  1. Bayesian probabilistic network approach for managing earthquake risks of cities

    DEFF Research Database (Denmark)

    Bayraktarli, Yahya; Faber, Michael

    2011-01-01

    This paper considers the application of Bayesian probabilistic networks (BPNs) to large-scale risk based decision making in regard to earthquake risks. A recently developed risk management framework is outlined which utilises Bayesian probabilistic modelling, generic indicator based risk models...... and a fourth module on the consequences of an earthquake. Each of these modules is integrated into a BPN. Special attention is given to aggregated risk, i.e. the risk contribution from assets at multiple locations in a city subjected to the same earthquake. The application of the methodology is illustrated...

  2. Bayesian probabilistic network approach for managing earthquake risks of cities

    DEFF Research Database (Denmark)

    Bayraktarli, Yahya; Faber, Michael

    2011-01-01

    This paper considers the application of Bayesian probabilistic networks (BPNs) to large-scale risk based decision making in regard to earthquake risks. A recently developed risk management framework is outlined which utilises Bayesian probabilistic modelling, generic indicator based risk models...... and geographical information systems. The proposed framework comprises several modules: A module on the probabilistic description of potential future earthquake shaking intensity, a module on the probabilistic assessment of spatial variability of soil liquefaction, a module on damage assessment of buildings...... and a fourth module on the consequences of an earthquake. Each of these modules is integrated into a BPN. Special attention is given to aggregated risk, i.e. the risk contribution from assets at multiple locations in a city subjected to the same earthquake. The application of the methodology is illustrated...

  3. Earthquake Culture: A Significant Element in Earthquake Disaster Risk Assessment and Earthquake Disaster Risk Management

    OpenAIRE

    Ibrion, Mihaela

    2018-01-01

    This book chapter brings to attention the dramatic impact of large earthquake disasters on local communities and society and highlights the necessity of building and enhancing the earthquake culture. Iran was considered as a research case study and fifteen large earthquake disasters in Iran were investigated and analyzed over more than a century-time period. It was found that the earthquake culture in Iran was and is still conditioned by many factors or parameters which are not integrated and...

  4. Global building inventory for earthquake loss estimation and risk management

    Science.gov (United States)

    Jaiswal, Kishor; Wald, David; Porter, Keith

    2010-01-01

    We develop a global database of building inventories using taxonomy of global building types for use in near-real-time post-earthquake loss estimation and pre-earthquake risk analysis, for the U.S. Geological Survey’s Prompt Assessment of Global Earthquakes for Response (PAGER) program. The database is available for public use, subject to peer review, scrutiny, and open enhancement. On a country-by-country level, it contains estimates of the distribution of building types categorized by material, lateral force resisting system, and occupancy type (residential or nonresidential, urban or rural). The database draws on and harmonizes numerous sources: (1) UN statistics, (2) UN Habitat’s demographic and health survey (DHS) database, (3) national housing censuses, (4) the World Housing Encyclopedia and (5) other literature.

  5. Engineering aspects of earthquake risk mitigation: Lessons from management of recent earthquakes, and consequential mudflows and landslides

    International Nuclear Information System (INIS)

    1992-01-01

    The Proceedings contain 30 selected presentations given at the Second and Third UNDRO/USSR Training Seminars: Engineering Aspects of Earthquake Risk Assessment and Mitigation of Losses, held in Dushanbe, October 1988; and Lessons from Management of Recent Earthquakes, and Consequential Mudflows and Landslides, held in Moscow, October 1989. The annexes to the document provide information on the participants, the work programme and the resolution adopted at each of the seminars. Refs, figs and tabs

  6. Evaluating earthquake disaster risk management in schools in Rungwe Volcanic Province in Tanzania

    Directory of Open Access Journals (Sweden)

    Evaristo Haulle

    2012-06-01

    Full Text Available This article establishes existing knowledge on earthquakes and coping mechanisms employed in reducing the severity of adverse impacts caused by an earthquake disaster in a specific locality. The purpose of the study was to recommend useful measures for disaster risk management. It also more particularly aimed at assessing mechanisms employed in reducing the disaster risk and integrating knowledge of disasters and hazards in primary and secondary school curricula. The study was carried out in Rungwe Volcanic Province in Rungwe District, Tanzania, and included recording people’s attitudes towards earthquake disaster and locations of schools. It employed focus group discussions, public hearings and interviews in order to capture the actual situation relating to risk and vulnerability assessments by the community. The study revealed high levels of risk and vulnerability to the impact of earthquakes on the part of the community, who accepted earthquakes as a normal phenomenon and therefore did not employ special measures to reduce the impact. The study showed that the community’s coping mechanisms and the extent to which disaster management knowledge has been integrated in school curricula are inadequate in addressing earthquake disasters. It is thus recommended that traditional and modern technologies be integrated in curricula and later in sustainable practices; such technologies include the belief in ‘Nyifwila’, traditional housing style and wooden housing, and non-structural planning for disaster risk management.

  7. Web-Based Real Time Earthquake Forecasting and Personal Risk Management

    Science.gov (United States)

    Rundle, J. B.; Holliday, J. R.; Graves, W. R.; Turcotte, D. L.; Donnellan, A.

    2012-12-01

    Earthquake forecasts have been computed by a variety of countries and economies world-wide for over two decades. For the most part, forecasts have been computed for insurance, reinsurance and underwriters of catastrophe bonds. One example is the Working Group on California Earthquake Probabilities that has been responsible for the official California earthquake forecast since 1988. However, in a time of increasingly severe global financial constraints, we are now moving inexorably towards personal risk management, wherein mitigating risk is becoming the responsibility of individual members of the public. Under these circumstances, open access to a variety of web-based tools, utilities and information is a necessity. Here we describe a web-based system that has been operational since 2009 at www.openhazards.com and www.quakesim.org. Models for earthquake physics and forecasting require input data, along with model parameters. The models we consider are the Natural Time Weibull (NTW) model for regional earthquake forecasting, together with models for activation and quiescence. These models use small earthquakes ('seismicity-based models") to forecast the occurrence of large earthquakes, either through varying rates of small earthquake activity, or via an accumulation of this activity over time. These approaches use data-mining algorithms combined with the ANSS earthquake catalog. The basic idea is to compute large earthquake probabilities using the number of small earthquakes that have occurred in a region since the last large earthquake. Each of these approaches has computational challenges associated with computing forecast information in real time. Using 25 years of data from the ANSS California-Nevada catalog of earthquakes, we show that real-time forecasting is possible at a grid scale of 0.1o. We have analyzed the performance of these models using Reliability/Attributes and standard Receiver Operating Characteristic (ROC) tests. We show how the Reliability and

  8. Update earthquake risk assessment in Cairo, Egypt

    Science.gov (United States)

    Badawy, Ahmed; Korrat, Ibrahim; El-Hadidy, Mahmoud; Gaber, Hanan

    2017-07-01

    The Cairo earthquake (12 October 1992; m b = 5.8) is still and after 25 years one of the most painful events and is dug into the Egyptians memory. This is not due to the strength of the earthquake but due to the accompanied losses and damages (561 dead; 10,000 injured and 3000 families lost their homes). Nowadays, the most frequent and important question that should rise is "what if this earthquake is repeated today." In this study, we simulate the same size earthquake (12 October 1992) ground motion shaking and the consequent social-economic impacts in terms of losses and damages. Seismic hazard, earthquake catalogs, soil types, demographics, and building inventories were integrated into HAZUS-MH to produce a sound earthquake risk assessment for Cairo including economic and social losses. Generally, the earthquake risk assessment clearly indicates that "the losses and damages may be increased twice or three times" in Cairo compared to the 1992 earthquake. The earthquake risk profile reveals that five districts (Al-Sahel, El Basateen, Dar El-Salam, Gharb, and Madinat Nasr sharq) lie in high seismic risks, and three districts (Manshiyat Naser, El-Waily, and Wassat (center)) are in low seismic risk level. Moreover, the building damage estimations reflect that Gharb is the highest vulnerable district. The analysis shows that the Cairo urban area faces high risk. Deteriorating buildings and infrastructure make the city particularly vulnerable to earthquake risks. For instance, more than 90 % of the estimated buildings damages are concentrated within the most densely populated (El Basateen, Dar El-Salam, Gharb, and Madinat Nasr Gharb) districts. Moreover, about 75 % of casualties are in the same districts. Actually, an earthquake risk assessment for Cairo represents a crucial application of the HAZUS earthquake loss estimation model for risk management. Finally, for mitigation, risk reduction, and to improve the seismic performance of structures and assure life safety

  9. Risk Management in Earthquakes, Financial Markets, and the Game of 21: The role of Forecasting, Nowcasting, and Timecasting

    Science.gov (United States)

    Rundle, J. B.

    2017-12-01

    Earthquakes and financial markets share surprising similarities [1]. For example, the well-known VIX index, which by definition is the implied volatility of the Standard and Poors 500 index, behaves in very similar quantitative fashion to time series for earthquake rates. Both display sudden increases at the time of an earthquake or an announcement of the US Federal Reserve Open Market Committee [2], and both decay as an inverse power of time. Both can be regarded as examples of first order phase transitions [1], and display fractal and scaling behavior associated with critical transitions, such as power-law magnitude-frequency relations in the tails of the distributions. Early quantitative investors such as Edward Thorpe and John Kelly invented novel methods to mitigate or manage risk in games of chance such as blackjack, and in markets using hedging techniques that are still in widespread use today. The basic idea is the concept of proportional betting, where the gambler/investor bets a fraction of the bankroll whose size is determined by the "edge" or inside knowledge of the real (and changing) odds. For earthquake systems, the "edge" over nature can only exist in the form of a forecast (probability of a future earthquake); a nowcast (knowledge of the current state of an earthquake fault system); or a timecast (statistical estimate of the waiting time until the next major earthquake). In our terminology, a forecast is a model, while the nowcast and timecast are analysis methods using observed data only (no model). We also focus on defined geographic areas rather than on faults, thereby eliminating the need to consider specific fault data or fault interactions. Data used are online earthquake catalogs, generally since 1980. Forecasts are based on the Weibull (1952) probability law, and only a handful of parameters are needed. These methods allow the development of real time hazard and risk estimation using cloud-based technologies, and permit the application of

  10. Role of the Internet in Anticipating and Mitigating Earthquake Catastrophes, and the Emergence of Personal Risk Management (Invited)

    Science.gov (United States)

    Rundle, J. B.; Holliday, J. R.; Donnellan, A.; Graves, W.; Tiampo, K. F.; Klein, W.

    2009-12-01

    Risks from natural and financial catastrophes are currently managed by a combination of large public and private institutions. Public institutions usually are comprised of government agencies that conduct studies, formulate policies and guidelines, enforce regulations, and make “official” forecasts. Private institutions include insurance and reinsurance companies, and financial service companies that underwrite catastrophe (“cat”) bonds, and make private forecasts. Although decisions about allocating resources and developing solutions are made by large institutions, the costs of dealing with catastrophes generally fall for the most part on businesses and the general public. Information on potential risks is generally available to the public for some hazards but not others. For example, in the case of weather, private forecast services are provided by www.weather.com and www.wunderground.com. For earthquakes in California (only), the official forecast is the WGCEP-USGS forecast, but provided in a format that is difficult for the public to use. Other privately made forecasts are currently available, for example by the JPL QuakeSim and Russian groups, but these efforts are limited. As more of the world’s population moves increasingly into major seismic zones, new strategies are needed to allow individuals to manage their personal risk from large and damaging earthquakes. Examples include individual mitigation measures such as retrofitting, as well as microinsurance in both developing and developed countries, as well as other financial strategies. We argue that the “long tail” of the internet offers an ideal, and greatly underutilized mechanism to reach out to consumers and to provide them with the information and tools they need to confront and manage seismic hazard and risk on an individual, personalized basis. Information of this type includes not only global hazard forecasts, which are now possible, but also global risk estimation. Additionally

  11. Creating a Global Building Inventory for Earthquake Loss Assessment and Risk Management

    Science.gov (United States)

    Jaiswal, Kishor; Wald, David J.

    2008-01-01

    Earthquakes have claimed approximately 8 million lives over the last 2,000 years (Dunbar, Lockridge and others, 1992) and fatality rates are likely to continue to rise with increased population and urbanizations of global settlements especially in developing countries. More than 75% of earthquake-related human casualties are caused by the collapse of buildings or structures (Coburn and Spence, 2002). It is disheartening to note that large fractions of the world's population still reside in informal, poorly-constructed & non-engineered dwellings which have high susceptibility to collapse during earthquakes. Moreover, with increasing urbanization half of world's population now lives in urban areas (United Nations, 2001), and half of these urban centers are located in earthquake-prone regions (Bilham, 2004). The poor performance of most building stocks during earthquakes remains a primary societal concern. However, despite this dark history and bleaker future trends, there are no comprehensive global building inventories of sufficient quality and coverage to adequately address and characterize future earthquake losses. Such an inventory is vital both for earthquake loss mitigation and for earthquake disaster response purposes. While the latter purpose is the motivation of this work, we hope that the global building inventory database described herein will find widespread use for other mitigation efforts as well. For a real-time earthquake impact alert system, such as U.S. Geological Survey's (USGS) Prompt Assessment of Global Earthquakes for Response (PAGER), (Wald, Earle and others, 2006), we seek to rapidly evaluate potential casualties associated with earthquake ground shaking for any region of the world. The casualty estimation is based primarily on (1) rapid estimation of the ground shaking hazard, (2) aggregating the population exposure within different building types, and (3) estimating the casualties from the collapse of vulnerable buildings. Thus, the

  12. “Shake, Rattle and Roll”: risk assessment and management for food safety during two Christchurch earthquakes

    Directory of Open Access Journals (Sweden)

    Sally Johnston

    2012-06-01

    Full Text Available Problem: Two earthquakes recently struck the Christchurch region. The 2010 earthquake in Canterbury was strong yet sustained less damage than the 2011 earthquake in Christchurch, which although not as strong, was more damaging and resulted in 185 deaths. Both required activation of a food safety response.Context: The food safety response for both earthquakes was focused on reducing the risk of gastroenteritis by limiting the use of contaminated water and food, both in households and food businesses. Additional food safety risks were identified in the 2011 Christchurch earthquake due the use of large-scale catering for rescue workers, volunteers and residents unable to return home.Action: Using a risk assessment framework, the food safety response involved providing water and food safety advice, issuing a boil water notice for the region and initiating water testing on reticulation systems. Food businesses were contacted to ensure the necessary measures were being taken. Additional action during the 2011 Christchurch earthquake response included making contact with food businesses using checklists and principles developed in the first response and having regular contact with those providing catering for large numbers.Outcome: In the 2010 earthquake in Canterbury, several cases of gastroenteritis were reported, although most resulted from person-to-person contact rather than contamination of food. There was a small increase in gastroenteritis cases following the 2011 Christchurch earthquake.Discussion: The food safety response for both earthquakes was successful in meeting the goal of ensuring that foodborne illness did not put additional pressure on hospitals or affect search and rescue efforts.

  13. Global Earthquake Total Economic Loss Risk Deciles

    Data.gov (United States)

    National Aeronautics and Space Administration — Global Earthquake Total Economic Loss Risk Deciles is a 2.5 minute grid of global earthquake total economic loss risks. A process of spatially allocating Gross...

  14. Global Earthquake Mortality Risks and Distribution

    Data.gov (United States)

    National Aeronautics and Space Administration — Global Earthquake Mortality Risks and Distribution is a 2.5 minute grid of global earthquake mortality risks. Gridded Population of the World, Version 3 (GPWv3) data...

  15. The Great Eastern Japan Earthquake and Tsunami : Facts and implications for flood risk management

    NARCIS (Netherlands)

    Jonkman, S.N.; Kolen, B.; Van Alphen, J.; Stroeks, R.; Tsimopoulou, V.

    2012-01-01

    The Great Eastern Japan Earthquake and Tsunami of March 11, 2011 can be characterized as a catastrophe. It inundated over 560 km2 of land, devastating a large number of coastal communities, causing over 19,000 casualties and huge economic damage in the Tohoku region. Due to the relatively high

  16. Multi-scale earthquake hazard and risk in the Chinese mainland and countermeasures for the preparedness, mitigation, and management: an overview

    Science.gov (United States)

    Wu, Z.; Jiang, C.; Ma, T.

    2012-12-01

    Earthquake hazard and risk in the Chinese mainland exhibit multi-scale characteristics. Temporal scales from centuries to months, spatial scales from the whole mainland to specific engineering structures, and energy scales from great disastrous earthquakes to small earthquakes causing social disturbance and economic loss, feature the complexity of earthquake disasters. Coping with such complex challenge, several research and application projects have been undertaken since recent years. Lessons and experiences of the 2008 Wenchuan earthquake contributed much to the launching and conducting of these projects. Understandings of the scientific problems and technical approaches taken in the mainstream studies in the Chinese mainland have no significant difference from those in the international scientific communities, albeit using of some of the terminologies have "cultural differences" - for instance, in the China Earthquake Administration (CEA), the terminology "earthquake forecast/prediction (study)" is generally used in a much broader sense, mainly indicating time-dependent seismic hazard at different spatio-temporal scales. Several scientific products have been produced serving the society in different forms. These scientific products have unique academic merits due to the long-term persistence feature and the forward forecast nature, which are all essential for the evaluation of the technical performance and the falsification of the scientific ideas. On the other hand, using the language of the "actor network theory (ANT)" in science studies (or the sociology of science), at present, the hierarchical "actors' network", making the science transformed to the actions of the public and government for the preparedness, mitigation, and management of multi-scale earthquake disasters, is still in need of careful construction and improvement.

  17. Global Earthquake Proportional Economic Loss Risk Deciles

    Data.gov (United States)

    National Aeronautics and Space Administration — Global Earthquake Proportional Economic Loss Risk Deciles is a 2.5 minute grid of earthquake hazard economic loss as proportions of Gross Domestic Product (GDP) per...

  18. Urban Policies and Earthquake Risk Mitigation

    International Nuclear Information System (INIS)

    Sarlo, Antonella

    2008-01-01

    The paper aims at proposing some considerations about some recent experiences of research carried out on the theme of earthquake risk mitigation and combining policies and actions of mitigation with urban development strategies. The objective was to go beyond the classical methodological approach aiming at defining a 'technical' evaluation of the earthquake risk through a procedure which can correlate the three 'components' of danger, exposure and vulnerability. These researches experiment, in terms of methodology and application, with a new category of interpretation and strategy: the so-called Struttura Urbana Minima (Minimum urban structure).Actually, the introduction of the Struttura Urbana Minima establishes a different approach towards the theme of safety in the field of earthquake risk, since it leads to a wider viewpoint, combining the building aspect of the issue with the purely urban one, involving not only town planning, but also social and managerial implications.In this sense the constituent logic of these researches is strengthened by two fundamental issues:- The social awareness of earthquake;- The inclusion of mitigation policies in the ordinary strategies for town and territory management. Three main aspects of the first point, that is of the 'social awareness of earthquake', characterize this issue and demand to be considered within a prevention policy:- The central role of the risk as a social production,- The central role of the local community consent,- The central role of the local community capability to planTherefore, consent, considered not only as acceptance, but above all as participation in the elaboration and implementation of choices, plays a crucial role in the wider issue of prevention policies.As far as the second point is concerned, the inclusion of preventive mitigation policies in ordinary strategies for the town and territory management demands the identification of criteria of choice and priorities of intervention and, as a

  19. Risk management

    OpenAIRE

    Mcmanus, John

    2009-01-01

    Few projects are completed on time, on budget, and to their original requirement or specifications. Focusing on what project managers need to know about risk in the pursuit of delivering projects, Risk Management covers key components of the risk management process and the software development process, as well as best practices for risk identification, risk planning, and risk analysis. The book examines risk planning, risk analysis responses to risk, the tracking and modelling of risks, intel...

  20. Indonesian earthquake: earthquake risk from co-seismic stress.

    Science.gov (United States)

    McCloskey, John; Nalbant, Suleyman S; Steacy, Sandy

    2005-03-17

    Following the massive loss of life caused by the Sumatra-Andaman earthquake in Indonesia and its tsunami, the possibility of a triggered earthquake on the contiguous Sunda trench subduction zone is a real concern. We have calculated the distributions of co-seismic stress on this zone, as well as on the neighbouring, vertical strike-slip Sumatra fault, and find an increase in stress on both structures that significantly boosts the already considerable earthquake hazard posed by them. In particular, the increased potential for a large subduction-zone event in this region, with the concomitant risk of another tsunami, makes the need for a tsunami warning system in the Indian Ocean all the more urgent.

  1. Earthquake Hazard and Risk in New Zealand

    Science.gov (United States)

    Apel, E. V.; Nyst, M.; Fitzenz, D. D.; Molas, G.

    2014-12-01

    To quantify risk in New Zealand we examine the impact of updating the seismic hazard model. The previous RMS New Zealand hazard model is based on the 2002 probabilistic seismic hazard maps for New Zealand (Stirling et al., 2002). The 2015 RMS model, based on Stirling et al., (2012) will update several key source parameters. These updates include: implementation a new set of crustal faults including multi-segment ruptures, updating the subduction zone geometry and reccurrence rate and implementing new background rates and a robust methodology for modeling background earthquake sources. The number of crustal faults has increased by over 200 from the 2002 model, to the 2012 model which now includes over 500 individual fault sources. This includes the additions of many offshore faults in northern, east-central, and southwest regions. We also use the recent data to update the source geometry of the Hikurangi subduction zone (Wallace, 2009; Williams et al., 2013). We compare hazard changes in our updated model with those from the previous version. Changes between the two maps are discussed as well as the drivers for these changes. We examine the impact the hazard model changes have on New Zealand earthquake risk. Considered risk metrics include average annual loss, an annualized expected loss level used by insurers to determine the costs of earthquake insurance (and premium levels), and the loss exceedance probability curve used by insurers to address their solvency and manage their portfolio risk. We analyze risk profile changes in areas with large population density and for structures of economic and financial importance. New Zealand is interesting in that the city with the majority of the risk exposure in the country (Auckland) lies in the region of lowest hazard, where we don't have a lot of information about the location of faults and distributed seismicity is modeled by averaged Mw-frequency relationships on area sources. Thus small changes to the background rates

  2. Managing in-country transportation risks in humanitarian supply chains by logistics service providers: Insights from the 2015 Nepal earthquake

    OpenAIRE

    Baharmand, Hossein; Comes, Tina; Lauras, Matthieu

    2017-01-01

    Humanitarian supply chains (HSCs) play a central role in effective and efficient disaster relief operations. Transportation has a critical share in HSCs and managing its risks helps to avoid further disruptions in relief operations. However, there is no common approach to or culture of risk management that its applicability has been studied through recent cases. This paper incorporates an empirical research design and makes a threefold contribution: first, it identifies in-country transportat...

  3. Development of an earthquake catalog management program

    International Nuclear Information System (INIS)

    Eum, H. S.; Choi, I. K.

    1999-01-01

    Earthquake Catalog Management Program was developed for earthquake engineering and research. The program is composed of catalog database and application program. Catalog database currently has more than 720 catalog records from earthquake data recorded between 1994/12 and 1998/5 in korea. 17 parameters derived from earthquake data constitute each record. These parameters in database include information on the triggering events, recording station, and station specific recorded values. Catalog database also has information on 12 recording stations. Application program is a tool for accessing and managing the catalog database and recorded earthquake data files. The program provides various functions such as search, sort, display capabilities of catalog subset, file retrieval from hard disks or CD-ROM, file type conversion, and multiple output options including computer screen, printer, and disk files

  4. The Relationship between Knowledge and Attitude of Managers with Preparedness of Healthcare Centers in Rey Health Network against Earthquake Risk - 2013

    Directory of Open Access Journals (Sweden)

    Mohammad Asadzadeh

    2014-06-01

    Conclusions: Considering that managers’ knowledge was rather low, preparedness among centers was low as well. According to low knowledge and unsuitable preparedness, more theoretical and practical trainings and maneuvers were necessary to be held for managers about earthquake preparedness.

  5. The last mile: earthquake risk mitigation assistance in developing countries.

    Science.gov (United States)

    Shah, Haresh C

    2006-08-15

    Over the past few decades, we have seen many joint programmes between developed countries and developing countries to help the latter in managing their earthquake risks. These programmes span the whole spectrum of disciplines from seismology and geology to engineering, social science and economics. Many of these programmes have been effective in raising awareness, in urging governments to work towards risk reduction and in spawning an 'industry' of disaster management in many of the developing countries. However, even as these efforts proceed, we have seen death and destruction due to earthquake after earthquake in developing countries, strongly suggesting that the problems for which those assistance programmes were developed are not so effective. Therefore, it is natural to ask why this is happening. Are the assistance programmes reaching the right people? Maybe we are reaching the right people and doing the right type of things in these countries, but we have not allowed enough time for our actions to take effect. Maybe we are reaching the right people and doing the right actions for most of the miles we need to cover in helping communities mitigate their earthquake risks. However, the issue could be whether we are reaching people who represent the 'last mile' on this pathway. Here, I explore whether the work that many organizations and countries have done towards earthquake risk reduction over the past few decades in developing countries is appropriate or not. Why do we keep seeing the catastrophes of Sumatra, Chi Chi, Bhuj, Turkey, Algeria and on and on? I will articulate what I think is the problem. My contribution is intended to generate discussions, self-analysis of our approaches, what we are doing right and what we are not doing right. Hopefully such discussions will result in a better connection between the last mile and programmes around the world which are working towards earthquake risk mitigation.

  6. Initiatives to Reduce Earthquake Risk of Developing Countries

    Science.gov (United States)

    Tucker, B. E.

    2008-12-01

    The seventeen-year-and-counting history of the Palo Alto-based nonprofit organization GeoHazards International (GHI) is the story of many initiatives within a larger initiative to increase the societal impact of geophysics and civil engineering. GHI's mission is to reduce death and suffering due to earthquakes and other natural hazards in the world's most vulnerable communities through preparedness, mitigation and advocacy. GHI works by raising awareness in these communities about their risk and about affordable methods to manage it, identifying and strengthening institutions in these communities to manage their risk, and advocating improvement in natural disaster management. Some of GHI's successful initiatives include: (1) creating an earthquake scenario for Quito, Ecuador that describes in lay terms the consequences for that city of a probable earthquake; (2) improving the curricula of Pakistani university courses about seismic retrofitting; (3) training employees of the Public Works Department of Delhi, India on assessing the seismic vulnerability of critical facilities such as a school, a hospital, a police headquarters, and city hall; (4) assessing the vulnerability of the Library of Tibetan Works and Archives in Dharamsala, India; (5) developing a seismic hazard reduction plan for a nonprofit organization in Kathmandu, Nepal that works to manage Nepal's seismic risk; and (6) assisting in the formulation of a resolution by the Council of the Organization for Economic Cooperation and Development (OECD) to promote school earthquake safety among OECD member countries. GHI's most important resource, in addition to its staff and Board of Trustees, is its members and volunteer advisors, who include some of the world's leading earth scientists, earthquake engineers, urban planners and architects, from the academic, public, private and nonprofit sectors. GHI is planning several exciting initiatives in the near future. One would oversee the design and construction of

  7. INTEGRATED FRAMEWORK FOR ENHANCING EARTHQUAKE RISK MITIGATION DECISIONS

    Directory of Open Access Journals (Sweden)

    Temitope Egbelakin

    2015-12-01

    Full Text Available The increasing scale of losses from earthquake disasters has reinforced the need for property owners to become proactive in seismic risk reduction programs. However, despite advancement in seismic design methods and legislative frameworks, building owners are found unwilling or lack motivation to adopt adequate mitigation measures that will reduce their vulnerability to earthquake disasters. Various theories and empirical findings have been used to explain the adoption of protective behaviours including seismic mitigation decisions, but their application has been inadequate to enhance building owners’ protective decisions. A holistic framework that incorporates the motivational orientations of decision-making, coupled with the social, cultural, economic, regulatory, institutional and political realms of earthquake risk mitigation to enhance building owners’ decisions to voluntarily implement adequate mitigation measures, is proposed. This framework attempts to address any multi-disciplinary barriers that exist in earthquake disaster management, by ensuring that stakeholders involved in seismic mitigation decisions work together to foster seismic rehabilitation of EPBs, as well as illuminate strategies that will initiate, promote and sustain the adoption of long-term earthquake mitigation. .

  8. Earthquake risk assessment of building structures

    International Nuclear Information System (INIS)

    Ellingwood, Bruce R.

    2001-01-01

    During the past two decades, probabilistic risk analysis tools have been applied to assess the performance of new and existing building structural systems. Structural design and evaluation of buildings and other facilities with regard to their ability to withstand the effects of earthquakes requires special considerations that are not normally a part of such evaluations for other occupancy, service and environmental loads. This paper reviews some of these special considerations, specifically as they pertain to probability-based codified design and reliability-based condition assessment of existing buildings. Difficulties experienced in implementing probability-based limit states design criteria for earthquake are summarized. Comparisons of predicted and observed building damage highlight the limitations of using current deterministic approaches for post-earthquake building condition assessment. The importance of inherent randomness and modeling uncertainty in forecasting building performance is examined through a building fragility assessment of a steel frame with welded connections that was damaged during the Northridge Earthquake of 1994. The prospects for future improvements in earthquake-resistant design procedures based on a more rational probability-based treatment of uncertainty are examined

  9. Risk management.

    Science.gov (United States)

    Chambers, David W

    2010-01-01

    Every plan contains risk. To proceed without planning some means of managing that risk is to court failure. The basic logic of risk is explained. It consists in identifying a threshold where some corrective action is necessary, the probability of exceeding that threshold, and the attendant cost should the undesired outcome occur. This is the probable cost of failure. Various risk categories in dentistry are identified, including lack of liquidity; poor quality; equipment or procedure failures; employee slips; competitive environments; new regulations; unreliable suppliers, partners, and patients; and threats to one's reputation. It is prudent to make investments in risk management to the extent that the cost of managing the risk is less than the probable loss due to risk failure and when risk management strategies can be matched to type of risk. Four risk management strategies are discussed: insurance, reducing the probability of failure, reducing the costs of failure, and learning. A risk management accounting of the financial meltdown of October 2008 is provided.

  10. Extreme Earthquake Risk Estimation by Hybrid Modeling

    Science.gov (United States)

    Chavez, M.; Cabrera, E.; Ashworth, M.; Garcia, S.; Emerson, D.; Perea, N.; Salazar, A.; Moulinec, C.

    2012-12-01

    The estimation of the hazard and the economical consequences i.e. the risk associated to the occurrence of extreme magnitude earthquakes in the neighborhood of urban or lifeline infrastructure, such as the 11 March 2011 Mw 9, Tohoku, Japan, represents a complex challenge as it involves the propagation of seismic waves in large volumes of the earth crust, from unusually large seismic source ruptures up to the infrastructure location. The large number of casualties and huge economic losses observed for those earthquakes, some of which have a frequency of occurrence of hundreds or thousands of years, calls for the development of new paradigms and methodologies in order to generate better estimates, both of the seismic hazard, as well as of its consequences, and if possible, to estimate the probability distributions of their ground intensities and of their economical impacts (direct and indirect losses), this in order to implement technological and economical policies to mitigate and reduce, as much as possible, the mentioned consequences. Herewith, we propose a hybrid modeling which uses 3D seismic wave propagation (3DWP) and neural network (NN) modeling in order to estimate the seismic risk of extreme earthquakes. The 3DWP modeling is achieved by using a 3D finite difference code run in the ~100 thousands cores Blue Gene Q supercomputer of the STFC Daresbury Laboratory of UK, combined with empirical Green function (EGF) techniques and NN algorithms. In particular the 3DWP is used to generate broadband samples of the 3D wave propagation of extreme earthquakes (plausible) scenarios corresponding to synthetic seismic sources and to enlarge those samples by using feed-forward NN. We present the results of the validation of the proposed hybrid modeling for Mw 8 subduction events, and show examples of its application for the estimation of the hazard and the economical consequences, for extreme Mw 8.5 subduction earthquake scenarios with seismic sources in the Mexican

  11. Ecological Management and the Cosmogenic Mechanism of Earthquakes

    Directory of Open Access Journals (Sweden)

    Mogiljuk Zhanna

    2016-01-01

    Full Text Available Critical issue of ecological risk management in urban areas is to predict the evolution of the dangerous natural processes intensity. The special situation in the realization of these risks take the earthquake threat and the stresses emergency fluctuations in the geological environment of the buildings and structures bases. This article is devoted to one of the main problems of earthquake engineering - verification of the dominant mechanisms and causality of the earthquakes intensity dangerous evolution. In it discusses the comparative analysis results of the Earth gravitational interaction energy variations amplitudes with the Sun, with the Moon and the solar system planets. Also presented the comparative evaluations results of the Earth geospheres gravitational perturbations amplitudes with the Earth solar radiation energy with the energy of its own heat of the Earth. It is shown that the energy of his own heat and Sun exposure of the Earth much less energy to gravitational perturbations in the near-earth space. In the article presents the spectral analysis results of earthquakes global daily energy on the Earth before and after the Shoemaker-Levy comet explosion on Jupiter. It is shown that the seismic events number on Earth with magnitude greater than 2.5 on the Richter scale after the comet explosion increased in 10 times. In the earthquakes global daily energy spectrum shows the spectral manifestations of solar system planets gravitational resonances. In given article the researches results of natural disasters cosmogenic sources power allow us to argue that ecological risk effective management is impossible without the evolution forecast of the cosmogenic effects intensity on natural processes for sustainable urban development.

  12. Vrancea earthquakes. Courses for specific actions to mitigate seismic risk

    International Nuclear Information System (INIS)

    Marmureanu, Gheorghe; Marmureanu, Alexandru

    2005-01-01

    Earthquakes in the Carpathian-Pannonian region are confined to the crust, except the Vrancea zone, where earthquakes with focal depth down to 200 Km occur. For example, the ruptured area migrated from 150 km to 180 km (November 10,1940, M w = 7.7) from 90 km to 110 km (March 4, 1977, M w 7.4), from 130 km to 150 km (August 30, 1986, M w = 7.1) and from 70 km to 90 km (May 30, 1990, M w = 6.9) depth. The depth interval between 110 km and 130 km remains not ruptured since 1802, October 26, when it was the strongest earthquake occurred in this part of Central Europe. The magnitude is assumed to be M w = 7.9 - 8.0 and this depth interval is a natural candidate for the next strong Vrancea event. While no country in the world is entirely safe, the lack of capacity to limit the impact of seismic hazards remains a major burden for all countries and while the world has witnessed an exponential increase in human and material losses due to natural disasters given by earthquakes, there is a need to reverse trends in seismic risk mitigation to future events. Main courses for specific actions to mitigate the seismic risk given by strong deep Vrancea earthquakes should be considered as key for development actions: - Early warning system for industrial facilities. Early warning is more than a technological instrument to detect, monitor and submit warnings. It should become part of a management information system for decision-making in the context of national institutional frameworks for disaster management and part of national and local strategies and programmers for risk mitigation; - Prediction program of Vrancea strong earthquakes of short and long term; - Hazard seismic map of Romania. The wrong assessment of the seismic hazard can lead to dramatic situations as those from Bucharest or Kobe. Before the 1977 Vrancea earthquake, the city of Bucharest was designed to intensity I = VII (MMI) and the real intensity was I = IX1/2-X (MMI); - Seismic microzonation of large populated

  13. Vrancea earthquakes. Specific actions to mitigate seismic risk

    International Nuclear Information System (INIS)

    Marmureanu, Gheorghe; Marmureanu, Alexandru

    2005-01-01

    natural disasters given by earthquakes, there is a need to reverse trends in seismic risk mitigation to future events. Main courses of specific action to mitigate the seismic risks from strong deep Vrancea earthquakes should be considered as key to future development projects, including: - Early warning system for industrial facilities; - Short and long term prediction program of strong Vrancea earthquakes; - Seismic hazard map of Romania; - Seismic microzonation of large populated cities; - Shake map; - Seismic tomography of dams for avoiding disasters. The quality of life and the security of infrastructure (including human services, civil and industrial structures, financial infrastructure, information transmission and processing systems) in every nation are increasingly vulnerable to disasters caused by events that have geological, atmospheric, hydrologic, and technological origins. As UN Secretary General Kofi Annan pointed out, 'Building a culture of prevention is not easy. While the costs of prevention have to be paid in the present, its benefits lie in a distant future'. In other words: Prevention pays off. This may not always become apparent immediately, but, in the long run, the benefits from prevention measures will always outweigh their costs by far. Romania is an earthquake prone area and these main specific actions are really contributing to seismic risk mitigation. These specific actions are provided for in Law nr. 372/March 18,2004 -'The National Program of Seismic Risk Management'. (authors)

  14. Managing Risks

    DEFF Research Database (Denmark)

    Alaranta, Maria Eliisa; Mathiassen, Lars

    2014-01-01

    Mergers and acquisitions (M&A) require organizations to blend together different information system (IS) configurations. Unfortunately, less than 50 percent of M&A's achieve their goals, with IS integration being a major problem. Here, the authors offer a framework to help managers prepare for......, analyze, and mitigate risks during post-merger IS integration. They identify key risks relating to IS integration content, process, and context, and present five strategies for mitigating those risks. Their framework aims to help managers proactively reduce the impact of adverse events. Adopting...... the framework supported by their templates is straightforward and the time and resources required are minimal. When properly executed, adoption increases the likelihood of successful merger outcomes; the framework is thus a valuable addition to the management tool box and can be applied in collaboration...

  15. Magnitudes and frequencies of earthquakes in relation to seismic risk

    International Nuclear Information System (INIS)

    Sharma, R.D.

    1989-01-01

    Estimating the frequencies of occurrence of earthquakes of different magnitudes on a regional basis is an important task in estimating seismic risk at a construction site. Analysis of global earthquake data provides an insight into the magnitudes frequency relationship in a statistical manner. It turns out that, whereas a linear relationship between the logarithm of earthquake occurrence rates and the corresponding earthquake magnitudes fits well in the magnitude range between 5 and 7, a second degree polynomial in M, the earthquake magnitude provides a better description of the frequencies of earthquakes in a much wider range of magnitudes. It may be possible to adopt magnitude frequency relation for regions, for which adequate earthquake data are not available, to carry out seismic risk calculations. (author). 32 refs., 8 tabs., 7 figs

  16. Burden and Management of Noncommunicable Diseases After Earthquakes and Tsunamis.

    Science.gov (United States)

    Suneja, Amit; Gakh, Maxim; Rutkow, Lainie

    This integrative review examines extant literature assessing the burden and management of noncommunicable diseases 6 months or more after earthquakes and tsunamis. We conducted an integrative review to identify and characterize the strength of published studies about noncommunicable disease-specific outcomes and interventions at least 6 months after an earthquake and/or tsunami. We included disasters that occurred from 2004 to 2016. We focused primarily on the World Health Organization noncommunicable disease designations to define chronic disease, but we also included chronic renal disease, risk factors for noncommunicable diseases, and other chronic diseases or symptoms. After removing duplicates, our search yielded 6,188 articles. Twenty-five articles met our inclusion criteria, some discussing multiple noncommunicable diseases. Results demonstrate that existing medical conditions may worsen and subsequently improve, new diseases may develop, and risk factors, such as weight and cholesterol levels, may increase for several years after an earthquake and/or tsunami. We make 3 recommendations for practitioners and researchers: (1) plan for noncommunicable disease management further into the recovery period of disaster; (2) increase research on the burden of noncommunicable diseases, the treatment modalities employed, resulting population-level outcomes in the postdisaster setting, and existing models to improve stakeholder coordination and action regarding noncommunicable diseases after disasters; and (3) coordinate with preexisting provision networks, especially primary care.

  17. Earthquake Disaster Risk Index for Cities: Baku, Yerevan, Tbilisi

    International Nuclear Information System (INIS)

    Varazanashvili, O.; Mammadli, T.; Nazaretyan, S.

    2005-01-01

    For comparative analysis of seismic risk in the capitals of the South Caucasian States - Baku, Yerevan and Tbilisi - the methodology of determination of earthquake disaster risk index (EDRI) has been used. Earthquake disaster risk indexes have been determined for considered cities. EDRI-analysis is performed, some peculiarities of main risk factors are revealed and risk portraits are made in each city of the given sample. (author)

  18. Global Earthquake Mortality Risks and Distribution

    Data.gov (United States)

    National Aeronautics and Space Administration — Global Earthquake Hazard Frequency and Distribution is a 2.5 minute grid utilizing Advanced National Seismic System (ANSS) Earthquake Catalog data of actual...

  19. Seismicity and earthquake risk in western Sicily

    Directory of Open Access Journals (Sweden)

    P. COSENTINO

    1978-06-01

    Full Text Available The seismicity and the earthquake risk in Western Sicily are here
    evaluated on the basis of the experimental data referring to the historical
    and instrumentally recorded earthquakes in this area (from 1248
    up to 1968, which have been thoroughly collected, analyzed, tested and
    normalized in order to assure the quasi-stationarity of the series of
    events.
    The approximated magnitude values — obtained by means of a compared
    analysis of the magnitude and epicentral intensity values of the
    latest events — have allowed to study the parameters of the frequency-
    magnitude relation with both the classical exponential model and
    the truncated exponential one previously proposed by the author.
    So, the basic parameters, including the maximum possible regional
    magnitude, have been estimated by means of different procedures, and
    their behaviours have been studied as functions of the threshold magnitude.

  20. Change of risk information disclosure in annual report. Before and after earthquake disaster

    International Nuclear Information System (INIS)

    Ueno, Takefumi

    2011-01-01

    This research examines how risk information disclosure is changing in annual report before and after East Japan Great Earthquake Disaster. Company voluntary disclose risk information in annual report. Manager can decide a style and items of risk information. This paper explores risk information disclosures of Tokyo Electric Power Company, Chubu Power Electric Company, Kansai Electric Power Company and Toyota Motor Corporation. The managers except Tokyo Electric Company are likely to disclose own catastrophe risk before the disaster. However, they do not try to reduce their risk. Corporations' risk information do not link with own risk management. (author)

  1. The earthquake/seismic risk, vulnerability and capacity profile for ...

    African Journals Online (AJOL)

    The study was carried out to understand the risks posed by earthquakes in Karonga based on roles and perception of stakeholders. Information was collected from several stakeholders who were found responding to earthquakes impacts in Karonga Town. The study found that several stakeholders, governmental and ...

  2. Managing risks

    International Nuclear Information System (INIS)

    Nathwani, J.S.

    1993-01-01

    The three principles to guide regulating authorities are: Risks shall be managed to maximize the total expected net benefit to society; The safety benefit to be promoted is quality-adjusted life expectancy; Decisions for the public in regard to health and safety must be open and apply across the entire range of hazards to life and health. Based on the principle that excessive spending on health and safety, or lack of necessary development, may cause poverty and thereby actually decrease (adjusted) life expectancy, the author has developed a Life Product Index which gives comparable results to the Human Development Index promoted by the United Nations Development Program. These two social indicators can be used for purposes such as project evaluation, choosing between alternative technologies, or evaluation of health and safety programs

  3. Challenges to communicate risks of human-caused earthquakes

    Science.gov (United States)

    Klose, C. D.

    2014-12-01

    The awareness of natural hazards has been up-trending in recent years. In particular, this is true for earthquakes, which increase in frequency and magnitude in regions that normally do not experience seismic activity. In fact, one of the major concerns for many communities and businesses is that humans today seem to cause earthquakes due to large-scale shale gas production, dewatering and flooding of mines and deep geothermal power production. Accordingly, without opposing any of these technologies it should be a priority of earth scientists who are researching natural hazards to communicate earthquake risks. This presentation discusses the challenges that earth scientists are facing to properly communicate earthquake risks, in light of the fact that human-caused earthquakes are an environmental change affecting only some communities and businesses. Communication channels may range from research papers, books and class room lectures to outreach events and programs, popular media events or even social media networks.

  4. Statistical aspects and risks of human-caused earthquakes

    Science.gov (United States)

    Klose, C. D.

    2013-12-01

    The seismological community invests ample human capital and financial resources to research and predict risks associated with earthquakes. Industries such as the insurance and re-insurance sector are equally interested in using probabilistic risk models developed by the scientific community to transfer risks. These models are used to predict expected losses due to naturally occurring earthquakes. But what about the risks associated with human-caused earthquakes? Such risk models are largely absent from both industry and academic discourse. In countries around the world, informed citizens are becoming increasingly aware and concerned that this economic bias is not sustainable for long-term economic growth, environmental and human security. Ultimately, citizens look to their government officials to hold industry accountable. In the Netherlands, for example, the hydrocarbon industry is held accountable for causing earthquakes near Groningen. In Switzerland, geothermal power plants were shut down or suspended because they caused earthquakes in canton Basel and St. Gallen. The public and the private non-extractive industry needs access to information about earthquake risks in connection with sub/urban geoengineeing activities, including natural gas production through fracking, geothermal energy production, carbon sequestration, mining and water irrigation. This presentation illuminates statistical aspects of human-caused earthquakes with respect to different geologic environments. Statistical findings are based on the first catalog of human-caused earthquakes (in Klose 2013). Findings are discussed which include the odds to die during a medium-size earthquake that is set off by geomechanical pollution. Any kind of geoengineering activity causes this type of pollution and increases the likelihood of triggering nearby faults to rupture.

  5. Earthquake insurance pricing: a risk-based approach.

    Science.gov (United States)

    Lin, Jeng-Hsiang

    2018-04-01

    Flat earthquake premiums are 'uniformly' set for a variety of buildings in many countries, neglecting the fact that the risk of damage to buildings by earthquakes is based on a wide range of factors. How these factors influence the insurance premiums is worth being studied further. Proposed herein is a risk-based approach to estimate the earthquake insurance rates of buildings. Examples of application of the approach to buildings located in Taipei city of Taiwan were examined. Then, the earthquake insurance rates for the buildings investigated were calculated and tabulated. To fulfil insurance rating, the buildings were classified into 15 model building types according to their construction materials and building height. Seismic design levels were also considered in insurance rating in response to the effect of seismic zone and construction years of buildings. This paper may be of interest to insurers, actuaries, and private and public sectors of insurance. © 2018 The Author(s). Disasters © Overseas Development Institute, 2018.

  6. Crisis management aspects of bam catastrophic earthquake: review article.

    Science.gov (United States)

    Sadeghi-Bazargani, Homayoun; Azami-Aghdash, Saber; Kazemi, Abdolhassan; Ziapour, Behrad

    2015-01-01

    Bam earthquake was the most catastrophic natural disasters in recent years. The aim of this study was to review different aspects of crisis management during and after the catastrophic earthquake in Bam City, Iran. Data needed for this systematic review were collected through searching PubMed, EMBASE and SID databases, for the period from 2003 to 2011. Keywords included earthquake, Iran and Bam earthquake. The data were summarized and were analyzed using Content Analysis. Out of 422 articles, 25 articles were included in the study. Crisis Management aspects and existing pitfalls were classified into seven categories including planning and organization, human resource management, management of logistics, international humanitarian aids, field performance of the military and security forces, health and medical service provision, and information management. Positive aspects and major pitfalls of crisis management have been introduced in all the mentioned categories. The available evidence indicated poor crisis management during Bam earthquake that resulted in aggravating the losses as well as diminishing the effect of interventions. Thus, concerning the importance of different aspects of the crisis management and the high prevalence of disasters in Iran, the observed vulnerability in disaster management process should be addressed.

  7. Risk management

    International Nuclear Information System (INIS)

    Magne, L.

    1999-01-01

    There is always a risk of an accident occurring at a nuclear power plant, however small. The problem lies in estimating the probability of it occurring. The method of probabilistic safety assessment provides this estimate, and by identifying the sources of potential risk, makes it possible to prevent them from occurring. It is not, however, a substitute for other decision-making processes. (author)

  8. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  9. Earthquakes

    Science.gov (United States)

    An earthquake happens when two blocks of the earth suddenly slip past one another. Earthquakes strike suddenly, violently, and without warning at any time of the day or night. If an earthquake occurs in a populated area, it may cause ...

  10. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  11. Seismology: earthquake risk on the Sunda trench.

    Science.gov (United States)

    Nalbant, Suleyman S; Steacy, Sandy; Sieh, Kerry; Natawidjaja, Danny; McCloskey, John

    2005-06-09

    On 28 March 2005 the Sunda megathrust in Indonesia ruptured again, producing another great earthquake three months after the previous one. The rupture was contiguous with that of the December 2004 Sumatra-Andaman earthquake, and is likely to have been sparked by local stress, although the triggering stresses at its hypocentre were very small - of the order of just 0.1 bar. Calculations show that stresses imposed by the second rupture have brought closer to failure the megathrust immediately to the south, under the Batu and Mentawai islands, and have expanded the area of increased stress on the Sumatra fault. Palaeoseismologic studies show that the Mentawai segment of the Sunda megathrust is well advanced in its seismic cycle and is therefore a good candidate for triggered failure.

  12. Earthquake Hazard and Risk Assessment based on Unified Scaling Law for Earthquakes: Altai-Sayan Region

    Science.gov (United States)

    Kossobokov, V. G.; Nekrasova, A.

    2017-12-01

    We continue applying the general concept of seismic risk analysis in a number of seismic regions worldwide by constructing regional seismic hazard maps based on morphostructural analysis, pattern recognition, and the Unified Scaling Law for Earthquakes, USLE, which generalizes the Gutenberg-Richter relationship making use of naturally fractal distribution of earthquake sources of different size in a seismic region. The USLE stands for an empirical relationship log10N(M, L) = A + B·(5 - M) + C·log10L, where N(M, L) is the expected annual number of earthquakes of a certain magnitude M within an seismically prone area of linear dimension L. We use parameters A, B, and C of USLE to estimate, first, the expected maximum credible magnitude in a time interval at seismically prone nodes of the morphostructural scheme of the region under study, then map the corresponding expected ground shaking parameters (e.g. peak ground acceleration, PGA, or macro-seismic intensity etc.). After a rigorous testing against the available seismic evidences in the past (usually, the observed instrumental PGA or the historically reported macro-seismic intensity), such a seismic hazard map is used to generate maps of specific earthquake risks for population, cities, and infrastructures (e.g., those based on census of population, buildings inventory, etc.). This, USLE based, methodology of seismic hazard and risks assessment is applied to the territory of Altai-Sayan Region, of Russia. The study supported by the Russian Science Foundation Grant No. 15-17-30020.

  13. Earthquakes.

    Science.gov (United States)

    Pakiser, Louis C.

    One of a series of general interest publications on science topics, the booklet provides those interested in earthquakes with an introduction to the subject. Following a section presenting an historical look at the world's major earthquakes, the booklet discusses earthquake-prone geographic areas, the nature and workings of earthquakes, earthquake…

  14. Global risk of big earthquakes has not recently increased.

    Science.gov (United States)

    Shearer, Peter M; Stark, Philip B

    2012-01-17

    The recent elevated rate of large earthquakes has fueled concern that the underlying global rate of earthquake activity has increased, which would have important implications for assessments of seismic hazard and our understanding of how faults interact. We examine the timing of large (magnitude M≥7) earthquakes from 1900 to the present, after removing local clustering related to aftershocks. The global rate of M≥8 earthquakes has been at a record high roughly since 2004, but rates have been almost as high before, and the rate of smaller earthquakes is close to its historical average. Some features of the global catalog are improbable in retrospect, but so are some features of most random sequences--if the features are selected after looking at the data. For a variety of magnitude cutoffs and three statistical tests, the global catalog, with local clusters removed, is not distinguishable from a homogeneous Poisson process. Moreover, no plausible physical mechanism predicts real changes in the underlying global rate of large events. Together these facts suggest that the global risk of large earthquakes is no higher today than it has been in the past.

  15. Great Hanshin-Awaji earthquake and earthquake insurance on dwelling risks in Japan; Hanshin Awaji daishinsai to jishin hoken

    Energy Technology Data Exchange (ETDEWEB)

    Tawa, J. [The Marine and Fire Insurance Association of Japan, Tokyo (Japan)

    1996-02-15

    Japan is well-known as one of the earthquake countries. Although necessity of the earthquake insurance has been pointed out vigorously, it has not come out into the world due to the specialty of earthquake risk. Since the Great Niigata Earthquake in 1964, it has become a matter of concern of public interest and a law on the earthquake insurance was established in 1966. After that, drawing up of the maximum amount of earthquake insurance contract, extension of items applicable to the earthquake insurance, and drawing up of the maximum total payment for one earthquake disaster has been realized with the progress of social economy. With the Great Hanshin-Awaji Earthquake as a turning point, the law was revised again. Namely, dwelling houses and household effects have become the objects for insurance, which are belonged to the fire insurance of dwelling house (a main contract), and the earthquake insurance is set up in a range from 30% to 50% of the main contract. The maximum total payment for one earthquake disaster has been drawn to 3.1 trillion yen, in which the burden ratio between nonlife insurance companies and the government is decided according to the total amount. Additionally, this paper introduces the response of nonlife insurance trade to the Great Hanshin-Awaji Earthquake, and the damages evaluation by various nonlife insurance companies in the paralysis of traffic network. 5 refs., 1 fig., 2 tabs.

  16. Earthquakes in the kindergarten educate for risk mitigation

    Science.gov (United States)

    Mata, Isabel; Rodrigues, Isabel; Matias, Luis

    2016-04-01

    "Earthquakes in the kindergarten educate for risk mitigation" Isabel Rodrigues, Jardim de Infância D. Dinis, Odivelas, Isabel Mata, Secondary School Adelaide Cabette, Odivelas Luis Matias (UL / IDL), Instituto Dom Luiz, Universityof Lisbon, Lisbon, Portugal In Portugal Education for risk is now recognized as a child training component and young learners should develop the right skills in the first years of life. School can have an important role in this process, as a privileged actor in the mobilization of every society, providing and promoting dynamic and educational practices aimed at the wider spectrum of education for citizenship, the adoption of safety behaviours, prevention and adequate management of risk. The Group of Schools Adelaide Cabette in Odivelas is now a set of schools, from Kindergarten to Secondary. Aiming at educating for risk prevention, we developed an experiment with a pre-school class directed to the seismic risk, which was extended to Earth Sciences because it is difficult to teach this topic to the youngest learners, either from Kindergarten or from Primary School, as they haven't learned enough about planet Earth (many don't even know that it is not flat but round like a ball). This experiment involved a working project 1, which was initially developed in one of the classrooms, in kindergarten D. Dinis, and many questions have been asked by the students. The explanation for the students' questions gave origin to a set of experiences developed in the Secondary school. The same class concluded the project in their own classroom. In this project the young learners could have contact with pre-school teachers, secondary and university researchers, thus promoting the sharing of different knowledge, including the scientific linked to the educational one. We would like to share our poster summarizing our experience which we feltwas not only a great challenge, but also a rewarding way to disseminate science to the youngest learners. 1. Keywords

  17. Reflections from the interface between seismological research and earthquake risk reduction

    Science.gov (United States)

    Sargeant, S.

    2012-04-01

    Scientific understanding of earthquakes and their attendant hazards is vital for the development of effective earthquake risk reduction strategies. Within the global disaster reduction policy framework (the Hyogo Framework for Action, overseen by the UN International Strategy for Disaster Reduction), the anticipated role of science and scientists is clear, with respect to risk assessment, loss estimation, space-based observation, early warning and forecasting. The importance of information sharing and cooperation, cross-disciplinary networks and developing technical and institutional capacity for effective disaster management is also highlighted. In practice, the degree to which seismological information is successfully delivered to and applied by individuals, groups or organisations working to manage or reduce the risk from earthquakes is variable. The challenge for scientists is to provide fit-for-purpose information that can be integrated simply into decision-making and risk reduction activities at all levels of governance and at different geographic scales, often by a non-technical audience (i.e. people without any seismological/earthquake engineering training). The interface between seismological research and earthquake risk reduction (defined here in terms of both the relationship between the science and its application, and the scientist and other risk stakeholders) is complex. This complexity is a function of a range issues that arise relating to communication, multidisciplinary working, politics, organisational practices, inter-organisational collaboration, working practices, sectoral cultures, individual and organisational values, worldviews and expectations. These factors can present significant obstacles to scientific information being incorporated into the decision-making process. The purpose of this paper is to present some personal reflections on the nature of the interface between the worlds of seismological research and risk reduction, and the

  18. Induced and Natural Seismicity: Earthquake Hazards and Risks in Ohio:

    Science.gov (United States)

    Besana-Ostman, G. M.; Worstall, R.; Tomastik, T.; Simmers, R.

    2013-12-01

    To adapt with increasing need to regulate all operations related to both the Utica and Marcellus shale play within the state, ODNR had recently strengthen its regulatory capability through implementation of stricter permit requirements, additional human resources and improved infrastructure. These ODNR's efforts on seismic risk reduction related to induced seismicity led to stricter regulations and many infrastructure changes related particularly to Class II wells. Permit requirement changes and more seismic monitoring stations were implemented together with additional injection data reporting from selected Class II well operators. Considering the possible risks related to seismic events in a region with relatively low seismicity, correlation between limited seismic data and injection volume information were undertaken. Interestingly, initial results showed some indications of both plugging and fracturing episodes. The real-time data transmission from seismic stations and availability of injection volume data enabled ODNR to interact with operators and manage wells dynamically. Furthermore, initial geomorphic and structural analyses indicated possible active faults in the northern and western portion of the state oriented NE-SW. The newly-mapped structures imply possible relatively bigger earthquakes in the region and consequently higher seismic risks. With the above-mentioned recent changes, ODNR have made critical improvement of its principal regulatory role in the state for oil and gas operations but also an important contribution to the state's seismic risk reduction endeavors. Close collaboration with other government agencies and the public, and working together with the well operators enhanced ODNR's capability to build a safety culture and achieve further public and industry participation towards a safer environment. Keywords: Induced seismicity, injection wells, seismic risks

  19. Future scenarios for earthquake and flood risk in Eastern Europe and Central Asia

    NARCIS (Netherlands)

    Murnane, Rick; Daniell, James E.; Schafer, A.M.; Ward, P.J.; Winsemius, H.C.; Simpson, A.; Tijssen, A.; Toro, Joaquin

    2017-01-01

    We report on a regional flood and earthquake risk assessment for 33 countries in Eastern Europe and Central Asia. Flood and earthquake risk were defined in terms of affected population and affected gross domestic product (GDP). Earthquake risk was also quantified in terms of fatalities and capital

  20. Uniform risk spectra of strong earthquake ground motion: NEQRISK

    International Nuclear Information System (INIS)

    Lee, V.W.; Trifunac, M.D.

    1987-01-01

    The concept of uniform risk spectra of Anderson and Trifunac (1977) has been generalized to include (1) more refined description of earthquake source zones, (2) the uncertainties in estimating seismicity parameters a and b in log 10 N = a - bM, (3) to consider uncertainties in estimation of maximum earthquake size in each source zone, and to (4) include the most recent results on empirical scaling of strong motion amplitudes at a site. Examples of using to new NEQRISK program are presented and compared with the corresponding case studies of Anderson and Trifunac (1977). The organization of the computer program NEQRISK is also briefly described

  1. Earthquake Risk Reduction to Istanbul Natural Gas Distribution Network

    Science.gov (United States)

    Zulfikar, Can; Kariptas, Cagatay; Biyikoglu, Hikmet; Ozarpa, Cevat

    2017-04-01

    Earthquake Risk Reduction to Istanbul Natural Gas Distribution Network Istanbul Natural Gas Distribution Corporation (IGDAS) is one of the end users of the Istanbul Earthquake Early Warning (EEW) signal. IGDAS, the primary natural gas provider in Istanbul, operates an extensive system 9,867km of gas lines with 750 district regulators and 474,000 service boxes. The natural gas comes to Istanbul city borders with 70bar in 30inch diameter steel pipeline. The gas pressure is reduced to 20bar in RMS stations and distributed to district regulators inside the city. 110 of 750 district regulators are instrumented with strong motion accelerometers in order to cut gas flow during an earthquake event in the case of ground motion parameters exceeds the certain threshold levels. Also, state of-the-art protection systems automatically cut natural gas flow when breaks in the gas pipelines are detected. IGDAS uses a sophisticated SCADA (supervisory control and data acquisition) system to monitor the state-of-health of its pipeline network. This system provides real-time information about quantities related to pipeline monitoring, including input-output pressure, drawing information, positions of station and RTU (remote terminal unit) gates, slum shut mechanism status at 750 district regulator sites. IGDAS Real-time Earthquake Risk Reduction algorithm follows 4 stages as below: 1) Real-time ground motion data transmitted from 110 IGDAS and 110 KOERI (Kandilli Observatory and Earthquake Research Institute) acceleration stations to the IGDAS Scada Center and KOERI data center. 2) During an earthquake event EEW information is sent from IGDAS Scada Center to the IGDAS stations. 3) Automatic Shut-Off is applied at IGDAS district regulators, and calculated parameters are sent from stations to the IGDAS Scada Center and KOERI. 4) Integrated building and gas pipeline damage maps are prepared immediately after the earthquake event. The today's technology allows to rapidly estimate the

  2. Risk management and safety

    International Nuclear Information System (INIS)

    Niehaus, F.; Novegno, A.

    1985-01-01

    Risk assessment, including probabilistic analyses, has made great progress over the past decade. In spite of the inherent uncertainties it has now become possible to utilize methods and results for decision making at various levels. This paper will, therefore, review risk management in industrial installations, risk management for energy safety policy and prospects of risk management in highly industrialized areas. (orig.) [de

  3. Probabilistic risk assessment of earthquakes at the Rocky Flats Plant and subsequent upgrade to reduce risk

    International Nuclear Information System (INIS)

    Day, S.A.

    1989-01-01

    An analysis to determine the risk associated with earthquakes at the Rocky Flats Plant was performed. Seismic analyses and structural evaluations were used to postulate building and equipment damage and radiological releases to the environment from various magnitudes of earthquakes. Dispersion modeling and dose assessment to the public were then calculated. The frequency of occurrence of various magnitudes of earthquakes were determined from the Department of Energy natural Phenomena Hazards Modeling Project. Risk to the public was probabilistically assessed for each magnitude of earthquake and for overall seismic risk. Based on the results of this Probabilistic Risk Assessment and a cost/benefit analysis, seismic upgrades are being implemented for several plutonium-handling facilities for the purpose of risk reduction

  4. Perceptions of risk characteristics of earthquakes compared to other hazards and their impact on risk tolerance.

    Science.gov (United States)

    Henrich, Liv; McClure, John; Doyle, Emma E H

    2018-03-05

    People tolerate different levels of risk owing to a variety of hazards. Previous research shows that the psychometric properties of hazards predict people's tolerance of them. However, this work has not taken into account events such as earthquakes. The present study tested how earthquakes score vis-à-vis risk properties and risk tolerance as compared to five other familiar hazards. Participants from Wellington, New Zealand (N=139) rated these six hazards using measures of risk characteristics and risk tolerance. Participants demonstrated different levels of risk tolerance for the different hazards and viewed earthquakes as having similar risk features to nuclear power. They also preferred different risk mitigation strategies for earthquakes (more government funding) to the other five hazards (stronger legislation). In addition, earthquake risk tolerance was predicted by different risk characteristics than the other five hazards. These findings will help risk communicators in identifying which risk characteristics to target to influence citizens' risk tolerance. © 2018 The Author(s). Disasters © Overseas Development Institute, 2018.

  5. It's Our Fault: better defining earthquake risk in Wellington, New Zealand

    Science.gov (United States)

    Van Dissen, R.; Brackley, H. L.; Francois-Holden, C.

    2012-12-01

    The Wellington region, home of New Zealand's capital city, is cut by a number of major right-lateral strike slip faults, and is underlain by the currently locked west-dipping subduction interface between the down going Pacific Plate, and the over-riding Australian Plate. In its short historic period (ca. 160 years), the region has been impacted by large earthquakes on the strike-slip faults, but has yet to bear the brunt of a subduction interface rupture directly beneath the capital city. It's Our Fault is a comprehensive study of Wellington's earthquake risk. Its objective is to position the capital city of New Zealand to become more resilient through an encompassing study of the likelihood of large earthquakes, and the effects and impacts of these earthquakes on humans and the built environment. It's Our Fault is jointly funded by New Zealand's Earthquake Commission, Accident Compensation Corporation, Wellington City Council, Wellington Region Emergency Management Group, Greater Wellington Regional Council, and Natural Hazards Research Platform. The programme has been running for six years, and key results to date include better definition and constraints on: 1) location, size, timing, and likelihood of large earthquakes on the active faults closest to Wellington; 2) earthquake size and ground shaking characterization of a representative suite of subduction interface rupture scenarios under Wellington; 3) stress interactions between these faults; 4) geological, geotechnical, and geophysical parameterisation of the near-surface sediments and basin geometry in Wellington City and the Hutt Valley; and 5) characterisation of earthquake ground shaking behaviour in these two urban areas in terms of subsoil classes specified in the NZ Structural Design Standard. The above investigations are already supporting measures aimed at risk reduction, and collectively they will facilitate identification of additional actions that will have the greatest benefit towards further

  6. Meeting the Challenge of Earthquake Risk Globalisation: Towards the Global Earthquake Model GEM (Sergey Soloviev Medal Lecture)

    Science.gov (United States)

    Zschau, J.

    2009-04-01

    Earthquake risk, like natural risks in general, has become a highly dynamic and globally interdependent phenomenon. Due to the "urban explosion" in the Third World, an increasingly complex cross linking of critical infrastructure and lifelines in the industrial nations and a growing globalisation of the world's economies, we are presently facing a dramatic increase of our society's vulnerability to earthquakes in practically all seismic regions on our globe. Such fast and global changes cannot be captured with conventional earthquake risk models anymore. The sciences in this field are, therefore, asked to come up with new solutions that are no longer exclusively aiming at the best possible quantification of the present risks but also keep an eye on their changes with time and allow to project these into the future. This does not apply to the vulnerablity component of earthquake risk alone, but also to its hazard component which has been realized to be time-dependent, too. The challenges of earthquake risk dynamics and -globalisation have recently been accepted by the Global Science Forum of the Organisation for Economic Co-operation and Development (OECD - GSF) who initiated the "Global Earthquake Model (GEM)", a public-private partnership for establishing an independent standard to calculate, monitor and communicate earthquake risk globally, raise awareness and promote mitigation.

  7. Psychological Vulnerability and Earthquake Risk Perception in Bucharest/Romania

    Science.gov (United States)

    Romeo Cretu, Zeno; Armas, Iuliana; Stanciugelu, Irina

    2010-05-01

    The importance of studying the relationship with the natural hazard events from a psycho-social perspective is fundamental by the experience with past disasters as much as by the research in the field that proved that the people's psychologic structures may constitute a starting point for risk reduction. People's psycho-behavioural patterns contain conscious or unconscious references to the environmental risk, thus creating certain adjustment strategies and mechanisms, with a certain degree of psychological vulnerability. In modern man's case, the high level of awareness in front of natural dangers, doubled by the perception of the environment's unsafety, experienced as a lack of control, brings to attention nowadays the problematic of the analysis of natural risk perception, as a main factor in the adjustment of human communities' capacity of adapting to the natural environment's dynamics. The major objective of this present work is, based on the development of an efficient evaluation methodology, to identify specific relational patterns to seismic risk in Bucharest, function the characteristics of the urban environment, the social, economical and psychological vulnerability, with results that can be applied for disaster management. For explaining human reactions and the way in which they perceive and evaluate the psychological resources, on a daily basis, but also in risk situations (earthquakes), a multi-modal questionnaire was conceived through qualitative methods (a focus group, along with experts from the Public and Administrative Sciences National School, Risk Communication Center). The questionnaire was structured on a 49 items sequence, in which were included different type of questions (with single or multiple answers, open questions etc), and also questions using different scaling methods. The items caught cognitive elements (expectations, anticipations and negative or positive judgments regarding risk element), affective (feelings) and behavioral

  8. Investigation of obstacles against effective crisis management in earthquake

    Directory of Open Access Journals (Sweden)

    Mahmood Nekoei-Moghadam

    2016-03-01

    Full Text Available Floods, hurricanes, landslides, hurricanes, tornadoes, earthquakes are events that a large group of people on earth are affected. In December 2003, the residents of Bam, Iran experienced an earthquake that measured 6.6 on the Richter scale and destroyed more than 90% of the city. The purpose of this study was to investigate obstacles against effective crisis management with considering service received by individuals in the Bam earthquake. In this study, domestic journals, foreign dissertations in Persian bases such as Google scholar, Magiran, IranMedex, SID and in English bases such as PubMed, Web of Science, Google scholar were used. The results of this study showed that there were many problems in various aspects of planning including: lack of coherent programs, lack of attention to the needs of health care, poor coordination between agencies and organizations and lack of appropriate training of volunteers and people.

  9. Strategic Risk Management

    OpenAIRE

    Sax, Johanna

    2015-01-01

    The aim of this thesis is to contribute to the literature with an investigation into strategic risk management practices from a strategic management and management accounting perspective. Previous research in strategic risk management has not provided sufficient evidence on the mechanisms behind firm practices, processes and tools for managing strategic risks, and their contingencies for value creation. In particular, the purpose of the thesis has been to fill the gaps in the l...

  10. Commodity risk management

    Directory of Open Access Journals (Sweden)

    Hilary Till

    2016-09-01

    Full Text Available This article discusses the practical issues involved in applying a disciplined risk management methodology to commodity futures trading. Accordingly, the paper shows how to apply methodologies derived from both conventional asset management and hedge fund management to futures trading. The article also discusses some of the risk management issues that are unique to leveraged futures trading.

  11. Commodity risk management

    OpenAIRE

    Hilary Till

    2016-01-01

    This article discusses the practical issues involved in applying a disciplined risk management methodology to commodity futures trading. Accordingly, the paper shows how to apply methodologies derived from both conventional asset management and hedge fund management to futures trading. The article also discusses some of the risk management issues that are unique to leveraged futures trading.

  12. Earthquake risk modeling for Baden-Wurttemberg, Germany

    Science.gov (United States)

    Tyagunov, S.; Wenzel, F.; Sokolov, V.; Stempniewski, L.

    2009-04-01

    The paper is to present an improved CEDIM Earthquake Risk Model aimed at assessing probable seismic damage and losses on a regional scale. The main concept of the GIS-based approach was described in several previous publications of the CEDIM earthquake team and the developed computational algorithm based on simplified models was used for the seismic risk mapping for Germany. Here several principal improvements of the method are presented, which concern all the main factors contributing to the risk (hazard, vulnerability, assets) and allow obtaining more detailed and accurate estimates of damage and losses in earthquake prone areas. The description and application of the modified approach is done with specific reference to the area of the Federal State of Germany - Baden-Wurttemberg. The main modifications of the approach are as follows: - Utilization of the CORINE land use data (CORINE Land Cover 2000 - Germany), so the real spatial distribution of the building stock within the area of communities can be taken into consideration. Consequently, the intersection of the asset and hazard layers can be done in a more accurate manner. The intersection of the grid of the CLC classes with the grid of the administrative boundaries of communities increases the number of the computational cells and allows more differentiated consideration of the affected area. This is especially appropriate for analysis of scenario earthquakes. - Improvement of the vulnerability composition models is done on the base of available information from the INFAS statistical dataset. Instead of the previously used representative vulnerability models based on the classification of communities into population classes depending on their size, the improved approach implies construction of individual vulnerability composition models for all communities. - Improvement of the method from the viewpoint of the seismic input for scenario earthquakes is based on a realistic engineering-seismological model

  13. Development of fire risk assessment method caused by earthquake

    International Nuclear Information System (INIS)

    Mitomo, Nobuo; Matsukura, Hiroshi; Matsuoka, Takeshi; Suzuki, Kazutaka

    2000-01-01

    The purpose of this research is to establish the assessment method of the risk of the multiple fires caused by earthquake, in the framework of PSA. In order to establish this method, we have settled four tasks and started a five years research project in 1999 for five years. These results will be useful for not only nuclear power plants but also chemical plants, traffic systems etc. (author)

  14. Insight into the Earthquake Risk Information Seeking Behavior of the Victims: Evidence from Songyuan, China.

    Science.gov (United States)

    Li, Shasha; Zhai, Guofang; Zhou, Shutian; Fan, Chenjing; Wu, Yunqing; Ren, Chongqiang

    2017-03-07

    Efficient risk communication is a vital way to reduce the vulnerability of individuals when facing emergency risks, especially regarding earthquakes. Efficient risk communication aims at improving the supply of risk information and fulfilling the need for risk information by individuals. Therefore, an investigation into individual-level information seeking behavior within earthquake risk contexts is very important for improved earthquake risk communication. However, at present there are very few studies that have explored the behavior of individuals seeking earthquake risk information. Under the guidance of the Risk Information Seeking and Processing model as well as relevant practical findings using the structural equation model, this study attempts to explore the main determinants of an individual's earthquake risk information seeking behavior, and to validate the mediator effect of information need during the seeking process. A questionnaire-based survey of 918 valid respondents in Songyuan, China, who had been hit by a small earthquake swarm, was used to provide practical evidence for this study. Results indicated that information need played a noteworthy role in the earthquake risk information seeking process, and was detected both as an immediate predictor and as a mediator. Informational subjective norms drive the seeking behavior on earthquake risk information through both direct and indirect approaches. Perceived information gathering capacity, negative affective responses and risk perception have an indirect effect on earthquake risk information seeking behavior via information need. The implications for theory and practice regarding risk communication are discussed and concluded.

  15. Insight into the Earthquake Risk Information Seeking Behavior of the Victims: Evidence from Songyuan, China

    Science.gov (United States)

    Li, Shasha; Zhai, Guofang; Zhou, Shutian; Fan, Chenjing; Wu, Yunqing; Ren, Chongqiang

    2017-01-01

    Efficient risk communication is a vital way to reduce the vulnerability of individuals when facing emergency risks, especially regarding earthquakes. Efficient risk communication aims at improving the supply of risk information and fulfilling the need for risk information by individuals. Therefore, an investigation into individual-level information seeking behavior within earthquake risk contexts is very important for improved earthquake risk communication. However, at present there are very few studies that have explored the behavior of individuals seeking earthquake risk information. Under the guidance of the Risk Information Seeking and Processing model as well as relevant practical findings using the structural equation model, this study attempts to explore the main determinants of an individual’s earthquake risk information seeking behavior, and to validate the mediator effect of information need during the seeking process. A questionnaire-based survey of 918 valid respondents in Songyuan, China, who had been hit by a small earthquake swarm, was used to provide practical evidence for this study. Results indicated that information need played a noteworthy role in the earthquake risk information seeking process, and was detected both as an immediate predictor and as a mediator. Informational subjective norms drive the seeking behavior on earthquake risk information through both direct and indirect approaches. Perceived information gathering capacity, negative affective responses and risk perception have an indirect effect on earthquake risk information seeking behavior via information need. The implications for theory and practice regarding risk communication are discussed and concluded. PMID:28272359

  16. Insight into the Earthquake Risk Information Seeking Behavior of the Victims: Evidence from Songyuan, China

    Directory of Open Access Journals (Sweden)

    Shasha Li

    2017-03-01

    Full Text Available Efficient risk communication is a vital way to reduce the vulnerability of individuals when facing emergency risks, especially regarding earthquakes. Efficient risk communication aims at improving the supply of risk information and fulfilling the need for risk information by individuals. Therefore, an investigation into individual-level information seeking behavior within earthquake risk contexts is very important for improved earthquake risk communication. However, at present there are very few studies that have explored the behavior of individuals seeking earthquake risk information. Under the guidance of the Risk Information Seeking and Processing model as well as relevant practical findings using the structural equation model, this study attempts to explore the main determinants of an individual’s earthquake risk information seeking behavior, and to validate the mediator effect of information need during the seeking process. A questionnaire-based survey of 918 valid respondents in Songyuan, China, who had been hit by a small earthquake swarm, was used to provide practical evidence for this study. Results indicated that information need played a noteworthy role in the earthquake risk information seeking process, and was detected both as an immediate predictor and as a mediator. Informational subjective norms drive the seeking behavior on earthquake risk information through both direct and indirect approaches. Perceived information gathering capacity, negative affective responses and risk perception have an indirect effect on earthquake risk information seeking behavior via information need. The implications for theory and practice regarding risk communication are discussed and concluded.

  17. Certification and risk management

    International Nuclear Information System (INIS)

    Villanueva Fernandez, M.

    2015-01-01

    Nowadays more organizations are increasingly aware of the importance of properly managing the uncertainty of its activities and build competitive advantages through the identification, assessment and management of risks that they face. Risk management is also an aspect of great importance within the new version of ISO fact it is one of the most innovative and also the most laborious, because an appropriate risk management achieves expected results and customer satisfaction. In conclusion, risk management is a new field of business and can be considered a cross-cutting component for other relevant factors of organizational change management. (Author)

  18. [Global risk management].

    Science.gov (United States)

    Sghaier, W; Hergon, E; Desroches, A

    2015-08-01

    Risk management is a fundamental component of any successful company, whether it is in economic, societal or environmental aspect. Risk management is an especially important activity for companies that optimal security challenge of products and services is great. This is the case especially for the health sector institutions. Risk management is therefore a decision support tool and a means to ensure the sustainability of an organization. In this context, what methods and approaches implemented to manage the risks? Through this state of the art, we are interested in the concept of risk and risk management processes. Then we focus on the different methods of risk management and the criteria for choosing among these methods. Finally we highlight the need to supplement these methods by a systemic and global approach including through risk assessment by the audits. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  19. Geoethics and decision science issues in Japan's disaster management system: case study in the 2011 Tohoku earthquake and tsunami

    Science.gov (United States)

    Sugimoto, Megumi

    2015-04-01

    The March 11, 2011 Tohoku earthquake and its tsunami killed 18,508 people, including the missing (National Police Agency report as of April 2014) and raise the Level 7 accident at TEPCO's Fukushima Dai-ichi nuclear power station in Japan. The problems revealed can be viewed as due to a combination of risk-management, risk-communication, and geoethics issues. Japan's preparations for earthquakes and tsunamis are based on the magnitude of the anticipated earthquake for each region. The government organization coordinating the estimation of anticipated earthquakes is the "Headquarters for Earthquake Research Promotion" (HERP), which is under the Ministry of Education, Culture, Sports, Science and Technology (MEXT). Japan's disaster mitigation system is depicted schematically as consisting of three layers: seismology, civil engineering, and disaster mitigation planning. This research explains students in geoscience should study geoethics as part of their education related Tohoku earthquake and the Level 7 accident at TEPCO's Fukushima Dai-ichi nuclear power station. Only when they become practicing professionals, they will be faced with real geoethical dilemmas. A crisis such as the 2011 earthquake, tsunami, and Fukushima Dai-ichi nuclear accident, will force many geoscientists to suddenly confront previously unanticipated geoethics and risk-communication issues. One hopes that previous training will help them to make appropriate decisions under stress. We name it "decision science".

  20. Agile risk management

    CERN Document Server

    Moran, Alan

    2014-01-01

    This work is the definitive guide for IT managers and agile practitioners. It elucidates the principles of agile risk management and how these relate to individual projects. Explained in clear and concise terms, this synthesis of project risk management and agile techniques is illustrated using the major methodologies such as XP, Scrum and DSDM.Although the agile community frequently cites risk management, research suggests that risk is often narrowly defined and, at best, implicitly treated, which in turn leads to an inability to make informed decisions concerning risk and reward and a poor u

  1. Simulation and monitoring tools to protect disaster management facilities against earthquakes

    Science.gov (United States)

    Saito, Taiki

    2017-10-01

    The earthquakes that hit Kumamoto Prefecture in Japan on April 14 and 16, 2016 severely damaged over 180,000 houses, including over 8,000 that were completely destroyed and others that were partially damaged according to the Cabinet Office's report as of November 14, 2016 [1]. Following these earthquakes, other parts of the world have been struck by earthquakes including Italy and New Zealand as well as the central part of Tottori Prefecture in October, where the earthquake-induced collapse of buildings has led to severe damage and casualties. The earthquakes in Kumamoto Prefecture, in fact, damaged various disaster management facilities including Uto City Hall, which significantly hindered the city's evacuation and recovery operations. One of the most crucial issues in times of disaster is securing the functions of disaster management facilities such as city halls, hospitals and fire stations. To address this issue, seismic simulations are conducted on the East and the West buildings of Toyohashi City Hall using the analysis tool developed by the author, STERA_3D, with the data of the ground motion waveform prediction for the Nankai Trough earthquake provided by the Ministry of Land, Infrastructure, Transport and Tourism. As the result, it was found that the buildings have sufficient earthquake resistance. It turned out, however, that the west building is at risk for wall cracks or ceiling panel's collapse while in the east building, people would not be able to stand through the strong quakes of 7 on the seismic intensity scale and cabinets not secured to the floors or walls would fall over. Additionally, three IT strong-motion seismometers were installed in the city hall to continuously monitor vibrations. Every five minutes, the vibration data obtained by the seismometers are sent to the computers in Toyohashi University of Technology via the Internet for the analysis tools to run simulations in the cloud. If an earthquake strikes, it is able to use the results

  2. [Trust in organizations concerned with risks of the Great East Japan Earthquake].

    Science.gov (United States)

    Nakayachi, Kazuya; Kudo, Daisuke; Ozaki, Taku

    2014-06-01

    This study investigated the levels of public trust in organizations associated with the Great East Japan Earthquake. In Study 1 (N = 639), the levels of trust in eight organizations as well as the determinants of trust--perceived salient value similarity (SVS), ability, and motivation--were measured twice, first immediately after the earthquake and then a year later. The results indicated that the trust levels for six of the eight organizations had been preserved, supporting the double asymmetric effect of trust. The results of structural equation modeling (SEM) revealed that SVS explained trust more when the organization had been less trusted. Trust in the organization explains well the perceived reduction of the target risk. The results of SEM in Study 2 (N = 1,030) replicated those of Study 1, suggesting the stability of the explanatory power of the determinants of trust. Implications of the study for risk management practices are discussed.

  3. Human Trafficking in Nepal: Post-Earthquake Risk and Response.

    Science.gov (United States)

    Gyawali, Bishal; Keeling, June; Kallestrup, Per

    2017-04-01

    As Nepal mourns the 1-year commemoration of the April 2015 earthquake and its aftershocks that killed more than 8500 people and left thousands injured and displaced, other more hidden repercussions of the resultant chaotic environment need attention: the increased risk of human trafficking. Considering that natural disasters provide a milieu for this illicit trade, there is a need for a robust response from stakeholders such as donors, civil society organizations, and government organizations against human trafficking following disasters such as the Nepal earthquake. Responsibility to prevent and fight trafficking should be explicitly included in the mandate of relief and rehabilitation mechanisms set up at the national level to coordinate the disaster relief response, serving to support populations in both rural and urban areas. (Disaster Med Public Health Preparedness. 2017;11:153-154).

  4. Risk Management Implementation Tool

    Science.gov (United States)

    Wright, Shayla L.

    2004-01-01

    Continuous Risk Management (CM) is a software engineering practice with processes, methods, and tools for managing risk in a project. It provides a controlled environment for practical decision making, in order to assess continually what could go wrong, determine which risk are important to deal with, implement strategies to deal with those risk and assure the measure effectiveness of the implemented strategies. Continuous Risk Management provides many training workshops and courses to teach the staff how to implement risk management to their various experiments and projects. The steps of the CRM process are identification, analysis, planning, tracking, and control. These steps and the various methods and tools that go along with them, identification, and dealing with risk is clear-cut. The office that I worked in was the Risk Management Office (RMO). The RMO at NASA works hard to uphold NASA s mission of exploration and advancement of scientific knowledge and technology by defining and reducing program risk. The RMO is one of the divisions that fall under the Safety and Assurance Directorate (SAAD). I worked under Cynthia Calhoun, Flight Software Systems Engineer. My task was to develop a help screen for the Continuous Risk Management Implementation Tool (RMIT). The Risk Management Implementation Tool will be used by many NASA managers to identify, analyze, track, control, and communicate risks in their programs and projects. The RMIT will provide a means for NASA to continuously assess risks. The goals and purposes for this tool is to provide a simple means to manage risks, be used by program and project managers throughout NASA for managing risk, and to take an aggressive approach to advertise and advocate the use of RMIT at each NASA center.

  5. Financial Risk Management

    OpenAIRE

    Catalin-Florinel Stanescu; Laurentiu Mircea Simion

    2011-01-01

    Concerns about the financial risk is increasing. In this climate, companies of all types and sizes want a robust framework for financial risk management to meet compliance requirements, contribute to better decision making and increase performance. Financial risk management professionals working with financial institutions and other corporate clients to achieve these objectives.

  6. Decision making biases in the communication of earthquake risk

    Science.gov (United States)

    Welsh, M. B.; Steacy, S.; Begg, S. H.; Navarro, D. J.

    2015-12-01

    L'Aquila, with 6 scientists convicted of manslaughter, shocked the scientific community, leading to urgent re-appraisal of communication methods for low-probability, high-impact events. Before the trial, a commission investigating the earthquake recommended risk assessment be formalised via operational earthquake forecasts and that social scientists be enlisted to assist in developing communication strategies. Psychological research has identified numerous decision biases relevant to this, including hindsight bias, where people (after the fact) overestimate an event's predictability. This affects experts as well as naïve participants as it relates to their ability to construct a plausible causal story rather than the likelihood of the event. Another problem is availability, which causes overestimation of the likelihood of observed rare events due to their greater noteworthiness. This, however, is complicated by the 'description-experience' gap, whereby people underestimate probabilities for events they have not experienced. That is, people who have experienced strong earthquakes judge them more likely while those who have not judge them less likely - relative to actual probabilities. Finally, format changes alter people's decisions. That is people treat '1 in 10,000' as different from 0.01% despite their mathematical equivalence. Such effects fall under the broad term framing, which describes how different framings of the same event alter decisions. In particular, people's attitude to risk depends significantly on how scenarios are described. We examine the effect of biases on the communication of change in risk. South Australian participants gave responses to scenarios describing familiar (bushfire) or unfamiliar (earthquake) risks. While bushfires are rare in specific locations, significant fire events occur each year and are extensively covered. By comparison, our study location (Adelaide) last had a M5 quake in 1954. Preliminary results suggest the description

  7. Value of risk management

    OpenAIRE

    Vik, Marie Amdal

    2012-01-01

    Master's thesis in Risk management The overall aim of this study was to discuss the validity of the hypothesis that risk management contributes with added value to projects and the enterprise holding the projects, and consequently to the enterprise’s stakeholders. To examine this hypothesis, a case study of three projects taken from the same portfolio at Statoil was selected. The projects were said to have an active risk management. Data was collected from the project’s documentation as...

  8. Exchange Risk Management Policy

    CERN Document Server

    2005-01-01

    At the Finance Committee of March 2005, following a comment by the CERN Audit Committee, the Chairman invited the Management to prepare a document on exchange risk management policy. The Finance Committee is invited to take note of this document.

  9. Identifying and Managing Risk.

    Science.gov (United States)

    Abraham, Janice M.

    1999-01-01

    The role of the college or university chief financial officer in institutional risk management is (1) to identify risk (physical, casualty, fiscal, business, reputational, workplace safety, legal liability, employment practices, general liability), (2) to develop a campus plan to reduce and control risk, (3) to transfer risk, and (4) to track and…

  10. Managing Operational Risk

    OpenAIRE

    Stanciu Victoria; Ali Eden; Ivancenco Veronica Constanta

    2010-01-01

    Managing risks become a very challenging task for any organization and one of its priorities. The rising complexity of modern business processes, the globalization and the IT business perspective determined important changes in making business approach bringing opportunities but also increasing risks. Recent years have emphasized concern and focus on risk, and it became increasingly clear that a need exists for a robust framework to effectively identify, assess, and manage risk. COSO response...

  11. Risk management overview

    International Nuclear Information System (INIS)

    McGovern, S.

    1995-01-01

    Launching of the first natural gas contract by the New York Mercantile Exchange (NYMEX) in April 1990 was a huge success which allowed natural gas to surpass crude oil as the most successful launch of any commodity contract. Despite this unprecedented initial success it must be kept in mind that in a competitive marketplace there are risks of many kinds (market risks, price risks, basis risks, currency risks and timing risks), that parties must deal with in everyday operations. The concept of risk management was defined, techniques and issues in risk management were explained, a glossary of fully explained industry terms, and basic financial tools most often used in risk management, were provided. 11 figs

  12. Earthquakes

    Science.gov (United States)

    ... Centers Evacuation Center Play Areas Animals in Public Evacuation Centers Pet Shelters Interim Guidelines for Animal Health and Control of Disease Transmission in Pet Shelters Protect Your Pets Earthquakes Language: English (US) Español (Spanish) Recommend on Facebook ...

  13. A stochastic risk assessment for Eastern Europe and Central Asian countries for earthquakes

    Science.gov (United States)

    Daniell, James; Schaefer, Andreas; Toro, Joaquin; Murnane, Rick; Tijssen, Annegien; Simpson, Alanna; Saito, Keiko; Winsemius, Hessel; Ward, Philip

    2015-04-01

    This systematic assessment of earthquake risk for 33 countries in the ECA region was motivated by the interest of the World Bank and the Global Facility for Disaster Reduction and Recovery (GFDRR) in supporting Disaster Risk Management (DRM) efforts. They envisaged an exposure-based analysis that looked at the potential economic and/or social exposure of the populations of various countries to earthquake risk. Using a stochastic earthquake hazard model and historical catalogues, a unified earthquake catalogue was created for the 33 countries. A combined fault and background source model was created using data from many authors. The maximum magnitude and seismotectonic source zone discretization was undertaken using logic tree approaches. Site effects were taken into account on the basis of local topography and tectonic regime. Two approaches were used to calculate local ground motion - intensity prediction equations for MMI and a combination of GMPEs for stable and active settings. A 1km grid was used for analysis with aggregations of exposure quantified in terms of GDP and capital stock using disaggregated provincial analysis from CATDAT, as well as population data from Deltares. Vulnerability functions were calculated using socio-economic empirical functions derived by Daniell (2014) for the countries taking into account historical losses, seismic resistant code implementation and building typologies in each country. PML curves were created for each province in the 33 nations, through 3 methods; the 1st using direct historical values via the CATDAT Damaging Earthquakes Database; the 2nd using normalization procedures in order to provide a quick estimate of the historical record quantified in today's terms filling in gaps; and the 3rd being a traditional stochastic modelling approach over a period of 10,000 years taking all uncertainties into account. SSP projections of growth from the OECD were used to quantify the risk in 2010, 2030 and 2080 in order to examine

  14. Environmental asset management: Risk management systems

    CSIR Research Space (South Africa)

    Naudé, Brian

    2017-07-01

    Full Text Available purposes until the assets are exhausted. This paper addresses elements of environmental crime and the risk management strategies as part of EAP, including risk management system functions. A unique implemented risk management system in the Kruger National...

  15. Earthquake consequences and measures for reduction of seismic risk.

    Science.gov (United States)

    Jurukovski, D

    1997-09-01

    Earthquakes are one of the most destructive of all natural disasters. This article discusses the consequences of earthquakes on material property. In addition, measures for the control and reduction of the consequences of earthquakes are described. Emphasis is placed on appropriate preparation by the general population and the need for a rapid and efficient response of governmental agencies. Finally, the experience of the staff of the Institute of Earthquake Engineering and Engineering Seismology in minimizing the consequences of earthquakes is described.

  16. Risk Management and Simulation

    DEFF Research Database (Denmark)

    Skovmand, David

    2014-01-01

    Review of: Risk Management and Simulation / Aparna Gupta. Boca Raton, FL: CRC Press, 2013, xxix + 491 pp., $99.95(H), ISBN: 978-1-4398-3594-4.......Review of: Risk Management and Simulation / Aparna Gupta. Boca Raton, FL: CRC Press, 2013, xxix + 491 pp., $99.95(H), ISBN: 978-1-4398-3594-4....

  17. Perspectives: Intellectual Risk Management

    Science.gov (United States)

    Hall, James C.

    2013-01-01

    Ask a college administrator about students and risk management, and you're likely to get a quick and agitated speech about alcohol consumption and bad behavior or a meditation on mental health and campus safety. But in colleges and universities, we manage intellectual risk-taking too. Bring that up, and you'll probably get little out of that same…

  18. Managing Risk and Opportunity

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Garvey, Maxine; Roggi, Oliviero

    This book promotes good risk governance and risk management practices to corporate managers, executives, and directors wherever they operate around the world. The major corporate scandals have their roots in governance failure pointing to the link between risk governance and good performance...... outcomes. This topic is timely and of interest both to the academic community as well as to practicing managers, executives, and directors. The volume focuses on contemporary risk leadership issues based on recent research insights but avoids excessive technical language and mathematical formulas. The book...... the arguments in logical steps explicating relevant techniques and practices along the way that invite to immediate applications and practical thinking....

  19. Agricultural risk management

    DEFF Research Database (Denmark)

    Lund, Mogens; Oksen, Arne; Larsen, Torben U.

    2005-01-01

    A new model for risk management in agriculture is described in the paper. The risk model is constructed as a context dependent process, which includes four main phases. The model is aimed at agricultural advisors, who wish to facilitate and disseminate risk management to farmers. It is developed...... and tested by an action research approach in an attempt to make risk management more applicable on family farms. Our obtained experiences indicate that farmers don’t apply probabilistic thinking and other concepts according to formal decision theory....

  20. Managing Risk and Opportunity

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Garvey, Maxine; Roggi, Oliviero

    This book promotes good risk governance and risk management practices to corporate managers, executives, and directors wherever they operate around the world. The major corporate scandals have their roots in governance failure pointing to the link between risk governance and good performance...... outcomes. This topic is timely and of interest both to the academic community as well as to practicing managers, executives, and directors. The volume focuses on contemporary risk leadership issues based on recent research insights but avoids excessive technical language and mathematical formulas. The book....... The underlying logic is built on the principles of financial economics where benefits derive from reducing bankruptcy costs and increasing future cash inflows. This provides a stringent framework for analyzing the effect of different risk management actions and behaviors in effective risk-taking organizations...

  1. Individual Property Risk Management

    Directory of Open Access Journals (Sweden)

    Michael S. Finke

    2010-01-01

    Full Text Available This paper reviews household property risk management and estimates normatively optimal choice under theoretical assumptions. Although risk retention limits are common in the financial planning industry, estimates of optimal risk retention that include both financial and human wealth far exceed limits commonly recommended. Households appear to frame property losses differently from other wealth losses leading to wealth-reducing, excess risk transfer. Possible theoretical explanations for excess sensitivity to loss are reviewed. Differences between observed and optimal risk management imply a large potential gain from improved choice.

  2. Remote sensing and earthquake risk: A (re)insurance perspective

    Science.gov (United States)

    Smolka, Anselm; Siebert, Andreas

    2013-04-01

    The insurance sector is faced with two issues regarding earthquake risk: the estimation of rarely occurring losses from large events and the assessment of the average annual net loss. For this purpose, knowledge is needed of actual event losses, of the distribution of exposed values, and of their vulnerability to earthquakes. To what extent can remote sensing help the insurance industry fulfil these tasks, and what are its limitations? In consequence of more regular and high-resolution satellite coverage, we have seen earth observation and remote sensing methods develop over the past years to a stage where they appear to offer great potential for addressing some shortcomings of the data underlying risk assessment. These include lack of statistical representativeness and lack of topicality. Here, remote sensing can help in the following areas: • Inventories of exposed objects (pre- and post-disaster) • Projection of small-scale ground-based vulnerability classification surveys to a full inventory • Post-event loss assessment But especially from an insurance point of view, challenges remain. The strength of airborne remote sensing techniques lies in outlining heavily damaged areas where damage is caused by easily discernible structural failure, i.e. total or partial building collapse. Examples are the Haiti earthquake (with minimal insured loss) and the tsunami-stricken areas in the Tohoku district of Japan. What counts for insurers, however, is the sum of monetary losses. The Chile, the Christchurch and the Tohoku earthquakes each caused insured losses in the two-digit billion dollar range. By far the greatest proportion of these insured losses were due to non-structural damage to buildings, machinery and equipment. Even with the Tohoku event, no more than 30% of the total material damage was caused by the tsunami according to preliminary surveys, and this figure includes damage due to earthquake shock which was unrecognisable after the passage of the tsunami

  3. Impact of Short-term Changes In Earthquake Hazard on Risk In Christchurch, New Zealand

    Science.gov (United States)

    Nyst, M.

    2012-12-01

    The recent Mw 7.1, 4 September 2010 Darfield, and Mw 6.2, 22 February 2011 Christchurch, New Zealand earthquakes and the following aftershock activity completely changed the existing view on earthquake hazard of the Christchurch area. Not only have several faults been added to the New Zealand fault database, the main shocks were also followed by significant increases in seismicity due to high aftershock activity throughout the Christchurch region that is still on-going. Probabilistic seismic hazard assessment (PSHA) models take into account a stochastic event set, the full range of possible events that can cause damage or loss at a particular location. This allows insurance companies to look at their risk profiles via average annual losses (AAL) and loss-exceedance curves. The loss-exceedance curve is derived from the full suite of seismic events that could impact the insured exposure and plots the probability of exceeding a particular loss level over a certain period. Insurers manage their risk by focusing on a certain return period exceedance benchmark, typically between the 100 and 250 year return period loss level, and then reserve the amount of money needed to account for that return period loss level, their so called capacity. This component of risk management is not too sensitive to short-term changes in risk due to aftershock seismicity, as it is mostly dominated by longer-return period, larger magnitude, more damaging events. However, because the secondairy uncertainties are taken into account when calculating the exceedance probability, even the longer return period losses can still experience significant impact from the inclusion of time-dependent earthquake behavior. AAL is calculated by summing the product of the expected loss level and the annual rate for all events in the event set that cause damage or loss at a particular location. This relatively simple metric is an important factor in setting the annual premiums. By annualizing the expected losses

  4. Managing Risk and Opportunity

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Garvey, Maxine; Roggi, Oliviero

    This book promotes good risk governance and risk management practices to corporate managers, executives, and directors wherever they operate around the world. The major corporate scandals have their roots in governance failure pointing to the link between risk governance and good performance...... outcomes. This topic is timely and of interest both to the academic community as well as to practicing managers, executives, and directors. The volume focuses on contemporary risk leadership issues based on recent research insights but avoids excessive technical language and mathematical formulas. The book...... is framed around the challenges imposed on executives and directors in dealing with an increasingly complex and unpredictable world. This requires a new risk leadership focus that not only avoids the downside risks but also considers ways to exploit the upside potential offered by a dynamic environment...

  5. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  6. Probabilistic Risk Assessment: Piping Fragility due to Earthquake Fault Mechanisms

    Directory of Open Access Journals (Sweden)

    Bu Seog Ju

    2015-01-01

    Full Text Available A lifeline system, serving as an energy-supply system, is an essential component of urban infrastructure. In a hospital, for example, the piping system supplies elements essential for hospital operations, such as water and fire-suppression foam. Such nonstructural components, especially piping systems and their subcomponents, must remain operational and functional during earthquake-induced fires. But the behavior of piping systems as subjected to seismic ground motions is very complex, owing particularly to the nonlinearity affected by the existence of many connections such as T-joints and elbows. The present study carried out a probabilistic risk assessment on a hospital fire-protection piping system’s acceleration-sensitive 2-inch T-joint sprinkler components under seismic ground motions. Specifically, the system’s seismic capacity, using an experimental-test-based nonlinear finite element (FE model, was evaluated for the probability of failure under different earthquake-fault mechanisms including normal fault, reverse fault, strike-slip fault, and near-source ground motions. It was observed that the probabilistic failure of the T-joint of the fire-protection piping system varied significantly according to the fault mechanisms. The normal-fault mechanism led to a higher probability of system failure at locations 1 and 2. The strike-slip fault mechanism, contrastingly, affected the lowest fragility of the piping system at a higher PGA.

  7. Safety (management and technology). Reality of anti-earthquake measures in chemical plants; Anzen (manejimento to tekunoroji). Kagaku kojo no jishin taisaku no jissai

    Energy Technology Data Exchange (ETDEWEB)

    Wataya, I. [Asahi Chemical Industry Co. Ltd., Osaka (Japan)

    1994-08-05

    In Japan where there have been occurring many earthquakes, anti-earthquake measures is one of important things that corporations should take as risk management. In particular, in the chemical industry where a large amount of combustible materials, toxic materials and high-pressure gases are used which has high potential hazard, it is its social responsibility to prevent leakage, fires and explosions of those materials due to earthquakes, and to take in advance measures for minimizing damages if they happen. This paper introduces, as actual anti-earthquake measures, mainly the anti-earthquake measures for facilities and equipment and the plans of prevention of disasters by earthquake of the Kawasaki Plant of Asahi Kasei Co., Ltd. The points in anti-earthquake design are to determine design idea and anti-earthquake design standards based on the investigations into the locational conditions of plants, the evaluation of plant safety and estimation of damage at the time of earthquake; and to adopt a fail safe mechanism for operating a plant on the safe side in the event of earthquake in its design. 2 refs., 1 fig.

  8. Programmatic risk management system

    Energy Technology Data Exchange (ETDEWEB)

    Mahn, J. [Sandia National Labs., Albuquerque, NM (United States); Wood, C.L. [Automated Solutions of Albuquerque, NM (United States)

    1996-07-01

    The purpose of the Programmatic Risk Management System (PRMS) is to evaluate and manage potential risks associated with proposed projects (i.e., new products or processes, or possible research and technological development projects). Although the PRMS considers some technical aspects of risk, the primary focus of the methodology is programmatic risk. That is, the methodology permits an assessment of risks associated with such issues as the ability to successfully produce a product that performs in accordance with all customer requirements, and the availability and allocation of resources (money, equipment, facilities, skilled personnel). The PRMS process consists of five formalized activities that are essential for effective management of risks associated with proposed projects. These activities include risk assessment, development of appropriate risk mitigation strategies, estimating strategy implementation cost, ranking of risk mitigation strategies for resource allocation, and scheduling of strategy implementing. The PRMS utilizes a ranking system that allows the user to identify the most cost-effective investment of resources of minimizing risk.

  9. Groundwater Risk Management Handbook

    Science.gov (United States)

    2008-01-01

    have adopted tiered "Risk Management Options" (e.g., Florida’s "Global Risk- Based Corrective Action [ RBCA ]"), which recognize the technical...Interstate Technology and Regulatory Council (ITRC) also completed a survey of states for RBCA programs; this survey is available at http://www.itrcweb.org

  10. Food, water, and fault lines: Remote sensing opportunities for earthquake-response management of agricultural water

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Jenna, E-mail: jmmartin@ucdavis.edu; Ustin, Susan; Sandoval-Solis, Samuel; O' Geen, Anthony Toby

    2016-09-15

    Earthquakes often cause destructive and unpredictable changes that can affect local hydrology (e.g. groundwater elevation or reduction) and thus disrupt land uses and human activities. Prolific agricultural regions overlie seismically active areas, emphasizing the importance to improve our understanding and monitoring of hydrologic and agricultural systems following a seismic event. A thorough data collection is necessary for adequate post-earthquake crop management response; however, the large spatial extent of earthquake's impact makes challenging the collection of robust data sets for identifying locations and magnitude of these impacts. Observing hydrologic responses to earthquakes is not a novel concept, yet there is a lack of methods and tools for assessing earthquake's impacts upon the regional hydrology and agricultural systems. The objective of this paper is to describe how remote sensing imagery, methods and tools allow detecting crop responses and damage incurred after earthquakes because a change in the regional hydrology. Many remote sensing datasets are long archived with extensive coverage and with well-documented methods to assess plant-water relations. We thus connect remote sensing of plant water relations to its utility in agriculture using a post-earthquake agrohydrologic remote sensing (PEARS) framework; specifically in agro-hydrologic relationships associated with recent earthquake events that will lead to improved water management. - Highlights: • Remote sensing to improve agricultural disaster management • Introduce post-earthquake agrohydrologic remote sensing (PEARS) framework • Apply PEARS framework to 2010 Maule Earthquake in Central Chile.

  11. Food, water, and fault lines: Remote sensing opportunities for earthquake-response management of agricultural water

    International Nuclear Information System (INIS)

    Rodriguez, Jenna; Ustin, Susan; Sandoval-Solis, Samuel; O'Geen, Anthony Toby

    2016-01-01

    Earthquakes often cause destructive and unpredictable changes that can affect local hydrology (e.g. groundwater elevation or reduction) and thus disrupt land uses and human activities. Prolific agricultural regions overlie seismically active areas, emphasizing the importance to improve our understanding and monitoring of hydrologic and agricultural systems following a seismic event. A thorough data collection is necessary for adequate post-earthquake crop management response; however, the large spatial extent of earthquake's impact makes challenging the collection of robust data sets for identifying locations and magnitude of these impacts. Observing hydrologic responses to earthquakes is not a novel concept, yet there is a lack of methods and tools for assessing earthquake's impacts upon the regional hydrology and agricultural systems. The objective of this paper is to describe how remote sensing imagery, methods and tools allow detecting crop responses and damage incurred after earthquakes because a change in the regional hydrology. Many remote sensing datasets are long archived with extensive coverage and with well-documented methods to assess plant-water relations. We thus connect remote sensing of plant water relations to its utility in agriculture using a post-earthquake agrohydrologic remote sensing (PEARS) framework; specifically in agro-hydrologic relationships associated with recent earthquake events that will lead to improved water management. - Highlights: • Remote sensing to improve agricultural disaster management • Introduce post-earthquake agrohydrologic remote sensing (PEARS) framework • Apply PEARS framework to 2010 Maule Earthquake in Central Chile

  12. On earthquake risk for nuclear powerplants in a non-seismic region

    International Nuclear Information System (INIS)

    Hjelme, J.

    1976-01-01

    Reports on earthquakes felt in Denmark have been analysed. In several cases the epicenter is located elsewhere. In some cases no location could be found, but it is certain that no epicenters are located in Denmark. This makes the definition of Design Earthquake less suitable for studies on earthquake effects. The use of Calculated Risk is demonstrated and the different steps in the procedure are discussed

  13. Risk management versus incentives

    International Nuclear Information System (INIS)

    Aven, E.; Lovas, K.; Osmundsen, P.

    2006-01-01

    Portfolio theory indicates that risk management should take place at the group level. Hedging at the project level or in the individual business areas may lead to suboptimal results. However, the efficiency of a profit centre depends on its management's being able to influence factors that are crucial to the unit's financial results. Price hedging could be one such factor. In the wider perspective, this constitutes part of the balancing between centralisation and decentralisation. This article covers important elements of risk management and incentive design. It goes on to discuss the balancing of overall risk management at the group level and incentive design in profit centres and corporate units. Throughout the article, the oil industry serves as a case. (author)

  14. Governmental management of chemical risk

    International Nuclear Information System (INIS)

    Zimmerman, R.

    1990-01-01

    This book is organized under the following headings: risk management in the government context; legal and regulatory decrees and directives for managing chemical risk; incentive-based approaches for regulating risk; risk management in the federal system; and traditional approaches and new initiatives for managing chemical risk

  15. Necessity of management for minor earthquake to improve public acceptance of nuclear energy in South Korea

    Directory of Open Access Journals (Sweden)

    Hyun-Tae Choi

    2018-04-01

    Full Text Available As public acceptance of nuclear energy in Korea worsens due to the Fukushima accident and the earthquakes that occurred in the Gyeongju area near the Wolsong nuclear power plant (NPP, estimating the effects of earthquakes has become more essential for the nuclear industry. Currently, most countermeasures against earthquakes are limited to large-scale disasters. Minor-scale earthquakes used to be ignored. Even though people do not feel the shaking due to minor earthquakes and minor earthquakes incur little damage to NPPs, they can change the environmental conditions, for instance, underground water level and the conductivity of the groundwater. This study conducted a questionnaire survey of residents living in the vicinity of an NPP to determine their perception and acceptance of plant safety against minor earthquakes. The results show that the residents feel earthquakes at levels that can be felt by people, but incur little damage to NPPs, as minor earthquakes (magnitude of 2.0–3.9 and set this level as a standard for countermeasures. Even if a minor earthquake has little impact on the safety of an NPP, there is still a possibility that public opinion will get worse. This study provides analysis results about problems of earthquake measures of Korean NPPs and specific things that can bring about an effect of deterioration of public acceptance. Based on these data, this article suggests that active management of minor earthquakes is necessary for the sustainability of nuclear energy. Keywords: Earthquake Measures, Management, Minor Earthquake, Nuclear Energy, Public Acceptance

  16. Managing power risk

    International Nuclear Information System (INIS)

    Rudd, D.C.

    1999-01-01

    Issues regarding the management of financial risks in the electric power market were discussed. The nature of the risk was defined for electricity producers, local utilities, traders/dealers, and brokers, each of which are exposed to different types of risks with the exception of credit risk, which is common to all. The main features of options, swaps, CFDs, bilateral financial contracts, futures contracts and the terms of the NYMEX electricity contract were outlined. Basic derivative strategies, the role of the broker, the elements of emissions trading, and trading strategies for consumers were also explained. 3 fig

  17. Overview of the critical disaster management challenges faced during Van 2011 earthquakes.

    Science.gov (United States)

    Tolon, Mert; Yazgan, Ufuk; Ural, Derin N; Goss, Kay C

    2014-01-01

    On October 23, 2011, a M7.2 earthquake caused damage in a widespread area in the Van province located in eastern Turkey. This strong earthquake was followed by a M5.7 earthquake on November 9, 2011. This sequence of damaging earthquakes led to 644 fatalities. The management during and after these earthquake disaster imposed many critical challenges. In this article, an overview of these challenges is presented based on the observations by the authors in the aftermath of this disaster. This article presents the characteristics of 2011 Van earthquakes. Afterward, the key information related to the four main phases (ie, preparedness, mitigation, response, and recovery) of the disaster in Van is presented. The potential strategies that can be taken to improve the disaster management practice are identified, and a set of recommendations are proposed to improve the existing situation.

  18. Risk Management Practices: The Ghanaian Firms' Perspective ...

    African Journals Online (AJOL)

    1) understanding risk and risk management, (2) risk identification, (3) risk assessment and methods employed in managing risks (4) implementation of risk management methods, (5) risk monitoring and (6) future prospect of risk management.

  19. Seismic risk analysis of small earthquakes induced by hydrocarbon production in the Netherlands

    NARCIS (Netherlands)

    Wassing, B.B.T.; Waarts, P.H.; Roos, W.; Nepveu, M.; Muntendam-Bos, A.G.; Eck, T. van

    2010-01-01

    In the northern parts of The Netherlands, the exploitation of gas fields has induced small earthquakes. These induced earthquakes have occasionally caused damage to buildings. A workflow was developed in order to evaluate the seismic risk of the exploitation of hydrocarbon fields. A Bayesian

  20. Change of Japanese risk perception after Tohoku earthquake March 11, 2011

    International Nuclear Information System (INIS)

    Nakajima, Reiko

    2011-01-01

    The present study reports change of Japanese risk perception based on the results of national surveys carried out in 2010 and 2011. Major earthquake and nuclear power plant risk items were perceived much more serious, while other risks such as global warming, illicit drugs, terrorism were perceiver less serious, after Tohoku earthquake. Anxiety about radiological material was differently according to the distance from the Fukushima No. 1 nuclear power plant. (author)

  1. Risk assessment study of fire following earthquake: a case study of petrochemical enterprises in China

    Science.gov (United States)

    Li, J.; Wang, Y.; Chen, H.; Lin, L.

    2013-04-01

    After an earthquake, the fire risk of petrochemistry enterprises is higher than that of other enterprises as it involves production processes with inflammable and explosive characteristics. Using Chinese petrochemical enterprises as the research object, this paper uses a literature review and case summaries to study, amongst others, the classification of petrochemical enterprises, the proportion of daily fires, and fire loss ratio. This paper builds a fire following earthquake risk assessment model of petrochemical enterprises based on a previous earthquake fire hazard model, and the earthquake loss prediction assessment method, calculates the expected loss of the fire following earthquake in various counties and draws a risk map. Moreover, this research identifies high-risk areas, concentrating on the Beijing-Tianjin-Tangshan region, and Shandong, Jiangsu, and Zhejiang provinces. Differences in enterprise type produce different levels and distribution of petrochemical enterprises earthquake fire risk. Furthermore, areas at high risk of post-earthquake fires and with low levels of seismic fortification require extra attention to ensure appropriate mechanisms are in place.

  2. Risk assessment study of fire following an earthquake: a case study of petrochemical enterprises in China

    Science.gov (United States)

    Li, J.; Wang, Y.; Chen, H.; Lin, L.

    2014-04-01

    After an earthquake, the fire risk of petrochemical enterprises is higher than that of other enterprises as it involves production processes with inflammable and explosive characteristics. Using Chinese petrochemical enterprises as the research object, this paper uses a literature review and case summaries to study, amongst others, the classification of petrochemical enterprises, the proportion of daily fires, and fire loss ratio. This paper builds a fire following an earthquake risk assessment model of petrochemical enterprises based on a previous earthquake fire hazard model, and the earthquake loss prediction assessment method, calculates the expected loss of the fire following an earthquake in various counties and draws a risk map. Moreover, this research identifies high-risk areas, concentrating on the Beijing-Tianjin-Tangshan region, and Shandong, Jiangsu, and Zhejiang provinces. Differences in enterprise type produce different levels and distribution of petrochemical enterprise earthquake fire risk. Furthermore, areas at high risk of post-earthquake fires and with low levels of seismic fortification require extra attention to ensure appropriate mechanisms are in place.

  3. Managing risk at Hanford

    International Nuclear Information System (INIS)

    Hesser, W.A.; Stillwell, W.G.; Rutherford, W.A.

    1994-01-01

    Clearly, there is sufficient motivation from Washington for the Hanford community to pay particular attention to the risks associated with the substantial volumes of radiological, hazardous, and mixed waste at Hanford. But there is also another reason for emphasizing risk: Hanford leaders have come to realize that their decisions must consider risk and risk reduction if those decisions are to be technically sound, financially affordable, and publicly acceptable. The 560-square miles of desert land is worth only a few thousand dollars an acre (if that) -- hardly enough to justify the almost two billion dollars that will be spent at Hanford this year. The benefit of cleaning up the Hanford Site is not the land but the reduction of potential risk to the public and the environment for future generations. If risk reduction is our ultimate goal, decisions about priority of effort and resource allocation must consider those risks, now and in the future. The purpose of this paper is to describe how Hanford is addressing the issues of risk assessment, risk management, and risk-based decision making and to share some of our experiences in these areas

  4. Investigation of risk management auditing

    International Nuclear Information System (INIS)

    Cao Lu

    2012-01-01

    2004, COSO published 'Enterprise Risk Management Framework', 2009, SASAC issued the 'central enterprise-wide risk management guidelines' to promote risk management within the formal state-owned enterprises in medium and large. Nuclear Group, which risk management in all branches to carry out the project homeopathic, and A Ⅱ will carry out risk management program as the first unit has accumulated more experience. This article from the perspective of internal control, based on the company's risk management practices carried out to try for the nuclear power enterprise risk management audit to describe and propose new ideas. Which expounds the significance of risk management, audit, risk management audit of the ways and means, for practical application of risk management audit of a representative summary of the issues and the ways and means to solve the problem of forward-looking recommendations. (authors)

  5. Disaster Risk Management of Urban Systems

    Directory of Open Access Journals (Sweden)

    Ana-Diana Ancaş

    2006-01-01

    Full Text Available Evaluating the risk of natural disasters is an intensely debated issue, both on national and international level. In the present paper, after a brief review of the international research in this field and an introduction in risk management, we insisted on risk analysis of an urban area, called urban system. More precisely, we investigated the evaluation of risk and the behavior of the pipelines infrastructure characteristic in an urban area during an earthquake.By taking into account a certain region in Jassy city area, we present a methodology of evaluating seismic risk of the utilities network of the region. The method consists in establishing the necessary steps to be taken in such an evaluation. These steps are also graphically displayed for the gas pipelines of the area, and emphasizing the critical points existent in that sector e.g. gas stations. Using the cellular automata technique, inspired from the artificial intelligence and complex system fields, based on the GIS map of the analysed region, we obtained a map with the risk areas in case of an earthquake, taking into account the gas pipelines network and the existing critical points.

  6. Earthquake Seismic Risk Reduction in Ohio: ODNR's Efforts to Address Issues with Natural and Induced Seismicity

    Science.gov (United States)

    Besana-Ostman, G. M.

    2013-05-01

    With the increasing concerns regarding both natural and induced seismicity in Ohio, ODNR (Ohio Department of Natural Resources) initial efforts on seismic risk reduction paved way to various changes and improvement to tackle several major issues. For natural earthquakes, regional seismicity indicates a NE-SW structure in the northern portion of the area associated with a number of moderate historical earthquakes but no active trace identified. On the other hand, earthquakes of 1986 and 2011 are most probably incidents of induced seismicity that trigger more public uproar against disposal of regulated waste waters through injections. ODNR, in efforts to adapt with increasing need to regulate all operations related to both the Utica and Marcellus shale play within the state, had recently strengthen itself both through additional human resources and improved infrastructure. Tougher regulations and additional field tests were required that took effect immediately when a M4 earthquake was associated with the operations of an injection well. Public meetings were undertaken focused on educating many local inhabitants related to oil and gas operations, hydraulic fracturing, injection wells, and seismicity. Trainings for new and existing staff were regularly done especially for field inspection, data management and technology advancements. Considering the existing seismic stations that are few and distant related to sites of the injection wells, additional seismic stations were installed to gather baseline data and monitor for earthquakes within the injection area(s). Furthermore, to assess if the sites of the injection wells are safe from active structures, initial geomorphic and structural analyses indicated possible active faults in the northern portion of state oriented NE-SW. With the above-mentioned recent changes, ODNR had made a significant leap not only in the improvement of its principal regulatory role in the state for oil and gas operations but also in its

  7. Children's Aquatics: Managing the Risk.

    Science.gov (United States)

    Langendorfer, Stephen; And Others

    1989-01-01

    This article identifies the major risks faced by young children in aquatic programs, outlines several methods for managing risk factors, and discusses the steps involved in implementing a risk-management system. (IAH)

  8. The Management Object in Risk Management Approaches

    DEFF Research Database (Denmark)

    Christiansen, Ulrik

    Using a systematic review of the last 55 years of research within risk management this paper explores how risk management as a management technology (methodologies, tools and frameworks to mitigate or manage risks) singles out risks as an object for management in order to make action possible....... The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse and calculate uncertainty and risk. Inspired by social studies of finance and accounting, the paper finally develops...... three propositions that illustrate how the framing of risk establishes a boundary for how managers might understand value creation and the possible future and how this impacts the possible responses to risk....

  9. Risk management in customs control

    OpenAIRE

    Drobot, Elena; Klevleeva, Aziza

    2016-01-01

    The particularities of risk-management system implementation within customs control are discussed in the article. The authors single out the elements of risk-management system, evaluate effectiveness of risk-management in customs control. The main reasons for non-implementation of risk-management system in customs control are described, as well. Particular attention is paid to the benefits of customs risk management.

  10. "Risk management" is a verb.

    Science.gov (United States)

    Sheppard, Faye

    2018-01-01

    To optimally demonstrate the value of risk management, our actions must show the benefits. The American Society for Healthcare Risk Management (ASHRM) board needs to provide support through tools and resources. ASHRM members must show through their actions the value of risk management. And ASHRM members need to show the organization where actions and activities should be focused in the future. Actions show the value of enterprise risk management. © 2018 American Society for Healthcare Risk Management of the American Hospital Association.

  11. Scenario-based earthquake hazard and risk assessment for Baku (Azerbaijan

    Directory of Open Access Journals (Sweden)

    G. Babayev

    2010-12-01

    Full Text Available A rapid growth of population, intensive civil and industrial building, land and water instabilities (e.g. landslides, significant underground water level fluctuations, and the lack of public awareness regarding seismic hazard contribute to the increase of vulnerability of Baku (the capital city of the Republic of Azerbaijan to earthquakes. In this study, we assess an earthquake risk in the city determined as a convolution of seismic hazard (in terms of the surface peak ground acceleration, PGA, vulnerability (due to building construction fragility, population features, the gross domestic product per capita, and landslide's occurrence, and exposure of infrastructure and critical facilities. The earthquake risk assessment provides useful information to identify the factors influencing the risk. A deterministic seismic hazard for Baku is analysed for four earthquake scenarios: near, far, local, and extreme events. The seismic hazard models demonstrate the level of ground shaking in the city: PGA high values are predicted in the southern coastal and north-eastern parts of the city and in some parts of the downtown. The PGA attains its maximal values for the local and extreme earthquake scenarios. We show that the quality of buildings and the probability of their damage, the distribution of urban population, exposure, and the pattern of peak ground acceleration contribute to the seismic risk, meanwhile the vulnerability factors play a more prominent role for all earthquake scenarios. Our results can allow elaborating strategic countermeasure plans for the earthquake risk mitigation in the Baku city.

  12. SEISMIC RISK CARTOGRAPHIC VISUALIZATION FOR CRISIS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nina I. Frolova

    2014-01-01

    Full Text Available Earthquake loss estimations before future events and following strong earthquakesin emergency mode and their corresponding visualization are extremely important for properdecision on preventive measures and effective response in order to save lives and properties. The paper addresses the methodological issues of seismic risk and vulnerability assessment, mapping with GIS technology application. Requirements for simulation models,databases used at different levels, as well as ways of visualizations oriented for EmergencyManagement Agencies, as well federal and local authorities are discussed. Examples ofmapping at the different levels: global, country, region and urban one are given and theinfluence of input data uncertainties on the reliability of loss computations is analyzed.

  13. Environmental risk evaluation to minimize impacts within the area affected by the Wenchuan earthquake

    International Nuclear Information System (INIS)

    Du, Pengfei; Chen, Jining; Chen, Chao; Liu, Yi; Liu, Jianguo; Wang, Hongtao; Zhang, Xiaojian

    2012-01-01

    Earthquakes can be devastating to built infrastructure and the natural environment, as evidenced by the March 2011, M = 9.0 earthquake, and subsequent tsunami, in Japan. As seen in the Japanese event, environmental damage caused by secondary disasters (tsunami, leakage from a nuclear reactor) can equal or exceed the impacts of the primary event. In order to develop an environmental assessment system to examine secondary disasters, a comprehensive environmental impact evaluation was conducted after the Wenchuan earthquake that occurred on 12 May 2008 in the Sichuan Province, China. This evaluation focused on several key environmental elements such as wastewater, drinking water, soil, solid waste, radiation, and ecosystem-level effects. As part of this assessment, an analysis of root causes and potential solutions was conducted for key issues such as population relocation and resettlement in temporary dwellings, recovery of environmental protection functions, industrial development strategies and production recovery. Methods for post-quake environmental assessment were developed, utilizing GIS-based techniques for spatial evaluation of primary and secondary disaster patterns. The goal of this exercise was the development of effective assessment methods that can be rapidly applied in a post-disaster situation to reduce and mitigate damage caused by secondary disasters, and facilitate the recovery of impaired environmental management structure and function. - Highlights: ► A comprehensive post-quake environmental risk evaluation system was developed. ► The research identifies potential long-term environmental risks in many aspects. ► The research analyzes potential solutions for many typical post-disaster issues. ► Effective assessment methods can be applied in a post-disaster situation to reduce damage caused by secondary disasters.

  14. Rapid landslide risk assessment of transport infrastructure following the 13 November 2016 Kaikoura, New Zealand, earthquake

    Science.gov (United States)

    Robinson, Tom; Rosser, Nick

    2017-04-01

    Earthquake-generated landslides pose a significant risk to critical infrastructure, especially transport networks. For post-earthquake emergency response, identifying where landslides have affected transport networks is vital for understanding the ground access available to affected locations. However, post-earthquake landslide mapping is a difficult and time-consuming task, hindered by issues relating to the collection and processing of satellite images, cloud cover, and manual mapping. The development of rapid landslide modelling techniques for post-earthquake application can allow landslide hazard and risk to be modelled within hours of the earthquake occurring, leading to faster understanding of the likely losses to transport infrastructure. This study presents the results of efforts to rapidly model the extent of and losses related to landsliding following the 13 November 2016 Kaikoura earthquake in New Zealand. Using previously published data on landslide pre-disposing factors, the landslide hazard resulting from this earthquake was modelled in order to identify locations where landslides were most likely. This was combined with a simple horizon-scanning method along critical transport lines to identify zones in which landslides could potentially impact the networks. Landslide hazard in these zones was subsequently weighted by the reach angle to the respective network and averaged for the entire zone. The results show the relative risk of landslides impacting different sections of the transport networks and were derived within 48 hours of the earthquake occurring. These models rapidly and correctly highlighted the numerous blockages along the vital State Highway 1 link between Christchurch and Kaikoura, as well as those on the only alternative inland route. This demonstrates that accurate and rapid analysis of landslide losses can be undertaken immediately post-earthquake, with results potentially available within hours of the event, far sooner than current

  15. Risk factors of post-traumatic stress disorder (PTSD) after Wenchuan earthquake: a case control study.

    Science.gov (United States)

    Cheng, Yongzhong; Wang, Fang; Wen, Jin; Shi, Yingkang

    2014-01-01

    Few clues were found in the literature about the independent risk factors for PTSD among earthquake survivors in Sichuan province three years after the 2008 earthquake. Ours was the first case-control study with matching factors of age and distance from the epicenter among survivors age 16 years or older, three years after the catastrophe. To identify independent risk factors for PTSD among earthquake survivors. We performed a population-based matched case-control study. The cases were drawn from earthquake areas three years after the Wenchuan earthquake, including 113 cases who met positive criteria for PTSD symptoms according to the PCL-C (PTSD Checklist-Civilian Version) score and 452 controls who did not meet the criteria. Cases and controls were matched individually by birth year (+ three years) and the town they lived in when the earthquake occurred. Independent risk factors for PTSD symptoms included two-week disease prevalence (odds ratio [OR],1.92; 95% confidence interval [CI],1.18-3.13), witnessing someone being killed in the earthquake (OR, 2.04;95%CI, 1.17-3.58), having no regular income after the earthquake (OR, 0.52; 95%CI, 0.28-0.98), receiving mental health support only one time after the earthquake (OR, 2.43; 95%CI, 1.09-5.42) and lower social support (lower PSSS score) (OR, 0.95; 95%CI, 0.93-0.97). Earthquake experience, suffering from physical illnesses, lack of stable income, and lower social support were associated with PTSD symptoms.

  16. Nuclear risk management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This paper gives the list of contributions to Eurosafe 2001 which was organised around two round tables on the first day and five seminars on the second day. The first round table dealt with the technical, organisational and societal aspects of risk management aimed at the prevention of accidents in nuclear power plants. The second round table focused on radiological risks from the normal operation of nuclear installations. Special consideration has been given to the involvement of stakeholders. The five seminars were held in order to provide opportunities for comparing experiences and learning about recent activities of IRSN, GRS and their partners in the European Union and Eastern Europe: - Safety assessment and analysis of nuclear installations; -Nuclear safety research; -Environment and radiation protection; - Waste management; - Nuclear material security. (author)

  17. Nuclear risk management

    International Nuclear Information System (INIS)

    2001-01-01

    This paper gives the list of contributions to Eurosafe 2001 which was organised around two round tables on the first day and five seminars on the second day. The first round table dealt with the technical, organisational and societal aspects of risk management aimed at the prevention of accidents in nuclear power plants. The second round table focused on radiological risks from the normal operation of nuclear installations. Special consideration has been given to the involvement of stakeholders. The five seminars were held in order to provide opportunities for comparing experiences and learning about recent activities of IRSN, GRS and their partners in the European Union and Eastern Europe: - Safety assessment and analysis of nuclear installations; -Nuclear safety research; -Environment and radiation protection; - Waste management; - Nuclear material security. (author)

  18. Credit risk management in banks

    OpenAIRE

    Pětníková, Tereza

    2014-01-01

    The subject of this diploma thesis is managing credit risk in banks, as the most significant risk faced by banks. The aim of this work is to define the basic techniques, tools and methods that are used by banks to manage credit risk. The first part of this work focuses on defining these procedures and describes the entire process of credit risk management, from the definition of credit risk, describing credit strategy and policy, organizational structure, defining the most used credit risk mi...

  19. Managing Complex Environmental Risks

    International Nuclear Information System (INIS)

    Karlsson, Mikael

    2006-01-01

    Environmental and public health risks are often handled in a process in which experts, and sometimes policy makers, try their best to quantitatively assess, evaluate and manage risks. This approach harmonises with mainstream interpretations of sustainable development, which aim at defining a desirable relationship between human and natural systems, for instance by policies that define limit values of different forms of disturbances. However, under conditions of high scientific incertitude, diverging values and distrust, this approach is far from satisfactory. The use of cell phones, hazardous chemicals, nuclear or fossil energy systems, and modern biotechnology are examples of activities causing such risks with high complexity. Against this background, a complementary interpretation of the concept of sustainable development is suggested. This interpretation is operationalised through new formulations of three common principles for public risk management; the precautionary principle, the polluter pays principle and the principle of public participation. Implementation of these reformulated principles would challenge some foundations of present mainstream views on environmental decision-making, but would on the other hand contribute to improved practices for long-term human welfare and planetary survival (full text of contribution)

  20. The Management Object in Risk Management Approaches

    DEFF Research Database (Denmark)

    Christiansen, Ulrik

    . The paper synthesise by developing a framework of how different views on risk management enable and constrain the knowledge about risk and thus frame the possibilities to measure, analyse and calculate uncertainty and risk. Inspired by social studies of finance and accounting, the paper finally develops...... three propositions that illustrate how the framing of risk establishes a boundary for how managers might understand value creation and the possible future and how this impacts the possible responses to risk....

  1. Effective risk management SOGO life cycle management

    OpenAIRE

    Ali, Mohamed Omar

    2012-01-01

    Master's thesis in Industrial Economics After new or upgrade projects the offshore installation gets maintenance or support through the life cycle management organization at Siemens. Small to medium modification projects are executed by the life cycle management. Risk assessment on these projects show different risks when it comes to estimation and pricing of projects, planning and executing, resource management, competence and knowledge.

  2. CEA - 2014 risk management assessment

    International Nuclear Information System (INIS)

    Bonnevie, Edwige; Verwaerde, Daniel; Maillot, Bernard

    2015-06-01

    After introducing presentations of CEA managers in charge of risk management and controls, this document presents and comments the actions undertaken by the CEA and the obtained results in terms of risk management in different fields: protection and control of the environment, installation safety, health, safety and radiation protection, transport of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of legal risks, internal audits and controls. Other topics are addressed like the presentation of the risk management department, and the role of the CEA in the relationship between research and industry

  3. CEA: risk management assessment 2011

    International Nuclear Information System (INIS)

    Bigot, Bernard; Bonnevie, Edwige; Maillot, Bernard

    2012-01-01

    This report proposes a qualitative and quantitative overview of CEA activities in the field of risk management during 2011. These activities concerned the impact on the environment, the safety of installations, the management of professional risks (safety and health at work), the radiological protection of workers, the transports of hazardous materials, waste management, protection of sites, installations and heritage, the management of emergency situations, the management of law risks, controls and audits

  4. Earthquake Early Warning Management based on Client-Server using Primary Wave data from Vibrating Sensor

    Science.gov (United States)

    Laumal, F. E.; Nope, K. B. N.; Peli, Y. S.

    2018-01-01

    Early warning is a warning mechanism before an actual incident occurs, can be implemented on natural events such as tsunamis or earthquakes. Earthquakes are classified in tectonic and volcanic types depend on the source and nature. The tremor in the form of energy propagates in all directions as Primary and Secondary waves. Primary wave as initial earthquake vibrations propagates longitudinally, while the secondary wave propagates like as a sinusoidal wave after Primary, destructive and as a real earthquake. To process the primary vibration data captured by the earthquake sensor, a network management required client computer to receives primary data from sensors, authenticate and forward to a server computer to set up an early warning system. With the water propagation concept, a method of early warning system has been determined in which some sensors are located on the same line, sending initial vibrations as primary data on the same scale and the server recommended to the alarm sound as an early warning.

  5. Risk Management in Cocurricular Activities.

    Science.gov (United States)

    Webb, Edward M.

    1988-01-01

    Discusses risk management for colleges' cocurricular activities. Discusses tort liability, contributory negligence, and assumption of risk. Provides six concrete steps for managing risks responsibly and professionally: adopting an educational mission statement, assigning risk to others, establishing safety standards, training club advisors,…

  6. Managing Corruption Risks

    DEFF Research Database (Denmark)

    Krause Hansen, Hans

    2011-01-01

    This article investigates the emerging engagement of private actors and specifically Western corporations in international anti-corruption, drawing on Foucauldian studies of governmentality. It explores this engagement as governing practices that have emanated quite independently from the inter......-state system commonly understood to be at the core of the anti-corruption regime. It demonstrates how corporate anti-corruption ties in with a relatively new way of perceiving corruption. In this framing, anti-corruption comes out as risk management, which is latched on to notions of corporate social...... responsibility and business ethics. Moreover, the constitution of corruption risk relates to the rise of new actors and networks engaged in a wider business of anti-corruption, including commercial and hybrid actors that supply corporations with managerial instruments, benchmarks for best practice, rankings...

  7. Knowledge management: an innovative risk management strategy.

    Science.gov (United States)

    Zipperer, Lorri; Amori, Geri

    2011-01-01

    Knowledge management effectively lends itself to the enterprise risk process. The authors introduce the concept of knowledge management as a strategy to drive innovation and support risk management. They align this work with organizational efforts to improve patient safety and quality through the effective sharing of experience and lessons learned. The article closes with suggestions on how to develop a knowledge management initiative at an organization, who should be on the team, and how to sustain this effort and build the culture it requires to drive success. © 2011 American Society for Healthcare Risk Management of the American Hospital Association.

  8. Managing Climate Change Risks

    Energy Technology Data Exchange (ETDEWEB)

    Jones, R. [CSIRO Atmospheric Research, PMB1 Aspendale, Victoria 3195 (Australia)

    2003-07-01

    Issues of uncertainty, scale and delay between action and response mean that 'dangerous' climate change is best managed within a risk assessment framework that evolves as new information is gathered. Risk can be broadly defined as the combination of likelihood and consequence; the latter measured as vulnerability to greenhouse-induced climate change. The most robust way to assess climate change damages in a probabilistic framework is as the likelihood of critical threshold exceedance. Because vulnerability is dominated by local factors, global vulnerability is the aggregation of many local impacts being forced beyond their coping ranges. Several case studies, generic sea level rise and temperature, coral bleaching on the Great Barrier Reef and water supply in an Australian catchment, are used to show how local risk assessments can be assessed then expressed as a function of global warming. Impacts treated thus can be aggregated to assess global risks consistent with Article 2 of the UNFCCC. A 'proof of concept' example is then used to show how the stabilisation of greenhouse gases can constrain the likelihood of exceeding critical thresholds at both the both local and global scale. This analysis suggests that even if the costs of reducing greenhouse gas emissions and the benefits of avoiding climate damages can be estimated, the likelihood of being able to meet a cost-benefit target is limited by both physical and socio-economic uncertainties. In terms of managing climate change risks, adaptation will be most effective at reducing vulnerability likely to occur at low levels of warming. Successive efforts to mitigate greenhouse gases will reduce the likelihood of reaching levels of global warming from the top down, with the highest potential temperatures being avoided first, irrespective of contributing scientific uncertainties. This implies that the first cuts in emissions will always produce the largest economic benefits in terms of avoided

  9. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  10. Risk management in anesthesia.

    Science.gov (United States)

    Cabrini, L; Levati, A

    2009-11-01

    Anesthesia is considered a leading discipline in the field of patient safety. Nevertheless, complications still occur and can be devastating. A substantial portion of anesthesia-related adverse events are preventable since risk factors can be detected and eliminated. Risk management (RM) in anesthesia includes preventive and remedial measures to minimize patient anesthesia-related morbidity and mortality. RM involves all aspects of anesthesia care. Classically, the following four steps are needed to prevent critical incidents or to learn from them: (1) detection of problems, (2) assessment, (3) implementation of solutions, and (4) verification of effectiveness. Problems and solutions can be identified into the fields of structures, processes and personnel. Authoritative agencies like the World Health Organization, the World Federation of Societies of Anesthesiologists, the Section and Board of Anesthesiology of the European Union of Medical Specialties and the Italian Scientific Society of Anesthesiologists (Società Italiana di Anestesia, Analgesia, Rianimazione e Terapia Intensiva SIAARTI) have proposed initiatives addressing safety in the operating room. The central role of a well-trained, constantly present anesthesiologist and the usefulness of checklists have been highlighted. Cost cutting and production pressure in medical care are potential threats to safety. A shared knowledge of the best standards of care and of the potential consequences of unscrupulous actions could make the daily management of conflicting interests easier. A correctly applied RM can be a powerful, highly beneficial aid to our practice.

  11. Credit derivatives and risk management

    OpenAIRE

    Michael S. Gibson

    2007-01-01

    The striking growth of credit derivatives suggests that market participants find them to be useful tools for risk management. I illustrate the value of credit derivatives with three examples. A commercial bank can use credit derivatives to manage the risk of its loan portfolio. An investment bank can use credit derivatives to manage the risks it incurs when underwriting securities. An investor, such as an insurance company, asset manager, or hedge fund, can use credit derivatives to align its...

  12. Managing information technology security risk

    Science.gov (United States)

    Gilliam, David

    2003-01-01

    Information Technology (IT) Security Risk Management is a critical task for the organization to protect against the loss of confidentiality, integrity and availability of IT resources. As systems bgecome more complex and diverse and and attacks from intrusions and malicious content increase, it is becoming increasingly difficult to manage IT security risk. This paper describes a two-pronged approach in addressing IT security risk and risk management in the organization: 1) an institutional enterprise appraoch, and 2) a project life cycle approach.

  13. Future scenarios for earthquake and flood risk in Eastern Europe and Central Asia

    Science.gov (United States)

    Murnane, R. J.; Daniell, J. E.; Schäfer, A. M.; Ward, P. J.; Winsemius, H. C.; Simpson, A.; Tijssen, A.; Toro, J.

    2017-07-01

    We report on a regional flood and earthquake risk assessment for 33 countries in Eastern Europe and Central Asia. Flood and earthquake risk were defined in terms of affected population and affected gross domestic product (GDP). Earthquake risk was also quantified in terms of fatalities and capital loss. Estimates of future population and GDP affected by earthquakes vary significantly among five shared socioeconomic pathways that are used to represent population and GDP in 2030 and 2080. There is a linear relationship between the future relative change in a nation's exposure (population or GDP) and its future relative change in annual average population or GDP affected by earthquakes. The evolution of flood hazard was quantified using a flood model with boundary conditions derived from five different general circulation models and two representative concentration pathways, and changes in population and GDP were quantified using two shared socioeconomic pathways. There is a nonlinear relationship between the future relative change in a nation's exposure (population or GDP) and its future relative change in its annual average population or GDP affected by floods. Six regions can be defined for positive and negative relative change in population that designate whether climate change can temper, counter, or reinforce relative changes in flood risk produced by changes in population or exposure. The departure from the one-to-one relationship between a relative change in a nation's population or GDP and its relative change in flood risk could be used to inform further efforts at flood mitigation and adaptation.

  14. The risk communication using the special website of the society of risk analysis for the Great East Japan Earthquake

    International Nuclear Information System (INIS)

    Tsubokawa, Hiroaki; Nagasaka, Toshinari; Sunaga, Yohei; Lee, Taiyoung; Taguchi, Hitoshi; Usuda, Yuichiro

    2011-01-01

    The Society for Risk Analysis Japan built the special website that reply to the people who are concerning the risk related to the Great East Japan Earthquake occurred on March 11, 2011. Although, there were many risk communication activities between the specialists of the risk research and citizens on the website, there are some significant problems for the risk communication using the website. This report summarizes the result of our activity. (author)

  15. Societal and observational problems in earthquake risk assessments and their delivery to those most at risk

    Science.gov (United States)

    Bilham, Roger

    2013-01-01

    Losses from earthquakes continue to rise despite increasingly sophisticated methods to estimate seismic risk throughout the world. This article discusses five specific reasons why this should be. Loss of life is most pronounced in the developing nations where three factors - poverty, corruption and ignorance - conspire to reduce the effective application of seismic resistant codes. A fourth reason is that in many developing nations the application of seismic resistant construction is inadvertently restricted to wealthy, or civil segments of the community, and is either unobtainable or irrelevant to the most vulnerable segment of the public — the owner/occupiers of substandard dwellings. A fifth flaw in current seismic hazard studies is that sophisticated methodologies to evaluate risk are inappropriate in regions where strain rates are low, and where historical data are short compared to the return time of damaging earthquakes. The scientific community has remained largely unaware of the importance of these impediments to the development and application of appropriate seismic resistant code, and is ill-equipped to address them.

  16. Brief communication "Fast-track earthquake risk assessment for selected urban areas in Turkey"

    Directory of Open Access Journals (Sweden)

    D. Kepekci

    2011-02-01

    Full Text Available This study is presented as a contribution to earthquake disaster mitigation studies for selected cities in Turkey. The risk evaluations must be based on earthquake hazard analysis and city information. To estimate the ground motion level, data for earthquakes with a magnitude greater than 4.5 and an epicenter location within a 100-km radius of each city were used for the period from 1900 to 2006, as recorded at the Kandilli Observatory and Earthquake Research Institute. Probabilistic seismic hazard analysis for each city was carried out using Poisson probabilistic approaches. Ground motion level was estimated as the probability of a given degree of acceleration with a 10% exceedence rate during a 50-year time period for each city. The risk level of each city was evaluated using the number of houses, the per-capita income of city residents, population, and ground motion levels. The maximum risk level obtained for the cities was taken as a reference value for relative risk assessment, and other risk values were estimated relative to the maximum risk level. When the selected cities were classified according to their relative risk levels, the five most risky cities were found to be, in descending order of risk, Istanbul, Izmir, Ankara, Bursa, and Kocaeli.

  17. Developing Effective Earthquake Risk Reduction Strategies: The Potential Role of Academic Institutions in Lebanon

    Science.gov (United States)

    Baytiyeh, Hoda

    2015-01-01

    Lebanon faces the risk of powerful earthquakes with potentially devastating effects. However, the Lebanese people in general have not yet recognized this risk, as current educational programs and government officials have failed to inform them about it. This article discusses the essential role that Lebanese institutions of higher education should…

  18. Risk management in construction company

    OpenAIRE

    Nučič, Jernej

    2011-01-01

    In master's thesis I discuss the field of risk management process in construction projects from the viewpoint of a building contractor. I present risk overview, previous research in this area and a new approach to risk analysis in construction by project components. The proposed methodology for risk management in a construction company, described in this thesis is based on the proposed checklist. Proposed checklist includes all identified risks in terms of building contractor and ...

  19. Suicide risk among young children after the Great East Japan Earthquake: A follow-up study.

    Science.gov (United States)

    Fujiwara, Takeo; Yagi, Junko; Homma, Hiroaki; Mashiko, Hirobumi; Nagao, Keizo; Okuyama, Makiko

    2017-07-01

    On 11 March 2011, the Great East Japan Earthquake and subsequent tsunami hit East Japan. We aim to investigate the impact of trauma experiences related to the earthquake on suicide risk among young children, stratified by child sex. Participants at baseline were children who were exposed to the 2011 disaster at preschool age (affected area, n=198; unaffected area, n=82, total n=280). From July 2013 to May 2014, suicide risk was assessed using the Mini International Neuropsychiatric Interview for Children and Adolescents (MINI-KID) in a follow-up interview conducted by a child psychiatrist or psychologist (N=210, follow-up rate: 75%). Among young girls in the affected area, 12 out of 65 (18.5%) showed suicidal ideation, which is significantly higher than girls in the unaffected area (4.7%, p for chi-square=0.036). In the multivariate model adjusted for potential confounders and mediators, the odds ratio for 4 or more trauma experiences related to the earthquake was 5.74 (95% confidence interval: 0.83-39.6, p=0.076) compared to no trauma experience related to the earthquake. Among young boys, trauma exposure was not associated with suicidal ideation. Our findings showed that young girls who experienced earthquake-related trauma at preschool age had a higher suicidal ideation 3 years after the earthquake. Copyright © 2017. Published by Elsevier B.V.

  20. Urban earthquake hazard: perceived seismic risk and preparedness in Dhaka City, Bangladesh.

    Science.gov (United States)

    Paul, Bimal Kanti; Bhuiyan, Rejuan Hossain

    2010-04-01

    Bangladesh is vulnerable to seismic events. Experts suspect that if an earthquake with a 7.0 magnitude occurred in large cities of Bangladesh, there would be a major human tragedy due to the structural failure of many buildings. The primary objectives of this paper are to examine seismic risk perception among residents of Dhaka City and investigate their levels of earthquake preparedness. A questionnaire survey conducted among 444 residents of the city provided the major source of data for the paper. The survey results suggest that an overwhelming majority of the respondents were not prepared for a major earthquake, which is anticipated to occur in Dhaka. Multivariate analysis of survey data reveals that value of residential unit and respondent educational levels appear as the most significant determinants of preparedness status of the respondents. This study recommends increasing earthquake awareness and preparedness among residents of Dhaka City.

  1. Collapse risk of buildings in the Pacific Northwest region due to subduction earthquakes

    Science.gov (United States)

    Raghunandan, Meera; Liel, Abbie B.; Luco, Nicolas

    2015-01-01

    Subduction earthquakes similar to the 2011 Japan and 2010 Chile events will occur in the future in the Cascadia subduction zone in the Pacific Northwest. In this paper, nonlinear dynamic analyses are carried out on 24 buildings designed according to outdated and modern building codes for the cities of Seattle, Washington, and Portland, Oregon. The results indicate that the median collapse capacity of the ductile (post-1970) buildings is approximately 40% less when subjected to ground motions from subduction, as compared to crustal earthquakes. Buildings are more susceptible to earthquake-induced collapse when shaken by subduction records (as compared to crustal records of the same intensity) because the subduction motions tend to be longer in duration due to their larger magnitude and the greater source-to-site distance. As a result, subduction earthquakes are shown to contribute to the majority of the collapse risk of the buildings analyzed.

  2. Framework for systematic risk management

    International Nuclear Information System (INIS)

    Knief, R.A.; Mahn, J.A.; Briant, V.S.; Lee, R.B.; Long, R.L.

    1991-01-01

    The first paper of the Symposium described GPU Nuclear's Risk Management Group (RMG) and the use of literature search and interviews in a extensive study of risk management. One of the most important goals of the study was to identify comprehensive approaches to managing risk in the nuclear and major high-technology industries. This paper discusses RMG's multi-step generic risk-management process consisting of the following steps to: identify hazards; screen hazards and identify preventive actions, including costs; evaluate hazards for severity, probable frequency, and cost of preventive actions; prioritize preventive actions (preference to high risk and low cost); implement preventive actions; monitor and provide feedback

  3. Communicating Earthquake Preparedness: The Influence of Induced Mood, Perceived Risk, and Gain or Loss Frames on Homeowners' Attitudes Toward General Precautionary Measures for Earthquakes.

    Science.gov (United States)

    Marti, Michèle; Stauffacher, Michael; Matthes, Jörg; Wiemer, Stefan

    2018-04-01

    Despite global efforts to reduce seismic risk, actual preparedness levels remain universally low. Although earthquake-resistant building design is the most efficient way to decrease potential losses, its application is not a legal requirement across all earthquake-prone countries and even if, often not strictly enforced. Risk communication encouraging homeowners to take precautionary measures is therefore an important means to enhance a country's earthquake resilience. Our study illustrates that specific interactions of mood, perceived risk, and frame type significantly affect homeowners' attitudes toward general precautionary measures for earthquakes. The interdependencies of the variables mood, risk information, and frame type were tested in an experimental 2 × 2 × 2 design (N = 156). Only in combination and not on their own, these variables effectively influence attitudes toward general precautionary measures for earthquakes. The control variables gender, "trait anxiety" index, and alteration of perceived risk adjust the effect. Overall, the group with the strongest attitudes toward general precautionary actions for earthquakes are homeowners with induced negative mood who process high-risk information and gain-framed messages. However, the conditions comprising induced negative mood, low-risk information and loss-frame and induced positive mood, low-risk information and gain-framed messages both also significantly influence homeowners' attitudes toward general precautionary measures for earthquakes. These results mostly confirm previous findings in the field of health communication. For practitioners, our study emphasizes that carefully compiled communication measures are a powerful means to encourage precautionary attitudes among homeowners, especially for those with an elevated perceived risk. © 2017 Society for Risk Analysis.

  4. Risk assessment and risk management in managed aquifer recharge

    CSIR Research Space (South Africa)

    Page, D

    2012-06-01

    Full Text Available This chapter presents the methodologies used for risk assessment and risk management in MAR in Australia and the European Union, qualitative and quantitative approaches adopted within the RECLAIM Water project and case studies where the outcomes...

  5. Changes in Cardiovascular Risk Factors After the Great East Japan Earthquake.

    Science.gov (United States)

    Ohira, Tetsuya; Nakano, Hironori; Nagai, Masato; Yumiya, Yui; Zhang, Wen; Uemura, Mayu; Sakai, Akira; Hashimoto, Shigeatsu

    2017-03-01

    The Great East Japan Earthquake occurred on March 11, 2011, and was followed by a nuclear accident at the Fukushima Daiichi Nuclear Power Plant. The government ordered a mandatory evacuation from the high radioactive concentration area in Fukushima. This evacuation may have forced many evacuees to change specific aspects of their lifestyles such as diet and physical activity, which in turn may lead to future incidence of lifestyle diseases such as cardiovascular diseases (CVDs). To address this concern, the association between the evacuation and changes in CVD risk factors before and after the disaster was examined in the Fukushima Health Management Survey. In the present study, we reviewed the results of longitudinal studies in the Fukushima Health Management Survey. The proportion of overweight/obese people and those with hypertension, diabetes mellitus, dyslipidemia, liver dysfunction, atrial fibrillation, and polycythemia increased after the disaster. Furthermore, the evacuation was associated with an increase of these cardiovascular risk factors. Therefore, evacuees may be more disposed to CVDs such as myocardial infarction and stroke after the disaster. The prevention of future CVDs among evacuees from Fukushima requires ongoing preventive programs for obesity, hypertension, diabetes mellitus, and dyslipidemia, in collaboration with local governments and communities.

  6. Understanding and managing risk attitude

    National Research Council Canada - National Science Library

    Hillson, David; Murray-Webster, Ruth

    2007-01-01

    ... This book highlights how risk attitude factors influence the human psyche, and carefully explains the impacts. Organisations seeking to dramatically improve the effectiveness of their risk management process will want to use this book's insights. Craig Peterson, President, PMI Risk Management SIG This book has prompted me to think more deeply as a change d...

  7. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  8. IMPLEMENTING A RISK MANAGEMENT STANDARD

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2013-01-01

    Full Text Available After risk management “conquered” more and more project managers’ minds and showed its benefits for business and programs, the need to have a global risk management standard has become a crucial issue in the world of risk management. But having a global risk management standard has been a big challenge, starting from the decision of developing the standard (March-June 2005, to the moment of publishing it, November 2009. So, developing the ISO 31000:2009 standard has been more or less like a bumpy ride. Apparently, the people involved in developing the global risk management standard understood from the very beginning that no challenges are too big, nor any tasks too small and that the task of having a new, comprehensive global risk management standard should be completed with excellence: defining the principles and the framework guiding the risk management process applicable for all type of organizations and for a wide range of activities. Coming up with a global standard should always be based on the real organizations’ needs and should fulfill real risk management requirements. The article is trying to present the pros and cons of risk management standard implementation, challenging the implementation process itself and the added value of implementing the standard due to the lack of implementation enablers, like risk culture, a real problem especially in an international environment.

  9. Integrated Earthquake Risk Assessment in the Kathmandu Valley - A Case Study

    Science.gov (United States)

    Schaper, Julia; Anhorn, Johannes; Khazai, Bijan; Nüsser, Marcus

    2013-04-01

    Rapid urban growth is a process which can be observed in cities worldwide. Managing these growing urban areas has become a major challenge for both governing bodies and citizens. Situated not only in a highly earthquake and landslide-prone area, but comprising also the cultural and political capital of Nepal, the fast expanding Kathmandu Valley in the Himalayan region is of particular interest. Vulnerability assessment has been an important tool for spatial planning in this already densely populated area. The magnitude 8.4 earthquake of Bihar in 1934 cost 8600 Nepalis their lives, destroyed 20% of the Kathmandu building stock and heavily damaged another 40%. Since then, Kathmandu has grown into a hub with over a million inhabitants. Rapid infrastructure and population growth aggravate the vulnerability conditions, particularly in the core area of Metropolitan Kathmandu. We propose an integrative framework for vulnerability and risk in Kathmandu Valley. In order to move towards a more systemic and integrated approach, we focus on interactions between natural hazards, physically engineered systems and society. High resolution satellite images are used to identify structural vulnerability of the building stock within the study area. Using object-based image analysis, the spatial dynamics of urban growth are assessed and validated using field data. Complementing this is the analysis of socio-economic attributes gained from databases and field surveys. An indicator-based vulnerability and resilience index will be operationalized using multi-attribute value theory and statistical methods such as principal component analysis. The results allow for a socio-economic comparison of places and their relative potential for harm and loss. The objective in this task is to better understand the interactions between nature and society, engineered systems and built environments through the development of an interdisciplinary framework on systemic seismic risk and vulnerability. Data

  10. Innovations in Quantitative Risk Management

    CERN Document Server

    Scherer, Matthias; Zagst, Rudi

    2015-01-01

    Quantitative models are omnipresent –but often controversially discussed– in todays risk management practice. New regulations, innovative financial products, and advances in valuation techniques provide a continuous flow of challenging problems for financial engineers and risk managers alike. Designing a sound stochastic model requires finding a careful balance between parsimonious model assumptions, mathematical viability, and interpretability of the output. Moreover, data requirements and the end-user training are to be considered as well. The KPMG Center of Excellence in Risk Management conference Risk Management Reloaded and this proceedings volume contribute to bridging the gap between academia –providing methodological advances– and practice –having a firm understanding of the economic conditions in which a given model is used. Discussed fields of application range from asset management, credit risk, and energy to risk management issues in insurance. Methodologically, dependence modeling...

  11. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  12. RISK MANAGEMENT IN CUSTOMS CONTROL

    Directory of Open Access Journals (Sweden)

    Elena Valerievna Drobot

    2017-06-01

    Full Text Available Customs administrations operating in the modern global economy are faced with a complex range of challenges. The prime responsibilities remain the collection of revenues and the protection of the society, but these demanding tasks must be performed effectively and efficiently, whilst at the same time facilitating the flow of legitimate goods. Risk management is a logical and systematic method of identifying, analyzing and managing risks. Risk management can be associated with any activity, function or process within the organization and will enable the organization to take advantage of opportunities and minimize potential losses. Minimization of the human factor in customs control through the implementation of non-intrusive inspection equipment can be very useful. The particularities of risk-management system (RMS implementation within customs control are discussed in the article. The authors single out the elements of the risk-management system, evaluate the effectiveness of risk-management in customs control. The main reasons for non-implementation of the risk-management system in customs control are described as well. The particular attention is paid to the benefits of customs risk management. The authors’ hypothesis is that risk management in customs control must find a balance between costs and benefits to address all risks equally. Criteria are needed to decide what constitutes an acceptable or unacceptable risk. Thus, system analysis and risk management system are the effective mechanisms for acceleration of customs clearance and improve the quality of customs control. As a conclusion, the authors give recommendations for the improvement of the effectiveness of risk management system in customs control.

  13. Seeking Information after the 2010 Haiti Earthquake: A Case Study in Mass-Fatality Management

    Science.gov (United States)

    Gupta, Kailash

    2013-01-01

    The 2010 earthquake in Haiti, which killed an estimated 316,000 people, offered many lessons in mass-fatality management (MFM). The dissertation defined MFM in seeking information and in recovery, preservation, identification, and disposition of human remains. Specifically, it examined how mass fatalities were managed in Haiti, how affected…

  14. Risk management and corporate value

    Directory of Open Access Journals (Sweden)

    Milan Cupic

    2015-12-01

    Full Text Available The paper presents a theoretical framework for assessing the impact of risk management on corporate value. As the relevant factors that determine this impact, the paper analyzes market imperfections and investors’ risk aversion. The results of the present research indicate that risk management contributes to an increase in corporate value if, under the influence of market imperfections, corporate risk exposure is concave. As an expression of market imperfections, the paper analyzes the costs of financial distress, agency costs, and taxation. The results of the research also indicate that the risk management policy should not aim to minimize, but rather optimize risk exposure, by taking into account the costs of risk management, investors’ risk aversion and the competitive advantage a corporation has on the relevant market.

  15. Risk Management in Logystics Chains

    OpenAIRE

    Butrin, Andrey; Vikulov, Vladimir

    2013-01-01

    Article is devoted to risk management of supply chain. The authors considered indicators of supply chain risks, including risks caused by supplier. Authors formed a method of optimizing the level of supply chain risk in the integration with suppliers and customers.

  16. Improving Information Security Risk Management

    Science.gov (United States)

    Singh, Anand

    2009-01-01

    manaOptimizing risk to information to protect the enterprise as well as to satisfy government and industry mandates is a core function of most information security departments. Risk management is the discipline that is focused on assessing, mitigating, monitoring and optimizing risks to information. Risk assessments and analyses are critical…

  17. Challenges to sustainable risk management

    Energy Technology Data Exchange (ETDEWEB)

    Pinto, Ariel C., Aurora, Ashish, Hall, Dennis E.,

    2004-08-09

    This paper summarizes the intermediate lessons learned from the analyses of the risk management problems in three technological endeavors. These problems are: the absence of a structure for rewarding successful project risk management; the need for an ever-more accurate economic measure of risk; and the difficulty of transferring risks to contract-bound independent outsourcing entity. This paper also describes recent advancement towards providing answers to these challenges and future research endeavors in this field.

  18. The MCE (Maximum Credible Earthquake) - an approach to reduction of seismic risk

    International Nuclear Information System (INIS)

    Asmis, G.J.K.; Atchison, R.J.

    1979-01-01

    It is the responsibility of the Regulatory Body (in Canada, the AECB) to ensure that radiological risks resulting from the effects of earthquakes on nuclear facilities, do not exceed acceptable levels. In simplified numerical terms this means that the frequency of an unacceptable radiation dose must be kept below 10 -6 per annum. Unfortunately, seismic events fall into the class of external events which are not well defined at these low frequency levels. Thus, design earthquakes have been chosen, at the 10 -3 - 10 -4 frequency level, a level commensurate with the limits of statistical data. There exists, therefore, a need to define an additional level of earthquake. A seismic design explicitly and implicitly recognizes three levels of earthquake loading; one comfortably below yield, one at or about yield, and one at ultimate. The ultimate level earthquake, contrary to the first two, has been implicitly addressed by conscientious designers by choosing systems, materials and details compatible with postulated dynamic forces. It is the purpose of this paper to discuss the regulatory specifications required to quantify this third level, or Maximum Credible Earthquake (MCE). (orig.)

  19. Natural-technological risk assessment and management

    Science.gov (United States)

    Burova, Valentina; Frolova, Nina

    2016-04-01

    EM-DAT statistical data on human impact and economic damages in the 1st semester 2015 are the highest since 2011: 41% of disasters were floods, responsible for 39% of economic damage and 7% of events were earthquakes responsible for 59% of total death toll. This suggests that disaster risk assessment and management still need to be improved and stay the principle issue in national and international related programs. The paper investigates the risk assessment and management practice in the Russian Federation at different levels. The method is proposed to identify the territories characterized by integrated natural-technological hazard. The maps of the Russian Federation zoning according to the integrated natural-technological hazard level are presented, as well as the procedure of updating the integrated hazard level taking into account the activity of separate processes. Special attention is paid to data bases on past natural and technological processes consequences, which are used for verification of current hazard estimation. The examples of natural-technological risk zoning for the country and some regions territory are presented. Different output risk indexes: both social and economic, are estimated taking into account requirements of end-users. In order to increase the safety of population of the Russian Federation the trans-boundaries hazards are also taken into account.

  20. Managing the risks of risk management on large fires

    Science.gov (United States)

    Donald G. MacGregor; Armando. González-Cabán

    2013-01-01

    Large fires pose risks to a number of important values, including the ecology, property and the lives of incident responders. A relatively unstudied aspect of fire management is the risks to which incident managers are exposed due to organizational and sociopolitical factors that put them in a position of, for example, potential liability or degradation of their image...

  1. Lessons Learned from Data Management Activities after the Great East Japan Earthquake in March 2011

    Directory of Open Access Journals (Sweden)

    A Kitamoto

    2013-02-01

    Full Text Available This paper summarizes our effort towards managing the multi-disciplinary disaster-related data from the Great East Japan Earthquake, which happened on March 11, 2011 off the coast of Northeast Japan. This earthquake caused the largest tsunami in the recorded history of Japan, killed many people along the coast, and caused a nuclear disaster in Fukushima, which continues to affect a large area of Japan. Just after the earthquake, we started crisis response data management activities to provide useful information for supporting disaster response and recovery. This paper introduces the various types of datasets we made from the viewpoint of data management processing and draws lessons from our post-disaster activities.

  2. The Uncertainties of Risk Management

    DEFF Research Database (Denmark)

    Vinnari, Eija; Skærbæk, Peter

    2014-01-01

    for expanding risk management. More generally, such uncertainties relate to the professional identities and responsibilities of operational managers as defined by the framing devices. Originality/value – The paper offers three contributions to the extant literature: first, it shows how risk management itself......Purpose – The purpose of this paper is to analyse the implementation of risk management as a tool for internal audit activities, focusing on unexpected effects or uncertainties generated during its application. Design/methodology/approach – Public and confidential documents as well as semi......-structured interviews are analysed through the lens of actor-network theory to identify the effects of risk management devices in a Finnish municipality. Findings – The authors found that risk management, rather than reducing uncertainty, itself created unexpected uncertainties that would otherwise not have emerged...

  3. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  4. NGNP Risk Management Database: A Model for Managing Risk

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  5. Long-term effects of earthquake experience of young persons on cardiovascular disease risk factors

    Science.gov (United States)

    Li, Na; Wang, Yumei; Yu, Lulu; Song, Mei; Wang, Lan; Ji, Chunpeng

    2016-01-01

    Introduction The aim of the study was to study the long-term effect on cardiovascular disease risk factors of stress from direct experience of an earthquake as a young person. Material and methods We selected workers born between July 1, 1958 and July 1, 1976 who were examined at Kailuan General Hospital between May and October of 2013. Data on cardiovascular events were taken during the workers’ annual health examination conducted between 2006 and 2007. All subjects were divided into three groups according to their experience of the Tangshan earthquake of July 28, 1976, as follows: control group; exposed group 1 and exposed group 2. We compared cardiovascular disease risk factors between the three groups as well as by gender and age. Results One thousand one hundred and ninety-six workers were included in the final statistical analysis. Among all subjects, resting heart rate (p = 0.003), total cholesterol (p earthquake compared with unexposed controls, but were unrelated to loss of relatives. No significant difference in triglyceride levels was observed between the three groups (p = 0.900). Further refinement showed that the effects were restricted to males 40 years of age or older at the time of analysis, but were due primarily to age at the time of earthquake exposure (p = 0.002, p Earthquake experience in the early years of life has long-term effects on adult resting heart rate, total cholesterol, and fasting plasma glucose, especially among men. PMID:28144258

  6. The Effect of Risk Reduction Intervention on Earthquake Disaster Preparedness of the Elderly People

    Directory of Open Access Journals (Sweden)

    Kian Nourozi

    2016-01-01

    Full Text Available Background: Because of vulnerability of the elders in disasters, preparedness of this group is very important in reducing the damages caused by the earthquake. Therefore, the present study designed and conducted with the purpose of developing interventions to increase earthquake preparedness and risk reduction in the elderly people living in Hadishahr Jolfa City, Iran. Materials and Methods: This study was a quasi-experimental study with pretest, posttest design and a control group. Fifty community dwelling elderly people were selected through simple random sampling method from 2 health centers and randomly allocated to intervention and control groups. Intervention program consisted of educational sessions with slideshows, group discussions, and sending reminder materials to their addresses a week later. The data were collected using the researcher developed preparedness questionnaire consisting of 58 items with 4 subscales (communication, environmental, during and after earthquake period. Inferential analyses of data, including analysis of covariance was done by SPSS version 16. Results: The findings showed that scores in all subscales of earthquake preparedness (communication, environment, during and after earthquake significantly increased after educational intervention (P<0.05. Conclusion: Preparedness programs for disaster risk reduction has a positive effect on the elders’ preparedness. Thus, similar multimodal preparedness programs should be used more frequently for this vulnerable community citizens.

  7. Psychological consequences and associated risk factors among adult survivors of the 2008 Wenchuan earthquake.

    Science.gov (United States)

    Wu, Zhibin; Xu, Jiuping; He, Lili

    2014-04-29

    In 2008, a devastating earthquake measuring 8.0 on the Richter scale struck Wenchuan, China. Following this disaster, several studies were conducted which assessed the degree of mental disorders in the affected population, but very few considered that several disorders may occur at the same time. This paper aims to investigate the psychological effects and risk factors among adult survivors one-year after the earthquake event. 2080 adult earthquake survivors from 19 counties in the affected areas were interviewed. A stratified sampling strategy was used to collect the information. Earthquake survivors completed self-report questionnaires, which included a post-traumatic stress disorder (PTSD) checklist, a self-rating depression scale and a self-rating anxiety scale. Fifty nine percent of the participants were male. The prevalence of probable PTSD in the sample was 40.1% (based on the DSM-IV criteria). Significant differences in the demographic variables were found in the levels of anxiety, depression, and PTSD. Anxiety levels were found to be positively correlated with depression (r = 0.438, p epicenter of the earthquake event and the severity of the psychological problems. PTSD, anxiety, and depression were prevalent among the survivors. Most findings on the predictors were found to be consistent with current research. Positive adjustment and social support were found to be needed for the highest-risk population.

  8. Social and ethical issues in environmental risk management.

    Science.gov (United States)

    Oughton, Deborah H

    2011-07-01

    The recognition of the social and ethical aspects of radiation risk management has been an important part of international projects following the Chernobyl accident of 1986. This study comments on the science and policy issues in environmental risk assessment, including the social and ethical dimensions of emergency preparedness and remediation experiences gained from the Chernobyl accident. While the unique situation of Fukushima, combined with an earthquake and tsunami, raises its own social and political challenges, it is hoped that some of the lessons learnt from Chernobyl will be relevant to long-term management of the Fukushima site. Copyright © 2011 SETAC.

  9. Corporate risk management : an overview

    NARCIS (Netherlands)

    Oosterhof, Casper M.

    2001-01-01

    Corporate risk management and hedging are important activities within financial as well as non-financial corporations. Under the assumptions of Modigliani and Miller [1958], corporate risk management is a redundant activity. However, the existence of market imperfections can explain the corporate

  10. TRManager – Technical Risk Manager

    Directory of Open Access Journals (Sweden)

    Mark A. Gregory

    2009-06-01

    Full Text Available This paper presents research into the development of a new information management technique called Technical Risk Manager. Project management involves the use of processes and information management techniques to aid decision making in the pursuit of project success. Project success may be achieved by meeting time, cost or performance criteria. Current project management practices focus on achieving time and cost project success criteria by using three information management techniques developed in the 1950s: Gantt, PERT and Critical Path Method. Technical Risk Manager has been developed to provide an information management technique that may be used to aid project management decision making in the pursuit of achieving the performance project success criteria.

  11. Business risk management

    International Nuclear Information System (INIS)

    Cosby, C.

    2015-01-01

    Bruce Power's definition: an emerging and demonstrable event or change in business plan assumptions that could impact Bruce Power's achievement of its business plan objectives and results. Risks can be either negative (threats) or positive (opportunities). Risks against the 5 year business plan Net Risk = impact * probability.

  12. Smart Grid Risk Management

    Science.gov (United States)

    Abad Lopez, Carlos Adrian

    Current electricity infrastructure is being stressed from several directions -- high demand, unreliable supply, extreme weather conditions, accidents, among others. Infrastructure planners have, traditionally, focused on only the cost of the system; today, resilience and sustainability are increasingly becoming more important. In this dissertation, we develop computational tools for efficiently managing electricity resources to help create a more reliable and sustainable electrical grid. The tools we present in this work will help electric utilities coordinate demand to allow the smooth and large scale integration of renewable sources of energy into traditional grids, as well as provide infrastructure planners and operators in developing countries a framework for making informed planning and control decisions in the presence of uncertainty. Demand-side management is considered as the most viable solution for maintaining grid stability as generation from intermittent renewable sources increases. Demand-side management, particularly demand response (DR) programs that attempt to alter the energy consumption of customers either by using price-based incentives or up-front power interruption contracts, is more cost-effective and sustainable in addressing short-term supply-demand imbalances when compared with the alternative that involves increasing fossil fuel-based fast spinning reserves. An essential step in compensating participating customers and benchmarking the effectiveness of DR programs is to be able to independently detect the load reduction from observed meter data. Electric utilities implementing automated DR programs through direct load control switches are also interested in detecting the reduction in demand to efficiently pinpoint non-functioning devices to reduce maintenance costs. We develop sparse optimization methods for detecting a small change in the demand for electricity of a customer in response to a price change or signal from the utility

  13. Integrated supply chain risk management

    Directory of Open Access Journals (Sweden)

    Riaan Bredell

    2007-11-01

    Full Text Available Integrated supply chain risk management (ISCRM has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly applied, this process may optimise management decision-making and assist in the protection and enhancement of shareholder value.

  14. INTERNAL AUDIT AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Elena RUSE

    2014-04-01

    Full Text Available The existence of risk in economic activity can not be denied. In fact, the risk is a concept which exists in every activity, the term of risk being identified with uncertainty, respectively the (unchance to produce an undesirable event. Internal audit and risk management aim at the same goal, namely the control of risks. Internal Audit performs several roles in risk management plan. The objectives of the internal audit function varies from company to company, but in all economic entities internal audit department aims to improve performance management, enterprise performance and thus improve the internal control system. This paper aims to demonstrate, among other things, that any event that may result in failure is unquestionably classified as risk.

  15. Managing Risk in Systems Development.

    Science.gov (United States)

    DePaoli, Marilyn M.; And Others

    Stanford University's use of a risk assessment methodology to improve the management of systems development projects is discussed. After examining the concepts of hazard, peril, and risk as they relate to the system development process, three ways to assess risk are covered: size, structure, and technology. The overall objective for Stanford…

  16. Tsunami disaster risk management capabilities in Greece

    Science.gov (United States)

    Marios Karagiannis, Georgios; Synolakis, Costas

    2015-04-01

    Greece is vulnerable to tsunamis, due to the length of the coastline, its islands and its geographical proximity to the Hellenic Arc, an active subduction zone. Historically, about 10% of all world tsunamis occur in the Mediterranean region. Here we review existing tsunami disaster risk management capabilities in Greece. We analyze capabilities across the disaster management continuum, including prevention, preparedness, response and recovery. Specifically, we focus on issues like legal requirements, stakeholders, hazard mitigation practices, emergency operations plans, public awareness and education, community-based approaches and early-warning systems. Our research is based on a review of existing literature and official documentation, on previous projects, as well as on interviews with civil protection officials in Greece. In terms of tsunami disaster prevention and hazard mitigation, the lack of tsunami inundation maps, except for some areas in Crete, makes it quite difficult to get public support for hazard mitigation practices. Urban and spatial planning tools in Greece allow the planner to take into account hazards and establish buffer zones near hazard areas. However, the application of such ordinances at the local and regional levels is often difficult. Eminent domain is not supported by law and there are no regulatory provisions regarding tax abatement as a disaster prevention tool. Building codes require buildings and other structures to withstand lateral dynamic earthquake loads, but there are no provisions for resistance to impact loading from water born debris Public education about tsunamis has increased during the last half-decade but remains sporadic. In terms of disaster preparedness, Greece does have a National Tsunami Warning Center (NTWC) and is a Member of UNESCO's Tsunami Program for North-eastern Atlantic, the Mediterranean and connected seas (NEAM) region. Several exercises have been organized in the framework of the NEAM Tsunami Warning

  17. Earthquake parametrics based protection for microfinance disaster management in Indonesia

    Science.gov (United States)

    Sedayo, M. H.; Damanik, R.

    2017-07-01

    Financial institutions included microfinance institutions those lend money to people also face the risk when catastrophe event hit their operation area. Liquidity risk when withdrawal amount and Non Performance Loan (NPL) hiking fast in the same time could hit their cash flow. There are products in market that provide backup fund for this kind of situation. Microfinance institution needs a guideline too make contingency plan in their disaster management program. We develop a probabilistic seismic hazard, index and zonation map as a tool to help in making financial disaster impact reduction program for microfinance in Indonesia. GMPE was used to estimate PGA for each Kabupaten points. PGA to MMI conversion was done by applied empirical relationship. We used loan distribution data from Financial Service Authority and Bank Indonesia as exposure in indexing. Index level from this study could be use as rank of urgency. Probabilistic hazard map was used to pricing two backup scenarios and to make a zonation. We proposed three zones with annual average cost 0.0684‰, 0.4236‰ and 1.4064 for first scenario and 0.3588‰, 2.6112‰, and 6.0816‰ for second scenario.

  18. Enterprise risk management and disclosure

    Directory of Open Access Journals (Sweden)

    Nicoleta Farcane

    2008-01-01

    Full Text Available Our paper deals with aspects regarding risk and uncertainty. Many risk management methods are today implemented in organizations. This perspective reveals that managers are linked in different forms to the activities they are managing, depending on the conditions and levels of uncertainty they are in. Actually, these multiple levels of uncertainty lead to the conclusion that any situation in an organizational system can be classified in two different models of organizational phenomena: the organizational phenomena that are putting managers and stakeholders in conditions of risk and the organizational phenomena that are putting them in condition of uncertainty. Using content analyze in this paper we survey the disclosure level of risk management information in the annual report of top Romanian listed companies.

  19. Menstrual hygiene management among women and adolescent girls in the aftermath of the earthquake in Nepal.

    Science.gov (United States)

    Budhathoki, Shyam Sundar; Bhattachan, Meika; Castro-Sánchez, Enrique; Sagtani, Reshu Agrawal; Rayamajhi, Rajan Bikram; Rai, Pramila; Sharma, Gaurav

    2018-02-02

    Menstrual hygiene management (MHM) is an essential aspect of hygiene for women and adolescent girls between menarche and menopause. Despite being an important issue concerning women and girls in the menstruating age group MHM is often overlooked in post-disaster responses. Further, there is limited evidence of menstrual hygiene management in humanitarian settings. This study aims to describe the experiences and perceptions of women and adolescent girls on menstrual hygiene management in post-earthquake Nepal. A mixed methods study was carried out among the earthquake affected women and adolescent girls in three villages of Sindhupalchowk district of Nepal. Data was collected using a semi-structured questionnaire that captured experiences and perceptions of respondents on menstrual hygiene management in the aftermath of the Nepal earthquake. Quantitative data were triangulated with in-depth interview regarding respondent's personal experiences of menstrual hygiene management. Menstrual hygiene was rated as the sixth highest overall need and perceived as an immediate need by 18.8% of the respondents. There were 42.8% women & girls who menstruated within first week of the earthquake. Reusable sanitary cloth were used by about 66.7% of the respondents before the earthquake and remained a popular method (76.1%) post-earthquake. None of the respondents reported receiving menstrual adsorbents as relief materials in the first month following the earthquake. Disposable pads (77.8%) were preferred by respondents as they were perceived to be clean and convenient to use. Most respondents (73.5%) felt that reusable sanitary pads were a sustainable choice. Women who were in the age group of 15-34 years (OR = 3.14; CI = (1.07-9.20), did not go to school (OR = 9.68; CI = 2.16-43.33), married (OR = 2.99; CI = 1.22-7.31) and previously used reusable sanitary cloth (OR = 5.82; CI = 2.33-14.55) were more likely to use the reusable sanitary cloth. In

  20. Induced Earthquakes from Long-Term Gas Extraction in Groningen, the Netherlands: Statistical Analysis and Prognosis for Acceptable-Risk Regulation.

    Science.gov (United States)

    Vlek, Charles

    2018-01-16

    Recently, growing earthquake activity in the northeastern Netherlands has aroused considerable concern among the 600,000 provincial inhabitants. There, at 3 km deep, the rich Groningen gas field extends over 900 km 2 and still contains about 600 of the original 2,800 billion cubic meters (bcm). Particularly after 2001, earthquakes have increased in number, magnitude (M, on the logarithmic Richter scale), and damage to numerous buildings. The man-made nature of extraction-induced earthquakes challenges static notions of risk, complicates formal risk assessment, and questions familiar conceptions of acceptable risk. Here, a 26-year set of 294 earthquakes with M ≥ 1.5 is statistically analyzed in relation to increasing cumulative gas extraction since 1963. Extrapolations from a fast-rising trend over 2001-2013 indicate that-under "business as usual"-around 2021 some 35 earthquakes with M ≥ 1.5 might occur annually, including four with M ≥ 2.5 (ten-fold stronger), and one with M ≥ 3.5 every 2.5 years. Given this uneasy prospect, annual gas extraction has been reduced from 54 bcm in 2013 to 24 bcm in 2017. This has significantly reduced earthquake activity, so far. However, when extraction is stabilized at 24 bcm per year for 2017-2021 (or 21.6 bcm, as judicially established in Nov. 2017), the annual number of earthquakes would gradually increase again, with an expected all-time maximum M ≈ 4.5. Further safety management may best follow distinct stages of seismic risk generation, with moderation of gas extraction and massive (but late and slow) building reinforcement as outstanding strategies. Officially, "acceptable risk" is mainly approached by quantification of risk (e.g., of fatal building collapse) for testing against national safety standards, but actual (local) risk estimation remains problematic. Additionally important are societal cost-benefit analysis, equity considerations, and precautionary restraint. Socially and psychologically, deliberate

  1. RISKS IN INVESTMENT AND MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ms. Tatiana A. Ykovleva

    2016-12-01

    Full Text Available The article discusses the features of investment risks and their causes, as well as provides a detailed classification of investment risks. The authors reveal the essence and content of the investment process, risk management, providing material for presentation in the form of a diagram. In conclusion, the article explains the use of the system of specialized institutions as a way to exclude the basic, or primary investment risk.

  2. RISK MANAGEMENT IN BUSINESS

    OpenAIRE

    Corina Ducu; Mihaela Mãrãcine

    2011-01-01

    The business environment is more competitive than ever and it is characterized by risk, uncertainty, speed and volatility. The concept of risk in business is inextricably linked to the concept of profitability and flexibility. The result of the company (profit or loss) is influenced by unexpected events that accompany its activity.

  3. METHODOLOGICAL ISSUES OF BANKING OPERATIONAL RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    David I. Philippov

    2015-01-01

    Full Text Available The article highlights the issues of operational risk management methodology in commercial bank. The main sources of operational risks, risk indicators, operational risk assessment techniques.

  4. Risk Management Issues - An Aerospace Perspective

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  5. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  6. The Theme of Risk Management

    Directory of Open Access Journals (Sweden)

    Chua, D. K. H.

    2014-07-01

    Full Text Available The papers in this issue of the Journal come from different industry sectors, yet there can be a common theme that ties them together. Two of the papers address explicitly the issue of risk management, while the other three may be related to it in different degrees. One of the critical factors for project success is risk identification, as determined by Chua et al. (1999. The importance of risk management cannot be overemphasized. Failure to identify crucial risk elements in a project can lead to significant project failures in terms of cost and schedule.

  7. Understanding Risk Management

    National Research Council Canada - National Science Library

    2005-01-01

    The U.S. Air Force's Software Technology Support Center offers an updated and condensed version of the "Guidelines for Successful Acquisition and Management of Software-Intensive Systems" (GSAM) on its Web site...

  8. Managing Multiple Risk Factors

    National Research Council Canada - National Science Library

    Lollis, Charlie

    1998-01-01

    ...) contribute to the racial differences in cardiovascular risk and events among women. High levels of socioeconomic stress, higher dietary fat intake and sedentary lifestyle are more prevalent among black than white women...

  9. Definition of a short-cut methodology for assessing earthquake-related Na-Tech risk.

    Science.gov (United States)

    Busini, Valentina; Marzo, Enrico; Callioni, Andrea; Rota, Renato

    2011-08-15

    Na-Tech (Natural and Technological) refers to industrial accidents triggered by natural events such as storms, earthquakes, flooding, and lightning. Herein, a qualitative methodology for the initial assessment of earthquake Na-Tech risk has been developed as a screening tool to identify which situations require a much more expensive Quantitative Risk Analysis (QRA). The proposed methodology, through suitable Key Hazard Indicators (KHIs), identifies the Na-Tech risk level associated with a given situation (i.e., a process plant located in a given territory), using the Analytical Hierarchy Process as a multi-criteria decision tool for the evaluation of such KHIs. The developed methodology was validated by comparing its computational results with QRA results that involved Na-Tech events previously presented in literature. Copyright © 2011 Elsevier B.V. All rights reserved.

  10. How to manage risk better

    CSIR Research Space (South Africa)

    Walwyn, DR

    2002-09-01

    Full Text Available Risk management practices in the R&D departments of many chemical and pharmaceutical companies lack much of the rigor and sophistication of the equivalent corporation in the financial sector. For instance investment decisions on research projects...

  11. The earthquake disaster risk characteristic and the problem in the earthquake emergency rescue of mountainous southwestern Sichuan

    Science.gov (United States)

    Yuan, S.; Xin, C.; Ying, Z.

    2016-12-01

    In recent years, earthquake disaster occurred frequently in Chinese mainland, the secondary disaster which have been caused by it is more serious in mountainous region. Because of the influence of terrain and geological conditions, the difficulty of earthquake emergency rescue work greatly increased, rescue force is also urged. Yet, it has been studied less on earthquake emergency rescue in mountainous region, the research in existing equipment whether can meet the actual needs of local earthquake emergency rescue is poorly. This paper intends to discuss and solve these problems. Through the mountainous regions Ganzi and Liangshan states in Sichuan field research, we investigated the process of earthquake emergency response and the projects for rescue force after an earthquake, and we also collected and collated local rescue force based data. By consulting experts and statistical analyzing the basic data, there are mainly two problems: The first is about local rescue force, they are poorly equipped and lack in the knowledge of medical help or identify architectural structure. There are no countries to establish a sound financial investment protection mechanism. Also, rescue equipment's updates and maintenance; The second problem is in earthquake emergency rescue progress. In the complicated geologic structure of mountainous regions, traffic and communication may be interrupted by landslides and mud-rock flows after earthquake. The outside rescue force may not arrive in time, rescue equipment was transported by manpower. Because of unknown earthquake disaster information, the local rescue force was deployed unreasonable. From the above, the local government worker should analyze the characteristics of the earthquake disaster in mountainous regions, and research how to improve their earthquake emergency rescue ability. We think they can do that by strengthening and regulating the rescue force structure, enhancing the skills and knowledge, training rescue workers

  12. Martin Marietta Paducah Gaseous Diffusion Plant comprehensive earthquake emergency management program

    International Nuclear Information System (INIS)

    1990-01-01

    Recognizing the value of a proactive, integrated approach to earthquake preparedness planning, Martin Marietta Energy Systems, Inc. initiated a contract in June 1989 with Murray State University, Murray, Kentucky, to develop a comprehensive earthquake management program for their Gaseous Diffusion Plant in Paducah, Kentucky (PGDP -- Subcontract No. 19P-JV649V). The overall purpose of the program is to mitigate the loss of life and property in the event of a major destructive earthquake. The program includes four distinct (yet integrated) components: (1) an emergency management plan with emphasis on the catas trophic earthquake; (2) an Emergency Operations Center Duty Roster Manual; (3) an Integrated Automated Emergency Management Information System (IAEMIS); and (4) a series of five training program modules. The PLAN itself is comprised of four separate volumes: Volume I -- Chapters 1--3; Volume II -- Chapters 4--6; Volume III -- Chapter 7; and Volume IV -- 23 Appendices. The EOC Manual (which includes 15 mutual aid agreements) is designated as Chapter 7 in the PLAN and is this document numbered as Volume III

  13. Martin Marietta Paducah Gaseous Diffusion Plant comprehensive earthquake emergency management program

    International Nuclear Information System (INIS)

    1990-01-01

    Recognizing the value of a proactive, integrated approach to earthquake preparedness planning, Martin Marietta Energy Systems, Inc. initiated a contract in June 1989 with Murray State University, Murray, Kentucky, to develop a comprehensive earthquake management program for their Gaseous Diffusion Plant in Paducah, Kentucky (PGDP -- Subcontract No. 19P-JV649V). The overall purpose of the program is to mitigate the loss of life and property in the event of a major destructive earthquake. The program includes four distinct (yet integrated) components: an emergency management plan, with emphasis on the catastrophic earthquake; an Emergency Operations Center Duty Roster Manual; an Integrated Automated Emergency Management Information System (IAEMIS); and a series of five training program modules. The PLAN itself is comprised of four separate volumes: Volume I -- Chapters 1--3; Volume II -- Chapters 4--6, Volume III -- Chapter 7, and Volume IV -- 23 Appendices. The EOC Manual (which includes 15 mutual aid agreements) is designated as Chapter 7 in the PLAN and is a ''stand alone'' document numbered as Volume III. This document, Volume II, discusses methodology, engineering and environmental analyses, and operational procedures

  14. Martin Marietta Paducah Gaseous Diffusion Plant comprehensive earthquake emergency management program

    International Nuclear Information System (INIS)

    1990-01-01

    Recognizing the value of a proactive, integrated approach to earthquake preparedness planning, Martin Marietta Energy Systems, Inc. initiated a contract in June 1989 with Murray State University, Murray, Kentucky, to develop a comprehensive earthquake management program for their Gaseous Diffusion Plant in Paducah, Kentucky. The overall purpose of the program is to mitigate the loss of life and property in the event of a major destructive earthquake. The program includes four distinct (yet integrated) components: an emergency management plan, with emphasis on the catastrophic earthquake; an Emergency Operations Center Duty Roster Manual; an Integrated Automated Emergency Management Information System (IAEMIS); and a series of five training program modules. The PLAN itself is comprised of four separate volumes: Volume I -- Chapters 1--3; Volume II -- Chapters 4--6, Volume III -- Chapter 7, and Volume IV -- 23 Appendices. The EOC Manual (which includes 15 mutual aid agreements) is designated as Chapter 7 in the PLAN and is a ''stand alone'' document numbered as Volume III. This document, Volume I, provides an introduction, summary and recommendations, and the emergency operations center direction and control

  15. Martin Marietta Paducah Gaseous Diffusion Plant comprehensive earthquake emergency management program

    International Nuclear Information System (INIS)

    1990-01-01

    Recognizing the value of a proactive, integrated approach to earthquake preparedness planning, Martin Marietta Energy Systems, Inc, initiated a contract in June 1989 with Murray State University, Murray, Kentucky, to develop a comprehensive earthquake management program for their Gaseous Diffusion Plant in Paducah, Kentucky (PGDP--Subcontract No. 19P-JV649V). The overall purpose of the program is to mitigate the loss of life and property in the event of a major destructive earthquake. The program includes four distinct (yet integrated) components: (1) an emergency management plan, with emphasis on the catas trophic earthquake, (2) an Emergency Operations Center Duty Roster Manual, (3) an Integrated Automated Emergency Management Information System (IAEMIS), and (4) a series of five training program modules. The PLAN itself is comprised of four separate volumes: Volume I--Chapters 1--3; Volume II--Chapters 4--6, Volume III--Chapter 7, and Volume IV--23 Appendices. The EOC Manual (which includes 15 mutual aid agreements) is designated as Chapter 7 in the PLAN and is a ''stand alone'' document numbered as Volume III. This document, Volume IV contains the appendices to this report

  16. Comparative risk assessments for Guadeloupe: earthquakes and storm surge

    OpenAIRE

    Réveillère , Arnaud; Monfort , Daniel; Lecacheux , Sophie; Grisanti , Ludovic; Muller , Héloise; Bertil , Didier; Rohmer , Jérémy; Sedan , Olivier; Douglas , John; Baills , Audrey; Modaressi , Hormoz

    2012-01-01

    In France, risk assessments for natural hazards are usually carried out separately and decision makers lack comprehensive information. Moreover, since the cause of the hazard (e.g. meteorological, geological) and the physical phenomenon that causes damage (e.g. inundation, ground shaking) may be fundamentally different, the quantitative comparison of single risk assessments that were not conducted in a compatible framework is not straightforward. Comprehensive comparative risk assessments exi...

  17. Disaster Management System as an Element of Risk Management for Natural Disaster Systems Using the PESTLE Framework

    OpenAIRE

    Sarwar, D; Ramachandran, M; Hosseinian Far, A

    2017-01-01

    Recently, we have witnessed so many natural catastrophes such as earthquakes in Japan, severe floods in the UK, US and many other parts of the world. Consequently businesses have been losing tens of billions of dollars as a result of various natural and man-made disasters. Disaster Management System (DMS) have proven to be important means for reducing risks associated with such damages to businesses. A DMS can minimize and in some cases, eliminates the risks through technical, management or o...

  18. Geoethical suggestions for reducing risk of next (not only strong) earthquakes

    Science.gov (United States)

    Nemec, Vaclav

    2013-04-01

    Three relatively recent examples of earthquakes can be used as a background for suggesting geoethical views into any prediction accompanied by a risk analysis. ĹAquila earthquake (Italy - 2009): ĹAquila was largely destroyed by earthquakes in 1315, 1319, 1452, 1461, 1501, 1646, 1703 (until that time altogether about 3000 victims) and 1786 (about 6000 victims of this event only). The city was rebuilt and remained stable until October 2008, when tremors began again. From January 1 through April 5, 2009, additional 304 tremors were reported. When after measuring increased levels of radon emitted from the ground a local citizen (for many years working for the Italian National Institute of Astrophysics) predicted a major earthquake on Italian television, he was accused of being alarmist. Italy's National Commission for Prediction and Prevention of Major Risks met in L'Aquila for one hour on March 31, 2009, without really evaluating and characterising the risks that were present. On April 6 a 6.3 magnitude earthquake struck Aquila and nearby towns, killing 309 people and injuring more than 1,500. The quake also destroyed roughly 20,000 buildings, temporarily displacing another 65,000 people. In July 2010, prosecutor Fabio Picuti charged the Commission members with manslaughter and negligence for failing to warn the public of the impending risk. Many international organizations joined the chorus of criticism wrongly interpreting the accusation and sentence at the first stage as a problem of impossibility to predict earthquakes. - The Eyjafjallajokull volcano eruption (Iceland - 2010) is a reminder that in our globalized, interconnected world because of the increased sensibility of the new technology even a relatively small natural disaster may cause unexpected range of problems. - Earthquake and tsunami (Japan - 2011) - the most powerful known earthquake ever to have hit Japan on March 11. Whereas the proper earthquake with the magnitude of 9.0 has caused minimum of

  19. Natural Time, Nowcasting and the Physics of Earthquakes: Estimation of Seismic Risk to Global Megacities

    Science.gov (United States)

    Rundle, John B.; Luginbuhl, Molly; Giguere, Alexis; Turcotte, Donald L.

    2017-11-01

    Natural Time ("NT") refers to the concept of using small earthquake counts, for example of M > 3 events, to mark the intervals between large earthquakes, for example M > 6 events. The term was first used by Varotsos et al. (2005) and later by Holliday et al. (2006) in their studies of earthquakes. In this paper, we discuss ideas and applications arising from the use of NT to understand earthquake dynamics, in particular by use of the idea of nowcasting. Nowcasting differs from forecasting, in that the goal of nowcasting is to estimate the current state of the system, rather than the probability of a future event. Rather than focus on an individual earthquake faults, we focus on a defined local geographic region surrounding a particular location. This local region is considered to be embedded in a larger regional setting from which we accumulate the relevant statistics. We apply the nowcasting idea to the practical development of methods to estimate the current state of risk for dozens of the world's seismically exposed megacities, defined as cities having populations of over 1 million persons. We compute a ranking of these cities based on their current nowcast value, and discuss the advantages and limitations of this approach. We note explicitly that the nowcast method is not a model, in that there are no free parameters to be fit to data. Rather, the method is simply a presentation of statistical data, which the user can interpret. Among other results, we find, for example, that the current nowcast ranking of the Los Angeles region is comparable to its ranking just prior to the January 17, 1994 Northridge earthquake.

  20. Natural Time, Nowcasting and the Physics of Earthquakes: Estimation of Seismic Risk to Global Megacities

    Science.gov (United States)

    Rundle, John B.; Luginbuhl, Molly; Giguere, Alexis; Turcotte, Donald L.

    2018-02-01

    Natural Time ("NT") refers to the concept of using small earthquake counts, for example of M > 3 events, to mark the intervals between large earthquakes, for example M > 6 events. The term was first used by Varotsos et al. (2005) and later by Holliday et al. (2006) in their studies of earthquakes. In this paper, we discuss ideas and applications arising from the use of NT to understand earthquake dynamics, in particular by use of the idea of nowcasting. Nowcasting differs from forecasting, in that the goal of nowcasting is to estimate the current state of the system, rather than the probability of a future event. Rather than focus on an individual earthquake faults, we focus on a defined local geographic region surrounding a particular location. This local region is considered to be embedded in a larger regional setting from which we accumulate the relevant statistics. We apply the nowcasting idea to the practical development of methods to estimate the current state of risk for dozens of the world's seismically exposed megacities, defined as cities having populations of over 1 million persons. We compute a ranking of these cities based on their current nowcast value, and discuss the advantages and limitations of this approach. We note explicitly that the nowcast method is not a model, in that there are no free parameters to be fit to data. Rather, the method is simply a presentation of statistical data, which the user can interpret. Among other results, we find, for example, that the current nowcast ranking of the Los Angeles region is comparable to its ranking just prior to the January 17, 1994 Northridge earthquake.

  1. Prevalence and risk factors of post-traumatic stress disorder among adult survivors six months after the Wenchuan earthquake.

    Science.gov (United States)

    Zhou, Xiaobo; Kang, Lin; Sun, Xueli; Song, Hui; Mao, Wenjun; Huang, Xuanyin; Zhang, Yinghui; Li, Jing

    2013-07-01

    Exposure to earthquake has been associated with psychological distress, in particular, the development of posttraumatic stress disorder (PTSD). The aims of this study were to estimate the prevalence of PTSD, explore the associated risk factors among adult survivors 6 months after the Wenchuan earthquake in China, and compare the findings in our study to other studies about the Wenchuan earthquake and other earthquakes that occurred in the past. Multistage stratified random sampling methods were conducted in three severely affected areas in the Wenchuan earthquake. In this study, 14,798 individuals were identified with simple random selection methods at the sampling sites, 14,207 individuals were screened with the 12-item General Health Questionnaire(GHQ-12), and 3692 individuals were administered a Chinese version of the Structured Clinical Interview for Diagnostic and Statistical Manual (DSM)-IV axis I disorders (SCID-I/P) by 180 psychiatrists. The prevalence of PTSD was 15.57%. The risk factors for PTSD included old age, female gender, living alone, buried in the earthquake, injured in the earthquake, operated on after the earthquake, witnessing someone get injured in the earthquake, witnessing someone get buried in the earthquake, witnessing someone die in the earthquake (P<0.05, 95% CI). PTSD is common after a major disaster. Risk factors help people to identify the potential victims after disasters in time. Post-disaster mental health recovery interventions include early identification, sustained psychosocial support, governmental programs that provide social and economic support. Copyright © 2013 Elsevier Inc. All rights reserved.

  2. Legal risk management in shipping

    DEFF Research Database (Denmark)

    Siig, Kristina

    The book discusses the most typical legal challenges met in the chartering, broker, agent or port management part of the shipping industry. It discusses these issues in both English and Scandinavian law and gives indications on how to best ensure your legal risk management in these parts...

  3. Risk Management for Food Allergy

    DEFF Research Database (Denmark)

    Risk Management for Food Allergy is developed by a team of scientists and industry professionals who understand the importance of allergen risk assessment and presents practical, real-world guidance for food manufacturers. With more than 12 million Americans suffering from food allergies and little...

  4. An Integrated and Interdisciplinary Model for Predicting the Risk of Injury and Death in Future Earthquakes.

    Science.gov (United States)

    Shapira, Stav; Novack, Lena; Bar-Dayan, Yaron; Aharonson-Daniel, Limor

    2016-01-01

    A comprehensive technique for earthquake-related casualty estimation remains an unmet challenge. This study aims to integrate risk factors related to characteristics of the exposed population and to the built environment in order to improve communities' preparedness and response capabilities and to mitigate future consequences. An innovative model was formulated based on a widely used loss estimation model (HAZUS) by integrating four human-related risk factors (age, gender, physical disability and socioeconomic status) that were identified through a systematic review and meta-analysis of epidemiological data. The common effect measures of these factors were calculated and entered to the existing model's algorithm using logistic regression equations. Sensitivity analysis was performed by conducting a casualty estimation simulation in a high-vulnerability risk area in Israel. the integrated model outcomes indicated an increase in the total number of casualties compared with the prediction of the traditional model; with regard to specific injury levels an increase was demonstrated in the number of expected fatalities and in the severely and moderately injured, and a decrease was noted in the lightly injured. Urban areas with higher populations at risk rates were found more vulnerable in this regard. The proposed model offers a novel approach that allows quantification of the combined impact of human-related and structural factors on the results of earthquake casualty modelling. Investing efforts in reducing human vulnerability and increasing resilience prior to an occurrence of an earthquake could lead to a possible decrease in the expected number of casualties.

  5. Managing Supplier Sustainability Risk

    OpenAIRE

    Harilainen, Hanna-Riitta

    2014-01-01

    Supply chains are increasingly global, often reaching to developing regions. The media pressure brand owners to be responsible, but a product is only as sustainable as the practices of all the companies involved in manufacturing it are. It’s not enough that the brand owner acts responsibly; sustainable practices have to reach component and raw material suppliers upstream. Image risk has often been recognized as reason for investing in sustainability. In the supply chain context, supplier m...

  6. Prevalence and risk factors of complicated grief among Sichuan earthquake survivors.

    Science.gov (United States)

    Li, Jie; Chow, Amy Y M; Shi, Zhanbiao; Chan, Cecilia L W

    2015-04-01

    Disasters usually involves massive casualties, yet few post-disaster studies explore the prevalence of complicated grief (CG) among survivors. Complicated grief is a distinct psychological disorder, and is associated with impaired physical and psychological functions. Given such gap in the literature and the significance of this topic, this study is hoped to offer more information of complicated grief among survivors who lost their loved ones in disaster. Adopting a large scale survey, the prevalence and risk factors of CG among bereaved survivors one year after the Sichuan earthquake in China were explored. In total 803 bereaved survivors participated the study by filling a questionnaire on measuring CG symptoms, posttraumatic stress disorder (PTSD) symptoms, intrapersonal factors, earthquake related factors, bereavement related factors, and an interpersonal factor. There were 71.1% of the participants scored higher than the cutoff point of CG symptoms. Close relationship with the deceased, PTSD symptoms, losing means of livelihood, physical injury, and terrifying experience in the earthquake, were identified to be risk factors for CG. The study was cross-sectional and the data was collected through a self-reported questionnaire. The sample was recruited from one of the most severely affected counties, thus the generalizability of the results should be interpreted with caution. A large portion of bereaved earthquake survivors suffered from CG symptoms one year after the disaster. Risk factors found in this study can be used to identify high risk groups, who need special care, support, and bereavement interventions. Copyright © 2015 Elsevier B.V. All rights reserved.

  7. Subsea pipeline operational risk management

    Energy Technology Data Exchange (ETDEWEB)

    Bell, R.L.; Lanan, G.A.

    1996-12-31

    Resources used for inspection, maintenance, and repair of a subsea pipeline must be allocated efficiently in order to operate it in the most cost effective manner. Operational risk management aids in resource allocation through the use of risk assessments and cost/benefit analyses. It identifies those areas where attention must be focused in order to reduce risk. When they are identified, a company`s resources (i.e., personnel, equipment, money, and time) can then be used for inspection, maintenance, and/or repair of the pipeline. The results are cost effective risk reduction and pipeline operation with minimum expenditure.

  8. Risk Management and Value Creation

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Roggi, Oliviero

    Corporate failures, periodic recessions, regional debt crises and volatile financial markets have intensified the focus on risk management as the means to deal with turbulent conditions. The ability to respond effectively to abrupt environmental impacts is considered an important source of compet......Corporate failures, periodic recessions, regional debt crises and volatile financial markets have intensified the focus on risk management as the means to deal with turbulent conditions. The ability to respond effectively to abrupt environmental impacts is considered an important source...... of competitive advantage. Yet, surprisingly little research has analyzed whether the presumed advantages of effective risk management are associated with superior outcomes. Here we present a comprehensive study of risk management effectiveness and the relationship to corporate performance based on more than 33......,500 observations in 3,400 firms over the turbulent 20-year period 1991-2010. Determining effective risk management as the ability to reduce earnings and cash flow volatility, we find that both have significant positive relationships to lagged performance measures after controlling for industry effects, company...

  9. Depression and its risk factors among pregnant women in 2008 Sichuan earthquake area and non-earthquake struck area in China.

    Science.gov (United States)

    Dong, Xuehan; Qu, Zhiyong; Liu, Fangnan; Jiang, Xiaoing; Wang, Yang; Chui, Cheryl Hiu Kwan; Wang, Xiaohua; Tian, Donghua; Zhang, Xiulan

    2013-11-01

    On May 12, 2008, a powerful 8.0 magnitude earthquake struck China's Sichuan province. While some studies have assessed the mental and physical wellbeing of disaster victims, few have examined the long-term impact of natural disasters on pregnant women's mental health. As such, this study aims to assess whether the Sichuan earthquake continues to negatively affect women's mental health, 4 years since its occurrence. In addition, predictive and protective risk factors of depressive symptoms among pregnant women were also identified. From June 2012 to October 2012, 520 pregnant women were interviewed, of whom 253 were from an earthquake struck area and 267 were from a non-earthquake struck area. Symptoms of antenatal depression were measured using the Edinburgh Postnatal Depression Scale (EPDS) with a cutoff of≥10. The prevalence rate of depression among pregnant women in the earthquake area was 34.5% (95% CI, 28.9-40.6), while the rate in the non-earthquake area was 39.6% (95% CI, 33.9-45.5). The perceived stresses associated with pregnancy and social support from husbands are significantly correlated with antenatal depression. Lack of diagnosis for antenatal depression and it is a self-report evaluation. This study found that the Sichuan earthquake does not necessarily have a long-lasting effect on pregnant women who were once victims of the disaster. It was found that pregnant women who experience high levels of pressures from the pregnancy and receive medium support from husbands are more susceptible to experience antenatal depression than pregnant women who perceive higher levels of support from husbands. © 2013 Elsevier B.V. All rights reserved.

  10. Risk Management in the Exchange Fund Account

    OpenAIRE

    Michel Rochette

    2002-01-01

    In this article, author Michel Rochette of the Bank's Risk-Management Unit briefly describes the initiatives undertaken to identify, analyze, model, and manage the principal risks inherent in the transactions of the Exchange Fund Account (EFA), where the international reserves of the federal government are held. The author focuses on five types of risk: credit risk, market risk, liquidity risk, operational risk, and legal risk. In addition, the author presents the risk-management principles u...

  11. Risk Perception and Economic Value Of Disaster Mitigation Case of Bantul Post Earthquake May 2006

    Directory of Open Access Journals (Sweden)

    Suryanto Suryanto

    2012-11-01

    Full Text Available Normal 0 false false false IN X-NONE AR-SA MicrosoftInternetExplorer4 This study aims to obtain empirical evidence of disaster mitigation in Bantul, Indonesia. The expected utility theory and impact of regional characteristics on individual perceptions was used to describe the disaster risk management process. The regional mapping based on hazard level was conducted by a Geographical Information System (GIS. Data used in this research were primary and secondary data. Primary data were obtained by distributing questionnaire to some respondents. Sample amounts used were 395 respondents. The research empirical contribution was to economic valuation method used towards safety and efforts to link regional characteristics, individual perception and also their willingness to conduct mitigation. The research practical contribution was to identify some key obstacles in disaster risk management. Based on multiple regression analysis, this study found that educational level, risk aversion degree, trust towards earthquake-resistant building, control ability, income level, classifi cation of hazard area contributes to higher Willingness To Pay (WTP for mitigation. It also found that perception towards central governmental roles variable did not affect to WTP for mitigation. However, the income levels of the communities in Bantul positively correspond to WTP for mitigation suggesting that the fi ndings were consistent with the expected utility theory. /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso

  12. Managing nuclear supplier risks

    International Nuclear Information System (INIS)

    Ramberg, B.

    1990-01-01

    This paper reports that with the appearance of such third-tier suppliers as Argentina, Brazil, South Korea, Taiwan, China, and others capable of producing nuclear components and sensitive nuclear materials, assurance that importers are using nuclear energy benignly and safely may become more uncertain. It is therefore important to integrate emerging exporters and importers into a regime of norms designed to minimize nuclear risks. The experience of the London Nuclear Suppliers Group (NSG) to arrive at a code of conduct is encouraging. Placed in the context of the larger evolving nuclear energy regime that seeks to address nuclear safety, proliferation, terrorism, and military attacks on reactors, the international community has made substantial progress. Still, there is much that remains to be done

  13. Minimization of Basis Risk in Parametric Earthquake Cat Bonds

    Science.gov (United States)

    Franco, G.

    2009-12-01

    A catastrophe -cat- bond is an instrument used by insurance and reinsurance companies, by governments or by groups of nations to cede catastrophic risk to the financial markets, which are capable of supplying cover for highly destructive events, surpassing the typical capacity of traditional reinsurance contracts. Parametric cat bonds, a specific type of cat bonds, use trigger mechanisms or indices that depend on physical event parameters published by respected third parties in order to determine whether a part or the entire bond principal is to be paid for a certain event. First generation cat bonds, or cat-in-a-box bonds, display a trigger mechanism that consists of a set of geographic zones in which certain conditions need to be met by an earthquake’s magnitude and depth in order to trigger payment of the bond principal. Second generation cat bonds use an index formulation that typically consists of a sum of products of a set of weights by a polynomial function of the ground motion variables reported by a geographically distributed seismic network. These instruments are especially appealing to developing countries with incipient insurance industries wishing to cede catastrophic losses to the financial markets because the payment trigger mechanism is transparent and does not involve the parties ceding or accepting the risk, significantly reducing moral hazard. In order to be successful in the market, however, parametric cat bonds have typically been required to specify relatively simple trigger conditions. The consequence of such simplifications is the increase of basis risk. This risk represents the possibility that the trigger mechanism fails to accurately capture the actual losses of a catastrophic event, namely that it does not trigger for a highly destructive event or vice versa, that a payment of the bond principal is caused by an event that produced insignificant losses. The first case disfavors the sponsor who was seeking cover for its losses while the

  14. Keeping focus on earthquakes at school for seismic risk mitigation of the next generations

    Science.gov (United States)

    Saraò, Angela; Barnaba, Carla; Peruzza, Laura

    2013-04-01

    The knowledge of the seismic history of its own territory, the understanding of physical phenomena in response to an earthquake, the changes in the cultural heritage following a strong earthquake, the learning of actions to be taken during and after an earthquake, are piece of information that contribute to keep focus on the seismic hazard and to implement strategies for seismic risk mitigation. The training of new generations, today more than ever subject to rapid forgetting of past events, becomes therefore a key element to increase the perception that earthquakes happened and can happen at anytime and that mitigation actions are the only means to ensure the safety and to reduce damages and human losses. Since several years our institute (OGS) is involved in activities to raise awareness of education on earthquake. We aim to implement education programs with the goal of addressing a critical approach to seismic hazard reduction, differentiating the types of activities according to the age of the students. However, being such kind of activity unfunded, we can act at now only on a very limited number of schools per year. To be effective, the inclusion of the seismic risk issues in school curricula requires specific time and appropriate approaches when planning activities. For this reason, we involve also the teachers as proponents of activities and we encourage them to keep alive memories and discussion on earthquake in the classes. During the past years we acted mainly in the schools of the Friuli Venezia Giulia area (NE Italy), that is an earthquake prone area struck in 1976 by a destructive seismic event (Ms=6.5). We organized short training courses for teachers, we lectured classes, and we led laboratory activities with students. Indeed, being well known that students enjoy classes more when visual and active learning are joined, we propose a program that is composed by seminars, demonstrations and hands-on activities in the classrooms; for high school students

  15. Earthquake risk reduction in the United States: An assessment of selected user needs and recommendations for the National Earthquake Hazards Reduction Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This Assessment was conducted to improve the National Earthquake Hazards Reduction Program (NEHRP) by providing NEHRP agencies with information that supports their user-oriented setting of crosscutting priorities in the NEHRP strategic planning process. The primary objective of this Assessment was to take a ``snapshot`` evaluation of the needs of selected users throughout the major program elements of NEHRP. Secondary objectives were to conduct an assessment of the knowledge that exists (or is being developed by NEHRP) to support earthquake risk reduction, and to begin a process of evaluating how NEHRP is meeting user needs. An identification of NEHRP`s strengths also resulted from the effort, since those strengths demonstrate successful methods that may be useful to NEHRP in the future. These strengths are identified in the text, and many of them represent important achievements since the Earthquake Hazards Reduction Act was passed in 1977.

  16. Earthquake Hazard Mitigation Strategy in Indonesia

    Science.gov (United States)

    Karnawati, D.; Anderson, R.; Pramumijoyo, S.

    2008-05-01

    Because of the active tectonic setting of the region, the risks of geological hazards inevitably increase in Indonesian Archipelagoes and other ASIAN countries. Encouraging community living in the vulnerable area to adapt with the nature of geology will be the most appropriate strategy for earthquake risk reduction. Updating the Earthquake Hazard Maps, enhancement ofthe existing landuse management , establishment of public education strategy and method, strengthening linkages among stake holders of disaster mitigation institutions as well as establishement of continues public consultation are the main strategic programs for community resilience in earthquake vulnerable areas. This paper highlights some important achievements of Earthquake Hazard Mitigation Programs in Indonesia, together with the difficulties in implementing such programs. Case examples of Yogyakarta and Bengkulu Earthquake Mitigation efforts will also be discussed as the lesson learned. The new approach for developing earthquake hazard map which is innitiating by mapping the psychological aspect of the people living in vulnerable area will be addressed as well.

  17. Obstetrics Hospitalists: Risk Management Implications.

    Science.gov (United States)

    Veltman, Larry

    2015-09-01

    The concept of having an in-house obstetrician (serving as an obstetrics [OB] hospitalist) available 24 hours a day, 7 days a week provides a safety net for OB events that many need immediate intervention for a successful outcome. A key precept of risk management, that of loss prevention, fits perfectly with the addition of an OB hospitalist role in the perinatal department. Inherent in the role of OB hospitalists are the patient safety and risk management principles of improved communication, enhanced readiness, and immediate availability. Copyright © 2015 Elsevier Inc. All rights reserved.

  18. Risk Management Concepts and Guidance

    Science.gov (United States)

    1989-03-01

    Baillie, Allan S., "Management of Risk and Uncertainty," Research Management, Vol. 23, No. 2, March 1980, pp. 20-24. 34. Banash, Robert C., and...Monterey), 1974. 106. Edgar , J.D., LTC USAF, "Controlling Murphy: How to Budget for Program Risk, Concepts," - The Journal of Defense Systems...Secretary of Defense (OSD), 5-57 Point Cost Estimate ( POE ), 5-39 thru 5-43 OPERA, 5-33 Polaris Submarine Program, 5-29 Operating Cost, 5-35, 5-59, 6

  19. 12 CFR 917.3 - Risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  20. Earthquake and volcano hazard notices: An economic evaluation of changes in risk perceptions

    Science.gov (United States)

    Bernknopf, R.L.; Brookshire, D.S.; Thayer, M.A.

    1990-01-01

    Earthquake and volcano hazard notices were issued for the Mammoth Lakes, California area by the U.S. Geological Survey under the authority granted by the Disaster Relief Act of 1974. The effects on investment, recretion visitation, and risk perceptionsare explored. The hazard notices did not affect recreation visitation, although investment was affected. A perceived loss in the market value of homes was documented. Risk perceptions were altered for property owners. Communication of the probability of an event over time would enhance hazard notices as a policy instrument and would mitigate unnecessary market perturbations. ?? 1990.

  1. EFFECTIVE RISK MANAGEMENT IN MODERN INDUSTRIAL ...

    African Journals Online (AJOL)

    for effective risk management, repudiating a unilateral decision by the .... Classical Risk Management in Industrial Organizations .... Culture theory in risk management perceives risk as socially structured and influenced by people's everyday interaction with family, friends and peers so that a person's response to risk ...

  2. Applications of research from the U.S. Geological Survey program, assessment of regional earthquake hazards and risk along the Wasatch Front, Utah

    Science.gov (United States)

    Gori, Paula L.

    1993-01-01

    INTERACTIVE WORKSHOPS: ESSENTIAL ELEMENTS OF THE EARTHQUAKE HAZARDS RESEARCH AND REDUCTION PROGRAM IN THE WASATCH FRONT, UTAH: Interactive workshops provided the forum and stimulus necessary to foster collaboration among the participants in the multidisciplinary, 5-yr program of earthquake hazards reduction in the Wasatch Front, Utah. The workshop process validated well-documented social science theories on the importance of interpersonal interaction, including interaction between researchers and users of research to increase the probability that research will be relevant to the user's needs and, therefore, more readily used. REDUCING EARTHQUAKE HAZARDS IN UTAH: THE CRUCIAL CONNECTION BETWEEN RESEARCHERS AND PRACTITIONERS: Complex scientific and engineering studies must be translated for and transferred to nontechnical personnel for use in reducing earthquake hazards in Utah. The three elements needed for effective translation, likelihood of occurrence, location, and severity of potential hazards, and the three elements needed for effective transfer, delivery, assistance, and encouragement, are described and illustrated for Utah. The importance of evaluating and revising earthquake hazard reduction programs and their components is emphasized. More than 30 evaluations of various natural hazard reduction programs and techniques are introduced. This report was prepared for research managers, funding sources, and evaluators of the Utah earthquake hazard reduction program who are concerned about effectiveness. An overview of the Utah program is provided for those researchers, engineers, planners, and decisionmakers, both public and private, who are committed to reducing human casualties, property damage, and interruptions of socioeconomic systems. PUBLIC PERCEPTIONS OF THE IMPLEMENTATION OF EARTHQUAKE MITIGATION POLICIES ALONG THE WASATCH FRONT IN UTAH: The earthquake hazard potential along the Wasatch Front in Utah has been well defined by a number of scientific and

  3. From Seismic Scenarios to Earthquake Risk Assessment: A Case Study for Iquique, Chile.

    Science.gov (United States)

    Aguirre, P.; Fortuno, C.; Martin, J. C. D. L. L.; Vasquez, J.

    2015-12-01

    Iquique is a strategic city and economic center in northern Chile, and is located in a large seismic gap where a megathrust earthquake and tsunami is expected. Although it was hit by a Mw 8.2 earthquake on April 1st 2014, which caused moderate damage, geophysical evidence still suggests that there is potential for a larger event, so a thorough risk assessment is key to understand the physical, social, and economic effects of such potential event, and devise appropriate mitigation plans. Hence, Iquique has been selected as a prime study case for the implementation of a risk assessment platform in Chile. Our study integrates research on three main elements of risk calculations: hazard evaluation, exposure model, and physical vulnerabilities. To characterize the hazard field, a set of synthetic seismic scenarios have been developed based on plate interlocking and the residual slip potential that results from subtracting the slip occurred during the April 1st 2014 rupture fault mechanism, obtained using InSAR+GPS inversion. Additional scenarios were developed based of the fault rupture model of the Maule 2010 Mw 8.8 earthquake and on the local plate locking models in northern Chile. These rupture models define a collection of possible realizations of earthquake geometries parameterized in terms of critical variables like slip magnitude, rise time, mean propagation velocity, directivity, and other, which are propagated to obtain a hazard map for Iquique (e.g. PGA, PGV, PDG). Furthermore, a large body of public and local data was used to construct a detailed exposure model for Iquique, including aggregated building count, demographics, essential facilities, and lifelines. This model together with the PGA maps for the April 1st 2014 earthquake are used to calibrate HAZUS outputs against observed damage, and adjust the fragility curves of physical systems according to more detailed analyses of typical Chilean building types and their structural properties, plus historical

  4. A view on risk management

    International Nuclear Information System (INIS)

    Joksimovich, V.

    1991-01-01

    The world at large has enjoyed the benefits of industrial technology for almost two centuries. The managers of industrial facilities as well as members of the public focused on the benefits and typically ignored or underestimated the inherent risks entailed in deployment of these technologies. Two examples will be given for the sake of illustration. In the chemical industry, the impacts of various chemicals on humans are insufficiently understood. In addition, it was not even known that some hazardous chemicals could be formed in the chemical reactions taking place in various chemical reactors. This is equivalent to not knowing that Cesium-iodide compound can be formed within nuclear fuel nor the impact it might have on humans if released, which is inconceivable in the nuclear industry. In the era of risk recognition, many industrial managers proclaimed that safety is everybody's business. The basic premise behind this was that since everyone is responsible, no one can be blamed for accidents. This is, however, shifting because both economics and litigation are now compelling industrial managers to consider risk in conjunction with the benefit. The government managers in many cases interpreted their charter to reap benefits first and pay the price of risks later; e.g., the case of nuclear weapons production facilities seriously contaminated by radioactive and other hazardous materials. Cost of clean-up was estimated at more than $100 billion. Of course, the authors have similar examples in many other industries, e.g., Superfund project of chemical waste sites. The challenge for the technologists is to maximize the benefit/risk ratio, keeping the risks, real or perceived, acceptably small. This brings us to the issue of acceptable risks, the topic of this paper

  5. [Risk Assessment and Risk Management of Chemicals in China].

    Science.gov (United States)

    Wang, Tie-yu; Zhou, Yun-qiao; Li, Qi-feng; Lü, Yong-long

    2016-02-15

    Risk assessment and risk management have been increasingly approved as an effective approach for appropriate disposal and scientific management of chemicals. This study systematically analyzed the risk assessment methods of chemicals from three aspects including health risk, ecological risk and regional risk. Based on the current situation of classification and management towards chemicals in China, a specific framework of risk management on chemicals was proposed by selecting target chemicals, predominant industries and related stakeholders as the objects. The results of the present study will provide scientific support for improving risk assessment and reasonable management of chemicals in China.

  6. A risk-mitigation approach to the management of induced seismicity.

    Science.gov (United States)

    Bommer, Julian J; Crowley, Helen; Pinho, Rui

    2015-01-01

    Earthquakes may be induced by a wide range of anthropogenic activities such as mining, fluid injection and extraction, and hydraulic fracturing. In recent years, the increased occurrence of induced seismicity and the impact of some of these earthquakes on the built environment have heightened both public concern and regulatory scrutiny, motivating the need for a framework for the management of induced seismicity. Efforts to develop systems to enable control of seismicity have not yet resulted in solutions that can be applied with confidence in most cases. The more rational approach proposed herein is based on applying the same risk quantification and mitigation measures that are applied to the hazard from natural seismicity. This framework allows informed decision-making regarding the conduct of anthropogenic activities that may cause earthquakes. The consequent risk, if related to non-structural damage (when re-location is not an option), can be addressed by appropriate financial compensation. If the risk poses a threat to life and limb, then it may be reduced through the application of strengthening measures in the built environment-the cost of which can be balanced against the economic benefits of the activity in question-rather than attempting to ensure that some threshold on earthquake magnitude or ground-shaking amplitude is not exceeded. However, because of the specific characteristics of induced earthquakes-which may occur in regions with little or no natural seismicity-the procedures used in standard earthquake engineering need adaptation and modification for application to induced seismicity.

  7. Risk management at GPU Nuclear

    International Nuclear Information System (INIS)

    Long, R.L.

    1991-01-01

    This paper reports on GPU Nuclear. Among other goals, it established the independence of key safety functions as highlighted by the lessons learned from the accident. In particular, an independent Nuclear Assurance Division was established which include Quality Assurance, Training and Education, Emergency Preparedness, and Nuclear Safety Assessment. The latter consisted of corporate and site independent-safety-review groups. As the GPU Nuclear organization matured, a mid-1987 reorganization created an even more focused Planning and Nuclear Safety Division bringing together Nuclear Safety Assessment with Licensing and Regulatory Affairs and Risk Management. The Risk Management Group (RMG), which began its work in fall 1987, was formed to develop a framework for proactive identification, evaluation, and cost-effective reduction and management of risks of all types. The RMG set out to learn as much as possible about risks and their management in nuclear and other high-technology industries. This began with a thorough literature search. It progressed to interviews with individuals and organizations which have demonstrated innovative ideas, experience, and reputations for safe and reliable operation

  8. CEA: assessment of risk management 2011

    International Nuclear Information System (INIS)

    2012-06-01

    This report proposes an overview of CEA activities in the field of risk management in different areas: impact on the environment, installation safety, management of occupational risks (occupational health and safety), radiological protection of workers, transportation of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of law risks, controls and audits. It finally presents the risk management department

  9. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  10. Reducing the risk, managing safety.

    Science.gov (United States)

    Aldridge, Peter

    2016-02-01

    Fire safety in healthcare premises has always been a challenge to those that discharge this duty. Statutory compliance should be a matter of course, but in an ever increasingly challenged NHS, even this is not a given. While the NHS is driven by managing very complex risk to deliver cutting edge healthcare, providers cannot be risk averse. Which risk, however, takes priority? Here Peter Aldridge, fire and corporate services manager at Leeds Teaching Hospitals NHS Trust, and Secretary to the National Association of Healthcare Fire Officers (NAHFO)--which will this month and next jointly stage fire safety seminars with IHEEM; see page 8--considers the key issues, with input from a fire officer at a leading mental health and community Trust.

  11. Earthquake and volcanic risks: issues for the Bataan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Solidum, Dr. Renato U.

    2009-01-01

    The proposed re-commissioning of the mothballed Bataan Nuclear Power Plant (BNPP) has raised objections that include the perceived unsafe siting of the BNPP on Mt. Natib, a potentially active volcano, in an earthquake-prone region. This concern must be evaluated through thorough seismological, paleo-seismic, volcanological and engineering studies. The BNPP sits on Napot Point on the southwest foot slope of Mt. Natib, an andesitic to dacitic stratovolcano just 30 kms south of Mt. Pinatubo. Natib's evolution is poorly known, but involved at least 3 explosive summit eruptions that formed a 6 km-diameter coalescent caldera and a younger 2-km diameter caldera. Pyroclastic flows define the cone surface, and available age dating includes a ±27 ka 14C age for a deposit on the eastern flanks and an 11-18 ka relative dating for suspected pyroclastic deposits in Subic Bay (1). Whether these represent the most recent eruptions is uncertain. A detailed magmatic/eruptive history defining magmatic recharge and eruption recurrence rates, from which probabilities for future eruptive activity can be analyzed, will be necessary for quantifying volcanic risk. Furthermore, Natib,Pinatubo and adjacent Mariveles are part of the Luzon Arc and associated with ongoing subduction along the Manila Trench. Subduction earthquakes are common, but apart from these, seismic risk is also being attributted to tectonic structures inland that include reported on site faults inferred from drilling, basin faults seen in reflection profiles (1), the Subic Bay Fault Zone delineated by magmatic studies (2) and various lineaments inferred from satellite imageries. These, plus seismicity in the region are being argued as indicators of earthquake threat. However, much emphasis is given maximum seismic magnitudes rather than peak ground accelerations (PGAs), epicentral rather than focal sources,and the inference of faults/lineaments rather than paleoseismic evidence of recent faulting. Paleoseismic studies of

  12. Advances in coastal disasters risk management : Lessons from the 2011 Tohoku tsunami

    NARCIS (Netherlands)

    Jonkman, S.N.; Yasuda, T.; Tsimopoulou, V.; Kawai, H.; Kato, F.

    2012-01-01

    The earthquake and tsunami of March 2011 led to death and destruction in coastal areas in Japan. A seminar was held in June 2012 for Japanese and Dutch coastal researchers to discuss lessons for the management of the risks in coastal areas associated with tsunamis, typhoons and storm surges. The

  13. Overview of the Hanford risk management plan

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  14. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  15. An Integrated and Interdisciplinary Model for Predicting the Risk of Injury and Death in Future Earthquakes.

    Directory of Open Access Journals (Sweden)

    Stav Shapira

    Full Text Available A comprehensive technique for earthquake-related casualty estimation remains an unmet challenge. This study aims to integrate risk factors related to characteristics of the exposed population and to the built environment in order to improve communities' preparedness and response capabilities and to mitigate future consequences.An innovative model was formulated based on a widely used loss estimation model (HAZUS by integrating four human-related risk factors (age, gender, physical disability and socioeconomic status that were identified through a systematic review and meta-analysis of epidemiological data. The common effect measures of these factors were calculated and entered to the existing model's algorithm using logistic regression equations. Sensitivity analysis was performed by conducting a casualty estimation simulation in a high-vulnerability risk area in Israel.the integrated model outcomes indicated an increase in the total number of casualties compared with the prediction of the traditional model; with regard to specific injury levels an increase was demonstrated in the number of expected fatalities and in the severely and moderately injured, and a decrease was noted in the lightly injured. Urban areas with higher populations at risk rates were found more vulnerable in this regard.The proposed model offers a novel approach that allows quantification of the combined impact of human-related and structural factors on the results of earthquake casualty modelling. Investing efforts in reducing human vulnerability and increasing resilience prior to an occurrence of an earthquake could lead to a possible decrease in the expected number of casualties.

  16. Risk Management for e-Business

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available In the new Internet economy, risk management plays a critical role to protect the organization and its ability to perform their business mission, not just its IT assets. Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. The risk management is an important component of a IT security program. Information and communications technology management and IT security are responsible for ensuring that technology risks are managed appropriately. These risks originate from the deployment and use of IT assets in various ways, such as configuring systems incorrectly or gaining access to restricted software.

  17. Environmental risk evaluation to minimize impacts within the area affected by the Wenchuan earthquake.

    Science.gov (United States)

    Du, Pengfei; Chen, Jining; Chen, Chao; Liu, Yi; Liu, Jianguo; Wang, Hongtao; Zhang, Xiaojian

    2012-03-01

    Earthquakes can be devastating to built infrastructure and the natural environment, as evidenced by the March 2011, M=9.0 earthquake, and subsequent tsunami, in Japan. As seen in the Japanese event, environmental damage caused by secondary disasters (tsunami, leakage from a nuclear reactor) can equal or exceed the impacts of the primary event. In order to develop an environmental assessment system to examine secondary disasters, a comprehensive environmental impact evaluation was conducted after the Wenchuan earthquake that occurred on 12 May 2008 in the Sichuan Province, China. This evaluation focused on several key environmental elements such as wastewater, drinking water, soil, solid waste, radiation, and ecosystem-level effects. As part of this assessment, an analysis of root causes and potential solutions was conducted for key issues such as population relocation and resettlement in temporary dwellings, recovery of environmental protection functions, industrial development strategies and production recovery. Methods for post-quake environmental assessment were developed, utilizing GIS-based techniques for spatial evaluation of primary and secondary disaster patterns. The goal of this exercise was the development of effective assessment methods that can be rapidly applied in a post-disaster situation to reduce and mitigate damage caused by secondary disasters, and facilitate the recovery of impaired environmental management structure and function. Copyright © 2011 Elsevier B.V. All rights reserved.

  18. Tank waste remediation system risk management list

    International Nuclear Information System (INIS)

    Collard, L.B.

    1995-01-01

    The Tank Waste Remedation System (TWRS) Risk Management List and it's subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists

  19. Risk Management Practices by Barbadian Banks

    Directory of Open Access Journals (Sweden)

    Anthony Wood

    2013-07-01

    The main findings of the paper are: risk managers perceive risk management as critical to their banks’ performance; the types of risks causing the greatest exposures are credit risk, operational risk, country/sovereign risk, interest rate risk and market risk; there was a high level of success with current risk management practices and these practices have evolved over time in line with the changing economic environment and regulatory updates. Overall, the findings suggest strongly that in light of the current depressed economic climate, banks operating in Barbados are indeed risk-focused or might we say “risk intelligent”.

  20. Public perception of risks from nuclear power plants in Japan, before the Great East Japan Earthquake

    International Nuclear Information System (INIS)

    Murayama, Rumiko; Nakaune, Naoko; Kishikawa, Hiroki; Uchiyama, Iwao

    2011-01-01

    On this research we aim to clarify public perception of risks from nuclear power plants before the Great East Japan Earthquake. The findings of the questionnaire survey conducted in 2010 showed that 1) about 70% of the people felt that they gained benefit from nuclear power plants and these were needed for their daily life. 2) Fifty percent respondents recognized there was danger to themselves and their family members with regards to nuclear power plants. The risks of nuclear power plants to Japanese society ware estimated higher than that risk to individuals of Japanese public. 3) Perception of risks from nuclear power plants to individual Japanese tended to be slightly lower between 1999 and 2010. (author)

  1. Electricity derivatives and risk management

    Energy Technology Data Exchange (ETDEWEB)

    Deng, S.J. [School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA 30332-0205 (United States); Oren, S.S. [Department of Industrial Engineering and Operations Research, University of California, Berkeley, CA 94720 (United States)

    2006-05-15

    Electricity spot prices in the emerging power markets are volatile, a consequence of the unique physical attributes of electricity production and distribution. Uncontrolled exposure to market price risks can lead to devastating consequences for market participants in the restructured electricity industry. Lessons learned from the financial markets suggest that financial derivatives, when well understood and properly utilized, are beneficial to the sharing and controlling of undesired risks through properly structured hedging strategies. We review different types of electricity financial instruments and the general methodology for utilizing and pricing such instruments. In particular, we highlight the roles of these electricity derivatives in mitigating market risks and structuring hedging strategies for generators, load serving entities, and power marketers in various risk management applications. Finally, we conclude by pointing out the existing challenges in current electricity markets for increasing the breadth, liquidity and use of electricity derivatives for achieving economic efficiency. (author)

  2. Historical Earthquake Records and their Application for Seismic Hazard and Risk Assessment in Tianshui, Gansu Province, Northwestern China

    Science.gov (United States)

    Wang, L.; Wang, Z.

    2009-12-01

    Tianshui, located in southeastern Gansu Province of northwestern China, was a center of early Chinese civilization and the birthplace of “Ba Gua” or “eight symbols.” It has a long history of earthquakes and many strong and large earthquakes have occurred there. Earthquakes, ancient or modern ones, have not only been well recorded, but also left marks on many historical landmarks and buildings that can still be seen today. For example, major damage by the 1654 Tianshui earthquake (M8.0) and some minor damage by the 2008 Wenchuan earthquake can be seen in the Maiji Grotto. A new effort to investigate and reexamine the historical macroseismic records is under way, with the aim of better seismic hazard and risk assessment for the Tianshui area. Seismic hazard and risk will be assessed for the Tianshui area using the 2,500 years of intensity observations (records). The results will be used by local governments and communities for developing more effective mitigation policies in the aftermath of the 2008 Wenchuan earthquake. The results will also be compared to hazard and risk assessments derived from other approaches, such as probabilistic and deterministic seismic hazard analyses.

  3. 42 CFR 441.476 - Risk management.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  4. The complete idiot's guide to risk management

    CERN Document Server

    Cortez, Annetta

    2010-01-01

    Risk. It's what business is all about. The key to success is to anticipating and managing the risks that can impact business. The Complete Idiot's Guide(r) to Risk Management provides the key information necessary to manage business risk successfully.

  5. Caries management by risk assessment.

    Science.gov (United States)

    Young, Douglas A; Featherstone, John D B

    2013-02-01

    Caries disease is multifactorial. Whether caries disease will be expressed and damage dental hard tissue is dependent on the patient's own unique make-up of pathogenic risk factors and protective factors. Objectives This manuscript will review the science of managing caries disease based on assessing caries risk. Methods The caries balance/imbalance model and a practical caries risk assessment procedure for patients aged 6 years through adult will illustrate how treatment options can be based on caries risk. Results Neither the forms nor the clinical protocols are meant to imply there is currently only one correct way this can be achieved, rather are used in this manuscript as examples only. Conclusions It is important to have the forms and protocols simple and easy to understand when implementing caries management by risk assessment into clinical practice. The science of CAMBRA based on the caries balance/imbalance model was reviewed and an example protocol was presented. © 2012 John Wiley & Sons A/S. Published by Blackwell Publishing Ltd.

  6. Risk management in insurance business

    OpenAIRE

    Buškevičiūtė, Eugenija; Leškevičiūtė, Audronė

    2008-01-01

    Šiame darbe nagrinėjami rizikos valdymo modeliai, taikant atvejų studijų tyrimo metodą, įvertintas galimų rizikos reikalavimų (Mokumas II) poveikis Lietuvos draudimo rinkos dalyvių veiklai ir šio tyrimo pagrindu parengtas Mokumas II hipotetinių poveikių modelis. Applying case study research method this paper analyzes risk management models, evaluates the possible effects of risk requirements (Solvency II) on the activity of Lithuanian insurance market participants and based on the research...

  7. Risk Management : History, Definition and Critique

    OpenAIRE

    Georges Dionne

    2013-01-01

    The study of risk management began after World War II. Risk management has long been associated with the use of market insurance to protect individuals and companies from various losses associated with accidents. Other forms of risk management, alternatives to market insurance, surfaced during the 1950s when market insurance was perceived as very costly and incomplete for protection against pure risk. The use of derivatives as risk management instruments arose during the 1970s, and expanded r...

  8. Normative engineering risk management systems

    International Nuclear Information System (INIS)

    Regan, P.J.; Pate-Cornell, M.E.

    1997-01-01

    This paper describes the design of a normative engineering risk management system that performs four activities: diagnosis, dynamic evolution, decision making, and information gathering. The problem domain can be represented as a partially-observable Markov decision process (POMDP). By decomposing the POMDP into a separate model for each of the four activities, the system enables highly asymmetric models to be tailored to a particular situation. Our goal is to construct a normative system that creates an accurate, concise decision model and that provides timely, reliable results. Conserved model components are constructed at design time whereas unique features are customized at run time. For run-time model components, human guidance is used sparingly to refine the decision model. Customized asymmetry is most extreme for information gathering. An application to the management of fire risks on board offshore oil platforms, with particular emphasis on gas leaks, illustrates the concepts

  9. Strategies for psychosocial risk management in manufacturing

    OpenAIRE

    Guadix Martín, José; Carrillo Castrillo, Jesús Antonio; Onieva Giménez, Luis Gerardo; Lucena, David

    2015-01-01

    Psychosocial risk is a concern for employers across Europe. Psychosocial risk management, however, is younger than other risk management fields such as safety, hygiene, and ergonomics. Psychosocial risk control prevents accidents and absenteeism. This study examines strategies for psychosocial risk management in manufacturing organizations. The study employs structural equation modeling to analyze results of the European Survey of Enterprises onNewand Emerging Risks (ESENER), a survey that fi...

  10. Hanford Tanks Initiative risk management guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    This project-specific Risk Management Guide describes the general approach and process being used by the HTI Project to manage risk associated with execution of the HTI mission. It includes the initial identification of risk and the quantification of its likelihood and severity of its consequences. It further addresses the formulation of risk mitigation plans, periodic statusing of the Risk Management List, and risk closure

  11. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions......, the importance of managing IT integration risk, and various risk areas for acquisition IT integration....

  12. Risk management in nuclear power social aspects

    International Nuclear Information System (INIS)

    Sappa, N.N.

    1996-01-01

    Problems connected with safety evaluation and risk management during operation of nuclear power installations are considered. Social aspects of risk assessment of enterprises with increased danger are discussed

  13. Strategic raw materials. Risk management

    International Nuclear Information System (INIS)

    Bertau, Martin; Matschullat, Joerg; Kausch, Peter

    2014-01-01

    This volume is divided into four chapters: (1) Raw material management, (2) Primary raw materials, (3) Secondary raw materials and recycling, (4). Processing and products. The topics for the chapter ''Raw material management'' are: Substitution of raw materials - framework conditions and implementation; Thales: Strategic raw materials; Time for cooperation between the EU and China in raw materials policy; Availability of elements for the semiconductor industry; Market price risks of raw material-intensive companies - identification and management. The topics on the second item ''Primary raw materials'' are: The supply of economic-critical raw materials - A search and analysis for causes; Lithium extraction from primary raw materials - state and perspectives; The global market of rare earths - A balancing act; Rare earth deposits in Namibia; New technologies in exploration and discovery - Focus on activities in Europe. The third chapter, ''Secondary Raw Materials and Recycling'', covered the topics: Technology metals - Systemic Requirements along the recycling chain; Integrated re-use of high-tech and greentech wastes; From the sewage sludge ash to the phosphorus fertilizer RecoPhos P38 in the stress field of waste, fertilizer and soil protection. In chapter 4. ''Processing and products'' are the topics: Treatment and processing of rare earth metals; Processing of mineral resources - opportunities and challenges; Consequences of modern germanium chemistry; Strategic resources - Risk management. A review and outlook with a pinch of fantasy.. [de

  14. Resource-Constrained Information Management: Providing Governments with Information for Earthquake Preparedness.

    Science.gov (United States)

    Vatenmacher, Michael; Isaac, Shabtai; Svoray, Tal

    2017-05-01

    This study seeks to attain a better understanding of the information that is required by governments to prepare for earthquakes, and of the constraints they face in obtaining this information. The contributions of the study are two-fold. A survey that was conducted among those responsible for earthquake preparedness actions in different governmental agencies and at different levels revealed on the one hand a desire for information on a broad range of topics, but on the other hand that no resources were allocated in practice to gather this information. A Geographic Information System-based process that was developed following the survey, allowed the required information on seismic hazards and loss and damage risks to be rapidly collected, mapped and integrated. This supported the identification of high-priority areas, for which a more detailed analysis could be initiated. An implementation of the process showed promise, and confirmed its feasibility. Its relative simplicity may ensure that an earthquake preparedness process is initiated by governments that are otherwise reluctant to allocate resources for this purpose.

  15. Strategic crisis and risk communication during a prolonged natural hazard event: lessons learned from the Canterbury earthquake sequence

    Science.gov (United States)

    Wein, A. M.; Potter, S.; Becker, J.; Doyle, E. E.; Jones, J. L.

    2015-12-01

    While communication products are developed for monitoring and forecasting hazard events, less thought may have been given to crisis and risk communication plans. During larger (and rarer) events responsible science agencies may find themselves facing new and intensified demands for information and unprepared for effectively resourcing communications. In a study of the communication of aftershock information during the 2010-12 Canterbury Earthquake Sequence (New Zealand), issues are identified and implications for communication strategy noted. Communication issues during the responses included reliability and timeliness of communication channels for immediate and short decision time frames; access to scientists by those who needed information; unfamiliar emergency management frameworks; information needs of multiple audiences, audience readiness to use the information; and how best to convey empathy during traumatic events and refer to other information sources about what to do and how to cope. Other science communication challenges included meeting an increased demand for earthquake education, getting attention on aftershock forecasts; responding to rumor management; supporting uptake of information by critical infrastructure and government and for the application of scientific information in complex societal decisions; dealing with repetitive information requests; addressing diverse needs of multiple audiences for scientific information; and coordinating communications within and outside the science domain. For a science agency, a communication strategy would consider training scientists in communication, establishing relationships with university scientists and other disaster communication roles, coordinating messages, prioritizing audiences, deliberating forecasts with community leaders, identifying user needs and familiarizing them with the products ahead of time, and practicing the delivery and use of information via scenario planning and exercises.

  16. Legal analysis of citizen lawsuit toward management of the 2006 Yogyakarta earthquake

    Science.gov (United States)

    Suprihadi, Bambang

    2017-07-01

    The Asian Disaster Reduction Center informed that on 27 May 2006 at 5:54 AM Local time or 26 May 2006 at 10:54:00 PM UTC, an M6.3 earthquake has struck the very highly populated region of Yogyakarta. The death estimated between 5,775 and 6,234 and the number of injured was between 46,000 and 53,000. Invitation letters were sent to Indonesia Agency for Meteorology Climatology and Geophysics (BMKG) and to 18 government institutions for attending the session at the Yogyakarta Court on 4 December 2006. Such case was a lawsuit proposed by 46 citizens and registered as number 73/PDT.G/ 2006/PN-Yk and the researcher attended court-session on behalf of the BMKG. Research is conducted to provide legal analysis of citizen lawsuit toward management of the 2006 Yogyakarta earthquake. Data was collected by examining the process of court sessions and mediation between Parties involved which then analysed using the relevant articles of Indonesian Civil Procedural Law. Legal analysis proposed by the researcher indicates that State Court (Pengadilan Negeri) held an `absolute competence' because such case shall not be settled by State Administrative Court (Pengadilan Tata Usaha Negara), however Yogyakarta District Court didn't hold a `relative competence' because such case shall be settled by the Central Jakarta District Court. Such case was not continued due to successful mediation between the two Parties. The 2006 Yogyakarta earthquake alerts BMKG as the earthquake information provider to work properly in accordance with the standard operating procedure to avoid citizen lawsuit that might be proposed in the near future.

  17. Operational Risk Management and Military Aviation Safety

    National Research Council Canada - National Science Library

    Ashley, Park

    1999-01-01

    .... The Army's Class A aviation mishap rate declined after it implemented risk management (RM) principles in 1987. This reduction caught the attention of Air Force leadership who have since stated that the application of operational risk management...

  18. Value at Risk models for Energy Risk Management

    OpenAIRE

    Novák, Martin

    2010-01-01

    The main focus of this thesis lies on description of Risk Management in context of Energy Trading. The paper will predominantly discuss Value at Risk and its modifications as a main overall indicator of Energy Risk.

  19. EFEHR - the European Facilities for Earthquake Hazard and Risk: beyond the web-platform

    Science.gov (United States)

    Danciu, Laurentiu; Wiemer, Stefan; Haslinger, Florian; Kastli, Philipp; Giardini, Domenico

    2017-04-01

    European Facilities for Earthquake Hazard and Risk (EEFEHR) represents the sustainable community resource for seismic hazard and risk in Europe. The EFEHR web platform is the main gateway to access data, models and tools as well as provide expertise relevant for assessment of seismic hazard and risk. The main services (databases and web-platform) are hosted at ETH Zurich and operated by the Swiss Seismological Service (Schweizerischer Erdbebendienst SED). EFEHR web-portal (www.efehr.org) collects and displays (i) harmonized datasets necessary for hazard and risk modeling, e.g. seismic catalogues, fault compilations, site amplifications, vulnerabilities, inventories; (ii) extensive seismic hazard products, namely hazard curves, uniform hazard spectra and maps for national and regional assessments. (ii) standardized configuration files for re-computing the regional seismic hazard models; (iv) relevant documentation of harmonized datasets, models and web-services. Today, EFEHR distributes full output of the 2013 European Seismic Hazard Model, ESHM13, as developed within the SHARE project (http://www.share-eu.org/); the latest results of the 2014 Earthquake Model of the Middle East (EMME14), derived within the EMME Project (www.emme-gem.org); the 2001 Global Seismic Hazard Assessment Project (GSHAP) results and the 2015 updates of the Swiss Seismic Hazard. New datasets related to either seismic hazard or risk will be incorporated as they become available. We present the currents status of the EFEHR platform, with focus on the challenges, summaries of the up-to-date datasets, user experience and feedback, as well as the roadmap to future technological innovation beyond the web-platform development. We also show the new services foreseen to fully integrate with the seismological core services of European Plate Observing System (EPOS).

  20. Aligning records management and risk management with busi- ness ...

    African Journals Online (AJOL)

    Ngulup

    sations have neglected good record-keeping practices thus exposing themselves to risks from various quarters. .... long been viewed as an exercise in risk management as well as a vehicle for controlling costs. According to the ..... dents in support of records management as a tool for risk management were that it is impor-.

  1. Study of International Standards of Risk Management

    Directory of Open Access Journals (Sweden)

    Dykan Volodymyr L.

    2014-01-01

    Full Text Available The goal of the article lies in the study of existing international standards of risk management, an important factor of improvement of risk management in domestic corporations and enterprises and development of recommendations on application of international standards in Ukraine, in particular, within the framework of building corporate systems of risk management. The conducted study shows that approaches on organisation of the process of risk management, used in standards of risk management, are of general character and differ with the degree of detailing. Their undoubted value in development of risk management in Ukraine is identification of a general direction of building corporate systems of risk management in practice. The said approaches at the national and corporate levels of standardisation in Ukraine within the framework of building corporate systems of risk management would allow improvement of risk management in corporations and enterprises. The prospect of further studies of domestic specialists in the field of risk management is development of the domestic standard of risk management with consideration of modern domestic specific features of development of risk management in Ukraine and leading foreign experience.

  2. 12 CFR 932.1 - Risk management.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  3. Assessment of risks of loose landslide deposits formed by the 2008 Wenchuan earthquake

    Science.gov (United States)

    Zhang, S.; Zhang, L. M.; Peng, M.; Zhang, L. L.; Zhao, H. F.; Chen, H. X.

    2012-05-01

    A Geographic Information System (GIS)-based quantitative risk assessment methodology was adopted to evaluate the risks of loose deposits formed by the 2008 Wenchuan earthquake along a highway near the epicenter. A total of 305 loose deposits with a total volume of 4.0 × 107 m3 has been identified. A physical model was used to determine the failure probability of these loose deposits under six rainfall scenarios, assuming the loose deposits as infinite slopes. The calculated probability of rain-induced slope failures is verified by the recorded landslides at the same site during a storm in 2010. Seventy-nine out of the 112 rain-induced loose deposit failures are predicted by the reliability analysis, with an accuracy of 71%. The results of reliability analysis and information on the consequence of these rain-induced landslides enable the estimation of the annual societal and individual risks of the loose deposits. Under the rainfall scenarios of 30 mm/12 h and 70 mm/12 h, the estimated annual societal risks reach 8.8 and 7.5, respectively, and the individual risks reach 0.05 and 0.04, respectively, which are very high compared with present risk acceptance criteria. The preliminary assessment provides a benchmark for studying the long-term risks of these loose deposits and engineering decision.

  4. Risk Management for Human Support Technology Development

    Science.gov (United States)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  5. Seismic risk management of non-engineered buildings

    Science.gov (United States)

    Winar, Setya

    Earthquakes have long been feared as one of nature's most terrifying and devastating events. Although seismic codes clearly exist in countries with a high seismic risk to save lives and human suffering, earthquakes still continue to cause tragic events with high death tolls, particularly due to the collapse of widespread non-engineered buildings with non-seismic resistance in developing countries such as Indonesia. The implementation of seismic codes in non-engineered construction is the key to ensuring earthquake safety. In fact, such implementation is not simple, because it comprises all forms of cross disciplinary and cross sectoral linkages at different levels of understanding, commitment, and skill. This fact suggests that a widely agreed framework can help to harmonise the various perspectives. Hence, this research is aimed at developing an integrated framework for guiding and monitoring seismic risk reduction of non-engineered buildings in Indonesia via a risk management method.Primarily, the proposed framework for the study has drawn heavily on wider literature, the three existing frameworks around the world, and on the contribution of various stakeholders who participated in the study. A postal questionnaire survey, selected interviews, and workshop event constituted the primary data collection methods. As a robust framework needed to be achieved, the following two workshop events, which were conducted in Yogyakarta City and Bengkulu City in Indonesia, were carried out for practicality, validity, and moderation or any identifiable improvement requirements. The data collected was analysed with the assistance of SPSS and NVivo software programmes.This research found that the content of the proposed framework comprises 63 pairs of characteristic-indicators complemented by (a) three important factors of effective seismic risk management of non-engineered buildings, (b) three guiding principles for sustainable dissemination to the grass root communities and (c

  6. Social Risk Management on German Labour Market

    Directory of Open Access Journals (Sweden)

    Raluca Mihălcioiu

    2014-05-01

    Full Text Available Terms such as social policy and labor market policies seem not be very current. Instead, we speak more and more about risk management. Social Risk Management is a concept developed by the Word Bank. It is a tool to transfer management techniques from the operating or finance in the social and labor market policy, to support individuals, households and communities to better manage their risk. Due to poor incentive structures, inadequate insurance policies or control often remain under preventive, palliative and solidarity balancing risk management measures. This paper sets out to define the term of social risk management, describing the basic features from different perspectives and the main measures and strategies used in social risk management area. The essay considers the most discussed word of risk management as a moral opportunity to redefine the balance of responsibility and solidarity in the labor market.

  7. Seismic Politics: Risk and Reconstruction after the 1960 Earthquake in Agadir, Morocco.

    Science.gov (United States)

    Williford, Daniel

    2017-01-01

    On 29 February 1960, an earthquake struck the city of Agadir, Morocco, killing between ten and fifteen thousand Moroccans and Europeans and damaging the majority of the city's structures. Drawing on data from seismographs, witness accounts, and direct observations of destruction, international teams of experts working in the aftermath of the disaster rewrote Agadir as a seismically vulnerable space. In the process, they depoliticized destruction and assigned responsibility for the devastation of the city's poorest neighborhoods to "natural" forces and ineffective "traditional" building practices. Once established in the work of geologists, seismologists, and engineers, the notion of seismic risk shaped the material and moral trajectories of reconstruction during the first decade of Morocco's independence from France. As it cut across scientific, engineering, and bureaucratic domains, seismic risk gave rise to projects aimed less at controlling nature than at redistributing vulnerability and authority among experts, administrators, and inhabitants in Agadir.

  8. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  9. Integrated Foreign Exchange Risk Management

    DEFF Research Database (Denmark)

    Aabo, Tom; Høg, Esben; Kuhn, Jochen

    Empirical research has focused on export as a proxy for the exchange rate exposure and the use of foreign exchange derivatives as the instrument to deal with this exposure. This empirical study applies an integrated foreign exchange risk management approach with a particular focus on the role...... of import in medium-sized, manufacturing firms in Denmark (a small, open economy). We find a strong, negative relation between import and foreign exchange derivatives usage on the aggregate level. Our findings are consistent with the notion that firms use import to match the foreign exchange exposure...

  10. Integrated foreign exchange risk management

    DEFF Research Database (Denmark)

    Aabo, Tom; Høg, Esben; Kuhn, Jochen

    2010-01-01

    Empirical research has focused on export as a proxy for exchange rate exposure and the use of foreign exchange derivatives as an instrument to deal with this exposure. This empirical study applies an integrated foreign exchange risk management approach with a particular focus on the role of import...... in medium-sized manufacturing firms in Denmark (a small, open economy). We find a strong, negative relation between import and the use of foreign exchange derivatives on the aggregate level. Our findings are consistent with the notion that firms use import to match the foreign exchange exposure created...

  11. Managing risks: Seveso and Harrisburg

    International Nuclear Information System (INIS)

    Conrads-Herzog, A.; Krebsbach-Gnath, C.

    1980-01-01

    The publications dealing with the technical, organisation-relevant, and social preconditions for risk strategies rely on second-hand information, i.e. the conclusions which are drawn from the production accident in Seveso and the TMI-accident. A comparison results in common facts as well as in fundamental differences. In contrast to the authorities in Italy the authorities in the United States intervened more rapidly; the management of necessary measures was taken over by the authorities and very good information was given. (DG) [de

  12. Flood risk management in Italy

    DEFF Research Database (Denmark)

    Mysiak, J.; Testella, F.; Bonaiuto, M.

    2013-01-01

    and confront the shortcomings encountered during more than 20 yr of organised flood risk management. This brief communication offers joint recommendations towards this end from three projects funded by the 2nd CRUE ERA-NET (http://www.crue-eranet.net/) Funding Initiative: FREEMAN, IMRA and URFlood....... in the law 183/89 of 18 May 1989, increased the reliance on the response and recovery operations of the civil protection. As a result, the importance of the Civil Protection Mechanism and the relative body of norms and regulation developed rapidly in the 1990s. In the aftermath of the Sarno (1998...

  13. Managing risk with renewable resources

    International Nuclear Information System (INIS)

    Brower, M.C.; Bernow, S.; Duckworth, M.; Spinney, P.; Bell, K.

    1997-01-01

    One approach to managing risk is for a utility company to invest in diverse power sources such as wind power plants. Since wind plants consume no fuel, can be built in relatively small increments with short construction lead times, and generate no pollutants, it is often said that they offer significant protection from risks associated with conventional fossil-fuel power plants. With assistance from Convergence Research, Charles River Associates, and the Tellus Institute, the authors tested this hypothesis by conducting an in-depth analysis of the risk implications of a decision to build a 1,600 MW wind power plant instead of a 400 MW gas-fired combined cycle plant. (The two plants were assumed to have equal firm capacity.) The case study utility was Texas Utilities Electric, a very large investor-owned company serving an area with substantial, high-quality wind resources. The uncertain inputs included fuel prices, environmental regulations (specifically, CO 2 and air pollution controls), wind plant output, conventional plant availability, and load growth. Two different market scenarios were examined: traditional regulation and an unregulated wholesale market characterized either by a power pool or fixed-price contracts of varying duration. Conclusions are striking: under traditional regulation, wind energy provides a net present-value risk-reduction benefit of $3.4 to $7.8/MWh

  14. Posttraumatic stress disorder and posttraumatic growth coexistence and the risk factors in Wenchuan earthquake survivors.

    Science.gov (United States)

    Wu, Zhibin; Xu, Jiuping; Sui, Yan

    2016-03-30

    Various studies have assessed the negative and/or positive changes in the aftermath of traumatic events. Yet few of these have addressed the factors associated with the coexistence of both negative and positive changes after a devastating earthquake. The aim of this study is to assess the relationship between the negative and positive changes and elucidate the risk factors of such changes one year after Wenchuan earthquake. A total of 2080 survivors from 19 counties participated in a self-report questionnaire survey which included the posttraumatic stress disorder (PTSD) Check list-Civilian, the posttraumatic growth PTG Inventory (PTGI). The prevalence of PTSD and moderate PTG was found to be 40.1% (95% CI [37.9% 42.3%]) and 51.1% (95% CI [48.9% 53.3%]). The PTSD and moderate PTG coexistence was 19.6% (95% CI [17.8% 21.4%]). PTSD symptom severity was significantly positively associated with the PTG score. Middle aged groups (31-40 and 41-50 years old, OR=2.323, 95% CI [1.059, 5.095] and OR=2.410, 95% CI [1.090, 5.329] respectively), those with lower income levels (OR=8.019, 95% CI [2.421, 26.558]), those living in temporary house (OR=1.946, 95% CI [1.280, 2.956]), and those who had had less social support (OR=1.109, 95% CI [1.076, 1.143]) had a significantly higher possibility for the presence of PTSD and moderate PTG coexistence. The results indicated the widespread positive changes in earthquake survivors. Better income levels and living conditions and higher social support were suggested to promote PTG in those with PTSD. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  15. The role of INGVterremoti blog in information management during the earthquake sequence in central Italy

    Directory of Open Access Journals (Sweden)

    Maurizio Pignone

    2017-01-01

    Full Text Available In this paper, we describe the role the INGVterremoti blog in information management during the first part of the earthquake sequence in central Italy (August 24 to September 30. In the last four years, we have been working on the INGVterremoti blog in order to provide quick updates on the ongoing seismic activity in Italy and in-depth scientific information. These include articles on specific historical earthquakes, seismic hazard, geological interpretations, source models from different type of data, effects at the surface, and so on. We have delivered information in quasi-real-time also about all the recent magnitude M≥4.0 earthquakes in Italy, the strongest events in the Mediterranean and in the world. During the 2016 central Italy, the INGVterremoti blog has continuously released information about seismic sequences with three types of posts: i updates on the ongoing seismic activity; ii reports on the activities carried out by the INGV teams in the field and any other working groups; iii in-depth scientific articles describing some specific analysis and results. All the blog posts have been shared automatically and in real time on the other social media of the INGVterremoti platform, also to counter the bad information and to fight rumors. These include Facebook, Twitter and INGVterremoti App on IOS and Android. As well, both the main INGV home page (http://www.ingv.it and the INGV earthquake portal (http://terremoti.ingv.it have published the contents of the blog on dedicated pages that were fed automatically. The work done day by day on the INGVterremoti blog has been coordinated with the INGV Press Office that has written several press releases based on the contents of the blog. Since August 24, 53 articles were published on the blog they have had more than 1.9 million views and 1 million visitors. The peak in the number of views, which was more than 800,000 in a single day, was registered on August 24, 2016, following the M 6

  16. Seismic intensity and risk of cerebrovascular stroke: 1995 Hanshin-Awaji earthquake.

    Science.gov (United States)

    Sokejima, Shigeru; Nakatani, Yoshimi; Kario, Kazuomi; Kayaba, Kazunori; Minowa, Masumi; Kagamimori, Sadanobu

    2004-01-01

    No epidemiological data exist concerning the influence of an earthquake on the risk of stroke. Whether the incidence of cerebrovascular stroke increased after the 1995 Hanshin-Awaji earthquake (EQ) in Japan and whether seismic intensity affected stroke risk dose-dependently was examined. A retrospective cohort study was conducted among residents, who were living in two towns on the island of Awaji and were participants of the National Health Insurance (NHI) program. The two towns were divided into 11 districts and their respective damage and socioeconomic states were investigated. Reviewing the NHI documents issued before and after the EQ, people who had strokes (9th International Classification of Diseases, codes 430-431 or 433-434.9) were identified. Risk of stroke in relation to the seismic intensities, was assessed with the Cox proportional hazard model. Among subjects aged 40 to 99 years, 45 of 8,758 (0.514%) had a stroke the year before the EQ 72 of 8,893 (0.810%) had a stroke in the first year following the EQ, and 49 of 8,710 (0.566%) had a stroke in the second year following the EQ. In districts where the earthquake's intensity was risk (RR) of stroke was 2.4 (95% confidence interval (CI) = 1.1, 5.0) in the first year following the EQ, after adjusting for age, gender, and income. In that year, compared with MMI of or = 9.5 were 1.6 (CI = 0.9, 2.1) and 2.0 (CI = 1.1, 3.7), respectively (p for trend 0.02). No trend for the RR was observed in the year before the EQ or in the second year following the EQ. The incidence of stroke increased in the first year following the EQ. The increase was associated with seismic intensity in a dose-response manner. Results suggest a potential threshold for RR of > or = 2.0 in areas near 9.5 on the MMI scale.

  17. The Role of Risk and Risk Management in Experiential Education.

    Science.gov (United States)

    Mobley, Michael

    A monograph examines the role of risk and risk management in experiential education, particularly stress/challenge programming. Definitions of risk are presented. The importance of risk and stress in experiential education is emphasized. Implications of subjective versus objective risk assessment in adventure education are discussed, with…

  18. Geographical detector-based risk assessment of the under-five mortality in the 2008 Wenchuan earthquake, China.

    Directory of Open Access Journals (Sweden)

    Yi Hu

    Full Text Available On 12 May, 2008, a devastating earthquake registering 8.0 on the Richter scale occurred in Sichuan Province, China, taking tens of thousands of lives and destroying the homes of millions of people. Many of the deceased were children, particular children less than five years old who were more vulnerable to such a huge disaster than the adult. In order to obtain information specifically relevant to further researches and future preventive measures, potential risk factors associated with earthquake-related child mortality need to be identified. We used four geographical detectors (risk detector, factor detector, ecological detector, and interaction detector based on spatial variation analysis of some potential factors to assess their effects on the under-five mortality. It was found that three factors are responsible for child mortality: earthquake intensity, collapsed house, and slope. The study, despite some limitations, has important implications for both researchers and policy makers.

  19. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  20. Enterprise Content Management Implementation and Risk

    Directory of Open Access Journals (Sweden)

    Jaroslava Klegová

    2015-01-01

    Full Text Available Enterprise Content Management (ECM solutions are commonly used in many areas such as document management, record management, digital asset management, etc. Key features of ECM systems are capturing, indexing, preserving and retrieving of digital information. The state-of-the- art ECM solution can help revolutionize document management and further automated business processes which can lead to better decisions and competitive advantage. Risk management can reduce project failure and that is why controlling risk in ECM implementation projects is considered to be a major contributor to project success. To manage software risk, the first step is to identify a list of ECM projects’ risks. The present paper provides an overview of ECM implementation risks and contains findings from a small survey on experience of ECM implementation and risk in Czech enterprises. Risk of implementation in the public sector is discussed more deeply with case study examples.

  1. Calysto: Risk Management for Commercial Manned Spaceflight

    Science.gov (United States)

    Dillaman, Gary

    2012-01-01

    The Calysto: Risk Management for Commercial Manned Spaceflight study analyzes risk management in large enterprises and how to effectively communicate risks across organizations. The Calysto Risk Management tool developed by NASA's Kennedy Space Center's SharePoint team is used and referenced throughout the study. Calysto is a web-base tool built on Microsoft's SharePoint platform. The risk management process at NASA is examined and incorporated in the study. Using risk management standards from industry and specific organizations at the Kennedy Space Center, three methods of communicating and elevating risk are examined. Each method describes details of the effectiveness and plausibility of using the method in the Calysto Risk Management Tool. At the end of the study suggestions are made for future renditions of Calysto.

  2. Earthquake Hazard Analysis Methods: A Review

    Science.gov (United States)

    Sari, A. M.; Fakhrurrozi, A.

    2018-02-01

    One of natural disasters that have significantly impacted on risks and damage is an earthquake. World countries such as China, Japan, and Indonesia are countries located on the active movement of continental plates with more frequent earthquake occurrence compared to other countries. Several methods of earthquake hazard analysis have been done, for example by analyzing seismic zone and earthquake hazard micro-zonation, by using Neo-Deterministic Seismic Hazard Analysis (N-DSHA) method, and by using Remote Sensing. In its application, it is necessary to review the effectiveness of each technique in advance. Considering the efficiency of time and the accuracy of data, remote sensing is used as a reference to the assess earthquake hazard accurately and quickly as it only takes a limited time required in the right decision-making shortly after the disaster. Exposed areas and possibly vulnerable areas due to earthquake hazards can be easily analyzed using remote sensing. Technological developments in remote sensing such as GeoEye-1 provide added value and excellence in the use of remote sensing as one of the methods in the assessment of earthquake risk and damage. Furthermore, the use of this technique is expected to be considered in designing policies for disaster management in particular and can reduce the risk of natural disasters such as earthquakes in Indonesia.

  3. BEHAVIOURAL INSIGHTS INTO SUPPLY CHAIN RISK MANAGEMENT

    OpenAIRE

    Alexandra-Codruta Popescu (Bîzoi); Cristian-Gabriel Bîzoi

    2015-01-01

    Literature has focused largely on the field of supply chain risk management. Numerous risks occur within supply chain management. Until lately, behavioural risks (implying large amount of losses) have been neglected and considered not relevant. In this paper we provide an analysis of the importance of including behavioural research in logistics and supply chain risk management, what has been written so far and potential future research directions. Until now, literature on logistics and supply...

  4. Commercializing fuel cells: managing risks

    Science.gov (United States)

    Bos, Peter B.

    Commercialization of fuel cells, like any other product, entails both financial and technical risks. Most of the fuel cell literature has focussed upon technical risks, however, the most significant risks during commercialization may well be associated with the financial funding requirements of this process. Successful commercialization requires an integrated management of these risks. Like any developing technology, fuel cells face the typical 'Catch-22' of commercialization: "to enter the market, the production costs must come down, however, to lower these costs, the cumulative production must be greatly increased, i.e. significant market penetration must occur". Unless explicit steps are taken to address this dilemma, fuel cell commercialization will remain slow and require large subsidies for market entry. To successfully address this commercialization dilemma, it is necessary to follow a market-driven commercialization strategy that identifies high-value entry markets while minimizing the financial and technical risks of market entry. The financial and technical risks of fuel cell commercialization are minimized, both for vendors and end-users, with the initial market entry of small-scale systems into high-value stationary applications. Small-scale systems, in the order of 1-40 kW, benefit from economies of production — as opposed to economies to scale — to attain rapid cost reductions from production learning and continuous technological innovation. These capital costs reductions will accelerate their commercialization through market pull as the fuel cell systems become progressively more viable, starting with various high-value stationary and, eventually, for high-volume mobile applications. To facilitate market penetration via market pull, fuel cell systems must meet market-derived economic and technical specifications and be compatible with existing market and fuels infrastructures. Compatibility with the fuels infrastructure is facilitated by a

  5. Use of Ground Motion Simulations of a Historical Earthquake for the Assessment of Past and Future Urban Risks

    Science.gov (United States)

    Kentel, E.; Çelik, A.; karimzadeh Naghshineh, S.; Askan, A.

    2017-12-01

    Erzincan city located in the Eastern part of Turkey at the conjunction of three active faults is one of the most hazardous regions in the world. In addition to several historical events, this city has experienced one of the largest earthquakes during the last century: The 27 December 1939 (Ms=8.0) event. With limited knowledge of the tectonic structure by then, the city center was relocated to the North after the 1939 earthquake by almost 5km, indeed closer to the existing major strike slip fault. This decision coupled with poor construction technologies, led to severe damage during a later event that occurred on 13 March 1992 (Mw=6.6). The 1939 earthquake occurred in the pre-instrumental era in the region with no available local seismograms whereas the 1992 event was only recorded by 3 nearby stations. There are empirical isoseismal maps from both events indicating indirectly the spatial distribution of the damage. In this study, we focus on this region and present a multidisciplinary approach to discuss the different components of uncertainties involved in the assessment and mitigation of seismic risk in urban areas. For this initial attempt, ground motion simulation of the 1939 event is performed to obtain the anticipated ground motions and shaking intensities. Using these quantified results along with the spatial distribution of the observed damage, the relocation decision is assessed and suggestions are provided for future large earthquakes to minimize potential earthquake risks.

  6. Credit Risk Evaluation : Modeling - Analysis - Management

    OpenAIRE

    Wehrspohn, Uwe

    2002-01-01

    An analysis and further development of the building blocks of modern credit risk management: -Definitions of default -Estimation of default probabilities -Exposures -Recovery Rates -Pricing -Concepts of portfolio dependence -Time horizons for risk calculations -Quantification of portfolio risk -Estimation of risk measures -Portfolio analysis and portfolio improvement -Evaluation and comparison of credit risk models -Analytic portfolio loss distributions The thesis contributes to the evaluatio...

  7. Science-Driven Approach to Disaster Risk and Crisis Management

    Science.gov (United States)

    Ismail-Zadeh, A.

    2014-12-01

    Disasters due to natural extreme events continue to grow in number and intensity. Disaster risk and crisis management requires long-term planning, and to undertake that planning, a science-driven approach is needed to understand and assess disaster risks and to help in impact assessment and in recovery processes after a disaster. Science is used in assessments and rapid modeling of the disaster impact, in forecasting triggered hazards and risk (e.g., a tsunami or a landslide after a large earthquake), in contacts with and medical treatment of the affected population, and in some other actions. At the stage of response to disaster, science helps to analyze routinely the disaster happened (e.g., the physical processes led to this extreme event; hidden vulnerabilities; etc.) At the stage of recovery, natural scientists improve the existing regional hazard assessments; engineers try to use new science to produce new materials and technologies to make safer houses and infrastructure. At the stage of disaster risk mitigation new scientific methods and approaches are being developed to study natural extreme events; vulnerability of society is periodically investigated, and the measures for increasing the resilience of society to extremes are developed; existing disaster management regulations are improved. At the stage of preparedness, integrated research on disaster risks should be developed to understand the roots of potential disasters. Enhanced forecasting and early warning systems are to be developed reducing predictive uncertainties, and comprehensive disaster risk assessment is to be undertaken at local, regional, national and global levels. Science education should be improved by introducing trans-disciplinary approach to disaster risks. Science can help society by improving awareness about extreme events, enhancing risk communication with policy makers, media and society, and assisting disaster risk management authorities in organization of local and regional

  8. Risk management frameworks for human health and environmental risks.

    Science.gov (United States)

    Jardine, Cindy; Hrudey, Steve; Shortreed, John; Craig, Lorraine; Krewski, Daniel; Furgal, Chris; McColl, Stephen

    2003-01-01

    A comprehensive analytical review of the risk assessment, risk management, and risk communication approaches currently being undertaken by key national, provincial/state, territorial, and international agencies was conducted. The information acquired for review was used to identify the differences, commonalities, strengths, and weaknesses among the various approaches, and to identify elements that should be included in an effective, current, and comprehensive approach applicable to environmental, human health and occupational health risks. More than 80 agencies, organizations, and advisory councils, encompassing more than 100 risk documents, were examined during the period from February 2000 until November 2002. An overview was made of the most important general frameworks for risk assessment, risk management, and risk communication for human health and ecological risk, and for occupational health risk. In addition, frameworks for specific applications were reviewed and summarized, including those for (1)contaminated sites; (2) northern contaminants; (3) priority substances; (4) standards development; (5) food safety; (6) medical devices; (7) prescription drug use; (8) emergency response; (9) transportation; (10) risk communication. Twelve frameworks were selected for more extensive review on the basis of representation of the areas of human health, ecological, and occupational health risk; relevance to Canadian risk management needs; representation of comprehensive and well-defined approaches; generalizability with their risk areas; representation of "state of the art" in Canada, the United States, and/or internationally; and extent of usage of potential usage within Canada. These 12 frameworks were: 1. Framework for Environmental Health Risk Management (US Presidential/Congressional Commission on Risk Assessment and Risk Management, 1997). 2. Health Risk Determination: The Challenge of Health Protection (Health and Welfare Canada, 1990). 3. Health Canada Decision

  9. Spatio-temporal earthquake risk assessment for the Lisbon Metropolitan Area - A contribution to improving standard methods of population exposure and vulnerability analysis

    Science.gov (United States)

    Freire, Sérgio; Aubrecht, Christoph

    2010-05-01

    The recent 7.0 M earthquake that caused severe damage and destruction in parts of Haiti struck close to 5 PM (local time), at a moment when many people were not in their residences, instead being in their workplaces, schools, or churches. Community vulnerability assessment to seismic hazard relying solely on the location and density of resident-based census population, as is commonly the case, would grossly misrepresent the real situation. In particular in the context of global (climate) change, risk analysis is a research field increasingly gaining in importance whereas risk is usually defined as a function of hazard probability and vulnerability. Assessment and mapping of human vulnerability has however generally been lagging behind hazard analysis efforts. Central to the concept of vulnerability is the issue of human exposure. Analysis of exposure is often spatially tied to administrative units or reference objects such as buildings, spanning scales from the regional level to local studies for small areas. Due to human activities and mobility, the spatial distribution of population is time-dependent, especially in metropolitan areas. Accurately estimating population exposure is a key component of catastrophe loss modeling, one element of effective risk analysis and emergency management. Therefore, accounting for the spatio-temporal dynamics of human vulnerability correlates with recent recommendations to improve vulnerability analyses. Earthquakes are the prototype for a major disaster, being low-probability, rapid-onset, high-consequence events. Lisbon, Portugal, is subject to a high risk of earthquake, which can strike at any day and time, as confirmed by modern history (e.g. December 2009). The recently-approved Special Emergency and Civil Protection Plan (PEERS) is based on a Seismic Intensity map, and only contemplates resident population from the census as proxy for human exposure. In the present work we map and analyze the spatio-temporal distribution of

  10. CEA - Assessment of risk management 2013

    International Nuclear Information System (INIS)

    Bigot, Bernard; Bonnevie, Edwige; Maillot, Bernard

    2014-06-01

    After some introducing texts by CEA managers, this report proposes a rather detailed overview and presentation of CEA activities, objectives and obtained results in different fields: protection and control of the environment, installation safety, health, safety and radiation protection, transports of hazardous materials, waste management, protection of sites, installations and heritage, management of emergency situations, management of legal risks, internal controls and audits, activity of the risk management department, CEA activities from research to industry

  11. [The relevance of clinical risk management].

    Science.gov (United States)

    Gulino, Matteo; Vergallo, Gianluca Montanari; Frati, Paola

    2011-01-01

    Medical activity includes a risk of possible injury or complications for the patients, that should drive the Health Care Institutions to introduce and/ or improve clinical Risk management instruments. Although Italy is still lacking a National project of Clinical Risk Management, a number of efforts have been made by different Italian Regions to introduce instruments of risk management. In addition, most of National Health Care Institutions include actually a Department specifically in charge to manage the clinical risk. Despite the practical difficulties, the results obtained until now suggest that the risk management may represent a useful instrument to contribute to the reduction of errors in clinical conduct. Indeed, the introduction of adequate instruments of prevention and management of clinical risk may help to ameliorate the quality of health care Institution services.

  12. Contradictions Between Risk Management and Sustainable Development

    International Nuclear Information System (INIS)

    Olsen, Odd Einar; Langhelle, Oluf; Engen, Ole A.

    2006-01-01

    The aim of this paper is to discuss how risk management as a methodology and mindset influence on priorities and decisions concerning sustainable development. Management of risks and hazards often rely on partial analysis with a limited time frame. This may lead to a paradoxical situation where risk management and extended use of risk analysis could hamper long term sustainable development. The question is: Does the use of risk and vulnerability analysis (RaV-analysis) hamper or contribute to sustainable development? Because risk management and assessment has a more narrow scope and a limited time perspective based on well established methodologies, the tangible impacts of risk reducing measures in a project is easier to calculate than long-term and intangible impacts on global development. Empirical evidence is still scarce, but our preliminary conclusion is that mainstream risk management and assessments is counterproductive to sustainable development

  13. Contradictions Between Risk Management and Sustainable Development

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, Odd Einar; Langhelle, Oluf; Engen, Ole A. [Univ. of Stavanger (Norway). Dept. of Media, Culture and Social Science

    2006-09-15

    The aim of this paper is to discuss how risk management as a methodology and mindset influence on priorities and decisions concerning sustainable development. Management of risks and hazards often rely on partial analysis with a limited time frame. This may lead to a paradoxical situation where risk management and extended use of risk analysis could hamper long term sustainable development. The question is: Does the use of risk and vulnerability analysis (RaV-analysis) hamper or contribute to sustainable development? Because risk management and assessment has a more narrow scope and a limited time perspective based on well established methodologies, the tangible impacts of risk reducing measures in a project is easier to calculate than long-term and intangible impacts on global development. Empirical evidence is still scarce, but our preliminary conclusion is that mainstream risk management and assessments is counterproductive to sustainable development.

  14. Space weather and risk management

    Directory of Open Access Journals (Sweden)

    H. Lappalainen

    2005-01-01

    Full Text Available The term space weather is used for the solar driven variability in particle and electromagnetic conditions of the near-Earth space that may harm the performance of ground-based and space-borne technology. The European Union (EU and the European Space Agency (ESA have started a common programme called the Global Monitoring for Environment and Security (GMES. Many of the GMES operational services will rely on technology prone to space weather phenomena. For long-term environmental monitoring this is not a problem, but for applications of risk management in emergency situations the impact of space weather should be considered and evaluated. In this paper, we discuss how ESA's previous activity together with European national initiatives in the space weather area can be used to support GMES and how EU could participate in this work in its Framework Programmes and within the European Research Area (ERA.

  15. Risk management and audit | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    We recognize these risks and work to manage them effectively with the support of our knowledgeable staff on the ground. We manage risk: strategically, with a sound governance and accountability structure;; programmatically, with a well defined strategic and program framework and sound management processes; and ...

  16. 76 FR 45724 - Clearing Member Risk Management

    Science.gov (United States)

    2011-08-01

    ... Management AGENCY: Commodity Futures Trading Commission. ACTION: Notice of proposed rulemaking. SUMMARY: The... proposed rules address risk management for cleared trades by futures commission merchants, swap dealers... Commission has proposed extensive regulations addressing open access and risk management at the derivatives...

  17. Risk Management and Financial Derivatives: An Overview

    NARCIS (Netherlands)

    S.M. Hammoudeh (Shawkat); M.J. McAleer (Michael)

    2012-01-01

    textabstractRisk management is crucial for optimal portfolio management. One of the fastest growing areas in empirical finance is the expansion of financial derivatives. The purpose of this special issue on “Risk Management and Financial Derivatives” is to highlight some areas in which novel

  18. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    Science.gov (United States)

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  19. Active Risk Management and Banking Stability

    NARCIS (Netherlands)

    Silva Buston, C.F.

    2013-01-01

    Abstract: This paper analyzes the net impact of two opposing effects of active risk management at banks on their stability: higher risk-taking incentives and better isolation of credit supply from varying economic conditions. We present a model where banks actively manage their portfolio risk by

  20. Manejo de riesgo (Risk Management). ERIC Digest.

    Science.gov (United States)

    Gaustad, Joan

    The ordinary conduct of school business is accompanied today by risks that were rare or unknown a few decades ago. This ERIC Digest in Spanish discusses how risk management, a concept long used by corporate decision makers, can help school boards and administrators conserve their districts' assets. Risk management is a coordinated effort to…

  1. Information risk management a practitioner's guide

    CERN Document Server

    Sutton, David

    2014-01-01

    Information risk management (IRM) is about identifying, assessing and prioritising risks to keep information secure and available. This accessible book provides practical guidance to the principles and development of a strategic approach to an IRM programme. The only textbook for the BCS Practitioner Certificate in Information Risk Management.

  2. Risk management at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Cummings, G.E.; Strait, R.S.

    1993-10-01

    Managing risks at a large national laboratory presents a unique set of challenges. These challenges include the management of a broad diversity of activities, the need to balance research flexibility against management control, and a plethora of requirements flowing from regulatory and oversight bodies. This paper will present the experiences of Lawrence Livermore National Laboratory (LLNL) in risk management and in dealing with these challenges. While general risk management has been practiced successfully by all levels of Laboratory management, this paper will focus on the Laboratory's use of probabilistic safety assessment and prioritization techniques and the integration of these techniques into Laboratory operations

  3. General Presentation of Risk-ue Project : N´ An Advanced Approach To Earthquake-risk Scenarios, With Application To Different European Towns Z.

    Science.gov (United States)

    Bour, M.; Mouroux, P.; Risk-Ue Team

    Decision makers in earthquake-prone cities need concrete figures of the possible im- pact of seismic events. RISK-UE project will propose a general and modular method- ology for creating earthquake-risk scenarios that concentrates on the distinctive fea- tures of European cities, emphasizing on current buildings, historical centres and cul- tural heritage. It includes: - evaluation of distinctive European features, with analysis of the experience gained by existing European studies; - creation of specific urban databases, structured within GIS, from a systematic inventory and typology of the el- ements at risk within a given town; - seismic-hazard assessment at both the regional and local scales; - analysis of the urban system and the relative value of the elements at risk, so as to classify the main issues of concern; - assessment of the vulnerability of the elements at risk, including current buildings, old centres, cultural heritage build- ings, lifelines, essential structures; - earthquake-risk scenarios, including evaluation of direct and indirect losses of plausible earthquakes and assessment of economic impact through crisis evolution with time. With the participation of urban council represen- tatives and decision makers, this methodology is being applied to the following seven cities: Barcelona (Spain), Bitola (FYROM), Bucharest (Romania), Catania (Italy), Nice (France), Sofia (Bulgaria) and Thessaloniki (Greece). A Web site (www.risk- ue.net) is open to scientific institutions, associate cities and the general public for progressive dissemination of the results during the project. A European cities network for seismic-risk reduction will be created during a final Conference planned in Nice in 2003, where the basis for a European standard for earthquake-risk assessment and prevention in urban areas will be discussed.

  4. Identifying risks in the realm of enterprise risk management.

    Science.gov (United States)

    Carroll, Roberta

    2016-01-01

    An enterprise risk management (ERM) discipline is comprehensive and organization-wide. The effectiveness of ERM is governed in part by the strength and breadth of its practices and processes. An essential element in decision making is a thorough process by which organizational risks and value opportunities can be identified. This article will offer identification techniques that go beyond those used in traditional risk management programs and demonstrate how these techniques can be used to identify risks and opportunity in the ERM environment. © 2016 American Society for Healthcare Risk Management of the American Hospital Association.

  5. Strategies for successful software development risk management

    Directory of Open Access Journals (Sweden)

    Marija Boban

    2003-01-01

    Full Text Available Nowadays, software is becoming a major part of enterprise business. Software development is activity connected with advanced technology and high level of knowledge. Risks on software development projects must be successfully mitigated to produce successful software systems. Lack of a defined approach to risk management is one of the common causes for project failures. To improve project chances for success, this work investigates common risk impact areas to perceive a foundation that can be used to define a common approach to software risk management. Based on typical risk impact areas on software development projects, we propose three risk management strategies suitable for a broad area of enterprises and software development projects with different amounts of connected risks. Proposed strategies define activities that should be performed for successful risk management, the one that will enable software development projects to perceive risks as soon as possible and to solve problems connected with risk materialization. We also propose a risk-based approach to software development planning and risk management as attempts to address and retire the highest impact risks as early as possible in the development process. Proposed strategies should improve risk management on software development projects and help create a successful software solution.

  6. Networked Risk Management : How to successfully manage risks in hyperconnected value networks

    NARCIS (Netherlands)

    Joosten, H.J.M.; Smulders, A.C.M.

    2014-01-01

    Networked Risk Management (NRM) is a methodology aimed at managing dynamic risks. The methodology facilitates the mind shift from risk management to success governance. The result is an accountable prioritisation of risks that could lead to being unsuccessful. NRM is applicable in combination with

  7. Risk Management in Mergers and Acquisitions

    Directory of Open Access Journals (Sweden)

    Dmitry O. Verdiev

    2015-01-01

    Full Text Available M&A statistics show that less than a third of newly merged companies has realized their planned synergistic effects and increased shareholder value. According to the author, such disgusting situation is due to improper planning and failure of corporate management to understand the importance of risk management in M&A. Lack of practice in identification, evaluation, mitigation and regular monitoring of risks leads to the situation when many companies merge despite the fact that the merger bears substantial risks. Corporate management fails to include risk mitigation expenses in merger costs. In many cases, risk mitigation expenses may be so substantive that the merger loses its attractiveness. Only few companies implement risk management methodology while planning M&A activity. This methodology may anticipate and minimize the consequences of various risk factors that negatively influence integration process. The article suggests an implementation of risk management best practice. This risk management best practice may act as an effective tool of successful realization of synergistic effects in M&A and may be helpful in increasing shareholder value in post-merger period. Risk management is conducted throughout the stages of merger and includes identification, analysis, assessment, management and monitoring of risks. Implementation of risk management at early stages of merger planning significantly decreases uncertainty in relation to achievement of financial and operational goals of newly merged company. The article provides with typical M&A risk matrix that may be adapted for specific M&A project. Risk matrix includes a register of risks sorted by stages of M&A deal, quality assessment of their probability, influence and impact on merger as well as risk mitigation methods.

  8. Hybrid Risk Management Methodology: A Case Study

    Directory of Open Access Journals (Sweden)

    Jacky Siu-Lun Ting

    2009-10-01

    Full Text Available Risk management is a decision-making process involving considerations of political, social, economic and engineering factors with relevant risk assessments relating to a potential hazard. In the last decade, a number of risk management tools are introduced and employed to manage and minimize the uncertainty and threats realization to the organizations. However, the focus of these methodologies are different; in which companies need to adopt various risk management principles to visualize a full picture of the organizational risk level. Regarding to this, this paper presents a new approach of risk management that integrates Hierarchical Holographic Modeling (HHM, Enterprise Risk Management (ERM and Business Recovery Planning (BCP for identifying and assessing risks as well as managing the consequences of realized residual risks. To illustrate the procedures of the proposed methodology, a logistic company ABC Limited is chosen to serve as a case study Through applying HHM and ERM to investigate and assess the risk, ABC Limited can be better evaluated the potential risks and then took the responsive actions (e.g. BCP to handle the risks and crisis in near future.

  9. Best practice of nurse managers in risk management

    Directory of Open Access Journals (Sweden)

    Veridiana Tavares Costa

    2013-09-01

    Full Text Available OBJECTIVE: to identify the actions, undertaken by nurse managers in a risk management program, considered as best practice. METHOD: a case study undertaken in a private hospital in the south of Brazil. A risk manager and nurse managers working in a risk management program participated in this study. The data was collected between May and September 2011 through analysis of documents, semi-structured interviews and non-participant observation. Based on the triangulation, the data was analyzed through practical measures. RESULTS: educational actions, the critical analysis of the context, and the multiple dimensions of the management were evidenced as best practice. CONCLUSIONS: the broadening of understanding regarding risk management best practice offers further support for nurse managers to achieve excellence in their actions and thus provide safe and quality care.

  10. Managing financial risk with options on futures.

    Science.gov (United States)

    Bond, M T; Marshall, B S

    1995-05-01

    With the rise of managed care and capitation, more providers will be sharing in the financial risk of providing care. To help protect their organizations from the risk of unexpectedly high utilization under such a fixed-payment system, healthcare financial managers soon will be able to use options on futures contracts. These contracts provide wide profit potential but limited loss potential. Before investing in options on futures, however, healthcare financial managers should consider issues such as basis risk and trading costs.

  11. THE ANALYSIS OF RISK MANAGEMENT PROCESS WITHIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    ROMANESCU MARCEL LAURENTIU

    2016-10-01

    Full Text Available This article highlights the risk analysis within management, focusing on how a company could practicaly integrate the risks management in the existing leading process. Subsequently, it is exemplified the way of manage risk effectively, which gives numerous advantages to all firms, including improving their decision-making process. All these lead to the conclusion that the degree of risk specific to companies is very high, but if managers make the best decisions then it can diminish it and all business activitiy and its income are not influenced by factors that could disturb in a negative way .

  12. Pharmaceutical supply for disaster victims who need chronic disease management in aging region based on lessons learned from the Noto Peninsula Earthquake in 2007

    OpenAIRE

    奥村, 順子; 西田, 祥啓; 木村, 和子

    2008-01-01

    The lessons from the Great Hanshin-Awaji Earthquake and Chuuetsu Earthquake showed us how difficult it is to keep chronic disease management for survivors of such large-scale earthquakes, particularly for elderly people. To solve the problem, an ordinance for enforcement on exceptional practices was issued for the Pharmaceutical Affairs Law Article 49 Clause 1. The law allows selling prescription medicines for patients with chronic diseases who have difficulties to continue their medications ...

  13. Earthquake forecasting during the complex Amatrice-Norcia seismic sequence.

    Science.gov (United States)

    Marzocchi, Warner; Taroni, Matteo; Falcone, Giuseppe

    2017-09-01

    Earthquake forecasting is the ultimate challenge for seismologists, because it condenses the scientific knowledge about the earthquake occurrence process, and it is an essential component of any sound risk mitigation planning. It is commonly assumed that, in the short term, trustworthy earthquake forecasts are possible only for typical aftershock sequences, where the largest shock is followed by many smaller earthquakes that decay with time according to the Omori power law. We show that the current Italian operational earthquake forecasting system issued statistically reliable and skillful space-time-magnitude forecasts of the largest earthquakes during the complex 2016-2017 Amatrice-Norcia sequence, which is characterized by several bursts of seismicity and a significant deviation from the Omori law. This capability to deliver statistically reliable forecasts is an essential component of any program to assist public decision-makers and citizens in the challenging risk management of complex seismic sequences.

  14. Managing Risk Areas in Software Development Offshoring

    DEFF Research Database (Denmark)

    Persson, John Stouby; Schlichter, Bjarne Rerup

    2015-01-01

    Software companies are increasingly offshoring development to countries with high expertise at lower cost. Offshoring involves particular risk areas that if ignored increase the likelihood of failure. However, the offshoring client’s maturity level may influence the management of these risk areas....... Against this backdrop, we present an interpretive case study of how managers perceive and mitigate the risk areas in software development offshoring with a mature CMMI level 5 (Capability Maturity Model, Integrated) software company as the client. We find that managers perceive and mitigate most...... and why managers perceive and mitigate the risk areas in this way and the implications for theory and practice in software development offshoring....

  15. CEA - Assessment of risk management for 2012

    International Nuclear Information System (INIS)

    Bonnevie, Edwige

    2013-06-01

    This report proposes an overview of the main events, actions performed by the CEA, and facts for 2012 regarding protection and monitoring of the environment, installation safety, occupational health and safety, radiological protection of workers, transportation of hazardous materials, waste management, protection of sites, installations and heritage, emergency situation management, legal risk management, internal controls and audits. It also presents the organisation and action of the risk management department within the CEA

  16. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  17. Economic Exposure and Integrated Risk Management

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    Most corporate risk management research focuses on particular risk exposures to the exclusion of other interrelated exposures. By contrast, this study models corporate risk exposures using a multivariate approach integrating the distinct exposures of interest to finance and strategy researchers. The paper addresses the implications of multivariate modeling for corporate risk management, some key methodological issues arising in empirical estimation of corporate economic exposrues, and direc...

  18. Risk management's role in corporate governance

    OpenAIRE

    Coulson-Thomas, Colin

    2017-01-01

    One of the dilemmas faced by directors is the need to be entrepreneurial in ensuring the future succcess of a company while at the same time retaining prudent control. A conversation is required among some directors and boards to review what is meant by risk and risk management, their governance responsibilities in relation to risk, and the extent to which the risk management community is perceived as a help or hinder to addressing contemporary challenges facing boards and their companies, an...

  19. Operational risk management in financial institutions

    OpenAIRE

    2014-01-01

    M.Com. (Business Management) Financial institutions and regulatory bodies of the financial services industry have, in the last decade of the 20th century, woken up to the realisation that the risk management procedures adopted and promoted by them did not take into account all the risks to which financial institutions were exposed. The one risk category, made up by an array of risks, that has been acknowledged by financial institutions and regulatory bodies for some time, but that has not ...

  20. APPLIED ISSUES ABOUT BANKING RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Elena Geanina Clipici

    2017-09-01

    Full Text Available The following paper emphasizes the need to deepen the understanding of the notion of banking risk management by explaining the significant risks the bank encounters during financial exercises as well as their additional entries. The study of the paper will focus on UniCredit Bank during the years 2014 and  2015 on all types of risks, in which we will provide comprehensive data on how the UniCredit Bank management applies its risk policies.

  1. RISK MANAGEMENT IN THE ELECTRONIC BUSINESS

    OpenAIRE

    Georgeta Soava

    2016-01-01

    Risk should not be understood as a destructive phenomenon, but bear in mind that managers who know how to use it can lead to real opportunities. Manager must first recognize the existence of risk, namely to identify and then use specific methods to avoid or reduce the risk. The purpose of this paper is to enter the world, at all simple, of risk management, relatively easy concept to understand but not so easy to put into practice. Of course, the approach relates primarily at the risks i...

  2. Disaster Risk Management - The Kenyan Challenge

    Science.gov (United States)

    Nabutola, W.; Scheer, S.

    2009-04-01

    Keywords: natural disasters; man-made disasters; terrorist attacks; land slides; disaster policies and legislations; fire; earthquakes; hurricanes; soil erosion; disaster research policy; Preamble: "Risk does not begin and end on the floor of the New York Stock Exchange. The vastness of the subject matter is daunting. Risk touches on the most profound aspects of psychology, mathematics, statistics and history. The literature is monumental; each day's headlines bring many new items of interest. But I know we are not unique, everywhere in the world risks abound." "AGAINST THE GODS the remarkable story of risk" by Peter L. Bernstein, 1998 The real challenge is what can we, as a nation do to avert, prevent them, or in the unfortunate event that they occur, how can we mitigate their impact on the economy? Introductory remarks: Disaster in Kenya, as indeed anywhere else, is not one of those happenings we can wish away. It can strike anywhere any time. Some of it is man-made but most of it is natural. The natural are sometimes induced by man in one way or another. For example, when we harvest trees without replacing them, this diminishes the forest cover and can lead to soil erosion, whose advanced form is land slides. Either way disasters in their different forms and sizes present challenges to the way we live our lives or not, perhaps, even how we die. Disasters in our country have reached crisis stage. ‘In Chinese language, crisis means danger, but it also means opportunity' Les Brown, motivational speaker in "the power of a larger vision" Why I am interested Whereas Kenya experiences man made and natural disasters, there are more sinister challenges of the man-made variety. These loom on the horizon and, from time to time raise their ugly heads, taking many Kenyan lives in their wake, and property destroyed. These are post election violence and terrorist attacks, both related to politics, internal and external. In January 2008, soon after presidential and national

  3. Disaster Risk Management - The Kenyan Challenges

    Science.gov (United States)

    Nabutola, W.

    2009-04-01

    Keywords: natural disasters; man-made disasters; terrorist attacks; land slides; disaster policies and legislations; fire; earthquakes; hurricanes; soil erosion; disaster research policy; Preamble: "Risk does not begin and end on the floor of the New York Stock Exchange. The vastness of the subject matter is daunting. Risk touches on the most profound aspects of psychology, mathematics, statistics and history. The literature is monumental; each day's headlines bring many new items of interest. But I know we are not unique, everywhere in the world risks abound." "AGAINST THE GODS the remarkable story of risk" by Peter L. Bernstein, 1998 The real challenge is what can we, as a nation do to avert, prevent them, or in the unfortunate event that they occur, how can we mitigate their impact on the economy? Introductory remarks: Disaster in Kenya, as indeed anywhere else, is not one of those happenings we can wish away. It can strike anywhere any time. Some of it is man-made but most of it is natural. The natural are sometimes induced by man in one way or another. For example, when we harvest trees without replacing them, this diminishes the forest cover and can lead to soil erosion, whose advanced form is land slides. Either way disasters in their different forms and sizes present challenges to the way we live our lives or not, perhaps, even how we die. Disasters in our country have reached crisis stage. ‘In Chinese language, crisis means danger, but it also means opportunity' Les Brown, motivational speaker in "the power of a larger vision" Why I am interested Whereas Kenya experiences man made and natural disasters, there are more sinister challenges of the man-made variety. These loom on the horizon and, from time to time raise their ugly heads, taking many Kenyan lives in their wake, and property destroyed. These are post election violence and terrorist attacks, both related to politics, internal and external. In January 2008, soon after presidential and national

  4. Probabilistic risk assessment methodology for risk management and regulatory applications

    International Nuclear Information System (INIS)

    See Meng Wong; Kelly, D.L.; Riley, J.E.

    1997-01-01

    This paper discusses the development and potential applications of PRA methodology for risk management and regulatory applications in the U.S. nuclear industry. The new PRA methodology centers on the development of This paper discusses the time-dependent configuration risk profile for evaluating the effectiveness of operational risk management programs at U.S. nuclear power plants. Configuration-risk profiles have been used as risk-information tools for (1) a better understanding of the impact of daily operational activities on plant safety, and (2) proactive planning of operational activities to manage risk. Trial applications of the methodology were undertaken to demonstrate that configuration-risk profiles can be developed routinely, and can be useful for various industry and regulatory applications. Lessons learned include a better understanding of the issues and characteristics of PRA models available to industry, and identifying the attributes and pitfalls in the developement of risk profiles

  5. The total theory about risk management

    International Nuclear Information System (INIS)

    Furuya, Shunsuke

    2003-01-01

    A general working procedure of risk management, some example of other countries, topics and problems in the future are described. A definition of risk, risk assessment, risk management process, setting of aim and definite policy are explained. As a fundamental way of thinking, risk is controlled by ALARP (As Low As Reasonably Practicable). The upper and lower limit of risk level is called as Quantitative Safety Goal and Target Level of Safety, respectively. These limits in the atomic power and airplane are decided. Evaluation of risk, countermeasure and practice are explained. For example, a permissible range of risk and practical use in England, U.S.A, Holland and Japan are stated. Recently, accountability risk, missing demand risk and control risk are important. (S.Y.)

  6. Risk management method for small photovoltaic plants

    Directory of Open Access Journals (Sweden)

    Kirova Milena

    2016-09-01

    Full Text Available Risk management is necessary for achieving the goals of the organization. There are many methods, approaches, and instruments in the literature concerning risk management. However, these are often highly specialized and transferring them to a different field can prove difficult. Therefore, managers often face situations where they have no tools to use for risk management. This is the case with small photovoltaic plants (according to a definition by the Bulgarian State Energy and Water Regulatory Commission small applies to systems with a total installed power of 200 kWp. There are some good practices in the energy field for minimizing risks, but they offer only partial risk prevention and are not sufficient. Therefore a new risk management method needs to be introduced. Small photovoltaic plants offer plenty of advantages in comparison to the other renewable energy sources which makes risk management in their case more important. There is no classification of risks for the exploitation of small photovoltaic systems in the available literature as well as to what degree the damages from those risks could spread. This makes risk analysis and evaluation necessary for obtaining information which could aid taking decisions for improving risk management. The owner of the invested capital takes a decision regarding the degree of acceptable risk for his organization and it must be protected depending on the goals set. Investors in small photovoltaic systems need to decide to what degree the existing risks can influence the goals previously set, the payback of the investment, and what is the acceptable level of damages for the investor. The purpose of this work is to present a risk management method, which currently does not exist in the Bulgaria, so that the risks and the damages that could occur during the exploitation of small photovoltaic plants could be identified and the investment in such technology – justified.

  7. Role of NDT in risk management

    International Nuclear Information System (INIS)

    Porter, Jr. James F.

    2009-01-01

    Risk management is identifying and then managing threats that could severely affect or bring down a company. This involves reviewing the operations of the company to include the process, equipment, procedures and personnel. Potential threats are then identified including their probability of occurrence, and then taking appropriate actions to address the most likely threats. Traditionally, risk management was thought of as mostly getting the right insurance. However, this impression of risk management has changed dramatically. With the recent increase in rules and regulations and optimizing utilization of key resources, risk management is becoming a management practice that is as important as financial or facilities management. In ideal risk management, a prioritization process is followed whereby the risks with the greatest loss and greatest probability of occurring are handled first, and risks with lower probability of occurrence and lower loss are handled in descending order. In practice the process can be very difficult, and balancing between risks with a high probability of occurrence but lower loss versus a risk with high but lower probability of occurrence can often be mishandled. (author)

  8. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  9. Risk management in a competitive electricity market

    International Nuclear Information System (INIS)

    Liu, Min; Wu, Felix F.

    2007-01-01

    In a competitive electricity market, it is necessary and important to develop an appropriate risk management scheme for trade with full utilization of the multi-market environment in order to maximize participants' benefits and minimize the corresponding risks. Based on the analyses to trading environments and risks in the electricity market, a layered framework of risk management for electric energy trading is proposed in this paper. Simulation results confirmed that trading among multiple markets is helpful to reduce the complete risk, and VaR provides a useful approach to judge whether the formed risk-control scheme is acceptable. (author)

  10. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions, the importa......The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions...

  11. INVENTORY AND RISK MANAGEMENT: DECREASING DELIVERY RISK OF PURCHASERS

    Directory of Open Access Journals (Sweden)

    Grzegorz MICHALSKI

    2008-12-01

    Full Text Available The basic financial purpose of an enterprise is maximization of its value. Inventory management should also contribute to realization of this fundamental aim. The enterprise value maximization strategy is executed with a focus on risk and uncertainty. This article presents the consequences for the recipients firm that can result from operating risk that is related to delivery risk generated by the suppliers. The present article offers a method that uses portfolio management theory to choose the suppliers.

  12. Characteristics and risk factors for typhoid fever after the tsunami, earthquake and under normal conditions in Indonesia

    Directory of Open Access Journals (Sweden)

    Suwa Hirohiko

    2010-04-01

    Full Text Available Abstract Background Although typhoid transmitted by food and water is a common problem in daily life, its characteristics and risk factors may differ in disaster-affected areas, which reinforces the need for rapid public health intervention. Surveys were carried out post-tsunami in Banda Aceh, post-earthquake in Yogyakarta, and under normal conditions in Bandung, Indonesia. Logistic regression analysis was used to assess the risk factors with the dependent variable of typhoid fever, with or without complications. Findings Characteristic typhoid fever with complications was found in 5 patients (11.9% affected by the tsunami in Aceh, 8 (20.5% after the earthquake in Yogyakarta, and 13 (18.6% in Bandung. After the tsunami in Aceh, clean water (OR = 0.05; 95%CI: 0.01-0.47 and drug availability (OR = 0.23; 95%CI: 0.02-2.43 are significant independent risk factors, while for the earthquake in Yogyakarta, contact with other typhoid patients (OR = 20.30; 95%CI: 1.93-213.02 and education (OR = 0.08; 95%CI: 0.01-0.98 were significant risk factors. Under normal conditions in Bandung, hand washing (OR = 0.07; 95%CI: 0.01-0.50 and education (OR = 0.08; 95%CI: 0.01-0.64 emerged as significant risk factors. Conclusion The change in risk factors for typhoid complication after the tsunami in Aceh and the earthquake in Yogyakarta emphasizes the need for rapid public health intervention in natural disasters in Indonesia.

  13. Management of limb fractures in a teaching hospital: comparison between Wenchuan and Yushu earthquakes

    Directory of Open Access Journals (Sweden)

    MIN Li

    2013-02-01

    Full Text Available 【Abstract】Objective: To comparatively analyze the medical records of patients with limb fractures as well as rescue strategy in Wenchuan and Yushu earthquakes so as to provide references for post-earthquake rescue. Methods: We retrospectively investigated 944 patients sustaining limb fractures, including 891 in Wenchuan earth-quake and 53 in Yushu earthquake, who were admitted to West China Hospital (WCH of Sichuan University. Results: In Wenchuan earthquake, WCH met its three peaks of limb fracture patients influx, on post-earthquake day (PED 2, 8 and 14 respectively. Between PED 3-14, 585 patients were transferred from WCH to other hospitals out-side the Sichuan Province. In Yushu earthquake, the maxi-mum influx of limb fracture patients happened on PED 3, and no one was shifted to other hospitals. Both in Wenchuan and Yushu earthquakes, most limb fractures were caused by blunt strike and crush/burying. In Wenchuan earthquake, there were 396 (396/942, 42.0% open limb fractures, includ-ing 28 Gustilo I, 201 Gustilo II and 167 Gustilo III injuries. But in Yushu earthquake, the incidence of open limb frac-ture was much lower (6/61, 9.8%. The percent of patients with acute complications in Wenchuan earthquake (167/891, 18.7% was much higher than that in Yushu earthquake (5/53, 3.8%. In Wenchuan earthquake rescue, 1 018 surgeries were done, composed of debridement in 376, internal fixation in 283, external fixation in 119, and vacuum sealing drainage in 117, etc. While among the 64 surgeries in Yushu earthquake rescue, the internal fixation for limb fracture was mostly adopted. All patients received proper treatment and sur-vived except one who died due to multiple organs failure in Wenchuan earthquake. Conclusion: Provision of suitable and sufficient medi-cal care in a catastrophe can only be achieved by construc-tion of sophisticated national disaster medical system, pre-diction of the injury types and number of injuries, and con-firmation of

  14. Earthquake Magnitude and Shaking Intensity Dependent Fragility Functions for Rapid Risk Assessment of Buildings

    Directory of Open Access Journals (Sweden)

    Marie-José Nollet

    2018-01-01

    Full Text Available An integrated web application, referred to as ER2 for rapid risk evaluator, is under development for a user-friendly seismic risk assessment by the non-expert public safety community. The assessment of likely negative consequences is based on pre-populated databases of seismic, building inventory and vulnerability parameters. To further accelerate the computation for near real-time analyses, implicit building fragility curves were developed as functions of the magnitude and the intensity of the seismic shaking defined with a single intensity measure, input spectral acceleration at 1.0 s implicitly considering the epicentral distance and local soil conditions. Damage probabilities were compared with those obtained with the standard fragility functions explicitly considering epicentral distances and local site classes in addition to the earthquake magnitudes and respective intensity of the seismic shaking. Different seismic scenarios were considered first for 53 building classes common in Eastern Canada, and then a reduced number of 24 combined building classes was proposed. Comparison of results indicate that the damage predictions with implicit fragility functions for short (M ≤ 5.5 and medium strong motion duration (5.5 < M ≤ 7.5 show low variation with distance and soil class, with average error of less than 3.6%.

  15. Cattle farmers’ perceptions of risk and risk management strategies

    DEFF Research Database (Denmark)

    Bishu, Kinfe G.; O'Reilly, Seamus; Lahiff, Edward

    2018-01-01

    regression is then used to investigate the relationship between scores and farmers’ characteristics. The results demonstrate that shortage of family labor, high price of fodder, and limited farm income were perceived as the most important risks. Use of veterinary services, parasite control, and loan......This study analyzes cattle farmers’ perceptions of risk and risk management strategies in Tigray, Northern Ethiopia. We use survey data from a sample of 356 farmers based on multistage random sampling. Factor analysis is employed to classify scores of risk and management strategies, and multiple...... utilization were perceived as the most important strategies for managing risks. Livestock disease and labor shortage were perceived as less of a risk by farmers who adopted the practice of zero grazing compared to other farmers, pointing to the potential of this practice for risk reduction. We find strong...

  16. Model risk analysis for risk management and option pricing

    NARCIS (Netherlands)

    Kerkhof, F.L.J.

    2003-01-01

    Due to the growing complexity of products in financial markets, market participants rely more and more on quantitative models for trading and risk management decisions. This introduces a fairly new type of risk, namely, model risk. In the first part of this thesis we investigate the quantitative

  17. Risk Management In Perspective Of Knowledge Management A Brief Survey

    Science.gov (United States)

    Rehman, Zobia; Kifor, Claudiu V.

    2015-09-01

    This article explains the application of knowledge management for project risk management in industry. Combination of knowledge management and risk management is becoming a dire need for industries nowadays, because it has become necessary to make information reach timely to its destined users to achieve the desired goals. Quick decisions are needed throughout a project life cycle to mitigate or avoid a risk, but they are only possible when knowledge about it is in hand and can be inferred for fruitful decisions. Quality engineers make huge effort in analyzing and mitigating the risk and prepare various documents about different risk management stages. But this knowledge resides in documents or underutilized databases without any relation to each other that makes it useless for complex decision making. This article shall explain how knowledge management activities are helpful in risk management and the advantages of their fusion. It will also present a conceptual architecture of an Information Technology based solution for risk management and knowledge management combination.

  18. Managing Actuaries\\' Professional Risk | Lowther | South African ...

    African Journals Online (AJOL)

    This paper describes a new concept, of vital importance to actuaries, which the authors have named \\'managing actuaries\\' professional risk\\'. Much has been written on the constituent elements of legal causation, risk management, indemnity insurance and professional conduct standards. This paper envisages an ...

  19. RISK MANAGEMENT PROCESSES IN SUPPLY CHAINS

    Directory of Open Access Journals (Sweden)

    Aleksandar Aleksić

    2009-06-01

    Full Text Available One of the keys of successful business last few years is effective dealing with risks in every meaning of that word. At the time when the world economic crisis largely limits business, successful Risk management is the only way of survival for a large number of business systems. This paper will present the processes of risk management in supply chains that are in accordance with the standards ISO 28000 and ISO 31000. By implementing a holistic, enterprise-wide supply chain risk management program, companies also can uphold their commitment to providing strong corporate governance on behalf of stakeholders and increase their market value.

  20. Management of limb fractures in a teaching hospital: comparison between Wenchuan and Yushu earthquakes.

    Science.gov (United States)

    Min, Li; Tu, Chong-qi; Liu, Lei; Zhang, Wen-li; Yi, Min; Song, Yue-ming; Huang, Fu-guo; Yang, Tian-fu; Pei, Fu-xing

    2013-01-01

    To comparatively analyze the medical records of patients with limb fractures as well as rescue strategy in Wenchuan and Yushu earthquakes so as to provide references for post-earthquake rescue. We retrospectively investigated 944 patients sustaining limb fractures, including 891 in Wenchuan earthquake and 53 in Yushu earthquake, who were admitted to West China Hospital (WCH) of Sichuan University. In Wenchuan earthquake, WCH met its three peaks of limb fracture patients influx, on post-earthquake day (PED) 2, 8 and 14 respectively. Between PED 3-14, 585 patients were transferred from WCH to other hospitals outside the Sichuan Province. In Yushu earthquake, the maximum influx of limb fracture patients happened on PED 3, and no one was shifted to other hospitals. Both in Wenchuan and Yushu earthquakes, most limb fractures were caused by blunt strike and crush/burying. In Wenchuan earthquake, there were 396 (396/942, 42.0%) open limb fractures, including 28 Gustilo I, 201 Gustilo II and 167 Gustilo III injuries. But in Yushu earthquake, the incidence of open limb fracture was much lower (6/61, 9.8%). The percent of patients with acute complications in Wenchuan earthquake (167/891, 18.7%) was much higher than that in Yushu earthquake (5/53, 3.8%). In Wenchuan earthquake rescue, 1 018 surgeries were done, composed of debridement in 376, internal fixation in 283, external fixation in 119, and vacuum sealing drainage in 117, etc. While among the 64 surgeries in Yushu earthquake rescue, the internal fixation for limb fracture was mostly adopted. All patients received proper treatment and survived except one who died due to multiple organs failure in Wenchuan earthquake. Provision of suitable and sufficient medical care in a catastrophe can only be achieved by construction of sophisticated national disaster medical system, prediction of the injury types and number of injuries, and confirmation of participating hospitals?exact role. Based on the valuable rescue experiences

  1. Strategic Risk Management and Corporate Value Creation

    DEFF Research Database (Denmark)

    Andersen, Torben Juul; Roggi, Oliviero

    Major corporate failures, periodic recessions, regional debt crises and volatile markets have intensified the focus on corporate risk management as the means to deal better with turbulent business conditions. Hence, the ability to respond effectively to the often dramatic environmental changes...... is considered an important source of competitive advantage. However, surprisingly little research has analyzed if the presumed advantages of effective risk management lead to superior performance or assessed important antecedents of effective risk management capabilities. Here we present a comprehensive study...... of risk management effectiveness and the relationship to corporate performance based on panel data for more than 3,400 firms accounting for over 33,500 annual observations during the turbulent period 1991-2010. Determining effective risk management as the ability to reduce earnings and cash flow...

  2. Risk, innovation and change : design propositions for implementing risk management in organizations

    NARCIS (Netherlands)

    van Staveren, Martinus Theodorus

    2009-01-01

    This Ph.D. research generated unique design propositions for implementing existing risk management methodologies in organizations. The resulting design propositions incorporate a synthesis of risk management, innovation management and change management. True implementation of risk management is

  3. Lessons from the conviction of the L'Aquila seven: The standard probabilistic earthquake hazard and risk assessment is ineffective

    Science.gov (United States)

    Wyss, Max

    2013-04-01

    An earthquake of M6.3 killed 309 people in L'Aquila, Italy, on 6 April 2011. Subsequently, a judge in L'Aquila convicted seven who had participated in an emergency meeting on March 30, assessing the probability of a major event to follow the ongoing earthquake swarm. The sentence was six years in prison, a combine fine of 2 million Euros, loss of job, loss of retirement rent, and lawyer's costs. The judge followed the prosecution's accusation that the review by the Commission of Great Risks had conveyed a false sense of security to the population, which consequently did not take their usual precautionary measures before the deadly earthquake. He did not consider the facts that (1) one of the convicted was not a member of the commission and had merrily obeyed orders to bring the latest seismological facts to the discussion, (2) another was an engineer who was not required to have any expertise regarding the probability of earthquakes, (3) and two others were seismologists not invited to speak to the public at a TV interview and a press conference. This exaggerated judgment was the consequence of an uproar in the population, who felt misinformed and even mislead. Faced with a population worried by an earthquake swarm, the head of the Italian Civil Defense is on record ordering that the population be calmed, and the vice head executed this order in a TV interview one hour before the meeting of the Commission by stating "the scientific community continues to tell me that the situation is favorable and that there is a discharge of energy." The first lesson to be learned is that communications to the public about earthquake hazard and risk must not be left in the hands of someone who has gross misunderstandings about seismology. They must be carefully prepared by experts. The more significant lesson is that the approach to calm the population and the standard probabilistic hazard and risk assessment, as practiced by GSHAP, are misleading. The later has been criticized as

  4. Decisionmaking under risk in invasive species management: risk management theory and applications

    Science.gov (United States)

    Shefali V. Mehta; Robert G. Haight; Frances R. Homans

    2010-01-01

    Invasive species management is closely entwined with the assessment and management of risk that arises from the inherently random nature of the invasion process. The theory and application of risk management for invasive species with an economic perspective is reviewed in this synthesis. Invasive species management can be delineated into three general categories:...

  5. Internal audit risk management in metropolitan municipalities

    Directory of Open Access Journals (Sweden)

    Christo Ackermann

    2016-07-01

    Full Text Available Internal audit functions (IAFs of organisations are regarded as crucial components of the combined assurance model, alongside the audit committee, management and external auditors. The combined assurance model aims at having integrated and aligned assurance in organisations with the overall aim of maximising risk and governance oversight and control efficiencies. In this regard, internal audit plays a crucial role, insofar as it consists of experts in risk, governance and control consultancy who provide assurance to senior management and the audit committee. Audit committees are dependent on internal audit for information and their effectiveness revolves around a strong and well-resourced internal audit function which is able to aid audit committees to meet their oversight responsibilities. There is thus a growing demand for managing risk through the process of risk management and internal audit is in a perfect position to assist with the improvement of such processes. If internal auditors wish to continue being an important aspect of the combined assurance model, they need to address the critical area, amongst others, of risk management as part of their work. If not, it follows that the board, audit committees and other levels of management will remain uninformed on the status of these matters which, in turn, will negatively impact the ability of these stakeholders to discharge their responsibilities. This study therefore focuses on analysing the functioning of IAFs, with specific reference to their risk management mandate. The study followed a mixed method approach to describe internal audits risk management functioning in the big eight metropolitan municipalities in South Africa. The results show that internal audit provide a broad scope of risk management work which assist senior management in the discharge of their responsibilities. However, in the public eye, internal audits risk management functioning is scant

  6. Risk assessment and management logistics chains

    Directory of Open Access Journals (Sweden)

    Vladimir Vikulov

    2014-03-01

    Full Text Available Background: In the context of economic globalization and increasing complexity of economic relations enterprises need methods and techniques to improve and sustain their position on the global market. Integration processes offer business new opportunities, but at the same time present new challenges for the management, including the key objectives of the risk management. Method: On the basis of analysis tools known from the pertinent literature (Supply Chain Management and Supply Chain Risk Management methods, methods of probability theory, methods of risk management, methods of statistics the authors of this paper proposed their own risk assessment method and the method of management of logistics chains. The proposed tool is a specific hybrid of solutions known from the literature. Results: The presented method has been successfully used within the frames of economic-mathematical model of industrial enterprises. Indicators of supply chain risks, including risks caused by supplier are considered in this paper. Authors formed a method of optimizing the level of supply chain risk in the integration with suppliers and customers. Conclusion: Every organization, which starting the process of integration with supplier and customers, needs to use tools, methodologies and techniques for identification of "weak links" in the supply chain. The proposed method allows to fix risk origin places in various links of the supply chain and to identify "weak links" of a logistic chain that may occur in the future. The method is a useful tool for managing not only risks and risk situations, but also to improve the efficiency of current assets management by providing the ability to optimize the level of risk in the current assets management of the industrial enterprise.

  7. Risk Management as Part of Crisis Management Tasks

    Directory of Open Access Journals (Sweden)

    Skomra Witold

    2017-02-01

    Full Text Available The increasing number of natural disasters requires the use of preventive measures. One of the elements is the inclusion of risk management in crisis management. On the basis of this observation, the research problem was formulated: “In the light of new challenges, should the crisis management system continue to be built on the theory of crisis within the security sciences, or should it be based on risk management developed in the area of management sciences?” In summary, the answer to the question was provided, and a new definition of the concept of “crisis management” was proposed.

  8. Healthcare waste management during disasters and its effects on climate change: Lessons from 2010 earthquake and cholera tragedies in Haiti.

    Science.gov (United States)

    Raila, Emilia M; Anderson, David O

    2017-03-01

    Despite growing effects of human activities on climate change throughout the world, and global South in particular, scientists are yet to understand how poor healthcare waste management practices in an emergency influences the climate change. This article presents new findings on climate change risks of healthcare waste disposal during and after the 2010 earthquake and cholera disasters in Haiti. The researchers analysed quantities of healthcare waste incinerated by the United Nations Mission in Haiti for 60 months (2009 to 2013). The aim was to determine the relationship between healthcare waste incinerated weights and the time of occurrence of the two disasters, and associated climate change effects, if any. Pearson product-moment correlation coefficient indicated a weak correlation between the quantities of healthcare waste disposed of and the time of occurrence of the actual emergencies (r (58) = 0.406, p = 0.001). Correspondingly, linear regression analysis indicated a relatively linear data trend (R 2 = 0.16, F (1, 58) = 11.42, P = 0.001) with fluctuating scenarios that depicted a sharp rise in 2012, and time series model showed monthly and yearly variations within 60 months. Given that the peak healthcare waste incineration occurred 2 years after the 2010 disasters, points at the need to minimise wastage on pharmaceuticals by improving logistics management. The Government of Haiti had no data on healthcare waste disposal and practised smoky open burning, thus a need for capacity building on green healthcare waste management technologies for effective climate change mitigation.

  9. Desertification risk assessment and management program

    OpenAIRE

    M. Akbari; M. Ownegh; H.R. Asgari; A. Sadoddin; H. Khosravi

    2016-01-01

    Risk assessment provides the possibility of planning and management to prevent and reduce the risk of desertification. The present study is aimed to assess the hazard and risk of desertification and to develop management programs in the semi-arid western regions of Golestan Province in Iran. Desertification rate was obtained using the Iranian model of desertification potential assessment. Since the rating system was considered for the indicators, data analyses were carried out according to th...

  10. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  11. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  12. RISKS MANAGEMENT. A PROPENSITY SCORE APPLICATION

    Directory of Open Access Journals (Sweden)

    Constangioara Alexandru

    2008-05-01

    Full Text Available Risk management is relatively unexplored in Romania. Although Romanian specialists dwell on theoretical aspects such as the risks classification and the important distinction between risks and uncertainty the practical relevance of the matter is outside existing studies. Present paper uses a dataset of consumer data to build a propensity scorecard based on relevant quantitative modeling.

  13. Increased prevalence of atrial fibrillation after the Great East Japan Earthquake: Results from the Fukushima Health Management Survey.

    Science.gov (United States)

    Suzuki, Hitoshi; Ohira, Tetsuya; Takeishi, Yasuchika; Hosoya, Mitsuaki; Yasumura, Seiji; Satoh, Hiroaki; Kawasaki, Yukihiko; Takahashi, Atsushi; Sakai, Akira; Ohtsuru, Akira; Kobashi, Gen; Ozasa, Kotaro; Yamashita, Shunichi; Kamiya, Kenji; Abe, Masafumi

    2015-11-01

    Previous studies have shown that control of cardiovascular risk factors deteriorates among residents after a natural disaster. This study assessed the hypothesis that the prevalence of atrial fibrillation (AF) increased among residents in the evacuation zone of Fukushima prefecture after the Great East Japan Earthquake. This longitudinal study examined subjects aged 40-90 years using data collected from 26,163 participants (11,628 men and 14,535 women) sourced from general health checkups conducted in twelve communities, including the evacuation zone specified by the government, between 2008 and 2010. The study obtained 12-lead ECG tracings and conducted follow-up examinations from June 2011 to the end of March 2013. A total of 12,410 participants (5704 men and 6706 women, follow-up proportion: 47%) received follow-up examinations after the earthquake, with an average follow-up of 1.4 years. The prevalence of AF increased among participants after the earthquake (before: 1.9% vs. after: 2.4%, Pearthquake, with multivariable-adjusted hazard ratios (95% confidence interval) of 3.07 (1.55-6.08) and 1.87 (1.19-2.94), respectively. The prevalence of AF increased among residents in the evacuation zone of Fukushima prefecture after the Great East Japan Earthquake, with excess alcohol intake and obesity associated with an increased risk of AF. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  14. Risks in hospitals. Assessment and Management

    Directory of Open Access Journals (Sweden)

    Bradea Ioana-Alexandra

    2014-12-01

    Full Text Available In a complex world, characterized by a multitude of risks, managers need to manage the risks they encounter, in an efficient way and in the shortest time possible. In the current economic crisis, the concept of hospital risk management, as the process in which is identified, analyzed, reduced, or avoided a risk that may affect the hospital, gained great importance. The Romanian health system, distinguished by: lack of transparency, poor funding, the loss of the valuable medical staff, lack of hospitals in villages and small towns, inability to engage patients due to the old and poor equipment, lack of research and problems in information privacy and cyber-security, requires an appropriate management, enabling risk managers to take decisions in order to avoid the occurrence of risks. Important for the functioning of every hospital is the perception of patients and their degree of satisfaction, regarding the quality of services, which depend largely on the quality of human resources. But what are the human resources weaknesses and risks from the patient point of view? What are the risk indicators which must be monitored to avoid risks? And also, which is the most useful method for measurement and assessment of risk?

  15. Managing the risk of injury in sport.

    Science.gov (United States)

    Fuller, Colin W

    2007-05-01

    Because the risk of injury in many sports is high, governing bodies and individuals involved with these sports have a responsibility to manage the risks at acceptable levels. Risk management provides a structured framework within which risks can be identified, evaluated, assessed, and controlled through appropriate mitigation strategies. Exploring inferences obtained from the relationship between risk and the incidence and severity of injury contributes to the understanding and control of risks in sport. Studies related to intrinsic and extrinsic risk factors should be focused on determining which factors cause an athlete's risk level to fall within the high-risk or low-risk regions of the population's risk distribution. Risk values can be used to derive risk contours, which illustrate the interdependence of incidence and severity on the development of effective risk mitigation strategies. The wide variation in the levels of risk across different sports is used to demonstrate the impact that athletes' perception and acceptance of risk have on their choice of sport. Finally, the use of incidence and severity data for predicting the prevalence of injury in a team and for the economic evaluation of intervention programmes is discussed.

  16. LastQuake: a comprehensive strategy for rapid engagement of earthquake eyewitnesses, massive crowdsourcing and risk reduction

    Science.gov (United States)

    Bossu, R.; Roussel, F.; Mazet-Roux, G.; Steed, R.; Frobert, L.

    2015-12-01

    LastQuake is a smartphone app, browser add-on and the most sophisticated Twitter robot (quakebot) for earthquakes currently in operation. It fulfills eyewitnesses' needs by offering information on felt earthquakes and their effects within tens of seconds of their occurrence. Associated with an active presence on Facebook, Pinterest and on websites, this proves a very efficient engagement strategy. For example, the app was installed thousands of times after the Ghorka earthquake in Nepal. Language barriers have been erased by using visual communication; for example, felt reports are collected through a set of cartoons representing different shaking levels. Within 3 weeks of the magnitude 7.8 Ghorka earthquakes, 7,000 felt reports with thousands of comments were collected related to the mainshock and tens of its aftershocks as well as 100 informative geo-located pics. The QuakeBot was essential in allowing us to be identified so well and interact with those affected. LastQuake is also a risk reduction tool since it provides rapid information. Rapid information is similar to prevention since when it does not exist, disasters can happen. When no information is available after a felt earthquake, the public block emergency lines by trying to find out the cause of the shaking, crowds form potentially leading to unpredictable crowd movement, rumors spread. In its next release LastQuake will also provide people with guidance immediately after a shaking through a number of pop-up cartoons illustrating "do/don't do" items (go to open places, do not phone emergency services except if people are injured…). LastQuake's app design is simple and intuitive and has a global audience. It benefited from a crowdfunding campaign (and the support of the Fondation MAIF) and more improvements have been planned after an online feedback campaign organized in early June with the Ghorka earthquake eyewitnesses. LastQuake is also a seismic risk reduction tools thanks to its very rapid

  17. Prevalence and psychosocial risk factors of PTSD: 18 months after Kashmir earthquake in Pakistan.

    Science.gov (United States)

    Naeem, Farooq; Ayub, Muhammad; Masood, Khadija; Gul, Huma; Khalid, Mahwish; Farrukh, Ammara; Shaheen, Aisha; Waheed, Waquas; Chaudhry, Haroon Rasheed

    2011-04-01

    On average in a year 939 earthquakes of a magnitude between 5 and 8 on the Richter scale occur around the world. In earthquakes developing countries are prone to large-scale destruction because of poor structural quality of buildings, and preparedness for earthquakes. On 8th October 2005, a major earthquake hit the remote and mountainous region of northern Pakistan and Kashmir. We wanted to find out the rate of PTSD in a randomly selected sample of participants living in earthquake area and the correlates of the PTSD. The study was conducted 18 months after the earthquake. We selected a sample of men and women living in the houses and tents for interviews. Using well established instruments for PTSD and general psychiatric morbidity we gathered information from over 1200 people in face to face interviews. We gathered information about trauma exposure and loss as well. 55.2% women and 33.4% men suffered from PTSD. Living in a joint family was protective against the symptoms of PTSD. Dose of exposure to trauma was associated with the symptoms of PTSD. Living in a tent was associated with general psychiatric morbidity but not with PTSD. We used questionnaire instead of interviews to detect the symptoms of psychiatric disorders. The symptoms of PTSD are common 18 months after the earthquake and they are specifically associated with the dose of trauma exposure. This may have implications for rehabilitation of this population. Copyright © 2010 Elsevier B.V. All rights reserved.

  18. Risk Management and Risk Psychology in Romanian Sme’s

    Directory of Open Access Journals (Sweden)

    Irina Dănciulescu

    2015-12-01

    Full Text Available Risk is one of the biggest and most fascinating challenges of all times for humanity, because of its presence in all fields. Risk management as a component of modern management, has become a main concern for the modern world and one of the “key mechanisms” of economic development, a complex processn that includes a series of activities meant to alleviate the impact of risk over business and planed or foreseen results. This paper wants to bring to attention the importance of risks and their management in today’s economic crisis. The sector presented is the IT& C, especially software, because Romania had a growth in this area for a few years but beginning the crisis this segment in economy had known a serious decrease. This paper tries to connect risk management and risk psychology to Romanian economy, culture and mentality. The paper presents in short some of risk management characteristics, definitions and few opinions; why in Romania this subject is not treated with the appropriate attention. The paper at hand focuses on the psychology of risk and how it affects the life of individuals and the existence of companies, the importance it should have on day to day basis, especially in Romania

  19. Models for assessing and managing credit risk

    Directory of Open Access Journals (Sweden)

    Neogradi Slađana

    2014-01-01

    Full Text Available This essay deals with the definition of a model for assessing and managing credit risk. Risk is an inseparable component of any average and normal credit transaction. Looking at the different aspects of the identification and classification of risk in the banking industry as well as representation of the key components of modern risk management. In the first part of the essay will analyze how the impact of credit risk on bank and empirical models for determining the financial difficulties in which the company can be found. Bank on the basis of these models can reduce number of approved risk assets. In the second part, we consider models for improving credit risk with emphasis on Basel I, II and III, and the third part, we conclude that the most appropriate model and gives the best effect for measuring credit risk in domestic banks.

  20. Crowdsourced earthquake early warning

    Science.gov (United States)

    Minson, Sarah E.; Brooks, Benjamin A.; Glennie, Craig L.; Murray, Jessica R.; Langbein, John O.; Owen, Susan E.; Heaton, Thomas H.; Iannucci, Robert A.; Hauser, Darren L.

    2015-01-01

    Earthquake early warning (EEW) can reduce harm to people and infrastructure from earthquakes and tsunamis, but it has not been implemented in most high earthquake-risk regions because of prohibitive cost. Common consumer devices such as smartphones contain low-cost versions of the sensors used in EEW. Although less accurate than scientific-grade instruments, these sensors are globally ubiquitous. Through controlled tests of consumer devices, simulation of an Mw (moment magnitude) 7 earthquake on California’s Hayward fault, and real data from the Mw 9 Tohoku-oki earthquake, we demonstrate that EEW could be achieved via crowdsourcing.

  1. FINANCIAL RISK MANAGEMENT IN TRADE BANKS

    Directory of Open Access Journals (Sweden)

    Ms. Tamara Ye. Kononenko

    2016-09-01

    Full Text Available The paper clarifies the concepts of «risk», «financial risk» in banking business, and considers the main problems of financial risk management in trade banks while financing borrowers. The authors single out the most relevant problems, and conduct the analysis of overdue payment in case of OJSC “Sberbank of Russia”. The authors also offer a number of measures to minimize financial risks in trade bank activities in modern conditions.

  2. Individual Risk Management for Digital Payment Systems

    OpenAIRE

    M. Reichenbach; T. Grzebiela; T. Koltzsch; I. Pippow

    2002-01-01

    Despite existing security standards and security technologies, such as secure hardware, gaps between users’ demand for security and the security offered by a payment system can still remain. These security gaps imply risks for users. In this paper, we introduce a framework for the management of those risks. As a result, we present an instrument enabling users to evaluate eventual risks related with digital payment systems and to handle these risks with technical and economic instruments.

  3. Quality Risk Management of Compliant Excipients

    Directory of Open Access Journals (Sweden)

    Brian Carlin

    2012-12-01

    Full Text Available Raw material compliance and GMP do not eliminate variability. Quality by Design should minimize the risk that raw material variability will adversely affect the finished product Critical Quality Attributes. The sources of technological risk from excipients are reviewed and approaches to excipient risk management are discussed. Supplier involvement throughout the product life-cycle is recommended to minimize excipient-related risk.

  4. Sustainable Risk Management in the Banking Sector

    Directory of Open Access Journals (Sweden)

    Županović Ivo

    2014-01-01

    Full Text Available The globalization of financial markets and negative consequences of the financial crisis resulted in negative connotations in the operation of many financial institutions, businesses and citizens and imposed the need to implement appropriate risk management measures in the banking sector. Evolution of the financial sector makes a lot of news in the field of risk management and particularly the modelling of market, credit and operational risk. The main methodology for risk management is the value-at-risk, which is used in practice with other techniques such as the capital- at-risk method in order to minimize business risks and achieve optimal results in the banking and, generally, financial operations. Accordingly, at all levels of governance in the banking sector, there are prudential policies in place governing the management of all types of financial and operational risks. Based on the abovementioned, the focus of the examination was on the above postulate, and prompt recognition, control and proper management of banking risks.

  5. Intentional risk management through complex networks analysis

    CERN Document Server

    Chapela, Victor; Moral, Santiago; Romance, Miguel

    2015-01-01

    This book combines game theory and complex networks to examine intentional technological risk through modeling. As information security risks are in constant evolution,  the methodologies and tools to manage them must evolve to an ever-changing environment. A formal global methodology is explained  in this book, which is able to analyze risks in cyber security based on complex network models and ideas extracted from the Nash equilibrium. A risk management methodology for IT critical infrastructures is introduced which provides guidance and analysis on decision making models and real situations. This model manages the risk of succumbing to a digital attack and assesses an attack from the following three variables: income obtained, expense needed to carry out an attack, and the potential consequences for an attack. Graduate students and researchers interested in cyber security, complex network applications and intentional risk will find this book useful as it is filled with a number of models, methodologies a...

  6. Risk Management in Biologics Technology Transfer.

    Science.gov (United States)

    Toso, Robert; Tsang, Jonathan; Xie, Jasmina; Hohwald, Stephen; Bain, David; Willison-Parry, Derek

    Technology transfer of biological products is a complex process that is important for product commercialization. To achieve a successful technology transfer, the risks that arise from changes throughout the project must be managed. Iterative risk analysis and mitigation tools can be used to both evaluate and reduce risk. The technology transfer stage gate model is used as an example tool to help manage risks derived from both designed process change and unplanned changes that arise due to unforeseen circumstances. The strategy of risk assessment for a change can be tailored to the type of change. In addition, a cross-functional team and centralized documentation helps maximize risk management efficiency to achieve a successful technology transfer. © PDA, Inc. 2016.

  7. Risk management and safety culture

    International Nuclear Information System (INIS)

    Takano, K.

    2007-01-01

    Paper informs on the efforts to elaborate a feedback system for risk comprehensive evaluation and a system to improve structure safety foreseeing the possibility to control the latent risk, ensuring the qualitative evaluation of the safety level and improvement of safety culture in various branches of industry, first and foremost, in the electricity producing sector including the nuclear power industry [ru

  8. Managers facing the climatic risks

    International Nuclear Information System (INIS)

    2003-01-01

    This colloquium aimed to analyze the relations between the climatic changes and extreme meteorological events and on the associated risks. It provides information and knowledge on the state of the art concerning the today scientific knowledge, the prevention measures and the adaptation facing the risks and the difficult estimation of the climatic damages costs. (A.L.B.)

  9. Credit risk management in the power sector

    International Nuclear Information System (INIS)

    Allen, D.

    2002-01-01

    Deregulation of the electric power industry has the potential to put power businesses at market risk particularly when the value of an asset or liability will change with market movements. Market risk gives rise to credit risk where a contract cannot be fulfilled. This presentation describes how credit risks can be identified and measured. Most practitioners use some variant of value-at-risk (VAR) technology for measuring market risk. Under this approach, risk is determined by the volatility implied by the market. Volatility of electricity prices and natural gas prices has increased significantly in Alberta in recent years. The consequence is an increase in both market and credit risk. The author described the difference between the two risks and their significance. An overview of credit risk management with derivatives, an over-the counter contract, was also presented. The author also discusses issue of protection buyers in the event of a failed contract. 9 figs

  10. Practical Risk Management for the CIO

    CERN Document Server

    Scherling, Mark

    2007-01-01

    The growing complexity of today's interconnected systems has not only increased the need for improved information security, but also helped to move information from the IT backroom to the executive boardroom as a strategic asset. And, just like the tip of an iceberg is all you see until you run into it, the risks to your information are mostly invisible until disaster strikes. Detailing procedures that will help your team perform better risk assessments and aggregate results into more meaningful metrics, Practical Risk Management for the CIO approaches information risk management through impro

  11. Practical Methods for Information Security Risk Management

    Directory of Open Access Journals (Sweden)

    Cristian AMANCEI

    2011-01-01

    Full Text Available The purpose of this paper is to present some directions to perform the risk man-agement for information security. The article follows to practical methods through question-naire that asses the internal control, and through evaluation based on existing controls as part of vulnerability assessment. The methods presented contains all the key elements that concurs in risk management, through the elements proposed for evaluation questionnaire, list of threats, resource classification and evaluation, correlation between risks and controls and residual risk computation.

  12. The Temblor mobile seismic risk app, v2: Rapid and seamless earthquake information to inspire individuals to recognize and reduce their risk

    Science.gov (United States)

    Stein, R. S.; Sevilgen, V.; Sevilgen, S.; Kim, A.; Jacobson, D. S.; Lotto, G. C.; Ely, G.; Bhattacharjee, G.; O'Sullivan, J.

    2017-12-01

    Temblor quantifies and personalizes earthquake risk and offers solutions by connecting users with qualified retrofit and insurance providers. Temblor's daily blog on current earthquakes, seismic swarms, eruptions, floods, and landslides makes the science accessible to the public. Temblor is available on iPhone, Android, and mobile web app platforms (http://temblor.net). The app presents both scenario (worst case) and probabilistic (most likely) financial losses for homes and commercial buildings, and estimates the impact of seismic retrofit and insurance on the losses and safety. Temblor's map interface has clickable earthquakes (with source parameters and links) and active faults (name, type, and slip rate) around the world, and layers for liquefaction, landslides, tsunami inundation, and flood zones in the U.S. The app draws from the 2014 USGS National Seismic Hazard Model and the 2014 USGS Building Seismic Safety Council ShakeMap scenari0 database. The Global Earthquake Activity Rate (GEAR) model is used worldwide, with active faults displayed in 75 countries. The Temblor real-time global catalog is merged from global and national catalogs, with aftershocks discriminated from mainshocks. Earthquake notifications are issued to Temblor users within 30 seconds of their occurrence, with approximate locations and magnitudes that are rapidly refined in the ensuing minutes. Launched in 2015, Temblor has 650,000 unique users, including 250,000 in the U.S. and 110,000 in Chile, as well as 52,000 Facebook followers. All data shown in Temblor is gathered from authoritative or published sources and is synthesized to be intuitive and actionable to the public. Principal data sources include USGS, FEMA, EMSC, GEM Foundation, NOAA, GNS Science (New Zealand), INGV (Italy), PHIVOLCS (Philippines), GSJ (Japan), Taiwan Earthquake Model, EOS Singapore (Southeast Asia), MTA (Turkey), PB2003 (plate boundaries), CICESE (Baja California), California Geological Survey, and 20 other state

  13. Risk perception as a driver for risk management policies

    Science.gov (United States)

    Carmona, María; Mañez, María

    2016-04-01

    Risk is generally defined as the "combination of the probability of the occurrence of an event and its negative consequences" ( UNISDR, 2009). However, the perception of a risk differs among cultures regarding different features such as the context,causes, benefits or damage. Risk perception is the subjective valuation of the probability of an event happening and how concerned individuals or groups are with the consequences (Sjöberg, 2004). Our study is based on an existing framework for risk perception (Rehn and Rohrmann, 2000). We analyse the characteristics of the risk perception regarding extreme events (e.g.droughts) and how the perception of the group drives the action to manage the risk. We do this to achieve an overview of the conditions that let stakeholders join each other to improve risk management especially when governments are not reacting properly. For our research, attention is paid on risk perception of Multi-Sector Partnerships not taking into account the individual level of risk perception. We focus on those factors that make risk management effective and increase resilience. Multi-Sector Partnerships, considered as significant governance structures for risk management, might contribute to reduce vulnerability in prone areas to natural hazards and disasters. The Multi-Sector Partnerships used for our research are existing partnerships identified in the cases studies of the European project ENHANCE. We implement a survey to analyse the perception of risk in the case studies. That survey is based on the Cultural Theory (Douglas and Wildavsky, 1982)and the Protection Motivation Theory (Rogers, 1975). We analyse the results using the Qualitative-Comparative Analysis proposed by Ragin in 1987. The results show the main characteristics of a risk culture that are beneficial to manage a risk. Those characteristics are shaped by the perception of risk of the people involved in the partnership, which in turn shapes their risk management. Nevertheless, we

  14. Social Risk and the Management of MNCs

    DEFF Research Database (Denmark)

    Taarup Esbensen, Jacob

    2015-01-01

    Multinational companies (MNCs) are increasing being exposed to risk that originate from local communities in the business environment where they operate. The response has been to implement systems for stakeholder engagement by including social issues into their risk management systems. However, t...... practices, operationalised through Corporate Social Responsibility (CSR) systems, with communication theory and risk as frames of meaning constructed by community members and corporate decision makers.......Multinational companies (MNCs) are increasing being exposed to risk that originate from local communities in the business environment where they operate. The response has been to implement systems for stakeholder engagement by including social issues into their risk management systems. However......, these seem to be ineffective in mitigating local community grievances. In this paper I argue that social risk is to be defined in terms of how local stakeholders construct reality through a sensemaking and framing process which constitute at risk by its combined capability to influence organisational value...

  15. Characteristics of Managing Operational Banking Risk

    Directory of Open Access Journals (Sweden)

    Adela Socol

    2008-12-01

    Full Text Available The objective of this paper is to provide a global perspective of the operational risk from a banking societies’ viewpoint. We describe the main regulations and settlements in the field and examine the various approaches of the operational banking risk. The paper presents the need of banks to managing operational risk. We study comparatively for a banking society the capital charge for covering the operational risk under the basic indicator approach and under the standardized approach. We present a case study of implementing current capital requirements at the level of a Romanian banking society. From the theoretical approach and from the description of quantifying of operational banking risk, the results of this study insist on the importance of measuring of operational banking risk and identifies major issues that need to be considered to improve the managing operational banking risk.

  16. Managing risk in statistics - "Relative risk" | Durrheim | South African ...

    African Journals Online (AJOL)

    South African Family Practice. Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 45, No 8 (2003) >. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register. Managing risk in statistics - "Relative risk". DN Durrheim ...

  17. "Near-term" Natural Catastrophe Risk Management and Risk Hedging in a Changing Climate

    Science.gov (United States)

    Michel, Gero; Tiampo, Kristy

    2014-05-01

    Competing with analytics - Can the insurance market take advantage of seasonal or "near-term" forecasting and temporal changes in risk? Natural perils (re)insurance has been based on models following climatology i.e. the long-term "historical" average. This is opposed to considering the "near-term" and forecasting hazard and risk for the seasons or years to come. Variability and short-term changes in risk are deemed abundant for almost all perils. In addition to hydrometeorological perils whose changes are vastly discussed, earthquake activity might also change over various time-scales affected by earlier local (or even global) events, regional changes in the distribution of stresses and strains and more. Only recently has insurance risk modeling of (stochastic) hurricane-years or extratropical-storm-years started considering our ability to forecast climate variability herewith taking advantage of apparent correlations between climate indicators and the activity of storm events. Once some of these "near-term measures" were in the market, rating agencies and regulators swiftly adopted these concepts demanding companies to deploy a selection of more conservative "time-dependent" models. This was despite the fact that the ultimate effect of some of these measures on insurance risk was not well understood. Apparent short-term success over the last years in near-term seasonal hurricane forecasting was brought to a halt in 2013 when these models failed to forecast the exceptional shortage of hurricanes herewith contradicting an active-year forecast. The focus of earthquake forecasting has in addition been mostly on high rather than low temporal and regional activity despite the fact that avoiding losses does not by itself create a product. This presentation sheds light on new risk management concepts for over-regional and global (re)insurance portfolios that take advantage of forecasting changes in risk. The presentation focuses on the "upside" and on new opportunities

  18. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  19. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  20. COMPUTERIZED MODEL OF RISK MANAGEMENT IN BUSINESS

    Directory of Open Access Journals (Sweden)

    Petrişor MANDU

    2011-01-01

    Full Text Available The occurrence of risk situation and the manager’s awareness of it are serious threats for the organization and its objectives. Consequently, the manager has to have available, analyze, select and interpret many pieces of information, under stress, before making a decision for avoiding a disaster. Under these circumstances, a computerized model of risk management is the most adequate solution to make the intervention possibilities effective through a quicker and more accurate intervention. The model offers enough confidence and a favorable psychological state for managing risk. In accordance with this model, the risk manager processes the information by means of some operational (mathematical methods and that favors reaching optimum solutions in the shortest delay, based on some estimated anticipations through a rational model.

  1. [Risk management from the judicial perspective].

    Science.gov (United States)

    Ulsenheimer, Klaus

    2003-11-01

    The jurisdification of medicine is an unstoppable force that finds its visible expression in a medical liability boom which--apart from the negative impact of legal and out-of-court proceedings on the bond of the doctor-patient relationship--bears considerable economic disadvantages for the providers of care. It is therefore necessary to fight in particular the legally influenced causes of medical liability for which risk management seems to be a suitable, effective tool. As the examples taken from the jurisdiction in the organisational sector will demonstrate, risk management pinpoints the sources of trouble so that we are able to learn from current errors and provide appropriate remedies for the future. Risk management, though, is not a "unique event", but a dynamic, repetitive process that has to be institutionally secured by appointing a risk manager so that the proposals discussed, recommendations and essential measures can actually be implemented.

  2. Small Business and the Risk Management Program

    Science.gov (United States)

    This factsheet helps small businesses comply with the regulation requiring companies that use regulated substances, hazardous chemical such as ammonia and chlorine, to develop a risk management plan, to help prevent accidental toxic or flammable releases.

  3. Roadway related tort liability and risk management.

    Science.gov (United States)

    2010-06-01

    This workbook provide government employees background information related to tort liability and risk management. Past experience with lawsuits against government entities are summarized. The reasons for the lawsuits and results are analyzed. The obje...

  4. Wildfire Risk Management: Challenges and Opportunities

    Science.gov (United States)

    Thompson, M.; Calkin, D. E.; Hand, M. S.; Kreitler, J.

    2014-12-01

    In this presentation we address federal wildfire risk management largely through the lens of economics, targeting questions related to costs, effectiveness, efficiency, and tradeoffs. Beyond risks to resources and assets such as wildlife habitat, watersheds, and homes, wildfires present financial risk and budgetary instability for federal wildfire management agencies due to highly variable annual suppression costs. Despite its variability, the costs of wildfire management have continued to escalate and account for an ever-growing share of overall agency budgets, compromising abilities to attain other objectives related to forest health, recreation, timber management, etc. Trends associated with a changing climate and human expansion into fire-prone areas could lead to additional suppression costs in the future, only further highlighting the need for an ability to evaluate economic tradeoffs in investments across the wildfire management spectrum. Critically, these economic analyses need to accurately capture the complex spatial and stochastic aspects of wildfire, the inherent uncertainty associated with monetizing environmental impacts of wildfire, the costs and effectiveness of alternative management policies, and linkages between pre-fire investments and active incident management. Investing in hazardous fuels reduction and forest restoration in particular is a major policy lever for pre-fire risk mitigation, and will be a primary focus of our presentation. Evaluating alternative fuel management and suppression policies could provide opportunities for significant efficiency improvements in the development of risk-informed management fire management strategies. Better understanding tradeoffs of fire impacts and costs can help inform policy questions such as how much of the landscape to treat and how to balance investments in treating new areas versus maintaining previous investments. We will summarize current data needs, knowledge gaps, and other factors

  5. Proactive vs. reactive learning on buildings response and earthquake risks, in schools of Romania

    Directory of Open Access Journals (Sweden)

    Daniela DOBRE

    2015-07-01

    Full Text Available During the last 20 years, many specific activities of earthquake education and preparedness were initiated and supported in Romania by drafting materials for citizens, students, professors etc. (Georgescu et al., 2004, 2006. The education, training and information on earthquake disaster potential are important factors to mitigate the earthquake effects. Such activities, however, need time to be developed and may take different forms of presentation in order to capture the attention, to increase interest, to develop skills and attitudes in order to induce a proper behavior towards safety preparedness. It shall also be based on the accumulation of concerns and knowledge, which are, in principle, a consequence of the motivation, but which depend on the methods applied and actions taken for efficient earthquake preparedness, assessed and updated following actual earthquakes (Masuda, Midorikawa, Miki and Ohmachi, 1988. We are now at a crossroad and the proactive attitude and behavior (anticipative and participative needs to be extended in learning, within institutional framework, but correlated with the usual targets of schools and teenagers proactive issue (ROEDUSEIS-NET; Page and Page, 2003, by encouraging students in activities closer to earthquake engineering.

  6. RISK MANAGEMENT IN THE ELECTRONIC BUSINESS

    Directory of Open Access Journals (Sweden)

    Georgeta Soava

    2016-12-01

    Full Text Available Risk should not be understood as a destructive phenomenon, but bear in mind that managers who know how to use it can lead to real opportunities. Manager must first recognize the existence of risk, namely to identify and then use specific methods to avoid or reduce the risk. The purpose of this paper is to enter the world, at all simple, of risk management, relatively easy concept to understand but not so easy to put into practice. Of course, the approach relates primarily at the risks inherent of the business in digital environments, but they not represent only a particular case of the risks they are exposed, in general, the companies. In the paper we put in evidence the significance in general business, risks in e-business, then we added a description of the types of security risks, an exemplification of these and a series of test scenarios, and finally to make a analysis of operational solutions of risk management

  7. Radiation risk management at DOE accelerator facilities

    International Nuclear Information System (INIS)

    Dyck, O.B. van.

    1997-01-01

    The DOE accelerator contractors have been discussing among themselves and with the Department how to improve radiation safety risk management. This activity-how to assure prevention of unplanned high exposures-is separate from normal exposure management, which historically has been quite successful. The ad-hoc Committee on the Accelerator Safety Order and Guidance [CASOG], formed by the Accelerator Section of the HPS, has proposed a risk- based approach, which will be discussed. Concepts involved are risk quantification and comparison (including with non-radiation risk), passive and active (reacting) protection systems, and probabilistic analysis. Different models of risk management will be presented, and the changing regulatory environment will also be discussed

  8. Decision support for utility environmental risk management

    International Nuclear Information System (INIS)

    Balson, W.E.; Wilson, D.S.

    1991-01-01

    This paper reviews a number of decision support methods developed and applied by Decision Focus Incorporated to help utility personnel manage current environmental problems. This work has been performed for the Environmental Risk Analysis Program of EPRI's Environment Division, and also for a number of electric utilities across the country. These are two distinct types of decision support software tools that have been created: economic risk management and environmental risk analysis. These types differ primarily in the identification of who will make a decision. Economic risk management tools are directed primarily at decisions made by electric utilities. Environmental risk analysis tools are directed primarily at decisions made by legislative or regulatory agencies, about which a utility may wish to comment

  9. COMPUTERIZED MODEL OF RISK MANAGEMENT IN BUSINESS

    OpenAIRE

    Petrişor MANDU

    2011-01-01

    The occurrence of risk situation and the manager’s awareness of it are serious threats for the organization and its objectives. Consequently, the manager has to have available, analyze, select and interpret many pieces of information, under stress, before making a decision for avoiding a disaster. Under these circumstances, a computerized model of risk management is the most adequate solution to make the intervention possibilities effective through a quicker and more accurate intervention. Th...

  10. Fundamentals of risk management understanding, evaluating and implementing effective risk management

    CERN Document Server

    Hopkin, Paul

    2012-01-01

    Now more than ever, organizations must plan, response and recognize all forms of risks that they face. "Fundamentals of Risk Management", now in its second edition, provides a comprehensive introduction to the subject of commercial and business risk for anyone studying for a career in risk as well as a broad range of risk professionals. It examines the key components of risk management and its application with examples to demonstrate its benefit to organisations in the public and private sector. The second edition has been completely updated to take into account the greater influence of ISO 3100, the emergence of Governance Risk and Compliance (GRC) and the wide use of the bowtie method to illustrate risk management. In addition, there is now a chapter on the skills and competencies required by an effective risk manager.

  11. Earthquake Risk Analysis and Science for Peace in Western/ Kashmir Himalayas - A Road Map for Transnational Subsurface Earth Imaging

    Science.gov (United States)

    Tandon, K.

    2006-12-01

    In light of immense human tragedy caused by the Kashmir earthquake of October 8, 2005, there is a need for transnational science for the assessment of future earthquake risks and understanding continental dynamics within the Western and Kashmir Himalayas. One can approach such a test to our society through understanding what causes these earthquakes in Kashmir in the first place in a rigorous manner and also try to determine how often do they happen in Western/ Kashmir Himalayas. Geophysical measurements (passive source, active source seismology, magnetotelluric measurements, Ground Penetrating Radar (GPR)) are imaging techniques for earth's deeper as well as shallow structure. When such imaging techniques are used on scales of earth's crust and beyond (~30 km to 100 km) and also on near the surface (~10 to100 meters) of the earth, it helps us understand both the processes for the origin and frequency of the earthquakes. Here, I will only concentrate on a road map for planning regional reflection seismology (active source seismology) surveys within the context of National Science Foundation (NSF) led Science for Peace Initiative primarily involving USA, India, and Pakistan. The proposal here is to initiate shallow and deep active source surveys in mega-population cities in Punjab and adjoining areas in Western Himalayas on either side of the political boundaries of India and Pakistan as separate ventures for first few years but a start for future collaboration. Once the core scientific teams are formed involving Indian, Pakistani, American, and scientists from other nations too, then the Indus Kohistan Seismic Zone in the Kashmir Himalayas should be the target for detailed geophysical and geological investigations. The idea presented here was first formed for the NSF sponsored International Karakoram-Kashmir Workshop that was supposed to be held in Islamabad (Pakistan), May 2006 with around 100 invitees from 10 nations for forming joint scientific initiatives

  12. Integrative analysis and discoveries of Yellowstone science revealing new interpretations and assessments of earthquake and volcano risk

    Science.gov (United States)

    Smith, R. B.; Farrell, J.; Massin, F.; Puskas, C. M.; Chang, W.; Shelly, D. R.

    2013-12-01

    post-earthquake seismic stress contagion that will persist for tens to hundreds of years after the triggering event. In contrast, caldera seismicity reflects regional NE-SW extension of up to 5 mm/yr, one-fourth of the total extension of the entire Basin Range, with superposed localized and episodic stresses associated with magmatic/hydrothermal injection, migration, deflation, processes; 5) the largest Yellowstone earthquake swarms are shown to initiate coincident with caldera deformation reversal from uplift to subsidence based on GPS measurements, reflecting the lateral release of magmatic fluids migrating out of the magma reservoir. We hypothesize this process is a 'pressure relief valve' maintaining an equilibrium flux of magmatic fluids into and out of the crustal magma reservoir where every 20,000 years or so it erupts into rhyolite/basalt flows and every ~700,000 years leads into a supervolcano eruption; and 6) Our new hazard assessment of Yellowstone shows that the biggest geologic hazard and risk is from large earthquakes, not from volcanic eruptions, contrary to what has been commonly thought and communicated to the public.

  13. FPSPACK: a package of FORTRAN subroutines to manage earthquake focal mechanism data

    Science.gov (United States)

    Gasperini, Paolo; Vannucci, Gianfranco

    2003-08-01

    Earthquakes fault plane solutions (FPSs) are routinely computed on the basis of various techniques and are reported in the literature with a wide range of formats and conventions. Although the equations relating the various parameters are well known and relatively simple, their practical application often arise to numerical singularities and indeterminations that sometimes are not well known by the authors and thus may result in wrong or inaccurate reporting of parameters. Such inaccuracies and mistakes affect about 40% of the published data we have examined to test our programs. Moreover the current use, in the seismological community, of at least two different coordinate systems to represent the Cartesian components of vectorial and tensorial quantities is a further cause of confusion. In order to simplify the management of such data, we have prepared a structured package of FORTRAN 77 subroutines performing almost all of the possible computations and conversions among different parameters and coordinate systems. The package has been extensively tested with the data of a revised database of FPS of Italy and surrounding regions (presented in a companion paper) as well as of CMT solutions included in the Harvard catalog.

  14. Risk management in waste water treatment.

    Science.gov (United States)

    Wagner, M; Strube, I

    2005-01-01

    With the continuous restructuring of the water market due to liberalisation, privatisation and internationalisation processes, the requirements on waste water disposal companies have grown. Increasing competition requires a target-oriented and clearly structured procedure. At the same time it is necessary to meet the environment-relevant legal requirements and to design the processes to be environment-oriented. The implementation of risk management and the integration of such a management instrument in an existing system in addition to the use of modern technologies and procedures can help to make the operation of the waste water treatment safer and consequently strengthen market position. The risk management process consists of three phases, risk identification, risk analysis/risk assessment and risk handling, which are based on each other, as well as of the risk managing. To achieve an identification of the risks as complete as possible, a subdivision of the kind of risks (e.g. legal, financial, market, operational) is suggested. One possibility to assess risks is the portfolio method which offers clear representation. It allows a division of the risks into classes showing which areas need handling. The determination of the appropriate measures to handle a risk (e.g. avoidance, reduction, shift) is included in the concluding third phase. Different strategies can be applied here. On the one hand, the cause-oriented strategy, aiming at preventive measures which aim to reduce the probability of occurrence of a risk (e.g. creation of redundancy, systems with low susceptibility to malfunction). On the other hand, the effect-oriented strategy, aiming to minimise the level of damage in case of an undesired occurrence (e.g. use of alarm systems, insurance cover).

  15. Aligning records management and risk management with business ...

    African Journals Online (AJOL)

    This paper is a synopsis of the preliminary findings of a Master of Philosophy Degree in In-formation Sciences which sought to investigate the alignment of risk management and re-cords management with business processes in Moi University with a view to proposing a strategy to enhance business performance. The study ...

  16. Management of interest rate risk

    Directory of Open Access Journals (Sweden)

    Šabović Šerif

    2014-01-01

    Full Text Available Interest rate risk is one of the biggest and most dangerous risks that a bank is exposed to. When a change of interest rates occurs, the incomes of a bank based on credits and securities endure significant changes. Banks resources also endure some changes. The change of interest rates changes the value of the assets and liabilities of the bank and it's net and investment worth . The change of interest rates also affects bank's balance sheet, income sheet statement and bank's share capital.

  17. Self-management of vascular risk factors

    NARCIS (Netherlands)

    Sol-de Rijk, B.G.M.

    2009-01-01

    Summary The aim of this thesis was to provide insight into the potential of a self-management approach in treatment of vascular risk factors and to develop a self-management intervention. Furthermore to examine if this intervention, based on self-efficacy promoting theory, is effective in reducing

  18. Research Award: Risk Management and Internal Audit

    International Development Research Centre (IDRC) Digital Library (Canada)

    Corey Piccioni

    2013-08-07

    Aug 7, 2013 ... manage research; and. • idenfying competencies, key success factors or performance indicators most crical to research instuons. In addion to their research project, the RMIA Research Awardee will be involved in a range of acvies to contribute to the ongoing program of risk management and internal audit ...

  19. Risk management and oil trading contracts

    International Nuclear Information System (INIS)

    Sas, B.

    1992-01-01

    The oil market provides an excellent case study for an analysis of the commodity trading risks and the development of contractual instruments and market structures to meet these risks. The paper identifies the main risks, namely performance, credit/payment, price, regulatory, fiscal, and ''trading'' risk. A conceptual framework provides the basis to trace the evolution of the risk management instruments from relational (e.g. long-term), through ''transactional'' (e.g. spot and forwards) to ''institutional'' (e.g. futures and options) and finally ''pricing'' (e.g. swaps and trigger pricing) contracts. (author)

  20. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, Jeffrey H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2010-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  1. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, J.H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2009-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project

  2. A Risk Management Process for Consumers

    NARCIS (Netherlands)

    van Cleeff, A.

    2010-01-01

    Simply by using information technology, consumers expose themselves to considerable security risks. Because no technical or legal solutions are readily available, the only remedy is to develop a risk management process for consumers, similar to the process executed by enterprises. Consumers need to

  3. Board of directors and risk management

    NARCIS (Netherlands)

    van der Elst, C.F.; Birkmose, H.; Neville, M.; Sorensen, K.

    2013-01-01

    The board of directors is responsible for an appropriate business risk management environment. The paper studies in a comparative way how legislators and courts fill this duty. We question whether the legislative and regulatory framework will improve the equilibrium between entrepreneurship and risk

  4. Risk management, derivatives and shariah compliance

    Science.gov (United States)

    Bacha, Obiyathulla Ismath

    2013-04-01

    Despite the impressive growth of Islamic Banking and Finance (IBF), a number of weaknesses remain. The most important of this is perhaps the lack of shariah compliant risk management tools. While the risk sharing philosophy of Islamic Finance requires the acceptance of risk to justify returns, the shariah also requires adherents to avoid unnecessary risk-maysir. The requirement to avoid maysir is in essence a call for the prudent management of risk. Contemporary risk management revolves around financial engineering, the building blocks of which are financial derivatives. Despite the proven efficacy of derivatives in the management of risk in the conventional space, shariah scholars appear to be suspicious and uneasy with their use in IBF. Some have imposed outright prohibition of their use. This paper re-examines the issue of contemporary derivative instruments and shariah compliance. The shariah compatibility of derivatives is shown in a number of ways. First, by way of qualitative evaluation of whether derivatives can be made to comply with the key prohibitions of the sharia. Second, by way of comparing the payoff profiles of derivatives with risk sharing finance and Bai Salam contracts. Finally, the equivalence between shariah compliant derivatives like the IPRS and Islamic FX Currency Forwards with conventional ones is presented.

  5. The NASA Continuous Risk Management Process

    Science.gov (United States)

    Pokorny, Frank M.

    2004-01-01

    As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics

  6. Methodology of environmental risk assessment management

    Directory of Open Access Journals (Sweden)

    Saša T. Bakrač

    2012-04-01

    Full Text Available Successful protection of environment is mostly based on high-quality assessment of potential and present risks. Environmental risk management is a complex process which includes: identification, assessment and control of risk, namely taking measures in order to minimize the risk to an acceptable level. Environmental risk management methodology: In addition to these phases in the management of environmental risk, appropriate measures that affect the reduction of risk occurrence should be implemented: - normative and legal regulations (laws and regulations, - appropriate organizational structures in society, and - establishing quality monitoring of environment. The emphasis is placed on the application of assessment methodologies (three-model concept, as the most important aspect of successful management of environmental risk. Risk assessment methodology - European concept: The first concept of ecological risk assessment methodology is based on the so-called European model-concept. In order to better understand this ecological risk assessment methodology, two concepts - hazard and risk - are introduced. The European concept of environmental risk assessment has the following phases in its implementation: identification of hazard (danger, identification of consequences (if there is hazard, estimate of the scale of consequences, estimate of consequence probability and risk assessment (also called risk characterization. The European concept is often used to assess risk in the environment as a model for addressing the distribution of stressors along the source - path - receptor line. Risk assessment methodology - Canadian concept: The second concept of the methodology of environmental risk assessment is based on the so-called Canadian model-concept. The assessment of ecological risk includes risk arising from natural events (floods, extreme weather conditions, etc., technological processes and products, agents (chemical, biological, radiological, etc

  7. Interplanetary Supply Chain Risk Management

    Science.gov (United States)

    Galluzzi, Michael C.

    2018-01-01

    Emphasis on KSC ground processing operations, reduced spares up-mass lift requirements and campaign-level flexible path perspective for space systems support as Regolith-based ISM is achieved by; Network modeling for sequencing space logistics and in-space logistics nodal positioning to include feedstock. Economic modeling to assess ISM 3D printing adaption and supply chain risk.

  8. Offshore Earthquakes Do Not Influence Marine Mammal Stranding Risk on the Washington and Oregon Coasts

    Science.gov (United States)

    Grant, Rachel A.; Savirina, Anna

    2018-01-01

    Simple Summary Marine mammals stranding on coastal beaches is not unusual. However, there appears to be no single cause for this, with several causes being probable, such as starvation, contact with humans (for example boat strike or entanglement with fishing gear), disease, and parasitism. We evaluated marine mammal stranding off the Washington and Oregon coasts and looked at offshore earthquakes as a possible contributing factor. Our analysis showed that offshore earthquakes did not make marine mammals more likely to strand. We also analysed a subset of data from the north of Washington State and found that non-adult animals made up a large proportion of stranded animals, and for dead animals the commonest cause of death was disease, traumatic injury, or starvation. Abstract The causes of marine mammals stranding on coastal beaches are not well understood, but may relate to topography, currents, wind, water temperature, disease, toxic algal blooms, and anthropogenic activity. Offshore earthquakes are a source of intense sound and disturbance and could be a contributing factor to stranding probability. We tested the hypothesis that the probability of marine mammal stranding events on the coasts of Washington and Oregon, USA is increased by the occurrence of offshore earthquakes in the nearby Cascadia subduction zone. The analysis carried out here indicated that earthquakes are at most, a very minor predictor of either single, or large (six or more animals) stranding events, at least for the study period and location. We also tested whether earthquakes inhibit stranding and again, there was no link. Although we did not find a substantial association of earthquakes with strandings in this study, it is likely that there are many factors influencing stranding of marine mammals and a single cause is unlikely to be responsible. Analysis of a subset of data for which detailed descriptions were available showed that most live stranded animals were pups, calves, or

  9. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  10. Information needs for risk management/communication

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, D.A. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31

    The hazardous waste cleanup program under the Comprehensive Environmental Response, Compensation, and Liability Act (Superfund) is delegated to the ten Regions of the US Environmental Protection Agency (EPA) and has, to date, identified more than 33,000 sites for consideration. The size and complexity of the program places great demands on those who would provide information to achieve national consistency in application of risk assessment while meeting site-specific needs for risk management and risk communication.

  11. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  12. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  13. THRMS: A pilot risk management system

    International Nuclear Information System (INIS)

    Xue, D.; Xu, Y.

    2000-01-01

    Daya Bay NPP is the first commercial nuclear power plant in China. This plant is interested in and pro-active towards the development and application of PSA and PSA tools. This, together with the support from the IAEA promoted the project 'THRMS: the pilot study of risk management system for NPP'. The objectives in development and implementation of THRMS includes: survey and discuss on the development of the approaches used in constructing plant risk models; design and study on the realization of a real-time risk management system. An overview of the project is presented in this paper. (author)

  14. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  15. Risk management - unappreciated instrument of supply chain management strategy

    Directory of Open Access Journals (Sweden)

    Wojciech Machowiak

    2012-12-01

    Full Text Available Background: Unlike Enterprise Risk Management, which is certainly quite well rooted in business practice, Supply Chain Risk Management (SCRM still continues to be dynamically developing subject of academic research, whereas its practical applications are rather scarce. Material and methods: On the basis of broad review of the current state of the art in world literature, significant  relevancies to the core processes and enterprise strategy are discussed.   Results: The paper shows some interesting from the enterprise's performance and competitiveness point of view additional benefits, potentially resulting from the proactive, consistent and effective implementation of the SCRM system. Conclusions: Some additional advantages from proactive supply chain risk management account for perceiving SCRM as multifunctional instrument of strategic SC management, exceeding established understanding RM as security and threat-prevention  tool only. Positive influence from SCRM onto SC performance and competitiveness can make reasonable to enhance its position within SCM strategy.

  16. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    Science.gov (United States)

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  17. Managing the microbiological risks of drinking water.

    Science.gov (United States)

    Krewski, Daniel; Balbus, John; Butler-Jones, David; Haas, Charles; Isaac-Renton, Judith; Roberts, Kenneth; Sinclair, Martha

    The microbiological contamination of drinking water supplies can have serious health consequences for consumers, and this has been dramatically illustrated in recent years by two disease outbreaks in Canada. In this paper, some factors that can influence the microbiological quality of drinking water and its management are examined. Frameworks have been proposed that help to clarify the main elements of health risk assessment and risk management, and, in accordance with these, risks can be logically characterized, evaluated and controlled. A protocol has been developed for microbiological risk assessment and a risk management framework now guides the development of Canada's national guidelines for drinking-water quality. Monitoring of indicator organisms and the application of adequate water treatment are the primary means recommended in the Canadian guidelines to safeguard health from the presence of water-borne pathogens. Understanding the biological characteristics of microbial pathogens is necessary for assessing their impact on community health and appraising the rationale behind drinking-water testing methods and their limitations. Improvements in health surveillance, monitoring, and risk characterization and application of concepts such as multiple barriers (source-to-tap) and total quality management should contribute to better management of the microbiological quality of drinking water.

  18. Effects of catastrophic events on transportation system management and operations : Northridge earthquake -- January 17, 1994

    Science.gov (United States)

    2002-04-22

    This report documents the actions taken by transportation agencies in response to the earthquake in Northridge, California on January 17, 1994, and is part of a larger effort to examine the impacts of catastrophic events on transportation system faci...

  19. Offshore Earthquakes Do Not Influence Marine Mammal Stranding Risk on the Washington and Oregon Coasts.

    Science.gov (United States)

    Grant, Rachel A; Savirina, Anna; Hoppitt, Will

    2018-01-26

    The causes of marine mammals stranding on coastal beaches are not well understood, but may relate to topography, currents, wind, water temperature, disease, toxic algal blooms, and anthropogenic activity. Offshore earthquakes are a source of intense sound and disturbance and could be a contributing factor to stranding probability. We tested the hypothesis that the probability of marine mammal stranding events on the coasts of Washington and Oregon, USA is increased by the occurrence of offshore earthquakes in the nearby Cascadia subduction zone. The analysis carried out here indicated that earthquakes are at most, a very minor predictor of either single, or large (six or more animals) stranding events, at least for the study period and location. We also tested whether earthquakes inhibit stranding and again, there was no link. Although we did not find a substantial association of earthquakes with strandings in this study, it is likely that there are many factors influencing stranding of marine mammals and a single cause is unlikely to be responsible. Analysis of a subset of data for which detailed descriptions were available showed that most live stranded animals were pups, calves, or juveniles, and in the case of dead stranded mammals, the commonest cause of death was trauma, disease, and emaciation.

  20. Health Status and Risk Factors among Adolescent Survivors One Month after the 2014 Ludian Earthquake

    Directory of Open Access Journals (Sweden)

    Bihan Tang

    2015-06-01

    Full Text Available Background: An earthquake struck Ludian in Yunnan Province (China on 3 August 2014, resulting in 3143 injuries, 617 deaths, and 112 missing persons. Our study aimed at estimating the health status and associated determinants among adolescent survivors after the Ludian earthquake. Methods: A cross-sectional survey of 845 was conducted at the Ludian No. 1 Middle School. Descriptive statistics, t-tests, ANOVA and stepwise linear regression analysis were used for data analysis. Results: The mean scores on the physical component summary (PCS and mental component summary (MCS were 46.23 (SD = 7.10 and 36.34 (SD = 7.09, respectively. Lower PCS scores in the aftermath of an earthquake were associated with being trapped or in danger, being female, being an ethnic minority, injury to self and house damage, while lower MSC scores were associated with fear during the earthquake, Han ethnicity, death in the family, not being involved in the rescue and low household income. Conclusions: In our study, significant associations between demographic, socio-economic, and trauma-related experiences variables and overall physical and mental health of adolescent survivors were presented. The results of this study help expand our knowledge of health status among adolescent survivors after the Ludian earthquake.

  1. Offshore Earthquakes Do Not Influence Marine Mammal Stranding Risk on the Washington and Oregon Coasts

    Directory of Open Access Journals (Sweden)

    Rachel A. Grant

    2018-01-01

    Full Text Available The causes of marine mammals stranding on coastal beaches are not well understood, but may relate to topography, currents, wind, water temperature, disease, toxic algal blooms, and anthropogenic activity. Offshore earthquakes are a source of intense sound and disturbance and could be a contributing factor to stranding probability. We tested the hypothesis that the probability of marine mammal stranding events on the coasts of Washington and Oregon, USA is increased by the occurrence of offshore earthquakes in the nearby Cascadia subduction zone. The analysis carried out here indicated that earthquakes are at most, a very minor predictor of either single, or large (six or more animals stranding events, at least for the study period and location. We also tested whether earthquakes inhibit stranding and again, there was no link. Although we did not find a substantial association of earthquakes with strandings in this study, it is likely that there are many factors influencing stranding of marine mammals and a single cause is unlikely to be responsible. Analysis of a subset of data for which detailed descriptions were available showed that most live stranded animals were pups, calves, or juveniles, and in the case of dead stranded mammals, the commonest cause of death was trauma, disease, and emaciation.

  2. Living with risk: a management question

    International Nuclear Information System (INIS)

    Ale, Ben J.M.

    2005-01-01

    Public authorities started to be really involved in risk management of hazardous materials some 30 years ago. Recent developments have led to fresh attention for this matter and many further developments are underway. The history of risk management and safety regulation is one of strongly variable interest, forgotten lessons and rude awakenings. The impetus exerted by accidents is short lived. Safety cases become documents to satisfy regulation rather than instruments to reduce risk. Deregulation, privatisation, and outsourcing pose new challenges to safety and risk management. Some of the unfortunate side effects have already become apparent. This invariably leads to the next disaster, which will have a striking resemblance to the previous one when abstracted from the immediate technological context. Lessons can be learned if we really want. The question remains: 'Do we?'

  3. Operational risk management for a NPP

    Energy Technology Data Exchange (ETDEWEB)

    Scott, C.K., E-mail: KScott@AtlanticNuclear.ca [Atlantic Nuclear Services Inc., Fredericton, New Brunswick (Canada)

    2013-07-01

    Organizational failures are a hazard to the successful operation of a nuclear power plant. Risk reduction strategies have been developed around two themes: using an understanding of the nature and mechanism of human failures to eliminate them by modifying work processes; or, modifying human behaviour by creating a strong safety culture that overrides the tendency to fail. This paper examines the problem from the perspective of operational risk management. It includes the internal management of operations and the influence of the external environment on the organization. A model is proposed that encompasses all the operational risk factors in the organization's decision making process. To prevent failure the organization must have the capability to adapt and the capacity to evolve. The hazards that would lead to an organizational failure are developed from this evolutionary model. The operational risk management program would include these hazards as well as the conventional nuclear safety hazards. (author)

  4. Operational risk management for a NPP

    International Nuclear Information System (INIS)

    Scott, C.K.

    2013-01-01

    Organizational failures are a hazard to the successful operation of a nuclear power plant. Risk reduction strategies have been developed around two themes: using an understanding of the nature and mechanism of human failures to eliminate them by modifying work processes; or, modifying human behaviour by creating a strong safety culture that overrides the tendency to fail. This paper examines the problem from the perspective of operational risk management. It includes the internal management of operations and the influence of the external environment on the organization. A model is proposed that encompasses all the operational risk factors in the organization's decision making process. To prevent failure the organization must have the capability to adapt and the capacity to evolve. The hazards that would lead to an organizational failure are developed from this evolutionary model. The operational risk management program would include these hazards as well as the conventional nuclear safety hazards. (author)

  5. Probability distributions in risk management operations

    CERN Document Server

    Artikis, Constantinos

    2015-01-01

    This book is about the formulations, theoretical investigations, and practical applications of new stochastic models for fundamental concepts and operations of the discipline of risk management. It also examines how these models can be useful in the descriptions, measurements, evaluations, and treatments of risks threatening various modern organizations. Moreover, the book makes clear that such stochastic models constitute very strong analytical tools which substantially facilitate strategic thinking and strategic decision making in many significant areas of risk management. In particular the incorporation of fundamental probabilistic concepts such as the sum, minimum, and maximum of a random number of continuous, positive, independent, and identically distributed random variables in the mathematical structure of stochastic models significantly supports the suitability of these models in the developments, investigations, selections, and implementations of proactive and reactive risk management operations. The...

  6. The role of risk perception for risk management

    International Nuclear Information System (INIS)

    Renn, Ortwin

    1998-01-01

    Are risks social constructions of different societal actors that can be checked at best against standards of consistency, cohesion and internal conventions of deduction, but cannot claim any validity outside of the actor's logical framework? Or are technical estimates of risk representations of real hazards that can and will affect people as predicted by the statistical values, regardless of the beliefs or convictions of those who conduct the assessments? Which of the two sides one takes determines the legitimate function of risk perception for management purposes. The paper argues that both extremes, the constructivist and the realist perspective, miss the point, as risks are always mental representations of threats that are capable of claiming real losses. Over the last two decades, risk analysts have dealt with both sides of risk in an additive fashion. In times in which risk management has been under serious pressure to demonstrate effectiveness and cost-efficiency, the parallel approach of pleasing the technical elite and the public alike has lost legitimacy. In order to integrate risk assessment and perception, the paper analyses the strengths and weaknesses of each approach to risk analysis and highlights the potential contributions that the technical sciences and the social sciences can offer to risk management. Technical assessments provide the best estimate for judging the average probability of an adverse effect linked to an object or activity. First, public perception should govern the selection of criteria on which acceptability or tolerability are to be judged. Second, public input is needed to determine the trade-offs between criteria. Third, public preferences are needed to design resilient strategies for coping with remaining uncertainties. A public participation model is introduced that promises an integration of analytic knowledge and deliberative process involving those who will be affected by the respective risk

  7. Risk management in a university environment.

    Science.gov (United States)

    Brewer, Ann; Walker, Ian

    2011-06-01

    Risk is an integral part of quality assurance in higher education in Australia. This paper describes a generic methodology for the identification and management of risk in a university or similar tertiary education environment and outlines a framework that enables the management of risk to be incorporated in the institution's governance cycle. The new approach here is that risk is embedded in the quality assurance framework and, in turn, in the strategic planning and budgeting processes. In many organisations, risk is implemented as a separate process and not considered in any meaningful way as integral to the strategic direction and performance of the university. The paper is based on work carried out by the authors and others between March 2008 and April 2009 to develop a comprehensive system for managing risk in a major Australian university, including processes whereby risk management could be integrated with, and add value to, the overall governance of the university. The case study is described in the appendix to this paper.

  8. The Role of risk perception for risk management

    International Nuclear Information System (INIS)

    Renn, Ortwin

    1999-01-01

    The list of individual and social factors that shape risk perception demonstrates that the intuitive understanding of risk is a multidimensional concept and cannot be reduced to the product of probabilities and consequences. Although risk perceptions differ considerably among social and cultural groups, the multi-dimensionality of risk and the integration of beliefs related to risk, the cause of risk, and its circumstances into a consistent belief system appear to be common characteristics of public risk perception in almost all countries in which such studies have been performed. Furthermore, the experience of risk is not limited to the threat of facing harm in the future. It includes subjective predictions of possible outcomes, the social and cultural context in which the risk is experienced, the mental images the risk situation evokes, the perception of the players who are involved in the risk situation and the judgments about fairness and equity related to the distribution of potential hazardous events. In this sense, risk is a social construct rather than a physical entity. Risk communication and conflict resolution is therefore a crucial element of any risk management strategy. The goal of risk communication and conflict resolution should not be to persuade people to accept whatever the communicator thinks is best for them. The ideal communication program envisions a receiver who processes all the available information to form a well-balanced judgement in accordance with the factual evidence, the arguments of all sides, and his/her own interests and preferences. The ultimate goal of risk communication is to reconcile expertise, interests, and public preferences. (EHS)

  9. Desertification risk assessment and management program

    Directory of Open Access Journals (Sweden)

    M. Akbari

    2016-12-01

    Full Text Available Risk assessment provides the possibility of planning and management to prevent and reduce the risk of desertification. The present study is aimed to assess the hazard and risk of desertification and to develop management programs in the semi-arid western regions of Golestan Province in Iran. Desertification rate was obtained using the Iranian model of desertification potential assessment. Since the rating system was considered for the indicators, data analyses were carried out according to the Mann-Whitney test. The risk of desertification was calculated based on hazard, elements at risk and vulnerability assessment maps. The intensity of desertification was estimated to be medium. Among the factors affecting desertification, agriculture by the weighted average of 3.22 had the highest effect, followed by soil, vegetation, water and wind erosion criteria by weighted averages of 2.45, 2.32, 2.15 and 1.6 respectively. Desertification risk assessment results also showed that about 78% of central and northern parts of the region, with the largest population and residential centers, surface and underground water resources, agriculture and horticulture, is confronted with a high to very high degree of risk. Management plans and control measures, based on risk values were presented in four activities (with two management priorities under critical and non-critical conditions. For the management program with the largest area. Control measures and strategies such as the establishment of halophytic and xerophytic plants, drainage networks, resilient facilities and infrastructure were proposed. Reducing the risk of desertification, could play a crucial role in the sustainable development of drylands and desert ecosystems.

  10. The Architecture of Financial Risk Management Systems

    Directory of Open Access Journals (Sweden)

    Iosif ZIMAN

    2013-01-01

    Full Text Available The architecture of systems dedicated to risk management is probably one of the more complex tasks to tackle in the world of finance. Financial risk has been at the center of attention since the explosive growth of financial markets and even more so after the 2008 financial crisis. At multiple levels, financial companies, financial regulatory bodies, governments and cross-national regulatory bodies, all have put the subject of financial risk in particular and the way it is calculated, managed, reported and monitored under intense scrutiny. As a result the technology underpinnings which support the implementation of financial risk systems has evolved considerably and has become one of the most complex areas involving systems and technology in the context of the financial industry. We present the main paradigms, require-ments and design considerations when undertaking the implementation of risk system and give examples of user requirements, sample product coverage and performance parameters.

  11. Managing IT-related operational risks

    Directory of Open Access Journals (Sweden)

    Savić Ana

    2008-01-01

    Full Text Available Not so long ago, information technology (IT risk occupied a small corner of operational risk - the opportunity loss from a missed IT development deadline. Today, the success of an entire financial institution may lay on managing a broad landscape of IT risks. IT risk is a potential damage to an organization's value, resulting from inadequate managing of processes and technologies. IT risk includes the failure to respond to security and privacy requirements, as well as many other issues such as: human error, internal fraud through software manipulation, external fraud by intruders, obsolesce in applications and machines, reliability issues or mismanagement. The World Economic Forum provides best information about this problem. They rank a breakdown of critical information infrastructure among the most likely core global risks, with 10-20 % likelihood over the next 10 years and potential worldwide impact of $250 billion. Sustained investment in IT - almost $1.2 trillion or 29% of 2006 private-sector capital investment in the U.S. alone fuels growing exposure to IT risk. Greg Hughes, chief strategy officer in Symantec Corp. recently claimed "IT risk management is more than using technology to solve security problems. With proper planning and broad support, it can give an organization the confidence to innovate, using IT to outdistance competitors".

  12. Earthquake induced liquefaction hazard, probability and risk assessment in the city of Kolkata, India: its historical perspective and deterministic scenario

    Science.gov (United States)

    Nath, Sankar Kumar; Srivastava, Nishtha; Ghatak, Chitralekha; Adhikari, Manik Das; Ghosh, Ambarish; Sinha Ray, S. P.

    2018-01-01

    Liquefaction-induced ground failure is one amongst the leading causes of infrastructure damage due to the impact of large earthquakes in unconsolidated, non-cohesive, water saturated alluvial terrains. The city of Kolkata is located on the potentially liquefiable alluvial fan deposits of Ganga-Bramhaputra-Meghna Delta system with subsurface litho-stratigraphic sequence comprising of varying percentages of clay, cohesionless silt, sand, and gravel interbedded with decomposed wood and peat. Additionally, the region has moderately shallow groundwater condition especially in the post-monsoon seasons. In view of burgeoning population, there had been unplanned expansion of settlements in the hazardous geological, geomorphological, and hydrological conditions exposing the city to severe liquefaction hazard. The 1897 Shillong and 1934 Bihar-Nepal earthquakes both of M w 8.1 reportedly induced Modified Mercalli Intensity of IV-V and VI-VII respectively in the city reportedly triggering widespread to sporadic liquefaction condition with surface manifestation of sand boils, lateral spreading, ground subsidence, etc., thus posing a strong case for liquefaction potential analysis in the terrain. With the motivation of assessing seismic hazard, vulnerability, and risk of the city of Kolkata through a consorted federal funding stipulated for all the metros and upstart urban centers in India located in BIS seismic zones III, IV, and V with population more than one million, an attempt has been made here to understand the liquefaction susceptibility condition of Kolkata under the impact of earthquake loading employing modern multivariate techniques and also to predict deterministic liquefaction scenario of the city in the event of a probabilistic seismic hazard condition with 10% probability of exceedance in 50 years and a return period of 475 years. We conducted in-depth geophysical and geotechnical investigations in the city encompassing 435 km2 area. The stochastically

  13. Earthquake induced liquefaction hazard, probability and risk assessment in the city of Kolkata, India: its historical perspective and deterministic scenario

    Science.gov (United States)

    Nath, Sankar Kumar; Srivastava, Nishtha; Ghatak, Chitralekha; Adhikari, Manik Das; Ghosh, Ambarish; Sinha Ray, S. P.

    2017-09-01

    Liquefaction-induced ground failure is one amongst the leading causes of infrastructure damage due to the impact of large earthquakes in unconsolidated, non-cohesive, water saturated alluvial terrains. The city of Kolkata is located on the potentially liquefiable alluvial fan deposits of Ganga-Bramhaputra-Meghna Delta system with subsurface litho-stratigraphic sequence comprising of varying percentages of clay, cohesionless silt, sand, and gravel interbedded with decomposed wood and peat. Additionally, the region has moderately shallow groundwater condition especially in the post-monsoon seasons. In view of burgeoning population, there had been unplanned expansion of settlements in the hazardous geological, geomorphological, and hydrological conditions exposing the city to severe liquefaction hazard. The 1897 Shillong and 1934 Bihar-Nepal earthquakes both of M w 8.1 reportedly induced Modified Mercalli Intensity of IV-V and VI-VII respectively in the city reportedly triggering widespread to sporadic liquefaction condition with surface manifestation of sand boils, lateral spreading, ground subsidence, etc., thus posing a strong case for liquefaction potential analysis in the terrain. With the motivation of assessing seismic hazard, vulnerability, and risk of the city of Kolkata through a consorted federal funding stipulated for all the metros and upstart urban centers in India located in BIS seismic zones III, IV, and V with population more than one million, an attempt has been made here to understand the liquefaction susceptibility condition of Kolkata under the impact of earthquake loading employing modern multivariate techniques and also to predict deterministic liquefaction scenario of the city in the event of a probabilistic seismic hazard condition with 10% probability of exceedance in 50 years and a return period of 475 years. We conducted in-depth geophysical and geotechnical investigations in the city encompassing 435 km2 area. The stochastically

  14. FEMA's Earthquake Incident Journal: A Web-Based Data Integration and Decision Support Tool for Emergency Management

    Science.gov (United States)

    Jones, M.; Pitts, R.

    2017-12-01

    For emergency managers, government officials, and others who must respond to rapidly changing natural disasters, timely access to detailed information related to affected terrain, population and infrastructure is critical for planning, response and recovery operations. Accessing, analyzing and disseminating such disparate information in near real-time are critical decision support components. However, finding a way to handle a variety of informative yet complex datasets poses a challenge when preparing for and responding to disasters. Here, we discuss the implementation of a web-based data integration and decision support tool for earthquakes developed by the Federal Emergency Management Agency (FEMA) as a solution to some of these challenges. While earthquakes are among the most well- monitored and measured of natural hazards, the spatially broad impacts of shaking, ground deformation, landslides, liquefaction, and even tsunamis, are extremely difficult to quantify without accelerated access to data, modeling, and analytics. This web-based application, deemed the "Earthquake Incident Journal", provides real-time access to authoritative and event-specific data from external (e.g. US Geological Survey, NASA, state and local governments, etc.) and internal (FEMA) data sources. The journal includes a GIS-based model for exposure analytics, allowing FEMA to assess the severity of an event, estimate impacts to structures and population in near real-time, and then apply planning factors to exposure estimates to answer questions such as: What geographic areas are impacted? Will federal support be needed? What resources are needed to support survivors? And which infrastructure elements or essential facilities are threatened? This presentation reviews the development of the Earthquake Incident Journal, detailing the data integration solutions, the methodology behind the GIS-based automated exposure model, and the planning factors as well as other analytical advances that

  15. Improving Operational Risk Management Using Business Performance Management Technologies

    Directory of Open Access Journals (Sweden)

    Bram Pieket Weeserik

    2018-02-01

    Full Text Available Operational Risk Management (ORM comprises the continuous management of risks resulting from: human actions, internal processes, systems, and external events. With increasing requirements, complexity and a growing volume of risks, information systems provide benefits for integrating risk management activities and optimizing performance. Business Performance Management (BPM technologies are believed to provide a solution for effective Operational Risk Management by offering several combined technologies including: work flow, data warehousing, (advanced analytics, reporting and dashboards. BPM technologies can be integrated with an organization’s Planning & Control cycle and related to strategic objectives. This manuscript aims to show how ORM can benefit from BPM technologies via the development and practical validation of a new maturity model. The B4ORM maturity model was developed following the Design Science Research approach. The maturity model relates specific maturity levels of ORM processes with BPM technologies applicable for a specific maturity stage. There appears to be a strong relationship (0.78 with ORM process maturity and supporting BPM technologies. The B4ORM maturity model as described in this manuscript provides an ideal path of BPM technologies related to six distinctive stages of ORM, leading towards technologies suitable for continuous improvement of ORM processes and organization-wide integration.

  16. Tank waste remediation system programmatic risk management plan

    International Nuclear Information System (INIS)

    Seaver, D.A.

    1995-01-01

    This risk management plan defines the approach to be taken to managing risks in the Tank Waste Remediation System (TWRS) program. It defines the actions to be taken at the overall program level, and the risk management requirements for lower-level projects and other activities. The primary focus of this plan is on ''programmatic'' risks, i.e., risks with respect to the cost, schedule, and technical performance of the program. The plan defines an approach providing managers with the flexibility to manage risks according to their specific needs, yet creates. The consistency needed for effectiveness across the program. The basic risk management approach uses a risk management list for the program, each project, and additional lower-level activities. The risk management list will be regularly reviewed and updated by appropriate level of management. Each list defines key risks, their likelihood and consequences, risk management actions to be taken, responsible individuals, and other management information

  17. Model of Axiological Dimension Risk Management

    Directory of Open Access Journals (Sweden)

    Kulińska Ewa

    2016-01-01

    Full Text Available It was on the basis of the obtained results that identify the key prerequisites for the integration of the management of logistics processes, management of the value creation process, and risk management that the methodological basis for the construction of the axiological dimension of the risk management (ADRM model of logistics processes was determined. By taking into account the contribution of individual concepts to the new research area, its essence was defined as an integrated, structured instrumentation aimed at the identification and implementation of logistics processes supporting creation of the value added as well as the identification and elimination of risk factors disturbing the process of the value creation for internal and external customers. The base for the ADRM concept of logistics processes is the use of the potential being inherent in synergistic effects which are obtained by using prerequisites for the integration of the management of logistics processes, of value creation and risk management as the key determinants of the value creation.

  18. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  19. LIQUIDITY MANAGEMENT AND CORPORATE RISK

    Directory of Open Access Journals (Sweden)

    Fenyves Veronika

    2011-07-01

    Full Text Available The consequence of the economic crisis, the access of the external financing resources was narrowed significantly and lenders had became more cautious. This meant that the external source providers analyze more thoroughly the source claimants, and they also need to be more aware of their situation, to submit well founded loan applications to financial institutions. The other aspect is why the indicators presented in the study, the firms should be addressed much more thoroughly than ever before to have a much better understanding their situation, to recognize the sources of internal funding opportunities, and to use more efficiently the available internal resources. However, analysts should be aware of which are the ratios which should be paid a special attention and which ones are essential to assess a given situation, knowing them they can properly inform the leaders as well as to give an appropriate help to the decision makers. To ensure the appropriate level of internal resources the company's activity is continuous financing closely related to the working capital management. The other reason is why the working capital management coming into view - which is linked to the previous one - that longer and longer payment periods have emerged in the corporate sales, in point of fact there is a significant increase in commercial lending period, the companies must be able to finance this period. The working capital is essential for companies to determine their short-term financial positions. A significant change in working capital provides an important information to the company's various stakeholders, and this is especially true for the net working capital. The working capital analysis is one way the company's creditability evaluation, and helps also to better understand the company's normal business cycle.

  20. Safety control and risk management

    International Nuclear Information System (INIS)

    Rasmussen, J.

    1987-01-01

    The acceptable probability of major accidents in nuclear power is very small, and can not be determined from direct empirical evidence. Therefore, control of the level of safety is a complex problem. The difficulty is related to the fact that a variable, 'safety', which is not accessible to direct measurement, is to be tightly controlled. Control, therefore, depends on a systematic, analytical prediction of the target state, i.e., the level of safety, from indirect evidence. From a control theoretic point of view this means that safety is controlled by a system which includes openloop as well as closed loop control paths. The aim of the paper is to take a general systems view on the complex mechanisms involved in the control of safety of industrial installations like nuclear power. From this, the role of probabilistic risk analysis is evaluated and needs for further development discussed. (author)

  1. Banking Risk Management in the Light of Basel II

    Directory of Open Access Journals (Sweden)

    Vasile DEDU

    2010-02-01

    Full Text Available This study presents a summary of what is the meaning of risk management in light of the Basel II Agreement. The study is structured in three parts, namely: credit risk management, significant credit risk management and credit risk management under Basel II Agreement. Thus, in the first part it refers to how developed the credit risk management over time and which are current phenomena that generate these risks, continuing in the second part with a summary of the reasons for which one wishes management of such credit risks, following the third party to talk about the shippings of Basel II in terms of credit risk management.

  2. Modeling financial disaster risk management in developing countries

    Science.gov (United States)

    Mechler, R.; Hochrainer, S.; Pflug, G.; Linnerooth-Bayer, J.

    2005-12-01

    The public sector plays a major role in reducing the long-term economic repercussions of disasters by repairing damaged infrastructure and providing financial assistance to households and businesses. If critical infrastructure is not repaired in a timely manner, there can be serious effects on the economy and the livelihoods of the population. The repair of public infrastructure, however, can be a significant drain on public budgets especially in developing and transition countries. Developing country governments frequently lack the liquidity, even including international aid and loans, to fully repair damaged critical public infrastructure or provide sufficient support to households and businesses for their recovery. The earthquake in Gujarat, and other recent cases of government post-disaster liquidity crises, have sounded an alarm, prompting financial development organizations, such as the World Bank, among others, to call for greater attention to reducing financial vulnerability and increasing the resilience of the public sector. This talk reports on a model designed to illustrate the tradeoffs and choices a developing country must make in financially managing the economic risks due to natural disasters. Budgetary resources allocated to pre-disaster risk management strategies, such as loss mitigation measures, a catastrophe reserve fund, insurance and contingent credit arrangements for public assets, reduce the probability of financing gaps - the inability of governments to meet their full obligations in providing relief to private victims and restoring public infrastructure - or prevent the deterioration of the ability to undertake additional borrowing without incurring a debt crisis. The model -which is equipped with a graphical interface - can be a helpful tool for building capacity of policy makers for developing and assessing public financing strategies for disaster risk by indicating the respective costs and consequences of financing alternatives.

  3. Risk management of a fund for natural disasters

    Science.gov (United States)

    Flores, C.

    2003-04-01

    Mexico is a country which has to deal with several natural disaster risks: earthquakes, droughts, volcanic eruptions, floods, slides, wild fires, extreme temperatures, etc. In order to reduce the country's vulnerability to the impact of these natural disasters and to support rapid recovery when they occur, the government established in 1996 Mexico's Fund for Natural Disasters (FONDEN). Since its creation, its resources have been insufficient to meet all government obligations. The aim of this project is the development of a dynamic strategy to optimise the management of a fund for natural disasters starting from the example of FONDEN. The problem of budgetary planning is being considered for the modelling. We control the level of the fund's cash (R_t)0money borrowed at time t. For the initial model, we assume that the deterministic payments for risk transfer and debt are made at t=0. We determine c>0 at t=0 and then we try to pull at every moment the process to this objective. Multifractal models in geophysics are physically based stochastic models. A multiplicative cascade model fitted to a data set can be used for generation of synthetic sequences that resemble the original data in terms of its scaling properties. Since recent years, uncertainty concepts based on multifractal fields are being applied to the development of techniques to calculate marginal and conditional probabilities of an extreme rainfall event in a determined zone. As initial point to the development of the model, a multifractal model for extreme rainfall events will be used as part of the input for the stochastic control model. A theme for further research is linking more warning systems to the model. Keywords: risk management, stochastic control, multifractal measures, multiplicative cascades, heavy rainfall events.

  4. Stakeholder Risk Management in Ethical Decision Making

    DEFF Research Database (Denmark)

    Lauesen, Linne Marie

    Stakeholder management has for the last three decades been concerned either with strategic business management or business ethics, values and quality. Many models have been developed, but recently the literature asks for more dynamic models instead of the staticism that characterizes some models....... management models does – for the sake of the wider social responsibilities of the businesses and its stakeholders.......Stakeholder management has for the last three decades been concerned either with strategic business management or business ethics, values and quality. Many models have been developed, but recently the literature asks for more dynamic models instead of the staticism that characterizes some models...... evidence from hybrid organizations as Publicly Owned Enterprises (POEs) mixed of private corporations and political administration. The model offers a new way of combining risk management with ethical decisionmaking processes by the inclusion of multiple stakeholders. Not only does the model apply...

  5. Enterprise risk management in international construction operations

    CERN Document Server

    Zhao, Xianbo; Low, Sui Pheng

    2015-01-01

    This book provides readers an understanding of the implementation of Enterprise Risk Management (ERM) for international construction operations. In an extended case study, it primarily focuses on Chinese construction firms (CCFs) based in Singapore. In this regard, the book explains the differences and similarities between Risk Management (RM), Project Risk Management (PRM) and ERM in the construction industry, and examines their linkages for international construction operations in a broader context. The explanation elaborates on how companies may adopt and implement RM, PRM and ERM as appropriate in their various operations, both in their home market as well as in overseas host markets. The book also reviews the whole spectrum of work relating to organizational behavior (OB) as one of the key underpinnings for companies to evaluate and implement ERM. It will benefit practitioners from the industry as well as academics interested in the implementation of ERM practices in international construction operat...

  6. BANK AUDITS AND RISK MANAGEMENT IN TURKEY

    Directory of Open Access Journals (Sweden)

    Ümit Gücenme GENÇOĞLU

    2011-01-01

    Full Text Available Banks are of vital importance in economies, because their bankruptcy leads to losses for millions of small savers. As a result, banks are closely audited all around the world. The prerequisite for a healthy economic system is the use of internal and external auditing and risk management in banks. In this study, the developments of internal and external audits in banking have been summarised according to regulations in Turkey and significant risks have been discussed in terms of bank management decisions and risk management. Additionally, Basel regulations and capital adequacy have been analysed and the problems that affect the banking sector in Turkey have been summarised. The aim of our study is to determine the current situation and this study is based on a literature and regulation review.

  7. Weather Risk Management in Agriculture

    Directory of Open Access Journals (Sweden)

    Martina Bobriková

    2016-01-01

    Full Text Available The paper focuses on valuation of a weather derivative with payoffs depending on temperature. We use historical data from the weather station in the Slovak town Košice to obtain unique prices of option contracts in an incomplete market. Numerical examples of prices of some contracts are presented, using the Burn analysis. We provide an example of how a weather contract can be designed to hedge the financial risk of a suboptimal temperature condition. The comparative comparison of the selected option hedging strategies has shown the best results for the producers in agricultural industries who hedges against an unfavourable weather conditions. The results of analysis proved that by buying put option or call option, the farmer establishes the highest payoff in the case of temperature decrease or increase. The Long Straddle Strategy is the most expensive but is available to the farmer who hedges against a high volatility in temperature movement. We conclude with the findings that weather derivatives could be useful tools to diminish the financial losses for agricultural industries highly dependent for temperature.

  8. Risk management of agricultural floods

    Directory of Open Access Journals (Sweden)

    Skakavac Zdravko

    2017-01-01

    Full Text Available Agricultural production in Serbia accounts for the largest part of the gross domestic product and can be an economic backbone and the main driver of the domestic food industry and exports, primarily because of its potential such as arable land and a long tradition of agricultural production in these regions. However, numerous risks threaten its stability. The focus of our research is agricultural flooding. The set-up aim of the research is an examination of the causes and consequences of agricultural fields in order to holistically research the current problem. In order to achieve the target, in the paper we will analyze the realization of floods in Serbia, followed by subjective and objective factors of the realization of floods, or the realization of floods caused by human or natural forces and then we will point out the economic consequences of the execution of agricultural floods as well as the application of preventive measures and measures of financing the resulting economic consequences.

  9. Managing dynamic epidemiological risks through trade

    Science.gov (United States)

    Horan, Richard D.; Fenichel, Eli P.; Finnoff, David; Wolf, Christopher A.

    2015-01-01

    There is growing concern that trade, by connecting geographically isolated regions, unintentionally facilitates the spread of invasive pathogens and pests – forms of biological pollution that pose significant risks to ecosystem and human health. We use a bioeconomic framework to examine whether trade always increases private risks, focusing specifically on pathogen risks from live animal trade. When the pathogens have already established and traders bear some private risk, we find two results that run counter to the conventional wisdom on trade. First, uncertainty about the disease status of individual animals held in inventory may increase the incentives to trade relative to the disease-free case. Second, trade may facilitate reduced long-run disease prevalence among buyers. These results arise because disease risks are endogenous due to dynamic feedback processes involving valuable inventories, and markets facilitate the management of private risks that producers face with or without trade. PMID:25914431

  10. GENERAL RISKS AND UNCERTAINTIES OF REPORTING AND MANAGEMENT REPORTING RISKS

    Directory of Open Access Journals (Sweden)

    CAMELIA I. LUNGU

    2011-04-01

    Full Text Available Purpose: Highlighting risks and uncertainties reporting based on a literature review research. Objectives: The delimitation of risk management models and uncertainties in fundamental research. Research method: Fundamental research study directed to identify the relevant risks’ models presented in entities’ financial statements. Uncertainty is one of the fundamental coordinates of our world. As showed J.K. Galbraith (1978, the world now lives under the age of uncertainty. Moreover, we can say that contemporary society development could be achieved by taking decisions under uncertainty, though, risks. Growing concern for the study of uncertainty, its effects and precautions led to the rather recent emergence of a new science, science of hazards (les cindyniques - l.fr. (Kenvern, 1991. Current analysis of risk are dominated by Beck’s (1992 notion that a risk society now exists whereby we have become more concerned about our impact upon nature than the impact of nature upon us. Clearly, risk permeates most aspects of corporate but also of regular life decision-making and few can predict with any precision the future. The risk is almost always a major variable in real-world corporate decision-making, and managers that ignore it are in a real peril. In these circumstances, a possible answer is assuming financial discipline with an appropriate system of incentives.

  11. MANAGING RISK IN ORGANIZATION OF SPORTING EVENTS

    Directory of Open Access Journals (Sweden)

    Miodrag Koprivica

    2013-07-01

    Full Text Available Sport Management is, without doubt, a modern, practical but at the same time scientific and theoretical trend. Starting with the definition of the word „event“ as an activity that is limited in terms of time, place and a number of participants who gather together with a certain agenda in their mind, an unbreakable connection between it and sport has been made. Risks that appear in this branch of industry of sport are multiple, hardly foreseeable, and with possible long-term consequences. Precisely for that reason, it is important to provide the answers to the questions of what the crisis and crisis management in sport management are, and to establish the processes and stages of risk management

  12. Operational earthquake forecasting can enhance earthquake preparedness

    Science.gov (United States)

    Jordan, T.H.; Marzocchi, W.; Michael, A.J.; Gerstenberger, M.C.

    2014-01-01

    We cannot yet predict large earthquakes in the short term with much reliability and skill, but the strong clustering exhibited in seismic sequences tells us that earthquake probabilities are not constant in time; they generally rise and fall over periods of days to years in correlation with nearby seismic activity. Operational earthquake forecasting (OEF) is the dissemination of authoritative information about these time‐dependent probabilities to help communities prepare for potentially destructive earthquakes. The goal of OEF is to inform the decisions that people and organizations must continually make to mitigate seismic risk and prepare for potentially destructive earthquakes on time scales from days to decades. To fulfill this role, OEF must provide a complete description of the seismic hazard—ground‐motion exceedance probabilities as well as short‐term rupture probabilities—in concert with the long‐term forecasts of probabilistic seismic‐hazard analysis (PSHA).

  13. Sincope: clinic risk determination and therapeutic management

    Directory of Open Access Journals (Sweden)

    Fabio Mecca

    2007-06-01

    Full Text Available Syncope is a frequent symptom characterizing a wide group of pathologies with very different prognosis. By this reason, it is necessary a careful risk stratification for a better patient management. For this aim medical history and physical examination are fundamental. Diagnostic exams complete and confirm diagnostic suspiciousness formulated by medical history and examination, but rarely give elements for unexpected diagnosis. Correct identification of pathological mechanism of syncope and determination of associated clinical risk allow the best patient management avoiding dangerous discharge but also, in relation to increasingly limited resources, inappropriate hospitalizations.

  14. RISK MANAGEMENT COMPANIES AND HEDGE ACCOUNTING

    Directory of Open Access Journals (Sweden)

    SABIN ARMĂŞELU

    2014-12-01

    Full Text Available The increasing use of derivatives for risk management of a company lately has led to the need to report on an actual basis as these instruments and regulate these operations accounting. This paper proposes a presentation of hedging transactions and their accounting evaluating the impact, in terms of accounting, risk management derivatives on a company. Hedges are often ineffective. Overcoming the ineffectiveness of hedging operations can be achieved by proper designation of the hedging relationship and create an appropriate method to demonstrate hedge effectiveness.

  15. Risk Management in IT Governance Framework

    Directory of Open Access Journals (Sweden)

    Mirela GHEORGHE

    2011-12-01

    Full Text Available The concept of governance has an already old contour: the system by which business corporations are directed and controlled. The most praised principles regarding shareholder rights, transparency and board accountability now constitute the foundation for new tendencies evolved from such ground. Executive compensation, transparency and shareholder reporting are new issues attached to board responsibilities. Besides such almost negative approaches the board faces a more and more prominent role from risk management and IT governance perspective. Nowadays is generally acknowledged that the board is in charge for managing and controlling the risks to assets of the enterprises and business future. IT Governance has emerged as a support for corporate governance, as an important part of board’s striving efforts to perform better in a competition environment. These responsibilities, risk management and IT Governance, remain within the framework of old concept of corporate governance and are fed from its substance. The interaction between these concepts is the core interest of this research.IT Governance is defined as procedures and policies established in order to assure that the IT system of an organization sustains its goals and strategies. The management of the organisations face a new challenge: structural redefinition of the IT component in order to create plus value and to minimize IT risks through an efficient management of all IT resources of the organisation. The evolution of the present IT environment is a natural process according to which business environment should adapt.

  16. Managing industrial price risk: a balancing act

    International Nuclear Information System (INIS)

    Muse, J-F.

    2000-01-01

    The challenge of managing industrial price risk is assessed by a senior executive of Cargill, a diversified industrial conglomerate, involved in steel manufacturing and recycling, oilseeds, cocoa, beef, pork, and poultry processing, fertilizer and fruit juice production, in addition to trading and financial risk management. Energy is a key component in many of Cargill's businesses, hence the company has good reason to be concerned about price volatility. The effects of energy risk management on the company's shareholders are demonstrated by an analysis of month-to-month price fluctuations over the Nov 1999 to Oct 2000 period, showing the monthly value of risk at the 95 per cent confidence level as $4,832,195. The effects of alternatives for an end-user such as passing on cost to customers, improving energy efficiency. fuel switching and production curtailment, are explored and limitations and problems with each of the approaches are discussed. The best options for industrial end-users of natural gas are suggested to be a proactive risk management program in the short-term and asset diversification, fuel switching, and geographic relocation of production facilities in the long-term

  17. Highly Enhanced Risk Management Emergency Satellite

    DEFF Research Database (Denmark)

    Dalmeir, Michael; Gataullin, Yunir; Indrajit, Agung

    HERMES (Highly Enhanced Risk Management Emergency Satellite) is potential European satellite mission for global flood management, being implemented by Technical University Munich and European Space Agency. With its main instrument - a reliable and precise Synthetic Aperture Radar (SAR) antenna...... highly effective and orbit proven hardware is used, HERMES is designed to be reliable, precise and of low cost. The project can be extended for use on other space bodies (planets) for rapid observation of the planetary surface....

  18. Coastal Risk Management in a Changing Climate

    DEFF Research Database (Denmark)

    Burcharth, Hans F.; Zanuttigh, Barbara; Andersen, Thomas Lykke

    2014-01-01

    Existing coastal management and defense approaches are not well suited to meet the challenges of climate change and related uncertanities. Professionals in this field need a more dynamic, systematic and multidisciplinary approach. Written by an international group of experts, Coastal Risk...... Management in a Changing Climate provides innovative, multidisciplinary best practices for mitigating the effects of climate change on coastal structures. Based on the Theseus program, the book includes eight study sites across Europe, with specific attention to the most vulnerable coastal environments...

  19. Does Corporate Governance Impact Risk Management System?

    Directory of Open Access Journals (Sweden)

    Petre BREZEANU

    2011-04-01

    Full Text Available This paper brings forth the contribution of corporate governance to risk management system at the enterprise level. The research is a complex one, integrating both quantitative and qualitative information. The quantitative information consists of balance sheet and profit and loss account data while the qualitative one includes dummy variables reflecting the agency and monitoring costs which govern the relationship between managers and shareholders.

  20. Bayesian networks for management of industrial risk

    International Nuclear Information System (INIS)

    Munteanu, P.; Debache, G.; Duval, C.

    2008-01-01

    This article presents the outlines of Bayesian networks modelling and argues for their interest in the probabilistic studies of industrial risk and reliability. A practical case representative of this type of study is presented in support of the argumentation. The article concludes on some research tracks aiming at improving the performances of the methods relying on Bayesian networks and at widening their application area in risk management. (authors)

  1. Online professional networks for physicians: risk management.

    Science.gov (United States)

    Hyman, Jon L; Luks, Howard J; Sechrest, Randale

    2012-05-01

    The rapidly developing array of online physician-only communities represents a potential extraordinary advance in the availability of educational and informational resources to physicians. These online communities provide physicians with a new range of controls over the information they process, but use of this social media technology carries some risk. The purpose of this review was to help physicians manage the risks of online professional networking and discuss the potential benefits that may come with such networks. This article explores the risks and benefits of physicians engaging in online professional networking with peers and provides suggestions on risk management. Through an Internet search and literature review, we scrutinized available case law, federal regulatory code, and guidelines of conduct from professional organizations and consultants. We reviewed the OrthoMind.com site as a case example because it is currently the only online social network exclusively for orthopaedic surgeons. Existing case law suggests potential liability for orthopaedic surgeons who engage with patients on openly accessible social network platforms. Current society guidelines in both the United States and Britain provide sensible rules that may mitigate such risks. However, the overall lack of a strong body of legal opinions, government regulations as well as practical experience for most surgeons limit the suitability of such platforms. Closed platforms that are restricted to validated orthopaedic surgeons may limit these downside risks and hence allow surgeons to collaborate with one another both as clinicians and practice owners. Educating surgeons about the pros and cons of participating in these networking platforms is helping them more astutely manage risks and optimize benefits. This evolving online environment of professional interaction is one of few precedents, but the application of risk management strategies that physicians use in daily practice carries over

  2. Disclosures on managing human rights risks

    OpenAIRE

    ACCA Australia and New Zealand; Net Balance Foundation; CAER

    2011-01-01

    This report examines the human rights governance, risk management and reporting quality of companies in the ASX 100. The report focuses predominantly on the 47 companies in the ASX 100 identified by CAER as having high-risk exposure to human rights issues, on the basis they are operating in countries with human rights concerns. The report also addresses, in brief, the approach of the remaining 53 ASX 100 companies not operating in countries of concern but with potential exposure to other huma...

  3. Managing information risk a director's guide

    CERN Document Server

    Mitchell, Stewart

    2009-01-01

    This pocket guide addresses the scope of risks involved in a modern IT system, and outlines strategies for working through the process of putting risk management at the heart of your corporate culture. Given that no two companies are the same, this pocket guide should not be taken as a step-by-step guide, but should provide decision makers with a solid overview of the factors they need to consider and a framework for implementing a regime that suits their needs.

  4. Perceptions of food risk management among key stakeholders

    DEFF Research Database (Denmark)

    van Kleef, Ellen; Frewer, Lynn J.; Chryssochoidis, George M.

    2006-01-01

    In designing and implementing appropriate food risk management strategies, it is important to examine how key stakeholders perceive both the practice and effectiveness of food risk management.......In designing and implementing appropriate food risk management strategies, it is important to examine how key stakeholders perceive both the practice and effectiveness of food risk management....

  5. Observational studies in South African mines to mitigate seismic risks: implications for mine safety and tectonic earthquakes

    Science.gov (United States)

    Durrheim, Raymond; Ogaswara, Hiroshi; Nakatani, Masao; Yabe, Yasuo; Milev, Alexander; Cichowicz, Artur; Kawakata, Hironori; Moriya, Hirokazu; Naoi, Makoto; Kgarume, Thabang; Murakami, Osamu; Mngadi, Siyanda

    2014-05-01

    Seismicity poses a significant risk to workers in deep and overstressed mines, such as the gold mines in the Witwatersrand basin of South Africa, as well as inhabitants of earthquake-prone regions such as Japan. A 5-year collaborative project entitled "Observational studies in South African mines to mitigate seismic risks" was launched in 2010 to address these risks, drawing on over a century of South African and Japanese research experience with respect to mining-related and tectonic earthquakes, respectively. The project has three main aims: (1) to learn more about earthquake preparation and triggering mechanisms by deploying arrays of sensitive sensors within rock volumes where mining is likely to induce seismic activity; (2) to learn more about earthquake rupture and rockburst damage phenomena by deploying robust strong ground motion sensors close to potential fault zones and on stope hangingwalls; and (3) to upgrade the South African surface national seismic network in the mining districts. Research sites have been established at mines operated by Sibanye Gold (Hlanganani Shaft and Cooke #4 Shaft) and Anglogold Ashanti (Moab-Khotsong). More than 70 boreholes (totalling more than 2.8 km in length) have been drilled to locate "capable" faults i.e. faults that are considered likely to become seismically active as a result of mining activity and to deploy sensors. Acoustic emission sensors, strain- and tilt meters, and controlled seismic sources were installed to monitor the deformation of the rock mass, the accumulation of damage during the earthquake preparation phase, and changes in dynamic stress produced by the propagation of the rupture front. These data are being integrated with measurements of rock properties, stope closure, stope strong motion, seismic data recorded by the mine-wide network, and stress modelling. The mid-point of the 5-year project has passed. New observations of stress and the response of the rock mass to mining have already been made

  6. FINANCIAL RISK MANAGEMENT – INFLUENCE FACTORS AND NEW TRENDS

    OpenAIRE

    Laura Vasilescu

    2014-01-01

    Financial or corporate risk management is a part of the firm risk management with which deal with the financial risks, such as market risk, liquidity risk and credit risk. In the context of international financial crisis, a variety of factors are influencing the development of corporate risk management: the increased volatility and deregulation of financial markets; developments in information and communications technology; the complexity of financial products and so on. The objective of risk...

  7. Theoretical concept of credit risk management

    Directory of Open Access Journals (Sweden)

    Dragosavac Miloš

    2014-01-01

    Full Text Available With the development of the banking business and the economy, exposure to different types of risk becomes greater. Identifying all risks and adequate measures have become an extremely important factor in business success in the increasingly complex economic conditions. Risks in business, in the last ten years have become the burning issue in debates among the scientific experts. With the aim of stable development of its business and equal participation in a large competitive market, primarily in order to protect its depositors and preserve system stability and liquidity, banks have to incorporate into their strategic goals the strategies of banking risks. Credit risk is of great value within the overall risks that accompany the business activity of banks, economy, and other forms of business organization. Its nature and presence in all segments of the business activities speak enough about its importance and the need for its management. Permanently growing trend of credit risk is a reality faced by not only the banking organization, but also the subjects in the economic and non-economic sector, which makes the issue of credit risk extremely important and relevant. The subject of this paper is a theoretical analysis of credit risk in banking business. Banking operations are increasingly exposed to credit risk, which indicates the inability of banks to settle their claims based on previously approved loans, and this is the case-in-point for this specific research subject.

  8. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  9. Comparative risk assessments for the city of Pointe-à-Pitre (French West Indies): earthquakes and storm surge

    Science.gov (United States)

    Reveillere, A. R.; Bertil, D. B.; Douglas, J. D.; Grisanti, L. G.; Lecacheux, S. L.; Monfort, D. M.; Modaressi, H. M.; Müller, H. M.; Rohmer, J. R.; Sedan, O. S.

    2012-04-01

    In France, risk assessments for natural hazards are usually carried out separately and decision makers lack comprehensive information. Moreover, since the cause of the hazard (e.g. meteorological, geological) and the physical phenomenon that causes damage (e.g. inundation, ground shaking) may be fundamentally different, the quantitative comparison of single risk assessments that were not conducted in a compatible framework is not straightforward. Comprehensive comparative risk assessments exist in a few other countries. For instance, the Risk Map Germany project has developed and applied a methodology for quantitatively comparing the risk of relevant natural hazards at various scales (city, state) in Germany. The present on-going work applies a similar methodology to the Pointe-à-Pitre urban area, which represents more than half of the population of Guadeloupe, an overseas region in the French West Indies. Relevant hazards as well as hazard intensity levels differ from continental Europe, which will lead to different conclusions. French West Indies are prone to a large number of hazards, among which hurricanes, volcanic eruptions and earthquakes dominate. Hurricanes cause damage through three phenomena: wind, heavy rainfall and storm surge, the latter having had a preeminent role during the largest historical event in 1928. Seismic risk is characterized by many induced phenomena, among which earthquake shocks dominate. This study proposes a comparison of earthquake and cyclonic storm surge risks. Losses corresponding to hazard intensities having the same probability of occurrence are calculated. They are quantified in a common loss unit, chosen to be the direct economic losses. Intangible or indirect losses are not considered. The methodology therefore relies on (i) a probabilistic hazard assessment, (ii) a loss ratio estimation for the exposed elements and (iii) an economic estimation of these assets. Storm surge hazard assessment is based on the selection of

  10. Estimation, assessment and management of risks

    International Nuclear Information System (INIS)

    Reinoehl-Kompa, S.

    2005-01-01

    After the introductory lectures the closed conference divided into sessions on the estimation, assessment and management of risks. This review article summarises some of the central issues which were addressed in the discussions held during the closed conference and which may be of significance for the future work of the ''Radiation Risk'' Committee within the Radiation Protection Commission. Fundamental difficulties still persist in the implementation of risk quantities within the concepts of radiation protection (lectures by Breckow and Kiefer). Some of these difficulties have to do with the definition of dose quantities, in particular with the one most central to radiation protection, the effective dose. In the field of sparsely ionizing radiation attention was focused on two main topics, namely the risk of acquiring thyroid cancer in association with the Chernobyl desaster and analyses of new mortality data on the survivors of the nuclear bomb attacks on Hiroshima and Nagasaki. In the area of lung cancer risk from radon exposure, attention was focused on indoor exposure and the cohort study on bismuth miners. The body of knowledge that has accumulated on the risk of acquiring cancer through UV radiation takes a special position within the wider field of risks associated with nonionizing radiation, since much has already been achieved towards identifying the action mechanisms involved here. Since skin cancer shows the highest increments in incidence of all types of cancer, estimating the risk of acquiring skin cancer through UV radiation will be an important issue in future. One of the tasks of risk management is to translate the results of risk assessment into action. One task of particular importance in this regard is ''risk communication'', the problems surrounding which were illuminated from different perspectives in various contributions

  11. The association between exposure and psychological health in earthquake survivors from the Longmen Shan Fault area: the mediating effect of risk perception

    Directory of Open Access Journals (Sweden)

    Jiuping Xu

    2016-05-01

    Full Text Available Abstract Background In this study, exposure refers to survivors who suffered from life-changing situations, such as personal injuries, the deaths or injury of family members, relatives or friends or the loss of or damage to personal or family property, as a result of the earthquake. The mediating effect of risk perception on the exposure and psychological health in survivors from the Longmen Shan Fault area and the moderating effect of social support on the relationship between risk perception and psychological health were both examined. Method A cross-sectional survey was conducted in a local Longmen Shan Fault area near the epicenter of the 2008 Wenchuan earthquake. The Diagnostic and Statistical Manual of Mental Disorders, Fourth Edition (DSM-IV, the standard Chinese 12-item Short Form (SF-12v2, and the Social Support Rating Scale (SSRS were used to interview 2,080 earthquake survivors in the period one-year after the earthquake. Based on the environment and the characteristics of the Longmen Shan Fault area, a risk perception questionnaire was developed to evaluate survivor risk perception. Factor and regression analyses were conducted to determine the hypothetical relations. Results The analyses provided effective support for the hypothesized model. Survivor risk perception was classified into direct risk perception and indirect risk perception. Survivor direct risk perception was found to play a partial mediating role in the relationship between exposure and the two domains (Physical component summary (PCS and the Mental component summary (MCS of psychological health. Survivor indirect risk perception was found to have a only partial mediating effect on the association between exposure and MCS. Social support was found to moderate the influence of risk perception on psychological health. Conclusion Risk communication should be considered in future post-earthquake psychological assistance programs and social support strategies could also be

  12. Defeating Earthquakes

    Science.gov (United States)

    Stein, R. S.

    2012-12-01

    The 2004 M=9.2 Sumatra earthquake claimed what seemed an unfathomable 228,000 lives, although because of its size, we could at least assure ourselves that it was an extremely rare event. But in the short space of 8 years, the Sumatra quake no longer looks like an anomaly, and it is no longer even the worst disaster of the Century: 80,000 deaths in the 2005 M=7.6 Pakistan quake; 88,000 deaths in the 2008 M=7.9 Wenchuan, China quake; 316,000 deaths in the M=7.0 Haiti, quake. In each case, poor design and construction were unable to withstand the ferocity of the shaken earth. And this was compounded by inadequate rescue, medical care, and shelter. How could the toll continue to mount despite the advances in our understanding of quake risk? The world's population is flowing into megacities, and many of these migration magnets lie astride the plate boundaries. Caught between these opposing demographic and seismic forces are 50 cities of at least 3 million people threatened by large earthquakes, the targets of chance. What we know for certain is that no one will take protective measures unless they are convinced they are at risk. Furnishing that knowledge is the animating principle of the Global Earthquake Model, launched in 2009. At the very least, everyone should be able to learn what his or her risk is. At the very least, our community owes the world an estimate of that risk. So, first and foremost, GEM seeks to raise quake risk awareness. We have no illusions that maps or models raise awareness; instead, earthquakes do. But when a quake strikes, people need a credible place to go to answer the question, how vulnerable am I, and what can I do about it? The Global Earthquake Model is being built with GEM's new open source engine, OpenQuake. GEM is also assembling the global data sets without which we will never improve our understanding of where, how large, and how frequently earthquakes will strike, what impacts they will have, and how those impacts can be lessened by

  13. Audit of psychosocial risk management systems

    DEFF Research Database (Denmark)

    Jespersen, Anne Helbo; Hasle, Peter; Hohnen, Pernille

    2014-01-01

    organizations on how to manage risks. Internal and external audits of compliance with the standard are key elements. Auditors should be competent to carry out the task and be familiar with risks of the areas they are auditing. The competences and practice of internal auditors have been studied...... in two Danish municipalities. The results show that auditors have a varied background and a limited knowledge about psychosocial risks. They have difficulties in carrying out audits and the results are mainly influenced by personal preferences....

  14. 75 FR 30106 - Terrorism Risk Insurance Program; Litigation Management Submissions

    Science.gov (United States)

    2010-05-28

    ... Terrorism Risk Insurance Program; Litigation Management Submissions AGENCY: Departmental Offices. ACTION..., the Terrorism Risk Insurance Program Office is seeking comments regarding Litigation Management..., preferably an original and two copies) to: Terrorism Risk Insurance Program, Public Comment Record, Suite...

  15. Safety Risk Management for Homeland Defense and Security Responders

    National Research Council Canada - National Science Library

    Meyers, Tommey H

    2005-01-01

    .... Coast Guard and the U.S. Navy. This revealed that Operational Risk Management (ORM), a risk-based decision-making tool that systematically balances risk and mission completion, and Crew Resource Management (CRM...

  16. The social stakes of the radiological risk management

    International Nuclear Information System (INIS)

    Schieber, C.; Lochard, J.

    1999-01-01

    This presentation studies the management of radiological risk in the frame of public confidence and risk acceptability. The ALARA principle is studied to see how it can be an acceptability factor in the radiological risk management. (N.C.)

  17. 77 FR 13585 - Electricity Subsector Cybersecurity Risk Management Process Guideline

    Science.gov (United States)

    2012-03-07

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process Guideline AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of public... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  18. 77 FR 30517 - Electricity Subsector Cybersecurity Risk Management Process

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of publication. SUMMARY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  19. Megacity Indicator System for Disaster Risk Management in Istanbul (MegaIST)

    Science.gov (United States)

    Yahya Menteşe, Emin; Kılıç, Osman; Baş, Mahmut; Khazai, Bijan; Ergün Konukcu, Betul; Emre Basmacı, Ahmet

    2017-04-01

    Decision makers need tools to understand the priorities and to set up benchmarks and track progress in their disaster risk reduction activities, so that they can justify their decisions and investments. In this regard, Megacity Indicator System for Disaster Risk Management (MegaIST), is developed in order to be used in disaster risk management studies, for decision makers and managers to establish right strategies and proper risk reduction actions, enhance resource management and investment decisions, set priorities, monitor progress in DRM and validate decisions taken with the aim of helping disaster oriented urban redevelopment, inform investors about risk profile of the city and providing a basis for dissemination and sharing of risk components with related stakeholders; by Directorate of Earthquake and Ground Research of Istanbul Metropolitan Municipality (IMM). MegaIST achieves these goals by analyzing the earthquake risk in three separate but complementary sub-categories consisting of "urban seismic risk, coping capacity and disaster risk management index" in an integrated way. MegaIST model fosters its analyses by presenting the outputs in a simple and user friendly format benefiting from GIS technology that ensures the adoptability of the model's use. Urban seismic risk analysis includes two components, namely; Physical Risk and Social Vulnerability Analysis. Physical risk analysis is based on the possible physical losses (such as building damage, casualties etc.) due to an earthquake while social vulnerability is considered as a factor that increases the results of the physical losses in correlation with the level of education, health, economic status and disaster awareness/preparedness of society. Coping capacity analysis is carried out with the aim of understanding the readiness of the Municipality to respond and recover from a disaster in Istanbul can be defined both in terms of the Municipality's operational capacities - the capacity of the

  20. Debris Flow Risk Management Framework and Risk Analysis in Taiwan, A Preliminary Study

    Science.gov (United States)

    Tsao, Ting-Chi; Hsu, Wen-Ko; Chiou, Lin-Bin; Cheng, Chin-Tung; Lo, Wen-Chun; Chen, Chen-Yu; Lai, Cheng-Nong; Ju, Jiun-Ping

    2010-05-01

    Taiwan is located on a seismically active mountain belt between the Philippine Sea plate and Eurasian plate. After 1999's Chi-Chi earthquake (Mw=7.6), landslide and debris flow occurred frequently. In Aug. 2009, Typhoon Morakot struck Taiwan and numerous landslides and debris flow events, some with tremendous fatalities, were observed. With limited resources, authorities should establish a disaster management system to cope with slope disaster risks more effectively. Since 2006, Taiwan's authority in charge of debris flow management, the Soil and Water Conservation Bureau (SWCB), completed the basic investigation and data collection of 1,503 potential debris flow creeks around Taiwan. During 2008 and 2009, a debris flow quantitative risk analysis (QRA) framework, based on landslide risk management framework of Australia, was proposed and conducted on 106 creeks of the 30 villages with debris flow hazard history. Information and value of several types of elements at risk (bridge, road, building and crop) were gathered and integrated into a GIS layer, with the vulnerability model of each elements at risk applied. Through studying the historical hazard events of the 30 villages, numerical simulations of debris flow hazards with different magnitudes (5, 10, 25, 50, 100 and 200 years return period) were conducted, the economic losses and fatalities of each scenario were calculated for each creek. When taking annual exceeding probability into account, the annual total risk of each creek was calculated, and the results displayed on a debris flow risk map. The number of fatalities and frequency were calculated, and the F-N curves of 106 creeks were provided. For F-N curves, the individual risk to life per year of 1.0E-04 and slope of 1, which matched with international standards, were considered to be an acceptable risk. Applying the results of the 106 creeks onto the F-N curve, they were divided into 3 categories: Unacceptable, ALARP (As Low As Reasonable Practicable) and