WorldWideScience

Sample records for early operating experience

  1. Evaluation of operating experience for early recognition of deteriorating safety performance

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.

    2004-01-01

    One of the most difficult challenges facing nuclear power plants is to recognize the early signs of degrading safety performance before regulatory requirements are imposed or serious incidents or accidents occur. Today, the nuclear industry is striving for collecting more information on occurrences that could improve the operational safety performance. To achieve this, the reporting threshold has been lowered from incidents to anomalies with minor or no impact to safety. Industry experience (also outside nuclear industry) has shown that these are typical issues which should be considered when looking for such early warning signs. Therefore, it is important that nuclear power plant operators have the capability to trend, analyse and recognize early warning signs of deteriorating performance. It is necessary that plant operators are sensitive to these warning signs which may not be immediately evident. Reviewing operating experience is one of the main tasks for plant operators in their daily activities. Therefore, self assessment should be at the centre of any operational safety performance programme. One way of applying a self assessment program is through the following four basic elements: operational data, events, safety basis, and related experience. This approach will be described in the paper in more details. (authors)

  2. Early tracking would improve the operative experience of general surgery residents.

    Science.gov (United States)

    Stain, Steven C; Biester, Thomas W; Hanks, John B; Ashley, Stanley W; Valentine, R James; Bass, Barbara L; Buyske, Jo

    2010-09-01

    High surgical complexity and individual career goals has led most general surgery (GS) residents to pursue fellowship training, resulting in a shortage of surgeons who practice broad-based general surgery. We hypothesize that early tracking of residents would improve operative experience of residents planning to be general surgeons, and could foster greater interest and confidence in this career path. Surgical Operative Log data from GS and fellowship bound residents (FB) applying for the 2008 American Board of Surgery Qualifying Examination (QE) were used to construct a hypothetical training model with 6 months of early specialization (ESP) for FB residents in 4 specialties (cardiac, vascular, colorectal, pediatric); and presumed these cases would be available to GS residents within the same program. A total of 142 training programs had both FB residents (n = 237) and GS residents (n = 402), and represented 70% of all 2008 QE applicants. The mean numbers of operations by FB and GS residents were 1131 and 1091, respectively. There were a mean of 252 cases by FB residents in the chief year, theoretically making 126 cases available for each GS resident. In 9 defined categories, the hypothetical model would result in an increase in the 5-year operative experience of GS residents (mastectomy 6.5%; colectomy 22.8%; gastrectomy 23.4%; antireflux procedures 23.4%; pancreatic resection 37.4%; liver resection 29.3%; endocrine procedures 19.6%; trauma operations 13.3%; GI endoscopy 6.5%). The ESP model improves operative experience of GS residents, particularly for complex gastrointestinal procedures. The expansion of subspecialty ESP should be considered.

  3. early experience of operative treatment of pelvic and acetabular

    African Journals Online (AJOL)

    Objective: To review early post-operative results of pelvic and acetabular fracture intern al fixation. Design: ... 600 needing operative treatment annually. ... Infection was controlled with debridement and antibiotics. All the patients in the study returned to their work except one who has yet to do so 5 months after his injury.

  4. Helium experiments on Alcator C-Mod in support of ITER early operations

    Science.gov (United States)

    Kessel, C. E.; Wolfe, S. M.; Reinke, M. L.; Hughes, J. W.; Lin, Y.; Wukitch, S. J.; Baek, S. G.; Bonoli, P. T.; Chilenski, M.; Diallo, A.; the Alcator C-Mod Team

    2018-05-01

    Helium majority experiments on Alcator C-Mod were performed to compare with deuterium discharges, and inform ITER early operations. ELMy H-modes were produced with a special plasma shape at B T  =  5.3 T, I P  =  0.9 MA, at q 95 ~ 3.8. The He fraction ranged over, n He,L/n L  =  0.2-0.4, with n D,L/n L  =  0.15-0.26, compared to D plasmas with n D,L/n L  =  0.85-0.97. The power to enter the H-mode in He was found to be greater than ~2 times that for D discharges, in the low density region  operation in ITER.

  5. Water-hammer experiences in the startup and early operation of the Shearon Harris plant

    International Nuclear Information System (INIS)

    Casada, D.

    1987-01-01

    During the startup testing and initial operation of any power plant, systems undergo planned transients to confirm their ability to respond as designed. In addition to planned testing, unplanned transients infrequently occur as equipment is initially used. Some of both the planned and unplanned transients result in water-hammer events. Several water-hammer events experienced during preoperational testing, power ascension testing, and early operation of the Shearon Harris nuclear power plant are presented. The cause, effect, and corrective actions undertaken to prevent recurrence for each event discussed are provided. In addition, examples of preventive measures taken, based on industry experience accrued at other plants, to prevent a similar occurrence at Shearon Harris are discussed

  6. CMS experiment at the LHC Commissioning and early physics

    CERN Document Server

    Safonov, A

    2010-01-01

    The CMS collaboration used the past year to greatly improve the level of detector readiness for the first collisions data. The acquired operational experience over this year, large gains in understanding the detector and improved preparedness for early physics will be instrumental in minimizing the time from the first collisions to first LHC physics. The following describes the status of the CMS experiment and outlines early physics plans with the first LHC data.

  7. EBR-II: twenty years of operating experience

    International Nuclear Information System (INIS)

    Lentz, G.L.; Buschman, H.W.; Smith, R.N.

    1985-01-01

    Experimental Breeder Reactor No. 2 (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. For the last 20 years EBR-II has operated safely, has demonstrated stable operating characteristics, has shown excellent performance of its sodium components, and has had an excellent plant factor. These years of operating experience provide a valuable resource to the nuclear community for the development and design of future liquid metal fast reactors. This report provides a brief description of the EBR-II plant and its early operating experience, describes some recent problems of interest to the nuclear community, and also mentions some of the significant operating achievements of EBR-II. Finally, a few words and speculations on EBR-II's future are offered. 4 figs., 1 tab

  8. Natural uranium metallic fuel elements: fabrication and operating experience

    International Nuclear Information System (INIS)

    Hammad, F.H.; Abou-Zahra, A.A.; Sharkawy, S.W.

    1980-01-01

    The main reactor types based on natural uranium metallic fuel element, particularly the early types, are reviewed in this report. The reactor types are: graphite moderated air cooled, graphite moderated gas cooled and heavy water moderated reactors. The design features, fabrication technology of these reactor fuel elements and the operating experience gained during reactor operation are described and discussed. The interrelation between operating experience, fuel design and fabrication was also discussed with emphasis on improving fuel performance. (author)

  9. Preheat operating experiences at the FFTF

    International Nuclear Information System (INIS)

    Tucker, W.R.

    1978-01-01

    The rather extensive test program performed on the FFTF preheat control system resulted in successful sodium fill of one secondary heat transport loop on July 2, 1978. The data obtained during testing and the attendant operating experience gained resulted in some design changes and provided the information necessary to fully characterize system performance. Temperature excursions and deviations from preset limits of only a minor nature were encountered during preheat for sodium fill. The addition of the rate alarm feature was beneficial to operation of the preheat system and allowed early detection and correction of impending excursions

  10. Water hammer experiences in the startup and early operation of the Shearon Harris plant

    International Nuclear Information System (INIS)

    Casada, D.A.

    1987-01-01

    During the course of preoperational testing and early operation of the Shearon Harris Nuclear Power Plant, several water hammer events have occurred. A description of the events and corrective/preventive measures taken are discussed

  11. Early Reading and Concrete Operations.

    Science.gov (United States)

    Polk, Cindy L. Howes; Goldstein, David

    1980-01-01

    Indicated that early readers are more likely to be advanced in cognitive development than are nonearly-reading peers. After one year of formal reading instruction, early readers maintained their advantage in reading achievement. Measures of concrete operations were found to predict reading achievement for early and nonearly readers. (Author/DB)

  12. Operation of the tokamak fusion test reactor tritium systems during initial tritium experiments

    International Nuclear Information System (INIS)

    Anderson, J.L.; Gentile, C.; Kalish, M.; Kamperschroer, J.; Kozub, T.; LaMarche, P.; Murray, H.; Nagy, A.; Raftopoulos, S.; Rossmassler, R.; Sissingh, R.; Swanson, J.; Tulipano, F.; Viola, M.; Voorhees, D.; Walters, R.T.

    1995-01-01

    The high power D-T experiments on the tokamak fusion test reactor (TFTR) at the Princeton Plasma Physics Laboratory commenced in November 1993. During initial operation of the tritium systems a number of start-up problems surfaced and had to be corrected. These were corrected through a series of system modifications and upgrades and by repair of failed or inadequate components. Even as these operational concerns were being addressed, the tritium systems continued to support D-T operations on the tokamak. During the first six months of D-T operations more than 107kCi of tritium were processed successfully by the tritium systems. D-T experiments conducted at TFTR during this period provided significant new data. Fusion power in excess of 9MW was achieved in May 1994. This paper describes some of the early start-up issues, and reports on the operation of the tritium system and the tritium tracking and accounting system during the early phase of TFTR D-T experiments. (orig.)

  13. Long-term operating experience for the ATLAS superconducting resonators

    International Nuclear Information System (INIS)

    Pardo, R.; Zinkann, G.

    1999-01-01

    Portions of the ATLAS accelerator have been operating now for over 21 years. The facility has accumulated several million resonator-hours of operation at this point and has demonstrated the long-term reliability of RF superconductivity. The overall operating performance of the ATLAS facility has established a level of beam quality, flexibility, and reliability not previously achieved with heavy-ion accelerator facilities. The actual operating experience and maintenance history of ATLAS are presented for ATLAS resonators and associated electronics systems. Solutions to problems that appeared in early operation as well as current problems needing further development are discussed

  14. Brachytherapy in early prostate cancer--early experience.

    Science.gov (United States)

    Jose, B O; Bailen, J L; Albrink, F H; Steinbock, G S; Cornett, M S; Benson, D C; Schmied, W K; Medley, R N; Spanos, W J; Paris, K J; Koerner, P D; Gatenby, R A; Wilson, D L; Meyer, R

    1999-01-01

    Use of brachytherapy with radioactive seeds in the management of early prostate cancer is commonly used in the United States. The early experience has been reported from the prostate treatment centers in Seattle for the last 10 years. In this manuscript we are reporting our early experience of 150 radioactive seed implantations in early stage prostate cancer using either Iodine 125 or Palladium 103 seeds. The average age of the patient is 66 years and the median Gleason score is 5.4 with a median PSA of 6. A brief description of the evolution of the treatment of prostate cancer as well as the preparation for the seed implantation using the volume study with ultrasound of the prostate, pubic arch study using CT scan of the pelvis and the complete planning using the treatment planning computers are discussed. We also have described the current technique which is used in our experience based on the Seattle guidelines. We plan a follow-up report with the results of the studies with longer follow-up.

  15. Applying operating experience to design the CANDU 3 process

    International Nuclear Information System (INIS)

    Harris, D.S.; Hinchley, E.M.; Pauksens, J.; Snell, V.; Yu, S.K.W.

    1991-01-01

    The CANDU 3 is an advanced, smaller (450 MWe), standardized version of the CANDU now being designed for service later in the decade and beyond. The design of this evolutionary nuclear power plant has been carefully planned and organized to gain maximum benefits from new technologies and from world experience to date in designing, building, commissioning and operating nuclear power stations. The good performance record of existing CANDU reactors makes consideration of operating experience from these plants a particularly vital component of the design process. Since the completion of the first four CANDU 6 stations in the early 1980s, and with the continuing evolution of the multi-unit CANDU station designs since then, AECL CANDU has devised several processes to ensure that such feedback is made available to designers. An important step was made in 1986 when a task force was set up to review and process ideas arising from the commissioning and early operation of the CANDU 6 reactors which were, by that time, operating successfully in Argentina and Korea, as well as the Canadian provinces of Quebec and New Brunswick. The task force issued a comprehensive report which, although aimed at the design of an improved CANDU 6 station, was made available to the CANDU 3 team. By that time also, the Institute of Power Operations (INPO) in the U.S., of which AECL is a Supplier Participant member, was starting to publish Good Practices and Guidelines related to the review and the use of operating experiences. In addition, details of significant events were being made available via the INPO SEE-IN (Significant Event Evaluation and Information Network) Program, and subsequently the CANNET network of the CANDU Owners' Group (COG). Systematic review was thus possible by designers of operations reports, significant event reports, and related documents in a continuing program of design improvement. Another method of incorporating operations feedback is to involve experienced utility

  16. Applying operating experience to design the CANDU 3 process

    Energy Technology Data Exchange (ETDEWEB)

    Harris, D S; Hinchley, E M; Pauksens, J; Snell, V; Yu, S K.W. [AECL-CANDU, Ontario (Canada)

    1991-04-01

    The CANDU 3 is an advanced, smaller (450 MWe), standardized version of the CANDU now being designed for service later in the decade and beyond. The design of this evolutionary nuclear power plant has been carefully planned and organized to gain maximum benefits from new technologies and from world experience to date in designing, building, commissioning and operating nuclear power stations. The good performance record of existing CANDU reactors makes consideration of operating experience from these plants a particularly vital component of the design process. Since the completion of the first four CANDU 6 stations in the early 1980s, and with the continuing evolution of the multi-unit CANDU station designs since then, AECL CANDU has devised several processes to ensure that such feedback is made available to designers. An important step was made in 1986 when a task force was set up to review and process ideas arising from the commissioning and early operation of the CANDU 6 reactors which were, by that time, operating successfully in Argentina and Korea, as well as the Canadian provinces of Quebec and New Brunswick. The task force issued a comprehensive report which, although aimed at the design of an improved CANDU 6 station, was made available to the CANDU 3 team. By that time also, the Institute of Power Operations (INPO) in the U.S., of which AECL is a Supplier Participant member, was starting to publish Good Practices and Guidelines related to the review and the use of operating experiences. In addition, details of significant events were being made available via the INPO SEE-IN (Significant Event Evaluation and Information Network) Program, and subsequently the CANNET network of the CANDU Owners' Group (COG). Systematic review was thus possible by designers of operations reports, significant event reports, and related documents in a continuing program of design improvement. Another method of incorporating operations feedback is to involve experienced utility

  17. Managing the early termination of operation of nuclear power plants

    International Nuclear Information System (INIS)

    2003-01-01

    The International Atomic Energy Agency (IAEA) has the statutory mandate to seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world. However, it has become more and more apparent that many States are facing the decision of closing nuclear power plants (NPPs) before expiration of their operating licences. Some NPPs have already closed and the owners are evaluating the effects on their staffs, the local economies and safety at the sites. It is evident that safety aspects and management strategies are important factors to be reviewed and monitored throughout the process of early termination and closure.The owners and employees of the NPPs are realizing that they are entering into very difficult phases of the plant life cycle with significant safety concerns. Although a great deal of work has been done to review and process information on technical aspects of early termination prior to decommissioning, far less attention has been given to the management and organizational issues involved in maintaining the required safety level in such nuclear installations. It is important that when decisions are made to terminate operation early, the same safety measures are applied to management concerns for strategic planning as are applied to technical reviews. These management and organizational issues are fundamental to any future decommissioning process. Managers at sites that decided to close early may be working to cope with management of change issues arising during the transition from operation to decommissioning as they monitor resource and competence needs, as well as staff morale and technical issues. If these issues are not treated satisfactorily they can have significant safety consequences. The organization often must address all these challenges with little guidance or experience and with reduced resources. This Safety Report has been developed with the support of experts from regulatory, operating and

  18. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.; Thurygill, E.W.

    1980-05-01

    The CANDU-PHW program is based upon 38 years of heavy water reactor experience with 35 years of operating experience. Canada has had 72 reactor years of nuclear-electric operations experience with 10 nuclear units in 4 generating stations during a period of 18 years. All objectives have been met with outstanding performance: worker safety, public safety, environmental emissions, reliable electricity production, and low electricity cost. The achievement has been realized through total teamwork involving all scientific disciplines and all project functions (research, design, manufacturing, construction, and operation). (auth)

  19. Operative technique and early experience for robotic-assisted laparoscopic nephroureterectomy (RALNU) using da Vinci Xi.

    Science.gov (United States)

    Darwiche, Fadi; Swain, Sanjaya; Kallingal, George; Punnen, Sanoj; Manoharan, Murugesan; Parekh, Dipen J; Gonzalgo, Mark L

    2015-01-01

    Robotic-assisted laparoscopic nephroureterectomy (RALNU) has been previously utilized for management of upper tract urothelial carcinoma. The da Vinci Xi surgical system was released in April of 2014. We describe our operative technique and early experience for RALNU using the da Vinci Xi system highlighting unique features of this surgical platform. A total of 10 patients with a diagnosis of upper tract urothelial carcinoma underwent RALNU using the da Vinci Xi system between April and November of 2014. A novel, oblique "in line" robotic trocar configuration was utilized to access the upper abdomen (nephrectomy portion) and pelvis (bladder cuff excision) without undocking. The port hopping feature of da Vinci Xi was utilized to facilitate optimal, multi-quadrant visualization during RALNU. Robotic-assisted laparoscopic nephroureterectomy was successfully completed without open conversion in all 10 patients. Mean operative time was 184 min (range 140-300 min), mean estimated blood loss was 121 cc (range 60-300 cc), and mean hospital stay was 2.4 days. Final pathology demonstrated high grade urothelial carcinoma in all patients. Surgical margins were negative in all patients. No intra-operative complications were encountered. One patient developed a pulmonary embolus after being discharged. No patients required a blood transfusion. Mean patient follow-up was 130 days (range 15-210 days). The use of da Vinci Xi with a novel, oblique "in line" port configuration and camera port hopping technique allows for an efficient and reproducible method for RALNU without the need for repositioning the patient or the robot during surgery.

  20. Operational and reliability experience with reactor instrumentation

    International Nuclear Information System (INIS)

    Dixon, F.; Gow, R.S.

    1978-01-01

    In the last 15 years the CEGB has experienced progressive plant development, integration and changes in operating regime through nine nuclear (gas-cooled reactor) power stations with corresponding instrumentation advances leading towards more refined centralized control. Operation and reliability experience with reactor instrumentation is reported in this paper with reference to the progressive changes related to the early magnox, late magnox and AGR periods. Data on instrumentation reliability in terms of reactor forced outages are presented and show that the instrumentation contributions to loss of generating plant availability are small. Reactor safety circuits, neutron flux and temperature measurements, gas analysis and vibration monitoring are discussed. In reviewing the reactor instrumentation the emphasis is on reporting recent experience, particularly on AGR equipment, but overall performance and changes to magnox equipment are included so that some appreciation can be obtained of instrumentation requirements with respect to plant lifetimes. (author)

  1. The Advanced Photon Source: Performance and results from early operation

    International Nuclear Information System (INIS)

    Moncton, D.E.

    1997-01-01

    The Advanced Photon Source at Argonne National Laboratory is now providing researchers with extreme-brilliance undulator radiation in the hard x-ray region of the spectrum. All technical facilities and components are operational and have met design specifications. Fourteen research teams, occupying 20 sectors on the APS experiment hall floor, are currently installing beamline instrumentation or actively taking data. An overview is presented for the first operational years of the Advanced Photon Source. Emphasis is on the performance of accelerators and insertion devices, as well as early scientific results and future plans

  2. Operational safety experience feedback by means of unusual event reports

    International Nuclear Information System (INIS)

    1996-07-01

    Operational experience of nuclear power plants can be used to great advantage to enhance safety performance provided adequate measures are in place to collect and analyse it and to ensure that the conclusions drawn are acted upon. Feedback of operating experience is thus an extremely important tool to ensure high standards of safety in operational nuclear power plants and to improve the capability to prevent serious accidents and to learn from minor deviations and equipment failures - which can serve as early warnings -to prevent even minor events from occurring. Mechanisms also need to be developed to ensure that operating experience is shared both nationally as well as internationally. The operating experience feedback process needs to be fully and effectively established within the nuclear power plant, the utility, the regulatory organization as well as in other institutions such as technical support organizations and designers. The main purpose of this publication is to reflect the international consensus as to the general principles and practices in the operational safety experience feedback process. The examples of national practices for the whole or for particular parts of the process are given in annexes. The publication complements the IAEA Safety Series No.93 ''Systems for Reporting Unusual Events in Nuclear Power Plants'' (1989) and may also give a general guidance for Member States in fulfilling their obligations stipulated in the Nuclear Safety Convention. Figs, tabs

  3. Operational safety experience feedback by means of unusual event reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Operational experience of nuclear power plants can be used to great advantage to enhance safety performance provided adequate measures are in place to collect and analyse it and to ensure that the conclusions drawn are acted upon. Feedback of operating experience is thus an extremely important tool to ensure high standards of safety in operational nuclear power plants and to improve the capability to prevent serious accidents and to learn from minor deviations and equipment failures - which can serve as early warnings -to prevent even minor events from occurring. Mechanisms also need to be developed to ensure that operating experience is shared both nationally as well as internationally. The operating experience feedback process needs to be fully and effectively established within the nuclear power plant, the utility, the regulatory organization as well as in other institutions such as technical support organizations and designers. The main purpose of this publication is to reflect the international consensus as to the general principles and practices in the operational safety experience feedback process. The examples of national practices for the whole or for particular parts of the process are given in annexes. The publication complements the IAEA Safety Series No.93 ``Systems for Reporting Unusual Events in Nuclear Power Plants`` (1989) and may also give a general guidance for Member States in fulfilling their obligations stipulated in the Nuclear Safety Convention. Figs, tabs.

  4. Operating experience feedback

    International Nuclear Information System (INIS)

    Cimesa, S.

    2007-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed its own system for tracking, screening and evaluating the operating experiences of the nuclear installations. The SNSA staff regularly tracks the operating experiences throughout the world and screens them on the bases of applicability for the Slovenian nuclear facilities. The operating experiences, which pass the screening, are thoroughly evaluated and also recent operational events in these facilities are taken into account. If needed, more information is gathered to evaluate the conditions of the Slovenian facilities and appropriate corrective actions are considered. The result might be the identification of the need for modification at the licensee, the need for modification of internal procedures in the SNSA or even the proposal for the modification of regulations. Information system helps everybody to track the process of evaluation and proper logging of activities. (author)

  5. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  6. Early and long-term results of a valve-sparing operation for Marfan syndrome.

    Science.gov (United States)

    Birks, E J; Webb, C; Child, A; Radley-Smith, R; Yacoub, M H

    1999-11-09

    We have previously described the experience, rationale, and development of a valve preserving technique, but its role in patients with Marfan syndrome has not previously been defined. Here, we attempt to determine the early and long-term results, timing, and determinants of outcome of this operation in patients with Marfan syndrome. Since 1979, 82 patients (73.2% of all patients with Marfan syndrome undergoing resection of aneurysm of the ascending aorta) were operated on using this technique. Ages ranged from 2 to 69 years (mean, 33.9 years). In all, there were 4 early deaths (4.9%), 2 with acute dissection and 2 with chronic aneurysm operated on as emergencies. There were no early deaths in 67 patients operated on electively. Actuarial survival for patients operated for chronic aneurysm was 94.2%, 94.2%, and 94.2% at 1, 5, and 10 years, respectively; that for acute dissection was 72.7%, 63. 6%, and 63.6%; and that for chronic dissection was 100%, 85.7%, and 75.0%. The probability of needing reoperation was 5.7%, 17.3%, and 17.3% at 1, 5, and 10 years. There were no instances of infective endocarditis or thromboembolic complications except in 2 patients operated on early in the series who had cusp extension. At the end of the follow-up, trivial or no aortic regurgitation was demonstrated in 33.3%, mild in 45.6%, moderate in 21.1%, and severe in 0. Valve-sparing operations are feasible in most patients with Marfan syndrome; they are applicable to patients with both dissection and chronic aneurysm. The early and long-term results are encouraging. Results are better in the absence of dissection, and prophylactic operation is warranted in some cases.

  7. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1985-01-01

    Experiments are being conducted on nuclear power plant (NPP) control room training simulators by the Oak Ridge National Laboratory, its subcontractor, General Physics Corporation, and participating utilities. The experiments are sponsored by the Nuclear Regulatory Commission's (NRC) Human Factors and Safeguards Branch, Division of Risk Analysis and Operations, and are a continuation of prior research using simulators, supported by field data collection, to provide a technical basis for NRC human factors regulatory issues concerned with the operational safety of nuclear power plants. During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE boiling water reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of (a) senior reactor operator (SRO) experience, (b) operating crew augmentation with an STA and (c) practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator. Methodology and results to date are reported

  8. Recent U.S. reactor operating experience

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1977-01-01

    A qualitative assessment of U.S. and foreign reactor operating experience is provided. Recent operating occurrences having potentially significant safety impacts on power operation are described. An evaluation of the seriousness of each of these issues and the plans for resolution is discussed. A quantitative report on U.S. reactor operational experience is included. The details of the NRC program for evaluating and applying operating reactor experience in the regulatory process is discussed. A review is made of the adequacy of operating reactor safety and environmental margins based on actual operating experience. The Regulatory response philosophy to operating reactor experiences is detailed. This discussion indicates the NRC emphasis on the importance of a balanced action plan to provide for the protection of public safety in the national interest

  9. Operating experience feedback in TVO

    Energy Technology Data Exchange (ETDEWEB)

    Piirto, A [Teollisuuden Voima Oy (Finland)

    1997-12-31

    TVO is a power company operating with two 710 MW BWR units at Olkiluoto. For operating experience feedback TVO has not established a separate organizational unit but rather relies on a group of persons representing various technical disciplines. The ``Operating Experience Group`` meets at about three-week intervals to handle the reports of events (in plant and external) which have been selected for handling by an engineer responsible for experience feedback. 7 charts.

  10. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  11. Regulatory challenges in using nuclear operating experience

    International Nuclear Information System (INIS)

    2006-01-01

    There can be no doubt that the systematic evaluation of operating experience by the operator and the regulator is essential for continued safe operation of nuclear power plants. Recent concerns have been voiced that the operating experience information and insights are not being used effectively to promote safety. If these concerns foreshadow a real trend in OECD countries toward complacency in reporting and analysing operating events and taking corrective actions, then past experience suggests that similar or even more serious events will recur. This report discusses how the regulator can take actions to assure that operators have effective programmes to collect and analyse operating experience and, just as important, for taking steps to follow up with actions to prevent the events and conditions from recurring. These regulatory actions include special inspections of an operator operating experience programme and discussion with senior plant managers to emphasize the importance of having an effective operating experience programme. In addition to overseeing the operator programmes, the regulator has the broader responsibility for assuring that industry-wide trends, both national and international are monitored. To meet these responsibilities, the regulatory body must have its own operating experience programme, and this report discusses the important attributes of such regulatory programmes. It is especially important for the regulator to have the capability for assessing the full scope of operating experience issues, including those that may not be included in an operator operating experience programme, such as new research results, international operating experience, and broad industry trend information. (author)

  12. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1984-01-01

    During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE Boiling Water Reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of senior reactor operator (SRO) experience, operating crew augmentation with an STA and practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. Sixteen two-man crews of licensed operators were employed in a 2 x 2 factorial design. The SROs leading the crews were split into high and low experience groups on the basis of their years of experience as an SRO. One half of the high- and low-SRO experience groups were assisted by an STA. The crews responded to four simulated plant casualties. A five-variable set of content-referenced performance measures was derived from task analyses of the procedurally correct responses to the four casualties. System parameters and control manipulations were recorded by the computer controlling the simulator. Data on communications and procedure use were obtained from analysis of videotapes of the exercises. Questionnaires were used to collect subject biographical information and data on subjective workload during each simulated casualty. For four of the five performance measures, no significant differences were found between groups led by high (25 to 114 months) and low (1 to 17 months as an SRO) experience SROs. However, crews led by low experience SROs tended to have significantly shorter task performance times than crews led by high experience SROs. The presence of the STA had no significant effect on overall team performance in responding to the four simulated casualties. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator

  13. Operating experience with the new TRIUMF RF control system

    International Nuclear Information System (INIS)

    Fong, K.; Laverty, M.; Fang, S.

    1995-06-01

    The 23 MHz rf control of the TRIUMF cyclotron has been replaced by a new VXI control system based on digital signal processing. It provides amplitude and phase regulation of the cyclotron dee voltage, as well as other functions such as power-up sequencing, spark and high VSWR protection. Modularity of the hardware is achieved by the VXI architecture, and in the software by Object Oriented Programming. It is expected that this will result in a considerably longer MTBF, and shorter fault diagnosis and repair times, than the equipment it replaces. The new system has now been in operation for over two months. The results of commissioning, testing, and early operating experience are presented. (author). 4 refs., 5 figs

  14. Correlates of Bulimia Nervosa: Early Family Mealtime Experiences.

    Science.gov (United States)

    Miller, Debra A. F.; And Others

    1993-01-01

    Examined relationship of early mealtime experiences to later bulimia in 128 female college students. Found significant group differences among bulimics, nonbulimics, and repeat dieters on early meal experience questionnaire, with bulimic group reporting most negative and unusual experiences. Found significant differences among groups on depression…

  15. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.

    1982-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This paper highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations both to the workers and the public

  16. Industry Operating Experience Process at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Bozin, B.; Cizmek, R.

    2012-01-01

    Experience has shown that number of minor events and near misses, usually without immediate or significant impact to plant safety and reliability, are precursors of significant or severe events due to the same or similar root or apparent cause(s). It is therefore desirable to identify and analyze weaknesses of the precursor problems (events) in order to prevent occurrence of significant events. Theoretically, significant events could be prevented from occurring if the root cause(s) of these precursor problems could be identified and eliminated. The Operating Experience Program identifies such event precursors and by reporting them to the industry, plant specific corrective actions can be taken to prevent events at other operational plants. The intent of the Operating Experience Program is therefore to improve nuclear power plant safety and reliability of the operating nuclear power plants. Each plant develops its own Operating Experience Program in order to learn from the in-house operating experience as well as from the world community of nuclear plants. The effective use of operating experience includes analyzing both plant and industry events in order to identify fundamental weaknesses and then determining appropriate plant-specific actions that will minimize the likelihood of similar events. Learning and applying the lessons from operating experience is an integral part of station safety culture and is encouraged by managers throughout the top plant administrative programs and procedures. Krsko NPP is developed it own Operating Experience Program by using the most relevant INPO/WANO/IAEA guidelines as well as its own knowledge, skills an operating practice. The Operating Experience Program is a part of the Corrective Action Program, which is among top management programs, thus program is strongly encouraged by top management. The purpose of Operating Experience Program is to provide guidance for using, sharing, and evaluating operating experience information

  17. Early operating and reliability experience with the CEBAF DC magnet power supplies

    International Nuclear Information System (INIS)

    Merz, W.; Flood, R.; Martin, E.J.; O'Sullivan, M.

    1996-01-01

    The CEBAF accelerator is a five pass, recirculating, CW electron linear accelerator. There are a total of nine recirculation arcs connecting the two linacs. Three experimental halls are serviced by the accelerator through separate transport channels. The magnet powering system for CEBAF consists of approximately 2000 independent control channels. About 1850 of these channels are low current, trim magnet power supplies. There are 28 higher power supplies used to energize the major bending elements. Over one hundred, 20 amp, active shunts are used to vary current in selected magnets in the major dipole strings. The majority of the magnetic elements are concentrated in the arcs and transport channels. The correction dipoles, quadrupoles and sextupoles are each powered individually be a dedicated trim power supply channel. The arc and extraction channel dipoles are powered in series strings by the high powered supplies, known locally at CEBAF as 'box power supplies'. Arc loads consist of some 30--40 magnets in series. Transport channel, path length control doglegs and septa box power supplies have loads ranging from 1 to 10 magnets. Shunts are installed on virtually all loads where two or more magnets are in series. At this time, 95% of the power supplies are installed and commissioned. In the past twelve months, beginning in May 1994, approximately 1200 trim magnet power supplies have been checked out. During this same period approximately 22 box power supplies and 100 shunts have been made operational. Full operation of the equipment has only been under way since early 1995. While this operation is only just beginning, much has been learned based on the reliability performance seen so far. The remainder of this paper describes the systems mentioned, their reliability problems, the fixes implemented to date, and some plans for the future. 6 refs., 3 tabs

  18. Combining risk analysis and operating experience

    International Nuclear Information System (INIS)

    1986-10-01

    In recent years there has been an increasing interest in the systematic utilization of operating experience in the decision making process concerning large industrial facilities. Even before the advent of Probabilistic Safety Assessment (PSA), operating experience had always played an important role in such decisions. Of course, operating experience has always been an input to PSA also; however, as PSA becomes more mature and the quality and quantity of operating experience improve, greater emphasis is now being placed on the use of operating experience to update and validate PSA and thereby provide a more rational basis for decision making. This report outlines the ways in which data are collected, processed using mathematical techniques and utilized in decision making. It is not intended to provide details of the methods and procedures to be used in these areas, but is rather intended as an introduction to these topics and some of the relevant literature. The meeting presentations were divided into three sessions devoted to the following topics: evaluation of nuclear power plants operational experience (5 papers); uncertainties (2 papers); probabilistic safety assessment studies in Member States (7 papers). A separate abstract was prepared for each of these papers

  19. ERB-II operating experience

    International Nuclear Information System (INIS)

    Smith, R.N.; Cissel, D.W.; Smith, R.R.

    1977-01-01

    As originally designed and operated, EBR-II successfully demonstrated the concept of a sodium-cooled fast breeder power plant with a closed fuel reprocessing cycle (mini-nuclear park). Subsequent operation has been as an irradiation facility, a role which will continue into the foreseeable future. Since the beginning of operation in 1961, operating experience of EBR-II has been very satisfactory. Most of the components and systems have performed well. In particular, the mechanical performance of heat-removal systems has been excellent. A review of the operating experience reveals that all the original design objectives have been successfully demonstrated. To date, no failures or incidents resulting in serious in-core or out-of-core consequences have occurred. No water-to-sodium leaks have been detected over the life of the plant. At the present time, the facility is operating very well and continuously except for short shutdowns required by maintenance, refueling, modification, and minor repair. A plant factor of 76.9% was achieved for the calendar year 1976

  20. Operating experience: safety perspective

    International Nuclear Information System (INIS)

    Piplani, Vivek; Krishnamurthy, P.R.; Kumar, Neeraj; Upadhyay, Devendra

    2015-01-01

    Operating Experience (OE) provides valuable information for improving NPP safety. This may include events, precursors, deviations, deficiencies, problems, new insights to safety, good practices, lessons and corrective actions. As per INSAG-10, an OE program caters as a fundamental means for enhancing the defence-in-depth at NPPs and hence should be viewed as ‘Continuous Safety Performance Improvement Tool’. The ‘Convention on Nuclear Safety’ also recognizes the OE as a tool of high importance for enhancing the NPP safety and its Article 19 mandates each contracting party to establish an effective OE program at operating NPPs. The lessons drawn from major accidents at Three Mile Island, Chernobyl and Fukushima Daiichi NPPs had prompted nuclear stalwarts to change their safety perspective towards NPPs and to frame sound policies on issues like safety culture, severe accident prevention and mitigation. An effective OE program, besides correcting current/potential problems, help in proactively improving the NPP design, operating and maintenance procedures, practices, training, etc., and thus plays vital role in ensuring safe and efficient operation of NPPs. Further it enhances knowledge with regard to equipment operating characteristics, system performance trends and provides data for quantitative and qualitative safety analysis. Besides all above, an OE program inculcates a learning culture in the organisation and thus helps in continuously enhancing the expertise, technical competency and knowledge base of its staff. Nuclear and Radiation Facilities in India are regulated by Atomic Energy Regulatory Board (AERB). Operating Plants Safety Division (OPSD) of AERB is involved in managing operating experience activities. This paper provides insights about the operating experience program of OPSD, AERB (including its on-line data base namely OPSD STAR) and its utilisation in improving the regulations and safety at Indian NPPs/projects. (author)

  1. Operating experience feedback program at Olkiluoto NPP

    International Nuclear Information System (INIS)

    Kosonen, Mikko

    2002-01-01

    Recent review and development of the operating experience feedback program will be described. The development of the program has been based on several reviews by outside organizations. Main conclusions from these review reports and from the self assessment of safety performance, safety problems and safety culture on the basis of the operational events made by ASSET-method will be described. An approach to gather and analyze small events - so-called near misses - will be described. The operating experience program has been divided into internal and external operating experience. ASSET-methodology and a computer program assisting the analysis are used for the internal operating experience events. Noteworthy incidents occurred during outage are analyzed also by ASSET-method. Screening and pre analysis of the external operating experience relies on co-operation with ERFATOM, an organization of Nordic utilities for the exchange of nuclear industry experience. A short presentation on the performance of the Olkiluoto units will conclude the presentation. (author)

  2. Experience with early postoperative feeding after abdominal aortic surgery.

    Science.gov (United States)

    Ko, Po-Jen; Hsieh, Hung-Chang; Liu, Yun-Hen; Liu, Hui-Ping

    2004-03-01

    Abdominal aortic surgery is a form of major vascular surgery, which traditionally involves long hospital stays and significant postoperative morbidity. Experiences with transit ileus are often encountered after the aortic surgery. Thus traditional postoperative care involves delayed oral feeding until the patients regain their normal bowel activities. This report examines the feasibility of early postoperative feeding after abdominal aortic aneurysm (AAA) open-repair. From May 2002 through May 2003, 10 consecutive patients with infrarenal AAA who underwent elective surgical open-repair by the same surgeon in our department were reviewed. All of them had been operated upon and cared for according to the early feeding postoperative care protocol, which comprised of adjuvant epidural anesthesia, postoperative patient controlled analgesia, early postoperative feeding and early rehabilitation. The postoperative recovery and length of hospital stay were reviewed and analyzed. All patients were able to sip water within 1 day postoperatively without trouble (Average; 12.4 hours postoperatively). All but one patient was put on regular diet within 3 days postoperatively (Average; 2.2 days postoperatively). The average postoperative length of stay in hospital was 5.8 days. No patient died or had major morbidity. Early postoperative feeding after open repair of abdominal aorta is safe and feasible. The postoperative recovery could be improved and the length of stay reduced by simply using adjuvant epidural anesthesia during surgery, postoperative epidural patient-controlled analgesia, early feeding, early ambulation, and early rehabilitation. The initial success of our postoperative recovery program of aortic repair was demonstrated.

  3. Operating experience

    International Nuclear Information System (INIS)

    McRae, L.P.; Six, D.E.

    1991-01-01

    In 1987, Westinghouse Hanford Company began operating a first-generation integrated safeguards system in the Plutonium Finishing Plant storage vaults. This Vault Safety and Inventory System is designed to integrate data into a computer-based nuclear material inventory monitoring system. The system gathers, in real time, measured physical parameters that generate nuclear material inventory status data for thousands of stored items and sends tailored report to the appropriate users. These data include canister temperature an bulge data reported to Plant Operations and Material Control and Accountability personnel, item presence and identification data reported to Material Control and Accountability personnel, and unauthorized item movement data reported to Security response forces and Material Control and Accountability personnel. The Westinghouse Hanford Company's experience and operational benefits in using this system for reduce radiation exposure, increase protection against insider threat, and real-time inventory control are discussed in this paper

  4. Operating experience with snubbers

    International Nuclear Information System (INIS)

    Levin, H.; Cudlin, R.

    1978-06-01

    Recent operating experience with hydraulic and mechanical snubbers has indicated that there is a need to evaluate current practice in the industry associated with snubber qualification testing programs, design and analysis procedures, selection and specification criteria, and the preservice inspection and inservice surveillance programs. The report provides a summary of operational experiences that represent problems that are generic throughout the industry. Generic Task A-13 is part of the NRC Program for the Resolution of Generic Issues Related to Nuclear Power Plants described in NUREG-0410. The report is based upon a rather large amount of data that have become available in the past four years. These data have been evaluated by the Division of Operating Reactors to develop a data base for use in connection with several NRC activities including Category A, Technical Activity A-13 (Snubbers); the Standard Review Plan; future Regulatory Guides; ASME Code Provisions; and various technical specifications of operating nuclear power plants

  5. Parental experiences of early postnatal discharge

    DEFF Research Database (Denmark)

    Nilsson, Ingrid; Danbjørg, Dorthe B.; Aagaard, Hanne

    2015-01-01

    that included both parents, having influence on time of discharge, and getting individualised and available support focused on developing and recognising their own experiences of taking care of the baby. Conclusions and implications for practice the new parents׳ experiences of early discharge and becoming...

  6. 14 CFR 121.434 - Operating experience, operating cycles, and consolidation of knowledge and skills.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Operating experience, operating cycles, and... Qualifications § 121.434 Operating experience, operating cycles, and consolidation of knowledge and skills. (a... position, the operating experience, operating cycles, and the line operating flight time for consolidation...

  7. Chinese characters reveal impacts of prior experience on very early stages of perception

    Directory of Open Access Journals (Sweden)

    Stollhoff Rainer

    2011-01-01

    Full Text Available Abstract Background Visual perception is strongly determined by accumulated experience with the world, which has been shown for shape, color, and position perception, in the field of visuomotor learning, and in neural computation. In addition, visual perception is tuned to statistics of natural scenes. Such prior experience is modulated by neuronal top-down control the temporal properties of which had been subject to recent studies. Here, we deal with these temporal properties and address the question how early in time accumulated past experience can modulate visual perception. Results We performed stimulus discrimination experiments and compared a group of Chinese participants with a German control group. The perception of our briefly presented visual objects (targets was disturbed by masking stimuli which appeared in close spatiotemporal proximity. These masking stimuli were either intact or scrambled Chinese characters and did not overlap with the targets. In contrast to German controls, Chinese participants show substantial performance differences for real versus scrambled Chinese characters if these masking stimuli were presented as early as less than 100 milliseconds after the onset of the target. For Chinese observers, it even occured that meaningful masking stimuli enhanced target identification if they were shown at least 100 milliseconds after target onset while the same stimuli impaired recognition if presented in close temporal proximity to the target. The latter finding challenges interpretations of our data that solely rely on stimulus contours or geometric properties and emphasizes the impact of prior experience on the very early temporal dynamics of the visual system. Conclusions Our findings demonstrate that prior experience which had been accummulated long before the experiments can modulate the time course of perception intriguingly early, namely already immediately after the perceptual onset of a visual event. This modulation

  8. Operating experience review for the AP1000 plant

    International Nuclear Information System (INIS)

    Chaney, T. E.; Lipner, M. H.

    2006-01-01

    Westinghouse is performing an update to the Operating Experience Review (OER) Report for the AP1000 project to account for operating experience since December 1996. Significant Operating Experience Reports, Significant Event Reports, Significant Event Notifications, Operations and Maintenance Reminders, Topical Reports, Event Analysis Reports and Licensee Event Reports were researched for pertinent input to the update. As a part of the OER, Westinghouse has also conducted operator interviews and observations during simulated plant operations and after operating events. The main purpose of the OER is to identify Human Factors Engineering (HFE) related safety issues from existing operating plant experience and to ensure that these issues are addressed in the new design. The issues and lessons learned regarding operating experience provide a basis for improving the plant design. (authors)

  9. Development of reliability database for safety-related I and C component based on operating experience of KSNP

    International Nuclear Information System (INIS)

    Jang, S. C.; Han, S. H.; Min, K. R.

    2001-01-01

    Reliability database for safety-related I and C components has been developed, based on domestic operating experience of total 8.63 years from four units-Yonggwang Units 3 and 4, and Ulchin Units 3 and 4. This plant-specific data of safety-related I and C components has compared with operating experience for CE-supplied plants in U.S.A. As a results, we found that on the whole the domestic reliability data was similar to CE-supplied plants in USA, through lots of failures occurred early in the commercial operation were included in our analyses without percolation

  10. Challenges for operational forecasting and early warning of rainfall induced landslides

    Science.gov (United States)

    Guzzetti, Fausto

    2017-04-01

    models. Building on the experience gained in designing, implementing, and operating national and regional landslide forecasting systems in Italy, and on a preliminary review of the existing literature on regional landslide early warning systems, the talk discusses concepts, limitations and challenges inherent to the design of reliable forecasting and early warning systems for rainfall-triggered landslides, the evaluation of the performances of the systems, and on problems related to the use of the forecasts and the issuing of landslide warnings. Several of the typical elements of an operational landslide forecasting system are considered, including: (i) the rainfall and landslide information used to establish the threshold models, (ii) the methods and tools used to define the empirical rainfall thresholds, and their associated uncertainty, (iii) the quality (e.g., the temporal and spatial resolution) of the rainfall information used for operational forecasting, including rain gauge and radar measurements, satellite estimates, and quantitative weather forecasts, (iv) the ancillary information used to prepare the forecasts, including e.g., the terrain subdivisions and the landslide susceptibility zonations, (v) the criteria used to transform the forecasts into landslide warnings and the methods used to communicate the warnings, and (vi) the criteria and strategies adopted to evaluate the performances of the systems, and to define minimum or optimal performance levels.

  11. ATLAS IBL operational experience

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00237659; The ATLAS collaboration

    2017-01-01

    The Insertable B-Layer (IBL) is the inner most pixel layer in the ATLAS experiment, which was installed at 3.3 cm radius from the beam axis in 2014 to improve the tracking performance. To cope with the high radiation and hit occupancy due to proximity to the interaction point, a new read-out chip and two different silicon sensor technologies (planar and 3D) have been developed for the IBL. After the long shut-down period over 2013 and 2014, the ATLAS experiment started data-taking in May 2015 for Run-2 of the Large Hadron Collider (LHC). The IBL has been operated successfully since the beginning of Run-2 and shows excellent performance with the low dead module fraction, high data-taking efficiency and improved tracking capability. The experience and challenges in the operation of the IBL is described as well as its performance.

  12. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4-8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  13. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000 kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4 -8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear , plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  14. Regulatory challenges in using nuclear operating experience

    International Nuclear Information System (INIS)

    2006-01-01

    The fundamental objective of all nuclear safety regulatory bodies is to ensure that nuclear utilities operate their plants in an acceptably safe manner at all times. Learning from experience has been a key element in meeting this objective. It is therefore very important for nuclear power plant operators to have an active programme for collecting, analysing and acting on the lessons of operating experience that could affect the safety of their plants. NEA experts have noted that almost all of the recent, significant events reported at international meetings have occurred earlier in one form or another. Counteractions are usually well-known, but information does not always seem to reach end users, or corrective action programmes are not always rigorously applied. Thus, one of the challenges that needs to be met in order to maintain good operational safety performance is to ensure that operating experience is promptly reported to established reporting systems, preferably international in order to benefit from a larger base of experience, and that the lessons from operating experience are actually used to promote safety. This report focuses on how regulatory bodies can ensure that operating experience is used effectively to promote the safety of nuclear power plants. While directed at nuclear power plants, the principles in this report may apply to other nuclear facilities as well. (author)

  15. Characteristics of Early Work Experiences and Their Association with Future Employment

    Science.gov (United States)

    McDonnall, Michele Capella; O'Mally, Jamie

    2012-01-01

    Introduction: Early work experiences are a key predictor of future employment for transition-age youths with visual impairments. We investigated how specific characteristics of early work experiences influence future employment and whether the receipt of Supplemental Security Income (SSI) benefits is associated with early work experiences among…

  16. Magnet operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1991-11-01

    This report presents a review of magnet operating experiences for normal-conducting and superconducting magnets from fusion, particle accelerator, medical technology, and magnetohydrodynamics research areas. Safety relevant magnet operating experiences are presented to provide feedback on field performance of existing designs and to point out the operational safety concerns. Quantitative estimates of magnet component failure rates and accident event frequencies are also presented, based on field experience and on performance of similar components in other industries

  17. The Wonderland of Operating the ALICE Experiment

    CERN Document Server

    Augustinus, A; Pinazza, O; Rosinský, P; Lechman, M; Jirdén, L; Chochula, P

    2011-01-01

    ALICE is one of the experiments at the Large Hadron Collider (LHC), CERN, Geneva, Switzerland. Composed of 18 sub-detectors each with numerous subsystems that need to be controlled and operated in a safe and efficient way. The Detector Control System (DCS) is the key to this and has been used by detector experts with success during the commissioning of the individual detectors. During the transition from commissioning to operation, more and more tasks were transferred from detector experts to central operators. By the end of the 2010 datataking campaign, the ALICE experiment was run by a small crew of central operators, with only a single controls operator. The transition from expert to non-expert operation constituted a real challenge in terms of tools, documentation and training. A relatively high turnover and diversity in the operator crew that is specific to the HEP experiment environment (as opposed to the more stable operation crews for accelerators) made this challenge even bigger. Thi...

  18. Laparoscopic single port surgery in children using Triport: our early experience.

    Science.gov (United States)

    de Armas, Ismael A Salas; Garcia, Isabella; Pimpalwar, Ashwin

    2011-09-01

    Laparoscopy has become the gold standard technique for appendectomy and cholecystectomy. With the emergence of newer laparoscopic instruments which are roticulating and provide 7 degrees of freedom it is now possible to perform these operations through a single umbilical incision rather than the standard 3-4 incisions and thus lead to more desirable cosmetic results and less postoperative pain. The newer reticulating telescopes provide excellent exposure of the operating field and allow the operations to proceed routinely. Recently, ports [Triports (Olympus surgery)/SILS ports] especially designed for single incision laparoscopic surgery (SILS) have been developed. We herein describe our experience with laparoscopic single port appendectomies and cholecystectomies in children using the Triport. This is a retrospective cohort study of children who underwent single incision laparoscopic surgery between May 2009 and August 2010 at Texas Children's Hospital and Ben Taub General Hospital in Houston Texas by a single surgeon. Charts were reviewed for demographics, type of procedure, operative time, early or late complications, outcome and cosmetic results. Fifty-four patients underwent SILS. A total of 50 appendectomies (early or perforated) and 4 cholecystectomies were performed using this new minimally invasive approach. The average operative time for SILS/LESS appendectomy was 54 min with a range between 25 and 205 min, while operative time for SILS cholecystectomy was 156 min with a range of 75-196 min. Only small percentage (4%) of appendectomies (mostly complicated) were converted to standard laparoscopy, but none were converted to open procedure. All patients were followed up in the clinic after 3-4 weeks. No complications were noted and all patients had excellent cosmetic results. Parents were extremely satisfied with the cosmetic results. SILS/LESS is a safe, minimally invasive approach for appendectomy and cholecystectomy in children. This new approach is

  19. Consideration of early closure or continued operation of a nuclear power plant

    International Nuclear Information System (INIS)

    2006-07-01

    This publication provides information to management and executives of electrical utilities responsible for the operation of nuclear power plants who are tasked with decision making related to early closures or continued operation. This information is based on the experiences of a number of countries in addressing a spectrum of issues broader than only the economics of the operation of the plant itself. Any major decision involving changes in direction for a major investment such as a nuclear power plant has the potential to incur considerable additional costs for stakeholders. Major economic risks can be unexpectedly encountered when decisions based on a simplified economic understanding of energy options are successfully challenged on the grounds that choices and decisions have been made without accounting for some environmental, social or economic issues which are considered of prime significance to important stakeholders. Such risks include not only changes in project scope and delays in project implementation due to re-evaluations necessitated by such challenges, but risks related to the effectiveness, efficiency and safety of ongoing operations or shutdown maintenance of the nuclear power plant. Additional risks encountered at this stage are the adequacy of the decommissioning fund and the need to establish a process whereby the availability of adequate funds will be assured at the time of the final plant shutdown. This publication provides information on several of these additional issues important to key stakeholders, and on methods that allow for their assessment and consideration when developing recommendations related to early closures or continued operations of a NPP. This publication consists of two parts: Part I: Includes a discussion of the main issues for consideration, with emphasis on issues important to stakeholders in addition to plant owners. Part II: Provides an example of a basic analytical approach to the assessment of plant life cycle

  20. Loss-of-coolant accident test series TC-1 experiment operating specifications

    International Nuclear Information System (INIS)

    Yackle, T.R.

    1979-09-01

    The purpose of this document is to specify the experiment operating procedure for the test series TC-1. The effects of externally mounted cladding thermocouples on the fuel rod thermal behavior during LOCA blowdown and reflood cycles will be investigated in the test. Potential thermocouple effects include: (a) delayed DNB, (b) momentary cladding rewets following DNB, (c) premature cladding rewet during a blowdown two-phase slug period, and (d) early cladding rewet during reflood. The two-phase slug period will be controlled by momentarily opening the hot leg valve. The slug will consist of lower plenum liquid that is sent through the flow shrouds and will be designed to quench the fuel rods at a rate that is similar to the slug experienced early in the LOFT L2-2 and L2-3 tests

  1. Operating experience in reprocessing

    International Nuclear Information System (INIS)

    Schueller, W.

    1983-01-01

    Since 1953, reprocessing has accumulated 180 years of operating experience in ten plants, six of them with 41 years of operation in reprocessing oxide fuel from light water reactors. After abortive, premature attempts at what is called commercial reprocessing, which had been oriented towards the market value of recoverable uranium and plutonium, non-military reprocessing technologies have proved their technical feasibility, since 1966 on a pilot scale and since 1976 on an industrial scale. Reprocessing experience obtained on uranium metal fuel with low and medium burnups can now certainly be extrapolated to oxide fuel with high burnup and from pilot plants to industrial scale plants using the same technologies. The perspectives of waste management of the nuclear power plants operated in the Federal Republic of Germany should be viewed realistically. The technical problems still to be solved are in a balanced relationship to the benefit arising to the national economy out of nuclear power generation and can be solved in time, provided there are clearcut political boundary conditions. (orig.) [de

  2. Early wind engineering experiments in Denmark

    DEFF Research Database (Denmark)

    Larose, Guy; Franck, Niels

    1997-01-01

    A review of works by Danish wind engineers is presented to commemorate the 100th year anniversary of the first wind tunnel experiments. Pioneer tests by Irminger and Nøkkentved in "artificial" wind on scaled models are described. The early experiments aimed at measuring the surface pressure......" that governs today´s wind engineering practice and gave birth to the boundary layer wind tunnel....

  3. Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)

    International Nuclear Information System (INIS)

    Teodor, Vasile; Popa, Viorel

    1998-01-01

    The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)

  4. Kayenta advanced series compensation operational experience

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The world's first three-phase, thyristor-controlled series compensation scheme with continuously variable impedance has been introduced into a transmission system. Energized and dedicated in September 1992, the installation was placed into commercial operation in January 1993 and has provided over one year of operating experience. This paper describes the 230 kV, 330 MVAr (60 Hz) advanced series compensation (ASC) project, located in north-eastern Arizona at Kayenta Substation on the 320 km Glen Canyon-Shiprock transmission line. The paper describes operating experiences, coordination with phase shifting transformer, phase shifter failure, platform power, system disturbances, and future plans.

  5. TSTA Piping and Flame Arrestor Operating Experience Data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C.; Willms, R. Scott

    2014-10-01

    The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility operated from 1984 to 2001, running a prototype fusion fuel processing loop with ~100 grams of tritium as well as small experiments. There have been several operating experience reports written on this facility’s operation and maintenance experience. This paper describes analysis of two additional components from TSTA, small diameter gas piping that handled small amounts of tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The operating experiences and the component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  6. Experiences from site-specific landslide early warning systems

    Science.gov (United States)

    Michoud, C.; Bazin, S.; Blikra, L. H.; Derron, M.-H.; Jaboyedoff, M.

    2013-10-01

    Landslide early warning systems (EWSs) have to be implemented in areas with large risk for populations or infrastructures when classical structural remediation measures cannot be set up. This paper aims to gather experiences of existing landslide EWSs, with a special focus on practical requirements (e.g., alarm threshold values have to take into account the smallest detectable signal levels of deployed sensors before being established) and specific issues when dealing with system implementations. Within the framework of the SafeLand European project, a questionnaire was sent to about one-hundred institutions in charge of landslide management. Finally, we interpreted answers from experts belonging to 14 operational units related to 23 monitored landslides. Although no standard requirements exist for designing and operating EWSs, this review highlights some key elements, such as the importance of pre-investigation work, the redundancy and robustness of monitoring systems, the establishment of different scenarios adapted to gradual increasing of alert levels, and the necessity of confidence and trust between local populations and scientists. Moreover, it also confirms the need to improve our capabilities for failure forecasting, monitoring techniques and integration of water processes into landslide conceptual models.

  7. Implementing Business Process Redesign: early lessons from the Australian experience

    Directory of Open Access Journals (Sweden)

    Marianne Broadbent

    1995-05-01

    Full Text Available Business Process Redesign (BPR is a change management approach aimed at achieving quantum improvements in business performance. Industry interest levels in BPR are high as a direct result of current difficulties in the global economic climate and tight business conditions. Integral to BPR is the availability of new stable technologies which both stimulate and enable process changes. This paper highlights the experiences of a number of Australian firms which have implemented BPR. A ten step framework for BPR is presented together with a series of caveats. BPR is a difficult, messy and often non-linear activity which challenges many of the ways organisations operate. Information Technology plays a pivotal role in BPR as both an enabler and disenabler for change. Lessons emerging from early Australian experiences with BPR focus on the role of executive sponsorship, consultants, measurements, education and training, technology and people involved in the change process.

  8. Nuclear Power Plant Operating Experience from the IAEA/NEA International Reporting System for Operating Experience 2012-2014

    International Nuclear Information System (INIS)

    2018-03-01

    The International Reporting System for Operating Experience (IRS) is an essential element of the international operating experience feedback system for nuclear power plants. Its fundamental objective is to contribute to improving safety of commercial nuclear power plants which are operated worldwide. IRS reports contain information on events of safety significance with important lessons learned which assist in reducing recurrence of events at other plants. This sixth publication, covering the period 2012 - 2014, follows the structure of the previous editions. It highlights important lessons based on a review of the approximately 240 event reports received from the participating countries over this period.

  9. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  10. Operational experience with superconducting synchrotron magnets

    International Nuclear Information System (INIS)

    Martin, P.S.

    1987-01-01

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comparisons are made between the operating efficiencies for the superconducting machine and for the conventional Main Ring

  11. Operational experience with superconducting synchrotron magnets

    International Nuclear Information System (INIS)

    Martin, P.S.

    1987-03-01

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comprisons are made between the operating efficiencies for the superconducting machine and for he conventional Main Ring

  12. Operating experience insights supporting ageing assessments

    International Nuclear Information System (INIS)

    Nitoi, M.

    2013-01-01

    Be effective in ageing management means looking at the right aspects, with the right techniques, and one of the most effective tool which could be used for that purpose is the analysis of operating experience. The paper has as objective to perform a review of available operating experience, with the aim to provide a better picture about the impact of ageing effects. The IAEA International Reporting System and NRC Licensee Event Reports were chosen as reference databases, both databases being internationally recognized as important sources of information about events occurrences in the nuclear power plants. The ageing related events identified in the selected time window were analyzed in detail, and the contributions of each major degradation mechanisms that have induced the ageing related events (specific to each defined group of components) was represented and discussed. The paper demonstrates the possibility to use operating experience insights in highlighting the ageing effects. (authors)

  13. ETSON proposal on the European operational experience feedback system

    International Nuclear Information System (INIS)

    Maqua, Michael; Bertrand, Remy; Gelder, Pieter de

    2007-01-01

    The new IAEA Safety Fundamentals states regarding the operating experience feedback: The feedback of operating experience from facilities and activities - and, where relevant, from elsewhere - is a key means of enhancing safety. Processes must be put in place for the feedback and analysis of operating experience, including initiating events, accident precursors, near misses, accidents and unauthorized acts, so that lessons may be learned, shared and acted upon. This presentation deals with the proposal of the ETSON (European TSO Network) to optimize the European operating experiences feedback (OEF). It is generally recognized that the efficiency of nuclear safety supervision by public authorities is based on two key requirements: - the existence of a competent authority at national level, benefiting from an appropriate legislative and regulatory basis, from adequate (quantitatively and qualitatively) human resources, particularly for inspection purposes, - the availability of resources devoted to highly specialised independent technical expertise, in order to provide competent authorities with pertinent technical opinions on: -- the safety files provided by operators, for the purpose of licensing corresponding activities, -- the exploitation for regulatory purposes of the operating experience feed back from licensed nuclear installations. There are two worldwide systems intended to learn lessons from experience: the WANO (World Association of Nuclear Operators) system established by the licensees with access restricted to operating organizations and the IRS system jointly operated by IAEA and OECD/NEA accessible to regulators and to some other users nominated by the regulators in their countries. The IRS itself is dedicated to the analysis of safety significant operating events. NEA/CNRA runs a permanent working group on operating experience (WGOE). WGOE provides among other things also generic reports on safety concerns related to operating experiences and

  14. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  15. Operating experience and TPA: the Italian perspective

    International Nuclear Information System (INIS)

    Grimaldi, G.

    1990-01-01

    Collection and analysis of operating experience from the Italian plants and utilization of abroad data both to plants in operation and in construction are presented. Some results are also referred, aimed to evidence the role of the international cooperation to safe operation of nuclear plants. The approach to the Trend and Pattern analyses is described as well, and the use of computerized techniques of analysis on personal computer. Finally on going activities are introduced, specifically application of operating experience of plants in operation to small sized reactors and to ones with more intrinsic safety characteristics; review of the reporting system for future application and comparative analysis of the different realization of selected safety systems

  16. Best practices in identifying, reporting and screening operating experience at nuclear power plants

    International Nuclear Information System (INIS)

    2008-03-01

    IAEA Safety Standards Series No. SF-1 entitled Fundamental Safety Principles: Safety Fundamentals states the need for operating organizations to establish a programme for the collection and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to relevant national and international organizations, and corrective actions are effectively implemented. This publication has been developed to provide advice and assistance to nuclear installations, and related institutions including contractors and support organizations to strengthen and enhance their own feedback process through the implementation of best practices in identifying, reporting and screening processes and to assess the effectiveness of the above areas. To support a proactive safety management approach the nuclear installations are enhancing the operating experience feedback (OEF) processes. For this purpose, the nuclear industry is striving to collect more information on occurrences that are useful to address the early signs of declining performance and improve operational safety performance. In this environment a strong reporting culture that motivates people to identify and report issues is an important attribute. As a consequence, the number and diversity of issues identified increases, and there is a need to set thresholds of screening for further treatment. Thus, the establishment of an effective identification, reporting and screening process is very beneficial to streamline the efforts, and ensure that major incidents and latent weaknesses are being addressed and that operating experience is treated according to its significance. This leads to improved safety and production. This publication was written to complement the publication IAEA Services Series No. 10 - PROSPER Guidelines - Guidelines for Peer Review and for

  17. FFTF operational experience

    International Nuclear Information System (INIS)

    Newland, D.J.; Krupar, J.J.

    1984-01-01

    In April 1982, the FFTF began its first nominally 100 day irradiation cycle. Since that time the plant has operated very well with steadily increasing plant capacity factors during its first four cycles. One hundred fifty fuel assemblies (eighty of which are experiments) and over 32,000 individual fuel pins have been irradiated, some in excess of 100 MWd/Kg burnup. Specialized equipment and systems unique to sodium cooled reactor plants have performed well

  18. Steam generator operating experience update, 1982-1983

    International Nuclear Information System (INIS)

    Frank, L.

    1984-06-01

    This report is a continuation of earlier reports by the staff addressing pressurized water reactor steam generator operating experience. NUREG-0886, Steam Generator Tube Experience, published in February 1982 summarized experience in domestic and foreign plants through December 1981. This report summarizes steam generator operating experience in domestic plants for the years 1982 and 1983. Included are new problems encountered with secondary-side loose parts, sulfur-induced stress-assisted corrosion cracking, and flow-induced vibrational wear in the new preheater design steam generators. The status of Unresolved Safety Issues A3, A4, and A5 is also discussed

  19. Impact of LMFBR operating experience on PFBR design

    International Nuclear Information System (INIS)

    Bhoje, S.B.; Chetal, S.C.; Chellapandi, P.; Govindarajan, S.; Lee, S.M.; Kameswara Rao, A.S.L.; Prabhakar, R.; Raghupathy, S.; Sodhi, B.S.; Sundaramoorthy, T.R.; Vaidyanathan, G.

    2000-01-01

    PFBR is a 500 MWe, sodium cooled, pool type, fast breeder reactor currently under detailed design. It is essential to reduce the capital cost of PFBR in order to make it competitive with thermal reactors. Operating experience of LMFBRs provides a vital input towards simplification of the design, improving its reliability, enhancing safety and achieving overall cost reduction. This paper includes a summary of LMFBR operating experience and details the design features of PFBR as influenced by operating experience of LMFBRs. (author)

  20. Emergency planning and operating experience

    International Nuclear Information System (INIS)

    Halpern, O.; Breniere, J.

    1984-01-01

    The purpose of this paper is to derive lessons from operating experience for the planning of emergency measures. This operating experience has two facets: it is obtained not only from the various incidents and accidents which have occurred in countries with nuclear power programmes and from the resulting application of emergency plans but also from the different exercises and simulations carried out in France and in other countries. Experience generally confirms the main approaches selected for emergency plans. The lessons to be derived are of three types: first, it appears necessary to set forth precisely the responsibilities of each person involved in order to prevent a watering-down of decisions in the event of an accident; secondly, considerable improvements need to be made in the different communication networks to be used; and thirdly, small accidents with minor radiological consequences deserve as systematic and thorough an approach as large and more improbable accidents. (author)

  1. Operating practical experience at Argentina

    International Nuclear Information System (INIS)

    Quihillalt, Oscar

    1997-01-01

    Operating experiences of Atucha-1 and Embalse Nuclear Power Plants were discussed in this work. The technical and economic aspects, such as reliability, availability, personnel training, operating costs, prices and market, which exercise influence upon Argentina nuclear energy policy, mainly on the power electric generation by nuclear power plants were considered. Finally the current status of the nucleoelectric sector in Argentina and forecasting were analysed

  2. Accelerator/Experiment Operations - FY 2016

    International Nuclear Information System (INIS)

    Blake, A.; Convery, M.; Geer, S.; Geesaman, D.; Harris, D.; Johnson, D.; Lang, K.; McFarland, K.; Messier, M.; Moore, C. D.; Newhart, D.; Reimer, P. E.; Plunkett, R.; Rominsky, M.; Sanchez, M.; Schmidt, J. J.; Shanahan, P.; Tate, C.; Thomas, J.; Donatella Torretta, Donatella Torretta; Matthew Wetstein, Matthew Wetstein

    2016-01-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  3. Accelerator/Experiment Operations - FY 2016

    Energy Technology Data Exchange (ETDEWEB)

    Blake, A. [Argonne National Lab. (ANL), Argonne, IL (United States); Convery, M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geer, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geesaman, D. [Argonne National Lab. (ANL), Argonne, IL (United States); Harris, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Johnson, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Lang, K. [Argonne National Lab. (ANL), Argonne, IL (United States); McFarland, K. [Argonne National Lab. (ANL), Argonne, IL (United States); Messier, M. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, C. D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Newhart, D. [Fermilab; Reimer, P. E. [Argonne; Plunkett, R. [Fermilab; Rominsky, M. [Fermilab; Sanchez, M. [Iowa State U.; Schmidt, J. J. [Fermilab; Shanahan, P. [Fermilab; Tate, C. [Fermilab; Thomas, J. [University Coll. London; Donatella Torretta, Donatella Torretta [Fermilab; Matthew Wetstein, Matthew Wetstein [Iowa State University

    2016-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  4. Relationships between Childhood Traumatic Experiences, Early Maladaptive Schemas and Interpersonal Styles

    Science.gov (United States)

    KAYA TEZEL, Fulya; TUTAREL KIŞLAK, Şennur; BOYSAN, Murat

    2015-01-01

    Introduction Cognitive theories of psychopathology have generally proposed that early experiences of childhood abuse and neglect may result in the development of early maladaptive self-schemas. Maladaptive core schemas are central in the development and maintenance of psychological symptoms in a schema-focused approach. Psychosocial dysfunction in individuals with psychological problems has been consistently found to be associated with symptom severity. However, till date, linkages between psychosocial functioning, early traumatic experiences and core schemas have received little attention. The aim of the present study was to explore the relations among maladaptive interpersonal styles, negative experiences in childhood and core self-schemas in non-clinical adults. Methods A total of 300 adults (58% women) participated in the study. The participants completed a socio-demographic questionnaire, Young Schema Questionnaire, Childhood Trauma Questionnaire and Interpersonal Style Scale. Results Hierarchical regression analyses revealed that the Disconnection and Rejection and Impaired Limits schema domains were significant antecedents of maladaptive interpersonal styles after controlling for demographic characteristics and childhood abuse and neglect. Associations of child sexual abuse with Emotionally Avoidant, Manipulative and Abusive interpersonal styles were mediated by early maladaptive schemas. Early maladaptive schemas mediated the relations of emotional abuse with Emotionally Avoidant and Avoidant interpersonal styles as well as the relations of physical abuse with Avoidant and Abusive interpersonal styles. Conclusion Interpersonal styles in adulthood are significantly associated with childhood traumatic experiences. Significant relations between early traumatic experiences and maladaptive interpersonal styles are mediated by early maladaptive schemas. PMID:28360715

  5. Relationships between Childhood Traumatic Experiences, Early Maladaptive Schemas and Interpersonal Styles.

    Science.gov (United States)

    Kaya Tezel, Fulya; Tutarel Kişlak, Şennur; Boysan, Murat

    2015-09-01

    Cognitive theories of psychopathology have generally proposed that early experiences of childhood abuse and neglect may result in the development of early maladaptive self-schemas. Maladaptive core schemas are central in the development and maintenance of psychological symptoms in a schema-focused approach. Psychosocial dysfunction in individuals with psychological problems has been consistently found to be associated with symptom severity. However, till date, linkages between psychosocial functioning, early traumatic experiences and core schemas have received little attention. The aim of the present study was to explore the relations among maladaptive interpersonal styles, negative experiences in childhood and core self-schemas in non-clinical adults. A total of 300 adults (58% women) participated in the study. The participants completed a socio-demographic questionnaire, Young Schema Questionnaire, Childhood Trauma Questionnaire and Interpersonal Style Scale. Hierarchical regression analyses revealed that the Disconnection and Rejection and Impaired Limits schema domains were significant antecedents of maladaptive interpersonal styles after controlling for demographic characteristics and childhood abuse and neglect. Associations of child sexual abuse with Emotionally Avoidant, Manipulative and Abusive interpersonal styles were mediated by early maladaptive schemas. Early maladaptive schemas mediated the relations of emotional abuse with Emotionally Avoidant and Avoidant interpersonal styles as well as the relations of physical abuse with Avoidant and Abusive interpersonal styles. Interpersonal styles in adulthood are significantly associated with childhood traumatic experiences. Significant relations between early traumatic experiences and maladaptive interpersonal styles are mediated by early maladaptive schemas.

  6. Experience from the construction and operation of Tarapur and Rajasthan Nuclear Power Stations

    International Nuclear Information System (INIS)

    Shah, J.C.; Pardiwala, T.F.; Kothare, V.V.; Rao, M.H.P.; Nanjundeswaran, K.

    1977-01-01

    India's experience in construction and operation of nuclear power stations so far covers two BWR and four PHWR Units in three power stations. Two more PHWR units are at an early stage of construction. The twin unit Tarapur Station (2x210 MWe BWR) was built as a turnkey project which restricted participation of Indian engineers in design and construction considerably. The contrasting approach adopted for Rajasthan Station (2x220 MWe PHWR) involved Indian personnel and contractors fully in construction and commissioning, with Canadians providing supervisory assistance in Rajasthan I and essentially consultative help for Rajasthan II. Subsequent stations are wholly Indian efforts. Tarapur went into commercial operation in 1969, 60 months after breaking of ground. Construction was essentially uneventful, major problems faced being stress corrosion induced cracks in the reactor lining and complete change of steam generator tubes. In its seven years of operations, Tarapur has faced several problems mainly arising from rather early designs, indifferent fuel performance, constraints of twin-unit approach and operations in an inadequately developed grid system apart from those generally stemming from assimilation of an advanced technology in a developing country. The Station has undergone six refuellings during this period. Most of the problems have been overcome by design changes, system augmentations and experience and the Station operation since mid 1974 have generally been steady at around 90% of the rated capacity. Construction of Rajasthan I at a remote and isolated site proceeded relatively slowly. Local availability of skilled and semi-skilled manpower was poor, affecting construction. Inadequate roads impeded movements of overdimensioned components. Observing strict Quality Assurance standards required several major rectifications at site. Rajasthan I went on line in 1973 after overcoming major turbine bearing problems during commissioning. Since then, while

  7. MIT January Operational Internship Experience 2011

    Science.gov (United States)

    DeLatte, Danielle; Furhmann, Adam; Habib, Manal; Joujon-Roche, Cecily; Opara, Nnaemeka; Pasterski, Sabrina Gonzalez; Powell, Christina; Wimmer, Andrew

    2011-01-01

    This slide presentation reviews the 2011 January Operational Internship experience (JOIE) program which allows students to study operational aspects of spaceflight, how design affects operations and systems engineering in practice for 3 weeks. Topics include: (1) Systems Engineering (2) NASA Organization (3) Workforce Core Values (4) Human Factors (5) Safety (6) Lean Engineering (7) NASA Now (8) Press, Media, and Outreach and (9) Future of Spaceflight.

  8. STORMVEX: The Storm Peak Lab Cloud Property Validation Experiment Science and Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mace, J; Matrosov, S; Shupe, M; Lawson, P; Hallar, G; McCubbin, I; Marchand, R; Orr, B; Coulter, R; Sedlacek, A; Avallone, L; Long, C

    2010-09-29

    During the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX), a substantial correlative data set of remote sensing observations and direct in situ measurements from fixed and airborne platforms will be created in a winter season, mountainous environment. This will be accomplished by combining mountaintop observations at Storm Peak Laboratory and the airborne National Science Foundation-supported Colorado Airborne Multi-Phase Cloud Study campaign with collocated measurements from the second ARM Mobile Facility (AMF2). We describe in this document the operational plans and motivating science for this experiment, which includes deployment of AMF2 to Steamboat Springs, Colorado. The intensive STORMVEX field phase will begin nominally on 1 November 2010 and extend to approximately early April 2011.

  9. Accelerator/Experiment Operations - FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Czarapata, P. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2015 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

  10. Operational early warning platform for extreme meteorological events

    Science.gov (United States)

    Mühr, Bernhard; Kunz, Michael

    2015-04-01

    Operational early warning platform for extreme meteorological events Most natural disasters are related to extreme weather events (e.g. typhoons); weather conditions, however, are also highly relevant for humanitarian and disaster relief operations during and after other natural disaster like earthquakes. The internet service "Wettergefahren-Frühwarnung" (WF) provides various information on extreme weather events, especially when these events are associated with a high potential for large damage. The main focus of the platform is on Central Europe, but major events are also monitored worldwide on a daily routine. WF provides high-resolution forecast maps for many weather parameters which allow detailed and reliable predictions about weather conditions during the next days in the affected areas. The WF service became operational in February 2004 and is part of the Center for Disaster Management and Risk Reduction Technology (CEDIM) since 2007. At the end of 2011, CEDIM embarked a new type of interdisciplinary disaster research termed as forensic disaster analysis (FDA) in near real time. In case of an imminent extreme weather event WF plays an important role in CEDIM's FDA group. It provides early and precise information which are always available and updated several times during a day and gives advice and assists with articles and reports on extreme events.

  11. Continuous Air Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2008-01-01

    Continuous air monitors (CAMs) are used to sense radioactive particulates in room air of nuclear facilities. CAMs alert personnel of potential inhalation exposures to radionuclides and can also actuate room ventilation isolation for public and environmental protection. This paper presents the results of a CAM operating experience review of the DOE Occurrence Reporting and Processing System (ORPS) database from the past 18 years. Regulations regarding these monitors are briefly reviewed. CAM location selection and operation are briefly discussed. Operating experiences reported by the U.S. Department of Energy and in other literature sources were reviewed to determine the strengths and weaknesses of these monitors. Power losses, human errors, and mechanical issues cause the majority of failures. The average 'all modes' failure rate is 2.65E-05/hr. Repair time estimates vary from an average repair time of 9 hours (with spare parts on hand) to 252 hours (without spare parts on hand). These data should support the use of CAMs in any nuclear facility, including the National Ignition Facility and the international ITER experiment

  12. Operating experience of natural circulation core cooling in boiling water reactors

    International Nuclear Information System (INIS)

    Kullberg, C.; Jones, K.; Heath, C.

    1993-01-01

    General Electric (GE) has proposed an advanced boiling water reactor, the Simplified Boiling Water Reactor (SBWR), which will utilize passive, gravity-driven safety systems for emergency core coolant injection. The SBWR design includes no recirculation loops or recirculation pumps. Therefore the SBWR will operate in a natural circulation (NC) mode at full power conditions. This design poses some concerns relative to stability during startup, shutdown, and at power conditions. As a consequence, the NRC has directed personnel at several national labs to help investigate SBWR stability issues. This paper will focus on some of the preliminary findings made at the INEL. Because of the broad range of stability issues this paper will mainly focus on potential geysering instabilities during startup. The two NC designs examined in detail are the US Humboldt Bay Unit 3 BWR-1 plant and Dodewaard plant in the Netherlands. The objective of this paper will be to review operating experience of these two plants and evaluate their relevance to planned SBWR operational procedures. For completeness, experimental work with early natural circulation GE test facilities will also be briefly discussed

  13. Operating manual for the critical experiments facility

    International Nuclear Information System (INIS)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written

  14. Operating manual for the critical experiments facility

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written.

  15. Accelerator/Experiment operations - FY 2006

    Energy Technology Data Exchange (ETDEWEB)

    Brice, S.; Conrad, J.; Denisov, D.; Ginther, G.; Holmes, S.; James, C.; Lee, W.; Louis, W.; Moore, C.; Plunkett, R.; Raja, R.; /Fermilab

    2006-10-01

    This Technical Memorandum (TM) summarizes the Fermilab accelerator and experiment operations for FY 2006. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2006 Run II at the Tevatron Collider, the MiniBooNE experiments running in the Booster Neutrino Beam in neutrino and antineutrino modes, MINOS using the Main Injector Neutrino Beam (NuMI), and SY 120 activities.

  16. Incorporating operational experience and design changes in availability forecasts

    International Nuclear Information System (INIS)

    Norman, D.

    1988-01-01

    Reliability or availability forecasts which are based solely on past operating experience will be precise if the sample is large enough, and unbiased if nothing in the future design, environment, operating region or anything else changes. Unfortunately, life is never like that. This paper considers the methodology and philosophy of modifying forecasts based on past experience to take account also of changes in design, construction methods, operating philosophy, environments, operator training and so on, between the plants which provided the operating experience and the plant for which the forecast is being made. This emphasises the importance of collecting, assessing, and learning from past data and of a thorough knowledge of future designs, and procurement, operation, and maintenance policies. The difference between targets and central estimates is also discussed. The paper concludes that improvements in future availability can be made by learning from past experience, but that certain conditions must be fulfilled in order to do so. (author)

  17. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  18. Recent operating experiences and programs at EBR-II

    International Nuclear Information System (INIS)

    Lentz, G.L.

    1984-01-01

    Experimental Breeder Reactor No. II (EBR-II) is a pool-type, unmoderated, sodium-cooled reactor with a design power of 62.5 MWt and an electrical generation capability of 20 MW. It has been operated by Argonne National Laboratory for the US government for almost 20 years. During that time, it has operated safely and has demonstrated stable operating characteristics, high availability, and excellent performance of its sodium components. The 20 years of operating experience of EBR-II is a valuable resource to the nuclear community for the development and design of future LMFBR's. Since past operating experience has been extensively reported, this report will focus on recent programs and events

  19. The Early Experiments

    Science.gov (United States)

    Garvey, Gerald

    2013-04-01

    Stuart Freedman obtained his PhD at Berkley with an experimental thesis providing very strong evidence against theories requiring local hidden variables. He then came to Princeton in 1972 and began collaboration on a search for second-class currents. These measurements are quite difficult as the effects are the order of 1%, demonstrating Freedman's drive to take on hard but important experiments. After carrying out some relatively standard nuclear physics measurements he moved on to Stanford in 1976. There, Freedman was involved in identifying measurements sensitive to the existence of light axions. He also carried out searches for various exotica that might be produced from cosmic rays or the SLAC beam stop. During this time he was collaborating with us at Argonne investigating nuclear parity violation and time-like axial beta decay. In 1982 Freedman came to Argonne where he worked on fundamental issues in neutron beta decay. He also initiated what was to become one of his trademarks, demonstrating that surprising peaks in the e^+-e^- spectrum observed in very heavy ion collisions were spurious. He further launched his first neutrino oscillation experiment. This period of early research was marked by a remarkable diversity of subject matter and approach.

  20. Operating experience with the Harwell thermo-mechanical generators

    International Nuclear Information System (INIS)

    Cooke-Yarborough, E.H.

    1980-06-01

    The Stirling-cycle thermo-mechanical generator (TMG) provides small amounts of electrical power continuously over long periods, while requiring much less fuel than other power sources running from hydrocarbon fuel or radio-isotopes. Two of these 25-watt generators, fuelled by propane, have been used to power the UK National Buoy on two successive missions. A total of more than three years experience at sea has now been accumulated. In addition, a 60-watt version has provided the power for a major lighthouse for more than a year. An early development version of the Thermo-mechanical Generator, adapted to run from the heat of a radio-isotope source, was loaded with strontium 90 titanate in October 1974 and has run continuously in the laboratory ever since. The improvements and changes found necessary in the course of 90,000 generator-hours of running time are described, and the improvements in operational performance and reliability which have resulted are outlined. (author)

  1. Operational experience with Dragon reactor experiment of relevance to commercial reactors

    International Nuclear Information System (INIS)

    Capp, P.D.; Simon, R.A.

    1976-01-01

    An important part of the experience gained during the first ten years of successful power operation of the Dragon Reactor is relevant to the design and operation of future High Temperature Reactors (HTRs). The aspects presented in this paper have been chosen as being particularly applicable to larger HTR systems. Core performance under a variety of conditions is surveyed with particular emphasis on a technique developed for the identification and location of unpurged releasing fuel and the presence of activation and fission products in the core area. The lessons learned during the reflector block replacement are presented. Operating experience with the primary circuit identifies the lack of mixing of gas streams within the hot plenum and the problems of gas streaming in ducts. Helium leakage from the circuit is often greater than the optimum 0.1%/d. Virtually all the leakage problems are associated with the small bore instrument pipework essential for the many experiments associated with the Dragon Reactor Experiment (DRE). Primary circuit maintenance work confirms the generally clean state of the DRE circuit but identifies 137 Cs and 110 Agsup(m) as possible hazards if fuel emitting these isotopes is irradiated. (author)

  2. Operational experience of the Marcoule reactors

    International Nuclear Information System (INIS)

    Conte, F.

    1963-01-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [fr

  3. Treatment of operational experience of nuclear power plants in WANO

    International Nuclear Information System (INIS)

    Ibanez, M.

    2013-01-01

    The article describes the activities associated to the Operating Experience Programme of the World Association of Nuclear Operators. The programme manages the event reports submitted by the nuclear power plants to the WANO database for the preparation by the Operating Experience Central Team of some documents like the significant Operating Experience Reports and Significant Event Reports that help the stations to avoid similar events. (Author)

  4. Operating experience with high beta superconducting RF cavities

    International Nuclear Information System (INIS)

    Dylla, H.F.; Doolittle, L.R.; Benesch, J.F.

    1993-01-01

    The number of installed and operational β=1 superconducting rf cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the U.S. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed

  5. Operating experience with high beta superconducting rf cavities

    International Nuclear Information System (INIS)

    Dylla, H.F.; Doolittle, L.R.; Benesch, J.F.

    1993-06-01

    The number of installed and operational β = 1 superconducting rf cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the US. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed

  6. The Cooney Ridge Fire Experiment: An early operation to relate pre-, active, and post-fire field and remotely sensed measurements

    Science.gov (United States)

    Andrew T. Hudak; Patrick H. Freeborn; Sarah A. Lewis; Sharon M. Hood; Helen Y. Smith; Colin C. Hardy; Robert J. Kremens; Bret W. Butler; Casey Teske; Robert G. Tissell; Lloyd P. Queen; Bryce L. Nordgren; Benjamin C. Bright; Penelope Morgan; Philip J. Riggan; Lee Macholz; Leigh B. Lentile; James P. Riddering; Edward E. Mathews

    2018-01-01

    The Cooney Ridge Fire Experiment conducted by fire scientists in 2003 was a burnout operation supported by a fire suppression crew on the active Cooney Ridge wildfire incident. The fire experiment included measurements of pre-fire fuels, active fire behavior, and immediate post-fire effects. Heat flux measurements collected at multiple scales with multiple ground and...

  7. Entering 'A NEW REALM' of KIBO Payload Operations - Continuous efforts for microgravity experiment environment and lessons learned from real time experiment operations in KIBO -

    International Nuclear Information System (INIS)

    Sakagami, K; Goto, M; Matsumoto, S; Ohkuma, H

    2011-01-01

    On January 22nd, 2011(JST), KOUNOTORI2 (H-II Transfer Vehicle: HTV2) was successfully launched from Tanegashima Space Center toward the International Space Station (ISS) and two new JAXA payload racks, Kobairo rack and MSPR (Multi-purpose Small Payload Rack) were transferred to ISS/KIBO (Japanese Experiment Module: JEM). In addition to Saibo rack and Ryutai rack which are already in operation in KIBO, in total 4 Japanese experiment payload racks start operations in KIBO. Then KIBO payload operations embark on a new realm, full utilization phase. While the number and variety of microgravity experiments become increasing, simultaneous operation constraints should be considered to achieve multitask payload operations in ISS/KIBO and ever more complicated cooperative operations between crewmember and flight control team/science team are required. Especially for g-jitter improvement in ISS/KIBO, we have greatly advanced cooperative operations with crewmember in the recent increment based on the microgravity data analysis results. In this paper, newly operating Japanese experiment payloads characteristics and some methods to improve g-jitter environment are introduced from the front line of KIBO payload operations.

  8. How does a neuron know to modulate its epigenetic machinery in response to early-life environment/experience?

    Directory of Open Access Journals (Sweden)

    Carley A Karsten

    2013-08-01

    Full Text Available Exciting information is emerging about epigenetic mechanisms and their role in long-lasting changes of neuronal gene expression. Whereas these mechanisms are active throughout life, recent findings point to a critical window of early postnatal development during which neuronal gene expression may be persistently re-programmed via epigenetic modifications. However, it remains unclear how the epigenetic machinery is modulated. Here we focus on an important example of early-life programming: the effect of sensory input from the mother on expression patterns of key stress-related genes in the developing brain. We focus on the lasting effects of this early life experience on corticotropin releasing hormone (CRH gene expression in the hypothalamus, and describe recent work that integrates organism-wide signals with cellular signals that in turn impact epigenetic regulation. We describe the operational brain networks that convey sensory input to CRH-expressing cells, and highlight the resulting re-wiring of synaptic connectivity to these neurons. We then move from intercellular to intracellular mechanisms, speculating about the induction and maintenance of lifelong CRH repression provoked by early-life experience. Elucidating such pathways is critical for understanding the enduring links between experience and gene expression. In the context of responses to stress, such mechanisms should contribute to vulnerability or resilience to post-traumatic stress disorder (PTSD and other stress-related disorders.

  9. Early versus delayed post-operative bathing or showering to prevent wound complications.

    Science.gov (United States)

    Toon, Clare D; Sinha, Sidhartha; Davidson, Brian R; Gurusamy, Kurinchi Selvan

    2015-07-23

    Many people undergo surgical operations during their life-time, which result in surgical wounds. After an operation the incision is closed using stiches, staples, steri-strips or an adhesive glue. Usually, towards the end of the surgical procedure and before the patient leaves the operating theatre, the surgeon covers the closed surgical wound using gauze and adhesive tape or an adhesive tape containing a pad (a wound dressing) that covers the surgical wound. There is currently no guidance about when the wound can be made wet by post-operative bathing or showering. Early bathing may encourage early mobilisation of the patient, which is good after most types of operation. Avoiding post-operative bathing or showering for two to three days may result in accumulation of sweat and dirt on the body. Conversely, early washing of the surgical wound may have an adverse effect on healing, for example by irritating or macerating the wound, and disturbing the healing environment. To compare the benefits (such as potential improvements to quality of life) and harms (potentially increased wound-related morbidity) of early post-operative bathing or showering (i.e. within 48 hours after surgery, the period during which epithelialisation of the wound occurs) compared with delayed post-operative bathing or showering (i.e. no bathing or showering for over 48 hours after surgery) in patients with closed surgical wounds. We searched The Cochrane Wounds Group Specialised Register (30th June 2015); The Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library); The Database of Abstracts of Reviews of Effects (DARE) (The Cochrane Library); Ovid MEDLINE; Ovid MEDLINE (In-Process & Other Non-Indexed Citations); Ovid EMBASE; EBSCO CINAHL; the metaRegister of Controlled Trials (mRCT) and the International Clinical Trials Registry Platform (ICTRP). We considered all randomised trials conducted in patients who had undergone any surgical procedure and had surgical closure of

  10. FFTF operating experience, 1982-1984

    International Nuclear Information System (INIS)

    Waldo, J.B.; Franz, G.R.; Loika, E.F.; Krupar, J.J.

    1984-01-01

    The Fast Flux Test Facility (FFTF) is a 400 Mwt sodium-cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US Liquid Metal Fast Breeder Reactor (LMFBR) program. Startup and initial power testing included a comprehensive series of nonnuclear and nuclear tests to verify the thermal, hydraulic, and neutronic characteristics of the plant. A specially designed series of natural circulation tests were then performed to demonstrate the inherent safety features of the plant. Early in 1982, the FFTF began its first 100-day irradiation cycle. Since that time the plant has operated very well, achieving a cycle capacity factor of 94% in the most recent irradiation cycle. Seventy-five specific test assemblies and 25,000 individual fuel pins have been irradiated, some in excess of 80 MWd/Kg

  11. USA/FBR program status FFTF operations startup experience

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Izatt, R.D.

    1981-06-01

    This paper gives highlights of the major Operations evaluations and operational results of the startup acceptance testing program and initiation of normal operating cycles for experiment irradiation in the FFTF. 33 figures

  12. Limitations of the inspection and testing concepts for pressurised components from the viewpoint of operating experience

    International Nuclear Information System (INIS)

    Schulz, H.

    2001-01-01

    The role of in-service inspection and testing is to contribute to a safe and reliable operation of systems, structures and components. It is therefore the objective of inspections and tests to identify malfunctions and degradations at a stage early enough to avoid detrimental impacts on safety as well as on the reliability of the plant. Taking mostly the pressure boundary of German light-water reactors as an example, it is the intention of this paper to analyse how successful present inspection and testing requirements are and to discuss limitations. Based on a review of the world-wide operating experience the following questions of a more generic nature are addressed: - Are the relevant damage mechanisms being addressed in our codes and standards? - What are the criteria to develop a representative scope of inspection? - How to maintain a sufficient level of information for a decreasing number of nuclear power plants in operation? It can be concluded that the revision of codes and standards according to lessons learned from operating experience remains as an ongoing process. Furthermore, the criteria applied to derive a representative scope of inspection need to be addressed in more detail, specifically with respect to corrosion. The continuous evaluation of operating experience of a large number of plants is the most valuable source to identify beginning degradations. (author)

  13. Early Extubation in the Operating Room after Congenital Open-Heart Surgery.

    Science.gov (United States)

    Fukunishi, Takuma; Oka, Norihiko; Yoshii, Takeshi; Kobayashi, Kensuke; Inoue, Nobuyuki; Horai, Tetsuya; Kitamura, Tadashi; Okamoto, Hirotsugu; Miyaji, Kagami

    2018-01-27

    Early extubation in the operating room after congenital open-heart surgery is feasible, but extubation in the intensive care unit after the operation remains common practice at many institutions. The purpose of this study was to evaluate retrospectively the adequacy of our early-extubation strategy and exclusion criteria through analysis based on the Risk Adjustment in Congenital Heart Surgery method (RACHS-1).This retrospective analysis included 359 cases requiring cardiopulmonary bypass (male, 195; female, 164; weight > 3.0 kg; aged 1 month to 18 years). Neonates and preoperatively intubated patients were excluded. Other exclusion criteria included severe preoperative pulmonary hypertension, high-dose catecholamine requirement after cardiopulmonary bypass, delayed sternal closure, laryngomalacia, serious bleeding, and delayed awakening. The early-extubation rates were compared between age groups and RACHS-1 classes.Overall, 83% of cases (298/359) were extubated in the operating room, classified by RACHS-1 categories as follows: 1, 59/59 (100%); 2, 164/200 (84%); 3, 61/78 (78%); and 4-6, 10/22 (45%). The early extubation rate in categories 1-3 (86%, 288/337) was significantly higher than for categories 4-6 (45.5%, 10/22) (P open-heart surgery was feasible based on our criteria, especially for patients in the low RACHS-1 categories, and involves a very low rate of re-intubation.

  14. Experience on operational safety improvement of control and operation support systems

    International Nuclear Information System (INIS)

    Itoh, N.; Nakagawa, T.; Mano, K.

    1988-01-01

    Japanese nuclear industry started in 1956 and about 30 years have passed since that time. Through these years, we have made a lot of efforts and developments in the field of Control and Instrumentation (C and I) system. The above 30 years and following years can be divided into four major periods. The first one is the period of research, the second of domestic production, the third of improvement, and the fourth of advancement. Improvements of C and I system, which we have made in those periods have made a great contribution to enhancement of reliability, availability and operability of nuclear power plants. Fig. 1 shows TEPCO's nuclear power plant (BWR) construction experience and technical trend of C and I system in Japan. This paper is to introduce the efforts and operational experience on control and operation support systems

  15. Utility of Early Post-operative High Resolution Volumetric MR Imaging after Transsphenoidal Pituitary Tumor Surgery

    Science.gov (United States)

    Patel, Kunal S.; Kazam, Jacob; Tsiouris, Apostolos J.; Anand, Vijay K.; Schwartz, Theodore H.

    2014-01-01

    Objective Controversy exists over the utility of early post-operative magnetic resonance imaging (MRI) after transsphenoidal pituitary surgery for macroadenomas. We investigate whether valuable information can be derived from current higher resolution scans. Methods Volumetric MRI scans were obtained in the early (30 days) post-operative periods in a series of patients undergoing transsphenoidal pituitary surgery. The volume of the residual tumor, resection cavity, and corresponding visual field tests were recorded at each time point. Statistical analyses of changes in tumor volume and cavity size were calculated using the late MRI as the gold standard. Results 40 patients met the inclusion criteria. Pre-operative tumor volume averaged 8.8 cm3. Early postoperative assessment of average residual tumor volume (1.18 cm3) was quite accurate and did not differ statistically from late post-operative volume (1.23 cm3, p=.64), indicating the utility of early scans to measure residual tumor. Early scans were 100% sensitive and 91% specific for predicting ≥ 98% resection (psurgery and a lack of decrease should alert the surgeon to possible persistent compression of the optic apparatus that may warrant re-operation. PMID:25045791

  16. Review and updates of the risk assessment for advanced test reactor operations for operating events and experience

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1996-01-01

    Annual or biannual reviews of the operating history of the Advanced Test Reactor (ATR) at the Idaho National Engineering Laboratory (INEL) have been conducted for the purpose of reviewing and updating the ATR probabilistic safety assessment (PSA) for operating events and operating experience since the first compilation of plant- specific experience data for the ATR PSA which included data for operation from initial power operation in 1969 through 1988. This technical paper briefly discusses the means and some results of these periodic reviews of operating experience and their influence on the ATR PSA

  17. Operational experience with SLAC's beam containment electronics

    International Nuclear Information System (INIS)

    Constant, T.N.; Crook, K.; Heggie, D.

    1977-03-01

    Considerable operating experience was accumulated at SLAC with an extensive electronic system for the containment of high power accelerated beams. Average beam power at SLAC can approach 900 kilowatts with the potential for burning through beam stoppers, protection collimators, and other power absorbers within a few seconds. Fast, reliable, and redundant electronic monitoring circuits have been employed to provide some of the safeguards necessary for minimizing the risk to personnel. The electronic systems are described, and the design philosophy and operating experience are discussed

  18. Lessons from early experience in reactor development

    International Nuclear Information System (INIS)

    Allen, W.

    1976-09-01

    This paper deals with several issues in U.S. reactor development and demonstration experience. The focus is on the period between 1946 and 1963 during which the Atomic Energy Commission (AEC) guided early reactor research and development (R and D) and conducted the Power Reactor Demonstration Program

  19. Concluding from operating experience to instrumentation and control systems

    International Nuclear Information System (INIS)

    Pleger, H.; Heinsohn, H.

    1997-01-01

    Where conclusions are drawn from operating experience to instrumentation and control systems, two general statements should be made. First: There have been braekdowns, there have also been deficiencies, but in principle operating experience with the instrumentation and control systems of German nuclear power plants has been good. With respect to the debates about the use of modern digital instrumentation and control systems it is safe to say, secondly, that the instrumentation and control systems currently in use are working reliably. Hence, there is no need at present to replace existing systems for reasons of technical safety. However, that time will come. It is a good thing, therefore, that the use of modern digital instrumentation and control systems is to begin in the field of limiting devices. The operating experience which will thus be accumulated will benefit digital instrumentation and control systems in their qualification process for more demanding applications. This makes proper logging of operating experience an important function, even if it cannot be transferred in every respect. All parties involved therefore should see to it that this operating experience is collected in accordance with criteria agreed upon so as to prevent unwanted surprises later on. (orig.) [de

  20. [Operating Room Nurses' Experiences of Securing for Patient Safety].

    Science.gov (United States)

    Park, Kwang Ok; Kim, Jong Kyung; Kim, Myoung Sook

    2015-10-01

    This study was done to evaluate the experience of securing patient safety in hospital operating rooms. Experiential data were collected from 15 operating room nurses through in-depth interviews. The main question was "Could you describe your experience with patient safety in the operating room?". Qualitative data from the field and transcribed notes were analyzed using Strauss and Corbin's grounded theory methodology. The core category of experience with patient safety in the operating room was 'trying to maintain principles of patient safety during high-risk surgical procedures'. The participants used two interactional strategies: 'attempt continuous improvement', 'immersion in operation with sharing issues of patient safety'. The results indicate that the important factors for ensuring the safety of patients in the operating room are manpower, education, and a system for patient safety. Successful and safe surgery requires communication, teamwork and recognition of the importance of patient safety by the surgical team.

  1. The early experiments leading to the V-Α interaction

    International Nuclear Information System (INIS)

    Telegdi, V.L.

    1989-01-01

    The author cites a number of early experiments of the 1950s which were central to the understanding of V-Α interaction. Some were proposed by T D Lee and C N Yang, who also described the weak interaction with ∞ nonconservation of parity, and some were not. Crucial experiments were performed by small teams and theory and experiment advanced together. (UK)

  2. Fire protection system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  3. Fire protection system operating experience review for fusion applications

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor.

  4. Feedback of operating experience in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The feedback of operating experience of nuclear facilities to the designers, manufacturers, operators and regulators is one important means of maintaining and improving safety. The Atomic Energy Control Board`s Advisory Committee on Nuclear Safety examined the means for feedback currently being employed, how effective they are and what improvements are advisable. The review found that the need for feedback of operating experience is well recognized within those institutions contributing to the safety of CANDU power reactors, and that the existing procedures are generally effective. Some recommendations, however, are submitted for improvement in the process.

  5. Feedback of operating experience in nuclear power plants

    International Nuclear Information System (INIS)

    1995-06-01

    The feedback of operating experience of nuclear facilities to the designers, manufacturers, operators and regulators is one important means of maintaining and improving safety. The Atomic Energy Control Board's Advisory Committee on Nuclear Safety examined the means for feedback currently being employed, how effective they are and what improvements are advisable. The review found that the need for feedback of operating experience is well recognized within those institutions contributing to the safety of CANDU power reactors, and that the existing procedures are generally effective. Some recommendations, however, are submitted for improvement in the process

  6. TSTA piping and flame arrestor operating experience data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C., E-mail: Lee.Cadwallader@inl.gov [Idaho National Laboratory, Idaho Falls, ID (United States); Willms, R. Scott [ITER International Organization, Cadarache (France)

    2015-10-15

    Highlights: • Experiences from the Tritium Systems Test Assembly were examined. • Failure rates of copper piping and a flame arrestor were calculated. • The calculated failure rates compared well to similar data from the literature. • Tritium component failure rate data support fusion safety assessment. - Abstract: The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility was operated with tritium for its research and development program from 1984 to 2001, running a prototype fusion fuel processing loop with ∼100 g of tritium as well as small experiments. There have been several operating experience reports written on this facility's operation and maintenance experience. This paper describes reliability analysis of two additional components from TSTA, small diameter copper gas piping that handled tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  7. Operator training and the training simulator experience

    International Nuclear Information System (INIS)

    Mills, D.

    The author outlines the approach used by Ontario Hydro to train operators from the day they are hired as Operators-in-Training until they are Authorized Unit First Operators. He describes in detail the use of the simulator in the final year of the authorization program, drawing on experience with the Pickering NGS A simulator. Simulators, he concludes, are important aids to training but by no means all that is required to guarantee capable First Operators

  8. Early space symmetry restoration and neutrino experiments

    International Nuclear Information System (INIS)

    Volkov, G.G.; Liparteliani, A.G.; Monich, V.A.

    1986-01-01

    The problem of early space symmetry restoration on the left-right symmetry models and the models with the extended (due to mirror quarks and leptons) fermion sector is being discussed. The experiments in which the derivations from the standard model of electroweak interactions should be studied are presented

  9. Operating Experience Report: Counterfeit, Suspect and Fraudulent Items. Working Group on Operating Experience. Proceedings and Analysis on an Item of Generic Interest

    International Nuclear Information System (INIS)

    2011-01-01

    The NEA Committee on Nuclear Regulatory Activities (CNRA) believes that sharing operating experience from the national operating experience feedback programmes are a major element in the industry's and regulatory body's efforts to ensure the continued safe operation of nuclear facilities. Considering the importance of these issues, the Committee on the Safety of Nuclear Installations (CSNI) established a working group, PWG no.1 (Principle Working Group Number 1) to assess operating experience in the late 1970's, which was later renamed the Working Group on Operating Experience (WGOE). In 1978, the CSNI approved the establishment of a system to collect international operating experience data. The accident at Three Mile Island shortly after added impetus to this and led to the start of the Incident Reporting System (IRS). In 1983, the IRS database was moved to the International Agency for Atomic Energy (IAEA) to be operated as a joint database by IAEA and NEA for the benefit of all of the member countries of both organisations. In 2006, the WGOE was moved to be under the umbrella of the Committee on Nuclear Regulatory Activities (CNRA) in NEA. In 2009, the scope of the Incident Reporting System was expanded and re-named the International Reporting System for Operating Experience (although, the acronym remains the same). The purpose of WGOE is to facilitate the exchange of information, experience, and lessons learnt related to operating experience between member countries. The working group continues its mission to identify trending and issues that should be addressed in specialty areas of CNRA and CSNI working groups. The CSFI (Counterfeit, Suspect, and Fraudulent Items) issue was determined to be the Issue of Generic Interest at the April 2010 WGOE meeting. The Issue of Generic Interest is determined by the working group members for an in-depth discussion. They are often emerging issues in operating experience that a country or several countries would to the share

  10. Prompt Loss of Energetic Ions during Early Neutral Beam Injection in the National Spherical Torus Experiment

    International Nuclear Information System (INIS)

    Medley, S.S.; Darrow, D.S.; Liu, D.; Roquemore, A.L.

    2005-01-01

    Early neutral-beam injection is used in the National Spherical Torus Experiment (NSTX) to heat the electrons and slow current penetration which keeps q(0) elevated to avoid deleterious MHD activity and at the same time reduces Ohmic flux consumption, all of which aids long-pulse operation. However, the low plasma current (I p ∼ 0.5 MA) and electron density (n e ∼ 1 x 10 13 cm -3 ) attending early injection lead to elevated orbit and shine through losses. The inherent orbit losses are aggravated by large excursions in the outer gap width during current ramp-up. An investigation of this behavior using various energetic particle diagnostics on NSTX and TRANSP code analysis is presented

  11. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  12. Proceedings of 2nd PHWR operating safety experience meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage.

  13. Proceedings of 2nd PHWR operating safety experience meeting

    International Nuclear Information System (INIS)

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage

  14. Dry cooling tower operating experience in the LOFT reactor

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1980-01-01

    A dry cooling tower has been uniquely utilized to dissipate heat generated in a small experimental pressurized water nuclear reactor. Operational experience revealed that dry cooling towers can be intermittently operated with minimal wind susceptibility and water hammer occurrences by cooling potential steam sources after a reactor scram, by isolating idle tubes from the external atmosphere, and by operating at relatively high pressures. Operating experience has also revealed that tube freezing can be minimized by incorporating the proper heating and heat loss prevention features

  15. Operating experience with the DRAGON High Temperature Reactor experiment

    International Nuclear Information System (INIS)

    Simon, R.A.; Capp, P.D.

    2002-01-01

    The Dragon Reactor Experiment in Winfrith/UK was a materials test facility for a number of HTR projects pursued in the sixties and seventies of the last century. It was built and managed as an OECD/NEA international joint undertaking. The reactor operated successfully between 1964 and 1975 to satisfy the growing demand for irradiation testing of fuels and fuel elements as well as for technological tests of components and materials. The paper describes the reactor's main experimental features and presents results of 11 years of reactor operation relevant for future HTRs. (author)

  16. The Clearing House on Operating Experience Feedback (CH-OEF)

    International Nuclear Information System (INIS)

    Tanarro Colodron, J.

    2016-01-01

    Full text: The Clearing House on Operating Experience Feedback (CH-OEF) is an online information system that contains three technical databases available only to registered users: 1) Operating Experience Feedback (OEF) records, containing information about events occurred at Nuclear Power Plants; 2) Nuclear Power Plant (NPP) records, containing technical details about NPPs; 3) Documents about operating experience, such as the Topical Operating Experience Reports (TOERs) and the quarterly reports on nuclear power plant events. The main objective of the information system is to develop communication, cooperation and sharing of operating experience amongst the national nuclear regulatory authorities participating in EU Clearinghouse network. The CH-OEF is essential for the preparation and dissemination of the quarterly reports on NPP events. These reports are published every three months and are intended to be complementary to other international reporting systems, containing mainly recent information publicly available. Only events that are considered to be likely to have lessons applicable to EU NPPs or with a real or potential impact on nuclear safety are addressed in the reports. The CH-OEF is a fundamental tool for their preparation, providing specific features for a more efficient sharing of information as well as for facilitating the related discussion and decision making. (author

  17. Operating Experience Review of Tritium-in-Water Monitors

    Energy Technology Data Exchange (ETDEWEB)

    S. A. Bruyere; L. C. Cadwallader

    2011-09-01

    Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

  18. The experience of five years operation of Phenix

    International Nuclear Information System (INIS)

    Conte, F.; Lacroix, A.

    1980-01-01

    Two long periods of exceptional operation have satisfied the hopes of the designers and all parameters, power, efficiency, load factor, fuel behaviour, were better than was expected. The experience resulting from the only major incident provided a series of complementary data. Modern technology has need of sanction by experiment. The Phenix type reactor is a tool which is convenient to operate and to maintain. The two aspects of the demonstration, correct operation and ease of maintenance, take a concrete form in the harmlessness of Phenix on men and on the environment. There is no irradiation and few releases. (orig./DG)

  19. Nuclear power plant operation experience - a feedback programme

    International Nuclear Information System (INIS)

    Banica, I.; Sociu, F.; Margaritescu, C.

    1994-01-01

    An effective high quality maintenance programme is required for the safe reliable operation of a nuclear power plant. To achieve the objectives of such a programme, both plant management and staff must be highly dedicated and motivated to perform high quality work at all levels. Operating and maintenance experience data collections and analysis are necessary in order to enhance the safety of the plant and reliability of the structures systems and components throughout their operating life. Significant events, but also minor incident, may reveal important deficiencies or negative trends adverse to safety. Therefore, a computer processing system for collecting, classifying and evaluating abnormal events or findings concerning operating-maintenance and for feeding back the results of the lessons learned from experience into the design and the operation of our nuclear power plant is considered to be of paramount importance. (Author)

  20. Telescience testbed: Operational support functions for biomedical experiments

    Science.gov (United States)

    Yamashita, Masamichi; Watanabe, Satoru; Shoji, Takatoshi; Clarke, Andrew H.; Suzuki, Hiroyuki; Yanagihara, Dai

    A telescience testbed was conducted to study the methodology of space biomedicine with simulated constraints imposed on space experiments. An experimental subject selected for this testbedding was an elaborate surgery of animals and electrophysiological measurements conducted by an operator onboard. The standing potential in the ampulla of the pigeon's semicircular canal was measured during gravitational and caloric stimulation. A principal investigator, isolated from the operation site, participated in the experiment interactively by telecommunication links. Reliability analysis was applied to the whole layers of experimentation, including design of experimental objectives and operational procedures. Engineering and technological aspects of telescience are discussed in terms of reliability to assure quality of science. Feasibility of robotics was examined for supportive functions to reduce the workload of the onboard operator.

  1. LOFT instrumented fuel design and operating experience

    International Nuclear Information System (INIS)

    Russell, M.L.

    1979-01-01

    A summary description of the Loss-of-Fluid Test (LOFT) system instrumented core construction details and operating experience through reactor startup and loss-of-coolant experiment (LOCE) operations performed to date are discussed. The discussion includes details of the test instrumentation attachment to the fuel assembly, the structural response of the fuel modules to the forces generated by a double-ended break of a pressurized water reactor (PWR) coolant pipe at the inlet to the reactor vessel, the durability of the LOFT fuel and test instrumentation, and the plans for incorporation of improved fuel assembly test instrumentation features in the LOFT core

  2. Nuclear power plant operating experience, 1976

    International Nuclear Information System (INIS)

    1977-11-01

    This report is the third in a series of reports issued annually that summarize the operating experience of U.S. nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure and radioactive effluents for each plant are presented. Summary highlights of these areas are discussed. The report includes 1976 data from 55 plants--23 boiling water reactor plants and 32 pressurized water reactor plants

  3. Cryogenic system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1992-01-01

    This report presents a review of cryogenic system operating experiences, from particle accelerator, fusion experiment, space research, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of cryogenic component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with cryogenic systems are discussed, including ozone formation, effects of spills, and modeling spill behavior. This information should be useful to fusion system designers and safety analysts, such as the team working on the International Thermonuclear Experimental Reactor design

  4. Efeito do tempo de experiência de operadores de Harvester no rendimento operacional Effect of time experience of Harvester operators in operating yield

    Directory of Open Access Journals (Sweden)

    Elaine Cristina Leonello

    2012-12-01

    Full Text Available A mecanização da colheita de madeira permite maior controle dos custos e pode proporcionar reduções em prazos relativamente curtos. Além disso, tem um lugar de destaque na humanização do trabalho florestal e no aumento do rendimento operacional. O presente trabalho teve por objetivo avaliar o desempenho de operadores de harvester em função do tempo de experiência na atividade. Foram avaliados oito operadores do sexo masculino, com idade entre 23 e 46 anos. O estudo consistiu na análise do volume de madeira colhida pelo harvester. O tempo de experiência afeta significativamente o rendimento operacional dos operadores de harvester. Tal rendimento aumenta expressivamente nos primeiros 18 meses de experiência, mantendo-se em ascensão nos próximos 26 meses. Após os 44 meses de experiência, o rendimento dos operadores tende a reduzir, revelando as possíveis acomodações do cotidiano. Tais resultados permitem concluir que por volta dos 50 meses de experiência na atividade de operação de harvester, se faz necessária a adoção de medidas de reciclagem, motivação, entre outras, a fim de proporcionar aos operadores melhores condições de trabalho que os possibilitem continuar exercendo a atividade de forma eficiente e rentável à empresa.The mechanization of timber harvesting allows greater control of costs and can provide reductions in relatively short intervals. Moreover, it has a place in the humanization of the working forest and the increase in performance. This work provides comparisons of operating performance of different operator harvester according to the time of experience in the activity. The operators evaluated were eight males, aged between 23 and 46 years old. The study consisted of analysis of the volume of timber harvested by the harvester. The experience significantly affects the performance of harvesters operators. The performance increases significantly in the first 18 months of experience, and it remained on

  5. Stack Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2009-01-01

    Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative 'all modes' failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

  6. 14th Biennial conference on reactor operating experience plant operations: The human element

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Separate abstracts were prepared for the papers presented in the following areas of interest: enhancing operator performance; structured approaches to maintenance standards and reliability-centered maintenance; human issues in plant operations and management; test, research, and training reactor utilization; methods and applications of root-cause analysis; emergency operating procedure enhancement programs; test, research, and training reactor upgrades; valve maintenance and diagnostics; recent operating experiences; and current maintenance issues

  7. US nuclear power plant operating cost and experience summaries

    International Nuclear Information System (INIS)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov)

  8. US nuclear power plant operating cost and experience summaries

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  9. European Clearinghouse for Nuclear Power Plants Operational Experience Feedback

    International Nuclear Information System (INIS)

    Martin Ramos, M.; Noel, M.

    2010-01-01

    In the European Union, in order to support the Community activities on operational experience, a centralized regional network on nuclear power plants operational experience feedback (European Clearinghouse on Operational Experience Feedback for Nuclear Power Plants) was established in 2008 at the EC JRC-IE, Petten (The Netherlands) on request of nuclear Safety Authorities of several Member States. Its main goal is to improve the communication and information sharing on OEF, to promote regional collaboration on analyses of operational experience and dissemination of the lessons learned. The enlarged EU Clearinghouse was launched in April 2010, and it is currently gathering the Regulatory Authorities of Finland, Hungary, Lithuania, the Netherlands, Romania, Slovenia, Switzerland, Bulgaria, Czec Republic, France, Germany, Slovak Republic, and Spain (these last six countries as observers). The OECD Nuclear Energy Agency, the IAEA, the EC Directorates General of the JRC and ENER are also part of the network. Recently, collaboration between some European Technical Support Organizations (such IRSN and GRS) and the EU Clearinghouse has been initiated. This paper explains in detail the objectives and organization of the EU Clearinghouse, as well as the most relevant activities carried out, like research work in trend analysis of events ocurred in NPP, topical reports on particular events, dissemination of the results, quarterly reports on events reported publicly and operational experience support to the members of the EU Clearinghouse. (Author)

  10. Fort Saint Vrain operational experience

    International Nuclear Information System (INIS)

    Fuller, C.H.

    1989-01-01

    Fort St. Vrain (FSV), on the system of the Public Service Company of Colorado, is the only high temperature gas-cooled (HTGR) power reactor in the United States. The plant features a helium-cooled reactor with a uranium-thorium fuel cycle. The paper describes the experience made during its operation. (author). 2 refs, 4 figs, 2 tabs

  11. Comparing PRAs with operating experience

    International Nuclear Information System (INIS)

    Picard, R.R.; Martz, H.F.

    1998-01-01

    Probabilistic Risk Assessment is widely used to estimate the frequencies of rare events, such as nuclear power plant accidents. An obvious question concerns the extent to which PRAs conform to operating experience--that is, do PRAs agree with reality? The authors discuss a formal methodology to address this issue and examine its performance using plant-specific data

  12. Operating experience of vault type dry storage and its relevance to future storage needs

    International Nuclear Information System (INIS)

    Maxwell, E.O.; Deacon, D.

    1982-01-01

    An outline description of the early passive cooled vault type dry stores for irradiated magnox fuel at the Wylfa Nuclear Power Station together with the valuable operating experience gained over many years. An outline description of the world's first air-cooled vault type dry store (350 Te) and comments on its construction and successful operation. A description of the basic principles that were used in the design of this store and how these principles have been developed for use on vault type storage systems for oxide fuel and vitrified waste. An examination of the basic parameters that the author's consider should be used to measure the adequacy of the many storage options currently being considered around the world is included in order that a better assessment of the various systems may be obtained

  13. EBR-II: summary of operating experience

    International Nuclear Information System (INIS)

    Perry, W.H.; Leman, J.D.; Lentz, G.L.; Longua, K.J.; Olson, W.H.; Shields, J.A.; Wolz, G.C.

    1978-01-01

    Experimental Breeder Reactor II (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. The primary cooling system is a submerged-pool type. The early operation of the reactor successfully demonstrated the feasibility of a sodium-cooled fast breeder reactor operating as an integrated reactor, power plant, and fuel-processing facility. In 1967, the role of EBR-II was reoriented from a demonstration plant to an irradiation facility. Many changes have been made and are continuing to be made to increase the usefulness of EBR-II for irradiation and safety tests. A review of EBR-II's operating history reveals a plant that has demonstrated high availability, stable and safe operating characteristics, and excellent performance of sodium components. Levels of radiation exposure to the operating and maintenance workers have been low; and fission-gas releases to the atmosphere have been minimal. Driver-fuel performance has been excellent. The repairability of radioactive sodium components has been successfully demonstrated a number of times. Recent highlights include installation and successful operation of (1) the hydrogen-meter leak detectors for the steam generators, (2) the cover-gas-cleanup system and (3) the cesium trap in the primary sodium. Irradiations now being conducted in EBR-II include the run-beyond-cladding breach fuel tests for mixed-oxide and carbide elements. Studies are in progress to determine EBR-II's capability for conducting important ''operational safety'' tests. These tests would extend the need and usefulness of EBR-II into the 1980's

  14. Ventilation Systems Operating Experience Review for Fusion Applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1999-01-01

    This report is a collection and review of system operation and failure experiences for air ventilation systems in nuclear facilities. These experiences are applicable for magnetic and inertial fusion facilities since air ventilation systems are support systems that can be considered generic to nuclear facilities. The report contains descriptions of ventilation system components, operating experiences with these systems, component failure rates, and component repair times. Since ventilation systems have a role in mitigating accident releases in nuclear facilities, these data are useful in safety analysis and risk assessment of public safety. An effort has also been given to identifying any safety issues with personnel operating or maintaining ventilation systems. Finally, the recommended failure data were compared to an independent data set to determine the accuracy of individual values. This comparison is useful for the International Energy Agency task on fusion component failure rate data collection

  15. Safety review of experiments at Albuquerque Operations Office

    International Nuclear Information System (INIS)

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  16. Two functions of early language experience.

    Science.gov (United States)

    Arshavsky, Yuri I

    2009-05-01

    The unique human ability of linguistic communication, defined as the ability to produce a practically infinite number of meaningful messages using a finite number of lexical items, is determined by an array of "linguistic" genes, which are expressed in neurons forming domain-specific linguistic centers in the brain. In this review, I discuss the idea that infants' early language experience performs two complementary functions. In addition to allowing infants to assimilate the words and grammar rules of their mother language, early language experience initiates genetic programs underlying language production and comprehension. This hypothesis explains many puzzling characteristics of language acquisition, such as the existence of a critical period for acquiring the first language and the absence of a critical period for the acquisition of additional language(s), a similar timetable for language acquisition in children belonging to families of different social and cultural status, the strikingly similar timetables in the acquisition of oral and sign languages, and the surprisingly small correlation between individuals' final linguistic competence and the intensity of their training. Based on the studies of microcephalic individuals, I argue that genetic factors determine not only the number of neurons and organization of interneural connections within linguistic centers, but also the putative internal properties of neurons that are not limited to their electrophysiological and synaptic properties.

  17. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    Energy Technology Data Exchange (ETDEWEB)

    Hastowo, Hudi; Tarigan, Alim [Multipurpose Reactor Center, National Nuclear Energy Agency of the Republic of Indonesia (PRSG-BATAN), Kawasan PUSPIPTEK Serpong, Tangerang (Indonesia)

    1999-08-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U{sub 3}O{sub 8}-Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  18. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    International Nuclear Information System (INIS)

    Hastowo, Hudi; Tarigan, Alim

    1999-01-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U 3 O 8 -Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  19. Operational experience with CMS Tier-2 sites

    International Nuclear Information System (INIS)

    Gonzalez Caballero, I

    2010-01-01

    In the CMS computing model, more than one third of the computing resources are located at Tier-2 sites, which are distributed across the countries in the collaboration. These sites are the primary platform for user analyses; they host datasets that are created at Tier-1 sites, and users from all CMS institutes submit analysis jobs that run on those data through grid interfaces. They are also the primary resource for the production of large simulation samples for general use in the experiment. As a result, Tier-2 sites have an interesting mix of organized experiment-controlled activities and chaotic user-controlled activities. CMS currently operates about 40 Tier-2 sites in 22 countries, making the sites a far-flung computational and social network. We describe our operational experience with the sites, touching on our achievements, the lessons learned, and the challenges for the future.

  20. Behavioral and neural plasticity caused by early social experiences: the case of the honeybee

    Directory of Open Access Journals (Sweden)

    Andrés eArenas

    2013-08-01

    Full Text Available Cognitive experiences during the early stages of life play an important role in shaping future behavior. Behavioral and neural long-term changes after early sensory and associative experiences have been recently reported in the honeybee. This invertebrate is an excellent model for assessing the role of precocious experiences on later behavior due to its extraordinarily tuned division of labor based on age polyethism. These studies are mainly focused on the role and importance of experiences occurred during the first days of the adult lifespan, their impact on foraging decisions and their contribution to coordinate food gathering. Odor-rewarded experiences during the first days of honeybee adulthood alter the responsiveness to sucrose, making young hive bees more sensitive to assess gustatory features about the nectar brought back to the hive and affecting the dynamic of the food transfers and the propagation of food-related information within the colony as well. Early olfactory experiences lead to stable and long-term associative memories that can be successfully recalled after many days, even at foraging ages. Also they improve memorizing of new associative learning events later in life. The establishment of early memories promotes stable reorganization of the olfactory circuits inducing structural and functional changes in the antennal lobe. Early rewarded experiences have relevant consequences at the social level too, biasing dance and trophallaxis partner choice and affecting recruitment. Here, we revised recent results in bees´ physiology, behavior and sociobiology to depict how the early experiences affect their cognition abilities and neural-related circuits.

  1. Vacuum system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1994-03-01

    This report presents a review of vacuum system operating experiences from particle accelerator, fusion experiment, space simulation chamber, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of vacuum system component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with vacuum systems are discussed, including personnel safety, foreign material intrusion, and factors relevant to vacuum systems being the primary confinement boundary for tritium and activated dusts. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  2. Mentalization mediates the relation between early traumatic experiences and aggressive behavior in adolescence

    Directory of Open Access Journals (Sweden)

    Taubner Svenja

    2013-01-01

    Full Text Available The aim of the study was to examine whether mentalization serves as a protective factor against aggressive behavior in adolescence in the context of early traumatization. We present data from a non-clinical sample of adolescents from Germany (n=97 and calculate a mediation model to test the link between early traumatic experiences and aggressive behavior with mentalizing skills as a mediator. Mentalization was assessed with the Reflective Functioning Scale on the Adult-Attachment-Interview and aggressive behavior was measured with the Reactive-Proactive-Aggression-Questionnaire. Traumatic experience was operationalized as physical and/or sexual abuse as reported in the Childhood Experience of Care and Abuse Questionnaire. Results show a complete mediation for Reflective Functioning on the relationship between early abuse and aggressive behavior. Thus, the findings of the study support an understanding of mentalizing as a protective factor for the relationship between early abusive experience and the development of aggressive behavior. Clinical implications are discussed.

  3. Spacelab operations planning. [ground handling, launch, flight and experiments

    Science.gov (United States)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  4. Early thinning experiments established by the Fort Valley Experimental Forest

    Science.gov (United States)

    Benjamin P. De Blois; Alex. J. Finkral; Andrew J. Sanchez Meador; Margaret M. Moore

    2008-01-01

    Between 1925 and 1936, the Fort Valley Experimental Forest (FVEF) scientists initiated a study to examine a series of forest thinning experiments in second growth ponderosa pine stands in Arizona and New Mexico. These early thinning plots furnished much of the early background for the development of methods used in forest management in the Southwest. The plots ranged...

  5. Operative Outcome and Patient Satisfaction in Early and Delayed Laparoscopic Cholecystectomy for Acute Cholecystitis

    Directory of Open Access Journals (Sweden)

    Aly Saber

    2014-01-01

    Full Text Available Introduction. Early laparoscopic cholecystectomy is usually associated with reduced hospital stay, sick leave, and health care expenditures. Early diagnosis and treatment of acute cholecystitis reduce both mortality and morbidity and the accurate diagnosis requires specific diagnostic criteria of clinical data and imaging studies. Objectives. To compare early versus delayed laparoscopic cholecystectomy regarding the operative outcome and patient satisfaction. Patients and Methods. Patients with acute cholecystitis were divided into two groups, early (A and delayed (B cholecystectomy. Diagnosis of acute cholecystitis was confirmed by clinical examination, laboratory data, and ultrasound study. The primary end point was operative and postoperative outcome and the secondary was patient’s satisfaction. Results. The number of readmissions in delayed treatment group B was three times in 10% of patients, twice in 23.3%, and once in 66.7% while the number of readmissions was once only in patients in group A and the mean total hospital stays were higher in group B than in group A. The overall patient’s satisfaction was 92.66±6.8 in group A compared with 75.34±12.85 in group B. Conclusion. Early laparoscopic cholecystectomy resulted in significant reduction in length of hospital stay and accepted rate of operative complications and conversion rates when compared with delayed techniques.

  6. Early and late outcomes of 1000 minimally invasive aortic valve operations.

    Science.gov (United States)

    Tabata, Minoru; Umakanthan, Ramanan; Cohn, Lawrence H; Bolman, Ralph Morton; Shekar, Prem S; Chen, Frederick Y; Couper, Gregory S; Aranki, Sary F

    2008-04-01

    Minimal access cardiac valve surgery is increasingly utilized. We report our 11-year experience with minimally invasive aortic valve surgery. From 07/96 to 12/06, 1005 patients underwent minimally invasive aortic valve surgery. Early and late outcomes were analyzed. Median patient age was 68 years (range: 24-95), 179 patients (18%) were 80 years or older, 130 patients (13%) had reoperative aortic valve surgery, 86 (8.4%) had aortic root replacement, 62 (6.1%) had concomitant ascending aortic replacement, and 26 (2.6%) had percutaneous coronary intervention on the day of surgery (hybrid procedure). Operative mortality was 1.9% (19/1005). The incidences of deep sternal wound infection, pneumonia and reoperation for bleeding were 0.5% (5/1005), 1.3% (13/1005) and 2.4% (25/1005), respectively. Median length of stay was 6 days and 733 patients (72%) were discharged home. Actuarial survival was 91% at 5 years and 88% at 10 years. In the subgroup of the elderly (> or =80 years), operative mortality was 1.7% (3/179), median length of stay was 8 days and 66 patients (37%) were discharged home. Actuarial survival at 5 years was 84%. There was a significant decreasing trend in cardiopulmonary bypass time, the incidence of bleeding, and operative mortality over time. Minimal access approaches in aortic valve surgery are safe and feasible with excellent outcomes. Aortic root replacement, ascending aortic replacement, and reoperative surgery can be performed with these approaches. These procedures are particularly well-tolerated in the elderly.

  7. Operation experience with elevated ammonia

    International Nuclear Information System (INIS)

    Vankova, Katerina; Kysela, Jan; Malac, Miroslav; Petrecky, Igor; Svarc, Vladimir

    2011-01-01

    The 10 VVER units in the Czech and Slovak Republics are all in very good water chemistry and radiation condition, yet questions have arisen regarding the optimization of cycle chemistry and improved operation in these units. To address these issues, a comprehensive experimental program for different water chemistries of the primary circuit was carried out at the Rez Nuclear Research Institute, Czech Republic, with the goal of judging the influence of various water chemistries on radiation build-up. Four types of water chemistries were compared: standard VVER water chemistry (in common use), direct hydrogen dosing without ammonia, standard VVER water chemistry with elevated ammonia levels, and zinc dosing to standard VVER water chemistry. The test results showed that the types of water chemistry other than the common one have benefits for the operation of the nuclear power plant (NPP) primary circuit. Operation experience with elevated ammonia at NPP Dukovany Units 3 and 4 is presented which validates the experimental results, demonstrating improved corrosion product volume activity. (orig.)

  8. Operational experience feedback with precursor analysis

    International Nuclear Information System (INIS)

    Koncar, M.; Ferjancic, M.; Muehleisen, A.; Vojnovic, D.

    2003-01-01

    Experience of practical operation is a valuable source of information for improving the safety and reliability of nuclear power plants. Operational experience feedback (Olef) system manages this aspect of NPP operation. The traditional ways of investigating operational events, such as the root cause analysis (RCA), are predominantly qualitative. RCA as a part of the Olef system provides technical guidance and management expectations in the conduct of assessing the root cause to prevent recurrence, covering the following areas: conditions preceding the event, sequence of events, equipment performance and system response, human performance considerations, equipment failures, precursors to the event, plant response and follow-up, radiological considerations, regulatory process considerations and safety significance. The root cause of event is recognized when there is no known answer on question 'why has it happened?' regarding relevant condition that may have affected the event. At that point the Olef is proceeding by actions taken in response to events, utilization, dissemination and exchange of operating experience information and at the end reviewing the effectiveness of the Olef. Analysis of the event and the selection of recommended corrective/preventive actions for implementation and prioritization can be enhanced by taking into account the information and insights derived from Pasa-based analysis. A Pasa based method, called probabilistic precursor event analysis (PPE A) provides a complement to the RCA approach by focusing on how an event might have developed adversely, and implies the mapping of an operational event on a probabilistic risk model of the plant in order to obtain a quantitative assessment of the safety significance of the event PSA based event analysis provides, due to its quantitative nature, appropriate prioritization of corrective actions. PPEA defines requirements for PSA model and code, identifies input requirements and elaborates following

  9. The Other Shoe: An Early Operant Conditioning Chamber for Pigeons.

    Science.gov (United States)

    Sakagami, Takayuki; Lattal, Kennon A

    2016-05-01

    We describe an early operant conditioning chamber fabricated by Harvard University instrument maker Ralph Gerbrands and shipped to Japan in 1952 in response to a request of Professor B. F. Skinner by Japanese psychologists. It is a rare example, perhaps the earliest still physically existing, of such a chamber for use with pigeons. Although the overall structure and many of the components are similar to contemporary pigeon chambers, several differences are noted and contrasted to evolutionary changes in this most important laboratory tool in the experimental analysis of behavior. The chamber also is testimony to the early internationalization of behavior analysis.

  10. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  11. Experiments on the Impact of language Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    International Nuclear Information System (INIS)

    Kang, Seongkeun; Kim, Taehoon; Seong, Poong Hyun; Ha, Jun Su

    2016-01-01

    In 2010, The Korea Electric Power Corporation (KEPCO) was awarded a multi-billion dollar bid to construct the first nuclear power plant in Barakah, UAE. One must keep in mind however, that with technology transfer and international cooperation comes a host of potential problems arising from cultural differences such as language, everyday habitudes and workplace expectation. As of now, how problematic these potential issues may become is unknown. Of the aforementioned factors, communication is perhaps of foremost importance. We investigated UAE culture-related issues through analysis of operating experience reviews (OERs) and came to the conclusion that the language barrier needed utmost attention. Korean nuclear power plant operators will work in UAE and will operate the NPPs with operators and managers of other nationalities as well. The purpose of this paper is firstly to confirm that operators are put under mental stress, and secondly to demonstrate the decline in accuracy when they must work in English. Reducing human error is quite important to make nuclear power plants safer. As the mental workload of human operator is increased, the probability of a human error occurring also increases. It will have a negative influence on the plant’s safety. There are many factors which can potentially increase mental workload. We focused on communication problem which is a key factor of increasing mental workload because many Korean operators will work in UAE nuclear power plants and may work together with UAE operators. From these experiments we compared how performance of both Korean and UAE subjects were decreased when they use English. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To

  12. Power ramping/cycling experience and operational recommendations in KWU power plants

    International Nuclear Information System (INIS)

    Jan, R. von; Wunderlich, F.; Holzer, R.

    1980-01-01

    The power cycling and ramping experience of KWU is based on experiments in test and commercial reactors, and on evaluation of plant operation (PHWR, PWR and BWR). Power cycling of fuel rods have never lead to PCI failures. In ramping experiments, for fast ramps PCI failure thresholds of 480/420 W/cm are obtained at 12/23 GWd/t(U) burn-up for pressurized PWR fuel. No failures occurred during limited exceedance of the threshold with reduced ramp rate. Operational recommendations used by KWU are derived from experiments and plant experience. The effects of ramping considerations on plant operation is discussed. No rate restrictions are required for start-ups during an operating cycle or load follow operation within set limits for the distortion of the local power distribution. In a few situations, e.g. start-up after refueling, ramp rates of 1 to 5 %/h are recommended depending on plant and fuel design

  13. Operating procedures: Fusion Experiments Analysis Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  14. Operating procedures: Fusion Experiments Analysis Facility

    International Nuclear Information System (INIS)

    Lerche, R.A.; Carey, R.W.

    1984-01-01

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility

  15. From USA operation experience of industrial uranium-graphite reactors

    International Nuclear Information System (INIS)

    Burdakov, N.S.

    1996-01-01

    The review on materials, presented by a group of the USA specialists at the seminar in Moscow on October 9-11, 1995 is considered. The above specialists shared their experience in operation of the Hanford industrial reactors, aimed at plutonium production for atomic bombs. The purpose of the above visit consisted in providing assistance to the Russian specialists by evaluation and modernization of operational conditions safety improvement of the RBMK type reactors. Special attention is paid to the behaviour of the graphite lining and channel tubes with an account of possible channel power interaction with the reactor structural units. The information on the experience of the Hanford reactor operation may be useful for specialists, operating the RBMK type reactors

  16. Are behavioral effects of early experience mediated by oxytocin?

    Directory of Open Access Journals (Sweden)

    Karen Lisa Bales

    2011-05-01

    Full Text Available Early experiences can alter adaptive emotional responses necessary for social behavior as well as physiological reactivity in the face of challenge. In the highly social prairie vole (Microtus ochrogaster, manipulations in early life or hormonal treatments specifically targeted at the neuropeptides oxytocin (OT and arginine vasopressin (AVP, have long-lasting, often sexually-dimorphic, consequences for social behavior. Here we examine the hypothesis that behavioral changes associated with differential early experience, in this case handling the family during the first week of life, may be mediated by changes in OT or AVP or their brain receptors. Four early treatment groups were used, differing only in the amount of manipulation received during the first week of life. MAN1 animals were handled once on post-natal day 1; MAN1 treatment produces a pattern of behavior usually considered typical of this species, against which other groups were compared. MAN 1-7 animals were handled once a day for post-natal days 1-7, MAN 7 animals were handled once on post-natal day 7, and MAN0 animals received no handling during the first week of life. When tested following weaning, males in groups that had received manipulation during the first few days of life (MAN1 and MAN1-7 displayed higher alloparenting than other groups. Neuroendocrine measures, including OT receptor binding and OT and AVP immunoreactivity, varied by early treatment. In brain areas including the nucleus accumbens, bed nucleus of stria terminalis and lateral septum, MAN0 females showed increased OT receptor binding. MAN1 animals also displayed higher numbers of immunoreactive OT cell bodies in the supraoptic nucleus. Taken together these findings support the broader hypothesis that experiences in the first few days of life, mediated in part by sexually-dimorphic changes in neuropeptides, especially in the receptor for OT, may have adaptive consequences for sociality and emotion regulation.

  17. Incidence of Early Post Operative Infection after Primary Total Knee ...

    African Journals Online (AJOL)

    Incidence of Early Post Operative Infection after. Primary Total Knee Arthroplasty at an East African. Centre. Kigera JWM1, Kimpiatu P2. 1. School of Medicine, University of Nairobi. 2. PCEA Kikuyu Hospital. Correspondence to: Dr James Kigera, P.O Box 30197 – 00100 Nairobi. Email: jameskigera@yahoo.co.uk. Abstract.

  18. GNF2 Operating Experience

    International Nuclear Information System (INIS)

    Schardt, John

    2007-01-01

    GNF's latest generation fuel product, GNF2, is designed to deliver improved nuclear efficiency, higher bundle and cycle energy capability, and more operational flexibility. But along with high performance, our customers face a growing need for absolute fuel reliability. This is driven by a general sense in the industry that LWR fuel reliability has plateaued. Too many plants are operating with fuel leakers, and the impact on plant operations and operator focus is unacceptable. The industry has responded by implementing an INPO-coordinated program aimed at achieving leaker-free reliability by 2010. One focus area of the program is the relationship between fuel performance (i.e., duty) and reliability. The industry recognizes that the right balance between performance and problem-free fuel reliability is critical. In the development of GNF2, GNF understood the requirement for a balanced solution and utilized a product development and introduction strategy that specifically addressed reliability: evolutionary design features supported by an extensive experience base; thoroughly tested components; and defense-in-depth mitigation of all identified failure mechanisms. The final proof test that the balance has been achieved is the application of the design, initially through lead use assemblies (LUAs), in a variety of plants that reflect the diversity of the BWR fleet. Regular detailed surveillance of these bundles provides the verification that the proper balance between performance and reliability has been achieved. GNF currently has GNF2 lead use assemblies operating in five plants. Included are plants that have implemented extended power up-rates, plants on one and two-year operating cycles, and plants with and without NobleChem TM and zinc injection. The leading plant has undergone three pool-side inspections outages to date. This paper reviews the actions taken to insure GNF2's reliability, and the lead use assembly surveillance data accumulated to date to validate

  19. Operational experience at Fort St. Vrain

    Energy Technology Data Exchange (ETDEWEB)

    Bramblett, G. C.; Fisher, C. R.; Swart, F. E. [General Atomic Co., San Diego, CA (USA)

    1981-01-15

    The Fort St. Vrain (FSV) station, a 330-MW(e) single reheat steam cycle powered by a high-temperature gas-cooled reactor (HTGR), is the first HTGR to enter commercial operation. Designed and built by General Atomic Company (GA), the plant is owned and operated by Public Service Company of Colorado (PSC). Many unique design features have been incorporated into this reactor system, including high-pressure helium as the primary system coolant, a graphite-moderated prismatic block core design, fission-product-containing carbide coatings on both fissile and fertile fuel particles, steam-driven helium circulators turning on water bearings, and once-through steam generators. All of these systems are contained in a prestressed concrete reactor vessel (PCRV). Extensive testing has been conducted during the rise to power following first criticality early in 1974 to verify system design performance. During this period, the plant has operated at power levels up to 70% and produced over one billion kilowatt hours of electricity. In 1979, the first refueling was conducted in conjunction with an extensive in-core inspection, the addition of in-core instrumentation, and a planned removal of a circulator for inspection.

  20. LMFBR operational safety: the EBR-II experience

    International Nuclear Information System (INIS)

    Sackett, J.I.; Allen, N.L.; Dean, E.M.; Fryer, R.M.; Larson, H.A.; Lehto, W.K.

    1978-01-01

    The mission of the Experimental Breeder Reactor II (EBR-II) has evolved from that of a small LMFBR demonstration plant to a major irradiation-test facility. Because of that evolution, many operational-safety issues have been encountered. The paper describes the EBR-II operational-safety experience in four areas: protection-system design, safety-document preparation, tests of off-normal reactor conditions, and tests of elements with breached cladding

  1. The SM and MIR reactors operation experience

    International Nuclear Information System (INIS)

    Kuprienko, V.A.; Klinov, A.V.; Svyatkin, M.N.; Shamardin, V.K.

    1995-01-01

    The SM and MIR operation experience show that continuous work on the problem of ageing, in all its aspects, allows for prolongation of the research plant life cycle by several folds as compared to the initial project. The redesigned SM-3 reactor will operate for another 20 years. The similar result is expected from the MIR planned reconstruction which scope will be the topic of future presentations. (orig.)

  2. Recent operating experiences with steam generators in Japanese NPPs

    International Nuclear Information System (INIS)

    Yashima, Seiji

    1997-01-01

    In 1994, the Genkai-3 of Kyushu Electric Power Co., Inc. and the Ikata-3 of Shikoku Electric Power Co., Inc. started commercial operation, and now 22 PWR plants are being operated in Japan. Since the first PWR plant now 22 PWR plants are being operated in was started to operate, Japanese PWR plants have had an operating experience of approx. 280 reactor-years. During that period, many tube degradations have been experienced in steam generators (SGs). And, in 1991, the steam generator tube rupture (SGTR) occurred in the Mihama-2 of Kansai Electric Power Co., Inc. However, the occurrence of tube degradation of SGs has been decreased by the instructions of the MITI as regulatory authorities, efforts of Electric Utilities, and technical support from the SG manufacturers. Here the author describes the recent SGs in Japan about the following points. (1) Recent Operating Experiences (2) Lessons learned from Mihama-2 SGTR (3) SG replacement (4) Safety Regulations on SG (5) Research and development on SG

  3. Helium turbomachinery operating experience from gas turbine power plants and test facilities

    International Nuclear Information System (INIS)

    McDonald, Colin F.

    2012-01-01

    The closed-cycle gas turbine, pioneered and deployed in Europe, is not well known in the USA. Since nuclear power plant studies currently being conducted in several countries involve the coupling of a high temperature gas-cooled nuclear reactor with a helium closed-cycle gas turbine power conversion system, the experience gained from operated helium turbomachinery is the focus of this paper. A study done as early as 1945 foresaw the use of a helium closed-cycle gas turbine coupled with a high temperature gas-cooled nuclear reactor, and some two decades later this was investigated but not implemented because of lack of technology readiness. However, the first practical use of helium as a gas turbine working fluid was recognized for cryogenic processes, and the first two small fossil-fired helium gas turbines to operate were in the USA for air liquefaction and nitrogen production facilities. In the 1970's a larger helium gas turbine plant and helium test facilities were built and operated in Germany to establish technology bases for a projected future high efficiency large nuclear gas turbine power plant concept. This review paper covers the experience gained, and the lessons learned from the operation of helium gas turbine plants and related test facilities, and puts these into perspective since over three decades have passed since they were deployed. An understanding of the many unexpected events encountered, and how the problems, some of them serious, were resolved is important to avoid them being replicated in future helium turbomachines. The valuable lessons learned in the past, in many cases the hard way, particularly from the operation in Germany of the Oberhausen II 50 MWe helium gas turbine plant, and the technical know-how gained from the formidable HHV helium turbine test facility, are viewed as being germane in the context of current helium turbomachine design work being done for future high efficiency nuclear gas turbine plant concepts. - Highlights:

  4. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)

  5. Operational Regimes of the National Spherical Torus Experiment

    International Nuclear Information System (INIS)

    Mueller, D.; Bell, M.G.; Bell, R.E.; Bitter, M.; Bigelow, T.; Bonoli, P.; Carter, M.; Ferron, J.; Fredrickson, E.; Gates, D.; Grisham, L.; Hosea, J.C.; Johnson, D.; Kaita, R.; Kaye, S.M.; Kugel, H.; LeBlanc, B.P.; Maingi, R.; Majeski, R.; Maqueda, R.; Menard, J.; Ono, M.; Paoletti, F.; Paul, S.; Phillips, C.K.; Pinsker, R.; Raman, R.; Sabbagh, S.A.; Skinner, C.H.; Soukhanovskii, V.A; Stutman, D.; Swain, D.; Takase, Y.; Wilgen, J.; Wilson, J.R.; Wurden, G.A.; Zweben, S.

    2002-01-01

    The National Spherical Torus Experiment (NSTX) is a proof-of-principle experiment designed to study the physics of Spherical Tori (ST), i.e., low-aspect-ratio toroidal plasmas. Important issues for ST research are whether the high-eta stability and reduced transport theoretically predicted for this configuration can be realized experimentally. In NSTX, the commissioning of a digital real-time plasma control system, the provision of flexible heating systems, and the application of wall conditioning techniques were instrumental in achieving routine operation with good confinement. NSTX has produced plasmas with R/a ∼ 0.85 m/0.68 m, A ∼ 1.25, Ip * 1.1 MA, BT = 0.3-0.45 T, k * 2.2, d * 0.5, with auxiliary heating by up to 4 MW of High Harmonic Fast Waves, and 5 MW of 80 keV D0 Neutral Beam Injection (NBI). The energy confinement time in plasmas heated by NBI has exceeded 100 ms and a toroidal beta (bT = 2m0 /BT02, where BT0 is the central vacuum toroidal magnetic field) up to 22% has be en achieved. HHFW power of 2.3 MW has increased the electron temperature from an initial 0.4 keV to 0.9 keV both with and without producing a significant density rise in the plasma. The early application of both NBI and HHFW heating has slowed the penetration of the inductively produced plasma current, modifying the current profile and, thereby, the observed MHD stability

  6. Improving the Sharing and Use of Operating Experience Among Pressurized Heavy Water Reactors

    International Nuclear Information System (INIS)

    Llewellyn, Michael D.

    1998-01-01

    Effective use of operating experience is an essential and fundamental aspect of the business of improving safety and reliability of nuclear power plant. Operating experience is considered of such importance, that it is embedded as a fundamental element in the WANO mission statement: 'To maximise the safety and reliability of operation of nuclear power plants by exchanging information and encouraging communication, comparison, and emulation amongst its members'. The exchange of information on plant operating experience and lessons learned from events is at the core of our WANO mission and is an essential element of effective operating experience use. Recognizing this, WANO - AC has joined together with Canadian PHWR operators in a cooperative effort to further strengthen the sharing of the event information, and to facilitate communication of PHWR operating experience worldwide. The content of the paper is: 1. Discussion; 2. Expectation; 3. Improving use of operating experience; 4. Internalizing operating experience; 5. Summary; 6. Attachments. The three attachments deal with: - WANO event reporting guidelines; - Root cause investigation guidelines; - Example prevent events briefing sheet. The paper is completed with the five slides used in the oral presentation

  7. Operational experience of extreme wind penetrations

    Energy Technology Data Exchange (ETDEWEB)

    Estanqueiro, Ana [INETI/LNEG - National Laboratory for Energy and Geology, Lisbon (Portugal); Mateus, Carlos B. [Instituto de Meteorologia, Lisboa (Portugal); Pestana, Rui [Redes Energeticas Nacionais (REN), Lisboa (Portugal)

    2010-07-01

    This paper reports the operational experience from the Portuguese Power System during the 2009/2010 winter months when record wind penerations were observed: the instantaneous wind power penetration peaked at 70% of consumption during no-load periods and the wind energy accounted for more than 50% of the energy consumed for a large period. The regulation measures taken by the TSO are presented in the paper, together with the additional reserves operated for added system security. Information on the overall power system behavior under such extreme long-term wind power penetrations will also be addressed. (org.)

  8. Operational experience of the ATLAS accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Den Hartog, P K; Bogaty, J M; Bollinger, L M; Clifft, B E; Craig, S L; Harden, R E; Markovich, P; Munson, F H; Nixon, J M; Pardo, R C; Phillips, D R; Shepard, K W; Tilbrook, I R; Zinkmann, G P [Argonne National Lab., IL (USA). Physics Div.

    1990-02-01

    The ATLAS accelerator consists of a HVEC model FN tandem accelerator injecting into a linac of independently-phased niobium superconducting resonators. The accelerator provides beams with masses 6 {le} A {le} 127 and with energies ranging up to 20 MeV/A for the lightest ions and 4 MeV/A for the heaviest ions. Portions of the linac have been in operation since 1978 and, over the last decade, more than 35000 h of operating experience have been accumulated. The long-term stability of niobium resonators, and their feasibility for use in heavy-ion accelerators is now well established. (orig.).

  9. Operating experience on radiation reduction in the latest BWRs

    International Nuclear Information System (INIS)

    Ohsumi, K.; Uchida, S.; Aizawa, M.; Takagi, K.; Amano, O.; Yamashita, K.

    1988-01-01

    In Japan, BWR plants have been operated commercially since 1970, and the reduction of radiation exposure has been an important concern. The application of the procedure for reducing occupational exposure is incorporated in Japanese Improvement and Standardization Program for LWRs. No.2 and No.4 plants in Fukushima No.2 Nuclear Power Station were designed and constructed as the latest 1,100 MWe BWRs in conformity with the Improvement and Standardization Program. No.2 plant began the commercial operation in February, 1984, and experienced three times of the scheduled annual maintenance outage. No.4 plant began the commercial operation in September, 1987, and the first annual maintenance is scheduled from September, 1988. In this paper, discussion is focused on recent radiation reduction measures, that is the control of iron and nickel in primary coolant for reducing the radiation dose rate in primary systems, based on the experience with No.2 and No.4 plants. The design concept of a low radiation dose rate nuclear power plant, the experience on water chemistry in No.2 plant, the control of iron and nickel in No.4 plant operation and so on are reported. It is believed that these operation experiences contribute to the reduction of occupational exposure in BWR plants currently in operation and in future. (Kako, I.)

  10. Large remote manipulator operating and maintenance experience at IEM cell

    International Nuclear Information System (INIS)

    Hicks, D.F.; McGuinness, P.W.

    1985-01-01

    The Interim Examination and Maintenance (IEM) Cell at the Fast Flux Test Facility (FFTF) has two large Electro-Mechanical Manipulators (EMM's). These manipulators are used for cell operations (processing of reactor core components) as well as general cell maintenance. From our eleven years of operation and maintenance experience with these large EMM's, we have learned many lessons concerning manipulator design. This paper describes the IEM Cell EMM design features and discusses operating and maintenance experience at the IEM Cell

  11. Operation experience at the UWTF

    International Nuclear Information System (INIS)

    Ueno, Kazuhiro; Inada, Kameji; Ohmori, Kouji; Usui, Kazuya; Irinouchi, Sigenori; Asami, Makoto; Tohchi, Katsunori

    2003-01-01

    This report describes the operation experience on the volume reduction of metal wastes and used air filters contaminated with uranium at the Uranium contaminated Waste Treatment Facility (UWTF) in JNC Tokai Works. The UWTF consists of the metal waste treatment system and the filter-waste treatment system. The former treats metal wastes, the latter treats used air filters. Metal wastes are unpacked from drums, cut, and then compacted. Used air filters are separated into filter media and frames. Then the filter media are compacted and the frames are crushed. The operation of the UWTF was started in June 1998. The following volumes of wastes had been treated at the UWTF from the beginning of the operation to March 2003 (for about 5 years). (1) 1,524 drums of the metal wastes had been reduced to 410 drums. The volume reduction factor was 3.7. (2) 372 drums of the used air filters had been reduced to 39 drums. The volume reduction factor was 9.5. These systems have been operated without trouble for 5 years and have demonstrated to be able to reduce the volumes of the wastes to designed values. The volume reduction technologies for metal wastes and used air filters contaminated with uranium were successfully demonstrated at the UWTF. (author)

  12. Summary of operating experience at Swedish nuclear power plants in 1984

    International Nuclear Information System (INIS)

    1985-01-01

    The four owners on nuclear power plants in Sweden - The Swedish State Power Board, Forsmarks Kraftgrupp AB, Sydkraft AB and OKG AKTIEBOLAG - formed in 1980 the Nuclear Safety Board of the Swedish Utilities as a joint body for collaboration in safety matters. The Board participates in coordination of the safety work of the utilities and conducts its own safety projects, whereever this is more efficient than the utilities' working independently. The work of the Board shall contribute to optimizing safety in the operation of the Swedish nuclear power plants. The most important function of the Board is to collect, process and evaluate information on operational disturbances and incidents at Swedish and foreign nuclear power plants and then use the knowledge thus gained to improve the safety of the operation of the Swedish nuclear power plants (experience feedback). The work with Experience Feedback proceeds in three stages: Event follow-up, Fault analysis and Feedback of results. The Board runs a system for experience feedback (ERF). ERF is a computer-based information and communication system. ERF provides the Board with a daily update of operating experience in both Swedish and foreign nuclear power plants. Each Swedish nuclear power station supplies the ERF system with data on, among other things, operation and operational distrubances. Important experiences are thereby fed back to plant operation. Experience from foreign nuclear power stations can be of interest to the Swedish nuclear power plants. This information comes to RKS and is reviewed daily. The information that is considered relevant to Swedish plants is fed after analysis into the ERF system. Conversely, foreign nuclear power stations can obtain information from the operation of the Swedish plants. (author)

  13. Experience from operating germanium detectors in GERDA

    Science.gov (United States)

    Palioselitis, Dimitrios; GERDA Collaboration

    2015-05-01

    Phase I of the Germanium Detector Array (GERDA) experiment, searching for the neutrinoless double beta (0νββ) decay of 76Ge, was completed in September 2013. The most competitive half-life lower limit for the 0νββ decay of 76Ge was set (T-0ν1/2 > 2.1 · 1025 yr at 90% C.L.). GERDA operates bare Ge diodes immersed in liquid argon. During Phase I, mainly refurbished semi-coaxial high purity Ge detectors from previous experiments were used. The experience gained with handling and operating bare Ge diodes in liquid argon, as well as the stability and performance of the detectors during GERDA Phase I are presented. Thirty additional new enriched BEGe-type detectors were produced and will be used in Phase II. A subgroup of these detectors has already been used successfully in GERDA Phase I. The present paper gives an overview of the production chain of the new germanium detectors, the steps taken to minimise the exposure to cosmic radiation during manufacturing, and the first results of characterisation measurements in vacuum cryostats.

  14. The VEPP-2000 Collider Control System: Operational Experience

    CERN Document Server

    Senchenko, A I; Lysenko, A P; Rogovsky, Yu A; Shatunov, P Yu

    2017-01-01

    The VEPP-2000 collider was commissioned and operated successfully in 2010-2013. During the operation the facility underwent continuous updates and experience in maintenance was acquired. Strong cooperation between the staff of the accelerator complex and the developers of the control system proved effective for implementing the necessary changes in a short time.

  15. Duke staff tap into a fund of operating experience

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The benefits of the Operating Experience Database (OEDB) allows employees of the nuclear industry to access a fund of operating experience data on-line in order to help them make appropriate management decisions concerning problem solving for various plant-based problems. Recent successful uses include fire protection system design, improving compliance with technical specifications, and reducing unnecessary trips in turbines. It is anticipated that OEDB may well be used in the Ukraine and Russia in the future. (UK)

  16. Experiments on the Impact of language Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Seongkeun; Kim, Taehoon; Seong, Poong Hyun [KAIST, Daejeon (Korea, Republic of); Ha, Jun Su [KUSTAR, Abu Dhabi (United Arab Emirates)

    2016-10-15

    In 2010, The Korea Electric Power Corporation (KEPCO) was awarded a multi-billion dollar bid to construct the first nuclear power plant in Barakah, UAE. One must keep in mind however, that with technology transfer and international cooperation comes a host of potential problems arising from cultural differences such as language, everyday habitudes and workplace expectation. As of now, how problematic these potential issues may become is unknown. Of the aforementioned factors, communication is perhaps of foremost importance. We investigated UAE culture-related issues through analysis of operating experience reviews (OERs) and came to the conclusion that the language barrier needed utmost attention. Korean nuclear power plant operators will work in UAE and will operate the NPPs with operators and managers of other nationalities as well. The purpose of this paper is firstly to confirm that operators are put under mental stress, and secondly to demonstrate the decline in accuracy when they must work in English. Reducing human error is quite important to make nuclear power plants safer. As the mental workload of human operator is increased, the probability of a human error occurring also increases. It will have a negative influence on the plant’s safety. There are many factors which can potentially increase mental workload. We focused on communication problem which is a key factor of increasing mental workload because many Korean operators will work in UAE nuclear power plants and may work together with UAE operators. From these experiments we compared how performance of both Korean and UAE subjects were decreased when they use English. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To

  17. Undergraduate surgical nursing preparation and guided operating room experience: A quantitative analysis.

    Science.gov (United States)

    Foran, Paula

    2016-01-01

    The aim of this research was to determine if guided operating theatre experience in the undergraduate nursing curricula enhanced surgical knowledge and understanding of nursing care provided outside this specialist area in the pre- and post-operative surgical wards. Using quantitative analyses, undergraduate nurses were knowledge tested on areas of pre- and post-operative surgical nursing in their final semester of study. As much learning occurs in nurses' first year of practice, participants were re-tested again after their Graduate Nurse Program/Preceptorship year. Participants' results were compared to the model of operating room education they had participated in to determine if there was a relationship between the type of theatre education they experienced (if any) and their knowledge of surgical ward nursing. Findings revealed undergraduates nurses receiving guided operating theatre experience had a 76% pass rate compared to 56% with non-guided or no experience (p nurses achieved a 100% pass rate compared to 53% with non-guided or no experience (p research informs us that undergraduate nurses achieve greater learning about surgical ward nursing via guided operating room experience as opposed to surgical ward nursing experience alone. Copyright © 2015 Elsevier Ltd. All rights reserved.

  18. Chemistry in water reactors: operating experience and new developments. 2 volumes

    International Nuclear Information System (INIS)

    1994-01-01

    These proceedings of the International conference on chemistry in water reactors (Operating experience and new developments), Volume 1, are divided into 8 sessions bearing on: (session 1) Primary coolant activity, corrosion products (5 conferences), (session 2) Dose reduction (4 conferences), (session 3) New developments (4 conferences), poster session: Primary coolant chemistry (16 posters), (session 4) Decontamination (5 conferences), poster session (2 posters), (session 5) BWR-Operating experience (3 conferences), (session 6) BWR-Modelling of operating experience (4 conferences), (session 7) BWR-Basic studies (4 conferences), (session 8) BWR-New technologies (3 conferences)

  19. Operational experience with the Daresbury accelerator tube

    International Nuclear Information System (INIS)

    Aitken, T.W.; Eastham, D.A.; Joy, T.; Leese, J.M.; Tait, N.R.S.; Thorn, R.

    1986-01-01

    Operational experience with the Daresbury MKI accelerator tube is reviewed with particular attention to conditioning and high voltage performance. The effects of surges and transients on the tube are described and lines of future development are discussed. (orig.)

  20. Early post-operative psychosocial and weight predictors of later outcome in bariatric surgery: a systematic literature review.

    Science.gov (United States)

    Hindle, A; de la Piedad Garcia, X; Brennan, L

    2017-03-01

    This is the first systematic review to synthesize the evidence concerning early post-operative variables predictive of later weight and psychosocial outcomes in bariatric surgery. Eight electronic databases for empirical studies were searched (1954 to 2016). Most of the 39 included studies reported solely on weight outcomes; eating and psychosocial outcomes were less common. A better early weight loss trajectory was the most consistent predictor of more successful medium-term weight outcome (≤24 months); however, its relationship to longer term weight loss maintenance is less certain. Early eating adaptation may be associated with later weight loss, but further research is needed. Evidence is lacking for associations between early adherence or early psychosocial variables and later outcome. In particular, the relationship between early post-operative depression and later weight remains unclear. Little research has considered early prediction of later eating or psychosocial outcomes. Consideration of mediating or moderating relationships is lacking. The body of evidence is limited, and synthesis is hampered by heterogeneity in the type and time at which predictors and outcomes are measured and quality of statistical reporting. Further research on prospective prediction of bariatric surgery outcome is needed to guide early post-operative intervention for those at greatest risk of poor outcomes. © 2017 World Obesity Federation.

  1. Experience in startup and operation of fast flux facility

    International Nuclear Information System (INIS)

    Moffitt, W.C.

    1980-01-01

    The testing program was structured to perform all testing under formal testing procedures with a test engineer as the test director and the plant operators operating the systems and equipment. This provided excellent training and experience for the operators in preparation for eventual reactor operation. Operations preparations for the testing and operation activities has consisted of academic training, formal on-the-job training including systems operation and examinations by persons with an expert knowledge on that portion of the plant, training at EBR-II and the High Temperature Sodium Facility for selected senior operators, operating procedure preparation, training on an FFTF Control Room operator training simulator, and formal written, oral and operating examinations

  2. Operational experience of the ATLAS accelerator

    International Nuclear Information System (INIS)

    Den Hartog, P.K.; Bogaty, J.M.; Bollinger, L.M.

    1989-01-01

    The ATLAS accelerator consists of a HVEC model FN tandem accelerator injecting into a linac of independently-phased niobium superconducting resonators. The accelerator provides beams with masses from 6≤A≤127 and with energies ranging up to 20 MeV/A for the lightest ions and 4 MeV/A for the heaviest ions. Portions of the linac have been in operation since 1978 and, over the last decade, more than 35,000 hours of operating experience have been accumulated. The long-term stability of niobium resonators, and their feasibility for use in heavy-ion accelerators is now well established. 11 refs., 3 figs., 1 tab

  3. Design and operating experiences with 50MW steam generator

    International Nuclear Information System (INIS)

    Kawara, M.; Yamaki, H.; Kanamori, A.; Tanaka, K.; Takahashi, T.

    1975-01-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  4. Design and operating experiences with 50MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Kawara, M; Yamaki, H; Kanamori, A; Tanaka, K; Takahashi, T

    1975-07-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  5. Medical students, early general practice placements and positive supervisor experiences.

    Science.gov (United States)

    Henderson, Margaret; Upham, Susan; King, David; Dick, Marie-Louise; van Driel, Mieke

    2018-03-01

    Introduction Community-based longitudinal clinical placements for medical students are becoming more common globally. The perspective of supervising clinicians about their experiences and processes involved in maximising these training experiences has received less attention than that of students. Aims This paper explores the general practitioner (GP) supervisor perspective of positive training experiences with medical students undertaking urban community-based, longitudinal clinical placements in the early years of medical training. Methods Year 2 medical students spent a half-day per week in general practice for either 13 or 26 weeks. Transcribed semi-structured interviews from a convenience sample of participating GPs were thematically analysed by two researchers, using a general inductive approach. Results Identified themes related to the attributes of participating persons and organisations: GPs, students, patients, practices and their supporting institution; GPs' perceptions of student development; and triggers enhancing the experience. A model was developed to reflect these themes. Conclusions Training experiences were enhanced for GPs supervising medical students in early longitudinal clinical placements by the synergy of motivated students and keen teachers with support from patients, practice staff and academic institutions. We developed an explanatory model to better understand the mechanism of positive experiences. Understanding the interaction of factors enhancing teaching satisfaction is important for clinical disciplines wishing to maintain sustainable, high quality teaching.

  6. PFR experience of bellows operating in sodium systems

    International Nuclear Information System (INIS)

    Hodgson, D.

    1980-01-01

    Although there was little operating experience with bellows in sodium systems available during the design phase of the UK 250 MWe prototype fast reactor, bellows were extensively utilised to seal valves and to overcome the problems of differential thermal movements in several important applications. However, because of this lack of operational experience in sodium and the non-availability of design codes it was considered prudent not to install bellows in situations where failure could possibly initiate events of unpredictable proportions, or in positions where replacement following failure would be extremely difficult i.e. involving complete shutdown of the reactor over an extended period (in excess of six months) and/or necessitate removal of large quantities of primary sodium from the reactor vessel. This paper describes some of the bellows units installed in the PFR and the performance achieved during six years of reactor operation

  7. Early clinical experience: do students learn what we expect?

    NARCIS (Netherlands)

    Helmich, E.; Bolhuis, S.; Laan, R.F.J.M.; Koopmans, R.T.C.M.

    2011-01-01

    CONTEXT: Early clinical experience is thought to contribute to the professional development of medical students, but little is known about the kind of learning processes that actually take place. Learning in practice is highly informal and may be difficult to direct by predefined learning outcomes.

  8. Early clinical experience : do students learn what we expect?

    NARCIS (Netherlands)

    Helmich, Esther; Bolhuis, Sanneke; Laan, Roland; Koopmans, Raymond

    CONTEXT Early clinical experience is thought to contribute to the professional development of medical students, but little is known about the kind of learning processes that actually take place. Learning in practice is highly informal and may be difficult to direct by predefined learning outcomes.

  9. Flooding PSA with Plant Specific Operating Experiences of Korean PWRs

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Yang, Joon Yull

    2006-01-01

    The purpose of this paper is to update the flooding PSA with Korean plant specific operating experience data and the appropriate estimation method for the flooding frequency to improve the PSA quality. The existing flooding PSA used the NPE (Nuclear Power Experience) database up to 1985 for the flooding frequency. They are all USA plant operating experiences. So an upgraded flooding frequency with Korean specific plant operation experience is required. We also propose a method of only using the PWR (Pressurized Water Reactor) data for the flooding frequency estimation in the case of the flooding area in the primary building even though the existing flooding PSA used both PWR and BWR (Boiled Water Reactor) data for all kinds of plant areas. We evaluate the CDF (Core Damage Frequency) with the modified flooding frequency and compare the results with that of the existing flooding PSA method

  10. Starting Smart: How Early Experiences Affect Brain Development. An Ounce of Prevention Fund Paper.

    Science.gov (United States)

    Ounce of Prevention Fund.

    Recent research has provided great insight into the impact of early experience on brain development. It is now believed that brain growth is highly dependent upon early experiences. Neurons allow communication and coordinated functioning among various brain areas. Brain development after birth consists of an ongoing process of wiring and rewiring…

  11. Lesson Learned from the Recent Operating Experience of Domestic Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Chang-Ju; Kim, Min-Chull; Koo, Bon-Hyun; Kim, Sang-Jae; Lee, Kyung-Won; Kim, Ji-Tae; Lee, Durk-Hun

    2007-01-01

    According to the public concerns, it seems that one of the main missions of a nuclear regulatory body is to collect operational experiences from various nuclear facilities, and to analyze their follow-up information. The extensive use of lessons learned from operating experiences to back fit safety systems, improve operator training and emergency procedures, and to focus more attention on human factors, safety culture and quality management systems are also desired. Collecting operational experiences has been mainly done regarding the incidents and major failures of components (so called 'event'), which usually demands lots of regulatory resources. This paper concentrates on new information, i.e. lesson learned from recent investigation results of domestic events which contain 5 years' experience. This information can induce many insights for improving operational safety of nuclear power plants (NPPs)

  12. Operating experience of Fugen-HWR in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, F [Reactor Regulation Division, Nuclear Safety Bureau, Science and Technology Agency, Tokyo (Japan)

    1991-04-01

    Fugen is a 165 MWe prototype heavy water reactor which mainly uses plutonium-uranium mixed oxide (MOX) fuel. Power Reactor and Nuclear Fuel Development Corporation (PNC) has taken responsibility for the advanced thermal reactor (ATR) project, with its name 'FUGEN' taken from the Buddhist God of Mercy. The project started in October 1967, to develop and establish the technology for this new type of reactor and to clarify MOX fuel performance in the reactor. Site construction began in December 1970 at Tsuruga and the plant commenced commercial operation on March 20, 1979. Since then, Fugen has been operated successfully for more than twelve years. The plant performance and reliability of this type of reactor has been demonstrated through the operation. All these operational experiences have contributed to the establishment of the ATR technology.

  13. Operating experience of Fugen-HWR in Japan

    International Nuclear Information System (INIS)

    Yoshino, F.

    1991-01-01

    Fugen is a 165 MWe prototype heavy water reactor which mainly uses plutonium-uranium mixed oxide (MOX) fuel. Power Reactor and Nuclear Fuel Development Corporation (PNC) has taken responsibility for the advanced thermal reactor (ATR) project, with its name 'FUGEN' taken from the Buddhist God of Mercy. The project started in October 1967, to develop and establish the technology for this new type of reactor and to clarify MOX fuel performance in the reactor. Site construction began in December 1970 at Tsuruga and the plant commenced commercial operation on March 20, 1979. Since then, Fugen has been operated successfully for more than twelve years. The plant performance and reliability of this type of reactor has been demonstrated through the operation. All these operational experiences have contributed to the establishment of the ATR technology

  14. The National Flood Interoperability Experiment: Bridging Resesarch and Operations

    Science.gov (United States)

    Salas, F. R.

    2015-12-01

    The National Weather Service's new National Water Center, located on the University of Alabama campus in Tuscaloosa, will become the nation's hub for comprehensive water resources forecasting. In conjunction with its federal partners the US Geological Survey, Army Corps of Engineers and Federal Emergency Management Agency, the National Weather Service will operationally support both short term flood prediction and long term seasonal forecasting of water resource conditions. By summer 2016, the National Water Center will begin evaluating four streamflow data products at the scale of the NHDPlus river reaches (approximately 2.67 million). In preparation for the release of these products, from September 2014 to August 2015, the National Weather Service partnered with the Consortium of Universities for the Advancement of Hydrologic Science, Inc. to support the National Flood Interoperability Experiment which included a seven week in-residence Summer Institute in Tuscaloosa for university students interested in learning about operational hydrology and flood forecasting. As part of the experiment, 15 hour forecasts from the operational High Resolution Rapid Refresh atmospheric model were used to drive a three kilometer Noah-MP land surface model loosely coupled to a RAPID river routing model operating on the NHDPlus dataset. This workflow was run every three hours during the Summer Institute and the results were made available to those engaged to pursue a range of research topics focused on flood forecasting (e.g. reservoir operations, ensemble forecasting, probabilistic flood inundation mapping, rainfall product evaluation etc.) Although the National Flood Interoperability Experiment was finite in length, it provided a platform through which the academic community could engage federal agencies and vice versa to narrow the gap between research and operations and demonstrate how state of the art research infrastructure, models, services, datasets etc. could be utilized

  15. Technician support for operation and maintenance of large fusion experiments: the tandem mirror experiment upgrade (TMX-U) approach

    International Nuclear Information System (INIS)

    Mattson, G.E.

    1983-01-01

    As experiments continue to grow in size and complexity, a few technicians will no longer be able to maintain and operate the complete experiment. Specialization is becoming the norm. Subsystems are becoming very large and complex, requiring a great deal of experience and training for technicians to become qualified maintenance/operation personnel. Formal in-house and off-site programs supplement on-the-job training to fulfill the qualification criteria. This paper presents the Tandem Mirror Experiment-Upgrade (TMX-U) approach to manpower staffing, some problems encountered, possible improvements, and safety considerations for the successful operation of a large experimental facility

  16. Caregiver Coaching Strategies for Early Intervention Providers: Moving toward Operational Definitions

    Science.gov (United States)

    Friedman, Mollie; Woods, Juliann; Salisbury, Christine

    2012-01-01

    Early intervention (EI) providers increasingly coach and collaborate with caregivers to strengthen and support caregiver-child interactions. The EI providers learning to coach other adults benefit from knowing what, exactly, they should do to support caregivers. This article serves two purposes. First, it proposes an operationally defined,…

  17. Operational experience of the Marcoule reactors; Experience d'exploitation des reacteurs de Marcoule

    Energy Technology Data Exchange (ETDEWEB)

    Conte, F [Commissariat a l' Energie Atomique, Centre de Production de Plutonium, Marcoule (France). Centre d' Etudes Nucleaires

    1963-07-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [French] Les resultats atteints apres trois ans de fonctionnement des reacteurs G-2/G-3 permettent une accumulation considerable de l'experience d'exploitation de ces reacteurs. Les principales originalites: - caisson en beton precontraint - chargement en marche - surveillance automatique des temperatures sont largement justifiees par l'exploitation actuelle. L'auteur confirme l'interet de ces solutions d'avant-garde et en tire des conclusions pour les etudes de futures centrales nucleaires. (auteur)

  18. JET modeling and control analysis for POET (PFX Operating Early Task)

    International Nuclear Information System (INIS)

    Maviglia, F.; Albanese, R.; Last, J.R.; Lomas, P.J.; Mattei, M.; Neto, A.C.; Riccardo, V.; Rimini, F.G.

    2013-01-01

    Highlights: ► New POET operational space Safely opened, and used in 2011/12 JET exp. campaign. ► Fully non-linear dynamic simulation to reproduce the effects of different iron saturation level and eddy currents. ► Early achievement of highly shaped plasma. ► Reduced initial limiter phase: lower thermal load for the new metallic ILW and fuel retention studies. -- Abstract: The aim of the PFX Operating Early Task (POET) was to obtain a highly shaped plasma and x-point formation in the early phases of the discharge. The PFX is an amplifier which feeds the central pancakes of the JET primary circuit. In the past it was possible to energize the PFX circuit only when the PFGC current, which feeds all the coils of the primary circuit, was already flowing in the same direction as the PFX current would have flowed, to avoid repulsive vertical forces which would tend to lift the top pancakes of the central solenoid, balanced only by the net weight of the upper part of the JET machine. In this paper the modeling activity performed to provide a more accurate estimate of the ejection forces acting on the upper coils in order to safely widen the operational space, by using two dimensional finite element electromagnetic models and the simulation of the performances of the actual controller algorithm on tracking the desired references of current are described. Finally will be presented the results of the implemented POET system, routinely used in JET in the 2011/2012 experimental campaigns, in terms of anticipation of x-point formation and enhanced system flexibility

  19. JET modeling and control analysis for POET (PFX Operating Early Task)

    Energy Technology Data Exchange (ETDEWEB)

    Maviglia, F., E-mail: francesco.maviglia@unirc.it [Associazione EURATOM-ENEA-CREATE, Univ. di Napoli Federico II, Via Claudio 21, 80125 Napoli (Italy); Albanese, R. [Associazione EURATOM-ENEA-CREATE, Univ. di Napoli Federico II, Via Claudio 21, 80125 Napoli (Italy); Last, J.R.; Lomas, P.J. [Euratom-CCFE, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); Mattei, M. [Association EURATOM-ENEA-CREATE, Seconda Università di Napoli, Aversa (CE) (Italy); Neto, A.C. [Ass. EURATOM-IST, Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, UTL, 1049-001 Lisboa (Portugal); Riccardo, V.; Rimini, F.G. [Euratom-CCFE, Culham Science Centre, OX14 3DB Abingdon (United Kingdom)

    2013-10-15

    Highlights: ► New POET operational space Safely opened, and used in 2011/12 JET exp. campaign. ► Fully non-linear dynamic simulation to reproduce the effects of different iron saturation level and eddy currents. ► Early achievement of highly shaped plasma. ► Reduced initial limiter phase: lower thermal load for the new metallic ILW and fuel retention studies. -- Abstract: The aim of the PFX Operating Early Task (POET) was to obtain a highly shaped plasma and x-point formation in the early phases of the discharge. The PFX is an amplifier which feeds the central pancakes of the JET primary circuit. In the past it was possible to energize the PFX circuit only when the PFGC current, which feeds all the coils of the primary circuit, was already flowing in the same direction as the PFX current would have flowed, to avoid repulsive vertical forces which would tend to lift the top pancakes of the central solenoid, balanced only by the net weight of the upper part of the JET machine. In this paper the modeling activity performed to provide a more accurate estimate of the ejection forces acting on the upper coils in order to safely widen the operational space, by using two dimensional finite element electromagnetic models and the simulation of the performances of the actual controller algorithm on tracking the desired references of current are described. Finally will be presented the results of the implemented POET system, routinely used in JET in the 2011/2012 experimental campaigns, in terms of anticipation of x-point formation and enhanced system flexibility.

  20. ATLAS Strip Detector: Operational Experience and Run1-> Run2 Transition

    CERN Document Server

    Nagai, Koichi; The ATLAS collaboration

    2014-01-01

    Large hadron collider was operated very successfully during the Run1 and provided a lot of opportunities of physics studies. It currently has a consolidation work toward to the operation at $\\sqrt{s}=14 \\mathrm{TeV}$ in Run2. The ATLAS experiment has achieved excellent performance in Run1 operation, delivering remarkable physics results. The SemiConductor Tracker contributed to the precise measurement of momentum of charged particles. This paper describes the operation experience of the SemiConductor Tracker in Run1 and the preparation toward to the Run2 operation during the LS1.

  1. Operating experience and corrective action program at Ontario Hydro Nuclear

    International Nuclear Information System (INIS)

    Collingwood, Barry; Turner, David

    1998-01-01

    This is a slide-based talk given at the COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. In the introduction there are presented the operating experience (OPEX) program of OHN, and the OPEX Program Mission, ensuring that the right information gets to the right staff at the right time. The OPEX Processes are analysed. These are: - Internal Corrective Action; - Inter-site Lesson Transfer; - External Lesson Transfer; - External Posting of OHN Events; - Internalizing Operating Experience. Steps in solving the Corrective Action Program are described: - Identify the Problem; - Notify Immediate Supervision/Manager; - Evaluate the Problem; - Correct the Problem; Monitor/Report Status. The Internal Corrective Action is then presented as a flowchart. The internalizing operating experience is presented under three aspects: - Communication; - Interface; - Training. The following items are discussed, respectively: peer meetings, department/section meetings, safety meetings, e-mail folders, newsletters and bulletin boards; work planning, pre-job briefings, supervisors' briefing cards; classroom initial and refresher (case studies), simulator, management courses. A diagram is presented showing the flow and treatment of information within OHN, centered on the weekly screening meetings. Finally, the corrective action processes are depicted in a flowchart and analysed in details

  2. Cognition and adjustment after late and early operation for ruptured aneurysm.

    Science.gov (United States)

    Sonesson, B; Ljunggren, B; Säveland, H; Brandt, L

    1987-09-01

    Does early aneurysm operation, while lowering the overall management mortality, result in an unacceptable morbidity in terms of increased cognitive disturbances and psychosocial maladjustment? The present study evaluates quality of life, degree of cognitive dysfunction, and adjustment of 93 patients with satisfactory neurological recoveries after operations for ruptured supratentorial aneurysms. All patients had been in neurological Grades I to III (Hunt and Hess) after subarachnoid hemorrhage (SAH). Fifty-five patients were operated upon during the acute state, i.e., within 72 hours after bleeding (early surgery = ES), and 38 patients had been subjected to late surgery (LS), i.e., were operated on 9 days or more after SAH. Each patient was subjected to a clinical interview and a comprehensive neuropsychological investigation. The time interval between SAH and assessment varied between 12 and 103 months (mean, 56 months). The results confirm that there are indication of cognitive malfunctioning and psychosocial disturbances of varying severity and distribution in patients who have undergone LS. The pattern and distribution of sequelae after LS did not differ substantially from that in patients subjected to ES. The results offer strong support to the concept that remaining disturbances in cognition are mainly related to the impact of the initial hemorrhage per se. In patients with anterior communicating artery aneurysms, a larger decrease in tempo and perceptual vigilance was noted, suggesting that the subfrontal midline structures are particularly involved in processes demanding flexibility, attention, and capacity to adapt to novel demands in a perceptual situation.

  3. Operating experience at CEBAF

    International Nuclear Information System (INIS)

    Legg, R.

    1996-01-01

    CEBAF, the Continuous Electron Beam Accelerator Facility, is a 5-pass, recirculating, superconducting rf linac designed to provide exceptional beam quality at 4 GeV up to 200 μA CW. It is made up of an injector, two 400-MeV linacs, and 9 recirculation arcs having a total beamline length of more than 4.5 km. On Nov. 5, 1995, CEBAF delivered a 4 GeV, 25-μA CW electron beam to the first of 3 experimental halls and the experimental physics program was started 10 days later. Accelerator availability during the first month of the experimental run exceeded 75%. Beam properties measured in the experimental hall to date are a one sigma momentum spread of 5x10 -5 and an rms emittance of 0.2 nanometer-radians, better than design specification. CW beam has been provided from all 5 passes at 800 MeV intervals. Outstanding performance of the superconducting linacs suggests a machine energy upgrade to 6 GeV in the near term with eventual machine operation at 8-10 GeV. Results from commissioning and operations experience since the last conference are presented

  4. Personal strengths and traumatic experiences among institutionalized children given up at birth (Les Enfants de Duplessis--Duplessis' children): I: Early experiences.

    Science.gov (United States)

    Perry, J Christopher; Sigal, John J; Boucher, Sophie; Paré, Nikolas; Ouimet, Marie Claude

    2005-12-01

    We examined childhood and early adult strengths and adverse experiences of a group of orphans given up at or near birth and raised in Quebec institutions into early adulthood. A follow-up interview of 81 adults (41 women, 40 men) at a mean age of 59.2 years included retrospective assessments of childhood experiences. Most participants reported multiple early adverse experiences, including, in descending order, unfair rules and excessive punishment, physical abuse, emotional neglect, witnessing violence, verbal abuse, physical neglect, sexual abuse, and serious illness. Adverse experiences were mainly due to lay caretakers, not peers or nuns. Twelve childhood strengths, such as self-protectiveness and athletic talent, were scored at each of four age periods, yielding a median score equivalent to one strength at each period. Over half had significant childhood attachments, but of limited intimacy. Childhood variables correlated with their respective variables in later adulthood. Overall, these older adults reported a high prevalence of adverse or traumatic childhood experiences, counterbalanced by modest levels of individual strengths and attachment relationships. Institutionalization of children--if unavoidable--must build in effective safeguards against adverse experiences.

  5. IRIS Mission Operations Director's Colloquium

    Science.gov (United States)

    Carvalho, Robert; Mazmanian, Edward A.

    2014-01-01

    Pursuing the Mysteries of the Sun: The Interface Region Imaging Spectrograph (IRIS) Mission. Flight controllers from the IRIS mission will present their individual experiences on IRIS from development through the first year of flight. This will begin with a discussion of the unique nature of IRISs mission and science, and how it fits into NASA's fleet of solar observatories. Next will be a discussion of the critical roles Ames contributed in the mission including spacecraft and flight software development, ground system development, and training for launch. This will be followed by experiences from launch, early operations, ongoing operations, and unusual operations experiences. The presentation will close with IRIS science imagery and questions.

  6. Early Taste Experiences and Later Food Choices

    Directory of Open Access Journals (Sweden)

    Valentina De Cosmi

    2017-02-01

    Full Text Available Background. Nutrition in early life is increasingly considered to be an important factor influencing later health. Food preferences are formed in infancy, are tracked into childhood and beyond, and complementary feeding practices are crucial to prevent obesity later in life. Methods. Through a literature search strategy, we have investigated the role of breastfeeding, of complementary feeding, and the parental and sociocultural factors which contribute to set food preferences early in life. Results. Children are predisposed to prefer high-energy, -sugar, and -salt foods, and in pre-school age to reject new foods (food neophobia. While genetically determined individual differences exist, repeated offering of foods can modify innate preferences. Conclusions. Starting in the prenatal period, a varied exposure through amniotic fluid and repeated experiences with novel flavors during breastfeeding and complementary feeding increase children’s willingness to try new foods within a positive social environment.

  7. Experience from operating germanium detectors in GERDA

    International Nuclear Information System (INIS)

    Palioselitis, Dimitrios

    2015-01-01

    Phase I of the Germanium Detector Array (GERDA) experiment, searching for the neutrinoless double beta (0νββ) decay of 76 Ge, was completed in September 2013. The most competitive half-life lower limit for the 0νββ decay of 76 Ge was set (T- 0ν 1/2 > 2.1 · 10 25 yr at 90% C.L.). GERDA operates bare Ge diodes immersed in liquid argon. During Phase I, mainly refurbished semi-coaxial high purity Ge detectors from previous experiments were used. The experience gained with handling and operating bare Ge diodes in liquid argon, as well as the stability and performance of the detectors during GERDA Phase I are presented. Thirty additional new enriched BEGe-type detectors were produced and will be used in Phase II. A subgroup of these detectors has already been used successfully in GERDA Phase I. The present paper gives an overview of the production chain of the new germanium detectors, the steps taken to minimise the exposure to cosmic radiation during manufacturing, and the first results of characterisation measurements in vacuum cryostats. (paper)

  8. The University of Colorado OSO-8 spectrometer experiment. IV - Mission operations

    Science.gov (United States)

    Hansen, E. R.; Bruner, E. C., Jr.

    1979-01-01

    The remote operation of two high-resolution ultraviolet spectrometers on the OSO-8 satellite is discussed. Mission operations enabled scientific observers to plan observations based on current solar data, interact with the observing program using real- or near real-time data and commands, evaluate quick-look instrument data, and analyze the observations for publication. During routine operations, experiments were planned a day prior to their execution, and the data from these experiments received a day later. When a shorter turnaround was required, a real-time mode was available. Here, the real-time data and command links into the remote control center were used to evaluate experiment operation and make satellite pointing or instrument configuration changes with a 1-90 minute turnaround.

  9. Operations experience with the NAC-1 legal weight truck cask

    International Nuclear Information System (INIS)

    Viebrock, J.M.; Hoffman, C.C.

    1978-01-01

    The first three years of operation of Nuclear Assurance Corporation's (NAC) four (4) NAC-1 Casks have demonstrated that shipments of spent fuel, fuel rods and other highly irradiated reactor components can be moved routinely by legal weight truck transport. Shipments of these materials have involved some 800,000 miles of highway travel and cask handling at some fifteen different nuclear facilities. This paper presents details on NAC's operations experience with these casks including cask description, cask handling (loading and unloading), pre-shipment testing, facility turnaround and transit times, operator exposure, transport vehicles and shipper/carrier/cask owner responsibilities, actual experience with regard to facility interfacing requirements and operational procedures. Cask and equipment utilization is discussed together with the methods used to control operation costs and to improve the economics of truck transport

  10. Early trauma, attachment experiences and comorbidities in schizophrenia

    Directory of Open Access Journals (Sweden)

    Thalita Gabínio

    2018-04-01

    Full Text Available Abstract Objective To evaluate attachment patterns in subjects with schizophrenia and their relationships to early traumatic events, psychotic symptoms and comorbidities. Methods Twenty patients diagnosed with schizophrenia according to criteria from the Diagnostic and Statistical Manual of Mental Disorders, 5th edition (DSM-5 underwent retrospective symptom assessment and careful assessment of the number and manner of childhood caregiver changes. The Diagnostic Interview for Psychosis and Affective Disorders (DI-PAD was used to assess symptoms related to schizophrenia (positive and negative symptoms, depression and mania. Anxiety disorder comorbidities were assessed by the Liebowitz Social Anxiety Scale (LSAS, Yale-Brown Obsessions and Compulsions Scale (Y-BOCS and Panic and Schizophrenia Interview (PaSI. Experience in Close Relationships – Relationship Structures (ECR-RS and Early Trauma Inventory Self Report-Short Form (ETISR-SF were used to assess attachment patterns and traumatic history, respectively. Results Moderate and significant correlations between attachment patterns and early trauma showed that greater severity of anxious attachment was predicted by a higher frequency of total early traumas (Spearman ρ = 0.446, p = 0.04, mainly general traumas (ρ = 0.526, p = 0.017; including parental illness and separation, as well as natural disaster and serious accidents. Among the correlations between early trauma and comorbid symptoms, panic attacks occurring before the onset of schizophrenia showed significant and positive correlations with ETISR-SF total scores and the sexual trauma subscale. Conclusion Children with an unstable early emotional life are more vulnerable to the development of psychopathology, such as panic anxiety symptoms. Traumatic events may also predict later schizophrenia.

  11. Effect of pre-operative methylprednisolone on orthostatic hypotension during early mobilization after total hip arthroplasty

    DEFF Research Database (Denmark)

    Lindberg-Larsen, V; Petersen, P B; Jans, Ø

    2018-01-01

    a standardized mobilization protocol pre-operatively, 6, and 24 h after surgery. Systolic and diastolic arterial pressure and heart rate were measured non-invasively (Nexfin® ). The systemic inflammation was monitored by the C-reactive protein (CRP) response. RESULTS: At 6 h post-operatively, 11 (38%) versus 11......BACKGROUND: Orthostatic hypotension (OH) and intolerance (OI) are common after total hip arthroplasty (THA) and may delay early mobilization. The pathology of OH and OI includes a dysregulated post-operative vasopressor response, by a hitherto unknown mechanism. We hypothesized that OI could...... be related to the inflammatory stress response which is inhibited by steroid administration. Consequently, this study evaluated the effect of a pre-operative high-dose methylprednisolone on OH and OI early after THA. METHODS: Randomized, double-blind, placebo-controlled study in 59 patients undergoing...

  12. Operational Features of the Kamehameha Early Education Project. Technical Report #4.

    Science.gov (United States)

    Gallimore, Ronald; And Others

    This report summarizes the operational features of the initial phases of the Kamehameha Early Education Project (KEEP). The rationale for KEEP's focus on conducting research on programs similar to those in the public schools rather than on developing radically innovative educational programs is discussed. Start up procedures such as recruitment of…

  13. Radiosurgery for acoustic neurinomas: Early experience

    International Nuclear Information System (INIS)

    Linskey, M.E.; Lunsford, L.D.; Flickinger, J.C.

    1990-01-01

    We reviewed our early experience with the first 26 patients with acoustic neurinomas (21 unilateral, 5 bilateral) treated by stereotactic radiosurgery using the first North American 201-source cobalt-60 gamma knife. Follow-up ranged from 6 to 19 months (median, 13 months). Serial postoperative imaging showed either a decrease in tumor size (11 patients) or growth arrest (15 patients). Loss of central contrast enhancement was a characteristic change (18 patients). Seven patients had good or serviceable hearing preoperatively. In all 7 the preoperative hearing status was retained immediately after radiosurgery. At follow-up, 3 had preserved hearing, 1 had reduced hearing, and 3 had lost all hearing in the treated ear. Hearing in 1 patient that was nonserviceable preoperatively later improved to a serviceable hearing level. Delayed facial paresis developed in 6 patients, and delayed trigeminal sensory loss developed in 7 patients, none of whom had significant deficits before radiosurgery. Both facial and trigeminal deficits tended to improve within 3 to 6 months of onset with excellent recovery anticipated. Lower cranial nerve dysfunction was not observed. All 26 patients remain at their preoperative employment or functional status. At present, stereotactic radiosurgery is an alternative treatment for acoustic neurinomas in patients who are elderly, have significant concomitant medical problems, have a tumor in their only hearing ear, have bilateral acoustic neurinomas, refuse microsurgical excision, or have recurrent tumor despite surgical resection. Although longer and more extensive follow-up is required, the control of tumor growth and the acceptable rate of complications in this early experience testifies to the future expanding role of this technique in the management of selected acoustic neurinomas

  14. Canadian fuel development program and recent operational experience

    International Nuclear Information System (INIS)

    Cox, D.S.; Kohn, E.; Lau, J.H.K.; Dicke, G.J.; Macici, N.N.; Sancton, R.W.

    1995-01-01

    This paper provides an overview of the current Canadian CANDU fuel R and D programs and operational experience. The details of operational experience for fuel in Canadian reactors are summarized for the period 1991-1994; excellent fuel performance has been sustained, with steady-state bundle defect rates currently as low as 0.02%. The status of introducing long 37-element bundles, and bundles with rounded bearing pads is reviewed. These minor changes in fuel design have been selectively introduced in response to operational constraints (end-plate cracking and pressure-tube fretting) at Ontario Hydro's Bruce-B and Darlington stations. The R and D programs are generating a more complete understanding of CANDU fuel behaviour, while the CANDU Owners Group (COG) Fuel Technology Program is being re-aligned to a more exclusive focus on the needs of operating stations. Technical highlights and realized benefits from the COG program are summarized. Re-organization of AECL to provide a one-company focus, with an outward looking view to new CANDU markets, has strengthened R and D in advanced fuel cycles. Progress in AECL's key fuel cycle programs is also summarized. (author)

  15. Study on application of operating experience to new nuclear power plant

    International Nuclear Information System (INIS)

    Hong, Nam Pyo

    1991-01-01

    From the standpoint of designing the nuclear power plant, nine operating units have been designed and constructed as turn-key base by foreign Nuclear Steam Supply System (NSSS) Suppliers or as component base by foreign Architect/Engineer companies. In case of the component base project, the owner of electric company generally has merits that owner's operational experiences can be effectively incorporated from the beginning stage of design by A/E. Even though six nuclear units, Kori Units 3 and 4, Yonggwang Units 1 and 2, and Ulchin Units 1 and 2, were designed as component base by foreign A/E's, operational experience feedback from Kori Unit 1, such as design improvement and system upgrade, could not be reflected, because the design process of the following units started well ahead before Kori Unit 1 operating experience is obtained enough to reflect on future nuclear power plant design. It can be stated that foreign A/E's used their experience in designing nuclear projects on very limited basis

  16. Modification of visual function by early visual experience.

    Science.gov (United States)

    Blakemore, C

    1976-07-01

    Physiological experiments, involving recording from the visual cortex in young kittens and monkeys, have given new insight into human developmental disorders. In the visual cortex of normal cats and monkeys most neurones are selectively sensitive to the orientation of moving edges and they receive very similar signals from both eyes. Even in very young kittens without visual experience, most neurones are binocularly driven and a small proportion of them are genuinely orientation selective. There is no passive maturation of the system in the absence of visual experience, but even very brief exposure to patterned images produces rapid emergence of the adult organization. These results are compared to observations on humans who have "recovered" from early blindness. Covering one eye in a kitten or a monkey, during a sensitive period early in life, produces a virtually complete loss of input from that eye in the cortex. These results can be correlated with the production of "stimulus deprivation amblyopia" in infants who have had one eye patched. Induction of a strabismus causes a loss of binocularity in the visual cortex, and in humans it leads to a loss of stereoscopic vision and binocular fusion. Exposing kittens to lines of one orientation modifies the preferred orientations of cortical cells and there is an analogous "meridional amblyopia" in astigmatic humans. The existence of a sensitive period in human vision is discussed, as well as the possibility of designing remedial and preventive treatments for human developmental disorders.

  17. Dissociation mediates the relationship between peer victimization and hallucinatory experiences among early adolescents

    Directory of Open Access Journals (Sweden)

    Syudo Yamasaki

    2016-06-01

    Full Text Available Peer victimization increases the risk of experiencing psychotic symptoms among clinical and general populations, but the mechanism underlying this association remains unclear. Dissociation, which is related to peer victimization and hallucinatory experiences, has been demonstrated as a significant mediator in the relation between childhood victimization and hallucinatory experience among adult patients with psychosis. However, no studies have examined the mediating effect of dissociation in a general early adolescent population. We examined whether dissociation mediates the relationship between peer victimization and hallucinatory experiences among 10-year-old adolescents using a population-based cross-sectional survey of early adolescents and their main parent (Tokyo Early Adolescence Survey; N = 4478. We examined the mediating effect of dissociation, as well as external locus of control and depressive symptoms, on the relationship between peer victimization and hallucinatory experiences using path analysis. The model assuming mediation effects indicated good model fit (comparative fit index = .999; root mean square error of approximation = .015. The mediation effect between peer victimization and hallucination via dissociation (standardized indirect effect = .038, p < .001 was statistically significant, whereas the mediation effects of depressive symptoms (standardized indirect effect = −.0066, p = 0.318 and external locus of control (standardized indirect effect = .0024, p = 0.321 were not significant. These results suggest that dissociation is a mediator in the relation between peer victimization and hallucinatory experiences in early adolescence. For appropriate intervention strategies, assessing dissociation and peer victimization as they affect hallucinatory experiences is necessary.

  18. Feedback of safety - related operational experience: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues.

  19. Feedback of safety - related operational experience: Lessons learned

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues

  20. Spanish Power Exchange Market Concepts and Operating Experience

    International Nuclear Information System (INIS)

    Gonzalez, J. J.; Gamito, C.

    2000-01-01

    On January, 1st, 1998, the Spanish Electricity Market started operations. All generators, distributors, commercialization companies, and final consumers negotiate al power exchanges either through the spot market or using bilateral contracts. The Spanish Power Exchange Market Operator (Compania Operadora del Mercado Espanol de electricidad, OMEL) is responsible for the management of the market and for the economic settlement and billing of a transactions on the Power Exchange market, and the technical operational process handled by the System Operator. This paper describes in detail the Spanish market principles and the experience gathered through the design, installation and first two years of market operation. The paper presents also the Spanish market results from January 1998 up to December 1999 indicating each specific market results and aggregate statistics. (Author)

  1. Coping with the challenges of early disaster response: 24 years of field hospital experience after earthquakes.

    Science.gov (United States)

    Bar-On, Elhanan; Abargel, Avi; Peleg, Kobi; Kreiss, Yitshak

    2013-10-01

    To propose strategies and recommendations for future planning and deployment of field hospitals after earthquakes by comparing the experience of 4 field hospitals deployed by The Israel Defense Forces (IDF) Medical Corps in Armenia, Turkey, India and Haiti. Quantitative data regarding the earthquakes were collected from published sources; data regarding hospital activity were collected from IDF records; and qualitative information was obtained from structured interviews with key figures involved in the missions. The hospitals started operating between 89 and 262 hours after the earthquakes. Their sizes ranged from 25 to 72 beds, and their personnel numbered between 34 and 100. The number of patients treated varied from 1111 to 2400. The proportion of earthquake-related diagnoses ranged from 28% to 67% (P earthquakes, patient caseload and treatment requirements varied widely. The variables affecting the patient profile most significantly were time until deployment, total number of injured, availability of adjacent medical facilities, and possibility of evacuation from the disaster area. When deploying a field hospital in the early phase after an earthquake, a wide variability in patient caseload should be anticipated. Customization is difficult due to the paucity of information. Therefore, early deployment necessitates full logistic self-sufficiency and operational versatility. Also, collaboration with local and international medical teams can greatly enhance treatment capabilities.

  2. Early Management Experience of Perforation after ERCP

    Directory of Open Access Journals (Sweden)

    Guohua Li

    2012-01-01

    Full Text Available Background and Aim. Perforation after endoscopic retrograde cholangiopancreatography (ERCP is a rare complication, but it is associated with significant mortality. This study evaluated the early management experience of these perforations. Patients and Methods. Between November 2003 and December 2011, a total of 8504 ERCPs were performed at our regional endoscopy center. Sixteen perforations (0.45% were identified and retrospectively reviewed. Results. Nine of these 16 patients with perforations were periampullary, 3 duodenal, 1 gastric fundus, and 3 patients had a perforation of an afferent limb of a Billroth II anastomosis. All patients with perforations were recognized during ERCP by X-ray and managed immediately. One patient with duodenal perforation and three patients with afferent limb perforation received surgery, others received medical conservative treatment which included suturing lesion, endoscopic nasobiliary drainage (ENBD, endoscopic retrograde pancreatic duct drainage (ERPD, gastrointestinal decompression, fasting, broad-spectrum antibiotics, and so on. All patients with perforation recovered successfully. Conclusions. We found that: (1 the diagnosis of perforation during ERCP may be easy, but you must pay attention to it. (2 Most retroperitoneal perforations can recover with only medical conservative treatment in early phase. (3 Most peritoneal perforations need surgery unless you can close the lesion up under endoscopy in early phase.

  3. Operating experience feedback report: Experience with pump seals installed in reactor coolant pumps manufactured by Byron Jackson

    International Nuclear Information System (INIS)

    Bell, L.G.; O'Reilly, P.D.

    1992-09-01

    This report examines the reactor coolant pump (RCP) seal operating experience through August 1990 at plants with Byron Jackson (B-J) RCPs. ne operating experience examined in this analysis included a review of the practice of continuing operation with a degraded seal. Plants with B-J RCPs that have had relatively good experience with their RCP seals attribute this success to a combination of different factors, including: enhanced seal QA efforts, modified/new seal designs, improved maintenance procedures and training, attention to detail, improved seal operating procedures, knowledgeable personnel involved in seal maintenance and operation, reduction in frequency of transients that stress the seals, seal handling and installation equipment designed to the appropriate precision, and maintenance of a clean seal cooling water system. As more plants have implemented corrective measures such as these, the number of B-J RCP seal failures experienced has tended to decrease. This study included a review of the practice of continued operation with a degraded seal in the case of PWR plants with Byron Jackson reactor coolant pumps. Specific factors were identified which should be addressed in order to safety manage operation of a reactor coolant pump with indications of a degrading seal

  4. Tore Supra: technical aspects and early results after one year of operation

    International Nuclear Information System (INIS)

    Gravier, R.

    1989-01-01

    After one year operation (1988 to 1989), technical aspects of component systems and equipment of Tore Supra are summarized. Particular attention is given to the operation with: supraconducting toroidal field coil system, cryogenic system, poloidal field system, in vessel equipment, first wall conditioning, pump limiter. The ergodic divertor experiments and the current drive experiment are reported. The plasma heating methods adopted in Tore Supra are presented

  5. Operating experience with nuclear power plants 2015. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2016-07-01

    The VGB Technical Committee ''Nuclear Plant Operation'' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2015, events important to plant safety, special and relevant repair, and retrofit measures from Germany. The second part of this report will focus on nuclear power plant in Belgium, Finland, the Netherlands, Switzerland, and Spain.

  6. Early Life Experiences and Exercise Associate with Canine Anxieties.

    Science.gov (United States)

    Tiira, Katriina; Lohi, Hannes

    2015-01-01

    Personality and anxiety disorders across species are affected by genetic and environmental factors. Shyness-boldness personality continuum exists across species, including the domestic dog, with a large within- and across-breed variation. Domestic dogs are also diagnosed for several anxiety-related behavioral conditions, such as generalized anxiety disorders, phobias, and separation anxiety. Genetic and environmental factors contributing to personality and anxiety are largely unknown. We collected questionnaire data from a Finnish family dog population (N = 3264) in order to study the associating environmental factors for canine fearfulness, noise sensitivity, and separation anxiety. Early life experiences and exercise were found to associate with anxiety prevalence. We found that fearful dogs had less socialization experiences (p = 0.002) and lower quality of maternal care (p daily exercise; dogs with noise sensitivity and separation anxiety had less daily exercise. Our findings suggest that dogs share many of the same environmental factors that contribute to anxiety in other species as well, such as humans and rodents. Our study highlights the importance of early life experiences, especially the quality of maternal care and daily exercise for the welfare and management of the dogs, and reveals important confounding factors to be considered in the genetic characterization of canine anxiety.

  7. An Experiment on the Impact of Communication Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    International Nuclear Information System (INIS)

    Kang, Seongkeun; Lee, Chanyoung; Seong, Poong Hyun; Ha, Jun Su

    2015-01-01

    Korean government won a contract of nuclear power plants to UAE government in 2010 and nuclear power plants are now under construction in Barakah, UAE. However, with technology transfer and international cooperation, there needs to consider several potential problems due to the differences between two culture of the countries such as language, technical culture and expectation. It is unknown how potential problems can lead to an unsafe plant operation as well. We got to know language problem is the main issue from analyzing the OERs. Korean nuclear power plant operators will work in UAE and they will operate the NPPs with other countries' operators and managers. Therefore they will have to use English when they communicate each other. The purpose of this paper is to confirm how much operators get stress and how much accuracy is declined when operators communicate together in English. Reducing human error is quite important to make nuclear power plants safety. As mental workload of human operator is increased, operators get more stress, then the probability of occurring human error may be increased. It will affect bad influence to nuclear power plants safety. There are many factors to make mental workload increased. We focused on communication problem which is a key factor of the increasing mental workload because many Korean operators will work in UAE nuclear power plants and they may work together with UAE operators. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To find the impact of how much English affects the operators' workload, we did two cases of experiments; one is experiment for diagnosis and the other is experiment for execution

  8. An Experiment on the Impact of Communication Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Seongkeun; Lee, Chanyoung; Seong, Poong Hyun [KAIST, Daejeon (Korea, Republic of); Ha, Jun Su [KUSTAR, Abu Dhabi (United Arab Emirates)

    2015-10-15

    Korean government won a contract of nuclear power plants to UAE government in 2010 and nuclear power plants are now under construction in Barakah, UAE. However, with technology transfer and international cooperation, there needs to consider several potential problems due to the differences between two culture of the countries such as language, technical culture and expectation. It is unknown how potential problems can lead to an unsafe plant operation as well. We got to know language problem is the main issue from analyzing the OERs. Korean nuclear power plant operators will work in UAE and they will operate the NPPs with other countries' operators and managers. Therefore they will have to use English when they communicate each other. The purpose of this paper is to confirm how much operators get stress and how much accuracy is declined when operators communicate together in English. Reducing human error is quite important to make nuclear power plants safety. As mental workload of human operator is increased, operators get more stress, then the probability of occurring human error may be increased. It will affect bad influence to nuclear power plants safety. There are many factors to make mental workload increased. We focused on communication problem which is a key factor of the increasing mental workload because many Korean operators will work in UAE nuclear power plants and they may work together with UAE operators. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To find the impact of how much English affects the operators' workload, we did two cases of experiments; one is experiment for diagnosis and the other is experiment for execution.

  9. Operating results and experience and operating regimes in changing demands of energy world

    International Nuclear Information System (INIS)

    Hobza, L.

    2004-01-01

    In this paper, there are stated some operating results and experience obtained from trial operation of Temelin NPP. In Europe, Temelin NPP is presently one of the latest implemented projects of the series of VVER 1000 nuclear units with proven V-320 pressurized water reactor. The distinction between Temelin NPP and original project lays mainly in supply of nuclear fuel and in I and C systems delivered by Westinghouse Company. Temelin NPP has passed through commissioning period and trial operation. The main goal of the trial operation was to meet the requirements of section 2, par. 4, point b) of Decree No. 106/98 Sb. and verification of project parameters and stability of operation, and the situation leading to violation of safety functions fulfilment according to Pre-operational Safety Report should not occur. The integral part of trial operation assessment was also successful performing of determined monitoring programmes, first refuelling and performing of prescribed tests and operational inspections. Simultaneously, first experience was obtained with nuclear fuel; providing of ancillary services; reliability of important components; operation of turbine-generator 1000 MW; chemical regime; influence to environment; and quality of contractors. As safety is the most important indicator, it can be stated that: no facts which would lead to decreasing of safety systems operability have been detected; no facts which would lead to negative affecting of barriers against fading the radioactivity into both working areas and environment, have been detected; good condition of fire safety has been continuously documented; requirements of limits for releasing waste water into environment have been continuously complied with; requirements of limits for releasing radioactive substances (in gaseous and/or liquid state) into environment have been continuously complied with. From the operation regimes point of view is clear, that it would be suitable for the power plant if the

  10. Design improvements, construction and operating experience with BWRs in Japan

    International Nuclear Information System (INIS)

    Uchigasaki, G.; Yokomi, M.; Sasaki, M.; Aoki, R.; Hashimoto, H.

    1983-01-01

    (1) The first domestic-made 1100-MW(e) BWR in Japan commenced commercial operation in April 1982. The unit is the leading one of the subsequent three in Fukushima Daini nuclear power station owned by the Tokyo Electric Power Company Inc. (Tepco). Based on the accumulated construction and operation experience of 500-MW(e) and 800-MW(e) class BWRs, improvements in various aspects during both the design and construction stages were introduced in core and fuel design with advanced gadolinia distribution, reactor feedwater treatment technology for crud reduction, a radwaste island, control and instrumentation to cope with the lessons learned through Three Mile Island assessment etc. (2) Based on many operating experiences with BWRs, an improved BWR core, which has easier operability and higher load factor than the conventional core, has been developed. The characteristic of the improved core is ''axially two-zoned uranium enrichment distribution''; the enrichment of the upper part of the fuel is slightly higher than that of the lower part. Through the improved core it became possible to optimize the axial power flattening and core reactivity control separately by axial enrichment distribution and burnable poison content. The improved fuels were loaded into operating BWRs and successfully proved the performance by this experience. (3) To shorten annual outage time, to reduce radiation exposure, to save manpower, and to achieve high reliability and safety of inspection operation, the remote automatic service and inspection equipment were developed in Japan. This paper presents the concept, distinctive features, and actual operation experience of the automatic refuelling machine, control-rod drive (CRD) remote-handling machine, improved main steam line isolation plug, and the automated ultrasonic inspection system with a computerized data processing unit, which have been developed by Hitachi, Ltd. with excellent results. (author)

  11. Operational experience of decommissioning techniques for research reactors in the United Kingdom

    International Nuclear Information System (INIS)

    England, M.R.; McCool, T.M.

    2002-01-01

    In previous co-ordinated research projects (CRP) conducted by the IAEA no distinction was made between decommissioning activities carried out at nuclear power plants, research reactors or nuclear fuel cycle facilities. As experience was gained and technology advanced it became clear that decommissioning of research reactors had certain specific characteristics which needed a dedicated approach. It was within this context that a CRP on Decommissioning Techniques for Research Reactors was launched and conducted by the IAEA from 1997 to 2001. This paper considers the experience gained from the decommissioning of two research reactors during the course of the CRP namely: (a) the ICI Triga Mk I reactor at Billingham UK which was largely complete by the end of the research project and (b) the Argonaut 100 reactor at the Scottish Universities Research and Reactor centre at East Kilbride in Scotland which is currently is the early stages of dismantling/site operations. It is the intention of this paper with reference to the two case studies outlined above to compare the actual implementation of these works against the original proposals and identify areas that were found to be problematical and/or identify any lessons learnt. (author)

  12. The continuation training of operators and feedback of operational experience in the Royal Navy's nuclear submarine programme

    International Nuclear Information System (INIS)

    Manson, R.P.

    1983-01-01

    Naval continuation training has relied heavily on the use of realistic simulators for over ten years, and this has been proved to be a cost-effective and efficient method of training. The type of simulator used, the selection and qualification of simulator instructors, and the method of training experienced operators is described. Also, the assessment of operator performance, the use of simulators during the final stages of operator qualification, and their use for training operators on plant operation whilst shut-down are covered. The Navy also pays great attention to the feedback of operating experience from sea into both continuation and basic training. This is accomplished using Incident Reports, which are rendered whenever the plant is operated outside the approved Operating Documentation, or when any other unusual circumstance arises. Each Report is individually assessed and replied to by a qualified operator, and those incidents of more general interest are published in a wider circulation document available to all plant operators. In addition, each crew is given an annual lecture on recent operating experiences. Important lessons are fed forward into new plant design, and the incident reports are also used as a source of information for plant reliability data. (author)

  13. Enhancing Research and Practice in Early Childhood through Formative and Design Experiments

    Science.gov (United States)

    Bradley, Barbara A.; Reinking, David

    2011-01-01

    This article describes formative and design experiments and how they can advance research and instructional practices in early childhood education. We argue that this relatively new approach to education research closes the gap between research and practice, and it addresses limitations that have been identified in early childhood research. We…

  14. ATLAS Pixel Detector Operational Experience

    CERN Document Server

    Di Girolamo, B; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 96.9% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  15. Mothers' experience of caring for a child with early onset scoliosis: A qualitative descriptive study.

    Science.gov (United States)

    Lauder, Bonnie; Sinclair, Peter M; Maguire, Jane

    2018-04-01

    This study aimed to identify and describe the experience of parents of children diagnosed with early onset scoliosis living in Australia. Chronic childhood disease has a major impact on health-related quality of life. Caring for a child with a chronic illness is well documented but the specific experiences of parents who care for children with early onset scoliosis, a rare but devastating illness, has not been explored. Numerous studies have described the interrelated psychological, financial, social, physical and logistical factors that impact the experience of the caregiver role with various diseases, but in the case of early onset scoliosis, limited studies have been conducted about the parental experience. A qualitative descriptive design was used. A snowball sampling technique assisted in the recruitment. Parents invited to the study included mothers, fathers and guardians. Data were collected through semistructured interviews and transcribed verbatim. Transcripts were analysed thematically. Data collection complied with the Consolidated criteria for reporting qualitative research guidelines. Twelve mothers of children with early onset scoliosis were interviewed, as only mothers consented to participate. Four major themes emerged: emotional rollercoaster ride, a lack of resources, money talks and pervasive burden. Factors that impacted on the participants' ability to confront, manage and endure caring for a child with early onset scoliosis emerged from the data. The findings suggest there are multiple factors that influence the experience of mothers' caring for a child with early onset scoliosis. The recognition and appropriate management of these factors by healthcare professionals have the potential to improve the quality of life of parents who care for a child with early onset scoliosis. Healthcare professionals have first-line contact with parents of children with early onset scoliosis and are well placed to provide parents with evidence-based education

  16. Simulator experiments on operator reliability and training effectiveness

    International Nuclear Information System (INIS)

    Singh, A. Spurgin, A.J.

    1990-01-01

    This paper discusses some aspects of the Operator Reliability Experiments project sponsored by Electric Power Research Institute. The paper deals with modifications to the HCR correlation which have resulted from the study of operators in responding to nuclear accident scenarios using emergency procedures. The interpretation of time response data and how insights in crew performance can lead to improvements in not only crew performance but also in training effectiveness are discussed

  17. Industry use of operating experience to achieve improved nuclear plant safety

    International Nuclear Information System (INIS)

    Zebroski, E.L.

    1981-01-01

    A principal lesson drawn from the accident at Three Mile Island was the need for a comprehensive and rigorous system for analysis and feedback of operating experience to reactor operators. Chief executives of US utilities directed in mid-1979 that an intensive and rigorous system of analysis and feedback of operating experience be established. This system is commonly referred to as the ''Significant Events Program''. Since April 1980, the Nuclear Safety Analysis Center (NSAC) has been joined by the Institute for Nuclear Power Operations (INPO) in the field investigation of significant operating events. NSAC has responsibility for analysis of the design and physical events aspects, while INPO has primary responsibility for the operators' aspects, including procedures and training. The process of screening, analysis and feedback of operating experience is now functioning as a seven-step process. A variety of data sources is used, including License Event Reports and outage and major maintenance reports. These are compiled and indexed in convenient form. However, such data bases are used only as incidental tools for the basic investigations and analytical efforts. Rapid dissemination of results is provided by a computer-aided conferencing system, which links 70 operating LWR reactors in the USA, and which has now been extended to four utilities outside the USA, representing several dozen more reactors. Major safety and economic incentives are evident for the rigorous use of such operating experience and for participation in a comprehensive system. Traditional habits of secrecy are recognized as obstacles to timely communication. A principal responsibility of top management of reactor-operating organizations is to overcome such habits where they are counter to the public interest, as well as to the health and survival interest of the utility itself

  18. Operational Regimes of the National Spherical Torus Experiment; TOPICAL

    International Nuclear Information System (INIS)

    D. Mueller; M.G. Bell; R.E. Bell; M. Bitter; T. Bigelow; P. Bonoli; M. Carter; J. Ferron; E. Fredrickson; D. Gates; L. Grisham; J.C. Hosea; D. Johnson; R. Kaita; S.M. Kaye; H. Kugel; B.P. LeBlanc; R. Maingi; R. Majeski; R. Maqueda; J. Menard; M. Ono; F. Paoletti; S. Paul; C.K. Phillips; R. Pinsker; R. Raman; S.A. Sabbagh; C.H. Skinner; V.A. Soukhanovskii; D. Stutman; D. Swain; Y. Takase; J. Wilgen; J.R. Wilson; G.A. Wurden; S. Zweben

    2002-01-01

    The National Spherical Torus Experiment (NSTX) is a proof-of-principle experiment designed to study the physics of Spherical Tori (ST), i.e., low-aspect-ratio toroidal plasmas. Important issues for ST research are whether the high-eta stability and reduced transport theoretically predicted for this configuration can be realized experimentally. In NSTX, the commissioning of a digital real-time plasma control system, the provision of flexible heating systems, and the application of wall conditioning techniques were instrumental in achieving routine operation with good confinement. NSTX has produced plasmas with R/a(approx) 0.85 m/0.68 m, A(approx) 1.25, Ip* 1.1 MA, BT= 0.3-0.45 T, k* 2.2, d* 0.5, with auxiliary heating by up to 4 MW of High Harmonic Fast Waves, and 5 MW of 80 keV D0 Neutral Beam Injection (NBI). The energy confinement time in plasmas heated by NBI has exceeded 100 ms and a toroidal beta (bT= 2m0 and lt;p and gt;/BT02, where BT0 is the central vacuum toroidal magnetic field) up to 22% has be en achieved. HHFW power of 2.3 MW has increased the electron temperature from an initial 0.4 keV to 0.9 keV both with and without producing a significant density rise in the plasma. The early application of both NBI and HHFW heating has slowed the penetration of the inductively produced plasma current, modifying the current profile and, thereby, the observed MHD stability

  19. Operational limits on WEST inertial divertor sector during the early phase experiment

    Science.gov (United States)

    Firdaouss, M.; Corre, Y.; Languille, P.; Greuner, H.; Autissier, E.; Desgranges, C.; Guilhem, D.; Gunn, J. P.; Lipa, M.; Missirlian, M.; Pascal, J.-Y.; Pocheau, C.; Richou, M.; Tsitrone, E.

    2016-02-01

    The primary goal of the WEST project is to be a test bed to characterize the fatigue and lifetime of ITER-like W divertor components subjected to relevant thermal loads. During the first phase of exploitation (S2 2016), these components (W monoblock plasma facing unit—W-PFU) will be installed in conjunction with graphite components (G-PFU). Since the G-PFU will not be actively cooled, it is necessary to ensure the expected pulse duration allows the W-PFU to reach its steady state without overheating the G-PFU assembly structure or the embedded stainless-steel diagnostics. High heat flux tests were performed at the GLADIS facility to assess the thermal behavior of the G-PFU. Some operational limits based on plasma parameters were determined. It was found that it is possible to operate at an injected power such that the maximal incident heat flux on the lower divertor is 10 MW m-2 for the required pulse length.

  20. Operational limits on WEST inertial divertor sector during the early phase experiment

    International Nuclear Information System (INIS)

    Firdaouss, M; Corre, Y; Languille, P; Autissier, E; Desgranges, C; Guilhem, D; Gunn, J P; Lipa, M; Missirlian, M; Pascal, J-Y; Pocheau, C; Richou, M; Tsitrone, E; Greuner, H

    2016-01-01

    The primary goal of the WEST project is to be a test bed to characterize the fatigue and lifetime of ITER-like W divertor components subjected to relevant thermal loads. During the first phase of exploitation (S2 2016), these components (W monoblock plasma facing unit—W-PFU) will be installed in conjunction with graphite components (G-PFU). Since the G-PFU will not be actively cooled, it is necessary to ensure the expected pulse duration allows the W-PFU to reach its steady state without overheating the G-PFU assembly structure or the embedded stainless-steel diagnostics. High heat flux tests were performed at the GLADIS facility to assess the thermal behavior of the G-PFU. Some operational limits based on plasma parameters were determined. It was found that it is possible to operate at an injected power such that the maximal incident heat flux on the lower divertor is 10 MW m −2 for the required pulse length. (paper)

  1. Small sodium valve design and operating experience

    International Nuclear Information System (INIS)

    McGough, C.B.

    1974-01-01

    The United States Liquid Metal Fast Breeder Reactor program (LMFBR) includes an extensive program devoted to the development of small sodium valves. This program is now focused on the development and production of valves for the Fast Flux Test Facility (FFTF) now under construction near Richland, Washington. Other AEC support facilities, such as various test loops located at the Liquid Metal Engineering Center (LMEC), Los Angeles, California, and at the Hanford Engineering Development Laboratory (HEDL), Richland, Washington, also have significant requirements for small sodium valves, and valves similar in design to the FFTF valves are being supplied to these AEC laboratories for use in their critical test installations. A principal motivation for these valve programs, beyond the immediate need to provide high-reliability valves for FFTF and the support facilities, is the necessity to develop small valve technology for the Clinch River Breeder Reactor Plant (CRBRP). FFTF small sodium valve design and development experience will be directly applied to the CRBRP program. Various test programs have been, and are being, conducted to verify the performance and integrity of the FFTF valves, and to uncover any potential problems so that they can be corrected before the valves are placed in service in FFTF. The principal small sodium valve designs being utilized in current U.S. programs, the test and operational experience obtained to date on them, problems uncovered, and future development and testing efforts being planned are reviewed. The standards and requirements to which the valves are being designed and fabricated, the valve designs in current use, valve operators, test and operating experience, and future valve development plans are summarized. (U.S.)

  2. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S [ed.

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  3. Operating Experience at the Aagesta Nuclear Power Station

    International Nuclear Information System (INIS)

    Sandstroem, S.

    1966-09-01

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW t ) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965

  4. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S. (ed.)

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  5. Recent operating experience and improvement of commercial IGCC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-01

    IGCC has today reached a status where experience is available from first and second generation plants, built in the 1970s/1980s and in the 1990s respectively, as commercial-scale demonstration plants for coal-based applications. These plants feature variations on gasification technology and subsequent environmental controls and in operating them a number of technical and commercial lessons have been learned that will help to improve the next generation of IGCC projects. The report reviews and summarises the state-of-the-art and operating experience of several commercial IGCC plants worldwide, setting out the lessons learned and plans for future development embracing such issues as the changes or modifications to plant made to overcome the operational problems and to improve the reliability and availability of the plant. Since IGCC is considered a 'capture ready' technology for CO2 abatement, the current status with regard to the incorporation of carbon capture and storage systems (CCS) has been reviewed. Finally, the report outlines the issues associated with assessing the risks in commercialising IGCC plant.

  6. Early Life Experience and Gut Microbiome: The Brain-Gut-Microbiota Signaling System.

    Science.gov (United States)

    Cong, Xiaomei; Henderson, Wendy A; Graf, Joerg; McGrath, Jacqueline M

    2015-10-01

    Over the past decades, advances in neonatal care have led to substantial increases in survival among preterm infants. With these gains, recent concerns have focused on increases in neurodevelopment morbidity related to the interplay between stressful early life experiences and the immature neuroimmune systems. This interplay between these complex mechanisms is often described as the brain-gut signaling system. The role of the gut microbiome and the brain-gut signaling system have been found to be remarkably related to both short- and long-term stress and health. Recent evidence supports that microbial species, ligands, and/or products within the developing intestine play a key role in early programming of the central nervous system and regulation of the intestinal innate immunity. The purpose of this state-of-the-science review is to explore the supporting evidence demonstrating the importance of the brain-gut-microbiota axis in regulation of early life experience. We also discuss the role of gut microbiome in modulating stress and pain responses in high-risk infants. A conceptual framework has been developed to illustrate the regulation mechanisms involved in early life experience. The science in this area is just beginning to be uncovered; having a fundamental understanding of these relationships will be important as new discoveries continue to change our thinking, leading potentially to changes in practice and targeted interventions.

  7. Effects of Early Musical Experience on Auditory Sequence Memory

    Directory of Open Access Journals (Sweden)

    Adam T. Tierney

    2008-12-01

    Full Text Available The present study investigated a possible link between musical training and immediate memory span by testing experienced musicians and three groups of musically inexperienced subjects (gymnasts, Psychology 101 students, and video game players on sequence memory and word familiarity tasks. By including skilled gymnasts who began studying their craft by age six, video game players, and Psychology 101 students as comparison groups, we attempted to control for some of the ways skilled musicians may differ from participants drawn from the general population in terms of gross motor skills and intensive experience in a highly skilled domain from an early age. We found that musicians displayed longer immediate memory spans than the comparison groups on auditory presentation conditions of the sequence reproductive span task. No differences were observed between the four groups on the visual conditions of the sequence memory task. These results provide additional converging support to recent findings showing that early musical experience and activity-dependent learning may selectively affect verbal rehearsal processes and the allocation of attention in sequence memory tasks.

  8. European clearinghouse on nuclear power plants operational experience feedback

    International Nuclear Information System (INIS)

    Ranguelova, Vesselina; Bruynooghe, Christiane; Noel, Marc

    2010-01-01

    Learning from operational experience and applying this knowledge promptly and intelligently is one of the ways to improve the safety of Nuclear Power Plant (NPP). Recent reviews of the effectiveness of Operational Experience Feedback (OEF) systems have pointed to the need for further improvement, with importance being placed on tailoring the information to the needs of the regulators. In 2007, at the request of a number of nuclear safety regulatory authorities in Europe, the Institute for Energy of the European Commission's Joint Research Centre (EC JRC) initiated a project on Nuclear Power Plant operational experience feedback, which adopts an integrated approach to the research needed to strengthen the European capabilities for assessment of NPP operational events and to promote the development of tools and mechanisms for the improved application of the lessons learned. Consequently, a so-called ''European Clearinghouse'' on NPP OEF was established, which includes scientific officers from the EC JRC, a number of European nuclear safety regulatory authorities and some of their Technical Support Organizations (TSOs). The paper discusses the activities implemented in 2008 within the framework of the European Clearinghouse on NPP OEF (hereinafter called the European NPP Clearinghouse) and provides an overview of the main conclusions drawn from the safety studies performed. Outlook of the activities carried out in 2009 are given. (orig.)

  9. Manual for IRS Coding. Joint IAEA/NEA International Reporting System for Operating Experience

    International Nuclear Information System (INIS)

    2011-01-01

    The International Reporting System for Operating Experience (IRS) is jointly operated by the International Atomic Energy Agency (IAEA) and the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development (OECD/NEA). In early 2010, the IAEA and OECD/NEA jointly issued the IRS Guidelines, which described the reporting system and process and gave users the necessary elements to enable them to produce IRS reports to a high standard of quality while retaining the effectiveness of the system expected by all Member States operating nuclear power plants. The purpose of the present Manual for IRS Coding is to provide supplementary guidance specifically on the coding element of IRS reports to ensure uniform coding of events that are reported through IRS. This Coding Manual does not supersede the IRS Guidelines, but rather, supports users and preparers in achieving a consistent and high level of quality in their IRS reports. Consistency and high quality in the IRS reports allow stakeholders to search and retrieve specific event information with ease. In addition, well-structured reports also enhance the efficient management of the IRS database. This Coding Manual will give specific guidance on the application of each section of the IRS codes, with examples where necessary, of when and how these codes are to be applied. As this reporting system is owned by the Member States, this manual has been developed and approved by the IRS National Coordinators with the assistance of the IAEA and NEA secretariats

  10. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  11. International Co-Operation in Control Engineering Education Using Online Experiments

    Science.gov (United States)

    Henry, Jim; Schaedel, Herbert M.

    2005-01-01

    This paper describes the international co-operation experience in teaching control engineering with laboratories being conducted remotely by students via the Internet. This paper describes how the students ran the experiments and their personal experiences with the laboratory. A tool for process identification and controller tuning based on…

  12. The Pajarito Site operating procedures for the Los Alamos Critical Experiments Facility

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1991-12-01

    Operating procedures consistent with DOE Order 5480.6, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Los Alamos Critical Experiments Facility (LACEF) of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1983 and apply to any criticality experiment performed at the facility. 11 refs

  13. Technical report on operating experience with boiling water reactor offgas systems

    International Nuclear Information System (INIS)

    Lo, R.; Barrett, L.; Grimes, B.; Eisenhut, D.

    1978-03-01

    Over 100 reactor years of Boiling Water Reactor (BWR) operating experience have been accumulated since the first commercial operation of BWRs. A number of incidents have occurred involving the ''offgas'' of these Boiling Water Reactors. This report describes the generation and processing of ''offgas'' in Boiling Water Reactors, the safety considerations regarding systems processing the ''offgas'', operating experience involving ignitions or explosions of ''offgas'' and possible measures to reduce the likelihood of future ignitions or explosions and to mitigate the consequences of such incidents should they occur

  14. Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade

    International Nuclear Information System (INIS)

    Thomas Powers; Davis, G.; Michael Drury; Christiana Grenoble; Hovater, J.; Lawrence King; Tomasz Plawski; Joseph Preble

    2005-01-01

    Three cryomodules have been designed and built as intermediate prototypes for the CEBAF 12 GeV upgrade. This paper will discuss the commissioning and operational experience with the second of these cryomodules, which was installed and commissioned in the Jefferson Lab 10 kW Free Electron Laser Facility. Within the cryomodule are eight 7-cell, 1497 MHz cavities. It was designed to accelerate 1 mA of beam in excess of 70 MV and to have the same footprint as a standard CEBAF cryomodule. The cryomodule was installed in parallel with the FEL beam line in the spring of 2004 and characterized simultaneous with beam delivery. It was installed in the beam line in the early summer of 2004 and has since been operated as part of an energy recovered linac with 5 mA of beam current and 75 MV accelerating gradient for extended periods of time. Additionally, it was operated at 1 mA of beam current and 80 MV of accelerating gradient for several hours without a trip. In the latter operating mode the beam current was limited by the injector setup

  15. A SVDD and K-Means Based Early Warning Method for Dual-Rotor Equipment under Time-Varying Operating Conditions

    Directory of Open Access Journals (Sweden)

    Zhinong Jiang

    2018-01-01

    Full Text Available Under frequently time-varying operating conditions, equipment with dual rotors like gas turbines is influenced by two rotors with different rotating speeds. Alarm methods of fixed threshold are unable to consider the influences of time-varying operating conditions. Hence, those methods are not suitable for monitoring dual-rotor equipment. An early warning method for dual-rotor equipment under time-varying operating conditions is proposed in this paper. The influences of time-varying rotating speeds of dual rotors on alarm thresholds have been considered. Firstly, the operating conditions are divided into several limited intervals according to rotating speeds of dual rotors. Secondly, the train data within each interval is processed by SVDD and the allowable ranges (i.e., the alarm threshold of the vibration are determined. The alarm threshold of each interval of operating conditions is obtained. The alarm threshold can be expressed as a sphere, whose controlling parameters are the coordinate of the center and the radius. Then, the cluster center of the test data, whose alarm state is to be judged, can be extracted through K-means. Finally, the alarm state can be obtained by comparing the cluster center with the corresponding sphere. Experiments are conducted to validate the proposed method.

  16. A Comparison of Premenarcheal Expectations and Postmenarcheal Experiences in Chinese Early Adolescents

    Science.gov (United States)

    Tang, Catherine So-Kum; Yeung, Dannii Y. L.; Lee, Antoinette Marie

    2004-01-01

    The present study examined Chinese early adolescents' expectations and experiences of their first menstruation. It included 952 participants, 476 premenarcheal and 476 postmenarcheal girls matched by age and by grade level. Results showed that compared to experiences of postmenarcheal girls, premenarcheal girls anticipated more negative emotional…

  17. Federal Financial Incentives to Induce Early Experience Producing Unconventional Liquid Fuels

    National Research Council Canada - National Science Library

    Camm, Frank; Bartis, James T; Bushman, Charles J

    2008-01-01

    This technical report explains an analytic way to design and assess packages of financial incentives that the government can use to cost effectively promote early experience with coal-to-liquids (CTL...

  18. U.S. Nuclear Power Plant Operating Cost and Experience Summaries

    International Nuclear Information System (INIS)

    Reid, RL

    2003-01-01

    The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports

  19. Development of new HRA methods based upon operational experience

    International Nuclear Information System (INIS)

    Cooper, S.E.; Luckas, W.J.; Barriere, M.T.; Wreathall, J.

    2004-01-01

    Under the auspices of the US Nuclear Regulatory Commission (NRC), previously unaddressed human reliability issues are being investigated in order to support the development of human reliability analysis (HRA) methods for both low power and shutdown (LP and S) and full-power conditions. Actual operational experience, such as that reported in Licensee Event Reports (LERs), have been used to gain insights and provide a basis for the requirements of new HRA methods. In particular, operational experience has shown that new HRA methods for LP and S must address human-induced initiators, errors of commission, mistakes (vs. slips), dependencies, and the effects of multiple performance shaping factors (PSFs). (author)

  20. Ageing degradation mechanisms in nuclear power plants: lessons learned from operating experience

    International Nuclear Information System (INIS)

    Bieth, M.; Zerger, B.; Duchac, A.

    2014-01-01

    This paper presents main results of a comprehensive study performed by the European Clearinghouse on Operating Experience Feedback of Nuclear Power Plants (NPP) with the support of IRSN (Institut de Surete Nucleaire et de Radioprotection) and GRS (Gesellschaft fuer Anlagen und Reaktorsicherheit mbH). Physical ageing mechanisms of Structures, Systems and Components (SSC) that eventually lead to ageing related systems and components failures at nuclear power plants were the main focus of this study. The analysis of ageing related events involved operating experience reported by NPP operators in France, Germany, USA and to the IAEA/NEA International Reporting System on operating experience for the past 20 years. A list of relevant ageing related events was populated. Each ageing related event contained in the list was analyzed and results of analysis were summarized for each ageing degradation mechanism which appeared to be the dominant contributor or direct cause. This paper provides insights into ageing related operating experience as well as recommendations to deal with the physical ageing of nuclear power plant SSC important to safety. (authors)

  1. Estimation of fire frequency from PWR operating experience

    International Nuclear Information System (INIS)

    Bertrand, R.; Bonneval, F.; Barrachin, G.; Bonino, F.

    1998-01-01

    In the framework of a fire probabilistic safety assessment (Fire PSA), the French Institute for Nuclear Safety and Protection (IPSN) has developed a method for estimating the frequency of fire in a nuclear power plant room. This method is based on the analysis of French Pressurized Water Reactors operating experience. The method adopted consists is carrying out an in-depth analysis of fire-related incidents. A database has been created including 202 fire events reported in 900 MWe and 1300 MWe reactors from the start of their commercial operation up to the first of March 1994, which represents a cumulated service life of 508 reactor-years. For each reported fire, several data were recorded among which: The operating state of the reactor in the stage preceding the fire, the building in which the fire broke out, the piece of equipment or the human intervention which caused the fire. Operating experience shows that most fires are initiated by electrical problems (short-circuits, arcing, faulty contacts, etc.) and that human intervention also plays an important role (grinding, cutting, welding, cleaning, etc.). A list of equipment and of human interventions which proved to be possible fire sources was therefore drawn up. the items of this list were distributed in 19 reference groups defined by taking into account the nature of the potential ignition source (transformers, electrical cabinets, pumps, fans, etc.). The fire frequency assigned to each reference group was figured out using the operating experience information of the database. The fire frequency in a room is considered to be made out of two contributions: one due to equipment which is proportional to the number of pieces of equipment from each reference group contained in the room, and a second one which is due to human interventions and assumed to be uniform throughout the reactor. Formulas to assess the fire frequencies in a room, the reactor being in a shutdown state or at power, are then proposed

  2. [Surgical treatment for incisions fat colliquation or infections at early stage after operation of lumbar disc herniation].

    Science.gov (United States)

    Guan, Ting-Jin; Zheng, Liang-Guo; Sun, Peng; Li, Xing-Xue

    2014-05-01

    To explore the reason, key diagnosic point and therapeutic method of the incisions fat colliquation or infections at early stage after operation of lumbar disc herniation. From July 2007 to May 2012, clinical data of 11 patients with incision fat liquefaction or early infection after lumbar discectomy were retrospectively analyzed. There were 5 males and 6 females with an average age of 43.1 years, and the mean time of incisions fat colliquation or infection was 5 days and a half after operation. The main clinical features included local wound pain aggravating, fervescence, fresh seepage in the wound, and blood inflammatory index increased, etc. The wound could heal at the first treatment stage or not was an evaluation standard of curative effect. All patients were followed up with an average period of 21 months. The wounds of 10 cases healed at the first stage without recurrence and complications. In 1 case infected by staphylococcus aureus, distal part of the wound present local red, swelling and with wave motion at 2 months after operation, staphylococcus aureus infection was confirmed after puncture and bacterial culture, and 1 thrum was found after local incision. The wound healed after change dressings for 1 week, without recurrence after followed up for 13 months. Preventing the risk factors before operation, minimizing invasive technique during operation reasonable antibiotics application for the lumbar operation reguiring placement objects, and correctly handling with wound after operation could prevent and reduce the incidence of incisions fat liquefaction or infection after operation of lumbar disc herniation. For incision fat liquefaction or infection, early diagnosis, debridement, VSD negative pressure irrigation and drainage, to choosing sensitive antibiotics according to the results of drug sensitivity, may contribute to wound early healing and decrease complication.

  3. The Organisation for Economic Co-Operation and Development's International Early Learning Study: What Happened Next

    Science.gov (United States)

    Moss, Peter; Urban, Mathias

    2017-01-01

    In this article, the authors provide an update on what has happened over recent months with the Organisation for Economic Co-operation and Development's proposal for an International Early Learning Study, and review responses to the proposed International Early Learning Study, including the concerns that have been raised about this new venture in…

  4. Precision operation of the Nova laser for fusion experiments

    International Nuclear Information System (INIS)

    Caird, J.A.; Ehrlich, R.B.; Hermes, G.L.; Landen, O.L.; Laumann, C.W.; Lerche, R.A.; Miller, J.L.; Murray, J.E.; Nielsen, N.D.; Powell, H.T.; Rushford, M.C.; Saunders, R.L.; Thompson, C.E.; VanArsdall, P.J.; Vann, C.S.; Weiland, T.L.

    1994-01-01

    The operation of a Neodymium glass laser of a special design for fusion experiments is improved by a better pulse synchronization, the gain stabilization, and the laser diagnostics. We used sensor upgrading and antifriction coating of focusing lenses. The pointing accuracy of the Nova laser meets now our goal for precision operation. (AIP) copyright 1994 American Institute of Physics

  5. Operating experience of steam generator test facility

    International Nuclear Information System (INIS)

    Sureshkumar, V.A.; Madhusoodhanan, G.; Noushad, I.B.; Ellappan, T.R.; Nashine, B.K.; Sylvia, J.I.; Rajan, K.K.; Kalyanasundaram, P.; Vaidyanathan, G.

    2006-01-01

    Steam Generator (SG) is the vital component of a Fast Reactor. It houses both water at high pressure and sodium at low pressure separated by a tube wall. Any damage to this barrier initiates sodium water reaction that could badly affect the plant availability. Steam Generator Test Facility (SGTF) has been set up in Indira Gandhi Centre for Atomic Research (IGCAR) to test sodium heated once through steam generator of 19 tubes similar to the PFBR SG dimension and operating conditions. The facility is also planned as a test bed to assess improved designs of the auxiliary equipments used in Fast Breeder Reactors (FBR). The maximum power of the facility is 5.7 MWt. This rating is arrived at based on techno economic consideration. This paper covers the performance of various equipments in the system such as Electro magnetic pumps, Centrifugal sodium pump, in-sodium hydrogen meters, immersion heaters, and instrumentation and control systems. Experience in the system operation, minor modifications, overall safety performance, and highlights of the experiments carried out etc. are also brought out. (author)

  6. Operational experience of a large area x-ray camera for protein crystallography

    International Nuclear Information System (INIS)

    Joachimiak, A.; Jorden, A. R.; Loeffen, P. W.; Naday, I.; Sanishvili, R.; Westbrook, E. M.

    1999-01-01

    After 3 years experience of operating very large area (210mm x 210mm) CCD-based detectors at the Advanced Photon Source, operational experience is reported. Four such detectors have been built, two for Structural Biology Center (APS-1 and SBC-2), one for Basic Energy Sciences Synchrotrons Radiation Center (Gold-2) at Argonne National Laboratory's Advanced Photon Source and one for Osaka University by Oxford Instruments, for use at Spring 8 (PX-21O). The detector is specifically designed as a high resolution and fast readout camera for macromolecular crystallography. Design trade-offs for speed and size are reviewed in light of operational experience and future requirements are considered. Operational data and examples of crystallography data are presented, together with plans for more development

  7. Federal Financial Incentives to Induce Early Experience Producing Unconventional Liquid Fuels

    National Research Council Canada - National Science Library

    Camm, Frank; Bartis, James T; Bushman, Charles J

    2008-01-01

    ... that is likely to ensure that early CTL production experience occurs cost effectively. Such a relationship yields investor and government behavior that, in turn, generates a set of cash flows to and from...

  8. The Other Shoe: An Early Operant Conditioning Chamber for Pigeons

    OpenAIRE

    Sakagami, Takayuki; Lattal, Kennon A.

    2016-01-01

    We describe an early operant conditioning chamber fabricated by Harvard University instrument maker Ralph Gerbrands and shipped to Japan in 1952 in response to a request of Professor B. F. Skinner by Japanese psychologists. It is a rare example, perhaps the earliest still physically existing, of such a chamber for use with pigeons. Although the overall structure and many of the components are similar to contemporary pigeon chambers, several differences are noted and contrasted to evolutionary...

  9. Pre-operative and early post-operative factors associated with surgical site infection after laparoscopic sleeve gastrectomy.

    Science.gov (United States)

    Ruiz-Tovar, Jaime; Oller, Inmaculada; Llavero, Carolina; Arroyo, Antonio; Muñoz, Jose Luis; Calero, Alicia; Diez, María; Zubiaga, Lorea; Calpena, Rafael

    2013-08-01

    Surgical procedures on obese patients are expected to have a high incidence of surgical site infection (SSI). The identification of pre-operative or early post-operative risk factors for SSI may help the surgeon to identify subjects in risk and adequately optimize their status. We conducted a study of the association of comorbidities and pre- and post-operative analytical variables with SSI following laparoscopic sleeve gastrectomy for the treatment of morbid obesity. We performed a prospective study of all morbidly obese patients undergoing laparoscopic sleeve gastrectomy as a bariatric procedure between 2007 and 2011. An association of clinical and analytical variables with SSI was investigated. The study included 40 patients with a mean pre-operative body mass index (BMI) of 51.2±7.9 kg/m(2). Surgical site infections appeared in three patients (7.5%), of whom two had an intra-abdominal abscess located in the left hypochondrium and the third had a superficial incisional SSI. Pre-operatively, a BMI >45 kg/m(2) (OR 8.7; p=0.008), restrictive disorders identified by pulmonary function tests (OR 10.0; p=0.012), a serum total protein concentration 30 mcg/dL (OR 13.0; p=0.003), and a mean corpuscular volume (MCV) operative SSI. Post-operatively, a serum glucose >128 mg/dL (OR 4.7; p=0.012) and hemoglobin operative anemia and hyperglycemia as risk factors for SSI. In these situations, the surgeon must be aware of and seek to control these risk factors.

  10. Operational experience at Fort St. Vrain

    International Nuclear Information System (INIS)

    Bramblett, G.C.; Fisher, C.R.; Swart, F.E.

    1981-01-01

    The Fort St. Vrain (FSV) station, a 330-MW(e) single reheat steam cycle powered by a high-temperature gas-cooled reactor (HTGR), is the first HTGR to enter commercial operation. Designed and built by General Atomic Company (GA), the plant is owned and operated by Public Service Company of Colorado (PSC). Many unique design features have been incorporated into this reactor system, including high-pressure helium as the primary system coolant, a graphite-moderated prismatic block core design, fission-product-containing carbide coatings on both fissile and fertile fuel particles, steam-driven helium circulators turning on water bearings, and once-through steam generators. All of these systems are contained in a prestressed concrete reactor vessel (PCRV). Extensive testing has been conducted during the rise to power following first criticality early in 1974 to verify system design performance. During this period, the plant has operated at power levels up to 70% and produced over one billion kilowatt hours of electricity. In 1979, the first refueling was conducted in conjunction with an extensive in-core inspection, the addition of in-core instrumentation, and a planned removal of a circulator for inspection. Later in the year, a scheduled shutdown was undertaken for surveillance tests, insertion of core region constraint devices (RCDs), and other maintenance. Fort St. Vrain has encountered problems of the type that would be expected in a first-of-a-kind system. The plant is currently restricted to 70% of design power by the Nuclear Regulatory Commission (NRC) pending resolution of the core region gas outlet temperature fluctuation problem. Even so, the basic performance of the HTGR concept and all of the unique design features have been successfully demonstrated. The system has been characterized by low personnel radiation exposures, operational flexibility, and long time afforded for status evaluation and response. (author)

  11. Early Experience with the StopLoss Jones Tube.

    Science.gov (United States)

    Bagdonaite, Laura; Pearson, Andrew R

    2015-06-01

    Extrusion is the most common reason for failure after Jones tube placement. The StopLoss Jones tube (SLJT) is a new innovation in Jones tubes that incorporates a flexible silicone internal flange to resist extrusion. We present our early experience of using this new tube and associated introducer system. We retrospectively analysed the case notes of a single surgeon consecutive series of patients having SLJT placement from November 2011 to November 2013. 29 SLJTs were placed in 25 eyes of 19 patients. Tube follow-up ranged from 1-25 months (mean 10 months) with a total of 291 tube-months. The indications for SLJT placement were: previous LJT complications (52%), failed canalicular-DCR surgery (31%), primary placement for inoperable canalicular occlusion (14%) and patent non-functioning DCR (3%). Tube length ranged from 10-16 mm. The tube introducer system was simple and effective and there were no intra-operative complications. The tube extrusion rate was 0%. Complications occurred in 5 tubes: 1 was too long, and 4 others (14%) developed conjunctival overgrowth/medial tube migration. Patient satisfaction with the tube was: 86% fully satisfied, 10% was moderately satisfied, 3% not satisfied. The overall final surgical success rate at last follow-up was 92%. In this short follow-up initial study the SLJT is simple to use and has a high rate of success and patient satisfaction. The addition of the internal silicone flange appears to prevent the previously common problem of extrusion.

  12. Annual meeting on nuclear technology 1980. Technical meeting: Operating experiences

    International Nuclear Information System (INIS)

    1980-01-01

    In addition to general experiences, experiences in reactor operation with relation to the Phenix reactor, KNK-2 reactor, the AVR reactor, the BWR-type KKI-reactor, the Philippsburg-1 reactor and the Obrigheim reactor are described. (DG) [de

  13. Visions of normality? Early experiences of radiographic reporting

    Energy Technology Data Exchange (ETDEWEB)

    Reeves, Pauline E-mail: pauline.reeves@whnt.nhs.uk

    2004-08-01

    This article reflects on my early [student] experiences in learning to undertake radiographic reporting and uses critical incidents to highlight two areas of error during this period. These errors include perceptual (optical illusions and, in particular, the Mach band effect) and lack of subject specific knowledge (specifically anatomical knowledge--especially of normal anatomical variants). These two errors are analysed in the wider context of radiological error and the difficulty in reaching consensus even between experienced reporters.

  14. Visions of normality? Early experiences of radiographic reporting

    International Nuclear Information System (INIS)

    Reeves, Pauline

    2004-01-01

    This article reflects on my early [student] experiences in learning to undertake radiographic reporting and uses critical incidents to highlight two areas of error during this period. These errors include perceptual (optical illusions and, in particular, the Mach band effect) and lack of subject specific knowledge (specifically anatomical knowledge--especially of normal anatomical variants). These two errors are analysed in the wider context of radiological error and the difficulty in reaching consensus even between experienced reporters

  15. Experiences on operation, maintenance and utilization in JRR-2

    International Nuclear Information System (INIS)

    1994-08-01

    The Japan Research Reactor No.2 (JRR-2) is a high performance 10 MW multi purpose research reactor, heavy water moderated and cooled enriched uranium fuel used. Since the first criticality was attained in October, 1960, JRR-2 has been operated to satisfy the utilization demands, such as irradiation of fuel and materials, neutron beam experiments, radio isotope production and B.N.C.T (Boron Neutron Capture Therapy). During the operation, various kinds of troubles mainly caused by the old design concept had been occurred at the JRR-2 systems and components. Those troubles were solved with adequate countermeasures of timely repairs and large scale modifications with newest techniques. The works above were completely carried out by the staff of JRR-2 and related divisions. As a result, JRR-2 became one of the oldest research reactors which are still under operation in the world. Since JRR-2 has been utilized for more than 30 years, the operation mode was changed from 12 days-one cycle to 3 days-one cycle in April, 1994, taking into consideration aging of the reactor systems. In this paper, the experiences of JRR-2 for more than 30 years such as operation, maintenance, repair, modifications and utilization on JRR-2 are described. (author)

  16. Fast reactor operating experience gained in Russia: Analysis of anomalies and abnormal operation cases

    International Nuclear Information System (INIS)

    Ashurko, Y.M.; Baklushin, R.P.; Zagorulko, Y.I.; Ivanenko, V.N.; Matveyev, V.P.; Vasilyev, B.A.

    2000-01-01

    Review of various anomalous events and abnormal operation experience gained in the process of Russian fast reactors operation is given in the paper. The main information refers to the BN-600 demonstration reactor operation. Statistical data on sodium leaks and steam generator failures are presented, and sources of these events and countermeasures taken to avoid their appearance on the operating reactors as well as related changes made in the BN-800 reactor design are considered. In the paper, some features of impurities behaviour are considered in various modes of the BN-600 reactor operation. Information is given on the impurities ingress into the circuits, on abnormal situation emerged in the process of the BN-600 reactor operation and its probable cause. Information is presented on the event related to the increased torque of the BN-600 reactor central rotating column and repair works performed. (author)

  17. Experience from construction and operation of Karachi nuclear power plant

    International Nuclear Information System (INIS)

    Zaidi, S.M.N.

    1977-01-01

    Pakistan's first nuclear power plant (KANUPP) is owned and operated by the Pakistan Atomic Energy Commission (PAEC). It uses a heavy water moderated and cooled natural uranium fuelled reactor. Total installed capacity is 137 MW(e). It was designed, constructed and commissioned by Canadian General Electric Co. Ltd. (CGE) as Prime Contractor. Construction started in mid-1966 and was completed in mid 1970; commissioning started in early 1970 and was completed at the end of 1972. Intensive on-the-job training for 20 engineers and 15 operators was provided by CGE in Canada. Ten engineers also worked in CGE's design offices. With this key group of engineers and technicians PAEC had no difficulty in taking over the plant from CGE after completion. The construction of the plant in a developing country presented special problems to CGE. The relatively small local construction firms had limited experience and equipment. Construction plant, equipment and tools were scarce. Fabrication and workshop facilities of limited scope were available but their quotations were relatively high. A scarcity of engineering, technical and skilled manpower for the construction of the project left as the only alternative on-site training for carefully recruited technicians. The results were most gratifying and compared favourably with CGE's Canadian experience. Welding, pipe fitting, tubing work and electrical connections were excellent. The local staff's productivity and dedication were very good. In the commissioning period, PAEC and CGE engineers and technicians worked as one team, testing and debugging the equipment and systems and demonstrating the contractual performance warranties. This period extended to approximately three years due to many technical problems resulting from equipment failures, environmental problems, system problems, plant loading limitations in view of the relatively small size of the grid system and special requirement of fuel conditioning to avoid premature fuel

  18. Early 13 TeV Results from the ATLAS Experiment

    CERN Multimedia

    CERN. Geneva

    2015-01-01

    The ATLAS experiment has recorded almost 200 pb-1 of collision data at 13 TeV centre-of-mass energy. The seminar presents the status of the data taking, the commissioning of the event reconstruction, focusing on the key techniques that have allowed to quickly reach a good understanding of the basic physics objects, and early physics results.

  19. The Organisation for Economic Co-Operation and Development's International Early Learning Study: Opening for Debate and Contestation

    Science.gov (United States)

    Moss, Peter; Dahlberg, Gunilla; Grieshaber, Susan; Mantovani, Susanna; May, Helen; Pence, Alan; Rayna, Sylvie; Swadener, Beth Blue; Vandenbroeck, Michel

    2016-01-01

    The Organisation for Economic Co-operation and Development is initiating the International Early Learning Study, a cross-national assessment of early learning outcomes involving the testing of 5-year-old children in participating countries. The authors use this colloquium to inform members of the early childhood community about this project and to…

  20. The Drop Tower Bremen -Experiment Operation

    Science.gov (United States)

    Könemann, Thorben; von Kampen, Peter; Rath, Hans J.

    The idea behind the drop tower facility of the Center of Applied Space Technology and Micro-gravity (ZARM) in Bremen is to provide an inimitable technical opportunity of a daily access to short-term weightlessness on earth. In this way ZARM`s european unique ground-based microgravity laboratory displays an excellent economic alternative for research in space-related conditions at low costs comparable to orbital platforms. Many national and international ex-perimentalists motivated by these prospects decide to benefit from the high-quality and easy accessible microgravity environment only provided by the Drop Tower Bremen. Corresponding experiments in reduced gravity could open new perspectives of investigation methods and give scientists an impressive potential for a future technology and multidisciplinary applications on different research fields like Fundamental Physics, Astrophysics, Fluid Dynamics, Combus-tion, Material Science, Chemistry and Biology. Generally, realizing microgravity experiments at ZARM`s drop tower facility meet new requirements of the experimental hardware and may lead to some technical constraints in the setups. In any case the ZARM Drop Tower Operation and Service Company (ZARM FAB mbH) maintaining the drop tower facility is prepared to as-sist experimentalists by offering own air-conditioned laboratories, clean rooms, workshops and consulting engineers, as well as scientific personal. Furthermore, ZARM`s on-site apartment can be used for accommodations during the experiment campaigns. In terms of approaching drop tower experimenting, consulting of experimentalists is mandatory to successfully accomplish the pursued drop or catapult capsule experiment. For this purpose there will be a lot of expertise and help given by ZARM FAB mbH in strong cooperation to-gether with the experimentalists. However, in comparison to standard laboratory setups the drop or catapult capsule setup seems to be completely different at first view. While defining a

  1. Lessons Learned from Missing Flooding Barriers Operating Experience

    International Nuclear Information System (INIS)

    Simic, Z.; Veira, M. P.

    2016-01-01

    Flooding hazard is highly significant for nuclear power plant safety because of its potential for common cause impact on safety related systems, and because operating experience reviews regularly identify flooding as a cause of concern. Source of the flooding could be external (location) or internal (plant design). The amount of flooding water could vary but even small amount might suffice to affect redundant trains of safety related systems for power supply and cooling. The protection from the flooding is related to the design-basis flood level (DBFL) and it consists of three elements: structural, organizational and accessibility. Determination of the DBFL is critical, as Fukushima Daiichi accident terribly proved. However, as the topic of flooding is very broad, the scope of this paper is focused only on the issues related to the missing flood barriers. Structural measures are physically preventing flooding water to reach or damage safety related system, and they could be permanent or temporary. For temporary measures it is important to have necessary material, equipment and organizational capacity for the timely implementation. Maintenance is important for permanent protection and periodical review is important for assuring readiness and feasibility of temporary flooding protection. Final flooding protection element is assured accessibility to safety related systems during the flooding. Appropriate flooding protection is based on the right implementation of design requirements, proper maintenance and periodic reviews. Operating experience is constantly proving how numerous water sources and systems interactions make flooding protection challenging. This paper is presenting recent related operating experience feedback involving equipment, procedures and analysis. Most frequent deficiencies are: inadequate, degraded or missing seals that would allow floodwaters into safety related spaces. Procedures are inadequate typically because they underestimate necessary

  2. Early experience with transfemoral endovascular aneurysm management (TEAM) in the treatment of aortic aneurysms

    NARCIS (Netherlands)

    Balm, R.; Eikelboom, B. C.; May, J.; Bell, P. R.; Swedenborg, J.; Collin, J.

    1996-01-01

    OBJECTIVES: To evaluate the early experience with transfemoral endovascular aortic aneurysm management using the Endovascular Grafting System. DESIGN: Multi-centre prospective evaluation of the implantation procedure and early results (median follow-up 153 days). SETTING: Department of Surgery,

  3. Risk management for operations of the LANL Critical Experiments Facility

    International Nuclear Information System (INIS)

    Paternoster, R.; Butterfield, K.

    1998-01-01

    The Los Alamos Critical Experiments Facility (LACEF) currently operates two burst reactors (Godiva-IV and Skua), one solution assembly [the Solution High-Energy Burst Assembly (SHEBA)], two fast-spectrum benchmark assemblies (Flattop and Big Ten), and five general-purpose remote assembly machines that may be configured with nuclear materials and assembled by remote control. Special nuclear materials storage vaults support these and other operations at the site. With this diverse set of operations, several approaches are possible in the analysis and management of risk. The most conservative approach would be to write a safety analysis report (SAR) for each assembly and experiment. A more cost-effective approach is to analyze the probability and consequences of several classes of operations representative of operations on each critical assembly machine and envelope the bounding case accidents. Although the neutron physics of these machines varies widely, the operations performed at LACEF fall into four operational modes: steady-state mode, approach-to-critical mode, prompt burst mode, and nuclear material operations, which can include critical assembly fuel loading. The operational sequences of each mode are very nearly identical, whether operated on one assembly machine or another. The use of an envelope approach to accident analysis is facilitated by the use of classes of operations and the use of bounding case consequence analysis. A simple fault tree analysis of operational modes helps resolve which operations are sensitive to human error and which are initiated by hardware of software failures. Where possible, these errors and failures are blocked by TSR LCOs. Future work will determine the probability of accidents with various initiators

  4. Radiological operating experience at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Bunch, W.L.; Prevo, P.R.

    1986-11-01

    The Fast Flux Test Facility has been in operation for approximately five years, including about one thousand days of full power operation of the Fast Test Reactor. During that time the collective dose equivalents received by operating personnel have been about two orders of magnitude lower than those typically received at commercial light water reactors. No major contamination problems have been encountered in operating and maintaining the plant, and release of radioactive gas to the environment has been minimal and well below acceptable limits. All shields have performed satisfactorily. Experience to date indicates an apparent radiological superiority of liquid metal reactor systems over current light water plants

  5. Operational Experience from Solar Thermal Energy Projects

    Science.gov (United States)

    Cameron, C. P.

    1984-01-01

    Over the past few years, Sandia National Laboratories were involved in the design, construction, and operation of a number of DOE-sponsored solar thermal energy systems. Among the systems currently in operation are several industrial process heat projects and the Modular Industrial Solar Retrofit qualification test systems, all of which use parabolic troughs, and the Shenandoah Total Energy Project, which uses parabolic dishes. Operational experience has provided insight to both desirable and undesirable features of the designs of these systems. Features of these systems which are also relevant to the design of parabolic concentrator thermal electric systems are discussed. Other design features discussed are system control functions which were found to be especially convenient or effective, such as local concentrator controls, rainwash controls, and system response to changing isolation. Drive systems are also discussed with particular emphasis of the need for reliability and the usefulness of a manual drive capability.

  6. Early Life Experiences and Exercise Associate with Canine Anxieties.

    Directory of Open Access Journals (Sweden)

    Katriina Tiira

    Full Text Available Personality and anxiety disorders across species are affected by genetic and environmental factors. Shyness-boldness personality continuum exists across species, including the domestic dog, with a large within- and across-breed variation. Domestic dogs are also diagnosed for several anxiety-related behavioral conditions, such as generalized anxiety disorders, phobias, and separation anxiety. Genetic and environmental factors contributing to personality and anxiety are largely unknown. We collected questionnaire data from a Finnish family dog population (N = 3264 in order to study the associating environmental factors for canine fearfulness, noise sensitivity, and separation anxiety. Early life experiences and exercise were found to associate with anxiety prevalence. We found that fearful dogs had less socialization experiences (p = 0.002 and lower quality of maternal care (p < 0.0001 during puppyhood. Surprisingly, the largest environmental factor associating with noise sensitivity (p < 0.0001 and separation anxiety (p = 0.007 was the amount of daily exercise; dogs with noise sensitivity and separation anxiety had less daily exercise. Our findings suggest that dogs share many of the same environmental factors that contribute to anxiety in other species as well, such as humans and rodents. Our study highlights the importance of early life experiences, especially the quality of maternal care and daily exercise for the welfare and management of the dogs, and reveals important confounding factors to be considered in the genetic characterization of canine anxiety.

  7. Starting Smart: How Early Experiences Affect Brain Development. Second Edition.

    Science.gov (United States)

    Hawley, Theresa

    Based on recent research, it is now believed that brain growth is highly dependent upon children's early experiences. Neurons allow communication and coordinated functioning among various brain areas. Brain development after birth consists of an ongoing process of wiring and rewiring the connections among neurons. The forming and breaking of…

  8. Operating experience with superconducting cavities at Jefferson Lab

    International Nuclear Information System (INIS)

    Reece, C.E.

    1998-01-01

    The CEBAF recirculating superconducting electron linac at Jefferson Lab is now in full operation supporting nuclear physics experiments in three target halls at up to 4.4 GeV. The 330 SRF cavities, operating at 2.0 K, continue to perform well above design specifications, and have accumulated over 8,000,000 operating cavity hours. The authors have to date no evidence of degradation of cavity performance. The SRF cavities have demonstrated excellent reliability. The one klystron per cavity design provides CEBAF with flexibility and redundancy for normal operations. Several techniques have been developed for establishing optimum operating conditions for the 330 independent systems. Operation of the cavities and control systems at the full design current of 1 mA has recently been achieved. The principal constraints on usable gradient for low current operations are (1) discharge at the cold ceramic rf window induced by electron field emission in cavities, (2) tuner controls, and (3) stability of the waveguide vacuum in the region between the warm and cold windows. Several cryomodules have been improved by application of rf helium processing while installed on the beamline

  9. Experiment operations plan for the MT-4 experiment in the NRU reactor

    International Nuclear Information System (INIS)

    Russcher, G.E.; Wilson, C.L.; Parchen, L.J.; Marshall, R.K.; Hesson, G.M.; Webb, B.J.; Freshley, M.D.

    1983-06-01

    A series of thermal-hydraulic and cladding materials deformation experiments were conducted using light-water reactor fuel bundles as part of the Pacific Northwest Laboratory Loss-of-Coolant Accident (LOCA) Simulation Program. This report is the formal operations plan for MT-4 - the fourth materials deformation experiment conducted in the National Research Universal (NRU) reactor, Chalk River, Ontario, Canada. A major objective of MT-4 was to simulate a pressurized water reactor LOCA that could induce fuel rod cladding deformation and rupture due to a short-term adiabatic transient and a peak fuel cladding temperature of 1200K (1700 0 F)

  10. Operating experience with gamma ray irradiators

    International Nuclear Information System (INIS)

    Fraser, F.M.; Ouwerkerk, T.

    1980-01-01

    The experience of Atomic Energy of Canada, Limited (AECL) with radioisotopes dates back to the mid-1940s when radium was marketed for medical purposes. Cobalt-60 came on the scene in 1949 and within a few years a thriving business in cancer teletherapy machines and research irradiators was developed. AECL's first full-scale cobalt-60 gamma ray sterilizer for medical products was installed in 1964. AECL now has over 50 plants and 30 million curies in service around the world. Sixteen years of design experience in cobalt-60 sources, radiation shielding, safety interlock systems, and source pass mechanisms have made gamma irradiators safe, reliable, and easy to operate. This proven technology is being applied in promising new fields such as sludge treatment and food preservation. Cesium-137 is expected to be extensively utilized as the gamma radiation source for these applications

  11. Developing a discrete choice experiment in Malawi: eliciting preferences for breast cancer early detection services

    Directory of Open Access Journals (Sweden)

    Kohler RE

    2015-10-01

    Full Text Available Racquel E Kohler,1 Clara N Lee,2 Satish Gopal,3 Bryce B Reeve,1 Bryan J Weiner,1 Stephanie B Wheeler11Department of Health Policy and Management, Gillings School of Global Public Health, 2Lineberger Comprehensive Cancer Center, University of North Carolina at Chapel Hill, Chapel Hill, NC, USA; 3UNC Project-Malawi, Tidziwe Center, Lilongwe, MalawiBackground: In Malawi, routine breast cancer screening is not available and little is known about women’s preferences regarding early detection services. Discrete choice experiments are increasingly used to reveal preferences about new health services; however, selecting appropriate attributes that describe a new health service is imperative to ensure validity of the choice experiment.Objective: To identify important factors that are relevant to Malawian women’s preferences for breast cancer detection services and to select attributes and levels for a discrete choice experiment in a setting where both breast cancer early detection and choice experiments are rare.Methods: We reviewed the literature to establish an initial list of potential attributes and levels for a discrete choice experiment and conducted qualitative interviews with health workers and community women to explore relevant local factors affecting decisions to use cancer detection services. We tested the design through cognitive interviews and refined the levels, descriptions, and designs.Results: Themes that emerged from interviews provided critical information about breast cancer detection services, specifically, that breast cancer interventions should be integrated into other health services because asymptomatic screening may not be practical as an individual service. Based on participants’ responses, the final attributes of the choice experiment included travel time, health encounter, health worker type and sex, and breast cancer early detection strategy. Cognitive testing confirmed the acceptability of the final attributes

  12. Experiment on continuous operation of the Brazilian IEA-R1 research reactor

    International Nuclear Information System (INIS)

    Freitas Pintaud, M. de

    1994-01-01

    In order to increase the radioisotope production in the IEA-R1 research reactor at IPEN/CNEN-SP, it has been proposed a change in its operation regime from 8 hours per day and 5 days per week to continuous 48 hours per week. The necessary reactor parameters for this new operation regime were obtained through an experiment in which the reactor was for the first time operated in the new regime. This work presents the principal results from this experiment: xenon reactivity, new shutdown margins, and reactivity loss due to fuel burnup in the new operation regime. (author)

  13. Developing a discrete choice experiment in Malawi: eliciting preferences for breast cancer early detection services.

    Science.gov (United States)

    Kohler, Racquel E; Lee, Clara N; Gopal, Satish; Reeve, Bryce B; Weiner, Bryan J; Wheeler, Stephanie B

    2015-01-01

    In Malawi, routine breast cancer screening is not available and little is known about women's preferences regarding early detection services. Discrete choice experiments are increasingly used to reveal preferences about new health services; however, selecting appropriate attributes that describe a new health service is imperative to ensure validity of the choice experiment. To identify important factors that are relevant to Malawian women's preferences for breast cancer detection services and to select attributes and levels for a discrete choice experiment in a setting where both breast cancer early detection and choice experiments are rare. We reviewed the literature to establish an initial list of potential attributes and levels for a discrete choice experiment and conducted qualitative interviews with health workers and community women to explore relevant local factors affecting decisions to use cancer detection services. We tested the design through cognitive interviews and refined the levels, descriptions, and designs. Themes that emerged from interviews provided critical information about breast cancer detection services, specifically, that breast cancer interventions should be integrated into other health services because asymptomatic screening may not be practical as an individual service. Based on participants' responses, the final attributes of the choice experiment included travel time, health encounter, health worker type and sex, and breast cancer early detection strategy. Cognitive testing confirmed the acceptability of the final attributes, comprehension of choice tasks, and women's abilities to make trade-offs. Applying a discrete choice experiment for breast cancer early detection was feasible with appropriate tailoring for a low-income, low-literacy African setting.

  14. Air-operated valve diagnostics: requirements, programmes and experiences

    International Nuclear Information System (INIS)

    Cervilla, Remedios; Vallana, Fernando; Laporta, Jose Maria

    2014-01-01

    The aim of this paper is to present some elements in the field of air-operated valve (AOV) diagnostics from the perspective of Tecnatom, as a testing services provider in the national and international nuclear park. Throughout the following lines, we summarize the regulatory framework existing in Spain and the current practices in Spanish nuclear power plants regarding the AOV programs, the role of Tecnatom as a service provider and our testing techniques. Finally, a real test case is presented, to illustrate the value of diagnostic as predictive maintenance and early degradation detection tool. (authors)

  15. Operating experience with nuclear power stations in Member States in 1997

    International Nuclear Information System (INIS)

    1998-12-01

    This report is twenty-ninth in the IAEA series of annual reports on operating experience with nuclear power stations in Member States. The report is a direct output from the Agency's Power Reactor Information System (PRIS), whose database contains all operating experience data published in Agency's operating experience annual reports published since 1971 and basic information on power reactors, including design data. According to the information available to the Agency at the end of 1997, there were 437 nuclear power reactors having a total capacity of 351795 MW(e). During 1997 three new reactors having total capacity of 3555 MW(e) were connected to the grid in France and the Republic of Korea. There were 36 nuclear power plants under construction in the world. Load, operation and availability factors are used as the basic performance factors. In addition to annual performance data and outage information, the report contains a historical summary of performance and outages during the lifetime of individual plants and five figures illustrating worldwide performance and statistical data

  16. Operation experience with the TRIGA reactor Wien 2004

    International Nuclear Information System (INIS)

    Boeck, H.; Villa, M.

    2004-01-01

    The TRIGA Mark-II reactor in Vienna is now in operation for more than 42 years. The average operation time is about 230 days per year with 90 % of this time at nominal power of 250 kW. The remaining 10 % operation time is used for students' training courses at low power level. Pulse operation is rather infrequent with about 5 to 10 pulses per year. The utilization of this facility is excellent, the number of students participating in practical exercises has strongly increased, and also training courses for outside groups such as the IAEA or for the 2004 Eugene Wigner Course are using the reactor, because it is the only TRIGA reactor remaining in Austria. Therefore, there is no need for decommissioning and it is intended to operate it as long as possible into the next decade. Nevertheless, in early 2004 it was decided to prepare a report on a decommissioning procedure for a typical TRIGA Mark II reactor which lists the volumes, the activity and the weight of individual materials such as concrete, aluminium, stainless steel, graphite and others which will accumulate during this process (a summary of possible activated and contaminated materials and the activity of a single TRIGA fuel element as a function of fuel type and decay time in Bq is presented). The status of the reactor (instrumentation, fuel elements, cooling circuit, ventilation system, re-inspection and maintenance program, cost/benefit) is outlined. (nevyjel)

  17. Operating experiences with Neutron Overpower Trip Systems in Ontario Hydro's CANDU nuclear plants

    International Nuclear Information System (INIS)

    Hnik, J.; Kozak, J.

    1991-01-01

    Operating experiences with Neutron Over Power Trip (NOP) Systems in different Ontario Hydro CANDU nuclear power plants are discussed. Lessons learned from the system operation and their impact on design improvements are presented. Retrofitting of additional tools, such as Shutdown System Monitoring computers, to improve operator interaction with the system is described. Experiences with the reliability of some of the NOP system components is also discussed. Options for future enhancements of system performance and operability are identified. (author)

  18. Estimation of efficiency of new local rehabilitation method at the early post-operative period after dental implantation

    Directory of Open Access Journals (Sweden)

    A. V. Pasechnik

    2017-01-01

      Summary Despite of success of dental implantation, there are often complications at the early post-operative period of implant placing associated with wound damage and aseptic inflammation. Purpose of the work is studying clinical efficiency of combined local application of new mucosal gel “Apior” and magnetotherapy at the early post-operative period after dental implantation. Combined local application of the mucosal gel “Apior” and pulsating low-frequency electromagnetic field in the complex medical treatment of patients after conducting an operation of setting dental implants favourably affects the common state of patients and clinical symptoms of inflammation in the area of operating wound. As compared with patients who had traditional anti-inflammatory therapy, the patients treated with local application of apigel and magnetoterapy had decline of edema incidence, of gingival mucosa hyperemia, of discomfort in the area of conducted operation. There occurred more rapid improvement of inflammation painfulness, which correlated with the improvement of hygienic state of oral cavity and promoted to prevention of bacterial content of damaged mucous surfaces. Estimation of microvasculatory blood stream by the method of ultrasonic doppler flowmetry revealed more rapid normalization of volume and linear high systole speed of blood stream in the periimplant tissues in case of use of new complex local rehabilitation method, that testified to the less pronounced inflammation of oral mucosa after the operation. The authors came to conclusion that the local application of the offered method of medical treatment of early post-operative complications of dental implantation reduces terms of renewal of structural-functional integrity of oral mucosa, helps in preventing development of inflammatory complications and strengthening endosseus implant. The inclusion in the treatment management of a new combined method of application of mucosal gel “Apior” and

  19. The importance for nuclear safety of efficient feedback of operational experience

    International Nuclear Information System (INIS)

    1987-09-01

    Experience of practical operation is a valuable source of information for improving and optimizing the safety and reliability of nuclear power plants. Therefore it is essential to collect information on abnormal events occurring at plants during operation and on all deviations from normal performance by systems and personnel that could be precursors of accidents. For this purpose it is necessary to establish hierarchical systems to feedback operational safety experience at utility, national and international levels and to make these systems as effective as possible. The present report attempts to identify the safety objectives of these systems, to analyse the difficulties presently encountered and to suggest possible improvements

  20. Implementation of utilities operation and maintenance experience into the European pressurized water reactor design

    International Nuclear Information System (INIS)

    Zaiss, W.; Lallier, M.

    1999-01-01

    Since 1992 Electricite de France EDF and German Utilities GU work together with Nuclear Power International NPI, a subsidiary of Framatome and Siemens, in the development of the future European Pressurized Water Reactor EPR. The EPR is an evolutionary concept, based on the French N4 plants and the German KONVOI plants. From the beginning, experienced operation and maintenance people from the precursor plants participate at the design process. Their experience will lead to a plant, which is not only characterised by low investment costs, but also by good operability, high availability and low operation and maintenance costs. No expensive back-fittings should be necessary after commissioning, to reach these availability and maintenance targets. The utility specialists give design requirements for outage performance, system design, and layout. These design requirements are really determining the system performances, and not what was design basis before. It does not necessarily lead to system increases. Mainly it is a shifting of the emphasis to other items. There are even cases, where the system performances can be reduced. Mostly very small modifications, which are nearly cost neutral when implemented early in the design, have big impact on the further operation. If there are big cost influences, a sound balance between investment and gained availability is made together with the designers. There is very fruitful discussion between designers and operators, which is highly estimated by both sides. In this frame also new, revolutionary ideas are coming up, which are going mostly in the direction of investment cost reduction, without loosing operation freedom. It is the first time in Europe, that designers and operators are working so close together. It is also the first time, that the management and the decision making is dominated by the utilities. (author)

  1. Operating experience with nuclear power plants 2013; Betriebserfahrungen mit Kernkraftwerken 2013

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2014-07-01

    The VGB Technical Committee 'Nuclear Plant Operation' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2013, events important to plant safety, special and relevant repair, and retrofit measures from Belgium, Germany, Finland, the Netherlands, Switzerland, and Spain. (orig.)

  2. Best practices in the utilization and dissemination of operating experience at nuclear power plants

    International Nuclear Information System (INIS)

    2008-03-01

    IAEA Safety Standards Series No. SF-1 entitled Fundamental Safety Principles: Safety Fundamentals states the need for operating organizations to establish a programme for the collection and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to relevant national and international organizations, operating experience is utilized and corrective actions are effectively implemented. This publication has been developed to provide advice and assistance to nuclear installations and related institutions, including contractors and support organizations, to strengthen and enhance their own feedback process through the implementation of best practices in the utilization and dissemination of operating experience and to assess their effectiveness. Dissemination and utilization of internal and external operating experience is essential in supporting a proactive safety management approach of preventing events from occurring. Few new events reveal a completely new cause or failure mechanism. Although not recognized prior to the event, most subsequent investigations identify internal or external industry operating experience that, if applied effectively, would have prevented the event. Therefore, the establishment of an effective utilization and dissemination process is very beneficial in raising awareness of the organization and individuals of available operating experience, and focussing effort in the implementation of the lessons learnt. This leads to improved safety and reliability. The present publication is the outcome of a coordinated effort involving the participation of experts of nuclear organizations in several Member States. It was written to complement the publication IAEA Services Series No. 10 entitled PROSPER Guidelines - Guidelines for Peer Review and for Plant Self-assessment of

  3. Assessment of LWR piping design loading based on plant operating experience

    International Nuclear Information System (INIS)

    Svensson, P.O.

    1980-08-01

    The objective of this study has been to: (1) identify current Light Water Reactor (LWR) piping design load parameters, (2) identify significant actual LWR piping loads from plant operating experience, (3) perform a comparison of these two sets of data and determine the significance of any differences, and (4) make an evaluation of the load representation in current LWR piping design practice, in view of plant operating experience with respect to piping behavior and response to loading

  4. Tritium Room Air Monitor Operating Experience Review

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Cadwallader; B. J. Denny

    2008-09-01

    Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

  5. Effects of Cyberbullying Experience and Cyberbullying Tendency on School Violence in Early Adolescence

    Science.gov (United States)

    Cho, Mi-Kyoung; Kim, Miyoung

    2017-01-01

    Background: School violence in early adolescence, whose frequency and status have recently changed significantly. Objective: This study attempts to detect the cyber bullying inclination of youth in early adolescence when aggressiveness reaches its peak, to identify school violence, and to develop a school violence prevention program. Method: This study was a survey research, investigating participants who were 470 middle school students in South Korea. For the analysis, independent t-test, one-way ANOVA and hierarchical regression analysis. Results: It is suggested that the school violence victimization experience and cyber bullying infliction experience has an influence in the school violence infliction. And the cyber bullying victimization experience and school violence victimization experience variables exert effects. Conclusion: The results of this study suggest that school nurses who are connecting to the community-school-home should take an active part in the development of school violence mediation education program, considering the cultural characteristics of the country. PMID:29081871

  6. Effect of peri-operative chemotherapy on the quality of life of patients with early breast cancer

    NARCIS (Netherlands)

    Kiebert, G. M.; Hanneke, J.; de Haes, J. Hanneke C. J. M.; Kievit, J.; van de Velde, C. J.

    1990-01-01

    Since chemotherapy is assumed to have a negative impact on quality of life, the impact of peri-operative chemotherapy on physical, psychological and social well-being and on the activity level of patients with early stage breast cancer was investigated. 24 women received peri-operative chemotherapy

  7. Feedback of operation and maintenance experience into evolutionary plant design (HWRs)

    International Nuclear Information System (INIS)

    Hedges, K.R.; Sanatkumar, A.; Kwon, Oh-Cheol

    1999-01-01

    The process of feeding back operation and maintenance information into the CANDU plant design process has been in constant evolution since the beginning of the CANDU program. The commissioning and operation experience from the first commercial reactors at Pickering A and Bruce A was used extensively in the design of the first generation CANDU 6 Plants. These units have been in operation for 15 years, producing electricity at an average lifetime capacity factor of about 85%. In further advancing the CANDU 6 and 9 design, greater emphasis is placed on enhancements that can reduce operational costs and further improve plant performance by reducing the planned outage time. The plant design has been improved to facilitate maintenance scheduling, equipment isolation, maintenance and post maintenance testing. Individual tasks have been analyzed as well as the interaction between tasks during outages to reduce the down time required and simplify the execution of the work. This results in shorter outages, reduced radioactive dose and reduced costs. The Utilities have continued to play an important role in CANDU 6 Evolution. Specifically; the Korea Utility KEPCO has one of the original four CANDU 6 Plants and three of the most modem. Their feedback to the designers has been very helpful. One of the most important feedback processes is through the CANDU Owners Group, which provides information exchange between members. In India eight PHWRs of 220 MWe capacity are in operation. Four reactors, also of 220 MWe capacity are in advanced stages of construction. Site construction work of two units of 500 MWe PHWRs at Tarapur will be taken up shortly. Over the years, during construction and operation of these power stations, a large amount of experience has been accumulated. Operation and maintenance experience is shared with operating stations by intensive participation of design engineers in Station Operation Review meetings, trouble shooting and root cause analysis of problems

  8. Review of BNFL's operational experience of wet type flasks

    International Nuclear Information System (INIS)

    McWilliam, D.S.

    2004-01-01

    BNFL International Transport's operational experience includes shipping 6000te of spent fuel from Japan to Sellafield, through its dedicated terminal at Barrow, and to Cogema La Hague. This fuel was shipped under the PNTL (Pacific Nuclear Transport Ltd) banner for which BNFL is responsible. PNTL owned and operated a fleet of 5 ships for Japanese business and a fleet of 80 wet and 58 dry flasks, for the transport of Light Water Reactor (LWR) spent fuel, from both Pressurised Water Reactors (PWR) and Boiling Water Reactors (BWR). ''Wet'' or ''dry'' flask is the common terminology used to distinguish between spent fuel flasks transporting fuel where the fuel is immersed in water, or spent fuel flasks that have been drained of water and dried. This paper concentrates on the wet type of flask utilised to transport fuel to Sellafield, that is the Excellox type (including similar type NTL derivatives). It aims to provide a summary of operational experience during handling at power stations, shipment, unloading at reprocessors and from scheduled maintenance

  9. IRS Guidelines: Joint IAEA/NEA International Reporting System for Operating Experience

    International Nuclear Information System (INIS)

    2010-01-01

    The International Reporting System for Operating Experience (IRS) is an international system jointly operated by the International Atomic Energy Agency (IAEA) and the OECD Nuclear Energy Agency (OECD/NEA). The fundamental objective of the IRS is to contribute to improving the safety of commercial nuclear power plants which are operated worldwide. This objective can be achieved by providing timely and detailed information on lessons learned from operating and construction experience at the international level. This information could be related to issues and events that are related to safety. The purpose of these guidelines is to describe the system and to give users the necessary background and guidance to enable them to produce IRS reports meeting a high standard of quality while retaining the effectiveness of the system expected by all Member States operating nuclear power plants. As this system is owned by the Member States, the IRS Guidelines have been developed and approved by the IRS National Co-ordinators with the assistance of both Secretariats (IAEA/NEA).

  10. Microwave tokamak experiment (MTX) first year of operation and future plans

    International Nuclear Information System (INIS)

    Jackson, M.C.

    1989-01-01

    The Microwave Tokamak Experiment (MTX) at Lawrence Livermore National Laboratory (LLNL) began plasma operations in November 1988, and our main goal is the study of electron-cyclotron heating (ECH) in plasma discharges. The MTX tokamak was relocated from the Massachusetts Institute of Technology (MIT), and we have re-created plasma parameters that are similar to those generated while the tokamak was at MIT. After stable ohmic operation was achieved, single-pulse FEL heating experiments began. During this phase, the FEL operated at low power levels on the way to its ultimate goal of 2 GW and 140 GHz with a 30-ns pulse length. We have developed a number of new diagnostics to measure these fast FEL pulses and the resulting plasma effects. In this paper, we present results that show the correlation of MTX data with MIT data, some of the operational modifications and procedures used, results to date from preliminary tokamak operations with the FEL, and our near-term operational plans. 7 refs., 8 figs., 1 tab

  11. Operational experience with Seibersdorf low-level incinerator

    International Nuclear Information System (INIS)

    Chalupa, G.

    1987-01-01

    This report contains information about an excess air incinerator which burned low level β and γ wastes (also α up to determined limits). The incinerator was started up in 1980 and it is clear that in a technical plant of such magnitude, some changes and alterations will be needed to be overcome according to the experiences of operation. This paper - after a short description of the incinerator plant itself - gives a summary of some of the operation and the changes which are made in the plant according to these facts. A partial redesign of the incinerator plant in the first half of 1985 resulted in a very satisfying new design, which proved its superiority during the runs in 1985 and 1986

  12. Relationships between early alcohol experiences, drinker self-schema, drinking and smoking in college students.

    Science.gov (United States)

    Lee, Chia-Kuei; Corte, Colleen; Stein, Karen F

    2018-02-23

    Drinking and smoking commonly co-occur in undergraduate students. Although an identity as a drinker is a known predictor of alcohol use and alcohol problems, and early evidence suggests that it also predicts smoking, the role of these behaviors in the development of an identity as a drinker is unknown. In this study, we conceptualized a drinker identity as an enduring memory structure referred to as a self-schema, and conducted a preliminary investigation of the relationships between early drinking experiences, drinker self-schema, and alcohol and tobacco use in undergraduate students. Three-hundred thirty undergraduates who reported current alcohol and tobacco use were recruited for an on-line survey study. Frequency of alcohol and tobacco use in the past 30 days, drinker self-schema, and early experiences with alcohol were measured. Structural equation modeling showed parental alcohol problems were associated with early onset of drinking. Early onset of drinking and high school friends' drinking were associated with more alcohol use and alcohol-related problems in high school. Alcohol problems during high school were associated with high drinker self-schema scores, which were associated with high frequency of alcohol and tobacco use during college. The indirect effects through the drinker self-schema were significant. Though cross-sectional, this preliminary examination supports theoretical predictions that early alcohol experiences may contribute to development of the drinker self-schema, which as expected, was positively associated with alcohol and tobacco use in college. Longitudinal studies that track the unfolding of drinking behavior and the contextual factors that are associated with it on the development of the self-drinker schema are essential to confirm the theoretical model. If supported, implications for intervention at different developmental stages to prevent early onset of drinking, limit adolescent alcohol use, and modify the development of a

  13. Reviewing operational experience feedback

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this document is to provide detailed supplementary guidance to OSART experts to aid in the evaluation of operational experience feedback (OEF) programmes at nuclear power plants. The document begins by describing the objectives of an OEF programme. It goes on to indicate preparatory work and investigatory guidance for the expert. Section 5 describes attributes of an excellent OEF programme. Appended to these guidelines are examples of OEF documents from various plants. These are intended to help the expert by demonstrating the actual implementation of OEF in practice. These guidelines are in no way intended to conflict with existing national regulations and rules. A comprehensive OEF programme, as described in Section 2, would be impossible to evaluated in detail in the amount of time typically allocated for assessing OEF in an OSART review. The expert must use his or her time wisely by concentrating on those areas that appear to be the weakest

  14. Operating Experience from Events Reported to the IAEA Incident Reporting System for Research Reactors

    International Nuclear Information System (INIS)

    2015-03-01

    Operating experience feedback is an effective mechanism in providing lessons learned from events and the associated corrective actions to prevent them, helping to improve safety at nuclear installations. The Incident Reporting System for Research Reactors (IRSRR), which is operated by the IAEA, is an important tool for international exchange of operating experience feedback for research reactors. The IRSRR reports contain information on events of safety significance with their root causes and lessons learned which help in reducing the occurrence of similar events at research reactors. To improve the effectiveness of the system, it is essential that national organizations demonstrate an appropriate interest for the timely reporting of events important to safety and share the information in the IRSRR database. At their biennial technical meetings, the IRSRR national coordinators recommended collecting the operating experience from the events reported to the IRSRR and disseminating it in an IAEA publication. This publication highlights the root causes, safety significance, lessons learned, corrective actions and the causal factors for the events reported to the IRSRR up to September 2014. The publication also contains relevant summary information on research reactor events from sources other than the IRSRR, operating experience feedback from the International Reporting System for Operating Experience considered relevant to research reactors, and a description of the elements of an operating experience programme as established by the IAEA safety standards. This publication will be of use to research reactor operating organizations, regulators and designers, and any other organizations or individuals involved in the safety of research reactors

  15. Learning From Experience: Improving Early Tracheal Extubation Success After Congenital Cardiac Surgery.

    Science.gov (United States)

    Winch, Peter D; Staudt, Anna M; Sebastian, Roby; Corridore, Marco; Tumin, Dmitry; Simsic, Janet; Galantowicz, Mark; Naguib, Aymen; Tobias, Joseph D

    2016-07-01

    The many advantages of early tracheal extubation following congenital cardiac surgery in young infants and children are now widely recognized. Benefits include avoiding the morbidity associated with prolonged intubation and the consequences of sedation and positive pressure ventilation in the setting of altered cardiopulmonary physiology. Our practice of tracheal extubation of young infants in the operating room following cardiac surgery has evolved and new challenges in the arena of postoperative sedation and pain management have appeared. Review our institutional outcomes associated with early tracheal extubation following congenital cardiac surgery. Inclusion criteria included all children less than 1 year old who underwent congenital cardiac surgery between October 1, 2010, and October 24, 2013. A total of 416 patients less than 1 year old were included. Of the 416 patients, 234 underwent tracheal extubation in the operating room (56%) with 25 requiring reintubation (10.7%), either immediately or following admission to the cardiothoracic ICU. Of the 25 patients extubated in the operating room who required reintubation, 22 failed within 24 hours of cardiothoracic ICU admission; 10 failures were directly related to narcotic doses that resulted in respiratory depression. As a result of this review, we have instituted changes in our cardiothoracic ICU postoperative care plans. We have developed a neonatal delirium score, and have adopted the "Kangaroo Care" approach that was first popularized in neonatal ICUs. This provision allows for the early parental holding of infants following admission to the cardiothoracic ICU and allows for appropriately selected parents to sleep in the same beds alongside their postoperative children.

  16. Operating experience with LAMPF main beam lines instrumentation and control system

    International Nuclear Information System (INIS)

    van Dyck, O.B.; Harvey, A.; Howard, H.H.; Roeder, D.L.

    1975-01-01

    Instrumentation and control (I and C) for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF) main beam line is based upon central computer control through remote stations which provide input and output to most devices. Operating experience shows that the ability of the computer to give high-quality graphical presentation of the measurements enhances operator performance and instrument usefulness. Experience also shows that operator efficiency degrades rapidly with increasing instrument response time, that is, with increasing delay between the time a control is changed and the result can be observed. For this reason, instrumentation upgrade includes speeding up data acquisition and display times to under 10 s. Similarly, television-viewed phosphors are being retained where possible since their instantaneous response is very useful. Other upgrading of the instrumentation system is planned to improve data accuracy, reliability, redundancy, and instrument radiation tolerance. Past experience is being applied in adding or relocating devices to simplify tuning procedures. (U.S.)

  17. PRESSCA: A regional operative Early Warning System for landslides risk scenario assessment

    Science.gov (United States)

    Ponziani, Francesco; Stelluti, Marco; Berni, Nicola; Brocca, Luca; Moramarco, Tommaso

    2013-04-01

    The Italian national alert system for the hydraulic and hydrogeological risk is ensured by the National Civil Protection Department, through the "Functional Centres" Network, together with scientific/technical Support Centres, named "Competence Centres". The role of the Functional Centres is to alert regional/national civil protection network, to manage the prediction and the monitoring phases, thus ensuring the flow of data for the management of the emergency. The Umbria regional alerting procedure is based on three increasing warning levels of criticality for 6 sub-areas (~1200 km²). Specifically, for each duration (from 1 to 48 hours), three criticality levels are assigned to the rainfall values corresponding to a recurrence interval of 2, 5, and 10 years. In order to improve confidence on the daily work for hydrogeological risk assessment and management, a simple and operational early warning system for the prediction of shallow landslide triggering on regional scale was implemented. The system is primarily based on rainfall thresholds, which represent the main element of evaluation for the early-warning procedures of the Italian Civil Protection system. Following previous studies highlighting that soil moisture conditions play a key role on landslide triggering, a continuous physically-based soil water balance model was implemented for the estimation of soil moisture conditions over the whole regional territory. In fact, a decreasing trend between the cumulated rainfall values over 24, 36 and 48 hours and the soil moisture conditions prior to past landslide events was observed. This trend provides an easy-to-use tool to dynamically adjust the operational rainfall thresholds with the soil moisture conditions simulated by the soil water balance model prior to rainfall events. The application of this procedure allowed decreasing the uncertainties tied to the application of the rainfall thresholds only. The system is actually operational in real-time and it was

  18. The Use of Concrete Experiences in Early Childhood Mathematics Instruction.

    Science.gov (United States)

    Baroody, Arthur J

    2017-01-01

    Addressed are four key issues regarding concrete instruction: What is concrete? What is a worthwhile concrete experience? How can concrete experiences be used effectively in early childhood mathematics instruction? Is there evidence such experiences work? I argue that concrete experiences are those that build on what is familiar to a child and can involve objects, verbal analogies, or virtual images. The use of manipulatives or computer games, for instance, does not in itself guarantee an educational experience. Such experiences are worthwhile if they target and further learning (e.g., help children extend their informal knowledge or use their informal knowledge to understand and learn formal knowledge). A crucial guideline for the effective use of concrete experience is Dewey's principle of interaction-external factors (e.g., instructional activities) need to mesh with internal factors (readiness, interest). Cognitive views of concrete materials, such as the cognitive alignment perspective and dual-representation hypothesis, provide useful guidance about external factors but do not adequately take into account internal factors and their interaction with external factors. Research on the effectiveness of concrete experience is inconclusive because it frequently overlooks internal factors. © 2017 Elsevier Inc. All rights reserved.

  19. Nuclear power plant operating experience. Annual report, 1978

    International Nuclear Information System (INIS)

    Beebe, M.R.

    1979-12-01

    This report is the fifth in a series of reports issued annually that summarizes the operating experience of US nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure for each plant are presented. Summary highlights of these areas are discussed. The report includes 1978 data from 65 plants - 25 boiling water reactor plants and 40 pressurized water reactor plants. Discussion of radioactive effluents which has been a part of this report in previous years, has not been included in this issue because of late acquisition of data

  20. Operational experience of ATLAS SCT and Pixel Detector

    CERN Document Server

    Kocian, Martin; The ATLAS collaboration

    2017-01-01

    The ATLAS Inner Detector based on silicon sensors is consisting of a strip detector (SCT) and a pixel detector. It is the crucial component for vertexing and tracking in the ATLAS experiment. With the excellent performance of the LHC well beyond the original specification the silicon tracking detectors are facing substantial challenges in terms of data acquisition, radiation damage to the sensors, and SEUs in the readout ASICs. The approaches on how the detector systems cope with the demands of high luminosity operation while maintaining excellent performance through hardware upgrades, software and firmware algorithms, and operational settings, are presented.

  1. Analysis of operating experience of nuclear power plants

    International Nuclear Information System (INIS)

    Volta, G.; Amesz, J.; Mancini, G.

    1981-01-01

    The power reactors operating experience has been matter for studies at the Joint Research Centre of the C.E.C. with the aim of validating probabilistic analysis models and of setting up data banks concerning reliability, availability of components and systems and safety related events. The report shows problems encountered and solutions given to attain the goal. For what concerns validation, the need of more satisfactory models that could handle both the technical and the organizational aspects of an operating plant is shown. For what concerns the data banks the possibilities opened by a coherent international system of classification are underlined. (author)

  2. Early Experience with Technology-Based Eye Care Services (TECS): A Novel Ophthalmologic Telemedicine Initiative.

    Science.gov (United States)

    Maa, April Y; Wojciechowski, Barbara; Hunt, Kelly J; Dismuke, Clara; Shyu, Jason; Janjua, Rabeea; Lu, Xiaoqin; Medert, Charles M; Lynch, Mary G

    2017-04-01

    The aging population is at risk of common eye diseases, and routine eye examinations are recommended to prevent visual impairment. Unfortunately, patients are less likely to seek care as they age, which may be the result of significant travel and time burdens associated with going to an eye clinic in person. A new method of eye-care delivery that mitigates distance barriers and improves access was developed to improve screening for potentially blinding conditions. We present the quality data from the early experience (first 13 months) of Technology-Based Eye Care Services (TECS), a novel ophthalmologic telemedicine program. With TECS, a trained ophthalmology technician is stationed in a primary care clinic away from the main hospital. The ophthalmology technician follows a detailed protocol that collects information about the patient's eyes. The information then is interpreted remotely. Patients with possible abnormal findings are scheduled for a face-to-face examination in the eye clinic. Any patient with no known ocular disease who desires a routine eye screening examination is eligible. Technology-Based Eye Care Services was established in 5 primary care clinics in Georgia surrounding the Atlanta Veterans Affairs hospital. Four program operation metrics (patient satisfaction, eyeglass remakes, disease detection, and visit length) and 2 access-to-care metrics (appointment wait time and no-show rate) were tracked. Care was rendered to 2690 patients over the first 13 months of TECS. The program has been met with high patient satisfaction (4.95 of 5). Eyeglass remake rate was 0.59%. Abnormal findings were noted in 36.8% of patients and there was >90% agreement between the TECS reading and the face-to-face findings of the physician. TECS saved both patient (25% less) and physician time (50% less), and access to care substantially improved with 99% of patients seen within 14 days of contacting the eye clinic, with a TECS no-show rate of 5.2%. The early experience with

  3. Operational experience feedback in the World Association of Nuclear Operators (WANO)

    International Nuclear Information System (INIS)

    Revuelta, Ramon

    2004-01-01

    Operators in high-risk industries need to be learning organisations, learning from themselves and from the others. This presentation will describe how the nuclear industry is dealing in an integrated manner with the feedback of operating experience (OE), both internal and external, to increase the safety and reliability of power plants; it will describe how it: - investigates events; - reports events and analyses trends; - shares information to prevent recurrence; - performs corrective action and training; - performs assessments to verify effectiveness. The plants have achieved great improvements in performance overall, and to improve further, the industry is evolving. Instead of just learning from past events (reactive) it is now focusing on lower level indications of problems (precursors) through low level events reporting, trending and analysis. A hallmark of the industry is its desire to be self-critical. Emphasis is placed on improving the bottom quartile performing plants

  4. Self-assessment as an approach to improvement of efficient implementation of Ukrainian NPP operational experience

    International Nuclear Information System (INIS)

    Pecheritsya, L.M.; Lyigots'kij, O.Yi.; Pecheritsya, O.V.; Tarasenko, V.M.

    2012-01-01

    the paper contains a brief description of the procedure for implementation of operational experience, focuses on the role of self -assessment in efficient use of operational experience, presents a review of international and national practices of self-assessment and review of the main features, issues and ways to improve self-assessment of efficient use of operational experience in Ukraine

  5. Operating experience and radiation protection in RAPS-3 and 4 operations

    International Nuclear Information System (INIS)

    Khandelwal, Narendra; Dhakar, P.C.; Singh, G.K.; Gupta, Ashok

    2008-01-01

    Rajasthan Atomic Power Station (RAPS)-3 and 4 was designed and constructed using latest technological advancements in the field of nuclear energy. Operating experience of the station have taught many lessons and provided opportunities to take proactive corrective actions. Design modifications, effective implementation of radiological surveillance program and improvements in work culture have helped in achieving continual reduction in radiation exposures and effluent releases at the station. This paper discusses some of the modifications carried out at the station along with their radiological impacts. (author)

  6. HANARO operation experience in the year 2004

    International Nuclear Information System (INIS)

    Oh, Soo-Youl; Kim, Heonil; Cho, Yeong-Garp; Jun, Byung-Jin

    2006-01-01

    The experiences of the HANARO operation and maintenance in the year 2004 are presented in this article. The operation of HANARO, a 30 MW research reactor operated by the Korea Atomic Energy Research Institute (KAERI), aims at a safe and effective operation to enhance its utilization in various fields of scientific research and industry. Regardless of its importance of the routine operation, this article is devoted to rather unusual matters such as irregular maintenance events and incidents. Since the first criticality in 1995, it has been a long-cherished task to reach the designed power level of 30 MW from the temporarily approved 24 MW. By resolving the concern on the fuel integrity, the designed level could be licensed and, eventually, it was achieved last November. On the other hand, after its 9 years of operation, the mechanical integrity of the heavy water reflector tank was checked. The measurement of the vertical straightness of the tank inner shell indicated its integrity. Meanwhile, the HANARO fuel production facility was completed at the KAERI site, and it will begin to supply centrifugally atomized fuels, instead of conventional comminuted fuels, to HANARO shortly. There were several incidents in 2004, which have all been cleared, including a leak of heavy water, melting of a sample in an irradiation hole for the neutron activation analysis, and a condensation problem in a horizontal beam tube. The progress of and lessons from each incident are presented. The utilization of HANARO is expanding every year and the trend will also continue in 2005. The operation mode has been changed from an 18-day continuous operation and 10-day shutdown (18-10 mode) to the 23-12 mode since the end of 2004, and a further extension is planned to the 30-12 mode. Thanks to this extended operation term, an increased power level and, most importantly, a reliable operation, the HANARO is gaining more and more credit from the end users. (author)

  7. French experience in operating pressurized water reactor power stations. Ten years' operation of the Ardennes power station

    International Nuclear Information System (INIS)

    Teste du Bailler, A.; Vedrinne, J.F.

    1978-01-01

    In the paper the experience gained over ten years' operation of the Ardennes (Chooz) nuclear power station is summarized from the point of view of monitoring and control equipment. The reactor was the first pressurized water reactor to be installed in France; it is operated jointly by France and Belgium. The equipment, which in many cases consists of prototypes, was developed for industrial use and with the experience that has now been gained it is possible to evaluate its qualities and defects, the constraints which it imposes and the action that has to be taken in the future. (author)

  8. Early stage fuel cell funding

    International Nuclear Information System (INIS)

    Bergeron, C.

    2004-01-01

    'Full text:' Early stage venture funding requires an in depth understanding of both current and future markets as well as the key technical hurdles that need to be overcome for new technology to commercialize into successful products for mass markets. As the leading fuel cell and hydrogen investor, Chrysalix continuously reviews global trends and new technologies, evaluates them with industry leaders worldwide and tries to match them up with the best possible management teams when selecting its early stage investments. Chrysalix Energy Limited Partnership is an early-stage venture capital firm focusing on fuel cell and related fueling technology companies and is a private equity joint venture between Ballard Power Systems, BASF Venture Capital, The BOC Group, The Boeing Company, Duke Energy, Mitsubishi Corporation and Shell Hydrogen. Operating independently, Chrysalix offers a unique value proposition to its clients throughout the business planning, start-up and operations phases of development. Chrysalix provides early-stage funding to new companies as well as management assistance, technological knowledge, organized networking with industry players and experience in the management of intellectual property. (author)

  9. Risk management for operations of the Los Alamos critical experiments facility

    International Nuclear Information System (INIS)

    Paternoster, R.; Butterfield, K.

    1998-01-01

    The Los Alamos Critical Experiments Facility (LACEF) currently operates two burst reactors (Godiva-IV and Skua), one solution assembly (SHEBA 2--Solution high-Energy Burst Assembly), two fast-spectrum benchmark assemblies (Flattop and Big Ten), and five general-purpose remote assembly machines which may be configured with nuclear materials and assembled by remote control. SNM storage vaults support these and other operations at the site. With this diverse set of operations, several approaches are possible in the analysis and management of risk. The most conservative approach would be to write a safety analysis report (SAR) for each assembly and experiment. A more cost-effective approach is to analyze the probability and consequences of several classes of operations representative of operations on each critical assembly machine and envelope the bounding case accidents. Although the neutron physics of these machines varies widely, the operations performed at LACEF fall into four operational modes: steady-state mode, approach-to-critical mode, prompt burst mode, and nuclear material operations which can include critical assembly fuel loading. The operational sequences of each mode are very nearly the same, whether operated on one assembly machine or another. The use of an envelope approach to accident analysis is facilitated by the use of classes of operations and the use of bounding case consequence analysis. A simple fault tree analysis of operational modes helps resolve which operations are sensitive to human error and which are initiated by hardware of software failures. Where possible, these errors and failures are blocked by TSR LCOs

  10. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  11. Operating experience with nuclear power stations in Member States in 2002

    International Nuclear Information System (INIS)

    2003-11-01

    This report is the thirty-fourth in the Agency's series of annual reports on operating experience with nuclear power stations in Member States. The report is a direct output from the Agency's Power Reactor Information System (PRIS), whose database contains all operating experience data published in the Agency's operating experience annual reports since 1971 and basic information on power reactors, including design data. It presents operating experience data for all worldwide nuclear power plants after starting commercial operation. The PRIS databank is available free of charge to IAEA Member States through its two services: PRIS-PC and MicroPRIS. The PRIS-PC allows direct access to the database via telephone lines or through the Internet. The MicroPRIS contains a subset of the PRIS database and is a personal computer version of PRIS data available on diskette in a form readily accessible by standard, commercially available personal computer packages. PRIS is also available in the Internet at http://www.iaea.org/programmes/a2. Load, operation and availability factors are used as the basic performance factors. Energy unavailability factors, separate for planned and unplanned unavailability, due either to causes in the plant or causes external to the plant, are used as a measure of energy lost through a unit not being available. However, some ambiguity remains in the operator reports of the unavailability data, resulting in inconsistencies in these factors. It is recognized that there is an inherent difficulty in reporting unavailability in energy with relation to a maximum capacity which may change several times during the year. In addition, there are different practices in reporting planned and unplanned unavailability among Member States. The unavailability factors in this report should therefore be used with caution. It should be noted that, for load, operation and unavailability factors, there might be differences between the data of this report and those

  12. Regional co-operation in the nuclear field: The Nordic experience

    International Nuclear Information System (INIS)

    Marcus, F.R.

    1983-01-01

    Experience from 25 years of co-operation in the nuclear field between the Nordic countries is described. A pragmatic approach with a minimum of formalism is used. The co-operation takes place mainly through ''horizontal'' channels between corresponding bodies in the different countries - safety authorities, research institutions, electricity producers, etc. In addition, a ''vertical'' co-ordination between these different circles is accomplished through a Nordic Liaison Committee. The experience shows that valuable results can be obtained, mainly through rationalization and improved use of resources. Difficulties, which are inherent in international co-operation, can be reduced, provided that there is a strong political will, an efficient system to promote contacts, and a flexible financing scheme. Apart from the benefits obtained in each of the countries - whether or not it has its own nuclear power - particular advantages accrue when a ''Nordic group'' can present co-ordinated viewpoints on the international scene. (author)

  13. The impact of midlife educational, work, health and family experiences on men's early retirement

    NARCIS (Netherlands)

    Damman, M.; Henkens, C.J.I.M.; Kalmijn, M.

    2011-01-01

    Objectives. In empirical studies on predictors of retirement, midlife experiences have often remained implicit or been neglected. This study aims to improve our understanding of retirement by examining the impact of midlife educational, work, health, and family experiences on early retirement

  14. Early adverse experience and substance addiction: dopamine, oxytocin, and glucocorticoid pathways

    Science.gov (United States)

    Kim, Sohye; Kwok, Stephanie; Mayes, Linda C.; Potenza, Marc N.; Rutherford, Helena J. V.; Strathearn, Lane

    2016-01-01

    Substance addiction may follow a chronic, relapsing course and critically undermine the physical and psychological well-being of the affected individual and the social units of which the individual is a member. Despite the public health burden associated with substance addiction, treatment options remain suboptimal, with relapses often seen. The present review synthesizes growing insights from animal and human research to shed light upon developmental and neurobiological pathways that may increase susceptibility to addiction. We examine the dopamine system, the oxytocin system, and the glucocorticoid system, as they are particularly relevant to substance addiction. Our aim is to delineate how early adverse experience may induce long-lasting alterations in each of these systems at molecular, neuroendocrine, and behavioral levels and ultimately lead to heightened vulnerability to substance addiction. We further discuss how substance addiction in adulthood may increase the risk of suboptimal caregiving for the next generation, perpetuating the intergenerational cycle of early adverse experiences and addiction. PMID:27508337

  15. Impact of operating experience on design of civil structures - An overview

    Energy Technology Data Exchange (ETDEWEB)

    Tang, J H.K. [Ontario Hydro, Toronto, ON (Canada)

    1991-04-01

    During the past twenty years, Ontario Hydro has expanded its nuclear power to provide about one third of the electricity used in the province (coal and water powered stations provide the other two thirds). By 1992, the total installed capacity of nuclear generating stations in Ontario will further rise to over 14,000 MW. In common with other power plant design, the layout and structural design of civil facilities for a nuclear generating station are developed from consideration of functional, safety and operational requirements, as well as from past operating experience. Experience on structural performance in the sixteen units of Pickering and Bruce NGS's includes: piping and machinery vibrations, structural fatigue failures, and structural integrity due to extreme loadings not considered in the original design. The operating experience of Ontario Hydro's nuclear stations also indicates that civil structures are subjected to some degree of corrosion or degradation of certain elements similar to other mechanical components in a power station. This category of problems consists of concerns associated with thermal effects on concrete structures due to inoperative cooling system, cracking of concrete, and reliability of elastomeric seal materials at expansion joints of the containment envelop. This paper presents an overview of the operating problems and issues regarding changes in the licensing requirements related to civil structures and supporting systems of major mechanical components. The impact of these generic experience on the design of retrofits and new generating stations is also described in the paper.

  16. Impact of operating experience on design of civil structures - An overview

    International Nuclear Information System (INIS)

    Tang, J.H.K.

    1991-01-01

    During the past twenty years, Ontario Hydro has expanded its nuclear power to provide about one third of the electricity used in the province (coal and water powered stations provide the other two thirds). By 1992, the total installed capacity of nuclear generating stations in Ontario will further rise to over 14,000 MW. In common with other power plant design, the layout and structural design of civil facilities for a nuclear generating station are developed from consideration of functional, safety and operational requirements, as well as from past operating experience. Experience on structural performance in the sixteen units of Pickering and Bruce NGS's includes: piping and machinery vibrations, structural fatigue failures, and structural integrity due to extreme loadings not considered in the original design. The operating experience of Ontario Hydro's nuclear stations also indicates that civil structures are subjected to some degree of corrosion or degradation of certain elements similar to other mechanical components in a power station. This category of problems consists of concerns associated with thermal effects on concrete structures due to inoperative cooling system, cracking of concrete, and reliability of elastomeric seal materials at expansion joints of the containment envelop. This paper presents an overview of the operating problems and issues regarding changes in the licensing requirements related to civil structures and supporting systems of major mechanical components. The impact of these generic experience on the design of retrofits and new generating stations is also described in the paper

  17. Early Activation of Children Operated on under Extracorporeal Circulation

    Directory of Open Access Journals (Sweden)

    P. R. Dudov

    2008-01-01

    Full Text Available Objective: to study the safety and clinical and economic efficiency of early activation of children operated on under extracorporeal circulation (EC. Subjects and methods. Sixty-eight children aged 4—14 years (8.6±0.4 years operated on under EC for congenital heart diseases (CHD were examined. In accordance with the time of switching to spontaneous respiration and tracheal extubation, 2 groups were identified: 1 those who received postoperative artificial ventilation (AV for 2.9±0.2 hours (a study group; 2 those who had AV for 8.7±0.7 hours (a control group. Both groups did not differ in age, cardiac diseases, their severity, anthropometric characteristics, EC duration, aortic ligation time, and abnormality pattern. In the study group, anesthesia was maintained with fentanyl (5.3±0.1 ^g/kg/hr, diazepam (0.15±0.01 mg/kg/hr, and inhaled ftorotan or enflurane. Diazepam was discontinued in the postperfusion period. The control group received fentanyl (7.6±0.4 ^Bg/kg/hr, diazepam (0.3±0.02 mg/kg/hr, droperidol (0.4±0.04 mg/kg/hr, and/or sodium oxybutyrate (81±5 mg/kg/hr. Myoplegia was provided by pancuronium or pipecuronium that was continuously infused until EC was completed in Group 1 and intermittently injected until the end of surgery in Group 2. Results. There were no indications for tracheal reintubation in both groups of patients. The early postoperative period was uncomplicated in 97.2% of the children in the study group and in 28.1% in the control group (p<0.05. The incidence of pulmonary complications was 2.8 and 46.9%, respectively (p<0.05. In the children from Groups 1 and 2, the duration of a resuscita-tive period was 44.2±1.7 and 77.3±4.9 hours, respectively (p<0.05, and that of the whole postoperative period was 12.6±0.3 and 18.0±1.1 days (p<0.05. In the study group, the total final expenditures, including the cost of anesthesia and treatment for postoperative complications, decreased by 127.5% as compared to the control

  18. Preparing beginning reading teachers: An experimental comparison of initial early literacy field experiences

    OpenAIRE

    Al Otaiba, Stephanie; Lake, Vickie E.; Greulich, Luana; Folsom, Jessica S.; Guidry, Lisa

    2012-01-01

    This randomized-control trial examined the learning of preservice teachers taking an initial Early Literacy course in an early childhood education program and of the kindergarten or first grade students they tutored in their field experience. Preservice teachers were randomly assigned to one of two tutoring programs: Book Buddies and Tutor Assisted Intensive Learning Strategies (TAILS), which provided identical meaning-focused instruction (shared book reading), but differed ...

  19. Power-Cooling-Mismatch Test Series Test PCM-7. Experiment operating specifications

    International Nuclear Information System (INIS)

    Sparks, D.T.; Smith, R.H.; Stanley, C.J.

    1979-02-01

    The experiment operating specifications for the Power-Cooling-Mismatch (PCM) Test PCM-7 to be conducted in the Power Burst Facility are described. The PCM Test Series was designed on the basis of a parametric evaluation of fuel behavior response with cladding temperature, rod internal pressure, time in film boiling, and test rod power being the variable parameters. The test matrix, defined in the PCM Experiment Requirements Document (ERD), encompasses a wide range of situations extending from pre-CHF (critical heat flux) PCMs to long duration operation in stable film boiling leading to rod failure

  20. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  1. Program of experiments for the operating phase of the Underground Research Laboratory

    International Nuclear Information System (INIS)

    Simmons, G.R.; Bilinsky, D.M.; Davison, C.C.; Gray, M.N.; Kjartanson, B.H.; Martin, C.D.; Peters, D.A.; Lang, P.A.

    1992-09-01

    The Underground Research Laboratory (URL) is one of the major research and development facilities that AECL Research has constructed in support of the Canadian Nuclear Fuel Waste Management Program. The URL is a unique geotechnical research facility constructed in previously undisturbed plutonic rock, which was well characterized before construction. The site evaluation and construction phases of the URL project have been completed and the operating phase is beginning. A program of operating phase experiments that address AECL's objectives for in situ testing has been selected. These experiments were subjected to an external peer review and a subsequent review by the URL Experiment Committee in 1989. The comments from the external peer review were incorporated into the experiment plans, and the revised experiments were accepted by the URL Experiment Committee. Summaries of both reviews are presented. The schedule for implementing the experiments and the quality assurance to be applied during implementation are also summarized. (Author) (9 refs., 11 figs.)

  2. Physics operating experience and fuel management of RAPS-1

    International Nuclear Information System (INIS)

    Nakra, A.N.; Purandare, H.D.; Srinivasan, K.R.; Rastogi, B.P.

    1976-01-01

    Rajasthan Atomic Power Station Unit-1 achieved criticality on August 11, 1972. Thereafter the reactor was brought to power, in November, 1972. Due to non-availability of the depleted fuel, the loading of which was necessary to obtain full power to begin with, the core was loaded with all natural uranium fuel and only 70% of the full power could be achieved. During the reactor operation for the last three years, the reactor has seen more than one effective full power year and about 1400 fresh fuel bundles have been loaded in the core. The reactor was subjected to about 150 power cycles resulting in more than 30% variation in operating power level and about 10 fuel bundles have failed. For satisfactory fuel management and refuelling decisions, a three dimensional simulator TRIVENI was developed. This was extensively tested during the start-up experiments and was found to be a satisfactory tool for day to day operation of the plant. In this paper, a brief account of analysis of the start-up experiments, approach to full power, power distortions and flux peaking, fuel management service and analysis of the failed fuel data has been given. (author)

  3. Operational experiences on the Borssele nuclear power plant using computer based surveillance and diagnostic system on-line

    International Nuclear Information System (INIS)

    Turkcan, E.; Quaadvliet, W.H.J.; Peeters, T.T.J.M.; Verhoef, J.P

    1991-06-01

    The on-line monitoring and diagnostics system of Borssele nuclear power plant (NPP), designed and established by the ECN Energy Research Foundation, has been operating continuously since 1983. The system is extended in form of multiprocessing, multi-tasking structure performing real-time monitoring, on-line reactor parameters' calculation, data-base preparation for expert systems and providing early information on possible malfunctions even in the incipient stage making alert by passive alarms. The system realized has already been operating in the course of 7 fuel cycles of the reactor starting from start-up through normal power operation. An expert system operating on the VAX work station is added to the surveillance and diagnostics system for data base management of the observed physical parameters relevant to the NPP under supervision. The paper highlights the surveillance and diagnostic modules involved, in their actual hierarchical form in use, presents theoretical considerations applied to the design of the surveillance system together with the results obtained through the 12th to 17th fuel cycles of the NPP including start-ups and shut-downs and reveals the experience thus gained by both utility and ECN through the application of the system described. (author). 19 refs.; 4 figs

  4. Human Factors Engineering (HFE) insights for advanced reactors based upon operating experience

    International Nuclear Information System (INIS)

    Higgins, J.; Nasta, K.

    1997-01-01

    The NRC Human Factors Engineering Program Review Model (HFE PRM, NUREG-0711) was developed to support a design process review for advanced reactor design certification under 10CFR52. The HFE PRM defines ten fundamental elements of a human factors engineering program. An Operating Experience Review (OER) is one of these elements. The main purpose of an OER is to identify potential safety issues from operating plant experience and ensure that they are addressed in a new design. Broad-based experience reviews have typically been performed in the past by reactor designers. For the HFE PRM the intent is to have a more focussed OER that concentrates on HFE issues or experience that would be relevant to the human-system interface (HSI) design process for new advanced reactors. This document provides a detailed list of HFE-relevant operating experience pertinent to the HSI design process for advanced nuclear power plants. This document is intended to be used by NRC reviewers as part of the HFE PRM review process in determining the completeness of an OER performed by an applicant for advanced reactor design certification. 49 refs

  5. Contributions of the European Operating Experience Feedback Project to Support Regulatory Bodies

    International Nuclear Information System (INIS)

    Heitsch, M.

    2016-01-01

    Operating Experience Feedback (OEF) is one of the ways of improving the nuclear safety of operating nuclear power plants. The EC-Clearinghouse initiative was set up in 2008 to support nuclear regulatory authorities of EU Member States, but also Technical Support Organizations, international organizations and the broader nuclear community, to enhance nuclear safety. The differing regulatory regimes in the EU member countries and a significant diversity of the nuclear power plant (NPP) designs have been a challenge in the establishment of the European Clearinghouse. The European Clearinghouse is organized as a Network operated by a Central Office located at the Institute for Energy and Transport (IET) which is part of Joint Research Centre (JRC) of the European Commission. It gathers 17 European regulatory authorities and 3 major European Technical Support organizations (TSO). The Clearinghouse aims at providing lessons learned, recommendations and best practices from operational experience of NPPs based on support and commitment from the EU nuclear regulatory authorities. One of the objectives of the European Clearinghouse is to establish European best practices for the assessment of unusual events in NPPs. The paper will present the main activities of the European Clearinghouse. These include: • Topical studies providing in-depth assessment of selected topics important for the safe operation of NPPs. Statistical tools help to identify interesting subjects for these studies; • Quarterly reports on operating experience; • Training courses in the field of root cause analysis and event investigation; • Development, maintenance and population of a database for storage of operating experience related information; • Collaboration with international organizations such as IAEA and OECD/NEA on all aspects of OEF. All activities of the Clearinghouse initiative focus on providing an added value for nuclear regulation. (author)

  6. Operating experience feedback from safety significant events at research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Shokr, A.M. [Atomic Energy Authority, Abouzabal (Egypt). Egypt Second Research Reactor; Rao, D. [Bhabha Atomic Research Centre, Mumbai (India)

    2015-05-15

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  7. Operating experience feedback from safety significant events at research reactors

    International Nuclear Information System (INIS)

    Shokr, A.M.

    2015-01-01

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  8. Operational plans for life science payloads - From experiment selection through postflight reporting

    Science.gov (United States)

    Mccollum, G. W.; Nelson, W. G.; Wells, G. W.

    1976-01-01

    Key features of operational plans developed in a study of the Space Shuttle era life science payloads program are presented. The data describes the overall acquisition, staging, and integration of payload elements, as well as program implementation methods and mission support requirements. Five configurations were selected as representative payloads: (a) carry-on laboratories - medical emphasis experiments, (b) mini-laboratories - medical/biology experiments, (c) seven-day dedicated laboratories - medical/biology experiments, (d) 30-day dedicated laboratories - Regenerative Life Support Evaluation (RLSE) with selected life science experiments, and (e) Biomedical Experiments Scientific Satellite (BESS) - extended duration primate (Type I) and small vertebrate (Type II) missions. The recommended operational methods described in the paper are compared to the fundamental data which has been developed in the life science Spacelab Mission Simulation (SMS) test series. Areas assessed include crew training, experiment development and integration, testing, data-dissemination, organization interfaces, and principal investigator working relationships.

  9. Experiment Operating Specification for the Semiscale MOD-2C feedwater and steam line break experiment series. Appendix S-FS-6 and 7

    International Nuclear Information System (INIS)

    Boucher, T.J.; Owca, W.A.

    1985-05-01

    This document is the Semiscale MOD-2C feedwater and steam line break experiment series Experiment Operating Specification Appendix for tests S-FS-6 and S-FS-7. Test S-FS-6 is the third test in the series and simulates a 100% break in a steam generator bottom feedwater line downstream of the check valve accompanied by compounding factors (such as check valve failure, loss-of-offsite power at SIS and SIS delayed until low steam generator pressure signal). The test is terminated after plant stabilization and recovery procedures including unaffected loop steam and feed, pressurizer heater operation, pressurizer auxiliary spray operation, and normal charging/letdown operation. Test S-FS-7 is the fourth test in the series and simulates a 14.3% break in a steam generator bottom feedwater line downstream of the check valve, accompanied by compounding factors. The test is terminated after plant stabilization procedures including unaffected loop steam and feed, pressurizer heater operation, and normal charging/letdown operation. The test was followed by an affected loop secondary refill after isolating the break. The Appendix contains information on the major fluid systems, initial experiment conditions, experiment boundary conditions, and sequence of experiment events. Also included is a discussion of the scaling criteria and philosophy used to develop the experiment initial and boundary conditions and system configuration

  10. Tevatron operational experiences

    International Nuclear Information System (INIS)

    Norris, B.L.; Theilacker, J.C.

    1989-02-01

    Fermilabs superconducting accelerator, the Tevatron has been operational for nearly six years. The history of its operation is presented. Several long shutdowns for superconducting dipole repairs are discussed. The dominant factor influencing the repair was conductor motion which fatigued the cable in the magnet ends. Borescoping and x-raying techniques were used to determine which magnet ends required repair. Detailed downtime logs were kept for each of the running periods. A discussion of the sources of downtime and a comparison for different operating modes is presented

  11. Operational Experience with the ATLAS Pixel Detector

    CERN Document Server

    Djama, Fares; The ATLAS collaboration

    2017-01-01

    Run 2 of the LHC collider sets new challenges to track and vertex reconstruction because of its higher energy, pileup and luminosity. The ATLAS tracking performance relies critically on the Pixel Detector. Therefore, in view of Run 2, the ATLAS collaboration has constructed the first 4-layer pixel detector in Particle Physics by installing a new pixel layer, called Insertable B-Layer (IBL). Operational experience and performance of the 4-layer Pixel Detector during Run 2 are presented.

  12. Exploitation of the in-seam miner and operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, W I.S.; Morris, A H

    1977-12-01

    The In-seam Miner started as an investigatory project at MRDE in 1969. Since that time it has passed through the classic development stages of design of prototype, surface trials, underground trials, modification, production of more machines, assessment of experience and then wider exploitation. At the present time well over 100 machines have been supplied to the National Coal Board. The original machine was hydraulically driven and all but five of the machines supplied to date are of this type. The variety of applications that the machine has found in the mining industry has caused derivative development to embrace machines of length varying from 12-ft centers to 44-ft centers, to work in seams ranging from 40 in. up to 68 in. The range of applications has included face drivages, stablehole operations, in-seam retreat roadways and dirt-absorbing headings. Five electrically driven machines are now coming onto the market and experience with them, though limited, is very encouraging. The paper concentrates on two major aspects of the overall development process: first, the management of exploitation; and second, some operational experience of the In-seam Miner in South Midlands area.

  13. Does early-life family income influence later dental pain experience? A prospective 14-year study.

    Science.gov (United States)

    Ghorbani, Z; Peres, M A; Liu, P; Mejia, G C; Armfield, J M; Peres, K G

    2017-12-01

    The aim of this study was to investigate the association between early-life family income and dental pain experience from childhood to early adulthood. Data came from a 14-year prospective study (1991/1992-2005/2006) carried out in South Australia, which included children and adolescents aged 4-17 years (N = 9875) at baseline. The outcome was dental pain experience obtained at baseline, 14 years later in adulthood and at a middle point of time. The main explanatory variable was early-life family income collected at baseline. The prevalence of dental pain was 22.8% at baseline, 19.3% at 'middle time' and 39.3% at follow up. The proportion of people classified as 'poor' at baseline was 27.7%. Being poor early in life was significantly associated with dental pain at 14-year follow up (odds ratio = 1.45; 95% confidence interval = 1.27-1.66). Early-life relative poverty is associated with more frequent dental pain across the 14-year follow up and may be a key exposure variable for later dental conditions. © 2017 Australian Dental Association.

  14. Recent experience of Almaraz NPP in operator training

    International Nuclear Information System (INIS)

    Sanchez Cabanero, J.G.; Gomez de la Torre, J.M.

    1994-01-01

    In recent years the nuclear industry has been paying special attention to boosting nuclear power plant operation. To this end, it has optimized its maintenance, engineering, safety, management and other systems, using the appropriate resources to achieve its target. Optimization of these systems required the allocation of new resources for training plant personnel. The activity of training, which hitherto dedicated most of its attention and resources to the operating area, now extends them to schooling required in other areas of the plant, with the aim of updating the skills and knowledge of personnel to deal with new needs which have arisen. Regulations at present cover the training and qualification of only personnel responsible for handling reactor or for directing plant operation activities and capable of evaluating the nature and magnitude of possible incidents, especially those causing radioactive emissions, and of personnel requiring knowledge and experience to guarantee effective protection of individuals, ie, operators, supervisors, and qualified radiological protection experts. However, it should be borne in mind that, in the future, the training of other plant personnel could also be subject to regulations. (Author)

  15. Operating Experiences of a Loss of Voltage Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun-Chan [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2015-10-15

    Loss of voltage (LOV) events continue to occur due to inadequate work management and random human errors. On February 26, 2015, regulators analyzed the root causes of LOV events and presented the results for the nuclear industry. Currently, KHNP uses a risk monitoring program, which is named 'LOV Monitor', for LOV prevention during pilot plant outages. This review introduces the operation experiences of LOV Monitor based on the evaluation results of a real event. The operation experiences of LOV Monitor in the pilot plants confirmed that this program could detect and reduce LOV possibilities from scheduling errors such as the simultaneous maintenance of energized trains and de-energized trains considering the physical conditions of the power circuit breakers. However, a maintenance culture that heeds the risk monitoring result must be strengthened in order to obtain substantial effects through applying LOV Monitor to the outage.

  16. Vitrification operational experiences and lessons learned at the WVDP

    International Nuclear Information System (INIS)

    Hamel, W.F. Jr.; Sheridan, M.J.; Valenti, P.J.

    1997-01-01

    The Vitrification Facility (VF) at the West Valley Demonstration Project (WVDP) commenced full, high-level radioactive waste (HLW) processing activities in July 1996. The HLW consists of a blend of washed plutonium-uranium extraction (PUREX) sludge, neutralized thorium extraction (THOREX) waste, and cesium-loaded zeolite. The waste product is borosilicate glass contained in stainless steel canisters, sealed for eventual disposal in a federal repository. This paper discusses the WVDP vitrification process, focusing on operational experience and lessons learned during the first year of continuous, remote operation

  17. Best Practices in the Management of an Operating Experience Programme at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2010-08-01

    The IAEA Fundamental Safety Principles (IAEA Safety Standards Series No. SF-1) state the need for operating organizations to establish a programme for the feedback and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to the relevant national and international organizations and corrective actions are effectively implemented. In IAEA Operational Safety Review Team (OSART) and Peer Review of the effectiveness of the Operational Safety Performance Experience Review (PROSPER) missions, weaknesses in the management of operating experience (OE) programmes have been identified as one of the root causes of the recurrence of events. This publication has been developed to provide advice and assistance to nuclear installation managers and related institutions, including contractors and support organizations, to strengthen and enhance the management of their OE processes. In this publication, a number of barriers to the successful management of an OE programme have been identified. Managers are encouraged to review and evaluate these barriers with a view to identifying and eliminating them within their own organizations

  18. Operating experience of a sodium rig following the ingress of oil

    Energy Technology Data Exchange (ETDEWEB)

    Bell, A C; Mehew, R D; Robertson, C M [UKAEA, Dounreay, Thurso, Caithness, Scotland (United Kingdom)

    1980-05-01

    The experience of operating the Small Water Leak Rig at Dounreay in the two years following the ingress into the sodium of silicone oil from the pump is reported. The carbon penetration into the rig pipework has been monitored and has been found to agree with a diffusion model. The predictions based on this model have enabled an operating strategy to be determined to allow continued operation of the rig. (author)

  19. Operating experience of a sodium rig following the ingress of oil

    International Nuclear Information System (INIS)

    Bell, A.C.; Mehew, R.D.; Robertson, C.M.

    1980-01-01

    The experience of operating the Small Water Leak Rig at Dounreay in the two years following the ingress into the sodium of silicone oil from the pump is reported. The carbon penetration into the rig pipework has been monitored and has been found to agree with a diffusion model. The predictions based on this model have enabled an operating strategy to be determined to allow continued operation of the rig. (author)

  20. Selection of operations staff, qualifications and experience

    International Nuclear Information System (INIS)

    Gutmann, H.

    1977-01-01

    Requirements and suggestions have been made by authorities and various organisations in a number of countries which define necessary experience and training for the various groups of nuclear power plant personnel. For two countries, the USA and the FRG, a comparison has been made which shows that there is only a slight deviation, taking into account the different education systems. With the example of the Biblis nuclear power plant the training on the job is described. Especially the production or operation department is looked at in more detail. The training is split up into several parts: a general part, such as nuclear physics, reactor physics and engineering, reactor safety, radiation protection and so on and a plant related part, such as arrangement and mode of operation of the plant under normal and accident conditions, license conditions and so on. (orig.) [de

  1. The effects of risk perception and flight experience on airline pilots' locus of control with regard to safety operation behaviors.

    Science.gov (United States)

    You, Xuqun; Ji, Ming; Han, Haiyan

    2013-08-01

    The primary objective of this paper was to integrate two research traditions, social cognition approach and individual state approach, and to understand the relationships between locus of control (LOC), risk perception, flight time, and safety operation behavior (SOB) among Chinese airline pilots. The study sample consisted of 193 commercial airline pilots from China Southern Airlines Ltd. The results showed that internal locus of control directly affected pilot safety operation behavior. Risk perception seemed to mediate the relationship between locus of control and safety operation behaviors, and total flight time moderated internal locus of control. Thus, locus of control primarily influences safety operation behavior indirectly by affecting risk perception. The total effect of internal locus of control on safety behaviors is larger than that of external locus of control. Furthermore, the safety benefit of flight experience is more pronounced among pilots with high internal loci of control in the early and middle flight building stages. Practical implications for aviation safety and directions for future research are also discussed. Copyright © 2013 Elsevier Ltd. All rights reserved.

  2. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  3. Use of experience for the improvement of technical specifications for operation

    International Nuclear Information System (INIS)

    Schweitz, J.P.; Seveon, J.J.

    1987-11-01

    The lessons drawn from experience led EdF to define in 1980 a national specification standard, to be applied to the first standardized series of 900 MWe units and to be adapted to the later 1300 MWe units. This document is periodically revised, every two years or so, to take into account new trends in safety thinking and lessons learnt from operating experience. In this paper we present the main developments in the field of technical specifications, particularly: the definition of rules applicable in the event of unavailability of safety-related equipment, the integration of plant unit operating feedback for specifications optimization

  4. Operating experiences since rise-to-power test in high temperature engineering test reactor (HTTR)

    International Nuclear Information System (INIS)

    Tochio, Daisuke; Watanabe, Shuji; Motegi, Toshihiro; Kawano, Shuichi; Kameyama, Yasuhiko; Sekita, Kenji; Kawasaki, Kozo

    2007-03-01

    The rise-to-power test of the High Temperature Engineering Test Reactor (HTTR) was actually started in April 2000. The rated thermal power of 30MW and the rated reactor outlet coolant temperature of 850degC were achieved in the middle of Dec. 2001. After that, the reactor thermal power of 30MW and the reactor outlet coolant temperature of 950degC were achieved in the final rise-to-power test in April 2004. After receiving the operation licensing at 850degC, the safety demonstration tests have conducted to demonstrate inherent safety features of the HTGRs as well as to obtain the core and plant transient data for validation of safety analysis codes and for establishment of safety design and evaluation technologies. This paper summarizes the HTTR operating experiences for six years from start of the rise-to-power test that are categorized into (1) Operating experiences related to advanced gas-cooled reactor design, (2) Operating experiences for improvement of the performance, (3) Operating experiences due to fail of system and components. (author)

  5. Operating experience with BWR nuclear power

    International Nuclear Information System (INIS)

    Bonsdorf, Magnus von.

    1986-01-01

    The two-unit nuclear power station in Olkiluoto on the western coast of Finland produces about 20 per cent of the electricity consumption of the country. The first unit, TVO-I was first connected to the national grid in September 1978 and TVO-II in February 1980. The original rated power output of each unit was 660 MWe, corresponding to the thermal power of 2000 MW from the reactor. Technical modifications allowed the power to be uprated by 8%. The operating statistics (load factors etc.) are given and the outage experience discussed. The radiological history shows very low radioactivity and dose levels have been maintained at the plant. (UK)

  6. The Influence of Early Life Experience on Visceral Pain

    Directory of Open Access Journals (Sweden)

    Isabella M. Fuentes

    2018-01-01

    Full Text Available Pain is the most reported and troublesome symptom of nearly all functional disorders affecting the genitourinary and gastrointestinal organs. Patients with irritable bowel syndrome (IBS, interstitial cystitis/painful bladder syndrome (IC/PBS, vulvodynia, and/or chronic prostatitis/chronic pelvic pain syndrome (CP/CPPS; collectively termed chronic pelvic pain syndromes report pain severe enough to impact quality of life and often suffer from symptoms of or are diagnosed with more than one of these syndromes. This increased comorbidity between chronic pelvic pain syndromes, and with pain disorders of disparate body regions, as well as with mood disorders, can be influenced by disruptions in the hypothalamic-pituitary-adrenal (HPA axis, which regulates the response to stress and influences the perception of pain. Experiencing trauma, neglect, or abuse in early life can permanently affect the functioning of the HPA axis. As such, a significant proportion of patients suffering from comorbid chronic pelvic pain syndromes report a history of early life stress or trauma. Here we will report on how these early life experiences influence chronic pelvic pain in patients. We will also discuss various rodent models that have been developed to study this phenomenon to understand the mechanisms underlying HPA axis dysfunction, as well as potential underlying mechanisms connecting these syndromes to one another.

  7. Procedure for following external nuclear power plant operating experience

    International Nuclear Information System (INIS)

    Kostadinov, V.

    2003-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed computer database and the procedure for following-up and investigating external nuclear operating experience and administrative requirements. The SNSA's primary goal is to investigate safety significant events in due time, to analyze them from the regulatory point of view and to ensure that meaningful lessons be learned and used for improvement of the safe operation of Slovenian Nuclear Power Plant Krsko. Moreover, we intend to make uniform format and method for reporting broader spectrum of events analyzed including low level event reporting. (author)

  8. Mentalization mediates the relation between early traumatic experiences and aggressive behavior in adolescence

    OpenAIRE

    Taubner Svenja; Curth Christian

    2013-01-01

    The aim of the study was to examine whether mentalization serves as a protective factor against aggressive behavior in adolescence in the context of early traumatization. We present data from a non-clinical sample of adolescents from Germany (n=97) and calculate a mediation model to test the link between early traumatic experiences and aggressive behavior with mentalizing skills as a mediator. Mentalization was assessed with the Reflective Functioning Scale on the Adult-Attachment-Inter...

  9. The safeguards on-site laboratory at Sellafield. Five years operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Duinslaeger, L.; Belle, P. van; Mayer, K.; Casteleyn, K.; Abousahl, S.; Daures, P.; Eberle, H.; Enright, T.; Guiot, A.; Hild, M.; Horta Domenech, J.; Lajarge, P.; Laurent, P.; Le Terrier, A.; Lynch, B.; Marucci, M.; Millet, S.; Ottmar, H.; Richir, P.; Street, S.; Vallet, P.; Zuleger, E. [European Commission, Karlsruhe (Germany). Inst. for Transuranium Elements

    2004-06-01

    The start of operation of the large reprocessing facilities led Euratom Safeguards to a new approach for verification analysis of samples taken at the facility: the installation of on-site laboratories. The availability of analytical capabilities for independent verification measurements at the site of these facilities offers obvious advantages in view of timeliness of results. The 'On-Site Laboratory' (OSL) at the BNFL Sellafield site was the first ever and entered into operation in 1999. For almost five years, the Institute for Transuranium Elements (ITU) has been operating the laboratory under routine conditions. During this period, more than one thousand safeguards samples were analysed. The experience gained in the management, logistics and operation of the OSL allow a critical review based on a significant period in time. This includes also aspects of training of staff, maintenance of equipment, flow of information, and improvements in the efficiency. The analytical issues are of key importance: based on the operational experience, the measurement methods were adapted (changing boundary conditions), the distribution of samples according to material type changed (start up of MOS fabrication plant), and the cutback in resources triggered a further streamlining of the analytical efforts. (orig.)

  10. Wet steam turbines for nuclear generating stations -design and operating experience

    International Nuclear Information System (INIS)

    Usher, J.

    1977-01-01

    Lecture to the Institution of Nuclear Engineers, 11 Jan. 1977. The object of this lecture was to give an account of some design features of large wet steam turbines and to show by describing some recent operational experience how their design concepts were fulfilled. Headings are as follows: effects of wet steam cycle on turbine layout and operation (H.P. turbine, L.P. turbine); turbine control and operation; water separators; and steam reheaters. (U.K.)

  11. Earth-covered storage of LPG - Development, construction and operating experiences

    International Nuclear Information System (INIS)

    Schuldt, P.; Grote, G.

    1990-01-01

    The paper describes the planning, approval procedures, design, fabrication, site-assembling and the testing of liquefied petroleum gas storage tanks. The practical experience after three years of operation is reported. 8 figs

  12. Experience gained in enhancing operational safety at ComEd's nuclear power plants

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The following aspects of experience gained in enhancing operational safety at Comed's nuclear power plants are discussed: nuclear safety policy; centralization/decentralization; typical nuclear operating organization; safety review boards; human performance enhancement; elements of effective nuclear oversight

  13. Machine utilisation and operation experience with Jet from 1983

    International Nuclear Information System (INIS)

    Green, B.J.; Chuilon, P.; Noble, B.; Saunders, R.; Webberley, D.

    1989-01-01

    The operation of JET commenced in June 1983 and is scheduled until the end of 1992. This seemingly long period is actually quite limited when compared with the time needed to implement and commission the planned machine enhancements, and pursue research and developments which result from the experiments. There is an ever-present urgency to make the best use of the machine. 1983-84 was a learning period and only in 1985 was it felt worthwhile to adopt double-shift day working. Data has been compiled and analysed for utilisation of the machine, delays in terms of time lost and systems involved, and number and frequency of machine pulses. This paper presents an overall picture of machine availability and utilisation. It describes the JET operational arrangements and the experience of system faults. Finally, it draws conclusions and identifies lessons learned which may be relevant to the next stage of fusion power development

  14. Machine utilisation and operation experience with JET from 1983

    International Nuclear Information System (INIS)

    Green, B.J.; Chuilon, P.; Noble, B.; Saunders, R.; Webberley, D.

    1989-01-01

    The operation of JET commenced in June 1983 and is scheduled until the end of 1992. This seemingly long period is actually quite limited when compared with the time needed to implement and commission the planned machine enhancements, and pursue research and developments which result from the experiments. There is an ever-present urgency to make the use of the machine. 1983-84 was a learning period and only in 1985 was it felt worthwhile to adopt double-shift day working. Data has been compiled and analysed for utilisation of the machine, delays in terms of time lost and system involved, and number and frequency of machine pulses. This paper presents an overall picture of machine availability and utilisation. It describes the JET operational arrangements and the experience of system faults. Finally, it draws conclusions and identifies lessons learned which may be relevant to the next stage of fusion power development. (author). 9 figs

  15. Experience building and operating the CMS Tier-1 computing centres

    Science.gov (United States)

    Albert, M.; Bakken, J.; Bonacorsi, D.; Brew, C.; Charlot, C.; Huang, Chih-Hao; Colling, D.; Dumitrescu, C.; Fagan, D.; Fassi, F.; Fisk, I.; Flix, J.; Giacchetti, L.; Gomez-Ceballos, G.; Gowdy, S.; Grandi, C.; Gutsche, O.; Hahn, K.; Holzman, B.; Jackson, J.; Kreuzer, P.; Kuo, C. M.; Mason, D.; Pukhaeva, N.; Qin, G.; Quast, G.; Rossman, P.; Sartirana, A.; Scheurer, A.; Schott, G.; Shih, J.; Tader, P.; Thompson, R.; Tiradani, A.; Trunov, A.

    2010-04-01

    The CMS Collaboration relies on 7 globally distributed Tier-1 computing centres located at large universities and national laboratories for a second custodial copy of the CMS RAW data and primary copy of the simulated data, data serving capacity to Tier-2 centres for analysis, and the bulk of the reprocessing and event selection capacity in the experiment. The Tier-1 sites have a challenging role in CMS because they are expected to ingest and archive data from both CERN and regional Tier-2 centres, while they export data to a global mesh of Tier-2s at rates comparable to the raw export data rate from CERN. The combined capacity of the Tier-1 centres is more than twice the resources located at CERN and efficiently utilizing this large distributed resources represents a challenge. In this article we will discuss the experience building, operating, and utilizing the CMS Tier-1 computing centres. We will summarize the facility challenges at the Tier-1s including the stable operations of CMS services, the ability to scale to large numbers of processing requests and large volumes of data, and the ability to provide custodial storage and high performance data serving. We will also present the operations experience utilizing the distributed Tier-1 centres from a distance: transferring data, submitting data serving requests, and submitting batch processing requests.

  16. Experience building and operating the CMS Tier-1 computing centres

    International Nuclear Information System (INIS)

    Albert, M; Bakken, J; Huang, Chih-Hao; Dumitrescu, C; Fagan, D; Fisk, I; Giacchetti, L; Gutsche, O; Holzman, B; Bonacorsi, D; Grandi, C; Brew, C; Jackson, J; Charlot, C; Colling, D; Fassi, F; Flix, J; Gomez-Ceballos, G; Hahn, K; Gowdy, S

    2010-01-01

    The CMS Collaboration relies on 7 globally distributed Tier-1 computing centres located at large universities and national laboratories for a second custodial copy of the CMS RAW data and primary copy of the simulated data, data serving capacity to Tier-2 centres for analysis, and the bulk of the reprocessing and event selection capacity in the experiment. The Tier-1 sites have a challenging role in CMS because they are expected to ingest and archive data from both CERN and regional Tier-2 centres, while they export data to a global mesh of Tier-2s at rates comparable to the raw export data rate from CERN. The combined capacity of the Tier-1 centres is more than twice the resources located at CERN and efficiently utilizing this large distributed resources represents a challenge. In this article we will discuss the experience building, operating, and utilizing the CMS Tier-1 computing centres. We will summarize the facility challenges at the Tier-1s including the stable operations of CMS services, the ability to scale to large numbers of processing requests and large volumes of data, and the ability to provide custodial storage and high performance data serving. We will also present the operations experience utilizing the distributed Tier-1 centres from a distance: transferring data, submitting data serving requests, and submitting batch processing requests.

  17. Early breastfeeding experiences of adolescent mothers: a qualitative prospective study

    Directory of Open Access Journals (Sweden)

    Smith Paige Hall

    2012-09-01

    Full Text Available Abstract Background Teen mothers face many challenges to successful breastfeeding and are less likely to breastfeed than any other population group in the U.S. Few studies have investigated this population; all prior studies are cross-sectional and collect breastfeeding data retrospectively. The purpose of our qualitative prospective study was to understand the factors that contribute to the breastfeeding decisions and practices of teen mothers. Methods This prospective study took place from January through December 2009 in Greensboro, North Carolina in the U.S. We followed the cohort from pregnancy until two weeks after they ceased all breastfeeding and milk expression. We conducted semi-structured interviews at baseline and follow-up, and tracked infant feeding weekly by phone. We analyzed the data to create individual life and breastfeeding journeys and then identified themes that cut across the individual journeys. Results Four of the five teenagers breastfed at the breast for nine days: in contrast, one teen breastfed exclusively for five months. Milk expression by pumping was associated with significantly longer provision of human milk. Breastfeeding practices and cessation were closely connected with their experiences as new mothers in the context of ongoing multiple roles, complex living situations, youth and dependency, and poor knowledge of the fundamentals of breastfeeding and infant development. Breastfeeding cessation was influenced by inadequate breastfeeding skill, physically unpleasant and painful early experiences they were unprepared to manage, and inadequate health care response to real problems. Conclusions Continued breastfeeding depends on a complex interplay of multiple factors, including having made an informed choice and having the skills, support and experiences needed to sustain the belief that breastfeeding is the best choice for them and their baby given their life situation. Teenagers in the US context need to have

  18. Negative body experience in women with early childhood trauma : Associations with trauma severity and dissociation

    NARCIS (Netherlands)

    Scheffers, Wilhelmina; Hoek, Maike; Bosscher, Ruud J.; van Duijn, Marijtje A. J.; Schoevers, Robert A.; van Busschbach, Jooske T.

    2017-01-01

    Background:A crucial but often overlooked impact of early life exposure to trauma is its farreaching effect on a person's relationship with their body. Several domains of body experience may be negatively influenced or damaged as a result of early childhood trauma. Objective: The aim of this study

  19. Operation experiences with a 30 kV/100 MVA high temperature superconducting cable system

    International Nuclear Information System (INIS)

    Toennesen, Ole; Daeumling, Manfred; Jensen, Kim H; Kvorning, Svend; Olsen, Soeren K; Traeholt, Chresten; Veje, Erling; Willen, Dag; Oestergaard, Jacob

    2004-01-01

    A superconducting cable based on Bi-2223 tape technology has been developed, installed and operated in the public network of Copenhagen Energy in a two-year period between May 2001 and May 2003. This paper gives a brief overview of the system and analyses some of the operation experiences. The aim of this demonstration project is to gain experience with HTS cables under realistic conditions in a live distribution network. Approximately 50 000 utility customers have their electric power supplied through the HTS cable. The cable system has delivered 226 GW h of energy and reached a maximum operating current of 1157 A. The operation experiences include over-currents of 6 kA due to faults on peripheral lines, commissioning, servicing and failure responses on the cooling system, continuous 24 h, 7 day per week monitoring and performance of the alarm system. The implications of these experiences for the future applications of HTS cable systems are analysed

  20. The LHC test string first operational experience

    CERN Document Server

    Bézaguet, Alain-Arthur; Casas-Cubillos, J; Coull, L; Cruikshank, P; Dahlerup-Petersen, K; Faugeras, Paul E; Flemsæter, B; Guinaudeau, H; Hagedorn, Dietrich; Hilbert, B; Krainz, G; Kos, N; Lavielle, D; Lebrun, P; Leo, G; Mathewson, A G; Missiaen, D; Momal, F; Parma, Vittorio; Quesnel, Jean Pierre; Richter, D; Riddone, G; Rijllart, A; Rodríguez-Mateos, F; Rohmig, P; Saban, R I; Schmidt, R; Serio, L; Skiadelli, M; Suraci, A; Tavian, L; Walckiers, L; Wallén, E; Van Weelderen, R; Williams, L; McInturff, A

    1996-01-01

    CERN operates the first version of the LHC Test String which consists of one quadrupole and three 10-m twin aperture dipole magnets. An experimental programme aiming at the validation of the LHC systems started in February 1995. During this programme the string has been powered 100 times 35 of which at 12.4 kA or above. The experiments have yielded a number of results some of which, like quench recovery for cryogenics, have modified the design of subsystems of LHC. Others, like controlled helium leaks in the cold bore and quench propagation bewteen magnets, have given a better understanding on the evolution of the phenomena inside a string of superconducting magnets cooled at superfluid helium temperatures. Following the experimental programme, the string will be powered up and powered down in one hour cycles as a fatigue test of the structure thus simulating 20 years of operation of LHC.

  1. Scenario development during commissioning operations on the National Spherical Torus Experiment Upgrade

    Science.gov (United States)

    Battaglia, D. J.; Boyer, M. D.; Gerhardt, S.; Mueller, D.; Myers, C. E.; Guttenfelder, W.; Menard, J. E.; Sabbagh, S. A.; Scotti, F.; Bedoya, F.; Bell, R. E.; Berkery, J. W.; Diallo, A.; Ferraro, N.; Kaye, S. M.; Jaworski, M. A.; LeBlanc, B. P.; Ono, M.; Park, J.-K.; Podesta, M.; Raman, R.; Soukhanovskii, V.; NSTX-U Research, the; Operations; Engineering Team

    2018-04-01

    The National Spherical Torus Experiment Upgrade (NSTX-U) will advance the physics basis required for achieving steady-state, high-beta, and high-confinement conditions in a tokamak by accessing high toroidal fields (1 T) and plasma currents (1.0-2.0 MA) in a low aspect ratio geometry (A  =  1.6-1.8) with flexible auxiliary heating systems (12 MW NBI, 6 MW HHFW). This paper describes the progress in the development of L- and H-mode discharge scenarios and the commissioning of operational tools in the first ten weeks of operation that enable the scientific mission of NSTX-U. Vacuum field calculations completed prior to operations supported the rapid development and optimization of inductive breakdown at different values of ohmic solenoid current. The toroidal magnetic field (B T0  =  0.65 T) exceeded the maximum values achieved on NSTX and novel long-pulse L-mode discharges with regular sawtooth activity exceeded the longest pulses produced on NSTX (t pulse  >  1.8 s). The increased flux of the central solenoid facilitated the development of stationary L-mode discharges over a range of density and plasma current (I p). H-mode discharges achieved similar levels of stored energy, confinement (H98y,2  >  1) and stability (β N/β N-nowall  >  1) compared to NSTX discharges for I p  ⩽  1 MA. High-performance H-mode scenarios require an L-H transition early in the I p ramp-up phase in order to obtain low internal inductance (l i) throughout the discharge, which is conducive to maintaining vertical stability at high elongation (κ  >  2.2) and achieving long periods of MHD quiescent operations. The rapid progress in developing L- and H-mode scenarios in support of the scientific program was enabled by advances in real-time plasma control, efficient error field identification and correction, effective conditioning of the graphite wall and excellent diagnostic availability.

  2. Language experience enhances early cortical pitch-dependent responses

    Science.gov (United States)

    Krishnan, Ananthanarayan; Gandour, Jackson T.; Ananthakrishnan, Saradha; Vijayaraghavan, Venkatakrishnan

    2014-01-01

    Pitch processing at cortical and subcortical stages of processing is shaped by language experience. We recently demonstrated that specific components of the cortical pitch response (CPR) index the more rapidly-changing portions of the high rising Tone 2 of Mandarin Chinese, in addition to marking pitch onset and sound offset. In this study, we examine how language experience (Mandarin vs. English) shapes the processing of different temporal attributes of pitch reflected in the CPR components using stimuli representative of within-category variants of Tone 2. Results showed that the magnitude of CPR components (Na-Pb and Pb-Nb) and the correlation between these two components and pitch acceleration were stronger for the Chinese listeners compared to English listeners for stimuli that fell within the range of Tone 2 citation forms. Discriminant function analysis revealed that the Na-Pb component was more than twice as important as Pb-Nb in grouping listeners by language affiliation. In addition, a stronger stimulus-dependent, rightward asymmetry was observed for the Chinese group at the temporal, but not frontal, electrode sites. This finding may reflect selective recruitment of experience-dependent, pitch-specific mechanisms in right auditory cortex to extract more complex, time-varying pitch patterns. Taken together, these findings suggest that long-term language experience shapes early sensory level processing of pitch in the auditory cortex, and that the sensitivity of the CPR may vary depending on the relative linguistic importance of specific temporal attributes of dynamic pitch. PMID:25506127

  3. Magnesio-thermic reduction of UF4 to uranium metal : plant operating experience

    International Nuclear Information System (INIS)

    Mayekar, S.V.; Singh, H.; Meghal, A.M.; Koppiker, K.S.

    1991-01-01

    Uranium Metal Plant has switched over from calcio-thermy to magnesio-thermy for production of uranium ingots. In this paper, the plant operating experience for magnesio-thermic reduction is described. Based on trials, the production has been stepped up from 40 kg ingots to 200 kg ingots. The operating parameters optimised include : heating schedule, UF 4 quality, magnesium quantity and quality, and particle size. The effect of quality of refractory lining has been discussed. Conditions for lining are optimised with regard to type of material used and size. Developmental work has also been carried out on use of pelletised charge and on use of graphite sleeves. Some experience in the machining of ingots for removal of surface slag is also discussed. Impurity problems, occasionally encountered, have been investigated and results are discussed. Based on the experience gained, specifications for operation have been laid down, and areas for further improvement are identified. (author). 5 refs., 1 fig., 1 tab

  4. Early Experiences with Family Conflict: Implications for Arguments with a Close Friend.

    Science.gov (United States)

    Herrera, Carla; Dunn, Judy

    1997-01-01

    Examined associations between children's early experiences in family disputes and later conflict management with close friends. Found that argument used by mothers and siblings that considered children's needs was positively associated with children's later constructive argument and resolution techniques. Mothers' use of argument predicted…

  5. Operating experience with aluminum bearings at the Portsmouth Gaseous Diffusion Plant

    International Nuclear Information System (INIS)

    Langebrake, C.O.

    1975-01-01

    Considerable operating experience has been gained at the Portsmouth Gaseous Diffusion Plant over the last 15 years in the use of aluminum bearings in process related and auxiliary equipment. All of this experience has been excellent and, in several cases, the use of this type of bearing material has solved significant operating problems. Aluminum 850-T101 alloy was first used as a bearing material in purge cascade (PC-9) centrifugal compressors where a fatigue problem was being experienced with babbitt-type bearings. Good experience in this application led to the extended use of this bearing material in other equipment including process related as well as auxiliary equipment. Since 1961 aluminum bearings have been installed in approximately 21 Type PC-9 (centrifugal), 97 Type 9 (centrifugal), 262 Type X-29 (axial), and 101 Type 31 (axial) compressors, and 3 speed increasers in the X-330 Evacuation Booster Station. Based on successful operation of these bearings, continued and expanded use of aluminum bearings is recommended as a means of obtaining a high fatigue resistant bearing at a cost lower than that for babbitt-type bearings. (U.S.)

  6. Early MIMD experience on the CRAY X-MP

    Science.gov (United States)

    Rhoades, Clifford E.; Stevens, K. G.

    1985-07-01

    This paper describes some early experience with converting four physics simulation programs to the CRAY X-MP, a current Multiple Instruction, Multiple Data (MIMD) computer consisting of two processors each with an architecture similar to that of the CRAY-1. As a multi-processor, the CRAY X-MP together with the high speed Solid-state Storage Device (SSD) in an ideal machine upon which to study MIMD algorithms for solving the equations of mathematical physics because it is fast enough to run real problems. The computer programs used in this study are all FORTRAN versions of original production codes. They range in sophistication from a one-dimensional numerical simulation of collisionless plasma to a two-dimensional hydrodynamics code with heat flow to a couple of three-dimensional fluid dynamics codes with varying degrees of viscous modeling. Early research with a dual processor configuration has shown speed-ups ranging from 1.55 to 1.98. It has been observed that a few simple extensions to FORTRAN allow a typical programmer to achieve a remarkable level of efficiency. These extensions involve the concept of memory local to a concurrent subprogram and memory common to all concurrent subprograms.

  7. Programmable DSP-based multi-bunch feedback--operational experience from six installations

    International Nuclear Information System (INIS)

    Fox, J.; Prabhakar, S.; Teytelman, D.; Young, A.; Stover, G.; Drago, A.; Serio, M.; Khan, S.; Knuth, T.; Kim, Y.; Park, M.

    2000-01-01

    A longitudinal instability control system, originally developed for the PEP-II, DAΦNE and ALS machines has in the last two years been commissioned for use at the PLS and BESSY-II light sources. All of the installations are running identical hardware and use a common software distribution package. This common structure is beneficial in sharing expertise among the labs, and allows rapid commissioning of each new installation based on well-understood diagnostic and operational techniques. While the installations share the common instability control system, there are significant differences in machine dynamics between the various colliders and light sources. These differences require careful specification of the feedback algorithm and system configuration at each installation to achieve good instability control and useful operational margins. This paper highlights some of the operational experience at each installation, using measurements from each facility to illustrate the challenges unique to each machine. Our experience on the opportunities and headaches of sharing development and operational expertise among labs on three continents is also offered

  8. Safety aspects and operating experience of LWR plants in Japan

    International Nuclear Information System (INIS)

    Aoki, S.; Yoshioka, T.; Toyota, M.; Hinoki, M.

    1977-01-01

    To develop nuclear power generation for the future, it is necessary to put further emphasis on safety assurance and to endeavour to devise measures to improve plant availability, based on the careful analysis of causes that reduce plant availability. The paper discusses the results of studies on the following items from such viewpoints: (1) Safety and operating experience of LWR nuclear power plants in Japan: operating experience with LWRs; improvements in LWR design during the past ten years; analysis of the factors affecting plant availability; (2) Assurance of safety and measures to increase availability: measures for safety and environmental protection; measures to reduce radiation exposure of employees; appropriateness of maintenance and inspection work; measures to increase plant availability; measures to improve reliability of equipment and components; (3) Future technical problems. (author)

  9. CMS distributed analysis infrastructure and operations: experience with the first LHC data

    International Nuclear Information System (INIS)

    Vaandering, E W

    2011-01-01

    The CMS distributed analysis infrastructure represents a heterogeneous pool of resources distributed across several continents. The resources are harnessed using glite and glidein-based work load management systems (WMS). We provide the operational experience of the analysis workflows using CRAB-based servers interfaced with the underlying WMS. The automatized interaction of the server with the WMS provides a successful analysis workflow. We present the operational experience as well as methods used in CMS to analyze the LHC data. The interaction with CMS Run-registry for Run and luminosity block selections via CRAB is discussed. The variations of different workflows during the LHC data-taking period and the lessons drawn from this experience are also outlined.

  10. Plant operator performance evaluation based on cognitive process analysis experiment

    International Nuclear Information System (INIS)

    Ujita, H.; Fukuda, M.

    1990-01-01

    This paper reports on an experiment to clarify plant operators' cognitive processes that has been performed, to improve the man-machine interface which supports their diagnoses and decisions. The cognitive processes under abnormal conditions were evaluated by protocol analyses interviews, etc. in the experiment using a plant training simulator. A cognitive process model is represented by a stochastic network, based on Rasmussen's decision making model. Each node of the network corresponds to an element of the cognitive process, such as observation, interpretation, execution, etc. Some observations were obtained as follows, by comparison of Monte Carlo simulation results with the experiment results: A process to reconfirm the plant parameters after execution of a task and feedback paths from this process to the observation and the task definition of next task were observed. The feedback probability average and standard deviation should be determined for each incident type to explain correctly the individual differences in the cognitive processes. The tendency for the operator's cognitive level to change from skill-based to knowledge-based via rule-based behavior was observed during the feedback process

  11. ACTEX flight experiment: development issues and lessons learned

    Science.gov (United States)

    Schubert, S. R.

    1993-09-01

    The ACTEX flight experiment is scheduled for launch and to begin its on orbit operations in early 1994. The objective of the ACTEX experiment is to demonstrate active vibration control in space, using the smart structure technology. This paper discusses primarily the hardware development and program management issues associated with delivering low cost flight experiments.

  12. Clinical Education Environment Experiences of Operating Room Students

    Directory of Open Access Journals (Sweden)

    Tahereh khazaei

    2016-01-01

    Full Text Available Background and purpose: The objective of medical education is to train competent and qualified workforce in order to provide services in various health environments. One of the important objectives of Operating Room students is to train workforce who can involve in patient’s health and recovery. Training these students should cause clinical ability and independent decision making during surgery. Since students during internship face with many problems, this study has been conducted to explore and describe the challenges and experiences.Methods: This qualitative study is a phenomenology that was conducted based on 20 students in the last semester of Operating Room associate’s degree with purposive sampling. Deep and semi-structured interviews were used to collect data and data were analyzed by content analysis method.Results: The findings in 5 main themes: (1 Physical space and equipment in the operating room, (2 The student’s position in operating room, (3 Integrating knowledge and action, (4 Managing education environment and 5- Student’s viewpoint about operating room and working in it.Conclusions: Interviews with students revealed the educational environment challenges with which they are faced during their study. Teachers can provide solutions to overcome the challenges and create a positive atmosphere for students' learning using results of this study and students may continue their interest in education and improve the quality of their education.Keywords: CLINICAL EDUCATION, OPERATING ROOM STUDENTS, CHALLENGE

  13. PROSPER guidelines: Guidelines for peer review and for plant self-assessment of operational experience feedback process

    International Nuclear Information System (INIS)

    2003-01-01

    Effective use of operational performance information is an important element in any plant operator's arrangements for enhancing the operational safety of a nuclear power plant (NPP). This has been recognized in the IAEA Safety Fundamental, The Safety of Nuclear Installations (Safety Series No. 110). Under the technical aspects of safety, one of the principles of operation and maintenance is that the operating organization and the regulatory body shall establish complementary programmes to analyse operating experience to ensure that lessons are learned and acted upon. Such experience shall be shared with relevant national and international bodies. The Convention on Nuclear Safety, which entered into force in July 1996, also recognized the importance of operational experience feedback as a tool of high importance for the safety of nuclear plant operation and its further enhancement. It follows that the arrangements and results achieved under the operation experience feedback process in Member States will be covered by the national report under the Convention and will be subject to periodical review. These principles are further expanded in the IAEA Safety Standards Safety of Nuclear Power Plants: Operation (Safety Standard Series No. NS-R-2, year 2000) under the Feedback of The IAEA-led Peer Review of the effectiveness of the Operational Safety Performance Experience Review process (PROSPER) and associated guidelines have been developed to provide advice and assistance to utilities or individual power plants to strengthen and enhance the effectiveness of operational experience programmes in achieving these fundamental objectives. The objectives of the former IAEA Assessment of Significant Safety Events Team (ASSET) service have been expanded to include an evaluation of the effective use of all operating performance information available to the plant (e.g. external operating experience, internal low-level and near miss event reports and other relevant operating

  14. EBO feed water distribution system, experience gained from operation

    Energy Technology Data Exchange (ETDEWEB)

    Matal, O. [Energovyzkum, Brno (Switzerland); Schmidt, S.; Mihalik, M. [Atomove Elektrarne Bohunice, Jaslovske Bohunice (Switzerland)

    1997-12-31

    Advanced feed water distribution systems of the EBO design have been installed into steam generators at Units 3 and 4 of the NPP Jaslovske Bohunice (VVER 440). Experiences gained from the operation of steam generators with the advanced feed water distribution systems are discussed in the paper. (orig.). 4 refs.

  15. EBO feed water distribution system, experience gained from operation

    Energy Technology Data Exchange (ETDEWEB)

    Matal, O [Energovyzkum, Brno (Switzerland); Schmidt, S; Mihalik, M [Atomove Elektrarne Bohunice, Jaslovske Bohunice (Switzerland)

    1998-12-31

    Advanced feed water distribution systems of the EBO design have been installed into steam generators at Units 3 and 4 of the NPP Jaslovske Bohunice (VVER 440). Experiences gained from the operation of steam generators with the advanced feed water distribution systems are discussed in the paper. (orig.). 4 refs.

  16. Operational Experience with a Cryogenic Axial-Centrifugal Compressor

    CERN Document Server

    Decker, L; Löhlein, K; Purtschert, W; Ziegler, B L; Lebrun, P; Tavian, L; Brunovsky, I; Tucek, L

    1998-01-01

    The Large Hadron Collider (LHC), presently under construction at CERN, requires large refrigeration capacity at 1.8 K. Compression of gaseous helium at cryogenic temperatures is therefore inevitable. Together with subcontractors, Linde Kryotechnik has developed a prototype machine. This unit is based on a cryogenic axial-centrifugal compressor, running on ceramic ball bearings and driven by a variable-frequency electrical motor operating at ambient temperature. Integrated in a test facility for superconducting magnets the machine has been commissioned without major problems and successfully gone through the acceptance test in autumn 1995. Subsequent steps were initiated to improve efficiency of this prototype. This paper describes operating experience gained so far and reports on measured performance prior to and after constructional modifications.

  17. Operational Experience with the ATLAS Pixel Detector

    CERN Document Server

    Djama, Fares; The ATLAS collaboration

    2017-01-01

    Run-2 of the LHC is providing new challenges to track and vertex reconstruction imposed by the higher collision energy, pileup and luminosity that are being delivered. The ATLAS tracking performance relies critically on the Pixel Detector, therefore, in view of Run-2 of LHC, the ATLAS experiment has constructed the first 4-layer Pixel detector in HEP, installing a new Pixel layer, also called Insertable B-Layer (IBL). Pixel detector was refurbished with a new service quarter panel to recover about 3% of defective modules lost during run-1 and an additional optical link per module was added to overcome in some layers the readout bandwidth limitation when LHC will exceed the nominal peak luminosity by almost a factor of 3. The key features and challenges met during the IBL project will be presented, as well as its operational experience and Pixel Detector performance in LHC.

  18. First experience in operating the population of the condition databases for the CMS experiment

    International Nuclear Information System (INIS)

    De Gruttola, Michele; Paolucci, Pierluigi; Di Guida, Salvatore; Glege, Frank; Innocente, Vincenzo; Schlatter, Dieter; Futyan, David; Govi, Giacomo; Pierro, Antonio

    2010-01-01

    Reliable population of the condition databases is critical for the correct operation of the online selection as well as of the offline reconstruction and analysis of data. We will describe here the system put in place in the CMS experiment to populate the database and make condition data promptly available both online for the high-level trigger and offline for reconstruction. The system, designed for high flexibility to cope with very different data sources, uses POOL-ORA technology in order to store data in an object format that best matches the object oriented paradigm for C++ programming language used in the CMS offline software. In order to ensure consistency among the various subdetectors, a dedicated package, PopCon (Populator of Condition Objects), is used to store data online. The data are then automatically streamed to the offline database hence immediately accessible offline worldwide. This mechanism was intensively used during 2008 in the test-runs with cosmic rays. The experience of this first months of operation will be discussed in detail.

  19. Glucose balance and muscle glycogen during TPN in the early post-operative phase

    DEFF Research Database (Denmark)

    Henneberg, S; Stjernström, H; Essén-Gustavsson, B

    1985-01-01

    In order to study how muscle glycogen is influenced by different nutritional regimens in the early post-operative period we took muscle biopsies from 20 patients preoperatively and on the fourth post-operative day after abdominal aortic surgery. Ten patients received 93% of non-protein energy......-production) were performed and from these data glucose balance was calculated as the difference between glucose intake and glucose expenditure. Muscle biopsies were analysed for glycogen, adenosine triphosphate, glucose-6-phosphate, lactate and citrate. We found that it was possible to maintain muscle...... glycogen stores at pre-operative levels with a glucose-insulin regimen. With the fat regimen there was a 31% decrease in muscle glycogen and two patients had a negative glucose balance despite the fact that 150 g of glucose were given. Average glucose balance throughout the study correlated positively...

  20. Design and operational experience of the NUHOMS-24P spent fuel storage system

    International Nuclear Information System (INIS)

    McConaghy, W.J.; Lehnert, R.A.; Rasmussen, R.W.

    1991-01-01

    The NUHOMS spent fuel storage system provides a safe and economical method for the dry storage of spent fuel assemblies either at an independent spent fuel storage installation (ISFSI) at reactor or at a centralized storage facility away from reactor. The system consists of three major safety-related components: a dry shielded canister (DSC) which provides a high integrity containment boundary and a controlled storage environment for the fuel; a reinforced concrete horizontal storage module (HSM) which houses the stored DSCs and provides radiation shielding, protection against natural phenomena and an efficient means for decay heat removal; and a transfer cask which provides for the safe shielded transfer of DSCs from a plant spent fuel pool to a HSM. The NUHOMS system is designed and licensed to the requirements of 10 CFR 72 and ANS/ANSI 57.9 for ISFSIs. The NUHOMS concept was developed in early 1980s, and in 1987, a larger version of the NUHOMS system, 24P, was developed. The operational features of NUHOMS and the loading experience at Oconee are reported. (K.I.)

  1. First operational experience with the LHC machine protection system when operating with beam energies beyond the 100MJ range

    CERN Document Server

    Assmann, R; Ferro-Luzzi, M; Goddard, B; Lamont, M; Schmidt, R; Siemko, A; Uythoven, J; Wenninger, J; Zerlauth, M

    2012-01-01

    The Large Hadron Collider (LHC) at CERN has made remarkable progress during 2011, surpassing its ambitious goal for the year in terms of luminosity delivered to the LHC experiments. This achievement was made possible by a progressive increase of beam intensities by more than 5 orders of magnitude during the first months of operation, reaching stored beam energies beyond the 100MJ range at the end of the year, less than a factor of 4 from the nominal design value. The correct functioning of the machine protection systems is vital during the different operational phases, for initial operation and even more when approaching nominal beam parameters where already a small fraction of the stored energy is sufficient to damage accelerator equipment or experiments in case of uncontrolled beam loss. Safe operation of the machine in presence of such high intensity proton beams is guaranteed by the interplay of many different systems: beam dumping system, beam interlocks, beam instrumentation, equipment monitoring, colli...

  2. Current operations and experiments at the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Bartlit, J.R.; Anderson, J.L.

    1985-01-01

    The Tritium Systems Test Assembly (TSTA) has continued to move toward operation of a fully-integrated, full-sized, computer-controlled fusion fuel processing loop. Concurrent, nonloop experiments have answered important questions on new components and issues such as palladium diffusion membranes, ceramic electrolysis cells, regenerable tritium getters, laser Raman spectroscopy, unregenerable tritium inventory on molecular sieves, tritium contamination problems and decontamination methods, and operating data on reliability, emissions, doses, and wastes generated. 4 refs., 2 figs

  3. Operating experiences with 1 MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Sano, A; Kanamori, A; Tsuchiya, T

    1975-07-01

    1 MW steam generator, which was planned as the first stage of steam generator development in Power Reactor and Nuclear Fuel Corp. (PNC) in Japan, is a single-unit, once-through, integrated shell and tube type with multi-helical coil tubes. It was completed in Oarai Engineering Center of PNC in March of 1971, and the various performance tests were carried out up to April, 1972. After the dismantle of the steam generator for structural inspection and material test, it was restored with some improvements. In this second 1 MW steam generator, small leak occurred twice during normal operation. After repairing the failure, the same kind of performance tests as the first steam generator were conducted in order to verify the thermal insulation effect of argon gas in downcomer zone from March to June, 1974. In this paper the above operating experiences were presented including the outline of some performance test results. (author)

  4. Operational experience with the ATLAS Pixel Detector

    CERN Document Server

    Ince, T; The ATLAS collaboration

    2012-01-01

    The ATLAS Pixel Detector is the innermost element of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this paper, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 96.2% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  5. Operational experience of the ATLAS Pixel detector

    CERN Document Server

    Hirschbuehl, D; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  6. Operational experience of the ATLAS Pixel Detector

    CERN Document Server

    Marcisovsky, M; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  7. Flight Technical Error Analysis of the SATS Higher Volume Operations Simulation and Flight Experiments

    Science.gov (United States)

    Williams, Daniel M.; Consiglio, Maria C.; Murdoch, Jennifer L.; Adams, Catherine H.

    2005-01-01

    This paper provides an analysis of Flight Technical Error (FTE) from recent SATS experiments, called the Higher Volume Operations (HVO) Simulation and Flight experiments, which NASA conducted to determine pilot acceptability of the HVO concept for normal operating conditions. Reported are FTE results from simulation and flight experiment data indicating the SATS HVO concept is viable and acceptable to low-time instrument rated pilots when compared with today s system (baseline). Described is the comparative FTE analysis of lateral, vertical, and airspeed deviations from the baseline and SATS HVO experimental flight procedures. Based on FTE analysis, all evaluation subjects, low-time instrument-rated pilots, flew the HVO procedures safely and proficiently in comparison to today s system. In all cases, the results of the flight experiment validated the results of the simulation experiment and confirm the utility of the simulation platform for comparative Human in the Loop (HITL) studies of SATS HVO and Baseline operations.

  8. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  9. Diagnostics for the National Compact Stellarator Experiment

    International Nuclear Information System (INIS)

    Stratton, B.C.; Johnson, D.; Feder, R.; Fredrickson, E.; Neilson, H.; Takahashi, H.; Zarnstorf, M.; Cole, M.; Goranson, P.; Lazarus, E.; Nelson, B.

    2003-01-01

    The status of planning of the National Compact Stellarator Experiment (NCSX) diagnostics is presented, with the emphasis on resolution of diagnostics access issues and on diagnostics required for the early phases of operation

  10. Method for simulating predictive control of building systems operation in the early stages of building design

    DEFF Research Database (Denmark)

    Petersen, Steffen; Svendsen, Svend

    2011-01-01

    A method for simulating predictive control of building systems operation in the early stages of building design is presented. The method uses building simulation based on weather forecasts to predict whether there is a future heating or cooling requirement. This information enables the thermal...... control systems of the building to respond proactively to keep the operational temperature within the thermal comfort range with the minimum use of energy. The method is implemented in an existing building simulation tool designed to inform decisions in the early stages of building design through...... parametric analysis. This enables building designers to predict the performance of the method and include it as a part of the solution space. The method furthermore facilitates the task of configuring appropriate building systems control schemes in the tool, and it eliminates time consuming manual...

  11. The operating experience and incident analysis for High Flux Engineering Test Reactor

    International Nuclear Information System (INIS)

    Zhao Guang

    1999-01-01

    The paper describes the incidents analysis for High Flux Engineering test reactor (HFETR) and introduces operating experience. Some suggestion have been made to reduce the incidents of HFETR. It is necessary to adopt new improvements which enhance the safety and reliability of operation. (author)

  12. Self-assessment on nuclear power plants operational experience feedback process

    International Nuclear Information System (INIS)

    Li Hongtao; Ding Ying

    2005-01-01

    This paper introduces the purpose and function of self-assessment conducted by the responsible organizations of nuclear power plants, and describes the methods and requirements of self-assessment on operational experience feedback process to give a example. (authors)

  13. [Operative treatment strategies for multiple trauma patients : early total care versus damage control].

    Science.gov (United States)

    Klüter, T; Lippross, S; Oestern, S; Weuster, M; Seekamp, A

    2013-09-01

    The treatment of multiple trauma patients is a great challenge for an interdisciplinary team. After preclinical care and subsequent treatment in the emergency room the order of the interventions is prioritized depending of the individual risk stratification. For planning the surgery management it is essential to distinguish between absolutely essential operations to prevent life-threatening situations for the patient and interventions with shiftable indications, depending on the general condition of the patient. All interventions need to be done without causing significant secondary damage to prohibit hyperinflammation and systemic inflammatory response syndrome. The challenge consists in determination of the appropriate treatment at the right point in time. In general the early primary intervention, early total care, is differentiated from the damage control concept.

  14. ATLAS Operations: Experience and Evolution in the Data Taking Era

    CERN Document Server

    Ueda, I; The ATLAS collaboration; Goossens, L; Stewart, G; Jezequel, S; Nairz, A; Negri, G; Campana, S; Di Girolamo, A

    2011-01-01

    This paper summarises the operational experience and improvements of the ATLAS hierarchical multi-tier computing infrastructure in the past year leading to taking and processing of the first collisions in 2009 and 2010. Special focus will be given to Tier-0 which is responsible, among other things, for a prompt processing of the raw data coming from the online DAQ system and is thus critical part of the chain. We will give an overview of the Tier-0 architecture, and improvements based on the operational experience. Emphasis will be put on the new developments, namely the Task Management System opening Tier-0 to expert users and Web 2.0 monitoring and management suite. We then overview the achieved performances with the distributed computing system, discuss observed data access patterns over the grid and describe how we used this information to improve analysis rates.

  15. Evolution of PHWR fuel transfer system based on operating experience

    International Nuclear Information System (INIS)

    Parvatikar, R.S.; Singh, Jaipal; Chaturvedi, P.C.; Bhambra, H.S.

    2006-01-01

    Fuel Transfer System facilitates loading of new fuel into Fuelling Machine, receipt of spent fuel from Fuelling Machine and its further transportation to Storage Bay. To overcome the limitations of transferring a pair of bundles in the single tube Airlock and Transfer Arm in RAPS-1 and 2/MAPS, a new concept of six tube Transfer Magazine was introduced in NAPS. This resulted in simultaneous loading of new fuel from Transfer Magazine into the Fuelling Machine and unloading of spent fuel from the Fuelling Machine through the exchange mode. It further facilitated the parallel/simultaneous operation of refuelling by Fuelling Machines on the reactor and transferring of spent fuel bundles from the Transfer Magazine to the bay. This new design of Fuel Transfer System was adopted for all standardised 220 MWe PHWRs. Based on the experience gained in 220 MWe PHWRs in the area of operation and maintenance, a number of improvements have been carried out over the years. These aspects have been further strengthened and refined in the Fuel Transfer System of 540 MWe units. The operating experience of the system indicates that the presence of heavy water in the Transfer Magazine poses limitations in its maintenance in the Fuel Transfer room. Further, Surveillance and maintenance of large number of under water equipment and associated valves, rams and underwater sensors is putting extra burden on the O and M efforts. A new concept of mobile light water filled Transfer Machine has been evolved for proposed 700 MWe PHWR units to simplify Fuel Transfer System. This has been made possible by adopting snout level control in the Fuelling Machine, elimination of Shuttle Transport System and locating the Storage Bay adjacent to the Reactor Building. This paper describes the evolution of Fuel Transfer System concepts and various improvements based on the experience gained in the operation and maintenance of the system. (author)

  16. Early visual experience and the recognition of basic facial expressions: involvement of the middle temporal and inferior frontal gyri during haptic identification by the early blind.

    Science.gov (United States)

    Kitada, Ryo; Okamoto, Yuko; Sasaki, Akihiro T; Kochiyama, Takanori; Miyahara, Motohide; Lederman, Susan J; Sadato, Norihiro

    2013-01-01

    Face perception is critical for social communication. Given its fundamental importance in the course of evolution, the innate neural mechanisms can anticipate the computations necessary for representing faces. However, the effect of visual deprivation on the formation of neural mechanisms that underlie face perception is largely unknown. We previously showed that sighted individuals can recognize basic facial expressions by haptics surprisingly well. Moreover, the inferior frontal gyrus (IFG) and posterior superior temporal sulcus (pSTS) in the sighted subjects are involved in haptic and visual recognition of facial expressions. Here, we conducted both psychophysical and functional magnetic-resonance imaging (fMRI) experiments to determine the nature of the neural representation that subserves the recognition of basic facial expressions in early blind individuals. In a psychophysical experiment, both early blind and sighted subjects haptically identified basic facial expressions at levels well above chance. In the subsequent fMRI experiment, both groups haptically identified facial expressions and shoe types (control). The sighted subjects then completed the same task visually. Within brain regions activated by the visual and haptic identification of facial expressions (relative to that of shoes) in the sighted group, corresponding haptic identification in the early blind activated regions in the inferior frontal and middle temporal gyri. These results suggest that the neural system that underlies the recognition of basic facial expressions develops supramodally even in the absence of early visual experience.

  17. Radiofrequency Ablation Treatment for Renal Cell Carcinoma: Early Clinical Experience

    Energy Technology Data Exchange (ETDEWEB)

    Park, Seong Hoon; Yoon, Seong Kuk; Cho, Jin Han; Oh, Jong Young; Nam, Kyung Jin; Kwon, Hee Jin; Kim, Su Yeon; Kang, Myong Jin; Choi, Sun Seob; Sung, Gyung Tak [Dong-A University College of Medicine, Busan (Korea, Republic of)

    2008-08-15

    To evaluate the early clinical experience associated with radiofrequency (RF) ablation in patients with renal cell carcinoma (RCC). The RF ablation treatment was performed on 17 tumors from 16 patients (mean age, 60.5 years; range, 43 73 years) with RCC. The treatment indications were localized, solid renal mass, comorbidities, high operation risk, and refusal to perform surgery. All tumors were treated by a percutaneous CT (n = 10), followed by an US-guided (n = 2), laparoscopy-assisted US (n = 2), and an open (n = 2) RF ablation. Furthermore, patients underwent a follow- up CT at one day, one week, one month, three and six months, and then every six months from the onset of treatment. We evaluated the technical success, technical effectiveness, ablation zone, benign periablation enhancement, irregular peripheral enhancement, and complications. All 17 exophytic tumors (mean size, 2.2 cm; range, 1.1 5.0 cm) were completely ablated. Technical success and effectiveness was achieved in all cases and the mean follow-up period was 23.8 months (range, 17 33 months). A local recurrence was not detected in any of the cases; however, five patients developed complications as a result of treatment, including hematuria (n = 2), mild thermal injury of the psoas muscle (n = 1), mild hydronephrosis (n = 1), and fistula formation (n = 1). The RF ablation is an alternative treatment for exophytic RCCs and represents a promising treatment for some patients with small RCCs.

  18. Radiofrequency Ablation Treatment for Renal Cell Carcinoma: Early Clinical Experience

    International Nuclear Information System (INIS)

    Park, Seong Hoon; Yoon, Seong Kuk; Cho, Jin Han; Oh, Jong Young; Nam, Kyung Jin; Kwon, Hee Jin; Kim, Su Yeon; Kang, Myong Jin; Choi, Sun Seob; Sung, Gyung Tak

    2008-01-01

    To evaluate the early clinical experience associated with radiofrequency (RF) ablation in patients with renal cell carcinoma (RCC). The RF ablation treatment was performed on 17 tumors from 16 patients (mean age, 60.5 years; range, 43 73 years) with RCC. The treatment indications were localized, solid renal mass, comorbidities, high operation risk, and refusal to perform surgery. All tumors were treated by a percutaneous CT (n = 10), followed by an US-guided (n = 2), laparoscopy-assisted US (n = 2), and an open (n = 2) RF ablation. Furthermore, patients underwent a follow- up CT at one day, one week, one month, three and six months, and then every six months from the onset of treatment. We evaluated the technical success, technical effectiveness, ablation zone, benign periablation enhancement, irregular peripheral enhancement, and complications. All 17 exophytic tumors (mean size, 2.2 cm; range, 1.1 5.0 cm) were completely ablated. Technical success and effectiveness was achieved in all cases and the mean follow-up period was 23.8 months (range, 17 33 months). A local recurrence was not detected in any of the cases; however, five patients developed complications as a result of treatment, including hematuria (n = 2), mild thermal injury of the psoas muscle (n = 1), mild hydronephrosis (n = 1), and fistula formation (n = 1). The RF ablation is an alternative treatment for exophytic RCCs and represents a promising treatment for some patients with small RCCs

  19. Children with disorders of sex development: A qualitative study of early parental experience

    Directory of Open Access Journals (Sweden)

    Crissman Halley P

    2011-10-01

    Full Text Available Abstract Background Clinical research on psychological aspects of disorders of sex development (DSD has focused on psychosexual differentiation with relatively little attention directed toward parents' experiences of early clinical management and their influence on patient and family psychosocial adaptation. Objectives To characterize parental experiences in the early clinical care of children born with DSD. Study Design Content analysis of interviews with parents (n = 41 of 28 children, newborn to 6 years, with DSD. Results Four major domains emerged as salient to parents: (1 the gender assignment process, (2 decisions regarding genital surgery, (3 disclosing information about their child's DSD, and (4 interacting with healthcare providers. Findings suggested discordance between scientific and parental understandings of the determinants of "sex" and "gender." Parents' expectations regarding the benefits of genital surgery appear largely met; however, parents still had concerns about their child's future physical, social and sexual development. Two areas experienced by many parents as particularly stressful were: (1 uncertainties regarding diagnosis and optimal management, and (2 conflicts between maintaining privacy versus disclosing the condition to access social support. Conclusions Parents' experiences and gaps in understanding can be used to inform the clinical care of patients with DSD and their families. Improving communication between parents and providers (and between parents and their support providers throughout the early clinical management process may be important in decreasing stress and improving outcomes for families of children with DSD.

  20. Reflective Processes: A Qualitative Study Exploring Early Learning Student Teacher Mentoring Experiences in Student Teaching Practicums

    Science.gov (United States)

    Barnes, Michelle M.

    2013-01-01

    This doctoral thesis explored mentoring in early learning teacher preparation programs. This study explored the reflective processes embedded in the work between student teachers and their mentors during early learning student teacher experiences at Washington State community and technical colleges. Schon's (1987a) concepts of…

  1. Operation experiences of biofuel dryers; Drifterfarenheter fraan aangtorkar och direkta roekgastorkar

    Energy Technology Data Exchange (ETDEWEB)

    Berge, Christian; Dejfors, Charlotte [AaF Energikonsult Stockholm AB (Sweden)

    2000-01-01

    A study regarding operation experiences of indirect steam dryers and direct flue gas dryers of biofuels has been conducted. In the study, plants with the two types of dryers have been visited and operational experiences have been gathered and analysed. Results show that the well proven technique with flue gas dryers has a higher availability than the steam dryers. Several plants have problem with the feeding and discharge systems. Material selection is very important to prevent corrosion. Indirect steam dryers have more environmental regulations than flue gas dryers because of the generated condensate from the fuel drying process. Future work should concentrate on material selections, refining the feeding and discharge systems and control system.

  2. The reliability of structural systems operating at high temperature: Replacing engineering judgement with operational experience

    International Nuclear Information System (INIS)

    Chevalier, M.J.; Smith, D.J.; Dean, D.W.

    2012-01-01

    Deterministic assessments are used to assess the integrity of structural systems operating at high temperature by providing a lower bound lifetime prediction, requiring considerable engineering judgement. However such a result may not satisfy the structural integrity assessment purpose if the results are overly conservative or conversely plant observations (such as failures) could undermine the assessment result if observed before the lower bound lifetime. This paper develops a reliability methodology for high temperature assessments and illustrates the impact and importance of managing the uncertainties within such an analysis. This is done by separating uncertainties into three classifications; aleatory uncertainty, quantifiable epistemic uncertainty and unquantifiable epistemic uncertainty. The result is a reliability model that can predict the behaviour of a structural system based upon plant observations, including failure and survival data. This can be used to reduce the over reliance upon engineering judgement which is prevalent in deterministic assessments. Highlights: ► Deterministic assessments are shown to be heavily reliant upon engineering judgment. ► Based upon the R5 procedure, a reliability model for a structural system is developed. ► Variables must be classified as either aleatory or epistemic to model their impact on reliability. ► Operation experience is then used to reduce reliance upon engineering judgment. ► This results in a model which can predict system behaviour and learn from operational experience.

  3. Experience gained from the operation of two α-monitors in ''PUTE''

    International Nuclear Information System (INIS)

    Groll, P.; Persohn, M.; Roeder, L.; Roemer, J.; Schuler, B.

    1983-04-01

    The operation of two α-monitors of the ''drum-cell''-type in the plutonium facility ''PUTE'' is described. The instruments were installed in the AW- and the BW-stream. After a short description of the monitor, the different operating modes and of installation details, the experience gained from two weeks of continuous operation is described. The advantages of the use of in-line-instruments compared with laboratory analyses of samples are discussed. The instruments were available for 97 or 94% of the time. (orig.) [de

  4. Short-radius horizontal well re-entry learning curve: prize, cost and operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Boote, K. [Ocelot Energy Inc., Calgary, AB (Canada); MacDonald, R. [Lauron Engineering Ltd, Calgary, AB (Canada)

    1997-12-01

    Six mature vertical wells in Alberta belonging to Ocelot Energy Inc., were reentered and drilled horizontally. Experiences gained, the modifications made to the drilling program and the rewards in the form of incremental oil, were discussed. Details of pre- and post-performance, operational experiences with exiting the casing, building the curve, overbalance versus underbalanced drilling, motors, directional equipment, setting liners, remedial workovers and the cost of the operation were part of the discussion.

  5. Operational Experience and Performance with the ATLAS Pixel detector

    CERN Document Server

    Martin, Christopher Blake; The ATLAS collaboration

    2018-01-01

    The tracking performance of the ATLAS detector relies critically on its 4-layer Pixel Detector, that has undergone significant hardware and software upgrades to meet the challenges imposed by the higher collision energy, pileup and luminosity that are being delivered by the Large Hadron Collider, with record breaking instantaneous luminosities of $1.3\\times10^{34}\\text{cm}^{{-2}}\\text{s}^{{-1}}$ recently surpassed. The key status and performance metrics of the ATLAS Pixel Detector are summarized, and the operational experience and requirements to ensure optimum data quality and data taking efficiency are described, with special emphasis to radiation damage experience.

  6. Operational Experience and Performance with the ATLAS Pixel detector

    CERN Document Server

    Martin, Christopher Blake; The ATLAS collaboration

    2018-01-01

    The tracking performance of the ATLAS detector relies critically on its 4-layer Pixel Detector, that has undergone significant hardware and software upgrades to meet the challenges imposed by the higher collision energy, pileup and luminosity that are being delivered by the Large Hadron Collider, with record breaking instantaneous luminosities of 1.3 x 10^34 cm-2 s-1 recently surpassed. The key status and performance metrics of the ATLAS Pixel Detector are summarised, and the operational experience and requirements to ensure optimum data quality and data taking efficiency are described, with special emphasis to radiation damage experience.

  7. Philosophy of experiment in early modern England: the case of Bacon, Boyle and Hooke.

    Science.gov (United States)

    Anstey, Peter R

    2014-01-01

    Serious philosophical reflection on the nature of experiment began in earnest in the seventeenth century. This paper expounds the most influential philosophy of experiment in seventeenth-century England, the Bacon-Boyle-Hooke view of experiment. It is argued that this can only be understood in the context of the new experimental philosophy practised according to the Baconian theory of natural history. The distinctive typology of experiments of this view is discussed, as well as its account of the relation between experiment and theory. This leads into an assessment of other recent discussions of early modern experiment, namely, those of David Gooding, Thomas Kuhn, J.E. Tiles and Peter Dear.

  8. Important first encounter: Service user experience of pathways to care and early detection in first-episode psychosis.

    Science.gov (United States)

    Jansen, Jens Einar; Pedersen, Marlene Buch; Hastrup, Lene Halling; Haahr, Ulrik Helt; Simonsen, Erik

    2018-04-01

    Long duration of untreated psychosis is associated with poor clinical and functional outcomes. However, few systematic attempts have been made to reduce this delay and little is known of service users' experience of early detection efforts. We explored service users' experience of an early detection service and transition to specialized treatment service, including pathway to care, understanding of illness and barriers to adequate assessment and treatment. In-depth interviews were conducted with 10 service users (median age 21, range 18-27, five males and five females) who were diagnosed with a first-episode non-affective psychosis and who were seen by an early detection team (TOP) and currently enrolled in a specialized early intervention service for this disorder (OPUS). Stigma and fear of the 'psychiatric system' were reported as significant barriers to help seeking, while family members were seen as a crucial support. Moreover, the impact of traumatic events on the experience and development of psychosis was highlighted. Finally, participants were relieved by the prospect of receiving help and the early detection team seemed to create a trusting relationship by offering a friendly, 'anti-stigmatized' space, where long-term symptomatology could be disclosed through accurate and validating questioning. Early detection services have two important functions. One is to make accurate assessments and referrals. The other is to instil hope and trust, and to facilitate further treatment by forming an early therapeutic alliance. The findings in this study provide important insights into the way in which early detection efforts and pathways to care are experienced by service users, with direct implications for improving psychiatric services. © 2015 Wiley Publishing Asia Pty Ltd.

  9. The Gerbil Jar: A Basic Home Experience in Operant Conditioning.

    Science.gov (United States)

    Plant, L.

    1980-01-01

    Explains how a teaching method such as allowing students to raise gerbils at home can encourage students to gain experience with the fundamental techniques of operant conditioning which are otherwise generally unavailable to students in large introductory psychology courses. (DB)

  10. DNA Methylation: A Mechanism for Embedding Early Life Experiences in the Genome

    Science.gov (United States)

    Szyf, Moshe; Bick, Johanna

    2013-01-01

    Although epidemiological data provide evidence that early life experience plays a critical role in human development, the mechanism of how this works remains in question. Recent data from human and animal literature suggest that epigenetic changes, such as DNA methylation, are involved not only in cellular differentiation but also in the…

  11. Student agreement regarding adequacy of didactic content and practical experiences of vaccination clinic business operations.

    Science.gov (United States)

    George, David L; Johnson, Eric J; O'Neal, Katherine S; Smith, Michael J

    2018-04-01

    To report student perceived adequacy regarding didactic content and practical experiences of vaccination clinic business operations. Didactic content, a case study, and practical experiences regarding vaccination clinic business operations were implemented in related lectures of a Pharmacy Business and Entrepreneurship (PBE) elective and the college of pharmacy sponsored vaccination clinics. An online survey was used to evaluate student perceived adequacy of didactic content and practical experiences of vaccination clinic business operations. Mean scaled agreement was compared between students in the PBE elective versus those not in the elective. Student confidence in performing business operations was also assessed. Students in the PBE had higher mean confidence than non-elective students regarding staff management (3.23 vs. 2.73, p = 0.04). Success of the interventions may be attributed to students in the PBE elective that reported a higher mean perceived adequacy of content and practical experiences and confidence in performing nearly all business operations. Still, further evaluation of interventions is being considered to assess effectiveness of learning. Published by Elsevier Inc.

  12. Main corrective measures in an early phase of nuclear power plants’ preparation for safe long term operation

    Energy Technology Data Exchange (ETDEWEB)

    Krivanek, Robert, E-mail: r.krivanek@iaea.org [International Atomic Energy Agency (IAEA), Department of Nuclear Safety and Security, Operational Safety Section, Vienna 1400 (Austria); Fiedler, Jan, E-mail: fiedler@fme.vutbr.cz [University of Technology Brno, Faculty of Mechanical Engineering, Energy Institute, Technická 2896/2, 616 69 Brno (Czech Republic)

    2017-05-15

    Highlights: • Results of SALTO missions provide the most important issues for safe long term operation (LTO) of nuclear power plants. • The most important technical corrective measures in an early phase of preparation for safe LTO are described. • Their satisfactory resolution creates a basis for further activities to demonstrate preparedness for safe LTO. - Abstract: This paper presents the analysis of main technical deficiencies of nuclear power plants (NPPs) in preparedness for safe long term operation (LTO) and the main corrective measures in an early phase of preparation for safe LTO of NPPs. It focuses on technical aspects connected with management of physical ageing of NPP structures, systems and components (SSCs). It uses as a basis results of IAEA SALTO missions performed between 2005 and 2016 (see also paper NED8805 in Nuclear Engineering and Design in May 2016) and the personal experiences of the authors with preparation of NPPs for safe LTO. This paper does not discuss other important aspects of safe LTO of NPPs, e.g. national nuclear energy policies, compliance of NPPs with the latest international requirements on design, obsolescence, environmental impact and economic aspects of LTO. Chapter 1 provides a brief introduction of the current status of the NPP’ fleet in connection with LTO. Chapter 2 provides an overview of SALTO peer review service results with a focus on deficiencies related to physical ageing of safety SSCs and a demonstration that SSCs will perform their safety function during the intended period of LTO. Chapter 3 discusses the main corrective measures which NPPs typically face during the preparation for demonstration of safe LTO. Chapter 4 summarizes the current status of the NPP’ fleet in connection with LTO and outlines further steps needed in preparation for safe LTO.

  13. Evaluation of operating experience for service life of components

    International Nuclear Information System (INIS)

    Schulz, H.; Sunder, R.

    1987-01-01

    The evaluation of the operating experience of German light-water reactor components based on licensee event reports indicates that a large part of the defects and failures are caused by fatigue and/or corrosion type mechanisms. Actions have been taken to eliminate the causes by redesigning systems, replacement of components and change of operating procedures. The interaction of fatigue and corrosion mechanisms are not understood in all details today, further research is still necessary. To establish a more realistic data base of the local loading and water chemistry condition for all loading conditions the application of advanced monitoring systems is proposed. The benefits of these systems are that the operating procedures can be further optimized, the actual used life time fraction can be calculated regularly and the data base can be used for life time extension. (orig.) [de

  14. [Influence of early kinesitherapy on rehabilitation postoperative recovery in case of low extremity operations].

    Science.gov (United States)

    Tanović, Edina

    2009-01-01

    Arteriosclerosis is a disease effecting large elastic, elastic muscular and large muscular arteries. The primary pathological changes are found inside the arteries. Salient feature is atherosclerotic plaque. The main purpose of this paper is to determine whether early kinesitherapy with verticalization and mobilization can give better rehabilitation results with patients after lower extremities operation, in comparison to patients which were not mobilized early in this stage. In this paper we have analyzed two groups of 40 patients that were operatively treated for circulation obstruction to lower extremities. The first, tested group was treated with early kinesiotherapy with early verticalization and mobilization. The second, controlled group was treated with kinesitherapy in bed. All the patients were analyzed according to their gender, age, primary diagnosis, postoperative complications, as well as capabilities for everyday activities. For the evaluation of the everyday life activities we used the Barthel index at hospital admission and discharge. Both groups of patients were equable in gender and age. The most common age group within the tested groups was between 61-70 for males and 51-60 for woman.The most common type of obstruction in both groups was occlusion of femoral artery. The complications which occurred among the tested patients were thrombosis, ileus and contracture in 7.5% of cases, while 85% of patients did not have any complications. Within the controlled group, decubitus occurred in 7.5% of cases, as well as gangrene and ileus. Ulcus occurred in 5% of patients, thrombosis in 10%, and contracture in 4% of cases. 40% of patients in this group were without complications. Based on the results stated above we can conclude that early kinesitherapy with verticalization and mobilization of patients in postoperative phase after the treatment of lower extremities obstruction, have shown much better results in comparison to the patients which were only

  15. Operating experience with PWR in the FRG (Federal Republic of Germany)

    International Nuclear Information System (INIS)

    Cramer, H.

    1980-01-01

    Operating experiences with PWR's in the Federal Republic of Germany has been exclusively with KWU turnkey power plants with U tube steam generators. Such experience started with the 345 MW Obrigheim plant in 1968 and includes the 670 MW Stade plant, the 1200/1300 MW Biblis plants, The 900 MW Neckarwestheim and the 1300 MW Unterweser plants. (E.G.) [pt

  16. Operating experience and maintenance at the TRIGA Mark II LENA reactor

    International Nuclear Information System (INIS)

    Cingoli, F.; Meloni, S.; Alloni, L.

    1986-01-01

    A summary of reactor operation and maintenance in the time period 1982-1986 is presented and discussed. Some problems occurred from instrumentated aluminum cladded elements. Both of them presented damage in the cable tubes and one element showed a protuberance in the cladding. They were replaced with stainless - steel cladded ones. Both elements were sealed up in stainless - steel tubes and put away in wells, 3 meters deep, in the reactor room floor. Some minor problems, correlated to the quite aid instrumentation of the console, are reported. The reactor activity in the last four years was conditioned by the developing of the n - n-bar oscillation NADIR experiment. The thermal column was dismantled and rebuilt in consideration of the Nadir experiment necessities and this job is described in detail. The building containing, the target and the void pipe, presented in 1982 Conference, are now completely operating and the experiment is running. (author)

  17. Minding experience: An exploration of the concept of "experience" in the early French anthropology of Durkheim, Lévy-Bruhl, and Lévi-Strauss.

    Science.gov (United States)

    Throop, C Jason

    2003-01-01

    In line with the growing concern with the unexamined reliance upon the concept of "experience" in anthropology, this article explores in some detail the various usages and definitions of the concept in the work of three of early French anthropology's most influential theorists: Emile Durkheim (1858-1918), Lucien Lévy-Bruhl (1857-1939), and Claude Lévi-Strauss (1908-). With its important influence on both British and American anthropology, the early French anthropological tradition, as epitomized in the writings of these three thinkers, has indeed played a pivotal role in shaping many current taken-for-granted understandings of the concept of experience in the discipline of anthropology as a whole. In the process of exploring how experience is viewed by these three scholars, this paper will thus take some initial steps toward the historical contextualization of many of the unquestioned assumptions underpinning current understandings of experience in the discipline of anthropology and the social sciences more generally. Copyright 2003 Wiley Periodicals, Inc.

  18. Operating experience review for nuclear power plants in the Systematic Evaluation Program

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    The Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program (SEP) whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. This paper describes the methodology and results of the operational experience review portion of the SEP evaluation. SEPB will combine the results from these operational reviews with other safety topic evaluations to perform an integrated assessment of the SEP plants

  19. Application of ASSET methodology and operational experience feedback of NPPs in China

    Energy Technology Data Exchange (ETDEWEB)

    Lan, Ziyong [The National Nuclear Safety Administration, Beijing (China)

    1997-10-01

    The introductive presentation of ASSET methodology to China started in March 1992, 3 experts from the IAEA held the ASSET Seminar in Wuhan, China. Three years later, an IAEA seminar on ASSET Method and Operational Experience Feedback proceeded in Beijing on 20-24 March 1995. Another ASSET seminar on Self-Assessment and Operational Experience Feedback was held at Guangdong NPP site on 2-6 December 1996, The NNSA and the GNPP hosted the seminar, 2 IAEA experts, 55 participants from the NPPs, research institutes, the regulatory body (NNSA) and its regional offices attended the seminar. 3 figs, 5 tabs.

  20. Application of ASSET methodology and operational experience feedback of NPPs in China

    International Nuclear Information System (INIS)

    Ziyong Lan

    1997-01-01

    The introductive presentation of ASSET methodology to China started in March 1992, 3 experts from the IAEA held the ASSET Seminar in Wuhan, China. Three years later, an IAEA seminar on ASSET Method and Operational Experience Feedback proceeded in Beijing on 20-24 March 1995. Another ASSET seminar on Self-Assessment and Operational Experience Feedback was held at Guangdong NPP site on 2-6 December 1996, The NNSA and the GNPP hosted the seminar, 2 IAEA experts, 55 participants from the NPPs, research institutes, the regulatory body (NNSA) and its regional offices attended the seminar. 3 figs, 5 tabs

  1. Team play with a powerful and independent agent: operational experiences and automation surprises on the Airbus A-320

    Science.gov (United States)

    Sarter, N. B.; Woods, D. D.

    1997-01-01

    Research and operational experience have shown that one of the major problems with pilot-automation interaction is a lack of mode awareness (i.e., the current and future status and behavior of the automation). As a result, pilots sometimes experience so-called automation surprises when the automation takes an unexpected action or fails to behave as anticipated. A lack of mode awareness and automation surprises can he viewed as symptoms of a mismatch between human and machine properties and capabilities. Changes in automation design can therefore he expected to affect the likelihood and nature of problems encountered by pilots. Previous studies have focused exclusively on early generation "glass cockpit" aircraft that were designed based on a similar automation philosophy. To find out whether similar difficulties with maintaining mode awareness are encountered on more advanced aircraft, a corpus of automation surprises was gathered from pilots of the Airbus A-320, an aircraft characterized by high levels of autonomy, authority, and complexity. To understand the underlying reasons for reported breakdowns in human-automation coordination, we also asked pilots about their monitoring strategies and their experiences with and attitude toward the unique design of flight controls on this aircraft.

  2. ATLAS Operations: Experience and Evolution in the Data Taking Era

    International Nuclear Information System (INIS)

    Ueda, I

    2011-01-01

    This paper summarises the operational experience and improvements of the ATLAS hierarchical multi-tier computing infrastructure in the past year leading to taking and processing of the first collisions in 2009 and 2010. Special focus will be given to the Tier-0 which is responsible, among other things, for a prompt processing of the raw data coming from the online DAQ system and is thus a critical part of the chain. We will give an overview of the Tier-0 architecture, and improvements based on the operational experience. Emphasis will be put on the new developments, namely the Task Management System opening Tier-0 to expert users and Web 2.0 monitoring and management suite. We then overview the achieved performances with the distributed computing system, discuss observed data access patterns over the grid and describe how we used this information to improve analysis rates.

  3. Operating experience with nuclear power stations in Member States in 2005

    International Nuclear Information System (INIS)

    2006-10-01

    This report is the thirty-seventh in the Agency's series of annual reports on operating experience with nuclear power stations in Member States. For the first time it is issued purely in an electronic version. The report is a direct output from the Agency's Power Reactor Information System (PRIS), whose databank contains all operating experience data published in the Agency's operating experience annual reports since 1970 and basic information on power reactors, including design data. It presents operating experience data for all worldwide nuclear power plants after starting commercial operation. The PRIS databank is available free of charge to IAEA Member States through its two services: PRIS-PC, and PRIS CD-ROM. The PRIS-PC allows direct access to the database through the Internet. The PRIS-PC on CD-ROM only includes data for reactors in operation, under construction and shutdown. It keeps the same feature as in the current front-end-tool PRIS-PC interface. This front-end-tool interface allows to search and query through pre-designed statistics. The PRIS-PC on CD-ROM contains mapping interface including a view of the world map with zooming features to country, region and site map and links to PRIS database to retrieve related (nuclear power plant) information. PRIS data and related indicators are also available on the PRIS Website: www.iaea.org/programmes/a2. It contains publicly available information about reactor units and nuclear industry results. Load, operation and availability factors are used as the basic performance indicators. Energy unavailability factors, separate for planned and unplanned unavailability, due either to causes under plant management control or external causes out of plant management control, are used as a measure of energy lost through a unit not being available. However, some ambiguity remains in the operators' reports of the unavailability data, resulting in inconsistencies in these factors. It is recognized that there is an inherent

  4. Operating experience with nuclear power stations in Member States in 2006

    International Nuclear Information System (INIS)

    2007-08-01

    This report is the thirty-eighth in the Agency's series of annual reports on operating experience with nuclear power stations in Member States. For the second time it is issued purely in an electronic version. The report is a direct output from the Agency's Power Reactor Information System (PRIS), whose databank contains all operating experience data published in the Agency's operating experience annual reports since 1970 and basic information on power reactors, including design data. It presents operating experience data for all worldwide nuclear power plants after starting commercial operation. The PRIS databank is available free of charge to IAEA Member States through its services: web-based PRIS-Statistics (http://prisweb.iaea.org/statistics/), PRIS-PC, PRIS CD-ROM and PRIS Website. The PRIS-Statistics and PRIS-PC allow direct access to the database through the Internet. The PRIS-PC on CD-ROM only includes data for reactors in operation, under construction and shutdown. It keeps the same feature as in the current front-end-tool PRIS-PC interface. This front-endtool interface allows to search and query through pre-designed statistics. PRIS data and related indicators are also available on the PRIS Website: www.iaea.org/programmes/a2. It contains publicly available information about reactor units and nuclear industry results. Load, operation and availability factors are used as the basic performance indicators. Energy unavailability factors, separate for planned and unplanned unavailability, due either to causes under plant management control or external causes out of plant management control, are used as a measure of energy lost through a unit not being available. However, some ambiguity remains in the operators' reports of the unavailability data, resulting in inconsistencies in these factors. It is recognized that there is an inherent difficulty in reporting unavailability in energy due to external causes with relation to energy losses due to load following

  5. Operating experience with superconducting cavities at the TESLA test facility

    International Nuclear Information System (INIS)

    Moeller, Wolf-Dietrich

    2003-01-01

    A description of the TESLA Test Facility, which has been set up at DESY by the TeV Energy Superconducting Accelerator (TESLA) collaboration, will be given as it is now after five years of installation and operation. The experience with the first three modules, each containing 8 superconducting 9-cell cavities, installed and operated in the TTF-linac will be described. The measurements in the vertical and horizontal cryostats as well as in the modules will be compared. Recent results of the operation at the TESLA design current, macropulses of 800 μsec with bunches of 3.2 nC at a rate of 2.25 MHz are given. New measurement results of the higher order modes (HOM) will be presented. The operation and optimisation of the TTF Free Electron Laser (TTF-FEL) will also be covered in this paper. (author)

  6. Early childhood experiences shaping vulnerability to Obsessive-Compulsive Disorder

    Directory of Open Access Journals (Sweden)

    Barbara Barcaccia

    2015-12-01

    Full Text Available According to the literature, inflated responsibility/sensitivity to guilt play a pivotal role in both the genesis and maintenance of Obsessive-Compulsive Disorder (OCD. They may be learned in childhood and adolescence, through particular experiences and parental rearing styles, involving criticism, excessively high standards, and social moralization. Preliminary data on the role of dysfunctional beliefs in the development/maintenance of OCD also show that non-affected family members of OC individuals score higher than controls in domains concerning responsibility, suggesting it might represent a candidate endophenotype for the disorder. Compulsive conducts, that far from being mechanical reactions are instead clearly goal-oriented, may be triggered by the need of preventing responsibility/guilt. Therefore, useful psychological interventions aimed at not only reappraising meanings associated with the specific early experiences connected to hyper-sensitivity to guilt, but also at developing a more general compassionate and forgiving stance towards oneself, may prove particularly effective.

  7. Operating Experience with Nuclear Power Stations in Member States in 2012. 2013 Edition (CD-ROM)

    International Nuclear Information System (INIS)

    2013-07-01

    This report is the forty-fourth in the IAEA’s series of annual reports on operating experience with nuclear power stations in Member States. This report provides annual performance data and outage information for individual nuclear power plants from around the world. Summaries of historical performance and outages during the lifetimes of those plants are also included. Additionally, in order to provide a broad picture of nuclear power usage, this report contains six figures that illustrate global operational statistics through 2012. The report is a direct output from the IAEA’s Power Reactor Information System (PRIS), whose databank contains all operating experience data published in the IAEA’s operating experience annual reports since 1970 and basic information on power reactors, including design data. It presents operating experience data for all worldwide nuclear power plants after starting commercial operation. The PRIS databank is available free of charge to IAEA Member States through its public website and on-line application PRIS-Statistics. The web-site www.iaea.org/pris contains publicly available information about reactor units and nuclear industry results. The PRIS-Statistics (http://pris.iaea.org) allows direct access to the database through the Internet. This application allows registered users report generation through pre-designed reports and filters

  8. Early visual experience and the recognition of basic facial expressions: involvement of the middle temporal and inferior frontal gyri during haptic identification by the early blind

    Science.gov (United States)

    Kitada, Ryo; Okamoto, Yuko; Sasaki, Akihiro T.; Kochiyama, Takanori; Miyahara, Motohide; Lederman, Susan J.; Sadato, Norihiro

    2012-01-01

    Face perception is critical for social communication. Given its fundamental importance in the course of evolution, the innate neural mechanisms can anticipate the computations necessary for representing faces. However, the effect of visual deprivation on the formation of neural mechanisms that underlie face perception is largely unknown. We previously showed that sighted individuals can recognize basic facial expressions by haptics surprisingly well. Moreover, the inferior frontal gyrus (IFG) and posterior superior temporal sulcus (pSTS) in the sighted subjects are involved in haptic and visual recognition of facial expressions. Here, we conducted both psychophysical and functional magnetic-resonance imaging (fMRI) experiments to determine the nature of the neural representation that subserves the recognition of basic facial expressions in early blind individuals. In a psychophysical experiment, both early blind and sighted subjects haptically identified basic facial expressions at levels well above chance. In the subsequent fMRI experiment, both groups haptically identified facial expressions and shoe types (control). The sighted subjects then completed the same task visually. Within brain regions activated by the visual and haptic identification of facial expressions (relative to that of shoes) in the sighted group, corresponding haptic identification in the early blind activated regions in the inferior frontal and middle temporal gyri. These results suggest that the neural system that underlies the recognition of basic facial expressions develops supramodally even in the absence of early visual experience. PMID:23372547

  9. Early experiences building a software quality prediction model

    Science.gov (United States)

    Agresti, W. W.; Evanco, W. M.; Smith, M. C.

    1990-01-01

    Early experiences building a software quality prediction model are discussed. The overall research objective is to establish a capability to project a software system's quality from an analysis of its design. The technical approach is to build multivariate models for estimating reliability and maintainability. Data from 21 Ada subsystems were analyzed to test hypotheses about various design structures leading to failure-prone or unmaintainable systems. Current design variables highlight the interconnectivity and visibility of compilation units. Other model variables provide for the effects of reusability and software changes. Reported results are preliminary because additional project data is being obtained and new hypotheses are being developed and tested. Current multivariate regression models are encouraging, explaining 60 to 80 percent of the variation in error density of the subsystems.

  10. Sociodemographic differences in women’s experience of early labour care: a mixed methods study

    Science.gov (United States)

    Henderson, Jane; Redshaw, Maggie

    2017-01-01

    Objectives To explore women’s experiences of early labour care focusing on sociodemographic differences, and to examine the effect of antenatal education, using mixed methods. Setting England, 2014. Participants Women who completed postal questionnaires about their experience of maternity care, including questions about antenatal education, early labour and sociodemographic factors, included space for free-text comments. Outcome measures Worries about labour, contact with midwives in early labour and subsequent care. Methods This study was based on secondary analysis of a national maternity survey carried out in England in 2014. Quantitative data were analysed using descriptive statistics and binary logistic regression; qualitative data were analysed using a thematic content analytic approach. Results Completed questionnaires were received from 4578 women (47% response rate). There were significant differences by sociodemographic factors, particularly ethnicity, in women’s worries about early labour. Compared with white women, women from black or minority ethnic groups had an adjusted OR of 1.93 (95% CI 1.56 to 2.39) of feeling worried about not knowing when labour would start. Among women who contacted a midwife at the start of labour, 84% perceived their advice as appropriate, more in older and multiparous women. Overall, 64% of women were asked to come to the hospital at this time, more in multiparous women (adjusted OR 1.63, 95% CI 1.35 to 1.96). Those who did not have access to antenatal education experienced greater worry about early labour. Five themes emerged from the qualitative analysis: ‘Differentiating between early and active labour’, ‘Staff attitudes’, ‘Not being allowed…’, ‘Previous labours’ and ‘Perceived consequences for women’. Conclusion These findings reinforce the importance of providing reassurance to women in early labour, taking care that women do not feel neglected or dismissed. In particular, primiparous and

  11. Experience gained in enhancing operational safety at ComEd`s nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The following aspects of experience gained in enhancing operational safety at Comed`s nuclear power plants are discussed: nuclear safety policy; centralization/decentralization; typical nuclear operating organization; safety review boards; human performance enhancement; elements of effective nuclear oversight.

  12. Operating practical experience at Argentina; Experiencia practica operativa en la Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Quihillalt, Oscar [Nucleoelectria Argentina S.A., Buenos Aires (Argentina)

    1998-12-31

    Operating experiences of Atucha-1 and Embalse Nuclear Power Plants were discussed in this work. The technical and economic aspects, such as reliability, availability, personnel training, operating costs, prices and market, which exercise influence upon Argentina nuclear energy policy, mainly on the power electric generation by nuclear power plants were considered. Finally the current status of the nucleoelectric sector in Argentina and forecasting were analysed. 3 figs., 5 tabs.

  13. Operational experience gained from the Central Brae subsea field

    International Nuclear Information System (INIS)

    Sapp, S.J.; Gomersall, S.D.

    1994-01-01

    The size of the field discoveries made in the North Sea in recent years has declined dramatically. With the low oil price many small fields are not viable stand alone developments. The North Sea has a large, well developed infrastructure of production facilities and pipelines. With many platforms now operating below optimum production rate, subsea tieback of these small fields utilizing the available processing capacity is the most economically attractive means of development. This paper presents a history of such a field development. The Central Brae field is located within the Brae complex of fields, 155 miles north east of Aberdeen, and has been developed by means of a subsea facility tied back to the Brae Alpha platform. A great deal of experience has been gained through the field development, not only in subsea operations but also in completion and template design and operating philosophy

  14. SUPERCONDUCTING RADIO-FREQUENCY MODULES TEST FACILITY OPERATING EXPERIENCE

    International Nuclear Information System (INIS)

    Soyars, W.; Bossert, R.; Darve, C.; Degraff, B.; Klebaner, A.; Martinez, A.; Pei, L.; Theilacker, J.

    2008-01-01

    Fermilab is heavily engaged and making strong technical contributions to the superconducting radio-frequency research and development program (SRF R and D). Four major SRF test areas are being constructed to enable vertical and horizontal cavity testing, as well as cryomodule testing. The existing Fermilab cryogenic infrastructure has been modified to service the SRF R and D needs. The project's first stage has been successfully completed, which allows for distribution of cryogens for a single-cavity cryomodule using the existing Cryogenic Test Facility (CTF) that houses three Tevatron satellite refrigerators. The cooling capacity available for cryomodule testing at Meson Detector Building (MDB) results from the liquefaction capacity of the CTF cryogenic system. The cryogenic system for a single 9-cell cryomodule is currently operational. The paper describes the status, challenges and operational experience of the initial phase of the project

  15. INEL experience and capabilities in design, operation, and maintenance of nuclear systems

    International Nuclear Information System (INIS)

    Leatham, J.; Masson, L.S.

    1982-07-01

    This study provides an overview of the experience, hardware, and managerial expertise available at the INEL for design, fabrication, and operation of tools and facilities for remote maintenance. The survey demonstrates that the INEL's fission reactor experience is directly applicable to the design of remote handling hardware which must be developed for fusion reactors, and that the experience and facilities are available at INEL to begin that work

  16. JET-ISX-B beryllium limiter experiment safety analysis report and operational safety requirements

    International Nuclear Information System (INIS)

    Edmonds, P.H.

    1985-09-01

    An experiment to evaluate the suitability of beryllium as a limiter material has been completed on the ISX-B tokamak. The experiment consisted of two phases: (1) the initial operation and characterization in the ISX experiment, and a period of continued operation to the specified surface fluence (10 22 atoms/cm 2 ) of hydrogen ions; and (2) the disassembly, decontamination, or disposal of the ISX facility. During these two phases of the project, the possibility existed for beryllium and/or beryllium oxide powder to be produced inside the vacuum vessel. Beryllium dust is a highly toxic material, and extensive precautions are required to prevent the release of the beryllium into the experimental work area and to prevent the contamination of personnel working on the device. Details of the health hazards associated with beryllium and the appropriate precautions are presented. Also described in appendixes to this report are the various operational safety requirements for the project

  17. Operating experiences on ammonia water exchange system at Heavy Water Plant, Talcher (paper No. 6.12)

    International Nuclear Information System (INIS)

    Venkat Ram, D.; Sharma, A.K.

    1992-01-01

    The Heavy Water Plant at Talcher employs bithermal ammonia hydrogen exchange process for the production of heavy water. The paper describes about the existing ammonia water exchange column, its start-up, operating experience and the problems encountered in operation of the column. The operating experiences gained and the data collected over the last few years can be utilised for design and operation of new ammonia water exchange column. (V.R). 2 figs

  18. Predictive Power of the NSQIP Risk Calculator for Early Post-Operative Outcomes After Whipple: Experience from a Regional Center in Northern Ontario.

    Science.gov (United States)

    Jiang, Henry Y; Kohtakangas, Erica L; Asai, Kengo; Shum, Jeffrey B

    2017-05-02

    NSQIP Risk Calculator was developed to allow surgeons to inform their patients about their individual risks for surgery. Its ability to predict complication rates and length of stay (LOS) has made it an appealing tool for both patients and surgeons. However, the NSQIP Risk Calculator has been criticized for its generality and lack of detail towards surgical subspecialties, including the hepatopancreaticobiliary (HPB) surgery. We wish to determine whether the NSQIP Risk Calculator is predictive of post-operative complications and LOS with respect to Whipple's resections for our patient population. As well, we wish to identify strategies to optimize early surgical outcomes in patients with pancreatic cancer. We conducted a retrospective review of patients who underwent elective Whipple's procedure for benign or malignant pancreatic head lesions at Health Sciences North (Sudbury, Ontario), a tertiary care center, from February 2014 to August 2016. Comparisons of LOS and post-operative complications between NSQIP-predicted and actual ones were carried out. NSQIP-predicted complications rates were obtained using the NSQIP Risk Calculator through pre-defined preoperative risk factors. Clinical outcomes examined, at 30 days post-operation, included pneumonia, cardiac events, surgical site infection (SSI), urinary tract infection (UTI), venous thromboembolism (VTE), renal failure, readmission, and reoperation for procedural complications. As well, mortality, disposition to nursing or rehabilitation facilities, and LOS were assessed. A total of 40 patients underwent Whipple's procedure at our center from February 2014 to August 2016. The average age was 68 (50-85), and there were 22 males and 18 females. The majority of patients had independent baseline functional status (39/40) with minimal pre-operative comorbidities. The overall post-operative morbidity was 47.5% (19/40). The rate of serious complication was 17.5% with four Clavien grade II, two grade III, and one grade

  19. [Experience with games in operative groups as part of health education for diabetics].

    Science.gov (United States)

    Torres, Heloisa de Carvalho; Hortale, Virginia Alonso; Schall, Virginia

    2003-01-01

    This paper presents and discusses an educational strategy implemented in a specialized hospital clinic. The goal was to stimulate individuals to reflect on their everyday lifestyles as related to their disease, specifically diabetes mellitus. The strategy can be characterized as an educational tool from the perspective of health promotion and disease prevention and control. The experience was implemented on an interactive basis (health professionals and individual patients) with educational games in operative groups. Pedagogical techniques were used: orientation concerning diabetes mellitus, individual consultation, the operative group, and educational games (communications and learning). The techniques enabled participants to improve knowledge and exchange experiences. In addition, the health professionals gained a better understanding of the participants' experience with their illness.

  20. ENDOSCOPIC TECHNOLOGIES IN EARLY RECTAL CANCER TREATMENT

    Directory of Open Access Journals (Sweden)

    D. V. Samsonov

    2015-01-01

    Full Text Available Total mesorectal excision is the “golden standard” of surgical treatment for rectal cancer. Development of endoscopic technologies allowed to implement the benefits of minimally invasive surgery in early rectal cancer treatment, decrease morbidity and mortality, improve functional outcome and quality of life. Oncological safety of this method is still a subject for discussion due to lack of lymph node harvest. Endoscopic operations for early rectal cancer are being actively implemented in daily practice, but lack of experience does not allow to include this method in national clinical prac-tice guidelines.

  1. Liquid radwaste processing, operational experience utilizing Duratek Mobile Process System (MPS)

    International Nuclear Information System (INIS)

    Hunkele, W.; Jensen, C.E.; Duratek Corp., Beltsville, MD)

    1985-01-01

    The use of Duratek's Mobile Process System (MPS) employing sluiceable pressure vessels and improved operational techniques generates operational efficiencies including volume reduction (VR), reduced personnel labor and exposure and higher flowrates for cleanup of liquid radwaste streams in an operating nuclear power plant (Salem Generating Station). Significant additional VR is achievable based on laboratory and on-site experience utilizing Durasil 70. Under high conductivity, actual waste stream conditions, this proprietary media has demonstrated through-puts of a magnitude 15 times higher than organic cation resin. A long-term problem, cobalt species removal, is mitigated by this media

  2. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture - presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis. - outlines the main reasons for the reliable performance of Swiss nuclear power plants - quality equipment - operator qualification and training - engineering know how on site - maintenance philosophy and outage planning - information system and feedback of experience - explains the management functions as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability - improvement - a feedback control system - analysis of production losses - optimization in shut-down planning - minimizing disturbances during plant operation - optimizing personnel qualification and efficiency. (orig.)

  3. Operation experiences with a 30 kV/100 MVA high temperature superconducting cable system

    DEFF Research Database (Denmark)

    Tønnesen, Ole; Däumling, Manfred; Jensen, Kim Høj

    2004-01-01

    of this demonstration project is to gain experience with HTS cables under realistic conditions in a live distribution network. Approximately 50 000 utility customers have their electric power supplied through the HTS cable. The cable system has delivered 226 GW h of energy and reached a maximum operating current......A superconducting cable based on Bi-2223 tape technology has been developed, installed and operated in the public network of Copenhagen Energy in a two-year period between May 2001 and May 2003. This paper gives a brief overview of the system and analyses some of the operation experiences. The aim...

  4. Operational Experience with the ATLAS Pixel Detector

    CERN Document Server

    Lantzsch, Kerstin; The ATLAS collaboration

    2016-01-01

    Run 2 of the LHC is providing new challenges to track and vertex reconstruction with higher energies, denser jets and higher rates. Therefore the ATLAS experiment has constructed the first 4-layer Pixel detector in HEP, installing a new Pixel layer, also called Insertable B-Layer (IBL). In addition the Pixel detector was refurbished with new service quarter panels to recover about 3% of defective modules lost during run 1 and a new optical readout system to readout the data at higher speed while reducing the occupancy when running with increased luminosity. The commissioning, operation and performance of the 4-layer Pixel Detector will be presented.

  5. The Influence of Spatial Ability and Experience on Spacecraft Rendezvous and Docking Operation Performance

    Directory of Open Access Journals (Sweden)

    Xiaoping eDu

    2015-07-01

    Full Text Available Manual rendezvous and docking (manual RVD is a challenging space task for astronauts. Previous research showed a correlation between spatial ability and manual RVD skills among participants at early stages of training, but paid less attention to experts. Therefore, this study tried to explore the role of spatial ability in manual RVD skills in two groups of trainees, one relatively inexperienced and the other experienced operators. Additionally, mental rotation has been proven essential in RVD and was tested in this study among 27 male participants, 15 novices and 12 experts. The participants performed manual RVD tasks in a high fidelity simulator. Results showed that experience moderated the relation between mental rotation ability and manual RVD performance. On one hand, novices with high mental rotation ability tended to perform that RVD task more successfully; on the other hand, experts with high mental rotation ability showed not only no performance advantage in the final stage of the RVD task, but had certain disadvantages in their earlier processes. Both theoretical and practical implications were discussed.

  6. Summary of facility and operating experience on helium engineering demonstration loop (HENDEL)

    Energy Technology Data Exchange (ETDEWEB)

    Ouchi, Yoshihiro; Fujisaki, Katsuo; Kobayashi, Toshiaki; Kato, Michio; Ota, Yukimaru; Watanabe, Syuji; Kobayashi, Hideki; Mogi, Haruyoshi [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    1996-07-01

    The HENDEL is a test facility to perform full scale demonstration tests on the core internals and high temperature components for the High Temperature Engineering Test Reactor(HTTR). The main systems consist of Mother(M) and Adapter(A), fuel stack Test(T{sub 1}) and in-core structure Test(T{sub 2}) sections. The (M+A) section can supply high temperature helium gas to the test section. The M+A section completed in March 1982 has been operated for about 22900 hours till February 1995. The T{sub 1} and T{sub 2} sections, completed in March 1983 and June 1986, have been operated for about 19400 and 16700 hours, respectively. In this period, a large number of tests have been conducted to verify the performance and safety features of the HTTR components. The results obtained from these tests have been effectively applied to the detailed design, licensing procedures and construction of the HTTR. The operating experience of the HENDEL for more than 10 years also brought us establishment of the technique of operation of a large scale helium gas loop, handling of helium gas and maintenance of high temperature facilities. The technique will be available for the operation of the HTTR. This paper mainly describes the summary of plant facirities, operating experience and maintenance on the HENDEL. (author)

  7. Word learning in deaf children with cochlear implants: effects of early auditory experience.

    Science.gov (United States)

    Houston, Derek M; Stewart, Jessica; Moberly, Aaron; Hollich, George; Miyamoto, Richard T

    2012-05-01

    Word-learning skills were tested in normal-hearing 12- to 40-month-olds and in deaf 22- to 40-month-olds 12 to 18 months after cochlear implantation. Using the Intermodal Preferential Looking Paradigm (IPLP), children were tested for their ability to learn two novel-word/novel-object pairings. Normal-hearing children demonstrated learning on this task at approximately 18 months of age and older. For deaf children, performance on this task was significantly correlated with early auditory experience: Children whose cochlear implants were switched on by 14 months of age or who had relatively more hearing before implantation demonstrated learning in this task, but later implanted profoundly deaf children did not. Performance on this task also correlated with later measures of vocabulary size. Taken together, these findings suggest that early auditory experience facilitates word learning and that the IPLP may be useful for identifying children who may be at high risk for poor vocabulary development. © 2012 Blackwell Publishing Ltd.

  8. Early Mission Maneuver Operations for the Deep Space Climate Observatory Sun-Earth L1 Libration Point Mission

    Science.gov (United States)

    Roberts, Craig; Case, Sara; Reagoso, John; Webster, Cassandra

    2015-01-01

    The Deep Space Climate Observatory mission launched on February 11, 2015, and inserted onto a transfer trajectory toward a Lissajous orbit around the Sun-Earth L1 libration point. This paper presents an overview of the baseline transfer orbit and early mission maneuver operations leading up to the start of nominal science orbit operations. In particular, the analysis and performance of the spacecraft insertion, mid-course correction maneuvers, and the deep-space Lissajous orbit insertion maneuvers are discussed, com-paring the baseline orbit with actual mission results and highlighting mission and operations constraints..

  9. Lagisza, world's largest CFB boiler, begins commercial operation

    Energy Technology Data Exchange (ETDEWEB)

    Nuortimo, K. [Foster Wheeler, Varkaus (Finland)

    2010-04-15

    Early operating experience with the Lagisza circulating fluidised bed (CFB) boiler in Poland - the world's largest such boiler to date, and also the first one with supercritical steam conditions - has been positive. 3 figs., 4 tabs.

  10. Operational experience with a high speed video data acquisition system in Fermilab experiment E-687

    International Nuclear Information System (INIS)

    Baumbaugh, A.E.; Knickerbocker, K.L.; Baumbaugh, B.; Ruchti, R.

    1987-01-01

    Operation of a high speed, triggerable, Video Data Acquisition System (VDAS) including a hardware data compactor and a 16 megabyte First-In-First-Out buffer memory (FIFO) will be discussed. Active target imaging techniques for High Energy Physics are described and preliminary experimental data is reported.. The hardware architecture for the imaging system and experiment will be discussed as well as other applications for the imaging system. Data rates for the compactor is over 30 megabytes/sec and the FIFO has been run at 100 megabytes/sec. The system can be operated at standard video rates or at any rate up to 30 million pixels/second. 7 refs., 3 figs

  11. Experiência inicial com operações cardíacas minimamente invasivas Initial experience with minimally invasive cardiac operations

    Directory of Open Access Journals (Sweden)

    Francisco Costa

    2012-09-01

    initial experience with minimally invasive operations, with emphasis on technical aspects and the learning curve. METHODS: Between July 2009 and March 2012, 95 patients were operated using minimally invasive operations. Mean age was 55 ± 15 years and 53% were females. The operations performed were atrial septal defect closure (25, aortic valve replacement (32, mitral valve repair (23, mitral valve replacement (12, excision of atrial myxoma (2 and resection of subaortic membrane (1. The incision was a mini right thoracotomy in 87 cases and ministernotomy in 8. RESULTS: Early mortality was 4.2%. Mean size of the incision was 6.3 ±1.2 cm. Extension of the original thoracotomy was necessary in only one case. Two patients suffered a stroke, and the mean total blood loss was 470 ± 277 ml. There were no cases of incision infection and 67% the patients had no major morbidity. CONCLUSIONS: Our initial results with minimally invasive operations demonstrated that it was safe and with good clinical results. Patient satisfaction is quite high. After the learning phase has been transversed, minimally invasive operations may be an excellent alternative for many patients with congenital and acquired diseases.

  12. Safety and operating experience at EBR-II: lessons for the future

    International Nuclear Information System (INIS)

    Sackett, J.I.; Golden, G.H.

    1981-01-01

    EBR-II is a small LMFBR power plant that has performed safely and reliably for 16 years. Much has been learned from operating it to facilitate the design, licensing, and operation of large commercial LMFBR power plants in the US. EBR-II has been found relatively easy to keep in conformity with evolving safety requirements, largely because of inherent safety features of the plant. Such features reduce dependence on active safety systems to protect against accidents. EBR-II has experienced a number of plant-transient incidents, some planned, others inadvertent; none has resulted in any significant plant damage. The operating experience with EBR-II has led to the formulation of an Operational Reliability Test Program (ORTP), aimed at showing inherently safe performance of fuel and plant systems

  13. Main components and characteristics of landslide early warning systems operational worldwide

    Science.gov (United States)

    Piciullo, Luca; Cepeda, José

    2017-04-01

    During the last decades the number of victims and economic losses due to natural hazards are dramatically increased worldwide. The reason can be mainly ascribed to climate changes and urbanization in areas exposed at high level of risk. Among the many mitigation measures available for reducing the risk to life related to natural hazards, early warning systems certainly constitute a significant cost-effective option available to the authorities in charge of risk management and governance. The aim is to help and protect populations exposed to natural hazards, reducing fatalities when major events occur. Landslide is one of the natural hazards addressed by early warning systems. Landslide early warning systems (LEWSs) are mainly composed by the following four components: set-up, correlation laws, decisional algorithm and warning management. Within this framework, the set-up includes all the preliminary actions and choices necessary for designing a LEWS, such as: the area covered by the system, the types of landslides and the monitoring instruments. The monitoring phase provides a series of important information on different variables, considered as triggering factors for landslides, in order to define correlation laws and thresholds. Then, a decisional algorithm is necessary for defining the: number of warning levels to be employed in the system, decision making procedures, and everything else system managers may need for issuing warnings in different warning zones. Finally the warning management is composed by: monitoring and warning strategy; communication strategy; emergency plan and, everything connected to the social sphere. Among LEWSs operational worldwide, two categories can be defined as a function of the scale of analysis: "local" and "territorial" systems. The scale of analysis influences several actions and aspects connected to the design and employment of the system, such as: the actors involved, the monitoring systems, type of landslide phenomena

  14. Operating experience feedback report - Solenoid-operated valve problems

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1991-02-01

    This report highlights significant operating events involving observed or potential common-mode failures of solenoid-operated valves (SOVs) in US plants. These events resulted in degradation or malfunction of multiple trains of safety systems as well as of multiple safety systems. On the basis of the evaluation of these events, the Office for Analysis and Evaluation of Operational Data (AEOD) of the US Nuclear Regulatory Commission (NRC) concludes that the problems with solenoid-operated valves are an important issue that needs additional NRC and industry attention. This report also provides AEOD's recommendations for actions to reduce the occurrence of SOV common-mode failures. 115 refs., 7 figs., 2 tabs

  15. Re-operation for aortic and mitral prosthetic dysfunctions.

    Science.gov (United States)

    Kaul, T K; Sastry, M R; Mercer, J L; Meade, J B

    1985-01-01

    The overall incidence of re-operation and prosthetic valve endocarditis was low in the present series as mechanical prostheses were used predominantly. The prosthetic dysfunctions were less frequent following the primary implantation with Bjork Shiley prostheses, but high operative risk was associated with the clotted Bjork Shiley prostheses. We also had unusual experience of strut fracture and sticking of Bjork Shiley discs in the closed position in both aortic and mitral positions. The early deaths were nil since the use of cardioplegic protection. Intra-operative bleeding due to adhesions can be minimised by using synthetic or heterologous pericardium during the primary operation.

  16. Proceedings of the NEA/CSNI-UNIPEDE Specialist Meeting on Operating Experience with Steam Generators

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-07-01

    The long history of operating experience with pressurized water reactors has indicated that the steam generators are of primary importance in nuclear power plant design and operation; this is furthermore confirmed by analyzing the data of the Incident Reporting System (IRS). It is for this reason that the OECD/NEA Committee on the Safety of Nuclear Installations organizes, in cooperation with UNIPEDE, a Specialist Meeting on 'Operating Experience with Steam Generators'. This Specialist Meeting, held in Brussels, Belgium, in September 1991, is hosted by the Belgian Government and AIB-Vincotte Nuclear. In addition to being a follow-up to the October 1984 meeting (organized by the CSNI and UNIPEDE in Stockholm, Sweden), this Meeting reviews the current state-of-the-art of steam generator technology thus providing a forum for the exchange of related experience in operation, inspection, maintenance, repair, modifications, replacement, and licensing requirements pertaining to steam generators. Forty-seven papers are presented in eight sessions entitled: Operating Experience (two sessions), Structural Integrity and Licensing Issues, Analysis and Prediction of Degradation Mechanisms, Inservice Inspection Methods, Preventive and Corrective Actions (two sessions) and Replacement of Steam Generators. There are furthermore two panel sessions entitled 'Observed Degradation Mechanisms and Licensing Positions', and 'Inspection, Repair and Replacement Strategies'. These proceedings consist of a compilation of the papers presented at the Meeting, which is attended by more than one hundred and fifty participants from fifteen countries and several international organisations.

  17. Two-year experience of the Loviisa-1 nuclear power plant operation in Finland

    International Nuclear Information System (INIS)

    Palmgren, A.; Simola, P.; Skyutta, P.; Malkov, Yu.V.; Mal'tsev, B.K.; Shasharin, G.A.

    1979-01-01

    The description of experience of creation and operation of the Loviisa-1 nuclear power plant in Finland is presented. The main stages of power block development were the following: functional tests of systems and equipment, hydraulic tests of the reactor and primary circuit, inspection of equipment, hot testing, testing of protective envelope, second inspection, reactor assembling and fuel loading, physical and power start-up of the reactor, testing of the plant as a whole. Tests of the APP operation on load were particularly extensive. These tests were carried out on the 5, 15, 30, 50, 75 and 92 % thermal power levels of the reactor and covered: physical reactor tests, electric and dynamic tests of the power unit, tests with failures in equipment operation, chemical tests, studies of shielding effectiveness, thermal and guarantee tests. The positive experience of the Loviisa-1 nuclear power plant operation, reactor reliability, fuel element tightness, high efficiency (33.9 %) and satisfactory operation of turbo-generator confirm the success of the Loviisa-1 NPP project

  18. Operating experience and aging-seismic assessment of electric motors

    International Nuclear Information System (INIS)

    Subudhi, M.; Burns, E.L.; Taylor, J.H.

    1985-06-01

    Objectives of this program are to identify concerns related to the aging and service wear of equipment operating in nuclear power plants, to assess their possible impact on plant safety, to identify effective inspection surveillance and monitoring methods and to recommend suitable maintenance practices for mitigating aging related concerns and diminish the rate of degradation due to aging and service wear. Motor design and materials of construction are reviewed to identify age-sensitive components. Operational and accidental stressors are determined, and their effect on promoting aging degradation is assessed. Failure modes, mechanisms, and causes have been reviewed from operating experiences and existing data banks. The study has also included consideration for the seismic correlation of age-degraded motor components. The aforementioned reviews and assessments were assimilated to characterize the dielectric, rotational, and mechanical hazards on motor performance and operational readiness. The functional indicators which can be monitored to assess motor component deterioration due to aging or other accidental stressors are identified. Conforming with the NPAR strategy as outlined in the program plan, the study also includes a preliminary discussion of current standards and guides, maintenance programs, and research activities pertaining to nuclear power plant safety-related electric motors

  19. Early life experiences affect the adaptive capacity of rearing hens during infectious challenges

    NARCIS (Netherlands)

    Walstra, I.; Napel, ten J.; Kemp, B.; Schipper, H.; Brand, van den H.

    2010-01-01

    This study aimed to investigate whether pre- and early postnatal experiences of rearing hens contribute to the ability to cope with infectious challenges at an older age. In a 2 × 2 factorial arrangement, 352 Lohmann Brown chicks were exposed to either suboptimal or optimized incubation plus hatch

  20. Predictions on an HTR coolant composition after operational experience with experimental reactors

    International Nuclear Information System (INIS)

    Nieder, R.

    1981-01-01

    Long-term operational experience of the HTR experimental reactors Dragon (1966 - 1975), Peach Bottom (1967 - 1974) and AVR (since 1967) has yielded a large number of common quantitative and qualitative results about the sources and behaviour of helium impurities in the primary circuits. Additional information has also been obtained from experiments made at the three reactors. The results at the AVR are particularly interesting because the gas outlet temperature can be varied from 770 0 C to 950 0 C when the reactor power is kept constant. Hence they can be studied according to the temperature dependence of all chemical reactions. It should be possible to apply the results from the operating measurements and experiments made at the reactors, in particular the interrelation of the impurity concentrations, to future reactors. The absolute values of these impurity concentrations are obtained first and foremost by the corresponding helium purification constants