WorldWideScience

Sample records for director operational test

  1. Operational Test Director Guide. Change 4.

    Science.gov (United States)

    1982-09-20

    necessity for special procedures or "Privacy Act" statements. d. Social Security Numbers are considered " personal information" and should not normaily be...projects with an OTD assigned from within the Headquarters, the OTD and OTC may be the same person , or the OTC may act in a normal section head...time OPTEV- FOR can influence major system charateristics . e. Identify key development risk areas (technical and operational). Insure that the proposed

  2. Management and Use of Director, Operational Test and Evaluation Funds

    National Research Council Canada - National Science Library

    2000-01-01

    .... The reorganization disestablished the functions of the Director, Test, Systems Engineering, and Evaluation, within the Office of Under Secretary of Defense for Acquisition, Technology, and Logistics...

  3. Management and Use of Director, Operational Test and Evaluation Funds

    National Research Council Canada - National Science Library

    2000-01-01

    ... and transferred a wide range of test and evaluation functions and resources, including the oversight of the test ranges and facilities, test investment, and sponsorship of many test related programs...

  4. Director, Operational Test and Evaluation FY 2014 Annual Report

    Science.gov (United States)

    2015-01-01

    fire strategy and test plans. • The Army used gelatin targets to obtain data as inputs for complex computer modeling of M80A1 performance. Testing... gelatin backing. The selected threats for ballistic testing are undergoing cross-sectional profile characterization, including optical microscopy...MHz Upper S-Band Telemetry F-18E/400, E2-D, P-8A, Exdrone, Silver Fox, THAAD, F-16, F-22, B-1, B-2, B-52, C-17, Global Hawk • Issue: AT&T

  5. Director, Operational Test and Evaluation FY 2005 Annual Report

    National Research Council Canada - National Science Library

    2005-01-01

    ...) resources for future testing needs. In support of acquisition, DOT&E published nine Beyond Low-Rate Initial Production Reports, including those for the highly visible and often controversial F-22 Raptor and V-22 Osprey...

  6. A Test Bed for Short Pulse OA Detection of Optical Directors in Amphibious Operations

    National Research Council Canada - National Science Library

    Ertem, M

    1999-01-01

    ...) system to detect optical directors of potential threats in amphibious operations. The use of a short pulse duration allows discrimination of retroreflections from natural sources such as rock formations and vegetation...

  7. IRIS Mission Operations Director's Colloquium

    Science.gov (United States)

    Carvalho, Robert; Mazmanian, Edward A.

    2014-01-01

    Pursuing the Mysteries of the Sun: The Interface Region Imaging Spectrograph (IRIS) Mission. Flight controllers from the IRIS mission will present their individual experiences on IRIS from development through the first year of flight. This will begin with a discussion of the unique nature of IRISs mission and science, and how it fits into NASA's fleet of solar observatories. Next will be a discussion of the critical roles Ames contributed in the mission including spacecraft and flight software development, ground system development, and training for launch. This will be followed by experiences from launch, early operations, ongoing operations, and unusual operations experiences. The presentation will close with IRIS science imagery and questions.

  8. Study and development of an air conditioning system operating on a magnetic heat pump cycle (design and testing of flow directors)

    Science.gov (United States)

    Wang, Pao-Lien

    1992-01-01

    This report describes the fabrication, design of flow director, fluid flow direction analysis and testing of flow director of a magnetic heat pump. The objectives of the project are: (1) to fabricate a demonstration magnetic heat pump prototype with flow directors installed; and (2) analysis and testing of flow director and to make sure working fluid loops flow through correct directions with minor mixing. The prototype was fabricated and tested at the Development Testing Laboratory of Kennedy Space Center. The magnetic heat pump uses rear earth metal plates rotate in and out of a magnetic field in a clear plastic housing with water flowing through the rotor plates to provide temperature lift. Obtaining the proper water flow direction has been a problem. Flow directors were installed as flow barriers between separating point of two parallel loops. Function of flow directors were proven to be excellent both analytically and experimentally.

  9. Operating room nursing directors' influence on anesthesia group operating room productivity.

    Science.gov (United States)

    Masursky, Danielle; Dexter, Franklin; Nussmeier, Nancy A

    2008-12-01

    Implementation of initiatives to increase anesthesia group productivity depends not just on anesthesia groups, but on operating room (OR) nursing administration. OR nursing directors may encourage organizational change based on the needs of their hospitals and nurses. These changes may differ from those that would increase the anesthesia group's productivity. We assessed reward structures using (A) letters of nomination for the "OR Manager of the Year" award offered annually by the publication OR Manager, and (B) data from a salary/career survey of OR directors by the same publication. (A) There were 164 nomination letters submitted from 2004 through 2007 for 45 nominees. The letters contained n = 2659 full sentences and n = 50,821 words. We systematically created a list of 36 terms related to finance, profit, and productivity. We also analyzed the frequency of use of these terms relative to the use of the 15 most common relationship-oriented terms (e.g., compassion, encourage, mentor, and respect). (B) The salary/career survey's questions relevant to anesthesia group productivity had responses from 303 US OR directors, 97% of whom were nurses. We tested the strength of the relationship between the budget responsibility of the OR nursing director and his or her annual salary. (A) 2.6% of sentences in the nomination letters included at least one term related to profit and productivity (95% confidence interval 2.0%-3.2%). Relationship-oriented terms were 9.0 times more prevalent (95% confidence interval 7.1-11.4). (B) There was statistically significant positive proportionality between the OR nursing director's operational budget (including personnel) and his or her salary (Pearson r = 0.64, P time and OR nursing labor costs. Resulting decisions can differ from those that would increase the productivity (profit) of the anesthesia group. Anesthesia groups need to champion initiatives to increase anesthesia productivity, while being sensitive to institutional

  10. NASA Mission Operations Directorate Preparations for the COTS Visiting Vehicles

    Science.gov (United States)

    Shull, Sarah A.; Peek, Kenneth E.

    2011-01-01

    With the retirement of the Space Shuttle looming, a series of new spacecraft is under development to assist in providing for the growing logistical needs of the International Space Station (ISS). Two of these vehicles are being built under a NASA initiative known as the Commercial Orbital Transportation Services (COTS) program. These visiting vehicles ; Space X s Dragon and Orbital Science Corporation s Cygnus , are to be domestically produced in the United States and designed to add to the capabilities of the Russian Progress and Soyuz workhorses, the European Automated Transfer Vehicle (ATV) and the Japanese H-2 Transfer Vehicle (HTV). Most of what is known about the COTS program has focused on the work of Orbital and SpaceX in designing, building, and testing their respective launch and cargo vehicles. However, there is also a team within the Mission Operations Directorate (MOD) at NASA s Johnson Space Center working with their operational counterparts in these companies to provide operational safety oversight and mission assurance via the development of operational scenarios and products needed for these missions. Ensuring that the operational aspect is addressed for the initial demonstration flights of these vehicles is the topic of this paper. Integrating Dragon and Cygnus into the ISS operational environment has posed a unique challenge to NASA and their partner companies. This is due in part to the short time span of the COTS program, as measured from initial contract award until first launch, as well as other factors that will be explored in the text. Operational scenarios and products developed for each COTS vehicle will be discussed based on the following categories: timelines, on-orbit checkout, ground documentation, crew procedures, software updates and training materials. Also addressed is an outline of the commonalities associated with the operations for each vehicle. It is the intent of the authors to provide their audience with a better

  11. Evolution of Training in NASA's Mission Operations Directorate

    Science.gov (United States)

    Hutt, Jason

    2012-01-01

    NASA s Mission Operations Directorate provides all the mission planning, training, and operations support for NASA's human spaceflight missions including the International Space Station (ISS) and its fleet of supporting vehicles. MOD also develops and maintains the facilities necessary to conduct training and operations for those missions including the Mission Control Center, Space Station Training Facility, Space Vehicle Mockup Facility, and Neutral Buoyancy Laboratory. MOD's overarching approach to human spaceflight training is to "train like you fly." This approach means not only trying to replicate the operational environment in training but also to approach training with the same mindset as real operations. When in training, this means using the same approach for executing operations, responding to off-nominal situations, and conducting yourself in the operations environment in the same manner as you would for the real vehicle.

  12. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  13. 7 CFR 2.91 - Director, Office of Operations.

    Science.gov (United States)

    2010-01-01

    ..., excess property pool, resource recovery, shipping and receiving, forms, labor services, issuing of... maintaining the security of physical facilities, self-protection, and warden services, in the Washington, DC..., Office of Operations: (1) Provide services for Department headquarters in the Washington, DC metropolitan...

  14. Program Director Survey: Attitudes Regarding Child Neurology Training and Testing.

    Science.gov (United States)

    Valencia, Ignacio; Feist, Terri B; Gilbert, Donald L

    2016-04-01

    As a result of major clinical and scientific advances and changes in clinical practice, the role of adult neurology training for Child Neurology and Neurodevelopmental Disability (NDD) certification has become controversial. The most recently approved requirements for board eligibility for child neurology and neurodevelopmental disability residents still include 12 months in adult neurology rotations. The objective of this study was to assess United States child neurology and neurodevelopmental disability residency program directors' opinions regarding optimal residency training. The authors developed an 18-item questionnaire and contacted all 80 child neurology and neurodevelopmental disability program directors via e-mail, using SurveyMonkey. A total of 44 program directors responded (55%), representing programs that train 78 categorical and 94 total resident positions, approximately 70% of those filled in the match. Respondents identified multiple areas where child neurology residents need more training, including genetics and neuromuscular disease. A substantial majority (73%) believed child neurology and neurodevelopmental disability residents need less than 12 adult neurology training months; however, most (75%) also believed adult hospital service and man-power needs (55%) and finances (34%) would pose barriers to reducing adult neurology. Most (70%) believed reductions in adult neurology training should be program flexible. A majority believed the written initial certification examination should be modified with more child neurology and fewer basic neuroscience questions. Nearly all (91%) felt the views of child neurology and neurodevelopmental disability program directors are under-represented within the Accreditation Council for Graduate Medical Education Residency Review Committee. The requirement for 12 adult neurology months for Child Neurology and Neurodevelopmental Disability certification is not consistent with the views of the majority of program

  15. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public...November 2017 2. REPORT TYPE Technical Note 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Standard Operating Procedure for Accelerated

  16. The director task: A test of Theory-of-Mind use or selective attention?

    Science.gov (United States)

    Rubio-Fernández, Paula

    2017-08-01

    Over two decades, the director task has increasingly been employed as a test of the use of Theory of Mind in communication, first in psycholinguistics and more recently in social cognition research. A new version of this task was designed to test two independent hypotheses. First, optimal performance in the director task, as established by the standard metrics of interference, is possible by using selective attention alone, and not necessarily Theory of Mind. Second, pragmatic measures of Theory-of-Mind use can reveal that people actively represent the director's mental states, contrary to recent claims that they only use domain-general cognitive processes to perform this task. The results of this study support both hypotheses and provide a new interactive paradigm to reliably test Theory-of-Mind use in referential communication.

  17. SPECTR System Operational Test Report

    International Nuclear Information System (INIS)

    Landman, W.H. Jr.

    2011-01-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  18. Director, Operational Test and Evaluation FY 2006 Annual Report

    Science.gov (United States)

    2006-12-01

    that no other Servces be authorized to field Block 1 without successful IOT&E or specal authorzaton to meet wart me necesstes. The Marne...built in Germany and shipped to Columbus for final assembly. The Mississippi plant will undergo a major expansion to accommodate the LUH program...The plant wll begn wth partal assembly, followed by full assembly, and finally the subsequent U.S. manufacture of major subsystems. The Army

  19. Director, Operational Test and Evaluation FY 2015 Annual Report

    Science.gov (United States)

    2016-01-01

    results indicates that: - The F135 IFR -confi gured engine is tolerant of fuel ingestion caused by single missile-warhead fragment impacts in the...that grew larger to support OEF and OIF, the impact to DOT&E staffing is especially significant. To preserve its Title 10 responsibilities, it is...address frontal impact -induced injuries) are not appropriate to assess the effects of the vertical forces and accelerations imparted from a combat

  20. 30 CFR 282.10 - Jurisdiction and responsibilities of Director.

    Science.gov (United States)

    2010-07-01

    ... part and are under the jurisdiction of the Director: Exploration, testing, and mining operations... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Jurisdiction and responsibilities of Director... Jurisdiction and Responsibilities of Director § 282.10 Jurisdiction and responsibilities of Director. Subject...

  1. SSC Test Operations Contract Overview

    Science.gov (United States)

    Kleim, Kerry D.

    2010-01-01

    This slide presentation reviews the Test Operations Contract at the Stennis Space Center (SSC). There are views of the test stands layouts, and closer views of the test stands. There are descriptions of the test stand capabilities, some of the other test complexes, the Cryogenic propellant storage facility, the High Pressure Industrial Water (HPIW) facility, and Fluid Component Processing Facility (FCPF).

  2. Sludge stabilization operability test report

    International Nuclear Information System (INIS)

    Lewis, W.S.

    1994-01-01

    Document provides the results of the Operability Test Procedure performed to test the operability of the HC-21C thermal stabilization process for sludge. The OTP assured all equipment functioned properly and established the baseline temperature profile for glovebox HC-21C

  3. Athletic Departments' Operating Expenses as a Predictor of Their Directors' Cup Standing

    Science.gov (United States)

    Magner, Amber

    2014-01-01

    The NACDA Directors' Cup is a competition utilizing an unbiased scoring system that encourages a broad based athletic department as the standard for defining intercollegiate athletic success. Therefore, for NCAA DI athletic administrators the Directors' Cup should be the standard for defining intercollegiate athletic success. The purpose of this…

  4. Technical co-operation report for 2002. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    General Conference resolution GC(46)/RES/10 reiterated the need to strengthen the technical co- operation programme and requested the Director General to report to the Board of Governors periodically and to the General Conference at its forty-seventh (2003) session on the implementation of resolution GC(46)/RES/10. Part A of this report responds to the General Conference resolution by providing an overview of the progress achieved in technical co-operation policies, strategies, working relations, and internal management during the period 1 April 2002 to 31 March 2003, as well as the major new challenges facing the technical co-operation programme. Part B reports on operational activities and programme performance at the country and regional levels during the calendar year 2002, and Part C reviews the use of financial and human resources in the programme at an aggregate level. As part of its efforts to refine policies for improving programme development, the Agency reviewed the Technical Co-operation Strategy in 2002. The resulting document, The Technical Co-operation Strategy: the 2002 Review (document GOV/INF/2002/8/Mod.1), states that the strategic goal originally identified in the Strategy in 1997 remains valid, and defines four objectives to guide the technical co-operation programme: applying the central criterion (strong government commitment), developing strategic partnerships, increasing the level of funding for technical co-operation, and promoting greater sustainability and self-reliance of nuclear institutions. In line with the Technical Co-operation Strategy, one of the key features of the Agency.s work in 2002 was continuing consultations with Member States at both the policy and operational levels on the management of the ongoing technical co-operation programme and on planning for future activities. The dialogue with Member States aimed at clarifying the strategic objectives and key tools for the utilization of resources to achieve maximum

  5. Technical co-operation report for 2002. Report by the Director General

    International Nuclear Information System (INIS)

    2003-08-01

    General Conference resolution GC(46)/RES/10 reiterated the need to strengthen the technical co- operation programme and requested the Director General to report to the Board of Governors periodically and to the General Conference at its forty-seventh (2003) session on the implementation of resolution GC(46)/RES/10. Part A of this report responds to the General Conference resolution by providing an overview of the progress achieved in technical co-operation policies, strategies, working relations, and internal management during the period 1 April 2002 to 31 March 2003, as well as the major new challenges facing the technical co-operation programme. Part B reports on operational activities and programme performance at the country and regional levels during the calendar year 2002, and Part C reviews the use of financial and human resources in the programme at an aggregate level. As part of its efforts to refine policies for improving programme development, the Agency reviewed the Technical Co-operation Strategy in 2002. The resulting document, The Technical Co-operation Strategy: the 2002 Review (document GOV/INF/2002/8/Mod.1), states that the strategic goal originally identified in the Strategy in 1997 remains valid, and defines four objectives to guide the technical co-operation programme: applying the central criterion (strong government commitment), developing strategic partnerships, increasing the level of funding for technical co-operation, and promoting greater sustainability and self-reliance of nuclear institutions. In line with the Technical Co-operation Strategy, one of the key features of the Agency.s work in 2002 was continuing consultations with Member States at both the policy and operational levels on the management of the ongoing technical co-operation programme and on planning for future activities. The dialogue with Member States aimed at clarifying the strategic objectives and key tools for the utilization of resources to achieve maximum

  6. Technical co-operation report for 2001. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    the General Conference in resolution GC(45)/RES/11, the Secretariat has worked with Member States during the past year to update the Technical Cooperation Strategy, endorsed by the Board in 1997. Through implementation of the Strategy, the Agency has been successful in raising the quality of technical co-operation projects and increasing the impact of the programme on the development goals of its Member States. The Third Standing Advisory Group on Technical Assistance and Cooperation (SAGTAC III), which met in August 2001 and March 2002, examined the Strategy and advised the Director General on future objectives and the performance indicators with which to measure progress towards these objectives.

  7. Technical co-operation report for 2001. Report by the Director General

    International Nuclear Information System (INIS)

    2001-01-01

    the General Conference in resolution GC(45)/RES/11, the Secretariat has worked with Member States during the past year to update the Technical Cooperation Strategy, endorsed by the Board in 1997. Through implementation of the Strategy, the Agency has been successful in raising the quality of technical co-operation projects and increasing the impact of the programme on the development goals of its Member States. The Third Standing Advisory Group on Technical Assistance and Cooperation (SAGTAC III), which met in August 2001 and March 2002, examined the Strategy and advised the Director General on future objectives and the performance indicators with which to measure progress towards these objectives

  8. Reactor operator screening test experiences

    International Nuclear Information System (INIS)

    O'Brien, W.J.; Penkala, J.L.; Witzig, W.F.

    1976-01-01

    When it became apparent to Duquesne Light Company of Pittsburgh, Pennsylvania, that the throughput of their candidate selection-Phase I training-reactor operator certification sequence was something short of acceptable, the utility decided to ask consultants to make recommendations with respect to candidate selection procedures. The recommendation implemented was to create a Nuclear Training Test that would predict the success of a candidate in completing Phase I training and subsequently qualify for reactor operator certification. The mechanics involved in developing and calibrating the Nuclear Training Test are described. An arbitration decision that resulted when a number of International Brotherhood of Electrical Workers union employees filed a grievance alleging that the selection examination was unfair, invalid, not job related, inappropriate, and discriminatorily evaluated is also discussed. The arbitration decision favored the use of the Nuclear Training Test

  9. 27 February 2012 - Director of the Health Directorate at the Research DG European Commission R. Draghia-Akli in the ATLAS visitor centre with ATLAS Former Collaboration Spokesperson P. Jenni and Head of CERN EU Projects Office S. Stavrev; in the LHC superconducting magnet test hall with E. Todesco; and signing the guest book with CERN Director-General R. Heuer.

    CERN Multimedia

    Michel Blanc

    2012-01-01

    27 February 2012 - Director of the Health Directorate at the Research DG European Commission R. Draghia-Akli in the ATLAS visitor centre with ATLAS Former Collaboration Spokesperson P. Jenni and Head of CERN EU Projects Office S. Stavrev; in the LHC superconducting magnet test hall with E. Todesco; and signing the guest book with CERN Director-General R. Heuer.

  10. Associated Roles of Perioperative Medical Directors and Anesthesia: Hospital Agreements for Operating Room Management.

    Science.gov (United States)

    Dexter, Franklin; Epstein, Richard H

    2015-12-01

    As reviewed previously, decision making can be made systematically shortly before the day of surgery based on reducing the hours of overutilized operating room (OR) time and tardiness of case starts (i.e., patient waiting). We subsequently considered in 2008 that such decision making depends on rational anesthesia-hospital agreements specifying anesthesia staffing. Since that prior study, there has been a substantial increase in understanding of the timing of decision making to reduce overutilized OR time. Most decisions substantively influencing overutilized OR time are those made within 1 workday before the day of surgery and on the day of surgery, because only then are ORs sufficiently full that case scheduling and staff assignment decisions affect overutilized OR time. Consequently, anesthesiologists can easily be engaged in such decisions, because generally they must be involved to ensure that the corresponding anesthesia staff assignments are appropriate. Despite this, at hospitals with >8 hours of OR time used daily in each OR, computerized recommendations are superior to intuition because of cognitive biases. Decisions need to be made by a Perioperative Medical Director who has knowledge of the principles of perioperative managerial decision making published in the scientific literature rather than by a committee lacking this competency. Education in the scientific literature, and when different analytical methods should be used, is important. The addition that we make in this article is to show that an agreement between an anesthesia group and a hospital can both reduce overutilized OR time and patient waiting: The anesthesia group and hospital will ensure, hourly, that, when there are case(s) waiting to start, the number of ORs in use for each service will be at least the number that maximizes the efficiency of use of OR time. Neither the anesthesia group nor the hospital will be expected to run more than that number of ORs without mutual agreement

  11. Periodic testing in operative action

    International Nuclear Information System (INIS)

    Larm, T.

    2005-01-01

    Periodic testing forms a remarkable part of the regular work tasks of the shift crew. Testing is generally carried out beside the daily monitoring and control work. Even remarkable plant related differences may occur in the procedures and routines used in periodic testing. The goal is still always the same, to regularly ensure that the systems and equipment are in working order according to their design. This presentation studies with examples the execution and scope of periodic testing as well as the routines and procedures used in the testing in Loviisa power plant. The presentation is based on the testing procedures of Loviisa power plant and the aim is not to compare them to the procedures of other plants. The scope of periodic testing has increased and the routines and procedures have been developed as the operation experience has increased. The assessment of the need of periodic testing and the consideration of the practical execution possibilities should be a part of the plant's planning phase as a part of the planning process. (orig.)

  12. Navigation and flight director guidance for the NASA/FAA helicopter MLS curved approach flight test program

    Science.gov (United States)

    Phatak, A. V.; Lee, M. G.

    1985-01-01

    The navigation and flight director guidance systems implemented in the NASA/FAA helicopter microwave landing system (MLS) curved approach flight test program is described. Flight test were conducted at the U.S. Navy's Crows Landing facility, using the NASA Ames UH-lH helicopter equipped with the V/STOLAND avionics system. The purpose of these tests was to investigate the feasibility of flying complex, curved and descending approaches to a landing using MLS flight director guidance. A description of the navigation aids used, the avionics system, cockpit instrumentation and on-board navigation equipment used for the flight test is provided. Three generic reference flight paths were developed and flown during the test. They were as follows: U-Turn, S-turn and Straight-In flight profiles. These profiles and their geometries are described in detail. A 3-cue flight director was implemented on the helicopter. A description of the formulation and implementation of the flight director laws is also presented. Performance data and analysis is presented for one pilot conducting the flight director approaches.

  13. Regional Test Center Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Stein, Joshua [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burnham, Laurie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Christian Birk [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    The U.S. DOE Regional Test Center for Solar Technologies program was established to validate photovoltaic (PV) technologies installed in a range of different climates. The program is funded by the Energy Department's SunShot Initiative. The initiative seeks to make solar energy cost competitive with other forms of electricity by the end of the decade. Sandia National Laboratory currently manages four different sites across the country. The National Renewable Energy Laboratory manages a fifth site in Colorado. The entire PV portfolio currently includes 20 industry partners and almost 500 kW of installed systems. The program follows a defined process that outlines tasks, milestones, agreements, and deliverables. The process is broken out into four main parts: 1) planning and design, 2) installation, 3) operations, and 4) decommissioning. This operations manual defines the various elements of each part.

  14. Pilot dynamics for instrument approach tasks: Full panel multiloop and flight director operations

    Science.gov (United States)

    Weir, D. H.; Mcruer, D. T.

    1972-01-01

    Measurements and interpretations of single and mutiloop pilot response properties during simulated instrument approach are presented. Pilot subjects flew Category 2-like ILS approaches in a fixed base DC-8 simulaton. A conventional instrument panel and controls were used, with simulated vertical gust and glide slope beam bend forcing functions. Reduced and interpreted pilot describing functions and remmant are given for pitch attitude, flight director, and multiloop (longitudinal) control tasks. The response data are correlated with simultaneously recorded eye scanning statistics, previously reported in NASA CR-1535. The resulting combined response and scanning data and their interpretations provide a basis for validating and extending the theory of manual control displays.

  15. Test Platform for Advanced Digital Control of Brushless DC Motors (MSFC Center Director's Discretionary Fund)

    Science.gov (United States)

    Gwaltney, D. A.

    2002-01-01

    A FY 2001 Center Director's Discretionary Fund task to develop a test platform for the development, implementation. and evaluation of adaptive and other advanced control techniques for brushless DC (BLDC) motor-driven mechanisms is described. Important applications for BLDC motor-driven mechanisms are the translation of specimens in microgravity experiments and electromechanical actuation of nozzle and fuel valves in propulsion systems. Motor-driven aerocontrol surfaces are also being utilized in developmental X vehicles. The experimental test platform employs a linear translation stage that is mounted vertically and driven by a BLDC motor. Control approaches are implemented on a digital signal processor-based controller for real-time, closed-loop control of the stage carriage position. The goal of the effort is to explore the application of advanced control approaches that can enhance the performance of a motor-driven actuator over the performance obtained using linear control approaches with fixed gains. Adaptive controllers utilizing an exact model knowledge controller and a self-tuning controller are implemented and the control system performance is illustrated through the presentation of experimental results.

  16. 14 CFR 33.89 - Operation test.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation test. 33.89 Section 33.89... STANDARDS: AIRCRAFT ENGINES Block Tests; Turbine Aircraft Engines § 33.89 Operation test. (a) The operation test must include testing found necessary by the Administrator to demonstrate— (1) Starting, idling...

  17. 14 CFR 33.51 - Operation test.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation test. 33.51 Section 33.51... STANDARDS: AIRCRAFT ENGINES Block Tests; Reciprocating Aircraft Engines § 33.51 Operation test. The operation test must include the testing found necessary by the Administrator to demonstrate backfire...

  18. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  19. Temperature buffer test. Dismantling operation

    Energy Technology Data Exchange (ETDEWEB)

    Aakesson, Mattias [Clay Technology AB, Lund (Sweden)

    2010-12-15

    The Temperature Buffer Test (TBT) is a joint project between SKB/ANDRA and supported by ENRESA (modelling) and DBE (instrumentation), which aims at improving the understanding and to model the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test has been carried out in a KBS-3 deposition hole at Aespoe HRL. It was installed during the spring of 2003. Two heaters (3 m long, 0.6 m diameter) and two buffer arrangements have been investigated: the lower heater was surrounded by bentonite in the usual way, whereas the upper heater was surrounded by a ring of sand. The test was dismantled and sampled during a period from the end of October 2009 to the end of April 2010, and this report describes this operation. Different types of samples have been obtained during this operation. A large number of diameter 50 mm bentonite cores have been taken for analysis of water content and density. Large pieces, so-called big sectors, have been taken for hydro-mechanical and chemical characterizations. Finally, there has been an interest to obtain different types of interface samples in which bentonite were in contact with sand, iron or concrete. One goal has been to investigate the retrievability of the upper heater, given the possibility to remove the surrounding sand shield, and a retrieval test has therefore been performed. The sand in the shield was first removed with an industrial vacuum cleaner after loosening the material through mechanical means (with hammer drill and core machine). A front loader was subsequently used for applying a sufficient lifting force to release the heater from the bentonite underneath. The experiment has been documented in different aspects: measurements of the coordinate (height or radius) of different interfaces (between bentonite blocks and between bentonite and sand); verification of sensor positions and retrieval of sensors for subsequent

  20. Temperature buffer test. Dismantling operation

    International Nuclear Information System (INIS)

    Aakesson, Mattias

    2010-12-01

    The Temperature Buffer Test (TBT) is a joint project between SKB/ANDRA and supported by ENRESA (modelling) and DBE (instrumentation), which aims at improving the understanding and to model the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test has been carried out in a KBS-3 deposition hole at Aespoe HRL. It was installed during the spring of 2003. Two heaters (3 m long, 0.6 m diameter) and two buffer arrangements have been investigated: the lower heater was surrounded by bentonite in the usual way, whereas the upper heater was surrounded by a ring of sand. The test was dismantled and sampled during a period from the end of October 2009 to the end of April 2010, and this report describes this operation. Different types of samples have been obtained during this operation. A large number of diameter 50 mm bentonite cores have been taken for analysis of water content and density. Large pieces, so-called big sectors, have been taken for hydro-mechanical and chemical characterizations. Finally, there has been an interest to obtain different types of interface samples in which bentonite were in contact with sand, iron or concrete. One goal has been to investigate the retrievability of the upper heater, given the possibility to remove the surrounding sand shield, and a retrieval test has therefore been performed. The sand in the shield was first removed with an industrial vacuum cleaner after loosening the material through mechanical means (with hammer drill and core machine). A front loader was subsequently used for applying a sufficient lifting force to release the heater from the bentonite underneath. The experiment has been documented in different aspects: measurements of the coordinate (height or radius) of different interfaces (between bentonite blocks and between bentonite and sand); verification of sensor positions and retrieval of sensors for subsequent

  1. 78 FR 61400 - Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station, Issuance of Director's Decision

    Science.gov (United States)

    2013-10-03

    ... 40 years since their initial construction. The wires, and possibly the connections and splices inside conduits, are designed to operate properly only in a dry environment and are not designed to operate in a... construction. There are no existing methods to ensure operability, short of visual inspection or replacing...

  2. The Agency's technical co-operation activities in 1985. Report by the Director General

    International Nuclear Information System (INIS)

    1986-08-01

    Although total resources and disbursements were higher in 1985 than in previous years, the growth rates for both declined somewhat. New resources for the Technical Assistance and Co-operation Fund (TACF) increased by 13%, the TACF accounting for over 66% of all technical co-operation resources in 1985. Pledges made towards the 1985 target for voluntary contributions to the TACF came close to 90% of the target. Although a significant loss on exchange had to be absorbed by the Fund, 96.9% of the target was covered thanks to additional income. Although extrabudgetary resources declined in 1985, they still accounted for one fifth of all technical assistance resources. There was a significant increase in in-kind contributions; this was attributable to the support for non-destructive testing training in Latin America given by Canada, which was the second largest donor of in-kind assistance after the United States. UNDP resources rose very slightly. With UNDP's new five-year programming cycle beginning in 1987, there may be further increases if new projects are identified and timely action taken. New information on implementation expressed as net expenditure and net expenditure rates has been introduced in the form of Expenditure Summaries I, II and III, which provide a more precise picture of performance by fund, geographic area, programme component, field of activity and technical Division. Net expenditure against all funds stood at 57.9%. Net expenditure against the TACF was 66.3%. As UNDP resources and funds in trust account for relatively small shares of the programme, their utilization does not influence the overall net expenditure rate significantly. However, the slow utilization of extrabudgetary resources did have an adverse effect on programme performance as a whole. Net expenditures from the TACF continued to increase at a higher rate than resources, so that the unobligated balance declined for the second consecutive year. In the past, the growing unobligated

  3. The Development of the J9: An Operational Level Directorate for Stability and Security Operations for the Military

    National Research Council Canada - National Science Library

    Sheffe, Richard C

    2007-01-01

    .... Many historical case studies suggest that this is a result of not having an ever-present, multi-disciplined staff at the operational level devoted to monitoring and planning for potential SSTR operations...

  4. Rail Impact Testing. Test Operations Procedure (TOP)

    Science.gov (United States)

    2008-09-15

    impact test. The rail impact test is used to verify structural integrity of the test item and the adequacy of the tie-down system and tie-down...strength of provisions, connection and supporting structural frame, paragraph 5.2.3 ** Superscript...parts, to include outriggers and booms) without advanced approval by SDDCTEA. Torque nuts on wire rope clips to their correct value. Torque cable

  5. Software testing concepts and operations

    CERN Document Server

    Mili, Ali

    2015-01-01

    Explores and identifies the main issues, concepts, principles and evolution of software testing, including software quality engineering and testing concepts, test data generation, test deployment analysis, and software test managementThis book examines the principles, concepts, and processes that are fundamental to the software testing function. This book is divided into five broad parts. Part I introduces software testing in the broader context of software engineering and explores the qualities that testing aims to achieve or ascertain, as well as the lifecycle of software testing. Part II c

  6. Technical co-operation report for 2000. Report by the Director General

    International Nuclear Information System (INIS)

    2001-01-01

    This report covers three separate topics. Part one fulfills the Agency's obligation under the General Conference resolution GC(44)/RES/18 to report on the Strengthening of Technical Co-operation. It covers the period from 1 April 2000 to 31 March 2001. The report examines the finalization of the 2001-2002 technical co-operation programme and several key concepts of the Technical Co-operation Strategy such as Partners in Development, Technical Co-operation among Developing Countries, and the continuing evolution of Regional Resource Centres. Reflecting an important trend in the technical co-operation programme, which was mandated by the General Conference, the report describes the results achieved in several programmes in least developed countries. Part two reports on the major achievements of the technical co-operation programme in 2000 in the different regions of the world. Part three presents a summary of the financial and non-financial parameters of the technical co-operation programme. The supplement to the report provides a more detailed review of resources and contributions, disbursements and non-financial indicators

  7. Technical co-operation report for 2000. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report covers three separate topics. Part one fulfills the Agency's obligation under the General Conference resolution GC(44)/RES/18 to report on the Strengthening of Technical Co-operation. It covers the period from 1 April 2000 to 31 March 2001. The report examines the finalization of the 2001-2002 technical co-operation programme and several key concepts of the Technical Co-operation Strategy such as Partners in Development, Technical Co-operation among Developing Countries, and the continuing evolution of Regional Resource Centres. Reflecting an important trend in the technical co-operation programme, which was mandated by the General Conference, the report describes the results achieved in several programmes in least developed countries. Part two reports on the major achievements of the technical co-operation programme in 2000 in the different regions of the world. Part three presents a summary of the financial and non-financial parameters of the technical co-operation programme. The supplement to the report provides a more detailed review of resources and contributions, disbursements and non-financial indicators.

  8. M109 Family of Vehicles, Paladin Integrated Management (PIM): Operational Assessment of the Initial Operational Test and Evaluation (IOT and E)

    Science.gov (United States)

    2017-01-01

    Director, Operational Test and Evaluation M109 Family of Vehicles, Paladin Integrated Management (PIM) Operational Assessment of the... operational suitability, test adequacy, and survivability of the M109 Family of Vehicles (FoV), known as Paladin Integrated Management (PIM) Self...prevent the M109A7 SPH-equipped unit from completing its mission. The Paladin Integrated Management (PIM) Initial Operational Test and Evaluation

  9. Technical co-operation report for 1997. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    This report covers the IAEA Technical Co-operation (TC) activities during 1997, gives examples of the most significant accomplishments during the year and sets out the status of resources and delivery of the TC programme. The document outlines the steps taken to strengthen planning, design, monitoring and evaluation of TC projects. It also describes how the programme's operational base is being broadened to form new partnerships, using Country Programme Frameworks and Thematic Planning to meet the Member States' priority needs and expand project impact.

  10. Technical co-operation report for 1997. Report by the Director General

    International Nuclear Information System (INIS)

    1998-08-01

    This report covers the IAEA Technical Co-operation (TC) activities during 1997, gives examples of the most significant accomplishments during the year and sets out the status of resources and delivery of the TC programme. The document outlines the steps taken to strengthen planning, design, monitoring and evaluation of TC projects. It also describes how the programme's operational base is being broadened to form new partnerships, using Country Programme Frameworks and Thematic Planning to meet the Member States' priority needs and expand project impact

  11. The Agency's Technical Co-operation activities in 1984. Report by the Director General

    International Nuclear Information System (INIS)

    1985-08-01

    The year 1984 can be described as one during which efforts were made to increase momentum in the development co-operation between the Agency and its Member States while continuing to improve the quality of the technical assistance rendered. For the first time, the adjusted programme exceeded $50 million. During the year, changes were introduced in the administration of the programme in line with recommendations endorsed by the Board in 1983 at the end of its first technical co-operation policy review. In 1984, when the new technical co-operation policies were applied, there were three principal aims. First, the flow of Technical Assistance and Co-operation Fund resources was to be improved; by decreasing accumulated unobligated balances, an optimum level of resource utilization was to be attained by 1986. Second, procedures for the procurement of goods and services were to be streamlined in order to permit substantial increases in programme delivery. Third, systematic project evaluation was to lead to a number of specific actions that would increase the effectiveness of the Agency's development assistance. With regard to the first aim, implementation increased by 44% over the 1983 level, passing the $30 million mark in October and reaching $36.6 million by the end of the year. Of this amount, $31.8 million related to the implementation of activities programmed for 1984. Therefore, an increase in total resources of only 4% was accompanied by an increase in current-year implementation of 34%. As a result, the upward trend in the unobligated balance was checked, and earmarkings against the TACF actually decreased. The implementation rate against the TACF rose from 58% in 1983 to 65% in 1984, reaching the level that had been set as a target. If this performance can be maintained in 1985, it will be possible to reach the optimum level of TACF resource utilization one year earlier than originally expected. As regards the second aim, streamlined procedures introduced in

  12. WRAP TRUPACT loading systems operational test report

    International Nuclear Information System (INIS)

    DOSRAMOS, E.V.

    1999-01-01

    This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion

  13. 10 CFR 1.32 - Office of the Executive Director for Operations.

    Science.gov (United States)

    2010-01-01

    ... supervision and direction of the Chairman as provided in Reorganization Plan No. 1 of 1980. (b) The EDO supervises and coordinates policy development and operational activities in the following offices: The Office... Office of Information Services, the Office of Investigations, the Office of Small Business and Civil...

  14. The Agency's Technical Co-operation activities in 1987. Report by the Director General

    International Nuclear Information System (INIS)

    1988-08-01

    This report is part of a wide range of documentation which the Agency provides to Member States on its technical co-operation activities at various times during the year. It is, in particular, complemented by the achievement reporting submitted to the Technical Assistance and Co-operation Committee of the Board in the annual implementation reports that give the status of the technical co-operation programmes as at 30 September in each year. Following the 1986 Technical Co-operation Seminar and based on continuing consultations with Member States various steps to improve the quality of the programme were taken in 1987: for example, new project request forms and management plans were introduced and preparatory assistance was expanded. Office automation was intensified and the computerized data base covering technical co-operation was enhanced further. Work continues on the adaptation of data provided by the new Financial Information and Control System (FIGS) to the needs of the technical co-operation programmes and vice-versa. While several problems have still to be overcome, it has on the whole, been possible in this report to re-establish data comparability with previous years. Evaluation has become an integral part of the Agency's technical cooperation activities. In addition to on-going mid-project and end-of-project evaluations, expert services and fellowships were evaluated in 1987 and the first country programme evaluation was also undertaken. During 1987, a total of 962 projects were operational and 64 training courses were held. These activities involved 1808 expert assignments while 1975 persons received training abroad. Of the provisions in the 1987 total adjusted programme, one half was earmarked for equipment, while the other half was equally divided between ear markings for experts and for training. Of the Agency's technical co-operation resources in 1987, 72.5% came from the Technical Assistance and Co-operation Fund, 13.7% from extra budgetary

  15. Vacuum-to-air interface for the advanced test accelerator beam director

    International Nuclear Information System (INIS)

    Cruz, G.E.; Edwards, W.F.; Kavanagh, D.P.; Addis, R.B.; Weiss, W.C.; Livenspargar, C.M.

    1986-01-01

    A vacuum-to-air transition was created to facilitate the Lawrence Livermore National Laboratory's Advanced Test Accelerator (ATA) electron beam 1-Hz pulse rate. It is necessary that a pulsed particle beam go from a region at 10 -6 torr through a 1-cm-diam maximum aperture into a region at 760 torr. This must be accomplished without the use of windows or solid barriers. Two tests will be conducted on the vacuum-to-air interface. The first determines pressure profiles through 1.0-mm- and 10.0-mm-diam orifices. The second test employs an expendable foil and foil advancement mechanism. In this paper, the experimental results of the orifice test are presented and the analytical results are compared with the empirical results. The foil advancement test will be documented after the test is completed. The mechanism serves both as an orifice and as a fast-acting vacuum valve. In operation, the electron beam penetrates the thin foil, thereby creating an aperture of minimum geometry. During the balance of the pulse cycle, after the beam duration, the foil is advanced to seal the opening and recover the almost negligible loss in vacuum

  16. Technical co-operation report for 1999. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-08-01

    This report presents the IAEA Technical Co-operation (TC) activities in 1999 and covers three separate topics. Part I reports on the Strengthening of TC and looks at the elements of the TC Strategy and how they contributed to the TC Programme. Part II reports on the major achievements of the TC Programme in 1999 in different regions of the world. In addition to reviewing some of the results of national and regional activities in each region - including activities under Regional Co-operation Agreements - this section looks at three interregional projects, and provides highlights of selected projects that were closed in 1999. Part III presents a technical discussion of the financial parameters of the TC Programme. A more detailed review of resources and contributions, disbursements, and non-financial indicators is provided in a Supplement to this report.

  17. Technical co-operation report for 1999. Report by the Director General

    International Nuclear Information System (INIS)

    2000-08-01

    This report presents the IAEA Technical Co-operation (TC) activities in 1999 and covers three separate topics. Part I reports on the Strengthening of TC and looks at the elements of the TC Strategy and how they contributed to the TC Programme. Part II reports on the major achievements of the TC Programme in 1999 in different regions of the world. In addition to reviewing some of the results of national and regional activities in each region - including activities under Regional Co-operation Agreements - this section looks at three interregional projects, and provides highlights of selected projects that were closed in 1999. Part III presents a technical discussion of the financial parameters of the TC Programme. A more detailed review of resources and contributions, disbursements, and non-financial indicators is provided in a Supplement to this report

  18. W-087 Operational test report. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks. The equipment to be tested includes the following: a. Leak detection system operation and controls. b. Electrical interlocks.- C. Transfer pump oper ation. d. Vacuum breaker system interlocks.

  19. The Agency's Technical Co-operation activities in 1986. Report by the Director General

    International Nuclear Information System (INIS)

    1987-08-01

    During 1986, a total of 854 projects were operational and 71 training courses were held. These activities involved 1930 expert assignments. In addition, 937 persons received training under the fellowship programme. Performance indicators (non-financial) are given in Part II of this report (Sections B and C) in order to provide some impression of the increase in implementation actions related to the delivery of a growing programme. Although total resources were higher in 1986 than in previous years, the overall growth rate declined further while new obligations and disbursements increased steeply. The near-stagnation in the net expenditure rate for Technical Assistance and Co-operation Fund (TACF) resources which occurred in 1985 prompted close monitoring and follow-up measures in 1986. These actions led to an all-time high TACF net expenditure rate, namely 75.7%, in 1986. As the TACF represented 71% of all technical co-operation resources, overall programme performance in terms of net expenditure reached 67.6%, which is also the highest rate ever recorded. TACF resources increased by 11%. Pledges and miscellaneous income covered 92.7% of the target. The percentage attainment of the target has been declining since 1983. As actual disbursements against the TACF increased at a much higher rate than new resources, the unobligated balance decreased to the extent that striving for even higher net expenditure rates would no longer be consistent with judicious resource management. The share of extrabudgetary funds in the programme declined: they accounted for 14.5% of the resources and 12.6% of the disbursements in 1986. The Federal Republic of Germany became the largest contributor of extrabudgetary funds. Special attention will be given to the utilization of these resources so that delivery rates can be improved. As anticipated, UNDP's share in resources and disbursements increased and several new large-scale projects were approved. In-kind assistance continued to play a

  20. Technical co-operation report for 1998. Report by the Director General

    International Nuclear Information System (INIS)

    1999-01-01

    This report presents the IAEA Technical Co-operation (TC) activities during 1998 and highlights most significant accomplishments. Part I of this report reviews the strengthening of TC, both in financial aspects and through implementation of the TC strategy. Part II reviews extensively the actual output of the TC programme; it looks at each geographic region, and reports on the results of national, regional and, where applicable, interregional activities in those regions. Part III presents a technical discussion of the financial parameters of the TC programme and ends with financial implementation summaries

  1. Technical co-operation report for 1998. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This report presents the IAEA Technical Co-operation (TC) activities during 1998 and highlights most significant accomplishments. Part I of this report reviews the strengthening of TC, both in financial aspects and through implementation of the TC strategy. Part II reviews extensively the actual output of the TC programme; it looks at each geographic region, and reports on the results of national, regional and, where applicable, interregional activities in those regions. Part III presents a technical discussion of the financial parameters of the TC programme and ends with financial implementation summaries.

  2. Technical Co-operation Report for 1996. Report by the Director General

    International Nuclear Information System (INIS)

    1997-01-01

    The Agency's Technical Cooperation (TC) Programme made further progress during 1996 in implementing recent initiatives to strengthen efficiency and effectiveness. These initiatives seek to maximize the developmental contribution of counterpart institutions by emphasizing the management of technology to solve social and economic problems. The new direction has been embodied in the term ''Partners in Development''. The Partners in Development approach is reflected in last year's Report to the Board of Governors and the General Conference on Strengthening of the Agency's Technical Co-operation Activities, which provided an update on ongoing activities and elaborated new initiatives. The 1995 Technical Cooperation Report focused on the progress in implementing these initiatives. Next year, the Secretariat plans to combine the TC Report with the Report on Strengthening of the Agency's Technical Co-operation Activities in order to improve the clarity, consistency and economy of these presentations. Establishing a development partnership with Member States is the central goal of a new Strategy for TC. The refinement of this strategy required considerable effort during 1996, when the process first began to define objectives, targets and the means of accomplishing them. Alongside internal consultations, the role of SAGTAC became instrumental in reaching consensus on the main elements of the strategy. Future efforts include the formulation of implementation plans for the strategy. Once completed, the strategy will be presented to the TACC and Board in 1997. Reflecting these developments, section A of this Report presents the basic features of the TC Strategy, and the approach to be taken to achieve its objectives. The Strategy addresses among others the recommendations contained in resolution GC(40)/RES/13 on the Strengthening of Technical Co-operation: activities to improve the scientific and technological capabilities of developing countries; to achieve sustainable

  3. An Analysis of the Organizational Structure of Redstone Test Centers Environmental and Components Test Directorate With Regard to Instrumentation Design Capabilities

    Science.gov (United States)

    2016-09-01

    to being the cause of them, resulting in increased absenteeism , lower productivity and grievances and so on” (Raina, 2010). And indeed, General...has on their equipment as well as the system under test. RTC is a test organization, and the end product of each test is data. These engineers design...analyze the data needed to create RTC’s end product . Currently, there are instrumentation groups throughout each of RTC’s directorates. AFTD has a

  4. Participation in testing and start up operations

    International Nuclear Information System (INIS)

    Prasad, Y.S.R.

    1977-01-01

    Testing and start up operations of a nuclear power plant require careful planning. A detailed program of tests and the responsibility of implementing them is discussed. Requirement of documentation covering the tests and operating procedures is explained. The performance of the system during normal and abnomal operating conditions is analysed and required are modifications carried out. Various phases of commissioning and their significance are explained. Preparation of maintenance documentation and training of operating and maintenance staff during this period are discussed. Necessity of close liaison between the regulatory body and the operating organization is explained. (orig.) [de

  5. Tritium Systems Test Assembly operator training program

    International Nuclear Information System (INIS)

    Kerstiens, F.L.

    1985-01-01

    Proper operator training is needed to help ensure the safe operation of fusion facilities by personnel who are qualified to carry out their assigned responsibilities. Operators control and monitor the Tritium Systems Test Assembly (TSTA) during normal, emergency, and maintenance phases. Their performance is critical both to operational safety, assuring no release of tritium to the atmosphere, and to the successful simulation of the fusion reaction progress. Through proper training we are helping assure that TSTA facility operators perform their assignments in a safe and efficient manner and that the operators maintain high levels of operational proficiency through continuing training, retraining, requalification, and recertification

  6. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  7. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  8. Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology Into NASA Programs Associated With the Human Exploration and Operations Mission Directorate

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2015-01-01

    This report is intended to help NASA program and project managers incorporate Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) technologies that have gone through Phase II of the SBIR program into NASA Human Exploration and Operations Mission Directorate (HEOMD) programs. Other Government and commercial project managers can also find this information useful.

  9. 76 FR 60370 - Consolidation of the Office of the Executive Director With the Office of the Chief Operating Officer

    Science.gov (United States)

    2011-09-29

    ... Executive Director) the functions of prescribing procurement regulations, entering into contracts, designating contracting officers, and making procurement determinations. We believe it is appropriate to...: PART 200--ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Subpart A--Organization and...

  10. Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology Into Human Exploration and Operations Mission Directorate Projects for 2016

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2017-01-01

    This report is intended to help NASA program and project managers incorporate Small Business Innovation Research Small Business Technology Transfer (SBIR/STTR) technologies into NASA Human Exploration and Operations Mission Directorate (HEOMD) projects. Other Government and commercial projects managers can also find this useful. Space Transportation; Life Support and Habitation Systems; Extra-Vehicular Activity; High EfficiencySpace Power; Human Exploration and Operations Mission,

  11. Testing Infrastructure for Operating System Kernel Development

    DEFF Research Database (Denmark)

    Walter, Maxwell; Karlsson, Sven

    2014-01-01

    Testing is an important part of system development, and to test effectively we require knowledge of the internal state of the system under test. Testing an operating system kernel is a challenge as it is the operating system that typically provides access to this internal state information. Multi......-core kernels pose an even greater challenge due to concurrency and their shared kernel state. In this paper, we present a testing framework that addresses these challenges by running the operating system in a virtual machine, and using virtual machine introspection to both communicate with the kernel...... and obtain information about the system. We have also developed an in-kernel testing API that we can use to develop a suite of unit tests in the kernel. We are using our framework for for the development of our own multi-core research kernel....

  12. HERBE- Analysis of test operation results

    International Nuclear Information System (INIS)

    Pesic, M. et.al.

    1991-01-01

    This document is part of the safety analyses performed for the RB reactor operation with the coupled fast-thermal system HERBE and is part of the final safety report together with the 'Report on test operation of HERBE for the period Dec. 15 1989 - May 15 1990. This report covers the following main topics: determination of reactivity variations dependent on the variations moderator critical level; determination of reactivity for the flooded neutron converter; and the accident analysis of neutron converter flooding

  13. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  14. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  15. Independent Directors

    DEFF Research Database (Denmark)

    Ringe, Wolf-Georg

    2013-01-01

    This paper re-evaluates the corporate governance concept of ‘board independence’ against the disappointing experiences during the 2007-08 financial crisis. Independent or outside directors had long been seen as an essential tool to improve the monitoring role of the board. Yet the crisis revealed...... that they did not prevent firms' excessive risk taking; further, these directors sometimes showed serious deficits in understanding the business they were supposed to control, and remained passive in addressing structural problems. A closer look reveals that under the surface of seemingly unanimous consensus...

  16. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    serial number, aad design information for majur components. Prescribes vehicle, major component, and system descrip- tive elements required; such as...mount operating characteristics. Discusses preparation for test, instrumentation, and facil- ities. Describes procedures for force measurement, carriage...backlash and accuracy, turret friction, gun balance, manual handcrank force , manual response ratio, weapon and sighting system backlash, power controller

  17. Operation of the hot test loop facilities

    International Nuclear Information System (INIS)

    Cheong, Moon Ki; Park, Choon Kyeong; Won, Soon Yeon; Yang, Sun Kyu; Cheong, Jang Whan; Cheon, Se Young; Song, Chul Hwa; Jeon, Hyeong Kil; Chang, Suk Kyu; Jeong, Heung Jun; Cho, Young Ro; Kim, Bok Duk; Min, Kyeong Ho

    1994-12-01

    The objective of this project is to obtain the available experimental data and to develop the measuring techniques through taking full advantage of the facilities. The facilities operated by the thermal hydraulics department have been maintained and repaired in order to carry out the thermal hydraulics tests necessary for providing the available data. The performance tests for double grid type bottom end piece which was improved on the debris filtering effectivity were performed using the PWR-Hot Test Loop. The CANDU-Hot Test Loop was operated to carry out the pressure drop tests and strength tests of fuel. The Cold Test Loop was used to obtain the local velocity data in subchannel within fuel bundle and to understand the characteristic of pressure drop required for improving the nuclear fuel and to develop the advanced measuring techniques. RCS Loop, which is used to measure the CHF, is presently under design and construction. B and C Loop is designed and constructed to assess the automatic depressurization safety system behavior. 4 tabs., 79 figs., 7 refs. (Author) .new

  18. Operator performance in non-destructive testing: A study of operator performance in a performance test

    Energy Technology Data Exchange (ETDEWEB)

    Enkvist, J.; Edland, A.; Svenson, Ola [Stockholm Univ. (Sweden). Dept. of Psychology

    2000-05-15

    In the process industries there is a need of inspecting the integrity of critical components without disrupting the process. Such in-service inspections are typically performed with non-destructive testing (NDT). In NDT the task of the operator is to (based on diagnostic information) decide if the component can remain in service or not. The present study looks at the performance in NDT. The aim is to improve performance, in the long run, by exploring the operators' decision strategies and other underlying factors and to this way find out what makes some operators more successful than others. Sixteen operators performed manual ultrasonic inspections of four test pieces with the aim to detect (implanted) cracks. In addition to these performance demonstration tests (PDT), the operators performed independent ability tests and filled out questionnaires. The results show that operators who trust their gut feeling more than the procedure (when the two come to different results) and that at the same time have a positive attitude towards the procedure have a higher PDT performance. These results indicate the need for operators to be motivated and confident when performing NDT. It was also found that the operators who performed better rated more decision criteria higher in the detection phase than the operators who performed worse. For characterizing it was the other way around. Also, the operators who performed better used more time, both detecting and characterizing, than the operators who performed worse.

  19. Operator performance in non-destructive testing: A study of operator performance in a performance test

    International Nuclear Information System (INIS)

    Enkvist, J.; Edland, A.; Svenson, Ola

    2000-05-01

    In the process industries there is a need of inspecting the integrity of critical components without disrupting the process. Such in-service inspections are typically performed with non-destructive testing (NDT). In NDT the task of the operator is to (based on diagnostic information) decide if the component can remain in service or not. The present study looks at the performance in NDT. The aim is to improve performance, in the long run, by exploring the operators' decision strategies and other underlying factors and to this way find out what makes some operators more successful than others. Sixteen operators performed manual ultrasonic inspections of four test pieces with the aim to detect (implanted) cracks. In addition to these performance demonstration tests (PDT), the operators performed independent ability tests and filled out questionnaires. The results show that operators who trust their gut feeling more than the procedure (when the two come to different results) and that at the same time have a positive attitude towards the procedure have a higher PDT performance. These results indicate the need for operators to be motivated and confident when performing NDT. It was also found that the operators who performed better rated more decision criteria higher in the detection phase than the operators who performed worse. For characterizing it was the other way around. Also, the operators who performed better used more time, both detecting and characterizing, than the operators who performed worse

  20. Beam tests and operation of superconducting cavities

    International Nuclear Information System (INIS)

    Akai, Kazunori

    1990-01-01

    Beam tests and operation of superconducting cavities conducted since the third workshop on RF superconductivity (Argonne, Sep. 1987) are reported in this paper. The paper is concerned particularly with electron machines. Storage and acceleration of the beam are discussed, focusing on the CERN test in SPS, the DESY test in PETRA, the superconducting injector at Darmstadt, and the KEK beam tests in T-AR. Then, long-term performance of the cavity in the ring is discussed focusing on Eacc (max) and O-value, environmental conditions, and operational experience in T-MR. RF controllability is addressed, centering on the Robinson stability, cavity tuning loop, quench detection and interlocks, recovery procedure, field calibration, and phase adjustment. Higher order modes are also discussed. Superconducting cavities have been operated successfully in accelerators. It has been confirmed that the superconducting cavities can be used stably for experimental use. For more than 5000 hours the cavities have indicated no essential degradation of the cavity performance. The study of long-term performance should be continued in longer range of period. (N.K.)

  1. Advisory expert system for test rig operator

    International Nuclear Information System (INIS)

    Zielczynski, P.

    1994-01-01

    The advisory expert system MAESTRO (Modular Advisory Expert System for Test Rig Operator) has been designed to guide the operator of large experimental installation during start-up, steady state and shut down. The installation is located in the research reactor MARIA in the Institute of Atomic Energy in Swierk, Poland. The system acquires and analyses on line signals from installation and performs two tasks in real time: leading the operator and monitoring of the installation (including signal validation). Systems tasks, architecture and knowledge representation concepts are described. The system is based on expert systems techniques what makes in phases of continuous change of process parameters and it has been achieved by special knowledge representation allowing its dynamical modification. (author). 147 refs, 42 figs, 5 tab

  2. Operational testing highlights of Fort St. Vrain

    International Nuclear Information System (INIS)

    Cadwell, J.J.; McEachern, D.W.; Read, J.W.; Simon, W.A.; Walker, R.F.

    1975-01-01

    The Fort St. Vrain program has progressed through construction, preoperational testing, fuel loading, initial criticality, and operational testing at power levels up to 2 percent related power. To date, all tests necessary before the rise to full power have been completed, and the rise-to-power program is expected to be resumed again in late 1975. Major plant systems, including the prestressed concrete reactor vessel and circulators, have demonstrated adequate performance. Extensive tests on the reactor core at zero power and up to 2 percent power have demonstrated the accuracy in the design predictions of such core characteristics as critical rod position, control system worths, neutron flux distributions, and temperature coefficients. Gaseous fission product release measurements to date have confirmed the extensive analytical estimates. 6 references

  3. INERT Atmosphere confinement operability test procedure

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site

  4. The LHC test string first operational experience

    CERN Document Server

    Bézaguet, Alain-Arthur; Casas-Cubillos, J; Coull, L; Cruikshank, P; Dahlerup-Petersen, K; Faugeras, Paul E; Flemsæter, B; Guinaudeau, H; Hagedorn, Dietrich; Hilbert, B; Krainz, G; Kos, N; Lavielle, D; Lebrun, P; Leo, G; Mathewson, A G; Missiaen, D; Momal, F; Parma, Vittorio; Quesnel, Jean Pierre; Richter, D; Riddone, G; Rijllart, A; Rodríguez-Mateos, F; Rohmig, P; Saban, R I; Schmidt, R; Serio, L; Skiadelli, M; Suraci, A; Tavian, L; Walckiers, L; Wallén, E; Van Weelderen, R; Williams, L; McInturff, A

    1996-01-01

    CERN operates the first version of the LHC Test String which consists of one quadrupole and three 10-m twin aperture dipole magnets. An experimental programme aiming at the validation of the LHC systems started in February 1995. During this programme the string has been powered 100 times 35 of which at 12.4 kA or above. The experiments have yielded a number of results some of which, like quench recovery for cryogenics, have modified the design of subsystems of LHC. Others, like controlled helium leaks in the cold bore and quench propagation bewteen magnets, have given a better understanding on the evolution of the phenomena inside a string of superconducting magnets cooled at superfluid helium temperatures. Following the experimental programme, the string will be powered up and powered down in one hour cycles as a fatigue test of the structure thus simulating 20 years of operation of LHC.

  5. Advanced Control Test Operation (ACTO) facility

    International Nuclear Information System (INIS)

    Ball, S.J.

    1987-01-01

    The Advanced Control Test Operation (ACTO) project, sponsored by the US Department of Energy (DOE), is being developed to enable the latest modern technology, automation, and advanced control methods to be incorporated into nuclear power plants. The facility is proposed as a national multi-user center for advanced control development and testing to be completed in 1991. The facility will support a wide variety of reactor concepts, and will be used by researchers from Oak Ridge National Laboratory (ORNL), plus scientists and engineers from industry, other national laboratories, universities, and utilities. ACTO will also include telecommunication facilities for remote users

  6. Choreographer Pre-Testing Code Analysis and Operational Testing.

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, David J. [Sandia National Laboratories (SNL-CA), Livermore, CA (United States); Harrison, Christopher B. [Sandia National Laboratories (SNL-CA), Livermore, CA (United States); Perr, C. W. [Sandia National Laboratories (SNL-CA), Livermore, CA (United States); Hurd, Steven A [Sandia National Laboratories (SNL-CA), Livermore, CA (United States)

    2014-07-01

    Choreographer is a "moving target defense system", designed to protect against attacks aimed at IP addresses without corresponding domain name system (DNS) lookups. It coordinates actions between a DNS server and a Network Address Translation (NAT) device to regularly change which publicly available IP addresses' traffic will be routed to the protected device versus routed to a honeypot. More details about how Choreographer operates can be found in Section 2: Introducing Choreographer. Operational considerations for the successful deployment of Choreographer can be found in Section 3. The Testing & Evaluation (T&E) for Choreographer involved 3 phases: Pre-testing, Code Analysis, and Operational Testing. Pre-testing, described in Section 4, involved installing and configuring an instance of Choreographer and verifying it would operate as expected for a simple use case. Our findings were that it was simple and straightforward to prepare a system for a Choreographer installation as well as configure Choreographer to work in a representative environment. Code Analysis, described in Section 5, consisted of running a static code analyzer (HP Fortify) and conducting dynamic analysis tests using the Valgrind instrumentation framework. Choreographer performed well, such that only a few errors that might possibly be problematic in a given operating situation were identified. Operational Testing, described in Section 6, involved operating Choreographer in a representative environment created through EmulyticsTM . Depending upon the amount of server resources dedicated to Choreographer vis-á-vis the amount of client traffic handled, Choreographer had varying degrees of operational success. In an environment with a poorly resourced Choreographer server and as few as 50-100 clients, Choreographer failed to properly route traffic over half the time. Yet, with a well-resourced server, Choreographer handled over 1000 clients without missrouting. Choreographer

  7. Motor operated valves problems tests and simulations

    Energy Technology Data Exchange (ETDEWEB)

    Pinier, D.; Haas, J.L.

    1996-12-01

    An analysis of the two refusals of operation of the EAS recirculation shutoff valves enabled two distinct problems to be identified on the motorized valves: the calculation methods for the operating torques of valves in use in the power plants are not conservative enough, which results in the misadjustement of the torque limiters installed on their motorizations, the second problem concerns the pressure locking phenomenon: a number of valves may entrap a pressure exceeding the in-line pressure between the disks, which may cause a jamming of the valve. EDF has made the following approach to settle the first problem: determination of the friction coefficients and the efficiency of the valve and its actuator through general and specific tests and models, definition of a new calculation method. In order to solve the second problem, EDF has made the following operations: identification of the valves whose technology enables the pressure to be entrapped: the tests and numerical simulations carried out in the Research and Development Division confirm the possibility of a {open_quotes}boiler{close_quotes} effect: determination of the necessary modifications: development and testing of anti-boiler effect systems.

  8. Motor operated valves problems tests and simulations

    International Nuclear Information System (INIS)

    Pinier, D.; Haas, J.L.

    1996-01-01

    An analysis of the two refusals of operation of the EAS recirculation shutoff valves enabled two distinct problems to be identified on the motorized valves: the calculation methods for the operating torques of valves in use in the power plants are not conservative enough, which results in the misadjustement of the torque limiters installed on their motorizations, the second problem concerns the pressure locking phenomenon: a number of valves may entrap a pressure exceeding the in-line pressure between the disks, which may cause a jamming of the valve. EDF has made the following approach to settle the first problem: determination of the friction coefficients and the efficiency of the valve and its actuator through general and specific tests and models, definition of a new calculation method. In order to solve the second problem, EDF has made the following operations: identification of the valves whose technology enables the pressure to be entrapped: the tests and numerical simulations carried out in the Research and Development Division confirm the possibility of a open-quotes boilerclose quotes effect: determination of the necessary modifications: development and testing of anti-boiler effect systems

  9. FY2012 Annual Report for Director Operational Test & Evaluation (DOT&E)

    Science.gov (United States)

    2012-01-01

    or theft due to inconsistent telecommuting policies, IA vulnerabilities, inadequate control of budget targets, and large account imbalances. • DEAMS...currently valid OMB control number. 1. REPORT DATE 2012 2. REPORT TYPE 3. DATES COVERED 00-00-2012 to 00-00-2012 4. TITLE AND SUBTITLE FY2012 Annual...rules of engagement) to circumvent controls and processes; and they assess the audit processes that are in place to catch fraud or theft. In addition

  10. The Level of Diagnostic Tests' Preparation Skills among the Teachers of the First Three Elementary Grades' Teachers at the Directorate of Education of Bani Kinana District

    Science.gov (United States)

    Yaghmour, Kholoud Subhi; Obaidat, Luai Taleb; Hamadneh, Qaseem Mohammad

    2016-01-01

    This study aimed at exploring the level of Diagnostic Tests' Preparation Skills among the teachers of the first Three Elementary Grades at the Directorate of Education of Bani Kinana District, and its relationship to the variables of gender, academic qualification, and years of experience. The sample of the study consisted of (264) male and female…

  11. Operation of the nuclear fuel cycle test facilities -Operation of the hot test loop facilities

    International Nuclear Information System (INIS)

    Chun, S. Y.; Jeong, M. K.; Park, C. K.; Yang, S. K.; Won, S. Y.; Song, C. H.; Jeon, H. K.; Jeong, H. J.; Cho, S.; Min, K. H.; Jeong, J. H.

    1997-01-01

    A performance and reliability of a advanced nuclear fuel and reactor newly designed should be verified by performing the thermal hydraulics tests. In thermal hydraulics research team, the thermal hydraulics tests associated with the development of an advanced nuclear fuel and reactor haven been carried out with the test facilities, such as the Hot Test Loop operated under high temperature and pressure conditions, Cold Test Loop, RCS Loop and B and C Loop. The objective of this project is to obtain the available experimental data and to develop the advanced measuring techniques through taking full advantage of the facilities. The facilities operated by the thermal hydraulics research team have been maintained and repaired in order to carry out the thermal hydraulics tests necessary for providing the available data. The performance tests for the double grid type bottom end piece which was improved on the debris filtering effectivity were performed using the PWR-Hot Test Loop. The CANDU-Hot Test Loop was operated to carry out the pressure drop tests and strength tests of CANFLEX fuel. The Cold Test Loop was used to obtain the local velocity data in subchannel within HANARO fuel bundle and to study a thermal mixing characteristic of PWR fuel bundle. RCS thermal hydraulic loop was constructed and the experiments have been carried out to measure the critical heat flux. In B and C Loop, the performance tests for each component were carried out. (author). 19 tabs., 78 figs., 19 refs

  12. Operation of the nuclear fuel cycle test facilities -Operation of the hot test loop facilities

    Energy Technology Data Exchange (ETDEWEB)

    Chun, S. Y.; Jeong, M. K.; Park, C. K.; Yang, S. K.; Won, S. Y.; Song, C. H.; Jeon, H. K.; Jeong, H. J.; Cho, S.; Min, K. H.; Jeong, J. H.

    1997-01-01

    A performance and reliability of a advanced nuclear fuel and reactor newly designed should be verified by performing the thermal hydraulics tests. In thermal hydraulics research team, the thermal hydraulics tests associated with the development of an advanced nuclear fuel and reactor haven been carried out with the test facilities, such as the Hot Test Loop operated under high temperature and pressure conditions, Cold Test Loop, RCS Loop and B and C Loop. The objective of this project is to obtain the available experimental data and to develop the advanced measuring techniques through taking full advantage of the facilities. The facilities operated by the thermal hydraulics research team have been maintained and repaired in order to carry out the thermal hydraulics tests necessary for providing the available data. The performance tests for the double grid type bottom end piece which was improved on the debris filtering effectivity were performed using the PWR-Hot Test Loop. The CANDU-Hot Test Loop was operated to carry out the pressure drop tests and strength tests of CANFLEX fuel. The Cold Test Loop was used to obtain the local velocity data in subchannel within HANARO fuel bundle and to study a thermal mixing characteristic of PWR fuel bundle. RCS thermal hydraulic loop was constructed and the experiments have been carried out to measure the critical heat flux. In B and C Loop, the performance tests for each component were carried out. (author). 19 tabs., 78 figs., 19 refs.

  13. Aerosol can puncture device operational test plan

    International Nuclear Information System (INIS)

    Leist, K.J.

    1994-01-01

    Puncturing of aerosol cans is performed in the Waste Receiving and Processing Facility Module 1 (WRAP 1) process as a requirement of the waste disposal acceptance criteria for both transuranic (TRU) waste and low-level waste (LLW). These cans have contained such things as paints, lubricating oils, paint removers, insecticides, and cleaning supplies which were used in radioactive facilities. Due to Westinghouse Hanford Company (WHC) Fire Protection concerns of the baseline system's fire/explosion proof characteristics, a study was undertaken to compare the baseline system's design to commercially available puncturing devices. While the study found no areas which might indicate a risk of fire or explosion, WHC Fire Protection determined that the puncturing system must have a demonstrated record of safe operation. This could be obtained either by testing the baseline design by an independent laboratory, or by substituting a commercially available device. As a result of these efforts, the commercially available Aerosolv can puncturing device was chosen to replace the baseline design. Two concerns were raised with the system. Premature blinding of the coalescing/carbon filter, due to its proximity to the puncture and draining operation; and overpressurization of the collection bottle due to its small volume and by blinding of the filter assembly. As a result of these concerns, testing was deemed necessary. The objective of this report is to outline test procedures for the Aerosolv

  14. Operating experience of steam generator test facility

    International Nuclear Information System (INIS)

    Sureshkumar, V.A.; Madhusoodhanan, G.; Noushad, I.B.; Ellappan, T.R.; Nashine, B.K.; Sylvia, J.I.; Rajan, K.K.; Kalyanasundaram, P.; Vaidyanathan, G.

    2006-01-01

    Steam Generator (SG) is the vital component of a Fast Reactor. It houses both water at high pressure and sodium at low pressure separated by a tube wall. Any damage to this barrier initiates sodium water reaction that could badly affect the plant availability. Steam Generator Test Facility (SGTF) has been set up in Indira Gandhi Centre for Atomic Research (IGCAR) to test sodium heated once through steam generator of 19 tubes similar to the PFBR SG dimension and operating conditions. The facility is also planned as a test bed to assess improved designs of the auxiliary equipments used in Fast Breeder Reactors (FBR). The maximum power of the facility is 5.7 MWt. This rating is arrived at based on techno economic consideration. This paper covers the performance of various equipments in the system such as Electro magnetic pumps, Centrifugal sodium pump, in-sodium hydrogen meters, immersion heaters, and instrumentation and control systems. Experience in the system operation, minor modifications, overall safety performance, and highlights of the experiments carried out etc. are also brought out. (author)

  15. Buffer mass test - Heater design and operation

    International Nuclear Information System (INIS)

    Nilsson, J.; Ramqvist, G.; Pusch, R.

    1984-06-01

    The nuclear waste is assumed to be contained in cylindrical metal canisters which will be inserted in deposition holes. Heat is generated as a result of the continuing decay of the radioactive waste and in the Buffer Mass Test (BMT) the heat flux expected from such canisters was simulated by the use of six electric heaters. the heaters were constructed partly of aluminium and partly of stainless steel. They are 1520 mm in length and 380 mm in diameter, and give a maximum power output of 3000 W. The heater power can be monitored by panel meters coupled to a computer-based data acquisition system. Both the heater and the control system were manufactured with a high degree of redundancy in case of component failure. This report describes the design, construction, testing, installation and necessary tools for heater installation and dismantling operation. (author)

  16. 23rd June 2010 - IATA Director-General and CEO G. Bisignani signing the guest book with Research and Computing Director S. Bertolucci; visiting the LHC superconducting magnet test hall with L. Bottura; throughout accompanied by Adviser for International relations M. Bona.

    CERN Multimedia

    Maximilien Brice

    2010-01-01

    23rd June 2010 - IATA Director-General and CEO G. Bisignani signing the guest book with Research and Computing Director S. Bertolucci; visiting the LHC superconducting magnet test hall with L. Bottura; throughout accompanied by Adviser for International relations M. Bona.

  17. 2 March 2012 - US Google Management Team Executive Chairman E. Schmidt visiting the LHC superconducting magnet test hall with Director for Accelerators and Technology S. Myers and Head of Technology Department F. Bordry; signing the guest book with CERN Director-General R. Heuer.

    CERN Multimedia

    Maximilien Brice

    2012-01-01

    2 March 2012 - US Google Management Team Executive Chairman E. Schmidt visiting the LHC superconducting magnet test hall with Director for Accelerators and Technology S. Myers and Head of Technology Department F. Bordry; signing the guest book with CERN Director-General R. Heuer.

  18. 200 Area treated effluent disposal facility operational test report

    International Nuclear Information System (INIS)

    Crane, A.F.

    1995-01-01

    This document reports the results of the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These completed operational testing activities demonstrated the functional, operational and design requirements of the 200 Area TEDF have been met

  19. Supercritical CO2 test loop operation and first test results

    International Nuclear Information System (INIS)

    Wright, Steven A.; Pickard, Paul S.

    2009-01-01

    The DOE Office of Nuclear Energy is investigating advanced Brayton cycles for use with next generation nuclear power plants. The focus of this work is on the supercritical CO 2 Brayton cycle which has the potential for high efficiency, and for reduced capital costs due to very compact turbomachinery. Sandia has fabricated and is operating a supercritical CO 2 (S-CO 2 ) test loop to investigate the key technology issues associated with this cycle. This loop is part of a multi-year phased development program to develop a megawatt (MW) class closed S-CO 2 Brayton cycle to demonstrate the applicability of this cycle for DOE Gen-IV program. The current loop has been configured as both a compression loop and as simple heated but unrecuperated Brayton cycle. A second split-flow or re-compression Brayton cycle is currently under development that will use approximately 1 MW of heat to run the Brayton cycle. Early configurations of this split-flow Brayton cycle will be operational later this fiscal year. The key issues for this cycle include the fundamental issues of compressor fluid performance and system control near the critical point, but also the supporting technology issues of bearings, sealing technologies, and rotor windage losses which are also essential to achieving efficiency and cost objectives. These tests are providing the first measurements and information on these key supercritical CO 2 power conversion systems questions. Important data for all these issues has been obtained. This report presents the major results of the testing by showing and comparing the measured compressor performance map with the predicted performance. The compression loop uses a ∼50 kWe motor driven compressor to spin a 37 mm OD compressor at design speeds up to 75,000 rpm with a pressure ratio of 1.8 and a flow rate of 3.53 kg/s for a compressor inlet condition of 305.3 K and 7690 kPa. The most recent configuration of this loop has added a small turbine and 260 kW of heater power is

  20. The Director of Mobility Forces' Role in the Command Control of Air Mobility Assets During Humanitarian Relief Operations

    National Research Council Canada - National Science Library

    Bush, Timothy E

    2000-01-01

    ...). Air Force doctrine recommends a command and control (C2) structure that permits the same organizational concept to be used throughout the spectrum of conflict, tailored to suit the specific operational objectives of a Joint Task Force (JFT...

  1. Field operational tests of Smartway in Japan

    Directory of Open Access Journals (Sweden)

    Fumihiko Kanazawa

    2010-07-01

    Full Text Available Efforts are underway in Japan to promote “Smartway” next-generation roadways, which provide a variety of services through the use of advanced ITS technologies. In recent years, the National Institute for Land and Infrastructure Management (NILIM, part of the Ministry of Land, Infrastructure, Transport and Tourism (MLIT, has conducted public–private joint research on next-generation road services using ITS technologies. Field operational tests (FOTs of services including forward obstacle information provision and merging assistance using 5.8 GHz dedicated short range communication (DSRC were conducted on the Tokyo Metropolitan Expressway through FY2007. In FY2008–2009, FOTs were conducted in three major metropolitan areas—Tokyo, Nagoya, and Keihanshin (Kyoto, Osaka, and Kobe—to promote future deployment nationwide. These included tests of information provision services to alert drivers to forward obstacles hidden beyond the crest of an incline and prevent excessive speed on sharp curves. This paper presents an overview of these FOTs conducted by NILIM in recent years and their results.

  2. 12 CFR 7.2010 - Directors' responsibilities.

    Science.gov (United States)

    2010-01-01

    ... refer to OCC published guidance for additional information regarding responsibilities of directors. ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Directors' responsibilities. 7.2010 Section 7... OPERATIONS Corporate Practices § 7.2010 Directors' responsibilities. The business and affairs of the bank...

  3. Director's report.

    Science.gov (United States)

    Pathak, K B

    1993-07-01

    The director's report for the International Institute for Population Sciences in Bombay, India, provides descriptions of the Institute's teaching programs, research, publications, seminars, library collection, visitors, faculty and staff, and special events. The teaching programs include regular instruction in one-year diploma courses in population studies and a masters and a masters in philosophy in population studies; a diploma is also available in health education. Student represent a variety of countries for the diploma programs, while the other certificate programs draw on the national population. A listing is provided of those receiving certificates. Research programs are listed by whether the program was completed during 1992-93 or earlier or is a new project. The Institute conducts a National Family Welfare Survey among 23 states. This household survey is directed to women and supplies village level data. The Institute publishes a quarterly newsletter about ongoing activities and a biennial compendium of research findings. The Institute observes World Population Day and organized the 10th Annual Convention on Medical Statistics and other conferences. The Institute held the first meeting of the National Council of Population Research on September 21, 1992, and the designated subcommittee members met on November 14, 1992. The library recently added 1117 volumes, which contributed to the total library collection of 55,539 volumes, including 8000 bound periodicals and 12,615 reprints. Several high government officials visited the Institute in 1992. Other visitors came from the US, Bangladesh, and the UN. The Institute is comprised of six academic departments with computer and library resources. Staff were involved a few overseas tours of study. Founders day is celebrated as a cultural event.

  4. Decreasing delays in urgent and expedited surgery in a university teaching hospital through audit and communication between peri-operative and surgical directorates.

    Science.gov (United States)

    Cosgrove, J F; Gaughan, M; Snowden, C P; Lees, T

    2008-06-01

    National Confidential Enquiry into Patient Outcome and Death guidelines for urgent surgery recommend a fully staffed emergency operating theatre and restriction of 'after-midnight' operating to immediate life-, limb- or organ-threatening conditions. Audit performed in our institution demonstrated significant decreases in waiting times for urgent surgery and an increased seniority of medical care associated with overnight pre-operative assessment of patients by anaesthetic trainees. Nevertheless, urgent cases continued to be delayed unnecessarily. A classification of delays was developed from existing guidelines and their incidence was audited. The results were disseminated to involved directorates. A repeat of the audit demonstrated a significant decrease in delays (p = 0.001), a significant increase in the availability of surgeons (p = 0.001) and a significant decrease in the median waiting time for urgent surgery compared to the first audit cycle and a previous standard (p auditing delays and disseminating the results of the audit significantly decreases delays and median waiting times for urgent surgery because of improved surgical availability.

  5. Operational Based Vision Assessment Cone Contrast Test: Description and Operation

    Science.gov (United States)

    2016-06-02

    time and even between monitors from the same manufacturer. Because of this, the system will include a colorimeter that can test the system to see if...it is in the proper state. If the system is out of calibration, the colorimeter and custom software can be used to return the system to the

  6. Global Environmental Micro Sensors Test Operations in the Natural Environment

    Science.gov (United States)

    Adams, Mark L.; Buza, Matthew; Manobianco, John; Merceret, Francis J.

    2007-01-01

    ENSCO, Inc. is developing an innovative atmospheric observing system known as Global Environmental Micro Sensors (GEMS). The GEMS concept features an integrated system of miniaturized in situ, airborne probes measuring temperature, relative humidity, pressure, and vector wind velocity. In order for the probes to remain airborne for long periods of time, their design is based on a helium-filled super-pressure balloon. The GEMS probes are neutrally buoyant and carried passively by the wind at predetermined levels. Each probe contains onboard satellite communication, power generation, processing, and geolocation capabilities. ENSCO has partnered with the National Aeronautics and Space Administration's Kennedy Space Center (KSC) for a project called GEMS Test Operations in the Natural Environment (GEMSTONE) that will culminate with limited prototype flights of the system in spring 2007. By leveraging current advances in micro and nanotechnology, the probe mass, size, cost, and complexity can be reduced substantially so that large numbers of probes could be deployed routinely to support ground, launch, and landing operations at KSC and other locations. A full-scale system will improve the data density for the local initialization of high-resolution numerical weather prediction systems by at least an order of magnitude and provide a significantly expanded in situ data base to evaluate launch commit criteria and flight rules. When applied to launch or landing sites, this capability will reduce both weather hazards and weather-related scrubs, thus enhancing both safety and cost-avoidance for vehicles processed by the Shuttle, Launch Services Program, and Constellation Directorates. The GEMSTONE project will conclude with a field experiment in which 10 to 15 probes are released over KSC in east central Florida. The probes will be neutrally buoyant at different altitudes from 500 to 3000 meters and will report their position, speed, heading, temperature, humidity, and

  7. Airborne Data Link Operational Evaluation Test Plan

    Science.gov (United States)

    1993-08-01

    This plan describes an end-to-end study of operational concepts and procedures associated with the introduction of electronic data communications between flight crews and air traffic controllers. Full performance controllers from : terminal facilitie...

  8. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  9. US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards

    International Nuclear Information System (INIS)

    1993-05-01

    The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all

  10. US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all.

  11. 22 February 2011 - German Ambassador to Switzerland A. Berg signing the guest book with CERN Director-General R. Heuer and visiting the LHC superconducting magnet test hall with Technology Department Head F. Bordry.

    CERN Multimedia

    Maximilien Brice

    2011-01-01

    22 February 2011 - German Ambassador to Switzerland A. Berg signing the guest book with CERN Director-General R. Heuer and visiting the LHC superconducting magnet test hall with Technology Department Head F. Bordry.

  12. 28 September 2011 - Canadian Intellectual Property Office Policy, International and Research Office Director K. Georgaras visiting the LHC superconducting magnet test hall with Engineer M. Bajko and Senior Scientists P. Jenni and R. Voss.

    CERN Multimedia

    2011-01-01

    28 September 2011 - Canadian Intellectual Property Office Policy, International and Research Office Director K. Georgaras visiting the LHC superconducting magnet test hall with Engineer M. Bajko and Senior Scientists P. Jenni and R. Voss.

  13. 4 August 2011 - Austrian Head of Protocol, Directorate General III, Federal Ministry of Science and Research I. Friedrich (3rd from left) in the LHC superconducting magnet test hall with M. Benedkit, C. Wulz and C. Fabjan.

    CERN Multimedia

    Maximilien Brice

    2011-01-01

    4 August 2011 - Austrian Head of Protocol, Directorate General III, Federal Ministry of Science and Research I. Friedrich (3rd from left) in the LHC superconducting magnet test hall with M. Benedkit, C. Wulz and C. Fabjan.

  14. 18 August 2011 - Armenian Yerevan Physics Institute Director A. Chilingarian visiting the LHC superconducting magnet test hall with A. Ballarino; signing the guest book with Adviser T. Kurtyka and Head of International Relations F. Pauss.

    CERN Multimedia

    Benoit Jeannet

    2011-01-01

    18 August 2011 - Armenian Yerevan Physics Institute Director A. Chilingarian visiting the LHC superconducting magnet test hall with A. Ballarino; signing the guest book with Adviser T. Kurtyka and Head of International Relations F. Pauss.

  15. Operational test report for LERF Basin 242AL-44 integrity test

    International Nuclear Information System (INIS)

    Galioto, T.M.

    1994-01-01

    This operational test report documents the results of LERF operational testing per operational test procedure (OTP) TFPE-WP-0231, ''LERF Basin Integrity Testing.'' The primary purpose of the OTP was to resolve test exceptions generated as a result of TFPE-WP-0184. The TOP was prepared and performed in accordance with WHC-SD-534-OTP-002, ''Operational Test Plan for the 242-A Evaporator Upgrades and the Liquid Effluent Retention Facility.'' WHC-S-086, ''Specification for Operational Testing of the Liquid Effluent Retention Facility, Basin Integrity Testing,'' identified the test requirements and acceptance criteria. The completed, signed-off test procedure is contained in Appendix A. The test log is contained in Appendix B. Section 2.1 describes all the test exceptions written during performance of the Operational Test Procedure. The test revisions generated during the testing are discussed in Section 2.2. The dispositioned test exception forms are contained in Appendix C

  16. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  17. Directors General appointed

    CERN Multimedia

    1975-01-01

    At a special session on 21 March, presided over by P. Levaux, the Council of the European Organization for Nuclear Research appointed J . B. Adams and L . Van Hove as Directors General of the Organization for a period of five years beginning 1 January 1976. Dr. Adams will be responsible for the administration of CERN, for the operation of the equipment and services and for the construction of buildings and major equipment. Professor Van Hove will be responsible for the research activities of the Organization.

  18. The Sub-directorate of Operational Radiological Protection is an area of the CSN that oversees the safety of the workers; La Subdireccion de Proteccion Radiologica Operacional, un area del CSN que vela por la Seguridad de los trabajadores

    Energy Technology Data Exchange (ETDEWEB)

    Scialdone Garcia, A.

    2016-08-01

    The safety of radioactive facilities is an essential part of the radiological protection of the more than 100,000 workers who are professionally exposed to ionising radiations. The Sub-directorate of Operational Radiological Protection is in charge of this task and of authorising the more than 1,340 radioactive facilities that are distributed across the country and ensuring their safety. (Author)

  19. Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology Into Human Exploration and Operations Mission Directorate Projects at Glenn Research Center for 2015

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2016-01-01

    This report is intended to help NASA program and project managers incorporate Glenn Research Center Small Business Innovation Research/Small Business Technology Transfer (SBIR)/(STTR) technologies into NASA Human Exploration and Operations Mission Directorate (HEOMD) programs and projects. Other Government and commercial project managers can also find this useful. Introduction Incorporating Small Business Innovation Research (SBIR)-developed technology into NASA projects is important, especially given the Agency's limited resources for technology development. The SBIR program's original intention was for technologies that had completed Phase II to be ready for integration into NASA programs, however, in many cases there is a gap between Technology Readiness Levels (TRLs) 5 and 6 that needs to be closed. After SBIR Phase II projects are completed, the technology is evaluated against various parameters and a TRL rating is assigned. Most programs tend to adopt more mature technologies-at least TRL 6 to reduce the risk to the mission rather than adopt TRLs between 3 and 5 because those technologies are perceived as too risky. The gap between TRLs 5 and 6 is often called the "Valley of Death" (Figure 1), and historically it has been difficult to close because of a lack of funding support from programs. Several papers have already suggested remedies on how to close the gap (Refs. 1 to 4).

  20. Light duty utility arm (LDUA) operability test report (OTR)

    International Nuclear Information System (INIS)

    Conrad, R.B.

    1997-01-01

    The objective of the test was to demonstrate that the LDUA and subsystems that are applicable to the T-106 deployment could be safely deployed in the field and operated as designed per the operating procedures

  1. Operational test report for 2706-T complex liquid transfer system

    International Nuclear Information System (INIS)

    BENZEL, H.R.

    1999-01-01

    This document is the Operational Test Report (OTR). It enters the Record Copy of the W-259 Operational Test Procedure (HNF-3610) into the document retrieval system. Additionally, the OTR summarizes significant issues associated with testing the 2706-T waste liquid transfer and storage system

  2. Melter operation results in chemical test at Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Kanehira, Norio; Yoshioka, Masahiro; Muramoto, Hitoshi; Oba, Takaaki; Takahashi, Yuji

    2005-01-01

    Chemical Test of the glass melter system of the Vitrification Facility at Rokkasho Reprocessing Plant (RRP) was performed. In this test, basic performance of heating-up of the melter, melting glass, pouring glass was confirmed using simulated materials. Through these tests and operation of all modes, good results were gained, and training of operators was completed. (author)

  3. Test results and operational characteristics of prototype SSCL half cell

    International Nuclear Information System (INIS)

    McInturff, A.D.; Burgett, W.; Carter, H.

    1994-01-01

    The SSCL Accelerator System's String Test (ASST) has had several cool down, subsequent operational test series, and warm up cycles. The first cycle of these was rather limited in scope as mandated by Congress. The subsequent tests have been performed to obtain more complete information about parameters of, or operating experience with, the ensemble of magnets and spools when operating serially as in accelerator operations. The tests and procedures performed to date have emphasized cryogenic, mechanical, and electrical operations. These have included running, as well as upset conditions, i.e., superconducting to normal transition of the string (quench). This paper represents a summary of the operational test results and characteristics seen to date. A limited discussion will be included as to their implications with respect to a successful accelerator operation

  4. Operator coil monitoring Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software's ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ''ENABLE'' and ''DISABLE'' controls from the Master and RSS stations function correctly, and only with the use of proper passwords

  5. Operational test of bonded magnetocaloric plates

    DEFF Research Database (Denmark)

    Bahl, Christian; Navickaité, Kristina; Neves Bez, Henrique

    2017-01-01

    Bonded plates made by hot pressing La0.85Ce0.15Fe11.25Mn0.25Si1.5Hy particles and resin have been tested as active magnetic regenerators in a small scale magnetocaloric device. Firstly the plates were carefully characterised magnetically and thermally. The plates were prepared with 5 wt% resin...

  6. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. Mission Operations Directorate - Success Legacy of the Space Shuttle Program (Overview of the Evolution and Success Stories from MOD During the Space Shuttle program)

    Science.gov (United States)

    Azbell, Jim A.

    2011-01-01

    In support of the Space Shuttle Program, as well as NASA's other human space flight programs, the Mission Operations Directorate (MOD) at the Johnson Space Center has become the world leader in human spaceflight operations. From the earliest programs - Mercury, Gemini, Apollo - through Skylab, Shuttle, ISS, and our Exploration initiatives, MOD and its predecessors have pioneered ops concepts and emphasized a history of mission leadership which has added value, maximized mission success, and built on continual improvement of the capabilities to become more efficient and effective. This paper provides specific examples that illustrate how MOD's focus on building and contributing value with diverse teams has been key to their successes both with the US space industry and the broader international community. This paper will discuss specific examples for the Plan, Train, Fly, and Facilities aspects within MOD. This paper also provides a discussion of the joint civil servant/contractor environment and the relative badge-less society within MOD. Several Shuttle mission related examples have also been included that encompass all of the aforementioned MOD elements and attributes, and are used to show significant MOD successes within the Shuttle Program. These examples include the STS-49 Intelsat recovery and repair, the (post-Columbia accident) TPS inspection process and the associated R-Bar Pitch Maneuver for ISS missions, and the STS-400 rescue mission preparation efforts for the Hubble Space Telescope repair mission. Since their beginning, MOD has consistently demonstrated their ability to evolve and respond to an ever changing environment, effectively prepare for the expected and successfully respond to the unexpected, and develop leaders, expertise, and a culture that has led to mission and Program success.

  8. Prediction of software operational reliability using testing environment factors

    International Nuclear Information System (INIS)

    Jung, Hoan Sung; Seong, Poong Hyun

    1995-01-01

    For many years, many researches have focused on the quantification of software reliability and there are many models developed to quantify software reliability. Most software reliability models estimate the reliability with the failure data collected during the test assuming that the test environments well represent the operation profile. The experiences show that the operational reliability is higher than the test reliability User's interest is on the operational reliability rather than on the test reliability, however. With the assumption that the difference in reliability results from the change of environment, testing environment factors comprising the aging factor and the coverage factor are defined in this study to predict the ultimate operational reliability with the failure data. It is by incorporating test environments applied beyond the operational profile into testing environment factors. The application results are close to the actual data

  9. Operational reliability testing of FBR fuel in EBR-II

    International Nuclear Information System (INIS)

    Asaga, Takeo; Ukai, Shigeharu; Nomura, Shigeo; Shikakura, Sakae

    1991-01-01

    The operational reliability testing of FBR fuel has been conducting in EBR-II as a DOE/PNC collaboration program. This paper reviews the achieved summary of Phase-I test as well as outline of progressing Phase-II test. In Phase-I test, the reliability of FBR fuel pins including 'MONJU' fuel was demonstrated at the event of operational transient. Continued operation of the failed pins was also shown to be feasible without affecting the plant operation. The objectives of the Phase-II test is to extend the data base relating with the operational reliability for long life fuel, and to supply the highly quantitative evaluation. The valuable insight obtained in Phase-II test are considerably expected to be useful toward the achievement of commercial FBR. (author)

  10. Operational Based Vision Assessment Automated Vision Test Collection User Guide

    Science.gov (United States)

    2017-05-15

    AFRL-SA-WP-SR-2017-0012 Operational Based Vision Assessment Automated Vision Test Collection User Guide Elizabeth Shoda, Alex...June 2015 – May 2017 4. TITLE AND SUBTITLE Operational Based Vision Assessment Automated Vision Test Collection User Guide 5a. CONTRACT NUMBER... automated vision tests , or AVT. Development of the AVT was required to support threshold-level vision testing capability needed to investigate the

  11. Test Operations Procedure (TOP) 06-2-301 Wind Testing

    Science.gov (United States)

    2017-06-14

    The wind direction should be perpendicular to the faces selected for exposure. If testing is performed outdoors, cross winds can change the wind...14 June 2017 4 b. The item geometry will influence the requirements for the wind direction tolerance. For example , if the item is symmetrical...3 3.2 Wind Direction

  12. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  13. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  14. Fast Flux Test Facility sodium pump operating experience - mechanical

    International Nuclear Information System (INIS)

    Buonamici, R.

    1987-11-01

    The Heat Transport System (HTS) pumps were designed, fabricated, tested, and installed in the Fast Flux Test Facility (FFTF) Plant during the period from September 1970 through July 1977. Since completion of the installation and sodium fill in December 1978, the FFTF Plant pumps have undergone extensive testing and operation with HTS testing and reactor operation. Steady-state hydraulic and mechanical performances have been and are excellent. In all, FFTF primary and secondary pumps have operated in sodium for approximately 75,000 hours and 79,000 hours, respectively, to August 24, 1987

  15. Establishment and operation of a photovoltaic cell test facility

    Energy Technology Data Exchange (ETDEWEB)

    Pearsall, N.M.; Forbes, I.

    1999-07-01

    This report describes the setting up of a test facility at the University of Northumbria. Details of the equipment specification and procurement are given, and the commissioning and initial operation of the facility, and the measurement procedures for I-V characteristics, spectral response measurements, optical scanning and test charges are outlined. The business plan for the test facility is discussed, and operating experience is reviewed in terms of publicity, services provided, and collaboration.

  16. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  17. Radiological operating experience at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Bunch, W.L.; Prevo, P.R.

    1986-11-01

    The Fast Flux Test Facility has been in operation for approximately five years, including about one thousand days of full power operation of the Fast Test Reactor. During that time the collective dose equivalents received by operating personnel have been about two orders of magnitude lower than those typically received at commercial light water reactors. No major contamination problems have been encountered in operating and maintaining the plant, and release of radioactive gas to the environment has been minimal and well below acceptable limits. All shields have performed satisfactorily. Experience to date indicates an apparent radiological superiority of liquid metal reactor systems over current light water plants

  18. Test tube systems with cutting/recombination operations

    Energy Technology Data Exchange (ETDEWEB)

    Freund, R. [Technische Universitaet Wien (Austria); Csuhaj-Varju, E. [Computer and Automation Institute, Budapest (Hungary); Wachtler, F. [Universitaet Wien (Austria)

    1996-12-31

    We introduce test tube systems based on operations that are closely related to the splicing operations, i.e. we consider the operations of cutting a string at a specific site into two pieces with marking them at the cut ends and of recombining two strings with specifically marked endings. Whereas in the splicing of two strings these strings are cut at specific sites and the cut pieces are recombined immediately in a crosswise way, in CR(cutting/recombination)-schemes cutting can happen independently from recombining the cut pieces. Test tube systems based on these operations of cutting and recombination turn out to have maximal generative power even if only very restricted types of input filters for the test tubes are used for the redistribution of the contents of the test tubes after a period of cuttings and recombinations in the test tubes. 10 refs.

  19. Prediction of software operational reliability using testing environment factors

    International Nuclear Information System (INIS)

    Jung, Hoan Sung; Seong, Poong Hyun

    1995-01-01

    A number of software reliability models have been developed to estimate and to predict software reliability. However, there are no established standard models to quantify software reliability. Most models estimate the quality of software in reliability figures such as remaining faults, failure rate, or mean time to next failure at the testing phase, and they consider them ultimate indicators of software reliability. Experience shows that there is a large gap between predicted reliability during development and reliability measured during operation, which means that predicted reliability, or so-called test reliability, is not operational reliability. Customers prefer operational reliability to test reliability. In this study, we propose a method that predicts operational reliability rather than test reliability by introducing the testing environment factor that quantifies the changes in environments

  20. W-026, transuranic waste restricted waste management (TRU RWM) glovebox operational test report

    Energy Technology Data Exchange (ETDEWEB)

    Leist, K.J.

    1998-02-18

    The TRU Waste/Restricted Waste Management (LLW/PWNP) Glovebox 401 is designed to accept and process waste from the Transuranic Process Glovebox 302. Waste is transferred to the glovebox via the Drath and Schraeder Bagless Transfer Port (DO-07401) on a transfer stand. The stand is removed with a hoist and the operator inspects the waste (with the aid of the Sampling and Treatment Director) to determine a course of action for each item. The waste is separated into compliant and non compliant. One Trip Port DO-07402A is designated as ``Compliant``and One Trip Port DO-07402B is designated as ``Non Compliant``. As the processing (inspection, bar coding, sampling and treatment) of the transferred items takes place, residue is placed in the appropriate One Trip port. The status of the waste items is tracked by the Data Management System (DMS) via the Plant Control System (PCS) barcode interface. As an item is moved for sampling or storage or it`s state altered by treatment, the Operator will track an items location using a portable barcode reader and entry any required data on the DMS console. The Operational Test Procedure (OTP) will perform evolutions (described here) using the Plant Operating Procedures (POP) in order to verify that they are sufficient and accurate for controlled glovebox operation.

  1. W-026, transuranic waste restricted waste management (TRU RWM) glovebox operational test report

    International Nuclear Information System (INIS)

    Leist, K.J.

    1998-01-01

    The TRU Waste/Restricted Waste Management (LLW/PWNP) Glovebox 401 is designed to accept and process waste from the Transuranic Process Glovebox 302. Waste is transferred to the glovebox via the Drath and Schraeder Bagless Transfer Port (DO-07401) on a transfer stand. The stand is removed with a hoist and the operator inspects the waste (with the aid of the Sampling and Treatment Director) to determine a course of action for each item. The waste is separated into compliant and non compliant. One Trip Port DO-07402A is designated as ''Compliant''and One Trip Port DO-07402B is designated as ''Non Compliant''. As the processing (inspection, bar coding, sampling and treatment) of the transferred items takes place, residue is placed in the appropriate One Trip port. The status of the waste items is tracked by the Data Management System (DMS) via the Plant Control System (PCS) barcode interface. As an item is moved for sampling or storage or it's state altered by treatment, the Operator will track an items location using a portable barcode reader and entry any required data on the DMS console. The Operational Test Procedure (OTP) will perform evolutions (described here) using the Plant Operating Procedures (POP) in order to verify that they are sufficient and accurate for controlled glovebox operation

  2. SMART operational field test evaluation : dispatchers survey report : final report

    Science.gov (United States)

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automaticscheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans toimplement ITS as a site for an operational field test. The purpo...

  3. SMART operational field test evaluation : scheduler survey report : final report

    Science.gov (United States)

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...

  4. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  5. 1 November 2012 - Signature of the Co-operation Agreement between the Administrative Department of Science, Technology and Innovation (COLCIENCIAS) of Colombia and the European Organization for Nuclear Research (CERN) concerning Scientific and Technical Co-operation in High-Energy Physics and related technologies by CERN Director-General R. Heuer, witnessed by Ambassador of Colombia to Switzerland C. Turbay Quintero.

    CERN Multimedia

    Maximilien Brice

    2012-01-01

    1 November 2012 - Signature of the Co-operation Agreement between the Administrative Department of Science, Technology and Innovation (COLCIENCIAS) of Colombia and the European Organization for Nuclear Research (CERN) concerning Scientific and Technical Co-operation in High-Energy Physics and related technologies by CERN Director-General R. Heuer, witnessed by Ambassador of Colombia to Switzerland C. Turbay Quintero.

  6. 3 July 2007 - Ambassador A. Navarro Llanos, Permanent Representative of the Republic of Bolivia to the United Nations Office and other international organisations in Geneva signing a Co-operation Agreement concerning Scientific and Technical Co-operation in High-Energy Physics with CERN Director General R. Aymar.

    CERN Multimedia

    Maximilien Brice

    2007-01-01

    3 July 2007 - Ambassador A. Navarro Llanos, Permanent Representative of the Republic of Bolivia to the United Nations Office and other international organisations in Geneva signing a Co-operation Agreement concerning Scientific and Technical Co-operation in High-Energy Physics with CERN Director General R. Aymar.

  7. Improved PFB operations - 400-hour turbine test results

    Science.gov (United States)

    Rollbuhler, R. J.; Benford, S. M.; Zellars, G. R.

    1980-04-01

    The paper deals with a 400-hr small turbine test in the effluent of a pressurized fluidized bed (PFB) at an average temperature of 770 C, an average relative gas velocity of 300 m/sec, and average solid loadings of 200 ppm. Consideration is given to combustion parameters and operating procedure as well as to the turbine system and turbine test operating procedures. Emphasis is placed on erosion/corrosion results.

  8. Developing a testing tool for a port terminal operating system

    OpenAIRE

    Perič, Miran

    2011-01-01

    This thesis describes the approach for development of a testing tool which simulates the terminal operating system. Main result of the thesis is presentation of the approach for the development and operation of the application, which was developed in C# programming language. The application communicates with the port information system by messages exchange. Data is stored on a database. With the support of the application we can test the port information system before of future implem...

  9. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  10. W-026, health physics instrumentation operational test report

    International Nuclear Information System (INIS)

    Hackworth, M.F.

    1998-01-01

    This report documents the testing of the Health Physics Instrumentation associated with phase 2 and 3 start-up of Project W-026, WRAP. The Health Physics Instrumentation includes: Alpha and Beta Continuous Air Monitors (CAMS), Personnel Contamination Monitors (PCMs), Gamma Area Radiation Monitors (ARMs), Criticality Monitors, Alpha and Beta Smear Sample Counters, Portable Friskers, and Operator Breathing Zone Air Samplers. This OTR will cover only the Health Physics Instrumentation that was tested under the Operational test Plan for Health Physics Instrumentation (Phase 2 and 3). That instrumentation included: Alpha CAMS, Beta CAMs and ARMs located in rooms 107 and 113 of 2336-W. The remaining Health Physics Instrumentation that will be used for phase 2 and 3 start-up is tested during calibrations. These calibrations are outside the scope of the Operational Test Plan

  11. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  12. The operation of the Tokamak Fusion Test Reactor Tritium Facility

    International Nuclear Information System (INIS)

    Gentile, C.A.; LaMarche, P.H.

    1995-01-01

    The TFTR tritium operations staff has successfully received, stored, handled, and processed over five hundred thousand curies of tritium for the purpose of supporting D-T (Deuterium-Tritium) operations at TFTR. Tritium operations personnel nominally provide continuous round the clock coverage (24 hours/day, 7 days/week) in shift complements consisting of I supervisor and 3 operators. Tritium Shift Supervisors and operators are required to have 5 years of operational experience in either the nuclear or chemical industry and to become certified for their positions. The certification program provides formal instruction, as well as on the job training. The certification process requires 4 to 6 months to complete, which includes an oral board lasting up to 4 hours at which time the candidate is tested on their knowledge of Tritium Technology and TFTR Tritium systems. Once an operator is certified, the training process continues with scheduled training weeks occurring once every 5 weeks. During D-T operations at TFTR the operators must evacuate the tritium area due to direct radiation from TFTR D-T pulses. During '' time operators maintain cognizance over tritium systems via a real time TV camera system. Operators are able to gain access to the Tritium area between TFTR D-T pulses, but have been excluded from die tritium area during D-T pulsing for periods up to 30 minutes. Tritium operators are responsible for delivering tritium gas to TFRR as well as processing plasma exhaust gases which lead to the deposition of tritium oxide on disposable molecular sieve beds (DMSB). Once a DMSB is loaded, the operations staff remove the expended DMSB, and replace it with a new DMSB container. The TFIR tritium system is operated via detailed procedures which require operator sign off for system manipulation. There are >300 procedures controlling the operation of the tritium systems

  13. Operability test procedure for 244-U DCRT. Revision 1

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    This OPT will insure the operability of various systems and their general equipment, used in the operation of the 244-U DCRT. Systems that will be tested include the following: Leak Detection Systems; Heat Trace System; Vessel Temperature Measurement System; Dip Tube Water System; Weight Factor and Specific Gravity System; Instrument Air System; Vessel Liquid Level System; Vessel Liquid Transfer System; and Exhauster Differential Pressure Indicating Controller System. The tests will cover checks on equipment operation and electrical interlocks, but will not cover checks on associated annunciator alarms which are covered in a separate OTP

  14. Operational test procedure for Bldg 241-A-701 air compressor

    International Nuclear Information System (INIS)

    Desantis, G.N.

    1995-01-01

    This document is an Operability Test Procedure (OTP) which will verify and record that the 241-A-701 air compressor and associated equipment operates within their intended design parameters. The activities defined in this OTP will be performed to ensure the daily operation of the new compressed air system can be reliable and efficient. The Compressed Air System (CAS) for 241-A-701 supplies process and instrument air to the A, AX, AY, and AZ tank farms. The primary use of the CAS is for tank farms instrumentation, air operated valves, and air lift circulators

  15. Artificial intelligence in a mission operations and satellite test environment

    Science.gov (United States)

    Busse, Carl

    1988-01-01

    A Generic Mission Operations System using Expert System technology to demonstrate the potential of Artificial Intelligence (AI) automated monitor and control functions in a Mission Operations and Satellite Test environment will be developed at the National Aeronautics and Space Administration (NASA) Jet Propulsion Laboratory (JPL). Expert system techniques in a real time operation environment are being studied and applied to science and engineering data processing. Advanced decommutation schemes and intelligent display technology will be examined to develop imaginative improvements in rapid interpretation and distribution of information. The Generic Payload Operations Control Center (GPOCC) will demonstrate improved data handling accuracy, flexibility, and responsiveness in a complex mission environment. The ultimate goal is to automate repetitious mission operations, instrument, and satellite test functions by the applications of expert system technology and artificial intelligence resources and to enhance the level of man-machine sophistication.

  16. Cryogenic testing and analysis associated with Tevatron lower temperature operation

    International Nuclear Information System (INIS)

    Theilacker, J.C.

    1996-01-01

    An upgrade of the Tevatron cryogenic system was installed and commissioned in 1993 to allow lower temperature operation. As a result, higher energy operation of the Fermilab superconducting Tevatron accelerator is possible. Following the installation and initial commissioning, it was decided to continue the current colliding beam physics run at the previous energy of 900 GeV. This has allowed the author to perform parasitic lower temperature tests in the Tevatron over the last year and a half. This paper presents the results of operational experiences and thermal and hydraulic testing which have taken place. The primary goal of the testing is to better understand the operation of the cold compressor system, associated instrumentation, and the performance of the existing magnet system during lower temperature operation. This will lead to a tentatively scheduled higher energy test run in the fall of 1995. The test results have shown that more elaborate controlling methods are necessary in order to achieve reliable system operation. Fortunately, the new satellite refrigerator controls system is capable of the expansion necessary to reach this goal. New features are being added to the controls systems which will allow for more intelligent control and better diagnostics for component monitoring and trending

  17. Cryogenic testing and analysis associated with Tevatron lower temperature operation

    International Nuclear Information System (INIS)

    Theilacker, J.C.

    1996-09-01

    An upgrade of the Tevatron cryogenic system was installed and commissioned in 1993 to allow lower temperature operation. As a result, higher energy operation is possible. Following the installation and initial commissioning, it was decided to continue the current colliding beam physics at the previous energy of 900 GeV. This has allowed us to perform parasitic lower temperature tests in the Tevatron over the last year and a half. This paper presents the results of operational experiences and thermal and hydraulic testing which has taken place. The primary goal of the testing is to better understand the operation of the cold compressor system, associated instrumentation, and the performance of the existing magnet system during lower temperature operation. This will lead to a tentatively scheduled higher energy test run in the fall of 1995. The test results have shown that more elaborate controlling methods are necessary in order to achieve reliable system operation. Fortunately, our new satellite refrigerator controls system is capable of the expansion necessary to reach our goal. New features are being added to the control system which will allow for more intelligent control and better diagnostics for component monitoring and trending

  18. Durability Tests of Ball Valve Prototype with Flowmeter Operation

    Science.gov (United States)

    Rogula, J.; Romanik, G.

    2018-02-01

    The results of the investigation of the prototypical ball valve are presented in this article. The innovation of the tested valve is a ball with a built-in measuring orifice. The valve has been subjected to durability tests. Leakage under three temperatures: ambient, -30°C and +100°C was analyzed. Sealing elements of the valve were tested for roughness and deviation of shape before and after the cycles of operation. Ball valve operation means cycles of open/close. It was planned to perform 1000 cycles at each temperature condition accordingly. Tests of the valve were performed under gas pressure equal to 10 MPa. The research was carried out under the Operational Program "Intelligent Development" (POIR 01.01.01-00-0013 / 15 "Development of devices for measurement of media flow on industrial trunk-lines".

  19. Automated particulate sampler field test model operations guide

    Energy Technology Data Exchange (ETDEWEB)

    Bowyer, S.M.; Miley, H.S.

    1996-10-01

    The Automated Particulate Sampler Field Test Model Operations Guide is a collection of documents which provides a complete picture of the Automated Particulate Sampler (APS) and the Field Test in which it was evaluated. The Pacific Northwest National Laboratory (PNNL) Automated Particulate Sampler was developed for the purpose of radionuclide particulate monitoring for use under the Comprehensive Test Ban Treaty (CTBT). Its design was directed by anticipated requirements of small size, low power consumption, low noise level, fully automatic operation, and most predominantly the sensitivity requirements of the Conference on Disarmament Working Paper 224 (CDWP224). This guide is intended to serve as both a reference document for the APS and to provide detailed instructions on how to operate the sampler. This document provides a complete description of the APS Field Test Model and all the activity related to its evaluation and progression.

  20. Director`s series on proliferation

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, K.C.; Price, M.E. [eds.

    1994-12-27

    The Director`s Series on Proliferation is an occasional publication of essays on the topics of nuclear, chemical, biological, and missile proliferation. The seven papers presented in this issue cover the following topics: Should the Treaty on the Nonproliferation of Nuclear Weapons (NPT) be amended?; NPT extension - Legal and procedural issues; An Indonesian view of NPT review conference issues; The treaty of Tlatelolco and the NPT - Tools for peace and development; Perspectives on cut-off, weapons dismantlement, and security assurances; Belarus and NPT challenges; A perspective on the chemical weapons convention - Lessons learned from the preparatory commission.

  1. Leader in Digital Transformation: Director, Information Management ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    As the Deputy Chief Information Officer, the Director is also accountable for developing ... operations and maintenance of key business systems (financial applications, ... Plays a key role in the control of access to personal information in e-mail ...

  2. Motor-operated valve (MOV) actuator motor and gearbox testing

    International Nuclear Information System (INIS)

    DeWall, K.; Watkins, J.C.; Bramwell, D.

    1997-07-01

    Researchers at the Idaho National Engineering and Environmental Laboratory tested the performance of electric motors and actuator gearboxes typical of the equipment installed on motor-operated valves used in nuclear power plants. Using a test stand that simulates valve closure loads against flow and pressure, the authors tested five electric motors (four ac and one dc) and three gearboxes at conditions a motor might experience in a power plant, including such off-normal conditions as operation at high temperature and reduced voltage. They also monitored the efficiency of the actuator gearbox. All five motors operated at or above their rated starting torque during tests at normal voltages and temperatures. For all five motors, actual torque losses due to voltage degradation were greater than the losses calculated by methods typically used for predicting motor torque at degraded voltage conditions. For the dc motor the actual torque losses due to elevated operating temperatures were greater than the losses calculated by the typical predictive method. The actual efficiencies of the actuator gearboxes were generally lower than the running efficiencies published by the manufacturer and were generally nearer the published pull-out efficiencies. Operation of the gearbox at elevated temperature did not affect the operating efficiency

  3. Prediction of software operational reliability using testing environment factor

    International Nuclear Information System (INIS)

    Jung, Hoan Sung

    1995-02-01

    Software reliability is especially important to customers these days. The need to quantify software reliability of safety-critical systems has been received very special attention and the reliability is rated as one of software's most important attributes. Since the software is an intellectual product of human activity and since it is logically complex, the failures are inevitable. No standard models have been established to prove the correctness and to estimate the reliability of software systems by analysis and/or testing. For many years, many researches have focused on the quantification of software reliability and there are many models developed to quantify software reliability. Most software reliability models estimate the reliability with the failure data collected during the test assuming that the test environments well represent the operation profile. User's interest is on the operational reliability rather than on the test reliability, however. The experiences show that the operational reliability is higher than the test reliability. With the assumption that the difference in reliability results from the change of environment, testing environment factor comprising the aging factor and the coverage factor are defined in this work to predict the ultimate operational reliability with the failure data. It is by incorporating test environments applied beyond the operational profile into testing environment factor Test reliability can also be estimated with this approach without any model change. The application results are close to the actual data. The approach used in this thesis is expected to be applicable to ultra high reliable software systems that are used in nuclear power plants, airplanes, and other safety-critical applications

  4. SUPERCONDUCTING RADIO-FREQUENCY MODULES TEST FACILITY OPERATING EXPERIENCE

    International Nuclear Information System (INIS)

    Soyars, W.; Bossert, R.; Darve, C.; Degraff, B.; Klebaner, A.; Martinez, A.; Pei, L.; Theilacker, J.

    2008-01-01

    Fermilab is heavily engaged and making strong technical contributions to the superconducting radio-frequency research and development program (SRF R and D). Four major SRF test areas are being constructed to enable vertical and horizontal cavity testing, as well as cryomodule testing. The existing Fermilab cryogenic infrastructure has been modified to service the SRF R and D needs. The project's first stage has been successfully completed, which allows for distribution of cryogens for a single-cavity cryomodule using the existing Cryogenic Test Facility (CTF) that houses three Tevatron satellite refrigerators. The cooling capacity available for cryomodule testing at Meson Detector Building (MDB) results from the liquefaction capacity of the CTF cryogenic system. The cryogenic system for a single 9-cell cryomodule is currently operational. The paper describes the status, challenges and operational experience of the initial phase of the project

  5. LHC Magnet Tests Operational Techniques and Empowerment for Successful Completion

    CERN Document Server

    Chohan, V; Priestnall, K; Pirotte, F; Veyrunes, E; Ali, N; Awale, P; Bahuguna, S; Bhunia, U; Chauhan, V; Dixit, M; Gore, J; John, J; Kandaswamy, E; Kasbekar, A; Kashyap, P; Kasliwal, A; Kulkarni, C; Laddha, A; Malhotra, S; Mascarenhas, M; Mishra, J; Motiwala, P; Nair, K; Narayanan, R; Padmakumar, S; Pagare, A; Peruppayikkad, D; Raghunathan, S; Rao, S; Roy, D; Sharma, S; Shimjith, S; Singh, S; Sonnis, S; Sridhar, S; Surendran, P; Tikaria, A

    2007-01-01

    The LHC magnet tests operation team developed various innovative techniques, particularly since early 2004, to complete the superconductor magnet tests by Feb. 2007. Overall and cryogenic priority handling, rapid on-bench thermal cycling, rule-based goodness evaluation on round-the-clock basis, multiple, mashed web systems are some of these techniques applied with rigour for successful tests completion in time. This paper highlights these operation empowerment tools which had a pivotal role for success. A priority handling method was put in place to enable maximum throughput from twelve test benches, having many different constraints. For the cryogenics infrastructure, it implied judicious allocation of limited resources to the benches. Rapid On-Bench Thermal Cycle was a key strategy to accelerate magnets tests throughput, saving time and simplifying logistics. First level magnet appraisal was developed for 24 hr decision making so as to prepare a magnet further for LHC or keep it on standby. Web based system...

  6. Operation for LHC Cryomagnet Tests Concerns, Challenges & Successful Collaboration

    CERN Document Server

    Chohan, V

    2007-01-01

    The LHC construction phase is coming to a close, with installation work progressing rapidly and beam start-up foreseen by end 2007. For the testing of the 1706 LHC cryomagnets in cryogenic conditions and its successful completion by early 2007, considerable challenges had to be overcome since 2002 to assure certain semi-routine tests operation at CERN. In particular, the majority of staff for tests and measurement purposes was provided by India on a rotating, one-year-stay basis, as part of the CERN-India Collaboration for LHC. This was complemented by some CERN accelerator Operation staff. While only 95 dipoles were tested till 2003, the efforts and innovative ideas coming from the Operation team contributed significantly to the completion of tests of nearly all 1706 magnets by end-2006. These included the improvements and management of the tests work flow as well as the test rates. Amongst these, certain pivotal ideas to stream-line the tests methodology as proposed and implemented successfully by the India...

  7. Commissioning and operation of the horizontal test apparatus at SNS

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sang-Ho [ORNL; Neustadt, Thomas S. [ORNL; Howell, Matthew P. [ORNL; Hannah, Brian S. [ORNL; Doleans, Marc [ORNL; Saunders, Jeffrey W. [ORNL

    2015-07-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Lab (ORNL) has built, commissioned and operated a Horizontal Test Apparatus (HTA) vessel in the Radiofrequency Test Facility (RFTF) test cave. It can be operated at 4.5 K using the independent Cryogenic Test Facility (CTF). The HTA is designed to be a single cavity version of an SNS cryomodule with the ability to demount and replace the cavity. It provides the functionality for testing a single dressed SNS medium or high beta Superconducting Radiofrequency (SRF) cavity. The HTA is currently being used in support of R&D for in-situ plasma processing of the cavity's inner niobium surface. The design and commissioning of the HTA at 4.5 K will be presented as well as results from operating the HTA including cool-down, warm-up and steady state operations. Results from plasma processing a warm SCRF cavity in-between cold HTA tests will also be reported.

  8. Residual energy applications program test and operations report

    International Nuclear Information System (INIS)

    Zander, F.H.

    1980-10-01

    Objective of REAP in the recovery of waste heat at US gaseous diffusion plants by 1984. This report contains policy, objective, and guideline suggestions for utilizing the proposed Energy applied Systems Test (EAST) Facility and for managing EAST operations; preliminary design information on facility support equipment and physical plant; and estimates of initial construction costs and staffing requirements for a two-bay, three-shift operation

  9. Current operations and experiments at the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Bartlit, J.R.; Anderson, J.L.

    1985-01-01

    The Tritium Systems Test Assembly (TSTA) has continued to move toward operation of a fully-integrated, full-sized, computer-controlled fusion fuel processing loop. Concurrent, nonloop experiments have answered important questions on new components and issues such as palladium diffusion membranes, ceramic electrolysis cells, regenerable tritium getters, laser Raman spectroscopy, unregenerable tritium inventory on molecular sieves, tritium contamination problems and decontamination methods, and operating data on reliability, emissions, doses, and wastes generated. 4 refs., 2 figs

  10. The electron test accelerator safety in design and operation

    International Nuclear Information System (INIS)

    McKeown, J.

    1980-06-01

    The Electron Test Accelerator is being designed as an experiment in accelerator physics and technology. With an electron beam power of up to 200 kW the operation of the accelerator presents a severe radiation hazard as well as rf and electrical hazards. The design of the safety system provides fail-safe protection while permitting flexibility in the mode of operation and minimizing administrative controls. (auth)

  11. Operation UPSHOT-KNOTHOLE. Report to the Test Director Aircraft Participation, Nevada Proving Grounds, March-June 1953

    Science.gov (United States)

    1982-06-04

    C b «> "a 4-t CO § » I . _a-S .^ v« •<-4 3 M ta M « -S v e a e -n b •s * s , .„ ^ £ « £ 5 5 H I o o I toco TT...Decontamination uaed after first reading, natural decay. 106 »0,000 toco i 5 S »00 «0 1 1 I I I lllj 1 TTTTTm NATURAL OCCAV i i

  12. The operator interface for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Lang, N.C.

    1986-12-01

    The uncertain and most likely changing nature of a large experimental facility like MFTF, as well as its large number of control and monitor points, ruled against the traditional hardware approach involving walls of knobs, dials, oscilloscopes, and strip chart recorders. Rather, from the beginning, project management specified computer control of all systems, and operation of the complete MFTF under an integrated computer control system became a major engineering goal. The Integrated Controls and Diagnostics (ICADS) group was charged with the design and implementation of this control system. We designed a control system with an extremely flexible operator interface which uses computer generated CRT displays for output and pointing devices such as touch sensitive CRT overlays, mice, and joysticks for input. Construction of MFTF was completed at the end of 1985 within the project budget of $241.6M and was followed immediately by a 5 month long acceptance test. During this period (known as PACE test) operators, engineers, and physicists successfully used our computer control system daily to test MFTF. Much of their willingness to forsake the traditional hands-on hardware approach to testing was a result of the powerful and flexible operator interface to the MFTF control system. In this paper, we describe the operator interface with emphasis on the displays, the touch screens, and the mouse. We also report the experiences of users and, in particular, stress those aspects of the user interface they strongly liked and disliked

  13. Importance Of Penetration Testing For Legacy Operating System

    Directory of Open Access Journals (Sweden)

    Poorvi Bhatt

    2017-12-01

    Full Text Available Penetration testing is very important technique to find vulnerabilities in commercial networks. There are various techniques for ethical hacking via penetration testing. This report explains a white hat hacker approach of penetration testing. I have performed this test on private network where three PCs are connected through LAN via switch and without firewall. This network is not connected with Internet. All the PCs have windows operating system. The attacker host has windows server 2003 with Service Pack1 second host has windows XP with Service Pack 2 and third host has windows 2000 with service pack 4.

  14. Prediction of safety critical software operational reliability from test reliability using testing environment factors

    International Nuclear Information System (INIS)

    Jung, Hoan Sung; Seong, Poong Hyun

    1999-01-01

    It has been a critical issue to predict the safety critical software reliability in nuclear engineering area. For many years, many researches have focused on the quantification of software reliability and there have been many models developed to quantify software reliability. Most software reliability models estimate the reliability with the failure data collected during the test assuming that the test environments well represent the operation profile. User's interest is however on the operational reliability rather than on the test reliability. The experiences show that the operational reliability is higher than the test reliability. With the assumption that the difference in reliability results from the change of environment, from testing to operation, testing environment factors comprising the aging factor and the coverage factor are developed in this paper and used to predict the ultimate operational reliability with the failure data in testing phase. It is by incorporating test environments applied beyond the operational profile into testing environment factors. The application results show that the proposed method can estimate the operational reliability accurately. (Author). 14 refs., 1 tab., 1 fig

  15. Operability test procedure for PFP wastewater sampling facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    Document provides instructions for performing the Operability Test of the 225-WC Wastewater Sampling Station which monitors the discharge to the Treated Effluent Disposal Facility from the Plutonium Finishing Plant. This Operability Test Procedure (OTP) has been prepared to verify correct configuration and performance of the PFP Wastewater sampling system installed in Building 225-WC located outside the perimeter fence southeast of the Plutonium Finishing Plant (PFP). The objective of this test is to ensure the equipment in the sampling facility operates in a safe and reliable manner. The sampler consists of two Manning Model S-5000 units which are rate controlled by the Milltronics Ultrasonic flowmeter at manhole No.C4 and from a pH measuring system with the sensor in the stream adjacent to the sample point. The intent of the dual sampling system is to utilize one unit to sample continuously at a rate proportional to the wastewater flow rate so that the aggregate tests are related to the overall flow and thereby eliminate isolated analyses. The second unit will only operate during a high or low pH excursion of the stream (hence the need for a pH control). The major items in this OTP include testing of the Manning Sampler System and associated equipment including the pH measuring and control system, the conductivity monitor, and the flow meter

  16. Application of artificial intelligence to motor operated valve testing

    International Nuclear Information System (INIS)

    Bogard, T.; Bednar, F.; Matty, T.; Kent, R.

    1989-01-01

    Improper valve maintenance can be a significant roadblock to successful power plant operation. There have been events during which motor operated valves failed on demand due to improper switch settings. For nuclear electric generating stations, these events have led to regulatory requirements such as NRC Bulletin 85-03 and NRC Bulletin 89-10 Safety Related Motor Operated Valve Testing and Surveillance which imposes strict testing and programmatic requirements on motor operated valves (MOV). Part of the requirements include performing diagnostic testing to verify stem thrust loads and switch settings. Diagnostic equipment must be non-intrusive, minimize valve disassembly, and reduce plant refueling critical path time for testing. In this paper an on-line diagnostic system using sensors to measure stem forces, motor current, and valve position, and a portable system employing these same sensor inputs in addition to torque, limit and torque bypass switch inputs is described. Sophisticated graphic software is employed to display data or trace information. A rule based artificial intelligence (AI) system is used to analyze sensor outputs. Objectives for valve diagnostics, sample AI rules, results of actual field testing, and system software/hardware architecture are presented

  17. Defense waste management operations at the Nevada Test Site

    International Nuclear Information System (INIS)

    Williams, R.E.; Kendall, E.W.

    1988-01-01

    Waste management activities were initiated at the Nevada Test Site (NTS) to dispose of low-level wastes (LLW) produced by the Department of Energy's (DOE's) weapons testing program. Disposal activities have expanded from the burial of atmospheric weapons testing debris to demonstration facilities for greater-than-Class-C (GTCC) waste, transuranic (TRU) waste storage and certification, and the development of a mixed waste (MW) facility. Site specific operational research projects support technology development required for the various disposal facilities. The annual cost of managing the facilities is about $6 million depending on waste volumes and types. The paper discusses site selection; establishment of the Radioactive Waste Management Project; operations with respect to low-level radioactive wastes, transuranic waste storage, greater confinement disposal test, and mixed waste management facility; and related research activities such as tritium migration studies, revegetation studies, and in-situ monitoring of organics

  18. Utilization of test boreholes in prospecting and mining operations

    International Nuclear Information System (INIS)

    Sierak, J.P.

    1987-01-01

    Test boreholes are of fundamental importance for mining and prospecting operations. The drilling techniques are suited to the geological conditions and to the nature of the information desired. At Cogema, non-coring test boreholes, mainly drilled by a rotary percussive method, represent over 90% of the footage drilled; they achieve impressive performances at a cost which is by far less than that of coring test boreholes. The geological exploitation of these test boreholes is effected by a combined investigation of well logging and of cuttings. These investigations lead to an assessment for certain substances like uranium or coal or they mark the limits for favourable zones which alone will form the object of coring boreholes. In mining operations, boreholes indicate the definition for workable panels; they ensure at less cost the distribution of fluids, the forwarding of stowing material and the mine ventilation [fr

  19. Heartfelt Empathy? No Association between Interoceptive Awareness, Questionnaire Measures of Empathy, Reading the Mind in the Eyes test or the Director Task.

    Directory of Open Access Journals (Sweden)

    Vivien eAinley

    2015-05-01

    Full Text Available Interoception, defined as afferent information arising from within the body, is the basis of all emotional experience and underpins the ‘self’. However, people vary in the extent to which interoceptive signals reach awareness. This trait modulates both their experience of emotion and their ability to distinguish ‘self’ from ‘other’ in multisensory contexts. The experience of emotion and the degree of self/other distinction or overlap are similarly fundamental to empathy, which is an umbrella term comprising affect sharing, empathic concern and perspective-taking. A link has therefore often been assumed between interoceptive awareness and empathy despite a lack of clear evidence. To test the hypothesis that individual differences in both traits should correlate, we measured interoceptive awareness in four experiments, using a well-validated heartbeat perception task, and compared this with scores on several tests that relate to various aspects of empathy. We firstly measured scores on the Index of Interpersonal Reactivity and secondly on the Questionnaire of Cognitive and Affective Empathy. Thirdly, because the ‘simulationist’ account assumes that affect sharing is involved in recognising emotion, we employed the ‘Reading the Mind in the Eyes Task’ for the recognition of facial expressions. Contrary to expectation, we found no significant relationships between interoceptive awareness and any aspect of these measures. This striking lack of direct links has important consequences for hypotheses about the extent to which empathy is necessarily embodied. Finally, to assess cognitive perspective-taking ability, which specifically requires self/other distinction, we used the ‘Director Task’ but found no relationship. We conclude that the abilities that make up empathy are potentially related to interoceptive awareness in a variety of conflicting ways, such that a direct association between interoceptive awareness and various

  20. Aquifer test plan for the 100-HR-3 Operable Unit

    International Nuclear Information System (INIS)

    Swanson, L.C.; Hartman, M.J.

    1994-01-01

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues

  1. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  2. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  3. Pilot plant UF6 to UF4 test operations report

    International Nuclear Information System (INIS)

    Bicha, W.J.; Fallings, M.; Gilbert, D.D.; Koch, G.E.; Levine, P.J.; McLaughlin, D.F.; Nuhfer, K.R.; Reese, J.C.

    1987-02-01

    The FMPC site includes a plant designed for the reduction of uranium hexafluoride (UF 6 ) to uranium tetrafluoride (UF 4 ). Limited operation of the upgraded reduction facility began in August 1984 and continued through January 19, 1986. A reaction vessel ruptured on that date causing the plant operation to be shut down. The DOE conducted a Class B investigation with the findings of the investigation board issued in preliminary form in May 1986 and as a final recommendation in July 1986. A two-phase restart of the plant was planned and implemented. Phase I included implementing safety system modifications, changing reaction vessel temperature control strategy, and operating the reduction plant under an 8-week controlled test. The results of the test period are the subject of this report. 41 figs., 11 tabs

  4. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  5. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  6. Radioactive acid digestion test unit nonradioactive startup operations

    International Nuclear Information System (INIS)

    Allen, C.R.; Cowan, R.G.; Crippen, M.D.; Divine, J.R.

    1978-05-01

    The Radioactive Acid Digestion Test Unit (RADTU) will process 5 kg/hour of combustible solid waste and is designed to handle almost all solid combustible waste found in plutonium processing with plutonium contamination levels up to scrap. The RADTU is designed with special safety features to safely contain high masses of fissile materials and to safely handle unusual materials and reactive chemicals which may find their way into the waste. Nonradioactive operating experience to date has been very satisfactory. RADTU has been operated for extended runs on both a 24-hour per day basis as well as on a one shift per day basis. Some minor operating problems have been encountered as expected in a shakedown operation. In general, solutions to these have been readily found. 12 figures

  7. Operating experience with superconducting cavities at the TESLA test facility

    International Nuclear Information System (INIS)

    Moeller, Wolf-Dietrich

    2003-01-01

    A description of the TESLA Test Facility, which has been set up at DESY by the TeV Energy Superconducting Accelerator (TESLA) collaboration, will be given as it is now after five years of installation and operation. The experience with the first three modules, each containing 8 superconducting 9-cell cavities, installed and operated in the TTF-linac will be described. The measurements in the vertical and horizontal cryostats as well as in the modules will be compared. Recent results of the operation at the TESLA design current, macropulses of 800 μsec with bunches of 3.2 nC at a rate of 2.25 MHz are given. New measurement results of the higher order modes (HOM) will be presented. The operation and optimisation of the TTF Free Electron Laser (TTF-FEL) will also be covered in this paper. (author)

  8. Defense waste management operations at the Nevada Test Site

    International Nuclear Information System (INIS)

    Williams, R.E.; Kendall, E.W.

    1988-01-01

    Waste management activities were initiated at the Nevada Test Site (NTS) to dispose of low-level wastes (LLW) produced by the Department of Energy's (DOE's) weapons testing program. Disposal activities have expanded from the burial of atmospheric weapons testing debris to demonstration facilities for greater-than-Class C (GTCC) waste, transuranic (TRU) waste storage and certification, and the development of a mixed waste (MW) facility. Site specific operational research projects support technology development required for the various disposal facilities. The annual cost of managing the facilities is about $6 million depending on waste volumes and types

  9. Using Operational Analysis to Improve Access to Pulmonary Function Testing

    Directory of Open Access Journals (Sweden)

    Ada Ip

    2016-01-01

    Full Text Available Background. Timely pulmonary function testing is crucial to improving diagnosis and treatment of pulmonary diseases. Perceptions of poor access at an academic pulmonary function laboratory prompted analysis of system demand and capacity to identify factors contributing to poor access. Methods. Surveys and interviews identified stakeholder perspectives on operational processes and access challenges. Retrospective data on testing demand and resource capacity was analyzed to understand utilization of testing resources. Results. Qualitative analysis demonstrated that stakeholder groups had discrepant views on access and capacity in the laboratory. Mean daily resource utilization was 0.64 (SD 0.15, with monthly average utilization consistently less than 0.75. Reserved testing slots for subspecialty clinics were poorly utilized, leaving many testing slots unfilled. When subspecialty demand exceeded number of reserved slots, there was sufficient capacity in the pulmonary function schedule to accommodate added demand. Findings were shared with stakeholders and influenced scheduling process improvements. Conclusion. This study highlights the importance of operational data to identify causes of poor access, guide system decision-making, and determine effects of improvement initiatives in a variety of healthcare settings. Importantly, simple operational analysis can help to improve efficiency of health systems with little or no added financial investment.

  10. Case Management Directors

    Science.gov (United States)

    Bankston White, Cheri; Birmingham, Jackie

    2015-01-01

    Purpose and Objectives: Case management directors are in a dynamic position to affect the transition of care of patients across the continuum, work with all levels of providers, and support the financial well-being of a hospital. Most importantly, they can drive good patient outcomes. Although the position is critical on many different levels, there is little to help guide a new director in attending to all the “moving parts” of such a complex role. This is Part 2 of a two-part article written for case management directors, particularly new ones. Part 1 covered the first 4 of 7 tracks: (1) Staffing and Human Resources, (2) Compliance and Accreditation, (3) Discharge Planning and (4) Utilization Review and Revenue Cycle. Part 2 addresses (5) Internal Departmental Relationships (Organizational), (6) External Relationships (Community Agency), and (7) Quality and Program Outcomes. This article attempts to answer the following questions: Are case management directors prepared for an expanded role that affects departments and organizations outside of their own?How does a case management director manage the transition of care of patients while managing required relationships outside the department?How does the director manage program outcomes in such a complex department? Primary Practice Setting: The information is most meaningful to those case management directors who work in either stand-alone hospitals or integrated health systems and have frontline case managers (CMs) reporting to them. Findings/Conclusions: Part 1 found that case management directors would benefit from further research and documentation of “best practices” related to their role, particularly in the areas of leadership and management. The same conclusion applies to Part 2, which addresses the director's responsibilities outside her immediate department. Leadership and management skills apply as well to building strong, productive relationships across a broad spectrum of external organizations

  11. A test harness for accelerating physics parameterization advancements into operations

    Science.gov (United States)

    Firl, G. J.; Bernardet, L.; Harrold, M.; Henderson, J.; Wolff, J.; Zhang, M.

    2017-12-01

    The process of transitioning advances in parameterization of sub-grid scale processes from initial idea to implementation is often much quicker than the transition from implementation to use in an operational setting. After all, considerable work must be undertaken by operational centers to fully test, evaluate, and implement new physics. The process is complicated by the scarcity of like-to-like comparisons, availability of HPC resources, and the ``tuning problem" whereby advances in physics schemes are difficult to properly evaluate without first undertaking the expensive and time-consuming process of tuning to other schemes within a suite. To address this process shortcoming, the Global Model TestBed (GMTB), supported by the NWS NGGPS project and undertaken by the Developmental Testbed Center, has developed a physics test harness. It implements the concept of hierarchical testing, where the same code can be tested in model configurations of varying complexity from single column models (SCM) to fully coupled, cycled global simulations. Developers and users may choose at which level of complexity to engage. Several components of the physics test harness have been implemented, including a SCM and an end-to-end workflow that expands upon the one used at NOAA/EMC to run the GFS operationally, although the testbed components will necessarily morph to coincide with changes to the operational configuration (FV3-GFS). A standard, relatively user-friendly interface known as the Interoperable Physics Driver (IPD) is available for physics developers to connect their codes. This prerequisite exercise allows access to the testbed tools and removes a technical hurdle for potential inclusion into the Common Community Physics Package (CCPP). The testbed offers users the opportunity to conduct like-to-like comparisons between the operational physics suite and new development as well as among multiple developments. GMTB staff have demonstrated use of the testbed through a

  12. Cassini's Test Methodology for Flight Software Verification and Operations

    Science.gov (United States)

    Wang, Eric; Brown, Jay

    2007-01-01

    The Cassini spacecraft was launched on 15 October 1997 on a Titan IV-B launch vehicle. The spacecraft is comprised of various subsystems, including the Attitude and Articulation Control Subsystem (AACS). The AACS Flight Software (FSW) and its development has been an ongoing effort, from the design, development and finally operations. As planned, major modifications to certain FSW functions were designed, tested, verified and uploaded during the cruise phase of the mission. Each flight software upload involved extensive verification testing. A standardized FSW testing methodology was used to verify the integrity of the flight software. This paper summarizes the flight software testing methodology used for verifying FSW from pre-launch through the prime mission, with an emphasis on flight experience testing during the first 2.5 years of the prime mission (July 2004 through January 2007).

  13. 27 Febuary 2012 - US DoE Associate Director of Science for High Energy Physics J. Siegrist visiting the LHC superconducting magnet test hall with adviser J.-P. Koutchouk and engineer M. Bajko; in CMS experimental cavern with Spokesperson J. Incadela;in ATLAS experimental cavern with Deputy Spokesperson A. Lankford; in ALICE experimental cavern with Spokesperson P. Giubellino; signing the guest book with Director for Accelerators and Technology S. Myers.

    CERN Multimedia

    Laurent Egli

    2012-01-01

    27 Febuary 2012 - US DoE Associate Director of Science for High Energy Physics J. Siegrist visiting the LHC superconducting magnet test hall with adviser J.-P. Koutchouk and engineer M. Bajko; in CMS experimental cavern with Spokesperson J. Incadela;in ATLAS experimental cavern with Deputy Spokesperson A. Lankford; in ALICE experimental cavern with Spokesperson P. Giubellino; signing the guest book with Director for Accelerators and Technology S. Myers.

  14. Operational test report - Project W-320 cathodic protection systems

    International Nuclear Information System (INIS)

    Bowman, T.J.

    1998-01-01

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems

  15. The ITER Neutral Beam Test Facility towards SPIDER operation

    Science.gov (United States)

    Toigo, V.; Dal Bello, S.; Gaio, E.; Luchetta, A.; Pasqualotto, R.; Zaccaria, P.; Bigi, M.; Chitarin, G.; Marcuzzi, D.; Pomaro, N.; Serianni, G.; Agostinetti, P.; Agostini, M.; Antoni, V.; Aprile, D.; Baltador, C.; Barbisan, M.; Battistella, M.; Boldrin, M.; Brombin, M.; Dalla Palma, M.; De Lorenzi, A.; Delogu, R.; De Muri, M.; Fellin, F.; Ferro, A.; Gambetta, G.; Grando, L.; Jain, P.; Maistrello, A.; Manduchi, G.; Marconato, N.; Pavei, M.; Peruzzo, S.; Pilan, N.; Pimazzoni, A.; Piovan, R.; Recchia, M.; Rizzolo, A.; Sartori, E.; Siragusa, M.; Spada, E.; Spagnolo, S.; Spolaore, M.; Taliercio, C.; Valente, M.; Veltri, P.; Zamengo, A.; Zaniol, B.; Zanotto, L.; Zaupa, M.; Boilson, D.; Graceffa, J.; Svensson, L.; Schunke, B.; Decamps, H.; Urbani, M.; Kushwah, M.; Chareyre, J.; Singh, M.; Bonicelli, T.; Agarici, G.; Garbuglia, A.; Masiello, A.; Paolucci, F.; Simon, M.; Bailly-Maitre, L.; Bragulat, E.; Gomez, G.; Gutierrez, D.; Mico, G.; Moreno, J.-F.; Pilard, V.; Chakraborty, A.; Baruah, U.; Rotti, C.; Patel, H.; Nagaraju, M. V.; Singh, N. P.; Patel, A.; Dhola, H.; Raval, B.; Fantz, U.; Fröschle, M.; Heinemann, B.; Kraus, W.; Nocentini, R.; Riedl, R.; Schiesko, L.; Wimmer, C.; Wünderlich, D.; Cavenago, M.; Croci, G.; Gorini, G.; Rebai, M.; Muraro, A.; Tardocchi, M.; Hemsworth, R.

    2017-08-01

    SPIDER is one of two projects of the ITER Neutral Beam Test Facility under construction in Padova, Italy, at the Consorzio RFX premises. It will have a 100 keV beam source with a full-size prototype of the radiofrequency ion source for the ITER neutral beam injector (NBI) and also, similar to the ITER diagnostic neutral beam, it is designed to operate with a pulse length of up to 3600 s, featuring an ITER-like magnetic filter field configuration (for high extraction of negative ions) and caesium oven (for high production of negative ions) layout as well as a wide set of diagnostics. These features will allow a reproduction of the ion source operation in ITER, which cannot be done in any other existing test facility. SPIDER realization is well advanced and the first operation is expected at the beginning of 2018, with the mission of achieving the ITER heating and diagnostic NBI ion source requirements and of improving its performance in terms of reliability and availability. This paper mainly focuses on the preparation of the first SPIDER operations—integration and testing of SPIDER components, completion and implementation of diagnostics and control and formulation of operation and research plan, based on a staged strategy.

  16. ESCRIME: testing bench for advanced operator workstations in future plants

    International Nuclear Information System (INIS)

    Poujol, A.; Papin, B.

    1994-01-01

    The problem of optimal task allocation between man and computer for the operation of nuclear power plants is of major concern for the design of future plants. As the increased level of automation induces the modification of the tasks actually devoted to the operator in the control room, it is very important to anticipate these consequences at the plant design stage. The improvement of man machine cooperation is expected to play a major role in minimizing the impact of human errors on plant safety. The CEA has launched a research program concerning the evolution of the plant operation in order to optimize the efficiency of the human/computer systems for a better safety. The objective of this program is to evaluate different modalities of man-machine share of tasks, in a representative context. It relies strongly upon the development of a specific testing facility, the ESCRIME work bench, which is presented in this paper. It consists of an EDF 1300MWe PWR plant simulator connected to an operator workstation. The plant simulator model presents at a significant level of details the instrumentation and control of the plant and the main connected circuits. The operator interface is based on the generalization of the use of interactive graphic displays, and is intended to be consistent to the tasks to be performed by the operator. The functional architecture of the workstation is modular, so that different cooperation mechanisms can be implemented within the same framework. It is based on a thorough analysis and structuration of plant control tasks, in normal as well as in accident situations. The software architecture design follows the distributed artificial intelligence approach. Cognitive agents cooperate in order to operate the process. The paper presents the basic principles and the functional architecture of the test bed and describes the steps and the present status of the program. (author)

  17. Testing Template and Testing Concept of Operations for Speaker Authentication Technology

    National Research Council Canada - National Science Library

    Sipko, Marek M

    2006-01-01

    This thesis documents the findings of developing a generic testing template and supporting concept of operations for speaker verification technology as part of the Iraqi Enrollment via Voice Authentication Project (IEVAP...

  18. Power-Cooling-Mismatch Test Series Test PCM-7. Experiment operating specifications

    International Nuclear Information System (INIS)

    Sparks, D.T.; Smith, R.H.; Stanley, C.J.

    1979-02-01

    The experiment operating specifications for the Power-Cooling-Mismatch (PCM) Test PCM-7 to be conducted in the Power Burst Facility are described. The PCM Test Series was designed on the basis of a parametric evaluation of fuel behavior response with cladding temperature, rod internal pressure, time in film boiling, and test rod power being the variable parameters. The test matrix, defined in the PCM Experiment Requirements Document (ERD), encompasses a wide range of situations extending from pre-CHF (critical heat flux) PCMs to long duration operation in stable film boiling leading to rod failure

  19. Operations plan for the Regional Seismic Test Network

    International Nuclear Information System (INIS)

    1981-01-01

    The Regional Seismic Test Network program was established to provide a capability for detection of extremely sensitive earth movements. Seismic signals from both natural and man-made earth motions will be analyzed with the ultimate objective of accurately locating underground nuclear explosions. The Sandia National Laboratories, Albuquerque, has designed an unattended seismic station capable of recording seismic information received at the location of the seismometers installed as part of that specific station. A network of stations is required to increase the capability of determining the source of the seismic signal and the location of the source. Current plans are to establish a five-station seismic network in the United States and Canada. The Department of Energy, Nevada Operations Office, has been assigned the responsibility for deploying, installing, and operating these remote stations. This Operation Plan provides the basic information and tasking to accomplish this assignment

  20. Operation of radiation monitoring system in radwaste form test facility

    International Nuclear Information System (INIS)

    Ryu, Young Gerl; Kim, Ki Hong; Lee, Jae Won; Kwac, Koung Kil

    1998-08-01

    RWFTF (RadWaste Form Test Facility) must have a secure radiation monitoring system (RMS) because of having a hot-cell capable of handling high radioactive materials. And then in controlled radiation zone, which is hot-cell and its maintenance and operation / control room, area dose rate, radioactivities in air-bone particulates and stack, and surface contamination are monitored continuously. For the effective management such as higher utilization, maintenance and repair, the status of this radiation monitoring system, the operation and characteristics of all kinds of detectors and other parts of composing this system, and signal treatment and its evaluation were described in this technical report. And to obtain the accuracy detection results and its higher confidence level, the procedure such as maintenance, functional check and system calibration were established and appended to help the operation of RMS. (author). 6 tabs., 30 figs

  1. On the effect of emotional states on operator thinking. [psychological test for operator selection

    Science.gov (United States)

    Solodkova, A. V.

    1975-01-01

    A combination sonic and electrical skin stimuli stress test is reported that is suitable for the psychological selection of individuals to perform operator functions. The behavior of these people is characterized by a fighting spirit, increased work capacity, minimum expenditure of strength and insignificant fatigue.

  2. Construction, testing, and initial operation of Fort St. Vrain PCRV

    International Nuclear Information System (INIS)

    Ople, F.S. Jr.; Neylan, A.J.

    1975-01-01

    The Fort St. Vrain (FSV) Nuclear Generating Station is the first station in the USA to use a prestressed concrete reactor vessel (PCRV). The PCRV was designed and constructed by General Atomic. Construction of the PCRV was completed in 1970; the pressure and leak tests were completed in 1971. The structural behavior of the PCRV has been monitored by installed instrumentation since start of construction. The highlights of the actual construction, testing, and initial operation of the PCRV, including a comparison of structural behavior, where possible, between observed data and analytical predictions. (U.S.)

  3. Motor operated valve testing and the 'rate of loading' phenomenon

    International Nuclear Information System (INIS)

    Black, B.R.

    1991-01-01

    This paper discusses valve design features which affect the ability to predict motor operated valve (MOV) performance and reviews factors which should be considered when selecting switch settings to limit stem loads. Considerable attention is given to the rate of loading phenomenon which affects the relationship between valve stem thrust and actuator spring pack deflection. Equations are developed, and testing is discussed which permit the construction of an MOV dynamic model. Factors which must be considered when maintaining switch settings correct throughout the life of the plant are discussed. And switch setting acceptance criteria for use with baseline Static and Design Basis testing are suggested

  4. Secondary coolant circuit operation tests: steam generator feedwater supply

    International Nuclear Information System (INIS)

    Beroux, M.

    1985-01-01

    No one important accident occurred during the start-up tests of the 1300MWe P4 series, concerning the feedwater system of steam generators (SG). This communication comments on some incidents, that the tests allowed to detect very soon and which had no consequences on the operation of units: 1) Water hammer in feedwater tubes, and incidents met in the emergency steam generator water supply circuit. The technological differences between SG 900 and 1300 are pointed out, and the measures taken to prevent this problem are presented. 2) Incidents met on the emergency feedwater supply circuit of steam generators; mechanical or functional modifications involved by these incidents [fr

  5. Pilot plant for flue gas treatment - continuous operation tests

    International Nuclear Information System (INIS)

    Chmielewski, A.G.; Tyminski, B.; Iller, E.; Zimek, Z.; Licki, J.; Radzio, B.

    1995-01-01

    Tests of continuous operation have been performed on pilot plant at EPS Kaweczyn in the wide range of SO 2 concentration (500-3000 ppm). The bag filter has been applied for aerosol separation. The high efficiencies of SO 2 and NO x removal, approximately 90% were obtained and influenced by such process parameters as: dose, gas temperature and ammonia stoichiometry. The main apparatus of the pilot plant (e.g. both accelerators) have proved their reliability in hard industrial conditions. (Author)

  6. Operation of the Brookhaven national laboratory accelerator test facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Botke, I.; Chou, T.S.; Fernow, R.; Fischer, J.; Fisher, A.; Gallardo, J.; Ingold, G.; Malone, R.; Palmer, R.; Parsa, Z.; Pogorelsky, I.; Rogers, J.; Sheehan, J.; Srinivasan-Rao, T.; Tsang, T.; Ulc, S.; Van Steenbergen, A.; Wang, X.J.; Woodle, M.; Yu, L.H.

    1992-01-01

    Early operation of the 50 MeV high brightness electron linac of the Accelerator Test Facility is described along with experimental data. This facility is designed to study new linear acceleration techniques and new radiation sources based on linacs in combination with free electron lasers. The accelerator utilizes a photo-excited, metal cathode, radio frequency electron gun followed by two travelling wave accelerating sections and an Experimental Hall for the study program. (Author) 5 refs., 4 figs., tab

  7. Operation of the Brookhaven National Laboratory Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Botke, I.; Chou, T.S.; Fernow, R.; Fischer, J.; Fisher, A.; Gallardo, J.; Ingold, G.; Malone, R.; Palmer, R.; Parsa, Z.; Pogorelsky, I.; Rogers, J.; Sheehan, J.; Srinivasan-Rao, T.; Tsang, T.; Ulc, S.; van Steenbergen, A.; Wang, X.J.; Woodle, M.; Yu, L.H.

    1992-01-01

    Early operation of the 50 MeV high brightness electron linac of the Accelerator Test Facility is described along with experimental data. This facility is designed to study new linear acceleration techniques and new radiation sources based on linacs in combination with free electron lasers. The accelerator utilizes a photo-excited, metal cathode, radio frequency electron gun followed by two travelling wave accelerating sections and an Experimental Hall for the study program

  8. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  9. A Human Proximity Operations System test case validation approach

    Science.gov (United States)

    Huber, Justin; Straub, Jeremy

    A Human Proximity Operations System (HPOS) poses numerous risks in a real world environment. These risks range from mundane tasks such as avoiding walls and fixed obstacles to the critical need to keep people and processes safe in the context of the HPOS's situation-specific decision making. Validating the performance of an HPOS, which must operate in a real-world environment, is an ill posed problem due to the complexity that is introduced by erratic (non-computer) actors. In order to prove the HPOS's usefulness, test cases must be generated to simulate possible actions of these actors, so the HPOS can be shown to be able perform safely in environments where it will be operated. The HPOS must demonstrate its ability to be as safe as a human, across a wide range of foreseeable circumstances. This paper evaluates the use of test cases to validate HPOS performance and utility. It considers an HPOS's safe performance in the context of a common human activity, moving through a crowded corridor, and extrapolates (based on this) to the suitability of using test cases for AI validation in other areas of prospective application.

  10. Operating and test experience of EBR-II

    International Nuclear Information System (INIS)

    Sackett, J.I.

    1991-01-01

    EBR-II has operated for 27 years, the longest for any Liquid Metal Reactor (LMR) power plant. During that time, much has been learned about successful LMR operation and design. The basic lesson is that conservatism in design can pay significant dividends in operating reliability. Furthermore, such conservatism need not mean high cost. The EBR-II system emphasizes simplicity, minimizing the number of valves in the heat transport system, for example, and simplifying the primary heat-transport-system layout. Another lesson is that emphasizing reliability of the steam generating system at the sodium-water interface (by using duplex tubes in the case of EBR-II) has been well worth the higher initial costs; no problems with leakage have been encountered in EBR-II's operating history. Locating spent fuel storage in the primary tank and providing for decay heat removal by natural connective flow have also been contributors to EBR-II's success. The ability to accommodate loss of forced cooling or loss of heat sink passively has resulted in benefits for simplification, primarily through less reliance on emergency power and in not requiring the secondary sodium or steam systems to be safety grade. Also, the 'piped-pool' arrangement minimizes thermal stress to the primary tank and enhances natural convective flow. These benefits have been realized through a history of operation that has seen EBR-II evolve through four major phases in its test programs, culminating in its present mission as the Integral Fast Reactor (IFR) prototype. (author)

  11. Operating and test experience of EBR-II

    International Nuclear Information System (INIS)

    Sackett, J.I.

    1991-01-01

    EBR-2 has operated for 27 years, the longest for any Liquid Metal Reactor (LMR) power plant. During that time, much has been learned about successful LMR operation and design. The basic lesson is that conversatism in design can pay significant dividends in operating reliability. Furthermore, such conservatism need not mean high cost. The EBR-2 system emphasizes simplicity, minimizing the number of valves in the heat transport system, for example, and simplifying the primary heat-transport-system layout. Another lesson is that emphasizing reliability of the steam generating system at the sodium-water interface (by using duplex tubes in the case of EBR-2) has been well worth the higher initial costs; no problems with leakage have been encountered in EBR-2's operating history. Locating spent fuel storage in the primary tank and providing for decay heat removal by natural connective flow have also been contributors to EBR-2's success. The ability to accommodate loss of forced cooling or loss of heat sink passively has resulted in benefits for simplification, primarily through less reliance on emergency power and in not requiring the secondary sodium or steam systems to be safety grade. Also, the ''piped-pool '' arrangement minimizes thermal stress to the primary tank and enhances natural convective flow. These benefits have been realized through a history of operation that has seen EBR-2 evolve through four major phases in its test programs, culminating in its present mission as the Integral Fast Rector (IFR) prototype. 20 refs., 8 figs., 1 tab

  12. Preparation of acceptance tests and criteria for the Test Blanket Systems to be operated in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Laan, J.G. van der, E-mail: JaapG.vanderLaan@iter.org [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Cuquel, B. [AIRBUS Defence and Space S.A.S., 13115 Saint Paul Lez Durance (France); Demange, D.; Ghidersa, B.-E. [Karlsruhe Institute of Technology, Karlsruhe (Germany); Giancarli, L.M.; Iseli, M.; Jourdan, T. [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Nevière, J.-C. [Comex-Nucleaire, 13115 Saint Paul Lez Durance (France); Pascal, R.; Ring, W. [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France)

    2015-10-15

    Highlights: • Initial guideline for acceptance testing and acceptance criteria for Test Blanket Systems in ITER. • These tests complement those required by the applicable codes and standards, and regulations. • Completion of TBS manufacture will be followed by Factory Acceptance Testing, prior to shipment. • Next steps are “Reception Inspection Tests”, and on-site pre-installation and components tests. • This guideline allows the detailing of the TBS specific test plans and their scheduling. - Abstract: This paper describes the main acceptance criteria and required acceptance tests for the components of the six Test Blanket Systems to be installed and operated in ITER. It summarizes the guide-line toward the establishment of detailed test plans for the TBS, starting from the end-product at the ITER Members factories, and to generally define the type of tests that have to be performed on the ITER site after shipment, and/or prior to the systems final commissioning phase.

  13. Embracing Safe Ground Test Facility Operations and Maintenance

    Science.gov (United States)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  14. Operation, test, research and development of the high temperature engineering test reactor (HTTR). FY2003

    International Nuclear Information System (INIS)

    2005-03-01

    The High Temperature Engineering Test Reactor (HTTR) constructed at the Oarai Research Establishment of The Japan Atomic Energy Research Institute (JAERI) is the first high-temperature gas-cooled reactor (HTGR) in Japan, which is a graphite-moderated and helium gas-cooled reactor with 30MW of thermal power. Coolant of helium-gas circulates under the pressure of about 4Mpa, and the reactor inlet and outlet temperature are 395degC and 950degC (maximum), respectively coated particle fuel is used as fuel, and the HTTR core is composed of graphite prismatic blocks. The full power operation of 30MW was attained in December, 2001, and then JAERI received the commissioning license for the HTTR in March, 2002. Since 2002, we have been carrying out rated power operation, safety demonstration tests and several R and Ds, etc., and conducted the high-temperature test operation of 950degC in April, 2004. This report summarizes activities and test results on HTTR operation and maintenance as well as safety demonstration tests and several R and Ds, which were carried out in the fiscal year of 2003 before the high temperature test operation of 950degC. (author)

  15. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  16. Operational Experience from LCLS-II Cryomodule Testing

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Renzhuo [Fermilab; Hansen, Benjamin [Fermilab; White, Michael [Fermilab; Hurd, Joseph [Fermilab; Atassi, Omar Al [Fermilab; Bossert, Richard [Fermilab; Pei, Liujin [Fermilab; Klebaner, Arkadiy [Fermilab; Makara, Jerry [Fermilab; Theilacker, Jay [Fermilab; Kaluzny, Joshua [Fermilab; Wu, Genfa [Fermilab; Harms, Elvin [Fermilab

    2017-07-01

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

  17. Operational experience from LCLS-II cryomodule testing

    Science.gov (United States)

    Wang, R.; Hansen, B.; White, M.; Hurd, J.; Atassi, O. Al; Bossert, R.; Pei, L.; Klebaner, A.; Makara, J.; Theilacker, J.; Kaluzny, J.; Wu, G.; Harms, E.

    2017-12-01

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

  18. PSA-operations synergism for the advanced test reactor shutdown operations PSA

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1996-01-01

    The Advanced Test Reactor (ATR) Probabilistic Safety Assessment (PSA) for shutdown operations, cask handling, and canal draining is a successful example of the importance of good PSA-operations synergism for achieving a realistic and accepted assessment of the risks and for achieving desired risk reduction and safety improvement in a best and cost-effective manner. The implementation of the agreed-upon upgrades and improvements resulted in the reductions of the estimated mean frequency for core or canal irradiated fuel uncovery events, a total reduction in risk by a factor of nearly 1000 to a very low and acceptable risk level for potentially severe events

  19. Test Operations Procedure (TOP) 05-2-543 Enhanced Flight Termination Receiver (EFTR) Range Certification Testing

    Science.gov (United States)

    2011-07-25

    35 5.10 Signal Strength Telemetry Output ( SSTO ) (Test Number 10) ............ 38 5.11 Operational...All command outputs and monitor outputs shall respond properly. TOP 05-2-543 25 July 2011 38 5.10 Signal Strength Telemetry Output ( SSTO ...Test Number 10). a. Purpose. This test verifies that the signal strength telemetry output ( SSTO ) voltage is monotonic and directly related to the

  20. WRAP low level waste (LLW) glovebox operational test report

    International Nuclear Information System (INIS)

    Kersten, J.K.

    1998-01-01

    The Low Level Waste (LLW) Process Gloveboxes are designed to: receive a 55 gallon drum in an 85 gallon overpack in the Entry glovebox (GBIOI); and open and sort the waste from the 55 gallon drum, place the waste back into drum and relid in the Sorting glovebox (GB 102). In addition, waste which requires further examination is transferred to the LLW RWM Glovebox via the Drath and Schraeder Bagiess Transfer Port (DO-07-201) or sent to the Sample Transfer Port (STC); crush the drum in the Supercompactor glovebox (GB 104); place the resulting puck (along with other pucks) into another 85 gallon overpack in the Exit glovebox (GB 105). The status of the waste items is tracked by the Data Management System (DMS) via the Plant Control System (PCS) barcode interface. As an item is moved from the entry glovebox to the exit glovebox, the Operator will track an items location using a barcode reader and enter any required data on the DMS console. The Operational Test Procedure (OTP) will perform evolution's (described below) using the Plant Operating Procedures (POP) in order to verify that they are sufficient and accurate for controlled glovebox operation

  1. WRAP low level waste (LLW) glovebox operational test report

    Energy Technology Data Exchange (ETDEWEB)

    Kersten, J.K.

    1998-02-19

    The Low Level Waste (LLW) Process Gloveboxes are designed to: receive a 55 gallon drum in an 85 gallon overpack in the Entry glovebox (GBIOI); and open and sort the waste from the 55 gallon drum, place the waste back into drum and relid in the Sorting glovebox (GB 102). In addition, waste which requires further examination is transferred to the LLW RWM Glovebox via the Drath and Schraeder Bagiess Transfer Port (DO-07-201) or sent to the Sample Transfer Port (STC); crush the drum in the Supercompactor glovebox (GB 104); place the resulting puck (along with other pucks) into another 85 gallon overpack in the Exit glovebox (GB 105). The status of the waste items is tracked by the Data Management System (DMS) via the Plant Control System (PCS) barcode interface. As an item is moved from the entry glovebox to the exit glovebox, the Operator will track an items location using a barcode reader and enter any required data on the DMS console. The Operational Test Procedure (OTP) will perform evolution`s (described below) using the Plant Operating Procedures (POP) in order to verify that they are sufficient and accurate for controlled glovebox operation.

  2. High field, low current operation of engineering test reactors

    International Nuclear Information System (INIS)

    Schwartz, J.; Cohn, D.R.; Bromberg, L.; Williams, J.E.C.

    1987-06-01

    Steady state engineering test reactors with high field, low current operation are investigated and compared to high current, lower field concepts. Illustrative high field ETR parameters are R = 3 m, α ∼ 0.5 m, B ∼ 10 T, β = 2.2% and I = 4 MA. For similar wall loading the fusion power of an illustrative high field, low current concept could be about 50% that of a lower field device like TIBER II. This reduction could lead to a 50% decrease in tritium consumption, resulting in a substantial decrease in operating cost. Furthermore, high field operation could lead to substantially reduced current drive requirements and cost. A reduction in current drive source power on the order of 40 to 50 MW may be attainable relative to a lower field, high current design like TIBER II implying a possible cost savings on the order of $200 M. If current drive is less efficient than assumed, the savings could be even greater. Through larger β/sub p/ and aspect ratio, greater prospects for bootstrap current operation also exist. Further savings would be obtained from the reduced size of the first wall/blanket/shield system. The effects of high fields on magnet costs are very dependent on technological assumptions. Further improvements in the future may lie with advances in superconducting and structural materials

  3. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  4. Operating experiences since rise-to-power test in high temperature engineering test reactor (HTTR)

    International Nuclear Information System (INIS)

    Tochio, Daisuke; Watanabe, Shuji; Motegi, Toshihiro; Kawano, Shuichi; Kameyama, Yasuhiko; Sekita, Kenji; Kawasaki, Kozo

    2007-03-01

    The rise-to-power test of the High Temperature Engineering Test Reactor (HTTR) was actually started in April 2000. The rated thermal power of 30MW and the rated reactor outlet coolant temperature of 850degC were achieved in the middle of Dec. 2001. After that, the reactor thermal power of 30MW and the reactor outlet coolant temperature of 950degC were achieved in the final rise-to-power test in April 2004. After receiving the operation licensing at 850degC, the safety demonstration tests have conducted to demonstrate inherent safety features of the HTGRs as well as to obtain the core and plant transient data for validation of safety analysis codes and for establishment of safety design and evaluation technologies. This paper summarizes the HTTR operating experiences for six years from start of the rise-to-power test that are categorized into (1) Operating experiences related to advanced gas-cooled reactor design, (2) Operating experiences for improvement of the performance, (3) Operating experiences due to fail of system and components. (author)

  5. Generating realistic environments for cyber operations development, testing, and training

    Science.gov (United States)

    Berk, Vincent H.; Gregorio-de Souza, Ian; Murphy, John P.

    2012-06-01

    Training eective cyber operatives requires realistic network environments that incorporate the structural and social complexities representative of the real world. Network trac generators facilitate repeatable experiments for the development, training and testing of cyber operations. However, current network trac generators, ranging from simple load testers to complex frameworks, fail to capture the realism inherent in actual environments. In order to improve the realism of network trac generated by these systems, it is necessary to quantitatively measure the level of realism in generated trac with respect to the environment being mimicked. We categorize realism measures into statistical, content, and behavioral measurements, and propose various metrics that can be applied at each level to indicate how eectively the generated trac mimics the real world.

  6. Operability test procedure for 211BA flow proportional sampler

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    The purpose of this operability test procedure (OTP) is to verify the 211-BA flow proportional sampler system and components function correctly as intended by design. System test will include the sampling system, all associated instrumentation, and Facility Process Monitor and Control System (FPMCS). The combined chemical sewer stream from B Plant flows through sump 211BA-SMP-01 located in 211-BA and is continuously monitored for gamma and beta radiation and pH. 211-BA has been upgraded to include a flow proportional sampler. A specified sample volume will be withdrawn at programmed intervals from the 211BA sump and deposited in a 19 liter plastic carboy. The sampler will be programmed per the vendor installation and operations manual by B Plant instrument maintenance personnel. Samples will be taken during five consecutive sample cycles with the sample volumes and sample frequencies recorded for comparison purposes. Additional tests related to the sampler include the alarm circuitry for loss of power and failure to obtain sample

  7. Spent Fuel Test - Climax data acquisition system operations manual

    International Nuclear Information System (INIS)

    Nyholm, R.A.

    1983-01-01

    The Spent Fuel Test-Climax (SFT-C) is a test of the retrievable, deep geologic storage of commercially generated, spent nuclear reactor fuel in granite rock. Eleven spent fuel assemblies, together with 6 electrical simulators and 20 guard heaters, are emplaced 420 m below the surface in the Climax granite at the US Department of Energy Nevada Test Site. On June 2, 1978, Lawrence Livermore National Laboratory (LLNL) secured funding for the SFT-C, and completed spent fuel emplacement May 28, 1980. The multi-year duration test is located in a remote area and is unattended much of the time. An extensive array of radiological safety and geotechnical instrumentation is deployed to monitor the test performance. A dual minicomputer-based data acquisition system (DAS) collects and processes data from more than 900 analog instruments. This report documents the software element of the LLNL developed SFT-C Data Acquisition System. It defines the operating system and hardware interface configurations, the special applications software and data structures, and support software

  8. Operation, test, research and development of the high temperature engineering test reactor (HTTR). (FY2005)

    International Nuclear Information System (INIS)

    2007-03-01

    The High Temperature Engineering Test Reactor (HTTR) constructed at the Oarai Research and Development Center of the Japan Atomic Energy Agency (JAEA) is the first high-temperature gas-cooled reactor (HTGR) in Japan, which is a graphite-moderated and helium gas-cooled reactor with 30 MW of thermal power. The full power operation of 30 MW was attained in December, 2001, and then JAERI (JAEA) received the commissioning license for the HTTR in March, 2002. Since 2002, we have been carrying out rated power operation, safety demonstration tests and several R and Ds, etc., and conducted the high-temperature test operation of 950degC in April, 2004. In fiscal 2005 year, periodical inspection and overhaul of reactivity control system were conducted, and safety demonstration tests were promoted. This report summarizes activities and test results on HTTR operation and maintenance as well as safety demonstration tests and several R and Ds, which were carried out in the fiscal year of 2005. (author)

  9. The first operation of the Delphos plant: Test results

    International Nuclear Information System (INIS)

    Sarno, A.; Noviello, G.; Cordisco, S.; Di Paola, L.; Guerra, M.

    1991-09-01

    The data collected during the O and M of the Delphos plant and the testing results are presented and discussed. Together with the maintenance influence on the operation and production of the plant, the various downtime causes are pointed out. An extensive activity has been carried out to investigate the actual behaviour of the photovoltaic generator and the power conditioning unit. The analysis of the experimental results allows to focus on the different causes of loss and suggest some actions to be taken in order to improve the plant efficiency and increase the energy production. (author)

  10. Identifying areas of weakness in thoracic surgery residency training: a comparison of the perceptions of residents and program directors.

    Science.gov (United States)

    Edwards, Janet P; Schofield, Adam; Paolucci, Elizabeth Oddone; Schieman, Colin; Kelly, Elizabeth; Servatyari, Ramin; Dixon, Elijah; Ball, Chad G; Grondin, Sean C

    2014-01-01

    To identify core thoracic surgery procedures that require increased emphasis during thoracic surgery residency for residents to achieve operative independence and to compare the perspectives of residents and program directors in this regard. A modified Delphi process was used to create a survey that was distributed electronically to all Canadian thoracic surgery residents (12) and program directors (8) addressing the residents' ability to perform 19 core thoracic surgery procedures independently after the completion of residency. Residents were also questioned about the adequacy of their operative exposure to these 19 procedures during their residency training. A descriptive summary including calculations of frequencies and proportions was conducted. The perceptions of the 2 groups were then compared using the Fisher exact test employing a Bonferroni correction. The relationship between residents' operative exposure and their perceived operative ability was explored in the same fashion. The response rate was 100% for residents and program directors. No statistical differences were found between residents' and program directors' perceptions of residents' ability to perform the 19 core procedures independently. Both groups identified lung transplantation, first rib resection, and extrapleural pneumonectomy as procedures for which residents were not adequately prepared to perform independently. Residents' subjective ratings of operative exposure were in good agreement with their reported operative ability for 13 of 19 procedures. This study provides new insight into the perceptions of thoracic surgery residents and their program directors regarding operative ability. This study points to good agreement between residents and program directors regarding residents' surgical capabilities. This study provides information regarding potential weaknesses in thoracic surgery training, which may warrant an examination of the curricula of existing programs as well as a

  11. Operation, test, research and development of the High Temperature Engineering Test Reactor (HTTR). FY2013

    International Nuclear Information System (INIS)

    2014-12-01

    The High Temperature Engineering Test Reactor (HTTR), a graphite-moderated and helium gas-cooled reactor with 30MW of thermal power, constructed at the Oarai Research and Development Center of the Japan Atomic Energy Agency (JAEA) is the first high-temperature gas-cooled reactor (HTGR) in Japan. The HTTR was attained at the full power operation of 30MW in December 2001 and achieved the 950degC of outlet coolant temperature at the outside the reactor pressure vessel in June 2004. To establish and upgrade basic technologies for HTGRs, we have obtained demonstration test data necessary for several R and Ds, and accumulated operation and maintenance experience of HTGRs throughout the HTTR's operation such as rated power operations, safety demonstration tests and long-term high temperature operations, and so on. In fiscal year 2013, we started to prepare the application document of reactor installation license for the HTTR to prove conformity with the new research reactor's safety regulatory requirements taken effect from December 2013. We had been making effort to restart the HTTR which was stopped since the 2011 when the Pacific coast of Tohoku Earthquake (2011.3.11) occurred. This report summarizes activities and results of HTTR operation, maintenance, and several R and Ds, which were carried out in the fiscal year 2013. (author)

  12. Operation, test, research and development of the High Temperature Engineering Test Reactor (HTTR). FY2014

    International Nuclear Information System (INIS)

    2016-02-01

    The High Temperature Engineering Test Reactor (HTTR), a graphite-moderated and helium gas-cooled reactor with 30 MW of thermal power, constructed at the Oarai Research and Development Center of the Japan Atomic Energy Agency is the first high-temperature gas-cooled reactor (HTGR) in Japan. The HTTR was attained at the full power operation of 30 MW in December 2001 and achieved the 950degC of coolant outlet temperature at outside of the reactor pressure vessel in June 2004. To establish and upgrade basic technologies for HTGRs, we have obtained demonstration test data necessary for several R and Ds, and accumulated operation and maintenance experience of HTGRs throughout the HTTR's operation such as rated power operations, safety demonstration tests and long-term high temperature operations, and so on. In fiscal year 2014, we started to apply the application document of reactor installation license for the HTTR to prove conformity with the new research reactor's safety regulatory requirements taken effect from December 2013. We had been making effort to restart the HTTR which was stopped since the 2011 by the Pacific coast of Tohoku Earthquake. This report summarizes activities and results of HTTR operation, maintenance, and several R and Ds, which were carried out in the fiscal year 2014. (author)

  13. MagLev Cobra: Test Facilities and Operational Experiments

    International Nuclear Information System (INIS)

    Sotelo, G G; Dias, D H J N; De Oliveira, R A H; Ferreira, A C; De Andrade, R Jr; Stephan, R M

    2014-01-01

    The superconducting MagLev technology for transportation systems is becoming mature due to the research and developing effort of recent years. The Brazilian project, named MagLev-Cobra, started in 1998. It has the goal of developing a superconducting levitation vehicle for urban areas. The adopted levitation technology is based on the diamagnetic and the flux pinning properties of YBa 2 Cu 3 O 7−δ (YBCO) bulk blocks in the interaction with Nd-Fe-B permanent magnets. A laboratory test facility with permanent magnet guideway, linear induction motor and one vehicle module is been built to investigate its operation. The MagLev-Cobra project state of the art is presented in the present paper, describing some construction details of the new test line with 200 m.

  14. MagLev Cobra: Test Facilities and Operational Experiments

    Science.gov (United States)

    Sotelo, G. G.; Dias, D. H. J. N.; de Oliveira, R. A. H.; Ferreira, A. C.; De Andrade, R., Jr.; Stephan, R. M.

    2014-05-01

    The superconducting MagLev technology for transportation systems is becoming mature due to the research and developing effort of recent years. The Brazilian project, named MagLev-Cobra, started in 1998. It has the goal of developing a superconducting levitation vehicle for urban areas. The adopted levitation technology is based on the diamagnetic and the flux pinning properties of YBa2Cu3O7-δ (YBCO) bulk blocks in the interaction with Nd-Fe-B permanent magnets. A laboratory test facility with permanent magnet guideway, linear induction motor and one vehicle module is been built to investigate its operation. The MagLev-Cobra project state of the art is presented in the present paper, describing some construction details of the new test line with 200 m.

  15. Manual for operation of the multipurpose thermalhydraulic test facility TOPFLOW (Transient Two Phase Flow Test Facility)

    International Nuclear Information System (INIS)

    Beyer, M.; Carl, H.; Schuetz, H.; Pietruske, H.; Lenk, S.

    2004-07-01

    The Forschungszentrum Rossendorf (FZR) e. V. is constructing a new large-scale test facility, TOPFLOW, for thermalhydraulic single effect tests. The acronym stands for transient two phase flow test facility. It will mainly be used for the investigation of generic and applied steady state and transient two phase flow phenomena and the development and validation of models of computational fluid dynamic (CFD) codes. The manual of the test facility must always be available for the staff in the control room and is restricted condition during operation of personnel and also reconstruction of the facility. (orig./GL)

  16. Quantum spacetime operationally based on propagators for extended test particles

    International Nuclear Information System (INIS)

    Prugovecki, E.

    1981-01-01

    By taking into account the quantum aspects intrinsic to any operational definition of spatio-temporal relationships, a stochastic concept of spacetime emerges. In relation to its classical counterpart is realized as a stochastic mean around which quantum fluctuations become negligible only in the limit of macroscopic spacetime intervals. The test-particle propagators used in the proposed quantum concept of spacetime are derived by solving in a consistent manner the localizability problem for relativistic particles. This is achieved in the framework of the stochastic phase space formulation of quantum mechanics, which in the nonrelativistic context is shown to result from systems of imprimitivity related to phase space conserved probability currents derivable from bona fide convariant probability densities in stochastic phase spaces of one particle systems, which can be interpreted as due to measurements performed with extended rather than pointlike test particles. The associated particle propagators can be therefore consistently related to coordinate probability densities measurable by the exchange of photons in between test particles from a chosen standard. Quantum spacetime is defined as the family of propagators corresponding to all conceivable coherent flows of test particles. This family of free-fall propagators has to satisfy certain self-consistency conditions as well as consistent laws of motion which inplicitly determine the stochastic geometro-dynamics of quantum space-time. Field theory on quantum spacetime retains many of the formal features of conventional quantum field theory. On a fundamental epistemological level stochastic geometries emerge as essential prerequisites in the construction of spacetime models that would be operationally based and yet consistent with the relativity principle as well as with the uncertinty principle

  17. Operation of the radioactive acid digestion test unit

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1980-01-01

    The Radioactive Acid Digestion Test Unit (RADTU) has been constructed at Hanford to demonstrate the application of the Acid Digestion Process for treating combustible transuranic wastes and scrap materials. The RADTU with its original tray digestion vessel has recently completed a six-month campaign processing potentially contaminated nonglovebox wastes from a Hanford plutonium facility. During this campaign, it processed 2100 kg of largely cellulosic wastes at an average sustained processing rate of 3 kg/h as limited by the water boiloff rate from the acid feeds. The on-line operating efficiency was nearly 50% on a twelve hour/day, five day/week basis. Following this campaign, a new annular high rate digester has been installed for testing. In preliminary tests with simulated wastes, the new digester demonstrated a sustained capacity of 10 kg/h with greatly improved intimacy of contact between the digestion acid and the waste. The new design also doubles the heat transfer surface, which with reduced heat loss area, is expected to provide at least three times the water boiloff rate of the previous tray digester design. Following shakedown testing with simulated and low-level wastes, the new unit will be used to process combustible plutonium scrap and waste from Hanford plutonium facilities for the purposes of volume reduction, plutonium recovery, and stabilization of the final waste form

  18. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    Science.gov (United States)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  19. Development and operation of a mobile test facility for education

    Science.gov (United States)

    Davis, Christopher T.

    The automotive industry saw a large shift towards vehicle electrification after the turn of the century. It became necessary to ensure that new and existing engineers were qualified to design and calibrate these new systems. To ensure this training, Michigan Tech received a grant to develop a curriculum based around vehicle electrification. As part of this agenda, the Michigan Tech Mobile Laboratory was developed to provide hands-on training for professional engineers and technicians in hybrid electric vehicles and vehicle electrification. The Mobile Lab has since then increased the scope of the delivered curriculum to include other automotive areas and even customizable course content to meet specific needs. This thesis outlines the development of the Mobile Laboratory and its powertrain test facilities. The focus of this thesis is to discuss the different hardware and software systems within the lab and test cells. Detailed instructions on the operation and maintenance of each of the systems are discussed. In addition, this thesis outlines the setup and operation of the necessary equipment for several of the experiments for the on and off campus courses and seminars.

  20. Operability test procedure for TRUSAF assayer software upgrade

    International Nuclear Information System (INIS)

    Cejka, C.C.

    1995-01-01

    This OTP is to be used to ensure the operability of the Transuranic Waste Assay System (TRUWAS). The system was upgraded and requires a retest to assure satisfactory operation. The upgrade consists of an AST 486 computer to replace the IBM-PC/XT, and a software upgrade (CNEUT). The software calculations are performed in the same manner as in the previous system (NEUT), however, the new software is written in C Assembly Language. CNEUT is easier to use and far more powerful than the previous program. The TRUWAS is used to verify the TRU content of waste packages sent for storage in the Transuranic Storage and Assay Facility (TRUSAF). The TRUSAF is part of Westinghouse Hanford's certification program for waste to be shipped to the Waste Isolation Pilot Plant (WIPP) in New Mexico. The Transuranic Waste Assayer uses a combination passive-active neutron interrogation system to determine the TRU content of 55-gallon waste drums. The system consists of a shielded assay chamber; Deuterium-Tritium neutron generator; Helium-3 proportional counters; drum handling system; electronics including preamplifier, amplifier, and discriminator for each of the counter packages; and an AST 486 computer/printer system for data acquisition and analysis. The system can detect down to TRU levels of 10 nCi/g in the waste matrix. The equipment to be tested is: Assay Chamber Door Drum Turntable and Automatic Loading Platform Interlocks Assayer Software; and IBM computer/printer software. The objective of the test is to verify that the system is operational with the AST 486 computer, the software used in the new computer system correctly calculates TRU levels, and the new computer system is capable of storing and retrieving data

  1. Operation of the radioactive acid-digestion test unit (RADTU)

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1981-01-01

    At the Karlsruhe Nuclear Research Center, research and development work concerned with the acid digestion of combustible waste with high plutonium content is being carried out. The main objectives are the reduction of the waste volume, the recovery of the plutonium and the transformation of the process residues into a product suitable for final disposal. For this purpose an inactive demonstration plant with a throughput of 1.5 kg/h has been constructed. In the first version, the reactor of this plant was a tray reactor of the HEDL type. During test operations the sedimentation of a residue was observed on the tray. The density of this residue was higher than that of the residue suspended in the reaction acid. Experiments using tantalum oxide (D=8.4 g/cm 3 ) to simulate the plutonium oxide (D=11.5 g/cm 3 ) have verified this observation. This means that in active operation a sedimentation of plutonium oxide on the tray is to be expected. With respect to these results a new reactor was developed where the settling of the residue is avoided by appropriate design and high circulation velocity of the reaction acid. The reactor consists of a tube 50-80 mm in diameter, which is curved to form a closed loop with an arm length of about 1x1 m. Since October 1979 this ring reactor has been under inactive test operation. Its behaviour is very stable. The velocity of the reaction acid in the heater is 0.5-1 m/s. A settling of residues or tantalum oxide has not been observed. The throughput attained is comparable to that of the tray reactor but the space requirement is three times smaller, and the volume of the reaction acid four times smaller. (author)

  2. Culham names new director

    CERN Multimedia

    2003-01-01

    "The United Kingdom Atomic Energy Authority (UKAEA) announced the appointment of Professor Sir Chris Llewellyn Smith FRS (Fellow of the Royal Society) as Director of Culham, responsible for developing and implementing the strategy for the UK's fusion research programme" (1 page).

  3. Ideas for Directors.

    Science.gov (United States)

    Child Care Information Exchange, 1987

    1987-01-01

    Presents child care center directors with a variety of relevant management ideas from business and the child care field. They include translating employee body language; leadership myths; on-the-job teacher training; undesirable bosses; wasting employee talent; voicing disagreement; employee anger; encouraging creativity; and coping with late…

  4. Director Networks and Takeovers

    NARCIS (Netherlands)

    Renneboog, L.D.R.; Zhao, Y.

    2013-01-01

    Abstract: We study the impact of corporate networks on the takeover process. We find that better connected companies are more active bidders. When a bidder and a target have one or more directors in common, the probability that the takeover transaction will be successfully completed augments, and

  5. Director networks and takeovers

    NARCIS (Netherlands)

    Renneboog, L.D.R.; Zhao, Y.

    2014-01-01

    We study the impact of corporate networks on the takeover process. We find that better connected companies are more active bidders. When a bidder and a target have one or more directors in common, the probability that the takeover transaction will be successfully completed augments, and the duration

  6. REGIONAL CUSTOMS DIRECTORATES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    CABA STEFAN

    2009-05-01

    Full Text Available The management of a regional customs directorate is analyzed. A new approach of the managerial system, in the European integration context, is presented. The customs system is one of the first “doors” to a new economic, social and cultural community. For

  7. Director, Platform and Audience.

    Science.gov (United States)

    Meyer, Richard D.

    The open stage is discussed both as architecture and as part of a new theatrical style. In reference to use of the open stage, emphasis is given to specifics with which the director must deal, to special problems of the actor, to the approach to blocking a play, and to the open stage as "theatrical experience". The architectural advantage of the…

  8. Tonopah Test Range - Index

    Science.gov (United States)

    Capabilities Test Operations Center Test Director Range Control Track Control Communications Tracking Radars Photos Header Facebook Twitter YouTube Flickr RSS Tonopah Test Range Top TTR_TOC Tonopah is the testing range of choice for all national security missions. Tonopah Test Range (TTR) provides research and

  9. Prototype Repository. Tracer dilution tests during operation phase, test campaign 3

    Energy Technology Data Exchange (ETDEWEB)

    Harrstroem, Johan; Andersson, Peter (Geosigma AB (Sweden))

    2010-05-15

    The Prototype Repository project is focused on testing and demonstrating the function of the SKB deep repository system. The third tracer dilution campaign during the Prototype Repository operation period was performed in January 2010. The purpose was to estimate the groundwater flows and hydraulic gradients in the boreholes vicinity and will function as a reference for comparison with results from modeling and prior assumptions. The test campaign consisted of tracer dilution tests in 13 different borehole sections. Each test consisted of approximately 15-55 min tracer injection time and about 1-3 days dilution test time depending on the transmissivity of the test section. The data interpretation also included estimates of the local hydraulic gradients in the vicinity of the borehole sections

  10. Prediction of chronic post-operative pain: pre-operative DNIC testing identifies patients at risk.

    Science.gov (United States)

    Yarnitsky, David; Crispel, Yonathan; Eisenberg, Elon; Granovsky, Yelena; Ben-Nun, Alon; Sprecher, Elliot; Best, Lael-Anson; Granot, Michal

    2008-08-15

    Surgical and medical procedures, mainly those associated with nerve injuries, may lead to chronic persistent pain. Currently, one cannot predict which patients undergoing such procedures are 'at risk' to develop chronic pain. We hypothesized that the endogenous analgesia system is key to determining the pattern of handling noxious events, and therefore testing diffuse noxious inhibitory control (DNIC) will predict susceptibility to develop chronic post-thoracotomy pain (CPTP). Pre-operative psychophysical tests, including DNIC assessment (pain reduction during exposure to another noxious stimulus at remote body area), were conducted in 62 patients, who were followed 29.0+/-16.9 weeks after thoracotomy. Logistic regression revealed that pre-operatively assessed DNIC efficiency and acute post-operative pain intensity were two independent predictors for CPTP. Efficient DNIC predicted lower risk of CPTP, with OR 0.52 (0.33-0.77 95% CI, p=0.0024), i.e., a 10-point numerical pain scale (NPS) reduction halves the chance to develop chronic pain. Higher acute pain intensity indicated OR of 1.80 (1.28-2.77, p=0.0024) predicting nearly a double chance to develop chronic pain for each 10-point increase. The other psychophysical measures, pain thresholds and supra-threshold pain magnitudes, did not predict CPTP. For prediction of acute post-operative pain intensity, DNIC efficiency was not found significant. Effectiveness of the endogenous analgesia system obtained at a pain-free state, therefore, seems to reflect the individual's ability to tackle noxious events, identifying patients 'at risk' to develop post-intervention chronic pain. Applying this diagnostic approach before procedures that might generate pain may allow individually tailored pain prevention and management, which may substantially reduce suffering.

  11. Carlos Martinez-Riera, general-director of international co-operation and institutional relations, ministry of science and innovation for Spain

    CERN Multimedia

    Maximilien Brice

    2011-01-01

    Visited the CMS control room with Maria Chamizo-Llatas, CMS deputy run co-ordinator, CIEMAT, when he came to CERN on 11 May. He also saw the CMS underground experimental area and the LHC superconducting magnet test hall.

  12. Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing

    Science.gov (United States)

    2018-04-27

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing 5a. CONTRACT...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Dugway Proving Ground West Desert Test Center (TEDT-DPW) Dugway, UT 84022-5000 8. PERFORMING ORGANIZATION

  13. Construction, commissioning and initial operation of 2400W refrigerator and cold test stand for CDM testing

    International Nuclear Information System (INIS)

    Dubbs, J.D.; Kreinbrink, K.

    1994-01-01

    Air Products and CVI collaborated to design, construct and commission a refrigerator, test stands and integrated control system for the General Dynamics Collider Dipole Magnet Cold Test Facility (CTF) in Hammond, LA. The original project schedule required the cold test facility to be operational within 17 months of the notice to proceed. Midway through the project, changes in General Dynamics magnet testing requirements necessitated doubling the plant capacity, but the on stream date for the initial capacity increment could not be relaxed. The Air Products/CVI team had to adapt the project execution strategy to mitigate the schedule impact of the expansion in a cost effective manner without impacting system functionality, quality or safety. An equally challenging aspect of the job was that the (CTF) was being designed while several major systems that would interface with the CTF were being engineered. General Dynamics, Air Products and CVI had to work very closely to manage the interface issues. The teams efforts were very successful. The Hammond refrigerator/liquifier was started up on schedule. The first two test stands are currently being commissioned and will be on stream just six weeks later than the pre-expansion schedule target and all four test stands will be operational in time to support General Dynamics magnet testing requirements

  14. Autonomous Cryogenics Loading Operations Simulation Software: Knowledgebase Autonomous Test Engineer

    Science.gov (United States)

    Wehner, Walter S., Jr.

    2013-01-01

    Working on the ACLO (Autonomous Cryogenics Loading Operations) project I have had the opportunity to add functionality to the physics simulation software known as KATE (Knowledgebase Autonomous Test Engineer), create a new application allowing WYSIWYG (what-you-see-is-what-you-get) creation of KATE schematic files and begin a preliminary design and implementation of a new subsystem that will provide vision services on the IHM (Integrated Health Management) bus. The functionality I added to KATE over the past few months includes a dynamic visual representation of the fluid height in a pipe based on number of gallons of fluid in the pipe and implementing the IHM bus connection within KATE. I also fixed a broken feature in the system called the Browser Display, implemented many bug fixes and made changes to the GUI (Graphical User Interface).

  15. Modeling motive activation in the Operant Motives Test

    DEFF Research Database (Denmark)

    Runge, J. Malte; Lang, Jonas W. B.; Engeser, Stefan

    2016-01-01

    The Operant Motive Test (OMT) is a picture-based procedure that asks respondents to generate imaginative verbal behavior that is later coded for the presence of affiliation, power, and achievement-related motive content by trained coders. The OMT uses a larger number of pictures and asks...... on the dynamic model were .52, .62, and .73 for the affiliation, achievement, and power motive in the OMT, respectively. The second contribution of this article is a tutorial and R code that allows researchers to directly apply the dynamic Thurstonian IRT model to their data. The future use of the OMT...... respondents to provide more brief answers than earlier and more traditional picture-based implicit motive measures and has therefore become a frequently used measurement instrument in both research and practice. This article focuses on the psychometric response mechanism in the OMT and builds on recent...

  16. Development of a Remotely Operated Vehicle Test-bed

    Directory of Open Access Journals (Sweden)

    Biao WANG

    2013-06-01

    Full Text Available This paper presents the development of a remotely operated vehicle (ROV, designed to serve as a convenient, cost-effective platform for research and experimental validation of hardware, sensors and control algorithms. Both of the mechanical and control system design are introduced. The vehicle with a dimension 0.65 m long, 0.45 m wide has been designed to have a frame structure for modification of mounted devices and thruster allocation. For control system, STM32 based MCU boards specially designed for this project, are used as core processing boards. And an open source, modular, flexible software is developed. Experiment results demonstrate the effectiveness of the test-bed.

  17. Operation and tests of a DDC101 A/D

    International Nuclear Information System (INIS)

    Nguyen, H.

    1994-11-01

    For the KTeV PMT laser monitoring system, one needs a high resolution device with a large dynamic range to be used for digitizing PIN photodiodes. The dynamic range should be wider than or comparable to the KTeV digitizer (17-bits). The Burr-Brown DDC101 is a precision, wide dynamic range, charge digitizing A/D converter with 20-bit resolution, packaged in a 28-pin plastic, double-wide DP. Low level current output devices, such as photosensors can be directly connected to its input. The digital output can be clocked-out serially from the pins. For typical operations, a relatively wide gate of 1 msec should be used. The full scale charge is 500 pC for unipolar mode. The bipolar mode scale is ± 250 pC. The advertised integral nonlinearity is 0.003% of FSR. This document describes only the basic DDC101 operations since full detail can be found in the DDC101 manual. Tests results are given in section 3

  18. Operability Test Report for 241-T compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1995-02-01

    This Operability Test Report (OTR) documents the results of functional testing performed on the operating parameters of the 241-T-701 Compressed Air System. The System was successfully installed and tested per work package 2W-92-01172

  19. Operability test procedure for the Rotary Mode Core Sampling System Exhausters 3 and 4

    International Nuclear Information System (INIS)

    WSaldo, E.J.

    1995-01-01

    This document provides a procedure for performing operability testing of the Rotary Mode Core Sampling System Exhausters 3 ampersand 4. Upon completion of testing activities an operability testing report will be issued

  20. Operation and post operative examinations on the 1 MW test section SDP-1

    International Nuclear Information System (INIS)

    Casalini, P.; Valentini, P.; Urbani, A.

    1975-01-01

    The tests carried out were essentially, of general interest and could regard the general Performance and the behavior of the materials. The last aspect was rather interesting as the steam generator coil consists of a steel which has not been yet homologated in Italy. As already specified, the geometry of the steam generator was somewhat particular: it consisted of a stainless steel (Type AISI 316) cylindrical envelope with a diameter of about 500 mm and about 4 m high, with inside an helicoidal duct having a rectangular section, also in AISI 316 stainless steel. Three helicoidal tubes with an outer diameter of 26,9 mm and a thickness of 5 mm, out of ferritic steel - Type Mannesman F 11 were arranged inside the duct. The rectangular duct was run through by sodium downwards, while water/steam was running through the three parallel tubes upwards. The main characteristics pertaining to the steam generator and the nominal operational data are given. All the tests carried out on the tube coil resulted in noticeable alteration due to operation in sodium. In particular, with regard to the absence of variation of the carbon content between the inner and outer side in all the specimens analyzed, one can conclude that no considerable mass transfer occurred in the tube

  1. Message from Fermilab Director

    CERN Multimedia

    2009-01-01

    With this issue’s message, Fermilab Director Pier Oddone opens a new series of occasional exchanges between CERN and other laboratories world-wide. As part of this exchange, CERN Director-General Rolf Heuer, wrote a message in Tuesday’s edition of Fermilab TodayPerspectivesNothing is more important for our worldwide particle physics community than successfully turning on the LHC later this year. The promise for great discoveries is huge, and many of the plans for our future depend on LHC results. Those of us planning national programmes in anticipation of data from the LHC face formidable challenges to develop future facilities that are complementary to the LHC, whatever the physics discoveries may be. At Fermilab, this has led us to move forcefully with a programme at the intensity frontier, where experiments with neutrinos and rare decays open a complementary window into nature. Our ultimate goal for a unified picture of nat...

  2. Beam director design report

    International Nuclear Information System (INIS)

    Younger, F.C.

    1986-08-01

    A design and fabrication effort for a beam director is documented. The conceptual design provides for the beam to pass first through a bending and focusing system (or ''achromat''), through a second achromat, through an air-to-vacuum interface (the ''beam window''), and finally through the vernier steering system. Following an initial concept study for a beam director, a prototype permanent magnet 30 0 beam-bending achromat and prototype vernier steering magnet were designed and built. In volume II, copies are included of the funding instruments, requests for quotations, purchase orders, a complete set of as-built drawings, magnetic measurement reports, the concept design report, and the final report on the design and fabrication project

  3. Test results for fuel cell operation on anaerobic digester gas

    Science.gov (United States)

    Spiegel, R. J.; Preston, J. L.

    EPA, in conjunction with ONSI, embarked on a project to define, design, test, and assess a fuel cell energy recovery system for application at anaerobic digester waste water (sewage) treatment plants. Anaerobic digester gas (ADG) is produced at these plants during the process of treating sewage anaerobically to reduce solids. ADG is primarily comprised of methane (57-66%), carbon dioxide (33-39%), nitrogen (1-10%), and a small amount of oxygen (sulfur-bearing compounds (principally hydrogen sulfide) and halogen compounds (chlorides). The project has addressed two major issues: development of a cleanup system to remove fuel cell contaminants from the gas and testing/assessing of a modified ONSI PC25 C fuel cell power plant operating on the cleaned, but dilute, ADG. Results to date demonstrate that the ADG fuel cell power plant can, depending on the energy content of the gas, produce electrical output levels close to full power (200 kW) with measured air emissions comparable to those obtained by a natural gas fuel cell. The cleanup system results show that the hydrogen sulfide levels are reduced to below 10 ppbv and halides to approximately 30 ppbv.

  4. A well test analysis method accounting for pre-test operations

    International Nuclear Information System (INIS)

    Silin, D.B.; Tsang, C.-F.

    2003-01-01

    We propose to use regular monitoring data from a production or injection well for estimating the formation hydraulic properties in the vicinity of the wellbore without interrupting the operations. In our approach, we select a portion of the pumping data over a certain time interval and then derive our conclusions from analysis of these data. A distinctive feature of the proposed approach differing it form conventional methods is in the introduction of an additional parameter, an effective pre-test pumping rate. The additional parameter is derived based on a rigorous asymptotic analysis of the flow model. Thus, we account for the non-uniform pressure distribution at the beginning of testing time interval caused by pre-test operations at the well. By synthetic and field examples, we demonstrate that deviation of the matching curve from the data that is usually attributed to skin and wellbore storage effects, can also be interpreted through this new parameter. Moreover, with our method, the data curve is matched equally well and the results of the analysis remain stable when the analyzed data interval is perturbed, whereas traditional methods are sensitive to the choice of the data interval. A special efficient minimization procedure has been developed for searching the best fitting parameters. We enhanced our analysis above with a procedure of estimating ambient reservoir pressure and dimensionless wellbore radius. The methods reported here have been implemented in code ODA (Operations Data Analysis). A beta version of the code is available for free testing and evaluation to interested parties

  5. Discussion with CERN Directorate

    CERN Document Server

    CERN. Geneva

    2017-01-01

    Please note that the Discussion with CERN Directorate will be transmitted also in the following rooms: Council Chamber - 503-1-001 IT Amphitheatre - 31-3-004 Prevessin 774-R-013 Simultaneous interpreting into French and English will be available in the Main Auditorium. Une interprétation simultanée en français et en anglais sera disponible dans l'amphithéâtre principal.

  6. Lands directorate publications

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The directorate has a lead role in providing advice to the federal government on land use policy in Canada. The Canada Land Inventory (CLI) Program has produced significant amounts of data pertaining to the capability of Canadian lands to support agriculture, forestry, recreation, wildlife and sport fish. A list of CLI reports is presented in this publication. In addition, and capability maps have been compiled for agricultural, forestry, recreation and wildlife and are listed and described in this publication. (KRM)

  7. Secure Retrieval of FFTF Testing, Design, and Operating Information

    International Nuclear Information System (INIS)

    Butner, R. Scott; Wootan, David W.; Omberg, Ronald P.; Makenas, Bruce J.; Nielsen, Deborah

    2009-01-01

    One of the goals of the Advanced Fuel Cycle Initiative (AFCI) is to preserve the knowledge that has been gained in the United States on Liquid Metal Reactors (LMR). In addition, preserving LMR information and knowledge is part of a larger international collaborative activity conducted under the auspices of the International Atomic Energy Agency (IAEA). A similar program is being conducted for EBR-II at the Idaho Nuclear Laboratory (INL) and international programs are also in progress. Knowledge preservation at the FFTF is focused on the areas of design, construction, startup, and operation of the reactor. As the primary function of the FFTF was testing, the focus is also on preserving information obtained from irradiation testing of fuels and materials. This information will be invaluable when, at a later date, international decisions are made to pursue new LMRs. In the interim, this information may be of potential use for international exchanges with other LMR programs around the world. At least as important in the United States, which is emphasizing large-scale computer simulation and modeling, this information provides the basis for creating benchmarks for validating and testing these large scale computer programs. Although the preservation activity with respect to FFTF information as discussed below is still underway, the team of authors above is currently retrieving and providing experimental and design information to the LMR modeling and simulation efforts for use in validating their computer models. On the Hanford Site, the FFTF reactor plant is one of the facilities intended for decontamination and decommissioning consistent with the cleanup mission on this site. The reactor facility has been deactivated and is being maintained in a cold and dark minimal surveillance and maintenance mode until final decommissioning is pursued. In order to ensure protection of information at risk, the program to date has focused on sequestering and secure retrieval

  8. Foreword by the director of Bohunice NPPs

    International Nuclear Information System (INIS)

    1998-01-01

    In this foreword the director briefly describes activities of the NPP Bohunice in 1997. Main activities were: electric and heat production , the V-1 NPP Gradual Reconstruction Programme, nuclear safety programmes, environment protection, international co-operation as well as national and international public information

  9. Operational Test Report for the 241-AZ-101 Suspended Solids Profiler

    International Nuclear Information System (INIS)

    STENKAMP, D.M.

    2000-01-01

    This document comprises the Operational Test Report for the 241-AZ-101 Suspended Solids Profiler. This document presents the results of Operational Testing of the 241-AZ-101 Suspended Solids Profiler (SSP). Testing of the SSP was performed in accordance with OTP-260-005, ''SUSPENDED SOLIDS PROFILER OPERATIONAL TEST PROCEDURE''. The objective of the testing was to verify that all equipment and components functioned as designed, following construction completion and turnover to operations

  10. Autonomous Cryogenic Load Operations: Knowledge-Based Autonomous Test Engineer

    Science.gov (United States)

    Schrading, J. Nicolas

    2013-01-01

    The Knowledge-Based Autonomous Test Engineer (KATE) program has a long history at KSC. Now a part of the Autonomous Cryogenic Load Operations (ACLO) mission, this software system has been sporadically developed over the past 20 years. Originally designed to provide health and status monitoring for a simple water-based fluid system, it was proven to be a capable autonomous test engineer for determining sources of failure in the system. As part of a new goal to provide this same anomaly-detection capability for a complicated cryogenic fluid system, software engineers, physicists, interns and KATE experts are working to upgrade the software capabilities and graphical user interface. Much progress was made during this effort to improve KATE. A display of the entire cryogenic system's graph, with nodes for components and edges for their connections, was added to the KATE software. A searching functionality was added to the new graph display, so that users could easily center their screen on specific components. The GUI was also modified so that it displayed information relevant to the new project goals. In addition, work began on adding new pneumatic and electronic subsystems into the KATE knowledge base, so that it could provide health and status monitoring for those systems. Finally, many fixes for bugs, memory leaks, and memory errors were implemented and the system was moved into a state in which it could be presented to stakeholders. Overall, the KATE system was improved and necessary additional features were added so that a presentation of the program and its functionality in the next few months would be a success.

  11. Autonomous Cryogenic Load Operations: KSC Autonomous Test Engineer

    Science.gov (United States)

    Shrading, Nicholas J.

    2012-01-01

    The KSC Autonomous Test Engineer (KATE) program has a long history at KSC. Now a part of the Autonomous Cryogenic Load Operations (ACLO) mission, this software system has been sporadically developed over the past 20+ years. Originally designed to provide health and status monitoring for a simple water-based fluid system, it was proven to be a capable autonomous test engineer for determining sources of failure in. the system, As part.of a new goal to provide this same anomaly-detection capability for a complicated cryogenic fluid system, software engineers, physicists, interns and KATE experts are working to upgrade the software capabilities and graphical user interface. Much progress was made during this effort to improve KATE. A display ofthe entire cryogenic system's graph, with nodes for components and edges for their connections, was added to the KATE software. A searching functionality was added to the new graph display, so that users could easily center their screen on specific components. The GUI was also modified so that it displayed information relevant to the new project goals. In addition, work began on adding new pneumatic and electronic subsystems into the KATE knowledgebase, so that it could provide health and status monitoring for those systems. Finally, many fixes for bugs, memory leaks, and memory errors were implemented and the system was moved into a state in which it could be presented to stakeholders. Overall, the KATE system was improved and necessary additional features were added so that a presentation of the program and its functionality in the next few months would be a success.

  12. In situ vitrification large-scale operational acceptance test analysis

    International Nuclear Information System (INIS)

    Buelt, J.L.; Carter, J.G.

    1986-05-01

    A thermal treatment process is currently under study to provide possible enhancement of in-place stabilization of transuranic and chemically contaminated soil sites. The process is known as in situ vitrification (ISV). In situ vitrification is a remedial action process that destroys solid and liquid organic contaminants and incorporates radionuclides into a glass-like material that renders contaminants substantially less mobile and less likely to impact the environment. A large-scale operational acceptance test (LSOAT) was recently completed in which more than 180 t of vitrified soil were produced in each of three adjacent settings. The LSOAT demonstrated that the process conforms to the functional design criteria necessary for the large-scale radioactive test (LSRT) to be conducted following verification of the performance capabilities of the process. The energy requirements and vitrified block size, shape, and mass are sufficiently equivalent to those predicted by the ISV mathematical model to confirm its usefulness as a predictive tool. The LSOAT demonstrated an electrode replacement technique, which can be used if an electrode fails, and techniques have been identified to minimize air oxidation, thereby extending electrode life. A statistical analysis was employed during the LSOAT to identify graphite collars and an insulative surface as successful cold cap subsidence techniques. The LSOAT also showed that even under worst-case conditions, the off-gas system exceeds the flow requirements necessary to maintain a negative pressure on the hood covering the area being vitrified. The retention of simulated radionuclides and chemicals in the soil and off-gas system exceeds requirements so that projected emissions are one to two orders of magnitude below the maximum permissible concentrations of contaminants at the stack

  13. Quality assurance during preoperational testing and during startup operation

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.

    1980-01-01

    Rules and guidelines for the quality assurance. Quality assurance in the course of preoperational testing and the startup period: preoperational testing; hot functional test I; hot functional test II; initial making critical and zero power physics testing; power range testing. Startup documents: startup program; startup instructions; startup data sheet; startup sequence outlines; final startup reports. Advisory safety committee for nuclear startup. (orig./RW)

  14. Construction site Voice Operated Information System (VOIS) test

    Science.gov (United States)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  15. Minimization of mixed waste in explosive testing operations

    International Nuclear Information System (INIS)

    Gonzalez, M.A.; Sator, F.E.; Simmons, L.F.

    1993-02-01

    In the 1970s and 1980s, efforts to manage mixed waste and reduce pollution focused largely on post-process measures. In the late 1980s, the approach to waste management and pollution control changed, focusing on minimization and prevention rather than abatement, treatment, and disposal. The new approach, and the formulated guidance from the US Department of Energy, was to take all necessary measures to minimize waste and prevent the release of pollutants to the environment. Two measures emphasized in particular were source reduction (reducing the volume and toxicity of the waste source) and recycling. In 1988, a waste minimization and pollution prevention program was initiated at Site 300, where the Lawrence Livermore National Laboratory (LLNL) conducts explosives testing. LLNL's Defense Systems/Nuclear Design (DS/ND) Program has adopted a variety of conservation techniques to minimize waste generation and cut disposal costs associated with ongoing operations. The techniques include minimizing the generation of depleted uranium and lead mixed waste through inventory control and material substitution measures and through developing a management system to recycle surplus explosives. The changes implemented have reduced annual mixed waste volumes by more than 95% and reduced overall radioactive waste generation (low-level and mixed) by more than 75%. The measures employed were cost-effective and easily implemented

  16. 200-BP-5 operable unit treatability test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  17. 200-BP-5 operable unit treatability test report

    International Nuclear Information System (INIS)

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites

  18. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  19. Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

    Science.gov (United States)

    Hacker, Scott

    2012-01-01

    The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

  20. Review and updates of the risk assessment for advanced test reactor operations for operating events and experience

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1996-01-01

    Annual or biannual reviews of the operating history of the Advanced Test Reactor (ATR) at the Idaho National Engineering Laboratory (INEL) have been conducted for the purpose of reviewing and updating the ATR probabilistic safety assessment (PSA) for operating events and operating experience since the first compilation of plant- specific experience data for the ATR PSA which included data for operation from initial power operation in 1969 through 1988. This technical paper briefly discusses the means and some results of these periodic reviews of operating experience and their influence on the ATR PSA

  1. Operational status of the Brookhaven National Laboratory Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Chou, T.S.; Los Alamos National Lab., NM; Princeton Univ., NJ

    1989-01-01

    Design and operation of a 50 MeV Electron Linear Accelerator utilizing a low emittance (γ var epsilon = 5 to 10 mm-mrad) radio frequency gun operating at an output energy of 5 MeV and a charge of 1 nC is described. Design calculations and early radio frequency measurements and operational experience with the electron gun utilizing a dummy copper cathode in place of the proposed photocathode emitter are given. 6 refs., 9 figs., 1 tab

  2. Smart Infrared Inspection System Field Operational Test Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Siekmann, Adam [ORNL; Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL

    2011-06-01

    The Smart InfraRed Inspection System (SIRIS) is a tool designed to assist inspectors in determining which vehicles passing through the SIRIS system are in need of further inspection by measuring the thermal data from the wheel components. As a vehicle enters the system, infrared cameras on the road measure temperatures of the brakes, tires, and wheel bearings on both wheel ends of commercial motor vehicles (CMVs) in motion. This thermal data is then presented to enforcement personal inside of the inspection station on a user friendly interface. Vehicles that are suspected to have a violation are automatically alerted to the enforcement staff. The main goal of the SIRIS field operational test (FOT) was to collect data to evaluate the performance of the prototype system and determine the viability of such a system being used for commercial motor vehicle enforcement. From March 2010 to September 2010, ORNL facilitated the SIRIS FOT at the Greene County Inspection Station (IS) in Greeneville, Tennessee. During the course of the FOT, 413 CMVs were given a North American Standard (NAS) Level-1 inspection. Of those 413 CMVs, 384 were subjected to a SIRIS screening. A total of 36 (9.38%) of the vehicles were flagged by SIRIS as having one or more thermal issues; with brakes issues making up 33 (91.67%) of those. Of the 36 vehicles flagged as having thermal issues, 31 (86.11%) were found to have a violation and 30 (83.33%) of those vehicles were placed out-of-service (OOS). Overall the enforcement personnel who have used SIRIS for screening purposes have had positive feedback on the potential of SIRIS. With improvements in detection algorithms and stability, the system will be beneficial to the CMV enforcement community and increase overall trooper productivity by accurately identifying a higher percentage of CMVs to be placed OOS with minimal error. No future evaluation of SIRIS has been deemed necessary and specifications for a production system will soon be drafted.

  3. Craig Reynolds, Ph.D., to Retire as NCI Associate Director for Frederick | Poster

    Science.gov (United States)

    On December 2, Craig Reynolds, Ph.D., director, Office of Scientific Operations, and NCI associate director for Frederick, will put the finishing touches on a 37-year career with the National Cancer Institute.

  4. Real-time Testing of Operating Systems on Raspberry Pi

    OpenAIRE

    Murstad, Amund

    2016-01-01

    A subset of operating systems are called ``real time'' operating systems. While a general operating system like Windows or OSX can make no guarantee when a process gets to run, a real time one has the ability to do so. They are used for systems where the quality of the results from the operating system is not only defined by their correctness, but also by when they arrive. These kinds of systems are called Real-time Systems and can be divided into soft, hard and firm. If a deadline is missed ...

  5. Computation Directorate 2007 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Henson, V E; Guse, J A

    2008-03-06

    software; from expanding BlueGene/L, the world's most powerful computer, by 60% and using it to capture the most prestigious prize in the field of computing, to helping create an automated control system for the National Ignition Facility (NIF) that monitors and adjusts more than 60,000 control and diagnostic points; from creating a microarray probe that rapidly detects virulent high-threat organisms, natural or bioterrorist in origin, to replacing large numbers of physical computer servers with small numbers of virtual servers, reducing operating expense by 60%, the people in Computation have been at the center of weighty projects whose impacts are felt across the Laboratory and the DOE community. The accomplishments I just mentioned, and another two dozen or so, make up the stories contained in this report. While they form an exceptionally diverse set of projects and topics, it is what they have in common that excites me. They share the characteristic of being central, often crucial, to the mission-driven business of the Laboratory. Computational science has become fundamental to nearly every aspect of the Laboratory's approach to science and even to the conduct of administration. It is difficult to consider how we would proceed without computing, which occurs at all scales, from handheld and desktop computing to the systems controlling the instruments and mechanisms in the laboratories to the massively parallel supercomputers. The reasons for the dramatic increase in the importance of computing are manifest. Practical, fiscal, or political realities make the traditional approach to science, the cycle of theoretical analysis leading to experimental testing, leading to adjustment of theory, and so on, impossible, impractical, or forbidden. How, for example, can we understand the intricate relationship between human activity and weather and climate? We cannot test our hypotheses by experiment, which would require controlled use of the entire earth over centuries

  6. Director`s series on proliferation

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, K.C. [ed.

    1993-09-07

    Two essays are included in this booklet. Their titles are ``The Dynamics of the NPT Extension Decision`` and ``North Korea`s Nuclear Gambit.`` The first paper discusses the conference to be held in 1995 to review the Nuclear Non-Proliferation Treaty (NPT) which will decide whether the treaty shall continue in force indefinitely, or shall be extended for an additional fixed period or periods. Topics relevant to this discussion are: Arms control issues, the nuclear test ban, the limited test ban treaty, the French nuclear testing moratorium, former Soviet nuclear weapons, Iraq, North Korea, nuclear-weapon-free zones, security, controls on nuclear weapon materials, peaceful uses of nuclear energy, safeguards, politics, and organizational and procedural issues. The second paper examines short, medium, and long term issues entailed in Korea`s nuclear proliferation. Topics considered include: Korean unification, North Korean politics, the nuclear issue as leverage, and the Nuclear Non- Proliferation Treaty.

  7. Thrown object testing of forest machine operator protective structures

    Science.gov (United States)

    S.E. Taylor; M.W. Veal; R.B. Rummer

    2003-01-01

    High-speed chains or rotating disks are commonly used to cut and process trees during forest harvesting operations. Mechanical failure or fatigue of these tools can lead to a potentially hazardous situation where fragments of chain or sawteeth are thrown through the operator enclosures on forest machines. This poster presentation discusses the development and...

  8. 200 Area Treated Effluent Disposal Facility operational test specification. Revision 2

    International Nuclear Information System (INIS)

    Crane, A.F.

    1995-01-01

    This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met. The technical requirements for operational testing of the 200 Area TEDF are defined by the test requirements presented in Appendix A. These test requirements demonstrate the following: pump station No.1 and associated support equipment operate both automatically and manually; pump station No. 2 and associated support equipment operate both automatically and manually; water is transported through the collection and transfer lines to the disposal ponds with no detectable leakage; the disposal ponds accept flow from the transfer lines with all support equipment operating as designed; and the control systems operate and status the 200 Area TEDF including monitoring of appropriate generator discharge parameters

  9. Test validation of nuclear and fossil fuel control operators

    International Nuclear Information System (INIS)

    Moffie, D.J.

    1976-01-01

    To establish job relatedness, one must go through a procedure of concurrent and predictive validation. For concurrent validity a group of employees is tested and the test scores are related to performance concurrently or during the same time period. For predictive validity, individuals are tested but the results of these tests are not used at the time of employment. The tests are sealed and scored at a later date, and then related to job performance. Job performance data include ratings by supervisors, actual job performance indices, turnover, absenteeism, progress in training, etc. The testing guidelines also stipulate that content and construct validity can be used

  10. Study on operation I and C DCS test method of EPR project

    International Nuclear Information System (INIS)

    Meng Ying; Lv Zhihong; Huang Xinnian; Fan Haiying; Li Zhuojia; Xiao Shushu

    2014-01-01

    Through summarization and optimization of the method for operation I and C DCS test of the European pressurized reactor project, the conclusions play a guiding role on the operation I and C DCS test of the domestic advanced nuclear power plant. The study of the method focuses on the test platform, the test process and the optimization of method of operation I and C DCS test with the practical experience. The reasonable and reliable test method for operation I and C DCS test of the European pressurized reactor project is worthy of the reference and the development in the project of the domestic advanced nuclear power plant. (authors)

  11. Modal Testing of Mechanical Structures Subject to Operational Excitation Forces

    DEFF Research Database (Denmark)

    Møller, N.; Brincker, Rune; Herlufsen, H.

    2000-01-01

    to the Operational Modal Analysis. For Operational Modal Analysis two different estimation techniques are used: a non-parametric technique based on Frequency Domain Decomposition (FDD), and a parametric technique working on the raw data in time domain, a data driven Stochastic Subspace Identification (SSI) algorithm......Operational Modal Analysis also known as Output Only Modal Analysis has in the recent years been used for extracting modal parameters of civil engineering structures and is now becoming popular for mechanical structures. The advantage of the method is that no artificial excitation need...

  12. The tokamak fusion test reactor tritium systems test contractor operational readiness review

    International Nuclear Information System (INIS)

    Gentile, C.A.; Levine, J.; Norris, M.; Rehill, F.; Such, C.

    1993-01-01

    In preparation for D-T operations at TFTR, the TFTR project has successfully completed the C-ORR process which has led to the introduction of 200 curies of tritium to the site. Preparations for the C-ORR began approximately 2 years ago. During July 1992 a one-week Site Assistance Review was conducted by the C-ORR , and C-ORR Team consisting of 12 persons, all of whom were outside experts, many of whom were from other facilities within the DOE complex. During the July 1992 Site Assistance Review 201 findings were documented which fell into one of three categories. All of the 109 category one findings which were generated were required to be resolved prior to the introduction of tritium to the TFTR site. On April 5, 1993, the TFTR Tritium System Test C-ORR commenced. The results of the C-ORR as documented in the final report by the C-ORR was that category 1 findings were resolved, and it was the recommendation of the C-ORR Team to the PPPL ES ampersand H Board that TFTR initiate the Tritium Systems Test. DOE (Chicago Operations, Princeton Area Office) concurred with the C-ORR final report and on April 29, 1993, at 12:15 pm tritium was introduced to the TFTR site

  13. Operability test report for 211BA flow proportional sampler

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1995-01-01

    This operability report will verify that the 211-BA flow proportional sampler functions as intended by design. The sampler was installed by Project W-007H and is part of BAT/AKART for the BCE liquid effluent stream

  14. Analysis of Soldier Radio Waveform Performance in Operational Test

    Science.gov (United States)

    2015-05-01

    different frequencies based on carrier, uplink/downlink, and generation. In general, 2G and 3G cellular phones operate at 850 MHz uplink, and 1,900 MHz...spectrum management that may not be operationally feasible. These issues are not unique to SRW, but rather have plagued the mobile ad-hoc network... mobile ad-hoc network (MANET), enabling communication through a self-configuring, infrastructure-less network of mobile nodes. In the SS domain, these

  15. Magnetic heat pump flow director

    Science.gov (United States)

    Howard, Frank S. (Inventor)

    1995-01-01

    A fluid flow director is disclosed. The director comprises a handle body and combed-teeth extending from one side of the body. The body can be formed of a clear plastic such as acrylic. The director can be used with heat exchangers such as a magnetic heat pump and can minimize the undesired mixing of fluid flows. The types of heat exchangers can encompass both heat pumps and refrigerators. The director can adjust the fluid flow of liquid or gas along desired flow directions. A method of applying the flow director within a magnetic heat pump application is also disclosed where the comb-teeth portions of the director are inserted into the fluid flow paths of the heat pump.

  16. Defining and Selecting Independent Directors

    Directory of Open Access Journals (Sweden)

    Eric Pichet

    2017-10-01

    Full Text Available Drawing from the Enlightened Shareholder Theory that the author first developed in 2011, this theoretical paper with practical and normative ambitions achieves a better definition of independent director, while improving the understanding of the roles he fulfils on boards of directors. The first part defines constructs like firms, Governance system and Corporate governance, offering a clear distinction between the latter two concepts before explaining the four main missions of a board. The second part defines the ideal independent director by outlining the objective qualities that are necessary and adding those subjective aspects that have turned this into a veritable profession. The third part defines the ideal process for selecting independent directors, based on nominating committees that should themselves be independent. It also includes ways of assessing directors who are currently in function, as well as modalities for renewing their mandates. The paper’s conclusion presents the Paradox of the Independent Director.

  17. PBF/LOFT Lead Rod Test Program experiment operating specification

    International Nuclear Information System (INIS)

    Varacalle, D.J. Jr.

    1978-11-01

    The PBF/LOFT Lead Rod (LLR) Test Program is being conducted to provide experimental information on the behavior of nuclear fuel under normal and accident conditions in the Power Burst Facility at the Idaho National Engineering Laboratory. Understanding the behavior of light-water reactors (LWR) under loss-of-coolant conditions is a major objective of the NRC Reactor Safety Research Program. The Loss of Fluid Test (LOFT) facility is the major testing facility to evaluate the systems response of an LWR over a wide range of Loss of Coolant Experment (LOCE) conditions. As such, the LOFT core is intended to be used for sequential LOCE tests provided no significant fuel rod failures occur. The PFB/LLR tests are designed to simulate the test conditions for the LOFT Power Ascension Tests L2-2 through L2-5. The test program has been designed to provide a parametric evaluation of the LOFT fuel over a wide range of power. Thus, a relatively accurate assessment of the state of the LOFT core after the completion of each subtest and the anticipated effect of the next test can be obtained by utilizing a combination of LLR test data and analytical predictions. Specifications for the test program are presented

  18. 22 CFR 67.2 - Board of Directors.

    Science.gov (United States)

    2010-04-01

    ..., Washington, DC 20005-5000. (b) All major policy and funding decisions are made by the Board of Directors. The primary statement of NED's operating philosophy, general principles and priorities is contained in the...

  19. Application of signature analysis for determining the operational readiness of motor-operated valves under blowdown test conditions

    International Nuclear Information System (INIS)

    Haynes, H.D.

    1990-01-01

    In support of the NRC-funded Nuclear Plant Aging Research (NPAR) program, Oak Ridge National Laboratory (ORNL) has carried out a comprehensive aging assessment of motor-operated valves (MOVs). As part of this work, ORNL participated in the gate valve flow interrruption blowdown (GVFIB) tests carried out in Huntsville, Alabama. The tests provided an excellent opportunity to evaluate signature analysis methods for determining the operability of MOVs under accident conditions. ORNL acquired motor current and torque switch shaft angular position signatures on two test MOVs during several GVFIB tests. The reduction in operating ''margin'' of both MOVs due to the presence of additional valve running loads imposed by high flow was clearly observed in motor current and torque switch angular position signatures. In addition, the effects of differential pressure, fluid temperature, and line voltage on MOV operations were observed and more clearly understood as a result of utilizing the signature analysis techniques. (orig.)

  20. Professional penetration testing creating and operating a formal hacking lab

    CERN Document Server

    Wilhelm, Thomas

    2009-01-01

    PART I - Setting Up. Chapter 1: Introduction. Chapter 2: Ethics and Hacking. Chapter 3: Hacking as a Career. Chapter 4: Setting up Your Lab. Chapter 5: Creating and Using PenTest Targets in Your Lab. Chapter 6: Methodologies. Chapter 7: PenTest Metrics. Chapter 8: Management of a PenTest. PART II - Running a PenTest. Chapter 9: Information Gathering. Chapter 10: Vulnerability Identification. Chapter 11: Vulnerability Verification. Chapter 12: Compromising a System and Privilege Escalation. Chapter 13: Maintaining Access. Chapter 14: Covering Your Tracks. PART III - Wrapping Everything Up. Chap

  1. Apollo-Soyuz test project. Operations handbook command/service/docking modules (CSM 119/DM 1): Operational procedures reference issue

    Science.gov (United States)

    1974-01-01

    Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.

  2. Operational status of the Brookhaven National Laboratory Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Fernow, R.C.; Fischer, A.S.; Gallardo, J.; Jialin, Xie; Kirk, H.G.; Malone, R.G.; Parsa, Z.; Palmer, R.B.; Rao, T.; Rogers, J.; Sheehan, J.; Tsang, T.Y.F.; Ulc, S.; van Steenbergen, A.; Woodle, M.; Zhang, R.S.; Bigio, I.; Kurnit, N.; Shimada, T.; McDonald, K.T.; Russel, D.P.; Jiang, Z.Y.; Pellegrini, C.; Wang, X.J.

    1990-01-01

    Initial design parameters and early operational results of a 50 MeV high brightness electron linear accelerator are described. The system utilizes a radio frequency electron gun operating at a frequency of 2.856 GHz and a nominal output energy of 4.5 MeV followed by two, 2π/3 mode, disc loaded, traveling wave accelerating sections. The gun cathode is photo excited with short (6 psec) laser pulses giving design peak currents of a few hundred amperes. The system will be utilized to carry out infra-red FEL studies and investigation of new high gradient accelerating structures

  3. Modal Testing of Mechanical Structures subject to Operational Excitation Forces

    DEFF Research Database (Denmark)

    Møller, N.; Brincker, Rune; Herlufsen, H.

    2001-01-01

    Operational Modal Analysis also known as Output Only Modal Analysis has in the recent years been used for extracting modal parameters of civil engineering structures and is now becoming popular for mechanical structures. The advantage of the method is that no artificial excitation need to be appl......Operational Modal Analysis also known as Output Only Modal Analysis has in the recent years been used for extracting modal parameters of civil engineering structures and is now becoming popular for mechanical structures. The advantage of the method is that no artificial excitation need...

  4. Director ownership, outside directors and commitment to corporate social responsibility

    Directory of Open Access Journals (Sweden)

    Chen Ying

    2011-01-01

    Full Text Available This paper examines the effects of director ownership and the proportion of outside directors on firms’ commitment to corporate social responsibility (CSR. Using a sample of 453 Hong Kong listed companies for 2005, we find that there is a non-linear relationship between the level of director ownership and firms’ engagement in CSR behavior. Commitment to CSR first increases as the proportion of director ownership increases up to 50% and then decreases as that proportion of ownership grows higher. Further, the proportion of outside directors on the board exhibits a positive relationship with the level of CSR commitment. These results provide explanations for firms’ commitment to CSR from the corporate governance perspective.

  5. Modification and Performance Evaluation of a Low Cost Electro-Mechanically Operated Creep Testing Machine

    OpenAIRE

    John J. MOMOH; Lanre Y. SHUAIB-BABATA; Gabriel O. ADELEGAN

    2010-01-01

    Existing mechanically operated tensile and creep testing machine was modified to a low cost, electro-mechanically operated creep testing machine capable of determining the creep properties of aluminum, lead and thermoplastic materials as a function of applied stress, time and temperature. The modification of the testing machine was necessitated by having an electro-mechanically operated creep testing machine as a demonstration model ideal for use and laboratory demonstrations, which will prov...

  6. Zirconium Recycle Test Equipment for Hot Cell Operations

    International Nuclear Information System (INIS)

    Collins, Emory D.; DelCul, Guillermo Daniel; Spencer, Barry B.; Bradley, Eric Craig; Brunson, Ronald Ray

    2015-01-01

    The equipment components and assembly support work were modified for optimized, remote hot cell operations to complete this milestone. The modifications include installation of a charging door, Swagelok connector for the off-gas line between the reactor and condenser, and slide valve installation to permit attachment/replacement of the product salt collector bottle.

  7. 78 FR 54510 - New Entrant Safety Assurance Program Operational Test

    Science.gov (United States)

    2013-09-04

    ... safety management controls; (2) consider their effects on small businesses; and (3) consider establishing alternate locations where such reviews may be conducted for the convenience of small businesses. In response... safety review within 18 months of starting interstate operations. [49 U.S.C. 31144(g)]. In issuing these...

  8. 46 CFR 160.066-12 - Operational tests.

    Science.gov (United States)

    2010-10-01

    ... provided by a sealed plastic bag or other waterproof packaging, submersion under 25 mm (1 in.) of water for... operating instructions. The following data as observed must be recorded for each signal: (1) Burning time of the pyrotechnic candle; (2) Color; (3) Whether the pyrotechnic candle burns out above, at, or below...

  9. 42 CFR 84.145 - Motor-operated blower test; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Motor-operated blower test; minimum requirements... Supplied-Air Respirators § 84.145 Motor-operated blower test; minimum requirements. (a) Motor-operated... connection between the motor and the blower shall be so constructed that the motor may be disengaged from the...

  10. An introduction to testing techniques in the Intelsat TDMA/DSI system. II - Satellite system operations guide (SSOG) tests

    Science.gov (United States)

    Colby, R. J.; Parthasarathy, R.; Stimson, A. L.

    1983-12-01

    The test methods and procedures of the Intelsat TDMA/DSI SSOG are summarized. The overall structure of the SSOG is outlined, and the operational procedures to be followed for joining a new terminal to the system and for normal operations are reviewed, with an emphasis on the roles of the IOC and the TDMA reference and monitoring stations. The testing philosophy (based on minimal interruptions) and the star-test method are explained and illustrated with diagrams, and the test procedures are examined, including modem tests, electrical-path-length equalization, RF/IF downchain tests, protocol tests, nontransmitting protocol tests, IF/RF upchain tests, transmitting protocol tests, baseband tests, and orderwire lineups. The fundamental access discipline of the TDMA system is presented in an appendix.

  11. Systematization of Angra-1 operation attendance - Maintenance and periodic testings

    International Nuclear Information System (INIS)

    Furieri, E.B.; Carvalho Bruno, N. de; Salaverry, N.A.

    1988-01-01

    A maintenance analysis, their types and their functions for the safety of nuclear power plants is done. Programs and present trends in the reactor maintenance, as well as the maintenance program and periodic tests of Angra I, are analysed. The necessities of safety analysis and a systematization for maintenance attendance are discussed and the periodic testing as well as the attendance of international experience. (M.C.K.) [pt

  12. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  13. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  14. Demonstration test operation of Feed Materials Production Center Biodenitrification Facility

    International Nuclear Information System (INIS)

    Benear, A.K.; Patton, J.B.

    1987-01-01

    A fluidized-bed biological denitrification (BDN) system was used to treat high-nitrate wastewater streams from a DOE owned uranium processing plant. A two-column system was used to demonstrate BDN operation on a production scale. In a continuous 200 hour rate determination period, the BDN processed over 1.6 million gallons that contained over 4700 kilograms of nitrate and nitrite nitrogen. The BDN removed an average 97% of the incoming nitrate and nitrite. The BDN effluent was discharged to the FMPC sewage treatment plant where it caused increased levels of TOD, TSS and fecal coliforms in the STP discharge. This indicated the BDN effluent will require treatment prior to discharge to the environment. Preliminary chemical consumption rates and associated costs of operation were determined. Several modifications and additions to the system were identified as necessary for the permanent production facility. 3 refs., 11 figs., 2 tabs

  15. Multi-Center Traffic Management Advisor Operational Field Test Results

    Science.gov (United States)

    Farley, Todd; Landry, Steven J.; Hoang, Ty; Nickelson, Monicarol; Levin, Kerry M.; Rowe, Dennis W.

    2005-01-01

    The Multi-Center Traffic Management Advisor (McTMA) is a research prototype system which seeks to bring time-based metering into the mainstream of air traffic control (ATC) operations. Time-based metering is an efficient alternative to traditional air traffic management techniques such as distance-based spacing (miles-in-trail spacing) and managed arrival reservoirs (airborne holding). While time-based metering has demonstrated significant benefit in terms of arrival throughput and arrival delay, its use to date has been limited to arrival operations at just nine airports nationally. Wide-scale adoption of time-based metering has been hampered, in part, by the limited scalability of metering automation. In order to realize the full spectrum of efficiency benefits possible with time-based metering, a much more modular, scalable time-based metering capability is required. With its distributed metering architecture, multi-center TMA offers such a capability.

  16. IAEA Director General welcomes NPT consensus

    International Nuclear Information System (INIS)

    2000-01-01

    The document informs that the Director General of the IAEA welcomed the adoption with consensus by the Review Conference of the Parties to the Treaty on the Non-Proliferation of Nuclear Weapons of the final document on the review and operation of the Treaty, and that he was pleased by the vote of confidence shown in the IAEA and its role in the implementation of the Treaty

  17. The Director's Work on Himself

    DEFF Research Database (Denmark)

    Kuhlmann, Annelis

    2008-01-01

    A reading of Stanislavsky's major works about the actor's work on himself from the viewpoint of the director's work on himself.......A reading of Stanislavsky's major works about the actor's work on himself from the viewpoint of the director's work on himself....

  18. IT governance guidelines for directors

    CERN Document Server

    Calder, Alan

    2005-01-01

    This important new book – 'IT Governance: Guidelines for Directors' provides directors, executives, managers and professional advisers with clear, pragmatic guidelines for ensuring that IT and the business work together for the same strategic objectives. 

  19. Three directors for one strategy

    CERN Multimedia

    2009-01-01

    Following the interview with the Director General, Rolf-Dieter Heuer, the Bulletin continues its series of interviews with the members of CERN’s new Management team. This week, the Bulletin interviewed the three Directors, who presented their strategies for their respective sectors as a new era begins for CERN.

  20. Object Oriented Programming in Director

    Directory of Open Access Journals (Sweden)

    Marian DARDALA

    2006-01-01

    Full Text Available Director is one of the most popular authoring software. As software for developing multimedia applications, Director is an object oriented programming environment. A very important issue to develop multimedia applications is the designing of their own classes. This paper presents the particular aspects concerning the available facilities offered by Lingo to design classes and to generate objects.

  1. ICU Director Data

    Science.gov (United States)

    Ogbu, Ogbonna C.; Coopersmith, Craig M.

    2015-01-01

    Improving value within critical care remains a priority because it represents a significant portion of health-care spending, faces high rates of adverse events, and inconsistently delivers evidence-based practices. ICU directors are increasingly required to understand all aspects of the value provided by their units to inform local improvement efforts and relate effectively to external parties. A clear understanding of the overall process of measuring quality and value as well as the strengths, limitations, and potential application of individual metrics is critical to supporting this charge. In this review, we provide a conceptual framework for understanding value metrics, describe an approach to developing a value measurement program, and summarize common metrics to characterize ICU value. We first summarize how ICU value can be represented as a function of outcomes and costs. We expand this equation and relate it to both the classic structure-process-outcome framework for quality assessment and the Institute of Medicine’s six aims of health care. We then describe how ICU leaders can develop their own value measurement process by identifying target areas, selecting appropriate measures, acquiring the necessary data, analyzing the data, and disseminating the findings. Within this measurement process, we summarize common metrics that can be used to characterize ICU value. As health care, in general, and critical care, in particular, changes and data become more available, it is increasingly important for ICU leaders to understand how to effectively acquire, evaluate, and apply data to improve the value of care provided to patients. PMID:25846533

  2. Space Launch System Base Heating Test: Experimental Operations & Results

    Science.gov (United States)

    Dufrene, Aaron; Mehta, Manish; MacLean, Matthew; Seaford, Mark; Holden, Michael

    2016-01-01

    NASA's Space Launch System (SLS) uses four clustered liquid rocket engines along with two solid rocket boosters. The interaction between all six rocket exhaust plumes will produce a complex and severe thermal environment in the base of the vehicle. This work focuses on a recent 2% scale, hot-fire SLS base heating test. These base heating tests are short-duration tests executed with chamber pressures near the full-scale values with gaseous hydrogen/oxygen engines and RSRMV analogous solid propellant motors. The LENS II shock tunnel/Ludwieg tube tunnel was used at or near flight duplicated conditions up to Mach 5. Model development was based on the Space Shuttle base heating tests with several improvements including doubling of the maximum chamber pressures and duplication of freestream conditions. Test methodology and conditions are presented, and base heating results from 76 runs are reported in non-dimensional form. Regions of high heating are identified and comparisons of various configuration and conditions are highlighted. Base pressure and radiometer results are also reported.

  3. Operational tests of a device with an elevator for automated outlet of heat for heating

    Energy Technology Data Exchange (ETDEWEB)

    Zinger, N.M.; Belevich, A.I.; Burd, A.L.; Krivitskiy, V.I.; Lokshin, L.S.

    1983-01-01

    The results are presented of operational tests of series produced jet pumps. The field of use of an automated elevator is determined and recommendations for increasing its operational qualities are given.

  4. Operation of a nuclear test gage at low multiplications

    International Nuclear Information System (INIS)

    Baumann, N.P.

    1977-01-01

    The Nuclear Test Gage (NTG) at the Savannah River Plant is a subcritical multiplying facility (low k) with H 2 O moderator and 2.54-cm-diameter fuel slugs of 5 wt percent 235 U in aluminum alloy at a 4.285-cm triangular pitch. The core of the facility is 61-cm long with a normal diameter of 27 cm. The NTG is used for quality control of reactor components, such as 235 U-Al fuel tubes, Li--Al target tubes, control and safety rods, and miscellaneous special irradiation elements. A component is tested by passing it through an axial test port 11.63 cm in diameter. The ion chamber response from the resultant change in neutron source multiplication is then compared with corresponding responses from known standards

  5. Modal test results of a ship under operational conditions

    DEFF Research Database (Denmark)

    Orlowitz, Esben; Brandt, Anders

    2014-01-01

    Skibe er udsat for et komplekst vibration miljø, påvirket af havet, samt driftsforholdene. Især er det vanskeligt at anslå analytisk værdier for de hydrodynamiske påvirkninger. Eksperimentelle resultater er derfor vigtigt for at kontrollere de analytiske modeller. I den foreliggende artikel præse...... fokuserer på driftsforhold påvirkning af de modal parametre og viser en betydelig variation af modal dæmpning af skibet i drift, med cirka 400%, 200% og 400% forskel i de første tre globale lodrette bøjning modes, ved forskellige operations hastigheder....

  6. Conceptual design of a test facility for the remote handling operations of the ITER Test Blanker Modules

    International Nuclear Information System (INIS)

    Marqueta, A.; Garcia, I.; Gomez, A.; Garcia, L.; Sedano, E.; Fernandez, I.

    2012-01-01

    Conceptual Design of a test facility for the remote handling operations of the ITER Test Blanket Modules. Conditions inside a fusion reactor are incompatible with conventional manual maintenance tasks. the same applies for ancillary equipment. As a consequence, it will become necessary to turn to remote visualization and remote handling techniques, which will have in consideration the extreme conditions, both physical and operating, of ITER. Main goal of the project has been the realization of the conceptual design for the test facility for the Test Blanket Modules of ITER and their associated systems, related to the Remote Handling operations regarding the Port Cell area. Besides the definition of the operations and the specification of the main components and ancillary systems of the TBM graphical simulation have been used for the design, verification and validation of the remote handling operations. (Author)

  7. Application of signature analysis for determining the operational readiness of motor-operated valves under blowdown test conditions

    International Nuclear Information System (INIS)

    Haynes, H.D.

    1988-01-01

    In support of the NRC-funded Nuclear Plant Aging Research (NPAR) program, Oak Ridge National Laboratory (ORNL) has carried out a comprehensive aging assessment of Motor-Operated Valves (MOVs). As part of this work, ORNL participated in the Gate Valve Flow Interruption Blowdown (GVFIB) tests carried out in Huntsville, Alabama. The GVFIB tests were intended primarily to determine the behavior of motor-operated gate valves under the temperature, pressure, and flow conditions expected to be experienced by isolation valves in Boiling Water Reactors (BWRs) during a high energy line break (blowdown) outside of containment. In addition, the tests provided an excellent opportunity to evaluate signature analysis methods for determining the operational readiness of the MOVs under those accident conditions. ORNL acquired motor current and torque switch shaft angular position data on two test MOVs during various times of the GVFIB tests. The reduction in operating ''margin'' of both MOVs due to the presence of additional valve running loads imposed by high flow was clearly observed in motor current and torque switch angular position signatures. In addition, the effects of differential pressure, fluid temperature, and line voltage on MOV operations were observed and more clearly understood as a result of utilizing signature analysis techniques. 1 ref.; 16 figs

  8. A testing apparatus and a method of operating the same

    DEFF Research Database (Denmark)

    2014-01-01

    by other sample holders, and each comprising a first abutment being fixed with respect to the sample holder. The testing apparatus comprises at least one second abutment, and each of the multiple first abutments or the second abutment comprises two separate abutment surfaces. Furthermore either each...... of the multiple first abutments or the second abutment is fixed with respect to the support structure (11), and the testing apparatus further comprises a transport mechanism (7, 12) adapted for relatively moving the other of the multiple first abutments or the second abutment in such a way that each of the first...... abutments on the multiple sample holders sequentially passes the second abutment and so that the two abutment surfaces on either each of the multiple first abutments or the second abutment passes on each side of at least a part of the other abutment....

  9. Testing market informational efficiency of Constanta port operators

    Science.gov (United States)

    Roşca, E.; Popa, M.; Ruscă, F.; Burciu, Ş.

    2015-11-01

    The Romanian capital market is still an emergent one. Following the mass- privatization process and the private investments, three of the most important handling and storage companies acting in Constantza Port (OIL Terminal, Comvex and SOCEP) are listed on Romanian Stock Exchange. The paper investigates their evolution on the market, identifying the expected rate of return and the components of the shares risk (specific and systematic). Also, the price evolution could be analyzed through the informational efficiency which instantly reflects the price relevance. The Jarque-Bera normality test regarding the shares return rate distribution and the Fama test for the informational efficiency are completed for each company. The market price model is taken into consideration for price forecasting, computing the return rate auto-correlations. The results are subject of interpretation considering additional managerial and financial information of the companies’ activity.

  10. Perspectives on Operational Testing: Guest Lecture at Naval Postgraduate School

    Science.gov (United States)

    2017-01-01

    currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) 01-2017 2. REPORT TYPE IDA ...Dean Thomas (OED) a. REPORT Unclassified b . ABSTRACT Unclassified c. THIS PAGE Unclassified Unlimited 19b. TELEPHONE NUMBER (include area...test, and implement design changes that could be retrofitted on to vehicles in theater as well as built into future production lines The Army and

  11. Operation of the graded-β electron test accelerator

    International Nuclear Information System (INIS)

    Fraser, J.S.; McKeown, J.; McMichael, G.E.; Diamond, W.T.

    1976-01-01

    The Electron Test Accelerator has been built to model the behaviour of the high energy portion of a proton linear accelerator which would be suitable for breeding fissile material. The test accelerator and its control systems have been tested at 100% duty factor producing a beam of electrons at 1.5 MeV and currents up to 20 mA where the incident rf power is shared equally between the structure dissipation and the beam loading. The structure has performed satisfactorily in all respects at dissipation power densities up to 5 kW/cell where the mean energy gradient was 1.1 MeV/m. Experiments have been done on the beam loading effects in the coupling of the transmission line to the cavity, the amplitude depression in and phase tilt along the structure, and the phase lag of the structure field. The phase acceptance, the variation of transmission with buncher-accelerator phase shift and the beam energy spread are in qualitative agreement with beam dynamics calculations. (author)

  12. Testing Report: Littleford-Day Dryer Operation: Dryer Operation Impacts of Proposed MIS Mitigation Changes

    Energy Technology Data Exchange (ETDEWEB)

    Shimskey, Rick W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Buchmiller, William C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Elmore, Monte R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-06-01

    Pacific Northwest National Laboratory performed a series of tests using the Littleford Day 22-liter dryer during investigations that evaluated changes in the melter-feed composition for the Demonstration Bulk Vitrification System. During testing, a new melter-feed formulation was developed that improved dryer performance while improving the retention of waste salts in the melter feed during vitrification.

  13. Live Operation Data Collection Optimization and Communication for the Domestic Nuclear Detection Office's Rail Test Center

    International Nuclear Information System (INIS)

    Gelston, Gariann M.

    2010-01-01

    For the Domestic Nuclear Detection Office's Rail Test Center (i.e., DNDO's RTC), port operation knowledge with flexible collection tools and technique are essential in both technology testing design and implementation intended for live operational settings. Increased contextual data, flexibility in procedures, and rapid availability of information are keys to addressing the challenges of optimization, validation, and analysis within live operational setting data collection. These concepts need to be integrated into technology testing designs, data collection, validation, and analysis processes. A modified data collection technique with a two phased live operation test method is proposed.

  14. Hans Blix appointed Director General

    International Nuclear Information System (INIS)

    1981-01-01

    On 1 December 1981, Dr Hans Blix took office as Director General of the International Atomic Energy Agency in succession to Dr Sigvard Eklund who has headed the IAEA since 1961. The Agency's Board of Governors nominated Dr Blix by acclamation on 26 September. His appointment was unanimously approved by the final session of the 25th regular session of the General Conference of the IAEA the same day. The President of the Conference, Ambassador Manaspas Xuto, administered the oath of office to Dr Blix at the final plenary meeting that day. Hans Blix was born in 1928 in Uppsala He studied at the University of Uppsala, at Columbia University, where he was also a research graduate and at Cambridge, where he received his Ph D In 1959 he became Doctor of Laws at the Stockholm University and in 1960 was appointed associate professor in international law. From 1963 to 1976 Dr Blix was Head of Department at the Ministry for Foreign Affairs and served as Legal Adviser on International Law. In 1976 he became Undersecretary of State at the Ministry for Foreign Affairs in charge of international development co-operation He was appointed Minister for Foreign Affairs in October 1978 In September 1979 he was again appointed Undersecretary of State at the Ministry for Foreign Affairs in charge of international development co-operation. Since 1961 he has been a member of Sweden's delegation to the United Nations General Assembly, and from 1962 to 1978 a member of the Swedish delegation to the Conference on Disarmament in Geneva. He has written several books on subjects associated with international and constitutional law and was leader of the Liberal Campaign Committee in favour of retention of the Swedish nuclear energy program in the referendum in 1980

  15. Ten years of cryo-magnetic W7-X test facility construction and operation

    International Nuclear Information System (INIS)

    Renard, B.; Dispau, G.; Donati, A.; Genini, L.; Gournay, J.F.; Kuster, O.; Molinie, F.; Schild, T.; Touzery, R.; Vieillard, L.; Walter, C.

    2011-01-01

    The construction, commissioning, and operation phases of the W7-X cryo-magnetic test facility in CEA Saclay lasted ten years. The large diversity of equipments called, specialties involved and problems solved attest the expertise that was required to operate the test facility and test the coils. Nearly one hundred cryogenic tests were performed on the seventy W7-X coils, at a rate always increasing, using two cryostats each holding two coils. This paper presents the test facility and its operation first, the cryogenic difficulties that were confronted with their solutions, the electro-magnetic difficulties encountered along with corrective actions, and finally the instrumentation and data acquisition aspects. (authors)

  16. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    Science.gov (United States)

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  17. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    Science.gov (United States)

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  18. DAS: A Data Management System for Instrument Tests and Operations

    Science.gov (United States)

    Frailis, M.; Sartor, S.; Zacchei, A.; Lodi, M.; Cirami, R.; Pasian, F.; Trifoglio, M.; Bulgarelli, A.; Gianotti, F.; Franceschi, E.; Nicastro, L.; Conforti, V.; Zoli, A.; Smart, R.; Morbidelli, R.; Dadina, M.

    2014-05-01

    The Data Access System (DAS) is a and data management software system, providing a reusable solution for the storage of data acquired both from telescopes and auxiliary data sources during the instrument development phases and operations. It is part of the Customizable Instrument WorkStation system (CIWS-FW), a framework for the storage, processing and quick-look at the data acquired from scientific instruments. The DAS provides a data access layer mainly targeted to software applications: quick-look displays, pre-processing pipelines and scientific workflows. It is logically organized in three main components: an intuitive and compact Data Definition Language (DAS DDL) in XML format, aimed for user-defined data types; an Application Programming Interface (DAS API), automatically adding classes and methods supporting the DDL data types, and providing an object-oriented query language; a data management component, which maps the metadata of the DDL data types in a relational Data Base Management System (DBMS), and stores the data in a shared (network) file system. With the DAS DDL, developers define the data model for a particular project, specifying for each data type the metadata attributes, the data format and layout (if applicable), and named references to related or aggregated data types. Together with the DDL user-defined data types, the DAS API acts as the only interface to store, query and retrieve the metadata and data in the DAS system, providing both an abstract interface and a data model specific one in C, C++ and Python. The mapping of metadata in the back-end database is automatic and supports several relational DBMSs, including MySQL, Oracle and PostgreSQL.

  19. Auditor’s Risk Assessment of Independent Directors in Nigeria

    Directory of Open Access Journals (Sweden)

    Salau Abdulmalik

    2017-01-01

    Full Text Available The objective of this study is to investigate the external auditor’s risk assessment of independent directors in Nigeria. The study utilized data from 94 non-financial listed companies on the Nigerian Stock Exchange for the periods 2008-2013. The study used cross-sectional time-series feasible generalized least square regression, which account for heteroscedasticity and autocorrelation to test the influence independent non-executive director on auditor pricing decision in Nigeria. Our result indicates that the proportion of independent non-executive director has a positive relationship with audit fees, suggesting that this class of directors is priced high by the Nigerian auditors. These findings have both policy and practical implication on corporate governance. For instance, future regulatory reforms could consider collaborative board model instead of the insistence on more independent director presence in the boardroom.

  20. Boards: Independent and Committed Directors?

    OpenAIRE

    Christophe Volonté

    2011-01-01

    Regulators, proxy advisors and shareholders are regularly calling for independent directors. However, at the same time, independent directors commonly engage in numerous outside activities potentially reducing their time and commitment with the particular firm. Using Tobin's Q as an approximation of market valuation and controlling for endogeneity, our empirical analysis reveals that neither is independence positively related to firm performance nor are outside activities negatively related t...

  1. Enhanced operator-training simulator for the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Schrader, F.D.; Swanson, C.D.

    1983-01-01

    The FFTF Plant Operator Training Simulator Facility has proven to be a valuable asset throughtout the testing, startup and early operational phases of the Fast Flux Test facility. However, limitations inherent in the existing simulation facility, increased emphasis on the required quality of operator training, and an expanded scope of applications (e.g., MNI development) justify an enhanced facility. Direct use of plant operators in the development of improved reactor control room displays and other man/machine interface equipment and procedures increases the credibility of proposed techniques and reported results. The FFTF Plant Operator Training Simulator provides a key element in this development program

  2. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Door design, operation, installation, and testing. 170..., operation, installation, and testing. (a) Each Class 1 door must have a quick action closing device... the welding process so that the door frame is not distorted. (e) For each watertight door which is in...

  3. Operability test report for core sample truck number one flammable gas modifications

    International Nuclear Information System (INIS)

    Akers, J.C.

    1997-01-01

    This report primarily consists of the original test procedure used for the Operability Testing of the flammable gas modifications to Core Sample Truck No. One. Included are exceptions, resolutions, comments, and test results. This report consists of the original, completed, test procedure used for the Operability Testing of the flammable gas modifications to the Push Mode Core Sample Truck No. 1. Prior to the Acceptance/Operability test the truck No. 1 operations procedure (TO-080-503) was revised to be more consistent with the other core sample truck procedures and to include operational steps/instructions for the SR weather cover pressurization system. A draft copy of the operations procedure was used to perform the Operability Test Procedure (OTP). A Document Acceptance Review Form is included with this report (last page) indicating the draft status of the operations procedure during the OTP. During the OTP 11 test exceptions were encountered. Of these exceptions four were determined to affect Acceptance Criteria as listed in the OTP, Section 4.7 ACCEPTANCE CRITERIA

  4. Operational test for photovoltaic pumping systems; Procedimento para averiguacao operacional de sistemas fotovoltaicos de bombeamento

    Energy Technology Data Exchange (ETDEWEB)

    Fedrizzi, Maria Cristina; Brito, Alaan Ubaiara; Zilles, Roberto [Universidade de Sao Paulo (USP), SP (Brazil). Inst. de Eletrotecnica e Energia. Lab. de Sistemas Fotovoltaicos], e-mail: fedrizzi@iee.usp.br, e-mail: alaan@iee.usp.br, e-mail: zilles@iee.usp.br

    2004-07-01

    This paper presents an operational test for photovoltaic pumping systems daily production, m{sup 3}/dia. The procedure does not involve expensive instrumentation and is easy to be applied in the field as acceptance and qualification tools. In this way, the paper presents the boundary conditions for operational test accomplishment that allows its application. (author)

  5. 76 FR 34145 - Safety Zone, Barrier Testing Operations, Chicago Sanitary and Ship Canal, Romeoville, IL

    Science.gov (United States)

    2011-06-13

    ...-AA00 Safety Zone, Barrier Testing Operations, Chicago Sanitary and Ship Canal, Romeoville, IL AGENCY.... Construction on Barrier IIB has been completed. Operational and safety testing was conducted in February 2011... dispersal barrier IIA and IIB. This safety zone will be enforced daily from 7 a.m. to 11 a.m. and from 1 p.m...

  6. Test Operation Procedure (TOP) 01-1-010A Vehicle Test Course Severity (Surface Roughness)

    Science.gov (United States)

    2017-12-12

    Increases in roughness may signify the need to change course maintenance patterns. For example, secondary gravel roads at YTC go through a cycle of...CSTE-DTC-AT-AD) U.S. Army Aberdeen Test Center 400 Colleran Road Aberdeen Proving Ground, MD 21005-5059 8. PERFORMING ORGANIZATION REPORT...test courses at ATEC Test Centers. 15. SUBJECT TERMS Automotive test course Roughness of roads Wave number spectrum Test course surface roughness

  7. Test Rack Development for Extended Operation of Advanced Stirling Convertors at NASA Glenn Research Center

    Science.gov (United States)

    Dugala, Gina M.

    2010-01-01

    The U.S. Department of Energy, Lockheed Martin Space Systems Company, Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of free-piston Stirling convertors to achieve higher conversion efficiency than with currently available alternatives. One part of NASA GRC's support of ASRG development includes extended operation testing of Advanced Stirling Convertors (ASCs) developed by Sunpower Inc. and GRC. The ASC consists of a free-piston Stirling engine integrated with a linear alternator. NASA GRC has been building test facilities to support extended operation of the ASCs for several years. Operation of the convertors in the test facility provides convertor performance data over an extended period of time. One part of the test facility is the test rack, which provides a means for data collection, convertor control, and safe operation. Over the years, the test rack requirements have changed. The initial ASC test rack utilized an alternating-current (AC) bus for convertor control; the ASRG Engineering Unit (EU) test rack can operate with AC bus control or with an ASC Control Unit (ACU). A new test rack is being developed to support extended operation of the ASC-E2s with higher standards of documentation, component selection, and assembly practices. This paper discusses the differences among the ASC, ASRG EU, and ASC-E2 test racks.

  8. Mission control team structure and operational lessons learned from the 2009 and 2010 NASA desert RATS simulated lunar exploration field tests

    Science.gov (United States)

    Bell, Ernest R.; Badillo, Victor; Coan, David; Johnson, Kieth; Ney, Zane; Rosenbaum, Megan; Smart, Tifanie; Stone, Jeffry; Stueber, Ronald; Welsh, Daren; Guirgis, Peggy; Looper, Chris; McDaniel, Randall

    2013-10-01

    The NASA Desert Research and Technology Studies (Desert RATS) is an annual field test of advanced concepts, prototype hardware, and potential modes of operation to be used on human planetary surface space exploration missions. For the 2009 and 2010 NASA Desert RATS field tests, various engineering concepts and operational exercises were incorporated into mission timelines with the focus of the majority of daily operations being on simulated lunar geological field operations and executed in a manner similar to current Space Shuttle and International Space Station missions. The field test for 2009 involved a two week lunar exploration simulation utilizing a two-man rover. The 2010 Desert RATS field test took this two week simulation further by incorporating a second two-man rover working in tandem with the 2009 rover, as well as including docked operations with a Pressurized Excursion Module (PEM). Personnel for the field test included the crew, a mission management team, engineering teams, a science team, and the mission operations team. The mission operations team served as the core of the Desert RATS mission control team and included certified NASA Mission Operations Directorate (MOD) flight controllers, former flight controllers, and astronaut personnel. The backgrounds of the flight controllers were in the areas of Extravehicular Activity (EVA), onboard mechanical systems and maintenance, robotics, timeline planning (OpsPlan), and spacecraft communicator (Capcom). With the simulated EVA operations, mechanized operations (the rover), and expectations of replanning, these flight control disciplines were especially well suited for the execution of the 2009 and 2010 Desert RATS field tests. The inclusion of an operations team has provided the added benefit of giving NASA mission operations flight control personnel the opportunity to begin examining operational mission control techniques, team compositions, and mission scenarios. This also gave the mission operations

  9. Low-level wastewater treatment facility process control operational test report

    International Nuclear Information System (INIS)

    Bergquist, G.G.

    1996-01-01

    This test report documents the results obtained while conducting operational testing of a new TK 102 level controller and total outflow integrator added to the NHCON software that controls the Low-Level Wastewater Treatment Facility (LLWTF). The test was performed with WHC-SD-CP-OTP 154, PFP Low-Level Wastewater Treatment Facility Process Control Operational Test. A complete test copy is included in appendix A. The new TK 102 level controller provides a signal, hereafter referred to its cascade mode, to the treatment train flow controller which enables the water treatment process to run for long periods without continuous operator monitoring. The test successfully demonstrated the functionality of the new controller under standard and abnormal conditions expected from the LLWTF operation. In addition, a flow totalizer is now displayed on the LLWTF outlet MICON screen which tallies the process output in gallons. This feature substantially improves the ability to retrieve daily process volumes for maintaining accurate material balances

  10. 2011 Computation Directorate Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Crawford, D L

    2012-04-11

    From its founding in 1952 until today, Lawrence Livermore National Laboratory (LLNL) has made significant strategic investments to develop high performance computing (HPC) and its application to national security and basic science. Now, 60 years later, the Computation Directorate and its myriad resources and capabilities have become a key enabler for LLNL programs and an integral part of the effort to support our nation's nuclear deterrent and, more broadly, national security. In addition, the technological innovation HPC makes possible is seen as vital to the nation's economic vitality. LLNL, along with other national laboratories, is working to make supercomputing capabilities and expertise available to industry to boost the nation's global competitiveness. LLNL is on the brink of an exciting milestone with the 2012 deployment of Sequoia, the National Nuclear Security Administration's (NNSA's) 20-petaFLOP/s resource that will apply uncertainty quantification to weapons science. Sequoia will bring LLNL's total computing power to more than 23 petaFLOP/s-all brought to bear on basic science and national security needs. The computing systems at LLNL provide game-changing capabilities. Sequoia and other next-generation platforms will enable predictive simulation in the coming decade and leverage industry trends, such as massively parallel and multicore processors, to run petascale applications. Efficient petascale computing necessitates refining accuracy in materials property data, improving models for known physical processes, identifying and then modeling for missing physics, quantifying uncertainty, and enhancing the performance of complex models and algorithms in macroscale simulation codes. Nearly 15 years ago, NNSA's Accelerated Strategic Computing Initiative (ASCI), now called the Advanced Simulation and Computing (ASC) Program, was the critical element needed to shift from test-based confidence to science-based confidence

  11. Operation of the cryogenic system for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Chronis, W.C.; Slack, D.S.

    1987-01-01

    The cryogenic system for the Mirror Fusion Test Facility (MFTF) at Lawrence Livermore National Laboratory (LLNL) was designed to cool the entire MFTF-B system from ambient to operating temperature in less than 10 days. The system was successfully operated in the recent plant and capital equipment (PACE) acceptance tests, and results from these tests helped us correct problem areas and improve the system

  12. Test Operations Procedure (TOP) 01-1-025 Camouflage Performance Testing Using Observers

    Science.gov (United States)

    2016-05-05

    one observer approaching the test article at a time, but these tests are time consuming and expensive to execute for collection of statistically...best data collection approach is live in the field using only one observer for each trial run but these tests are extremely time consuming and...with viewing angle, relative to the ground plane of the observation should be considered in the test design. The impact of aspect angle, such as

  13. Ammunition Peculiar Equipment (APE) 1995, NIR Propellant Analyzer, to MIL-STD-398, Military Standard Shields, Operational for Ammunition Operations, Criteria for Design of and Tests for Acceptance

    National Research Council Canada - National Science Library

    2003-01-01

    ... (SJMAC-DEM) to test the Ammunition Peculiar Equipment (APE) 1995 NIR Propellant Analyzer, to MIL-STD-398, "Military Standard Shields, Operational for Ammunition Operations, Criteria for Design of and Tests for Acceptance...

  14. Development of OSSA(Operation Service Support Agreement) Simulator and Site Acceptance Test

    Energy Technology Data Exchange (ETDEWEB)

    Park, DaeSeung; Ahn, Sung-Jin; Lee, Jong-Beom [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Building the nuclear power plant is on the schedule, remaining question is who could operate the NPP after the construction is finished. OSSA is known as Operation Service Support Agreement, it is the contract between KHNP(Korea Hydro and Nuclear Power Co.,) and ENEC(Emirates Nuclear Energy Corporation) for United Arab Emirates Nuclear Power Plant operations support. The contract is mostly about the safety and reliability operations and as well as of the training of UAE operators to have better experiences. UAE operators needed to be trained and tested before they come to UAE for operate the NPP. The OSSA simulator was built because operator shall not make any mistakes even if the plant is not yet constructed. Simulator Training is a key for getting experiences without operating the actual plant, because the nuclear power plant never used as the test in real situations. Operators’ requirement is to have more than 2 years at site experiences and also they have to be trained 5 to 8 months of the training. The experience such as the site acceptance test will lead the future nuclear industry to meet the global standard and to lead the safety of the NPP. Under the OSSA agreement 400 KHNP experts will support the operations. Most of the operators were trained at the OSSA simulator which is most reliable simulator that can demonstrate satisfactory performance for the simulator.

  15. Hydrologic resources management program and underground test area operable unit fy 1997

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  16. Operability test report for rotary mode core sampling system number 3

    International Nuclear Information System (INIS)

    Corbett, J.E.

    1996-01-01

    This report documents the successful completion of operability testing for the Rotary Mode Core Sampling (RMCS) system number-sign 3. The Report includes the test procedure (WHC-SD-WM-OTP-174), exception resolutions, data sheets, and a test report summary

  17. Operation SANDSTONE. Nuclear Explosions 1948, Scientific Director’s Report of Atomic Weapon Tests. Annex 9, Parts 1, 2, 3, 4 and 5. Contamination Studies

    Science.gov (United States)

    1949-01-01

    EVALUATION OF DUSTS WITR THE CASCADE IMPACTO R . 35 Enclosure A - Directive . . . • . * .• • 45 Enclosure B- Tables , * @ * o e * o * o e o * 47...e o 43 vie CONCTMIICHS. a 0 * , * 0 0 0 0 0 f . . . 4 3 V116 RECOMW TIC •L$ & 0 0 * 0 1+ •••• 3 ENCLOSURE A - Direotives fer Installing Imaetct

  18. Use of a valve operation test and evaluation system to enhance valve reliability

    International Nuclear Information System (INIS)

    Lowry, D.A.

    1990-01-01

    Power plant owners have emphasized the need for assuring safe, reliable operation of valves. While most valves must simply open or close, the mechanisms involved can be quite complex. Motor operated valves (MOVs) must be properly adjusted to assure operability. Individual operator components determine the performance of the entire MOV. Failure in MOVs could cripple or shut down a unit. Thus, a complete valve program consisting of design reviews, operational testing, and preventive and predictive maintenance activities will enhance an owner's confidence level that his valves win operate as expected. Liberty's Valve Operation Test and Evaluation System (VOTES) accurately measures stein thrust without intruding on valve operation. Since mounting a strain gage to a valve stem is a desirable but impractical way of obtaining precise stem thrust, Liberty developed a method to obtain identical data by placing a strain gage sensor on the valve yoke. VOTES provides information which effectively eliminates costly, unscheduled downtime. This paper presents the results of infield VOTES testing. The system's proven ability to identify and characterize actuator and valve performance is demonstrated. Specific topics of discussion include the ability of VOTES to ease a utility's IE Bulletin 8543 concerns and conclusively diagnose MOV components. Data from static and differential pressure testing are presented. Technical, operational, and financial advantages resulting from VOTES technology are explored in detail

  19. 1 April 2011 - Croatian Rudjer Boskovic Institute (RBI)Director-General D. Ramljak visiting CMS Control Centre in Meyrin with Collaboration Spokesperson G. Tonelli; signing the guest book with Head of International Relations F. Pauss and visiting LHC superconducting magnet test hall with L. Walckiers.

    CERN Multimedia

    Maximilien brice

    2011-01-01

    1 April 2011 - Croatian Rudjer Boskovic Institute (RBI)Director-General D. Ramljak visiting CMS Control Centre in Meyrin with Collaboration Spokesperson G. Tonelli; signing the guest book with Head of International Relations F. Pauss and visiting LHC superconducting magnet test hall with L. Walckiers.

  20. William Brinkman (centre), Director of the Department of Energy, U.S.A. at the superconducting magnet test hall SM18 with (from left to right) Coordinator for External Relations F. Pauss, Advisor for Non-Member States J. Ellis, J. Strait from Fermilab and Deputy Head of Technology Department L. Rossi on 13 November 2009.

    CERN Multimedia

    Maximilien Brice; SM18

    2009-01-01

    William Brinkman (centre), Director of the Department of Energy, U.S.A. at the superconducting magnet test hall SM18 with (from left to right) Coordinator for External Relations F. Pauss, Advisor for Non-Member States J. Ellis, J. Strait from Fermilab and Deputy Head of Technology Department L. Rossi on 13 November 2009.

  1. 8 April 2011 - Brazilian Minister of State for Science and Technology A. Mercadante Oliva signing the guest book with CERN Director-General R. Heuer and Head of International Relations F. Pauss; in the ATLAS visitor centre with Collaboration Former Spokesperson P. Jenni; visiting LHC superconducting magnet test hall with J.M. Jimenez.

    CERN Multimedia

    Maximilien Brice

    2011-01-01

    8 April 2011 - Brazilian Minister of State for Science and Technology A. Mercadante Oliva signing the guest book with CERN Director-General R. Heuer and Head of International Relations F. Pauss; in the ATLAS visitor centre with Collaboration Former Spokesperson P. Jenni; visiting LHC superconducting magnet test hall with J.M. Jimenez.

  2. 26th August 2010 - World Meteorological Organization Secretary-General M. Jarraud signing the guest book with CERN Director-General R. Heuer and visiting the LHC superconducting magnet test hall with Technology Department Head F. Bordry; throughout accompanied by M. Bona, CERN Relations with International Organisations

    CERN Multimedia

    Maximilien Brice

    2010-01-01

    26th August 2010 - World Meteorological Organization Secretary-General M. Jarraud signing the guest book with CERN Director-General R. Heuer and visiting the LHC superconducting magnet test hall with Technology Department Head F. Bordry; throughout accompanied by M. Bona, CERN Relations with International Organisations

  3. A Test Device Module of the Step Motor Driver for HANARO CAR Operation

    Energy Technology Data Exchange (ETDEWEB)

    Im, Yun-Taek; Doo, Seung-Gyu; Shin, Jin-Won; Kim, Ki-Hyun; Choi, Young-San; Lee, Jung-Hee; Kim, Hyung-Kyoo; Lee, Choong-Sung [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    The brand-new control system is reliable and has advantages compared with the old control system, and the installed system covers all functional operations of old system. Nevertheless, packaged RTP systems do not include a step motor or driver, and it is necessary to develop a proper test device to check the step motor and driver without using the RTP system. In particular, the operation of a CAR (Control Absorber Rod) requires many complicated procedures. Occasionally, it takes significant time to prepare for a field test. In this work, a test device module for a step motor diver is shown to emulate a HANARO CAR operation, and the test device system architecture, operational principle, and experiment results are presented. A commercial 8-bit μ-processor is applied to implement the device. A portable test device for HANARO CAR operation is presented. An 8-bit μ-controller is used to emulate a HANARO CAR operation. The digital interface, as well as the functional operation, of the test device module matches that of the currently used driver. This device can be used to check the functional validity of the step motor and driver.

  4. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  5. Integrated vehicle-based safety systems light-vehicle field operational test key findings report.

    Science.gov (United States)

    2011-01-01

    "This document presents key findings from the light-vehicle field operational test conducted as part of the Integrated Vehicle-Based Safety Systems program. These findings are the result of analyses performed by the University of Michigan Transportat...

  6. Integrated vehicle-based safety systems light-vehicle field operational test, methodology and results report.

    Science.gov (United States)

    2010-12-01

    "This document presents the methodology and results from the light-vehicle field operational test conducted as part of the Integrated Vehicle-Based Safety Systems program. These findings are the result of analyses performed by the University of Michi...

  7. Integrated vehicle-based safety systems (IVBSS) : light vehicle platform field operational test data analysis plan.

    Science.gov (United States)

    2009-12-22

    This document presents the University of Michigan Transportation Research Institutes plan to : perform analysis of data collected from the light vehicle platform field operational test of the : Integrated Vehicle-Based Safety Systems (IVBSS) progr...

  8. Integrated vehicle-based safety systems (IVBSS) : heavy truck platform field operational test data analysis plan.

    Science.gov (United States)

    2009-11-23

    This document presents the University of Michigan Transportation Research Institutes plan to perform : analysis of data collected from the heavy truck platform field operational test of the Integrated Vehicle- : Based Safety Systems (IVBSS) progra...

  9. Development, testing, and certification of Calmac Mfg. Corp. solar collector and solar operated pump

    Science.gov (United States)

    Parker, J. C.

    1979-01-01

    Development of a rubber tube solar collector and solar operated pump for use with solar heating and cooling systems is discussed. The development hardware, problems encountered during fabrication and testing, and certification statements of performance are included.

  10. Testing Methodology of Breaking into Secured Storages of Mobile Operational System Google Android

    Directory of Open Access Journals (Sweden)

    Elena Vyacheslavovna Elistratova

    2013-02-01

    Full Text Available The methodology is developed for carrying out the test of breaking into internal storages of mobile operational system Google Android in order to detect security threats for personal data.

  11. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    International Nuclear Information System (INIS)

    Naiknimbalkar, N.

    1993-01-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging

  12. Acceptance/Operational Test Report for Tank 241-AN-104 camera and camera purge control system

    International Nuclear Information System (INIS)

    Castleberry, J.L.

    1995-11-01

    This Acceptance/Operational Test Procedure (ATP/OTP) will document the satisfactory operation of the camera purge panel, purge control panel, color camera system and associated control components destined for installation. The final acceptance of the complete system will be performed in the field. The purge panel and purge control panel will be tested for its safety interlock which shuts down the camera and pan-and-tilt inside the tank vapor space during loss of purge pressure and that the correct purge volume exchanges are performed as required by NFPA 496. This procedure is separated into seven sections. This Acceptance/Operational Test Report documents the successful acceptance and operability testing of the 241-AN-104 camera system and camera purge control system

  13. Computer-aided dispatch--traffic management center field operational test : state of Utah final report

    Science.gov (United States)

    2006-07-01

    This document provides the final report for the evaluation of the USDOT-sponsored Computer-Aided Dispatch Traffic Management Center Integration Field Operations Test in the State of Utah. The document discusses evaluation findings in the followin...

  14. Portable traffic management system smart work zone application : operational test evaluation report

    Science.gov (United States)

    1997-05-01

    As part of its statewide Intelligent Transportation System (ITS), The Minnesota Department of Transportation (Mn/DOT) sponsored an operational test of the Portable Traffic Management System (PTMS) in a work zone application in cooperation with its pr...

  15. Computer-aided dispatch--traffic management center field operational test : Washington State final report

    Science.gov (United States)

    2006-05-01

    This document provides the final report for the evaluation of the USDOT-sponsored Computer-Aided Dispatch - Traffic Management Center Integration Field Operations Test in the State of Washington. The document discusses evaluation findings in the foll...

  16. Develop and Implement Operational Ground Testing Protocols to Individualize Astronaut Sleep Medication Efficacy and Individual Effects

    Data.gov (United States)

    National Aeronautics and Space Administration — The study protocol was successfully pilot tested with N=7 subjects (6 NASA flight surgeons and 1 Behavioral Health and Performance element Operations professional)...

  17. ATIS Market Research: A Survey of Operational Tests and University and Government Research

    Science.gov (United States)

    1994-03-01

    This report outlines research that examines the market for Advanced Traveler Information Systems (ATIS). The report includes detailed descriptions of Pathfinder, TravTek, and SmarTraveler ATIS operational tests. It includes basic background informati...

  18. Point of Maintenance Ruggedized Operational Device Evaluation and Observation Test Report

    National Research Council Canada - National Science Library

    Gorman, Megan

    2002-01-01

    .... The Ruggedized Operational Device Evaluation and Observation (RODEO) test examined hardware packaging, software user interface, and environmental factors associated with the usability of potential Point of Maintenance (POMx) electronic tools...

  19. Operability Test Report for 241-U Compressed Air System and heat pump

    International Nuclear Information System (INIS)

    Rensink, G.E.

    1995-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The system was upgraded. The operability test showed that the system operates within its intended design parameters. System performance was monitored, recorded, and used to identify areas of concern. Exceptions to the OTP and additional items for safe system performance were minimal and have been resolved; the air system is ready for Operation's use

  20. Testing an integrated model of operations capabilities An empirical study of Australian airlines

    NARCIS (Netherlands)

    Nand, Alka Ashwini; Singh, Prakash J.; Power, Damien

    2013-01-01

    Purpose - The purpose of this paper is to test the integrated model of operations strategy as proposed by Schmenner and Swink to explain whether firms trade-off or accumulate capabilities, taking into account their positions relative to their asset and operating frontiers.

  1. The operating experience and incident analysis for High Flux Engineering Test Reactor

    International Nuclear Information System (INIS)

    Zhao Guang

    1999-01-01

    The paper describes the incidents analysis for High Flux Engineering test reactor (HFETR) and introduces operating experience. Some suggestion have been made to reduce the incidents of HFETR. It is necessary to adopt new improvements which enhance the safety and reliability of operation. (author)

  2. Improved PFB operations - 400-hour turbine test results. [Pressurized Fluidized Bed

    Science.gov (United States)

    Rollbuhler, R. J.; Benford, S. M.; Zellars, G. R.

    1980-01-01

    The paper deals with a 400-hr small turbine test in the effluent of a pressurized fluidized bed (PFB) at an average temperature of 770 C, an average relative gas velocity of 300 m/sec, and average solid loadings of 200 ppm. Consideration is given to combustion parameters and operating procedure as well as to the turbine system and turbine test operating procedures. Emphasis is placed on erosion/corrosion results.

  3. Development of Open Test-bed for Autonomous Operation in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, Seungmin; Heo, Gyunyoung

    2017-01-01

    Nuclear power plants also recognize the need for automation. However, it is dangerous technology to have a significant impact on human society. In addition, due to the uncertain legal responsibility for autonomous operation, the application and development speed of nuclear energy related automation technology will be significantly decrease compared to other industries. It is argued that the application of AI and automation technology to power plants should not be prematurely applied or not based on the principle of applying proven technology since nuclear power plants are the highest level security operated facilities. As described above, the overall algorithm of the Test Bed is an autonomous operation algorithm (rulebased algorithm, learning-based algorithm, semiautonomous operation algorithm) to judge the entry condition of the procedure through condition monitoring and to enter the appropriate operating procedure. In order to make a test bed, the investigation for the heuristic part of the existing procedures and the heuristic part from the circumstance which is not specified in the procedure is needed. In the learning based and semi-autonomous operation algorithms, using MARS to extract its operating data and operational logs and try out various diagnostic algorithms as described above. Through the completion of these future tasks, the test bed which can compared with actual operators will be constructed and that it will be able to check its effectiveness by improving competitively with other research teams through the characteristics of shared platform.

  4. Effects of operator time pressure and noise on manual ultrasonic testing

    International Nuclear Information System (INIS)

    Enkvist, J.; Edland, A.; Svenson, O.

    2002-01-01

    In earlier studies of manual ultrasonic testing, great variations have been found in operator performance, often attributed to operator fatigue. However, no conclusive findings have been reported. In the present study, twenty operators performed manual ultrasonic inspections of six test-pieces with manufactured flaws. The operators performed the inspections under stress (high arousal - time pressure and noise) and no-stress conditions; one condition the first day and the other the second and last day. According to the Yerkes-Dodson Law there is an optimal arousal level where performance is highest. It was hypothesised that the stress condition led to a level of arousal so high that it would affect the results negatively. However, contrary to the hypotheses it was found that the manipulation increased operator performance. Operators with the stress condition day 1 performed better than the other operators (under the no-stress condition). This was interpreted as the 'stress first' (group 1) operators had established efficient performance patterns the first day - affecting also the second day. Operators beginning with stress condition also tended to be more motivated. It was concluded that operator performance is affected by arousal. (author)

  5. Integrated automatic non-destructive testing in industrial production and in the operation of technical plant

    International Nuclear Information System (INIS)

    Hoeller, P.

    1989-01-01

    The article deals with non-destructive testing (NDT) in automated manufacture and in the automated operation of industrial plant. In both areas of application, the tests are coupled to the process (real time operation) and the results are used for the control of manufacture or of the course of the process. The control process can be coupled to the process in open loop or closed loop. The subject is explained by the following examples: 1) Automated testing of sheets in a steelworks. 2) Automatic NDT on machine parts in tempering and machining by the 3MA system (3MA: micro-magnetic, multi-parameter, micro-structure and stress analysis). 3) Automated ultrasonic testing in manufacture and in the operation of plants with the ALOK data collection and processing system (ALOK: amplitude, running time, location curves). 4) Automated wheel running surface test on Intercity experimental train, and 5) automated level measurement on BWR pressure vessels. (orig./MM) [de

  6. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  7. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  8. Fermilab Education Office - Director's Award

    Science.gov (United States)

    Search The Director's Award Exceptional Service To Fermilab's K-12 Education Programs The many successes of Fermilab's K-12 education programs depend on the talents of the over 200 employees, users, and $1,000, made possible by an anonymous donor to Fermilab Friends for Science Education, recognizes one

  9. The governance of director networks

    NARCIS (Netherlands)

    Renneboog, L.D.R.; Zhou, Y.; Wright, M.; Siegel, D.; Keasey, K.; Filatotchev, I.

    2013-01-01

    This chapter studies director networks, which have gained increasing attention from sociology, finance, and management. It considers the argument that these networks have an interesting role in corporate governance and then reviews their rules in major developed countries. The chapter goes on to

  10. Real time test bed development for power system operation, control and cyber security

    Science.gov (United States)

    Reddi, Ram Mohan

    The operation and control of the power system in an efficient way is important in order to keep the system secure, reliable and economical. With advancements in smart grid, several new algorithms have been developed for improved operation and control. These algorithms need to be extensively tested and validated in real time before applying to the real electric power grid. This work focuses on the development of a real time test bed for testing and validating power system control algorithms, hardware devices and cyber security vulnerability. The test bed developed utilizes several hardware components including relays, phasor measurement units, phasor data concentrator, programmable logic controllers and several software tools. Current work also integrates historian for power system monitoring and data archiving. Finally, two different power system test cases are simulated to demonstrate the applications of developed test bed. The developed test bed can also be used for power system education.

  11. Nuclear instrumentation system operating experience and nuclear instrument testing in the EBR-II

    International Nuclear Information System (INIS)

    Yingling, G.E.; Curran, R.N.

    1980-01-01

    In March of 1972 three wide range nuclear channels were purchased from Gulf Atomics Corporation and installed in EBR-II as a test. The three channels were operated as a test until April 1975 when they became a permanent part of the reactor shutdown system. Also described are the activities involved in evaluating and qualifying neutron detectors for LMFBR applications. Included are descriptions of the ANL Components Technology Division Test Program and the EBR-II Nuclear Instrument Test Facilities (NITF) used for the in-reactor testing and a summary of program test results from EBR-II

  12. Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion

    International Nuclear Information System (INIS)

    Myers, N.K.

    1997-01-01

    This Operating Test Report (OTR) documents the performance results of the Operating Test Procedure HNF-SD-W417-OTP-001 that provides steps to test the waste transfer system installed in the 221-T Canyon under project W-417. Recent modifications have been performed on the T Plant Rail Car Waste Transfer System. This Operating Test Procedure (OTP) will document the satisfactory operation of the 221-T Rail Car Waste Transfer System modified by project W-417. Project W-417 installed a pump in Tank 5-7 to replace the steam jets used for transferring liquid waste. This testing is required to verify that operational requirements of the modified transfer system have been met. Figure 2 and 3 shows the new and existing system to be tested. The scope of this testing includes the submersible air driven pump operation in Tank 5-7, liquid waste transfer operation from Tank 5-7 to rail car (HO-IOH-3663 or HO-IOH-3664), associated line flushing, and the operation of the flow meter. This testing is designed to demonstrate the satisfactory operation-of the transfer line at normal operating conditions and proper functioning of instruments. Favorable results will support continued use of this system for liquid waste transfer. The Functional Design Criteria for this system requires a transfer flow rate of 40 gallons per minute (GPM). To establish these conditions the pump will be supplied up to 90 psi air pressure from the existing air system routed in the canyon. An air regulator valve will regulate the air pressure. Tank capacity and operating ranges are the following: Tank No. Capacity (gal) Operating Range (gal) 5-7 10,046 0 8040 (80%) Rail car (HO-IOH-3663 HO-IOH-3664) 097219,157 Existing Tank level instrumentation, rail car level detection, and pressure indicators will be utilized for acceptance/rejection Criteria. The flow meter will be verified for accuracy against the Tank 5-7 level indicator. The level indicator is accurate to within 2.2 %. This will be for information only

  13. Design of Jet lower hybrid current drive generator and operation of high power test bed

    International Nuclear Information System (INIS)

    Dobbing, J.A.; Bosia, G.; Brandon, M.; Gammelin, M.; Gormezano, C.; Jacquinot, J.; Jessop, G.; Lennholm, M.; Pain, M.; Sibley, A.

    1989-01-01

    The JET Lower Hybrid Current Drive (LHCD) generator consists of 24 klystrons each rated for 650 KW operating at 3.7 GHz, giving a nominal generator power of 15.6 MW for 10 seconds or 12 MW for 20 seconds. This power will be transmitted through 24 waveguides to a phased array launcher on one of the main ports of the JET machine. In addition, two klystrons are currently being operated on a high power test bed to establish reliable operation of the generators components and test high power microwave components prior to their installation

  14. W-026 integrated engineering cold run operational test report for balance of plant (BOP)

    International Nuclear Information System (INIS)

    Kersten, J.K.

    1998-01-01

    This Cold Run test is designed to demonstrate the functionality of systems necessary to move waste drums throughout the plant using approved procedures, and the compatibility of these systems to function as an integrated process. This test excludes all internal functions of the gloveboxes. In the interest of efficiency and support of the facility schedule, the initial revision of the test (rev 0) was limited to the following: Receipt and storage of eight overpacked drums, four LLW and four TRU; Receipt, routing, and staging of eleven empty drums to the process area where they will be used later in this test; Receipt, processing, and shipping of two verification drums (Route 9); Receipt, processing, and shipping of two verification drums (Route 1). The above listed operations were tested using the rev 0 test document, through Section 5.4.25. The document was later revised to include movement of all staged drums to and from the LLW and TRU process and RWM gloveboxes. This testing was performed using Sections 5.5 though 5.11 of the rev 1 test document. The primary focus of this test is to prove the functionality of automatic operations for all mechanical and control processes listed. When necessary, the test demonstrates manual mode operations as well. Though the gloveboxes are listed, only waste and empty drum movement to, from, and between the gloveboxes was tested

  15. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  16. Testing and operation of nuclear air-cleaning systems in Qinshan NPP

    International Nuclear Information System (INIS)

    Yang Lin

    1993-01-01

    The components of nuclear air-cleaning system, system function, operational mode and the performance of cleaning components in Qinshan Nuclear Power Plant are described. The items, purpose, methods and results of in-place testing after the installation are also described in detail. The in-place testing verifies that nuclear air-cleaning systems in Qinshan Nuclear Power Plant are reliable and high effective. It also describes the points of the operational management. It is shown that the good operational management is the key which developed prescription function of nuclear air-cleaning systems. At present, Qinshan Nuclear Power Plant will be in full power, the normal operation of the system is satisfied with the demand of safe operation in Qinshan Nuclear Power Company

  17. Clinical Experience of Auditory Brainstem Response Testing on Pediatric Patients in the Operating Room

    Directory of Open Access Journals (Sweden)

    Guangwei Zhou

    2012-01-01

    Full Text Available Objectives. To review our experience of conducting auditory brainstem response (ABR test on children in the operating room and discuss the benefits versus limitations of this practice. Methods. Retrospective review study conducted in a pediatric tertiary care facility. A total of 267 patients identified with usable data, including ABR results, medical and surgical notes, and follow-up evaluation. Results. Hearing status successfully determined in all patients based on the ABR results form the operating room. The degrees and the types of hearing loss also documented in most of the cases. In addition, multiple factors that may affect the outcomes of ABR in the operating room identified. Conclusions. Hearing loss in children with complicated medical issues can be accurately evaluated via ABR testing in the operating room. Efforts should be made to eliminate adverse factors to ABR recording, and caution should be taken when interpreting ABR results from the operating room.

  18. Start of operation of the Transrapid test layout in Emsland - aims and tasks

    Energy Technology Data Exchange (ETDEWEB)

    Heinrich, K; Polifka, F

    1983-12-01

    The MVP (Versuchs- und Planungsgesellschaft fuer Magnetbahnsysteme) has been founded to operate the Transrapid maglev test layout in Emsland. MVP is responsible not only for the operation, testing, development and management of the facility, but also will carry out operation analyses and economic investigations with the system. Partners in the MVP are the DB, Lufthansa German Airlines and IABG (Industrieanlagen-Betriebsgesellschaft). The MVP's small staff means that its work is mainly in coordinating and evaluating. Workintensive tasks are to be subcontracted, the main subcontractors being the partners themselves. This ensures that the MVP benefits from the expertise of the three partners in a way which would be possible only to a limited extent by the seconding of experts. The MVP's aims and tasks in respect of operation, testing and evaluation are directed at obtaining pointers to the usefulness of the maglev system for high-speed passenger transport and evolving recommendations for further procedure.

  19. Comprehensive Test Ban Treaty (CTBT) monitoring station operating regime influence on radionuclide detection sensitivity

    International Nuclear Information System (INIS)

    Williams, D.L.

    1999-01-01

    International Monitoring System (IMS) stations are being deployed worldwide in support of the Comprehensive [Nuclear] Test Ban Treaty (CTBT). The highly sensitive radionuclide monitoring stations regularly sample airborne radionuclide particulates to determine whether fission products are present in the atmosphere that may be indicative of a nuclear weapons test. Standards have been set for these stations regarding their operation regime and the minimum detectable concentrations (MDCs) for specific radionuclides likely to be present after a nuclear weapons test. This study uses actual CTBT monitoring data to relate a subset of the specified operational standards with the listed MDC limits. It is determined that a relationship exists between the specified operational regime and the MDC values. Since the background radioactivity is largely a function of the radon and thoron progeny, longer decay operational regimes allow for a reduction in the background. For longer lived radionuclides, this corresponds to a reduction in MDC. (author)

  20. Modification and Performance Evaluation of a Low Cost Electro-Mechanically Operated Creep Testing Machine

    Directory of Open Access Journals (Sweden)

    John J. MOMOH

    2010-12-01

    Full Text Available Existing mechanically operated tensile and creep testing machine was modified to a low cost, electro-mechanically operated creep testing machine capable of determining the creep properties of aluminum, lead and thermoplastic materials as a function of applied stress, time and temperature. The modification of the testing machine was necessitated by having an electro-mechanically operated creep testing machine as a demonstration model ideal for use and laboratory demonstrations, which will provide an economical means of performing standard creep experiments. The experimental result is a more comprehensive understanding of the laboratory experience, as the technology behind the creep testing machine, the test methodology and the response of materials loaded during experiment are explored. The machine provides a low cost solution for Mechanics of Materials laboratories interested in creep testing experiment and demonstration but not capable of funding the acquisition of commercially available creep testing machines. Creep curves of strain versus time on a thermoplastic material were plotted at a stress level of 1.95MPa, 3.25MPa and 4.55MPa and temperature of 20oC, 40oC and 60oC respectively. The machine is satisfactory since it is always ready for operation at any given time.

  1. Operational Testing and Measurement of the Resolving Time of a Counting Assembly

    International Nuclear Information System (INIS)

    Manent, G.; Scheemaecker, J. de

    1968-01-01

    An experiment is described which constitutes a very sensitive test of the satisfactory operation of a counting assembly. It makes it possible to measure the resolving time of an assembly to an accuracy of 1 per cent. A certain number of examples are presented which show the sensitivity of the test. (author) [fr

  2. Centrifuge. Operational Control Tests for Wastewater Treatment Facilities. Instructor's Manual [and] Student Workbook.

    Science.gov (United States)

    Arasmith, E. E.

    Designed for individuals who have completed National Pollutant Discharge Elimination System (NPDES) level 1 laboratory training skills, this module provides waste water treatment plant operators with the basic information needed to: (1) successfully run a centrifuge test; (2) accurately read results obtained in test tubes; and (3) obtain…

  3. System acceptance and operability test report for the RMCS exhauster C on flammable gas tanks

    International Nuclear Information System (INIS)

    Waldo, E.J.

    1998-01-01

    This test report documents the completion of acceptance and operability testing of the rotary mode core sampling (RMCS) exhauster C, as modified for use as a major stack (as defined by the Washington State Department of Health) on flammable gas tanks

  4. Energy and Environment Directorate Status Report March 2006

    International Nuclear Information System (INIS)

    Long, J S

    2006-01-01

    The Energy and Environment Directorate (E and ED) is one of 13 directorates at Lawrence Livermore National Laboratory (LLNL), which is operated by the University of California (UC) for the U.S. Department of Energy's National Nuclear Security Administration (NNSA). We operate in the context of a national security laboratory and focus on meeting major national needs, especially from a long-term perspective. In the LLNL context, E and ED is a hybrid ''program'' and ''discipline'' directorate, combining the program development responsibilities in the national energy and environment arenas to the benefit of the entire Laboratory and also serving as the Laboratory's science base of atmospheric, earth, environmental, and energy science. This Status Report is part of the annual evaluation process required by the Department of Energy (DOE) as part of its contract with UC. The annual review typically will focus on about one third of the activities and programs of a directorate, so that the entire organization is evaluated over a three-year window. This year's review is focused on the basic science foundations for the directorate and two major program areas in the directorate, with an update from a third program. The programs for review are: (1) Earth System Science and Engineering; (2) Nuclear Systems Science and Engineering; and (3) NARAC/IMAAC update. Major questions to be addressed during this review include: (1) Are the programmatic directions appropriate? How can they be improved? (2) What actions can E and ED take to ensure success? How well poised for success are the current staff and facilities? What additions are needed? (3) What recommendations can be made to the Director and the University? This Status Report provides background information on the entire directorate including the parts of the directorate that are the focus of this year's review by the Energy and Environment Directorate Review Committee, to be held March 6-9, 2006. The following sections describe

  5. Development of operation and maintenance technology for HTGRs by using HTTR (High Temperature engineering Test Reactor)

    Energy Technology Data Exchange (ETDEWEB)

    Shimizu, Atsushi, E-mail: shimizu.atsushi35@jaea.go.jp [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Kawamoto, Taiki [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Tochio, Daisuke [HTTR Reactor Engineering Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Saito, Kenji; Sawahata, Hiroaki; Honma, Fumitaka; Furusawa, Takayuki; Saikusa, Akio [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Takada, Shoji [HTTR Reactor Engineering Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Shinozaki, Masayuki [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan)

    2014-05-01

    To establish the technical basis of HTGR (High Temperature Gas cooled Reactor), the long term high temperature operation using HTTR was carried out in the high temperature test operation mode during 50-day since January till March, 2010. It is necessary to establish the technical basis of operation and maintenance by demonstrating the stability of plant during long-term operation and the reliability of components and facilities special to HTGRs, in order to attain the stable supply of the high temperature heat to the planned heat utilization system of HTTR. Test data obtained in the operation were evaluated for the technical issues which were extracted before the operation. As the results, it was confirmed that the temperatures and flow rate of primary and secondary coolant were well controlled within sufficiently small deviation against the disturbance by the atmospheric temperature variation in daily. Stability and reliability of the components and facility special to HTGRs was demonstrated through the long term high temperature operation by evaluating the heat transfer performance of high temperature components, the stability performance of pressure control to compensate helium gas leak, the reliability of the dynamic components such as helium gas circulators, the performance of heat-up protection of radiation shielding. Through the long term high temperature operation of HTTR, the technical basis for the operation and maintenance technology of HTGRs was established.

  6. Development of operation and maintenance technology for HTGRs by using HTTR (High Temperature engineering Test Reactor)

    International Nuclear Information System (INIS)

    Shimizu, Atsushi; Kawamoto, Taiki; Tochio, Daisuke; Saito, Kenji; Sawahata, Hiroaki; Honma, Fumitaka; Furusawa, Takayuki; Saikusa, Akio; Takada, Shoji; Shinozaki, Masayuki

    2014-01-01

    To establish the technical basis of HTGR (High Temperature Gas cooled Reactor), the long term high temperature operation using HTTR was carried out in the high temperature test operation mode during 50-day since January till March, 2010. It is necessary to establish the technical basis of operation and maintenance by demonstrating the stability of plant during long-term operation and the reliability of components and facilities special to HTGRs, in order to attain the stable supply of the high temperature heat to the planned heat utilization system of HTTR. Test data obtained in the operation were evaluated for the technical issues which were extracted before the operation. As the results, it was confirmed that the temperatures and flow rate of primary and secondary coolant were well controlled within sufficiently small deviation against the disturbance by the atmospheric temperature variation in daily. Stability and reliability of the components and facility special to HTGRs was demonstrated through the long term high temperature operation by evaluating the heat transfer performance of high temperature components, the stability performance of pressure control to compensate helium gas leak, the reliability of the dynamic components such as helium gas circulators, the performance of heat-up protection of radiation shielding. Through the long term high temperature operation of HTTR, the technical basis for the operation and maintenance technology of HTGRs was established

  7. Integrated System Health Management: Pilot Operational Implementation in a Rocket Engine Test Stand

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John L.; Morris, Jonathan A.; Turowski, Mark P.; Franzl, Richard

    2010-01-01

    This paper describes a credible implementation of integrated system health management (ISHM) capability, as a pilot operational system. Important core elements that make possible fielding and evolution of ISHM capability have been validated in a rocket engine test stand, encompassing all phases of operation: stand-by, pre-test, test, and post-test. The core elements include an architecture (hardware/software) for ISHM, gateways for streaming real-time data from the data acquisition system into the ISHM system, automated configuration management employing transducer electronic data sheets (TEDS?s) adhering to the IEEE 1451.4 Standard for Smart Sensors and Actuators, broadcasting and capture of sensor measurements and health information adhering to the IEEE 1451.1 Standard for Smart Sensors and Actuators, user interfaces for management of redlines/bluelines, and establishment of a health assessment database system (HADS) and browser for extensive post-test analysis. The ISHM system was installed in the Test Control Room, where test operators were exposed to the capability. All functionalities of the pilot implementation were validated during testing and in post-test data streaming through the ISHM system. The implementation enabled significant improvements in awareness about the status of the test stand, and events and their causes/consequences. The architecture and software elements embody a systems engineering, knowledge-based approach; in conjunction with object-oriented environments. These qualities are permitting systematic augmentation of the capability and scaling to encompass other subsystems.

  8. Test person operated 2-Alternative Forced Choice Audiometry compared to traditional audiometry

    DEFF Research Database (Denmark)

    Schmidt, Jesper Hvass; Brandt, Christian; Christensen-Dalsgaard, Jakob

      Background: With a newly developed technique, hearing thresholds can be estimated with a system operated by the test persons themselves. This technique is based on the 2 Alternative Forced Choice paradigm known from the psychoacoustic research theory. Test persons can operate the system very......-likelihood and up-down methods has proven effective and reliable even under suboptimal test settings. In non-optimal testing conditions i.e. as a part of a hearing conservation programme the headphone Sennheiser HDA-200 has been used as it contains hearing protection. This test-method has been validated......-retest studies of 2AFC audiometry are comparable to test-retest results known from traditional audiometry under standard clinical settings.   Conclusions 2 Alternative Forced Choice audiometry can be a reliable alternative to traditional audiometry especially under certain circumstances, where it can...

  9. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Science.gov (United States)

    DeGraff, B.; Howell, M.; Kim, S.; Neustadt, T.

    2017-12-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  10. EPRI flow-loop/in situ test program for motor-operated valves

    International Nuclear Information System (INIS)

    Hosler, J.F.; Dorfman, L.S.

    1994-01-01

    The Electric Power Research Institute is undertaking a comprehensive research program to develop and validate methods for predicting the performance of common motor-operated gate, global, and butterfly valves. To assess motor-operated valve (MOV) performance characteristics and provide a basis for methods validation, full-scale testing was conducted on 62 MOVs. Tests were performed in four flow-loop facilities and in nine nuclear units. Forty-seven gate, five globe, and 10 butterfly valves were tested under a wide range of flow and differential pressure conditions. The paper describes the test program scope, test configurations, instrumentation and data acquisition, testing approach, and data analysis methods. Key results are summarized

  11. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Energy Technology Data Exchange (ETDEWEB)

    Degraff, Brian D. [ORNL; Howell, Matthew P. [ORNL; Kim, Sang-Ho [ORNL; Neustadt, Thomas S. [ORNL

    2017-07-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  12. Recent operating experience during startup testing at latest 1100 MWe BWR-5 nuclear power plants

    International Nuclear Information System (INIS)

    Tanabe, Akira; Tateishi, Mizuo; Kajikawa, Makoto; Hayase, Yuichi.

    1986-01-01

    In June and September 1985, the latest two 1100 Mwe BWR-5 nuclear power plants started commercial operation about ten days earlier than initially expected without any unscheduled shutdown. These latest plants, 2F-3 and K-1, are characterized by an improved core with new 8 x 8 fuel assemblies, highly reliable control systems, advanced control room system and turbine steam full bypass system for full load rejection (2F3). This paper describes the following operating experiences gained during their startup testing. 1) Continuous operation at full load rejection. 2) Stable operation at natural circulating flow condition. 3) 31 and 23 hour short time start up operation. 4) 100-75-100 %, 1-8-1-14 hours daily load following operation. (author)

  13. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  14. Automatic Management Systems for the Operation of the Cryogenic Test Facilities for LHC Series Superconducting Magnets

    CERN Document Server

    Tovar-Gonzalez, A; Herblin, L; Lamboy, J P; Vullierme, B

    2006-01-01

    Prior to their final preparation before installation in the tunnel, the ~1800 series superconducting magnets of the LHC machine shall be entirely tested at reception on modular test facilities. The operation 24 hours per day of the cryogenic test facilities is conducted in turn by 3-operator teams, assisted in real time by the use of the Test Bench Priorities Handling System, a process control application enforcing the optimum use of cryogenic utilities and of the "Tasks Tracking System", a web-based e-traveller application handling 12 parallel 38-task test sequences. This paper describes how such computer-based management systems can be used to optimize operation of concurrent test benches within technical boundary conditions given by the cryogenic capacity, and how they can be used to study the efficiency of the automatic steering of all individual cryogenic sub-systems. Finally, this paper presents the overall performance of the cryomagnet test station for the first complete year of operation at high produ...

  15. Efficient compliance with prescribed bounds on operational parameters by means of hypothesis testing using reactor data

    International Nuclear Information System (INIS)

    Sermer, P.; Olive, C.; Hoppe, F.M.

    2000-01-01

    - A common problem in any reactor operations is to comply with a requirement that certain operational parameters are constrained to lie within some prescribed bounds. The fundamental issue which is to be addressed in any compliance description can be stated as follows: The compliance definition, compliance procedures and allowances for uncertainties in data and accompanying methodologies, should be well defined and justifiable. To this end, a mathematical framework for compliance, in which the computed or measured estimates of process parameters are considered random variables, is described in this paper. This allows a statistical formulation of the definition of compliance with licence or otherwise imposed limits. An important aspect of the proposed methodology is that the derived statistical tests are obtained by a Monte Carlo procedure using actual reactor operational data. The implementation of the methodology requires a routine surveillance of the reactor core in order to perform the underlying statistical tests. The additional work required for surveillance is balanced by the fact that the resulting actions on the reactor operations, implemented in station procedures, make the reactor 'safer' by increasing the operating margins. Furthermore, increased margins are also achieved by efficient solution techniques which may allow an increase in reactor power. A rigorous analysis of a compliance problem using statistical hypothesis testing based on extreme value probability distributions and actual reactor operational data leads to effective solutions in the areas of licensing, nuclear safety, reliability and competitiveness of operating nuclear reactors. (author)

  16. Cryogenic magnet tests for the LHC process operation using web-based tools and facilities

    CERN Document Server

    Hemelsoet, G H; Chohan, V; Veyrunes, E

    2005-01-01

    For the Large Hadron Collider under construction at CERN, an essential requirement is the acceptance test of its 1706 Cryo-magnets in cryogenic conditions in a purpose-built facility at CERN. Several teams ensure the proper operation of the infrastructure on a round the clock basis. The cold test part is one of the key elements amongst many other essential activities requiring magnet transport and connections/disconnections, cryogenic preparation and pumping, cooling down to 1.9 K as well warm up before disconnection & removal. All these operations involve multi-tasking and usage of 12 test benches with nominal turn-round time per dipole magnet of 120 hours. It also involves multiple teams of industrial contractors, a support contract for cryogenics operation, CERN staff in magnet testing Operation, aided by a large external collaboration of visiting staff for round the clock operation. This paper gives a flavour of the operation and exposes the software tools that were necessary, designed and developed t...

  17. Urinary cotinine testing as pre-operative assessment of patients undergoing free flap surgery.

    Science.gov (United States)

    Reinbold, C; Rausky, J; Binder, J-P; Revol, M

    2015-02-01

    The identified risks of smoking with regard to operated tissues are so elevated that it is clearly dangerous to operate a smoker when the proposed intervention is neither vital nor urgent. The aim of this prospective study was to evaluate a simple method of screening patients who smoke, with the evaluation carried out before agreeing to carry out free tissue transfer. The purpose of the testing was to hold the patient responsible for his actions and minimize smoking-related complications by cancelling or postponing the planned operation if the patient continued to smoke. Screening included use of a standardized questionnaire at the first consultation and detection of cotinine using a urine test strip 7 days before the scheduled surgery. Patients were informed that in the event of positive results, the operation would not take place. A six-week preoperative smoking cessation period was mandatory. Seventy-six patients were included in this study. Among them, 25 (32.9%) reported being former smokers and 11 (14.5%) admitted in the initial questionnaire to being active smokers. Six patients (7.9%), including one self-reported non-smoker, tested positive for cotinine, and their operations were cancelled. Screening using a questionnaire and cotinine detection appeared to constitute a simple, inexpensive, rapid and reliable test. It allowed us to refuse to operate 6 non-compliant patients and was thereby likely to diminish morbidity in the free tissue transfers carried out in our ward. Copyright © 2014 Elsevier Masson SAS. All rights reserved.

  18. Advanced Prototype Fan Operating Experience, Post Test Evaluation, and Refurbishment for PLSS 2.0 Test Use

    Science.gov (United States)

    Hodgson, Edward; Oehler, William; Dionne, Steve; Converse, David; Jennings, Mallory A.

    2012-01-01

    NASA s plans for Extravehicular Activity (EVA) portable life support systems for future exploration missions result in different design requirements than those which led to the combined fan / pump / separator in the current ISS Extravehicular Mobility Unit (EMU). To meet these new requirements, NASA contracted with Hamilton Sundstrand to provide two new prototype fans designed to meet anticipated future system requirements. Based on design trade studies, a high speed fan with mechanical bearing support of the rotating elements and a novel non-metallic barrier canned motor design was developed and implemented in the deliverable prototypes. The prototypes, which used two different bearing lubricants, have been extensively tested in both stand-alone and integrated system tests in NASA laboratories and proven to meet the anticipated performance requirements. Subsequently, they have been subjected to post test inspection and analysis in Hamilton Sundstrand laboratories to assess the effects of integrated operation and resultant exposure to vent loop contaminants. Results have confirmed expectations that one of the lubricants would be superior in this application and the prototype fans have been reassembled with new bearings with the superior lubricant. They have now been returned to the Johnson Space Center for further testing and maturation as part of NASA s PLSS 2.0 integrated test effort. This paper will discuss the test history of these units, resulting test data, the results of post test evaluation, and plans for further testing in the near future.

  19. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  20. Testing remotely operated module technique for Wackersdorf reprocessing plant at Lahde test rig

    International Nuclear Information System (INIS)

    Leister, P.; Schroeder, G.; Boehme, G.

    1986-01-01

    The FEMO technique represents a plant concept which makes it possible to carry out the repair of high and medium activity wet chemical stages of the process by remote handling without direct access by staff. For this purpose, the apparatus of this step of the process is arranged modularly in large cells, so that movable large handling devices such as cranes and manipulator systems can replace process components subject to wear via the process modules. The machine room of the former coal-fired power station Heyden I at Lahde was, after removal of the turbines and generators, converted to a hall in which the following test areas were accommodated: FEMO cell section with 10 positions for module, cell wall mock-up and wall penetration, module mounting area, module measuring position, workplace for service area, training position, welding position and FEMO control position. (orig./HP) [de

  1. A Methodology for Evaluation of Inservice Test Intervals for Pumps and Motor Operated Valves

    International Nuclear Information System (INIS)

    McElhaney, K.L.

    1999-01-01

    The nuclear industry has begun efforts to reevaluate inservice tests (ISTs) for key components such as pumps and valves. At issue are two important questions--What kinds of tests provide the most meaningful information about component health, and what periodic test intervals are appropriate? In the past, requirements for component testing were prescribed by the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The tests and test intervals specified in the Code were generic in nature and test intervals were relatively short. Operating experience has shown, however, that performance and safety improvements and cost savings could be realized by tailoring IST programs to similar components with comparable safety importance and service conditions. In many cases, test intervals may be lengthened, resulting in cost savings for utilities and their customers

  2. Results from the Operational Testing of the Eaton Smart Grid Capable Electric Vehicle Supply Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Brion [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    The Idaho National Laboratory conducted testing and analysis of the Eaton smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from Eaton for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the Eaton smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionality testing, abnormal conditions testing, and charging of a plug-in vehicle.

  3. Results from Operational Testing of the Siemens Smart Grid-Capable Electric Vehicle Supply Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Brion [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    The Idaho National Laboratory conducted testing and analysis of the Siemens smart grid capable electric vehicle supply equipment (EVSE), which was a deliverable from Siemens for the U.S. Department of Energy FOA-554. The Idaho National Laboratory has extensive knowledge and experience in testing advanced conductive and wireless charging systems though INL’s support of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. This document details the findings from the EVSE operational testing conducted at the Idaho National Laboratory on the Siemens smart grid capable EVSE. The testing conducted on the EVSE included energy efficiency testing, SAE J1772 functionality testing, abnormal conditions testing, and charging of a plug-in vehicle.

  4. Low-flow operation and testing of pumps in nuclear plants

    International Nuclear Information System (INIS)

    Greenstreet, W.L.

    1989-01-01

    Low-flow operation of centrifugal pumps introduces hydraulic instability and other factors that can cause damage to these machines. The resulting degradation has been studied and recorded for pumps in electric power plants. The objectives of this paper are to (1) describe the damage-producing phenomena, including their sources and consequences; (2) relate these observations to expectations for damage caused by low-flow operation of pumps in nuclear power plants; and (3) assess the utility of low-flow testing. Hydraulic behavior during low-flow operation is reviewed for a typical centrifugal pump stage, and the damage-producing mechanisms are described. Pump monitoring practices, in conjunction with pump performance characteristics, are considered; experience data are reviewed; and the effectiveness of low-flow surveillance monitoring is examined. Degradation caused by low-flow operation is shown to be an important factor, and low-flow surveillance testing is shown to be inadequate. 18 refs., 5 figs., 4 tabs

  5. Test operation of the uranium ore processing pilot plant and uranium conversion plant

    International Nuclear Information System (INIS)

    Suh, I.S.; Lee, K.I.; Whang, S.T.; Kang, Y.H.; Lee, C.W.; Chu, J.O.; Lee, I.H.; Park, S.C.

    1983-01-01

    For the guarantee of acid leaching process of the Uranium Ore Processing Pilot Plnat, the KAERI team performed the test operation in coorperation with the COGEMA engineers. The result of the operation was successful achieving the uranium leaching efficiency of 95%. Completing the guarentee test, a continuous test operation was shifted to reconform the reproducibility of the result and check the functions of every units of the pilot plant feeding the low-grade domestic ore, the consistency of the facility was conformed that the uranium can easily be dissolved out form the ore between the temperature range of 60degC-70degC for two hours of leaching with sulfuric acid and could be obtained the leaching efficiency of 92% to 95%. The uranium recovery efficiencies for the processes of extraction and stripping were reached to 99% and 99.6% respectively. As an alternative process for the separation of solid from the ore pulp, four of the Counter Current Decanters were shifted replacing the Belt Filter and those were connected in a series, which were not been tested during the guarantee operation. It was found out that the washing efficiencies of the ore pulp in each tests for the decanters were proportionally increased according to the quantities of the washing water. As a result of the test, it was obtained that washing efficiencies were 95%, 85%, 83% for the water to ore ratio of 3:1, 2:1, 1.5:1 respectively. (Author)

  6. National Security Cutter: Enhanced Oversight Needed to Ensure Problems Discovered during Testing and Operations Are Addressed

    Science.gov (United States)

    2016-01-01

    May Lead to NSCs and Future DHS Assets Deploying without Having Demonstrated Full Capabilities 22 Performance Issues Discovered Outside of IOT &E...Examples of National Security Cutter Critical Operational Issues and Key Performance Parameters 10 Table 3: National Security Cutter Major...Cutter IOT &E Initial Operational Test and Evaluation KPP Key Performance Parameter LRI-II Long-Range Interceptor II NSC National Security Cutter

  7. HERBE- Analysis of test operation results; HERBE - Analiza rezultata probnog rada

    Energy Technology Data Exchange (ETDEWEB)

    Pesic, M et al [Boris Kidric Institute of Nuclear Sciences Vinca, Belgrade (Yugoslavia)

    1991-01-15

    This document is part of the safety analyses performed for the RB reactor operation with the coupled fast-thermal system HERBE and is part of the final safety report together with the 'Report on test operation of HERBE for the period Dec. 15 1989 - May 15 1990. This report covers the following main topics: determination of reactivity variations dependent on the variations moderator critical level; determination of reactivity for the flooded neutron converter; and the accident analysis of neutron converter flooding.

  8. On the comparability of acceptance tests for concrete by operation characteristics

    International Nuclear Information System (INIS)

    Rackwitz, R.

    1978-01-01

    The purely statistical aspect of acceptance tests can be estimated by means of operation characteristics, the position and steepness of which determine the probability for acceptance or rejection of offered loads. For negative decisions in concrete checking there will be, as a rule, an after-check in normal quality control. The operation characteristics with after-check valid for DIN 1045, DIN 1084, and DIN 1048 are set up. Complete comparability of different acceptance tests by means of the operation characteristic can only be achieved if the different sampling rates and the number of decisions are also included in the consideration. Proposals for improving the acceptance tests for concrete are presented. (orig.) [de

  9. A study of operational and testing reliability in software reliability analysis

    International Nuclear Information System (INIS)

    Yang, B.; Xie, M.

    2000-01-01

    Software reliability is an important aspect of any complex equipment today. Software reliability is usually estimated based on reliability models such as nonhomogeneous Poisson process (NHPP) models. Software systems are improving in testing phase, while it normally does not change in operational phase. Depending on whether the reliability is to be predicted for testing phase or operation phase, different measure should be used. In this paper, two different reliability concepts, namely, the operational reliability and the testing reliability, are clarified and studied in detail. These concepts have been mixed up or even misused in some existing literature. Using different reliability concept will lead to different reliability values obtained and it will further lead to different reliability-based decisions made. The difference of the estimated reliabilities is studied and the effect on the optimal release time is investigated

  10. NASA UAS Traffic Management National Campaign Operations across Six UAS Test Sites

    Science.gov (United States)

    Rios, Joseph; Mulfinger, Daniel; Homola, Jeff; Venkatesan, Priya

    2016-01-01

    NASA's Unmanned Aircraft Systems Traffic Management research aims to develop policies, procedures, requirements, and other artifacts to inform the implementation of a future system that enables small drones to access the low altitude airspace. In this endeavor, NASA conducted a geographically diverse flight test in conjunction with the FAA's six unmanned aircraft systems Test Sites. A control center at NASA Ames Research Center autonomously managed the airspace for all participants in eight states as they flew operations (both real and simulated). The system allowed for common situational awareness across all stakeholders, kept traffic procedurally separated, offered messages to inform the participants of activity relevant to their operations. Over the 3- hour test, 102 flight operations connected to the central research platform with 17 different vehicle types and 8 distinct software client implementations while seamlessly interacting with simulated traffic.

  11. Operability test procedure for 241-U compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The supply piping to the 241-U Tank Farm is not included in the modification. Modifications to the 241-U-701 compressed air system include installation of a 15 HP Reciprocating Air Compressor, Ingersoll-Rand Model 10T3NLM-E15; an air dryer, Hankinson, Model DH-45; and miscellaneous system equipment and piping (valves, filters, etc.) to meet the design. A newly installed heat pump allows the compressor to operate within an enclosed relatively dust free atmosphere and keeps the compressor room within a standard acceptable temperature range, which makes possible efficient compressor operation, reduces maintenance, and maximizes compressor operating life. This document is an Operability Test Procedure (OTP) which will further verify (in addition to the Acceptance Test Procedure) that the 241-U-701 compressed air system and heat pump operate within their intended design parameters. The activities defined in this OTP will be performed to ensure the performance of the new compressed air system will be adequate, reliable and efficient. Completion of this OTP and sign off of the OTP Acceptance of Test Results is necessary for turnover of the compressed air system from Engineering to Operations

  12. The heating operational summarization in three winters of a 5 MW test heating reactor

    International Nuclear Information System (INIS)

    Wang Dazhong; Dong Duo; Su Qingshan; Zhang Yajun

    1992-09-01

    The 5 MW THR (5 MW test heating reactor) is a new type reactor with inherent safety developed by INET (Institute of Nuclear Energy Technology). It is the first 'pressure vessel type' heating reactor in operation in the world. It was put into operation in November, 1989. Since then it has operated for three winter seasons. The total operation time has reached to 8174 hours and its availability of heating has reached to 99%. The advanced technology of this reactor has been proved in the past three years operation. The characteristics of power regulating, load following, reactivity disturbance and the variation of parameters under the condition of ATWS (anticipated transients without scram) were studied with experiments in 5 MW THR. The 5 MW THR is an ideal heating reactor and has outstanding performances

  13. Second Line of Defense Megaports Initiative Operational Testing and Evaluation Plan Colon Container Terminal (CCT) Panama

    Energy Technology Data Exchange (ETDEWEB)

    Newhouse, Robert N.

    2010-01-01

    Report on the Operational Testing and Evaluation to validate and baseline an operable system that meets the Second Line of Defense (SLD) mission requirements. An SLD system is defined as the detection technology and associated equipment, the system operators from the host country, the standard operating procedures (SOPs), and other elements such as training and maintenance which support long-term system sustainment. To this end, the activities conducted during the OT&E phase must demonstrate that the Megaports System can be operated effectively in real-time by Panama Direccion General de Aduanas (DGA Panama Customs) personnel to the standards of the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA).

  14. Modelling and operation strategies of DLR's large scale thermocline test facility (TESIS)

    Science.gov (United States)

    Odenthal, Christian; Breidenbach, Nils; Bauer, Thomas

    2017-06-01

    In this work an overview of the TESIS:store thermocline test facility and its current construction status will be given. Based on this, the TESIS:store facility using sensible solid filler material is modelled with a fully transient model, implemented in MATLAB®. Results in terms of the impact of filler site and operation strategies will be presented. While low porosity and small particle diameters for the filler material are beneficial, operation strategy is one key element with potential for optimization. It is shown that plant operators have to ponder between utilization and exergetic efficiency. Different durations of the charging and discharging period enable further potential for optimizations.

  15. GSFC Systems Test and Operation Language (STOL) functional requirements and language description

    Science.gov (United States)

    Desjardins, R.; Hall, G.; Mcguire, J.; Merwarth, P.; Mocarsky, W.; Truszkowski, W.; Villasenor, A.; Brosi, F.; Burch, P.; Carey, D.

    1978-01-01

    The Systems Tests and Operation Language (STOL) provides the means for user communication with payloads, applications programs, and other ground system elements. It is a systems operation language that enables an operator or user to communicate a command to a computer system. The system interprets each high level language directive from the user and performs the indicated action, such as executing a program, printing out a snapshot, or sending a payload command. This document presents the following: (1) required language features and implementation considerations; (2) basic capabilities; (3) telemetry, command, and input/output directives; (4) procedure definition and control; (5) listing, extension, and STOL nucleus capabilities.

  16. Learning to Manage: A Program Just for Directors.

    Science.gov (United States)

    Thomas, Megan E.

    1996-01-01

    Describes the Head Start-Johnson & Johnson Management Fellows program, whose mission is strengthening management skills of Head Start directors by providing training in human resources management, organizational design and development, financial management, computers and information systems, operations, marketing, and development of strategic…

  17. Controlatron Neutron Tube Test Suite Software Manual - Operation Manual (V2.2)

    CERN Document Server

    Noel, W P; Hertrich, R J; Martinez, M L; Wallace, D L

    2002-01-01

    The Controlatron Software Suite is a custom built application to perform automated testing of Controlatron neutron tubes. The software package was designed to allowing users to design tests and to run a series of test suites on a tube. The data is output to ASCII files of a pre-defined format for data analysis and viewing with the Controlatron Data Viewer Application. This manual discusses the operation of the Controlatron Test Suite Software and a brief discussion of state machine theory, as state machine is the functional basis of the software.

  18. The CMS tracker operation and performance at the Magnet Test and Cosmic Challenge

    International Nuclear Information System (INIS)

    Adam, W; Bergauer, T; Dragicevic, M; Friedl, M; Fruehwirth, R; Haensel, S; Hrubec, J; Krammer, M; Pernicka, M; Waltenberger, W; Widl, E; Mechelen, P Van; Cardaci, M; Beaumont, W; Langhe, E de; Wolf, E A de; Delmeire, E; Bouhali, O; Charaf, O; Clerbaux, B

    2008-01-01

    During summer 2006 a fraction of the CMS silicon strip tracker was operated in a comprehensive slice test called the Magnet Test and Cosmic Challenge (MTCC). At the MTCC, cosmic rays detected in the muon chambers were used to trigger the readout of all CMS sub-detectors in the general data acquisition system and in the presence of the 4 T magnetic field produced by the CMS superconducting solenoid. This document describes the operation of the Tracker hardware and software prior, during and after data taking. The performance of the detector as resulting from the MTCC data analysis is also presented

  19. Results of the motor-operated valve engineering and testing program

    International Nuclear Information System (INIS)

    Black, B.R.

    1994-01-01

    The Texas Utilities Electric Company (TU Electric) motor-operated valve (MOV) program for implementing the recommendations of Generic Letter 89-10 has typically included the following: refurbishing each actuator, verifying each actuator's as-built configuration, testing each actuator's motor on a dynamometer, testing each actuator's torque spring pack (which is used to control the torque developed), testing each fully refurbished and reassembled actuator on a torque test stand, and testing as many MOVs as practicable both without fluid flow through the valve and with the maximum test conditions reasonably achievable (static and differential pressures (DP) conditions, respectively). Test data are acquired at 1,000 samples per second for stem thrust, stem torque, stem position, actuator compensator spring pack deflection, actuator torque spring pack deflection, motor current, motor voltage, motor three-phase power, valve upstream pressure, and valve downstream pressure, wherever practicable

  20. Desert Rats 2010 Operations Tests: Insights from the Geology Crew Members

    Science.gov (United States)

    Bleacher, J. E.; Hurtado, J. M., Jr.; Young, K. E.; Rice, J.; Garry, W. B.; Eppler, D.

    2011-01-01

    Desert Research and Technology Studies (Desert RATS) is a multi-year series of tests of NASA hardware and operations deployed in the high desert of Arizona. Conducted annually since 1997, these activities exercise planetary surface hardware and operations in relatively harsh conditions where long-distance, multi-day roving is achievable. Such activities not only test vehicle subsystems, they also stress communications and operations systems and enable testing of science operations approaches that advance human and robotic surface exploration capabilities. Desert RATS 2010 tested two crewed rovers designed as first-generation prototypes of small pressurized vehicles, consistent with exploration architecture designs. Each rover provided the internal volume necessary for crewmembers to live and work for periods up to 14 days, as well as allowing for extravehicular activities (EVAs) through the use of rear-mounted suit ports. The 2010 test was designed to simulate geologic science traverses over a 14-day period through a volcanic field that is analogous to volcanic terrains observed throughout the Solar System. The test was conducted between 31 August and 13 September 2010. Two crewmembers lived in and operated each rover for a week with a "shift change" on day 7, resulting in a total of eight test subjects for the two-week period. Each crew consisted of an engineer/commander and an experienced field geologist. Three of the engineer/commanders were experienced astronauts with at least one Space Shuttle flight. The field geologists were drawn from the scientific community, based on funded and published field expertise.

  1. Integration of Leadership Styles of School Director

    Science.gov (United States)

    Pavlovic, Nebojsa; Oljaca, Milka; Kostovic, Svetlana

    2012-01-01

    Management style can be defined as a special behavior of directors in the work process that affects the performance in an organization, in this case-school. Management style has two related meanings: first is behavior of directors to employees, second is directors' approach in school regarding management, participation of employees in decision…

  2. 30 CFR 282.11 - Director's authority.

    Science.gov (United States)

    2010-07-01

    ... CONTINENTAL SHELF FOR MINERALS OTHER THAN OIL, GAS, AND SULPHUR Jurisdiction and Responsibilities of Director § 282.11 Director's authority. (a) In the exercise of jurisdiction under § 282.10, the Director is... of two or more OCS mineral leases or portions of two or more OCS mineral leases into a single mining...

  3. 30 CFR 736.14 - Director's decision.

    Science.gov (United States)

    2010-07-01

    ... Director shall publish the decision in the Federal Register, including a statement of the basis and purpose... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Director's decision. 736.14 Section 736.14... Director's decision. (a) After considering all relevant information received under § 736.12 of this part...

  4. Operation, test, research and development of the high temperature engineering test reactor (HTTR). FY1999-2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-05-01

    The HTTR (High Temperature Engineering Test Reactor) with the thermal power of 30 MW and the reactor outlet coolant temperature of 850/950 degC is the first high temperature gas-cooled reactor (HTGR) in Japan, which uses coated fuel particle, graphite for core components, and helium gas for primary coolant. The HTTR, which locates at the south-west area of 50,000 m{sup 2} in the Oarai Research Establishment, had been constructed since 1991 before accomplishing the first criticality on November 10, 1998. Rise to power tests of the HTTR started in September, 1999 and the rated thermal power of 30 MW and the reactor outlet coolant temperature of 850 degC was attained in December 2001. JAERI received the certificate of pre-operation test, that is, the commissioning license for the HTTR in March 2002. This report summarizes operation, tests, maintenance, radiation control, and construction of components and facilities for the HTTR as well as R and Ds on HTGRs from FY1999 to 2001. (author)

  5. Testing of Vegetable-Based dutting Fluid by Hole Making Operation

    DEFF Research Database (Denmark)

    Belluco, Walter; De Chiffre, Leonardo

    2000-01-01

    in connection with the development of vegetable based cutting oils. Results show that drilling and tapping qualify as operations in which cutting forces can be resolved within one test when they differ by less than 1 percent by taking 6 repetitions, and measurements could be repeated with relative standard...... development and testing of vegetable based oils of equal or better performance than a reference commercial mineral oil....

  6. Office of the Secretary of Defense Research, Development Test and Evaluation, Development and Test Evaluation, Defense, Director of Operational Test and Evaluation Defense, FY 1994 Budget Estimates, Justification of Estimates Submitted to Congress April 1993

    Science.gov (United States)

    1993-04-01

    mama ActuAl -timt% r EzZnaat ooP-P irnarm EE-27 Advanced Space Technology Program 30,340 14,711 30,213 Continuing Continuing B. (U) BRIEF DESCRTPTION OF...min- imize delirious effects, such as cancer and mutations that may result from radi- ation exposures encountered on earth or in space, and 3) maintain...combinations which enhance survival and maintain performance. - Initiate cancer studies in VIVO/in VITRO on heavy charged particles. - Initiate program on

  7. Effects on fatigue life of gate valves due to higher torque switch settings during operability testing

    International Nuclear Information System (INIS)

    Richins, W.D.; Snow, S.D.; Miller, G.K.; Russell, M.J.; Ware, A.G.

    1995-12-01

    Some motor operated valves now have higher torque switch settings due to regulatory requirements to ensure valve operability with appropriate margins at design basis conditions. Verifying operability with these settings imposes higher stem loads during periodic inservice testing. These higher test loads increase stresses in the various valve internal parts which may in turn increase the fatigue usage factors. This increased fatigue is judged to be a concern primarily in the valve disks, seats, yokes, stems, and stem nuts. Although the motor operators may also have significantly increased loading, they are being evaluated by the manufacturers and are beyond the scope of this study. Two gate valves representative of both relatively weak and strong valves commonly used in commercial nuclear applications were selected for fatigue analyses. Detailed dimensional and test data were available for both valves from previous studies at the Idaho National Engineering Laboratory. Finite element models were developed to estimate maximum stresses in the internal parts of the valves and to identity the critical areas within the valves where fatigue may be a concern. Loads were estimated using industry standard equations for calculating torque switch settings prior and subsequent to the testing requirements of USNRC Generic Letter 89--10. Test data were used to determine both; (1) the overshoot load between torque switch trip and final seating of the disk during valve closing and (2) the stem thrust required to open the valves. The ranges of peak stresses thus determined were then used to estimate the increase in the fatigue usage factors due to the higher stem thrust loads. The usages that would be accumulated by 100 base cycles plus one or eight test cycles per year over 40 and 60 years of operation were calculated

  8. SMTMS - SM18 Magnet Tests Management System: a Brief User Guide for Operation

    CERN Document Server

    Chohan, N; CERN. Geneva. AB Department

    2004-01-01

    As the number of magnets to be tested under cryogenic conditions increased during the course of 2003, it was clear that a versatile computer-based tool was urgently required for keeping track of all the necessary tests that were carried out for each magnet as well as the outcome of the tests. It was also essential to keep track of the times taken during different phases in magnet preparation for the tests, including Cryogenic connections, cool-downs, warm ups and so forth. SMTMS uses the CERN provided backbone in Web based services and Access database to fulfil these urgent needs and was successfully made operational within a very short time. It has considerably eased & simplified the work in operation for cold testing the magnets with a few permanent core operational staff and a considerably large number of rotational personnel of short duration. This is because SMTMS is now the exclusive & unique Web-based tool to manage the tests and collate the essential electrical characterisation and quench resu...

  9. Intra-operative Assessment of the Spinal Cord Function: Awakening Compared to Ankle Clonus Test

    International Nuclear Information System (INIS)

    Amin, Wafik A.; Tealab, Ayman I.; Ei-Gendy, Eslah H.; Esmat, Hesham A.

    2006-01-01

    The spinal cord is at high risk of injury during special procedures such as correction of scoliosis. Recovery from impairement is directly proportional to the time of removal of the instrumentations. For this, methods used to detect the neurologic injury should be continuous, fast, sensitive and specific. The present study was performed to evaluate the ankle clonus as a test for the integrity of the spinal cord function intraoperatively. Twenty eight scoliotic patients were included in the study. The ankle clonus was tested before, during and after the correction and fixation followed by the wake-up test to correlate the results of both rests. The haemodynamics changes at the time of the two tests were compared. It was found out that, the ankle clonus test correlated well with the wake-up test, with only two false positive results. No false negative results were recorded which was an important finding. The haemodynamic changes were better during the ankle clonus test than during the wake-up test. It was concluded that the ankle clonus test is reliable, safe, and faster than the wake-up test. It is recommended to use the test to evaluate the integrity of the spinal cord during the operations with potential risk to the cord. In case the result of the ankle clonus is positive, the wake-up test should be done before an attempt to release or remove the instrumentations. (author)

  10. Limitations of the inspection and testing concepts for pressurised components from the viewpoint of operating experience

    International Nuclear Information System (INIS)

    Schulz, H.

    2001-01-01

    The role of in-service inspection and testing is to contribute to a safe and reliable operation of systems, structures and components. It is therefore the objective of inspections and tests to identify malfunctions and degradations at a stage early enough to avoid detrimental impacts on safety as well as on the reliability of the plant. Taking mostly the pressure boundary of German light-water reactors as an example, it is the intention of this paper to analyse how successful present inspection and testing requirements are and to discuss limitations. Based on a review of the world-wide operating experience the following questions of a more generic nature are addressed: - Are the relevant damage mechanisms being addressed in our codes and standards? - What are the criteria to develop a representative scope of inspection? - How to maintain a sufficient level of information for a decreasing number of nuclear power plants in operation? It can be concluded that the revision of codes and standards according to lessons learned from operating experience remains as an ongoing process. Furthermore, the criteria applied to derive a representative scope of inspection need to be addressed in more detail, specifically with respect to corrosion. The continuous evaluation of operating experience of a large number of plants is the most valuable source to identify beginning degradations. (author)

  11. Helium turbomachinery operating experience from gas turbine power plants and test facilities

    International Nuclear Information System (INIS)

    McDonald, Colin F.

    2012-01-01

    The closed-cycle gas turbine, pioneered and deployed in Europe, is not well known in the USA. Since nuclear power plant studies currently being conducted in several countries involve the coupling of a high temperature gas-cooled nuclear reactor with a helium closed-cycle gas turbine power conversion system, the experience gained from operated helium turbomachinery is the focus of this paper. A study done as early as 1945 foresaw the use of a helium closed-cycle gas turbine coupled with a high temperature gas-cooled nuclear reactor, and some two decades later this was investigated but not implemented because of lack of technology readiness. However, the first practical use of helium as a gas turbine working fluid was recognized for cryogenic processes, and the first two small fossil-fired helium gas turbines to operate were in the USA for air liquefaction and nitrogen production facilities. In the 1970's a larger helium gas turbine plant and helium test facilities were built and operated in Germany to establish technology bases for a projected future high efficiency large nuclear gas turbine power plant concept. This review paper covers the experience gained, and the lessons learned from the operation of helium gas turbine plants and related test facilities, and puts these into perspective since over three decades have passed since they were deployed. An understanding of the many unexpected events encountered, and how the problems, some of them serious, were resolved is important to avoid them being replicated in future helium turbomachines. The valuable lessons learned in the past, in many cases the hard way, particularly from the operation in Germany of the Oberhausen II 50 MWe helium gas turbine plant, and the technical know-how gained from the formidable HHV helium turbine test facility, are viewed as being germane in the context of current helium turbomachine design work being done for future high efficiency nuclear gas turbine plant concepts. - Highlights:

  12. Thermal calculations for the design, construction, operation, and evaluation of the Spent Fuel Test - Climax, Nevada Test Site

    International Nuclear Information System (INIS)

    Montan, D.N.; Patrick, W.C.

    1981-01-01

    The Spent Fuel Test-Climax (SFT-C) is a test of retrievable deep geologic storage of commercially generated spent nuclear reactor fuel in granitic rock. Eleven spent fuel assemblies, together with six electrical simulators and 20 guard heaters, are emplaced 420 m below the surface in the Climax granite at the US Department of Energy Nevada Test Site. On June 2, 1978 LLNL secured funding for the SFT-C, and completed spent fuel emplacement May 28, 1980. This report documents a series of thermal calculations that were performed in support of the SFT-C. Early calculations employed analytical solutions to address such design and construction issues as drift layout and emplacement hole spacings. Operational aspects of the test required more detailed numerical solutions dealing with ventilation and guard-heater power levels. The final set of calculations presented here provides temperature histories throughout the test facility for evaluation of the response of the SFT-C and for comparison of calculations with acquired data. This final set of calculations employs the as-built test geometry and best-available material properties

  13. Operational test report for the AY-102 Enraf densitometer control and acquisition system

    International Nuclear Information System (INIS)

    Huber, J.H.

    1998-01-01

    On June 2 through June 10, 1998, the AY-102 Tank Densitometer Control and Acquisition System was operationally tested per OTP-320-01 O Revision A-O. The test was performed at the Department of Energy's Hanford Site, 200 East Area, 241-AY Tank Farm. The test validated the functionality of the Enraf 854 ATG Densitometer Gauge and Enraf Control Panel software for use by project W-320, Waste Retrieval Sluicing System (WRSS). The purpose of the test procedure was two fold: (1) to verify the functionality of the Enraf 854 ATG as a Densitometer and (2) to verify the functionality of the Enraf Control Panel Software density acquisition routines. The densitometer was previously acceptance tested per HNF-SD-WM-ATP-077. The software was previously acceptance tested per HNF-1991

  14. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    Energy Technology Data Exchange (ETDEWEB)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  15. IAEA Director General to Visit Iran

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: The Director General of the IAEA, Yukiya Amano, will travel to Tehran this Sunday, 20 May 2012, to discuss issues of mutual interest with high Iranian officials. In the course of his one-day working visit, on Monday 21 May 2012 the Director General will meet the Secretary of Iran's Supreme National Security Council, His Excellency Saeed Jalili, and other senior representatives of the Iranian government. Herman Nackaerts, Deputy Director General for Safeguards, and Rafael Mariano Grossi, Assistant Director General for Policy, will accompany the Director General. (IAEA)

  16. Operational radioactive defense waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1981-07-01

    The Operational Radioactive Defense Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  17. Flight test of a head-worn display as an equivalent-HUD for terminal operations

    Science.gov (United States)

    Shelton, K. J.; Arthur, J. J.; Prinzel, L. J.; Nicholas, S. N.; Williams, S. P.; Bailey, R. E.

    2015-05-01

    Research, development, test, and evaluation of flight deck interface technologies is being conducted by NASA to proactively identify, develop, and mature tools, methods, and technologies for improving overall aircraft safety of new and legacy vehicles operating in the Next Generation Air Transportation System (NextGen). Under NASA's Aviation Safety Program, one specific area of research is the use of small Head-Worn Displays (HWDs) as a potential equivalent display to a Head-up Display (HUD). Title 14 of the US CFR 91.175 describes a possible operational credit which can be obtained with airplane equipage of a HUD or an "equivalent"' display combined with Enhanced Vision (EV). A successful HWD implementation may provide the same safety and operational benefits as current HUD-equipped aircraft but for significantly more aircraft in which HUD installation is neither practical nor possible. A flight test was conducted to evaluate if the HWD, coupled with a head-tracker, can provide an equivalent display to a HUD. Approach and taxi testing was performed on-board NASA's experimental King Air aircraft in various visual conditions. Preliminary quantitative results indicate the HWD tested provided equivalent HUD performance, however operational issues were uncovered. The HWD showed significant potential as all of the pilots liked the increased situation awareness attributable to the HWD's unique capability of unlimited field-of-regard.

  18. Total test operation of HSST-100 and planning project in Nagoya

    Energy Technology Data Exchange (ETDEWEB)

    Fujino, Masaaki [Chubu HSST Development Corp., Nagoya (Japan); Mizuma, Takeshi [Traffic Safety and Nuisance Research Inst., Ministry of Transport, Tokyo (Japan)

    1996-12-31

    HSST-100 is an urban mass transit system consisting of normal conductivity magnetic levitation. Its special feature is less noise and vibration. Test running operation has been carried out for the last 4 years in Nagoya. Due to the HSST feasibility Study Committee the HSST-100 system is now ready for commercial use. (HW)

  19. The high current test facility injector operation to 40 mA dc

    International Nuclear Information System (INIS)

    Ungrin, J.; Ormrod, J.H.; Michel, W.L.

    1976-01-01

    The high current test facility injector is a 750 keV proton accelerator designed to investigate the problems involved in the acceleration of intense dc proton beams. The performance of the injector and the experience gained in operation with dc beams up to 40 mA are described. (author)

  20. Tank 241-C-106 in-tank imaging system operational test report

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1998-01-01

    This document presents the results of operational testing of the 241-C-106 In-Tank Video Camera Imaging System. This imaging system was installed as a component of Project W-320 to monitor sluicing and waste retrieval activities in Tank 241-C-106

  1. NRC test results and operations experience provide insights for a new gate valve stem force correlation

    International Nuclear Information System (INIS)

    Watkins, John C.; Steele, Robert Jr.; DeWall, Kevin G.; Weidenhamer, G.H.; Rothberg, O.O.

    1994-01-01

    This paper presents the results of testing sponsored by the NRC to assess valve and motor operator performance under varying pressure and fluid conditions. This effort included an examination of the methods used by the industry to predict the required stem force of a valve, and research to provide guidelines for the extrapolation of in situ test results to design basis conditions.Years ago, when most of these valves were originally installed, the industry used a set of equations to determine analytically that the valves' motor-operators were large enough and the control switches were set high enough to close the valves at their design basis conditions. Our research has identified several inconsistencies with the industry's existing gate valve stem force equation and has challenged the overly simplistic assumptions inherent in its use. This paper discusses the development of the INEL correlation, which serves as the basis for a method to bound the stem force necessary to close flexwedge gate valves whose operational characteristics have been shown to be predictable. As utilities undertake to provide assurance of their valves' operability, this ability to predict analytically the required stem force is especially important for valves that cannot be tested at design basis conditions. For such valves, the results of tests conducted at less severe conditions can be used with the INEL correlation to make the necessary prediction. ((orig.))

  2. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    Science.gov (United States)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  3. 32 CFR Appendix E to Part 246 - Stars and Stripes (S&S) Board of Directors

    Science.gov (United States)

    2010-07-01

    ... of directors shall monitor planning and execution of the S&S business activities. 2. The S&S board of... DEFENSE (CONTINUED) MISCELLANEOUS STARS AND STRIPES (S&S) NEWSPAPER AND BUSINESS OPERATIONS Pt. 246, App. E Appendix E to Part 246—Stars and Stripes (S&S) Board of Directors A. Organization and Management...

  4. Papike appointed Director of IOM

    Science.gov (United States)

    James Papike was appointed director of the Institute of Meteoritics in the Department of Geology and Presidential Professor at the University of New Mexico, Albuquerque, on July 1, 1990. Papike succeeded Klaus Keil, who moved to the University of Hawaii to direct the Planetary Geoscience Division at the Hawaii Institute of Geosciences.The newly constituted IOM will emphasize planetary volcanic processes through the study of achondritic meteorites, the Moon, and Earth, and the origin of primitive solar system materials and planetary formation through the study of chondritic meteorites.

  5. A Study on Virtual Operating Crew and Test Commander For the Experience Accumulating Test of Unproven MMIS Technology

    International Nuclear Information System (INIS)

    Shin, Yeong Cheol; Kang, Sung Kon

    2007-01-01

    New MMIS (Man Machine Interface System) technology is rapidly advanced as digital technology provides opportunity for more functionality and better cost effectiveness. Also, NPP (Nuclear Power Plant) operators are inclined to use the new technology for the construction of new plant and for the upgrade of existing plants. However, this new technology may include risks at the same time. These risks are mainly due to the poor reliability of newly developed technology. According to the user requirement (KURD: Korean Utility Requirement Document), advanced MMIS technology may be applied if it could be apparently needed to obtain a defined gain in simplicity or performance. For applying new MMIS technology, reliability needs to be verified on the basis of the requirements of proven technology. KURD suggests two methods for verifying satisfaction of the requirement of proven technology. These methods are to verity whether or not unproven MMIS technology has adequate reliability. First method is that it has at least three years of documented, satisfactory service as modules of subsystems in power plant applications similar to that in LWRs or in other than power plant applications which are similar to the use in the APR1400 M-MIS. Second method is that it has satisfactorily completed a defined program of prototype testing which has been designed to verify its performance in the APR1400 M-MIS application. But, new MMIS technology had not yet opportunity to apply in the Nuclear Power Plant. Therefore, we think that second method is the effective method to demonstrate reliability and performance of new technology through the experience accumulation test. In here, Experience accumulation test means that we emulate the process of nuclear power plant such as installation after shipping, trial operation, operation, and maintenance with MMIS facility and verify reliability and performance through various test method under the circumstance of emulation and if any problem occurs

  6. Cognitive Dysfunction after On-Pump Operations: Neuropsychological Characteristics and Optimal Core Battery of Tests

    Directory of Open Access Journals (Sweden)

    Anna G. Polunina

    2014-01-01

    Full Text Available Postoperative cognitive dysfunction (POCD is a mild form of perioperative ischemic brain injury, which emerges as memory decline, decreased attention, and decreased concentration during several months, or even years, after surgery. Here we present results of our three neuropsychological studies, which overall included 145 patients after on-pump operations. We found that the auditory memory span test (digit span was more effective as a tool for registration of POCD, in comparison with the word-list learning and story-learning tests. Nonverbal memory or visuoconstruction tests were sensitive to POCD in patients after intraoperative opening of cardiac chambers with increased cerebral air embolism. Psychomotor speed tests (digit symbol, or TMT A registered POCD, which was characteristic for elderly atherosclerotic patients. Finally, we observed that there were significant effects of the order of position of a test on the performance on this test. For example, the postoperative performance on the core tests (digit span and digit symbol showed minimal impairment when either of these tests was administered at the beginning of testing. Overall, our data shows that the selection of tests, and the order of which these tests are administered, may considerably influence the results of studies of POCD.

  7. On The Improvement of the System of Board of Directors in China

    Directory of Open Access Journals (Sweden)

    Zhao Jinlong

    2014-09-01

    Full Text Available Currently, shareholder democracy in many countries are gaining much more attention because many factors have damaged shareholder’s rights and interest, in which is the problem of the system of board of directors when it operated, including the formalization of the board of directors, the autocracy of managers and staggered boards. To safeguard the legitimate interests of the company and minority shareholders, the system of board of directors is to be improved in following areas: defining the supervision functions and powers of the board of directors, setting up sub-committees within the board, improving the director appointing mechanism and electoral system, improving the director qualification system, abolishing the system of legal representative of company, and improving the system of duty of care and related liabilities.

  8. [Developing and testing of decompression regimes for caisson operations while constructing Moscow metro].

    Science.gov (United States)

    Rodchenkov, S V; Syrovegin, A V; Shulagin, I A

    1996-01-01

    Decompression regimes for caisson operations at the pressures up to 5 ata exceeding duration of the regimes specified in the caisson regulations have been developed. The regimes were tested and validated in dry altitude chamber with participation of exercising human subjects. Seventeen test-subjects took part in 54 tests. No symptoms of decompression sickness were documented. Air embolism was observed in 28 +/- 6% of cases at rest and in 72 +/- 6% of cases following provocative leg movements. The air embolism expression tended to increase with exposure to pressure.

  9. Analyses of the Anticipated Operational Occurrences for the HANARO Fuel Test Loop

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. K.; Sim, B. S.; Chi, D. Y.; Lee, C. Y.; Ahn, S. H

    2007-12-15

    The analyses of anticipated operational occurrences of the HANARO fuel test loop have been carried out by using the MARS/FTL{sub A} code, which is a modified version of the MARS code. A critical heat flux correlation on the three rods with triangular array was implemented in the MARS/FTL{sub A} code. The correlation was obtained from the critical heat fluxes measured at a test section, which is the same geometry of the in-pile test section of the HANARO fuel test loop. The anticipated operational occurrences of the HANARO fuel test loop are the inadvertent closure of the isolation valves, the over-power transient of the HANARO, the stuck open of the safety valves, and the loss of HANARO class IV power. A minimum DNBR (Departure from Nucleate Boiling Ratio) was predicted in the inadvertent closure of the isolation valves. It is indicated that the minimum DNBR of 1.85 is greater than the design limit DNBR of 1.39. The maximum coolant pressure calculated in the anticipated operational occurrences is also less than the 110 percents of the design pressure.

  10. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Science.gov (United States)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  11. Analyses of the Anticipated Operational Occurrences for the HANARO Fuel Test Loop

    International Nuclear Information System (INIS)

    Park, S. K.; Sim, B. S.; Chi, D. Y.; Lee, C. Y.; Ahn, S. H.

    2007-12-01

    The analyses of anticipated operational occurrences of the HANARO fuel test loop have been carried out by using the MARS/FTL A code, which is a modified version of the MARS code. A critical heat flux correlation on the three rods with triangular array was implemented in the MARS/FTL A code. The correlation was obtained from the critical heat fluxes measured at a test section, which is the same geometry of the in-pile test section of the HANARO fuel test loop. The anticipated operational occurrences of the HANARO fuel test loop are the inadvertent closure of the isolation valves, the over-power transient of the HANARO, the stuck open of the safety valves, and the loss of HANARO class IV power. A minimum DNBR (Departure from Nucleate Boiling Ratio) was predicted in the inadvertent closure of the isolation valves. It is indicated that the minimum DNBR of 1.85 is greater than the design limit DNBR of 1.39. The maximum coolant pressure calculated in the anticipated operational occurrences is also less than the 110 percents of the design pressure

  12. Impact of closed Brayton cycle test results on gas cooled reactor operation and safety

    International Nuclear Information System (INIS)

    Wright, St.A.; Pickard, P.S.

    2007-01-01

    This report summarizes the measurements and model predictions for a series of tests supported by the U.S. Department of Energy that were performed using the recently constructed Sandia Brayton Loop (SBL-30). From the test results we have developed steady-state power operating curves, controls methodologies, and transient data for normal and off-normal behavior, such as loss of load events, and for decay heat removal conditions after shutdown. These tests and models show that because the turbomachinery operates off of the temperature difference (between the heat source and the heat sink), that the turbomachinery can continue to operate (off of sensible heat) for long periods of time without auxiliary power. For our test hardware, operations up to one hour have been observed. This effect can provide significant operations and safety benefits for nuclear reactors that are coupled to a Brayton cycles because the operating turbomachinery continues to provide cooling to the reactor. These capabilities mean that the decay-heat removal can be accommodated by properly managing the electrical power produced by the generator/alternator. In some conditions, it may even be possible to produce sufficient power to continue operating auxiliary systems including the waste heat circulatory system. In addition, the Brayton plant impacts the consequences of off-normal and accident events including loss of load and loss of on-site power. We have observed that for a loss of load or a loss of on-site power event, with a reactor scram, the transient consists initially of a turbomachinery speed increase to a new stable operating point. Because the turbomachinery is still spinning, the reactor is still being cooled provided the ultimate heat sink remains available. These highly desirable operational characteristics were observed in the Sandia Brayton loop. This type of behavior is also predicted by our models. Ultimately, these results provide the designers the opportunity to design gas

  13. Operational-safety advantages of LMFBR's: the EBR-II experience and testing program

    International Nuclear Information System (INIS)

    Sackett, J.I.; Lindsay, R.W.; Golden, G.H.

    1982-01-01

    LMFBR's contain many inherent characteristics that simplify control and improve operating safety and reliability. The EBR-II design is such that good advantage was taken of these characteristics, resulting in a vary favorable operating history and allowing for a program of off-normal testing to further demonstrate the safe response of LMFBR's to upsets. The experience already gained, and that expected from the future testing program, will contribute to further development of design and safety criteria for LMFBR's. Inherently safe characteristics are emphasized and include natural convective flow for decay heat removal, minimal need for emergency power and a large negative reactivity feedback coefficient. These characteristics at EBR-II allow for ready application of computer diagnosis and control to demonstrate their effectiveness in response to simulated plant accidents. This latter testing objective is an important part in improvements in the man-machine interface

  14. Testing the efficiency of rover science protocols for robotic sample selection: A GeoHeuristic Operational Strategies Test

    Science.gov (United States)

    Yingst, R. A.; Bartley, J. K.; Chidsey, T. C.; Cohen, B. A.; Gilleaudeau, G. J.; Hynek, B. M.; Kah, L. C.; Minitti, M. E.; Williams, R. M. E.; Black, S.; Gemperline, J.; Schaufler, R.; Thomas, R. J.

    2018-05-01

    The GHOST field tests are designed to isolate and test science-driven rover operations protocols, to determine best practices. During a recent field test at a potential Mars 2020 landing site analog, we tested two Mars Science Laboratory data-acquisition and decision-making methods to assess resulting science return and sample quality: a linear method, where sites of interest are studied in the order encountered, and a "walkabout-first" method, where sites of interest are examined remotely before down-selecting to a subset of sites that are interrogated with more resource-intensive instruments. The walkabout method cost less time and fewer resources, while increasing confidence in interpretations. Contextual data critical to evaluating site geology was acquired earlier than for the linear method, and given a higher priority, which resulted in development of more mature hypotheses earlier in the analysis process. Combined, this saved time and energy in the collection of data with more limited spatial coverage. Based on these results, we suggest that the walkabout method be used where doing so would provide early context and time for the science team to develop hypotheses-critical tests; and that in gathering context, coverage may be more important than higher resolution.

  15. Computation Directorate 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Crawford, D L

    2009-03-25

    Whether a computer is simulating the aging and performance of a nuclear weapon, the folding of a protein, or the probability of rainfall over a particular mountain range, the necessary calculations can be enormous. Our computers help researchers answer these and other complex problems, and each new generation of system hardware and software widens the realm of possibilities. Building on Livermore's historical excellence and leadership in high-performance computing, Computation added more than 331 trillion floating-point operations per second (teraFLOPS) of power to LLNL's computer room floors in 2008. In addition, Livermore's next big supercomputer, Sequoia, advanced ever closer to its 2011-2012 delivery date, as architecture plans and the procurement contract were finalized. Hyperion, an advanced technology cluster test bed that teams Livermore with 10 industry leaders, made a big splash when it was announced during Michael Dell's keynote speech at the 2008 Supercomputing Conference. The Wall Street Journal touted Hyperion as a 'bright spot amid turmoil' in the computer industry. Computation continues to measure and improve the costs of operating LLNL's high-performance computing systems by moving hardware support in-house, by measuring causes of outages to apply resources asymmetrically, and by automating most of the account and access authorization and management processes. These improvements enable more dollars to go toward fielding the best supercomputers for science, while operating them at less cost and greater responsiveness to the customers.

  16. 25 CFR 175.5 - Operations manual.

    Science.gov (United States)

    2010-04-01

    ... Provisions § 175.5 Operations manual. (a) The Area Director shall establish an operations manual for the... Director shall amend the operations manual as needed. (b) The public shall be notified by the Area Director... shall be published in local newspaper(s) of general circulation, posted at the utility office(s), and...

  17. Asset Analysis and Operational Concepts for Separation Assurance Flight Testing at Dryden Flight Research Center

    Science.gov (United States)

    Costa, Guillermo J.; Arteaga, Ricardo A.

    2011-01-01

    A preliminary survey of existing separation assurance and collision avoidance advancements, technologies, and efforts has been conducted in order to develop a concept of operations for flight testing autonomous separation assurance at Dryden Flight Research Center. This effort was part of the Unmanned Aerial Systems in the National Airspace System project. The survey focused primarily on separation assurance projects validated through flight testing (including lessons learned), however current forays into the field were also examined. Comparisons between current Dryden flight and range assets were conducted using House of Quality matrices in order to allow project management to make determinations regarding asset utilization for future flight tests. This was conducted in order to establish a body of knowledge of the current collision avoidance landscape, and thus focus Dryden s efforts more effectively towards the providing of assets and test ranges for future flight testing within this research field.

  18. Experience in startup and operation of fast flux facility

    International Nuclear Information System (INIS)

    Moffitt, W.C.

    1980-01-01

    The testing program was structured to perform all testing under formal testing procedures with a test engineer as the test director and the plant operators operating the systems and equipment. This provided excellent training and experience for the operators in preparation for eventual reactor operation. Operations preparations for the testing and operation activities has consisted of academic training, formal on-the-job training including systems operation and examinations by persons with an expert knowledge on that portion of the plant, training at EBR-II and the High Temperature Sodium Facility for selected senior operators, operating procedure preparation, training on an FFTF Control Room operator training simulator, and formal written, oral and operating examinations

  19. Testing one model of family role in the development of formal operations

    Directory of Open Access Journals (Sweden)

    Stepanović Ivana

    2008-01-01

    Full Text Available Contemporary authors emphasise the importance of viewing the family as a specific educational context and of studying its role in the cognitive development. In this paper, we tested the model that postulates the way in which the different ways of parental mediation and various means of the family cultural-supportive system affect the development of formal operations. We assumed that the education of parents and financial status of the family form a wider context that influences the general dimensions of family interaction (emotional exchange and democratism, but also the cultural-pedagogical status of the family, and that their connection with formal operations is mediated by the above-mentioned variables. We expected the education of parents and general dimensions of family interaction to influence the parental mediation characteristic for the development of formal operations, operationalised by CSS scale, and to mediate, via this variable, the development of that form of thinking. The direct link with formal operations is postulated in the case of variables of cultural-pedagogical status and CSS scale. The sample consists of 305 pupils aged 15 to 19. The Structural Equation Modeling was used for testing the postulated model. The results show that there is a direct influence of cultural-pedagogical status and CSS scale on formal operations, but of mother's education as well. Some relations between other predictors were confirmed, and some not, which suggests that the proposed explanatory model must be revised to some degree.

  20. A versatile hydraulically operated respiratory servo system for ventilation and lung function testing.

    Science.gov (United States)

    Meyer, M; Slama, H

    1983-09-01

    A description is given of the design and performance of a microcomputer-controlled respiratory servo system that incorporates the characteristics of a mechanical ventilator and also allows the performance of a multitude of test procedures required for assessment of pulmonary function in paralyzed animals. The device consists of a hydraulically operated cylinder-piston assembly and solenoid valves that direct inspiratory and expiratory gas flow and also enable switching to different test gas sources. The system operates as a volume-flow-preset ventilator but may be switched to other operational cycling modes. Gas flow rates may be constant or variable. The system operates as an assister-controller and, combined with a gas analyzer, can function as a "demand" ventilator allowing for set-point control of end-tidal PCO2 and PO2. Complex breathing maneuvers for a variety of single- and multiple-breath lung function tests are automatically performed. Because of the flexibility in selection and timing of respiratory parameters, the system is particularly suitable for respiratory gas studies.

  1. Radiation monitoring data on the power-up test of HTTR. Results up to 20 MW operation

    International Nuclear Information System (INIS)

    Ashikagaya, Yoshinobu; Nakazawa, Takashi; Yoshino, Toshiaki; Yasu, Katsuji

    2002-01-01

    The High Temperature Engineering Test Reactor (HTTR) have completed the Power-up test of 9 MW (the single and parallel loaded operation) in the rated operation mode. After that the Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW (the single and parallel loaded operation) were performed between January 16, 2001 and June 10, 2001. This report describes the radiation monitoring data carried out during the HTTR Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW. The followings were concluded from these radiation monitoring data. The monitoring of radioactive gaseous effluents and the radiation protection for the works will be easy to do and the exposure dose of the workers will be kept the low level. (author)

  2. Simulation of Valve Operation for Flow Interrupt Test in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kim, Jae Hyung; Shin, Dae Yong; Shin, Dong Woo; Kim, Charn Jung; Lee, Jung Hee

    2012-01-01

    The valve used in nuclear power plant must be qualified for the function according to the KEPIC MF. The test valve must be selected by shape and size, which is given by KEPIC MF. In the functional test, the mathematical model for the valve operation is needed. The mathematical model must be verified by the test, whose method and procedure is defined in KEPIC MF. The lack of analytical technique has lead to the poor mathematical model, with which the functional test for the big valve is impossible with analytical method. Especially, the tank and rupture disk in the flow test is not considered and the result of the analysis is so different to the real one. In these days, the 3D model for the flow interrupt test makes more accurate analysis. And no facility about functional test reduces the research will for the nuclear power plant valve. For this problem, the test facility for the functional test of the valve and pump in nuclear power plant has been made until 2012. With the test facility, the research project related the valve were initiated in KIMM( Korea Institute of Machinery and Materials). And the joint project to SNU(Seoul National University) has been going on the numerical analysis for the valve in nuclear power plant. Using the commercial software and user subroutine, UDF, the co-simulation with multi-body dynamic and fluid flow analysis and the addition of tank and rupture disk to the user subroutine make possible to simulate the flow interrupt test numerically. This is not simple and regular analysis, which was introduced in user subroutine. In order to simulate the real situation, the engineering work, related mathematical model, and the programming in the user subroutine are needed. This study is on the making the mathematical model for the functional test of the valve in nuclear power plan. The functional test is the real test procedure and defined in KEPIC MF

  3. Straw man 900-1000 GeV crystal extraction test beam for Fermilab collider operation

    International Nuclear Information System (INIS)

    Carrigan, R.A. Jr.

    1996-10-01

    A design for a 900-1000 GeV, 100 khz parasitic test beam for use during collider operations has been developed. The beam makes use of two bent crystals, one for extraction and the other one for redirecting the beam in to the present Switchyard beam system. The beam requires only a few modifications in the A0 area and largely uses existing devices. It should be straight-forward to modify one or two beam lines in the fixed target experimental areas to work above 800 GeV. Possibilities for improvements to the design,to operate at higher fluxes are discussed

  4. German boiler and pressure vessel codes and standards: materials, manufacture, testing, equipment, erection and operation

    International Nuclear Information System (INIS)

    Steffen, H.P.

    1987-01-01

    The methods by which the safety objectives on the operation of steam boilers and pressure vessels in Germany can be reached are set out in Technical Rules which are compiled and established in technical committees. Typical applications are described in the Technical Rules. A chart shows how the laws, provisions and Technical Rules for the sections 'steam boiler plant' and 'pressure vessels' are interlinked. This chapter concentrates on legal aspects, materials, manufacture, testing, erection and operation of boilers and pressure vessels in Germany. (U.K.)

  5. Intermediate quality control tests in the development of a superconducting RF cryomodule for CW operation

    Science.gov (United States)

    Pattalwar, Shrikant; Jones, Thomas; Strachan, John; Bate, Robert; Davies, Phil; McIntosh, Peter

    2012-06-01

    Through an international cryomodule collaboration, ASTeC at Daresbury Laboratory has taken the primary responsibility in leading the development of an optimised Superconducting RF (SRF) cryomodule, operating in CW mode for energy recovery facilities and other high duty cycle accelerators. For high beam current operation, Higher Order Mode (HOM) absorbers are critical components of the SRF Cryomodule, ensuring excessive heating of the accelerating structures and beam instabilities are effectively managed. This paper describes some of the cold tests conducted on the HOM absorbers and other critical components during the construction phase, to ensure that the quality and reliable cryomodule performance is maintained.

  6. Industrial hygiene support of underground operations at the Nevada Test Site

    International Nuclear Information System (INIS)

    Porter, P.F.

    1992-01-01

    The Industrial Hygiene Section of the Health Protection Department provides industrial hygiene support of underground operations at the Nevada Test Site. This report describes support operations and summarizes the industrial hygiene data collected from July 31, 1989 through June 30, 1991. Air quality data were collected by means of personnel sampling by active and passive techniques using various kinds of industrial hygiene instrumentation and through localized and general area monitoring. The data collected were used to evaluate underground air quality and quantity requirements; evaluate worker exposures to a variety of air contaminants; determine the applicability and effectiveness of personal protective equipment

  7. Numerical simulations of the first operational conditions of the negative ion test facility SPIDER

    International Nuclear Information System (INIS)

    Serianni, G.; Agostinetti, P.; Antoni, V.; Baltador, C.; Chitarin, G.; Marconato, N.; Pasqualotto, R.; Sartori, E.; Toigo, V.; Veltri, P.; Cavenago, M.

    2016-01-01

    In view of the realization of the negative ion beam injectors for ITER, a test facility, named SPIDER, is under construction in Padova (Italy) to study and optimize production and extraction of negative ions. The present paper is devoted to the analysis of the expected first operations of SPIDER in terms of single-beamlet and multiple-beamlet simulations of the hydrogen beam optics in various operational conditions. The effectiveness of the methods adopted to compensate for the magnetic deflection of the particles is also assessed. Indications for a sequence of the experimental activities are obtained

  8. Test Hardware Design for Flightlike Operation of Advanced Stirling Convertors (ASC-E3)

    Science.gov (United States)

    Oriti, Salvatore M.

    2012-01-01

    NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, the Thermal Energy Conversion branch at GRC has been conducting extended operation of a multitude of free-piston Stirling convertors. The goal of this effort is to generate long-term performance data (tens of thousands of hours) simultaneously on multiple units to build a life and reliability database. The test hardware for operation of these convertors was designed to permit in-air investigative testing, such as performance mapping over a range of environmental conditions. With this, there was no requirement to accurately emulate the flight hardware. For the upcoming ASC-E3 units, the decision has been made to assemble the convertors into a flight-like configuration. This means the convertors will be arranged in the dual-opposed configuration in a housing that represents the fit, form, and thermal function of the ASRG. The goal of this effort is to enable system level tests that could not be performed with the traditional test hardware at GRC. This offers the opportunity to perform these system-level tests much earlier in the ASRG flight development, as they would normally not be performed until fabrication of the qualification unit. This paper discusses the requirements, process, and results of this flight-like hardware design activity.

  9. Test Hardware Design for Flight-Like Operation of Advanced Stirling Convertors

    Science.gov (United States)

    Oriti, Salvatore M.

    2012-01-01

    NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, the Thermal Energy Conversion branch at GRC has been conducting extended operation of a multitude of free-piston Stirling convertors. The goal of this effort is to generate long-term performance data (tens of thousands of hours) simultaneously on multiple units to build a life and reliability database. The test hardware for operation of these convertors was designed to permit in-air investigative testing, such as performance mapping over a range of environmental conditions. With this, there was no requirement to accurately emulate the flight hardware. For the upcoming ASC-E3 units, the decision has been made to assemble the convertors into a flight-like configuration. This means the convertors will be arranged in the dual-opposed configuration in a housing that represents the fit, form, and thermal function of the ASRG. The goal of this effort is to enable system level tests that could not be performed with the traditional test hardware at GRC. This offers the opportunity to perform these system-level tests much earlier in the ASRG flight development, as they would normally not be performed until fabrication of the qualification unit. This paper discusses the requirements, process, and results of this flight-like hardware design activity.

  10. Operation and control strategies in pre-series testing of cold circulating pumps for ITER

    International Nuclear Information System (INIS)

    Bhattacharya, R.; Vaghela, H.; Sarkar, B.; Srinivas, M.; Choukekar, K.

    2013-01-01

    Cryo-distribution system of ITER is responsible for the distribution and control of forced-flow supercritical helium for cooling of the superconducting magnets and the cryo-pumps. The requirements of cold circulating pumps (CCP) for mass flow rates and performance are much higher than presently existing and commercially available one used at 4.0 K helium. Design up-scaling with pre-series test of CCP has been proposed including test infrastructure. Operation and control strategies for the test distribution box (TDB) of test infrastructure have been developed and analyzed using steady state and dynamic process simulation to cope with the functional requirements of CCPs. Off-normal scenario with CCP inlet pressure variation is an important concern, dynamic process responses during such scenario have been evaluated to verify the operability of CCP. The paper describes process simulation to cope with the functional requirements of CCPs along with evaluation of off-normal scenario to verify the operability of CCP. (author)

  11. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  12. Study on the Correlation between PSR and Korean Stress Test for Continued Operation of Aging NPP

    International Nuclear Information System (INIS)

    Chung, June Ho; Kim, Tae Ryong

    2013-01-01

    Nuclear Safety and Security Commission (NSSC), Korean nuclear regulatory authority established the stress test guideline based on the EU stress test, and KHNP prepared the execution plan in response to the guideline for the CO of Kori Unit 1 and Wolsong Unit 1. PSR is a comprehensive safety review program for long term operation of NPP, which was developed by IAEA. Korea adopted PSR in 1999 as the regulatory requirement for CO of NPP. The IAEA standard guideline for PSR program was updated in 2003. However, the Korean PSR has not been revised yet to apply the new IAEA guidelines. Additionally, national legal systems and guidelines associated with the adoption of stress tests are urgently required as well. These revisions are imperative in order to ensure the reliability of NPPs, and to promote public acceptance and understanding. This study presents the technical basis and proposals for review actions necessary to address the issues and controversies surrounding the continued operation and decommissioning of aging NPPs in Korea. As discussed earlier in characteristics of Korean Stress Test, it is more comprehensive than the EU Stress Test in terms of its multilateral evaluation which includes equipment durability, plant operation, human factors, and safety margins, hence substantially raising the significance and value of the evaluation process. Thus, the addition of Korean Stress Test to the existing Korean Evaluation of CO is expected to greatly increase the quality of safety assessment of aging NPPs in Korea due to its stricter safety policies, hence providing a more meaningful evaluation process. However, a one-time application of the Korean Stress Test to only Kori Unit 1 and Wolsong Unit 1 would be a waste of the great effort that has been done thus far to improve the Korean Evaluation of CO and develop the Korean Stress Test. By extending the Korean Stress Test to all NPPs in Korea would maintain and ensure the reliability of NPPs as well as public

  13. Excerpts from the introductory statement by IAEA Director General. IAEA Board of Governors, Vienna, 8 June 1998

    International Nuclear Information System (INIS)

    ElBaradei, M.

    1998-01-01

    The document contains excerpts from the Introductory Statement made by the Director General of the IAEA at the IAEA Board of Governors on 8 June 1998. The following aspects from the Agency's activity are presented: nuclear testing, technical co-operation, programme and budget, safeguards, safeguards implementation report, Agency's involvement in safeguards verification in the Democratic People's Republic of Korea (DPRK), Agency's inspections in Iraq in relation to its clandestine nuclear programme, security of material, measures to strengthen international co-operation in nuclear, radiation and waste safety, study of the radiological situation at the atolls of Mururoa and Fangataufa, and Agency's role in safety assessment of the Mochovce nuclear power plant

  14. Why so few Women on Boards of Directors?

    DEFF Research Database (Denmark)

    Smith, Nina; Parrotta, Pierpaolo

    2015-01-01

    This paper analyzes the determinants of women’s representation on boards of directors based on a panel of all privately owned or listed Danish firms with at least 50 employees observed during the period 1998–2010. We focus on the directors who are not elected by the employees and test three...... nonemployee-elected female board members. We also find clear evidence of a tokenism behavior in Danish companies. The likelihood of enlarging the share of non-employee-elected female board members is significantly smaller if one, two, or more women have sat on the board of directors. Finally, the pipeline...... suggests that an important way to increase the female proportion of non-employee-elected board members is that more women reach top executive positions....

  15. Gas spark switches with increased operating life for Marx generator of lightning test complex

    Energy Technology Data Exchange (ETDEWEB)

    Bykov, Yu. A.; Krastelev, E. G., E-mail: ekrastelev@yandex.ru [Russian Academy of Sciences, Joint Institute for High Temperature (Russian Federation)

    2016-12-15

    A new design of gas spark switches with an increased operating life and stable dynamic characteristics for the Marx generator of the lightning test complex has been developed. The switches are characterized by the following parameters in the mode of operation: voltage up to 80 kV, discharge current up to 50 kA, flowing charge up to 3.5 C/pulse. An increased operating life is achieved by using torus-shaped electrodes with increased working surface area and a trigger electrode in the form of a thick disk with a hole located between them. Low breakdown delay time and high stability of breakdown voltage under dynamic conditions are provided by gas preionization in the spark gap using UV radiation of an additional corona discharge in the axial region.

  16. Dynamic Sampling of Trace Contaminants During the Mission Operations Test of the Deep Space Habitat

    Science.gov (United States)

    Monje, Oscar; Valling, Simo; Cornish, Jim

    2013-01-01

    The atmospheric composition inside spacecraft during long duration space missions is dynamic due to changes in the living and working environment of crew members, crew metabolism and payload operations. A portable FTIR gas analyzer was used to monitor the atmospheric composition within the Deep Space Habitat (DSH) during the Mission Operations Test (MOT) conducted at the Johnson Space Center (JSC). The FTIR monitored up to 20 gases in near- real time. The procedures developed for operating the FTIR were successful and data was collected with the FTIR at 5 minute intervals. Not all the 20 gases sampled were detected in all the modules and it was possible to measure dynamic changes in trace contaminant concentrations that were related to crew activities involving exercise and meal preparation.

  17. Final test results for the ground operations demonstration unit for liquid hydrogen

    Science.gov (United States)

    Notardonato, W. U.; Swanger, A. M.; Fesmire, J. E.; Jumper, K. M.; Johnson, W. L.; Tomsik, T. M.

    2017-12-01

    Described herein is a comprehensive project-a large-scale test of an integrated refrigeration and storage system called the Ground Operations and Demonstration Unit for Liquid Hydrogen (GODU LH2), sponsored by the Advanced Exploration Systems Program and constructed at Kennedy Space Center. A commercial cryogenic refrigerator interfaced with a 125,000 l liquid hydrogen tank and auxiliary systems in a manner that enabled control of the propellant state by extracting heat via a closed loop Brayton cycle refrigerator coupled to a novel internal heat exchanger. Three primary objectives were demonstrating zero-loss storage and transfer, gaseous liquefaction, and propellant densification. Testing was performed at three different liquid hydrogen fill-levels. Data were collected on tank pressure, internal tank temperature profiles, mass flow in and out of the system, and refrigeration system performance. All test objectives were successfully achieved during approximately two years of testing. A summary of the final results is presented in this paper.

  18. High-power test of S-band klystron for long-pulse operation

    International Nuclear Information System (INIS)

    Morii, Y.; Oshita, E.; Abe, S.; Keishi, T.; Tomimasu, T.; Ohkubo, Y.; Yoshinao, M.; Yonezawa, H.

    1994-01-01

    FELI(Free Electron Laser Research Institute, Inc.) is constructing a free electron laser facility covering from 20μm (infra red region) to 0.35μm (ultra violet region), using an S-band linac. The linac is commissioning now. An RF system of the linac for FELs is required of long pulse duration and high stability. S-band klystrons (TOSHIBA E3729) of the FELI linac are operated in three pulse operation modes (pulse width and peak RF power; 24μs-24MW, 12.5μs-34MW, 0.5μs-70MW). The S-band klystron and its modulator were combined to test their performance. The high power test results of the S-band klystron are summarized in this paper. (author)

  19. Operation Aqueduct: Onsite radiological safety report for announced nuclear tests, October 1989--September 1990

    International Nuclear Information System (INIS)

    Hernandez, G.M.; Jacklin, A.K.

    1992-01-01

    Aqueduct was the name assigned to the series of underground nuclear weapons tests conducted at the Nevada Test Site (NTS) from October 1, 1989, through September 30, 1990. This report includes those experiments publicly announced. Remote radiation measurements were taken during and after each nuclear event by a telemetry system. Reynolds Electrical ampersand Engineering Co., Inc. (REECO) Health Protection Department (HPD) Radiation Protection Technicians (RPTS) with portable radiation detection instruments surveyed reentry routes into ground zeros (GZ) before other planned entries were made. Continuous surveillance was provided while personnel were in radiation areas and appropriate precautions were taken to protect persons from unnecessary exposure to radiation and toxic gases. Protective clothing and equipment were issued as needed. Complete radiological safety and industrial hygiene (IH) coverage was provided during drilling and mineback operations. Telemetered and portable radiation detector measurements are listed. Detection instrumentation used is described and specific operational procedures are defined

  20. Operational experience with the JET beryllium evaporators in the J1W test bed

    International Nuclear Information System (INIS)

    Peacock, A.T.; Dietz, K.J.; Israel, G.; Jensen, H.S.; Johnson, A.; Pick, M.A.; Saibene, G.; Sartori, R.

    1989-01-01

    Four beryllium evaporators were fitted onto the JET vessel during March 1989. These evaporators are planned to give the first introduction of beryllium into the JET machine to study the effect of using beryllium as a first wall material. Over 200 hours operational experience with such an evaporator had been gained on a test bed facility in which the evaporation rate, radial evaporant distribution and head operating temperature had been determined. The results obtained on this facility with two different heat materials, sintered S-65B and vacuum cast beryllium are described. The test vessel has also been used to conduct beryllium wall pumping experiments using the ''Langmuir effect''. The initial results of these experiments will be described. (author)