterios para su reconocimiento. A continuación se indican, a título informativo, los diferentes procedimientos que se utilizan para defenderse de este tipo de humedades, clasificándolos, por su aplicación, ya sea durante la construcción del edificio (soluciones preventivas o posteriormente a ella (soluciones curvativas.

  4. Edificio del Ilustre Colegio de Registradores de la Propiedad, en Madrid, España

    Directory of Open Access Journals (Sweden)

    Azpiazu Ordóñez, J. R.

    1966-05-01

    Full Text Available This building has a basement, ground floor, seven additional floors, and an attic. The basement is occupied by the heating and air conditioning installations, the electricity meters the archive of the registrars, and houses for the doorman and porter. On the ground floor there is an information and doorman's booth, a map of Spain with the zones covered by each registrar, the hall, lifts, stairs, whilst the rest of the floor is devoted to commercial activities. The first floor belongs to the Registrars' College, and the 2nd, 3rd, 4th, 5th and 6th floors have been allocated to the offices of all the property registrars of Madrid. The 7th floor and the attic are offices, to be let to outsiders.El edificio consta de: sótano, planta baja, siete plantas de altura, y planta de ático. El sótano alberga los servicios de: calefacción y refrigeración, cuarto de contadores, archivo de legajos de Registros, viviendas del portero y conserje, etc. En la planta baja se encuentran: la cabina de información y estancia del portero, el mapa de Madrid con la demarcación de Registros, el hall de ascensores y escalera, etc.; el resto de la planta está ocupado por eventuales locales comerciales. La planta primera está destinada a sede del Ilustre Colegio de Registradores de la Propiedad; las plantas segunda, tercera, cuarta, quinta y sexta se han reservado para instalar todos los Registros de Madrid; y las plantas séptima y de ático se han destinado para oficinas de alquiler.

  5. Dos edificios públicos a base de tierra en Chile

    Directory of Open Access Journals (Sweden)

    Pereira, Hugo

    1986-02-01

    Full Text Available Two works in Chile are reported: The House of the Culture in La Florida (Santiago and the Botalcura Concentred School in the Vlllth Zone. Both constructions have as common characteristic to be built with adobe and wooden girders, to present a certain continuity in the adapted criteria of desing -both from Architect Hugo Pereira- and to be newly constructed buildings, even partialy in construction. The fact that there are spaces with appropriate light and height for public use, so as the circumstance that the part which waas being constructed just at the moment of the great seism in Chile (February 1985 had and excelent behaviour, makes these works interesting to be published.Se presentan dos realizaciones en Chile: la Casa de la Cultura, en la barriada La Florida (Santiago y la Escuela Concentrada de Botalcura, en la VIII Región. Ambas construcciones tienen en común el haberse realizado a base de adobe y cerchas de madera, el presentar una cierta continuidad en los criterios de diseño adoptados, en ambas ha participado el Arquitecto Hugo Pereira, y ser edificios recién construidos, incluso parcialmente en construcción. El hecho de tratarse de espacios con luces y alturas propias de construcciones para uso público, así como la circunstancia de que la parte construida de la Casa de la Cultura en el momento del último gran sismo en Chile (marzo 1985, presentase un excelente comportamiento, son hechos que hacen especialmente interesante la publicación de estas realizaciones.

  6. XII ASSEMBLEIA GERAL ORDINÁRIA DO SÍNODO DOS BISPOS SOBRE A PALAVRA DE DEUS

    Directory of Open Access Journals (Sweden)

    Johan Konings

    2009-01-01

    Full Text Available Em outubro de 2008 transcorreu em Roma a XII Assembleia Geral Ordin ária do Sínodo dos Bispos, o qual é uma instituição permanente criada pelo Concílio Vaticano II para manter o diálogo dos pastores-bispos das Igrejas particulares. Nesta Assembleia, dedicada à Palavra de Deus na vida e na missão da Igreja, foi retomada praticamente a Constituição Dogmática Dei Verbum do Vaticano II. Depois de apresentar o tema da Palavra de Deus, traçamos um breve histórico focalizando os inícios da Tradição cristã e os tempos modernos desde Leão XIII até hoje. Em seguida descrevemos a XII Assembleia Geral, especialmente a Relatio post Disceptationem e as Propositiones. Concluímos com uma reflexão teológicopastoral sobre a Revelação e a leitura bíblica, e sugestões para a prática. ABSTRACT: In October of 2008 the XII Ordinary General Assembly of the Sinod of Bishops took place in Rome. The Sinod of Bishops is a permanent institution created by the II Vatican Council in order to maintain the dialogue of pastorsbishops of the particular Churches. This Assembly, dedicated to the Word of God in the life and in the mission of the Church, basically treated again the Dogmatic Constitution Dei Verbum of the II Vatican Council. After presenting the theme of the Word of God, we outline a brief history focusing on the beginnings of the Christian Tradition and the modern epoch since Leo XIII until today. Next we describe the XII General Assembly, especially the Relatio post Disceptationem and the Propostiones. We conclude with a theological-pastoral reflection on Revelation and the reading of the bible, and some practical suggestions.

  7. El uso de humidificadores como alternativa energética al aire acondicionado: caso de un edificio docente en Santiago de Compostela

    Directory of Open Access Journals (Sweden)

    Fernando Blanco Silva

    2012-01-01

    Full Text Available El presente artículo es una propuesta para reducir la temperatura en un espacio denominado Claustro en el edificio Escuela Técnica Superior de Ingeniería, de la Universidad de Santiago (U.S.C.. Este espacio dispone de un lucernarioabierto con alta radiación solar y que en verano llega a alcanzar los 37ºC. El espacio tiene un volumen de unos 7.000 m3 y una instalación convencional de aire acondicionado es demasiado cara. Nuestra propuesta para reducir la temperatura es aumentar la humedad en el ambiente y una renovación simultánea del aire, con un coste más reducido y menos energía consumida.

  8. Comparative analysis of the indexes of electric power density in buildings lighting systems; Analisis comparativo de los indices de densidad de potencia electrica de los sistemas de alumbrado en edificios

    Energy Technology Data Exchange (ETDEWEB)

    Cruz Hernandez, J.I.; Morillon Galvez, D. [CONAE, Mexico, D. F. (Mexico)

    1995-12-31

    The national situation of the lighting systems in buildings is presented in order to know its consumption and make comparisons in accordance with the terms of the Electric Power Density that the lighting systems must satisfy, recently published in the norm, NOM 007 ENER-1995 (Energy Efficiency for non Residential Buildings` Lighting Systems). The form of application of the norm to determine the Electric Power Density Indexes in Lighting Buildings (EPDIL) is described, which permitted to know the current situation of the lighting systems, to compare the results internationally and with the ones specified in the proper norm. As a conclusion, there is the need of enhancing the efficiency of the lightning systems, with savings technologies, improve the lightning levels and equalize the energy indexes of the EPDIL with the ones recommended. [Espanol] Se presenta un estudio sobre la situacion nacional de los sistemas de alumbrado en edificios, con el objeto de conocer su consumo y compararlos, de acuerdo a los terminos de densidad de potencia electrica que deben cumplir los sistemas de alumbrado, publicados recientemente en la norma, NOM 007 ENER-1995 (Eficiencia Energetica para los Sistemas de Alumbrado en Edificios no Residenciales). Se describe la forma de aplicar la norma para determinar los indices de densidad de potencia electrica en alumbrado (DPEA) en edificios, lo cual permitio conocer la situacion actual de los sistemas de alumbrado, comparar con los reportados internacionalmente y con los especificados en la propia norma. Como conclusion se tiene la necesidad de eficientizar los sistemas de alumbrado, con tecnologia ahorradora, mejorar los niveles de iluminacion e igualar los indices energeticos de DPEA con los recomendados.

  9. Comparative analysis of the indexes of electric power density in buildings lighting systems; Analisis comparativo de los indices de densidad de potencia electrica de los sistemas de alumbrado en edificios

    Energy Technology Data Exchange (ETDEWEB)

    Cruz Hernandez, J I; Morillon Galvez, D [CONAE, Mexico, D. F. (Mexico)

    1996-12-31

    The national situation of the lighting systems in buildings is presented in order to know its consumption and make comparisons in accordance with the terms of the Electric Power Density that the lighting systems must satisfy, recently published in the norm, NOM 007 ENER-1995 (Energy Efficiency for non Residential Buildings` Lighting Systems). The form of application of the norm to determine the Electric Power Density Indexes in Lighting Buildings (EPDIL) is described, which permitted to know the current situation of the lighting systems, to compare the results internationally and with the ones specified in the proper norm. As a conclusion, there is the need of enhancing the efficiency of the lightning systems, with savings technologies, improve the lightning levels and equalize the energy indexes of the EPDIL with the ones recommended. [Espanol] Se presenta un estudio sobre la situacion nacional de los sistemas de alumbrado en edificios, con el objeto de conocer su consumo y compararlos, de acuerdo a los terminos de densidad de potencia electrica que deben cumplir los sistemas de alumbrado, publicados recientemente en la norma, NOM 007 ENER-1995 (Eficiencia Energetica para los Sistemas de Alumbrado en Edificios no Residenciales). Se describe la forma de aplicar la norma para determinar los indices de densidad de potencia electrica en alumbrado (DPEA) en edificios, lo cual permitio conocer la situacion actual de los sistemas de alumbrado, comparar con los reportados internacionalmente y con los especificados en la propia norma. Como conclusion se tiene la necesidad de eficientizar los sistemas de alumbrado, con tecnologia ahorradora, mejorar los niveles de iluminacion e igualar los indices energeticos de DPEA con los recomendados.

  10. Technological advances in zero energy buildings; Avances tecnologicos en edificios de energia cero

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez Milla, Guillermo; Perez Rebolledo, Hugo; Acoltzi Acoltzi, Higinio [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2011-07-01

    Buildings use a large amount of energy to operate and are one of the main sources of contaminating emissions. A building is a complex system and all of their components contribute to the total energy demand. The technology to construct zero-energy buildings is already available, but obstacles exist such as the lack of information and technical training of architects and engineers to design highly energy efficient buildings. The present article describes the progress to-date and the future prospects for the design and construction of zero-energy buildings, as well as the problems involved in its implementation. [Spanish] Los edificios usan una gran cantidad de energia para operar y son una de las principales fuentes de emisiones contaminantes. Un edificio es un sistema complejo y todos sus componentes contribuyen a la demanda total de energia. La tecnologia para construir edificios de energia cero ya esta disponible, pero existen barreras como falta de informacion o capacitacion tecnica a arquitectos e ingenieros, para disenar edificios de alta eficiencia energetica. El presente articulo muestra los avances a la fecha y la prospectiva para el diseno y construccion de edificios de energia cero, asi como la problematica para su implementacion.

  11. Red de nodos sensores y actuadores para control y supervisión de consumo de energía en dispositivos electrodomésticos

    OpenAIRE

    Peretti, Gastón; Gallina, Sergio Hilario; Felissia, Sergio Francisco; Villagrán, Luis Daniel; Beltramini, Paola; Herrera, Martín

    2013-01-01

    En la actualidad existen una gran variedad de sistemas domóticos que utilizan distintos protocolos para controlar los dispositivos hogareños, pero no existen desarrollos que integren la medición de energía en tiempo real de cada dispositivo y el control sobre los mismos al mismo tiempo. El presente proyecto pretende desarrollar una red de nodos sensores y actuadores configurables en tiempo real, que permitan implementar funciones de control y supervisión de consumo energético de artefactos y ...

  12. Variação nos tipos de irrigação do nodo sinoatrial em cães de diferentes raças

    Directory of Open Access Journals (Sweden)

    Phelipe O. Favaron

    Full Text Available RESUMO: Considerando a heterogeneidade anatômica e eletrofisiológica do nodo sinoatrial para a geração e propagação do potencial de ação, bem como as particularidades relacionadas a origem da sua irrigação sanguínea, este trabalho teve como objetivo analisar o comportamento das artérias envolvidas na irrigação do nodo sinoatrial em cães realizando uma análise descritiva e comparativa entre diferentes raças estudadas, detalhando a origem, o percurso e a ramescência dos vasos, assim como a eventual ocorrência de anastomoses. Ao todo analisamos resultados obtidos em 240 corações, os quais foram fixados em solução de formalina 10% e submetidos a diafanização de Spalteholz. A irrigação deste ocorre mediante colaterais oriundos do ramo circunflexo direito ou ramo circunflexo esquerdo, mostrando particularidades diferentes para cada raça. Assim, predominantemente, nas raças ora estudadas a irrigação arterial do nodo sinoatrial depende exclusivamente (63,6%, ou de anastomoses de colaterais da artéria coronária direita, havendo também participação dos ramo proximal atrial direito e intermédio atrial direito. Menos frequentemente (15,4% o suprimento sanguíneo ocorre exclusivamente por conta do ramo proximal atrial esquerdo, oriundo do ramo circunflexo da artéria coronária esquerda. Os dados aqui apresentados sobre a origem da irrigação sanguínea do nodo sinoatrial e a ramescência dos vasos envolvidos nesta tarefa representam conhecimento fundamental para o desenvolvimento da clínica-cirúrgica em cães, da patologia e trabalhos de natureza experimental.

  13. Los edificios de las bibliotecas públicas en los programas electorales (Castilla-La Mancha, 2007-2015

    Directory of Open Access Journals (Sweden)

    José Pablo Gallo León

    2017-02-01

    Full Text Available Se analizan las propuestas sobre edificios e instalaciones de las bibliotecas presentes en los programas con que los partidos políticos participaron en las elecciones de Castilla-La Mancha durante el periodo de la crisis económica, con el fin de evaluar cómo reflejan el interés social por las mismas. A pesar de la desmaterialización digital de los servicios bibliotecarios en el actual entorno híbrido, la proyección de la biblioteca pública como un servicio a la sociedad requiere de una presencialidad física que dé soporte a su actual papel como ágora, punto de intercambio socio-intelectual y de formación de la comunidad a la que sirve. Esto debería verse traducido en un interés social por los espacios bibliotecarios que puede ser testado a través de su presencia en los programas electorales, donde se ven reflejados los temas que conforman la agenda política. Concluimos que ha habido un cambio de tendencia, priorizando la reforma y aseguramiento de la apertura de los centros frente a la construcción de nuevas bibliotecas. Igualmente, se comprueba que los programas presentan una visión muy tradicional de los servicios presenciales

  14. Estudios de materiales de cátodos híbridos y ánodos vítreos. Caracterización en celdas de ion litio

    Directory of Open Access Journals (Sweden)

    Cuentas-Gallegos, A. K.

    2002-02-01

    Full Text Available This paper is based on new materials applied as electrodes in rechargeable lithium batteries. We have approached the study of glassy and hybrid materials as an alternative to crystalline active materials, which capacity is frequently limited by irreversible phase transitions. We present here our latest results on hybrid cathodes, PPy/MnO2 (PPy= PPi= polypirrol and PAni/V2O5 (PAni= polyaniline, and anodes based on glasses of V-Ni-Te-O, and their combination in reversible lithium ion batteries. We have obtained the PPy/MnO2 hybrid by direct one-pot reaction of pyrrole and permanganate, and for the preparation of PAni/V2O5 we have determined the positive influence of some parameters on the electrochemical behaviour.

    Como parte de nuestros estudios de nuevos materiales de electrodos para aplicación en celdas reversibles de litio, hemos abordado el estudio de materiales vítreos e híbridos [1] como posibles alternativas a los materiales activos cristalinos, que ven frecuentemente limitada su capacidad como resultado de transiciones de fase irreversibles. Dentro de este trabajo se presentan aquí los resultados recientes sobre cátodos híbridos de PPi/MnO2 (PPi= polipirrol y de PAni/V2O5 (PAni= polianilina, y de ánodos basados en vidrios en el sistema V-Ni-Te-O, así como de su combinación en celdas reversibles de ion litio. Hemos logrado obtener mediante reacción directa de pirrol con permanganato el híbrido PPi/MnO2, y hemos observado que en la síntesis de PAni/V2O5 existen factores que influyen positivamente en su comportamiento electroquímico.

  15. Extracción Automática de Edificios a partir de Modelos Digitales de Superficies : el sistema BUILDING

    Directory of Open Access Journals (Sweden)

    José Luis Pérez García

    2008-01-01

    Full Text Available En este trabajo se plantea una aproximación al complicado problema de la localización, extracción y representación vectorial de manera semiautomática de edificaciones situadas en zonas urbanas o suburbanas, a partir del análisis de modelos de superficie, lo suficientemente densos como para representar la escena urbana, y de imágenes aéreas orientadas de la zona de estudio. Elmétodo propuesto utiliza como información de partida losmodelos digitales de superficie generados de forma automáticamediante técnicas fotogramétricas o de sistemas LIDAR con una densidad demalla elevada, así como de un modelo previo de forma geométrica de los edificios existentes en la zona. Estos modelos de superficie, serán tratados mediante operaciones de morfología matemática para la diferenciar los puntos que pertenecen al terreno propiamente dicho, de los pertenecientes a objetos situados sobre él, así como por momentos geométricos invariantes para obtener el rectángulo representativo del objeto localizado. Una vez localizados los posibles edificios, así como los rectángulos que representan a cada uno de ellos, se procederá a refinar estos resultados trabajando sobre los fotogramas aéreos correspondientes. Mediante análisis digital de imágenes se realizará una extracción de bordes y con la ayuda de la transformada de Hough se obtendrá el rectángulo principal de la imagen. Este rectángulo junto con la altura delmismo extraída en la fase anterior, formará el prisma de base rectangular que representará al edificio. Todas estas operaciones han sido implementadas en un sistema de desarrollo propio, el sistema BUILDING, cuyos resultados iniciales son presentados en este trabajo para poner de manifiesto las posibilidades y problemas de la metodología propuesta.In this work we present an approximation to the complicated problem of the semiautomatic location, extraction and vector representation of buildings. This approximation is based on

  16. Medidas de mejora de la eficiencia energética de edificios residenciales

    OpenAIRE

    Hernández Sánchez, Juan Manuel

    2012-01-01

    El parque de edificios residenciales existente tiene un potencial muy grande para mejorar la eficiencia energética a corto y medio plazo, debido al gran número de viviendas existentes y a su larga vida residual. Los factores que influyen directamente en el consumo energético y en las emisiones asociadas a los edificios residenciales son: la envolvente térmica, la eficiencia energética de los equipos, las fuentes energéticas utilizadas y el comportamiento de los usuarios. Las barreras qu...

  17. DESPACHO ECONOMICO UTILIZANDO PROGRAMACIÓN LINEAL, CON PASOS CONTROLADOS

    Directory of Open Access Journals (Sweden)

    Manuel Barroso Baeza

    2011-02-01

    Full Text Available Se muestra en este trabajo un modelo y algoritmo a través del cual se puede mejorar la soluciónobtenida con el uso de la programación lineal, partiendo de funciones de costos cuadráticas pornodo, sin necesidad de linealizar de forma explícita tales funciones.Se muestran resultados obtenidos con el caso de 30 nodos de la IEEE .  This work deal of an algorithm and model development in order to improvement the solutionobtained with the lineal programming use employing the quadratic cost function by node, thenit is not necessary to obtain several lineal segment for each curve.

  18. Concepción abstracta, edificio FIUC 1956 - 1967

    Directory of Open Access Journals (Sweden)

    Cristián Berríos Flores

    2005-12-01

    El presente escrito se desarrolla por medio de dos entrevistas efectuadas por e-mail desde Barcelona al arquitecto Osvaldo Cáceres, con las limitaciones que pueden originarse al no ser realizadas "en vivo y en directo".

  19. la Universidad nodo

    Directory of Open Access Journals (Sweden)

    Mauricio Andión Gamboa

    2004-01-01

    Full Text Available Este artículo abunda en el concepto de Universidad como organización social, haciendo énfasis en el papel que cumple la difusión de la cultura universitaria como principio en torno al cual se articula la Universidad contemporánea. Para ello, se analizará la relación que existe entre las universidades y las industrias culturales, tal como se conciben en la actualidad. También se explica cómo la difusión se ha transformado en un servicio de extensión académica, y cuál ha sido el proceso de incorporación de las universidades mexicanas en el campo mediático. Finalmente, se apuntan las principales implicaciones de la difusión como medio de enlace de las universidades a la sociedad red.

  20. A perseguição a luteranos durante as décadas de 1930 e 1940 no Brasil: o caso do Sínodo de Missouri no Rio Grande do Sul

    Directory of Open Access Journals (Sweden)

    Sergio Luiz Marlow

    2014-03-01

    Full Text Available O presente artigo procura demonstrar que as décadas de 1930 e 1940 foram de extrema dificuldade para os sínodos luteranos que haviam se instalado desde o século anterior em território brasileiro. Especialmente em virtude da chamada Campanha de Nacionalização do Governo de Getúlio Vargas associada à entrada do Brasil na Segunda Guerra Mundial contra o Eixo composto por Alemanha, Itália e Japão, os sínodos luteranos foram acusados de não desejarem “abrasileirar-se”, antes seguindo os ditames do Nacional Socialismo Alemão. O artigo pretende analisar os efeitos da política de Vargas sobre o chamado Sínodo de Missouri, proveniente dos Estados Unidos, no Rio Grande do Sul, que, apesar de trabalhar com teuto-brasileiros, sem, contudo, defender a questão da Germanidade como de sua esfera de atuação, foi perseguido e sofreu as consequências do período. A análise se dará com base em documentos de autoridades brasileiras da época, bem como na reação do Sínodo de Missouri que declarava estar se nacionalizando e seguindo as orientações do governo brasileiro.

  1. Simulación de eventos discretos y líneas de balance, aplicadas al mejoramiento del proceso constructivo de la cimentación de un edificio

    OpenAIRE

    Gomez, Adriana; Ávila Díaz, Jorge Orlando; Quintana Pulido, Natalia

    2014-01-01

    El objeto de este trabajo fue establecer propuestas de mejoramiento al proceso de planeación de tiempos y costos en la etapa de cimentación de un edificio, a partir de la integración de herramientas como simulación de eventos discretos, programación con líneas de balance y metodologías Building Information Modeling – BIM -- A partir de mediciones en campo se levantó información para la elaboración de un modelo de simulación de eventos discretos que imitara el proceso constructivo real -- Se p...

  2. Determinación de variables cualitativas como factores claves en la programación de los proyectos de edificios en altura, región Coquimbo, Chile.

    OpenAIRE

    Oscar Contreras; Ronnie Kauer

    2015-01-01

    En el presente trabajo se realiza un análisis y se determina en términos cualitativos los factores claves que inciden en la adecuada programación de las duraciones de las actividades en los proyectos de construcción de edificios en altura en la ciudad de Coquimbo, Chile. El análisis profundiza el estudio y desarrollo del modelo estocástico pert/cpm modificado aplicado con antelación, del cual nace la búsqueda de explicaciones de las desviaciones obtenidas, encontrándose, variables del tipo cu...

  3. El "martyrium" de la Epístola XXV de Gregorio de Nisa. Nueva propuesta de restitución de edificio

    Directory of Open Access Journals (Sweden)

    Sergio Vidal Álvarez

    2013-07-01

    Full Text Available A partir de la información que nos proporciona la Epístola XXV de Gregorio de Nisa (335-394/5 d.C., se pretende restablecer el sistema de proporciones que pudo regir al martyrium que Gregorio pretende construir en Nisa (Capadocia y del que no se conoce ninguna otra información. Según se indica en la epístola, el edificio debe seguir un esquema en planta de cruz griega con octógono central y cubierta cupulada, además de un peristilo, siguiendo los parámetros propios de la arquitectura cristiana martirial de la época. 

  4. Edificio ex Estación de FF CC y actual sede del Gobierno, Región del Bío-Bío

    Directory of Open Access Journals (Sweden)

    Alfredo Palacios Barra

    2007-11-01

    Full Text Available Del período de la arquitectura Modernista, el edificio de la ex Estación de Ferrocarriles de Concepción, construído el año 1941, es obra del arquitecto Luis Herreros. De proporciones nobles y fachada austera, la distribución y concepción urbanística de la obra, compone un volumen horizontal de 4 pisos que logra un equilibrio a nivel de conjunto, con un eje vertical de una pronunciada torre de 24 m de altura. Este hito, constituye un importante referente urbano ubicado en la perspectiva de la ex calle Comercio, hoy Barros Arana y próximo Eje Bicentenario de Concepción, la más importante vía comercial de la ciudad.

  5. REDUCCIÓN DE VIBRACIONES EN UN EDIFICIO MEDIANTE LA UTILIZACIÓN DE AMORTIGUADORES MAGNETOREOLÓGICOS

    Directory of Open Access Journals (Sweden)

    LUIS A. LARA V.

    2012-01-01

    Full Text Available Uno de los dispositivos de control semi-activo más prometedor es el amortiguador magnetoreológico (MR, el cual se compone de un cilindro hidráulico, bobinas magnéticas y un fluido estimulable, denominado fluido magnetoreológico, cuya principal particularidad es su habilidad para variar, de manera reversible, de un estado liquido lineal viscoso de libre flujo para un estado semi-sólido en apenas milisegundos, cuando es expuesto a un campo magnético. Esta peculiaridad hace de los amortiguadores MR una herramienta ideal para el control de sistemas estructurales, pues con ellos es posible administrar fuerzas de amortiguamiento de forma simple, rápida y segura a un costo relativamente bajo. En el presente trabajo se analiza la respuesta estructural de un edificio tipo pórtico de dos pisos controlado por un par de amortiguadores MR administrados por un regulador lineal cuadrático (LQR asociado a un algoritmo de selección de señal de comando desarrollado en el controlador clipped optimal. Los resultados obtenidos mostraron reducciones superiores al 49% y 76%, respectivamente, de picos de respuesta y de valores RMS de respuesta.

  6. Eficiencia energética de los edificios: repercusión medioambiental

    Directory of Open Access Journals (Sweden)

    Maria Nieves Pacheco Jiménez

    2009-06-01

    Full Text Available Los recientes Planes, Estrategias y normas atinentes al fomento de la eficiencia energética en los edificios1 nacen en un contexto de preocupación por el cambio climático y sus consecuencias. Todos ellos persiguen la reducción de costes energéticos y la promoción de la sostenibilidad económica, política y ambiental. Un reflejo de esta inquietud por el bajo impacto ambiental puede observarse en el sector de la vivienda, cuyo consumo final de energía es muy elevado, y en la consiguiente intención de construir edificios bioclimáticos que aprovechen la energía del entorno. En aras a la consecución de estos objetivos, el Plan de Acción 2008-2012 impulsa una serie de medidas que recaen sobre el sector transporte, la industria, el sector residencial y el sector terciario, articulándose en torno a cuatro líneas de actuación: transversal, de movilidad, de edificios y de ahorro eléctrico. Este estudio aborda las pautas de ahorro y eficiencia energética propuestas para los edificios, tanto existentes como de nueva construcción, así como residenciales y del sector terciario. Para ello se hace imprescindible la remisión al concepto de “calidad” de los edificios, contemplado en la propia Exposición de Motivos de la Ley 38/1999, de Ordenación de la Edificación, y ligado estrechamente a la eficiencia energética de aquéllos.

  7. Transmisión de cargas entre forjados y puntales en un edificio de forjado reticular de casetón perdido utilizando clareado

    Directory of Open Access Journals (Sweden)

    Gasch, I.

    2013-06-01

    Full Text Available This paper presents the results of tests carried out during the construction of a building of flats with cast-in-place girderless hollow floor slab in Sabadell, Spain, using the shoring, clearing and striking (SCS process. Loads on shores were recorded during the different construction stages of floor slabs 1 to 6. The two first floor slabs had geometry different than the rest. The experimental results were used to analyse load transmission between slabs and shores during the construction of the building with a SCS process. The experimental results were compared with those obtained applying simplified methods that consider the real stiffness of the shoring, obtaining that the method with a better fit was the New Simplified Procedure.En el presente artículo se presentan los resultados de la instrumentación llevada a cabo durante la construcción de un edificio de viviendas resuelto con forjados reticulares de casetón perdido situado en Sabadell (España, en el que se ha empleado un proceso de cimbrado, clareado, descimbrado (CCD. Se han registrado las cargas debidas a las operaciones constructivas de CCD en puntales de los seis primeros forjados. Dichos registros han permitido analizar la transmisión de cargas entre forjados y puntales durante la construcción de este edificio, teniendo un proceso de CCD. El análisis de las medidas experimentales ha permitido concluir que la transmisión de cargas entre forjados y puntales difiere según las condiciones de contorno del vano estudiado. Asimismo, se han comparado las medidas experimentales con diversos métodos simplificados que permiten simular la operación del clareado, obteniendo que el método que mejor se ajusta es el Nuevo Procedimiento Simplificado.

  8. Reinforced Concrete Buildings Following NSR-10 vs Quetame Earthquake Registered on Bogotá D.C. Edificios de concreto reforzado siguiendo la NSR-10 vs sismo de Quetame registrado en Bogotá D.C.

    Directory of Open Access Journals (Sweden)

    D M Ruiz

    2012-12-01

    Full Text Available A three dimensional nonlinear dynamic analysis of 6 concrete reinforcedbuildings of 5, 12 and 20 stories, designed according to NSR-10 and seismicresponse zoning for Bogotá 2010 version is presented. These 6 buildings weresubjected to 78 seismic signals of the Quetame earthquake (2008 registeredin 26 stations of the Bogotá’s accelerometer array (RAB. “Piedmont-B” and“Lacustrine-500” absolute acceleration design response spectra from the seismic response zoning of Bogota (2010 were used to design buildings analyzed.Plastic hinges were defined and assigned to each of the structural elementsof the 6 buildings, and for columns the interaction diagrams were establishedtoo. With these nonlinear parameters, the 6 structures were subject simultaneously to the time history registers North-South, East-West and vertical.For each building and for each seismic register the performance levels, the interstory drifts, roof displacements and base shear demanded were determined.With this information seismic demand maps were plotted for Bogota for eachone of buildings. The results suggest that, buildings designed under the newrules to Bogotá and provisions of NSR-10, develop strong damage level, related to limit states, such as: “llife security” for low-magnitude quake, was theQuetame earthquake, so far, from the design scenario.Se presenta el análisis no lineal dinámico en tres direcciones de 6 edificiosde concreto reforzado de 5, 12 y 20 pisos, diseñados con la NSR-10 yla zonificación de respuesta sísmica de Bogotá del año 2010. Estos 6 edificios,con planta típica idéntica, fueron sometidos a 78 señales sísmicas del sismo deQuetame (año 2008 registradas por 26 estaciones de la red de acelerógrafosde Bogotá (RAB. Para el diseño de los edificios se utilizaron los espectros derespuesta de aceleración absoluta para las zonas: «Piedemonte-B» y «Lacustre-500» de la microzonificación sísmica de Bogotá. Posteriormente, se

  9. Morteros acumuladores con parafinas microencapsuladas para el aprovechamiento de la energía solar en suelos radiantes

    OpenAIRE

    Zetola Vargas, Vicente Andrés

    2013-01-01

    Esta Tesis plantea la pregunta de si el uso de morteros con parafinas microencapsuladas combinado con colectores solares térmicos puede reducir el consumo de energías convencionales, en un sistema tradicional de suelo radiante. Se pretende contribuir al conocimiento acerca del efecto que produce en el edificio, el calor latente acumulado en suelos radiantes, utilizando morteros de cemento Portland con material de cambio de fase (PCM), en conjunto con la energía solar. Para cumplir con este pr...

  10. Edificio de oficinas. Gualca – Sire, Turín

    Directory of Open Access Journals (Sweden)

    Casalegno, G.

    1958-09-01

    Full Text Available Aunque puede considerarse como una unidad arquitectónica, puesto que constituye una sola manzana, en realidad está dividido en dos partes casi iguales: una, orientada al mediodía, propiedad de la sociedad "Gualca", proyectada por Casalegno y dedicada a departamentos de alquiler, y otra, propiedad de la sociedad "Sire", con proyecto de Ceresa y Levi-Montalcini.

  11. Estimated potential of energy saving and reduction of the demand commercial buildings illumination; Potencial estimado de ahorro de energia y reduccion de la demanda en iluminacion de edificios comerciales

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Gomez, Victor Hugo; Morillon Galvez, David [Posgrado en Energetica de la DEPFI-UNAM, Mexico, D. F. (Mexico)

    1999-07-01

    In this paper the estimated energy saving potential in illumination, the energy end use and the technology used in commercial buildings of different use is analyzed. Estimation that departs from information of the Fideicomiso para el Ahorro de Energia (FIDE) demonstrative cases, presents the energy saving and the demand reduction in a sample of 29 buildings, among which are shopping malls, hospitals, schools, hotels, restaurants and public buildings in which energy saving programs have been carried out, with measures such as the cleaning of the luminaries and its replacement for more efficient ones. The average saving obtained is of 21.81%, in the following areas: illumination, air conditioning and others. In addition, in a sample of 4 buildings, it was observed that before applying the energy saving programs, two of them did not fulfill with the norm NOM-007-1995 (electric power density in interior lighting systems W/m{sup 2}) and later did fulfill the values and criteria of the norm. [Spanish] En el presente trabajo se analiza el potencial estimado de ahorro de energia en iluminacion, el uso final de la energia y la tecnologia empleada en edificios comerciales de uso distinto. Estimacion que parte de la informacion de los casos demostrativos del Fideicomiso para el Ahorro de Energia (FIDE), se presenta el ahorro y reduccion de la demanda en una muestra de 29 edificios, entre los que se tienen centros comerciales, hospitales, escuelas, hoteles, restaurantes y edificios publicos en los cuales se ha llevado a cabo programas de ahorro de energia, con medidas como la limpieza de las luminarias y su remplazo por otros mas eficientes. El ahorro promedio obtenido es de 21.81%, en las siguientes areas: iluminacion, aire acondicionado y otros. Ademas, en una muestra de 4 edificios, se observo que antes de aplicar los programas de ahorro de energia, dos no cumplian con la norma NOM-007-ENER-1995 (densidad de potencia electrica en alumbrado interior W/m{sup 2}) y

  12. Edificio en La Plaza Lesseps de Fernando Lesseps – Barcelona

    Directory of Open Access Journals (Sweden)

    Danés, Albert

    1975-02-01

    Full Text Available This interesting example of urban architecture is situated in Barcelona, facing two streets of different widths, for which reasons the number of floors on the two sides is also different. The basements are reserved for parking space. Further the building comprises commercial ground floors with very attractive shopping arcades; a mezzanine commercial floor as well and the top floors, that are intended for housings. Pleasant exterior with solid colours. The work has been achieved thanks to the valuable contribution of Lluciá Navarro i Rodón.Esta interesante muestra de la arquitectura urbana está emplazada en Barcelona, con fachadas a dos calles de anchura diferente, por lo que el número de plantas es también distinto. Sótanos destinados a estacionamiento de vehículos. Plantas bajas comerciales, con galerías de paso muy atractivas. Entresuelo, también comercial, y plantas altas de viviendas variadas. Tratamiento exterior atrayente, a base de colores sólidos y sistema esgrafiado, contando con la valiosa colaboración de Lluciá Navarro i Rodón.

  13. Privacidad vs eficiencia. El desdoblamiento de la superficie interior en los edificios de habitación colectiva en el Movimiento Moderno

    Directory of Open Access Journals (Sweden)

    Dr. Arq. Fernández Alejandro Pérez-Duarte

    2012-11-01

    Full Text Available Dentro de las principales estrategias del Movimiento Moderno aparece de forma insistente el llamado «planeamiento en sección»: células habitacionales encajadas dentro de edificios con pisos dislocados en vertical. Utilizando las palabras de Wells Coates, el apartamento tradicional –flat– evolucionó en modelos diferentes, con soluciones de más de un andar –not flat–. Las ventajas de esta estrategia fueron múltiples, desde una mayor eficiencia del espacio al disminuir las circulaciones colectivas hasta la minimización de la transmisión de ruidos entre apartamentos vecinos. Probablemente, el modelo más clásico es el de la Unité d’Habitation de Marseille (1947-1952 de Le Corbusier. Sin embargo, antes y después de éste, fueron construidos innúmeros ejemplares, particularmente en América, que mostraron geometrías aún más intrincadas y complejas. En este artículo de presentan varios de estos modelos con la idea que fue su base y se pone el foco en algunos casos publicados en revistas especializadas, de lo cual surge lo que podría llamarse una línea de trabajo.

  14. Certificación energética de edificios en España y sus implicaciones económicas

    Directory of Open Access Journals (Sweden)

    Ruá, M. J.

    2012-09-01

    Full Text Available Under the European Energy Performance of Buildings Directive, the Member States must develop methods to certify energy efficiency of buildings. Calener-VYP v1.0 is the only Spanish official tool to certify a high energy efficiency performance of residential buildings, through the general option. It has two indicators implemented, CO2 emissions and primary energy consumption. However, in the process of energy rating a building, only the CO2 emissions indicator is considered. The economic consequences of this are studied, by means of simulating real properties with different construction assemblies and building services in the twelve Spanish climatic zones and calculating their costs. The results show that having a better energy rate in Calener VYP does not necessarily entail a lower consumption cost. Therefore, it is necessary to include the annual primary energy consumption indicator, because its absence involves that costs cannot be used as an argument when promoting energy efficiency among users.

    Bajo la Directiva Europea sobre eficiencia energética de los edificios, los Estados Miembros deben desarrollar procedimientos para certificar energéticamente los edificios. Calener-VYP v1.0 es la única herramienta oficial española para certificar una elevada aptitud en eficiencia energética de edificios residenciales, por el método general. Tiene dos indicadores implementados, emisiones de CO2 y consumo de energía primaria. Sin embargo, en el proceso de otorgar la calificación energética, solamente se consideran las emisiones de CO2. Las implicaciones económicas de esto se estudian simulando viviendas con diferentes características constructivas e instalaciones en las doce zonas climáticas españolas y calculando sus costes. Los resultados muestran que una mejor calificación energética en Calener-VYP no implica necesariamente un menor coste de consumo energético. Por tanto, es necesario

  15. La refrigeracion nocturna en edificios de oficinas optimizacion del sistema mecanico

    NARCIS (Netherlands)

    Lain, M.; Hensen, J.L.M.

    2007-01-01

    En muchas ocasiones se ha tratado sobre la necesidad de optimizar el sistema mecánico nocturno de refrigeración. En este documento se trata de la utilización de simulaciones por ordenador tanto para el apoyo al diseño de un edificio nuevo y desarrollo de un sistema HVAC, como para la optimización de

  16. Construction components and energy efficiency in buildings; Componentes de construccion y eficiencia energetica en edificios

    Energy Technology Data Exchange (ETDEWEB)

    Bansal, N.K.; Bhandari, M.S.; Kummar, P.S. [Centro para el Estudio de Energia, Instituto Hindu de Tecnologia, Hauz Khas, Nueva Delhi (Indonesia)

    2005-01-15

    An energy efficiency analysis to a set of buildings was made in India to quantify the effects of the individual design concepts with respect to the energy system in general. The saving potential of energy of different concepts as well as the orientation, windows, air cavities, insulation, etc. was quantified for the different climatic conditions that prevail in most of the Central India regions. It is demonstrated that the specific requirement of heat energy can be reduced to 300 kWh/m{sup 2} a (U{sub edifice} = 2.13 W/m{sup 2} K) for a building of normal construction up to 143 kWh/m{sup 2} a (U{sub edifice} = 0.95 W/m{sup 2} K) when using ceiling insulation and walls and by means of the use of double glass windows. [Spanish] Se realizo el analisis de eficiencia de energia a un conjunto de edificios en la India, para cuantificar los efectos de los conceptos individuales de diseno respecto al sistema de energia en general. El potencial de ahorro de energia de distintos conceptos, como la orientacion, ventanas, cavidades de aire, aislamiento, etc. fue cuantificado para las distintas condiciones climaticas que prevalecen en la mayoria de las regiones de India central. Se demuestra que el requerimiento especifico de energia calorifica puede ser reducida de 300 kWh/m{sup 2} a (U{sub edificio} = 2.13 W/m{sup 2} K) para un edificio de construccion normal hasta 143 kWh/m{sup 2} a (U{sub edificio} = 0.95 W/m{sup 2} K) al usar un aislante en el techo, paredes y mediante el empleo de ventanas de doble vidrio.

  17. Edificio de la Northrop Corporation's Ventura Division, en California – (U.S.A.

    Directory of Open Access Journals (Sweden)

    Martin, Albert C.

    1968-09-01

    Full Text Available The project includes the following: and administrative building, with the high ranking executives' offices, the financing and marketing sections, the departments of rents and those of public relations and industry; the engineering services building, which, in addition to offices, has design halls, a specialised library and other services; and the various laboratories. This set of buildings is most attractive externally, and is an audacious design, reflecting the future looking attitude of the firm.El conjunto construido comprende; el edificio de la administración, que alberga las oficinas de los altos empleados; las secciones de financiación y marketing de la Empresa, de rentas, relaciones públicas e industriales, etc. El edificio de los servicios de Ingeniería, que contiene, además de su zona correspondiente de oficinas, salas de diseño, una biblioteca especializada, etc.; y por último, adyacentes al edificio de fabricación, están los diversos laboratorios. Este conjunto resulta atractivo para el que lo contempla, constituye un ejemplo de proyecto atrevido y refleja la naturaleza futurista de la Compañía.

  18. Nuevo edificio Consejo Municipal de Colonia - Alemania Federal

    Directory of Open Access Journals (Sweden)

    Schürmann, Joachim

    1975-03-01

    Full Text Available Fundamental requirements: capacity for a working staff of 150 persons, central services (dining room, conference rooms, library, the porter's living quarters, garage and possibility of enlargement of the ground floor, in addition to trying to adapt the building in a suitable and homogeneous manner to the environment, which consists of low houses sourrounded by gardens. The building consists of 6 floors above ground level, which contain: the halls, reception, archive, conference and exhibition rooms, management, library and airconditioning and central heating installations on the top floor. The basement comprises; garage, storehouses, archives, bar, etc. Modulated construction with isolated ceilings and windows with double glass panes. It has been tried to preserve as many of the trees as possible.Premisas fundamentales: capacidad para 150 puestos de trabajo, servicios centrales comunes (comedor, sesiones, biblioteca, vivienda del portero, garaje y posibilidad de ampliación en planta baja, además de procurar una acertada y homogénea inserción en el entorno, constituido por viviendas de poca altura rodeadas de jardín. Consta de seis plantas sobre el nivel del suelo, en las que se distribuyen: los vestíbulos, recepción, archivo, salas de conferencias y de exposiciones, gerencia, biblioteca e instalaciones de refrigeración y calefacción en la más alta. El sótano contiene: el garaje, almacenes, archivos, bar, etc. Construcción modulada, con forjados aislados y ventanas con lámina doble de cristal. Se ha procurado conservar la mayor parte de los árboles existentes.

  19. Seguridad residual en los forjados con corrosión severa

    OpenAIRE

    VERCHER SANCHIS, JOSÉ MARÍA

    2013-01-01

    En muchos casos de forjados con patología severa se observa que no existen daños importantes en los elementos constructivos. Incluso con todos los nervios con la armadura inferior corroída en muchas ocasiones no hay una fisuración alarmante ni de solados ni de tabiquería. Esta investigación analiza los mecanismos resistentes que colaboran y evalúa la seguridad remanente para los casos de corrosión en los forjados más habituales en los edificios de viviendas: los forjados unidireccionales...

  20. El tiempo equivalente de exposición al fuego en un edificio histórico

    Directory of Open Access Journals (Sweden)

    Orta, Belén

    2010-12-01

    ño, la ventilación, el material estructural, las medidas activas de lucha contra el fuego, etc.. En la mayor parte de los proyectos se optará por la primera vía, sin embargo cuando se trate de un edificio que por su singularidad requiera un análisis más pormenorizado, se recurrirá a la segunda. Este artículo expone la dificultad de aplicar el método del tiempo equivalente en base al CTE sin consultar el Eurocódigo-1 (EC-1 o manuales técnicos. Se expone hasta dónde llega la norma española y cuando hay que acudir a la europea. Se aplica el método a un ejemplo concreto, un espacio en dos alturas con un hueco horizontal en cubierta. Además se muestra como el método del tiempo equivalente, como alternativa, puede generar una serie de resultados con una amplia dispersión de valores obtenidos a partir de la cantidad de decisiones que la normativa permite en función de unos criterios que no son rígidos. Esta diversidad de resultados puede dejar perplejo al calculista no docto en el asunto. Para finalizar se extraen conclusiones sobre los valores obtenidos y se reflexiona sobre la aplicación del método y la responsabilidad del técnico.

  1. Edificio de protección de las termas romanas de Sant Boi de Llobregat (Barcelona, España

    Directory of Open Access Journals (Sweden)

    González Moreno-Navarro, A.

    1999-10-01

    Full Text Available The roman baths at Sant Boi de Llobregat were built sometime around the year 200 BC and came to light in 1953. They are some of the best baths of this type to be found preserved in Catalonia. Some of the walls are almost five meters high, which is rare. There were originally seven rooms, and interesting remains of six of them can still be seen today. The baths were virtually abandoned in 1975, but restoration began in 1988, including the construction of a building to protect them and to enable the public to visit them. The design of the presentation trusts entirely to the emotion felt on seeing these ruins at first hand, and other elements, such as audio-visual effects or virtual reality, have been rejected.

    Las termas romanas de Sant Boi de Llobregat, construidas hacia el año 200 dC y descubiertas en 1953, son una de las instalaciones de este tipo mejor conservadas de Cataluña. Algunos de los muros alcanzan casi cinco metros, hecho poco habitual, y se mantienen seis de las siete salas de las que constaron, con restos muy interesantes. Casi abandonadas desde 1975, en 1988 se inició su recuperación definitiva y la construcción de un edificio que las protegiera y permitiera la visita pública. En su presentación se ha confiado toda la emoción del espectador a la contemplación directa de las ruinas y se ha renunciado a artificios, como audiovisuales efectistas o realidad virtual.

  2. CAAD en la conservación de edificios históricos

    Directory of Open Access Journals (Sweden)

    Kurmann, David

    1996-08-01

    Full Text Available In this paper we will discuss the possible contributions of CAAD -Computer Aided Architectural Design- to sustain the efforts of specialists involved in the preservation of historic buildings and monuments. The preservation of the historic and artistic patrimony is nowadays a prior interest at international level. CAAD provides a rich set of different tools and methods with which historians, architects and engineers can analyze, develop and test their interventions on the monument, discuss the consequences of their actions and visualize the effects, enhancing different aspects. Computer-based reconstruction and visualization of the monument of interest can yield important insights before any modification has taken place. Taking advantage of the possibilities offered by the world wide web (www, experts can discuss their results with other experts with textual descriptions, pictorial information as well as complete computer models of varying level of abstraction. Based on the reconstruction proposal of an existing monument, we will discuss different aspects of the tools mentioned herein. We will present a tool (Sculptor, with which we reconstructed various typological models of the monument. Based on this analysis we modeled the modified monument with commercial CAD programs.

    En este artículo se presentan distintas posibilidades del CAAD -Diseño Arquitectónico Asistido por Ordenador- como apoyo a los especialistas involucrados en la conservación de edificios histórico-monumentales. La conservación del patrimonio histórico-artístico es, hoy en día, tema de interés prioritario a nivel internacional. El CAAD ofrece un rico conjunto de herramientas y métodos mediante los cuales historiadores, arquitectos e ingenieros pueden analizar, a la vez que experimentar, las distintas propuestas de intervención sobre un monumento y visualizar sus posibles consecuencias. La reconstrucción asistida por computador y la simulación del monumento

  3. El confort y la seguridad en los edificios

    Directory of Open Access Journals (Sweden)

    Lea, Frederick

    1967-06-01

    Full Text Available The Building Research Establishment was set up in Britain in 1931. Its purpose is to apply to building those aspects of scientific knowledge that favour an evolution towards more rational shapes and procedures. Its activities are as wide as its field of interest equires. One of its main missions is to investigate how each type of material in a building behaves, so that the material can be used in the most economical manner. To integrate cheapness and saving in time, new prefabricating methods, both at the workshop and at the site, are studied. The activities of the Establishment also include themes that do not seem to have an immediate economic purpose, but which are not valueless, since they refer to an increase in the comfort of buildings. Finally, this Establishment helps underdeveloped countries in the choice of constructive forms that are best adapted to local economic and climate conditions. The Establishment has adequate means, both human and material, to fulfill its task efficiently.El establecimiento de Investigaciones sobre la Construcción se creó en Gran Bretaña en el año 1921. Su objeto es aplicar a la construcción aquellos conocimientos científicos que permitan una evolución hacia formas y procedimientos más racionales. Sus actividades son tan amplias como requiere su campo de actuación; una de sus principales misiones es determinar la forma de trabajo de cada uno de los materiales que componen la obra, permitiendo el máximo aprovechamiento con la consiguiente ventaja económica. Para compaginar economía y rapidez se estudian nuevos procedimientos de prefabricación, tanto en fábrica como en la propia obra. Su campo de investigación también abarca temas que no tienen una evolución económica aparente, pero que no son despreciables, ya que atienden a un mayor confort en las construcciones. Finalmente, este centro ayuda a países subdesarrollados en la elección de formas constructivas adaptadas a sus necesidades econ

  4. Simulación de Redes de Sensores Inalámbricos: un Modelo Energético a Nivel de Nodo-Sensor Bajo las Especificaciones Ieee 802.15.4tm y Zigbee

    Directory of Open Access Journals (Sweden)

    Milton Osvaldo Amarillo Rojas

    2015-10-01

    Full Text Available Este artículo presenta el desarrollo de un modelo de simulación para una red de sensores inalámbricos que se rige por las especificaciones IEEE 802.15.4 y ZigBee y que utiliza la configuración de la beacon habilitada. El modelo de simulación también implementa un modelo de consumo de energía para los tres tipos de nodossensores de la red (Coordinador ZigBee, Router y Dispositivo Final. El principal aporte de este trabajo radica en que por medio de la simulación se puede estimar el consumo de energía de un nodo-sensor y, de esta forma, analizar el consumo de energía de cada uno de los tipos del mismo. Así mismo, al poder estimar el consumo de energía del nodo-sensor, también se puede estimar su tiempo de vida. Por último, se analiza la razón, por la cual, el consumo de energía de los nodos es inversamente proporcional a la latencia de los datos dentro de la red.

  5. Maison de verre / Zonestraal. Relato de dos edificios

    Directory of Open Access Journals (Sweden)

    Jan Molema

    2014-01-01

    Full Text Available Desde los años sesenta del siglo XX el sanatorio Zonnestraal de Hilversum y la Maison de Verre en París han sido descritos extensamente en la literatura de la arquitectura moderna. Sin embargo, no se ha hecho ningún esfuerzo por colocarlos juntos en un mismo relato. Este ensayo es un esfuerzo para enmendar ese vacío. Ambos están relacionados íntimamente por sus autores: Bernard Bijvoet, como codiseñador de los planos de la Maison, y Johannes Duiker, quien trabajó con el anterior en los preliminares de Zonnestraal, aunque lo finalizó en solitario, al mismo tiempo que se terminó el diseño de la casa. En el trabajo se cuestiona además, ofreciendo fundadas conjeturas, la creencia establecida de que se precisó una nueva estructura metálica para sustentar la inalterada vivienda situada encima de la Maison de Verre.

  6. Evaluación de la demanda energética de edificios no residenciales en Escocia = Energy demand benchmarking of non-domestic buildings in Scotland

    Directory of Open Access Journals (Sweden)

    Julien Chetboula

    2015-12-01

    Los parámetros decisivos fueron la intensidad de uso de la energía (kWh/m2 y el uso y la edad de los edificios. Esto permitió la creación de seis tipos de edificios, aunque siguiendo patrones de ocupación se dividió en cuatro categorías desde el s. XVI hasta el s. XXI. Los principales resultados revelan el predominio de un clúster de edificios educativos en términos de superficie (72%, el número de edificios (70%, las emisiones de carbono (68% de los cerca de 42.000 toneladas de CO2 y el consumo de energía (61% de la 38,4 MWh de electricidad consumida, y el 73% del 117,4 MWh de gas natural que se consume. Entre estos niveles de consumo destacan el potencial de ahorro de energía para las escuelas: 186 kWh / m2 / año en promedio, en comparación con la media europea de 100 kWh / m2 / año de energía térmica de uso final. Abstract Over the years building energy performance has become a predominant concern for owners and real estate managers. The focus is usually on residential buildings but in the last twenty years an interest in non-domestic buildings has emerged in the UK. Benchmarks can generally be found at UK scale, although often restricted to England and Wales. This paper aims to provide benchmarks for the Scottish non-domestic building stock as part of the City of Edinburgh Council estate. In this research, the selected sample includes energy data and calculated carbon emissions of 199 buildings. The deciding parameters were the energy use intensity (kWh/m2 and the use and age of buildings. The last two allowed the creation of six clusters in which to group buildings of similar occupancy patterns in four age categories from the 16th to the 21st century. The main findings reveal the predominance of an educational buildings cluster in terms of floor area (72%, number of buildings (70%, carbon emissions (68% of about 42,000 tons of CO2, and energy consumption (61% of the 38.4 MWh of electricity consumed, and 73% of the 117.4 MWh of natural gas

  7. Aeropuerto Heathrow - Londres (Inglaterra: Nuevo edificio de aduanas

    Directory of Open Access Journals (Sweden)

    Manning y Clamp, Arquitectos

    1970-10-01

    Full Text Available This building is designed on a square modulus of 1.524 m side, and it is 61 m long and 36.58 m wide On the ground floor there is a main hall, the Queen's Stores, the central files for documents and offices, and various heating and other services. On the first floor is the Long Room, surrounded by the Receiver's offices, and those of the other administrative staff. There are also kitchens, washing rooms, a self-service canteen with capacity for 50 people, and a hall. As it is close to the main airport runways, the building is protected by double glazing, and its provided with mechanical ventilation.Diseñado según un módulo cuadrado de 1,524 m de lado, mide 60,96 m de longitud por 36,58 m de anchura. La planta baja alberga: el vestíbulo principal de entrada al público, el «almacén de la reina», el archivo central de documentos y oficinas anejas, cuartos de la calefacción, etc. La dependencia principal de la primera planta es la «Long Room», que está rodeada por las oficinas del recaudador y del personal administrativo, aseos, cocinas, etc., una cantina —autoservicio para 50 personas— y un salón. Por estar situado a poca distancia de la pista principal de despegue y para reducir el ruido de los reactores, se ha dotado de ventilación mecánica con doble acristalamiento en los cerramientos.

  8. Strategies to optimize the electric energy use in non-residential buildings; Estrategias para eficientizar el uso de la energia electrica en edificios no residenciales

    Energy Technology Data Exchange (ETDEWEB)

    Castro Flores, J.; Morillon Galvez, D. [Comision Nacional para el Ahorro de Energia, Mexico, D. F. (Mexico)

    1995-12-31

    This paper presents the problems identified in non-residential buildings, where the inadequate use of energy is mainly shown in three points: inadequate technology and maintenance, wrong use and wrong habits in the energy use. The consequences of this situation in the ecological, politic and social environment were analyzed. In base of the problems detected the following strategies are proposed: An adequate project and design, retrofit, maintenance and users awareness for the rational energy use. The economic evaluation performed for the implementation of these strategies shows a significant saving potential of the electric power, with measures of null and low investment. [Espanol] Se presenta la problematica identificada en edificios no residenciales; donde el uso inadecuado de la energia electrica se manifiesta principalmente en tres puntos: tecnologia y mantenimiento inadecuados, y mal uso y costumbres de la energia. Se analizo las consecuencias de esta situacion en el ambito ecologico, economico, politico y social. Con base a la problematica se proponen las siguientes estrategias: un adecuado proyecto y diseno, retrofit, mantenimiento y concientizacion del usuario para el uso racional de la energia. La evaluacion economica realizada para implantar estas estrategias muestra un significativo potencial de ahorro de energia electrica, con medidas de nula y baja inversion.

  9. Strategies to optimize the electric energy use in non-residential buildings; Estrategias para eficientizar el uso de la energia electrica en edificios no residenciales

    Energy Technology Data Exchange (ETDEWEB)

    Castro Flores, J; Morillon Galvez, D [Comision Nacional para el Ahorro de Energia, Mexico, D. F. (Mexico)

    1996-12-31

    This paper presents the problems identified in non-residential buildings, where the inadequate use of energy is mainly shown in three points: inadequate technology and maintenance, wrong use and wrong habits in the energy use. The consequences of this situation in the ecological, politic and social environment were analyzed. In base of the problems detected the following strategies are proposed: An adequate project and design, retrofit, maintenance and users awareness for the rational energy use. The economic evaluation performed for the implementation of these strategies shows a significant saving potential of the electric power, with measures of null and low investment. [Espanol] Se presenta la problematica identificada en edificios no residenciales; donde el uso inadecuado de la energia electrica se manifiesta principalmente en tres puntos: tecnologia y mantenimiento inadecuados, y mal uso y costumbres de la energia. Se analizo las consecuencias de esta situacion en el ambito ecologico, economico, politico y social. Con base a la problematica se proponen las siguientes estrategias: un adecuado proyecto y diseno, retrofit, mantenimiento y concientizacion del usuario para el uso racional de la energia. La evaluacion economica realizada para implantar estas estrategias muestra un significativo potencial de ahorro de energia electrica, con medidas de nula y baja inversion.

  10. Modelo de diseño de nodos de integración en las cadenas de suministro/Design model of integration nodes in the supply chains

    Directory of Open Access Journals (Sweden)

    Yinef Pardillo-Baez

    2013-01-01

    Full Text Available La débil integración entre empresas de las cadenas de suministro, el hecho de que las entidadesno tienen un procedimiento para identificar los parámetros e indicadores de coordinación entreprocesos, la ineficiente gestión integrada de recursos y capacidades y el inadecuado uso de loscontratos como herramienta de coordinación entre los actores de la cadena de suministro; sonelementos que caracterizan la práctica empresarial de las cadenas de suministro cubanas. Elsiguiente trabajo plantea las bases del Modelo de Diseño de los Nodos de Integración en lascadenas de suministro, y sus aplicaciones. El Modelo es una herramienta de diseño, a la vez queapoya la toma de decisiones en los procesos. Se demuestra que al aplicar el modelo y suprocedimiento, la cadena obtiene mejores resultados e incrementa su integración. Comoconclusión fundamental se obtiene que el Modelo es aplicable y brinda resultados positivos para lapráctica empresarial cubana.

  11. Nodo-colonic fistula caused by intra-abdominal tuberculous lymphadenitis during treatment with anti-tuberculous medication: A case report

    Energy Technology Data Exchange (ETDEWEB)

    Nam, Kyung Sun; Bae, Kyung Eun; Jeong, Myeong Ja; Lee, Ji Hae; Kang, Mi Jin; Kim, Jae Hyung; Kim, Soo Hyun [Dept. of Radiology, Sanggye Paik Hospital, Inje University College of Medicine, Seoul (Korea, Republic of)

    2016-08-15

    Recently, the overall incidence of tuberculosis has decreased, but the incidence of an extrapulmonary manifestation in patients with tuberculosis has increased in the Republic of Korea. Although intestinal tuberculosis is not infrequent, a fistula caused by tuberculosis is a rare condition. A 23-year-old man presented with fever, diarrhea and right lower quadrant pain. A computed tomography (CT) scan revealed a lobulated, peripherally enhancing, low density mass in the mesentery. The patient underwent laparoscopic biopsy for necrotic lymph node, and intra-abdominal tuberculous lymphadenitis was diagnosed. Four months after initiating treatment with anti-tuberculous medication, the patient developed fever together with lower abdominal pain. A follow-up CT scan revealed a fistulous tract that had developed between the initially noted lymphadenopathy and the proximal ascending colon. Laparoscopic right hemicolectomy was performed as a curative treatment. This case suggests that a nodo-colonic fistula may occur as a paradoxical response in patients with intra-abdominal tuberculous lymphadenitis during treatment with anti-tuberculous medication.

  12. Edificio propiedad de la «Home Insurance»

    Directory of Open Access Journals (Sweden)

    Wimberly & Cook, Arquitectos

    1963-10-01

    Full Text Available On a 5,564 m2 site, in Honolulu, this buildings has an actual ground area of 4,645 m2. It has five storeys. The first three floors and part of the fourth floor —which contains the cafeteria and lecture room— are occupied by the offices and other installations of the «Home Insurance» in Hawaii. The remaining space is let out. The project has also parking space for 100 cars. The design of the general layout has been planned thinking of possible extensions and adaptations to new functional requirements. Aluminium Venetian blinds have been fitted, and these have proved to be a successful protection against intense sunlight, since they prevent the light to shine directly on the office desks, they reduce lateral luminosity, and insure a satisfactory level of illumination. The entrance hall has a fine mural, designed by Gerald Allison and made by Hawaii Ceramics.Ha sido construido en Honolulú, sobre un solar de 5.564 ms2, de los que la edificación ocupa una superficie de 4.645 metros cuadrados. Consta de cinco plantas: la planta baja, primera, segunda y parte de la cuarta—en la que se distribuyen la cafetería y la sala de conferencias—, las utiliza para sus oficinas y dependencias principales, en Hawai, la «Home Insurance»; la tercera y resto de la cuarta se destinan a alquiler. Dispone también de un gran aparcamiento con capacidad para 100 coches. Todas sus instalaciones han sido proyectadas, previendo la fácil realización de futuras ampliaciones y adaptaciones a nuevas necesidades. La celosía de aluminio ha demostrado ser buena solución para la protección contra el sol, pues impide que los rayos solares incidan directamente sobre las mesas de trabajo, reduce el brillo lateral, y asegura una buena visibilidad. Como aportación de las Artes Plásticas existe un mural en el vestíbulo de entrada, diseñado por Gerald Allison y realizado por Cerámicas Hawai.

  13. Control inteligente de sistemas e iluminación en edificios

    OpenAIRE

    Huamán Rojas, Jezzy James

    2017-01-01

    La tesis desarrolla un controlador adaptativo para el control inteligente de la iluminación en cualquier ambiente, esto considera edificios, casas, oficinas, entre otros. Se presentan dos opciones de controlador y, para considerarlo un sistema inteligente, este se adapta al usuario haciendo uso de la tecnología de aprendizaje automático y regulable. Redes neuronales artificiales y árboles de decisión se emplean para adecuar la iluminación sin dejar de cumplir las normas que se establecen por ...

  14. Predicción de demanda eléctrica en edificios

    OpenAIRE

    Ollé López, Guillem

    2015-01-01

    La finalidad del presente proyecto consiste en exponer una serie de herramientas basadas en nuevas tecnologías computacionales para la predicción de la demanda eléctrico en edificios. Estas nuevas tecnologías computacionales se denominan redes neuronales artificiales y se basan en algoritmos muy potentes para relacionar grandes cantidades de información y, de esta manera construir modelos matemáticos muy complejos que puedan, en este caso, predecir valores. Para poder tene...

  15. En edificios de ayer, funciones de hoy. La vivienda: una constante histórica

    Directory of Open Access Journals (Sweden)

    Felipe Gallardo Gastelo

    2002-01-01

    Full Text Available La época contemporánea nos obliga a aprovechar el espacio urbano lo mejor posible. Es necesario evitar el crecimiento en extensión. Vale la pena, en cambio, utilizar en plenitud los edificios subutilizados. O inutilizados. El reciclaje de antiguas estructuras para inyectarles una función nueva es una opción legítima y conveniente. En la mayor parte de los casos, la vivienda –como origen o como destino– es el motivo central de las intervenciones arquitectónicas.

  16. Edificio de viviendas (1879) : Calle de la Paz, 13, Valencia : proyecto de interiorismo

    OpenAIRE

    GARZÓN CHAMBA, LIZETTE ANDREA

    2014-01-01

    Este TFG se centra en estudiar el edificio número 13 de la Calle de la Paz, del arquitecto Antonio Martorell y Trilles datado en 1879. El objetivo es la aplicación de criterios y conocimientos de intervención en un espacio físico preexistente del patrimonio arquitectónico, combinando técnicas y procedimientos gráficos avanzados. Se utiliza una metodología BIM (Building Information Modeling), orientado al estudio, análisis y propuesta de transformación, habilitación o cambio de uso. Se preten...

  17. Seguimiento de obra de un edificio industrial entre medianeras en Barcelona

    OpenAIRE

    Toro Galván, Jaime

    2012-01-01

    Estas líneas sirven para resumir lo que en páginas posteriores será el desarrollo completo del proyecto final de carrera. Como indica el título “Seguimiento de obra de un edificio industrial entre medianeras en Barcelona” el objetivo es reflejar los procesos de ejecución, control de costes, planificación y control de calidad, así como los diferentes procesos necesarios para el control de una obra. En una primera parte, veremos de forma general la metodología de control y seguimien...

  18. Edificio de ocio y espectáculos. Plaza de toros en Móstoles, Madrid/España

    Directory of Open Access Journals (Sweden)

    Casado, J.

    1997-02-01

    que suele recurrirse a montajes temporales. Este edificio plantea una solución a este problema, integrando en un mismo espacio, deforma estable, dos funciones de ocio distintas, la taurina y la teatral. Se sopesan los condicionantes derivados de cada una de ellas para obtener un resultado final capaz de conjugar la centralidad del coso con la frontalidad del auditorio. El escenario, como elemento característico de la nueva función, busca su ubicación en un lugar visible y asequible como lo es una localidad más del tradicional graderío. Las localidades que ahora ocupa se trasladan al punto diametralmente opuesto, conservando siempre la continuidad circular, fundamental para el desarrollo del espectáculo taurino. Así, el graderío se desplaza para dar entrada al nuevo elemento, la escena, que usurpa su tradicional sentido horizontal. Todo esto utilizando una arquitectura propia -y por lo tanto contemporánea- que propone una vía de evolución para el futuro desarrollo de nuestros cosos taurinos.

  19. Estudio técnico económico de alternativas del proceso de cimbrado y descimbrado en la construcción de un edificio de forjados de losa maciza de hormigón armado

    Directory of Open Access Journals (Sweden)

    Yezid Alvarado

    Full Text Available El objetivo del presente trabajo es definir diferentes alternativas de procesos constructivos, estimando cuáles resultan ser las más beneficiosas respecto a su plazo de ejecución y su coste, para un edificio de forjados de losa maciza de hormigón armado. Para resolver los plazos de ejecución se plantearon tres alternativas del proceso constructivo: Cimbrado y Descimbrado; Cimbrado, Clareado y Descimbrado; y Cimbrado, Recimbrado y Descimbrado, considerado 2, 3 y 4 plantas consecutivas apuntaladas. Para evaluar qué procesos son válidos, primero se calculan las cargas que se presentan durante el proceso constructivo mediante el Nuevo Procedimiento Simplificado y posteriormente se comprueba si se cumple o no, en cada una de las operaciones constructivas, la condición de descimbrado. Para el edificio objeto de estudio se han obtenido como procesos viables económica y técnicamente los procesos constructivos de Cimbrado, Clareado y Descimbrado con 3 y 4 plantas cimbradas.

  20. Prácticas en empresa de rehabilitación, restauración y mantenimiento de edificios

    OpenAIRE

    Muelas Moreno, Marcos

    2012-01-01

    Después de haber realizado siete meses de prácticas como encargado de obra en 4ARK, una constructora de rehabilitación de edificios de Barcelona, he querido recoger en este trabajo las patologías más frecuentes que nos encontramos cuando rehabilitamos un edificio o alguna parte del mismo (cubiertas, fachadas, estructura y bajantes). También se ha analizado que trabajos son los que se suele tener problemas y causan retrasos, ocasionando la suma de todos ellos, el no cumplimiento...

  1. Domogis: prototipo de un interfaz del sistema de control de un edificio integrado en un SIG

    Directory of Open Access Journals (Sweden)

    Álvarez, M.

    2010-06-01

    Full Text Available This paper deals with of a the use of Geographical Information Systems (GIS for domotic control. The foccus is put on the communication interface between the building control system (BCS integrated in a GIS. For get this aim, the GIS of the Montegancedo Campus where is located the Facultad de infomatica of UPM and the creation of an interface is needed. The implemented interface in Microsoft C# language allows the control, monotorizing and management of the sensors data installated in the Campus.

    Este trabajo trata de la utilización de los Sistemas de Información Geográfica (SIG en uno de las nuevos requerimientos de la arquitectura, el control domótico. El objetivo es el desarrollo de un interfaz de comunicación del Sistema de Control de un Edificio (SCE integrado en un SIG. La consecución de este objetivo implica previamente el desarrollo del SIG del Campus de Montegancedo sede de la Facultad de Informática de la UPM y la creación de un interfaz integrado en el SIG, desarrollado en lenguaje de programacion C# de Microsoft. Este interfaz dirige al usuario en la realización de ciertas tareas de control domótico de las instalaciones urbanas y edificios del Campus universitario, como evaluar, monotorizar y gestionar datos procedentes de sensores estratégicamente situados en dicho Campus.

  2. La Casa dell’abate a San Giovanni in Persiceto: Indagini conoscitive e questioni operative per la conservazione di un «edificio-fossile»

    Directory of Open Access Journals (Sweden)

    Squassina, Angela Paola

    2008-12-01

    processo di trasformazione per sostituzione graduale degli elementi lignei con muratura, che lo ha condotto da una condizione di edificio-fondaco a carattere non residenziale, verso un assetto prevalentemente abitativo. A ciò si aggiunge una generale condizione di ridotta leggibilità stratigrafica, dovuta ad un intervento risalente agli anni Sessanta, che ha comportato profonde trasformazioni strutturali ed una generale alterazione delle superfici esterne sistematicamente rinnovate, con conseguente modifica della percezione di antichità dell’insieme. Una condizione che suggerisce alcune riflessioni sul rapporto fra leggibilità stratigrafica e conservazione dell’autenticità. In un edificio fortemente alterato, viene drasticamente ridotta la capacità risolutiva dello strumento stratigrafico, di cui diventa necessario ricalibrare codici e modalità applicative. Tuttavia, da questa necessità di continuo adattamento a diverse condizioni di lettura, risulta un’articolazione della stratigrafia – qualora inclusa organicamente nella concezione del progetto di restauro – e la leggibilità stratigrafica può divenire anche prezioso indicatore delle alterazioni indotte e criterio tecnico-culturale di orientamento del progetto, come tensione ideale verso il controllo delle trasformazioni nell’intervento. Che si configura qui in termini minimali e rispettosi delle testimonianze superstiti frammentate e della loro leggibilità stratigrafica.

  3. Edificio residencial «El Edén» en el Soto de la Moraleja, Madrid, España

    Directory of Open Access Journals (Sweden)

    de Haro Piñar, Juan

    1979-04-01

    Full Text Available This article describes the thorough and minute conception of a multi-family building, where the presiding idea of achieving the feeling of individual separated homes has been created by the treatment of exteriors —landscaping, terraces, etc.— by the privacy- oriented layout of each housing unit and by the provision of services adequate to the high class and quality desired in this project. The carpark is collective —three carstalls to every unit— the servants quarters are arranged in independent bungalows, and the complex is provided with an ample garden, swimming pools and concierge accomodations. The materials used both in interiors and exteriors are conventional but of high quality, deserving mention the gracious variable planes designed in plan and elevation, and the chromatic reververation of roofing tiles, all of which confer this complex a unique, original and clearly distinctive personality.

    Se describe en este artículo la concepción extraordinariamente cuidada de un edificio multifamiliar con la idea fundamental de lograr una sensación de viviendas aisladas, tanto en el tratamiento exterior —jardinería, terrazas, etc.—, como en la privacidad de cada unidad residencial, con 400 m2 construidos, y distribución y servicios adecuados a la categoría de gran nobleza prevista en el proyecto. Hay un aparcamiento colectivo —con tres plazas por vivienda—, unos bungalows independientes para el servicio, amplio jardín circundante, piscinas y vivienda del portero. Los materiales utilizados en el interior y exterior son tradicionales y de gran calidad, destacando la graciosa movilidad de plantas y alzados y la vibración cromática de las tejas de la cubierta, todo lo cual confiere al complejo una fisonomía característica, original y francamente distintiva.

  4. Non-invasive neutron diffraction analysis of marbles from the 'Edificio con Tre Esedre' in Villa Adriana

    International Nuclear Information System (INIS)

    Filabozzi, A.; Andreani, C.; Pietropaolo, A.; De Pascale, M.P.; Gorini, G.; Kockelmann, W.; Chapon, L.C.

    2006-01-01

    Roman marble fragments from the Villa Adriana at Tivoli (Rome) have been characterised by neutron diffraction. This study aimed at distinguishing between different marble types on the basis of the mineral phase compositions and the crystallographic textures. It is demonstrated that on a multi-detector time-offlight neutron diffractometer a quantitative bulk texture analysis can be performed on a stationary marble sample in a matter of minutes. This potentially allows investigating large sample series or bulky, intact marble objects in a completely nondestructive manner. The texture information, along with other structure details, can be used as characterising feature to address questions of attribution and restoration of archaeological marble objects

  5. Análisis de ciclo de vida de una nueva solución arquitectónica que mejora el rendimiento térmico de la envolvente del edificio: Fachada Natural Aljibe

    OpenAIRE

    Carabaño, R.; Bedoya, C.; Ruiz, D.

    2014-01-01

    El objetivo de este trabajo, que supone la mejora del rendimiento térmico de la envolvente del edificio, es dar a conocer los impactos ambientales asociados a una nueva solución de fachada vegetada mediante la metodología de Análisis de Ciclo de Vida con límites del sistema de la cuna a la tumba. El análisis pretende también generar información relevante de ciclo de vida como material de partida para la redacción de una futura Declaración Ambiental de Producto. La etapa de fabricación de los ...

  6. Transformaciones urbanas y reivindicaciones ambientales: En torno a la productividad social del conflicto por la construcción de edificios en la Ciudad de Buenos Aires

    Directory of Open Access Journals (Sweden)

    Antonio Azuela

    2013-09-01

    Full Text Available En diversas ciudades latinoamericanas la expansión metropolitana es paralela a la densificación de la ciudad central, expresada en la proliferación de desarrollos inmobiliarios que modifican la ciudad construida. Los residentes de esas zonas despliegan acciones de protesta al percibir un deterioro en su entorno. Surgen entonces "conflictos de proximidad" que es relevante analizar, recuperando una de las orientaciones centrales de la sociología del conflicto, que es la de indagar acerca de su productividad social en tres dimensiones: la territorialización, la irrupción del conflicto en el espacio público y la actualización local del derecho. Se pretende contribuir a la comprensión de los recientes conflictos urbanos desde esta perspectiva, mediante el análisis del conflicto que surgió por la construcción de nuevos edificios en la Ciudad de Buenos Aires, poniéndolo en diálogo con un caso de la Ciudad de México, donde han surgido conflictos similares.

  7. Documentación gráfica de edificios históricos: principios, aplicaciones y perspectivas

    Directory of Open Access Journals (Sweden)

    Martín Talaverano, Rafael

    2014-12-01

    Full Text Available The graphic survey of historical buildings is one of the most powerful tools to preserve its material cultural values and it is besides the basis for its research, conservation and dissemination. Although manual drawing has been historically the main representation technique, some other methods have been recently developed to improve the data capture and its later management. This article aims to show clearly the basic concepts related to the making process of the graphic documentation in order to make possible to select reasonably and effectively such techniques. For this purpose, a comparative analysis of the current methods is firstly shown, followed by several case studies and those criteria taken into consideration within them. Finally, the main ideas obtained in the previous analysis are presented, as well as the future prospect that in our opinion set new development ways in this field.La documentación gráfica de edificios históricos constituye una de las herramientas más potentes para la preservación de sus valores culturales materiales y es la base para su investigación, conservación y difusión. Si bien históricamente el dibujo manual ha sido la principal técnica de representación, recientemente se han desarrollado otras para mejorar la toma de datos y su posterior gestión. Este artículo tiene como objetivo mostrar de un modo claro y sencillo los principales conceptos vinculados a la elaboración de la documentación gráfica, para facilitar la selección de las técnicas de un modo razonable y eficaz. Para ello se exponen y comparan los distintos métodos actuales, ofreciendo además varios casos de estudio con los criterios considerados en cada uno de ellos. Como conclusión se describen las ideas fundamentales derivadas de este análisis, así como las perspectivas de futuro que a nuestro juicio abren vías de desarrollo en este campo.

  8. Análisis del comportamiento sísmico de los edificios de obra de fábrica, típicos del distrito Eixample de Barcelona

    Directory of Open Access Journals (Sweden)

    Moreno-González, R.

    2011-12-01

    Full Text Available In this work a study about the vulnerability and seismic risk of the unreinforced masonry buildings, widely, existent in the Eixample district of Barcelona, Spain, is carried out. The buildings, here, analyzed are real and detailed structural drawings and reports have been used to model them. The seismic risk is evaluated by means of a mechanical model, based in the Capacity Spectrum Method. The seismic demand is described by elastic response spectrum defined by the Eurocode-8. Fragility curves are obtained from a nonlinear analysis, considering the capacity spectra. Expected seismic damage is gotten with the damage probability matrices. The analysis of the buildings has been performed by TreMuri program by means of a macro-element model. The results shown a considerable vulnerability in this type of buildings, therefore, in spite of the seismic hazard, the expected seismic risk is significant.

    En este trabajo se realiza un estudio para evaluar la vulnerabilidad y el riesgo sísmico de los edificios de obra de fábrica de ladrillo ampliamente existentes en el distrito Eixample de Barcelona, España. Los edificios analizados son reales y se dispone de planos e informes específicos. El análisis del riesgo sísmico se lleva a cabo mediante un método mecánico basado en el Método del Espectro de Capacidad. La demanda sísmica se define a partir del espectro elástico de respuesta definido por el Eurocódigo-8. Las curvas de fragilidad se obtienen a partir de un análisis no lineal, teniendo en cuenta los espectros de capacidad. El dano sísmico esperado se consigue con las matrices de probabilidad de daño. La modelización de los edificios se realiza con el programa TreMuri mediante un modelo de macroelementos. Los resultados obtenidos muestran una vulnerabilidad importante, teniendo en cuenta el escenario sísmico considerado, el riesgo sísmico esperado es alto.

  9. Mantenimiento y conservación de edificios: agentes que intervienen en la gestión y explotación del parque inmobiliario

    Directory of Open Access Journals (Sweden)

    García Navarro, Justo

    1995-12-01

    Full Text Available During the last two decades, and specially at the end of the eighties and the beginning of the nineties, the professional specialization in building maintenance, and also the concept of "Integral Maintenance", were both developed in Spain. There are not many new contributions in this field. In most cases, techniques and ideas implanted and used in countries with higher real estate culture and tradition were imported. This paper is based on the conclusions of a conference celebrated last year in the "Fundación Cultural COAM" of the Architects Association of Madrid, and it was included in a Course of Specialization in Building Maintenance. Different agents involved in building management were discussed as well as the basis of the "Integral Maintenance" It would be necessary to say that the structural, finishing materials and facilities aspects have not deep analyzed, because of they were separately studied in other conferences of the mentioned Course.

    Durante las dos últimas décadas y especialmente en los últimos años ochenta y primeros de los noventa, la especialización profesional en el campo del mantenimiento y conservación de los edificios, así como la implantación del concepto de "mantenimiento integral " del inmueble, se han desarrollado en España de una manera clara y progresiva. No se han realizado muchas aportaciones originales, sino que en la mayoría de los casos se han extrapolado técnicas y planteamientos ya contrastados en otros países con una mayor cultura y tradición inmobiliarias. Este artículo -que surge como conclusiones de una conferencia impartida en el Curso de Especialización en Mantenimiento y Conservación de Edificios, celebrado por la Fundación Cultural COAM del Colegio Oficial de Arquitectos de Madrid el pasado año-, se abordan distintos agentes que intervienen en la gestión y explotación de un inmueble, y su tratamiento de manera conjunta, como base del "mantenimiento integral”. Conviene

  10. Control activo de vibraciones en estructuras tipo edificio sometidas a sismos utilizando múltiple retroalimentación positiva de la posición y modos deslizantes

    Directory of Open Access Journals (Sweden)

    Josué Enríquez-Zárate

    2014-01-01

    Full Text Available Este trabajo considera el análisis estructural y dinámico de un a estructura tipo edificio de tres pisos con un absorbedor de v ibraciones pasivo/activo. La base de la estructura se perturba con un gene rador de vibraciones, proporcionando fuerzas de excitación y ru ido emulando transporte terrestre, trenes subterráneos y sismos, c omunes en la Ciudad de México. Se considera un registro sísmico real de magnitud 8.1Mw, conteniendo algunas frecuencias resonantes de l a estructura. La estructura mecánica se modela con la metodolog ía de Euler-Lagrange y se valida con técnicas de análisis modal exper imental. El esquema de control activo se diseña para atenuar la respuesta vibratoria del sistema, ocasionada por las fuerzas armónicas qu e actúan en la base, empleando múltiple retroalimentación posit iva de la posición y control por modos deslizantes para mejorar la robust ez del sistema en lazo cerrado y atenuar tres modos de vibració n. Resultados en simulación y experimentales describen el desempeñ o del sistema completo.

  11. Propuesta intervención energética en un edificio plurifamiliar

    OpenAIRE

    López Burdeus, Paula

    2013-01-01

    Treball final de Grau corresponent a la titulació d'Arquitectura Tècnica. Curs 2012/2013 Uno de los aspectos fundamentales en un edificio residencial es el confort térmico, se considera cada vez más relevante minimizar las pérdidas térmicas a través de la envolvente de las edificaciones y de sus instalaciones, garantizando un mínimo de confort. Cabe destacar también que la existencia de pérdidas térmicas suponen el derroche de energía. Es por ello que cuando se habla de rehabilitación s...

  12. Edificio de servicios múltiples Valladolid/España

    Directory of Open Access Journals (Sweden)

    Méndez, Eduardo

    1983-05-01

    Full Text Available From the modules of the Coordinating Committee of administrative buildings, established in accord with requirements of space of the different jobs, this building has been constructed to globalize the numerous dependencies of various Ministries and Institutes. In essence, the construction is composed of two cellar levels for parking and services; a lower floor for the cafeteria and meeting hall; two upper floors for offices, connected with the nucleous of vertical communications. For the structure, as likewise for the dimensioning of the jobs and the windows and even the paving of the false ceiling, the basic module was 1.25 x 1.25 metresA partir de los módulos de la Junta Coordinadora de edificios administrativos, establecidos en función de las necesidades de espacio de los distintos puestos de trabaja se ha realizado este edificio que engloba las numerosas dependencias de varios Ministerios e Institutos. En esencia la construcción se compone de dos niveles de sótano para aparcamiento y servicios; una planta baja destinada a cafetería y salón de actos; dos cuerpos elevados, destinados a oficinas, enlazados por el núcleo de comunicaciones verticales. Para la estructura, así como para el dimensionamiento de los puestos de trabajo y de los huecos de ventana, e inclusa del despiece del pavimento y del falso techo, se ha partido de un módulo base de 1,25 X 1,25 metros.

  13. Estudio para la optimización de mallas estructurales de acero envolventes de edificios en altura según sus solicitaciones, en base al análisis de sus líneas isostáticas

    Directory of Open Access Journals (Sweden)

    Señís, R.

    2014-12-01

    Full Text Available The aim of the present study is determinate if the steel space grid envelope structures, for tall buildings (framed tube, are more optimal and efficient if their design is based on the isostatic lines of their equivalents structural elements according to their solicitations. In this study, 600 models of tall buildings, for different triangled façades and geometric slenderness, are analyzed. The methodology employed consisted of detecting the wind loads that affects tall buildings applying the Equivalent Static Wind Loads (ESWL in relation to the wind speed and turbulence result of the roughness terrain and the topographic. However, it was also needed to establish the frequencies and modes of vibration of each structure as well as defining the coefficients of pressure, force and moments produced by the wind. The results conclude that space grids are more efficient if they do adopt the trajectory of the main and dominant load, in this case the wind.El objetivo del presente estudio es determinar si las mallas estructurales de acero, envolventes de edificios en altura (entramado en tubo, son más óptimas y eficientes cuando su diseño se adapta a la trayectoria de las líneas isostáticas de los elementos estructurales equivalentes bajo las acciones solicitantes. Se analizan 600 modelos de edificios en altura, para distintas triangulaciones de fachada y esbelteces. Las cargas de viento que influyen sobre los edificios se determinan con el método de Cargas Estáticas Equivalentes de acuerdo a la velocidad del viento y turbulencia provocados por la rugosidad del terreno y la topografía. También será necesario determinar las frecuencias y modos de vibración propios de cada estructura, así como definir los coeficientes de presión, de fuerzas y de momentos resultantes del viento. Los resultados concluyen que las mallas ganan eficiencia cuando identifican la trayectoria de las líneas isostáticas generadas por la acción principal, el viento.

  14. Vulnerabilidad y riesgo sísmico de los edificios residenciales estudiados dentro del Plan Especial de evaluación del riesgo sísmico en la Comunidad Valenciana

    Directory of Open Access Journals (Sweden)

    Serrano-Lanzarote, B.

    2015-09-01

    Full Text Available This paper presents a study about the seismic vulnerability of residential buildings in the Valencian region, as part of the Special Plan for the seismic risk. The regional government has the obligation to develop these type of plans in areas with seismic intensities higher than VII degrees, accord to the European Macroseismic Scale. The methodology used to identify the constructive characteristics in the region, age of buildings, to assign seismic vulnerability classes, to estimate potential damage caused by a probable earthquake and mapping the risk arising, is presented. We highlighted the estimation of an average high damage of 13 % of the number of buildings in the Alicante region, decreasing in Valencia and Castellon to 8 % and 0.2 %, respectively. To manage data a geodatabase has been created, managed by a Geographic Information System, a very effective tool, specially to the immediate response to multicriteria questions.Se presenta un estudio sobre la vulnerabilidad sísmica de edificios residenciales en la Comunidad Valenciana, como parte del Plan Especial frente al riesgo sísmico que dicha comunidad tiene obligación de elaborar al tener poblaciones con intensidades sísmicas superiores a VII grados, según la Escala Macrosísmica Europea. Se exponen los resultados y metodología seguida para identificar las características constructivas de la región, antigu.edad de sus edificios, asignar clases de vulnerabilidad sísmica, estimar daños potenciales ocasionados por un probable sismo, así como cartografiar el riesgo derivado. Se destaca la estimación de un daño grave del 13 % del número de edificios para la provincia de Alicante, disminuyendo en las provincias de Valencia y Castellón hasta el 8 % y el 0,2 %, respectivamente. Para la gestión de la información se ha creado una geodatabase, administrada por un Sistema de Información Geográfica, herramienta que ha resultado muy eficaz, especialmente para la respuesta inmediata a

  15. Nota sobre colisiones de aves en las ventanas de edificios universitarios en Puerto Vallarta, México

    Directory of Open Access Journals (Sweden)

    Fabio Germán Cupul-Magaña

    2015-06-01

    Full Text Available Esta nota presenta las observaciones de 15 colisiones de aves en ventanas de edificios de la Universidad de Guadalajara en Puerto Vallarta, Jalisco, México, a lo largo de 94 días de estudio (24 de enero al 27 de abril del 2003. Columbina passerina fue la especie que presentó el mayor número de fatalidades: ocho.

  16. Beneficios económicos de la certificación LEED. Edificio centro Ático: caso de estudio

    Directory of Open Access Journals (Sweden)

    Óscar Ribero

    Full Text Available En el presente artículo se estudian los beneficios económicos de la aplicación del programa de certificación de construcciones sostenibles LEED, en el Edificio Centro Ático situado en Bogotá - Colombia. Inicialmente, se determinan los consumos de agua y energía eléctrica, y los costos de construcción y operación del edificio bajo su diseño original (construido sin tener en cuenta los parámetros establecidos por LEED. Seguido a esto se plantean estrategias para lograr que el edificio Centro Ático alcance la certificación LEED GOLD New Construction V3 2009 y se calculan los incrementos económicos asociados a éstas. Así mismo, se calculan los nuevos consumos de agua y energía eléctrica bajo la aplicación de dichas estrategias (diseño modificado y sus correspondientes costos de operación. Finalmente, se determinan los indicadores de bondad económica de la inversión mediante un análisis de flujo de caja.

  17. Exposición ocupacional a agentes químicos en la construcción de edificios Occupational exposure to chemicals in the construction of buildings

    Directory of Open Access Journals (Sweden)

    Gabriela Hernández Gómez

    2012-11-01

    Full Text Available Objetivos: (i estimar los niveles de exposición ocupacional a humos y polvos de cromo, hierro y manganeso y polvo inhalable de madera en tareas asociadas a la construcción de edificios; (ii generar una propuesta de matriz de exposición ocupacional a los agentes estudiados. Materiales y métodos: el estudio fue exploratorio e incluyó nueve proyectos de construcción de edificios de cinco empresas. Se utilizaron los métodos de muestreo y análisis descritos en OSHA ID121 y MDHS 14/03. Se determinaron los niveles de exposición ocupacional para el análisis de cumplimiento con el estándar nacional INTE 31- 08-04-01. Se estimó la influencia de los posibles determinantes de exposición mediante pruebas de asociación estadística. Resultados: La media de los niveles de exposición ocupacional para polvo inhalable de madera en carpintería fue de 3.55 mg/m3; se encontró relación entre el tiempo de muestreo y las concentraciones obtenidas. No se detectó la presencia de cromo en las muestras recolectadas. La media de hierro fue de 0.78 mg/m3; no se encontró relación entre las concentraciones y los posibles determinantes de la exposición. En manganeso, la media fue de 0.04 mg/ m3; la temperatura fue el factor con mayor influencia. Conclusiones: los niveles de exposición ocupacional a hierro, manganeso y polvo inhalable de madera variaron entre constructoras y proyectos. Las concentraciones de polvo se asociaron al tiempo de muestreo y no se encontró evidencia estadística significativa para los determinantes de la exposición a metales.Objectives: (i To estimate occupational exposure levels to chromium, manganese and iron fumes, and from wood dust in tasks related to building construction. (ii To propose an occupational exposure matrix to agents in study. Materials and methods: An exploratory study was carried including nine construction projects from five companies. Analytical Methods were based on documents: OSHA ID121 and MDHS 14

  18. Inspección mediante técnicas no destructivas de un edificio histórico: oratorio San Felipe Neri (Cádiz

    Directory of Open Access Journals (Sweden)

    Rodríguez Liñán, C.

    2011-03-01

    Full Text Available The main aim of this article is showing the results that have been obtained when non destructive techniques (ultrasound and thermography are applied to a building with an important artistic and historical value. These non-destructive techniques have been applied in the inspection of the wooden roof structure to detect different states of deterioration, loss of density and defects. The aim is the assessment the state of the preservation of the wooden structure. A fieldwork has been carried out, where the two techniques have been applied together, ultrasound, an effective technique to establish the diagnosis of a wooden structure, and the thermography, a technique less tested in the in situ inspection of this material. The aim is checking the range and the real possibilities of using of each technique. In this sense, the methodology of ultrasound developed and published by the authors is applied and the thermography like in situ inspection tool, analysing additional difficulties and interference parameters not found in laboratory. The conclusions of this study show that the union of the ultrasound technique and the thermography is a good tool for on-site inspection of wooden structures and to assess their conditions allowing establishing a proper diagnosis. Thermography can detect different moisture contents and different materials and, on the other hand, ultrasound detects different states of deterioration or loss of density in specific areas with a high moisture content of the pieces.

    El objetivo de este artículo es dar a conocer los resultados obtenidos al aplicar técnicas no destructivas de inspección (ultrasonidos y termografía durante las obras de reparación de un edificio de gran valor histórico y artístico. Estas técnicas no destructivas se han aplicado en la inspección de la cubierta de madera del edificio para detectar distintos estados de deterioro, pérdidas de densidad y defectos, con el objetivo de evaluar su

  19. Edificio de la Sociedad “La Rinascente”,en Roma, Italia

    Directory of Open Access Journals (Sweden)

    Albini, Franco

    1966-07-01

    Full Text Available This building has three levels below ground and seven floors above the ground. The power plant for various installations and storerooms are in the lowest basement, the dressing rooms for the staff and merchandise stores are in the second basement, and a supermarket occupies the first one. The ground floor and the next four floors are salesrooms and other offices connected with sales, whilst the top floor houses the company's headquarters. Because of its design and layout, and its general construction, this is one of the most refined and complex buildings that has been recently completed in Rome.Consta de: tres plantas de sótanos, planta baja y seis plantas sobre el nivel del suelo. El tercer sótano alberga las centrales de las instalaciones y almacenes de mercancías; el segundo sótano, los servicios, vestuarios de los empleados y almacenes de mercancías, y en el primero hay un supermercado. La planta baja y las cuatro primeras plantas están dedicadas a salas de venta; la quinta, a almacén de mercancías, y la sexta aloja las oficinas de la Sede de la Sociedad. El edificio, por su concepción, tratamiento y diseño, es uno de los más refinados y complejos que se ha construido en Roma durante los últimos años.

  20. Aerogenerador instalado en edificio multifamiliar: ¿Rentable o no? ¿Sostenible o no?

    Directory of Open Access Journals (Sweden)

    Guillermo Linares

    2016-01-01

    Full Text Available El propósito de este estudio fue determinar la sustentabilidad económica y ambiental de un aerogenerador horizontal prototipo instalado en un edificio multifamiliar. La sustentabilidad económica se determinó por estudio económico clásico primario y la sustentabilidad ambiental utilizando el enfoque emergético. El análisis económico clásico indica que el proyecto no es rentable (VAN = -2971,05 dólares americanos y el análisis ambiental (porcentaje de renovabilidad: 0,18; tasa de rendimiento de emergía: 1,23; tasa de carga ambiental: 4,48; índice de sustentabilidad energética: 0,275; relación de inversión energética: 4,35 y tasa de intercambio emergético: 0,32 indica una elevada dependencia del sistema respecto a maquinarias importadas, eficiencia media respecto al aprovechamiento de recursos locales en beneficio de la sociedad, bajo impacto ambiental y un costo de producción medio respecto a otros procesos de producción de electricidad.

  1. Empleo del penetrómetro para madera para el diagnóstico de la madera en servicio en edificios antiguos

    Directory of Open Access Journals (Sweden)

    Palaia, L.

    2014-03-01

    Full Text Available Instrumental technique applied in situ allows researchers to save time on diagnosis and minimize damage to the sound timber. Pilodyn testing may be a useful method of diagnosis of these structures. The case study is about an urban 19th century building in an historic area of Valencia, located very close to the original city foundation area. The building has brick bearing load walls, timber floors and a roof structure. A simplified diagnosis method of timber structures was performed: visual inspection carried out by qualified site surveyors using SDT, in this case the wood probing (Pilodyn. This method proved to be adequate to determine parameters and to obtain conclusions of the mechanical characteristics of the structural elements. A standardization proposal to use this instrumental may be developed in the future.Las técnicas instrumentales para ensayos in situ permiten a los expertos ahorrar tiempo en el diagnóstico y minimizar el daño que se produce en algunos casos a la madera sana, empleando técnicas tradicionales de diagnóstico. El empleo del Pilodyn para ensayos de penetración puede constituir un «método rápido» de diagnóstico de estas estructuras. Se presenta un caso de estudio de un edificio del siglo XIX construido en el centro histórico de Valencia. Los muros son de ladrillo y la estructura horizontal así como de la cubierta son de madera. Se ha realizado un método de diagnosis simplificado: inspección visual de la estructura y ensayos con Pilodyn. Este método resultó adecuado para determinar parámetros acerca de sus cualidades resistentes, abriendo una vía hacia una posible propuesta de normalización para el empleo de este instrumento.

  2. Análisis comparativo por ciclo de vida de tres tipos de luminarias empleadas en los interiores de edificios

    Directory of Open Access Journals (Sweden)

    Silverio Hernández Moreno

    2015-01-01

    Full Text Available Este trabajo consiste en la realización de un análisis comparativo por ciclo de vida entre tres tipos de luminarias usadas comúnmente en la actualidad en proyectos arquitectónicos y de iluminación artificial para interiores de edificios; comparando sus impactos ambientales para conocer cómo contribuyen de manera cuantitativa al calentamiento global principalmente por emisiones de CO2 a la atmósfera. El análisis se hizo a través de la información derivada de un Software de simulación del ciclo de vida de productos (GaBi®, usando particularmente la metodología llamada Evaluación por Ciclo de Vida (ECV que se enfoca principalmente en evaluar los impactos ambientales asociados a un producto a través de toda su vida útil, en concordancia con la norma técnica internacional ISO 14040 (referente a la metodología de Análisis por Ciclo de Vida. Los resultados muestran que el consumo eléctrico de la incandescente fue de 5.55 veces más que la luminaria fluorescente y 8.10 veces más que la de LED; la producción, uso y disposición final de la luminaria incandescente (49,334.4 CO2e en el ejemplo del presente estudio, contribuye al calentamiento global 29.87 veces más que la fluorescente (1,651.2 Kg. CO2e y 146.82 veces más que la de LED (336 Kg. CO2e. Se concluye que la luminaria LED es la mejor opción tomando en consideración todo el ciclo de vida completo del producto incluyendo el costo. Por otro lado, si solamente se valorara la fase de producción, la mejor opción sería la incandescente, pero por supuesto que sería un parámetro muy limitado porque se deben tomar en cuenta todas las fases del ciclo de vida incluyendo el análisis de costo por cada fase (de producción; de uso y mantenimiento y de fin de vida útil y disposición final. Respecto a la luminaria fluorescente podría ser la mejor opción ya que existe una amplia gama de productos en donde varian significativamente los precios y podría ser una buena opci

  3. Evaluación de modelos de turbulencia para predecir los flujos de masa de aire interzonas a través de una abertura de escalera para la convección natural y mixta en los edificios

    Directory of Open Access Journals (Sweden)

    Sergio Vera

    2015-08-01

    Full Text Available El objetivo principal del diseño de edificios es el proveer ambientes interiores productivos, confortables y saludables para sus ocupantes en balance con la eficiencia energética. Aberturas interiores de edificios, tales como las de escaleras, son huellas importantes para el intercambio de calor, aire, humedad y contaminantes. Los flujos de aire interzonas a través de aberturas horizontales no han sido estudiados profundamente debido a su naturaleza transiente y altamente inestable, la complejidad para realizar experimentos, y la escasez de datos experimentales disponibles. La Dinámica de Fluidos Computacional (CFD por su acrónimo en inglés es una excelente herramienta para avanzar en la comprensión de este fenómeno. En este artículo, se aplica CFD para evaluar el desempeño de cinco modelos de turbulencia de dos ecuaciones: k-ε estándar, k-ε RNG, k-ε realizable, k-ω estándar y k-ω SST, para predecir las condiciones del aire interior y los flujos de la masa de aire ascendente que fluyen a través de una abertura horizontal en una casa de ensayos de dos pisos a escala real. La investigación incluye seis casos con diferentes gradientes de temperatura entre los dos pisos y tres estrategias de ventilación que representan convección natural y mixta. Los principales resultados muestran que las temperaturas son predichas correctamente por todos los modelos de turbulencia, mientras que las velocidades del aire simuladas presentan variaciones mayores entre los modelos de turbulencia evaluados. En general, los modelos k-s estándar y k-ε realizable son los más precisos para predecir las temperaturas interiores y las velocidades de aire para la convección natural y mixta, respectivamente. Además, los flujos de la masa de aire ascendente a través de la abertura horizontal estimados por ambos modelos de turbulencia concuerdan muy bien con los datos experimentales.

  4. El edificio Botines de León. Cómo se hizo

    Directory of Open Access Journals (Sweden)

    González Moreno-Navarro, José Luis

    2002-12-01

    Full Text Available The authors provide historic data on the construction process of the Bolines Building and offer their interpretation of the reasons for the "style" Gaudí used for the facades and the volume of the whole. However; the main part is given over lo describing the structure of the building which they consider surprising. They explain the construction procedures -some of them remarkable-used by the architect in the foundations, structure and roof, including safety margins, according lo the geotechnical report drawn up in 1993, which substantiates the criticism by Gaudi's contemporaries regarding the foundations. It also shows that although the slender walls have stood up lo a hundred years of gravitational force. there is no safety margin. It aII explains that his original system for collecting and channeling rainwater on the roof -correct in it's structural design and construction- was not entirely advantageous for the occupants. The authors also draw attention to the way in which the restorers kept in mind the overall concept of the building and the care they look in its rehabilitation, although they had no alternative but lo correct "young " Gaudi and rectify all his constructional slips.Los autores del articulo aportan algunos datos históricos acerca del proceso de construcción del monumento, ofrecen su interpretación sobre las razones de cómo Gaudí compuso las fachadas y el volumen del conjunto y, principalmente, describen el edificio -al cual califican de sorprendente- desde el punto de vista estructural.Se explican los procedimientos constructivos -algunos bien singulares- utilizados por el arquitecto en cimientos, estructura y cubierta, reflejando el margen de seguridad que ofrecían según el informe geotécnico realizado en 1993. Éste ratifica, por ejemplo. que las criticas que recibieron en su día las cimentaciones eran justificados; demuestra, también, que a pesar de que el comportamiento durante los cien años que han durado las

  5. Modelado paramétrico de edificios en el aula de matemáticas

    Directory of Open Access Journals (Sweden)

    Raúl Manuel Falcón Ganfornina

    2012-07-01

    Full Text Available El estudio analítico de curvas y superficies adquiere una importancia significativa en estudios universitarios asociados a Arquitectura y Edificación, si bien suele desarrollarse en el aula de Matemáticas únicamente a nivel teórico. No obstante, cualquier herramienta informática de diseño gráfico que utilice el alumnado a lo largo de su vida académica y profesional a la hora de modelar proyectos arquitectónicos se basa internamente en una computación matemática de todos y cada uno de los elementos que intervienen en el mismo, si bien el usuario no llega a vislumbrar el vínculo existente entre su proyecto y la base matemática en la que se fundamenta. El uso de herramientas informáticas que permitan modelar curvas y superficies a partir de sus ecuaciones paramétricas se convierte por tanto en un nexo de unión, que se potencia aún más en cuanto se procede a modelar construcciones arquitectónicas reales. En este sentido, el presente artículo muestra cómo, haciendo uso de su conocimiento matemático y de la información disponible en internet, el alumnado de la asignatura de Matemática Aplicada a la Edificación en el Grado de Ingeniería de Edificación de la Universidad de Sevilla ha realizado como experiencia docente el modelado matemático de un conjunto de edificios de estructura no trivial. La mejora del rendimiento académico es también analizada.

  6. Caracterización de la carga a través de la determinación del coeficiente de sensibilidad con la frecuencia y de las desviaciones estándar de la misma en el Sistema Argentino Interconectado

    OpenAIRE

    Arnera, Patricia Liliana; Beroqui, Mario César; Bianchi Lastra, Raúl E.; Molina Milyus, Roberto D.; Gaido, Roberto

    1995-01-01

    Se midieron y registraron una gran cantidad de transitorios de la frecuencia del sistema provocados por eventos conocidos como pérdida de generadores y carga y descarga de bombas de la estación generadora de bombeo de Río Grande ubicada en la provincia de Córdoba, Argentina. Además se registraron variaciones rápidas de la potencia de carga en distintos nodos de la red. Con estas mediciones se procedió a estimar el coeficiente de sensibilidad de la carga a la frecuencia y a evaluar las desv...

  7. Edificio singular para la administración de una empresa en Venta de Baños, Palencia

    OpenAIRE

    Reyero Baños, Elena

    2014-01-01

    Proyecto de un edificio singular de oficinas para el control de una industrial. Constará de una parte administrativa y de atención al público, y otra más especifica en los distintos despachos. Se realizara la estructura metálica, distribución en tres plantas, incluye zona descanso y aseos para trabajadores, y todas las instalaciones necesarias Departamento de Ciencias de los Materiales e Ingeniería Metalúrgica, Expresión Gráfica en la Ingeniería, Ingeniería Cartográfica, Geodes...

  8. Emisiones contaminantes de materiales de construcción en el interior de los edificios. Caso de los tableros de yeso

    OpenAIRE

    Silverio Hernández Moreno

    2007-01-01

    Se presenta una evaluación deemisiones contaminantes de materiales deconstrucción de edificios, específicamente demateriales que se instalan en su interior y queoriginan problemas de salud a corto, medianoy largo plazos a los usuarios debido a lassustancias químicas que emiten. Se presentaun caso de estudio experimental en donde seevalúan los tableros de yeso que normalmenteson instalados dentro de los edificios paramuros divisorios y falsos plafones. Se parte dela base experimental de un esp...

  9. Cambiemos la percepción social hacia las personas con discapacidad desde el Servicio Comunitario

    Directory of Open Access Journals (Sweden)

    Zuleima Corredor Ponce

    2017-12-01

    Full Text Available Este artículo da cuenta de una experiencia desarrollada en la Universidad Nacional Abierta (UNA, Centro Local Zulia, relativa al diseño e implementación de un proyecto socioeducativo, cuyo objetivo fue promover un cambio en la percepción social hacia las personas con discapacidad, desde la actividad de Servicio Comunitario, para configurar una cultura inclusiva. El proyecto fue propuesto desde la UNA y se implementó una primera experiencia mediante una alianza estratégica con estudiantes de Servicio Comunitario de la Universidad Rafael Belloso Chacín (URBE. Se concluye que las alianzas entre universidades son una valiosa oportunidad para contribuir a la resolución de problemáticas sociales complejas, mediante proyectos de alto impacto; se observó un desplazamiento conductual en relación al tema en los estudiantes prestadores del servicio y se logró formar y sensibilizar a la comunidad. Se espera identificar nuevos nodos y consolidar una red interinstitucional en la que las personas con discapacidad sean actores fundamentales.

  10. Los principales ejemplos de la herencia Jesuítica en la provincia de Madrid y la ciudad de Guadalajara y sus vínculos con la Universidad Complutense

    Directory of Open Access Journals (Sweden)

    Gonzalo Fernández

    2011-01-01

    Full Text Available Este artículo estudia los primeros edificios de los Jesuitas en Madrid, Alcalá de Henares, Torrejón de Ardoz, y Guadalajara y sus vínculos con la Universidad Complutense donde el Dr. Federico Lara es ilustre profesor.This article surveys the early buildings of the Jesuits in Madrid, Alcala de Henares, Torrejon de Ardoz, and Guadalajara and its links with the University Complutense where Dr. Federico Lara is illustrious professor.

  11. Edificio para la nueva sede social de la empresa nacional de electricidad, S. A. Madrid/España

    Directory of Open Access Journals (Sweden)

    Población, Eleuterio

    1986-04-01

    Full Text Available In this work, the design and execution of ENDESA building, in Madrid, is fully described. It is a compound of a twelve-storeyed and a two-storeyed buildings, separated by a garden. Being placed in a central district, a special adaptation to the bylaws was necessary concerning the volume and use conditions. Among its most remarkable characteristics it could be pointed out the subjection to a modular frame, the adequacy of the spaces for the activities that are to be developped in it and the adopted solutions for its closure.En el presente artículo se describe detalladamente el proyecto y ejecución del edificio ENDESA, en Madrid, compuesto por dos edificios de doce alturas uno, y dos el otro, unido por un espacio ajardinado. En céntrica situación ha exigido una especial adaptación a las Ordenanzas Municipales en cuanto a condiciones de volumen y uso. Entre sus características más notables pueden señalarse IQ sujeción a una red modular, la adecuación del espacio a las actividades que en él se desarrollarán y las soluciones adoptadas para su cerramiento.

  12. Los edificios deportivos de la Roma Antigua Sportive buildings in the ancient Rome

    Directory of Open Access Journals (Sweden)

    Angela TEJA

    2013-09-01

    Full Text Available La educación física y el deporte retrocedió —en la Roma antigua— respecto a los ideales físico-corporales griegos. Por contra, se fomentó una notable cultura de espectáculos y divertimentos, especialmente durante la época imperial. A fin de dar cobijo a los diversos espectáculos se construyeron en la ciudad de Roma —y por mimetismo en todas las urbes del Imperio— sofisticados edificios. En efecto, además de una importante red de circos —el más emblemático de los cuales fue el circo Máximo—, se levantaron anfiteatros y termas, amén del estadio de Dominiciano. La autora pasa revista a las distintas instalaciones «deportivas» de la Roma antigua, así como a los espectáculos que albergaban: las carreras del circo, los combates de gladiadores, las cacerías de fieras, las naumaquias, sin olvidar las competiciones del estadio y la pasión romana por las termas.Sport and physical education —in Ancient Rome-, looked back to the physical ideals of the Greeks. In contrast, there was also a specific encouragement of spectacles and performance or general entertainment during the Imperial Era. In order to cater for the diverse shows, sophisticated buildings were constructed in Rome, and reproduced in all the built-up areas throughout the Empire. In fact, besides the important circus network, the most emblematic of these being Maximo's Circus, amphitheatres, arenas and spa resorts were constructed, in addition to the Dominitian Stadium. The author studies the different types of «sporting» installations in Ancient Rome, considering the entertainments which took place in them: chariot races, gladiatorial combat, the hunting of wild beasts, naval combats, the stadium sports and, of course, the Roman passion for spas and hot baths.

  13. Nodos, redes y áreas de influencia ferroviaria en la articulación territorial de la provincia de Sevilla

    Directory of Open Access Journals (Sweden)

    Antonio Gavira Narváez

    2013-01-01

    Full Text Available Los cambios socioeconómicos y territoriales acontecidos principalmente desde la década de los noventa en la provincia de Sevilla han ocasionado que muchos municipios dependan directa - mente del mercado laboral de la capital sevillana o de algunos de los núcleos de su aglomeración, como Alcalá de Guadaíra o Dos Hermanas. Este nuevo contexto socioeconómico se ha topado, en general, con la escasa adecuación de los medios públicos de transporte a las necesidades de los usuarios. Ante estos problemas, las diferentes Administraciones están promoviendo la diversificación de la oferta actual de transporte público, incorporando opciones más respetuosas con el medio ambiente, como el ferrocarril convencional, metro o tranvía. Asimismo, se apuesta por el uso combinado de diferentes medios de transporte, siendo la base de los desplazamientos el ir a pie o en bicicleta, completado principalmente por los diferentes modos ferroviarios y por el autobús. Medios colectivos que son idóneos para descongestionar grandes arterias y cubrir rutas que son utilizadas con asiduidad por grandes grupos de población.

  14. Comportamiento frente a la durabilidad de morteros de reparación de cemento modificados con polímeros

    OpenAIRE

    González Lucas, Ángel

    2014-01-01

    El auge que ha surgido en los últimos años por la reparación de edificios y estructuras construidas con hormigón ha llevado al desarrollo de morteros de reparación cada vez más tecnológicos. En el desarrollo de estos morteros por parte de los fabricantes, surge la disyuntiva en el uso de los polímeros en sus formulaciones, por no encontrarse justificado en ocasiones el trinomio prestaciones/precio/aplicación. En esta tesis se ha realizado un estudio exhaustivo para la justificación de la ...

  15. Actualidad y perspectivas de una bomba de calor de expansión directa con energía solar

    OpenAIRE

    Gorozabel-Chata, Francis-B.; Carbonell-Morales, Tania

    2016-01-01

    La bomba de calor de expansión directa con asistencia de energía solar se utiliza en el modo de calefacción para diversas aplicaciones entre las que podemos citar, calentamiento de agua, calentamiento de aire para climatizar edificios, desalinización de agua, secado solar entre otras. El presente trabajo revisa las principales investigaciones sobre esta tecnología enfocando sus aplicaciones para el calentamiento de agua, para lograr este objetivo se describen en detalle la configuración básic...

  16. Evaluación ergonómica de puesto con pantalla de visualización

    OpenAIRE

    Guerrero, Francisco Javier

    2012-01-01

    Para completar el Máster en Prevención de Riesgos Laborales se necesita elaborar un Trabajo Final basado en una de las especialidades técnicas preventivas. El Trabajo que se presenta versa sobre la especialidad de Ergonomía y Psicosociología Aplicada y dentro de ésta se ha optado por la realización de una evaluación ergonómica sobre un puesto de trabajo que utiliza pantalla de visualización de datos. El centro de trabajo donde se ubica el puesto es un edificio con oficinas y otros servi...

  17. Sistema de edificación de viviendas con elementos prefabricados de hormigón armado

    OpenAIRE

    Caballero Vinueza, Otto Santiago; Rodriguez Rios, Julio

    2009-01-01

    La elaboración de esta tesis tiene por objetivo, dar a conocer en mayores proporciones las ventajas de la Prefabricación en la Ingeniería Civil. El modelo de la vivienda que se presenta en esta tesis, no es el único que existe, se puede diseñar una infinidad de variedades, desde una vivienda de dos niveles hasta un edificio de varios pisos de altura. Los elementos prefabricados serán construidos con hormigón armado, que es el material más común en nuestro medio. El diseño de paneles y...

  18. La integración de sistemas activos de producción energética en la envolvente del edificio : taxonomía constructiva

    OpenAIRE

    París Viviana, Oriol

    2013-01-01

    Analisis de una metodología de clasificación para la integración de los sistemas fotovoltaicos en la envolvente del edificio. Para clasificar los diversos sistemas existentes en el mercado actual se ha teniendo en cuenta tanto la posición relativa que estos ocupan en la envolvente como los sistemas de soporte necesarios para su montaje

  19. Adaptación de nave-almacén existente en el lETcc, como edificio destinado a la realización de cursos y seminarios

    Directory of Open Access Journals (Sweden)

    Gómez Fernández, Felipe

    1981-05-01

    Full Text Available Ante la proximidad de la celebración del CEMCO 82 (Curso de Estudios Mayores de la Construcción destinado fundamentalmente a postgraduados iberoamericanos, así como la simultánea realización de una serie de seminarios sobre temas monográficos de edificación, la Dirección del lETcc contempló la posibilidad de adaptar una nave-almacén, de una superficie aproximada de 500 m2, para albergar estos nuevos usos que permitiera, al mismo tiempo, eliminar las Interferencias que se producían en la normal actividad del Instituto cuando se celebraban este tipo de Cursos y otros similares, así como reuniones de comisiones técnicas y de elaboración de normas, que por otra parte se desarrollaban en espacios poco adecuados funcionalmente. Sí bien la adecuación de una nave exenta con referencia al edificio fundamentad del lETcc plantea algunos problemas funcionales, también permite obtener ventajas de suficiente peso sobre todo en lo que se refiere a actividades, que aunque se incluyen entre las normales del Instituto, tienen una cierta autonomía que permite puedan ser realizadas en una construcción independiente a la que por otro lado se le ha dotado de una serie de servicios que permitan su funcionamiento como unidad orgánica autosuficiente.

  20. Fachadas ventiladas activas para reducir la demanda de calefacción en los edificios de oficinas. El caso de España

    Directory of Open Access Journals (Sweden)

    Irulegi, O.

    2012-12-01

    Full Text Available This paper analyses the energy efficiency of a Ventilated Active Façade –VAF– applied to office buildings in Spain to reduce heating demand. This façade system consists of an outer layer element of 2 mm galvanized steel panels and a 3 cm air cavity where the ventilation air is preheated in winter and exhausted in summer. After defining 8 typical office typologies in Spain, 192 study cases are obtained where different parameters like the percentage of glass in façade, the orientation and the climatic zone of the buildings are considered. The energy demand of all these study cases is obtained using the official simulation tool of the Spanish Technical Building Regulation – CTE called LIDER. The results, in terms of reduction of heating demand, are presented in comparison with the minimum energetic requirements of CTE.

    En este artículo se analiza la eficiencia energética de una Fachada Ventilada Activa –FVA– aplicada a edificios de oficinas en España para reducir la demanda de calefacción. El sistema de fachada consiste en una hoja exterior de 2 mm de acero galvanizado y una cavidad de 3 cm donde el aire de ventilación es precalentado en invierno y extraído en verano. Tras definir 8 tipologías típicas, se han obtenido 192 casos de estudio en los que se consideran diferentes parámetros: la superficie acristalada, la orientación y la zona climática. El cálculo de la demanda energética de los casos de estudio ha sido llevado a cabo mediante el programa LIDER, el método general del Código Técnico de la Edificación – CTE. Los resultados obtenidos en términos de reducción de la demanda de calefacción, se muestran comparados con los mínimos requerimientos exigidos en el CTE.

  1. Método basado en clasificadores k-NN parametrizados con algoritmos genéticos y la estimación de la reactancia para localización de fallas en sistemas de distribución.

    Directory of Open Access Journals (Sweden)

    Andrés Zapata-Tapasco

    2014-01-01

    Full Text Available En este artículo se presenta una estrategia de parametrización de un localizador de fallas basado en una técnica simple pero eficiente de aprendizaje, conocida como k vecinos más cercanos (k-NN. Esta técnica se complementa con un método plenamente probado de localización basado en la estimación de la impedancia de falla. La estrategia híbrida se validó en un circuito prototipo real, con resultados de error aceptables para aplicaciones en sistemas de distribución de energía eléctrica. Finalmente y como ventaja importante de la metodología propuesta se resalta la facilidad de implementación, cuando se trata de circuitos de distribución reales (más de 100 nodos.

  2. Solución de redes de flujo para gases usando el modelo de balance de nodos y el método de linealización de ecuaciones

    Directory of Open Access Journals (Sweden)

    Paulo César Narváez

    1999-09-01

    Full Text Available El dimensionamiento de redes de distribución de gases es un problema complejo, tanto por la diversidad de los fenómenos que se presentan, como por la variación de las propiedades de los fluidos, en especial, la densidad por efecto de los cambios en la presión a lo largo de la red. Este trabajo presenta un modelo para su simulación a partir de la deducción de la ecuación general de flujo en estado estable e isotérmico, su inclusión en el modelo de balance de nodos y la solución de este por el método de linealización de ecuaciones. Adicionalmente, se hace un resumen de las ecuaciones empíricas más usadas para el cálculo de la caída de presión para gases fluyendo en tuberías y un ejemplo que ilustra la aplicación del modelo y el método desarrollado.

  3. Anatomía y fisiología de la edificación: una manera de entender los edificios para su diseño y construcción

    OpenAIRE

    Escorcia Oyola, Olavo

    2008-01-01

    El documento está dividido en tres partes, la primera se dedica a establecer el contexto y las exigencias que hacemos al hábitat construido –internas de un edificio- como contraste a lo que nos brinda el hábitat natural –externas al edificio- discriminándolas en exigencias de habitabilidad y económicas. La segunda parte y propuesta fundamental de este ensayo, se concentra en entender y explicar el edificio como un “organismo arquitectónico” cuyos sistemas constitutivos responden sistémicament...

  4. Una mezquita de «nueve bóvedas» en Córdoba. Estudio arquitectónico de un edificio desaparecido en 1725

    Directory of Open Access Journals (Sweden)

    García-Ortega, Antonio Jesús

    2012-06-01

    Full Text Available After the Castilian conquest of Córdoba in 1236, a small mosque next to the Guadalquivir River was converted into the parish church of San Nicolás de la Ajerquía. The building was extended until the mid-sixteenth century and repeatedly transformed over time. However, the ancient Islamic building existed until its demolition during the important reforms of the period 1725-1727. There are several documentary records of those years, and also a plan sketch preserved in the parish archive. However, this mosque has gone virtually unnoticed by the specialized historiography, perhaps because the limited and ambiguous data hinder a proper valuation of its architectural form. In this study the original drawing has been analyzed, contextualizing it with several plans and historical documents. This has produced a hypothesis about the size of the mosque’s prayer hall, its approximate orientation, as well as its interior architectural organization: an almost square plan, subdivided into nine areas covered with vaults. Therefore, it could be framed within a type of mosque detected long ago by Creswell, who called it “ninedome- mosque”. The building would be the only known example of such architectural type in Córdoba.

    Tras la conquista castellana de Córdoba, en 1236, la nueva parroquia de San Nicolás de la Ajerquía aprovechó como iglesia una pequeña mezquita junto al río Guadalquivir. El edificio, ampliado a mitad del siglo XVI y reiteradamente transformado a lo largo del tiempo, mantuvo la preexistencia islámica hasta las importantes reformas del período 1725-27, que supusieron su total demolición. Pese a que existen varias alusiones documentales de aquellos años y un dibujo a mano alzada de la planta conservado en el archivo parroquial, esta mezquita ha pasado prácticamente inadvertida en la historiografía especializada, quizás porque los escasos y ambiguos datos conocidos no permiten estimar su arquitectura. En este trabajo se

  5. Evaluación del Impacto de la Generación Distribuida mediante Índices Normalizados con base en la Normatividad Colombiana y Estándares IEEEImpact Assessment of Distributed Generation using Standardized Indexes based on Colombian Regulations.

    Directory of Open Access Journals (Sweden)

    Diego González Herrera

    2015-09-01

    Full Text Available Se presenta una breve revisión de la literatura científica referente a índices normalizados en calidad de potencia y el marco regulatorio colombiano; el trabajo fue motivado por el reto de otros autores de plantear índices para evaluar el impacto de las perturbaciones de calidad de potencia (con enfoque cualitativo y cuantitativo, sin y con generación distribuida. Por ende se presenta una propuesta de índices normalizados (  Regulación de tensión,  sobretensión y subtensión,  corriente de falla,  amplitud de hueco de tensión,  distorsión armónica total en tensión,  distorsión de la demanda total implementada en un sistema de 34 nodos de IEEE, los cuales son comparados con los propuestos por dichos autores.

  6. Óxidos de estaño: nuevos ánodos para baterías de Ion-Litio

    Directory of Open Access Journals (Sweden)

    Morales, J.

    1999-12-01

    Full Text Available The electrochemical reaction between Li and tin-based compounds, is reversible and takes place at low potentials measured against the Li electrode. This feature allows the use of these materials as negative electrodes in the manufacturing of Li-ion batteries. The lithium insertion in the tin oxides leads to the formation of Li-Sn alloys. The presence of large tin clusters, formed during the reaction, causes the cracking and crumblimg of the anodic material and the electronic contact between the particles is lost. The electrochemical performance of these materials can be optimized by controlling the growing and size of tin aggregates.

    La reacción entre el litio y óxidos o aleaciones de estaño es reversible cuando se realiza por métodos electroquímicos y a bajos potenciales con respecto al electrodo de litio. Esta propiedad permite el uso de estos materiales como electrodos negativos en el diseño y construcción de baterías tipo ion-litio. En el caso de óxidos de estaño la reacción de inserción de litio en la matriz conduce a la formación de aleaciones Li-Sn. La presencia de agregados grandes de átomos de estaño, formados durante la inserción de litio, origina la fragmentación y el desmoronamiento del material anódico. Este efecto provoca la pérdida del contacto eléctrico entre partículas, con el consiguiente deterioro de la batería. La optimización del rendimiento electroquímico de estos materiales se puede lograr mediante el control del crecimiento y tamaño de los agregados de estaño.

  7. Plan de respuesta a emergencia en el edificio de la I. Municipalidad de Cuenca

    OpenAIRE

    Sánchez Quezada, Nelly Magaly

    2009-01-01

    La importancia del desarrollo del Plan de Respuesta a Emergencia (PRE) radica en prever que todo suceso considerado Emergencia, sea este originado por evento tecnológico (incendio) natural (sismo) o social (vandalismo y disturbio social), tenga los menores efectos posibles sobre los seres humanos, instalaciones y bienes materiales en general. El desarrollo del PRE toma como referencia de partida, una observación al cumplimiento o no de normativas relacionadas con la seguridad en edificacio...

  8. Edificio de viviendas. Ca´Granda, Milán

    Directory of Open Access Journals (Sweden)

    Gandolfi, Vittorio

    1959-04-01

    Full Text Available Con el nombre de "Ca'Granda" se ha querido designar el distrito, capaz de 6.000 habitantes, que el Ayuntamiento de Milán está construyendo, y en parte ha construido ya, en la zona detrás de las calles Fulvio Testi y Ospedale Maggiore; es decir, en el sector norte de la ciudad correspondiente a la dirección de mayor impulso del desarrollo urbanístico de lo habitado.

  9. Escayola aligerada con sólidos celulares

    Directory of Open Access Journals (Sweden)

    del Río Merino, Mercedes

    1998-12-01

    Full Text Available The following paper pretends to analyze the different cellular fillers, that are mainly used in building construction as lightweighters, in order to establish the most suitable ones for the manufacture of plasterboard. A model of compound of gypsum+filler is proposed here which would greatly reduce the weight of the plasterboard panels to improve the construction efficiency on the building site and to reduce the fracture risks in the transportation to the building site.

    El presente trabajo pretende estudiar cuáles de las diversas cargas celulares que se utilizan en el mercado de la construcción de edificios como aligerantes, son las más adecuadas para la prefabricación de elementos de escayola. Se propone, por tanto, un modelo de material compuesto, Escayola+carga, con el que se conseguiría reducir el peso de los prefabricados de escayola en beneficio de un mayor rendimiento en la puesta en obra, con un menor número de roturas y desconchones en el transporte hasta la misma.

  10. ATON - Informe sobre el estado del arte de la FV integrada en edificación, y productos y tecnologías FV actuales con enfoque en la tecnología de capa fina

    OpenAIRE

    Masseck, Torsten; Fonseca Casas, Antoni; Godoy Muñoz, Alfonso

    2012-01-01

    Informe sobre el estado del arte de la FV integrada en edificación en el marco del projecto ATON (CENIT-E), convenio UPC-ACCIONA Instalaciones El proyecto ATON en su Actividad 10: Integración arquitectónica persigue la búsqueda de conceptos innovadores para la integración de sistemas fotovoltaicos de lámina delgada o Thin-film en entornos urbanos, con énfasis en edificios. En colaboración con Acciona, el equipo de trabajo de la UPC ha realizado estudios de integraciones singulares de in...

  11. Notas técnicas: Nodos de información para el fortalecimiento municipal en gestión de riesgo

    Directory of Open Access Journals (Sweden)

    Vallejos Vásquez, Sheily

    2011-12-01

    Full Text Available Describe las actividades realizadas por el Centro de Documentación e Información de la Comisión Nacional de Prevención de Riesgos y Atención de Emergencias, con respecto una de sus metas estratégicas: Crear capacidades en los comités municipales de emergencias orientados al manejo y administración de información sobre la gestión del riesgo, mediante la tecnología de información y comunicación. Las actividades consistieron en dos talleres, uno en San José y otro en Liberia, dirigido a diferentes funcionarios municipales, geólogos, geógrafos, bibliotecarios, entre otros, a los cuales además se les entregó varios materiales. Adicionalmente se realizó un tercer taller dirigido a los documentalistas de la Red de Información Sobre Desarrollo Sostenible y Desastres It describes the activities developed by the Documentation and Information Center of the National Commission of Risk Prevention and Emergency Response in regards to one of its strategic goals: develop capacities in the emergency municipal committees addressed to administer information about risk management, through information technology and communication. Activities consisted of two workshops: one in San José and another one in Liberia, addressed to different municipal employees, geologists, geographers, librarians, among others. They received several materials. There was also a third workshop addressed to documentarists of the Information Network about Sustainable Development and Disasters

  12. Un acercamiento a los valores patrimoniales del edificio de la Facultad de Ingeniería de la Universidad de Costa Rica

    Directory of Open Access Journals (Sweden)

    Rafael Ángel Venegas Arias

    2018-01-01

    Full Text Available Este ensayo es un acercamiento al edificio de la Facultad de Ingeniería en la Sede Rodrigo Facio Brenes de la Universidad de Costa Rica para su puesta en valor como patrimonio histórico-arquitectónico. Se hace una revisión histórica del inmueble y paralelamente se analizan distintos valores que pueden ser asignados al mismo, los cuales han sufrido un proceso de invisibilización. Los valores analizados en este ensayo son: simbólico, conjunto, objeto de diseño, documento histórico, espacio público y obra de arte; tomando en cuenta conceptos de política, historia, arquitectura e ideología. Para el desarrollo de este ensayo se utilizan los principios de la semiótica, abordando el edificio como un lenguaje que debe ser analizado e interpretado.

  13. Desarrollo emprendimiento inmobiliario edificio multifamiliar en el distrito de San Juan de Lurigancho.

    OpenAIRE

    Vásquez Cisneros, Giancarlo Noel

    2014-01-01

    La presente tesis tiene como primer objetivo definir las condiciones de demanda y de oferta de vivienda reales en dicho mercado, argumentando sus alcances e identificando al segmento de compradores, y luego proponer un producto inmobiliario pequeño (proyecto de una edificación de cuatro pisos) con planeamiento y factibilidad que en si mismos no son el objetivo de la tesis, pero dicho producto nos permitirá obtener los factores críticos de éxito que los próximos proyectos inmobiliarios en este...

  14. Metodología para el diagnóstico y mejoramiento de los edificios del sector salud a partir del concepto de sustentabilidad

    OpenAIRE

    Martini, Irene

    2005-01-01

    Se plantea desarrollar una metodología para el diagnóstico, diseño, construcción y reciclado de los edificios del sector salud a partir del concepto de sustentabilidad ambiental y producir pautas de mejoramiento a partir de las variables críticas identificadas. (Párrafo extraído del texto a modo de resumen)

  15. Monitoreo de funcionamiento y estrategias de eficiencia energética para el edificio público de Obras Sanitarias Sociedad del Estado, San Juan, Argentina

    Directory of Open Access Journals (Sweden)

    Yesica Alamino Naranjo

    2015-06-01

    Full Text Available El incremento de la potencia instalada en los sectores de consumo, por encima de la capacidad de generación, en los últimos diez años, sitúa a Argentina como país dependiente energéticamente. Una de las medidas de mitigación de las consecuencias ambientales, sociales y económicas asociadas, consiste en reducir el consumo de energía en los edificios. La sociedad pasa más del 30% de su tiempo en espacios de trabajo, en ambientes climatizados. Es objetivo del trabajo es encontrar estrategias de mejora sobre la eficiencia energética del edificio sin disminuir la calidad de vida de los usuarios. Para ello, se lleva a cabo un estudio de campo en el edificio sede de Obras Sanitaria Sociedad del Estado (OSSE, ubicado en la ciudad de San Juan (Argentina, mediante una aproximación experimental, contemplando aspectos funcionales, tecnológicos y referentes al equipamiento del edificio. Los resultados muestran valores de demanda de energía elevados en sistemas de climatización y artefactos de consumo eléctrico en oficinas. La implementación de estrategias de intervención de mínima inversión permitiría reducir el consumo energético en un 42% y recuperar más del 70% de la inversión durante el primer año de funcionamiento.

  16. Quito, ciudad de maestros: arquitectos, edificios y urbanismo en el largo siglo XVI

    Directory of Open Access Journals (Sweden)

    Marta Fajardo de Rueda

    2014-06-01

    Full Text Available Con una amplia bibliografía y una cuidadosa documentación, este libro da cuenta del trabajo de los hábiles artistas y artesanos, tanto europeos como indígenas y criollos, que contribuyeron a la edificación de la Quito colonial entre 1580 y 1720. Como ocurrió con la pintura y con la escultura, la arquitectura en América también se inspiró con frecuencia en los grabados que provenían de Europa, hábilmente interpretados y adaptados por estos artistas. La autora cumple una labor meritoria al rescatar, a través de las obras y documentos de archivo, los nombres y etnias de muchos artistas indígenas, cuyo trabajo no había sido suficientemente reconocido por los historiadores. Con una bella presentación, el libro está novedosa y ampliamente ilustrado por la autora Susan Verdi Webster y los fotógrafos Hernán Lautaro Navarrete y Christoph Hirtz.ABSTRACTWith an extensive bibliography and careful documentation, this book describes the work of skilled artists and craftsmen —European, indigenous and Criollo—, who contributed to the building of colonial Quito between 1580 and 1720. As with painting and sculpture, architecture in America was often inspired by the engravings that came from Europe, skillfully interpreted and adapted by these artists. The author deserves credit for rescuing, with the aid of the buildings themselves and archival documents, the names and ethnicities of many indigenous artists whose work had not been sufficiently recognized by historians. The book is beautifully designed and extensively illustrated by the author, Susan Verdi Webster, and photographers Hernán Lautaro Navarrete and Christoph Hirtz.RESUMOCom uma ampla bibliografia e uma cuidadosa documentação, este livro dá conta do trabalho dos hábeis artistas e artesãos, tanto europeus como indígenas e crioulos que contribuíram à edificação da grande cidade de Quito colonial entre 1580 e 1720. Como ocorreu com a pintura e com a escultura, a arquitetura

  17. Validación de la herramienta metodológica de Alonso-Frank & Kuchen para determinar el indicador de nivel de eficiencia energética del usuario de un edificio residencial en altura, en San Juan – Argentina

    Directory of Open Access Journals (Sweden)

    Alción de las Pléyades Alonso Frank

    2017-06-01

    Full Text Available El sector residencial se presenta como el mayor consumidor de energía dentro del sector edilicio. Si bien en los últimos años se han incrementado las normativas/proyectos para establecer estrategias de uso racional y eficiente de la energía, aún se está en proceso. Este trabajo parte de la hipótesis que los usuarios son responsables del consumo energético no previsto durante el uso del edificio. El objetivo es validar una herramienta metodológica que exprese el Nivel de Eficiencia del Usuario (NEU de un edificio residencial en altura, ubicado en San Juan-Argentina. Para ello, se desarrolla un trabajo de campo mediante encuestas. Se relevan los hábitos que el usuario promedio emplea para satisfacer su condición de confort térmico en período cálido. Los resultados se traducen en una escala gráfica a modo de etiqueta. De la evaluación de los resultados se observa un empleo masivo de estrategias pasivas (no consumen energía por sobre aquellas de tipo activas, resultando un consumo de 14,6 kWh/m2.Persona. En correspondencia, el indicador NEU encontrado es del tipo “bueno”, y no tiene correlación con parámetros como edad del individuo, cantidad de personas por departamento o ubicación en altura, por lo que se concluye que es producto del nivel de conciencia sobre el uso racional de la energía (URE.

  18. Edificio de apartamentos en la Playa del Inglés

    Directory of Open Access Journals (Sweden)

    López Díaz, L.

    1978-11-01

    Full Text Available 432 apartments are distributed in the eight upper floors of this building, each including a bedroom, kitchen - dinning - living area, bath-room, laundry terrace and a small miscellaneous room near the entry vestibule. The public areas are located in an ample semi-basement and include a bar, a restaurant with kitchen area, night club, movie theater, shops, gymnasium with sauna bath, storage areas and a full range of facilities. The floorplan is Y-shaped to permit locating the vertical traffic core in its geometric hub, thus minimising the walking distance to each apartment. An interesting feature of the design is a pair of landscaped inner courtyards, one hexagonal in shape, surrounded by a ramp increasing the means for vertical movement of the public, and the other triangular, enclosed by the corridors leading to the apartments. The structural design is based on reinforced Steel construction and the façades are treated with prefab planters in a straight or a winding line enclosing respectively the galleries and the apartments terraces. The outside áreas include many and varied sports and recreational.

    En sus ocho plantas superiores se han distribuido 432 apartamentos compuestos de: dormitorio, cocina-comedor-estar, cuarto de baño, terraza con tendedero, y un pequeño trastero en el vestíbulo de entrada. Las dependencias comunes como: bar, restaurante, cocina, sala de fiestas, cine, locales comerciales, gimnasio con sauna, almacenes y toda una serie de instalaciones, se han ubicado en el amplio semisótano. Se ha aprovechado la conformación de la planta según una gran Y para situar el núcleo de comunicaciones verticales en su centro geométrico, lo que permite reducir al máximo los recorridos de acceso a cada apartamento. Nota interesante de la obra son los dos patios interiores ajardinados; uno hexagonal, circundado por una rampa que amplía el número de las comunicaciones verticales, y el otro triangular

  19. Edificio «Ennia» - Curaçao - Antillas Holandesas

    Directory of Open Access Journals (Sweden)

    Salomonson, Hein

    1978-10-01

    Full Text Available This is one of the first large constructions in the interior of the island, characterized by a configuration which wholly respects the traditional architecture of the archipelago, based on small square blocks of dwellings, and by the proper treatment of the facades which provides the necessary protection from the sun. The construction, made up of three blocks of a square floorplan four stories high —with a semi-basement for installations—, is closed on the outside by means of prefabricated concrete elements which, with their cross-section in the shape of a U, fulfill four different functions: to conceal the perimetral pilars of the structural system; to produce, with their arrangement, deep grooves making it possible to adequately fix the position of the Windows; provide proper support for the horizontal placement of the louvers; and finally, to create, by their conformation, interior hollow spaces which can be used as closets. The complementary treatment of the interior spaces achieves a pleasant atmosphere and ideal working conditions, through the use of simple materials and systems which can be easily handled.

    Se trata de una de las primeras grandes construcciones en el interior de la isla, caracterizándose por una configuración que respeta íntegramente la arquitectura tradicional del archipiélago, basada en pequeños bloques cuadrados de viviendas, y por el correcto tratamiento de las fachadas que proporciona la debida protección solar, tan necesaria en estas latitudes. La construcción, constituida por tres bloques de planta cuadrada y cuatro niveles de altura —con un semisótano de instalaciones—, se cierra exteriormente por medio de unos elementos prefabricados de hormigón que, con su sección transversal en forma de U, cumplen cuatro funciones distintas: ocultar los pilares perimetrales del sistema estructural; producir, con su disposición, profundas hendiduras que permiten emplazar adecuadamente las ventanas

  20. BALANCEO DE CARGA EN REDES DE CONMUTACIÓN DE ETIQUETAS CON RSLB Y TLSB

    Directory of Open Access Journals (Sweden)

    Luis Alejandro Beltrán Castañeda

    2013-01-01

    Full Text Available Un aspecto importante en el estudio y la investigación actual a nivel de redes de comunicaciones, es el relacionado con la Ingeniería de Tráfico (TE, ya que posibilita la optimización en el uso de los recursos y mejora la operabilidad de la red. Un tema considerado por la TE dada su importancia y aplicabilidad es el Balanceo de carga, el cual utiliza rutas paralelas existentes entre nodos de ingreso y egreso para distribuir los flujos de información transmitidos en la red, lo que contribuye a la disminución de la congestión a través del ruteo y control de tráfico de acuerdo a los recursos existentes en los entornos backbone. Este artículo presenta los resultados encontrados al integrar los algoritmos de balanceo TSLB y RSLB en una red MPLS incluyendo TE a nivel de rendimiento y funcionalidad.

  1. Deterioro de las cerámicas y vidrieras del edificio del Ayuntamiento de San Sebastián

    Directory of Open Access Journals (Sweden)

    Alava, J. I.

    1998-12-01

    Full Text Available The ornamental ceramics and stained-glass windows of the City Hall building of San Sebastian have been studied. This building is a national monument which has been restored recently. It has been studied the origin of the observed high deterioration degree of the superficial enamel of these ceramics. We have concluded that the deterioration has a physicochemical origin. The biological origin has been excluded because of the high concentration of heavy metals leached from the enamel which avoid the growth of microorganisms. It has also been observed an increase of some elements and the loss of another ones in the first µm of depth.

    Se ha estudiado las cerámicas y las vidrieras que sirven de adorno al edificio del Ayuntamiento de San Sebastián, considerado monumento nacional, y que ha sido objeto de una reciente restauración. Se ha observado que las cerámicas presentan un alto grado de deterioro de la capa de esmalte superficial, y se ha estudiado el posible origen de este deterioro. Se concluye que el deterioro es de origen fisicoquímico, no pudiendo este ser de origen biológico debido a las elevadas concentraciones de metales pesados que lixivian de dicho esmalte y que impiden el crecimiento de microorganismos. Se ha observado asimismo que las vidrieras presentan un aumento de ciertos elementos y pérdida de otros en los primeros µm de profundidad.

  2. Metodología de inspección higrotérmica para la determinación de un factor intensidad de evaporación en edificios históricos

    Directory of Open Access Journals (Sweden)

    García-Morales, S.

    2012-12-01

    Full Text Available This paper presents what we call “Hygrothermal Inspection”. It consists in a first step in the way to quantify real water flux across constructions. Theoretical aspects are related to the fact that a wall, affected by rising damp, suctions water that will then evaporate from the surface, towards the internal and external air. This flux increases the humidity ratio of the internal air, mainly in the thin air coat in contact with the wall or pavement. This fact allows us to measure the relative evaporation intensity by means of a thermohygrometer and to map evaporation zones. Measuring method and results analysis are shown. Different evaporation levels from the walls or pavements are established by means of calculating what we call “Evaporation Intensity Factor (Fi”. Some results from several years work on Heritage Buildings are presented.

    En este artículo se presenta lo que hemos denominado “inspección higrotérmica”, que consiste en un primer paso en el diagnóstico de flujos de agua a través de los elementos constructivos. El fundamento se basa en que un muro afectado por un problema de capilaridad está sometido a una succión con un determinado caudal y esta agua evaporará en la superficie del muro o del suelo, incrementando el contenido en humedad (W de la lámina de aire en contacto con el paramento. Se describe el método de inspección y de análisis de los resultados. Se utiliza un termohigrómetro de lectura directa, y las lecturas se hacen siguiendo un protocolo que permite el análisis de variables. Los niveles de intensidad de los focos se establecen a partir de lo que hemos denominado “Factor de Intensidad de evaporación (Fi”. Se ilustra el método con ejemplos de estudios en varios edificios históricos.

  3. La construcción de edificios residenciales en España en el período 2007-2010 y su impacto según el indicador Huella Ecológica

    Directory of Open Access Journals (Sweden)

    González-Vallejo, P.

    2015-09-01

    Full Text Available This work identifies, in statistical reports, the main features of the homes built in Spain during 2007-2010; and the reports identify 10 representative types of residential buildings and construction solutions. The impact generated by these typologies is then assessed using the Ecological Footprint (EF indicator, obtaining, among other results, that single-family dwellings have a 45 % higher footprint than the multifamily buildings and that the manpower represents 30 % of the total EF. Also, the footprint is evaluated per construction phase and construction system, which determines that the elements with higher impact are the structure, masonry, finishes and foundation, in that order. Finally, the total EF of dwelling construction during the period and per dwelling occupancy is assessed.Se identifican en informes estadísticos oficiales, las características principales de las viviendas construidas en España durante el período 2007 a 2010, mostrando las 10 tipologías de edificios residenciales y soluciones constructivas representativas. Se evalúa el impacto generado por dichas tipologías empleando el indicador huella ecológica (HE, obteniendo, entre otros resultados, que las viviendas unifamiliares tienen un 45 % de huella superior a las plurifamiliares y que la huella que genera la mano de obra es un 35 % de la total. También se realiza el análisis de huella por fases de obra y sistemas constructivos, que determina que los elementos de mayor impacto son, estructura, albañilería, revestimientos y cimentaciones, por ese orden. Se finaliza con el cálculo total de HE durante el período objetivo y por persona de las viviendas evaluadas.

  4. La simulación digital como herramienta para el reacondicionamiento bioclimático de edificios = Digital simulation as a tool for bioclimatic re-conditioning of buildings

    Directory of Open Access Journals (Sweden)

    Andrea Sancho Salas

    2017-04-01

    Full Text Available El presente estudio propone e implementa una metodología para analizar el comportamiento de edificios existentes en respuesta a variables climáticas y geográficas específicas, mediante el uso de simulaciones termodinámicas digitales que permitan modificaciones para mejorar el confort interno. El análisis se realizó por medio de seis casos de estudio ubicados en tres zonas de vida de Costa Rica: Bosque Seco Tropical (Bs-T, Bosque Húmedo Premontano (Bh-p y Bosque Muy Húmedo Premontano (Bmh-p. Las edificaciones estudiadas son iglesias vernaculares de la época de 1901-1950. La metodología permite identificar los factores principales que influyen dentro del comportamiento térmico interior y establecer cuáles modificaciones se pueden implementar para lograr mayor bienestar, tanto en los casos de estudio, como en futuros diseños con condiciones similares. Abstract The present study proposes and implements a methodology to analyze the behavior of existing buildings in response to specific climatic and geographic variables, through the use of digital thermodynamic simulations that allow modifications to improve internal comfort. The analysis was carried out by means of six case studies located in three zones of life of Costa Rica: Tropical Dry Forest (Bs-T, Premontane Wet Forest (Bh-p and Premontane Very Humid Forest (Bmh-p. The buildings studied are vernacular churches dating from 1901-1950. The methodology allows to identify the main factors that influence the internal thermal behavior and to establish which modifications can be implemented to achieve greater welfare, both in the case studies and in future designs with similar conditions.

  5. Curia ordinis : uso epigráfico de un edificio singular

    Directory of Open Access Journals (Sweden)

    Angel A. Jordán

    2005-01-01

    Full Text Available El presente artículo analiza la realización epigráfica existente en las curiae ordinis, apreciando una serie de características comunes que la conforman y contribuyen a distinguirlas de otros conjuntos epigráficos. En segundo lugar, estos datos se ponen en relación con el conjunto epigráfico hallado en el templum Genii de Labitolosa, habitualmente identificado como una curia o templum ordinis, concluyendo que a través de su acerbo epigráfico no se puede inferir este último uso.The present article analyzes the epigraphic realization existent in the curiae ordinis, appreciating some common facts which characterize it and they contribute to distinguish them of other epigraphics series. In second place, these data put on in connection with the epigraphics monuments found in the templum Genii of Labitolosa, habitually identified as a curia or templum ordinis, concluding that through their epigraphic scathing we cannot infer this last use.

  6. La Maison Standar de Jean Prouvé en Meudon. Edificio, fachadas y paneles verticales

    Directory of Open Access Journals (Sweden)

    Laura Armesto Pineda

    2014-10-01

    Full Text Available En 1949 el ministro francés Eugène Claudius Petit visitó los talleres de Jean Prouvé en Maxeville. Acto seguido, el Ministerio de Reconstrucción y Urbanismo (M.R.U. encargó a Prouvé la planificación y desarrollo de una serie de casas de construcción ligera para la producción en serie, cuyo precio no debía superar el de una casa sencilla de la periferia construida de forma tradicional. El ministerio se comprometió a comprar 25 casas de este tipo y con ellas demostrar que la construcción ligera podía ser un procedimiento rápido y económico para poner fin a la escasez de viviendas en el periodo de posguerra. Finalmente, solo 14 de esas casas fueron construidas en Meudon, a las afueras de París. Su proyecto innovador, y el compromiso y dedicación de su autor, convirtieron a estas construcciones en un referente de la prefabricación aplicada al diseño y en verdaderas obras de arte que hoy día todavía pueden ser admiradas.

  7. Paciente con esquizofrenia tratado con ziprasidona + clozapina

    Directory of Open Access Journals (Sweden)

    Pol Yanguas E.

    2013-05-01

    Full Text Available P es un paciente diagnosticado de esquizofrenia, sigue en un piso tutelado un programa de rehabilitación, está medicado con clozapina 500 mg/día y ziprasidona 280 mg/ día. Padece hipercolesterolemia, tabaquismo y sus hábitos alimenticios no son buenos. La medicación que utiliza desde 2007 hasta ahora se refleja en la tabla 1. El último tratamiento se le introdujo el 7 de agosto de 2012, habiendo presentado un electro cardiograma (ECG normal, pero con ligera taquicardia ventricular y prolactinemia de 44,8 ng/ml (valores normales: 2-18 ng/ml.

  8. Aprendiendo de BBPR. El diálogo con la historia y con el contexto en las obras construidas en Palermo

    Directory of Open Access Journals (Sweden)

    Trovato, G.

    2011-06-01

    Full Text Available The article proposes an analysis of a series of buildings by BBPR in the city of Palermo between 1960 and 1974. In these works, littleknown due to their peripheral position and because they belong to the final period of their career, the relationship between the building and the public space becomes the main condition for the construction of the modern city. BBPR here uses various strategies: in some cases they work with history, understood as a catalogue of categorized items, prevails over the dialogue with the specific context. In the last work, Palazzo Amoroso, the opposite is the case: the main quality is its discretion and its ability to interact with the environment and its complex variables, through the volumetric articulation and the intentional use of materials. We present here the research in the Engineer Amoroso’s archives He introduced the Milanese group in Palermo commissioning the homonymous building.

    El artículo propone un análisis de los edificios construidos por BBPR en la ciudad de Palermo entre 1960 y 1974. En estas obras, poco conocidas por su posición geográfica marginal y por tratarse del periodo final de su carrera,la relación entre el edificio y el espacio público se defiende como principal condición para la construcción de la ciudad moderna. BBPR aquí utilizan diversas estrategias: en algunos casos el recurso a la historia, entendida como catálogo de elementos tipificados, prevalece al diálogo con el contexto específico. En la última obra, el Palazzo Amoroso, predomina el proceso inverso: se renuncia al protagonismo formal a favor de la integración en el contexto a través de la articulación volumétrica y a un uso sapiente de los materiales. Se presenta aquí el resultado de la investigación realizada en los archivos del Ingeniero Amoroso, que introdujo al grupo milanés en Palermo y les encargó el edificio homónimo.

  9. Eficiencia energética: estrategias aplicadas en el nuevo edificio de las Consejerías de Mérida (España

    Directory of Open Access Journals (Sweden)

    Montero, Eduardo

    2007-03-01

    Full Text Available The architecture office GOP was awarded the execution of the project for the regional government office building “Consejerías” in the city of Mérida, designed by Bruce S. Fairbanks, through an International Competition of Ideas summoned by the Junta de Extremadura. The new Consejerías in Mérida set the standards for a wholly sustainable building. It modifies its natural outdoors environment by soothing the climate and giving shelter. A design strategy was, among others, to gain as much confort as possible inside the building: thermal confort, visual confort, indoor air quality and acoustic quality. The new Consejerías underlying precept is to make a simple building, so they are designed to meet all these objectives by taking full advantage of architectonic means rather than requesting to technical fixtures for the conditioning of their indoor environment. The system designed to benefit from the inertia of the soil as a buffer for the building interior temperatures has never been used in Spain in large facilities, because they require large air volumes due to their low specific temperature. In this case, an air-to-earth heat exchanger was included in the project for a large institutional building.El Estudio GOP ha obtenido la adjudicación del proyecto del edificio de Consejerías en la ciudad de Mérida, diseñadas por Bruce S. Fairbanks, mediante el Concurso Internacional de Ideas convocado por la Junta de Extremadura. Las nuevas Consejerías de Mérida se constituyen como un ejemplo de edificio sostenible en todos sus aspectos. El edificio modifica el entorno natural externo moderando el clima y ofreciendo protección y cobijo. Entre las estrategias seguidas al diseñarlo está obtener el máximo confort en el interior: confort térmico, confort visual, calidad del aire interno y calidad acústica. Las nuevas Consejerías están diseñadas para alcanzar todos estos objetivos, manteniendo la idea subyacente de un edificio simple

  10. Estructura metálica del edificio social de la Mutua General de Seguros Barcelona – España

    Directory of Open Access Journals (Sweden)

    Busquets, Xavier

    1977-10-01

    Full Text Available This describes the solution adopted for the Mutua General de Seguros structure on the Diagonal in Barcelona. The building consists of six general basements and two elevated wings, one of thirteen stories and another of four, joined together on the third and second floors. The problems which had to be overcome were various in nature: from anchoring the concrete blocks in the underground floors to achieving maximum clear space —there are no intermediate supports on the office floors— this was achieved satisfactorily, on the higher floors by means of large span porticos, made up of two well-defined parts (the ground floor portico and the upper floor assembly], from both a structural and esthetic point of view.Se describe la solución adoptada para estructura de la Mutua General de Seguros, en la Diagonal de Barcelona. El edificio se compone de seis sótanos generales y dos bloques elevados, uno de trece plantas y otro de cuatro, debidamente enlazados por la segunda y tercera. Los problemas planteados fueron de muy diversa índole: desde la sujeción de las pantallas de hormigón de las plantas enterradas, hasta la consecución de la máxima diafanidad —en todas las plantas de oficinas no existen soportes intermedios— en las plantas altas a base de pórticos de gran luz, compuestos de dos partes bien definidas (el pórtico de planta baja y el conjunto de las superiores y acertadamente resueltos, desde el doble punto de vista estructural y estético.

  11. Dirección del proyecto para la construcción del casco habitable del edificio multifamiliar Pramin, aplicando estándares del PMI

    OpenAIRE

    Cabrejos Canevaro, Omar; Garrido Lovón, Johan; Herrera Stoll, Alberto; Ramírez Apón, Ernesto

    2017-01-01

    La presente tesis tiene como objetivo principal el desarrollo de la Dirección de un proyecto para la construcción del Casco Habitable del Edificio Multifamiliar Pramin, ejecutado por la empresa Construcciones Corbus S.A., aplicando los estándares de la Guía del PMBOK, quinta edición, se busca lograr una ventaja competitiva sostenible en el tiempo a través de un modelo de dirección eficiente en sus procesos que sirva como base actualizable para la ejecución de cada proyecto de la empresa a fin...

  12. La cimentación del edificio histórico de la Fábrica de Tabacos de la Universidad de Sevilla

    Directory of Open Access Journals (Sweden)

    González García de Velasco, C.

    2011-03-01

    Full Text Available One of the main works to be developed by the University of Seville in the building of “La Fábrica de Tabacos” restoration, consists of an underground galleries net to pass by installations and other facilitites for the new uses of this historic building. To execute these galleries, we need to know the dimensions and typologies of the building foundations and also the history of its construction, because it could reveal us the possible existence of archaeological remains. This paper investigates, both through the building history and through some specific underground explorations, the knowledge of this building foundations and the real possibilities to carry out these galleries without archaeological incidences. The building sits on a land formerly depressed and later excavated to the full extent of the plant, and whose foundations were executed from below as walls and pillars, and being later all the plant filled to the ground level by providing current soil.

    Una de las principales obras a llevar a cabo en la rehabilitación del edificio de “La Fábrica de Tabacos” de la Universidad de Sevilla, es la ejecución de galerías subterráneas para el tendido de las instalaciones necesarias para sus nuevos usos. Para poder realizar estas galerías se necesita conocer las dimensiones y tipología de las cimentaciones del edificio, lo que nos podría desvelar la posibilidad de existencia de restos arqueológicos en el subsuelo. El objetivo del presente trabajo persigue, tanto a través del estudio de la historia del edificio como mediante prospecciones, conocer la tipología de sus cimentaciones para determinar las posibilidades físicas de ejecutar dichas galerías, y para deducir de ello la posible existencia de restos arqueológicos que pudieran afectar a las futuras obras a desarrollar por la Universidad de Sevilla. De todo ello se deduce que el edificio se asienta sobre un terreno antiguamente deprimido, que fue adem

  13. "Hospital Universitàri Vall d'Hebron" edificio de 50 años de antigüedad ¿puede ser sostenible?

    OpenAIRE

    Soler López, Esther

    2012-01-01

    El objeto del proyecto es valorar, definir y proponer, el compromiso y la trayectoria sobre sostenibilidad medioambiental que tiene el “Hospital Universitari Vall d’Hebron” de Barcelona. Como herramienta de valoración se ha utilizado la certificación BREEAM ES Salud, por considerarse un elemento lo suficientemente extenso y comprometido en el tema se sostenibilidad de un edificio hospitalario en uso. BREEAM ES Salud, estudia diez categorías a las que otorga una puntuación se...

  14. Plan de Autoprotección del Edificio B8 del Parque Científico y Tecnológico de Gipuzkoa

    OpenAIRE

    Alonso-Etxarri, Alexander

    2015-01-01

    El presente trabajo tiene como objetivo la elaboración de un Plan de Autoprotección para uno de los edificios del Parque Científico y Tecnológico de Gipuzkoa. Se entiende como autoprotección el sistema de acciones y medidas encaminadas a prevenir y controlar los riesgos sobre las personas y los bienes, a dar respuesta adecuada a las posibles situaciones de emergencia y a garantizar la integración de estas actuaciones en el sistema público de protección civil. Por tanto, una vez descrito el ed...

  15. Valoración de riesgos inducidos por la construcción de nuevos edificios en el campus de la Universidad de Deusto. España

    OpenAIRE

    Saiz de Omeñaca, Jesús; Edeño, Iñaki; Saiz de Omeñaca, José Antonio

    1990-01-01

    El estudio de la morfología de una cuenca adyacente a los terrenos donde se proyectaba construir un gran edificio, reveló que éste y otras construcciones podrían resultar seriamente dañadas a causa de avenidas violentas. Para valorar tal riesgo, se calculó la cantidad de agua que en caso de precipitaciones extraordinarias caería en la cuenca, la permeabilidad de la misma, las posibilidades de retención por la vegetación, los suelos y los recubrimientos geológicos y diversos factores capaces d...

  16. Propuesta de mejora de la productividad en la construcción de edificio multifamiliar mediante la aplicación de cartas balance

    OpenAIRE

    Retuerto Pariamachi, Hugo; Retuerto Pariamachi, Hugo; Retuerto Pariamachi, Hugo

    2015-01-01

    En la actualidad se vienen ejecutando muchos proyectos de construcción en el Perú, siendo la mayor preocupación del constructor obtener la mayor rentabilidad posible. Dicha rentabilidad depende de muchos factores siendo uno de los más importantes la productividad obtenida durante el desarrollo del proyecto. Dado esto, el tema de la presente tesis se refiere al análisis y una propuesta de mejora de la productividad en la construcción de un edificio multifamiliar mediante la aplicación de carta...

  17. Ladrillos de edificios históricos de Toledo: caracterización, origen de las materias primas y aplicaciones para su conservación y restauración

    OpenAIRE

    López-Arce Martínez, Paula

    2004-01-01

    El objetivo principal de esta investigación es determinar las características estéticas (color y dimensiones), composicionales (mineralógica y temperatura de cocción original) y tecnológicas (propiedades físicas, hídricas y mecánicas) de ladrillos pertenecientes a edificios históricos de la ciudad de Toledo. El estudio se ha orientado hacia la selección de rutinas de caracterización más apropiadas para la restauración de edificios históricos. El conjunto de conocimientos obtenidos durante ...

  18. Metodología de diagnóstico de humedades de capilaridad ascendente y condensación higroscópica, en edificios históricos

    OpenAIRE

    García Morales, Soledad

    2012-01-01

    El presente trabajo de investigación propone un método de diagnóstico para las humedades que se suelen conocer como "humedades de capilaridad ascendente". Cuando este problema afecta a edificios de cierta antigüedad (los que se denominan de aquí en adelante "edificios históricos*), es frecuente que las soluciones constructivas que se adoptan en los proyectos de rehabilitación o restauración, no suelan producir los efectos deseados, ante la perplejidad de los técnicos. La razón de este hecho s...

  19. Videojuego con Realidad Virtual

    OpenAIRE

    González Mora, César

    2017-01-01

    El objetivo del proyecto es el desarrollo de un videojuego deportivo que utilice realidad mixta. El videojuego se podrá utilizar con dispositivos de tipo cardboard, y utilizará realidad aumentada para la interacción del jugador con el videojuego. En el desarrollo se utilizará el motor Unity para conseguir una aplicación multiplataforma, y la librería Vuforia para implementar realidad mixta.

  20. Sistemas integrados con Arduino

    OpenAIRE

    EL YAKOUTI, MOHAMMED

    2017-01-01

    Design of a robot prototype remotely controllable from Bluetooth using Arduino. Control and testing of sensors and events interacting with Arduino and Bluetooth. Diseño de un prototipo de robot controlable remotamente con Bluetooth utilizando Arduino. Control y verificación de los sensores y eventos que interactúan mediante el Arduino y el Bluetooth. El Yakouti, M. (2017). Sistemas integrados con Arduino. http://hdl.handle.net/10251/89274. TFGM

  1. Analisis comparativo de una metaheuristica en base a algoritmo genetico vs un metodo de ramificacion y corte para un caso de entrega y recolección con restricciones de ventana de horario

    Directory of Open Access Journals (Sweden)

    Lopez, F.

    2004-07-01

    Full Text Available En la solución de problemas combinatorios, es importante evaluar el costo-beneficio entre la obtención de soluciones de alta calidad en detrimento de los recursos computacionales requeridos. El problema planteado es para el ruteo de un vehículo con entrega y recolección de producto y con restricciones de ventana de horario. En la práctica, dicho problema requiere ser atendido con instancias de gran escala (nodos ≥100. Existe un fuerte porcentaje de ventanas de horario activas (≥90% y con factores de amplitud ≥75%. El problema es NP-hard y por tal motivo la aplicación de un método de solución exacta para resolverlo en la práctica, está limitado por el tiempo requerido para la actividad de ruteo. Se propone un algoritmo genético especializado, el cual ofrece soluciones de buena calidad (% de optimalidad aceptables y en tiempos de ejecución computacional que hacen útil su aplicación en la práctica de la logística. Para comprobar la eficacia de la propuesta algorítmica se desarrolla un diseño experimental el cual hará uso de las soluciones óptimas obtenidas mediante un algoritmo de ramificación y corte sin límite de tiempo. Los resultados son favorables.

  2. Investigando con personas con dificultades de aprendizaje

    Directory of Open Access Journals (Sweden)

    Borja González Luna

    2013-12-01

    Full Text Available El artículo muestra los orígenes de lo que Walmsley (2008 denomina «investigación inclusiva». Para comprender qué se entiende por investigación inclusiva tenemos que remontarnos a los debates epistemológicos sobre las metodologías cuantitativas y cualitativas, acontecidos en la década de los 90, en torno a la revista Disability & Society. A partir de una síntesis de dichos debates, focalizados en el ámbito de la «discapacidad intelectual y del desarrollo», se exponen dos estrategias de colaboración con dicha población: a una aproximación etnográfica (de trabajo grupal, y b una aproximación biográfica (de trabajo individual. A continuación se esboza un posible diseño de trabajo de campo que intenta superar el paradigma cualitativo «clásico» con el objetivo de incluir a dicho colectivo más allá del rol de «sujetos de la investigación». Para finalizar se recoge el debate sobre la accesibilidad de los resultados de la investigación a los participantes en dichas investigaciones, y con ello la necesaria innovación en el ámbito de las «devoluciones» de los resultados, cuando se trata de incluir a personas que presentan limitaciones para la comprensión del lenguaje abstracto oral y/o escrito.

  3. Rogelio Salmona y la arquitectura con ladrillo en Colombia

    Directory of Open Access Journals (Sweden)

    Adell, Josep Mª

    2005-02-01

    Full Text Available The oeuvre of Colombian Rogelio Salmona borrows heavily from European culture while developing the potential of the high quality brick manufactured in his country.
    Salmona exhibits a masterful command of the use of brick in all possible spatial arrangements -walls, floors and ceilingsalways articulating sound constructional compositions based on his many long years of experience with this ceramic material.
    The two pieces (jamb-type and dripstone-type specially designed by the architect for his buildings are used to create multiple finishes that dignify their architectural composition and functionality, with walls that are always at least one foot thick.
    His housing projects such as “Torres del Parque” in Bogotá and public buildings such as the “Home of Colombia’s Distinguished Guests” or the headquarters for the General National Archives have earned him renown as one of Latin America’s most outstanding architects, as well as any number of honours and distinctions.

    La obra del colombiano Rogelio Salmona, se fundamenta en la cultura europea, y desarrolla las posibilidades del ladrillo de calidad que se fabrica en su país.
    El Arquitecto emplea el ladrillo con maestría en todas las disposiciones espaciales posibles, paredes, suelos y techos, articulando, en todos los casos, sabias composiciones constructivas, surgidas de su propia experiencia y evolución a lo largo de los años con este material cerámico.
    Para rematar adecuadamente sus edificaciones, privadas y públicas, Salmona ha diseñado dos piezas especiales (tipo jamba y tipo vierteaguas con las que obtiene múltiples acabados que dignifican su composición y funcionalidad arquitectónica, utilizando siempre como mínimo, muros de 1 pie de grueso.
    Sus obras de viviendas como las Torres del Parque en Bogotá y los edificios públicos como la Casa de Huéspedes Ilustres de Colombia, o el Archivo General de la Nación, han merecido calificar a este

  4. Diseno e Implementación de un Sistema Automatizado para Control Remoto de Iluminación en Conformidad de la Tecnología INSTEON y Optimización del Sistema de Seguridad CCTV en el Edificio GIMPROMED

    Directory of Open Access Journals (Sweden)

    Ronald Moreno

    2012-11-01

    Full Text Available El presente documento describe la implementación de un sistema automatizado y la optimización del sistema de seguridad CCTV (circuito cerrado de televisión para el edificio GIMPROMED. El sistema estará basado en la tecnología INSTEON y se orientara principalmente al control remoto de iluminación, y del equipo de climatización (aire acondicionado. La monitorización, supervisión y control del sistema se realizará a través de un software propietario desarrollado en lenguaje de programación de alto nivel JAVA, con un diseño personalizado y en base a los requerimientos del usuario. Los dispositivos del sistema automatizado serán seleccionados tomando en cuenta los tipos de cargas a controlar, el espacio físico disponible y la distribución de circuitos eléctricos. La optimización del circuito cerrado de televisión traerá consigo la implementación de un sistema flexible que permite integrar los dispositivos analógicos con las nuevas tecnologías existentes a fin de ofrecer una solución eficiente, robusta y flexible. En suma, este sistema, coadyuvará al desarrollo integral de la empresa, y proporcionara un ambiente productivo y eficiente a través de la automatización con el fin de brindar seguridad y respaldo a las personas que trabajan en ella.

  5. IMPLEMENTACIÓN Y CONFIGURACIÓN DE UN ENRUTADOR PARA LA INTERCONEXIÓN DE LA RED DE TECNOLOGÍA AVANZADA RITA-UD CON LA RED METROPOLITANA RUMBO MEDIANTE SOFTWARE LIBRE Y EL MODELO TMN DE LA UIT-T

    Directory of Open Access Journals (Sweden)

    Carlos Andrés Martínez

    2012-05-01

    Full Text Available En este documento se consignan los resultados más relevantes que se obtuvieron al implementar un enrutador  para la interconexión de una red LAN académica con el nodo de RUMBO, sobre una máquina de mediano rendimiento, usando software libre y empleando una adaptación del modelo TMN de la UIT-T para la gestión de este elemento de red. Se aprovechó  las ventajas dinámicas en la implementación de dispositivos de red que ofrece el software libre; obteniendo un enrutador de bajo coste; que soporta enrutamiento estático y dinámico, políticas de calidad de servicio QoS, la nueva generación de direccionamiento IPv6, entre otras.

  6. Aplicación de flujos de cargas sucesivos con jacobiana constante para la determinación del punto de colapso de tensión. Validación con patrón IEEE-14; Aplication of sucessive power flows with constant jacobian to obtain the point of voltage collapse. Test

    Directory of Open Access Journals (Sweden)

    Zaid García Sánchez

    2011-06-01

    Full Text Available Este trabajo presenta un método de solución para el análisis estático de las inestabilidades de tensión. El principal aporte del trabajo es la obtención de la región inestable de la curva P-V utilizando flujos sucesivos basados en un método Newton con jacobiana constante que mantiene los lazos de acoplamiento P-V y Q-δ. El algoritmo se implementó en el paquete de programas PSX, se modela la carga dependiente del voltaje, los límites de potencia activa y reactiva de las máquinas y la variación de la generación de potencia activa de los nodos P-V teniendo en cuenta la reserva de cada máquina que participa en la variación de generación. Se comparan los resultados con un flujo continuado implementado en el software PSAT para el patrón de 14 nodos de la IEEE. Para ambos casos se obtienen resultados muy similares, comprobándose así la exactitud obtenida con la técnica implementada.   This paper presents a solution method for tension instability static analyses. The main contribution of this research is the determinations of the unstable part of P-V curve using a multiple power flow based on the Newton method with constant Jacobian that keeps the links between P-V y Q-δ. This algorithm was implemented within PSX program, the load is modeled as voltage dependent and the limits of active and reactive power of the machines, plus the variation of P-V node generation, taking into account the reserve in each node. The result are compared with a continuation power flow implemented in PSAT software for a grid of 14 nodes patron. In both cases the result are very similar verifying the exactitude of the program developed.

  7. Aplicación de flujos de cargas sucesivos con jacobiana constante para la determinación del punto de colapso de tensión. Validación con patrón IEEE-14;Aplication of sucessive power flows with constant jacobian to obtain the point of voltage collapse. Test with IEEE-14 bus

    Directory of Open Access Journals (Sweden)

    Zaid García - Sánchez, et al.

    2011-06-01

    Full Text Available Este trabajo presenta un método de solución para el análisis estático de las inestabilidades de tensión. El principal aporte del trabajo es la obtención de la región inestable de la curva P-V utilizando flujos sucesivos basados en un método Newton con jacobiana constante que mantiene los lazos de acoplamiento P-V y Q-δ. El algoritmo se implementó en el paquete de programas PSX, se modela la carga dependiente del voltaje, los límites de potencia activa y reactiva de las máquinas y la variación de la generación de potencia activa de los nodos P-V teniendo en cuenta la reserva de cada máquina que participa en la variación de generación. Se comparan los resultados con un flujo continuado implementado en el software PSAT para el patrón de 14 nodos de la IEEE. Para ambos casos se obtienen resultados muy similares, comprobándose así la exactitud obtenida con la técnica implementadaThis paper presents a solution method for tension instability static analyses. The main contribution of this research is the determinations of the unstable part of P-V curve using a multiple power flow based on the Newton method with constant Jacobian that keeps the links between P-V y Q-δ. This algorithm was implemented within PSX program, the load is modeled as voltage dependent and the limits of active and reactive power of the machines, plus the variation of P-V node generation, taking into account the reserve in each node. The result are compared with a continuation power flow implemented in PSAT software for a grid of 14 nodes patron. In both cases the result are very similar verifying the exactitude of the program developed.

  8. Análisis estático - dinámico y diseño sismoresistente de un pórtico de concreto armado con muro de corte

    OpenAIRE

    Torres Limache, Paula Cristina; Torres Limache, Paula Cristina; Torres Limache, Paula Cristina

    1997-01-01

    El trabajo de ingeniería denominado “Análisis Estático -Dinámico y Diseño Sismo-Resistente de un Pórtico de Concreto Armado con Muro de Corte” presenta el análisis estático, dinámico y diseño de los principales elementos conformantes de un pórtico de concreto armado con muro de corte de un edificio de 6 pisos diseñado para el uso de oficinas. Se ha realizado con la finalidad de esclarecer y estudiar conceptos de estructuración y diseño de los elementos : columnas. vigas, placas y cimentaci...

  9. Giochiamo con i robot

    Directory of Open Access Journals (Sweden)

    Andrea Bonarini

    2009-01-01

    Full Text Available "Giochiamo con i robot" e' un laboratorio interattivo per grandi e piccini realizzato per l'edizione 2007 del Festival della Scienza di Genova. Lungo un percorso che va dalla telerobotica alla robotica evolutiva, il laboratorio sviluppa il tema di dare intelligenza ai robot. Questo percorso, le cui tappe sono le varie installazioni, si conclude nella "bottega" dove e' possibile costruire e programmare i propri robot o smontare e modificare quelli esposti durante il percorso didattico. I visitatori sono coinvolti in attivita' ludiche grazie alle quali possonoentrare in contatto con alcune delle idee potenti della robotica,

  10. disegnare con ... Alberto Pratelli

    Directory of Open Access Journals (Sweden)

    Roberto Mingucci

    2017-12-01

    Full Text Available Con questa breve intervista ad Alberto Pratelli, (non a caso scelto per aprire questa nuova rubrica intendia-mo inaugurare un dialogo con personalità significati-ve del Disegno di Architettura, che consenta riflessioni dedicate alle sue varie dimensioni, oggi più che mai da approfondire. La suggestione a farlo, viene da un’idea di Pablo Rodri-guez Navarro ed abbiamo quindi pensato di avviarla proprio in questo numero, che Pablo ha accettato di curare su un tema a lui particolarmente caro.

  11. Un estudio de caso: Rehabilitación singular de edificios de viviendas en la barriada del Parque Alcosa, análisis de daños constructivos comunes y propuesta de intervención

    Directory of Open Access Journals (Sweden)

    Cano-Marín, R. D.

    2014-06-01

    Full Text Available The Parque Alcosa district is located in northwestern area of Seville. It consists of 10,640 public housing development, that was promoted throughout the years 69-72 by the builder Alfredo Corral. There are three different building types which correspond to the different building stages. This article focuses on the the first one, which includes the streets, Ciudad de Jativa, Gandía, Sueca, Onteniente, Carcagente, Burjasot, Godella, Alfafar, Buñol, Paterna y Oliva. The present paper provides a constructive analisys of common building pathologies in phase 1 of Parque Alcosa, related to the potentially expansive features of the land where it is located. This paper also describes the structural sollutions for the projected intervention designed by the architect who subscribes, and was supported by the Public Land Company of Andalusia, under the Singular Building Rehabilitation program.La barriada del Parque Alcosa se localiza en el noroeste del núcleo urbano de Sevilla, y está formada por un conjunto de 10.640 viviendas de promoción pública construida durante los años 69-72 por el constructor valenciano Alfredo Corral. Existen tres modelos de edificación diferentes que responden a fases de construcción, siendo objeto de estudio en este artículo la correspondiente a la primera fase, comprendidas por las calles Ciudad de Játiva, Gandía, Sueca, Onteniente, Carcagente, Burjasot, Godella, Alfafar, Buñol, Paterna y Oliva. El presente trabajo expone el análisis de las patologías constructivas comunes existentes en la fase 1 del Parque Alcosa, relacionadas con el carácter potencialmente expansivo de los terrenos donde se ubica. Así mismo se desarrollan las soluciones constructivas de la intervención proyectada, llevado a cabo mediante el programa de Rehabilitación Singular de Edificios de la Empresa Pública del Suelo de Andalucía.

  12. Evaluación, diseño y propuestas de sistemas de ventilación en la rehabilitación de edificios residenciales españoles. Estudio de caso

    Directory of Open Access Journals (Sweden)

    Meiss, A.

    2016-06-01

    Full Text Available In recent years, building retrofitting has grown in importance, due to the need to improve construction and energy conditions, but omitting those relating to ventilation. This is due to the difficulty to estimate the available natural ventilation and the limited solutions derived from DB-HS3. This work aims to present a methodology, through numeric simulations and climate data, able to solve the seasonal pressure gradient in the building’ envelope and, once known the airtightness with on-site pressurization tests, the calculation of the ventilation flows in three representative conditions (summer, winter an annual average. To fulfill the HS3 requirement is advisable to use the performance-based nature of CTE, which allows other alternative solutions to the DB. But it is necessary to introduce changes in the regulations to allow the proposed solution of an individual ventilation system with variable flow or Controlled Cross Ventilation.En los últimos años, la rehabilitación de edificios ha experimentado un gran impulso, haciendo hincapié en aspectos constructivos y energéticos, pero omitiendo los relativos a la ventilación. Esto se debe a la dificultad de conocer la ventilación natural disponible y en las escasas soluciones derivadas del DB-HS3. Este trabajo pretende exponer una metodología para, a partir de simulaciones numéricas y datos climáticos, obtener el gradiente estacional de presiones en los cerramientos y, conocida su permeabilidad mediante ensayos de presurización in situ, obtener los caudales disponibles en tres períodos del año (verano, invierno y media anual. Para el cumplimiento de la exigencia HS3 es recomendable acudir al carácter prestacional del CTE, que admite otras soluciones alternativas al Documento Básico, pero es necesario introducir una serie de cambios para la solución propuesta de proyectar un sistema individual de ventilación con caudal variable o Ventilación Cruzada Controlada.

  13. Análisis de ciclo de vida de una nueva solución arquitectónica que mejora el rendimiento térmico de la envolvente del edificio: Fachada Natural Aljibe

    Directory of Open Access Journals (Sweden)

    Carabaño, R.

    2014-09-01

    Full Text Available The objective of this work, that improves the enclosure’s thermal performance of the building, is to divulge the environmental impacts tied to a new solution of vegetated façade by means of the Life Cycle Assessment methodology with a cradle to grave system boundary. The analysis aims also at generating relevant information of the life cycle as base material for drafting a future Environmental Product Declaration. The façade’s component manufacture stage is the one presenting the highest contribution for all the analysed impact categories, with the vegetated layer being the one with the greatest impact. Conversely, the transport stage is the one presenting the least contribution, and can be considered negligible for all the analysed impact categories. Following the analysis of the results, we have obtained useful information about the most problematic aspects and components in the assessed façade’s performance, thus paving the way towards possible actions of impact reduction by the manufacturer.El objetivo de este trabajo, que supone la mejora del rendimiento térmico de la envolvente del edificio, es dar a conocer los impactos ambientales asociados a una nueva solución de fachada vegetada mediante la metodología de Análisis de Ciclo de Vida con límites del sistema de la cuna a la tumba. El análisis pretende también generar información relevante de ciclo de vida como material de partida para la redacción de una futura Declaración Ambiental de Producto. La etapa de fabricación de los componentes de la fachada es la que más contribución presenta en todas las categorías de impacto analizadas, siendo la capa vegetada la de mayor impacto. En cambio, la etapa de transporte es la que presenta menor contribución, pudiendo ser considerado despreciable para todas las categorías de impacto analizadas. Tras el análisis de los resultados, se ha obtenido información útil de los aspectos y componentes más problemáticos en el

  14. Proyecto de edificio singular

    OpenAIRE

    Benavides Brasil, Álvaro

    2014-01-01

    Este trabajo tiene como objetivo fundamental el diseño de una nave para su uso como matadero de ganado bovino, atendiendo al cálculo simplificado de su estructura, así como el análisis y resolución de las instalaciones necesarias para el desarrollo de la actividad: aire comprimido, calefacción, saneamiento, fontanería y especialmente, de las cámaras frigoríficas para la conservación de la carne. Analizando las necesidades de espacio en función de las características del luga...

  15. Estudio sísmico de los edificios agregados de obra de fábrica utilizando el método del espectro de capacidad

    Directory of Open Access Journals (Sweden)

    Moreno-González, R.

    2014-03-01

    Full Text Available In this work a study about the seismic behaviour of a set of masonry aggregates buildings located in the city of Barcelona, Spain, is presented. Considering the age of these buildings (more than 70 years two mechanical properties for the masonry were defined. The seismic action considered is defined by elastic response spectrum defined by Eurocode 8 for the seismic acceleration of Barcelona. To analyze these buildings the capacity spectrum method was used, from which the capacity curve and the fragility curves are obtained for evaluating the seismic expected damage. Damage probability matrices quantified the seismic damage and they are obtained from the fragility curves and the performance point. Considering that the city of Barcelona is located in an area of low seismicity, the results show an important seismic damage.Se presenta un estudio sobre el comportamiento sísmico de un conjunto de edificios agregados de obra de fábrica situados en la ciudad de Barcelona, España. Considerando la edad que tienen estos edificios (más de 70 años se definen dos propiedades mecánicas para la mampostería. La acción sísmica considerada se define a partir del espectro elástico de respuesta definido en el Eurocódigo 8 para la aceleración sísmica de Barcelona. Para analizar los edificios se utiliza el método del espectro de capacidad, a partir del cual se obtienen la curva de capacidad y las curvas de fragilidad para evaluar el daño sísmico esperado. Las matrices de probabilidad de daño cuantifican el daño sísmico y se obtienen a partir de las curvas de fragilidad y el punto de capacidad por demanda. Teniendo en cuenta que Barcelona se encuentra en una zona de baja sismicidad, los resultados obtenidos muestran un daño sísmico importante.

  16. Instalación domótica sobre un proyecto ICT para un edificio de viviendas residenciales

    OpenAIRE

    Martínez Tàrraga, Alex

    2007-01-01

    La finalidad de este proyecto consiste en diseñar e implementar una instalación domótica a partir de un proyecto ICT ya realizado, en un conjunto residencial de viviendas ya construidas. El factor principal de este proyecto es mejorar el nivel de vida del usuario final, otorgándole un mayor confort dentro de su hogar, para realizar este propósito se ha diseñado una instalación con las funciones – dispositivos necesarios con capacidad de procesar audio y vídeo, comunicarse vía Internet, tel...

  17. Conversando con Oriol Bohigas

    OpenAIRE

    Redondo Domínguez, Ernesto; Moya Sala, Joaquim

    2015-01-01

    [EN] Interview with Oriol Bohigas [ES] Entrevista con Oriol Bohigas Redondo Domínguez, E.; Moya Sala, J. (2015). Conversando con… Oriol Bohigas. EGA. Revista de Expresión Gráfica Arquitectónica. 20(26):22-35. doi:10.4995/ega.2015.4061 22 35 20 26

  18. DR Con o:

    African Journals Online (AJOL)

    which could fall under the Ugandan influence. The con-. flict in the ..... The Congolese people and international community within SADC, the AU ..... ments and make peace among themselves. However, one ... friends overnight.There is a great ...

  19. Flujo de carga con armónicos empleando la matriz impedancia de barras

    Directory of Open Access Journals (Sweden)

    José A González Quintero

    2011-03-01

    Full Text Available Se describe un flujo de armónicos empleando la matriz impedancia de barras. El algoritmo propuesto permite hallar losvoltajes de cada nodo del circuito sin tener que realizar la solución simultánea de todas las ecuaciones no linealescorrespondientes a cada nodo, ni siquiera la solución simultánea de las ecuaciones correspondientes a una redreducida de nodos no lineales solamente.  This work describes a harmonic load flow using the bar impedance matrix. The proposed algorithm permit to findevery node voltage of the circuit without to realize the simultaneous solution of all the non-linear equationscorresponding to each node, not even the simultaneous solution of the equations corresponding to a reducednetwork of only non-linear nodes.

  20. O efeito da morfina na inibição vagal do coração: demonstração da dupla via do nodo atrioventricular - DOI: 10.4025/actascihealthsci.v28i2.1102 The effect of morphine on vagal inhibition of the heart: demonstration of dual atrioventricular nodal pathways - DOI: 10.4025/actascihealthsci.v28i2.1102

    Directory of Open Access Journals (Sweden)

    José Geraldo Pereira da Cruz

    2006-03-01

    Full Text Available A estimulação elétrica do nervo vago diminui a freqüência cardíaca e aumenta o intervalo PQ no eletrocardiograma, podendo ativar a via anterógrada do nodo atrioventricular. Neste experimento é investigada a interação da morfina sobre o controle nervoso parassimpático cardíaco em relação à dupla condução do nodo atrioventricular. A estimulação do nervo vago induz uma significativa bradicardia e um bloqueio atrioventricular de terceiro grau, com a onda P aparecendo negativa na derivação II. Devido aos efeitos moduladores da anestesia sobre o coração, administração de injeções de morfina induz o aparecimento de onda P positiva através de uma ação inibitória sobre a reentrância do nodo atrioventricular. Tudo sugere a presença de duas vias atrioventriculares, anatômica e funcionalmente distintasThat electrical stimulation of the vagus decreased heart rate and increased the PQ interval in electrocardiogram, consistent with anterograde dual atriventricular conduction. The present experiments were investigating the interaction of the morphine with cardiac parasympathetic nervous control in dual atrioventricular node. Electrical stimulation of the vagus nerve induced significant bradycardia and of third degree atrioventricular block and the P wave appearance was negative in leads II. Because background anesthesia modulates the heart, administered morphine injection the P waves appearance was positive through one inhibitory action on atrioventricular nodal reentry. All suggest the presence of two functionally and anatomically distinct atrioventricular pathways

  1. fertilizada con diferentes abonos

    Directory of Open Access Journals (Sweden)

    Jorge Alberto Elizondo-Salazar

    2007-01-01

    Full Text Available Producción y calidad de la biomasa de morera (Morus alba fertilizada con diferentes abonos. Se llevó a cabo un experimento en la Estación Experimental “Alfredo Volio Mata” de la Universidad de Costa Rica con el fi n de evaluar la aplicación de 150 kg de N/ha/año proveniente de dos abonos orgánicos: lombriabono y compostaje; y de un fertilizante químico, sobre la producción y calidad de la biomasa de morera. El periodo experimental comprendió un ciclo de 12 meses, iniciando en julio del 2003 y fi nalizando en julio del 2004. Se utilizó una plantación de morera de 12 años de establecida con una densidad de siembra de 27.777 plantas/ ha. Se empleó un diseño de bloques completos al azar con cuatro tratamientos: dos abonos orgánicos, nitrato de amonio (33,5% N y un control. Las plantas se podaron a 0,6 m sobre el nivel del suelo al inicio del ensayo. Durante el periodo experimental, las plantas fueron podadas consecutivamente cada 90 días. Las hojas y los tallos fueron separados y analizados para determinar el contenido de materia seca y proteína cruda. La producción de materia seca fue 23% superior y el contenido de proteína cruda fue signifi cativamente mayor con el nitrógeno químico, mientras que el contenido de materia seca fue menor. No se encontraron diferencias signifi cativas entre el tratamiento control y los tratamientos orgánicos.

  2. Edificios inteligentes y sostenibles: arquitectura de percepción y control para la gestión de energía

    OpenAIRE

    Hernández Uribe, Óscar

    2016-01-01

    El sector de los edificios consume entre el 30% y el 40% de la energía mundial. En el caso de la Unión Europea, para satisfacer las necesidades del usuario, del total de energía usado en este tipo de instalaciones el consumo térmico representa más del 60%. Por otro lado, el cambio climático, la explosión demográfica, el incremento de la esperanza de vida, y la predicción de que dentro de un par de décadas el 80% de la población se concentrará en ciudades, son factores que exigen un nuevo para...

  3. pacientes con falla cardiaca

    Directory of Open Access Journals (Sweden)

    Diana Marcela Achury Saldaña

    2007-01-01

    Full Text Available Objetivo: determinar la adherencia al tratamiento de pacientes con falla cardiaca hospitalizados, al aplicar un plan educativo quefomenta el autocuidado.Método: estudio cuasiexperimental (entrevistas enfermera-paciente realizado entre diciembre de 2004 y mayo de 2006, con unamuestra de 50 pacientes seleccionados por conveniencia. Se diseñó un instrumento para evaluar los comportamientos de los pacientes,con base en algunos resultados de la adherencia y sus respectivos indicadores de la taxonomía NOC (Nursing out comes classification. Laadherencia al tratamiento fue medida en dos momentos: el primero durante la hospitalización, seguido de la aplicación del plan educativoantes del alta, que proporcionaba información en el manejo de su enfermedad desde una dimensión física, psicológica y social quepromueve el autocuidado; y el segundo un mes después del alta en su domicilio.Resultados: diferencias estadísticamente significativas (P=0,0001 que demuestran cómo mediante la capacitación al paciente enel manejo de su tratamiento farmacológico y no farmacológico, el establecimiento de una sana relación entre el profesional de enfermeríay el paciente, y la participación de la familia, se logra una total adherencia al tratamiento.Conclusiones: para lograr una adherencia total del paciente con falla cardiaca al tratamiento es necesario un proceso educativo y unseguimiento continuo y personalizado que motive permanentemente al paciente y se le reconozca el papel protagónico en su cuidado y manejo de la enfermedad.

  4. Muelle y edificio de servicios en el puerto de Alicante, España (1997-1998-2000

    Directory of Open Access Journals (Sweden)

    García-Solera, Juan A.

    2004-02-01

    Full Text Available The competition consisted in designing a quay for thedisembarkation of local passengers and a building housing akiosk and shaded waiting area on top of it. This was asplendid opportunity for exploring the two extremes ofconstruction most closely linked to the sea: the building of adike and platform using civil engineering techniques inaddition to a small building made with the quality ofmaterials, fit and precision characteristic of the best navalarchitecture. Construction of the quay started with largeblocks of concrete and stone, earth moving and underwateranchoring. It then continue above water, as if it were a boat indry dock, with wood and metal, assembling, fitting together,tightening screws...It was proposed to design and asymmetric quay that wouldlook in a specific direction so that the boats would notobstruct the views from the building. The height of thebuilding was kept to a minimun seeking the predominanthorizontality of any view of a port. The building resolutelyraises its own verticality competing masts of the sailboatslining the dock to greet those who arrive at the citty,The building is intend ed to have an ambiguous relationshipwith the sea. The metal balcony, lack of handrails, lightness,lack of definition between inside and outside and between thesea and land all contribute to creating such a relationship.El concurso consistía en el diseño de un muelle para eldesembarque de viajeros de cercanías y, sobre él, unaedificación que albergase un quiosco y sombra de espera.Una oportunidad espléndida para explorar los dos extremosde la construcción más ligada a la mar: la ejecución deldique y su plataforma con técnicas de ingeniería civil y la deuna pequeña construcción realizada con la calidad material,el ajuste y la precisión propias de la mejor arquitecturanaval. Se construye primero con grandes masas de hormigóny piedra, con movimientos de tierras, con fondeossubmarinos. Se construye después en seco, como si de

  5. Cementos con cenizas volantes

    Directory of Open Access Journals (Sweden)

    Ossa M., Mauricio

    1984-03-01

    additions of 20 and 30% .

    Casi la generalidad de los estudios realizados sobre cementos con adición de cenizas volantes se refieren a sus características y comportamiento en pastas, morteros y hormigones, siempre en relación con aquéllos del cemento portland. Esta vez, se desarrolló un trabajo experimental orientado a relacionar entre sí los cementos con adiciones de cenizas volantes y de puzolana natural. Para ello se fabricaron a escala de laboratorio cementos de ambos tipos, empleando como materias primas comunes clinker y yeso y, como variables, diferentes porcentajes de las dos adiciones, que cumplieron previamente los requisitos normalizados en cuanto a sus actividades puzolánicas. La calidad de los cementos fabricados resultó adecuada y concordante con la del cemento portland-puzolánico obtenido a escala industrial con los mismos clinker, yeso y puzolana natural de este estudio. Posteriormente, se determinaron las características de los cementos experimentales y se confeccionaron morteros normales para la realización de ensayos físicos y mecánicos. Los resultados de ensayos indicaron que los cementos con adición de cenizas volantes (CCV requieren menos agua para consistencia normal, presentan tiempos de fraguado mayores y expansiones en autoclave menores que los cementos con adición de puzolana (CP. Los calores de hidratación a 7 y 28 días de edad fueron aproximadamente similares para ambos tipos de cemento. En morteros normales, los cementos CCV mostraron menor retracción de secado, mayor retentividad y mayor fluidez (para igual cantidad de agua que los cementos CP. En los ensayos de exudación se observó que ésta depende más de la finura que el tipo de adición. Finalmente, los ensayos mecánicos señalaron que las resistencias a compresión y flexotracción de los morteros con cementos CCV son menores a edades inferiores que 14 días (del orden de 5 a 10% a un día de edad, pero que a partir de entonces pasan a ser mayores que las de

  6. competencia con China

    Directory of Open Access Journals (Sweden)

    Elena de la Paz Hernández Águila

    2007-01-01

    Full Text Available El artículo ofrece un diagnóstico del desempeño de la industria mexicana del calzado desde la década de los ochenta hasta la actualidad. Analiza la problemática que ha enfrentado esta rama industrial a partir del proceso de apertura comercial y de la competencia en su mercado interno con productos provenientes de países asiáticos, particularmente China. Problematiza al respecto los retos y las perspectivas que a mediano plazo enfrentará este sector empresarial y sobre las posibilidades de competir en el mercado globalizado.

  7. Construir con Madera

    OpenAIRE

    Olabe-Velasco, F. (Fermín); Val-Hernández, Y. (Yolanda); Varela-de-la-Cruz, P. (Perla); Cabrero-Ballarín, J.M. (José Manuel)

    2010-01-01

    Guía divulgativa ‘Construir con madera’, elaborada por la Cátedra Madera de la Universidad de Navarra y el Gobierno de Navarra. La publicación pretende explicar de forma sencilla los beneficios y posibilidades de este material en la construcción, tanto en lo que respecta a su resistencia, comportamiento frente al fuego, durabilidad, capacidad de aislamiento, propiedades acústicas, estética, respeto al medio ambiente y sostenibilidad como fuente de energía. A modo de ejemplo, en la ...

  8. Desarrollo de un proyecto ejecutivo de instalaciones de un edificio destinado a centro cívico

    OpenAIRE

    López Monge, María del Mar

    2010-01-01

    Fontanería y ACS. Para realizar el cálculo de caudales y diámetro de tuberías se utiliza el método de cálculo ajustado. Todas las tuberías son de polietileno reticulado. La distribución será por falso techo superficialmente, próxima al techo. Los tramos empotrados son las derivaciones a aparatos de los aseos, camerinos y cocina de la Cafetería. Provisto de dos acumuladores bivalentes con una capacidad de 500 litr. Cada uno. Tiene dos serpentines en su interior uno sirve para co...

  9. Entrevista con Giovanni Levi

    Directory of Open Access Journals (Sweden)

    Monica Oliveira

    2017-06-01

    Full Text Available En esta entrevista, Giovanni Levi - como un conocedor del tema de Familia - realiza una importante evaluación sobre el actual estado de las investigaciones realizadas en el Brasil y em el exterior. Con estilo franco, agudo y lucido critica las visiones tradicionales y sus ilusiones ypropone nuevos conceptos y métodos. La historia de la familia debería ceder espacio para el estudio de las redes relacionales o de los mundos relacionales. De la misma forma, la historia cuantitativa debería abrir espacio para el estudio de las cualidades. Ya con relación a la historia de las elites, tan estudiada y reproducida en una diversidad de trabajos, que deberíase mirar en otra perspectiva. Es decir, no mirar a las reglas sociales predeterminadas, sino a los desvíos y a las variaciones. Levi defiende que los historiadores deben trascender a los documentos que se encuentran fácilmente y que pueden fortalecer perspectivas deformadas y esequilibradas de la sociedad. Para él, los historiadores deben esforzarse por estudiar a aquellos grupos que dejaron pocos rastros documentales. En ese esfuerzo existiría una nueva mirada sobre la historia de la familia.

  10. Entrevista con Patricia Ariza

    Directory of Open Access Journals (Sweden)

    Esperanza Londoño La Rotta

    2017-01-01

    Full Text Available Pensamiento, Palabra y Obra entrevista a una artista, feminista y activista política, quien como mujer y artista ha permitido pensar el arte más allá de un simple espectáculo. Toda una vida dedicada al teatro y a darle voz, a través de sus obras, a víctimas del conflicto colombiano, defensora de derechos humanos; además de hacer evidente en su vida y a través de la plataforma “Artistas por la paz”, las múltiples relaciones que se pueden establecer entre el arte, la construcción de paz y la resolución de conflictos. Hablamos en su casa, en medio del calor de la bienvenida con Patricia Ariza, directora del festival alternativo de teatro, de Mujeres en Escena y de la Corporación Colombiana de Teatro, entre otras muchas actividades que voluntariamente su espíritu libertario ha asumido. Esta entrevista se realizó antes del 2 de octubre, pero con la revisión de los acuerdos que propició el plebiscito ganado por una ínfima minoría por el no, sigue siendo vigente este planteamiento.

  11. Ahorros en los consumos para enfriamiento de espacios interiores mediante la evaluación de sistemas de protección solar en edificios residenciales en altura. El caso de la "ciudad-oasis" de Mendoza, Argentina

    Directory of Open Access Journals (Sweden)

    Julieta Balter

    2016-06-01

    Full Text Available El presente trabajo estudia el comportamiento térmico y energético de edificios residenciales en altura, en el contexto particular de una “ciudad-oasis”. Se plantea como objetivo la definición de sistemas de control solar adecuados en la envolvente para cada tipología material de edificio -másica y liviana- y para cada estrato en altura de las viviendas: debajo y sobre de la copa de los árboles. El monitoreo de viviendas en uso permite validar modelos geométricos (software Energy Plus y simular propuestas de aplicación de elementos de protección solar. Se analizan los ahorros en los consumos para enfriamiento en departamentos en niveles bajos, medios y altos. Los resultados muestran que en el edificio másico, en las viviendas ubicadas debajo de la copa de los árboles, es posible anular las cargas energéticas para enfriamiento mediante el uso de elementos exteriores de protección solar. Mientras que en las viviendas sobre la copa de los árboles, los ahorros energéticos se encuentran entre el 32% y 42%. En el edificio liviano, la aplicación de sistemas de control en departamentos bajo la copa de los árboles alcanza ahorros del orden del 53% y en las viviendas sobre la copa, las reducciones energéticas se encuentran entre el 46% y 54%. Las dimensiones adecuadas de tales elementos pueden generar propuestas posibles de ser transferidas a las normativas locales de edificación. 

  12. Rehabilitación de edificios bajo objetivos de reducción de impacto ambiental: un caso piloto de vivienda plurifamiliar en el área de Playa de Palma, Mallorca

    Directory of Open Access Journals (Sweden)

    Wadel, G.

    2011-10-01

    Full Text Available This article presents briefly the work Pilot study to reduce environmental impact: evaluation and assessment of a sustainable refurbishment of an existing residential building in Playa de Palma carried out by the Consortium of Palma Beach. It will be explained by how the environmental impacts of the building can be reduced by 50% or more as a result of future refurbishment and subsequent management, referring to both its current situation and refurbishment standards in residential buildings. It also includes an approximated evaluation of the CO2 emission reduction achieved in the building life cycle and the projected costs for the various actions of the refurbishment model proposed by the Consortium, to be carried out in other renovation operations in Palma Beach.

    Este artículo resume el estudio Experiencia piloto para la reducción del impacto ambiental: evaluación y asesoramiento a la rehabilitación sostenible de un edificio de viviendas existente en Playa de Palma realizado para el Consorci de Platja de Palma. Se explica a través de qué medidas es posible reducir en un 50% o más los impactos ambientales del edificio como producto de su futura rehabilitación y posterior gestión respecto tanto de su situación actual como de los estándares de rehabilitación al uso en edificios de vivienda. Asimismo, se incluye también una aproximación a las reducciones de emisiones de CO2 que se consiguen en el ciclo de vida del edificio y a los costes previstos para las distintas actuaciones del modelo de rehabilitación que el citado consorcio propone para las operaciones de rehabilitación a llevarse adelante en Playa de Palma.

  13. Síntesis de nanoestructuras de ZnO en vidrio recubierto con In2O3/SnO2 Deposición química en fase gaseosa

    Directory of Open Access Journals (Sweden)

    Alberto Hernández-Valle

    2014-12-01

    Full Text Available En este proyecto se sintetizaron nano- y microestructuras de óxido de zinc en un sustrato transparente de vidrio cubierto con In2O3/ SnO2(ITO por el método de deposición química de vapor. El material depositado exhibe distintas morfologías, incluyendo capa homogénea, nanobarras rectas y curvilíneas, nanopartículas poliformes, nanotetrápodos, microbarras y micropartículas. Los resultados comprueban que el tipo de estructuras de óxido de zinc que se producenson altamente dependientes de la distancia entre el contenedor del polvo de zinc y el sustrato, de la relación molar O:Zn, y del tiempo de síntesis. El material compuesto fabricado tiene gran potencial para ser usado como fotoánodo en celdas solares sensibilizadas con tintes y biomoléculas.

  14. Pilas de combustible de una sola cámara, basadas en electrolitos de ceria dopada con gadolinia y operadas con metano y propano

    Directory of Open Access Journals (Sweden)

    Piñol, S.

    2010-02-01

    Full Text Available The main advantages of single-chamber solid oxide fuel cells (SOFCs respect to dual-chamber SOFCs, are to simplify the device design and to operate in mixtures of hydrocarbon (methane, propane… and air, with no separation between fuel and oxidant. However, this design requires the use of selective electrodes for the fuel oxidation and the oxidant reduction. In this work, electrolyte-supported SOFCs were fabricated using gadolinia doped ceria (GDC as the electrolyte, Ni + GDC as the anode and LSC(La0.5Sr0.5CoO3-δ-GDC-Ag2O as the cathode. The electrical properties of the cell were determined in mixtures of methane + air and propane + air. The influence of temperature, gas composition and total flow rate on the fuel cell performance was investigated. As a result, the power density was strongly increased with increasing temperature, total flow rate and hydrocarbon composition. Under optimized gas compositions and total flow conditions, power densities of 70 and 320 mW/cm2 operating on propane at a temperature of 600ºC and methane (795ºC were obtained, respectively.

    La principal ventaja de las pilas de combustible de óxido sólido (SOFCs de una sola cámara, frente a las bicamerales convencionales, es que permiten simplificar el diseño del dispositivo y operar con mezclas de hidrocarburos (metano, propano... y aire, sin necesidad de separar ambos gases, por medio del uso de electrodos selectivos a la oxidación del combustible y reducción del oxidante. En el presente trabajo, se han fabricado monopilas soportadas sobre electrolitos de ceria dopada con gadolinia (GDC, de 200 µm de espesor, usando Ni-GDC como ánodo y LSC(La0.5Sr0.5CoO3-δ-GDC-Ag2O como cátodo. Las propiedades eléctricas de la celda se determinaron en un reactor de una sola cámara, usando mezclas de metano + aire y propano + aire. Se investigó la influencia de la

  15. Fotogrametría de bajo coste para la modelización de edificios históricos

    Directory of Open Access Journals (Sweden)

    José Luis Pérez García

    2011-04-01

    Full Text Available En los últimos tiempos las metodologías y herramientas utilizadas para el estudio y la documentación del patrimonio histórico han sufrido un importante avance al disponer de un mayor abanico de posibilidades para abordar estas tareas. Sin embargo, algunas de estas nuevas posibilidades, tales como las estaciones fotogramétricas digitales o el sistema láser escáner, si bien facilitan y mejoran de manera importante los trabajos y productos obtenidos, tienen un coste bastante elevado, que en muchos casos no permiten su utilización. En este trabajo se presentan diferentes técnicas fotogramétricas de bajo coste, que permiten obtener productos con precisiones aceptables y muy interesantes para el estudio, la documentación y modelización de documentos históricos.

  16. preescolares desnutridos con madres con obesidad y sin obesidad

    Directory of Open Access Journals (Sweden)

    Viridiana Vanessa Conzuelo-González

    2009-01-01

    Full Text Available El primer objetivo fue conocer cuántos menores de cinco años con diferentes grados de desnutrición tienen una madre con sobrepeso/obesidad/ en una comunidad indígena que vive en extrema pobreza y bajo condiciones de migración masculina internacional. El segundo fue comparar tres variables socionutricionales (ingreso familiar, educación de la madre y adecuación nutrimental de la dieta diaria entre estos hogares y los hogares con desnutrición infantil y madres sin obesidad. Se realizó un estudio transversal (2006-2007, en la comunidad mazahua de San Francisco Tepeolulco, Municipio de Temascalcingo; que incluyó a 85 hogares integrados por preescolares con desnutrición inscritos al programa Oportunidades. Se determinó el estado nutrición de los preescolares con indicadores antropométricos y se obtuvo el IMC de las madres de estos infantes. Se aplicó una encuesta socionutricional, incluida el recordatorio de 24 horas, y complementado con la observación participante (cualitativa. Se encontró que 83% de las madres mazahuas presentaron sobrepeso u obesidad. El estado de nutrición de los preescolares con madres con obesidad presentó un porcentaje mayor de desnutrición (76%. En la variable género, se encontró que 54% de los niños con madres con obesidad tenía baja talla. Al relacionar el nivel educativo de la madre, esta variable resultó ser estadísticamente significativa (p=0.015, donde el analfabetismo está más relacionado con la desnutrición infantil que tienen madres de bajo y/o peso normal. La elevada prevalencia de hogares conformados con preescolares con desnutrición y madres con obesidad, es un síntoma más de la pobreza en zonas indígenas en México, con bajo índice de desarrollo humano.

  17. Apoyo a la selección de emplazamientos óptimos de edificios. Localización de un edificio universitario mediante el Proceso Analítico Jerárquico (AHP

    Directory of Open Access Journals (Sweden)

    Romero, M.

    2010-09-01

    Full Text Available One of these new fields in which the GIS becomes necessary, it is the effective administration and management of urban spaces and buildings, so much from environmental view point, with sustainable development; as from their infrastructures maintenance, generating immediate solutions to urgent problems. In this work we use the AHP, Analytical Hierarchy Process, with GIS data to determine, on different approaches based on different attributes, as is the more appropriate emplacement to build urban equipment. In this case, a library, in the Campus of Montegancedo of the Universidad Politecnica de Madrid, where it is located the Facultad de Informática. The AHP, Analytical Hierarchy Process is a mathematical base tool that allows structuring a multicriterion problem in visual form. The goal tried is to conclude that with the application of this type of decision tools can be obtained a greater fairness and space efficiency in the final result of the decision on the buildings emplacement, at the same time as the possible negative effects are reduced on the environment in a special protection zone.

    Uno de los nuevos campos en el que los SIG son necesarios, es la gestión eficaz de los espacios y equipamientos urbanos, tanto desde el punto de vista medioambiental, respetando la idea de desarrollo sostenible; como del mantenimiento de sus infraestructuras, generando soluciones inmediatas a problemas urgentes. En este trabajo se plantea la utilización de una técnica de decisión multicriterio, el Proceso Analítico Jerárquico (AHP, con datos generados por un SIG para determinar sobre la base de diferentes criterios basados en distintos atributos, cual es el emplazamiento más adecuado para construir equipamientos urbanos. Se ha aplicado para determinar el emplazamiento de una biblioteca en el Campus de Montegancedo de la Universidad Politécnica de Madrid, donde se ubica la Facultad de Informática. El AHP, es una herramienta de base matem

  18. Láser escáner y nubes de puntos. Un horizonte aplicado al análisis arqueológico de edificios

    Directory of Open Access Journals (Sweden)

    García-Gómez, Ismael

    2011-12-01

    Full Text Available This paper analyses the laser scanner, a powerful tool for graphic recording of cultural heritage sites. Although attention will be drawn to those technical and logistical aspects and methods related to its employment, this report will mainly focus on its applicability on Building Archaeology, highlighting those diagnosing capacities which may help the stratigrapher to establish an evolutionary sequence of the building. The basis of this study is our work on San Miguel church in Vitoria-Gasteiz.En el siguiente artículo analizamos uno de los más modernos instrumentos de documentación gráfica del patrimonio, el láser escáner. Aunque profundizaremos en todos aquellos aspectos técnicos, logísticos y de método relativos a su empleo, nos centraremos en su efectiva aplicabilidad dentro del campo de la Arqueología de la Arquitectura, incidiendo en aquellas capacidades diagnósticas que pueden ayudar al estratígrafo a determinar la secuencia evolutiva de un edificio. Tomaremos como base nuestra experiencia en la iglesia de San Miguel de Vitoria-Gasteiz.

  19. 2 obras de Marcel Breuer - U.S.A. : Edificio central para el departamento de edificación y desarrollo – Washington

    Directory of Open Access Journals (Sweden)

    Breuer, Marcel

    1970-10-01

    Full Text Available This building, in horizontal projection, has the form two Y's, joined at the base. It contains the offices of the above Department. It includes a large cafeteria, catering for three to four thousand employees, another smaller one, a library, offices, parking facilities and other services. It has been designed on a modular unit. Its external enclosure consists of prefabricated concrete units, each weighing 12 tons. The partitions are transportable, so that they can be easily relocated in accord with changing requirements, and thus giving the building a large measure of functional adaptability.El edificio, que adopta en planta la forma de dos «Y» unidas por su base, contiene las oficinas del Departamento enunciado. Dispone asimismo de: una gran cafetería que da servicio a los 3.000 o 4,000 empleados; otra más pequeña; biblioteca; dependencias de la administración; aparcamientos; etc. Diseñado modularmente, sus muros exteriores han sido construidos a base de paneles prefabricados, de hormigón visto, de 12 t. Los elementos de compartimentación son desmontables, lo que permite desplazarlos y adaptarlos a futuras distribuciones, imprimiendo una gran flexibilidad de funcionamiento al inmueble.

  20. Energy saving in buildings through the elimination of typical problems; Ahorro de energia electrica en edificios a traves de la eliminacion de problemas tipicos

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Rivero, Alex G [Genertek, S. A. de C. V., Mexico, D. F. (Mexico)

    1994-12-31

    The enormous electric energy consumption in buildings represents an important area of saving opportunities. The design of installations without advanced technical illumination criteria, the absence of standardization over energy efficiency, the lack of observation of the existing standards and guides, the continuous load growth in existing installations and the lack of appropriate maintenance, are some of the causes of the inefficient use of electric energy in buildings. Although the problems, and consequently the solutions, are exclusive for each unit, some of the former are frequently repeated. In this paper the problems found along more than 40 audits conducted in large buildings of different types in Mexico city are commented. [Espanol] El enorme consumo de energia electrica en edificios representa una importante area de oportunidad para ahorro. El diseno de instalaciones sin criterios luminotecnicos avanzados, la ausencia de normalizacion sobre eficiencia energetica, la falta de observancia de las normas y recomendaciones vigentes, el continuo crecimiento de carga en instalaciones existentes y la falta de mantenimiento adecuado son algunas de las causas del uso ineficiente de la energia electrica en inmuebles. Aunque los problemas y por tanto las soluciones son particulares para cada unidad, algunos de los primeros se repiten frecuentemente. En este trabajo se comentan los problemas encontrados a lo largo de mas de 40 auditorias realizadas a inmuebles grandes de diversos tipos en la ciudad de Mexico.

  1. Proyecto de rehabilitación de un edificio subutilizado para generar vivienda en el área central de la ciudad de San José

    Directory of Open Access Journals (Sweden)

    Felipe Pina Castillo

    2016-01-01

    Full Text Available Reseña del proyecto arquitectónico titulado “Rehabilitación de un edificio subutilizado para generar vivienda en el área central de San José”. El tema del proyecto tiene la voluntad de ser una referencia para el proceso de ejecución del Plan de Regeneración y Repoblamiento de la ciudad de San José. Esta investigación se llevó a cabo como parte del proyecto final de graduación para optar por el grado de Licenciatura en Arquitectura y Urbanismo del Instituto Tecnológico de Costa Rica. This is a review of the architectural project entitled “Rehabilitation of vacant buildings to generate housing in the central area of San José”. The subject of the project described here is intended to be a point of reference for the implementation an area of a Regeneration and Repopulation Plan of the city of San Jose. This research was undertaken as part of final graduation project in Architecture and Urbanism at the Costa Rica Institute of Technology.

  2. Energy saving in buildings through the elimination of typical problems; Ahorro de energia electrica en edificios a traves de la eliminacion de problemas tipicos

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Rivero, Alex G. [Genertek, S. A. de C. V., Mexico, D. F. (Mexico)

    1993-12-31

    The enormous electric energy consumption in buildings represents an important area of saving opportunities. The design of installations without advanced technical illumination criteria, the absence of standardization over energy efficiency, the lack of observation of the existing standards and guides, the continuous load growth in existing installations and the lack of appropriate maintenance, are some of the causes of the inefficient use of electric energy in buildings. Although the problems, and consequently the solutions, are exclusive for each unit, some of the former are frequently repeated. In this paper the problems found along more than 40 audits conducted in large buildings of different types in Mexico city are commented. [Espanol] El enorme consumo de energia electrica en edificios representa una importante area de oportunidad para ahorro. El diseno de instalaciones sin criterios luminotecnicos avanzados, la ausencia de normalizacion sobre eficiencia energetica, la falta de observancia de las normas y recomendaciones vigentes, el continuo crecimiento de carga en instalaciones existentes y la falta de mantenimiento adecuado son algunas de las causas del uso ineficiente de la energia electrica en inmuebles. Aunque los problemas y por tanto las soluciones son particulares para cada unidad, algunos de los primeros se repiten frecuentemente. En este trabajo se comentan los problemas encontrados a lo largo de mas de 40 auditorias realizadas a inmuebles grandes de diversos tipos en la ciudad de Mexico.

  3. Fiol Olivan, F. (2014. Manual de Patología y Rehabilitación de Edificios Pathology Handbook and buildings Rehabilitation.

    Directory of Open Access Journals (Sweden)

    Héctor César Escudero Castro

    2014-08-01

    Full Text Available El Manual de Patología y Rehabilitación de Edificios de Fiol (2014 es un interesante libro que trata en, once capítulos, el conjunto de lesiones, que afectan a las edificaciones de toda época. En él encontramos un método de estudio de estos deterioros, la descripción de las causas que los provocan, los comportamientos mecánicos de los daños estructurales, así como una serie de propuestas para su corrección. Todo esto siguiendo como hilo conductor el término de patología y una clasificación de elementos y materiales arquitectónicos. En sus páginas el autor presenta la diferencia conceptual entre patología y lesiones (p.13-15, desarrolla un estudio estructurado de las lesiones, clasificándolas por el orden de surgimiento y por la naturaleza del proceso que lo genera. En donde, según el orden, las lesiones pueden ser primarias o secundarias, y, según el proceso que genera la falla, las lesiones pueden ser físicas, mecánicas o químicas (p. 17 - 30.

  4. DEPURACIÓN ALTERNATIVA, CON APORTE TÉRMICO DE ENERGÍA SOLAR

    Directory of Open Access Journals (Sweden)

    Antoni Martínez-Taberner

    2007-01-01

    Full Text Available La situación del Campus de la UIB, aislado de la ciudad, ligado al tema de la escasez del agua ha permitido el desarrollo de un sistema de depuración in situ de las aguas residuales producidas en las propias instalaciones universitarias. El proceso se desarrolla íntegramente con sistemas de depuración natural en un diseño que combina 3 tecnologías existentes: el lagunaje, los humedales construidos y los filtros verdes arbolados. La innovación se produce en un sistema de regulación térmica del lagunaje para evitar la inversión térmica, que provoca situaciones puntuales de malos olores. Se trata de aprovechar el calor residual de una instalación de climatización solar en un edificio cercano a la laguna, de tal manera que la laguna ejerza de refrigerador del sistema y a la vez aproveche el calor para potenciar la estratifi cación térmica.

  5. Jugando con las olas : a propósito de un mosaico de Carmona (Sevilla

    Directory of Open Access Journals (Sweden)

    Guadalupe López Monteagudo

    2011-01-01

    Full Text Available Los erotes y putti son particularmente abundantes en los mosaicos romanos, sobre todo en temas mitológicos y también en escenas de la vida diaria, como la pesca, la caza y las competiciones en el circo. Predominan, no obstante, los ambientes acuáticos y su relación con las divinidades marinas, resaltando el aspecto lúdico de su presencia. En el mosaico de Carmona y en otros muchos procedentes del Mediterráneo y del Oriente, de los siglos II al V d.C., en blanco y negro y en color, los amorcillos, los putti y también los pigmeos practican el «wind-surf» sobre un ánfora vinaria. Todos proceden de edificios termales.Mosaics depicting erotes and putti are frequent in Roman Art, particularly those presenting mythological subjects and also daily life scenes, fishing, hunting and circus races. However, most of them are related to aquatic contexts and maritime deities, focusing on the playful side of the images. In a mosaic from Carmona and in some others around the Mediterranean area and the East (II-V a.D erotes, putti and pygmei are depicted when sailing or windsurfing over wine-amphoras. All those patterns came from bath buildings.

  6. autorregulado con estudiantes universitarios

    Directory of Open Access Journals (Sweden)

    Jairo Andrés Montes

    2005-01-01

    Full Text Available El propósito del presente estudio es describir la forma en la que se presentan los procesos de aprendizaje autorregulado con un grupo de estudiantes (22 estudiantes de tercer semestre de Psicología de la PUJ, Cali, en el evento de preparación para la presentación un examen. Asimismo se describen las correlaciones que ocurren entre las distintas fases de dicho proceso de autorregulación del aprendizaje. Para conseguir los objetivos propuestos se ha hecho uso de una observación de desempeño en tiempo real, es decir, de la observación durante una sesión de preparación de examen de los estudiantes, en la cual se emplearon protocolos verbales para dar cuenta de lo que «pasaba por su mente» mientras estudiaban. Una entrevista semi-estructurada y una prueba objetiva. Los resultados fueron analizados a la luz del modelo mixto de procesamiento de información y constructivismo abordado por Winne(1998. Como resultado se encontró una relación significativa entre los niveles de desempeño en el proceso de ARR y el resultado del examen. Igualmente se encontraron bajos niveles de regulación en una parte importante de la muestra y un desfase significativo entre conocimiento declarativo de ARR y desempeño en el mismo

  7. LE CORBUSIER Y LOS EDIFICIOS DE GRAN ESCALA. DE LA COMPOSICIÓN POR ELEMENTOS A LA UNIDAD / Le Corbusier and the large scale buildings. From composition by elements to unity

    Directory of Open Access Journals (Sweden)

    Alejandro Virseda Aizpun

    2014-05-01

    Full Text Available RESUMEN Los edificios de gran escala de Le Corbusier en los años 30 y 40 se caracterizan por una “composición elemental” de dos volúmenes de naturaleza opuesta: un volumen–tejido, flexible y adaptable, generado a partir de una labor de “textúrica” consistente en la repetición de un módulo espacial –y estructural–, y un volumen–caja, platónico y cerrado, a modo de un objeto–tipo que contiene un espacio único representativo. Esta dualidad resuelve los dos deseos contradictorios entre los que se debate el arquitecto a la hora de definir la relación de estos proyectos con el contexto. Por un lado pretende que se adapten a las particularidades de cada emplazamiento manifestándose un elemento más de la totalidad urbana, pero por otro, desea destacarlos, demostrando su condición única y simbólica –en sentido clásico–. Las soluciones adoptadas parecen decantarse progresivamente hacia una opción cada vez menos contextual, en favor de una mayor representatividad de estas arquitecturas. Esta determinación es ya más evidente en los proyectos realizados tras la Segunda Guerra Mundial, en los años 50 y 60, produciéndose como consecuencia una sustancial variación compositiva en los mismos. La elementalidad bipartita es definitivamente sustituida por una volumetría unitaria en la que, eso sí, se puede seguir reconociendo reminiscencias de la realidad dual descrita. SUMMARY Le Corbusier’s large scale buildings of the 1930s and ’40s are characterised by an “elemental composition” of two opposed volumes of nature: a material-volume, flexible and adaptable, generated from a labour of “texturique”, a term used by the architect himself to define harmonic sizing from the metric units of the Modulor;and, a box-volume, Platonic and closed, as an object-type which contains a unique representative space. This duality resolves the two contradictory desires between which the architect debatedwhen defining the

  8. Application of scale test modules for model the electrothermal performance in buildings for the efficient use of energy; Aplicacion de modulos de prueba a escala para modelar el funcionamiento electrotermico de edificios para el uso eficiente de la energia

    Energy Technology Data Exchange (ETDEWEB)

    Acoltzi Acoltzi, Higinio

    2000-10-01

    and small vault pottery with glass sun reflector (34% in the experimental model and 37% in the theoretical model). [Spanish] La investigacion para acondicionamiento de espacios por enfriamiento en edificios de tamano real tiene un costo elevado por la cantidad de materiales y la variedad de parametros que intervienen. Por lo anterior, en este trabajo se utilizan modulos de prueba a escala acoplados a sistemas de aire acondicionado para obtener su respuesta electrotermica; es decir, cuantificar la cantidad de energia electrica que consumira un modulo en funcion de los materiales de prueba. Se analiza un modelo termico teorico transitorio y las pruebas experimentales del comportamiento termico de modulos de prueba a escala por la variacion de los materiales de los techos y ventanas, desarrollado con el objeto de establecer criterios de aplicacion de dichos materiales en las industrias de la edificacion. Adicionalmente se presenta el desarrollo de un modelo electrotermico teorico en estado permanente, que define el comportamiento del consumo de energia electrica, para mantener las condiciones de confort al interior de los modulos de prueba respecto a la variacion de los materiales mencionados. Se presenta tambien el diseno y el desarrollo de las pruebas experimentales utilizando los modulos de prueba a escala para validar el modelo electrotermico. La experimentacion se desarrolla exponiendo los modulos de prueba a escala, acoplados a los equipos de aire acondicionado, a la radiacion solar directa, registrando el consumo de energia electrica de los equipos de aire acondicionado, la radiacion solar sobre techo y ventanas de prueba, la temperatura interior de los modulos, la temperatura interior y exterior en la superficie de los techos de prueba, la temperatura ambiente, y la velocidad del viento. Los resultados obtenidos comparando las mediciones en campo y el modelo electrotermico teorico desarrollado, presentan diferencias promedio de 16%. Los ahorros de energia

  9. Puentes con vigas pretensadas

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1965-07-01

    Full Text Available This paper describes one of the three bridges which Hidrocivil, S. A., has built in Catalonia (northern Spain, over the river Ripoll. The other two bridges are very similar to this one, both in construction and design, and show only minor adjustments to the local topography. The contracting firm proposed several alterations in the prefabrication and constructional procedure, in relation to the initial project, and these changes were accepted. The main feature of these projects is the use of prestressed beams, built at the workshop in sections, and joined together by means of sixty 7 mm cables in each beam. As the shear forces are more acute at the joints, the end of each section has a kind of diaphragm, to provide a large contact area, and hence greater surface to transmit the shear forces. The methods of construction are also of interest. Briefly, they involve building the bridge piles, and use these to support a provisional structure with transversal movement. This provisional structure, in turn, served as platform for two bridge cranes, which lifted the girders to their final location. After the first span was completed, the deck was concreted and the auxiliary structure pushed forward to the next span, to repeat the same operations. This arrangement saved the use of provisional framework.En este trabajo se describe uno de los tres puentes que Hidrocivil, S. A., ha construido.—previo concurso— en la región catalana; concretamente, el que salva el río Ripoll. Los otros dos no han sido objeto de descripción general por ser muy similares, en lo que a ejecución y concepción se refiere, con la única variante que presentan las características topográficas locales. La empresa propuso ciertas variantes— que fueron aceptadas— en la prefabricación y métodos de construcción. El interés de estas obras se centra en el empleo de vigas pretensadas, prefabricadas en taller por trozos, y solidarizados en el mismo mediante las operaciones

  10. Violencia con el anciano

    Directory of Open Access Journals (Sweden)

    Rita Campillo Motilva

    2002-08-01

    Full Text Available La violencia doméstica es tan antigua como la humanidad misma y se reconocen la violencia infantil, contra la mujer y al anciano, fundamentalmente; siendo este último grupo una población en ascenso por las mayores expectativas de vida de los últimos años. Como resultado de ello, el número de casos de abuso en el anciano se incrementará y el impacto de este abuso sobre la salud debe ser considerado de forma adecuada. La gama de maltratos es variadísima e incluye el abuso físico, emocional, financiero, sexual, por negligencia, negación a brindarle ayuda y otras formas más. Los ancianos con deterioro cognitivo son los más vulnerables. El médico en la atención primaria de salud es un pilar importante en la prevención y educación de este problema.Domestic violence is as old as humanity itself. Child, women and elderly abuse are mainly recognized. The elderly group is increasing due to the higher life expectancy experimented during the last years. As a result, the number of battered elderly will grow and the impact of this abuse on health should be adequately considered. The range of abuse is very wide and it includes physical, emotional, financial and sexual abuse, negligence, rejection to give assistance and others. The elderly with cognitive deterioration are the most vulnerable. The physician at the primary health care level is an important milestone in the prevention and education of this problem.

  11. Modelo de asignación predictivo de longitudes de ondas en redes WDM teniendo en cuenta dispersión residual y tráficos unicast/multicast con QoS

    Directory of Open Access Journals (Sweden)

    Javier Sierra

    2009-01-01

    Full Text Available El tráfico de Internet está en constante crecimiento y con él las aplicaciones del tipo unicast/multicast con diferentes requerimientos de Calidad de Servicio (QoS. Esto es motivo para que las Redes de Transporte Ópticas (OTN deban continuar su evolución hacia redes completamente ópticas (sin conversiones Óptico-Electrónico-Óptico: OEO. S/G Light-tree es una arquitectura de los nodos de las redes all-OTN que permite el optimo enrutamiento y/o manejo de tráficos unicast/multicast empleando el concepto de Traffic Grooming (TG, granularidad de tráfico en un ambiente óptico. Las técnicas de grooming así como los algoritmos de asignación y enrutamiento propuestos hasta el momento no tienen en cuenta los fenómenos que se pueden prestar en la fibra óptica, los cuales atenúan o alteran las diferentes longitudes de onda en las redes WDM (Wavelength Division Multiplexing. La dispersión cromática es un fenómeno que deforma los pulsos transmitidos en una fibra óptica y el efecto depende de la longitud de onda empleada en la transmisión. En este artículo, se propone un modelo predictivo de asignación de longitudes de ondas basado en cadenas de Markov que tiene en cuenta la dispersión residual en redes WDM que soportan traffic grooming y tráficos unicast/multicast con requerimientos de QoS. Los resultados de las simulaciones realizadas muestran que el modelo propuesto mejora la probabilidad de bloqueo de tráficos con requerimientos de QoS.

  12. EFECTIVIDAD DEL MÉTODO DE FLUJO CON RECURRENCIA EN ESTUDIOS DE CIRCUITOS DE DISTRIBUCIÓN PRIMARIA; EFECTIVITY OF THE RECURRENT FLUX METHOD IN PRIMARY DISTRIBUTION STUDIES

    Directory of Open Access Journals (Sweden)

    Raúl Nicolás Carvajal Pérez

    2015-04-01

    Full Text Available Los estudios de circuitos de distribución comienzan con el cálculo de flujo de potencia por el circuito. Este refleja su estado actual en cuanto a pérdidas y caídas de tensión; básicos para cualquier análisis. Cuando se trabaja con técnicas genéticas, estos cálculos se realizan miles de veces. En este trabajo se sugiere un método de cálculo de flujo de potencia en circuitos de distribución radiales. Se aplica éste cuando solo se conoce la demanda total del circuito utilizando “Ardvinson” para asignar una “demanda de cálculo” a cada nodo. En esencia se realiza una primera iteración utilizando esa demanda y la tensión nominal del circuito en una dirección. La segunda iteración recurre a los valores obtenidos en la primera. Se exponen los cálculos realizados en un circuito real utilizando un sistema de cálculo específico y el Microsoft EXCEL para demostrar la rapidez del método y su nivel de exactitud. The first step in Distribution Circuits studios consist in power flux calculus. It shows the actual situation. of the circuit. When the studio is realized using genetic techniques, this step is repeated thousands times. A method to obtain power flux in distribution circuits is presented. The method is applied when only have the total circuit demand. Here is applied Ardvinson method to obtain “Calculus demand” in each node, realize the first iteration with these demand and nominal tension. Later, repeat the calculus using the values obtained before. An example of real circuit is resolved using specific software and EXCEL to demonstrate the efficiency of the method.

  13. Molecular diversity among domestic guinea-pigs (Cavia porcellus and their close phylogenetic relationship with the Andean wild species Cavia tschudii Diversidad molecular entre cuyes domésticos (Cavia porcellus y su relación filogenética cercana con la especie silvestre andina Cavia tschudii

    Directory of Open Access Journals (Sweden)

    ÁNGEL E SPOTORNO

    2004-06-01

    . tschudii (promedio de distancias K2P = 3,2 %; los mejores árboles tenían 609 pasos (CI = 0,796; Índice de Apoyo de Bremer (SI = 28, y un _Ln = 4.419,52; con apoyos de remuestreo de 100 % y 97 % respectivamente. Dicho clado también apareció en el análisis cladístico de los aminoácidos correspondientes, apoyado por tres sustituciones y 96 % remuestreo. Cuando el nodo de C. aperea fue forzado a unirse al de C. porcellus, estos árboles fueron consistentemente más largos, menos probables y robustos, y con menos caracteres definitorios que el óptimo. Todas las secuencias de C. porcellus se agruparon también en un nodo definido por 15 sustituciones. El subnodo con animales de mercados de ciudad, tiendas de mascota y laboratorios se caracterizó por cuatro sustituciones (una no silenciosa, SI = 7 y 91 % remuestreo. Los C. porcellus sudamericanos, llamados "criollos" por los criadores locales, son más diversos. Probablemente, un clado del sur del Perú y Chile representa un linaje precolombino. La distancia K2P promedio entre C. tschudii y aperea fué más bien grande, 7,7 %. Cavia apareció como un nodo robusto (100 % remuestreo. Estos resultados indican que C. tschudii es la especie más cercanamente relacionada a C. porcellus.

  14. El Sistema de información en la propiedad horizontal y su relación con los procesos contables

    Directory of Open Access Journals (Sweden)

    Omar Javier Solano Rodríguez

    2008-01-01

    Full Text Available Los ambientes computacionales con los últimos desarrollos tecnológicos permitirán cambios fundamentales en las estructuras contables y operativas de los edificios y conjuntos residenciales sometidos al régimen de propiedad horizontal y de las organizaciones en general. En el campo de los sistemas de información los cambios serán trascendentales. El presente artículo ilustra un panorama general del sistema de información y su interrelación con los procesos contables; se identifica la estructura básica del procesamiento electrónico de datos (PED, e incluye sus características; proporcionando al lector la relación entre los procesos contables automatizados con los controles a aplicar. Para concluir presentando un enfoque genérico sobre el apoyo que puede y debe brindar el control interno informático, en la cual sus procesos contables se encuentran automatizados.

  15. Comparación del modelo Hata con mediciones de atenuación en la ciudad de México

    Directory of Open Access Journals (Sweden)

    Fabiola Martínez-Zúñiga

    2012-01-01

    Full Text Available Este trabajo presenta la comparación de la aplicación del modelo Hata, con mediciones hechas en la banda de 400 MHz en la ciudad de México, se pretende establecer una alternativa de aplicación para las viejas ciudades coloniales españolas de América Latina. El estudio pretende establecer una relación objetiva entre el modelo y mediciones hechas en una ciudad de edificios de paredes gruesas de piedra, con alturas superiores a 15 m y calles angostas, que contrasta estructuralmente con las ciudades japonesas, en donde se hicieron las mediciones del modelo, por parte de Okumura y Hata. Se incluyen también en el análisis, las zonas modernas de paredes ligeras y baja altura de una zona típicamente urbana y sin dejar a un lado las zonas rurales que rodean normalmente a las antiguas ciudades. Los resultados se presentan comparando la atenuación en ambos casos, en función de la distancia.

  16. Acne polimorfo: tratamiento con Implacen

    Directory of Open Access Journals (Sweden)

    Rubén Pérez Armas

    1995-06-01

    Full Text Available Se realiza el estudio de 40 pacientes con acné polimorfo, los que fueron atendidos en la Consulta de Dermatología del Hospital Provincial Clinicoquirúrgico Docente "Celia Sánchez Manduley", en el período comprendido de enero de 1988 a diciembre de 1989. Se revisa la literatura médica sobre los diversos métodos y medicamentos utilizados en la terapéutica de esta dermatosis. Se describe el esquema de tratamiento empleado con implacén en 30 pacientes; los 10 restantes se trataron con placebo; se compara dicho esquema con los tradicionales y se observan mejores resultados con nuestro estudio. Se destaca la ausencia de recaídas, así como el resultado del tratamiento de acuerdo con el sexo.A study was performed in 40 patients presenting with polymorphic acne who were attended in the Dermatology Department of "Celia Sánchez Manduley" Clinicosurgical and Teaching Hospital from January, 1988 to December, 1989. A review of the literature was made seeking for the different methods and drugs used for the treatment of this dermatosis. The treatment schedule with the use of implacen in 30 patients is described. Such therapeutic schedule was compared with traditional ones and better results were observed with the use of implacen. The fact that there were no relapses is highlighted, as well as the result of treatment according to sex.

  17. Una visión holística de la reducción del impacto ambiental en edificios del área del Mediterráneo

    Directory of Open Access Journals (Sweden)

    Sabaté, J.

    2011-10-01

    Full Text Available LIMA, Low Impact Mediterranean Architecture, is an initiative that aims to demonstrate the technical feasibility and economic viability of drastically reducing the environmental impact of buildings in countries with warm climates. The initiative is applicable to both new construction and torefurbishment and leads to improvements in comfort and indoor quality. The holistic vision of the environmental impact presented here contemplates notonly the energy consumed in use but also the energy and water used in the complete life cycle of the building, including the energy embodied in the materials, as well as aspects relating to health and comfort. The verification methodology is based on the definition and the analysis of atypical, reference, block of flats, the actual construction of a prototype representative of a substitution of one flat within this reference block,and the monitoring and analysis of this prototype in standard conditions and also when actually occupied.

    LIMA, Low Impact Mediterranean Architecture, es una iniciativa que pretende demostrar la viabilidad tecnológica y económica de reducir drásticamente el impacto ambiental de las edificaciones en países de climas cálidos, aplicable tanto a obra nueva como a rehabilitación, mejorando al mismo tiempo su confort y habitabilidad. La visión holística del impacto ambiental aquí presentada incluye no solo el consumo de energía en la fase de uso del edificio, sino también la energía incorporada en los materiales de construcción en todo el ciclo de vida del edificio así como el ciclo del agua y aspectos de salud y confort. La metodología de verificación se basa en la definición y análisis de un edificio colectivo representativo y la construcción de un prototipo, parte ficticia del edificio total, para su análisis y monitorización, tanto en condiciones estandarizadas, como reales de uso.

  18. Estudio y diseño de un sistema inmótico para seguridad, comunicación y confort, utilizando el protocolo KNX para el edificio Torre Piamonte ubicado en el sector de Totoracocha de la ciudad de Cuenca

    OpenAIRE

    Jara Maldonado, Pedro Alcibiades

    2015-01-01

    El presente proyecto tiene como objetivo el estudio y diseño de un sistema inmótico para el edificio "Torre Piamonte" de la Ciudad de Cuenca. El estándar propuesto es el KNX. Se tiene los planos arquitectónicos y el diseño de planos inmóticos del edificio. Al final se obtiene el TIR y VAN para verificar la factibilidad del proyecto. This project aims to study and design of a building automation system for the "Torre Piedmont" building in the City of Cuenca. The proposed standard is the KNX...

  19. El liderazgo de los profesionales de enfermería y el rendimiento organizativo: un estudio exploratorio con aplicación del Análisis de Redes Sociales

    Directory of Open Access Journals (Sweden)

    María del Pilar Marqués-Sánchez

    2014-12-01

    Full Text Available Las personas son seres sociales que buscan construir puentes de identidad y de amistad entre ellos. Estos nodos y lazos construyen redes dentro de los equipos de trabajo, lo que podría ser útil para que los directivos de salud los optimizaran. Por esta razón se aplicó el ARS al contexto de hospitales y centros de salud, y así determinar cómo las redes están construidas en las unidades clínicas y cómo influyen en la autopercepción de los trabajadores sobre el rendimiento grupal. Se aplicó el ARS para determinar la posición central y de liderazgo de los individuos en la redes. La muestra fue de 177 profesionales procedentes de organizaciones sanitarias públicas en España. Los médicos y las enfermeras tienden a diferir en cuanto al liderazgo y a la relevancia que otorgan a las redes. El liderazgo médico es mayor en la Red del Consejo, y el de las enfermeras en la Red de Ayuda y de Motivación. Las redes están positivamente relacionadas con el rendimiento. Este estudio empírico muestra que hay redes sociales dentro de los equipos de salud. Las enfermeras juegan un rol de liderazgo como mediador entre las distintas sub-redes dentro de las unidades clínicas.

  20. con mala calidad de vida

    Directory of Open Access Journals (Sweden)

    Agustín Martín-Rodríguez

    2007-01-01

    Full Text Available En este estudio ex post facto se ha analizado si los familiares de pacientes con mala calidad de vida presentan diferencias en las variables clínicas de personalidad y relaciones familiares en función de que el paciente haya estado o no ingresado en una Unidad de Cuidados Intensivos. Seleccionamos dos grupos: 29 familiares de pacientes traumatizados graves transcurridos cuatro años de su ingreso en una UCI de Traumatología y con mala calidad de vida (debido a secuelas físicas y/o psicológicas tras el ingreso, tales como traumatismos craneoencefálicos, politraumatismos y tetraplejias traumáticas y 32 familiares de pacientes con mala calidad de vida con cuatro años de evolución de su enfermedad física (hipertensión, diabetes, artritis reumatoide y síndrome de intestino irritable que no han estado ingresados en la UCI. Para alcanzar nuestro objetivo empleamos una Encuesta Psicosocial y los siguientes instrumentos: Cuestionario de Análisis Clínico, Escala de Clima Social en la Familia y Escala de Adaptación Psicosocial de la Enfermedad. Los resultados mostraron que los familiares de pacientes con mala calidad de vida que estuvieron ingresados en la UCI hace cuatro años, presentan diferencias significativas en las variables agitación y expresividad comparados con los familiares de pacientes con mala calidad de vida que no han estado ingresados en la UCI.

  1. El Instituto de Secundaria Enseñanza de Cáceres. El edificio y sus mejoras (1900-1936. The Secondary School of Cáceres. The building and improvements (1990-1936.

    Directory of Open Access Journals (Sweden)

    Cristina Redondo Castro

    2016-06-01

    Full Text Available (ES Los centros escolares forman parte del patrimonio histórico-educativo, además de constituir un testimonio muy importante de la historia de la educación y de la historia social y cultural. Los primeros institutos, reconocidos como Institutos Históricos, son testigos privilegiados. En el caso de Cáceres, el legado más importante es el edificio que albergó al Instituto de Segunda Enseñan-za. En este trabajo se enumeran y documentan las mejoras que en él se llevaron a cabo tanto para adaptarse a los nuevos planes de estudios y corrientes pedagógicas, como para la conservación del edificio, en las fechas comprendidas entre 1900 y 1936. (EN Schools are part of the historical and educational heritage, besides being a very important testi-mony of the history of education and of the social and cultural history. The first secondary schools, recognized as historical ones, are privileged witnesses. In the case of Cáceres, the most important legacy is the building that housed the Secondary School. This article lists and gives evidences of the improvements that were carried out both to adapt to new curricula and pedagog-ical trends and to the maintenance of the building between 1900 and 1936.

  2. El Edificio Alto de los Pinos: una aproximación al espacio doméstico en Salmona desde el límite de la vivienda colectiva

    Directory of Open Access Journals (Sweden)

    Ingrid Quintana Guerrero

    2010-12-01

    Full Text Available ¿Es posible identificar el espacio doméstico en un proyecto determinado mediante la búsqueda de sus límites? Para responder a ello el artículo propone una reflexión desde algunos autores reconocidos en la fenomenología, principalmente Henry Maldiney (inspirado a su vez en Merleau-Ponty, debido a la importancia que otorga tanto al cuerpo y su movimiento en la concepción y posterior vivencia del hábitat como a los pares dialécticos, donde residen las dimensiones profundas de la arquitectura. Dicha reflexión se convierte en el sustrato teórico del recorrido imaginario presentado, a través de un proyecto de vivienda colectiva de Rogelio Salmona. En el Edificio Alto de los Pinos se encuentran estrategias similares que en otros proyectos de su autoría, donde el límite se fundamenta en las nociones de acontecimiento y errancia. La idea del edificio multifamiliar como una casa reinterpretada sienta las bases para el enriquecimiento de estudios y propuestas en torno al tema de la habitación contemporánea.

  3. Tratamiento con implantes Leader-Nano en paciente con oligodoncia

    Directory of Open Access Journals (Sweden)

    Salvador Javier Santos Medina

    2015-03-01

    Full Text Available Los implantes dentales de titanio han revolucionado el mundo de la rehabilitación desde su surgimiento. De manera particular, el empleo de implantes de carga inmediata acorta el tiempo quirúrgico y protésico, con el consiguiente bienestar estético. Se presenta el caso de una paciente femenina de 32 años de edad, con antecedentes de oligodoncia de ambos incisivos laterales superiores y portadora de prótesis parcial acrílica. Fue atendida por el equipo multidisciplinario de implantes en la Clínica Estomatológica Docente “3 de Octubre” y se le realizó tratamiento de rehabilitación integral con implantes Leader-Nano y prótesis fija con corona acrílica sobre dichos implantes. La implantología fue satisfactoria en la paciente; la mejoría estética y funcional, así como la satisfacción de la paciente, fueron los principales logros obtenidos

  4. Valoración de riesgos inducidos por la construcción de nuevos edificios en el campus de la Universidad de Deusto. España

    Directory of Open Access Journals (Sweden)

    Saiz de Omeñaca, Jesús

    1990-06-01

    Full Text Available A study of the morphology of the basin adjacent to a projected construction site revealed that this building and others nearby could suffer serious damage in the event of flash flooding. In order to evaluate this risk, a number of factors were calculated; the amount of water that could fall onto the basin in case of extraordinary precipitation, the permeability of the soils and regoliths, the retention capacity of the vegetation, etc. After studying a number of possible solutions it was decided that a drainage gallery should be built. The dimensions and layout of this gallery would guarantee adequate drainage, make periodic cleaning possible and improve the geotechnic conditions in the area adjacent to the building site. A number of other recommendations were made with special emphasis on the importance of conserving the soils, regoliths and vegetation of the basin. Now that the project has been completed and a period of time has passed, it can be asserted that the proposed solution has functioned perfectly without any unforeseen problems.

    El estudio de la morfología de una cuenca adyacente a los terrenos donde se proyectaba construir un gran edificio, reveló que éste y otras construcciones podrían resultar seriamente dañadas a causa de avenidas violentas. Para valorar tal riesgo, se calculó la cantidad de agua que en caso de precipitaciones extraordinarias caería en la cuenca, la permeabilidad de la misma, las posibilidades de retención por la vegetación, los suelos y los recubrimientos geológicos y diversos factores capaces de agravar la situación. Se estudiaron posibles soluciones, eligiéndose la construcción de una galería de drenaje cuyo trazado y dimensiones garantizaba no solamente una correcta evacuación, sino también la posibilidad de que fuera sometida periódicamente a limpieza y unas mejores condiciones geotécnicas en la parte de la vaguada contigua a la construcción. Se realizaron también diversas

  5. con dietas suplementadas con Cromo-L-metionina

    Directory of Open Access Journals (Sweden)

    Ram\\u00F3n Garc\\u00EDa-Castillo

    2006-01-01

    Full Text Available Un total de 48 cerdos (Sus scrofa domesticus; 24 machos castrados y 24 hembras cruzados (Yorkshire, Hampshire, Duroc y Landrace de 3,5 a 4,0 meses de edad y 60,0 ± 5,0 kg PV en finalización. Se alimentaron con dietas isoproteícas (14,5 % PC e isoenergéticas (3.400 kcal EM/kg de MS, adicionadas con Cr-L-metionina (MiCroPlex® (0, 200, 400 y 600 ppb. El experimento tuvo una duración de 45 días y se realizó de agosto a noviembre del 2002 en las instalaciones de la Universidad Autónoma Agraria Antonio Narro, localizada en Saltillo, Coahuila, México. Al tener los animales aproximadamente 95 kg PV, se tomó muestra de 15 ml de sangre por cada animal para determinar la concentración de glucosa, ácido úrico, creatinina, urea, proteinas totales y colesterol. Se aplicó un diseño completamente al azar con arreglo factorial 2 x 4; dos para el factor sexo y cuatro para nivel de cromo. Los metabolitos en suero no fueron afectados (P>0,05 por el factor sexo. La glucosa en suero disminuyó (P<0,05 y el colesterol incrementó (P<0,05 con cromo en la dieta. Se concluye que el Cr incrementa el metabolismo de glucosa y disminuye el de colesterol, con lo cual puede haber energía disponible para síntesis de proteína la cual es necesaria para el crecimiento de los animales

  6. Recubrimiento de acero con polidopamina

    OpenAIRE

    Carrasco Rodríguez, Javier

    2013-01-01

    Se ha obtenido recubrimientos de polidopamina en acero mecánicamente resistentes y con tiempos de obtención relativamente pequeños a través de la polimerización de la dopamina bajo diferentes condiciones.

  7. La documentación geométrica de elementos patrimoniales con láser escáner terrestre. La experiencia del Lapa en Galicia

    Directory of Open Access Journals (Sweden)

    Mañana Borrazás, Patricia

    2009-12-01

    Full Text Available In this text we show some geometric documentation of various elements of Cultural Heritage. We use a Terrestrial Laser Scanner, a Leica HDS3000, a survey instrument that allows a high density register with pinpoint accuracy. The basic aim of this article is to evaluate the documentation posibilities of this kind of Terrestrial Laser Scanner and the different problems that emerged. As an example, we present the work processing of the topographic survey of a hillfort, the record in full detail of an archaeological excavation, the survey of a building and a two site of Rock Art.

    En este texto se presentan una serie de trabajos de documentación geométrica de diversos elementos patrimoniales realizados con láser escáner 3D. En ellos hemos empleado el modelo de Leica HDS3000, un instrumento topográfico que permite una captura de datos densa y con una resolución milimétrica. El objetivo principal de este documento es evaluar las posibilidades de registro de este escáner en distintos tipos de sitios así como los problemas que se generaron. Como ejemplos, presentamos el proceso de trabajo para obtener la topografía de un castro, el registro de detalle de una excavación, el levantamiento de un edificio y de unos petroglifos.

  8. Santiago, una ciudad con temor

    Directory of Open Access Journals (Sweden)

    Enrique Oviedo S.

    1999-04-01

    Full Text Available El objetivo general de este artículo es evaluar los efectos de la inseguridad ciudadana en el uso del espacio público. Dicha evaluación exige analizar dos relaciones que se establecen en el ámbito de la violencia: la relación entre victimización y percepción de inseguridad; y la que se establece entre actitudes sociales y resolución pacífica de conflictos nacionales. Para ello, se analizaron las variables victimización, percepción de inseguridad, uso del espacio físico, actitudes hacia el sistema institucional político y social y hacia la resolución de conflictos nacionales, y las posibles relaciones entre ellas. Los datos para realizar el estudio se obtuvieron por medio de una encuesta que se llevó a cabo con 1 200 personas de 18 y 70 años de edad residentes en la ciudad de Santiago. Los resultados indican que Santiago es una ciudad de habitantes con temor y que el aumento de la percepción de inseguridad de sus habitantes contrasta con el hecho de que las tasas de victimización se hayan mantenido, más o menos, constantes en los años que precedieron a la encuesta. El temor se relaciona con el abandono del espacio público físico y sociopolítico, así como con el refugio en los espacios y la vida privados. La actitud de resolver los conflictos por medios no pacíficos es frecuente y se asocia en mayor medida con la inseguridad, la actitud negativa hacia la democracia y la falta de expectativas sobre el futuro del país. Los resultados de este estudio respaldan la idea de que para superar el temor la gente tiende a adaptarse a la realidad adoptando una postura conformista, homogeneizando las creencias y los comportamientos, y sobreestimando la fuerza como medio para resolver las diferencias.

  9. Santiago, una ciudad con temor

    Directory of Open Access Journals (Sweden)

    Oviedo S. Enrique

    1999-01-01

    Full Text Available El objetivo general de este artículo es evaluar los efectos de la inseguridad ciudadana en el uso del espacio público. Dicha evaluación exige analizar dos relaciones que se establecen en el ámbito de la violencia: la relación entre victimización y percepción de inseguridad; y la que se establece entre actitudes sociales y resolución pacífica de conflictos nacionales. Para ello, se analizaron las variables victimización, percepción de inseguridad, uso del espacio físico, actitudes hacia el sistema institucional político y social y hacia la resolución de conflictos nacionales, y las posibles relaciones entre ellas. Los datos para realizar el estudio se obtuvieron por medio de una encuesta que se llevó a cabo con 1 200 personas de 18 y 70 años de edad residentes en la ciudad de Santiago. Los resultados indican que Santiago es una ciudad de habitantes con temor y que el aumento de la percepción de inseguridad de sus habitantes contrasta con el hecho de que las tasas de victimización se hayan mantenido, más o menos, constantes en los años que precedieron a la encuesta. El temor se relaciona con el abandono del espacio público físico y sociopolítico, así como con el refugio en los espacios y la vida privados. La actitud de resolver los conflictos por medios no pacíficos es frecuente y se asocia en mayor medida con la inseguridad, la actitud negativa hacia la democracia y la falta de expectativas sobre el futuro del país. Los resultados de este estudio respaldan la idea de que para superar el temor la gente tiende a adaptarse a la realidad adoptando una postura conformista, homogeneizando las creencias y los comportamientos, y sobreestimando la fuerza como medio para resolver las diferencias.

  10. Electrolisis de una disolución de ácido sulfúrico con empleo de electrodos de Cu. Práctica simulada interactiva.

    OpenAIRE

    Milla González, Miguel

    2010-01-01

    En esta práctica simulada se realiza la electrolisis de una disolución de ácido sulfúrico 0.1 M utilizando electrodos de cobre. Para ello se hace el montaje experimental (mostrado mediante una sucesión de fotos) y se pesa previamente el ánodo que está constituido por una lámina de cobre. El experimento se inicia encendiendo la fuente de tensión. En este momento comienzan las reacciones redox en cátodo y ánodo. El proceso puede detenerse en cualquier instante, pero es aconsejable hacerlo para ...

  11. Metodología para determinar la huella ecológica de la construcción de edificios de uso residencial en España

    OpenAIRE

    Solís-Guzmán, Jaime

    2013-01-01

    La actividad constructora es en la actualidad una gran consumidora de recursos naturales. Para evaluar este consumo de recursos generalmente se han empleado metodologías relacionadas con el Análisis de Ciclo de Vida. Se plantea en esta comunicación la integración del indicador Huella Ecológica (HE) en el sector edificación, para observar las dificultades y las ventajas que puede generar respecto a otros indicadores. Para ello, se pretende adaptar los conocimientos previos relacionados con el ...

  12. pacientes con insuficiencia renal terminal

    Directory of Open Access Journals (Sweden)

    Karen Herrera Herrera

    2011-01-01

    Full Text Available La presente investigación fundamenta en la clínica psicoanalítica el estudio de dos casos de tres personas diagnosticadas con IRT que reciben tratamiento de hemodiálisis, en razón a que dadas las características y el aumento de los reportes que se presentan, ya esto se considera un problema de salud pública. El objetivo principal es describir las características dinámicas del proceso de duelo en pacientes con IRT en un centro de terapia renal de la ciudad de Cartagena. El procedimiento metodológico empleó un diseño de tipo cualitativo; la investigación se desarrolló con un diseño clínico mediante el estudio de casos, y fundamentada en la hermenéutica psicoanalítica. Todo esto respaldado en la historia clínica, la entrevista semiestructurada individual y familiar, los test proyectivos, test del dibujo de la figura humana Machover y TAT de Murray, para la debida integración de los análisis. Se concluye que predominan funciones fallidas de los progenitores y que son individuos provenientes de familias psicosomáticas, que utilizan la enfermedad para obtener un beneficio secundario.

  13. con bajo peso al nacer

    Directory of Open Access Journals (Sweden)

    Adriana Mora Antó

    2005-01-01

    Full Text Available Esta investigación dio cuenta de la relación entre el estilo de funcionamiento familiar, los patrones de crianza y las edades de desarrollo evolutivo en niños, nacidos con bajo peso. El estudio descriptivo correlacional se realizó con 41 niños y sus madres, aplicándose cuestionarios sobre funcionamiento familiar, prácticas de crianza y desarrollo infantil. Los resultados señalaron la existencia de un funcionamiento familiar caracterizado por una cohesión amalgamada y una adaptabilidad caótica, una disciplina complaciente, falta de control y de límites claros en la díada madre-hijo. Se trataba de familias monoparentales, donde la temprana edad de concepción, el madresolterismo y el apoyo de la familia extensa eran constantes. Las edades evolutivas registradas indicaron un desarrollo inferior a la edad cronológica, en la mayor parte de los casos; sin embargo, éstas tendieron a ser superiores al compararlas con la edades reales de los infantes. No se encontró una correlación estadísticamente significativa entre la edad de desarrollo y los diferentes factores del funcionamiento familiar para algunos de los rangos de edad considerados; sin embargo, no se lo descartó por completo, especialmente en lo referente al optimismo familiar

  14. Procedencia y uso de madera de pino silvestre y pino laricio en edificios históricos de Castilla y Andalucía

    Directory of Open Access Journals (Sweden)

    Rodríguez Trobajo, Eduardo

    2008-12-01

    abastecimiento de madera de pino laricio a poblaciones del interior peninsular (Sevilla, Toledo, Madrid, etc.. Por otra parte, se analizan la diversificación de maderas y su uso selectivo en función del valor resistente de cada especie. Así mismo, las condiciones de disponibilidad determinan que un tipo de madera se convierta en fósilguía (especie-guía, que se propone como indicador cronológico de varios periodos y contextos constructivos. Finalmente, se estudian más en detalle restos lígneos del primer milenio de la Era, pertenecientes a la Mezquita de Córdoba y cuatro iglesias altomedievales de la cuenca del Duero (La Nave, Baños, Quintanilla y Barriosuso. La datación empírica y el análisis de este material aportan una cronología post quem de la construcción de estos edificios y también nuevos datos sobre la distribución de estas especies en la región norte de la Península Ibérica.

  15. Edificación y desarrollo sotenible. GBC: un método para la evaluación ambiental de edificios

    Directory of Open Access Journals (Sweden)

    Alvarez Ude, Luis

    2003-08-01

    Full Text Available The contribution of buildings to sustainable development should include as a strategic objective minimising or reducing as much as possible any negative local or global impact on the environment, and in relation to economic, social and matters by considering building processes as a whole, from beginning to end. This is why a work group has been set up in Spain as part of the Green Building Challenge (GBC group, whose primary goal is to develop a methodology for the environmental assessment of buildings. The GBC method is based on a set of criteria to study data provided by the inventory of a lifecycle analysis, establishing a number of environmental-impact categories: consumption of resources, direct environmental loads, interior environment quality, quality of service, economy, operational management, and transport. Within each of these categories a set of criteria f or comparison are defined, structured on a scale of credits to be assigned according to the corresponding degree of compliance. The relative importance of some criteria compared with others is determined by jeans of a number of weighting coefficients that are assigned to each of the assessment criteriaLa contribución de la edificación en un desarrollo sostenible debe plantearse como objetivo estratégico minimizar o reducir al máximo, tanto a nivel local como global, su contribución a los diferentes efectos negativos sobre el medioambiente, y en los aspectos económicos. sociales y culturales. considerando los procesos edificatorios de una forma integra, desde su inicio hasta su final. Este es el motivo por el que se ha constituido en España un equipo de trabajo que se integra en el grupo internacional Green Building Challenge (GBC. que tiene como objetivo primordial el desarrollo de una metodología para la evaluación medioambiental de edificios. El método GBC esta basado en un conjunto de criterios que analiza los datos aportados por el inventario de un análisis de cielo

  16. Conversando con...Momoyo Kaijima

    OpenAIRE

    Gómez Alonso, Carlos; Álvarez Isidro, Eva; Torres Barchino, Ana

    2017-01-01

    [ES] Momoyo Kaijima es profesora en la Facultad de Arte y Diseño de la Universidad de Tsukuba en la Prefectura de Ibaraki y profesora visitante en la ETH de Zürich, en Royal Academy of Fine Arts, en Rice School of Architecture y en Harvard GSD. A lo largo de los años, Atelier Bow Wow ha colaborado con Krešimir Rogina, arquitecto de Zagreb y socio de la firma internacional Penezic&Rogina, en la realización del Grožnjan International Summer School of Architecture, siendo Rogina el nexo indispen...

  17. À procura do sujeito no/do trabalho de Enfermagem: o acontecimento "Foucaultiano e as sujeições do trabalhador La procura del sujeto en/del trabajo de enfermería: el acontecimiento "Foucaultiano" y las sujeciones del trabajador The subject search at and of the nursing work: the Foucaul's event and the worker's subjections

    Directory of Open Access Journals (Sweden)

    Mara Ambrosina Vargas

    2007-03-01

    Full Text Available O ensaio reflexivo aborda o sujeito no/do trabalho em Enfermagem, tendo como suporte teórico o conceito de acontecimento em Foucault. Descreve e analisa quatro acontecimentos que podem sintetizar algumas das problemáticas da Enfermagem contemporânea, a saber: diferenças de realidade, hibridismo humano-máquina, rede de relações e processo de construção do conhecimento científico. Constata que as atuais sujeições do trabalhador mostram-se muito mais complexas, o que inviabiliza entender a questão da subjetividade do trabalhador em Enfermagem somente a partir da noção de sujeições econômicas. Porém, sinaliza que, mesmo não escapando de determinados modos de sujeição do presente, há espaços produtivos de desafios, lutas, portanto de liberdade para repensar o trabalho na Enfermagem.El ensayo reflexivo aborda al sujeto en el/del trabajo en enfermería, tiene como soporte teórico el concepto de suceso en Foucault. Describe y analiza cuatro sucesos que pueden sintetizar algunas de las problemáticas de la enfermería contemporánea, como por ejemplo: diferencias de realidad, hibridismo humano máquina, red de relaciones y proceso de construcción del conocimiento científico. Constata que las actuales sujeciones del trabajador se muestran mucho más complejas, lo que hace inviable entender la cuestión de la subjetividad del trabajador en enfermería solamente a partir de la noción de sujeciones económicas. Sin embargo, señala que, aunque no escape de determinados modos de sujeción del presente, hay espacios productivos de desafíos, luchas y, por lo tanto, de libertad para repensar el trabajo en enfermería.The reflexive essay approaches the subject at/of nursing work, grounded by the Foucault´s theoretical concept of event. It describes and analyzes four events that can synthesize some of the contemporary nursing problems, that is: different realities, man-machine hybridism, net of relations, and the process of

  18. El sentimiento en la antigua construcción. Revestimientos con mortero de cal, estucos y terrajados en el Jardín del Príncipe del Real Alcázar de Sevilla

    Directory of Open Access Journals (Sweden)

    Robador, M.D.

    2006-06-01

    Full Text Available In this text we describe a detailed study on the influence of sentiment in coverings with the historical mortars of lime and stucco. As is wellknown, these materials have been used in construction for many centuries. Given its long use, its application was performed in a totally artisan form, very different to how it is carried out today, whereby modern technology is increasingly used through mechanical means. In artisan work, handcrafted work without machinery predominates. Hence the skill of the artisan is where the predominance lies. As an example we give the restoration of the Real Alcazar´s “Patio del Príncipe” of Seville, in which the utilization of the historical mortars of lime and stucco have been fully respected, manually applied in the same way as was done in those times when plastering was carried out on large continuous surfaces and on window frames, doorways, arches, cornices and decorative elements. The objective was to conserve those minute imperfections in the restoration which give artistic quality and singularity to this building in the search for authenticity in the project. As a conclusion of the study and practical application in this unique work, it has been observed how the traditional mortars of lime and stucco notably influence the quality of the restoration, and how the small artisan imperfections of the manual work draw attention to this building, thereby providing the same sensation as the building has always given, and underlining the coldness with which machines without spirit communicate in all artistic work.Se entiende por sentimiento la huella con que se marca el trabajo realizado artesanalmente por la mano del hombre que aplica los materiales. En esas pequeñas imperfecciones queda plasmada la mano y el sentimiento que artesanalmente “a mano” ha elaborado un objeto. En ello queda grabada su alma, su ánimo. Si observamos detenidamente los antiguos ladrillos de un viejo edificio

  19. Food irradiation - pros and cons

    International Nuclear Information System (INIS)

    1983-01-01

    The use of ionising radiation for food preservation is a much-disputed topic, both among experts and among consumers. Pros and cons of this issue were discussed in detail at the consumers' forum. Professor Dr. Johannes Friedrich Diehl, Director of the Institute for Biochemistry of the Food Research Centre, Karlsruhe, is a well-known supporter of the new method of food preservation; he sees advantages in the radiopreservation of food because, for example, losses due to inedibility are reduced, the danger of salmonellosis is decreased, just as the use of chemicals. He thinks this method to be without danger to health, shown by many years of experience. Opponents to food irradiation like Prof. Dr. Konrad Pfeilsticker, Professor for food science and food chemistry at the Bonn University deem the method to be unnecessary and raise the problem of qualitative changes caused in the food. In the course of the discussions, the pros and cons seemed to balance each other out. (orig./AJ) [de

  20. De paseo con los Bourbaki

    Directory of Open Access Journals (Sweden)

    Miquel Escudero

    2012-04-01

    Full Text Available Setenta y siete años después de la fundación del grupo Bourbaki, procedemos a una reflexión que puede ser útil para los estudiantes que acaso no sepan de su existencia, ni tan siquiera los de matemáticas. Sería interesante conocer que a este grupo se le debe el signo del vacío como conjunto. Con todo lo discutible que sea el método Bourbaki en su reinterpretación de la matemática, no cabe duda de su importante repercusión hasta el punto de que ha marcado una época. Hay un antes y un después tras su irrupción, ningún matemático de primera fila de la segunda mitad del siglo XX fue ajeno a su influjo, para encabezarlo o para reprobarlo. Comenzaron como una juvenil extravagancia, pero repleta de conocimientos y con decidida voluntad de aprehender el rigor de forma exhaustiva.

  1. Tratamiento del paciente con artrosis

    Directory of Open Access Journals (Sweden)

    Francisco Vargas Negrín

    2014-01-01

    Full Text Available El manejo terapéutico del paciente con artrosis tiene como objetivo disminuir la sintomatología dolorosa e inflamatoria, mejorar la capacidad funcional del paciente y la aplicación de intervenciones terapéuticas eficaces y lo más seguras posibles. Un enfoque centrado en el paciente implica su participación activa en el diseño del plan terapéutico y en la toma de decisiones informadas oportunas en todas las etapas de la enfermedad. La educación terapéutica, la actividad física y el ejercicio terapéutico junto con el control de peso, en caso de sobrepeso u obesidad, constituyen el núcleo central del tratamiento. Los autocuidados individuales y por los familiares son fundamentales en el control del día a día del paciente. El uso de terapias físicas, ayudas técnicas (bastón, etc. y de fármacos tipo analgésicos simples, opioides y antiinflamatorios tiene evidencias demostradas en el control del dolor, mejora la funcionalidad y la calidad de vida del paciente y una clara recomendación de uso en el tratamiento de la artrosis. La cirugía conservadora y la de reemplazo articular se indican en los casos en los que no se logran los objetivos terapéuticos en casos concretos.

  2. El Caribe reflejado en el Carnaval de Cádiz con el Atlántico como espejo

    Directory of Open Access Journals (Sweden)

    ANA MARÍA BARCELÓ CATALAYUD

    2017-01-01

    Full Text Available El carnaval es la fiesta más peculiar de Cádiz y una de las manifestaciones más singulares de su modalidad en el mundo. Un fenómeno que se basa principalmente en las coplas, en el ingenio de sus letras y en la variedad de las músicas, cada año nuevas y diferentes; el Carnaval de Cádiz se inspira en la vida real, en las imágenes arquetípicas de la tradición, el teatro y el cine, en leyendas, óperas o zarzuelas. Otra de sus especificidades es el disfraz, que en Cádiz se conoce como tipo, que es algo más que un conjunto de prendas: es la materialización del carácter representado por cada agrupación. La evolución del tipo, que está en relación directa con el tema de su repertorio, ha discurrido en paralelo a la sucesión de hechos reales, hitos literarios, artísticos, sociales, cinematográficos, televisivos y otros. El Carnaval de Cádiz ha ido adoptando estilos innovadores procedentes de su propia evolución y otros adquiridos de distintos carnavales. En este sentido, ha sido fundamental la situación geoestratégica de la ciudad, al sur de Europa y próxima a África, pero, sobre todo, de su puerto, nodo de comunicaciones marítimas entre las dos orillas del Atlántico. El intercambio de mercaderías y pasajeros acarrea la introducción de usos y costumbres y del propio carnaval, a través de los comerciantes genoveses que establecieron en la ciudad sus negocios, o los ritmos africanos aportados por los esclavos en su paso desde África hacia las nuevas tierras americanas. En el ir y venir por el océano Atlántico, las coplas regresaron con cadencias habaneras y otros compases antillanos que se sumaron a los cantes de la tierra. Aunque su aparición es muy anterior, fue la asunción de su organización a finales del siglo XIX, por parte de la autoridad municipal, la que deja huella documental de cómo esta fiesta ha ido conformando un estilo propio de Cádiz en el que las coplas, unión de letras rimadas con músicas, cada a

  3. Development of a electrothermal model to scale to determine the energy behavior in buildings with air conditioning; Desarrollo de un modelo electrotermico a escala para determinar el comportamiento energetico en edificaciones con aire acondicionado

    Energy Technology Data Exchange (ETDEWEB)

    Acoltzi, Higinio [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    2001-07-01

    determinar el comportamiento energetico de modulos de prueba a escala de edificios. El modelo determina la historia del consumo de energia electrica para mantener la condiciones de confort al interior de los modulos, respecto a la variacion de los materiales de los techos y ventanas; todo esto con el objeto de establecer criterios de aplicacion de dichos materiales en la industria de la edificacion. Se presenta los consumos de energia electrica para los modulos con techos de loza monolitica, vigueta y clabovedilla y ventanas con vidrios reflectasol, filtrasol y claro. Finalmente, se presentan los resultados preliminares de la aplicacion del modelo propuesto a un edificio de escala normal. Las mediciones en campo y el modelo electrotermico teorico desarrollado, presenta diferencias promedio de 16%. Los ahorros de energia electrica observados con la aplicacion del modelo electrotermico teorico son: 1) si se cambia el vidrio claro por vidrio filtrasol, se pueden lograr ahorros de energia hasta del 14.5% para la loza de vigueta y bovedilla y de 12.4% para la loza monolitica; o 2) si se cambia el vidrio claro por vidrio reflectasol se pueden obtener ahorros de energia hasta de 28.1% para el caso de loza de vigueta y bovedilla y de 16.8% para la loza monolitica. La mejor opcion es sustituir la loza monolitica y vidrio claro por la loza de vigueta y bovedilla y vidrio reflectasol para obtener hasta un 37% de ahorro. Se muestra el arreglo de dispositivo experimental con los 3 modulos acoplados al aire acondicionado, y una con paracion grafica entre el consumo de energia acumulada teorica y experimental del modulo con loza de vigueta y bovedilla para los vidrios reflectasol, filtrasol y claro. Se da un resumen de los consumos de energia electrica totales.Verificacion experimental para determinar el comportamiento energetico de modulos de prueba a escala de edificios. El modelo determina la historia del consumo de energia electrica para mantener la condiciones de confort al interior

  4. Application of the optimum reactive power dispatch to the cost establishment for the support voltage in a power electrical system for generalized dispatch; Aplicacion del despacho optimo de potencia reactiva al establecimiento del costo por el soporte de voltaje en un sistema electrico de potencia con despacho centralizado

    Energy Technology Data Exchange (ETDEWEB)

    Barragan Gomez, Sergio Baruch

    2004-05-15

    de operacion. Por lo tanto existe la necesidad de determinar un costo por el soporte de voltaje de los generadores, ya que esta accion es considerada como un servicio auxiliar y es retribuida de manera independiente. En este trabajo, se utiliza el metodo del gradiente para solucionar el despacho de potencia reactiva y determinar el costo por el soporte de voltaje de cada generador participante en el sistema. El despacho de potencia reactiva esta sujeto a restricciones de igualdad que representan las ecuaciones de balance de potencia activa y reactiva de cada nodo y a restricciones de desigualdad que corresponden a los limites en los perfiles de voltaje de todos los nodos del sistema. Las restricciones de igualdad se consideran dentro del problema de optimizacion con el metodo de los multiplicadores de Lagrange y las restricciones de desigualdad a partir de funciones de penalizacion cuadraticas. El costo total por el soporte de voltaje de cada generador esta formado por un costo fijo y un costo variable. El costo fijo se calcula a partir del factor de recuperacion anual del capital invertido en el generador. El costo variable depende de las condiciones de operacion y del costo por perdida de oportunidad del generador. Para determinar el costo total por el soporte de voltaje de los generadores, se considera que el mercado de potencia activa ya ha sido resuelto con anterioridad a traves de un despacho economico de potencia activa. Los sistemas utilizados para la evaluacion del programa desarrollado son: el sistema de 5 nodos y el sistema de 30 nodos de la IEEE.

  5. Pirámide con rampa n° III, Pachacámac. Nuevos datos, nuevas perspectivas

    Directory of Open Access Journals (Sweden)

    1999-01-01

    Full Text Available PYRAMIDE A RAMPE N° III, PACHACAMAC - NOUVELLES DONNEES, NOUVELLES PERSPECTIVES. Les pyramides à rampe de Pachacamac sont traditionnellement interprétées comme des temples secondaires en relation à la divinité principale du grand site préhispanique côtier, et comme des ambassades des ethnies fidèles au culte durant la Période Intermédiaire Récent ( ca. A. D. 900-1470. Afin d’en connaître davantage à ce propos, il a été décidé de fouiller la pyramide N° III, l’un des exemples les plus monumentaux du site. L’édifice est décrit et les objectifs des recherches sont présentés en détails. La chronologie, le développement architectural, le fonctionnement et le système constructif sont expliqués sur la base des données récoltées sur le terrain. Les résultats mettent en doute le caractère spécifiquement religieux de la pyramide, laquelle apparaît comme un palais construit par et pour un chef. Quand meurt celui-ci, on l’enterre dans sa pyramide, et l’édifice est abandonné. Les implications de ce modèle alternatif sont discutées. Las pirámides con rampa de Pachacamac, tradicionalmente se han interpretado como templos secundarios, relacionados con la divinidad principal del gran sitio prehispánico costeño, así como de embajadas de etnias fieles al culto en el Período Intermedio Tardío (ca. A. D. 900-1470. Con el fin de conocer más al respecto, se decidió la excavación de la pirámide n° III, uno de los ejemplos más monumentales del sitio. En el presente artículo, se describe el edificio y se presenta detalladamente los objetivos de nuestra investigación. La cronología, el desarrollo arquitectónico, el funcionamiento y el sistema constructivo están explicados sobre la base de los datos recogidos en el campo. Los resultados ponen en duda la naturaleza específicamente religiosa de la pirámide, que aparenta ser un palacio construido por y para un curaca. Cuando muere el curaca, es enterrado en su pir

  6. Caracterización térmica de placas de yeso con material de cambio de fase incorporado

    Directory of Open Access Journals (Sweden)

    García, A.

    2010-09-01

    materiales de cambio de fase, ubicación en el edificio,…, para constituir un sistema de almacenamiento de calor latente, que, complementado con estrategias pasivas (captación solar, ventilación natural, reduzca las necesidades de consumo energético para la climatización de edificios. Se obtiene que las placas de yeso con un 45% en peso de material de cambio de fase es capaz de almacenar en 1,5 cm de espesor, 5 veces la energía térmica de un panel de yeso laminado con el mismo espesor, y la misma cantidad que 1/2 pie de fábrica ladrillo hueco sencillo, en el rango de temperaturas próximas a la de confort (20-30 ºC, manteniendo las propiedades físicas y mecánicas exigidas en la normativa.

  7. Characterization and main pathologies of the sandstone “Piedra Dorada” used in historic buildings in the cities of Úbeda and Baeza (Jaén, southern Spain); Caracterización y principales patologías de la arenisca “Piedra Dorada” empleada en los edificios históricos de las ciudades de Úbeda y Baeza (Jaén, Sur de España)

    Energy Technology Data Exchange (ETDEWEB)

    Gisbert, J.; Navarro, R.; Sánchez-Valverde, J.; Baltuille, J.M.; Sebastián-Pardo, E.

    2017-09-01

    ógicas, texturales y geoquímicas así como las propiedades físicas de las variedades de “Piedra Dorada”. Además se profundiza en el estudio de las principales patologí- as encontradas en los edificios históricos de las ciudades anteriormente citadas. A partir de los diferentes parámetros determinados se ha establecido un orden de calidad de las variedades de “Piedra Dorada”. También se han caracterizado los mecanismos de deterioro entre los que se encuentran: colonización bioló- gica (líquenes, algas, musgos y plantas superiores), ascenso capilar, depósitos superficiales (sales y costras negras) y deterioros debidos a factores antrópicos como fugas en la red de alcantarillado, ausencia de cubiertas y bajantes, etc. Este estudio ha permitido conocer en detalle una de las piedras de construcción más importantes de Andalucía con el fin de garantizar su perdurabilidad a través de los años.

  8. Cons ICARUS, TIGER and Fascism

    Directory of Open Access Journals (Sweden)

    Janez Vrečko

    2010-12-01

    Full Text Available Like the scientists of their time, Russian artists in the 1920s considered gravity the central problem – a view which points to the close harmony between modern physics and the avant-garde. It was only with the constructivist movement that the Icarus revolution grasped the principles of the “mobile philosophy” (3.651 which was almost at the same time recognised by modern physics as well. The static view of the world became obsolete, space and time were no longer absolute values. It was necessary to transcend Euclidean geometry, shake off the political ʻshackles on one’s hands’ and surrender to Lisicki’s imaginary space, where “At 2000 metres in the air / there is no more perspective” (Integrals 276.  Kosovel’s Icarus project accorded with Tatlin’s, and both of them accorded with the quintessential aims of the constructivist movement. It is no accident that Kosovel wished to name one of his poetry collections The Dream of Icarus. Poems on the Icarus theme, such as “Cons Icarus”, “Evacuation of the Spirit”, “Eh, Hey”, “A Heart in Alcohol” etc. belong to the group of Kosovel’s conses which follow his “mobile philosophy” (3.650 and “letters growing into space” (Int. 282.  The question “Man, do you want up in the air?” (Int. 128 will remain a question until the moment when man is finally ready to transcend the existing boundary and dive “beyond”. Hence Kosovel’s clear-cut contrast between the “green windows of an illuminated / express on a viaduct”, which moves horizontally and is, like a water current, subject to the earth’s gravity, and “the spirit in space”, whose direction of motion is “the perpendicular of the spirit”, atectonicity. “The spirit burns in space”: fire is an element that knows vertical movement alone, the only one of the elements to outgrow and transcend the earth’s gravity, therefore it is associated with another mythological figure important for

  9. Mejora del rendimiento térmico de los edificios históricos "difíciles de tratar" en el centro de Edimburgo = Improving The Thermal Performance of "Hard-to-Treat" Historic Buildings in Edinburgh’s New Town.

    Directory of Open Access Journals (Sweden)

    Julio Bros Williamson

    2016-04-01

    Full Text Available Compuestos alternativos en el sector de la envolvente se obtienen por extrusión de estirado de secciones y perfiles de panel de enclavamiento estrechas. Estos elementos estructurales, resistentes al impacto, tienen la ventaja de una instalación más rápida y segura, y su diseño modular les hace idóneos para muchos edificios y otras aplicaciones. Un desarrollo adicional en esta área puede ser la obtención de una alternativa sostenible a los perfiles compuestos actuales. Estudios anteriores han demostrado que los compuestos fabricados a partir de materiales naturales tales como fibras y polímeros bio-derivados, ofrecen una alternativa sostenible a los polímeros y materiales compuestos tradicionales. El objetivo de este desarrollo es reemplazar el típico perfil de acero ligero. Los perfiles de acabado también se pueden utilizar para terminar tabiques de mampostería existentes, revestimiento de ejes mecánicos y de extracción y revestimiento de la columna. Los perfiles se han diseñado utilizando bio-polímeros, reforzados con fibras naturales. Se han establecido los parámetros de procesamiento y las formulaciones apropiadas de bioresina y fibras naturales. También se ha evaluado la adaptación de las técnicas de procesamiento de pultrusión existentes a las características concretas de los nuevos biomateriales y fibras naturales. Como resultado, los perfiles de pultrusión adaptados a la construcción se han desarrollado con la incorporación de nuevos materiales y biomateriales basados en resina. Abstract This paper documents an innovative partnership project between Historic Scotland, the Scottish Energy Centre at Edinburgh Napier University and Castle Rock Edinvar Housing Association in which five Category B Listed, traditional pre-1919, solid wall ‘hard-to-treat’ residential tenement properties located within Edinburgh’s historic UNESCO World Heritage site each received energy efficient upgrades to walls and windows. A

  10. El patrimonio industrial como instrumento de revalorización y revitalización del espacio urbano: Aplicación al edificio Caixa Fórum (Madrid / Industrial Heritage as an Instrument for Urban Revaluation. The case of Caixa Fórum (Madrid.

    Directory of Open Access Journals (Sweden)

    Leticia Redondo Gómez

    2011-09-01

    Full Text Available ResumenPese a que el Patrimonio Industrial se encuadra dentro de los denominados emergentes, existen ya numerosos escritos que destacan la conveniencia de su recuperación como forma de progreso económico y social. Con la finalidad de valorar de forma objetiva el efecto real que la recuperación de una vieja industria tiene sobre la revitalización de un entorno, y tomando como base la antigua fábrica de electricidad de Mediodía, se lleva a cabo un estudio teórico-práctico de las variables que influyen tanto en el diseño del edificio en si mismo como en el espacio urbano resultante de tal intervención. El análisis de estos parámetros proporciona un punto de partida que permite concatenar y expandir un proceso que acaba delimitando su verdadera área física de influencia y las repercusiones que de ello se derivan para el ámbito público. Con el fin de evitar la paradoja de rehabilitar recintos que generen a su alrededor zonas desvitalizadas, y partiendo de la premisa de considerar la integración física (construir en contexto como punto clave para la verdadera regeneración de la zona, se asientan las bases para la implantación de políticas enfocadas hacia la dinamización en el ámbito local. Palabras clave Revitalización de barrios, construcciones industriales, dinamización urbana, diseño urbano.Abstract Although the Industrial Heritage falls within the so-called emerging, there are already numerous writings that emphasize the desirability of its recovery as a form of economic and social progress. In order to objectively assess the actual effect the recovery of an old industry has on the revitalization of the environment, and based on the old “Mediodía Electricity Factory”, it is carried out a theoretical and practical study of the variables that influence the design of the building itself as well as the urban space resulting from such intervention. The analysis of these parameters provides a starting point that allows to

  11. Fare astronomia con piccoli telescopi

    CERN Document Server

    Gainer, Michael K

    2007-01-01

    Non sono necessariamente richiesti strumenti mastodontici per produrre risultati scientificamente validi nel campo dell’astronomia. Anche l’astrofilo dotato di un piccolo telescopio, con un diametro di soli 8-9 cm, può contribuire alla scienza del cielo realizzando utili osservazioni del Sole, della Luna, dei pianeti, delle comete, degli asteroidi, delle stelle doppie o variabili, delle nebulose e degli ammassi stellari. Il manuale di M.K. Gainer spiega quale sia la dotazione minima (un piccolo telescopio, un computer, una semplice fotocamera digitale), come utilizzarla, e quali siano le tecniche appropriate da adottare nelle osservazioni. Offre inoltre schemi per interpretare e ridurre i dati raccolti, nonché schede da compilare e da spedire ai centri di raccolta internazionali. Questo libro è il passaporto grazie al quale l’astrofilo può entrare a pieno titolo nel mondo affascinante della scienza astronomica.

  12. Identificación de las barreras del entorno que afectan la inclusión social de las personas con discapacidad motriz de miembros inferiores

    Directory of Open Access Journals (Sweden)

    María Hurtado Floyd

    2012-01-01

    Full Text Available Objetivo: Identificar las barreras del entorno que afectan la inclusión social de una población con discapacidad motriz. Materiales y métodos: Se realizó un estudio descriptivo en el que participaron 45 adultos con discapacidad motriz de miembros inferiores. La encuesta incluyó las categorías: a sociodemográfica, de salud y características del entorno, b del acompañante o cuidador, c sobre los productos de apoyo, d actividades y participación, y e factores ambientales. Resultados: Un 98% pertenecía a los estratos socioeconómicos 1, 2 y 3, y en su mayoría (53% activos laboralmente, con salarios que no sobrepasan el mínimo legal vigente en Colombia. La causa principal de la discapacidad (42% fue la violencia. El 67% tenía alguna dificultad para acceder al entorno físico, la información y la comunicación. Las mayores barreras fueron el acceso a los edificios públicos (54% y a la educación técnica (83%. Conclusiones: Las múltiples barreras que afectan la inclusión social sugieren que se debe abordar esta problemática desde la estructura y organización social del entorno en que se desempeña la persona y no solamente desde su deficiencia. Como en otros estudios en Colombia, se corrobora la simultaneidad de pobreza, violencia y discapacidad.

  13. Escenario de la presencia italiana en La Plata : El edificio del Banco de la provincia de Buenos Aires como objeto de análisis

    OpenAIRE

    Carbonari, Fabiana Andrea; Grandis, María Belén de

    2015-01-01

    El presente artículo se inscribe en el plan de trabajo de la Beca Interna de Entrenamiento en Investigación de la FAU denominada Italianos en la ciudad de La Plata. El caso del Banco Provincia de la ciudad de La Plata que, durante el ciclo lectivo 2015 desarrolla la Arq. María Belén de Grandis con dirección de la Esp. Arq. Fabiana Carbonari. La misma tiene por objetivo realizar el estudio histórico sistemático del Banco de la Provincia de Buenos Aires. En ese sentido, propone analizar las tra...

  14. Re-ingeniería eléctrica del edificio de las aulas de ingenierías bloque B

    OpenAIRE

    Herrera Malliquinga, Paúl Darío; Zhune Villagran, Israel Wellington

    2013-01-01

    El presente proyecto de Tesis consistió en analizar la situación actual del sistema eléctrico del Bloque B de la Universidad Politécnica Salesiana Campus Centenario, con el propósito de verificar que el funcionamiento de las instalaciones eléctricas sean las apropiadas en función de la actividad principal de la Institución- El servicio de Educación, la investigación fue descriptiva en base a los análisis de riesgos de teorías dadas. Las principales actividades para la descripción documenta...

  15. Detección, identificación, intervención y gestión del amianto existente en los edificios de la UPCT

    OpenAIRE

    Sánchez Conesa, Tomás

    2012-01-01

    El amianto o asbesto (denominaciones de origen griego, cuyo significado es amianto‐incorruptible y asbestos‐inextinguible) es una sustancia mineral natural (silicato fibroso), con dos grupos mineralógicos: serpentinos y anfíboles, que se extrae de la roca en minas de distintos países, principalmente, Canadá, Rusia, Brasil, Australia y algunas zonas de África. El crisotilo pertenece al grupo de las serpentinas; los otros tipos de amianto son del grupo de los anfíboles. Las rocas...

  16. Depresion en pacientes con alteraciones del tiroides

    OpenAIRE

    Radanovic-Grguric´, Ljiljana; Filakovic´, Pavo; Barkic´, Jelena; Mandic´, Nikola; Karner, Ivan; Smoje, Juraj

    2003-01-01

    Nuestro estudio fue realizado en un grupo de 53 mujeres con disfunción tiroidea y 28 mujeres con depresión mayor. Empleamos la Escala de la Depresión de Hamilton, la Escala de Autoevaluación de la Depresión de Zung y la Escala sobre la Impresión Clínica Global. Los resultados del estudio demuestran que la mayoría de los pacientes con disfunción tiroidea se mostraron clínicamente significativos en cuanto al trastorno depresivo. Los episodios depresivos son más frecuentes en pacientes con hipot...

  17. Aprende Ajedrez con Rey - Parte 2

    OpenAIRE

    ESTÉVEZ MONTERO, RAÚL; Lloret Mauri, Jaime

    2016-01-01

    Es una pieza audiovisual creada con el objeto de atraer la atención de los niños de muy corta edad con el ajedrez y familiarizarlos con todas sus piezas y movimientos. Es una animación dirigida a un público infantil presentada por dibujos animados en 2D, en la que se ha intentado respetar en todo momento el argot de la comunidad ajedredística. En este video se presenta la segunda parte. Estévez Montero, R.; Lloret Mauri, J. (2016). Aprende Ajedrez con Rey - Parte 2. http://hdl.handle.net/1...

  18. Aprende Ajedrez con Rey - Parte 1

    OpenAIRE

    ESTÉVEZ MONTERO, RAÚL; Lloret Mauri, Jaime

    2016-01-01

    Es una pieza audiovisual creada con el objeto de atraer la atención de los niños de muy corta edad con el ajedrez y familiarizarlos con todas sus piezas y movimientos. Es una animación dirigida a un público infantil presentada por dibujos animados en 2D, en la que se ha intentado respetar en todo momento el argot de la comunidad ajedredística. En este video se presenta la primera parte. Estévez Montero, R.; Lloret Mauri, J. (2016). Aprende Ajedrez con Rey - Parte 1. http://hdl.handle.net/1...

  19. 2 obras de F. J. Barba Corsini: Edificio de los Laboratorios Boehringer Sohn Ingelheim, S. A. B., en San Juan Despí, Barcelona; Cine Victoria, en Hospitalet de Llobregat

    Directory of Open Access Journals (Sweden)

    Barba Corsini, F. J.

    1967-11-01

    Full Text Available Building for the Boehringer Sohn Ingelheim, S. A. E. Laboratories, at San Juan Despí – Barcelona The semibasement houses the services, including dressing rooms, dining hall, central air conditioning, stores, and other technical services. The ground floor comprises the main entrance hall and also some of the laboratories, whilst the rest of the building is mostly devoted to the functional purpose of the firm, i. e., laboratory work. The manager's office and council chamber are located on the second floor. The external aspect of the building reflects its function and is an outstanding example of impressive simplicity. Victoria Cinema, at Hospitalet de Llobregat – Barcelona The design of the building takes specifically into account the poor features of the site, the greater cost efficiency of reinforced concrete and the saving in construction time associated with metallic construction. Hence a compound design was adopted. All the external walls are built with unfaced brick, and «Durisol» has been adopted for the ceilings. The choice of illumination and colouring give the walls a fine quality, and emphasize their plastic texture. A restful quality and an indication of its commercial purpose are the fundamental features reflected by the external aspect of the building.Edificio de los Laboratorios Boehringer Sohn Ingelheim, S. A. E., en San Juan Despí- Barcelona La planta semisótano del edificio está dedicada a servicios: vestuario, comedor, central de acondicionamiento de aire, almacenes de utillaje, y servicios técnicos en general. En la planta baja se ha dispuesto el vestíbulo principal de acceso; y tanto en el resto de esta planta como en las superiores, se desarrollan todas las funciones de laboratorios. En la planta segunda se han instalado los despachos de Dirección, Sala de Juntas, etc. La expresión arquitectónica exterior del edificio responde a su utilidad y resalta por su elegante sencillez. Cine Victoria, en Hospitalet de

  20. Modelo metodológico para el estudio urbano-ambiental desde el concepto de análisis de ciclo de vida en el edificio

    Directory of Open Access Journals (Sweden)

    Mario Germán Martinez Caicedo

    2017-06-01

    Full Text Available La caracterización de la ciudad sostenible necesita desarrollar métodos de análisis con indicadores cuantitativos y modelos que permitan la toma de decisiones a corto y mediano plazo. Los sistemas de valoración ambiental para entornos urbanos y edificaciones están generalmente basados en actuaciones ponderadas cualitativamente y no muestran el verdadero panorama urbano de impacto ambiental. Teniendo en cuenta estas características, el presente trabajo desarrolla un sistema de evaluación y diagnóstico ambiental de lo edificado, que implementa el Análisis del Ciclo de Vida (ACV al contexto urbano, con el fin de generar un modelo de impacto que permite tomar decisiones en la intervención urbana, articuladas a las condiciones ecológicas del sistema soporte. La metodología implementada muestra la relación entre el volumen edificado y el impacto que ello genera en el ecosistema soporte para, de esta manera, generar mapas de impacto que permiten la reinterpretación ambiental de ciudad.

  1. Porcentaje de horas de confort térmico con técnicas de enfriamiento evaporativo indirecto en techos estanque en clima árido

    Directory of Open Access Journals (Sweden)

    Luis Carlos Herrera

    2014-06-01

    Full Text Available En este documento se presenta un estudio comparativo del porcentaje de tiempo en que la temperatura operativa se ubica dentro de los límites de la zona de confort propuesta por la norma ASHRAE 55-2010 para edificios libremente ventilados. Las temperaturas estudiadas se registraron al interior de módulos experimentales con techo estanque, emplazados en clima cálido seco, a los que les fueron aplicadas cinco técnicas de enfriamiento pasivo. El experimento se llevó a cabo en Chihuahua, México (Lat.: 28N, Long.: 106W, altura: 1.425m durante el verano de 2012. Los resultados indican que el techo estanque es una excelente alternativa para incrementar el porcentaje de horas de confort, pues se alcanza hasta un 30% más horas en promedio, respecto de un módulo control sin techo estanque. Si se añade enfriamiento radiativo nocturno, el porcentaje aumenta a 40%, e incorporando masa térmica, se incrementa hasta en un 65%. Incluso, en algunos casos, el enfriamiento es tan intenso que se sobrepasa el rango inferior de confort en horas de las mañanas.

  2. Plantas cubanas con efecto antiinflamatorio

    Directory of Open Access Journals (Sweden)

    Ada Ivis Regalado Veloz

    Full Text Available La actividad antiinflamatoria suscita gran interés científico en el área farmacológica, debido a que muchas enfermedades en su evolución cursan por procesos inflamatorios (artritis reumatoide, ateroesclerosis, cáncer, diabetes, gota, asma, dermatitis, trastornos neurodegenerativos y diversas dolencias menores. Las enfermedades inflamatorias constituyen un problema de salud importante, debido a la falta de medicamentos eficaces y seguros para su uso por periodos prolongados. Hoy en día se trabaja en la búsqueda de alternativas de antiinflamatorios más seguros, en el que las plantas medicinales, una de las formas más antiguas de tratamiento, constituyen una elección a considerar. En este trabajo se realizó una revisión bibliográfica, sobre especies de plantas que crecen en Cuba que le reportan propiedades farmacológicas como antinflamatorios. En la revisión de la literatura se utilizó la base de datos Medline (vía PubMed, así como revistas nacionales desde el periodo de 2000 hasta el presente, con las palabras claves "inflamación" y "plantas cubanas antiinflamatorias" o "actividad antiinflamatoria" y "plantas medicinales".

  3. Hospitalidad, con y sin papeles

    Directory of Open Access Journals (Sweden)

    Ana Paula Penchaszadeh

    Full Text Available Resumen El objetivo de este artículo es vincular el trabajo sobre el archivo de Jacques Derrida con la experiencia de la hospitalidad. Se intentará mostrar que, por un lado, se trata siempre de los papeles, de la legitimidad que éstos otorgan o no tanto a nivel filosófico (deseo de poseer los papeles que autoricen tal o cual decisión interpretativa, como a nivel político ("tener papeles" como el principio básico de todo derecho a tener derechos, de todo derecho a la comunidad. Mas también, por otro lado, se intentará pensar aquello que arruina la idea misma de tener o no tener (papeles, la idea de propiedad, aquello que hace imposible fundar una decisión o identidad en última instancia y, por ende, una soberanía, una frontera. La hospitalidad, la llegada inminente del otro, representa un desafío político y ético para la filosofía: pues no se trata de un saber, sino de una experiencia transformando el sustrato del nos-otros, del ser común.

  4. Itinerari Musicali con la Wiild

    Directory of Open Access Journals (Sweden)

    Elisabetta Nanni

    2013-03-01

    Full Text Available La Wiild, acronimo di Wiimote Lavagna Digitale, è uno strumento didattico che utilizza il telecomando della Wii, il famoso gioco della Nintendo, insieme a un software libero, rendendolo così estremamente versatile. Non vincolato a software proprietario, il suo utilizzo è legato alla capacità dell’insegnante di ripartire dalla didattica, dalle risorse selezionate e dall’epistemologia di ogni singola disciplina, trovando così nel proprio contesto un ruolo per le tecnologie. Il contributo presenta ipotesi di lavoro per l’educazione musicale nella scuola secondaria di primo grado che si sviluppano sia attraverso lo studio del rapporto suono/segno con affinità pittoriche e successiva codificazione grafica, sia attraverso un’attività di laboratorio in cui co-costruire percorsi storico-musicali. La Wiild diventerà davvero utile ed efficace nel momento in cui, affiancando le risorse selezionate dal docente, verrà utilizzata senza essere notata, giocando un ruolo di strumento tecnologico «normale e trasparente».

  5. Habitabilidad en la vivienda social en edificios para población reasentada: El caso de Medellín, Colombia

    Directory of Open Access Journals (Sweden)

    Mónica Mejía-Escalante

    2012-05-01

    Full Text Available Los habitantes del Morro de Moravia, asentamiento informal localizado desde 1970 en una de las áreas con mejor infraestructura en Medellín, han soportado un proceso de reubicación hacia la zona de expansión de Pajarito que abarca el periodo 20042012, bajo el objetivo superior asignado a los programas municipales de reasentamiento: "restablecer sus condiciones de hábitat", en conjuntos de vivienda social. De acuerdo con los elementos de una "vivienda adecuada" definidos en el Pacto Internacional de los Derechos Económicos, Sociales y Culturales (Pidesc, del cual Colombia es parte desde 1976, tal condición no ha sido alcanzada todavía en el proyecto estudiado. En este documento, las actuales carencias y necesidades aún no satisfechas de los reasentados surgen de sus propias voces. El propósito de la investigación que lo sustenta fue explorar las diferencias en las condiciones de habitabilidad de los hábitat de origen y destino en los procesos de reasentamiento, para determinar la correspondencia de estos proyectos residenciales con los componentes de una "vivienda adecuada".The inhabitants of the informal settlement Morro de Moravia, located since 1970 in one of the areas with better infrastructure in Medellín city, between 2004 and 2012 have been the target of a process of relocation to the urban expansion area called "Pajarito" under the higher aim of "restoring habitat conditions" in public housing According to the elements of an "adequate housing"' as defined by the International Covenant on Economic, Social and Cultural Rights (ICESCR, of which Colombia is Part of since 1976, adequate housing is yet not achieved, but its need and components emerge from the voices of this resettled people. This document proposes to explore the differences between the original and actual habitat conditions in resettlement processes, to inquire for its habitability and correspondence with the "adequate housing"' elements.

  6. Bases tratadas con cemento, en California

    Directory of Open Access Journals (Sweden)

    Chinchilla, M.

    1962-05-01

    Full Text Available El uso de bases tratadas con cemento para autopistas se inició en el Estado de California en 1938, empleándose para carreteras con determinadas condiciones de tráfico. Inicialmente, se especificó el uso obligatorio de plantas mezcladoras para asegurar el debido control de las proporciones adecuadas.

  7. Un conjunto constructivo altomedieval. Quintanilla de Las Viñas y las iglesias con cúpulas sobre pechinas de piedra toba de las provincias de Álava, La Rioja y Burgos

    Directory of Open Access Journals (Sweden)

    Caballero Zoreda, Luis

    2015-12-01

    Full Text Available Architectonic and structural forms, both preserved and ruined, are studied in this paper, as well as constructive customs and decorative solutions, in a group of tufa-stone pendentive domed churches from Álava, La Rioja and Burgos provinces. In a first step buildings are analyzed; secondly, decorative and constructive production is studied; and finally, datation of High Middle Age complex -between second half of the Ninth Century and the beginning of Tenth Century- is discussed since obtained data. These architectonic, constructive and decorative systems imply the existence of various productive groups which define a singular ensemble during the period of time and for the place in which this ensemble was active.Se estudian las formas arquitectónicas y estructurales, conservadas o arruinadas, los usos constructivos y las soluciones decorativas empleados en el conjunto formado por las iglesias con cúpulas sobre pechinas de piedra toba de las provincias de Álava, La Rioja y Burgos. Primero se analizan los edificios; en segundo lugar, la producción constructiva y decorativa; y finalmente, con los datos obtenidos, se argumenta la datación del conjunto en época altomedieval, entre la segunda mitad del s. IX e inicios del s. X. Estos sistemas arquitectónicos, constructivos y decorativos suponen la existencia de varios grupos productivos que conformaron un conjunto unitario durante el tiempo y en el territorio en que estuvo activo.

  8. Hibridación de técnicas de ingeniería inversa para el modelado preciso de estructuras, edificios y ciudades

    OpenAIRE

    Cosido Cobos, Óscar Jesús

    2017-01-01

    Uno de los temas más candentes de investigación en gráficos por computador de los últimos años es el uso de técnicas de realidad virtual y aumentada para el archivado, preservación y divulgación del patrimonio histórico y cultural. En este contexto, se plantea esta tesis relacionada con Sistemas de Gestión de la Información, GIS y Modelado 3D, Sistemas Estructurales y Patrimonio Industrial. Para poder simular y virtualizar la evolución histórica de una ciudad es necesario representar en prime...

  9. Evaluación del daño en edificios y desempeño sísmico: programa de ordenador CEINCI3

    OpenAIRE

    Aguiar Falconí, Roberto

    2001-01-01

    Las normas que están vigentes en la mayoría de los códigos y normativas sísmicas, tienen un objetivo principal, cual es que la estructura tenga un buen comportamiento inelástico ante un sismo severo, el mismo que se define mediante estudios de peligrosidad sísmica, considerando una vida útil de la estructura de 50 años y con un 10% de probabilidad de excedencia. Este sismo tiene un perí­odo de retorno que está alrededor de los 475 años. Para este evento, que tiene muy poca probabilidad de reg...

  10. Fuerza manual de adultos con discapacidad intelectual

    Directory of Open Access Journals (Sweden)

    Ruth Cabeza Ruiz

    2017-09-01

    Full Text Available Objetivo. Presentar una descripción de la fuerza de prensión manual de hombres y mujeres con discapacidad intelectual (DI y comparar los resultados con valores de referencia de otras personas con y sin discapacidad intelectual. Método. El presente trabajo es un estudio transversal observacional, financiado por la Fundación SAMU, en el que se evaluaron a 122 personas con DI (86 hombres y 36 mujeres durante el desarrollo de unas jornadas de carácter recreativo en las que participaron varias asociaciones de atención a este colectivo. La batería de test utilizada fue el Alpaha-Fit Test Battery for Adults. Resultados. Se presentan los resultados relacionados con las variables de fuerza del miembro superior (Hand Grip Strength por grupos de edad (20-24, 25- 29, 30-34, 35-39, 40-44, 45-49, 50-54, 55-59 años. Los datos muestran valores que oscilan desde los 31 kg en los hombres más jóvenes con DI hasta los 13.3 kg del grupo más maduro de mujeres. Estos hallazgos son similares a los valores de referencia de población con DI española. Sin embargo, son muy inferiores a los obtenidos por la población sin discapacidad de la misma edad. Conclusión. Los resultados evidencian el menor rendimiento de las personas con DI en pruebas de fuerza de prensión manual por lo que se hace evidente la necesidad de llevar a cabo programas de ejercicio físico o deporte con las personas con DI.

  11. Experiencias de haber crecido con un padre/madre con trastorno mental severo (TMS)

    OpenAIRE

    Vivanco B, Gabriela; Grandón F, Pamela

    2016-01-01

    Introducción. La experiencia de vivir con personas que presentan un Trastorno Mental Severo (TMS) es difícil para las familias, en especial para los hijos quienes han sido poco estudiados. El objetivo de la investigación fue conocer cómo la experiencia de haber vivido con un padre o madre con un trastorno mental severo influyó en la infancia, adolescencia y adultez joven de sus hijos e hijas. Método. Se analizan las experiencias de convivencia con un padre/madre con TMS en 10 hijos (6 hombres...

  12. El maltrato en las personas con discapacidad

    OpenAIRE

    Revuelta, Lucerga

    2014-01-01

    El maltrato no solo se realiza por acción sino también por omisión, la indiferencia hacia la persona con discapacidad es una forma de maltrato muy frecuente. Por ejemplo, ignorar y desatender las necesidades de la persona con discapacidad o, al contrario, la sobreprotección son maneras de maltrato. Cuando a un niño con discapacidad el padre o cuidador le hace todo, el niño se siente agredido pues le están incapacitando más de lo que su enfermedad ya lo hace.

  13. Hiperalgesia asociada al tratamiento con opioides

    OpenAIRE

    A. Gil Martín; M. Moreno García; J. Sánchez-Rubio Ferrández; T. Molina García

    2014-01-01

    La hiperalgesia inducida por opioides es una reacción paradójica caracterizada por una percepción intensificada de dolor relacionada con el uso de estos medicamentos en ausencia de progresión de la enfermedad o de síndrome de retirada. A diferencia de los casos de tolerancia, definida como pérdida de potencia analgésica durante el uso prolongado de opioides, no se produce mejoría con el escalado de dosis. La hiperalgesia inducida por opioides se ha manifestado en pacientes con dosis de manten...

  14. Tratamiento conservador en pacientes con retinoblastoma bilateral

    Directory of Open Access Journals (Sweden)

    Juan C. Suárez

    2008-11-01

    Full Text Available OBJETIVO: comparar el tratamiento convencional del retinoblastoma bilateral, usado hasta hace algunos años, consistente en radioterapia o enucleación bilateral, con el tratamiento conservador actual que incluye termoterapia transpupilar (TTT o TTT/quimioterapia al menos en un ojo, en niños con diagnóstico de retinoblastoma bilateral. DISEÑO: estudio retrospectivo descriptivo. MUESTRA: 20 pacientes con diagnóstico de retinoblastoma bilateral que consultaron al Hospital Universitario San Vicente de Paúl, de Medellín, Colombia, entre 1997 y 2007. MÉTODO: se hizo enucleación del ojo con el tumor de mayor tamaño. En el otro ojo se hizo tratamiento con TTT, con el láser diodo (810 nm, spot amplio, solo o combinado con otras terapias. RESULTADOS: se dividió a los pacientes en dos grupos: 16 pacientes (32 ojos en el grupo 1 tratados conservadoramente y 4 pacientes (8 ojos en el grupo 2 con tratamiento convencional. El rango de edad fue de 1-72 meses en el grupo 1 y de 1-12 meses en el grupo 2. El tiempo de seguimiento fue de 7-67 meses para el grupo 1 y de 13-73 meses para el grupo 2. En el grupo 1 se hizo enucleación de 16 ojos (50%, radioterapia externa de uno (3,1%, quimioterapia más termoterapia de 5 (15,6% y quimioterapia más termoterapia más crioterapia de 10 (31,3%. En todos los pacientes se logró preservar al menos un ojo. En el grupo 2, se enuclearon 7 ojos (87,5% y se hizo radioterapia externa más enucleación en un paciente (12.5%. Además, todos los pacientes recibieron quimioterapia. CONCLUSIÓN: la terapia conservadora actual consistente en tratamiento local (termoterapia, crioterapia o braquiterapia y quimiorreducción permite preservar al menos un ojo y en algunos casos de los dos, muchas veces con buena agudeza visual, en niños con retinoblastoma bilateral; se evitan así la enucleación bilateral y la radioterapia externa usada en el tratamiento convencional con todos sus efectos secundarios. La enucleación contin

  15. Paciente con tumor de cuerpo carotideo

    Directory of Open Access Journals (Sweden)

    Mariuska Forteza Sáez

    Full Text Available Los tumores de cuerpo carotideo (paragangliomas son neoplasias altamente vascularizadas, muy poco frecuentes y generalmente benignas, originadas en los quimiorreceptores del cuerpo carotideo. Se presenta el caso de un paciente de 54 años, con aumento de volumen cervical derecho, asintomático, con estudio preoperatorio y angiografía realizados por tomografía axial computarizada, que resultan compatibles con tumor de cuerpo carotideo. Se realiza disección subadventicial, informando la biopsia paraganglioma. El tumor fue completamente resecado, sin evidencia de recurrencia y sin complicaciones.

  16. Cambio en las redes sociales de adultos mayores beneficiarios de programas de vivienda social en Chile Changes in the social networks of older adults who are beneficiaries of public housing projects in Chile

    Directory of Open Access Journals (Sweden)

    Reinaldo Rioseco H.

    2008-03-01

    Full Text Available OBJETIVOS: Identificar, comparar y analizar las redes sociales de dos grupos de adultos mayores pobres, beneficiarios de dos tipos de viviendas sociales, en términos de tipos de nodos, frecuencia y motivo del vínculo, antes y después del traslado a sus nuevos domicilios. MÉTODO: Se realizó un estudio descriptivo de beneficiarios de viviendas en edificio, o bien de viviendas en condominios. El universo en estudio fue el colectivo de personas asignatarias a viviendas en edificio (n = 152 y a viviendas en condominio (n = 124, entre 1998 y 2001, a las cuales se les aplicó una encuesta en su domicilio. RESULTADOS: La mayoría de los participantes en el estudio informaron que la asignación de la vivienda implicó para ellos mudarse a barrios distantes de su antiguo domicilio, lo que provocó, entre otras consecuencias, un cambio en sus redes sociales. Ambos grupos tienen, en general, redes sociales similares, constituyendo los hijos el principal nodo de apoyo, antes y después del cambio de domicilio. Después del traslado se redujeron los vínculos en general, excepto en el caso de los adultos de vivienda en edificio, quienes incrementaron levemente sus vínculos con los hijos y en forma destacada con personas con quienes tienen vínculos débiles y que no son propiamente familiares ni amigos. Los vínculos con las instituciones también disminuyeron, aunque en el caso de las instituciones de adultos mayores aumentaron, para los residentes en condominios de 28% a 65%, y para los asignatarios de edificios, de 31% a 45%. CONCLUSIONES: Se sugiere que en los programas semejantes al estudiado se tome en cuenta la importancia que revisten la conservación y el fortalecimiento de las redes sociales creadas antes del traslado, y que se fomente la generación de vínculos en el nuevo sitio de residencia.OBJECTIVES: To identify, compare, and analyze the social networks of two groups of poor, older adults in two types of public housing projects in Chile

  17. Presa con revestimiento asfáltico

    Directory of Open Access Journals (Sweden)

    Proudfit, D. P.

    1960-07-01

    Full Text Available La presa denominada Montgomery se halla situada sobre el río South Platte River, a unos 8 km aguas arriba de la ciudad de Alma, del Estado de Colorado (EE. UU., y en la ladera oriental de la cordillera Continental Divide. El cuerpo o dique de esta presa está constituido por piedra, revestida con una capa de hormigón asfáltico en el paramento de contacto con el agua.

  18. Trastornos temporomandibulares en pacientes con maloclusiones

    Directory of Open Access Journals (Sweden)

    Luis Soto Cantero

    Full Text Available Introducción: existe una prevalencia de trastornos oclusales en gran medida relacionados con la presencia de disfunción temporomandibular. Objetivo: determinar el grado de disfunción temporomandibular según el Índice de Maglione en correspondencia con la prevalencia de maloclusiones en el área de salud del policlínico "Turcios Lima". Métodos: se realizó un estudio observacional descriptivo, de corte transversal, en la consulta de ortodoncia, de junio del 2008 a junio del 2009. De un universo constituido por los 280 pacientes que acudieron al servicio de ortodoncia en el período señalado con presencia de maloclusiones, se seleccionó una muestra de 84 pacientes por muestreo aleatorio simple, teniendo en cuenta los criterios de inclusión y exclusión realizados por criterios de expertos. Resultados: presentaban disfunción temporomandibular 74 pacientes y dentro de ellos 44 (52,4 % tenían disfunción grado II (Moderada. El 97 % de los pacientes con relación molar de clase II, presentaban disfunción temporomandibular. El 42,9 % de los pacientes con una maloclusión, presentaban disfunción grado I. El 60 % de los pacientes con dos maloclusiones presentaban disfunción grado II y el 66,7 % de los pacientes con tres maloclusiones, presentaban disfunción grado III. La mayor cantidad de pacientes tuvieron disfunción grado II (Moderada. Conclusiones: el mayor por ciento de los pacientes con disfunciones presentó una clase II molar y a medida que aumentó el número de maloclusiones aumentó también la severidad de la disfunción.

  19. RadCon: A Radiological Consequences Model

    International Nuclear Information System (INIS)

    Crawford, J.; Domel, R.U.

    2000-05-01

    RadCon estimates the dose received by user selected groups in the population from an accidental release of radionuclides to the environment. The exposure pathways considered are external exposure from the cloud and ground and internal exposure from inhalation and ingestion of contaminated food. Atmospheric dispersion modelling is carried out externally to RadCon.Given a two dimensional time varying air and ground concentration of radioactive elements, RadCon allows the user to: view the air and ground concentration over the affected area, select optional parameters and calculate the dose to people,display the results to the user, and change the parameter values. RadCon offers two user interfaces: 1) the standard graphical user interface which is started using Java DoseApp at the command line, or by setting up a shortcut to this command (particularly when RadCon is installed on a PC) and 2) the text based interface used to generate information for the model inter-comparison exercise . This is initiated using Java BIOMASS at the command line, or an equivalent shortcut. The text based interface was developed for research purposes and is not generally available. Appendices A, B and C provide a summary of instructions on setting up RadCon. This will generally be carried out by the computer support personnel

  20. Adolescente femenino con granulomatosis de Wegener fulminante

    Directory of Open Access Journals (Sweden)

    S C Scheffler-Mendoza

    2017-01-01

    Full Text Available Adolescente femenino de 13 años de edad, originaria de Guerrero, grupo étnico mixteco, padres analfabetos y con poco entendimiento del español. Sin otros antecedentes de importancia para el padecimiento. Inició un mes previo con la aparición de una pápula hipercrómica en párpado superior derecho que en los 10 días previos al ingreso aumentó de volumen generando proptosis. Al interrogatorio se negó dolor, lagrimeo, fiebre, o pérdida de peso. Ingresó con fiebre (39.0°C, palidez generalizada, proptosis derecha con exposición de córnea y conjuntiva, eritema periorbitario, movimientos oculares y agudeza visual disminuidos (i.e. contaba dedos a 1 m, pupila con tendencia a midriasis, hiperreactividad a la luz, y fondo de ojo con papila hiperémica edematosa y tortuosidad peripapilar. El resto de exploración no mostró datos relevantes. Se hospitalizó para iniciar tratamiento antimicrobiano parenteral de amplio espectro (i.e. ceftriaxona y vancomicina y abordar proptosis unilateral.

  1. Experiences on energy saving in Comision Federal Electricidad (CFE) buildings; Experiencias de ahorro de energia en edificios de la Comision Federal de Electricidad (CFE)

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez Velasco, Jorge E [Comision Federal de Electricidad (CFE) (Mexico)

    2005-07-01

    Transmision e inmuebles de oficinas. Y por ultimo los proyectos concluidos en el 2005 son las divisiones de distribucion, la Subdireccion de Construccion, las centrales generadoras, los inmuebles de oficinas, las unidades minisplit y sus ventajas con respecto a las unidades ventana.

  2. Experiences on energy saving in Comision Federal Electricidad (CFE) buildings; Experiencias de ahorro de energia en edificios de la Comision Federal de Electricidad (CFE)

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez Velasco, Jorge E. [Comision Federal de Electricidad (CFE) (Mexico)

    2005-07-01

    de Transmision e inmuebles de oficinas. Y por ultimo los proyectos concluidos en el 2005 son las divisiones de distribucion, la Subdireccion de Construccion, las centrales generadoras, los inmuebles de oficinas, las unidades minisplit y sus ventajas con respecto a las unidades ventana.

  3. Edificios protoindustriales para la producción de vino en Sicilia. Los palmentosy las bodegas del Etna desde el s. XVII al XIX

    Directory of Open Access Journals (Sweden)

    Cascone, G.

    1997-08-01

    Full Text Available In the Etnian region, during XVII and XIX centuries wine production begins to be made in a proto-industrial way. Great industries for wine production are built in these dates with a great technological and architectural specialization. Many of these constructions are in use today with good conservation state, but others are abandoned or ruined. In this paper the main characteristics of the "palmenti" and wine cellars that yet exist are analyzed. Architectural aspects are related with simple functionality aspects devoting special attention to the press machinery. The present state of this architectural patrimony and reasons to preserve and reuse it are discussed. Several ways and proposals to achieve this are defined at the end.

    En la región del Etna, entre los siglos XVII y XIX, la producción del vino empieza a hacerse de un modo protoindustrial. En tales fechas se construyen numerosas infraestructuras de grandes dimensiones para producir vino, denotando una gran especialización tecnológica y arquitectónica. Muchas de estas construcciones se usan aún hoy, manteniéndose en buen estado; otras, sin embargo, avanzan hacia el abandono y el deterioro. En el presente estudio se analizan las características principales de las bodegas y de los "palmentos" que han llegado hasta nosotros. Se relacionan los aspectos arquitectónicos con los puramente funcionales y se dedica una atención especial a la maquinaria de prensado. Se detalla al final el estado actual en el que se encuentra este patrimonio arquitectónico y se discuten las razones que hoy día animan a conservarlo y a volver a ponerlo en funcionamiento. Por último, se definen rápidamente los modos concretos y las propuestas para llevarlo a cabo.

  4. Dynamic simulation of an office with windows with solar control filter: cases in Mexico and Canada; Simulacion dinamica de una oficina con una ventana con filtro de control solar: casos en Mexico y Canada

    Energy Technology Data Exchange (ETDEWEB)

    Gijon Rivera, M. A.; Alvarez Garcia, G.; Xaman Villasenor, J. [Centro Nacional de Investigacion y Desarrollo Tecnologico, CENIDET-DGEST-SEP, Cuernavaca, Morelos (Mexico)]. E-mail: gaby@cenidet.edu.mx; I. Beausoleil-Morrison [Department of Mechanical and Aerospace Engineering, Carleton University, Ottawa (Canada)]. E-mail: ibeausol@mae.carleton.ca

    2010-11-15

    The use of solar passive strategies in buildings with large glazed areas such as new solar control coatings in windows are becoming more important and helpful recently, mainly because those developments can help to reduce heat gains and/or losses through transparent materials, reduce energy consumption, and improving the environment inside buildings. This paper presents an assessment of thermal performance in an office building with a SnS-Cu{sub x}S solar control coating and its influence on indoor conditions. The simulations consider climates of Mexico city and Ottawa as a good representation of two extremely conditions to asses the thermal behaviour inside offices, energy consumption, costs for air conditioning, and the influence of interior heat transfer coefficient correlations on energy consumption. The results are shown with and without the solar control coating adhered in a clear glass and in a double window configuration. The case of the system glass-film is the worst configuration as result of the high temperatures in the internal surface impacting the air point temperature and increasing the energy consumption. In general, the double glass configuration presents the best conditions, showing higher benefits for the case in Mexico City than the case of Ottawa. [Spanish] Resulta importante implementar estrategias pasivas en estudios de edificaciones con grandes areas de ventanas, como es la implementacion de nuevos materiales de control solar en vidrios que ayudan a reducir las ganancias y/o perdidas de calor a traves de los materiales transparentes, y asi reducir el consumo de energia y mejorar las condiciones del confort interior de los edificios. Este estudio realiza una evaluacion del funcionamiento termico de una pelicula selectiva de SnS-Cu{sub x}S que permite algunas ventajas termicas y opticas en el ambiente interno. Las simulaciones dinamicas consideran climas de la Ciudad de Mexico y Ottawa , con resultados que muestran las condiciones de confort

  5. RadConEd: A Graphical Data Editor for the Radiological Consequences Model, RadCon

    International Nuclear Information System (INIS)

    Crawford, J.; Domel, R.U.

    2000-05-01

    This document describes the application, RadConEd, which has been designed and implemented to enable users of the RadCon system to update these parameter files. The RadCon system is written in the Java programming language, and as such provides portability across computer platforms. The software described in this report was developed in line with the portability requirements of RadCon, thus providing a uniform user interface across computer platforms and bypassing the need of using system editors. In addition a number of data integrity measures were implemented

  6. Enfermedad coronaria en pacientes con psoriasis

    Directory of Open Access Journals (Sweden)

    Walter Masson

    2013-10-01

    Full Text Available Comunicaciones previas asociaron la psoriasis con la enfermedad coronaria. Desconocemos si en nuestro país o región existe dicha asociación. Se realizó un estudio transversal analizando los datos de la historia clínica electrónica de un sistema de salud de Buenos Aires. Analizamos todos los pacientes mayores de 18 años con diagnóstico de psoriasis entre el 1 de enero de 2003 y el 31 de julio de 2011 y los comparamos con un grupo control, en una relación 2:1, obtenido en forma aleatoria del mismo sistema de salud, apareados por edad y sexo. Determinamos la prevalencia de los factores de riesgo cardiovascular y de enfermedad coronaria. Analizamos la asociación entre la enfermedad coronaria y la psoriasis mediante análisis uni y multivariado. Se incluyeron 3 833 sujetos (1 286 pacientes con psoriasis y 2 547 controles. La prevalencia de hipertensión arterial (50% vs. 38%, p < 0.001, tabaquismo (25% vs. 17%, p < 0.001, diabetes (12% vs. 8%, p < 0.001 y enfermedad coronaria (4.98% vs. 3.06%, p = 0.003 fue mayor en los sujetos con psoriasis en comparación con el grupo control. Independientemente de la edad, la presencia de diabetes, hipertensión arterial o tabaquismo, hubo una asociación significativa entre la enfermedad coronaria y la psoriasis (OR 1.48, IC95% 1.04-2.11, p = 0.03. En conclusión, en esta población de Buenos Aires, los pacientes con psoriasis tuvieron una mayor prevalencia de diabetes, hipertensión arterial, tabaquismo y enfermedad coronaria. La asociación entre la psoriasis y la enfermedad coronaria fue independiente de los factores de riesgo explorados.

  7. Mincle Signaling Promotes Con-A Hepatitis

    Science.gov (United States)

    Greco, Stephanie H.; Torres-Hernandez, Alejandro; Kalabin, Aleksandr; Whiteman, Clint; Rokosh, Rae; Ravirala, Sushma; Ochi, Atsuo; Gutierrez, Johana; Salyana, Muhammad Atif; Mani, Vishnu R.; Nagaraj, Savitha V.; Deutsch, Michael; Seifert, Lena; Daley, Donnele; Barilla, Rocky; Hundeyin, Mautin; Nikifrov, Yuriy; Tejada, Karla; Gelb, Bruce E.; Katz, Steven C.; Miller, George

    2016-01-01

    Concanavalin-A (Con-A) hepatitis is regarded as a T cell-mediated model of acute liver injury. Mincle is a C-type lectin receptor (CLR) that is critical in the immune response to mycobacteria and fungi, but does not have a well-defined role in pre-clinical models of non-pathogen mediated inflammation. Since Mincle can ligate the cell death ligand SAP130, we postulated that Mincle signaling drives intrahepatic inflammation and liver injury in Con-A hepatitis. Acute liver injury was assessed in the murine Con-A hepatitis model using C57BL/6, Mincle−/−, and Dectin-1−/− mice. The role of C/EBPβ and HIF-1α signaling was assessed using selective inhibitors. We found that Mincle was highly expressed in hepatic innate inflammatory cells and endothelial cells in both mice and humans. Furthermore, sterile Mincle ligands and Mincle signaling intermediates were increased in the murine liver in Con-A hepatitis. Most significantly, Mincle deletion or blockade protected against Con-A hepatitis whereas Mincle ligation exacerbated disease. Bone marrow chimeric and adoptive transfer experiments suggested that Mincle signaling in infiltrating myeloid cells dictates disease phenotype. Conversely, signaling via other CLRs did not alter disease course. Mechanistically, we found that Mincle blockade decreased the NF-κβ related signaling intermediates, C/EBPβ and HIF-1α, both of which are necessary in macrophage-mediated inflammatory responses. Accordingly, Mincle deletion lowered production of nitrites in Con-A hepatitis and inhibition of both C/EBPβ and HIF1-α reduced the severity of liver disease. Our work implicates a novel innate immune driver of Con-A hepatitis and, more broadly, suggests a potential role for Mincle in diseases governed by sterile inflammation. PMID:27559045

  8. Mincle Signaling Promotes Con A Hepatitis.

    Science.gov (United States)

    Greco, Stephanie H; Torres-Hernandez, Alejandro; Kalabin, Aleksandr; Whiteman, Clint; Rokosh, Rae; Ravirala, Sushma; Ochi, Atsuo; Gutierrez, Johana; Salyana, Muhammad Atif; Mani, Vishnu R; Nagaraj, Savitha V; Deutsch, Michael; Seifert, Lena; Daley, Donnele; Barilla, Rocky; Hundeyin, Mautin; Nikifrov, Yuriy; Tejada, Karla; Gelb, Bruce E; Katz, Steven C; Miller, George

    2016-10-01

    Con A hepatitis is regarded as a T cell-mediated model of acute liver injury. Mincle is a C-type lectin receptor that is critical in the immune response to mycobacteria and fungi but does not have a well-defined role in preclinical models of non-pathogen-mediated inflammation. Because Mincle can ligate the cell death ligand SAP130, we postulated that Mincle signaling drives intrahepatic inflammation and liver injury in Con A hepatitis. Acute liver injury was assessed in the murine Con A hepatitis model using C57BL/6, Mincle(-/-), and Dectin-1(-/-) mice. The role of C/EBPβ and hypoxia-inducible factor-1α (HIF-1α) signaling was assessed using selective inhibitors. We found that Mincle was highly expressed in hepatic innate inflammatory cells and endothelial cells in both mice and humans. Furthermore, sterile Mincle ligands and Mincle signaling intermediates were increased in the murine liver in Con A hepatitis. Most significantly, Mincle deletion or blockade protected against Con A hepatitis, whereas Mincle ligation exacerbated disease. Bone marrow chimeric and adoptive transfer experiments suggested that Mincle signaling in infiltrating myeloid cells dictates disease phenotype. Conversely, signaling via other C-type lectin receptors did not alter disease course. Mechanistically, we found that Mincle blockade decreased the NF-κβ-related signaling intermediates C/EBPβ and HIF-1α, both of which are necessary in macrophage-mediated inflammatory responses. Accordingly, Mincle deletion lowered production of nitrites in Con A hepatitis and inhibition of both C/EBPβ and HIF-1α reduced the severity of liver disease. Our work implicates a novel innate immune driver of Con A hepatitis and, more broadly, suggests a potential role for Mincle in diseases governed by sterile inflammation. Copyright © 2016 by The American Association of Immunologists, Inc.

  9. Study of thermal behavior of the adobe with the simulator DOE 2.1E; Estudio de comportamiento termico del adobe con el simulador DOE 2.1E

    Energy Technology Data Exchange (ETDEWEB)

    Luna, Anibal; Gallegos, Ricardo; Bojorquez, Gonzalo [Universidad Autonoma de Baja California, Mexicali, Baja California (Mexico)

    2000-07-01

    A thermal analysis of the envelope of one of the most used housing models for low income groups, as those offered by the Mexican Government is presented in this report. The building's thermal gain in walls was determined, using: concrete block, brick and adobe; and considering concrete of roofing, concrete floors, windows and doors equal in all the cases. The objective of this study is to know the contribution to the building's thermal load of each one of the materials applied. The calculation was conducted using the Doe 2.1E thermal simulator software, using meteorological data for the city of El Centro, California, USA. This was so, because there is no reliable weather data for the city of Mexicali, B.C., where the housing units are. Because of geographical proximity between of these cities the same data was used. The properties for each one of the three building materials were taken from specialized bibliography. It was determined that the housing built with adobe walls has thermal advantages over the units built with concrete block and brick. The adobe unit has a lower thermal load of 13% over the concrete block, and of 3.44% over the clay brick unit. [Spanish] Se presenta el analisis termico de la envolvente de uno de los modelos de casas mas utilizados en la construccion de viviendas de interes social en Mexico. Se determino la ganancia, termica del edificio por muros, aplicando: bloque de concreto, ladrillo de barro y adobe. Se considero techo, piso, ventanas y puertas iguales en todos los casos. El objetivo del estudio es conocer la distribucion de la carga termica segun los materiales aplicados. El calculo se realizo con el simulador termico DOE 2.1E con datos meteorologicos de la ciudad de El Centro, California, E. U., por no contar con datos de Mexicali, B. C.: debido a la proximidad y similitud topografica entre ambas ciudades se uso la misma informacion. Las propiedades aplicadas para cada uno de los tres materiales fueron tomadas de

  10. Protection of structures and buildings against the effect of electrical storms: basic concepts, evolution and application in Mexico; Proteccion contra el efecto de las tormentas electricas de estructuras y edificios: conceptos basicos, evolucion y aplicacion en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Galvan Diego, Arturo; Velazquez Sanchez, Raul [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2001-07-01

    observacion cientifica, ha demostrado su eficacia en la modernizacion de cientos de procesos industriales, comerciales, de comunicacion y de servicios, asi como de los materiales y metodologias utilizadas para la proteccion de diversos equipos y procesos; desde la proteccion en sistema y equipos en alta tension hasta sistemas que manejan muy baja energia, entre los que incluyen electronicos y digitales. Sin embargo, existen leyes fundamentales como la ley de Ohm, la ley de gravedad o la ley universal de gases que, pese a que fueron descubiertos hace muchos anos, siguen vigentes y su validez proporciona elementos invaluables para el desarrollo de nuevos metodos, procesos y desarrollos tecnologicos. Uno de los casos mas relevantes que amalgama la aplicacion de criterios fundamentales y el desarrollo de nuevas tecnologias y su aplicacion en los llamados dispositivos de proteccion no convencionales lo constituye la proteccion contra el efecto de las tormentas electricas en edificios y estructuras. La aplicacion de estos dispositivos en el ambito mundial ha generado escepticismo de una gran parte de la comunidad cientifica, reacciones diversas entre los usuarios y un postura firme por parte de los fabricantes para que dichas tecnologias sean incluidas en normas internacionales. El objetivo de este articulo es ofrecer al lector la informacion basica sobre los inicios de la proteccion, la evolucion que los metodos de proteccion contra las tormentas electricas han tenido desde el siglo XVIII, la aplicacion de los criterios fundamentales de proteccion en estructuras o edificios modernos y su contenido, asi como la situacion que prevalece actualmente en los comites de las diversas organizaciones normativas nacionales e internacionales en lo referente a la inclusion de las nuevas tecnologias en las guias de diseno.

  11. Variables socionutricionales de hogares mazahuas integrados por preescolares desnutridos con madres con obesidad y sin obesidad

    Directory of Open Access Journals (Sweden)

    Conzuelo González, Viridiana Vanessa

    2009-01-01

    Full Text Available El primer objetivo fue conocer cuántos menores de cinco años con diferentes grados de desnutrición tienen una madre con sobrepeso/obesidad/ en una comunidad indígena que vive en extrema pobreza y bajo condiciones de migración masculina internacional. El segundo fue comparar tres variables socionutricionales (ingreso familiar, educación de la madre y adecuación nutrimental de la dieta diaria entre estos hogares y los hogares con desnutrición infantil y madres sin obesidad. Se realizó un estudio transversal (2006-2007, en la comunidad mazahua de San Francisco Tepeolulco, Municipio de Temascalcingo; que incluyó a 85 hogares integrados por preescolares con desnutrición inscritos al programa Oportunidades. Se determinó el estado nutrición de los preescolares con indicadores antropométricos y se obtuvo el IMC de las madres de estos infantes. Se aplicó una encuesta socionutricional, incluida el recordatorio de 24 horas, y complementado con la observación participante (cualitativa. Se encontró que 83% de las madres mazahuas presentaron sobrepeso u obesidad. El estado de nutrición de los preescolares con madres con obesidad presentó un porcentaje mayor de desnutrición (76%. En la variable género, se encontró que 54% de los niños con madres con obesidad tenía baja talla. Al relacionar el nivel educativo de la madre, esta variable resultó ser estadísticamente significativa (p=0.015, donde el analfabetismo está más relacionado con la desnutrición infantil que tienen madres de bajo y/o peso normal. La elevada prevalencia de hogares conformados con preescolares con desnutrición y madres con obesidad, es un síntoma más de la pobreza en zonas indígenas en México, con bajo índice de desarrollo humano.

  12. Impacto de la aplicación de la Ley 13059 de Eficiencia Energética en relación a la nueva Ordenanza de Usos del Suelo de la ciudad de La Plata y la Norma IRAM 11900 de Etiquetado de Edificios

    Directory of Open Access Journals (Sweden)

    Carolina Soledad Vagge

    Full Text Available El crecimiento urbano introduce permanente presión a las áreas metropolitanas. En países periféricos la demanda de energía crece a mayor velocidad que el crecimiento poblacional y la oferta, creando crisis y escasez. El objetivo principal de este trabajo es prever el impacto que tendrá la Ley 13059 de Eficiencia Energética en relación a la nueva Ordenanza de Usos del Suelo de la ciudad de La Plata y la Norma de Etiquetado de Edificios (IRAM 11900. Esta norma establece una metodología simplificada para el cálculo del nivel de eficiencia energética de las envolventes de los edificios susceptibles de ser calefaccionados. Todavía, es evidente que existe una importante falta de adecuación entre los objetivos teóricos formulados para el desarrollo de la ciudad y las conflictivas estrategias técnicas propuestas para satisfacerlos. En cuanto a la aplicación de la ley de eficiencia energética al modelo de edificio de construcción usual en La Plata, no verifica sus valores de transmitancia térmica K. Tampoco verifica el riesgo de condensación ni el coeficiente global de pérdidas G. Del mismo modo, cuando se aplica el protocolo de etiquetado de eficiencia energética que plantea la norma IRAM 11900, el edifico clasifica como H. Se puede ver que el impacto de ahorro potencial en la demanda de energía anual para calefacción, si se comienza a implementar la Ley de Eficiencia Energética sería de un 46%.

  13. Epilepsia de la infancia con paroxismos occipitales

    Directory of Open Access Journals (Sweden)

    Albia Pozo Alonso

    1999-09-01

    Full Text Available Se reporta que la epilepsia de la infancia con paroxismos occipitales constituye un síndrome epiléptico muy bien definido; se incluye en el grupo de las epilepsias idiopáticas relacionadas con localización. Los ataques comienzan habitualmente con síntomas visuales, en ocasiones seguidos por ataques hemiclónicos, parciales complejos y tónicoclónicos generalizados. El electroencefalograma interictal muestra complejos de puntaonda de localización occipital y temporal posterior que desaparecen con la apertura de los ojos. Se presenta una paciente de 8 años de edad que reúne los criterios clínicos y electroencefalográficos de la epilepsia de la infancia con paroxismos occipitales y se enfatiza en la evolución supuestamente benigna de dicho síndrome.Is is reported that epilepsy of childhood with occipital paroxysms is an epileptic syndrome that is well defined. It is included in the group of related idiopathic epilepsies with localization. Seizures habitually begin with visual symptoms, which are ocassionally followed by hemiclonic, complex partial, and generalized tonicclonic seizures. The interictal EEG shows spike-wave complexes of occipital and temporal posterior localization that are suppressed by eye opening. A patient aged 8 in whom the clinical and electroencephalographic criteria of epilepsy of childhood with occipital paroxysms are present is studied in this paper. Emphasis is made on the apparently benign evolution of this syndrome.

  14. Limits of reliability of optical properties of commercial glass in Mexico, a comparative analysis with experimental results; Limites de confiabilidad de propiedades opticas de vidrios comerciales en mexico, analisis comparativo con resultados experimentales

    Energy Technology Data Exchange (ETDEWEB)

    Barrios Rodriguez, Pilar; Dorantes Rodriguez, Ruben J. [Universidad Autonoma Metropolitana Azcapotzalco, Mexico, D.F. (Mexico)

    2000-07-01

    The heat transfer through the buildings has been increased by the intensive use of glass in the building's covering; this situation has demanded more electrical energy for compensate the heat's gain or loss. Energy use in buildings is responsible for some 50% of CO{sub 2} emissions in many countries, so it's necessary a building's thermal design for a rational use of energy. The glass is an important material in the building's encircling, so it's essential to count on precise values of the glass's properties for design building's covering. Experimental evaluation on optical properties in some building's glasses to compare the experimental values with manufacturer's reported values inside tolerance limits. [Spanish] La ganancia de calor solar al interior de las edificaciones se ha visto incrementada por la tendencia actual en el uso intensivo y extensivo del vidrio en la envolvente, lo que ha aumentado la necesidad del uso de energia electrica para compensar con climatizacion artificial las ganancias y/o perdidas termicas en los espacios interiores de las edificaciones. El gasto energetico en edificios es responsable de cerca del 50% de emision de CO{sub 2} en varios paises, por lo que es necesario un diseno termico de la envolvente que contempla un uso racional de la energia. Por la importancia termica que el vidrio tiene en la envolvente de las edificaciones y la necesidad de contar con el valor de las propiedades lo mas preciso posible para su diseno, se planteo evaluar en forma experimental el comportamiento termico de algunos vidrios que tuviesen uso tanto real como potencial en las edificaciones de nuestro pais y comparar los valores obtenidos con los valores reportados por los fabricantes dentro de limites de tolerancia o confiabilidad.

  15. Aspectos Psicosociales Relacionados con el TEPT en Pacientes con Cáncer de Mama

    OpenAIRE

    Hernández Moreno, Fresia Paloma; Landero Hernández, René

    2015-01-01

    El objetivo del estudio fue analizar la relación del estrés, la depresión y las estrategias de afrontamiento con el Trastorno de Estrés Postraumático (TEPT) en una muestra de pacientes con cáncer de mama. Se realizó con una muestra no probabilística de 52 mujeres con cáncer de mama. Se encontró una relación entre TEPT y estrés (r= .344, p= .014), TEPT y depresión (rs=.346, p= .013). El TEPT correlacionó con evitación cognitiva (r= .437, p= .001), TEPT y desesperanza (rs= .437, p= .001) y TEPT...

  16. Desarrollo de aleaciones multifuncionales con base titanio

    OpenAIRE

    Pareja, Ramiro

    2007-01-01

    El Laboratorio de Materiales Nano-estructurados y Multifuncionales del Departamento de Física de la Universidad Carlos III de Madrid se dedica al desarrollo, procesado y caracterización de aleaciones con propiedades mejores que las preparadas por métodos convencionales. La mejora de las propiedades se consigue produciendo las aleaciones con un tamaño de grano nanométrico o ultrafino, o introduciendo una dispersión de nano-partículas de óxido en la matriz. El grupo está interesado en algún tip...

  17. TIROTOXICOSIS GESTACIONAL: PATOLOGIA CON RIESGO VITAL

    OpenAIRE

    Valdés R.,Enrique; Pilasi M.,Carlos; Núñez U.,Tatiana

    2003-01-01

    Se presenta un caso clínico con diagnóstico final de Tirotoxicosis gestacional que debuta con una complicación excepcional, insuficiencia cardíaca congestiva e hipertensión pulmonar severa. Se presenta la experiencia del Hospital Clínico de la Universidad de Chile, proponiendo que su diagnóstico y tratamiento oportunos son la base del pronóstico de esta patología de riesgo vital para el binomio madre-hijo

  18. Amplificadores con transistores. Estudio y dimensionado

    OpenAIRE

    Lubiano García, Adrián

    2017-01-01

    Este trabajo es un estudio de las distintas configuraciones de los amplificadores con transistores vistos en la asignatura de Electrónica Analógica del tercer curso del Grado en Ingeniería en Electrónica Industrial y Automática de la Escuela de Ingenierías Industriales de la Universidad de Valladolid. En este trabajo se mostrarán los pasos seguidos en la creación de una aplicación con Visual Basic para la realización de los ejercicios de las distintas configuraciones, así...

  19. Galaxias australes con núcleo doble

    Science.gov (United States)

    Gimeno, G.; Díaz, R.; Carranza, G.

    Se estudia una muestra de galaxias australes con núcleo doble a partir de una búsqueda extensiva en la literatura. Se analizan las características morfológicas, fotométricas y espectroscópicas de la muestra. Para algunas galaxias se han realizado observaciones con el espectrógrafo multifunción (EMF) de la Estación Astrofísica de Bosque Alegre a partir de las cuales se determinaron parámetros cinemáticos.

  20. Motion equation of a finite dynamic elastic plane lineal element plane lineal element Ecuación del movimiento de un elemento finito lineal plano elástico dinámico con ocho grados de libertad

    Directory of Open Access Journals (Sweden)

    Américo G Hossne

    2010-12-01

    extremos o nodos lo ligan al resto de los elementos. La energía cinética (T y potencial (V de un elemento elástico dinámico son el basamento en la implementación del principio de Hamilton para la definición de un elemento finito. La definición de la energía cinética y potencial es el primer paso para la formulación variacional preliminar a la enunciación por elementos finitos que se utiliza para resolver, dígase, los problemas de mecanismos que se mueven en el plano utilizando la Ecuación de Hamilton. El objetivo general consistió en definir la Ecuación del movimiento de un elemento finito lineal plano elástico dinámico utilizando la Ecuación de Hamilton, a partir de la lagrangiana (T –V obtenida con el uso de un polinomio de quinto y uno de primer grados, con ocho grados de libertad, cuatro en cada nodo, que representaron las deformaciones: axial (u(x, transversal (w(x, pendiente ((dw(x/dx y curvatura ((d^2w(x/dx^2. La deformación debido al cizalleo transversal, insignificante comparado con la deformación flexional y la axial, la inercia rotatoria y las fuerzas friccionales en las uniones, fueron desestimadas con el fin de producir un elemento amigo. Los objetivos específicos fueron producir: (a la matriz de masa de traslación [MD], (b la matriz giroscópica de traslación [AD], (c la matriz de rigidez total de traslación [KD], y (d el vector de deformación (S. Como resultado se forjó la Ecuación del movimiento de un elemento finito lineal plano elástico dinámico[M_D](S'' − 2theta''[A_D](S' + {[K] − heta'^2 [M_D] −heta''[A_D]}(S = (Q .Se concluyó que la Ecuación obtenida variacionalmente con la aplicación del principio de Hamilton es un modelo cuyo procedimiento puede ser utilizado cuando se requiera aumentar el número de grados de libertad del modelo. 

  1. IoT con Raspberry Pi

    OpenAIRE

    García Muelas, Carlos

    2015-01-01

    Estudio de diferentes plataformas software y hardware del internet de las cosas. Aplicación real con Raspberry Pi. Estudi de diferents plataformes programari i maquinari de l'internet de les coses. Aplicació real amb Raspberry Pi. Bachelor thesis for the Telecommunication Technologies program on Telematics.

  2. en personas con el VIH/SIDA

    Directory of Open Access Journals (Sweden)

    Ximena Palacios Espinosa

    2006-01-01

    Full Text Available El objetivo de este estudio fue hallar la relación de la intención e ideación suicida con algunas variables sociodemográficas, las características de la enfermedad, el tratamiento antirretroviral y los aspectos piscoafectivos en personas con el VIH/SIDA que residen en Bogotá (Colombia y pertenecientes a una fundación. Para ello, se tomó una muestra de 75 pacientes con VIH positivo a quienes se evaluó a través de una entrevista semiestructurada y dos instrumentos: el inventario de depresión de Beck (IBD y la escala de Ideación Suicida (SSI. Los resultados mostraron que solo 29 personas tenían ideación suicida y 10 intención suicida: De los 10 solo 2 sujetos tenían intención después del diagnóstico. Se encontró una relación estadística significativa para ideación suicida e intención suicida con edad, estrato socioeconómico, estado civil, orientación sexual, las características de la enfermedad, el tratamiento antirretroviral y los aspectos piscoafectivos.

  3. La relazione empatica con i robot

    NARCIS (Netherlands)

    Marti, P.; Iacono, I.; Tittarelli, M.

    2013-01-01

    È possibile instaurare una relazione empatica tra un essere umano e un robot? Il presente studio valuta le soluzioni di design adottate nella progettazione di una maschera empatica, implementata su un tablet, che consente all’anziano di dialogare nell’ambiente domestico con un robot che lo assiste

  4. Sarcoma de Kaposi en paciente con SIDA

    Directory of Open Access Journals (Sweden)

    Jesús Ramón León Polanco

    2015-01-01

    Full Text Available Se presenta el caso de un paciente masculino de 33 años de edad, con antecedentes de VIH-SIDA desde hace 10 años, que se mantiene en tratamiento con antirretrovirales. Durante todo este tiempo ha presentado varios episodios de infecciones respiratorias, incluyendo tuberculosis pulmonar 5 años atrás. Acude a consulta refiriendo edemas en miembros inferiores acompañado de lesiones en piel de color violáceo de un año de evolución, previamente interpretado como linfangitis rebelde al tratamiento y que se extendió a la cara interna de los muslos y a los miembros inferiores. Con pérdida de peso, no prurito en las lesiones, fiebre, lesiones en la mucosa oral. Se determinó hemoglobina 89 g/L, leucocitos 4,5 x 109 /L, se estudiaron las funciones hepática y renales resultando normales. Radiografías de tórax y ultrasonido abdominal normales. Se realizó estudio anatomopatológico de piel que informó Sarcoma de Kaposi. Se impuso tratamiento con quimioterapia

  5. Conversazioni autobiografiche con Albino Sacco-Casamassima

    Directory of Open Access Journals (Sweden)

    Orazio Maria Valastro

    2004-03-01

    Full Text Available Nel 1948 venne Olivetti a Matera. Olivetti venne a Matera con un certo ambasciatore americano che praticamente aveva preparato o stava dando una mano per il piano Marschall, venne a Matera e mi vollero incontrare. Io sono stato chiamato dalla piazza, stavo nella piazza, era il mese di luglio, una cosa di questo genere, e andai in un bar, un bar ad angolo mi ricordo in Via Don Minzioni, dove questo Olivetti mi disse 'ma lei che cosa fa coi sassi?' 'Che cos'è questa storia?' Gli raccontai un po' che cosa facevo io con questi amici, avevamo fatto questo, insomma tutto quello che avevamo fatto nei sassi e che volevamo preparare ancora per presentare a qualcuno un piano di revisionamento dei sassi. Mi ricordo, era la prima volta che avevo visto Adriano Olivetti, ne avevo sentito parlare però non avevo mai visto quest'uomo con gli occhi celesti, minuto, coi capelli bianchi, riccioluto, con una cravatta bianca, cosa che mi fece impressione, una specie di angelo.

  6. Procesamiento de argumentos en personas con afasia

    Directory of Open Access Journals (Sweden)

    Luis Martínez

    2012-06-01

    Full Text Available En las personas con afasia se alteran diversos procesos lingüísticos. Entre las alteraciones más comunes tenemos aquellas que se producen en el procesamiento sintáctico, lo cual es evidente en el procesamiento de los argumentos. Investigaciones previas realizadas a sujetos con afasia reflejan un procesamientodeficiente de argumentos, lo cual se hace más evidente a medida que el número de argumentos aumenta. Se ha encontrado que mientras mayor es la complejidad en la estructura de la oración, los sujetos afásicos manifiestan mayores dificultades en el procesamiento de la misma. El presente estudio indaga en las dificultades que presentan los sujetos adultos con trastornos afásicos hablantes de español en el procesamiento de argumentos durante tareas de descripción. Este trabajo corrobora la evidencia de que los sujetos con afasia manifiestan un manejo deficiente en el procesamiento de argumentos en las tareas señaladas.

  7. Coriocarcinoma con metástasis pulmonar

    Directory of Open Access Journals (Sweden)

    Vicia Sánchez Abalos

    2014-05-01

    Full Text Available Se presenta el caso clínico de una fémina de 44 años de edad, con 32 semanas de embarazo, la cual fuera ingresada en la Unidad de Cuidados Intensivos del Hospital General Docente "Dr. Juan Bruno Zayas Alfonso" de Santiago de Cuba, por presentar insuficiencia respiratoria aguda como consecuencia de una sepsis. La paciente fue tratada con cefalosporina de tercera generación y ventilación mecánica no invasiva, pero se mantuvieron las características gasométricas de hipoxemia y una mala reacción terapéutica, por lo que se requirió instrumentación de las vías respiratorias y soporte hemodinámico, sin lograr regresión del cuadro clínico, lo cual condujo a un paro cardiorrespiratorio y, con ello, a la muerte. La necropsia mostró un coriocarcinoma del endometrio con metástasis pulmonar

  8. Con la testa fra le nuvole

    Directory of Open Access Journals (Sweden)

    André Greboge

    2015-06-01

    Full Text Available Partitura de Con la testa fra le nuvole, composta em 2015 para piano e harpa de pedais. Este memorial apresenta as notas sobre a obra e a organização do processo composicional, baseada em um insight composicional a partir da ideia de complexidade apresentada por James Tenney em Meta Meta-hodos (1988.

  9. REDUCCIÓN DE ÓXIDOSDE NITROGENO CON CATALIZADORES ZEOLÍTICOS INTERCAMBIADOS CON COBALTO

    Directory of Open Access Journals (Sweden)

    Enrique Alexis García Moya

    2012-10-01

    Full Text Available Se presenta un estudio sobre la reducción catalítica selectiva (RCS de NOx con metano en presencia de oxígeno en exceso con varios catalizadores a base de las zeolitas mordenita, ferrierita y ZSM-5 intercambiadas con diferentes cargas de cobalto y con las correspondientes zeolitas en forma acida. Cuando la mezcla reactiva contenía mayormente NO2 en lugar de NO, los catalizadores ácidos mostraron las más altas velocidades de formación de N2 en condiciones secas. Las mayores actividades se obtuvieron con los catalizadores Co-mordenita, siguiendo en orden de actividad los catalizadores Co-Ferrierita y Co-ZSM-5. El catalizador Co-Mordenita más activo se ensayó con una mezcla reactiva donde predominó el NO en lugar del NO2 bajo condiciones secas e hidrotérmicas y en presencia de SO2. Con la adición de 8% de agua a la mezcla de reacción se observó desactivación reversible, especialmente a bajas temperaturas. La adición de 60 ppm de SO2 disminuyó la velocidad de reacción aproximadamente a la mitad debido posiblemente al envenenamiento de algunos sitios activos.

  10. Manejo de conductos radiculares con curvatura marcada

    Directory of Open Access Journals (Sweden)

    Jorge Mario Nuñez Duran

    2013-10-01

    Full Text Available Las variaciones anatómicas en dientes con conductos que poseen dilaceraciones hacen del tratamiento de endodonciaun reto o una complicación relativa, en donde el clínico debe desarrollar toda su habilidad y el uso de instrumentosespeciales que faciliten u optimicen la terapia de conductos radiculares. La toma de radiografías previas con diferentesangulaciones y el estudio minucioso de ellas, darán una ayuda fundamental para conocer más detalladamente estacomplicación anatómica, que en algunos casos es muy frecuente. El uso de instrumental más flexible y resistentepermite llegar con mayor precisión y seguridad a la parte apical sin que se corra el riesgo de fracturar los instrumentos,limpiándolos y modelándolos en toda su extensión para poder obturarlos de una manera correcta.El uso de limas de menor calibre, precurvadas, permite acceder a la porción dilacerada de la raíz. Este es un métodoeficaz para prevenir la perdida de longitud de trabajo y evitar así las perforaciones de las raíces durante la preparación.Dentro de los errores más comunes durante la instrumentación de los conductos está la perdida de longitud detrabajo, junto con la transportación del foramen apical, ya sea de manera externa o interna. En el presente artículose menciona el uso de nuevas y mejores técnicas usadas para poder evitar este tipo de errores y se muestra un casoclínico del manejo de un molar superior con una curvatura de 40 grados que fue preparado y obturado exitosamentecon el sistema Protaper (Dentsply- maillefer.

  11. Variables socionutricionales de hogares mazahuas integrados por preescolares desnutridos con madres con obesidad y sin obesidad

    OpenAIRE

    Viridiana Vanessa Conzuelo-González

    2009-01-01

    El primer objetivo fue conocer cuántos menores de cinco años con diferentes grados de desnutrición tienen una madre con sobrepeso/obesidad/ en una comunidad indígena que vive en extrema pobreza y bajo condiciones de migración masculina internacional. El segundo fue comparar tres variables socionutricionales (ingreso familiar, educación de la madre y adecuación nutrimental de la dieta diaria) entre estos hogares y los hogares con desnutrición infantil y madres sin obesidad. Se realizó un estud...

  12. Terapias alternativas con animales para niños con necesidades especiales

    OpenAIRE

    Cea-Chueca, Aihnoa

    2014-01-01

    El presente trabajo de fin de grado consiste en la realización de un análisis y descripción de la literatura acerca de las distintas terapias animales, destinadas a niños con necesidades especiales: cómo y por qué surgieron, en qué consisten las terapias, cómo podemos utilizarlas, etc. Las terapias alternativas con animales se conocen como una alternativa terapéutica, donde se utiliza a un animal como co-terapeuta para poder desarrollar diferentes capacidades de los niños con necesidades espe...

  13. Variables socionutricionales de hogares mazahuas integrados por preescolares desnutridos con madres con obesidad y sin obesidad

    OpenAIRE

    Viridiana Vanessa Conzuelo-González; Ivonne Vizcarra-Bordi

    2009-01-01

    El primer objetivo fue conocer cuántos menores de cinco años con diferentes grados de desnutrición tienen una madre con sobrepeso/obesidad/ en una comunidad indígena que vive en extrema pobreza y bajo condiciones de migración masculina internacional. El segundo fue comparar tres variables socionutricionales (ingreso familiar, educación de la madre y adecuación nutrimental de la dieta diaria) entre estos hogares y los hogares con desnutrición infantil y madres sin obesidad. Se realizó un est...

  14. Optimización térmica y energética de la doble fachada acristalada con ventilación mecánica en clima mediterráneo

    OpenAIRE

    Cuerva Contreras, Eva

    2013-01-01

    El diseño de edificios siguiendo criterios de sostenibilidad y eficiencia energética se ha convertido en un imperativo en los países desarrollados, sobre todo a raíz de la Directiva europea 2010/31/UE sobre Eficiencia Energética en los Edificios, cuyo objetivo para el año 2019 es el de conseguir zero-emission buildings, es decir, edificios cuyo impacto sobre el entorno sea casi nulo, al ser autosuficientes energéticamente y no emitir gases de efecto invernadero. En respuesta a esta corrien...

  15. LA FORMACION DE LOS DOCENTES EN LA INTERVENCION CON ALUMNOS/AS CON DEFICIT DE ATENCION CON HIPERACTIVIDAD (TDAH

    Directory of Open Access Journals (Sweden)

    Francisco D. Fernández Martín

    2004-06-01

    Full Text Available La presencia del Trastorno por d.ficit de atención con hiperactividad (TDAH en algunos/as de nuestros/as alumnos/as ocasiona serios problemas para que estos/as se adapten al contexto escolar y sociofamiliar en el que se desenvuelven, debido a la presencia de una serie de dificultades: hiperactividad, dificultades para mantener la atenci.n, autorregular la conducta, controlarse, etc.

  16. Esporotricosis cutánea diseminada con compromiso articular en una mujer con diabetes tipo 2

    Directory of Open Access Journals (Sweden)

    Sendy Solorzano

    Full Text Available La esporotricosis diseminada es una presentación infrecuente de esta micosis. Aunque ha sido descrita en sujetos inmunocompetentes, con frecuencia existe compromiso de la inmunidad mediada por células T. Reportamos el caso de una mujer con diabetes tipo 2 no controlada que desarrolló esporotricosis cutánea diseminada. El curso de la enfermedad presentó varias complicaciones que incluyeron hepatitis secundaria a itraconazol y artritis de la rodilla con cultivo positivo para Sporothrix schenckii durante el tratamiento con solución saturada de ioduro de potasio. La discusión del caso incluye aspectos de la patogénesis de la esporotricosis diseminada y el manejo de la infección y sus complicaciones.

  17. Riesgo familiar total en familias con mujeres diagnosticadas con neoplasia de mama

    Directory of Open Access Journals (Sweden)

    Nancy Cecilia Charrys-Bravo

    2017-07-01

    Full Text Available Objetivo: Determinar el riesgo familiar total de las familias con mujeres diagnosticadas con cáncer de mama, que asisten a un centro de salud oncológico en la ciudad de Barranquilla. Materiales y Métodos: El estudio fue de tipo descriptivo, transversal con abordaje cuantitativo. Se utilizó el instrumento Riesgo Familiar Total RFT 5-33. El universo estuvo conformado por familias con mujeres diagnosticadas con cáncer en mama. La muestra fue de 41 familias que integraron a 154 miembros; se abordó el estudio de manera censal, y no por medio de una muestra, porque el acceso a la información de la totalidad de las familia fue viable. Resultados: Los resultados mostraron que las familias, en su mayoría, son de tipo 2. El 68 % de las pacientes categorizan sus familias como amenazadas, el 5 % como familias de alto riesgo y un 27 % de las familias con un bajo riesgo. Conclusiones: Los hallazgos encontrados en esta investigación son importantes para las familias, lo cual permitirá establecer acciones y actividades que logren orientar e implementar procesos de atención específicos con el propósito de cuidar a las familias para que se mantengan sanos en un nivel de bajo riesgo; además, desarrollar controles y seguimiento a aquellas familias que se encuentran en un riesgo alto de amenazas, mediante acciones de promoción y prevención de la enfermedad de una manera amplia. Por lo anterior, se deben emprender programas más agresivos de prevención y promoción, especialmente con las familias que asisten en busca de apoyo médico para este padecimiento; de esta forma, se podrán diagnosticar los casos de forma temprana y proceder al respectivo tratamiento.

  18. Materiales nanocumpuestos basados en LDPE relleno con nanotubos de carbono con potenciales propiedades bactericidas

    OpenAIRE

    Benigno Escribano, Erika

    2015-01-01

    En este trabajo, se ha seleccionado como material de estudio polietileno de baja densidad, LDPE, ya que es un polímero con múltiples aplicaciones en diversos campos. Se busca como objetivo principal, preparar y caracterizar nuevos materiales basados en LDPE con potenciales propiedades antibacterianas. Para ello, se van a estudiar dos posibles maneras de conseguirlo: La primera de ellas, consiste en realizar un procesado mecánico sobre el polietileno, concretamente, una molienda del alta en...

  19. Rabdomiolisis asociada al tratamiento con valaciclovir

    Directory of Open Access Journals (Sweden)

    Héctor Enríquez Gómez

    2012-03-01

    Full Text Available La rabdomiolisis es un efecto secundario asociado a un buen número de fármacos, entre ellos los antivirales. Describimos un caso de rabdomiolisis secundaria a valaciclovir, efecto no descrito anteriormente en laliteratura, en un contexto clínico muy especial. Se trata de un varón queingresa por un golpe de calor secundario a la realización de ejercicio físicoextremo. Durante su ingreso se comienza tratamiento con valaciclovir porun herpes nasolabial, observándose en los días siguientes una marcadaelevación de las cifras de CPK que desaparece con la suspensión del mismo. Proponemos, por tanto, que ante la administración de valaciclovir ensituaciones que puedan comportar daño mitocondrial habría que realizarmonitorización estrecha de los niveles de CPK

  20. Experiencias y aprendizajes con juegos cooperativos

    Directory of Open Access Journals (Sweden)

    Evelyn Cerdas Agüero

    2013-03-01

    Full Text Available El presente trabajo tiene como objetivo presentar experiencias y aprendizajes que  han logrado algunos grupos de docentes con los que se ha trabajado por medio de talleres de juegos cooperativos para la paz. Los talleres se han facilitado desde la actividad de extensión Aula Activa: juegos cooperativos para la Educación para la Paz que se ha implementado en el  Instituto de Estudios Latinoamericanos (IDELA desde el 2006. En este trabajo  nos enfocamos en el trabajo con docentes del Ministerio de Educación Pública (MEP de Costa Rica, proceso que deja una serie de aprendizajes actitudinales, de valores, habilidades y cognocitivos.

  1. Comunicándonos con las cosas

    Directory of Open Access Journals (Sweden)

    Miguel Delgado

    2009-09-01

    Full Text Available Tras la Web 2.0 y gracias a la colaboración entre las personas, Internet sigue creciendo y evolucionando, pero esta vez a través de los objetos. La siguiente evolución pretende que las personas puedan interactuar con las cosas de una forma inteligente mediante tecnologías ampliamente utilizadas como el teléfono móvil e Internet, y tecnologías que permitan etiquetar objetos.

  2. Bacteriemia en pacientes internados con celulitis

    Directory of Open Access Journals (Sweden)

    Juan S. Lasa

    2012-08-01

    Full Text Available La celulitis es una inflamación aguda de la dermis y tejido celular subcutáneo de causa bacteriana, que generalmente complica a heridas, úlceras y dermatosis, aunque de manera frecuente no existe sitio de entrada. Se recomienda la realización de cultivo de punción de piel y partes blandas (PPB. Los hemocultivos raramente dan resultados positivos. El objetivo de este trabajo fue determinar la prevalencia de bacteriemia en pacientes internados en nuestra institución con diagnóstico de celulitis. Se analizaron retrospectivamente los registros clínicos de los pacientes con este diagnóstico al ingreso entre junio de 2007 y marzo de 2010. Se evaluaron los datos poblacionales, presencia de comorbilidades, y resultados de los cultivos. En ese período, se internaron 140 pacientes con diagnóstico de celulitis y a todos ellos se les realizó hemocultivo y cultivos de PPB. Setenta y cuatro eran varones (52.8%. La edad promedio: 47.5 ± 19.7 años (rango 16-94. El 40% tuvo cultivos positivos de PPB, en los que el Staphylococcus aureus meticilino resistente (SAMR fue el germen más frecuentemente aislado (35.7%; la prevalencia de bacteriemia fue del 8.6%, en donde el germen más frecuente fue Streptoccocus Beta hemolítico, grupo G (33% del total de hemocultivos positivos. La bacteriemia se asoció significativamente a mayor estadía hospitalaria (10.5 ± 8.9 vs. 4.9 ± 6, p = 0.004. Se asoció con mayor riesgo de hemocultivo positivo a ser diabético, tener cultivo de PPB positivo, consumo de alcohol y/o enfermedad pulmonar obstructiva crónica.

  3. Sistema de Supervisión no Invasivo de Signos Vitales con un Robot

    OpenAIRE

    Cobos-Torres, Juan-Carlos

    2016-01-01

    En este trabajo se diseña e integra bajo ROS software robótico, un sistema para monitorización de signos vitales (SV), mediante la técnica fotopletismográfica. Este sistema es  capaz  de  medir  la  frecuencia  cardíaca  y  la frecuencia respiratoria. La información obtenida de cada signo vital es muestreada mediante una cámara digital  y  procesada  en  línea,  por  diferentes  nodos, en la  plataforma  multimodal  de  ROS.  El prototipo  fue  evaluado  y  si...

  4. ORIENTACIONES CURRICULARES CON EL ENFOQUE CTS

    Directory of Open Access Journals (Sweden)

    Miguel Corchuelo

    2010-11-01

    Full Text Available Considerando que el propósito de la educación con un enfoque CTS propende por abordar problemas contextualizados socialmente, se busca construir una propuesta desde la práctica, con el fi n de fortalecer la formación para la participación ciudadana. Encontramos que abordar el tratamiento de las relaciones entre deporte, nutrición humana y motricidad convierte al cuerpo humano en un objeto de estudio vigente. En la ciudad de Popayán (Cauca, Colombia se vive una de las más altas tasas de bulimia y anorexia en adolescentes del país, al igual que de consumo de drogas ilícitas. Además, el bajo rendimiento de los deportistas caucanos en los últimos Juegos Nacionales, los casos de dopaje en atletas olímpicos, entre otros, abre interrogantes sobre la formación integral de nuestros estudiantes. Con el fi n de acercar la escuela a estas problemáticas locales y nacionales, se asume un trabajo interdisciplinario basado en la resolución de problemas socialmente relevantes. En esta oportunidad compartiremos los resultados del camino recorrido en torno a la pregunta: “El deporte: ¿emancipación o alienación?”.

  5. Aprendiendo química con golosinas

    Directory of Open Access Journals (Sweden)

    José Manuel Rodríguez Rodríguez

    2011-01-01

    Full Text Available Las golosinas (caramelos, chicles, nubes, palotes, papas fritas, etc. nos gustan a casi todos y gozan de una imagen positiva, a pesar de sus efectos secundarios si no se consumen con moderación. Aprovechándonos de esa buena imagen y de la gran variedad de golosinas que existen en el mercado, hemos diseñado una serie de experimentos con los que podemos explicar distintos tipos de reacciones químicas (ácido-base, oxidación reducción, endotérmicas¿, la actuación de un indicador e, incluso, podemos comparar cantidades de vitamina C. En todas las actividades se persigue explicar algún aspecto de la Química que, en general, el público desconoce, captando su atención, por ejemplo, mediante cambios de color espectaculares y con las golosinas como protagonistas. Así mismo, estas experiencias pueden emplearse como recursos didácticos para alumnos de 4º E.S.O. y Bachillerato, apoyando los contenidos teóricos del currículum.

  6. Lipoatrofia semicircular: un nuevo trastorno de salud relacionado con el trabajo Semicircular lipoatrophy: a new occupational disease

    Directory of Open Access Journals (Sweden)

    Helena Pañella

    2008-02-01

    Full Text Available En febrero de 2007, una gran empresa de Barcelona notificó un brote de una rara lesión llamada lipoatrofia semicircular que afectaba a casi 200 personas de los aproximadamente 1.000 trabajadores de plantilla. En septiembre de ese mismo año se habían notificado más de 600 casos, también en otros centros de trabajo, sobre todo de Barcelona pero también del resto de España. Se realizó un estudio de casos y controles que identificó como factores de riesgo de esta lesión la baja humedad relativa del interior de los edificios y la utilización de mesas de trabajo con bordes delgados y angulares. Cuatro meses después de notificarse los primeros casos, se presentó un protocolo de actuación ante casos de lipoatrofia dirigido a los profesionales sanitarios de los servicios de prevención de las empresas y de las mutuas de accidentes de trabajo y de enfermedades profesionales. La implantación de estas medidas de control se ha traducido en una drástica reducción de la incidencia y en la curación de una proporción significativa de los casos.In February 2007, an outbreak of 200 cases of a rare condition called semicircular lipoatrophy was notified by a company of Barcelona with about 1,000 workers. In September of that year, more that 600 cases had been notified in other workplaces, most of them in Barcelona, but also in other Spanish cities. A case-control study identified the low indoor relative humidity and working tables with thin edges as risk factors. Four months after the onset of the outbreak, the guidelines for the management of similar work-related outbreaks were published. They were addressed to health care workers of occupational health services and insurance organisations of occupational injuries and professional diseases. The implementation of the recommended interventions has been followed by a dramatic reduction of the incidence of new cases as well as by the recovery of a significant proportion of cases.

  7. Calidad de vida, satisfacción con el tratamiento y bienestar emocional en pacientes con diabetes LADA

    OpenAIRE

    Granado Casas, Minerva

    2014-01-01

    Introducción: La calidad de vida, satisfacción con el tratamiento y bienestar emocional en pacientes con diabetes mellitus están relacionados con el control metabólico, las complicaciones y algunas variables socioeconómicas. Actualmente, no existe ningún estudio científico que analice la calidad de vida, satisfacción con el tratamiento y bienestar emocional en pacientes con diabetes LADA. Objetivos: Los objetivos principales fueron conocer la calidad de vida, satisfacción con el tratamient...

  8. "Sonríe con salud"

    Directory of Open Access Journals (Sweden)

    Rosa María González Ramos

    Full Text Available Introducción: los programas educativos juegan un papel importante ya que permiten modificar hábitos y conductas perjudiciales para la salud. Las personas de la tercera edad deben adquirir los conocimientos necesarios para realizar el auto cuidado de la salud bucal mejorando así su calidad de vida. Objetivo: evaluar los resultados del programa "Sonríe con salud". Métodos: se realizó una investigación descriptiva de corte transversal, con un universo de 74 personas de 60 años y más. Las variables estudiadas fueron: la edad, sexo. Se aplicó una encuesta. Las respuestas se agruparon atendiendo a si poseían o no, conocimientos acerca de la relación entre salud bucal y salud general, las principales enfermedades buco-dentales, realización del autoexamen bucal, efecto del tabaquismo y alcoholismo, ingestión de los alimentos azucarados, calientes, picantes y la importancia de la higiene bucal. La recolección de la información, la realizaron los autores empleando como fuente primaria el cuestionario aplicado en la primera etapa de la investigación. Se utilizaron los valores absolutos y el porcentaje en el análisis de los resultados. Resultados: el grupo de edad de 70 a 79 años fueron los más representados (36,5 % y el sexo femenino con un 59,5 %. Se elevaron los conocimientos relacionados con el efecto perjudicial del alcoholismo al 91,9 % y el tabaquismo al 95,9 %; acerca de la ingestión de alimentos azucarados se elevan al 97,7 % al igual que los alimentos calientes y picantes en un 90,5 %, relativo al autoexamen bucal se superan los conocimientos de su realización al 78,4 % y referente a la higiene bucal se elevan al 91,9 %. Conclusiones: el programa educativo "sonríe con salud" resultó eficaz, al elevar el nivel de conocimientos de los ancianos que recibieron las actividades previstas en el programa.

  9. Acogida de los solicitantes de asilo con discapacidad en Europa

    OpenAIRE

    Beduschi-Ortiz, Ana

    2010-01-01

    Con respecto a la acogida de los solicitantes de asilo en la Unión Europea, podemos encontrar disposiciones para la protección de las personas con discapacidad en una amplia gama de fuentes reguladoras.

  10. Red de apoyo y acompañamiento estudiantil… una práctica de integración universitaria para la reducción del abandono.

    OpenAIRE

    Gallego, Carmenza; Beatncorth, Dora Luz; Calderon, Adriana Lucia; Chalarca, Carolina; Toro, Alexandra

    2016-01-01

    La puesta en práctica de las diferentes acciones establecidas en el programa de “Permanencia con Calidad” de la Universidad de Caldas, ha generado el establecimiento de una red de apoyo y acompañamiento estudiantil, como una estrategia institucional que ayuda no sólo a entender sino a intervenir más integralmente el fenómeno de la deserción estudiantil. Dentro de los objetivos perseguidos por la red y sus cinco nodos: nodo de apoyo y acompañamiento académico, nodo de apoyo y acompañamiento a ...

  11. Factores asociados con la irregularidad de la ingesta de Dapsona en pacientes con lepra: Dapsona en pacientes con lepra

    Directory of Open Access Journals (Sweden)

    Luis Carlos Orozco Vargas

    2013-04-01

    Full Text Available Introducción: Conocer los factores asociados al cumplimiento del tratamiento en pacientes con lepra, es muy importante para prevenir la resistencia del Mycobacterium leprae y garantizar la cura bacteriológica de estas personas. La prueba de orina para Dapsona, presente en el régimen autoadministrado, es un método sencillo para establecer la regularidad del tratamiento. Objetivo: Explorar los factores asociados a la irregularidad de la ingesta del tratamiento antileproso. Métodos: Estudio de corte transversal de los enfermos que recibieron tratamiento antileproso en un centro dermatológico. La irregularidad se estableció con la prueba de dapsonuria. Se consideró irregular el que presentó la prueba negativa. Las variables sospechosas de influir en la irregularidad se analizaron con regresión logística exacta. Resultados: En el modelo final del análisis multivariado se encontraron cinco variables asociadas, entre éstas sobresalen como factores de riesgo, la ausencia de discapacidad, OR 28.56 (IC90% 1.2-2.1 y la entrega de tratamiento para tiempos mayores a un mes, por cada mes OR 3.41 (IC90% 1.4-9.2 y como factor protector, la aceptación familiar de la enfermedad OR 0.008 (IC90% 0.001-0.24. Conclusión: Aunque es posible que el pequeño tamaño de muestra no haya permitido detectar algunos factores de riesgo informados en otras investigaciones, la mayoría de esos estudios no han realizado análisis multivariado por lo cual es posible que muchos de los factores informados en la literatura no tengan importancia. Salud UIS 2013; 45 (1: 7-14

  12. Diseño y construcción de una turbina de gas para generación de baja potencia (TGBP con ciclo regenerativo a partir de un turbocargador

    Directory of Open Access Journals (Sweden)

    Cesar Eduardo Mondragón Cediel

    2010-01-01

    Full Text Available La ciudad de Cantagallo (Bolívar en Colombia requiere 21kW de energía eléctrica para suplir las necesidades de su población ya que no tiene acceso a la red de interconexión eléctrica como muchas otras ciudades del país. La aplicación de la generación distribuida a partir de turbinas de gas de baja potencia (TGBP para suplir estas necesidades es viable en Colombia, además las TGBP a partir de turbocargadores automotrices suplen completamente los requerimientos de la generación distribuida aislada y de soporte de la red de distribución en plantas, fábricas y edificios; por lo tanto se realiza el dise.o detallado y construcción de una TGBP que genera 30kW, cuyas características específicas y técnicas le permiten ser aplicable como sistema de Generación Distribuida en Colombia a partir de un turbocargador automotriz empleando el ciclo termodinámico regenerativo para disminuir  el consumo espec.fico de combustible (SFC y por lo tanto aumentar la eficiencia del ciclo, con sus respectivos sistemas de inyección de combustible, ignición, lubricación y de adquisición de datos. Se realiza una metodolog.a de dise.o de: TGBP con ciclo regenerativo, de c.maras de combusti.n tubulares y de intercambiadores de calor (recuperadores empleando fuentes bibliográficas especializadas en el desarrollo de motores a reacción a nivel mundial así como software FEA, CFD y tecnologías de fabricación asequibles y encontradas en Colombia.

  13. Empleo del método estratigráfico en el estudio de la vivienda rural vernácula construida con tierra. Un caso de aplicación en La Rioja, Argentina

    Directory of Open Access Journals (Sweden)

    Rolón, Guillermo

    2010-12-01

    Full Text Available Earthen architecture, as being study subject, began in the last quarter of the twentieth century caused by the urgent need to preserve this type of building heritage worldwide. Nowadays, its scope has significantly increased and linked with other disciplinary fields. In this article, we present the preliminary results obtained from the study of earthen historic building by using theoretical and methodological tools developed within Archaeology of Architecture. The case herein discussed is a rural dwelling which was continuously inhabited. It was built during the second half of the nineteenth century in the valley regions in La Rioja province (Argentina. The study was jointly carried out using the wall stratigraphic method, the typology of rural housing and the analysis of different construction techniques.La Arquitectura en Tierra, como campo temático específico dentro de la disciplina de Arquitectura, renace a partir del último cuarto de siglo XX impulsada por la urgente necesidad de preservar este tipo de patrimonio construido en todo el mundo. En la actualidad, su campo de acción se ha incrementado notablemente, del mismo modo que su vinculación con otras disciplinas. En este texto exponemos los resultados previos surgidos del estudio de un edificio histórico doméstico en tierra empleando herramientas teóricas y metodológicas desarrolladas en el ámbito de la Arqueología de la Arquitectura. El caso abordado corresponde a una vivienda rural popular construida durante la segunda mitad del siglo XIX en la región de los valles de la provincia argentina de La Rioja, con continuidad de uso hasta la actualidad. El estudio fue realizado empleando conjuntamente el método estratigráfico de alzados, la tipología de vivienda rural y el análisis de las diferentes técnicas constructivas.

  14. 9 CFR 319.301 - Chili con carne with beans.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Chili con carne with beans. 319.301 Section 319.301 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... Dehydrated Meat Food Products § 319.301 Chili con carne with beans. Chili con carne with beans shall contain...

  15. Insuficiencia renal aguda relacionada con medicamentos en pacientes hospitalizados

    Directory of Open Access Journals (Sweden)

    Lujan Iavecchia

    2015-11-01

    Conclusiones: La mitad de los episodios de IRA intrahospitalaria se relacionaron con medicamentos. Los pacientes con IRA relacionada con medicamentos presentaron más antecedentes patológicos cardiovasculares, pero menos factores de riesgo de IRA y una menor mortalidad.

  16. Tumor germinal mixto con componentes de disgerminoma y coriocarcinoma de ovario en mujer adolescente con ataxiatelangiectasia

    Directory of Open Access Journals (Sweden)

    Eduardo Augusto Gálvez-Cuitiva

    2015-11-01

    días. Se suspendió la quimioterapia porque desarrolló choque séptico que puso en riesgo su vida. Por su enfermedad de base permaneció bajo vigilancia. Actualmente, 17 meses después, la paciente vive sin actividad tumoral.  Conclusión: existe asociación entre ataxia-telangiectasia, leucemia y linfomas. Se describe el caso clínico de una paciente con ataxia-telangiectasia y tumor germinal mixto con componente de disgerminoma y coriocarcinoma de ovario. Se propone establecer un tratamiento especial para estos pacientes inmunocomprometidos, con alto riesgo de cáncer pero, a la vez, de no tolerar los esquemas habituales.

  17. Tratamiento de la obesidad con productos naturales

    Directory of Open Access Journals (Sweden)

    Lina Neri Espinosa Pire

    2016-12-01

    Full Text Available Los crecientes índices de obesidad alrededor del mundo, provocados principalmente por los excesos en la ingesta y la vida sedentaria, constituye uno de los grandes problemas de salud pública en nuestras sociedades. Entre otras formas como dietas y tratamientos que surgen cada día para combatir la obesidad, el uso de plantas medicinales conocido como fitoterapia, ha despertado gran interés. Existen ciertas plantas que poseen propiedades adelgazantes, sin embargo, lo mejor es ponerse en manos de especialistas en este campo, para recibir una correcta asesoría de acuerdo a las necesidades personales. Las plantas medicinales y los productos que de ellas se obtienen, constituyen remedios eficaces para combatir la obesidad, pues no tienen efectos adversos. No obstante el tratamiento debe combinarse con un cambio de hábitos alimentarios y actividad física y no conviene utilizarlos irresponsablemente, pues no todos tienen los mismos beneficios y efectos. La eficacia de la aplicación de plantas con la finalidad de bajar de peso ha sido comprobada en numerosos ensayos clínicos que se han realizado con determinadas especies vegetales. Las plantas medicinales se han utilizado tradicionalmente en forma de infusión, sin embargo esta forma de administración no permite controlar efectivamente las dosis administradas, por lo que es preferible hacerlo en preparados como cápsulas o comprimidos. Cada planta deberá administrarse de una manera específica y es importante que los preparados se tomen siempre en el mismo horario para potenciar su efectividad.

  18. Factores prenatales relacionados con la prematuridad

    Directory of Open Access Journals (Sweden)

    Guillermo Arias Macías

    2001-03-01

    Full Text Available Se estudiaron 130 madres y sus recién nacidos prematuros con su correspondiente grupo control, nacidos en el Hospital Ginecoobstétrico Provincial Docente "Justo Legón Padilla", de Pinar del Río, desde febrero hasta julio de 1998, con el objetivo de analizar algunos factores perinatales relacionados con la prematuridad. Se analizaron las variables: edad materna, paridad, peso al inicio del embarazo, talla materna, período intergenésico, edad gestacional, oligoamnios, hipertensión arterial materna y sexo del niño. Se demostró que la edad materna inferior a 17 años, la baja talla materna, el oligoamnio, la sepsis ovular y el período intergenésico de más de 5 años tuvieron resultados significativos para el nacimiento de pretérminos.130 mothers and their premature infants with their corresponding control group delivered at "Justo Legón Padilla" Provincial Gynecoobstetric Teaching Hospital, in Pinar del Río, from February to July, 1998, were studied aimed at analyzing some perinatal factors connected with prematurity. The following variables were analyzed: maternal age, parity, weight at the beginning of pregnancy, maternal height, intergenesic period, gestational age, oligohydramnios, maternal hypertension and sex of the child. It was proved that maternal age under 17, low maternal height, the oligohydramnios, vulvar sepsis and the intergenesic period of more than 5 years had significant results for the birth of preterm infants.

  19. Rescate articular con colgajo anterolateral del muslo

    Directory of Open Access Journals (Sweden)

    F.J. García-Bernal

    2015-06-01

    Full Text Available La preservación del nivel de amputación tanto de la extremidad superior como de la inferior, puede mejorar la función residual y el proceso de rehabilitación protésica de la misma. Ambas van a estar condicionadas por la longitud restante de la extremidad, la presencia o no de articulaciones operativas y la calidad de la cobertura del muñón. Presentamos 2 casos de amputaciones. El primero es un caso agudo de amputación traumática de extremidad superior a la altura del tercio proximal de antebrazo, que asocia avulsión cutánea circular desde el tercio medio del brazo y con articulación de codo conservada. El segundo, es la secuela de una amputación infracondílea de extremidad inferior por osteosarcoma que presenta fístulas cutáneas con drenaje supurativo por osteomielitis en el muñón tibial. En ambos pacientes realizamos cobertura con colgajo anterolateral de muslo anastomosado a la arteria radial en el caso de la extremidad superior, y a la arteria genicular descendente en la extremidad inferior. En los dos casos el postoperatorio transcurrió sin complicaciones, logrando preservar las articulaciones del codo y de la rodilla respectivamente, así como la posterior rehabilitación protésica. Consideramos que el colgajo anterolateral del muslo permite aportar tejido de buena calidad como cobertura del muñón de amputación. Dadas las características del tejido aportado y su volumen, es idóneo tanto para cobertura de defectos agudos como de déficits de almohadillado en casos crónicos.

  20. Proyecto innovador: “con+ciencia”

    OpenAIRE

    Fernández Arroyo, Jorge; Rodríguez Marín, Fátima; González Medina, Sara

    2013-01-01

    En esta comunicación se expone la experiencia de observación sobre el funcionamiento del proyecto Con+ciencia en los cursos de 5º y 6º de Primaria (tercer ciclo) del centro C.E.I.P. “Príncipe de Asturias” (Sevilla) durante el mes de marzo del 2013. Nuestra participación ha buscado conocer en profundidad este proyecto, observar su aplicación real en el aula y sus implicaciones en el alumnado y el profesorado.