WorldWideScience

Sample records for diversity-based model-guided construction

  1. HAM Construction modeling using COMSOL with MatLab Modeling Guide version 1.0.

    NARCIS (Netherlands)

    Schijndel, van A.W.M.

    2006-01-01

    This paper presents a first modeling guide for the modeling and simulation of up to full 3D dynamic Heat, Air & Moisture (HAM) transport of building constructions using COMSOL with Matlab. The modeling scripts are provided at the appendix. Furthermore, all modeling files and results are published at

  2. HAM Construction modeling using COMSOL with MatLab Modeling Guide, version 1.0

    NARCIS (Netherlands)

    Schijndel, van A.W.M.

    2006-01-01

    This paper presents a first modeling guide for the modeling and simulation of up to full 3D dynamic Heat, Air & Moisture (HAM) transport of building constructions using COMSOL with Matlab. The modeling scripts are provided at the appendix. Furthermore, all modeling files and results are published at

  3. Construction of 1,3,4-Oxadiazole and 1,3,4-Thiadiazole Library with a High Level of Skeletal Diversity Based on Branching Diversity-Oriented Synthesis on Solid-Phase Supports.

    Science.gov (United States)

    Ha, Ji-Eun; Yang, Seung-Ju; Gong, Young-Dae

    2018-02-12

    An efficient solid-phase synthetic route for the construction of 1,3,4-oxadiazole and 1,3,4-thiadiazole libraries based on branching diversity-oriented synthesis (DOS) has been developed in this study. The core skeleton resins, 1,3,4-oxadiazole and 1,3,4-thiadiazole, were obtained through desulfurative and dehydrative cyclizations of thiosemicarbazide resin, respectively. Various functional groups have been introduced to the core skeleton resins, such as aryl, amine, amide, urea, thiourea, and an amino acid. Most of the libraries were purified by simple trituration without extraction or column chromatography after cleavage of the products from the solid-supported resin. As a result, we obtained high yields of pure 1,3,4-oxadiazole and 1,3,4-thiadiazole derivatives (total numbers = 128). Finally, we confirmed the drug-like properties of our library by calculation of physicochemical properties, displays of the skeletal diversities of the library in 3D-space, and occupation of a broad range of areas by their functional groups.

  4. Integrated Baseline System (IBS) Version 2.0: Models guide

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Models Guide summarizes the IBS use of several computer models for predicting the results of emergency situations. These include models for predicting dispersion/doses of airborne contaminants, traffic evacuation, explosion effects, heat radiation from a fire, and siren sound transmission. The guide references additional technical documentation on the models when such documentation is available from other sources. The audience for this manual is chiefly emergency management planners and analysts, but also data managers and system managers.

  5. Integrated Baseline Bystem (IBS) Version 1.03: Models guide

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    The Integrated Baseline System)(IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planning and analysis. This document is the models guide for the IBS and explains how to use the emergency related computer models. This document provides information for the experienced system user, and is the primary reference for the computer modeling software supplied with the system. It is designed for emergency managers and planners, and others familiar with the concepts of computer modeling. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other IBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary.

  6. Genetic diversity based on SSR markers in maize (Zea mays L.)

    Indian Academy of Sciences (India)

    Home; Journals; Journal of Genetics; Volume 87; Issue 3. Genetic diversity based on SSR markers in maize (Zea mays L.) landraces from Wuling mountain region in China. Yao Qi-Lun Fang Ping Kang Ke-Cheng Pan Guang-Tang. Research Note Volume 87 Issue 3 December 2008 pp 287-291 ...

  7. A model-guided symbolic execution approach for network protocol implementations and vulnerability detection.

    Science.gov (United States)

    Wen, Shameng; Meng, Qingkun; Feng, Chao; Tang, Chaojing

    2017-01-01

    Formal techniques have been devoted to analyzing whether network protocol specifications violate security policies; however, these methods cannot detect vulnerabilities in the implementations of the network protocols themselves. Symbolic execution can be used to analyze the paths of the network protocol implementations, but for stateful network protocols, it is difficult to reach the deep states of the protocol. This paper proposes a novel model-guided approach to detect vulnerabilities in network protocol implementations. Our method first abstracts a finite state machine (FSM) model, then utilizes the model to guide the symbolic execution. This approach achieves high coverage of both the code and the protocol states. The proposed method is implemented and applied to test numerous real-world network protocol implementations. The experimental results indicate that the proposed method is more effective than traditional fuzzing methods such as SPIKE at detecting vulnerabilities in the deep states of network protocol implementations.

  8. A model-guided symbolic execution approach for network protocol implementations and vulnerability detection.

    Directory of Open Access Journals (Sweden)

    Shameng Wen

    Full Text Available Formal techniques have been devoted to analyzing whether network protocol specifications violate security policies; however, these methods cannot detect vulnerabilities in the implementations of the network protocols themselves. Symbolic execution can be used to analyze the paths of the network protocol implementations, but for stateful network protocols, it is difficult to reach the deep states of the protocol. This paper proposes a novel model-guided approach to detect vulnerabilities in network protocol implementations. Our method first abstracts a finite state machine (FSM model, then utilizes the model to guide the symbolic execution. This approach achieves high coverage of both the code and the protocol states. The proposed method is implemented and applied to test numerous real-world network protocol implementations. The experimental results indicate that the proposed method is more effective than traditional fuzzing methods such as SPIKE at detecting vulnerabilities in the deep states of network protocol implementations.

  9. The Influence Of Learning Model Guided Findings Of Student Learning Outcomes

    Directory of Open Access Journals (Sweden)

    A. SaefulBahri

    2015-03-01

    Full Text Available Abstract This study examines the influence of the learning model guided findings on student learning outcomes in subjects PAI eighth grade students of SMP Plus al Masoem. The research method used in this study is a quantitative method in the form of quasi-experiment Quasi-Experimental Design. The findings of the study are expected to demonstrate 1 the difference significant increase in learning outcomes between the experimental class using guided discovery method that uses the control class discussion of learning models 2 Constraints in the method of guided discovery activities and the limited ability of educators in the experimental class in implements the method of guided discovery and constraints faced by students while digging the information they need so we need special strategies to motivate students in the experimental class in order for them creatively find the right way to gather information that supports learning PAI.

  10. Roy's Adaptation Model-Guided Education and Promoting the Adaptation of Veterans With Lower Extremities Amputation.

    Science.gov (United States)

    Azarmi, Somayeh; Farsi, Zahra

    2015-10-01

    Any defect in extremities of the body can affect different life aspects. The purpose of this study was to investigate the effect of Roy's adaptation model-guided education on promoting the adaptation of veterans with lower extremities amputation. In a randomized clinical trial, 60 veterans with lower extremities amputation referring to Kowsar Orthotics and Prosthetics Center of veterans clinic in Tehran, Iran, were recruited with convenience method and were randomly assigned to intervention and control groups during 2013 - 2014. For data collection, Roy's adaptation model questionnaire was used. After completing the questionnaires in both groups, maladaptive behaviors were determined in the intervention group and an education program based on Roy's adaptation model was implemented. After two months, both groups completed the questionnaires again. Data was analyzed with SPSS software. Independent t-test showed statistically significant differences between the two groups in the post-test stage in terms of the total score of adaptation (P = 0.001) as well as physiologic (P = 0.0001) and role function modes (P = 0.004). The total score of adaptation (139.43 ± 5.45 to 127.54 ± 14.55, P = 0.006) as well as the scores of physiologic (60.26 ± 5.45 to 53.73 ± 7.79, P = 0.001) and role function (20.30 ± 2.42 to 18.13 ± 3.18, P = 0.01) modes in the intervention group significantly increased, whereas the scores of self-concept (42.10 ± 4.71 to 39.40 ± 5.67, P = 0.21) and interdependence (16.76 ± 2.22 to 16.30 ± 2.57, P = 0.44) modes in the two stages did not have a significant difference. Findings of this research indicated that the Roy's adaptation model-guided education promoted the adaptation level of physiologic and role function modes in veterans with lower extremities amputation. However, this intervention could not promote adaptation in self-concept and interdependence modes. More intervention is advised based on Roy's adaptation model for improving the

  11. Engineering a Functional Small RNA Negative Autoregulation Network with Model-Guided Design.

    Science.gov (United States)

    Hu, Chelsea Y; Takahashi, Melissa K; Zhang, Yan; Lucks, Julius B

    2018-05-22

    RNA regulators are powerful components of the synthetic biology toolbox. Here, we expand the repertoire of synthetic gene networks built from these regulators by constructing a transcriptional negative autoregulation (NAR) network out of small RNAs (sRNAs). NAR network motifs are core motifs of natural genetic networks, and are known for reducing network response time and steady state signal. Here we use cell-free transcription-translation (TX-TL) reactions and a computational model to design and prototype sRNA NAR constructs. Using parameter sensitivity analysis, we design a simple set of experiments that allow us to accurately predict NAR function in TX-TL. We transfer successful network designs into Escherichia coli and show that our sRNA transcriptional network reduces both network response time and steady-state gene expression. This work broadens our ability to construct increasingly sophisticated RNA genetic networks with predictable function.

  12. Constructed Wetlands

    Science.gov (United States)

    these systems can improve water quality, engineers and scientists construct systems that replicate the functions of natural wetlands. Constructed wetlands are treatment systems that use natural processes

  13. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  14. Electrochemical construction

    Science.gov (United States)

    Einstein, Harry; Grimes, Patrick G.

    1983-08-23

    An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

  15. Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmesen, Torkil; Hornbæk, Kasper Anders Søren

    2007-01-01

    Whereas research on usability predominantly employs universal definitions of the aspects that comprise usability, people experience their use of information systems through personal constructs. Based on 48 repertory-grid interviews, this study investigates how such personal constructs are affected...... use of constructs traditionally associated with usability (e.g., easy-to-use, intuitive, and liked). Further analysis of the data is ongoing...

  16. Construction mathematics

    CERN Document Server

    Virdi, Surinder; Virdi, Narinder Kaur

    2014-01-01

    Construction Mathematics is an introductory level mathematics text, written specifically for students of construction and related disciplines. Learn by tackling exercises based on real-life construction maths. Examples include: costing calculations, labour costs, cost of materials and setting out of building components. Suitable for beginners and easy to follow throughout. Learn the essential basic theory along with the practical necessities. The second edition of this popular textbook is fully updated to match new curricula, and expanded to include even more learning exercises. End of chapter exercises cover a range of theoretical as well as practical problems commonly found in construction practice, and three detailed assignments based on practical tasks give students the opportunity to apply all the knowledge they have gained. Construction Mathematics addresses all the mathematical requirements of Level 2 construction NVQs from City & Guilds/CITB and Edexcel courses, including the BTEC First Diploma in...

  17. FFTF constructibility

    International Nuclear Information System (INIS)

    Weber, S.A.; Hulbert, D.I.

    1975-01-01

    The influence of the design criteria on the constructibility of the Fast Flux Test Facility is described. Specifically, the effects of requirements due to maintenance accessibility, inerting of cells, seismicity, codes, and standards are addressed. The design and construction techniques developed to minimize the impact of the design criteria on cost and schedule are presented with particular emphasis on the cleanliness and humidity controls imposed during construction of the sodium systems. (U.S.)

  18. Construction Management.

    Science.gov (United States)

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  19. Construction fraud

    NARCIS (Netherlands)

    Graafland, J.J.; Liedekerke, L.; Dubbink, W.; van Liedekerke, L.; van Luijk, H.

    2011-01-01

    Due to the actions of a whistleblower The Netherlands was confronted with a massive case of construction fraud involving almost the entire construction sector. Price fixing, prior consulting, duplicate accounts, fictitious invoices and active corruption of civil servants were rampant practices. This

  20. Superstring construction

    CERN Document Server

    1989-01-01

    The book includes a selection of papers on the construction of superstring theories, mainly written during the years 1984-1987. It covers ten-dimensional supersymmetric and non-supersymmetric strings, four-dimensional heterotic strings and four-dimensional type-II strings. An introduction to more recent developments in conformal field theory in relation to string construction is provided.

  1. Robust frequency diversity based algorithm for clutter noise reduction of ultrasonic signals using multiple sub-spectrum phase coherence

    Energy Technology Data Exchange (ETDEWEB)

    Gongzhang, R.; Xiao, B.; Lardner, T.; Gachagan, A. [Centre for Ultrasonic Engineering, University of Strathclyde, Glasgow, G1 1XW (United Kingdom); Li, M. [School of Engineering, University of Glasgow, Glasgow, G12 8QQ (United Kingdom)

    2014-02-18

    This paper presents a robust frequency diversity based algorithm for clutter reduction in ultrasonic A-scan waveforms. The performance of conventional spectral-temporal techniques like Split Spectrum Processing (SSP) is highly dependent on the parameter selection, especially when the signal to noise ratio (SNR) is low. Although spatial beamforming offers noise reduction with less sensitivity to parameter variation, phased array techniques are not always available. The proposed algorithm first selects an ascending series of frequency bands. A signal is reconstructed for each selected band in which a defect is present when all frequency components are in uniform sign. Combining all reconstructed signals through averaging gives a probability profile of potential defect position. To facilitate data collection and validate the proposed algorithm, Full Matrix Capture is applied on the austenitic steel and high nickel alloy (HNA) samples with 5MHz transducer arrays. When processing A-scan signals with unrefined parameters, the proposed algorithm enhances SNR by 20dB for both samples and consequently, defects are more visible in B-scan images created from the large amount of A-scan traces. Importantly, the proposed algorithm is considered robust, while SSP is shown to fail on the austenitic steel data and achieves less SNR enhancement on the HNA data.

  2. Worldwide construction

    International Nuclear Information System (INIS)

    Williamson, M.

    1994-01-01

    The paper lists major construction projects in worldwide processing and pipelining, showing capacities, contractors, estimated costs, and time of construction. The lists are divided into refineries, petrochemical plants, sulfur recovery units, gas processing plants, pipelines, and related fuel facilities. This last classification includes cogeneration plants, coal liquefaction and gasification plants, biomass power plants, geothermal power plants, integrated coal gasification combined-cycle power plants, and a coal briquetting plant

  3. PENGEMBANGAN PERANGKAT PEMBELAJARAN MODEL GUIDED DISCOVERY BERBASIS LAB VIRTUAL UNTUK MEREDUKSI MISKONSEPSI SISWA SMK TOPIK EFEK FOTOLISTRIK

    Directory of Open Access Journals (Sweden)

    Muhammad Habibbulloh

    2017-06-01

    Full Text Available Penelitian ini bertujuan untuk menghasilkan perangkat pembelajaran model Guided Discovery berbasis lab virtual valid, praktis dan efektif untuk mereduksi miskonsepsi siswa SMK topik efek fotolistrik. Ujicoba perangkat pembelajaran diberikan kepada siswa kelas XII SMK IKIP Surabaya (Indonesia program keahlian Multimedia tahun ajaran 2015/2016 menggunakan one group pre-test post-test design. Pengumpulan data dilakukan dengan observasi, tes diagnostik, dan angket. Data dianalisis menggunakan analisis deskriptif kualitatif, kuantitatif dengan metode tingkat kecocokan (Percentage of Agreement untuk validasi perangkat, reduksi miskonsepsi melalui tes diagnostik kategori miskonsepsi didukung dengan uji-t. Temuan hasil penelitian adalah: (1 perangkat pembelajaran yang dikembangkan valid; (2 kepraktisan perangkat pembelajaran dianalisis melalui keterlaksanaan pembelajaran berkategori baik dan kendala yang ditemui berhasil diberikan solusi; dan (3 keefektifan perangkat pembelajaran dianalisis melalui reduksi miskonsepsi tes diagnostik yaitu post-test dibandingkan dengan pre-test dan nilai kategori miskonsepsi tes diagnostik di uji-t menunjukkan reduksi miskonsepsi yang signifikan. Berdasarkan temuan disimpulkan bahwa perangkat yang dikembangkan memenuhi syarat kevalidan, kepraktisan dan keefektivan untuk mereduksi miskonsepsi siswa SMK topik efek fotolistrik.

  4. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  5. Construction safety

    CERN Document Server

    Li, Rita Yi Man

    2013-01-01

    A close-to-ideal blend of suburb and city, speedy construction of towers of Babylon, the sparkling proportion of glass and steel buildings’ facade at night showcase the wisdom of humans. They also witness the footsteps, sweats and tears of architects and engineers. Unfortunately, these signatures of human civilizations are swathed in towering figures of construction accidents. Fretting about these on sites, different countries adopt different measures on sites. This book firstly sketches the construction accidents on sites, followed by a review on safety measures in some of the developing countries such as Bermuda, Egypt, Kuwait and China; as well as developed countries, for example, the United States, France and Singapore. It also highlights the enormous compensation costs with the courts’ experiences in the United Kingdom and Hong Kong.

  6. Constructing sanctions

    DEFF Research Database (Denmark)

    Jaeger, Mark Daniel

    2016-01-01

    such an effect. This paper explores sanctions conflicts as social constructs. It purports that rally-around-the-flag is all but one part of the discursive dimension of sanctions conflicts. Sanctions are intricately connected with the conflict setting they occur in. The study suggests a dialectical relation...... between how opponents perceive conflicts and the meaning of sanctions therein. This nexus of different constructions of sanctions moreover extends to “targeted” sanctions as well: As restrictive measures against Zimbabwe demonstrate, they are not the kind of minimally-invasive operations with clinical...

  7. Construction work

    CERN Multimedia

    2004-01-01

    Construction work on building 179 will start on the 16th February 2004 and continue until November 2004. The road between buildings 179 and 158 will temporarily become a one way street from Route Democrite towards building 7. The parking places between buildings 179 and 7 will become obsolete. The ISOLDE collaboration would like to apologize for any inconveniences.

  8. Overexpression of O-methyltransferase leads to improved vanillin production in baker's yeast only when complemented with model-guided network engineering.

    Science.gov (United States)

    Brochado, Ana Rita; Patil, Kiran R

    2013-02-01

    Overproduction of a desired metabolite is often achieved via manipulation of the pathway directly leading to the product or through engineering of distant nodes within the metabolic network. Empirical examples illustrating the combined effect of these local and global strategies have been so far limited in eukaryotic systems. In this study, we compared the effects of overexpressing a key gene in de novo vanillin biosynthesis (coding for O-methyltransferase, hsOMT) in two yeast strains, with and without model-guided global network modifications. Overexpression of hsOMT resulted in increased vanillin production only in the strain with model-guided modifications, exemplifying advantage of using a global strategy prior to local pathway manipulation. Copyright © 2012 Wiley Periodicals, Inc.

  9. Modelling Constructs

    DEFF Research Database (Denmark)

    Kindler, Ekkart

    2009-01-01

    , these notations have been extended in order to increase expressiveness and to be more competitive. This resulted in an increasing number of notations and formalisms for modelling business processes and in an increase of the different modelling constructs provided by modelling notations, which makes it difficult......There are many different notations and formalisms for modelling business processes and workflows. These notations and formalisms have been introduced with different purposes and objectives. Later, influenced by other notations, comparisons with other tools, or by standardization efforts...... to compare modelling notations and to make transformations between them. One of the reasons is that, in each notation, the new concepts are introduced in a different way by extending the already existing constructs. In this chapter, we go the opposite direction: We show that it is possible to add most...

  10. Constructing Catalonia

    Directory of Open Access Journals (Sweden)

    Bill Philips

    2009-07-01

    Full Text Available Catalonia, in common with other nations, has long been concerned with the question of identity and difference. Its problematic relationship with Spain has led to an emphasis on differentiating itself from its larger neighbour (if we are to accept, as most Spaniards do not, that Catalonia is not Spain, a situation complicated by the loss of the Spanish colonies of Cuba and The Philippines in 1898, and the Spanish Civil War and subsequent dictatorship from 1936 to 1976. Beginning in the late nineteenth century, the construction of a Catalan identity followed a similar route to that taken by other European nations such as England, Ireland and, indeed, Spain, including an emphasis on rural values, activities and the countryside, and the conversion of specifically local traditions into national past times. It is only in the last ten years or so that this model of Catalan identity has been recognised for what it is – a model constructed and encouraged for and by specific nationalist political interests. Ironically, Catalonia’s identity abroad has also been constructed and manipulated for political purposes, but from quite a different perspective. Orwell’s /Homage to Catalonia/ (1938 narrates an extremely blinkered version of the Spanish Civil War which has achieved iconic status as a result of cold war politics. Subsequent portrayals of the Spanish Civil War – Valentine Cunningham’s /The Penguin Book of Spanish Civil War Verse/ (ed., Penguin, 1980, or Ken Loach’s 1995 film /Land and Freedom/ base their arguments unquestioningly on /Homage to Catalonia/, perpetuating a view of the nation’s recent history that is both reductive and inaccurate

  11. Layout Construction

    DEFF Research Database (Denmark)

    Frandsen, Gudmund Skovbjerg; Palsberg, Jens; Schmidt, Erik Meineche

    We design a system for generating newspaper layout proposals. The input to the system consists of editorial information (text, pictures, etc) and style information (non-editorial information that specifies the aesthetic appearance of a layout). We consider the automation of layout construction...... to pose two main problems. One problem consists in optimizing the layout with respect to the constraints and preferences specified in the style information. Another problem consists in finding a representation of the style information that both supports its use in the combinatorial optimization...

  12. A cost-utility analysis of risk model-guided versus physician's choice antiemetic prophylaxis in patients receiving chemotherapy for early-stage breast cancer: a net benefit regression approach.

    Science.gov (United States)

    Thavorn, Kednapa; Coyle, Doug; Hoch, Jeffrey S; Vandermeer, Lisa; Mazzarello, Sasha; Wang, Zhou; Dranitsaris, George; Fergusson, Dean; Clemons, Mark

    2017-08-01

    We assessed the cost-effectiveness of a risk model-guided (RMG) antiemetic prophylaxis strategy compared with the physician's choice (PC) strategy in patients receiving chemotherapy for early-stage breast cancer. We conducted a cost-utility analysis based on a published randomized controlled trial of 324 patients with early-stage breast cancer undergoing chemotherapy at two Canadian cancer centers. Patients were randomized to receive their antiemetic treatments according to either predefined risk scores or the treating physician's preference. Effectiveness was measured as quality-adjusted life years (QALYs) gained. Cost and utility data were obtained from the Canadian published literature. We used generalized estimating equations to estimate the incremental cost-effectiveness ratios (ICERs) and 95% confidence intervals (CIs) over a range of willingness-to-pay values. The lower and upper bounds of the 95% CIs were used to characterize the statistical uncertainty for the cost-effectiveness estimates and construct cost-effectiveness acceptability curves. From the health care system's perspective, the RMG strategy was associated with greater QALYs gained (0.0016, 95% CI 0.0009, 0.0022) and higher cost ($49.19, 95% CI $24.87, $73.08) than the PC strategy, resulting in an ICER of $30,864.28 (95% CI $14,718.98, $62,789.04). At the commonly used threshold of $50,000/QALY, the probability that RMG prophylaxis is cost-effective was >94%; this probability increased with greater willingness-to-pay values. The risk-guided antiemetic prophylaxis is an economically attractive option for patients receiving chemotherapy for early-stage breast cancer. This information supports the implementation of risk prediction models to guide chemotherapy-induced nausea and vomiting prophylaxis in clinical practices.

  13. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  14. Metabolic network model guided engineering ethylmalonyl-CoA pathway to improve ascomycin production in Streptomyces hygroscopicus var. ascomyceticus.

    Science.gov (United States)

    Wang, Junhua; Wang, Cheng; Song, Kejing; Wen, Jianping

    2017-10-03

    Ascomycin is a 23-membered polyketide macrolide with high immunosuppressant and antifungal activity. As the lower production in bio-fermentation, global metabolic analysis is required to further explore its biosynthetic network and determine the key limiting steps for rationally engineering. To achieve this goal, an engineering approach guided by a metabolic network model was implemented to better understand ascomycin biosynthesis and improve its production. The metabolic conservation of Streptomyces species was first investigated by comparing the metabolic enzymes of Streptomyces coelicolor A3(2) with those of 31 Streptomyces strains, the results showed that more than 72% of the examined proteins had high sequence similarity with counterparts in every surveyed strain. And it was found that metabolic reactions are more highly conserved than the enzymes themselves because of its lower diversity of metabolic functions than that of genes. The main source of the observed metabolic differences was from the diversity of secondary metabolism. According to the high conservation of primary metabolic reactions in Streptomyces species, the metabolic network model of Streptomyces hygroscopicus var. ascomyceticus was constructed based on the latest reported metabolic model of S. coelicolor A3(2) and validated experimentally. By coupling with flux balance analysis and using minimization of metabolic adjustment algorithm, potential targets for ascomycin overproduction were predicted. Since several of the preferred targets were highly associated with ethylmalonyl-CoA biosynthesis, two target genes hcd (encoding 3-hydroxybutyryl-CoA dehydrogenase) and ccr (encoding crotonyl-CoA carboxylase/reductase) were selected for overexpression in S. hygroscopicus var. ascomyceticus FS35. Both the mutants HA-Hcd and HA-Ccr showed higher ascomycin titer, which was consistent with the model predictions. Furthermore, the combined effects of the two genes were evaluated and the strain HA

  15. Effect of Roy's Adaptation Model-Guided Education on Coping Strategies of the Veterans with Lower Extremities Amputation: A Double-Blind Randomized Controlled Clinical Trial.

    Science.gov (United States)

    Farsi, Zahra; Azarmi, Somayeh

    2016-04-01

    Any defect in the extremities of the body can affect different life aspects. The purpose of this study was to investigate the effect of Roy's adaptation model-guided education on coping strategies of the veterans with lower extremities amputation. In a double-blind randomized controlled clinical trial, 60 veterans with lower extremities amputation referring to Kowsar Orthotics and Prosthetics Center of Veterans Clinic in Tehran, Iran were recruited using convenience method and randomly assigned to intervention and control groups in 2013-2014. Lazarus and Folkman coping strategies questionnaire was used to collect the data. After completing the questionnaires in both groups, maladaptive behaviours were determined in the intervention group and an education program based on Roy's adaptation model was implemented. After 2 months, both groups completed the questionnaires again. Data were analyzed using SPSS software. Independent T-test showed that the score of the dimensions of coping strategies did not have a statistically significant difference between the intervention and control groups in the pre-intervention stage (P>0.05). This test showed a statistically significant difference between the two groups in the post-intervention stage in terms of the scores of different dimensions of coping strategies (P>0.05), except in dimensions of social support seeking and positive appraisal (P>0.05). The findings of this research indicated that the Roy's adaptation model-guided education improved the majority of coping strategies in veterans with lower extremities amputation. It is recommended that further interventions based on Roy's adaptation model should be performed to improve the coping of the veterans with lower extremities amputation. IRCT2014081118763N1.

  16. Testing a model-guided approach to the development of new thermoluminescent materials using YAG:Ln produced by solution combustion synthesis

    International Nuclear Information System (INIS)

    Milliken, E.D.; Oliveira, L.C.; Denis, G.; Yukihara, E.G.

    2012-01-01

    The objective of this work is to test a model-guided approach, coupled with an efficient material synthesis method, for the development of new thermoluminescent (TL) material using yttrium aluminum garnet (YAG, Y 3 Al 5 O 12 ) as a model material. We systematically investigated undoped and lanthanide-doped YAG using x-ray diffraction (XRD), TL, and radioluminescence (RL) to understand the role of the lanthanides in the TL process, i.e., whether they act as trapping centers or recombination centers. We also prepared samples with multiple dopants to test the possibility of creating materials with multiple TL peaks. The initial rise method of TL analysis was used to estimate the activation energies associated with the TL peaks. The role of the lanthanide impurities predicted using the lanthanide energy level diagram was largely confirmed, as evidenced by the TL curves, TL emission spectra and activation energy analysis. However, our data suggests that the exact role of the lanthanide dopants during the TL process depends on the thermal stability of the trapped charges, i.e. the same lanthanide can act as a trapping center in one system and as a recombination center in another system. These results demonstrate the possibility of introducing appropriate TL peaks and recombination centers in YAG produced by SCS by lanthanide doping, where the role of the lanthanide dopant is consistent with a model for the lanthanide energy levels. This allows for a more guided approach to the development of new TL materials with peaks in certain temperature range or multiple TL peaks, at least in conditions in which the model applies. - Highlights: ► TL peaks and recombination centers introduced in YAG by Ln doping. ► Role of the Ln consistent with model for the Ln energy levels. ► Model-guided approach to the development of new TL materials demonstrated.

  17. Constructing Aligned Assessments Using Automated Test Construction

    Science.gov (United States)

    Porter, Andrew; Polikoff, Morgan S.; Barghaus, Katherine M.; Yang, Rui

    2013-01-01

    We describe an innovative automated test construction algorithm for building aligned achievement tests. By incorporating the algorithm into the test construction process, along with other test construction procedures for building reliable and unbiased assessments, the result is much more valid tests than result from current test construction…

  18. Perspectives of construction robots

    Science.gov (United States)

    Stepanov, M. A.; Gridchin, A. M.

    2018-03-01

    This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.

  19. Construction completion report

    International Nuclear Information System (INIS)

    1990-01-01

    This Construction Completion Report documents the major construction projects at the Waste Isolation Pilot Plant (WIPP) site and related information on contracts, schedules, and other areas which affected construction. This report is not intended to be an exhaustive detailed analysis of construction, but is a general overview and summary of the WIPP construction. 10 refs., 29 figs

  20. Concrete construction engineering handbook

    CERN Document Server

    Nawy, Edward G

    2008-01-01

    Provides coverage of concrete construction engineering and technology. This work features discussions focusing on: the advances in engineered concrete materials; reinforced concrete construction; specialized construction techniques; and, design recommendations for high performance.

  1. Construction dust amelioration techniques.

    Science.gov (United States)

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  2. Improving concrete overlay construction.

    Science.gov (United States)

    2010-03-01

    Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...

  3. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  4. Visualization of construction engineering

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun

    2000-01-01

    It is required for nuclear power plant construction to reduce construction cost and shorten construction period. An early and accurate construction planning including schedule coordination among the companies has recently become more important and it is possible to obtain necessary information for construction planning in early stage. In this situation, we have been developing a visualization system for construction engineering for nuclear power plants. This system has an interface with the existing Plant Layout 3D-CAD system and consists of three sub systems: (1) Scheduling and simulation system, (2) Yard planning system and (3) Scaffolding planning system. This paper describes overview of this system. This visualization system is very helpful for construction engineers to easily understand situation and environment around installation area, to easily plan a work sequence and confirm the planned schedule, and it is also effective for customers and workers to understand the planning. As a result, this visualization system enables safety and high quality construction. (author)

  5. Construction Sector (NAICS 23)

    Science.gov (United States)

    Find environmental regulatory information for the construction sector, including the construction of buildings or engineering projects. This includes RCRA information for hazardous waste, refrigeration compliance, asbestos, effluent guidelines & lead laws

  6. Organizational Behaviour in Construction

    DEFF Research Database (Denmark)

    Kreiner, Kristian

    2013-01-01

    Review of: Organizational Behaviour in Construction / Anthony Walker (Wiley-Blackwell,2011 336 pp)......Review of: Organizational Behaviour in Construction / Anthony Walker (Wiley-Blackwell,2011 336 pp)...

  7. USAID Construction Assessment

    Data.gov (United States)

    US Agency for International Development — The USAID construction assessment is a survey of the character, scope, value and management of construction activities supported by USAID during the period from June...

  8. Validating MEDIQUAL Constructs

    Science.gov (United States)

    Lee, Sang-Gun; Min, Jae H.

    In this paper, we validate MEDIQUAL constructs through the different media users in help desk service. In previous research, only two end-users' constructs were used: assurance and responsiveness. In this paper, we extend MEDIQUAL constructs to include reliability, empathy, assurance, tangibles, and responsiveness, which are based on the SERVQUAL theory. The results suggest that: 1) five MEDIQUAL constructs are validated through the factor analysis. That is, importance of the constructs have relatively high correlations between measures of the same construct using different methods and low correlations between measures of the constructs that are expected to differ; and 2) five MEDIQUAL constructs are statistically significant on media users' satisfaction in help desk service by regression analysis.

  9. Heterotic string construction

    International Nuclear Information System (INIS)

    Schellekens, A.N.

    1989-01-01

    In this paper an elementary introduction to the principles of four-dimensional string construction will be given. Although the emphasis is on lattice constructions, almost all results have further, and often quite straightforward generalizations to other constructions. Since heterotic strings look phenomenologically more promising than type-II theories the authors only consider the former, although everything can easily be generalized to type-II theories. Some additional aspects of lattice constructions are discussed, and an extensive review can be found

  10. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  11. Automatic detection of the carotid artery boundary on cross-sectional MR image sequences using a circle model guided dynamic programming

    Directory of Open Access Journals (Sweden)

    Brambs Hans

    2011-04-01

    Full Text Available Abstract Background Systematic aerobe training has positive effects on the compliance of dedicated arterial walls. The adaptations of the arterial structure and function are associated with the blood flow-induced changes of the wall shear stress which induced vascular remodelling via nitric oxide delivered from the endothelial cell. In order to assess functional changes of the common carotid artery over time in these processes, a precise measurement technique is necessary. Before this study, a reliable, precise, and quick method to perform this work is not present. Methods We propose a fully automated algorithm to analyze the cross-sectional area of the carotid artery in MR image sequences. It contains two phases: (1 position detection of the carotid artery, (2 accurate boundary identification of the carotid artery. In the first phase, we use intensity, area size and shape as features to discriminate the carotid artery from other tissues and vessels. In the second phase, the directional gradient, Hough transform, and circle model guided dynamic programming are used to identify the boundary accurately. Results We test the system stability using contrast degraded images (contrast resolutions range from 50% to 90%. The unsigned error ranges from 2.86% ± 2.24% to 3.03% ± 2.40%. The test of noise degraded images (SNRs range from 16 to 20 dB shows the unsigned error ranging from 2.63% ± 2.06% to 3.12% ± 2.11%. The test of raw images has an unsigned error 2.56% ± 2.10% compared to the manual tracings. Conclusions We have proposed an automated system which is able to detect carotid artery cross sectional boundary in MRI sequences during heart cycles. The accuracy reaches 2.56% ± 2.10% compared to the manual tracings. The system is stable, reliable and results are reproducible.

  12. Sustainable construction: construction and demolition waste reconsidered.

    Science.gov (United States)

    del Río Merino, Mercedes; Izquierdo Gracia, Pilar; Weis Azevedo, Isabel Salto

    2010-02-01

    Construction activity in Europe has increased substantially in the past decade. Likewise, there has also been a commensurate rise in the generation of construction and demolition waste (C&DW). This, together with the fact that in many European countries the rate of recycling and reuse of C&DW is still quite low has engendered a serious environmental problem and a motivation to develop strategies and management plans to solve it. Due to its composition, there is a significant potential to reuse and/or recycle C&DW, and thereby, contribute to improving the sustainability of construction and development, but practical procedures are not yet widely known or practiced in the construction industry. This article (a) summarizes the different applications that are presently practiced to optimize the recovery and/or application of C&DW for reuse, and (b) proposes various measures and strategies to improve the processing of this waste. The authors suggest that to enhance environmental effectiveness, a conscious and comprehensive C&DW management plan should be implemented in each jurisdiction. More precisely, this study presents a holistic approach towards C&DW management, through which environmental benefits can be achieved through the application of new construction methods that can contribute to sustainable growth.

  13. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  14. Towards green construction

    International Nuclear Information System (INIS)

    Bajracharya, Bijaya B.; Shrestha, Prasanna M.

    2000-01-01

    Sustainability is the key to any development works. In the operation phase, hydro power is the most sustainable form of energy. However construction activities for the same power station are usually far from being green. The popular myth is that construction activity converts green into grey. Despite this popular myth, construction of a hydro power project in Nepal has made the project area greener than earlier during the construction phase itself. Choice of construction technology, appropriate level of environmental impact assessment, monitoring of environmental parameters along side the construction progress followed by mitigation at the right time; launching community development programmes side by side, having environmental specification in contractual documents and self-reliance to fulfill environmental obligations by contractors itself are the key factors in the environmental management within the construction activities. The main conclusions in the paper is the need to change the way to think about the project constraints

  15. How engineering facilitates construction

    International Nuclear Information System (INIS)

    Bailey, D.T.

    1976-01-01

    During a recent survey, construction personnel at jobsites were asked, ''what are the ten most unwanted construction problems.'' One reoccurring answer was design/construction incompatibility. In fact, many designs were impractical from a construction point of view. The reasons for this problem can be identified: Once construction begins, engineering is under intense pressure to issue new drawings to allow work to progress according to schedule. Other reasons may be the relative inexperience of the design personnel in construction, changes in design criteria and delays in receipt of supplier or client information. A description is presented of ways to solve this problem by obtaining construction expertise and input into the various phases and products of the engineering work

  16. Construction time of PWRs

    International Nuclear Information System (INIS)

    Moreira, João M.L.; Gallinaro, Bruno; Carajilescov, Pedro

    2013-01-01

    The construction time of PWRs is studied considering published data about nuclear power plants in the world. For the 268 PWRs in operation in 2010, the mode of the construction time distribution is around 5–6 years, and 80% of the plants were built in less than 120 months. To circumvent the problem of comparing plants with different size we normalized the construction time to plants with 1 GW. We restricted the analysis to 201 PWRs which suffered less from external factors that were beyond the control of the management from 1965 to 2010. The results showed that the normalized construction time did not increase over the years and nor with the plants’ gross power level. The learning rate of the industry regarding normalized construction times showed a reduction with 95% confidence level of about 0.56±0.07 months for each 10 GW of installed capacity. Over the years the normalized construction time decreased and became more predictable. The data showed that countries with more centralized regulatory, construction and operation environments were able to build PWRs in shorter times. Countries less experienced with the nuclear technology built PWRs in longer times. - Highlights: ► The construction time of PWRs is analyzed based on historical data. ► Different factors affecting construction time are considered in the analyses. ► The normalized construction time of PWRs decreased with time and gross power level. ► Countries with more centralized institutions built PWRs more quickly

  17. Constructing Student Problems in Phylogenetic Tree Construction.

    Science.gov (United States)

    Brewer, Steven D.

    Evolution is often equated with natural selection and is taught from a primarily functional perspective while comparative and historical approaches, which are critical for developing an appreciation of the power of evolutionary theory, are often neglected. This report describes a study of expert problem-solving in phylogenetic tree construction.…

  18. Professional entrepreneurial identity construction

    DEFF Research Database (Denmark)

    Ramsgaard, Michael Breum

    The present study investigates the construction of a professional identity as an entrepreneur in a sample of people with educational background in nutrition and health. The study examines the connection between professional identity construction and entrepreneurial business emergence using...... ‘entrepreneurial preparedness’ as parameter. This research seeks to address the following questions: What significant components or characteristics do entrepreneurs rely on in the early processes of constructing an entrepreneurial identity....

  19. Imperfect construction of microclusters

    Science.gov (United States)

    Schneider, E.; Zhou, K.; Gilbert, G.; Weinstein, Y. S.

    2014-01-01

    Microclusters are the basic building blocks used to construct cluster states capable of supporting fault-tolerant quantum computation. In this paper, we explore the consequences of errors on microcluster construction using two error models. To quantify the effect of the errors we calculate the fidelity of the constructed microclusters and the fidelity with which two such microclusters can be fused together. Such simulations are vital for gauging the capability of an experimental system to achieve fault tolerance.

  20. VE of construction industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-10-15

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  1. VE of construction industry

    International Nuclear Information System (INIS)

    1987-10-01

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  2. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  3. Evaluation of a Participatory Ergonomics Intervention in Small Commercial Construction Firms

    Science.gov (United States)

    Dale, Ann Marie; Jaegers, Lisa; Welch, Laura; Gardner, Bethany T.; Buchholz, Bryan; Weaver, Nancy; Evanoff, Bradley A.

    2017-01-01

    Background Work-related musculoskeletal disorders (WMSD) among construction workers remain high. Participatory ergonomics (PE) interventions that engage workers and employers in reducing work injury risks have shown mixed results. Methods Eight-six workers from seven contractors participated in a PE program. A logic model guided the process evaluation and summative evaluation of short term and intermediate impacts and long term outcomes from surveys and field records. Results Process measures showed good delivery of training, high worker engagement, and low contractor participation. Workers’ knowledge improved and workers reported changes to work practices and tools used; contractor provision of appropriate equipment was low (33%). No changes were seen in symptoms or reported physical effort. Conclusions The PE program produced many worker-identified ergonomic solutions, but lacked needed support from contractors. Future interventions should engage higher levels of the construction organizational system to improve contractor involvement for reducing WMSD. PMID:27094450

  4. Wall Construction; Carpentry: 901892.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in floor and wall layout, and in the diverse methods and construction of walls. Upon completion of this course the students should have acquired a knowledge of construction plans and structural foundations in addition to a basic knowledge of mathematics. The course consists of…

  5. Safety in construction?

    NARCIS (Netherlands)

    Swuste, P.H.J.J.

    2013-01-01

    The available literature on Construction Safety is not very optimistic about the chances of evidence-based safety in the construction industry exerting a positive influence. Many articles indicate that the structures and processes that are designed to ensure safety in the industry are poor. Safety

  6. INDOT Construction Inspection Priorities

    Science.gov (United States)

    2012-05-01

    In the last decade, the Indiana Department of Transportation (INDOT) has experienced an increase in their construction projects (e.g., INDOTs : construction spending was $789 million in 2006 and increased to $1,081.4 million in 2010); while the le...

  7. Employment and winter construction

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Larsen, Jacob Norvig

    2011-01-01

    Reduced seasonal building activity in the construction sector is often assumed to be related to hard winter conditions for building activities and poor working conditions for construction workers, resulting in higher costs and poor quality of building products, particularly in the northern hemisp...... of contracts for workers is more likely to explain differences in seasonal activity than climatic or technological factors....

  8. Human Resource Construction

    Institute of Scientific and Technical Information of China (English)

    2015-01-01

    Centering on strategic objective of reform and development,CIAE formulated its objectives in human resource construction for the 13th Five-year Plan period,and achieved new apparent progress in human resource construction in 2015.1 Implementation of"LONGMA Project"

  9. Governmentalities of Construction

    DEFF Research Database (Denmark)

    Gottlieb, Stefan; Jensen, Jens Stissing

    2016-01-01

    In this paper, we apply Foucault’s concept of governmentality in a dual analysis of the formation and transformation of the construction sector and the construction worker. The governmentality concept is well-suited for such an analysis as it directs attention to the ways in which control is the ...

  10. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Baddley, A.H.

    1981-01-01

    A method of constructing a radiation shielding plug for use in the roof of the coolant containment vault of liquid metal cooled fast breeder reactors is described. The construction allows relative movement of that part of service cables and pipes which are carried by the fixed roof and that part which is carried by the rotatable plug. (U.K.)

  11. Constructional and Conceptual Composition

    Science.gov (United States)

    Dodge, Ellen Kirsten

    2010-01-01

    Goldberg's (1995) recognition that, in addition to various word-level constructions, sentences also instantiate meaningful argument structure constructions enables a non-polysemy-based analysis of various verb 'alternations' (Levin 1993). In such an analysis, meaning variations associated with the use of the same verb in different argument…

  12. Personal Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmensen, Torkil; Hornbæk, Kasper

    2011-01-01

    Whereas the concept of usability is predominantly defined analytically, people relate to systems through personal usability constructs. Based on 48 repertory-grid interviews, this study investigates how such personal constructs are affected by two factors crucial to the international development...

  13. Industrialization for sustainable construction?

    NARCIS (Netherlands)

    Egmond - de Wilde De Ligny, van E.L.C.; Barrett, P; Amaratunga, D.; Haigh, R; Keraminiyage, K.; Pathirage, C

    2010-01-01

    Sustainable construction (SuCo), which genesis dates in the early 1990’s, advocates the creation and operation of a quality and healthy built environment based on resource efficiency, life cycle economics and ecological principles. (Kibert, 2003). Currently the Construction Industry does not meet

  14. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  15. VENTILATION NEEDS DURING CONSTRUCTION

    International Nuclear Information System (INIS)

    C.R. Gorrell

    1998-01-01

    The purpose of this analysis is to determine ventilation needs during construction and development of the subsurface repository and develop systems to satisfy those needs. For this analysis, construction is defined as pre-emplacement excavation and development is excavation that takes place simultaneously with emplacement. The three options presented in the ''Overall Development and Emplacement Ventilation Systems'' analysis (Reference 5.5) for development ventilation will be applied to construction ventilation in this analysis as well as adding new and updated ventilation factors to each option for both construction and development. The objective of this analysis is to develop a preferred ventilation system to support License Application Design. The scope of this analysis includes: (1) Description of ventilation conditions; (2) Ventilation factors (fire hazards, dust control, construction logistics, and monitoring and control systems); (3) Local ventilation alternatives; (4) Global ventilation options; and (5) Evaluation of options

  16. Construction in Occupied Spaces

    Directory of Open Access Journals (Sweden)

    Ward Andrew E.

    2017-06-01

    Full Text Available Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  17. Construction in Occupied Spaces

    Science.gov (United States)

    Ward, Andrew E.; Azhar, Salman; Khalfan, Malik

    2017-06-01

    Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  18. Construction and Demolition Waste

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund; Andersen, L.

    2011-01-01

    Construction and demolition waste (C&D waste) is the waste generated during the building, repair, remodeling or removal of constructions. The constructions can be roads, residential housing and nonresidential buildings. C&D waste has traditionally been considered without any environmental problems...... should be managed accordingly. Another reason is that it has been documented that a large fraction of C&D waste (about 90 %) can be easily recycled and thus can conserve landfill capacity. C&D waste may conveniently be divided into three subcategories: Buildings, roads and excavations. This chapter...

  19. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  20. Sustainability Base Construction Update

    Science.gov (United States)

    Mewhinney, Michael

    2012-01-01

    Construction of the new Sustainability Base Collaborative support facility, expected to become the highest performing building in the federal government continues at NASA's Ames Research Center, Moffet Field, Calif. The new building is designed to achieve a platinum rating under the leadership in Energy and Environment Design (LEED) new construction standards for environmentally sustainable construction developed by the U. S. Green Building Council, Washington, D. C. When completed by the end of 2011, the $20.6 million building will feature near zero net energy consumption, use 90 percent less potable water than conventionally build buildings of equivalent size, and will result in reduced building maintenance costs.

  1. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  2. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  3. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  4. Caltrans : construction manual

    Science.gov (United States)

    2009-08-01

    Caltrans intends this manual as a resource for all personnel engaged in contract administration. The manual establishes policies and procedures for the construction phase of Caltrans projects. However, this manual is not a contract document. It impos...

  5. Lead in Construction

    National Research Council Canada - National Science Library

    1993-01-01

    Although Occupational Safety and Health Administration (OSHA) regulations for occupational lead exposure have been in effect since 1971 for the construction and general industries, the agency regulations for general industry in 1978...

  6. On Construction Grammar

    Institute of Scientific and Technical Information of China (English)

    XIAO Kunxue

    2005-01-01

    Constructionist approach with its brand-new perspective has begun to demonstrate its dynamic power. This paper attempts to review the basic ideas, achievements and comparison with generative grammar of Construction Grammar and generalize some problems and future research prospects.

  7. Nuclear power plant construction

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1979-01-01

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.) [pt

  8. Skin Problems in Construction

    Science.gov (United States)

    ... you work with… Wet cement or plaster Abrasive cleaners Paints Adhesives Chemical solvents These materials can contain ... health hazards construction workers face on the job. Production of this card was supported by Grant OH009762 ...

  9. Passive solar construction handbook

    Energy Technology Data Exchange (ETDEWEB)

    Levy, E.; Evans, D.; Gardstein, C.

    1981-08-01

    Many of the basic elements of passive solar design are reviewed. The unique design constraints presented in passive homes are introduced and many of the salient issues influencing design decisions are described briefly. Passive solar construction is described for each passive system type: direct gain, thermal storage wall, attached sunspace, thermal storage roof, and convective loop. For each system type, important design and construction issues are discussed and case studies illustrating designed and built examples of the system type are presented. Construction details are given and construction and thermal performance information is given for the materials used in collector components, storage components, and control components. Included are glazing materials, framing systems, caulking and sealants, concrete masonry, concrete, brick, shading, reflectors, and insulators. The Load Collector Ratio method for estimating passive system performance is appended, and other analysis methods are briefly summarized. (LEW)

  10. Photovoltaic roof construction

    Energy Technology Data Exchange (ETDEWEB)

    Hawley, W.W.

    1980-02-26

    In a batten-seam roof construction employing at least one photovoltaic cell module, the electrical conduits employed with the at least one photovoltaic cell module are disposed primarily under the battens of the roof.

  11. Ship construction and welding

    CERN Document Server

    Mandal, Nisith R

    2017-01-01

    This book addresses various aspects of ship construction, from ship types and construction materials, to welding technologies and accuracy control. The contents of the book are logically organized and divided into twenty-one chapters. The book covers structural arrangement with longitudinal and transverse framing systems based on the service load, and explains basic structural elements like hatch side girders, hatch end beams, stringers, etc. along with structural subassemblies like floors, bulkheads, inner bottom, decks and shells. It presents in detail double bottom construction, wing tanks & duct keels, fore & aft end structures, etc., together with necessary illustrations. The midship sections of various ship types are introduced, together with structural continuity and alignment in ship structures. With regard to construction materials, the book discusses steel, aluminum alloys and fiber reinforced composites. Various methods of steel material preparation are discussed, and plate cutting and form...

  12. Construction and material specification

    Science.gov (United States)

    2002-01-01

    These Construction and Material Specifications are written to the Bidder before award of the : Contract and to the Contractor after award of the Contract. The sentences that direct the Contractor to perform Work are written as commands. For example, ...

  13. Constructive Consumer Choice Processes.

    OpenAIRE

    Bettman, James R; Luce, Mary Frances; Payne, John W

    1998-01-01

    Consumer decision making has been a focal interest in consumer research, and consideration of current marketplace trends ( e.g., technological change, an information explosion) indicates that this topic will continue to be critically important. We argue that consumer choice is inherently constructive. Due to limited processing capacity, consumers often do not have well-defined existing preferences, but construct them using a variety of strategies contingent on task demands. After describing c...

  14. ATLAS construction status

    International Nuclear Information System (INIS)

    Jenni, P.

    2006-01-01

    The ATLAS detector is being constructed at the LHC, in view of a data-taking startup in 2007. This report concentrates on the progress and the technical challenges of the detector construction, and summarizes the status of the work as of August 2004. The project is on track to allow the highly motivated ATLAS Collaboration to enter into a new exploratory domain of high-energy physics in 2007. (author)

  15. International Construction Measurement Standard

    OpenAIRE

    Mitchell, Charles

    2016-01-01

    The International Construction Measurement Standard Coalition (the Coalition) was formed on 17 June 2015 after meeting at the International Monetary Fund in Washington DC, USA. The Coalition, comprising the organisations listed below at the date of publication, aims to bring about consistency in construction cost reporting standards internationally. This is achieved by the creation and adoption of this ICMS, an agreed international standard for the structuring and presentation of cost reports...

  16. Quality during construction

    International Nuclear Information System (INIS)

    Rogers, C.B.

    1977-01-01

    This paper outlines the quality assurance program used by Bechtel Corp. in constructing Nuclear Power Plants. As a tool for scheduling and visualizing situations during construction, power plant scale models are used. The use of models, preplanning, detail scheduling, and early development of procedures and inspection plans, have all contributed to a lower cost integrated quality program. Quality control and quality assurance are built in, thus satisfying the regulatory requirements

  17. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  18. Constructability and maintainability

    International Nuclear Information System (INIS)

    Hart, R.S.

    1985-01-01

    A set of principles for minimizing the construction schedule was established at the outset of the CANDU 300 programme. Consideration of these principles and other factors led to the development of the unique CANDU 300 station layout. The paper discusses the CANDU 300 station layout and construction methods. In summary, the station layout provides 360 deg. construction access to all buildings, separation of nuclear and non-nuclear systems, precise and minimal physical interfaces between buildings, accommodation of many contractors and construction activities without interference, and maximum flexibility in terms of constructional, financial and supply arrangements. The CANDU 300 further employs modularization, shop fabrication and advanced instrumentation (multiplexers, remote processors, data highways) to minimize construction time. Many of the CANDU 300 features that enhance constructability also contribute to maintainability. These include the 360 deg. access to all principal buildings, the uncluttered and spacious building layouts, the simplification of systems and the high level of modularization. The CANDU 300 has also been designed to facilitate the replacement of all key components, thereby offering an essentially unlimited station life. A prime example is a reduction in the fuel channel inlet end-fitting diameter such that the fuel channels can be shop assembled and easily replaced after the initial 40 years of operation, without an extended unit outage. Maintainability within the reactor building has been given particular attention in the CANDU 300 design; key features of other CANDU reactors (the ability to replace a heat transport system pump motor at power, for example) have been incorporated, while accessibility and maintainability of all systems and components have been enhanced. These and other aspects of maintainability are discussed. (author)

  19. Construction time of PWRs

    Energy Technology Data Exchange (ETDEWEB)

    Carajilescov, Pedro; Moreira, Joao M.L., E-mail: pedro.carajilescov@ufabc.edu.b, E-mail: joao.moreira@ufabc.edu.b [Universidade Federal do ABC (UFABC), Santo Andre, SP (Brazil). Center of Engineering, Modeling and Applied Social Sciences

    2011-07-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  20. Construction time of PWRs

    International Nuclear Information System (INIS)

    Carajilescov, Pedro; Moreira, Joao M.L.

    2011-01-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  1. Constructive renormalization theory

    International Nuclear Information System (INIS)

    Rivasseau, Vincent

    2000-01-01

    These notes are the second part of a common course on Renormalization Theory given with Professor P. da Veiga. I emphasize here the rigorous non-perturbative or constructive aspects of the theory. The usual formalism for the renormalization group in field theory or statistical mechanics is reviewed, together with its limits. The constructive formalism is introduced step by step. Taylor forest formulas allow to perform easily the cluster and Mayer expansions which are needed for a single step of the renormalization group in the case of Bosonic theories. The iteration of this single step leads to further difficulties whose solution is briefly sketched. The second part of the course is devoted to Fermionic models. These models are easier to treat on the constructive level so they are very well suited to beginners in constructive theory. It is shown how the Taylor forest formulas allow to reorganize perturbation theory nicely in order to construct the Gross-Neveu 2 model without any need for cluster or Mayer expansions. Finally applications of this technique to condensed matter and renormalization group around Fermi surface are briefly reviewed. (author)

  2. ITER towards the construction

    International Nuclear Information System (INIS)

    Shimomura, Y.

    2005-01-01

    The ITER Project has been significantly developed in the last few years in preparation for its construction. The ITER Participant's Negotiators have developed the Joint Implementation Agreement (JIA), ready for finalisation following selection of the construction site and nomination of the project's Director General. The ITER International Team and Participant Teams have continued technical and organisational preparations. Construction will be able to start immediately after the international ITER organisation is established, following signature of the JIA. The Project is strongly supported by the governments of the Participants as well as by the scientific community. The real negotiations, including siting and the final details of cost sharing, started in December 2003. The EU, with Cadarache, and Japan, with Rokkasho, have both promised large contributions to the project to strongly support their construction site proposals. Their wish to host ITER construction is too strong to allow convergence to a single site considering the ITER device in isolation. A broader collaboration among the Parties is therefore being contemplated, covering complementary activities to help accelerate fusion development towards a viable power source, and allow the Participants to reach a conclusion on ITER siting. This report reviews these preparations, and the status of negotiations

  3. PIK reactor construction status

    International Nuclear Information System (INIS)

    Konoplev, K.A.; Smolsky, S.L.

    2001-01-01

    The 100MW reactor PIK for fundamental researches has a thermal neutron flux of more than 10 15 n/cm 2 sec. This presentation outlines the construction state as of 2001, its prospects and completion tactics in the conditions of unstable finance. Construction of the reactor started in 1976. In 1986 construction of the building was completed and significant part of the installation work fulfilled. Construction of cooling systems was finished, the control panel assembled, and adjustment of the pump and gate valve control circuits started. After Chernobyl catastrophe, the USSR nuclear reactor safety requirements were revised. The PIK design did not meet these requirements and underwent considerable revision. The reconstruction design resulted in double the initial cost. Creation of the containment was the bulkiest part of the reconstruction. It brought about the need to disassemble the roofing of the building, dismantle all the equipment of the two upper floors, and lay up the equipment of the lower floors. As of 2001, construction in accordance with the revised design is at the stage of assemblage of the most important units, i.e. reactor itself, cooling system, heavy water system, and a number of auxiliary systems, such as depleted fuel storage, emergency cooling system etc. (orig.)

  4. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  5. Labor construction trends

    International Nuclear Information System (INIS)

    McCall, H.W.

    1976-01-01

    The increasing costs and schedule delays being experienced in construction projects have led companies to look for alternatives to their present methods of expansion. One of the facets being evaluated is the construction labor posture. As a result, more companies are employing open shop contractors. Certain benefits can be realized by open shop construction. Productivity, in terms of the time required and overall costs, is definitely improved at no sacrifice in quality. Before an owner decides to build a project open shop, however, he must be fully aware of the pro's and con's of both types of labor posture. He must know to select a capable open shop contractor and he must realize his obligations for a successful open shop program

  6. APPLIED ORGANIZATION OF CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Kievskiy Leonid Vladimirovich

    2017-03-01

    Full Text Available Applied disciplines in the sphere of construction which are engaged in the solution of vital macroeconomical problems (the general trend of development of these disciplines is the expansion of problematics and mutual integration are considered. Construction organization characteristic at the present stage as a systems engineering discipline covering the investment process of creation of real estate items, is given. The main source of current research trends for applied sciences (socio-economic development forecasts, regional and local programs is determined. Interpenetration and integration of various fields of knowledge exemplified by the current interindustry problem of blocks renovation organization of existing development, is demonstrated. Mathematical model of wave construction (for the period of deployment is proposed. Nature of dependence of the total duration of renovation on the limit of annual input and coefficient of renovation, is established. Overall structure of the Moscow region housing market is presented, and approaches to definition of effective demand are proposed.

  7. Reliability and construction control

    Directory of Open Access Journals (Sweden)

    Sherif S. AbdelSalam

    2016-06-01

    Full Text Available The goal of this study was to determine the most reliable and efficient combination of design and construction methods required for vibro piles. For a wide range of static and dynamic formulas, the reliability-based resistance factors were calculated using EGYPT database, which houses load test results for 318 piles. The analysis was extended to introduce a construction control factor that determines the variation between the pile nominal capacities calculated using static versus dynamic formulae. From the major outcomes, the lowest coefficient of variation is associated with Davisson’s criterion, and the resistance factors calculated for the AASHTO method are relatively high compared with other methods. Additionally, the CPT-Nottingham and Schmertmann method provided the most economic design. Recommendations related to a pile construction control factor were also presented, and it was found that utilizing the factor can significantly reduce variations between calculated and actual capacities.

  8. Construction Management Meets Today's Realities.

    Science.gov (United States)

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  9. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  10. PWR plant construction in Japan

    International Nuclear Information System (INIS)

    Tamura, Toshifumi

    2002-01-01

    The construction methods based on the experiences on the Nuclear Island, which is a critical path in the total construction schedule, have been studied and reconsidered in order to construct by more reliable and economical method. So various improved construction method are being applied and the duration of construction is being reduced continuously. So various improved construction method are being applied and the duration of construction is being reduced continuously. In this paper, the history of construction of twenty-three (23) PWR Plant, the actual construction methods and schedule of Ohi-3/4, to which the many improved methods were applied during their construction, are introduced mainly with the improved points for previously constructed plants. And also the situation of construction method for the next PWR Plant is simply explained

  11. Constructive Preference Elicitation

    Directory of Open Access Journals (Sweden)

    Paolo Dragone

    2018-01-01

    Full Text Available When faced with large or complex decision problems, human decision makers (DM can make costly mistakes, due to inherent limitations of their memory, attention, and knowledge. Preference elicitation tools assist the decision maker in overcoming these limitations. They do so by interactively learning the DM’s preferences through appropriately chosen queries and suggesting high-quality outcomes based on the preference estimates. Most state-of-the-art techniques, however, fail in constructive settings, where the goal is to synthesize a custom or entirely novel configuration rather than choosing the best option among a given set of candidates. Many wide-spread problems are constructive in nature: customizing composite goods such as cars and computers, bundling products, recommending touristic travel plans, designing apartments, buildings, or urban layouts, etc. In these settings, the full set of outcomes is humongous and can not be explicitly enumerated, and the solution must be synthesized via constrained optimization. In this article, we describe recent approaches especially designed for constructive problems, outlining the underlying ideas and their differences as well as their limitations. In presenting them, we especially focus on novel issues that the constructive setting brings forth, such as how to deal with sparsity of the DM’s preferences, how to properly frame the interaction, and how to achieve efficient synthesis of custom instances.

  12. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  13. ACCELERATING CONSTRUCTION INDUSTRY DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Mohan M. Kumaraswamy

    2006-06-01

    Full Text Available The needs for construction industry development are initially viewed from the broader perspectives of imperatives for infrastructure development and national development. All these are clearly more critical in developing countries. A non-exhaustive set of potential drivers and common barriers to construction industry development is identified from previous research. These suggest the usefulness of consolidating a cluster of recent proposals and exercises aiming at (a construction organization development in terms of an over-arching management support system model, as well as improved information and knowledge management; and (b project team development in the context of relationally integrated teams and supply chains, joint risk management and ‘technology and knowledge exchange’ in joint ventures, as well as longer term public private partnerships. These apparently disparate research thrusts are threaded together into a pattern that may inspire, if not feed, specific research and development (R & D agendas for construction industry development in different countries according to their own priorities, constraints and stages of infrastructure and national development.

  14. Constructions of Peripherality

    DEFF Research Database (Denmark)

    Carter, Helen Frances Lindsay

    2013-01-01

    In this paper I focus on the concept of peripheralisation. In particular, I consider how peripheries can be discursively constructed in the debates surrounding planning cases, and how this might serve to legitimate particular interests. This is related to the case of a proposed golf resort...

  15. Nanotechnologies for sustainable construction

    DEFF Research Database (Denmark)

    Geiker, Mette Rica; Andersen, Maj Munch

    2009-01-01

    This chapter aims to highlight key aspects and recent trends in the development and application of nanotechnology to facilitate sustainable construction, use and demolition of buildings and infrastructure structures, ‘nanoconstruction’. Nanotechnology is not a technology but a very diverse...

  16. Provability Calculus of Constructions

    DEFF Research Database (Denmark)

    Nyblad, Kasten

    This thesis presents a type system, Provability Calculus of Constructions (PCoC) that can be used for the formalization of logic. In a theorem prover based on the system, the user can extend the prover with new inference rules in a logically consistent manner. This is done by representing PCo...

  17. KARATE WITH CONSTRUCTIVE LEARNING

    Directory of Open Access Journals (Sweden)

    Srikrishna Karanam

    2012-02-01

    Full Text Available Any conventional learning process involves the traditional hierarchy of garnering of information and then recall gathered information. Constructive learning is an important research area having wide impact on teaching methods in education, learning theories, and plays a major role in many education reform movements. It is observed that constructive learning advocates the interconnection between emotions and learning. Human teachers identify the emotions of students with varying degrees of accuracy and can improve the learning rate of the students by motivating them. In learning with computers, computers also should be given the capability to recognize emotions so as to optimize the learning process. Image Processing is a very popular tool used in the process of establishing the theory of Constructive Learning. In this paper we use the Optical Flow computation in image sequences to analyze the accuracy of the moves of a karate player. We have used the Lucas-Kanade method for computing the optical flow in image sequences. A database consisting of optical flow images by a group of persons learning karate is formed and the learning rates are analyzed in order to main constructive learning. The contours of flow images are compared with the standard images and the error graphs are plotted. Analysis of the emotion of the amateur karate player is made by observing the error plots.

  18. Mortality table construction

    Science.gov (United States)

    Sutawanir

    2015-12-01

    Mortality tables play important role in actuarial studies such as life annuities, premium determination, premium reserve, valuation pension plan, pension funding. Some known mortality tables are CSO mortality table, Indonesian Mortality Table, Bowers mortality table, Japan Mortality table. For actuary applications some tables are constructed with different environment such as single decrement, double decrement, and multiple decrement. There exist two approaches in mortality table construction : mathematics approach and statistical approach. Distribution model and estimation theory are the statistical concepts that are used in mortality table construction. This article aims to discuss the statistical approach in mortality table construction. The distributional assumptions are uniform death distribution (UDD) and constant force (exponential). Moment estimation and maximum likelihood are used to estimate the mortality parameter. Moment estimation methods are easier to manipulate compared to maximum likelihood estimation (mle). However, the complete mortality data are not used in moment estimation method. Maximum likelihood exploited all available information in mortality estimation. Some mle equations are complicated and solved using numerical methods. The article focus on single decrement estimation using moment and maximum likelihood estimation. Some extension to double decrement will introduced. Simple dataset will be used to illustrated the mortality estimation, and mortality table.

  19. Constructions in Wonderland

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard; Shibuya, Yoshikata

    -gram analysis to some different texts, including Lewis Carroll's 1865 novel Alice's Adventures in Wonderland (AW), Mark Twain's 1884/5 novel The Adventures of Huckleberry Finn (HF), and some US presidential speeches, to identify frequently (co)occurring words that may be indicative of underlying constructions...

  20. Constructing Regional advantage

    DEFF Research Database (Denmark)

    Asheim, Bjørn T.; Boschma, Ron; Cooke, Phil

    2011-01-01

    This paper presents a regional innovation policy model based on the idea of constructing regional advantage. This policy model brings together concepts like related variety, knowledge bases and policy platforms. Related variety attaches importance to knowledge spillovers across complementary...... economic development within and between regions in action lines appropriate to incorporate the basic principles behind related variety and differentiated knowledge bases....

  1. Predictable grammatical constructions

    DEFF Research Database (Denmark)

    Lucas, Sandra

    2015-01-01

    My aim in this paper is to provide evidence from diachronic linguistics for the view that some predictable units are entrenched in grammar and consequently in human cognition, in a way that makes them functionally and structurally equal to nonpredictable grammatical units, suggesting that these p......My aim in this paper is to provide evidence from diachronic linguistics for the view that some predictable units are entrenched in grammar and consequently in human cognition, in a way that makes them functionally and structurally equal to nonpredictable grammatical units, suggesting...... that these predictable units should be considered grammatical constructions on a par with the nonpredictable constructions. Frequency has usually been seen as the only possible argument speaking in favor of viewing some formally and semantically fully predictable units as grammatical constructions. However, this paper...... semantically and formally predictable. Despite this difference, [méllo INF], like the other future periphrases, seems to be highly entrenched in the cognition (and grammar) of Early Medieval Greek language users, and consequently a grammatical construction. The syntactic evidence speaking in favor of [méllo...

  2. AA under construction

    CERN Multimedia

    CERN PhotoLab

    1979-01-01

    The AA at an early stage of construction, in the newly built AA-Hall. Cable-trays already outline the shape of the accumulator ring. To the right are huge cable-drums for the pulse-forming-network (PFN) of the injection kicker. Seeing this picture, can one imagine that only 8 months later beams were circulating in the completed accumulator ring ?

  3. Housing and construction

    Science.gov (United States)

    Delton Alderman

    2014-01-01

    OECD economies, in aggregate, have been sluggish; unemployment remains high in several countries, and minimal gross domestic product gains are forecast for the Euro area through 2016. Recession, sovereign debt problems and lethargic economies continue to constrain Europe’s housing construction market; no improvement is expected before 2015 or...

  4. Patterns of Knowledge Construction

    Science.gov (United States)

    Chang, Bo

    2018-01-01

    The purpose of this study was to identify knowledge construction patterns in a local learning community. Observation, documents, and semistructured interviews were employed to collect data. Twenty learners were interviewed. Data were analyzed inductively using the constant comparative method. Five major patterns--radiation, circulation,…

  5. Neuroeconomics: Constructing identity

    NARCIS (Netherlands)

    Davis, J.B.

    2010-01-01

    The paper asks whether neuroeconomics will make instrumental use of neuroscience to adjudicate existing disputes in economics or be more seriously transformed by neuroscience in ways that might transform economics. The paper pursues the question by asking how neuroscience constructs an understanding

  6. Construction of monophase nets

    International Nuclear Information System (INIS)

    Suarez A, Jose Antonio

    1996-01-01

    The paper refers to the use of monophase loads in commercial residential urbanizations and in small industries, for this reason it is considered unnecessary the construction of three-phase nets. The author makes a historical recount of these nets in Bogota, his capacities, uses and energy savings

  7. Anyonic FRT construction

    International Nuclear Information System (INIS)

    Majid, S.; Rodriguez-Plaza, M.J.

    1994-01-01

    The Faddeev-Reshetikhin-Takhtajan method to construct matrix bialgebras from non-singular solutions of the quantum Yang-Baxter equation is extended to the anyonic or Z n -graded case. The resulting anyonic quantum matrices are braided groups in which the braiding is given by a phase factor. (orig.)

  8. Federal Environmental Requirements for Construction

    Data.gov (United States)

    Department of Veterans Affairs — This guide provides information on federal environmental requirements for construction projects. It is written primarily for owners of construction projects and for...

  9. Indigenous lunar construction materials

    Science.gov (United States)

    Rogers, Wayne P.; Sture, Stein

    1991-01-01

    The utilization of local resources for the construction and operation of a lunar base can significantly reduce the cost of transporting materials and supplies from Earth. The feasibility of processing lunar regolith to form construction materials and structural components is investigated. A preliminary review of potential processing methods such as sintering, hot-pressing, liquification, and cast basalt techniques, was completed. The processing method proposed is a variation on the cast basalt technique. It involves liquification of the regolith at 1200-1300 C, casting the liquid into a form, and controlled cooling. While the process temperature is higher than that for sintering or hot-pressing (1000-1100 C), this method is expected to yield a true engineering material with low variability in properties, high strength, and the potential to form large structural components. A scenario for this processing method was integrated with a design for a representative lunar base structure and potential construction techniques. The lunar shelter design is for a modular, segmented, pressurized, hemispherical dome which could serve as habitation and laboratory space. Based on this design, estimates of requirements for power, processing equipment, and construction equipment were made. This proposed combination of material processing method, structural design, and support requirements will help to establish the feasibility of lunar base construction using indigenous materials. Future work will refine the steps of the processing method. Specific areas where more information is needed are: furnace characteristics in vacuum; heat transfer during liquification; viscosity, pouring and forming behavior of molten regolith; design of high temperature forms; heat transfer during cooling; recrystallization of basalt; and refinement of estimates of elastic moduli, compressive and tensile strength, thermal expansion coefficient, thermal conductivity, and heat capacity. The preliminary

  10. Construction materials and Radon

    International Nuclear Information System (INIS)

    Paschuk, Sergei A.; Correa, Janine Nicolosi; Loriane, Fior; Schelin, Hugo R.; Pottker, Fabiana; Paula Melo, Vicente de

    2008-01-01

    Full text: Current studies have been performed with the aim to find the correlation of radon concentration in the air and used construction materials. At the first stage of the measurements different samples of materials used in civil construction were studied as a source of radon in the air and at the second step it was studied the radon infiltration insulation using different samples of finishing materials. For 222 Rn concentration measurements related to different construction materials as well as for the studies of radon emanation and its reduction, the sealed cell chambers, of approximately 60 x 60cm 2 , have been built using the ceramic and concrete blocks. This construction has been performed within protected and isolated laboratory environment to maintain the air humidity and temperature stable. These long term measurements have been performed using polycarbonate alpha track passive detectors. The exposure time was set about 15 days considering previous calibration performed at the Institute of Radiation Protection and Dosimetry (IRD/CNEN), where the efficiency of 70% was obtained for the density of alpha particle tracks about 13.8 cm -2 per exposure day and per kBq/m 3 of radon activity concentration. The chemical development of alpha tracks has been achieved by electrochemical etching. The track identification and counting have been done using a code based on the MATLAB Image Processing Toolbox. The cell chambers have been built following four principle steps: 1) Assembling the walls using the blocks and mortar; 2) Plaster installation; 3) Wall surface finishing using the lime; 4) Wall surface insulation by paint. Making the comparison between three layers installed at the masonry walls from concrete and ceramic blocks, it could be concluded that only wall painting with acrylic varnish attended the expectation and reduced the radon emanation flow by the factor of 2.5 approximately. Studied construction materials have been submitted the instant

  11. Tools for Social Construction

    DEFF Research Database (Denmark)

    Brynskov, Martin

    for social construction, i.e. supporting staging, performing, and sharing of playful activities involving people and artifacts.             The method used is a triangulation of the problem domain—pervasive media systems for children—from three perspectives: theory, design, and empirical work......: the potential of pervasive media systems to support the children’s social construction.  ......In this dissertation, I propose a new type of playful media for children. Based on field work, prototypes, and theoretical development, I define, build, and explore a distinct cross-section of existing and new digital media, tools, and communication devices in order to assess the characteristics...

  12. Construction quality assurance report

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Construction Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project

  13. Constructing criticality by classification

    DEFF Research Database (Denmark)

    Machacek, Erika

    2017-01-01

    " in the bureaucratic practice of classification: Experts construct material criticality in assessments as they allot information on the materials to the parameters of the assessment framework. In so doing, they ascribe a new set of connotations to the materials, namely supply risk, and their importance to clean energy......, legitimizing a criticality discourse.Specifically, the paper introduces a typology delineating the inferences made by the experts from their produced recommendations in the classification of rare earth element criticality. The paper argues that the classification is a specific process of constructing risk....... It proposes that the expert bureaucratic practice of classification legitimizes (i) the valorisation that was made in the drafting of the assessment framework for the classification, and (ii) political operationalization when enacted that might have (non-)distributive implications for the allocation of public...

  14. Lunar concrete for construction

    Science.gov (United States)

    Cullingford, Hatice S.; Keller, M. Dean

    1988-01-01

    Feasibility of using concrete for lunar-base construction has been discussed recently without relevant data for the effects of vacuum on concrete. Experimental studies performed earlier at Los Alamos have shown that concrete is stable in vacuum with no deterioration of its quality as measured by the compressive strength. Various considerations of using concrete successfully on the moon are provided in this paper along with specific conclusions from the existing data base.

  15. Nanotechnologies for sustainable construction

    DEFF Research Database (Denmark)

    Geiker, Mette Rica; Andersen, Maj Munch

    2009-01-01

    This chapter aims to highlight key aspects and recent trends in the development and application of nanotechnology to facilitate sustainable construction, use and demolition of buildings and infrastructure structures, ‘nanoconstruction’. Nanotechnology is not a technology but a very diverse...... technological field which covers many aspects. The chapter therefore seeks to provide a framework for addressing relevant issues of green nanoconstruction and to bring an overview and illustrative examples of current early developments....

  16. Industry Studies 2002: Construction

    Science.gov (United States)

    2002-01-01

    Jacksonville, FL Rotary Club of San Juan, San Juan, PR Tren Urbano Subway Project, San Juan, PR U.S. Army South, San Juan, PR U.S. Coast Guard Housing Project...Bechtel Corporation (IBM Plant Construction Site), Shanghai American Chamber of Commerce, Shanghai Urban Planning Exhibit, Shanghai 3 INTRODUCTION The...of states have or are working on a statewide or agency-wide privatization plan , including California, Maryland, Massachusetts, Michigan and

  17. LEAR construction completed

    CERN Multimedia

    CERN PhotoLab

    1982-01-01

    In July 1982, LEAR construction was completed, the individual systems had been dry-tested. On 16 July, the first 50 MeV (309 MeV/c) protons from Linac 1 were injected and circulated. On 11 October, the first antiprotons from the AA, decelerated in the PS to 609 MeV/c, were injected. Also in 1982, acceleration, deceleration and stochastic cooling were successfully tested. See 9007366 for a more detailed description. See also 8201061, 8204131, 8309026.

  18. Improving construction performance

    International Nuclear Information System (INIS)

    1990-03-01

    Design for Constructability's overall purpose was to identify and address changes in the nuclear industry to restore nuclear energy as an attractive option for new generating capacity. As the centerpiece of project control, a comprehensive, stable schedule should organize the project logically to accomplish the project's objectives. A good schedule will: integrate the project team; serve as a communications tool to all members of the project team; and provide a means to monitor and measure project performance

  19. NRC Construction Experience

    International Nuclear Information System (INIS)

    Rasmussen, Richard

    2013-01-01

    This presentation deals with the domestic and international construction experience sources. From the domestic (USA) point of view, the sources are event notifications, non-compliance reports, inspection reports, etc. Internationally, the presentation highlights the following sources: IRS and ConEx reports, Nuclear Events Web Based System (NEWS), bilateral agreements, MDEP, etc. It also mentions and describes briefly reported on concrete, rebar, fabrication and digital issues

  20. Toward a constructive physics

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, H.P.; Gefwert, C.; Manthey, M.J.

    1983-06-01

    We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2..pi..Gm/sub p//sup 2/) approx. = 1.7 x 10/sup 38/). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved.

  1. Toward a constructive physics

    International Nuclear Information System (INIS)

    Noyes, H.P.; Gefwert, C.; Manthey, M.J.

    1983-06-01

    We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2πGm/sub p/ 2 ) approx. = 1.7 x 10 38 ). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved

  2. Cooperation in Construction:

    DEFF Research Database (Denmark)

    Vogelius, Peter; Storgaard, Kresten

    2016-01-01

    The study presents a building project executed by a major Danish construction company, where cooperation and its staging were essential for achieving high productivity and competitiveness. The form of this cooperation is the main theme for the article. The contractor actively changed the communic......The study presents a building project executed by a major Danish construction company, where cooperation and its staging were essential for achieving high productivity and competitiveness. The form of this cooperation is the main theme for the article. The contractor actively changed...... the companies in the case can be understood as possessing a social capital which is enforced and united by initiatives of the main contractor. The social capital was built up and maintained through the actual constitution of cooperation already in the initial phase of bidding before the building process....... The management logic of the main contractor is interpreted as based on a sociology-inspired understanding focusing on norms and social values rather than on contractual (law) and functional (engineering) logic, which had hitherto been prevalent in Danish construction management....

  3. Toward construction of ITER

    International Nuclear Information System (INIS)

    Shimomura, Yasuo

    2005-01-01

    The ITER Project has been significantly developed in the past years in preparation for its construction. The ITER Negotiators have developed a draft Joint Implementation Agreement (JIA), ready for completion following the nomination of the Project's Director General (DG). The ITER International Team and Participant Teams have continued technical and organizational preparations. The actual construction will be able to start immediately after the international ITER organization will be established, following signature of the JIA. The Project is now strongly supported by all the participants as well as by the scientific community with the final high-level negotiations, focused on siting and the concluding details of cost sharing, started in December 2003. The EU, with Cadarache, and Japan, with Rokkasho, have both promised large contributions to the project to strongly support their construction site proposals. The extent to which they both wish to host the ITER facility is such that large contributions to a broader collaboration among the Parties are also proposed by them. This covers complementary activities to help accelerate fusion development towards a viable power source, as well as may allow the Participants to reach a conclusion on ITER siting. (author)

  4. INFINITY construction contract signed

    Science.gov (United States)

    2010-01-01

    Key state and community leaders celebrated April 6 with the signing of a construction contract for the state-of-the-art INFINITY Science Center planned near John C. Stennis Space Center in south Mississippi. Gulfport Mayor George Schloegel (l to r), chair of non-profit INFINITY Science Center Inc., was joined for the signing ceremony at the Hancock Bank in Gulfport by Virginia Wagner, sister of late Hancock Bank President Leo Seal Jr.; and Roy Anderson III, president and CEO of Roy Anderson Corp. Seal was the first chair of INFINITY Science Center Inc., which has led in development of the project. Roy Anderson Corp. plans to begin construction on the 72,000-square-foot, $28 million science and education center in May. The Mississippi Department of Transportation (MDOT) also is set to begin construction of a $2 million access road to the new center. The April 6 ceremony was attended by numerous officials, including former Stennis Space Center Directors Jerry Hlass and Roy Estess; Mississippi Senate President Pro Tempore Billy Hewes, R-Gulfport; Mississippi Rep. Diane Peranich, D-Pass Christian; and MDOT Southern District Commissioner Wayne Brown.

  5. Radioactive materials in construction projects

    International Nuclear Information System (INIS)

    Herrmann, Ralf; Ohlendorf, Frank; Kaltz, Andrea Christine

    2014-01-01

    Till 1990 residues often of the former uranium mining were partly used as building material for road construction, terrain compensation and house construction in Saxony. These recommendations for action are addressed to applicants, planners and building constructors in the engineering and construction sector. It provides information for planning, preliminary investigations, applications, construction supervision related to radiation protection measures and documentation of construction projects where radioactive materials are expected.

  6. Applying lean thinking in construction

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-12-01

    Full Text Available The productivity of the construction industry worldwide has been declining over the past 40 years. One approach for improving the situation is using lean construction. Lean construction results from the application of a new form of production management to construction. Essential features of lean construction include a clear set of objectives for the delivery process, aimed at maximizing performance for the customer at the project level, concurrent design, construction, and the application of project control throughout the life cycle of the project from design to delivery. An increasing number of construction academics and professionals have been storming the ramparts of conventional construction management in an effort to deliver better value to owners while making real profits. As a result, lean-based tools have emerged and have been successfully applied to simple and complex construction projects. In general, lean construction projects are easier to manage, safer, completed sooner, and cost less and are of better quality. Significant research remains to complete the translation to construction of lean thinking in Egypt. This research will discuss principles, methods, and implementation phases of lean construction showing the waste in construction and how it could be minimized. The Last Planner System technique, which is an important application of the lean construction concepts and methodologies and is more prevalent, proved that it could enhance the construction management practices in various aspects. Also, it is intended to develop methodology for process evaluation and define areas for improvement based on lean approach principles.

  7. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Aspden, G.J.

    1980-01-01

    A nuclear reactor construction comprising a reactor core submerged in a pool of liquid metal coolant in a primary vessel which is suspended from the roof structure of a containment vault. Control rods supported from the roof structure are insertable in the core which is carried on a support structure from the wall of the primary vessel. To prevent excessive relaxation of the support structure whereby the control rods would be displaced relative to the core, the support structure incorporates a normally inactive secondary structure designed to become effective in bracing the primary structure against further relaxation beyond a predetermined limit. (author)

  8. Constructive approach to supergravity

    International Nuclear Information System (INIS)

    Milton, K.A.; Urrutia, L.F.; Finkelstein, R.J.

    1980-01-01

    Starting from a first-order formulation of the Lagrangian of noninteracting massless helicity-2 and helicity-3/2 particles, global supersymmetry transformations are deduced. Then, allowing the supersymmetry transformations to become local requires, if supersymmetry is to be maintained, the introduction of a unique primitive interaction through the 'gravitino' stress tensor and torsion. Finally, the imposition of exact supersymmetry invariance leads by a short, constructive process to full supergravity and the complete form of the super-symmetry transformations. In particular, no explicit use is made of general coordinate invariance, and the self-consistency of the gravitational coupling emerges from the local supersymmetry requirement alone. (author)

  9. Reactor PIK construction

    International Nuclear Information System (INIS)

    Konoplev, Kir

    2003-01-01

    The construction work at the 100 MW researches reactor PIK in year 2002 was in progress. The main activity was concentrated on mechanical, ventilation and electrical equipment. Some systems and subsystems are under adjustment. Hydraulic driving gear for beam shutters are finished in installation, rinsing, and adjusting. Regulating rods test assembling was done. On the critical assembly the first reactor fueling was tested to evaluate the starting neutron source intensity and a sufficiency of existing control and instrument board. Mainline of the PIK facility design and neutron parameters are presented. (author)

  10. [Materials for construction sector].

    Science.gov (United States)

    Macchia, C

    2012-01-01

    The construction sector is characterized by high complexity due to several factors. There are a lot of processes within the building sites and they need the use of different materials with the help of appropriate technologies. Traditional materials have evolved and diversified, meanwhile new products and materials appeared and still appear, offering services which meet user needs, but that often involve risks to the health of workers. Research in the field of materials, promoted and carried out at various levels, has led to interesting results, encoded in the form of rules and laws.

  11. Assessing the sustainable construction of large construction companies in Malaysia

    Science.gov (United States)

    Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nasrun, Mohd Nawi Mohd

    2016-08-01

    Considering the increasing concerns for the consideration of sustainability issues in construction project delivery within the construction industry, this paper assesses the extent of sustainable construction among Malaysian large contractors, in order to ascertain the level of the industry's impacts on both the environment and the society. Sustainable construction explains the construction industry's responsibility to efficiently utilise the finite resources while also reducing construction impacts on both humans and the environment throughout the phases of construction. This study used proportionate stratified random sampling to conduct a field study with a sample of 172 contractors out of the 708 administered questionnaires. Data were collected from large contractors in the eleven states of peninsular Malaysia. Using the five-level rating scale (which include: 1= Very Low; 2= Low; 3= Moderate; 4= High; 5= Very High) to describe the level of sustainable construction of Malaysian contractors based on previous studies, statistical analysis reveals that environmental, social and economic sustainability of Malaysian large contractors are high.

  12. Innovations in nuclear concrete constructions

    International Nuclear Information System (INIS)

    Tatum, C.B.

    1983-01-01

    The technical requirements and scope of concrete work on nuclear projects present significant engineering and construction challenges. These demands represent the extremes in many areas of construction operations. In meeting these challenges, engineering and construction forces have developed several innovations which can be beneficially applied to other types of construction. Innovative approaches in the general categories of engineering scope, construction input to engineering, work planning, special methods and techniques, and satisfaction of quality assurance requirements are given in this paper. The transfer of this technology to other segments of the construction industry will improve overall performance by avoiding the problem areas encountered on nuclear projects

  13. Probabilistic pathway construction.

    Science.gov (United States)

    Yousofshahi, Mona; Lee, Kyongbum; Hassoun, Soha

    2011-07-01

    Expression of novel synthesis pathways in host organisms amenable to genetic manipulations has emerged as an attractive metabolic engineering strategy to overproduce natural products, biofuels, biopolymers and other commercially useful metabolites. We present a pathway construction algorithm for identifying viable synthesis pathways compatible with balanced cell growth. Rather than exhaustive exploration, we investigate probabilistic selection of reactions to construct the pathways. Three different selection schemes are investigated for the selection of reactions: high metabolite connectivity, low connectivity and uniformly random. For all case studies, which involved a diverse set of target metabolites, the uniformly random selection scheme resulted in the highest average maximum yield. When compared to an exhaustive search enumerating all possible reaction routes, our probabilistic algorithm returned nearly identical distributions of yields, while requiring far less computing time (minutes vs. years). The pathways identified by our algorithm have previously been confirmed in the literature as viable, high-yield synthesis routes. Prospectively, our algorithm could facilitate the design of novel, non-native synthesis routes by efficiently exploring the diversity of biochemical transformations in nature. Copyright © 2011 Elsevier Inc. All rights reserved.

  14. Probabilistic liver atlas construction.

    Science.gov (United States)

    Dura, Esther; Domingo, Juan; Ayala, Guillermo; Marti-Bonmati, Luis; Goceri, E

    2017-01-13

    Anatomical atlases are 3D volumes or shapes representing an organ or structure of the human body. They contain either the prototypical shape of the object of interest together with other shapes representing its statistical variations (statistical atlas) or a probability map of belonging to the object (probabilistic atlas). Probabilistic atlases are mostly built with simple estimations only involving the data at each spatial location. A new method for probabilistic atlas construction that uses a generalized linear model is proposed. This method aims to improve the estimation of the probability to be covered by the liver. Furthermore, all methods to build an atlas involve previous coregistration of the sample of shapes available. The influence of the geometrical transformation adopted for registration in the quality of the final atlas has not been sufficiently investigated. The ability of an atlas to adapt to a new case is one of the most important quality criteria that should be taken into account. The presented experiments show that some methods for atlas construction are severely affected by the previous coregistration step. We show the good performance of the new approach. Furthermore, results suggest that extremely flexible registration methods are not always beneficial, since they can reduce the variability of the atlas and hence its ability to give sensible values of probability when used as an aid in segmentation of new cases.

  15. Construction of Monju

    International Nuclear Information System (INIS)

    Yoshino, Kenichi; Ogiso, Zenichi; Nakamura, Kazuo; Nishida, Masaaki; Tateishi, Yoshinori; Mishima, Tsuyoshi

    1994-01-01

    The construction works was started in January, 1983. The main works can be divided into (1) the construction of the roads to the site including the repair of the prefectural road, (2) the preparation of the land for temporary installation outside the site, (3) the creation of the site, the excavation for building foundations, the change of the stream in the site, and the land side works of water intake and discharge facilities, (4) the sea area works of bank revetment, breakwaters and unloading quay, and (5) the manufacture of caissons and blocks in the Technoport Fukui about 60 km distant from the site. The main buildings are those for the reactor, reactor auxiliaries, maintenance and waste treatment, diesel engines, and the turbine. The aseismatic structure, the coolant temperature if it leaks were the main considerations. The manufacture, transport and installation of machinery and equipment are reported. The sodium of about 1700 t was imported from France. The MOX fuel for initial charge was produced, and the pellets were filled smoothly. (K.I.)

  16. Constructal vascularized structures

    Science.gov (United States)

    Cetkin, Erdal

    2015-06-01

    Smart features such as self-healing and selfcooling require bathing the entire volume with a coolant or/and healing agent. Bathing the entire volume is an example of point to area (or volume) flows. Point to area flows cover all the distributing and collecting kinds of flows, i.e. inhaling and exhaling, mining, river deltas, energy distribution, distribution of products on the landscape and so on. The flow resistances of a point to area flow can be decreased by changing the design with the guidance of the constructal law, which is the law of the design evolution in time. In this paper, how the flow resistances (heat, fluid and stress) can be decreased by using the constructal law is shown with examples. First, the validity of two assumptions is surveyed: using temperature independent Hess-Murray rule and using constant diameter ducts where the duct discharges fluid along its edge. Then, point to area types of flows are explained by illustrating the results of two examples: fluid networks and heating an area. Last, how the structures should be vascularized for cooling and mechanical strength is documented. This paper shows that flow resistances can be decreased by morphing the shape freely without any restrictions or generic algorithms.

  17. Scene construction in schizophrenia.

    Science.gov (United States)

    Raffard, Stéphane; D'Argembeau, Arnaud; Bayard, Sophie; Boulenger, Jean-Philippe; Van der Linden, Martial

    2010-09-01

    Recent research has revealed that schizophrenia patients are impaired in remembering the past and imagining the future. In this study, we examined patients' ability to engage in scene construction (i.e., the process of mentally generating and maintaining a complex and coherent scene), which is a key part of retrieving past experiences and episodic future thinking. 24 participants with schizophrenia and 25 healthy controls were asked to imagine new fictitious experiences and described their mental representations of the scenes in as much detail as possible. Descriptions were scored according to various dimensions (e.g., sensory details, spatial reference), and participants also provided ratings of their subjective experience when imagining the scenes (e.g., their sense of presence, the perceived similarity of imagined events to past experiences). Imagined scenes contained less phenomenological details (d = 1.11) and were more fragmented (d = 2.81) in schizophrenia patients compared to controls. Furthermore, positive symptoms were positively correlated to the sense of presence (r = .43) and the perceived similarity of imagined events to past episodes (r = .47), whereas negative symptoms were negatively related to the overall richness of the imagined scenes (r = -.43). The results suggest that schizophrenic patients' impairments in remembering the past and imagining the future are, at least in part, due to deficits in the process of scene construction. The relationships between the characteristics of imagined scenes and positive and negative symptoms could be related to reality monitoring deficits and difficulties in strategic retrieval processes, respectively. Copyright 2010 APA, all rights reserved.

  18. Microgripper construction kit

    Science.gov (United States)

    Gengenbach, Ulrich K.; Hofmann, Andreas; Engelhardt, Friedhelm; Scharnowell, Rudolf; Koehler, Bernd

    2001-10-01

    A large number of microgrippers has been developed in industry and academia. Although the importance of hybrid integration techniques and hence the demand for assembly tools grows continuously a large part of these developments has not yet been used in industrial production. The first grippers developed for microassembly were basically vacuum grippers and downscaled tweezers. Due to increasingly complex assembly tasks more and more functionality such as sensing or additional functions such as adhesive dispensing has been integrated into gripper systems over the last years. Most of these gripper systems are incompatible since there exists no standard interface to the assembly machine and no standard for the internal modules and interfaces. Thus these tools are not easily interchangeable between assembly machines and not easily adaptable to assembly tasks. In order to alleviate this situation a construction kit for modular microgrippers is being developed. It is composed of modules with well defined interfaces that can be combined to build task specific grippers. An abstract model of a microgripper is proposed as a tool to structure the development of the construction kit. The modular concept is illustrated with prototypes.

  19. Construction inspection manual of procedures

    Science.gov (United States)

    2009-01-01

    This manual provides highway construction personnel with relevant, practical information in order to perform accurate inspections and provide relevant construction procedural information for the various roadway and structures items of work. It is the...

  20. Structural Impact of Construction Loads

    Science.gov (United States)

    2012-08-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an underemphasized : topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to c...

  1. Priorities in Construction IT Research

    DEFF Research Database (Denmark)

    Gaarslev, Axel

    1999-01-01

    Gives the results of a survey of the use and needs of research in IT in relation to construction......Gives the results of a survey of the use and needs of research in IT in relation to construction...

  2. Construction of SPring-8 LINAC

    International Nuclear Information System (INIS)

    Yokomizo, Hideaki; Yoshikawa, Hiroshi; Suzuki, Shinsuke; Yanagida, Ken-ichi; Mizuno, Akihiko; Hori, Toshihiko; Tamezane, Kenji; Kodera, Masahiko; Sakaki, Hironao; Mashiko, Katsuo

    1993-01-01

    Construction of the linac building has been started in February 1993. The components of the linac are under manufacturing. The preinjector of linac was already constructed and temporarily installed in Tokai Establishment in order to test the beam quality. (author)

  3. Quantitative Identification of Construction Risk

    OpenAIRE

    Kasprowicz T.

    2017-01-01

    Risks pertaining to construction work relate to situations in which various events may randomly change the duration and cost of the project or worsen its quality. Because of possible significant changes of random events, favorable, moderate, and difficult conditions of construction work are considered. It is the first stage of the construction risk analysis. The probabilistic parameters of construction are identified and described by using the design characteristics model of the structure and...

  4. Bond yield curve construction

    Directory of Open Access Journals (Sweden)

    Kožul Nataša

    2014-01-01

    Full Text Available In the broadest sense, yield curve indicates the market's view of the evolution of interest rates over time. However, given that cost of borrowing it closely linked to creditworthiness (ability to repay, different yield curves will apply to different currencies, market sectors, or even individual issuers. As government borrowing is indicative of interest rate levels available to other market players in a particular country, and considering that bond issuance still remains the dominant form of sovereign debt, this paper describes yield curve construction using bonds. The relationship between zero-coupon yield, par yield and yield to maturity is given and their usage in determining curve discount factors is described. Their usage in deriving forward rates and pricing related derivative instruments is also discussed.

  5. Culture in constructive remembering

    DEFF Research Database (Denmark)

    Wagoner, Brady

    2012-01-01

    an alternative temporal metaphor of remembering as ‘construction’. If we push his metaphor further—with the help of cultural psychology—we can say memory construction is done by agents using cultural ‘tools’ such as language and narrative. In this chapter, Bartlett’s theory is contextualized, elucidated......, critiqued and developed with the help of a number of other thinkers. The ultimate aim of the chapter is to go beyond Bartlett and arrive at a thoroughgoing culturally inclusive psychological theory of remembering. Though Bartlett clearly situated remembering within a social process, he did not provide......The present chapter explores novel ways of thinking about what it means to remember and how precisely culture is involved in this process. Since Plato, the dominant metaphor for conceptualizing memory has been that of a spatial ‘storage’. In contrast to this, Frederic Bartlett advanced...

  6. Constructing visual representations

    DEFF Research Database (Denmark)

    Huron, Samuel; Jansen, Yvonne; Carpendale, Sheelagh

    2014-01-01

    tangible building blocks. We learned that all participants, most of whom had little experience in visualization authoring, were readily able to create and talk about their own visualizations. Based on our observations, we discuss participants’ actions during the development of their visual representations......The accessibility of infovis authoring tools to a wide audience has been identified as a major research challenge. A key task in the authoring process is the development of visual mappings. While the infovis community has long been deeply interested in finding effective visual mappings......, comparatively little attention has been placed on how people construct visual mappings. In this paper, we present the results of a study designed to shed light on how people transform data into visual representations. We asked people to create, update and explain their own information visualizations using only...

  7. TOTEM Construction Complete

    CERN Multimedia

    Katarina Anthony

    2011-01-01

    The winter technical stop saw the final steps of the installation of the TOTEM experiment. After 8 years of development, the inelastic telescope T1 was successfully installed inside CMS at both sides of the interaction point. This detector joins the previously installed inelastic telescope T2 and the Roman Pots (147m and 220m from the CMS interaction point) to study both elastic and inelastic proton scattering.   The Genova team who designed and built the detector in front of the '+' arm of the T1 telescope after final insertion. All the detector chambers were assembled at the Petersburg Nuclear Physics Institute, Gatchina, Russia. Major contributions to the construction of the support structure and the installation process came from CERN. “Installing the T1 detector was an important milestone for TOTEM,” says Joachim Baechler, Technical Coordinator for TOTEM. Enrico Robutti from Genova, responsible for the T1 project, added: "The T1 detector was carefully installed ...

  8. Perturbative and constructive renormalization

    International Nuclear Information System (INIS)

    Veiga, P.A. Faria da

    2000-01-01

    These notes are a survey of the material treated in a series of lectures delivered at the X Summer School Jorge Andre Swieca. They are concerned with renormalization in Quantum Field Theories. At the level of perturbation series, we review classical results as Feynman graphs, ultraviolet and infrared divergences of Feynman integrals. Weinberg's theorem and Hepp's theorem, the renormalization group and the Callan-Symanzik equation, the large order behavior and the divergence of most perturbation series. Out of the perturbative regime, as an example of a constructive method, we review Borel summability and point out how it is possible to circumvent the perturbation diseases. These lectures are a preparation for the joint course given by professor V. Rivasseau at the same school, where more sophisticated non-perturbative analytical methods based on rigorous renormalization group techniques are presented, aiming at furthering our understanding about the subject and bringing field theoretical models to a satisfactory mathematical level. (author)

  9. Skin Cut Construction

    DEFF Research Database (Denmark)

    2017-01-01

    projects - among others - from ARC are included: Soft Structures builds upon of a series of experimental use of EPS hot wire cutting, where the EPS eventually act as formwork for concrete casting. The processing of the EPS is distinct and delimited by the behaviour and form of both the robot and tool...... of steel and concrete makes it a reliable approach to many challenges in the realisation of buildings. Rebar Inside Out attempts to rethink the possibilities of the reinforced concrete composite starting from its inside. This means starting with the reinforcing steel, the production and shaping of this......, and then through that process build a workflow for the production of the concrete composite. It also means letting the steel out of the concrete, thereby positioning the two materials in a transnational relationship between steel construction and concrete composite....

  10. Derailed self-constructions

    DEFF Research Database (Denmark)

    Sørensen, Niels Ulrik; Nielsen, Jens Christian

    2017-01-01

    The chapter focuses on the construction of self amongst a group of young boys in Denmark who have had experience with eating disorders, self- harm, loneli-ness and other manifestations of a lack of well- being. At first glance, these manifestations of a lack of well- being seem rather distinct...... and incomparable, but they have in common the fact that the young boys who have had these experiences say that they are due to personal faults and imperfections. In other words, they are related to problematizing thematizations of the self. In the chapter, we investigate these problematizing thematizations...... and explore the ways that young boys understand and experience the self, and how they link this self to their lack of well-being. As will become apparent, fear of marginalization seems to be an important part of this connection: The young boys are struggling to live up to expectations in an increasingly...

  11. Environmentally friendly road construction

    Directory of Open Access Journals (Sweden)

    A.I. Essawy

    2013-06-01

    Full Text Available Environmental pollution is a major problem in developing countries like Egypt. Reuse of waste polymers is considered an attractive solution for environmental white pollution and reducing of the costs of road pavement and maintenance. This research aims to prepare environmentally friendly hot mix asphalt (HMA for paving using some industrial wastes as polypropylene and polyester fibers. The solid materials in the mix include normal and highly porous aggregates. 5% and 10% of waste polymers by weight of the asphalt were used to prepare special binders. The samples were tested for their physical properties, chemical properties, aging, scanning electron microscopy (SEM and thermo-gravimetric analysis (TGA. The results revealed that the prepared HMA using 5% of waste polymer had high performance as compared to the ordinary one and the waste polymer could be used in road construction.

  12. Constructing passive houses

    Energy Technology Data Exchange (ETDEWEB)

    Oehler, S. [Oehler Faigle Archkom Solar Architektur, Bretten (Germany)

    2005-07-01

    Everybody can learn to build energy-efficient. It needs theoretical and practical experience. 1997 we built the first freestanding Passive House in Europe, the Passive House Oehler. There had been a lot of questions, starting with the insecurity, whether the calculation program of the Passive House Institute, the PHPP, is working properly in our case. Nobody knew at that time because nobody tried it out before. It took us a lot of time to find out and every detail of the construction hat to be invented to meet the very high demand of thermal quality. All the following houses needed less time and had fewer open questions, adding one piece of experience with every building. 2002 we realised the biggest Passive House, the office building Energon Ulm with 420 working spaces. In the meantime we have learned a lot like how to produce prefabricated timber elements for the facades, providing good insulation, air tightness and avoiding serious thermal bridges. We have proofed, that any kind of building type can be a Passive House. And with increasing experience the freedom of design and construction is growing. Even the economical efficiency increased. The Energon Ulm is providing a much better indoor climate than any other office building and was build 10 % cheaper than an average German office building. At present the Passive House Standard is the most efficient solution for the user to live in the desired comfort zone between 20 C and 25 C. This zone of individual feeling-well can be described with the term ''operative temperature''. This term is defined by factors like air temperature, radiation temperature of warm and cold surfaces, air speed and humidity. The result of all these factors has to be within 18 C to 25 C without accepting one of the factors getting extreme.

  13. Constructing Data Curation Profiles

    Directory of Open Access Journals (Sweden)

    Michael Witt

    2009-12-01

    Full Text Available This paper presents a brief literature review and then introduces the methods, design, and construction of the Data Curation Profile, an instrument that can be used to provide detailed information on particular data forms that might be curated by an academic library. These data forms are presented in the context of the related sub-disciplinary research area, and they provide the flow of the research process from which these data are generated. The profiles also represent the needs for data curation from the perspective of the data producers, using their own language. As such, they support the exploration of data curation across different research domains in real and practical terms. With the sponsorship of the Institute of Museum and Library Services, investigators from Purdue University and the University of Illinois interviewed 19 faculty subjects to identify needs for discovery, access, preservation, and reuse of their research data. For each subject, a profile was constructed that includes information about his or her general research, data forms and stages, value of data, data ingest, intellectual property, organization and description of data, tools, interoperability, impact and prestige, data management, and preservation. Each profile also presents a specific dataset supplied by the subject to serve as a concrete example. The Data Curation Profiles are being published to a public wiki for questions and discussion, and a blank template will be disseminated with guidelines for others to create and share their own profiles. This study was conducted primarily from the viewpoint of librarians interacting with faculty researchers; however, it is expected that these findings will complement a wide variety of data curation research and practice outside of librarianship and the university environment.

  14. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  15. Prefabrication in Building Construction: A Perspective of Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Nafees Ahmed Memon

    2014-07-01

    Full Text Available Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight method as a MCDM approach. The results depict that main advantages of prefabrication are ?Shorter construction time? and ?Less construction site waste?. The top hindrances in adopting prefabrication as identified in this study are: ?Higher initial construction cost? and ?Inflexible for design changes?. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan

  16. Prefabrication in building construction: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.; Khehro, S.H.

    2014-01-01

    Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight) method as a MCDM approach. The results depict that main advantages of prefabrication are Shorter construction time and Less construction site waste. The top hindrances in adopting prefabrication as identified in this study are: Higher initial construction cost and Inflexible for design changes. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan. (author)

  17. Geotextiles in Flexible Pavement Construction

    Science.gov (United States)

    Alungbe, Gabriel D.

    2004-01-01

    People everywhere in the developed world regularly drive on paved roads. Learning about the construction techniques and materials used in paving benefits technology and construction students. This article discusses the use of geosynthetic textiles in pavement construction. It presents background on pavements and describes geotextiles and drainage…

  18. Advanced construction methods in ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Choy, E.; Yu, S.K.W.

    2002-01-01

    The ACR - Advanced CANDU Reactor, developed by Atomic Energy of Canada Limited (AECL), is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. This necessitated a much more comprehensive approach in including constructability considerations in the design to ensure that the construction duration is met. For the ACR-700, a project schedule of 48 months has been developed for the nth replicated unit with a 36 month construction period duration from First Concrete to Fuel Load. An overall construction strategy that builds on the success of the construction methods that are proven in the construction of the Qinshan CANDU 6 project has been developed for the ACR. The overall construction strategy comprises the 'Open Top' construction technique using a Very Heavy Lift crane, parallel construction activities, with extensive modularization and prefabrication. In addition, significant applications of up to date construction technology will be implemented, e.g. large volume concrete pours, prefabricated rebar, use of climbing forms, composite structures, prefabricated permanent formwork, automatic welding, and utilization of the latest electronic technology tools such as 3D CADDs modelling yields a very high quality, clash free product to allow construction to be completed 'right the first time' and eliminates rework. Integration of 3D CADDs models and scheduling tools such as Primavera has allowed development of actual construction sequences and an iterative approach to schedule verification and improvement. Modularization and prefabrication are major features of the ACR design in order to achieve the project schedule. For the reactor building approximately 80% of the volume will be installed as modules or prefabricated assembles. This ensures critical path activities are achieved. This paper examines the advanced construction methods implemented in the design in order to

  19. Construction industry in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Moavenzadeh, F

    1978-01-01

    This paper provides a review of the construction capability available in the developing countries to meet the demand for shelter. It discusses the role of construction in the process of development and its importance to economic growth. It considers the issue facing the growth of a viable indigenous construction industry in the developing world within the context of the activities involved in the creation of constructed facilities--planning, design, contruction and maintenance; it also examines the environment within which the industry has developed. For each construction activity the paper reviews available capabilities, the various resources needed for the development of an indigenous industry, and some possible means of accommodating these needs.

  20. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  1. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  2. Research on construction quality and improvement of assembly construction

    Science.gov (United States)

    Cheng, Fei

    2017-11-01

    Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.

  3. SUBSURFACE CONSTRUCTION AND DEVELOPMENT ANALYSIS

    International Nuclear Information System (INIS)

    N.E. Kramer

    1998-01-01

    The purpose of this analysis is to identify appropriate construction methods and develop a feasible approach for construction and development of the repository subsurface facilities. The objective of this analysis is to support development of the subsurface repository layout for License Application (LA) design. The scope of the analysis for construction and development of the subsurface Repository facilities covers: (1) Excavation methods, including application of knowledge gained from construction of the Exploratory Studies Facility (ESF). (2) Muck removal from excavation headings to the surface. This task will examine ways of preventing interference with other subsurface construction activities. (3) The logistics and equipment for the construction and development rail haulage systems. (4) Impact of ground support installation on excavation and other construction activities. (5) Examination of how drift mapping will be accomplished. (6) Men and materials handling. (7) Installation and removal of construction utilities and ventilation systems. (8) Equipping and finishing of the emplacement drift mains and access ramps to fulfill waste emplacement operational needs. (9) Emplacement drift and access mains and ramps commissioning prior to handover for emplacement operations. (10) Examination of ways to structure the contracts for construction of the repository. (11) Discussion of different construction schemes and how to minimize the schedule risks implicit in those schemes. (12) Surface facilities needed for subsurface construction activities

  4. Political construction of technology

    International Nuclear Information System (INIS)

    Bruheze, A.A.A. de la.

    1992-01-01

    In the 1970s radioactive waste disposal became a controversial scientific and social issue in the United States, after the US Atomic Energy Commission (AEC) charged with the development, regulation and promotion of nuclear technology, had tried to implement its disposal technology near Lyons, Kansas. This study traces the emergence of this controversy as part of the long-term development of the US radioactive waste disposal technology. Radioactive waste was not always considered a problem, and different meanings were attached to radwaste in the 1940s and early 1950s. Problem definitions and technical designs that underlaid this technology can be reconstructed, and its possible to show how some definitions received attention and others not, and how some became, and remained, dominant. During the process of problem definition, views compete, agendas are built, resources are allocated, and boundaries are created and maintained between 'inside' and 'outside world'. This is a political process, and by heuristically using concepts from political science and recent technology studies, the Political Construction of US radioactive waste disposal technologically can be reconstructed. (author). 301 refs.; 3 figs.; 15 tabs

  5. Causes of Construction Delays in Qatar Construction Projects

    OpenAIRE

    Murat Gunduz; Mohanad H. A. AbuHassan

    2016-01-01

    Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction ...

  6. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  7. Sustainable Construction Risk Perceptions in the Kuwaiti Construction Industry

    Directory of Open Access Journals (Sweden)

    Dalya Ismael

    2018-06-01

    Full Text Available Sustainable construction is fundamentally different than traditional construction because it requires whole systems thinking, early collaboration across stakeholders, and core principles like reducing resource consumption, eliminating toxins, and applying life cycle costing. Construction professionals unfamiliar with this mindset and approach may perceive sustainable construction as risky. One of the global regions in need of more sustainable construction is the Middle Eastern and North African (MENA region. The MENA region is one of the fastest developing in the world. However, it is the slowest one in implementing sustainable construction practices. Kuwait, in particular, contributes 53% more carbon emissions per capita than the United States. To understand how the Kuwaiti construction industry perceives risks associated with more sustainable construction, a survey was developed with 52 risk elements in which 131 industry professionals responded. The results indicate that industry professionals perceive a lack of public awareness as the risk element with the highest probability of occurrence. The risk element with the highest possible negative impact on future projects is designers’ and contractors’ inexperience with sustainable construction. Other risks were found to include a high initial cost for materials and overall project costs. Educational interventions, changes in risk allocation, and behavioral science to reframe upfront costs as long-term savings are offered as possible solutions.

  8. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    There is no single satisfactory way to measure productivity in the construction industry. The industry is too varied, too specialized and too dependent upon vast numbers of interrelations between trades, contractors, designers and owners. Hence, no universally reliable indices for measuring construction productivity has been developed. There are problems that are generic to all large union-built nuclear power plants. The actions of any one owner cannot rectify the shortcomings of the construction industry. The generic problems are being identified, and many national organizations are attempting to make the construction industry more productive by recommending various changes

  9. Diversity-based reasoning in children.

    Science.gov (United States)

    Heit, E; Hahn, U

    2001-12-01

    One of the hallmarks of inductive reasoning by adults is the diversity effect, namely that people draw stronger inferences from a diverse set of evidence than from a more homogenous set of evidence. However, past developmental work has not found consistent diversity effects with children age 9 and younger. We report robust sensitivity to diversity in children as young as 5, using everyday stimuli such as pictures of objects with people. Experiment 1 showed the basic diversity effect in 5- to 9-year-olds. Experiment 2 showed that, like adults, children restrict their use of diversity information when making inferences about remote categories. Experiment 3 used other stimulus sets to overcome an alternate explanation in terms of sample size rather than diversity effects. Finally, Experiment 4 showed that children more readily draw on diversity when reasoning about objects and their relations with people than when reasoning about objects' internal, hidden properties, thus partially explaining the negative findings of previous work. Relations to cross-cultural work and models of induction are discussed. Copyright 2001 Academic Press.

  10. MODULAR CONSTRUCTION SYSTEM EVALUATION

    International Nuclear Information System (INIS)

    Gillespie, S.

    2002-01-01

    The purpose of this study is to respond to U.S. Department of Energy (DOE) Technical Direction Letter (TDL) 02-003 (Waisley 2001), which directs Bechtel SAIC Company, LLC (BSC) to complete a design study to recommend repository design options to support receipt and/or emplacement of any or all of the following: commercial spent nuclear fuel (CSNF), high-level radioactive waste (HLW), DOE-managed spent nuclear fuel (DSNF) (including naval spent nuclear fuel [SNF]), and immobilized plutonium (if available), as soon as practicable, but no later than 2010. From the possible design options, a recommended approach will be determined for further evaluation to support the preliminary design of the repository. This study integrates the results of the repository Design Evolution Study (Rowe 2002) with supporting studies concerning national transportation options (BSC 2002b) and Nevada transportation options (Gehner 2002). The repository Design Evolution Study documents the processes used to reevaluate the design, construction, operation, and cost of the repository in response to TDL 02-003 (Waisley 2001), and to determine possible repository conceptual design options. The transportation studies evaluate the national and Nevada transportation options that support the repository conceptual design options. An evaluation methodology was established, based on Program-level requirements developed for the study in reference BSC 2001a, to allow the repository and system design options to be evaluated on a consistent basis. The transportation options and the design components were integrated into system design implementation options, which were evaluated using receipt and emplacement scenarios. The scenarios tested the ability of the design concept to adapt to changes in funding, waste receipt rate, and Nevada rail transportation availability. The results of the evaluation (in terms of system throughput, cost, and schedule) were then compared to the Program-level requirements, and

  11. Grammatical Constructions as Relational Categories.

    Science.gov (United States)

    Goldwater, Micah B

    2017-07-01

    This paper argues that grammatical constructions, specifically argument structure constructions that determine the "who did what to whom" part of sentence meaning and how this meaning is expressed syntactically, can be considered a kind of relational category. That is, grammatical constructions are represented as the abstraction of the syntactic and semantic relations of the exemplar utterances that are expressed in that construction, and it enables the generation of novel exemplars. To support this argument, I review evidence that there are parallel behavioral patterns between how children learn relational categories generally and how they learn grammatical constructions specifically. Then, I discuss computational simulations of how grammatical constructions are abstracted from exemplar sentences using a domain-general relational cognitive architecture. Last, I review evidence from adult language processing that shows parallel behavioral patterns with expert behavior from other cognitive domains. After reviewing the evidence, I consider how to integrate this account with other theories of language development. Copyright © 2017 Cognitive Science Society, Inc.

  12. Construction Safety Forecast for ITER

    Energy Technology Data Exchange (ETDEWEB)

    cadwallader, lee charles

    2006-11-01

    The International Thermonuclear Experimental Reactor (ITER) project is poised to begin its construction activity. This paper gives an estimate of construction safety as if the experiment was being built in the United States. This estimate of construction injuries and potential fatalities serves as a useful forecast of what can be expected for construction of such a major facility in any country. These data should be considered by the ITER International Team as it plans for safety during the construction phase. Based on average U.S. construction rates, ITER may expect a lost workday case rate of < 4.0 and a fatality count of 0.5 to 0.9 persons per year.

  13. Document management in engineering construction

    International Nuclear Information System (INIS)

    Liao Bing

    2008-01-01

    Document management is one important part of systematic quality management, which is one of the key factors to ensure the construction quality. In the engineering construction, quality management and document management shall interwork all the time, to ensure the construction quality. Quality management ensures that the document is correctly generated and adopted, and thus the completeness, accuracy and systematicness of the document satisfy the filing requirements. Document management ensures that the document is correctly transferred during the construction, and various testimonies such as files and records are kept for the engineering construction and its quality management. This paper addresses the document management in the engineering construction based on the interwork of the quality management and document management. (author)

  14. Constructive Memory: Past and Future

    OpenAIRE

    Schacter, Daniel L.

    2012-01-01

    Human memory is not a literal reproduction of the past, but instead relies on constructive processes that are sometimes prone to error and distortion. Understanding of constructive memory has accelerated during recent years as a result of research that has linked together its cognitive and neural bases. This article focuses on three aspects of constructive memory that have been the target of recent research: (i) the idea that certain kinds of memory distortions reflect the operation of adapti...

  15. ABWR construction experience in Japan

    International Nuclear Information System (INIS)

    Kawahata, Junichi; Miura, Jun; Saito, Fuyuki; Mori, Hiroya

    2003-01-01

    The construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and 7 (K6 and 7) owned by Tokyo Electric Power Company (TEPCO), have been in service since November 1996 and September 1997 respectively, and are the first ABWRs in the world. Hitachi, Ltd. and Toshiba Corporation took part in the projects and achieved safety construction in 52- month schedule from rock inspection to turnover in cooperation with TEPCO and other contractors with broad experience in BWRs. Taking advantage of experience of the Kashiwazaki construction, the ABWR construction methods realize to satisfy with requests from electric power companies and to fit site conditions. The Chubu Electric Power Company's Hamaoka Nuclear Power Station Unit No. 5 (Hamaoka 5) and Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2), which are ABWRs, completed rock inspection in May 2000 and June 2001 respectively, and are under construction. The ABWR construction methods are proved their validity through four actual construction projects. Safe constructions with the highest quality have been advanced thus further aiming at the introduction of the latest technologies and contributing to reduce plant construction costs and also to shorten schedule. (author)

  16. Constructing leadership identities through stories

    DEFF Research Database (Denmark)

    Frimann, Søren; Hersted, Lone

    2016-01-01

    This article analyzes the construction of leadership identities through stories found in four narrative interviews from a qualitative study and leadership development project based on social constructionism and action learning. We argue that leadership development and the construction of leadership...... that the concept of coauthoring is useful in developing leadership and leadership identities through reflexive dialogs and emerging stories....... identities in a postmodern paradigm are based on the negotiation and co-construction of meanings, relationships, and stories. The following questions are investigated: What happens when a group of leaders from different organizations construct, deconstruct, and reconstruct their identity as leaders through...

  17. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  18. Constructive Dimension and Turing Degrees

    OpenAIRE

    Bienvenu, Laurent; Doty, David; Stephan, Frank

    2007-01-01

    This paper examines the constructive Hausdorff and packing dimensions of Turing degrees. The main result is that every infinite sequence S with constructive Hausdorff dimension dim_H(S) and constructive packing dimension dim_P(S) is Turing equivalent to a sequence R with dim_H(R) 0. Furthermore, if dim_P(S) > 0, then dim_P(R) >= 1 - epsilon. The reduction thus serves as a *randomness extractor* that increases the algorithmic randomness of S, as measured by constructive dimension. A number of...

  19. Design Processes and Constructive Ergonomics

    DEFF Research Database (Denmark)

    Broberg, Ole

    2015-01-01

    This paper discusses some central issues in the concept of constructive ergonomics. It does so by reflecting on experiences from ergonomics intervention projects carried out in Denmark. Constructive ergonomics has a huge potential as a new way to go for ergonomics research and practice. However, ...

  20. High voltage power network construction

    CERN Document Server

    Harker, Keith

    2018-01-01

    This book examines the key requirements, considerations, complexities and constraints relevant to the task of high voltage power network construction, from design, finance, contracts and project management to installation and commissioning, with the aim of providing an overview of the holistic end to end construction task in a single volume.

  1. New Ideas for School Construction.

    Science.gov (United States)

    Producers' Council, Inc., Washington, DC.

    Present educators, architects, engineers, and building product manufacturers with a medium of common interest for discussion of mutual school construction problems, objectives, needs, ideas, capabilities and limitations. Contents include--(1) modern wood construction, (2) school room in a steel mill, (3) masonry in new school design, (4) the…

  2. Barriers of lean construction implementation in the Moroccan construction industry

    Science.gov (United States)

    Bajjou, Mohamed Saad; Chafi, Anas

    2018-04-01

    Improving the production system performance has become a fundamental pillar that must be taken into consideration in the construction industry. Recent developments in the construction sector have led to renewed interest in new techniques of management. Lean Construction is a very effective approach that has gained a high popularity by its ability to eliminate waste and maximize the value for the customer. Although both developed and developing countries have gained large benefits by implementing Lean Construction approach, several experiences showed many barriers that are hindering its implementation especially in developing countries. This paper aims to assess the critical barriers to the successful implementation in the Moroccan construction industry. Based on a literature review, followed by an analysis of data collected from a questionnaire survey which targeted 330 practitioners in the Moroccan construction field, several barriers were identified as key barriers. The findings of this investigation revealed that there are significant barriers such as Lack of knowledge about Lean Construction concepts, Unskilled Human Resources, and insufficient financial resources.

  3. Construction method for plant facility

    International Nuclear Information System (INIS)

    Ito, Arata; Hirono, Hideharu; Kyoda, Shigeru; Hanawa, Minoru; Sato, Hitoshi

    1998-01-01

    A caisson structure is disposed on a construction site for facilities of nuclear power plants. A digging work is performed below the caisson structure and, simultaneous with the digging work, a construction of a base, construction of plant facilities including a building and installation of plant facility are performed on the caisson structure. Then, the caisson structure is sank together with the structures on a base rock in association with the progress of the digging work and secured on the base rock. When securing them on the base rock, a groove is formed to the base rock along tuyere of the caisson structure so that the tuyere and a ceiling portion of the caisson structure are in direct contact with the base rock. Since the construction for the containing building conducted on the caisson structure is performed simultaneous with the digging work conducted below the caisson structure, the term required for the construction of the plant facilities can greatly reduced. (N.H.)

  4. Statics of historic masonry constructions

    CERN Document Server

    Como, Mario

    2016-01-01

    This successful book, which is now appearing in its second edition, presents a comprehensive new Statics of Masonry Constructions. Masonry constructions are the great majority of the buildings in Europe’s historic centres and the most important monuments in its architectural heritage. Given the age of these constructions, the demand for safety assessments and restoration projects is pressing and constant. The book you hold in hands contributes to fill this demand. The second edition integrates the original text of the first edition with new developments, widening and revisions, due to recent research studies achievements. The result is a book that gives a complete picture of the behaviour of the Masonry Constructions. First of all, it gives the fundamentals of its Statics, based on the no-tension assumption, and then it develops the Limit Analysis for the Masonry Constructions. In this framework, through an interdisciplinary approach combining Engineering and Architecture, the book also investigates the sta...

  5. CRITICAL EVENTS IN CONSTRUCTION PROCESS

    DEFF Research Database (Denmark)

    Jørgensen, Kirsten; Rasmussen, Grane Mikael Gregaard

    2009-01-01

    cause-effects of failures and defects in the construction industry by using an analytical approach (The bowtie model) which is developed in the accident research. Using this model clarifies the relationships within the chain of failures that causes critical events with undesirable consequences......Function failures, defects and poor communication are major problems in the construction industry. These failures and defects are caused by a row of critical events in the construction process. The purpose of this paper is to define “critical events” in the construction process and to investigate....... In this way the causes of failures and the relationships between various failures are rendered visible. A large construction site was observed from start to finish as the empirical element in the research. The research focuses on all kinds of critical events identified throughout every phase during...

  6. Combinatorial designs constructions and analysis

    CERN Document Server

    Stinson, Douglas R

    2004-01-01

    Created to teach students many of the most important techniques used for constructing combinatorial designs, this is an ideal textbook for advanced undergraduate and graduate courses in combinatorial design theory. The text features clear explanations of basic designs, such as Steiner and Kirkman triple systems, mutual orthogonal Latin squares, finite projective and affine planes, and Steiner quadruple systems. In these settings, the student will master various construction techniques, both classic and modern, and will be well-prepared to construct a vast array of combinatorial designs. Design theory offers a progressive approach to the subject, with carefully ordered results. It begins with simple constructions that gradually increase in complexity. Each design has a construction that contains new ideas or that reinforces and builds upon similar ideas previously introduced. A new text/reference covering all apsects of modern combinatorial design theory. Graduates and professionals in computer science, applie...

  7. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  8. Evaluation of a participatory ergonomics intervention in small commercial construction firms.

    Science.gov (United States)

    Dale, Ann Marie; Jaegers, Lisa; Welch, Laura; Gardner, Bethany T; Buchholz, Bryan; Weaver, Nancy; Evanoff, Bradley A

    2016-06-01

    Work-related musculoskeletal disorders (WMSD) among construction workers remain high. Participatory ergonomics (PE) interventions that engage workers and employers in reducing work injury risks have shown mixed results. Eight-six workers from seven contractors participated in a PE program. A logic model guided the process evaluation and summative evaluation of short-term and intermediate impacts and long-term outcomes from surveys and field records. Process measures showed good delivery of training, high worker engagement, and low contractor participation. Workers' knowledge improved and workers reported changes to work practices and tools used; contractor provision of appropriate equipment was low (33%). No changes were seen in symptoms or reported physical effort. The PE program produced many worker-identified ergonomic solutions, but lacked needed support from contractors. Future interventions should engage higher levels of the construction organizational system to improve contractor involvement for reducing WMSD. Am. J. Ind. Med. 59:465-475, 2016. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  9. Workshop presentation: research guidelines for Construction Management

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1 Construction management: tools and methods to manage construction projects 2 environmental impact of construction projects 3 construction management and safety 4 project procurement 5 construction management for major public works & complex projects

  10. Case inflection of construct state constructions in Dinka

    DEFF Research Database (Denmark)

    Andersen, Torben

    2016-01-01

    Dinka, a Nilo-Saharan language, is largely monosyllabic, but nevertheless it has a fairly rich morphology. Thus, most of its morphology is expressed by alternations in phonological material of the root. The inflectional categories of nouns manifested in this way include state and case in addition...... to number. The state category consists of an absolute state and two construct states. The case category includes a nominative, a genitive, an allative, and an essive/ablative. The present article shows how case inflection is manifested in complex noun phrases consisting of a noun in a construct state...... simultaneously carry state information and case information. Thus, the case inflection of construct state constructions in Dinka adds yet another layer of nonlinear morphology to nouns in this language....

  11. design and construction of design and construction of pilot scale

    African Journals Online (AJOL)

    eobe

    construction of the extractor, evaporator, condensate receiver and the the extractor, evaporator ... The concept of overall heat transfer coefficient was adopted for calculating the heat ..... Evaporator. Residence time for evaporation = 14070.25s.

  12. Safety in construction industry - overview

    International Nuclear Information System (INIS)

    Chockalingam, S.; Nehru, R.M.; Ramprasad, K.; Sonawane, A.U.

    2016-01-01

    The construction industry plays an important role in the social and economic development in a country. Safety in the construction industry is considered a major issue in developed and developing countries. In urban sector of India increasing numbers of workers have taken up construction work as a means of immediate employment, which provides cash earnings at the end of the day. Being as unorganized sector, the fatal injuries in DAE unit for the construction industry (Nuclear Power Project including BHAVINI: 62.7% from 1999 to 2014) is higher than the category for all other units (UCIL:13.3%; ECIL:6.7%; NFC and ZC: 4%; HWP: 2.7%; IREL:2.7%; Nuclear Power Plant: 2.7% etc., from 1999 to 2014). A variety hazards exist in the construction site. The best way to protect workers against workers against hazards is to control problems at the source. The problem regarding construction industry is not that the hazards and risks are unknown, but it very difficult to accurately identify in a constantly changing work environment. To prevent hazards at work, all possible hazards that may be encountered should be identified in advance through Job Hazard Analysis (JHA). The present scenario has deduced a fact that efficient Safety Management Techniques (SMT) are (essential for today's construction companies and adaptation of legal requirements including regulatory requirements and proactive safety management techniques will help organizations in providing a better workplace to its employees and reduce the accidents. (author)

  13. Constructibility assessment of APR1400

    International Nuclear Information System (INIS)

    Cho, Sung Jae; Kang, Yong Chul; Lee, Jae Gon; Lim, Woo Sang

    2003-01-01

    APR1400 (formerly KNGR) development is one of national G-7 projects sponsored by government and KHNP (Korea Hydro and Nuclear Power Co., LTD). It is an evolutionary standard reactor with the thermal output of 4000MWt and has been adopted for Shin-Kori Unit 3 and 4. The government organizations, research institutes, universities and industries have participated in the project since 1992 along with KHNP, and the standard design certification program was issued in May 2002. The project set up the top-tier requirements about the safety, economy, operability and maintainability, and constructibility in the early design stage. The requirements have been evaluated periodically during the design process, and the results were reflected to the design. This paper describes the methods for constructibility enhancement and the results of schedule analysis to assure meeting construction duration target, which is set to 48 months from the first concrete pouring to the commercial operation on the condition that learning effects are maximized at Nth plant. To meet the target schedule, the design characteristics and constructibility studies such as new construction methods and construction schedule analysis were performed. The new construction methods presented here are over the top method for NSSS components, deck plate and steel from for concrete wall and slab, automatic welding for large bore piping, and modularization of components and structure, etc. (author)

  14. Collapse simulation of building constructions

    Directory of Open Access Journals (Sweden)

    Nekrest'yanov Viktor Nikolaevich

    Full Text Available The physical reasons for building structures destruction are both the forces arising at stress-strain state of construction elements and external influences arising at emergency situations, as well as their moments, impulses and periodic impulses with the frequencies close to of fluctuations frequencies of construction elements. We shall call the mathematical calculation models for the parameters-reasons of destructions the basic models. The basic models of destruction of building structures elements allow not only providing necessary level of reliability and survivability of the elements and the construction as a whole already at the stage of their design, but also giving the chance, at their corresponding completion, to provide rational decisions on the general need of recovery works and their volume depending on destruction level. Especially important for rational design decisions development, which ensure the demanded constructional safety of building structures, is library creation of the basic mathematical models of standard processes of bearing elements destructions for standard construction designs for the purpose of the further forecast (assessment of the level and probabilities of standard destructions. Some basic mathematical models of destructions processes of the standard elements of building structures are presented in the present article. A model of accounting for construction defects and a model of obtaining requirements to probabilities of partial destructions of a construction are given. Both of these models are probabilistic.

  15. A theory of construction management?

    Directory of Open Access Journals (Sweden)

    Gerard de Valence

    2012-09-01

    Full Text Available The links between theory and construction management (CM, and for that matter construction economics (CE, are not strong (see de Valence 2011. This may be one of the reasons why they have not gained complete acceptance as academic disciplines and are not seen as distinct branches of economics and management respectively. Another reason may be that products and production (the focus of management and economic theories respectively are not the same as projects and project management in general, and construction projects and CM in particular.

  16. Passive-solar construction handbook

    Energy Technology Data Exchange (ETDEWEB)

    Levy, E.; Evans, D.; Gardstein, C.

    1981-02-01

    Many of the basic elements of passive solar design are reviewed. Passive solar construction is covered according to system type, each system type discussion including a general discussion of the important design and construction issues which apply to the particular system and case studies illustrating designed and built examples of the system type. The three basic types of passive solar systems discussed are direct gain, thermal storage wall, and attached sunspace. Thermal performance and construction information is presented for typical materials used in passive solar collector components, storage components, and control components. Appended are an overview of analysis methods and a technique for estimating performance. (LEW)

  17. Animated construction of line drawings

    KAUST Repository

    Fu, Hongbo; Zhou, Shizhe; Liu, Ligang; Mitra, Niloy J.

    2011-01-01

    system produces plausible animated constructions of input line drawings, with no or little user intervention. We test our algorithm on a range of input sketches, with varying degree of complexity and structure, and evaluate the results via a user study

  18. Use sulfoferritic cements in construction

    Science.gov (United States)

    Samchenko, Svetlana V.; Zorin, Dmitriy A.

    2018-03-01

    Currently, high-rise construction has received increasing attention around the world. In the big cities under construction is less space and one solution is the high-rise construction. However, high-rise buildings use special requirements, such as strength, thermal insulation, wind load and others. When concrete is exposed to continuous loads by wind or to mechanical loads, it undergoes abrasion. Resistance to this process depends on the characteristics of materials that the concrete and finishing seams are made of. Research on increasing impact and abrasion resistance of calcium sulfoferrite-based cement stone from the perspective of formation of cement stone structure will be instrumental in developing durable materials for application in high-rise construction.

  19. Constructive memory: past and future.

    Science.gov (United States)

    Schacter, Daniel L

    2012-03-01

    Human memory is not a literal reproduction of the past, but instead relies on constructive processes that are sometimes prone to error and distortion. Understanding of constructive memory has accelerated during recent years as a result of research that has linked together its cognitive and neural bases. This article focuses on three aspects of constructive memory that have been the target of recent research: (i) the idea that certain kinds of memory distortions reflect the operation of adaptive cognitive processes that contribute to the efficient functioning of memory; (ii) the role of a constructive memory system in imagining or simulating possible future events; and (iii) differences between true and false memories that have been revealed by functional neuroimaging techniques. The article delineates the theoretical implications of relevant research, and also considers some clinical and applied implications.

  20. The Great Hydrometer Construction Contest!

    Science.gov (United States)

    McGinnis, James Randy; Padilla, Michael J.

    1991-01-01

    The relationship between specific gravity, salinity, and density in brine solutions is investigated. Students construct hydrometers to reinforce concepts learned in oceanography. Background information, salt requirements for the unknowns, directions, and reproducible worksheets are included. (KR)

  1. Constructive Conflict in Academic Bargaining.

    Science.gov (United States)

    Birnbaum, Robert

    1980-01-01

    Collective bargaining is seen as a process of shared authority used in some institutions to manage conflict. Some ways in which parties to bargaining can significantly alter their relationships to promote constructive and creative outcomes of conflict are suggested. (MLW)

  2. Sequential Construction of Costly Networks

    Energy Technology Data Exchange (ETDEWEB)

    Gutfraind, Alexander [Los Alamos National Laboratory

    2011-01-01

    Natural disasters or attacks often disrupt infrastructure networks requiring a costly recovery. This motivates an optimization problem where the objecitve is to construct the nodes of a graph G(V;E), and the cost of each node is dependent on the number of its neighbors previously constructed, or more generally, any properties of the previously-completed subgraph. In this optimization problem the objective is to find a permutation of the nodes which results in the least construction cost. We prove that in the case where the cost of nodes is a convex function in the number of neighbors, the optimal construction sequence is to start at a single node and move outwards. We also introduce algorithms and heuristics for solving various instances of the problem. Those methods can be applied to help reduce the cost of recovering from disasters as well as to plan the deployment of new network infrastructure.

  3. IRT-based test construction

    OpenAIRE

    van der Linden, Willem J.; Theunissen, T.J.J.M.; Boekkooi-Timminga, Ellen; Kelderman, Henk

    1987-01-01

    Four discussions of test construction based on item response theory (IRT) are presented. The first discussion, "Test Design as Model Building in Mathematical Programming" (T.J.J.M. Theunissen), presents test design as a decision process under certainty. A natural way of modeling this process leads to mathematical programming. General models of test construction are discussed, with information about algorithms and heuristics; ideas about the analysis and refinement of test constraints are also...

  4. Construct Measurement in Management Research

    DEFF Research Database (Denmark)

    Nielsen, Bo Bernhard

    2014-01-01

    Far too often do management scholars resort to crude and often inappropriate measures of fundamental constructs in their research; an approach which calls in question the interpretation and validity of their findings. Scholars often legitimize poor choices in measurement with a lack of availability......, this research note raises important questions about the use of proxies in management research and argues for greater care in operationalizing constructs with particular attention to matching levels of theory and measurement....

  5. Constructing a modern city machine

    DEFF Research Database (Denmark)

    Lindegaard, Hanne; Jørgensen, Ulrik

    1998-01-01

    Based on the Copenhagen sewers debates and constructions the role of changing perceptions of water, hygiene and environment is discussed in relation to the modernisation of cities by machinating flows and infrastructures.......Based on the Copenhagen sewers debates and constructions the role of changing perceptions of water, hygiene and environment is discussed in relation to the modernisation of cities by machinating flows and infrastructures....

  6. Design Processes and Constructive Ergonomics

    OpenAIRE

    Broberg, Ole

    2015-01-01

    This paper discusses some central issues in the concept of constructive ergonomics. It does so by reflecting on experiences from ergonomics intervention projects carried out in Denmark. Constructive ergonomics has a huge potential as a new way to go for ergonomics research and practice. However, many challenges are to be overcome. They relate among others to education and training of ergonomist, and the cultural and institutional setting of ergonomics in specific countries.

  7. Green Construction in Building Renovation

    Directory of Open Access Journals (Sweden)

    Ksit Barbara

    2016-06-01

    Full Text Available Modern materials and construction solutions draw more and more attention to ecology and building certification. Among the criteria appearing in revitalization, an important element is bringing plants back into heavily urbanized areas. In its natural form, this is not possible to carry out everywhere, often requiring large amounts of space. Nowadays, however, there are a number of green roofs and green wall systems, allowing “greener” construction without making significant changes in the urban environment.

  8. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  9. Modern optimization in earthwork construction

    OpenAIRE

    Parente, Manuel; Correia, A. Gomes; Cortez, Paulo

    2015-01-01

    Earthworks tasks are often regarded in transportation projects as some of the most demanding processes. In fact, sequential tasks such as excavation, transportation, spreading and compaction are strongly based on heavy mechanical equipment and repetitive processes, thus becoming as economically demanding as they are time-consuming. Moreover, actual construction requirements originate higher demands for productivity and safety in earthwork constructions. Given the percentual weight of costs an...

  10. Housing and construction chapter 11

    Science.gov (United States)

    Delton Alderman

    2015-01-01

    Highlights •The new residential and renovation construction markets in the US and the Eurozone were valued at $338.7 billion (305.5 billion euros) and $673.3 billion dollars (614.4 billion euros), respectively, in 2014. •In Europe, 55% of the value of the new residential and renovation construction markets in 2014 was in...

  11. Organizational analysis of construction projects

    OpenAIRE

    Hughes, Will

    1989-01-01

    This research project is about the analysis of construction project organizations. The work is based on organizational theory and is a development of Linear Responsibility Analysis (LRA). The aim is to assess the extent to which project success is affected by organizational structure. The analysis of four public sector case studies raises several issues. First is the need for a systematic model of describing and analysing construction project environments. A framework has been developed that ...

  12. ConStruct: Improved construction of RNA consensus structures

    Directory of Open Access Journals (Sweden)

    Steger Gerhard

    2008-04-01

    Full Text Available Abstract Background Aligning homologous non-coding RNAs (ncRNAs correctly in terms of sequence and structure is an unresolved problem, due to both mathematical complexity and imperfect scoring functions. High quality alignments, however, are a prerequisite for most consensus structure prediction approaches, homology searches, and tools for phylogeny inference. Automatically created ncRNA alignments often need manual corrections, yet this manual refinement is tedious and error-prone. Results We present an extended version of CONSTRUCT, a semi-automatic, graphical tool suitable for creating RNA alignments correct in terms of both consensus sequence and consensus structure. To this purpose CONSTRUCT combines sequence alignment, thermodynamic data and various measures of covariation. One important feature is that the user is guided during the alignment correction step by a consensus dotplot, which displays all thermodynamically optimal base pairs and the corresponding covariation. Once the initial alignment is corrected, optimal and suboptimal secondary structures as well as tertiary interaction can be predicted. We demonstrate CONSTRUCT's ability to guide the user in correcting an initial alignment, and show an example for optimal secondary consensus structure prediction on very hard to align SECIS elements. Moreover we use CONSTRUCT to predict tertiary interactions from sequences of the internal ribosome entry site of CrP-like viruses. In addition we show that alignments specifically designed for benchmarking can be easily be optimized using CONSTRUCT, although they share very little sequence identity. Conclusion CONSTRUCT's graphical interface allows for an easy alignment correction based on and guided by predicted and known structural constraints. It combines several algorithms for prediction of secondary consensus structure and even tertiary interactions. The CONSTRUCT package can be downloaded from the URL listed in the Availability and

  13. Nuclear power plant containment construction

    International Nuclear Information System (INIS)

    Schabert, H.P.; Danisch, R.; Strickroth, E.

    1975-01-01

    The Nuclear Power Plant Containment Construction includes the spherical steel safety enclosure for the reactor and the equipment associated with the reactor and requiring this type of enclosure. This steel enclosure is externally structurally protected against accident by a concrete construction providing a foundation for the steel enclosure and having a cylindrical wall and a hemispherical dome, these parts being dimensioned to form an annular space surrounding the spherical steel enclosure, the latter and the concrete construction heretofore being concentrically arranged with respect to each other. In the disclosed construction the two parts are arranged with their vertical axis horizontally offset from each other so that opposite to the offsetting direction of the concrete construction a relatively large space is formed in the now asymmetrical annular space in which reactor auxiliary equipment not requiring enclosure by the steel containment vessel or safety enclosure, may be located outside of the steel containment vessel and inside of the concrete construction where it is structurally protected by the latter

  14. Constructed wetlands : the Canadian context

    Energy Technology Data Exchange (ETDEWEB)

    Speer, S.; Champagne, P. [Queen' s Univ., Kingston, ON (Canada). Dept. of Civil Engineering

    2006-07-01

    Large volumes of wastewater from livestock and production facilities must be treated to minimize the contamination of waterways in agricultural areas. This paper investigated the use of constructed wetlands as a lower-cost and efficient method of treating agricultural wastewaters. The study found that while constructed wetlands required limited maintenance, temperature dependency of the constructed wetlands systems is a limiting factor in their widespread implementation. Lower operating temperatures are only overcome by constructing larger wetlands systems, which require a substantial amount of land. The Canadian climate poses significant challenges to the implementation of constructed wetlands, which become inoperative during winter months. Plants and bacteria normally become dormant or die during winter months, which can create a lag in wetland treatment during the initial months of operation in the Spring. Snowmelt and added rainfall in the Spring can also create a high flow within the wetland cells, as many constructed wetlands rely on runoff as a feed source. Washout of bacteria can occur. Wastewater storage systems or further engineering of the wetlands may be required. It was concluded that insulating wetland cells will maintain a warmer operating temperature, while the addition of an aeration system will increase the treatment efficiency of the wetland during winter months. 17 refs., 5 tabs., 2 figs.

  15. Workshop presentation: research guidelines for Construction Management

    OpenAIRE

    Marco Alvise Bragadin

    2013-01-01

    Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1) Construction management: tools and methods to manage construction projects 2) environmental impact of construction projects 3) construction management and safety 4) project p...

  16. Conceptual Model for Systematic Construction Waste Management

    OpenAIRE

    Abd Rahim Mohd Hilmi Izwan; Kasim Narimah

    2017-01-01

    Development of the construction industry generated construction waste which can contribute towards environmental issues. Weaknesses of compliance in construction waste management especially in construction site have also contributed to the big issues of waste generated in landfills and illegal dumping area. This gives sign that construction projects are needed a systematic construction waste management. To date, a comprehensive criteria of construction waste management, particularly for const...

  17. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  18. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)

  19. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  20. National construction, Denmark. Flat roofs

    Energy Technology Data Exchange (ETDEWEB)

    Rode, C

    1995-04-01

    The Paris meeting of IEA Annex 24 (held in the spring of 1991) declared a set of typical building constructions, the Heat, Air and Moisture characteristics of which should be dealt with as part of the Annex work. Each type of construction was assigned to one or more countries as their National Construction, and it has been the responsibility of each country to prepare a report on what may be regarded as common knowledge in the country on the hygrothermal behaviour of their construction. This knowledge is in part due to experimental work carried out by research bodies in the countries, and due to experience form practice. This report has two main sections: Section 2 gives a general overview of the design of the most common variants of flat roofs and common knowledge reported for such roofs. Section 3 gives an account of research projects carried out in Denmark on flat roofs to analyze their hygrothermal performance. Whenever possible, an emphasis will be put on the hygrothermal consequences of thermally insulating such constructions. (EG) 19 refs.

  1. Human Factors Simulation in Construction Management Education

    Science.gov (United States)

    Jaeger, M.; Adair, D.

    2010-01-01

    Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management…

  2. 48 CFR 22.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction. 22.804-2... Construction. (a) Construction contractors that hold a nonexempt (see 22.807) Government construction contract... affirmative action requirements that specify goals for minorities and women in covered construction trades...

  3. 50 CFR 29.21-5 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Construction. 29.21-5 Section 29.21-5... Construction. (a) If construction is not commenced within two (2) years after date of right-of-way grant, the...) Proof of construction: Upon completion of construction, the applicant shall file a certification of...

  4. 38 CFR 18.423 - New construction.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false New construction. 18.423... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... facility is readily accessible to and usable by handicapped persons, if the construction was commenced...

  5. 15 CFR 8b.18 - New construction.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false New construction. 8b.18 Section 8b.18... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... construction was commenced after the effective date of this part. (b) Alteration. Each facility or part of a...

  6. 10 CFR 1040.73 - New construction.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false New construction. 1040.73 Section 1040.73 Energy... § 1040.73 New construction. (a) Design and construction. Each facility or part of a facility constructed... the construction was commenced after the effective date of this subpart. (b) Alteration. Each facility...

  7. 23 CFR 660.113 - Construction.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 660.113 Section 660.113 Highways FEDERAL... (DIRECT FEDERAL) Forest Highways § 660.113 Construction. (a) No construction shall be undertaken on any FH... construction of FHs will be performed by the contract method, unless construction by the FHWA, the FS, or a...

  8. 45 CFR 84.23 - New construction.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false New construction. 84.23 Section 84.23 Public... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...

  9. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  10. 46 CFR 160.054-3 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.054-3 Section 160.054-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... Construction. (a) Construction. The container shall be constructed of tough transparent material, not less than...

  11. Effects of tailored neck-shoulder pain treatment based on a decision model guided by clinical assessments and standardized functional tests. A study protocol of a randomized controlled trial

    Directory of Open Access Journals (Sweden)

    Björklund Martin

    2012-05-01

    Full Text Available Abstract Background A major problem with rehabilitation interventions for neck pain is that the condition may have multiple causes, thus a single treatment approach is seldom efficient. The present study protocol outlines a single blinded randomised controlled trial evaluating the effect of tailored treatment for neck-shoulder pain. The treatment is based on a decision model guided by standardized clinical assessment and functional tests with cut-off values. Our main hypothesis is that the tailored treatment has better short, intermediate and long-term effects than either non-tailored treatment or treatment-as-usual (TAU on pain and function. We sub-sequentially hypothesize that tailored and non-tailored treatment both have better effect than TAU. Methods/Design 120 working women with minimum six weeks of nonspecific neck-shoulder pain aged 20–65, are allocated by minimisation with the factors age, duration of pain, pain intensity and disability in to the groups tailored treatment (T, non-tailored treatment (NT or treatment-as-usual (TAU. Treatment is given to the groups T and NT for 11 weeks (27 sessions evenly distributed. An extensive presentation of the tests and treatment decision model is provided. The main treatment components are manual therapy, cranio-cervical flexion exercise and strength training, EMG-biofeedback training, treatment for cervicogenic headache, neck motor control training. A decision algorithm based on the baseline assessment determines the treatment components given to each participant of T- and NT-groups. Primary outcome measures are physical functioning (Neck Disability Index and average pain intensity last week (Numeric Rating Scale. Secondary outcomes are general improvement (Patient Global Impression of Change scale, symptoms (Profile Fitness Mapping neck questionnaire, capacity to work in the last 6 weeks (quality and quantity and pressure pain threshold of m. trapezius. Primary and secondary outcomes will

  12. Statics of Historic Masonry Constructions

    CERN Document Server

    Como, Mario

    2013-01-01

    Masonry constructions are the great majority of the buildings in Europe’s historic centres and the most important monuments in its architectural heritage. Given the age of much of these constructions, the demand for safety assessments and restoration projects is pressing and constant. This book aims to help fill this demand presenting a comprehensive new statics of masonry constructions. The book, result of thirty years of research and professional experience, gives the fundamentals of statics of the masonry solid, then applied to the study of statics of arches, piers and vaults. Further, combining engineering and architecture and through an interdisciplinary approach, the book investigates the statical behaviour of many historic monuments, as the Pantheon, the Colosseum,  the domes of S. Maria del Fiore in Florence and of St. Peter in Rome, the Tower of Pisa, the Gothic Cathedrals and the Masonry Buildings under seismic actions.

  13. Constructing nature behind the glass

    Directory of Open Access Journals (Sweden)

    Samuel J.M.M. Alberti

    2008-07-01

    Full Text Available By way of introducing this special issue of Museum and Society, ‘Constructing nature behind glass’, this paper first surveys the literature devoted to analyses of natural history objects and collections. Such work is to be found in interesting places – not only in museum studies, history of science, and professional museum literature, but also in visual studies, anthropology and cultural geography. After exploiting this writing for different perspectives on the cultural and practical construction of museum nature, this paper moves on to consider one popular topic, taxidermy. The ambiguous nature of taxidermic mounts, or ‘remnant models’, leads to a discussion of the relative status of specimen and artefact. I identify four configurations of their relationship: museum nature as opposed to material culture; museum nature as material culture; museum nature and material culture sharing parallel processes; and finally, museum nature and material culture entangled. All offer perspectives on the construction of nature and culture behind glass.

  14. Algorithms for Decision Tree Construction

    KAUST Repository

    Chikalov, Igor

    2011-01-01

    The study of algorithms for decision tree construction was initiated in 1960s. The first algorithms are based on the separation heuristic [13, 31] that at each step tries dividing the set of objects as evenly as possible. Later Garey and Graham [28] showed that such algorithm may construct decision trees whose average depth is arbitrarily far from the minimum. Hyafil and Rivest in [35] proved NP-hardness of DT problem that is constructing a tree with the minimum average depth for a diagnostic problem over 2-valued information system and uniform probability distribution. Cox et al. in [22] showed that for a two-class problem over information system, even finding the root node attribute for an optimal tree is an NP-hard problem. © Springer-Verlag Berlin Heidelberg 2011.

  15. Architecture between construction and expression

    Directory of Open Access Journals (Sweden)

    Luca Lanini

    2015-11-01

    Full Text Available I think that the problem is basically the same as always: to redefine the relationship between Construction and Expression. On one hand, construction is considered an endeavor, on the other hand, a tendency to contest architecture only with expression. The relationship between architecture and control of urban phenomena is a relationship that has been gradually lost in the past three decades and has been replaced by the relationship between finance and planning. A useful object is very different from a building: for its time and costs of construction. Buildings are expected to last many years and are paid with everybody’s taxes, a design object’s lifespan is perhaps fifty years, then it’s ready to be modernized or for the landfill ... I believe that the main tool that a designer must have, beyond necessary technical skills, is the capacity of his/her own critical thought.

  16. Statics of historic masonry constructions

    CERN Document Server

    Como, Mario

    2017-01-01

    Masonry constructions are the great majority of the buildings in Europe’s historic centres and the most important monuments of its architectural heritage. Given the age of these constructions, the demand for safety assessments and restoration projects is pressing and constant; still within the broad studies in the subject it is not yet recognised, in particular within the seismic area, a unitary approach to deal with Masonry structures. This successful book contributes to clarify the issues with a rigorous approach offering a comprehensive new Statics of Masonry Constructions. This third edition has been driven by some recent developments of the research in the field, and it gives the fundamentals of Statics with an original and rigorous mathematical formulation, further in-depth inquired in this new version. With many refinements and improvements, the book investigates the static behaviour of many historic monuments, such as the Gothic Cathedrals, the Mycenaean Tholoi, the Pantheon, the Colosseum, the dome...

  17. ATLAS construction: A status report

    CERN Document Server

    Sfyrla, Anna

    2006-01-01

    ATLAS is a general purpose p-p collider detector being constructed for the CERN Large Hadron Collider (LHC). It is located in one of the two high luminosity bunch crossing points (peak luminosity of 1 0 3 4 c m - 2 s _ 1 ) of the LHC. It consists of 3 main sections. Located close to the beam axis, the tracking system employs pixel detectors, silicon microstrip modules and transition radiation straws, all within a 2 Tesla superconducting solenoid. The tracker is surrounded by the electromagnetic and hadronic calorimeters. In the outer part of the detector, 8 superconducting coils define an open toroidal magnetic field for muon detection. The construction status of the ATLAS detector towards being ready for the first collisions in 2007 will be presented, with particular emphasis on the construction and projected performance of the tracking system.

  18. Applications of constructive logic to sheaf constructions in toposes

    NARCIS (Netherlands)

    Vries, F.-J. de

    1987-01-01

    The internal logic of a topos is exploited to give an easy proof of the fact that topologies in a topos form a locale and to give simple internal reformulations of two well-known variants of associated sheaf constructions. We have two applications: (i) we extend Gödel's negative translation to a

  19. PRIORITISING LEAN CONSTRUCTION BARRIERS IN UGANDA'S CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Henry Mwanaki Alinaitwe

    2009-06-01

    Full Text Available Engaging in lean construction efforts could prove to be highly rewarding for building firms in Uganda. However, lean construction is risky and can be disastrous if not properly managed. Lean production efforts in some other countries have not been successful due to the many barriers to its successful implementation. To enable sound lean construction efforts and to increase the chances of success in eliminating waste, a thorough investigation of the barriers is essential. This study presents 31 barriers and investigates their influence (strength on the success of lean construction initiatives. Structured interviews were carried out with technical managers of building firms to assess their perception of the barriers to lean production based on their experience at their firms. The strongest barrier is the provision of inputs exactly when required. Additionally, the barriers were ranked according to the ease of overcoming each. The easiest barrier to overcome is keeping the required items in the right place. Finally, a graphical aid is provided to enable decision makers to concentrate their efforts on the influential (strong, yet easy to overcome barriers. A lack of buildable designs and a participative management style for the workforce are the most important barriers to successful waste reduction in terms of strength and ease of overcoming. On the other hand, a lack of an organisational culture that supports teamwork, a lack of prefabrication and a lack of knowledgeable and skilled workers are regarded as low in strength, and at the same time difficult to overcome.

  20. Item Construction and Psychometric Models Appropriate for Constructed Responses

    Science.gov (United States)

    1991-08-01

    which involve only one attribute per item. This is especially true when we are dealing with constructed-response items, we have to measure much more...Service University of Ilinois Educacional Testing Service Rosedal Road Capign. IL 61801 Princeton. K3 08541 Princeton. N3 08541 Dr. Charles LeiS Dr

  1. A Construction Management Framework for Mass Customisation in Traditional Construction

    Directory of Open Access Journals (Sweden)

    María Dolores Andújar-Montoya

    2015-04-01

    Full Text Available A Mass Customisation model is discussed as a competitive positioning strategy in the marketplace adding value to the customer’s end-use. It includes the user as part of the construction process responding to the customer’s demands and wishes. To the present day, almost all proposals for Mass Customisation have been focused on the design phase and single family houses. The reality is that the processes carried out in the work execution are so inefficient that the costs of the Mass Customisation models are assumed by the customer and they do not offer solutions that support the change management. Furthermore, this inefficiency often makes Mass Customisation unfeasible in terms of deadlines and site management. Therefore, the present proposal focuses on achieving the paradigm of Mass Customisation in the traditional residential construction complementary to the existing proposals in the design phase. All this through the proposal of a framework for the integral management in the work execution, which will address change management introduced by the users offering an efficient and productive model that reduces costs in the process. This model will focus on the synergy between different strategies, techniques and technologies currently used in the construction management (such as Lean Construction or Six Sigma, together with, other strategies and technologies that have proven to be valid solutions in other fields (such as Business Process Management, Service Oriented Architecture, etc..

  2. Construction and demolition waste indicators.

    Science.gov (United States)

    Mália, Miguel; de Brito, Jorge; Pinheiro, Manuel Duarte; Bravo, Miguel

    2013-03-01

    The construction industry is one of the biggest and most active sectors of the European Union (EU), consuming more raw materials and energy than any other economic activity. Furthermore, construction waste is the commonest waste produced in the EU. Current EU legislation sets out to implement construction and demolition waste (CDW) prevention and recycling measures. However it lacks tools to accelerate the development of a sector as bound by tradition as the building industry. The main objective of the present study was to determine indicators to estimate the amount of CDW generated on site both globally and by waste stream. CDW generation was estimated for six specific sectors: new residential construction, new non-residential construction, residential demolition, non-residential demolition, residential refurbishment, and non-residential refurbishment. The data needed to develop the indicators was collected through an exhaustive survey of previous international studies. The indicators determined suggest that the average composition of waste generated on site is mostly concrete and ceramic materials. Specifically for new residential and new non-residential construction the production of concrete waste in buildings with a reinforced concrete structure lies between 17.8 and 32.9 kg m(-2) and between 18.3 and 40.1 kg m(-2), respectively. For the residential and non-residential demolition sectors the production of this waste stream in buildings with a reinforced concrete structure varies from 492 to 840 kg m(-2) and from 401 to 768 kg/m(-2), respectively. For the residential and non-residential refurbishment sectors the production of concrete waste in buildings lies between 18.9 and 45.9 kg/m(-2) and between 18.9 and 191.2 kg/m(-2), respectively.

  3. Perl Modules for Constructing Iterators

    Science.gov (United States)

    Tilmes, Curt

    2009-01-01

    The Iterator Perl Module provides a general-purpose framework for constructing iterator objects within Perl, and a standard API for interacting with those objects. Iterators are an object-oriented design pattern where a description of a series of values is used in a constructor. Subsequent queries can request values in that series. These Perl modules build on the standard Iterator framework and provide iterators for some other types of values. Iterator::DateTime constructs iterators from DateTime objects or Date::Parse descriptions and ICal/RFC 2445 style re-currence descriptions. It supports a variety of input parameters, including a start to the sequence, an end to the sequence, an Ical/RFC 2445 recurrence describing the frequency of the values in the series, and a format description that can refine the presentation manner of the DateTime. Iterator::String constructs iterators from string representations. This module is useful in contexts where the API consists of supplying a string and getting back an iterator where the specific iteration desired is opaque to the caller. It is of particular value to the Iterator::Hash module which provides nested iterations. Iterator::Hash constructs iterators from Perl hashes that can include multiple iterators. The constructed iterators will return all the permutations of the iterations of the hash by nested iteration of embedded iterators. A hash simply includes a set of keys mapped to values. It is a very common data structure used throughout Perl programming. The Iterator:: Hash module allows a hash to include strings defining iterators (parsed and dispatched with Iterator::String) that are used to construct an overall series of hash values.

  4. Pipework in power plant construction

    International Nuclear Information System (INIS)

    Schwarzbach, K.

    1984-01-01

    With the development of conventional power plant construction to large unit sizes and because of the stringent safety requirements in nuclear poer stations, pipework installation has developed into a difficult operation closely inter-related with safety engineering. It is an important factor as far as completion dates and costs are concerned during the timely implementation of a subsequent construction phase which is characterized by high capital intensiveness. In order to keep both under control, prior planning and execution supported by electronic data processing are essential. (orig.) [de

  5. Odelouca Dam Construction: Numerical Analysis

    OpenAIRE

    Brito, A.; Maranha, J. R.; Caldeira, L.

    2012-01-01

    Odelouca dam is an embankment dam, with 76 m height, recently constructed in the south of Portugal. It is zoned with a core consisting of colluvial and residual schist soil and with soil-rockfill mixtures making up the shells (weathered schist with a significant fraction of coarse sized particles). This paper presents a numerical analysis of Odelouca Dam`s construction. The material con-stants of the soil model used are determined from a comprehensive testing programme carried out in the C...

  6. Building constructions: architecture and nature

    Directory of Open Access Journals (Sweden)

    Mayatskaya Irina

    2017-01-01

    Full Text Available The problem of optimization of building structures is considered in architectural bionic modeling on the bionic principle basis. It is possible to get a reliable and durable constructions by studying the structure and the laws of organization of natural objects. Modern architects have created unique buildings using the bionic approach. There are such properties as symmetry, asymmetry, self-similarity and fractality used in the modern architecture. Using the methods of fractal geometry in the design of architectural forms allows finding a variety of constructive solutions.

  7. International Construction Disputes in Denmark

    DEFF Research Database (Denmark)

    Cavaleri, Sylvie Cécile

    2016-01-01

    The article discusses whether the very peculiar Danish system of resolution of construction disputes, which is an hybrid between arbitration and State-Court proceedings, is geared for disputes involving non-Danish parties, comes to the conclusion that it is not, and proposes amendments to the sys......The article discusses whether the very peculiar Danish system of resolution of construction disputes, which is an hybrid between arbitration and State-Court proceedings, is geared for disputes involving non-Danish parties, comes to the conclusion that it is not, and proposes amendments...

  8. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  9. Entangled entanglement: A construction procedure

    Energy Technology Data Exchange (ETDEWEB)

    Uchida, Gabriele, E-mail: Gabriele.Uchida@univie.ac.at [University of Vienna, Faculty of Computer Science, Währinger Strasse 29, 1090 Vienna (Austria); Bertlmann, Reinhold A., E-mail: Reinhold.Bertlmann@univie.ac.at [University of Vienna, Faculty of Physics, Boltzmanngasse 5, 1090 Vienna (Austria); Hiesmayr, Beatrix C., E-mail: Beatrix.Hiesmayr@univie.ac.at [University of Vienna, Faculty of Physics, Boltzmanngasse 5, 1090 Vienna (Austria)

    2015-10-30

    The familiar Greenberger–Horne–Zeilinger (GHZ) states can be rewritten by entangling the Bell states for two qubits with a third qubit state, which is dubbed entangled entanglement. We show that in a constructive way we obtain all eight independent GHZ states that form the simplex of entangled entanglement, the magic simplex. The construction procedure allows a generalization to higher dimensions both, in the degrees of freedom (considering qudits) as well as in the number of particles (considering n-partite states). Such bases of GHZ-type states exhibit a cyclic geometry, a Merry Go Round, that is relevant for experimental and quantum information theoretic applications.

  10. Construct ability Improvement for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dae Soo; Lee, Jong Rim; Kim, Jong Ku [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    The purpose of this study was to identify methods for improving the construct ability of nuclear power plants. This study reviewed several references of current construction practices of domestic and overseas nuclear plants in order to identify potential methods for improving construct ability. The identified methods for improving construct ability were then evaluated based on the applicability to domestic nuclear plant construction. The selected methods are expected to reduce the construction period, improve the quality of construction, cost, safety, and productivity. Selection of which methods should be implemented will require further evaluation of construction modifications, design changes, contract revisions. Among construction methods studied, platform construction methods can be applied through construction sequence modification without significant design changes, and Over the Top construction method of the NSSS, automatic welding of RCL pipes, CLP modularization, etc., are considered to be applied after design modification and adjustment of material lead time. (author). 49 refs., figs., tabs.

  11. Dam's design continues throughout construction

    Energy Technology Data Exchange (ETDEWEB)

    Lara E, R; Wulff, J G

    1979-11-01

    In spite of adverse site conditions, Arenal dam in Costa Rica was completed a year ahead of schedule. Historical data on local earthquake activity which was available in unusual detail reduced some uncertainties in design information. Other uncertainties regarding the complex foundation conditions were resolved as excavation and construction progressed.

  12. The cultural construction of emotions

    NARCIS (Netherlands)

    Mesquita, B.; Boiger, M.; De Leersnyder, J.

    A large body of anthropological and psychological research on emotions has yielded significant evidence that emotional experience is culturally constructed: people more commonly experience those emotions that help them to be a good and typical person in their culture. Moreover, experiencing these

  13. ATLAS, Construction of a Giant

    CERN Multimedia

    McCubbin, Norman

    2004-01-01

    One of the most impressive aspects of modern particle physics in the scale of the equipment. The accelerators require the construction of underground tunnels many kilometers long containing evacuated pipes through which beams of particles travel at incredibly high energies. Even more spectacular are the gigantic complex assemblies that make up the experiments themselves

  14. Partnering in the Construction Industry

    DEFF Research Database (Denmark)

    Ditlev Bohnstedt, Kristian; Bejder, Erik; Haugbølle, Kim

    2013-01-01

    Huge efforts have been made in order to stimulate thorough improvements in the construction industry in terms of value for money, feasibility and consistency when facilitating a partnering approach. Despite this attention there is limited documentation on the development of research trends, thus...

  15. Infantilism: Theoretical Construct and Operationalization

    Science.gov (United States)

    Sabelnikova, Y. V.; Khmeleva, N. L.

    2018-01-01

    The aim of this article is to define and operationalize the construct of infantilism. The methods of theoretical research involve analysis and synthesis. Age and content criteria are analyzed for childhood and adulthood. Infantile traits in an adult are described. Results: The characteristics of adult infantilism in the modern world are defined,…

  16. Construction industry accidents in Spain.

    Science.gov (United States)

    Camino López, Miguel A; Ritzel, Dale O; Fontaneda, Ignacio; González Alcantara, Oscar J

    2008-01-01

    This paper analyzed industrial accidents that take place on construction sites and their severity. Eighteen variables were studied. We analyzed the influence of each of these with respect to the severity and fatality of the accident. This descriptive analysis was grounded in 1,630,452 accidents, representing the total number of accidents suffered by workers in the construction sector in Spain over the period 1990-2000. It was shown that age, type of contract, time of accident, length of service in the company, company size, day of the week, and the remainder of the variables under analysis influenced the seriousness of the accident. IMPACT ON INJURY PREVENTION: The results obtained show that different training was needed, depending on the severity of accidents, for different age, length of service in the company, organization of work, and time when workers work. The research provides an insight to the likely causes of construction injuries in Spain. As a result of the analysis, industries and governmental agencies in Spain can start to provide appropriate strategies and training to the construction workers.

  17. Civil works for NPPs construction

    International Nuclear Information System (INIS)

    Portenseigne, Christophe

    2014-01-01

    Christophe Portenseigne, Technical Director of Bouygues Travaux Publics, provided explanations on the main challenges of Civil work for the construction of the 3. generation of NPPs. He then provided an overview of the new Civil Work concepts for the 4. generation of NPPs

  18. Automation in building and construction

    NARCIS (Netherlands)

    Gassel, van F.J.M.

    2010-01-01

    De komende 30 jaar zal naar verwachting de werkkracht in Nederland van 11 miljoen naar 10 miljoen mensen afnemen (van Bronswijk, 2010). Willen we dezelfde hoeveelheid taken blijven uitvoeren dan zuIlen we extra hulpmiddelen moeten inzetten. Automation in Building and Construction is het

  19. Geometric Constructions with the Computer.

    Science.gov (United States)

    Chuan, Jen-chung

    The computer can be used as a tool to represent and communicate geometric knowledge. With the appropriate software, a geometric diagram can be manipulated through a series of animation that offers more than one particular snapshot as shown in a traditional mathematical text. Geometric constructions with the computer enable the learner to see and…

  20. Utilizing platforms in industrialized construction

    DEFF Research Database (Denmark)

    Bonev, Martin; Wörösch, Michael; Hvam, Lars

    2015-01-01

    platform strategies, this researchhighlights key aspects of adapting platform-based developed theory to industrialised construction.Building projects use different layers of product, process and logistics platforms to form the right cost– value ratio for the target market application, while modelling...

  1. Construction waste in Costa Rica

    NARCIS (Netherlands)

    Abarca Guerrero, L.; Maas, G.J.; Lambert, A.J.D.; Troyo, F

    2012-01-01

    In developing countries, construction waste is becoming a serious environmental problem due to the continuing growing population and urbanization, which demand material resources, water and energy. Information and data about the sector in those economies is scarce and some of the information found

  2. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Eymess, K.J.; Haas, R.; Wellnitz, G.

    1980-01-01

    Quality Assurance for Nuclear Power Plants under consideration of pipe assembling. Flow of Quality Requirements during: - Desing - Construction - Procurement - Prefabrication - Site. Organizational Requirements and Measurements during Erection: - Incoming Control - Material Storage - Surveillance of Tools - Weld Surveillance - Nondestructive Testing - Cleaning - Final Documentation. Qualification and Training of QA Personnel. (orig.)

  3. The worlds retail buyers construct

    DEFF Research Database (Denmark)

    Esbjerg, Lars

    Previous research on retailer buying has assumed that the context of decision-making is more or less objectively given, or is at least kept constant for the purpose of study. This paper develops an alternative view in which retail buyers and retailers actively participate in the construction...

  4. Piaget's Egocentrism: A Unitary Construct?

    Science.gov (United States)

    Ruthven, Avis J.; Cunningham, William L.

    In order to determine whether egocentrism can be conceptualized as a unitary construct, 100 children (51 four-year-olds, 37 five-year-olds, and 12 six-year-olds) were administered a visual/spatial perspective task, a cognitive/communicative task, and an affective task. All tasks were designed to measure different facets of egocentrism. The 50…

  5. Discourse Analysis and Social Construction.

    Science.gov (United States)

    Bazerman, Charles

    1990-01-01

    A brief review of social constructivism as a general movement and how it has been applied in particular to scientific knowledge precedes a review of investigations into the role language and linguistic activities have in the social construction of knowledge. A 39-citation unannotated bibliography is included. (CB)

  6. 2. The While-Construct

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 1; Issue 3. Algorithms The While-Construct. R K Shyamasundar. Series Article Volume 1 Issue 3 ... Author Affiliations. R K Shyamasundar1. Computer Science Group, Tata Institute of Fundamental Research, Homi Bhabha Road, Bombay 400 005, India.

  7. Algorithms for Decision Tree Construction

    KAUST Repository

    Chikalov, Igor

    2011-01-01

    The study of algorithms for decision tree construction was initiated in 1960s. The first algorithms are based on the separation heuristic [13, 31] that at each step tries dividing the set of objects as evenly as possible. Later Garey and Graham [28

  8. TRANSITIVITY AND THE BA CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Pei-Jung Kuo

    2010-06-01

    Full Text Available In this paper, I discuss the legitimacy of positing a Transitivity Projection (= TrP cf. Bowers 1993, 1997, 2001 and 2002 in the BA construction in Mandarin Chinese. BA has been proposed to be a semantically-bleached verb, inserted in the v position (Huang 1997 and Lin 2001. Several pieces of evidence such as manner adverbial placement (cf. Huang, Li and Li 2009 and GEI-insertion (cf. Tang 2001 indicate that there must be a functional projection between the vP and VP to host the BA NP. I propose that a TrP is probably the most apt candidate for the XP. I also argue, in contrast to the proposal by Huang, Li and Li (2009, that the present proposal which employs a TrP captures most of the properties of the BA construction. A comparison with the structure of the BEI construction also shows that the TrP proposal fits into the general picture of current linguistic theory on transitive constructions without extra stipulations.

  9. Fire safety of wood construction

    Science.gov (United States)

    Robert H. White; Mark A. Dietenberger

    2010-01-01

    Fire safety is an important concern in all types of construction. The high level of national concern for fire safety is reflected in limitations and design requirements in building codes. These code requirements and related fire performance data are discussed in the context of fire safety design and evaluation in the initial section of this chapter. Because basic data...

  10. Constructions of aluminium electrolytic cells

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to constructions of aluminium electrolytic cells. Therefore, the general characteristic and classification of aluminium electrolytic cells was considered. The anode and cathode structure was studied. The lining of cathode casing, the process of collection of anode gases, electrolytic cell cover, and electrical insulation was studied as well. The installation and dismantling of aluminium electrolytic cells was described.

  11. Enhancing Teaching through Constructive Alignment.

    Science.gov (United States)

    Biggs, John

    1996-01-01

    An approach to college-level instructional design that incorporates the principles of constructivism, termed "constructive alignment," is described. The process is then illustrated with reference to a professional development unit in educational psychology for teachers, but the model is viewed as generalizable to most units or programs in higher…

  12. Construction research needs in Europe

    DEFF Research Database (Denmark)

    1991-01-01

    fælles europæisk forsknings- og udviklingsstrategi for byggesektoren har det europæiske netværk af byggeforskningsinstitutter, ENBRI, sammenfattet de nationale forskningstemaer samt analyseret perspektiver og behov. Dette materiale er anvendt som diskussionsoplæg ved symposiet Construction research needs...

  13. UK manufacturers construction joint venture

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This report examines the legal and commercial framework for UK manufacturers to collaborate in a construction venture for a small combustion/steam cycle power plant fueled with biomass. The integration of technology and project plan, the working capital and capitalisation, financial aspects, the market plan, turnkey packages, joint venture entities, and collaboration are discussed. (UK)

  14. Higher holonomies: comparing two constructions

    DEFF Research Database (Denmark)

    Schaetz, Florian; Arias Abad, Camilo

    2015-01-01

    , there are the higher holonomies associated with flat superconnections as studied by Igusa [7], Block–Smith [3] and Arias Abad–Schätz [1]. We first explain how by truncating the latter construction one obtains examples of the former. Then we prove that the two-dimensional holonomies provided by the two approaches...

  15. Rate meter design and construction

    International Nuclear Information System (INIS)

    Peon Aguirre, R.; Fonseca Araujo, W.H.

    1989-01-01

    An electric diagram is proposed to build a geiger detector Rate Meter, to count gamma radiation and X ray. This idea was made up with the prototype construction which has a five scales analogue display (100, 300, 1000, 3000 and 10000 c/s). (Author)

  16. Ice as a Construction Material

    Science.gov (United States)

    Zuppero, Anthony; Lewis, Joseph

    1998-01-01

    The use of ice as a construction material is discussed. A model of an ice tire torus space ship, which slowly spins to produce artificial gravity is proposed. The size of the ship, needed to support a given number of people and the required envelope mass is presented.

  17. Construction Management--Exploding Some Myths.

    Science.gov (United States)

    Kluenker, Charles

    1986-01-01

    Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)

  18. Construction technique for a chemical plant (II)

    International Nuclear Information System (INIS)

    1978-08-01

    This book deals with design and construction for a chemical plant which includes design and building of steel structure for a chemical plant with types, basic regulation, plan, shop fabrication for steel structure and field construction. It explains design and construction of making building for a chemical construction with measurement, types of building and basic rule of the building, design of the building, constructing plumbing for a chemical plant with plan, management of material, checking for construction, construction of electrical installation on plan, know-how to construction and maintenance.

  19. Tom Ford Construction, LLC Information Sheet

    Science.gov (United States)

    Tom Ford Construction, LLC (the Company) is located in Brentwood, Tennessee. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Nashville, Tennessee.

  20. Spatio-Temporal Data Construction

    Directory of Open Access Journals (Sweden)

    Hai Ha Le

    2013-08-01

    Full Text Available On the route to a spatio-temporal geoscience information system, an appropriate data model for geo-objects in space and time has been developed. In this model, geo-objects are represented as sequences of geometries and properties with continuous evolution in each time interval. Because geomodeling software systems usually model objects at specific time instances, we want to interpolate the geometry and properties from two models of an object with only geometrical constraints (no physical or mechanical constraints. This process is called spatio-temporal data construction or morphological interpolation of intermediate geometries. This paper is strictly related to shape morphing, shape deformation, cross-parameterization and compatible remeshing and is only concerned with geological surfaces. In this study, two main sub-solutions construct compatible meshes and find trajectories in which vertices of the mesh evolve. This research aims to find an algorithm to construct spatio-temporal data with some constraints from the geosciences, such as cutting surfaces by faulting or fracturing phenomena and evolving boundaries attached to other surfaces. Another goal of this research is the implementation of the algorithm in a software product, namely a gOcad plug-in. The four main procedures of the algorithm are cutting the surfaces, setting up constraints, partitioning and calculating the parameterizations and trajectories. The software has been tested to construct data for a salt dome and other surfaces in regard to the geological processes of faulting, deposition and erosion. The result of this research is an algorithm and software for the construction of spatio-temporal data.

  1. Advanced design and construction technology for ABWR

    International Nuclear Information System (INIS)

    Kawahara, Akira

    2003-01-01

    Recently, many countries start planning to construct nuclear plants, and the electric power companies and the plant suppliers are acutely aware of the importance of the technical infrastructure required for construction planning and execution as this has a significant influence on construction costs. Plant suppliers in Japan have been focusing its attention on the efficiency of construction from earlier, because of its significant role in determining overall construction costs. Through continuous efforts to reduce fieldwork costs, we have developed unique technologies, especially the 3D-CAD system and other advanced construction technologies including modularization. We, plant suppliers are now turning its attention to overseas nuclear plants construction also, and are developing more rational, economical, and global construction based on its vast experience in construction techniques. In this report, the evolution of plant engineering methods and construction technologies, the present level of progress in construction, and technical developments for the future, are described. (author)

  2. Potential of Progressive Construction Systems in Slovakia

    Science.gov (United States)

    Kozlovska, Maria; Spisakova, Marcela; Mackova, Daniela

    2017-10-01

    Construction industry is a sector with rapid development. Progressive technologies of construction and new construction materials also called modern methods of construction (MMC) are developed constantly. MMC represent the adoption of construction industrialisation and the use of prefabrication of components in building construction. One of these modern methods is also system Varianthaus, which is based on, insulated concrete forms principle and provides complete production plant for wall, ceiling and roof elements for a high thermal insulation house construction. Another progressive construction system is EcoB, which represents an insulated precast concrete panel based on combination of two layers, insulation and concrete, produced in a factory as a whole. Both modern methods of construction are not yet known and wide-spread in the Slovak construction market. The aim of this paper is focused on demonstration of MMC using potential in Slovakia. MMC potential is proved based on comparison of the selected parameters of construction process - construction costs and construction time. The subject of this study is family house modelled in three material variants - masonry construction (as a representative of traditional methods of construction), Varianthaus and EcoB (as the representatives of modern methods of construction). The results of this study provide the useful information in decision-making process for potential investors of construction.

  3. Constructal theory of social dynamics

    CERN Document Server

    Bejan, Adrian

    2007-01-01

    Combines for the first time theories of general physics and applies them to social sciencesOffers a new way to look at social phenomena as part of natural phenomenaA new domain of application of engineering such as thermodynamic optimization, thermoeconomics and "design as science"Discusses how the "flow architectures" of natural sciences are also found in social situationsBoth classes are covered by the same principle (the constructal law)First work to show that the concept of "efficiency" of engineering has a home in physics and social sciencesThe constructal law theory puts a scientific principle behind the major challenges of today and the future: sustainable development, energy sufficiency, equilibria between human settlements and environmental ecosystems, optimal allocation, optimal distribution of finite resources, etc.

  4. Multiword Constructions in the Grammar.

    Science.gov (United States)

    Culicover, Peter W; Jackendoff, Ray; Audring, Jenny

    2017-07-01

    There is ample evidence that speakers' linguistic knowledge extends well beyond what can be described in terms of rules of compositional interpretation stated over combinations of single words. We explore a range of multiword constructions (MWCs) to get a handle both on the extent of the phenomenon and on the grammatical constraints that may govern it. We consider idioms of various sorts, collocations, compounds, light verbs, syntactic nuts, and assorted other constructions, as well as morphology. Our conclusion is that MWCs highlight the central role that grammar plays in licensing MWCs in the lexicon and the creation of novel MWCs, and they help to clarify how the lexicon articulates with the rest of the grammar. Copyright © 2017 Cognitive Science Society, Inc.

  5. Strategic Scenario Construction Made Easy

    DEFF Research Database (Denmark)

    Duus, Henrik Johannsen

    2016-01-01

    insights from the area of strategic forecasting (of which scenario planning is a proper subset) and experiences gained from a recent course in that area to develop a simpler, more direct, hands-on method for scenario construction and to provide several ideas for scenario construction that can be used......Scenario planning is a well-known way to develop corporate strategy by creating multiple images of alternative futures. Yet although scenario planning grew from very hands-on strategy development efforts in the military and from operations research dedicated to solving practical problems, the use...... of scenarios in business has, in many cases, remained a cumbersome affair. Very often a large group of consultants, employees and staff is involved in the development of scenarios and strategies, thus making the whole process expensive in terms of time, money and human resources. In response, this article uses...

  6. Construction, emplacement, and retrievability (preclosure)

    International Nuclear Information System (INIS)

    McClain, W.

    1985-01-01

    Each of the three preclosure subgroups of the Construction, Emplacement, and Retrievability Working Group adopted a six-step approach to identify and assess current needs in geotechnical modeling and characterization. This approach may be summarized as follows: identify phenomena related to emplacement of high-level nuclear wastes, identify types of models which are required to calculate the phenomena, establish the input data needs for the models, assess the current availability of the models, assess the current status of documentation, verification, and validation of the models, and determine the adequacy of instrumentation and measurement techniques to (a) validate the models, where necessary, and (b) obtain input data for design. Systematic application of these six steps leads to the establishment of the research requirements for geotechnical modeling and characterization. A summary of modeling techniques which apply to the three subsequent sections on construction, emplacement, and retrievability is presented. Research needs, which apply to all preclosure activities, are summarized

  7. Green Construction in Building Renovation

    Science.gov (United States)

    Ksit, Barbara; Majcherek, Michał

    2016-06-01

    Modern materials and construction solutions draw more and more attention to ecology and building certification. Among the criteria appearing in revitalization, an important element is bringing plants back into heavily urbanized areas. In its natural form, this is not possible to carry out everywhere, often requiring large amounts of space. Nowadays, however, there are a number of green roofs and green wall systems, allowing "greener" construction without making significant changes in the urban environment. The article includes a presentation and analysis of selected solutions of biological surfaces known as green roofs and green walls, specifying various solutions and their most important features. The case study focuses primarily on material and design solutions, as well as the potential benefits, risks and limitations in their use. Plants structures on the surfaces of vertical and horizontal partitions continue to be a very interesting alternative to take into account when applying for grants, such as LEED or BREEAM certificates.

  8. Biomass furnace: projection and construction

    Energy Technology Data Exchange (ETDEWEB)

    Melo, Fernanda Augusta de Oliveira; Silva, Juarez Sousa e; Silva, Denise de Freitas; Sampaio, Cristiane Pires; Nascimento Junior, Jose Henrique do [Universidade Federal de Vicosa (DEA/UFV), MG (Brazil). Dept. de Engenharia Agricola

    2008-07-01

    Of all the ways to convert biomass into thermal energy, direct combustion is the oldest. The thermal-chemical technologies of biomass conversion such as pyrolysis and gasification, are currently not the most important alternatives; combustion is responsible for 97% of the bio-energy produced in the world (Demirbas, 2003). For this work, a small furnace was designed and constructed to use biomass as its main source of fuel, and the combustion chamber was coupled with a helical transporter which linked to the secondary fuel reservoir to continually feed the combustion chamber with fine particles of agro-industrial residues. The design of the stove proved to be technically viable beginning with the balance of mass and energy for the air heating system. The proposed heat generator was easily constructed as it made use of simple and easily acquired materials, demanding no specialized labor. (author)

  9. Partnering models in Nordic construction

    DEFF Research Database (Denmark)

    Larsen, Jacob Norvig

    of local research and industry partners including major building clients. Data were collected by means of national reviews of partnering policies and practices, thematic analyses, and case studies. The concept partnering was introduced in a Nordic context in the 1990s and has since then been implemented...... in a large number of projects. Clients sought to establish a culture of openness and trust within the project and tried promoting this with various kinds of incentives. In some countries the move towards voluntary collaboration was, paradoxically, strongly advocated by public authorities. Generally, however......Traditionally, procurement and contractual policies adopted by building and construction clients produce a system in which clients procure design services separately from construction services, while operation and maintenance have been subject to further, separate procurement actions...

  10. Method of constructing reactor buildings

    International Nuclear Information System (INIS)

    Hyuga, Takenori; Nagai, Fumio; Akutsu, Masayoshi.

    1985-01-01

    Purpose: To shorten the construction period for LMFBR type reactors, as well as smoothly introduce high pressure steams generated in concretes upon loss of coolant accidents to the outside of the system. Method: After disposing a liner plate as a chamber lining of reactor buildings, heat insulation materials having steam discharge channels at the outer surface are attached to the outside of the liner plate and, further, an organic films are disposed to the outside of the heat insulation materials. Then, concretes are spiked to the outside of the organic films using the liner plate and the heat insulation material as the mold for concretes. In this way, the construction period can be shortened by utilizing the liner plate and the heat insulation materials as the mold for concretes, as well as steams at high temperature resulted in the concretes upon loss of coolant accidents can smoothly be discharged to the outside of the system. (Moriyama, K.)

  11. The construction of teaching professionality

    Directory of Open Access Journals (Sweden)

    Heloisa Helena Oliveira de Azevedo

    2013-04-01

    Full Text Available This article was prepared by the results of a research of a investigation about the formative strategies developed by educators related to the construction of the professionality of future childhood and elementary school teachers.From the analysis of the content of the interviews, we want to know what the educators think about the teaching profession and conducting training activities aimed at building the professionalism of future teachers.With theoretical bases for analyses related to the historical-critical conception of education, we inferred that educators have tried to break with the traditional paradigm of teacher’s education, creating new learning alternatives and stimulating the construction of a new professionality that overcomes the culture of isolated an individual thinking

  12. 23 CFR 772.19 - Construction noise.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Construction noise. 772.19 Section 772.19 Highways... ABATEMENT OF HIGHWAY TRAFFIC NOISE AND CONSTRUCTION NOISE § 772.19 Construction noise. The following general... may be affected by noise from construction of the project. The identification is to be performed...

  13. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  14. 7 CFR 3560.71 - Construction financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...

  15. 48 CFR 522.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction. 522.804-2... Construction. Goals for the employment of minorities and women in the construction industry are established by... Construction Contractors.” This guide can be accessed at http://www.dol.gov/esa/ofccp/TAguides/ctaguide.htm...

  16. 45 CFR 605.23 - New construction.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false New construction. 605.23 Section 605.23 Public... Accessibility § 605.23 New construction. (a) Design and construction. Each facility or part of a facility... persons, if the construction was commenced after the effective date of this part. (b) Alteration. Each...

  17. 40 CFR 7.70 - New construction.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false New construction. 7.70 Section 7.70... of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to... 18, 1991, design, construction, or alteration of buildings in conformance with sections 3-8 of the...

  18. 25 CFR 700.467 - Construction costs.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  19. 49 CFR 1101.3 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Construction. 1101.3 Section 1101.3 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE DEFINITIONS AND CONSTRUCTION § 1101.3 Construction. The rules of construction...

  20. 7 CFR 15b.19 - New construction.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false New construction. 15b.19 Section 15b.19 Agriculture... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 15b.19 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...

  1. 23 CFR 140.607 - Construction.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...

  2. 10 CFR 4.128 - New construction.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false New construction. 4.128 Section 4.128 Energy NUCLEAR... 1973, as Amended Discriminatory Practices § 4.128 New construction. (a) Design, construction, and... Federal Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration...

  3. 22 CFR 142.17 - New construction.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false New construction. 142.17 Section 142.17 Foreign... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 142.17 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...

  4. 14 CFR 1251.302 - New construction.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false New construction. 1251.302 Section 1251.302... Accessibility § 1251.302 New construction. (a) Design and construction. Each facility or part of a facility..., if the construction (ground breaking) was commenced after the effective date of this part. (b...

  5. 34 CFR 104.23 - New construction.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false New construction. 104.23 Section 104.23 Education... Accessibility § 104.23 New construction. (a) Design and construction. Each facility or part of a facility..., if the construction was commenced after the effective date of this part. (b) Alteration. Each...

  6. 46 CFR 167.20-1 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Construction. 167.20-1 Section 167.20-1 Shipping COAST... Requirements, Construction and Arrangement of Nautical School Ships § 167.20-1 Construction. Except as otherwise provided by law or regulations in this subpart, the following standards for construction are...

  7. 22 CFR 217.23 - New construction.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false New construction. 217.23 Section 217.23 Foreign... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.23 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...

  8. 45 CFR 1170.33 - New construction.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false New construction. 1170.33 Section 1170.33 Public... ASSISTED PROGRAMS OR ACTIVITIES Accessibility § 1170.33 New construction. (a) Design, construction, and... Federal Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration...

  9. 46 CFR 72.20-15 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Construction. 72.20-15 Section 72.20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS CONSTRUCTION AND ARRANGEMENT Accommodations for Officers and Crew § 72.20-15 Construction. All crew spaces are to be constructed and arranged...

  10. 45 CFR 1151.23 - New construction.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false New construction. 1151.23 Section 1151.23 Public... Prohibited Accessibility § 1151.23 New construction. (a) Design, construction, and alteration. New facilities... Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration of buildings...

  11. Construction Technology of Long Span Bridges

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    2000-01-01

    A large variety of construction methods are used during construction of major bridges, and in many cases the final structural system must be chosen with due respect to the construction process. Today the preferred construction methods are: the free-cantilever method, the launching method...

  12. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  13. Fluid management in space construction

    Science.gov (United States)

    Snyder, Howard

    1989-01-01

    The low-g fluids management group with the Center for Space Construction is engaged in active research on the following topics: gauging; venting; controlling contamination; sloshing; transfer; acquisition; and two-phase flow. Our basic understanding of each of these topics at present is inadequate to design space structures optimally. A brief report is presented on each topic showing the present status, recent accomplishings by our group and our plans for future research. Reports are presented in graphic and outline form.

  14. Constructive use of holographic projections

    International Nuclear Information System (INIS)

    Schroer, Bert

    2008-01-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  15. Electrical measurements during magnet construction

    International Nuclear Information System (INIS)

    Sintchak, G.; Ganetis, G.; Cottingham, G.

    1989-01-01

    Throughout the construction phase of the cold mass for SSC magnets, electrical tests are made to determine that no faults in the coil structure have developed. These tests include ones designed to measure turn-to-turn voltage hold-off, hypot tests to ground, coil resistance, and instrumentation checks. These various tests will be described and the test parameters that are used will be covered. 4 figs

  16. Hydrocarbon removal with constructed wetlands

    OpenAIRE

    Eke, Paul Emeka

    2008-01-01

    Wetlands have long played a significant role as natural purification systems, and have been effectively used to treat domestic, agricultural and industrial wastewater. However, very little is known about the biochemical processes involved, and the use of constructed treatment wetlands in the removal of petroleum aromatic hydrocarbons from produced and/or processed water. Wastewaters from the oil industry contain aromatic hydrocarbons such as benzene, toluene, ethylbenzene and x...

  17. Construction-Paper Puzzle Masterpieces

    Science.gov (United States)

    Vance, Shelly

    2010-01-01

    Creating an appreciation of art history in her junior-high students has always been one of the author's greatest challenges as an art teacher. In this article, the author describes how her eighth-grade students re-created a famous work of art--piece by piece, like a puzzle or a stained-glass window--out of construction paper. (Contains 1 resource.)

  18. Constructive use of holographic projections

    Energy Technology Data Exchange (ETDEWEB)

    Schroer, Bert [Centro Brasileiro de Pesquisas Fisicas (CBPF), Rio de Janeiro, RJ (Brazil); Institut fuer Theoretische Physik der FU, Berlin (Germany)

    2008-07-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  19. Distributed construction of quantum fingerprints

    OpenAIRE

    Ambainis, Andris; Shi, Yaoyun

    2003-01-01

    Quantum fingerprints are useful quantum encodings introduced by Buhrman, Cleve, Watrous, and de Wolf (Physical Review Letters, Volume 87, Number 16, Article 167902, 2001; quant-ph/0102001) in obtaining an efficient quantum communication protocol. We design a protocol for constructing the fingerprint in a distributed scenario. As an application, this protocol gives rise to a communication protocol more efficient than the best known classical protocol for a communication problem.

  20. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  1. Military Construction: Process and Outcomes

    Science.gov (United States)

    2016-12-14

    barracks, schools, hospitals, child development centers, and other facilities needed to support U.S. military forces at home and overseas. This military...and programming into the President’s budget could take three or more years. Furthermore, it is important to note that only those projects that have...travel, fuel, minor construction projects of $1M or less, training and education , and depot maintenance, and base operations support. O&M

  2. Constructive processes in person cognition.

    Science.gov (United States)

    Fiedler, K

    1993-12-01

    The notion of constructive memory processes is imported from research on eyewitness memory to the area of social cognition. Mere questioning about the applicability of personality attributes to a target person is shown to affect subsequent memory-based judgements of that person. These constructive influences are to be distinguished, conceptually, from the global notion of priming effects. In Expt 1, the target person was first described as an extravert; afterwards, subjects had to indicate whether either desirable aspects of extraversion (self-confidence) or undesirable aspects (exhibitionism) apply to the target or not. Mere questioning resulted in a congruent judgment bias towards the questioned attributes that did not generalize to a global halo effect. Experiment 2 replicated the basic finding and demonstrated that this phenomenon is independent of a generation effect (i.e. the memory advantage of self-generated inferences). These results are interpreted in terms of (a) a reframing of the categorical distribution representing the information about the target person in memory and (b) a regressive tendency to assume intermediate default values rather than extreme values for questioned attributes under uncertainty. Alternative explanations in terms of demand effects or a conformation bias cannot provide sufficient accounts. The relevance of constructive processes to understanding self-fulfilling prophecies and other phenomena in social interaction is discussed.

  3. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  4. Degree-based graph construction

    International Nuclear Information System (INIS)

    Kim, Hyunju; Toroczkai, Zoltan; Erdos, Peter L; Miklos, Istvan; Szekely, Laszlo A

    2009-01-01

    Degree-based graph construction is a ubiquitous problem in network modelling (Newman et al 2006 The Structure and Dynamics of Networks (Princeton Studies in Complexity) (Princeton, NJ: Princeton University Press), Boccaletti et al 2006 Phys. Rep. 424 175), ranging from social sciences to chemical compounds and biochemical reaction networks in the cell. This problem includes existence, enumeration, exhaustive construction and sampling questions with aspects that are still open today. Here we give necessary and sufficient conditions for a sequence of nonnegative integers to be realized as a simple graph's degree sequence, such that a given (but otherwise arbitrary) set of connections from an arbitrarily given node is avoided. We then use this result to present a swap-free algorithm that builds all simple graphs realizing a given degree sequence. In a wider context, we show that our result provides a greedy construction method to build all the f-factor subgraphs (Tutte 1952 Can. J. Math. 4 314) embedded within K n setmn S k , where K n is the complete graph and S k is a star graph centred on one of the nodes. (fast track communication)

  5. Air barrier systems: Construction applications

    Energy Technology Data Exchange (ETDEWEB)

    Perrault, J.C

    1989-01-01

    An examination is presented of how ordinary building materials can be used in an innovative manner to design, detail, and construct effective air barrier systems for common types of walls. For residential construction, the air drywall approach uses the interior gypsum board as the main component of the wall air barrier system. Joints between the gypsum board and adjacent materials or assemblies are sealed by gaskets. In commercial construction, two different techniques are employed for using gypsum board as air barrier material: the accessible drywall and non-accessible drywall approaches. The former is similar to the air drywall approach except that high performance sealants are used instead of gaskets. In the latter approach, exterior drywall sheathing is the main component of the air barrier system; joints between boards are taped and joints between boards and other components are sealed using elastomeric membrane strips. For various types of commercial and institutional buildings, metal air barrier systems are widely used and include pre-engineered curtain walls or sheet metal walls. Masonry wall systems are regarded as still the most durable, fireproof, and soundproof wall type available but an effective air barrier system has typically been difficult to implement. Factory-made elastomeric membranes offer the potential to provide airtightness to masonry walls. These membranes are applied on the entire masonry wall surface and are used to make airtight connections with other building components. Two types of product are available: thermofusible and peel-and-stick membranes. 5 figs.

  6. Geometric construction of extended supergravity

    International Nuclear Information System (INIS)

    Kostelecky, V.A.

    1982-01-01

    This work describes the explict construction of the locally SO(4)-invariant, on-shell de Sitter supergravity. First, aspects of classical differential geometry used in the construction of local gauge theories are reviewed. Emphasis is placed on fiber bundles and their uses in Yang-Mills and Einstein theories. Next, the extension of the formalism to differential supergeometry is outlined. Applications to extended supergravities are discussed. Finally, the O(4) deSitter supergravity is obtained by considering a bundle of frames constructed using the orthosymplectic superalgebra osp(4/4). The structure group of this bundle is Sl(2C) x SO(4) and the tangent space to the base supermanifold is homeomorphic to the coset osp(4/4)/sl(2C) x so(4). Constraints taken into the Bianchi identifies yield a realization of the superalgebra in the function space of connections, vielbeins, curvatures and torsions of the bundle. Auxiliary fields, transformation laws and equations of motion are determined. Consistency of the realization is verified, proving closure of the algebra. The associated Poincare supergravity is obtained by a contraction

  7. BUDGET NORMALIZATION AND PRICING FEATURES IN CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    M. I. Gadzhieva

    2016-01-01

    Full Text Available It is proved that the pricing of the construction is different from the pricing system in the industry and other branches of economy, because it has different methodological and organizational approaches. It has been determined that the cost of construction is set on the stage of its design, in the process of concluding investment contracts (construction contracts, as well as directly during construction, major repairs of objects of capital construction, reconstruction and the implementation of certain types of construction and installation works. It has been found that the pricing mechanism in construction is based on the detailed legal and reference documents regulating material consumption rates and prices, taking into account sectoral, territorial and seasonal features of building production. It has been found that under inflation conditions the price index calculation of construction products for investment purposes is of great importance. Mandatory approval of all stakeholders of the construction production method for determining the price of the construction site is proposed.

  8. Budget performance reporting and construction work packaging

    International Nuclear Information System (INIS)

    Strong, M.G.; Weyers, L.L.

    1976-01-01

    A changing financial, technological, and regulatory environment has increased the complexity, costliness, and risk involved in constructing new generating facilities. A primary challenge facing utility executives is to hold down costs on these construction projects. New construction management techniques are required to accomplish this. Commonwealth Edison has responded by implementing a new Budget Performance Reporting System and a Construction Work Packaging System. The new systems are being used successfully on four major construction projects with budgets totaling over $4 billion

  9. Financial management of the construction company

    Directory of Open Access Journals (Sweden)

    Antosova, Karolina

    2016-12-01

    Full Text Available This paper informs about the financial management in the construction company. The work describes problems of the management, its tasks, goals, dependencies on the size of the construction company and progress in the construction production and also introduce topic of the risks in the construction business. Also controlling and reporting in the construction company together with basic tools are described in example of Metrostav a.s. in this work.

  10. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  11. Experimental studies of Steel Corrugated Constructions

    Directory of Open Access Journals (Sweden)

    Lazarev Yuriy

    2016-01-01

    Full Text Available The purpose of this particular article is to assess existing calculations of steel corrugated constructions. Steel Corrugated Construction is a perspective type of constructions, which is exhibiting numerous advantages in comparison with one that currently applied in automobile and railroad networks (reinforced concrete water-throughput pipes, reinforced concrete frame bridges. The evaluation of experimental data on models of constructions of this particular type has been carried out in order to improve calculations of Steel Corrugated Constructions.

  12. Supply Chain Management In Construction Revealed

    Directory of Open Access Journals (Sweden)

    Dr. Ghaith Al-Werikat

    2017-03-01

    Full Text Available The construction supply chain plays a major role in the construction market competition. Construction supply chain management assists enterprises by helping to improve competitiveness increase profits and have more control over the different factors and variables within the project. This paper discusses the construction supply chain characteristics challenges and problems supply chains encounter and the benefits of an integrated supply chain in the construction sector.

  13. Supply Chain Management In Construction Revealed

    OpenAIRE

    Dr. Ghaith Al-Werikat

    2017-01-01

    The construction supply chain plays a major role in the construction market competition. Construction supply chain management assists enterprises by helping to improve competitiveness increase profits and have more control over the different factors and variables within the project. This paper discusses the construction supply chain characteristics challenges and problems supply chains encounter and the benefits of an integrated supply chain in the construction sector.

  14. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  15. Advanced construction management for lunar base construction - Surface operations planner

    Science.gov (United States)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  16. SYSTEM OF STANDARTIZATION OF CONSTRUCTION OPERATIONS ARRANGEMENT

    Directory of Open Access Journals (Sweden)

    Oleynik Pavel Pavlovich

    2012-10-01

    Full Text Available In the proposed article, management of construction operations is represented as a multi-level system; it is considered with the framework of projects including new construction, restructuring and overhaul of buildings and structures. The system of management of construction operations is to be composed of the following three constituent parts. They include a construction and assembling entity, project and operations, and a procurement base. Such matters as the quality of construction products, purchase (lease of building machinery and vehicles are incorporated into the level of the construction and assembling entity. The project level comprises such components of construction operations management as pre-construction preparation of a project, methods and forms of construction management, preparatory works, management of construction activities, real-time operations control, construction quality control, etc. The level of operations and the procurement base covers the needs for materials and equipment, their purchase and procurement, as well as the warehouse management. The main elements of the standardization system are identified. Standards of construction operations management are explained, including 1. General Provisions; 2. Preparation and performance of construction and assembling works; 3. New construction. Building site organization; 4. Demolition (dismantling of buildings and structures; 5. Rules of preparation for acceptance and commissioning of completed residential buildings. The prospects for the further development of the system of standardization of construction operations management are outlined

  17. Construction Managers’ Perception of the Factors Affecting Sustainability in Construction Projects

    OpenAIRE

    Reza Taheriattar; Morvarid Farzanehrafat

    2014-01-01

    Sustainable construction is a comprehensive concept which requires long-term planning. Moreover, construction managers play a key role in leading, planning and scheduling of a construction project. As a result, sustainability of construction projects can be affected by construction managers’ decisions. In addition, for greater development of sustainable construction, affecting factors should firstly be notified. Therefore, it seems necessary to investigate construction managers’ perception of...

  18. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  19. INFANTILISM: THEORETICAL CONSTRUCT AND OPERATIONALIZATION

    Directory of Open Access Journals (Sweden)

    Yelena V. Sabelnikova

    2016-01-01

    Full Text Available The aim of the presented research is to define and operationalize theoretically the concept of infantilism and its construct. The content of theoretical construct «infantilism» is analyzed. Methods. The methods of theoretical research involve analysis and synthesis. The age and content criteria are analysed in the context of childhood and adulthood. The traits which can be interpreted as adult infantile traits are described. Results. The characteristics of adult infantilism in modern world taking into account the increasing of information flows and socio-economic changes are defined. The definition of the concept «infantilism» including its main features is given. Infantilism is defined as the personal organization including features and models of the previous age period not adequate for the real age stage with emphasis on immaturity of the emotional and volitional sphere. Scientific novelty. The main psychological characteristics of adulthood are described as the reflection, requirement to work and professional activity, existence of professional self-determination, possession of labor skills, need for selfrealization, maturity of the emotional and volitional sphere. As objective adulthood characteristics are considered the following: transition to economic and territorial independence of a parental family, and also development of new social roles, such as a worker, spouse, and parent. Two options of a possible operationalization of concept are allocated: objective (existence / absence in real human life of objective criteria of adulthood and subjective (the self-report on subjective feeling of existence / lack of psychological characteristics of adulthood. Practical significance consists in a construct operationalization of «infantilism» which at the moment has so many interpretations. That operationalization is necessary for the further analysis and carrying out various researches. 

  20. Facility design, construction, and operation

    International Nuclear Information System (INIS)

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l'Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l'Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec's contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides' all of the basic information in these areas and reflects actual experience to date

  1. Handbook of energy use for building construction

    Energy Technology Data Exchange (ETDEWEB)

    Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  2. Sustainable development and construction industry in Malaysia

    Directory of Open Access Journals (Sweden)

    Suliman L. Kh. M.

    2009-12-01

    Full Text Available Sustainable construction is a way for the building and infrastructure industry to move towards achieving sustainable development, taking into account environmental, socioeconomic and cultural issues. Differing approaches and differing economic markets lead to different priorities. This paper presents the construction scenario of Malaysia and the developments in sustainable construction taking place in this country. Barriers to the implementation of sustainable construction are discussed. A list of recommendation was proposed to drive sustainable construction in this country. In conclusion, the status of sustainable construction in Malaysia is still in its infancy. The lack of awareness, training and education, ineffective procurement systems, existing public policies and regulatory frameworks are among the major barriers for sustainable construction in Malaysia. Besides the needs for capacities, technologies and tools, total and ardent commitment by all players in the construction sectors including the governments and the public atlarge are required in order to achieve sustainable construction in Malaysia.

  3. Handbook of energy use for building construction

    Science.gov (United States)

    Stein, R. G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, railroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. Emphasis is given to new building construction; however, some information for the other parts of the construction industry is also included. Building designers are provided with information to determine the energy required for buildings construction and to evaluate the energy required for alternative materials, assemblies, and methods. It is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  4. Real analysis a constructive approach

    CERN Document Server

    Bridger, Mark

    2012-01-01

    A unique approach to analysis that lets you apply mathematics across a range of subjects This innovative text sets forth a thoroughly rigorous modern account of the theoretical underpinnings of calculus: continuity, differentiability, and convergence. Using a constructive approach, every proof of every result is direct and ultimately computationally verifiable. In particular, existence is never established by showing that the assumption of non-existence leads to a contradiction. The ultimate consequence of this method is that it makes sense-not just to math majors but also to students from a

  5. Development of Building Envelope Constructions

    DEFF Research Database (Denmark)

    Tommerup, Henrik Monefeldt; Munch-Andersen, Jørgen; Esbensen, Peter Kjær

    2000-01-01

    It is expected that the heat insulation demands in the Danish Building Regulations will be further increased around 2005, in order to reduce the heating demand and the CO2-emission. A simple increase of the insulation thickness of common wall types seems not to be attractive due to the increased...... effect of the 2-dimensional heat loss, the large wall thickness, and the costs of the wide foundation. Therefore, new types of walls have been developed. It is sought to minimise the total heat loss as well as the material consumption. The target was to come up with new walls for which the construction...

  6. NPP Prevlaka - Preparation of construction

    International Nuclear Information System (INIS)

    Bojic, K.

    1984-01-01

    On the basis of study 'Optimal electricity generation structure till the year 2000' production of 3 x 500 MWe in nuclear power plants has been anticipated. Second Croatian-Slovenian NPP project will be based on the same principles the first one (NPP Krsko) was based on. Preconstruction investigation studies are performed at site Prevlaka on river Sava downstream of Zagreb. Licensing procedure has started with republic Urban countryside planning activities. Preconstruction activities are planned to be finished by the end of 1986. while the construction is expected to start during 1987. Parallel to investigation studies for NPP Prevlaka, evaluation of nuclear technology and reactor type is planned to be made. (author)

  7. Baby MIND Experiment Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Antonova, M.; et al.

    2017-04-28

    Baby MIND is a magnetized iron neutrino detector, with novel design features, and is planned to serve as a downstream magnetized muon spectrometer for the WAGASCI experiment on the T2K neutrino beam line in Japan. One of the main goals of this experiment is to reduce systematic uncertainties relevant to CP-violation searches, by measuring the neutrino contamination in the anti-neutrino beam mode of T2K. Baby MIND is currently being constructed at CERN, and is planned to be operational in Japan in October 2017.

  8. Automatic Construction of Finite Algebras

    Institute of Scientific and Technical Information of China (English)

    张健

    1995-01-01

    This paper deals with model generation for equational theories,i.e.,automatically generating (finite)models of a given set of (logical) equations.Our method of finite model generation and a tool for automatic construction of finite algebras is described.Some examples are given to show the applications of our program.We argue that,the combination of model generators and theorem provers enables us to get a better understanding of logical theories.A brief comparison betwween our tool and other similar tools is also presented.

  9. Weldability charts for constructional steels

    International Nuclear Information System (INIS)

    Ion, J C; Ashby, M F

    2012-01-01

    The weldability of materials is still a poorly understood concept; a quantitative assessment remains elusive. The variables associated with welding are reduced here into two groups - processing parameters and material properties - from which two characteristic indices are defined and used as the basis of weldability charts. For the case of constructional steels, a carbon equivalent characterises both heat affected zone hardenability and the maximum hardness developed after solid state phase transformations. The welding process is characterised by its energy input. A mathematical model is used to establish relationships between the indices, which are displayed on charts as contours of microstructure and hardness.

  10. CONTACT DERMATITIS AMONG CONSTRUCTION WORKERS

    Directory of Open Access Journals (Sweden)

    Ida Ayu Diah Purnama Sari

    2013-02-01

    Full Text Available Contact dermatitis is a form of skin inflammation with spongiosis or intercellular edema of the epidermis due to the interaction of irritants and allergens. While occupational contact dermatitis is an inflammation of the skin due to exposure to irritants or allergens in the workplace. One of the jobs that have a high risk of the disease are construction workers. Although the disease is rarely-threatening but can cause high morbidity and suffering for workers, so it can affect the economy and quality of life of patients.

  11. Arusha windmill: a construction manual

    Energy Technology Data Exchange (ETDEWEB)

    Stanley, D

    1977-01-01

    The advantages of the Arusha (Tanzania) low-cost windmill for rural communities in the Third World are described, and the history of its development is recounted. A description of the fan-bladed windmill's operation,d esign, cost, parts and materials, and tools required are given. The construction of such a windmill is described in extensive detail followed by discussions of the operation, maintenance and alterations of the windmill, pumps to be used with the windmill and other uses of the rotary power generated. Useful data and design formulae, a glossary and a unit conversion table are included.

  12. Core construction for nuclear reactors

    International Nuclear Information System (INIS)

    Pettinger, D.S.

    1977-01-01

    HTR core construction with prismatic graphite blocks piled into columns. The front of the blocks is concavely curved. The lines of contact of two blocks are always not vertical, i.e. the blocks of one column are supported by the blocks of neighbouring columns so that ducts are formed. Groups of three or four of these columns may additionally be arranged around a central column which has recesses in order to lock the blocks of one group together. With this arrangement, dimensional changes of the graphite blocks under operating conditions can be taken up. (DG) [de

  13. Parallel Construction of Irreducible Polynomials

    DEFF Research Database (Denmark)

    Frandsen, Gudmund Skovbjerg

    Let arithmetic pseudo-NC^k denote the problems that can be solved by log space uniform arithmetic circuits over the finite prime field GF(p) of depth O(log^k (n + p)) and size polynomial in (n + p). We show that the problem of constructing an irreducible polynomial of specified degree over GF(p) ...... of polynomials is in arithmetic NC^3. Our algorithm works over any field and compared to other known algorithms it does not assume the ability to take p'th roots when the field has characteristic p....

  14. Japanese experience in nuclear power plant construction

    International Nuclear Information System (INIS)

    Seko, T.

    1989-01-01

    Development of LWR in JAPAN started by introducing LWR from the U.S.A. Since then we have been improving existing technology and promoting domestic technology development based on experiences accumulated in Japan. As a result, recent operating performance has been excellent. As far as construction work is concerned, we also have been making our best efforts to improve the performance of construction work itself, with the cooperation of manufacturers. As for construction work, we have succeeded in improving the quality of construction work, shortening the construction period and reducing construction costs through new technology and Japanese-style work management

  15. Construction technique for a chemical plant (III)

    International Nuclear Information System (INIS)

    1978-08-01

    This book mentions design of instrumentation and construction for a chemical plant, which deals with the change of instrumentation, construction, choice of material test, construction of thermal insulation work for a chemical plant, about classification and main materials, the problems on construction, painting plan and construction for a chemical plant such as paint and painting, safety and hygiene, cleaning of a chemical plant on the time for washing and decision of the way of washing, start up test for a chemical plant such as introduction of the check, construction and repair.

  16. Toronto green roof construction standard

    International Nuclear Information System (INIS)

    Aster, D.

    2007-01-01

    Toronto City Council adopted a green roof strategy in February 2006. This paper reviewed the by-law governing the strategy as well as the work in progress to develop minimum standards for the design and construction of green roofs in Toronto. The strategy included a series of recommendations regarding the installation of green roofs on city buildings; a pilot grant program; using the development process to encourage green roofs; and, public education and promotion. It was noted that compared to Europe, the development of standards for green roofs in North America is in its early stages. As an emerging sustainable technology, there currently are no standards incorporated into Ontario's Building Code against which Toronto can measure the design and construction of green roofs. Therefore this paper included an analysis detailing how the recommended design requirements were able to support the City's green roof policy objectives and integrate the performance criteria for green roofs previously established and supported by Toronto City Council. The key policy objectives of the City's green roof strategy were to reduce the urban heat island effect; to address stormwater management implications in terms of quality and quantity; to improve the energy budgets of individual buildings; and, to improve air quality

  17. Sustainable construction in rural Guatemala.

    Science.gov (United States)

    Temple, Ericka K; Rose, Elizabeth

    2011-11-01

    Waste management is a significant problem in Guatemala, as elsewhere in the developing world. The inappropriate disposal of solid waste produces pollution and places the environment and human health at risk. Environmental risk factors, including inadequate disposal of solid waste, are implicated in 25-30% of disease worldwide with children bearing a disproportionate burden of those diseases. Therefore, economic development which reduces inappropriate disposal of waste and affords economic opportunities may help reduce the global burden of disease on children. In the indigenous highlands of central Guatemala, a community supported non-profit organisation called Long Way Home (http://www.longwayhomeinc.org) is employing alternative construction techniques to build a vocational school complex. The construction of the school from waste materials demonstrates the use and principles of re-purposing materials, helps clean the environment and affords further educational and vocational opportunities. This article will outline the health problems inherent in an indigenous area of a developing country and will offer an alternative solution to reverse environmental risk factors associated with solid waste pollution and also actively improve child health.

  18. Semiotics of constructed complex systems

    Energy Technology Data Exchange (ETDEWEB)

    Landauer, C.; Bellman, K.L.

    1996-12-31

    The scope of this paper is limited to software and other constructed complex systems mediated or integrated by software. Our research program studies foundational issues that we believe will help us develop a theoretically sound approach to constructing complex systems. There have really been only two theoretical approaches that have helped us understand and develop computational systems: mathematics and linguistics. We show how semiotics can also play a role, whether we think of it as part of these other theories or as subsuming one or both of them. We describe our notion of {open_quotes}computational semiotics{close_quotes}, which we define to be the study of computational methods of dealing with symbols, show how such a theory might be formed, and describe what we might get from it in terms of more interesting use of symbols by computing systems. This research was supported in part by the Federal Highway Administration`s Office of Advanced Research and by the Advanced Research Projects Agency`s Software and Intelligent Systems Technology Office.

  19. Occupational risk of building construction

    International Nuclear Information System (INIS)

    Aneziris, O.N.; Topali, E.; Papazoglou, I.A.

    2012-01-01

    This paper presents the quantification of occupational risk of a building construction project. Risk assessment is based on the Occupational Risk Model (ORCA) developed under the Workgroup Occupational Risk Model project (WORM), in the Netherlands, for quantifying occupational risk. This model assesses occupational risk of a worker, by taking into account his various tasks, activities and their hazards. Risk is evaluated for three types of consequences: recoverable injury, permanent injury and death. The occupational risk model is based on a set of 63 bowties, which assess risk owing to different hazards such as fall from ladder, scaffold, roofs, falling object, struck by moving vehicle, contact by moving parts, etc. ORCA calculates the risk profile of a building construction site, consisting of thirty-eight workers in different job positions, such as operators of excavators, loaders, compaction equipment, workers in excavation and framing phases, etc. All risk profiles of workers have been quantified and jobs have been ranked according to their risk. Workers installing timber formworks have the highest fatality risk (1.57×10 −3 /yr), followed by the workers installing reinforcement (1.52×10 −3 /yr).

  20. Construction and fitting of NUCEF

    International Nuclear Information System (INIS)

    Takeshita, Isao; Itahashi, Takayuki; Izawa, Naoki; Okazaki, Shuji

    1994-01-01

    NUCEF consists of two criticality experiment devices, three alpha-gamma cells, the experimental equipments contained in about 90 glove boxes and many others. The background and the course of the construction and fitting of NUCEF are described on the selection of important research, the rationalization of facilities, the integration of the criticality safety experiments facility(CSEF) and the TRU safety test facility(TRUST), the safety examination, and the construction and fitting. The whole NUCEF, the static criticality facility(STACY), the transient criticality facility(TRACY), the mock-up test of the machinery and equipment for both criticality facilities, the solution fuel preparation facility, cells and glove boxes and the equipment contained in them, the analysis facility consists of four analysis rooms, and the radioactive waste facility for gas, liquid and solid wastes are described. The classification of these facilities based on the relevant laws is shown. The way of thinking in the basic design and the detailed design is explained. The permission of nuclear reactor installation and the use of nuclear fuel substances was obtained. The design and the method of works were approved. The inspection is reported. The measures for the security are explained. (K.I.)

  1. Contributing factors in construction accidents.

    Science.gov (United States)

    Haslam, R A; Hide, S A; Gibb, A G F; Gyi, D E; Pavitt, T; Atkinson, S; Duff, A R

    2005-07-01

    This overview paper draws together findings from previous focus group research and studies of 100 individual construction accidents. Pursuing issues raised by the focus groups, the accident studies collected qualitative information on the circumstances of each incident and the causal influences involved. Site based data collection entailed interviews with accident-involved personnel and their supervisor or manager, inspection of the accident location, and review of appropriate documentation. Relevant issues from the site investigations were then followed up with off-site stakeholders, including designers, manufacturers and suppliers. Levels of involvement of key factors in the accidents were: problems arising from workers or the work team (70% of accidents), workplace issues (49%), shortcomings with equipment (including PPE) (56%), problems with suitability and condition of materials (27%), and deficiencies with risk management (84%). Employing an ergonomics systems approach, a model is proposed, indicating the manner in which originating managerial, design and cultural factors shape the circumstances found in the work place, giving rise to the acts and conditions which, in turn, lead to accidents. It is argued that attention to the originating influences will be necessary for sustained improvement in construction safety to be achieved.

  2. MAST Upgrade – Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Milnes, Joe, E-mail: Joe.Milnes@ccfe.ac.uk; Ayed, Nizar Ben; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O’Gorman, Tom; Scannell, Rory

    2015-10-15

    Highlights: • Outlines unique capability of MAST-U, including divertor and diagnostic capability. • Describes progress made in the manufacture and assembly of key MAST-U components. • Highlights the design challenges that have been overcome. • Lists the key lessons learned thus far in the project. - Abstract: The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: (1) testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); (2) adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and (3) exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.

  3. Constructing professional and organisational fields.

    Science.gov (United States)

    Gurney, Robert

    2016-01-01

    Purpose - The purpose of this paper is to fill an apparent gap in the literature addressing issues of leadership and change - the development and activities of constructing and leading sports sciences and medicine professions, and similarly, the construction and leadership of multidisciplinary/inter-disciplinary organisations that practice sports sciences and medicine. Design/methodology/approach - This study incorporated explorations through conducting both interviews and survey questionnaires with members of Sports Medicine Australia (SMA). The interviews (qualitative) were semi-structured and asked questions addressing what changed, why change and how change was implemented. Findings - The health sciences and medicine professions moving to specialised sports sciences and medicine disciplines and SMA, evolved through forces driving the need for change (legitimacy, resource dependency, positioning and core competencies). Practical implications - The knowledge developed from understanding activities of change that traditional professions conducted to become specialised Disciplines and parallel changes in a single Discipline organisation evolving to an umbrella organisation (SMA), comprised a membership of specialised Disciplines, can act as a catalyst for inquiry by other professional and organisational groups. Originality/value - The findings of this study contributes to the literature investigating change in professional and organisations fields. More specifically, this study promotes inquiry into leadership practices of sports sciences and medicine, as contributors to the field of health services.

  4. Construction contract revenue recording comparison

    Directory of Open Access Journals (Sweden)

    Hana Bohušová

    2008-01-01

    Full Text Available Publicly traded companies prepare their consolidated accounts in conformity with the international accounting standards (IAS/IFRS in accordance with the Regulation No. 1606/2002. This is obliged for all publicly traded joint-stock companies in the Czech Republic. Other companies prepare financial statements in accordance with national accounting standards. There are Accounting Act No. 563/1991 of Coll. and Regulation No. 500/2002 of Coll., Czech Accounting Standards in the Czech Republic. Both systems are based on different principles so there are many differences. The Czech Accounting System (CAS is based on the rules while IAS/IFRS are based on principles (Kovanicová, 2005. These differences are mainly caused by the different philosophy. CAS prefers the fiscal policy to the economic substance while IAS/IFRS prefere the economic substance. One of the most significant dif­fe­ren­ces is in the field of revenue recording. There are two standards concerning the revenues recording (IAS 18 − Revenue, IAS 11 – Construction Contracts in IAS/IFRS. CAS 019 – Expenses and Revenue are dealing with the revenue recording in the Czech Republic. The paper is aimed at the comparison of the methodical approaches for revenue recording used by IAS/IFRS and by CAS. The most important differences are caused by the different approach to the long term contracts (construction contracts, software development contracts revenues recording.

  5. Improving Indonesian Construction Consulting Services

    Directory of Open Access Journals (Sweden)

    Rizal Z. Tamin

    2015-05-01

    Full Text Available Indonesian construction consulting services are facing a complex problem in fulfilling the nation’s expectations regarding high quality infrastructure development and the construction industry’s competitiveness. A study of this problem and a formulation of solutions to improve the situation are presented in this paper. A survey was carried out in Jakarta, West Java, East Java, and North Sumatra provinces to collect data related to this problem. A focus group discussion and a workshop with all stakeholders were conducted to formulate improvement actions that need to be taken. It was revealed that the problems faced include, among others, the limited number of professional engineers compared to the number of national consultancy companies, the uneven distribution of engineers in Indonesian regions, an imperfect procurement system, and low-quality work output in general. Recommended actions include improvement of the government’s role in consulting services nurturing and facilitation, development of partnerships, and amelioration of the professional engineer and consultant certification system.

  6. Construction materials, monuments and environment

    Science.gov (United States)

    Prikryl, R.; Siegesmund, S.; Török, A.; Brimblecombe, P.; Gomez-Heras, M.

    2012-04-01

    Construction materials (natural stone, aggregates, bricks, cement, lime, mortar, etc.) form a wide and heterogeneous group both from the genetic and technological point of view. These materials deserve attention from the scientific community due to their long-term use, importance for society and sensitivity to the environment. Most geomaterials have also been used in important monuments designated as a part of the World Cultural Heritage and/or make part of national monuments. Despite of the wide-ranges of studies and our rapidly increasing understanding of material behaviour, our knowledge is still rather limited in many aspects. This concerns the characterisation of traditional raw materials, the knowledge of their processing and use, and/or durability and compatibility assessment. The exploitation and sustainable use of these materials are also new and emerging challenges in the modern society. The use of local materials for monuments can be considered as a part of our cultural and technological heritage, which has, however, significantly deteriorated during the past several decades. This paper summarizes the general topics related to a modern analysis of traditional construction materials derived from the Earth, and on the characteristic aspects of the behaviour of these materials on selected monuments.

  7. Seeking Constructive Synergy: Design Science and the Constructive Research Approach

    DEFF Research Database (Denmark)

    Piirainen, Kalle; Gonzalez, Rafael A.

    2013-01-01

    Information systems research and management science create knowledge which can be applied in organizations. Design science specifically aims at applying existing knowledge to solve interesting and relevant business problems and has been steadily gaining support in information systems research....... However, design science is not the only design-oriented framework. Accordingly, this raises the question of whether it is possible to compare the results obtained from different brands of design-oriented research. This paper contributes to answering this question by comparing two research approaches......, enabling mutual learning possibilities and suggesting improvements in transparency and rigor. The objective of this paper is to compare design science research with the constructive research approach. The conclusion is that the two approaches are compatible, save for details in practical requirements...

  8. Division of Mechanical Construction - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    1999-01-01

    The Department of Mechanical Construction consists of the Design Group and the Mechanical Workshop. The activity of the Department includes the following: designs of devices and equipment for experiments in physics and their mechanical construction and assembly, particularly vacuum chambers and installations for HV and UHV; maintenance and upgrading of the existing installations and equipment in our Institute; participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCad graphic software (release 12 and 13) what allows to make drawings and a mechanical documentation which meets world standards. Also ANSYS (version 5.2) - a software for mechanical, heat and magnetic calculations using finite-elements methods is used in our design activity. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. In 1998 the Department of Mechanical Construction designed, manufactured and assembled an equipment for the following foreign laboratories: Deutches Elektronen Synchrotron, Hamburg, FRG; Jagiellonian University, Cracow; Massachusetts Institute of Technology, Cambridge, Massachusetts, USA; University of Rochester. Rochester, NY, USA; Brookhaven National Laboratory, Upton, NY, USA. Besides the large designs and systems described below, some interesting works have been made for the departments of our Institute and other institutions: 1. The works for Cyclotron Section: The assembly of dipole magnet for extraction the cyclotron beam: - design and manufacturing of technological device for winding magnet coils; - winding of 16 coils; - manufacturing and assembly of magnet collars driving system; - design and manufacturing of vacuum chamber placed inside the magnet; - manufacturing of magnet cooling system; assembly of remachined magnet yoke and mentioned above units

  9. Utilization of unbound aggregates for road construction

    OpenAIRE

    Fladvad, Marit

    2017-01-01

    Crushed rock aggregate is a non-renewable resource of great interest in road construction and other branches of the construction industry. To prevent resource scarcity, utilization of aggregates should be considered carefully. © 2016 Norsk Bergforening

  10. Sustainable Management of Construction and Demolition Materials

    Science.gov (United States)

    This web page discusses how to sustainably manage construction and demolition materials, Information covers, what they are, and how builders, construction crews, demolition teams,and deign practitioners can divert C&D from landfills.

  11. An introduction to niche construction theory.

    Science.gov (United States)

    Laland, Kevin; Matthews, Blake; Feldman, Marcus W

    Niche construction refers to the modification of selective environments by organisms. Theoretical and empirical studies of niche construction are increasing in importance as foci in evolutionary ecology. This special edition presents theoretical and empirical research that illustrates the significance of niche construction to the field. Here we set the scene for the following papers by (1) discussing the history of niche construction research, (2) providing clear definitions that distinguish niche construction from related concepts such as ecosystem engineering and the extended phenotype, (3) providing a brief summary of the findings of niche construction research, (4) discussing the contribution of niche construction and ecological inheritance to (a) expanded notions of inheritance, and (b) the extended evolutionary synthesis, and (5) briefly touching on some of the issues that underlie the controversies over niche construction.

  12. Environment, Health, and Safety - Construction Subcontractors Documents |

    Science.gov (United States)

    NREL Environment, Health, and Safety - Construction Subcontractors Documents Environment Environment, Health and Safety (EH&S) requirements are understood by construction subcontractors and with these requirements before submitting proposals and/or environment, health and safety plans for the

  13. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  14. 874 CONSTRUCTION COST MODELS FOR HIGHRISE OFFICE ...

    African Journals Online (AJOL)

    USER

    2015-10-28

    Oct 28, 2015 ... will not only reduce the stress on estimators but also enhance the accuracy of cost estimates. The resulting 11 ... cost estimating process to work together to ..... construction estimators in Hong. Kong. Construction Management.

  15. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  16. EVALUATION OF CAUSES OF CONSTRUCTION MATERIAL WASTE

    African Journals Online (AJOL)

    Osondu

    factors contributing to construction material waste generation on building sites in Rivers State, ... the studied factors at every level of the construction processes and in their waste management plan. ..... Evaluation of Solid Waste in Building.

  17. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  18. Sustainable construction in remote cold regions.

    Science.gov (United States)

    2015-12-01

    The goal of this project was to identify sustainable construction techniques appropriate for remote and cold regions, some of which apply to : operations and maintenance as well. The vast body of literature regarding green construction in warm region...

  19. Anxiety, Construct Differentiation, and Message Production.

    Science.gov (United States)

    Shepherd, Gregory J.; Condra, Mollie B.

    1989-01-01

    Examines the nature of the construct differentiation/anxiety relationship in light of messages produced. Considers recent and complex conceptualizations of social-cognitive development and anxiety. Finds no significant relationship between state anxiety and construct differentiation. (MM)

  20. Validity of Sensory Systems as Distinct Constructs

    OpenAIRE

    Su, Chia-Ting; Parham, L. Diane

    2014-01-01

    Confirmatory factor analysis testing whether sensory questionnaire items represented distinct sensory system constructs found, using data from two age groups, that such constructs can be measured validly using questionnaire data.

  1. St. Laurent Construction Co., Inc. Information Sheet

    Science.gov (United States)

    St. Laurent Construction Co., Inc. (the Company) is located in Nashua, New Hampshire. The settlement involves renovation activities conducted at properties constructed prior to 1978, located in Merrimack and Nashua, New Hampshire.

  2. Construction machine control guidance implementation strategy.

    Science.gov (United States)

    2010-07-01

    Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...

  3. RA Construction KC, LLC Information Sheet

    Science.gov (United States)

    RA Construction KC, LLC (the Company) is located in Gladstone, Missouri. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Kansas City, Missouri.

  4. Effect of Pre-Construction on Construction Schedule and Client Loyalty

    OpenAIRE

    Jong Hoon Kim; Hyun-Soo Lee; Moonseo Park; Min Jeong; Inbeom Lee

    2016-01-01

    Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client sat...

  5. Lean Construction Supply Chain : A Literature Review

    OpenAIRE

    Ren, Jiamei

    2012-01-01

    The aim of this thesis is to enhance the management of supply systems in construction industry using lean principles. This study is an attempt to identify what kind of activities causes’ construction process delay and how to perform lean concept into supply chain in practice. The objective is to assure on-time delivery of information and materials to construction sites at lowest cost and maximum value for the customer. These study problems have been analysed from a lean construction supply ch...

  6. Constructive eHealth evaluation

    DEFF Research Database (Denmark)

    Høstgaard, Anna Marie Balling; Bertelsen, Pernille Scholdan; Nøhr, Christian

    2017-01-01

    Abstract Background: Information and communication sources in the healthcare sector are replaced with new eHealth technologies. This has led to problems arising from the lack of awareness of the importance of end-user involvement in eHealth development and of the difficulties caused by using...... traditional summative evaluation methods. The Constructive eHealth evaluation method (CeHEM) provides a solution to these problems by offering an evaluation framework for supporting and facilitating end-user involvement during all phases of eHealth development. The aim of this paper is to support this process...... by sharing experiences of the eHealth evaluation method used in the introduction of electronic health records (EHR) in the North Denmark Region of Denmark. It is the first time the fully developed method and the experiences on using the CeHEM in all five phases of a full lifecycle framework is presented...

  7. Constructive eHealth evaluation

    DEFF Research Database (Denmark)

    Høstgaard, Anna Marie Balling

    2016-01-01

    Despite the existence of an extensive body of knowledge about best practices and factors that contribute to the successful development and adoption of eHealth, many eHealth development-projects still face a number of problems - many of them of an organizational nature. This chapter presents a new...... method: “The Constructive eHealth evaluation method” aimed at supporting real end-user participation - a well-known success factor in eHealth development. It provides an analytical framework for achieving real end-user participation during the different phases in the eHealth lifecycle. The method...... was developed and used for the first time during the evaluation of an EHR planning process in a Danish region. It has proven effective for providing management at more levels on-going information and feedback from end-users, allowing management to change direction during eHealth development in order to achieve...

  8. JASMINE Simulator - construction of framework

    Science.gov (United States)

    Yamada, Yoshiyuki; Ueda, Seiji; Kuwabara, Takashi; Yano, Taihei; Gouda, Naoteru

    2004-10-01

    JASMINE is an abbreviation of Japan Astrometry Satellite Mission for INfrared Exploration currently planned at National Astronomical Observatory of Japan. JASMINE stands at a stage where its basic design will be determined in a few years. Then it is very important for JASMINE to simulate the data stream generated by the astrometric fields in order to support investigations of accuracy, sampling strategy, data compression, data analysis, scientific performances, etc. It is found that the new software technologies of Object Oriented methodologies with Unified Modeling Language are ideal for the simulation system of JASMINE (JASMINE Simualtor). In this paper, we briefly introduce some concepts of such technologies and explain the framework of the JASMINE Simulator which is constructed by new technologies. We believe that these technologies are useful also for other future big projects of astronomcial research.

  9. Polynomial weights and code constructions

    DEFF Research Database (Denmark)

    Massey, J; Costello, D; Justesen, Jørn

    1973-01-01

    polynomial included. This fundamental property is then used as the key to a variety of code constructions including 1) a simplified derivation of the binary Reed-Muller codes and, for any primepgreater than 2, a new extensive class ofp-ary "Reed-Muller codes," 2) a new class of "repeated-root" cyclic codes...... of long constraint length binary convolutional codes derived from2^r-ary Reed-Solomon codes, and 6) a new class ofq-ary "repeated-root" constacyclic codes with an algebraic decoding algorithm.......For any nonzero elementcof a general finite fieldGF(q), it is shown that the polynomials(x - c)^i, i = 0,1,2,cdots, have the "weight-retaining" property that any linear combination of these polynomials with coefficients inGF(q)has Hamming weight at least as great as that of the minimum degree...

  10. Constructing a Business Model Taxonomy

    DEFF Research Database (Denmark)

    Groth, Pernille; Nielsen, Christian

    2015-01-01

    the quality of business model taxonomy studies in the future are identified. Originality/Value: The paper highlights the benefits and potential implications of designing business model taxonomy studies and makes the case for ensuring the quality of future studies relating to e.g. performance. Reviewing......Abstract Purpose: The paper proposes a research design recipe capable of leading to future business model taxonomies and discusses the potential benefits and implications of achieving this goal. Design/Methodology/Approach: The paper provides a review of relevant scholarly literature about business...... models to clarify the subject as well as highlighting the importance of past studies of business model classifications. In addition it reviews the scholarly literature on relevant methodological approaches, such as cluster analysis and latent class analysis, for constructing a business model taxonomy...

  11. Constructing a European Governance Space

    DEFF Research Database (Denmark)

    Pontoppidan, Caroline Aggestam; Alijarde, Isabel Brusca; Chow, Danny

    Financial crisis has emphasized the need for harmonized public sector accounts in Europe. After a public consultation on the suitability of the IPSAS for EU Member States, the European Commission considers that the proper way is the development of European Union Standards adapted to IPSAS (renaming....... On the basis of that discussion, Eurostat launched another public consultation named; ‘Towards implementing European Public Sector Accounting Standards for EU member states-Public consultation on future EPSAS governance principles and structures’. This paper seeks to provide an in-depth understanding...... of the negotiations and interactions that took place prior to, during and after the issuance of the public consultation on the ‘Suitability of IPSAS’. The focus of this paper is therefore on a systematic analysis of the construction of regional-transnational governance of public sector accounting, using the EPSAS...

  12. Dam construction in salt rock

    International Nuclear Information System (INIS)

    Stockmann, N.; Beinlich, A.; Flach, D.; Jockwer, N.; Klarr, K.; Krogmann, P.; Miehe, R.; Schmidt, M.W.; Schwaegermann, H.F.; Walter, F.; Yaramanci, U.

    1991-11-01

    Barriers are a major component of the satefy concept for the Gorleben repository. The construction and performance of dams are currently tested within the framework of a project carried out in the Asse salt mine. A measuring programme has been established to give evidence of the sealing capacities of a barrier consisting of an abatement, long-term sealing material, and a hydraulic sealing system. Tests are to be made to verify the barrier's performance for shorter of long time periods (up to about 500 years). The tests are assisted by computed models established for the project. The long-term safety aspects to be studied include such conditions as permeability changes due to mechanical impacts, circulation conditions at the roadside, and the serviceable life and efficiency of the sealing components. (DG) [de

  13. Wood construction under cold climate

    DEFF Research Database (Denmark)

    Wang, Xiaodong; Hagman, Olle; Sundqvist, Bror

    2014-01-01

    As wood constructions increasingly use engineered wood products worldwide, concerns arise about the integrity of the wood and adhesives system. The glueline stability is a crucial issue for engineered wood application, especially under cold climate. In this study, Norway spruce (Picea abies...... affected shear strength of wood joints. As temperature decreased, the shear strength decreased. PUR resin resulted in the strongest shear strength at all temperatures tested. MF resin responded to temperature changes in a similar ways as the PUR resin. The shear strength of wood joints with EPI resins...... specimens need to be tested in further work to more completely present the issue. The EN 301 and EN 302 may need to be specified based on wood species....

  14. Studio Constructing an Archive - Modelkabinettet

    DEFF Research Database (Denmark)

    2012-01-01

    . This has, among other subjects, included an analysis of the architectural exhibition "OMA Progress" at the Barbican Arts Centre in London as well as OMA's architecture, design strategy and media usage. The study has been based on discussions of archives, collections and architecture exhibitions as cultural...... products, historiography, media and architectural representation. Based on the above studies, the students have developed their own projects, which reflect in a critical manner on exhibitions, archives and collections. In Studio Constructing an Archive we focus on architectural representation and its...... significance and influence on the development of architecture and our understanding of architecture. During the spring semester, we have, in particular, been discussing the model and its media characteristics....

  15. Creating constructive outcomes in conflict.

    Science.gov (United States)

    Orchard, B

    1998-06-01

    1. Conflict and disagreement are a fact of business life. Effort toward optomizing differences rather than minimizing them is a value added activity--leading to greater creativity, increasing levels of respect in relationships, and better solutions. 2. Proactively looking at potential conflict--where diasgreeing parties are often inherent and/or predictable--can save energy, relationships, and costly mistakes. Diagnosing or "reading" a situation and planning an approach is wise. 3. Several options or responses are available when facing conflict. Knowing when to use a given response is an important interpersonal skill. Relying on learned, habitual, and exclusive approaches to conflict may be limiting. 4. Implementation of effective conflict resolution is a function of attitude, initiative, and flexibility. An exploratory posture and a willingness to learn are constructive in attempting to reach agreements with optimum short and long term effect.

  16. Animated construction of line drawings

    KAUST Repository

    Fu, Hongbo

    2011-12-01

    Revealing the sketching sequence of a line drawing can be visually intriguing and used for video-based storytelling. Typically this is enabled based on tedious recording of artists\\' drawing process. We demonstrate that it is often possible to estimate a reasonable drawing order from a static line drawing with clearly defined shape geometry, which looks plausible to a human viewer. We map the key principles of drawing order from drawing cognition to computational procedures in our framework. Our system produces plausible animated constructions of input line drawings, with no or little user intervention. We test our algorithm on a range of input sketches, with varying degree of complexity and structure, and evaluate the results via a user study. We also present applications to gesture drawing synthesis and drawing animation creation especially in the context of video scribing.

  17. Animated construction of line drawings

    KAUST Repository

    Fu, Hongbo

    2011-12-01

    Revealing the sketching sequence of a line drawing can be visually intriguing and used for video-based storytelling. Typically this is enabled based on tedious recording of artists\\' drawing process. We demonstrate that it is often possible to estimate a reasonable drawing order from a static line drawing with clearly defined shape geometry, which looks plausible to a human viewer. We map the key principles of drawing order from drawing cognition to computational procedures in our framework. Our system produces plausible animated constructions of input line drawings, with no or little user intervention. We test our algorithm on a range of input sketches, with varying degree of complexity and structure, and evaluate the results via a user study. We also present applications to gesture drawing synthesis and drawing animation creation especially in the context of video scribing. © 2011 ACM.

  18. RFQ pole-tip construction

    International Nuclear Information System (INIS)

    Crandall, K.R.; Stovall, J.E.

    1981-01-01

    The success of the radio-frequency quadrupole (RFQ) proof-of-principle (POP) tests conducted in 1980 at Los Alamos have essentially guaranteed that the RFQ linac will be used in many accelerator projects soon. Several RFQs are already under construction at Los Alamos, and we expect to be designing and machining the vanes for several RFQs to be built at other installations. The technique for machining the vanes for the POP RFQ was developed by Williams and Potter. While retaining their basic approach, we have modified their technique for generating the data required by the milling machine from the parameters defining the vane shapes. The objective of this exercise has been to develop a generalized fabrication procedure that could be used in commercial machine shops

  19. The construction of normal expectations

    DEFF Research Database (Denmark)

    Quitzau, Maj-Britt; Røpke, Inge

    2008-01-01

    The gradual upward changes of standards in normal everyday life have significant environmental implications, and it is therefore important to study how these changes come about. The intention of the article is to analyze the social construction of normal expectations through a case study. The case...... concerns the present boom in bathroom renovations in Denmark, which offers an excellent opportunity to study the interplay between a wide variety of consumption drivers and social changes pointing toward long-term changes of normal expectations regarding bathroom standards. The study is problemoriented...... and transdisciplinary and draws on a wide range of sociological, anthropological, and economic theories. The empirical basis comprises a combination of statistics, a review of magazine and media coverage, visits to exhibitions, and qualitative interviews. A variety of consumption drivers are identified. Among...

  20. SYSTEMIC INNOVATION IN CONSTRUCTION: THE

    DEFF Research Database (Denmark)

    Jensen, Jens Stissing; Koch, Christian

    2007-01-01

    -based. This approach evaluates the outcome of the program against the main intentions formulated in the tender material. Drawing on systemic innovation theory an alternative evaluative approach is suggested which focuses on the build-up of organizational and institutional resources to support the development...... of an emerging ICT trajectory. While the result-based evaluation points to some weaknesses in the quality of the best-practice and cross-organizational elements of the case-material, the systemic approach point to some important sideeffects of the program, such as the stabilization and enrolment of the industry......This paper offers an evaluation of a best practice program called ‘Best in Construction’ (BiC) which aimed to identify and document cases of successful ICT use in the Danish construction industry. The program is evaluated using two different approaches. The first approach is result...

  1. Constructing an Educational Mars Simulation

    Science.gov (United States)

    Henke, Stephen A.

    2004-01-01

    January 14th 2004, President George Bush announces his plans to catalyst the space program into a new era of space exploration and discovery. His vision encompasses a robotics program to explore our solar system, a return to the moon, the human exploration of Mars, and to promote international prosperity towards our endeavors. We at NASA now have the task of constructing this vision in a very real timeframe. I have been chosen to begin phase 1 of making this vision a reality. I will be working on creating an Educational Mars Simulation of human exploration of Mars to stimulate interest and involvement with the project from investors and the community. GRC s Computer Services Division (CSD) in collaboration with the Office of Education Programs will be designing models, constructing terrain, and programming this simulation to create a realistic portrayal of human exploration on mars. With recent and past technological breakthroughs in computing, my primary goal can be accomplished with only the aid of 3-4 software packages. Lightwave 3D is the modeling package we have selected to use for the creation of our digital objects. This includes a Mars pressurized rover, rover cockpit, landscape/terrain, and habitat. Once we have the models completed they need textured so Photoshop and Macromedia Fireworks are handy for bringing these objects to life. Before directly importing all of this data into a simulation environment, it is necessary to first render a stunning animation of the desired final product. This animation with represent what we hope to capture out of the simulation and it will include all of the accessories like ray-tracing, fog effects, shadows, anti-aliasing, particle effects, volumetric lighting, and lens flares. Adobe Premier will more than likely be used for video editing and adding ambient noises and music. Lastly, V-Tree is the real-time 3D graphics engine which will facilitate our realistic simulation. Additional information is included in the

  2. Design and Construction of Onkalo

    International Nuclear Information System (INIS)

    Vira, Juhani

    2014-01-01

    The principal objectives set to the ONKALO design were: 1- to enable the underground characterization of the actual host rock of the repository, and, barring unexpected negative results, the final confirmation of the site suitability; 2- to enable in situ testing and demonstration of repository technologies and work processes in realistic conditions, with the main constraints that it should be built in a way that the characteristics of the host rock important for long term safety were not compromised, and it should be built as if it were a nuclear facility. The first of the constraints came directly from the regulations. The second constraint had particular implications to quality management, safety classification of systems and structures, application of safeguards. Posiva had applied an ISO 9001 quality assurance system for all its previous R and D work, but now the QA system needed to be extended to the design and construction work and it should comply with the regulatory QA requirements. However, on the details of QA the existing YVL Guide on quality assurance largely referred to IAEA's safety guides. What came up handy at that time was a comparison, made by IAEA, between ISO based QA and IAEA's safety guides. It showed that the differences were actually small and comprised mainly of the graded approach based on safety meaning, and the role of a responsible facility manager, which were not included in the ISO 9001 based QA system. Posiva decided to continue with the ISO based quality management revamped with additional features from IAEA safety guidelines. This paper describes the management of Onkalo design and construction, and the current experience notably concerning some control procedures implemented for long-term safety

  3. Construction Cost Management in Resource Based Economy

    OpenAIRE

    Elazzazy, Muhammad

    2017-01-01

    Resource Based Economy tested according to criteria formulated from the construction cost management best practices. A cost management plan modeled to demonstrate the possibility of construction management under a new socio-economic system, which counts the consumed natural resources by construction as the dry cost to the environment.

  4. SPECIFICITY IN DEVELOPMENT OF CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    O. S. Golubova

    2012-01-01

    Full Text Available Specificity in development of construction industry of the Republic of Belarus determines  character of competition on the construction market, forms a pricing, marketing and product policy of building companies. Construction represents itself as a highly developed complex where interaction of business entities is of rather complicated multilateral character.

  5. A proof theory for constructive default logic

    NARCIS (Netherlands)

    Y-H. Tan (Yao-Hua)

    1993-01-01

    textabstractWe present what we call Constructive Default Logic (CDL) - a default logic in which the fixed-point definition of extensions is replaced by a constructive definition which yield so-called constructive extensions. Selection functions are used to represent explicitly the control of the

  6. Alignment of Partnering with Construction IT

    Directory of Open Access Journals (Sweden)

    Eleni Papadonikolaki

    2017-11-01

     As the construction industry evolves into an information-driven sector, the alignment of construction IT with inter-organisational management is preeminent for managing the inherent complexities of the industry. In parallel, embracing inter-organisational approaches for information management such as BIM is a promisingway forward for SCM and construction management.

  7. The Relevance of Causal Social Construction

    Directory of Open Access Journals (Sweden)

    Marques Teresa

    2017-02-01

    Full Text Available Social constructionist claims are surprising and interesting when they entail that presumably natural kinds are in fact socially constructed. The claims are interesting because of their theoretical and political importance. Authors like Díaz-León argue that constitutive social construction is more relevant for achieving social justice than causal social construction. This paper challenges this claim. Assuming there are socially salient groups that are discriminated against, the paper presents a dilemma: if there were no constitutively constructed social kinds, the causes of the discrimination of existing social groups would have to be addressed, and understanding causal social construction would be relevant to achieve social justice. On the other hand, not all possible constitutively socially constructed kinds are actual social kinds. If an existing social group is constitutively constructed as a social kind K, the fact that it actually exists as a K has social causes. Again, causal social construction is relevant. The paper argues that (i for any actual social kind X, if X is constitutively socially constructed as K, then it is also causally socially constructed; and (ii causal social construction is at least as relevant as constitutive social construction for concerns of social justice. For illustration, I draw upon two phenomena that are presumed to contribute towards the discrimination of women: (i the poor performance effects of stereotype threat, and (ii the silencing effects of gendered language use.

  8. Formation of optimal construction fleet composition

    Science.gov (United States)

    Tuskaeva, Zalina

    2017-10-01

    Machinery supply and its rational use in construction processes considerably determine the final product of construction organizations. Therefore, the problem of defining the type size composition of the construction fleet as one of the lowest material-intensive productions, is of a particular importance.

  9. Efficient Representation for Online Suffix Tree Construction

    DEFF Research Database (Denmark)

    Larsson, N. Jesper; Fuglsang, Kasper; Karlsson, Kenneth

    2014-01-01

    of branch lookup operations (known to be a bottleneck in construction time) with some additional techniques to reduce construction cost. We discuss various effects of our approach and compare it to previous techniques. An experimental evaluation shows that we are able to reduce construction time to around...

  10. Method of constructing an improved electrochemical cell

    Science.gov (United States)

    Grimes, Patrick G.; Einstein, Harry

    1984-10-09

    An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

  11. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  12. 23 CFR 710.311 - Construction advertising.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Construction advertising. 710.311 Section 710.311...-WAY AND REAL ESTATE Project Development § 710.311 Construction advertising. The State must manage real... advertising for construction, the State shall develop ROW availability statements and certifications related...

  13. Construal operations of the English progressive construction

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    2011-01-01

    present paper provides an overview of construal operations that are likely to be at play in the construction of the aspectual and actional meaning components of the progressive construction. The discussion also involves instances of the progressive construction, which display low semantic compatibility...

  14. 9 CFR 91.20 - General construction.

    Science.gov (United States)

    2010-01-01

    ... of construction materials such as wood, metal plate, or pipe may be used for stalls, crates, or pens... accessible to animals. A combination of wood and steel pipe or other steel profile construction may be... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false General construction. 91.20 Section 91...

  15. Construction Analysis during the Design Process

    NARCIS (Netherlands)

    Vries, de B.; Harink, J.M.J.; Martens, B.; Brown, A.

    2005-01-01

    4D CAD systems are used by contractors for visually checking the construction process. To enable simulation of the construction process, the construction planner links building components from a CAD model with the activities from a project planning. In this paper we describe a method to generate a

  16. 46 CFR 190.07-10 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Construction. 190.07-10 Section 190.07-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Structural Fire Protection § 190.07-10 Construction. (a) The hull, superstructure, structural...

  17. 46 CFR 92.20-15 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Construction. 92.20-15 Section 92.20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS CONSTRUCTION AND ARRANGEMENT Accommodations for Officers and Crew § 92.20-15 Construction. All crew spaces are to be...

  18. 46 CFR 168.15-10 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Construction. 168.15-10 Section 168.15-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS CIVILIAN NAUTICAL SCHOOL VESSELS Accommodations § 168.15-10 Construction. (a) The accommodations provided must be securely constructed, properly...

  19. 46 CFR 160.002-4 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.002-4 Section 160.002-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and 5 § 160.002-4 Construction. (a) General. This specification covers life preservers which...

  20. 42 CFR 136.110 - Facilities construction.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Facilities construction. 136.110 Section 136.110..., DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of Facilities and Services § 136.110 Facilities construction. In addition to other requirements of this subpart...

  1. 48 CFR 53.236-1 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Construction. 53.236-1... AND FORMS FORMS Prescription of Forms 53.236-1 Construction. The following forms are prescribed, as stated below, for use in contracting for construction, alteration, or repair, or dismantling, demolition...

  2. 46 CFR 190.20-15 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Construction. 190.20-15 Section 190.20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Accomodations for Officers, Crew, and Scientific Personnel § 190.20-15 Construction. All crew...

  3. 21 CFR 211.65 - Equipment construction.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS... construction. (a) Equipment shall be constructed so that surfaces that contact components, in-process materials...

  4. 46 CFR 161.012-7 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 161.012-7 Section 161.012-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Personal Flotation Device Lights § 161.012-7 Construction. (a...

  5. 46 CFR 160.174-9 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.174-9 Section 160.174-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Thermal Protective Aids § 160.174-9 Construction. (a) General...

  6. 46 CFR 92.07-10 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Construction. 92.07-10 Section 92.07-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS CONSTRUCTION AND ARRANGEMENT Structural Fire Protection § 92.07-10 Construction. (a) The hull, superstructure, structural...

  7. 46 CFR 160.005-4 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.005-4 Section 160.005-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS...), Models 52 and 56 § 160.005-4 Construction. (a) General. This specification covers life preservers which...

  8. 47 CFR 22.1035 - Construction period.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Construction period. 22.1035 Section 22.1035 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Offshore Radiotelephone Service § 22.1035 Construction period. The construction period (see § 22.142) for...

  9. 34 CFR 76.662 - Construction.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Construction. 76.662 Section 76.662 Education Office of... State and Its Subgrantees? Participation of Students Enrolled in Private Schools § 76.662 Construction. A subgrantee shall insure that program funds are not used for the construction of private school...

  10. 46 CFR 160.171-9 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.171-9 Section 160.171-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Immersion Suits § 160.171-9 Construction. (a) General. Each...

  11. 48 CFR 1522.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Construction. 1522.804-2 Section 1522.804-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SOCIOECONOMIC... Construction. Each contracting office having construction contract responsibility shall maintain a list of...

  12. 46 CFR 160.042-3 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.042-3 Section 160.042-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Skids, Liferaft, for Merchant Vessels § 160.042-3 Construction...

  13. 48 CFR 422.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction. 422.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Equal Employment Opportunity 422.804-2 Construction. The HCA shall ensure that each contracting office, awarding nonexempt construction contracts, maintains a...

  14. 46 CFR 108.235 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Construction. 108.235 Section 108.235 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.235 Construction. (a) Each helicopter deck must be...

  15. 46 CFR 151.40-5 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Construction. 151.40-5 Section 151.40-5 Shipping COAST... LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-5 Construction. Construction of machinery or equipment, such as heat exchangers, condensers, piping, etc., associated with...

  16. 29 CFR 1910.12 - Construction work.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false Construction work. 1910.12 Section 1910.12 Labor... Construction work. (a) Standards. The standards prescribed in part 1926 of this chapter are adopted as... provisions thereof, to every employment and place of employment of every employee engaged in construction...

  17. 48 CFR 922.804-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction. 922.804-2... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITION Equal Employment Opportunity 922.804-2 Construction. (a) Construction contracts, including cost-sharing contracts, are subject to OFCCP orders applicable in particular...

  18. 23 CFR 650.209 - Construction.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 650.209 Section 650.209 Highways FEDERAL..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.209 Construction. (a) Permanent erosion and sediment control measures and practices shall be established and...

  19. 23 CFR 645.115 - Construction.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 645.115 Section 645.115 Highways FEDERAL... Relocations, Adjustments, and Reimbursement § 645.115 Construction. (a) Part 635, subpart B, of this title, Force Account Construction (justification required for force account work), states that it is cost...

  20. 36 CFR 14.29 - Timely construction.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Timely construction. 14.29...-OF-WAY Procedures § 14.29 Timely construction. (a) Unless otherwise provided by law, a period of up to five years from the date a right-of-way is granted is allowed for completion of construction...

  1. 46 CFR 151.15-3 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Construction. 151.15-3 Section 151.15-3 Shipping COAST... LIQUID HAZARDOUS MATERIAL CARGOES Tanks § 151.15-3 Construction. This section lists the requirements for construction of the types of cargo tanks defined in § 151.15-1. (a) Gravity type tanks. Gravity type cargo...

  2. 46 CFR 160.056-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.056-2 Section 160.056-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boat § 160.056-2 Construction. (a) General. Rescue boats...

  3. 46 CFR 160.017-13 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.017-13 Section 160.017-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Chain Ladder § 160.017-13 Construction. (a) General. Each chain...

  4. 46 CFR 160.047-4 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.047-4 Section 160.047-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and Child § 160.047-4 Construction. (a) General. This specification covers buoyant vests which...

  5. 46 CFR 160.176-9 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.176-9 Section 160.176-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-9 Construction. (a) General...

  6. 40 CFR 40.115-1 - Construction.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Construction. 40.115-1 Section 40.115-1... DEMONSTRATION GRANTS § 40.115-1 Construction. May include the preliminary planning to determine the economic and... action necessary to the construction of a facility, the erection, acquisition, alteration, remodeling...

  7. Constructive Empiricism and Model Nominalism. | Udokang | Sophia ...

    African Journals Online (AJOL)

    James Ladyman has argued that constructive empiricism entails modal realism, and that this renders constructive empiricism untenable. We maintain that constructive empiricism is compatible with modal nominalism. Although the central term “observable” has been analyzed in terms of counterfactuals, and in general ...

  8. BASES OF CONSTRUCTIVITY OF MODERN PERSONALITY

    Directory of Open Access Journals (Sweden)

    Natalya Petrovna Shatalova

    2014-11-01

    Full Text Available Formation of bases of constructibility is important process at this stage of de-velopment of our state. Personality of modern type must be capable to self-determination, competent adoption of constructive decisions and manifestation of a personal responsibility for the constructive election, personality of modern type must be capable for self-determination, competent adoption of constructive decisions and manifestation to a personal responsibility for the constructive choice. Formation of bases of constructibility in the course of education is caused by use of constructive tasks and the constructive educational environment which define innovative recep-tions and skills of influence as methods of pedagogical influence taking into account constantly changing circumstances. Extent of mastering each member of society bases of constructibility defines a spiritual condition of society, of the present and the future of our country, development of economy and culture in general.Purpose: consideration of question about development of constructive thinking and constructive skills of personality in modern constructive educational environ-ment.Methodology: formal pedagogical method, the theoretical modeling, the meth-od of participant observation.Results. In the article is give the short analysis of problem of development of personality in modern society, opened the concept of constructibility of the personali-ty and her basic components, classification constructive tasks investigated, specified preparatory steps for organization of the conditions of development of a constructibil-ity and gives a brief description of their. Article has the scientific value as contains au-thor's generalizations possessing scientific novelty and the conclusions directed on disclosure of problems of formation and development of the modern personality, considered from the point of view of the theory of democratic constructivism in edu-cation.Practical implications: pedagogical

  9. Automatic Construction by Contour Crafting Technology

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Khorramshahi

    2017-07-01

    Full Text Available Contour Crafting is a novel technology in construction industry based on 3D printing that uses robotics to construct free form building structures by repeatedly laying down layers of material such as concrete. It is actually an approach to scale up automatic fabrication from building small industrial parts to constructing buildings. However, there are little information about contour crafting (CC in current use; present paper aims to describe the operational steps of creating a whole building by the machine reviewing relevant literature. Furthermore, it will represent the advantages of CC usage compared to traditional construction methods, as well as its applicability in construction industry.

  10. Division of Mechanical Construction - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2000-01-01

    Full text: The Department of Mechanical Construction consists of the Design Group and the Mechanical Workshop. The activity of the Department includes the following:- designs of devices and equipment for experiments in physics and their mechanical construction and assembly, particularly vacuum chambers and installations for HV and UHV; - maintenance and upgrading of the existing installations and equipment in our Institute; - participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCad graphic software (release 12 and 13) what allows to make drawings and a mechanical documentation which meets world standards. Also ANSYS (version 5.2) - a software for mechanical, heat and magnetic calculations using finite-elements methods is used in our design activity. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. The Workshop offers the following possibilities: - turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc-type elements of a diameter up to 600 mm and a length not exceeding 300 mm; - milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm; - grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm; - drilling - holes of a diameter up to 50 mm; - welding - electrical and gas welding, including TIG vacuum-tight welding; - soft and hard soldering; - mechanical works including precision engineering; - plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides; - painting - paint spraying with possibility of using furnace-fired drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our

  11. Management of construction safety at RR site

    International Nuclear Information System (INIS)

    Pathak, B.C.; Khatsuriya, J.R.

    2016-01-01

    Construction industries are one of the most hazardous industries and hence, promotion of safety remains one of the greatest challenges facing construction industry today. According to ILO estimates: Each year at least 60,000 fatal accidents occur on construction sites around the world or one fatal accident every ten minutes. One in six fatal accidents at work occurs on a construction site. In industrialized countries, as many as 25-40 per cent of work related deaths occur on construction sites, even though the sector employs only 6-10 per cent of the workforce. The number of fatalities occurring from construction work in India is also quite disturbing. Though, the fall of person from height and through openings were the major causes for fatal /serious accidents, the risk of fatal accident involving material handling equipment, either during handling or its maintenance is also significantly high due to use of large number of material handling equipments during construction work. (author)

  12. Potential and Benefits of Building Information Modeling (BIM During Pre-Construction, Construction and Post Construction Stage

    Directory of Open Access Journals (Sweden)

    Aw Nien Wei

    2017-11-01

    Full Text Available The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology currently used in the construction industry is the AutoCAD (Automatic computeraided design. AutoCAD is a commercial software application for 2D and 3D computer-aided design (CAD and drafting develop by Autodesk. Generally, all the drawing design from Autocad will be exchanged among the stakeholder in the form of paper. Information exchanged among them mostly involves a lot of documents and drawings. This practice creates errors because of documents and drawings are mostly in a paper-based format that is not properly managed which results in miscommunication among them. Having wrong information in the construction process could hinder the productivity of projects because in a construction project information is one of the important construction materials. Building Information Modeling (BIM is one of the newly software in the architecture, engineering, and construction (AEC industries to ensure all parties receive the right information. BIM technology is also an intelligent model of a building constructed digitally in the way of 3D. The software will generate model containing the information needed to support the construction, fabrication, and procurement activities that needed to realize the building. This paper will discuss on potential and benefits of BIM during pre-construction stage, construction stage and during post construction stage

  13. Dementia: sociological and philosophical constructions.

    Science.gov (United States)

    Davis, Daniel H J

    2004-01-01

    This analysis presents a challenge to the biomedical view of dementia as a disease. This view is critiqued from two perspectives: those of sociology and philosophy. Because these domains inform the creation of the medical discourse, their analysis provides an important refinement to the apprehension of the phenomenon of dementia. From the work of Foucault, and in particular his analysis of the historical origins of modern medicine, the sociological construction of dementia is considered. Following this, the philosophical question of Being is discussed, considering particularly the positions of Heidegger and Merleau-Ponty. Lastly aspects of dementia nursing that are damaging to those relatives forced to take on the role of primary carer are isolated, in the context of Kitwood's view that it is possible to maintain personhood at the extremes of this condition. It is suggested that this critique of sociological and philosophical foundations of dementia might offer a way of approaching the dismantling of the self and revise current conceptions of dementia care for the better.

  14. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Dommke, J.; Jurgutat, H.

    1980-01-01

    During the time of planing and construction of a nuclear power plant, the following proceeding is approved: - the deliverer of a nuclear power plant provides the reports fixing the quality assurance program, it means that he is responsible to write the safety analysis report, the specifications for the erection of the components, the working manuals and specifications for testing (eg nondestr. testing) - the manufacturing of components or systems will be controlled by an own independent quality assurance group, provided that this group was checked by the quality assurance group of the applicant - the TUeV with its independent assessors will fix the requirements relating to quality assurance in its assessment. On this basis the examination of the applicants specifications, working manuals, testing specifications will be done. The efficiency of quality assurance at the manufacturer and at the applicant will be checked by the TUeV specialists by considering specifications of modifications, repairs or tolerances. A mean point of the quality assurance in Germany is the dynamic adjustment, of an action on the latest state of engineering or science. If there exists a change of rules or guidelines, the quality assurance requirements have to be fit on this state in so far as it is feasible from the technical point of view. (orig./RW)

  15. New home construction: Eric Allen

    Energy Technology Data Exchange (ETDEWEB)

    1987-02-01

    This report describes some special energy efficient measures incorporated in the construction of a modestly-priced two and a half storey frame house with a floor area of 108 m{sup 2}. The house was built facing south, on a south-sloping lot with a thick stand of Jack Pine on the north side. The major energy efficient measures are: continuous air-vapour barrier and high insulation level to make the house as air-tight as possible; the use of passive solar heat which is expected to supply 37% of the annual heating requirements; a crawlspace plenum which draws hot air from the top of the house and recirculates it under the first floor; and use of horizontal strapping on which all wall partitions, electrical and plumbing work was done in order not to break the continuous air-vapour barrier and which itself provides extra insulation. The cost of making the house energy efficient was $2,500. The price of the house on completion was projected to be $65,000. The cost for the energy efficiency measures is 4% of the total. The Allen house is a good example of how an investment of a small percentage of the total cost, and about 67 hours of work, can result in an energy efficient house. The resulting savings on energy bills can be quite significant and can mean a return on the investment within 5 years. 3 figs., 1 tab.

  16. DNA recognition by synthetic constructs.

    Science.gov (United States)

    Pazos, Elena; Mosquera, Jesús; Vázquez, M Eugenio; Mascareñas, José L

    2011-09-05

    The interaction of transcription factors with specific DNA sites is key for the regulation of gene expression. Despite the availability of a large body of structural data on protein-DNA complexes, we are still far from fully understanding the molecular and biophysical bases underlying such interactions. Therefore, the development of non-natural agents that can reproduce the DNA-recognition properties of natural transcription factors remains a major and challenging goal in chemical biology. In this review we summarize the basics of double-stranded DNA recognition by transcription factors, and describe recent developments in the design and preparation of synthetic DNA binders. We mainly focus on synthetic peptides that have been designed by following the DNA interaction of natural proteins, and we discuss how the tools of organic synthesis can be used to make artificial constructs equipped with functionalities that introduce additional properties to the recognition process, such as sensing and controllability. Copyright © 2011 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  17. Construction design of apple sorter

    Directory of Open Access Journals (Sweden)

    Nieoczym Aleksander

    2018-01-01

    Full Text Available When assessing the quality of fruit and packaging process, fruit-producing farms owners decide to evaluate fruit by people or automated sorting lines. The purchase of an automated sorting line generates high costs for the company, but it brings benefits in the form of increased work efficiency, and the better organization of fruit packaging and storage processes. The use of that machinery and equipment is common in agricultural farms as well as in fruit and vegetable processing companies. Despite the widespread use of various types of fruit sorters, the analysis of the operation of the designed device and the study of its technological parameters is still a current research problem. During operation of the devices for sorting fruit there are many technical problems affecting technological processes and quality of fruits. In order to improve the efficiency of sorting fruit, this process should be quickly and accurately. The purpose of this paper is to present the automated apple sorter line construction design, and software for quality controlling fruits. Selected elements of the sorter structure including endurance calculation using the Finite Element Method (FEM and fruit control system using image analysis were presented.

  18. Wanting, liking, and preference construction.

    Science.gov (United States)

    Dai, Xianchi; Brendl, C Miguel; Ariely, Dan

    2010-06-01

    According to theories on preference construction, multiple preferences result from multiple contexts (e.g., loss vs. gain frames). This implies that people can have different representations of a preference in different contexts. Drawing on Berridge's (1999) distinction between unconscious liking and wanting, we hypothesize that people may have multiple representations of a preference toward an object even within a single context. Specifically, we propose that people can have different representations of an object's motivational value, or incentive value, versus its emotional value, or likability, even when the object is placed in the same context. Study 1 establishes a divergence between incentive value and likability of faces using behavioral measures. Studies 2A and 2B, using self-report measures, provide support for our main hypothesis that people are perfectly aware of these distinct representations and are able to access them concurrently at will. We also discuss implications of our findings for the truism that people seek pleasure and for expectancy-value theories.

  19. CONSTRUCTING ACCOUNTING UNCERTAINITY ESTIMATES VARIABLE

    Directory of Open Access Journals (Sweden)

    Nino Serdarevic

    2012-10-01

    Full Text Available This paper presents research results on the BIH firms’ financial reporting quality, utilizing empirical relation between accounting conservatism, generated in created critical accounting policy choices, and management abilities in estimates and prediction power of domicile private sector accounting. Primary research is conducted based on firms’ financial statements, constructing CAPCBIH (Critical Accounting Policy Choices relevant in B&H variable that presents particular internal control system and risk assessment; and that influences financial reporting positions in accordance with specific business environment. I argue that firms’ management possesses no relevant capacity to determine risks and true consumption of economic benefits, leading to creation of hidden reserves in inventories and accounts payable; and latent losses for bad debt and assets revaluations. I draw special attention to recent IFRS convergences to US GAAP, especially in harmonizing with FAS 130 Reporting comprehensive income (in revised IAS 1 and FAS 157 Fair value measurement. CAPCBIH variable, resulted in very poor performance, presents considerable lack of recognizing environment specifics. Furthermore, I underline the importance of revised ISAE and re-enforced role of auditors in assessing relevance of management estimates.

  20. CERN Pensions: A constructive proposal

    CERN Multimedia

    Staff Association

    2014-01-01

      A new endangering of the Pension Fund   In 2010 and 2011 Council adopted a package of measures (see Echo 195 for background information) that commits staff, retirees and the Organization to all contribute to the balancing of the Pension Fund by 2041. In particular, CERN’s Member States agreed to pay a special contribution of 60 MCHF per year for 30 years or until full funding is achieved, if this arrives sooner. Today, less than four years later, some Member States already want to find ways to come back on their commitment. The fact that one of the parties that accepted the package wants to change its commitment unilaterally is in evident disagreement with the 2011 Council resolution(1)  and therefore unacceptable. Nevertheless to be helpful we put forward a constructive proposal. Special contribution or...   Currently the Fund has a yearly outflow of around 300 MCHF to pay pension benefits of which some 60 MCHF (approximately 20% of pensions received) a...

  1. What Should Guide Reality Construction?

    DEFF Research Database (Denmark)

    Ravn, Ib

    1991-01-01

    The constructivist movement in the social sciences (Berger & Luckmann, Gergen) argues that social institutions are the constructions of a community of human agents. This implies that people possess the power to radically change those institutions. This raises what may be called the values problem...... ethical positions (relativism and absolutism) as distorted or degenerate cases of an ideal case, characterized by unity-in-diversity. This model is offered as a framework for a discussion of the values problem in constructivism, particularly in social research....... in the scientific community, whereas in the general community it is at least acknowledged as an issue. The values problem in constructivism has been addressed by a number of writers in second-order cybernetics, who offer reflections on ethics and values that are quite tentative and call for further elaboration....... The remainder of the chapter is an attempt to provide a broader context for a constructivist discussion of values and ethics. To do this I discuss the concept of the "implicate order," an ontological framework proposed by the theoretical physicist David Bohm (1980b). As will be shown, this ontology implies...

  2. 77 FR 49741 - Cranes and Derricks in Construction: Demolition and Underground Construction

    Science.gov (United States)

    2012-08-17

    ..., subpart CC, to replace the earlier rule (Sec. 1926.550) for all construction work.\\1\\ In proposing the new... derricks used in construction work. For most construction work, the final rule replaced a prior cranes and... construction work. Through this proposed rule, OSHA is proposing to apply the updated requirements to that work...

  3. 77 FR 49722 - Cranes and Derricks in Construction: Demolition and Underground Construction

    Science.gov (United States)

    2012-08-17

    ... underground construction work. Therefore, when OSHA promulgates a new final rule, states and territories with... used in construction work. For most construction work, the final rule replaced a prior cranes and... construction work. Through this direct final rule, OSHA is applying the updated requirements to that work. With...

  4. State of the art on construction automation and robotic system in domestic and foreign construction industry

    International Nuclear Information System (INIS)

    Lee, Sung Uk; Seo, Yong Chil; Jung, Seung Ho; Cho, Jai Wan; Choi, Young Soo

    2007-08-01

    In this report, we review the existing concept of construction automation and also survey the state of the art on construction automation and robotic system in domestic and foreign construction industry. On the basis of the result of review and survey, we want to suggest an applicable robotic technology to construction industry and points to be duly considered for activating construction automation. We investigate the state of the art on construction automation and robotic system in domestic and foreign construction industry and also applicable area and direction of domestic construction automation and robotic system. We hope that construction automation and robotic technology, which are improved rapidly nowadays, can contribute to the growth of construction industry

  5. Potential and Benefits of Building Information Modeling (BIM) During Pre-Construction, Construction and Post Construction Stage

    OpenAIRE

    Aw Nien Wei; Md Azree Othuman Mydin

    2017-01-01

    The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology current...

  6. Prospective safety performance evaluation on construction sites.

    Science.gov (United States)

    Wu, Xianguo; Liu, Qian; Zhang, Limao; Skibniewski, Miroslaw J; Wang, Yanhong

    2015-05-01

    This paper presents a systematic Structural Equation Modeling (SEM) based approach for Prospective Safety Performance Evaluation (PSPE) on construction sites, with causal relationships and interactions between enablers and the goals of PSPE taken into account. According to a sample of 450 valid questionnaire surveys from 30 Chinese construction enterprises, a SEM model with 26 items included for PSPE in the context of Chinese construction industry is established and then verified through the goodness-of-fit test. Three typical types of construction enterprises, namely the state-owned enterprise, private enterprise and Sino-foreign joint venture, are selected as samples to measure the level of safety performance given the enterprise scale, ownership and business strategy are different. Results provide a full understanding of safety performance practice in the construction industry, and indicate that the level of overall safety performance situation on working sites is rated at least a level of III (Fair) or above. This phenomenon can be explained that the construction industry has gradually matured with the norms, and construction enterprises should improve the level of safety performance as not to be eliminated from the government-led construction industry. The differences existing in the safety performance practice regarding different construction enterprise categories are compared and analyzed according to evaluation results. This research provides insights into cause-effect relationships among safety performance factors and goals, which, in turn, can facilitate the improvement of high safety performance in the construction industry. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    Science.gov (United States)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  8. COUNTERBALANCING BENEFITS AND DRAWBACKS OF CONTEMPORARY STABLISED EARTH CONSTRUCTION BY CONSTRUCTION PROFESSIONALS

    Directory of Open Access Journals (Sweden)

    Mohammad Sharif Zami

    2011-07-01

    Full Text Available It is debatable among the construction professionals whether contemporary stabilised earth construction is beneficial in urban low cost housing. Existing literature recorded a lot of benefits and drawbacks from construction professionals, which is empirically substantiated. But there are drawbacks found in the literature that seemingly are conflicting, and construction professionals are divided in their opinion. This paper seeks to address these conflicts and division by validating the controversial drawbacks of contemporary stabilised earth construction in urban low cost housing.

  9. Sustainable construction : towards a strategic approach to construction material management for waste reduction

    OpenAIRE

    Abarca Guerrero, L.; Scheublin, F.J.M.; Egmond - de Wilde De Ligny, van, E.L.C.; Lambert, A.J.D.

    2008-01-01

    The construction sector plays a key role in shaping and developing the built environment. It also has an undisputed and significant impact on it due to the amounts of materials extracted and produced as waste. The construction industry has emphasized to recycling construction waste (CW), however, relatively less emphasis has been paid on construction waste minimization. CW reduction can be achieved through changes in design concepts, material and construction methods selection and material ma...

  10. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  11. Constructing catalogue of temporal situations

    Directory of Open Access Journals (Sweden)

    Violetta Koseska-Toszewa

    2015-11-01

    Full Text Available Constructing catalogue of temporal situations The paper is aiming to create a common basis for description, comparing, and analysis natural languages. As a subject of comparison we have chosen temporal structures of some languages. For such a choice there exists a perfect tool, describing basic temporal phenomena, namely an ordering of states and events in time, certainty and uncertainty, independency of histories of separate objects, necessity and possibility. This tool is supported by the Petri nets formalism, which seems to be well suited for expressing the above mentioned phenomena. Petri nets are built form three primitive notions: of states, of events that begin or end the states, and so-called flow relation indicating succession of states and events. This simple constituents give rise to many possibilities of representing temporal phenomena; it turns out that such representations are sufficient for many (clearly, not necessarily all temporal situations appearing in natural languages. In description formalisms used till now there is no possibility of expressing such reality phenomena as temporal dependencies in compound statement, or combination of temporality and modality. Moreover, using these formalisms one cannot distinguish between two different sources of uncertainty of the speaker while describing the reality: one, due to the lack of knowledge of the speaker what is going on in outside world, the second, due to objective impossibility of foreseen ways in which some conflict situations will be (or already have been resolved. Petri net formalism seems to be perfectly suited for such differentiations. There are two main description principles that encompassed this paper. First, that assigns meaning to names of grammatical structures in different languages may lead to misunderstanding. Two grammatical structures with apparently close names may describe different reality. Additionally, some grammatical terms used in one language may be

  12. Reactor construction programme in Japan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1959-04-15

    In September last year, the Japanese Government requested the International Atomic Energy Agency to supply three tons of natural uranium for a research reactor, and the Agency has now arranged for its sale to Japan. The metal will be supplied in ingot form and after fabrication it will be used as fuel in a reactor of the natural uranium, heavy water type. The uranium will be obtained from Canada and sold to Japan by IAEA. The Agency had invited tenders for its supply, and after considering the tenders received, the Agency's Board of Governors decided that the Canadian offer to the Agency of three tons of natural uranium free of charge should be accepted and that the selling price to Japan should be US $35. 50 per kilogramme. The price takes into account Article XIV/E of the Agency's Statute which says that the Agency shall establish a scale of charges (including those for storage and handling) for materials furnished to Member States, and that the scale shall be designed to produce revenues to meet expenses in connexion with materials acquired by the Agency and costs of materials and services provided by it under agreements with one or more members. This is the first operation of its kind to be undertaken by the Agency, and the reactor for which the supply is being made will be the first in Japan to be constructed by Japanese scientists and technicians. IAEA's Board of Governors has given the necessary approval to the reactor project for which the Agency is providing assistance

  13. Spatial distributions of niche-constructing populations

    Directory of Open Access Journals (Sweden)

    Xiaozhuo Han

    2015-12-01

    Full Text Available Niche construction theory regards organisms not only as the object of natural selection but also an active subject that can change their own selective pressure through eco-evolutionary feedbacks. Through reviewing the existing works on the theoretical models of niche construction, here we present the progress made on how niche construction influences genetic structure of spatially structured populations and the spatial-temporal dynamics of metapopulations, with special focuses on mathematical models and simulation methods. The majority of results confirmed that niche construction can significantly alter the evolutionary trajectories of structured populations. Organism-environmental interactions induced by niche construction can have profound influence on the dynamics, competition and diversity of metapopulations. It can affect fine-scale spatially distribution of species and spatial heterogeneity of the environment. We further propose a few research directions with potentials, such as applying adaptive dynamics or spatial game theory to explore the effect of niche construction on phenotypic evolution and diversification.

  14. Qinshan CANDU project open top construction method

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Wittann, K.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The significant schedule reductions achieved on the Qinshan CANDU Project were due in large part to the incorporation of advanced construction technologies in project design and delivery. For the Qinshan Project, a number of key advantages were realized through the use of the 'Open Top' construction method. This paper discusses the Qinshan Phase III CANDU Project Open Top implementation method. The Open Top method allowed major equipment to be installed simply, via the use of a Very Heavy Lift (VHL) crane and permitted the use of large-scale modularization. The advantages of Open Top construction, such as simplified access, more flexible project scheduling, improved construction safety and quality, and reduced labours are presented. The large-scale modularization of the Reactor Building Dousing System and the Open Top installation method and advantages relative to traditional CANDU 6 construction practices are also presented. Finally, major improvements for future CANDU plant construction using the Open Top method are discussed. (author)

  15. Organisational Culture in Construction: An Employee Perspective

    Directory of Open Access Journals (Sweden)

    Raufdeen Rameezdeen

    2012-11-01

    Full Text Available A large number of stakeholders in construction projects makes the construction industry prone to disputes. The historical separation between design and construction add to this phenomenon by having a consultant for design and a contractor for construction. Communication breakdown, frequently, is the first sign of problems, notably in the relationship between the Contractor and the Consultant. Therefore, it appears that the split between design and construction has given rise to two separate cultures in the construction industry. This paper attempts to identify whether there is a difference in organisational culture between Consultants and Contractors taken as two groups and determine whether a specific attribute was related to the cultural differences between the two entities. Based on case studies it was found that consultants are biased towards Clan culture while contractors are biased towards Market culture. However, both groups show similar affinity to Adhocracy and Hierarchy cultures.

  16. Construction feasibility of OTEC platforms. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Brewer, J H; Harwood, P; Solberg, K; Fjeld, S

    1978-12-01

    This study provides an evaluation of the feasibility of constructing either steel or concrete OTEC platforms of both spar and ship shape configurations for a range of platform sizes with respect to existing, developed shipyard or fabrication yard facilities that are currently active in marine vessel construction within the US. This brief study is quite broad in scope. Many parameters, including plant size; vessel type, size, configuration, and dimensions; position of heat exchangers; existing construction facility size, geographic location, and potential for modification; and, availability of undeveloped deep water construction sites affect the conclusions drawn. Nevertheless, the conclusions should remain valid and not change significantly, unless there are major changes in either vessel size or US construction capabilities. The various concepts are ranked in order of their feasibility and practicality of construction in existing or modified existing facilities and new facilities.

  17. Construction experience at the Canonsburg UMTRA site

    International Nuclear Information System (INIS)

    Thiers, G.R.; Farnes, L.L.; Wathen, T.R.

    1985-01-01

    Construction of on-site stabilization for over 225,000 cubic yards of abandoned uranium mill tailings in Canonsburg, Pennsylvania, began in October 1983, and is scheduled to be completed in December 1985. This paper describes selected construction experience through October 1984. The following selected events and construction items are discussed in this paper: 1. Construction and operation of a 36,000-square foot, fabric-lined sedimentation basin, including difficulties associated with installation of the liner; 2. Assembly and start-up of the contaminated water treatment plant; 3. Construction of the encapsulation cell test fills, to confirm the performance specification governing the compaction; 4. Excavation, relocation, and placement of contaminated materials, including moisture control and density testing of the radioactive materials; 5. Construction difficulties, including disposition of local leachate from the abandoned industrial complex and an increase in the volume of contaminated material to be encapsulated

  18. COMPETITIVENESS OF THE INDONESIAN CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Agung Budiwibowo

    2009-06-01

    Full Text Available Indonesia’s construction industry is important to the national economy. However, its competitiveness is considered low due to the lack of success of its development strategy and policy. A new approach known as the cluster approach is being used to make strategy and policy in order to develop a stronger more competitive industry . This paper discusses the layout of the Indonesian construction cluster and its competitiveness. The archival analysis research approach was used to identify the construction cluster. The analysis was based on the I/O tables of the years 1995 and 2000, which were published by the Indonesian Central Bureau of Statistics. The results suggest that the Indonesian construction cluster consists of the industries directly involved in construction as the core, with the other related and supporting industries as the balance. The anatomy of the Indonesian construction cluster permits structural changes to happen within it. These changes depend on policies that regulate the cluster’s constituents.

  19. Factors Influencing Tacit Knowledge in Construction

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Increased complexity of the construction business and consequentuse of new management concepts and technologies ledconstruction organisations to focus more on the transfer of explicitknowledge. However, it is the tacit knowledge that determinesthe construction companies’ competitiveness in a business thatis driven by turbulent market conditions and customers’ everincreasingdemands. This paper highlights the importance of tacitknowledge sharing in construction, explores the challenges andopportunities to efficiently share tacit knowledge, and based on theliterature review identifies some critical factors that influence tacitknowledge in construction. It is argued that employees’ knowledgesharing (learning behaviours are influenced by work practices thatare borne by respective organisational behaviours. Organisational,cultural, and project characteristics that facilitate knowledgesharing among construction employees are explored and thepractices that influence the construction employee behaviour insharing tacit knowledge are highlighted.

  20. Effects of radiation rays on construction materials

    International Nuclear Information System (INIS)

    Akkurt, I.; Kilicarslan, S.; Basyigit, C.; Kacar, A.

    2006-01-01

    Molecules that are bring into existence material determined as gas, liquid and stiff according to their internal structures and heat. Materials show various reaction to various effects that is result from all kind of materials have various internal structures. Radiation is covert materials' mechanical, physical and chemical properties. Nowadays in construction formation there isn't using only one material it is preferred that kind of materials composition because of there are run into some problems about choosing and decision sort of material. Material that using in construction is classified as metals, plastics and ceramics in three groups. About sixty percent of construction cost is being formed from construction materials. In this study effects of various radiations on construction materials are being investigated and the end of study it is being suggestion some useful construction materials according to usage land and radiation properties