WorldWideScience

Sample records for document restoration plan

  1. Environmental Restoration Remedial Action quality assurance requirements document

    International Nuclear Information System (INIS)

    1991-01-01

    This document defines the quality assurance requirements for the US Department of Energy-Richland Operations Office Environmental Restoration Remedial Action program at the Hanford Site. The Environmental Restoration Remedial Action program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. This document combines quality assurance requirements from various source documents into one set of requirements for use by the US Department of Energy-Richland Operations Office and other Environmental Restoration Remedial Action program participants. This document will serve as the basis for developing Quality Assurance Program Plans and implementing procedures by the participants. The requirements of this document will be applied to activities affecting quality, using a graded approach based on the importance of the item, service, or activity to the program objectives. The Quality Assurance Program that will be established using this document as the basis, together with other program and technical documents, form an integrated management control system for conducting the Environmental Restoration Remedial Action program activities in a manner that provides safety and protects the environment and public health

  2. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  3. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  4. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  5. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  6. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  7. Environmental restoration value engineering guidance document

    International Nuclear Information System (INIS)

    1995-07-01

    This document provides guidance on Value Engineering (VE). VE is an organized team effort led by a person trained in the methodology to analyze the functions of projects, systems, equipment, facilities, services, and processes for achieving the essential functions at the lowest life cycle cost while maintaining required performance, reliability, availability, quality, and safety. VE has proven to be a superior tool to improve up-front project planning, cut costs, and create a better value for each dollar spent. This document forms the basis for the Environmental Restoration VE Program, describes the VE process, and provides recommendations on when it can be most useful on ER projects

  8. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  9. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  10. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  11. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    Duvon, D. K.

    1998-01-01

    This plan contains the Pollution Prevention (P2) Program for the Environmental Restoration Contractor (ERC). The plan outlines the activities and schedules developed by the Bechtel Hanford, Inc.(BHI) to reduce the quantity and toxicity of waste dispositioned as a result of restoration and remediation activities. The purpose of this plan is to guide ERC projects in meeting and documenting compliance with requirements for pollution prevention. This plan contains the objectives, strategy, and support activities of the ERC P2 Program

  12. Environmental Restoration Program Roadmap: Strategic program plan

    International Nuclear Information System (INIS)

    1992-01-01

    This document is a strategic plan for accomplishing environmental restoration objectives at the Department of Energy's (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). Waste Management (WM) for environmental restoration activities and integration of these activities into the PORTS WM operations is addressed in this document. The document provides detailed information concerning specific assumptions and activities required to meet DOE's environmental restoration objectives at this site. Environmental contamination at PORTS consists mainly of spent solvents and low level radionuclides. Solvents were used for industrial metal cleaning operations required to maintain the process during operations. Plumes of groundwater contamination resulting from past disposal of these spent solvents in landfills and impoundments extend from several locations within the site. Also, two sludge impoundments associated with a chromate reduction facility were characterized as having soil and groundwater contaminated with hexavalent chromium

  13. Quality Assurance Program Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1992-01-01

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document

  14. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  15. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  16. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  17. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  18. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  19. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan. Revision 1

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-03-01

    This plan contains the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program. The plan outlines the activities and schedules developed by the ERC to reduce the quantity and toxicity of waste dispositioned as a result of restoration and remediation activities. This plan satisfies US Department of Energy (DOE) requirements including the Pollution Prevention Awareness program required by DOE Order 5400.1 (DOE 1988). This plan is consistent with Executive Order 12856 and Secretary O'Leary's pollution prevention Policy Statement of December 27, 1994, which set US and DOE pollution prevention policies, respectively. It is also consistent with the DOE Pollution Prevention Crosscut Plan, 1994, which provides guidance in meeting the DOE goals in pollution prevention. The purpose of this plan is to aid ERC projects in meeting and documenting compliance with requirements for WMin/P2. This plan contains the objectives, strategy, and support activities of the ERC Team WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Wherever appropriate, the ERC will integrate the pollution prevention activities in this plan into regular program activities rather than establishing separate WMin/P2 activities. Moreover, wherever possible, existing documents, procedures, and activities will be used to meet WMin/P2 requirements

  20. Hanford Site waste management and environmental restoration integration plan

    International Nuclear Information System (INIS)

    Merrick, D.L.

    1990-01-01

    The ''Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs

  1. Strategic plan for Hanford Site Environmental Restoration Information Management

    International Nuclear Information System (INIS)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site's soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site's production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user's needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach

  2. Technical framework for groundwater restoration

    International Nuclear Information System (INIS)

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled ''Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration

  3. Power system restoration: planning and simulation

    Energy Technology Data Exchange (ETDEWEB)

    Hazarika, D. [Assam Engineering Coll., Dept. of Electrical Engineering, Assam (India); Sinha, A.K. [Inidan Inst. of Technology, Dept. of Electrical Engineering, Kharagpur (India)

    2003-03-01

    This paper describes a restoration guidance simulator, which allows power system operator/planner to simulate and plan restoration events in an interactive mode. The simulator provides a list of restoration events according to the priority based on some restoration rules and list of priority loads. It also provides in an interactive mode the list of events, which becomes possible as the system grows during restoration. Further, the selected event is validated through a load flow and other analytical tools to show the consequences of implementing the planned event. (Author)

  4. Multiscale analysis of restoration priorities for marine shoreline planning.

    Science.gov (United States)

    Diefenderfer, Heida L; Sobocinski, Kathryn L; Thom, Ronald M; May, Christopher W; Borde, Amy B; Southard, Susan L; Vavrinec, John; Sather, Nichole K

    2009-10-01

    Planners are being called on to prioritize marine shorelines for conservation status and restoration action. This study documents an approach to determining the management strategy most likely to succeed based on current conditions at local and landscape scales. The conceptual framework based in restoration ecology pairs appropriate restoration strategies with sites based on the likelihood of producing long-term resilience given the condition of ecosystem structures and processes at three scales: the shorezone unit (site), the drift cell reach (nearshore marine landscape), and the watershed (terrestrial landscape). The analysis is structured by a conceptual ecosystem model that identifies anthropogenic impacts on targeted ecosystem functions. A scoring system, weighted by geomorphic class, is applied to available spatial data for indicators of stress and function using geographic information systems. This planning tool augments other approaches to prioritizing restoration, including historical conditions and change analysis and ecosystem valuation.

  5. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  6. WIPP documentation plan

    International Nuclear Information System (INIS)

    Plung, D.L.; Montgomery, T.T.; Glasstetter, S.R.

    1986-01-01

    In support of the programs at the Waste Isolation Pilot Plant (WIPP), the Publications and Procedures Section developed a documentation plan that provides an integrated document hierarchy; further, this plan affords several unique features: 1) the format for procedures minimizes the writing responsibilities of the technical staff and maximizes use of the writing and editing staff; 2) review cycles have been structured to expedite the processing of documents; and 3) the numbers of documents needed to support the program have been appreciably reduced

  7. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1994-11-01

    The purpose of this plan is to establish the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program and outline the activities and schedules that will be employed to reduce the quantity and toxicity of wastes generated as a result of restoration and remediation activities. It is intended to satisfy the US Department of Energy (DOE) and other legal requirements. As such, the Pollution Prevention Awareness program required by DOE Order 5400.1 is included with the Pollution Prevention Program. This plan is also intended to aid projects in meeting and documenting compliance with the various requirements for WMin/P2, and contains the policy, objectives, strategy, and support activities of the WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Various pollution prevention techniques will be implemented with the support of employee training and awareness programs to reduce waste and still meet applicable requirements. Information about the Hanford Site is in the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan

  8. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  9. Environmental restoration remedial action quality assurance requirements document

    International Nuclear Information System (INIS)

    Cote, R.F.

    1991-01-01

    The environmental Restoration Remedial Action Quality Assurance Requirements Document (DOE/RL 90-28) defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site, Richland, Washington. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency

  10. Planning document for the Advanced Landfill Cover Demonstration

    International Nuclear Information System (INIS)

    Hakonson, T.E.; Bostick, K.V.

    1994-01-01

    The Department of Energy and Department of Defense are faced with the closure of thousands of decommissioned radioactive, hazardous, and mixed waste landfills as a part of ongoing Environmental Restoration activities. Regulations on the closure of hazardous and radioactive waste landfills require the construction of a ''low-permeability'' cover over the unit to limit the migration of liquids into the underlying waste. These landfills must be maintained and monitored for 30 years to ensure that hazardous materials are not migrating from the landfill. This test plan is intended as an initial road map for planning, designing, constructing, evaluating, and documenting the Advanced Landfill Cover Demonstration (ALCD). It describes the goals/ objectives, scope, tasks, responsibilities, technical approach, and deliverables for the demonstration

  11. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  12. Groundwater protection plan for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Weekes, D.C.; Jaeger, G.K.; McMahon, W.J.; Ford, B.H.

    1996-01-01

    This document is the groundwater protection plan for the Environmental Restoration Disposal Facility (ERDF) Project. This plan is prepared based on the assumption that the ERDF will receive waste containing hazardous/dangerous constituents, radioactive constituents, and combinations of both. The purpose of this plan is to establish a groundwater monitoring program that (1) meets the intent of the applicable or relevant and appropriate requirements, (2) documents baseline groundwater conditions, (3) monitors those conditions for change, and (4) allows for modifications to groundwater sampling if required by the leachate management program. Groundwater samples indicate the occurrence of preexisting groundwater contamination in the uppermost unconfined aquifer below the ERDF Project site, as a result of past waste-water discharges in the 200 West Area. Therefore, it is necessary for the ERDF to establish baseline groundwater quality conditions and to monitor changes in the baseline over time. The groundwater monitoring program presented in this plan will provide the means to assess onsite and offsite impacts to the groundwater. In addition, a separate leachate management program will provide an indication of whether the liners are performing within design standards

  13. 78 FR 57875 - Notice of Availability of the Draft Southeast Missouri Ozarks Regional Restoration Plan and...

    Science.gov (United States)

    2013-09-20

    ... environment. The results of this administrative process are contained in the planning and decision document... negotiated settlements or adjudicated awards, must be used to restore, rehabilitate, replace and/or acquire...

  14. The U.S. Department of Energy Environmental Restoration and Waste Management Five-Year Plan

    International Nuclear Information System (INIS)

    Grimm, P.

    1990-01-01

    Within the first month after being confirmed as this country's sixth secretary of energy, Admiral James D. Watkins (US Navy, Retired) promised Congress that he would deliver a comprehensive plan that outlines specific actions to undertake over the next 5 yr to achieve compliance with US environmental laws and to begin to clean up and restore those sites that we have contaminated over the past 40 yr. The Environmental Restoration and Waste Management Five-Year Plan was published in August 1989. As the admiral committed, the plan established and documented an agenda for compliance and cleanup against which progress in the area of environmental restoration and waste management would be measured and specifically identified actions and commitments to achieve this progress. In November 1989, an additional chapter identifying the applied research, development, demonstration, testing, and evaluation (RDDT and E) activities that would support the implementation of the plan was published. Last June, the US Department of Energy (DOE) issued the first annual update of the 5-yr plan. This update covers the years 1992-1996, notes the progress achieved during the past year, and incorporates the scope of both the original plan and the RDDT and E plan. The plan is divided into five sections: corrective activities, environmental restoration, waste operations, technology development, and transportation. Each section explains DOE's overall policies and plans for achieving compliance and cleanup at DOE's nuclear-related facilities

  15. Environmental restoration and decontamination and decommissioning safety documentation

    International Nuclear Information System (INIS)

    Hansen, J.L.; Frauenholz, L.H.; Kerr, N.R.

    1993-01-01

    This document presents recommendations of a working group designated by the Environmental Restoration and Remediation (ER) and Decontamination and Decommissioning (D ampersand D) subcommittees of the Westinghouse M ampersand O (Management and Operation) Nuclear Facility Safety Committee. A commonalty of approach to safety documentation specific to ER and D ampersand D activities was developed and is summarized below. Allowance for interpretative tolerance and documentation flexibility appropriate to the activity, graded for hazard category, duration, and complexity, was a primary consideration in development of this guidance

  16. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration

  17. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  18. The Hanford Site Environmental Restoration Program 1993 fiscal year work plan

    International Nuclear Information System (INIS)

    1992-09-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This document describes the overall ER Mission Area and provides FYWP appendixes for each of the five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Treatment, Storage, and/or Disposal (TSD)

  19. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  20. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D ampersand D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities

  1. Bechtel Hanford, Inc./ERC team health and safety plan Environmental Restoration Disposal Facility operations

    International Nuclear Information System (INIS)

    Turney, S.R.

    1996-02-01

    A comprehensive safety and health program is essential for reducing work-related injuries and illnesses while maintaining a safe and health work environment. This document establishes Bechtel Hanford, Inc. (BHI)/Environmental Restoration Contractor (ERC) team requirements, policies, and procedures and provides preliminary guidance to the Environmental Restoration Disposal Facility (ERDF) subcontractor for use in preparing essential safety and health documents. This health and safety plan (HASP) defines potential safety and health issues associated with operating and maintaining the ERDF. A site-specific HASP shall be developed by the ERDF subcontractor and shall be implemented before operations and maintenance work can proceed. An activity hazard analysis (AHA) shall also be developed to provide procedures to identify, assess, and control hazards or potential incidents associated with specific operations and maintenance activities

  2. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Frappaolo, C.

    1995-09-01

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records' life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites

  3. 7 CFR 1730.28 - Emergency Restoration Plan (ERP).

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Emergency Restoration Plan (ERP). 1730.28 Section... § 1730.28 Emergency Restoration Plan (ERP). (a) Each borrower with an approved RUS electric program loan as of October 12, 2004 shall have a written ERP no later than January 12, 2006. The ERP should be...

  4. Idaho National Engineering Laboratory installation roadmap document

    International Nuclear Information System (INIS)

    1993-01-01

    The roadmapping process was initiated by the US Department of Energy's office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included

  5. Planning documents: a business planning strategy.

    Science.gov (United States)

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  6. 15 CFR 990.55 - Restoration selection-developing restoration plans.

    Science.gov (United States)

    2010-01-01

    ... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning Phase § 990.55... success or the need for corrective action, and whether monitoring of a reference or control site is needed...

  7. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  8. Health and safety plan for operations performed for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Trippet, W.A. II; Reneau, M.; Morton, S.L.

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  9. Semantic Metadata for Heterogeneous Spatial Planning Documents

    Science.gov (United States)

    Iwaniak, A.; Kaczmarek, I.; Łukowicz, J.; Strzelecki, M.; Coetzee, S.; Paluszyński, W.

    2016-09-01

    Spatial planning documents contain information about the principles and rights of land use in different zones of a local authority. They are the basis for administrative decision making in support of sustainable development. In Poland these documents are published on the Web according to a prescribed non-extendable XML schema, designed for optimum presentation to humans in HTML web pages. There is no document standard, and limited functionality exists for adding references to external resources. The text in these documents is discoverable and searchable by general-purpose web search engines, but the semantics of the content cannot be discovered or queried. The spatial information in these documents is geographically referenced but not machine-readable. Major manual efforts are required to integrate such heterogeneous spatial planning documents from various local authorities for analysis, scenario planning and decision support. This article presents results of an implementation using machine-readable semantic metadata to identify relationships among regulations in the text, spatial objects in the drawings and links to external resources. A spatial planning ontology was used to annotate different sections of spatial planning documents with semantic metadata in the Resource Description Framework in Attributes (RDFa). The semantic interpretation of the content, links between document elements and links to external resources were embedded in XHTML pages. An example and use case from the spatial planning domain in Poland is presented to evaluate its efficiency and applicability. The solution enables the automated integration of spatial planning documents from multiple local authorities to assist decision makers with understanding and interpreting spatial planning information. The approach is equally applicable to legal documents from other countries and domains, such as cultural heritage and environmental management.

  10. SEMANTIC METADATA FOR HETEROGENEOUS SPATIAL PLANNING DOCUMENTS

    Directory of Open Access Journals (Sweden)

    A. Iwaniak

    2016-09-01

    Full Text Available Spatial planning documents contain information about the principles and rights of land use in different zones of a local authority. They are the basis for administrative decision making in support of sustainable development. In Poland these documents are published on the Web according to a prescribed non-extendable XML schema, designed for optimum presentation to humans in HTML web pages. There is no document standard, and limited functionality exists for adding references to external resources. The text in these documents is discoverable and searchable by general-purpose web search engines, but the semantics of the content cannot be discovered or queried. The spatial information in these documents is geographically referenced but not machine-readable. Major manual efforts are required to integrate such heterogeneous spatial planning documents from various local authorities for analysis, scenario planning and decision support. This article presents results of an implementation using machine-readable semantic metadata to identify relationships among regulations in the text, spatial objects in the drawings and links to external resources. A spatial planning ontology was used to annotate different sections of spatial planning documents with semantic metadata in the Resource Description Framework in Attributes (RDFa. The semantic interpretation of the content, links between document elements and links to external resources were embedded in XHTML pages. An example and use case from the spatial planning domain in Poland is presented to evaluate its efficiency and applicability. The solution enables the automated integration of spatial planning documents from multiple local authorities to assist decision makers with understanding and interpreting spatial planning information. The approach is equally applicable to legal documents from other countries and domains, such as cultural heritage and environmental management.

  11. Incorporating climate change projections into riparian restoration planning and design

    Science.gov (United States)

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  12. Management Restoration Plans for Coastal Villages

    Directory of Open Access Journals (Sweden)

    Rudianto Rudianto

    2017-03-01

    Full Text Available The village is located in the coastal area up to this time has decreased the quality of the coastal environment either caused by the process of natural or anthropogenic processes. Coastal damage Persistent will affect people's lives. Based on studies conducted by Rudianto (2013 and continued research by Rudianto (2014 on the institutional model for implementing the strategy, the resulting output coast of research called restoration plan for coastal villages or R2DP coastal villages. The objective of R2DP is helping the village administration to alleviate the problems of coastal areas. R2DP is a guideline that will be used by the village government based on a legal framework called the village regulations. The method used to compile R2DP is descriptive method. By using the method of Miles and Huberman (1984 used data reduction techniques. This technique is to pick and choose which data is critical to focus on the purpose of research. the results of research to produce findings about the restoration plan or a coastal village called R2DP. The essence of the mechanism and procedure R2DP is doing the restoration work by using institutions as a means of restoration.

  13. Planning for Environmental Restoration in Slovak Republic

    International Nuclear Information System (INIS)

    Slavik, O.; Moravek, J.

    1995-01-01

    The restoration in the Slovak Republic concerns to the contaminated banks of the waste water recipient of the Bohunice Nuclear Power Plant. The identified contamination, consisting mainly of 137 Cs, is a result of two accidents on the CO 2 -cooled and heavy water moderated NPP Bohunice-A1 unit of NPP Bohunice complex. Two type of radiation risk scenarios, namely the bank use and contaminated soil (from bank) use scenario were investigated in relation to decision making on the planning for restoration of the contaminated banks. Results of dose assessments and the approach to planning for restoration of contaminated banks are summarized in the paper. Some details from the worked out technical design of the contaminated soil removal from the banks and its safe disposal in a near surface isolated basin are introduced in the paper too

  14. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1993-01-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94

  15. Application of Science-Based Restoration Planning to a Desert River System

    Science.gov (United States)

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  16. Application of science-based restoration planning to a desert river system

    Science.gov (United States)

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-01-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  17. 12 CFR 208.44 - Capital restoration plans.

    Science.gov (United States)

    2010-01-01

    ... capital restoration plan shall not limit the liability of the company under any guarantee required or... condition or practice. No plan shall be accepted unless it includes any performance guarantee described in... Corporation. (i) Performance guarantee by companies that control a bank—(1) Limitation on Liability. (i...

  18. Idaho National Engineering Laboratory installation roadmap document. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-30

    The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

  19. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  20. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  1. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites

  2. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  3. Are Urban Stream Restoration Plans Worth Implementing?

    Science.gov (United States)

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  4. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  5. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2010-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service Coral Reef Restoration Plan, Draft Programmatic... Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National Environmental... availability of a Draft Programmatic Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan...

  6. A mangrove creek restoration plan utilizing hydraulic modeling.

    Science.gov (United States)

    Marois, Darryl E; Mitsch, William J

    2017-11-01

    Despite the valuable ecosystem services provided by mangrove ecosystems they remain threatened around the globe. Urban development has been a primary cause for mangrove destruction and deterioration in south Florida USA for the last several decades. As a result, the restoration of mangrove forests has become an important topic of research. Using field sampling and remote-sensing we assessed the past and present hydrologic conditions of a mangrove creek and its connected mangrove forest and brackish marsh systems located on the coast of Naples Bay in southwest Florida. We concluded that the hydrology of these connected systems had been significantly altered from its natural state due to urban development. We propose here a mangrove creek restoration plan that would extend the existing creek channel 1.1 km inland through the adjacent mangrove forest and up to an adjacent brackish marsh. We then tested the hydrologic implications using a hydraulic model of the mangrove creek calibrated with tidal data from Naples Bay and water levels measured within the creek. The calibrated model was then used to simulate the resulting hydrology of our proposed restoration plan. Simulation results showed that the proposed creek extension would restore a twice-daily flooding regime to a majority of the adjacent mangrove forest and that there would still be minimal tidal influence on the brackish marsh area, keeping its salinity at an acceptable level. This study demonstrates the utility of combining field data and hydraulic modeling to aid in the design of mangrove restoration plans.

  7. AUDIT plan documenting method

    International Nuclear Information System (INIS)

    Cornecsu, M.

    1995-01-01

    The work describes a method of documenting the AUDIT plan upon the basis of two quantitative elements resulting from quality assurance program appraisal system function implementation degree as established from the latest AUDIT performed an system function weight in QAP, respectively, appraised by taking into account their significance for the activities that are to be performed in the period for which the AUDITs are planned. (Author) 3 Figs., 2 Refs

  8. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  9. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  10. Project Gasbuggy well plugging and site restoration plan

    International Nuclear Information System (INIS)

    1978-07-01

    The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations

  11. South Bay Salt Pond Tidal Wetland Restoration Phase II Planning

    Science.gov (United States)

    Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re

  12. Watershed restoration: planning and implementing small dam removals to maximize ecosystem services

    Science.gov (United States)

    Tonitto, C.; Riha, S. J.

    2016-12-01

    River restoration and enhancing watershed connectivity is of growing concern in industrialized nations. The past two decades have seen a number of small dam removals, though many removals remain unstudied and poorly documented. We summarize socio-economic and biophysical lessons learned during the past two decades of accelerated activity regarding small dam removals throughout the United States. We present frameworks for planning and implementing removals developed by interdisciplinary engagement. Toward the goal of achieving thorough dam removal planning, we present outcomes from well-documented small dam removals covering ecological, chemical, and physical change in rivers post-dam removal, including field observation and modeling methodologies. Guiding principles of a dam removal process should include: 1) stakeholder engagement to navigate the complexity of watershed landuse, 2) an impacts assessment to inform the planning process, 3) pre- and post-dam removal observations of ecological, chemical and physical properties, 4) the expectation that there are short- and long-term ecological dynamics with population recovery depending on whether dam impacts were largely related to dispersion or to habitat destruction, 5) an expectation that changes in watershed chemistry are dependent on sediment type, sediment transport and watershed landuse, and 6) rigorous assessment of physical changes resulting from dam removal, understanding that alteration in hydrologic flows, sediment transport, and channel evolution will shape ecological and chemical dynamics, and shape how stakeholders engage with the watershed.

  13. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  14. Climate change in the four corners and adjacent regions: Implications for environmental restoration and land-use planning

    Energy Technology Data Exchange (ETDEWEB)

    Waugh, W.J. [ed.

    1995-09-01

    This document contains the workshop proceedings on Climate Change in the Four Corners and Adjacent Regions: Implications for Environmental Restoration and Land-Use Planning which took place September 12-14, 1994 in Grand Junction, Colorado. The workshop addressed three ways we can use paleoenvironmental data to gain a better understanding of climate change and its effects. (1) To serve as a retrospective baseline for interpreting past and projecting future climate-induced environmental change, (2) To differentiate the influences of climate and humans on past environmental change, and (3) To improve ecosystem management and restoration practices in the future. The papers presented at this workshop contained information on the following subjects: Paleoclimatic data from the Pleistocene and Holocene epochs, climate change and past cultures, and ecological resources and environmental restoration. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  15. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  16. 76 FR 9327 - Gulf Spill Restoration Planning; Notice of Intent To Begin Restoration Scoping and Prepare a...

    Science.gov (United States)

    2011-02-17

    ... to compensate the public and the environment for loss of natural resources and services from the... Florida, as well as human uses of these resources. Natural Resource Damage Assessment (NRDA) is the... Restoration Planning; Notice of Intent To Begin Restoration Scoping and Prepare a Programmatic Environmental...

  17. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Science.gov (United States)

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  18. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program's management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention

  19. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

  20. Drinking water protection plan; a discussion document

    International Nuclear Information System (INIS)

    2001-01-01

    This draft document outlines the plan of action devised by the Government of British Columbia in an effort to safeguard the purity of the drinking water supply in the province, and invites British Columbians to participate in the elaboration of such a plan. This document concentrates on the assessment of the sources of the water supply (watersheds and aquifers) and on measures to ensure the integrity of the system of water treatment and distribution as the principal components of a comprehensive plan to protect drinking water. The proposed plan involves a multi-barrier approach that will use a combination of measures to ensure that water sources are properly managed and waterworks systems provide safe drinking water. New drinking water planning procedures, more effective local influence and authority, enforceable standards, better access to information and public education programs form the essence of the plan. A series of public meetings are scheduled to provide the public at large with opportunities to comment on the government's plan of action and to offer suggestions for additional measures

  1. Electronic document management meets environmental restoration recordkeeping requirements: A case study

    International Nuclear Information System (INIS)

    Burnham, S.L.

    1995-01-01

    Efforts at migrating records management at five Department of Energy sites operated under management by Lockheed Martin Energy Systems, Inc. for Environmental Restoration (ER) business activities are described. The corporate environment, project definition, records keeping requirements are described first. Then an evaluation of electronic document management technologies and of internal and commercially available systems are provided. Finally adopted incremental implementation strategy and lessons learned are discussed

  2. 12 CFR 565.5 - Capital restoration plans.

    Science.gov (United States)

    2010-01-01

    ... guarantee of a capital restoration plan shall not limit the liability of the company under any guarantee... full amount of that guarantee from any or all of the companies issuing the guarantee. (2) Failure to... shall be accepted unless it includes any performance guarantee described in section 38(e)(2)(C) of the...

  3. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    International Nuclear Information System (INIS)

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

  4. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  5. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    Science.gov (United States)

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  6. Ankara Historic City Centre Restoration Site Conservation Plan, its Characteristics, and Rationales for its Revocation

    Directory of Open Access Journals (Sweden)

    Mehmet Tuncer

    2013-12-01

    Full Text Available This is a comprehensive evaluation of the 1: 5000 Ankara Historic City Centre Restoration Site Conservation Master Development Plan and the 1: 1000 Conservation Implementation Plans, which have become a matter of litigation against the Ankara Metropolitan Municipality, filed by various non-governmental organizations, universities, the Union of Chambers of Turkish Architects and Engineers (TMMOB and public institutions; in terms of the environment, transportation and traffic as regards the entirety of the planned location, and the integrity of the plan, based on conservation-reclamation planning essentials and public interest. Thus the Ulus Ankara Historic City Centre Restoration Site Conservation Master Development and Implementation Plan and Plan Notes as ratified by the Ankara Metropolitan Municipality and Conservation Board, are examined in this context in terms of restoration site, protected site, conservation site, interaction and transition sites and historic and cultural properties.

  7. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  8. Technical approach to groundwater restoration

    International Nuclear Information System (INIS)

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  9. Environmental Restoration and Waste Management Site-Specific Plan (SSP) for fiscal year 1992 (FY92)

    International Nuclear Information System (INIS)

    1991-09-01

    The FY-92 Site-Specific Plan (FY-92 SSP) for environmental restoration and waste management at the Idaho National Engineering Laboratory (INEL) is designed to provide the reader with easy access to the status of environmental restoration and waste management activities at INEL. The first chapter provides background on INIEL's physical environment, site history and mission, and general information about the site and its facilities. In addition, this chapter discusses the inter-relationships between the Site Specific Plan, the Environmental Restoration and Waste Management Five-Year Plan, the environmental restoration and waste management prioritization systems, and the Activity Data Sheets (ADSs) for environmental restoration and waste management. This discussion should help readers understand what the SSP is and how it fits into the environmental restoration and waste management process at INEL. This understanding should provide the reader with a better context for understanding the discussions in the SSP as well as a better feel for how and what to comment on during the public comment period that will be held from the first of September through the end of October 1991

  10. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    International Nuclear Information System (INIS)

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL's ER and WM programs as managed by DOE's Idaho Field Office (DOE-ID)

  11. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  12. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  13. Land use-based landscape planning and restoration in mine closure areas.

    Science.gov (United States)

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  14. Land Use-Based Landscape Planning and Restoration in Mine Closure Areas

    Science.gov (United States)

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P.; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  15. Wilmar Planning Tool, VBA documentation

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Helge V.

    2006-01-15

    This is a documentation of the VBA (Visual Basic for Applications) in the Wilmar Planning Tool. VBA is used in the Wilmar User Shell (an Excel workbook) and in the three Access databases that hold input, scenario and output data. The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (contract ENK5-CT-2002-00663). The User Shell controls the operation of the Wilmar Planning Tool. In the User Shell various control parameters are set, and then a macro in the Input Database is run that writes input files for the Joint market Model and the Long Term Model. Afterwards these models can be started from the User Shell. Finally, the User Shell can start a macro in the Output Database that imports the output files from the models. (LN)

  16. Wilmar Planning Tool, VBA documentation

    International Nuclear Information System (INIS)

    Larsen, Helge V.

    2006-01-01

    This is a documentation of the VBA (Visual Basic for Applications) in the Wilmar Planning Tool. VBA is used in the Wilmar User Shell (an Excel workbook) and in the three Access databases that hold input, scenario and output data. The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (contract ENK5-CT-2002-00663). The User Shell controls the operation of the Wilmar Planning Tool. In the User Shell various control parameters are set, and then a macro in the Input Database is run that writes input files for the Joint market Model and the Long Term Model. Afterwards these models can be started from the User Shell. Finally, the User Shell can start a macro in the Output Database that imports the output files from the models. (LN)

  17. Planning aquatic ecosystem restoration monitoring programs

    Energy Technology Data Exchange (ETDEWEB)

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  18. Strategic plan

    International Nuclear Information System (INIS)

    1993-01-01

    In November 1989, the Office of Environmental Restoration and Waste Management (EM) was formed within the US Department of Energy (DOE). The EM Program was born of the recognition that a significant national effort was necessary to clean up over 45 years' worth of environmental pollution from DOE operations, including the design and manufacture of nuclear materials and weapons. Within EM, the Deputy Assistant Secretary for Environmental Restoration (EM-40) has been assigned responsibility for the assessment and cleanup of areas and facilities that are no longer a part of active DOE operations, but may be contaminated with varying levels and quantifies of hazardous, radioactive, and n-mixed waste. Decontamination and decommissioning (D ampersand D) activities are managed as an integral part of Envirorunental Restoration cleanup efforts. The Office of Environmental Restoration ensures that risks to the environment and to human health and safety are either eliminated or reduced to prescribed, acceptable levels. This Strategic Plan has been developed to articulate the vision of the Deputy Assistant Secretary for Environmental Restoration and to crystallize the specific objectives of the Environmental Restoration Program. The document summarizes the key planning assumptions that guide or constrain the strategic planning effort, outlines the Environmental Restoration Program's specific objectives, and identifies barriers that could limit the Program's success

  19. 20 CFR 668.710 - What planning documents must an INA grantee submit?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an INA grantee... Planning/Funding Process § 668.710 What planning documents must an INA grantee submit? Each grantee... participant services and expenditures covering the two-year planning cycle. We will, in consultation with the...

  20. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  1. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER ampersand WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER ampersand WM activities at the sites, including potential needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER ampersand WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab

  2. 75 FR 41881 - Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-07-19

    ... lakeshore; and improved water quality. DATES: Any comments on the scope of issues to be addressed in the EIS... Restoration and Management Plan/Environmental Impact Statement (EIS) for Indiana Dunes National Lakeshore... impact statement (EIS) for a Shoreline Restoration and Management Plan (SRMP) for Indiana Dunes National...

  3. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  4. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones

  5. Inside the "Black Box" of River Restoration: Using Catchment History to Identify Disturbance and Response Mechanisms to Set Targets for Process-Based Restoration

    Directory of Open Access Journals (Sweden)

    Sarah Mika

    2010-12-01

    Full Text Available Many river restoration projects fail. Inadequate project planning underpins many of the reasons given for failure (such as setting overly ambitious goals; selecting inappropriate sites and techniques; losing stakeholder motivation; and neglecting to monitor, assess, and document projects. Another major problem is the lack of an agreed guiding image to direct the activities aimed at restoring the necessary biophysical and ecological processes within the logistic constraints of on-ground works. Despite a rich literature defining the components of restoration project planning, restoration ecology currently lacks an explicit and logical means of moving from the initial project vision through to on-ground strategies. Yet this process is fundamental because it directly links the ecological goals of the project to the on-ground strategies used to achieve them. We present a planning process that explicitly uses an interdisciplinary mechanistic model of disturbance drivers and system responses to build from the initial project vision to the implementation of on-ground works. A worked example on the Upper Hunter River in southeastern Australia shows how understanding catchment history can reveal disturbance and response mechanisms, thus facilitating process-based restoration.

  6. 78 FR 35602 - Coeur d'Alene Basin Restoration Plan, Kootenai, Shoshone and Benewah Counties, Idaho

    Science.gov (United States)

    2013-06-13

    ... restoration of the natural resources and services injured as a result of the release of mining related... OF THE INTERIOR Bureau of Land Management Fish and Wildlife Service Coeur d'Alene Basin Restoration... Basin Restoration Plan by any of the following methods: Web site: www.restorationpartnership.org . Email...

  7. 20 CFR 669.510 - What planning documents must an NFJP grantee submit?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an NFJP grantee submit? 669.510 Section 669.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... Accountability, Planning and Waiver Provision § 669.510 What planning documents must an NFJP grantee submit? Each...

  8. An analysis of attitudes towards the comprehensive Everglades Restoration Plan using market segmentation

    Science.gov (United States)

    Jeffrey J. Bransford; Robert D. Bixler; William E. Hammitt

    2006-01-01

    Manipulation of water systems in south Florida have created hundreds of miles of canals, dams, and other diversions. These efforts significantly altered the region?s hydrology and introduced unanticipated changes into the ecosystem. In 2000, the Comprehensive Everglades Restoration Plan (CERP) was authorized to restore, protect, and preserve these wetlands....

  9. Restoration Plan for Degraded Forest in The Democratic People’s Republic of Korea Considering Suitable Tree Species and Spatial Distribution

    Directory of Open Access Journals (Sweden)

    Sle-gee Lee

    2018-03-01

    Full Text Available The ecosystem across the Democratic People’s Republic of Korea (DPRK is threatened by deforestation. However, there is very little attention being given to government efforts for afforestation and rehabilitation plan. The most significant barriers to addressing this problem are technique limitations, availability of information, and lack of a stepwise forest management plan. This study identifies spatially suitable tree species, and establishes a stepwise restoration plan to support decision making for restoring degraded forest in the DPRK throughout a suitable restoration map. First off, target species were chosen from reference data, and spatial distribution maps for each tree species were prepared based on social needs as well as natural conditions in the DPRK. The suitable restoration map was calculated by two priorities in a weighting method; suitable priority, and distributional clustering level. Finally, the 23 afforestation species were selected for the suitable restoration map, including 11 coniferous and 12 deciduous tree species. We introduced a stepwise afforestation/restoration plan of degraded forest in the DPRK; general (long-term, detailed (medium-term, implementation (short-term plans. Maps with different spatial resolutions were prepared for each of the plans. A restoration map with 12.5 km spatial resolution can be used for the general plan at the national level, and maps with 5 km and 1 km spatial resolutions can be used for detailed plan at the local level and implementation plan at the site level, respectively.

  10. 15 CFR 990.53 - Restoration selection-developing restoration alternatives.

    Science.gov (United States)

    2010-01-01

    ... OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning Phase § 990.53... justify restoration, trustees may proceed with the Restoration Planning Phase. Otherwise, trustees may not... discount all service quantities and/or values to the date the demand is presented to the responsible...

  11. Bechtel Hanford, Inc. network security plan for the environmental restoration contract

    International Nuclear Information System (INIS)

    McCaffrey, M.B.

    1997-01-01

    As part of the Computer Protection Program, this Network Security Plan identifies the specific security measures used to protect the Bechtel Hanford, Inc. (BHI) enterprise network. The network consists of the communication infrastructure and information systems used by BHI to perform work related to the Environmental Restoration Contract (ERC) at the Hanford Site. It provides electronic communication between the ERC-leased facilities in Richland, Washington and other facilities located on the Hanford Site. Network gateways to other site and offsite networks provide electronic communication with the rest of the Hanford community. The enterprise network is comprised of several individual networks that operate under different conditions and perform different functions. The principal network used by BHI is the Bechtel Local Area Network (BLAN). This document identifies specific security issues surrounding the BLAN and the measures BHI takes to protect it. The other BHI-operated networks are discussed from the perspective of the security impact they have on the BLAN. This plan addresses security for individual and shared computer systems connected to the BHI networks as well as the gateways between other site and external networks. It specifically does not address computer-based information systems that store or process particularly sensitive data, computer systems connected to other site networks (e.g., Hanford Local Area Network), or standalone computers located in ERC facilities

  12. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  13. Planning for and managing environmental restoration waste

    International Nuclear Information System (INIS)

    Miller, J.Q.

    1993-01-01

    This paper describes the approach used to support the management of environmental restoration (ER) waste. A general description is provided of the tools and techniques that have been developed and applied to produce waste generation forecast data and treatment, storage, and disposal capacity needs. The ER Program can now consistently manage ER waste streams from initial generation through ultimate disposal. Utilizing the valuable information that results from application of strategically planned systems and techniques demonstrates the ability to provide the necessary waste management support for the ER cleanup process

  14. 20 CFR 668.720 - What information must these planning documents contain?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What information must these planning... 166 Planning/Funding Process § 668.720 What information must these planning documents contain? (a) The... planning instructions issued by the Department, the comprehensive services plan must describe in narrative...

  15. Strategic planning in hospitals in two Australian states: an exploratory study of its practice using planning documentation.

    Science.gov (United States)

    Jayasuriya, R; Sim, A B

    1998-01-01

    Hospitals are under pressure to respond to new challenges and competition. Many hospitals have used strategic planning to respond to these environmental changes. This exploratory study examines the extent of strategic planning in hospitals in two Australian States, New South Wales and Victoria, using a sample survey. Based on planning documentation, the study indicated that 47% of the hospitals surveyed did not have a strategic or business plan. A significant difference was found in the comprehensiveness of the plans between the two States. Plans from Victorian hospitals had more documented evidence of external/internal analysis, competitor orientation and customer orientation compared with plans from New South Wales hospitals. The paper discusses the limitations of the study and directions for future research.

  16. Site and facility transportation services planning documents

    Energy Technology Data Exchange (ETDEWEB)

    Ratledge, J.E. (Oak Ridge National Lab., TN (USA)); Danese, L.; Schmid, S. (Science Applications International Corp., Oak Ridge, TN (USA))

    1990-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities. The preparation and processing of Site and Facility Specific Transportation Services Planning Documents (SPDs) and Site Specific Servicing Plans (SSSPs) provides a focus for advanced planning and the actual shipping of waste, as well as the overall development of transportation requirements for the waste transportation system. SPDs will be prepared for each of the affected nuclear waste facilities over the next 2 years with initial emphasis on facilities likely to be served during the earliest years of the Federal Waste Management System (FWMS) operations. 3 figs., 1 tab.

  17. Site and facility transportation services planning documents

    International Nuclear Information System (INIS)

    Ratledge, J.E.; Danese, L.; Schmid, S.

    1990-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities. The preparation and processing of Site and Facility Specific Transportation Services Planning Documents (SPDs) and Site Specific Servicing Plans (SSSPs) provides a focus for advanced planning and the actual shipping of waste, as well as the overall development of transportation requirements for the waste transportation system. SPDs will be prepared for each of the affected nuclear waste facilities over the next 2 years with initial emphasis on facilities likely to be served during the earliest years of the Federal Waste Management System (FWMS) operations. 3 figs., 1 tab

  18. Transportation Business Plan: strategy options document

    International Nuclear Information System (INIS)

    1984-10-01

    This document provides the framework for development of a business plan for establishing and operating the transportation system necessary to support a repository. Section I contains introductory material and defines the plan in terms of policy basis, purpose, and scope of business activities. Section II discusses the evolving strategy that will direct the Department's business actions and describes various strategy options that are under consideration. Also discussed in Section II is a process for the systematic development and acquisition of the transportation system. This process is based on a phased development approach with business activities divided into four stages: system definition; engineering development and certification; cask fleet procurement and carrier negotiations; and transportation operations. 8 figures, 2 tables

  19. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II [IT Corp., (United States); Reneau, M.; Morton, S.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  20. Technical approach document

    International Nuclear Information System (INIS)

    1989-12-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law 95-604 (PL95-604), grants the Secretary of Energy the authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards caused by inactive uranium mill sites. This Technical Approach Document (TAD) describes the general technical approaches and design criteria adopted by the US Department of Energy (DOE) in order to implement remedial action plans (RAPS) and final designs that comply with EPA standards. It does not address the technical approaches necessary for aquifer restoration at processing sites; a guidance document, currently in preparation, will describe aquifer restoration concerns and technical protocols. This document is a second revision to the original document issued in May 1986; the revision has been made in response to changes to the groundwater standards of 40 CFR 192, Subparts A--C, proposed by EPA as draft standards. New sections were added to define the design approaches and designs necessary to comply with the groundwater standards. These new sections are in addition to changes made throughout the document to reflect current procedures, especially in cover design, water resources protection, and alternate site selection; only minor revisions were made to some of the sections. Sections 3.0 is a new section defining the approach taken in the design of disposal cells; Section 4.0 has been revised to include design of vegetated covers; Section 8.0 discusses design approaches necessary for compliance with the groundwater standards; and Section 9.0 is a new section dealing with nonradiological hazardous constituents. 203 refs., 18 figs., 26 tabs

  1. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of environmental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Over the past three years, the Five Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. The Five-Year Plan is not exclusively focused on near-term activities. It also expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. This goal was established in response to recommendations from the State and Tribal Government Working Group (STGWG) that DOE define a specific end point for completing necessary remediation and restoration activities. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  2. Evidence-based dentistry for planning restorative treatments: barriers and potential solutions.

    Science.gov (United States)

    Afrashtehfar, K I; Eimar, H; Yassine, R; Abi-Nader, S; Tamimi, F

    2017-11-01

    Evidence-based dentistry (EBD) can help provide the best treatment option for every patient, however, its implementation in restorative dentistry is very limited. This study aimed at assessing the barriers preventing the implementation of EBD among dental undergraduate and graduate students in Montreal, and explore possible solutions to overcome these barriers. A cross-sectional survey was conducted by means of a paper format self-administrated questionnaire distributed among dental students. The survey assessed the barriers and potential solutions for implementation of an evidence-based practice. Sixty-one students completed the questionnaire. Forty-one percent of respondents found evidence-based literature to be the most reliable source of information for restorative treatment planning, however, only 16% used it. They considered that finding reliable information was difficult and they sometimes encountered conflicting information when consulting different sources. Dental students had positive attitudes towards the need for better access to evidence-based literature to assist learning and decision making in restorative treatment planning and to improve treatment outcomes. Even for dentists trained in EBD, online searching takes too much time, and even though it can provide information of better quality than personal intuition, it might not be enough to identify the best available evidence. Even though dental students are aware of the importance of EBD in restorative dentistry they rarely apply the concept, mainly due to time constraints. For this reason, implementation of EBD would probably require faster access to evidence-based knowledge. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  3. Site Outcomes Baseline Multi Year Work Plan Volume 1, River Corridor Restoration Baseline

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The River Corridor Restoration volume is a compilation of Hanford Site scope, which excludes the approximately 194 km 2 Central Plateau. The River Corridor scope is currently contractually assigned to Fluor Hanford, Bechtel Hanford, inc., DynCorp, and Pacific Northwest National Laboratory, and others. The purpose of this project specification is to provide an overall scoping document for the River Corridor Restoration volume, and to provide a link with the overall Hanford Site River Corridor scope. Additionally, this specification provides an integrated and consolidated source of information for the various scopes, by current contract, for the River Corridor Restoration Baseline. It identifies the vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards

  4. A cost/schedule and control system for the environmental restoration program Albuquerque Field Office

    International Nuclear Information System (INIS)

    Fiske, Wanda S.; Bischoff, Edward L.; Rea, Kenneth H.; Dwain Farley, P.; Biedermann, Charles A.

    1992-01-01

    The Department of Energy (DOE) Field Office Albuquerque (AL), Environmental Restoration Project Office (ERPO), has developed a project management system used to plan, document, and control Environmental Restoration (ER) work at eight installations and one superfund site managed by AL. This system emphasizes control of the cost, schedule, and technical elements of the Program. It supports programmatic documentation such as the Environmental Restoration/Waste Management Five-Year Plan, Site Specific Plan, and budget requests. The System provides information used to manage the ER Program at all levels of management (i.e., from low-level day-to-day activities to high-level upper management). The System requires substantial effort to ensure reliability; however, the benefit to ERPO is an effective, proactive project management tool. This paper provides an overview of the ERPO System, an explanation of how it is implemented, and lessons learned from this process. Application of the System to cost estimating, annual and five-year budget preparation, resource projections, scheduling, and cost/schedule performance measurement is discussed. Also discussed are cost/schedule review procedures, along with variance identification and resolution. Examples are taken from the Pinellas ER Program. (author)

  5. Anterior provisional restorations used to determine form, function, and esthetics for complex restorative situations, using all-ceramic restorative systems.

    Science.gov (United States)

    Reshad, Mamaly; Cascione, Domenico; Kim, Tae

    2010-02-01

    A technique is proposed for the restoration of a large and visible maxillary anterior defect. The importance of proper diagnosis, treatment planning, and communication is emphasized. Irreversible treatment should only be rendered once patient approval has been obtained through objective evaluation with provisional restorations. The techniques presented in this article use a combination of ceramic systems currently available to satisfy functional demands while achieving acceptable esthetics. A controlled series of steps, where the provisional restorative components are being replaced by the definitive ones is planned. The only difference between the provisional and definitive restorative components is the material used. The definitive restorations consisted of an implant-supported zirconium oxide framework. Individual pressed porcelain restorations were luted to the framework and a natural tooth. CLINICAL SIGNIFICANCE Provisional restorations allow an objective form of communication. Vertical and horizontal transitional lines can be effectively masked with appropriate treatment planning and a skilled ceramist. Many traditional dental laboratory steps may be eliminated or simplified without compromising the definitive restorations.

  6. Site and facility waste transportation services planning documents

    International Nuclear Information System (INIS)

    Ratledge, J.E.; Schmid, S.; Danese, L.

    1991-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities. The preparation and maintenance of Site- and Facility-Specific Transportation Services Planning Documents (SPDs) and Site-Specific Servicing Plans (SSSPs) provides a focus for advanced planning and the actual shipping of waste, as well as the overall development of transportation requirements for the waste transportation system. SPDs will be prepared for each of the affected nuclear waste facilities, with initial emphasis on facilities likely to be served during the earliest years of the Federal Waste Management System (FWMS) operations

  7. Documentation of databases in the Wilmar Planning tool

    International Nuclear Information System (INIS)

    Kiviluioma, J.; Meimbom, P.

    2006-01-01

    The Wilmar Planning tool consists of a number of databases and models as shown in Figure 1. This report documents the design of the following subparts of the Wilmar Planning tool: 1. The Scenario database holding the scenario trees generated from the Scenario Tree Creation model. 2. The Input database holding input data to the Joint Market model and the Long-term model apart from the scenario trees. 3. The output database containing the results of a Joint Market model run. The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (contract ENK5-CT-2002-00663). (LN)

  8. Documentation & Condition Mapping for Restoration & Revitalisation of Historic Sheesh Mahal & Char Bagh Complex in Patiala (punjab), India

    Science.gov (United States)

    Dasgupta, S.

    2017-08-01

    Located in the Northern State of Punjab, the historic city of Patiala has always been a centre of culture in north India, and has seen the evolution of its own distinct style of architecture with Rajput and Mughal influences. The city is renowned for its rich architectural heritage, Music, Craft, Sports and Cuisine. The fourth Maharaja Narinder Singh was a great patron of art, architecture and music and it was during his time that several palaces like the Moti Bagh Palace, Sheesh Mahal and Banasur Bagh were designed followed by Baradari Palace. Later it was Maharaja Bhupinder Singh (1900-1938) who made Patiala State famous with his lavish lifestyle.This paper describes the process followed for Documentation and condition assessment of the historic Sheesh Mahal & Char Bagh Complex in order to restore and revitalise the palace building and the Mughal garden. The exercise included Archival research, Field surveys, Condition Mapping, inventories using traditional methods as well as GIS and preparation of restoration & conservation solutions along with post conservation management manual. The Major challenges encountered were identifying the correct documentation methodology for mapping as well as managing the large database generated on site. The Documentation and Mapping was used as a significant tool to guide towards the conservation and Management strategy of the complex.

  9. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  10. Strategic plan and strategy of the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-06-01

    This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below

  11. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites

  12. Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor

    International Nuclear Information System (INIS)

    Beckman, W.H.; Cossel, S.C.; Alhadeff, N.; Lindamood, S.B.; Beers, J.A.

    1993-10-01

    The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor's (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor's management plan

  13. Consolidated Cab Display (CCD) System, Project Planning Document (PPD),

    Science.gov (United States)

    1981-02-01

    1980 1981 I 2 3 4 5 6 7 8 9 10 1112 1 2 3 4 5 6 7 8 9 1011112 1 2 31 12. Software Documentation a. Overall Computer Program Description ( OCPD ) b...Approve OCPD c. Computer Program Functional Specifications (CPFS) d. Data Base Table Design Specification (DBTDS) e. Software Interface Control Document...Parts List Master Pattern and Plan View Reproducible Drawings Instruction Book Training Aids/Materials b. Software: OCPD CPFS SI CD PDS DBTDS SDD

  14. Phased Restoration Plan for Degraded Land in North Korea by the Clustered Distribution Pattern of Suitable Afforestation Plants

    Science.gov (United States)

    Lee, S. G.; Lee, W. K.; Choi, H. A.; Yoo, H.; Song, C.; Son, Y.; Cha, S.; Bae, S. W.

    2017-12-01

    Degraded forest of North Korea (DPRK; The Democratic People's Republic of Koprea) is not only confined itself, it could cause serious problem in Korean Peninsula. The importance of restoration for degraded land has increased to improve an healthy ecosystem and solve a shortage of food in North Korea lately. On the other hand, although effort of North Korea government, degraded problem have consistently got worse. There are two main reasons it does not show effectively. The most critical one is absence of technique and information to restore, they concentrate urgent problem which is related to a poor food supply. The other problem is that they demand an efficiency plan in a short period. In these aspect, this study aims selecting suitable tree by spatial characteristics and establishing phased restoration plan to support policy decision about a degraded land in North Korea. The suitable tree for restoration is taken from references which involve natural plant distribution of North and South Korea (ROK; Republic of Korea). Optimal environmental predicted map is deducted from accumulated data of plant physiology whose endemic environmental optimal range individually. It is integrated a map by order of priorities that first is suitable tree species according to the region, and second is clustering distribution rate in a same species. The two types of priority is applied to weighting method. The research result shows that 23 afforestation species fit to restore, and lager distributed plants agree with the major species in Korean Peninsula. The integrated map considers weight of priorities, and it appears that Picea jezoensis is matched the widest. The integrated map shows a view of suitable restoration according to the space, but this is finespun to utilize in a policy. Therefore It provides 3 step plan to support policy decision by Block Statistics, as 12.5km (long-term general plan), 5km (medium-term detailed plan), 1km (short-term implementation plan).

  15. a Historical Timber Frame Model for Diagnosis and Documentation Before Building Restoration

    Science.gov (United States)

    Koehl, M.; Viale, A.; Reeb, S.

    2013-09-01

    The aim of the project that is described in this paper was to define a four-level timber frame survey mode of a historical building: the so-called "Andlau's Seigniory", Alsace, France. This historical building (domain) was built in the late XVIth century and is now in a stage of renovation in order to become a heritage interpretation centre. The used measurement methods combine Total Station measurements, Photogrammetry and 3D Terrestrial Laser scanner. Different modelling workflows were tested and compared according to the data acquisition method, but also according to the characteristics of the reconstructed model in terms of accuracy and level of detail. 3D geometric modelling of the entire structure was performed including modelling the degree of detail adapted to the needs. The described 3D timber framework exists now in different versions, from a theoretical and geometrical one up to a very detailed one, in which measurements and evaluation of deformation by time are potentially allowed. The virtually generated models involving archaeologists, architects, historians and specialists in historical crafts, are intended to be used during the four stages of the project: (i) knowledge of the current state of needs for diagnosis and understanding of former construction techniques; (ii) preparation and evaluation of restoration steps; (iii) knowledge and documentation concerning the archaeological object; (iv) transmission and dissemination of knowledge through the implementation of museum animations. Among the generated models we can also find a documentation of the site in the form of virtual tours created from panoramic photographs before and during the restoration works. Finally, the timber framework model was structured and integrated into a 3D GIS, where the association of descriptive and complementary digital documents was possible. Both offer tools leading to the diagnosis, the understanding of the structure, knowledge dissemination, documentation and the

  16. DOCUMENTATION & CONDITION MAPPING FOR RESTORATION & REVITALISATION OF HISTORIC SHEESH MAHAL & CHAR BAGH COMPLEX IN PATIALA (PUNJAB, INDIA

    Directory of Open Access Journals (Sweden)

    S. Dasgupta

    2017-08-01

    Full Text Available Located in the Northern State of Punjab, the historic city of Patiala has always been a centre of culture in north India, and has seen the evolution of its own distinct style of architecture with Rajput and Mughal influences. The city is renowned for its rich architectural heritage, Music, Craft, Sports and Cuisine. The fourth Maharaja Narinder Singh was a great patron of art, architecture and music and it was during his time that several palaces like the Moti Bagh Palace, Sheesh Mahal and Banasur Bagh were designed followed by Baradari Palace. Later it was Maharaja Bhupinder Singh (1900–1938 who made Patiala State famous with his lavish lifestyle.This paper describes the process followed for Documentation and condition assessment of the historic Sheesh Mahal & Char Bagh Complex in order to restore and revitalise the palace building and the Mughal garden. The exercise included Archival research, Field surveys, Condition Mapping, inventories using traditional methods as well as GIS and preparation of restoration & conservation solutions along with post conservation management manual. The Major challenges encountered were identifying the correct documentation methodology for mapping as well as managing the large database generated on site. The Documentation and Mapping was used as a significant tool to guide towards the conservation and Management strategy of the complex.

  17. Buried Waste Integrated Demonstration Plan

    International Nuclear Information System (INIS)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented

  18. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 575: Area 15 Miscellaneous Sites, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2014-12-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 575, Area 15 Miscellaneous Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 575 comprises the following four corrective action sites (CASs) located in Area 15 of the Nevada National Security Site: 15-19-02, Waste Burial Pit, 15-30-01, Surface Features at Borehole Sites, 15-64-01, Decontamination Area, 15-99-03, Aggregate Plant This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 575 using the SAFER process. Additional information will be obtained by conducting a field investigation to document and verify the adequacy of existing information, to affirm the predicted corrective action decisions, and to provide sufficient data to implement the corrective actions. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  19. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  20. Ecological Restoration of Coastal Sage Scrub and Its Potential Role in Habitat Conservation Plans.

    Science.gov (United States)

    BOWLER

    2000-07-01

    Extensive acreage loss of coastal sage scrub (CSS), isolation of surviving stands, and the federal listing of several animal species with obligate relationships to this plant community, particularly the threatened California gnatcatcher (Polioptila californica), have led to attempts to create CSS to mitigate habitat lost to urban development and other causes. Many of these creations lie within habitat conservation plan (HCP) sites, and they could play a more prominent role by being repositories for plants taken from a single site having site-specific genetics. Among others, one technique that increases initial resemblance to natural stands uses digitized, to-scale photography, which has been ground-truthed to verify vascular plant associations, which appear as mosaics on a landscape. A combination of placing patches of salvaged, mature canopy plants within larger matrices of imprinted or container plant plots appears to significantly enhance immediate use by CSS obligate bird species, accelerate "spread" or expansion of CSS, and can also introduce many epiphytic taxa that otherwise would be slow or unable to occupy developing CSS creations. Reptile, amphibian, butterfly, and rodent diversity in a salvaged canopy restoration case study at the University of California, Irvine, showed CSS species foraging and inhabiting transplanted canopy patches. Using restoration techniques to expand existing CSS stands has more promise than creating isolated patches, and the creation of canopies resembling CSS mid-fire cycle stands is now common. Gnatcatchers and other birds use restorations for foraging and occasional nesting, and in some cases created stands along "biological corridors" appear to be useful to bird movement. Patches of transplanted sage scrub shrubs along habitat edges appear to break up linear edge effects. There are no data on which long-term survival, succession, or postfire behavior can be predicted for CSS restoration sites, and postfire community changes

  1. Remote sensing for restoration planning: how the big picture can inform stakeholders

    Science.gov (United States)

    Susan Cordell; Erin J. Questad; Gregory P. Asner; Kealoha M. Kinney; Jarrod M. Thaxton; Amanda Uowolo; Sam Brooks; Mark W. Chynoweth

    2016-01-01

    The use of remote sensing in ecosystem management has transformed how land managers, practitioners, and policymakers evaluate ecosystem loss, gain, and change at multiple spatial and temporal scales. Less developed is the use of these spatial tools for planning, implementing, and evaluating ecosystem restoration projects and especially so in multifunctional...

  2. The DOE Office of Environmental Restoration and Waste Management comprehensive integrated planning process

    International Nuclear Information System (INIS)

    Aiken, R.J.; Draffin, C.W. Jr.; Pflock, K.T.

    1992-01-01

    This paper reports that comprehensive integrated planning is critical to the ultimate success of the DOE Office of Environmental Restoration and Waste Management's (EM) program because of the significant technical and institutional complexities, the tens of billions of dollars required, the regulatory and fiscal uncertainty, and the multitude of federal, state, and private sector organizations involved. Using the philosophy that sound and forward looking planning should guide budgetary and management decisionmaking, and that clear priorities are essential to program success, EM's comprehensive approach includes strategic planning, the annually updated EM Five-Year Plan, the EM Management Plan, and Site Specific Plans. Roadmaps (which facilitate issue identification and resolution), Activity Data Sheets, prioritization methodologies, and installation-specific Progress Charts are among the tools employed in support of the EM integrated planning process

  3. 30 CFR 746.13 - Decision document and recommendation on mining plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Decision document and recommendation on mining plan. 746.13 Section 746.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM REVIEW AND APPROVAL OF MINING PLANS § 746.13 Decision...

  4. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  5. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  6. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  7. Quantifying impact reduction due to avoidance, minimization and restoration for a natural gas pipeline in the Peruvian Andes

    International Nuclear Information System (INIS)

    Sahley, C.T.; Vildoso, B.; Casaretto, C.; Taborga, P.; Ledesma, K.; Linares-Palomino, R.; Mamani, G.; Dallmeier, F.; Alonso, A.

    2017-01-01

    We present monitoring methods and quantitative biodiversity data to document components of the mitigation hierarchy. We estimated avoidance, minimization, restoration and impact reduction in quality hectares for the 25 m wide right of way of a 408 km natural gas buried pipeline that crosses 14 Ecological Landscape Units (ELUs) in the tropical Andes of Peru. We found that applying the mitigation hierarchy as part of a comprehensive biodiversity action plan substantially reduced impacts on biodiversity in all habitats studied. Avoidance and right of way minimization contributed to significant impact reduction. We quantified impact reduction during construction and operation on the right of way of the pipeline over a five-year period and found that restoration was the greatest contributor to reducing impacts. We documented that most ELUs have a positive restoration trajectory. We also documented how monitoring over large scale spatial scales, in combination with site-specific monitoring, generated data for management to determine restoration priorities and impact mitigation. A biodiversity action plan that incorporated the mitigation hierarchy and a science-based biodiversity monitoring and assessment program contributed to biodiversity management of the project and played an important role in minimizing and managing impacts. - Highlights: •Quantitative data for mitigation hierarchy components are presented. •Application of the mitigation hierarchy reduced impacts on biodiversity. •A biodiversity monitoring program provided data to reduce impacts.

  8. Combining ecosystem services assessment with structured decision making to support ecological restoration planning.

    Science.gov (United States)

    Martin, David M; Mazzotta, Marisa; Bousquin, Justin

    2018-04-10

    Accounting for ecosystem services in environmental decision making is an emerging research topic. Modern frameworks for ecosystem services assessment emphasize evaluating the social benefits of ecosystems, in terms of who benefits and by how much, to aid in comparing multiple courses of action. Structured methods that use decision analytic-approaches are emerging for the practice of ecological restoration. In this article, we combine ecosystem services assessment with structured decision making to estimate and evaluate measures of the potential benefits of ecological restoration with a case study in the Woonasquatucket River watershed, Rhode Island, USA. We partnered with a local watershed management organization to analyze dozens of candidate wetland restoration sites for their abilities to supply five ecosystem services-flood water retention, scenic landscapes, learning opportunities, recreational opportunities, and birds. We developed 22 benefit indicators related to the ecosystem services as well as indicators for social equity and reliability that benefits will sustain in the future. We applied conceptual modeling and spatial analysis to estimate indicator values for each candidate restoration site. Lastly, we developed a decision support tool to score and aggregate the values for the organization to screen the restoration sites. Results show that restoration sites in urban areas can provide greater social benefits than sites in less urban areas. Our research approach is general and can be used to investigate other restoration planning studies that perform ecosystem services assessment and fit into a decision-making process.

  9. An Ecohydrological Approach to Riparian Restoration Planning in the American Southwest

    Science.gov (United States)

    Leverich, G. T.; Orr, B.; Diggory, Z.; Dudley, T.; Hatten, J.; Hultine, K. R.; Johnson, M. P.; Orr, D.

    2014-12-01

    restoration plan that highlights those areas of the river best suited for active restoration and, ultimately, assist watershed managers in development and prioritization of ecologically appropriate restoration strategies.

  10. Provisional Restorations – A Permanent Problem?

    Science.gov (United States)

    Keys, William F; Keirby, Naomi; Ricketts, David N J

    2016-12-01

    Provisional restorations play an important role when providing indirect restorations. There are a number of materials and techniques available for their construction. Careful planning and construction can protect the prepared tooth surface, improve the periodontal condition and help plan for the definitive restoration. A good provisional restoration can save time, money and effort. Clinical relevance: Provisional restoration construction is an integral part of the indirect restorative process for inlays, onlays, crowns and bridges.

  11. Delivering Regulatory Consents for Decommissioning and Restoration of the Dounreay Nuclear Licensed Site

    International Nuclear Information System (INIS)

    Crawford, R.W.; Zyda, P.W.

    2006-01-01

    On behalf of the Nuclear Decommissioning Authority (NDA) the United Kingdom Atomic Energy Authority (UKAEA) has implemented a strategy to translate the near-term Dounreay restoration plan into a suite of land use documents designed to deliver the necessary planning consents to decommission and restore the Dounreay Nuclear Licensed Site. The legal consents and authorizations required to enable UKAEA to commence major projects and progress the decommissioning of the site are highlighted along with the measures taken to secure political, public and regulatory acceptance at the earliest opportunity. The approach taken by UKAEA is explained, focusing particularly on the critical need to secure planning permission and stakeholder approval well before the onset of construction works. The intention is to realize the benefits of forging a close working relationship with the land use regulator, The Highland Council. UKAEA has taken an approach to suitably inform the planning authority, in particular, the production of the Dounreay Planning Framework (DPF) document. This paper describes the role and need for the DPF, focusing on the key purpose of amending the local development plan to secure supportive planning policies and to set a land use context for the subsequent site decommissioning and restoration. This also has the advantage of securing public acceptance through an established legal process. Strategic milestones subsequent to the Highland Council's adoption of the DPF are highlighted, including the submission of phased planning applications and compliance with environmental legislation generally. The paper describes and underscores the need for early engagement of other regulators in the planning process such as the Scottish Environment Protection Agency (SEPA), and the safety regulator, the Nuclear Installations Inspectorate (NII). It describes the linkages amongst land use consents, Best Practicable Environmental Options (BPEO), radioactive substances

  12. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    Science.gov (United States)

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  13. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    The US Department of Energy (DOE) understands that cleaning up the Nation's nuclear-related sites and facilities affects many different segments of the public, ranging from communities near DOE facilities to engineers concerned with developing new technologies to clean up the environment. In an effort to make the Environmental Restoration and Waste Management Five-Year Plan for Fiscal Years (FY) 1994--1998 more responsive to your concerns, DOE invites your comments on the plan. Volume II contains 37 Installation Summaries that provide a synopsis of past, present and future activities of each major installation, and Progress Charts

  14. Hazard classification of environmental restoration activities at the INEL

    International Nuclear Information System (INIS)

    Peatross, R.G.

    1996-04-01

    The following documents require that a hazard classification be prepared for all activities for which US Department of Energy (DOE) has assumed environmental, safety, and health responsibility: the DOE Order 5481.1B, Safety Analysis and Review System and DOE Order 5480.23, Nuclear Safety Analysis Reports. A hazard classification defines the level of hazard posed by an operation or activity, assuming an unmitigated release of radioactive and nonradioactive hazardous material. For environmental restoration activities, the release threshold criteria presented in Hazard Baseline Documentation (DOE-EM-STD-5502-94) are used to determine classifications, such as Radiological, Nonnuclear, and Other Industrial facilities. Based upon DOE-EM-STD-5502-94, environmental restoration activities in all but one of the sites addressed by the scope of this classification (see Section 2) can be classified as ''Other Industrial Facility''. DOE-EM-STD-5502-94 states that a Health and Safety Plan and compliance with the applicable Occupational Safety and Health Administration (OSHA) standards are sufficient safety controls for this classification

  15. Effectiveness of preoperative planning in the restoration of balance and view in ankylosing spondylitis

    NARCIS (Netherlands)

    Pigge, R.R.; Scheerder, F.J.; Smit, T.H.; Mullender, M.G.; van Royen, B.J.

    2008-01-01

    Object. The object of this study was to assess the effectiveness of preoperative planning in the restoration of balance and view angle in patients treated with lumbar osteotomy in ankylosing spondylitis (AS). Methods. The authors prospectively analyzed 8 patients with a thoracolumbar kyphotic

  16. Infrastructure system restoration planning using evolutionary algorithms

    Science.gov (United States)

    Corns, Steven; Long, Suzanna K.; Shoberg, Thomas G.

    2016-01-01

    This paper presents an evolutionary algorithm to address restoration issues for supply chain interdependent critical infrastructure. Rapid restoration of infrastructure after a large-scale disaster is necessary to sustaining a nation's economy and security, but such long-term restoration has not been investigated as thoroughly as initial rescue and recovery efforts. A model of the Greater Saint Louis Missouri area was created and a disaster scenario simulated. An evolutionary algorithm is used to determine the order in which the bridges should be repaired based on indirect costs. Solutions were evaluated based on the reduction of indirect costs and the restoration of transportation capacity. When compared to a greedy algorithm, the evolutionary algorithm solution reduced indirect costs by approximately 12.4% by restoring automotive travel routes for workers and re-establishing the flow of commodities across the three rivers in the Saint Louis area.

  17. Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project: FY 1994--FY 2001

    International Nuclear Information System (INIS)

    1993-12-01

    This Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993

  18. Landscape modeling for forest restoration planning and assessment: lessons from the Southern Appalachian Mountains

    Science.gov (United States)

    Weimin Xi; Robert N. Coulson; John D. Waldron; Maria D. Tchakerian; Charles W. Lafon; David M. Cairns; Andrew G. Birt; Kier D. Klepzig

    2009-01-01

    Restoration planning, evaluation, and implementation are important in areas where abiotic disturbances (e.g., wildfires, hurricanes, and ice storms), biotic disturbances (e.g., outbreaks of native and exotic invasive pests and diseases), and anthropogenic disturbances (e.g., harvesting, planting, and fire exclusion) have altered forest...

  19. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    International Nuclear Information System (INIS)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  20. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  1. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  2. Fernald restoration: ecologists and engineers integrate restoration and cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Woods, Eric; Homer, John

    2002-07-15

    As cleanup workers excavate pits and tear down buildings at the Fernald site in southwest Ohio, site ecologists are working side-by-side to create thriving wetlands and develop the early stages of forest, prairie, and savanna ecosystems to restore natural resources that were impacted by years of site operations. In 1998, the U.S. Department of Energy-Fernald Office (DOE-FN) and its cleanup contractor, Fluor Fernald, Inc., initiated several ecological restoration projects in perimeter areas of the site (e.g., areas not used for or impacted by uranium processing or waste management). The projects are part of Fernald's final land use plan to restore natural resources over 904 acres of the 1,050-acre site. Pete Yerace, the DOE-FN Natural Resource Trustee representative is working with the Fernald Natural Resource Trustees in an oversight role to resolve the state of Ohio's 1986 claim against DOE for injuries to natural resources. Fluor Fernald, Inc., and DOE-FN developed the ''Natural Resource Restoration Plan'', which outlines 15 major restoration projects for the site and will restore injured natural resources at the site. In general, Fernald's plan includes grading to maximize the formation of wetlands or expanded floodplain, amending soil where topsoil has been removed during excavation, and establishing native vegetation throughout the site. Today, with cleanup over 35 percent complete and site closure targeted for 2006, Fernald is entering a new phase of restoration that involves heavily remediated areas. By working closely with engineers and cleanup crews, site ecologists can take advantage of remediation fieldwork (e.g., convert an excavated depression into a wetland) and avoid unnecessary costs and duplication. This collaboration has also created opportunities for relatively simple and inexpensive restoration of areas that were discovered during ongoing remediation. To ensure the survival of the plant material in heavily

  3. Proceedings of the Columbia River Estuary Conference on Ecosystem Restoration.

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Bonneville Power Administration

    2008-08-01

    The 2008 Columbia River Estuary Conference was held at the Liberty Theater in Astoria, Oregon, on April 19-20. The conference theme was ecosystem restoration. The purpose of the conference was to exchange data and information among researchers, policy-makers, and the public, i.e., interrelate science with management. Conference organizers invited presentations synthesizing material on Restoration Planning and Implementation (Session 1), Research to Reduce Restoration Uncertainties (Session 2), Wetlands and Flood Management (Session 3), Action Effectiveness Monitoring (Session 4), and Management Perspectives (Session 5). A series of three plenary talks opened the conference. Facilitated speaker and audience discussion periods were held at the end of each session. Contributed posters conveyed additional data and information. These proceedings include abstracts and notes documenting questions from the audience and clarifying answers from the presenter for each talk. The proceedings also document key points from the discussion periods at the end of each session. The conference program is outlined in the agenda section. Speaker biographies are presented in Appendix A. Poster titles and authors are listed in Appendix B. A list of conference attendees is contained in Appendix C.

  4. Technical management plan for sample generation, analysis, and data review for Phase 2 of the Clinch River Environmental Restoration Program

    International Nuclear Information System (INIS)

    Brandt, C.C.; Benson, S.B.; Beeler, D.A.

    1994-03-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediation alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process

  5. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    OpenAIRE

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  6. Basic research for environmental restoration

    International Nuclear Information System (INIS)

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs

  7. Basic research for environmental restoration

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs.

  8. Application of ConceptDraw Office for planning, documenting, monitoring of operating processes

    International Nuclear Information System (INIS)

    Bocharnikov, O.P.; Savenko, S.V.; Nikiforov, N.S.

    2011-01-01

    ConceptDraw Office allows effectively deciding the following tasks: to carry out planning, designing, control of implementation of production processes; to prepare working documents (engineering diagrams, process flor diagrams, evacuation and emergency plans; to create dashboards with information for organization management; to distribute the organization resources with the purpose of increase of efficiency and safety of operating processes.

  9. Advance Care Planning Documentation in Electronic Health Records: Current Challenges and Recommendations for Change.

    Science.gov (United States)

    Lamas, Daniela; Panariello, Natalie; Henrich, Natalie; Hammes, Bernard; Hanson, Laura C; Meier, Diane E; Guinn, Nancy; Corrigan, Janet; Hubber, Sean; Luetke-Stahlman, Hannah; Block, Susan

    2018-04-01

    To develop a set of clinically relevant recommendations to improve the state of advance care planning (ACP) documentation in the electronic health record (EHR). Advance care planning (ACP) is a key process that supports goal-concordant care. For preferences to be honored, clinicians must be able to reliably record, find, and use ACP documentation. However, there are no standards to guide ACP documentation in the electronic health record (EHR). We interviewed 21 key informants to understand the strengths and weaknesses of EHR documentation systems for ACP and identify best practices. We analyzed these interviews using a qualitative content analysis approach and subsequently developed a preliminary set of recommendations. These recommendations were vetted and refined in a second round of input from a national panel of content experts. Informants identified six themes regarding current inadequacies in documentation and accessibility of ACP information and opportunities for improvement. We offer a set of concise, clinically relevant recommendations, informed by expert opinion, to improve the state of ACP documentation in the EHR.

  10. Clean Water Action Plan: Restoring and protecting America`s waters

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    On October 18, 1997, the 25th anniversary of the enactment of the Clean Water Act, the Vice President called for a renewed effort to restore and protect water quality. The Vice President asked that the Secretary of Agriculture and the Administrator of the Environmental Protection Agency (EPA), working with other affected agencies, develop a Clean Water Action Plan that builds on clean water successes and addresses three major goals: (1) enhanced protection from public health threats posed by water pollution; (2) more effective control of polluted runoff; and (3) promotion of water quality protection on a watershed basis.

  11. An Ecosystem-Based Approach to Habitat Restoration Projects with Emphasis on Salmonids in the Columbia River Estuary, 2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, G.; Thom, R.; Whiting, A. (Pacific Northwest National Laboratory)

    2003-11-01

    Habitat restoration in the Columbia River estuary (CRE) is an important off-site mitigation action in the 2000 Biological Opinion (BiOp), an operation of the Federal Columbia River Power System. The CRE, defined as the tidally influenced stretch of river from the mouth to Bonneville Dam 146 miles upstream, is part of the migration pathway for anadromous fish in the Columbia Basin, including salmon listed under the Endangered Species Act (ESA). Salmon in various stages of life, from fry to adults, use tidal channels and wetlands in the CRE to feed, find refuge from predators, and transition physiologically from freshwater to saltwater. Over the last 100 years, however, the area of some wetland habitats has decreased by as much as 70% because of dike and levee building, flow regulation, and other activities. In response to the decline in available habitat, the BiOp's Reasonable and Prudent Alternative (RPA) included mandates to 'develop a plan addressing the habitat needs of juvenile salmon and steelhead in the estuary' (RPA Action 159) and 'develop and implement an estuary restoration program with a goal of protecting and enhancing 10,000 acres of tidal wetlands and other key habitats' (RPA Action 160). To meet Action 159 and support Action 160, this document develops a science-based approach designed to improve ecosystem functions through habitat restoration activities in the CRE. The CRE habitat restoration program's goal and principles focus on habitat restoration projects in an ecosystem context. Since restoration of an entire ecosystem is not generally practical, individual habitat restoration projects have the greatest likelihood of success when they are implemented with an ecosystem perspective. The program's goal is: Implementation of well-coordinated, scientifically sound projects designed to enhance, protect, conserve, restore, and create 10,000 acres of tidal wetlands and other key habitats to aid rebuilding of ESA

  12. 77 FR 23741 - DEEPWATER HORIZON Oil Spill; Final Phase I Early Restoration Plan and Environmental Assessment

    Science.gov (United States)

    2012-04-20

    ... (Phase I ERP/EA) describing the first eight restoration projects selected by the Trustees to commence the... notice is to inform the public of the availability of the Phase I ERP/EA. ADDRESSES: Obtaining Documents: You may download the Phase I ERP/EA and the Framework Agreement at http://www.gulfspillrestoration...

  13. Valuing fire planning alternatives in forest restoration: using derived demand to integrate economics with ecological restoration.

    Science.gov (United States)

    Rideout, Douglas B; Ziesler, Pamela S; Kernohan, Nicole J

    2014-08-01

    Assessing the value of fire planning alternatives is challenging because fire affects a wide array of ecosystem, market, and social values. Wildland fire management is increasingly used to address forest restoration while pragmatic approaches to assessing the value of fire management have yet to be developed. Earlier approaches to assessing the value of forest management relied on connecting site valuation with management variables. While sound, such analysis is too narrow to account for a broad range of ecosystem services. The metric fire regime condition class (FRCC) was developed from ecosystem management philosophy, but it is entirely biophysical. Its lack of economic information cripples its utility to support decision-making. We present a means of defining and assessing the deviation of a landscape from its desired fire management condition by re-framing the fire management problem as one of derived demand. This valued deviation establishes a performance metric for wildland fire management. Using a case study, we display the deviation across a landscape and sum the deviations to produce a summary metric. This summary metric is used to assess the value of alternative fire management strategies on improving the fire management condition toward its desired state. It enables us to identify which sites are most valuable to restore, even when they are in the same fire regime condition class. The case study site exemplifies how a wide range of disparate values, such as watershed, wildlife, property and timber, can be incorporated into a single landscape assessment. The analysis presented here leverages previous research on environmental capital value and non-market valuation by integrating ecosystem management, restoration, and microeconomics. Copyright © 2014 Elsevier Ltd. All rights reserved.

  14. Overview of IAEA activities in restoration of former uranium mining and milling sites

    International Nuclear Information System (INIS)

    Falck, W.E.

    2000-01-01

    The IAEA has increasingly become concerned with the radiological and environmental impact of closed uranium mining and milling facilities. It is recognised that inappropriate practices in waste management and the lack of closeout plans have lead to environmental hazards and the potential for human exposure world-wide. In many instances the operators or those responsible for radiation and environmental protection lacked the experience in planning and executing remediation and restoration projects. Through a series of technical documents and other means, which are reviewed briefly in this paper, the IAEA strives to provide guidance and examples for the selection and application of adequate remediation technologies and restoration practices. Emphasis is put upon a comprehensive planning process leading to technology selection. This process commences with proper site characterisation on the basis of which a strategy is to be developed and finishes with post-closure monitoring as an integral instrument of quality control and quality assurance. (author)

  15. Overview of IAEA activities in restoration of former uranium mining and milling sites

    International Nuclear Information System (INIS)

    Falck, W.E.

    2002-01-01

    The IAEA has increasingly become concerned with the radiological and environmental impact of closed uranium mining and milling facilities. It is recognized that inappropriate practices in waste management and the lack of closeout plans have lead to environmental hazards and the potential for human exposure worldwide. In many instances the operators or those responsible for radiation and environmental protection lacked the experience in planning and executing remediation and restoration projects. Through a series of technical documents and other means, which are reviewed briefly in this paper, the IAEA strives to provide guidance and examples for the selection and application of adequate remediation technologies and restoration practices. Emphasis is put upon a comprehensive planning process leading to technology selection. This process commences with proper site characterisation on the basis of which a strategy is to be developed and finishes with post-closure monitoring as an integral instrument of quality control and quality assurance. (author)

  16. Documentation of the ground for the planned MERO-IKL oil pipeline using the remote sensing technique

    International Nuclear Information System (INIS)

    Kult, L.; Vavra, J.; Sara, V.

    1994-02-01

    Complete photographic documentation of the planned route for the Ingolstadt-Kralupy-Litvinov pipeline was obtained by remote sensing; the vegetation cover sites and their avitalities were identified and described. The documentation identifies areas of avital plants, and defines potentially hazardous sources of soil or water pollution along the planned route. (J.B.). 1 tab., 17 figs

  17. Westinghouse Hanford Company FY 1996 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1995-12-01

    The safe and sound operation of facilities and the storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The assumptions, plans and Special Nuclear Material (SNM) inventory summaries contained in this document were prepared for Department of Energy (DOE) use for interim and long- range planning. In accordance with Richland DOE field office (DOE-RL) direction, year-end inventory values were not projected over an 11 year period, as historically done in previous MMP documents. This decision was made since significant SNM movements to or from Hanford are not projected in the foreseeable future. Instead, the inventory summaries within this document reflect an ''as of date'' of June 30, 1995

  18. The quality of paper-based versus electronic nursing care plan in Australian aged care homes: A documentation audit study.

    Science.gov (United States)

    Wang, Ning; Yu, Ping; Hailey, David

    2015-08-01

    The nursing care plan plays an essential role in supporting care provision in Australian aged care. The implementation of electronic systems in aged care homes was anticipated to improve documentation quality. Standardized nursing terminologies, developed to improve communication and advance the nursing profession, are not required in aged care practice. The language used by nurses in the nursing care plan and the effect of the electronic system on documentation quality in residential aged care need to be investigated. To describe documentation practice for the nursing care plan in Australian residential aged care homes and to compare the quantity and quality of documentation in paper-based and electronic nursing care plans. A nursing documentation audit was conducted in seven residential aged care homes in Australia. One hundred and eleven paper-based and 194 electronic nursing care plans, conveniently selected, were reviewed. The quantity of documentation in a care plan was determined by the number of phrases describing a resident problem and the number of goals and interventions. The quality of documentation was measured using 16 relevant questions in an instrument developed for the study. There was a tendency to omit 'nursing problem' or 'nursing diagnosis' in the nursing process by changing these terms (used in the paper-based care plan) to 'observation' in the electronic version. The electronic nursing care plan documented more signs and symptoms of resident problems and evaluation of care than the paper-based format (48.30 vs. 47.34 out of 60, Ppaper-based system (Ppaper-based system. Omission of the nursing problem or diagnosis from the nursing process may reflect a range of factors behind the practice that need to be understood. Further work is also needed on qualitative aspects of the nurse care plan, nurses' attitudes towards standardized terminologies and the effect of different documentation practice on care quality and resident outcomes. Copyright

  19. Draft Updates to the Planning for Natural Disaster Debris Guidance and to Related Documents

    Science.gov (United States)

    EPA is requesting comment on the draft update of the Planning for Natural Disaster Debris Guidance, along with two other documents. This Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.

  20. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    International Nuclear Information System (INIS)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ''scores'' and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process

  1. Spatial variability and temporal changes in the trace metal content of soils: implications for mine restoration plan.

    Science.gov (United States)

    Chandra, Rachna; Prusty, B Anjan Kumar; Azeez, P A

    2014-06-01

    Trace metals in soils may be inherited from the parent materials or added to the system due to anthropogenic activities. In proposed mining areas, trace metals become an integral part of the soil system. Usually, researchers undertake experiments on plant species selection (for the restoration plan) only after the termination of mining activities, i.e. without any pre-mining information about the soil-plant interactions. Though not shown in studies, it is clear that several recovery plans remain unsuccessful while carrying out restoration experiments. Therefore, we hypothesize that to restore the area effectively, it is imperative to consider the pre-mining scenario of metal levels in parent material as well as the vegetation ecology of the region. With these specifics, we examined the concentrations of trace metals in parent soils at three proposed bauxite locations in the Eastern Ghats, India, and compared them at a spatio-temporal scale. Vegetation quantification and other basic soil parameters accounted for establishing the connection between soil and plants. The study recorded significant spatial heterogeneity in trace metal concentrations and the role of vegetation on metal availability. Oxidation reduction potential (ORP), pH and cation exchange capacity (CEC) directly influenced metal content, and Cu and Ni were lithogenic in origin. It implies that for effective restoration plant species varies for each geological location.

  2. 23 CFR 420.111 - What are the documentation requirements for use of FHWA planning and research funds?

    Science.gov (United States)

    2010-04-01

    ... and Research Funds § 420.111 What are the documentation requirements for use of FHWA planning and... 23 Highways 1 2010-04-01 2010-04-01 false What are the documentation requirements for use of FHWA planning and research funds? 420.111 Section 420.111 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF...

  3. Integration of the ecosystem services concept in planning documents from six municipalities in southwestern Sweden

    Directory of Open Access Journals (Sweden)

    Amanda C. Nordin

    2017-09-01

    Full Text Available The ecosystem services (ES concept refers to benefits that humanity receives from nature. Investigating how this concept has been embraced within urban planning is important when assessing the awareness of human dependence on natural functions and the potential for the ES concept to increase this awareness. We analyzed planning documents from three small and three large municipalities in southern Sweden to see how explicitly the ES concept was addressed and which individual services were mentioned. We found that five of the municipalities mentioned the ES concept explicitly and the remaining municipality addressed it implicitly. Comprehensive and green plans referred to the ES concept more explicitly than did plans that focused on a single issue. We used 23 individual ES as a reference; each was mentioned in at least one document, but those concerning habitat and recreation were mentioned most frequently. Individual ES were generally described at an elaborate level. No major differences were identified between large and small municipalities except that large ones mentioned more individual ES. Our study demonstrates that municipalities in southern Sweden have started to integrate the ES concept into their planning documents. However, there is great potential to increase and concretize the awareness of ES.

  4. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  5. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ''bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information at the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  6. Understanding and planning ecological restoration of plant-pollinator networks.

    Science.gov (United States)

    Devoto, Mariano; Bailey, Sallie; Craze, Paul; Memmott, Jane

    2012-04-01

    Theory developed from studying changes in the structure and function of communities during natural or managed succession can guide the restoration of particular communities. We constructed 30 quantitative plant-flower visitor networks along a managed successional gradient to identify the main drivers of change in network structure. We then applied two alternative restoration strategies in silico (restoring for functional complementarity or redundancy) to data from our early successional plots to examine whether different strategies affected the restoration trajectories. Changes in network structure were explained by a combination of age, tree density and variation in tree diameter, even when variance explained by undergrowth structure was accounted for first. A combination of field data, a network approach and numerical simulations helped to identify which species should be given restoration priority in the context of different restoration targets. This combined approach provides a powerful tool for directing management decisions, particularly when management seeks to restore or conserve ecosystem function. © 2012 Blackwell Publishing Ltd/CNRS.

  7. Mapping Ecological Processes and Ecosystem Services for Prioritizing Restoration Efforts in a Semi-arid Mediterranean River Basin

    Science.gov (United States)

    Trabucchi, Mattia; O'Farrell, Patrick J.; Notivol, Eduardo; Comín, Francisco A.

    2014-06-01

    Semi-arid Mediterranean regions are highly susceptible to desertification processes which can reduce the benefits that people obtain from healthy ecosystems and thus threaten human wellbeing. The European Union Biodiversity Strategy to 2020 recognizes the need to incorporate ecosystem services into land-use management, conservation, and restoration actions. The inclusion of ecosystem services into restoration actions and plans is an emerging area of research, and there are few documented approaches and guidelines on how to undertake such an exercise. This paper responds to this need, and we demonstrate an approach for identifying both key ecosystem services provisioning areas and the spatial relationship between ecological processes and services. A degraded semi-arid Mediterranean river basin in north east Spain was used as a case study area. We show that the quantification and mapping of services are the first step required for both optimizing and targeting of specific local areas for restoration. Additionally, we provide guidelines for restoration planning at a watershed scale; establishing priorities for improving the delivery of ecosystem services at this scale; and prioritizing the sub-watersheds for restoration based on their potential for delivering a combination of key ecosystem services for the entire basin.

  8. Mapping ecological processes and ecosystem services for prioritizing restoration efforts in a semi-arid Mediterranean river basin.

    Science.gov (United States)

    Trabucchi, Mattia; O'Farrell, Patrick J; Notivol, Eduardo; Comín, Francisco A

    2014-06-01

    Semi-arid Mediterranean regions are highly susceptible to desertification processes which can reduce the benefits that people obtain from healthy ecosystems and thus threaten human wellbeing. The European Union Biodiversity Strategy to 2020 recognizes the need to incorporate ecosystem services into land-use management, conservation, and restoration actions. The inclusion of ecosystem services into restoration actions and plans is an emerging area of research, and there are few documented approaches and guidelines on how to undertake such an exercise. This paper responds to this need, and we demonstrate an approach for identifying both key ecosystem services provisioning areas and the spatial relationship between ecological processes and services. A degraded semi-arid Mediterranean river basin in north east Spain was used as a case study area. We show that the quantification and mapping of services are the first step required for both optimizing and targeting of specific local areas for restoration. Additionally, we provide guidelines for restoration planning at a watershed scale; establishing priorities for improving the delivery of ecosystem services at this scale; and prioritizing the sub-watersheds for restoration based on their potential for delivering a combination of key ecosystem services for the entire basin.

  9. Documentation of a Model Action Plan to Deter Illicit Nuclear Trafficking

    International Nuclear Information System (INIS)

    Smith, D; Kristo, M; Niemeyer, S; Dudder, G

    2006-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures

  10. Documentation of a model action plan to deter illicit nuclear trafficking

    International Nuclear Information System (INIS)

    Smith, D.K.; Kristo, M.J.; Niemeyer, S.; Dudder, G.B.

    2008-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures. (author)

  11. 20 CFR 669.660 - What planning documents and information are required in the application for MSFW youth grants and...

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents and information are... PROGRAM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT The MSFW Youth Program § 669.660 What planning...? The required planning documents and other required information and the submission dates for filing are...

  12. 75 FR 22737 - Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River

    Science.gov (United States)

    2010-04-30

    ..., and Liability Act (CERCLA), 42 U.S.C. 9607(f), Section 311 of the Federal Water Pollution and Control... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River AGENCY: National Oceanic and Atmospheric...

  13. VT River Restoration Data in Lamoille County

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) Documented river and riparian buffer restoration projects in Lamoille County, Vermont. Restoration includes buffer plantings (trees and shrubs),...

  14. Comparisons of ANSI standards cited in the NRC standard review plan, NUREG-0800 and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

    1995-11-01

    This report provides the results of comparisons of the cited and latest versions of ANSI standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  15. Comparisons of ASTM standards cited in the NRC standard review plan, NUREG-0800 and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

    1995-10-01

    This report provides the results of comparisons of the cited and latest versions of ASTM standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  16. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  17. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2006-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 538: Spill Sites, Nevada Test Site, Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]). (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk. (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Division of Environmental Protection (NDEP) and where DOE will reach consensus with NDEP before beginning the next phase of work.

  18. Lower Red River Meadow Restoration Project : Biennial Report 1996-97.

    Energy Technology Data Exchange (ETDEWEB)

    LRK Communications; Wildlife Habitat Institute; Pocket Water, Inc.

    2003-07-01

    The Red River has been straightened and the riparian vegetation corridor eliminated in several reaches within the watershed. The river responded by incision resulting in over-steepened banks, increased sedimentation, elevated water temperatures, depressed groundwater levels, reduced floodplain function, and degraded fish habitat. The Lower Red River Meadow Restoration Project is a multi-phase ecosystem enhancement effort that restores natural physical and biological processes and functions to stabilize the stream channel and establish high quality habitats for fish and wildlife. A natural channel restoration philosophy guides the design and on the ground activities, allowing the channel to evolve into a state of dynamic equilibrium. Two years of planning, two years of restoration in Phases I and II, and one year post-restoration monitoring are complete. By excavating new bends and reconnecting historic meanders, Phase I and II channel realignment increased channel length by 3,060 feet, decreased channel gradient by 25 percent, and increased sinuosity from 1.7 to 2.3. Cross-sectional shapes and point bars were modified to maintain deep pool habitat at low flow and to reconnect the meadow floodplain. Improved soil moisture conditions will help sustain the 31,500 native riparian plantings reestablished within these two phases. Overall, short-term restoration performance was successful. Analyses of long-term parameters document either post-restoration baseline conditions or early stages of evolution toward desired conditions. An adaptive management strategy has helped to improve restoration designs, methods, and monitoring. Lessons learned are being transferred to a variety of audiences to advance the knowledge of ecological restoration and wise management of watersheds.

  19. Streamlined approach for environmental restoration (SAFER) plan for corrective action unit 412: clean slate I plutonium dispersion (TTR) tonopah test range, Nevada, revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K.

    2015-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 412. CAU 412 is located on the Tonopah Test Range and consists of a single corrective action site (CAS), TA-23-01CS, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1997 interim corrective action to recommend closure of CAU 412 using the SAFER process. Based on existing data, the presumed corrective action for CAU 412 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information and determine whether the CAU 412 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU.The following summarizes the SAFER activities that will support the closure of CAU 412:• Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information.• If no COCs are present, establish clean closure as the corrective action. • If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF).• Confirm the preferred closure option is sufficient to protect human health and the environment.

  20. Environmental Restoration Disposal Facility Waste Acceptance Criteria

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-06-01

    The Hanford Site is operated by the U. S. Department of Energy (DOE) with a primary mission of environmental cleanup and restoration. The Environmental Restoration Disposal Facility (ERDF) is an integral part of the DOE environmental restoration effort at the Hanford Site. The purpose of this document is to establish the ERDF waste acceptance criteria for disposal of materials resulting from Hanford Site cleanup activities. Definition of and compliance with the requirements of this document will enable implementation of appropriate measures to protect human health and the environment, ensure the integrity of the ERDF liner system, facilitate efficient use of the available space in the ERDF, and comply with applicable environmental regulations and DOE orders. To serve this purpose, the document defines responsibilities, identifies the waste acceptance process, and provides the primary acceptance criteria and regulatory citations to guide ERDF users. The information contained in this document is not intended to repeat or summarize the contents of all applicable regulations

  1. Evolution of Safety Basis Documentation for the Fernald Site

    International Nuclear Information System (INIS)

    Brown, T.; Kohler, S.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    The objective of the Department of Energy's (DOE) Fernald Closure Project (FCP), in suburban Cincinnati, Ohio, is to safely complete the environmental restoration of the Fernald site by 2006. Over 200 out of 220 total structures, at this DOE plant site which processed uranium ore concentrates into high-purity uranium metal products, have been safely demolished, including eight of the nine major production plants. Documented Safety Analyses (DSAs) for these facilities have gone through a process of simplification, from individual operating Safety Analysis Reports (SARs) to a single site-wide Authorization Basis containing nuclear facility Bases for Interim Operations (BIOs) to individual project Auditable Safety Records (ASRs). The final stage in DSA simplification consists of project-specific Integrated Health and Safety Plans (I-HASPs) and Nuclear Health and Safety Plans (N-HASPs) that address all aspects of safety, from the worker in the field to the safety basis requirements preserving the facility/activity hazard categorization. This paper addresses the evolution of Safety Basis Documentation (SBD), as DSAs, from production through site closure

  2. Restoration planning to guide Aichi targets in a megadiverse country.

    Science.gov (United States)

    Tobón, Wolke; Urquiza-Haas, Tania; Koleff, Patricia; Schröter, Matthias; Ortega-Álvarez, Rubén; Campo, Julio; Lindig-Cisneros, Roberto; Sarukhán, José; Bonn, Aletta

    2017-10-01

    Ecological restoration has become an important strategy to conserve biodiversity and ecosystems services. To restore 15% of degraded ecosystems as stipulated by the Convention on Biological Diversity Aichi target 15, we developed a prioritization framework to identify potential priority sites for restoration in Mexico, a megadiverse country. We used the most current biological and environmental data on Mexico to assess areas of biological importance and restoration feasibility at national scale and engaged stakeholders and experts throughout the process. We integrated 8 criteria into 2 components (i.e., biological importance and restoration feasibility) in a spatial multicriteria analysis and generated 11 scenarios to test the effect of assigning different component weights. The priority restoration sites were distributed across all terrestrial ecosystems of Mexico; 64.1% were in degraded natural vegetation and 6% were in protected areas. Our results provide a spatial guide to where restoration could enhance the persistence of species of conservation concern and vulnerable ecosystems while maximizing the likelihood of restoration success. Such spatial prioritization is a first step in informing policy makers and restoration planners where to focus local and large-scale restoration efforts, which should additionally incorporate social and monetary cost-benefit considerations. © 2017 The Authors. Conservation Biology published by Wiley Periodicals, Inc. on behalf of Society for Conservation Biology.

  3. Setting standards of restorative justice

    Directory of Open Access Journals (Sweden)

    Kostić Miomira

    2007-01-01

    Full Text Available In the article the author deals with the basic theoretical statements and discussions about the practical use of restorative justice. She discusses the questions of introducing and application of restorative justice in order to reach the balance of interests between a victim, society and a delinquent. There is no unique statement about the restorative justice concept, so the authors make this concept by listing certain activities with rispect of standards and principles. Also she emphasizes the values of restorative justice process. A part of the article is dedicated to the standards for restorative justice that are harmonized with the international documents of human rights. .

  4. 78 FR 25762 - Notice of Availability of the Final Trail Management Plan/Final Environmental Impact Statement...

    Science.gov (United States)

    2013-05-02

    ... Vaughn Road, Brecksville, Ohio 44141. The document is also available on the internet at the NPS Planning... paddling and parking areas, and guidance for the restoration and sustainability of the trail system for the...

  5. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information and process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  6. Cluster Concept in Policy Planning Documents: the Cases of Latvia and Northern Cyprus

    Directory of Open Access Journals (Sweden)

    Zanete Garanti

    2014-06-01

    Full Text Available Cluster­based entrepreneurship plays an important role in the economy of the 21st century. A regional cluster can be defined as a combination of 5 dimensions – single sector enterprises that cooperate and compete; supportive enterprises from a wide range of sectors; public and government institutions interested in economic development of the sector and region; other institutions, like research, education, finance and others and the fifth is regional dimension, which combines all four previously mentioned dimensions into one region. From the literature review standpoint, the findings of the authors show that cluster ­based entrepreneurship has an important role in stimulating the firm’s performance, competitiveness and innovation. Authors’ findings show that cluster concept is implemented in the EU policy planning documents at all levels, while in the country level cluster policy is not a single policy issue, but is implemented in industry, regional and other policy aspects. Example from Latvia shows that in recent years cluster­based entrepreneurship plays an important, if not central, role in policy planning documents, while evidence from Northern Cyprus shows that the importance attached to the concept of cluster­based economic development has not yet surfaced in the policy documents. Learning from experience of the EU and Latvia, the authors in cooperation with experts from University of Mediterranean Karpasia suggest policy makers in Northern Cyprus to implement cluster­based entrepreneur­ ship ideas in the policy documents using the bottom­up approach. In this way cluster based entrepreneurship is implemented in policy planning documents in Northern Cyprus at region, industry and national level. This paper is the first attempt towards cluster concept recognition in Northern Cyprus and therefore the topic is opened for further discussions and recommendations. The target audience of this paper is policy makers in Northern Cyprus

  7. Environmental restoration at the Pantex Plant. Quarterly progress report, April 12, 1995--June 30, 1995

    International Nuclear Information System (INIS)

    Charbeneau, R.J.

    1995-01-01

    This report summarizes the Work Plans for activities associated with Environmental Restoration of the perched aquifer and contaminated soils at the Pantex Plant. The Higher Education Consortium/Pantex Research Laboratory is participating in the Consortium Grant to evaluate subsurface remediation alternatives for the perched aquifer at the Pantex Plant. Research activities will develop site characterization data and evaluate remediation alternatives for the perched aquifer and the overlying vadose zone. The work plans cover research activities for the remainder of FY95, and proposed activities for FY96 and thereafter. A separate document will present more detailed plans for FY96 activities and budget requirements

  8. Expert Meeting on National Planning of Documentation and Library Services in Africa (Kampala, Uganda, 7-15 December 1970). Final Report.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    The three objectives of this meeting are: (1) to evolve principles for the national planning of documentation and library services in African countries in relation to social, economic and educational plans; (2) to assess the documentation and library needs of African States and correlate a plan of development of these services for the region with…

  9. a Restoration Oriented Hbim System for Cultural Heritage Documentation: the Case Study of Parma Cathedral

    Science.gov (United States)

    Bruno, N.; Roncella, R.

    2018-05-01

    The need to safeguard and preserve Cultural Heritage (CH) is increasing and especially in Italy, where the amount of historical buildings is considerable, having efficient and standardized processes of CH management and conservation becomes strategic. At the time being, there are no tools capable of fulfilling all the specific functions required by Cultural Heritage documentation and, due to the complexity of historical assets, there are no solution as flexible and customizable as CH specific needs require. Nevertheless, BIM methodology can represent the most effective solution, on condition that proper methodologies, tools and functions are made available. The paper describes an ongoing research on the implementation of a Historical BIM system for the Parma cathedral, aimed at the maintenance, conservation and restoration. Its main goal was to give a concrete answer to the lack of specific tools required by Cultural Heritage documentation: organized and coordinated storage and management of historical data, easy analysis and query, time management, 3D modelling of irregular shapes, flexibility, user-friendliness, etc. The paper will describe the project and the implemented methodology, focusing mainly on survey and modelling phases. In describing the methodology, critical issues about the creation of a HBIM will be highlighted, trying to outline a workflow applicable also in other similar contexts.

  10. Clean Slate 1 revegetation and monitoring plan

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim cleanup of radionuclide-contaminated surface soil at the Clean Slate 1 site (located on the Tonopah Test Range). This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the Double Tracks cleanup site in the fall of 1994 to evaluate the performance of several native plant species and to evaluate different irrigation strategies. Results of that study, and the results from numerous other studies conducted at other sites (Area 11 and Area 19 of the Nevada Test Site), have been summarized and incorporated into this final reclamation plan for the cleanup of the Clean Slate 1 site. The plan also contains procedures for monitoring both short-term and long-term reclamation

  11. Authenticity and Restoration: The Benefits of Historical Studies on Re-Examining the Implemented Restorations in Persepolis

    Directory of Open Access Journals (Sweden)

    Mahdi Motamedmanesh

    2016-03-01

    Full Text Available Preserving the authenticity of historical monuments is an inseparable part of restoration activities that has always been asserted by the international principles of historical preservation. However, the local condition of historical sites may influence such a primitive intention of restorers. While historical documents are appropriate sources which can provide restorers with the real condition of ancient structures in the course of time, investigation through these precious materials is a time-consuming process and the reliability of these old evidences is, itself, a challenging issue. The Italian Institute for Middle and Far East (IsMEO missioned long-term restoration activities in Persepolis between 1964 and the Islamic Revolution in Iran. Generally, this institute is praised for this series of projects. In this paper, the author questions the historical authenticity of restoration activities missioned by this institute in a structure so-called The Gate of All Nations. Indeed, the restoration of this structure was influenced by the 2500th anniversary of the Persian Empire, which was held in Persepolis in 1971. By tracing the context of historical evidences and presenting a method for obtaining the authenticity of these documents, this paper demonstrates a new perspective towards the arrangement of a stone-made capital, which ornaments the uppermost part of a re-erected ancient column.

  12. Forward-looking farmers owning multiple potential wetland restoration sites: implications for efficient restoration

    Science.gov (United States)

    Schroder (Kushch), Svetlana; Lang, Zhengxin; Rabotyagov, Sergey

    2018-04-01

    Wetland restoration can increase the provision of multiple non-market ecosystem services. Environmental and socio-economic factors need to be accounted for when land is withdrawn from agriculture and wetlands are restored. We build multi-objective optimization models to provide decision support for wetland restoration in the Le Sueur river watershed in Southern Minnesota. We integrate environmental objectives of sediment reduction and habitat protection with socio-economic factors associated with the overlap of private land with potential wetland restoration sites in the watershed and the costs representing forward-looking farmers voluntarily taking land out of agricultural production in favor of wetland restoration. Our results demonstrate that the inclusion of these factors early on in the restoration planning process affects both the total costs of the restoration project and the spatial distribution of optimally selected wetland restoration sites.

  13. Smile design: rules, tools and strategies to help plan aesthetic restorative dentistry.

    Science.gov (United States)

    Holyoak, Matthew

    2013-10-01

    This article is intended to provide dentists with a framework to help in objectively assessing upper anterior aesthetic restorations. Not all of the areas discussed will be equally important in all cases, and a degree of subjectivity, based on clinical experience, is essential. There has been a huge increase in settlements in cases when aesthetic treatment has not led to patient satisfaction. The author hopes that this type of approach, in conjunction with good patient communication and detailed records, will minimise the potential for litigation, should problems arise. Success or failure is largely defined during the planning stage.

  14. A Systematic Study of Zerbar Lake Restoration

    Science.gov (United States)

    Hosseini, Reza; Oveis Torabi, Seyed; Forman Asgharzadeh, Deonna

    2017-04-01

    The beautiful lake of Zerbar, located near Marivan City at the west of Iran, is a freshwater lake with an area of 20 km2 and average depth of 5 meters. The lake is created by regional tectonic activities and is mainly fed with natural spring water from bottom. During the past three decades, regional development has caused much disturbance to the natural environment of the lake and its watershed. Rescuing the lake is crucial to the sustainability of the whole region. The study of Zerbar Restoration was performed with the aim to restore its health indicators. Variety of human activities in the watershed, as well as the multidisciplinary nature of lake restoration studies, made it necessary to develop a systematic approach to conduct the study. In Step I of restoration studies, satellite images were investigated to identify the historical changes of watershed during the past 30 years. Meanwhile, documents since 50 years ago were studied. Results indicate that farmland and graze land areas have been relatively constant during the past 50 years. Also, the area of lake, its riparian canes and floating plants have not changed much. In fact, the only significant land use change observed was the significant spread of Marivan City that has stretched toward the lake. The main physical variation to the lake has been elevating the southern edge of the lake by a constructing a landfill dam which was done to control the lake's overflow discharge for irrigation of downstream farmland development. Step II consists of studies performed by disciplines of water resources, hydrogeology, water quality, wetland and watershed ecology, agriculture, animal farming and fishery. Study results indicate that eutrophication (TSL>100), mainly caused by sewage from Marivan City and the surrounding rural areas has been the main reason for lake ecosystem degradation. DPSIR framework, as a novel approach in lake restoration, was applied to synthesize the study results of different disciplines in a

  15. THREE DIMENSIONAL MODELING VIA PHOTOGRAPHS FOR DOCUMENTATION OF A VILLAGE BATH

    Directory of Open Access Journals (Sweden)

    H. B. Balta

    2013-07-01

    Full Text Available The aim of this study is supporting the conceptual discussions of architectural restoration with three dimensional modeling of monuments based on photogrammetric survey. In this study, a 16th century village bath in Ulamış, Seferihisar, and Izmir is modeled for documentation. Ulamış is one of the historical villages within which Turkish population first settled in the region of Seferihisar – Urla. The methodology was tested on an antique monument; a bath with a cubical form. Within the limits of this study, only the exterior of the bath was modeled. The presentation scale for the bath was determined as 1 / 50, considering the necessities of designing structural interventions and architectural ones within the scope of a restoration project. The three dimensional model produced is a realistic document presenting the present situation of the ruin. Traditional plan, elevation and perspective drawings may be produced from the model, in addition to the realistic textured renderings and wireframe representations. The model developed in this study provides opportunity for presenting photorealistic details of historical morphologies in scale. Compared to conventional drawings, the renders based on the 3d models provide an opportunity for conceiving architectural details such as color, material and texture. From these documents, relatively more detailed restitution hypothesis can be developed and intervention decisions can be taken. Finally, the principles derived from the case study can be used for 3d documentation of historical structures with irregular surfaces.

  16. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  17. TECHNICAL DOCUMENT PREPARATION PLAN FOR THE RETRIEVABILITY STRATEGY REPORT

    International Nuclear Information System (INIS)

    P.D. Gehner

    1997-01-01

    The objective of this systems study is to produce a waste removability strategy document that contains sufficient details, recommended design alternatives, and the technical rationale (a) to support Licensing in the development of the License Application Plan, and (b) to provide input in the form of design requirements, for the FY 97 Retrieval Design & Operation activity in support of viability assessment. The intent of this systems study is to support a decision on how to proceed with design with respect to retrievability, regarding the extent to which the repository/waste package designs should accommodate the retrieval option

  18. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  19. Management plan documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 2

    Science.gov (United States)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.

  20. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  1. Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

    1995-03-01

    This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency's (EPA's) guidance. Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created

  2. Feasibility of online IMPT adaptation using fast, automatic and robust dose restoration

    Science.gov (United States)

    Bernatowicz, Kinga; Geets, Xavier; Barragan, Ana; Janssens, Guillaume; Souris, Kevin; Sterpin, Edmond

    2018-04-01

    Intensity-modulated proton therapy (IMPT) offers excellent dose conformity and healthy tissue sparing, but it can be substantially compromised in the presence of anatomical changes. A major dosimetric effect is caused by density changes, which alter the planned proton range in the patient. Three different methods, which automatically restore an IMPT plan dose on a daily CT image were implemented and compared: (1) simple dose restoration (DR) using optimization objectives of the initial plan, (2) voxel-wise dose restoration (vDR), and (3) isodose volume dose restoration (iDR). Dose restorations were calculated for three different clinical cases, selected to test different capabilities of the restoration methods: large range adaptation, complex dose distributions and robust re-optimization. All dose restorations were obtained in less than 5 min, without manual adjustments of the optimization settings. The evaluation of initial plans on repeated CTs showed large dose distortions, which were substantially reduced after restoration. In general, all dose restoration methods improved DVH-based scores in propagated target volumes and OARs. Analysis of local dose differences showed that, although all dose restorations performed similarly in high dose regions, iDR restored the initial dose with higher precision and accuracy in the whole patient anatomy. Median dose errors decreased from 13.55 Gy in distorted plan to 9.75 Gy (vDR), 6.2 Gy (DR) and 4.3 Gy (iDR). High quality dose restoration is essential to minimize or eventually by-pass the physician approval of the restored plan, as long as dose stability can be assumed. Motion (as well as setup and range uncertainties) can be taken into account by including robust optimization in the dose restoration. Restoring clinically-approved dose distribution on repeated CTs does not require new ROI segmentation and is compatible with an online adaptive workflow.

  3. No post-no core approach to restore severely damaged posterior teeth: An up to 10-year retrospective study of documented endocrown cases.

    Science.gov (United States)

    Belleflamme, Marcia M; Geerts, Sabine O; Louwette, Marie M; Grenade, Charlotte F; Vanheusden, Alain J; Mainjot, Amélie K

    2017-08-01

    The objectives of the present study were to (1) retrospectively evaluate documented cases of ceramic and composite endocrowns performed using immediate dentin sealing (IDS); (2) correlate failures with clinical parameters such as tooth preparation characteristics and occlusal parameters. 99 documented cases of endocrowns were evaluated after a mean observation period of 44.7±34.6months. A classification of restorations was established in function of the level of damage of residual tooth tissues after preparation, from 1 to 3. Evaluation was performed according to FDI criteria and endodontic outcomes were analyzed. Occlusal risk factors were examined and fractographic analysis was performed in case of fracture. 48.4% of patients were shown to present occlusal risk factors. 75.8% of restorations were Class 3 endocrowns. 56.6% were performed on molars, 41.4% on premolars and 2.0% on canines. 84.8% were performed in lithium-disilicate glass-ceramic and 12.1% in Polymer-Infiltrated Ceramic Network (PICN) material. The survival and success rates of endocrowns were 99.0% and 89.9% respectively, while the 10-year Kaplan-Meier estimated survival and success rates were 98.8% and 54.9% respectively. Ten failures were detected: periodontal disease (n=3), endocrown debonding (n=2), minor chipping (n=2), caries recurrence (n=2) and major fractures (n=1). Due to the reduced amount of failures, no statistical correlation could be established with clinical parameters. Endocrowns were shown to constitute a reliable approach to restore severely damaged molars and premolars, even in the presence of extensive coronal tissue loss or occlusal risk factors, such as bruxism or unfavorable occlusal relationships. Practitioners should consider the endocrown instead of the post and core approach to restore severely damaged non-vital posterior teeth. This minimally invasive solution reduces the risk of catastrophic failures and is easily performed. The use of IDS procedure and lithium

  4. Policy Document on Earth Observation for Urban Planning and Management: State of the Art and Recommendations for Application of Earth Observation in Urban Planning

    Science.gov (United States)

    Nichol, Janet; King, Bruce; Xiaoli, Ding; Dowman, Ian; Quattrochi, Dale; Ehlers, Manfred

    2007-01-01

    A policy document on earth observation for urban planning and management resulting from a workshop held in Hong Kong in November 2006 is presented. The aim of the workshop was to provide a forum for researchers and scientists specializing in earth observation to interact with practitioners working in different aspects of city planning, in a complex and dynamic city, Hong Kong. A summary of the current state of the art, limitations, and recommendations for the use of earth observation in urban areas is presented here as a policy document.

  5. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document

  6. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  7. Wetland restoration, flood pulsing, and disturbance dynamics

    Science.gov (United States)

    Middleton, Beth A.

    1999-01-01

    While it is generally accepted that flood pulsing and disturbance dynamics are critical to wetland viability, there is as yet no consensus among those responsible for wetland restoration about how best to plan for those phenomena or even whether it is really necessary to do so at all. In this groundbreaking book, Dr. Beth Middleton draws upon the latest research from around the world to build a strong case for making flood pulsing and disturbance dynamics integral to the wetland restoration planning process.While the initial chapters of the book are devoted to laying the conceptual foundations, most of the coverage is concerned with demonstrating the practical implications for wetland restoration and management of the latest ecological theory and research. It includes a fascinating case history section in which Dr. Middleton explores the restoration models used in five major North American, European, Australian, African, and Asian wetland projects, and analyzes their relative success from the perspective of flood pulsing and disturbance dynamics planning.Wetland Restoration also features a wealth of practical information useful to all those involved in wetland restoration and management, including: * A compendium of water level tolerances, seed germination, seedling recruitment, adult survival rates, and other key traits of wetland plant species * A bibliography of 1,200 articles and monographs covering all aspects of wetland restoration * A comprehensive directory of wetland restoration ftp sites worldwide * An extensive glossary of essential terms

  8. Bechtel Hanford, Inc. Network Security Plan for the Environmental Restoration Contract

    International Nuclear Information System (INIS)

    Slade, B.E.

    2000-01-01

    This document was created to address ERC computer security needs that are outlined by DOE Order 1360.2B, Unclassified Computer Security Program. DOE Order 1360.2B has been canceled and replaced with DOE Notice 205.1, Unclassified Cyber Security Program. The ERC response to DOE Notice 205.1 is to generate BHI-01343, Cyber Security Program Plan, which is not available for public access or viewing

  9. Survey and Restoration

    Science.gov (United States)

    Mileto, C.; Vegas, F.

    2017-05-01

    In addition to the technological evolution over the last two centuries, survey has experienced two main conceptual leaps: the introduction of photography as a tool for an indiscriminate register for reality, and the shift from autographic to allographic survey, phenomena which can generate a distancing effect within the restoration process. Besides, this text presents the relationship between survey in its numerous forms and technologies (manual and semi-manual to more complex ones like scanner-laser) and the restoration of the building, either for establishing a diagnosis, operating or valorizating, illustrating it with examples developed by the authors, as well as the criteria to be applied when documenting a building to be restored, irrespective of the means and technology available in each case.

  10. SURVEY AND RESTORATION

    Directory of Open Access Journals (Sweden)

    C. Mileto

    2017-05-01

    Full Text Available In addition to the technological evolution over the last two centuries, survey has experienced two main conceptual leaps: the introduction of photography as a tool for an indiscriminate register for reality, and the shift from autographic to allographic survey, phenomena which can generate a distancing effect within the restoration process. Besides, this text presents the relationship between survey in its numerous forms and technologies (manual and semi-manual to more complex ones like scanner-laser and the restoration of the building, either for establishing a diagnosis, operating or valorizating, illustrating it with examples developed by the authors, as well as the criteria to be applied when documenting a building to be restored, irrespective of the means and technology available in each case.

  11. Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan.

  12. Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range

    International Nuclear Information System (INIS)

    1996-09-01

    This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan

  13. Comment and response document for the long-term surveillance plan for the Falls City disposal site, Falls City, Texas

    International Nuclear Information System (INIS)

    1996-11-01

    This is the Comment and Response Document dated November 1996 for the Long-Term Surveillance Plan for the Falls City Disposal Site in Falls City, Texas. The site is part of the U.S. DOE's Uranium Mill Tailings Remedial Action Project (UMTRA). Several comments regarding the hydrology and surface erosion described in the Long-Term Surveillance Plan are addressed in this document

  14. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  15. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  16. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project

  17. Assessing the value of the Central Everglades Planning Project (CEPP) in Everglades restoration: an ecosystem service approach

    Science.gov (United States)

    Richardson, Leslie A.; Keefe, Kelly; Huber, Christopher C.; Racevskis, Laila; Gregg, Reynolds; Thourot, Scott; Miller, Ian

    2014-01-01

    This study identifies a full range of ecosystem services that could be affected by a restoration project in the central Everglades and monetizes the economic value of a subset of these services using existing data. Findings suggest that the project will potentially increase many ecosystem services that have considerable economic value to society. The ecosystem services monetized within the scope of this study are a subset of the difference between the future-with the Central Everglades Planning Project (CEPP) and the future-without CEPP, and they totaled ~ $1.8 billion USD at a 2.5% discount rate. Findings suggest that the use of ecosystem services in project planning and communications may require acknowledgment of the difficulty of monetizing important services and the limitations associated with using only existing data and models. Results of this study highlight the need for additional valuation efforts in this region, focused on those services that are likely to be impacted by restoration activities but were notably challenging to value in this assessment due to shortages of data.

  18. Test plan guidance for transuranic-contaminated arid landfill remedial technology development

    International Nuclear Information System (INIS)

    Evans, J.; Shaw, P.

    1995-05-01

    This document provides guidance for preparing plans to test or demonstrate buried waste assessment or remediation technologies supported by the U.S. Department of Energy's Landfill Stabilization Focus Area, Transuranic-Contaminated Arid Landfill Product Line. This document also provides guidance for development of data quality objectives, along with the necessary data to meet the project objectives. The purpose is to ensure that useful data of known quality are collected to support conclusions associated with the designated demonstration or test. A properly prepared test plan will integrate specific and appropriate objectives with needed measurements to ensure data will reflect the Department of Energy Office of Technology Development's mission, be consistent with Landfill Stabilization Focus Area test goals, and be useful for the Department of Energy Environmental Restoration and Waste Management programs and other potential partners (e.g., commercial concerns). The test plan becomes the planning and working document for the demonstration or test to be conducted ensuring procedures are followed that will allow data of sufficient quality to be collected for comparison and evaluation

  19. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ``Environmental Restoration`` for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation. Refs, figs, tabs.

  20. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    International Nuclear Information System (INIS)

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ''Environmental Restoration'' for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation

  1. Ecological Restoration: Guidance from Theory

    Directory of Open Access Journals (Sweden)

    Joy Zedler

    2005-09-01

    Full Text Available A review of the science and practice of ecosystem restoration led me to identify key ecological theories and concepts that are relevant to planning, implementing, and sustaining restoration efforts. From experience with actual restoration projects, I provide guidance for improving the restoration process. Despite an abundance of theory and guidance, restoration goals are not always achieved, and pathways toward targets are not highly predictable. This is understandable, since each restoration project has many constraints and unique challenges. To improve restoration progress, I advise that sites be designed as experiments to allow learning while doing. At least the larger projects can be restored in phases, each designed as experimental treatments to test alternative restoration approaches. Subsequent phases can then adopt one or more of the treatments that best achieved goals in earlier phases while applying new tests of other restoration measures. Both science and restoration can progress simultaneously. This phased, experimental approach (called “adaptive restoration” is an effective tool for improving restoration when monitoring, assessment, interpretation and research are integrated into the process.

  2. Lessons Learned from the First Decade of Adaptive Management in Comprehensive Everglades Restoration

    Directory of Open Access Journals (Sweden)

    Andrew J. LoSchiavo

    2013-12-01

    Full Text Available Although few successful examples of large-scale adaptive management applications are available to ecosystem restoration scientists and managers, examining where and how the components of an adaptive management program have been successfully implemented yields insight into what approaches have and have not worked. We document five key lessons learned during the decade-long development and implementation of the Comprehensive Everglades Restoration Plan (CERP Collaborative Adaptive Management Program that might be useful to other adaptive management practitioners. First, legislative and regulatory authorities that require the development of an adaptive management program are necessary to maintain funding and support to set up and implement adaptive management. Second, integration of adaptive management activities into existing institutional processes, and development of technical guidance, helps to ensure that adaptive management activities are understood and roles and responsibilities are clearly articulated so that adaptive management activities are implemented successfully. Third, a strong applied science framework is critical for establishing a prerestoration ecosystem reference condition and understanding of how the system works, as well as for providing a conduit for incorporating new scientific information into the decision-making process. Fourth, clear identification of uncertainties that pose risks to meeting restoration goals helps with the development of hypothesis-driven strategies to inform restoration planning and implementation. Tools such as management options matrices can provide a coherent way to link hypotheses to specific monitoring efforts and options to adjust implementation if performance goals are not achieved. Fifth, independent external peer review of an adaptive management program provides important feedback critical to maintaining and improving adaptive management implementation for ecosystem restoration. These lessons

  3. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  4. Planning for and implementing an emerald ash borer-induced forest restoration program in municipal woodlands in Oakville, Ontario

    Science.gov (United States)

    Peter A. Williams; Candace. Karandiuk

    2017-01-01

    Oakville is an urban municipality with 846 ha of woodland. Management priorities are to maintain forest health, environmental health, and safety; wood production is a minor objective. The town developed a comprehensive strategy to plan for emerald ash borer (EAB; Agrilus planipennis) induced ash mortality and forest restoration. Oakville has begun...

  5. Gulf Coast Ecosystem Restoration Task Force---Gulf of Mexico Ecosystem Science Assessment and Needs

    Science.gov (United States)

    Walker, Shelby; Dausman, Alyssa M.; Lavoie, Dawn L.

    2012-01-01

    The Gulf Coast Ecosystem Restoration Task Force (GCERTF) was established by Executive Order 13554 as a result of recommendations from “America’s Gulf Coast: A Long-term Recovery Plan after the Deepwater Horizon Oil Spill” by Secretary of the Navy Ray Mabus (Mabus Report). The GCERTF consists of members from 11 Federal agencies and representatives from each State bordering the Gulf of Mexico. The GCERTF was charged to develop a holistic, long-term, science-based Regional Ecosystem Restoration Strategy for the Gulf of Mexico. Federal and State agencies staffed the GCERTF with experts in fields such as policy, budgeting, and science to help develop the Strategy. The Strategy was built on existing authorities and resources and represents enhanced collaboration and a recognition of the shared responsibility among Federal and State governments to restore the Gulf Coast ecosystem. In this time of severe fiscal constraints, Task Force member agencies and States are committed to establishing shared priorities and working together to achieve them.As part of this effort, three staffers, one National Oceanic and Atmospheric Administration (NOAA) scientist and two U.S. Geological Survey (USGS) scientists, created and led a Science Coordination Team (SCT) to guide scientific input into the development of the Gulf of Mexico Regional Ecosystem Restoration Strategy. The SCT leads from the GCERTF coordinated more than 70 scientists from the Federal and State Task Force member agencies to participate in development of a restoration-oriented science document focused on the entire Gulf of Mexico, from inland watersheds to the deep blue waters. The SCT leads and scientists were organized into six different working groups based on expanded goals from the Mabus Report: Coastal habitats are healthy and resilient.Living coastal and marine resources are healthy, diverse, and sustainable.Coastal communities are adaptive and resilient.Storm buffers are sustainable.Inland habitats and

  6. Restoration and repair of Earth's damaged ecosystems.

    Science.gov (United States)

    Jones, Holly P; Jones, Peter C; Barbier, Edward B; Blackburn, Ryan C; Rey Benayas, Jose M; Holl, Karen D; McCrackin, Michelle; Meli, Paula; Montoya, Daniel; Mateos, David Moreno

    2018-02-28

    Given that few ecosystems on the Earth have been unaffected by humans, restoring them holds great promise for stemming the biodiversity crisis and ensuring ecosystem services are provided to humanity. Nonetheless, few studies have documented the recovery of ecosystems globally or the rates at which ecosystems recover. Even fewer have addressed the added benefit of actively restoring ecosystems versus allowing them to recover without human intervention following the cessation of a disturbance. Our meta-analysis of 400 studies worldwide that document recovery from large-scale disturbances, such as oil spills, agriculture and logging, suggests that though ecosystems are progressing towards recovery following disturbances, they rarely recover completely. This result reinforces conservation of intact ecosystems as a key strategy for protecting biodiversity. Recovery rates slowed down with time since the disturbance ended, suggesting that the final stages of recovery are the most challenging to achieve. Active restoration did not result in faster or more complete recovery than simply ending the disturbances ecosystems face. Our results on the added benefit of restoration must be interpreted cautiously, because few studies directly compared different restoration actions in the same location after the same disturbance. The lack of consistent value added of active restoration following disturbance suggests that passive recovery should be considered as a first option; if recovery is slow, then active restoration actions should be better tailored to overcome specific obstacles to recovery and achieve restoration goals. We call for a more strategic investment of limited restoration resources into innovative collaborative efforts between scientists, local communities and practitioners to develop restoration techniques that are ecologically, economically and socially viable. © 2018 The Author(s).

  7. Use of hydrologic and hydrodynamic modeling for ecosystem restoration

    Science.gov (United States)

    Obeysekera, J.; Kuebler, L.; Ahmed, S.; Chang, M.-L.; Engel, V.; Langevin, C.; Swain, E.; Wan, Y.

    2011-01-01

    Planning and implementation of unprecedented projects for restoring the greater Everglades ecosystem are underway and the hydrologic and hydrodynamic modeling of restoration alternatives has become essential for success of restoration efforts. In view of the complex nature of the South Florida water resources system, regional-scale (system-wide) hydrologic models have been developed and used extensively for the development of the Comprehensive Everglades Restoration Plan. In addition, numerous subregional-scale hydrologic and hydrodynamic models have been developed and are being used for evaluating project-scale water management plans associated with urban, agricultural, and inland costal ecosystems. The authors provide a comprehensive summary of models of all scales, as well as the next generation models under development to meet the future needs of ecosystem restoration efforts in South Florida. The multiagency efforts to develop and apply models have allowed the agencies to understand the complex hydrologic interactions, quantify appropriate performance measures, and use new technologies in simulation algorithms, software development, and GIS/database techniques to meet the future modeling needs of the ecosystem restoration programs. Copyright ?? 2011 Taylor & Francis Group, LLC.

  8. Process to identify and evaluate restoration options

    International Nuclear Information System (INIS)

    Strand, J.; Senner, S.; Weiner, A.; Rabinowitch, S.; Brodersen, M.; Rice, K.; Klinge, K.; MacMullin, S.; Yender, R.; Thompson, R.

    1993-01-01

    The restoration planning process has yielded a number of possible alternatives for restoring resources and services injured by the Exxon Valdez oil spill. They were developed by resource managers, scientists, and the public, taking into consideration the results of damage assessment and restoration studies and information from the scientific literature. The alternatives thus far identified include no action natural recovery, management of human uses, manipulation of resources, habitat protection and acquisition, acquisition of equivalent resources, and combinations of the above. Each alternative consists of a different mix of resource- or service-specific restoration options. To decide whether it was appropriate to spend restoration funds on a particular resource or service, first criteria had to be developed that evaluated available evidence for consequential injury and the adequacy and rate of natural recovery. Then, recognizing the range of effective restoration options, a second set of criteria was applied to determine which restoration options were the most beneficial. These criteria included technical feasibility, potential to improve the rate or degree of recovery, the relationship of expected costs to benefits, cost effectiveness, and the potential to restore the ecosystem as a whole. The restoration options considered to be most beneficial will be grouped together in several or more of the above alternatives and presented in a draft restoration plan. They will be further evaluated in a companion draft environmental impact statement

  9. Crown and crown-root fractures: an evaluation of the treatment plans for management proposed by 154 specialists in restorative dentistry.

    Science.gov (United States)

    de Castro, Mara Antonio Monteiro; Poi, Wilson Roberto; de Castro, José Carlos Monteiro; Panzarini, Sônia Regina; Sonoda, Celso Koogi; Trevisan, Carolina Lunardelli; Luvizuto, Eloá Rodrigues

    2010-06-01

    Traumatic tooth injuries involve function and aesthetics and cause damage that range from minimal enamel loss to complex fractures involving the pulp tissue and even loss of the tooth crown. Technical knowledge and clinical experience are essential to establish an accurate diagnosis and provide a rational treatment. The purpose of this study was to evaluate the knowledge of Restorative Dentistry specialists about the management of crown and crown-root fractures based on treatment plans proposed by these professionals for these cases. A descriptive questionnaire was mailed to 245 Restorative Dentistry specialists with questions referring to their professional profile and the treatment plans they would propose for the management of crown and crow-root fractures resulting from dental trauma. One hundred and fifty-four questionnaires were returned properly filled. The data were subjected to descriptive statistics and the chi-square test was used to determine the frequency and the level of the significance among the variables. The analysis of data showed that in spite of having a specialist title, all interviewees had great difficulty in planning the treatments. As much as 42.8% of the participants were unable to treat all types of dental trauma. Complicated and uncomplicated crown-root fractures posed the greatest difficulties for the dentists to establish adequate treatment plans because these fractures require multidisciplinary knowledge and approach for a correct case planning and prognosis.

  10. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes

  11. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes

  12. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes

  13. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  14. Governing Forest Landscape Restoration: Cases from Indonesia

    Directory of Open Access Journals (Sweden)

    Cora van Oosten

    2014-05-01

    Full Text Available Forest landscape restoration includes both the planning and implementation of measures to restore degraded forests within the perspective of the wider landscape. Governing forest landscape restoration requires fundamental considerations about the conceptualisation of forested landscapes and the types of restoration measures to be taken, and about who should be engaged in the governance process. A variety of governance approaches to forest landscape restoration exist, differing in both the nature of the object to be governed and the mode of governance. This paper analyses the nature and governance of restoration in three cases of forest landscape restoration in Indonesia. In each of these cases, both the original aim for restoration and the initiators of the process differ. The cases also differ in how deeply embedded they are in formal spatial planning mechanisms at the various political scales. Nonetheless, the cases show similar trends. All cases show a dynamic process of mobilising the landscape’s stakeholders, plus a flexible process of crafting institutional space for conflict management, negotiation and decision making at the landscape level. As a result, the landscape focus changed over time from reserved forests to forested mosaic lands. The cases illustrate that the governance of forest landscape restoration should not be based on strict design criteria, but rather on a flexible governance approach that stimulates the creation of novel public-private institutional arrangements at the landscape level.

  15. Waste Isolation Pilot Plant Strategic Plan

    International Nuclear Information System (INIS)

    1993-03-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Strategic Plan is to provide decision makers, project participants, and the public with a high-level overview of the objectives, issues, and strategiesthat impact a decision on the suitability of WIPP as a permanent, safe disposal facility for transuranic (TRU) waste that has resulted from defense activities. This document is a component of an integrated planning process and is a key management tool that is coordinated and consistent with the Secretary's Disposal Decision Plan and the Environmental Restoration and Waste Management (EM) Five-Year Plan. This documentsupports other US Department of Energy (DOE) planning efforts, including the TRU Waste Program. The WIPP Strategic Plan addresses the WIPP Program Test Phase, Disposal Decision, Disposal Phase, and Decommissioning Phase (decontamination and decommissioning). It describes the actions and activities that the DOE will conduct to ensure that WIPP will comply with applicable, relevant, and appropriate requirements of the US Environmental Protection Agency (EPA), State of New Mexico, and other applicable federal and state regulations. It also includes the key assumptions under which the strategy was developed. A comprehensive discussion of the multitude of activities involved in the WIPP Program cannot be adequately presented in this document. The specific details of these activities are presented in other, more detailed WIPP planningdocuments

  16. Proceedings of the Columbia River Estuary Conference on Ecosystem Restoration, April 29-30, 2008, Astoria, Oregon.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E. [Pacific Northwest National Laboratory; Sutherland, G. Bruce [Oregon Department of Environmental Quality (retired)

    2008-09-29

    The 2008 Columbia River Estuary Conference was held at the Liberty Theater in Astoria, Oregon, on April 19-20. The conference theme was ecosystem restoration. The purpose of the conference was to exchange data and information among researchers, policy-makers, and the public, i.e., interrelate science with management. Conference organizers invited presentations synthesizing material on Restoration Planning and Implementation (Session 1), Research to Reduce Restoration Uncertainties (Session 2), Wetlands and Flood Management (Session 3), Action Effectiveness Monitoring (Session 4), and Management Perspectives (Session 5). A series of three plenary talks opened the conference. Facilitated speaker and audience discussion periods were held at the end of each session. Contributed posters conveyed additional data and information. These proceedings include abstracts and notes documenting questions from the audience and clarifying answers from the presenter for each talk. The proceedings also document key points from the discussion periods at the end of each session. The conference program is outlined in the agenda section. Speaker biographies are presented in Appendix A. Poster titles and authors are listed in Appendix B. A list of conference attendees is contained in Appendix C. A compact disk, attached to the back cover, contains material in hypertext-markup-language from the conference website (http://cerc.labworks.org/) and the individual presentations.

  17. Clean Slate 1 revegetation and monitoring plan

    International Nuclear Information System (INIS)

    Anderson, D.C.; Hall, D.B.

    1997-07-01

    This document constitutes a reclamation plan for the short-term and long-term stabilization of land disturbed by activities associated with the cleanup of radionuclide contaminated surface soil at the Clean Slate 1 site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. The results of reclamation trials at Area 11, Area 19 and more recently the reclamation demonstration plots at the Double Tracks cleanup site, have been summarized and incorporated into this reclamation and monitoring plan. The plan also contains procedures for monitoring both the effectiveness and success of short-term and long-term soil stabilization. The Clean Slate 1 site is located on the Tonopah Test Range. The surface soils were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation

  18. An appraisal of adaptive management planning and implementation in ecological restoration

    DEFF Research Database (Denmark)

    Nagarkar, Mita; Raulund-Rasmussen, Karsten

    2016-01-01

    Adaptive management has been defined and redefined in the context of natural resource management, yet there are few examples of its successful application in ecological restoration. Although the 2009 Delta Reform Act now legally requires adaptive management for all restoration efforts in the Sacr......Adaptive management has been defined and redefined in the context of natural resource management, yet there are few examples of its successful application in ecological restoration. Although the 2009 Delta Reform Act now legally requires adaptive management for all restoration efforts...

  19. A Decentralized Multi-Agent-Based Approach for Low Voltage Microgrid Restoration

    Directory of Open Access Journals (Sweden)

    Ebrahim Rokrok

    2017-09-01

    Full Text Available Although a well-organized power system is less subject to blackouts, the existence of a proper restoration plan is nevertheless still essential. The goal of a restoration plan is to bring the power system back to its normal operating conditions in the shortest time after a blackout occurs and to minimize the impact of the blackout on society. This paper presents a decentralized multi-agent system (MAS-based restoration method for a low voltage (LV microgrid (MG. In the proposed method, the MG local controllers are assigned to the specific agents who interact with each other to achieve a common decision in the restoration procedure. The evaluation of the proposed decentralized technique using a benchmark low-voltage MG network demonstrates the effectiveness of the proposed restoration plan.

  20. Lost lake - restoration of a Carolina bay

    Energy Technology Data Exchange (ETDEWEB)

    Hanlin, H.G.; McLendon, J.P. [Univ. of South Carolina, Aiken, SC (United States). Dept. of Biology and Geology; Wike, L.D. [Univ. of South Carolina, Aiken, SC (United States). Dept. of Biology and Geology]|[Westinghouse Savannah River Co., Aiken, SC (United States). Savannah River Technology Center; Dietsch, B.M. [Univ. of South Carolina, Aiken, SC (United States). Dept. of Biology and Geology]|[Univ. of Georgia, Aiken, SC (United States)

    1994-09-01

    Carolina bays are shallow wetland depressions found only on the Atlantic Coastal Plain. Although these isolated interstream wetlands support many types of communities, they share the common features of having a sandy margin, a fluctuating water level, an elliptical shape, and a northwest to southeast orientation. Lost Lake, an 11.3 hectare Carolina bay, was ditched and drained for agricultural production before establishment of the Savannah River Site in 1950. Later it received overflow from a seepage basin containing a variety of chemicals, primarily solvents and some heavy metals. In 1990 a plan was developed for the restoration of Lost Lake, and restoration activities were complete by mid-1991. Lost Lake is the first known project designed for the restoration and recovery of a Carolina bay. The bay was divided into eight soil treatment zones, allowing four treatments in duplicate. Each of the eight zones was planted with eight species of native wetland plants. Recolonization of the bay by amphibians and reptiles is being evaluated by using drift fences with pitfall traps and coverboard arrays in each of the treatment zones. Additional drift fences in five upland habitats were also established. Hoop turtle traps, funnel minnow traps, and dip nets were utilized for aquatic sampling. The presence of 43 species common to the region has been documented at Lost Lake. More than one-third of these species show evidence of breeding populations being established. Three species found prior to the restoration activity and a number of species common to undisturbed Carolina bays were not encountered. Colonization by additional species is anticipated as the wetland undergoes further succession.

  1. Environmental restoration plans and activities in France: 1995-1996 progress report

    International Nuclear Information System (INIS)

    Roussel, V.

    1997-01-01

    In 50 years, more than 200 mining sites and 11 processing plants have contributed to French uranium production. At present only two mines are still in production. The others have already been restored or are in the final phase of restoration. This report gives a retrospective account of developments and statutory actions currently in progress, with examples of sites at various stages of restoration. The importance of research and development studies as well as efforts being put in to communicate with all the parties concerned in these restoration projects are specially emphasized. (author)

  2. Intelligent decision support algorithm for distribution system restoration.

    Science.gov (United States)

    Singh, Reetu; Mehfuz, Shabana; Kumar, Parmod

    2016-01-01

    Distribution system is the means of revenue for electric utility. It needs to be restored at the earliest if any feeder or complete system is tripped out due to fault or any other cause. Further, uncertainty of the loads, result in variations in the distribution network's parameters. Thus, an intelligent algorithm incorporating hybrid fuzzy-grey relation, which can take into account the uncertainties and compare the sequences is discussed to analyse and restore the distribution system. The simulation studies are carried out to show the utility of the method by ranking the restoration plans for a typical distribution system. This algorithm also meets the smart grid requirements in terms of an automated restoration plan for the partial/full blackout of network.

  3. Restoration of Lost Lake, recovery of an impacted Carolina Bay

    International Nuclear Information System (INIS)

    Wike, L.D.; Gladden, J.B.; Mackey, H.E. Jr.; Rogers, V.A.

    1995-01-01

    Lost Lake is one of approximately 200 Carolina bays found on the Savannah River Site (SRS). Until 1984 Lost Lake was contaminated by heavy metals and solvents overflowing from a nearby settling basin. Up to 12 inches of surface soil and all vegetation was removed from the bay as part of a RCRA removal action. A plan for restoration was initiated in 1989 and implemented in 1990 and 1991. Extensive planning led to defined objectives, strategies, treatments, and monitoring programs allowing successful restoration of Lost Lake. The primary goal of the project was to restore the wetland ecosystem after a hazardous waste clean up operation. An additional goal was to study the progress of the project and the success of the restoration activity. Several strategy considerations were necessary in the restoration plan. The removal of existing organic soils had to have compensation, a treatment scheme for planting and the extent of manipulation of the substrate had to be considered, monitoring decisions had to be made, and the decision whether or not to actively control the hydrology of the restored system

  4. Public comments and responses to the 1993 Hanford cleanup five-year plan

    International Nuclear Information System (INIS)

    1993-08-01

    In March 1993, the US Department of Energy, Richland Operations Office (DOE-RL) published its annual Site-Specific Five-Year Plan. The Site-Specific Plan is published to inform the public about the background, status, and plans for Environmental Restoration (ER) and Waste Management (WM) activities at the Hanford site. It is the only document that seeks to bring all ER and WM elements together in one document. The Site-Specific Plan is a companion document to the National Five-Year Plan that deals with all the sites within the DOE complex on a summary level. This Response to Comments document does not try to address every question or concern raised during the public comment period. Some questions were outside the scope of the Five-Year Plan, some we could not decipher, others were variations of the same question. The initial round of public meetings was held in Portland, Oregon, and Seattle, Pasco, and Olympia, Washington. At the request of the Oregon Department of Energy (ODOE) and the Washington State Department of Ecology (Ecology), a second round of meetings was held in Portland and Olympia. Both agencies felt that the first two meetings were held with too little advance notice, and before the Plan could be distributed. Once the public meetings were over and the comment period closed, we then compiled the public comments, largely from audio tapes of the meetings. Individual functions within Hanford were asked to consider and respond to the comments

  5. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  6. Restoration of contaminated ecosystems: adaptive management in a changing climate

    Science.gov (United States)

    Farag, Aida; Larson, Diane L.; Stauber, Jenny; Stahl, Ralph; Isanhart, John; McAbee, Kevin T.; Walsh, Christopher J.

    2017-01-01

    Three case studies illustrate how adaptive management (AM) has been used in ecological restorations that involve contaminants. Contaminants addressed include mercury, selenium, and contaminants and physical disturbances delivered to streams by urban stormwater runoff. All three cases emphasize the importance of broad stakeholder input early and consistently throughout decision analysis for AM. Risk of contaminant exposure provided input to the decision analyses (e.g. selenium exposure to endangered razorback suckers, Stewart Lake; multiple contaminants in urban stormwater runoff, Melbourne) and was balanced with the protection of resources critical for a desired future state (e.g. preservation old growth trees, South River). Monitoring also played a critical role in the ability to conduct the decision analyses necessary for AM plans. For example, newer technologies in the Melbourne case provided a testable situation where contaminant concentrations and flow disturbance were reduced to support a return to good ecological condition. In at least one case (Stewart Lake), long-term monitoring data are being used to document the potential effects of climate change on a restoration trajectory. Decision analysis formalized the process by which stakeholders arrived at the priorities for the sites, which together constituted the desired future condition towards which each restoration is aimed. Alternative models were developed that described in mechanistic terms how restoration can influence the system towards the desired future condition. Including known and anticipated effects of future climate scenarios in these models will make them robust to the long-term exposure and effects of contaminants in restored ecosystems.

  7. Proposed Plan for an amendment to the Environmental Restoration Disposal Facility Record of Decision, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    The U.S. Environmental Protection Agency, the Washington State Department of Ecology, and the U.S. Department of Energy (Tri- Parties) are proposing an amendment to the Environmental Restoration Disposal Facility Record of Decision (ERDF ROD). EPA is the lead regulatory agency for the ERDF Project. This Proposed Plan includes two elements intended to promote Hanford Site cleanup activities by broadening utilization and operation of ERDF as follows: (1) Construct the planned Phase II of ERDF using the current disposal cell design and (2) enable centralized treatment of remediation waste at ERDF prior to disposal, as appropriate

  8. Comparisons of ANS, ASME, AWS, and NFPA standards cited in the NRC standard review plan, NUREG-0800, and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Spiesman, J.B.

    1995-11-01

    This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  9. Current Concepts in Restorative Implant Dentistry

    Institute of Scientific and Technical Information of China (English)

    Prof.Marchack

    2009-01-01

    Patients today are incteasingly aware of dental implants.and their expectations are for esthetically and functionally pleasingimplant restorations that mimic natural teeth.This presentation will give both the experienced and novice practitioner a better understand-ing of how restorative implant dentistry has evolved.Treatment planning and restorative options for single implants.multiple implants andfully edentulons arches will be discussed,and the use of modern materials and CADCAM technology in fabricating the most contemporaryfixed implant supported prostheses will be demonstrated.

  10. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 408: Bomblet Target Area, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2006-01-01

    This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 408, Bomblet Target Area. CAU 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. One Corrective Action Site (CAS) is included in CAU 408: (lg b ullet) CAS TA-55-002-TAB2, Bomblet Target Areas Based on historical documentation, personnel interviews, process knowledge, site visits, aerial photography, multispectral data, preliminary geophysical surveys, and the results of data quality objectives process (Section 3.0), clean closure will be implemented for CAU 408. CAU 408 closure activities will consist of identification and clearance of bomblet target areas, identification and removal of depleted uranium (DU) fragments on South Antelope Lake, and collection of verification samples. Any soil containing contaminants at concentrations above the action levels will be excavated and transported to an appropriate disposal facility. Based on existing information, contaminants of potential concern at CAU 408 include explosives. In addition, at South Antelope Lake, bomblets containing DU were tested. None of these contaminants is expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results. The corrective action investigation and closure activities have been planned to include data collection and hold points throughout the process. Hold points are designed to allow decision makers to review the existing data and decide which of the available options are most suitable. Hold points include the review of radiological, geophysical, and analytical data and field observations

  11. 78 FR 72932 - Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment No. 31 to the...

    Science.gov (United States)

    2013-12-04

    .... B. Governing or Constituent Documents Not applicable. C. Implementation of Amendment Rule 608(b)(3... Reduction The existing constraints on fees for core market data under the Plans have generally succeeded in... OMDF servers to restore network switch diversity for primary and backup services Implemented Limit Up...

  12. Passive restoration augments active restoration in deforested landscapes: the role of root suckering adjacent to planted stands of Acacia koa

    Science.gov (United States)

    Paul G. Scowcroft; Justin T. Yeh

    2013-01-01

    Active forest restoration in Hawaii’s Hakalau Forest National Wildlife Refuge has produced a network of Acacia koa tree corridors and islands in deforested grasslands. Passive restoration by root suckering has potential to expand tree cover and close gaps between planted stands. This study documents rates of encroachment into grassland, clonal...

  13. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  14. Planning Document for an NBSR Conversion Safety Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Diamond D. J.; Baek J.; Hanson, A.L.; Cheng, L-Y.; Brown, N.; Cuadra, A.

    2013-09-25

    The NIST Center for Neutron Research (NCNR) is a reactor-laboratory complex providing the National Institute of Standards and Technology (NIST) and the nation with a world-class facility for the performance of neutron-based research. The heart of this facility is the National Bureau of Standards Reactor (NBSR). The NBSR is a heavy water moderated and cooled reactor operating at 20 MW. It is fueled with high-enriched uranium (HEU) fuel elements. A Global Threat Reduction Initiative (GTRI) program is underway to convert the reactor to low-enriched uranium (LEU) fuel. This program includes the qualification of the proposed fuel, uranium and molybdenum alloy foil clad in an aluminum alloy, and the development of the fabrication techniques. This report is a planning document for the conversion Safety Analysis Report (SAR) that would be submitted to, and approved by, the Nuclear Regulatory Commission (NRC) before the reactor could be converted.This report follows the recommended format and content from the NRC codified in NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-power Reactors,” Chapter 18, “Highly Enriched to Low-Enriched Uranium Conversions.” The emphasis herein is on the SAR chapters that require significant changes as a result of conversion, primarily Chapter 4, Reactor Description, and Chapter 13, Safety Analysis. The document provides information on the proposed design for the LEU fuel elements and identifies what information is still missing. This document is intended to assist ongoing fuel development efforts, and to provide a platform for the development of the final conversion SAR. This report contributes directly to the reactor conversion pillar of the GTRI program, but also acts as a boundary condition for the fuel development and fuel fabrication pillars.

  15. Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1992-07-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D ampersand D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S ampersand M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D ampersand D contractors are required to prepare formal plans that document the S ampersand M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D ampersand D Program

  16. Using the INEL site-specific plan as a community relations tool

    International Nuclear Information System (INIS)

    Hart, Michael; Macdonald, Don; Couch, Brad; Reuel Smith, M.

    1992-01-01

    Idaho National Engineering Laboratory (INEL) activities have affected, or have the potential to affect the environment. For this reason) the issues surrounding INEL activities are of interest to a broad range of people. The preparation of the INEL Site-Specific Plan (SSP) reflects the U.S. Department of Energy Idaho Field Office's (DOE-ID'S) initiative for open and clear communications with the public. The INEL SSP describes for the public DOE-ID'S plan to clean up inactive facilities and locations that were contaminated due to past waste management practices. It also discusses waste management strategies for avoiding future contamination by active operations. The SSP is an over-arching document and supplies 'the big picture' of environmental restoration and waste management activities to the public, including budget information and long-range plans. DOE-ID has been using the INEL Site-Specific Plan and its associated public comment period as a primary tool for public involvement and as way to get meaningful citizen input into DOE-ID planning. Public involvement in the INBL Site-Specific Plan has four main objectives: To inform public officials, Indian Tribes, interest groups, businesses, and individuals about current plans for environmental restoration and waste management activities at INEL; To ensure that public concerns and interests relating to environmental restoration and waste management are reflected in the SSP and DOE-ID planning; To provide flexibility so modifications can be made to DOE-ID plans and the SSP in response to changing concerns within the community, and; To ensure that DOE-ID and INEL contractors are given feedback regarding public interest in, and concerns about, the DOE-ID'S plans. To carry out these objectives, DOE-ID has implemented an aggressive public outreach effort that provides multiple opportunities for public participation in cleanup and waste management decisions. (author)

  17. Restoration of an intruded maxillary central incisor with a uniquely designed dowel and core restoration: a case report.

    Science.gov (United States)

    Polat, Zelal Seyfioğlu; Tacir, Ibrahim Halil

    2007-01-01

    This article describes the restoration of an intruded root using a custom-made metal dowel and metal-ceramic veneer core restoration. The treatment plan for this patient consisted of restoring the missing esthetics and eliminating psychological trauma by utilizing the root of the intruded maxillary left central incisor to replace both missing central incisor crowns. This treatment will preserve space and bone until the patient is old enough for another prosthodontic restoration to be considered. As the lost fragments were not recovered, we considered this restoration of the intruded root to be the best therapeutic option, considering the effect on the patient's psyche. The patient was satisfied with the final result.

  18. Process benchmarking for improvement of environmental restoration activities

    International Nuclear Information System (INIS)

    Celorie, J.A.; Selman, J.R.; Larson, N.B.

    1995-01-01

    A process benchmarking study was initiated by the Office of Environmental Management (EM) of the US Department of Energy (DOE) to analyze and improve the department's environmental assessment and environmental restoration (ER) processes. The purpose of this study was to identify specific differences in the processes and implementation procedures used at comparable remediation sites to determine best practices which had the greatest potential to minimize the cost and time required to conduct remedial investigation/ feasibility study (RI/FS) activities. Technical criteria were identified and used to select four DOE, two Department of Defense (DOD), and two Environmental Protection Agency (EPA) restoration sites that exhibited comparable characteristics and regulatory environments. By comparing the process elements and activities executed at the different sites for similar endpoints, best practices were identified for streamlining process elements and minimizing non-value-added activities. Critical measures that influenced process performance were identified and characterized for the sites. This benchmarking study focused on two processes and the internal/external review of documents and the development of the initial evaluation and data collection plan (IEDCP)--since these had a great potential for savings, a high impact on other processes, and a high probability for implementation

  19. Social learning in a policy-mandated collaboration: Community wildfire protection planning in the eastern United States

    Science.gov (United States)

    Rachel F. Brummel; Kristen C. Nelson; Pamela J. Jakes; Daniel R. Williams

    2010-01-01

    Policies such as the US Healthy Forests Restoration Act (HFRA) mandate collaboration in planning to create benefits such as social learning and shared understanding among partners. However, some question the ability of top-down policy to foster successful local collaboration. Through in-depth interviews and document analysis, this paper investigates social learning and...

  20. BURT: back up and restore tool

    Energy Technology Data Exchange (ETDEWEB)

    Karonis, N.T.

    1994-11-01

    BURT is just one of the tools in the Experimental Physics Industrial Control System (EPICS). In this document we address the problem of backing up and restoring sets of values in databases whose values are continuously changing. In doing so, we present the Back Up and Restore Tool (BURT). In this presentation we provide a theoretical framework that defines the problem and lays the foundation for its solution. BURT is a tool designed and implemented with respect to that theoretical framework. It is not necessary for users of BURT to have an understanding of that framework. It was included in this document only for the purpose of completeness. BURT`s basic purpose is to back up sets of values so that they can be later restored. Each time a back up is requested, a new ASCII file is generated. Further, the data values are stored as ASCII strings and therefore not compressed. Both of these facts conspire against BURT as a candidate for an archiver. Users who need an archiver should use a different tool, the Archiver.

  1. 75 FR 4006 - Emergency Restoration Plan (ERP)

    Science.gov (United States)

    2010-01-26

    ... Agency (FEMA) for public assistance grant eligibility in the event of a declared disaster. This amendment... they incur costs for disaster related system repair and restoration by including FEMA requirements in... comments, and viewing the docket after the close of the comment period, is available through the site's...

  2. Post-Fire Restoration Plan for Sustainable Forest Management in South Korea

    Directory of Open Access Journals (Sweden)

    Soung-Ryoul Ryu

    2017-05-01

    Full Text Available This review was to determine a standard post-fire restoration strategy for use in South Korea according to the magnitude of the damage and the condition of the affected site. The government has strongly enforced reforestation in deforested areas as well as fire prevention and suppression since the 1960s. These efforts have successfully recovered dense even-aged forests over the last five decades. However, high fuel loading and the homogeneous structure have made forests vulnerable to large fires. In recent years, large forest fires have occurred in the eastern coastal region of Korea. Forest fires can significantly influence the economic and social activities of the residents of such affected forest regions. Burned areas may require urgent and long-term restoration strategies, depending on the condition of the affected site. Erosion control is the most important component of an urgent restoration and should be completed before a rainy season to prevent secondary damage such as landslides and sediment runoff in burned areas. Long-term restoration is necessary to renew forest functions such as timber production, water conservation, ecosystem conservation, and recreation for residents. Sound restoration for burned areas is critical for restoring healthy ecological functions of forests and providing economic incentives to local residents.

  3. Applications for electronic documents

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1995-01-01

    This paper discusses the application of electronic media to documents, specifically Safety Analysis Reports (SARs), prepared for Environmental Restoration and Waste Management (ER ampersand WM) programs being conducted for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). Efforts are underway to upgrade our document system using electronic format. To satisfy external requirements (DOE, State, and Federal), ER ampersand WM programs generate a complement of internal requirements documents including a SAR and Technical Safety Requirements along with procedures and training materials. Of interest, is the volume of information and the difficulty in handling it. A recently prepared ER ampersand WM SAR consists of 1,000 pages of text and graphics; supporting references add 10,000 pages. Other programmatic requirements documents consist of an estimated 5,000 pages plus references

  4. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part A

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  5. Technology needs assessment for DOE environmental restoration programs

    International Nuclear Information System (INIS)

    Duray, J.R.; Carlson, T.J.; Carpenter, C.E.; Cummins, L.E.; Daub, G.J.

    1992-01-01

    The 'Technology Needs Assessment Final Report' describes current and planned environmental restoration activity, identifies technologies intended to be used or under consideration, and ranks technology deficiencies in the U.S. Department of Energy's environmental restoration program. Included in the ranking are treatment technologies, characterization technologies, and non-technology issues that affect environmental restoration. Data used for the assessment was gathered during interviews in the spring of 1991 with DOE site personnel responsible for the environmental restoration work. (author)

  6. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A - Quality assurance plan; Appendix B - Records management plan

    International Nuclear Information System (INIS)

    1997-03-01

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, which is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included

  7. Environmental Restoration Progam Waste Minimization and Pollution Prevention Awareness Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Grumski, J. T.; Swindle, D. W.; Bates, L. D.; DeLozier, M. F.P.; Frye, C. E.; Mitchell, M. E.

    1991-09-30

    In response to DOE Order 5400.1 this plan outlines the requirements for a Waste Minimization and Pollution Prevention Awareness Program for the Environmental Restoration (ER) Program at Martin Marietta Energy System, Inc. Statements of the national, Department of Energy, Energy Systems, and Energy Systems ER Program policies on waste minimization are included and reflect the attitudes of these organizations and their commitment to the waste minimization effort. Organizational responsibilities for the waste minimization effort are clearly defined and discussed, and the program objectives and goals are set forth. Waste assessment is addressed as being a key element in developing the waste generation baseline. There are discussions on the scope of ER-specific waste minimization techniques and approaches to employee awareness and training. There is also a discussion on the process for continual evaluation of the Waste Minimization Program. Appendixes present an implementation schedule for the Waste Minimization and Pollution Prevention Program, the program budget, an organization chart, and the ER waste minimization policy.

  8. Environmental Restoration Progam Waste Minimization and Pollution Prevention Awareness Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    In response to DOE Order 5400.1 this plan outlines the requirements for a Waste Minimization and Pollution Prevention Awareness Program for the Environmental Restoration (ER) Program at Martin Marietta Energy System, Inc. Statements of the national, Department of Energy, Energy Systems, and Energy Systems ER Program policies on waste minimization are included and reflect the attitudes of these organizations and their commitment to the waste minimization effort. Organizational responsibilities for the waste minimization effort are clearly defined and discussed, and the program objectives and goals are set forth. Waste assessment is addressed as being a key element in developing the waste generation baseline. There are discussions on the scope of ER-specific waste minimization techniques and approaches to employee awareness and training. There is also a discussion on the process for continual evaluation of the Waste Minimization Program. Appendixes present an implementation schedule for the Waste Minimization and Pollution Prevention Program, the program budget, an organization chart, and the ER waste minimization policy

  9. Environmental guidance for public participation in environmental restoration activities

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    The US Department of Energy (DOE) is issuing this document, entitled Guidance on Public Participation for US Department of Energy Environmental Restoration Activities, to summarize policy and provide guidance for public participation in environmental restoration activities at DOE Headquarters, Field Offices, facilities, and laboratories. While the Office of Environmental Restoration and Waste Management (EM) has environmental restoration responsibility for the majority of DOE sites and facilities, other DOE Project Offices have similar responsibilities at their sites and facilities. This guidance is applicable to all environment restoration activities conducted by or for DOE under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA); the Resource Conservation and Recovery Act of 1976 (RCRA) as amended by the Hazardous and Solid Waste Amendments of 1984 (HSWA) (corrective actions only); and the National Environmental Policy Act of 1969 (NEPA). This guidance also is applicable to CERCLA remedial action programs under the Uranium Mill Tailings Radiation Control Act of 1978 and the Formerly Utilized Sites Remedial Action Program, where DOE is the designated lead. The primary objectives of this guidance document are as follows: acclimate DOE staff to a changing culture that emphasizes the importance of public participation activities; provide direction on implementing these public participation activities; and, provide consistent guidance for all DOE Field Offices and facilities. The purpose of this document is to provide guidance on conducting effective public participation activities for environmental restoration activities under CERCLA; RCRA corrective actions under sections 3004(u), 3004(v), and 3008(h); and NEPA public participation activities.

  10. 12 CFR 325.104 - Capital restoration plans.

    Science.gov (United States)

    2010-01-01

    ... liability of the company under any guarantee required or provided in connection with any capital restoration... of the full amount of that guarantee from any or all of the companies issuing the guarantee. (2... shall be accepted unless it includes any performance guarantee described in section 38(e)(2)(C) of the...

  11. 12 CFR 6.5 - Capital restoration plans.

    Science.gov (United States)

    2010-01-01

    ... liability of the company under any guarantee required or provided in connection with any capital restoration... amount of that guarantee from any or all of the companies issuing the guarantee. (2) Failure to provide... it includes any performance guarantee described in section 38(e)(2)(C) of that Act by each company...

  12. Lab of conservation and restoration of paper collections of CNEA: gamma radiation treatment of books and documents affected by microorganisms

    International Nuclear Information System (INIS)

    Alfaro, Laura; Miranda, Maria V.; Gonzalez, Maria E.; Calvo, Ana M.

    2009-01-01

    In 2005 the CNEA's Laboratory of Conservation and Restoration of Paper Collections was inaugurated at the Ezeiza Atomic Centre. This lab takes advantage of the experience of CNEA in the utilization of the biocide effects of gamma radiation for decontamination and sterilization of different products, mainly medical products. In recent years the application of gamma radiation to the other goods was explored. Gamma radiation can be utilized for disinfection in the case of biological contamination, such as contamination of books and documents by fungi or insects, and in the case of some disasters (inundation or fire controlled with water in libraries and archives) to prevent the growing of fungi and pathogenic bacteria. (author) [es

  13. STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITY NEVADA TEST SITE, NEVADA

    International Nuclear Information System (INIS)

    2006-01-01

    This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada

  14. Public Comment Period Open for the Draft Update to the Planning for Natural Disaster Debris Guidance and to Related Documents

    Science.gov (United States)

    EPA is requesting comment on the draft Planning for Natural Disaster Debris Guidance, and two other documents. The Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.

  15. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-20

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D&D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities.

  16. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D ampersand D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities

  17. Molten Salt Reactor Experiment Facility (Building 7503) standards/requirements identification document adherence assessment plan at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    This is the Phase 2 (adherence) assessment plan for the Building 7503 Molten Salt Reactor Experiment (MSRE) Facility standards/requirements identification document (S/RID). This document outlines the activities to be conducted from FY 1996 through FY 1998 to ensure that the standards and requirements identified in the MSRE S/RID are being implemented properly. This plan is required in accordance with the Department of Energy Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 90-2, November 9, 1994, Attachment 1A. This plan addresses the major aspects of the adherence assessment and will be consistent with Energy Systems procedure QA-2. 7 ''Surveillances.''

  18. Documentation of a groundwater flow model (SJRRPGW) for the San Joaquin River Restoration Program study area, California

    Science.gov (United States)

    Traum, Jonathan A.; Phillips, Steven P.; Bennett, George L.; Zamora, Celia; Metzger, Loren F.

    2014-01-01

    the natural heterogeneity of aquifer-system materials within the model domain. In addition, the stream properties were updated from the CVHM to better simulate stream-aquifer interactions, and water-budget subregions were refined to better simulate agricultural water supply and demand. External boundary conditions were derived from the CVHM. The SJRRPGW was calibrated for April 1961 to September 2003 by using groundwater-level observations from 133 wells and streamflow observations from 19 streamgages. The model was calibrated using public-domain parameter estimation software (PEST) in a semi-automated manner. The simulated groundwater-level elevations and trends (including seasonal fluctuations) and surface-water flow magnitudes and trends reasonably matched observed data. The calibrated model is planned to be used to assess the potential effects of restoration flows on agricultural lands and the relative capabilities of proposed SJRRP actions to reduce these effects.

  19. Spatial and stage-structured population model of the American crocodile for comparison of comprehensive Everglades Restoration Plan (CERP) alternatives

    Science.gov (United States)

    Green, Timothy W.; Slone, Daniel H.; Swain, Eric D.; Cherkiss, Michael S.; Lohmann, Melinda; Mazzotti, Frank J.; Rice, Kenneth G.

    2010-01-01

    As part of the U.S. Geological Survey Priority Ecosystems Science (PES) initiative to provide the ecological science required during Everglades restoration, we have integrated current regional hydrologic models with American crocodile (Crocodylus acutus) research and monitoring data to create a model that assesses the potential impact of Comprehensive Everglades Restoration Plan (CERP) efforts on the American crocodile. A list of indicators was created by the Restoration Coordination and Verification (RECOVER) component of CERP to help determine the success of interim restoration goals. The American crocodile was established as an indicator of the ecological condition of mangrove estuaries due to its reliance upon estuarine environments characterized by low salinity and adequate freshwater inflow. To gain a better understanding of the potential impact of CERP restoration efforts on the American crocodile, a spatially explicit crocodile population model has been created that has the ability to simulate the response of crocodiles to various management strategies for the South Florida ecosystem. The crocodile model uses output from the Tides and Inflows in the Mangroves of the Everglades (TIME) model, an application of the Flow and Transport in a Linked Overland/Aquifer Density Dependent System (FTLOADDS) simulator. TIME has the capability to link to the South Florida Water Management Model (SFWMM), which is the primary regional tool used to assess CERP restoration scenarios. A crocodile habitat suitability index and spatial parameter maps that reflect salinity, water depth, habitat, and nesting locations are used as driving functions to construct crocodile finite rate of increase maps under different management scenarios. Local stage-structured models are integrated with a spatial landscape grid to display crocodile movement behavior in response to changing environmental conditions. Restoration efforts are expected to affect salinity levels throughout the habitat of

  20. Standardization Documents

    Science.gov (United States)

    2011-08-01

    Specifications and Standards; Guide Specifications; CIDs; and NGSs . Learn. Perform. Succeed. STANDARDIZATION DOCUMENTS Federal Specifications Commercial...national or international standardization document developed by a private sector association, organization, or technical society that plans ...Maintain lessons learned • Examples: Guidance for application of a technology; Lists of options Learn. Perform. Succeed. DEFENSE HANDBOOK

  1. The Importance of Documenting and Including Traditional Wisdom in Community-Based Ecotourism Planning

    Directory of Open Access Journals (Sweden)

    Vesna Đukić

    2017-01-01

    Full Text Available This article accords to the theory of community-based tourism, which represents a concept that respects natural and cultural resources of a particular community and encourages participation of its members in the process of tourist product creation. The article operates in the planning phase and aims to give insights into the process of establishing the groundwork for community-based tourism. The key element is documenting and illustrating everything that could be a part of what is known as “traditional wisdom,” namely, the skills and knowledge of traditional life practices. The methods of case study, content analysis, and observation of the village of Omoljica, Serbia, were used. The positive aspect of this locality is reflected in the existing short-term initiatives of organizations and individuals engaging in preserving traditional practices, but without systematic, long-term planning and management of community-based tourism, these individual efforts to revalue traditional life practices would stay unrecognizable and invisible for visitors and stakeholders. Thus, the main goal of this article is to understand the relation between short-term bottom-up initiatives and long-term top-down strategic planning of specific ecotourism destinations, one that would embrace the traditional ways of rural community life. The contribution of this study, in addition to documenting and illustrating “traditional wisdom” of the specific rural community placed in the protected area which encompasses a particular local social system, will be reflected in the creation of a set of guidelines for sustainable, rural, community-based ecotourism as a soft-driver development of protected areas near big cities of the postsocialist countries.

  2. Proactive restoration: planning, implementation, and early results of silvicultural strategies for increasing resilience against gypsy moth infestation in upland oak forests on the Daniel Boone National Forest, Kentucky

    Science.gov (United States)

    Callie Schweitzer; Stacy L. Clark; Kurt W. Gottschalk; Jeff Stringer; Robbie Sitzlar

    2014-01-01

    Determining targets in forest restoration is a complicated task that can be facilitated by cooperative partnerships. Too often restoration plans are implemented after adverse events that cause widespread tree mortality, such as drought or insect outbreaks, have occurred. Reactive management precludes the use of preemptive management techniques that can result in more...

  3. Site specific plan

    International Nuclear Information System (INIS)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs

  4. Ecological restoration should be redefined for the twenty-first century.

    Science.gov (United States)

    Martin, David M

    2017-09-24

    Forty years ago, ecological restoration was conceptualized through a natural science lens. Today, ecological restoration has evolved into a social and scientific concept. The duality of ecological restoration is acknowledged in guidance documents on the subject but is not apparent in its definition. Current definitions reflect our views about what ecological restoration does but not why we do it. This viewpoint does not give appropriate credit to contributions from social sciences, nor does it provide compelling goals for people with different motivating rationales to engage in or support restoration. In this study, I give a concise history of the conceptualization and definition of ecological restoration, and I propose an alternative definition and corresponding viewpoint on restoration goal-setting to meet twenty-first century scientific and public inquiry.

  5. The RESTORE program of restorative justice for sex crimes: vision, process, and outcomes.

    Science.gov (United States)

    Koss, Mary P

    2014-06-01

    The article reports empirical evaluation of RESTORE, a restorative justice (RJ) conferencing program adapted to prosecutor-referred adult misdemeanor and felony sexual assaults. RESTORE conferences included voluntary enrollment, preparation, and a face-to-face meeting where primary and secondary victims voice impacts, and responsible persons acknowledge their acts and together develop a re-dress plan that is supervised for 1 year. Process data included referral and consent rates, participant characteristics, observational ratings of conferences compared with program design, services delivered, and safety monitoring. Outcome evaluation used 22 cases to assess (a) pre-post reasons for choosing RESTORE, (b) preparation and conference experiences, (c) overall program and justice satisfaction, and (d) completion rates. This is the first peer-reviewed quantitative evaluation of RJ conferencing for adult sexual assault. Although the data have limitations, the results support cautious optimism regarding feasibility, safety, and satisfactory outcomes. They help envision how conferencing could expand and individualize justice options for sexual assault.

  6. Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-08-01

    This characterization plan has been developed as part of the U.S. Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  7. Big rock point restoration project BWR major component removal, packaging and shipping - planning and experience

    International Nuclear Information System (INIS)

    Milner, T.; Dam, S.; Papp, M.; Slade, J.; Slimp, B.; Nurden, P.

    2001-01-01

    The Big Rock Point boiling water reactor (BWR) at Charlevoix, MI was permanently shut down on August 29th 1997. In 1999 BNFL Inc.'s Reactor Decommissioning Group (RDG) was awarded a contract by Consumers Energy (CECo) for the Big Rock Point (BRP) Major Component Removal (MCR) project. BNFL Inc. RDG has teamed with MOTA, Sargent and Lundy and MDM Services to plan and execute MCR in support of the facility restoration project. The facility restoration project will be completed by 2005. Key to the success of the project has been the integration of best available demonstrated technology into a robust and responsive project management approach, which places emphasis on safety and quality assurance in achieving project milestones linked to time and cost. To support decommissioning of the BRP MCR activities, a reactor vessel (RV) shipping container is required. Discussed in this paper is the design and fabrication of a 10 CFR Part 71 Type B container necessary to ship the BRP RV. The container to be used for transportation of the RV to the burial site was designed as an Exclusive Use Type B package for shipment and burial at the Barnwell, South Carolina (SC) disposal facility. (author)

  8. Restoration of opencast coal mining sites

    Energy Technology Data Exchange (ETDEWEB)

    Brent-Jones, E.

    1983-10-01

    The paper describes the measures taken by the NCB Opencast Executive in the restoration of opencast sites on completion of mining. Soil surveys are carried out before mining and these, together with geological information, enable a comprehensive soil restoration strategy to be worked out. The soils replacement plan shows the location and thickness of soils to be replaced, and whether special treatment is required to improve the condition of the soil. The equipment that has been developed to cope with the heavy restoration work is described and the conditions under which it is used are given.

  9. A mangrove creek restoration plan utilizing hydraulic modeling

    Science.gov (United States)

    Despite the valuable ecosystem services provided by mangrove ecosystems they remain threatened around the globe. As a result, the restoration of mangrove forests has become an important topic of research. Urban development has been a primary cause for mangrove destruction and d...

  10. A Synthesis of Environmental and Plant Community Data for Tidal Wetland Restoration Planning in the Lower Columbia River and Estuary

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Borde, Amy B.; Cullinan, Valerie I.

    2013-12-01

    This report reanalyzes and synthesizes previously existing environmental and plant community data collected by PNNL at 55 tidal wetlands and 3 newly restored sites in the lower Columbia River and estuary (LCRE) between 2005 and 2011. Whereas data were originally collected for various research or monitoring objectives of five studies, the intent of this report is to provide only information that will have direct utility in planning tidal wetland restoration projects. Therefore, for this report, all tidal wetland data on plants and the physical environment, which were originally developed and reported by separate studies, were tabulated and reanalyzed as a whole. The geographic scope of the data collected in this report is from Bonneville Lock and Dam to the mouth of the Columbia River

  11. Environmental Restoration Program pollution prevention checklist guide for the feasibility study project phase

    International Nuclear Information System (INIS)

    1993-09-01

    Feasibility studies (FS) determine what remedial alternatives are presented to regulators for site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best remedial option. The purpose of this checklist guide is to assist the user in incorporating pollution prevention/waste minimization (PP/WM) in all FS phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  12. LANL environmental restoration site ranking system: System description. Final report

    International Nuclear Information System (INIS)

    Merkhofer, L.; Kann, A.; Voth, M.

    1992-01-01

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides

  13. LANL environmental restoration site ranking system: System description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Merkhofer, L.; Kann, A.; Voth, M. [Applied Decision Analysis, Inc., Menlo Park, CA (United States)

    1992-10-13

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides.

  14. Summary of operations and performance of the Murdock site restoration project in June 2005-December 2006.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-05-31

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the initial period of systems operation, from June 2005 through December 2006. In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the initial period of operation.

  15. Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)

    International Nuclear Information System (INIS)

    1995-09-01

    The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: sm-bullet Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) sm-bullet Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as open-quotes lowclose quotes hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with open-quotes moderateclose quotes or open-quotes highclose quotes hazard classifications

  16. Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: {sm_bullet} Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) {sm_bullet} Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as {open_quotes}low{close_quotes} hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with {open_quotes}moderate{close_quotes} or {open_quotes}high{close_quotes} hazard classifications.

  17. Ecological and Social Dimensions of Ecosystem Restoration in the Nordic Countries

    Directory of Open Access Journals (Sweden)

    Dagmar Hagen

    2013-12-01

    Full Text Available An international overview of the extent and type of ecological restoration can offer new perspectives for understanding, planning, and implementation. The Nordic countries, with a great range of natural conditions but historically similar social and political structures, provide an opportunity to compare restoration approaches and efforts across borders. The aim of this study was to explore variation in ecological restoration using the Nordic countries as an example. We used recent national assessments and expert evaluations of ecological restoration. Restoration efforts differed among countries: forest and peatland restoration was most common in Finland, freshwater restoration was most common in Sweden, restoration of natural heathlands and grasslands was most common in Iceland, restoration of natural and semi-cultural heathlands was most common in Norway, and restoration of cultural ecosystems, mainly abandoned agricultural land, was most common in Denmark. Ecological restoration currently does not occur on the Faroe Islands. Economic incentives influence ecological restoration and depend on laws and policies in each country. Our analyses suggest that habitat types determine the methods of ecological restoration, whereas socio-economic drivers are more important for the decisions concerning the timing and location of restoration. To improve the understanding, planning, and implementation of ecological restoration, we advocate increased cooperation and knowledge sharing across disciplines and among countries, both in the Nordic countries and internationally. An obvious advantage of such cooperation is that a wider range of experiences from different habitats and different socio-economic conditions becomes available and thus provides a more solid basis for developing practical solutions for restoration methods and policies.

  18. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Rev. No. 0

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2006-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site (NTS), Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]); (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk; (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Department of Environmental Protection (NDEP), where the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) will reach consensus with the NDEP before beginning the next phase of work. Corrective Action Unit 553 is located in Areas 19 and 20 of the NTS, approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 553 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: 19-99-01, Mud Spill; 19-99-11, Mud Spill; 20-09-09, Mud Spill; and 20-99-03, Mud Spill. There is sufficient information and process

  19. The Ecosystem Functions Model: A Tool for Restoration Planning

    National Research Council Canada - National Science Library

    Hickey, John T; Dunn, Chris N

    2004-01-01

    .... Project teams can use the EFM to visualize existing ecologic conditions, highlight promising restoration sites, and assess and rank alternatives according to the relative enhancement (or decline...

  20. Modelling chestnut biogeography for American chestnut restoration

    DEFF Research Database (Denmark)

    Fei, Songlin; Liang, Liang; Paillet, Frederick L.

    2012-01-01

    Aim Chestnuts (Castanea spp.) are ecologically and economically important species. We studied the general biology, distribution and climatic limits of seven chestnut species from around the world. We provided climatic matching of Asiatic species to North America to assist the range-wide restoration...... American chestnut appears feasible if a sufficiently diverse array of Chinese chestnut germplasm is used as a source of blight resistance. Our study provided a between-continent climate matching approach to facilitate the range-wide species restoration, which can be readily applied in planning...... the restoration of other threatened or endangered species....

  1. South Bay Salt Pond Restoration Project: Planning Phase at Southern Eden Landing

    Science.gov (United States)

    This project will complete the design and permits to restore 1,300 acres of tidal wetlands, provide 3.5 miles shoreline protection, and accelerate wetlands restoration at the Eden Landing Ecological Reserve.

  2. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  4. Public Participation Plan

    International Nuclear Information System (INIS)

    1993-07-01

    The purpose of this Public Participation Plan is to describe the US Department of Energy's (DOE) plan for involving the public in the decision-making process for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The plan describes how the DOE will meet the public participation requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, as amended, and of the National Environmental Policy Act (NEPA) of 1969. It includes the UMTRA Project Office plans for complying with DOE Order 5440.1D and for implementing the DOE's Public Participation Policy for Environmental Restoration and Waste Management (1992) and Public Participation Guidance for Environmental Restoration and Waste Management (1993)

  5. Melter Disposal Strategic Planning Document

    Energy Technology Data Exchange (ETDEWEB)

    BURBANK, D.A.

    2000-09-25

    This document describes the proposed strategy for disposal of spent and failed melters from the tank waste treatment plant to be built by the Office of River Protection at the Hanford site in Washington. It describes program management activities, disposal and transportation systems, leachate management, permitting, and safety authorization basis approvals needed to execute the strategy.

  6. The science and practice of river restoration

    Science.gov (United States)

    Wohl, Ellen; Lane, Stuart N.; Wilcox, Andrew C.

    2015-08-01

    River restoration is one of the most prominent areas of applied water-resources science. From an initial focus on enhancing fish habitat or river appearance, primarily through structural modification of channel form, restoration has expanded to incorporate a wide variety of management activities designed to enhance river process and form. Restoration is conducted on headwater streams, large lowland rivers, and entire river networks in urban, agricultural, and less intensively human-altered environments. We critically examine how contemporary practitioners approach river restoration and challenges for implementing restoration, which include clearly identified objectives, holistic understanding of rivers as ecosystems, and the role of restoration as a social process. We also examine challenges for scientific understanding in river restoration. These include: how physical complexity supports biogeochemical function, stream metabolism, and stream ecosystem productivity; characterizing response curves of different river components; understanding sediment dynamics; and increasing appreciation of the importance of incorporating climate change considerations and resiliency into restoration planning. Finally, we examine changes in river restoration within the past decade, such as increasing use of stream mitigation banking; development of new tools and technologies; different types of process-based restoration; growing recognition of the importance of biological-physical feedbacks in rivers; increasing expectations of water quality improvements from restoration; and more effective communication between practitioners and river scientists.

  7. Light Duty Utility Arm interface control document plan

    Energy Technology Data Exchange (ETDEWEB)

    Engstrom, J.W.

    1994-12-27

    This document describes the interface control documents that will be used to identify and control interface features throughout all phases of the Light Duty Utility Arm (LDUA) development and design. After the system is built, delivered and installed in the Cold Test Facility and later at the tank farm, the Interface Control Documents can be used in maintaining the configuration control process. The Interface Control Document will consist of Interface Control Drawings and a data base directly tied to the Interface Control Drawings. The data base can be used as an index to conveniently find interface information. Design drawings and other text documents that contain interface information will appear in the database. The Interface Control Drawings will be used to document and control the data and information that define the interface boundaries between systems, subsystems and equipment. Also, the interface boundaries will define the areas of responsibility for systems and subsystems. The drawing will delineate and identify all the physical and functional interfaces that required coordination to establish and maintain compatibility between the co-functioning equipment, computer software, and the tank farm facilities. An appendix contains the Engineering interface control database system riser manual.

  8. Light Duty Utility Arm interface control document plan

    International Nuclear Information System (INIS)

    Engstrom, J.W.

    1994-01-01

    This document describes the interface control documents that will be used to identify and control interface features throughout all phases of the Light Duty Utility Arm (LDUA) development and design. After the system is built, delivered and installed in the Cold Test Facility and later at the tank farm, the Interface Control Documents can be used in maintaining the configuration control process. The Interface Control Document will consist of Interface Control Drawings and a data base directly tied to the Interface Control Drawings. The data base can be used as an index to conveniently find interface information. Design drawings and other text documents that contain interface information will appear in the database. The Interface Control Drawings will be used to document and control the data and information that define the interface boundaries between systems, subsystems and equipment. Also, the interface boundaries will define the areas of responsibility for systems and subsystems. The drawing will delineate and identify all the physical and functional interfaces that required coordination to establish and maintain compatibility between the co-functioning equipment, computer software, and the tank farm facilities. An appendix contains the Engineering interface control database system riser manual

  9. Summary of operations and performance of the Murdock site restoration project in 2007.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-06-03

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief

  10. Restoration and economics: A union waiting to happen?

    Science.gov (United States)

    Alicia S.T. Robbins; Jean M. Daniels

    2012-01-01

    In this article, our objective is to introduce economics as a tool for the planning, prioritization, and evaluation of restoration projects. Studies that develop economic estimates of public values for ecological restoration employ methods that may be unfamiliar to practitioners. We hope to address this knowledge gap by describing economic concepts in the context of...

  11. Technical approach document

    International Nuclear Information System (INIS)

    1988-04-01

    This document describes the general technical approaches and design criteria adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPS standards. This document is a revision to the original document. Major revisions were made to the sections in riprap selection and sizing, and ground-water; only minor revisions were made to the remainder of the document. The US Nuclear Regulatory Commission (NRC) has prepared a Standard Review Plan (NRC-SRP) which describes factors to be considered by the NRC in approving the RAP. Sections 3.0, 4.0, 5.0, and 7.0 of this document are arranged under the same headings as those used in the NRC-SRP. This approach is adopted in order to facilitate joint use of the documents. Section 2.0 (not included in the NRC-SRP) discusses design considerations; Section 3.0 describes surface-water hydrology and erosion control; Section 4.0 describes geotechnical aspects of pile design; Section 5.0 discusses the Alternate Site Selection Process; Section 6.0 deals with radiological issues (in particular, the design of the radon barrier); Section 7.0 discusses protection of groundwater resources; and Section 8.0 discusses site design criteria for the RAC

  12. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449 ampersand D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit

  13. Robustness Area Technique Developing Guidelines for Power System Restoration

    Directory of Open Access Journals (Sweden)

    Paulo Murinelli Pesoti

    2017-01-01

    Full Text Available This paper proposes a novel energy based technique called the Robustness Area (RA technique that measures power system robustness levels, as a helper for planning Power System Restorations (PSRs. The motivation is on account of the latest blackouts in Brazil, where the local Independent System Operator (ISO encountered difficulties related to circuit disconnections during the restoration. The technique identifies vulnerable and robust buses, pointing out system areas that should be firstly reinforced during PSR, in order to enhance system stability. A Brazilian power system restoration area is used to compare the guidelines adopted by the ISO with a more suitable new plan indicated by the RA tool. Active power and reactive power load margin and standing phase angle show the method efficiency as a result of a well balanced system configuration, enhancing the restoration performance. Time domain simulations for loop closures and severe events also show the positive impact that the proposed tool brings to PSRs.

  14. The relationship between ecological restoration and the ecosystem services concept

    Directory of Open Access Journals (Sweden)

    Sasha Alexander

    2016-03-01

    Full Text Available Ecological restoration and the mainstreaming of the concept of ecosystem services will be critical if global society is to move toward sustainability. Conference of the Parties 21 (COP21 of the United Nations Framework Convention on Climate Change and COP12 of the Convention on Biological Diversity should help foster support for vastly increased investment in the better management and restoration of natural capital. Large-scale restoration demonstrably improves ecological functioning to sustain both biodiversity and human well-being. However, much progress is needed to improve the effectiveness and cost efficiency of any restoration. The ecosystem services concept provides a framework for identifying the types of restorative interventions needed to target different forms and degrees of degradation, and achieve goals related to both ecosystem health and delivery of services to people. Moreover, it can strengthen the argument for, and planning of, large-scale restoration and conservation of natural capital. We use case studies from four continents to help demonstrate how the interconnection between ecological restoration and the ecosystem services concept is being utilized in land-use planning and enlightened ecosystem management. We offer ways in which this relationship can be better understood and communicated to support the scaling up of restoration activities to the landscape and regional scales across the full spectrum of land uses and ecosystem types.

  15. Macroinvertebrate community assembly in pools created during peatland restoration

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Lee E., E-mail: l.brown@leeds.ac.uk; Ramchunder, Sorain J.; Beadle, Jeannie M.; Holden, Joseph

    2016-11-01

    providing extensive new habitat that is largely equivalent to natural pools. More generally, we suggest that assembly theory could provide new benchmarks for planning and evaluating ecological restoration success. - Highlights: • We assessed the benefits of peatland pool restoration for aquatic biodiversity. • Biomonitoring metrics and community composition suggested different outcomes to restoration. • Null model approaches provided a clearer suggestion that restoration was successful. • Analysis of assembly processes should be used when planning and evaluating ecological restorations.

  16. Macroinvertebrate community assembly in pools created during peatland restoration

    International Nuclear Information System (INIS)

    Brown, Lee E.; Ramchunder, Sorain J.; Beadle, Jeannie M.; Holden, Joseph

    2016-01-01

    providing extensive new habitat that is largely equivalent to natural pools. More generally, we suggest that assembly theory could provide new benchmarks for planning and evaluating ecological restoration success. - Highlights: • We assessed the benefits of peatland pool restoration for aquatic biodiversity. • Biomonitoring metrics and community composition suggested different outcomes to restoration. • Null model approaches provided a clearer suggestion that restoration was successful. • Analysis of assembly processes should be used when planning and evaluating ecological restorations.

  17. The influence of specialty training, experience, discussion and reflection on decision making in modern restorative treatment planning.

    Science.gov (United States)

    Alani, A; Bishop, K; Djemal, S

    2011-02-26

    initial treatment decisions. These personal skills may become more significant when planning treatment for complex restorative cases.

  18. Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  19. VOC-Arid Integrated Demonstration guide to preparation of demonstration documents

    International Nuclear Information System (INIS)

    Jensen, E.J.; Brouns, T.M.; Koegler, K.J.; McCabe, G.H.; Morris, F.A.

    1994-06-01

    This guide has been prepared by Demonstration Operations of the Volatile Organic Compound-Arid Integrated Demonstration (VOC-Arid ID). Its purpose is to describe demonstration documents, designate responsibilities for these documents, and guide the Principal Investigator (PI) and others in their preparation. The main emphasis of this guide is to describe the documentation required of the PI. However, it does cover some of the responsibilities of other members of the VOC-Arid ID team. The VOC-Arid ID is one of several US Department of Energy (DOE) integrated demonstrations designed to support the demonstration of emerging environmental management and restoration technologies. The principal objective of the VOC-Arid ID is to identify, develop, and demonstrate new and innovative technologies for environmental restoration at arid or semiarid sites containing volatile organic compounds with or without associated contamination (e.g., radionuclides and metals)

  20. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    International Nuclear Information System (INIS)

    1995-08-01

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems' ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL's groundwater problems

  1. Environmental Restoration Strategic Plan. Remediating the nuclear weapons complex

    International Nuclear Information System (INIS)

    1995-08-01

    With the end of the cold war, the US has a reduced need for nuclear weapons production. In response, the Department of Energy has redirected resources from weapons production to weapons dismantlement and environmental remediation. To this end, in November 1989, the US Department of Energy (DOE) established the Office of Environmental Restoration and Waste Management (renamed the Office of Environmental Management in 1994). It was created to bring under a central authority the management of radioactive and hazardous wastes at DOE sites and inactive or shut down facilities. The Environmental Restoration Program, a major component of DOE's Environmental Management Program, is responsible for the remediation and management of contaminated environmental media (e.g., soil, groundwater, sediments) and the decommissioning of facilities and structures at 130 sites in over 30 states and territories

  2. Environmental restoration plans and activities in the Russian Federation

    International Nuclear Information System (INIS)

    Boldyrev, V.; Komarov, A.; Kuzin, R.; Shatalov, V.

    1997-01-01

    The report deals with the status of environmental restoration of uranium-contaminated sites and the methods to reduce radionuclides concentration in the solid and liquid wastes as well as their utilization potential. Attention is given to the waste utilization in agriculture and civil engineering construction. With this in view, the paper deals with waste water purification and applicable standards for natural radionuclides content in solid waste for utilization in construction activities. All works are carried out in accordance with the Special Complex Programme for environmental restoration of contaminated uranium mining and milling sites caused by the activities of the industries engaged in nuclear materials production for the Ministry of Atomic Energy of the Russian Federation. The Programme is an integral part of the Federal Programme ''Conversion of Russian Defense Industries in 1993-2000''. (author)

  3. Feasibility of hospital-initiated non-facilitator assisted advance care planning documentation for patients with palliative care needs.

    Science.gov (United States)

    Kok, Maaike; van der Werff, Gertruud F M; Geerling, Jenske I; Ruivenkamp, Jaap; Groothoff, Wies; van der Velden, Annette W G; Thoma, Monique; Talsma, Jaap; Costongs, Louk G P; Gans, Reinold O B; de Graeff, Pauline; Reyners, Anna K L

    2018-05-24

    Advance Care Planning (ACP) and its documentation, accessible to healthcare professionals regardless of where patients are staying, can improve palliative care. ACP is usually performed by trained facilitators. However, ACP conversations would be more tailored to a patient's specific situation if held by a patient's clinical healthcare team. This study assesses the feasibility of ACP by a patient's clinical healthcare team, and analyses the documented information including current and future problems within the palliative care domains. This multicentre study was conducted at the three Groningen Palliative Care Network hospitals in the Netherlands. Patients discharged from hospital with a terminal care indication received an ACP document from clinical staff (non-palliative care trained staff at hospitals I and II; specialist palliative care nurses at hospital III) after they had held ACP conversations. An anonymised copy of this ACP document was analysed. Documentation rates of patient and contact details were investigated, and documentation of current and future problems were analysed both quantitatively and qualitatively. One hundred sixty ACP documents were received between April 2013 and December 2014, with numbers increasing for each consecutive 3-month time period. Advance directives were frequently documented (82%). Documentation rates of current problems in the social (24%), psychological (27%) and spiritual (16%) domains were low compared to physical problems (85%) at hospital I and II, but consistently high (> 85%) at hospital III. Of 545 documented anticipated problems, 92% were physical or care related in nature, 2% social, 5% psychological, and will improve identification and documentation of non-physical problems remains to be investigated.

  4. Environmental Restoration and Waste Management: An Introduction. Student Edition.

    Science.gov (United States)

    Department of Energy, Washington, DC.

    This technical document focuses on the Department of Energy's (DOE) efforts to restore the environment and manage nuclear waste. This student edition was rewritten and edited by a team of high school students in order to make it "user-friendly" for high school students and the general public. The document focuses on the efforts of the…

  5. Hydrologic restoration in a dynamic subtropical mangrove-to-marsh ecotone

    Science.gov (United States)

    Howard, Rebecca J.; Day, Richard H.; Krauss, Ken W.; From, Andrew S.; Allain, Larry K.; Cormier, Nicole

    2017-01-01

    Extensive hydrologic modifications in coastal regions across the world have occurred to support infrastructure development, altering the function of many coastal wetlands. Wetland restoration success is dependent on the existence of hydrologic regimes that support development of appropriate soils and the growth and persistence of wetland vegetation. In Florida, United States, the Comprehensive Everglades Restoration Program (CERP) seeks to restore, protect, and preserve water resources of the greater Everglades region. Herein we describe vegetation dynamics in a mangrove-to-marsh ecotone within the impact area of a CERP hydrologic restoration project currently under development. Vegetation communities are also described for a similar area outside the project area. We found that vegetation shifts within the impact area occurred over a 7-year period; cover of herbaceous species varied by location, and an 88% increase in the total number of mangrove seedlings was documented. We attribute these shifts to the existing modified hydrologic regime, which is characterized by a low volume of freshwater sheet flow compared with historical conditions (i.e. before modification), as well as increased tidal influence. We also identified a significant trend of decreasing soil surface elevation at the impact area. The CERP restoration project is designed to increase freshwater sheet flow to the impact area. Information from our study characterizing existing vegetation dynamics prior to implementation of the restoration project is required to allow documentation of long-term project effects on plant community composition and structure within a framework of background variation, thereby allowing assessment of the project's success in restoring critical ecosystem functions.

  6. Overcoming restoration paradigms: value of the historical record and metapopulation dynamics in native oyster restoration

    Directory of Open Access Journals (Sweden)

    Romuald N. Lipcius

    2015-09-01

    Full Text Available Restoration strategies for native oyster populations rely on multiple sources of information, which often conflict due to time- and space-varying patterns in abundance and distribution. For instance, strategies based on population connectivity and disease resistance can differ, and extant and historical records of abundance and distribution are often at odds, such that the optimal strategy is unclear and valuable restoration sites may be excluded from consideration. This was the case for the Lynnhaven River subestuary of lower Chesapeake Bay, which was deemed unsuitable for Eastern Oyster restoration based on physical conditions, disease challenge, and extant oyster abundance. Consequently, we (i evaluated previously unknown historical data from the 1800s, (ii quantified extant oyster recruitment and abundance, physical conditions, and disease presence on constructed restoration reefs and alternative substrates, and (iii assessed simulations from biophysical models to identify potential restoration sites in the metapopulation. The collective data distinguished numerous restoration sites (i in the polyhaline zone (salinity 18.4-22.2 where disease resistance is evolving, (ii where oysters were abundant in the late 1800s-early 1900s, (iii of recent high recruitment, abundance and survival, despite consistent and elevated disease challenge, and (iv interconnected as a metapopulation via larval dispersal. Moreover, a network of constructed restoration reefs met size structure, abundance and biomass standards of restoration success. These findings demonstrate that assumptions about the suitability of sites for oyster restoration based on individual processes can be severely flawed, and that in-depth examination of multiple processes and sources of information are required for oyster reef restoration plans to maximize success. We use these findings and previous information to recommend a strategy for successful restoration of subtidal oyster reefs

  7. Implementing 10 CFR 830 at the FEMP Silos: Nuclear Health and Safety Plans as Documented Safety Analysis

    International Nuclear Information System (INIS)

    Fisk, Patricia; Rutherford, Lavon

    2003-01-01

    The objective of the Silos Project at the Fernald Closure Project (FCP) is to safely remediate high-grade uranium ore residues (Silos 1 and 2) and metal oxide residues (Silo 3). The evolution of Documented Safety Analyses (DSAs) for these facilities has reflected the changes in remediation processes. The final stage in silos DSAs is an interpretation of 10 CFR 830 Safe Harbor Requirements that combines a Health and Safety Plan with nuclear safety requirements. This paper will address the development of a Nuclear Health and Safety Plan, or N-HASP

  8. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Decontamination Pond Facility. Revision 1

    International Nuclear Information System (INIS)

    1996-08-01

    This plan presents the strategy for the characterization of the Area 6 Decontamination Pond Facility at the Nevada Test Site which will be conducted for the US Department of Energy, Nevada Operations Office, Environmental Restoration Division. The objectives of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste. The scope of the characterization may include surface radiation survey(s), surface soil sampling, subsurface soil boring (i.e., drilling), and sampling of soil in and around the pond; in situ sampling of the soil within subsurface soil borings; and sample analysis for both site characterization and waste management purposes

  9. Protocol for a national prevalence study of advance care planning documentation and self-reported uptake in Australia.

    Science.gov (United States)

    Ruseckaite, Rasa; Detering, Karen M; Evans, Sue M; Perera, Veronica; Walker, Lynne; Sinclair, Craig; Clayton, Josephine M; Nolte, Linda

    2017-11-03

    Advance care planning (ACP) is a process between a person, their family/carer(s) and healthcare providers that supports adults at any age or stage of health in understanding and sharing their personal values, life goals and preferences regarding future medical care. The Australian government funds a number of national initiatives aimed at increasing ACP uptake; however, there is currently no standardised Australian data on formal ACP documentation or self-reported uptake. This makes it difficult to evaluate the impact of ACP initiatives. This study aims to determine the Australian national prevalence of ACP and completion of Advance Care Directives (ACDs) in hospitals, aged care facilities and general practices. It will also explore people's self-reported use of ACP and views about the process. Researchers will conduct a national multicentre cross-sectional prevalence study, consisting of a record audit and surveys of people aged 65 years or more in three sectors. From 49 participating Australian organisations, 50 records will be audited (total of 2450 records). People whose records were audited, who speak English and have a decision-making capacity will also be invited to complete a survey. The primary outcome measure will be the number of people who have formal or informal ACP documentation that can be located in records within 15 min. Other outcomes will include demographics, measure of illness and functional capacity, details of ACP documentation (including type of document), location of documentation in the person's records and whether current clinical care plans are consistent with ACP documentation. People will be surveyed, to measure self-reported interest, uptake and use of ACP/ACDs, and self-reported quality of life. This protocol has been approved by the Austin Health Human Research Ethics Committee (reference HREC/17/Austin/83). Results will be submitted to international peer-reviewed journals and presented at international conferences. ACTRN

  10. Classifications for Coastal Wetlands Planning, Protection and Restoration Act site-specific projects: 2008 and 2009

    Science.gov (United States)

    Jones, William R.; Garber, Adrienne

    2012-01-01

    The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the analysis of high-resolution, color-infrared aerial photography at the U.S. Geological Survey's National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change. Several challenges are associated with the land-water interpretation process. Primarily, land-water classifications are often complicated by the presence of floating aquatic vegetation that occurs throughout the freshwater systems of coastal Louisiana and that is sometimes difficult to differentiate from emergent marsh. Other challenges include tidal fluctuations and water movement from strong winds, which may result in flooding and inundation of emergent marsh during certain conditions. Compensating for these events is difficult but possible by using other sources of imagery to verify marsh conditions for other

  11. DOCUMENTING LIVING MONUMENTS IN INDONESIA: METHODOLOGY FOR SUSTAINABLE UTILITY

    Directory of Open Access Journals (Sweden)

    F. Suryaningsih

    2013-07-01

    Full Text Available The systematic documentation of cultural heritage in Indonesia has been developed after the establishment of Bataviaasch Genootschap van Kunsten en Wetenschappen (1778 and De Oudheidkundige Dienst (1913 by the Netherlands Indies government. After Indonesian independent, the tasks of cultural heritage documentation take over by The Ministry of Culture (now become The Ministry of Education of Culture with focus on the ancient and classical heritage, so called dead monument. The needed of comprehensive documentation data regarding cultural heritage become significant issues since the government and private sector pay attention to the preservation of heritage building in the urban site, so called living monument. The archives of original drawing plan many times do not fit with the existing condition, while the conservation plan demands a document such as built drawing plan to work on. The technology, methodology and system to provide such comprehensive document of heritage building and site become important, to produce good conservation plan and heritage building regular maintenance. It means the products will have a sustainable and various utility values. Since 1994, Documentation Centre for Architecture – Indonesia (PDA, has established to meet the needs of a comprehensive data of heritage building (living monuments, to utilized as basic document for conservation planning. Not only provide document of the digital drawing such site plan, plan, elevation, section and details of architecture elements, but also document of historic research, material analysis and completed with diagnosis and mapping of building damages. This manuscript is about PDA field experience, working in this subject issue

  12. Documenting Living Monuments in Indonesia: Methodology for Sustainable Utility

    Science.gov (United States)

    Suryaningsih, F.; Purwestri, N.

    2013-07-01

    The systematic documentation of cultural heritage in Indonesia has been developed after the establishment of Bataviaasch Genootschap van Kunsten en Wetenschappen (1778) and De Oudheidkundige Dienst (1913) by the Netherlands Indies government. After Indonesian independent, the tasks of cultural heritage documentation take over by The Ministry of Culture (now become The Ministry of Education of Culture) with focus on the ancient and classical heritage, so called dead monument. The needed of comprehensive documentation data regarding cultural heritage become significant issues since the government and private sector pay attention to the preservation of heritage building in the urban site, so called living monument. The archives of original drawing plan many times do not fit with the existing condition, while the conservation plan demands a document such as built drawing plan to work on. The technology, methodology and system to provide such comprehensive document of heritage building and site become important, to produce good conservation plan and heritage building regular maintenance. It means the products will have a sustainable and various utility values. Since 1994, Documentation Centre for Architecture - Indonesia (PDA), has established to meet the needs of a comprehensive data of heritage building (living monuments), to utilized as basic document for conservation planning. Not only provide document of the digital drawing such site plan, plan, elevation, section and details of architecture elements, but also document of historic research, material analysis and completed with diagnosis and mapping of building damages. This manuscript is about PDA field experience, working in this subject issue

  13. Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 2, Interim business systems guidance

    International Nuclear Information System (INIS)

    1994-09-01

    As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization's objectives, inherent data relationships, and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production. This document focuses on the Business Systems Architecture

  14. Environmental restoration plans and activities in Hungary: 1995-1996 progress report

    International Nuclear Information System (INIS)

    Juhasz, L.; Szerbin, P.; Lendvai, Z.; Csovari, M.; Benkovics, I.

    1997-01-01

    After more dm 35 years of operation, the uranium mining and milling activities in Hungary will be finally shut down by the end of 1997. The surveying programme on the affected area was started in 1991, and the first phase of the remediation project was launched in 1992-93. In the last few years a new concept and strategy has been prepared for the next phase of restoration tasks. The restoration will mainly follow the principle of application of step by step approach to the solution of each task. Due to lack of approved national regulations, authorization in the form of letters are obtained on specific issues of remedial action on a case by case basis. The radiological requirements for both reuse and restoration of the affected areas call for setting up radiation limits. The radiation monitoring and radiological characterization of the affected areas both during operation as well as after restoration are being systematically performed. The monitoring of water contamination is given high priority, because the uranium milling and milling sites have a lot of surface water and aquifers. So far, 3 mines have been shut down while 2 mines are still operating. After final close down the mines will be flooded, and the monitoring system will be expanded and upgraded. Major portion of waste rock piles have been restored, and a number of experiments and investigations have been performed for decreasing the contamination of heap leaching and for selection of cover layers of tailings ponds. As a prelude to decommissioning of milling facility preliminary survey of items and equipment for reuse or disposal has been started. (author)

  15. Restoring Detroit's Street Lighting System

    Energy Technology Data Exchange (ETDEWEB)

    Kinzey, Bruce R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-10-21

    The City of Detroit is undertaking a comprehensive restoration of its street lighting system that includes transitioning the existing high-pressure sodium (HPS) sources to light-emitting diode (LED). Detroit’s well-publicized financial troubles over the last several years have added many hurdles and constraints to this process. Strategies to overcome these issues have largely been successful, but have also brought some mixed results. This document provides an objective review of the circumstances surrounding the system restoration, the processes undertaken and decisions made, and the results so far.

  16. Savannah River Site's Site Specific Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering

  17. Emergency planning zone reduction

    International Nuclear Information System (INIS)

    Edwards, C.

    2002-01-01

    This paper describes the process used by a large industrial Department of Energy (DOE) site to communicate changing hazards to its stakeholders and install the confidence necessary to implement the resulting emergency planning changes. Over the last decade as the sites missions have shifted from full-scale production to a greater emphasis on environmental restoration and waste management, the off-site threat from its operations has substantially decreased. The challenge was to clearly communicate the reduced hazards, install confidence in the technical analysis that documented the hazard reduction, and obtain stakeholder buy-in on the path forward to change the emergency management program. The most significant change to the emergency management program was the proposed reduction of the sites Emergency Planning Zone (EPZ). As the EPZ is defined as an area for which planning is needed to protect the public in the event of an accident, the process became politically challenging. An overview of how the site initially approached this problem and then learned to more substantially involve the state and local emergency preparedness agencies and the local Citizens Advisory Board will be presented. (author)

  18. Restoring lepidopteran diversity in a tropical dry forest: relative importance of restoration treatment, tree identity and predator pressure

    Directory of Open Access Journals (Sweden)

    Lizet Solis-Gabriel

    2017-05-01

    Full Text Available Tropical dry forests (TDFs have been widely transformed by human activities worldwide and the ecosystem services they provide are diminishing. There has been an urgent call for conservation and restoration of the degraded lands previously occupied by TDFs. Restoration experiences aim to recover species diversity and ecological functions. Different restoration strategies have been used to maximize plant performance including weeding, planting or using artificial mulching. In this investigation, we evaluated whether different restoration practices influence animal arrival and the reestablishment of biotic interactions. We particularly evaluated lepidopteran larvae diversity and caterpillar predation on plants established under different restoration treatments (mulching, weeding and control in the Pacific West Coast of México. This study corroborated the importance of plant host identity for lepidopteran presence in a particular area. Lepidopteran diversity and herbivory rates were not affected by the restoration treatment but they were related to tree species. In contrast, caterpillar predation marks were affected by restoration treatment, with a greater number of predation marks in control plots, while caterpillar predation marks among plant species were not significantly different. This study highlights the importance of considering the introduction of high plant species diversity when planning TDF restoration to maximize lepidopteran diversity and ecosystem functioning.

  19. Restoring lepidopteran diversity in a tropical dry forest: relative importance of restoration treatment, tree identity and predator pressure.

    Science.gov (United States)

    Solis-Gabriel, Lizet; Mendoza-Arroyo, Wendy; Boege, Karina; Del-Val, Ek

    2017-01-01

    Tropical dry forests (TDFs) have been widely transformed by human activities worldwide and the ecosystem services they provide are diminishing. There has been an urgent call for conservation and restoration of the degraded lands previously occupied by TDFs. Restoration experiences aim to recover species diversity and ecological functions. Different restoration strategies have been used to maximize plant performance including weeding, planting or using artificial mulching. In this investigation, we evaluated whether different restoration practices influence animal arrival and the reestablishment of biotic interactions. We particularly evaluated lepidopteran larvae diversity and caterpillar predation on plants established under different restoration treatments (mulching, weeding and control) in the Pacific West Coast of México. This study corroborated the importance of plant host identity for lepidopteran presence in a particular area. Lepidopteran diversity and herbivory rates were not affected by the restoration treatment but they were related to tree species. In contrast, caterpillar predation marks were affected by restoration treatment, with a greater number of predation marks in control plots, while caterpillar predation marks among plant species were not significantly different. This study highlights the importance of considering the introduction of high plant species diversity when planning TDF restoration to maximize lepidopteran diversity and ecosystem functioning.

  20. Repository-based software engineering program: Concept document

    Science.gov (United States)

    1992-01-01

    This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.

  1. The socioeconomic factors that facilitate or constrain restoration management: Watershed rehabilitation and wet meadow (bofedal) restoration in the Bolivian Andes.

    Science.gov (United States)

    Hartman, Brett D; Cleveland, David A

    2018-03-01

    Restoration ecology holds promise for addressing land degradation in impoverished rural environments, provided the approach is adapted to rural development settings. While there is a need for increased integration of social dynamics in land restoration, few systematic studies exist. We explored the socioeconomic factors that influence restoration management, including local motives and perceived benefits, incentives, land tenancy, institutional factors, conflict resolution, accessibility, off-farm labor, and outmigration. The study area is a successful watershed rehabilitation and wet meadow restoration project in the Bolivian Andes that began in 1992. We used household survey methods (n = 237) to compare the communities that had conducted the most restoration management with those that had conducted the least. Results suggest that several factors facilitate investments in land restoration, including aligning restoration objectives with local motives and perceived benefits, ensuring incentives are in place to stimulate long-term investments, conflict resolution, private land tenancy, and accessibility. However, higher levels of organization and active leadership can facilitate land restoration on communal lands. Increased livelihood benefits from land restoration helped slow the rate of rural to urban migration, with 24.5% outmigration in the highest restoration management communities compared to 62.1% in the lowest restoration management communities. Results suggest that land restoration projects that integrate community development into project planning and implementation will achieve greater success. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. Summary of operations and performance of the Murdock site restoration project in 2008.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2009-06-04

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

  3. Louisiana's 2017 Master Plan for a Sustainable Coast

    Science.gov (United States)

    Haase, B.

    2017-12-01

    The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement

  4. Selecting cost-effective areas for restoration of ecosystem services.

    Science.gov (United States)

    Adame, M F; Hermoso, V; Perhans, K; Lovelock, C E; Herrera-Silveira, J A

    2015-04-01

    Selection of areas for restoration should be based on cost-effectiveness analysis to attain the maximum benefit with a limited budget and overcome the traditional ad hoc allocation of funds for restoration projects. Restoration projects need to be planned on the basis of ecological knowledge and economic and social constraints. We devised a novel approach for selecting cost-effective areas for restoration on the basis of biodiversity and potential provision of 3 ecosystem services: carbon storage, water depuration, and coastal protection. We used Marxan, a spatial prioritization tool, to balance the provision of ecosystem services against the cost of restoration. We tested this approach in a mangrove ecosystem in the Caribbean. Our approach efficiently selected restoration areas that at low cost were compatible with biodiversity targets and that maximized the provision of one or more ecosystem services. Choosing areas for restoration of mangroves on the basis carbon storage potential, largely guaranteed the restoration of biodiversity and other ecosystem services. © 2014 Society for Conservation Biology.

  5. Technology needs for environmental restoration remedial action. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  6. Environmental Restoration Program quality system requirements for the Hanford Site

    International Nuclear Information System (INIS)

    Cote, R.F.

    1993-11-01

    This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment

  7. Environmental restoration program pollution prevention checklist guide for the evaluation of alternatives project phase

    International Nuclear Information System (INIS)

    1993-09-01

    Evaluation of alternative studies determine what decontamination and decommissioning (D ampersand D) alternatives are presented to regulators for facility and site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best clean-up option. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Evaluation of Alternatives (EV) phase projects of the Environmental Restoration (ER) Program. This guide will assist users with documenting PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to help users implement and evaluate waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves, eliminating expensive process waste assessments and audit teams

  8. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    International Nuclear Information System (INIS)

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  9. Big Canyon Creek Ecological Restoration Strategy.

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Lynn; Richardson, Shannon

    2007-10-01

    then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self

  10. Alberti and Brunelleschi: the conservation of the memory toward the material’s restoration. The 3D database for documentation and the design process

    Directory of Open Access Journals (Sweden)

    Marcello Balzani

    2015-01-01

    Full Text Available The complexity of the morphometric data sourcesarouses comparisons and researches among measuresand the ability to data display and directquery. The 3D database, developed in the case ofAlberti’s architectures with critical-interpretativepurposes for historians of art and architecture,also becomes a tool to simulate spatial solutionsand management and control of the constructionsite. The restoration of the Istituto degli Innocentiin Florence is effectively an opportunityto understand how morphometric data allow todevelop design solutions for the new accessibilityof the Museum based on the “measure” of Brunelleschi.By means of these two approaches, thetopic of the documentation of the “memory” isdeveloped and finalized, through query, browsingand representation techniques, to the restorationproject.

  11. Hangman Restoration Project Year-End Report FY2008.

    Energy Technology Data Exchange (ETDEWEB)

    Coeur d' Alene Tribe Department of Natural Resources.

    2008-11-12

    This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

  12. RESTORATION OF ACCOUNTING A OF THE ENTERPRISE: PREREQUISITE AND ESSENCE

    Directory of Open Access Journals (Sweden)

    Luhova Olha

    2018-01-01

    Full Text Available Introduction. The accounting department regulates the work of all departments and documents the changes that take place at the enterprise in detail. Ukrainian legislation clearly defines the necessity and procedure for proper accounting by business entities. The main requirement is a going concern of accounting: from the date of registration of the enterprise to its liquidation. However, in practice, business entities do not always comply with the requirements of the legislation. Falsity or lack of reporting, poor quality of accounting can interfere cooperation with lenders, business partners and investors. In addition, the law provides administrative responsibility in violation of accounting. Purpose. To research the reasons that caused the restoration of accounting, to reveal the purpose, variants and stages of its realization. Results. The reasons that cause the company to a situation when it is necessary to restore accounting are reviewed. Late recovery and availability of accounting violations can lead to serious consequences for the enterprise. First of all, there will be problems with state authorities. Evading taxes or paying inappropriate amounts leads to administrative or even criminal responsibility. In addition, the lack of proper accounting can negatively affect the economic activity of the enterprise. Distortion of data sooner or later will cause to the fact that the company’s management will not be able to control the movement of inventories, financial assets. Possible options for restoring the accounting system are considered. Recovery may be done by a staff accountant, a private accountant which is involved in the execution of this procedure, or may be entrusted to an outsourcing accounting company. Stages of enterprise’s accounting restoration are reviewed. They are analysis of available primary documents and registers of accounting; making necessary changes in existing documents and filling out missing documents

  13. Large-scale dam removal in the northeast United States: documenting ecological responses to the Penobscot River Restoration Project

    Science.gov (United States)

    Collins, M. J.; Aponte Clarke, G.; Baeder, C.; McCaw, D.; Royte, J.; Saunders, R.; Sheehan, T.

    2012-12-01

    The Penobscot River Restoration Project aims to improve aquatic connectivity in New England's second largest watershed ( 22,000 km2) by removing the two lowermost, mainstem dams and bypassing a third dam on a principal tributary upstream. Project objectives include: restoring unobstructed access to the entire historic riverine range for five lower river diadromous species including Atlantic and shortnose sturgeon; significantly improving access to upstream habitat for six upper river diadromous species including Atlantic salmon; reconnecting trophic linkages between headwater areas and the Gulf of Maine; restoring fluvial processes to the former impoundments; improving recreational and Penobscot Nation cultural opportunities; and maintaining basin-wide hydropower output. The project is expected to have landscape-scale benefits and the need for a significant investment in long-term monitoring and evaluation to formally quantify ecosystem response has been recognized. A diverse group of federal, state, tribal, NGO, and academic partners has developed a long-term monitoring and evaluation program composed of nine studies that began in 2009. Including American Recovery and Reinvestment Act (ARRA) funding that leveraged partner contributions, we have invested nearly $2M to date in pre- and post-removal investigations that evaluate geomorphology/bed sediment, water quality, wetlands, and fisheries. Given the number of affected diadromous species and the diversity of their life histories, we have initiated six distinct, but related, fisheries investigations to document these expected changes: Atlantic salmon upstream and downstream passage efficiency using passive integrated transponder (PIT) and acoustic telemetry; fish community structure via an index of biotic integrity (IBI); total diadromous fish biomass through hydroacoustics; shortnose sturgeon spawning and habitat use via active and passive acoustic telemetry; and freshwater-marine food web interactions by

  14. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  15. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  16. Environmental restoration plan for the transfer of surplus facilities to the Facility Transition Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-08-01

    This report will provide guidance on management, coordination, and integration of plans to transition facilities to the Facility Transition Program and activities as related to the Oak Ridge National Laboratory (ORNL) Environmental Restoration Program facilities. This report gives (1) guidance on the steps necessary for identifying ORNL surplus facilities, (2) interfaces of Surveillance and Maintenance (S and M) and Isotope Facility Deactivation program managers, (3) roles and responsibilities of the facility managers, and (4) initial S and M requirements upon acceptance into the Facility Transition Program

  17. [The planned home care transfer by a local medical support hospital and the introduction to home intravenous hyper alimentation--the making of a home care patient's instruction plan document].

    Science.gov (United States)

    Shinobu, Akiko; Ohtsu, Yoko

    2004-12-01

    It is important to offer continuous medical service without interrupting everyone's various job functions at the Tama Numbu-Chiiki Hospitals in order to secure the quality and safety of home medical care to patients and their families. From 1998 up to the present, home intravenous hyper alimentation (home IVH) has been introduced by individually exchanging information that was based on items such as clinical case, doctor and caregiver in charge of the day, and introductory information. Five years have passed since we started an introduction of home IVH, and it appears that the medical cooperation of home IVH between the Minami-tama medical region and its neighboring area has been established. Then, we arranged an examination of the past 2 years based on the 57 patients who elected to choose home IVH instruction. Consequently, we created "home IVH introduction plan document" in standardizing a flow from home IVH introduction to post-hospital intervention. Since November of 2003, the plan document has been utilized and carried out to 5 patients by the end of February in 2004. This home IVH introduction plan document was able to clarify the role of medical person in connection with the patient. Therefore, we could not only share the information, but also could transfer medical care smoothly from the hospital to the patient's home.

  18. Meeting the requirements for a DOE environmental restoration project. The Fernald strategy

    International Nuclear Information System (INIS)

    Vanoss, R.L.; Risenhoover, G.M.

    1994-01-01

    Environmental Restoration (ER) of five Operable Units (OU) at Fernald Environmental Management Project (FEMP) includes compliance with the requirements of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation Recovery Act (RCRA), National Environmental Policy Act (NEPA), and DOE Orders. Each regulatory driver has differing procedural requirements for documenting calculations, decisions, and actions involved in site cleanup. Integration of documentation and avoidance of duplication can save time and money. Such savings are being achieved by OU specific application of supporting studies, revised procedures, and guidance documents. Each OU is seeking appropriate opportunities to produce single documents that simultaneously fulfill the important requirements of the other regulations and DOE orders. These opportunities are evaluated at all phases of decision making, remedial design, and remedial action. Three essential processes precede environmental restoration/remedial action at a DOE site/project: 1. Completion of decision-making documents required by governing or applicable statutes. 2. Completion of important scientific and engineering analyses of remedial alternatives, and design and implementation of the remedial solution established in the CERCLA Record of Decision (ROD). 3. Preparation of DOE-mandated documentation to record engineering evaluations and cost estimates required for budgeting, decision making, and project management. Methodology and requirements for each process have developed from long, successful practice, but independently of each other. FERMCO, as new DOE contractor at Fernald and first Environmental Restoration Management Contractor (ERMC), is committed to a process of Continuous Performance Improvement (CPI). A major reevaluation of documentation and processes for support of environmental decision-making and design of cleanup activities to remediate the five OUs at the FEMP is being undertaken

  19. Fast substation service restoration using intelligent petri-nets models

    Energy Technology Data Exchange (ETDEWEB)

    Yang, H.T.; Peng, P.C.; Jiang, H.L. [Chung Yuan Christian Univ., Chung Li, Taiwan (China)

    2006-07-01

    Service restoration of a substation is a stressful and immediate task that must be conducted by system operators following a blackout. Operators, including those of Taiwan Power Company (TPC), normally restore power loads on the basis of their past experiences and engineering heuristics. Due to the significant number of switching operations to be evaluated, a computer-aided decision support system can be quite valuable. In distribution system automation, installation of unmanned substations requires an automated restoration computer system to rapidly devise a switching plan after a fault event. The modeling technique of Petri Nets (PNs) encompasses fault diagnosis of distribution systems, protective scheming of relays, and generic restoration schedule of power transmission systems. Knowledge or configuration about the system concerned can be expressed systematically through a structured model with parallelism and synchronization. This paper proposed a new PNs knowledge representation scheme to achieve a fast, on-line service restoration plan of a substation. The paper described the task of service restoration in a substation as well as the heuristic rules adopted by the dispatchers of the TPC distribution systems. The paper also introduced the topic of Typical PN properties and the proposed matrix operations for PNs reasoning. The proposed basic PNs model for service restoration on the basis of the engineering heuristics were also identified. It was concluded that the proposed approach not only facilitated software programming, but was highly adaptive to the extension or maintenance of the developed programs, arising from the changes of the substation configuration. 18 refs., 1 tab., 8 figs.

  20. Baseline and Postremediation Monitoring Program Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This report was prepared in accordance with CERCLA requirements to present the plan for baseline and postremediation monitoring as part of the selected remedy. It provides the Environmental Restoration Program with information about the requirements to monitor for soil and terrestrial biota in the Lower East Fork Poplar Creek (LEFPC) floodplain; sediment, surface water, and aquatic biota in LEFPC; wetland restoration in the LEFPC floodplain; and human use of shallow groundwater wells in the LEFPC floodplain for drinking water. This document describes the monitoring program that will ensure that actions taken under Phases I and II of the LEFPC remedial action are protective of human health and the environment

  1. Evaluation of mid-to-long term basic research for environmental restoration

    International Nuclear Information System (INIS)

    1989-09-01

    This document describes a long-term basic research program for the US Department of Energy (DOE) that complements departmental initiatives in waste management and site cleanup. The most important problems faced by DOE are environmental restoration of waste sites and cleanup of inactive facilities. Environmental restoration is defined in this report as characterization, assessment, remediation, and post-closure verification within the waste/environmental system at DOE sites. Remediation of inactive, contaminated waste-disposal sites is the largest and most expensive task facing DOE. Immobilization, isolation, separation, and destruction of waste, either aboveground or in situ, are difficult and costly tasks. Technologies for these tasks are primitive or do not exist. Departmental problems in the long term are being analyzed scientifically and research needs are being identified. When completed, the Office of Energy Research's (OER's) basis research plan will describe potential scientific research needs for universities, national laboratories, and others as a basis for research proposals to DOE. Extensive interaction with the scientific community is planned to further refine and prioritize research needs. Basic research within DOE is directed toward fundamental knowledge leading to the discovery of new scientific or engineering concepts and principles that may or may not have immediate specific technological applications. However, because DOE is a mission-oriented agency, basic research in DOE is strongly influenced by national energy and environmental policy and may be multidisciplinary in nature. Basic research will provide innovative concepts and the fundamental knowledge base that facilitates the development and application of new and emerging technologies. 41 refs., 5 figs., 9 tabs

  2. Guidance document for preparing water sampling and analysis plans for UMTRA Project sites. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    A water sampling and analysis plan (WSAP) is prepared for each Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide the rationale for routine ground water sampling at disposal sites and former processing sites. The WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine ground water monitoring stations at each site. This guidance document has been prepared by the Technical Assistance Contractor (TAC) for the US Department of Energy (DOE). Its purpose is to provide a consistent technical approach for sampling and monitoring activities performed under the WSAP and to provide a consistent format for the WSAP documents. It is designed for use by the TAC in preparing WSAPs and by the DOE, US Nuclear Regulatory Commission, state and tribal agencies, other regulatory agencies, and the public in evaluating the content of WSAPS

  3. Mined Geologic Disposal System Requirements Document

    International Nuclear Information System (INIS)

    1993-01-01

    This Mined Geologic Disposal System Requirements document (MGDS-RD) describes the functions to be performed by, and the requirements for, a Mined Geologic Disposal System (MGDS) for the permanent disposal of spent nuclear fuel (SNF) and commercial and defense high level radioactive waste (HLW) in support of the Civilian Radioactive Waste Management System (CRWMS). The development and control of the MGDS-RD is quality-affecting work and is subject to the Department of Energy (DOE) Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance Requirements Document (QARD). As part of the technical requirements baseline, it is also subject to Baseline Management Plan controls. The MGDS-RD and the other program-level requirements documents have been prepared and managed in accordance with the Technical Document Preparation Plan (TDPP) for the Preparation of System Requirements Documents

  4. NASA software documentation standard software engineering program

    Science.gov (United States)

    1991-01-01

    The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.

  5. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 411. Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K. [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-03-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions

  6. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  7. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  8. The Use of Restorative Justice Practices in a School Community Traumatized by an Incident of Planned School Violence: A Case Study

    Science.gov (United States)

    Mateer, Susan Carol

    2010-01-01

    In 2001, less than two years after the Columbine High School shootings, a plan to copycat the Columbine shooting in a junior high school was interrupted by police. This was one of the first documented cases of interrupted school violence and the school where this was to occur was traumatized both by the fact that students were planning violence…

  9. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Steam Cleaning Effluent Ponds

    International Nuclear Information System (INIS)

    1996-02-01

    This plan presents the strategy for the characterization of the Area 6 South and North Steam Cleaning Effluent Ponds (SCEPs) at the Nevada Test Site (NTS) to be conducted for the US Department of Energy, Nevada Operations Office (DOE/NV), Environmental Restoration Division (ERD). The purposes of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste (IDW). The scope of the characterization may include excavation, drilling, and sampling of soil in and around both ponds; sampling of the excavated material; in situ sampling of the soil at the bottom and on the sides of the excavations as well as within subsurface borings; and conducting sample analysis for both characterization and waste management purposes. Contaminants of concern include RCRA-regulated VOCs and metals

  10. Criteria Document for B-plant's Surveillance and Maintenance Phase Safety Basis Document

    International Nuclear Information System (INIS)

    SCHWEHR, B.A.

    1999-01-01

    This document is required by the Project Hanford Managing Contractor (PHMC) procedure, HNF-PRO-705, Safety Basis Planning, Documentation, Review, and Approval. This document specifies the criteria that shall be in the B Plant surveillance and maintenance phase safety basis in order to obtain approval of the DOE-RL. This CD describes the criteria to be addressed in the S and M Phase safety basis for the deactivated Waste Fractionization Facility (B Plant) on the Hanford Site in Washington state. This criteria document describes: the document type and format that will be used for the S and M Phase safety basis, the requirements documents that will be invoked for the document development, the deactivated condition of the B Plant facility, and the scope of issues to be addressed in the S and M Phase safety basis document

  11. "Restorative Justice": History of the Term's International and Danish Use

    DEFF Research Database (Denmark)

    Gade, Christian B. N.

    2018-01-01

    In this article, I explore the historical origin and development of the use of the term “restorative justice” in published sources. The main argument is that the growing popularity of the term and its expanding use makes increasingly blurred what restorative justice is. I begin by investigating....... In the 2000s, the term began to appear in United Nations and European Union documents, illustrating that restorative justice had become an internationally recognised approach to justice. After describing this international development, I analyse the Danish context, where the term “restorative justice” began...... to appear in writings around the year 2000. Around the same time, the existing Danish victim offender mediation programme became connected to restorative justice. Later, Danish practices outside the area of criminal justice became associated with the term. In conclusion, I argue that a potential problem...

  12. Computerising documentation

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The nuclear power generation industry is faced with public concern and government pressures over safety, efficiency and risk. Operators throughout the industry are addressing these issues with the aid of a new technology - technical document management systems (TDMS). Used for strategic and tactical advantage, the systems enable users to scan, archive, retrieve, store, edit, distribute worldwide and manage the huge volume of documentation (paper drawings, CAD data and film-based information) generated in building, maintaining and ensuring safety in the UK's power plants. The power generation industry has recognized that the management and modification of operation critical information is vital to the safety and efficiency of its power plants. Regulatory pressure from the Nuclear Installations Inspectorate (NII) to operate within strict safety margins or lose Site Licences has prompted the need for accurate, up-to-data documentation. A document capture and management retrieval system provides a powerful cost-effective solution, giving rapid access to documentation in a tightly controlled environment. The computerisation of documents and plans is discussed in this article. (Author)

  13. Impact of occupational issues on DOE's environmental restoration program

    International Nuclear Information System (INIS)

    Siegel, M.R.; Lesperance, A.M.; Smith, D.

    1992-01-01

    The U.S. Department of Energy (DOE) is in the midst of a 30-yr, multi-billion-dollar environmental restoration program for most of the facilities included in its nuclear weapons complex. Long-term planning efforts are under way to identify strategies and approaches for carrying out this extraordinarily complicated task. The DOE has already entered into interagency agreements with the U.S. Environmental Protection Agency and states for many of its environmental restoration sites. These agreements set legally enforceable deadlines for cleanup activities at these sites. In addition, DOE has made other commitments to Congress and the public regarding its environmental restoration schedule. Thousands of workers will be directly involved in environmental restoration activities at DOE sites. Cleanup activity will be carried out in environments involving potential exposure to highly toxic chemical substances and radionuclides. It is inevitable that occupational safety and health (OSH) issues will become both critical and highly visible to DOE. The OSH issues associated with cleanup activities will likely attract the attention of workers, unions, the media, regulators, and the public. This paper reviews three case studies describing OSH activities in DOE's environmental restoration program. These case studies will help alert DOE officials to ways that various OSH issues should be considered when planning environmental restoration activities. This activity is being coordinated with other DOE work to identify occupational requirements that are applicable to DOE cleanup work

  14. Integration plan required by performance agreement SM 7.2.1

    International Nuclear Information System (INIS)

    Diediker, L.P.

    1997-01-01

    Fluor Daniel Hanford, Inc. and its major subcontractors are in agreement that environmental monitoring performed under the Project Hanford Management Contract is to be done in accordance with a single, integrated program. The purpose of this Integration Plan for Environmental Monitoring is to document the policies, systems, and processes being put in place to meet one key objective: manage and integrate a technically competent, multi-media ambient environmental monitoring program, in an efficient, cost effective manner. Fluor Daniel Hanford, Inc. and its major subcontractors also commit to conducting business in a manner consistent with the International Standards Organization 14000 Environmental Management System concepts. Because the integration of sitewide groundwater monitoring activities is managed by the Environmental Restoration Contractor, groundwater monitoring it is outside the scope of this document. Therefore, for the purpose of this Integration Plan for Environmental Monitoring, the Integrated Environmental Monitoring Program is defined as applicable to all environmental media except groundwater. This document provides recommendations on future activities to better integrate the overall environmental monitoring program, with emphasis on the near-field program. In addition, included is the Fluor Daniel Hanford, Inc. team review of the environmental monitoring activities on the Hanford Site, with concurrence of Pacific Northwest National Laboratory and Bechtel Hanford, Inc. (The narrative provided later in the Discussion Section describes the review and consideration given to each topic.) This document was developed to meet the requirements of the Project Hanford Management Contract performance agreement (SM7.2) and the tenets of the U.S. Department of Energy's Effluent and Environmental Monitoring Planning Process. This Plan is prepared for the U.S. Department of Energy, Richland Operations Office, Environmental Assurance, Permits, and Policy Division

  15. 76 FR 58509 - Release of Risk and Exposure Assessment Planning Document for the Review of the National Ambient...

    Science.gov (United States)

    2011-09-21

    ... Assessment Planning Document for the Review of the National Ambient Air Quality Standards for Lead AGENCY... available for public review the Review of the National Ambient Air Quality Standards for Lead: Risk and... and/or welfare effects in this review of the national ambient air quality standards (NAAQS) for lead...

  16. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  17. Restoration of the Serranos Towers in Valencia.

    Directory of Open Access Journals (Sweden)

    Camilla Mileto

    2003-12-01

    Full Text Available The recent restoration of the emblematic Serranos Towers carried out by an interdisciplinary team of specialists was an excuse to delve into the history and masonry of the towers, from their initial building and use as a prison to the restorations works practised in the 19th century and subsequent repairs. The cleaning of the walls permitted a direct study of the masonry, which provided a great deal of information that complemented the rigorous historical investigation. The maintenance scheme planned for the future is an interesting proposal, where good sense prevails over improvisation, so often a reality in the restoration of monuments today.

  18. Multimodal document management in radiotherapy

    International Nuclear Information System (INIS)

    Fahrner, H.; Kirrmann, S.; Roehner, F.; Schmucker, M.; Hall, M.; Heinemann, F.

    2013-01-01

    Background and purpose: After incorporating treatment planning and the organisational model of treatment planning in the operating schedule system (BAS, 'Betriebsablaufsystem'), complete document qualities were embedded in the digital environment. The aim of this project was to integrate all documents independent of their source (paper-bound or digital) and to make content from the BAS available in a structured manner. As many workflow steps as possible should be automated, e.g. assigning a document to a patient in the BAS. Additionally it must be guaranteed that at all times it could be traced who, when, how and from which source documents were imported into the departmental system. Furthermore work procedures should be changed that the documentation conducted either directly in the departmental system or from external systems can be incorporated digitally and paper document can be completely avoided (e.g. documents such as treatment certificate, treatment plans or documentation). It was a further aim, if possible, to automate the removal of paper documents from the departmental work flow, or even to make such paper documents superfluous. In this way patient letters for follow-up appointments should automatically generated from the BAS. Similarly patient record extracts in the form of PDF files should be enabled, e.g. for controlling purposes. Method: The available document qualities were analysed in detail by a multidisciplinary working group (BAS-AG) and after this examination and assessment of the possibility of modelling in our departmental workflow (BAS) they were transcribed into a flow diagram. The gathered specifications were implemented in a test environment by the clinical and administrative IT group of the department of radiation oncology and subsequent to a detailed analysis introduced into clinical routine. Results: The department has succeeded under the conditions of the aforementioned criteria to embed all relevant documents in the departmental

  19. Effect of the PREPARE Website vs an Easy-to-Read Advance Directive on Advance Care Planning Documentation and Engagement Among Veterans: A Randomized Clinical Trial.

    Science.gov (United States)

    Sudore, Rebecca L; Boscardin, John; Feuz, Mariko A; McMahan, Ryan D; Katen, Mary T; Barnes, Deborah E

    2017-08-01

    Documentation rates of patients' medical wishes are often low. It is unknown whether easy-to-use, patient-facing advance care planning (ACP) interventions can overcome barriers to planning in busy primary care settings. To compare the efficacy of an interactive, patient-centered ACP website (PREPARE) with an easy-to-read advance directive (AD) to increase planning documentation. This was a comparative effectiveness randomized clinical trial from April 2013 to July 2016 conducted at multiple primary care clinics at the San Francisco VA Medical Center. Inclusion criteria were age of a least 60 years; at least 2 chronic and/or serious conditions; and 2 or more primary care visits; and 2 or more additional clinic, hospital, or emergency room visits in the last year. Participants were randomized to review PREPARE plus an easy-to-read AD or the AD alone. There were no clinician and/or system-level interventions or education. Research staff were blinded for all follow-up measurements. The primary outcome was new ACP documentation (ie, legal forms and/or discussions) at 9 months. Secondary outcomes included patient-reported ACP engagement at 1 week, 3 months, and 6 months using validated surveys of behavior change process measures (ie, 5-point knowledge, self-efficacy, readiness scales) and action measures (eg, surrogate designation, using a 0-25 scale). We used intention-to-treat, mixed-effects logistic and linear regression, controlling for time, health literacy, race/ethnicity, baseline ACP, and clustering by physician. The mean (SD) age of 414 participants was 71 (8) years, 38 (9%) were women, 83 (20%) had limited literacy, and 179 (43%) were nonwhite. No participant characteristic differed significantly among study arms at baseline. Retention at 6 months was 90%. Advance care planning documentation 6 months after enrollment was higher in the PREPARE arm vs the AD-alone arm (adjusted 35% vs 25%; odds ratio, 1.61 [95% CI, 1.03-2.51]; P = .04). PREPARE also resulted

  20. CNEA's quality system documentation

    International Nuclear Information System (INIS)

    Mazzini, M.M.; Garonis, O.H.

    1998-01-01

    Full text: To obtain an effective and coherent documentation system suitable for CNEA's Quality Management Program, we decided to organize the CNEA's quality documentation with : a- Level 1. Quality manual. b- Level 2. Procedures. c-Level 3. Qualities plans. d- Level 4: Instructions. e- Level 5. Records and other documents. The objective of this work is to present a standardization of the documentation of the CNEA's quality system of facilities, laboratories, services, and R and D activities. Considering the diversity of criteria and formats for elaboration the documentation by different departments, and since ultimately each of them generally includes the same quality management policy, we proposed the elaboration of a system in order to improve the documentation, avoiding unnecessary time wasting and costs. This will aloud each sector to focus on their specific documentation. The quality manuals of the atomic centers fulfill the rule 3.6.1 of the Nuclear Regulatory Authority, and the Safety Series 50-C/SG-Q of the International Atomic Energy Agency. They are designed by groups of competent and highly trained people of different departments. The normative procedures are elaborated with the same methodology as the quality manuals. The quality plans which describe the organizational structure of working group and the appropriate documentation, will asses the quality manuals of facilities, laboratories, services, and research and development activities of atomic centers. The responsibilities for approval of the normative documentation are assigned to the management in charge of the administration of economic and human resources in order to fulfill the institutional objectives. Another improvement aimed to eliminate unnecessary invaluable processes is the inclusion of all quality system's normative documentation in the CNEA intranet. (author) [es

  1. Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill I, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    International Nuclear Information System (INIS)

    1994-03-01

    This document refers to data concerning the Environmental Restoration Program implemented at the Oak Ridge Y-12 plant. Topics discussed include: Remediation plans for the burial grounds, sanitary landfill I, oil retention ponds, S-3 ponds, and the boneyard/burnyard at Y-12. This document also contains information about the environmental policies regulating the remediation

  2. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject

  3. Physical criteria for the design and assessment of restoration schemes in the United Kingdom

    International Nuclear Information System (INIS)

    Humphries, R.N.; McQuire, G.E.

    1994-01-01

    The restoration of colliery wastes and open pit coal sites in the United Kingdom (UK) is undertaken according to a land use strategy plan and detailed specifications that have been agreed upon with the planning authorities. For two of the major land uses in the UK, agriculture and forestry, data on physical criteria (climate, site features and soils) are available to assist in the planning and design of land use strategies and specification of restoration treatments. Similar criteria could also be developed for the restoration of semi natural vegetation and habitats for landscape, wildlife, and amenity uses. Three examples are described illustrating the use of the physical criteria in the design of schemes, the specification of treatments, and the assessment of achievements

  4. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (1996 (as amended February 2008)). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (sm b ullet) CAS 01-23-02, Atmospheric Test Site - High Alt(sm b ullet) CAS 02-23-02, Contaminated Areas (2)(sm b ullet) CAS 02-23-03, Contaminated Berm(sm b ullet) CAS 02-23-10, Gourd-Amber Contamination Area(sm b ullet) CAS 02-23-11, Sappho Contamination Area(sm b ullet) CAS 02-23-12, Scuttle Contamination Area(sm b ullet) CAS 03-23-24, Seaweed B Contamination Area(sm b ullet) CAS 03-23-27, Adze Contamination Area(sm b ullet) CAS 03-23-28, Manzanas Contamination Area(sm b ullet) CAS 03-23-29, Truchas-Chamisal Contamination Area(sm b ullet) CAS 04-23-02, Atmospheric Test Site T4-a(sm b ullet) CAS 05-23-06, Atmospheric Test Site(sm b ullet) CAS 09-23-06, Mound of Contaminated Soil(sm b ullet) CAS 10-23-04, Atmospheric Test Site M-10(sm b ullet) CAS 18-23-02, U-18d Crater (Sulky) Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107.

  5. Geomorphic Function and Restoration Potential of Spring Creeks in Southeastern Idaho: Analysis and Communication

    Science.gov (United States)

    Hanrahan, T. P.; Hill, Z.; Levell, A.; Maguire, T.; Risso, D.

    2014-12-01

    A large wetland and floodplain complex adjacent to the Snake River in southeastern Idaho, USA, encompasses numerous spring-fed creeks that originate on the floodplain and discharge at their confluence with the Snake River and American Falls Reservoir. Resource managers are implementing a program to restore these spring creeks for the recovery of Yellowstone cutthroat trout and ecosystem health. Our objectives were to evaluate the physical characteristics of these spring creeks, develop a conceptual model of their geomorphic function, compare the restoration potential of individual reaches, and communicate our findings to a broad audience of resource managers and regional stakeholders in order to foster restoration planning. A geomorphic assessment along 38 km of three spring creeks was completed by collecting data at several transects within distinct geomorphic reaches, and by collecting data continuously throughout all reaches. These data were summarized in a GIS database and used to quantify the overall geomorphic functioning of each reach. The geomorphic functional scores were scaled from 0% (non-functional) to 100% (fully functional). Among all three spring creeks, geomorphic function ranged from 29% to 63%, with bank conditions and riparian vegetation being the primary causes of overall channel degradation. Results from the geomorphic assessment fostered the development of a conceptual model for spring creek function, whereby degraded bank conditions represent the primary controlling factor of decreased geomorphic function and fish habitat quality. The reach-based geomorphic functional scoring provides an indicator of relative restoration potential for each reach, and is one of the factors used in determining site-specific priorities for protecting, enhancing, and restoring spring creeks on the Fort Hall Bottoms. The study results, conceptual model and restoration strategy were communicated to resource managers and regional stakeholders through a graphically

  6. In absence of intervention. Digital representations of virtual restoration

    Directory of Open Access Journals (Sweden)

    Vincenza Garofalo Garofalo

    2015-01-01

    Full Text Available The simulation of reality through the techniques of digital representation helps restorers today as it allows them to verify the impact of a restoration even before intervening. This can help to avoid restorations too invasive and to contain erroneous practices that sometimes delete irretrievably the original traces. The paper analyzes some researches on lighting in virtual models that are emblematic of a possible approach. The digital 3D analyzed  reconstructions provide not only the spatial and dimensional information but also the chromatic aspects and the characteristics of illumination of an architecture. The development of interactive systems for documentation also allows to visualize the evolution over time of an architecture and to select hypothetical alternatives reconstructions.

  7. A novel classification and online platform for planning and documentation of medical applications of additive manufacturing.

    Science.gov (United States)

    Tuomi, Jukka; Paloheimo, Kaija-Stiina; Vehviläinen, Juho; Björkstrand, Roy; Salmi, Mika; Huotilainen, Eero; Kontio, Risto; Rouse, Stephen; Gibson, Ian; Mäkitie, Antti A

    2014-12-01

    Additive manufacturing technologies are widely used in industrial settings and now increasingly also in several areas of medicine. Various techniques and numerous types of materials are used for these applications. There is a clear need to unify and harmonize the patterns of their use worldwide. We present a 5-class system to aid planning of these applications and related scientific work as well as communication between various actors involved in this field. An online, matrix-based platform and a database were developed for planning and documentation of various solutions. This platform will help the medical community to structurally develop both research innovations and clinical applications of additive manufacturing. The online platform can be accessed through http://www.medicalam.info. © The Author(s) 2014.

  8. Tabular map of bank mining in North Czech and photo-documentation

    International Nuclear Information System (INIS)

    Svec, J.; Jenista, J.

    2003-01-01

    Quarry coal mining in North Bohemian coal territory represents actual problem that resulted in destabilisation up to devastation of land. Mining activities represent total area about 300 square kilometres. It is documented by tabular map with photo-documentation. Anthropogenic land degradation requires restoration actions in land in this range that will return its stability and natural functions

  9. Waste Acceptance System Requirements document (WASRD)

    International Nuclear Information System (INIS)

    1993-01-01

    This Waste Acceptance System Requirements document (WA-SRD) describes the functions to be performed and the technical requirements for a Waste Acceptance System for accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) into the Civilian Radioactive Waste Management System (CRWMS). This revision of the WA-SRD addresses the requirements for the acceptance of HLW. This revision has been developed as a top priority document to permit DOE's Office of Environmental Restoration and Waste Management (EM) to commence waste qualification runs at the Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) in a timely manner. Additionally, this revision of the WA-SRD includes the requirements from the Physical System Requirements -- Accept Waste document for the acceptance of SNF. A subsequent revision will fully address requirements relative to the acceptance of SNF

  10. Consideration of the restoring plan in subsidence prone areas through the development of ground stability assessment techniques

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Kwang-Soo; Kim, Im-Ho; Baek, Sang-Ho [Korea Institute of Geology Mining and Materials, Taejon (KR)] (and others)

    1999-12-01

    This report consists of 2 subjects. (1) Consideration of the restoring plan in subsidence prone areas through the development of ground stability assessment techniques : The number of mines at rest as well as closed have abruptly increased since the 1980's, which has caused subsidence problems around the mined areas. To protect such places from damage due to subsidence, it is necessary to develop the assessment techniques of ground stability and make restoration plan. To achieve this goal, the site investigation should have been conducted before the subsidence events occurred, but ground behaviors around the places where a vertical movement is expected and recognised in advance before the occurrence of the subsidence events. In this study ground stability analysis for the area surrounding the Moo-Geuk Mine, located close to a city, was conducted and the measurements were recorded. The objectives of the present study include, the development of a risk assessment technique for the subsidence using GIS tool, an evaluation of the numerical methods related to the site investigation and the ground stability analysis, the application of the numerical tools to the present problems. (2) Integration of coal mine data and use of remote sensing in investigation of coal mine area : This study attempt to integrate the previous geological and mining data to avoid confusions often occurred when accessing source data. And the investigation of underground mining place using remote sensing method is the other effort to assure the geographic locations of mining places as well as to find out unknown mining place. The sample region for examining the remote sensing method is the Chungnam coal field, which locates in the middle western part of South Korea. Detailed investigation was held on the Seongju area, locating north eastern part of the coal field. (author). 54 refs., tabs., figs.

  11. Conservative restoration of a traumatically involved central incisor.

    Science.gov (United States)

    Bassett, Joyce

    2012-04-01

    The use of a direct composite material known for excellent polishability, polish retention, and wear resistance is described in this case of a fractured central incisor restoration. The method used enabled the clinician to conserve tooth structure and maintain full control of the outcome while creating an esthetically imperceptible, reliable, and durable restoration for a young male patient. Emphasized in this case are the techniques of layering, contouring, and polishing of a nanocomposite used to maximize esthetics and meet patient expectations. To further ensure imperceptibility, the author recommends first facilitating color shade selection for both body and dentin-especially in two-shade or multiple-shade restorations-by placing the composite in its planned area of the restoration and curing it in its proper thickness to allow a preview and recipe map.

  12. Corrosive Space Gas Restores Artwork, Promises Myriad Applications

    Science.gov (United States)

    2007-01-01

    Atomic oxygen's unique characteristic of oxidizing primarily hydrogen, carbon, and hydrocarbon polymers at surface levels has been applied in the restoration of artwork, detection of document forgeries, and removal of bacterial contaminants from surgical implants. The Electro-Physics Branch at Glenn Research Center built on corrosion studies of long-duration coatings for use in space, and applied atomic oxygen's selectivity to instances where elements need to be removed from a surface. Atomic oxygen is able to remove organic compounds high in carbon (mostly soot) from fire-damaged artworks without causing a shift in the paint color. First successfully tested on oil paintings, the team then applied the restoration technique to acrylics, watercolors, and ink. The successful art restoration process was well-publicized, and soon a multinational, nonprofit professional organization dedicated to the art of forensic analysis of documents had successfully applied this process in the field of forgery detection. The gas has biomedical applications as well-Atomic Oxygen technology can be used to decontaminate orthopedic surgical hip and knee implants prior to surgery, and additional collaborative research between the Cleveland Clinic Foundation and the Glenn team shows that this gas's roughening of surfaces improves cell adhesion, which is important for the development of new drugs.

  13. Environmental Restoration and Waste Management (EM) program: An introduction

    International Nuclear Information System (INIS)

    1990-12-01

    This booklet introduces the reader to the mission and functions of a major new unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 1989, implementing a central purpose of DOE's first annual Environmental Restoration and Waste Management Five-Year Plan, which had appeared three months earlier. The contents of this booklet, and their arrangement, reflect the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: focusing DOE's activities on eliminating or reducing known or recognized potential risks to worker and public health and the environment, containing or isolating, removing, or detoxifying onsite and offsite contamination, and developing technology to achieve DOE's environmental goals

  14. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  15. Environmental Restoration Program Control Management System

    International Nuclear Information System (INIS)

    Duke, R.T.

    1992-01-01

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system

  16. Effects of oral hygiene, residual caries and cervical Marginal-gaps on the survival of proximal atraumatic restorative treatment approach restorations

    Directory of Open Access Journals (Sweden)

    Arthur M Kemoli

    2011-01-01

    Full Text Available Background: Although Atraumatic restorative treatment (ART approach has been in existence for a while, the reasons for the poor performance of multisurface ART restorations are not very clear. Aim: The aim of this study is to investigate the effects of oral hygiene, residual caries and cervical marginal-gaps on survival of proximal ART restorations. Settings: Two rural divisions in Kenya were selected for the study. Design: A randomized clinical trial. Material and Methods: The 804 children in the study had their baseline- and 2-year dental plaque levels documented. Each child received one proximal restoration in a primary molar using ART approach, together with trained and pre-tested operators/assistants, three glass ionomer cements (GIC-brands and two tooth-isolation methods. The restorations were clinically evaluated soon after placement and after 2 years. Post-restorative bite-wing radiographs taken soon after restoration were also evaluated. Statistical analysis: Statistical Package for Social Sciences (SPSS version 14 computer programme was used and results tested using Pearson′s correlation, Cox Proportional Hazards regression analysis and Multiple Logistic regression models tests. Results: At baseline and after 2 years, the mean cumulative survival and plaque index changed from 94.4% to 30.8% and 2.34 (Standard Deviation, or SD of 0.46 to 1.92 (SD 2.1 respectively, with higher plaque indices associated with higher restoration failures. Of the 507 radiographs evaluated, 48 (9.5%, 63 (12.4% and 9 (1.8% restorations had residual caries (RC, cervical marginal-gaps (CMG and both RC/CMG respectively. Survival of the restorations with RC/CMG was significantly lower (p = 0.003 compared to those with RC or without RC. Conclusion: Low survival of proximal restorations in the study was associated with the presence of cervical marginal-gaps.

  17. 12 CFR 1777.23 - Capital restoration plans.

    Science.gov (United States)

    2010-01-01

    ... under express terms of the plan itself identifying a date, event, or condition upon which such... plan that is responsive to the terms of and within the deadline specified in such notice. (b) Contents... activities (including existing and new programs) in which the Enterprise will engage during the term of the...

  18. Estimating restorable wetland water storage at landscape scales

    Science.gov (United States)

    Jones, Charles Nathan; Evenson, Grey R.; McLaughlin, Daniel L.; Vanderhoof, Melanie; Lang, Megan W.; McCarty, Greg W.; Golden, Heather E.; Lane, Charles R.; Alexander, Laurie C.

    2018-01-01

    Globally, hydrologic modifications such as ditching and subsurface drainage have significantly reduced wetland water storage capacity (i.e., volume of surface water a wetland can retain) and consequent wetland functions. While wetland area has been well documented across many landscapes and used to guide restoration efforts, few studies have directly quantified the associated wetland storage capacity. Here, we present a novel raster-based approach to quantify both contemporary and potential (i.e., restorable) storage capacities of individual depressional basins across landscapes. We demonstrate the utility of this method by applying it to the Delmarva Peninsula, a region punctuated by both depressional wetlands and drainage ditches. Across the entire peninsula, we estimated that restoration (i.e., plugging ditches) could increase storage capacity by 80%. Focusing on an individual watershed, we found that over 59% of restorable storage capacity occurs within 20 m of the drainage network, and that 93% occurs within 1 m elevation of the drainage network. Our demonstration highlights widespread ditching in this landscape, spatial patterns of both contemporary and potential storage capacities, and clear opportunities for hydrologic restoration. In Delmarva and more broadly, our novel approach can inform targeted landscape-scale conservation and restoration efforts to optimize hydrologically mediated wetland functions.

  19. Savannah River Site's Site Specific Plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  20. Recommended HSE-7 documents hierarchy

    International Nuclear Information System (INIS)

    Klein, R.B.; Jennrich, E.A.; Lund, D.M.; Danna, J.G.; Davis, K.D.; Rutz, A.C.

    1990-01-01

    This report recommends a hierarchy of waste management documents at Los Alamos National Laboratory (LANL or ''Laboratory''). The hierarchy addresses documents that are required to plan, implement, and document waste management programs at Los Alamos. These documents will enable the waste management group and the six sections contained within that group to satisfy requirements that are imposed upon them by the US Department of Energy (DOE), DOE Albuquerque Operations, US Environmental Protection Agency, various State of New Mexico agencies, and Laboratory management

  1. Wind River Watershed Restoration: 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connolly, Patrick J.

    2001-09-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its first year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey--Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW). Following categories given in the FY1999 Statement of Work, the broad categories, the related objectives, and the entities associated with each objective (lead entity in boldface) were as follows: Coordination--Objective 1: Coordinate the Wind River watershed Action Committee (AC) and Technical Advisory Committee (TAC) to develop a prioritized list of watershed enhancement projects. Monitoring--Objective 2: Monitor natural production of juvenile, smolt, and adult steelhead in the Wind River subbasin. Objective 3: Evaluate physical habitat conditions in the Wind River subbasin. Assessment--Objective 4: Assess watershed health using an ecosystem-based diagnostic model that will provide the technical basis to prioritize out-year restoration projects. Restoration--Objective 5: Reduce road related sediment sources by reducing road densities to less than 2 miles per square mile. Objective 6: Rehabilitate riparian corridors, flood plains, and channel morphology to reduce maximum water temperatures to less than 61 F, to increase bank stability to greater than 90%, to reduce bankfull width to depth ratios to less than 30, and to provide natural levels of pools and cover for fish. Objective 7: Maintain and evaluate passage for adult and juvenile steelhead at artificial barriers. Education

  2. Recovery and Restoration of Apollo Data - An Update

    Science.gov (United States)

    Williams, D. R.; Taylor, P. T.; Hills, H. K.; Nagihara, S.; Nakamura, Y.; Kiefer, W. S.; Guinness, E. A.

    2017-12-01

    The effort to restore Apollo lunar data, much of which was stored in obsolete formats and on unwieldy media, typically without sufficient documentation, continues to provide new insights into the workings of the Moon. The endeavor, under the auspices of the NASA Space Science Data Coordinated Archive (NSSDCA) Lunar Data Project and Planetary Data System (PDS) Lunar Data Node, and also funded by LASER and PDART proposals, is designed to take the data from the Apollo orbital instruments, astronaut experiments, and long-lived surface stations and convert them into well-documented, digital formats for archive in the NSSDCA and PDS. The data from the ALSEP (Apollo Lunar Surface Experiment Package) surface stations in particular had not been thoroughly examined. Now in standard digital formats with the aid of modern computers and algorithms, they are yielding long-term information on the lunar environment. We will review the data restoration effort in general, concentrating on data sets we have completed and those we are currently working on, which have resulted in advances in our understanding of the Moon. For example, we have restored the archived ALSEP heat flow data from Apollo 15 and 17 that covered the period from deployment to 1 January 1975 and archived them with PDS. In addition, raw data for a three month period from April to June, 1975 have been discovered and restored, and data from March 1976 through September 1977 have been read from the Apollo Work Tapes. These data confirm the subsurface temperatures at the heat flow site have been warming over many years, even at depth, and have implications for the interpretation of the heat flow coming from the Moon. Examination of the restored Lunar Ejecta And Meteorite (LEAM) data and comparison with the restored ALSEP Housekeeping data indicates that the anomalous signals recorded by LEAM are not due to electrical interference and may be due to charged dust particles. Re-examination of restored Lunar Atmospheric

  3. Environmental restoration baselining as a means of successful performance

    International Nuclear Information System (INIS)

    Fourr, B.R.; Pilo, M.A.; Hastings, K.R.

    1994-01-01

    The Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program is a success story for the U.S. Department of Energy Environmental Management Program (DOE-EM) with 9 Records of Decision (ROD's) signed, 5 CERCLA Interim Actions complete or in progress, 8 Expedited Removal Actions either planned, complete or in progress, and cleanup activity underway at over 60 percent of the 88 operable units. More than 50% of Idaho's budget for Fiscal Year (FY94) is targeted for cleanup activities, and starting in FY95, more than twice as much will be spent on cleanup as assessment. The INEL ER Program can serve as a model for other EM programs striving to meet the goals of the EM Strategic Plan. An important factor in the INEL success story is the work planning which takes place each year to integrate the DOE-EM budget process, the legal requirements of the Federal Facilities Agreement and Consent Order (FFA/CO), and the interests of stakeholders. This integration is no small task given that Activity Data Sheets (ADS), which are DOE-EM's primary budget document are prepared and submitted to DOE Headquarters (DOE-HQ) about 18 months prior to the start of the budget year. The ADS form the basis of budget negotiations between DOE-EM, the Office of Management and Budget (OMB) and Congress. Actual funding is not known until the start of the fiscal year

  4. Closure Plan for Active Low Level Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    SKELLY, W.A.

    2000-11-16

    This plan has been prepared in response to direction from the U.S. Department of Energy. The purpose of the plan is to define approaches that will be implemented to ensure protection of the public and the environment when active Low-Level Burial Grounds (LLBGs) at the Hanford Site are closed. Performance assessments for active burial grounds in the 200 East and West 200 Areas provide current estimates of potential environmental contamination and doses to the ''maximum exposed individual'' from burial ground operation and closure and compare dose estimates to performance objective dose limits for the facilities. This is an Operational Closure Plan. The intent of the guidance in DOE Order 435.1 is that this plan will be a living document, like the facility performance assessments, and will be revised periodically through the operational life of the LLBGs to reflect updated information on waste inventory. management practices, facility transition planning, schedule dates, assessments of post-closure performance, and environmental consequences. Out year dates identified in this plan are tentative. A Final Closure Plan will be prepared in the future when the timing and extent of closure-related activities for LLBGs can be established with greater certainty. After current operations at the LLBGs are concluded, this plan proposes transitioning of these facilities to the Environmental Restoration Program. This action will enable the Environmental Restoration Program to design and implement consistent and coordinated final remedial actions for active and inactive LLBGs. Active and inactive burial grounds in the 200 West and 200 East Areas are commingled. This plan describes approaches that will be implemented during Interim Closure, Final Closure, and Institutional Control Periods to prepare LLBGs for surface barriers, and the construction of barriers, as well as the scope of inspection, monitoring and maintenance practices that will be performed during

  5. Esthetic smile rehabilitation of anterior teeth by treatment with biomimetic restorative materials: a case report

    Directory of Open Access Journals (Sweden)

    Gouveia TH

    2017-05-01

    Full Text Available Thayla Hellen Nunes Gouveia, Jéssica Dias Theobaldo, Waldemir Francisco Vieira-Junior, Débora Alves Nunes Leite Lima, Flávio Henrique Baggio Aguiar Department of Restorative Dentistry, Piracicaba Dental School, University of Campinas, Campinas, SP, Brazil Background: In daily clinical practice, esthetics of anterior teeth is a common presenting complaint of patients.Objective: This case report discusses the management of asymmetric smile associated with unsatisfactory extensive composite restorations and describes a clinical protocol using the direct composite resin for smile enhancement to restore the dental harmony of anterior teeth.Methods: The treatment planning was based on a diagnostic wax-up and cosmetic mock-up. After clinical and patient approvals were obtained, the patient was subjected to direct and indirect restorative treatment.Conclusion: Nanocomposites are an effective alternative for anterior teeth restorations. Additionally, good planning enables satisfactory esthetic results, leading to the correction of an inappropriate axial inclination of incisors. Keywords: composite, adhesive, smile, esthetic, restoration

  6. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    International Nuclear Information System (INIS)

    Garrison, R.C.

    1995-01-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ''Tank Waste Remediation System (TWRS) Project Documentation Methodology,'' 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms' instrumentation, ventilation, electrical distribution, and waste transfer systems

  7. 340 waste handling complex: Deactivation project management plan

    International Nuclear Information System (INIS)

    Stordeur, R.T.

    1998-01-01

    This document provides an overview of the strategy for deactivating the 340 Waste Handling Complex within Hanford's 300 Area. The plan covers the period from the pending September 30, 1998 cessation of voluntary radioactive liquid waste (RLW) transfers to the 340 Complex, until such time that those portions of the 340 Complex that remain active beyond September 30, 1998, specifically, the Retention Process Sewer (RPS), can also be shut down and deactivated. Specific activities are detailed and divided into two phases. Phase 1 ends in 2001 after the core RLW systems have been deactivated. Phase 2 covers the subsequent interim surveillance of deactivated and stand-by components during the period of continued RPS operation, through the final transfer of the entire 340 Complex to the Environmental Restoration Contractor. One of several possible scenarios was postulated and developed as a budget and schedule planning case

  8. Environmental Restoration and Waste Management (EM) program: An introduction

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This booklet introduces the reader to the mission and functions of a major new unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 1989, implementing a central purpose of DOE's first annual Environmental Restoration and Waste Management Five-Year Plan, which had appeared three months earlier. The contents of this booklet, and their arrangement, reflect the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: focusing DOE's activities on eliminating or reducing known or recognized potential risks to worker and public health and the environment, containing or isolating, removing, or detoxifying onsite and offsite contamination, and developing technology to achieve DOE's environmental goals.

  9. Soil Sampling Plan for the transuranic storage area soil overburden and final report: Soil overburden sampling at the RWMC transuranic storage area

    International Nuclear Information System (INIS)

    Stanisich, S.N.

    1994-12-01

    This Soil Sampling Plan (SSP) has been developed to provide detailed procedural guidance for field sampling and chemical and radionuclide analysis of selected areas of soil covering waste stored at the Transuranic Storage Area (TSA) at the Idaho National Engineering Laboratory's (INEL) Radioactive Waste Management Complex (RWMC). The format and content of this SSP represents a complimentary hybrid of INEL Waste Management--Environmental Restoration Program, and Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation/Feasibility Study (RI/FS) sampling guidance documentation. This sampling plan also functions as a Quality Assurance Project Plan (QAPP). The QAPP as a controlling mechanism during sampling to ensure that all data collected are valid, reliabile, and defensible. This document outlines organization, objectives and quality assurance/quality control (QA/QC) activities to achieve the desired data quality goals. The QA/QC requirements for this project are outlined in the Data Collection Quality Assurance Plan (DCQAP) for the Buried Waste Program. The DCQAP is a program plan and does not outline the site specific requirements for the scope of work covered by this SSP

  10. The Role of Tidal Marsh Restoration in Fish Management in the San Francisco Estuary

    Directory of Open Access Journals (Sweden)

    Bruce Herbold

    2014-03-01

    Full Text Available   Tidal marsh restoration is an important management issue in the San Francisco Estuary (estuary. Restoration of large areas of tidal marsh is ongoing or planned in the lower estuary (up to 6,000 ha, Callaway et al. 2011. Large areas are proposed for restoration in the upper estuary under the Endangered Species Act biological opinions (3,237 ha and the Bay Delta Conservation Plan (26,305 ha. In the lower estuary, tidal marsh has proven its value to a wide array of species that live within it (Palaima 2012. In the Sacramento–San Joaquin Delta (Delta, one important function ascribed to restoration of freshwater tidal marshes is that they make large contributions to the food web of fish in open waters (BDCP 2013. The Ecosystem Restoration Program ascribed a suite of ecological functions to tidal marsh restoration, including habitat and food web benefits to native fish (CDFW 2010. This background was the basis for a symposium, Tidal Marshes and Native Fishes in the Delta: Will Restoration Make a Difference? held at the University of California, Davis, on June 10, 2013. This paper summarizes conclusions the authors drew from the symposium. 

  11. The effect of topsoil removal in restored heathland on soil fauna, topsoil microstructure, and cellulose decomposition: implications for ecosystem restoration

    Czech Academy of Sciences Publication Activity Database

    Frouz, Jan; van Diggelen, R.; Pižl, Václav; Starý, Josef; Háněl, Ladislav; Tajovský, Karel; Kalčík, Jiří

    2009-01-01

    Roč. 18, č. 14 (2009), s. 3963-3978 ISSN 0960-3115 Institutional research plan: CEZ:AV0Z60660521 Keywords : restoration * soil formation * oribatid mites Subject RIV: EH - Ecology, Behaviour Impact factor: 2.066, year: 2009

  12. Predicting wading bird and aquatic faunal responses to ecosystem restoration scenarios

    Science.gov (United States)

    Beerens, James M.; Trexler, Joel C.; Catano, Christopher P.

    2017-01-01

    In large-scale conservation decisions, scenario planning identifies key uncertainties of ecosystem function linked to ecological drivers affected by management, incorporates ecological feedbacks, and scales up to answer questions robust to alternative futures. Wetland restoration planning requires an understanding of how proposed changes in surface hydrology, water storage, and landscape connectivity affect aquatic animal composition, productivity, and food-web function. In the Florida Everglades, reintroduction of historical hydrologic patterns is expected to increase productivity of all trophic levels. Highly mobile indicator species such as wading birds integrate secondary productivity from aquatic prey (small fishes and crayfish) over the landscape. To evaluate how fish, crayfish, and wading birds may respond to alternative hydrologic restoration plans, we compared predicted small fish density, crayfish density and biomass, and wading bird occurrence for existing conditions to four restoration scenarios that varied water storage and removal of levees and canals (i.e. decompartmentalization). Densities of small fish and occurrence of wading birds are predicted to increase throughout most of the Everglades under all restoration options because of increased flows and connectivity. Full decompartmentalization goes furthest toward recreating hypothesized historical patterns of fish density by draining excess water ponded by levees and hydrating areas that are currently drier than in the past. In contrast, crayfish density declined and species composition shifted under all restoration options because of lengthened hydroperiods (i.e. time of inundation). Under full decompartmentalization, the distribution of increased prey available for wading birds shifted south, closer to historical locations of nesting activity in Everglades National Park.

  13. Radiological monitoring plan for the Oak Ridge Y-12 Plant: Surface Water

    International Nuclear Information System (INIS)

    1997-10-01

    The Y-12 Plant conducts a surface water monitoring program in response to DOE Orders and state of Tennessee requirements under the National Pollutant Discharge Elimination System (NPDES). The anticipated codification of DOE Order 5400.5 for radiation protection of the public and the environment (10 CFR Part 834) will require an environmental radiation protection plan (ERPP). The NPDES permit issued by the state of Tennessee requires a radiological monitoring plan (RMP) for Y-12 Plant surface waters. In a May 4, 1995 memo, the state of Tennessee, Division of Water Pollution Control, stated their desired needs and goals regarding the content of RMPs, associated documentation, and data resulting from the RMPs required under the NPDES permitting system (L. Bunting, General Discussion, Radiological Monitoring Plans, Tennessee Division of Water Pollution Control, May 4,1995). Appendix A provides an overview of how the Y-12 Plant will begin to address these needs and goals. It provides a more complete, documented basis for the current Y-12 Plant surface water monitoring program and is intended to supplement documentation provided in the Annual Site Environmental Reports (ASERs), NPDES reports, Groundwater Quality Assessment Reports, and studies conducted under the Y-12 Plant Environmental Restoration (ER) Program. The purpose of this update to the Y-12 Plant RMP is to satisfy the requirements of the current NPDES permit, DOE Order 5400.5, and 10 CFR Part 834, as current proposed, by defining the radiological monitoring plan for surface water for the Y-12 Plant. This plan includes initial storm water monitoring and data analysis. Related activities such as sanitary sewer and sediment monitoring are also summarized. The plan discusses monitoring goals necessary to determine background concentrations of radionuclides, to quantify releases, determine trends, satisfy regulatory requirements, support consequence assessments, and meet requirements that releases be ''as low as

  14. Strategies for environmental restoration in an evolving regulatory environment

    International Nuclear Information System (INIS)

    Keller, J.F.; Geffen, C.A.

    1990-03-01

    The US Department of Energy (DOE) is faced with the immense challenge of effectively implementing a program to mitigate and manage the environmental impacts created by past and current operations at its facilities. Such a program must be developed and administered in accordance with the Comprehensive Environmental Response, Compensation and Liability Act and the Resource Conservation and Recovery Act. These regulations are extremely complex, burdening the environmental restoration process with a number of planning and public interaction requirements that must be met before remediation of a site may begin. Existing regulatory and institutional requirements for environmental restoration dictate that extensive planning, characterization and assessment activities be conducted. An important part of the process is the involvement of regulators and the public in the site characterization and assessment activities and in developing reasonable solutions for cleanup. This paper identifies the regulatory requirements and highlights implementation strategies for key aspects of the environmental restoration process for DOE. Trends in legislation and policy relevant to the DOE environmental restoration process are highlighted, with strategies identified for dealing with the evolution of the regulations while maintaining continuity in the technical activities required for cleaning up the DOE hazardous and mixed waste sites. 10 refs

  15. Economics in Criticality and Restoration of Energy Infrastructures.

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Gale A.; Flaim, Silvio J.; Folga, Stephen M.; Gotham, Douglas J.; McLamore, Michael R.; Novak, Mary H.; Roop, Joe M.; Rossmann, Charles G.; Shamsuddin, Shabbir A.; Zeichner, Lee M.; Stamber, Kevin L.

    2005-03-01

    Economists, systems analysts, engineers, regulatory specialists, and other experts were assembled from academia, the national laboratories, and the energy industry to discuss present restoration practices (many have already been defined to the level of operational protocols) in the sectors of the energy infrastructure as well as other infrastructures, to identify whether economics, a discipline concerned with the allocation of scarce resources, is explicitly or implicitly a part of restoration strategies, and if there are novel economic techniques and solution methods that could be used help encourage the restoration of energy services more quickly than present practices or to restore service more efficiently from an economic perspective. AcknowledgementsDevelopment of this work into a coherent product with a useful message has occurred thanks to the thoughtful support of several individuals:Kenneth Friedman, Department of Energy, Office of Energy Assurance, provided the impetus for the work, as well as several suggestions and reminders of direction along the way. Funding from DOE/OEA was critical to the completion of this effort.Arnold Baker, Chief Economist, Sandia National Laboratories, and James Peerenboom, Director, Infrastructure Assurance Center, Argonne National Laboratory, provided valuable contacts that helped to populate the authoring team with the proper mix of economists, engineers, and systems and regulatory specialists to meet the objectives of the work.Several individuals provided valuable review of the document at various stages of completion, and provided suggestions that were valuable to the editing process. This list of reviewers includes Jeffrey Roark, Economist, Tennessee Valley Authority; James R. Dalrymple, Manager of Transmission System Services and Transmission/Power Supply, Tennessee Valley Authority; William Mampre, Vice President, EN Engineering; Kevin Degenstein, EN Engineering; and Patrick Wilgang, Department of Energy, Office of

  16. 7 CFR 625.13 - Modification of the HFRP restoration plan.

    Science.gov (United States)

    2010-01-01

    ... the easement, restoration agreement, or Landowner Protections. NRCS may obtain and receive input from the landowner and coordination from FWS and NMFS to determine whether a modification is justified. Any...-share agreement, or Landowner Protections will require agreement from the landowner, FWS or NMFS, as...

  17. Double Tracks revegetation and monitoring plan

    International Nuclear Information System (INIS)

    1997-07-01

    This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim clean-up of radionuclide-contaminated surface soil at the Double Tracks site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the site in the fall of 1994 to evaluate the performance of several native species and to evaluate different irrigation strategies. Results of the study at Double Tracks, as well as the results from numerous studies conducted at other sites (Area 11 and Area 19 of the Nevada Test Site), have been summarized and incorporated into this final reclamation plan for the interim cleanup of the Double Tracks site, located northwest of the Nevada Test Site on the Nellis Air Force Range. Surface soils at Double Tracks were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. The total amount of Pu deposited on the site was between 980 and 1,600 grams and was scattered downwind south of the detonation site. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation

  18. Meeting the Science Needs of the Nation in the Wake of Hurricane Sandy-- A U.S. Geological Survey Science Plan for Support of Restoration and Recovery

    Science.gov (United States)

    Buxton, Herbert T.; Andersen, Matthew E.; Focazio, Michael J.; Haines, John W.; Hainly, Robert A.; Hippe, Daniel J.; Sugarbaker, Larry J.

    2013-01-01

    n late October 2012, Hurricane Sandy came ashore during a spring high tide on the New Jersey coastline, delivering hurricane-force winds, storm tides exceeding 19 feet, driving rain, and plummeting temperatures. Hurricane Sandy resulted in 72 direct fatalities in the mid-Atlantic and northeastern United States, and widespread and substantial physical, environmental, ecological, social, and economic impacts estimated at near $50 billion. Before the landfall of Hurricane Sandy, the USGS provided forecasts of potential coastal change; collected oblique aerial photography of pre-storm coastal morphology; deployed storm-surge sensors, rapid-deployment streamgages, wave sensors, and barometric pressure sensors; conducted Light Detection And Ranging (lidar) aerial topographic surveys of coastal areas; and issued a landslide alert for landslide prone areas. During the storm, Tidal Telemetry Networks provided real-time water-level information along the coast. Long-term network and rapid-deployment real-time streamgages and water-quality monitors reported on river levels and changes in water quality. Immediately after the storm, the USGS serviced real-time instrumentation, retrieved data from over 140 storm-surge sensors, and collected other essential environmental data, including more than 830 high-water marks mapping the extent and elevation of the storm surge. Post-storm lidar surveys documented storm impacts to coastal barriers informing response and recovery and providing a new baseline to assess vulnerability of the reconfigured coast. The USGS Hazard Data Distribution System served storm related information from many agencies on the Internet on a daily basis. This science plan was developed immediately following Hurricane Sandy to coordinate continuing USGS activities with other agencies and to guide continued data collection and analysis to ensure support for recovery and restoration efforts. The data, information, and tools that are produced by implementing this

  19. Restoration of Traditional Korean Nuruk and Analysis of the Brewing Characteristics.

    Science.gov (United States)

    Lee, Jang-Eun; Lee, Ae Ran; Kim, HyeRyun; Lee, Eunjung; Kim, Tae Wan; Shin, Woo Chang; Kim, Jae Ho

    2017-05-28

    In this study, a total of 58 different kinds of nuruk (a traditional Korean fermentation starter) were prepared, including 46 kinds of restored nuruk from ancient documents. Each nuruk was evaluated by analysis of its saccharification power, and the enzyme activities of glucoamylase, α-amylase, β-amylase, protease, and β-glucanase. The range of saccharification power (sp) of the restored nuruk ranged between 85 and 565 sp. The diastatic enzymes, α-amylase, β-amylase, and glucoamylase, were significantly correlated to the saccharification power value; conversely, β-glucanase and protease did not have a correlative relationship with saccarification power. In addition, their brewing properties on chemical and organoleptic aspects of traditional alcoholic beverage production were compared. Each raw and supplementary material contained in nuruk showed its own unique characteristics on Korean alcoholic beverage brewing. For the first time, in this study, the traditional Korean nuruk types mentioned in ancient documents were restored using modernized production methods, and also characterized based on their brewing properties. Our results could be utilized as a basis for further study of traditional alcoholic beverages and their valuable microorganisms.

  20. Documenting Architectural Heritage in Bahia, Brazil, Using Spherical Photogrammetry

    Science.gov (United States)

    De Amorim, A. L.; Fangi, G.; Malinverni, E. S.

    2013-07-01

    The Cultural Heritage disappears at a rate higher than we are able, not only, to restore but also to document: human and natural factors, negligence or worst, deliberate demolitions put in danger the collective Architectural Heritage (AH). According to CIPA statements, the recording is important and has to follow some guidelines. The Architectural and Urban Heritage data have to be historically related, critically assessed and analyzed, before to be organized according to a thematic structure and become available for further uses. This paper shows the experiences developed by the Laboratory of Computer Graphics applied to Architecture and Design (LCAD), at the Architecture School of the Federal University of Bahia (FAUFBA), Brazil, in cooperation with the Università Politecnica delle Marche (UNIVPM, DICEA Department), Italy, in documenting architectural heritage. The research set up now has been carried out in the historical sites of Bahia, as Pelourinho neighborhood, a World Heritage by UNESCO. Other historical sites are in the plan of this survey, like the cities of Lençóis and Mucugê in Chapada Diamantina region. The aim is to build a technological platform based on low cost digital technologies and open source tools, such as Panoramic Spherical Photogrammetry, Spatial Database, Geographic Information Systems, Three-dimensional Geometric Modeling, CAD technology, for the collection, validation and dissemination of AH.

  1. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  2. Making project documentation a positive tool for management

    International Nuclear Information System (INIS)

    Shirley, C.G.

    1986-01-01

    Sandia National Laboratories is constructing Particle Beam Fusion Accelerator II, a research facility built as a major project of the U.S. Department of Energy and theoretically capable of controlled nuclear fusion. To manage technical development, the project team has evolved a documentation system with both conventional and unconventional elements. Project documentation is functional because it is usable and authoritative. Usability results from layering by audience and purpose, appropriate sequence and format, accessibility, directness, and currency. Authority results from comprehensiveness, document control, insistence on written requirements, and consistency in applying procedures. As basic communication models illustrate, every document needs a producer, a recipient, a subject, and a feedback path. Managers can promote functional documentation by planning for feedback, using fulltime documentors wisely, setting priorities, planning for effective data collection, and treating documentation as a subproject

  3. Urban forest restoration cost modeling: a Seattle natural areas case study

    Science.gov (United States)

    Jean M. Daniels; Weston Brinkley; Michael D. Paruszkiewicz

    2016-01-01

    Cities have become more committed to ecological restoration and management activities in urban natural areas. Data about costs are needed for better planning and reporting. The objective of this study is to estimate the costs for restoration activities in urban parks and green space in Seattle, Washington. Stewardship activity data were generated from a new database...

  4. Geomorphic Approach to Regional Sediment Management in Engineered and Restored Fluvial Systems

    National Research Council Canada - National Science Library

    Thorne, Colin

    2001-01-01

    This document reviews contemporary practice in regional sediment management. It examines whether catchment wide sediment issues have been considered in the design of engineering and restoration/rehabilitation projects...

  5. Public support for river restoration. A mixed-method study into local residents' support for and framing of river management and ecological restoration in the Dutch floodplains.

    Science.gov (United States)

    Buijs, Arjen E

    2009-06-01

    In many European countries, accommodating water has become the dominant paradigm in river management. In the Netherlands, extensive river restoration projects are being implemented, many of which draw serious opposition from the public. To investigate the causes of such opposition, a comprehensive study of public attitudes towards river restoration was conducted in three floodplains, both before and after river restoration. The study combined quantitative questionnaires (N=562) with open interviews (N=29). This paper describes how local residents perceive the effects of river restoration on landscape quality and how residents and protest groups use landscape quality in combination with other arguments to strategically frame river management policies. Results show that measurement of the perceived outcomes of nature restoration needs to be complemented by a more dynamic type of research, focusing on the social processes of the framing of restoration plans. Theoretically, the paper aims to contribute to the development of a rigorous research strategy to study framing processes in environmental management, using a mixed-methods approach. In general, local residents are supportive of river restoration projects. Although restoration may diminish feelings of attachment to an area, for most people this negative effect is compensated by the positive effects on scenic beauty and perceived protection from flooding. However, these positive effects may become contested because of the active framing of river restoration by protest groups. Residents use three distinct frames to give meaning to river restoration projects: (i) an attachment frame, focusing on cultural heritage and place attachment (ii) an attractive nature frame, focusing on nature as attractive living space and the intrinsic value of nature (iii) a rurality frame, focusing on rural values, agriculture and cultural heritage. Resistance to river restoration plans stems from the attachment and rurality frames

  6. Ecological and social dimensions of ecosystem restoration in the Nordic countries

    DEFF Research Database (Denmark)

    Hagen, Dagmar; Svavarsdottir, Kristin; Nilsson, Christer

    2013-01-01

    An international overview of the extent and type of ecological restoration can offer new perspectives for understanding, planning, and implementation. The Nordic countries, with a great range of natural conditions but historically similar social and political structures, provide an opportunity...... and among countries, both in the Nordic countries and internationally. An obvious advantage of such cooperation is that a wider range of experiences from different habitats and different socio-economic conditions becomes available and thus provides a more solid basis for developing practical solutions...... to compare restoration approaches and efforts across borders. The aim of this study was to explore variation in ecological restoration using the Nordic countries as an example. We used recent national assessments and expert evaluations of ecological restoration. Restoration efforts differed among countries...

  7. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs.

  8. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    International Nuclear Information System (INIS)

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs

  9. Reconstruction and restoration of historical buildings of transport infrastructure

    Science.gov (United States)

    Kareeva, Daria; Glazkova, Valeriya

    2017-10-01

    The aim of this article is to identify the main problems in the restoration of the historical objects. For this reason, it is rationally to collect and analyze the existing world experience of restoration. The information which was put together showed that there are some problems which are common and can be solved. In addition, the protection of the Monuments of Culture and Architecture Comittees always makes the restoration and reconstruction of the historical buildings complicated. By the examples of Germany, Italy and Russia it is shown that there are problems in organization, economy, planning and control. Engineers should think of and justify the methodology of organizing and monitoring of the restoration of the historical buildings. As a second solution, it will be possible to minimize time and financial costs through a favorable financial and legal background for investors and through the creation of a system of restoration work organizing. And for a faster process of restoration the imitation programs should be optimized for research and selection of the reconstruction technological and economic methods.

  10. Model-Based Evaluation of Urban River Restoration: Conflicts between Sensitive Fish Species and Recreational Users

    Directory of Open Access Journals (Sweden)

    Aude Zingraff-Hamed

    2018-05-01

    Full Text Available Urban rivers are socioecological systems, and restored habitats may be attractive to both sensitive species and recreationists. Understanding the potential conflicts between ecological and recreational values is a critical issue for the development of a sustainable river-management plan. Habitat models are very promising tools for the ecological evaluation of river restoration projects that are already concluded, ongoing, or even to be planned. With our paper, we make a first attempt at integrating recreational user pressure into habitat modeling. The objective of this study was to analyze whether human impact is likely to hinder the re-establishment of a target species despite the successful restoration of physical habitat structures in the case of the restoration of the Isar River in Munich (Germany and the target fish species Chondostroma nasus L. Our analysis combined high-resolution 2D hydrodynamic modeling with mapping of recreational pressure and used an expert-based procedure for modeling habitat suitability. The results are twofold: (1 the restored river contains suitable physical habitats for population conservation but has low suitability for recruitment; (2 densely used areas match highly suitable habitats for C. nasus. In the future, the integrated modeling procedure presented here may allow ecological refuge for sensitive target species to be included in the design of restoration and may help in the development of visitor-management plans to safeguard biodiversity and recreational ecosystem services.

  11. Environmental Restoration and Waste Management (EM) program: An introduction

    International Nuclear Information System (INIS)

    1991-06-01

    This booklet introduces the reader to the mission and functions of a major unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 198, implementing the first step in fulfilling the central purpose of DOE's annually updated Environmental Restoration and Waste Management Five-Year Plan (FYP). The first FYP had been developed three months earlier. The contents of this booklet, and their arrangement, reflect (and will, it is hoped, serve as a kind of appetizer for) the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: (1) focusing DOE's activities on eliminating or reducing known or recognized potential risks to workers, the public, and the environment; (2) containing or isolating, removing, or detoxifying onsite and offsite contamination; and (3) developing technology to achieve DOE's environmental goals. 101 refs

  12. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  13. Digital Documentation of Frank Lloyd Wright's Masterpiece, Fallingwater

    Science.gov (United States)

    Jerome, P.; Emilio, D.

    2017-08-01

    Since 1988, the professional staff of Architectural Preservation Studio (APS) has been involved with the conservation of Frank Lloyd Wright's Fallingwater in Mill Run, PA. Designed and erected from 1935 to 1939 as a weekend home for the Kauffman family, the complex consists of the main house and guest house. After five years of reports and prototype repairs, we produced a two-volume master plan. Using original Frank Lloyd Wright drawings from Avery Library as background drawings, we measured every surface and reproduced the drawings in CAD, also developing elevations of every room. Stone-by-stone drawings of every flagstone floor and terrace scheduled to be lifted were also created using overlapping film photography that was assembled into a photo mosaic. By 2005, we designed, administered and completed a four-phase exterior restoration, with the paint-stripping and repainting of interior rooms being performed during the brief winter period when the building is closed to the public on an ongoing basis. In 2016, we were invited back to the site to review conditions and advise on routine maintenance. At that time we proposed to re-document the buildings, this time using laser-scanning. Laser-scanning of the exterior was performed in May of 2016, and of the interior in March 2017, each over the course of four days. This paper will make a comparison between manual and digital techniques in terms of Fallingwater's documentation.

  14. Integrating ecological restoration into CDM forestry projects

    International Nuclear Information System (INIS)

    Ma, Maohua; Haapanen, Toni; Singh, Ram Babu; Hietala, Reija

    2014-01-01

    Highlights: • Concerns and issues in sustainability of CDM forestry projects are reviewed. • Ecological restoration is suggested to be integrated in the CDM framework. • As an ecosystem supporting service, soil restoration on degraded land is of primary importance. • Regenerating forests naturally rather than through monoculture plantations is suggested. • Potential social impacts of ecological restoration are discussed. - Abstract: The Clean Development Mechanism (CDM) is proposed to reduce greenhouse gas emissions and promote sustainable development. CDM forestry projects should contribute to mitigation of climate change through afforestation and reforestation (A/R) activities on degraded land in developing countries. However, like other types of CDM projects, the forestry projects have encountered a number of concerns and critiques. Appropriate approaches and concrete aims to achieve long-term sustainability have been lacking, and reforms have therefore been called for. The aims of this paper are to examine the published information relevant to these concerns, and frame appropriate approaches for a more sustainable CDM. In this review, as a first step to tackle some of these issues, ecological restoration is suggested for integration into the CDM framework. Essentially, this involves the restoration of ecosystem supporting service (soil restoration), upon which forests regenerate naturally rather than establishing monoculture plantations. In this way, forestry projects would bring cost-effective opportunities for multiple ecosystem services. Potential approaches, necessary additions to the monitoring plans, and social impacts of ecological restoration in CDM projects are discussed

  15. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  16. ENDODONTIC TREATMENT AND POST-CORE RESTORATION

    Directory of Open Access Journals (Sweden)

    Evi Hafifah

    2006-04-01

    Full Text Available Endodontic root canal treatment is to maintain the tooth as long as possible in the arch’s width in a good functional status. In order to reach that goal, all irritation to the pulp should be eliminated so that the tooth has a healthy periodontal tissue support. A female patient, aged 37 years, came for her upper front tooth which had been restored with a pin crown a year ago. One month ago she had a swelling accompanied with throbbing pain. There was no history of general diseases and her oral hygiene was good. Clinically 11 was restored with a pin crown and the radiographic picture showed a narrow pulp chamber, normal roots with normal canals, thickened periodontium, broken laminar dura, and diffuse periapical rarefaction. The tooth was diagnosed with pulpal necrosis. A conventional root canal treatment was performed followed by the insertion of a post core crown. The result showed a satisfactory treatment plan, a good restoration, successful treatment in this case was due to the role of the dentist to create healthy soft and hard tissues in the oral cavity before restoration, and also due to patient cooperation.

  17. Oral environment control before restorative treatment

    Directory of Open Access Journals (Sweden)

    Ian Matos Vieira

    2008-01-01

    Full Text Available The aim of the present study was to describe caries disease treatment, by means of a clinical case report, with a view to promoting the patient’s health before definitive restorative treatments, considering that treatment should include changes in the patient’s dietary and hygiene habits, and not be restricted only to restoring lesions, as well as the establishment of an individualized treatment plan for each patient. Iodine-based antimicrobial solution was applied, instructions about oral hygiene and dietary habit changes were provided. The stepwise excavation technique was performed in tooth 15, mass excavation followed by the application of glass ionomer cement in the other teeth that presented carious lesions. White stain lesions were remineralized, and cicatrizes and fissures in the posterior teeth were sealed. After health was reestablished, the temporary restorations were replaced by definitive restorations. Changes in the treatment philosophy of caries disease, based on changes in the patient’s habits and removal of foci of infection have been presented with the object of producing an effective change in this paradigm, in order to increase the longevity of teeth with less operative intervention.

  18. Peatland restoration in Canada by the sphagnum moss layer transfer method

    Energy Technology Data Exchange (ETDEWEB)

    Rochefort, L.; Boismenu, C. [Laval Univ., Quebec City, PQ (Canada). Dept. de Phytologie, Peatland Ecology and Research Group; Quinty, F. [SNC-Lavalin, Montreal, PQ (Canada)

    2009-04-01

    This article described a peatland restoration approach that has received international recognition for restoring the ecological functions of cutover sphagnum dominated peatlands. The Peatland Ecology Research Group (PERG) conducted a long-term study at the Bois-des-Bel (BDB) peatland site in Quebec to restore plant composition to a peat accumulating ecosystem. The sphagnum moss layer transfer restoration method includes 5 obligatory steps and one optional. These include planning; surface preparation; plant collection and spreading; straw mulch spreading; blocking drainage ditches; and fertilization if needed. Variable moisture conditions throughout the restoration site contribute to the spatial variability in the development of the sphagnum layer. The site has been monitored each year since its restoration. sphagnum cover reached 60 per cent in the restored zone in 2005, a value close to the range of sphagnum cover found in natural sites. In addition, a new moss layer has developed with an average of 25 cm in thickness. 27 refs., 4 figs.

  19. Joint analysis of stressors and ecosystem services to enhance restoration effectiveness.

    Science.gov (United States)

    Allan, J David; McIntyre, Peter B; Smith, Sigrid D P; Halpern, Benjamin S; Boyer, Gregory L; Buchsbaum, Andy; Burton, G A; Campbell, Linda M; Chadderton, W Lindsay; Ciborowski, Jan J H; Doran, Patrick J; Eder, Tim; Infante, Dana M; Johnson, Lucinda B; Joseph, Christine A; Marino, Adrienne L; Prusevich, Alexander; Read, Jennifer G; Rose, Joan B; Rutherford, Edward S; Sowa, Scott P; Steinman, Alan D

    2013-01-02

    With increasing pressure placed on natural systems by growing human populations, both scientists and resource managers need a better understanding of the relationships between cumulative stress from human activities and valued ecosystem services. Societies often seek to mitigate threats to these services through large-scale, costly restoration projects, such as the over one billion dollar Great Lakes Restoration Initiative currently underway. To help inform these efforts, we merged high-resolution spatial analyses of environmental stressors with mapping of ecosystem services for all five Great Lakes. Cumulative ecosystem stress is highest in near-shore habitats, but also extends offshore in Lakes Erie, Ontario, and Michigan. Variation in cumulative stress is driven largely by spatial concordance among multiple stressors, indicating the importance of considering all stressors when planning restoration activities. In addition, highly stressed areas reflect numerous different combinations of stressors rather than a single suite of problems, suggesting that a detailed understanding of the stressors needing alleviation could improve restoration planning. We also find that many important areas for fisheries and recreation are subject to high stress, indicating that ecosystem degradation could be threatening key services. Current restoration efforts have targeted high-stress sites almost exclusively, but generally without knowledge of the full range of stressors affecting these locations or differences among sites in service provisioning. Our results demonstrate that joint spatial analysis of stressors and ecosystem services can provide a critical foundation for maximizing social and ecological benefits from restoration investments.

  20. Transforming Ecosystems: When, Where, and How to Restore Contaminated Sites

    Science.gov (United States)

    Rohr, Jason R; Farag, Aïda M; Cadotte, Marc W; Clements, William H; Smith, James R; Ulrich, Cheryl P; Woods, Richard

    2016-01-01

    Chemical contamination has impaired ecosystems, reducing biodiversity and the provisioning of functions and services. This has spurred a movement to restore contaminated ecosystems and develop and implement national and international regulations that require it. Nevertheless, ecological restoration remains a young and rapidly growing discipline and its intersection with toxicology is even more nascent and underdeveloped. Consequently, we provide guidance to scientists and practitioners on when, where, and how to restore contaminated ecosystems. Although restoration has many benefits, it also can be expensive, and in many cases systems can recover without human intervention. Hence, the first question we address is: “When should we restore contaminated ecosystems?” Second, we provide suggestions on what to restore—biodiversity, functions, services, all 3, or something else—and where to restore given expected changes to habitats driven by global climate change. Finally, we provide guidance on how to restore contaminated ecosystems. To do this, we analyze critical aspects of the literature dealing with the ecology of restoring contaminated ecosystems. Additionally, we review approaches for translating the science of restoration to on-the-ground actions, which includes discussions of market incentives and the finances of restoration, stakeholder outreach and governance models for ecosystem restoration, and working with contractors to implement restoration plans. By explicitly considering the mechanisms and strategies that maximize the success of the restoration of contaminated sites, we hope that our synthesis serves to increase and improve collaborations between restoration ecologists and ecotoxicologists and set a roadmap for the restoration of contaminated ecosystems. PMID:26033665

  1. Environmental resource document for the Idaho National Engineering Laboratory. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Irving, J.S.

    1993-07-01

    This document contains information related to the environmental characterization of the Idaho National Engineering Laboratory (INEL). The INEL is a major US Department of Energy facility in southeastern Idaho dedicated to nuclear research, waste management, environmental restoration, and other activities related to the development of technology. Environmental information covered in this document includes land, air, water, and ecological resources; socioeconomic characteristics and land use; and cultural, aesthetic, and scenic resources.

  2. Environmental resource document for the Idaho National Engineering Laboratory. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Irving, J.S.

    1993-07-01

    This document contains information related to the environmental characterization of the Idaho National Engineering Laboratory (INEL). The INEL is a major US Department of Energy facility in southeastern Idaho dedicated to nuclear research, waste management, environmental restoration, and other activities related to the development of technology. Environmental information covered in this document includes land, air, water, and ecological resources; socioeconomic characteristics and land use; and cultural, aesthetic, and scenic resources.

  3. 76 FR 11426 - Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental...

    Science.gov (United States)

    2011-03-02

    ... Center, 3401 Cultural Center Drive, Port Arthur, TX. 10. Thursday, March 31, 2011: Texas A & M at... restoration types should be sent to: NOAA Restoration Center, Attn: DWH PEIS Comments, 263 13th Avenue South... County Government Center, County Commissioner Chambers, 840 W. 11th Street, Panama City, FL. 3. Monday...

  4. Attributes of Successful Actions to Restore Lakes and ...

    Science.gov (United States)

    As more success is achieved restoring lakes and estuaries from nutrient pollution, there is increased opportunity to evaluate the scientific, social, and policy factors associated with achieving restoration goals. We examined case studies where deliberate actions to reduce nutrient pollution resulted in ecological recovery. Cases were identified from scientific literature meeting the following: (1) scientific evidence of nutrient pollution; (2) restoration actions taken to mitigate nutrient pollution; and (3) documented ecological improvement. We identified 9 estuaries and 7 lakes spanning countries, climatic regions, physical types, depths, and watershed areas. Among these 8 achieved improvements short of stated restoration goals, 8 were successful initially, but then condition declined and 3 achieved their goals fully. We examined each case to identify both common attributes of nutrient management, grouped into ‘themes’, and the variations on those attributes, which were coded into categorical variables and examined using multiple correspondence analysis (MCA). MCA results suggested that the attributes most associated with achieving restoration goals include: (1) leadership by a dedicated watershed management agency; (2) governance through a bottom-up collaborative process; (3) a strategy that set numeric targets based on a specific ecological goal; and (4) actions to reduce nutrient loads from all sources. While our study did not provide a compreh

  5. Magnetic fusion program summary document

    International Nuclear Information System (INIS)

    1979-04-01

    This document outlines the current and planned research, development, and commercialization (RD and C) activities of the Offic of Fusion Energy under the Assistant Secretary for Energy Technology, US Department of Energy (DOE). The purpose of this document is to explain the Office of Fusion Energy's activities to Congress and its committees and to interested members of the public

  6. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nordstrom, Jenifer [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  7. Wind River Watershed restoration: 1999 annual report; ANNUAL

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    2001-01-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its first year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey-Columbia River Research Lab (USGS-CRRL), and WA Department of Fish and Wildlife (WDFW). Following categories given in the FY1999 Statement of Work, the broad categories, the related objectives, and the entities associated with each objective (lead entity in boldface) were as follows: Coordination-Objective 1: Coordinate the Wind River watershed Action Committee (AC) and Technical Advisory Committee (TAC) to develop a prioritized list of watershed enhancement projects. Monitoring-Objective 2: Monitor natural production of juvenile, smolt, and adult steelhead in the Wind River subbasin. Objective 3: Evaluate physical habitat conditions in the Wind River subbasin. Assessment-Objective 4: Assess watershed health using an ecosystem-based diagnostic model that will provide the technical basis to prioritize out-year restoration projects. Restoration-Objective 5: Reduce road related sediment sources by reducing road densities to less than 2 miles per square mile. Objective 6: Rehabilitate riparian corridors, flood plains, and channel morphology to reduce maximum water temperatures to less than 61 F, to increase bank stability to greater than 90%, to reduce bankfull width to depth ratios to less than 30, and to provide natural levels of pools and cover for fish. Objective 7: Maintain and evaluate passage for adult and juvenile steelhead at artificial barriers. Education

  8. Inhabiting the Delta: A Landscape Approach to Transformative Socio-Ecological Restoration

    Directory of Open Access Journals (Sweden)

    Brett Milligan

    2017-09-01

    Full Text Available doi: https://doi.org/10.15447/sfews.2017v15iss3art3Current legislation and plans for the Sacramento–San Joaquin Delta (Delta call for large-scale restoration of aquatic and terrestrial habitats, which will require significant changes in waterways, land uses, and cultural patterns. These re-made landscapes will be subject to a variety of new human uses, which Delta planning and adaptive management literature has yet to adequately consider. Failing to account for human uses and evolving place values can lead to diminished performance and public support for Delta restoration efforts. Our empirical study examined restored and naturalized Delta landscapes using an integrative landscape approach that seeks to reconcile multiple goals and land-use agendas that span ecological, social, economic, and political domains. The research design consisted of six overlapping methods that included a planning, policy, and law review specific to the Delta; surveys and interviews with approximately 100 land managers, scientists, land-owners, law-enforcement personnel, agency representatives, and Delta residents; nine case studies of restored and naturalized delta landscapes; GIS mapping; and extensive field work. Findings derived from the synthesis of these methods show that human uses of the Delta’s re-wilded landscapes are diverse and pervasive. Given the infrastructural and urbanized context of the region, these environments are subject to multiple and sometimes conflicting uses, perceptions, and place values. Though these myriad uses cannot be fully predicted or controlled (nor should they be, findings showed that more proactive and inclusive planning for human uses can encourage or discourage particular uses while also building constituency, support, and active engagement in ecological restoration efforts. We conclude that reconciling human uses with ecological recovery in the Delta will require a more localized, multi-functional, and creative approach to

  9. Have wet meadow restoration projects in the Southwestern U.S. been effective in restoring geomorphology, hydrology, soils, and plant species composition?

    Directory of Open Access Journals (Sweden)

    Ramstead Karissa M

    2012-09-01

    restoration was fully or partially effective, at least in the short-term. However, the relative lack of high quality quantitative data, and especially data extending more than two years after project implementation, greatly limits our ability to determine how effective restoration has truly been in practice. Conclusions While caution is warranted due to data quality limitations, progress has been made over the past 20 years in wet meadow restoration. In particular, important contributions have been made in restoring the highly degraded wet meadow systems that are characterized by deep, wide and relatively straight gullies. There is evidence, for example, that the pond-and-plug approach is an effective technique for restoring many aspects of these systems, albeit at the cost of creating new features (ponds that are not necessarily natural features of wet meadows. There is a need to allocate additional effort to project documentation, including better-designed and longer-lasting monitoring programs. One approach that might help is for practitioners to work with scientists from government agencies, local universities and colleges, and other organizations. When this type of collaboration has happened in the past it appears to have been effective. Many important lessons could have been learned, and mistakes avoided, if more effort had been put into documenting both successes and failures of past projects.

  10. ISV technology development plan for buried waste

    International Nuclear Information System (INIS)

    Nickelson, D.F.; Callow, R.A.; Luey, J.K.

    1992-07-01

    This report identifies the main technical issues facing the in situ vitrification (ISV) application to buried waste, and presents a plan showing the top-level schedule and projected resources needed to develop and demonstrate the technology for meeting Environmental Restoration Department (ERD) needs. The plan also proposes a model strategy for the technology transfer from the Department of Energy's Office of Technology Development (DOE-OTD) to the Office of Environmental Restoration (DOE-ER) as the technology proceeds from issues resolution (development) to demonstration and remedial readiness. Implementation of the plan would require $34,91 1K in total funding to be spread in the years FY-93 through FY-98. Of this amount, $10,183K is planned to be funded by DOE-OTD through the ISV Integrated Program. The remaining amount, $24,728K, is recommended to be split between the Department of Energy (DOE) Office of Technology Development ($6,670K) and DOE Office of Environmental Restoration ($18,058K)

  11. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This document Volume 2 in a two-volume series that comprise the site characterization report for the Environmental Restoration Disposal Facility. Volume 1 contains data interpretation and information supporting the conclusions in the main text. This document presents original data in support of Volume 1 of the report. The following types of data are presented: well construction reports; borehole logs; borehole geophysical data; well development and pump installation; survey reports; and preoperational baseline chemical data and aquifer test data. This does not represent the entire body of data available. Other types of information are archived at BHI Document Control. Five ground water monitoring wells were drilled at the Environmental Restoration Disposal Facility site to directly investigate site- specific hydrogeologic conditions. Well and borehole activity summaries are presented in Volume 1. Field borehole logs and geophysical data from the drilling are presented in this document. Well development and pump installation sheets are presented for the groundwater monitoring wells. Other data presented in this document include borehole geophysical logs from existing wells; chemical data from the sampling of soil, vegetation, and mammals from the ERDF to support the preoperational baseline; ERDF surface radiation surveys;a nd aquifer testing data for well 699-32-72B

  12. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  13. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  14. Documentation of Contraception and Pregnancy Intention In Medicaid Managed Care

    Directory of Open Access Journals (Sweden)

    Heike Thiel de Bocanegra

    2018-01-01

    Full Text Available Context: Clinical guidelines recommend the documentation of pregnancy intention and family planning needs during primary care visits. Prior to the 2014 Medicaid expansion and release of these guidelines, the documentation practices of Medicaid managed care providers are unknown. Methods: We performed a chart review of 1054 Medicaid managed care visits of women aged 13 to 49 to explore client, provider, and visit characteristics associated with documentation of immediate or future plans for having children and contraceptive method use. Five managed care plans used Current Procedural Terminology and International Classification of Diseases, Ninth Revision codes to identify providers with at least 15 women who had received family planning or well-woman care in 2013. We conducted multilevel logistic regression analyses with documentation of contraceptive method and pregnancy intention as outcome variables and clinic site as the level 2 random effect. Results: Only 12% of charts had documentation of pregnancy intention and 59% documented contraceptive use. Compared to women with a family planning visit reason, women with an annual, reproductive health, or primary care reason for their visit were significantly less likely to have contraception documented (odds ratio [OR] = 11.0; 95% confidence interval [CI] = 6.8-17.7. Age was also a significant predictor with women aged 30 to 49 (OR = 0.6; 95% CI = 0.4-0.9, and women aged 13 to 19 (OR = 0.2; 95% CI = 0.1-0.6 being less likely to have a note about pregnancy intention in their chart. Pregnancy intention was more likely to be documented in multispecialty clinics (OR = 15.5; 95% CI = 2.7-89.2. Conclusions: Interventions to improve routine medical record documentation of contraception and pregnancy intention regardless of patient age and visit characteristics are needed to facilitate the provision of family planning in managed care visits and, ultimately, achieving better maternal infant health outcomes

  15. Habitat Restoration as a Key Conservation Lever for Woodland Caribou: A review of restoration programs and key learnings from Alberta

    Directory of Open Access Journals (Sweden)

    Paula Bentham

    2015-12-01

    unified approach for restoration program planning, best practices, key performance indicators, and monitoring considerations for future programs within Canada.

  16. Perceptions of environmental change and use of traditional knowledge to plan riparian forest restoration with relocated communities in Alcântara, Eastern Amazon.

    Science.gov (United States)

    Celentano, Danielle; Rousseau, Guillaume Xavier; Engel, Vera Lex; Façanha, Cristiane Lima; Oliveira, Elivaldo Moreira de; Moura, Emanoel Gomes de

    2014-01-27

    Riparian forests provide ecosystem services that are essential for human well-being. The Pepital River is the main water supply for Alcântara (Brazil) and its forests are disappearing. This is affecting water volume and distribution in the region. Promoting forest restoration is imperative. In deprived regions, restoration success depends on the integration of ecology, livelihoods and traditional knowledge (TEK). In this study, an interdisciplinary research framework is proposed to design riparian forest restoration strategies based on ecological data, TEK and social needs. This study takes place in a region presenting a complex history of human relocation and land tenure. Local populations from seven villages were surveyed to document livelihood (including 'free-listing' of agricultural crops and homegarden tree species). Additionally, their perceptions toward environmental changes were explored through semi-structured interviews (n = 79). Ethnobotanical information on forest species and their uses were assessed by local-specialists (n = 19). Remnants of conserved forests were surveyed to access ecological information on tree species (three plots of 1,000 m2). Results included descriptive statistics, frequency and Smith’s index of salience of the free-list results. The local population depends primarily on slash-and-burn subsistence agriculture to meet their needs. Interviewees showed a strong empirical knowledge about the environmental problems of the river, and of their causes, consequences and potential solutions. Twenty-four tree species (dbh > 10 cm) were found at the reference sites. Tree density averaged 510 individuals per hectare (stdv = 91.6); and 12 species were considered the most abundant (density > 10ind/ha). There was a strong consensus among plant-specialists about the most important trees. The species lists from reference sites and plant-specialists presented an important convergence. Slash-and-burn agriculture is the main source of livelihood

  17. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  18. Proposed Site Treatment Plan (PSTP). STP reference document

    International Nuclear Information System (INIS)

    1995-01-01

    The Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare a plan describing the development of treatment capacities and technologies for treating mixed waste (hazardous/radioactive waste). DOE decided to prepare its site treatment plan in a three phased approach. The first phase, called the Conceptual Site Treatment Plan (CSTP), was issued in October 1993. At the Savannah River Site (SRS) the CSTP described mixed waste streams generated at SRS and listed treatment scenarios for each waste stream utilizing an onsite, offsite DOE, and offsite or onsite commercial or vendor treatment option. The CSTP is followed by the Draft Site Treatment Plan (DSTP), due to be issued in August 1994. The DSTP, the current activity., will narrow the options discussed in the CSTP to a preferred treatment option, if possible, and will include waste streams proposed to be shipped to SRS from other DOE facilities as well as waste streams SRS may send offsite for treatment. The SRS DSTP process has been designed to address treatment options for each of the site's mixed waste streams. The SRS Proposed Site Treatment Plan (PSTP) is due to be issued in February 1995. The compliance order would be derived from the PSTP

  19. Waste Management System Requirements Document

    International Nuclear Information System (INIS)

    1992-02-01

    This DCP establishes an interim plan for the Office of Civilian Radioactive Waste Management (OCRWM) technical baseline until the results of the OCRWM Document Hierarchy Task Force can be implemented. This plan is needed to maintain continuity in the Program for ongoing work in the areas of Waste Acceptance, Transportation, Monitored Retrievable Storage (MRS) and Yucca Mountain Site Characterization

  20. Rehabilitation of a patient with amelogenesis imperfecta using porcelain veneers and CAD/CAM polymer restorations: A clinical report.

    Science.gov (United States)

    Saeidi Pour, Reza; Edelhoff, Daniel; Prandtner, Otto; Liebermann, Anja

    2015-01-01

    The complete dental rehabilitation of patients with a vertical dimension loss (VDL) caused by structural enamel deficits associated with amelogenesis imperfecta (AI) represents a difficult challenge for restorative teams. Accurate analysis and treatment planning that includes esthetic and functional evaluations and adequate material selection are important prerequisites for successful results. Long-term provisional restorations play an important role in exploring and elucidating the patients' esthetic demands and functional needs. Restorative treatment options can vary from requiring only oral hygiene instructions to extensive dental restorations that include composite fillings, ceramic veneers, metal-ceramic, or all-ceramic crowns. This case report describes a full-mouth rehabilitation of a patient with amelogenesis imperfecta including the case planning, bite replacement, preparation, and restoration setting steps with an experimental CAD/CAM polymer and porcelain veneers.

  1. Restoring proximal caries lesions conservatively with tunnel restorations.

    Science.gov (United States)

    Chu, Chun-Hung; Mei, May L; Cheung, Chloe; Nalliah, Romesh P

    2013-07-30

    The tunnel restoration has been suggested as a conservative alternative to the conventional box preparation for treating proximal caries. The main advantage of tunnel restoration over the conventional box or slot preparation includes being more conservative and increasing tooth integrity and strength by preserving the marginal ridge. However, tunnel restoration is technique-sensitive and can be particularly challenging for inexperienced restorative dentists. Recent advances in technology, such as the contemporary design of dental handpieces with advanced light-emitting diode (LED) and handheld comfort, offer operative dentists better vision, illumination, and maneuverability. The use of magnifying loupes also enhances the visibility of the preparation. The advent of digital radiographic imaging has improved dental imaging and reduced radiation. The new generation of restorative materials has improved mechanical properties. Tunnel restoration can be an option to restore proximal caries if the dentist performs proper case selection and pays attention to the details of the restorative procedures. This paper describes the clinical technique of tunnel restoration and reviews the studies of tunnel restorations.

  2. BIM applied in historical building documentation and refurbishing

    Science.gov (United States)

    Cheng, H.-M.; Yang, W.-B.; Yen, Y.-N.

    2015-08-01

    Historical building conservation raises two important issues which are documentation and refurbishing. For the recording and documentation, we already have developed 3d laser scanner and such photogrammetry technology those represent a freeze object of virtual reality by digital documentation. On the other hand, the refurbished engineering of historic building is a challenge for conservation heritage which are not only reconstructing the damage part but also restoring tangible cultural heritage. 3D digital cultural heritage models has become a topic of great interest in recent years. One reason for this is the more widespread use of laser scanning and photogrammetry for recording cultural heritage sites. These technologies have made it possible to efficiently and accurately record complex structures remotely that would not have been possible with previous survey methods. In addition to these developments, digital information systems are evolving for the presentation, analysis and archival of heritage documentation.

  3. Wilmar joint market model, Documentation

    International Nuclear Information System (INIS)

    Meibom, P.; Larsen, Helge V.; Barth, R.; Brand, H.; Weber, C.; Voll, O.

    2006-01-01

    The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (Contract No. ENK5-CT-2002-00663). A User Shell implemented in an Excel workbook controls the Wilmar Planning Tool. All data are contained in Access databases that communicate with various sub-models through text files that are exported from or imported to the databases. The Joint Market Model (JMM) constitutes one of these sub-models. This report documents the Joint Market model (JMM). The documentation describes: 1. The file structure of the JMM. 2. The sets, parameters and variables in the JMM. 3. The equations in the JMM. 4. The looping structure in the JMM. (au)

  4. Wilmar joint market model, Documentation

    Energy Technology Data Exchange (ETDEWEB)

    Meibom, P.; Larsen, Helge V. [Risoe National Lab. (Denmark); Barth, R.; Brand, H. [IER, Univ. of Stuttgart (Germany); Weber, C.; Voll, O. [Univ. of Duisburg-Essen (Germany)

    2006-01-15

    The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (Contract No. ENK5-CT-2002-00663). A User Shell implemented in an Excel workbook controls the Wilmar Planning Tool. All data are contained in Access databases that communicate with various sub-models through text files that are exported from or imported to the databases. The Joint Market Model (JMM) constitutes one of these sub-models. This report documents the Joint Market model (JMM). The documentation describes: 1. The file structure of the JMM. 2. The sets, parameters and variables in the JMM. 3. The equations in the JMM. 4. The looping structure in the JMM. (au)

  5. Text document classification

    Czech Academy of Sciences Publication Activity Database

    Novovičová, Jana

    č. 62 (2005), s. 53-54 ISSN 0926-4981 R&D Projects: GA AV ČR IAA2075302; GA AV ČR KSK1019101; GA MŠk 1M0572 Institutional research plan: CEZ:AV0Z10750506 Keywords : document representation * categorization * classification Subject RIV: BD - Theory of Information

  6. A scientific basis for restoring fish spawning habitat in the St. Clair and Detroit Rivers of the Laurentian Great Lakes

    Science.gov (United States)

    Manny, Bruce A.; Roseman, Edward F.; Kennedy, Gregory W.; Boase, James C.; Craig, Jaquelyn; Bennion, David H.; Read, Jennifer; Vaccaro, Lynn; Chiotti, Justin A.; Drouin, Richard; Ellison, Roseanne

    2015-01-01

    Loss of functional habitat in riverine systems is a global fisheries issue. Few studies, however, describe the decision-making approach taken to abate loss of fish spawning habitat. Numerous habitat restoration efforts are underway and documentation of successful restoration techniques for spawning habitat of desirable fish species in large rivers connecting the Laurentian Great Lakes are reported here. In 2003, to compensate for the loss of fish spawning habitat in the St. Clair and Detroit Rivers that connect the Great Lakes Huron and Erie, an international partnership of state, federal, and academic scientists began restoring fish spawning habitat in both of these rivers. Using an adaptive management approach, we created 1,100 m2 of productive fish spawning habitat near Belle Isle in the Detroit River in 2004; 3,300 m2 of fish spawning habitat near Fighting Island in the Detroit River in 2008; and 4,000 m2 of fish spawning habitat in the Middle Channel of the St. Clair River in 2012. Here, we describe the adaptive-feedback management approach that we used to guide our decision making during all phases of spawning habitat restoration, including problem identification, team building, hypothesis development, strategy development, prioritization of physical and biological imperatives, project implementation, habitat construction, monitoring of fish use of the constructed spawning habitats, and communication of research results. Numerous scientific and economic lessons learned from 10 years of planning, building, and assessing fish use of these three fish spawning habitat restoration projects are summarized in this article.

  7. Treatment planning and smile design using composite resin.

    Science.gov (United States)

    Marus, Robert

    2006-05-01

    Recent advances in dental materials and adhesive protocols have expanded the restorative procedures available to today's clinicians. Used in combination with proper treatment planning, these innovations enable dental professionals to provide enhanced aesthetic care that achieves the increasing expectations of their patients. Using a case presentation, this article will document the steps required to harmoniously integrate smile design, material selection, and patient communication that are involved in the provisional of aesthetic dental care. This article discusses the utilization of composite resin as a tool to enhance the patient's smile. Upon reading this article, the reader should: Become familiar with a smile-enhancing technique which can be completed in one office visit. Realize the benefits that intraoral composite mockups offer in terms of prototyping and confirming patient satisfaction.

  8. Tiger team findings related to DOE environmental restoration activities

    International Nuclear Information System (INIS)

    Levitan, W.M.

    1991-01-01

    Tiger Team Assessments were implemented in June 1989 as part of a strategy to ensure that DOE facilities fully comply with Federal, state, local and DOE environment, safety, and health (ES ampersand H) requirements. The Tiger Teams provide the Secretary of Energy with information on current ES ampersand H compliance status of each DOE facility and causes for noncompliance. To date, Tiger Team Assessments have been completed at 25 DOE facilities. With regard to assessments of environmental restoration activities, the performance of DOE facilities was evaluated against the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, the National Contingency Plan (NCP), and DOE Order 5400.4, CERCLA Requirements, among others. Five major categories of environmental restoration-related findings were identified: (1) environmental restoration program planning and management (found at 60 percent of the sites assessed); (2) community relations/administrative record (60 percent); (3) characterization of extent of contamination (56 percent); (4) identification and evaluation of inactive waste sites (56 percent); and (5) DOE and NCP requirements for response action studies (44 percent). Primary causal factors for these findings were inadequate procedures, resources, supervision, and policy implementation

  9. Fiscal year 1999 waste information requirements document

    International Nuclear Information System (INIS)

    Adams, M.R.

    1998-01-01

    The Waste Information Requirements Document (WIRD) has the following purposes: To describe the overall drivers that require characterization information and to document their source; To define how characterization is going to satisfy the drivers, close issues, and measure and report progress; and To describe deliverables and acceptance criteria for characterization. Characterization information is required to maintain regulatory compliance, perform operations and maintenance, resolve safety issues, and prepare for disposal of waste. Commitments addressing these requirements are derived from the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement; the Recommendation 93-5 Implementation Plan (DOE-RL 1996a) to the Defense Nuclear Facilities Safety Board (DNFSB); and other requirement sources listed in Section 2.0. The Waste Information Requirements Document replaces the tank waste analysis plans and the tank characterization plan previously required by the Tri-Party Agreement, Milestone M-44-01 and M-44-02 series

  10. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2008-01-01

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (FFACO, 1996 (as amended February 2008)). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (1) CAS 01-23-02, Atmospheric Test Site - High Alt; (2) CAS 02-23-02, Contaminated Areas (2); (3) CAS 02-23-03, Contaminated Berm; (4) CAS 02-23-10, Gourd-Amber Contamination Area; (5) CAS 02-23-11, Sappho Contamination Area; (6) CAS 02-23-12, Scuttle Contamination Area; (7) CAS 03-23-24, Seaweed B Contamination Area; (8) CAS 03-23-27, Adze Contamination Area; (9) CAS 03-23-28, Manzanas Contamination Area; (10) CAS 03-23-29, Truchas-Chamisal Contamination Area; (11) CAS 04-23-02, Atmospheric Test Site T4-a; (12) CAS 05-23-06, Atmospheric Test Site; (13) CAS 09-23-06, Mound of Contaminated Soil; (14) CAS 10-23-04, Atmospheric Test Site M-10; and (15) CAS 18-23-02, U-18d Crater (Sulky). Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107. CAU 107 closure activities will consist of verifying that the current postings required under Title 10 Code of Federal Regulations (CFR) Part 835 are in place and implementing use restrictions (URs) at two sites, CAS 03-23-29 and CAS 18-23-02. The current radiological postings combined with the URs are adequate administrative controls to limit site access and worker dose

  11. Recovery from a chemical weapons accident or incident: A concept paper on planning

    Energy Technology Data Exchange (ETDEWEB)

    Herzenberg, C.L.; Haffenden, R.; Lerner, K.; Meleski, S.A.; Tanzman, E.A. [Argonne National Lab., IL (United States); Lewis, L.M. [US Dept. of Agriculture (United States); Hemphill, R.C. [Niagara Mohawk Power Corporation (United States); Adams, J.D. [US Environmental Protection Agency (United States)

    1994-04-01

    Emergency planning for an unintended release of chemical agent from the nation`s chemical weapons stockpile should include preparation for. the period following implementation of immediate emergency response. That period -- the recovery, reentry, and restoration stage -- is the subject of this report. The report provides an overview of the role of recovery, reentry, and restoration planning in the Chemical Stockpile Emergency Preparedness Program (CSEPP), describes the transition from immediate emergency response to restoration, and analyzes the legal framework that would govern restoration activities. Social, economic, and administrative issues, as well as technical ones, need to be considered in the planning effort. Because of possible jurisdictional conflicts, appropriate federal, state, and local agencies need to be included in a coordinated planning process. Advance consideration should be given to the pertinent federal and state statutes and regulations. On the federal level, the principal statutes and regulations to be considered are those associated with the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; and the National Environmental Policy Act. This report recommends that extensive preaccident planning be undertaken for the recovery, reentry, and restoration stage and outlines several key issues that should be considered in that planning. The need for interagency cooperation and coordination at all levels of the planning process is emphasized.

  12. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  13. Long-term surveillance plan for the Canonsburg, Pennsylvania, disposal site

    International Nuclear Information System (INIS)

    1995-10-01

    This document establishes elements of the US Department of Energy's (DOE) Long-Term Surveillance Plan for the Canonsburg, Pennsylvania, disposal site. The US Nuclear Regulatory Commission (NRC) will use this plan in support of license issuance for the long-term surveillance of the Canonsburg site. The Canonsburg (CAN) site is located within the borough of Canonsburg, Washington County, in southwestern Pennsylvania. The Canonsburg site covers approximately 30 acres (74 hectares). The disposal cell contains approximately 226,000 tons (241,000 tons) of residual radioactive material (RRM). Area C is southeast of the Canonsburg site, between Strabane Avenue and Chartiers Creek. Contaminated soils were removed from Area C during the remedial action, and the area was restored with uncontaminated fill material.After this cleanup, residual quantities of thorium-230 were detected at several Area C locations. The remedial action plan did not consider the ingrowth of radium-226 from thorium-230 as part of the Area C cleanup, and only two locations contained sufficient thorium-230 concentrations to result in radium-226 concentrations slightly above the US Environmental Protection Agency (EPA) standards

  14. Restoring proximal caries lesions conservatively with tunnel restorations

    Directory of Open Access Journals (Sweden)

    Chu CH

    2013-07-01

    Full Text Available Chun-Hung Chu1, May L Mei,1 Chloe Cheung,1 Romesh P Nalliah2 1Faculty of Dentistry, The University of Hong Kong, Hong Kong, People's Republic of China; 2Department of Restorative Dentistry and Biomaterials Sciences, Harvard School of Dental Medicine, Boston, MA, USA Abstract: The tunnel restoration has been suggested as a conservative alternative to the conventional box preparation for treating proximal caries. The main advantage of tunnel restoration over the conventional box or slot preparation includes being more conservative and increasing tooth integrity and strength by preserving the marginal ridge. However, tunnel restoration is technique-sensitive and can be particularly challenging for inexperienced restorative dentists. Recent advances in technology, such as the contemporary design of dental handpieces with advanced light-emitting diode (LED and handheld comfort, offer operative dentists better vision, illumination, and maneuverability. The use of magnifying loupes also enhances the visibility of the preparation. The advent of digital radiographic imaging has improved dental imaging and reduced radiation. The new generation of restorative materials has improved mechanical properties. Tunnel restoration can be an option to restore proximal caries if the dentist performs proper case selection and pays attention to the details of the restorative procedures. This paper describes the clinical technique of tunnel restoration and reviews the studies of tunnel restorations. Keywords: operative, practice, tunnel preparation, composite, amalgam, glass ionomer

  15. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  16. Treatment phases in management of a comprehensive restorative case. A case report

    International Nuclear Information System (INIS)

    AlSamh, Duaa Abo; Endo, Cert End

    2008-01-01

    The aim of this case report was to emphasize the value of preforming patient's treatment plan into phases of treatment and encouraging colleagues to apply such phases in the clinical practice for the management of complex restorative cases. Traditional approach to treatment planning has certain merits. However, new treatment approach should improve oral health rather than react to presenting problems and therefore, dentists should aim to convert their irregular attendee to a regular attendee with treatment plan directed to enhance oral health, prevent disease, improve esthetic and free the patient from pain and discomfort. In this report, a complex restorative case of a 16-year-old female patient was managed for comprehensive dental therapy in the form of treatment plan which was divided into phases by way of a ''staircase'' approach with one clinical step being dependent on the previous step. The whole treatment was completed in three months and the results were satisfactory and patient became a highly motivated person with more self-confidence. (author)

  17. 1994 INEL site-specific plan

    International Nuclear Information System (INIS)

    Couch, B.

    1994-01-01

    This report presents plans for environmental restoration and waste management activities at the Idaho National Engineering Laboratory for fiscal year 1994. This years's plan focuses on issues affecting the Environmental Restoration and Waste Management Programs. The Environmental Restoration Program is concerned with all aspects of assessment and cleanup of inactive operations. It involves assessing and cleaning up (where necessary) inactive INEL waste areas that could release harmful substances into the environment, as well as safely managing surplus nuclear facilities. The Waste Management program involves treatment, storage, and disposal of radioactive, hazardous, mixed, and industrial waste by DOE activities. This program is designed to protect the safety of INEL employees, the public, and the environment in the design, construction, maintenance, and operation of INEL treatment, storage, and disposal facilities. It operates facilities in a cost-effective, environmentally sound, regulatory compliant, and publicly acceptable manner

  18. Strategic planning for instream flow restoration: a case study of potential climate change impacts in the central Columbia River basin.

    Science.gov (United States)

    Donley, Erin E; Naiman, Robert J; Marineau, Mathieu D

    2012-10-01

    We provide a case study prioritizing instream flow restoration activities by sub-basin according to the habitat needs of Endangered Species Act (ESA)-listed salmonids relative to climate change in the central Columbia River basin in Washington State (USA). The objective is to employ scenario analysis to inform and improve existing instream flow restoration projects. We assess the sensitivity of late summer (July, August, and September) flows to the following scenario simulations - singly or in combination: climate change, changes in the quantity of water used for irrigation and possible changes to existing water resource policy. Flows for four sub-basins were modeled using the Water Evaluation and Planning system (WEAP) under historical and projected conditions of 2020 and 2040 for each scenario. Results indicate that Yakima will be the most flow-limited sub-basin with average reductions in streamflow of 41% under climate conditions of 2020 and 56% under 2040 conditions; 1.3-2.5 times greater than those of other sub-basins. In addition, irrigation plays a key role in the hydrology of the Yakima sub-basin - with flow reductions ranging from 78% to 90% under severe to extreme (i.e., 20-40%) increases in agricultural water use (2.0-4.4 times the reductions in the other sub-basins). The Yakima and Okanogan sub-basins are the most responsive to simulations of flow-bolstering policy change (providing salmon with first priority water allocation and at biologically relevant flows), as demonstrated by 91-100% target flows attained. The Wenatchee and Methow sub-basins do not exhibit similar responsiveness to simulated policy changes. Considering climate change only, we conclude that flow restoration should be prioritized first in the Yakima and Wenatchee sub-basins, and second in the Okanogan and Methow. Considering both climate change and possible policy changes, we recommend that the Yakima sub-basin receive the highest priority for flow restoration activities to sustain

  19. The potential of territory in ecological restoration. The use of GIS tools for ecological restoration prioritization

    International Nuclear Information System (INIS)

    Corzo Ramirez, Liliana; Jerena, Erik; Rubio Mendoza, Rodrigo

    2012-01-01

    This paper develops a proposal for interdisciplinary dialogue through the use of GIS (Geographic Information System) tools for the construction of a methodology to identify the ecological restoration potential ERP in urban edge areas that are part of the Main Ecological Structure of Bogota, according to land management plans. These areas subscribe their own socio-environmental problems particular to their own sign of the interaction between nature and culture. Methodological steps for identification of PER are described: biotic, physical and social characterization, identification and spatialization of variables and weighted overlay for the calculation of the final potential. Then, carry out the discussion on the scope and limitations of using GIS tools and methodological possibility for interaction between disciplines such as biology, physical geography and sociology during the process of ecological restoration.

  20. Challenges in developing a remediation plan, procurement plan and long term monitoring program for the former port radium uranium mine that meets the needs of the community of Deline - 59333

    International Nuclear Information System (INIS)

    Ward, Julie

    2012-01-01

    Document available in abstract form only. Full text of publication follows: After a five year political process to investigate historic and present day concerns about the former Port Radium Uranium Mine, the site has being remediated to present day standards. Prior to remediation Indian and Northern Affairs Canada (INAC) worked with Deline First Nations to develop a Remediation Plan that was suitable to the known environmental conditions and identified risks on site. Prior to remediation INAC obtained a land use permit and Waste Nuclear Substance License for the work that was carried out and for future storage of radioactive wastes. After the remediation plan was complete a procurement plan was developed for the work which followed Federal contracting polices, met the intent of the Sahtu Dene and Metis Comprehensive Land Claim Agreement and abided by INAC's commitment under the Canada Deline Uranium Table to maximize local participation and subcontracting opportunities. Lastly, INAC worked with Deline to develop a monitoring plan in hopes to begin to restore their confidence in their environment while monitoring engineered remedial structures and residual risks on site. (author)