  1. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  2. Effects of Business Model Development Projects on Organizational Culture: A Multiple Case Study of SMEs

    Directory of Open Access Journals (Sweden)

    Ulla Santti

    2017-08-01

    Full Text Available Previous research has shown that links between organizational culture and innovativeness/performance may act as a “social glue” that helps a company develop organizational culture as a competitive advantage. In this study of three case companies, the organizational culture change due business model development projects is studied using the Competing Values Framework (CVF tool and interviews with respondents about discovered changes. To reveal intervention and implied effects between business model development project and organizational culture changes, we used CIMO logic (context, intervention, mechanism, and outcome to bridge practice and theory by explanatory, backward-looking research. Our case studies of companies in relatively short-duration business model development projects indicate that organizational culture may have some dynamic characteristics, for example, an increase of the adhocracy organizational type in all case companies or an increase in the hierarchical leadership type in one case company. Thus, the development of an organizational culture type can be partly controlled. Our results also indicated business model development projects do have a minor effect on organizational culture, even when development activities have not been put fully into practice. However, the more comprehensively business model development project activities have been put into practice, the larger the effect on organizational culture.

  3. Lessons learned applying CASE methods/tools to Ada software development projects

    Science.gov (United States)

    Blumberg, Maurice H.; Randall, Richard L.

    1993-01-01

    This paper describes the lessons learned from introducing CASE methods/tools into organizations and applying them to actual Ada software development projects. This paper will be useful to any organization planning to introduce a software engineering environment (SEE) or evolving an existing one. It contains management level lessons learned, as well as lessons learned in using specific SEE tools/methods. The experiences presented are from Alpha Test projects established under the STARS (Software Technology for Adaptable and Reliable Systems) project. They reflect the front end efforts by those projects to understand the tools/methods, initial experiences in their introduction and use, and later experiences in the use of specific tools/methods and the introduction of new ones.

  4. Performance assessment and the safety case: Lessons from recent international projects and areas for further development

    International Nuclear Information System (INIS)

    Galson, Daniel A.; Bailey, Lucy

    2014-01-01

    The European Commission (EC) PAMINA project - Performance Assessment Methodologies in Application to Guide the Development of the Safety Case - was conducted over the period 2006-2009 and brought together 27 organisations from 10 countries. PAMINA had the aim of improving and developing a common understanding of performance assessment (PA) methodologies for disposal concepts for spent fuel and other long-lived radioactive wastes in a range of geological environments. This was followed by a Nuclear Energy Agency (NEA) sponsored project on Methods for Safety Assessment of Geological Disposal Facilities for Radioactive Waste (MeSA), which was completed in 2012. This paper presents a selection of conclusions from these projects, in the context of general understanding developed on what would constitute an acceptable safety case for a geological disposal facility, and outlines areas for further development. The paper also introduces a new project on PA that is under consideration within the context of the EC Implementing Geological Disposal of Radioactive Waste Technology Platform (IGD-TP). (authors)

  5. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  6. NASA's TReK Project: A Case Study in Using the Spiral Model of Software Development

    Science.gov (United States)

    Hendrix, T. Dean; Schneider, Michelle P.

    1998-01-01

    Software development projects face numerous challenges that threaten their successful completion. Whether it is not enough money, too little time, or a case of "requirements creep" that has turned into a full sprint, projects must meet these challenges or face possible disastrous consequences. A robust, yet flexible process model can provide a mechanism through which software development teams can meet these challenges head on and win. This article describes how the spiral model has been successfully tailored to a specific project and relates some notable results to date.

  7. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  8. Developing Routines in Large Inter-organisational Projects: A Case Study of an Infrastructure Megaproject

    Directory of Open Access Journals (Sweden)

    Therese Eriksson

    2015-08-01

    Full Text Available General management research has increasingly recognised the significance of routines in organisational performance. Among organisational tasks, megaprojects depend more on routines selected and created within the project than standard, small-scale projects do, owing largely to their size, duration, and uniqueness. Within this context, the present paper investigates how project routines were established and developed during the early design phase of an inter-organisational megaproject. A case study of a large public infrastructure project was conducted, in which data were collected during observations, semi-structured interviews, and project document studies over the course of three years. Results of analysis revealed that the client exerted the greatest impact on choice of routines and that the temporary nature of tasks limited efforts to fine-tune routines. Changes in routines were primarily reactive to new knowledge concerning project needs. The findings suggest that meta-routines to consciously review routines should be used to a greater extent and designed to capture supplier experiences as well.

  9. From cases to projects in problem-based medical education

    Directory of Open Access Journals (Sweden)

    Diana Stentoft

    2014-06-01

    Full Text Available Problem-based learning (PBL based on patient cases has become a well-established worldwide educational approach in medical education. Recent studies indicate that case-based PBL when used throughout an entire curriculum may develop into a counter-productive routine for students as well as teachers. Consequently, there is a need to develop PBL approaches further allowing students to work with more ill-defined problems and alternative learning structures. In this paper, we argue that this can be realised by introducing project-PBL into the medical curriculum, as in the medical education at Aalborg University, Denmark. We outline organisations of case- and project- PBL in the medical curriculum and present an explorative study of 116 first and second year students’ experiences working in the two settings of PBL. Results reveal that students generally rate their PBL experiences positively however, project-PBL is rated more positively than case-PBL on all parameters studied. These results invite further consideration of the differences in working with cases and projects. Two central differences are discussed; the nature of the problem as the trigger of learning and students' possibilities for directing their own learning processes. The study demonstrates that introducing project-PBL may contribute significantly in problem-based medical education. However, the need for extensive research into advantages and limitations of the combined use of case- and project-PBL is also emphasised.

  10. Disruptive Innovation Patterns Driven by Mega-Projects: A Sustainable Development Pattern Case of China’s High-Speed Rail

    Directory of Open Access Journals (Sweden)

    Bingxiu Gui

    2018-04-01

    Full Text Available Sustainable development of mega-projects has drawn many concerns around the world. The theory of disruptive innovation in mega-projects is a typical sustainable development pattern but still lacks systematic understanding. This article takes China’s high-speed rail (CHSR project as an example to analyze the disruptive innovation pattern of mega-projects. First, this paper systematically traces the theories of disruptive innovation and summarizes the connotations of disruptive innovation. Simultaneously, from the historical development of several typical mega-projects in China, this paper summarizes the connotations of mega-projects. Based on two connotations, this paper summarizes the theoretical basis of disruptive innovation in mega-projects. Second, this paper takes the CHSR project as a case to analyze its innovation pattern from the analysis of the development process, operation mechanism and influence in sustainability; the disruptive innovation pattern is put forward afterward. Third, the discussion is drawn from the perspectives of the characteristics, scope of application and innovation environment of the disruptive innovation of CHSR. Last, the conclusions of this article are summarized.

  11. Effects of Business Model Development Projects on Organizational Culture: A Multiple Case Study of SMEs

    OpenAIRE

    Ulla Santti; Tuomo Eskelinen; Mervi Rajahonka; Kaija Villman; Ari Happonen

    2017-01-01

    Previous research has shown that links between organizational culture and innovativeness/performance may act as a “social glue” that helps a company develop organizational culture as a competitive advantage. In this study of three case companies, the organizational culture change due business model development projects is studied using the Competing Values Framework (CVF) tool and interviews with respondents about discovered changes. To reveal intervention and implied effects between business...

  12. Project Oasis : A Case Study in Jamaican Development Administration

    NARCIS (Netherlands)

    Gayle, Dennis J.; Drori, Israel D.

    1984-01-01

    This paper is concerned with development administration in practice, at the level of a particular project which was implemented in the Caribbean island of Jamaica in 1979. We are essentially concerned with the problem of the degree of fit between operational project objectives and the management of

  13. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    Directory of Open Access Journals (Sweden)

    Debadyuti Das

    2017-12-01

    Full Text Available The present work attempts to identify critical success factors (CSFs influencing the performance of development projects based on their key performance indicators (KPIs. It has considered the case of Constituency Development Fund (CDF projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items constituting these six factors represent six CSFs namely project-related, client-related, consultant-related, contractor-related, supply chain-related, and external environment-related factor. The findings are also relevant to development projects undertaken in other developing countries.

  14. Local Responses to Development and Conservation Projects - A case study in Río San Juan, Nicaragua

    OpenAIRE

    Dahlbom, Sanne

    2007-01-01

    Based on a case study in the buffer zone to the Biological Reserve Indio-Maíz, Nicaragua, and by employing an actor-oriented approach, this thesis sets out to explore how locals respond to conservation and development projects, and what factors facilitate these responses. It will be argued that differentiation in people’s capitals, such as access to wider social networks and information, capability to adapt to changes in livelihoods and deal with project requirements, as well as coping with i...

  15. ACACIA Project - Development of a Post-Combustion CO2 Capture Process. Case of the DMXTM Process

    International Nuclear Information System (INIS)

    Gomez, A.; Briot, P.; Raynal, L.; Broutin, P.; Gimenez, M.; Soazic, M.; Cessat, P.; Saysset, S.

    2014-01-01

    The objective of the ACACIA project was to develop processes for post-combustion CO 2 capture at a lower cost and with a higher energetic efficiency than first generation processes using amines such as Monoethanolamine (MEA) which are now considered for the first Carbon Capture and Storage (CCS) demonstrators. The partners involved in this project were: Rhodia (Solvay since then), Arkema, Lafarge, GDF SUEZ, Veolia Environnement, IFP Energies nouvelles, IRCE Lyon, LMOPS, LTIM, LSA Armines. To validate the relevance of the breakthrough processes studied in this project, techno-economic evaluations were carried out with comparison to the reference process using a 30 wt% MEA solvent. These evaluation studies involved all the industrial partners of the project, each partner bringing specific cases of CO 2 capture on their industrial facilities. From these studies, only the process using de-mixing solvent, DMX TM , developed by IFPEN appears as an alternative solution to the MEA process. (authors)

  16. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    OpenAIRE

    Debadyuti Das; Christopher Ngacho

    2017-01-01

    The present work attempts to identify critical success factors (CSFs) influencing the performance of development projects based on their key performance indicators (KPIs). It has considered the case of Constituency Development Fund (CDF) projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items co...

  17. Governance factors enabling knowledge transfer in interorganisational development projects

    NARCIS (Netherlands)

    Bosch-Sijtsema, Petra M.; Postma, Theo J. B. M.

    2010-01-01

    In this study we examine governance factors affecting knowledge transfer in interorganisational development projects. There is a gap in the literature indicating a need for more insights into processes of knowledge sharing and governance of interorganisational development projects. By using cases

  18. Impact of Community Driven Development Project: A Case of ...

    African Journals Online (AJOL)

    This paper evaluates impact of Community Driven Development programme on infrastructure under National Fadama II Project in Oyo State Nigeria. Data were collected from two hundred and sixty-four farmers using multistage sampling procedures. Data were analyzed using descriptive statistics and infrastructure index.

  19. Assessment of Project Website Sustainability: Case of the Arctic EIA Project

    Directory of Open Access Journals (Sweden)

    Sonja H Bickford

    2016-07-01

    Full Text Available In many cases, temporary websites may be simple, accessible solutions for knowledge management and dissemination of information. However, such sites may become outdated as the funding ends, but yet in many cases, still publicly available through the Internet. The issue of website sustainability is a relevant topic for all organizations that have websites. Website lifecycle, knowledge management, and website sustainability issues are discussed through a theoretical-based literature review. These issues are then summarized and used as lessons learned for the case study approach of this paper. The aim is to identify a solution to address a website’s life and longevity, post project. A practical case study assessment of the issue of project website sustainability is needed to address the website’s longevity—post project—as creation is often made through temporary endeavors. Recommendations for future project websites are made as the outcomes and results of this study and are expressed in the form of suggested practices for project website sustainability in future projects.

  20. Technology Uncertainty and Project Managers' Information Sharing - A comparative case study of two new product development projects

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Dietrich, Perttu

    2014-01-01

    uncertainty during various phases of new product development (NPD) projects. In this study, we compare two longitudinal NPD sub-projects that differ in uncertainty within the same large NPD project, in which the data source is the complete email exchange between a project manager and various actors...... (consisting of 3979 emails). The results show high levels of information sharing with the customer in both the early and late phases of high uncertainty. Interestingly, in the low uncertainty project, information sharing with the production department and the supplier is higher during the late phase...... of the NPD project. Unexpectedly, in both sub-projects, the project manager shares information with a wider range of both intra- and inter-organization actors in the early phases of the projects than in the late phases....

  1. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  2. Project Management in Public Administration. TPM – Total Project Management Maturity Model. The Case of Slovenian Public Administration

    Directory of Open Access Journals (Sweden)

    Gordana ŽURGA

    2018-02-01

    Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.

  3. An Empirical Study of Capability Development within Product Innovation Projects

    Directory of Open Access Journals (Sweden)

    Alireza Javanmardi Kashan

    2015-04-01

    Full Text Available The objective of this paper is to develop insights into firms’ strategic capability development processes within product innovation projects. In particular, the research aims at investigating the interactions among product innovation, knowledge processes, and capability development within firms. Building on qualitative data from the auto-industry, our analysis reveals that across four product innovation projects, the case company developed architectural knowledge and capability. Findings reveal that, along with changes at each level of product architecture, “design knowledge” and “design capability” have been developed at the same level of product architecture, leading to capability development at that level. Furthermore, findings suggest that such capability transformation resulting from knowledge and capability creation over the course of case projects leads to modularization of product architecture. Overall, the research contributes to identifying and emphasizing the role of micro processes in capability development and renewal, which in turn enhances our understanding of strategic capability development processes.

  4. Methodologies Developed for EcoCity Related Projects: New Borg El Arab, an Egyptian Case Study

    Directory of Open Access Journals (Sweden)

    Carmen Antuña-Rozado

    2016-08-01

    Full Text Available The aim of the methodologies described here is to propose measures and procedures for developing concepts and technological solutions, which are adapted to the local conditions, to build sustainable communities in developing countries and emerging economies. These methodologies are linked to the EcoCity framework outlined by VTT Technical Research Centre of Finland Ltd. for sustainable community and neighbourhood regeneration and development. The framework is the result of a long experience in numerous EcoCity related projects, mainly Nordic and European in scope, which has been reformulated in recent years to respond to the local needs in the previously mentioned countries. There is also a particular emphasis on close collaboration with local partners and major stakeholders. In order to illustrate how these methodologies can support EcoCity concept development and implementation, results from a case study in Egypt will be discussed. The referred case study relates to the transformation of New Borg El Arab (NBC, near Alexandria, into an EcoCity. The viability of the idea was explored making use of different methodologies (Roadmap, Feasibility Study, and Residents Energy Survey and Building Consumption Assessment and considering the Residential, Commercial/Public Facilities, Industrial, Services/Utilities, and Transport sectors.

  5. Applying CASE Tools for On-Board Software Development

    Science.gov (United States)

    Brammer, U.; Hönle, A.

    For many space projects the software development is facing great pressure with respect to quality, costs and schedule. One way to cope with these challenges is the application of CASE tools for automatic generation of code and documentation. This paper describes two CASE tools: Rhapsody (I-Logix) featuring UML and ISG (BSSE) that provides modeling of finite state machines. Both tools have been used at Kayser-Threde in different space projects for the development of on-board software. The tools are discussed with regard to the full software development cycle.

  6. CONTRIBUTIONS OF CAD / CAE TECHNOLOGY IN DEVELOPMENT PROJECTS OF AGRICULTURAL MACHINERY AND IMPLEMENTS: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Flavio Ricci Martinez

    2017-12-01

    Full Text Available This work aims to understand the contributions of CAD / CAE technology development projects Agricultural Machinery and Implements. The segment of Agricultural Machinery and Implements part of capital goods, which provides items that will be used to produce goods and services in other sectors and that is strategic in many economically and for innovation and technological diffusion in the country sector. To achieve the proposed objective a case study was conducted at a manufacturer of this type of product (combines, planters, tractors, etc. located in the region of Ribeirão Preto. Among the main contributions can excel found to reduce the time and costs of the project, the largest customer interaction, integration with the staff and the increased ability to test alternative solutions for solving problems.

  7. On a Use Case Points Measurement Tool for Effective Project Management

    OpenAIRE

    Inoue, Katsuro; Kusumoto, Shinji; Tsuda, Michio

    2007-01-01

    Use case point (UCP) method has been proposed to estimate software development effort in early phase of software project and used in a lot of software organizations. This paper briefly describes an automatic use case measurement tool, called U-EST.

  8. Project-Based Management Development: "The Volvo Story."

    Science.gov (United States)

    Branch, John; Smith, Bryan

    1992-01-01

    A modular group project-based approach to management development was implemented by Volvo Concessionaires (United Kingdom) in partnership with training consultants. Ingredients of its success included top-level commitment, investment in diagnosis and tailoring, and use of company-specific case studies. (SK)

  9. Case study: I-95 Landfill gas recovery project Fairfax County, Virginia

    International Nuclear Information System (INIS)

    McGuigan, M.J.; Peterson, E.R.; Smithberger, J.M.; Owen, W.L.

    1993-01-01

    This paper presents a case study of the landfill gas (LFG) recovery project at the I-95 Landfill in Fairfax County, Virginia. The project originally was conceived more than 10 years ago and has overcome numerous obstacles enroute to its present success. The efforts of the landfill owner (Fairfax County) and the project developer (Michigan Cogeneration Systems, Inc.) to surmount these obstacles are presented

  10. Open Crowdsourcing: Leveraging Community Software Developers for IT Projects

    Science.gov (United States)

    Phair, Derek

    2012-01-01

    This qualitative exploratory single-case study was designed to examine and understand the use of volunteer community participants as software developers and other project related roles, such as testers, in completing a web-based application project by a non-profit organization. This study analyzed the strategic decision to engage crowd…

  11. Evaluation and selection of CASE tool for SMART OTS development

    International Nuclear Information System (INIS)

    Park, K. O; Seo, S. M.; Seo, Y. S.; Koo, I. S.; Jang, M. H.

    1999-01-01

    CASE(Computer-Aided Software Engineering) tool is a software that aids in software engineering activities such as requirement analysis, design, testing, configuration management, and project management. The evaluation and selection of commercial CASE tools for the specific software development project is not a easy work because the technical ability of an evaluator and the maturity of a software development organization are required. In this paper, we discuss selection strategies, characteristic survey, evaluation criteria, and the result of CASE tool selection for the development of SMART(System-integrated Modular Advanced ReacTor) OTS(Operator Training Simulator)

  12. The advanced software development workstation project

    Science.gov (United States)

    Fridge, Ernest M., III; Pitman, Charles L.

    1991-01-01

    The Advanced Software Development Workstation (ASDW) task is researching and developing the technologies required to support Computer Aided Software Engineering (CASE) with the emphasis on those advanced methods, tools, and processes that will be of benefit to support all NASA programs. Immediate goals are to provide research and prototype tools that will increase productivity, in the near term, in projects such as the Software Support Environment (SSE), the Space Station Control Center (SSCC), and the Flight Analysis and Design System (FADS) which will be used to support the Space Shuttle and Space Station Freedom. Goals also include providing technology for development, evolution, maintenance, and operations. The technologies under research and development in the ASDW project are targeted to provide productivity enhancements during the software life cycle phase of enterprise and information system modeling, requirements generation and analysis, system design and coding, and system use and maintenance. On-line user's guides will assist users in operating the developed information system with knowledge base expert assistance.

  13. What is ′Successful Development′ in Conservation and Development Projects? Insights from Two Nicaraguan Case Studies

    Directory of Open Access Journals (Sweden)

    Sandra K Znajda

    2014-01-01

    Full Text Available The lack of clear indications of success in integrated conservation and development projects has resulted in strong criticisms of these projects, and a call for the return to conservation activities that exclude local communities. Impeding this discussion is the lack of clarity around how project success is defined and measured in conservation and development projects, especially in terms of development goals. This study involved an in-depth exploration of two agroforestry-focused conservation and development projects in Nicaragua to provide insights into how success in reaching development goals is interpreted in such projects. In both projects, development was equated with increased household income, in contrast to more contemporary definitions that include aspects such as self-respect and social integration. Both projects in turn relied on income as a measure of development success, which ultimately lessened attention to impacts not easily measured quantitatively as well as participant perspectives on desired goals. The paper concludes with a discussion of implications for conservation practitioners; specifically the need for better alignment of project goals with contemporary explanations of development, and a need to move beyond primarily numerical indicators to measure change through an interdisciplinary approach in order to have a more comprehensive understanding of project impacts.

  14. Project Investment and Project Financing: A study on Business Case and Financing Models

    OpenAIRE

    Wang, Simiao

    2012-01-01

    Uncertainty is a very significant factor that must be taken into consideration in project front-end phase management. By taking into uncertainty, the planners can to a great extent make sure that the business case could be accurate between specific intervals, hence business case can be based on to make decision. In a highly uncertain environment; the project sponsors should prefer other means to finance the project rather than using debt. Risk management is extremely important in project fina...

  15. Problems with Reporting and Evaluating Mining Industry Community Development Projects: A Case Study from Tanzania

    Directory of Open Access Journals (Sweden)

    Esther Wangari

    2012-02-01

    Full Text Available Reporting on contributions to community development is one way gold mining companies communicate the expanse and depth of their commitment to social responsibility. These projects are intended to provide the mine-proximate communities with some of the wealth and other benefits generated by mine development in their locales. We raise questions about reporting and evaluation of community development projects undertaken by AngloGold Ashanti in the two communities of Nyakabale and Nyamalembo, near its Geita mining projects in the Lake Victoria goldfields of Tanzania. We use archival data and data obtained from field research conducted during different periods throughout 2005, 2007 and 2010 to compare what the company reports to have done with what is found on the ground. Our findings revealed that the corporate reporting is misleading, ambiguous, and omissive. Much of the effort labeled “community development” benefited the companies directly via infrastructure development, food supplies to the mine cafeteria, and worker health. We argue that, if Corporate Social Responsibility (CSR projects are to be the primary way local people directly benefit from mine development, the relationship between the value of those projects and the wealth taken from the location should be considered, community projects should be well defined and differentiated from company-oriented projects, and community representatives should participate in monitoring the success and impact of community development projects.

  16. Business Cases for Major Public Infrastructure Projects in Canada

    Directory of Open Access Journals (Sweden)

    Mario Iacobacci

    2017-11-01

    Full Text Available When governments announce that they are going to spend vast sums of taxpayers’ money on a new public infrastructure project, you can be certain they will praise all the terrific new benefits that the project will bring to citizens, making everyone’s life easier, safer, greener and better. But this does not tell us whether we are better off as a society, after accounting for the cost of these projects borne by taxpayers today and well into the future. In reality, there is a meaningful risk that a project undertaken without a proper business case could end up making citizens’ lives worse. That new commuter train might look sleek and shiny and seem convenient for some, but a close business case analysis of recent transit projects in Canada’s three largest cities suggests that in as many as four cases out of 21 projects, the burden of paying for the projects does not justify the public investment. In a review of thirteen recent public transit projects in the Greater Toronto and Hamilton Area (GTHA, at least three projects had benefits that fell short of the costs. Yet, all three projects went ahead (or have been funded. Only one project showed large net benefits for citizens once all considerations were accounted for. Three projects showed small net benefits – of a size that can be easily offset by a modest cost over-run. The six remaining projects did not have any publicly available business cases. In the Greater Montreal area, a review of three recent major transit projects turned up no evidence of a publicly available business case for any of them. As a result, Montrealers are in the dark as to how much benefit or value destruction the three projects are responsible for. Things are far more encouraging in Vancouver, however, where three out of the five major transit projects undertaken or funded in recent years were backed by business cases showing a net benefit. Only one project did not show a net benefit and one project did not have a

  17. Understanding and Managing Process Interaction in IS Development Projects

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel

    2005-01-01

    Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage......-technical innovation in a situation where the organisational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage...... the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organisational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental...

  18. The dilemma of BME research projects in developing countries: a case study.

    Science.gov (United States)

    Zahedi, Edmond; Attar, Hamid Movahedian

    2011-01-01

    Researchers are faced with huge challenges when undertaking BME research projects in developing countries. Various administrative, technical, economic and even cultural barriers have to be overcome whereas the quality and quantity of the output has to be comparable with the developed world in order to make results publishable. This paper uses a real project context to highlight the major problems and the necessity of a holistic approach which would take into consideration all stakeholders interests. It is only by tackling problems such as relationship between academia-industry and administration efficiency at their root that significant progress can be achieved.

  19. Stimuli of Collaboration in Product Development: A Case Study in a Project Manufacturing Company

    Directory of Open Access Journals (Sweden)

    Jääskeläinen Aki

    2017-12-01

    Full Text Available There is already a wide acceptance on the importance of involving supplier and customer companies in product development. Decent understanding prevails on the relationship-oriented approach to product development including various collaboration forms. However, there is less research on the factors explaining the decision of attending to joint product development. In addition, less studies have examined the integrated role of both suppliers and customers in product development initiatives. This study searches answers to the following research questions: 1. What is the role of different actors in product development initiatives? 2. What factors motivate suppliers and customers to participate in product development? The research is carried out as an in-depth qualitative single case study in a large project manufacturing company. It takes the perspective of a focal company striving for product improvements. The first part of the empirical study consists of 15 semi-structured interviews. The second part includes two discursive workshops and builds upon the results of the interviews. This study contributes to the existing research by explaining the challenges and conditions facilitating joint product development with supplier and purchaser companies. The results highlight the role of customers in improving the effectiveness of product development. As a practical contribution, the paper reports the application of workshop method as a facilitator of collaboration between supplier, purchaser (focal company and customer companies.

  20. The Woodworker's Website: A Project Management Case Study

    Science.gov (United States)

    Jance, Marsha

    2014-01-01

    A case study that focuses on building a website for a woodworking business is discussed. Project management and linear programming techniques can be used to determine the time required to complete the website project discussed in the case. This case can be assigned to students in an undergraduate or graduate decision modeling or management science…

  1. Hierarchy Software Development Framework (h-dp-fwk) project

    International Nuclear Information System (INIS)

    Zaytsev, A

    2010-01-01

    Hierarchy Software Development Framework provides a lightweight tool for building portable modular applications for performing automated data analysis tasks in a batch mode. The history of design and development activities devoted to the project has begun in March 2005 and from the very beginning it was targeting the case of building experimental data processing applications for the CMD-3 experiment which is being commissioned at Budker Institute of Nuclear Physics (BINP, Novosibirsk, Russia). Its design addresses the generic case of modular data processing application operating within the well defined distributed computing environment. The main features of the framework are modularity, built-in message and data exchange mechanisms, XInclude and XML schema enabled XML configuration management tools, dedicated log management tools, internal debugging tools, both dynamic and static module chains support, internal DSO version and consistency checking, well defined API for developing specialized frameworks. It is supported on Scientific Linux 4 and 5 and planned to be ported to other platforms as well. The project is provided with the comprehensive set of technical documentation and users' guides. The licensing schema for the source code, binaries and documentation implies that the product is free for non-commercial use. Although the development phase is not over and many features are to be implemented yet the project is considered ready for public use and creating applications in various fields including development of events reconstruction software for small and moderate scale HEP experiments.

  2. Hierarchy Software Development Framework (h-dp-fwk) project

    Energy Technology Data Exchange (ETDEWEB)

    Zaytsev, A, E-mail: Alexander.S.Zaytsev@gmail.co [Budker Institute of Nuclear Physics, Novosibirsk (Russian Federation)

    2010-04-01

    Hierarchy Software Development Framework provides a lightweight tool for building portable modular applications for performing automated data analysis tasks in a batch mode. The history of design and development activities devoted to the project has begun in March 2005 and from the very beginning it was targeting the case of building experimental data processing applications for the CMD-3 experiment which is being commissioned at Budker Institute of Nuclear Physics (BINP, Novosibirsk, Russia). Its design addresses the generic case of modular data processing application operating within the well defined distributed computing environment. The main features of the framework are modularity, built-in message and data exchange mechanisms, XInclude and XML schema enabled XML configuration management tools, dedicated log management tools, internal debugging tools, both dynamic and static module chains support, internal DSO version and consistency checking, well defined API for developing specialized frameworks. It is supported on Scientific Linux 4 and 5 and planned to be ported to other platforms as well. The project is provided with the comprehensive set of technical documentation and users' guides. The licensing schema for the source code, binaries and documentation implies that the product is free for non-commercial use. Although the development phase is not over and many features are to be implemented yet the project is considered ready for public use and creating applications in various fields including development of events reconstruction software for small and moderate scale HEP experiments.

  3. Development of coupled models and their validation against experiments -DECOVALEX project

    International Nuclear Information System (INIS)

    Stephansson, O.; Jing, L.; Kautsky, F.

    1995-01-01

    DECOVALEX is an international co-operative research project for theoretical and experimental studies of coupled thermal, hydrological and mechanical processes in hard rocks. Different mathematical models and computer codes have been developed by research teams from different countries. These models and codes are used to study the so-called Bench Mark Test and Test Case problems developed within this project. Bench-Mark Tests are defined as hypothetical initial-boundary value problems of a generic nature, and Test Cases are experimental investigations of part or full aspects of coupled thermo-hydro-mechanical processes in hard rocks. Analytical and semi-analytical solutions related to coupled T-H-M processes are also developed for problems with simpler geometry and initial-boundary conditions. These solutions are developed to verify algorithms and their computer implementations. In this contribution the motivation, organization and approaches and current status of the project are presented, together with definitions of Bench-Mark Tests and Test Case problems. The definition and part of results for a BMT problem (BMT3) for a near-field repository model are described as an example. (authors). 3 refs., 11 figs., 3 tabs

  4. Pilot Project Technology Business Case: Mobile Work Packages

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lawrie, Sean [ScottMadden, Inc., Raleigh, NC (United States); Niedermuller, Josef [ScottMadden, Inc., Raleigh, NC (United States)

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  5. PROJECT-DRIVEN SOFTWARE BUSINESS IN TRANSILVANIA - A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Radu Marius

    2015-07-01

    Full Text Available The fairly low salaries of the IT workers compared to the Western countries, the skills and the location have supported outsourcing become one of the most competitive Romanian sectors. IT sector in Romania maintains a steady growth favoured by outsourcing companies. Moreover Romania is highly competitive when you take into account the level of technical proficiency and soft skills in the country. Romanian labour force can drive relevant projects even in small teams. This case study explores the realty of Romanian IT companies profiles. It presents in comparison two companies bases on organizational and strategic dimensions: project approach orientation, leadership, project value driven, and social responsibility. The corporate goal of the first company presented in the case study - Fortech - is to achieve the best adaptive organizational structure which can sustain its competitive advantage. This advantage results from combination of three main ingredients: scaled up human resource capital, versatile knowledge management and adaptability to customer needs. Fortech manages and administrates and execute their business activities using project management methodologies and practices in order to achieve the strategic goals. On the other hand Dolphin Kiss Company is a “Python boutique agency” created around a single contract and organized on a single project. The project was contracted with a top company from telecommunication industry. The company is a small team of creative software engineers focused on developing a very innovative software business solution. This case study is an empirical qualitative research intended to depict the main differences between two relevant company profiles present in the actual economic context: small team – results oriented – highly skilled VS large structure of outsourcing teams – matrix organized – customer oriented. The case study constructs a space for debates regarding the potential evolution of the

  6. Shuttle Transportation System Case-Study Development

    Science.gov (United States)

    Ransom, Khadijah

    2012-01-01

    A case-study collection was developed for NASA's Space Shuttle Program. Using lessons learned and documented by NASA KSC engineers, analysts, and contractors, decades of information related to processing and launching the Space Shuttle was gathered into a single database. The goal was to provide educators with an alternative means to teach real-world engineering processes and to enhance critical thinking, decision making, and problem solving skills. Suggested formats were created to assist both external educators and internal NASA employees to develop and contribute their own case-study reports to share with other educators and students. Via group project, class discussion, or open-ended research format, students will be introduced to the unique decision making process related to Shuttle missions and development. Teaching notes, images, and related documents will be made accessible to the public for presentation of Space Shuttle reports. Lessons investigated included the engine cutoff (ECO) sensor anomaly which occurred during mission STS-114. Students will be presented with general mission infom1ation as well as an explanation of ECO sensors. The project will conclude with the design of a website that allows for distribution of information to the public as well as case-study report submissions from other educators online.

  7. Stakeholder preferences towards the sustainable development of CDM projects: Lessons from biomass (rice husk) CDM project in Thailand

    International Nuclear Information System (INIS)

    Parnphumeesup, Piya; Kerr, Sandy A.

    2011-01-01

    This research applies both quantitative and qualitative methods to investigate stakeholder preferences towards sustainable development (SD) priorities in Clean Development Mechanism (CDM) projects. The CDM's contribution to SD is explored in the context of a biomass (rice husk) case study conducted in Thailand. Quantitative analysis ranks increasing the usage of renewable energy as the highest priority, followed by employment and technology transfer. Air pollution (dust) is ranked as the most important problem. Preference weights expressed by experts and local resident are statistically different in the cases of: employment generation; emission reductions; dust; waste disposal; and noise. Qualitative results, suggest that rice husk CDM projects contribute significantly to SD in terms of employment generation, an increase in usage of renewable energy, and transfer of knowledge. However, rice husk biomass projects create a potential negative impact on air quality. In order to ensure the environmental sustainability of CDM projects, stakeholders suggest that Thailand should cancel an Environmental Impact Assessment (EIA) exemption for CDM projects with an installed capacity below 10 MW and apply it to all CDM projects. - Highlights: → Stakeholders rank increasing the usage of renewable energy as the highest priority. → Biomass (rice husk) CDM projects create a potential negative impact on air quality. → Rice husk CDM projects cannot give an extra income to farmers. → Preference weights expressed by experts and local residents are statistically different.

  8. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  9. Case for real-time systems development - Quo vadis?

    Science.gov (United States)

    Erb, Dona M.

    1991-01-01

    The paper focuses on the distinctive issues of computer-aided software engineering (CASE) products for the development of real-time systems. CASE technologies and associated standardization efforts are evolving from sets of conflicting interests. The majority of case products are intended for use in the development of management information systems. CASE products to support the development of large, complex real-time systems must provide additional capabilities. Generic concerns include the quality of the implementation of the required method for the phase of the system's development and whether the vendor is stable and committed to evolving the products in parallel with nonproprietary standards. The CASE market is undergoing considerable consolidation. The paper describes the major forces, cooperating entities, and remaining uncertainties that need to be weighed in near-term CASE procurements to limit risk of loss of investment in project time, trianing, and money.

  10. A Coordinated Decentralized Approach to Online Project Development

    Science.gov (United States)

    Mykota, David

    2013-01-01

    With the growth rate of online learning outpacing traditional face-to-face instruction, universities are beginning to recognize the importance of strategic planning in its development. Making the case for online learning requires sound project management practices and an understanding of the business models on which it is predicated. The objective…

  11. A Database Design and Development Case: NanoTEK Networks

    Science.gov (United States)

    Ballenger, Robert M.

    2010-01-01

    This case provides a real-world project-oriented case study for students enrolled in a management information systems, database management, or systems analysis and design course in which database design and development are taught. The case consists of a business scenario to provide background information and details of the unique operating…

  12. Understanding lean & safety projects: analysis of case studies

    Directory of Open Access Journals (Sweden)

    Maria Crema

    2017-12-01

    Full Text Available Facing the current socio-economic contingency while guaranteeing a high level of care quality is particularly challenging in the field of healthcare. Through an integrated adoption of emerging managerial solutions, projects that allow organizations to achieve both efficiency and patient safety improvements could be implemented, thereby transposing policy directives towards a safer and more sustainable healthcare system. Therefore, the purpose of this paper is to investigate the features of Lean & Safety (L&S projects. Three Health Lean Management (HLM projects that had unexpected patient safety results were selected from the same region. Differences and similarities among the cases have been highlighted and interesting points of evidence have been noted. Despite the fact that the projects were pursuing similar objectives and benefiting from comparable support, the obtained changes had direct impact on patient safety enhancement in the cases that involved the front-office processes, and an indirect impact on patient safely for the L&S project that focused on back-office activities. The implementation processes and the Information and Communication Technologies (ICT adoption of the cases are also different.

  13. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  14. All projects related to | Page 540 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Topic: ECONOMIC IMPLICATIONS, INTERNATIONAL TRADE, SOCIAL IMPLICATIONS, Economic and social development. Region: North of Sahara, South of Sahara, India. Program: Employment and Growth. Total Funding: CA$ 1,003,000.00. Impact of China on sub-Saharan Africa : Country Case Studies. Project. China is ...

  15. Management of Globally Distributed Software Development Projects in Multiple-Vendor Constellations

    Science.gov (United States)

    Schott, Katharina; Beck, Roman; Gregory, Robert Wayne

    Global information systems development outsourcing is an apparent trend that is expected to continue in the foreseeable future. Thereby, IS-related services are not only increasingly provided from different geographical sites simultaneously but beyond that from multiple service providers based in different countries. The purpose of this paper is to understand how the involvement of multiple service providers affects the management of the globally distributed information systems development projects. As research on this topic is scarce, we applied an exploratory in-depth single-case study design as research approach. The case we analyzed comprises a global software development outsourcing project initiated by a German bank together with several globally distributed vendors. For data collection and data analysis we have adopted techniques suggested by the grounded theory method. Whereas the extant literature points out the increased management overhead associated with multi-sourcing, the analysis of our case suggests that the required effort for managing global outsourcing projects with multiple vendors depends among other things on the maturation level of the cooperation within the vendor portfolio. Furthermore, our data indicate that this interplay maturity is positively impacted through knowledge about the client that has been derived based on already existing client-vendor relationships. The paper concludes by offering theoretical and practical implications.

  16. Object Oriented Software Development Using A Use-Cases Approach

    African Journals Online (AJOL)

    Object Oriented Software Development Using A Use-Cases Approach. ... to the analysis and design of an online banking system using the Use-Cases method of Jacobson. ... thus bringing the benefits of object orientation into important software projects. Journal of Applied Sciences and Environmental Management Vol.

  17. A Case Study of Horizontal Reuse in a Project-Driven Organisation

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak; Røn, Henrik

    2000-01-01

    This experience paper presents observations, lessons learned, and recommendations based on a case study of reuse. The case study is concerned with the development, maturation, and reuse of a business domain independent software component (horizontal reuse) in a project-driven organisation that has...... knowledge is transferred within an organisation; (c) design patterns can be as risky as they can be beneficial; and (d) there is more to architectural mismatch than “merely ” packaging mismatch....

  18. ANALYSIS OF PROJECT PORTFOLIO MANAGEMENT MATURITY: THE CASE OF A SMALL FINANCIAL INSTITUTION

    Directory of Open Access Journals (Sweden)

    Karoline Doro Alves Carneiro

    2012-04-01

    Full Text Available This study explores the implementation of project portfolio management in the organizational context. The objective is to analyze the methodology of project portfolio management adopted by an organization based in the project portfolio management maturity model proposed by Rad and Levin (2006. We developed an exploratory case study in a small financial institution that experienced problems with the implementation of its methodology in project portfolio management. As a result of study, we found that the organization has maturity level 2 in portfolio project management, and that some methodology aspects are not appropriate at this level.

  19. Best Practice No 177: Best practice guideline: writing a business case for service development in pathology.

    Science.gov (United States)

    Galloway, M J

    2004-04-01

    This guideline reviews the introduction and development of business planning in the National Health Service. A guideline for writing a business case for service development that would form part of a pathology business plan has been developed. This guideline outlines six steps that are required in the preparation of a business case. The format of the guideline has been developed largely from other national guidelines that have been published for the development of capital projects. In view of the publication of these guidelines, the scope of this guideline excludes business cases for information, management, and technology projects and large capital projects.

  20. 16 case studies on the deployment of photovoltaic technologies in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-15

    This report for the International Energy Agency (IEA) made by Task 9 of the Photovoltaic Power Systems (PVPS) programme presents 16 Case Studies on the deployment of photovoltaic technologies in developing countries. This guide provides information for all decision-makers in developing countries involved in the process of developing a PV project. These decision-makers can be found in institutions and host governments and also include PV project developers and sponsors, PV producers and suppliers, entrepreneurs, and NGOs. The case studies presented can help such decision-makers learn from past experience gained in the deployment of PV systems. They include experience gained in PV-related projects in various countries, including electrification, water desalination and solar home systems. Financing issues are, of course, also addressed.

  1. The role of Project Finance in the viability of infrastructure projects: case of the petroleum and natural gas sector

    International Nuclear Information System (INIS)

    Faria, Viviana Cardoso de Sa e; Rodrigues, Adriano Pires

    2000-01-01

    Project finance represents neither recent news nor a panacea in the fields of long term financing. It is not able to solve the chronicle scarcity of resources applied in big projects financing in developing countries. In fact, underdeveloped markets as the Brazilian one offer, at the beginning, almost no chances to the project finance solution. In this case a path full of barriers overcome the solutions that project finance may offer. The process to adapt this instrument to the Brazilian reality presents the following hindrances: a different law framework, capital market underdevelopment; economical instability; political and regulating risks; incapability of the national insurance companies to insure big projects; cultural differences and lack of know-how in this area, and lastly, the out of date tax system. (author)

  2. Financing Options and Development Projects in the Nigerian Local ...

    African Journals Online (AJOL)

    This study is an investigation into the impact of Nigerian local government financing options on successful execution of development projects. Through the ordinary least square regression analysis, the study proved that though there is an established case of underfunding in the entire Nigerian local government system, the ...

  3. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    Energy Technology Data Exchange (ETDEWEB)

    Agol, Dorice, E-mail: d.agol@uea.a.c.uk [University of East Anglia, School of International Development, Norwich NR4 7TJ (United Kingdom); Latawiec, Agnieszka E., E-mail: a.latawiec@iis-rio.org [International Institute for Sustainability, Estrada Dona Castorina 124, 22460-320 Rio de Janeiro (Brazil); Opole University of Technology, Department of Production Engineering and Logistics, Luboszycka 5, 45-036 Opole (Poland); University of East Anglia, School of Environmental Sciences, Norwich NR4 7TJ (United Kingdom); Strassburg, Bernardo B.N., E-mail: b.strassburg@iis-rio.org [International Institute for Sustainability, Estrada Dona Castorina 124, 22460-320 Rio de Janeiro (Brazil); Department of Geography and the Environment, Pontificia Universidade Catolica, 22453-900 Rio de Janeiro (Brazil)

    2014-09-15

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  4. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    International Nuclear Information System (INIS)

    Agol, Dorice; Latawiec, Agnieszka E.; Strassburg, Bernardo B.N.

    2014-01-01

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  5. Operations Strategy Development in Project-based Production – a building contractor implements Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Friis, Ole Uhrskov

    2015-01-01

    Purpose: To study how operations strategy innovation occurs in project-based production and organisation. Design/methodology/approach: A longitudinal case study encompassing the processes at the company headquarters and in two projects using Lean. Findings: The operations strategy development com...

  6. Forest conservation and the clean development mechanism. Lessons from the Costa Rican protected areas project

    International Nuclear Information System (INIS)

    Voehringer, F.

    2004-01-01

    Deforestation is currently the source of about 20% of anthropogenic CO2 emissions. Avoided deforestation has, nonetheless, been ruled out as a Clean Development Mechanism (CDM) category in the Kyoto Protocol's first commitment period, because several methodological issues were considered too difficult to resolve. This paper explores whether CDM issues such as (1) carbon quantification, (2) additionality and baseline setting, (3) leakage risks, (4) non-permanence risks, and (5) sustainable development can be adequately dealt with in large, diversified forest conservation projects. To this aim, it studies the case of the Costa Rican Protected Areas Project (PAP), an Activities Implemented Jointly (AIJ) project which was meant to consolidate the national park system to avoid deforestation, promote the growth of secondary forests and regenerate pastures on an area that, in total, covers 10% of the national territory. The case study examines how the issues mentioned above have been addressed in the project design and in the certification process. It is found that baseline uncertainties are the major problem in this case. Nonetheless, the case suggests the possibility to address CDM issues by specific requirements for project design and very conservative and temporary crediting. Provided that other case studies support this conclusion, eligibility of well-designed forest conservation projects under the CDM in the second commitment period may be worth considering, given the secondary benefits of avoided deforestation

  7. Decision making and risk analysis during the development of wind energy projects

    International Nuclear Information System (INIS)

    Vanhaesebroeck, M.

    2004-11-01

    This study aims at determining a methodology or criteria which can be used as decision making tools for the development of wind power projects and for the objective profitability comparison between several projects. In the first part, the different steps of the development of a wind power project in France are described. For each step, the cost of the studies, the related approaches and the main risks of abandonment are precised. The potential time drifts in the planning of the project are identified on the basis of the experience feedback of the first years of wind power development in France. In the second part, the possibilities of using classical investment choice techniques are analyzed. The characteristics having more impact on the project profitability are identified. In the third part, the sequential models with increasing information are used to evaluate a project, whatever its level of development. Finally, a concrete case is considered to see how these models can be used as decision making tools during key steps of wind farms development. (J.S.)

  8. Guidance and Control Software Project Data - Volume 2: Development Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  9. Ranking of Sustainability Indicators for Assessment of the New Housing Development Projects: Case of the Baltic States

    Directory of Open Access Journals (Sweden)

    Laura Tupenaite

    2017-10-01

    Full Text Available Sustainable development is inconceivable without healthy real estate market. A housing project can be regarded as sustainable only when all the dimensions of sustainability (environmental, economic, and social are dealt with. There has been an increased interest in using sustainability indicators for evaluating the impacts of the new development projects. Although international literature is rich in sustainability assessments, there are no tools developed for assessment of new residential projects in the specific context of the Baltic States. Therefore, the aim of this article is to fill this gap and to propose an integrated, hierarchically structured system of sustainability indicators to be used for assessment of the new housing development projects. This aim is achieved through accomplishing three objectives. First, based on a review of literature related to assessing building project performance and sustainable development in construction, the paper proposes an original hierarchically structured system of sustainability indicators suitable for the Baltic context. Second, based on a survey of experts, significances of criteria are estimated by the Analytic Hierarchy Process (AHP method. Finally, paper proposes recommendations to government authorities and real estate developers as to how to enhance the performance of new residential projects according to the principles of sustainability.

  10. Managing the Business Case Development in Inter-organizational IT Projects: A Methodology and its Application

    NARCIS (Netherlands)

    Eckartz, S.M.

    2012-01-01

    The business case (BC) is an artifact that is used to justify an investment in terms of its expected costs, benefits and risks. In the field of IT it is commonly used to justify an investment into an IT project in order to get the investment approval from upper management. Decision makers also may

  11. Energy Efficiency Project Development

    Energy Technology Data Exchange (ETDEWEB)

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1

  12. Development and implementation of a 600-MW natural gas cogeneration project - a financial case history

    International Nuclear Information System (INIS)

    Quinn, N.K.; Sherrill, R.L.

    1992-01-01

    In February 1990, General Electric Capital Corporation (GECC), through its wholly owned subsidiary, General Electric Power Funding Corporation (GEPFC), provided a number of commitments to a partnership (the Partnership) formed by a company that develops, owns, and operates cogeneration facilities to fund the development, construction, and permanent debt and equity financing of a 614 megawatt (M) cogeneration facility (the Project) to be located near a large refinery in the northeastern United States. The Project is unusual both for the magnitude of its natural gas requirements and for its contractual configuration. The Project's entire transportation needs and a substantial portion of its gas requirements will be met by a joint venture between two local gas distribution companies (the Joint Venture), one of which is a large gas-consuming utility in the eastern United States. The Project's power purchase customer, (the Utility Host), is another very large gas-consuming utility. Thus, the fuel cost recovery of the Project is determined by the Utility Host's gas costs while its actual bill for fuel will be heavily influenced by the Joint Venture's gas commodity and transportation costs. Therefore, in appraising the credit quality of the Project's proposed fuel supply arrangements, the key issue to be answered is: Are the Project's natural gas supply and transportation arrangements compatible with the fuel cost recovery provisions of the power sales agreement with the Utility Host? If so, then the sensitivity of the Project's financing to adverse gas price movements would be minimized

  13. The role intuitive decision making plays in project selection in the residential property market: a case study of a medium sized

    OpenAIRE

    Ryan, Diarmuid

    2013-01-01

    non-peer-reviewed This thesis addresses the role of intuition in project selection in residential property development. The paper provides a comprehensive review of existing literature in relation to project selection and decision making. In addition, the examination of the project files of M.A. Ryan & Sons Ltd., a medium sized property development company, has enabled a case study to be carried out on three projects carried out by the organisation. Through the case study, t...

  14. The CASE Project: Evaluation of Case-Based Approaches to Learning and Teaching in Statistics Service Courses

    Science.gov (United States)

    Fawcett, Lee

    2017-01-01

    The CASE project (Case-based Approaches to Statistics Education; see www.mas.ncl.ac.uk/~nlf8/innovation) was established to investigate how the use of real-life, discipline-specific case study material in Statistics service courses could improve student engagement, motivation, and confidence. Ultimately, the project aims to promote deep learning…

  15. Program Evaluation - Automotive Lightweighting Materials Program Research and Development Projects Assessment of Benefits - Case Studies No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Das, S.

    2003-01-23

    This report is the second of a series of studies to evaluate research and development (R&D) projects funded by the Automotive Lightweighting Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). The objectives of the program evaluation are to assess short-run outputs and long-run outcomes that may be attributable to the ALM R&D projects. The ALM program focuses on the development and validation of advanced technologies that significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. Funded projects range from fundamental materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R&D projects were chosen for this evaluation: Design and Product Optimization for Cast Light Metals, Durability of Lightweight Composite Structures, and Rapid Tooling for Functional Prototyping of Metal Mold Processes. These projects were chosen because they have already been completed. The first project resulted in development of a comprehensive cast light metal property database, an automotive application design guide, computerized predictive models, process monitoring sensors, and quality assurance methods. The second project, the durability of lightweight composite structures, produced durability-based design criteria documents, predictive models for creep deformation, and minimum test requirements and suggested test methods for establishing durability properties and characteristics of random glass-fiber composites for automotive structural composites. The durability project supported Focal Project II, a validation activity that demonstrates ALM program goals and reduces the lead time for bringing new technology into the marketplace. Focal

  16. Business Value Is not only Dollars : Results from Case Study Research on Agile Software Projects

    NARCIS (Netherlands)

    Racheva, Z.; Daneva, Maia; Sikkel, Nicolaas; Buglione, Luigi; Ali Babar, M.; Vierimaa, Matias; Oivo, Markku

    Business value is a key concept in agile software development. This paper presents results of a case study on how business value and its creation is perceived in the context of agile projects. Our overall conclusion is that the project participants almost never use an explicit and structured

  17. REFERENCE CASES FOR USE IN THE CEMENTITOUS PARTNERSHIP PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Langton, C.; Kosson, D.; Garrabrants, A.

    2010-08-31

    The Cementitious Barriers Partnership Project (CBP) is a multi-disciplinary, multi-institution cross cutting collaborative effort supported by the US Department of Energy (DOE) to develop a reasonable and credible set of tools to improve understanding and prediction of the structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. The period of performance is >100 years for operating facilities and > 1000 years for waste management. The CBP has defined a set of reference cases to provide the following functions: (i) a common set of system configurations to illustrate the methods and tools developed by the CBP, (ii) a common basis for evaluating methodology for uncertainty characterization, (iii) a common set of cases to develop a complete set of parameter and changes in parameters as a function of time and changing conditions, (iv) a basis for experiments and model validation, and (v) a basis for improving conceptual models and reducing model uncertainties. These reference cases include the following two reference disposal units and a reference storage unit: (i) a cementitious low activity waste form in a reinforced concrete disposal vault, (ii) a concrete vault containing a steel high-level waste tank filled with grout (closed high-level waste tank), and (iii) a spent nuclear fuel basin during operation. Each case provides a different set of desired performance characteristics and interfaces between materials and with the environment. Examples of concretes, grout fills and a cementitious waste form are identified for the relevant reference case configurations.

  18. REFERENCE CASES FOR USE IN THE CEMENTITOUS PARTNERSHIP PROJECT

    International Nuclear Information System (INIS)

    Langton, C.; Kosson, D.; Garrabrants, A.

    2010-01-01

    The Cementitious Barriers Partnership Project (CBP) is a multi-disciplinary, multi-institution cross cutting collaborative effort supported by the US Department of Energy (DOE) to develop a reasonable and credible set of tools to improve understanding and prediction of the structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. The period of performance is >100 years for operating facilities and > 1000 years for waste management. The CBP has defined a set of reference cases to provide the following functions: (i) a common set of system configurations to illustrate the methods and tools developed by the CBP, (ii) a common basis for evaluating methodology for uncertainty characterization, (iii) a common set of cases to develop a complete set of parameter and changes in parameters as a function of time and changing conditions, (iv) a basis for experiments and model validation, and (v) a basis for improving conceptual models and reducing model uncertainties. These reference cases include the following two reference disposal units and a reference storage unit: (i) a cementitious low activity waste form in a reinforced concrete disposal vault, (ii) a concrete vault containing a steel high-level waste tank filled with grout (closed high-level waste tank), and (iii) a spent nuclear fuel basin during operation. Each case provides a different set of desired performance characteristics and interfaces between materials and with the environment. Examples of concretes, grout fills and a cementitious waste form are identified for the relevant reference case configurations.

  19. Opportunities and criticisms of voluntary emission reduction projects developed by Public Administrations: Analysis of 143 case studies implemented in Italy

    International Nuclear Information System (INIS)

    Gallo, Michela; Del Borghi, Adriana; Strazza, Carlo; Parodi, Lara; Arcioni, Livia; Proietti, Stefania

    2016-01-01

    Highlights: • 143 voluntary emission reduction projects have been analysed. • The projects belong to renewable energy, energy efficiency and transport sectors. • Voluntary emission reduction standards and methodologies have been applied. • The paper identified the main criticisms for each sector. • Energy efficiency projects are the most promising for public entities. - Abstract: The United Nations Framework Convention on Climate Change (UNFCCC) sets an overall framework for intergovernmental efforts to tackle the challenge posed by climate change. Besides the “flexibility mechanisms” defined by the Kyoto Protocol to lower the overall costs of achieving their emissions targets, The Voluntary Green House Gases (GHG) reduction projects can have a lead role in GHG reduction in “non Emissions Trading System ETS sectors”. Nowadays, the voluntary market is characterised by critical aspects, such as fragmentation, lack of accounting, monitoring and validation rules that have led to the low spread of voluntary emission reduction projects developed by local authorities in the European Union despite their high potentiality. The aim of this paper is to test the applicability of voluntary emission reduction projects in the public sector following a homogeneous and consistent pattern. A research has been performed at local level on 143 voluntary emission reduction projects implemented by Public Administrations in Northern and Central Italy in renewable energy, energy efficiency and transport sectors. The applicable standards and methodologies have been checked and the case studies have been analysed though a three-step process: Preliminary additionality assessment; Projects selection; Validation of the selected project. The assessment shows that energy efficiency projects, once overcoming additionality issues, are the most promising for public entities while renewable energy and transport projects resulted to be mainly affected by double counting problems and

  20. Case Writing Projects in Co-Operation with Companies and Organizations

    OpenAIRE

    Bengtsson, Lars; Asplund, Carl-Johan

    2008-01-01

    The purpose of this paper is to present the process and evaluation of case writing projects in co-operation with companies and organizations in a course for engineering students. The case writing projects could provide an illustration and example framework for working with companies in constructing cases. Normally cases are constructed for teaching purposes in higher education. However, in order to get closer co-operation and more interest from the companies the authors encouraged the student...

  1. Oluvil Port Development Project

    DEFF Research Database (Denmark)

    Frigaard, Peter; Margheritini, Lucia

    Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during...... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...

  2. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  3. Assessment of small versus large hydro-power developments - a Norwegian case study

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Tor Haakon; Harby, Atle

    2010-07-01

    Full text: The era of new, large hydro-power development projects seems to be over in Norway. Partly as a response to this, a large number of applications for the development of smallscale hydro power projects up to 10 MW overflow the Water Resources and Energy Directorate, resulting in an extensive development of small tributaries and water courses in Norway. This study has developed a framework for the assessment and comparison of several small versus many large hydro-power projects based on a multi-criteria analysis (MCA) approach, and further tested this approach on planned or developed projects in the Helgeland region, Norway. Multi-criteria analysis is a decision-support tool aimed at providing a systematic approach for the comparison of various alternatives with often non-commensurable and conflicting attributes. At the same time, the technique enables complex problems and various alternatives to be assessed in a transparent and simple way. The MCA-software was in our case equipped with 2 overall criteria (objectives) with a number of sub criteria; Production with sub-criteria like volume of energy production, installed effect, storage capacity and economical profit; Environmental impacts with sub-criteria like fishing interests, biodiversity, protection of unexploited nature The data used in the case study is based on the planned development of Vefsna (large project) with the energy/effect production estimated and the environmental impacts identified as part of the feasibility studies (the project never reached the authorities' licensing system with a formal EIA). The small-scale hydro-power projects used for comparison are based on realized projects in the Helgeland region and a number of proposed projects, up scaled to the size of the proposed Vefsna-development. The results from the study indicate that a large number of small-scale hydro-power projects need to be implemented in order to balance the volume of produced electricity/effect from one

  4. The role of quality management in safety case development - Nagra's experience

    International Nuclear Information System (INIS)

    Schneider, Juerg W.; Zuidema, Piet

    2014-01-01

    This paper discusses the role of quality management (QM) in safety case development based on Nagra's experience from a broad range of projects. These include Project Gewahr (L/ILW and HLW, Nagra, 1985), the Wellenberg Project (L/ILW, Nagra, 1994), Project Opalinus Clay (HLW, Nagra, 2002a, 2002b), and recent project work needed in the context of the Swiss site selection process (L/ILW and HLW, Nagra, 2008a, 2008b, 2008c, 2010). Broadly speaking, Nagra's Quality Management policy is focused on ensuring: i) the quality of the disposal system (siting, design and implementation); ii) the quality of the underlying scientific understanding, which are seen as key elements of a credible safety case, along with the quality of the safety calculations themselves and of compiling the safety case, including the drawing of conclusions (Nagra, 2002a). All aspects of QM discussed in this paper should be seen in this context. (authors)

  5. Barriers to clean development mechanism renewable energy projects in Mexico

    International Nuclear Information System (INIS)

    Lokey, Elizabeth

    2009-01-01

    Mexico is not reaching its full potential to capture benefits from clean development mechanism (CDM) projects because of its limited market for independent power producers (IPPs) and the barriers imposed on these entities by the state-run electric utility that controls most of the country's generation and transmission. This state-run entity has pursued CDM revenues only in isolated cases where international financial assistance was given because it is bound by law to pursue the least-cost generation option for its customers. Recent changes in Mexican legislation that provide incentives for renewable energy development could open the marketplace for these types of projects. (author)

  6. Is a Clean Development Mechanism project economically justified? Case study of an International Carbon Sequestration Project in Iran.

    Science.gov (United States)

    Katircioglu, Salih; Dalir, Sara; Olya, Hossein G

    2016-01-01

    The present study evaluates a carbon sequestration project for the three plant species in arid and semiarid regions of Iran. Results show that Haloxylon performed appropriately in the carbon sequestration process during the 6 years of the International Carbon Sequestration Project (ICSP). In addition to a high degree of carbon dioxide sequestration, Haloxylon shows high compatibility with severe environmental conditions and low maintenance costs. Financial and economic analysis demonstrated that the ICSP was justified from an economic perspective. The financial assessment showed that net present value (NPV) (US$1,098,022.70), internal rate of return (IRR) (21.53%), and payback period (6 years) were in an acceptable range. The results of the economic analysis suggested an NPV of US$4,407,805.15 and an IRR of 50.63%. Therefore, results of this study suggest that there are sufficient incentives for investors to participate in such kind of Clean Development Mechanism (CDM) projects.

  7. Information System Development: Can Traditional Project Management Tools Be Successful in Post-Industrial Organizations?

    DEFF Research Database (Denmark)

    Carugati, Andrea

    2002-01-01

    Literature on project management of information systems development suggests practices based on success stories in industrial organizations. Recent trends towards post-industrial organizational forms and loosely coupled networked organizations raise questions regarding the applicability of these ...... of information systems development projects in post-industrial organizations. The guidelines are both the result of post-rationalization of the team members and of the case analysis....

  8. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  9. Project Management Methodology for the Development of M-Learning Web Based Applications

    Directory of Open Access Journals (Sweden)

    Adrian VISOIU

    2010-01-01

    Full Text Available M-learning web based applications are a particular case of web applications designed to be operated from mobile devices. Also, their purpose is to implement learning aspects. Project management of such applications takes into account the identified peculiarities. M-learning web based application characteristics are identified. M-learning functionality covers the needs of an educational process. Development is described taking into account the mobile web and its influences over the analysis, design, construction and testing phases. Activities building up a work breakdown structure for development of m-learning web based applications are presented. Project monitoring and control techniques are proposed. Resources required for projects are discussed.

  10. STS Case Study Development Support

    Science.gov (United States)

    Rosa de Jesus, Dan A.; Johnson, Grace K.

    2013-01-01

    The Shuttle Case Study Collection (SCSC) has been developed using lessons learned documented by NASA engineers, analysts, and contractors. The SCSC provides educators with a new tool to teach real-world engineering processes with the goal of providing unique educational materials that enhance critical thinking, decision-making and problem-solving skills. During this third phase of the project, responsibilities included: the revision of the Hyper Text Markup Language (HTML) source code to ensure all pages follow World Wide Web Consortium (W3C) standards, and the addition and edition of website content, including text, documents, and images. Basic HTML knowledge was required, as was basic knowledge of photo editing software, and training to learn how to use NASA's Content Management System for website design. The outcome of this project was its release to the public.

  11. An eCommerce Development Case: Your Company's eCommerce Web Site

    Science.gov (United States)

    Ballenger, Robert M.

    2007-01-01

    This case provides a real-world semester long project-oriented case study for students enrolled in an electronic commerce course that has a significant development component. The case provides the technical framework in the form of functional requirements for students to design and build a fully functional transaction processing e-commerce Web…

  12. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  13. Social and Environmental Responsibility and Local Sustainable Development: The Case of the Environmental Education Project and Asset – PEAP

    Directory of Open Access Journals (Sweden)

    Eugênia Rosa Cabral

    2015-04-01

    Full Text Available The study analyzes the actions of social responsibility expressed by the Environmental and Heritage Education Project (PEAP, which has been  implemented in the Boa Vista and Moura communities, both located in Oriximiná, State of Pará. This project purported to promote the rescue and preservation of environmental and cultural heritage in local communities, developed in a partnership between the Museu Paraense Emilio Goeldi (Emilio Goeldi [a painter] Pará Museum] (MPEG, the private company Mineração Rio do Norte (Rio do Norte Mining (MRN and representatives of local communities. This study examines to what extent the actions of PEAP can be considered drivers of sustainable local development. To answer this question, the research focused on the implementation of the PEAP actions and their effects on the two communities under study. Specifically, we sought to identify potential social, cultural and economic impacts of the actions of PEAP on both communities, and to identify future expectations of social subjects involved. This is a case study that follows a qualitative approach. The data collected in documents and interviews were analyzed according to the concepts of sustainable local development, corporate social responsibility and tri-sector partnership. The study identified that the actions taken by the PEAP result of management practices and participatory social planning, and reflecting the redemption of traditional practices, socialization of information and income generation, which together contribute to sustainable local development.

  14. Procuring complex performance:case: public infrastructure projects

    OpenAIRE

    Leppänen, T. (Tero)

    2015-01-01

    Abstract This research studies procuring complex performance (PCP) in the case of public infrastructure projects. Focus of the research is on the interface between public clients and private sector contractors. Purpose of this research is to find out what are the main challenges of different project delivery methods according to literature (RQ1) and what are the practical challenges of public procurement (RQ2). As an end re...

  15. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects

    International Nuclear Information System (INIS)

    Morimoto, Risako

    2013-01-01

    Before commissioning any energy projects, conducting robust assessments of different options in terms of their economic and socio-environmental impacts is important for successful project implementation. Yet, there is currently a lack of tools that simultaneously assess sustainability impacts; instead, they are often investigated separately, which gives decision makers somehow disintegrated information. Thus the main objective of this study is to examine how to incorporate socio-environmental considerations into project assessment models. The multi-criteria analysis is applied to the case study of Sri Lankan hydropower projects as an illustrative example. The estimated quantitative relationship between economic, environmental and social impacts of hydropower development is presented in this study. Such estimation, using sustainability indicators of hydropower projects, enables us to understand marginal trade-offs among economic, environmental and social objectives of hydropower development. Hence, this would provide an overview of potential impacts of different scenarios that are designed to be implemented and indicate an optimum mix of hydropower generation. - Highlights: • This study provides an effective hydropower project evaluation method using the MCA. • The proposed tool shows the quantitative relationship explicitly. • Marginal trade-offs between sustainability objectives are presented

  16. Cooperation and communication challenges in small-scale eHealth development projects.

    Science.gov (United States)

    Petersen, Lone Stub; Bertelsen, Pernille; Bjørnes, Charlotte

    2013-12-01

    In eHealth development there is an increasing focus on user participation inspired by the information systems field of practice and research. There are, however, many other challenges in developing information systems that fit healthcare practices. One of these is the challenge of cooperation and communication in development projects that are initiated and managed by clinicians e.g. cooperating with IT professionals in 'bottom up' health informatics projects that have been initiated and are managed by healthcare professional project managers. The analysis and results are drawn from a qualitative case study on a systems development project that was managed by a local, non-technical, healthcare professional and the complex blend and interactions with the IT professionals in the phases of ideas, design, development, implementation, maintenance and distribution. We analyze the challenges of cooperation and communication using perspectives from information systems research and the concepts of 'language-games' and 'shared design spaces', and thereby exploring the boundaries between the different communication, practice and culture of the IT professionals and the healthcare professionals. There is a need to (a) develop a better understanding of the development process from the point of view of the 'user' and (b) tools for making technical knowledge explicit in the development process. Cooperative and communicative methods are needed that support and develop the shared design spaces between IT professionals and the clinical context in order to strengthen small-scale health information systems projects. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  17. Knowledge Creation Through Development Projects

    DEFF Research Database (Denmark)

    Laursen, Erik

    2010-01-01

    The focus of the paper is set on efforts to produce and manage organizational learning and development through engagement in organizational development projects, involving the implementation of new methods, new technologies and new ways of organizing the work processes. The issues discussed...... study of four organizational development projects (covering the organizations as a whole) held by four Danish High Schools (“gymnasium”). The study included questionnaires as well as interviews with the management and staff, plus a survey of selected written materials and documents. The purpose...... of the paper is to describe the activities, actually organized by the projects., as well as the various ways in which different groupings among the staff and the management are relating to the project. A special focus is set on the different perspectives on the projects established by the staff...

  18. 23 CFR 660.112 - Project development.

    Science.gov (United States)

    2010-04-01

    ... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid procedures and procedures documented in the statewide agreement. (b) The FH projects shall be designed in...

  19. The Dynamics of Project-Based Learning Extension Courses: The "Laboratory of Social Projects" Case Study

    Science.gov (United States)

    Arantes do Amaral, Joao Alberto

    2017-01-01

    In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, "Laboratory of Social Projects." The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of…

  20. Current industrial practice of managing risks in product development project portfolios

    DEFF Research Database (Denmark)

    Weng, R.; Oehmen, Josef; Ben-Daya, M.

    2013-01-01

    Managing portfolios of development and engineering projects currently presents significant challenges to companies. This is even more the case in the management of portfolio risks, where both industry and academia currently lack a clear conceptual understanding of what portfolio risks are and what...

  1. Students' Research Experiences during Consulting Projects: Three Themes Emerging from Case Studies

    Science.gov (United States)

    Phillips, Carissa M. Holler

    2010-01-01

    Student consulting projects, an advanced form of problem-based learning, allow students to apply the skills developed in their classes on behalf of client organizations. A review of selected case studies in business education and other management education literature shows that research is an integral part of this consulting process. More than…

  2. Safety cases for radioactive waste disposal facilities: guidance on confidence building and regulatory review IAEA-ASAM co-ordinated research project

    International Nuclear Information System (INIS)

    Ben Belfadhel, M.; Bennett, D.G.; Metcalf, P.; Nys, V.; Goldammer, W.

    2008-01-01

    The IAEA has been conducting two co-ordinated research programmes (CRPs) projects to develop and apply improved safety assessment methodologies for near-surface radioactive waste disposal facilities. The more recent of these projects, ASAM (application of safety assessment methodologies), included a Regulatory Review Working Group (RRWG) which has been working to develop guidance on how to gain confidence in safety assessments and safety cases, and on how to conduct regulatory reviews of safety assessments. This paper provides an overview of the ASAM project, focusing on the safety case and regulatory review. (authors)

  3. Person-centred web-based support--development through a Swedish multi-case study.

    Science.gov (United States)

    Josefsson, Ulrika; Berg, Marie; Koinberg, Ingalill; Hellström, Anna-Lena; Nolbris, Margaretha Jenholt; Ranerup, Agneta; Lundin, Carina Sparud; Skärsäter, Ingela

    2013-10-19

    Departing from the widespread use of the internet in modern society and the emerging use of web applications in healthcare this project captures persons' needs and expectations in order to develop highly usable web recourses. The purpose of this paper is to outline a multi-case research project focused on the development and evaluation of person-centred web-based support for people with long-term illness. To support the underlying idea to move beyond the illness, we approach the development of web support from the perspective of the emergent area of person-centred care. The project aims to contribute to the ongoing development of web-based supports in health care and to the emerging field of person-centred care. The research design uses a meta-analytical approach through its focus on synthesizing experiences from four Swedish regional and national cases of design and use of web-based support in long-term illness. The cases include children (bladder dysfunction and urogenital malformation), young adults (living close to persons with mental illness), and two different cases of adults (women with breast cancer and childbearing women with type 1 diabetes). All of the cases are ongoing, though in different stages of design, implementation, and analysis. This, we argue, will lead to a synthesis of results on a meta-level not yet described. To allow valid comparisons between the four cases we explore and problematize them in relation to four main aspects: 1) The use of people's experiences and needs; 2) The role of use of theories in the design of person-centred web-based supports; 3) The evaluation of the effects of health outcomes for the informants involved and 4) The development of a generic person-centred model for learning and social support for people with long-term illness and their significant others. Person-centred web-based support is a new area and few studies focus on how web-based interventions can contribute to the development of person-centred care. In

  4. Gamification in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Platonova Valērija

    2017-12-01

    Full Text Available Gamification is one of the many ways to motivate employees and introduce more fun in daily activities. The aim of the paper is to analyse the impact of gamification method on the software development projects. The paper contains results of a literature review about application areas of gamification, methods, positive and negative effects on projects. The paper also presents an overview of the gamification tools used in software development projects and attempts to answer the question about benefits of gamification usage: whether gamification in the project leads to the desired results and increases the employee productivity and motivation.

  5. LYNX community advocacy & service engagement (CASE) project final report.

    Science.gov (United States)

    2009-05-14

    This report is a final assessment of the Community Advocacy & Service Engagement (CASE) project, a LYNX-FTA research project designed : to study transit education and public engagement methods in Central Florida. In the Orlando area, as in other part...

  6. Social impacts of community renewable energy projects: findings from a woodfuel case study

    International Nuclear Information System (INIS)

    Rogers, Jennifer C.; Simmons, Eunice A.; Convery, Ian; Weatherall, Andrew

    2012-01-01

    There is much current interest in the potential of community-based renewable energy projects to contribute to transition towards low carbon energy systems. As well as displacing fossil fuel consumption by increasing renewable energy generation, projects are expected to have a range of social impacts which may result in additional positive sustainability outcomes. These include potential to increase: acceptance of renewable energy developments; awareness of renewable and sustainable energy technologies and issues; uptake of low carbon technologies; and sustainable/pro-environmental behaviours. To date however, there has been little investigation of whether and how these impacts occur. This paper presents results from qualitative research investigating the social impacts of a community woodfuel project as experienced by project participants and other local stakeholders. Findings show projects can raise awareness of renewable energy technologies and increase uptake of renewables. Overall the case study project successfully changed the local social context for development of woodfuel heating, reducing risk for all involved in the future development of this sector, particularly in the immediate locality. There was some evidence of increased engagement with wider sustainability issues but this was limited to direct participants, suggesting local projects need to be supported by wider systemic change to maximise impacts. - Highlights: ► We assessed the social impacts of a community woodfuel project. ► The project increased awareness and uptake of woodfuel heating. ► Impacts were achieved as a result of the locally-specific approach. ► Local projects can seed cultural change promoting transition to a low carbon society.

  7. PLANNING QUALITY ASSURANCE PROCESSES IN A LARGE SCALE GEOGRAPHICALLY SPREAD HYBRID SOFTWARE DEVELOPMENT PROJECT

    Directory of Open Access Journals (Sweden)

    Святослав Аркадійович МУРАВЕЦЬКИЙ

    2016-02-01

    Full Text Available There have been discussed key points of operational activates in a large scale geographically spread software development projects. A look taken at required QA processes structure in such project. There have been given up to date methods of integration quality assurance processes into software development processes. There have been reviewed existing groups of software development methodologies. Such as sequential, agile and based on RPINCE2. There have been given a condensed overview of quality assurance processes in each group. There have been given a review of common challenges that sequential and agile models are having in case of large geographically spread hybrid software development project. Recommendations were given in order to tackle those challenges.  The conclusions about the best methodology choice and appliance to the particular project have been made.

  8. Developing Government Renewable Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  9. Estimating the greenhouse gas benefits of forestry projects: A Costa Rican Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Busch, Christopher; Sathaye, Jayant; Sanchez Azofeifa, G. Arturo

    2000-09-01

    If the Clean Development Mechanism proposed under the Kyoto Protocol is to serve as an effective means for combating global climate change, it will depend upon reliable estimates of greenhouse gas benefits. This paper sketches the theoretical basis for estimating the greenhouse gas benefits of forestry projects and suggests lessons learned based on a case study of Costa Rica's Protected Areas Project, which is a 500,000 hectare effort to reduce deforestation and enhance reforestation. The Protected Areas Project in many senses advances the state of the art for Clean Development Mechanism-type forestry projects, as does the third-party verification work of SGS International Certification Services on the project. Nonetheless, sensitivity analysis shows that carbon benefit estimates for the project vary widely based on the imputed deforestation rate in the baseline scenario, e.g. the deforestation rate expected if the project were not implemented. This, along with a newly available national dataset that confirms other research showing a slower rate of deforestation in Costa Rica, suggests that the use of the 1979--1992 forest cover data originally as the basis for estimating carbon savings should be reconsidered. When the newly available data is substituted, carbon savings amount to 8.9 Mt (million tones) of carbon, down from the original estimate of 15.7 Mt. The primary general conclusion is that project developers should give more attention to the forecasting land use and land cover change scenarios underlying estimates of greenhouse gas benefits.

  10. Systems engineering real estate development projects

    Science.gov (United States)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  11. Small and medium-sized hydropower projects in competitive markets: the case of Rio Piedras

    International Nuclear Information System (INIS)

    Restrepo Posada, Federico

    1999-01-01

    The article describes the case of the Rio Piedras Hydropower Project, a first private hydropower generation initiative in Colombia, within the new regulatory framework for the provision of public services and electric generation under laws 142 and 143, passed in 1994. Reference is made in this article to the background and characteristics of the Project, and some obstacles, challenges and risks encountered are described, as well as the way in which they are being controlled. The investment and commercialization modules developed in analyzing the project are also presented. Finally, some reflections are given as to the medium and long term prospects for electric generation projects in Colombia. (The author)

  12. Case study B. Architectural design management using a project web

    NARCIS (Netherlands)

    DeClerck, F.; Pels, H.J.; Otter, den A.F.H.J.; Emmitt, S.; Prins, M.; Otter, den A.F.

    2009-01-01

    In this chapter the use and organization of use of a project website is described in the design and realization of a construction project. The case concerns a complicated project with a high number of different parties involved, managed by an architectural office and having an internationally

  13. Framework for Small-Scale Experiments in Software Engineering: Guidance and Control Software Project: Software Engineering Case Study

    Science.gov (United States)

    Hayhurst, Kelly J.

    1998-01-01

    Software is becoming increasingly significant in today's critical avionics systems. To achieve safe, reliable software, government regulatory agencies such as the Federal Aviation Administration (FAA) and the Department of Defense mandate the use of certain software development methods. However, little scientific evidence exists to show a correlation between software development methods and product quality. Given this lack of evidence, a series of experiments has been conducted to understand why and how software fails. The Guidance and Control Software (GCS) project is the latest in this series. The GCS project is a case study of the Requirements and Technical Concepts for Aviation RTCA/DO-178B guidelines, Software Considerations in Airborne Systems and Equipment Certification. All civil transport airframe and equipment vendors are expected to comply with these guidelines in building systems to be certified by the FAA for use in commercial aircraft. For the case study, two implementations of a guidance and control application were developed to comply with the DO-178B guidelines for Level A (critical) software. The development included the requirements, design, coding, verification, configuration management, and quality assurance processes. This paper discusses the details of the GCS project and presents the results of the case study.

  14. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  15. Dream Team--The Case of an Undergraduate Surgical Talent Development Project

    Science.gov (United States)

    Jensen, Rune Dall; Ljungmann, Ken; Christensen, Mette Krogh; Møldrup, Ulla; Grøndal, Anne Krogh; Mogensen, Mads Filtenborg; Seyer-Hansen, Mikkel

    2016-01-01

    To be successful, a surgeon must master a variety of skills. To meet the high demand for surgical expertise, an extracurricular undergraduate project was launched. The extracurricular project consists of hands-on laparoscopic training and a mentorship programme. The project aims to find the best surgical talents among fourth-year medical students.…

  16. Developing sustainable models of interprofessional learning in practice--the TUILIP project.

    Science.gov (United States)

    Armitage, Helen; Connolly, Jim; Pitt, Richard

    2008-07-01

    This paper will describe the background and development of the Trent Universities Interprofessional Learning in Practice Project (TUILIP). It will review some of the contributing literature on recent policy initiatives for interprofessional learning (IPL) and in particular the literature that supports the case for IPL to be embedded in the practice learning environment. The impact of IPL on health outcomes is discussed and on team working in practice. The modernisation of the National Health Service in the UK is explained and how the East Midlands Strategic Health Authority has commissioned the TUILIP project that will promote and facilitate the interprofessional skills of students through collaborative working within the practice setting. The TUILIP project is described, in particular, staff development for practitioners, the centrality of service users and the innovative approach of IPL Facilitators in pilot sites across the Trent region.

  17. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    Science.gov (United States)

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  18. Adoption of ICT in Science Education: A Case Study of Communication Channels in a Teachers' Professional Development Project

    Science.gov (United States)

    Juuti, Kalle; Lavonen, Jari; Aksela, Maija; Meisalo, Veijo

    2009-01-01

    This paper analyses the use of various communication channels in science teachers' professional development project aiming to develop versatile uses for ICT (Information and Communication Technologies) in science teaching. A teacher network was created specifically for this project, and the researchers facilitated three forms of communication…

  19. The Role of Public-Private Partnerships in Local Infrastructure: the Case of Carbon Offset Projects

    International Nuclear Information System (INIS)

    Teichmann, Dorothee

    2011-01-01

    Investment in low carbon infrastructure is considered as an important component of the fight against climate change. The mechanisms of climate regulation (such as carbon offsets) transfer to project developers the risks associated with reducing emissions of greenhouse gas (GHG) emissions, i.e. operational and technological risk, or risks associated with the environmental monitoring and the regulatory mechanism itself. The success of projects - and thus their ability to attract private capital - depends importantly on the risk sharing arrangements between the private and public partners involved in the project. We show that the delegation of tasks between the partners can create risks that affect the environmental effectiveness and economic efficiency of the project. Contracts need to be well designed to mitigate those risks. For a sample of landfill gas flaring projects financed under the Clean Development Mechanism, it is shown that the out-sourcing of the provision of technology creates additional risks. The out-sourcing of the development of the Project Design Documents as required by UNFCCC and the separation of the operation of the landfill and the CDM project appear to be manageable by risk sharing arrangements between partners. In the latter case, each partner should bear the risk associated with his own responsibility. In fact, if carbon revenues are the only income stream for the CDM project developer, the incentive to reduce GHG emissions is maintained. (author)

  20. Incorporating regional growth into forecasts of greenhouse gas emissions from project-level residential and commercial development

    International Nuclear Information System (INIS)

    Rowangould, Dana; Eldridge, Melody; Niemeier, Deb

    2013-01-01

    To better understand the greenhouse gas (GHG) implications of land use planning decisions, regional planning organizations have developed tools to forecast the emissions from project-level residential and commercial development. This paper reviews the state of GHG emissions forecasting methods for project-level development. We argue that when forecasting changes in regional emissions it is important to make explicit what is assumed about a project′s effect on the population of residents and businesses in the region. We present five regional growth assumptions capturing the range of ways that project-level development might influence (i) construction and occupancy of similar developments elsewhere in a region and (ii) relocation of the initial activities that occur on-site before the project is built. We show that current forecasting tools inconsistently address the latter when they are interpreted as forecasted changes in regional emissions. Using a case study in Yolo County, California we demonstrate that forecasted changes in regional emissions are greatly affected by the regional growth assumption. In the absence of information about which regional growth assumption is accurate, we provide guidelines for selection of a conservative regional growth assumption. - Highlights: • Current tools inconsistently forecast GHG emissions from project-level development. • We outline five assumptions about how projects may affect regional growth. • Our assumptions capture a range of economic and population effects of projects. • Our case study shows that growth assumptions greatly affect regional GHG estimates. • We provide guidelines for selecting a conservative regional growth assumption

  1. Nature-inspired design strategies in sustainable product development : A case study of student projects

    NARCIS (Netherlands)

    De Pauw, I.C.; Karana, E.; Kandachar, P.V.

    2012-01-01

    In design practice, Nature-Inspired Design Strategies (NIDS) can be applied when developing sustainable products. However, knowledge on how this actually helps designers is lacking. This study explores the effects of applying Cradle to Cradle and Biomimicry in student projects, as compared to using

  2. Scarab/Saffron Development Project Case study: Material Selection Criteria for the Monoethylene Glycol Recovery Package

    International Nuclear Information System (INIS)

    Moussa, A.M.; Habib, S.; Shinaishin, A.

    2004-01-01

    MEG Recovery Unit for Scarab/Saffron development project is the first application in gas production. The Mono Ethylene Glycol Recovery Unit (MEG) recovers MEG from Water/MEG stream and removes salts and other contaminants. MEG Recovery Unit Equipment Design Criteria were designed for two parallel trains A and B, each train is capable to treat 500 bbl MEG, 1500 bbl water and 9 ton salt. The MEG unit is a combination of two unit operations; MEG Recovery unit is normally applicable in the oil and gas industries that is applying distillation technique, while the new technology is salt treatment and handling. The MEG Unit material selection is made to be suitable for the entire design life which is 25 years, the materials for MEG Recovery Unit have been selected among the available corrosion resistance alloys, where requested by the service and ambient conditions. Therefore all. the parts of the MEG unit that are in saline service are in either (2205 duplex, AISI 316L) and in Inconel alloy 625 related to operating temperature. This case study focused at Inconel alloy 625, which is selected for salt service and their operation problem occurred during the construction and operating conditions

  3. Evaluation of a Team Project Based Learning Module for Developing Employability Skills

    OpenAIRE

    Janice Whatley

    2012-01-01

    This paper presents a case study, in which a new module, aimed at enhancing students’ employ-ability skills, is evaluated. Employability skills for graduates from higher education are regarded as essential outcomes from their degree programmes, but it can be difficult to provide appropriate opportunities to develop these skills in the context of their studies. This paper describes a new module, called Live Projects, designed to provide project based learning on campus, but involv-ing local bu...

  4. The strategy of parallel approaches in projects with unforeseeable uncertainty: the Manhattan case in retrospect

    OpenAIRE

    Sylvain Lenfle

    2011-01-01

    International audience; This paper discusses the literature on the management of projects with unforeseeable uncertainty. Recent work demonstrates that, when confronted with unforeseeable uncertainties, managers can adopt either a learning, trial-and-error-based strategy, or a parallel approach. In the latter, different solutions are developed in parallel and the best one is chosen when enough information becomes available. Studying the case of the Manhattan Project, which historically exempl...

  5. Object Oriented Software Development Using A Use-Cases Approach

    African Journals Online (AJOL)

    This paper presents a systematic approach to the analysis and design of an online banking system using the Use-Cases method of Jacobson. This analysis and design method will support the development of highly effective reuseable code, thus bringing the benefits of object orientation into important software projects.

  6. Project-Based Learning in Electronic Technology: A Case Study

    Science.gov (United States)

    Li, Li

    2015-01-01

    A case study of project-based learning (PBL) implemented in Tianjin University of Technology and Education is presented. This multidiscipline project is innovated to meet the novel requirements of industry while keeping its traditional effectiveness in driving students to apply knowledge to practice and problem-solving. The implementation of PBL…

  7. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  8. Managing MDO Software Development Projects

    Science.gov (United States)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  9. The essential value of projects in faculty development.

    Science.gov (United States)

    Gusic, Maryellen E; Milner, Robert J; Tisdell, Elizabeth J; Taylor, Edward W; Quillen, David A; Thorndyke, Luanne E

    2010-09-01

    Projects--planned activities with specific goals and outcomes--have been used in faculty development programs to enhance participant learning and development. Projects have been employed most extensively in programs designed to develop faculty as educators. The authors review the literature and report the results of their 2008 study of the impact of projects within the Pennsylvania State University College of Medicine Junior Faculty Development Program, a comprehensive faculty development program. Using a mixed-methods approach, the products of project work, the academic productivity of program graduates, and the impact of projects on career development were analyzed. Faculty who achieved the most progress on their projects reported the highest number of academic products related to their project and the highest number of overall academic achievements. Faculty perceived that their project had three major effects on their professional development: production of a tangible outcome, development of a career focus, and development of relationships with mentors and peers. On the basis of these findings and a review of the literature, the authors conclude that projects are an essential element of a faculty development program. Projects provide a foundation for future academic success by enabling junior faculty to develop and hone knowledge and skills, identify a career focus and gain recognition within their community, generate scholarship, allocate time to academic work, and establish supportive relationships and collaborative networks. A list of best practices to successfully incorporate projects within faculty development programs is provided.

  10. Development of project financing in Russia

    Directory of Open Access Journals (Sweden)

    Nikonova Irina Aleksandrovna

    2012-07-01

    Full Text Available The implementation of effective investment projects is essential to the modernization of the Russian economy and its transition to a high-tech way of development. The most complex and risky form of financing projects is project financing (Project Finance.

  11. Development of clinical pharmacy in Belgian hospitals through pilot projects funded by the government.

    Science.gov (United States)

    Somers, A; Spinewine, A; Spriet, I; Steurbaut, S; Tulkens, P; Hecq, J D; Willems, L; Robays, H; Dhoore, M; Yaras, H; Vanden Bremt, I; Haelterman, M

    2018-04-30

    Objectives The goal is to develop clinical pharmacy in the Belgian hospitals to improve drug efficacy and to reduce drug-related problems. Methods From 2007 to 2014, financial support was provided by the Belgian federal government for the development of clinical pharmacy in Belgian hospitals. This project was guided by a national Advisory Working Group. Each funded hospital was obliged to describe yearly its clinical pharmacy activities. Results In 2007, 20 pharmacists were funded in 28 pilot hospitals; this number was doubled in 2009 to 40 pharmacists over 54 institutions, representing more than half of all acute Belgian hospitals. Most projects (72%) considered patient-related activities, whereas some projects (28%) had a hospital-wide approach. The projects targeted patients at admission (30%), during hospital stay (52%) or at discharge (18%). During hospital stay, actions were mainly focused on geriatric patients (20%), surgical patients (15%), and oncology patients (9%). Experiences, methods, and tools were shared during meetings and workshops. Structure, process, and outcome indicators were reported and strengths, weaknesses, opportunities, and threats were described. The yearly reports revealed that the hospital board was engaged in the project in 87% of the cases, and developed a vision on clinical pharmacy in 75% of the hospitals. In 2014, the pilot phase was replaced by structural financing for clinical pharmacy in all acute Belgian hospitals. Conclusion The pilot projects in clinical pharmacy funded by the federal government provided a unique opportunity to launch clinical pharmacy activities on a broad scale in Belgium. The results of the pilot projects showed clear implementation through case reports, time registrations, and indicators. Tools for clinical pharmacy activities were developed to overcome identified barriers. The engagement of hospital boards and the results of clinical pharmacy activities persuaded the government to start structural

  12. Local stakeholder participation in CDM and new climate mitigation mechanisms – case study of a small scale hydropower project in China

    DEFF Research Database (Denmark)

    Dong, Yan; Olsen, Karen Holm; Filzmoser, Eva

    2014-01-01

    and China’s stakeholder participation policies in environment impact assessment at project level, the PDD of this project and similar projects were analyzed providing an overall impression of the stakeholder participations process and results in such projects. Afterwards, we focused on a single case, where...... that the Clean Development Mechanism (CDM) Executive Board should collect information on practices for local stakeholder consultation in collaboration with the Designated National Authorities (DNA) Forum and provide technical assistance for the development of guidelines for local stakeholder participation......, if a country requests assistance. Learning from a case study of how local stakeholder participation is practiced in CDM in a small scale hydropower project in China, this paper identifies the strengths and weaknesses of how the concept is applied in practice. To understand the execution of both CDM policies...

  13. R&D Project Valuation Considering Changes of Economic Environment: A Case of a Pharmaceutical R&D Project

    Directory of Open Access Journals (Sweden)

    Jung Ho Park

    2018-03-01

    Full Text Available R&D project valuation is important for effective R&D portfolio management through decision making, related to the firm’s R&D productivity, sustainable management. In particular, scholars have emphasized the necessities of capturing option value in R&D and developed methods of real option valuation. However, despite suggesting various real option models, there are few studies on simultaneously employing mean-reverting stochastic process and Markov regime switching to describe the evolution of cash flow and to reflect time-varying parameters resulting from changes of economic environment. Therefore, we suggest a mean-reverting binomial lattice model under Markov regime switching and apply it to evaluate clinical development with project cases of the pharmaceutical industry. This study finds that decision making can be different according to the regime condition, thus the suggested model can capture risks caused by the uncertainty of the economic environment, represented by regime switching. Further, this study simulates the model according to rate parameter from 0.00 to 1.00 and risk-free interest rates for regimes 1 and 2 from ( r 1 = 4%, r 2 = 2% to ( r 1 = 7%, r 2 = 5%, and confirms the rigidity of the model. Therefore, in practice, the mean-reverting binomial lattice model under Markov regime switching proposed in this study for R&D project valuation contributes to assisting company R&D project managers make effective decision making considering current economic environment and future changes.

  14. Geo-scientific Information in the Radioactive Waste Management Safety Case Main Messages from the AMIGO Project

    International Nuclear Information System (INIS)

    2010-01-01

    Radioactive waste is associated with all phases of the nuclear fuel cycle as well as the use of radioactive materials in medicine, research and industry. For the most hazardous and long-lived waste, the solution being investigated worldwide is disposal in engineered repositories deep underground. The importance of geo-scientific information in selecting a site for geological disposal has long been recognised, but there has been growing acknowledgement of the broader role of this information in assessing and documenting the safety of disposal. The OECD/NEA Approaches and Methods for Integrating Geological Information in the Safety Case (AMIGO) project has demonstrated that geological data and understanding serve numerous roles in safety cases. The project, which ran from 2002 to 2008, underscored the importance of integrating geo-scientific information in the development of a disposal safety case and increasingly in the overall process of repository development, including, for example, siting decisions and ensuring the practical feasibility of repository layout and engineering. (authors)

  15. Development and implementation of a science training course for breast cancer activists: Project LEAD (leadership, education and advocacy development).

    Science.gov (United States)

    Dickersin, K; Braun, L; Mead, M; Millikan, R; Wu, A M; Pietenpol, J; Troyan, S; Anderson, B; Visco, F

    2001-12-01

    To develop and implement Project LEAD (leadership, education, and advocacy development), a science course for breast cancer activists. Students were breast cancer activists and other consumers, mainly affiliated with advocacy organizations in the United States of America. Project LEAD is offered by the National Breast Cancer Coalition; the course takes place over 5 days and is offered 4 times a year, in various cities in the United States of America. The Project LEAD curriculum has developed over 5 years to include lectures, problem-based study groups, case studies, interactive critical appraisal sessions, a seminar by an 'expert' scientist, role play, and homework components. A core faculty has been valuable for evaluating and revising the course and has proved necessary to provide consistent high quality teaching. Course evaluations indicated that students gained critical appraisal skills, enhanced their knowledge and developed confidence in selected areas of basic science and epidemiology. Project LEAD comprises a unique curriculum for training breast cancer activists in science and critical appraisal. Course evaluations indicate that students gain confidence and skills from the course.

  16. On e-Government Project Development in Balmeda

    Science.gov (United States)

    Anagnostou, Miltiades E.; Lambrou, Maria A.

    An e-government project management and development scenario in a fictional country is described. Emphasis is given on how local culture undermines project quality. A detailed fictional project development scenario is presented. The interplay between different players, i.e. project developers, reviewers, and public services, is illustrated. While the rules of technology are the same everywhere, local adaptation due to socio-economic factors can bend them to the degree of making them ineffective.

  17. Sustainable energy for cashew production chain using innovative clean technology project developments

    Energy Technology Data Exchange (ETDEWEB)

    Pannir Selvam, P.V.; Nandenha, Julio; Santiago, Brunno Henrique de Souza; Silva, Rosalia Tatiane da [Universidade Federal do Rio Grande do Norte (GPEC/DEQ/UFRN), Lagoa Nova, RN (Brazil). Dept. de Engenharia Quimica. Grupo de Pesquisa em Engenharia de Custos e Processos], e-mail: pannirbr@gmail.com

    2006-07-01

    The main objective is to develop a new process synthesis based on the residual biomass waste for the energy production applied to the fruit processing plant with co-production of hot, cold thermal energy using biogas from the wood biomass and animal wastes. After carried out the bibliographical research about the current state of art technology, an engineering project had been developed with the use of the software Super Pro Designer V 4.9. Some simulations of processes of the fast pyrolysis, gasification, bio digestion, generation of energy have been realized including the system integration of energy production as innovation of the present work. Three cases study have been developed: first, the current process of conventional energy using combustion, another one using combined pyrolysis and gasification, and the last one with bio digestion for combined power, heat and chilling. The results about the project investment and the cost analysis, economic viability and cash balance were obtained using software Orc 2004. Several techno-economic parameters of the selected cases study involving process innovation were obtained and compared, where a better energy and materials utilization were observed in relation to conventional process. This project which is still in development phase, involves small scale energy integrated system design. The energy and the process integration cashew fruit production chain, based on the clean technology process design, has enable significant improvement in terms of economic and environmental using optimal system configurations with viability and sustainability. (author)

  18. Developing Mathematical Literacy through project work: A teacher/teaching perspective

    Directory of Open Access Journals (Sweden)

    Renuka Vithal

    2006-10-01

    Full Text Available The implementation of the new Mathematical Literacy curriculum in South Africa is assuming several different conceptions of mathematics and therefore also being realised through a range of different pedagogies. In this paper I begin from a particular privileging of a critical perspective in mathematics education, which I argue is one (among others of the forces shaping the new South African curriculum reforms, particularly the Mathematical Literacy curriculum. If so, then the case for a specific pedagogy, that of project work, can be shown to support the development of a mathematical literacy from a critical perspective. In this paper a particular set of conceptual tools, principles and practices associated with project work, as developed in the Scandanavian context but researched in South Africa, are elaborated from the perspective of teachers/teaching of mathematical literacy.

  19. The formation of a risk management system for projects in the field of aquaculture innovative development in the Kaliningrad region: a case study

    Directory of Open Access Journals (Sweden)

    Serbulov Alexey

    2012-03-01

    Full Text Available This article sets out to develop the concept and the principal scheme of the formation of a risk management system for innovative economic development projects in the field of aquaculture. The research carried out by the authors helps identify the main problems and characteristics of risk management projects for the development of aquaculture in presentday Russia. The authors outline the status and features of aquaculture development projects in the North-western federal district and the Kaliningrad region. The article formulates and justifies the concept of “risk management projects in innovative development of aquaculture in the region” focusing on the classification of aquaculture risks in relation to innovative development projects, which expands the conceptual framework of risk management in view of the specific risks relating to economic development projects in the field of aquaculture. The authors characterize modern methods and approaches to risk management projects and organizations in the context of their application in the framework of aquaculture development projects and offer mechanisms for risk management of aquaculture development projects, which make it possible to include risk management activity in the general context of activities of parent project organizations. The authors develop the concept and principal scheme of the formation of risk management system for innovative development projects in aquaculture.

  20. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  1. Baseline methodologies for clean development mechanism projects

    Energy Technology Data Exchange (ETDEWEB)

    Lee, M.K. (ed.); Shrestha, R.M.; Sharma, S.; Timilsina, G.R.; Kumar, S.

    2005-11-15

    The Kyoto Protocol and the Clean Development Mechanism (CDM) came into force on 16th February 2005 with its ratification by Russia. The increasing momentum of this process is reflected in more than 100 projects having been submitted to the CDM Executive Board (CDM-EB) for approval of the baselines and monitoring methodologies, which is the first step in developing and implementing CDM projects. A CDM project should result in a net decrease of GHG emissions below any level that would have resulted from other activities implemented in the absence of that CDM project. The 'baseline' defines the GHG emissions of activities that would have been implemented in the absence of a CDM project. The baseline methodology is the process/algorithm for establishing that baseline. The baseline, along with the baseline methodology, are thus the most critical element of any CDM project towards meeting the important criteria of CDM, which are that a CDM should result in 'real, measurable, and long term benefits related to the mitigation of climate change'. This guidebook is produced within the frame work of the United Nations Environment Programme (UNEP) facilitated 'Capacity Development for the Clean Development Mechanism (CD4CDM)' Project. This document is published as part of the projects effort to develop guidebooks that cover important issues such as project finance, sustainability impacts, legal framework and institutional framework. These materials are aimed to help stakeholders better understand the CDM and are believed to eventually contribute to maximize the effect of the CDM in achieving the ultimate goal of UNFCCC and its Kyoto Protocol. This Guidebook should be read in conjunction with the information provided in the two other guidebooks entitled, 'Clean Development Mechanism: Introduction to the CDM' and 'CDM Information and Guidebook' developed under the CD4CDM project. (BA)

  2. Baseline methodologies for clean development mechanism projects

    International Nuclear Information System (INIS)

    Lee, M.K.; Shrestha, R.M.; Sharma, S.; Timilsina, G.R.; Kumar, S.

    2005-11-01

    The Kyoto Protocol and the Clean Development Mechanism (CDM) came into force on 16th February 2005 with its ratification by Russia. The increasing momentum of this process is reflected in more than 100 projects having been submitted to the CDM Executive Board (CDM-EB) for approval of the baselines and monitoring methodologies, which is the first step in developing and implementing CDM projects. A CDM project should result in a net decrease of GHG emissions below any level that would have resulted from other activities implemented in the absence of that CDM project. The 'baseline' defines the GHG emissions of activities that would have been implemented in the absence of a CDM project. The baseline methodology is the process/algorithm for establishing that baseline. The baseline, along with the baseline methodology, are thus the most critical element of any CDM project towards meeting the important criteria of CDM, which are that a CDM should result in 'real, measurable, and long term benefits related to the mitigation of climate change'. This guidebook is produced within the frame work of the United Nations Environment Programme (UNEP) facilitated 'Capacity Development for the Clean Development Mechanism (CD4CDM)' Project. This document is published as part of the projects effort to develop guidebooks that cover important issues such as project finance, sustainability impacts, legal framework and institutional framework. These materials are aimed to help stakeholders better understand the CDM and are believed to eventually contribute to maximize the effect of the CDM in achieving the ultimate goal of UNFCCC and its Kyoto Protocol. This Guidebook should be read in conjunction with the information provided in the two other guidebooks entitled, 'Clean Development Mechanism: Introduction to the CDM' and 'CDM Information and Guidebook' developed under the CD4CDM project. (BA)

  3. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    Science.gov (United States)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  4. Developing a green lending model for renewable energy project (case study electricity from biogas fuel at Palm Oil Industry)

    Science.gov (United States)

    Sukirman, Y. A.

    2018-03-01

    In the last two decades, development initiatives solely aimed to generate economic growth has been placed under scrutiny, particularly amidst the rampant discussion on the quality decline of the environment, growing social divide and climate change along with its implications thereof. Considerations of the negative impacts brought about by the economic development process prompted the move to adopt the sustainable financing model that gives precedence to economic, environmental and social aspects. We introduced Green Lending Model for Renewable Energy Project (Case Study Electricity From Biogas at Palm Oil Industry) based on sustainability financing, which is used as variable to implementing financial institutions’ lending policies. There are two major trends in the literature relating to sustainability and the banking industry: external and internal practices. The external practices strand analyzes the relevance of sustainability to the bank’s communication with shareholders and other stakeholders, and how investors use it as a measure to help achieve optimal portfolio allocation. The internal practices literature, more relevant to the present work, studies how sustainability criteria are integrated into risk management models and lending practices. Its first implementation is in the Palm Oil industry at South Sumatera. The results explained that sustainability is not related to profit either from a short- or long-term perspective. The Sustainable Green Lending Model is related to the Equator Principles and its application is driven to project financing. It also related with short- and long-term risks and opportunities, instead of short-term sustainability impacts.

  5. Learning from case studies and monitoring of Dutch tunnel projects

    NARCIS (Netherlands)

    Korff, M.

    2017-01-01

    Individuals and project-based organisations in the construction industry can learn in a (more) systematic way from case studies and the monitoring of underground construction works. Underground construction projects such as tunnels and excavations suffer as much or more from failure costs

  6. Nuclear propulsion technology development - A joint NASA/Department of Energy project

    Science.gov (United States)

    Clark, John S.

    1992-01-01

    NASA-Lewis has undertaken the conceptual development of spacecraft nuclear propulsion systems with DOE support, in order to establish the bases for Space Exploration Initiative lunar and Mars missions. This conceptual evolution project encompasses nuclear thermal propulsion (NTP) and nuclear electric propulsion (NEP) systems. A technology base exists for NTP in the NERVA program files; more fundamental development efforts are entailed in the case of NEP, but this option is noted to offer greater advantages in the long term.

  7. Estimating software development project size, using probabilistic ...

    African Journals Online (AJOL)

    Estimating software development project size, using probabilistic techniques. ... of managing the size of software development projects by Purchasers (Clients) and Vendors (Development ... EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  8. [Case control trial on putative factors antagonising the successful project course of MD thesis projects].

    Science.gov (United States)

    Scharfenberg, J; Schaper, K; Krummenauer, F

    2015-05-01

    Award of the degree MD has special relevance in Germany since the underlying research project can be started during the qualification for admission to doctoral training. This leads to a large number of thesis projects with a not always sufficiently pronounced enthusiasm and thus poor chances of success. Accordingly a case control study was undertaken in the Department of Human Medicine, Witten/Herdecke University to investigate reported drop-outs of thesis projects. In autumn 2012 all students in the clinical phases of human medicine education were surveyed using a self-conceived questionnaire on previously initiated or terminated thesis projects, "terminated" is defined as the unsuccessful ending of a project after working for at least 3 months. Individually reported thesis terminations were evaluated using defined items in a 4-stage Likert scale regarding thesis plan and project, subsequently, graduate students who successfully completed a project received the same questionnaire. The items possibly corresponding to process determinants were averaged to a total of 7 dimensions prior to the analysis; the resulting scores were normalised in value ranges 0.0 to 1.0 (1.0 = optimal project situation) whereby individual items could be included in several scores. By means of 5 items a primary endpoint from the faculty's perspective on "compliance with formal procedures" was aggregated; by means of a two-sided Wilcoxon test at the 5 % level students with unsuccessful and successful courses were compared along the corresponding scores. 181 of 276 students from 7 study semesters participated in the screening; details of 17 terminations and 23 currently successful courses could be evaluated in the case control study. For significant differences (p thesis projects to the responsible committees. A weakness is the low number of evaluable self-reported drop-outs as well as the overall moderate response rate. Georg Thieme Verlag KG Stuttgart · New York.

  9. Understanding and Managing Process Interaction in IS Development Projects

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel

    2012-01-01

    Software-based information systems must be developed and implemented as a part of business change. This is a major challenge, since business change and the development of software-based information systems usually are performed in separate processes. Thus, there is a need to understand and manage...... critical events in the case, what led to the events, and what the consequences are. We discuss the implications for information systems research and in particular we discuss the contribution to project management of iterative and incremental software development.......Software-based information systems must be developed and implemented as a part of business change. This is a major challenge, since business change and the development of software-based information systems usually are performed in separate processes. Thus, there is a need to understand and manage...

  10. Clean Development Mechanism” projects in the developing countries within the Kyoto protocol: problem analysis of a case study in Morocco

    Directory of Open Access Journals (Sweden)

    Gaglioppa P

    2009-11-01

    Full Text Available An internship period spent in the north of Morocco kingdom (Tetouan gave a contribute to the organization activity in promoting sustainable development in the rural areas under the Kyoto Protocol. The multitasking project will increase biodiversity planting trees for wood, forage and fruits productions. The paper show a first step study to evaluate the possibility to reach an agreement with the propriety and the manager of these areas in a multifunctional reforestation project. The eligible site suitable for reforestation in accordance with the CDM international scheme is a large plateau (more than 5000 hectares 600 meters high on the sea level far from the Cannabis crops area. The evaluation of the project costs and of the social benefits for the population consider (using different species the indigenous communities necessity. The evaluation of carbon sequestration show the small scale of the reforestation project on behalf of the Kyoto Protocol, but give also an idea about the people rights and necessities. The normal afforestation and reforestation projects, under the Kyoto Protocol, try to maximize the CO2 sequestration in a short time, than business laws usually require. A small scale project could be self-managing, less expensive (international certification costs and more interesting for local communities.

  11. Case study of the interdisciplinary integration in an IST-E3 project

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik

    2002-01-01

    Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission.......Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission....

  12. The development of an acute care case manager orientation.

    Science.gov (United States)

    Strzelecki, S; Brobst, R

    1997-01-01

    The authors describe the development of an inpatient acute care case manager orientation in a community hospital. Benner's application of the Dreyfus model of skill acquisition provides the basis for the orientation program. The candidates for the case manager position were expert clinicians. Because of the role change it was projected that they would function as advanced beginners. It was also predicted that, as the case managers progressed within the role, the educational process would need to be adapted to facilitate progression of skills to the proficient level. Feedback from participants reinforced that the model supported the case manager in the role transition. In addition, the model provided a predictive framework for ongoing educational activities.

  13. Customer Ranking Model for Project Businesses: A Case Study from the Automotive Industry

    Directory of Open Access Journals (Sweden)

    Bernd Markus Zunk

    2014-03-01

    Full Text Available For technology-orientated enterprises that operate project-based businesses, the goal-oriented allocation of scarce marketing resources has great potential to help consolidate their competitive position. An important precondition for goal-oriented management is the identification of the most valuable customers. This enables technology-orientated enterprises to segment markets in order to make tactical marketing decisions. This theorybased paper aims to develop and test a holistic customer ranking model. By deploying the five steps presented in this paper, customer relationship managers are better able to identify and to rank their customers in project-based businesses. A case study provides an example of the application of the method from the automotive industry in Austria. The experiences derived from this case study show that using a customer ranking framework is a crucial factor for enterprises in narrow technology markets to be successful and to achieve their corporate goals.

  14. Study on Risk Approaches in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Claudiu BRANDAS

    2012-01-01

    Full Text Available Risk approaches in project development led to the integration in the IT project management methodologies and software development of activities and processes of risk management. The diversity and the advanced level of the used technologies in IT projects with increasing com-plexity leads to an exponential diversification of risk factors.The purpose of this research is to identify the level of the risk approach in IT projects both at the IT project management and software development methodologies level and the level of the perception of IT project man-agers, IT managers and IT analysts in Romanian IT companies. Thus, we want to determine the correlation between the use of a project management or software development methodology and the overall level of risk perceived by the project managers using these methodologies.

  15. Private Sector-led Urban Development Projects. Management, Partnerships and Effects in the Netherlands and the UK

    Directory of Open Access Journals (Sweden)

    Erwin Heurkens

    2012-09-01

    Full Text Available Central to this research lays the concept of private sector-led urban development projects (Heurkens, 2010. Such projects involve project developers taking a leading role and local authorities adopting a facilitating role, in managing the development of an urban area, based on a clear public-private role division. Such a development strategy is quite common in Anglo-Saxon urban development practices, but is less known in Continental European practices. Nonetheless, since the beginning of the millennium such a development strategy also occurred in the Netherlands in the form of ‘concessions’. However, remarkably little empirical knowledge is available about how public and private actors collaborate on and manage private sector-led urban development projects. Moreover, it remains unclear what the effects of such projects are. This dissertation provides an understanding of the various characteristics of private sector-led urban development projects by conducting empirical case study research in the institutional contexts of the Netherlands and the UK. The research provides an answer to the following research question: What can we learn from private sector-led urban development projects in the Netherlands and UK in terms of the collaborative and managerial roles of public and private actors, and the effects of their (interactions? Indications for a market-oriented Dutch urban development practice Urban development practice in the Netherlands has been subject to changes pointing towards more private sector involvement in the built environment in the past decades. Although the current economic recession might indicate otherwise, there are several motives that indicate a continuation of private sector involvement and a private leadership role in Dutch urban development projects in the future. First, a shift towards more market-oriented development practice is the result of an evolutionary process of increased ‘neoliberalization’ and the

  16. Interdisciplinarity in Tech Startups DevelopmentCase Study of ‘Unistartapp’ Project

    Directory of Open Access Journals (Sweden)

    Kopera Sebastian

    2018-03-01

    Full Text Available Empirical data as well as scientific reports confirm that startups require diverse, in-house competencies in order to achieve market success. However, while technology-related competencies are usually brought to new tech ventures by their founders, there is a significant deficiency of market- and management-related competencies, which is reflected in the statistics of common startup failure reasons. In this context, a question arises: how interdisciplinarity of knowledge and competencies can be built into the very core of tech startups? The text addresses this question by zeroing in on the role of universities in this process. In the first part, the specificity of tech startups is analyzed. The next chapter overviews the hitherto academy-related startup education environment together with its shortcomings as far as interdisciplinarity is concerned. Finally, the case study of innovative and interdisciplinary academic ecosystem, which was built and tested within the project UniStartApp, is presented and discussed together with related lessons learned. The text is concluded with final remarks on challenges involved in embedding interdisciplinarity into startup education ecosystem.

  17. The value of flexibility in offshore oil field development projects

    Energy Technology Data Exchange (ETDEWEB)

    Lund, Morten Wattengaard

    1997-12-31

    Offshore oil field development projects often face substantial uncertainties and the operator`s ability to take corrective actions is very important. The main objective of this thesis was to identify the value of flexibility in such projects. Estimates obtained from exploratory wells can be dependent through common information. The effect of stochastic dependence was illustrated by an analytical model, where the dependence was expressed in terms of correlation between estimate errors. It was found that a high degree of correlation might distort the benefit of additional exploration. A prototype that covered the major phases of the project was developed to study the value of flexibility. The prototype was a Markov decision process, solved by stochastic dynamic programming. Based on discussions with Norwegian oil companies, three uncertain variables were addressed: the reservoir volume, the well rate, and the oil price. Simple descriptions were used to mimic the uncertainty. The reservoir was thus depicted as a tank model, and the well rate and oil prices were assumed to follow Markov processes. Flexibility was restricted to managerial as opposed to financial flexibility. Application of the prototype to a case study, based on an ongoing field development, showed that flexibility might be of considerable value to the project. In particular, capacity flexibility and initiation flexibility were identified as important aspects of the development. The results also emphasized the importance of a joint assessment, as the values of different flexibility types are not additive. In conclusion, the proposed model motivates further development of the decision support system presently available. Future decision making should therefore be made within a framework that gives consideration to flexibility. 129 refs., 46 figs., 23 tabs.

  18. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM: A Case-Study on Oil and Gas Projects, the Piping Process

    Directory of Open Access Journals (Sweden)

    Sung-Hwan Jo

    2018-05-01

    Full Text Available Engineering, Procurement, and Construction (EPC of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping works (prefabrication and installation occupying a majority of that schedule. As such, an effective methodology for scheduling, planning, and controlling of piping activities is essential for project success. To meet this need, this study used the Critical Chain Project Management (CCPM to develop a piping construction delay prevention methodology, incorporating material procurement processes for EPC megaprojects. Recent studies indicate that the traditional scheduling method used on oil and gas mega projects has critical limitations regarding resource scarcity, calculation of activity duration, and dealing with uncertainties. To overcome these limitations, the Theory of Constraints-based CCPM was proposed and implemented to provide schedule buffers management. Nonexistent in literature, and of critical importance, is this paper’s focus on the resource buffer, representing material uncertainty and management. Furthermore, this paper presents a step-by-step process and flow chart for project, construction, and material managers to effectively manage a resource buffer through the CCPM process. This study extends the knowledge of traditional resource buffers in CCPM to improve material and procurement management, thus avoiding the shortage of piping materials and minimizing delays. The resultant process was validated by both deterministic and probabilistic schedule analysis through two case studies of a crude pump unit and propylene compressor installation at a Middle Eastern Refinery Plant Installation. The results show that the CCPM method effectively handles uncertainty, reducing the duration of piping works construction by about a 35% when compared to the traditional method. Furthermore, the

  19. Using the Lashof Accounting Methodology to Assess Carbon Mitigation Projects Using LCA: Ethanol Biofuel as a Case Study

    DEFF Research Database (Denmark)

    Courchesne, Alexandre; Becaert, Valerie; Rosenbaum, Ralph K.

    2010-01-01

    and comparison of different carbon mitigation projects (e.g. biofuel use, sequestering plant, afforestation project, etc.). The Lashof accounting methodology is chosen amid other methods of greenhouse gas (GHG) emission characterization for its relative simplicity and capability of characterizing all types...... of carbon mitigation projects. It calculates the cumulative radiative forcing caused by GHG emission within a predetermined time frame. Basically, the developed framework uses the Mg-year as a functional unit and isolates impacts related to the climate mitigation function with system expansion. The proposed...... framework is demonstrated with a case study of tree ethanol pathways (maize, sugarcane and willow). Study shows that carbon mitigation assessment through LCA is possible and that it could be a useful tool for decision makers as it can compare different projects regardless of their original context. Case...

  20. 75 FR 22674 - Moynihan Station Development Project

    Science.gov (United States)

    2010-04-29

    ... DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Moynihan Station Development Project... availability of and public comment period for the Moynihan Station Development Project Environmental Assessment... 22675

  1. Hualapai Tribal Utility Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Hualapai Tribal Nation

    2008-05-25

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon

  2. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  3. Exploration of Exploitation Approaches of European Projects on ICT and Foreign Language Learning: the CEFcult project case

    NARCIS (Netherlands)

    Rusman, Ellen; Rajagopal, Kamakshi; Stoyanov, Slavi; Van Maele, Jan

    2011-01-01

    Rusman, E., Rajagopal, K., Stoyanov, S., & Van Maele, J. (2011, 20-21 October). Exploration of Exploitation Approaches of European Projects on ICT and Foreign Language Learning: the CEFcult project case. Paper presented at the 4th International Conference ICT for Language Learning, Florence, Italy.

  4. Methodology for economic evaluation of software development projects

    International Nuclear Information System (INIS)

    Witte, D.M.

    1990-01-01

    Many oil and gas exploration and production companies develop computer software in-house or with contract programmers to support their exploration activities. Software development projects compete for funding with exploration and development projects, though most companies lack valid comparison measures for the two types of projects. This paper presents a methodology of pro form a cash flow analysis for software development proposals intended for internal use. This methodology, based on estimates of development and support costs, exploration benefits, and probability of successful development and implementation, can be used to compare proposed software development projects directly with competing exploration proposals

  5. Status of LMFBR development project in Japan

    International Nuclear Information System (INIS)

    Nagane, G.; Akebi, M.; Matsuno, Y.

    1987-01-01

    Initiation of the LMFBR development project in Japan was decided by the Atomic Energy Commission of Japan in 1966. In 1967, the Power Reactor and Nuclear Fuel Development Corporation (PNC) was established to realize the project as a part of its tasks of a wide scope covering all the reseatch and development activities concerning fuel cycle. In the present paper the status of experimental fast reactor (Joyo), which is the first milestone of the LMFBR project, prototype fast reactor (Monju) and R and D activities supporting the project including that for larger LMFBRs in the future is described. (author)

  6. Development of a database system for near-future climate change projections under the Japanese National Project SI-CAT

    Science.gov (United States)

    Nakagawa, Y.; Kawahara, S.; Araki, F.; Matsuoka, D.; Ishikawa, Y.; Fujita, M.; Sugimoto, S.; Okada, Y.; Kawazoe, S.; Watanabe, S.; Ishii, M.; Mizuta, R.; Murata, A.; Kawase, H.

    2017-12-01

    . Techniques of the database system for near-future climate change projections might be quite useful for simulation and observational data in other research fields. We report current status of development and some case studies of the database system for near-future climate change projections.

  7. Developing Tools to Counteract and Prevent Suicide Bomber Incidents: A Case Study in Value Sensitive Design.

    Science.gov (United States)

    Royakkers, Lambèr; Steen, Marc

    2017-08-01

    Developers and designers make all sorts of moral decisions throughout an innovation project. In this article, we describe how teams of developers and designers engaged with ethics in the early phases of innovation based on case studies in the SUBCOP project (SUBCOP stands for 'SUicide Bomber COunteraction and Prevention'). For that purpose, Value Sensitive Design (VSD) will be used as a reference. Specifically, we focus on the following two research questions: How can researchers/developers learn about users' perspectives and values during the innovation process? and How can researchers/developers take into account these values, and related design criteria, in their decision-making during the innovation process? Based on a case study of several innovation processes in this project, we conclude the researchers/developers involved are able to do something similar to VSD (without them knowing about VSD or calling it 'VSD'), supported by relatively simple exercises in the project, e.g., meetings with potential end-users and discussions with members of the Ethical Advisory Board of the project. Furthermore, we also found-possibly somewhat counterintuitively-that a commercial, with its focus on understanding and satisfying customers' needs, can promote VSD.

  8. The use of public participation and economic appraisal for public involvement in large-scale hydropower projects: Case study of the Nam Theun 2 Hydropower Project

    International Nuclear Information System (INIS)

    Mirumachi, Naho; Torriti, Jacopo

    2012-01-01

    Gaining public acceptance is one of the main issues with large-scale low-carbon projects such as hydropower development. It has been recommended by the World Commission on Dams that to gain public acceptance, public involvement is necessary in the decision-making process (). As financially-significant actors in the planning and implementation of large-scale hydropower projects in developing country contexts, the paper examines the ways in which public involvement may be influenced by international financial institutions. Using the case study of the Nam Theun 2 Hydropower Project in Laos, the paper analyses how public involvement facilitated by the Asian Development Bank had a bearing on procedural and distributional justice. The paper analyses the extent of public participation and the assessment of full social and environmental costs of the project in the Cost-Benefit Analysis conducted during the project appraisal stage. It is argued that while efforts were made to involve the public, there were several factors that influenced procedural and distributional justice: the late contribution of the Asian Development Bank in the project appraisal stage; and the issue of non-market values and discount rate to calculate the full social and environmental costs. - Highlights: ► Public acceptance in large-scale hydropower projects is examined. ► Both procedural and distributional justice are important for public acceptance. ► International Financial Institutions can influence the level of public involvement. ► Public involvement benefits consideration of non-market values and discount rates.

  9. The Perceived Impact of the Agile Development and Project Management Method Scrum on Information Systems and Software Development Productivity

    DEFF Research Database (Denmark)

    Kautz, Karlheinz; Johansen, Thomas Heide; Uldahl, Andreas

    2013-01-01

    This research contributes to the body of knowledge in information systems development (ISD) with an empirical investigation in form of a case study that demonstrates the positive impact of the agile development and project management method Scrum on information systems and software development...... productivity and it provides a useful operationalization of the concept through seven identified indicators for productivity. Despite the fact that the case unit had challenges with the use of Scrum, the indicators identified the areas where the company had managed to exploit the potential of Scrum and its...... practices with regard to increasing productivity. The research results are discussed both with regard to the existing Scrum literature as well as to complex adaptive systems (CAS) as a foundation for ISD and agile development....

  10. Landfill Gas Energy Project Development Handbook

    Science.gov (United States)

    View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.

  11. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  12. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  13. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  14. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  15. Academy of Program/Project & Engineering Leadership: APPEL Case Studies

    Data.gov (United States)

    National Aeronautics and Space Administration — Case studies illustrate the kinds of decisions and dilemmas managers face every day, and as such provide an effective learning tool for project management. Due to...

  16. Academy of Program/Project & Engineering Leadership: Interactive Case Studies

    Data.gov (United States)

    National Aeronautics and Space Administration — Case studies illustrate the kinds of decisions and dilemmas managers face every day, and as such provide an effective learning tool for project management. Due to...

  17. The Challenge of Implementing an ERP System in a Small and Medium Enterprise--A Teaching Case of ERP Project Management

    Science.gov (United States)

    Xu, Hongjiang; Rondeau, Patrick J.; Mahenthiran, Sakthi

    2011-01-01

    Enterprise Resource Planning (ERP) system implementation projects are notoriously risky. While large-scale ERP cases continue to be developed, relatively few new ERP cases have been published that further ERP implementation education in small to medium size firms. This case details the implementation of a new ERP system in a medium sized…

  18. Cross-border software development of health information system: A case study on project between India and Pakistan based on open source software

    OpenAIRE

    Sabir, Uzma

    2017-01-01

    Global software development is a phenomenon that is receiving considerable interest from researchers during past two decades. Several challenges have been identified and approaches to deal with these challenges have been developed. Typically, western companies outsource their projects to countries where costs are lower and skilled professionals are easily available. Majority of these projects are developed for commercial purposes. However, software development projects between India and Pakis...

  19. Project finance and international energy development

    International Nuclear Information System (INIS)

    Pollio, G.

    1998-01-01

    This paper explores the preference for and the features unique to project finance, one of the favoured vehicles for funding energy development. Our main focus is on the interests of project sponsors, commercial banks and host governments. Inclusion of the latter reflects the fact host governments are often leading participants in primary energy and energy-related projects; more recently, they have come to use limited recourse structures to finance local infrastructure development. Traditional analyses, whilst providing useful insights into the interests of leading project participants, are incapable of isolation a single motive or set of motives that can comprehensively account for all of the features common to this form of debt. Within an options-theoretic framework, most of these ambiguities are resolved. Risk management, long recognised as one of the primary reasons for choosing project finance over rival debt structures, is affirmed as a key explanatory factor. One the other hand, options pricing theory provides a radically different perspective on how to project finance contributes to the realisation of these objectives. (author)

  20. Sniffer project development

    CERN Document Server

    Grau, S; CERN. Geneva. ST Division

    2002-01-01

    To ensure the safety of the personnel, and prevent major damage to the equipment in the LHC experiments, a combined fire and gas detection system is being developed in conjunction with the industry. This system named SNIFFER, shall detect fire, flammable gas leaks and oxygen deficiency. In addition it shall interface with the Experiments' Control System and the CERN Safety Alarm Monitoring system. The SNIFFER project is currently at the end of the prototyping phase, and the technical specification is being written for the outsourcing of the system. The purpose of this document is to describe the main functions, constraints and interfaces of the system, to present the status report and planning of the project, and to explain the preliminary conclusions of the prototyping phase.

  1. Community Development and Divergent Forces in Philippine State Universities and Colleges: Developing a Protocol in Evaluating Extension Projects Towards Community Empowerment

    Directory of Open Access Journals (Sweden)

    Dexter S. Ontoy

    2016-11-01

    Full Text Available Divergent paradigms operate in State Universities and Colleges SUCs, which influence the performance of extension projects towards attainment of full empowerment as the ultimate goal implied by the universally-accepted definition of community development. In particular, a livelihood and environment project of Cebu Normal University (CNU implemented in Caputatan Norte, Medillin, Cebu, Philippines was assessed based on five (5 primary parameters and two (2 secondary parameters. A novel protocol using Delphi Method shows was developed and used for this particular study, which could be adapted in evaluating the performance of community extension projects. In this particular case, the performance of CNU livelihood and environment project falls between ―demonstration‖ and ―community organizing‖. The evaluation shows that there is still a need to reinforce activities to the ultimate goal. However, it is also implied that the secondary parameters are more robust indicators in assessing the outcomes of the project implementation towards full community empowerment.

  2. Testing Software Development Project Productivity Model

    Science.gov (United States)

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  3. The corporate impact of addressing social issues: a financial case study of a project in Peru.

    Science.gov (United States)

    Dabbs, Alan; Bateson, Matthew

    2002-05-01

    Large, multinational resource development projects can affect many aspects, including social, economic and ecological realities, in the regions where they operate. Social and environmental issues that are usually ignored in such projects are increasingly affecting the financial future of multinational corporations in negative ways. In this article, we advance the argument that corporations can successfully manage these issues and that if they choose to view these management efforts as an investment rather than an expense, they may well acquire a competitive advantage over companies that do not. We describe as a case study the Camisea natural gas and condensates development project in Peru, operated by Shell Prospecting and Development Peru (SPDP). Camisea is one of the first projects anywhere in the world to conduct a detailed analysis of key industry-related social issues and the processes, required investment and financial impact of managing them. The Camisea example supports the argument that addressing social and environmental concerns makes financial sense. In present value terms, the benefit of managing these concerns was expected to surpass the cost investment by approximately US$50 million.

  4. Process, cost modeling and simulations for integrated project development of biomass for fuel and protein

    International Nuclear Information System (INIS)

    Pannir Selvam, P.V.; Wolff, D.M.B.; Souza Melo, H.N.

    1998-01-01

    The construction of the models for biomass project development are described. These models, first constructed using QPRO electronic spread sheet for Windows, are now being developed with the aid of visual and object oriented program as tools using DELPHI V.1 for windows and process simulator SUPERPRO, V.2.7 Intelligent Inc. These models render the process development problems with economic objectives to be solved very rapidly. The preliminary analysis of cost and investments of biomass utilisation projects which are included for this study are: steam, ammonia, carbon dioxide and alkali pretreatment process, methane gas production using anaerobic digestion process, aerobic composting, ethanol fermentation and distillation, effluent treatments using high rate algae production as well as cogeneration of energy for drying. The main project under developments are the biomass valuation projects with the elephant (Napier) grass, sugar cane bagasse and microalgae, using models for mass balance, equipment and production cost. The sensibility analyses are carried out to account for stochastic variation of the process yield, production volume, price variations, using Monte Carlo method. These models allow the identification of economical and scale up problems of the technology. The results obtained with few preliminary project development with few case studies are reported for integrated project development for fuel and protein using process and cost simulation models. (author)

  5. Renewable energy project development

    Energy Technology Data Exchange (ETDEWEB)

    Ohi, J.

    1996-12-31

    The author presents this paper with three main thrusts. The first is to discuss the implementation of renewable energy options in China, the second is to identify the key project development steps necessary to implement such programs, and finally is to develop recommendations in the form of key issues which must be addressed in developing such a program, and key technical assistance needs which must be addressed to make such a program practical.

  6. Chromosome-Centric Human Proteome Project Allies with Developmental Biology: A Case Study of the Role of Y Chromosome Genes in Organ Development.

    Science.gov (United States)

    Meyfour, Anna; Pooyan, Paria; Pahlavan, Sara; Rezaei-Tavirani, Mostafa; Gourabi, Hamid; Baharvand, Hossein; Salekdeh, Ghasem Hosseini

    2017-12-01

    One of the main goals of Chromosome-Centric Human Proteome Project is to identify protein evidence for missing proteins (MPs). Here, we present a case study of the role of Y chromosome genes in organ development and how to overcome the challenges facing MPs identification by employing human pluripotent stem cell differentiation into cells of different organs yielding unprecedented biological insight into adult silenced proteins. Y chromosome is a male-specific sex chromosome which escapes meiotic recombination. From an evolutionary perspective, Y chromosome has preserved 3% of ancestral genes compared to 98% preservation of the X chromosome based on Ohno's law. Male specific region of Y chromosome (MSY) contains genes that contribute to central dogma and govern the expression of various targets throughout the genome. One of the most well-known functions of MSY genes is to decide the male-specific characteristics including sex, testis formation, and spermatogenesis, which are majorly formed by ampliconic gene families. Beyond its role in sex-specific gonad development, MSY genes in coexpression with their X counterparts, as single copy and broadly expressed genes, inhibit haplolethality and play a key role in embryogenesis. The role of X-Y related gene mutations in the development of hereditary syndromes suggests an essential contribution of sex chromosome genes to development. MSY genes, solely and independent of their X counterparts and/or in association with sex hormones, have a considerable impact on organ development. In this Review, we present major recent findings on the contribution of MSY genes to gonad formation, spermatogenesis, and the brain, heart, and kidney development and discuss how Y chromosome proteome project may exploit developmental biology to find missing proteins.

  7. Leadership and Project Success in Development Sector

    Directory of Open Access Journals (Sweden)

    Saghir Ahmed

    2017-10-01

    Full Text Available Aim/purpose - The study aims to investigate the relationship among the leadership, operational efficiency and project success in general and the impact of transformational leadership and operational efficiency on project success in particular. Design/methodology/approach - Mean comparison from descriptive statistics and multiple linear regression from inferential statistics was used to determine the association between variables and further impact of the transformational leadership and operational efficiency on project success in the development sector. The paper presents the results of a survey conducted among 200 employees from the top, middle & lower management levels of various national & international development organizations working in Pakistan like Microfinance Banks and other Rural Support Programs. Statistical Package for Social Sciences (SPSS was used to process data. Findings - The result shows positive association among transformational leadership, operational efficiency and project success. In addition, it was found that transformational leadership and operational efficiency have a positive and statistically significant impact on the project success. It is concluded that both transformational leadership and operational efficiency are vital to achieving the optimum level of success in any project, especially in the development sector. Research implications/limitations - The integral limitation of the study was the respondents because most of the development organizations have their operations in rural areas where access was difficult because of limited time and resources. In addition, such organizations are always reluctant to provide survey feedback. Originality/value/contribution - The paper contribution is in the theoretical and practical knowledge of the project success factors in the development sector which is still a somehow unexplored area. Regulators of the development sector may be benefited from this study.

  8. Estimation development cost, study case: Quality Management System Reactor TRIGA Mark III

    International Nuclear Information System (INIS)

    Antúnez Barbosa, Tereso Antonio; Valdovinos Rosas, Rosa María; Marcial Romero, José Raymundo; Ramos Corchado, Marco Antonio; Edgar Herrera Arriaga

    2016-01-01

    The process of estimating costs in software engineering is not a simple task, it must be addressed carefully to obtain an efficient strategy to solve problems associated with the effort, cost and time of activities that are performed in the development of an information system project. In this context the main goal for both developers and customers is the cost, since developers are worry about the effort pay-load and customers are worry about the product pay-load. However, in other fields the cost of goods depends on the activity or process that is performed, thereby deduce that the main cost of the final product of a development project software project is undoubtedly its size. In this paper a comparative study of common models for estimating costs are developed. These models are used today in order to create a structured analysis to provide the necessary information about cost, time and effort for making decisions in a software development project. Finally the models are applied to a case study, which is a system called Monitorizacion Automatica del Sistema de Gestion de Calidad del Reactor TRIGA Mark III. (author)

  9. The Perceived Impact of the Agile Development and Project Management Method Scrum on Information Systems and Software Development Productivity

    Directory of Open Access Journals (Sweden)

    Karlheinz Kautz

    2014-11-01

    Full Text Available This research contributes to the body of knowledge in information systems development (ISD with an empirical investigation in form of a case study that demonstrates the positive impact of the agile development and project management method Scrum on information systems and software development productivity and it provides a useful operationalization of the concept through seven identified indicators for productivity. Despite the fact that the case unit had challenges with the use of Scrum, the indicators identified the areas where the company had managed to exploit the potential of Scrum and its practices with regard to increasing productivity. The research results are discussed both with regard to the existing Scrum literature as well as to complex adaptive systems (CAS as a foundation for ISD and agile development.

  10. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  11. Software for improving the quality of project management, a case study: international manufacture of electrical equipment

    Science.gov (United States)

    Preradović, D. M.; Mićić, Lj S.; Barz, C.

    2017-05-01

    Production conditions in today’s world require software support at every stage of production and development of new products, for quality assurance and compliance with ISO standards. In addition to ISO standards such as usual metrics of quality, companies today are focused on other optional standards, such as CMMI (Capability Maturity Model Integrated) or prescribing they own standards. However, while there is intensive progress being made in the PM (project management), there is still a significant number of projects, at the global level, that are failures. These have failed to achieve their goals, within budget or timeframe. This paper focuses on checking the role of software tools through the rate of success in projects implemented in the case of internationally manufactured electrical equipment. The results of this research show the level of contribution of the project management software used to manage and develop new products to improve PM processes and PM functions, and how selection of the software tools affects the quality of PM processes and successfully completed projects.

  12. In-house developed methodologies and tools for decommissioning projects

    International Nuclear Information System (INIS)

    Detilleux, Michel; Centner, Baudouin

    2007-01-01

    The paper describes different methodologies and tools developed in-house by Tractebel Engineering to facilitate the engineering works to be carried out especially in the frame of decommissioning projects. Three examples of tools with their corresponding results are presented: - The LLWAA-DECOM code, a software developed for the radiological characterization of contaminated systems and equipment. The code constitutes a specific module of more general software that was originally developed to characterize radioactive waste streams in order to be able to declare the radiological inventory of critical nuclides, in particular difficult-to-measure radionuclides, to the Authorities. In the case of LLWAA-DECOM, deposited activities inside contaminated equipment (piping, tanks, heat exchangers...) and scaling factors between nuclides, at any given time of the decommissioning time schedule, are calculated on the basis of physical characteristics of the systems and of operational parameters of the nuclear power plant. This methodology was applied to assess decommissioning costs of Belgian NPPs, to characterize the primary system of Trino NPP in Italy, to characterize the equipment of miscellaneous circuits of Ignalina NPP and of Kozloduy unit 1 and, to calculate remaining dose rates around equipment in the frame of the preparation of decommissioning activities; - The VISIMODELLER tool, a user friendly CAD interface developed to ease the introduction of lay-out areas in a software named VISIPLAN. VISIPLAN is a 3D dose rate assessment tool for ALARA work planning, developed by the Belgian Nuclear Research Centre SCK.CEN. Both softwares were used for projects such as the steam generators replacements in Belgian NPPs or the preparation of the decommissioning of units 1 and 2 of Kozloduy NPP; - The DBS software, a software developed to manage the different kinds of activities that are part of the general time schedule of a decommissioning project. For each activity, when relevant

  13. Research and development project report for FY 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report summarizes results of research and development projects administered by NEDO for FY 1996. Overview of new energy projects and twelve chapters for individual projects are provided in the report. The new energy technology development projects administered by NEDO are classified into twelve categories, i.e., Development of technologies for solar energy utilization, Development of geothermal resources, Development of technologies for exploration and utilization of geothermal energy, Development of coal energy utilization technologies, Development of coal resources, Development of energy conversion and storage technologies, Development of hydrogen, alcohol and biomass technologies, Development of other oil-alternative energy technologies, Introduction and promotion of new energy sources, International energy-promotion activities, Promotion of development and introduction, and Activities of the NEDO Information Center. To ensure energy security and actively cope with environmental problems such as by taking carbon dioxide emission control measures, NEDO has stepped up its efforts to develop new energy- and energy saving-related technologies and introduce and diffuse them. 79 figs., 37 tabs.

  14. Neighborhood Energy/Economic Development project

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    Energy costs impact low income communities more than anyone else. Low income residents pay a larger percentage of their incomes for energy costs. In addition, they generally have far less discretionary energy use to eliminate in response to increasing energy prices. Furthermore, with less discretionary income, home energy efficiency improvements are often too expensive. Small neighborhood businesses are in the same situation. Improved efficiency in the use of energy can improve this situation by reducing energy costs for residents and local businesses. More importantly, energy management programs can increase the demand for local goods and services and lead to the creation of new job training and employment opportunities. In this way, neighborhood based energy efficiency programs can support community economic development. The present project, undertaken with the support of the Urban Consortium Energy Task Force, was intended to serve as a demonstration of energy/economic programming at the neighborhood level. The San Francisco Neighborhood Energy/Economic Development (NEED) project was designed to be a visible demonstration of bringing the economic development benefits of energy management home to low-income community members who need it most. To begin, a Community Advisory Committee was established to guide the design of the programs to best meet needs of the community. Subsequently three neighborhood energy/economic development programs were developed: The small business energy assistance program; The youth training and weatherization program; and, The energy review of proposed housing development projects.

  15. Exploration of Exploitation Approaches of European Projects on ICT and Foreign Language Learning: the CEFcult project case

    OpenAIRE

    Rusman, Ellen; Rajagopal, Kamakshi; Stoyanov, Slavi; Van Maele, Jan

    2011-01-01

    Rusman, E., Rajagopal, K., Stoyanov, S., & Van Maele, J. (2011, 20-21 October). Exploration of Exploitation Approaches of European Projects on ICT and Foreign Language Learning: the CEFcult project case. Paper presented at the 4th International Conference ICT for Language Learning, Florence, Italy. Available at: http://www.pixel-online.net/ICT4LL2011/conferenceproceedings.php

  16. All projects related to | Page 115 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Topic: POLICE, RESEARCH, POLICY MAKING, ASIA ... Through case studies in Uganda, this project will test dominant international and government ... This project addresses the lack of quantitative and qualitative employment data for ... The coastal area of Cartagena, an important tourist destination in Colombia, is home to ...

  17. Viticulture – Challenge for Tourism Development (Znojmo Case Study Area

    Directory of Open Access Journals (Sweden)

    Miroslav Foret

    2014-01-01

    Full Text Available The article, which deals with the issue whether the viticulture can be the challenge for tourism development, is based on research conducted in Znojmo case study area (the Czech Republic. It starts with general introduction of wine tourism concept based on the selected results of the previous scientific researches. The second part of the article brings description of the methods and brief characterisation of case study area. The third part pays attention to the analyses of the selected statistical data showing importance of viticulture for the case study area. The main fourth part is focused on selected activities which are connected with projects developing wine tourism (especially vineyards and vine festivals, where cooperation of different actors is necessary and continues by analysing of the potential of more intensive development of wine tourism on example of the important actor in case study area – wine producer Znovín Znojmo. The conducted research shows strong local embededness and association of company with the tourism industry. The article concludes with general recommendations, which emphasize the importance of effective partnership of the different actors by successful development of wine tourism.

  18. Incentive Mechanism of Micro-grid Project Development

    Directory of Open Access Journals (Sweden)

    Yong Long

    2018-01-01

    Full Text Available Due to the issue of cost and benefit, the investment demand and consumption demand of micro-grids are insufficient in the early stages, which makes all parties lack motivation to participate in the development of micro-grid projects and leads to the slow development of micro-grids. In order to promote the development of micro-grids, the corresponding incentive mechanism should be designed to motivate the development of micro-grid projects. Therefore, this paper builds a multi-stage incentive model of micro-grid project development involving government, grid corporation, energy supplier, equipment supplier, and the user in order to study the incentive problems of micro-grid project development. Through the solution and analysis of the model, this paper deduces the optimal subsidy of government and the optimal cooperation incentive of the energy supplier, and calculates the optimal pricing strategy of grid corporation and the energy supplier, and analyzes the influence of relevant factors on optimal subsidy and incentive. The study reveals that the cost and social benefit of micro-grid development have a positive impact on micro-grid subsidy, technical level and equipment quality of equipment supplier as well as the fact that government subsidies positively adjust the level of cooperation incentives and price incentives. In the end, the validity of the model is verified by numerical analysis, and the incentive strategy of each participant is analyzed. The research of this paper is of great significance to encourage project development of micro-grids and to promote the sustainable development of micro-grids.

  19. Incentive contracts for development projects

    Science.gov (United States)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  20. Are Project Developers Knights and Researchers Queens?

    DEFF Research Database (Denmark)

    Vinstrup, Anya Bjørn

    2014-01-01

    How do project developers at universities view their customers – the researchers, and how do they see themselves as a profession? Does this view influence their motivation and what challenges does it impose? Taking elements of theory from Public Service Motivation (PSM) and linking it with a small...... empirically based survey among the project developers at a centrally located office at a university in Denmark – these questions are sought to be answered. The focal point being the motivation of the project developer, with special emphasis on their user perception, and the practical implications it has...... for leadership and organisational structures....

  1. Development of generic key performance indicators for PMBOK® using a 3D project integration model

    Directory of Open Access Journals (Sweden)

    Craig Langston

    2013-12-01

    Full Text Available Since Martin Barnes’ so-called ‘iron triangle’ circa 1969, much debate has occurred over how best to describe the fundamental constraints that underpin project success. This paper develops a 3D project integration model for PMBOK® comprising core constraints of scope, cost, time and risk as a basis to propose six generic key performance indicators (KPIs that articulate successful project delivery. These KPIs are defined as value, efficiency, speed, innovation, complexity and impact and can each be measured objectively as ratios of the core constraints. An overall KPI (denoted as s3/ctr is also derived. The aim in this paper is to set out the case for such a model and to demonstrate how it can be employed to assess the performance of project teams in delivering successful outcomes at various stages in the project life cycle. As part of the model’s development, a new PMBOK® knowledge area concerning environmental management is advanced.

  2. Android arcade game app a real world project : case study approach

    CERN Document Server

    DiMarzio, Jerome

    2012-01-01

    Apress, the leading Android books publisher, continues to provide you with very hands-on, practical books for teaching and showing app developers how to build and design apps, including game apps, that can be built and deployed in the various Android app stores out there. Android Arcade Game App:  A Real World Project - Case Study Approach is no different in that it walks you through creating an arcade style Prison Break game app-top to bottom-for an Android smartphone or tablet.  This book teaches you the unique characteristics and challenges of creating an Arcade style game And it provides y

  3. The developing human connectome project: A minimal processing pipeline for neonatal cortical surface reconstruction.

    Science.gov (United States)

    Makropoulos, Antonios; Robinson, Emma C; Schuh, Andreas; Wright, Robert; Fitzgibbon, Sean; Bozek, Jelena; Counsell, Serena J; Steinweg, Johannes; Vecchiato, Katy; Passerat-Palmbach, Jonathan; Lenz, Gregor; Mortari, Filippo; Tenev, Tencho; Duff, Eugene P; Bastiani, Matteo; Cordero-Grande, Lucilio; Hughes, Emer; Tusor, Nora; Tournier, Jacques-Donald; Hutter, Jana; Price, Anthony N; Teixeira, Rui Pedro A G; Murgasova, Maria; Victor, Suresh; Kelly, Christopher; Rutherford, Mary A; Smith, Stephen M; Edwards, A David; Hajnal, Joseph V; Jenkinson, Mark; Rueckert, Daniel

    2018-06-01

    The Developing Human Connectome Project (dHCP) seeks to create the first 4-dimensional connectome of early life. Understanding this connectome in detail may provide insights into normal as well as abnormal patterns of brain development. Following established best practices adopted by the WU-MINN Human Connectome Project (HCP), and pioneered by FreeSurfer, the project utilises cortical surface-based processing pipelines. In this paper, we propose a fully automated processing pipeline for the structural Magnetic Resonance Imaging (MRI) of the developing neonatal brain. This proposed pipeline consists of a refined framework for cortical and sub-cortical volume segmentation, cortical surface extraction, and cortical surface inflation, which has been specifically designed to address considerable differences between adult and neonatal brains, as imaged using MRI. Using the proposed pipeline our results demonstrate that images collected from 465 subjects ranging from 28 to 45 weeks post-menstrual age (PMA) can be processed fully automatically; generating cortical surface models that are topologically correct, and correspond well with manual evaluations of tissue boundaries in 85% of cases. Results improve on state-of-the-art neonatal tissue segmentation models and significant errors were found in only 2% of cases, where these corresponded to subjects with high motion. Downstream, these surfaces will enhance comparisons of functional and diffusion MRI datasets, supporting the modelling of emerging patterns of brain connectivity. Copyright © 2018 Elsevier Inc. All rights reserved.

  4. Product development projects dynamics and emergent complexity

    CERN Document Server

    Schlick, Christopher

    2016-01-01

    This book primarily explores two topics: the representation of simultaneous, cooperative work processes in product development projects with the help of statistical models, and the assessment of their emergent complexity using a metric from theoretical physics (Effective Measure Complexity, EMC). It is intended to promote more effective management of development projects by shifting the focus from the structural complexity of the product being developed to the dynamic complexity of the development processes involved. The book is divided into four main parts, the first of which provides an introduction to vector autoregression models, periodic vector autoregression models and linear dynamical systems for modeling cooperative work in product development projects. The second part presents theoretical approaches for assessing complexity in the product development environment, while the third highlights and explains closed-form solutions for the complexity metric EMC for vector autoregression models and linear dyn...

  5. Implementing change: lessons from five development projects

    DEFF Research Database (Denmark)

    Riis, J. O.; Hildebrandt, S.; Andreasen, Mogens Myrup

    2001-01-01

    The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... with organizational changes. Thirdly, four paradoxes for managing development projects are presented; they may serve as guidelines for coping with the complexity and uncertainty of change processes......The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... in the change process, the role of a vision of the future company; and organizational learning processes taking place during the development project. Secondly, different interpretation models will be employed in an effort to broaden the understanding of the many facets and viewpoints associated...

  6. Brokerage by a Project Manager across a New Product Development Project

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Jepsen, Anna Lund; Dietrich, Perttu

    2012-01-01

    between three subtypes of brokerage: Brokerage connecting actors from the project team with actors from the various departments within the same organization (intra-organizational brokerage), brokerage connecting employees at the NPD organization with someone working in another organization (inter...... as a hub between possible suppliers for the project. We had also expected that the PM would be more involved in coordination of, to and from the project team than what we found in this study. Based on the study, it seems that some of the connections that we, based on existing knowledge, would expect...... that the management of the project in terms of linking the stakeholders takes off in the solution development phase rather than in the concept development phase which is the phase in focus in large parts of the research that has taken place in this field. Further, contrary to expectations based on existing knowledge...

  7. Projected oriented organizations as development of enterprise management methods

    Directory of Open Access Journals (Sweden)

    S.I. Pavlova

    2016-12-01

    Full Text Available Dynamic external environment, significant shortage of product life cycle, increase of product technological difficulty, extension of innovative knowledge motivates managers to look for and use in their activities keys that will provide constant, stable development of organizational structures. The methodology of project enterprise management meets the requirements of «preservation through development». The articles researches the integration of methods and procedures of project management into the enterprise management system. Project management philosophy is the efficient way of existence in the competitive environment and the means for internal development of a company. The author conducts an analysis, determines the essence and peculiarities of a project-oriented enterprise, performs comparing characteristics of functional and project management, describes the stages of gradual transformation of an enterprise organizational structure into a project-oriented one. It is defined that a project-oriented enterprise is that one which functions on the base of innovative development and are scientific, creative and widely use the project activity as the means of a steady development. The article describes internal and external instruments of project management, base knowledge systems on project management and possibilities of enterprises on audit of state of system project management in an enterprise according to the IPMA certification program on the territory of Ukraine.

  8. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  9. Clean development mechanism projects and portfolio risks

    International Nuclear Information System (INIS)

    Matsuhashi, Ryuji; Fujisawa, Sei; Mitamura, Wataru; Momobayashi, Yutaka; Yoshida, Yoshikuni

    2004-01-01

    Clean development mechanism (CDM) is expected to facilitate technology transfer from developed to developing countries as well as to economically reduce greenhouse gas emissions. In this article, we explore effective institutions to activate CDM projects. For this purpose, we have estimated internal rate of return (IRR) and other indicators on profitability for 42 CDM or JI projects, taking account of volatilities in the price of certified emission reductions (CER). As a result of Monte Carlo simulations, expected values and standard deviations in the IRR of the projects were quantitatively shown. Then we evaluated various risks in CDM, concluding that diversification of investment is an effective way to suppress these risks. Therefore securitization of CDM finance is proposed as a means of facilitating the diversification of investment. Namely, we present the concept of a CDM bond, which is a project bond with CER. We also investigated the role of governments to suppress risks in CDM. Referring to CERUPT, initiated by the Netherlands' government, the institution of 'insured CERUPT' is proposed to suppress downside risks in the IRR of the projects. We concluded that it is possible to make CDM projects viable by the 'insured CERUPT' and CDM bond

  10. School Autonomy: perspectives and practices in the development of political projects

    Directory of Open Access Journals (Sweden)

    Nora Gluz

    2008-03-01

    Full Text Available State programs promoting school autonomy have been developed within the neo-liberal project and its state reform policies characterized by decentralization and privatization of social services. These programs were fostered as strategies to improve educational quality and equity, in the midst of the redefinition of the role of the state as guarantor of education as a social right. Disputing the neo-liberal view which led to the dismantlement of the welfare state, social movements arising from marginal sectors of society have implemented their own education projects, often working in collaboration with academia. In these projects, school autonomy is seen as a strategy to challenge existing social relations. In this paper, we compare and contrast the meanings attached to the notion of “school autonomy” and the characteristics of the social practices fostered by the educational programs promoted by two different agents, i.e. the state and social movements. Thus, we analyze in the case of Argentina a nation-wide program implemented by the National Ministry of Education (Programa Nueva Escuela Argentina para el Siglo XXI as well as an educational program developed by a social movement (the Movimiento Nacional de Empresas Recuperadas.

  11. A Scorpion¡¯s Poison Antivenin R&D+i Project Case from a Mexican Public University.

    OpenAIRE

    Vega-Gonz¨¢lez Luis Roberto

    2012-01-01

    All over the world there is a huge complex problem caused by the sting of poisonous animals. In many countries all around the orb there are some animal species hazardous for human beings. A case from a Mexican University R&D institute- Private firm innovation project about scorpion¡¯s antivenins health area is presented. The scientific-technological allied participant organizations performed a long life cycle innovation project, which includes research and development, knowledge transference,...

  12. The research project KLIMAT. Report of carrot case study; Forskningsprosjektet KLIMAT. Rapport fra gulrot case studie

    Energy Technology Data Exchange (ETDEWEB)

    Svanes, Erik

    2012-07-01

    The research project 'KLIMAT' was 1.1.2009 to 31.8.2012. The main goal of this project was to develop a 'best practice' methodology for quantifying the carbon footprint of products with a focus on fruits, vegetables, dairy and meat products. The methodology was tested on six selected case products. One of these products was the carrot. The product was selected because it is a product with high sales volume, a large part of the production takes place in Norway, and it may be assumed to represent the root vegetables which are a very important group of vegetable products. Oestfold Research, in conjunction with BAMA and Gartnerhallen, collected the necessary data to conduct the study. Data came from a group of 13 producers with ties to Laagendalen that all products supplied to the Laagen Gulrot for processing and packing. The producers were voluntarily affiliated with an online reporting system for a variety of information, including information about resource use that were used in this study. Climate track of carrot packed in the cup was, according to the methodology that was developed 0.39 kg Co2-ekv/kg product delivered to the consumer, 0.44 kg Co2-ekv/kg consumed carrot. (Author)

  13. NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

    Science.gov (United States)

    Reid, Concha M.; Miller, Thomas B.; Mercer, Carolyn R.; Jankovsky, Amy L.

    2010-01-01

    Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

  14. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  15. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  16. Final report to the Atomic Energy Control Board on project management capabilities using NAOP as a case study

    International Nuclear Information System (INIS)

    Masters, P.

    1998-01-01

    The purpose of this report is to identify practices of the Atomic Energy Control Board that support or detract from the implementation of collaborative cross-functional project management and to recommend ways and means of increasing the Board's ability to respond to projects. Ontario Hydro's Nuclear Asset Optimization Program (NAOP) and the Board's response to that program form the basis of a case study for the purposes of this report. Issues examined include: Whether the Board follows a logical project management framework when it addresses projects such as the NAOP; where the Board exhibits good practices in addressing project such as the NAOP; and where the Board needs to develop better practices

  17. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorus uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery levels which assure the project viability technicaly and economicaly. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  18. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorous uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery leves which assure the project viability technically and economically. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  19. Supervision and Performance : The Case of World Bank Projects

    NARCIS (Netherlands)

    Kilby, C.

    1995-01-01

    This paper explores empirical aspects of the relation between supervision and project performance. I focus on development projects funded by the World Bank and on supervision done by the World Bank. The World Bank is the preeminent international development organization both in terms of money lent

  20. Redox processes in the safety case of deep geological repositories of radioactive wastes. Contribution of the European RECOSY Collaborative Project

    International Nuclear Information System (INIS)

    Duro, L.; Bruno, J.; Grivé, M.; Montoya, V.; Kienzler, B.; Altmaier, M.; Buckau, G.

    2014-01-01

    Highlights: • The RECOSY project produced results relevant for the Safety Case of nuclear disposal. • We classify the safety related features where RECOSY has contributed. • Redox processes effect the retention of radionuclides in all repository subsystems. - Abstract: Redox processes influence key geochemical characteristics controlling radionuclide behaviour in the near and far field of a nuclear waste repository. A sound understanding of redox related processes is therefore of high importance for developing a Safety Case, the collection of scientific, technical, administrative and managerial arguments and evidence in support of the safety of a disposal facility. This manuscript presents the contribution of the specific research on redox processes achieved within the EURATOM Collaborative Project RECOSY (REdox phenomena COntrolling SYstems) to the Safety Case of nuclear waste disposal facilities. Main objectives of RECOSY were related to the improved understanding of redox phenomena controlling the long-term release or retention of radionuclides in nuclear waste disposal and providing tools to apply the results to Performance Assessment and the Safety Case. The research developed during the project covered aspects of the near-field and the far-field aspects of the repository, including studies relevant for the rock formations considered in Europe as suitable for hosting an underground repository for radioactive wastes. It is the intention of this paper to highlight in which way the results obtained from RECOSY can feed the scientific process understanding needed for the stepwise development of the Safety Case associated with deep geological disposal of radioactive wastes

  1. Criteria for Developing a Successful Privatization Project

    Science.gov (United States)

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  2. Factors of the uneven regional development of wind energy projects (a case of the Czech Republic)

    Czech Academy of Sciences Publication Activity Database

    Frantál, Bohumil; Kunc, Josef

    2010-01-01

    Roč. 62, č. 3 (2010), s. 183-199 ISSN 0016-7193 R&D Projects: GA AV ČR(CZ) KJB700860801 Institutional research plan: CEZ:AV0Z30860518 Keywords : wind energy * diffusion of innovation * social acceptance * uneven development Subject RIV: DE - Earth Magnetism, Geodesy, Geography

  3. A method to study the management of urban development projects

    NARCIS (Netherlands)

    Heurkens, E.

    2011-01-01

    The management of urban development projects in the Netherlands has changed significantly in recent years. These projects have become mainly ‘led’ by developers as they manage the entire life cycle of development projects, while public actors mainly facilitate development projects. This changes the

  4. Estimation and Control in Agile Methods for Software Development: a Case Study

    Directory of Open Access Journals (Sweden)

    Mitre-Hernández Hugo A.

    2014-07-01

    Full Text Available The development of software (SW using agile methods is growing due to the productivity associated with these methodologies, in addition to the flexibility shown in small teams. However, these methods have clear weaknesses of software development in cost estimation and management, as well as the fact that project managers do not have enough evidence to verify the budget spending on a project due to the poor documentation generated and the lack of monitoring of resource spending. A proposal estimation and cost control in agile methods to solve these shortcomings. To this end, a case study was conducted in an agile software development company using the proposal for Software as a Service (SaaS and Web application projects. The results found were that the proposal generates a high degree of evidence for project managers, but it has shortcomings in the administration of the evidence for the control and decision making, which led to a definition of a decision making process to be coupled with the measurement proposal.

  5. Software use cases to elicit the software requirements analysis within the ASTRI project

    Science.gov (United States)

    Conforti, Vito; Antolini, Elisa; Bonnoli, Giacomo; Bruno, Pietro; Bulgarelli, Andrea; Capalbi, Milvia; Fioretti, Valentina; Fugazza, Dino; Gardiol, Daniele; Grillo, Alessandro; Leto, Giuseppe; Lombardi, Saverio; Lucarelli, Fabrizio; Maccarone, Maria Concetta; Malaguti, Giuseppe; Pareschi, Giovanni; Russo, Federico; Sangiorgi, Pierluca; Schwarz, Joseph; Scuderi, Salvatore; Tanci, Claudio; Tosti, Gino; Trifoglio, Massimo; Vercellone, Stefano; Zanmar Sanchez, Ricardo

    2016-07-01

    The Italian National Institute for Astrophysics (INAF) is leading the Astrofisica con Specchi a Tecnologia Replicante Italiana (ASTRI) project whose main purpose is the realization of small size telescopes (SST) for the Cherenkov Telescope Array (CTA). The first goal of the ASTRI project has been the development and operation of an innovative end-to-end telescope prototype using a dual-mirror optical configuration (SST-2M) equipped with a camera based on silicon photo-multipliers and very fast read-out electronics. The ASTRI SST-2M prototype has been installed in Italy at the INAF "M.G. Fracastoro" Astronomical Station located at Serra La Nave, on Mount Etna, Sicily. This prototype will be used to test several mechanical, optical, control hardware and software solutions which will be used in the ASTRI mini-array, comprising nine telescopes proposed to be placed at the CTA southern site. The ASTRI mini-array is a collaborative and international effort led by INAF and carried out by Italy, Brazil and South-Africa. We present here the use cases, through UML (Unified Modeling Language) diagrams and text details, that describe the functional requirements of the software that will manage the ASTRI SST-2M prototype, and the lessons learned thanks to these activities. We intend to adopt the same approach for the Mini Array Software System that will manage the ASTRI miniarray operations. Use cases are of importance for the whole software life cycle; in particular they provide valuable support to the validation and verification activities. Following the iterative development approach, which breaks down the software development into smaller chunks, we have analysed the requirements, developed, and then tested the code in repeated cycles. The use case technique allowed us to formalize the problem through user stories that describe how the user procedurally interacts with the software system. Through the use cases we improved the communication among team members, fostered

  6. PURPA Resource Development in the Pacific Northwest : Case Studies of Ten Electricity Generating Powerplants.

    Energy Technology Data Exchange (ETDEWEB)

    Washington State Energy Office.

    1990-07-01

    The case studies in this document describe the Public Utilities, Regulatory Policies Act (PURPA) development process for a variety of generating technologies. Developer interactions with regulatory agencies and power purchasers are described in some detail. Equipment, installation, and maintenance costs are identified; power marketing considerations are taken into account; and potential environmental impacts, with corresponding mitigation approaches and practices are summarized. The project development case studies were prepared by the energy agencies of the four Northwest states, under contract to the Bonneville Power Administration.

  7. Generic project definitions for improvement of health care delivery: a case-based approach.

    Science.gov (United States)

    Niemeijer, Gerard C; Does, Ronald J M M; de Mast, Jeroen; Trip, Albert; van den Heuvel, Jaap

    2011-01-01

    The purpose of this article is to create actionable knowledge, making the definition of process improvement projects in health care delivery more effective. This study is a retrospective analysis of process improvement projects in hospitals, facilitating a case-based reasoning approach to project definition. Data sources were project documentation and hospital-performance statistics of 271 Lean Six Sigma health care projects from 2002 to 2009 of general, teaching, and academic hospitals in the Netherlands and Belgium. Objectives and operational definitions of improvement projects in the sample, analyzed and structured in a uniform format and terminology. Extraction of reusable elements of earlier project definitions, presented in the form of 9 templates called generic project definitions. These templates function as exemplars for future process improvement projects, making the selection, definition, and operationalization of similar projects more efficient. Each template includes an explicated rationale, an operationalization in the form of metrics, and a prototypical example. Thus, a process of incremental and sustained learning based on case-based reasoning is facilitated. The quality of project definitions is a crucial success factor in pursuits to improve health care delivery. We offer 9 tried and tested improvement themes related to patient safety, patient satisfaction, and business-economic performance of hospitals.

  8. Optimal sampling plan for clean development mechanism energy efficiency lighting projects

    International Nuclear Information System (INIS)

    Ye, Xianming; Xia, Xiaohua; Zhang, Jiangfeng

    2013-01-01

    Highlights: • A metering cost minimisation model is built to assist the sampling plan for CDM projects. • The model minimises the total metering cost by the determination of optimal sample size. • The required 90/10 criterion sampling accuracy is maintained. • The proposed metering cost minimisation model is applicable to other CDM projects as well. - Abstract: Clean development mechanism (CDM) project developers are always interested in achieving required measurement accuracies with the least metering cost. In this paper, a metering cost minimisation model is proposed for the sampling plan of a specific CDM energy efficiency lighting project. The problem arises from the particular CDM sampling requirement of 90% confidence and 10% precision for the small-scale CDM energy efficiency projects, which is known as the 90/10 criterion. The 90/10 criterion can be met through solving the metering cost minimisation problem. All the lights in the project are classified into different groups according to uncertainties of the lighting energy consumption, which are characterised by their statistical coefficient of variance (CV). Samples from each group are randomly selected to install power meters. These meters include less expensive ones with less functionality and more expensive ones with greater functionality. The metering cost minimisation model will minimise the total metering cost through the determination of the optimal sample size at each group. The 90/10 criterion is formulated as constraints to the metering cost objective. The optimal solution to the minimisation problem will therefore minimise the metering cost whilst meeting the 90/10 criterion, and this is verified by a case study. Relationships between the optimal metering cost and the population sizes of the groups, CV values and the meter equipment cost are further explored in three simulations. The metering cost minimisation model proposed for lighting systems is applicable to other CDM projects as

  9. Workforce development and effective evaluation of projects.

    Science.gov (United States)

    Dickerson, Claire; Green, Tess; Blass, Eddie

    The success of a project or programme is typically determined in relation to outputs. However, there is a commitment among UK public services to spending public funds efficiently and on activities that provide the greatest benefit to society. Skills for Health recognised the need for a tool to manage the complex process of evaluating project benefits. An integrated evaluation framework was developed to help practitioners identify, describe, measure and evaluate the benefits of workforce development projects. Practitioners tested the framework on projects within three NHS trusts and provided valuable feedback to support its development. The prospective approach taken to identify benefits and collect baseline data to support evaluation was positively received and the clarity and completeness of the framework, as well as the relevance of the questions, were commended. Users reported that the framework was difficult to complete; an online version could be developed, which might help to improve usability. Effective implementation of this approach will depend on the quality and usability of the framework, the willingness of organisations to implement it, and the presence or establishment of an effective change management culture.

  10. Project Stakeholder Management: A Case Study of a Brazilian Science Park

    Directory of Open Access Journals (Sweden)

    Antônio Carlos Pacagnella Júnior

    2015-07-01

    Full Text Available The stakeholder management has been a topic increasingly discussed in the literature about project management, though still existing, large gaps to be filled, especially in complex projects such as the implementation of science parks. Thus, in this paper is presented a case of a Brazilian Science Park which shows how the management team of the project identified key stakeholders and established strategies for engagement and collaboration that sought to increase their engagement, get resources and make use of specific capabilities that were required during the lifecycle of the project to the reaching of its goals.

  11. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  12. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  13. Minerals and energy: major development projects - April 2005 listing

    Energy Technology Data Exchange (ETDEWEB)

    Ian Haine (and others) [Australian Bureau of Agricultural and Resource Economics (ABARE), Canberra, ACT (Australia)

    2005-06-01

    The article describes trends in project development and investment in the minerals and energy sector in Australia. It lists competed projects and committed projects. Black coal projects completed during November 2004 to April 2005 were: Dendrobium underground and Mandalong longwall mining expansion projects in New South Wales and development of Curragh North and Eaglefield opencut mine in Queensland. One of the more significant newly listed projects is Macarthur Coal's Queensland Coke Project near Rockhampton. Capital cost and values of projects are included. The full listing of 229 projects is available electronically from ABARE. The list is released around May and November each year. 10 figs., 4 tabs.

  14. Management of Software Development Projects

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2011-04-01

    Full Text Available Any major software development starts with the Initiating process group. Once the charter document is approved, the Planning and then to the Executing stages will follow. Monitoring and Controlling is measuring the potential performance deviation of the project in terms of schedule and costs and performs the related Integrated Change Control activities. At the end, during the Closing, the program/project manager will check the entire work is completed and the objectives are met.

  15. Large-Scale Participation: A Case Study of a Participatory Approach to Developing a New Public Library

    DEFF Research Database (Denmark)

    Dalsgaard, Peter; Eriksson, Eva

    2013-01-01

    In this paper, we present a case study of a participatory project that focuses on interaction in large-scale design, namely, the development of the new Urban Mediaspace Aarhus. This project, which has been under way for ten years, embodies a series of issues that arise when participatory design...

  16. Developing Novel Reservoir Rule Curves Using Seasonal Inflow Projections

    Science.gov (United States)

    Tseng, Hsin-yi; Tung, Ching-pin

    2015-04-01

    Due to significant seasonal rainfall variations, reservoirs and their flexible operational rules are indispensable to Taiwan. Furthermore, with the intensifying impacts of climate change on extreme climate, the frequency of droughts in Taiwan has been increasing in recent years. Drought is a creeping phenomenon, the slow onset character of drought makes it difficult to detect at an early stage, and causes delays on making the best decision of allocating water. For these reasons, novel reservoir rule curves using projected seasonal streamflow are proposed in this study, which can potentially reduce the adverse effects of drought. This study dedicated establishing new rule curves which consider both current available storage and anticipated monthly inflows with leading time of two months to reduce the risk of water shortage. The monthly inflows are projected based on the seasonal climate forecasts from Central Weather Bureau (CWB), which a weather generation model is used to produce daily weather data for the hydrological component of the GWLF. To incorporate future monthly inflow projections into rule curves, this study designs a decision flow index which is a linear combination of current available storage and inflow projections with leading time of 2 months. By optimizing linear relationship coefficients of decision flow index, the shape of rule curves and the percent of water supply in each zone, the best rule curves to decrease water shortage risk and impacts can be developed. The Shimen Reservoir in the northern Taiwan is used as a case study to demonstrate the proposed method. Existing rule curves (M5 curves) of Shimen Reservoir are compared with two cases of new rule curves, including hindcast simulations and historic seasonal forecasts. The results show new rule curves can decrease the total water shortage ratio, and in addition, it can also allocate shortage amount to preceding months to avoid extreme shortage events. Even though some uncertainties in

  17. Incorporating Gaming in Software Engineering Projects: Case of RMU Monopoly

    Directory of Open Access Journals (Sweden)

    Sushil Acharya

    2009-02-01

    Full Text Available A major challenge in engineering education is retaining student interest in the engineering discipline. Active student involvement in engineering projects is one way of retaining student interest. Such involvement can only be realized if project inception comes entirely from the student. This paper presents a software game, RMU Monopoly, developed as a project requirement for a software engineering course and describes the challenges and gains of implementing such a project. The RMU Monopoly was proposed by three junior software engineering students. The game is a multi-platform software program that allows up to eight players and implements the rules of the Monopoly board game. To ensure agility the game was developed using the spiral software development model. The Software Requirements Specification (SRS document was finalized through an iterative procedure. Standard Unified Modeling Language (UML diagrams were used for product design. A Risk Mitigation, Monitoring, and Management Plan (RMMM was developed to ensure proactive risk management. Gantt chart, weekly progress meetings and weekly scrum meetings were used to track project progress. C# and Sub- Version were used in a client-server architecture to develop the software. The project was successful in retaining student interest in the software engineering discipline

  18. An empirical study on key factors for purchasing strategy on project based organizations: A case study of gas field development projects

    Directory of Open Access Journals (Sweden)

    Aboulfazl Kazazi

    2012-08-01

    Full Text Available One of the primary concerns in development of oil and gas resources is to find the critical success factors associated with different important projects. Purchasing and procurement plays a key role in these projects. There is no doubt that in history of similar studies, there are not much studies to determine key factors. The proposed study of this paper presents an empirical study to find these factors in one of the most important gas filed in Iran is now South Pars Gas Field. The study distributes a questionnaire consists of various questions associated with purchasing activities. We investigate the feedbacks gathered from decision makers using factor analysis. The results of our survey reveal that there are three categories of organizational strategy, the relative importance of strategy and risk according to factor analysis. Each factor consists of many other factors and the relative importance of all factors are investigated.

  19. Integrating HCI Specialists into Open Source Software Development Projects

    Science.gov (United States)

    Hedberg, Henrik; Iivari, Netta

    Typical open source software (OSS) development projects are organized around technically talented developers, whose communication is based on technical aspects and source code. Decision-making power is gained through proven competence and activity in the project, and non-technical end-user opinions are too many times neglected. In addition, also human-computer interaction (HCI) specialists have encountered difficulties in trying to participate in OSS projects, because there seems to be no clear authority and responsibility for them. In this paper, based on HCI and OSS literature, we introduce an extended OSS development project organization model that adds a new level of communication and roles for attending human aspects of software. The proposed model makes the existence of HCI specialists visible in the projects, and promotes interaction between developers and the HCI specialists in the course of a project.

  20. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  1. Economic and Environmental Performances of Small-Scale Rural PV Solar Projects under the Clean Development Mechanism: The Case of Cambodia

    Directory of Open Access Journals (Sweden)

    Ellen De Schepper

    2015-09-01

    Full Text Available The two core objectives of the Clean Development Mechanism (CDM are cost-effective emission reduction and sustainable development. Despite the potential to contribute to both objectives, solar projects play a negligible role under the CDM. In this research, the greenhouse gas mitigation cost is used to evaluate the economic and environmental performances of small-scale rural photovoltaic solar projects. In particular, we compare the use of absolute and relative mitigation costs to evaluate the attractiveness of these projects under the CDM. We encourage the use of relative mitigation costs, implying consideration of baseline costs that render the projects profitable. Results of the mitigation cost analysis are dependent on the baseline chosen. To overcome this drawback, we complement the analysis with a multi-objective optimization approach, which allows quantifying the trade-off between economic and environmental performances of the optimal technologies without requiring a baseline.

  2. Aurora Borealis. Project Cycle Management in Regional Development

    OpenAIRE

    Andra Aldea-Partanen; Heimo Keränen; Susanna Nevalainen

    2003-01-01

    This paper aims to analyse Project Cycle Management approach in the context of regional development. The theoretical framework covers contemporary concepts typical for regional development and specific project/programme management tools. The comparative approach is used to take into account the two versions of Project Cycle Management presented by European Commission among evaluation methods and instruments, in 1993 and 2001. A practical application is drawn using mid-term evaluation of Baren...

  3. New developments in Generator Services project

    International Nuclear Information System (INIS)

    Karneyeu, A; Kirsanov, M; Konstantinov, D; Ryabov, A; Zenin, O; Pokorski, W; Ribon, A

    2011-01-01

    The LOG Generator Services project provides validated, LOG compliant Monte Carlo generators code for both the theoretical and experimental communities at the LHC. In this paper we present the recent developments and the future plans of the project. We report on the current status of the generators repository, the new Autotools-based build system, as well as the new installation tools to create mirrors of the repository. We discuss new developments in testing and physics validation procedures in particular the use of HepMC Analysis Tool, as well as the Rivet validation tool. We also present a new activity, enlarging the scope of the Generator Services project, it is the involvement in the tuning of the Monte Carlo generators. This work, being essential for the understanding of the future LHC data, is now starting with the involvement of all the LHC experiments.

  4. The Special Place Project: Efficacy of a Place-Based Case Study Approach for Teaching Geoscience

    Science.gov (United States)

    Moosavi, Sadredin

    2014-05-01

    Achieving geoscience literacy of the general population has become increasingly important world wide as ever more connected and growing societies depend more and more on our planet's limited natural resource base. Building citizen understanding of their dependence on the local environment, and the geologic processes which created and continue to change it, has become a great challenge to educators at all levels of the education system. The Special Place Project described in this presentation explores use of a place-based case study approach combining instruction in geoscience content with development of observation, reasoning, writing and presentation skills. The approach allows students to select the locations for their individual case studies affording development of personal connections between the learner and his environment. The approach gives instructors at many grade levels the ability to develop core pedagogical content and skills while exploring the unique geologic environments relevant to the local population including such critical issues as land use, resource depletion, energy, climate change and the future of communities in a changing world. The geologic reasons for the location of communities and key events in their histories can be incorporated into the students' case studies as appropriate. The project is unique in placing all course instruction in the context of the quest to explore and gain understanding of the student's chosen location by using the inherently more generalized course content required by the curriculum. By modeling how scientists approach their research questions, this pedagogical technique not only integrates knowledge and skills from across the curriculum, it captures the excitement of scientific thinking on real world questions directly relevant to students' lives, increasing student engagement and depth of learning as demonstrated in the case study reports crafted by the students and exam results. Student learning of topics

  5. Managing IT Projects in Public Companies: A Case Study

    Directory of Open Access Journals (Sweden)

    Bouras, A.

    2014-07-01

    Full Text Available As part of its public sector modernization effort, a North African government has put a lot of effort and allocated significant budgets since 1997 to modernize one of its main public sector companies. Consequently, this company, that mainly offers postal services, initiated many IT-based projects to computerize all paper-based ongoing services offered through its branches and to present new products to customers. This company was aiming to improve service quality and to diversify the range of its services. However, some of these IT-based projects inevitably faced problems. Some projects were either not completed successfully, cancelled, over-budget or taking more time than scheduled. As a result, many employees and customers of this company were dissatisfied and complained about bad planning, slowness and significant disruptions in these projects, an event that affected adversely the quality of service. This study aims at determining the causes of these project disruptions, failures or delays. To achieve this aim, 30 experienced project developers and engineers working in that company’s IT department volunteered to respond to a detailed questionnaire specifically developed for this purpose. The questionnaire included questions about project vision clarity, time/cost management, project quality assurance, risk management and human resources management. Results show that the main reasons for disruptions, failure or delays in IT projects are lack of business plan and poor documentation during and after finishing projects, lack of clear quality assurance criteria, standards and reviews, and poor project risk management practices. Ramifications of such results in terms of improving IT project management practices in the public service sector are finally presented.

  6. Financing of nuclear power projects in developing countries

    International Nuclear Information System (INIS)

    1991-06-01

    This document is a summary of the ''Topical Seminar on Financing of Nuclear Power Projects in Developing Countries, held in Jakarta between 4-7 September, 1990. The seminar presentations were divided into the following sessions: Keynote session (3 papers), Perspective of Nuclear and Fossil-fired Generation Costs (9 papers), Assessment of Problems and Constraints for the Financing of Large Power Projects, with particular Attention to Nuclear Power Projects (9 papers), Mechanisms for Financing Nuclear Power Projects in Developing Countries (11 papers). A separate abstract was prepared for each of these papers. Refs, figs, tabs and charts

  7. Collaborative School Innovation Project as a Pivot for Teachers' Professional Development: The Case of Acharnes' Second Chance School in Greece

    Science.gov (United States)

    Katsarou, Eleni; Tsafos, Vassilis

    2008-01-01

    A collaborative school innovation project is explored as a pivot for the professional development of the teachers involved. The Second Chance School (SCS) of Acharnes in Greece constitutes such a collaborative innovative project, regarding the underlying theory of multiliteracies, its decentralised character, respect for student individuality, and…

  8. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  9. Examining Thai high school students' developing STEM projects

    Science.gov (United States)

    Teenoi, Kultida; Siripun, Kulpatsorn; Yuenyong, Chokchai

    2018-01-01

    Like others, Thailand education strongly focused on STEM education. This paper aimed to examine existing Thai high school students' integrated knowledge about science, technology, engineering, and mathematics (STEM) in their developing science project. The participants included 49 high school students were studying the subject of individual study (IS) in Khon Kaen wittayayon school, Khon Kaen, Thailand. The IS was provided to gradually enhance students to know how to do science project starting from getting start to do science projects, They enrolled to study the individual study of science project for three year in roll. Methodology was qualitative research. Views of students' integrated knowledge about STEM were interpreted through participant observation, interview, and students' science projects. The first author as participant observation has taught this group of students for 3 years. It found that 16 science projects were developed. Views of students' integrated knowledge about STEM could be categorized into three categories. These included (1) completely indicated integration of knowledge about science, technology, engineering, and mathematics, (2) partial indicated integration of knowledge about science, technology, engineering, and mathematics, and (3) no integration. The findings revealed that majority of science projects could be categorized as completely indicated integration of knowledge about science, technology, engineering, and mathematics. The paper suggested some ideas of enhancing students to applying STEM for developing science projects.

  10. Youths Attitude To Rural Development Projects In Ogba ...

    African Journals Online (AJOL)

    ... encourage youths to participate more in rural development projects. Also, training in the form of participatory seminars and workshops would help the youths to be more proactive. Keywords: Youths attitude, rural development projects, Ogba communities, Rivers State, Nigeria Global Approaches to Extension Practice Vol.

  11. A policy for development of project management. Projektijuhtimise arendamise poliitika

    Directory of Open Access Journals (Sweden)

    Arvi Kuura

    2013-01-01

    Full Text Available The share of temporary tasks and activities organised through projects and/or programmes is increasing in modern societies and also in businesses, non-profit and public organisations. To manage an increasing load of projects and programmes, the majority of organisations employ more skilled project management professionals and develop their project management capabilities. Against that background, most governments globally have not paid much attention to the development of project management. In other words, the project management capability (or maturity has not been a macro-level or policy concern. The article explores the importance of project management capabilities and the need for suitable policies, and outlines a policy for the development of project management

  12. Sustainable development benefits of clean development mechanism projects

    International Nuclear Information System (INIS)

    Olsen, Karen Holm; Fenhann, Jorgen

    2008-01-01

    The clean development mechanism (CDM) is part of the global carbon market developing rapidly in response to global warming. It has the twin objective to achieve sustainable development (SD) in host countries and assist Annex-1 countries in achieving their emission reduction targets in a cost-efficient manner. However, research has shown that trade-offs between the two objectives exist in favour of cost-efficient emission reductions and that left to the market forces, the CDM does not significantly contribute to sustainable development. The main argument of the paper is the need for an international standard for sustainability assessment-additional to national definitions-to counter weaknesses in the existing system of sustainability approval by designated national authorities in host countries. The article develops a new methodology, i.e. a taxonomy for sustainability assessment based on text analysis of the 744 project design documents (PDDs) submitted for validation by 3 May 2006. Through analysis of the SD benefits of all CDM projects at aggregated levels, the strengths and limitations of the taxonomy are explored. The main policy implication of the research is to propose the taxonomy as the basis of an international verification protocol for designated operational entities (DOEs) for reporting, monitoring and verifying that potential SD benefits described in the PDDs are actually realized

  13. Optimising Impact in Astronomy for Development Projects

    Science.gov (United States)

    Grant, Eli

    2015-08-01

    Positive outcomes in the fields of science education and international development are notoriously difficult to achieve. Among the challenges facing projects that use astronomy to improve education and socio-economic development is how to optimise project design in order to achieve the greatest possible benefits. Over the past century, medical scientists along with statisticians and economists have progressed an increasingly sophisticated and scientific approach to designing, testing and improving social intervention and public health education strategies. This talk offers a brief review of the history and current state of `intervention science'. A similar framework is then proposed for astronomy outreach and education projects, with applied examples given of how existing evidence can be used to inform project design, predict and estimate cost-effectiveness, minimise the risk of unintended negative consequences and increase the likelihood of target outcomes being achieved.

  14. Hydropower in Hawaii: Developing the Wailuku River project

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    When the 10-MW Wailuku River Hydroelectric Project begins operating this summer, the island of Hawaii will reduce its dependence on oil. The project is illustrative of what must be done to add to the electricity supply and, at the same time, to protect the environment. The Wailuku project is the first hydro plant to be developed in Hawaii in more than 50 years and is the largest hydro facility ever built in the state. The project is being developed by Wailuku River Hydroelectric Power Co., a wholly owned subsidiary of Synergics, Inc. Hawaii Electric Light Company Inc. (HELCO) will buy the electricity generated at the project for 30 years on an as-delivered basis at its avoided cost rate, now approximately 6.71 cents per kilowatt-hour, the floor rate in the contract. The Wailuku endeavor receives rave reviews form the mayor of Hilo, the president of the utility, and local residents. The project demanded a high degree of sensitivity to environmental issues and the uniqueness of the Hawaiian culture and island setting, according to Wayne Rogers, president of Wailuku River Hydro. From the conception of this project, we have worked closely with state and local interests and have been committed to following Hawaii's plans for land use and environmentally responsible energy development

  15. Methodological issues in developing a community forestry greenhouse gas emissions mitigation project in Mancherial forest division of Andhra Pradesh, India

    International Nuclear Information System (INIS)

    Murthy, I.K.; Hegde, G.T.; Sudha, P.; Ravindranath, N.H.

    2006-01-01

    There are several contentious issues related to forestry mitigation projects. The special report of the IPCC and literature published so far have shown that permanence, leakage, baseline establishment, measurement, monitoring, etc., could be addressed satisfactorily using existing scientific methods and accounting rules. To understand the methodological issues of developing community forestry projects, a case study was conducted in Mancherial forest division of Adilabad district in Andhra Pradesh, India. This paper addresses: the setting of project boundaries, baseline selection, establishment of additionality and the calculation of carbon sequestration as a result of the project, prior to project implementation. The steps involved in development of the project and the different methods used for establishing baseline, estimating leakage and transaction cost of developing a community forestry project are presented. The stock is projected to increase by 1480 x 10 3 t C during 2000-2012 over the baseline scenario under the modeling approach and the cost of establishing a baseline and project formulation for a project extending over 32,956 ha is estimated to be US$ 1.25 ha -1 and US$ 4 t C -1

  16. Private and Social Considerations in the Design and Appraisal of Development Projects and Related Agricultural Policies: The Case of Wheat in Zambia

    OpenAIRE

    Snodgrass, M M

    1990-01-01

    National planning for economic development has become an institutionalized process in most lesser developed nations of the world. A national plan is comprised of a set of development projects which individually and collectively are designed to contribute to achieving certain economic and social goals for the nation. Ideally, governments should have .a complementary set of price and trade policies that would enhance the success rate of development projects. It is now common practice to design ...

  17. Case Flow Management net-project – The Practical Value for Civil Justice in the Netherlands

    Directory of Open Access Journals (Sweden)

    Thomas de Weers

    2016-11-01

    Full Text Available The problem of court delays has caused a widespread need for fast and efficient civil procedures that are able to maintain a high standard of quality. The EU-funded research project – ‘CFMnet: Towards European Caseflow Management development network – Identifying, developing and sharing best practices’ – wants to meet this need with a collection of European (CFM practices in a handbook and an online platform. Does the CFMnet-project have an added value for the judiciary in the Netherlands? The Netherlands is currently reforming the judiciary in a major transformation called Quality and Innovation (Kwaliteit en Innovatie. The flexible methodology of this project pre-eminently allows for the inclusion of new ideas. This research shows that the CFMnet-project provides both relevant and irrelevant information for the Netherlands. On the one hand, there are some important practices in the CFMnet handbook that are currently unused in the Netherlands, for instance the centralised management of court experts, real-time case management and certain ICT tools. On the other hand, the Dutch jurisdiction is already familiar with a surprisingly high number of practices that are proposed in the handbook, such as summary proceedings and the division of labour between the court clerk and

  18. Framework for Project Development in the Renewable Energy Sector

    Energy Technology Data Exchange (ETDEWEB)

    Springer, R.

    2013-02-01

    The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

  19. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  20. Mt. Apo geothermal project : a learning experience in sustainable development

    International Nuclear Information System (INIS)

    Ote, Leonardo M.; De Jesus, Agnes C.

    1997-01-01

    The Mt. Apo geothermal project, a critical component of the Philippine energy program met stiff opposition from 1988-1991. Seemingly unresolvable legal, environmental and cultural issues between the government developer, the Philippine National Oil Company-Energy Development Corporation (PNOC-EDC) and various affected sectors delayed the project for two years. The paper discusses the efforts undertaken by the developer to resolve these conflicts through a series of initiatives that transformed the project into a legally, environmentally and socially acceptable project. Lastly, the PNOC-EDC experience has evolved a new set of procedures for the environmental evaluation of development project in the Philippines. (author)

  1. Development and implementation of a residency project advisory board.

    Science.gov (United States)

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  2. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  3. Development of cross border gas transmission projects raise challenging issues. Case studies: The transmed and the Maghreb/Europe pipelines

    International Nuclear Information System (INIS)

    Khene, D.

    1997-01-01

    Development of cross border gas transmission projects raise complex and interdependent issues whose successful resolution require not only technical and management strengths but also a close cooperation between the key players involved in the game. In this paper we shall attempt to explain some of the major issues encountered during the appraisal and construction of long distance gas pipeline schemes. The information used derive essentially from the experience gained during the development of the Trans-mediterranean and the Maghreb/Europe pipelines. Running through the various issues we shall also identify and then discuss a number of factors which contributed to the successful implementation of these two projects. (au)

  4. Views and considerations on ICT-AT competences development within the ENTELIS project: The Case of Cyprus.

    Science.gov (United States)

    Mavrou, Katerina; Meletiou-Mavrotheris, Maria

    2015-01-01

    This submission presents part of the EU funded project ENTELIS (European Network for Technology Enhanced Learning in an Inclusive Society), which aims to address issues of digital divide and digital equity for people with disabilities of all ages, and to increase participation and social inclusion. This paper presents the main activities and outcomes of the research work package of the project (WP3), from one of the partner countries, Cyprus. The aim of the conducted research was to identify the conceptions and beliefs of end-users, trainers, and service/technology providers and professionals, on the multifaceted relation between ICT/ICT-AT (Information Communication Technology - Assistive Technology) and learning of technology. Data collection involved the development and administration of three semi-structured interview protocols, one for each group of participants, in five different European countries. Results have been compiled to develop a State-of-Art Report on ICT and ICT-AT education and learning, highlighting the main trends, as well the main present barriers, emergent and future needs in terms of analysis, acquisition and reinforcing of digital competences bridging the worlds of education and work.

  5. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.

    Science.gov (United States)

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D'Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-06-02

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  6. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project

    Directory of Open Access Journals (Sweden)

    Christos Antonopoulos

    2016-06-01

    Full Text Available In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes, and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  7. Implementing CDM projects. A guidebook to host country legal issues; CDM - Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Curnow, P [Baker and McKenzie, London (United Kingdom); Hodes, G [UNEP Risoe Centre on Energy, Climate and Sustainable Development, DTU, Roskilde (Denmark)

    2009-08-15

    The Clean Development Mechanism (CDM) continues to evolve organically, and many legal issues remain to be addressed in order to maximise its effectiveness. This Guidebook explains through case studies how domestic laws and regulatory frameworks in CDM Host Countries interact with international rules on carbon trading, and how the former can be enhanced to facilitate the implementation and financing of CDM projects. (author)

  8. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  9. A Case Study of Teaching Marketing Research Using Client-Sponsored Projects: Method, Challenges, and Benefits

    Science.gov (United States)

    Bove, Liliana L.; Davies, W. Martin

    2009-01-01

    This case study outlines the use of client-sponsored research projects in a quantitative postgraduate marketing research subject conducted in a 12-week semester in a research-intensive Australian university. The case study attempts to address the dearth of recent literature on client-sponsored research projects in the discipline of marketing.…

  10. Wake models developed during the Wind Shadow project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, S.; Ott, S.; Pena, A.; Berg, J.; Nielsen, M.; Rathmann, O.; Joergensen, H.

    2011-11-15

    The Wind Shadow project has developed and validated improved models for determining the wakes losses, and thereby the array efficiency of very large, closely packed wind farms. The rationale behind the project has been that the existing software has been covering these types of wind farms poorly, both with respect to the densely packed turbines and the large fetches needed to describe the collective shadow effects of one farm to the next. Further the project has developed the necessary software for the use of the models. Guidelines with recommendations for the use of the models are included in the model deliverables. The project has been carried out as a collaborative project between Risoe DTU, DONG, Vattenfall, DNV and VESTAS, and it has been financed by energinet.dk grant no. 10086. (Author)

  11. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  12. A program to develop the domestic natural gas industry in Indonesia: Case history of two World Bank projects

    International Nuclear Information System (INIS)

    Klass, D.L.; Khwaja, S.

    1991-01-01

    Indonesia depends heavily on revenues from the export of LNG and oil, the availability of which appears to be decreasing. It is therefore making a strong effort to accelerate development of a domestic natural gas industry. A high priority has been given to the conversion of power plants and city gas systems, including local industries and commercial facilities, from liquid fuels to natural gas. This will release more oil for export, help to meet the objectives of Repelita V, and provide substantial environmental benefits. The World Bank recently provided loans to the Indonesian Government for two projects that are aimed at substituting natural gas for oil and manufactured gas in domestic markets. One project involves expansion of the gas distribution systems of Indonesia's natural gas utility (PGN) in three cities: Jakarta and Bogor in Java, and Medan in Sumatra. The project also includes training programs for PGN staff and an energy pricing policy study to be carried out by Indonesia's Ministry of Mines and Energy. The second project involves expansion of the supply of natural gas for Surabaya and twelve other towns in its vicinity in East Java, and further expansion of Medan's supply system. Technical assistance will be provided to enhance the skills ofPGN and the Ministry of Mines and Energy, and a Gas Technology Unit similar to the Institute of Gas Technology will be established at Indonesia's Research and Development Center for Oil and Gas (LEMIGAS) in Jakarta. 14 refs., 3 figs., 11 tabs

  13. Organizational analysis of construction projects

    OpenAIRE

    Hughes, Will

    1989-01-01

    This research project is about the analysis of construction project organizations. The work is based on organizational theory and is a development of Linear Responsibility Analysis (LRA). The aim is to assess the extent to which project success is affected by organizational structure. The analysis of four public sector case studies raises several issues. First is the need for a systematic model of describing and analysing construction project environments. A framework has been developed that ...

  14. Financing considerations for international coalbed methane projects - a case history

    International Nuclear Information System (INIS)

    Mize, J.S.

    1990-01-01

    This presentation on financing of international, coalbed methane fueled Cogen projects is intended to provide the reader with some insight into the key steps and issues involved in financing an outside-the-USA project. No claim is made as to whether the strategy employed for the China projects will be suitable for other projects. The presentation is made from the perspective of an entrepreneur seeking a workable financial structure to address the concerns of risk, return, technology transfer to a third world country, and stage-wise development from prefeasibility assessment through complete resource development and gas utilization. The China projects referred to in this paper are not yet fully financed. Final project approvals for financing awaiting a request by the USA group for China to confirm that their 50% funding is available, and that initial funds have been transferred to the USA group's bank account

  15. Dream Team - A pregraduate surgical talent development project

    DEFF Research Database (Denmark)

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  16. Generic project definitions for improvement of health care delivery: A case-base approach

    NARCIS (Netherlands)

    Niemeijer, G.C.; Does, R.J.M.M.; de Mast, J.; Trip, A.; van den Heuvel, J.

    2011-01-01

    Background: The purpose of this article is to create actionable knowledge, making the definition of process improvement projects in health care delivery more effective. Methods: This study is a retrospective analysis of process improvement projects in hospitals, facilitating a case-based reasoning

  17. A program to develop the domestic natural gas industry in Indonesia: Case history of two World Bank projects

    International Nuclear Information System (INIS)

    Klass, D.L.; Khwaja, S.

    1992-01-01

    Indonesia depends heavily on revenues from the export of LNG and oil, the availability of which appears to be decreasing. It is therefore making a strong effort to accelerate development of a domestic natural gas industry. A high priority has been given to the conversion of power plants and city gas systems, including local industries and commercial facilities, from liquid fuels to natural gas. This will release more oil for export, help to meet the objectives of Repelita V, and provide substantial environmental benefits. The World Bank recently provided loans to the Indonesian Government for two projects that are aimed at substituting natural gas for oil and manufactured gas in domestic markets. One project involves expansion of the gas distribution systems of Indonesia's natural gas utility (PGN) in three cities: Jakarta and Bogor in Java, and Medan in Sumatra. Approximately 350 new industrial, 800 new commercial, and 12,700 new residential natural gas customers are expected from this project. Incremental gas sales are projected to be about 48.1 million CF/d when the project is completed in 1992. The project also includes training programs for PGN staff and an energy pricing policy study to be carried out by Indonesia's Ministry of Mines and Energy. The second project involves expansion of the supply of natural gas for Surabaya and twelve other towns in its vicinity in East Java, and further expansion of Medan's supply system. The gas for Surabaya will be used for about 400 industrial and 150 commercial customers, and 3,600 households. The additional gas supply for Medan will be used for two power plants operated by the state electric utility, PLN. Incremental natural gas sales from this project are projected to be 68 million CF/d when it is

  18. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  19. US heat pump research and development projects, 1976-1986

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, K.H.

    1987-04-01

    This document, which is an updated version of US Heat Pump Research and Development Projects, published in August 1982 by the US Department of Energy, is a compilation of one-page summaries and publication and patent information for 233 individual research and development projects on heat pumps covering the years 1976 through 1986. The majority of the projects refer to heat pumps in space-conditioning applications. The document is intended to include information on all projects in the United States for which results are publicly available. Ten different indexes are included to aid the reader in locating specific projects.

  20. Bayer CropScience model village project: Contributions to agricultural suppliers’ competitiveness and human development

    Directory of Open Access Journals (Sweden)

    Regina Moczadlo

    2014-12-01

    Full Text Available Bayer CropScience is carrying out a Model Village Project (MVP in rural India as part of their supply chain management and their corporate social responsibility activities. The MVP includes actions related to future business cases and higher competitiveness as well as philanthropic activities. The preparation of future business case actions aims at creating prerequisites for win-win-situations. In the long run, these prerequisites, such as long-term business relations with suppliers based on trust from both sides, can lead to a higher competitiveness of the whole supply chain and simultaneously improve human development. The impacts on the latter are evaluated using the capability approach (CA developed by Amartya Sen (2000, c1999. The case of the MVP indicates the potential of companies to contribute to human development on a strategic win-win basis. Actions have to be distinguished based on the living and financial conditions different supplier groups face. In the future, the MVP aims at assessing whether and how MNCs may be able to combine competitive enhancement with human development, provided that potential corporate risks for the villagers’ human development are also taken into account.

  1. The Role of Real Estate in Sustainable Development in Developing Countries: The Case of the Kingdom of Bahrain

    Directory of Open Access Journals (Sweden)

    Yusra Mouzughi

    2014-04-01

    Full Text Available The construction of real estate has the potential to advance sustainability in terms of meeting economic and social criteria—the Business Case and the Societal Case. This is a crucial aspect in the stated visions and plans in many developing countries. Hence, it is important to understand how real estate can best contribute. Semi-structured interviews with a number of decision-makers involved in the real estate sector in the Kingdom of Bahrain were undertaken to explore perceptions of how the sector could best contribute to sustainable development. The decision-makers came from government bodies, investment banks, real estate developers, investors, constructors, project consultants and auditors. The interviews highlight the importance of having a stated vision and strategy which is highly visible and shared by all stakeholders. In the case of Bahrain this is Vision 2030 and the National Economic Strategy. It is important to ensure that any plans that are put in place to achieve the vision/strategy are adaptable to reflect changes in the external environment. The decision-makers identified three areas of focus in terms of the content of policy in order to meet the economic and social-related sustainability criteria as set out in Vision 2030 and the National Economic Strategy. These are: infrastructure, affordable housing and tourism/leisure. Within these three areas, that of infrastructure is also the key enabler for developments in the other two areas to be realized. In terms of a method of governance, the use of public-private-partnerships (PPPs was identified as being highly appropriate. Such partnerships are not only useful to leverage private sector investment into specific development projects but also to ensure that such development harnesses innovative and efficient methods.

  2. Clinical software development for the Web: lessons learned from the BOADICEA project.

    Science.gov (United States)

    Cunningham, Alex P; Antoniou, Antonis C; Easton, Douglas F

    2012-04-10

    In the past 20 years, society has witnessed the following landmark scientific advances: (i) the sequencing of the human genome, (ii) the distribution of software by the open source movement, and (iii) the invention of the World Wide Web. Together, these advances have provided a new impetus for clinical software development: developers now translate the products of human genomic research into clinical software tools; they use open-source programs to build them; and they use the Web to deliver them. Whilst this open-source component-based approach has undoubtedly made clinical software development easier, clinical software projects are still hampered by problems that traditionally accompany the software process. This study describes the development of the BOADICEA Web Application, a computer program used by clinical geneticists to assess risks to patients with a family history of breast and ovarian cancer. The key challenge of the BOADICEA Web Application project was to deliver a program that was safe, secure and easy for healthcare professionals to use. We focus on the software process, problems faced, and lessons learned. Our key objectives are: (i) to highlight key clinical software development issues; (ii) to demonstrate how software engineering tools and techniques can facilitate clinical software development for the benefit of individuals who lack software engineering expertise; and (iii) to provide a clinical software development case report that can be used as a basis for discussion at the start of future projects. We developed the BOADICEA Web Application using an evolutionary software process. Our approach to Web implementation was conservative and we used conventional software engineering tools and techniques. The principal software development activities were: requirements, design, implementation, testing, documentation and maintenance. The BOADICEA Web Application has now been widely adopted by clinical geneticists and researchers. BOADICEA Web

  3. Financing arrangements for nuclear power projects in developing countries

    International Nuclear Information System (INIS)

    1993-01-01

    This reference book reviews the main features and problems or difficulties involved in the financing of nuclear power projects with special reference to developing countries. It provides basic information and advice to developing countries interested in nuclear power projects as part of their power sector planning. The book outlines the general characteristics of financing a nuclear power project and presents innovative approaches for power generation financing. It discusses the special conditions and requirements of nuclear power projects and their financing complexities. The focus is on the practical issues that need to be dealt with in order to successfully finance these power projects, as well as the constraints faced by most developing countries. Possible ways and means of dealing with these constraints are presented. 58 refs, figs and tabs

  4. Institutional support for projects development

    International Nuclear Information System (INIS)

    Tobar, Carlos

    2000-01-01

    The paper describes the institutional support to develop projects on renewable energy, also describes the different ways to obtain financial support from the public sector and the interaction among private sector, universities and non governmental agencies in training, research and generation of energy

  5. Balbina's region sustainable development project

    International Nuclear Information System (INIS)

    Hargreaves, Paul

    1994-01-01

    This work presents a planning and administration of an environmental project proposal for Balbina's lake hydroelectric power station restoration. The socio-economic objectives are the hydro-forest bio production development which include fishery, specialized tourism, leisure, besides the processing of industrial raw materials

  6. Energy and economic development in isolated regions: a case study

    International Nuclear Information System (INIS)

    Munoz, A.; Maldonado, P.

    1992-01-01

    High production costs and inadequate supply of electricity are severe handicaps to economic development in remote areas. Costs are increased further by the low level and high variability of electric loads. In order to face these problems a simultaneous development of wind diesel energy resources and productive projects with demand management is proposed. This paper illustrates such a case in Southern Chile where present electricity costs are reduced as consumption is increased from 85 to 468 KWh/person/year. A new refrigeration plant increases the storage capacity for the small fishing activity and effectively uses the output of wind energy generators. (author)

  7. Optimizing integrated reference cases in the OCTAVIUS project

    DEFF Research Database (Denmark)

    Kvamsdal, Hanne M.; Ehlers, Sören; Kather, Alfons

    2016-01-01

    . This is important especially for the coal fired power plant, where integration of waste heat from the capture plant or the CO2 compressor intercoolers can lead to a significant increase in overall efficiency. The configuration of intercoolers for the CO2 compressor is adapted to achieve the highest overall...... the CESAR, CAESAR, and DECARBit projects, two reference power plants are modelled in Ebsilon®Professional. The first is an 800 MWe coal case, the second a 430 MWe natural gas combined cycle (NGCC) case. For each power plant two separate capture plants are considered: one using 30 wt% MEA as solvent system...... efficiency. For the natural gas combined cycle plant, integration is not that beneficial, since there is no heat sink available in the water steam cycle. In the end, the cost of electricity and cost of CO2 avoided is calculated for all four cases. While the CESAR1 solvent system in a conventional absorber...

  8. Accelerating Software Development through Agile Practices--A Case Study of a Small-Scale, Time-Intensive Web Development Project at a College-Level IT Competition

    Science.gov (United States)

    Zhang, Xuesong; Dorn, Bradley

    2012-01-01

    Agile development has received increasing interest both in industry and academia due to its benefits in developing software quickly, meeting customer needs, and keeping pace with the rapidly changing requirements. However, agile practices and scrum in particular have been mainly tested in mid- to large-size projects. In this paper, we present…

  9. Sustainability, creativity and innovation in project management – Model development for assessing organizational performance through projects

    OpenAIRE

    Szabó, Lajos

    2016-01-01

    Today a number of studies are published on how organizational strategy is developed and how organizations contribute to local and regional development through the realization of these strategies. There are also many articles dealing with the success of a project by identifying the criteria and the factors that influence them. This article introduces the project-oriented strategic planning process that reveals how projects contribute to local and regional development and demonstrates the relat...

  10. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  11. The Unseen Face of E-Business Project Development

    OpenAIRE

    Mesnita, Gabriela; Vasilica, Tiberiu

    2003-01-01

    The purpose of this paper is intent on identify and analyze the unseen factors of successful or failure of e-business project development. The IT managers must take into account both all costs involved in e-business development and all phases (analysis, design, testing, implementation, maintenance and operation) according to principle of project management for software/systems life cycle development. There are many solutions to exceed these factors of failure among could be counted outsourcin...

  12. Improving new product development (NPD process by analyzing failure cases

    Directory of Open Access Journals (Sweden)

    Yeon-Hak Kim

    2017-01-01

    Full Text Available Purpose - The purpose of this study is to develop an appropriate new product development (NPD process of Company “T”, a medium-sized firm, by analyzing the existing NPD process and failure cases of the Company. Design/methodology/approach - The proposed research framework is as follows: first, prospective studies of the NPD process are performed using the existing literature and preliminary references; second, comparative analysis between the current processes and a NPD process is performed; third, phase-based evaluations upon failed product cases are conducted with a NPD process so as to identify the abridged steps and root-causes of failures; finally, renewed priorities are set forth by utilizing the analytic hierarchy process analysis and questionnaire analysis upon the above identified causes of failures. Findings - The resulting accomplishments include the establishment of NPD processes that resonates with the current states of Company “T”, which, in turn, ensures the increase of efficiency, the decrease in development duration and the strategy of capacity-concentration and priority-selection. Originality/value - As Company “T”’s development process is outdated and products are developed without adequate market information research and feasibility analysis, the percentage of failed development project is as high as 87 per cent. Thus, this study aims to develop an appropriate NPD process of Company “T” by analyzing the existing NPD process and failure cases of the Company.

  13. Electricity supply options, sustainable development and climate change priorities. Case studies for South Africa

    International Nuclear Information System (INIS)

    Winkler, H.; Mukheibir, P.; Mwakasonda, S.; Garg, A.; Halsnaes, K.

    2007-09-01

    This report summarizes the results of the project Projecting future energy demand: Balancing development, energy and climate priorities in large developing economies, which has been managed by UNEP Risoe Centre on behalf of UNEP DTIE. The report argues that starting from development objectives is critical to mitigation efforts in developing countries. Instead of defining local benefits as ancillary to mitigation, reductions of GHG emissions should be seen as the co-benefits of policies that drive local sustainable development. A development-focused approach seems more likely to be implemented than the imposition of GHG targets by the international community - especially as South Africa has adopted development targets such as the Millennium Development Goals and promoted the Johannesburg Plan of Action. The case studies presented take as their starting point development objectives, rather than climate change targets. The form of climate action which it investigates is sustainable development policies and measures. (BA)

  14. Project-based faculty development for e-learning.

    Science.gov (United States)

    Vyas, Rashmi; Faith, Minnie; Selvakumar, Dhayakani; Pulimood, Anna; Lee, Mary

    2016-12-01

    The Christian Medical College, Vellore, in collaboration with Tufts University, Boston, conducted an advanced workshop in e-learning for medical faculty members in India. E-learning can enhance educational reforms for today's computer-literate generation, and keep faculty members up to speed in a rapidly changing world. The purpose of this paper is to report on the design and evaluation of a project-based faculty member development programme focused on developing faculty members as educators and as peer trainers who can use e-learning for educational reforms. During a 2-day workshop, 29 participants in groups of two or three developed 13 e-learning projects for implementation in their institutions. Evaluation of the workshop was through written feedback from the participants at the end of the workshop and by telephone interview with one participant from each project group at the end of one year. Content analysis of qualitative data was perfomed. The participants reported that they were motivated to implement e-learning projects and recognised the need for and usefulness of e-learning. The majority of projects (10 out of 13) that were implemented 'to some extent' or 'to a great extent' faced challenges with a lack of resources and administrative support, but faculty members were able to overcome them. E-learning can enhance educational reforms for today's computer-literate generation IMPLICATIONS: Designing feasible e-learning projects in small groups and obtaining hands-on experience with e-learning tools enhance the effectiveness of subsequent implementation. To successfully incorporate e-learning when designing educational reforms, faculty member training, continuing support and infrastructure facilities are essential. © 2016 John Wiley & Sons Ltd.

  15. Strip reduction testing of lubricants developed during ENFORM project

    DEFF Research Database (Denmark)

    Gazvoda, S.; Andreasen, Jan Lasson; Olsson, David Dam

    Strip reduction testing of lubricants developed during ENFORM project. Experiments were conducted with the strip reduction test [1] in order to classify experimental lubricants, developed during concerned project. One reference lubricant was used during testing....

  16. Minerals and energy: major development projects - April 2006 listing

    Energy Technology Data Exchange (ETDEWEB)

    William Mollard [Australian Bureau of Agricultural and Resource Economics (ABARE), Canberra, ACT (Australia)

    2006-06-15

    ABARE's project list, released around May and November each year, lists completed and committed projects in the minerals and energy sector in Australia. Santos' $200 million Casino gas field project in Bass Strait will produce natural gas and condensate while output from Berwyndale South will be coal seam methane. Five coal projects were completed in the six months to April 2006. The largest of these was Xstrata's Newlands Northern underground mine. In the same region, BMA's (BHP Billiton Mitsubishi Alliance) $102 million Broadmeadow underground mine and BHP/Mitsui Coal's $50 million Poitrel opencut mine, both near Moranbah, were brought into production. In New South Wales, two projects a new mine and a mine infrastructure development, both near Singletonwere commissioned. Xstrata's new Ravensworth West opencut mine will produce up to 1.5 million tonnes a year of thermal coal. Excel Coal's $73 million Wambo Rail project involved building a rail loop and loading facilities at its Wambo operation. Queensland coal mine projects and coal infrastructure developments account for 19 per cent (or $6.3 billion) of the estimated capital cost of $34 billion for all advanced projects. The largest coal mine development is the $1 billion Dawson mine expansion which is expected to add around 12 million tonnes of coking and thermal coal capacity, commencing in early 2007. Anglo Coal/Mitsui is also developing the large new Lake Lindsay opencut mine. Rio Tinto is developing its $440 million Clermont opencut mine. Twelve other advanced coal mine developments in Queensland are expected to raise coal production capacity by around 30 million tonnes a year by 2008. 10 figs., 4 tabs.

  17. Environmental-impact assessment of dams and reservoir projects (review and a case study)

    International Nuclear Information System (INIS)

    Shah, S.M.

    2009-01-01

    Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)

  18. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    Science.gov (United States)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  19. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    Science.gov (United States)

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  20. Rethinking the Role of Development Banks in Climate Finance: Panama’s Barro Blanco CDM Project and Human Rights

    Directory of Open Access Journals (Sweden)

    Beatriz Felipe Pérez

    2016-06-01

    Full Text Available Development banks are key actors in climate finance. During the last decades, they have increased the funding of climate change related projects, especially those under the Clean Development Mechanism (CDM. Defined in Article 12 of the Kyoto Protocol, the CDM aims at contributing to climate change mitigation while assisting in achieving sustainable development. However, many CDM projects have caused environmental damage and human rights abuses that especially affect the most vulnerable people. Located in Panama, the Barro Blanco hydro-power dam exemplifies the complex interrelationship of climate financing, development policies, the political and economic national context and human rights. Through the analysis of the role of development banks in climate finance, especially in the context of CDM projects, this paper aims (1 to clarify the role of development banks in climate finance, (2 to shed light on the vulnerable situation of the people affected by these projects, (3 to highlight the gaps in both the CDM rules and the development banks’ safeguard policies concerning the protection of human rights and the prevention of environmental abuses, and (4 to give a current example of this complex situation through the Barro Blanco case study. This paper argues that the manifold and often competing national and international legal and political layers of climate change mitigation projects repeatedly leave project affected people vulnerable to human rights violations without adequate safeguards and mechanisms to effectively articulate their interests, protect their rights and promote access to justice.

  1. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  2. The Veggie Project: a case study of a multi-component farmers' market intervention.

    Science.gov (United States)

    Freedman, Darcy A; Bell, Bethany A; Collins, Leslie V

    2011-08-01

    This case study provides an in-depth examination of process and feasibility factors associated with the development of a multi-component environmental intervention designed to increase access to fresh fruits and vegetables in four low-income, minority, urban communities with few healthy food retail outlets. The intervention, the Veggie Project, included three components: (a) onsite farmers' markets, (b) a Super Shopper voucher program, and (c) a Youth Leader Board. We analyzed receipts from sales transactions at the farmers' markets, close-ended surveys with participants, in-depth interviews with project stakeholders, and journal entries completed by youth participants. Thirty-four farmers' markets occurred, resulting in 1,101 sales transactions. Financial vouchers were used to purchased 63% of the produce. All of the youth Super Shoppers came to the market at least once and made significantly more purchase transactions than adults. The farmers' markets were never accessed by 38% of the adult Super Shoppers. The Veggie Project increased access to healthy foods, particularly among youth. More research is warranted to examine the relationship between market use and dietary behaviors as well as other factors (i.e., besides physical and economic) influencing food access among adults.

  3. PORTFOLIO MANAGEMENT IN NEW PRODUCTS DEVELOPMENT IN THE TELECOMMUNICATION SECTOR IN BRAZIL: A MULTIPLE CASES STUDY

    Directory of Open Access Journals (Sweden)

    Roque Rabechini Jr.

    2017-06-01

    Full Text Available This study aimed to understand how the use of portfolio management practices influence the development of new products in the Brazilian telecommunications operators. The chosen alternative methodology was the multiple case study. The results showed that the processes of identification, selection and prioritization projects influence the development of new products. Specifically, we found that the optimization of resources and product launch projects in short periods of time, are indicators to reveal the possibilities of organizations to remain competitive in the market.

  4. Project Photofly: New 3d Modeling Online Web Service (case Studies and Assessments)

    Science.gov (United States)

    Abate, D.; Furini, G.; Migliori, S.; Pierattini, S.

    2011-09-01

    During summer 2010, Autodesk has released a still ongoing project called Project Photofly, freely downloadable from AutodeskLab web site until August 1 2011. Project Photofly based on computer-vision and photogrammetric principles, exploiting the power of cloud computing, is a web service able to convert collections of photographs into 3D models. Aim of our research was to evaluate the Project Photofly, through different case studies, for 3D modeling of cultural heritage monuments and objects, mostly to identify for which goals and objects it is suitable. The automatic approach will be mainly analyzed.

  5. Voices from the Field: Developing Employability Skills for Archaeological Students Using a Project Based Learning Approach

    Science.gov (United States)

    Wood, Gaynor

    2016-01-01

    Graduate employment statistics are receiving considerable attention in UK universities. This paper looks at how a wide range of employability attributes can be developed with students, through the innovative use of the Project Based Learning (PjBL) approach. The case study discussed here involves a group of archaeology students from the University…

  6. Financing the development of renewable energy projects of territorial interest

    International Nuclear Information System (INIS)

    Regnier, Yannick; Bailleul, Esther; Claustre, Raphael; Bessiere, Patrick; Boumard, Erwan; Peulemeulle, Justine; Causse, Laurent; Coton, Patrice; Djemouai, Nadia; Dubus, Jean-Michel; Duffes, Thomas; Gauduchon, Marie-Veronique; Raguet, Alex; Ghewy, Etienne; Heitz, Philippe; Jedliczka, Marc; Jourdain, Pierre; Julien, Emmanuel; Marcenac, Guillaume; Marillier, Frederic; Massias, Louis; Picot, Roland; Poize, Noemie; Quantin, Jacques; Rabian, Jean; Rocaboy, Dominique; Rumolino, Claudio; Sabin, Patrick; Saultier, Patrick; Tincelin-Salomon, Claire; Trillaud, Nicolas; Vachette, Philippe; Verhaeghe, Laure

    2016-11-01

    This report highlights the relationship between a territorial project (its autonomous strategy) and projects of renewable energy which could and should be developed. It focuses on large projects of electric power production, notably those based on solar and wind energy for which such a territorial anchoring is not as obvious as for the production of heat or gas (heat networks are necessarily local, and biomass production and supply as well). Thus, its outlines how these projects can be a benefit for a territory, the stakes of participation for the different local actors, and discusses how such a participation is to be organised. It describes different aspects of the way a project development phase is to be financed: stakes (financing needs, risks, peculiarities of local financing, project management and governance), financing typologies, development ease and safety, support of development financing (capital-risk tools, intervention of local public companies, advance payments, subsidies). The last part addresses how to locally finance the other project phases (stakes during construction and exploitation, intervention modes by participation, financial tools or loans)

  7. The Case Study as Research Heuristic: Lessons from the R&D Value Mapping Project.

    Science.gov (United States)

    Bozeman, Barry; Klein, Hans K.

    1999-01-01

    Examines the role of prototype case studies as the foundation for later evaluation through two studies from the "R&D Value Mapping Project," a study that will involve more than 30 cases. Explores the usefulness of case studies in defining and assessing subsequent research efforts. (SLD)

  8. All projects related to | Page 26 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    A comparative study of child marriage and parenthood in Ethiopia, India, Peru ... The aim of this project is to enhance the understanding of the complexities of child ... Closing the gender gap in financial inclusion: Advancing the business case.

  9. Mitigation and Compensation under EU Nature Conservation Law in the Flemish Region: Beyond the Deadlock for Development Projects?

    Directory of Open Access Journals (Sweden)

    Hendrik Schoukens

    2014-05-01

    Full Text Available For years, the predicament of many of the European protected habitats and species in the Flemish Region, as in many other Member States, passed relatively unnoticed. The lack of proper rules and clear implementation rules fuelled the impression amongst project developers and planning authorities that the impacts of project developments on biodiversity did not really warrant closer assessment. However, in the past ten years, strict national case law has significantly altered this view. Faced with tighter judicial scrutiny, the Habitats and Birds Directives were seen as an important obstacle to project development. Hence mitigation and compensation have now come up as novel approaches to better align spatial aspirations with the conservation of nature. In reality, mitigation was often used as a cover-up for projects that would not fit the strict requirements enshrined in the derogatory clauses. Interestingly, the Belgian Council of State showed itself quite cautious in reasserting the lax view of some planning authorities on mitigation and compensation. In reviewing the legality of several new approaches to mitigation and compensation, the Belgian Council of State, which was initially very cautious in quashing decisions that would actually jeopardise major infrastructure developments, has rendered some compelling rulings on the specific application of mitigation and compensatory measures in a spatial planning context. By letting the objectives of EU nature conservation law prevail in the face of economic interests, the recent case law of the Belgian Council of State can be seen as a remarkable example of judicial environmental activism.

  10. CDM sustainable development impacts developed for the UNEP project 'CD4CDM'

    Energy Technology Data Exchange (ETDEWEB)

    Olhoff, Anne; Markandya, Anil; Halsnaes, Kirsten; Taylor, Tim

    2004-07-01

    The Clean Development Mechanism (CDM), an innovative cooperative mechanism under the Kyoto Protocol, is designed with the dual aim of assisting developing countries in achieving sustainable development (SD) and of assisting industrialised countries in achieving compliance with their greenhouse gas (GHG) emission reduction commitments. The SD dimension is not merely a requirement of the CDM; it should be seen as a main driver for developing country interest in participating in CDM projects. This is so, since apart from GHG emission reductions CDM projects will have a number of impacts in the host countries, including impacts on economic and social development and on the local environment. Furthermore, the selecting of the SD criteria and the assessment of the SD impacts are sovereign matters of the host countries in the current operationalisation of the Kyoto Protocol. National authorities can thus use the SD dimension to evaluate key linkages between national development goals and CDM projects, with the aim of selecting and designing CDM projects so that they create and maximise synergies with local development goals. (au)

  11. Teaching Case: Enterprise Architecture Specification Case Study

    Science.gov (United States)

    Steenkamp, Annette Lerine; Alawdah, Amal; Almasri, Osama; Gai, Keke; Khattab, Nidal; Swaby, Carval; Abaas, Ramy

    2013-01-01

    A graduate course in enterprise architecture had a team project component in which a real-world business case, provided by an industry sponsor, formed the basis of the project charter and the architecture statement of work. The paper aims to share the team project experience on developing the architecture specifications based on the business case…

  12. Student ownership of projects in an upper-division optics laboratory course: A multiple case study of successful experiences

    Science.gov (United States)

    Dounas-Frazer, Dimitri R.; Stanley, Jacob T.; Lewandowski, H. J.

    2017-12-01

    We investigate students' sense of ownership of multiweek final projects in an upper-division optics lab course. Using a multiple case study approach, we describe three student projects in detail. Within-case analyses focused on identifying key issues in each project, and constructing chronological descriptions of those events. Cross-case analysis focused on identifying emergent themes with respect to five dimensions of project ownership: student agency, instructor mentorship, peer collaboration, interest and value, and affective responses. Our within- and cross-case analyses yielded three major findings. First, coupling division of labor with collective brainstorming can help balance student agency, instructor mentorship, and peer collaboration. Second, students' interest in the project and perceptions of its value can increase over time; initial student interest in the project topic is not a necessary condition for student ownership of the project. Third, student ownership is characterized by a wide range of emotions that fluctuate as students alternate between extended periods of struggle and moments of success while working on their projects. These findings not only extend the literature on student ownership into a new educational domain—namely, upper-division physics labs—they also have concrete implications for the design of experimental physics projects in courses for which student ownership is a desired learning outcome. We describe the course and projects in sufficient detail that others can adapt our results to their particular contexts.

  13. The supervisor in the project-organized group work should participate in developing the students' project competencies

    DEFF Research Database (Denmark)

    Hansen, Søren

    2004-01-01

    The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects.......The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects....

  14. 3D Projection on Physical Objects: Design Insights from Five Real Life Cases

    DEFF Research Database (Denmark)

    Dalsgaard, Peter; Halskov, Kim

    2011-01-01

    3D projection on physical objects is a particular kind of Augmented Reality that augments a physical object by projecting digital content directly onto it, rather than by using a mediating device, such as a mobile phone or a head- mounted display. In this paper, we present five cases in which we...

  15. All projects related to Ethiopia | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    A comparative study of child marriage and parenthood in Ethiopia, India, Peru and Zambia. Project. The aim of this project is to enhance the understanding of the complexities of ... Entrepreneurship and small business development in Ethiopia.

  16. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  17. Developing Project Duration Models in Software Engineering

    Institute of Scientific and Technical Information of China (English)

    Pierre Bourque; Serge Oligny; Alain Abran; Bertrand Fournier

    2007-01-01

    Based on the empirical analysis of data contained in the International Software Benchmarking Standards Group(ISBSG) repository, this paper presents software engineering project duration models based on project effort. Duration models are built for the entire dataset and for subsets of projects developed for personal computer, mid-range and mainframeplatforms. Duration models are also constructed for projects requiring fewer than 400 person-hours of effort and for projectsre quiring more than 400 person-hours of effort. The usefulness of adding the maximum number of assigned resources as asecond independent variable to explain duration is also analyzed. The opportunity to build duration models directly fromproject functional size in function points is investigated as well.

  18. Development of Direct-Use Projects: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Lund, J.

    2011-01-01

    A geothermal direct-use project utilizes a natural resource, a flow of geothermal fluid at elevated temperatures, which is capable of providing heat and/or cooling to buildings, greenhouses, aquaculture ponds, and industrial processes. Geothermal utilization requires matching the varied needs of the user and characteristics of the resource in order to development a successful project. Each application is unique; guidelines are provided for the logical steps required to implement a project. Recommended temperature and flows are suggested for spas and pools, space and district heating, greenhouse and aquaculture pond heating, and industrial applications. Guidelines are provided for selecting the necessary equipment for successfully implementing a direct-use project, including downhole pumps, piping, heat exchangers, and heat convectors. Additionally, the relationship between temperature, flow rate, and the use of heat exchangers to provide heat to a space with hot water or hot air is provided for a number of applications, with suggested 'rules of thumb'.

  19. The Medieval Dublin Project: A Case Study

    Directory of Open Access Journals (Sweden)

    Niall O'hOisin

    2010-04-01

    Full Text Available This paper provides an overview of the Medieval Dublin Project. It covers the development and release of the DVD ‘Medieval Dublin: From Vikings to Tudors (Schools Edition,’ and outlines the major virtual and interactive features developed for that release. The paper also covers the collaboration that took place between the DVD development team and the academic community and discusses the ways in which 3D visualisations, timelines, interactivity and character-based storytelling were used to present Dublin’s archaeological heritage in an engaging and interesting way

  20. Real options and volume uncertainty by field development projects

    International Nuclear Information System (INIS)

    Ekern, S.; Stensland, G.

    1993-12-01

    The report concerns a study on the use of option methodology in field development projects. The report shows how the value of flexibility in the different decision processes is to be found by means of real option methodology. Particular attention is laid on the uncertainty concerning the volume of reserves and production capacity. The results from the study were based on the research project dubbed ''Use of real options in field development projects''. The project is partially connected to another project dubbed ''Decisive behaviour and alternative action under uncertainty in the petroleum sector''. Main topics cover as follow: Example with volume uncertainty; real options and volume uncertainty; gradual disclosure of uncertainty in the production; value of flexible production equipment. 33 refs., 19 figs., 17 tabs

  1. Programmes and projects for high-temperature reactor development

    International Nuclear Information System (INIS)

    Bogusch, Edgar; Hittner, Dominique

    2009-01-01

    An increasing attention has to be recognised worldwide on the development of High-Temperature Reactors (HTR) which has started in Germany and other countries in the 1970ies. While pebble bed reactors with spherical fuel elements have been developed and constructed in Germany, countries such as France, the US and Russia investigated HTR concepts with prismatic block-type fuel elements. The concept of a modular HTR formerly developed by Areva NP was an essential basis for the HTR-10 in China. A pebble bed HTR for electricity production is developed in South Africa. The construction is planned after the completion of the licensing procedure. Also the US is planning an HTR under the NGNP (Next Generation Nuclear Plant) Project. Due to the high temperature level of the helium coolant, the HTR can be used not only for electricity production but also for supply of process heat. Including its inherent safety features the HTR is an attractive candidate for heat supply to various types of plants e.g. for hydrogen production or coal liquefactions. The conceptual design of an HTR with prismatic fuel elements for the cogeneration of electricity and process heat has been developed by Areva NP. On the European scale the HTR development is promoted by the RAPHAEL (ReActor for Process heat, Hydrogen And ELectricity generation) project. RAPHAEL is an Integrated Project of the Euratom 6th Framework Programme for the development of technologies towards a Very High-Temperature Reactor (VHTR) for the production of electricity and heat. It is financed jointly by the European Commission and the partners of the HTR Technology Network (HTR-TN) and coordinated by Areva NP. The RAPHAEL project not only promotes HTR development but also the cooperation with other European projects such as the material programme EXTREMAT. Furthermore HTR technology is investigated in the frame of Generation IV International Forum (GIF). The development of a VHTR with helium temperatures above 900 C for the

  2. Growth and project finance in the least developed countries

    OpenAIRE

    Lisbeth F. la Cour; Jennifer Müller

    2014-01-01

    This article examines the effects of project finance on economic growth in the least developed countries (LDC). Inspired by the neoclassical growth model we set up an econometric model to estimate the effects of project finance for a sample consisting of 38 of the least developed countries using data from the period 1994-2007. The results of our study suggest, that project finance has a significant positive effect on economic growth and therefore constitute an important source of ...

  3. Improving Initiation and Tracking of Research Projects at an Academic Health Center: A Case Study.

    Science.gov (United States)

    Schmidt, Susanne; Goros, Martin; Parsons, Helen M; Saygin, Can; Wan, Hung-Da; Shireman, Paula K; Gelfond, Jonathan A L

    2017-09-01

    Research service cores at academic health centers are important in driving translational advancements. Specifically, biostatistics and research design units provide services and training in data analytics, biostatistics, and study design. However, the increasing demand and complexity of assigning appropriate personnel to time-sensitive projects strains existing resources, potentially decreasing productivity and increasing costs. Improving processes for project initiation, assigning appropriate personnel, and tracking time-sensitive projects can eliminate bottlenecks and utilize resources more efficiently. In this case study, we describe our application of lean six sigma principles to our biostatistics unit to establish a systematic continual process improvement cycle for intake, allocation, and tracking of research design and data analysis projects. The define, measure, analyze, improve, and control methodology was used to guide the process improvement. Our goal was to assess and improve the efficiency and effectiveness of operations by objectively measuring outcomes, automating processes, and reducing bottlenecks. As a result, we developed a web-based dashboard application to capture, track, categorize, streamline, and automate project flow. Our workflow system resulted in improved transparency, efficiency, and workload allocation. Using the dashboard application, we reduced the average study intake time from 18 to 6 days, a 66.7% reduction over 12 months (January to December 2015).

  4. Development of a major hydroelectric project in the Pacific Rim

    International Nuclear Information System (INIS)

    Afshar, Y.; Kwiatkowski, R.W.

    1990-01-01

    Developing a major international energy project requires the assembly and close coordination of various factors. Some of the specific factors include identification of the client, specific project identification, establishing the need for the project, identifying the pros and cons of the project, technical and financial feasibility of the project, identifying sources of financing, identifying the competitions, studying possible teaming arrangements, involvement of local firms and representatives, and developing a strategy that will lead to the successful negotiation of the contract. This paper briefly addresses each of the factors

  5. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

  6. Teaching Introductory Oceanography through Case Studies: Project based approach for general education students

    Science.gov (United States)

    Farnsworth, K. L.; House, M.; Hovan, S. A.

    2013-12-01

    A recent workshop sponsored by SERC-On the Cutting Edge brought together science educators from a range of schools across the country to discuss new approaches in teaching oceanography. In discussing student interest in our classes, we were struck by the fact that students are drawn to emotional or controversial topics such as whale hunting and tsunami hazard and that these kinds of topics are a great vehicle for introducing more complex concepts such as wave propagation, ocean upwelling and marine chemistry. Thus, we have developed an approach to introductory oceanography that presents students with real-world issues in the ocean sciences and requires them to explore the science behind them in order to improve overall ocean science literacy among non-majors and majors at 2 and 4 year colleges. We have designed a project-based curriculum built around topics that include, but are not limited to: tsunami hazard, whale migration, ocean fertilization, ocean territorial claims, rapid climate change, the pacific trash patch, overfishing, and ocean acidification. Each case study or project consists of three weeks of class time and is structured around three elements: 1) a media analysis; 2) the role of ocean science in addressing the issue; 3) human impact/response. Content resources range from textbook readings, popular or current print news, documentary film and television, and data available on the world wide web from a range of sources. We employ a variety of formative assessments for each case study in order to monitor student access and understanding of content and include a significant component of in-class student discussion and brainstorming guided by faculty input to develop the case study. Each study culminates in summative assessments ranging from exams to student posters to presentations, depending on the class size and environment. We envision this approach for a range of classroom environments including large group face-to-face instruction as well as hybrid

  7. Automotive Stirling Engine Development Project

    Science.gov (United States)

    Ernst, William D.; Shaltens, Richard K.

    1997-01-01

    The development and verification of automotive Stirling engine (ASE) component and system technology is described as it evolved through two experimental engine designs: the Mod 1 and the Mod 2. Engine operation and performance and endurance test results for the Mod 1 are summarized. Mod 2 engine and component development progress is traced from the original design through hardware development, laboratory test, and vehicle installation. More than 21,000 hr of testing were accomplished, including 4800 hr with vehicles that were driven more dm 59,000 miles. Mod 2 engine dynamometer tests demonstrated that the engine system configuration had accomplished its performance goals for power (60 kW) and efficiency (38.5%) to within a few percent. Tests with the Mod 2 engine installed in a delivery van demonstrated combined metro-highway fuel economy improvements consistent with engine performance goals and the potential for low emission levels. A modified version of the Mod 2 has been identified as a manufacturable design for an ASE. As part of the ASE project, the Industry Test and Evaluation Program (ITEP), NASA Technology Utilization (TU) project, and the industry-funded Stirling Natural Gas Engine program were undertaken to transfer ASE technology to end users. The results of these technology transfer efforts are also summarized.

  8. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  9. Developing financeable projects in Central Europe

    Energy Technology Data Exchange (ETDEWEB)

    Chelberg, R.; Prerad, V. [POWER International, Josefov (Czechoslovakia)

    1995-12-01

    POWER`s engineering and development experience in the Czech Republic creating financeable projects within the power generation industry will be presented. POWER has been involved in the Czech Republic`s privatization process, environmental legislation as well as formation of the regulatory environment. Strategic methods for accomplishing the development of financeable projects often include ownership and financial restructuring of the projects. This is done by utilizing internal cash flows, external debt and equity placement (provided by international financial institutions) by restructuring the facility`s contractual relationships and operations (providing as least cost solution to engineering) and possibly using existing governmental guarantees. In order to make any recommendations on how to come into compliance with the country`s environmental legislation, it is necessary to begin with an analysis of the existing facility. This involves preparation of technical and economic feasibility study, evaluation of technology and preliminary engineering solutions. It further involves restructuring of power sales agreements, heat sales agreements, and fuel supply agreements. The goal is to provide suitable security for the equity and debt financing participants by mitigating risk and creating a single purpose business unit with predictable life and economics.

  10. The Empty Shops Project: Developing Rural Students' Sociological Insight

    Science.gov (United States)

    Willis, Evan; Burns, Edgar

    2011-01-01

    An informal research project with high local relevance was developed for a first-year sociology course at an Australian rural university campus. The project developed students' sociological insight by challenging them to investigate "truths" about their own region, rather than immediately pushing them to comprehend new and different…

  11. Comparing internal and alliance-based new product development processes: case studies in the food industry

    OpenAIRE

    Olsen, Nina Veflen; Gripsrud, Geir

    2011-01-01

    This is the authors’ final, accepted and refereed manuscript to the article Companies may simultaneously pursue different new product development (NPD) strategies. This article reports a comparative two case design study of in-house NPD projects as well as alliance based NPD projects in a food company. Two contradicting proposition’s of the efficiency of NPD in an alliance compared to NPD performed internally are stated, and the findings indicate that the alliance based NPD solution create...

  12. Comparing internal and alliance-based new product development processes: case studies in the food industry

    OpenAIRE

    Olsen, Nina Veflen; Gripsrud, Geir

    2011-01-01

    Companies may simultaneously pursue different new product development (NPD) strategies. This article reports a comparative two case design study of in-house NPD projects as well as alliance based NPD projects in a food company. Two contradicting proposition’s of the efficiency of NPD in an alliance compared to NPD performed internally are stated, and the findings indicate that the alliance based NPD solution creates a better context for NPD than the in-house solution. Less forwarding of unsol...

  13. Cost-effectiveness of environmental management for vector control in resource development projects.

    Science.gov (United States)

    Bos, R

    1991-01-01

    Vector control methods are traditionally divided in chemical, biological and environmental management approaches, and this distinction also reflected in certain financial and economic aspects. This is particularly true for environmental modification, usually engineering or other structural works. It is highly capital intensive, as opposed to chemical and biological control which require recurrent expenditures, and discount rates are therefore a prominent consideration in deciding for one or the other approach. Environmental manipulation requires recurrent action, but can often be carried out with the community participation, which raises the issue of opportunity costs. The incorporation of environmental management in resource projects is generally impeded by economic considerations. The Internal Rate of Return continues to be a crucial criterion for funding agencies and development banks to support new projects; at the same time Governments of debt-riden countries in the Third World will do their best to avoid additional loans on such frills as environmental and health safeguards. Two approaches can be recommended to nevertheless ensure the incorporation of environmental management measures in resource projects in an affordable way. First, there are several examples of cases where environmental management measures either have a dual benefit (increasing both agricultural production and reducing vector-borne disease transmission) or can be implemented at zero costs. Second, the additional costs involved in structural modifications can be separated from the project development costs considered in the calculations of the Internal Rate of Return, and financial support can be sought from bilateral technical cooperation agencies particularly interested in environmental and health issues. There is a dearth of information in the cost-effectiveness of alternative vector control strategies in the developing country context. The process of integrating vector control in the

  14. Development of Risk Uncertainty Factors from Historical NASA Projects

    Science.gov (United States)

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  15. How to use the clean development mechanism in the residential sector? The case of Brazilian refrigerators

    International Nuclear Information System (INIS)

    Khalil, Helioui; Cohen, Claude; Salem Szklo, Alexandre

    2006-01-01

    The definition of simple and reliable emission baselines is crucial to foster clean development mechanism (CDM) projects. This paper assesses a project methodology that could boost large-scale energy-efficiency projects in the sector of domestic appliances. The baseline appliance is defined a priori in a 'conservative' manner as the design option minimizing life-cycle social costs. The project methodology consists in a program which rebates new appliances according to their emission savings compared to the baseline. Is the proposed baseline acceptable? What could be the impact of such project on emissions? To address these questions, we look for insights from a hypothetical case on Brazilian refrigerators. A rational choice model is developed which assumes that households select design options minimizing life-cycle private costs. Results suggest that electricity tariff distortions and financial constraints might hamper project performances and allow significant free-riding. Low income households remain trapped into low-efficiency choices and high income households adopt outperforming appliances, whether rebated or not. However, simple solutions likely to improve the project methodology do exist

  16. Student ownership of projects in an upper-division optics laboratory course: A multiple case study of successful experiences

    Directory of Open Access Journals (Sweden)

    Dimitri R. Dounas-Frazer

    2017-12-01

    Full Text Available We investigate students’ sense of ownership of multiweek final projects in an upper-division optics lab course. Using a multiple case study approach, we describe three student projects in detail. Within-case analyses focused on identifying key issues in each project, and constructing chronological descriptions of those events. Cross-case analysis focused on identifying emergent themes with respect to five dimensions of project ownership: student agency, instructor mentorship, peer collaboration, interest and value, and affective responses. Our within- and cross-case analyses yielded three major findings. First, coupling division of labor with collective brainstorming can help balance student agency, instructor mentorship, and peer collaboration. Second, students’ interest in the project and perceptions of its value can increase over time; initial student interest in the project topic is not a necessary condition for student ownership of the project. Third, student ownership is characterized by a wide range of emotions that fluctuate as students alternate between extended periods of struggle and moments of success while working on their projects. These findings not only extend the literature on student ownership into a new educational domain—namely, upper-division physics labs—they also have concrete implications for the design of experimental physics projects in courses for which student ownership is a desired learning outcome. We describe the course and projects in sufficient detail that others can adapt our results to their particular contexts.

  17. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    Science.gov (United States)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  18. All projects related to | Page 165 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Improving Knowledge Management and Utilization of Research Results in Ecohealth Projects. Project. This study brings together lead investigators from 11 past and ongoing Ecohealth projects across Latin America who are interested in achieving better development outcomes guided by research results. End Date: August ...

  19. All projects related to | Page 535 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Aligning the National S&T Policy with the National Sustainable Development ... Project. Sri Lanka does not have an official science and technology (S&T) policy. ... Project. This action research project will study innovation in service delivery by local ... Topic: SOLID WASTES, WASTE MANAGEMENT, WASTE DISPOSAL.

  20. All projects related to | Page 31 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... Miscellaneous, Natural Resources, Science and Technology, Social Policy. Project ... Agricultural water innovations in the tropics – AgWIT. Project. This project seeks to contribute to agricultural resilience to climate change in Costa Rica and Brazil by developing more sustainable soil and water management strategies.

  1. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  2. Use of Multi-Disciplinary Projects To Develop Competence.

    Science.gov (United States)

    Trotman-Dickenson, Danusia

    1992-01-01

    Undergraduate technology and business students at the Polytechnic of Wales (United Kingdom) participated in multi-disciplinary team projects to experience real life business challenges and develop competences that employers expect in professionals. Lists characteristics of successful multi-disciplinary projects, discusses cost and industry…

  3. Metrics-based control in outsourced software development projects

    NARCIS (Netherlands)

    Ponisio, Laura; van Eck, Pascal

    2012-01-01

    Measurements have been recognised as vital instruments to improve control in outsourced software development projects. However, project managers are still struggling with the design and implementation of effective measurement programs. One reason for this is that although there is a large body of

  4. The JET Project Scientific and technical developments 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The JET (Joint European Torus) Project is fully described in EUR 5516e (EUR-JET-R5) 'The JET Project - Design Proposal'. This report describes developments in the project from the stage described in EUR 5516e until late in 1976. An introductory chapter describes the present state of the project and subsequent chapters deal in detail with the following topics: experimental programme aspects; vacuum vessel, pumping system, activation studies; toroidal field coils and mechanical structure; poloidal field system; assembly and maintenance; power supplies; control and data acquisition system; site and buildings

  5. Control of Ebola hemorrhagic fever: vaccine development and our Ebola project in Sierra Leone.

    Science.gov (United States)

    Watanabe, Tokiko; Kawaoka, Yoshihiro

    2016-01-01

    Since December 2013, West Africa has experienced the worst Ebola virus outbreak in recorded history. Of the 28,639 cases reported to the World Health Organization as of March 2016, nearly half (14,124) occurred in Sierra Leone. With a case fatality rate of approximately 40%, this outbreak has claimed the lives of 11,316 individuals. No FDA-approved vaccines or drugs are available to prevent or treat Ebola virus infection. Experimental vaccines and therapies are being developed; however, their safety and efficacy are still being evaluated. Therefore, there is an urgent need to develop control measures to prevent or limit future Ebola virus outbreaks.Previously, we developed a replication-defective Ebola virus that lacks the coding region for the essential viral transcription activator VP30 (Ebola ΔVP30 virus). Here, we evaluated the vaccine efficacy of Ebola ΔVP30 virus in a non-human primate model and describe our collaborative Ebola project in Sierra Leone.

  6. Project Development Specification for Special Protective Coating

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Establishes the performance, design development, and test requirements for the Special Protective Coating. The system engineering approach was used to develop this document in accordance with the guidelines laid out in the Systems Engineering Management Plan for Project W-314

  7. Project Development Specification for Valve Pit Manifold

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Establishes the performance, design development, and test requirements for the valve pit manifolds. The system engineering approach was used to develop this document in accordance with the guidelines laid out in the Systems Engineering Management Plan for Project W-314

  8. So many developers, so many projects: toward a motivation-based theory of project selection

    NARCIS (Netherlands)

    van Osch, W.; Adelaar, T.; Pith, M.

    2011-01-01

    Studies into open source software (OSS) development projects have hitherto focused on the question of why people aremotivated to contribute to these projects, thereby assuming that motivational factors are the same across all types of OSSprojects. In this study we challenge this assumption by

  9. Development of an image reconstruction algorithm for a few number of projection data

    International Nuclear Information System (INIS)

    Vieira, Wilson S.; Brandao, Luiz E.; Braz, Delson

    2007-01-01

    An image reconstruction algorithm was developed for specific cases of radiotracer applications in industry (rotating cylindrical mixers), involving a very few number of projection data. The algorithm was planned for imaging radioactive isotope distributions around the center of circular planes. The method consists of adapting the original expectation maximization algorithm (EM) to solve the ill-posed emission tomography inverse problem in order to reconstruct transversal 2D images of an object with only four projections. To achieve this aim, counts of photons emitted by selected radioactive sources in the plane, after they had been simulated using the commercial software MICROSHIELD 5.05, constitutes the projections and a computational code (SPECTEM) was developed to generate activity vectors or images related to those sources. SPECTEM is flexible to support simultaneous changes of the detectors's geometry, the medium under investigation and the properties of the gamma radiation. As a consequence of the code had been followed correctly the proposed method, good results were obtained and they encouraged us to continue the next step of the research: the validation of SPECTEM utilizing experimental data to check its real performance. We aim this code will improve considerably radiotracer methodology, making easier the diagnosis of fails in industrial processes. (author)

  10. Development of an image reconstruction algorithm for a few number of projection data

    Energy Technology Data Exchange (ETDEWEB)

    Vieira, Wilson S.; Brandao, Luiz E. [Instituto de Engenharia Nuclear (IEN-CNEN/RJ), Rio de Janeiro , RJ (Brazil)]. E-mails: wilson@ien.gov.br; brandao@ien.gov.br; Braz, Delson [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programa de Pos-graduacao de Engenharia (COPPE). Lab. de Instrumentacao Nuclear]. E-mail: delson@mailhost.lin.ufrj.br

    2007-07-01

    An image reconstruction algorithm was developed for specific cases of radiotracer applications in industry (rotating cylindrical mixers), involving a very few number of projection data. The algorithm was planned for imaging radioactive isotope distributions around the center of circular planes. The method consists of adapting the original expectation maximization algorithm (EM) to solve the ill-posed emission tomography inverse problem in order to reconstruct transversal 2D images of an object with only four projections. To achieve this aim, counts of photons emitted by selected radioactive sources in the plane, after they had been simulated using the commercial software MICROSHIELD 5.05, constitutes the projections and a computational code (SPECTEM) was developed to generate activity vectors or images related to those sources. SPECTEM is flexible to support simultaneous changes of the detectors's geometry, the medium under investigation and the properties of the gamma radiation. As a consequence of the code had been followed correctly the proposed method, good results were obtained and they encouraged us to continue the next step of the research: the validation of SPECTEM utilizing experimental data to check its real performance. We aim this code will improve considerably radiotracer methodology, making easier the diagnosis of fails in industrial processes. (author)

  11. Methodological Issues In Forestry Mitigation Projects: A CaseStudy Of Kolar District

    Energy Technology Data Exchange (ETDEWEB)

    Ravindranath, N.H.; Murthy, I.K.; Sudha, P.; Ramprasad, V.; Nagendra, M.D.V.; Sahana, C.A.; Srivathsa, K.G.; Khan, H.

    2007-06-01

    There is a need to assess climate change mitigationopportunities in forest sector in India in the context of methodologicalissues such as additionality, permanence, leakage, measurement andbaseline development in formulating forestry mitigation projects. A casestudy of forestry mitigation project in semi-arid community grazing landsand farmlands in Kolar district of Karnataka, was undertaken with regardto baseline and project scenariodevelopment, estimation of carbon stockchange in the project, leakage estimation and assessment ofcost-effectiveness of mitigation projects. Further, the transaction coststo develop project, and environmental and socio-economic impact ofmitigation project was assessed.The study shows the feasibility ofestablishing baselines and project C-stock changes. Since the area haslow or insignificant biomass, leakage is not an issue. The overallmitigation potential in Kolar for a total area of 14,000 ha under variousmitigation options is 278,380 tC at a rate of 20 tC/ha for the period2005-2035, which is approximately 0.67 tC/ha/yr inclusive of harvestregimes under short rotation and long rotation mitigation options. Thetransaction cost for baseline establishment is less than a rupee/tC andfor project scenario development is about Rs. 1.5-3.75/tC. The projectenhances biodiversity and the socio-economic impact is alsosignificant.

  12. Automation of Test Cases for Web Applications : Automation of CRM Test Cases

    OpenAIRE

    Seyoum, Alazar

    2012-01-01

    The main theme of this project was to design a test automation framework for automating web related test cases. Automating test cases designed for testing a web interface provide a means of improving a software development process by shortening the testing phase in the software development life cycle. In this project an existing AutoTester framework and iMacros test automation tools were used. CRM Test Agent was developed to integrate AutoTester to iMacros and to enable the AutoTester,...

  13. Advanced EVA Suit Camera System Development Project

    Science.gov (United States)

    Mock, Kyla

    2016-01-01

    The National Aeronautics and Space Administration (NASA) at the Johnson Space Center (JSC) is developing a new extra-vehicular activity (EVA) suit known as the Advanced EVA Z2 Suit. All of the improvements to the EVA Suit provide the opportunity to update the technology of the video imagery. My summer internship project involved improving the video streaming capabilities of the cameras that will be used on the Z2 Suit for data acquisition. To accomplish this, I familiarized myself with the architecture of the camera that is currently being tested to be able to make improvements on the design. Because there is a lot of benefit to saving space, power, and weight on the EVA suit, my job was to use Altium Design to start designing a much smaller and simplified interface board for the camera's microprocessor and external components. This involved checking datasheets of various components and checking signal connections to ensure that this architecture could be used for both the Z2 suit and potentially other future projects. The Orion spacecraft is a specific project that may benefit from this condensed camera interface design. The camera's physical placement on the suit also needed to be determined and tested so that image resolution can be maximized. Many of the options of the camera placement may be tested along with other future suit testing. There are multiple teams that work on different parts of the suit, so the camera's placement could directly affect their research or design. For this reason, a big part of my project was initiating contact with other branches and setting up multiple meetings to learn more about the pros and cons of the potential camera placements we are analyzing. Collaboration with the multiple teams working on the Advanced EVA Z2 Suit is absolutely necessary and these comparisons will be used as further progress is made for the overall suit design. This prototype will not be finished in time for the scheduled Z2 Suit testing, so my time was

  14. Adjustable Model of Renewable Energy Projects for Sustainable Development: A Case Study of the Nišava District in Serbia

    Directory of Open Access Journals (Sweden)

    Violeta Dimić

    2018-03-01

    Full Text Available This paper explores and ranks the key performance indicators of multi-criteria decision-making in the process of selecting renewable energy sources (RES. Different categories of factors (e.g., political, legal, technological, economic and financial, sociocultural, and physical are crucial for the analysis of such projects. In this paper, we apply the fuzzy analytic hierarchy process (fuzzy AHP method—a mathematical method—in order to analyze the main criteria for such projects, which include the environment, the organizational management structure, project participants, and participants’ relationship with the performance indicators. In order of ranking, the indicators are the following: time, costs, quality, monitoring the project’s sustainability, user feedback, and users’ health and safety. The aim of this paper is to point out the necessity of creating an adjustable model for renewable energy projects in order to proceed with the sustainable development of the southeast part of Serbia. This model should lead the creation process for such a project, with the aim of increasing its energy efficiency.

  15. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  16. Growth and Project Finance in the Least Developed Countries

    DEFF Research Database (Denmark)

    la Cour, Lisbeth F.; Müller, Jennifer

    2014-01-01

    for economic growth in LDCs. We find that a higher regulatory quality, lower government consumption and a higher level of education helps increase growth. The significance of these variables are, however, not as consistently robust as the results for project finance.......This article examines the effects of project finance on economic growth in the least developed countries (LDC). Inspired by the neoclassical growth model we set up an econometric model to estimate the effects of project finance for a sample consisting of 38 of the least developed countries using...... data from the period 1994-2007. The results of our study suggest, that project finance has a significant positive effect on economic growth and therefore constitute an important source of financing in the selected set of countries. Additionally, the project sheds light on other factors of importance...

  17. Impacts of biogas projects on agro-ecosystem in rural areas-A case study of Gongcheng

    Institute of Scientific and Technical Information of China (English)

    Jin YANG; Weichao CHEN; Bin CHEN

    2011-01-01

    The rapid growth of agro-ecosystem has been the focus of "New Rural Construction" in China due to intensive energy consumption and environmental pollution in rural areas.As a kind of renewable energy,biogas is helpful for new energy development and plays an important role in the sustainable development of agroecosystem in China.To evaluate the effects of biogas on agro-ecosystem from a systematic angle,we discussed the status quo of household biogas and identified its main factors that may have impacts on agro-ecosystem.An indicator framework covering environmental,social and economic aspects was established to quantify the impacts exerted by biogas project on agro-ecosystem.A case study of Gongcheng was then conducted to evaluate the combined impact of biogas project using the proposed indicator framework.Results showed that there was a notable positive effect brought by the application of biogas,and the integrated benefit has been significantly improved by 60.36%,implying that biogas as a substitute energy source can promote the sustainable level of rural areas.

  18. Financing the clean development mechanism through debt-for-efficiency swaps? Case study evidence from a Uruguayan wind farm project

    DEFF Research Database (Denmark)

    Cassimon, Danny; Prowse, Martin; Essers, Dennis

    2011-01-01

    As one of Kyoto’s three flexibility mechanisms for reducing the cost of compliance, the Clean Development Mechanism (CDM) allows the issuance of Certified Emission Reduction (CER) credits from offset projects in non-Annex I countries. Whilst much attention has focused on the widespread use...... this through analysing the use of a debt swap between Uruguay and Spain within a CDM wind farm project in Uruguay. The paper assesses this transaction according to a simple framework by which debt swaps can be evaluated: whether it delivers additional resources to the debtor country and/or debtor government...

  19. Project management initiative local development through specialized training.

    Directory of Open Access Journals (Sweden)

    Neisy Ramos Acevedo

    2013-09-01

    Full Text Available The local development should complete a group of basic principles, such as: the design for training and the tools information adapted to the particularity of each territory. This training facilitates, also, the articulation of the stocks deployed by the local leaders, and it increases the administration of the knowledge and the transfer of technologies, processes in those that the nexuses are enlarged between the structures and the population, and where the participation of different present actors is potentialized in the territory. During the year 2010 the Ministry of Economy and Planning begins to offer the possibility to finance projects for the local development, nevertheless these initiatives should be accompanied by a rigorous study of feasibility of the investments. The University of Sancti Spíritus, committed in this zeal, designs the Diplomate of Administration of Projects for Local Initiatives, which offers theoretical tools and it develops practical abilities in the different actors of the local development that facilitate the realization of these studies. The exercise of this graduate's culmination consists on the defence of the study of feasibility of those projects that each municipality identifies as priority for its development.

  20. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  1. Impact of Requirements Elicitation Processes on Success of Information System Development Projects

    Directory of Open Access Journals (Sweden)

    Bormane Līga

    2016-12-01

    Full Text Available Requirements articulating user needs and corresponding to enterprise business processes are a key to successful implementation of information system development projects. However, the parties involved in projects frequently are not able to agree on a common development vision and have difficulties expressing their needs. Several industry experts have acknowledged that requirements elicitation is one of the most difficult tasks in development projects. This study investigates the impact of requirements elicitation processes on project outcomes depending on the applied project development methodology.

  2. Developing benefit schemes and financial compensation measures for fishermen impacted by marine renewable energy projects

    International Nuclear Information System (INIS)

    Reilly, Kieran; O’Hagan, Anne Marie; Dalton, Gordon

    2016-01-01

    Commercial fishermen are arguably the stakeholder group most likely to be directly impacted by the expansion of the marine renewable energy (MRE) sector. The potential opposition of fishermen may hinder the development of MRE projects and the provision of benefit schemes could to enhance acceptance. Benefit schemes refer to additional voluntary measures that are provided by a developer to local stakeholders. The aim of this study is to explore the issue of the provision of benefit packages to local fishing communities and financial compensation measures for fishermen who may be impacted by MRE projects. Semi-structured interviews were conducted with fourteen fishermen from three separate case study sites around the island of Ireland where MRE projects were being developed. In addition, ten company fisheries liaison officers (CFLOs) who have worked on MRE projects in the UK and Ireland were also interviewed. The interviews were analysed under the headings of local employment, benefits in kind, compensation and community funds and ownership of projects. Analysis shows that there is uncertainty among fishermen over whether they would benefit or gain employment from MRE. Provision of re-training schemes and preferential hiring practices could be used by MRE developers to reduce this uncertainty. There was also agreement between fishermen and CFLOs on the need for the provision of an evidence-base and a standard approach for the calculation of disruption payments. A formal structure for the provision of benefit schemes for fishermen would be useful. Furthermore, schemes that provide a range of benefits to fishermen and other stakeholders over the lifetime of a MRE project are more likely to be successful at enhancing acceptance. - Highlights: • There is uncertainty among fishermen over benefits from MRE projects. • Re-training is required for fishermen to avail of employment opportunities. • Evidence-base is required for calculation of disruption payments.

  3. A LOCAL DEVELOPMENT PROJECT IN THE FRAMEWORK OF PUBLIC POLICIES FOCUSED ON REGIONAL DEVELOPMENT STRATEGIES

    Directory of Open Access Journals (Sweden)

    George Schin

    2013-12-01

    Full Text Available This paper aims at outlining a successful implementation of a project within LEADER framework, which is a local development method which allows local actors to develop an area by using its endogenous development potential. After a brief presentation of the characteristics of regional development strategies in Romania, there were emphasized the objectives and activities encompassed in a local development plan, managed by the leaders of the local action group called ‘Vrancea County’. In order to reinforce the strengths of Vrancea County and implicitly to assure a sustainable development of this area from the South-East part of Romania, a LAG constituted through a partnership between public and private actors settled a set of priorities to be exploited by means of specific actions. The goal of this paper is to highlight these priorities, by integrating them in a project management approach. The paper concludes with specifications about how Microsoft Project software could support project management initiatives that will be developed by the LAG Vrancea County in the next period.

  4. Development of the Decommissioning Project Management System, DECOMMIS

    International Nuclear Information System (INIS)

    Chung, U. S.; Park, J. H.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B.

    2007-03-01

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The management of the projects can be defined as 'the decision of the changes of the decommissioning methodologies for the more efficient achievement of the project at an adequate time and to an improved method'. The correct decision comes from the experiences on the decommissioning project and the systematic experiences can be obtained from the good management of the decommissioning information. For this, a project management tool, DECOMMIS, was developed in the D and D Technology Division, which has the charge of the decommissioning projects at the KAERI, and its purpose was extended to following fields; generation of reports on the dismantling waste for WACID, record keeping for the next decommissioning projects of nuclear facilities, provision of fundamental data for the R and D of the decommissioning technologies

  5. A real option-based model for promoting sustainable energy projects under the clean development mechanism

    International Nuclear Information System (INIS)

    Lee, Hyounkyu; Park, Taeil; Kim, Byungil; Kim, Kyeongseok; Kim, Hyoungkwan

    2013-01-01

    The clean development mechanism (CDM) provides a way of assisting sustainable development in developing countries for developed countries to reduce greenhouse gas (GHG) emissions. Despite its intended benefits, the primary CDM market decreased from US$5.8 billion in 2006 to US$1.5 billion in 2010. One of the primary reasons for the reduction of market size is that developed countries as investors have a high level of risks caused by the volatility of the market price for certified emission reductions (CERs). Another issue to be resolved is that developing countries as host countries cannot claim any right to the CERs produced on their own land. This paper presents a real option-based model for both parties (developed and developing countries) to have their fair share of profits and risks by controlling the uncertainty associated with the future value of CERs. A case study illustrated that the proposed model can effectively attract investors to CDM projects leading to mitigation of climate change. - Highlights: ► This study focused on the risks associated with the uncertainty of future CER value in CDM projects. ► A real option-based model was developed for both parties in CDM to have fair share of profit and risk. ► Key variables and boundary conditions were identified for application of real option to CDM. ► The model allowed both parties to own options, which have an identical value. ► Hydropower plant projects in Indonesia were used to illustrate the implementation of the model

  6. Pre-feasibility study template for nZEB pilot projects development

    OpenAIRE

    Crespo Sánchez, Eva

    2015-01-01

    This document corresponds to Task 5.2 NZEB pilot projects development, Deliverable 5.2 Basic project conceptual design with feasibility analysis for eight pilot project of the SUSTAINCO project and should present a structure of pre-feasibility studies for eight NZEB projects implementation. It aims to give an overview of how SUSTAINCO project implementation is to be prepared and which technical and financial parameters to concern.

  7. DEVELOPING A BRAND MANTRA; CASE SIAM SAFARI

    OpenAIRE

    Sjöroos, Fia

    2016-01-01

    The purpose of this project is to point out the attributes and importance of a brand mantra. The objective of this project was to demonstrate the creation of a brand man-tra that ultimately the case company can benefit from. To get to this, this thesis co-vers the basics of marketing needed to understand the subject of brand mantra, which aspects to consider when creating a brand mantra and why would it be beneficial to take in use. In addition, this thesis represents the actual brand mantra ...

  8. KLIMAT: a Norwegian research project. Report from the banana case study

    Energy Technology Data Exchange (ETDEWEB)

    Svanes, Erik

    2012-07-01

    The 'KLIMAT' research project was a three year Norwegian research project financed by the Norwegian Research Council and partners. The project lasted from 1st of January 2009 to the 31st of August 2012. The partners were retailers Coop and Norgesgruppen, food producers Tine and Nortura and distributor and wholesaler BAMA. The research was carried out by Ostfold Research with advice from experts at UMB (University of environment and life sciences, Norway), food research institutes SIK (Sweden), MTT (Finland), and Aalborg University (Denmark).The aim of the project was to develop a standardized methodology for calculating Carbon Footprint of food products. 6 case products have been chosen, among them bananas. In the case of bananas BAMA and Dole Fresh Fruit were cooperating partners. This report contains a summary of the research carried out relating to the banana case and methodology development as well as results, discussions and conclusions. The results were planned to be published in an article in a peer-reviewed scientific magazine, other magazines and publications and in scientific conferences. Three scenarios were investigated, one German and one Norwegian scenario using 'pallet boat', i.e. boats where the product is transported on pallets, and one Norwegian scenario using container boats. All scenarios were Cradle to retail. In addition one cradle to grave scenario was calculated using pallet boats and end consumption in Norway. The total Carbon Footprint (CFP) of the product was found to be 0,78 kg Co2-eq/kg product using container transport, and 1,37 and 1,27 using pallet boats for Norway and Germany respectively. The main impact came from overseas transport, with the primary production and packaging coming next in importance. Primary production is dominated by direct emissions from landfill and soils. The production of ammonium nitrate fertilizer is also important. The largest contribution from overseas transport was emissions from

  9. Project-Based Social Justice Mathematics: A Case Study of Five 6th Grade Students

    Science.gov (United States)

    McHugh, Maighread L.

    2015-01-01

    The purpose of this qualitative multiple case study was to explore how five sixth grade female students navigated the process of project-based learning as they designed and implemented their own project centered on mathematics while using a social justice lens. The theoretical frameworks of Authentic Intellectual Work and Social Justice…

  10. Evaluation of a tuberculosis active case finding project in peri-urban areas, Myanmar: 2014-2016.

    Science.gov (United States)

    Aye, Sandar; Majumdar, Suman S; Oo, Myo Minn; Tripathy, Jaya Prasad; Satyanarayana, S; Kyaw, Nang Thu Thu; Kyaw, Khine Wut Yee; Oo, Nay Lynn; Thein, Saw; Thu, Myat Kyaw; Soe, Kyaw Thu; Aung, Si Thu

    2018-05-01

    We assessed the effect of an active case finding (ACF) project on tuberculosis (TB) case notification and the yields from a household and neigbourhood intervention (screening contacts of historical index TB patients diagnosed >24months ago) and a community intervention (screening attendants of health education sessions/mobile clinics). Cross-sectional analysis of project records, township TB registers and annual TB reports. In the household and neigbourhood intervention, of 56,709 people screened, 1,076 were presumptive TB and 74 patients were treated for active TB with a screening yield of 0.1% and a yield from presumptive cases of 6.9%. In the community intervention, of 162,881 people screened, 4,497 were presumptive TB and 984 were treated for active TB with a screening yield of 0.6% and yield from presumptive cases of 21.9%. Of active TB cases, 94% were new, 89% were pulmonary, 44% were bacteriologically-confirmed and 5% had HIV. Case notification rates per 100,000 in project townships increased from 142 during baseline (2011-2013) to 148 during intervention (2014-2016) periods. The yield from household and neigbourhood intervention was lower than community intervention. This finding highlights reconsidering the strategy of screening of contacts from historical index cases. Strategies to reach high-risk groups should be explored for future ACF interventions to increase yield of TB. Copyright © 2018 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  11. The Development of Digital Collections and Resources Organization Related Projects in Taiwan

    Directory of Open Access Journals (Sweden)

    Hsueh-Hua Chen

    2001-12-01

    Full Text Available With the development of Internet, digital libraries/museums have received worldwide attention and many developed countries are doing extensive researches on digital libraries/museums. In Taiwan, many institutions have digitized their rare collections. This paper introduces the recent development of digital projects in Taiwan, including: Digital Museum Project, National Digital Collection Project and National Culture Database Project, and also especially introduces some resources organization related projects. [Article content in Chinese

  12. Developing and implementing a monitoring programme: recommendations provided by the MODERN project

    International Nuclear Information System (INIS)

    Mayer, S.; Bergmans, A.; Garcia-Sineriz, J.L.; Breen, B.; Jobmann, M.

    2012-01-01

    countries and including 8 Waste Management Organizations, who joined their efforts since 2009, with the aim of developing a 'road-map to repository monitoring' by 2013. The MoDeRn project has addressed both the associated Process issues - why to monitor, how to develop a program, and how to use monitoring results - and Science and Technology issues - what to monitor, associated technical requirements and constraints, technology state-of-the-art, focused R and D and in-situ demonstrators. As the project nears its completion, some general guidance and recommendations are provided as part of a Monitoring Reference Framework to assist the development and implementation of a monitoring programme. More specifically, recommendations are provided on: - How to develop, establish and justify main motivations and objectives for monitoring; - How to develop and implement a realistic monitoring programme; and on - The relative importance different monitoring objectives may take in the decision making and governance of the disposal process. It should be noted that this reference framework explicitly acknowledges the need to place the development of a monitoring programme within its national context. Therefore, guidelines and recommendations emphasize those aspects that appear as useful to all national programmes and provide those specific recommendations that seem to be useful in a broad context. , Examples are provided by the projects three case studies carried out in crystalline (based on the Finnish/Swedish concept), sedimentary (based on the French concept) and evaporite (based on the German preliminary concept) host rocks. Furthermore, the project placed a specific attention on the societal implications of monitoring. A focused sociological study contributes to providing a better understanding of whether and how monitoring will contribute to enhancing confidence in and acceptance of the disposal process, as well as providing a basis for further, associated stakeholder engagement

  13. All projects related to | Page 30 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The highest numbers of dengue cases in Latin America in the last few years have occurred in Brazil, Colombia, and Mexico. Region: Brazil, Colombia, Mexico. Program: Food, Environment, and Health. Total Funding: CA$ 999,100.00. Preventing Zika disease with novel vector control approaches. Project. The highest ...

  14. The relationship between structured and free play in the development of a mentally handicapped child: a case study.

    Science.gov (United States)

    Hewson, S; McConkey, R; Jeffree, D

    1980-01-01

    This case study provides an individual illustration of the work of the Parental Involvement Project. A key feature of the approach used was the structured play situation. Thus, the case study also serves to demonstrate the role of structured play, and its relation to free play, in the development of a young, mentally handicapped child.

  15. The net effects of the Project NetWork return-to-work case management experiment on participant earnings, benefit receipt, and other outcomes.

    Science.gov (United States)

    Kornfeld, R; Rupp, K

    2000-01-01

    The Social Security Administration (SSA) initiated Project NetWork in 1991 to test case management as a means of promoting employment among persons with disabilities. The demonstration, which targeted Social Security Disability Insurance (DI) beneficiaries and Supplemental Security Income (SSI) applicants and recipients, offered intensive outreach, work-incentive waivers, and case management/referral services. Participation in Project NetWork was voluntary. Volunteers were randomly assigned to the "treatment" group or the "control" group. Those assigned to the treatment group met individually with a case or referral manager who arranged for rehabilitation and employment services, helped clients develop an individual employment plan, and provided direct employment counseling services. Volunteers assigned to the control group could not receive services from Project NetWork but remained eligible for any employment assistance already available in their communities. For both treatment and control groups, the demonstration waived specific DI and SSI program rules considered to be work disincentives. The experimental impact study thus measures the incremental effects of case and referral management services. The eight demonstration sites were successful in implementing the experimental design roughly as planned. Project NetWork staff were able to recruit large numbers of participants and to provide rehabilitation and employment services on a substantial scale. Most of the sites easily reached their enrollment targets and were able to attract volunteers with demographic characteristics similar to those of the entire SSI and DI caseload and a broad range of moderate and severe disabilities. However, by many measures, volunteers were generally more "work-ready" than project eligible in the demonstration areas who did not volunteer to receive NetWork services. Project NetWork case management increased average annual earnings by $220 per year over the first 2 years following

  16. Big Data Science Education: A Case Study of a Project-Focused Introductory Course

    Science.gov (United States)

    Saltz, Jeffrey; Heckman, Robert

    2015-01-01

    This paper reports on a case study of a project-focused introduction to big data science course. The pedagogy of the course leveraged boundary theory, where students were positioned to be at the boundary between a client's desire to understand their data and the academic class. The results of the case study demonstrate that using live clients…

  17. The Development of an Instrument to Measure the Project Competences of College Students in Online Project-Based Learning

    Science.gov (United States)

    Lin, Chien-Liang

    2018-01-01

    This study sought to develop a self-report instrument to be used in the assessment of the project competences of college students engaged in online project-based learning. Three scales of the KIPSSE instrument developed for this study, namely, the knowledge integration, project skills, and self-efficacy scales, were based on related theories and…

  18. Professor Eric Can't See: A Project-Based Learning Case for Neurobiology Students.

    Science.gov (United States)

    Ogilvie, Judith Mosinger; Ribbens, Eric

    2016-01-01

    "Professor Eric Can't See" is a semi-biographical case study written for an upper level undergraduate Neurobiology of Disease course. The case is integrated into a unit using a project-based learning approach to investigate the retinal degenerative disorder Retinitis pigmentosa and the visual system. Some case study scenes provide specific questions for student discussion and problem-based learning, while others provide background for student inquiry and related active learning exercises. The case was adapted from "'Chemical Eric' Can't See," and could be adapted for courses in general neuroscience or sensory neuroscience.

  19. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  20. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  1. Indigenous Environmental Education: The Case of Renewable Energy Projects

    Science.gov (United States)

    Lowan-Trudeau, Gregory

    2017-01-01

    This article presents insights from an inquiry into renewable energy development by Indigenous communities across Canada. The focus is on Indigenous leadership in developing renewable energy projects that align with traditional ecological philosophies while also providing increased economic and energy security, sovereignty, and educational…

  2. The SIMRAND methodology - Simulation of Research and Development Projects

    Science.gov (United States)

    Miles, R. F., Jr.

    1984-01-01

    In research and development projects, a commonly occurring management decision is concerned with the optimum allocation of resources to achieve the project goals. Because of resource constraints, management has to make a decision regarding the set of proposed systems or tasks which should be undertaken. SIMRAND (Simulation of Research and Development Projects) is a methodology which was developed for aiding management in this decision. Attention is given to a problem description, aspects of model formulation, the reduction phase of the model solution, the simulation phase, and the evaluation phase. The implementation of the considered approach is illustrated with the aid of an example which involves a simplified network of the type used to determine the price of silicon solar cells.

  3. Theoretical background to orient the universitary projects management to local development.

    Directory of Open Access Journals (Sweden)

    Naybi Salas Vargas

    2012-03-01

    Full Text Available Nowadays the resources administration is a problem to be solved, and is remarkable the universities role to orient knowledge to the expected local development. With the communion of the university and the main decisors at local and territorial contexts, it is evident the development of alternatives that diminish existing breaches in the known projects management Anytime the projects development context is diverse and multicultural, all the knowledge elements that provide new forms are useful experiences without point out unique recipees. The development dynamic evolution in the territories continues being an urgency for human survival.The projects management, notable in international cooperation actions as the international dimension of the extensionist activity and in the science contributions, are reduced in their foccus to the promotion of local development, what points out the need to orient the universitary processes to the territorial development of the province, in particular the projects management. The objective of this work is to offer a guidance of foundations that allow to orient the management of universtary projects to local development.

  4. Development of the Decommissioning Project Management System, DECOMMIS

    Energy Technology Data Exchange (ETDEWEB)

    Chung, U. S.; Park, J. H.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B

    2007-03-15

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The management of the projects can be defined as 'the decision of the changes of the decommissioning methodologies for the more efficient achievement of the project at an adequate time and to an improved method'. The correct decision comes from the experiences on the decommissioning project and the systematic experiences can be obtained from the good management of the decommissioning information. For this, a project management tool, DECOMMIS, was developed in the D and D Technology Division, which has the charge of the decommissioning projects at the KAERI, and its purpose was extended to following fields; generation of reports on the dismantling waste for WACID, record keeping for the next decommissioning projects of nuclear facilities, provision of fundamental data for the R and D of the decommissioning technologies.

  5. The weaknesses of China's contractors in overseas construction project management: 2 case studies

    Directory of Open Access Journals (Sweden)

    Ph. D. Mo Xuan

    2012-05-01

    Full Text Available The practices of international construction contracting have been prevalent increasingly over the past half a centuru, Altough the contractors of highly developed world have dominated this field, there tends to be more players from newly emerging countries like China. The history of China's contractors performing in the overseas construction markets is divided into 3 major phases, namely the planning economy era, reform and openness perios and the latest nwe millennium. However, the know-how and techniques of modern project management have been widely deployed in China for merely 2 decades. While competing with those veterans in overseas markets, China's contractors still lack adequate advantages as well as experiences, leading to the underperformance or even failures. A 2-dimension framework of overseas project management, comprising the external risk and internal function aspects , is proposed. Based on the analysis of 2 recent cases in Saudi Arabia an Poland respectively, it's foung that the low cost strategy management in risk, commerce, cost, human resources, etc. are their fatal weaknesses.

  6. Developing a rural transitional care community case management program using clinical nurse specialists.

    Science.gov (United States)

    Baldwin, Kathleen M; Black, Denice; Hammond, Sheri

    2014-01-01

    This quality improvement project developed a community nursing case management program to decrease preventable readmissions to the hospital and emergency department by providing telephonic case management and, if needed, onsite assessment and treatment by a clinical nurse specialist (CNS) with prescriptive authority. As more people reach Medicare age, the number of individuals with worsening chronic diseases with dramatically increases unless appropriate disease management programs are developed. Care transitions can result in breakdown in continuity of care, resulting in increased preventable readmissions, particularly for indigent patients. The CNS is uniquely educated to managing care transitions and coordination of community resources to prevent readmissions. After a thorough SWOT (strengths, weaknesses, opportunities, and threats) analysis, we developed and implemented a cost-avoidance model to prevent readmissions in our uninsured and underinsured patients. The project CNS used a wide array of interventions to decrease readmissions. In the last 2 years, there have been a total of 22 less than 30-day readmissions to the emergency department or hospital in 13 patients, a significant decrease from readmissions in these patients prior to the program. Three of them required transfer to a larger hospital for a higher level of care. Using advanced practice nurses in transitional care can prevent readmissions, resulting in cost avoidance. The coordination of community resources during transition from hospital to home is a job best suited to CNSs, because they are educated to work within organizations/systems. The money we saved with this project more than justified the cost of hiring a CNS to lead it. More research is needed into this technology. Guidelines for this intervention need to be developed. Replicating our cost-avoidance transitional care model can help other facilities limit that loss.

  7. Sustainable Development for Whom and How? Exploring the Gaps between Popular Discourses and Ground Reality Using the Mexican Jatropha Biodiesel Case

    Science.gov (United States)

    Banerjee, Aparajita; Halvorsen, Kathleen E.; Eastmond-Spencer, Amarella; Sweitz, Sam R.

    2017-06-01

    In the last decade, jatropha-based bioenergy projects have gotten significant attention as a solution to various social, economic, and environmental problems. Jatropha's popularity stemmed out from different discourses, some real and some perceived, in scientific and non-scientific literature. These discourses positioned jatropha as a crop helpful in producing biodiesel and protecting sustainability by reducing greenhouse gas emissions compared to fossil fuels and increasing local, rural development by creating jobs. Consequently, many countries established national policies that incentivized the establishment of jatropha as a bioenergy feedstock crop. In this paper, we explore the case of jatropha bioenergy development in Yucatan, Mexico and argue that the popular discourse around jatropha as a sustainability and rural development tool is flawed. Analyzing our results from 70 semi-structured interviews with community members belonging to a region where plantation-scale jatropha projects were introduced, we found that these projects did not have many significant social sustainability benefits. We conclude from our case that by just adding bioenergy projects cannot help achieve social sustainability in rural areas alone. In ensuring social sustainability of bioenergy projects, future policymaking processes should have a more comprehensive understanding of the rural socioeconomic problems where such projects are promoted and use bioenergy projects as one of the many solutions to local problems rather than creating such policies based just on popular discourses.

  8. Sustainable Development for Whom and How? Exploring the Gaps between Popular Discourses and Ground Reality Using the Mexican Jatropha Biodiesel Case.

    Science.gov (United States)

    Banerjee, Aparajita; Halvorsen, Kathleen E; Eastmond-Spencer, Amarella; Sweitz, Sam R

    2017-06-01

    In the last decade, jatropha-based bioenergy projects have gotten significant attention as a solution to various social, economic, and environmental problems. Jatropha's popularity stemmed out from different discourses, some real and some perceived, in scientific and non-scientific literature. These discourses positioned jatropha as a crop helpful in producing biodiesel and protecting sustainability by reducing greenhouse gas emissions compared to fossil fuels and increasing local, rural development by creating jobs. Consequently, many countries established national policies that incentivized the establishment of jatropha as a bioenergy feedstock crop. In this paper, we explore the case of jatropha bioenergy development in Yucatan, Mexico and argue that the popular discourse around jatropha as a sustainability and rural development tool is flawed. Analyzing our results from 70 semi-structured interviews with community members belonging to a region where plantation-scale jatropha projects were introduced, we found that these projects did not have many significant social sustainability benefits. We conclude from our case that by just adding bioenergy projects cannot help achieve social sustainability in rural areas alone. In ensuring social sustainability of bioenergy projects, future policymaking processes should have a more comprehensive understanding of the rural socioeconomic problems where such projects are promoted and use bioenergy projects as one of the many solutions to local problems rather than creating such policies based just on popular discourses.

  9. THE DYNAMICS OF PROJECT-BASED LEARNING EXTENSION COURSES: THE “LABORATORY OF SOCIAL PROJECTS” CASE STUDY

    Directory of Open Access Journals (Sweden)

    Joao Alberto Arantes do Amaral

    2017-01-01

    Full Text Available In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, “Laboratory of Social Projects.” The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of São Paulo (Unifesp, Osasco Campus, Brazil. The course had 72 participants (41 community members and 31 university students. The participants worked in teams of four members (on average and developed 13 projects on behalf of eight NGOs that help people in need. In our research, we followed a mixed methods approach, using unstructured questionnaires and project reports as sources of information. We made use of system thinking analysis to reveal the dynamics that unfolded during the course. Our main findings are: 1 free-of-charge extension courses can be much more challenging to manage than traditional courses; the bureaucracy of getting the university’s approval and problems related to dropouts are issues to consider; 2 the workload of the professors involved can be substantially higher than the workload of similar regular courses; 3 the use of project-based learning techniques can be very effective; 4 the courses can provide a very rich experience to the participants, promoting intense knowledge-sharing among all involved.

  10. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  11. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  12. Energy: options for the future. Curriculum development project for high school teachers. Final report. [Packet

    Energy Technology Data Exchange (ETDEWEB)

    Carroll, T.O.

    1978-04-01

    Recent state and regional energy crises demonstrate the delicate balance between energy systems, the environment, and the economy. Indeed, the interaction between these three elements of society is very complex. This project develops curriculum materials that would better provide students with an understanding and awareness of fundamental principles of energy supply, conversion processes, and utilization now and in the future. The project had two specific objectives: to transfer knowledge of energy systems, analysis techniques, and advanced technologies from the energy analyst community to the teacher participants; and to involve teachers in the preparation of modular case studies on energy issues for use within the classroom. These curriculum modules are intended to enhance the teacher's ability to provide energy-related education to students within his or her own academic setting. The project is organized as a three-week summer program, as noted in the flyer (Appendix A). Mornings are spent in seminars with energy and environmental specialists (their handout lecture notes are included as Appendix B); afternoons are devoted to high school curriculum development based on the seminar discussions. The curriculum development is limited to five areas: conservation, electricity demand scheduling, energy in the food system, new technologies (solar, wind, biomass), and environment. Appendix C consists of one-day lession plans in these areas.

  13. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  14. Financing Build, Operate and Transfer (BOT) Projects: The Case of Islamic Instruments

    OpenAIRE

    Khan, Tariqullah

    2002-01-01

    Several member countries of the Islamic Development Bank have embarked upon a program of developing and maintaining infrastructure projects by the private sector in the framework of build operate and transfer (BOT) mechanism and its various variants. The present paper reviews these experiences and the peculiar risks associated with investments in these projects as compared to the risks of traditional manufacturing sector and offers a framework for Islamic instruments to finance BOT projects.

  15. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    Energy Technology Data Exchange (ETDEWEB)

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  16. Toward an effective implementation of clean development mechanism projects in China

    International Nuclear Information System (INIS)

    Zhang Zhongxiang

    2006-01-01

    With the already huge and growing amount of greenhouse gas emissions and a great deal of low-cost abatement options available, China is widely expected as the world's number one host country of clean development mechanism (CDM) projects. But, making this potential a reality represents a significant challenge for China, because there has been a general lack of awareness by both the Chinese government and business communities, clear institutional structure, and implementation strategy. This has raised great concern about China's ability to compete internationally for CDM projects and exploit fully its CDM potential. This paper aims to address how CDM projects will be effectively implemented in China by examining the major CDM capacity building projects in China with bilateral and multilateral donors, the treatment of low-cost, non-priority CDM projects, and how a system for application, approval, and implementation of CDM projects is set up in China and what roles the main institutional actors are going to play in the system. We conclude that these capacity building assistances, the establishment of streamlined and transparent CDM procedures and sound governance, and the lessons learned and experience gained from the implementation of the CDM project in Inner Mongolia and the two Prototype Carbon Fund' projects will help China to take advantage of CDM opportunities. Moreover, in order to further capitalize on its CDM potential, there is a pressing need for the Chinese government to amend its current interim CDM regulations, in particular those controversial provisions on the eligibility to participate in CDM projects in China and the distribution of the revenues derived from CDM project between the project developer and the Chinese government. We believe that taking these capacity building projects and the recommended actions to clearly define the sustainable development objective of the CDM and disseminate CDM knowledge to local authorities and project developers as

  17. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  18. Generation project development opportunities in Latin America

    International Nuclear Information System (INIS)

    Carter, R.W.

    1993-01-01

    This presentation addresses the pitfalls and benefits of developing power generation projects in Latin America. The topics of the presentation include the countries where there is opportunity for development, the opportunities that exist in these countries, the influence of geographic proximity, and competition from the Far East and the European Community

  19. Case Studies for Management Development in Bangladesh. Fourth Book. Parepared for the World Bank/Bangladesh Management Education and Training Project.

    Science.gov (United States)

    McLean, Gary N.

    This document contains five case studies of management and finance situations in Bangladesh, which are intended to foster classroom discussion and thereby advance management development in that country. One to four discussion questions follow each case study. The titles and authors of the case studies on management are: "Azir Ahmed & Co.,…

  20. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  1. [Anthropology and oral health projects in developing countries].

    Science.gov (United States)

    Grasveld, A E

    2016-01-01

    The mouth and teeth play an important role in social interactions around the world. The way people deal with their teeth and mouth, however, is determined culturally. When oral healthcare projects are being carried out in developing countries, differing cultural worldviews can cause misunderstandings between oral healthcare providers and their patients. The oral healthcare volunteer often has to try to understand the local assumptions about teeth and oral hygiene first, before he or she can bring about a change of behaviour, increase therapy compliance and make the oral healthcare project sustainable. Anthropology can be helpful in this respect. In 2014, in a pilot project commissioned by the Dutch Dental Care Foundation, in which oral healthcare was provided in combination with anthropological research, an oral healthcare project in Kwale (Kenia) was evaluated. The study identified 6 primary themes that indicate the most important factors influencing the oral health of school children in Kwale. Research into the local culture by oral healthcare providers would appear to be an important prerequisite to meaningful work in developing countries.

  2. Environmental impacts of dispersed development from federal infrastructure projects.

    Science.gov (United States)

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  3. Marginal Productivity Gained Through Prefabrication: Case Studies of Building Projects in Auckland

    Directory of Open Access Journals (Sweden)

    Wajiha Shahzad

    2015-02-01

    Full Text Available Several studies have documented benefits of prefabrication system (prefab compared to the traditional building system (TBS. However, the documented benefits have been anecdotal or fragmented with reports of isolated case study projects. Few studies have looked at the objectively quantified benefits from statistical significance point of view and across building types in New Zealand. This study contributes to filling this knowledge gap by analyzing cost and time-savings, and productivity improvement achievable by the use of prefab in place of the TBS. Records of completion times and final contract values of 66 building projects implemented using prefab in Auckland were collected. The building types included commercial, houses, apartments, educational, and community buildings. The project details included final contract sums, completion dates, gross floor areas, and number of floors. Based on these details, the equivalent completion times and the final cost estimates for similar buildings implemented using the TBS were obtained from the Rawlinsons construction data handbook and feedback from some designers and contractors. Marginal productivity outcome for each building project was computed as the product of the cost and time-savings achieved using the prefab. Results showed that the use of prefab in place of TBS resulted in 34% and 19% average reductions in the completion times and costs, respectively. This also translated to overall 7% average improvement in the productivity outcomes in the building projects. Univariate ANOVA-based hypothesis test results showed that ‘building type’ had no significant effects on the cost and productivity improvement outcomes, but had significant effect on the time savings analyzed in the case study projects. The greatest productivity gain of 11% was achieved in house projects. These evidence-based results could guide optimized use of prefab for specific building application. The hypothesis-testing outcome

  4. Development of Export Control Comprehensive Management Model for Nuclear Power Plants and Others Projects

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chansuh; Seo, Hana; Choi, Sundo [Korea Institute of Nuclear Nonproliferation And Control, Daejeon (Korea, Republic of)

    2014-05-15

    It is required that there are lots of managements of care and concern if the project contains strategic items such as NPPs. The Korean nuclear industry and its related companies, such as the Korea Hydro and Nuclear Power (KHNP), are promoting greater exports of NPPs. It is likely that Korea will export more this technology to newcomer states in the future. As a result, the ROK has been improving its export control management system for NPPs. In keeping with this national effort, Korea Institute of Nuclear Nonproliferation And Control (KINAC) developed comprehensive export control management model for NPPs and other projects, in preparation for this projected growth in the industry. This model also applies to the nuclear export case of the UAE, aims to manage the project from bidding to the end of the contract. The recent Export Licensing of Nuclear Facility Technology was reflected in the Notice on Export and Import of Strategic Items in January 2014. Through this license, the large-scale project legislation framework was established. It can also minimize nonproliferation concerns of the international community through strict management. It is expected that the Korea will be able to enhance transparency and secure the nuclear use, while meeting nonproliferation purpose.

  5. Development of Export Control Comprehensive Management Model for Nuclear Power Plants and Others Projects

    International Nuclear Information System (INIS)

    Lee, Chansuh; Seo, Hana; Choi, Sundo

    2014-01-01

    It is required that there are lots of managements of care and concern if the project contains strategic items such as NPPs. The Korean nuclear industry and its related companies, such as the Korea Hydro and Nuclear Power (KHNP), are promoting greater exports of NPPs. It is likely that Korea will export more this technology to newcomer states in the future. As a result, the ROK has been improving its export control management system for NPPs. In keeping with this national effort, Korea Institute of Nuclear Nonproliferation And Control (KINAC) developed comprehensive export control management model for NPPs and other projects, in preparation for this projected growth in the industry. This model also applies to the nuclear export case of the UAE, aims to manage the project from bidding to the end of the contract. The recent Export Licensing of Nuclear Facility Technology was reflected in the Notice on Export and Import of Strategic Items in January 2014. Through this license, the large-scale project legislation framework was established. It can also minimize nonproliferation concerns of the international community through strict management. It is expected that the Korea will be able to enhance transparency and secure the nuclear use, while meeting nonproliferation purpose

  6. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  7. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  8. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  9. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  10. Design for sustainability: Countering the drivers of unsustainability in development projects

    CSIR Research Space (South Africa)

    Marais, Mario A

    2015-11-01

    Full Text Available The vast majority of development projects, and in particular Information and Communications Technology for Development (ICT4D) projects, fail to reach their objectives and only a small number of projects effect change that lasts... of the beneficiary system, and to meet the system at the current point in its development path. It may call for the development of modular interventions, parts of which can be rolled out as and when the system is ready for the adoption thereof. Is Current Change...

  11. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  12. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  13. MODELS OF AND APPROACHES TO MANAGEMENT OF REAL ESTATE DEVELOPMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2012-12-01

    Full Text Available The authors argue that globalization and the system-wide crisis jointly produce a strong impact onto real estate (RE development projects. As a result, intensive alterations in RE project development patterns have converted into a new trend of the present-day investment and construction industry. Therefore, alterations in the area of real estate management cause numerous problems. By virtue of this article, the authors make an attempt to provide their answer to the question whether it is possible to achieve such a sophisticated level of project management in the real estate development industry, so that project-related decisions encompassed supplementary potential opportunities in terms of social, economic and public development. Towards this end, the new concept of real estate development is proposed and the system of priorities has been developed. This concept is believed to enable all players of the construction market to make higher quality decisions at early stages of RE development projects. Besides, a lot of attention is driven to the term "potential of a construction facility", that is regarded as a set of yet unimplemented opportunities for improvements of the construction facility performance as a commercial and social vehicle.

  14. The NEED (National Energy Education Development) Project

    Science.gov (United States)

    Hogan, D.; Spruill, M.

    2012-04-01

    The NEED (National Energy Education Development) Project is a non-profit organization which provides a wide range of K-12 curriculum on energy education topics. The curriculum is specific for primary, elementary, intermediate and secondary levels with age appropriate activities and reading levels. The NEED Project covers a wide range of topics from wind energy, nuclear energy, solar energy, hydropower, hydrogen, fossil fuels, energy conservation, energy efficiency and much more. One of the major strengths of this organization is its Teacher Advisory Board. The curriculum is routinely revised and updated by master classroom teachers who use the lessons and serve on the advisory board. This ensures it is of the highest quality and a useful resource. The NEED Project through a variety of sponsors including businesses, utility companies and government agencies conducts hundreds of teacher professional development workshops each year throughout the United States and have even done some workshops internationally. These workshops are run by trained NEED facilitators. At the workshops, teachers gain background understanding of the energy topics and have time to complete the hands on activities which make up the curriculum. The teachers are then sent a kit of equipment after successfully completing the workshop. This allows them to teach the curriculum and have their students perform the hands on labs and activities in the classroom. The NEED Project is the largest provider of energy education related curriculum in the United States. Their efforts are educating teachers about energy topics and in turn educating students in the hope of developing citizens who are energy literate. Many of the hands on activities used to teach about various energy sources will be described and demonstrated.

  15. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  16. PUREX transition project case study

    International Nuclear Information System (INIS)

    Jasen, W.G.

    1996-01-01

    In December 1992, the US Department of Energy (DOE) directed that the Plutonium-Uranium Extraction (PUREX) Plant be shut down and deactivated because it was no longer needed to support the nation's production of weapons-grade plutonium. The PUREX/UO 2 Deactivation Project will establish a safe and environmentally secure configuration for the facility and preserve that configuration for 10 years. The 10-year span is used to predict future maintenance requirements and represents the estimated time needed to define, authorize, and initiate the follow-on decontamination and decommissioning activities. Accomplishing the deactivation project involves many activities. Removing major hazards, such as excess chemicals, spent fuel, and residual plutonium are major goals of the project. The scope of the PUREX Transition Project is described within

  17. Case Study of the NENE Code Project

    National Research Council Canada - National Science Library

    Kendall, Richard; Post, Douglass; Mark, Andrew

    2007-01-01

    ...) Program is sponsoring a series of case studies to identify the life cycles, workflows, and technical challenges of computational science and engineering code development that are representative...

  18. The Ranger project - a case study

    International Nuclear Information System (INIS)

    Young, R.I.

    1983-01-01

    Ranger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3000 tonne/yr of U 3 O 8 from 3500 tonne/day of mill feed. The construction of the project was completed in 1981. Wright-Davy were the project managers and designers of the $270 million ore treatment plant and associated infrastructure. Details of project cost, staffing, project design and project systems are given

  19. methanization of organic matters. Guide for project developers

    International Nuclear Information System (INIS)

    2015-02-01

    This document aims at informing potential project developers (farmers, local communities, industrials) all along the creation of a methanization unit. It precisely indicates administrative procedures required to complete a project. It first presents some generalities about methanization (matters and their performance, methanization cycle, biogas), describes methanization processes (dry and humid), and valorisation processes (co-generation, hot water production, gas injection into the public network), presents digestate characteristics, and discusses benefits and drawbacks of methanization. The different steps of a project management are then analysed. Additional procedures are indicated, and risks and traps of methanization projects are highlighted. The document comes along with a large number of appendices which can be documents released by professional or public bodies

  20. Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

    Science.gov (United States)

    Khadem, Mohammad Miftaur Rahman Khan; Piya, Sujan; Shamsuzzoha, Ahm

    2017-09-01

    The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert's opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project's on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.

  1. The Thai-Canadian nuclear human resources development linkage project

    International Nuclear Information System (INIS)

    Sumitra, Tatchai; Chankow, Nares; Bradley, K.; Bereznai, G.

    1998-01-01

    The Thai-Canadian Nuclear Human Resources Development Linkage Project (the P roject ) was initiated in 1994 in order to develop the engineering and scientific expertise needed for Thailand to decide whether and how the country can best benefit from the establishment of a nuclear power program. The Project was designed to upgrade current academics and people in industry, and to develop an adequate supply of new technical personnel for academic, industry, utility, regulatory and other government institutions. The key Project objectives included the establishment of a Chair in Nuclear Engineering at Chulalongkorn University, the upgrading of the current Masters level curriculum, the establishment of undergraduate and doctorate level curricula, development and delivery of an industrial training program for people in industry and government, exchanges of Thai and Canadian academics and industry experts to establish common research programs and teaching interests, and a public education program that was to test in Thailand some of the techniques that have been successfully used in Canada. (author)

  2. All projects related to | Page 118 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Strengthening the Evidence Base for Open Government in Developing Countries. Project. The Open Government Partnership (OGP) is an ... Project. Despite growing philanthropy in emerging economies, there are significant data gaps on amounts and sources. Topic: POLICY MAKING, REGULATIONS, HUMANITARIAN ...

  3. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  4. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  5. The anatomy and importance of project finance for oil and gas developments

    International Nuclear Information System (INIS)

    Whyatt, A.S.

    1992-01-01

    This paper reports that project financing can be of great benefit to oil and gas projects because by separately identifying and securing assets and cashflows it can provide large sums not otherwise accessible to whole projects or to individual companies. Project financing is of interest to members of the SPE because it routinely requires the expertise of petroleum engineers and other professionals to vouch for the viability of petroleum projects and the recoverability of reserves. its essential attraction is that risk analysis and the application of precise professional criteria enable large projects and amounts to be financed, which otherwise might not occur. This is particularly the case when there are a number of participants in a large project, none of which is on its own able to support the finance. The growth in the average size of projects means that an increasing number of projects must be financed in this way or not be able to go forward

  6. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  7. Future development of project management competences.

    NARCIS (Netherlands)

    Silvius, A.J.G.; Batenburg, R.

    2009-01-01

    This paper describes a study into the expected development of the competences of the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  8. Impacts of biogas projects on agro-ecosystem in rural areas — A case study of Gongcheng

    Science.gov (United States)

    Yang, Jin; Chen, Weichao; Chen, Bin

    2011-09-01

    The rapid growth of agro-ecosystem has been the focus of "New Rural Construction" in China due to intensive energy consumption and environmental pollution in rural areas. As a kind of renewable energy, biogas is helpful for new energy development and plays an important role in the sustainable development of agro-ecosystem in China. To evaluate the effects of biogas on agro-ecosystem from a systematic angle, we discussed the status quo of household biogas and identified its main factors that may have impacts on agro-ecosystem. An indicator framework covering environmental, social and economic aspects was established to quantify the impacts exerted by biogas project on agro-ecosystem. A case study of Gongcheng was then conducted to evaluate the combined impact of biogas project using the proposed indicator framework. Results showed that there was a notable positive effect brought by the application of biogas, and the integrated benefit has been significantly improved by 60.36%, implying that biogas as a substitute energy source can promote the sustainable level of rural areas.

  9. Analyzing the contributions of a government-commissioned research project: A case study

    NARCIS (Netherlands)

    Hegger, I.; Janssen, S.W.J.; Keijsers, J.F.E.M.; Schuit, A.J.; Oers, H.A.M. van

    2014-01-01

    Background: It often remains unclear to investigators how their research contributes to the work of the commissioner. We initiated the 'Risk Model' case study to gain insight into how a Dutch National Institute for Public Health and the Environment (RIVM) project and its knowledge products

  10. INFLUENCES ON ORGANISATIONAL SLACK IN NEW PRODUCT DEVELOPMENT PROJECTS

    OpenAIRE

    ANDERS RICHTNÉR; PÄR ÅHLSTRÖM

    2006-01-01

    Programs to decrease cost and to increase operational efficiency may reduce a company's ability to innovate, by reducing organisational slack. Previous research on the relationship between organisational slack and innovation has been at level of the firm and has neglected the processes underlying the relationship, which takes place at the level of product development projects. In this paper, we identify organisational slack and its influences at the level of the product development project. T...

  11. ASRM case insulation design and development

    Science.gov (United States)

    Bell, Matthew S.; Tam, William F. S.

    1992-10-01

    This paper describes the achievements made on the Advanced Solid Rocket Motor (ASRM) case insulation design and development program. The ASRM case insulation system described herein protects the metal case and joints from direct radiation and hot gas impingement. Critical failure of solid rocket systems is often traceable to failure of the insulation design. The wide ranging accomplishments included the development of a nonasbestos insulation material for ASRM that replaced the existing Redesigned Solid Rocket Motor (RSRM) asbestos-filled nitrile butadiene rubber (NBR) along with a performance gain of 300 pounds, and improved reliability of all the insulation joint designs, i.e., segmented case joint, case-to-nozzle and case-to-igniter joint. The insulation process development program included the internal stripwinding process. This process advancement allowed Aerojet to match to exceed the capability of other propulsion companies.

  12. Resource-constrained project scheduling problem: review of past and recent developments

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  13. Organizational Diagnosis in Project-Based Companies

    Directory of Open Access Journals (Sweden)

    Behrouz Zarei

    2014-05-01

    Full Text Available The purpose of this article is to develop a new method for corporate diagnosis (CD. To this end, a method is developed for the diagnosis process of project-based companies. The article presents a case study in a large company where data have been collected through focus groups. Project delay, high project cost, and low profitability are examples of project deficiency in project-based companies. Such issues have made managers pay special attention to find effective solutions to improve them. Prominent factors are inappropriate strategy, structure, system, human resource management, and PMBOK(Project Management Body of Knowledge processes. Thus, CD and analysis is an important task in improvement of corporate performance. The CD model that is developed in this article could be used for project-based companies. The proposed method can be used for CD in any project-based company. This article provides an emphatic application of CD as a prerequisite for restructuring in project-based companies.

  14. Leading Change: A Case Study of Leadership Practices from the Development of the Niagara County Community College Culinary Institute

    Science.gov (United States)

    Caton, Jazmin; Mistriner, Mark

    2016-01-01

    The purpose of this case study was to evaluate the lessons learned from the development of a project that set out to revitalize an economically depressed area with an innovative approach to workforce development through partnerships. The focus was to utilize the development of the Niagara County Community College Culinary Institute as an example…

  15. Scenario Development and Delphi Application in Life Cycle Assessment for Assessing Environmental Impact of New Technology Case Study: Removal of Wind Turbines Project

    Directory of Open Access Journals (Sweden)

    Devina Fitrika Dewi

    2016-05-01

    Full Text Available Certain technology is intended to create eco-efficient products or process or is developed as answer to the recent challenge. This kind of technology consequently can also create another impact therefore it shall be assessed and analyzed.The focus of the study is on assessment method namely Life Cycle Analysis (LCA, Scenario development and Delphi application. The objective is to understand benefits and drawbacks of the combined methodology and observe practicality of its implementation for assessing new technology. The distinctive feature comes from the combination of social and technological foresight (as Delphi application and future studies (as Scenario development which are applied in the environmental assessment of a product (by Life Cycle Analysis.The utilization of LCA-Scenario-Delphi case study as an explanatory example is presented in the Removal Wind Turbines Project by the Danish Energy Agency. The wind turbine is considered new technology with some of it phases are yet to occur, for example: removal of turbines after phase out stage. Technology Assessment by LCA-Scenario-Delphi is complicated procedure, but necessary to validate the results. The drawbacks of this procedure are extensive time it consumes and the dependency on public participation and/or expert willingness to participate. Nonetheless, its advantages are due to its interactive feature; integration of knowledge from different areas of expertise and its assessment’s characteristic which focuses on process.

  16. Implementation of an education development project in pathology to improve student competency-lessons learnt.

    Science.gov (United States)

    Negi, Gita; Harsh, Meena; Chauhan, Vijendra D; Kalra, Vinita; Agarwal, Pradeep; Kusum, Anuradha

    2015-08-01

    Basic medical sciences and clinical teachings are not coordinated in the present medical education system. They are not taught keeping in mind the outcomes required at the time of actual handling of patients in the community. An educational development project was implemented in the Department of Pathology with the aim that it will result in the student learning to link the pathophysiology of the disease to clinical scenarios and become fully competent for lifelong medical practice. The pathology teaching of the second professional batch was modified by starting with defining the desired outcomes/competencies in the student's knowledge, skills, and attitude which were then addressed by lectures, demonstrations, practical classes and small group activities where case scenarios and laboratory reports were included. The outcome was assessed by Objectively Structured Clinical/Practical Examination and multiple choice questions. Force field analysis, faculty and student interviews, and questionnaires were used to assess the factors affecting its implementation and impact. Totally 80 students of the 2(nd) Professional MBBS were exposed to a competency-based education development project. It was found that the system was appreciated by faculty and students, especially the integration with clinical scenarios. There were many factors which influenced the execution of this program, including motivation level of students and faculty, time, logistics and meticulous planning. There was a significant improvement in student's performance and satisfaction. Many factors including prior planning were a major determinant for the success of this education development project.

  17. Uncovering opportunity of low-carbon city promotion with industrial system innovation: Case study on industrial symbiosis projects in China

    International Nuclear Information System (INIS)

    Dong, Liang; Gu, Fumei; Fujita, Tsuyoshi; Hayashi, Yoshitsugu; Gao, Jie

    2014-01-01

    There is a dilemma for rapid industrializing China to balance economic growth and low carbonization. Industrial symbiosis (IS) provides a system innovation to utilize the industry to fight climate change and pursue sustainable urban development, while few attentions are paid in literatures. Under this circumstance, this study reviews the low-carbon city practice in China and conducts a case study to calculate the CO 2 emissions reduction potential under promoting IS projects in two cities of China, named Jinan and Liuzhou. With the real national project in Jinan as advanced example, new scenarios related to IS are designed for Liuzhou, including comprehensive energy network, waste plastics recycling, scrap tires recycling and flying ash recycling. The material/waste and energy exchange is quantified in the IS network, as well as the related environmental benefit. The material/energy exchange is over 10 million ton and 20 thousands tce in Jinan's case, and 2.5 million ton and 45 thousand tce in Liuzhou's case. Results highlight that IS could effectively reduce CO 2 emissions. The total reduction potential amounts to 3944.05 thousands tCO 2 /year and 2347.88 thousands tCO 2 /year in Jinan and Liuzhou. Finally, policy implications on the ever-improvement of industrial symbiosis and China's sustainable urban development are proposed and discussed. - Highlights: • Investigate two real industrial symbiosis projects in Jinan and Liuzhou of China. • Quantify the material exchange and the CO 2 reduction potential of the IS network. • CO 2 reduction potential is 3944.05 and 2347.88 ktCO 2 /year in Jinan and Liuzhou. • In current China, IS is main in term of material symbiosis. • How to coordinate IS and low-carbon city is discussed

  18. Color image quality in projection displays: a case study

    Science.gov (United States)

    Strand, Monica; Hardeberg, Jon Y.; Nussbaum, Peter

    2005-01-01

    Recently the use of projection displays has increased dramatically in different applications such as digital cinema, home theatre, and business and educational presentations. Even if the color image quality of these devices has improved significantly over the years, it is still a common situation for users of projection displays that the projected colors differ significantly from the intended ones. This study presented in this paper attempts to analyze the color image quality of a large set of projection display devices, particularly investigating the variations in color reproduction. As a case study, a set of 14 projectors (LCD and DLP technology) at Gjovik University College have been tested under four different conditions: dark and light room, with and without using an ICC-profile. To find out more about the importance of the illumination conditions in a room, and the degree of improvement when using an ICC-profile, the results from the measurements was processed and analyzed. Eye-One Beamer from GretagMacbeth was used to make the profiles. The color image quality was evaluated both visually and by color difference calculations. The results from the analysis indicated large visual and colorimetric differences between the projectors. Our DLP projectors have generally smaller color gamut than LCD projectors. The color gamuts of older projectors are significantly smaller than that of newer ones. The amount of ambient light reaching the screen is of great importance for the visual impression. If too much reflections and other ambient light reaches the screen, the projected image gets pale and has low contrast. When using a profile, the differences in colors between the projectors gets smaller and the colors appears more correct. For one device, the average ΔE*ab color difference when compared to a relative white reference was reduced from 22 to 11, for another from 13 to 6. Blue colors have the largest variations among the projection displays and makes them

  19. The Financing of Media Projects for Development.

    Science.gov (United States)

    Spain, Peter L.

    1978-01-01

    Discusses the financing of Third World media projects that are designed for development, and reports on five main sources of funding--government sources, international agencies, advertising sales, private local support, and self-support. (Author/JEG)

  20. Diagnostic framework and health check tool for engineering and technology projects

    Directory of Open Access Journals (Sweden)

    Simon P Philbin

    2014-10-01

    Full Text Available Purpose: Development of a practitioner oriented diagnostic framework and health check tool to support the robust assessment of engineering and technology projects.Design/methodology/approach: The research is based on a literature review that draws together insights on project assessment and critical success factors to establish an integrated systems view of projects. This is extended to allow a comprehensive diagnostic framework to be developed along with a high-level health check tool that can be readily deployed on projects. The utility of the diagnostic framework and health check tool are explored through three illustrative case studies, with two from Canada and one from the United Kingdom. Findings andOriginality/value: The performance of engineering and technology projects can be viewed through a systems perspective and being a function of six sub-systems that are: process, technology, resources, impact, knowledge and culture. The diagnostic framework that is developed through this research integrates these sub-systems to provide a comprehensive assessment methodology for projects, which is linked to existing best practice for project reviews, performance management and maturity models. The case studies provide managerial insights that are related to the diagnostic framework but crucially also position the approach in the context of industrial applications for construction engineering and technology management.Research limitations/implications: The case study approach includes two case studies from the construction and facilities development sector with the third case study from the research and technology sector. Further work is required to investigate the use of the diagnostic framework and health check tool in other sectors.Practical implications: The health check tool will be of practical benefit to new projects managers that require access to a robust and convenient project review methodology for assessing the status and health of a

  1. Climate change drives wind turbines in China: case study of market based wind power development

    Energy Technology Data Exchange (ETDEWEB)

    Ming Yang [EET Consulting, Glen Waverley, Victoria (Australia)

    2004-07-01

    This paper aims at quantifying the impact of government policy and clean development mechanism (CDM) on wind power development in China. Firstly we review the background of Chinese wind power development and policy, as well as literature of climate change and CDM. We then present methodology, scenarios and data of a case study for the development of a large-scale grid-connected wind farm. We undertake project financial analysis under three scenarios. Our analysis results show that the project FIRR is 8.31% if CDM benefit is not taken into account, 8.72% if CDM benefit is considered with the price of the certified emission reduction (CER) at US dollars 4, and 10.28% if both the CDM benefit and government policy on cutting value added tax (VAT) by 50% are taken into account. This paper concludes that CDM and government preferential policy on value added tax will make wind power development financially viable in China. (author)

  2. Impact of National Fadama Development Project II on Rice farmers ...

    African Journals Online (AJOL)

    ... examined the impact of National Fadama Development Project II on the profitability of rice farmers and assessed the extent to which the various innovations disseminated by the project were adopted by the rice farmer beneficiaries. The project which had all operating expenses cofinanced by the various key stakeholders ...

  3. Analyzing the contributions of a government-commissioned research project : A case study

    NARCIS (Netherlands)

    Hegger, I.; Janssen, S.W.J.; Keijsers, J.F.E.M.; Schuit, A.J.; van Oers, J.A.M.

    2014-01-01

    Background It often remains unclear to investigators how their research contributes to the work of the commissioner. We initiated the ‘Risk Model’ case study to gain insight into how a Dutch National Institute for Public Health and the Environment (RIVM) project and its knowledge products contribute

  4. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  5. Faculty development projects for international health professions educators: Vehicles for institutional change?

    Science.gov (United States)

    Burdick, William P; Friedman, Stacey R; Diserens, Deborah

    2012-01-01

    Projects are an important tool in faculty development, and project emphasis may offer insights into perceived education priorities. Impact of projects has been focused on individuals, not institutions or health. Education innovation projects of Fellows in an international faculty development program were examined to better understand perceived needs in health professions education and institutional impact of projects. Four hundred and thirty-five projects were analyzed to identify focus areas. Fellows were asked to identify changes in their schools and communities resulting from their projects. New education methods and curriculum change were common project focus areas. Regional differences were evident with a higher percentage of education methods projects by Fellows residing in India (52%), compared with South Africa (25%) and Brazil (24%). Fifty-six percent of projects were incorporated into the curriculum and/or incorporated as institutional policy. One-third to two-thirds of respondents noted improved teaching quality, collaboration, education research interest, assessment, student performance, and curriculum alignment with community health needs. National differences in project focus may offer insight into local conditions and needs. High rates of diffusion of projects and impact on faculty, students, and curriculum suggest that faculty development projects may be a strategy for institutional change in resource limited environments.

  6. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  7. Roadmap for biofertilizer development project at Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Khairuddin Abdul Rahim; Ahmad Nazrul Abd Wahid; Phua Choo Kwai Hoe; Pauline Liew Woan Ying; Ahamad Sahali Mardi; Mat Rasol Awang

    2007-01-01

    This paper discusses the roadmap for the Biofertilizer Development Project conducted at the Malaysian Nuclear Agency (Nuclear Malaysia). The project started in 2003 and scheduled to end in 2008. Biofertilizer refers to living microorganisms or materials that contain living microorganisms that contributes to improvement in plant nutrition, soil fertility and crop productivity. The main components of the project are (a) biofertilizer substrate or carrier development, (b) biofertilizer inoculum development based on local indigenous microorganisms (c) biofertilizer product formulation and innovation, and (d) evaluation of efficiency of biofertilizer products on crops under different cropping systems, including under modern agriculture under soilless system. The above components may involve nuclear technology, viz, use of ionising radiation and the use of isotopic tracers. The paper also discusses local and international linkages, including with Forum for Nuclear Cooperation in Asia (FNCA) and the industry, and aspects of commercialisation and technology transfer. (Author)

  8. Development of a website and an information system for an European R&D project : the example of the STRATFEED project

    Directory of Open Access Journals (Sweden)

    Baeten V.

    2003-01-01

    Full Text Available The multidisciplinary nature, the international partnership and the large amount of information to be managed in an European project such as STRATFEED, require the development of an information management system. Within the framework of this project, the development of the Internet-oriented computer system required three facets: the data and information collection, the database building and the development of different applications. A tool for the dissemination of results (STRATFEED website with both a public part and a confidential part, a tool for data management (STRATFEED manager, a tool for data queries (STRATFEED explorer and two tools for decision-making (ARIES Decision Support System –– CD-Rom release and STRATFEED Decision Support System – Internet release were developed. The modular concept, which relates to the different topics of the project, facilitates the updating and development of a system according to research progress and user needs. The concept developed for this project can be used for any other project and can easily be adapted to meet new requirements. The example of the STRATFEED project can be accessed at: http://stratfeed.cra.wallonie.be

  9. Technology choice and CDM projects in China: case study of a small steel company in Shandong Province

    International Nuclear Information System (INIS)

    Kaneko, Shinji; Yonamine, Asaka; Jung, Tae Yong

    2006-01-01

    Corporate motives and strategies of both investing and hosting country affect the outcomes of a clean development mechanism (CDM) project-who introduces what technology to whom-and result in large differences in economic viability and the CO 2 emission reductions. This is particularly true for steel industry in which steel making consists of many detailed and complex processes, a given strategy could produce cumulative effects of the individual technologies used, leading to large energy savings overall. The objective of this study is to demonstrate some analytical methods that can be used to quantitatively evaluate the impacts of technology selection on the profit performance of CDM projects. Specifically, in this study we analyze a CDM project to introduce energy saving technology from Japan to a small steel manufacturer in China's Shandong Province, and conduct a simulation of the quantitative relationships between various technology options and profitability. Based on these results, we examine the environmental and economic significance of technology selection for CDM projects. To take this further, we then reconsider the profitability of a project as typical FDI activity (i.e., without the CDM), and by comparing this outcome with the CDM case, we clarify the significance and potential of the CDM

  10. DEVELOPMENT OF THE STATE SUPPORT FORMS PROJECTS IN INDUSTRIAL BUILDING

    Directory of Open Access Journals (Sweden)

    I. M. Meilanov

    2016-01-01

    Full Text Available Aim. The topicality of the research is stipulated by the objective necessity of the organizational and economic mechanism improvement of the state support projects of the industrial building. The aim of the research is the development of conceptual provisions and methodological foundations of financial projects creating conditions for economic growth of Russia based on the construction and putting into effect industrial objects.Methods. In the course of the research the system, subject-functional and structural approaches were implemented to solve the problems set widening the scope of the complex approach to assessment of the current operating mechanism of the state financial support of the projects and financial volume; to criteria stipulation of the most effective projects contest selection: to the search of the investment resources accumulation instrument into industrial building.Results. It is stipulated that state investment policy in industrial building mechanism oriented to define rational investment volumes and their branch, reproductive, technological and territorial structure; option of the building branch development priority; increase of the investment projects efficiency realization. The dynamics of the state support in the form of subsidies and budget investments into creation of the industrial building objects is analytically summarized. It is determined that the peculiarity of the modern state support projects of industrial building is transition from budget allocations distribution between branches and regions to selective and partial financing of specific investment projects on competitive basis. Some tactics of state and private partnership attracting private capital without losing strategic state control under systems and objects are defined. As an effective form of the industrial building support projects it is proposed to use a concession model form: projecting - building- financing- ownership - exploitation

  11. A Process Towards Societal Value within a Community-Based Regional Development Project

    Directory of Open Access Journals (Sweden)

    Anna Åslund

    2012-12-01

    Full Text Available Processes, activities and tasks of a community-based area development project are described. The main process has been used three times and a model is presented. An earlier developed process map has been verified. The description of the project can help other communities to plan development projects. The illustration can be valuable for entrepreneurs who are planning a societal value initiative and for decision-makers and stakeholders who can contribute to, are concerned with, or may be affected by societal entrepreneurship. Observation, participating studies, dokumentations and an interview with the project leader has been carried out. Data have been analyzed and compared with the previously developed process map to achieve a deeper understanding of the processes within societal entrepreneurship. The purpose was to study and describe the processes of a community-based area development project and to compare it with a previously developed process map and to verify the process map.

  12. Case-control study of risk factors for the development of laminitis in the contralateral limb in Equidae with unilateral lameness

    International Nuclear Information System (INIS)

    Peloso, J.G.; Cohen, N.D.; Walker, M.A.; Watkins, J.P.; Gayle, J.M.; Moyer, W.

    1996-01-01

    To identify risk factors associated with development of laminitis of the supporting limb in Equidae with unilateral laminitis and to determine the radiographic appearance of this type of laminitis. Retrospective analysis of medical records. 20 Equidae with unilateral lameness that developed laminitis of the contralateral limb. Case animals were compared with matched and unmatched populations of control animals that did not develop contralateral limb laminitis. Lateromedial radiographic projections of affected feet were evaluated for evidence of laminitis. Body weight of case animals was not significantly different from that of control animals, but number of days that control animals were lame prior to recovery was significantly less than number of days that case animals were lame prior to the onset of laminitis. Lateromedial radiographic projections of the foot of the support limb were available for 16 of the 20 case animals. For all 16, thickness of the soft tissue dorsal to the distal phalanx was > 29% of the palmar cortical length of the distal phalanx, but only 1 had evidence of rotation of the distal phalanx. The proportion of case animals that were euthanatized was significantly greater than the proportion of control animals that were euthanatized. Duration of lameness, but not body weight, was a risk factor for development of laminitis in the contralateral limb in Equidae with unilateral lameness, and animals that developed this complication were more likely to be euthanatized than were animals that did not

  13. Personalised nutritional powder for elderly developed in OPTIFEL European Project

    Directory of Open Access Journals (Sweden)

    Monica TRIF

    2016-11-01

    Developing innovative food and services tailored to elderly populations is a new challenge for key players involved in food industry and catering. The population targeted by the OPTIFEL project is elderly cooking at home or making use of meal-on-wheels services for whom the project will develop food products adapted to their taste, habits, needs and constraints.

  14. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  15. The Bruce nuclear project

    International Nuclear Information System (INIS)

    Rose, J.B.

    1981-01-01

    This case study assesses the industrial relations impact of the construction of the Bruce Nuclear Power Development. It examines the labour relations system in the Ontario electric power sector and in major building construction. Industrial relations problems and practices at the Bruce project are reviewed. The focus of the study is on the relationship between the project and the rest of the Ontario industrial construction industry

  16. All projects related to | Page 209 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Project. Known for its dense human population, diverse wild animal species, and large population of domestic animals, Sri Lanka derives both risks and benefits from its wildlife. ... The Arab Council for the Social Sciences: Support for Institutional Development, Core Capacities, and an Inaugural Research Program. Project.

  17. All projects related to | Page 321 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Total Funding: CA$ 1,500,000.00. Universities and Councils Network on Innovation for Inclusive Development in Southeast Asia. Project. The recently completed IDRC-supported project, 104904 Science and Technology Innovation for the Base of the Pyramid (Southeast Asia), supported research on pro-poor innovations in ...

  18. All projects related to | Page 25 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Bolivian public justice performance research study. Project. The Bolivian justice system obtains a conviction in less than 0. Topic: Gender ... Making trade work for small producers in Southeast Asia's least developed countries. Project. Low-income economies depend greatly on agriculture, and growth in this sector ...

  19. MARKETING STRATEGIES IN THE DEVELOPMENT AND IMPLEMENTATION OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-05-01

    Full Text Available The article is devoted to marketing in project management, as the scope of activities aimed at improving the quality characteristics of the project for its further effective market promotion in an increasingly competitive environment. Particular attention is paid to marketing strategies during the development and subsequent sale of the project to the investor. The problem of effective combination of marketing strategies and project management process is being solved.

  20. Risk Management for New Product Development Projects in Food Industry

    Directory of Open Access Journals (Sweden)

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  1. Developing High PV Penetration Cases for Frequency Response Study of U.S. Western Interconnection: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Tan, Jin; Zhang, Yingchen; Veda, Santosh; Elgindy, Tarek; Liu, Yilu

    2017-04-11

    Recent large penetrations of solar photovoltaic (PV) generation and the inertial characteristics of inverter-based generation technologies have caught the attention of those in the electric power industry in the United States. This paper presents a systematic approach to developing test cases of high penetrations of PV for the Western Interconnection. First, to examine the accuracy of the base case model, the Western Electricity Coordinating Council (WECC) model is validated by using measurement data from synchronized phasor measurement units. Based on the 2022 Light Spring case, we developed four high PV penetration cases for the WECC system that are of interest to the industry: 5% PV+15 % wind, 25% PV+15% wind, 45% PV+15% wind, 65% PV+15% wind). Additionally, a method to project PV is proposed that is based on collected, realistic PV distribution information, including the current and future PV power plant locations and penetrations in the WECC system. Both the utility-scale PV plant and residential rooftop PV are included in this study.

  2. Case Studies in Application of System Engineering Practices to Capstone Projects

    Science.gov (United States)

    Murphy, Gloria; vanSusante, Paul; Carmen, Christina; Morris, Tommy; Schmidt, Peter; Zalewski, Janusz

    2011-01-01

    The Exploration Systems Mission Directorate (ESMD) of the National Aeronautics and Space Administration (NASA) sponsors a faculty fellowship program that engages researchers with interests aligned with current ESMD development programs. The faculty-members are committed to run a capstone senior design project based- on the materials and experience gained during the fellowship. For the 2010 - 2011 academic year, 5 projects were approved. These projects are in the areas of mechanical and electrical hardware design and optimization, fault prediction and extra planetary civil site preparation. This work summarizes the projects, describes the student teams performing the work, and comments on the integration of Systems Engineering principles into the projects, as well as the affected course curriculums.

  3. Explaining the differential distribution of Clean Development Mechanism projects across host countries

    International Nuclear Information System (INIS)

    Winkelman, Andrew G.; Moore, Michael R.

    2011-01-01

    The Clean Development Mechanism (CDM) of the Kyoto Protocol represents an opportunity to involve all developing countries in the effort to reduce greenhouse gas emissions while also promoting sustainable development. To date, however, the majority of CDM projects have gone to emerging markets such as China, India, Brazil, and Mexico, while very few least developed countries have hosted projects. This paper investigates the differential distribution of CDM activities across countries. We develop a conceptual model for project profitability, which helps to identify potential country-level determinants of CDM activity. These potential determinants are employed as explanatory variables in regression analysis to explain the actual distribution of projects. Human capital and greenhouse gas emission levels influenced which countries have hosted projects and the amount of certified emission reductions (CER) created. Countries that offered growing markets for CDM co-products, such as electricity, were more likely to be CDM hosts, while economies with higher carbon intensity levels had greater CER production. These findings work against the least developed countries and help to explain their lack of CDM activity. - Research Highlights: → Regression models are used to explain the inter-country distribution of CDM projects. → Emissions and human capital are significant for hosting projects and CER creation. → An economy's emissions intensity is significant in determining CERs created. → Capacity building and electricity sector growth are significant in hosting projects. → The experience level for host countries in the CDM is significant for CER creation.

  4. Actors’ Competencies or Methods? A Case Study of Successful Information Systems Development

    DEFF Research Database (Denmark)

    Omland, Hans Olav; Nielsen, Peter Axel

    2009-01-01

    and methods are exercised. Emphasising the intertwining of competencies and methods, we discuss the character of the intertwining process, how different actors relate to different methods, and how methods may be part of the problem rather than part of the solution to challenges in information systems...... between actors’ competencies and their deployment of methods, arguing that this relationship is described over-simplistically and needs a better explanation. Through a case study of a successful information systems development project we identify some central situations where a variety of competencies...... development. The paper suggests elements for a new model for explaining actors’ competencies and their use of methods....

  5. The International intraval project. Phase 1 test cases

    International Nuclear Information System (INIS)

    1992-01-01

    This report contains a description of the test cases adopted in Phase 1 of the international cooperation project INTRAVAL. Seventeen test cases based on bench-scale experiments in laboratory, field tests and natural analogue studies, have been included in the study. The test cases are described in terms of experimental design and types of available data. In addition, some quantitative examples of available data are given as well as references to more extensive documentation of the experiments on which the test cases are based. Fithteen test cases examples are given: 1 Mass transfer through clay by diffusion and advection. 2 Uranium migration in crystalline bore cores, small scale pressure infiltration experiments. 3 Radionuclide migration in single natural fractures in granite. 4 Tracer tests in a deep basalt flow top. 5 Flow and tracer experiment in crystalline rock based on the Stripa 3-D experiment. 6 Tracer experiment in a fracture zone at the Finnsjon research area. 7 Synthetic data base, based on single fracture migration experiments in Grimsel rock laboratory. 8 Natural analogue studies at Pocos de Caldas, Minais Gerais, Brazil. Redox-front and radionuclide movement in an open pit uranium mine. 9 Natural analogue studies at the Koongarra site in the Alligator Rivers area of the Northern Territory, Australia. 10 Large block migration experiments in a block of crystalline rock. 11 Unsaturated flow and transport experiments performed at Las Cruces, New Mexico. 12 Flow and transport experiment in unsaturated fractured rock performed at the Apache Leap Tuff site, Arizona. 13 Experiments in partially saturated tuffaceous rocks performed in the G-tunnel underground facility at the Nevada Test site, USA. 14 Experimental study of brine transport in porous media. 15 Groundwater flow in the vicinity of the Gorleben Salt Dome, Federal Republic of Germany

  6. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  7. What Happens When the Musicians Leave? Case Study of a Jessie’s Fund Project to Develop Teachers’ Skills and Confidence

    Directory of Open Access Journals (Sweden)

    Tom Northey

    2013-07-01

    Full Text Available This article describes a project delivered by Jessie’s Fund, a UK charity which supports children through music therapy and creative music work. The project took place between January and July 2012 and involved staff and pupils from a special school in the north of England. The article describes briefly how music is delivered in special schools across the UK and explains some of the challenges Jessie’s Fund has faced in having a lasting impact on how schools cover the music curriculum for children with complex needs. In 2012 Jessie’s Fund partnered with a special school in the north of England to design a new approach which focused intensively on the development needs of staff. Jessie’s Fund musicians visited pairs of staff over a period of six months to build their skills and confidence in leading music sessions with their pupils. The project was considerably more effective than some previous ‘musician-led’ activities and had a significant, whole-school impact. This article describes the work that took place, the responses from the staff involved and how Jessie’s Fund intends to use this learning for future projects.

  8. CDM. Information and guidebook - Developed for the UNEP project 'CD4CDM'[Clean development nedianism

    Energy Technology Data Exchange (ETDEWEB)

    Lee, M.K. (ed.)

    2003-12-01

    Since the Clean Development Mechanism (CDM) was defined at Conference of the Parties 3 in Kyoto 1997, it took the international community another 4 years to reach the Marrakesh Accords in which the modalities and procedures to implement the CDM was elaborated. Even if more detailed rules, procedures and modalities have to be further developed a general framework to implement the CDM and other Kyoto mechanisms are now in place. This guidebook is produced to support the UNEP project 'Capacity Development for the Clean Development Mechanism'. Focus is on the CDM project cycle, the Project Design Document (PDD), and related issues such as sustainable development goals, financing and market intelligence. The appendices present frequently asked questions and answers, a short overview of existing guidelines and a possible future list of eligible CDM projects categories. (BA)

  9. Generalising via the Case Studies and Adapting the Oil and Gas Industry's Project Execution Concepts to the Construction Industry

    OpenAIRE

    Mejlænder-Larsen, Øystein

    2015-01-01

    The aim of this paper is to explore whether it is possible to generalise findings on project execution in the oil and gas industryrelated to the use of project execution models and a 3D design environment, based on case study research. Besides, sufficientsimilarities between the two industries were assessed and the applicability of the findings from the cases in the oil and gasindustry was assessed. The selected cases (the ongoing ...

  10. FUNMIG Integrated Project results and conclusions from a safety case perspective

    International Nuclear Information System (INIS)

    Schwyn, B.; Wersin, P.; Rüedi, J.; Schneider, J.; Altmann, S.; Missana, T.; Noseck, U.

    2012-01-01

    scales and by developing improved modelling approaches. The disposal concept in salt host rocks differs from those in other host rock types in that the host rock is, at least in part, regarded as near-field from which under normal scenarios no release of radionuclides is possible. Corresponding investigations in FUNMIG concerned therefore not salt host rocks but an example of an overburden under the premise of radionuclide escape from the salt barrier. Selected highlights with regard to FUNMIG’s achievements include: For argillaceous host rocks, the systematic effort of investigating and comparing diffusion and sorption processes at different scales in different clay rocks using a variety of methods has substantially increased the knowledge basis for future safety cases. For crystalline host rocks, valuable data on the generation, transport and filtration of clay colloids from the near-field and their impact on RN transport under realistic conditions have been obtained. The results from studies on organic colloids and on biofilms, including their interaction with radionuclides, have been shown to be of interest for future safety cases of salt-host rocks. Among the main research issues from a PA perspective that need to be addressed in the future, the following are noted: (i) the question of irreversibility of RN sorption to colloids in fractures of crystalline rocks, (ii) a comprehensive model for cation and anion diffusion in clays for different scales and (iii) the applicability of mechanistic retardation models for strongly sorbing radionuclides in intact clay and crystalline host rocks. An important lesson learnt from the interaction between research and PA is that it would be desirable to apply a similar evaluation procedure for proposed research tasks before the start of the research work. In this regard, the procedures developed within FUNMIG are a useful tool for planning future Integrated Projects.

  11. Key Findings from the U.S.-India Partnership for Climate Resilience Workshop on Development and Application of Downscaling Climate Projections

    Science.gov (United States)

    Kunkel, K.; Dissen, J.; Easterling, D. R.; Kulkarni, A.; Akhtar, F. H.; Hayhoe, K.; Stoner, A. M. K.; Swaminathan, R.; Thrasher, B. L.

    2017-12-01

    s part of the Department of State U.S.-India Partnership for Climate Resilience (PCR), scientists from NOAA NCEI, CICS-NC, Texas Tech University (TTU), Stanford University (SU), and the Indian Institute of Tropical Meteorology (IITM) held a workshop at IITM in Pune, India during 7-9 March 2017 on the development, techniques and applications of downscaled climate projections. Workshop participants from TTU, SU, and IITM presented state-of-the-art climate downscaling techniques using the ARRM method, NASA NEX climate products, CORDEX-South Asia and analysis tools for resilience planning and sustainable development. PCR collaborators in attendance included Indian practitioners, researchers and other NGO including the WRI Partnership for Resilience and Preparedness (PREP), The Energy and Resources Institute (TERI), and NIH. The scientific techniques were provided to workshop participants in a software package written in R by TTU scientists and several sessions were devoted to hands-on experience with the software package. The workshop further examined case studies on the use of downscaled climate data for decision making in a range of sectors, including human health, agriculture, and water resources management as well as to inform the development of the India State Action Plans. This talk will discuss key outcomes including information needs for downscaling climate projections, importance of QA/QC of the data, key findings from select case studies, and the importance of collaborations and partnerships to apply downscaling projections to help inform the development of the India State Action Plans.

  12. Regional hydrogen roadmap. Project development framework for the Sahara Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Benhamou, Khalid [Sahara Wind Inc., Rabat (Morocco); Arbaoui, Abdelaziz [Ecole National Superieure des Arts et Metiers ENSAM Meknes (Morocco); Loudiyi, Khalid [Al Akhawayn Univ. (Morocco); Ould Mustapha, Sidi Mohamed [Nouakchott Univ. (Mauritania). Faculte des Sciences et Techniques

    2010-07-01

    The trade winds that blow along the Atlantic coast from Morocco to Senegal represent one of the the largest and most productive wind potentials available on earth. Because of the erratic nature of winds however, wind electricity cannot be integrated locally on any significant scale, unless mechanisms are developed for storing these intermittent renewable energies. Developing distributed wind energy solutions feeding into smaller electricity markets are essential for solving energy access issues and enabling the development of a local, viable renewable energy industry. These may be critical to address the region's economic challenges currently under pressure from Sub-Saharan migrant populations. Windelectrolysis for the production of hydrogen can be used in grid stabilization, as power storage, fuel or chemical feedstock in specific industries. The objective of the NATO SfP 'Sahara Trade Winds to Hydrogen' project is to support the region's universities through an applied research framework in partnership with industries where electrolysis applications are relevant. By powering two university campuses in Morocco and Mauritania with small grid connected wind turbines and 30 kW electrolyzers generating hydrogen for power back-up as part of ''green campus concepts'' we demonstrated that wind-electrolysis for the production of hydrogen could absorb larger quantities of cheap generated wind electricity in order to maximize renewable energy uptakes within the regions weaker grid infrastructures. Creating synergies with local industries to tap into a widely available renewable energy source opens new possibilities for end users such as utilities or mining industries when processing raw minerals, whose exports generates key incomes in regions most exposed to desertification and climate change issue. Initiated by Sahara Wind Inc. a company from the private sector, along with the Al Akhawayn University, the Ecole Nationale Superieure

  13. Development and Marketing of Project Finance & Project Monitoring as New Services – The Case of SGS Zurich

    OpenAIRE

    Tizro, Behrouz

    2010-01-01

    The need to be present and invest in foreign markets beyond companies` own geographical borders necessitates strict supervision. This is not easy and of course not inexpensive for investing bodies to firstly decide reasonably on investments which would be feasible and assume financial undertakings and secondly have regular presence in their investment project and their location. Furthermore they may not have the necessary resources or required expertises within their own organizations to assi...

  14. Oxide fuel fabrication technology development of the FaCT project (1). Overall review of fuel technology development of the FaCT project

    International Nuclear Information System (INIS)

    Abe, Tomoyuki; Namekawa, Takashi; Tanaka, Kenya

    2011-01-01

    The FaCT project is in progress in Japan for the commercialization of fast reactor cycle system. The development goal of the fuel in the FaCT project is a low-decontaminated TRU homo-recycling in a closed cycle and extension in average discharge burn-up to 150 GWd/t. Research and development on innovative technologies concerning the short process, remote maintenance and cooling system of automatic fuel production equipments, long life cladding material and control of oxygen potential have been conducted in phase I of the FaCT project. As the result of various test including 600 g batch MOX tests, it is concluded that the short process is available to fuel pellet fabrication of the FaCT project. Although cold mock-up tests on test model of some typical process equipments suggest possibilities of remote maintenance of automatic fuel fabrication equipment, it is concluded that it still needs further efforts to judge the operability of the completely remote fabrication for low-decontaminated TRU fuel. A cold mock-up test on fuel pin assembling equipment show that influence of decay heat of MA can be managed by cooling system. Irradiation tests in BOR-60 indicate that 9Cr-ODS possess the satisfactory in-reactor performance as the long life cladding material if homogeneity of alloy element is adequately controlled. Modification of cladding tube fabrication process to ensure homogeneity and further development of measures to control oxygen potential inside the fuel pin are necessary to reach the burn-up target of the FaCT project. (author)

  15. PROJECT MANAGEMENT OFFICE – LINK BETWEEN ORGANIZATIONAL STRATEGIC AND OPERATIONAL: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Mario Manzini Cianfanelli

    2014-12-01

    Full Text Available The objective of this work is to demonstrate the organizational integration achieved through the implementation of a project management office (PMO, created to combat the loss of water distribution in one of the business units of Basic Sanitation Company of the State of São Paulo – Sabesp. The methodology used to achieve this goal was the study of a single case in which the information was obtained through documentary research and semi-structured interviews. The results showed how this integration was achieved with the adoption of a standard methodology in project management, control based on information technology and the spread of the organization's strategy in the sectors below. This work concluded that with this implantation of the project management office it was possible to improve the planning and the control of the activities of the projects through a pattern methodology in managing projects that gave possibilities to create a new culture focusing in solving problems.

  16. Existing Whole-House Solutions Case Study: Greenbelt Homes, Inc. Pilot Retrofit Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-06-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc., (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects that include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy-savings benefits of improvements. Phase 1—baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2—installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season; Phase 3—energy simulations supporting recommendations for HVAC and water heating upgrades.

  17. Development of an identification system for potential ICES projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-11-01

    An earlier study by Real Estate Research Corporation (RERC) provides an overview of methods for developing marketing strategies for ICES. One aim of that document was to establish an information system for identifying areas, subareas, sites, or projects with substantial growth or development activity as potential candidates for the application of ICES. This report summarizes RERC's effort to implement and test such an information system. The specific objectives of this report are: (1) identify and collect basic information on 150 large-scale construction projects; (2) identify areas of the country, i.e., states and SMSAs that evidence general growth characteristics that would support ICES applications; (3) identify regions, states, and SMSAs that display higher-than-average energy costs; and (4) identify regions, states, and SMSAs that have experienced significant activity in identified land-use sectors and subsectors. Recent development activities in the commercial, industrial, residential, institutional, and transportation sectors are detailed. Mixed-use projects are included within the commercial sector. An annotated bibliography is included. (MCW)

  18. Development of Entrepreneurship Competences from Project Based Learning Approaches

    Directory of Open Access Journals (Sweden)

    Lidia SÁNCHEZ GONZÁLEZ

    2017-02-01

    Full Text Available A key issue for any educational institution is to train individuals in such a way that they participate efficiently in their context. The current context where learning is carried out is digital era. With this landscape, and taking into account the current socioeconomic situation, it is necessary to increase students’ employability. This requires that what is taught in educational institutions fits with companies’ requirements. In this sense one of most common companies’ requirement is that students have knowledge about how to develop a project from scratch. In order to address this issue, the present paper poses the application of a project based learning methodology. This methodology is applied in an experiment that comprises two academic years. During each year, the students should develop complete projects working as teams and obtain final products. In this way, it was possible to develop competences that can be interesting for companies and also to increment students’ motivation.

  19. Developing Communities of Practice around e-Learning and Project Management

    Science.gov (United States)

    Laxton, Ruth; Applebee, Andrelyn Cheryl

    2010-01-01

    In 2007-8 the Australian Catholic University (ACU National), undertook a project to develop new resources to provide training and support in eLearning for staff and students. The project was undertaken by a multidisciplinary team drawn from all six campuses and was led by an externally contracted Project Manager/eLearning specialist. This…

  20. Quality Management in Project Management Consulting. A Case Study in an International Consulting Company

    Directory of Open Access Journals (Sweden)

    Eduard-Gabriel Ceptureanu

    2017-02-01

    Full Text Available The present paper addresses quality management from the specific perspective of project management consulting service providers, in the framework of large infrastructure projects. Because of their supposed superiority in knowledge and experience, project management consultants have an ultimate responsibility for the proper implementing of the project. Therefore, quality management in consulting organizations should focus on critical success factors. As there is no consensus yet regarding the most important aspects of the consulting activity on which depend the achievement of the project aims, there is scope for further investigating this subject. Here, the case of a project management consulting organization involved in large infrastructure projects in Romania, Bulgaria, Moldova, Ukraine and Serbia is analyzed. Data collected through a questionnaire-based survey among international consultants and support personnel suggest that factors related to leadership style and communication skills are more closely tied to the success of the project than more technical aspects. The results constitute an empirical evidence of main success factors for specialized consulting services in project management and can be useful in improving business and project performance and achieving business excellence.

  1. Public involvement in multi-objective water level regulation development projects-evaluating the applicability of public involvement methods

    International Nuclear Information System (INIS)

    Vaentaenen, Ari; Marttunen, Mika

    2005-01-01

    Public involvement is a process that involves the public in the decision making of an organization, for example a municipality or a corporation. It has developed into a widely accepted and recommended policy in environment altering projects. The EU Water Framework Directive (WFD) took force in 2000 and stresses the importance of public involvement in composing river basin management plans. Therefore, the need to develop public involvement methods for different situations and circumstances is evident. This paper describes how various public involvement methods have been applied in a development project involving the most heavily regulated lake in Finland. The objective of the project was to assess the positive and negative impacts of regulation and to find possibilities for alleviating the adverse impacts on recreational use and the aquatic ecosystem. An exceptional effort was made towards public involvement, which was closely connected to planning and decision making. The applied methods were (1) steering group work, (2) survey, (3) dialogue, (4) theme interviews, (5) public meeting and (6) workshops. The information gathered using these methods was utilized in different stages of the project, e.g., in identifying the regulation impacts, comparing alternatives and compiling the recommendations for regulation development. After describing our case and the results from the applied public involvement methods, we will discuss our experiences and the feedback from the public. We will also critically evaluate our own success in coping with public involvement challenges. In addition to that, we present general recommendations for dealing with these problematic issues based on our experiences, which provide new insights for applying various public involvement methods in multi-objective decision making projects

  2. A Project Management Approach to M&A Deals and their Post-Integration Projects : A Case Study

    OpenAIRE

    Habibbeigi, Pooria

    2010-01-01

    Mergers and acquisitions (M&A) projects have long been considered as a strategy for organizational growth and gain of market share. Top management teams of companies take M&As into consideration since it is faster and less costly compare to internal growth and development programs. M&A project has variety of benefits such as growth in market share, increase in shareholder wealth, access to new markets, technological advantages and so on and so forth. Another benefit of such projec...

  3. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  4. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  5. All projects related to | Page 131 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Any -, Development, Economics, Environment, Evaluation, Food and Agriculture, Gender ... This project seeks to provide capacity-building support to develop and ... Topic: Climate change, ENVIRONMENTAL MANAGEMENT, POLICY MAKING, ... Inclusive Development and Chinese Foreign Direct Investment in the Greater ...

  6. The Disk Mass project; science case for a new PMAS IFU module

    NARCIS (Netherlands)

    Verheijen, M. A. W.; Bershady, M. A.; Andersen, D. R.; Swaters, R. A.; Westfall, K.; Kelz, A.; Roth, M. M.

    2004-01-01

    We present our Disk Mass project as the main science case for building a new fiber IFU-module for the PMAS spectrograph, currently mounted at the Cassegrain focus of the 3.5m telescope on Calar Alto. Compared to traditional long-slit observations, the large light collecting power of 2-dimensional

  7. The Use of Volunteers in Local Study Library Projects: A Case Study of the Walter Gardiner Photography Project

    Directory of Open Access Journals (Sweden)

    Beth Hewitt

    2012-03-01

    Full Text Available Objectives – Interviews with library staff and volunteers were conducted to evaluate the use of volunteers in UK public libraries via a case study of the Walter Gardiner Photographic Project, a digitisation project based in Worthing Library, to inform future guidelines on volunteer usage and to make recommendations to existing practice.Methods – Fourteen semi-structured interviews were carried out to explore the perceptions and experiences of both staff and volunteers of the project. All interviews were fully transcribed and then coded to identify emergent themes.Results – Key positives for volunteers were professional training, good time management and organization by staff, the friendliness and approachability of staff, and the informal nature of the volunteering. Enjoyment of the work and forming close relationships with others were key motivating factors. For staff, the completion of work which would have otherwise been impossible was the most positive outcome. Problem areas identified by volunteers were lack of contact time with project staff and feeling isolated from other library staff. For project staff, a lack of professionalism on behalf of some volunteers was the primary negative. Key issues to emerge were the need to strike a balance between formal and informal management, the need for good integration between the volunteers and host organization, and the importance of acknowledging the nature of the voluntary commitment.Conclusions – The project proved overall to be a successful example of using volunteers in public library projects with good examples of volunteer recruitment, training, and management being demonstrated. Areas of conflict that did arise stemmed from differing expectations of levels of service between staff and volunteers. Clarification on these expectations through a written volunteer agreement is advocated for further projects.

  8. Time for Decarbonization of Conservation and Development Projects? The Political Ecology of Carbon Projects

    Directory of Open Access Journals (Sweden)

    Pierre L. Ibisch

    2015-01-01

    Full Text Available The globe's first carbon projects were designed and implemented approximately 20 years ago following scientific insights that emissions of greenhouse gases needed to be mitigated. Visible in some of these early projects were the important aspects of social governance and local benefit sharing. The projects promised to be a panacea to environmental, social and economic problems in remote rural areas of developing countries. However, it took another decade before a wave of hundreds of carbon projects were launched. Many of the projects were offered under the mechanism of REDD+ (Reducing Emissions from Deforestation and forest Degradation, plus the role of conservation, sustainable forest management and carbon enhancement, as well as under a variety of voluntary schemes and national programs, public-private partnerships, and forestry-based investment initiatives. As decision-makers prepare the Conference of the Parties of the United Nations Framework Convention on Climatic Change in Paris (COP21, Earthscan has released a book entitled `Carbon conflicts and forest landscapes in Africa', edited by Melissa Leach and Ian Scoones. According to the editors, the focus of the book is on what happens on the ground when carbon forestry projects arrive, what types of projects work, and, equally important, what doesn’t work.

  9. The development of today's mineable oil sands projects, the key factors influencing economics

    International Nuclear Information System (INIS)

    Lynn, J.R.

    1991-01-01

    Many factors influence the perception of economic performance for developing projects. Some of these factors can be controlled by the developer, while some are outside the developer's sphere of influence. Technology selection, management systems, stakeholder involvement, environmental responsiveness and risk management are areas that may be influenced, however interest rates, product prices and currency exchange all have a measurable effect on project economics and are beyond a developer's control. Economic considerations for evaluating mineable oil sand development projects are outlined, focussing on the key factors unique to such developments in general and to the OSLO project in particular. The OSLO project is a proposed $5 billion energy development that entails constructing an open pit oil sands mine and a bitumen extraction facility north of Fort McMurray, Alberta, coupled with a bitumen upgrader in the Redwater area. 7 figs

  10. Kikori River basin project to sustain environment alongside development

    International Nuclear Information System (INIS)

    Price, J.B.; Power, A.P.; Henry, D.

    1994-01-01

    Protecting people and the environment is an essential design and operational criteria for the Kutubu Petroleum Development Project to minimize the physical, social and economic impacts on the local people and their environment in Papua New Guinea. This paper describes how Kutubu was implemented, and how World Wildlife Fund is assisting the neighboring communities to utilize their natural resources for long term benefit. The objectives and first year expectations of a three year integrated conservation and development project are identified, and the progress is summarized

  11. Selection of priority investment projects for the development of the Russian Arctic

    Science.gov (United States)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is

  12. Guidebook on the development of projects for uranium mining and ore processing

    International Nuclear Information System (INIS)

    1991-04-01

    Bringing a uranium operation into production involves a sequence of interrelated steps. These are outlined in the simplified diagram of Fig. 1. The challenge is to determine how the various steps of the development sequence should function and whether the costs are sufficiently low to return a positive benefit to the owner. This Guidebook has been prepared to aid in the planning, development and implementation of feasible uranium projects. It is one in a series of publications by the IAEA. This guidebook is essentially the executive summary of the other publications. It is an overview of the systematic approach to project development. It might be viewed as the ''road map'' of a project. A list of other publications in this series is provided in the Bibliography. Each chapter of the Guidebook addresses a critical aspect of project development. Chapters follow a general sequence, but none should be considered in isolation. Each Chapter presents an overview of the requirements for reaching decisions necessary to advance a project. References are provided to more definitive information and to documents which will be required by technical personnel on a project. Such detailed publications include IAEA books such as ''An Instruction Manual on Methods for Estimation of Uranium Ore Reserves'', and the ''Significance of Mineralogy in the Development of Flow Sheets for Processing Uranium Ores''. This Guidebook does not detail how to do project development but rather what must be done to insure that all critical elements of a project are considered. Refs, figs and tabs

  13. Rock stress measurements. Preparatory stage of the equipment development project

    International Nuclear Information System (INIS)

    Mononen, S.; Hakala, M.; Mikkola, P.

    2002-01-01

    In recent years the rock stress measurement methods used in Finland have been overcoring and hydraulic fracturing. There have been mainly two companies involved in these measurements, namely Suomen Malmi Oy (Smoy) and SwedPower AB. Smoy has done measurements for mines and for rock engineering projects, whereas SwedPower AB has mainly been involved in nuclear waste disposal investigations and conducted hydraulic fracturing measurements in deep boreholes. Smoy together with its partners started in February 2001 a project named JTM, which was a preliminary stage for a future project, which aims to develop a device most suitable for rock stress measurements in Finland. The partners in the project were HUT Rock Engineering, Posiva Oy, Saanio and Riekkola Oy, Gridpoint Finland Oy and Geopros Oy. Tekes, the National Technology Agency, provided almost half of the project funding. In the management group of the project were Pekka Mikkola (chairman) and Tero Laurila from Smoy, Pekka Saerkkae and Sakari Mononen (full-time researcher) from HUT, Aimo Hautojaervi (Posiva Oy), Erik Johansson (Saanio and Riekkola Oy), Matti Hakala (Gridpoint Finland Oy) and Heikki Haemaelaeinen (Geopros Oy). The aim of the JTM-project was to find out the needs for the development of a device most suitable for rock stress measurements in Finnish mines and rock engineering projects. During the project work was done to find out the range of rock stress measurement devices available, to find out the needs for measurements, and to get acquainted to the measurements done in Scandinavia. Also a report of the most suitable methods for Finnish rock conditions was done based on literature and on interviews of rock stress experts. Based on all the information collected during the project a clear picture of the needs for rock stress measurements in Finland could be formed and a preliminary plan of a future project was done. The aim of the suggested project is to build a device based on hydraulic fracturing

  14. Automating the management of software projects in a developing it ...

    African Journals Online (AJOL)

    Software project management is the control of the transformation of users' ... Model from The American Systems Corporation (ASC) was used for risk management. ... Multi-site development approach facilitates large projects by using simple ...

  15. Coordinating Management Activities in Distributed Software Development Projects

    OpenAIRE

    Bendeck, Fawsy; Goldmann, Sigrid; Holz, Harald; Kötting, Boris

    1999-01-01

    Coordinating distributed processes, especially engineering and software design processes, has been a research topic for some time now. Several approaches have been published that aim at coordinating large projects in general, and large software development processes in specific. However, most of these approaches focus on the technical part of the design process and omit management activities like planning and scheduling the project, or monitoring it during execution. In this paper, we focus o...

  16. Organizational and Functional Modeling of Business Processes for Management of the Development Project Efficiency

    OpenAIRE

    Soboleva Elena

    2017-01-01

    The article is devoted to development project management issues in the current economic situation in Russia, to the construction industry, to the problems of development projects implementation in Russia and to the impact of the quality of projects in the construction industry, to assessment of the impact of external project environment on the effectiveness of project activities in crisis, as well as to project management quality. A methodological approach to qualitative management of develop...

  17. Development of a nurse case management service: a proposed business plan for rural hospitals.

    Science.gov (United States)

    Adams, Marsha Howell; Crow, Carolyn S

    2005-01-01

    The nurse case management service (NCMS) for rural hospitals is an entrepreneurial endeavor designed to provide rural patients with quality, cost-effective healthcare. This article describes the development of an NCMS. A detailed marketing and financial plan, a review of industry trends, and the legal structure and risks associated with the development of the venture are presented. The financial plan projects a minimum savings of 223,200 dollars for rural institutions annually. To improve quality and reduce cost for rural hospitals, the authors recommend implementation of an NCMS.

  18. Visualizing Practices in Project-based Design

    DEFF Research Database (Denmark)

    Whyte, Jennifer; Tryggestad, Kjell; Comi, Alice

    2016-01-01

    Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed t...... representations enabled participants in project-based design to develop and share understanding. The complexity of projects and their distributed and mediated nature makes this approach timely and important in addressing new research questions and practical challenges.......Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed...... of situated design. This allows the researcher to be nimble, tracing connections across complex engineering projects; reconstructing practices through their visual representations; and observing their effects. Second, it articulates how, in these empirical cases, interaction with a cascade of visual...

  19. Complex New Product Development projects - How the Project Manager’s Information Sharing With Core Actors Changes Over Time

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde

    2013-01-01

    A heavily burdened project manager must ensure effective information sharing with actors inside and outside the organization because this is a necessary condition for a new product development (NPD) project to achieve its objectives. Knowledge, however, on who actually assists a project manager...... with the information sharing during NPD projects is limited; therefore, this study of longitudinal objective email data (4658 emails) during a NPD project contributes to theory and practice by advancing our understanding of when and how the project manager establishes relationships with different core actors inside...

  20. Purposeful Development: Being Ready When Your Project Moves From ‘Hobby’ to Mission Critical

    Directory of Open Access Journals (Sweden)

    Terry Reese

    2012-02-01

    Full Text Available Throughout the library community examples can be found of development projects evolving into mission critical components within an organization's workflow. How these projects make that move is unique and varied, but little discussion has been had about how these projects impact their developers and the project community. What responsibilities does a developer have to ensure the long-term viability of their project? Does simply freeing the code meet those long-term responsibilities, or is there an implied commitment to provide long-term "care and feeding" to project communities built up over time? Code4Lib represents a group of developers consistently looking to build the next big thing, I'd like to step back and look at some of my own experiences related to the long-term impacts that come with developing successful projects and communities, and try to provide library developers food for thought as they consider their own ongoing responsibilities to their projects and user communities.