WorldWideScience

Sample records for drilling rigs

  1. Drilling rig

    Energy Technology Data Exchange (ETDEWEB)

    Galiopa, A A; Yegorov, E K

    1981-01-04

    A drilling rig is proposed which contains a tower, lifter in the form of n infinite chain, and mobile rotator with holding device connected to the chain, and pipe holder. In order to accelerate the auxiliary operations to move the drilling string and unloaded rotator, the rotator is equipped with a clamp with means for transverse connection of it to both branches of the chain, while the pipe holders equipped with a clamp with means of connecting it to one of the branches of the chain.

  2. Drilling rig mast

    Energy Technology Data Exchange (ETDEWEB)

    Bulgakov, E.S.; Barashkov, V.A.; Lebedev, A.I.; Panin, N.M.; Sirotkin, N.V.

    1981-01-07

    A drilling rig mast is proposed that contains a portal with a carrier shaft hinged to it and struts with stays. In order to decrease the time expended in the assembly and dessembly of the drilling rig, the portal is constructed from mobile and immobile parts that are connected together by a ball pivot; the immobile section of the portal has a T-shaped recess for directing the mobile section.

  3. A drilling rig tower

    Energy Technology Data Exchange (ETDEWEB)

    Mironov, A.A.; Barashkov, V.A.; Bulgakov, E.S.; Kuldoshin, I.P.; Lebedev, A.I.; Papin, N.M.; Rebrik, B.M.; Sirotkin, N.V.

    1981-05-23

    Presentation is made of a drilling rig tower, comprising a gantry, a support shaft with a bracing strut and drawings out, and turn buckles. In order to increase the reliability of the tower in operation, to decrease the over all dimensions in a transport position, and to decrease the amount of time taken to transfer the tower from an operational position into a transportable one, and vice versa, the tower is equipped with a rotary frame made in the form of a triangular prism, whose lateral edges are connected by hinges: the first one with the lower part of the support shaft, the second with the gantry, and the third one to the upper part of the support shaft by means of the drawings out. The large boundary of the rotary frame is connected by a hinge to the support shaft by means of a bracing strut, which is equipped with a slide block connected to it by a hinge, and the rotary frame has a guide for the slide block reinforced to it on the large boundary. Besides this, the lateral edge of the rotary frame is connected to the gantry by means of turn buckles.

  4. Replacement team of mining drilling rigs

    OpenAIRE

    Hamodi, Hussan; Lundberg, Jan

    2014-01-01

    This paper presents a practical model to calculate the optimal replacement time (ORT) of drilling rigs used in underground mining. As a case study, cost data for drilling rig were collected over four years from a Swedish mine. The cost data include acquisition, operating, maintenance and downtime costs when using a redundant rig. A discount rate is used to determine the value of these costs over time. The study develops an optimisation model to identify the ORT of a mining drilling rig which ...

  5. Advanced control strategies for a drill rig

    International Nuclear Information System (INIS)

    Banerjee, A.; Hiller, M.; Fink, B.

    1996-01-01

    The construction of tunnels is usually undertaken using a combination of blasting and drilling to achieve rock excavation. Easy handling and high accuracy, and thus greater efficiency, in drilling rigs is an essential ingredient of successful competition in the market place. This article describes a cartesian control concept used for a twin boom drill rig. This simplifies the handling of a drilling boom, reduces the duration of a working cycle and increases security. A remote control system has been added to the drill rig to support the operator working in complicated environments. (UK)

  6. Rig`s electricity to power top drive drilling system

    Energy Technology Data Exchange (ETDEWEB)

    Liderth, D.

    1996-05-01

    Permanent magnet brushless electric motors to supply torque to more space-efficient top drive drilling assemblies was the solution designed by Kaman Electromagnetic Corporation, working hand-in-hand with Calgary-based Tesco Drilling Technology, to remedy problems created by the bulkiness of standard hydraulic top drive systems. The biggest advantage of using electric over hydraulic top drive systems is the ability to tap into the rig`s existing power source, which lowers both cost and effort. A better power to weight ratio and reduced maintenance requirements are other desirable advantages.

  7. Hydraulic lifter for an underwater drilling rig

    Energy Technology Data Exchange (ETDEWEB)

    Garan' ko, Yu L

    1981-01-15

    A hydraulic lifter is suggested for an underwater drilling rig. It includes a base, hydraulic cylinders for lifting the drilling pipes connected to the clamp holder and hydraulic distributor. In order to simplify the design of the device, the base is made with a hollow chamber connected to the rod cavities and through the hydraulic distributor to the cavities of the hydraulic cylinders for lifting the drilling pipes. The hydraulic distributor is connected to the hydrosphere through the supply valve with control in time or by remote control. The base is equipped with reverse valves whose outlets are on the support surface of the base.

  8. Deep water challenges for drilling rig design

    Energy Technology Data Exchange (ETDEWEB)

    Roth, M [Transocean Sedco Forex, Houston, TX (United States)

    2001-07-01

    Drilling rigs designed for deep water must meet specific design considerations for harsh environments. The early lessons for rig design came from experiences in the North Sea. Rig efficiency and safety considerations must include structural integrity, isolated/redundant ballast controls, triple redundant DP systems, enclosed heated work spaces, and automated equipment such as bridge cranes, pipe handling gear, offline capabilities, subsea tree handling, and computerized drill floors. All components must be designed to harmonize man and machine. Some challenges which are unique to Eastern Canada include frequent storms and fog, cold temperature, icebergs, rig ice, and difficult logistics. This power point presentation described station keeping and mooring issues in terms of dynamic positioning issues. The environmental influence on riser management during forced disconnects was also described. Design issues for connected deep water risers must insure elastic stability, and control deflected shape. The design must also keep stresses within acceptable limits. Codes and standards for stress limits, flex joints and tension were also presented. tabs., figs.

  9. Advantages and limitations of remotely operated sea floor drill rigs

    Science.gov (United States)

    Freudenthal, T.; Smith, D. J.; Wefer, G.

    2009-04-01

    A variety of research targets in marine sciences including the investigation of gas hydrates, slope stability, alteration of oceanic crust, ore formation and palaeoclimate can be addressed by shallow drilling. However, drill ships are mostly used for deep drillings, both because the effort of building up a drill string from a drill ship to the deep sea floor is tremendous and control on drill bit pressure from a movable platform and a vibrating drill string is poor especially in the upper hundred meters. During the last decade a variety of remotely operated drill rigs have been developed, that are deployed on the sea bed and operated from standard research vessels. These developments include the BMS (Bentic Multicoring System, developed by Williamson and Associates, operated by the Japanese Mining Agency), the PROD (Portable Remotely Operated Drill, developed and operated by Benthic Geotech), the Rockdrill 2 (developed and operated by the British geological Survey) and the MeBo (German abbreviation for sea floor drill rig, developed and operated by Marum, University of Bremen). These drill rigs reach drilling depths between 15 and 100 m. For shallow drillings remotely operated drill rigs are a cost effective alternative to the services of drill ships and have the major advantage that the drilling operations are performed from a stable platform independent of any ship movements due to waves, wind or currents. Sea floor drill rigs can be deployed both in shallow waters and the deep sea. A careful site survey is required before deploying the sea floor drill rig. Slope gradient, small scale topography and soil strength are important factors when planning the deployment. The choice of drill bits and core catcher depend on the expected geology. The required drill tools are stored on one or two magazines on the drill rig. The MeBo is the only remotely operated drill rig world wide that can use wire line coring technique. This method is much faster than conventional

  10. Slant rigs offer big payoffs in shallow drilling

    International Nuclear Information System (INIS)

    Smith, J.; Edwards, B.

    1992-01-01

    Slant hole drilling technology can result in considerable savings over conventionally drilled deviated holes because mud motors and deviation control with measurement while drilling tools are usually unnecessary. The benefits of using slant hole rigs for development drilling improve after the bit walk tendencies and the correct bottom hole assemblies have been determined for a particular area. This article discusses three recent drilling operations that successfully used slant drilling technology on land-based projects: drilling for heavy oil in Alberta, drilling for gas in Alberta, and drilling a river crossing for a gas pipeline in British Columbia. These examples demonstrate the flexibility of slant drilling technology

  11. Ergonomic exposure on a drilling rig

    DEFF Research Database (Denmark)

    Jensen, Carsten; Jensen, Chris

    . In a relatively old study on American drilling rigs it was indicated that lower back problems was a frequent cause of absence (Clemmer et al. 1991). Most of the incidents causing lower back injuries were associated with heavy lifting or pushing/pulling objects by roustabouts, floorhands, derrickmen and welders......, but for some of the most frequent problems, such as musculoskeletal problems, it is difficult to determine whether the causes are work‐related or not. As manual handling (lifting, pushing, etc.) in awkward body postures increase the risk of developing musculoskeletal disorders, it should be expected that work......‐related health problems contribute to sickness absence in the offshore industry, if these working postures are common. However, also work‐related psychosocial factors, personal factors and other factors may contribute to the development of lower back disorders, which often have a multifactorial background...

  12. A new generation drilling rig: hydraulically powered and computer controlled

    Energy Technology Data Exchange (ETDEWEB)

    Laurent, M.; Angman, P.; Oveson, D. [Tesco Corp., Calgary, AB, (Canada)

    1999-11-01

    Development, testing and operation of a new generation of hydraulically powered and computer controlled drilling rig that incorporates a number of features that enhance functionality and productivity, is described. The rig features modular construction, a large heated common drilling machinery room, permanently-mounted draw works which, along with the permanently installed top drive, significantly reduces rig-up/rig-down time. Also featured are closed and open hydraulic systems and a unique hydraulic distribution manifold. All functions are controlled through a programmable logic controller (PLC), providing almost unlimited interlocks and calculations to increase rig safety and efficiency. Simplified diagnostic routines, remote monitoring and troubleshooting are also part of the system. To date, two rigs are in operation. Performance of both rigs has been rated as `very good`. Little or no operational problems have been experienced; downtime has averaged 0.61 per cent since August 1998 when the the first of the two rigs went into operation. The most important future application for this rig is for use with the casing drilling process which eliminates the need for drill pipe and tripping. It also reduces the drilling time lost due to unscheduled events such as reaming, fishing and taking kicks while tripping. 1 tab., 6 figs.

  13. Index method for analyzing cost effectiveness of drilling rigs

    Energy Technology Data Exchange (ETDEWEB)

    Batura, N P; Bocharov, V V

    1978-01-01

    The method for a complete analysis of the factors determining cost effectiveness of a drilling rig fleet is examined. The system of calculating production indexes from statistical reports is relatively simple and is not difficult to use for production organizations. The analytical results may be used to develop actual measures used to increase cost effectiveness of drilling operations.

  14. 21. century drilling rigs -- Tesco introduces new modular design

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1998-10-01

    Development of a modular, hydraulic, self-elevating drilling rig, dubbed the `21. century drilling rig` was announced by the Tesco Corporation. The rig equipment is housed in 8 by 20 by 8.5 feet high sea containers that can be handled by a 20-ton oilfield picker. These containers, weighing about 15,000 to 20,000 pounds on average, eliminate the need for heavy and bulky standard oilfield skid buildings, besides avoiding costly over-width and over-weight permits. The containers can be easily shipped around the world at a fraction of the cost of shipping standard oilfield skid buildings. Time for shipping on land is comparable to conventional rigs, but with the added advantage of smaller and lighter loads, promising fewer transportation problems during spring breakup. Tesco also designed and built an 85-foot long, triple-axle, 24-wheel catwalk trailer to transport the top drive, drawworks and double telescoping mast as one unit. Another novel characteristic of this unit is that the hydraulic system is capable of selectable distribution of power to the main functions such as the top drive, drawworks, or mud pump, similar to the electric SCR rig. The rig also features a computerized control system managed by programmable logic controllers. The split crown and split block to facilitate wireline work, are other innovative features worthy of note.

  15. Technical and economic evaluation of selected compact drill rigs for drilling 10,000 foot geothermal production wells

    Energy Technology Data Exchange (ETDEWEB)

    Huttrer, G.W. [Geothermal Management Company, Inc., Frisco, CO (United States)

    1997-11-01

    This report summarizes the investigation and evaluation of several {open_quotes}compact{close_quotes} drill rigs which could be used for drilling geothermal production wells. Use of these smaller rigs would save money by reducing mobilization costs, fuel consumption, crew sizes, and environmental impact. Advantages and disadvantages of currently-manufactured rigs are identified, and desirable characteristics for the {open_quotes}ideal{close_quotes} compact rig are defined. The report includes a detailed cost estimate of a specific rig, and an evaluation of the cost/benefit ratio of using this rig. Industry contacts for further information are given.

  16. Articulated elevator links for top drive drill rig

    Energy Technology Data Exchange (ETDEWEB)

    Krasnov, I.

    1988-12-27

    This patent describes for a drill rig having a derrick, a drive head assembly suspended in the derrick having a drive stem for connection to and for rotating a string of drill pipe, an improved means for connecting a stand of the drill pipe to the drive stem, comprising in combination: a pair of upper link sections, each pivotally suspended from the drive head assembly and having a lower end; a pair of lower link sections, each having an upper end pivotally connected to one of the lower ends of the upper link sections and each having a lower end; a set of elevators mounted to lower ends of the lower link sections for clamping about the stand of drill pipe; upper lifting means connected between the upper link sections and the drive head assembly for pivoting the upper link sections relative to the drive head assembly; and lowering lifting means connected between the upper and lower link sections for pivoting the lower link sections relative to the upper link sections for lifting the elevators upward relative to the drive head assembly to engage the stand of drill pipe with the drive stem. The patent also describes a method for connecting a stand of the drill pipe to the drive stem.

  17. Lapland longspur mortality at an oil well drilling rig site, Laramie County, Wyoming

    Science.gov (United States)

    Ramirez, Pedro; Dickerson, Kimberly K.; Lindstrom, Jim; Meteyer, Carol U.; Darrah, Scott

    2015-01-01

    Two hundred fifty-one Lapland longspur (Calcarius lapponicus) carcasses were recovered around an oil well drilling rig in Laramie County, Wyoming, USA, on December 13–14, 2010, apparent victims of a winter storm and “light entrapment” from the lights on the drilling rig during foggy conditions. We found Lapland longspur carcasses distributed around the drilling rig from 33 m to 171 m. Investigators did not find evidence of bird carcasses on the drilling rig deck or equipment immediately adjacent to the drilling rig. We ruled out chemical toxins and disease as a cause of mortality. Weather conditions, the circular depositional pattern of carcasses around the drilling rig, and bird necropsy results led investigators to conclude that the Lapland longspur mortality was the result of the migrating birds entering the area illuminated by the drilling rig lights in freezing fog and the birds repeatedly circling the drilling rig until they fell to the ground in exhaustion and dying from subsequent trauma. Further research is needed to understand how to most effectively adjust lighting of onshore drilling rigs to reduce the potential for avian light entrapment. Published 2014. This article is a U.S. Government work and is in the public domain in the USA.

  18. A Universal Rig for Supporting Large Hammer Drills: Reduced Injury Risk and Improved Productivity.

    Science.gov (United States)

    Rempel, David; Barr, Alan

    2015-10-01

    Drilling holes into concrete with heavy hammer and rock drills is one of the most physically demanding tasks performed in commercial construction and poses risks for musculoskeletal disorders, noise induced hearing loss, hand arm vibration syndrome and silicosis. The aim of this study was to (1) use a participatory process to develop a rig to support pneumatic rock drills or large electric hammer drills in order to reduce the health risks and (2) evaluate the usability of the rig. Seven prototype rigs for supporting large hammer drills were developed and modified with feedback from commercial contractors and construction workers. The final design was evaluated by laborers and electricians (N=29) who performed their usual concrete drilling with the usual method and the new rig. Subjective regional fatigue was significantly less in the neck, shoulders, hands and arms, and lower back) when using the universal rig compared to the usual manual method. Usability ratings for the rig were significantly better than the usual method on stability, control, drilling, accuracy, and vibration. Drilling time was reduced by approximately 50% with the rig. Commercial construction contractors, laborers and electricians who use large hammer drills for drilling many holes should consider using such a rig to prevent musculoskeletal disorders, fatigue, and silicosis.

  19. Exergetic analysis of autonomous power complex for drilling rig

    Science.gov (United States)

    Lebedev, V. A.; Karabuta, V. S.

    2017-10-01

    The article considers the issue of increasing the energy efficiency of power equipment of the drilling rig. At present diverse types of power plants are used in power supply systems. When designing and choosing a power plant, one of the main criteria is its energy efficiency. The main indicator in this case is the effective efficiency factor calculated by the method of thermal balances. In the article, it is suggested to use the exergy method to determine energy efficiency, which allows to perform estimations of the thermodynamic perfection degree of the system by the example of a gas turbine plant: relative estimation (exergetic efficiency factor) and an absolute estimation. An exergetic analysis of the gas turbine plant operating in a simple scheme was carried out using the program WaterSteamPro. Exergy losses in equipment elements are calculated.

  20. Speeding up : new Atlas Copco rig meant to cut non-drilling time

    Energy Technology Data Exchange (ETDEWEB)

    Roche, P.

    2009-06-15

    Automation has significantly reduced the time needed to drill shallow to medium-depth wells. The time it takes for a drill to reach the production zone is decreasing because newly developed hydraulic systems are able to maintain a constant pace. However, a great deal of time is still consumed by demobilization, transportation and setting up to drill the next well. Atlas Copco Drilling Solutions, a Swedish-based global maker of industrial equipment such as mining and mineral exploration rigs, designed a new Predator drilling system that consists of a mobile rig, a substructure and a pipe-handling skate. The Predator drilling system reduces non-drilling time and the associated costs. This article described the design of this new drilling system with particular reference to how it combines the mobile rig, the substructure and the pipe-handling skate into a three-load package. In order to reduce rig weight and improve mobility, the system is designed so that the table, master bushing, hydraulic slips and iron roughneck are part of the substructure that travel together. The rig has a working hook load capacity of 200,000 pounds, translating into a nominal depth capacity of 8,000 to 10,000 feet. The article also described the mounting of the rig, maneuverability, hydraulic control, and pipe-handling safety. Its various components were also described. 1 ref., 1 fig.

  1. Scientific Drilling with the Sea Floor Drill Rig MeBo

    Directory of Open Access Journals (Sweden)

    Gerold Wefer

    2007-09-01

    Full Text Available In March 2007 the sea floor drill rig MeBo (short for “Meeresboden-Bohrgerät”, ‘sea floor drill rig’ in German returned from a 17-day scientific cruise with the new German research vessel Maria S. Merian. Four sites between 350 m and 1700 m water depth were sampled at the continental slope off Morocco by push coring and rotary drilling. Up to 41.5-m-long sediment cores were recovered from Miocene, Pliocene, and Pleistocene marls. MeBo bridges the gapbetween conventional sampling methods from standard multipurpose research vessels (gravity corer, piston corer, dredges and drill ships. Most bigger research vessels will be able to support deployment of the MeBo. Since the drill system can be easily transported within 20-ft containers, worldwide operation from vessels of opportunity is possible. With the MeBo a new system is available for marine geosciences that allows the recovery of high quality samples from soft sediments and hard rock from the deep sea withoutrelying on the services of expensive drilling vessels.

  2. Stochastic programming of drilling rigs supplies; Programacao estocastica de suprimentos de sondas

    Energy Technology Data Exchange (ETDEWEB)

    Vieira, Bruno Ferreira; Ferreira Filho, Virgilio Jose Martins [Coordenacao dos Programas de Pos-Graduacao de Engenharia (COPPE/UFRJ), RJ (Brazil)

    2012-07-01

    The goal of this work is to use techniques of stochastic programming to reduce logistic costs regarding offshore drilling rigs. This theme is of great interest to Brazilian oil industry since there is an increasing number of wells that need to be perforated so that Brazilian oil production can reach its expected growth over the next ten years (PETROBRAS in particular has an ambitious strategy in this respect). Proper treatment of the uncertainties involved in the deliveries of supplies to offshore drilling rigs is essential, namely, these uncertainties need to be included in the models used in logistic models. Delays in the deliveries of products such as chemicals, perforation fluids and tubes may force drilling rigs to stop their operations what highly increases costs. The daily hiring rates of drilling rigs represent the highest cost in the perforation and completion of a well. (author)

  3. The economics and related factors involved in the replacement of land drilling rigs

    International Nuclear Information System (INIS)

    Holm, D.W.

    1992-01-01

    The principal purpose of this paper is to evaluate the construction cost of a medium depth land rig made from all NEW components and the resulting effect on drilling contractor economics. This evaluation will include an inventory of the proposed NEW rig, with a comparison of the costs of a similar rig built in 1981-1982, and a similar rig built from existing UNUSED equipment in manufacturer's current inventory. The paper discusses the problems encountered in obtaining quotations for NEW equipment from manufacturers, the current attitudes of equipment manufacturers, the potential for problems from the use of existing UNUSED equipment in manufacturers inventory, and finally the possible effect on the day rates needed to justify the construction of NEW land rigs. Probable reasons for the attitudes of the manufacturing industry and alternatives for the drilling contractor will be reviewed

  4. Practical calibration of design data to technical capabilities of horizontal directional drilling rig

    Science.gov (United States)

    Toropov, S. Yu; Toropov, V. S.

    2018-05-01

    In order to design more accurately trenchless pipeline passages, a technique has been developed for calculating the passage profile, based on specific parameters of the horizontal directional drilling rig, including the range of possible drilling angles and a list of compatible drill pipe sets. The algorithm for calculating the parameters of the trenchless passage profile is shown in the paper. This algorithm is based on taking into account the features of HDD technology, namely, three different stages of production. The authors take into account that the passage profile is formed at the first stage of passage construction, that is, when drilling a pilot well. The algorithm involves calculating the profile by taking into account parameters of the drill pipes used and angles of their deviation relative to each other during the pilot drilling. This approach allows us to unambiguously calibrate the designed profile for the HDD rig capabilities and the auxiliary and navigation equipment used in the construction process.

  5. Semisubmersible rigs attractive for tender-assisted drilling

    Energy Technology Data Exchange (ETDEWEB)

    Tranter, P. (Sedco Forex, Aberdeen (United Kingdom))

    1994-09-19

    Tender-assisted drilling (TAD) involves the use of tender support vessel (TSV) during the drilling phase of platform development to provide drilling utilities to the platform-mounted drilling package. The TSV provides facilities such as mud mixing, storage, pumping, bulk storage, hotel accommodations, and power. Thus, the platform topsides and jacket weight and size can be smaller and less expensive. The paper discusses the advantages and disadvantages of TAD, then describes the TAD vessel, semisubmersible, platform cost savings, accommodations, drilling and workovers, and field experience.

  6. Developmental test report, assessment of XT-70E percussion drill rig operation in tank farms

    International Nuclear Information System (INIS)

    Dougherty, L.F.

    1996-01-01

    The following report documents the testing of the XT-70E percussion drill rig for use in the 241-SX Tank Farm. The test is necessary to support evaluation of the safety and authorization level of the proposed activity of installing up to three new drywells in the 241- SX Tank Farm. The proposed activity plans to install drywells by percussion drilling 7 inch O.D./6 inch I.D. pipe in close proximity of underground storage tanks and associated equipment. The load transmitted from the drill rig's percussion hammer through the ground to the tank structure and equipment is not known and therefore testing is required to ensure the activity is safe and authorized

  7. A study of the modes of advancement of multiple drilling rigs and the influence of the inertial effects on the efficiency of the towers

    Energy Technology Data Exchange (ETDEWEB)

    Karapetyan, K.V.

    1979-01-01

    Studied in a mathematical model with the use of experimental data obtained through a method of measurement filming is the process of advancement of a drilling rig and the inertial actions on the drilling equipment are determined. It is shown that the tower type rigs, the VM-41 may be safely advanced along with the package of drilling stands. For mast rigs, suitable for conditions of multiple drilling, the creation of special drive mechanisms with high travel smoothness is recommended.

  8. Studi Pengaruh Gerak Semi-submersible Drilling Rig dengan Variasi Pre-tension Mooring Line terhadap Keamanan Drilling Riser

    Directory of Open Access Journals (Sweden)

    Arda Arda

    2012-09-01

    Full Text Available Analisis terhadap sistem tambat pada anjungan pengeboran semi-submersible drilling rig perlu dilakukan sebelum dilakukannya operasi di lapangan untuk mengetahui perencanaan sistem tambat yang tepat dan aman. Dalam penelitian ini dilakukan analisa perilaku gerak semi-submersible dengan variasi pre-tension mooring line untuk mengetahui berapa besar pre-tension minimal yang harus digunakan agar operasi pengeboran di lingkungan laut Natuna dapat berjalan dengan aman. Variasi pre-tension yang digunakan adalah sebesar 400kN-2000kN dengan penambahan sebesar 400kN. Karakteristik gerakan semi-submersible diprediksi dengan menghitung RAO free floating dengan pemodelan numerik dalam domain frekuensi. Kemudian dilakukan analisa simulasi sistem lengkap (platform, mooring dan drilling riser dengan pemodelan numerik dalam domain waktu. Hasil yang didapat yakni nilai maksimum tegangan mooring line memenuhi batas kriteria API-RP2SK untuk semua variasi pre-tension dengan safety factor terkecil 2.44. Sudut flex joint drilling riser yang terjadi melewati batas kriteria API-RP16Q pada pre-tension 400kN-800kN yang mencapai 6.20 untuk sudut maksimum dan 4.80 untuk sudut rata-rata. Tegangan von Mises yang terjadi pada drilling riser melebihi kriteria API-RP16Q pada pre-tension 400kN-1200kN karena nilainya mencapai 369 MPa (0.82 yield stress.

  9. Injury Rates on New and Old Technology Oil and Gas Rigs Operated by the Largest United States Onshore Drilling Contractor

    Science.gov (United States)

    Blackley, David J.; Retzer, Kyla D.; Hubler, Warren G.; Hill, Ryan D.; Laney, A. Scott

    2015-01-01

    Background Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. Methods We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003–2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Results Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. Conclusions For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. PMID:25164118

  10. Injury rates on new and old technology oil and gas rigs operated by the largest United States onshore drilling contractor.

    Science.gov (United States)

    Blackley, David J; Retzer, Kyla D; Hubler, Warren G; Hill, Ryan D; Laney, A Scott

    2014-10-01

    Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003-2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. © 2014 Wiley Periodicals, Inc.

  11. Sandia's Geothermal Advanced Drill Rig Instrumentation Assists Critical Oil and Gas Drilling Operation

    International Nuclear Information System (INIS)

    Staller, George E.; Whitlow, Gary

    1999-01-01

    On November 23, 1998, an 18,000-foot-deep wild-cat natural gas well being drilled near Bakersfield, CA blew out and caught fire. All attempts to kill this well failed, and the well continues to flow under limited control, producing large volumes of natural gas, salt water, and some oil. The oil and some of the water is being separated and trucked off site, and the remaining gas and water is being burned at the well head. A relief well is being drilled approximately one-quarter mile away in an attempt to intercept the first well. If the relief well is successful, it will be used to cement in and kill the first well. Epoch Wellsite Services, Inc., the mud-logging company for the initial well and the relief well, requested Sandia's rolling float meter (RFM) for these critical drilling operations. The RFM is being used to measure the mud outflow rate and detect kicks while drilling the relief well, which will undoubtedly encounter reservoir conditions similar to those responsible for the blow out. Based on its prior experience with the RFM, Epoch believes that it is the only instrument capable of providing the level of accuracy and response to mudflow needed to quickly detect kicks and minimize the risk of a blowout on this second critical well. In response to the urgent request from industry, Sandia and Epoch technicians installed the RFM on the relief well return line, and completed its initial calibration. The data from the RFM is displayed in real-time for the driller, the companyman, and the toolpusher via Epochs RIGWATCH Drilling Instmmentation System. The RFM has already detected several small kicks while drilling toward the annulus of the blown out well. A conventional paddle meter is located downstream of the RFM to provide redundancy and the opportunity to compare the two meters in an actual drilling operation, The relief well is nearing 14,000 feet deep, targeting an intercept of the first well near 17,600 feet. The relief well is expected to be completed in

  12. A method for assemblying support columns for a floating drill rig

    Energy Technology Data Exchange (ETDEWEB)

    Sheremetyev, D N; Kutnyakov, M I; Lobayev, S F

    1984-01-01

    The patent covers a method for assembling support columns for a floating drill rig, in which the first section of the support column is fed into a lifting and lowering device of the floating drill rig from above, while the subsequent sections are fed by means of a ballasted pontoon and winches from the bottom side into a notch in the body of the platform. In order to simplify assembly by increasing the precision of orientation when feeding the sections of the support columns into the notch in the body of the platform, guide retainers are installed in the first section of the support column, rope links are passed through them, some ends of which are attached to the drums of the cited winches, while the others are attached to the section fed from the bottom. Then the pontoon with the section fed from the bottom of the platform is balanced on the rope links, taking up the slack by means of the referenced winches, after which the lifting and lowering devices is used to lower the first section of the support column until it interfaces with the section fed from the bottom. The rope links are locked in the guide retainers and the abutted sections are lifted to the assembly zone by means of the lift and lowering device.

  13. A Thrust Allocation Method for Efficient Dynamic Positioning of a Semisubmersible Drilling Rig Based on the Hybrid Optimization Algorithm

    Directory of Open Access Journals (Sweden)

    Luman Zhao

    2015-01-01

    Full Text Available A thrust allocation method was proposed based on a hybrid optimization algorithm to efficiently and dynamically position a semisubmersible drilling rig. That is, the thrust allocation was optimized to produce the generalized forces and moment required while at the same time minimizing the total power consumption under the premise that forbidden zones should be taken into account. An optimization problem was mathematically formulated to provide the optimal thrust allocation by introducing the corresponding design variables, objective function, and constraints. A hybrid optimization algorithm consisting of a genetic algorithm and a sequential quadratic programming (SQP algorithm was selected and used to solve this problem. The proposed method was evaluated by applying it to a thrust allocation problem for a semisubmersible drilling rig. The results indicate that the proposed method can be used as part of a cost-effective strategy for thrust allocation of the rig.

  14. 30 CFR 250.405 - What are the safety requirements for diesel engines used on a drilling rig?

    Science.gov (United States)

    2010-07-01

    ... engines used on a drilling rig? You must equip each diesel engine with an air take device to shut down the... must equip the engine with an automatic shutdown device; (b) For a diesel engine that is continuously manned, you may equip the engine with either an automatic or remote manual air intake shutdown device; (c...

  15. Rig supervisors

    International Nuclear Information System (INIS)

    Nordt, D.P.; Stone, M.S.

    1992-01-01

    This paper helps prepare the inexperienced rig supervisor to manage a drilling operation. It outlines operational-knowledge requirements and optimization concepts for improving drilling performance and lowering drilling costs. It gives guidelines on safety and environmental responsibilities, and provides recommendations on work tools, leadership, and communication

  16. An inexpensive and portable drill rig for bedrock groundwater studies in headwater catchments

    Science.gov (United States)

    C. Gabrielli; J.J. McDonnell

    2011-01-01

    Bedrock groundwater dynamics in headwater catchments are poorly understood and poorly characterized. Here, we present an inexpensive and portable bedrock drilling system designed for use in remote locations. Our system is capable of drilling bedrock wells up to 11 m deep and 38 mm in diameter in a wide range of bedrock types. The drill consists of a lawn mower engine...

  17. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  18. Understanding Rig Rates

    OpenAIRE

    Petter Osmundsen; Knut Einar Rosendahl; Terje Skjerpen

    2013-01-01

    We examine the largest cost component in offshore development projects, drilling rates, which have been high over the last years. To our knowledge, rig rates have not been analysed empirically before in the economic literature. By econometric analysis we examine the effects on Gulf of Mexico rig rates of gas and oil prices, rig capacity utilization, contract length and lead time, and rig specific characteristics. Having access to a unique data set containing contract information, we are able ...

  19. Advancing rig design: latest rig technologies improving efficiency and safety

    Energy Technology Data Exchange (ETDEWEB)

    Greenaway, R.

    1997-12-01

    Recent advances in drilling rig technologies that improve the ways for finding oil and natural gas, and are also solving some safety and transportation problems, have been reviewed. The coiled tubing drilling rig developed by joint venture TransOcean Ensign Drilling Technology was one of the innovations described. It is able to run a three-and-a-quarter inch coiled tubing, the only system capable of doing this in a land-based application. Tesco Corporation`s new casing drilling rig, which is expected to lower the cost of moving the rig, and Brinkerhoff Drilling`s new generation modular (NGM)-rig, claimed to be the most mobile rig in North America, are other new developments worthy of note. Tesco`s casing drilling rig has the potential to reduce drilling costs by as much as 30 to 40 per cent, while the NGM-rig could reduce rig mobilization time by 50 to 80 per cent, and the number of wells drilled by the same rig could increase by 20 per cent, due to the NGM-rig`s versatility and flexibility.

  20. IT that works on the rig floor : computers on drilling rigs need to be certified and built with features that can handle the environment

    Energy Technology Data Exchange (ETDEWEB)

    Balsaver, N.

    2010-07-15

    This article discussed the design challenges faced in developing hazardous-location computers for rig-floor use and other recently introduced products from Laversab. Rig-floor computers must not only be certified as Zone-1 or Zone-2 compliant but must also have features that make them work dependably in an extreme environment, including a wide operating temperature range, an ability to withstand severe vibration, immunity to salt fog, a viewable display in bright daylight, networking capability, USB and serial interfaces, and touch screens. Size and weight has been a major obstacle, but recent innovations have made Zone-1 computers intrinsically safe (IS), making them much smaller and lighter. Wireless networking eliminates the need for installing copper and fibre-optic cabling, but the wireless interface must be strong enough to overcome the many obstructions that are typically present on oil rigs. The computer models described, including a Driller's Display designed to be IS for Zone-1 applications and a Directional MWD Surface System designed for Zone-2 applications, provide solutions to the challenges of a working rig-floor environment. 3 figs.

  1. Oil drilling rig diesel power-plant fuel efficiency improvement potentials through rule-based generator scheduling and utilization of battery energy storage system

    International Nuclear Information System (INIS)

    Pavković, Danijel; Sedić, Almir; Guzović, Zvonimir

    2016-01-01

    Highlights: • Isolated oil drilling rig microgrid power flows are analyzed over 30 days. • Rule-based diesel generator scheduling is proposed to reduce fuel consumption. • A battery energy storage is parameterized and used for peak load leveling. • The effectiveness of proposed hybrid microgrid is verified by simulations. • Return-of-investment might be expected within 20% of battery system lifetime. - Abstract: This paper presents the development of a rule-based energy management control strategy suitable for isolated diesel power-plants equipped with a battery energy storage system for peak load shaving. The proposed control strategy includes the generator scheduling strategy and peak load leveling scheme based on current microgrid active and reactive power requirements. In order to investigate the potentials for fuel expenditure reduction, 30 days-worth of microgrid power flow data has been collected on an isolated land-based oil drilling rig powered by a diesel generator power-plant, characterized by highly-variable active and reactive load profiles due to intermittent engagements and disengagements of high-power electric machinery such as top-drive, draw-works and mud-pump motors. The analysis has indicated that by avoiding the low-power operation of individual generators and by providing the peak power requirements (peak shaving) from a dedicated energy storage system, the power-plant fuel efficiency may be notably improved. An averaged power flow simulation model has been built, comprising the proposed rule-based power flow control strategy and the averaged model of a suitably sized battery energy storage system equipped with grid-tied power converter and state-of-charge control system. The effectiveness of the proposed rule-based strategy has been evaluated by means of computer simulation analysis based on drilling rig microgrid active and reactive power data recorded during the 30 day period. The analysis has indicated that fuel consumption of

  2. Mini-CORK observatories using the MeBo seafloor drill rig - a new development for long-term data acquisition and sampling in shallow boreholes

    Science.gov (United States)

    Kopf, A.; Freudenthal, T.; Ratmeyer, V.; Bergenthal, M.; Renken, J.; Zabel, M.; Wefer, G.

    2011-12-01

    State of the art technology for long-term monitoring of fluid migration within the sea floor is the sealing of a borehole with a Circulation Obviation Retrofit Kit (CORK) after sensor installation and/or fluid sampling devices within the drill string. However, the combined used of a drilling vessels and a remotely operated drilling (ROV) required for a CORK installation in the deep sea is a costly exercise that limits the number of monitoring stations installed. Robotic sea floor drill rigs are a cost effective alternative for shallow drillings down to 50-100 m below sea floor. Here we present a Mini-CORK system that is developed for installation with the sea floor drill rig MeBo. This rig was developed at MARUM Research Centre, University of Bremen in 2005 and can sample the sea floor in water depths up to 2000 m. The MeBo is deployed on the seabed and remotely controlled from the vessel. All required drill tools for wire-line core drilling down to 70 m below sea floor are stored on two rotating magazines and can be loaded below the top drive drill head for assembling the drill string. For one of the upcoming cruises with RV Sonne offshore Japan (Nankai Trough accretionary prism), MeBo will be used for the first time to place observatories. Two different designs have been developed. The first, relatively simple long-term device resembles a MeBo drill rod in its geometry, and contains a pressure and temperature transducer in the borehole plus an identical pair of transducers for seafloor reference. The device also contains a data logger, battery unit, and an acoustic modem so that data can be downloaded at any time from a ship of opportunity. The key element at the base of the observatory rod is a seal at the conical thread to separate the borehole hydraulically from the overlying water body. It is realized by an adapter, which also contains a hotstab hydraulic connection and an electrical connection. The second observatory device is a seafloor unit, which replaces

  3. InnovaRig, a new drilling concept for research drilling projects of GeoForschungsZentrum (GFZ) Potsdam; InnovaRig - ein neues Bohranlagenkonzept fuer Forschungsbohrungen des GeoForschungsZentrum (GFZ) Potsdam

    Energy Technology Data Exchange (ETDEWEB)

    Wohlgemuth, L.; Prevedel, B. [GFZ Potsdam (Germany); Binder, J. [Herrenknecht Vertical GmbH, Schwanau (Germany); Mueller Ruhe, W. [H. Anger' s Soehne mbH, Hessisch Lichtenau (Germany); Wundes, B. [World Wide Drilling Consultants, Gladbeck (Germany)

    2007-09-13

    The world-wide experience in scientific drilling projects gained by GFZ has shown that there is no commercial drilling system that meets all technical requirements of either geoscientific or geotechnical projects. Research must therefore be done on a flexible and economical drilling system for special applications. GFZ Potsdam is therefore developing an optimized drilling system for a depth of up to 5000 m, in a joint R + D project with the industrial partners Herrenknecht-Vertical GmbH, a subsidiary of Herrenknecht AG (Schwanau), and H. Anger's Soehne Bohr- und Brunnenbaugesellschaft mbH (Hessisch-Lichtenau). (orig.)

  4. Design and deployment of autoclave pressure vessels for the portable deep-sea drill rig MeBo (Meeresboden-Bohrgerät)

    Science.gov (United States)

    Pape, Thomas; Hohnberg, Hans-Jürgen; Wunsch, David; Anders, Erik; Freudenthal, Tim; Huhn, Katrin; Bohrmann, Gerhard

    2017-11-01

    Pressure barrels for sampling and preservation of submarine sediments under in situ pressure with the robotic sea-floor drill rig MeBo (Meeresboden-Bohrgerät) housed at the MARUM (Bremen, Germany) were developed. Deployments of the so-called MDP (MeBo pressure vessel) during two offshore expeditions off New Zealand and off Spitsbergen, Norway, resulted in the recovery of sediment cores with pressure stages equaling in situ hydrostatic pressure. While initially designed for the quantification of gas and gas-hydrate contents in submarine sediments, the MDP also allows for analysis of the sediments under in situ pressure with methods typically applied by researchers from other scientific fields (geotechnics, sedimentology, microbiology, etc.). Here we report on the design and operational procedure of the MDP and demonstrate full functionality by presenting the first results from pressure-core degassing and molecular gas analysis.

  5. Innovative technology for a cost-effective land rig

    Energy Technology Data Exchange (ETDEWEB)

    Mehra, S.; Bryce, T.

    1996-05-01

    Sedco Forex has recently completed a new land drilling rig, currently deployed in Gabon, that integrates well construction activities with multiskilling to create cost savings across the board in drilling operations. Historically, operators have produced a comprehensive tender package specifying strictly the type and size of individual rig components and the number of personnel required to drill. In this case, the drilling contractor provides a fit-for-purpose rig, consistent with field location, well profile, operator`s priorities, and local constraints.

  6. Innovative technology for a cost-effective land rig

    International Nuclear Information System (INIS)

    Mehra, S.; Bryce, T.

    1996-01-01

    Sedco Forex has recently completed a new land drilling rig, currently deployed in Gabon, that integrates well construction activities with multiskilling to create cost savings across the board in drilling operations. Historically, operators have produced a comprehensive tender package specifying strictly the type and size of individual rig components and the number of personnel required to drill. In this case, the drilling contractor provides a fit-for-purpose rig, consistent with field location, well profile, operator's priorities, and local constraints

  7. Drilling trends in the nineties

    International Nuclear Information System (INIS)

    1993-01-01

    At a conference on various aspects of well drilling in the 1990s, papers were presented on drilling waste management, well completion and workovers, drilling fluids, drilling rig equipment and design, drilling mechanics, drill stem testing and materials, cementing, business management, health and safety, environmental issues, and directional drilling technology. Separate abstracts have been prepared for 46 papers from this conference

  8. The mobile rig industry

    International Nuclear Information System (INIS)

    Karlsen, J.K.

    1992-08-01

    This study is part of the project ''A competitive Norway'', based on the theories and methods presented in the book ''The competitive advantage of nations'', by Michael E. Porter. The rig market may be segmented according to the type of service, the geographical market and the type of equipment. The focus of the report is exploration and appraisal drilling using jackup rigs and semi-submersible rigs in the Northwestern European market. Market shares of Norwegian, other European and US suppliers in the jackup and semi-submerisible market segments on the Norwegian continental shelf and the entire Northwestern market are presented. The main driving force behind the rig demand is the price of oil, but technological trends and changes in relative importance of the various geographical markets are also important. The industry is fairly fragmented on the supplier side, while the oil companies as customers have substantial bargaining power. There are high exit barriers because of the high capital intensity of the business. Combined with a highly volatile demand, this forces the industry through cycles of low capacity utilization and depressed rig day rates. 8 refs., 19 figs., 2 tabs

  9. Casing drilling

    Energy Technology Data Exchange (ETDEWEB)

    Heenan, D. [Tesco Corp., Calgary, AB (Canada)

    2003-07-01

    This paper reviewed the experience that Tesco has gained by drilling several wells using only casings as the drill stem. Tesco has manufactured a mobile and compact hydraulic drilling rig called the Casing Drilling {sup TM} system. The system could be very effective and efficient for exploration and development of coalbed methane (CBM) reserves which typically require extensive coring. Continuous coring while drilling ahead, along wire line retrieval, can offer time savings and quick core recovery of large diameter core which is typically required for exploration core desorption tests. The proposed system may also have the potential to core or drill typically tight gas sands or underbalanced wells with air or foam. This would reduce drilling fluid damage while simultaneously finding gas. Compared to conventional drill pipes, Casing Drilling {sup TM} could also be effective with water production from shallow sands because of the smaller annual clearance which requires less air volumes to lift any produced water. 9 figs.

  10. 40th annual Reed rig census

    International Nuclear Information System (INIS)

    Fitts, R.L.; Stokes, T.A.

    1992-01-01

    This paper reports that declines characterize the 1992 rig census-in the number of available drilling rigs, in the number of active rigs, in rig utilization rate, in the number of rig owners and in industry optimism. The number of rotary rigs available for U.S. drilling fell by 255 units (11.3%) during the past 12 months, an attrition rate almost four times greater than in 1991. But despite the high attrition, only 59.7% of remaining rigs were working during the time the census was taken. Results of the 1992 census bring emphasis to an industry trend that became apparent in early 1991. The major oil companies, and many independents, continued their exodus form the U.S., and the remaining independents, which were hurt by low natural gas prices and unfavorable tax treatment of intangible drilling costs, were not able to pick u the drilling slack. Consequently, the past year has been disastrous for many U.S. drilling contractors, and the outlook for this industry segment remains bleak

  11. Field Demonstraton of Existing Microhole Coiled Tubing Rig (MCTR) Technology

    Energy Technology Data Exchange (ETDEWEB)

    Kent Perry; Samih Batarseh; Sheriff Gowelly; Thomas Hayes

    2006-05-09

    The performance of an advanced Microhole Coiled Tubing Rig (MCTR) has been measured in the field during the drilling of 25 test wells in the Niobrara formation of Western Kansas and Eastern Colorado. The coiled tubing (CT) rig designed, built and operated by Advanced Drilling Technologies (ADT), was documented in its performance by GTI staff in the course of drilling wells ranging in depth from 500 to nearly 3,000 feet. Access to well sites in the Niobrara for documenting CT rig performance was provided by Rosewood Resources of Arlington, VA. The ADT CT rig was selected for field performance evaluation because it is one of the most advanced commercial CT rig designs that demonstrate a high degree of process integration and ease of set-up and operation. Employing an information collection protocol, data was collected from the ADT CT rig during 25 drilling events that encompassed a wide range of depths and drilling conditions in the Niobrara. Information collected included time-function data, selected parametric information indicating CT rig operational conditions, staffing levels, and field observations of the CT rig in each phase of operation, from rig up to rig down. The data obtained in this field evaluation indicates that the ADT CT rig exhibited excellent performance in the drilling and completion of more than 25 wells in the Niobrara under varied drilling depths and formation conditions. In the majority of the 25 project well drilling events, ROP values ranged between 300 and 620 feet per hour. For all but the lowest 2 wells, ROP values averaged approximately 400 feet per hour, representing an excellent drilling capability. Most wells of depths between 500 and 2,000 feet were drilled at a total functional rig time of less than 16 hours; for wells as deep at 2,500 to 3,000 feet, the total rig time for the CT unit is usually well under one day. About 40-55 percent of the functional rig time is divided evenly between drilling and casing/cementing. The balance of

  12. One big rig, two valuable functions

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2004-11-01

    A hybrid coil tubing and conventional workover rig, tailor-made for conditions on Alaska's remote North Slope is described. The dual function rig, owned by BP Exploration, towers 142 feet above the barren Arctic tundra, and weighs between 1.5 and 2 million pounds, rests on eight enormous wheels that stand 11.5 feet tall and 3.5 feet wide, and is supported by 64 smaller tires in between. The rig includes the hybrid coiled tubing rig and a conventional workover rig; it exerts less than 100 pounds per square inch of pressure on the tender Arctic surface as it moves forward at a top speed of two miles per hour. It is considered by its developers as the next-step change in providing cost-effective access to reserves in the large, mature and remote oilfields such as those of Alaska's Prudhoe Bay. The rig is the product of cooperation between Schlumberger expertise in coiled tubing drilling and Nordic-Calista's know-how of jointed pipe operations and operating rigs in an Arctic environment. It is the first time in Prudhoe Bay, and probably in the world, that a coiled tubing unit was installed on a rig to do coiled-tubing sidetracks, i.e to drill a secondary wellbore away from the original wellbore. Since the first unit was commissioned in 1996, the rig has drilled 280 wells. Rig No. 2, much improved and commissioned in 2002, drilled about 30 wells to date. Unlike Rig No, 1, Rig No. 2 can change reels without a crane, and it has a hydraulic pipe skate that moves jointed pipe to and from the rig floor without human aid. The expectation is that using this rig it will be possible to do micro-hole exploration drilling on the North Slope (i.e. drilling a small surface hole with jointed pipe and then switch to coiled tubing), substantially cutting the cost of exploration.

  13. 39th annual Reed rig census

    International Nuclear Information System (INIS)

    Crowhurst, M.E.; Fitts, R.L.

    1991-01-01

    This paper reports on cutbacks in U.S. exploration and development drilling during the first half of 1991 which squeezed most of the optimism out of the drilling industry. Just how rough the year has been is underscored by the results of this year's rig census. The number of rotary rigs available for U.S. drilling declined by only 69 units (3%) during the past 12 months. But despite those withdrawals from competition, only 66% of the remaining rigs were working at the time the census was taken. Results of the 1991 census contrasted sharply with the stability and optimism that seemed apparent a year ago when 72% of the available rig fleet met the census definition of active. At that time, the mini-boom in horizontal drilling coupled with tax-credit- driven gas drilling led to a relatively high rig utilization rate and suggested that rig supply and demand might be close to an economically acceptable balance. However, it quickly became apparent in early 1991 that industry optimism was unjustified. Horizontal drilling began to drop and the lowest natural gas prices in 12 years triggered rapid declines in gas drilling. Although oil prices have been relatively stable and above $18 per bbl since January 1989, most major operators have concluded that a better return on investment can be had outside the U.S. and have drastically cut their domestic drilling budgets. These factors, combined with softened energy demand from the worldwide recession, further slowed U.S. drilling. The long awaited balance between rig supply and demand has seemingly slipped away. The 1991 Reed rig census describes an industry facing several more rough years. Details of this year's census include: The available U.S. fleet now stands at 2,251 rigs, down by 69 from the 2,320-unit total in 1990, and the lowest since 1976. Rigs meeting the census definition of active numbered 1,485, down 192 (11.4%) from the 1,677 active rigs counted a year earlier

  14. Technology trends, energy prices affect worldwide rig activity

    International Nuclear Information System (INIS)

    Rappold, K.

    1995-01-01

    The major worldwide offshore rig markets have improved slightly this year, while the onshore markets generally lagged slightly. Offshore rig utilization rates have remained strong worldwide, with some areas reaching nearly 100%. Total worldwide offshore rig (jack ups, semisubmersible, drillships, submersibles, and barges) utilization was about 86%. Offshore drilling activity is driven primarily by oil and natural gas price expectations. Natural gas prices tend to drive North American offshore drilling activity, including the shallow waters in the Gulf of Mexico. International offshore drilling activity and deepwater projects in the Gulf of Mexico are more closely tied to oil prices. The paper discusses US rig count, directional drilling activity, jack up rig demand, semisubmersibles demand, rig replacement costs, and new construction

  15. Rapid Development of Drilling Technology and Market of China

    Institute of Scientific and Technical Information of China (English)

    Wang Guanqing; Ni Rongfu

    1994-01-01

    @@ China's developing drilling market Now, CNPC is the owner of more than 1 000 rigs of large and medium size, including imported electric-drive rigs with 6 000 to 9 000 m drilling capacity, imported mechanical drive rigs with 5 000 to 6 000 m drilling capacity, imported mobile rigs with 1 500 to 3 000 m drilling capacity and a lot of home-made mechanical rigs with 2 000,3 200, 4 500 and 6 000m drilling capacity, which can meet the requirement of the domestic and foreign drilling market.

  16. New desegregated sandstone drilling techniques using self-lifting rigs; Novas tecnicas de perfuracao em arenitos desagregados com sondas auto-elevaveis

    Energy Technology Data Exchange (ETDEWEB)

    Machado, Adiel; Damasceno, Luiz Carlos [PETROBRAS, Macae, RJ (Brazil). Distrito de Perfuracao do Sudeste. Div. de Perfuracao; Muniz, Renato Passos [PETROBRAS, Macae, RJ (Brazil). Distrito de Perfuraco do Sudeste. Div. de Tecnicas de Perfuracao

    1990-12-31

    Through the use of a high viscosity asphalt based drilling fluid very significant results have been obtained, in areas where the soil surface layers are predominantly loose and sandy. The use of this type of fluid, together with adequate drilling parameters, turn out to be well succeeded, with a reduction or elimination of previous difficult problems. Consequentially, a substantial cost reduction has been achieved along with application possibilities in any part of the country that presents similar formation characteristics. It is also has been proved that the technique is perfectly executable, proving an efficient planning work regarding operational and supplies support. (author) 5 refs., 2 figs., 3 tabs.

  17. Rig it right! Maya animation rigging concepts

    CERN Document Server

    O'Hailey, Tina

    2013-01-01

    Rigging a character can be a complicated undertaking. Move from a bi-pedal character to a quad- or poly-pedal and, well, things just got real. Where do you begin? Unlike all of those button-pushing manuals out there, Rig it Right! breaks down rigging so that you can achieve a fundamental understanding of the concept, allowing you to rig more intuitively in your own work. Veteran animation professor Tina O'Hailey will get you up and rigging in a matter of hours with step-by-step tutorials covering multiple animation control types, connection methods, interactive skinning, Blend

  18. The art of rigging

    CERN Document Server

    Biddlecombe, George

    1990-01-01

    The best manual ever produced on rigging a sailing ship, based on extensively revised and updated 1848 edition prepared by Biddlecombe, Master in the Royal Navy. Complete definition of terms, on-shore operations, process of rigging ships, reeving the running rigging and bending sails, rigging brigs, yachts and small vessels, more. 17 plates.

  19. Customization creates more efficient, cleaner rigs

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2002-08-01

    Technological advances in drilling equipment are essential to improving efficiency in the oilpatch; getting the technological upper hand on the competition is no less important for drilling equipment manufacturers than for actors in other sectors of the industry. While off-the-shelf uniformity that reduces unit cost has been the trend in fabricating field gas compression modules, custom manufacturing has become very popular in the rig manufacturing sector. Examples from Crown Energy Technologies and Tesco Corporation, both of Calgary, Aecon Industrial's Edmonton operations, PCL Industrial Construction Ltd of Nisku, and Toromont Process Systems of Houston and Calgary are described to illustrate the widespread demand for customized drilling rigs, including the growing preference for electric drives. Top drive systems, as opposed to rotary drives also have become very popular; six out of ten rigs are sold with electric top drives today compared with fewer than 10 rigs a decade ago. At the same time, Tesco has recently signed a deal with Conoco Inc to construct three revolutionary drilling rigs using Tesco's proprietary Casing Drilling Technology, which uses standard oilfield casing instead of drill pipe, allowing operators to simultaneously drill, case and evaluate oil and gas wells. Aecon and PCL Industrial Construction have had much demand for customized spools and modules particularly from the oil sands industry, while Toromont Process Systems is also expanding its Calgary facilities to meet the demand for its dual gas compression equipment used by power stations for gas compression and co-generation, natural gas refrigeration and specialty gas processing.

  20. Gulf of Mexico rig activity up, international lags

    International Nuclear Information System (INIS)

    Rappold, K.

    1994-01-01

    Demand for jack up and semisubmersible rigs has improved in the Gulf of Mexico following a decline in activity earlier this year. International drilling activity, however, has shown slight declines in several regions. Relatively firm natural gas prices have helped buoy rig activity in North America. Rig day rates have not followed suit, mainly because of the influx of rigs from weaker international markets. Day rates in the US may not increase until international activity picks up and the world-wide drilling market tightens. Oil prices have hit almost $20/bbl, mainly because of the recent oil worker' strike in Nigeria and good demand. Natural gas prices in the US have hovered around $2.00/MMBTU, and many industry analysts expect gas prices to remain strong over the next few years. This paper gives data on drilling rig counts and crude oil and gas prices in the Gulf of Mexico and onshore

  1. What Really Rigs Up RIG-I?

    Science.gov (United States)

    Barik, Sailen

    2016-01-01

    RIG-I (retinoic acid-inducible gene 1) is an archetypal member of the cytoplasmic DEAD-box dsRNA helicase family (RIG-I-like receptors or RLRs), the members of which play essential roles in the innate immune response of the metazoan cell. RIG-I functions as a pattern recognition receptor that detects nonself RNA as a pathogen-associated molecular pattern (PAMP). However, the exact molecular nature of the viral RNAs that act as a RIG-I ligand has remained a mystery and a matter of debate. In this article, we offer a critical review of the actual viral RNAs that act as PAMPs to activate RIG-I, as seen from the perspective of a virologist, including a recent report that the viral Leader-read-through transcript is a novel and effective RIG-I ligand. © 2016 S. Karger AG, Basel.

  2. Catamaran type semisubmersible platform for offshore drilling

    Energy Technology Data Exchange (ETDEWEB)

    Pouget, G; Chevallier, J; Hampton, G

    1988-06-10

    A semi-submersible oil rig which allows the vertical storage of drilling tubes and drill pipes is presented. The structure which links the floaters to the bridge consists of hollow columns forming caissons and containing means for storing tubes.

  3. Professional development of new rig supervisors a must

    International Nuclear Information System (INIS)

    Nordt, D.P.; Stone, M.S.

    1992-01-01

    This paper reports that because the number of drilling personnel has dropped dramatically over the last decade, many operators now face a shortage of competent rig supervisors. To be effective, the rig supervisor must develop a knowledge of drilling operations, apply optimization techniques to improve drilling performance, demand safe work practices, and protect the environment. Petroleum engineering degree programs and industry training programs can teach the rig supervisor specific technical and management skills; however, traditionally, the supervisor trainee shadows an experienced company man to learn how to direct a drilling operation. The success of this method depends not only on the skills and learning capabilities of the trainee but also on the trainer's time, motivation, knowledge, and ability to teach the skills necessary to direct drilling activities

  4. Increasing Geothermal Energy Demand: The Need for Urbanization of the Drilling Industry

    Science.gov (United States)

    Teodoriu, Catalin; Falcone, Gioia

    2008-01-01

    Drilling wells in urban spaces requires special types of rigs that do not conflict with the surrounding environment. For this, a mutation of the current drilling equipment is necessary into what can be defined as an "urbanized drilling rig." Noise reduction, small footprint, and "good looking" rigs all help persuade the general public to accept…

  5. Argentina's YPF outlines plan for sale of rigs

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that state owned Yacimientos Petroliferos Fiscales (YPF) has unveiled the schedule it plans to follow to privatize oil and gas contract drilling in Argentine. YPF proposes to exit the drilling business by selling state owned drilling rigs, drill pipe, and accessories in a series of auctions beginning next month and lasting through first quarter 1993. YPF intends to open bids Dec. 16 for a completion unit and 30 drilling rigs, several working under contract. Bids will be opened during first quarter 1993 for new and used YPF drill pipe and collars, spare equipment and accessories, and an inventory of fishing tools said to be one of the largest in South America. Winners are to be notified immediately after each auction. YPF plans to hand over by Feb. 1, 1993, the rigs sold in December. Companies buying YPF drilling assets in first quarter 1993, the rigs sold in December. Companies buying YPF drilling assets in first quarter 1993 are to assume ownership by Mar. 24, 1993

  6. Minimal disturbance : Ensign's ADR-1000-CT rig aimed at CBM market

    International Nuclear Information System (INIS)

    Roche, P.

    2005-01-01

    Ensign Resource Services Group Inc. has recently designed a light, mobile rig aimed at Western Canada's coalbed methane (CBM) market. With a 1000 metre depth rating, the automated ADR-1000-CT rig can drill with either jointed pipe or 3 and a half-inch coil. Tractor units are used to move the rig to avoid the extra traffic generated by third-party trucks. The rig's self-levelling capability creates less environmental disturbance. Each component works on sites with as much as 2 metres difference in elevation, which reduces the need for earth-moving equipment. As drilling moves closer to farms and acreages, minimal environmental disturbance is crucial to the CBM industry. The rig won a 2005 Alberta government award for innovations in workplace health and safety as the design eliminates many of the tasks where injuries occur on conventional rigs. On conventional rigs, drill-strings are suspended from a travelling block which is suspended from the crown of a large, heavy derrick. With the ADR, hydraulic cylinders bear the weight of the drill string, and the derrick serves mainly to guide the top drive. When drilling only with jointed pipe, the coiled-tubing reel is a separate load so that drilling crews don't have to transport it around on programs requiring only jointed pipe. If coil is needed, the reel can be trucked to the site and plugged in to the rest of the rig. Tubing is expected to last 3 times as long as on a regular coiled-tubing rig, as the reel is positioned directly over the rotary table. The rigs have been used for various drilling projects and have performed satisfactorily with high penetration rates due to their large mud pumps. It was concluded that the ADR-1000-CT rig's hydraulic self-levelling capability and agility are helpful features when drilling in a minimal disturbance environment. 3 figs

  7. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  8. A rigged market

    International Nuclear Information System (INIS)

    Thomas, M.

    2000-01-01

    The mobile rig market remains a unique sector of the global upstream oil and gas industry. Big oil is continuing to emerge blinking from the darkness of its recent cash-starved existence to bask in the glory of a resurgent oil price. But the rig sector is once again lagging behind the pace being set by operators as they open up their wallets for new or delayed exploration and production projects. This paper gives statistics on worldwide count and contracts

  9. Emplacement hole drill evaluation and specification study. Volume I

    International Nuclear Information System (INIS)

    1977-01-01

    Results of a conceptual design program are presented for mine floor drilling in preparation for radioactive waste disposal. Two classes of drills can be used to drill emplacement holes in salt. Both are sufficiently rugged and reliable. Raise borers have a higher capital cost and require more modifications, but are more flexible in other applications and require less labor. The life cycle cost for the raise borers and for the auger rigs are about the same, while the life cycle costs of bucket drills are much higher. As long as the hole is 36 inches in diameter or less and 40 feet deep or less in salt, then the auger rig is recommended because of the lower capital cost and lower operating cost. This recommended system represents what is thought to be the best combination of available drill components assembled into a drill rig which will provide at least adequate performance. Furthermore, this drill system can be procured from at least three manufacturers. If the facility criteria change significantly, however, then the drill rig recommendations will have to be reassessed on the merits of the changes. The drill rig manufacturers can be quite flexible in combining components provided the buyer is willing to accept components with which the manufacturer has had experience. If this condition can be met, then most drill rig manufacturers will include the associated design cost as part of the drill cost. If special components are required, however, then the number of manufacturers willing to participate in a procurement may be severely reduced

  10. Rig automation: where it's been and where it's going

    Energy Technology Data Exchange (ETDEWEB)

    Rinaldi, R.

    1982-06-01

    For over 30 years dreamers, tinkerers and engineers have attempted to automate various drilling functions. Now this effort is paying off, and a partially automated rig is no longer a curiosity. Fully automated and computerized rigs are on the way. For the contractor this means higher productivity, but more maintenance and training responsibilities.

  11. Essays on bid rigging

    NARCIS (Netherlands)

    Seres, Gyula

    2016-01-01

    Manipulating prices in auctions raises antitrust concerns. Collusion lowers the revenue of the auctioneer and creates information rents. Bid rigging is a prevalent phenomenon and the affected market is enormous. Public procurement amounts to between 10 and 25 percent of national GDP in

  12. New drilling optimization technologies make drilling more efficient

    Energy Technology Data Exchange (ETDEWEB)

    Chen, D.C.-K. [Halliburton Energy Services, Calgary, AB (Canada). Sperry Division

    2004-07-01

    Several new technologies have been adopted by the upstream petroleum industry in the past two decades in order to optimize drilling operations and improve drilling efficiency. Since financial returns from an oil and gas investment strongly depend on drilling costs, it is important to reduce non-productive time due to stuck pipes, lost circulation, hole cleaning and well bore stability problems. The most notable new technologies are the use of computer-based instrumentation and data acquisition systems, integrated rig site systems and networks, and Measurement-While-Drilling and Logging-While-Drilling (MWD/LWD) systems. Drilling optimization should include solutions for drillstring integrity, hydraulics management and wellbore integrity. New drilling optimization methods emphasize information management and real-time decision making. A recent study for drilling in shallow water in the Gulf of Mexico demonstrates that trouble time accounts for 25 per cent of rig time. This translates to about $1.5 MM U.S. per well. A reduction in trouble time could result in significant cost savings for the industry. This paper presents a case study on vibration prevention to demonstrate how the drilling industry has benefited from new technologies. 13 refs., 10 figs.

  13. Challenges associated with pre-border management of biofouling on oil rigs.

    Science.gov (United States)

    Hopkins, Grant A; Forrest, Barrie M

    2010-11-01

    The potential for oil rigs to transport diverse, reef-like communities around the globe makes them high risk vectors for the inadvertent spread of non-indigenous species (NIS). This paper describes two case studies where a suite of pre-border management approaches was applied to semi-submersible drilling rigs. In the first case study, a drilling rig was defouled in-water prior to departure from New Zealand to Australia. Risk mitigation measures were successful in reducing biosecurity risks to the recipient region, but they resulted in the unintentional introduction of the non-indigenous brown mussel (Perna perna) to New Zealand when the rig was defouled in-water by divers. In the second case study, lessons learned from this high-profile incursion resulted in a more structured approach to pre-border management, and this serves as a useful template for future rig transfers. Copyright © 2010 Elsevier Ltd. All rights reserved.

  14. Computers make rig life extension an option

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The worldwide semisubmersible drilling rig fleet is approaching retirement. But replacement is not an attractive option even though dayrates are reaching record highs. In 1991, Schlumberger Sedco Forex managers decided that an alternative might exist if regulators and insurers could be convinced to extend rig life expectancy through restoration. Sedco Forex chose their No. 704 semisubmersible, an 18-year North Sea veteran, to test their process. The first step was to determine what required restoration, meaning fatigue life analysis of each weld on the huge vessel. If inspected, the task would be unacceptably time-consuming and of questionable accuracy. Instead a suite of computer programs modeled the stress seen by each weld, statistically estimated the sea states seen by the rig throughout its North Sea service and calibrated a beam-element model on which to run their computer simulations. The elastic stiffness of the structure and detailed stress analysis of each weld was performed with ANSYS, a commercially available finite-element analysis program. The use of computer codes to evaluate service life extension is described.

  15. This immortal coil? New CT rigs duel against singles

    Energy Technology Data Exchange (ETDEWEB)

    Creighton, J.

    1998-12-01

    New competition to conventional single rigs that have changed little in the last four decades face new competition from next-generation coiled tubing (CT) units which have multi-function capabilities, ranging from driving onto leases, drilling and setting surface case to cementing. Several of these new units are ready to challenge the conventional single rigs. Their ability to perform at high penetration rates (up to twice what single rigs can do) is expected to significantly cut drill time, with corresponding cost savings for both contractors and operators. Serval Corporation and Fleet Coiled Services are just two of the drilling service companies that have launched new shallow grass roots coiled tubing drilling units recently, gambling that the new technology will win over conventional methods hands down. Some major companies, like Fracmaster Ltd. and NOWSCO Well Service Ltd., have targeted the re-entry and horizontal markets, a much more difficult technical challenge, sinking billions of dollars of research and development money into advancing the most technically difficult applications of coil technology.

  16. A vision for drilling

    Energy Technology Data Exchange (ETDEWEB)

    Millheim, K. [Montanuniversitaet Leoben (Austria)

    1995-12-31

    The future of drilling lies in its relationship with the oil and gas industry. This paper examines how the future of drilling is seen from the view point of the exploration manager, the drilling contractor, the drilling engineer and the company president or managing director. The various pressures on the oil and gas industry are examined, such as environmental issues, alternative energy sources, and the price of oil which determines how companies are run. Exploration activity is driven by the price of oil and gas. The development of wells with multiple horizontal wells or multiple horizontal wells with tributaries will reduce the cost of exploration. Companies will rely less and less on reservoir simulation and more on cheap well-bores, multi-lateral well-bores and will exploit oil that could not be exploited before. The cost of exploratory drilling will need to be kept down so that in the future the industry will get better at economically finding fields at the 10 million to 20 million barrel range that would not have been possible before. The future is expected to see drilling contractors tunnelling, making sewerage lines and drilling 10,000 foot wells with purpose built rigs. Franchising will become a feature of the industry as will the use of databases to answer key technical questions. Offshore platforms will be built to be moveable and disposable. The industry is capable of solving problems, meeting challenges and making ideas work, providing much hope for the future. 10 figs., 1 photo.

  17. Robotics Test Rig

    International Nuclear Information System (INIS)

    Schuurmans, P.

    2007-01-01

    The experimental Accelerator Driven System XT-ADS is being developed within the European 6th framework programme EUROTRANS using the MYRRHA DRAFT-2 as starting point. The aim for the XT-ADS is to demonstrate the feasibility of the ADS concept at reasonable power levels and to serve as a high performance, multi-purpose experimental irradiation device. One of the fundamental design options that has been taken is to do all maintenance and in-service inspection and repair duties by remote handling. Outside the XT-ADS vessel in a controlled though radio-active environment, remote handling concepts as those already in use at e.g. the Joint European Torus (JET) can be used. Extrapolation to remote handling inside the lead-bismuth eutectic filled main vessel of the XT-ADS is in principle feasible as was shown in a 2003 study performed by Oxford Technologies ltd for the case of MYRRHA. Nevertheless, it is clear that all critical remote handling components need to be qualified for use in liquid LBE. Thus, as a first step, a proof of principle (POP) experimental test rig is require. The principal goal of this work is to identify the critical technological issues that must be resolved to allow operation of remote handling manipulators inside the LBE filled main vessel of the XT-ADS and to propose a concept design and specification catalogue for a proof of principle test rig that is able to experimentally verify the main aspects of manipulator design

  18. Design and Exploitation Problems of Drill String in Directional Drilling

    Directory of Open Access Journals (Sweden)

    Bednarz Stanislaw

    2004-09-01

    Full Text Available Drill string design for directional drilling requires accounting for a number of factors. First, types and expected values of loads should be determined. Then, elements of the drill string should be so selected as to enable realization of the plan at specified loads. Some of additional factors, e. g. purchase, exploitation cost, geological conditions in the bore-hole, washing of the bore-hole, stability, trajectory, rig parameters, accuracy of gauges, pumps parameters remain in conflict. Drill pipes are made of rolled pipes, upset and welded with tool joints to 9,5 m long; the shorter ones can be made of hot forged rods. Exploitation requirements, being a result of practical experience supported by theoretical and laboratory analyses should be a part of syllabuses of technical staff educational programs. Apart from designing the string, it is also vital to lower the risk of a drilling failure. The significance of these aspects seems to be unquestionable.

  19. Case drilling - an innovative approach to reducing drilling costs

    Energy Technology Data Exchange (ETDEWEB)

    Madell, G.; Tessari, R. M. [Tesco Corp., Calgary, AB (Canada); Warren, T. [Tesco Drilling Technology, Calgary, AB (Canada)

    1999-11-01

    Casing drilling is introduced as a new drilling technique that uses standard oil field casing to simultaneously drill and case the well. The technology includes both rig and downhole equipment, customized to function effectively as an integrated drilling system. This paper describes the testing program designed to identify and overcome technical challenges. Although not fully optimized, it appears that the system is functional. Test results indicate the need for improvements in the pump down cement float equipment and the tools and procedures for drilling up the cement plugs. The pump down latch and retrieval system also needs to be further developed and tested for high angle directional applications. Cost savings in the range of 10 to 15 per cent are expected for trouble-free wells. By eliminating the cost of unscheduled events encountered in troublesome wells, cost savings may reach as high as 30 per cent. 3 refs., 7 figs.

  20. Stakeholder acceptance analysis ResonantSonic drilling

    International Nuclear Information System (INIS)

    Peterson, T.

    1995-12-01

    This report presents evaluations, recommendations, and requirements concerning ResonantSonic Drilling (Sonic Drilling), derived from a three-year program of stakeholder involvement. Sonic Drilling is an innovative method to reach contamination in soil and groundwater. The resonant sonic drill rig uses counter-rotating weights to generate energy, which causes the drill pipe to vibrate elastically along its entire length. In the resonant condition, forces of up to 200,000 pounds are transmitted to the drill bit face to create a cutting action. The resonant energy causes subsurface materials to move back into the adjacent formation, permitting the drill pipe to advance. This report is for technology developers and those responsible for making decisions about the use of technology to remediate contamination by volatile organic compounds. Stakeholders' perspectives help those responsible for technology deployment to make good decisions concerning the acceptability and applicability of sonic drilling to the remediation problems they face

  1. Investigating Knowledge Transfer Mechanisms for Oil Rigs

    DEFF Research Database (Denmark)

    Vianello, Giovanna; Ahmed, Saeema

    2009-01-01

    It is widely recognized, both in industry and academia, that clear strategies in knowledge transfer positively influence the success of a firm. A firm should support the transfer of knowledge by standardizing communication channels within and across departments, based upon personalization......, codification or a combination of these two strategies. The characteristics of the business influence the choice of communication channels used for knowledge transfer. This paper presents a case study exploring the transfer of knowledge within and across projects, specifically the transfer of service knowledge...... in the case of complex machinery. The strategies used for knowledge transfer were analysed and compared with the expected transfer mechanisms, similarities and differences were investigated and are described. A family of four identical rigs for offshore drilling was the selected case. The transfer...

  2. Oil drilling gets more dangerous; Oljeboring blir farligere

    Energy Technology Data Exchange (ETDEWEB)

    Helgesen, Ole K.

    2010-07-01

    The government calls for accelerating the development of new drilling technologies. Incredible value may be lost if drilling is not made safer. But when public funding will be awarded, one of the world's major drilling facilities is far behind in the queue. Statoil has placed a big part of their research to the drilling rig Ullrig and the results from this has resulted in significant value creation for Norway and the oil and gas industry. (AG)

  3. Hoisting and Rigging (Formerly Hoisting and Rigging Manual)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This standard is intended as a reference document to be used by supervisors, line managers, safety personnel, equipment operators, and any other personnel responsible for safety of hoisting and rigging operations at DOE sites. It quotes or paraphrases the US OSHA and ANSI requirements. It also encompasses, under one cover,hoisting and rigging requirements, codes, standards, and regulations, eliminating the need to maintain extensive (and often incomplete) libraries of hoisting and rigging standards throughout DOE. The standard occasionally goes beyond the minimum general industry standards established by OSHA and ANSI, and also delineates the more stringent requirements necessary to accomplish the complex, diversified, critical, and often hazardous hoisting and rigging work found with the DOE complex.

  4. The Swedish Deep Drilling Program - an emerging scientific drilling program and new infrastructure.

    Science.gov (United States)

    Lorenz, Henning; Juhlin, Christopher

    2010-05-01

    Scientific drilling projects imply numerous aspects that are difficult to handle for individual research groups. Therefore, about three years ago a joint effort was launched in the Swedish geoscientific community to establish a national program for scientific drilling, the Swedish Deep Drilling Program (SDDP). Soon afterwards, several working groups established drilling proposals with Nordic and, also, international participation. With this serious interest in scientific drilling SDDP was able to successfully promote the Swedish membership in ICDP which commenced in 2008. Two SDDP projects achieved workshop grants from the International Continental Scientific Drilling Program (ICDP) in 2009. In the same year the Swedish Research Council decided to support an application for a truck-mounted drill rig - a big success for the SDDP working group. Scientific Drilling infrastructure: SDDP envisages a mobile platform that is capable of core drilling to at least 2500 m depth. The procurement will be made during 2010 and first operations are planned for 2011. This drill rig is primarily intended for use in the SDDP drilling projects, but will be rented out to other scientific drilling projects or even commercial enterprises in the remaining time to cover maintenance and future upgrade costs. SDDP's drill rig will be unique in Europe and complementary to the deep drilling InnovaRig of the GFZ German Research Centre for Geosciences. Until now, drilling to 2000 - 3000 m implied the use of a full-sized drill rig like the InnovaRig or the mobilization of a core drill rig from another continent. This gap will now be filled by Sweden's upcoming scientific drilling infrastructure. Drilling projects and proposals: Presently, SDDP serves six projects: "Collisional Orogeny in the Scandinavian Caledonides" (COSC; ICDP workshop spring 2010), the "Postglacial Fault Drilling Project" (PFDP; ICDP workshop autumn 2010), a "Deep Rock Laboratory" (DRL), "Palaeoproterozoic Mineralized Volcanic

  5. Experimental rigs for MHD studies

    International Nuclear Information System (INIS)

    Venkataramani, N.; Jayakumar, R.; Iyer, D.R.; Dixit, N.S.

    1976-01-01

    An MHD experimental rig is a miniature MHD installation consisting of basic equipments necessary for specific investigations. Some of the experimental rigs used in the investigations being carried out at the Bhabha Atomic Research Centre, Bombay (India) are dealt with. The experiments included diagnostics and evaluation of materials in seeded combustion plasmas and argon plasmas. The design specifications, schematics and some of the results of the investigations are also mentioned. (author)

  6. Dewatering cuts drilling mud and disposal costs

    International Nuclear Information System (INIS)

    West, G.; Pharis, B.

    1991-01-01

    This paper reports on rig site dewatering of drilling fluids with recycling of processed water that can help an operator to comply with environmental rules by reducing volumes of waste and reducing long term liabilities. It can also reduce disposal costs and provide a cleaner drill site overall. Rig site dewatering is the process of injecting coagulants or flocculating chemicals into the mud entering a large clarifying centrifuge. This coagulates the fine, drilled particles allowing them to be separated from the fluid which can then be handled separately. Most of the environmental concerns during the 1980s involved hazardous materials and toxic wastes. Drilling fluids, many of which are chemically benign, have escaped many of the difficult-to-comply-with rules and regulations. During the 1990s, however, operators may be required to submit a written plan for liquid waste reduction for even nonhazardous materials. Many states and local agencies may institute total bans on oil field wastes. Drilling rigs typically produce about 1 bbl of liquid waste for every 1 ft of hole drilled. Thus, a typical drilling operation can produce a large quantity of waste

  7. Innovative techniques cut costs in wetlands drilling

    International Nuclear Information System (INIS)

    Navarro, A.R.

    1991-01-01

    This paper reports on an approach to drilling oil and gas wells in sensitive wetlands areas contributed to a savings of over $1.2 million on a three-well, $3 million drilling project in south Louisiana. ARCO Oil and Gas Co. drilled a three-well project in the Bayou Sale field with a truck-mounted workover rig and a modified solids-control system. This smaller equipment eliminated the need to build a large location in the marsh. Traditional drilling techniques require a large drillsite to accommodate all the equipment of a modern drilling complex. However, recently imposed environmental regulations substantially limit, and in some cases prohibit, the use of these conventional techniques for drilling wells in wetlands areas. Based on the potentially huge economic and operational impact on the drilling industry because of these stricter regulations, alternatives to these traditional practices are essential

  8. Drilling technology advances on four fronts

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2002-01-01

    Trends and advances in drilling technology are discussed. Four different major trends have been identified. One of these is proprietary case drilling which is said to allow operators to simultaneously drill, case, and evaluate oil and gas wells. In proprietary case drilling, the well is drilled with standard oil field casing which remains in the hole all the time, eliminating the need for tripping. Drill bits and other downhole tools are lowered via wireline inside the casing and latched to the last joint of casing. Wells are drilled either by rotating the casing or by using a downhole mud motor for steering, using conventional directional tools. This technology was introduced by Tesco and is marketed in 25 countries along with a full range of drilling products and services. Super single rigs are an other trend which, owing to their versatility, combined with relatively small environmental footprint have become the rig of choice in a growing number of drilling programs. Super single rigs use 45-ft. joints of drill pipe, more versatile top drives and they have an automated pipe handling system. Super singles can be used on both vertical and slant wells and offer advantages of lower costs, higher efficiencies and greater drilling depths. Given their low environmental impact hydraulic capability, super singles also find application where zero disturbance rules are in effect, as for example, in some parts of southern Alberta. Directional drilling and MWD are most associated with SAGD projects but they also have been used and made significant difference in other spheres of oil recovery as well. The fact is that about 35 percent of wells drilled today are drilled with some form of directional drilling; this will stimulate the growth of ever more advanced MWD technology. Northern rigs are in a class of their own in that here the emphasis is on keeping the crew warm, as opposed to lots of gadgets. The most immediately-visible heat-conserving modification is the 60-ft wind

  9. Method and apparatus for determining fluid circulation conditions in well drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Gehrig, G.F.; Speers, J.M.

    1986-09-09

    A system is described for monitoring the delta flow-rate of drilling fluid in the course of circulating drilling fluid through a well from a drilling rig, comprising: an inflow flowmeter adapted for establishing a first signal representing the rate at which drilling fluid is injected into the well from the drilling rig; an outflow flowmeter adapted for establishing a second signal representing the rate at which drilling fluid is returned to the drilling rig from the well; and a signal processing system adapted for receiving the first and second signals and calculating a third signal representing the filtered difference between the first and second signals, the signal processing system being adapted to repeatedly update the degree of filtering applied in calculating the third signal in accordance with a relation serving to increase the degree of filtering in response to an increase in the magnitude of the cyclical variations in the rate at which drilling fluid is returned to the drilling rig and to decrease the degree of filtering in response to a decrease in the magnitude of the cyclical variations in the rate at which drilling fluid is returned to the drilling rig.

  10. Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

    Energy Technology Data Exchange (ETDEWEB)

    Denninger, Kate; Eustes, Alfred; Visser, Charles; Baker, Walt; Bolton, Dan; Bell, Jason; Bell, Sean; Jacobs, Amelia; Nagandran, Uneshddarann; Tilley, Mitch; Quick, Ralph

    2015-09-02

    There is a significant amount of financial risk associated with geothermal drilling. This study of drilling operations seeks opportunities to improve upon current practices and technologies. The scope of this study included analyzing 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'Perfect Well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.) and poor data collection practices An online software database was used to format drilling data to IADC coded daily drilling reports and generate figures for analysis. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/ equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averaged 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million was spent on non-productive time in the 21 geothermal wells, compared with only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry using Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.

  11. Drilling history of core hole DB-15

    International Nuclear Information System (INIS)

    Diediker, L.D.; Ledgerwood, R.K.

    1980-09-01

    This core hole was drilled to obtain hydrologic and chemical data on the permeable zones of the Saddle Mountains and Wanapum Formations. These data were obtained by testing the zones that were penetrated during drilling. This testing-as-drilled method reduced the potential problems of interflow and water contamination. This report summarizes the drilling and coring operations; geologic logging, hydrologic testing, and geophysical logging activities; and cementing operations of DB-15 during drilling. The successful completion of DB-15 demonstrated that hydrologic testing can be conducted during core drilling operations. More reliable head measurements and uncontaminated representative water samples from isolated permeable zones, which have not been exposed to potential open borehole cross-flow and head equilibration problems, were benefits derived from the testing-as-drilled method. Disadvantages of the technique were a longer time to complete the borehole caused by time required for testing and increased drilling costs due to rig standby time during testing. Extension of the testing-as-drilled method to the drilling of future core holes is recommended. An evaluation should be made of the required hydrologic data and expected borehole stratigraphy before and during drilling to allow uninterrupted drilling in zones of low permeability that can be tested after drilling is complete

  12. Proceedings of the conference on shaft drilling technology

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This book contains the following topics, Market analysis, World-wide operations, Innovative drilling and boring, Raise boring, Shaft lining and fittings, Entry considerations for the Yucca Mountain exploratory shaft facility for potential Radioactive Waste Disposal, Drilling rigs in the coal industry

  13. Saving money on rig refurbishments through foreign trade zones or duty-drawback

    International Nuclear Information System (INIS)

    Ward, R.J. Jr.

    1997-01-01

    The recent boom in day rates for rigs capable of drilling in deep water and harsh environments has created a frenzy of rig refurbishment activity in shipyards located in US Gulf states. In most instances, the destination for the rigs upon completion is the US Outer Continental Shelf (USOCS) in the Gulf of Mexico. The problem faced by contractors/operators planning to use US shipyards is that this circumstance has caused difficulty in shielding rigs and their foreign-sourced components from US Customs duties. Under US Customs law, a bona fide exportation requires severance from US commerce and joining to the commerce of some foreign country or, in the case of a vessel supply, a qualifying international voyage. The USOCS does not qualify as an exportation, nor do movements to drilling sites located on it qualify as an international voyage. Described here are two possible solutions to this economic dilemma and an example of how the foreign trade zone solution was applied by Global marine in its plans for upgrading some of its semisubmersible drilling rigs for deepwater USOCS work

  14. A Built for Purpose Micro-Hole Coiled Tubing Rig (MCTR)

    Energy Technology Data Exchange (ETDEWEB)

    Bart Patton

    2007-09-30

    This report will serve as the final report on the work performed from the contract period October 2005 thru April 2007. The project 'A Built for Purpose Microhole Coiled Tubing Rig (MCTR)' purpose was to upgrade an existing state-of-the-art Coiled Tubing Drilling Rig to a Microhole Coiled Tubing Rig (MCTR) capable of meeting the specifications and tasks of the Department of Energy. The individual tasks outlined to meet the Department of Energy's specifications are: (1) Concept and development of lubricator and tool deployment system; (2) Concept and development of process control and data acquisition; (3) Concept and development of safety and efficiency improvements; and (4) Final unit integration and testing. The end result of the MCTR upgrade has produced a unit capable of meeting the following requirements: (1) Capable of handling 1-inch through 2-3/8-inch coiled tubing (Currently dressed for 2-3/8-inch coiled tubing and capable of running up to 3-1/2-inch coiled tubing); (2) Capable of drilling and casing surface, intermediate, production and liner hole intervals; (3) Capable of drilling with coiled tubing and has all controls and installation piping for a top drive; (4) Rig is capable of running 7-5/8-inch range 2 casing; and (5) Capable of drilling 5,000 ft true vertical depth (TVD) and 6,000 ft true measured depth (TMD).

  15. PNNL Hoisting and Rigging Manual

    Energy Technology Data Exchange (ETDEWEB)

    Haynie, Todd O.; Fullmer, Michael W.

    2008-12-29

    This manual describes the safe and cost effective operation, inspection, maintenance, and repair requirements for cranes, hoists, fork trucks, slings, rigging hardware, and hoisting equipment. It is intended to be a user's guide to requirements, codes, laws, regulations, standards, and practices that apply to Pacific Northwest National Laboratory (PNNL) and its subcontractors.

  16. Rigged Hilbert spaces for chaotic dynamical systems

    International Nuclear Information System (INIS)

    Suchanecki, Z.; Antoniou, I.; Bandtlow, O.F.

    1996-01-01

    We consider the problem of rigging for the Koopman operators of the Renyi and the baker maps. We show that the rigged Hilbert space for the Renyi maps has some of the properties of a strict inductive limit and give a detailed description of the rigged Hilbert space for the baker maps. copyright 1996 American Institute of Physics

  17. Hoisting and rigging manual: Uncontrolled document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-05-01

    This document is a draft copy of a Hoisting and Rigging Manual for the Department of Energy. The manual is divided into ten chapters. The chapter titles follow: terminology and definitions; operator training and qualification; overhead and gantry cranes; mobile cranes; forklift trucks; hoists; hooks; wire rope, slings, and rigging accessories; construction hoisting and rigging equipment requirements; references.

  18. MDS system increases drilling safety and efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Chevallier, J.; Turner, L. (Sedco Forex, Paris (FR))

    1989-09-01

    There's a great deal of data recorded during drilling operations on rigs these days, but it is seldom well utilized. The operator's company person relies upon mud loggers for collecting and recording most information. The methods used to process and display this information are often inadequate for those who need it the most the driller and toolpusher. Drilling contractor personnel usually have only rudimentary displays of drilling parameters, and practically no serious method of analysis except for daily paper reports. These are cumbersome to use and provide only incomplete data, after the fact. The MDS system, presented in this article, is a new information and alarm network, which rectifies this situation by bringing to the rig, for the first time, the latest in sensor and computer technologies. This system acquires key drilling data on the rig floor, pump room, and return line, and displays it in a clear graphical format to both the driller and the toolpusher in real time. It also provides the toolpusher with a workstation for easy access to the same information for evaluation and planning of the drilling program.

  19. Helicopter-supported drilling operation in Papua New Guinea

    International Nuclear Information System (INIS)

    Wagner, E.R.; Juneau, M.S.

    1991-01-01

    This paper reports on drilling cost per foot of Chevron's helilift drilling operation in the remote Southern Highlands of Papua New Guinea, reduced from 1360 to 267 S/ft (4462 to 876$/m) during the period from 1985 to 1989. The operation provides many challenges, as it is thousands of miles from major oil-field supply centers. This requires advanced will-planning and logistical management of drilling materials so that they arrive at the drilling rig in a timely manner. The wells are also drilled into structurally complex geology without the aid of seismic data which can lead to unexpected results

  20. Drilling unit

    Energy Technology Data Exchange (ETDEWEB)

    Umanchik, N P; Demin, A V; Khrustalev, N N; Linnik, G N; Lovchev, S V; Rozin, M M; Sidorov, R V; Sokolov, S I; Tsaregradskiy, Yu P

    1981-01-01

    A drilling unit is proposed which includes a hydraulic lifter, hydraulic multiple-cylinder pump with valve distribution and sectional drilling pump with separators of the working and flushing fluid. In order to reduce metal consumption and the overall dimensions of the drilling unit, the working cavity of each cylinder of the hydraulic multiple-cylinder pump is equipped with suction and injection valves and is hydraulically connected to the working cavity by one of the sections of the drilling pump.

  1. HIGH-POWER TURBODRILL AND DRILL BIT FOR DRILLING WITH COILED TUBING

    Energy Technology Data Exchange (ETDEWEB)

    Robert Radtke; David Glowka; Man Mohan Rai; David Conroy; Tim Beaton; Rocky Seale; Joseph Hanna; Smith Neyrfor; Homer Robertson

    2008-03-31

    Commercial introduction of Microhole Technology to the gas and oil drilling industry requires an effective downhole drive mechanism which operates efficiently at relatively high RPM and low bit weight for delivering efficient power to the special high RPM drill bit for ensuring both high penetration rate and long bit life. This project entails developing and testing a more efficient 2-7/8 in. diameter Turbodrill and a novel 4-1/8 in. diameter drill bit for drilling with coiled tubing. The high-power Turbodrill were developed to deliver efficient power, and the more durable drill bit employed high-temperature cutters that can more effectively drill hard and abrasive rock. This project teams Schlumberger Smith Neyrfor and Smith Bits, and NASA AMES Research Center with Technology International, Inc (TII), to deliver a downhole, hydraulically-driven power unit, matched with a custom drill bit designed to drill 4-1/8 in. boreholes with a purpose-built coiled tubing rig. The U.S. Department of Energy National Energy Technology Laboratory has funded Technology International Inc. Houston, Texas to develop a higher power Turbodrill and drill bit for use in drilling with a coiled tubing unit. This project entails developing and testing an effective downhole drive mechanism and a novel drill bit for drilling 'microholes' with coiled tubing. The new higher power Turbodrill is shorter, delivers power more efficiently, operates at relatively high revolutions per minute, and requires low weight on bit. The more durable thermally stable diamond drill bit employs high-temperature TSP (thermally stable) diamond cutters that can more effectively drill hard and abrasive rock. Expectations are that widespread adoption of microhole technology could spawn a wave of 'infill development' drilling of wells spaced between existing wells, which could tap potentially billions of barrels of bypassed oil at shallow depths in mature producing areas. At the same time, microhole

  2. Device for storing drilling pipes

    Energy Technology Data Exchange (ETDEWEB)

    Kolasinski, A; Wedrychowicz, J

    1981-02-16

    The patented device contains a profiled arch 14 (see figure) installed in the upper part of the drilling rig 15. On base 16 of the drilling unit, there is bin 1 which is installed on frame 2 to which it is hinge connected with the help of pin 3. On the other side, the bin rests on rollers 4 which are attached to lever 5 of lifting mechanism 6. Bin 1 is a series of parallel-arranged guides rigidly connected by transverse beams. Frame 2 contains the collapsible support 10. During operation of the device, the hydraulic lifter 6 with the help of frame 5 and rollers 4 lifts bin 1 with drilling pipes installed on it, giving it an angle of 4/sup 0/ in relation to the plane of frame 2. The collapsible support 10 is installed in a vertical position and holds bin 1. This position of bin 1 is the most suitable for movement of the vertically installed drilling pipes on the guides. The distinguishing feature of the patented device is the possibility of convenient arrangement of the drilling pipes on the guides of bin 1. Because of this, the time spent on lifting and lowering the drill apparatus is considerably reduced.

  3. The Winfrith horizontal impact rig

    International Nuclear Information System (INIS)

    Barr, P.

    1985-12-01

    The Horizontal Impact Rig has been designed to allow studies of the impact of radioactive material transport containers and their associated transport vehicles and impact limiters, using large scale models, and to allow physically large missiles to be projected for studying the impact behaviour of metal and concrete structures. It provides an adequately rigid support structure for impact experiments with targets of large dimensions. Details of its design, instrumentation, performance prediction and construction are given. (U.K.)

  4. What you should know about contract core drilling

    Energy Technology Data Exchange (ETDEWEB)

    Koontz, J.

    1985-07-01

    Most core drilling jobs are on the basis of so much per foot drilled. The driller pays for his crew's wages and overtime pay. He assumes the cost of all necessary supplies and has responsibility for unexpected problems. The customer is responsible for a water supply and must provide access roads to drill sites and prepare the sites. The following are important in selecting a driller; how long they have been in business, how many rigs they have and what condition the rigs are in and their financial condition. Detailed discussions with the driller before he starts the job and a daily drill report are important. A best possible core recovery should be expected. Communication with the driller is the most important factor when involved in a core drilling project.

  5. Depths of controlled drillings by means of underground drives; Teufen von gesteuerten Bohrungen mittels Untertageantrieben

    Energy Technology Data Exchange (ETDEWEB)

    Hengevoss, Charly [Weatherford Ukraine LLC, Kiev (Ukraine); Homrighausen, Reiner [BAUER Resources GmbH, Schrobenhausen (Germany)

    2013-03-01

    Today, the most modern directional drilling technology not only is used in case of very deep drillings (deeper or longer than 2,000 meter) by means of deep-level drilling rigs, but also with small, highly mobile universal drilling rigs. Thus, drilling costs are reduced, and unconventional hydrocarbons (methane gas - oil shale and shale gas) deposits are explores economically. Furthermore, known near-surface petroleum deposits in Northern Germany as well as in other parts of the Earth (such as in Romania, the U.S.A. or in Canada) which extraction of petroleum is very low already are interesting economically. Furthermore, today it is possible to investigate with controlled drillings more economically and with more safe sites for a possibly final storage of highly radioactive wastes. Controlled drillings may give an answer to geotechnical questions on highly inaccessible on optimum points for drilling wells in order to plan underground cavities or to investigate tunnel axes geotechnical or hydrological.

  6. Research on control system of truck-mounted rig for coalbed methane

    Directory of Open Access Journals (Sweden)

    Wang Hejian

    2018-01-01

    Full Text Available The coal-bed methane (CBM as a kind energy is clean and efficient, also it can become a security risk in mining process if it could not get out of the coal seam. In view of the current large-scale exploitation of coal-bed methane resources, the development of drilling rig for CBM drilling is needed. The parameters and structures were introduced in the paper. The rig uses a highly integrated approach that integrates the required functions on the chassis of the vehicle to meet the needs of rapid installation and transportation. Drilling control system uses hydraulic control and electro-hydraulic control dual control mode, can achieve short-range and remote control operations. The control system include security circuits and electric control system. Through the field trial, it is shown that the rig can meet the construction of the majority of coalbed methane drilling in the country and the performance is stable and the operation is simple.

  7. The Winfrith 9MW heat transfer rig

    International Nuclear Information System (INIS)

    Obertelli, J.D.

    1976-01-01

    The Winfrith 9MW Rig is used for studying heat transfer and flow resistance in a variety of test sections at system pressures up to 68 bar. The basic rig and its instrumentation are discussed together with the characteristics of the test section design. The rig has been used in studies involving the full scale simulation of Steam Generating Heavy Water (SGHW) fuel assemblies and the paper discusses the measurements made in this type of study. (author)

  8. Casing drilling TM : a viable technology for coal bed methane?

    Energy Technology Data Exchange (ETDEWEB)

    Madell, G.; Muqeem, M. [Tesco Corp., Calgary, AB (Canada)

    2001-07-01

    This paper highlighted the experience that Tesco has gained by drilling more than 30 wells using only casings as the drill stem, suggesting that such technology could be advantageous for Coal Bed Methane (CBM) exploration and development. Tesco has manufactured a mobile and compact hydraulic drilling rig that is ideal to meet the great demand for CBM development in Canada. The Casing Drilling TM system, when used in conjunction with the drilling rig, could be very effective and efficient for exploration and development of CBM reserves which typically require extensive coring. Continuous coring while drilling ahead and wire line retrieval can offer time savings and quick core recovery of large diameter core required for exploration core desorption tests. The proposed system may also have the potential to core or drill typically tight gas sands or coal beds under balanced with air or foam. This would reduce drilling fluid damage while finding gas at the same time. Compared to conventional drill pipes, Casing Drilling TM could also be effective with water production from shallow sands because of the smaller annual clearance which requires less air volumes to lift any produced water. 8 refs., 3 tabs., 9 figs.

  9. Preliminary Research on Possibilities of Drilling Process Robotization

    Science.gov (United States)

    Pawel, Stefaniak; Jacek, Wodecki; Jakubiak, Janusz; Zimroz, Radoslaw

    2017-12-01

    Nowadays, drilling & blasting is crucial technique for deposit excavation using in hard rock mining. Unfortunately, such approach requires qualified staff to perform, and consequently there is a serious risk related to rock mechanics when using explosives. Negative influence of explosives usage on safety issues of underground mine is a main cause of mining demands related to elimination of people from production area. Other aspects worth taking into consideration are drilling precision according to drilling pattern, blasting effectiveness, improvement of drilling tool reliability etc. In the literature different drilling support solutions are well-known in terms of positioning support systems, anti-jamming systems or cavity detection systems. For many years, teleoperation of drilling process is also developed. Unfortunately, available technologies have so far not fully met the industries expectation in hard rock. Mine of the future is expected to incorporate robotic system instead of current approaches. In this paper we present preliminary research related to robotization of drilling process and possibilities of its application in underground mine condition. A test rig has been proposed. To simulate drilling process several key assumptions have been accepted. As a result, algorithms for automation of drilling process have been proposed and tested on the test rig. Experiences gathered so far underline that there is a need for further developing robotic system for drilling process.

  10. Going deep : new generation of giant rigs extends drillers' reach

    International Nuclear Information System (INIS)

    Laverty Wilson, K.

    2001-01-01

    The Eirik Roude, an offshore super rig, arrived in Halifax Harbour from Florida in the summer 2001 for a retrofit before it is sent to work in the rugged environment offshore of Nova Scotia. The drilling platform is a joint venture between PanCanadian Petroleum and Ocean Rig. Is is the most technologically advanced and sophisticated deep water drilling platform in the world and can operate in 3,000 metre deep water for 365 days of the year. It is a fifth-generation semi-submersible rig. It floats on long legs that lower the centre of gravity below surface turbulence to provide a stable work platform even during Atlantic storms. The 110 metre long rig has three mud systems that store 593 cubic metres in mud pits, 1,260 cubic metres in pontoons, and can carry 26,140 barrels of fuel oil, 4,070 barrels of potable water and 13,210 barrels of drilling water. PanCanadian has provided $2 million to the Nova Scotia Community College to teach an appropriate curriculum for the required workforce. It is expected that 120 local workers will be recruited. PanCanadian plans to drill 3 or 4 offshore wells annually for the next 5 years. It is estimated that 700-800 workers will be on site at the peak of the retrofit. In addition, Marathon Oil has contracted the Smedvig-owned West Navion for Nova Scotia work. This vessel is designed to work in depths of up to 2,500 metres and can be upgraded to reach 3,000 metres. Its' dual handling capacity makes it suitable to do drilling and well completion simultaneously, thereby reducing the halts in operations and increasing the drilling efficiency. East Coast governments and trade associations are also committed to make the most of the offshore oil and gas revival, including the development of a petrochemical market. Their goal is to build a world class energy sector while protecting the environment and optimizing the financial, economic and social benefits to Nova Scotians. The Nova Scotia Benefits program requires that oil companies

  11. Managing Geothermal Exploratory Drilling Risks Drilling Geothermal Exploration and Delineation Wells with Small-Footprint Highly Portable Diamond Core Drills

    Science.gov (United States)

    Tuttle, J.; Listi, R.; Combs, J.; Welch, V.; Reilly, S.

    2012-12-01

    Small hydraulic core rigs are highly portable (truck or scow-mounted), and have recently been used for geothermal exploration in areas such as Nevada, California, the Caribbean Islands, Central and South America and elsewhere. Drilling with slim diameter core rod below 7,000' is common, with continuous core recovery providing native-state geological information to aid in identifying the resource characteristics and boundaries; this is a highly cost-effective process. Benefits associated with this innovative exploration and delineation technology includes the following: Low initial Capital Equipment Cost and consumables costs Small Footprint, reducing location and road construction, and cleanup costs Supporting drill rod (10'/3meter) and tools are relatively low weight and easily shipped Speed of Mobilization and rig up Reduced requirements for support equipment (cranes, backhoes, personnel, etc) Small mud systems and cementing requirements Continuous, simplified coring capability Depth ratings comparable to that of large rotary rigs (up to ~10,000'+) Remote/small-location accessible (flown into remote areas or shipped in overseas containers) Can be scow or truck-mounted This technical presentation's primary goal is to share the technology of utilizing small, highly portable hydraulic coring rigs to provide exploratory drilling (and in some cases, production drilling) for geothermal projects. Significant cost and operational benefits are possible for the Geothermal Operator, especially for those who are pursuing projects in remote locations or countries, or in areas that are either inaccessible or in which a small footprint is required. John D. Tuttle Sinclair Well Products jtuttle@sinclairwp.com

  12. Drilling reorganizes

    Science.gov (United States)

    Richman, Barbara T.

    As the first in a proposed series of steps that would move scientific ocean drilling from its own niche within the National Science Foundation's (NSF) Directorate for Astronomical, Atmospheric, Earth, and Ocean Sciences (AAEO) into the agency's Division of Ocean Sciences, Grant Gross, division director, has been appointed acting director of the Office of Scientific Ocean Drilling (OSOD). Gross will retain the directorship of the division, which also is part of AAEO. Allen M. Shinn, Jr., OSOD director for nearly 2 years, has been reassigned effective July 10 to a position in NSF's Office of Planning and Resource Management.The move aims to tie drilling operations more closely to the science with which it is associated, Gross said. This first step is an organizational response to the current leaning toward using a commercial drilling vessel as the drilling platform, he said. Before the market for such commercial drill ships opened (Eos, February 22, 1983, p . 73), other ship options for scientific ocean drilling included refurbishing the aging Glomar Challenger or renovating, at great expense, the Glomar Explorer. A possible next step in the reorganization is to make OSOD the third section within the Ocean Sciences Division. Currently, the division is divided into the Oceanographic Facilities and Support Section and the Ocean Sciences Research Section.

  13. Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

    Energy Technology Data Exchange (ETDEWEB)

    Tilley, Mitch; Eustes, Alfred; Visser, Charles; Baker, Walt; Bolton, Dan; Bell, Jason; Nagandran, Uneshddarann; Quick, Ralph

    2015-01-26

    There is a significant amount of financial risk associated with geothermal drilling; however, there are opportunities to improve upon current practices and technologies used. The scope of this drilling operational study included 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'perfect well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.), poor data collection, and difficult to ascertain handwriting. An online software database was used to format drilling data to IADC coded daily drilling reports and generate analysis figures. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averages 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million would be lost due to non-productive time in the 21 geothermal wells and only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry. It is the use of Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. However, a work-flow must also be established in order for there to be an efficient drilling program. Potential improvements for current geothermal operations are: the use of electronic records, real

  14. Pressured drilling riser design for drilling in ultra deep water with surface bop

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, J.; Morrison, D.; Efthymiou, M.; Lo, K.H. [Shell Global Solutions, 78 - Velizy Villacoublay (France); Magne, E.; Leach, C. [Shell Internationale Exploration and Production (Netherlands)

    2002-12-01

    In conventional drilling with a semi-submersible rig valuable rig time is used to run and retrieve the BOP and its accessories on the seabed, and this time increases with water depth. Furthermore, use of the conventional sub-sea BOP requires a large-diameter riser, which requires substantial rig storage and deck load capacity prior to installation. It also requires high riser-tensioning capacity or additional buoyancy. Thus as the water depth increases, it leads to a need for heavy duty 4. and 5. generation rigs with escalation in costs. The high cost of deep-water drill rigs is leading to the development of Surface BOP technology. In this development, the BOP is placed above sea level and the riser is simply a continuation of the casing (typical diameter 13-3/8''). This eliminates the need for a heavy 21'' riser and for running the BOP to the sea bed and retrieving it. Moreover, the reduced tension requirement for the smaller riser extends the water depth capability of 3. generation drilling semi-submersibles, enabling them to drill in deeper waters. A critical success factor for this development is the ability to design the riser/casing to withstand high internal pressures due to well kicks, in addition to environmental loads, and to restrict vessel offsets within certain limits so as not to overload the riser under the prevailing weather conditions. This paper addresses the design considerations of a pressured drilling riser that can be used with a surface BOP in deep-water. Key design issues that are sensitive to ultra-deep-water applications are discussed. The technical aspects of using (disposable) standard casing with threaded connector for the drilling riser are discussed, with a particular emphasis on the connector fatigue-testing program to quantify the stress concentration factor for fatigue design. Emerging composite material offers some alternatives to the steel riser when drilling in ultra-deep water Design issues related to the

  15. 29 CFR 1918.54 - Rigging gear.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Rigging gear. 1918.54 Section 1918.54 Labor Regulations...) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Vessel's Cargo Handling Gear § 1918.54 Rigging gear. (a... other alternate device shall be provided to allow trimming of the gear and to prevent employees from...

  16. New method speeds drilling, attracts takeover

    Energy Technology Data Exchange (ETDEWEB)

    Brimble, S.

    2000-06-12

    Plains Energy Services Ltd is currently building a prototype drilling rig known as the Cisco 2000. It is expected to extend the limit of coiled tubing applications into deeper formations and in so doing challenge conventional drilling methods to match its performance in terms of speed and pricing. An indication of the seriousness of this challenge is the uninvited takeover bid by Precision Drilling Corporation, the largest Canadian oilfield contractor. The Cisco 2000 is said to have a pulling capacity of 120,000 lbs in bench tests, twice as much as existing rigs, and is capable of drilling to 7,200 feet using a 3.5 inch coil. Plain Energy's existing units are capable of penetrating only about 4,900 feet. The new technology involves a modified injector design which will resemble a conveyor belt with the gripper blocks located on top. This allows the tubing to be gripped from all four sides which accounts for the increased pulling power. The advantage of coiled tube drilling lies in the speed with which the operation can be completed and the corresponding cost reductions which result from the reduced rental cost of support equipment. Plains Energy urged its shareholders to reject the takeover offer in its present form, but is said to be open to better offers.

  17. Technical performance of drilling operations of wells Erslev 1 and 2 on Mors Salt Dome

    International Nuclear Information System (INIS)

    Gomm, H.

    1982-01-01

    This paper deals strictly with the performance of the drilling itself. The wells were designed and drilled by an international team of experts, using a Cabot Franks Explorer 900 rig. The two exploration wells were located in the top area of the Mors Saltdome after geological and geophysical investigations at a distance of about 1 100 m. (EG)

  18. Hydraulics calculation in drilling simulator

    Science.gov (United States)

    Malyugin, Aleksey A.; Kazunin, Dmitry V.

    2018-05-01

    The modeling of drilling hydraulics in the simulator system is discussed. This model is based on the previously developed quasi-steady model of an incompressible fluid flow. The model simulates the operation of all parts of the hydraulic drilling system. Based on the principles of creating a common hydraulic model, a set of new elements for well hydraulics was developed. It includes elements that correspond to the in-drillstring and annular space. There are elements controlling the inflow from the reservoir into the well and simulating the lift of gas along the annulus. New elements of the hydrosystem take into account the changing geometry of the well, loss in the bit, characteristics of the fluids including viscoplasticity. There is an opportunity specify the complications, the main one of which is gas, oil and water inflow. Correct work of models in cases of complications makes it possible to work out various methods for their elimination. The coefficients of the model are adjusted on the basis of incomplete experimental data provided by operators of drilling platforms. At the end of the article the results of modeling the elimination of gas inflow by a continuous method are presented. The values displayed in the simulator (drill pipe pressure, annulus pressure, input and output flow rates) are in good agreement with the experimental data. This exercise took one hour, which is less than the time on a real rig with the same configuration of equipment and well.

  19. Deep Drilling Basic Research: Volume 4 - System Description. Final Report, November 1988--August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, E.E.; Maurer, W.C.; Hood, M.; Cooper, G.; Cook, N.

    1990-06-01

    The first section of this Volume will discuss the ''Conventional Drilling System''. Today's complex arrangement of numerous interacting systems has slowly evolved from the very simple cable tool rigs used in the late 1800s. Improvements to the conventional drilling rig have varied in size and impact over the years, but the majority of them have been evolutionary modifications. Each individual change or improvement of this type does not have significant impact on drilling efficiency and economics. However, the change is almost certain to succeed, and over time--as the number of evolutionary changes to the system begin to add up--improvements in efficiency and economics can be seen. Some modifications, defined and described in this Volume as Advanced Modifications, have more than just an evolutionary effect on the conventional drilling system. Although the distinction is subtle, there are several examples of incorporated advancements that have had significantly more impact on drilling procedures than would a truly evolutionary improvement. An example of an advanced modification occurred in the late 1970s with the introduction of Polycrystalline Diamond Compact (PDC) drill bits. PDC bits resulted in a fundamental advancement in drilling procedures that could not have been accomplished by an evolutionary improvement in materials metallurgy, for example. The last drilling techniques discussed in this Volume are the ''Novel Drilling Systems''. The extent to which some of these systems have been developed varies from actually being tested in the field, to being no more than a theoretical concept. However, they all have one thing in common--their methods of rock destruction are fundamentally different from conventional drilling techniques. When a novel drilling system is introduced, it is a revolutionary modification of accepted drilling procedures and will completely replace current techniques. The most prominent example of a

  20. Body Language Advanced 3D Character Rigging

    CERN Document Server

    Allen, Eric; Fong, Jared; Sidwell, Adam G

    2011-01-01

    Whether you're a professional Character TD or just like to create 3D characters, this detailed guide reveals the techniques you need to create sophisticated 3D character rigs that range from basic to breathtaking. Packed with step-by-step instructions and full-color illustrations, Body Language walks you through rigging techniques for all the body parts to help you create realistic and believable movements in every character you design. You'll learn advanced rigging concepts that involve MEL scripting and advanced deformation techniques and even how to set up a character pipeline.

  1. Big-hole drilling - the state of the art

    International Nuclear Information System (INIS)

    Lackey, M.D.

    1983-01-01

    The art of big-hole drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being drilled by the rotary-drilling process, but almost all the hardware and systems have undergone many changes during the intervening years. The current design of bits, cutters, and other big-hole-drilling hardware results from contributions of manufacturers and Test Site personnel. The dual-string, air-lift, reverse-circulation system was developed at the Test Site. Necessity was really the Mother of this invention, but this circulation system is worthy of consideration under almost any condition. Drill rigs for big-hole drilling are usually adaptations of large oil-well drill rigs with minor modifications required to handle the big bits and drilling assemblies. Steel remains the favorite shaft lining material, but a lot of thought is being given to concrete linings, especially precast concrete

  2. Drilling mud

    Energy Technology Data Exchange (ETDEWEB)

    Rusayev, A A; Bibikov, K V; Simonenkov, I D; Surkova, K I

    1982-01-01

    Drilling mud is proposed which contains clay, water, water output reducer, pH regulator, viscosity reducer and hydrogen sulfide absorber. In order to improve the absorbing capacity of the drilling mud with pH 8-11 and simultaneously preservation of the technological properties of the mud, it contains as the absorber of hydrogen sulfide pyrite cinders with the following ratio of components, % by mass: clay 5.0-35.0; water output reducer 0.2-2.0; pH regulator 0.05-0.25; viscosity reducer 0.1-1.0; pyrite cinders 0.5-4.0; water--the rest.

  3. Learning Inverse Rig Mappings by Nonlinear Regression.

    Science.gov (United States)

    Holden, Daniel; Saito, Jun; Komura, Taku

    2017-03-01

    We present a framework to design inverse rig-functions-functions that map low level representations of a character's pose such as joint positions or surface geometry to the representation used by animators called the animation rig. Animators design scenes using an animation rig, a framework widely adopted in animation production which allows animators to design character poses and geometry via intuitive parameters and interfaces. Yet most state-of-the-art computer animation techniques control characters through raw, low level representations such as joint angles, joint positions, or vertex coordinates. This difference often stops the adoption of state-of-the-art techniques in animation production. Our framework solves this issue by learning a mapping between the low level representations of the pose and the animation rig. We use nonlinear regression techniques, learning from example animation sequences designed by the animators. When new motions are provided in the skeleton space, the learned mapping is used to estimate the rig controls that reproduce such a motion. We introduce two nonlinear functions for producing such a mapping: Gaussian process regression and feedforward neural networks. The appropriate solution depends on the nature of the rig and the amount of data available for training. We show our framework applied to various examples including articulated biped characters, quadruped characters, facial animation rigs, and deformable characters. With our system, animators have the freedom to apply any motion synthesis algorithm to arbitrary rigging and animation pipelines for immediate editing. This greatly improves the productivity of 3D animation, while retaining the flexibility and creativity of artistic input.

  4. {open_quote}Nintendo Rig{close_quote} lets two men do work of three on traditional servicing rig

    Energy Technology Data Exchange (ETDEWEB)

    Rintoul, B.

    1996-01-01

    New well servicing rig saves costs and increases safety by using a robot derrickman. The rigs is called the Nintendo Rig, taking the name from the joystick that controls the robot on the racking board 25 feet above the ground. An automated tong/slip package permanently mounted on the front of the rig handles pipe and rods on the ground.

  5. Numerical Application of a Stick-Slip Control and Experimental Analysis using a Test Rig

    Directory of Open Access Journals (Sweden)

    Pereira Leonardo D.

    2018-01-01

    Full Text Available Part of the process of exploration and development of an oil field consists of the drilling operations for oil and gas wells. Particularly for deep water and ultra deep water wells, the operation requires the control of a very flexible structure which is subjected to complex boundary conditions such as the nonlinear interactions between drill bit and rock formation and between the drill string and borehole wall. Concerning this complexity, the stick-slip phenomenon is a major component related to the torsional vibration and it can excite both axial and lateral vibrations. With these intentions, this paper has the main goal of confronting the torsional vibration problem over a test rig numerical model using a real-time conventional controller. The system contains two discs in which dry friction torques are applied. Therefore, the dynamical behaviour were analysed with and without controlling strategies.

  6. Drilling series. 4. ; Planning geothermal drilling (rotary type). Kussaku series. 4. ; Chinetsusei no kussaku keikaku (shutoshite rotary gata)

    Energy Technology Data Exchange (ETDEWEB)

    Ito, T. (S.K. Engineering Co. Ltd., Tokyo (Japan))

    1994-01-31

    The present report explained how to plan the drilling of geothermal well, and select the easing, drilling mud water and drilling rig in order to obtain the steam and hot water. The geothermal wells can be generally classified into exploration wells, production wells and reduction wells. The exploration well is a well to survey the underground strata, geological structure, and existence of steam and hot water, while the production well is a well to produce the steam and hot water. The reduction well is a well to condense the hot water produced by the production well and steam having passed through the power-generating turbine, and return them as condensate underground. The geothermal well is characterized by its high temperature, mud leakage, corrosive matter and scale, all of which make its drilling difficult and its management troublesome for the production and reduction. To plan the drilling, the order of processing are distinct conditioning of drilling differently by type of well, collection of geological survey data, programing for the casing and selection of drilling rig. The present report also gave the stress to affect the casing and standard of steel pipes to be used for the casing. 3 figs., 4 tabs.

  7. Drilling mud

    Energy Technology Data Exchange (ETDEWEB)

    Babets, M A; Nechayev, N D; Vinogradova, G P

    1982-01-01

    A drilling mud is proposed which contains clay, alkali, water and stabilizer reagent. It is distinguished by the fact that in order to improve the viscosity and static shear stress, the stabilizer reagent contained is composted solid general wastes with the following ratio of components (% by weight): clay 10-15, alkali 0.1-0.2; composted solid general wastes 2-5; water--the rest.

  8. Bucket drill

    Energy Technology Data Exchange (ETDEWEB)

    Bezverkhiy, V.M.; Nabokov, I.M.; Podoksik, D.Z.; Sadovskiy, S.S.; Shanyukevich, V.A.

    1983-01-01

    The bucket drill including a cylindrical housing with bottom, ground intake windows and cutting knives is hinged to the housing, the mechanism of rotation of the cutting knives including rods connected by the cutter knives, and drive shaft is distinguished by the fact that in order to improve the effectiveness of drilling by automatic change in the angle of cutting depending on the strength of the drillable rock, the drill is equipped with elastic elements and cap with annular slits in which there are elastic elements. The mechanism of rotation of the cutting knives is equipped with levers hinged to the housing, pins with shaft and rocker arm. The rods are made with a slit and from one end are rigidly connected to the cutting knives, and from the other end to the levers by means of pins which are arranged in slits of the rod with the possibility of movement. The upper ends of the levers are installed with the possibility of movement in the pins whose shafts are arranged with the possibility of rotation in the rocker arm rigidly connected to the drive shaft. The drive shaft is equipped with cantilevers installed in the cap with the possibility of rotation and interaction with the elastic elements.

  9. Computer gaming comes to service rig training

    Energy Technology Data Exchange (ETDEWEB)

    Mowers, J.

    2007-05-15

    This article addressed the challenge of providing service rig workers with a good understanding of the tasks and risks involved in the job before they even step out into the field. The product, SimuLynx was presented. SimuLynx is based on video and gaming technology to immerse the user in the service rig work environment with other crew members. The user tries to perform the different steps of a junior floorhand's job while a coach gives directions. The article discussed how the system works. For example, when faced with a task, the user chooses from several options. The coach informs the virtual junior floorhand if the decision was right or wrong. He will also give warnings and let the user realize the consequences of a wrong action. The benefits of the system were also presented. For example, instead of 30 days of on-the-job training, an employee may only need several days after going through the program. Other benefits that were reviewed included reduced accident risk-levels for new workers; higher rig efficiency; and, lower training costs. In addition, a potential recruit can decide if the job is right for him before signing up for an expensive course or starting off with a service rig company. As well, the rig company can decide if someone is suitable before hiring that person. 3 figs.

  10. Drilling mortar

    Energy Technology Data Exchange (ETDEWEB)

    Theodorescu, V; Ditulescu, E

    1979-01-30

    A method is proposed for producing stable drilling mortar from drilled rock which makes it possible to stabilize the walls of the borehole and to maintain producing horizons of oil and gas wells in an undisturbed state. The proposed drilling mortar includes 5-12 wt.-% dry modified calcium lignosulfonate in the form of a solution containing about 30% dry matter with the addition of 0.1 wt.-% anti-foaming agent consisting of C/sub 19/-C/sub 20/ alcohol dissolved in a light petroleum product; cream of milk with about 10 wt.-% Ca(OH)/sub 2/ in a quantity sufficient for reducing the pH value of the ions down to 10.5; sodium chloride in amounts from 5 mg to 100 ml (aqueous phase); ordinarily used agents for ensuring the necessary density, viscosity, and filterability. For example, the preparation of the drilling fluid begins with the processing under laboratory conditions of lignosulfonic pulp obtained in the production of yeast fodder with the following characteristics: specific density, 1.15 kgf/dm/sup 3/; water content, 67% (according to the Dean and Stark method); pH 4.0. In the vessel is placed 1000 cm/sup 3/ lignosulfonic pulp containing 33% dry matter, and the pulp is heated to 90-95/sup 0/C by means of a water bath. To the heated pulp 33 cm/sup 3/ formic acid at a 40-% concentration is added by mixing. The specific temperature of the pulp is maintained in the constant mixing process for two hours. Then the cream of milk containing 10 wt.-% Ca(OH)/sub 2/ is added to raise the pH to 10.5. The cooled product is calcium lignosulfonate. To produce a stable form of the drilling mortar, 750 g clay and 10 g trass gel are added to a vessel containing 1500 cm/sup 3/ fresh water by means of mixing. The resulting dispersed mass remains at rest for 12 hours for purposes of hydration. Then 2 g of an anti-foaming agent dissolved in 6 cm/sup 3/ benzene is introduced to 1000 cm/sup 3/ modified calcium lignosulfonate produced by the above method.

  11. Automated pipe handling systems for new and retrofit applications in shallow drilling markets

    Energy Technology Data Exchange (ETDEWEB)

    McDougall, P.; Fikowski, L.M. [Blackbird Well Servicing Inc., Calgary, AB (Canada)

    2003-07-01

    This presentation discussed the importance of the human interface as the main element in the development of automated mechanical systems on drilling rigs. Improvements in drilling rig designs are meant to improve manpower efficiencies and performance. The goal for Blackbird Well Servicing is to design automated and integrated processes that can be controlled manually at any point during an operation. Although some drilling operations can be fully automated and fully integrated, certain steps in the process are intentionally left open ended for human intervention. It was concluded that the consistency of performance is the most significant feature of integrated systems and that all drilling contractors should strive for smooth, steady performance rather than brute labour. Speed and efficiency increases with consistent performance. Reliability results in better performance, thereby lowering operating costs and more work for drilling contractors.

  12. Drilling and testing hot, high-pressure wells

    Energy Technology Data Exchange (ETDEWEB)

    MacAndrew, R. (Ranger Oil Ltd, Aberdeen (United Kingdom)); Parry, N. (Phillips Petroleum Company United Kingdom Ltd, Aberdeen (United Kingdom)); Prieur, J.M. (Conoco UK Ltd, Aberdeen (United Kingdom)); Wiggelman, J. (Shell UK Exploration and Production, Aberdeen (United Kingdom)); Diggins, E. (Brunei Shell Petroleum (Brunei Darussalam)); Guicheney, P. (Sedco Forex, Montrouge (France)); Cameron, D.; Stewart, A. (Dowell Schlumberger, Aberdeen (United Kingdom))

    Meticulous planning and careful control of operations are needed to safely drill and test high-temperature, high-pressure (HTHP) wells. Techniques, employed in the Central Graben in the UK sector of the North Sea, where about 50 HTHP wells have been drilled, are examined. Three main areas of activity are covered in this comprehensive review: drilling safety, casing and cementation, and testing. The three issues at the heart of HTHP drilling safety are kick prevention, kick detection and well control. Kicks are influxes of reservoir fluid into the well. Test equipment and operations are divided into three sections: downhole, subsea and surface. Also details are given of how this North Sea experience has been used to help plan a jackup rig modification for hot, high-pressure drilling off Brunei. 16 figs., 32 refs.

  13. Tesco's Bob Tessari: launching a drilling revolution

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2002-07-01

    The 'Casing Drilling' technology, patented by Tesco, which allows operators to simultaneously drill, case and evaluate oil and gas wells, is described. The system is claimed to substantially reduce the amount of lost circulation, loss of well control and bore hole instability problems that have been documented to account for about 25 per cent of total rig time on a well, and at least $4 billion (or 10 per cent of the $40 billion annual global drilling tab) spent on 'unscheduled events' associated with tripping drill pipe. With the Casing Drilling process, wells are drilled using standard oilfield casing instead of drill pipe. The host of downhole problems associated with tripping in and out of the hole are avoided, as the casing pipe is never removed. Instead, drill bits and other downhole tools are tripped through the casing with wireline at a rate of about 500 ft per minute, drastically reducing tripping time. Tesco also developed the portable top drive, the manufacture and rental of which constitutes a large part of the company's business, besides helping technologically to make Casing Drilling possible. Much of the company's success is attributed to the tenacity and zest for innovative approaches of the company's CEO, Bob Tessari, who is largely responsible for the company finding itself at the centre of a drilling technology revolution.

  14. A constructive presentation of rigged Hilbert spaces

    International Nuclear Information System (INIS)

    Celeghini, Enrico

    2015-01-01

    We construct a rigged Hilbert space for the square integrable functions on the line L2(R) adding to the generators of the Weyl-Heisenberg algebra a new discrete operator, related to the degree of the Hermite polynomials. All together, continuous and discrete operators, constitute the generators of the projective algebra io(2). L 2 (R) and the vector space of the line R are shown to be isomorphic representations of such an algebra and, as both these representations are irreducible, all operators defined on the rigged Hilbert spaces L 2 (R) or R are shown to belong to the universal enveloping algebra of io(2). The procedure can be extended to orthogonal and pseudo-orthogonal spaces of arbitrary dimension by tensorialization.Circumventing all formal problems the paper proposes a kind of toy model, well defined from a mathematical point of view, of rigged Hilbert spaces where, in contrast with the Hilbert spaces, operators with different cardinality are allowed. (paper)

  15. Study in flow rig by using radiotracer

    International Nuclear Information System (INIS)

    Widatalla, R. K.

    2012-06-01

    Application of radioisotope technology have proved itself to be effective techniques for troubleshooting and optimizing industrial process in petrochemical industry In this study gamma scanning technique has been employed for better understanding of malfunctions by using the flow rig system. The scanning were carried out using 9 9mT C gamma radiation source with activity of 1 mCi and quantity of 5 ml to measure the flow rate for the water flow rig The experiment was repeated by reducing the data interval time to get more precise result. The investigations were also carried out using 5 ml of 9 9mT C with activity of 0.3 mCi for measuring the Residence Time Distribution (RTD) inside the flow rig tank which enables calculating the effective volume for the operating tank and its dead volume. The results proved that the technique is sensitive, reliable and can be adopted to investigate industrial reactors. (Author)

  16. Drilling mud

    Energy Technology Data Exchange (ETDEWEB)

    Baranovskiy, V D; Brintsev, A I; Gusev, V G; Katenev, Ye P; Pokhorenko, I V

    1979-10-25

    A drilling mud is proposed, which contains a dispersion medium, a dispersion phase, for instance, clay, a stabilizer reagent, for instance, carboxymethylcellulose and a weighter. In order to reduce the viscosity and to increase the stability of the mud it contains as the dispersion medium a 75% aqueous solution of the L-7 reagent. To increase the salt resistance of the mud, it additionally contains sodium chloride in a volume of 4.04.5 percent by weight, and to regulate the alkalinity, it additionally contains sodium hydroxide in a volume of 1.1 to 1.3 percent by weight.

  17. Performance Analysis of Retrofitted Tribo-Corrosion Test Rig for Monitoring In Situ Oil Conditions

    Directory of Open Access Journals (Sweden)

    Arpith Siddaiah

    2017-09-01

    Full Text Available Oils and lubricants, once extracted after use from a mechanical system, can hardly be reused, and should be refurbished or replaced in most applications. New methods of in situ oil and lubricant efficiency monitoring systems have been introduced for a wide variety of mechanical systems, such as automobiles, aerospace aircrafts, ships, offshore wind turbines, and deep sea oil drilling rigs. These methods utilize electronic sensors to monitor the “byproduct effects” in a mechanical system that are not indicative of the actual remaining lifecycle and reliability of the oils. A reliable oil monitoring system should be able to monitor the wear rate and the corrosion rate of the tribo-pairs due to the inclusion of contaminants. The current study addresses this technological gap, and presents a novel design of a tribo-corrosion test rig for oils used in a dynamic system. A pin-on-disk tribometer test rig retrofitted with a three electrode-potentiostat corrosion monitoring system was used to analyze the corrosion and wear rate of a steel tribo-pair in industrial grade transmission oil. The effectiveness of the retrofitted test rig was analyzed by introducing various concentrations of contaminants in an oil medium that usually leads to a corrosive working environment. The results indicate that the retrofitted test rig can effectively monitor the in situ tribological performance of the oil in a controlled dynamic corrosive environment. It is a useful method to understand the wear–corrosion synergies for further experimental work, and to develop accurate predictive lifecycle assessment and prognostic models. The application of this system is expected to have economic benefits and help reduce the ecological oil waste footprint.

  18. Performance Analysis of Retrofitted Tribo-Corrosion Test Rig for Monitoring In Situ Oil Conditions.

    Science.gov (United States)

    Siddaiah, Arpith; Khan, Zulfiqar Ahmad; Ramachandran, Rahul; Menezes, Pradeep L

    2017-09-28

    Oils and lubricants, once extracted after use from a mechanical system, can hardly be reused, and should be refurbished or replaced in most applications. New methods of in situ oil and lubricant efficiency monitoring systems have been introduced for a wide variety of mechanical systems, such as automobiles, aerospace aircrafts, ships, offshore wind turbines, and deep sea oil drilling rigs. These methods utilize electronic sensors to monitor the "byproduct effects" in a mechanical system that are not indicative of the actual remaining lifecycle and reliability of the oils. A reliable oil monitoring system should be able to monitor the wear rate and the corrosion rate of the tribo-pairs due to the inclusion of contaminants. The current study addresses this technological gap, and presents a novel design of a tribo-corrosion test rig for oils used in a dynamic system. A pin-on-disk tribometer test rig retrofitted with a three electrode-potentiostat corrosion monitoring system was used to analyze the corrosion and wear rate of a steel tribo-pair in industrial grade transmission oil. The effectiveness of the retrofitted test rig was analyzed by introducing various concentrations of contaminants in an oil medium that usually leads to a corrosive working environment. The results indicate that the retrofitted test rig can effectively monitor the in situ tribological performance of the oil in a controlled dynamic corrosive environment. It is a useful method to understand the wear-corrosion synergies for further experimental work, and to develop accurate predictive lifecycle assessment and prognostic models. The application of this system is expected to have economic benefits and help reduce the ecological oil waste footprint.

  19. Reduced abrasion drilling fluid

    NARCIS (Netherlands)

    2010-01-01

    A reduced abrasion drilling fluid system and method of drilling a borehole by circulating the reduced abrasion drilling fluid through the borehole is disclosed. The reduced abrasion drilling fluid comprises a drilling fluid, a first additive and a weighting agent, wherein the weighting agent has a

  20. Reduced abrasion drilling fluid

    NARCIS (Netherlands)

    2012-01-01

    A reduced abrasion drilling fluid system and method of drilling a borehole by circulating the reduced abrasion drilling fluid through the borehole is disclosed. The reduced abrasion drilling fluid comprises a drilling fluid, a first additive and a weighting agent, wherein the weighting agent has a

  1. LWR primary coolant pipe rupture test rig

    International Nuclear Information System (INIS)

    Yoshitoshi, Shyoji

    1978-01-01

    The rupture test rig for primary coolant pipes is constructed in the Japan Atomic Energy Research Institute to verify the reliability of the primary coolant pipes for both PWRs and BWRs. The planned test items consisted of reaction force test, restraint test, whip test, jet test and continuous release test. A pressure vessel of about 4 m 3 volume, a circulating pump, a pressurizer, a heater, an air cooler and the related instrumentation and control system are included in this test rig. The coolant test condition is 160 kg/cm 2 g, 325 deg C for PWR test, and 70 kg/cm 2 g, saturated water and steam for BWR test, 100 ton of test load for the ruptured pipe bore of 8B Schedule 160, and 20 lit/min. discharge during 20 h for continuous release of coolant. The maximum pit internal pressure was estimated for various pipe diameters and time under the PWR and BWR conditions. The spark rupturing device was adopted for the rupture mechanics in this test rig. The computer PANAFACOM U-300 is used for the data processing. This test rig is expected to operate in 1978 effectively for the improvement of reliability of LWR primary coolant pipes. (Nakai, Y.)

  2. W. Canada boom to outshine second half U.S. drilling rise

    International Nuclear Information System (INIS)

    Petzet, G.A.; Beck, R.J.

    1994-01-01

    Drilling in the US will pick up slightly during second half 1994, but the first half to second half increase proportionally will not be as large as in Canada. Operators appear likely to drill nearly half as many wells this year in western Canada as they will drill in the US. Oil and Gas Journal estimates that drilling and completion spending will total $9.511 billion in the US this year, up about one third of 1% from spending in 1993. This steady investment is forecast despite a 2.3% drop in expected wellhead revenue to $72.53 billion. Highlights to OGJ's midyear drilling forecast for 1994 include: operators will drill 24,705 wells, compared with the 26,840 OGJ estimated in its early year forecast before the slump in crude oil prices; the active rotary rig count will average 810 rigs, 7% higher than in 1993; operators will drill about 3,684 wildcats, down from the 4,170 that OGJ predicted in January; the surveyed group of major operators will drill 3,091 wells in the US, including 246 exploratory wells; and drilling in western Canada will total a year record 11,531 wells, dwarfing the 4,654 wells drilled in 1992

  3. Endurance test of DUPIC irradiation test rig-003

    Energy Technology Data Exchange (ETDEWEB)

    Moon, J.S; Yang, M.S.; Lee, C.Y.; Ryu, J.S.; Jeon, H.G

    2001-04-01

    This report presents the pressure drop, vibration and endurance test results for DUPIC Irradiation Test Rig-003 which was design and fabricated by KAERI. From the pressure drop and vibration test results, it is verified that DUPIC Irradiation Test Rig-003 satisfied the limit conditions of HANARO. And, remarkable wear is not observed in DUPIC Irradiation Test Rig-003 during 40 endurance test days.

  4. Wellsite computers--their increasing role in drilling operations

    International Nuclear Information System (INIS)

    Keenan, P.G.; Dyson, P.M.

    1981-01-01

    The increasing expense and complexity of exploration drilling, coupled with rapid advances in computer and microprocessor technology, have led to the development of computer-assisted wellsite logging units from their humble beginnings as simple hot wire gas detectors. The main applications of this technology can be recognized in the following areas: (a) Safety of wellsite personnel, rig and downhole equipment. (b) Increased drilling efficiency with the resultant time and cost savings. (c) Simulation of possible events allowing comparisons between actual and expected data to assist decision making at the wellsite. (d) Storage of data on tape/disk to allow rapid retrieval of data for postwell analysis and report production. 6 refs

  5. RELATION OF DRILLING CAPACITY TO MARKET AND PROFIT

    Directory of Open Access Journals (Sweden)

    Mladen Zelenika

    1994-12-01

    Full Text Available Owner of drilling rigs should employ highly professional officers, who are capable to manage profit-orientated operations at all stages and make accurate analyses of the next three questions: how to deploy drilling crews to achieve the highest financial result; which kinds of equipment are compatible and employable in profitable operations, and how to compute the requirement of each type of equipment, and the number of drilling crews for a defined period and region to have profitable service. This paper introduce an original mathematical model convenient to compute exact values needed for an answer on these three questions. Application of this model is obvious for research of the relationship among: (i performance and cost of available drilling rigs, (ii condition on the market, and (iii estimated profit. Utilization of this model is possible only if records of market conditions' data, and data relating to progress and cost of operations in different conditions are established. These records will facilitate accurate estimation of input parameters' values and computation of output parameters' values using the Mathematical Model. Results of these computation should give basic data Tor precise plan of operation, rentabili-ty, and figures to decide the strategy of Drilling Company's capacity development.

  6. Optimizing drilling performance using a selected drilling fluid

    Science.gov (United States)

    Judzis, Arnis [Salt Lake City, UT; Black, Alan D [Coral Springs, FL; Green, Sidney J [Salt Lake City, UT; Robertson, Homer A [West Jordan, UT; Bland, Ronald G [Houston, TX; Curry, David Alexander [The Woodlands, TX; Ledgerwood, III, Leroy W.

    2011-04-19

    To improve drilling performance, a drilling fluid is selected based on one or more criteria and to have at least one target characteristic. Drilling equipment is used to drill a wellbore, and the selected drilling fluid is provided into the wellbore during drilling with the drilling equipment. The at least one target characteristic of the drilling fluid includes an ability of the drilling fluid to penetrate into formation cuttings during drilling to weaken the formation cuttings.

  7. Jet Exit Rig Six Component Force Balance

    Science.gov (United States)

    Castner, Raymond; Wolter, John; Woike, Mark; Booth, Dennis

    2012-01-01

    A new six axis air balance was delivered to the NASA Glenn Research Center. This air balance has an axial force capability of 800 pounds, primary airflow of 10 pounds per second, and a secondary airflow of 3 pounds per second. Its primary use was for the NASA Glenn Jet Exit Rig, a wind tunnel model used to test both low-speed, and high-speed nozzle concepts in a wind tunnel. This report outlines the installation of the balance in the Jet Exit Rig, and the results from an ASME calibration nozzle with an exit area of 8 square-inches. The results demonstrated the stability of the force balance for axial measurements and the repeatability of measurements better than 0.20 percent.

  8. A Graphical Adversarial Risk Analysis Model for Oil and Gas Drilling Cybersecurity

    OpenAIRE

    Vieira, Aitor Couce; Houmb, Siv Hilde; Insua, David Rios

    2014-01-01

    Oil and gas drilling is based, increasingly, on operational technology, whose cybersecurity is complicated by several challenges. We propose a graphical model for cybersecurity risk assessment based on Adversarial Risk Analysis to face those challenges. We also provide an example of the model in the context of an offshore drilling rig. The proposed model provides a more formal and comprehensive analysis of risks, still using the standard business language based on decisions, risks, and value.

  9. A Graphical Adversarial Risk Analysis Model for Oil and Gas Drilling Cybersecurity

    Directory of Open Access Journals (Sweden)

    Aitor Couce Vieira

    2014-04-01

    Full Text Available Oil and gas drilling is based, increasingly, on operational technology, whose cybersecurity is complicated by several challenges. We propose a graphical model for cybersecurity risk assessment based on Adversarial Risk Analysis to face those challenges. We also provide an example of the model in the context of an offshore drilling rig. The proposed model provides a more formal and comprehensive analysis of risks, still using the standard business language based on decisions, risks, and value.

  10. Learning by Drilling: Interfirm Learning and Relationship Persistence in the Texas Oilpatch

    OpenAIRE

    Ryan Kellogg

    2011-01-01

    This article examines learning-by-doing that is specific not just to individual firms but to pairs of firms working together in a contracting relationship. Using data from the oil and gas industry, I find that the productivity of an oil production company and its drilling contractor increases with their joint experience. This learning is relationship-specific: drilling rigs cannot fully appropriate the productivity gains acquired through experience with one production company to their work fo...

  11. Learning by Drilling: Inter-Firm Learning and Relationship Persistence in the Texas Oilpatch

    OpenAIRE

    Ryan Kellogg

    2009-01-01

    This paper examines the importance of learning-by-doing that is specific not just to individual firms, but to pairs of firms working together in a contracting relationship. Using new, detailed data from the oil and gas industry, I find that the joint productivity of an oil production company and its drilling contractor is enhanced significantly as they accumulate experience working together. This learning is relationship-specific: drilling rigs generally cannot fully appropriate the productiv...

  12. Advanced Mud System for Microhole Coiled Tubing Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth Oglesby

    2008-12-01

    An advanced mud system was designed and key components were built that augment a coiled tubing drilling (CTD) rig that is designed specifically to drill microholes (less than 4-inch diameter) with advanced drilling techniques. The mud system was tailored to the hydraulics of the hole geometries and rig characteristics required for microholes and is capable of mixing and circulating mud and removing solids while being self contained and having zero discharge capability. Key components of this system are two modified triplex mud pumps (High Pressure Slurry Pumps) for advanced Abrasive Slurry Jetting (ASJ) and a modified Gas-Liquid-Solid (GLS) Separator for well control, flow return and initial processing. The system developed also includes an additional component of an advanced version of ASJ which allows cutting through most all materials encountered in oil and gas wells including steel, cement, and all rock types. It includes new fluids and new ASJ nozzles. The jetting mechanism does not require rotation of the bottom hole assembly or drill string, which is essential for use with Coiled Tubing (CT). It also has low reactive forces acting on the CT and generates cuttings small enough to be easily cleaned from the well bore, which is important in horizontal drilling. These cutting and mud processing components and capabilities compliment the concepts put forth by DOE for microhole coiled tubing drilling (MHTCTD) and should help insure the reality of drilling small diameter holes quickly and inexpensively with a minimal environmental footprint and that is efficient, compact and portable. Other components (site liners, sump and transfer pumps, stacked shakers, filter membranes, etc.. ) of the overall mud system were identified as readily available in industry and will not be purchased until we are ready to drill a specific well.

  13. CASING DRILLING TECHNOLOGY

    Directory of Open Access Journals (Sweden)

    Nediljka Gaurina-Međimurec

    2005-12-01

    Full Text Available Casing drilling is an alternative option to conventional drilling and uses standard oilfield casing instead of drillstring. This technology is one of the greatest developments in drilling operations. Casing drilling involves drilling and casing a well simultaneously. In casing driling process, downhole tools can be retrieved, through the casing on wire-line, meaning tool recovery or replacement of tools can take minutes versus hours under conventional methods. This process employs wireline-retrievable tools and a drill-lock assembly, permitting bit and BHA changes, coring, electrical logging and even directional or horizontal drilling. Once the casing point is reached, the casing is cemented in place without tripping pipe.

  14. The Brimmond Reservoir extending the Forties Field into the millenium by maximizing profits without extensive rig upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Smith, L.; Perras, L. [Noble Drilling (United Kingdom)

    1998-12-31

    Drilling a horizontal well with a minimum facilities workover rig in the Brimmond Field (North Sea) which overlies the Forties Reservoir, was described. Feasibility studies indicated that further development of the Brimmond Field would require extensive rig upgrade to be able to drill the horizontal well within recognized industry parameters. Since the upgrading of the drilling package would have delayed the project by several months, as well as making it uneconomical, a number of critical operations were identified and analyzed, which led to introducing `new technology` - premixed cement, leading edge LWD tools and hole cleanup techniques. The first horizontal sidetrack was successfully completed with the minimum facilities drilling package and production commenced at an initial rate of 2.4 mbd dry oil from a 13 ft cased hole gravel pack utilizing an existing Forties Field producing well. The original Paleocene interval was abandoned with cement plugs prior to milling a window on the 9-5/8 inch casing and installing a gravel pack. Steady production of this new well led to consideration of further development of the field. 4 figs.

  15. Field Testing of Environmentally Friendly Drilling System

    Energy Technology Data Exchange (ETDEWEB)

    David Burnett

    2009-05-31

    The Environmentally Friendly Drilling (EFD) program addresses new low-impact technology that reduces the footprint of drilling activities, integrates light weight drilling rigs with reduced emission engine packages, addresses on-site waste management, optimizes the systems to fit the needs of a specific development sites and provides stewardship of the environment. In addition, the program includes industry, the public, environmental organizations, and elected officials in a collaboration that addresses concerns on development of unconventional natural gas resources in environmentally sensitive areas. The EFD program provides the fundamentals to result in greater access, reasonable regulatory controls, lower development cost and reduction of the environmental footprint associated with operations for unconventional natural gas. Industry Sponsors have supported the program with significant financial and technical support. This final report compendium is organized into segments corresponding directly with the DOE approved scope of work for the term 2005-2009 (10 Sections). Each specific project is defined by (a) its goals, (b) its deliverable, and (c) its future direction. A web site has been established that contains all of these detailed engineering reports produced with their efforts. The goals of the project are to (1) identify critical enabling technologies for a prototype low-impact drilling system, (2) test the prototype systems in field laboratories, and (3) demonstrate the advanced technology to show how these practices would benefit the environment.

  16. Advanced Drilling through Diagnostics-White-Drilling

    International Nuclear Information System (INIS)

    FINGER, JOHN T.; GLOWKA, DAVID ANTHONY; LIVESAY, BILLY JOE; MANSURE, ARTHUR J.; PRAIRIE, MICHAEL R.

    1999-01-01

    A high-speed data link that would provide dramatically faster communication from downhole instruments to the surface and back again has the potential to revolutionize deep drilling for geothermal resources through Diagnostics-While-Drilling (DWD). Many aspects of the drilling process would significantly improve if downhole and surface data were acquired and processed in real-time at the surface, and used to guide the drilling operation. Such a closed-loop, driller-in-the-loop DWD system, would complete the loop between information and control, and greatly improve the performance of drilling systems. The main focus of this program is to demonstrate the value of real-time data for improving drilling. While high-rate transfer of down-hole data to the surface has been accomplished before, insufficient emphasis has been placed on utilization of the data to tune the drilling process to demonstrate the true merit of the concept. Consequently, there has been a lack of incentive on the part of industry to develop a simple, low-cost, effective high-speed data link. Demonstration of the benefits of DWD based on a high-speed data link will convince the drilling industry and stimulate the flow of private resources into the development of an economical high-speed data link for geothermal drilling applications. Such a downhole communication system would then make possible the development of surface data acquisition and expert systems that would greatly enhance drilling operations. Further, it would foster the development of downhole equipment that could be controlled from the surface to improve hole trajectory and drilling performance. Real-time data that would benefit drilling performance include: bit accelerations for use in controlling bit bounce and improving rock penetration rates and bit life; downhole fluid pressures for use in the management of drilling hydraulics and improved diagnosis of lost circulation and gas kicks; hole trajectory for use in reducing directional

  17. Injecting rabies immunoglobulin (RIG) into wounds only: A significant saving of lives and costly RIG.

    Science.gov (United States)

    Bharti, Omesh Kumar; Madhusudana, Shampur Narayan; Wilde, Henry

    2017-04-03

    An increasing number of dog bite victims were being presented to public hospitals in Himachal Pradesh in 2014 amidst virtual non availability of any rabies immunoglobulin (RIG). Only a small quantity of equine rabies immunoglobulin (eRIG) was available from the government owned Central Research Institute (CRI) Kasauli. This available eRIG was used in 269 patients as an emergency response and only for local infiltration of severe bite wounds by suspected rabid dogs. This was followed by rabies vaccination, using the WHO approved intra-dermal Thai Red Cross Society vaccination schedule. A subgroup of 26 patients were later identified who had been severely bitten by laboratory confirmed rabid dogs. They were followed for more than one year and all were found to be alive.

  18. Level best : drilling seasonal load leveling business case : final report

    International Nuclear Information System (INIS)

    2005-10-01

    Drilling and seismic costs in Western Canada are as much as 35 per cent higher during winter months. Favourable commodity pricing has prompted aggressive expansion of drilling programs in the Western Canada Sedimentary Basin (WCSB), and capacity is becoming a significant issue. Many operators are turning to load leveling in order to secure rigs and crew availability. However, many operators still adhere to the traditional view that drilling of oil and gas wells is best accomplished during the winter. The purpose of the project discussed in this paper was to develop and present a business case for greater seasonal load leveling in the WCSB and spreading it more evenly throughout the year. Using calendar year quarters, publicly available data for a 5 year period from 2000-2004 for drilling activity, safety, weather, and environmental restrictions were examined. A list of candidate fields with high levels of activity and a good representation of well depths was selected. Well cost and rig data from 14 different companies was used. A variety of industry participants, drilling contractors, load leveling technology suppliers and provincial agencies were consulted to supplement well cost analyses. The financial impacts of load leveling were examined. Benefits included lower well costs; advanced production; avoided rig construction; reduced incident rates; and reduced turnover. While the focus of the business case for load leveling was based on hard cost data, many indirect benefits were identified, including First Nations sustainability and greater job security and comfort for workers. Various policies and incentives that encouraged load leveling in British Columbia and Alberta were reviewed. 57 figs

  19. Endurance test on IR rig for RI production

    International Nuclear Information System (INIS)

    Chung, Heung June; Youn, Y. J.; Han, H. S.; Hong, S. B.; Cho, Y. G.; Ryu, J. S.

    2000-12-01

    This report presents the pressure drop, vibration and endurance test results for IR rig for RI production which were desigened and fabricated by KAERI. From the pressure drop test results, it is noted that the flow rate through the IR rig corresponding to the pressure drop of 200 kPa is measured to be about 3.12 kg/sec. Vibration frequency for the IR rig ranges from 13 to 17 Hz. RMS(Root Mean Square) displacement for the IR rig is less than 30 μm, and the maximum displacement is less than 110μm. These experimental results show that the design criteria of IR rig meet the HANARO limit conditions. Endurance test results show that the appreciable fretting wear for the IR rig does not occur, however tiny trace of wear between contact points is observed

  20. Resonances, scattering theory and rigged Hilbert spaces

    International Nuclear Information System (INIS)

    Parravicini, G.; Gorini, V.; Sudarshan, E.C.G.

    1979-01-01

    The problem of decaying states and resonances is examined within the framework of scattering theory in a rigged Hilbert space formalism. The stationary free, in, and out eigenvectors of formal scattering theory, which have a rigorous setting in rigged Hilbert space, are considered to be analytic functions of the energy eigenvalue. The value of these analytic functions at any point of regularity, real or complex, is an eigenvector with eigenvalue equal to the position of the point. The poles of the eigenvector families give origin to other eigenvectors of the Hamiltonian; the singularities of the out eigenvector family are the same as those of the continued S matrix, so that resonances are seen as eigenvectors of the Hamiltonian with eigenvalue equal to their location in the complex energy plane. Cauchy theorem then provides for expansions in terms of complete sets of eigenvectors with complex eigenvalues of the Hamiltonian. Applying such expansions to the survival amplitude of a decaying state, one finds that resonances give discrete contributions with purely exponential time behavior; the background is of course present, but explicitly separated. The resolvent of the Hamiltonian, restricted to the nuclear space appearing in the rigged Hilbert space, can be continued across the absolutely continuous spectrum; the singularities of the continuation are the same as those of the out eigenvectors. The free, in and out eigenvectors with complex eigenvalues and those corresponding to resonances can be approximated by physical vectors in the Hilbert space, as plane waves can. The need for having some further physical information in addition to the specification of the total Hamiltonian is apparent in the proposed framework. The formalism is applied to the Lee-Friedrichs model. 48 references

  1. Unstable quantum states and rigged Hilbert spaces

    International Nuclear Information System (INIS)

    Gorini, V.; Parravicini, G.

    1978-10-01

    Rigged Hilbert space techniques are applied to the quantum mechanical treatment of unstable states in nonrelativistic scattering theory. A method is discussed which is based on representations of decay amplitudes in terms of expansions over complete sets of generalized eigenvectors of the interacting Hamiltonian, corresponding to complex eigenvalues. These expansions contain both a discrete and a continuum contribution. The former corresponds to eigenvalues located at the second sheet poles of the S matrix, and yields the exponential terms in the survival amplitude. The latter arises from generalized eigenvectors associated to complex eigenvalues on background contours in the complex plane, and gives the corrections to the exponential law. 27 references

  2. Robotic Planetary Drill Tests

    Science.gov (United States)

    Glass, Brian J.; Thompson, S.; Paulsen, G.

    2010-01-01

    Several proposed or planned planetary science missions to Mars and other Solar System bodies over the next decade require subsurface access by drilling. This paper discusses the problems of remote robotic drilling, an automation and control architecture based loosely on observed human behaviors in drilling on Earth, and an overview of robotic drilling field test results using this architecture since 2005. Both rotary-drag and rotary-percussive drills are targeted. A hybrid diagnostic approach incorporates heuristics, model-based reasoning and vibration monitoring with neural nets. Ongoing work leads to flight-ready drilling software.

  3. The role of the rigged Hilbert space in quantum mechanics

    International Nuclear Information System (INIS)

    Madrid, Rafael de la

    2005-01-01

    There is compelling evidence that, when a continuous spectrum is present, the natural mathematical setting for quantum mechanics is the rigged Hilbert space rather than just the Hilbert space. In particular, Dirac's braket formalism is fully implemented by the rigged Hilbert space rather than just by the Hilbert space. In this paper, we provide a pedestrian introduction to the role the rigged Hilbert space plays in quantum mechanics, by way of a simple, exactly solvable example. The procedure will be constructive and based on a recent publication. We also provide a thorough discussion on the physical significance of the rigged Hilbert space

  4. Eigenfunction expansions and scattering theory in rigged Hilbert spaces

    Energy Technology Data Exchange (ETDEWEB)

    Gomez-Cubillo, F [Dpt. de Analisis Matematico, Universidad de Valladolid. Facultad de Ciencias, 47011 Valladolid (Spain)], E-mail: fgcubill@am.uva.es

    2008-08-15

    The work reviews some mathematical aspects of spectral properties, eigenfunction expansions and scattering theory in rigged Hilbert spaces, laying emphasis on Lippmann-Schwinger equations and Schroedinger operators.

  5. Environmental assessment of exploration drilling off Nova Scotia: executive summary

    International Nuclear Information System (INIS)

    2000-01-01

    The environmental assessment project of drilling offshore Nova Scotia covers year-around drilling conducted from jackup rigs, semi-submersible rigs, and drill ships that use the methods described in the project description on the Scotian Shelf, the Laurentian Channel and St, Pierre Bank. The assessment was sponsored by all the oil companies active in the area, namely Mobil Oil Canada, Shell Canada, Imperial Oil Resources, Gulf Canada Resources, Chevron Canada Resources, PanCanadian Petroleum, Murphy Oil Company and Norsk Hydro Canada Oil and Gas. This summary describes the impact assessment methodology used, provides a description of the project, reviews the cumulative impact, and the impacts of discrete activities such as noise and disturbances, operational discharges of oil, disruption of the benthos, garbage and waste disposal, and accidental oil spills, and outlines mitigation and monitoring activities to deal with the impacts. Mitigation measures encompass routine discharges, accidental oil spills, spill response, monitoring activities, contingency plans and an overall environmental protection plan. In addition to this generic assessment, the consultants recommend that individual exploration drilling programs that fall outside of the parameters outlined in the generic environmental assessment document, be required to undergo a program-specific assessment that focuses on those aspects of the proposed program that differ from the parameters prescribed in the present document. 9 refs

  6. You say you want a revolution: casing drilling targets 30 per cent well-cost saving

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.; Marsters, S.

    1999-10-01

    Casing drilling is a new method of drilling that eliminates drill strings by using standard casing to simultaneously drill and case wells. Tesco Corporation of Calgary acquired patent rights to casing drilling technology in 1995. The company now offers a conversion kit for existing drill rigs as well a new compact casing drilling rig for shallow markets. The single derrick will be rated at 1,500 meters, but initially it will be used to drill 700-800 meter gas wells in southeast Alberta. Some cost savings will be realized at these shallow depths, but the real cost saving advantages will be realized on deep holes. In the meantime, improvements are planned to the cutting structures of the under-rimming bit to increase safety and withstand higher torque loads. It will be also necessary to adapt techniques such as directional drilling and logging to the casing drilling conveyance mechanism which has been only partially successful thus far, especially in the retrieving mode. Another challenge already met, involved ensuring that casing could be run in high-compression loads without damage to connections. Despite these problems, the system attracted considerable attention with several international companies placing orders for immediate delivery. Another system, this one developed by Sperry-Sun Drilling Services and known as a 'casing while drilling' (CWD) system, is strictly a downhole assembly and is targeted for offshore use and deeper vertical holes. This system is currently being tested in two commercial operations in offshore Indonesia for Unocal Corporation. Despite numerous problems to fill casing with fluid during connections, penetration rates of 300-400 feet per hour were achieved.

  7. Results of the marine biota monitoring during drilling activity on Campos Basin, Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Petta, Claudia Brigagao de; Bastos, Fabio; Danielski, Monica; Ferreira, Mariana; Gama, Mariana; Coelho, Ana Paula Athanazio; Maia, Decio [Aecom do Brasil Ltda, Rio de Janeiro, RJ (Brazil)

    2012-07-01

    The Environmental Monitoring Project (PMA) aims to report environmental changes arising from drilling activity, in relation to the marine fauna. This project can also help in the monitoring of accidental spills. Since the professionals spend six hours of the day monitoring the ocean around the rigs, they can locate and identify oil stains, notify the responsible onboard, and also help in the monitoring of the oil stain. Such Project has been developed onboard a drilling unit working in Campos Basin. The results presented here were collected during the drilling activity in Bijupira and Salema fields, by Shell Brasil Petroleo Ltda, from July 13th to October 8th, 2011.

  8. Study for increasing micro-drill reliability by vibrating drilling

    International Nuclear Information System (INIS)

    Yang Zhaojun; Li Wei; Chen Yanhong; Wang Lijiang

    1998-01-01

    A study for increasing micro-drill reliability by vibrating drilling is described. Under the experimental conditions of this study it is observed, from reliability testing and the fitting of a life-distribution function, that the lives of micro-drills under ordinary drilling follow the log-normal distribution and the lives of micro-drills under vibrating drilling follow the Weibull distribution. Calculations for reliability analysis show that vibrating drilling can increase the lives of micro-drills and correspondingly reduce the scatter of drill lives. Therefore, vibrating drilling increases the reliability of micro-drills

  9. The Hans Tausen drill

    DEFF Research Database (Denmark)

    Johnsen, Sigfus Johann; Dahl-Jensen, Dorthe; Steffensen, Jørgen Peder

    2007-01-01

    In the mid-1990s, excellent results from the GRIP and GISP2 deep drilling projects in Greenland opened up funding for continued ice-coring efforts in Antarctica (EPICA) and Greenland (NorthGRIP). The Glaciology Group of the Niels Bohr Institute, University of Copenhagen, was assigned the task...... of providing drilling capability for these projects, as it had done for the GRIP project. The group decided to further simplify existing deep drill designs for better reliability and ease of handling. The drill design decided upon was successfully tested on Hans Tausen Ice Cap, Peary Land, Greenland, in 1995....... The 5.0 m long Hans Tausen (HT) drill was a prototype for the ~11 m long EPICA and NorthGRIP versions of the drill which were mechanically identical to the HT drill except for a much longer core barrel and chips chamber. These drills could deliver up to 4 m long ice cores after some design improvements...

  10. The parameters of free play of light drilling installations with varying configuration of the floating base

    Energy Technology Data Exchange (ETDEWEB)

    Putov, B.I.

    1980-01-01

    A reduction in the free play may be achieved through the rational selection of the basic dimensions of the body elements, the disposition of the bodies one relative to the other and by the use of various means for passive stabilization. In the design of MPBU not only the mean values of the free play parameters, which characterize a floating base from the point of view of the time people stay on it, must be available, but also the maximal possible values of the parameters with one and the same wave state, which determine the safety of the operation of the drilling equipment. Studies in installations of various standard off shore drilling rigs showed that the mean values of the free play parameters for all off shore drilling rigs with wave heights from 0.8 to 1.2 meters are half the maximal values.

  11. South African drilling

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    According to the president of the South African Drilling Association, the drilling industry is meeting head-on the challenges created by the worldwide recession. The paper is a synopsis of several of the papers presented at the SADA symposium and a look at several mining-related drilling projects in South Africa. These papers include grouting techniques, the use of impregnated bits in hard rock drilling, tunnel boring for mines, surveying improvement methods and the use of explosives to increase groundwater yield

  12. Taking aim : particle impact drilling targets ROP gains

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, J.

    2005-11-01

    Details of a new drilling technique developed by Particle Drilling Technologies Inc. were presented. Particle impact drilling uses buckshot-like steel particles entrained with ordinary drilling mud that are accelerated through a specially-designed drill bit to bombard hard-rock formations at rapid-fire velocities of up to 4 million times a minute. Conventional drill bits rely on mechanical energy from some 50,000 pounds of weight on bit and torque to break or fracture the formation, whereas particle impact drilling relies on hydraulic energy to blast the steel particles from the bit's jetting nozzles in order to repeatedly fracture the formation. It was suggested that the new technology will accelerate the drilling process. Tests have shown that the new device out-performs conventional bits in hard formations by utilizing the hydraulics of the rig to drill with particles. In field tests, drilling was 4 times faster than conventional methods. It was anticipated that the bit will be up to 150 per cent faster in softer rock formations. In order to avoid clogging, the system uses a shot trap to remove the steel balls, which are roughly one-tenth of an inch in diameter, from the drilling fluid before it enters the shale shaker. The shot is recycled after each well. During drilling, mud circulation must be continuous for the system to work. If the system can't circulate cleanly out of a hole, there is a disruption in the process and drilling fluid may move up the annulus at 350 feet per minute when it leaves bottomhole. It was suggested that circulation issues can be resolved by increasing mud viscosity. A less than optimal performance during a recent test at Catoosa was attributed to a lack of control over drilling fluid parameters and to the use of an overly-large well casing. It was concluded that the new system will likely greatly reduce the number of days it takes to drill a well. 2 figs.

  13. Life extension of semi-submersible drilling unit

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, I.; Sinclair, C.I.K. [TWI, Cambridge (United Kingdom). Structural Integrity Dept.; Magne, E. [Schlumberger Sedco Forex, Montrouge (France)

    1995-12-31

    This paper describes the life extension of a semi-submersible drilling rig built in the early 1970`s. A nominal design life of 20 years was estimated at the time of building; however, in the interim period, numerous improvements have been made in fatigue life estimation ad life improvement techniques, raising the possibility that a further 20 years of operation could be considered. The life extension strategy made use of a number of aspects of offshore technology which were not available at the time of construction of the rig. Finite element studies and results from offshore research programs were used to gauge the effect of fatigue life improvement techniques. The program demonstrated the feasibility of extending the operation of the rig for a further 20 years, with the interval between in-service inspection increased to every five years. It also provided a valuable database of fracture toughness data for the rig materials, which may be used in future work to address reliability issues.

  14. Exploration Drilling and Technology Demonstration At Fort Bliss

    Energy Technology Data Exchange (ETDEWEB)

    Barker, Ben; Moore, Joe [EGI; Segall, Marylin; Nash, Greg; Simmons, Stuart; Jones, Clay; Lear, Jon; Bennett, Carlon

    2014-02-26

    The Tularosa-Hueco basin in south-central New Mexico has long been known as an extensional area of high heat flow. Much of the basin is within the Fort Bliss military reservation, which is an exceptionally high value customer for power independent of the regional electric grid and for direct use energy in building climate control. A series of slim holes drilled in the 1990s established the existence of a thermal anomaly but not its practical value. This study began in 2009 with a demonstration of new exploration drilling technology. The subsequent phases reported here delivered a useful well, comparative exploration data sets and encouragement for further development. A production-size well, RMI56-5, was sited after extensive study of archival and newly collected data in 2010-2011. Most of 2012 was taken up with getting state and Federal authorities to agree on a lead agency for permitting purposes, getting a drilling permit and redesigning the drilling program to suit available equipment. In 2013 we drilled, logged and tested a 924 m well on the McGregor Range at Fort Bliss using a reverse circulation rig. Rig tests demonstrated commercial permeability and the well has a 7-inch slotted liner for use either in production or injection. An August 2013 survey of the completed well showed a temperature of 90 C with no reversal, the highest such temperature in the vicinity. The well’s proximity to demand suggests a potentially valuable resource for direct use heat and emergency power generation. The drilling produced cuttings of excellent size and quality. These were subjected to traditional analyses (thin sections, XRD) and to the QEMScan™ for comparison. QEMScan™ technology includes algorithms for determining such properties of rocks as density, mineralogy, heavy/light atoms, and porosity to be compared with direct measurements of the cuttings. In addition to a complete cuttings set, conventional and resistivity image logs were obtained in the open hole before

  15. Methods and apparatus for safely handling radioactive sources in measuring-while-drilling tools

    International Nuclear Information System (INIS)

    Wraight, P.D.

    1989-01-01

    This patent describes a method for removing a chemical radioactive source from a MWD tool which is coupled in a drill string supported by a drilling rig while a borehole is drilled and includes logging means for measuring formation characteristics in response to irradiation of the adjacent formations by the radioactive source during the drilling operation. The steps of the method are: halting the drilling operation and then removing the drill string from the borehole for moving the MWD tool to a work station at the surface where the source is at a safe working distance from the drilling rig and will be accessible by way of one end of the MWD tool; positioning a radiation shield at a location adjacent to the one end of the MWD tool where the shield is ready for receiving the source as it is moved away from the other end of the MWD tool and then moving the source away from the other end of the MWD tool for enclosing the source within the shield; and once the source is enclosed within the shield; removing the shield together with the enclosed source from the MWD tool for transferring the enclosed source to another work station

  16. Technologies in deep and ultra-deep well drilling: Present status, challenges and future trend in the 13th Five-Year Plan period (2016–2020

    Directory of Open Access Journals (Sweden)

    Haige Wang

    2017-09-01

    Full Text Available During the 12th Five-Year Plan period (2011–2015, CNPC independently developed a series of new drilling equipment, tools and chemical materials for deep and ultra-deep wells, including six packages of key drilling equipment: rigs for wells up to 8000 m deep, quadruple-joint-stand rigs, automatic pipe handling devices for rigs for wells being 5000/7000 m deep, managed pressure drilling systems & equipment, gas/fuel alternative combustion engine units, and air/gas/underbalanced drilling systems; seven sets of key drilling tools: automatic vertical well drilling tools, downhole turbine tools, high-performance PDC bits, hybrid bits, bit jet pulsation devices, no-drilling-surprise monitoring system, & casing running devices for top drive; and five kinds of drilling fluids and cementing slurries: high temperature and high density water-based drilling fluids, oil-based drilling fluids, high temperature and large temperature difference cementing slurry, and ductile cement slurry system. These new development technologies have played an important role in supporting China's oil and gas exploration and development business. During the following 13th Five-Year Plan period (2016–2020, there are still many challenges to the drilling of deep and ultra-deep wells, such as high temperatures, high pressures, narrow pressure window, wellbore integrity and so on, as well as the enormous pressure on cost reduction and efficiency improvement. Therefore, the future development trend will be focused on the development of efficient and mobile rigs, high-performance drill bits and auxiliary tools, techniques for wellbore integrity and downhole broadband telemetry, etc. In conclusion, this study will help improve the ability and level of drilling ultra-deep wells and provide support for oil and gas exploration and development services in China. Keywords: Deep well, Ultra-deep well, Drilling techniques, Progress, Challenge, Strategy, CNPC

  17. Advisory expert system for test rig operator

    International Nuclear Information System (INIS)

    Zielczynski, P.

    1994-01-01

    The advisory expert system MAESTRO (Modular Advisory Expert System for Test Rig Operator) has been designed to guide the operator of large experimental installation during start-up, steady state and shut down. The installation is located in the research reactor MARIA in the Institute of Atomic Energy in Swierk, Poland. The system acquires and analyses on line signals from installation and performs two tasks in real time: leading the operator and monitoring of the installation (including signal validation). Systems tasks, architecture and knowledge representation concepts are described. The system is based on expert systems techniques what makes in phases of continuous change of process parameters and it has been achieved by special knowledge representation allowing its dynamical modification. (author). 147 refs, 42 figs, 5 tab

  18. Endothelial RIG-I activation impairs endothelial function

    Energy Technology Data Exchange (ETDEWEB)

    Asdonk, Tobias, E-mail: tobias.asdonk@ukb.uni-bonn.de [Department of Medicine/Cardiology, University of Bonn, Sigmund-Freud-Str. 25, 53105 Bonn (Germany); Motz, Inga; Werner, Nikos [Department of Medicine/Cardiology, University of Bonn, Sigmund-Freud-Str. 25, 53105 Bonn (Germany); Coch, Christoph; Barchet, Winfried; Hartmann, Gunther [Institute for Clinical Chemistry and Clinical Pharmacology, University of Bonn, Sigmund-Freud-Str. 25, 53105 Bonn (Germany); Nickenig, Georg; Zimmer, Sebastian [Department of Medicine/Cardiology, University of Bonn, Sigmund-Freud-Str. 25, 53105 Bonn (Germany)

    2012-03-30

    Highlights: Black-Right-Pointing-Pointer RIG-I activation impairs endothelial function in vivo. Black-Right-Pointing-Pointer RIG-I activation alters HCAEC biology in vitro. Black-Right-Pointing-Pointer EPC function is affected by RIG-I stimulation in vitro. -- Abstract: Background: Endothelial dysfunction is a crucial part of the chronic inflammatory atherosclerotic process and is mediated by innate and acquired immune mechanisms. Recent studies suggest that pattern recognition receptors (PRR) specialized in immunorecognition of nucleic acids may play an important role in endothelial biology in a proatherogenic manner. Here, we analyzed the impact of endothelial retinoic acid inducible gene I (RIG-I) activation upon vascular endothelial biology. Methods and results: Wild type mice were injected intravenously with 32.5 {mu}g of the RIG-ligand 3pRNA (RNA with triphosphate at the 5 Prime end) or polyA control every other day for 7 days. In 3pRNA-treated mice, endothelium-depended vasodilation was significantly impaired, vascular oxidative stress significantly increased and circulating endothelial microparticle (EMP) numbers significantly elevated compared to controls. To gain further insight in RIG-I dependent endothelial biology, cultured human coronary endothelial cells (HCAEC) and endothelial progenitor cells (EPC) were stimulated in vitro with 3pRNA. Both cells types express RIG-I and react with receptor upregulation upon stimulation. Reactive oxygen species (ROS) formation is enhanced in both cell types, whereas apoptosis and proliferation is not significantly affected in HCAEC. Importantly, HCAEC release significant amounts of proinflammatory cytokines in response to RIG-I stimulation. Conclusion: This study shows that activation of the cytoplasmatic nucleic acid receptor RIG-I leads to endothelial dysfunction. RIG-I induced endothelial damage could therefore be an important pathway in atherogenesis.

  19. Endothelial RIG-I activation impairs endothelial function

    International Nuclear Information System (INIS)

    Asdonk, Tobias; Motz, Inga; Werner, Nikos; Coch, Christoph; Barchet, Winfried; Hartmann, Gunther; Nickenig, Georg; Zimmer, Sebastian

    2012-01-01

    Highlights: ► RIG-I activation impairs endothelial function in vivo. ► RIG-I activation alters HCAEC biology in vitro. ► EPC function is affected by RIG-I stimulation in vitro. -- Abstract: Background: Endothelial dysfunction is a crucial part of the chronic inflammatory atherosclerotic process and is mediated by innate and acquired immune mechanisms. Recent studies suggest that pattern recognition receptors (PRR) specialized in immunorecognition of nucleic acids may play an important role in endothelial biology in a proatherogenic manner. Here, we analyzed the impact of endothelial retinoic acid inducible gene I (RIG-I) activation upon vascular endothelial biology. Methods and results: Wild type mice were injected intravenously with 32.5 μg of the RIG-ligand 3pRNA (RNA with triphosphate at the 5′end) or polyA control every other day for 7 days. In 3pRNA-treated mice, endothelium-depended vasodilation was significantly impaired, vascular oxidative stress significantly increased and circulating endothelial microparticle (EMP) numbers significantly elevated compared to controls. To gain further insight in RIG-I dependent endothelial biology, cultured human coronary endothelial cells (HCAEC) and endothelial progenitor cells (EPC) were stimulated in vitro with 3pRNA. Both cells types express RIG-I and react with receptor upregulation upon stimulation. Reactive oxygen species (ROS) formation is enhanced in both cell types, whereas apoptosis and proliferation is not significantly affected in HCAEC. Importantly, HCAEC release significant amounts of proinflammatory cytokines in response to RIG-I stimulation. Conclusion: This study shows that activation of the cytoplasmatic nucleic acid receptor RIG-I leads to endothelial dysfunction. RIG-I induced endothelial damage could therefore be an important pathway in atherogenesis.

  20. Tractor accelerated test on test rig

    Directory of Open Access Journals (Sweden)

    M. Mattetti

    2013-09-01

    Full Text Available The experimental tests performed to validate a tractor prototype before its production, need a substantial financial and time commitment. The tests could be reduced using accelerated tests able to reproduce on the structural part of the tractor, the same damage produced on the tractor during real life in a reduced time. These tests were usually performed reproducing a particular harsh condition a defined number of times, as for example using a bumpy road on track to carry out the test in any weather condition. Using these procedures the loads applied on the tractor structure are different with respect to those obtained during the real use, with the risk to apply loads hard to find in reality. Recently it has been demonstrated how, using the methodologies designed for cars, it is possible to also expedite the structural tests for tractors. In particular, automotive proving grounds were recently successfully used with tractors to perform accelerated structural tests able to reproduce the real use of the machine with an acceleration factor higher than that obtained with the traditional methods. However, the acceleration factor obtained with a tractor on proving grounds is in any case reduced due to the reduced speed of the tractors with respect to cars. In this context, the goal of the paper is to show the development of a methodology to perform an accelerated structural test on a medium power tractor using a 4 post test rig. In particular, several proving ground testing conditions have been performed to measure the loads on the tractor. The loads obtained were then edited to remove the not damaging portion of signals, and finally the loads obtained were reproduced in a 4 post test rig. The methodology proposed could be a valid alternative to the use of a proving ground to reproduce accelerated structural tests on tractors.

  1. Choice of drilling equipment for surface mines of the Banovici and Djurdjevik coal basins

    Energy Technology Data Exchange (ETDEWEB)

    Kljucanin, T.; Cilovic, I.; Novak, I.; Tomic, R.

    1988-07-01

    Discusses factors influencing drilling equipment productivity at the Turija, Grivice and Potocari mines. When no reliable correlations were found in geomechanical analyses of overburden from different rigs, large-scale in field observations were made of overburden drilling. Four types of drilling equipment were in use in combination with 8 different shovel excavators (bucket capacity 5-20 m{sup 3}). Gives full details of the equipment considered and concludes by recommending the use of 110-115 mm diameter drilling equipment in combination with 8-9 m{sup 3} shovel excavators and also 150 mm diameter drilling equipment with larger capacity (18-20 m{sup 3}) excavators. 4 refs.

  2. A power recirculating test rig for ball screw endurance tests

    Directory of Open Access Journals (Sweden)

    Giberti Hermes

    2016-01-01

    Full Text Available A conceptual design of an innovative test rig for endurance tests of ball screws is presented in this paper. The test rig layout is based on the power recirculating principle and it also allows to overtake the main critical issues of the ball screw endurance tests. Among these there are the high power required to make the test, the lengthy duration of the same and the high loads between the screw and the frame that holds it. The article describes the test rig designed scheme, the kinematic expedients to be adopted in order to obtain the required performance and functionality and the sizing procedure to choose the actuation system.

  3. Quality in drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, E; Gervais, I [Sedco Forex Jacintoport Facility, Channelview, TX (United States); Le Moign, Y; Pangarkar, S; Stibbs, B [Sedco Forex, Montrouge (France); McMorran, P [Sedco Forex, Pau (France); Nordquist, E [Dubai Petroleum Company, Dubai (United Arab Emirates); Pittman, T [Sedco Forex, Perth (Australia); Schindler, H [Sedco Forex, Dubai (United Arab Emirates); Scott, P [Woodside Offshore Petroleum Pty. Ltd., Perth (Australia)

    1997-12-31

    Driven by cost and profitability pressures, quality has taken on new meaning and importance in the oil field during the past decade. In drilling operations, new initiatives have led to cooperative team efforts between operators and drilling contractors to enhance quality. In this article examples are given of how one drilling contractor, by adopting a quality culture, is reaping major benefits for its clients as well as its employees. 22 figs., 19 refs.

  4. Quality in drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, E.; Gervais, I. [Sedco Forex Jacintoport Facility, Channelview, TX (United States); Le Moign, Y.; Pangarkar, S.; Stibbs, B. [Sedco Forex, Montrouge (France); McMorran, P. [Sedco Forex, Pau (France); Nordquist, E. [Dubai Petroleum Company, Dubai (United Arab Emirates); Pittman, T. [Sedco Forex, Perth (Australia); Schindler, H. [Sedco Forex, Dubai (United Arab Emirates); Scott, P. [Woodside Offshore Petroleum Pty. Ltd., Perth (Australia)

    1996-12-31

    Driven by cost and profitability pressures, quality has taken on new meaning and importance in the oil field during the past decade. In drilling operations, new initiatives have led to cooperative team efforts between operators and drilling contractors to enhance quality. In this article examples are given of how one drilling contractor, by adopting a quality culture, is reaping major benefits for its clients as well as its employees. 22 figs., 19 refs.

  5. Advanced Seismic While Drilling System

    Energy Technology Data Exchange (ETDEWEB)

    Robert Radtke; John Fontenot; David Glowka; Robert Stokes; Jeffery Sutherland; Ron Evans; Jim Musser

    2008-06-30

    . An APS Turbine Alternator powered the SeismicPULSER{trademark} to produce two Hz frequency peak signals repeated every 20 seconds. Since the ION Geophysical, Inc. (ION) seismic survey surface recording system was designed to detect a minimum downhole signal of three Hz, successful performance was confirmed with a 5.3 Hz recording with the pumps running. The two Hz signal generated by the sparker was modulated with the 3.3 Hz signal produced by the mud pumps to create an intense 5.3 Hz peak frequency signal. The low frequency sparker source is ultimately capable of generating selectable peak frequencies of 1 to 40 Hz with high-frequency spectra content to 10 kHz. The lower frequencies and, perhaps, low-frequency sweeps, are needed to achieve sufficient range and resolution for realtime imaging in deep (15,000 ft+), high-temperature (150 C) wells for (a) geosteering, (b) accurate seismic hole depth, (c) accurate pore pressure determinations ahead of the bit, (d) near wellbore diagnostics with a downhole receiver and wired drill pipe, and (e) reservoir model verification. Furthermore, the pressure of the sparker bubble will disintegrate rock resulting in an increased overall rates of penetration. Other applications for the SeismicPULSER{trademark} technology are to deploy a low-frequency source for greater range on a wireline for Reverse Vertical Seismic Profiling (RVSP) and Cross-Well Tomography. Commercialization of the technology is being undertaken by first contacting stakeholders to define the value proposition for rig site services utilizing SeismicPULSER{trademark} technologies. Stakeholders include national oil companies, independent oil companies, independents, service companies, and commercial investors. Service companies will introduce a new Drill Bit SWD service for deep HTHP wells. Collaboration will be encouraged between stakeholders in the form of joint industry projects to develop prototype tools and initial field trials. No barriers have been identified

  6. Technical specification for IR rig manufacture

    Energy Technology Data Exchange (ETDEWEB)

    Han Hyon Soo; Cho, W. K.; Kim, S. D.; Park, U. J.; Hong, S. B.; Yoo, K. M

    2000-10-01

    IR Rig is one of the equipments are required in HANARO core for a radioisotope target. The various conditions like high radiation, high heat, rapid flow and vibration may cause swelling, Brittleness and acceleration of corrosion in HANARO core. These specific problems can be prevented and the safety of such equipment are prerequisite as well as durableness and surveillance. Therefore, the selection of material has to be made on the basis of small cross-section area, low energy emission by the gamma ray due to the absorption of neutron and short half life. The body is consist of aluminum and Inconel-750 was used for the internal spring(coil) which is known to be durable. The whole production process including the purchase of accessory, mechanical processing, welding and assembly was carried out according to the standard procedure to meet the requirement. A design, manufacture, utilization of reactor core and the other relevant uses were fit to class ''T'' to certify the whole process as general. And design, fabrication, analytical test, materials and accessory were carried out based on the ASME, ASTM, ANSI, AWS, JIS and KS standard.

  7. ROLLER RIG TESTING AT THE CZECH TECHNICAL UNIVERSITY

    Directory of Open Access Journals (Sweden)

    J. Kalivoda

    2016-08-01

    Full Text Available Purpose. Although the advancements in computer simulation technology have paved way to provide very reliable simulation results, track tests still play an essential role during the process of development and homologation of any railway vehicle. On the other hand, track tests depend on weather conditions, are difficult to organize and are not suitable for testing vehicles in critical situations. On a roller rig, the tested vehicle is longitudinally fixed and a track is replaced by rotating rollers. Such device offer testing of railway vehicle running dynamics in safe and stable laboratory environment. The purpose of an article is to investigate and describe roller rig testing at the Czech technical university in Prague (CTU. Methodology. In the paper it is shown the history of development of the scaled CTU roller rig from the earlier stages until the current projects for which the CTU roller rig is utilized for. The current design of the experimental bogie, roller rig, sensors instrumentation and types of experiments conducted at the CTU roller rig are described in more detail. Findings. Although the differences in vehicle behaviour on a track and a scaled model on a roller rig are not negligible, scaled roller rig experiments are found as a relatively inexpensive way for verification and demonstration of computer simulations results. They are especially useful for verification of multibody system simulations (MBS of entirely new running gear concepts. Originality. The CTU roller rig is currently used for the experiments with active controlled wheelset guidance. According to simulations results published in many papers such systems offer, in principle, better performance compared to conventional passive vehicles. However, utilization and testing of active controlled wheelset guidance on vehicles is still rare. CTU roller rig serves as a tool to verify computer simulations and demonstrate benefits of active wheelset guidance. Practical value

  8. Chemical monitoring of mud products on drilled cuttings

    International Nuclear Information System (INIS)

    Hughes, T.L.; Jones, T.G.J.; Tomkins, P.G.; Gilmour, A.; Houwen, O.H.; Sanders, M.

    1991-01-01

    An increasing area of concern for offshore drilling practices in the environmental impact of discharged drilled cuttings contaminated with drilling fluids. The standard retort analysis is of limited accuracy and chemical specificity. Anticipating future requirements for a more complete accounting of mud chemicals discharged to the environment, we present here results for chemical monitoring using a modern comprehensive chemical analysis technique. Fourier transform infrared (FT-IR) spectrometry. In this paper description is given of sampling methods found to be practical and the main calibration requirements are discussed. The techniques developed in the course of this work give a good mineralogical breakdown of mud solids (commercial and drilled solids) in addition to the environmentally relevant measurements relating to mud on cuttings. The possibility of using the new technique for the rigsite monitoring of drilling cuttings is demonstrated. Cuttings samples simultaneously from the flow line, shaker screen, desilter and mud cleaner were analyzed. It is found that mud polymers and other organic additives can be measured with sufficient accuracy to measure the removal of mud products by discharged cuttings. The technique is also applicable to quantify the losses of oil-based mud on cuttings. Field testing has shown that the instrumentation used in sufficiently robust and simple to use for rig-site application

  9. TITAN - a 9 MW, 179 bar pressurised water rig

    International Nuclear Information System (INIS)

    Mogford, D.J.; Lee, D.H.

    1987-02-01

    The report describes the TITAN rig built at Winfrith for thermal hydraulic experiments with water at up to 179 bar pressure. A power supply of 9 MW is available. The report describes three typical experiments that show the versatility of the rig. The first is a 25 rod pressurized water reactor fuel bundle critical heat flux experiment, the second is a parallel channel evaporator test and the third is a model jet pump test. (author)

  10. Statistikeren skiftede spor som 49-årig

    DEFF Research Database (Denmark)

    Sølund, Sune; Rootzén, Helle

    2010-01-01

    En uddannelse til coach har ændret Helle Rototzens liv. Som 49-årig forlod hun et forskerliv på deltid til fordel for en karriere som DTU's eneste kvindelige institutdirektør.......En uddannelse til coach har ændret Helle Rototzens liv. Som 49-årig forlod hun et forskerliv på deltid til fordel for en karriere som DTU's eneste kvindelige institutdirektør....

  11. Drilling bits for deep drilling and process for their manufacture

    Energy Technology Data Exchange (ETDEWEB)

    Rhode, H.; Juergens, R.; Feenstra, R.; Busking, B.E.

    1978-11-30

    The invention concerns a drilling head or a drilling bit for use in deep drilling in underground formations and particularly concerns a drilling bit with a drilling bit body, which has a shank and a hollow space, which is connected with a duct extending through the shank. The drilling bit body has several separate cutting elements for removing material from the floor of a borehole and hydraulic devices for cooling and/or cleaning the cutting elements are provided.

  12. Slight rise possible in U.S. drilling; Canadian action sags

    International Nuclear Information System (INIS)

    Petzet, G.A.; Beck, R.J.

    1996-01-01

    The low level of US drilling evident in 1995 is likely to continue into 1996. Anticipated increases in the average prices of crude oil and natural gas will sustain only about a 2% increase in the number of wells drilled year to year in the US. A second year of decline can be expected in Canada from 1993's historic high, but total drilling will remain above the average of well counts for the past 10 years. Here are the main points of OGJ's early year drilling forecast for 1996: (1) Operators will drill 21,800 wells, compared with the 21,300 OGJ estimates they drilled in 1995. (2) The active rotary rig count will average 750, up 14% from 1995. (3) Operators will drill 3,300 exploratory wells of all types, up from 3,119 last year. (4) A surveyed group of major operators will drill 2,551 wells during the year, down from the 2,920 wells the same group operated in 1995. The 1996 figures includes 245 exploratory wells of all types, up from 219 last year. Meanwhile, drilling in western Canada will total 9,375 wells, down 12% from 1995 but still a healthy number historically. This paper provides exploration statistics for both the US and Canada and is broken down by state and province. It gives data on both exploratory and development wells. Data is also broken down by specific field

  13. Second half work to boost 1991 drilling in the U.S

    International Nuclear Information System (INIS)

    Petzet, G.A.

    1991-01-01

    This paper reports that U.S. well completions in 1991 will increase about 8% compared with 1990 if operators stick with present spending plans during the second half. Operators are expected to realize $76.4 billion in wellhead revenues this year, 10.7% less than the 1990 estimate. However, they are expected to invest a larger share of those revenues in drilling this year than they did in 1990. With less than half the year remaining, here is Oil and Gas Journal's updated look at 1991 U.S. drilling: The rotary rig count will average 1,050, up from last year's average of 1,010. Operators will drill about 31,654 oil wells, gas wells, and dry holes compared with an estimated 29,170 drilled in 1990. Exploratory drilling will decline to 5,711 wildcats. Total footage drilled will exceed 152 million ft of hole; average well depth is expected to be about 4,805 ft. Major oil companies drilled 2,602 wells in the U.S. during first half 1991 and plan to drill 2,569 the rest of this year. Meanwhile, drilling in western Canada will likely total 5,900 wells this year

  14. Core drilling of drillhole ONK-PVA11 in ONKALO at Olkiluoto 2014

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Drillcon SMOY, Espoo (Finland)

    2014-12-15

    Suomen Malmi Oy (Smoy) core drilled a drillhole for groundwater monitoring station in ONKALO at Eurajoki, Olkiluoto in 2014. The groundwater monitoring stations are used for monitoring changes in groundwater conditions. The drillhole ONK-PVA11 was drilled in February 2014. The length of the drillhole is 30.05 metres. The drillhole is 75.7 mm by diameter. The drillhole ONK-PVA11 was drilled in the left wall of the ONK-TT-4399 (tunnel chainage 50) between the demonstration tunnel ONK-TDT-4399-44 and 56 openings. The hydraulic DE 130 drilling rig was used. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The drillhole was measured with EMS deviation survey tool. In addition to drilling the drillcore was logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillcore are veined gneiss, diatexitic gneiss and pegmatitic granite. The average fracture frequency in drill core is 2.3 pcs/m and the average RQD value 95.2 %. (orig.)

  15. Off the launch-pad: Tesco lays out plans to fully commercialize casing drilling

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.

    2002-09-01

    A strategic plan to advance the company's patented casing drilling technology was recently unveiled by Calgary-based Tesco Corporation. The plans include construction of a $30 million Calgary manufacturing facility, construction and conversion of dozens of rigs for casing drilling capability and a training centre for engineers and operating personnel in Houston, Texas. Tesco Corporation expects to capture about five per cent of the market and generate one billion dollars in revenue within five years. The advantage of casing drilling is that it allows oil companies to drill wells without the need to constantly insert and withdraw drill strings in a process known as tripping, which is not only time consuming, but it opens up the well to such common downhole problems as sloughing, lost circulation and loss of well control. The technology can be used in virtually any drilling environment. Tesco has drilled straight, deviated and horizontal wells, reached depths of 12,000 feet and is pushing the limits well by well. Casing drilling has been shown to reduce the number of unscheduled events and reduce borehole instability that can cause delay or result in the loss of the well. It has also proven to be 30 per cent faster than conventional drilling. 3 figs.

  16. Core drilling of drillhole ONK-PVA11 in ONKALO at Olkiluoto 2014

    International Nuclear Information System (INIS)

    Toropainen, V.

    2014-12-01

    Suomen Malmi Oy (Smoy) core drilled a drillhole for groundwater monitoring station in ONKALO at Eurajoki, Olkiluoto in 2014. The groundwater monitoring stations are used for monitoring changes in groundwater conditions. The drillhole ONK-PVA11 was drilled in February 2014. The length of the drillhole is 30.05 metres. The drillhole is 75.7 mm by diameter. The drillhole ONK-PVA11 was drilled in the left wall of the ONK-TT-4399 (tunnel chainage 50) between the demonstration tunnel ONK-TDT-4399-44 and 56 openings. The hydraulic DE 130 drilling rig was used. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The drillhole was measured with EMS deviation survey tool. In addition to drilling the drillcore was logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillcore are veined gneiss, diatexitic gneiss and pegmatitic granite. The average fracture frequency in drill core is 2.3 pcs/m and the average RQD value 95.2 %. (orig.)

  17. Core drilling of deep drillhole OL-KR54 at Olkiluoto in Eurajoki 2010

    International Nuclear Information System (INIS)

    Toropainen, V.

    2010-11-01

    As a part of the confirming site investigations at Olkiluoto, Suomen Malmi Oy (Smoy) core drilled a 500.18 m deep drillhole with a diameter of 75.7 mm at Olkiluoto in July - August 2010. The identification number of the drillhole is OL-KR54. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the returning and drilling water were recorded. The drill rig was computer controlled and the computer recorded drilling parameters during drilling. The objective of the measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volume of the used drilling, washing and flushing water was 382 m 3 . The measured volume of the returning water in the drillhole was 334 m 3 . The deviation of the drillhole was measured with the deviation measuring instruments EMS and Gyro. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength was 111.5 MPa, the average Young's Modulus was 43.7 GPa and the average Poisson's ratio was 0.17. The main rock types are diatexitic and veined gneisses, pegmatitic granite and mafic gneiss. The average fracture frequency is 1.6 pcs/m and the average RQD value is 97.6 %. Nine fractured zones were penetrated by the drillhole. (orig.)

  18. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  19. Drilling technologies in hydrogeological survey

    OpenAIRE

    Vorlíček, Petr

    2014-01-01

    This work deals with the drilling technologies used in hydrogeology. The main aim of the work is to explore types of drilling technologies used at hydrogeological drilling wells and modern technologies that could potentially be used in the future. The work also summarizes a historical development of drilling techniques, a drilling process procedure, information obtained from boreholes and the most common types of drilling fluids.

  20. Drilling cost analysis

    International Nuclear Information System (INIS)

    Anand, A.B.

    1992-01-01

    Drilling assumes greater importance in present day uranium exploration which emphasizes to explore more areas on the basis of conceptual model than merely on surface anomalies. But drilling is as costly as it is important and consumes a major share (50% to 60%) of the exploration budget. As such the cost of drilling has great bearing on the exploration strategy as well as on the overall cost of the project. Therefore, understanding the cost analysis is very much important when planning or intensifying an exploration programme. This not only helps in controlling the current operations but also in planning the budgetary provisions for future operations. Also, if the work is entrusted to a private party, knowledge of in-house cost analysis helps in fixing the rates of drilling in different formations and areas to be drilled. Under this topic, various factors that contribute to the cost of drilling per meter as well as ways to minimize the drilling cost for better economic evaluation of mineral deposits are discussed. (author)

  1. Drilling for scientific purpose

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, Shoichi

    1987-09-01

    Drilling for scientific purpose is a process of conducting geophysical exploration at deep underground and drilling for collecting crust samples directly. This is because earth science has advanced to get a good understanding about the top of the crust and has shifted its main interest to the lower layer of the crust in land regions. The on-land drilling plan in Japan has just started, and the planned drilling spots are areas around the Minami River, Hidaka Mts., kinds of the Mesozoic and Cenozoic granite in outside zone, the extension of Japan Sea, Ogasawara Is., Minami-Tori Is., and active volcanos. The paper also outlines the present situation of on-land drilling in the world, focusing on the SG-3rd super-deep well SG-3 on the Kola Peninsula, USSR, Satori SG-1st well SG-1 in Azerbaidzhan S.S.R, V.S.S.R, Sweden's wells, Cyprus' wells, Bayearn well Plan in West Germany, and Salton Sea Scientific Drilling Program in the U.S. At its end, the paper explains the present situation and the future theme of the Japanese drilling technique and points out the necessity of developing equipment, and techniques. (14 figs, 5 tabs, 26 refs)

  2. Case study : environmental considerations of horizontal directional drills

    International Nuclear Information System (INIS)

    Slade, D.A.

    2000-01-01

    A pipeline construction project by Enbridge Pipelines (Toledo) Inc. which relied on horizontal directional drilling (HDD) techniques to install the pipe was analyzed with particular focus on the environmental benefits and risks of using directional drills compared to open cut installation. The construction of the 35-mile, 16-inch crude petroleum pipeline from Stockbridge to Freedom Junction in Michigan involved the use of 11 separate directional drills to cross through wetlands, streams and state recreational areas. The role that HDD played in route selection and environmental permit considerations was discussed along with some of the problems encountered with directional drilling. A successful HDD program must have adequate geotechnical information to properly design and plan the crossings. It was recommended that geotechnical borings should be conducted every 300 to 500 feet across the HDD alignment. It was also recommended that a frac-out contingency plan should be developed and to be prepared for the temporary shut down of the HDD rig if a frac-out occurs. Frac-outs must be investigated, contained and any released fluid should be removed. Some recommendations from past experiences were also presented as a guide for future planning of pipeline projects that include HDD techniques, particularly in wetland areas. Appendix A to this presentation included a contingency plan for illustrative purposes only. The plan was developed for the above project and was included as an example only. It described the planning, prevention and control measures to minimize impacts resulting from inadvertent spill of drilling mud during directional drilling in wetlands. It also included a drilling mud 'Containment, Response and Notification Plan' to be implemented as determined by the contractor under the supervision of Enbridge Pipelines (Toledo) Inc. 5 refs., 2 tabs., 1 fig., 1 appendix

  3. Theory and application of a measurement-while-drilling neutron porosity sensor

    International Nuclear Information System (INIS)

    Roesler, R.F.; Barnett, W.C.; Paske, W.C.

    1987-01-01

    The authors describe the first MWD compensated neutron porosity measurement service (CNO) which employs a dual-spaced, borehole-compensated detector system to measure neutron-capture gamma rays. CNO service, when combined with existing MWD gamma ray and resistivity services, provides the basic data necessary for calculation of water saturation from MWD logs, making it possible to replace wireline logs in many situations with resulting savings in both logging costs and associated rig time. This is particularly cost effective when drilling high angle offshore development wells and in other high cost development drilling

  4. Drilling and well technology

    Energy Technology Data Exchange (ETDEWEB)

    Milheim, K. [Mining University Leoben Institute for Drilling Technology, (Austria)

    1996-12-31

    Over a billion dollars a year is lost by exploration and production companies drilling wells because of the lack of learn curve management (LMC) practices. This paper presents the importance of the LMC concept, what it is, why LMC has not yet been recognized as a major initiative for improving drilling cost performance. The paper discusses the different types of planning, problems with implementation of plans, the use and misuse of drilling results and data bases, and the lack of post analysis practices. The major point of the paper is to show the massive savings that can be achieved by valuing LMC, learning LMC and successfully implementing LMC. . 2 refs., 5 figs.

  5. Understanding how the placement of an asymmetric vibration damping tool within drilling while underreaming can influence performance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Kabbara, Alan; McCarthy, John; Burnett, Timm; Forster, Ian [National Oilwell Varco Downhole Ltd. (NOV), Houston, TX (United States)

    2012-07-01

    This paper describes the work, on test rigs and full-scale drilling rigs, carried out with respect to placement of an Asymmetric Vibration Damping Tool (AVDT) within drilling while under reaming operations. An AVDT, by virtue of the forward synchronous motion imposed on the drill string, offers benefits in minimizing down hole vibration-related tool failures and therefore maximizing rate of penetration (ROP). Of interest in using the AVDT is the tendency to minimize stick slip by means of the parasitic torque it generates. This is of particular importance during under reaming operations. While under reaming, stick slip can result in low (ROP) and potentially an increased incidence of down hole tool failures. The use of an AVDT in these operations has been shown to significantly reduce stick slip. However, due to the forward synchronous motion caused by the AVDT, there is the potential to cause eccentric wear to the Bottom Hole Assembly (BHA) components in the vicinity of the AVDT. If allowed to progress, this eccentric wear can cause a reduction in down hole tool life and drilling performance. Eliminating eccentric wear would be beneficial in reducing repair costs, extending component life and further improving drilling performance. To minimize eccentric wear and maximize drilling performance, the placement of the AVDT within the BHA is critical. This paper describes how the placement of intermediate stabilizers between the AVDT and the under reamer can minimize eccentric wear to the under reamer and the adjacent drill string due to the forward synchronous whirl induced by the AVDT. This approach allows the full benefits of the AVDT to be recognized while reducing the potentially damaging effects of eccentric wear to other BHA components. The work has drawn upon small-scale rig testing, full-scale testing at the Ullrigg test facility in Norway and from real-world drilling and under reaming operations in the USA. (author)

  6. Core drilling of drillhole ONK-PVA8 in ONKALO at Olkiluoto 2010

    International Nuclear Information System (INIS)

    Toropainen, V.

    2010-12-01

    Suomen Malmi Oy (Smoy) core drilled a drillhole for groundwater monitoring station in ONKALO at Eurajoki, Olkiluoto in July 2010. The groundwater monitoring stations are used for monitoring changes in groundwater conditions. The identification number of the hole is ONK-PVA8, and the length of the drillhole is 17.74 m. The drillhole is 75.7 mm by diameter. The drillhole was drilled in a niche of the access tunnel at chainage 2935. The hydraulic DE 130 drilling rig was used. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillholes are diatexitic gneiss and pegmatitic granite. The average fracture frequency in drill core ONK-PVA8 is 1.7 pcs / m and the average RQD value 96.0 %. (orig.)

  7. The final frontier: Tesco takes evolution of casing drilling system offshore

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.

    2000-04-01

    Tesco Corporation is complementing its smaller 4 1/2-inch casing-while-drilling (CWD) tools by designing a series of 13 3/8-inch and a 9 5/8-inch underreamers and cutters to accommodate the larger diameter holes typical of offshore drilling. Tesco is building its own rig; it is a single rated to 3,000 metres that can be moved in seven loads with an overall 100 ton load rating. The unit features dimensional drilling capability in addition to features such as logging-while-drilling, and measurement-while-drilling. A conventional coring unit is employed via wireline. To date, Tesco has successfully overcome two of the main challenges in developing the new drilling process, i. e. to guarantee that casing can be run in high compression loads without damage to connections, and to develop an underreamer cutting structure to destroy rock at a rate comparable to conventional rotary drilling. The wireline retrieval system, which is 100 per cent reliable in running mode, but only 70 per cent successful in the retrieval mode, is the next challenge to be overcome. Tesco claims a 40 per cent reduction in overall 'spud to release' time, however, the main advantage claimed for the system is that the casing system protects the integrity of the hole as it is being drilled.

  8. Humvee Armor Plate Drilling

    National Research Council Canada - National Science Library

    2004-01-01

    When drilling holes in hard steel plate used in up-armor kits for Humvee light trucks, the Anniston Army Depot, Anniston, Alabama, requested the assistance of the National Center for Defense Manufacturing and Machining (NCDMM...

  9. Viral Pseudo Enzymes Activate RIG-I via Deamidation to Evade Cytokine Production

    Science.gov (United States)

    He, Shanping; Zhao, Jun; Song, Shanshan; He, Xiaojing; Minassian, Arlet; Zhou, Yu; Zhang, Junjie; Brulois, Kevin; Wang, Yuqi; Cabo, Jackson; Zandi, Ebrahim; Liang, Chengyu; Jung, Jae U; Zhang, Xuewu; Feng, Pinghui

    2015-01-01

    SUMMARY RIG-I is a pattern recognition receptor that senses viral RNA and is crucial for host innate immune defense. Here we describe a mechanism of RIG-I activation through amidotransferase-mediated deamidation. We show that viral homologues of phosphoribosylformyglycinamide synthase (PFAS), although lacking intrinsic enzyme activity, recruit cellular PFAS to deamidate and activate RIG-I. Accordingly, depletion and biochemical inhibition of PFAS impair RIG-I deamidation and concomitant activation. Purified PFAS and viral homologue thereof deamidate RIG-I in vitro. Ultimately, herpesvirus hijacks activated RIG-I to avoid antiviral cytokine production; loss of RIG-I or inhibition of RIG-I deamidation results in elevated cytokine production. Together, these findings demonstrate a surprising mechanism of RIG-I activation that is mediated by an enzyme. PMID:25752576

  10. Well drilling by rotary percussive drill above ground

    International Nuclear Information System (INIS)

    Sabatier, G.

    1987-01-01

    Originally, the Well Drilling Section of Cogema used only the diamond core drilling technique. The appearance of independent rotation for compressed air rock drills has led to the use and to the development of this drilling system, as a drill core is not indispensable, when the material of the search is radioactive. During the last few years, hydraulic drills have replaced the compressed air drills and have resulted in a very marked improvement: - of the penetration rates; - of the depth achieved. The Well Drilling Section of Cogema has to drill about 400 km per year with rock drills above ground and holds also the record for depth achieved with this technique, i.e. 400 m in granite. In France, the costs of these types of drilling are for the same depth of the order of one-quarter of the core drilling and half of the drilling with a down-the-hole drill. Cogema has greatly developed the types of well logging which now permits the extension of this type of drilling to the search for other materials than uranium [fr

  11. Horizontal drilling under Lake Erie

    Energy Technology Data Exchange (ETDEWEB)

    Meller, R.

    2001-07-01

    Drilling oil wells under Lake Erie calls for horizontal drilling wells to be drilled from shore out into the pay-zone under the lake. The nature and characteristics of horizontal wells as compared to vertical wells are explored. Considerations that have to be taken into account in drilling horizontal wells are explained (the degree of curvature, drilling fluid quality, geosteering in the pay-zone, steering instrumentation, measurements while drilling (MWD), logging while drilling (LWD)). The concept and reasons for extended reach wells are outlined, along with characteristic features of multilateral wells.

  12. Modeling pellet impact drilling process

    Science.gov (United States)

    Kovalyov, A. V.; Ryabchikov, S. Ya; Isaev, Ye D.; Ulyanova, O. S.

    2016-03-01

    The paper describes pellet impact drilling which could be used to increase the drilling speed and the rate of penetration when drilling hard rocks. Pellet impact drilling implies rock destruction by metal pellets with high kinetic energy in the immediate vicinity of the earth formation encountered. The pellets are circulated in the bottom hole by a high velocity fluid jet, which is the principle component of the ejector pellet impact drill bit. The experiments conducted has allowed modeling the process of pellet impact drilling, which creates the scientific and methodological basis for engineering design of drilling operations under different geo-technical conditions.

  13. HYDRATE CORE DRILLING TESTS

    Energy Technology Data Exchange (ETDEWEB)

    John H. Cohen; Thomas E. Williams; Ali G. Kadaster; Bill V. Liddell

    2002-11-01

    The ''Methane Hydrate Production from Alaskan Permafrost'' project is a three-year endeavor being conducted by Maurer Technology Inc. (MTI), Noble, and Anadarko Petroleum, in partnership with the U.S. DOE National Energy Technology Laboratory (NETL). The project's goal is to build on previous and ongoing R&D in the area of onshore hydrate deposition. The project team plans to design and implement a program to safely and economically drill, core and produce gas from arctic hydrates. The current work scope includes drilling and coring one well on Anadarko leases in FY 2003 during the winter drilling season. A specially built on-site core analysis laboratory will be used to determine some of the physical characteristics of the hydrates and surrounding rock. Prior to going to the field, the project team designed and conducted a controlled series of coring tests for simulating coring of hydrate formations. A variety of equipment and procedures were tested and modified to develop a practical solution for this special application. This Topical Report summarizes these coring tests. A special facility was designed and installed at MTI's Drilling Research Center (DRC) in Houston and used to conduct coring tests. Equipment and procedures were tested by cutting cores from frozen mixtures of sand and water supported by casing and designed to simulate hydrate formations. Tests were conducted with chilled drilling fluids. Tests showed that frozen core can be washed out and reduced in size by the action of the drilling fluid. Washing of the core by the drilling fluid caused a reduction in core diameter, making core recovery very difficult (if not impossible). One successful solution was to drill the last 6 inches of core dry (without fluid circulation). These tests demonstrated that it will be difficult to capture core when drilling in permafrost or hydrates without implementing certain safeguards. Among the coring tests was a simulated hydrate

  14. BURNER RIG TESTING OF A500 C/SiC

    Science.gov (United States)

    2018-03-17

    AFRL-RX-WP-TR-2018-0071 BURNER RIG TESTING OF A500® C /SiC Larry P. Zawada Universal Technology Corporation Jennifer Pierce UDRI...TITLE AND SUBTITLE BURNER RIG TESTING OF A500® C /SiC 5a. CONTRACT NUMBER In-House 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 62102F 6...test program characterized the durability behavior of A500® C /SiC ceramic matrix composite material at room and elevated temperature. Specimens were

  15. Core drilling of drillholes OL-PP66-69 at Olkiluoto 2008

    International Nuclear Information System (INIS)

    Kuusirati, J.; Tarvainen, A.-M.

    2009-04-01

    Suomen Malmi Oy (Smoy) core drilled four 24.88 - 25.39 m long investigation drillholes at Olkiluoto in June 2008. The identification numbers of the holes are OL-PP66, OL-PP67, OL-PP68 and OL-PP69. The drillholes are 75.7 mm by diameter. Drillholes were core drilled with the diamond drill rig Diamec 1000. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The labelled drilling water was driven to the drilling places in a tank. In addition to drilling the drill cores were logged and reported by geologist. During geological investigation the following parameters were logged: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillholes are diatexitic and veined gneisses and pegmatitic granite. The average fracture frequency in holes varied from 3.9 pcs/m to 5.8 pcs/m. The average RQD values varied from 84 % to 93 %. In the drillhole OL-PP66 two fractured zones were penetrated and in OL-PP69 one fractured zone. The drill cores OL-PP67 and OL-PP68 showed no fractured zones. Smoy also carried out optical imaging of the drillholes. The assignment included the field work and the data processing. This report describes the field operation, the equipment as well as the processing procedures and shows the obtained results and their quality. The raw and processed data are delivered digitally in WellCAD and PDF format. (orig.)

  16. Evacuation drill at CMS

    CERN Multimedia

    Niels Dupont-Sagorin and Christoph Schaefer

    2012-01-01

    Training personnel, including evacuation guides and shifters, checking procedures, improving collaboration with the CERN Fire Brigade: the first real-life evacuation drill at CMS took place on Friday 3 February from 12p.m. to 3p.m. in the two caverns located at Point 5 of the LHC.   CERN personnel during the evacuation drill at CMS. Evacuation drills are required by law and have to be organized periodically in all areas of CERN, both above and below ground. The last drill at CMS, which took place in June 2007, revealed some desiderata, most notably the need for a public address system. With this equipment in place, it is now possible to broadcast audio messages from the CMS control room to the underground areas.   The CMS Technical Coordination Team and the GLIMOS have focused particularly on preparing collaborators for emergency situations by providing training and organizing regular safety drills with the HSE Unit and the CERN Fire Brigade. This Friday, the practical traini...

  17. Mars Drilling Status

    Science.gov (United States)

    Mandell, Humboldt, C., Jr.

    2002-01-01

    This slide presentation reviews the current status of work to explore Mars beneath the surface of planet. One of the objective of this work is to enable further exploration of Mars by humans. One of the requirements for this is to find water on Mars. The presences of water is critical for Human Exploration and a permanent presence on Mars. If water is present beneath the surface it is the best chance of finding life on Mars. The presentation includes a timeline showing the robotic missions, those that have already been on Mars, and planned missions, an explanation of why do we want to drill on Mars, and some of the challenges, Also include are reviews of a missions that would drill 200 and 4,000 to 6,000 meters into the Martian bedrock, and a overview description of the drill. There is a view of some places where we have hopes of finding water.

  18. Test Rig for Valves of Digital Displacement Machines

    DEFF Research Database (Denmark)

    Nørgård, Christian; Christensen, Jeppe Haals; Bech, Michael Møller

    2017-01-01

    A test rig for the valves of digital displacement machines has been developed at Aalborg University. It is composed of a commercial radial piston machine, which has been modified to facilitate Digital Displacement operation for a single piston. Prototype valves have been optimized, designed and m...

  19. Collisions damage assessment of ships and jack-up rigs

    DEFF Research Database (Denmark)

    Zhang, Shengming; Pedersen, P. Terndrup; Ocakli, Hasan

    2015-01-01

    Ship collision with offshore installations is one of the key concerns in design and assess of platforms performance and safety. This paper presents an analysis on collision energy and structural damage in ship and offshore platform collisions for various collision scenarios. The platform or rig...

  20. Ultrasonically assisted drilling of rocks

    Science.gov (United States)

    Mikhailova, N. V.; Onawumi, P. Y.; Roy, A.; Silberschmidt, V. V.

    2018-05-01

    Conventional drilling of rocks can generate significant damage in the drilled material; a material layer is often split off a back surface of a sample during drilling, negatively affecting its strength. To improve finish quality, ultrasonically assisted drilling (UAD) was employed in two rocks - sandstone and marble. Damage areas in both materials were reduced in UAD when compared to conventional drilling. Reductions in a thrust force and a torque reduction were observed only for UAD in marble; ultrasonic assistance in sandstone drilling did not result in improvements in this regard.

  1. Rotary core drills

    Energy Technology Data Exchange (ETDEWEB)

    1967-11-30

    The design of a rotary core drill is described. Primary consideration is given to the following component parts of the drill: the inner and outer tube, the core bit, an adapter, and the core lifter. The adapter has the form of a downward-converging sleeve and is mounted to the lower end of the inner tube. The lifter, extending from the adapter, is split along each side so that it can be held open to permit movement of a core. It is possible to grip a core by allowing the lifter to assume a closed position.

  2. Drilling comparison in "warm ice" and drill design comparison

    DEFF Research Database (Denmark)

    Augustin, L.; Motoyama, H.; Wilhelms, F.

    2007-01-01

    For the deep ice-core drilling community, the 2005/06 Antarctic season was an exciting and fruitful one. In three different Antarctic locations, Dome Fuji, EPICA DML and Vostok, deep drillings approached bedrock (the ice-water interface in the case of Vostok), emulating what had previously been...... achieved at NorthGRIP, Greenland, (summer 2003 and 2004) and at EPICA Dome C2, Antarctica (season 2004/05). For the first time in ice-core drilling history, three different types of drill (KEMS, JARE and EPICA) simultaneously reached the depth of 'warm ice' under high pressure. After excellent progress...... at each site, the drilling rate dropped and the drilling teams had to deal with refrozen ice on cutters and drill heads. Drills have different limits and perform differently. In this comparative study, we examine depth, pressure, temperature, pump flow and cutting speed. Finally, we compare a few...

  3. Core drilling of drillholes ONK-PVA9 and ONK-PVA10 in ONKALO at Olkiluoto 2011

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Suomen Malmi Oy, Espoo (Finland)

    2011-10-15

    Suomen Malmi Oy (Smoy) core drilled two drillholes for groundwater monitoring stations in ONKALO at Eurajoki, Olkiluoto in 2011. The groundwater monitoring stations are used for monitoring changes in groundwater conditions. The drillhole ONK-PVA9 was drilled in March 2011 and the drillhole ONK-PVA10 in June 2011. The lengths of the drillholes are 15.95 and 20.10 m respectively. The drillholes are 75.7 mm by diameter. The drillhole ONK-PVA9 was drilled in a niche of the access tunnel at chainage 4366 and the ONK-PVA10 in the access tunnel wall at chainage 3851. The hydraulic DE 130 drilling rig was used. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The drillholes were measured with EMS deviation survey tool. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillholes are veined gneiss and pegmatitic granite. The average fracture frequencies in drill cores are 2.9 pcs/m (ONK-PVA9) and 2.3 pcs/m (ONK-PVA10) and the average RQD values 81.6 % and 96.2 % respectively. (orig.)

  4. Core drilling of hydco drillholes ONK-PP262 and ONK-PP274 in ONKALO at Olkiluoto 2010

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Suomen Malmi Oy, Espoo (Finland)

    2011-10-15

    Suomen Malmi Oy (Smoy) core drilled two drillholes for HYDCO-program in ONKALO at Eurajoki, Olkiluoto in 2010. The drillhole ONK-PP262 was drilled in May 2010 and the drillhole ONK-PP274 in December 2010. The lengths of the drillholes are 25.02 and 23.88 m respectively. The drillholes are 75.7 mm by diameter. The drillholes were drilled in the investigation niche 4 at the access tunnel chainage 3747. The hydraulic DE 130 drilling rig was used. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The drillholes were measured with EMS deviation survey tool. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillholes are veined gneiss and pegmatitic granite. The average fracture frequencies in both drill cores are 1.4 pcs/m. The average RQD values in the drillcores are 97.2 % (ONK-PP262) and 98.6 % (ONK-PP274). (orig.)

  5. Core drilling of hydco drillholes ONK-PP262 and ONK-PP274 in ONKALO at Olkiluoto 2010

    International Nuclear Information System (INIS)

    Toropainen, V.

    2011-10-01

    Suomen Malmi Oy (Smoy) core drilled two drillholes for HYDCO-program in ONKALO at Eurajoki, Olkiluoto in 2010. The drillhole ONK-PP262 was drilled in May 2010 and the drillhole ONK-PP274 in December 2010. The lengths of the drillholes are 25.02 and 23.88 m respectively. The drillholes are 75.7 mm by diameter. The drillholes were drilled in the investigation niche 4 at the access tunnel chainage 3747. The hydraulic DE 130 drilling rig was used. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The drillholes were measured with EMS deviation survey tool. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillholes are veined gneiss and pegmatitic granite. The average fracture frequencies in both drill cores are 1.4 pcs/m. The average RQD values in the drillcores are 97.2 % (ONK-PP262) and 98.6 % (ONK-PP274). (orig.)

  6. DMPD: MDA5/RIG-I and virus recognition. [Dynamic Macrophage Pathway CSML Database

    Lifescience Database Archive (English)

    Full Text Available 18272355 MDA5/RIG-I and virus recognition. Takeuchi O, Akira S. Curr Opin Immunol. ...2008 Feb;20(1):17-22. Epub 2008 Feb 12. (.png) (.svg) (.html) (.csml) Show MDA5/RIG-I and virus recognition.... PubmedID 18272355 Title MDA5/RIG-I and virus recognition. Authors Takeuchi O, Akira S. Publication Curr Opi

  7. Evaluation of using cyclocranes to support drilling & production of oil & gas in wetland areas. Sixth quarterly technical progress report, incorporating milestone schedule/status, October 1993--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Eggington, W.J.

    1994-04-01

    This report is a progress report on a planned program falling under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. During this period, task 5, subscale tests, and task 7, environmental impacts, were completed. Work was continued on task 10, technology transfer, and the preparation of the final report as part of task 11.

  8. Drill Sergeant Candidate Transformation

    Science.gov (United States)

    2009-02-01

    leadership styles of NCOs entering Drill Sergeant School (DSS). ARI also developed and administered a prototype DS Assessment Battery to assess...preferred leadership styles . DSS training increases both the degree to which the DSC feels obligated to and identifies with the Army. DSS training...4 TABLE 3. PREFERRED LEADERSHIP STYLES DEFINITIONS .............................................6 TABLE 4. DSC CHANGE IN

  9. Measurement Space Drill Support

    Science.gov (United States)

    2015-08-30

    II) H-47 Block II (I) *H-47 Block II (II) AVN FVL Att (I) * AVN FVL Att (II) TRAC- MTRY F2025B Logistic Flow MS Drill Support FY15 Research...does not have to use other AVN /ground assets to cover the area, freeing these assets to perform other missions and potentially enhancing the

  10. Study of environmental concerns: offshore oil and gas drilling and production

    Energy Technology Data Exchange (ETDEWEB)

    Baker, R

    1978-01-01

    Material on the environmental concerns associated with offshore drilling and production activities has been synthesized with Department of Fisheries and Environment files on specific projects, these being the primary information source. Recommendations to resolve these concerns have also been provided. Most of the environmental concerns identified in this study are traceable to specific weaknesses in offshore drilling and production procedures and management systems. Hardware weaknesses are seldom of central importance. Areas of concern include the gradual deposition of pollutants from rigs, underwater pipelines and onshore ancillary structures, and the quality of the following: action plans to deal with oil spills, standards for safety and anti-pollution equipment, information provided on the environmental hazards in offshore drilling and production areas, environmental impact assessments, and communication links between those having environmental concerns and expertise (including the public-at-large) and those who make the decisions regarding offshore oil and gas development.

  11. U.S. drilling: Solid reasons for optimism

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    One year ago, it was apparent that 1996 would be a better year for drilling in the US, primarily because 1995 performance was lower than expected due to low oil and natural gas prices in mid-year during the peak drilling season. Improving energy prices last year did spur more drilling, and a 2.9% increase to a total 23,560 wells is estimated for 1996. This year should show an even stronger increase, as the US gas market remains attractive and industry's perception is that crude prices are stabilizing at higher levels, i.e., $20--25, instead of $15--20. The US rotary rig count followed the price up, from a low near 700 in January/February to slightly over 850 in December. To drill the expected wells this year will require an average number at the 850 level. Operators are investing more in their established oil producing areas to take advantage of improved cast flows. This will generate higher activity nearly everywhere. Gas drilling activity will be more geographical, depending on transport availability to surging winter markets and Canadian competition. The US, and world, hot spot is the Gulf of Mexico led by renewed activity on the shelf and an exciting new deepwater play. The expected activity surge has already taxed a service industry that has not yet upgraded its capacity from the long downturn. And spot shortages will temper the activity rise, particularly offshore. The following discussion and six statistical presentations detail these basic concepts and other key factors

  12. The laboratory test rig with miniature jet engine to research aviation fuels combustion process

    Directory of Open Access Journals (Sweden)

    Gawron Bartosz

    2015-12-01

    Full Text Available This article presents laboratory test rig with a miniature turbojet engine (MiniJETRig – Miniature Jet Engine Test Rig, that was built in the Air Force Institute of Technology. The test rig has been developed for research and development works aimed at modelling and investigating processes and phenomena occurring in full scale jet engines. In the article construction of a test rig is described, with a brief discussion on the functionality of each of its main components. Additionally examples of measurement results obtained during the realization of the initial tests have been included, presenting the capabilities of the test rig.

  13. Maximizing productivity of horizontal drilling and completion techniques

    Energy Technology Data Exchange (ETDEWEB)

    Schein, G. [BJ Services Company, Calgary, AB (Canada)

    2007-07-01

    There are currently 160 active drilling rigs in the Barnett shale play, and small early developments have now become large-scale operations. This presentation outlined methods currently used to improve the productivity of directional drilling and completion techniques in gas shale plays. Horizontal completions are used to control height growth and increase contact areas. A typical horizontal well casing program was described along with details of cement liner treatment programs. Charts of optimum and non-optimum azimuth wells were included. Increased reservoir contact has been achieved by using limited-entry designs and acid stages with ball-sealers and abrasive jet-cutters. Pump rates have been increased during various stages, and larger fluid and sand volumes were used. A mineralogy comparison was provided, as well as details of the general design criteria for vertical wells in the region. It was concluded that drilling in the Barnett shale play has been successful as a result of using 3-dimensional seismic mapping as well as by initiating multiple, simultaneous fracs. The presentation also included charts of the Arkoma-Woodford play, the Arkoma-Fayetteville play, and the Delaware Basin. tabs., figs.

  14. Key technologies of drilling process with raise boring method

    Directory of Open Access Journals (Sweden)

    Zhiqiang Liu

    2015-08-01

    Full Text Available This study presents the concept of shaft constructed by raise boring in underground mines, and the idea of inverse construction can be extended to other fields of underground engineering. The conventional raise boring methods, such as the wood support method, the hanging cage method, the creeping cage method, and the deep-hole blasting method, are analyzed and compared. In addition, the raise boring machines are classified into different types and the characteristics of each type are described. The components of a raise boring machine including the drill rig, the drill string and the auxiliary system are also presented. Based on the analysis of the raise boring method, the rock mechanics problems during the raise boring process are put forward, including rock fragmentation, removal of cuttings, shaft wall stability, and borehole deviation control. Finally, the development trends of raise boring technology are described as follows: (i improvement of rock-breaking modes to raise drilling efficiency, (ii development of an intelligent control technique, and (iii development of technology and equipment for nonlinear raise boring.

  15. Drilling subsurface wellbores with cutting structures

    Science.gov (United States)

    Mansure, Arthur James; Guimerans, Rosalvina Ramona

    2010-11-30

    A system for forming a wellbore includes a drill tubular. A drill bit is coupled to the drill tubular. One or more cutting structures are coupled to the drill tubular above the drill bit. The cutting structures remove at least a portion of formation that extends into the wellbore formed by the drill bit.

  16. Electronic temperature control and measurements reactor fuel rig circuits

    Energy Technology Data Exchange (ETDEWEB)

    Glowacki, S W

    1980-01-01

    The electronic circuits of two digital temperature meters developed for the thermocouple of Ni-NiCr type are described. The output thermocouple signal as converted by means of voltage-to-freguency converter. The frequency is measured by a digital scaler controled by quartz generator signals. One of the described meter is coupled with digital temperature controler which drives the power stage of the reactor rig heater. The internal rig temperature is measured by the thermocouple providing the input signal to the mentioned voltage-to-frequency converter, that means the circuits work in the negative feedback loop. The converter frequency-to-voltage ratio is automatically adjusted to match to thermocouple sensitivity changes in the course of the temperature variations. The accuracy of measuring system is of order of +- 1degC for thermocouple temperature changes from 523 K up to 973 K (50degC up to 700degC).

  17. The electronic temperature control and measurements reactor fuel rig circuits

    International Nuclear Information System (INIS)

    Glowacki, S.W.

    1980-01-01

    The electronic circuits of two digital temperature meters developed for the thermocouple of Ni-NiCr type are described. The output thermocouple signal as converted by means of voltage-to-freguency converter. The frequency is measured by a digital scaler controled by quartz generator signals. One of the described meter is coupled with digital temperature controler which drives the power stage of the reactor rig heater. The internal rig temperature is measured by the thermocouple providing the input signal to the mentioned voltage-to-frequency converter, that means the circuits work in the negative feedback loop. The converter frequency-to-voltage ratio is automatically adjusted to match to thermocouple sensitivity changes in the course of the temperature variations. The accuracy of measuring system is of order of +- 1degC for thermocouple temperature changes from 523 K up to 973 K (50degC up to 700degC). (author)

  18. TECHNICAL FEATURES OF RIGGED YACHT BY CATEGORIES AND CLASSES

    Directory of Open Access Journals (Sweden)

    Svitlana Yeroshkina

    2016-06-01

    Full Text Available The article is directed on the deeply meaningful scientific study and structural analysis of the technical features of the rigged world modern yachts to pass sailing regattas in different navigation areas. The complete classification of sailing boats in it’s world classes was done for olympic, international, national regattas. It was done the technical indicators of yachting racing classes. The economic analysis material selection sails for yachts are directed of different types of races. In it’s scientific article is made economic calculation of operating cost of the boat and it was done the analysis of cost saving yachts in european / ukrainian marinas.Key words: yachting, rigged yacht, racing, classes of yachts. JEL: L 92

  19. Test Rig Design and Presentation for a Hydraulic Yaw System

    DEFF Research Database (Denmark)

    Stubkier, Søren; Pedersen, Henrik C.; Andersen, Torben Ole

    2013-01-01

    The design and development of a hydraulic yaw system for multi MWturbines is presented and the concept explained. As part of the development of the new concept a full scale test rig for a 5 MW wind turbine has been designed and constructed. The test rig is presented along with its unique design...... features. The design process is outlined to give insight in the design criteria driving the design. Loads and yaw demands are based on the IEC 61400-1 standard for wind turbine design, and the loads for this examination are extrapolated from the FAST aero elastic design software. The concepts are based...... on a 5 MW offshore turbine. After the system presentation, measurement results are presented to verify the behavior of the system. The loads to the system are applied by torque controlled electrical servo drives, which can add a load of up to 3 MNm to the system. This gives an exact picture of the system...

  20. AHP 47: A RIG RGAD PO VISITS LHA SA

    Directory of Open Access Journals (Sweden)

    Pad ma skyid པདྨ་སྐྱིད།

    2017-04-01

    Full Text Available My name is Pad ma skyid. I was born in 1981 in Pan yag Community, 'Bo spa Township, Pad ma County, Mgo log Tibetan Autonomous Prefecture, Mtsho sngon (Qinghai Province. I have eight siblings. Growing up in a black yak-hair tent, we spent our days playing with lambs, foals, and calves. We told all sorts of stories when everyone was in bed - stories about King Ge sar, ghosts, marriages, and tricksters. It was a time for my whole family to relax and share. I heard many A rig rgad po stories from my parents, siblings, and guests. A rig rgad po became part of my childhood. These stories bring back many beautiful memories. ...

  1. High Temperature Piezoelectric Drill

    Science.gov (United States)

    Bao, Xiaoqi; Bar-Cohen, Yoseph; Sherrit, Stewart; Badescu, Mircea; Shrout, Tom

    2012-01-01

    Venus is one of the planets in the solar systems that are considered for potential future exploration missions. It has extreme environment where the average temperature is 460 deg C and its ambient pressure is about 90 atm. Since the existing actuation technology cannot maintain functionality under the harsh conditions of Venus, it is a challenge to perform sampling and other tasks that require the use of moving parts. Specifically, the currently available electromagnetic actuators are limited in their ability to produce sufficiently high stroke, torque, or force. In contrast, advances in developing electro-mechanical materials (such as piezoelectric and electrostrictive) have enabled potential actuation capabilities that can be used to support such missions. Taking advantage of these materials, we developed a piezoelectric actuated drill that operates at the temperature range up to 500 deg C and the mechanism is based on the Ultrasonic/Sonic Drill/Corer (USDC) configuration. The detailed results of our study are presented in this paper

  2. Offset drilling obligations

    International Nuclear Information System (INIS)

    Boyd, K.D.; Kalmakoff, J.J.

    1998-01-01

    A review of the 'offset well' clause found in freehold and Crown natural gas and petroleum leases was presented. The objective was to provide lessors and lessees with a clear understanding of the rights and obligations associated with offset wells. It was noted that offset well obligations vary according to the form of lease used, the type of offsetting well, the regulatory regime and the geophysical characteristics of the producing formation. Some suggestions were made as to how current versions of the offset well clause can be amended to overcome some of the problems encountered in applying the clause to an offset horizontal well that has been drilled on adjoining lands. Failure to resolve the new issues presented by horizontal drilling technology in terms of documentation, which records respective rights and obligations on the basis of generally accepted principles, will result in large numbers of conflicts and unnecessary litigation. 144 refs., 1 fig

  3. Diamonds are forever: drill bit advances may offer cheaper and stronger alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, J.

    2001-02-01

    The rise to prominence of polycrystalline diamond compact (PDC) and diamond-impregnated drill bits, slowly providing stiff competition to the roller-cone type bits that for many years was the standard in the drilling industry, is discussed. A roller-cone drill bit, although much improved by heat treatment of the metal and the addition of tungsten carbide, is still mostly steel. It works by crushing the rock by overcoming its compressive strength, whereas PDC drill bits shear the rock away in a manner similar to scraping ice from a car windshield. PDC bits typically have three to six cutting surfaces, each one edged with a row of polycrystalline diamond cutters, bonded to a tungsten carbide base by a process called microwave sintering. Compared to roller cones, PDCs drill at least twice as fast, especially in the soft rock and clay where they have been used principally. In addition to saving rig time, PDC bits can handle longer runs; in the right application it is possible to drill the total depth of a well with only one bit. The microwave-sintered tungsten carbide also has higher corrosion resistance than the same material bonded under high pressure; PDCs are also less subject to mechanical failure than roller cones which use moveable bearings, seals and rotating cones. 1 photo.

  4. Seize the data (Carpe data) : wave of computerized data capture technology sweeps drilling industry

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, J.

    1999-02-01

    The computerization of all aspects of the monitoring and collection of well drilling information is discussed. Global Link International Inc. of Calgary, has developed a computerized system for tracking and recording drilling data. This operations recording database is named the Electronic Tour Book (ETB). It is similar to the Electronic Tour Sheet (ETS) developed by Chimo Equipment Ltd. of Alberta. Both Windows-based systems represent computerized reporting mechanisms for operators, producers, loggers and rig-managers. Another Alberta company, Ryan Energy Technologies Inc., has begun marketing the Tru Vu Fusion system of hardware and software, yet another system for gathering and recording drilling data. Tru Vu Fusion can capture data and display it in a format that everybody at the wellsite can use for decision making. Another drilling data management system, entitled INSITE (for Integrated System for Information Technology and Engineering) is marketed by Sperry-Sun Drilling Services. While INSITE is intended primarily for offshore drilling applications, it can be used onshore with equal success. 4 figs.

  5. Testing of elastomer seals using small-size rigs

    International Nuclear Information System (INIS)

    Leeks, C.W.E.; Dunford, B.; Barnfield, J.H.; Gray, I.L.S.

    1997-01-01

    This paper looks at the use of small size seal leakage test rigs to demonstrate the compliance of full size container seals against the IAEA Transport Regulation's limits for activity release for normal transport and accident conditions. The detailed requirements of the regulations are discussed and it is concluded that an appropriate test programme to meet these requirements using only small size test rigs, can normally be set up and carried out on a relatively short time scale. It is important that any small test rigs should be designed to represent the relevant features of the seal arrangement and the overall test programme should cover all of the conditions, specified by the regulations, for the type, classification and contents of the container under consideration. The parameters of elastomer O-rings, which affect their sealing ability, are considered and those which are amenable to small scale testing or have to be modelled at full size are identified. Generally, the seals used in leakage tests have to be modelled with a full size cross-section but can have a reduced peripheral length. (Author)

  6. Flow Rate Measurement in Multiphase Flow Rig: Radiotracer and Conventional

    International Nuclear Information System (INIS)

    Nazrul Hizam Yusoff; Noraishah Othman; Nurliyana Abdullah; Amirul Syafiq Mohd Yunos; Rasif Mohd Zain; Roslan Yahya

    2015-01-01

    Applications of radiotracer technology are prevalent throughout oil refineries worldwide, and this industry is one of the main users and beneficiaries of the technology. Radioactive tracers have been used to a great extent in many applications i.e. flow rate measurement, RTD, plant integrity evaluation and enhancing oil production in oil fields. Chemical and petrochemical plants are generally continuously operating and technically complex where the radiotracer techniques are very competitive and largely applied for troubleshooting inspection and process analysis. Flow rate measurement is a typical application of radiotracers. For flow measurements, tracer data are important, rather than the RTD models. Research is going on in refining the existing methods for single phase flow measurement, and in developing new methods for multiphase flow without sampling. The tracer techniques for single phase flow measurements are recognized as ISO standards. This paper presents technical aspect of laboratory experiments, which have been carried out using Molybdenum-99 - Mo99 (radiotracer) to study and determine the flow rate of liquid in multiphase flow rig. The multiphase flow rig consists of 58.7 m long and 20 cm diameter pipeline that can accommodate about 0.296 m 3 of liquid. Tap water was used as liquid flow in pipeline and conventional flow meters were also installed at the flow rig. The flow rate results; radiotracer and conventional flow meter were compared. The total count method was applied for radiotracer technique and showed the comparable results with conventional flow meter. (author)

  7. Posiva microseismic network. Core drilling of drillholes ONK-PP348...351 in ONKALO at Olkiluoto 2012

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Suomen Malmi Oy, Espoo (Finland)

    2014-04-15

    Suomen Malmi Oy (Smoy) core drilled four drillholes for the Posiva's ONKALO microseismic network in ONKALO at Eurajoki, 2012. The drillholes are used for geophone instrumentation and geological characterization. The drillholes ONKPP348... 351 were core drilled in February 2012. All the drillholes are ∼ 9.40 m by length. The drillholes are 56.5 mm by diameter. The drillholes were drilled in deep angles to the floors of the access tunnel and three niches near each other at access tunnel chainages 3019 - 3080. The hydraulic DE 130 drilling rig was used. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The drillholes were measured with EMS deviation survey tool. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillcores are diatexitic gneiss and pegmatitic granite. The average fracture frequency of the drillcores range from 1.2 to 2.4 pc/m and the average RQD value from 96.6 % to 98.6 %. Two fractured zones were intersected. (orig.)

  8. Bentonite buffer pre-test. Core drilling of drillholes ONK-PP264...267 in ONKALO at Olkiluoto 2010

    International Nuclear Information System (INIS)

    Toropainen, V.

    2010-12-01

    Suomen Malmi Oy (Smoy) core drilled four drillholes for bentonite buffer pre-test in ONKALO at Eurajoki, Olkiluoto in July 2010. The identification numbers of the holes are ONK-PP264..267, and the lengths of the drillholes are approximately 4.30 metres each. The drillholes are 75.7 mm by diameter. The drillholes were drilled in a niche at access tunnel chainage 1475. The hydraulic DE 130 drilling rig was used for the work. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. In addition to drilling, the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock type in the drillholes is pegmatitic granite. The average fracture frequency in the drill cores is 4.0 pcs / m and the average RQD value 94.2 %. (orig.)

  9. Posiva microseismic network. Core drilling of drillholes ONK-PP348...351 in ONKALO at Olkiluoto 2012

    International Nuclear Information System (INIS)

    Toropainen, V.

    2014-04-01

    Suomen Malmi Oy (Smoy) core drilled four drillholes for the Posiva's ONKALO microseismic network in ONKALO at Eurajoki, 2012. The drillholes are used for geophone instrumentation and geological characterization. The drillholes ONKPP348... 351 were core drilled in February 2012. All the drillholes are ∼ 9.40 m by length. The drillholes are 56.5 mm by diameter. The drillholes were drilled in deep angles to the floors of the access tunnel and three niches near each other at access tunnel chainages 3019 - 3080. The hydraulic DE 130 drilling rig was used. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The drillholes were measured with EMS deviation survey tool. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillcores are diatexitic gneiss and pegmatitic granite. The average fracture frequency of the drillcores range from 1.2 to 2.4 pc/m and the average RQD value from 96.6 % to 98.6 %. Two fractured zones were intersected. (orig.)

  10. Pushing the limits : from better bits to faster coil, companies leverage technology to ramp up onshore drilling performance

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.

    2009-06-15

    Horizontal drilling and drilling with coiled tubing are two well drilling techniques that have steadily gained ground in the drilling industry. Most of the techniques evolved in western Canada and Alaska, but are now being successfully used south of the border. This article discussed the leveraging of technology by drilling companies in order to ramp up onshore drilling performance. Calgary-based Xtreme Coil Drilling Corp. leveraged its unique coil over top drive rigs in order to score more speed records and set new marks in both the United States Rockies and Mexico. This article also referred to other companies and their wells that have set records, including CNX Gas Corporation and the Marcellus Shale prospect; Smith International and its horizontal turbodrilling of a Pennsylvanian reservoir; and Baker Oil Tools' new rotating, self-aligning multilateral (RAM) system. For each of these examples, the article described the technology and the challenges encountered by the companies as well as the objectives of the project, and results of the drilling efforts. 2 figs.

  11. Core drilling of deep drillhole OL-KR57 at Olkiluoto in Eurajoki 2011-2012

    International Nuclear Information System (INIS)

    Toropainen, V.

    2012-07-01

    As a part of the confirming site investigations at Olkiluoto, Suomen Malmi Oy (Smoy) core drilled 401.71 m and 45.01 m deep drillholes, OL-KR57 and OL-KR57B, at Olkiluoto in September 2011 - January 2012. The diameter of the drillholes is 75.7 mm. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the returning and drilling water were recorded. The drill rig was computer controlled and the computer recorded drilling parameters during drilling. The objective of the measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling, flushing and washing water were 350 m3 and 30 m3 in the drillholes OL-KR57 and OL-KR57B, respectively. The measured volumes of the returning water in the drillholes were 328 m 3 and 16.8 m 3 , respectively. The deviations of the drillholes were measured with the deviation measuring instruments EMS and Gyro. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength was 123.9 MPa, the average Young's Modulus was 42.6 GPa and the average Poisson's ratio was 0.23. The main rock types are veined and diatexitic gneisses, mica gneiss and tonaliticgranodioritic- granitic gneiss. The average fracture frequency is 2.5 pcs/m in drillhole OL-KR57 and 3.3 pcs/m in the drillhole OL-KR57B. The average RQD values are 95.0 % and 93.0 %. Seven separate fractured zones were interpreted from OL-KR57 and three fractured zones from OL-KR57B. (orig.)

  12. Core drilling of REPRO drillholes in ONKALO at Olkiluoto 2010-2011

    International Nuclear Information System (INIS)

    Toropainen, V.

    2012-05-01

    Suomen Malmi Oy (Smoy) core drilled ten drillholes for the Posiva's Experiments to investigate Rock Matrix Retention Properties (REPRO) in ONKALO at Eurajoki, 2010 - 2011. The drillholes are used for geological characterization, hydrological and geophysical studies and instrumenting in research for retention of radionuclides to rock matrix. The drillhole ONK-PP240 was drilled in March 2010 and the drillholes ONKPP318... 324 and ONK-PP326...327 in October - December 2011. The lengths of the drillholes range from 4.90 to 21.65 metres. The drillholes are 56.5 mm by diameter. The drillhole ONK-PP240 was drilled for pretesting in the investigation niche 4 at access tunnel chainage 3747 and the rest of the drillholes in the investigation niche 5 at access tunnel chainage 4219. The hydraulic DE 130 drilling rig was used. The starting directions of the close spaced drillholes were controlled with an aligner assembly to be as parallel as possible. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The drillholes were measured with EMS deviation survey tool. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillholes are veined gneiss, pegmatitic granite and quartz gneiss (skarn rock). The average fracture frequency in drill cores is 1.2 pcs/m and the average RQD value 98.6 %. (orig.)

  13. Core drilling of deep drillhole OL-KR56 at Olkiluoto in Eurajoki 2011 - 2012

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Suomen Malmi Oy, Espoo (Finland)

    2012-07-15

    As a part of the confirming site investigations at Olkiluoto, Suomen Malmi Oy (Smoy) core drilled a 1201.65 m deep drillhole with a diameter of 75.7 mm at Olkiluoto in October 2011 - January 2012. The identification number of the drillhole is OL-KR56. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the returning and drilling water were recorded. The drill rig was computer controlled and the computer recorded drilling parameters during drilling. The objective of the measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volume of the used drilling, washing and flushing water was 1628 m{sup 3}. The measured volume of the returning water in the drillhole was 1142 m{sup 3}. The deviation of the drillhole was measured with the deviation measuring instruments Reflex EMS and Reflex Gyro. The main rock types are veined and diatexitic gneisses, pegmatitic granite and mica gneiss. The average fracture frequency is 2.4 pcs/m and the average RQD value is 96.2 %. Fifty fractured zones were penetrated by the drillhole. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength was 120.0 MPa, the average Young's Modulus was 38.3 GPa and the average Poisson's ratio was 0.22. (orig.)

  14. Core drilling of REPRO drillholes in ONKALO at Olkiluoto 2010-2011

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Suomen Malmi Oy, Espoo (Finland)

    2012-05-15

    Suomen Malmi Oy (Smoy) core drilled ten drillholes for the Posiva's Experiments to investigate Rock Matrix Retention Properties (REPRO) in ONKALO at Eurajoki, 2010 - 2011. The drillholes are used for geological characterization, hydrological and geophysical studies and instrumenting in research for retention of radionuclides to rock matrix. The drillhole ONK-PP240 was drilled in March 2010 and the drillholes ONKPP318... 324 and ONK-PP326...327 in October - December 2011. The lengths of the drillholes range from 4.90 to 21.65 metres. The drillholes are 56.5 mm by diameter. The drillhole ONK-PP240 was drilled for pretesting in the investigation niche 4 at access tunnel chainage 3747 and the rest of the drillholes in the investigation niche 5 at access tunnel chainage 4219. The hydraulic DE 130 drilling rig was used. The starting directions of the close spaced drillholes were controlled with an aligner assembly to be as parallel as possible. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The drillholes were measured with EMS deviation survey tool. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillholes are veined gneiss, pegmatitic granite and quartz gneiss (skarn rock). The average fracture frequency in drill cores is 1.2 pcs/m and the average RQD value 98.6 %. (orig.)

  15. Core drilling of deep drillhole OL-KR50 at Olkiluoto in Eurajoki 2008

    International Nuclear Information System (INIS)

    Toropainen, V.

    2009-02-01

    As a part of the confirming site investigations at Olkiluoto, Suomen Malmi Oy (Smoy) core drilled 939.33 m and 45.44 m deep drillholes with a diameter of 75.7 mm at Olkiluoto in September - November 2008. The identification numbers of the drillholes are OL-KR50 and OL-KR50B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the returning and drilling water were recorded. The drill rig was computer controlled and the computer recorded drilling parameters during drilling. The objective of the measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and washing water were 1135 m 3 and 20 m 3 in the drillholes OL-KR50 and OL-KR50B, respectively. The measured volume of the returning water in the drillhole OL-KR50 was 954 m 3 . The deviation of the drillholes was measured with the deviation measuring instruments EMS and Maxibor II. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength was 129.7 MPa, the average Young's Modulus was 45.8 GPa and the average Poisson's ratio was 0.15. The main rock types were veined and diatexitic gneisses, pegmatitic granite and tonaliticgranodioritic-granitic gneiss. The average fracture frequency is 2.0 pcs/m in drillhole OL KR50 and 3.6 pcs/m in the drillhole OL-KR50B. The average RQD values are 96.1 % and 94.3 %, respectively. 39 fractured zones were penetrated by drillhole OL-KR50 and four by drillhole OL-KR50B. (orig.)

  16. RIG-I self-oligomerization is either dispensable or very transient for signal transduction.

    Directory of Open Access Journals (Sweden)

    Jade Louber

    Full Text Available Effective host defence against viruses depends on the rapid triggering of innate immunity through the induction of a type I interferon (IFN response. To this end, microbe-associated molecular patterns are detected by dedicated receptors. Among them, the RIG-I-like receptors RIG-I and MDA5 activate IFN gene expression upon sensing viral RNA in the cytoplasm. While MDA5 forms long filaments in vitro upon activation, RIG-I is believed to oligomerize after RNA binding in order to transduce a signal. Here, we show that in vitro binding of synthetic RNA mimicking that of Mononegavirales (Ebola, rabies and measles viruses leader sequences to purified RIG-I does not induce RIG-I oligomerization. Furthermore, in cells devoid of endogenous functional RIG-I-like receptors, after activation of exogenous Flag-RIG-I by a 62-mer-5'ppp-dsRNA or by polyinosinic:polycytidylic acid, a dsRNA analogue, or by measles virus infection, anti-Flag immunoprecipitation and specific elution with Flag peptide indicated a monomeric form of RIG-I. Accordingly, when using the Gaussia Luciferase-Based Protein Complementation Assay (PCA, a more sensitive in cellula assay, no RIG-I oligomerization could be detected upon RNA stimulation. Altogether our data indicate that the need for self-oligomerization of RIG-I for signal transduction is either dispensable or very transient.

  17. Importance of drill string assembly swivel in horizontal drilling

    Directory of Open Access Journals (Sweden)

    Edmund Tasak

    2006-10-01

    Full Text Available A part of the drill string – the swivel (rotational connector – accomplishes an important task in the horizontal drilling. Its malfunctioning makes it impossible to draw in ( install large diameter and length pipelines. The causes of the connector break-down during the horizontal drilling are investigated in the paper. The drilling has been made for twenty inches gas pipeline installation during reaming operations. A trouble was encountered making good work conditions of a system consisting of the drilling machine drill string reamer swivel tube shield of Cardan joint and the gas pipeline 500 m long. In this case, the swivel brokes down and the planned operation was not finished. The assessment of improper drilling conditions, selection of operation system components, and drilling parameters and the insufficient technological supervising have created an excessive risk of failure. A proper application of technical analysis would considerably decrease the hazard of failure which cause large costs, delays and decrease of confidence to the drilling contractor and pipeline installation.

  18. Drill string gas data

    Energy Technology Data Exchange (ETDEWEB)

    Siciliano, E.R.

    1998-05-12

    Data and supporting documentation were compiled and analyzed for 26 cases of gas grab samples taken during waste-tank core sampling activities between September 1, 1995 and December 31, 1997. These cases were tested against specific criteria to reduce uncertainties associated with in-tank sampling location and conditions. Of the 26 possible cases, 16 qualified as drill-string grab samples most likely to represent recently released waste gases. The data from these 16 ``confirmed`` cases were adjusted to remove non-waste gas contributions from core-sampling activities (argon or nitrogen purge), the atmospheric background, and laboratory sampler preparation (helium). The procedure for subtracting atmospheric, laboratory, and argon purge gases was unambiguous. No reliable method for determining the exact amount of nitrogen purge gas was established. Thus, the final set of ``Adjusted`` drill string gas data for the 6 nitrogen-purged cases had a greater degree of uncertainty than the final results for the 10 argon-purged cases. Including the appropriate amounts of uncertainty, this final set of data was added to the set of high-quality results from the Retained Gas Sampler (RGS), and good agreement was found for the N{sub 2}, H{sub 2}, and N{sub 2}O mole fractions sampled from common tanks. These results indicate that under favorable sampling conditions, Drill-String (DS) grab samples can provide reasonably accurate information about the dominant species of released gas. One conclusion from this set of total gas data is that the distribution of the H{sub 2} mole fractions is bimodal in shape, with an upper bound of 78%.

  19. How we improved operations in drilling pre-salt wells

    Energy Technology Data Exchange (ETDEWEB)

    Hougaz, Augusto Borella [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Martins, Luiz Felipe; Bittencourt, Jessica Lima; Braz, Luciano Machado [Genesis do Brasil, Sao Paulo, SP (Brazil); Damski, Carlos [Genesis Petroleum Technology Pty Ltd. (GPT), Bentley, WA (Australia)

    2012-07-01

    The development of pre-salt wells offshore Brazil has been one of the most challenging projects in history of E and P. Facing water depths of 2000+ meters, a salt layer 2000 meters thick to reach reservoirs at 7000 meters below sea level, has to use technological and procedural techniques never used before. In those 2 years of exploration of those fields many technologies were tested and improved. This paper describes the systematic approach was taken to analyze, plan and follow-up the development of drilling operations campaign in those fields, and the case study of overall process improvement. The assumption was to apply a risk analysis tool which uses previous data to analyze the performance and plan future time. The goals of this process are continuous improvement of execution and process control for each operation. Looking into previous performance, new interventions were planned more accurately and further improvements were studied. The frequent follow up of the drilling intervention was done using the statistical base to compare the most recent results. At operational level it was possible to see if the last operation was done in the 1st, 2nd, 3rd or 4th quartile of its related statistical distribution, as well as to verify the difference within P10 and P90, which indicates the control of each operation execution process. The same process was done for some rig related operations and for the whole intervention at end of it. Close contact with the intervention progress was kept and actions taken in any major deviation from the plan. This paper describes the case study where the process control and optimization of the total time for drilling 10 wells with similar design was measured between March 2009 and May 2011. It resulted in significant improvement in the drilling process. (author)

  20. Drilling string lifter

    Energy Technology Data Exchange (ETDEWEB)

    Shakhobalov, A B; Galiopa, A A; Ponomarev, G V; Ushakov, A M

    1981-04-28

    A drilling string lifter is suggested which includes a rotating tower installed on a fixed base, hydraulic cylinder and pipe-clamping assembly connected through a chain gear to the drive motor. In order to simplify the design of the hydraulic lifter, the drive motor is installed on a fixed base so that the axis of the outlet shaft of the drive motor coincides with the axis of rotation of the tower. In addition, the axis of rotation of the tower is made in the form of a tubular element, and the outlet shaft of the drive motor is ranged between the tubular element.

  1. A study of natural circulation cooling using a flow visualization rig

    International Nuclear Information System (INIS)

    Bowman, W.C.; Ferch, R.L.; Omar, A.M.

    1985-01-01

    A flow visualization rig has been built at Monserco Limited to provide visual insight into the thermalhydraulic phenomena which occur during single phase and two phase thermosyphoning in a figure-of-eight heat transport loop. Tests performed with the rig have provided design information for the scaling and instrumentation of a high pressure rig being investigated for simulating CANDU reactor conditions during natural circulation cooling. A videotape was produced, for viewing at this presentation, to show important thermalhydraulic features of the thermosyphoning process. The rig is a standard figure-of-eight loop with two steam generators and three heated channels per pass. An elevated surge tank open to atmosphere was used for pressure control. Two variable speed pumps provided forced circulation for warming up the rig, and for establishing the desired initial conditions for testing. Test rig power could be varied between 0 and 15 kW

  2. Operating experience of a sodium rig following the ingress of oil

    Energy Technology Data Exchange (ETDEWEB)

    Bell, A C; Mehew, R D; Robertson, C M [UKAEA, Dounreay, Thurso, Caithness, Scotland (United Kingdom)

    1980-05-01

    The experience of operating the Small Water Leak Rig at Dounreay in the two years following the ingress into the sodium of silicone oil from the pump is reported. The carbon penetration into the rig pipework has been monitored and has been found to agree with a diffusion model. The predictions based on this model have enabled an operating strategy to be determined to allow continued operation of the rig. (author)

  3. Operating experience of a sodium rig following the ingress of oil

    International Nuclear Information System (INIS)

    Bell, A.C.; Mehew, R.D.; Robertson, C.M.

    1980-01-01

    The experience of operating the Small Water Leak Rig at Dounreay in the two years following the ingress into the sodium of silicone oil from the pump is reported. The carbon penetration into the rig pipework has been monitored and has been found to agree with a diffusion model. The predictions based on this model have enabled an operating strategy to be determined to allow continued operation of the rig. (author)

  4. Match Rigging and the Career Concerns of Referees

    DEFF Research Database (Denmark)

    Severgnini, Battista; Boeri, Tito

    2011-01-01

    This paper contributes to the literature on career concerns and corruption by drawing on extensive information on the performance of referees and records from Calciopoli, a judicial inquiry carried out in 2006 on corruption in the Italian football league. Unlike previous studies, we can analyse...... in detail the assignment of the referees to the most important matches, which is an important step in their career. Moreover, we can relate this choice to the performance of referees in previous matches and the evaluations they received in this context. We find that referees involved in match rigging were...

  5. 30 CFR 57.7052 - Drilling positions.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Drilling positions. 57.7052 Section 57.7052... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Drilling and Rotary Jet Piercing Drilling-Surface and Underground § 57.7052 Drilling positions. Persons shall not drill...

  6. 30 CFR 56.7052 - Drilling positions.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Drilling positions. 56.7052 Section 56.7052... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Drilling and Rotary Jet Piercing Drilling § 56.7052 Drilling positions. Persons shall not drill from— (a) Positions which hinder...

  7. Control procedure for well drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Bourdon, J C

    1988-09-09

    A control procedure of rotary drilling operations is proposed. It uses the Drill off test. The drill-off test permits to determine the rock drill speed variation as a function of the wright applied on the top of the pipe. We can deduce from that a rock drill wear parameter. The method permits to prevent a rupture and its grave economic consequences.

  8. 30 CFR 33.34 - Drilling test.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Drilling test. 33.34 Section 33.34 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.34 Drilling test. (a) A drilling test shall consist of drilling a set of 10 test holes, without...

  9. The development of fuel pins and material specimens mixed loading irradiation test rig in the experimental fast reactor Joyo. The development of the fuel-material hybrid rig

    International Nuclear Information System (INIS)

    Oyamatsu, Yasuko; Someya, Hiroyuki

    2013-02-01

    In the experimental fast reactor Joyo, there were many tests using the irradiation rigs that it was possible to be set irradiation conditions for each compartment independently. In case of no alternative fuel element to irradiate after unloading the irradiated compartments, the irradiation test was restarted with the dummy compartment which the fuel elements was not mounted. If the material specimens are mounted in this space, it is possible to use the irradiation space effectively. For these reasons, the irradiation rig (hybrid rig) is developed that is consolidated with material specimens compartment and fuel elements compartment. Fuel elements and material specimens differ greatly with heat generation, so that the most important issue in developing of hybrid rig is being able to distribute appropriately the coolant flow which satisfies irradiation conditions. The following is described by this report. (1) It was confirmed that the flow distribution of loading the same irradiation rig with the compartment from which a flow demand differs could be satisfied. (2) It was confirmed that temperature setting range of hybrid rig could be equivalent to that of irradiation condition. (3) By standardizing the coolant entrance structure of the compartment lower part, the prospect which can perform easily recombination of the compartment from which a type differs between irradiation rigs was acquired. (author)

  10. Activity plan: Directional drilling and environmental measurements while drilling

    International Nuclear Information System (INIS)

    Myers, D.A.

    1998-01-01

    This activity plan describes the testing of directional drilling combined with environmental measurements while drilling at two Hanford Site locations. A cold test is to be conducted at the 105A Mock Tank Leak Facility in the 200 East Area. A hot test is proposed to be run at the 216-B-8 tile field north of the 241-B Tank Farm in 200 East Area. Criteria to judge the success, partial success or failure of various aspects of the test are included. The TWRS program is assessing the potential for use of directional drilling because of an identified need to interrogate the vadose zone beneath the single-shell tanks. Because every precaution must be taken to assure that investigation activities do not violate the integrity of the tanks, control of the drill bit and ability to follow a predetermined drill path are of utmost importance and are being tested

  11. A new drilling method-Earthworm-like vibration drilling.

    Science.gov (United States)

    Wang, Peng; Ni, Hongjian; Wang, Ruihe

    2018-01-01

    The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed "earthworm-like drilling" is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a "soft-string" model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling.

  12. Activity plan: Directional drilling and environmental measurements while drilling

    Energy Technology Data Exchange (ETDEWEB)

    Myers, D.A.

    1998-07-16

    This activity plan describes the testing of directional drilling combined with environmental measurements while drilling at two Hanford Site locations. A cold test is to be conducted at the 105A Mock Tank Leak Facility in the 200 East Area. A hot test is proposed to be run at the 216-B-8 tile field north of the 241-B Tank Farm in 200 East Area. Criteria to judge the success, partial success or failure of various aspects of the test are included. The TWRS program is assessing the potential for use of directional drilling because of an identified need to interrogate the vadose zone beneath the single-shell tanks. Because every precaution must be taken to assure that investigation activities do not violate the integrity of the tanks, control of the drill bit and ability to follow a predetermined drill path are of utmost importance and are being tested.

  13. Environmental assessment report to BEPCo Canada Company on exploratory drilling on EL2407

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-19

    BEPCo. Canada Company (BEPCo) is planning to drill exploratory deepwater wells offshore from Nova Scotia. This environmental assessment report was prepared to satisfy regulatory requirements associated with offshore drilling. It focuses on valued environmental components chosen during a scoping process. This report evaluated the potential project-related effects on marine benthos, marine fish, marine mammals, marine turtles, marine birds, special areas, and other ocean users. Discharges and emissions from the project include drilling mud and rock cuttings, small amounts of produced water, ship discharges and atmospheric emissions. This report includes oceanographic plume modelling for allowable discharges of mud and cuttings at sea. The report predicts that the potential adverse effects of the valued environmental components will be short term and highly localized around the drilling rigs. It was suggested that any adverse effects could be mitigated through the use of technically feasible mitigation and standard offshore oil and gas industry procedures for environmental health and safety. It was concluded that BEPCo's proposed drilling program for EL-2407 can be conducted without any significant adverse effects on Nova Scotia's offshore environment. 121 refs., 27 tabs., 24 figs.

  14. Reinforcement and Drill by Microcomputer.

    Science.gov (United States)

    Balajthy, Ernest

    1984-01-01

    Points out why drill work has a role in the language arts classroom, explores the possibilities of using a microcomputer to give children drill work, and discusses the characteristics of a good software program, along with faults found in many software programs. (FL)

  15. High cost for drilling ships

    International Nuclear Information System (INIS)

    Hooghiemstra, J.

    2007-01-01

    Prices for the rent of a drilling ship are very high. Per day the rent is 1% of the price for building such a ship, and those prices have risen as well. Still, it is attractive for oil companies to rent a drilling ship [nl

  16. Development and operation of the Above Dome Inspection Rig (ADIR)

    International Nuclear Information System (INIS)

    Dickson, R.P.; Moorby, J.

    1984-01-01

    Hinkley Point 'B' is developing its remote inspection equipment in order to be able to inspect reactor internals adequately without manned vessel entry. The Above Dome Inspection Rig has been built to allow a number of inspection systems to be introduced and operated within the reactor. The ability to introduce, use and remove inspection equipment without the necessity to lift the rig from the reactor is a vital feature in the speed achieved in completing inspections quickly. Television was selected for the A.D.M. because it has significant advantages in terms of operational convenience. However the quality of image obtained in terms of information available compares unfavourably with photography. The sharpness of a photographic image is largely dictated by the chemical structure of the emulsion, whereas video is limited by the picture line structure and bandwidth. The need for a photographic system for in reactor use is therefore essential for high definition inspection requirements. The first inspection system that has been developed for the ADIR is the Telefilm camera. It consists of a Hasselblad photographic camera using an Insight television camera looking through its viewfinder. The characteristics of television and photography have been combined. (author)

  17. Ultrasonic rotary-hammer drill

    Science.gov (United States)

    Bar-Cohen, Yoseph (Inventor); Badescu, Mircea (Inventor); Sherrit, Stewart (Inventor); Bao, Xiaoqi (Inventor); Kassab, Steve (Inventor)

    2010-01-01

    A mechanism for drilling or coring by a combination of sonic hammering and rotation. The drill includes a hammering section with a set of preload weights mounted atop a hammering actuator and an axial passage through the hammering section. In addition, a rotary section includes a motor coupled to a drive shaft that traverses the axial passage through the hammering section. A drill bit is coupled to the drive shaft for drilling by a combination of sonic hammering and rotation. The drill bit includes a fluted shaft leading to a distal crown cutter with teeth. The bit penetrates sampled media by repeated hammering action. In addition, the bit is rotated. As it rotates the fluted bit carries powdered cuttings helically upward along the side of the bit to the surface.

  18. The Marskhod Egyptian Drill Project

    Science.gov (United States)

    Shaltout, M. A. M.

    We describe a possible participation of Egypt in a future Mars rover Mission. It was suggested that Egypt participate through involvement in the design, building and testing of a drill to obtain sub-surface samples. The Space Research Institute of the Russian Academy of Sciences (IKI), formally invited the Egyptian Ministry of Scientific Research to study the concept for potential use on the Russian Mars 2001 Mission. As one of the objectives of the Marskhod mission was the analysis of sub-surface samples, a drilling mechanism in the payload would be essential. The Egyptian expertise in drill development is associated with the archaeological exploration of the Pyramids. A sophisticated drilling system perforated limestone to a depth of 2 m without the use of lubricants or cooling fluids that might have contaminated the Pit's environment. This experience could have been applied to a drill development Mars 2001 mission, which was unfortunately canceled due to economic problems.

  19. Drilling waste makes concrete

    International Nuclear Information System (INIS)

    Rosfjord, A.

    1993-01-01

    The article deals with a method of drilling waste reclamation by utilizing the converted oil-containing cuttings from the North Sea in the concrete production in Norway. The oil content is to be removed in an incineration process by heating the cuttings to about 800 o C. The output capacity from the exhaust gas water cooling system is 7500 kW/hour, and is to be used in different industrial heating processes. The remaining content of pollutants in the cleaned exhaust gas outlet corresponds to the required limits with the exception of SO 2 and HCl. In addition, an exhaust gas washing plant is to be installed in the near future designed for the further reduction of pollutants by 90%. The converted raw materials are used as a supplement for lessening the demand of sand and cement in the production of concrete-made pipes. 1 fig

  20. Hospital preparation and drills

    International Nuclear Information System (INIS)

    Marshall, J.C.; Mettler, F.A. Jr.

    1990-01-01

    The authors discuss how effective management of radiation accidents requires a large amount of preparation and thought. In addition, training of the staff is absolutely essential. This is best accomplished through annual drills, but also may be accomplished through the use of videotapes. The critical points to be remembered in the handling of such accidents and in writing the procedures is that treatment of non-radiation-related injuries and medical stabilization are paramount. The second point is that it is important to be able to distinguish between a patient who has been irradiated from an external radiation source and one who is contaminated with radioactive materials. The handling of these two types of accidents is entirely different and this distinction needs to be made early. All of the items outlined in this chapter concern the care of the severely injured and radioactively contaminated

  1. Drillings at Veitsivaara in Hyrynsalmi

    International Nuclear Information System (INIS)

    Hinkkanen, H.; Oehberg, A.

    1990-04-01

    According to Governmen's decision in principle Teollisuuden Voima Oy is obliged to make bedrock investigations for the final disposal of the spent fuel produced by its power plant in Olkiluoto. Areas in Kuhmo, Hyrynsalmi, Sievi, Konginkangas and Olkiluoto were selected for the preliminary site investigations to be carried out during years 1987-1992. In Veitsivaara, Hyrynsalmi the investigation program was started in April 1987. During years 1987-1988 a deep borehole (1002 m) and 4 and 500 m deep additional boreholes were core drilled in the area. Various parameters were measured from the flushing water during the drilling. Corelogging included collecting detailed data of fractures and determining the weathering degree and petrographical properties. Rock mechanical properties, uniaxial compressive strength, Young's modulus and Poisso's ratio were measured from core samples. The flushing water needed in the drillings was pumped from 100 m deep borehole wells drilled with down-the-hole method in the vicinity of the borehole. The water was labeled with 2 tracers before use. About 75 m deep hole was percussion drilled near the borehole KR1. The spreading of the flushing water in the upper part of bedrock and the quality off the ground of the groundwater were studied by taking watersamples from the hole. 30 vertical holes were core drilled down to the depth of 10 m in bedrock with a light drilling unit. Drilling was carried out in order to determine the thickness of the overburden, to investigate the geophysical anomaly sources and to support geological mapping in areas covered with overburden. Groundwater hydraulics is one of the main subjects during the preliminary site investigation phase. For that reason 7 multilevel piezometers were installed on the site to monitore hydraulic head in 3 levels in the uppermost part of bedrock. The work consisted of borehole drillings to the depth of 100 m, geophysical borehole loggings and installation of piezometers. In addition

  2. Microgravity Drill and Anchor System

    Science.gov (United States)

    Parness, Aaron; Frost, Matthew A.; King, Jonathan P.

    2013-01-01

    This work is a method to drill into a rock surface regardless of the gravitational field or orientation. The required weight-on-bit (WOB) is supplied by a self-contained anchoring mechanism. The system includes a rotary percussive coring drill, forming a complete sampling instrument usable by robot or human. This method of in situ sample acquisition using micro - spine anchoring technology enables several NASA mission concepts not currently possible with existing technology, including sampling from consolidated rock on asteroids, providing a bolt network for astronauts visiting a near-Earth asteroid, and sampling from the ceilings or vertical walls of lava tubes and cliff faces on Mars. One of the most fundamental parameters of drilling is the WOB; essentially, the load applied to the bit that allows it to cut, creating a reaction force normal to the surface. In every drilling application, there is a minimum WOB that must be maintained for the system to function properly. In microgravity (asteroids and comets), even a small WOB could not be supported conventionally by the weight of the robot or astronaut. An anchoring mechanism would be needed to resist the reactions, or the robot or astronaut would push themselves off the surface and into space. The ability of the system to anchor itself to a surface creates potential applications that reach beyond use in low gravity. The use of these anchoring mechanisms as end effectors on climbing robots has the potential of vastly expanding the scope of what is considered accessible terrain. Further, because the drill is supported by its own anchor rather than by a robotic arm, the workspace is not constrained by the reach of such an arm. Yet, if the drill is on a robotic arm, it has the benefit of not reflecting the forces of drilling back to the arm s joints. Combining the drill with the anchoring feet will create a highly mobile, highly stable, and highly reliable system. The drilling system s anchor uses hundreds of

  3. Drilling miniature holes, Part III

    Energy Technology Data Exchange (ETDEWEB)

    Gillespie, L.K.

    1978-07-01

    Miniature components for precision electromechanical mechanisms such as switches, timers, and actuators typically require a number of small holes. Because of the precision required, the workpiece materials, and the geometry of the parts, most of these holes must be produced by conventional drilling techniques. The use of such techniques is tedious and often requires considerable trial and error to prevent drill breakage, minimize hole mislocation and variations in hole diameter. This study of eight commercial drill designs revealed that printed circuit board drills produced better locational and size repeatability than did other drills when centerdrilling was not used. Boring holes 1 mm in dia, or less, as a general rule did not improve hole location in brass or stainless steel. Hole locations of patterns of 0.66-mm holes can be maintained within 25.4-..mu..m diametral positional tolerance if setup misalignments can be eliminated. Size tolerances of +- 3.8 ..mu..m can be maintained under some conditions when drilling flat plates. While these levels of precision are possible with existing off-the-shelf drills, they may not be practical in many cases.

  4. Development and evaluation of a meter for measuring return line fluid flow rates during drilling

    Energy Technology Data Exchange (ETDEWEB)

    Loeppke, G.E.; Schafer, D.M.; Glowka, D.A.; Scott, D.D.; Wernig, M.D. (Sandia National Labs., Albuquerque, NM (United States)); Wright, E.K. (Ktech Corp., Albuquerque, NM (United States))

    1992-06-01

    The most costly problem routinely encountered in geothermal drilling is lost circulation, which occurs when drilling fluid is lost to the formation rather than circulating back to the surface. The successful and economical treatment of lost circulation requires the accurate measurement of drilling fluid flow rate both into and out of the well. This report documents the development of a meter for measuring drilling fluid outflow rates in the return line of a drilling rig. The meter employs a rolling counterbalanced float that rides on the surface of the fluid in the return line. The angle of the float pivot arm is sensed with a pendulum potentiometer, and the height of the float is calculated from this measurement. The float height is closely related to the fluid height and, therefore, the flow rate in the line. The prototype rolling float meter was extensively tested under laboratory conditions in the Wellbore Hydraulics Flow Facility; results from these tests were used in the design of the field prototype rolling float meter. The field prototype meter was tested under actual drilling conditions in August and September 1991 at the Long Valley Exploratory Well near Mammoth Lakes, Ca. In addition, the performance of several other commercially available inflow and outflow meters was evaluated in the field. The tested inflow meters included conventional pump stroke counters, rotary pump speed counters, magnetic flowmeters, and an ultrasonic Doppler flowmeter. On the return flow line, a standard paddlemeter, an acoustic level meter, and the prototype rolling float meter were evaluated for measuring drilling fluid outflow rates.

  5. Bycatch in 36 and 40 mm PA Turkish twin rigged beam trawl codends

    African Journals Online (AJOL)

    The Turkish twin rigged beam trawl which has two identical nets rigged side by side on the same beam targets mainly the Parapenaeus longirostris, although some bycatch fish species have also become target species. Thus, landings of the shrimp beam trawling fleet also include some commercially valuable fishes.

  6. Negative regulation of RIG-I-mediated antiviral signaling by TRK-fused gene (TFG) protein

    International Nuclear Information System (INIS)

    Lee, Na-Rae; Shin, Han-Bo; Kim, Hye-In; Choi, Myung-Soo; Inn, Kyung-Soo

    2013-01-01

    Highlights: •TRK-fused gene product (TFG) interacts with TRIM25 upon viral infection. •TFG negatively regulates RIG-I mediated antiviral signaling. •TFG depletion leads to enhanced viral replication. •TFG act downstream of MAVS. -- Abstract: RIG-I (retinoic acid inducible gene I)-mediated antiviral signaling serves as the first line of defense against viral infection. Upon detection of viral RNA, RIG-I undergoes TRIM25 (tripartite motif protein 25)-mediated K63-linked ubiquitination, leading to type I interferon (IFN) production. In this study, we demonstrate that TRK-fused gene (TFG) protein, previously identified as a TRIM25-interacting protein, binds TRIM25 upon virus infection and negatively regulates RIG-I-mediated type-I IFN signaling. RIG-I-mediated IFN production and nuclear factor (NF)-κB signaling pathways were upregulated by the suppression of TFG expression. Furthermore, vesicular stomatitis virus (VSV) replication was significantly inhibited by small inhibitory hairpin RNA (shRNA)-mediated knockdown of TFG, supporting the suppressive role of TFG in RIG-I-mediated antiviral signaling. Interestingly, suppression of TFG expression increased not only RIG-I-mediated signaling but also MAVS (mitochondrial antiviral signaling protein)-induced signaling, suggesting that TFG plays a pivotal role in negative regulation of RNA-sensing, RIG-I-like receptor (RLR) family signaling pathways

  7. Computer aided extractor design for the RIG 10 high intensity ion source

    International Nuclear Information System (INIS)

    Tanzer, F.; Haeuser, J.; Eppel, D.

    1980-01-01

    The paper discusses recent progress of the rf-ion source RIG 10, and describes a computer code for the simulation of the ion trajectories. The RIG 10 is designed for current densities of some 300 mA/cm 2 , and will be used for the production of neutral. (orig.)

  8. A reciprocating pin-on-plate test-rig for studying friction materials for holding brakes

    DEFF Research Database (Denmark)

    Poulios, Konstantinos; Drago, Nicola; Klit, Peder

    2014-01-01

    -on-plate test-rig for studying the evolution of wear by monitoring the pin height reduction using Eddy-current proximity sensors is presented. Moreover, a new mechanism for recording the friction force is suggested. Apart from the design of the test-rig, friction force and wear rate measurements for two...

  9. Drillings at Kivetty in Konginkangas

    International Nuclear Information System (INIS)

    Hinkkanen, H.; Oehberg, A.

    1990-05-01

    According to Government's decision in principle Teollisuuden Voima Oy is obliged to make bedrock investigations for the final disposal of the spent fuel produced by its power plant in Olkiluoto. Areas in Kuhmo, Hyrynsalmi, Sievi, Konginkangas and Olkiluoto were selected for the preliminary site investigations to be carried out during years 1987-1992. In Kivetty, Konginkangas the investigation program was started in spring 1988. During years 1988-1989 a deep borehole (1019 m) and 4 about 500 m deep additional boreholes were core drilled in the area. The structure of the holes makes it possible to carry out many investigations in the holes. Various parameters were measured from the flushing water during the drilling. Corelogging included collecting detailed data of fractures and determining the weathering degree and petrographical properties. Rock mechanical properties, uniaxial compressive strength, Young's modulus and Poisson's ratio were measured from core samples. The flushing water needed in the drillings was pumped from 100 m deep borehole wells drilled with down-the-hole method in the vicinity of the borehole. The water was labeled with 2 tracers before use. 30 vertical holes were core drilled down to the depth of 10 m in bedrock with a light drilling unit. Drilling was carried out in order to determine the thickness of the overburden to investigate the geophysical anomaly sources and to support geological mapping in areas covered with overburden. Groundwater hydraulics is one of the main subjects during the preliminary site investigation phase. For that reason 7 multilevel piezometers were installed on the site to monitore hydraulic head in 3 levels in the uppermost part of bedrock. The work consisted of borehole drillings to the depth of 100 m, geophysical borehole loggings and installation of piezometers. In addition about 65 shotholes were drilled for VSP-, tubewave and seismic measurements

  10. Drillings at Syyry in Sievi

    International Nuclear Information System (INIS)

    Hinkkanen, H.; Oehberg, A.

    1990-10-01

    According to Government's decision in principle Teollisuuden Voima Oy is obliged to make bedrock investigations for the final disposal of the spent fuel produced by its power plant in Olkiluoto. Areas in Kuhmo, Hyrynsalmi, Sievi, Konginkangas and Olkiluoto were selected for the preliminary site investigations to be carried out during years 1987-1992. In Syyry, Sievi the investigation program was started in spring 1988. During years 1988-1989 a deep borehole (1022 m) and 4 about 500-700 m deep additional boreholes were core drilled in the area. The structure of the holes makes it possible to carry out many investigations in the holes. Various parameters were measured from the flushing water during the drilling. Corelogging included collecting detailed data of fractures and determining the weathering degree and petrographical properties. Rock mechanical properties, uniaxial compressive strength, Young's modulus and Poisson's ratio were measured from core samples. The flushing water needed in the drillings was pumped from 100 m deep borehole wells drilled with down-the-hole method in the vicinity of the borehole. The water was labeled with 2 tracers before use. 35 vertical holes were core drilled down to the depth of 10-20 m in bedrock with a light drilling unit. Drilling was carried out in order to determine the thickness of the overburden, to investigate the geophysical anomaly sources and to support geological mapping in areas covered with overburden. Groundwater hydraulics is one of the main subjects during the preliminary site investigation phase. For that reason 7 multilevel piezometers were installed on the site to monitore hydraulic head in 3 levels in the uppermost part of bedrock. The work consisted of borehole drillings to the depth of 100 m, geophysical borehole loggings and installation of piezometers. In addition about 85 shotholes were drilled for VSP-, tubewave and seismic measurements

  11. A new drilling method—Earthworm-like vibration drilling

    Science.gov (United States)

    Wang, Peng; Wang, Ruihe

    2018-01-01

    The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed “earthworm-like drilling” is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a “soft-string” model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling. PMID:29641615

  12. Inverted emulsion drilling fluid

    Energy Technology Data Exchange (ETDEWEB)

    Ana, I; Astanei, E; Mireanu, G; Orosz, M; Popescu, F; Vasile, I

    1979-07-28

    The subject of the invention is the method of obtaining inverted drilling fluid which is required during stripping of a productive bed and ending of a well where difficulties develop during drilling of the argillaceous rock. Example: in a reservoir with capacity 30 m/sup 3/, 10 m/sup 3/ of diesel fuel are added. A total of 1000 kg of emulsifier are added to the diesel fuel consisting of: 85 mass% of a mixture of sodium and potassium salts of fatty acids, residues of fatty acids or naphthene acids with high molecular weight taken in proportion of 10:90; 5 mass% of a mixture of polymers with hydrophilic-hydrophobic properties obtained by mixing 75 mass% of polyethylene oxide with molecular weight 10,000 and 25 mass% of propylene oxide with molecular weight 15,000, and 10 mass% of salt on alkaline earth metal (preferably calcium chloride). The mixture is mixed into complete dissolving. Then 1200 kg of filtering accelerator are added obtained from concentrated sulfuric acid serving for sulfur oxidation, asphalt substance with softening temperature 85-104/sup 0/C and fatty acids C/sub 10/-C/sub 20/ taken in a proportion of 23.70 and 7 mass% The mixture obtained in this manner is neutralized by adding calcium hydroxide and equal quantities of alumina and activated bentonite clay in a concentration of 1-10 mass%, more preferably 5 mass% in relation to the initial mixture. The obtained mass is mixed until complete dispersion, after which 200 kg of organophilic clay are added obtained from bentonite of the type montmorillonite of sodium by processing with derivate obtained from amine of the type of the quaternary base of ammonium salt, and agent of hydrophobization of the type of fatty alcohols, fatty acids, nonion surfactants of the block-polymer type. After complete dispersion of the organophilic clay, 100 kg of stabilizer of emulsion of the surfactant type was added with molecular weight of 250010,000, more preferably 5000, in concentration of 0.1-5.0 mass%, more

  13. Numerical simulation of the RF ion source RIG-10

    International Nuclear Information System (INIS)

    Arzt, T.

    1988-01-01

    A two-dimensional model for the numerical simulation of the inductively coupled radio-frequency (RF) ion source RIG-10 is presented. Due to the ambipolar characteristics of a discharge operating with hydrogen gas, the model consists of an equation for the space charge imbalance, Poisson's equation for the self-consistent presheath potential and the ion momentum transport equation. For a relatively broad range of operation and design parameters, the model allows the reproduction and prediction of the RF discharge behaviour in a systematic way and, hence, computes the 2D distribution of the ion current density within the source. By implementing relevant discharge physics, the model can provide an appropriate tool for ion source design with respect to an application in the field of neutral beam injection. (author)

  14. Deposition stress effects on thermal barrier coating burner rig life

    Science.gov (United States)

    Watson, J. W.; Levine, S. R.

    1984-01-01

    A study of the effect of plasma spray processing parameters on the life of a two layer thermal barrier coating was conducted. The ceramic layer was plasma sprayed at plasma arc currents of 900 and 600 amps onto uncooled tubes, cooled tubes, and solid bars of Waspalloy in a lathe with 1 or 8 passes of the plasma gun. These processing changes affected the residual stress state of the coating. When the specimens were tested in a Mach 0.3 cyclic burner rig at 1130 deg C, a wide range of coating lives resulted. Processing factors which reduced the residual stress state in the coating, such as reduced plasma temperature and increased heat dissipation, significantly increased coating life.

  15. Westinghouse says cartel rigged U.S. uranium market

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    On Oct. 15, 1976, Westinghouse filed a complaint in Federal court in Chicago charging that 29 U.S. and foreign uranium producers damaged Westinghouse by illegally rigging the uranium market; they also link the Atomic Industrial Forum to the U.S. activities of this cartel. Background information is presented for the charge, which has become the focal point of Westinghouse's defense against the uranium supply breach of contract suits filed against the firm by 27 electric utilities (3 filed in county court in Pittsburgh, 24 jointly in Federal court in Virginia). Westinghouse attorneys say that most of the evidence they have shows the existence of a cartel in the past, but they hope to show it is still operating in the U.S

  16. Dynamic Investigation Test-rig on hAptics (DITA)

    International Nuclear Information System (INIS)

    Cannella, F; Olivieri, E; Caldwell, D G; Scalise, L; Memeo, M

    2013-01-01

    Research on tactile sensitivity has been conducted since the last century and many devices have been proposed to study in detail this sense through experimental tests. The sense of touch is essential in every-day life of human beings, but it can also play a fundamental role for the assessment of some neurological disabilities and pathologies. In fact, the level of tactile perception can provide information on the health state of the nervous system. In this paper, authors propose the design and development of a novel test apparatus, named DITA (Dynamic Investigation Test-rig on hAptics), aiming to provide the measurement of the tactile sensitivity trough the determination of the Just Noticeable Difference (JND) curve of a subject. The paper reports the solution adopted for the system design and the results obtained on the set of experiments carried out on volunteers

  17. Field Engineers' Scheduling at Oil Rigs: a Case Study

    Directory of Open Access Journals (Sweden)

    Y. S. Usmani

    2012-02-01

    Full Text Available Oil exploration and production operations face a number of challenges. Professional planners have to design solutions for various practical problems or issues. However, the time consumed is often very extensive because of the large number of possible solutions. Further, the matter of choosing the best solution remains. The present paper investigates a problem related to leading companies in the energy and chemical manufacturing sector of the oil and gas industry. Each company’s field engineers are expensive and valuable assets. Therefore, an optimized roster is rather important. In the present paper, the objective is to design a field engineers’ schedule which would be both feasible and satisfying towards the various demands of rigs, with minimum operational cost to the company. An efficient and quick optimization technique is presented to schedule the shifts of field engineers.

  18. Development and Initial Testing of the Tiltrotor Test Rig

    Science.gov (United States)

    Acree, C. W., Jr.; Sheikman, A. L.

    2018-01-01

    The NASA Tiltrotor Test Rig (TTR) is a new, large-scale proprotor test system, developed jointly with the U.S. Army and Air Force, to develop a new, large-scale proprotor test system for the National Full-Scale Aerodynamics Complex (NFAC). The TTR is designed to test advanced proprotors up to 26 feet in diameter at speeds up to 300 knots, and even larger rotors at lower airspeeds. This combination of size and speed is unprecedented and is necessary for research into 21st-century tiltrotors and other advanced rotorcraft concepts. The TTR will provide critical data for validation of state-of-the-art design and analysis tools.

  19. Burner rig alkali salt corrosion of several high temperature alloys

    Science.gov (United States)

    Deadmore, D. L.; Lowell, C. E.

    1977-01-01

    The hot corrosion of five alloys was studied in cyclic tests in a Mach 0.3 burner rig into whose combustion chamber various aqueous salt solutions were injected. Three nickel-based alloys, a cobalt-base alloy, and an iron-base alloy were studied at temperatures of 700, 800, 900, and 1000 C with various salt concentrations and compositions. The relative resistance of the alloys to hot corrosion attack was found to vary with temperature and both concentration and composition of the injected salt solution. Results indicate that the corrosion of these alloys is a function of both the presence of salt condensed as a liquid on the surface and of the composition of the gas phases present.

  20. Vital signs: drilling rush accelerates, led by stellar B.C. natural gas discoveries

    International Nuclear Information System (INIS)

    Lunan, D.

    2001-01-01

    A recent survey of drilling activity in the Western Canadian Sedimentary Basin provide clear evidence of intensified efforts to match the aggressive forecast of 17,500 well completions in 2001, forecast by the Petroleum Services Association of Canada, or the 18,500 new wells forecast by the Canadian Association of Oilwell Drilling Contractors, and satisfy the expected strong natural gas demand. The rush for drilling properties boosted first-quarter land sale bonus payments by 78 per cent to more than $500 million, or about $356 per hectare from $282 million or $256 per hectare in the first three months of 2000. Land acquisition is most robust in northeastern British Columbia, where a series of 50-million-cubic feet-per-day discoveries in the Ladyfern region has ignited the hottest exploration play of this year, resulting in a 400 per cent increase in first quarter bonus payments to $212 million, or $613 per hectare. Overall Western Canada rig count peaked at 614 active units in late February, declining since to 264 rigs in April, due to the onset of spring breakup. Success rate in the first quarter of 2001 for exploratory drilling peaked at 72 per cent, up from 53 per cent a year ago. Industry-wide success rate jumped to 83 per cent from 75 per cent in 2000. Average depth in BC in the first quarter of 2001 reached 1,700 metres, the highest in Western Canada, compared to about 1,300 metres a year ago. Industry-wide, the average depth slipped from 1,143 metres to 1,134 metres, reflecting the continuing reliance on shallow gas drilling in an effort to attach known reserves as quickly as possible. Offshore drilling on East Coast provides a different picture: drilling depth averages climbed to 10,339 metres from 7,131 metres in 2000. Discovery of the Deep Panuke field by PanCanadian Petroleum is considered partly responsible for the sudden increase in well depth. tabs., 2 photos

  1. Core Drilling of shallow drillholes OL-PP72...OL-PP89 at Olkiluoto, Eurajoki 2011

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Suomen Malmi Oy, Espoo (Finland)

    2012-05-15

    Suomen Malmi Oy (Smoy) core drilled eighteen drillholes to survey the ground and bedrock conditions in the encapsulation plant building site at Olkiluoto, Eurajoki 2011. Soil quality, bedrock depth and quality of near surface bedrock were investigated in this project. The drillholes were drilled between 19th of October and 8th of November 2011. The lengths of the drillholes are mostly between 7 to 9 metres, except for the drillhole OL-PP79, which is 15 metres by length. The drillholes are 76 mm by diameter, and the core diameter is 60.2 mm. The lightweight GM75 drilling rig with rubber tracks was used. The drilling water was taken from the ONKALO area research building freshwater pipeline and sodium fluorescein was added as a label agent in the drilling water. The drillholes were not left open. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The average natural fracture frequencies of the drillcores range from 2.5 pc/m (OL-PP77) to 11.8 pc/m (OL-PP86). The average RQD ranges from 55.1 % (OL-PP86) to 96.4 % (OL-PP77). The penetrated soils are mostly ground fill (blast rock), but some clays and sands are lying below the fill layer. (orig.)

  2. Core Drilling of shallow drillholes OL-PP72...OL-PP89 at Olkiluoto, Eurajoki 2011

    International Nuclear Information System (INIS)

    Toropainen, V.

    2012-05-01

    Suomen Malmi Oy (Smoy) core drilled eighteen drillholes to survey the ground and bedrock conditions in the encapsulation plant building site at Olkiluoto, Eurajoki 2011. Soil quality, bedrock depth and quality of near surface bedrock were investigated in this project. The drillholes were drilled between 19th of October and 8th of November 2011. The lengths of the drillholes are mostly between 7 to 9 metres, except for the drillhole OL-PP79, which is 15 metres by length. The drillholes are 76 mm by diameter, and the core diameter is 60.2 mm. The lightweight GM75 drilling rig with rubber tracks was used. The drilling water was taken from the ONKALO area research building freshwater pipeline and sodium fluorescein was added as a label agent in the drilling water. The drillholes were not left open. In addition to drilling the drillcores were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The average natural fracture frequencies of the drillcores range from 2.5 pc/m (OL-PP77) to 11.8 pc/m (OL-PP86). The average RQD ranges from 55.1 % (OL-PP86) to 96.4 % (OL-PP77). The penetrated soils are mostly ground fill (blast rock), but some clays and sands are lying below the fill layer. (orig.)

  3. Drilling a borehole for LEP

    CERN Multimedia

    1981-01-01

    Boreholes were drilled along the earlier proposed line of the LEP tunnel under the Jura to find out the conditions likely to be encountered during the construction of the LEP tunnel (Annual Report 1981 p. 106, Fig. 10).

  4. Computed tomography of drill cores

    International Nuclear Information System (INIS)

    Taylor, T.

    1985-08-01

    A preliminary computed tomography evaluation of drill cores of granite and sandstone has generated geologically significant data. Density variations as small as 4 percent and fractures as narrow as 0.1 mm were easily detected

  5. Geothermal drilling in Cerro Prieto

    Energy Technology Data Exchange (ETDEWEB)

    Dominguez A., Bernardo

    1982-08-10

    The number of characteristics of the different wells that have been drilled in the Cerro Prieto geothermal field to date enable one to summarize the basic factors in the applied technology, draw some conclusions, improve systems and procedures, and define some problems that have not yet been satisfactorily solved, although the existing solution is the best now available. For all practical purposes, the 100 wells drilled in the three areas or blocks into which the Cerro Prieto field has been divided have been completed. Both exploratory and production wells have been drilled; problems of partial or total lack of control have made it necessary to abandon some of these wells, since they were unsafe to keep in production or even to be used for observation and/or study. The wells and their type, the type of constructed wells and the accumulative meters that have been drilled for such wells are summarized.

  6. Substantial Fatigue Similarity of a New Small-Scale Test Rig to Actual Wheel-Rail System

    NARCIS (Netherlands)

    Naeimi, M.; Li, Z.; Petrov, R.H.; Dollevoet, R.P.B.J.; Sietsma, J.; Wu, J.

    2014-01-01

    The substantial similarity of fatigue mechanism in a new test rig for rolling contact fatigue (RCF) has been investigated. A new reduced-scale test rig is designed to perform controlled RCF tests in wheel-rail materials. The fatigue mechanism of the rig is evaluated in this study using a combined

  7. Synthesis of engineering designs of drilling facilities

    Science.gov (United States)

    Porozhsky, K.

    2018-03-01

    The article sets forth key principles of engineering of drilling equipment based on successive analysis of the goals of the production method, technologies of its implementation and conditions of mineral mining using a new approach to systematization of drilling methods. Potential advancement in the technologies and equipment of drilling is illustrated in terms of oil-well drilling.

  8. Drilling a better pair : new technologies in SAGD directional drilling

    Energy Technology Data Exchange (ETDEWEB)

    Zimmer, C.; Richter, D. [Statoil Canada Ltd., Calgary, AB (Canada); Person, J.; Tilley, J.; Bittar, M. [Halliburton Energy Services, Calgary, AB (Canada)

    2010-07-01

    The Leismer Demonstration Project (LDP) is the first of 8 proposed major steam assisted gravity drainage (SAGD) projects for Statoil's Kai Kos Dehseh (KKD) asset in the Athabasca oil sands deposit. The bitumen resources are expected to produce approximately 2.2 billion barrels of oil over approximately 35 years with a peak production of 220,000 bbl/day. To date, 23 well pairs have been drilled on 4 drilling pads. The precise placement of well pairs is among the most important factors in a successful SAGD drilling program. The producer well must be placed in relation to the reservoir boundaries. It must also be accurately twinned with the injector well. A strong focus on technological innovation is needed in order to deliver on these high expectations in unconsolidated formations, such as the McMurray oil sands. Lateral SAGD pairs are often drilled with conventional steerable mud motors and logging-while-drilling (LWD) resistivity measurements, but this combination imposes certain limitations in terms of wellbore quality and placement. Several industry firsts were successfully implemented at the Statoil LDP, including a combination of the newest and most cutting-edge directional, measurement, and LWD technology. The keystone of these industry firsts was the use of a soft formation modified, point-the-bit rotary steerable system (RSS), used on 20 horizontal wells. The RRS was combined with an ultra deep azimuthal resistivity sensor to provide precise geosteering along the bottom bed boundary in the producer wells, resulting in improved reservoir capture and reservoir characterization. This paper described the new drilling system and its impact on the progressive future of directional drilling in SAGD. 8 refs., 1 tab., 22 figs.

  9. Interactive Drilling Using Real-time LWD A Chevron Nigeria Ltd And Schlumberger Experience

    International Nuclear Information System (INIS)

    Parvez, B.; Ingham, S.; Raginal, O.; Osman, K.

    2002-01-01

    CNL's experience is that the most effective means of GeoSteering horizontal wells is to co-locate the GeoSteering and multi-disciplinary Asset teams in Central location and not at the well site. Real-Time Logging-While-Drilling and reliable data transmissions are both key to successful interactive drilling from a remote location. The accuracy and quality of LWD Real-Time measurements and their use for true geological and GeoSteering evaluation are presented in this paper.Customization of data frames and samples time to acquire a real-time log suite suitable for a specific geological problem will be discussed first then the effects of the drilling environments on sensor response, the relationship of specified sensor accuracy to logging speeds and data transmission rates. The paper then proceeds to the different sources of noise on real-time data and quality control procedures like filter mechanism, spectral analysis and recapturing of the LWD data on the rig.After a brief description of data transmission systems the paper will end with discussion on use of while drilling data for true geological and GeoSteering evaluation and implementation of some new evaluation concepts, decision trees and best practices.Examples will illustrate the customization of data frames. Effects of rate of penetration, tool rotation, sample time on real-time data. Real-time log interpretation like effects of approaching bed boundary, anisotropy and invasion and of hole enlargement

  10. Running casing on conventional wells with Casing Drilling {sup TM} technology

    Energy Technology Data Exchange (ETDEWEB)

    Warren, T.M.; Schneider, W.P.; Johns, R.P.; Zipse, K.D. [Tesco Corp., Calgary, AB (Canada)

    2004-07-01

    Casing Drilling{sup TM} is a newly developed and efficient well construction method that combines drilling and casing running processes into a single operation. This radical change to the entire well casing running process eliminates standard components and processes that are inefficient and hazardous. The commercialization of this new technology has resulted in the development of custom equipment and procedures designed to efficiently handle casings on a drilling rig, including conventionally drilled wells. The technology offers safer casing running operations and makes it possible to ream casing to the bottom. In addition, less people are needed to operate the portable Casing Drive System (CDS). One of the primary components of the system is the top drive which provides the power for rotation and torque. The CDS supports full axial and torsional load for running the casing. The well can be circulated while running the casing. The casing can be washed and reamed to the bottom whenever a tight hole is encountered. Thirty one operators have successfully used the CDS on more than 150 onshore and offshore wells in 7 countries. 13 refs., 2 tabs., 12 figs.

  11. Model based flow measurement using venturi flumes for return flow during drilling

    Directory of Open Access Journals (Sweden)

    Ivan Pirir

    2017-07-01

    Full Text Available In an oil well drilling operation, a proper knowledge of the return fluid flowrate is necessary both for the stabilization of the bottom hole pressure of the well and also as a primary indication of a kick or loss. In practice, the drill fluid flowing through the return line is usually measured with Coriolis meters. However this method is both expensive and has some downsides. For instance there is a risk of blockage due to drill cuttings while measuring the discharge. The presence of gas and cuttings in the drilling fluid will also have a negative effect in the measurement i.e. for multi-phase fluid, the readings from Coriolis meters may not be accurate. A cheaper alternative would be to use an open channel for the measurement of the discharge from the return flowline. In this paper, a venturi rig is used as the open channel and modeled by the Saint Venant equations. Experimental verification of the simulation results show a promising behavior of the model based measurement of the return fluid flow.

  12. Core drilling of deep borehole OL-KR39 at Olkiluoto in Eurajoki 2005

    Energy Technology Data Exchange (ETDEWEB)

    Niinimaeki, R. [Suomen Malmi Oy, Espoo (Finland)

    2005-11-15

    Posiva Oy submitted an application to the Finnish Government in May 1999 for the Decision in Principle to choose Olkiluoto in the municipality of Eurajoki as the site of the final disposal facility for spent nuclear fuel. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the decision in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 502.97 m and 45.11 m deep boreholes with a diameter of 75.7 mm at Olkiluoto in August- October 2005. The identification numbers of the boreholes are OL-KR39 and OL-KR39B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded drilling parameters. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and flushing water were 415m{sup 3} and 25 m{sup 3} and the measured volumes of the returning water were 175 m{sup 3} and 7 m{sup 3} in boreholes OLKR39 and OL-KR39B, respectively. The deviation of the borehole was measured with the deviation measuring instruments EMS and Maxibor. Uniaxial compressive strength, Young's Modulus and Poisson' s ratio were measured from the core samples. The average uniaxial compressive strength is about 110 MPa, the average Young's Modulus is 49 GP a and the average Poisson' s ratio is 0.25. The main rock types are migmatitic mica gneiss and granite. Filled fracture is the most common

  13. Core drilling of deep borehole OL-KR37 at Olkiluoto in Eurajoki 2005

    Energy Technology Data Exchange (ETDEWEB)

    Niinimaeki, R. [Suomen Malmi Oy, Espoo (Finland)

    2005-11-15

    Posiva Oy submitted an application to the Finnish Government in May 1999 for the Decision in Principle to choose Olkiluoto in the municipality of Eurajoki as the site of the final disposal facility for spent nuclear fuel. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the decision in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 350.00 m and 45.10 m deep boreholes with a diameter of 75.7 mm at Olkiluoto in June- August 2005. The identification numbers of the boreholes are OL-KR37 and OL-KR37B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded information about drilling parameters. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and flushing water were 273 m{sup 3} and 21m{sup 3} and the measured volumes of the returning water were 221m{sup 3} and 16m{sup 3} in boreholes OL-KR37 and OL-KR37B, respectively. The deviation of the borehole was measured with the deviation measuring instruments EMS and Maxibor. Uniaxial compressive strength, Young's Modulus and Poisson' s ratio were measured from the core samples. The average uniaxial compressive strength is about 106 MPa, the average Young's modulus is 40 GPa and the average Poisson's ratio is 0.20. The main rock types are migmatitic mica gneiss, granite and tonalite. Filled

  14. Core drilling of deep borehole OL-KR39 at Olkiluoto in Eurajoki 2005

    International Nuclear Information System (INIS)

    Niinimaeki, R.

    2005-11-01

    Posiva Oy submitted an application to the Finnish Government in May 1999 for the Decision in Principle to choose Olkiluoto in the municipality of Eurajoki as the site of the final disposal facility for spent nuclear fuel. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the decision in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 502.97 m and 45.11 m deep boreholes with a diameter of 75.7 mm at Olkiluoto in August- October 2005. The identification numbers of the boreholes are OL-KR39 and OL-KR39B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded drilling parameters. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and flushing water were 415m 3 and 25 m 3 and the measured volumes of the returning water were 175 m 3 and 7 m 3 in boreholes OLKR39 and OL-KR39B, respectively. The deviation of the borehole was measured with the deviation measuring instruments EMS and Maxibor. Uniaxial compressive strength, Young's Modulus and Poisson' s ratio were measured from the core samples. The average uniaxial compressive strength is about 110 MPa, the average Young's Modulus is 49 GP a and the average Poisson' s ratio is 0.25. The main rock types are migmatitic mica gneiss and granite. Filled fracture is the most common fracture type. The average fracture

  15. Core drilling of deep borehole OL-KR43 at Olkiluoto in Eurajoki 2006

    Energy Technology Data Exchange (ETDEWEB)

    Niinimaeki, R. [Suomen Malmi Oy, Espoo (Finland)

    2006-12-15

    Posiva Oy submitted an application to the Finnish Government in May 1999 for the Decision in Principle to choose Olkiluoto in the municipality of Eurajoki as the site of the final disposal facility for spent nuclear fuel. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the decision in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 1000.26 m and 45.01 m deep boreholes with a diameter of 75.7 mm at Olkiluoto in July - October 2006. The identification numbers of the boreholes are OL-KR43 and OL-KR43B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded drilling parameters. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and flushing water were 1103 m{sup 3} and 16 m{sup 3} in boreholes OL-KR43 and OL-KR43B, respectively. Measured volumes of the returning water were 916m{sup 3} in borehole OL-KR43 and 13m{sup 3} in borehole OL-KR43B. The deviation of the boreholes was measured with the deviation measuring instruments EMS and Maxibor. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength is about 131 MPa, the average Young's Modulus is 37 GPa and the average Poisson's ratio is 0.19. The main rock types are veined gneiss, diatexitic gneiss

  16. Core drilling of deep borehole OL-KR46 at Olkiluoto in Eurajoki 2007

    International Nuclear Information System (INIS)

    Toropainen, V.

    2007-09-01

    Posiva Oy submitted an application to the Finnish Government in May 1999 for the Decision in Principle to choose Olkiluoto in the municipality of Eurajoki as the site of the final disposal facility for spent nuclear fuel. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the decision in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 600.10 m and 45.16 m deep boreholes with a diameter of 75.7 mm at Olkiluoto in May - June 2007. The identification numbers of the boreholes are OL-KR46 and OL-KR46B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the returning water, and the volume of drilling water were recorded. The drill rig was computer controlled and during drilling the computer recorded drilling parameters. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and flushing water were 466 m 3 and 20 m 3 in boreholes OL-KR46 and OL-KR46B, respectively. Measured volumes of the returning water were 407 m 3 in borehole OL-KR46 and 12 m 3 in borehole OL-KR46B. The deviation of the boreholes was measured with the deviation measuring instruments EMS and Maxibor. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength is 116.5 MPa, the average Young's Modulus is 31.5 GPa and the average Poisson's ratio is 0.20. The main rock types are veined gneiss, tonalitic-granodioritic-granitic gneiss and pegmatite

  17. Core drilling of deep drillhole OL-KR47 at Olkiluoto in Eurajoki 2007-2008

    International Nuclear Information System (INIS)

    Toropainen, V.

    2008-02-01

    As a part of the confirming site investigations for ONKALO rock characterisation facility, Suomen Malmi Oy (Smoy) core drilled 1008.76 m and 44.31 m deep drillholes with a diameter of 75.7 mm at Olkiluoto in October 2007 - January 2008. The identification numbers of the drillholes are OL-KR47 and OL-KR47B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the returning and drilling waters were recorded. The drill rig was computer controlled and during drilling the computer recorded drilling parameters. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and flushing water were 1229 m 3 and 13.6 m 3 in drillholes OL-KR47 and OL-KR47B, respectively. Measured volume of the returning water in drillhole OL-KR47 was 1125 m 3 , water did not return in drillhole OL-KR47B. The deviation of the drillholes was measured with the deviation measuring instruments EMS and Maxibor II. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength is 92.1 MPa, the average Young's Modulus is 32.5 GPa and the average Poisson's ratio is 0.33. The main rock types are diatexitic and veined gneisses, pegmatitic granite and tonaliticgranodioritic- granitic gneiss. The average fracture frequency is 2.2 pcs / m in drillhole OL-KR47 and 3.4 pcs / m in drillhole OL-KR47B. The average RQD values were 95.3 % and 94.1 %. In drillhole OL-KR47 46 fractured zones and in drillhole OL-KR47B two fractured zones were penetrated during drilling work. (orig.)

  18. Core drilling of deep drillhole OL-KR45 at Olkiluoto in Eurajoki 2007

    International Nuclear Information System (INIS)

    Toropainen, V.

    2007-11-01

    Posiva Oy submitted an application to the Finnish Government in May 1999 for the Decision in Principle to choose Olkiluoto in the municipality of Eurajoki as the site of the final disposal facility for spent nuclear fuel. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the decision in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 1023.30 m and 44.75 m deep drillholes with a diameter of 75.7 mm at Olkiluoto in June - September 2007. The identification numbers of the drillholes are OL-KR45 and OL-KR45B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the returning and drilling waters were recorded. The drill rig was computer controlled and during drilling the computer recorded drilling parameters. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and washing water were 1186 m 3 and 19 m 3 in drillholes OL-KR45 and OL-KR45B, respectively. Measured volumes of the returning water were 962 m 3 in drillhole OL-KR45 and 15 m 3 in drillhole OL-KR45B. The deviation of the drillholes was measured with the deviation measuring instruments EMS and Maxibor II. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength is 126.2 MPa, the average Young's Modulus is 42.5 GPa and the average Poisson's ratio is 0.21. The main rock types are veined and diatexitic gneisses, pegmatitic granite and tonalitic

  19. Rotary steerable motor system for underground drilling

    Science.gov (United States)

    Turner, William E [Durham, CT; Perry, Carl A [Middletown, CT; Wassell, Mark E [Kingwood, TX; Barbely, Jason R [Middletown, CT; Burgess, Daniel E [Middletown, CT; Cobern, Martin E [Cheshire, CT

    2008-06-24

    A preferred embodiment of a system for rotating and guiding a drill bit in an underground bore includes a drilling motor and a drive shaft coupled to drilling motor so that drill bit can be rotated by the drilling motor. The system further includes a guidance module having an actuating arm movable between an extended position wherein the actuating arm can contact a surface of the bore and thereby exert a force on the housing of the guidance module, and a retracted position.

  20. RIG-I antiviral signaling drives interleukin-23 production and psoriasis-like skin disease.

    Science.gov (United States)

    Zhu, Huiyuan; Lou, Fangzhou; Yin, Qianqian; Gao, Yuanyuan; Sun, Yang; Bai, Jing; Xu, Zhenyao; Liu, Zhaoyuan; Cai, Wei; Ke, Fang; Zhang, Lingyun; Zhou, Hong; Wang, Hong; Wang, Gang; Chen, Xiang; Zhang, Hongxin; Wang, Zhugang; Ginhoux, Florent; Lu, Chuanjian; Su, Bing; Wang, Honglin

    2017-05-01

    Retinoic acid inducible-gene I (RIG-I) functions as one of the major sensors of RNA viruses. DDX58 , which encodes the RIG-I protein, has been newly identified as a susceptibility gene in psoriasis. Here, we show that the activation of RIG-I by 5'ppp-dsRNA, its synthetic ligand, directly causes the production of IL-23 and triggers psoriasis-like skin disease in mice. Repeated injections of IL-23 to the ears failed to induce IL-23 production and a full psoriasis-like skin phenotype, in either germ-free or RIG-I-deficient mice. RIG-I is also critical for a full development of skin inflammation in imiquimod (IMQ)-induced psoriasis-like mouse model. Furthermore, RIG-I-mediated endogenous IL-23 production was mainly confined to the CD11c + dendritic cells (DCs) via nuclear factor-kappa B (NF-κB) signaling, and stimulated RIG-I expression in an auto-regulatory feedback loop. Thus, our data suggest that the dysregulation in the antiviral immune responses of hosts through the innate pattern recognition receptors may trigger the skin inflammatory conditions in the pathophysiology of psoriasis. © 2017 The Authors. Published under the terms of the CC BY 4.0 license.

  1. Parameter definition using vibration prediction software leads to significant drilling performance improvements

    Energy Technology Data Exchange (ETDEWEB)

    Amorim, Dalmo; Hanley, Chris Hanley; Fonseca, Isaac; Santos, Juliana [National Oilwell Varco, Houston TX (United States); Leite, Daltro J.; Borella, Augusto; Gozzi, Danilo [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    The understanding and mitigation of downhole vibration has been a heavily researched subject in the oil industry as it results in more expensive drilling operations, as vibrations significantly diminish the amount of effective drilling energy available to the bit and generate forces that can push the bit or the Bottom Hole Assembly (BHA) off its concentric axis of rotation, producing high magnitude impacts with the borehole wall. In order to drill ahead, a sufficient amount of energy must be supplied by the rig to overcome the resistance of the drilling system, including the reactive torque of the system, drag forces, fluid pressure losses and energy dissipated by downhole vibrations, then providing the bit with the energy required to fail the rock. If the drill string enters resonant modes of vibration, not only does it decreases the amount of available energy to drill, but increases the potential for catastrophic downhole equipment and drilling bit failures. In this sense, the mitigation of downhole vibrations will result in faster, smoother, and cheaper drilling operations. A software tool using Finite Element Analysis (FEA) has been developed to provide better understanding of downhole vibration phenomena in drilling environments. The software tool calculates the response of the drilling system at various input conditions, based on the design of the wellbore along with the geometry of the Bottom Hole Assembly (BHA) and the drill string. It identifies where undesired levels of resonant vibration will be driven by certain combinations of specific drilling parameters, and also which combinations of drilling parameters will result in lower levels of vibration, so the least shocks, the highest penetration rate and the lowest cost per foot can be achieved. With the growing performance of personal computers, complex software systems modeling the drilling vibrations using FEA has been accessible to a wider audience of field users, further complimenting with real time

  2. Diagnostic System of Drill Condition in Laminated Chipboard Drilling Process

    Directory of Open Access Journals (Sweden)

    Swiderski Bartosz

    2017-01-01

    Full Text Available The paper presents an on-line automatic system for recognition of the drill condition in a laminated chipboard drilling process. Two states of the drill are considered: the sharp enough (still able to drill holes acceptable for processing quality and worn out (excessive drill wear, not satisfactory from the quality point of view of the process. The automatic system requires defining the diagnostic features, which are used as the input attributes to the classifier. The features have been generated from 5 registered signals: feed force, cutting torque, noise, vibration and acoustic emission. The statistical parameters defined on the basis of the auto regression model of these signals have been used as the diagnostic features. The sequential step-wise feature selection is applied for choosing the most discriminative set of features. The final step of recognition is done by support vector machine classifier working in leave one out mode. The results of numerical experiments have confirmed good quality of the proposed diagnostic system.

  3. Duck RIG-I CARD Domain Induces the Chicken IFN-β by Activating NF-κB

    Directory of Open Access Journals (Sweden)

    Yang Chen

    2015-01-01

    Full Text Available Retinoic acid-inducible gene I- (RIG-I- like receptors (RLRs have recently been identified as cytoplasmic sensors for viral RNA. RIG-I, a member of RLRs family, plays an important role in innate immunity. Although previous investigations have proved that RIG-I is absent in chickens, it remains largely unknown whether the chicken can respond to RIG-I ligand. In this study, the eukaryotic expression vectors encoding duRIG-I full length (duck RIG-I, containing all domains, duRIG-I N-terminal (containing the two caspase activation and recruitment domain, CARDs, and duRIG-I C-terminal (containing helicase and regulatory domains labeled with 6*His tags were constructed successfully and detected by western blotting. Luciferase reporter assay and enzyme-linked immunosorbent assay (ELISA detected the duRIG-I significantly activated NF-κB and induced the expression of IFN-β when polyinosinic-polycytidylic acid (poly[I:C], synthetic double-stranded RNA challenges chicken embryonic fibroblasts cells (DF1 cells, while the duRIG-I was inactive in the absence of poly[I:C]. Further analysis revealed that the CARDs (duRIG-I-N induced IFN-β production regardless of the presence of poly[I:C], while the CARD-lacking duRIG-I (duRIG-I-C was not capable of activating downstream signals. These results indicate that duRIG-I CARD domain plays an important role in the induction of IFN-β and provide a basis for further studying the function of RIG-I in avian innate immunity.

  4. Implementation of improved underbalanced drilling in AbuDhabi onshore field

    Science.gov (United States)

    Alhammadi, Adel Mohammed

    Abu Dhabi Company for Onshore Oil Operations (ADCO) is considering Underbalanced Drilling (UBD) as a means to develop lower permeability units in its fields. In addition to productivity and recovery gains, ADCO also expects reservoir characterization benefits from UBD. Reservoir screening studies were carried out on all of ADCO's reservoirs to determine their applicability for UBD. The primary business benefits of UBD were determined to be reservoir characterization, damage Mitigation, and rate of Penetration "ROP" Improvement. Apart from the primary benefits, some of the secondary benefits of UBD that were identified beforehand included rig performance. Since it's a trial wells, the challenge was to drill these wells safely, efficiently and of course meeting well objectives. Many operators worldwide drill these well in underbalanced mode but complete it overbalanced. In our case the plan was to drill and complete these wells in underbalanced condition. But we had to challenge most operators and come up with special and unique casing hanger design to ensure well control barriers exists while fishing the control line of the Downhole Deployment Valve "DDV". After intensive studies and planning, the hanger was designed as per our recommendations and found to be effective equipment that optimized the operational time and the cost as well. This report will provide better understanding of UBD technique in general and shade on the special designed casing hanger compared to conventional or what's most used worldwide. Even thought there were some issues while running the casing hanger prior drilling but managed to capture the learning's from each well and re-modified the hanger and come up with better deign for the future wells. Finally, the new design perform a good performance of saving the operation time and assisting the project to be done in a safe and an easy way without a major impact on the well cost. This design helped to drill and complete these wells safely with

  5. Wythenshawe boiler rig. Thirty years of support to the UK nuclear power industry

    International Nuclear Information System (INIS)

    Rudge, Andy; Woolsey, Ian S.; Moore, Andrew

    2010-01-01

    The Wythenshawe Boiler Rig in Manchester, UK, recently celebrated thirty years of operation in support of the UK nuclear power industry. The Boiler Rig, owned by EDF Energy and operated on EDF Energy's behalf by Serco plc, is a full scale once-through boiler test facility for the investigation of chemistry and corrosion related topics. This paper presents an overview of the design and operation of the Boiler Rig together with some of the technical highlights from its thirty years of operation, many of which have relevance to power plant operations beyond those plants for which the work was performed. (orig.)

  6. Endurance test for IR rig for RI production assembly (test procedure)

    International Nuclear Information System (INIS)

    Chung, Heung June; Ryu, Jeong Soo

    2000-08-01

    This test procedure details the test loop, test method, and test procedure for pressure drop, vibration and endurance test of IR Rig for RI production. From the pressure drop test, the hydraulic design requirements of the capsule are verified. HANARO limit condition is checked and the compatibility with HANARO core is verified. From flow induced vibration test vibration frequency and displacement are investigated. The wear of IR Rig is investigated through endurance test, and these data are used to evaluate the expected wear at maximum resident time of the IR Rig for RI production

  7. Pigeon RIG-I Function in Innate Immunity against H9N2 IAV and IBDV

    Directory of Open Access Journals (Sweden)

    Wenping Xu

    2015-07-01

    Full Text Available Retinoic acid-inducible gene I (RIG-I, a cytosolic pattern recognition receptor (PRR, can sense various RNA viruses, including the avian influenza virus (AIV and infectious bursal disease virus (IBDV, and trigger the innate immune response. Previous studies have shown that mammalian RIG-I (human and mice and waterfowl RIG-I (ducks and geese are essential for type I interferon (IFN synthesis during AIV infection. Like ducks, pigeons are also susceptible to infection but are ineffective propagators and disseminators of AIVs, i.e., “dead end” hosts for AIVs and even highly pathogenic avian influenza (HPAI. Consequently, we sought to identify pigeon RIG-I and investigate its roles in the detection of A/Chicken/Shandong/ZB/2007 (H9N2 (ZB07, Gansu/Tianshui (IBDV TS and Beijing/CJ/1980 (IBDV CJ-801 strains in chicken DF-1 fibroblasts or human 293T cells. Pigeon mRNA encoding the putative pigeon RIG-I analogs was identified. The exogenous expression of enhanced green fluorescence protein (EGFP-tagged pigeon RIG-I and caspase activation and recruitment domains (CARDs, strongly induced antiviral gene (IFN-β, Mx, and PKR mRNA synthesis, decreased viral gene (M gene and VP2 mRNA expression, and reduced the viral titers of ZB07 and IBDV TS/CJ-801 virus strains in chicken DF-1 cells, but not in 293T cells. We also compared the antiviral abilities of RIG-I proteins from waterfowl (duck and goose and pigeon. Our data indicated that waterfowl RIG-I are more effective in the induction of antiviral genes and the repression of ZB07 and IBDV TS/CJ-801 strain replication than pigeon RIG-I. Furthermore, chicken melanoma differentiation associated gene 5(MDA5/ mitochondrial antiviral signaling (MAVS silencing combined with RIG-I transfection suggested that pigeon RIG-I can restore the antiviral response in MDA5-silenced DF-1 cells but not in MAVS-silenced DF-1 cells. In conclusion, these results demonstrated that pigeon RIG-I and CARDs have a strong antiviral

  8. Freon Rig design for performing to heat transfer experiments for nuclear reactors fuel bundles

    International Nuclear Information System (INIS)

    Flores, L.F.V.

    1981-01-01

    The main features of a Freon Rig design for performing to heat transfer experiments for PWR and BWR fuel bundles, are presented. The project is based on a Freon Rig pressurized at 30 bar with a flow rate up to 80 m 3 /h. The maximum power fed to test sections is of about 420 KW D.C. The rig was designed to use scaling techniques wich would enable a fluid of low latente heat to be used in place of water, thereby reducing the cost of testes. (Author) [pt

  9. Western Canada drilling cycle optimization

    International Nuclear Information System (INIS)

    2003-06-01

    The oil and gas industry in western Canada operates in annual and seasonal cycles with peak activity periods that require a large skilled labour force for short periods of time. This study examines why seismic and drilling activity is greatest during the first quarter of the year instead of being distributed evenly over the year. The objective of the study was to provide recommendations that would help optimize the industry cycle. The study includes an analysis of historical trends that validate the industry first quarter peaking activity. It also includes interviews with 36 industry representatives and provides insight and validation of trends. The final phase of the report includes recommendations that both industry and governments may wish to implement. The study includes financial, operational and environmental considerations. It was shown that natural gas directed drilling activity is strongly correlated with changes in natural gas prices. In the case of oil drilling activity, peak activity responds to oil prices from the prior quarter. In general, drilling and seismic costs are higher in the winter months because of increased demand for equipment and services. In addition winter drilling operations require a diesel fired boiler to generate steam. 36 refs., 2 tabs., 52 figs

  10. Review of casing while drilling technology

    Directory of Open Access Journals (Sweden)

    Pavković Bojan

    2016-01-01

    Full Text Available Conventional drilling methods have been plagued with huge operational and financial challenges, such as cost of purchasing, inspecting, handling, transporting the drill equipment and most importantly, tripping in-and-out of the drill string whenever the Bottom Hole Assembly (BHA needs a replacement, needs of wiper trip or when total depth is reached. The tripping in-and-out of the drill string not only contributes to Non Productive Time (NPT but also leads to well control difficulties including wellbore instability and lost circulation. All this has led Oil and Gas industry, as well as any other engineering industry, to seek for new ways and methods in order to reduce these problems. Thanks to the advances in technical solutions and constant improvements of conventional drilling methods, a new drilling method - casing while drilling has been developed. Casing Drilling encompasses the process of simultaneously drilling and casing a well, using the active casing and thus optimizes the production. This paper presents a review of casing while drilling method (CwD and its practical usage in drilling wells. The comparison of conventional drilling method and casing while drilling is also presented. The CwD method achieves significantly better results than conventional drilling method.

  11. Installation of groundwater observation tubes OL-PVP39 - 40 and drilling of shallow drillhole OL-PP90 at Olkiluoto in Eurajoki 2013

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Suomen Malmi Oy, Espoo (Finland)

    2013-11-15

    In order to extend the groundwater monitoring network at Olkiluoto, Posiva Oy contracted Suomen Malmi Oy (Smoy) to install new groundwater observation tubes to two locations and to drill one shallow drillhole with a standpipe. The identification numbers of the groundwater observation tubes are OL-PVP39, OL-PVP40A and 40B, and the shallow drillhole is named OL-PP90. The observation tubes were installed and the shallow hole drilled between July 29th and August 6th in 2013. The drilling rig used in the installation work was a GM-200 rig. Drilling equipment consisted of casing tubes (v 90/77 mm) with drilling bit, 55 mm geo rods and 64 mm drilling bits and T76-equipment for drilling the shallow hole. Monitoring pipes (PVC, v 60/52 mm) were lowered into the holes inside the casings. The monitoring pipes consist of a lower section of riser pipe, a middle section of screen pipe and an upper section of riser pipe. The screen pipe slot size is 0.3 mm and the length of the screen section is two or three metres. Protective stainless steel covers with lock-up caps were installed around the monitoring tubes and the shallow drillholes. In addition to the installation of the tubes, the work included water level measurements after installation. The core samples of the shallow drillhole were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. (orig.)

  12. Installation of groundwater observation tubes OL-PVP36-38 and drilling of shallow drillholes OL-PP70-71 at Olkiluoto in Eurajoki 2011

    International Nuclear Information System (INIS)

    Toropainen, V.

    2012-05-01

    In order to widen the groundwater monitoring network at Olkiluoto, Posiva Oy contracted Suomen Malmi Oy (Smoy) to install new groundwater observation tubes to three locations and to drill two shallow drillholes with standpipes. The identification numbers of the groundwater observation tubes are OL-PVP36, OL-PVP37A, 37B, 37C, OL-PVP38A, 38B, 38C and 38D, and the shallow drillholes are named OL-PP70 and OL-PP71. The observation tubes were installed and the shallow holes drilled between September 22nd and October 12th in 2011. The drilling rig used in the installation work was a GM-200 rig. Drilling equipment consisted of casing tubes (90/77 mm) with drilling bit, 55 mm geo rods and 64 mm drilling bits and T76-equipment for drilling the shallow holes. Monitoring pipes (PVC, 60/52 mm) were lowered into the holes inside the casings. The monitoring pipes consist of a lower section of riser pipe, a middle section of screen pipe and an upper section of riser pipe. The screen pipe slot size is 0.3 mm and the length of the screen section is two metres. Protective stainless steel covers with lock-up caps were installed around the monitoring tubes and the shallow drillholes. In addition to the installation of the tubes, the work included water level measurements after installation. The core samples of the shallow drillholes were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. (orig.)

  13. Installation of groundwater observation tubes OL-PVP36-38 and drilling of shallow drillholes OL-PP70-71 at Olkiluoto in Eurajoki 2011

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Suomen Malmi Oy, Espoo (Finland)

    2012-05-15

    In order to widen the groundwater monitoring network at Olkiluoto, Posiva Oy contracted Suomen Malmi Oy (Smoy) to install new groundwater observation tubes to three locations and to drill two shallow drillholes with standpipes. The identification numbers of the groundwater observation tubes are OL-PVP36, OL-PVP37A, 37B, 37C, OL-PVP38A, 38B, 38C and 38D, and the shallow drillholes are named OL-PP70 and OL-PP71. The observation tubes were installed and the shallow holes drilled between September 22nd and October 12th in 2011. The drilling rig used in the installation work was a GM-200 rig. Drilling equipment consisted of casing tubes (90/77 mm) with drilling bit, 55 mm geo rods and 64 mm drilling bits and T76-equipment for drilling the shallow holes. Monitoring pipes (PVC, 60/52 mm) were lowered into the holes inside the casings. The monitoring pipes consist of a lower section of riser pipe, a middle section of screen pipe and an upper section of riser pipe. The screen pipe slot size is 0.3 mm and the length of the screen section is two metres. Protective stainless steel covers with lock-up caps were installed around the monitoring tubes and the shallow drillholes. In addition to the installation of the tubes, the work included water level measurements after installation. The core samples of the shallow drillholes were logged and reported by geologist. Geological logging included the following parameters: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. (orig.)

  14. 'RIG'- surgical gamma probe for early breast cancer detection

    International Nuclear Information System (INIS)

    Walinjkar, P.B.; Singh, Gursharan; Kumar, Umesh; Pendharkar, A.S.; Choudhary, P.S.

    2004-01-01

    Breast cancer is one of the most common cancers in women, which if detected in early stage can be effectively treated and cured. Early detection is carried out by collecting a sentinel lymph node (SLN) and testing it for cancer. The surgical gamma probe is a hand-held device used in the localization of SLN. It enables the localization of the active node. Isotope Applications Division, BARC has developed indigenously a RIG Surgical Gamma Probe in consultation with the doctors from Rajiv Gandhi Cancer Institute and Research Centre, New Delhi. The system consists of microcomputer-based gamma counting system that displays the number of pulses detected by the probe in counts per second and has an audible signal in direct correlation with the count density. The detector probe is based on the scintillation detector housed in a stainless steel housing with lead collimator. The physical parameters are a high sensitivity of 5000 cps/MBq at probe tip with good spatial resolution. The performance of this probe was clinically evaluated on the basis of spatial resolution and accuracy to detect the active node. (author)

  15. Endoscopic PIV measurements in a low pressure turbine rig

    Energy Technology Data Exchange (ETDEWEB)

    Kegalj, Martin; Schiffer, Heinz-Peter [Technische Universitaet Darmstadt (Germany). Department of Gas Turbines and Aerospace Propulsion

    2009-10-15

    Particle-Image-Velocimetry (PIV) is a useful way to acquire information about the flow in turbomachinery. Several premises have to be fulfilled to achieve high-quality data, for example, optical access, low vibrations and low reflections. However, not all test facilities comply with these requirements. If there is no optical access to the test area, measurements cannot be performed. The use of borescopic optics is a possible solution to this issue, as the access required is very small. Several different techniques can be used to measure the three components of the velocity vector, one of which is Stereo-PIV. These techniques require either large optical access from several viewing angles or highly complex setups. Orthogonal light sheet orientations in combination with borescopic optics using Planar-PIV can deliver sufficient information about the flow. This study will show the feasibility of such an approach in an enclosed test area, such as the interblade space in a Low-Pressure-Turbine-Rig. The results from PIV will be compared with data collected with conventional techniques, such as the Five-Hole-Probe and the 2-component Hot-Wire-Anemometry. An analysis of time- and phase-averaged data will be performed. (orig.)

  16. Core Cutting Test with Vertical Rock Cutting Rig (VRCR)

    Science.gov (United States)

    Yasar, Serdar; Osman Yilmaz, Ali

    2017-12-01

    Roadheaders are frequently used machines in mining and tunnelling, and performance prediction of roadheaders is important for project economics and stability. Several methods were proposed so far for this purpose and, rock cutting tests are the best choice. Rock cutting tests are generally divided into two groups which are namely, full scale rock cutting tests and small scale rock cutting tests. These two tests have some superiorities and deficiencies over themselves. However, in many cases, where rock sampling becomes problematic, small scale rock cutting test (core cutting test) is preferred for performance prediction, since small block samples and core samples can be conducted to rock cutting testing. Common problem for rock cutting tests are that they can be found in very limited research centres. In this study, a new mobile rock cutting testing equipment, vertical rock cutting rig (VRCR) was introduced. Standard testing procedure was conducted on seven rock samples which were the part of a former study on cutting rocks with another small scale rock cutting test. Results showed that core cutting test can be realized successfully with VRCR with the validation of paired samples t-test.

  17. Negative Role of RIG-I Serine 8 Phosphorylation in the Regulatin of Interferon-beta Production

    Energy Technology Data Exchange (ETDEWEB)

    E Nistal-Villan; M Gack; G Martinez-Delgado; N Maharaj; K Inn; H Yang; R Wang; A Aggarwal; J Jung; A Garcia-Sastre

    2011-12-31

    RIG-I (retinoic acid-inducible gene I) and TRIM25 (tripartite motif protein 25) have emerged as key regulatory factors to induce interferon (IFN)-mediated innate immune responses to limit viral replication. Upon recognition of viral RNA, TRIM25 E3 ligase binds the first caspase recruitment domain (CARD) of RIG-I and subsequently induces lysine 172 ubiquitination of the second CARD of RIG-I, which is essential for the interaction with downstream MAVS/IPS-1/CARDIF/VISA and, thereby, IFN-beta mRNA production. Although ubiquitination has emerged as a major factor involved in RIG-I activation, the potential contribution of other post-translational modifications, such as phosphorylation, to the regulation of RIG-I activity has not been addressed. Here, we report the identification of serine 8 phosphorylation at the first CARD of RIG-I as a negative regulatory mechanism of RIG-I-mediated IFN-beta production. Immunoblot analysis with a phosphospecific antibody showed that RIG-I serine 8 phosphorylation steady-state levels were decreased upon stimulation of cells with IFN-beta or virus infection. Substitution of serine 8 in the CARD RIG-I functional domain with phosphomimetic aspartate or glutamate results in decreased TRIM25 binding, RIG-I ubiquitination, MAVS binding, and downstream signaling. Finally, sequence comparison reveals that only primate species carry serine 8, whereas other animal species carry an asparagine, indicating that serine 8 phosphorylation may represent a primate-specific regulation of RIG-I activation. Collectively, these data suggest that the phosphorylation of RIG-I serine 8 operates as a negative switch of RIG-I activation by suppressing TRIM25 interaction, further underscoring the importance of RIG-I and TRIM25 connection in type I IFN signal transduction.

  18. Improving mixing efficiency in a closed circuit water flow rig for ...

    African Journals Online (AJOL)

    . ... pulse velocity method, indicating that the flow meters functioned correctly. The modified rig with scaled-up mixing techniques could serve as platform for training in evaluating mixing vessels and flow meters in industrial process plants.

  19. Intra-abdominal recurrence of colorectal cancer detected by radioimmunoguided surgery (RIGS system)

    International Nuclear Information System (INIS)

    Sardi, A.; Workman, M.; Mojzisik, C.; Hinkle, G.; Nieroda, C.; Martin, E.W. Jr.

    1989-01-01

    Since 1986, 32 patients with metastatic colorectal cancer have undergone second-look radioimmunoguided surgery (RIGS system). The primary tumor was located in the right and transverse colon in 11 patients, left and sigmoid colon in 16, and rectum in five. The carcinoembryonic antigen level was elevated in 30 patients (94%); all patients underwent a computed tomographic scan of the abdomen and pelvis. The overall sensitivity of the computed tomographic scan was 41% (abdomen other than liver, 27%; liver, 58%; and pelvis, 22%). The RIGS system identified recurrent tumor in 81% of the patients. The most common site of metastasis was the liver (41%), independent of the primary location. Local/regional recurrences alone accounted for 40% of all recurrences. In six patients (18%), recurrent tumor was found only with the RIGS system. The RIGS system is more dependable in localizing clinically obscure metastases than other methods, and carcinoembryonic antigen testing remains the most accurate preoperative method to indicate suspected recurrences

  20. The evaluation of secondary system oxygen-scavenging chemicals using a water-circulating rig

    Energy Technology Data Exchange (ETDEWEB)

    Collins, M.W. [Nuclear Dept., HMS Sultan (United Kingdom)

    2002-07-01

    To assess the efficiency, mode of action and possible by-products of chemical dosing agents, e.g. oxygen scavengers, a circulating water rig was constructed. The rig uses a demineralized water supply as a source of make-up water to fill a recirculating loop of approx. 10 litres volume. The rig pipework is made of polythene with standard off-the shelf pipe fittings and connectors. The following parameters can be measured within the rig: pH and conductivity measured by in-line monitor, dissolved oxygen level, temperature. The system has already been used for some preliminary testing. The following oxygen scavengers have been used for tests: ascorbic acid (vitamin C), N,N-diethyl-hydroxylamine (DEHA), Hydroquinone, hydrazine hydrate and anhydrous sodium sulfite. (authors)

  1. Development of a low cost test rig for standalone WECS subject to electrical faults.

    Science.gov (United States)

    Himani; Dahiya, Ratna

    2016-11-01

    In this paper, a contribution to the development of low-cost wind turbine (WT) test rig for stator fault diagnosis of wind turbine generator is proposed. The test rig is developed using a 2.5kW, 1750 RPM DC motor coupled to a 1.5kW, 1500 RPM self-excited induction generator interfaced with a WT mathematical model in LabVIEW. The performance of the test rig is benchmarked with already proven wind turbine test rigs. In order to detect the stator faults using non-stationary signals in self-excited induction generator, an online fault diagnostic technique of DWT-based multi-resolution analysis is proposed. It has been experimentally proven that for varying wind conditions wavelet decomposition allows good differentiation between faulty and healthy conditions leading to an effective diagnostic procedure for wind turbine condition monitoring. Copyright © 2016 ISA. Published by Elsevier Ltd. All rights reserved.

  2. The evaluation of secondary system oxygen-scavenging chemicals using a water-circulating rig

    International Nuclear Information System (INIS)

    Collins, M.W.

    2002-01-01

    To assess the efficiency, mode of action and possible by-products of chemical dosing agents, e.g. oxygen scavengers, a circulating water rig was constructed. The rig uses a demineralized water supply as a source of make-up water to fill a recirculating loop of approx. 10 litres volume. The rig pipework is made of polythene with standard off-the shelf pipe fittings and connectors. The following parameters can be measured within the rig: pH and conductivity measured by in-line monitor, dissolved oxygen level, temperature. The system has already been used for some preliminary testing. The following oxygen scavengers have been used for tests: ascorbic acid (vitamin C), N,N-diethyl-hydroxylamine (DEHA), Hydroquinone, hydrazine hydrate and anhydrous sodium sulfite. (authors)

  3. BioKonversion technology recovers, remediates and reuses waste and hydrocarbons from oil drilling

    Energy Technology Data Exchange (ETDEWEB)

    Topf, A.

    2008-01-15

    Houston-based Nopal Group has developed a solution to dispose of oilfield waste in a safe and cost-effective manner. The company is actively engaged in a large-scale project to remediate a 400-hectare site on the Aspheron Peninsula in Azerbaijan. The site is currently regarded as the most polluted place in the world after a century of oil extraction with little regard for the surrounding environment. The Nopal Group will use its patented BioKonversion technology, which cleanses the soil of hydrocarbons in a two-part process using a large machine known as the Green Machine. Several pipelines will need to be relocated, and ancient drilling rigs that have been there as long as 100 years will have to be dealt with. The cleanup cost has been estimated at between $20 million to $40 million, and will take between 18 and 36 months, depending on how deep into the ground the machines have to dig for hydrocarbons. The 90-foot by 40-foot machine processes drill cuttings, contaminated soil and drill fluids by first separating the dirt from the liquid hydrocarbons, which can be recycled or refined for resale. The remaining dirt, which still contains 3 to 7 percent oil, is then placed into a centrifuge and mixed with a heating agent and other elements, including naturally oleophilic kenaf powder. The process micronizes and absorbs hydrocarbons. Once the process is finished, the hydrocarbons are immediately non-detectable and non-leachable. The leftover benign dirt can be used as landfill cover, or mixed with road aggregate. BioKonversion can also be adapted for use on oil rigs. This article demonstrated that the process has clear advantages over traditional oilfield remediation methods such as land farming. Opportunities exist to utilize the process in Venezuela and Kuwait. 1 fig.

  4. Core drilling of deep borehole OL-KR3B at Olkiluoto in Eurajoki 2005

    Energy Technology Data Exchange (ETDEWEB)

    Rautio, T. [Suomen Malmi Oy, Espoo (Finland)

    2005-10-15

    Posiva Oy submitted an application for the Decision in Principle to the Finnish Government in May 1999. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the Decision in Principle on the final disposal facility for spent nuclear fuel at Olkiluoto, Eurajoki in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 530.60 m deep borehole with a diameter of 75.7 mm at Olkiluoto in summer 2005. This borehole was aimed to get additional information of the quality of bedrock in the area, where a new shaft with a diameter of 3 m is planned to be located. The identification number of the borehole is OL-KR38. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded information about drilling parameters. The objective of these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The volume of the used drilling water was about 473m{sup 3} and the measured volume of the returning water was about 38m{sup 3} in borehole OL-KR38. The deviation of the borehole was measured with the deviation measuring instruments EMS and Devitool Peewee. The results of the EMS measurements indicate that borehole OL-KR38 deviates 1.02 m south and 0.58 m west from the target point at the borehole depth of 525 m. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength is about 106

  5. Core drilling of deep borehole OL-KR34 at Olkiluoto in Eurajoki 2005

    Energy Technology Data Exchange (ETDEWEB)

    Rautio, T. [Suomen Malmi Oy, Espoo (Finland)

    2005-07-15

    Posiva Oy submitted an application for the Decision in Principle to the Finnish Government in May 1999. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the Decision in Principle on the final disposal facility for spent nuclear fuel at Olkiluoto, Eurajoki in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 100.07 m deep borehole with a diameter of 75.7 mm at Olkiluoto in April 2005. This borehole was aimed to get additional information of the quality of bedrock and the anomalous part of the bedrock and quality and the location of the fractured zones R19A and R19B. The identification number of the borehole is OL-KR34. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded information about drilling parameters. The objective of all measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The volume of the used drilling water was about 37m{sup 3} and the measured volume of the returning water was about 18m{sup 3} in borehole OL-KR34. The deviation of the borehole was measured with the deviation measuring instruments EMS and Maxibor. The results of the Maxibor measurements indicate that borehole OLKR34 deviates 0.84 m right and 0.15 m up at the borehole depth of 99 m. Uniaxial compressive strength, Young's Modulus and Poisson' s ratio were measured from the core samples. The average uniaxial compressive strength is about 142 MPa, the

  6. Core drilling of deep borehole OL-KR36 at Olkiluoto in Eurajoki 2005

    Energy Technology Data Exchange (ETDEWEB)

    Niinimaeki, R.; Rautio, T. [Suomen Malmi Oy, Espoo (Finland)

    2005-07-15

    Posiva Oy submitted an application for the Decision in Principle to the Finnish Government in May 1999. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the Decision in Principle on the final disposal facility for spent nuclear fuel at Olkiluoto, Eurajoki in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 205.17 m deep borehole with a diameter of 75.7 mm at Olkiluoto in May 2005. This borehole was aimed to get additional information of the quality of bedrock and the anomalous part of the bedrock and quality and the location of the fractured zones R19A and R19B. The identification number of the borehole is OL-KR36. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded information about drilling measurements. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The volume of the used drilling water was about 117 m{sup 3} and the measured volume of the returning water was about 51m{sup 3} in borehole OL-KR36. The deviation of the borehole was measured with the deviation measuring instruments EMS and Maxibor. The results of the Maxibor measurements indicate that borehole OL-KR36 deviates 10.34 m left and 7.11 m up at the borehole depth of 204 m. Uniaxial compressive strength, Young's Modulus and Poisson' s ratio were measured from the core samples. The average uniaxial compressive strength is about 126

  7. Core drilling of deep borehole OL-KR35 at Olkiluoto in Eurajoki 2005

    Energy Technology Data Exchange (ETDEWEB)

    Rautio, T. [Suomen Malmi Oy, Espoo (Finland)

    2005-07-15

    Posiva Oy submitted an application for the Decision in Principle to the Finnish Government in May 1999. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the Decision in Principle on the final disposal facility for spent nuclear fuel at Olkiluoto, Eurajoki in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 100.87 m deep borehole with a diameter of 75.7 mm at Olkiluoto in May 2005. This borehole was aimed to get additional information of the quality of bedrock and the anomalous part of the bedrock and quality and the location of the fractured zones R19A and R19B. The identification number of the borehole is OL-KR35. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded information about drilling parameters. The objective of all measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The volume of the used drilling water was about 53 m{sup 3} and the measured volume of the returning water was about 25 m{sup 3} in borehole OL-KR35. The deviation of the borehole was measured with the deviation measuring instruments EMS and Maxibor. The results of the Maxibor measurements indicate that borehole OL-KR35 deviates 0.49 m right and 0.30 m up at the borehole depth of 99 m. Uniaxial compressive strength, Young's Modulus and Poisson' s ratio were measured from the core samples. The average uniaxial compressive strength is about 90 MPa, the

  8. Core drilling of deep drillhole OL-KR48 at Olkiluoto in Eurajoki 2007

    International Nuclear Information System (INIS)

    Toropainen, V.

    2008-01-01

    Posiva Oy submitted an application for the Decision in Principle to the Finnish Government in May 1999. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the Decision in Principle on the final disposal facility for spent nuclear fuel at Olkiluoto, Eurajoki in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 530.11 m deep drillhole (identification number OL-KR48) with a diameter of 75.7 mm at Olkiluoto in summer 2007. This drillhole was aimed to get additional information of the quality of bedrock in the area, where a new shaft with a diameter of 3.5 m is planned. The drillhole is nearly vertical, and its deviation was minimized with directional drilling. The drillhole requires cleaning and stabilization for down the hole measurements. To obtain more information about bedrock and groundwater properties, a set of monitoring measurements and samplings from the drilling and returning water was carried out during. Both the volume and the electric conductivity of the returning and drilling waters were recorded. The drill rig was computer controlled and recorded drilling parameters. Sodium fluorescein was used as a label agent in the drilling water. The total volume of the used drilling and washing water was 438 m 3 . Measured volume of the returning water was 123 m 3 . The deviation of the drillhole was measured with the deviation measuring instruments DeviTool and EMS. The results of the EMS measurements indicate that the drillhole deviates 2.51 m north and 0.51 m west from the target point at the drillhole depth of 528 m. Results of DeviTool indicate deviation of 1.44 m north and 0.40 m west at depth of 530 m. Uniaxial compressive strength (113.0 Mpa), Young's Modulus (36.2 GPa) and

  9. Core drilling of deep drillhole OL-KR57 at Olkiluoto in Eurajoki 2011-2012

    Energy Technology Data Exchange (ETDEWEB)

    Toropainen, V. [Suomen Malmi Oy, Espoo (Finland)

    2012-07-15

    As a part of the confirming site investigations at Olkiluoto, Suomen Malmi Oy (Smoy) core drilled 401.71 m and 45.01 m deep drillholes, OL-KR57 and OL-KR57B, at Olkiluoto in September 2011 - January 2012. The diameter of the drillholes is 75.7 mm. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the returning and drilling water were recorded. The drill rig was computer controlled and the computer recorded drilling parameters during drilling. The objective of the measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling, flushing and washing water were 350 m3 and 30 m3 in the drillholes OL-KR57 and OL-KR57B, respectively. The measured volumes of the returning water in the drillholes were 328 m{sup 3} and 16.8 m{sup 3}, respectively. The deviations of the drillholes were measured with the deviation measuring instruments EMS and Gyro. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength was 123.9 MPa, the average Young's Modulus was 42.6 GPa and the average Poisson's ratio was 0.23. The main rock types are veined and diatexitic gneisses, mica gneiss and tonaliticgranodioritic- granitic gneiss. The average fracture frequency is 2.5 pcs/m in drillhole OL-KR57 and 3.3 pcs/m in the drillhole OL-KR57B. The average RQD values are 95.0 % and 93.0 %. Seven separate fractured zones were interpreted from OL-KR57 and three fractured zones from OL-KR57B. (orig.)

  10. Results of an adaptive environmental assessment modeling workshop concerning potential impacts of drilling muds and cuttings on the marine environment

    Science.gov (United States)

    Auble, Gregor T.; Andrews, Austin K.; Ellison, Richard A.; Hamilton, David B.; Johnson, Richard A.; Roelle, James E.; Marmorek, David R.

    1983-01-01

    Drilling fluids or "muds" are essential components of modern drilling operations. They provide integrity for the well bore, a medium for removal of formation cuttings, and lubrication and cooling of the drill bit and pipe. The modeling workshop described in this report was conducted September 14-18, 1981 in Gulf Breeze, Florida to consider potential impacts of discharged drilling muds and cuttings on the marine environment. The broad goals of the workshop were synthesis of information on fate and effects, identification of general relationships between drilling fluids and the marine environment, and identification of site-specific variables likely to determine impacts of drilling muds and cuttings in various marine sites. The workshop was structured around construction of a model simulating fate and effects of discharges from a single rig into open water areas of the Gulf of Mexico, and discussion of factors that might produce different fate and effects in enclosed areas such as bays and estuaries. The simulation model was composed of four connected submodels. A Discharge/Fate submodel dealt with the discharge characteristics of the rig and the subsequent fate of discharged material. Three effects submodels then calculated biological responses at distances away from the rig for the water column, soft bottom benthos (assuming the rig was located over a soft bottom environment), and hard bottom benthos (assuming the rig was located over a hard bottom environment). The model focused on direct linkages between the discharge and various organisms rather than on how the marine ecosystem itself is interconnected. Behavior of the simulation model indicated relatively localized effects of drilling muds and cuttings discharged from a single platform into open water areas. Water column fate and effects were dominated by rapid dilution. Effects from deposition of spent mud and cuttings were spatially limited with relatively rapid recovery, especially in soft bottom benthic

  11. Active Suppression of Drilling System Vibrations For Deep Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Raymond, David W.; Blankenship, Douglas A.; Buerger, Stephen; Mesh, Mikhail; Radigan, William Thomas; Su, Jiann-Cherng

    2015-10-01

    The dynamic stability of deep drillstrings is challenged by an inability to impart controllability with ever-changing conditions introduced by geology, depth, structural dynamic properties and operating conditions. A multi-organizational LDRD project team at Sandia National Laboratories successfully demonstrated advanced technologies for mitigating drillstring vibrations to improve the reliability of drilling systems used for construction of deep, high-value wells. Using computational modeling and dynamic substructuring techniques, the benefit of controllable actuators at discrete locations in the drillstring is determined. Prototype downhole tools were developed and evaluated in laboratory test fixtures simulating the structural dynamic response of a deep drillstring. A laboratory-based drilling applicability demonstration was conducted to demonstrate the benefit available from deployment of an autonomous, downhole tool with self-actuation capabilities in response to the dynamic response of the host drillstring. A concept is presented for a prototype drilling tool based upon the technical advances. The technology described herein is the subject of U.S. Patent Application No. 62219481, entitled "DRILLING SYSTEM VIBRATION SUPPRESSION SYSTEMS AND METHODS", filed September 16, 2015.

  12. A new NMR measuring instrument for logging while drilling; Ein neues Logging While Drilling Kernspinresonanz-Messgeraet

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, D.M.; Thern, H.F.; Kruspe, T.; Blanz, M. [Baker Hughes INTEQ GmbH, Celle (Germany); Strobel, J. [RWE Dea AG, Hamburg (Germany)

    2003-07-01

    Since 1990, commercial wireline MR measurements are carried out in boreholes. Logging while drilling is a comparatively new technique, in which a MR sensor is integrated in the drilling equipment so that the measured data are available more quickly. Problems may be caused by movement of the drilling rig. The resulting vibrations may distort the MR signal. Current development activities therefore focus on design optimization for higher vibration stability. The contribution explains vibration-induced wrong measuring signals and presents measures to reduce the effects of vibration. Further, a new LWD-MR measuring instrument is presented, the so-called MagTrak{sup TM} which combines the quality and advantages of cable MR-T{sub 2} measurements with a minimum of vibration effects, as is shown by MR data from a commercial borehole. [German] Seit 1990 werden Wireline-MR-Messungen kommerziell im Bohrloch durchgefuehrt. In den letzten Jahren wird an Messgeraeten gearbeitet, die bereits waehrend des Bohrens MR-Daten aufzeichnen (Logging While Drilling, LWD). Dazu wird ein MR-Sensor in den Bohrstrang integriert. Neben der schnelleren Verfuegbarkeit der MR-Daten besteht ein grosser Vorteil der LWD-MR-Messung darin, dass die Daten bereits kurz nach dem Bohren gemessen werden. Die Invasion von Bohrlochspuelung in die Formation dauert dann noch nicht lange an, und die MR-Messung findet im relativ unveraenderten Gestein statt. Probleme beim Einsatz von MR-Messgeraeten waehrend des Bohrens werden vor allem durch die Bewegungen des Bohrstranges verursacht. Vibrationen des MR-Sensors fuehren zu veraenderten Messbedingungen waehrend des Messvorgangs, was zu Verzerrungen im MR-Signal fuehren kann. Den Aufbau des Messgeraetes so zu optimieren, dass Vibrationen einen moeglichst kleinen Einfluss auf die Messung haben, ist ein aktuelles Ziel der heutigen LWD-MR-Entwicklung. In diesem Artikel werden vibrationsverursachte Signalfehler erklaert und Massnahmen genannt, die die

  13. Evaluation of using cyclocranes to support drilling and production of oil and gas in wetland areas. Fifth quarterly technical progress report, Third quarter, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Eggington, W.J.

    1993-12-31

    The planned program falls under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. The cyclocraft is a proven hybrid aircraft that utilizes aerostatic and aerodynamic lift. This type of aircraft has considerable payload capacity, VTOL capability, high controllability, low operating cost, low downwash and high safety. The benefits of using a cyclocraft to transport drill rigs and materials over environmentally-sensitive surfaces would be significant. The cyclocraft has considerable cost and operational advantages over the helicopter. In 1992, Task 1, Environmental Considerations, and Task 2, Transport Requirements, were completed. In the first two quarters of 1993, Task 3, Parametric Analysis, Task 4, Preliminary Design, and Task 6, Ground Support, were completed. Individual reports containing results obtained from each of these tasks were submitted to DOE. In addition, through June 30, 1993, a Subscale Test Plan was prepared under Task 5, Subscale Tests, and work was initiated on Task 7, Environmental Impacts, Task 8, Development Plan, Task 9, Operating Costs, and Task 10, Technology Transfer.

  14. Evaluation of using cyclocranes to support drilling and production of oil and gas in wetland areas. Third quarterly technical progress report, First quarter, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Eggington, W.J.

    1993-06-01

    The planned program falls under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. The cyclocraft is a proven hybrid aircraft that utilizes aerostatic and aerodynamic lift. This type of aircraft has considerable payload capacity, VTOL capability, high controllability, low operating cost, low downwash and high safety. The benefits of using a cyclocraft to transport drill rigs and materials over environmentally-sensitive surfaces would be significant. The cyclocraft has considerable cost and operational advantages over the helicopter. The major activity during the report period was focussed on Task 4, Preliminary Design. The selected design has been designated H.1 Cyclocraft by MRC. The preliminary design work was based on the results of the three preceding tasks. A report was initiated that contains descriptions of the H.1 Cyclocraft and its subsystems; options available for the final aircraft design process; performance, geometry, weights and power data; logistics and considerations relating to cyclocraft operations in wetlands.

  15. Evaluation of using cyclocranes to support drilling and production of oil and gas in wetland areas. Fourth quarterly technical progress report, Second quarter, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Eggington, W.J.

    1993-09-01

    The planned program falls under wetlands area research related to drilling, production, and transportation of oil and gas resources. Specifically the planned program addresses an evaluation of using cyclocraft to transport drill rigs, mud, pipes and other materials and equipment in a cost effective and environmentally safe manner to support oil and gas drilling and production operations in wetland areas. The cyclocraft is a proven hybrid aircraft that utilizes aerostatic and aerodynamic lift. This type of aircraft has considerable payload capacity, VTOL capability, high controllability, low operating cost, low downwash and high safety. The benefits of using a cyclocraft to transport drill rigs and materials over environmentally-sensitive surfaces would be significant. The cyclocraft has considerable cost and operational advantages over the helicopter. The major activity during the second quarter of 1993 was focussed on completion of Task 4, Preliminary Design. The selected design has been designated H.1 Cyclocraft by MRC. Also during the report period, Task 6, Ground Support, was completed and a report containing the results was submitted to DOE. This task addressed the complete H.1 Cyclocraft system, i.e. it included the need personnel, facilities and equipment to support cyclocraft operations in wetland areas.

  16. RIG-1 expression is associated with sexual malfunctions of female type 2 diabetic patients

    Directory of Open Access Journals (Sweden)

    Batool Hajebrahimi

    2017-03-01

    Full Text Available Introduction: The patients with type 2 diabetes (T2D suffer from the malfunctions of the sexual behaviors, and several mechanisms have been proposed to describe these disorders. The innate immunity may be involved in the malfunctions of T2D patients. Melanoma differentiation-associated protein 5 (MDA5 and retinoic acid (RA-inducible gene 1 (RIG-1, as the innate immunity receptors, are the responsible molecules for the activation of some intracellular signaling pathways and the induction of inflammation. Thus, this study aimed to examine the molecules which may participate in the induction/stimulation of sexual malfunctions in the female T2D patients. Methods: Sexual functions were evaluated in 41 female T2D patients using the Female Sexual Function Index (FSFI questionnaire. Real-time polymerase chain reaction (PCR technique was used to quantify MDA5 and RIG-1 mRNA levels. Results: Results showed that increased RIG-1 mRNA levels were significantly associated with the bad orgasm in the female T2D patients compared to the female patients with good orgasm. Expression of RIG-1 and MDA5 levels were not associated with other sexual functions’ criteria. Conclusion: The findings of this study demonstrated that bad orgasm is associated with the increased RIG-1 expression. Consequently, the correlation between inflammation and bad orgasm in a RIG-1 dependent manner is suggested.

  17. Additive to clay drilling muds

    Energy Technology Data Exchange (ETDEWEB)

    Voytenko, V.S.; Nekrasova, V.B.; Nikitinskiy, E.L.; Ponomarev, V.N.

    1984-01-01

    The purpose of the invention is to improve the lubricating and strengthening properties of clay drilling muds. This goal is achieved because the lubricating and strengthening additive used is waste from the pulp and paper industry at the stage of reprocessing crude sulfate soap into phytosterol.

  18. Drilling azimuth gamma embedded design

    Directory of Open Access Journals (Sweden)

    Zhou Yi Ren

    2016-01-01

    Full Text Available Embedded drilling azimuth gamma design, the use of radioactive measuring principle embedded gamma measurement while drilling a short section analysis. Monte Carlo method, in response to the density of horizontal well logging numerical simulation of 16 orientation, the orientation of horizontal well analysed, calliper, bed boundary location, space, different formation density, formation thickness, and other factors inclined strata dip the impact by simulating 137Cs sources under different formation conditions of the gamma distribution, to determine the orientation of drilling density tool can detect window size and space, draw depth of the logging methods. The data 360° azimuth imaging, image processing method to obtain graph, display density of the formation, dip and strata thickness and other parameters, the logging methods obtain real-time geo-steering. To establish a theoretical basis for the orientation density logging while drilling method implementation and application of numerical simulation in-depth study of the MWD azimuth and density log response factors of horizontal wells.

  19. Development of controlled drilling system

    International Nuclear Information System (INIS)

    Kiho, Kenzo; Miyakawa, Kimio; Suzuki, Koichi; Sunaga, Takayuki

    2008-01-01

    In Japan, the soft sedimentary rock of the Neogene tertiary is being focused as a host rock for the High Level Radioactive Waste (HLW) disposal. Especially, the soft sedimentary rock at the offshore, region is thought to be one of the best candidates, since there is no driving force of the underground water. The measurement and logging in the bore hole in order to check the hydro-geological and geomechanical conditions of the host rock is a very important way to examine the potentially of the disposal candidates. The CRIEPI (Central Research Institute of Electric Power Industry) has been conducting the project about the controlled drilling technology and the measurement and logging technologies in its borehole. In 2000, as the beginning year of the project, we made the conceptual design of the drilling and measuring systems, and made key tools concerning each technology on an experimental basis. We have been developing sub tools constructing drilling and measuring systems since 2000, and applying these systems to the Horonobe site recent 5 years. We will briefly report the outline of the system and the results of drilling and measurement that were carried out at the Horonobe site. (author)

  20. DM Considerations for Deep Drilling

    OpenAIRE

    Dubois-Felsmann, Gregory

    2016-01-01

    An outline of the current situation regarding the DM plans for the Deep Drilling surveys and an invitation to the community to provide feedback on what they would like to see included in the data processing and visualization of these surveys.

  1. Drill machine guidance using natural occurring radiation

    International Nuclear Information System (INIS)

    Dahl, H.D.; Schroeder, R.L.; Williams, B.J.

    1980-01-01

    A drilling machine guidance system is described which uses only the naturally occuring radiation within the seam or stratum of interest. The apparatus can be used for guiding horizontal drilling machines through coal seams and the like. (U.K.)

  2. Economic environmental management of drilling operations

    International Nuclear Information System (INIS)

    Longwell, H.J.; Akers, T.J.

    1992-01-01

    This paper presents significant environmental and regulatory initiatives developed by Exxon's New Orleans Drilling Organization. Specifically, the paper will cover drilling waste minimization techniques and disposal options, recycling of drilling waste streams, and environmentally managed drilling location design considerations. The implementation of some of these initiatives at Exxon's Chalkley field land locations have resulted in a fifty percent reduction in drilling location waste management costs. Some of these same initiatives have been successfully applied to Exxon's barge drilling locations. For operations at the environmentally sensitive Mobile Bay, Exxon contracted with a local company and assisted in the development of an economically and environmentally superior drilling waste disposal and treatment system. In summary, it is possible for drilling operators to pro-actively manage escalating environmental and regulatory challenges through the implementation of economic and practical initiatives

  3. Heat accumulation during sequential cortical bone drilling.

    Science.gov (United States)

    Palmisano, Andrew C; Tai, Bruce L; Belmont, Barry; Irwin, Todd A; Shih, Albert; Holmes, James R

    2016-03-01

    Significant research exists regarding heat production during single-hole bone drilling. No published data exist regarding repetitive sequential drilling. This study elucidates the phenomenon of heat accumulation for sequential drilling with both Kirschner wires (K wires) and standard two-flute twist drills. It was hypothesized that cumulative heat would result in a higher temperature with each subsequent drill pass. Nine holes in a 3 × 3 array were drilled sequentially on moistened cadaveric tibia bone kept at body temperature (about 37 °C). Four thermocouples were placed at the center of four adjacent holes and 2 mm below the surface. A battery-driven hand drill guided by a servo-controlled motion system was used. Six samples were drilled with each tool (2.0 mm K wire and 2.0 and 2.5 mm standard drills). K wire drilling increased temperature from 5 °C at the first hole to 20 °C at holes 6 through 9. A similar trend was found in standard drills with less significant increments. The maximum temperatures of both tools increased from drill sizes was found to be insignificant (P > 0.05). In conclusion, heat accumulated during sequential drilling, with size difference being insignificant. K wire produced more heat than its twist-drill counterparts. This study has demonstrated the heat accumulation phenomenon and its significant effect on temperature. Maximizing the drilling field and reducing the number of drill passes may decrease bone injury. © 2015 Orthopaedic Research Society. Published by Wiley Periodicals, Inc.

  4. Drill cuttings mount formation study

    Science.gov (United States)

    Teh, Su Yean; Koh, Hock Lye

    2014-07-01

    Oil, Gas and Energy sector has been identified as an essential driving force in the Malaysian Economic Transformation Programs (ETP). Recently confirmed discovery of many offshore oil and gas deposits in Malaysian waters has ignited new confidence in this sector. However, this has also spurred intense interest on safeguarding the health and environment of coastal waters in Malaysia from adverse impact resulting from offshore oil and gas production operation. Offshore discharge of spent drilling mud and rock cuttings is the least expensive and simplest option to dispose of large volumes of drilling wastes. But this onsite offshore disposal may have adverse environmental impacts on the water column and the seabed. It may also pose occupational health hazards to the workers living in the offshore platforms. It is therefore important to model the transport and deposition of drilling mud and rock cuttings in the sea to enable proper assessment of their adverse impacts on the environment and the workers. Further, accumulation of drill particles on the seabed may impede proper operation of pipelines on the seabed. In this paper, we present an in-house application model TUNA-PT developed to cater to local oil and gas industry needs to simulate the dispersion and mount formation of drill cuttings by offshore oil and gas exploration and production platforms. Using available data on Malaysian coastal waters, simulation analyses project a pile formation on the seabed with a maximum height of about 1 m and pile radius of around 30 to 50 m. Simulated pile heights are not sensitive to the heights of release of the cuttings as the sensitivity has been mitigated by the depth of water.

  5. More fleet adjustments seen needed for drilling industry

    International Nuclear Information System (INIS)

    Lundy, K.

    1992-01-01

    The Canadian oil and gas industry has been in a mode of restructuring since the late 1980s as it became increasingly apparent that the natural gas boom which was to replace activity previously generated by high oil process was not going to materialize. This paper reports that the production companies operating in Canada are concentrating on rationalization of land holdings and corporate downsizing and realignment rather than exploration and development of petroleum resources. Not surprisingly, this has resulted in a substantial downturn of the contract drilling and well servicing sectors in both western Canada, where the majority (95%) of the industry activity takes place, and in the frontier and East Coast offshore arenas. The persistently low levels of utilization throughout this period and prior to the Organization of Petroleum Exporting Countries price shocks in the '70s illustrate that the high levels achieved in the late '70s and early '80s were an aberration. The rig fleet, which was expanded to meet this abnormally high demand, must continue to rationalize if profitability is to return on an on an industrywide basis

  6. Effects of a Short Drilling Implant Protocol on Osteotomy Site Temperature and Drill Torque.

    Science.gov (United States)

    Mihali, Sorin G; Canjau, Silvana; Cernescu, Anghel; Bortun, Cristina M; Wang, Hom-Lay; Bratu, Emanuel

    2018-02-01

    To establish a protocol for reducing the drilling sequence during implant site preparation based on temperature and insertion torque. The traditional conventional drilling sequence (used several drills with 0.6-mm increment each time) was compared with the proposed short drilling protocol (only used 2 drills: initial and final drill). One hundred drilling osteotomies were performed in bovine and porcine bones. Sets of 2 osteotomy sites were created in 5 bone densities using 2 types of drilling protocols. Thermographic pictures were captured throughout all drilling procedures and analyzed using ThermaCAM Researcher Professional 2.10. Torque values were determined during drilling by measuring electrical input and drill speed. There were statistically significant differences in bone temperature between the conventional and short drilling protocols during implant site preparation (analysis of variance P = 0.0008). However, there were no significant differences between the 2 types of drilling protocols for both implant diameters. Implant site preparation time was significantly reduced when using the short drilling protocol compared with the conventional drilling protocol (P drilling protocol proposed herein may represent a safe approach for implant site preparation.

  7. Surgical drill system and surgical drill bit to be used therein

    NARCIS (Netherlands)

    Margallo Balbas, E.; Wieringa, P.A.; French, P.J.; Lee, R.A.; Breedveld, P.

    2007-01-01

    Surgical drill system comprising a mechanical drill bit and means for imaging the vicinity of the drill bit tip, said means comprising: at least one optical fiber having a distal end and a proximal end, said distal end being located adjacent said drill bit tip, an optical processing unit, said

  8. 25 CFR 226.33 - Line drilling.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Line drilling. 226.33 Section 226.33 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS LEASING OF OSAGE RESERVATION LANDS FOR OIL AND GAS MINING Requirements of Lessees § 226.33 Line drilling. Lessee shall not drill within 300 feet...

  9. 30 CFR 256.71 - Directional drilling.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Directional drilling. 256.71 Section 256.71... drilling. In accordance with an approved exploration plan or development and production plan, a lease may be maintained in force by directional wells drilled under the leased area from surface locations on...

  10. Drilling of bone: A comprehensive review

    Science.gov (United States)

    Pandey, Rupesh Kumar; Panda, S.S.

    2013-01-01

    Background Bone fracture treatment usually involves restoring of the fractured parts to their initial position and immobilizing them until the healing takes place. Drilling of bone is common to produce hole for screw insertion to fix the fractured parts for immobilization. Orthopaedic drilling during surgical process causes increase in the bone temperature and forces which can cause osteonecrosis reducing the stability and strength of the fixation. Methods A comprehensive review of all the relevant investigations carried on bone drilling is conducted. The experimental method used, results obtained and the conclusions made by the various researchers are described and compared. Result Review suggests that the further improvement in the area of bone drilling is possible. The systematic review identified several consequential factors (drilling parameters and drill specifications) affecting bone drilling on which there no general agreement among investigators or are not adequately evaluated. These factors are highlighted and use of more advanced methods of drilling is accentuated. The use of more precise experimental set up which resembles the actual situation and the development of automated bone drilling system to minimize human error is addressed. Conclusion In this review, an attempt has been made to systematically organize the research investigations conducted on bone drilling. Methods of treatment of bone fracture, studies on the determination of the threshold for thermal osteonecrosis, studies on the parameters influencing bone drilling and methods of the temperature measurement used are reviewed and the future work for the further improvement of bone drilling process is highlighted. PMID:26403771

  11. 30 CFR 250.1605 - Drilling requirements.

    Science.gov (United States)

    2010-07-01

    ... deposit. (2) Inclinational surveys shall be obtained on all vertical wells at intervals not exceeding 1... to that leaseholder. (f) Fixed drilling platforms. Applications for installation of fixed drilling... removed or have been otherwise immobilized are classified as fixed bottom founded drilling platforms. (g...

  12. Development of vertical drilling apparatus (Terra-Drill); Entwicklung eines Vertikal-Bohrgeraets (Terra-Drill) - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Jenne, D.

    2009-05-15

    This well-illustrated final report for the Swiss Federal Office of Energy (SFOE) reports on the development of a vertical drilling apparatus named Terra-Drill. The various stages of the development of the apparatus, which is based on earlier designs, is discussed. New norms issued in Germany for the size of boreholes for buried vertical heat-exchangers and the appropriate linings to be used are discussed. The new Terra Drill 4407 V drilling apparatus and its testing are discussed. The drill is quoted as being particularly suitable for cramped locations. Technical details are presented and a comprehensive collection of photographs is included. Various preliminary reports and development documentation are included.

  13. Study on drilling induced delamination of woven kenaf fiber reinforced epoxy composite using carbide drills

    Science.gov (United States)

    Suhaily, M.; Hassan, C. H. Che; Jaharah, A. G.; Azmi, H.; Afifah, M. A.; Khairusshima, M. K. Nor

    2018-04-01

    In this research study, it presents the influences of drilling parameters on the delamination factor during the drilling of woven kenaf fiber reinforced epoxy composite laminates when using the carbide drill bits. The purpose of this study is to investigate the influence of drilling parameters such as cutting speed, feed rate and drill sizes on the delamination produced when drilling woven kenaf reinforced epoxy composite using the non-coated carbide drill bits. The damage generated on the woven kenaf reinforced epoxy composite laminates were observed both at the entrance and exit surface during the drilling operation. The experiments were conducted according to the Box Behnken experimental designs. The results indicated that the drill diameter has a significant influence on the delamination when drilling the woven kenaf fiber reinforced epoxy composites.

  14. A drilling mud for drilling wells in collapsing rocks

    Energy Technology Data Exchange (ETDEWEB)

    Bochkarev, G P; Anderson, B A; Minkhayrov, K A; Sharipov, A U

    1982-01-01

    In a known drilling mud for drilling wells in collapsing rocks, which contains clay, sodium silicate and polyacrylamide (PAA), in order to increase its specific electrical resistance and to increase the strengthening properties, a silicoorganic liquid is additionally introduced into its composition with the following component ratio (percent): clay, 5 to 7; sodium silicate, 5 to 7; polyacrylamide, 0.3 to 0.5; silicoorganic liquid, GKZh-94, 0.5 to 1.5 and water, the remainder. The GKZh-94 is a chemical compound based on alkylphenylchlorsilanes and substituted ethers of orthosilicic acid, used for waterproofing fabrics and soils. The addition of GKZh-94 provides the required values of the specific electric resistance of the mud and does not distort the gas logging indications. The proposed mud has low water production (4 to 6 cubic centimeters), optimal viscosity (25 to 31 seconds) and high structural and mechanical properties. Its strengthening properties are substantially above those of the known mud.

  15. Selection of large diameter drills with the aid of a computer, between diesel and electric alternatives for sedimentary mining. Seleccion de perforadoras de gran diametro con ayuda de ordenador, alternativa diesel electrica en mineria sedimentaria

    Energy Technology Data Exchange (ETDEWEB)

    Colomo Gomez, M. (ENCASUR, Ciudad Real (Spain))

    1988-01-01

    The communication develops a rotary drill rig selection study carried out in Mina Emma, ENCASUR Puertollano (Open pit coal mine), for diameters extended from 9 7/8 to 15 inches and bench heights 10, 15 and 20 meters. Since the choice of diameters is in the transition area from diesel to electric machines, the conclusions are specially interesting in making buying decisions of this kind. 6 figs., 6 tabs.

  16. Automatic real time drilling support on Ekofisk utilizing eDrilling

    Energy Technology Data Exchange (ETDEWEB)

    Rommetveit, Rolv; Bjorkevoll, Knut S.; Halsey, George W.; Kluge, Roald; Molde, Dag Ove; Odegard, Sven Inge [SINTEF Petroleum Research, Trondheim (Norway); Herbert, Mike [HITEC Products Drilling, Stavanger (Norway); ConocoPhillips Norge, Stavanger (Norway)

    2008-07-01

    eDrilling is a new and innovative system for real time drilling simulation, 3D visualization and control from a remote drilling expert centre. The concept uses all available real time drilling data (surface and downhole) in combination with real time modelling to monitor and optimize the drilling process. This information is used to visualize the wellbore in 3D in real time. eDrilling has been implemented in an Onshore Drilling Center in Norway. The system is composed of the following elements, some of which are unique and ground-breaking: an advanced and fast Integrated Drilling Simulator which is capable to model the different drilling sub-processes dynamically, and also the interaction between these sub-processes in real time; automatic quality check and corrections of drilling data; making them suitable for processing by computer models; real time supervision methodology for the drilling process using time based drilling data as well as drilling models / the integrated drilling simulator; methodology for diagnosis of the drilling state and conditions. This is obtained from comparing model predictions with measured data. Advisory technology for more optimal drilling. A Virtual Wellbore, with advanced visualization of the downhole process. Dat low and computer infrastructure. e-Drilling has been implemented in an Onshore Drilling Center on Ekofisk in Norway. The system is being used on drilling operations, and experiences from its use are presented. The supervision and diagnosis functionalities have been useful in particular, as the system has given early warnings on ECD and friction related problems. This paper will present the eDrilling system as well as experiences from its use. (author)

  17. Electric drill-string telemetry

    CERN Document Server

    Carcione, J M

    2003-01-01

    We design a numerical algorithm for simulation of low-frequency electric-signal transmission through a drill string. This is represented by a transmission line with varying geometrical and electromagnetic properties versus depth, depending on the characteristics of the drill-string/formation system. These properties are implicitly modeled by the series impedance and the shunt admittance of the transmission line. The differential equations are parabolic, since at low frequencies the wave field is diffusive. We use an explicit scheme for the solution of parabolic problems, based on a Chebyshev expansion of the evolution operator and the Fourier pseudospectral method to compute the spatial derivatives. The results are verified by comparison to analytical solutions obtained for the initial-value problem with a voltage source.

  18. Chemical Speciation of Chromium in Drilling Muds

    International Nuclear Information System (INIS)

    Taguchi, Takeyoshi; Yoshii, Mitsuru; Shinoda, Kohzo

    2007-01-01

    Drilling muds are made of bentonite and other clays, and/or polymers, mixed with water to the desired viscosity. Without the drilling muds, corporations could not drill for oil and gas and we would have hardly any of the fuels and lubricants considered essential for modern industrial civilization. There are hundreds of drilling muds used and some kinds of drilling muds contain chromium. The chemical states of chromium in muds have been studied carefully due to concerns about the environmental influence. However it is difficult to determine the chemical state of chromium in drilling muds directly by conventional analytical methods. We have studied the chemical form of chromium in drilling muds by using a laboratory XAFS system and a synchrotron facility

  19. Design and Checkout of a High Speed Research Nozzle Evaluation Rig

    Science.gov (United States)

    Castner, Raymond S.; Wolter, John D.

    1997-01-01

    The High Flow Jet Exit Rig (HFJER) was designed to provide simulated mixed flow turbojet engine exhaust for one- seventh scale models of advanced High Speed Research test nozzles. The new rig was designed to be used at NASA Lewis Research Center in the Nozzle Acoustic Test Rig and the 8x6 Supersonic Wind Tunnel. Capabilities were also designed to collect nozzle thrust measurement, aerodynamic measurements, and acoustic measurements when installed at the Nozzle Acoustic Test Rig. Simulated engine exhaust can be supplied from a high pressure air source at 33 pounds of air per second at 530 degrees Rankine and nozzle pressure ratios of 4.0. In addition, a combustion unit was designed from a J-58 aircraft engine burner to provide 20 pounds of air per second at 2000 degrees Rankine, also at nozzle pressure ratios of 4.0. These airflow capacities were designed to test High Speed Research nozzles with exhaust areas from eighteen square inches to twenty-two square inches. Nozzle inlet flow measurement is available through pressure and temperature sensors installed in the rig. Research instrumentation on High Speed Research nozzles is available with a maximum of 200 individual pressure and 100 individual temperature measurements. Checkout testing was performed in May 1997 with a 22 square inch ASME long radius flow nozzle. Checkout test results will be summarized and compared to the stated design goals.

  20. Development of TIG Welding System for a Nuclear Fuel Test Rig

    International Nuclear Information System (INIS)

    Joung, Changyoung; Ahn, Sungho; Hong, Jintae; Kim, Kahye

    2013-01-01

    The welding process is one of the most important among the instrumentation processes of the nuclear fuel test rig and rods. To manufacture the nuclear fuel test rig, a precision welding system needs to be fabricated to develop various welding technologies of the fuel test rig and rods jointing the various sensors and end caps on a fuel cladding tube, which is charged with fuel pellets and component parts. Thus, we designed and fabricated the precision welding system consisting of an orbital TIG welder, a low-pressure chamber, and a high-pressure chamber. Using this system, the performance tests were performed with the round and seal spot welds for each welding condition. This paper describes not only the contents for the fabrication of precision TIG welding system but also some results from weld tests using the low-pressure and high-pressure chambers to verify the performance of this system. The TIG welding system was developed to manufacture the nuclear fuel test rig and rods. It has been configured to be able to weld the nuclear fuel test rigs and rods by applying the TIG welder using a low-pressure chamber and a high-pressure chamber. The performance tests using this system were performed with the round and seal spot welds for the welding conditions. The soundness of the orbital TIG welding system was confirmed through performance tests in the low-pressure and high-pressure chambers

  1. Work over rig itinerary optimization; Otimizacao do itinerario de sondas de intervencao

    Energy Technology Data Exchange (ETDEWEB)

    Paiva, Ronaldo Oliveira de

    1997-07-01

    The costs of work over and the loss of revenue in wells waiting work over rigs are very high. This work proposes methods to prioritize these wells in order to minimize the total cost. To determine the work over sequence it is necessary to compare the rig expense with the wells losses. For calculating the wells losses, it is necessary to analyze the monetary influence of the well shutdown in the production curves. In this work, this analysis is made by using a numerical reservoir simulator. Simplified calculation procedures are also presented. The priority of the wells is based on the reduction of the total cost, which consists of the rig costs plus the revenue losses due to work over waiting. There are many algorithms able to determine the ideal rig path. Simple and intuitive algorithms are implemented and compared. The Simulated Annealing algorithm is recommended. This algorithm was implemented to optimize work over rig routes in a brazilian production region. Optimization of the work over sequence carried out in that region in 1996 identified a potential economy of 15% in the production losses, equivalent to 4.000m{sup 3}/year of oil (25.000 b bl/year). (author)

  2. Both RIG-I and MDA5 detect alphavirus replication in concentration-dependent mode

    Energy Technology Data Exchange (ETDEWEB)

    Akhrymuk, Ivan; Frolov, Ilya; Frolova, Elena I., E-mail: evfrolova@UAB.edu

    2016-01-15

    Alphaviruses are a family of positive-strand RNA viruses that circulate on all continents between mosquito vectors and vertebrate hosts. Despite a significant public health threat, their biology is not sufficiently investigated, and the mechanisms of alphavirus replication and virus–host interaction are insufficiently understood. In this study, we have applied a variety of experimental systems to further understand the mechanism by which infected cells detect replicating alphaviruses. Our new data strongly suggest that activation of the antiviral response by alphavirus-infected cells is determined by the integrity of viral genes encoding proteins with nuclear functions, and by the presence of two cellular pattern recognition receptors (PRRs), RIG-I and MDA5. No type I IFN response is induced in their absence. The presence of either of these PRRs is sufficient for detecting virus replication. However, type I IFN activation in response to pathogenic alphaviruses depends on the basal levels of RIG-I or MDA5. - Highlights: • Both RIG-I and MDA5 detect alphavirus replication. • Alphavirus-induced transcriptional shutoff affects type I IFN induction. • Sensing of alphavirus replication by RIG-I and MDA5 depends on their concentrations. • High basal level of RIG-I and MDA5 allows IFN induction by pathogenic alphaviruses. • This dependence determines the discrepancy between the in vivo and in vitro data.

  3. Development of TIG Welding System for a Nuclear Fuel Test Rig

    Energy Technology Data Exchange (ETDEWEB)

    Joung, Changyoung; Ahn, Sungho; Hong, Jintae; Kim, Kahye [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    The welding process is one of the most important among the instrumentation processes of the nuclear fuel test rig and rods. To manufacture the nuclear fuel test rig, a precision welding system needs to be fabricated to develop various welding technologies of the fuel test rig and rods jointing the various sensors and end caps on a fuel cladding tube, which is charged with fuel pellets and component parts. Thus, we designed and fabricated the precision welding system consisting of an orbital TIG welder, a low-pressure chamber, and a high-pressure chamber. Using this system, the performance tests were performed with the round and seal spot welds for each welding condition. This paper describes not only the contents for the fabrication of precision TIG welding system but also some results from weld tests using the low-pressure and high-pressure chambers to verify the performance of this system. The TIG welding system was developed to manufacture the nuclear fuel test rig and rods. It has been configured to be able to weld the nuclear fuel test rigs and rods by applying the TIG welder using a low-pressure chamber and a high-pressure chamber. The performance tests using this system were performed with the round and seal spot welds for the welding conditions. The soundness of the orbital TIG welding system was confirmed through performance tests in the low-pressure and high-pressure chambers.

  4. Drilling Performance of Rock Drill by High-Pressure Water Jet under Different Configuration Modes

    Directory of Open Access Journals (Sweden)

    Songyong Liu

    2017-01-01

    Full Text Available In the rock drilling progress, the resistant force results in tools failure and the low drilling efficiency; thus, it is necessary to reduce the tools failure and enhance the drilling efficiency. In this paper, different configuration modes of drilling performance assisted with water jet are explored based on the mechanism and experiment analysis of rock drilling assisted with water jet. Moreover, the rotary sealing device with high pressure is designed to achieve the axial and rotation movement simultaneously as well as good sealing effect under high-pressure water jet. The results indicate that the NDB and NFB have better effects on drilling performance compared with that of NSB. Moreover, the high-pressure water jet is helpful not only to reduce the drill rod deflection, but also to reduce the probability of drill rod bending and improve the drill rod service life.

  5. On Formal and Informal Factors: Enabling Learning for Safe Offshore Drilling Operations

    Directory of Open Access Journals (Sweden)

    Trygve J. Steiro

    2017-12-01

    Full Text Available Traditional safety thinking has been concerned with investigating accident causations in order to learn from these. However, successful operations constitute the great majority of all the operations. It would thus be interesting to add a focus towards learning from operations that go well. The purpose of the current study is to identify factors that might contribute to successful operations in terms of safety. This purpose is approached by an empirical study consisting of 10 interviews with people who work on board a drilling rig currently operating in Norway. The informants who participated in the interviews hold different positions and come from different companies represented on board the rig. The findings in this study show that it can be difficult to characterize or define successful operations. The definition will be subjective; however, there are some common features of successful operations. Maintaining the life and health of people are the number one priority. A successful operation should also result in the intended product even though it might take some more time than planned. A successful operation is created by many factors and conditions. This study identified 27 factors that might contribute to successful operations in terms of safety. A lot of the theory explaining successful operations focuses on informal factors related to humans and their actions. However, the findings in this study implies that there must be both formal and informal factors present.

  6. Development of Induction Brazing System for Sealing Instrumentation Feed through Part of Nuclear Fuel Test Rig

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Jintae; Kim, Kahye; Heo, Sungho; Ahn, Sungho; Joung, Changyoung; Son, Kwangjae; Jung, Yangil [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-12-15

    To test the performance of nuclear fuels, coolant needs to be circulated through the test rig installed in the test loop. Because the pressure and temperature of the coolant is 15.5 MPa and 300 .deg. C respectively, coolant sealing is one of the most important processes in fabricating a nuclear fuel test rig. In particular, 15 instrumentation cables installed in a test rig pass through the pressure boundary, and brazing is generally applied as a sealing method. In this study, an induction brazing system has been developed using a high frequency induction heater including a vacuum chamber. For application in the nuclear field, BNi2 should be used as a paste, and optimal process variables for Ni brazing have been found by several case studies. The performance and soundness of the brazed components has been verified by a tensile test, cross section test, and sealing performance test.

  7. Role of the RIG-I-like receptors in antiviral response

    Directory of Open Access Journals (Sweden)

    Agnieszka Jabłońska

    2014-01-01

    Full Text Available The innate nonspecific immunity is the first line of defense against viral infection. Toll-like receptors (TLRs and retinoic acid-inducible gene I (RIG-I-like receptors (RLRs are two main receptor families detecting viral nucleic acid. So far, three RLR family members were characterized: RIG-I, MDA5 and LGP2. RLR constitute a family of cytoplasmic helicases, which recognized intracellular single-stranded and double-stranded RNA that is introduced to cytosol during viral infection and replication. In this work we review the current knowledge about the mechanisms of viral recognition by RIG-I-like receptors and their signaling pathways for the activation of type I interferons and pro-inflammatory cytokines synthesis.

  8. Testing of a new morphing trailing edge flap system on a novel outdoor rotating test rig

    DEFF Research Database (Denmark)

    Aagaard Madsen, Helge; Barlas, Athanasios; Løgstrup Andersen, Tom

    2015-01-01

    The morphing trailing edge system or flap system, CRTEF, has been developed over the last 10 years at DTU Wind Energy. After a promising wind tunnel test of the system in 2009 the INDUFLAP project has been carried out from 2011-2014 to transfer the technology from laboratory to industrial...... manufacturing and application. To narrow the gap between wind tunnel testing and full scale prototype testing we developed the rotating test rig. The overall objectives with the rotating test rig are: 1) to test the flap system in a realistic rotating environment with a realistic g-loading; 2) to measure...... the flap performance in real turbulent inflow and 3) to test the flap system in a realistic size and Reynolds number when comparing with full scale applications.. The rotating test rig consists of a 2.2m blade section attached to a 10m boom and mounted on a 100kW turbine platform. It was installed in June...

  9. Mach 0.3 Burner Rig Facility at the NASA Glenn Materials Research Laboratory

    Science.gov (United States)

    Fox, Dennis S.; Miller, Robert A.; Zhu, Dongming; Perez, Michael; Cuy, Michael D.; Robinson, R. Craig

    2011-01-01

    This Technical Memorandum presents the current capabilities of the state-of-the-art Mach 0.3 Burner Rig Facility. It is used for materials research including oxidation, corrosion, erosion and impact. Consisting of seven computer controlled jet-fueled combustors in individual test cells, these relatively small rigs burn just 2 to 3 gal of jet fuel per hour. The rigs are used as an efficient means of subjecting potential aircraft engine/airframe advanced materials to the high temperatures, high velocities and thermal cycling closely approximating actual operating environments. Materials of various geometries and compositions can be evaluated at temperatures from 700 to 2400 F. Tests are conducted not only on bare superalloys and ceramics, but also to study the behavior and durability of protective coatings applied to those materials.

  10. The method of rigged spaces in singular perturbation theory of self-adjoint operators

    CERN Document Server

    Koshmanenko, Volodymyr; Koshmanenko, Nataliia

    2016-01-01

    This monograph presents the newly developed method of rigged Hilbert spaces as a modern approach in singular perturbation theory. A key notion of this approach is the Lax-Berezansky triple of Hilbert spaces embedded one into another, which specifies the well-known Gelfand topological triple. All kinds of singular interactions described by potentials supported on small sets (like the Dirac δ-potentials, fractals, singular measures, high degree super-singular expressions) admit a rigorous treatment only in terms of the equipped spaces and their scales. The main idea of the method is to use singular perturbations to change inner products in the starting rigged space, and the construction of the perturbed operator by the Berezansky canonical isomorphism (which connects the positive and negative spaces from a new rigged triplet). The approach combines three powerful tools of functional analysis based on the Birman-Krein-Vishik theory of self-adjoint extensions of symmetric operators, the theory of singular quadra...

  11. Investigation of prospects for forecasting non-linear time series by example of drilling oil and gas wells

    Science.gov (United States)

    Vlasenko, A. V.; Sizonenko, A. B.; Zhdanov, A. A.

    2018-05-01

    Discrete time series or mappings are proposed for describing the dynamics of a nonlinear system. The article considers the problems of forecasting the dynamics of the system from the time series generated by it. In particular, the commercial rate of drilling oil and gas wells can be considered as a series where each next value depends on the previous one. The main parameter here is the technical drilling speed. With the aim of eliminating the measurement error and presenting the commercial speed of the object to the current with a good accuracy, future or any of the elapsed time points, the use of the Kalman filter is suggested. For the transition from a deterministic model to a probabilistic one, the use of ensemble modeling is suggested. Ensemble systems can provide a wide range of visual output, which helps the user to evaluate the measure of confidence in the model. In particular, the availability of information on the estimated calendar duration of the construction of oil and gas wells will allow drilling companies to optimize production planning by rationalizing the approach to loading drilling rigs, which ultimately leads to maximization of profit and an increase of their competitiveness.

  12. CFPL installs products pipeline with directional drilling

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland number-sign 70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line

  13. A Dynamic Behavior of the Nuclear Test Rig with Coolant using the Fluid-Structural interaction Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Tae-Ho; Hong, Jintae; Ahn, Sung-Ho; Joung, Chang-Young; Jang, Seo-Yun [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Yeon, Kon-Whi [Chungnam National University, Daejeon (Korea, Republic of)

    2016-10-15

    In this paper, the dynamic behavior of the test rig in the coolant flow simulator is evaluated by using the 2-way fluid-structural interaction analysis. The maximum value and location of the deformation and equivalent stress in the test rig is confirmed. The fluid-structural interaction analysis is applied to perform the fluid and structural analysis A fluid-structure interaction analysis is used to simulate the relationship between the deformation and hydraulic pressure. There are two types of fluid-structural interaction analysis. One is a 1-way direction analysis in which the hydraulic pressure is calculated by a CFD and transmitted to the surface of the structure, and a structural analysis is then performed. The other is a 2-way direction analysis that is performed by changing the data between the deformation of the structural and pressure of the coolant water for every time step. The location of the maximum deformation of the test rig is the bottom parts of the test rig. It is expected that the equivalent stress of the test rig is occurred. The maximum equivalent stress in the test rig under the circulation of the coolant is 90.1 MPa. The location of the maximum stress in the test rig is the connect part between the fuel rod and flow divider. A safety factor on the test rig is 3, approximately. The deformation motion of the test rig at the bottom part of the test rig is caused about the fluid-induced vibration. A test on the fluid-induced vibration of the test rig will be performed and compared with results of the analysis in further paper.

  14. The autoinhibitory CARD2-Hel2i Interface of RIG-I governs RNA selection.

    Science.gov (United States)

    Ramanathan, Anand; Devarkar, Swapnil C; Jiang, Fuguo; Miller, Matthew T; Khan, Abdul G; Marcotrigiano, Joseph; Patel, Smita S

    2016-01-29

    RIG-I (Retinoic Acid Inducible Gene-I) is a cytosolic innate immune receptor that detects atypical features in viral RNAs as foreign to initiate a Type I interferon signaling response. RIG-I is present in an autoinhibited state in the cytoplasm and activated by blunt-ended double-stranded (ds)RNAs carrying a 5' triphosphate (ppp) moiety. These features found in many pathogenic RNAs are absent in cellular RNAs due to post-transcriptional modifications of RNA ends. Although RIG-I is structurally well characterized, the mechanistic basis for RIG-I's remarkable ability to discriminate between cellular and pathogenic RNAs is not completely understood. We show that RIG-I's selectivity for blunt-ended 5'-ppp dsRNAs is ≈3000 times higher than non-blunt ended dsRNAs commonly found in cellular RNAs. Discrimination occurs at multiple stages and signaling RNAs have high affinity and ATPase turnover rate and thus a high katpase/Kd. We show that RIG-I uses its autoinhibitory CARD2-Hel2i (second CARD-helicase insertion domain) interface as a barrier to select against non-blunt ended dsRNAs. Accordingly, deletion of CARDs or point mutations in the CARD2-Hel2i interface decreases the selectivity from ≈3000 to 150 and 750, respectively. We propose that the CARD2-Hel2i interface is a 'gate' that prevents cellular RNAs from generating productive complexes that can signal. © The Author(s) 2015. Published by Oxford University Press on behalf of Nucleic Acids Research.

  15. Methods to ensure optimal off-bottom and drill bit distance under pellet impact drilling

    Science.gov (United States)

    Kovalyov, A. V.; Isaev, Ye D.; Vagapov, A. R.; Urnish, V. V.; Ulyanova, O. S.

    2016-09-01

    The paper describes pellet impact drilling which could be used to increase the drilling speed and the rate of penetration when drilling hard rock for various purposes. Pellet impact drilling implies rock destruction by metal pellets with high kinetic energy in the immediate vicinity of the earth formation encountered. The pellets are circulated in the bottom hole by a high velocity fluid jet, which is the principle component of the ejector pellet impact drill bit. The paper presents the survey of methods ensuring an optimal off-bottom and a drill bit distance. The analysis of methods shows that the issue is topical and requires further research.

  16. A field investigation to determine the impact of offshore drilling activities on natural larval settlement

    International Nuclear Information System (INIS)

    Barnett, A.; Krause, P.R.; Raimondi, P.T.

    1995-01-01

    The authors used a manipulative field experiment to test the effects of offshore drilling activities on the natural settlement of invertebrate larvae in the deep ocean (180 m) off southern California. This experiment was conducted in conjunction with other in situ experiments at a series of three drilling rigs and three reference sites between Pt. Arguello and Pt. Conception. At each study site the authors exposed settling plates to the natural environment on moorings at each of two depths near the sea floor. The two mooring depths were used to simulate differences in natural relief found in the study area. These plates were covered with a mesh to allow only natural bacterial ''filming'' to occur and prevent settlement of larger invertebrate larvae. After filming the plates were transplanted to all sites near the bottom such that each site had plates filmed at all other sites. Sterile plates (without filming) were also placed at each site. Plates were left uncovered for periods up to three years. Settling plates were retrieved at specific intervals over the length of the experiment. Upon retrieval some plates were photographed and returned to the bottom, others were returned to the laboratory. The results showed that the overall settlement rate was very slow with little settlement occurring in the first 6 months of exposure. Settlement was higher in periods of exposure lasting between one and two years. The authors also found significant effects on the number and type of larvae that settled on the plates with respect to the location of the plates (rig vs. reference), and the height from the bottom where they were located

  17. Development of a remote data acquisition and graphic display system for the sodium rigs

    International Nuclear Information System (INIS)

    Rajendran, A.; Sylvia, J.I.; Swaminathan, K.

    1992-01-01

    This paper describes the development of a Remote Data Acquisition System for Sodium Rigs. Seven data loggers, an alarm monitor and a PLC are geographically distributed in two sodium rigs over a distance of 500 m. A serial data highway based on RS485 transceivers has been constructed to remotely acquire data from these stations. The field stations are connected to the data highway in a multi drop fashion. A PC/AT computer on the same bus remotely acquires and monitors the data from the field stations. (author). 3 refs., 2 figs

  18. Test rig overview for validation and reliability testing of shutdown system software

    International Nuclear Information System (INIS)

    Zhao, M.; McDonald, A.; Dick, P.

    2007-01-01

    The test rig for Validation and Reliability Testing of shutdown system software has been upgraded from the AECL Windows-based test rig previously used for CANDU6 stations. It includes a Virtual Trip Computer, which is a software simulation of the functional specification of the trip computer, and a real-time trip computer simulator in a separate chassis, which is used during the preparation of trip computer test cases before the actual trip computers are available. This allows preparation work for Validation and Reliability Testing to be performed in advance of delivery of actual trip computers to maintain a project schedule. (author)

  19. Stress-life relation of the rolling-contact fatigue spin rig

    Science.gov (United States)

    Butler, Robert H; Carter, Thomas L

    1957-01-01

    The rolling-contact fatigue spin rig was used to test groups of SAE 52100 9.16-inch-diameter balls lubricated with a mineral oil at 600,000-, 675,000-, and 750,000-psi maximum Hertz stress. Cylinders of AISI M-1 vacuum and commercial melts and MV-1 (AISI M-50) were used as race specimens. Stress-life exponents produced agree closely with values accepted in industry. The type of failure obtained in the spin rig was similar to the subsurface fatigue spells found in bearings.

  20. Oxidation of a Silica-Containing Material in a Mach 0.3 Burner Rig

    Science.gov (United States)

    Nguyen, QuynhGiao N.; Cuy, Michael D.; Gray, Hugh R. (Technical Monitor)

    2002-01-01

    A primarily silica-containing material with traces of organic compounds, as well as aluminum and calcium additions, was exposed to a Mach 0.3 burner rig at atmospheric pressure using jet fuel. The sample was exposed for 5 continuous hours at 1370 C. Post exposure x-ray diffraction analyses indicate formation of cristobalite, quartz, NiO and Spinel (Al(Ni)CR2O4). The rig hardware is composed of a nickel-based superalloy with traces of Fe. These elements are indicated in the energy dispersive spectroscopy (EDS) results. This material was studied as a candidate for high temperature applications under an engine technology program.

  1. Deep drilling KLX 02. Drilling and documentation of a 1700 m deep borehole at Laxemar, Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, O [VBB VIAK AB, Malmoe (Sweden)

    1994-08-01

    In this report the preparation and execution of the deep core drilling KLX 02 is described. The hole was drilled with the wireline methods, NQ dimension (diameter 76 mm), to a final depth of 1700.5 m. Prior to core drilling a diameter 215 mm pilot hole was pre drilled to 200 m with controlled hammer drilling (DTH). In this hole casing and air-lift equipment was installed with the aim to support the circulation of drilling fluid. During core drilling there was a measurement of major drilling parameters and drilling fluid in and out of hole. As a fluid tracer uranine was used. Each 300 m of core drilling air-lift pump tests were performed. After completion a flow-meter log was run to finalize the project phase. It can be concluded that both the pre drilling and core drilling methods used proved to be successful. No severe technical problem occurred. However, potential risks have been pointed at in the report. The air-lift system functioned only partly and has to be modified for further use. Also the technique for monitoring of drilling parameters needs improvement as does the method for air-lift pump tests with packer. The organisation model for planning and realization functioned satisfactory and can be recommended for similar future projects. 9 refs, numerous tabs and figs.

  2. New optimized drill pipe size for deep-water, extended reach and ultra-deep drilling

    Energy Technology Data Exchange (ETDEWEB)

    Jellison, Michael J.; Delgado, Ivanni [Grant Prideco, Inc., Hoston, TX (United States); Falcao, Jose Luiz; Sato, Ademar Takashi [PETROBRAS, Rio de Janeiro, RJ (Brazil); Moura, Carlos Amsler [Comercial Perfuradora Delba Baiana Ltda., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    A new drill pipe size, 5-7/8 in. OD, represents enabling technology for Extended Reach Drilling (ERD), deep water and other deep well applications. Most world-class ERD and deep water wells have traditionally been drilled with 5-1/2 in. drill pipe or a combination of 6-5/8 in. and 5-1/2 in. drill pipe. The hydraulic performance of 5-1/2 in. drill pipe can be a major limitation in substantial ERD and deep water wells resulting in poor cuttings removal, slower penetration rates, diminished control over well trajectory and more tendency for drill pipe sticking. The 5-7/8 in. drill pipe provides a significant improvement in hydraulic efficiency compared to 5-1/2 in. drill pipe and does not suffer from the disadvantages associated with use of 6-5/8 in. drill pipe. It represents a drill pipe assembly that is optimized dimensionally and on a performance basis for casing and bit programs that are commonly used for ERD, deep water and ultra-deep wells. The paper discusses the engineering philosophy behind 5-7/8 in. drill pipe, the design challenges associated with development of the product and reviews the features and capabilities of the second-generation double-shoulder connection. The paper provides drilling case history information on significant projects where the pipe has been used and details results achieved with the pipe. (author)

  3. Deep drilling KLX 02. Drilling and documentation of a 1700 m deep borehole at Laxemar, Sweden

    International Nuclear Information System (INIS)

    Andersson, O.

    1994-08-01

    In this report the preparation and execution of the deep core drilling KLX 02 is described. The hole was drilled with the wireline methods, NQ dimension (diameter 76 mm), to a final depth of 1700.5 m. Prior to core drilling a diameter 215 mm pilot hole was pre drilled to 200 m with controlled hammer drilling (DTH). In this hole casing and air-lift equipment was installed with the aim to support the circulation of drilling fluid. During core drilling there was a measurement of major drilling parameters and drilling fluid in and out of hole. As a fluid tracer uranine was used. Each 300 m of core drilling air-lift pump tests were performed. After completion a flow-meter log was run to finalize the project phase. It can be concluded that both the pre drilling and core drilling methods used proved to be successful. No severe technical problem occurred. However, potential risks have been pointed at in the report. The air-lift system functioned only partly and has to be modified for further use. Also the technique for monitoring of drilling parameters needs improvement as does the method for air-lift pump tests with packer. The organisation model for planning and realization functioned satisfactory and can be recommended for similar future projects. 9 refs, numerous tabs and figs

  4. Trends in the Drilling Waste Management

    Directory of Open Access Journals (Sweden)

    Lucyna Czekaj

    2006-10-01

    Full Text Available Petroleum Industry is trying to achieve sustainable development goals. Each year new solutions are implemented to minimize the environmental impact of drilling operations. The paper presents trends in the drilling waste management caused by introducing the sustainable development into the petroleum industry. Old solutions such as the drilling waste disposal at the waste dump or dumping ground are not acceptable from the environmental point of view. The paper presents an analysis of new solutions as the sustainable solutions. The most important problem is the chemical pollution in cuttings and the waste drilling mud. The industrial solutions as well as the laboratory research on the pollution removing from drilling wastes are analysed. The most promising method seems to be the recycling and design for the environment of drilling mud.

  5. PDVSA INTEVEP Technologies in oil well drilling

    International Nuclear Information System (INIS)

    Bolivar, C.; Rafael, A.; Davila, Manuel A.

    1998-01-01

    The orimulsion, the generation of catalytic technologies and the development of HDH (process which transform heavy crudes in light crudes), are examples of some of the well known technologies developed by PDVSA INTEVEP. But the drilling oil wells technologies developed by the same entreprise, even though are very important, are less known all around the world. This document describes some products developed through those technologies: THIXOGAS T M which is an antimigratory aditive; INTEFLOW T M which is a fluid for drilling, complementation and rehabilitation of oil drills; INTERCAB T M which is an aditive for fluids in drilling; orimatita which is a denser for drilling fluids; CARBOLIG T M which is an aditive for drilling fluids; and many other products and technologies in development, impacted considerably the venezuelan economy by preserving the environment and saving quite an important amount of money in 1997 (Bs. 3.000 M M)

  6. Shipboard Analytical Capabilities on the Renovated JOIDES Resolution, IODP Riserless Drilling Vessel

    Science.gov (United States)

    Blum, P.; Foster, P.; Houpt, D.; Bennight, C.; Brandt, L.; Cobine, T.; Crawford, W.; Fackler, D.; Fujine, K.; Hastedt, M.; Hornbacher, D.; Mateo, Z.; Moortgat, E.; Vasilyev, M.; Vasilyeva, Y.; Zeliadt, S.; Zhao, J.

    2008-12-01

    The JOIDES Resolution (JR) has conducted 121 scientific drilling expeditions during the Ocean Drilling Program (ODP) and the first phase of the Integrated Ocean Drilling Program (IODP) (1983-2006). The vessel and scientific systems have just completed an NSF-sponsored renovation (2005-2008). Shipboard analytical systems have been upgraded, within funding constraints imposed by market driven vessel conversion cost increases, to include: (1) enhanced shipboard analytical services including instruments and software for sampling and the capture of chemistry, physical properties, and geological data; (2) new data management capabilities built around a laboratory information management system (LIMS), digital asset management system, and web services; (3) operations data services with enhanced access to navigation and rig instrumentation data; and (4) a combination of commercial and home-made user applications for workflow- specific data extractions, generic and customized data reporting, and data visualization within a shipboard production environment. The instrumented data capture systems include a new set of core loggers for rapid and non-destructive acquisition of images and other physical properties data from drill cores. Line-scan imaging and natural gamma ray loggers capture data at unprecedented quality due to new and innovative designs. Many instruments used to characterize chemical compounds of rocks, sediments, and interstitial fluids were upgraded with the latest technology. The shipboard analytical environment features a new and innovative framework (DESCinfo) and application (DESClogik) for capturing descriptive and interpretive data from geological sub-domains such as sedimentology, petrology, paleontology, structural geology, stratigraphy, etc. This system fills a long-standing gap by providing a global database, controlled vocabularies and taxa name lists with version control, a highly configurable spreadsheet environment for data capture, and

  7. Design and Demonstration of a Test-Rig for Static Performance-Studies of Permanent Magnet Couplings

    DEFF Research Database (Denmark)

    Högberg, Stig; Jensen, Bogi Bech; Bendixen, Flemming Buus

    2013-01-01

    The design and construction of an easy-to-use test-rig for permanent magnet couplings is presented. Static torque of permanent magnet couplings as a function of angular displacement is measured of permanent magnet couplings through an semi-automated test system. The test-rig is capable of measuring...

  8. 78 FR 70326 - Rigging Equipment for Material Handling; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2013-11-25

    ...] Rigging Equipment for Material Handling; Extension of the Office of Management and Budget's (OMB) Approval... on Rigging Equipment for Material Handling (29 CFR 1926.251). These paragraphs require affixing... automated or other technological information collection and transmission techniques. III. Proposed Actions...

  9. A compact internal drum test rig for measurements of rolling contact forces between a single tread block and a substrate

    NARCIS (Netherlands)

    Lundberg, O.E.; Kari, L.; Lopez Arteaga, I.

    2017-01-01

    A novel test rig design is presented which enables detailed studies of the three force components generated in the impact and release phase of rolling contact between a tyre tread block and a substrate. The design of the compact internal drum test rig provides realistic impact and release angles for

  10. Test plan for core drilling ignitability testing

    International Nuclear Information System (INIS)

    Witwer, K.S.

    1996-01-01

    The objective of this testing is to determine if ignition occurs while core drilling in a flammable gas environment. Drilling parameters are chosen so as to provide bounding conditions for the core sampling environment. If ignition does not occur under the conditions set forth in this test, then a satisfactory level of confidence will be obtained which would allow field operations under the normal drilling conditions

  11. Avoiding pollution in scientific ocean drilling

    International Nuclear Information System (INIS)

    Francis, T.J.G.

    1999-01-01

    Scientific ocean drilling has been carried out in the world's oceans since the nineteen sixties. From 1968-83 the Deep Sea Drilling Project (DSDP), managed by the Scripps Institution of Oceanography in California under a contract with the US National Science Foundation, employed the drilling vessel Glomar Challenger for this purpose. In January 1985 the Ocean Drilling Program (GDP), operated by Texas A and M University, began operations with the drillship JOIDES Resolution which continue to this day. The principal funding agency remains the US National Science Foundation, but since its inception GDP has been an international program and currently receives financial support from 21 countries. The ODP operates globally and, as with DSDP before it, drills without a riser or blowout preventer in a wide range of geological environments. Water depths at GDP drill sites have ranged from 38 m to 5969 m, but are typically within the range 1000-5000 m. Depths of penetration at GDP drill sites, while generally less than 1000 m, have ranged up to 2111 m below the sea floor. The drilling fluid is seawater, although occasional slugs of mud are circulated to clean or condition the hole. Thus drilling is carried out without well control, i.e. without the ability to control pressures within the well. Because of the absence of well control, it is vital to ensure that the drillship does not drill into an accumulation of oil or gas. Drilling into a charged reservoir and causing oil or gas to escape into the marine environment is recognised as the main pollution hazard in scientific ocean drilling

  12. Newberry exploratory slimhole: Drilling and testing

    Energy Technology Data Exchange (ETDEWEB)

    Finger, J.T.; Jacobson, R.D.; Hickox, C.E.

    1997-11-01

    During July--November, 1995, Sandia National Laboratories, in cooperation with CE Exploration, drilled a 5,360 feet exploratory slimhole (3.895 inch diameter) in the Newberry Known Geothermal Resource Area (KGRA) near Bend, Oregon. This well was part of Sandia`s program to evaluate slimholes as a geothermal exploration tool. During and after drilling the authors performed numerous temperature logs, and at the completion of drilling attempted to perform injection tests. In addition to these measurements, the well`s data set includes: over 4,000 feet of continuous core (with detailed log); daily drilling reports from Sandia and from drilling contractor personnel; daily drilling fluid record; and comparative data from other wells drilled in the Newberry KGRA. This report contains: (1) a narrative account of the drilling and testing, (2) a description of equipment used, (3) a brief geologic description of the formation drilled, (4) a summary and preliminary interpretation of the data, and (5) recommendations for future work.

  13. Effects of drilling fluids on marine organisms

    International Nuclear Information System (INIS)

    Parrish, P.R.; Duke, T.W.

    1990-01-01

    This paper reports on drilling fluids, also called drilling muds, which are essential to drilling processes in the exploration and production of oil and gas from the U.S. Outer Continental Shelf (OCS). These fluids are usually discharged from drilling platforms into surrounding waters of the OCS and are regulated by the U.S. Environmental Protection Agency (EPA). In a program carried out by the EPA Environmental research Laboratory at Gulf Breeze, Florida, diverse marine species as well as microbiotic and macrobiotic communities were studied. Drilling fluids were toxic to marine organisms in certain concentrations and exposure regimes. Furthermore, the fluids adversely affected the benthos physically by burying them or by altering the substrates. Toxicity of the drilling-fluid components, used drilling fluids from active Gulf of Mexico sites, and laboratory-prepared drilling fluids varied considerably. for example 96-h LC 50 s were from 25 μ liter -1 to > 1500 μl liter -1 for clams, larval lobsters, mysids, and grass shrimp. In most instances, mortality was significantly (α = 0.05) correlated with the diesel-oil content of the fluids collected from the Gulf of Mexico. Data and model simulations suggest a rapid dilution of drilling fluids released into OCS waters, resulting in concentrations below the acute-effect concentration for the water column organisms tested

  14. Numerical Modeling of Foam Drilling Hydraulics

    Directory of Open Access Journals (Sweden)

    Ozcan Baris

    2007-12-01

    Full Text Available The use of foam as a drilling fluid was developed to meet a special set of conditions under which other common drilling fluids had failed. Foam drilling is defined as the process of making boreholes by utilizing foam as the circulating fluid. When compared with conventional drilling, underbalanced or foam drilling has several advantages. These advantages include: avoidance of lost circulation problems, minimizing damage to pay zones, higher penetration rates and bit life. Foams are usually characterized by the quality, the ratio of the volume of gas, and the total foam volume. Obtaining dependable pressure profiles for aerated (gasified fluids and foam is more difficult than for single phase fluids, since in the former ones the drilling mud contains a gas phase that is entrained within the fluid system. The primary goal of this study is to expand the knowledge-base of the hydrodynamic phenomena that occur in a foam drilling operation. In order to gain a better understanding of foam drilling operations, a hydrodynamic model is developed and run at different operating conditions. For this purpose, the flow of foam through the drilling system is modeled by invoking the basic principles of continuum mechanics and thermodynamics. The model was designed to allow gas and liquid flow at desired volumetric flow rates through the drillstring and annulus. Parametric studies are conducted in order to identify the most influential variables in the hydrodynamic modeling of foam flow.

  15. The Design and Manufacturing Report of Plug Type Non-Instrumented Rig for Irradiation Test in HANARO OR Hole

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Ho; Bang, Je Geon; Lim, Ik Sung; Kim, Sun Ki; Yang, Yong Sik; Song, Kun Woo

    2008-09-15

    This project is developed the plug type non-instrumented irradiation test rig of the advanced nuclear fuel in HANARO for pursuit advanced performance in High Performance Fuel Technology Development as a part Nuclear Mid and Long-term R and D Program. This irradiation rig was confirmed the integrity and HANARO core compatibility by the optimum design and the thermal hydraulic out-pile test in FIVPET. The characteristic of plug type non-instrument rig is to possible irradiation test of variable in-pile condition and reduced the wastes for reusable as function. This plug type non-instrumented rig was satisfied the quality assurance requirements and written out the end of manufacturing report. This plug type non-instrumented rig is adopt to the irradiation test for nuclear fuel irradiation test in HANARO OR hole.

  16. Development of a test rig and its application for validation and reliability testing of safety-critical software

    Energy Technology Data Exchange (ETDEWEB)

    Thai, N D; McDonald, A M [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    This paper describes a versatile test rig developed by AECL for functional testing of safety-critical software used in the process trip computers of the Wolsong CANDU stations. The description covers the hardware and software aspects of the test rig, the test language and its interpreter, and other major testing software utilities such as the test oracle, sampler and profiler. The paper also discusses the application of the rig in the final stages of testing of the process trip computer software, namely validation and reliability tests. It shows how random test cases are generated, test scripts prepared and automatically run on the test rig. The versatility of the rig is further demonstrated in other types of testing such as sub-system tests, verification of the test oracle, testing of newly-developed test script, self-test and calibration. (author). 5 tabs., 10 figs.

  17. Development of a test rig and its application for validation and reliability testing of safety-critical software

    International Nuclear Information System (INIS)

    Thai, N.D.; McDonald, A.M.

    1995-01-01

    This paper describes a versatile test rig developed by AECL for functional testing of safety-critical software used in the process trip computers of the Wolsong CANDU stations. The description covers the hardware and software aspects of the test rig, the test language and its interpreter, and other major testing software utilities such as the test oracle, sampler and profiler. The paper also discusses the application of the rig in the final stages of testing of the process trip computer software, namely validation and reliability tests. It shows how random test cases are generated, test scripts prepared and automatically run on the test rig. The versatility of the rig is further demonstrated in other types of testing such as sub-system tests, verification of the test oracle, testing of newly-developed test script, self-test and calibration. (author). 5 tabs., 10 figs

  18. Slow drilling speeds for single-drill implant bed preparation. Experimental in vitro study.

    Science.gov (United States)

    Delgado-Ruiz, R A; Velasco Ortega, E; Romanos, G E; Gerhke, S; Newen, I; Calvo-Guirado, J L

    2018-01-01

    To evaluate the real-time bone temperature changes during the preparation of the implant bed with a single-drill protocol with different drill designs and different slow drilling speeds in artificial type IV bone. For this experimental in vitro study, 600 implant bed preparations were performed in 10 bovine bone disks using three test slow drilling speeds (50/150/300 rpm) and a control drilling speed (1200 rpm). The temperature at crestal and apical areas and time variations produced during drilling with three different drill designs with similar diameter and length but different geometry were recorded with real-life thermographic analysis. Statistical analysis was performed by two-way analysis of variance. Multiple comparisons of temperatures and time with the different drill designs and speeds were performed with the Tukey's test. T Max values for the control drilling speed with all the drill designs (D1 + 1200; D2 + 1200; D3 + 1200) were higher compared to those for the controls for 11 ± 1.32 °C (p drilling at 50 rpm resulted in the lowest temperature increment (22.11 ± 0.8 °C) compared to the other slow drilling speeds of 150 (24.752 ± 1.1 °C) and 300 rpm (25.977 ± 1.2 °C) (p drilling speeds compared to that for the control drilling speed. Slow drilling speeds required significantly more time to finish the preparation of the implant bed shown as follows: 50 rpm > 150 rpm > 300 rpm > control (p drill protocol with slow drilling speeds (50, 150, and 300 rpm) without irrigation in type IV bone increases the temperature at the coronal and apical levels but is below the critical threshold of 47 °C. The drill design in single-drill protocols using slow speeds (50, 150, and 300 rpm) does not have an influence on the thermal variations. The time to accomplish the implant bed preparation with a single-drill protocol in type IV bone is influenced by the drilling speed and not by the drill design. As the speed decreases, then

  19. Development and verification of a reciprocating test rig designed for investigation of piston ring tribology

    DEFF Research Database (Denmark)

    Pedersen, Michael Torben; Imran, Tajammal; Klit, Peder

    2009-01-01

    This paper describes the development and verification of a reciprocating test rig, which was designed to study the piston ring tribology. A crank mechanism is used to generate a reciprocating motion for a moving plate, which acts as the liner. A stationary block acting as the ring package is loaded......, which is suitable for the study of piston ring tribology....

  20. Rig Technician: Apprenticeship Course Outline. Apprenticeship and Industry Training. 5211.1

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2011

    2011-01-01

    The graduate of the Rig Technician apprenticeship program is a certified journeyperson who will be able to: (1) take responsibility for personal safety and the safety of others; (2) supervise, coach and train apprentices and floor hands; (3) perform the duties of a motorhand, derrickhand or driller; and (4) perform assigned tasks in accordance…

  1. Flap testing on the rotating test rig in the INDUFLAP project

    DEFF Research Database (Denmark)

    Barlas, Athanasios; Aagaard Madsen, Helge; Enevoldsen, Karen

    Tests of a prototype Controllable Rubber Trailing Edge Flap (CRTEF) are performed on the rotating test rig at the Risø campus of DTU. The general description and objectives are presented, along with an overview of sensors on the setup and the test cases. The post-processing of data is discussed...

  2. Modelling and simulation of dynamic wheel-rail interaction using a roller rig

    International Nuclear Information System (INIS)

    Anyakwo, A; Pislaru, C; Ball, A; Gu, F

    2012-01-01

    The interaction between the wheel and rail greatly influences the dynamic response of railway vehicles on the track. A roller rig facility can be used to study and monitor real time parameters that influence wheel-rail interaction such as wear, adhesion, friction and corrugation without actual field tests being carried out. This paper presents the development of the mathematical models for full scale roller rig and 1/5 scale roller rig and the wear prediction model based on KTH wear function. The simulated critical speed for the 1/5 scale roller rig is about one-fifth of the critical speed for the full scale model so the simulated results compare well with the theory related to wheel-rail contact and dynamics. Also the differences between the simulated rolling radii for the full scale model with and without wear function are analysed. This paper presents the initial stage of a large scale research project where the influence of wear on the wheel-rail performance will be studied in more depth.

  3. Complete Genome Sequence of the Campylobacter ureolyticus Clinical Isolate RIGS 9880

    DEFF Research Database (Denmark)

    Miller, William G; Yee, Emma; On, Stephen L W

    2015-01-01

    The emerging pathogen Campylobacter ureolyticus has been isolated from human and animal genital infections, human periodontal disease, domestic and food animals, and from cases of human gastroenteritis. We report the whole-genome sequence of the human clinical isolate RIGS 9880, which is the first...

  4. Automatic X-ray television rig for high-speed radiography of polycrystals

    International Nuclear Information System (INIS)

    Bezbakh, V.D.; Garasim, Yu.A.; Oshkaderov, S.P.; Pet'kov, V.V.

    1993-01-01

    The high-speed radiography method is used for studying the phase and structural transformation in metals and alloys during rapid changes in temperature. In order to improve the effectiveness of this method the Institute of Metal Physics, Ukrainian Academy of Sciences, has developed an automatic rig for high-speed radiography of polycrystalline materials using a television method for recording the x-ray diffraction patterns. The rig, described here, consists of an x-ray block, a vacuum chamber, a device for programmed electro-contact heating of specimens, a system for imaging and scanning x-ray diffraction patterns, and a system for collecting and analyzing the data. Focusing is carried out by the Zeeman-Bolin method. The new rig helps to significantly reduce the recording time and ensures adequate quality and reliability of the recorded diffraction image over a wide range of temperatures. Data using the rig is presented for high-speed radiography for cooling a specimen of G20 steel. 4 refs., 4 figs

  5. Computational Analysis of a South African Mobile Trailer-Type Medium Sized Tyre Test Rig

    CSIR Research Space (South Africa)

    Sharma, Shikar

    2015-04-01

    Full Text Available To support the South African National Defence Force with their vehicle mobility needs, the CSIR has begun characterising tyres by using a medium, trailer-type, tyre test rig. Two different Pacejka tyre models were generated using two independent...

  6. Evaluation of wheel/rail contact mechanics : roller rig concept design review.

    Science.gov (United States)

    2014-07-01

    A need exists for a new test rig design with advanced sensing technologies that will allow the railroad industry and regulatory : agencies to better understand the wheel-rail contact dynamics and mechanics, especially as it pertains to high-speed rai...

  7. 77 FR 23117 - Rigging Equipment for Material Handling Construction Standard; Correction and Technical Amendment

    Science.gov (United States)

    2012-04-18

    ... Equipment for Material Handling Construction Standard; Correction and Technical Amendment AGENCY... AND HEALTH REGULATIONS FOR CONSTRUCTION Subpart H--Materials Handling, Storage, Use, and Disposal 0 1... amendment. SUMMARY: OSHA is correcting its sling standard for construction titled ``Rigging Equipment for...

  8. Environmental Measurement-While-Drilling System and Horizontal Directional Drilling Technology Demonstration, Hanford Site

    International Nuclear Information System (INIS)

    Williams, C.V.; Lockwood, G.J.; Normann, R.A.; Myers, D.A.; Gardner, M.G.; Williamson, T.; Huffman, J.

    1999-01-01

    The Environmental Measurement-While-Drilling (EMWD) system and Horizontal Directional Drilling (HDD) were successfully demonstrated at the Mock Tank Leak Simulation Site and the Drilling Technology Test Site, Hanford, Washington. The use of directional drilling offers an alternative to vertical drilling site characterization. Directional drilling can develop a borehole under a structure, such as a waste tank, from an angled entry and leveling off to horizontal at the desired depth. The EMWD system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental and drill bit data during drilling operations. The technology demonstration consisted of the development of one borehole under a mock waste tank at a depth of approximately minus8 m (minus27 ft.), following a predetermined drill path, tracking the drill path to within a radius of approximately1.5 m (5 ft.), and monitoring for zones of radiological activity using the EMWD system. The purpose of the second borehole was to demonstrate the capability of drilling to a depth of ∼ -21 m (-70 ft.), the depth needed to obtain access under the Hanford waste tanks, and continue drilling horizontally. This report presents information on the HDD and EMWD technologies, demonstration design, results of the demonstrations, and lessons learned

  9. 30 CFR 57.7050 - Tool and drill steel racks.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Tool and drill steel racks. 57.7050 Section 57... Rotary Jet Piercing Drilling-Surface and Underground § 57.7050 Tool and drill steel racks. Receptacles or racks shall be provided for drill steel and tools stored or carried on drills. ...

  10. Application of fine managed pressure drilling technique in complex wells with both blowout and lost circulation risks

    Directory of Open Access Journals (Sweden)

    Ling Yan

    2015-03-01

    Full Text Available Fractured carbonate reservoirs are susceptible to blowout and lost circulation during drilling, which not only restricts drilling speed, but also poses big threat to well control. Moreover, there are few technical means available to reconstruct pressure balance in the borehole. Accordingly, the fine managed pressure drilling was used in the drilling of Well GS19 in the Qixia Formation with super-high pressure and narrow density window, which is a success: ① back pressure in the annular spaces will be adjusted to maintain a slightly over-balanced bottom-hole hydraulic pressure, and fluid level in the circulation tank will be kept in a slight dropping state to ensure that natural gas in the formation would not invade into the borehole in a massive volume; ② inlet drilling fluid density will be controlled at around 2.35 g/cm3, back pressures in the annular be maintained at 2–5 MPa, and bottom-hole pressure equivalent circulation density be controlled at 2.46–2.52 g/cm3; ③ during managed pressure drilling operations, if wellhead pressure exceeds or expects to exceed 7 MPa, semi-blind rams will be closed. Fluids will pass through the choke manifold of the rig to the choke manifold specifically for pressure control before entering gas/liquid separators to discharge gas; ④ during tripping back pressure will be kept at less than 5 MPa, volume of injected drilling fluid will be higher than the theoretical volume during tripping out, whereas the volume of returned drilling fluid will be higher than the theoretical volume during the out-tripping. This technique has been applied successfully in the drilling of the Qixia Formation, Liangshan Formation and Longmaxi Formation with a total footage of 216.60 m, as a good attempt in complicated wells with both blowout and lost circulation risks, which can provide valuable experiences and guidance for handling similar complexities in the future.

  11. Laser Drilling - Drilling with the Power of Light

    Energy Technology Data Exchange (ETDEWEB)

    Iraj A. Salehi; Brian C. Gahan; Samih Batarseh

    2007-02-28

    Gas Technology Institute (GTI) has been the leading investigator in the field of high power laser applications research for well construction and completion applications. Since 1997, GTI (then as Gas Research Institute- GRI) has investigated several military and industrial laser systems and their ability to cut and drill into reservoir type rocks. In this report, GTI continues its investigation with a 5.34 kW ytterbium-doped multi-clad high power fiber laser (HPFL). When compared to its competitors; the HPFL represents a technology that is more cost effective to operate, capable of remote operations, and requires considerably less maintenance and repair. Work performed under this contract included design and implementation of laboratory experiments to investigate the effects of high power laser energy on a variety of rock types. All previous laser/rock interaction tests were performed on samples in the lab at atmospheric pressure. To determine the effect of downhole pressure conditions, a sophisticated tri-axial cell was designed and tested. For the first time, Berea sandstone, limestone and clad core samples were lased under various combinations of confining, axial and pore pressures. Composite core samples consisted of steel cemented to rock in an effort to represent material penetrated in a cased hole. The results of this experiment will assist in the development of a downhole laser perforation or side tracking prototype tool. To determine how this promising laser would perform under high pressure in-situ conditions, GTI performed a number of experiments with results directly comparable to previous data. Experiments were designed to investigate the effect of laser input parameters on representative reservoir rock types of sandstone and limestone. The focus of the experiments was on laser/rock interaction under confining pressure as would be the case for all drilling and completion operations. As such, the results would be applicable to drilling, perforation, and

  12. Coiled tubing drilling with supercritical carbon dioxide

    Science.gov (United States)

    Kolle , Jack J.

    2002-01-01

    A method for increasing the efficiency of drilling operations by using a drilling fluid material that exists as supercritical fluid or a dense gas at temperature and pressure conditions existing at a drill site. The material can be used to reduce mechanical drilling forces, to remove cuttings, or to jet erode a substrate. In one embodiment, carbon dioxide (CO.sub.2) is used as the material for drilling within wells in the earth, where the normal temperature and pressure conditions cause CO.sub.2 to exist as a supercritical fluid. Supercritical carbon dioxide (SC--CO.sub.2) is preferably used with coiled tube (CT) drilling equipment. The very low viscosity SC--CO.sub.2 provides efficient cooling of the drill head, and efficient cuttings removal. Further, the diffusivity of SC--CO.sub.2 within the pores of petroleum formations is significantly higher than that of water, making jet erosion using SC--CO.sub.2 much more effective than water jet erosion. SC--CO.sub.2 jets can be used to assist mechanical drilling, for erosion drilling, or for scale removal. A choke manifold at the well head or mud cap drilling equipment can be used to control the pressure within the borehole, to ensure that the temperature and pressure conditions necessary for CO.sub.2 to exist as either a supercritical fluid or a dense gas occur at the drill site. Spent CO.sub.2 can be vented to the atmosphere, collected for reuse, or directed into the formation to aid in the recovery of petroleum.

  13. Efficient drilling problem detection. Early fault detection by the combination of physical models and artificial intelligence

    Energy Technology Data Exchange (ETDEWEB)

    Nyboe, Roar

    2009-09-15

    The drilling of an oil or gas well is an expensive undertaking. Hence, it is not surprising that mistakes and accidents during drilling incur a high cost. Accidents could result in the loss of expensive equipment and subsequent delays setting back the operation for days or weeks and thus running up large bills on rig-time and personnel hours. Some types of accidents also pose a risk to the personnel or the environment. In this dissertation we study alarm systems which could give the driller an early warning of upcoming problems, and thus provide time to avoid these accidents. We explore alarm systems which combine advanced physical models of the well and drilling process with artificial intelligence and time series analysis. Finally, we determine the advantages as well as the challenges of this approach. It is our hope that this dissertation is accessible to both practitioners in machine learning and control engineering, as well as to petroleum engineers with a passing familiarity with machine learning. Hence this dissertation starts with a quick introduction to drilling problems and some terms from time series analysis and machine learning. We then briefly describe the theory of observer-based fault detection and isolation. Theories of supervisory control systems are also introduced, as these concern both the choice of algorithms and how AI-based alarm systems integrate with the rest of the operation. From chapter 6 and onward, the challenges to fault detection in drilling are discussed. We focus on clarifying what restrictions the available training data put on our choice of machine learning methods. In chapter 8 and 9, we propose ways to combine machine learning and observer-based fault detection. Experimental results are presented in chapter 10, before we end with concluding remarks in chapter 11. Our main conclusion, reflected in our experimental results, is that physical models and artificial intelligence can be combined to produce hybrid alarm systems that

  14. 30 CFR 77.1007 - Drilling; general.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Drilling; general. 77.1007 Section 77.1007 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... Control § 77.1007 Drilling; general. (a) Equipment that is to be used during a shift shall be inspected...

  15. Electric motor for laser-mechanical drilling

    Science.gov (United States)

    Grubb, Daryl L.; Faircloth, Brian O.; Zediker, Mark S.

    2015-07-07

    A high power laser drilling system utilizing an electric motor laser bottom hole assembly. A high power laser beam travels within the electric motor for advancing a borehole. High power laser drilling system includes a down hole electrical motor having a hollow rotor for conveying a high power laser beam through the electrical motor.

  16. Neurosurgical robotic arm drilling navigation system.

    Science.gov (United States)

    Lin, Chung-Chih; Lin, Hsin-Cheng; Lee, Wen-Yo; Lee, Shih-Tseng; Wu, Chieh-Tsai

    2017-09-01

    The aim of this work was to develop a neurosurgical robotic arm drilling navigation system that provides assistance throughout the complete bone drilling process. The system comprised neurosurgical robotic arm navigation combining robotic and surgical navigation, 3D medical imaging based surgical planning that could identify lesion location and plan the surgical path on 3D images, and automatic bone drilling control that would stop drilling when the bone was to be drilled-through. Three kinds of experiment were designed. The average positioning error deduced from 3D images of the robotic arm was 0.502 ± 0.069 mm. The correlation between automatically and manually planned paths was 0.975. The average distance error between automatically planned paths and risky zones was 0.279 ± 0.401 mm. The drilling auto-stopping algorithm had 0.00% unstopped cases (26.32% in control group 1) and 70.53% non-drilled-through cases (8.42% and 4.21% in control groups 1 and 2). The system may be useful for neurosurgical robotic arm drilling navigation. Copyright © 2016 John Wiley & Sons, Ltd.

  17. Drilling Fluids Using Multiwall Carbon Nanotube (MWCNT

    Directory of Open Access Journals (Sweden)

    Mostafa Sedaghatzadeh

    2012-11-01

    Full Text Available Designing drilling fluids for drilling in deep gas reservoirs and geothermal wells is a major challenge. Cooling drilling fluids and preparing stable mud with high thermal conductivity are of great concern. Drilling nanofluids, i.e. a low fraction of carbon nanotube (CNT well dispersed in mud, may enhance the mixture thermal conductivity compared to the base fluids. Thus, they are potentially useful for advanced designing high temperature and high pressure (HTHP drilling fluids. In the present study, the impacts of CNT volume fraction, ball milling time, functionalization, temperature, and dispersion quality (by means of scanning electron microscopy, SEM on the thermal and rheological properties of water-based mud are experimentally investigated. The thermal conductivities of the nano-based drilling fluid are measured with a transient hot wire method. The experimental results show that the thermal conductivity of the water-based drilling fluid is enhanced by 23.2% in the presence of 1 vol% functionalized CNT at room temperature; it increases by 31.8% by raising the mud temperature to 50 °C. Furthermore, significant improvements are seen in the rheological properties—such as yield point, filtration properties, and annular viscosity—of the CNTmodified drilling fluid compared to the base mud, which pushes forward their future development.

  18. Basic Land Drills for Swimming Stroke Acquisition

    Science.gov (United States)

    Zhang, Peng

    2014-01-01

    Teaching swimming strokes can be a challenging task in physical education. The purpose of the article is to introduce 12 on land drills that can be utilized to facilitate the learning of swimming strokes, including elementary back stroke, sidestroke, front crawl, back stroke, breaststroke, and butterfly. Each drill consists of four components…

  19. Status Report A Review of Slimhole Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Tao; Carroll, Herbert B.

    1994-09-01

    This 1994 report reviews the various applications of slimhole technology including for exploration in remote areas, low-cost development wells, reentering existing wells, and horizontal and multilateral drilling. Advantages of slimholes to regular holes are presented. Limitations and disadvantages of slimholes are also discussed. In 1994, slimhole drilling was still an ongoing development technology. (DJE 2005)

  20. Westinghouse GOCO conduct of casualty drills

    International Nuclear Information System (INIS)

    Ames, C.P.

    1996-02-01

    Purpose of this document is to provide Westinghouse Government Owned Contractor Operated (GOCO) Facilities with information that can be used to implement or improve drill programs. Elements of this guide are highly recommended for use when implementing a new drill program or when assessing an existing program. Casualty drills focus on response to abnormal conditions presenting a hazard to personnel, environment, or equipment; they are distinct from Emergency Response Exercises in which the training emphasis is on site, field office, and emergency management team interaction. The DOE documents which require team training and conducting drills in nuclear facilities and should be used as guidance in non-nuclear facilities are: DOE 5480.19 (Chapter 1 of Attachment I) and DOE 5480.20 (Chapter 1, paragraphs 7 a. and d. of continuing training). Casualty drills should be an integral part of the qualification and training program at every DOE facility

  1. Lifting device for drilling rods

    Energy Technology Data Exchange (ETDEWEB)

    Radzivilovich, L L; Laptev, A G; Lipkovich, V A

    1982-01-01

    A lifter is proposed for drilling rods including a spacer stand with rotating bracket, boom with by-pass rollers, spacing and lifting hydrocylinders with rods and flexible tie mechanism. In order to improve labor productivity by improving maneuverability and to increase the maintenance zone, the lifter is equipped with a hydrocylinder of advance and a cross piece which is installed with the possibility of forward and rotational movement on the stand, and in which by means of the hydrocylinder of advance a boom is attached. Within the indicated boom there is a branch of the flexible tie mechanism with end attached with the possibility of regulation over the length on a rotating bracket, while the rod of the lifting hydrocylinder is connected to the cross piece.

  2. Drilling the North Anatolian Fault

    Directory of Open Access Journals (Sweden)

    Mustafa Aktar

    2008-07-01

    Full Text Available An international workshop entitled “GONAF: A deep Geophysical Observatory at the North Anatolian Fault”, was held 23–27 April 2007 in Istanbul, Turkey. The aim of this workshop was to refine plans for a deep drilling project at the North Anatolian Fault Zone (NAFZ in northwestern Turkey. The current drilling target is located in the Marmara Sea offshore the megacity of Istanbul in the direct vicinity of the main branch of the North Anatolian Fault on the PrinceIslands (Figs. 1 and 2.The NAFZ represents a 1600-km-long plate boundary that slips at an average rate of 20–30 mm·yr-1 (McClusky et al., 2000. It has developed in the framework of the northward moving Arabian plate and the Hellenic subduction zone where the African lithosphere is subducting below the Aegean. Comparison of long-term slip rates with Holocene and GPS-derived slip rates indicate an increasing westwardmovement of the Anatolian plate with respect to stable Eurasia. During the twentieth century, the NAFZ has ruptured over 900 km of its length. A series of large earthquakes starting in 1939 near Erzincan in Eastern Anatolia propagated westward towards the Istanbul-Marmara region in northwestern Turkey that today represents a seismic gap along a ≥100-km-long segment below the Sea of Marmara. This segment did not rupture since 1766 and, if locked, may have accumulated a slip deficit of 4–5 m. It is believed being capable of generating two M≥7.4 earthquakes within the next decades (Hubert-Ferrari et al., 2000; however, it could even rupture in a large single event (Le Pichon et al., 1999.

  3. A calibration rig for multi-component internal strain gauge balance using the new design-of-experiment (DOE) approach

    Science.gov (United States)

    Nouri, N. M.; Mostafapour, K.; Kamran, M.

    2018-02-01

    In a closed water-tunnel circuit, the multi-component strain gauge force and moment sensor (also known as balance) are generally used to measure hydrodynamic forces and moments acting on scaled models. These balances are periodically calibrated by static loading. Their performance and accuracy depend significantly on the rig and the method of calibration. In this research, a new calibration rig was designed and constructed to calibrate multi-component internal strain gauge balances. The calibration rig has six degrees of freedom and six different component-loading structures that can be applied separately and synchronously. The system was designed based on the applicability of formal experimental design techniques, using gravity for balance loading and balance positioning and alignment relative to gravity. To evaluate the calibration rig, a six-component internal balance developed by Iran University of Science and Technology was calibrated using response surface methodology. According to the results, calibration rig met all design criteria. This rig provides the means by which various methods of formal experimental design techniques can be implemented. The simplicity of the rig saves time and money in the design of experiments and in balance calibration while simultaneously increasing the accuracy of these activities.

  4. Toscana virus NSs protein inhibits the induction of type I interferon by interacting with RIG-I.

    Science.gov (United States)

    Gori-Savellini, Gianni; Valentini, Melissa; Cusi, Maria Grazia

    2013-06-01

    Toscana virus (TOSV) is a phlebovirus, of the Bunyaviridae family, that is responsible for central nervous system (CNS) injury in humans. Previous data have shown that the TOSV NSs protein is a gamma interferon (IFN-β) antagonist when transiently overexpressed in mammalian cells, inhibiting IRF-3 induction (G. Gori Savellini, F. Weber, C. Terrosi, M. Habjan, B. Martorelli, and M. G. Cusi, J. Gen. Virol. 92:71-79, 2011). In this study, we investigated whether an upstream sensor, which has a role in the signaling cascade leading to the production of type I IFN, was involved. We found a significant decrease in RIG-I protein levels in cells overexpressing TOSV NSs, suggesting that the nonstructural protein interacts with RIG-I and targets it for proteasomal degradation. In fact, the MG-132 proteasome inhibitor was able to restore IFN-β promoter activation in cells expressing NSs, demonstrating the existence of an evasion mechanism based on inhibition of the RIG-I sensor. Furthermore, a C-terminal truncated NSs protein (ΔNSs), although able to interact with RIG-I, did not affect the RIG-I-mediated IFN-β promoter activation, suggesting that the NSs domains responsible for RIG-I-mediated signaling and interaction with RIG-I are mapped on different regions. These results contribute to identify a novel mechanism for bunyaviruses by which TOSV NSs counteracts the early IFN response.

  5. Lake Eĺ gygytgyn Drilling under way: State of the operation and first results

    Science.gov (United States)

    Melles, M.; Brigham-Grette, J.; Minyuk, P.; Koeberl, C.; Scientific Party, EĺGygytgyn

    2009-04-01

    into the underlying impact breccia and brecciated bedrock in order to additionally investigate the impact process and the response of the volcanic bedrock to the impact event. The field season will continue into May, when surface melting on the lake will push to start evacuation of the drill rig. In summer 2009, the cores will be flown by chartered cargo plane to St. Petersburg. Later they will be trucked to the University of Cologne, Germany, for sub-sampling starting in September by the international team and their students. The archive core halves will be shipped to the University of Minnesota LacCore Facility in the US for post-moratorium studies. This talk will provide an introduction into the drilling objectives, summarize the first conclusions that can be drawn from the field data, and outline the next steps towards multidisciplinary investigation of the core material by the international science team.

  6. Study on Monitoring Rock Burst through Drill Pipe Torque

    OpenAIRE

    Zhonghua Li; Liyuan Zhu; Wanlei Yin; Yanfang Song

    2015-01-01

    This paper presents a new method to identify the danger of rock burst from the response of drill pipe torque during drilling process to overcome many defects of the conventional volume of drilled coal rubble method. It is based on the relationship of rock burst with coal stress and coal strength. Through theoretic analysis, the change mechanism of drill pipe torque and the relationship of drill pipe torque with coal stress, coal strength, and drilling speed are investigated. In light of the a...

  7. A Study on the Dynamic Analysis of the Nuclear Fuel Test Rig Using 1-Way Fluid-Structure Coupled Analysis

    International Nuclear Information System (INIS)

    Yang, Tae-Ho; Hong, Jin-Tae; Ahn, Sung-Ho; Joung, Chang-Young; Heo, Sung-Ho; Jang, Seo-Yun

    2015-01-01

    1-way fluid-structure coupled analysis is used to estimate the dynamic characteristic of the fuel test rig. the motion at the bottom of the test rig is confirmed. The maximum deformation of the test rig is 0.11 mm. The structural integrity of the test rig is performed by using the comparison with the Von-mises stress of the analysis and yield stress of the material. It is evaluated that the motion at the bottom of the test rig is able to cause other structural problem. Using the 2-way fluid-structural coupled analysis, the structural integrity of the test rig will be performed in further paper. The cooling water with specific flow rate was flowed in the nuclear fuel test rig. The structural integrity of the test rig was affected by the vibration. The fluid-induced vibration test had to be performed to obtain the amplitude of the vibration on the structure. Various test systems was developed. Flow-induced vibration and pressure drop experimental tester was developed in Korea Atomic Energy Research Institute. The vibration test with high fluid flow rate was difficult by the tester. To generate the nuclear fuel test environment, coolant flow simulation system was developed. The scaled nuclear fuel test was able to be performed by the simulation system. The mock-up model of the test rig was used in the simulation system. The mock-up model in the simulation system was manufactured with scaled down full model. In this paper, the fluid induced vibration characteristic of the full model in the nuclear fuel test is studied. The hydraulic pressure on the velocity of the fluid was calculated. The static structure analysis was performed by using the pressure. The structural integrity was assessed using the results of the analysis

  8. Joint test rig for tests and calibration of different methods of two-phase mass flow measurement

    International Nuclear Information System (INIS)

    John, H.; Erbacher, F.; Wanner, E.

    1975-01-01

    On behalf of the Federal Ministry of Research and Technology, the Institute of Reactor Components (IRB) has begun building a test rig which will be used for testing and calibrating the methods of measuring non-steady state two-phase mass flows developed by various research agencies. The test rig is designed for the generation of steam-water mixtures of any mixing ratio and a maximum pressure of 160 data. Depending on the mixing ratio, the mass flow will reach a maximum level of 10 to 20 t/h. The conceptual design phase of the test rig has largely been finished, the component ordering phase has begun. (orig.) [de

  9. The Auto-Gopher Deep Drill

    Science.gov (United States)

    Badescu, Mircea

    2014-01-01

    Subsurface penetration by coring, drilling or abrading is of great importance for a large number of space and earth applications. An Ultrasonic/Sonic Drill/Corer (USDC) has been in development at JPL's Nondestructive Evaluation and Advanced Actuators (NDEAA) lab as an adaptable tool for many of these applications. The USDC uses a novel drive mechanism to transform the high frequency ultrasonic or sonic vibrations of the tip of a horn into a lower frequency sonic hammering of a drill bit through an intermediate free-flying mass. The USDC device idea has been implemented at various scales from handheld drills to large diameter coring devices. A series of computer programs that model the function and performance of the USDC device were developed and were later integrated into an automated modeling package. The USDC has also evolved from a purely hammering drill to a rotary hammer drill as the design requirements increased form small diameter shallow drilling to large diameter deep coring. A synthesis of the Auto-Gopher development is presented in this paper.

  10. Rock melting technology and geothermal drilling

    Science.gov (United States)

    Rowley, J. C.

    1974-01-01

    National awareness of the potential future shortages in energy resources has heightened interest in exploration and utilization of a variety of geothermal energy (GTE) reservoirs. The status of conventional drilling of GTE wells is reviewed briefly and problem areas which lead to higher drilling costs are identified and R and D directions toward solution are suggested. In the immediate future, an expanded program of drilling in GTE formations can benefit from improvements in drilling equipment and technology normally associated with oil or gas wells. Over a longer time period, the new rock-melting drill bits being developed as a part of the Los Alamos Scientific Laboratory's Subterrene Program offer new solutions to a number of problems which frequently hamper GTE drilling, including the most basic problem - high temperature. Two of the most favorable characteristics of rock-melting penetrators are their ability to operate effectively in hot rock and produce glass linings around the hole as an integral part of the drilling process. The technical advantages to be gained by use of rock-melting penetrators are discussed in relation to the basic needs for GTE wells.

  11. Use of Cutting-Edge Horizontal and Underbalanced Drilling Technologies and Subsurface Seismic Techniques to Explore, Drill and Produce Reservoired Oil and Gas from the Fractured Monterey Below 10,000 ft in the Santa Maria Basin of California

    Energy Technology Data Exchange (ETDEWEB)

    George Witter; Robert Knoll; William Rehm; Thomas Williams

    2005-09-29

    This project was undertaken to demonstrate that oil and gas can be drilled and produced safely and economically from a fractured Monterey reservoir in the Santa Maria Basin of California by employing horizontal wellbores and underbalanced drilling technologies. Two vertical wells were previously drilled in this area with heavy mud and conventional completions; neither was commercially productive. A new well was drilled by the project team in 2004 with the objective of accessing an extended length of oil-bearing, high-resistivity Monterey shale via a horizontal wellbore, while implementing managed-pressure drilling (MPD) techniques to avoid formation damage. Initial project meetings were conducted in October 2003. The team confirmed that the demonstration well would be completed open-hole to minimize productivity impairment. Following an overview of the geologic setting and local field experience, critical aspects of the application were identified. At the pre-spud meeting in January 2004, the final well design was confirmed and the well programming/service company requirements assigned. Various design elements were reduced in scope due to significant budgetary constraints. Major alterations to the original plan included: (1) a VSP seismic survey was delayed to a later phase; (2) a new (larger) surface hole would be drilled rather than re-enter an existing well; (3) a 7-in. liner would be placed into the top of the Monterey target as quickly as possible to avoid problems with hole stability; (4) evaluation activities were reduced in scope; (5) geosteering observations for fracture access would be deduced from penetration rate, cuttings description and hydrocarbon in-flow; and (6) rather than use nitrogen, a novel air-injection MPD system was to be implemented. Drilling operations, delayed from the original schedule by capital constraints and lack of rig availability, were conducted from September 12 to November 11, 2004. The vertical and upper curved sections were

  12. Offshore waste management monitoring system: drilling campaign BM-CAL-4 Block, Camanu-Almada Basin, Bahia, Brazil; Gestao de rejeitos offshore em areas sensiveis e ambientes isolados - estudo de caso: campanha exploratoria da El Paso no Bloco BM-CA-4, Bacia de Camamu-Almada, Bahia, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ranieri, Adriano [El Paso Oleo e Gas, Natal, RN (Brazil); Perez, Pedro; Andrade, Albert [EnvironPact, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The present paper addresses the principal aspects related to the difficulties found to implement a pollution control project in sensitive areas and isolated environments. For that, it was utilized a case study on the El Paso's second exploratory campaign on BM-CAL-4 Block, located in Camamu Almada Basin, Bahia - Brazil. Two of the items of the pollution control project implemented on this campaign where herein detailed: drilling wastes management and waste management on the smaller vessels, which had to attend to the same requirements applied to the supply vessels and the drilling rig, due to the discharge restrictions established by the environmental agency. (author)

  13. Fatigue analysis of aluminum drill pipes

    Directory of Open Access Journals (Sweden)

    João Carlos Ribeiro Plácido

    2005-12-01

    Full Text Available An experimental program was performed to investigate the fundamental fatigue mechanisms of aluminum drill pipes. Initially, the fatigue properties were determined through small-scale tests performed in an optic-mechanical fatigue apparatus. Additionally, full-scale fatigue tests were carried out with three aluminum drill pipe specimens under combined loading of cyclic bending and constant axial tension. Finally, a finite element model was developed to simulate the stress field along the aluminum drill pipe during the fatigue tests and to estimate the stress concentration factors inside the tool joints. By this way, it was possible to estimate the stress values in regions not monitored during the fatigue tests.

  14. Hydraulic lifter of a drilling unit

    Energy Technology Data Exchange (ETDEWEB)

    Velikovskiy, L S; Demin, A V; Shadchinov, L M

    1979-01-08

    The invention refers to drilling equipment, in particular, devices for lowering and lifting operations during drilling. A hydraulic lifter of the drilling unit is suggested which contains a hydraulic cylinder, pressure line and hollow plunger whose cavities are hydraulically connected. In order to improve the reliability of the hydraulic lifter by balancing the forces of compression in the plunger of the hydraulic cylinder, a closed vessel is installed inside the plunger and rigidly connected to its ends. Its cavity is hydraulically connected to the pressure line.

  15. The Hydraulic Test Procedure for Non-instrumented Irradiation Test Rig of Annular Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Ho; Lee, Kang Hee; Shin, Chang Hwan; Park, Chan Kook

    2008-08-15

    This report presents the procedure of pressure drop test, vibration test and endurance test for the non-instrumented rig using the irradiation test in HANARO of advanced PWR annular fuel which were designed and fabricated by KAERI. From the out-pile thermal hydraulic tests, confirm the flow rate at the 200 kPa pressure drop and measure the RMS displacement at this time. And the endurance test is confirmed the wear and the integrity of the non-instrumented rig at the 110% design flow rate. This out-pile test perform the Flow-Induced Vibration and Pressure Drop Experimental Tester(FIVPET) facility. The instruments in FIVPET facility was calibrated in KAERI and the pump and the thermocouple were certified by manufacturer.

  16. A REAL TIME DECISION SUPPORT SYSTEM FOR THE ADJUSTMENT OF SAILBOAT RIGGING

    Directory of Open Access Journals (Sweden)

    Inmaculada Ortigosa

    2016-01-01

    Full Text Available The operational complexity and performance requirements of modern racing yachts demand the use of advanced applications, such as a decision support system (DSS able to assist crew members during navigation. In this article, the authors describe a near-time computational solver as the main piece of a DSS which analyses and monitors the behaviour of sails and rigging. The solver is made up of two different interconnected tools: an iterative Fluid-Structure Interaction algorithm and an advanced Wireless Sensor Network to monitor rigging. The real-time DSS quantifies crew manoeuvres in physical terms, which are reproduced by a simulation program. It can be used in the design phase of sailing yachts and as an aid for real-time boat performance optimisation and accident prevention. This novel DSS is a useful tool for navigation, especially in races.

  17. Control of two-phase erosion corrosion with the amine 5-aminopentanol: rig and plant trials

    International Nuclear Information System (INIS)

    Lewis, G.G.; Greene, J.C.; Tyldesley, J.D.; Wetton, E.A.M.; Fountain, M.J.

    1994-01-01

    Control of two-phase erosion corrosion in the once through mild steel boilers of the gas cooled nuclear power station at Wylfa was achieved by using the amine 2-amino, 2 methylpropan-1-ol (AMP). In a search to find a more cost effective amine, 5-aminopentanol (5-AP) emerged, from a laboratory based programme to determine basicity and volatility, as the most promising candidate. The effectiveness of 5-AP in controlling erosion corrosion was demonstrated in a rig test, carried out on a full scale replica of a Wylfa boiler tube. Following on from the rig test, a plant trial at Wylfa PS demonstrated 5-AP's superior thermal stability (compared to AMP). It also provided confirmation that the laboratory generated data on basicity and volatility was applicable to plant and hence also the accuracy of the figures for predicted amine usage. (orig.)

  18. Finite element calculation of fields around the end region of a turbine generator test rig

    Energy Technology Data Exchange (ETDEWEB)

    Eastham, J.F.; Rodger, D.; Lai, H.C.; Nouri, H. (Univ. of Bath (United Kingdom))

    1993-03-01

    Under transient conditions, most often caused by faults in the power system, unbalanced load is presented to a turbine generator. This gives rise to airgap fields which do not travel at the speed of the rotor, and cause induced currents which occur in the solid steel surface. This can cause high local heating. The current path is generally in the axial direction of the machine but the distribution in the end region is not so well known. Here, comparisons are drawn between the use of surface impedance elements and volume elements when modeling a test rig using the MEGA package. The test rig is representative of a turbine generator. The work is supported by practical measurements.

  19. Mechanical Design of a Performance Test Rig for the Turbine Air-Flow Task (TAFT)

    Science.gov (United States)

    Forbes, John C.; Xenofos, George D.; Farrow, John L.; Tyler, Tom; Williams, Robert; Sargent, Scott; Moharos, Jozsef

    2004-01-01

    To support development of the Boeing-Rocketdyne RS84 rocket engine, a full-flow, reaction turbine geometry was integrated into the NASA-MSFC turbine air-flow test facility. A mechanical design was generated which minimized the amount of new hardware while incorporating all test and instrumentation requirements. This paper provides details of the mechanical design for this Turbine Air-Flow Task (TAFT) test rig. The mechanical design process utilized for this task included the following basic stages: Conceptual Design. Preliminary Design. Detailed Design. Baseline of Design (including Configuration Control and Drawing Revision). Fabrication. Assembly. During the design process, many lessons were learned that should benefit future test rig design projects. Of primary importance are well-defined requirements early in the design process, a thorough detailed design package, and effective communication with both the customer and the fabrication contractors.

  20. Threshold Assessment of Gear Diagnostic Tools on Flight and Test Rig Data

    Science.gov (United States)

    Dempsey, Paula J.; Mosher, Marianne; Huff, Edward M.

    2003-01-01

    A method for defining thresholds for vibration-based algorithms that provides the minimum number of false alarms while maintaining sensitivity to gear damage was developed. This analysis focused on two vibration based gear damage detection algorithms, FM4 and MSA. This method was developed using vibration data collected during surface fatigue tests performed in a spur gearbox rig. The thresholds were defined based on damage progression during tests with damage. The thresholds false alarm rates were then evaluated on spur gear tests without damage. Next, the same thresholds were applied to flight data from an OH-58 helicopter transmission. Results showed that thresholds defined in test rigs can be used to define thresholds in flight to correctly classify the transmission operation as normal.

  1. Initial report on drilling into seismogenic zones of M2.0 - M5.5 earthquakes from deep South African gold mines (DSeis)

    Science.gov (United States)

    Ogasawara, Hiroshi; Durrheim, Raymond; Yabe, Yasuo; Ito, Takatoshi; van Aswegen, Gerrie; Grobbelaar, Michelle; Funato, Akio; Ishida, Akimasa; Ogasawara, Hiroyuki; Mngadi, Siyanda; Manzi, Musa; Ziegler, Martin; Ward, Tony; Moyer, Pamela; Boettcher, Margaret; Ellsworth, Bill; Liebenberg, Bennie; Wechsler, Neta; Onstott, Tullis; Berset, Nicolas

    2017-04-01

    other holes at the M3.5 seismogenic zone. As we successfully conducted DCDA with the above-mentioned drilled core, we look forward to shedding light on spatial variations of stress in the seismogenic zones following our ICDP DSeis drilling. A M5.5 earthquake which took place near Orkney, South Africa on 5 August 2014, offers a special opportunity to compare seismically inverted spatio-temporal evolution of both the main rupture and the aftershock activity with the information directly probed by the ICDP DSeis project. Moyer et al. (2016 Seismol. Res. Lett. submitted) calls for comparing seismic source models as part of a workshop proposed to the Southern California Earthquake Center for Fall 2017. In addition, the upper edge of the M5.5 rupture is located hundreds of meters below the mining horizon, sufficiently away from anthropogenic activity. This allows geomicrobiologists to investigate deep microbiological activity fueled by H2 from seismic rupture to address questions about Earth's early life. Drilling machines are being rigged underground soon to kick off our ICDP DSeis drilling in early 2017.

  2. A thermal-hydraulic test rig for advanced fast reactor fuel assemblies

    International Nuclear Information System (INIS)

    Rapier, A.C.

    1989-03-01

    A new design of fast reactor fuel assemblies has been proposed in which the pins are supported in grids attached to the wrapper by flexible skirts. Coolant mixing is enhanced by the skirts diverting flow into the cluster of pins at each grid. There are insufficient empirical data available for the detailed design of the skirt or for the input to computer calculations of flow and heat transfer. A test rig to provide these data has been designed and built. (author)

  3. Design of Seismic Test Rig for Control Rod Drive Mechanism of Jordan Research and Training Reactor

    International Nuclear Information System (INIS)

    Sun, Jongoh; Kim, Gyeongho; Yoo, Yeonsik; Cho, Yeonggarp; Kim, Jong In

    2014-01-01

    The reactor assembly is submerged in a reactor pool filled with water and its reactivity is controlled by locations of four control absorber rods(CARs) inside the reactor assembly. Each CAR is driven by a stepping motor installed at the top of the reactor pool and they are connected to each other by a tie rod and an electromagnet. The CARs scram the reactor by de-energizing the electromagnet in the event of a safe shutdown earthquake(SSE). Therefore, the safety function of the control rod drive mechanism(CRDM) which consists of a drive assembly, tie rod and CARs is to drop the CAR into the core within an appropriate time in case of the SSE. As well known, the operability for complex equipment such as the CRDM during an earthquake is very hard to be demonstrated by analysis and should be verified through tests. One of them simulates the reactor assembly and the guide tube of the CAR, and the other one does the pool wall where the drive assembly is installed. In this paper, design of the latter test rig and how the test is performed are presented. Initial design of the seismic test rig and excitation table had its first natural frequency at 16.3Hz and could not represent the environment where the CRDM was installed. Therefore, experimental modal analyses were performed and an FE model for the test rig and table was obtained and tuned based on the experimental results. Using the FE model, the design of the test rig and table was modified in order to have higher natural frequency than the cutoff frequency. The goal was achieved by changing its center of gravity and the stiffness of its sliding bearings

  4. Design of Seismic Test Rig for Control Rod Drive Mechanism of Jordan Research and Training Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Jongoh; Kim, Gyeongho; Yoo, Yeonsik; Cho, Yeonggarp; Kim, Jong In [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    The reactor assembly is submerged in a reactor pool filled with water and its reactivity is controlled by locations of four control absorber rods(CARs) inside the reactor assembly. Each CAR is driven by a stepping motor installed at the top of the reactor pool and they are connected to each other by a tie rod and an electromagnet. The CARs scram the reactor by de-energizing the electromagnet in the event of a safe shutdown earthquake(SSE). Therefore, the safety function of the control rod drive mechanism(CRDM) which consists of a drive assembly, tie rod and CARs is to drop the CAR into the core within an appropriate time in case of the SSE. As well known, the operability for complex equipment such as the CRDM during an earthquake is very hard to be demonstrated by analysis and should be verified through tests. One of them simulates the reactor assembly and the guide tube of the CAR, and the other one does the pool wall where the drive assembly is installed. In this paper, design of the latter test rig and how the test is performed are presented. Initial design of the seismic test rig and excitation table had its first natural frequency at 16.3Hz and could not represent the environment where the CRDM was installed. Therefore, experimental modal analyses were performed and an FE model for the test rig and table was obtained and tuned based on the experimental results. Using the FE model, the design of the test rig and table was modified in order to have higher natural frequency than the cutoff frequency. The goal was achieved by changing its center of gravity and the stiffness of its sliding bearings.

  5. Coxsackievirus cloverleaf RNA containing a 5' triphosphate triggers an antiviral response via RIG-I activation.

    Directory of Open Access Journals (Sweden)

    Qian Feng

    Full Text Available Upon viral infections, pattern recognition receptors (PRRs recognize pathogen-associated molecular patterns (PAMPs and stimulate an antiviral state associated with the production of type I interferons (IFNs and inflammatory markers. Type I IFNs play crucial roles in innate antiviral responses by inducing expression of interferon-stimulated genes and by activating components of the adaptive immune system. Although pegylated IFNs have been used to treat hepatitis B and C virus infections for decades, they exert substantial side effects that limit their use. Current efforts are directed toward the use of PRR agonists as an alternative approach to elicit host antiviral responses in a manner similar to that achieved in a natural infection. RIG-I is a cytosolic PRR that recognizes 5' triphosphate (5'ppp-containing RNA ligands. Due to its ubiquitous expression profile, induction of the RIG-I pathway provides a promising platform for the development of novel antiviral agents and vaccine adjuvants. In this study, we investigated whether structured RNA elements in the genome of coxsackievirus B3 (CVB3, a picornavirus that is recognized by MDA5 during infection, could activate RIG-I when supplied with 5'ppp. We show here that a 5'ppp-containing cloverleaf (CL RNA structure is a potent RIG-I inducer that elicits an extensive antiviral response that includes induction of classical interferon-stimulated genes, as well as type III IFNs and proinflammatory cytokines and chemokines. In addition, we show that prophylactic treatment with CVB3 CL provides protection against various viral infections including dengue virus, vesicular stomatitis virus and enterovirus 71, demonstrating the antiviral efficacy of this RNA ligand.

  6. The Hydraulic Test Report for Non-instrumented Irradiation Test Rig of DUO-Cooled Annular Pellet

    International Nuclear Information System (INIS)

    Kim, Dae Ho; Lee, Kang Hee; Shin, Chang Hwan; Yang, Yong Sik; Kim, Sun Ki; Bang, Je Geon; Song, Kun Woo

    2007-08-01

    This report presents the results of pressure drop test and vibration test for non-instrumented rig of Advanced PWR DUO-Fuel Annular Pellet which were designed and fabricated by KAERI. From the pressure drop test results, it is noted that the flow velocity across the non-instrumented rig of Advanced PWR DUO-Fuel Annular Pellet corresponding to the pressure drop of 200 kPa is measured to be about 8.30 kg/sec. Vibration frequency results for the non-instrumented rig at the pump spin frequency ranges from 19.0 to 32.0 Hz, RMS(Root Mean Square) displacement for the non-instrumented rig of Advanced PWR DUO-Fuel Annular Pellet is less than 7.25 m, and the maximum displacement is less than 31.27 μm. This test was performed at the FIVPET facility

  7. Cloning of low dose radiation induced gene RIG1 by RACE based on non-cloned cDNA library

    International Nuclear Information System (INIS)

    Luo Ying; Sui Jianli; Tie Yi; Zhang Yuanping; Zhou Pingkun; Sun Zhixian

    2001-01-01

    Objective: To obtain full-length cDNA of radiation induced new gene RIG1 based on its EST fragment. Methods: Based on non-cloned cDNA library, enhanced nested RACE PCR and biotin-avidin labelled probe for magnetic bead purification was used to obtain full-length cDNA of RIG1. Results: About 1 kb of 3' end of RIG1 gene was successfully cloned by this set of methods and cloning of RIG1 5' end is proceeding well. Conclusion: The result is consistent with the design of experiment. This set of protocol is useful for cloning of full-length gene based on EST fragment

  8. Clay-free drilling mud

    Energy Technology Data Exchange (ETDEWEB)

    Akhmadeyev, R G; Panov, V B; Simonenkov, O I

    1982-01-01

    A clay-free drilling mud is proposed which contains humate-containing substance, alkali electrolyte, gel-former, inhibitor and water. In order to reduce viscosity of the static shear stress and water output under conditions of polyvalent aggression, it additionally contains organic stabilizer with the following ratio of components, % by mass: humate-containing substance 4.0-8.0; alkali electrolyte 0.2-1.5; gel-former 1.0-3.0; organic stabilizer 0.1-1.0; inhibitor 1.0-40.0; water--the rest. The solution is also distinguished by the fact that the gel-former used is magnesium chloride or magnesium sulfate, or calcium chloride or aluminum sulfate, or iron chloride (III) or iron sulfate (II) or waste of chlorides of titanium production with average chemical composition, % by mass: Ti 1.5-7.0; Fe 5.0-15.0; Al 1.5-10.0; Na 5.0-16.0; Mg 0.5-3.0; Cl 30.0-60.0; Ca 0.2-2.0; Cr 0.2-2.0; Cu 0.2-1.5.

  9. Alteration in the IRDP drill hole compared with other drill holes in Iceland

    Science.gov (United States)

    Kristmannsdóttir, Hrefna

    1982-08-01

    The overall alteration pattern in the drill hole at Reydarfjördur is very similar to alteration patterns observed in Icelandic geothermal areas and in low-grade metamorphosed basalts in deep crustal sections elsewhere in Iceland. However more detail is obtained by the study of the IRDP drill core than by study of drill cuttings sampled in previous drill holes in Iceland. A comparatively high fossil thermal gradient is obtained at Reydarfjördur by a combination of mineral stability data and the observed occurence of secondary minerals. This high gradient is consistent with the measured dike dilation at the drill site and the location of the drill site adjacent to a central volcano.

  10. Design and construction of a point-contact spectroscopy rig with lateral scanning capability

    Energy Technology Data Exchange (ETDEWEB)

    Tortello, M. [Dipartimento di Scienza Applicata e Tecnologia, Politecnico di Torino, Torino 10129 (Italy); Park, W. K., E-mail: wkpark@illinois.edu; Ascencio, C. O.; Saraf, P.; Greene, L. H. [Department of Physics and Materials Research Laboratory, University of Illinois at Urbana-Champaign, Urbana, Illinois 61801 (United States)

    2016-06-15

    The design and realization of a cryogenic rig for point-contact spectroscopy measurements in the needle-anvil configuration is presented. Thanks to the use of two piezoelectric nano-positioners, the tip can move along the vertical (z) and horizontal (x) direction and thus the rig is suitable to probe different regions of a sample in situ. Moreover, it can also form double point-contacts on different facets of a single crystal for achieving, e.g., an interferometer configuration for phase-sensitive measurements. For the later purpose, the sample holder can also host a Helmholtz coil for applying a small transverse magnetic field to the junction. A semi-rigid coaxial cable can be easily added for studying the behavior of Josephson junctions under microwave irradiation. The rig can be detached from the probe and thus used with different cryostats. The performance of this new probe has been tested in a Quantum Design PPMS system by conducting point-contact Andreev reflection measurements on Nb thin films over large areas as a function of temperature and magnetic field.

  11. Hot corrosion testing of Ni-based alloys and coatings in a modified Dean rig

    Science.gov (United States)

    Steward, Jason Reid

    Gas turbine blades are designed to withstand a variety of harsh operating conditions. Although material and coating improvements are constantly administered to increase the mean time before turbine refurbishment or replacement, hot corrosion is still considered as the major life-limiting factor in many industrial and marine gas turbines. A modified Dean rig was designed and manufactured at Tennessee Technological University to simulate the accelerated hot corrosion conditions and to conduct screening tests on the new coatings on Ni-based superalloys. Uncoated Ni-based superalloys, Rene 142 and Rene 80, were tested in the modified Dean rig to establish a testing procedure for Type I hot corrosion. The influence of surface treatments on the hot corrosion resistance was then investigated. It was found that grit-blasted specimens showed inferior hot corrosion resistance than that of the polished counterpart. The Dean rig was also used to test model MCrAlY alloys, pack cementation NiAl coatings, and electro-codeposited MCrAlY coatings. Furthermore, the hot corrosion attack on the coated-specimens were also assessed using a statistical analysis approach.

  12. A universal suspension test rig for electrohydraulic active and passive automotive suspension system

    Directory of Open Access Journals (Sweden)

    Mahmoud Omar

    2017-12-01

    Full Text Available A fully active electro-hydraulic and passive automotive quarter car suspensions with their experimental test-rigs are designed and implemented. Investigation of the active performance compared against the passive is performed experimentally and numerically utilizing SIMULINK's Simscape library. Both systems are modeled as single-degree-of-freedom in order to simplify the validation process. Economic considerations were considered during the rig's implementation. The rig consists of two identical platforms fixed side by side allowing testing two independent suspensions simultaneously. Position sensors for sprung and unsprung masses on both platforms are installed. The road input is introduced by a cam and a roller follower mechanism driven by 1.12 kW single phase induction motor with speed reduction assembly. The active hydraulic cylinder was the most viable choice due to its high power-to-weight ratio. The active control is of the proportional-integral-differential (PID type. Though this technique is quite simple and not new, yet the emphasis of this paper is the engineering, design and implementation of the experimental setup and controller. A successful validation process is performed. Ride comfort significantly improved with active suspension, as shown by the results; 24.8% sprung mass vibration attenuation is achieved. The details of the developed system with the analytical and experimental results are presented. Keywords: Active suspension, Passive suspension, Servo, Hydraulic, Control, PID

  13. An in situ thermo-mechanical rig for lattice strain measurement during creep using neutron diffraction

    Science.gov (United States)

    Wang, Y. Q.; Kabra, S.; Zhang, S. Y.; Truman, C. E.; Smith, D. J.

    2018-05-01

    A long-term high-temperature testing stress rig has been designed and fabricated for performing in situ neutron diffraction tests at the ENGIN-X beamline, ISIS facility in the UK. It is capable of subjecting metals to high temperatures up to 800 °C and uniaxial loading under different boundary conditions including constant load, constant strain, and elastic follow-up, each with minimum of external control. Samples are held horizontally between grips and connected to a rigid rig frame, a soft aluminium bar, and a stepper motor with forces up to 20 kN. A new three zone split electrical resistance furnace which generates a stable and uniform heat atmosphere over 200 mm length was used to heat the samples. An 8 mm diameter port at 45° to the centre of the furnace was made in order to allow the neutron beam through the furnace to illuminate the sample. The entire instrument is mounted on the positioner at ENGIN-X and has the potential ability to operate continuously while being moved in and out of the neutron diffraction beam. The performance of the rig has been demonstrated by tracking the evolution of lattice strains in type 316H stainless steel under elastic follow-up control at 550 °C.

  14. Analysis and modification of a single-mesh gear fatigue rig for use in diagnostic studies

    Science.gov (United States)

    Zakrajsek, James J.; Townsend, Dennis P.; Oswald, Fred B.; Decker, Harry J.

    1992-01-01

    A single-mesh gear fatigue rig was analyzed and modified for use in gear mesh diagnostic research. The fatigue rig allowed unwanted vibration to mask the test-gear vibration signal, making it difficult to perform diagnostic studies. Several possible sources and factors contributing to the unwanted components of the vibration signal were investigated. Sensor mounting location was found to have a major effect on the content of the vibration signal. In the presence of unwanted vibration sources, modal amplification made unwanted components strong. A sensor location was found that provided a flatter frequency response. This resulted in a more useful vibration signal. A major network was performed on the fatigue rig to reduce the influence of the most probable sources of the noise in the vibration signal. The slave gears were machined to reduce weight and increase tooth loading. The housing and the shafts were modified to reduce imbalance, looseness, and misalignment in the rotating components. These changes resulted in an improved vibration signal, with the test-gear mesh frequency now the dominant component in the signal. Also, with the unwanted sources eliminated, the sensor mounting location giving the most robust representation of the test-gear meshing energy was found to be at a point close to the test gears in the load zone of the bearings.

  15. Accelerated Bearing Life-time Test Rig Development for Low Speed Data Acquisition

    Directory of Open Access Journals (Sweden)

    Andreas Klausen

    2017-07-01

    Full Text Available Condition monitoring plays an important role in rotating machinery to ensure reliability of the equipment, and to detect fault conditions at an early stage. Although health monitoring methodologies have been thoroughly developed for rotating machinery, low-speed conditions often pose a challenge due to the low signal-to-noise ratio. To this aim, sophisticated algorithms that reduce noise and highlight the bearing faults are necessary to accurately diagnose machines undergoing this condition. In the development phase, sensor data from a healthy and damaged bearing rotating at low-speed is required to verify the performance of such algorithms. A test rig for performing accelerated life-time testing of small rolling element bearings is designed to collect necessary sensor data. Heavy loads at high-speed conditions are applied to the test bearing to wear it out fast. Sensor data is collected in intervals during the test to capture the degeneration features. The main objective of this paper is to provide a detailed overview for the development and analysis of this test rig. A case study with experimental vibration data is also presented to illustrate the efficacy of the developed test rig.

  16. Propagation of Measurement-While-Drilling Mud Pulse during High Temperature Deep Well Drilling Operations

    OpenAIRE

    Li, Hongtao; Meng, Yingfeng; Li, Gao; Wei, Na; Liu, Jiajie; Ma, Xiao; Duan, Mubai; Gu, Siman; Zhu, Kuanliang; Xu, Xiaofeng

    2013-01-01

    Signal attenuates while Measurement-While-Drilling (MWD) mud pulse is transmited in drill string during high temperature deep well drilling. In this work, an analytical model for the propagation of mud pulse was presented. The model consists of continuity, momentum, and state equations with analytical solutions based on the linear perturbation analysis. The model can predict the wave speed and attenuation coefficient of mud pulse. The calculated results were compared with the experimental dat...

  17. Test report for core drilling ignitability testing

    International Nuclear Information System (INIS)

    Witwer, K.S.

    1996-01-01

    Testing was carried out with the cooperation of Westinghouse Hanford Company and the United States Bureau of Mines at the Pittsburgh Research Center in Pennsylvania under the Memorandum of Agreement 14- 09-0050-3666. Several core drilling equipment items, specifically those which can come in contact with flammable gasses while drilling into some waste tanks, were tested under conditions similar to actual field sampling conditions. Rotary drilling against steel and rock as well as drop testing of several different pieces of equipment in a flammable gas environment were the specific items addressed. The test items completed either caused no ignition of the gas mixture, or, after having hardware changes or drilling parameters modified, produced no ignition in repeat testing

  18. Logging-while-drilling (LWD) pressure test

    Energy Technology Data Exchange (ETDEWEB)

    Thirud, Aase P.

    2003-07-01

    Statoil and Halliburton have completed a successful test of a new ground-breaking formation evaluation technology on the Norwegian shelf. An LWD formation tester, the GeoTapTM sensor, was used to quantify formation pressure during drilling operations. The inaugural job was completed by Halliburton's Sperry-Sun product service line onboard the Bideford Dolphin at the Borg Field while drilling a horizontal production well in the Vigdis Extension development. The GeoTap tool, part of Sperry-Sun's StellarTM MWD/LWT suite, was run in combination with a complete logging-while-drilling sensor package and the Geo-Pilot rotary steerable drilling system. Repeat formation pressures were taken and successfully transmitted to surface. This is the first time this type of technology has been successfully applied on the Norwegian shelf.

  19. Drilling and logging in uranium exploration

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The report reviews drilling and logging practices in exploration of uranium ores and summarizes the papers presented in the panel meeting. Recommendations for further research and development are given

  20. HORIZONTAL WELL DRILL-IN FLUIDS

    Directory of Open Access Journals (Sweden)

    Nediljka Gaurina-Međimurec

    1998-12-01

    Full Text Available Main objective of horizontal driling is to place a drain-hole for a long distance within the pay zone to enhance productivity or injectivity. In drilling horizontal wells, more serious problems appear than in drilling vertical wells. These problems are: poor hole cleaning, excessive torque and drag, hole filling, pipe stucking, wellbore instability, loss of circulation, formation damage, poor cement job, and difficulties at logging jobs. From that reason, successful drilling and production of horizontal well depends largely on the fluid used during drilling and completion phases. Several new fluids, that fulfill some or all of required properties (hole cleaning, cutting suspension, good lubrication, and relative low formation damage, are presented in this paper.

  1. An elevator for locked drilling pipes

    Energy Technology Data Exchange (ETDEWEB)

    Gurbanov, R.S.; Abbasov, E.M.; Ismailov, A.A.; Mamedov, Yu.S.; Safarov, A.A.

    1983-01-01

    An elevator is proposed, which includes a body with a door. To reduce the probability of gas shows in a well with high speed lowering and lifting of the column of locked drilling pipes through providing the possibility of feeding a drilling mud in this case into the mine, the elevator is equipped with a pneumatic cylinder with a two way hollow rod, on one face of which a sealing element is mounted for sealing the drilling pipe and on the other, an adapter for feeding the drilling mud. The rod is linked with the sleeve of the pneumatic cylinder, which is rigidly linked with the body with the capability of axial movement without rotation.

  2. Environment-friendly drilling operation technology

    Science.gov (United States)

    Luo, Huaidong; Jing, Ning; Zhang, Yanna; Huang, Hongjun; Wei, Jun

    2017-01-01

    Under the circumstance that international safety and environmental standards being more and more stringent, drilling engineering is facing unprecedented challenges, the extensive traditional process flow is no longer accepted, the new safe and environment-friendly process is more suitable to the healthy development of the industry. In 2015, CNPCIC adopted environment-friendly drilling technology for the first time in the Chad region, ensured the safety of well control, at the same time increased the environmental protection measure, reduced the risk of environmental pollution what obtain the ratification from local government. This technology carries out recovery and disposal of crude oil, cuttings and mud without falling on the ground. The final products are used in road and well site construction, which realizes the reutilization of drilling waste, reduces the operating cost, and provides a strong technical support for cost-cutting and performance-increase of drilling engineering under low oil price.

  3. Ocean Drilling Program: Web Site Access Statistics

    Science.gov (United States)

    web site ODP/TAMU Science Operator Home Ocean Drilling Program Web Site Access Statistics* Overview See statistics for JOIDES members. See statistics for Janus database. 1997 October November December

  4. Stratigraphy in Apollo 16 drill section 60002

    Science.gov (United States)

    Blanford, G. E.; Morrison, D. A.

    1976-01-01

    Contacts in drill stem 60002 which indicate layers at least several centimeters thick and with one firm age of about 2.5 x 10 to the 7th yr are observed on the basis of characteristic patterns of track density variation with depth from the contact. The patterns can be observed primarily because the drill stem has a large immature component (path II soils).

  5. A reagent for processing drilling muds

    Energy Technology Data Exchange (ETDEWEB)

    Polyakov, G.A.; Khon-Pak, A.T.; Khon, A.V.; Normatov, L.N.; Telegin, B.V.

    1983-01-01

    A reagent is proposed for processing drilling muds. It contains an acrylic polymer and potassium permanganate. The reagent is distinguished by the fact that in order to improve the quality of the drilling muds by increasing their salt resistance, the reagent contains hydrolized nitron fiber as the acrylic polymer with the following component relationship (in percent by weight): potassium permanganate, 0.015 to 0.065 and hydrolyzed nitron fiber, the remainder.

  6. The Newberry Deep Drilling Project (NDDP)

    Science.gov (United States)

    Bonneville, A.; Cladouhos, T. T.; Petty, S.; Schultz, A.; Sorle, C.; Asanuma, H.; Friðleifsson, G. Ó.; Jaupart, C. P.; Moran, S. C.; de Natale, G.

    2017-12-01

    We present the arguments to drill a deep well to the ductile/brittle transition zone (T>400°C) at Newberry Volcano, central Oregon state, U.S.A. The main research goals are related to heat and mass transfer in the crust from the point of view of natural hazards and geothermal energy: enhanced geothermal system (EGS supercritical and beyond-brittle), volcanic hazards, mechanisms of magmatic intrusions, geomechanics close to a magmatic system, calibration of geophysical imaging techniques and drilling in a high temperature environment. Drilling at Newberry will bring additional information to a very promising field of research initiated by ICDP in the Deep Drilling project in Iceland with IDDP-1 on Krafla in 2009, followed by IDDP-2 on the Reykjanes ridge in 2016, and the future Japan Beyond-Brittle project and Krafla Magma Testbed. Newberry Volcano contains one of the largest geothermal heat reservoirs in the western United States, extensively studied for the last 40 years. All the knowledge and experience collected make this an excellent choice for drilling a well that will reach high temperatures at relatively shallow depths (< 5000 m). The large conductive thermal anomaly (320°C at 3000 m depth), has already been well-characterized by extensive drilling and geophysical surveys. This will extend current knowledge from the existing 3000 m deep boreholes at the sites into and through the brittle-ductile transition approaching regions of partial melt like lateral dykes. The important scientific questions that will form the basis of a full drilling proposal, have been addressed during an International Continental Drilling Program (ICDP) workshop held in Bend, Oregon in September 2017. They will be presented and discussed as well as the strategic plan to address them.

  7. Percussive Augmenter of Rotary Drills for Operating as a Rotary-Hammer Drill

    Science.gov (United States)

    Aldrich, Jack Barron (Inventor); Bar-Cohen, Yoseph (Inventor); Sherrit, Stewart (Inventor); Badescu, Mircea (Inventor); Bao, Xiaoqi (Inventor); Scott, James Samson (Inventor)

    2014-01-01

    A percussive augmenter bit includes a connection shaft for mounting the bit onto a rotary drill. In a first modality, an actuator percussively drives the bit, and an electric slip-ring provides power to the actuator while being rotated by the drill. Hammering action from the actuator and rotation from the drill are applied directly to material being drilled. In a second modality, a percussive augmenter includes an actuator that operates as a hammering mechanism that drives a free mass into the bit creating stress pulses that fracture material that is in contact with the bit.

  8. A self propelled drilling system for hard-rock, horizontal and coiled tube drilling

    Energy Technology Data Exchange (ETDEWEB)

    Biglin, D.; Wassell, M.

    1997-12-31

    Several advancements are needed to improve the efficiency and reliability of both hard rock drilling and extended reach drilling. This paper will present a Self Propelled Drilling System (SPDS) which can grip the borehole wall in order to provide a stable platform for the application of weight on bit (WOB) and resisting the reactive torque created by the downhole drilling motor, bit and formation interaction. The system will also dampen the damaging effects of drill string vibration. This tool employs two hydraulically activated anchors (front and rear) to grip the borehole wall, and a two-way thrust mandrel to apply both the drilling force to the bit, and a retraction force to pull the drill string into the hole. Forward drilling motion will commence by sequencing the anchor pistons and thrust mandrel to allow the tool to walk in a stepping motion. The SPDS has a microprocessor to control valve timing, sensing and communication functions. An optional Measurement While Drilling (MWD) interface can provide two-way communication of critical operating parameters such as hydraulic pressure and piston location. This information can then be telemetered to the surface, or used downhole to autonomously control system parameters such as anchor and thrust force or damping characteristics.

  9. Lifting devices with minimum effort for testing, maintenance and repair at the example of a lifting rig for core internals

    Energy Technology Data Exchange (ETDEWEB)

    Pache, Martin [Westinghouse Electric Germany GmbH (Germany); Wiesendanger, Robert [Kernkraftwerk Beznau, NOK (Switzerland)

    2008-07-01

    Beznau is a Westinghouse built nuclear power plant in the Aargau area Switzerland. It consists of two PWR units, each providing 365 MWe net capacity. The units were set into operation in 1969 and 1972, respectively, and hold an unlimited license for operation, provided they continue to fulfill current legal and security requirements. Beznau's previous lifting rigs for core internals required a high effort in testing and maintenance. Moreover, a damage to one of the rigs nearly resulted in the inoperability of the rig. However, no element of the load chain was affected, so there was no danger of a crash, but it could have caused an extended outage. Hence, it was decided to replace the lifting rigs with a state-of-the-art functional design that reflects modern requirements on maintenance and testing. Although the plant was built to ASME standards and codes, the new lifting rigs have been designed to German KTA code for lifting devices (KTA 3902 / 3903 for equipment with increased requirements, as per section 4.3 of KTA 3902). Given KTA's demands on periodic testing, one main requirement on the new design was to minimize the testing effort for the new rigs. (orig.)

  10. 30 CFR 56.7013 - Covering or guarding drill holes.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Covering or guarding drill holes. 56.7013 Section 56.7013 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Rotary Jet Piercing Drilling § 56.7013 Covering or guarding drill holes. Drill holes large enough to...

  11. 30 CFR 57.7013 - Covering or guarding drill holes.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Covering or guarding drill holes. 57.7013 Section 57.7013 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... and Rotary Jet Piercing Drilling-Surface Only § 57.7013 Covering or guarding drill holes. Drill holes...

  12. 30 CFR 250.463 - Who establishes field drilling rules?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Who establishes field drilling rules? 250.463... GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Other Drilling Requirements § 250.463 Who establishes field drilling rules? (a) The District Manager may...

  13. Thermal numerical assessment of jawbone drilling factor during implantology

    Directory of Open Access Journals (Sweden)

    Adel Pirjamali Neisiani

    2016-03-01

    Full Text Available Background and Aims: Optimization drilling parameters in order to temperature decrease during creation of hole in the bone is an interested issue. The aim of this study was to achieve optimum values of drilling parameters based on the creation of minimum temperature during jawbone drilling. Materials and Methods: In this study two models of mandible and maxilla was created and teeth 2, 5 and 8 from maxilla and teeth 25, 28 and 31 from mandible were removed. The drilling operation was performed under different conditions on jawbone models using finite element analysis and the maximum temperatures were measured in adjacent of holes. Results: Drill bit head angle of 70 degrees was created the lowest maximum temperature during drilling operation. The lowest maximum temperatures were observed in the drill bit rotational speed, drill bit feed rate and the force exerted on the drill bit equal to 200 rpm, 120 mm/min and 60 N, respectively. The use of irrigation can decrease the maximum bone temperature about 7ºC. The maximum temperature differences in various regions of mandible and maxilla were approximately about 1ºC. Conclusion: Sharpness of drill bit head angle, reduction of drill bit rotational speed, increasing drill bit feed rate and exerted force on drill bit and also the use of irrigation played effective roles in temperature decrease during jawbone drilling. Drilling site did not have important effect on the temperature changes during jawbone drilling.

  14. 21 CFR 872.4130 - Intraoral dental drill.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Intraoral dental drill. 872.4130 Section 872.4130...) MEDICAL DEVICES DENTAL DEVICES Surgical Devices § 872.4130 Intraoral dental drill. (a) Identification. An intraoral dental drill is a rotary device intended to be attached to a dental handpiece to drill holes in...

  15. Aerated drilling cutting transport analysis in geothermal well

    Science.gov (United States)

    Wakhyudin, Aris; Setiawan, Deni; Dwi Marjuan, Oscar

    2017-12-01

    Aeratad drilling widely used for geothermal drilling especially when drilled into predicted production zone. Aerated drilling give better performance on preventing lost circulation problem, improving rate of penetration, and avoiding drilling fluid invasion to productive zone. While well is drilled, cutting is produced and should be carried to surface by drilling fluid. Hole problem, especially pipe sticking will occur while the cutting is not lifted properly to surface. The problem will effect on drilling schedule; non-productive time finally result more cost to be spent. Geothermal formation has different characteristic comparing oil and gas formation. Geothermal mainly has igneous rock while oil and gas mostly sedimentary rock. In same depth, formation pressure in geothermal well commonly lower than oil and gas well while formation temperature geothermal well is higher. While aerated drilling is applied in geothermal well, Igneous rock density has higher density than sedimentary rock and aerated drilling fluid is lighter than water based mud hence minimum velocity requirement to transport cutting is larger than in oil/gas well drilling. Temperature and pressure also has impact on drilling fluid (aerated) density. High temperature in geothermal well decrease drilling fluid density hence the effect of pressure and temperature also considered. In this paper, Aerated drilling cutting transport performance on geothermal well will be analysed due to different rock and drilling fluid density. Additionally, temperature and pressure effect on drilling fluid density also presented to merge.

  16. Multi-state autonomous drilling for lunar exploration

    Directory of Open Access Journals (Sweden)

    Chen Chongbin

    2016-10-01

    Full Text Available Due to the lack of information of subsurface lunar regolith stratification which varies along depth, the drilling device may encounter lunar soil and lunar rock randomly in the drilling process. To meet the load safety requirements of unmanned sampling mission under limited orbital resources, the control strategy of autonomous drilling should adapt to the indeterminable lunar environments. Based on the analysis of two types of typical drilling media (i.e., lunar soil and lunar rock, this paper proposes a multi-state control strategy for autonomous lunar drilling. To represent the working circumstances in the lunar subsurface and reduce the complexity of the control algorithm, lunar drilling process was categorized into three drilling states: the interface detection, initiation of drilling parameters for recognition and drilling medium recognition. Support vector machine (SVM and continuous wavelet transform were employed for the online recognition of drilling media and interface, respectively. Finite state machine was utilized to control the transition among different drilling states. To verify the effectiveness of the multi-state control strategy, drilling experiments were implemented with multi-layered drilling media constructed by lunar soil simulant and lunar rock simulant. The results reveal that the multi-state control method is capable of detecting drilling state variation and adjusting drilling parameters timely under vibration interferences. The multi-state control method provides a feasible reference for the control of extraterrestrial autonomous drilling.

  17. Stinger Enhanced Drill Bits For EGS

    Energy Technology Data Exchange (ETDEWEB)

    Durrand, Christopher J. [Novatek International, Inc., Provo, UT (United States); Skeem, Marcus R. [Novatek International, Inc., Provo, UT (United States); Crockett, Ron B. [Novatek International, Inc., Provo, UT (United States); Hall, David R. [Novatek International, Inc., Provo, UT (United States)

    2013-04-29

    The project objectives were to design, engineer, test, and commercialize a drill bit suitable for drilling in hard rock and high temperature environments (10,000 meters) likely to be encountered in drilling enhanced geothermal wells. The goal is provide a drill bit that can aid in the increased penetration rate of three times over conventional drilling. Novatek has sought to leverage its polycrystalline diamond technology and a new conical cutter shape, known as the Stinger®, for this purpose. Novatek has developed a fixed bladed bit, known as the JackBit®, populated with both shear cutter and Stingers that is currently being tested by major drilling companies for geothermal and oil and gas applications. The JackBit concept comprises a fixed bladed bit with a center indenter, referred to as the Jack. The JackBit has been extensively tested in the lab and in the field. The JackBit has been transferred to a major bit manufacturer and oil service company. Except for the attached published reports all other information is confidential.

  18. A novel test rig to investigate under-platform damper dynamics

    Science.gov (United States)

    Botto, Daniele; Umer, Muhammad

    2018-02-01

    In the field of turbomachinery, vibration amplitude is often reduced by dissipating the kinetic energy of the blades with devices that utilize dry friction. Under-platform dampers, for example, are often placed in the underside of two consecutive turbine blades. Dampers are kept in contact with the under-platform of the respective blades by means of the centrifugal force. If the damper is well designed, vibration of blades instigate a relative motion between the under-platform and the damper. A friction force, that is a non-conservative force, arises in the contact and partly dissipates the vibration energy. Several contact models are available in the literature to simulate the contact between the damper and the under-platform. However, the actual dynamics of the blade-damper interaction have not fully understood yet. Several test rigs have been previously developed to experimentally investigate the performance of under-platform dampers. The majority of these experimental setups aim to evaluate the overall damper efficiency in terms of reduction in response amplitude of the blade for a given exciting force that simulates the aerodynamic loads. Unfortunately, the experimental data acquired on the blade dynamics do not provide enough information to understand the damper dynamics. Therefore, the uncertainty on the damper behavior remains a big issue. In this work, a novel experimental test rig has been developed to extensively investigate the damper dynamic behavior. A single replaceable blade is clamped in the rig with a specific clamping device. With this device the blade root is pressed against a groove machined in the test rig. The pushing force is controllable and measurable, to better simulate the actual centrifugal load acting on the blade. Two dampers, one on each side of the blade, are in contact with the blade under-platforms and with platforms on force measuring supports. These supports have been specifically designed to measure the contact forces on the

  19. Drilling Automation Tests At A Lunar/Mars Analog Site

    Science.gov (United States)

    Glass, B.; Cannon, H.; Hanagud, S.; Lee, P.; Paulsen, G.

    2006-01-01

    Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. The limited mass, energy and manpower in planetary drilling situations makes application of terrestrial drilling techniques problematic. The Drilling Automation for Mars Exploration (DAME) project is developing drilling automation and robotics for projected use in missions to the Moon and Mars in the 2011-15 period. This has been tested recently, drilling in permafrost at a lunar/martian analog site (Haughton Crater, Devon Island, Canada).

  20. Use of Cutting-Edge Horizontal and Underbalanced Drilling Technologies and Subsurface Seismic Techniques to Explore, Drill and Produce Reservoired Oil and Gas from the Fractured Monterey Below 10,000 ft in the Santa Maria Basin of California

    Energy Technology Data Exchange (ETDEWEB)

    George Witter; Robert Knoll; William Rehm; Thomas Williams

    2006-06-30

    This project was undertaken to demonstrate that oil and gas can be drilled and produced safely and economically from a fractured Monterey reservoir in the Santa Maria Basin of California by employing horizontal wellbores and underbalanced drilling technologies. Two vertical wells were previously drilled in this area with heavy mud and conventional completions; neither was commercially productive. A new well was drilled by the project team in 2004 with the objective of accessing an extended length of oil-bearing, high-resistivity Monterey shale via a horizontal wellbore, while implementing managed-pressure drilling (MPD) techniques to avoid formation damage. Initial project meetings were conducted in October 2003. The team confirmed that the demonstration well would be completed open-hole to minimize productivity impairment. Following an overview of the geologic setting and local field experience, critical aspects of the application were identified. At the pre-spud meeting in January 2004, the final well design was confirmed and the well programming/service company requirements assigned. Various design elements were reduced in scope due to significant budgetary constraints. Major alterations to the original plan included: (1) a VSP seismic survey was delayed to a later phase; (2) a new (larger) surface hole would be drilled rather than re-enter an existing well; (3) a 7-in. liner would be placed into the top of the Monterey target as quickly as possible to avoid problems with hole stability; (4) evaluation activities were reduced in scope; (5) geosteering observations for fracture access would be deduced from penetration rate, cuttings description and hydrocarbon in-flow; and (6) rather than use nitrogen, a novel air-injection MPD system was to be implemented. Drilling operations, delayed from the original schedule by capital constraints and lack of rig availability, were conducted from September 12 to November 11, 2004. The vertical and upper curved sections were