WorldWideScience

Sample records for day dam tailrace

  1. Computational Fluid Dynamics Modeling of the John Day Dam Tailrace

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.; Serkowski, John A.

    2010-07-08

    US Army Corps of Engineers - Portland District required that a two-dimensional (2D) depth-averaged and a three-dimensional (3D) free-surface numerical models to be developed and validated for the John Day tailrace. These models were used to assess potential impact of a select group of structural and operational alternatives to tailrace flows aimed at improving fish survival at John Day Dam. The 2D model was used for the initial assessment of the alternatives in conjunction with a reduced-scale physical model of the John Day Project. A finer resolution 3D model was used to more accurately model the details of flow in the stilling basin and near-project tailrace hydraulics. Three-dimensional model results were used as input to the Pacific Northwest National Laboratory particle tracking software, and particle paths and times to pass a downstream cross section were used to assess the relative differences in travel times resulting from project operations and structural scenarios for multiple total river flows. Streamlines and neutrally-buoyant particles were seeded in all turbine and spill bays with flows. For a Total River of 250 kcfs running with the Fish Passage Plan spill pattern and a spillwall, the mean residence times for all particles were little changed; however the tails of the distribution were truncated for both spillway and powerhouse release points, and, for the powerhouse releases, reduced the residence time for 75% of the particles to pass a downstream cross section from 45.5 minutes to 41.3 minutes. For a total river of 125 kcfs configured with the operations from the Fish Passage Plan for the temporary spillway weirs and for a proposed spillwall, the neutrally-buoyant particle tracking data showed that the river with a spillwall in place had the overall mean residence time increase; however, the residence time for 75% of the powerhouse-released particles to pass a downstream cross section was reduced from 102.4 min to 89 minutes.

  2. Acoustic Doppler Current Profiler Measurements in the Tailrace at John Day Dam

    Energy Technology Data Exchange (ETDEWEB)

    Cook, Chris B.; Dibrani, Berhon; Serkowski, John A.; Richmond, Marshall C.; Titzler, P. Scott; Dennis, Gary W.

    2006-01-30

    Acoustic Doppler current profilers (ADCPs) were used to measure water velocities in the tailrace at John Day Dam over a two-week period in February 2005. Data were collected by the Pacific Northwest National Laboratory for the Hydraulic Design Section, Portland District, U.S. Army Corps of Engineers (USACE). The objective of this project was therefore to collect field measurements of water velocities in the near-field draft tube exit zone as well as the far-field tailrace to be used for improving these models. Field data were collected during the project using five separate ADCPs. Mobile ADCP data were collected using two ADCPs mounted on two separate boats. Data were collected by either holding the boat on-station at pre-defined locations for approximately 10 minutes or in moving transect mode when the boat would move over large distances during the data collection. Results from the mobile ADCP survey indicated a complex hydrodynamic flow field in the tailrace downstream of John Day Dam. A large gyre was noted between the skeleton section of the powerhouse and non-spilling portion of the spillway. Downstream of the spillway, the spillway flow is constrained against the navigation lock guide wall, and large velocities were noted in this region. Downstream of the guide wall, velocities decreased as the spillway jet dispersed. Near the tailrace island, the flow split was measured to be approximately equal on Day 2 (25.4 kcfs spillway/123 kcfs total). However, approximately 60% of the flow passed along the south shore of the island on Day 1 (15.0 kcfs spillway/150 kcfs total). At a distance of 9000 ft downstream of the dam, flows had equalized laterally and were generally uniform over the cross section. The collection of water velocities near the draft tube exit of an operating turbine unit is not routine, and equipment capable of measuring 3D water velocities in these zones are at the forefront of hydraulic measurement technology. Although the feasibility of

  3. Survival of Subyearling Fall Chinook Salmon in the Free-flowing Snake River and Lower Snake River Reservoirs in 2003 and from McNary Dam Tailrace to John Day Dam Tailrace in the Columbia River from 1999 to 2002, 1999-2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Muir, William D.; Axel, Gordon A.; Smith, Steven G. (National Marine Fisheries Service, Northwest Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2004-12-01

    Nary Dam, PIT tagged them, and released them to the tailrace as part of an evaluation of transportation from McNary Dam in 2002. Estimated survival in 2002 from the tailrace of McNary Dam to the tailrace of John Day Dam was 0.746 (s.e. 0.036). For migration years 1999-2002, we found that in the reach from McNary to John Day Dam reach, travel time was shorter (migration rate was greater) and survival probabilities were greater when flow volume was greater. Survival was also correlated with water temperature: warmer water was associated with decreased survival, and there was an apparent survival threshold at about 19.3 C (above this temperature survival decreased substantially).

  4. Feasibility of tracking fish with acoustic transmitters in the Ice Harbor Dam tailrace.

    Science.gov (United States)

    Ingraham, John M; Deng, Z Daniel; Martinez, Jayson J; Trumbo, Bradly A; Mueller, Robert P; Weiland, Mark A

    2014-02-13

    The Juvenile Salmon Acoustic Telemetry System (JSATS) has been used at many dams but has never been deployed in the near-dam tailrace environment. The use of JSATS in the tailrace is of interest to fishery managers to evaluate downstream passage behavior of juvenile salmonids and dam approach behavior of upstream migrating adult salmon and lamprey. The acoustic noise level and detection range of JSATS were studied to determine the feasibility of deploying JSATS in the Ice Harbor Dam tailrace. The noise level measured from the powerhouse deck was less than 104 dB re 1 μPa except for the turbine outlet near the spillway, and 350 m downstream of the dam, the noise level was less than 106 dB. The measured noise levels would allow a theoretical detection range of 100 m to 350 m and 85 m to 320 m, respectively. Validation experiments showed that the detection range is 113 to 184 m using hydrophones deployed from the powerhouse deck and 148 m using hydrophones deployed 500 m downstream of the dam.

  5. The Feasibility of Using an Ultrasonic Fish Tracking System in the Tailrace of Lower Granite Dam in 2002

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.; Cash, Kenneth; Zimmerman, Shon A.

    2003-09-10

    This report describes a study conducted by PNNL in Spring 2002 at Lower Granite Dam on the Snake River for the US Army Corps of Engineers Portland District. Our goal was to determine the feasibility of using ultrasonic fish tracking in the untested environment of a hydroelectric dam tailrace. If fish tracking were determined to be feasible, we would track the movement of juvenile hatchery chinook (Oncorhynchus tshawytscha), juvenile hatchery steelhead (O. mykiss), and juvenile wild steelhead (O. mykiss) and relate their movement to dam operations. The majority of fish to be tracked were released as a part of a separate study conducted by the Biological Resources Division of the U.S. Geological Survey (BRD), which was investigating the movement of juvenile salmon in the forebay of Lower Granite Dam in relation to Removable Spillway Weir (RSW) testing. The two studies took place consecutively from April 14 to June 7, 2002.

  6. Factors influencing movement of two migratory fishes within the tailrace of a large neotropical dam and their implications for hydropower impacts

    Science.gov (United States)

    Suzuki, F. M.; Dunham, Jason; Silva, L. G. M.; Alves, C. B. M.; Pompeu, P.S.

    2017-01-01

    Fish attempting to move upstream through hydroelectric dams can be trapped and killed in turbines. Understanding fish movement patterns can provide useful insights for how to manage dam operations to minimize fish kill in turbines. We evaluated the movements of two migratory fish (Curimba-Prochilodus argenteus and Mandi-Pimelodus maculatus) using acoustic telemetry in the tailrace of Três Marias Dam (São Francisco River, Brazil) from 31 October 2011 to 16 February 2012. The majority of tagged fish left the tailrace in less than one week; however, some individuals returned, performing several visits to the tailrace. Mandi remained longer in the tailrace than Curimba. The number of visits was influenced by diel period, turbine and spillway discharge. Although the diel period was the only important contributor to the visits performed by Curimba, the movements of Mandi were significantly influenced by three factors. We found that whereas Curimba was predominantly diurnal, Mandi showed nocturnal habits. Additionally, visits of Mandi were significantly greater during higher turbine and spillway discharge. We discuss the implications of these results for understanding fish movements in the Três Marias Dam tailrace and their potential implications for adapting hydroelectric operations to minimize fish kills.

  7. Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2012-06-04

    This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

  8. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at John Day Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

    2012-11-15

    The purpose of this study was to compare dam passage survival, at two spill treatment levels, of yearling Chinook salmon and steelhead smolts at John Day Dam during spring 2010. The two treatments were 30% and 40% spill out of total project discharge. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated forebay residence time, tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. However, by agreement among the stakeholders, this study was not an official BiOp compliance test because the long-term passage measures at John Day Dam have yet to be finalized and another year of spill-treatment testing was desired.

  9. Compliance Monitoring of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Ploskey, Gene R.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of yearling and subyearling Chinook salmon and steelhead smolts at John Day Dam during the spring and summer outmigrations in 2012. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 for spring migrants and greater than or equal to 0.93 for summer migrants, estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 3 km downstream of the dam, as well as the forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required in the Columbia Basin Fish Accords (Fish Accords). A virtual/paired-release design was used to estimate dam passage survival at John Day Dam. The approach included releases of smolts, tagged with acoustic micro-transmitters, above John Day Dam that contributed to the formation of a virtual release at the face of John Day Dam. A survival estimate from this release was adjusted by a paired release below John Day Dam. A total of 3376 yearling Chinook salmon, 5726 subyearling Chinook salmon, and 3239 steelhead smolts were used in the virtual releases. Sample sizes for the below-dam paired releases (R2 and R3, respectively) were 997 and 995 for yearling Chinook salmon smolts, 986 and 983 for subyearling Chinook salmon smolts, and 1000 and 1000 for steelhead smolts. The Juvenile Salmon Acoustic Telemetry System (JSATS) tags were manufactured by Advanced Telemetry Systems. Model SS300 tags, weighing 0.304 g in air, were surgically implanted in yearling and subyearling Chinook salmon, and Model SS130 tag, weighing 0.438 g in air, were surgically implanted in juvenile steelhead for this investigation. The intent of the spring study was to estimate dam passage survival during both 30% and 40% spill conditions. The two

  10. Abundance and Distribution of Walleye, Northern Squawfish and Smallmouth Bass in John Day Reservoir and Tailrace, 1984 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A.; Faler, Michael P.; Elliott, John C. (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

    1985-06-01

    Walleye, northern squawfish and smallmouth bass abundances were estimated in John Day Reservoir using a modified Schnabel multiple mark and recapture estimator. Sampling was conducted from March 25 to August 31 using gill nets, trap nets, boat electrofishing, angling and an angler survey. A total of 858 walleye, 4552 northern squawfish, and 1599 smallmouth bass were collected. Discrete populations were defined according to observed movements of recaptured and radiotagged fish. Abundance estimates were corrected for angler harvest, size selectivity of gear, tag loss and recruitment due to growth during sampling. In addition, the likelihood of biases resulting from differential mortality of marked fish was examined. Abundances in John Day pool of walleye and northern squawfish with fork lengths greater than 250 mm were estimated at 15,832 and 80,486. Abundances of smallmouth bass with fork lengths greater than 200 mm were estimated to be 2596 in lower John Day pool and 1791 in upper John Day pool. Walleye and northern squawfish moved throughout the pool, whereas movements by smallmouth bass were more localized. Angler harvests of walleye and smallmouth bass in upper John Day pool from April through August were estimated at 309 and 584 fish. Angler harvest of northern squawfish was negligible. Most walleye collected were age 5. The most abundant age groups of northern squawfish and smallmouth bass were 10 and 2. 10 refs., 28 figs., 12 tabs.

  11. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2006 - March 2007. Report C

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2008-01-01

    Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.

  12. Bonneville Project: CFD of the Spillway Tailrace

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

    2012-11-19

    US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

  13. Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Skalski, John R.

    2010-10-01

    The purpose of this compliance study was to estimate dam passage survival of yearling Chinook salmon and steelhead smolts at The Dalles Dam during spring 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay boat-restricted zone (BRZ) to the tailrace BRZ at The Dalles Dam, as well as the forebay residence time, tailrace egress, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A virtual/paired-release design was used to estimate dam passage survival at The Dalles Dam. The approach included releases of acoustic-tagged smolts above John Day Dam that contributed to the formation of a virtual release at the face of The Dalles Dam. A survival estimate from this release was adjusted by a paired release below The Dalles Dam. A total of 4,298 yearling Chinook salmon and 4,309 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation. The dam passage survival results are summarized as follows: Yearling Chinook Salmon 0.9641 (SE = 0.0096) and Steelhead 0.9535 (SE = 0.0097).

  14. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven G.; Muir, William D.; Marsh, Douglas M. (National Marine Fisheries Service, Northwest Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2005-10-01

    wild fish were combined in some of the analyses. Overall, the percentages for combined release groups used in survival analyses were 68% hatchery-reared yearling Chinook salmon and 32% wild. For steelhead, the overall percentages were 73% hatchery-reared and 27% wild. Estimated survival from the tailrace of Lower Granite Dam to the tailrace of Little Goose Dam averaged 0.923 for yearling Chinook salmon and 0.860 for steelhead. Respective average survival estimates for yearling Chinook salmon and steelhead were 0.875 and 0.820 from Little Goose Dam tailrace to Lower Monumental Dam tailrace; 0.818 and 0.519 from Lower Monumental Dam tailrace to McNary Dam tailrace (including passage through Ice Harbor Dam); and 0.809 and 0.465 from McNary Dam tailrace to John Day Dam tailrace. Survival for yearling Chinook salmon from John Day Dam tailrace to Bonneville Dam tailrace (including passage through The Dalles Dam) was 0.735. We were unable to estimate survival through this reach for steelhead during 2004 because too few fish were detected at Bonneville Dam due to operation of the new corner collector at the second powerhouse. Combining average estimates from the Snake River smolt trap to Lower Granite Dam, from Lower Granite Dam to McNary Dam, and from McNary Dam to Bonneville Dam, estimated annual average survival through the entire hydropower system from the head of Lower Granite reservoir to the tailrace of Bonneville Dam (eight projects) was 0.353 (s.e. 0.045) for Snake River yearling Chinook salmon. We could not empirically estimate survival through the entire system for steelhead in 2004 because of low detection rates for this species at Bonneville Dam. For yearling spring Chinook salmon released in the Upper Columbia River, estimated survival from point of release to McNary Dam tailrace was 0.484 (s.e. 0.005) for fish released from Leavenworth Hatchery, 0.748 (s.e. 0.015) for fish released from Entiat Hatchery, 0.738 (s.e. 0.036) for fish released from Winthrop Hatchery

  15. Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at John Day Dam, Summer 2010

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

    2012-11-15

    The purpose of this study was to evaluate dam passage survival of subyearling Chinook salmon (Oncorhynchus tshawytscha; CH0) at John Day Dam (JDA) during summer 2010. This study was conducted by researchers from the Pacific Northwest National Laboratory (PNNL) in collaboration with the Pacific States Marine Fisheries Commission (PSMFC) and the University of Washington (UW). The study was designed to estimate the effects of 30% and 40% spill treatment levels on single release survival rates of CH0 passing through two reaches: (1) the dam, and 40 km of tailwater, (2) the forebay, dam, and 40 km of tailwater. The study also estimated additional passage performance measures which are stipulated in the Columbia Basin Fish Accords.

  16. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  17. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  18. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  19. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Fischer, Eric S.; Skalski, J. R.; Townsend, Richard L.; Duncan, Joanne P.; Hennen, Matthew J.; Wagner, Katie A.; Arntzen, Evan V.; Miller, Benjamin L.; Miracle, Ann L.; Zimmerman, Shon A.; Royer, Ida M.; Khan, Fenton; Cushing, Aaron W.; Etherington, D. J.; Mitchell, T. D.; Elder, T.; Batton, George; Johnson, Gary E.; Carlson, Thomas J.

    2013-05-01

    This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

  20. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Hennen, Matthew J.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Fischer, Eric S.; Duncan, Joanne P.; Batten, G.; Carlson, Thomas J.; Carpenter, Scott M.; Cushing, Aaron W.; Elder, T.; Etherington, D. J.; Johnson, Gary E.; Khan, Fenton; Miracle, Ann L.; Mitchell, T. D.; Prather, K.; Rayamajhi, Bishes; Royer, Ida; Seaburg, Adam; Zimmerman, Shon A.

    2013-06-21

    This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

  1. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

    2012-06-01

    The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  2. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

    2012-02-01

    The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  3. Compliance Monitoring of Subyearling Chinook Salmon Survival and Passage at The Dalles Dam, Summer 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Johnson, Gary E.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at The Dalles Dam during summer 2012. Under the 2008 Federal Columbia River Power System Biological Opinion, dam passage survival is required to be greater than or equal to 0.93 and estimated with a standard error (SE) less than or equal to 0.015. The study also estimated survival from the forebay 2 km upstream of the dam and through the tailrace to 2 km downstream of the dam, forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required by the 2008 Columbia Basin Fish Accords.

  4. Simulation analysis of within-day flow fluctuation effects on trout below flaming Gorge Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Railsback, S. F.; Hayse, J. W.; LaGory, K. E.; Environmental Science Division; EPRI

    2006-01-01

    In addition to being renewable, hydropower has the advantage of allowing rapid load-following, in that the generation rate can easily be varied within a day to match the demand for power. However, the flow fluctuations that result from load-following can be controversial, in part because they may affect downstream fish populations. At Flaming Gorge Dam, located on the Green River in northeastern Utah, concern has been raised about whether flow fluctuations caused by the dam disrupt feeding at a tailwater trout fishery, as fish move in response to flow changes and as the flow changes alter the amount or timing of the invertebrate drift that trout feed on. Western Area Power Administration (Western), which controls power production on submonthly time scales, has made several operational changes to address concerns about flow fluctuation effects on fisheries. These changes include reducing the number of daily flow peaks from two to one and operating within a restricted range of flows. These changes significantly reduce the value of the power produced at Flaming Gorge Dam and put higher load-following pressure on other power plants. Consequently, Western has great interest in understanding what benefits these restrictions provide to the fishery and whether adjusting the restrictions could provide a better tradeoff between power and non-power concerns. Directly evaluating the effects of flow fluctuations on fish populations is unfortunately difficult. Effects are expected to be relatively small, so tightly controlled experiments with large sample sizes and long study durations would be needed to evaluate them. Such experiments would be extremely expensive and would be subject to the confounding effects of uncontrollable variations in factors such as runoff and weather. Computer simulation using individual-based models (IBMs) is an alternative study approach for ecological problems that are not amenable to analysis using field studies alone. An IBM simulates how a

  5. Compliance Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at The Dalles Dam, Summer 2010

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Carlson, Thomas J.; Skalski, John R.

    2010-12-21

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon smolts at The Dalles Dam during summer 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.93 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 2 km below the dam The forebay-to-tailrace survival estimate satisfies the “BRZ-to-BRZ” survival estimate called for in the Fish Accords. , as well as the forebay residence time, tailrace egress time, and spill passage efficiency, as required in the Columbia Basin Fish Accords. The estimate of dam survival for subyearling Chinook salmon at The Dalles in 2010 was 0.9404 with an associated standard error of 0.0091.

  6. Maternal and foetal cytokine production in dams naturally and experimentally infected with Neospora caninum on gestation day 110.

    Science.gov (United States)

    Darwich, L; Li, Y; Serrano-Pérez, B; Mur-Novales, R; Garcia-Ispierto, I; Cabezón, O; López-Gatius, F; Almería, S

    2016-08-01

    In the present study, IFN-γ (Th1), IL-17A (Th17) and IL-4 (Th2) concentrations in response to concanavalin (ConA) and Neospora caninum antigen (Nc-1) stimulation were determined in cultures of cells from control uninfected (n=4), naturally N. caninum-infected (n=3) and experimentally N. caninum-infected (n=6) pregnant dams and their foetuses. Experimental animals were infected at 110days of gestation and euthanized 6weeks post-infection. In culture supernatants from the dams, significantly higher IFN-γ and IL-4 levels were found in the experimentally-infected animals compared to the control or naturally-infected dams. However, among the experimentally-infected dams no significant differences in IFN-γ production were observed regardless of the incidence of live or aborted/dead foetuses, though spleen cultures of dams carrying live foetuses showed the highest levels of IFN-γ. IL-17A production was very low and occasional in the dams infected with N. caninum and did not seem to be a major regulator of IFN-γ production in this model. Experimentally infected dams with live foetuses showed higher IL-4 levels and accordingly IFN-γ/IL-4 ratios were significantly lower than ratios recorded for cows with aborted/dead foetuses. In the infected foetuses of these dams, only spleen cultures showed high levels of IFN-γ and IL-4 after Nc-1 antigen and ConA stimulation, respectively. No IL-17A was detected in the foetuses. As conclusion, although we could not clearly relate a protective immune response against N. caninum abortion only to IFN-γ levels in cell cultures, our results highlight the important role of an inverse IFN-γ/IL-4 balance in conferring protection against abortion induced by this parasite.

  7. HYDRAULIC DEVICES FOR HYDROSYSTEM TAILRACE PROTECTION

    Directory of Open Access Journals (Sweden)

    Kuznetsova Y. A.

    2015-11-01

    Full Text Available Based on the Karman vortex theory, the calculated dependences for velocity induced by profile action in the flow, lifting force and drag force, acting on the profile, are determined. Calculations, performed in MathCAD, allowed, for the given up-stream velocity, to calculate height of mid-section of the bed-formation profile, width of the profile along the chord, span of the profile, angle of attack, velocity of the induced flow. For the calculated profile parameters, the velocity circulation value, drag force and lifting force are determined. As the bed-formation profiles, it is recommended to use flat plates, frame constructions with transverse ribs in the form of arch, fish-like symmetric or slightly curved profiles. Ways of the profile installation in the flow, depending on the angle of attack, are evaluated: three versions - for symmetric profiles, and six versions - for asymmetric profiles. Diagram of the device for the hydrosystem tailrace protection against erosion is developed on the basis of submerged NACA 0302 profile or profile of Zhukovsky, made of flexible materials, including profiles, system of supporting and regulating ropes, and shore or bottom supports. This design is mobile, intended for the periodic regulation of sediment yield

  8. Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study

    Energy Technology Data Exchange (ETDEWEB)

    Cook, Chris B; Richmond, Marshall C; Guensch, Greg

    2001-03-20

    The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating.

  9. SMALL-SCALE MODELING OF DYNAMIC FACILITIES FOR PROTECTION OF HYDROSYSTEM TAILRACES

    Directory of Open Access Journals (Sweden)

    Kuznetsova Y. A.

    2015-11-01

    Full Text Available To study the formation of plunge basin in the Cheboksary hydroplant, we used a scale model of the spillway dam and all structures in the tailrace, installed in the slot flume. When we passed the flow corresponding to the diversion flow of the hydroplant with a glance to the modeling scale, it was found that the plunge basin was formed behind the end fixing of the spillway apron. To research the dynamic facilities of hydrosystem tailrace protection against erosion, we used a small glass flume with a model of the roundcrested weir. For the experiment, the water-surface elevations were built in the flume without the weir, and the uniform motion area was established. In MathCAD software environment, the curve of the flow of measuring rectangular weir of the flume was created. Because of measurements, the curve of water surface by the flow motion through the round-crested weir was made. As the main criterion for modeling, the criterion of Froude was selected. Scale of modeling of flow parameters was determined. For testing, models of hydrodynamic profile and sail structure with streamforming sluice valves were built. The process of sand washout from the flume bottom and formation of the bottom ridges when installing the profile was photographed. Impact of the profile on the flow and its relation with the formation of the bottom topography were studied. Full-scale values of geometric parameters of the bottom ridges and their movement velocity were established as well

  10. Effects of Flow on the Migratory Behavior and Survival of Juvenile Fall and Summer Chinook Salmon in John Day Reservior, 1982 Annual Report of Research.

    Energy Technology Data Exchange (ETDEWEB)

    Miller, David R.; Sims, Carl W.

    1983-11-01

    The National Marine Fisheries Service in cooperation with the Bonneville Power Administration is conducting a 6-year study of the effects of instream flows on the passage time, survival, and migrational behavior of juvenile fall and summer (O-age) chinook salmon in John Day Reservoir. In 1982, the second year of the study, research activities concentrated on refining distribution and behavior data in John Day Reservoir and on releasing and recapturing marked fish needed to define flow/travel time relationships. Twenty-two groups (61,887 fish) of marked O-age chinook salmon were wire-tagged, branded, and released into the tailrace at McNary Dam, and forty-four groups (13,128 fish) were branded and released into the reservoir at various other sites. Sampling at the John Day Dam airlift facility captured 54,647 subyearling chinook salmon including 482 marked recoveries. Additional marks (279) were recovered from purse seine samples taken at various sites throughout the reservoir. The average passage time to John Day Dam for marked O-age chinook salmon released in the McNary tailrace was 23 days. Weekend flow reductions at McNary Dam did not affect passage time of subyearling chinook salmon in John Day Reservoir. There was no statistical evidence to indicate that instream flows affected either the rate of movement or residence time of O-age chinook salmon in John Day Reservoir.

  11. RESEARCH ON THE CONDITION TO SET A TAILRACE SURGE TANK

    Institute of Scientific and Technical Information of China (English)

    ZHAO Gui-lian; YANG jian-dong; XU Yuan-jie; LI Jin-ping

    2004-01-01

    When using the draft-tube vacuum to be less than 8.0m as the rule to set a tailrace surge tank, a mixing function that describes the process of water-hammer vacuum and velocity-head vacuum varied with time is proposed, on the assumption that the guide vane of the hydraulic turbine and the turbine discharge were all changed linearly. An exact maximum of the draft-tube vacuum for the first-phase water-hammer and the last-phase water-hammer is obtained. Finally a much more reasonable formula of critical tailrace length is derived. The results of two cases show that the formula proposed can determine correctly and reasonably whether a tailrace surge tank is needed or not, and are more suitable for project design than the formula suggested by the specification.

  12. A note on acoustic analysis of dairy calves’ vocalizations at 1 day after separation from dam

    Directory of Open Access Journals (Sweden)

    Doo Hwan Kim

    2010-01-01

    Full Text Available The vocalizations of animals are very useful in assessing an emotional state and welfare because they involve information about various emotions. Hence, the findings of the acoustic features of vocalization can be used to improve the productivity and welfare of animals. This study was conducted to analyse the vocalizations of dairy calves separated from the dam. At 6 days after birth, 12 dairy calves were moved into an individual calf pen (3.0m×2.0m bedded with sawdust and straw. One and a half litres of whole milk were fed twice daily and free access to water was allowed. The calves’ vocalizations were divided into humming vocalizations (HVs: low continuous calls without tone changed, semi-humming vocalizations (SHVs: low continuous calls with tone changed, and general vocalizations (GVs. These vocalizations were classified, based on the shapes of waveforms and spectrograms. Differences in the duration, fundamental frequency, intensity, and formants among the classified vocalizations were found (P<0.0001. Acoustic parameters except intensity and 3rd formant were not different between HVs and SHVs. These results suggest that vocalization analysis could be a useful tool in assessing the emotions of calves. Acoustic parameters are also useful in classifying vocalizations. Also, intensity and 3rd formant are advantageous in distinguishing HVs and SHVs.

  13. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  14. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam with Emphasis on the Prototype Surface Flow Outlet, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Deng, Zhiqun; Fu, Tao; Monter, Tyrell J.; Johnson, Gary E.; Khan, Fenton; Wilberding, Matthew C.; Cushing, Aaron W.; Zimmerman, Shon A.; Faber, Derrek M.; Durham, Robin E.; Townsend, Richard L.; Skalski, John R.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.

    2009-12-01

    The main purpose of the study was to evaluate the performance of Top Spill Weirs installed at two spillbays at John Day Dam and evaluate the effectiveness of these surface flow outlets at attracting juvenile salmon away from the powerhouse and reducing turbine passage. The Juvenile Salmonid Acoustic Telemetry System (JSATS) was used to estimate survival of juvenile salmonids passing the dam and also for calculating performance metrics used to evaluate the efficiency and effectiveness of the dam at passing juvenile salmonids.

  15. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2004 - March 2005. Report C

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2006-01-01

    River discharge and water temperatures that occurred during April through July 2004 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Optimal spawning temperatures in the four tailraces occurred for 3-4 weeks and coincided with the peak of the river hydrograph. However, the peak of the hydrograph was relatively low compared to past years, which is reflected in the relatively low monthly and annual indices of suitable spawning habitat. Bottom-trawl sampling in the Bonneville Reservoir revealed the presence of young-of-theyear (YOY) white sturgeon.

  16. Cytokine gene expression in aborting and non-aborting dams and in their foetuses after experimental infection with Neospora caninum at 110 days of gestation.

    Science.gov (United States)

    Almeria, S; Serrano-Pérez, B; Darwich, L; Mur-Novales, R; Garcia-Ispierto, I; Cabezón, O; López-Gatius, F

    2016-08-30

    Neospora caninum is a major cause of abortion in cattle. However, it is not known why not all infected animals abort. In this study, Th1 (IFN-γ), Th2 (IL4) and T reg (IL-10) cytokine gene expression was examined by real time PCR using the TaqMan approach in all of these dams and their foetuses after experimental infection with the isolate Nc-Spain7 at 110 days of pregnancy and euthanasia 6 weeks after infection. In prior published work, foetal death was observed in three of six infected dams and transplacental infection in all the 6 infected foetuses. In the spleen of the dams, IL-4 expression was down-regulated in dams with aborted/non viable foetuses compared to both uninfected dams (controls, n=3) and infected dams with live fetuses at euthanasia. In the lymph nodes draining the placenta, up-regulated expression of IL-4 was observed in infected dams with live foetuses compared to control dams. In the placenta, infected dams with live foetuses had significantly up-regulated IFN-γ in both caruncle and cotyledon and up-regulated IL-10 in cotyledon compared to control dams. Infected live foetuses showed up-regulated expression of IFN-γ and IL-10 in foetal spleen, and showed downregulated expression of IL-4 in the thymus compared to control uninfected foetuses. Expression of any cytokine in the thymus was significantly lower compared to the levels observed in foetal spleen. The results indicate an up-regulated expression of Th1, Th2 and Treg in infected dams with live foetuses and in their foetuses. On the other hand, down-regulation of Th2 immune responses and Treg cytokines were observed in infected dams which had aborted or had non-viable foetuses at euthanasia, suggesting an immunological recovery of cytokine gene expression levels in dams a few weeks after an abortion occurred.

  17. Optimization of Concurrent Deployments of the Juvenile Salmon Acoustic Telemetry System and Other Hydroacoustic Equipment at John Day Dam

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Hughes, James S.; Khan, Fenton; Kim, Jina; Lamarche, Brian L.; Johnson, Gary E.; Choi, Eric Y.; Faber, Derrek M.; Wilberding, Matthew C.; Deng, Zhiqun; Weiland, Mark A.; Zimmerman, Shon A.; Fischer, Eric S.; Cushing, Aaron W.

    2008-09-01

    The purpose of this report is to document the results of the acoustic optimization study conducted at John Day Dam during January and February 2008. The goal of the study was to optimize performance of the Juvenile Salmon Acoustic Telemetry System (JSATS) by determining deployment and data acquisition methods to minimize electrical and acoustic interference from various other acoustic sampling devices. Thereby, this would allow concurrent sampling by active and passive acoustic methods during the formal evaluations of the prototype surface flow outlets at the dam during spring and summer outmigration seasons for juvenile salmonids. The objectives for the optimization study at John Day Dam were to: 1. Design and test prototypes and provide a total needs list of pipes and trolleys to deploy JSATS hydrophones on the forebay face of the powerhouse and spillway. 2. Assess the effect on mean percentage decoded of JSATS transmissions from tags arrayed in the forebay and detected on the hydrophones by comparing: turbine unit OFF vs. ON; spill bay OPEN vs. CLOSED; dual frequency identification sonar (DIDSON) and acoustic Doppler current profiler (ADCP) both OFF vs. ON at a spill bay; and, fixed-aspect hydroacoustic system OFF vs. ON at a turbine unit and a spill bay. 3. Determine the relationship between fixed-aspect hydroacoustic transmit level and mean percentage of JSATS transmissions decoded. The general approach was to use hydrophones to listen for transmissions from JSATS tags deployed in vertical arrays in a series perpendicular to the face of the dam. We used acoustic telemetry equipment manufactured by Technologic and Sonic Concepts. In addition, we assessed old and new JSATS signal detectors and decoders and two different types of hydrophone baffling. The optimization study consisted of a suite of off/on tests. The primary response variable was mean percentage of tag transmissions decoded. We found that there was no appreciable adverse effect on mean percentage

  18. Optimization of Concurrent Deployments of the Juvenile Salmon Acoustic Telemetry System and Other Hydroacoustic Equipment at John Day Dam

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Hughes, James S.; Khan, Fenton; Kim, Jina; Lamarche, Brian L.; Johnson, Gary E.; Choi, Eric Y.; Faber, Derrek M.; Wilberding, Matthew C.; Deng, Zhiqun; Weiland, Mark A.; Zimmerman, Shon A.; Fischer, Eric S.; Cushing, Aaron W.

    2008-09-01

    The purpose of this report is to document the results of the acoustic optimization study conducted at John Day Dam during January and February 2008. The goal of the study was to optimize performance of the Juvenile Salmon Acoustic Telemetry System (JSATS) by determining deployment and data acquisition methods to minimize electrical and acoustic interference from various other acoustic sampling devices. Thereby, this would allow concurrent sampling by active and passive acoustic methods during the formal evaluations of the prototype surface flow outlets at the dam during spring and summer outmigration seasons for juvenile salmonids. The objectives for the optimization study at John Day Dam were to: 1. Design and test prototypes and provide a total needs list of pipes and trolleys to deploy JSATS hydrophones on the forebay face of the powerhouse and spillway. 2. Assess the effect on mean percentage decoded of JSATS transmissions from tags arrayed in the forebay and detected on the hydrophones by comparing: turbine unit OFF vs. ON; spill bay OPEN vs. CLOSED; dual frequency identification sonar (DIDSON) and acoustic Doppler current profiler (ADCP) both OFF vs. ON at a spill bay; and, fixed-aspect hydroacoustic system OFF vs. ON at a turbine unit and a spill bay. 3. Determine the relationship between fixed-aspect hydroacoustic transmit level and mean percentage of JSATS transmissions decoded. The general approach was to use hydrophones to listen for transmissions from JSATS tags deployed in vertical arrays in a series perpendicular to the face of the dam. We used acoustic telemetry equipment manufactured by Technologic and Sonic Concepts. In addition, we assessed old and new JSATS signal detectors and decoders and two different types of hydrophone baffling. The optimization study consisted of a suite of off/on tests. The primary response variable was mean percentage of tag transmissions decoded. We found that there was no appreciable adverse effect on mean percentage

  19. Movements and Distribution of Northern Squawfish Downstream of Lower Snake River Dams Relative to the Migration of Juvenile Salmonids, 1992-1993 Completion Report.

    Energy Technology Data Exchange (ETDEWEB)

    Isaak, D.J.; Bjornn, T.C. (University of Idaho, Idaho Cooperative Fish and Wildlife Research Unit, Moscow, ID)

    1996-03-01

    Northern squawfish Ptychocheilus oregonensis movements were monitored downstream of two lower Snake River dams during the juvenile salmonid migrations of 1992 and 1993. During a high flow year in 1993, the abundance of squawfish in the tailrace of Lower Granite Dam peaked in July, after the majority of juveniles had moved past Lower Granite Dam, and peak abundance was inversely related to river discharge. Few squawfish moved into the tailrace of Ice Harbor Dam in 1993 because of the extended period of spill. Distributions of squawfish in the tailrace of Lower Granite Dam varied between and within years and shifted in response to changing prey densities, flow patterns, water temperature, and diel cycles, but fish consistently used low velocity habitats. Data from Ice Harbor Dam is less extensive, but squawfish distributions there appeared to be affected by changing flow patterns and fish used low velocity habitats. The changes in distribution and abundance of squawfish in tailrace areas are evidence that predation on seaward migrating salmonids depends on the timing of migration and size and timing of runoff. Juvenile salmonids migrating in the spring and early summer will probably be less affected by squawfish predation in tailrace areas than salmon that migrate later in the summer.

  20. Statistical evaluation of the effects of fall and winter flows on the spring condition of rainbow and brown trout in the green river downstream of Flaming Gorge Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Magnusson, A. K.; LaGory, K. E.; Hayse, J. W.; Environmental Science Division

    2009-01-09

    Flaming Gorge Dam, a hydroelectric facility operated by the Bureau of Reclamation (Reclamation), is located on the Green River in Daggett County, northeastern Utah. In recent years, single peak releases each day or steady flows have been the operational pattern during the winter period. A double-peak pattern (two flow peaks each day) was implemented during the winter of 2006-2007 by Reclamation. Because there is no recent history of double-peaking at Flaming Gorge Dam, the potential effects of double-peaking operations on the body condition of trout in the dam's tailwater are not known. A study plan was developed that identified research activities to evaluate potential effects from double-peaking operations during winter months. Along with other tasks, the study plan identified the need to conduct a statistical analysis of existing data on trout condition and macroinvertebrate abundance to evaluate potential effects of hydropower operations. This report presents the results of this analysis. We analyzed historical data to (1) describe temporal patterns and relationships among flows, benthic macroinvertebrate abundance, and condition of brown trout (Salmo trutta) and rainbow trout (Oncorhynchus mykiss) in the tailwaters of Flaming Gorge Dam and (2) to evaluate the degree to which flow characteristics (i.e., flow volumes and flow variability) and benthic macroinvertebrate abundance affect the condition of trout in this area. This information, together with further analyses of size-stratified trout data, may also serve as baseline data to which the effects of potential future double-peaking flows can be compared. The condition (length, weight and/or relative weight) of rainbow trout (Oncorhynchus mykiss) at two sites in the Green River downstream of Flaming Gorge Dam (Tailrace and Little Hole) and weight of brown trout (Salmo trutta) at the Little Hole site has been decreasing since 1990 while the abundance of brown trout has been increasing at the two sites. At

  1. Technical Review of the CENWP Computational Fluid Dynamics Model of the John Day Dam Forebay

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2010-12-01

    The US Army Corps of Engineers Portland District (CENWP) has developed a computational fluid dynamics (CFD) model of the John Day forebay on the Columbia River to aid in the development and design of alternatives to improve juvenile salmon passage at the John Day Project. At the request of CENWP, Pacific Northwest National Laboratory (PNNL) Hydrology Group has conducted a technical review of CENWP's CFD model run in CFD solver software, STAR-CD. PNNL has extensive experience developing and applying 3D CFD models run in STAR-CD for Columbia River hydroelectric projects. The John Day forebay model developed by CENWP is adequately configured and validated. The model is ready for use simulating forebay hydraulics for structural and operational alternatives. The approach and method are sound, however CENWP has identified some improvements that need to be made for future models and for modifications to this existing model.

  2. Performance of a surface bypass structure to enhance juvenile steelhead passage and survival at Lower Granite Dam, Washington

    Science.gov (United States)

    Adams, Noah S.; Plumb, John M.; Perry, Russell W.; Rondorf, Dennis W.

    2014-01-01

    An integral part of efforts to recover stocks of Pacific salmon Oncorhynchus spp. and steelhead O. mykiss in Pacific Northwest rivers is to increase passage efficacy and survival of juveniles past hydroelectric dams. As part of this effort, we evaluated the efficacy of a prototype surface bypass structure, the removable spillway weir (RSW), installed in a spillbay at Lower Granite Dam, Washington, on the Snake River during 2002, 2003, 2005, and 2006. Radio-tagged juvenile steelhead were released upstream from the dam and their route of passage through the turbines, juvenile bypass, spillway, or RSW was recorded. The RSW was operated in an on-or-off condition and passed 3–13% of the total discharge at the dam when it was on. Poisson rate models were fit to the passage counts of hatchery- and natural-origin juvenile steelhead to predict the probability of fish passing the dam. Main-effect predictor variables were RSW operation, diel period, day of the year, proportion of flow passed by the spillway, and total discharge at the dam. The combined fish passage through the RSW and spillway was 55–85% during the day and 37–61% during the night. The proportion of steelhead passing through nonturbine routes was 95% when the RSW was on during the day. The ratio of the proportion of steelhead passed to the proportion of water passing the RSW was from 6.3:1 to 10.0:1 during the day and from 2.7:1 to 5.2:1 during the night. Steelhead passing through the RSW exited the tailrace about 15 min faster than fish passing through the spillway. Mark–recapture single-release survival estimates for steelhead passing the RSW ranged from 0.95 to 1.00. The RSW appeared to be an effective bypass structure compared with other routes of fish passage at the dam.

  3. Simulation of Tailrace Hydrodynamics Using Computational Fluid Dynamics Models

    Energy Technology Data Exchange (ETDEWEB)

    Cook, Christopher B.; Richmond, Marshall C.

    2001-05-01

    This report investigates the feasibility of using computational fluid dynamics (CFD) tools to investigate hydrodynamic flow fields surrounding the tailrace zone below large hydraulic structures. Previous and ongoing studies using CFD tools to simulate gradually varied flow with multiple constituents and forebay/intake hydrodynamics have shown that CFD tools can provide valuable information for hydraulic and biological evaluation of fish passage near hydraulic structures. These studies however are incapable of simulating the rapidly varying flow fields that involving breakup of the free-surface, such as those through and below high flow outfalls and spillways. Although the use of CFD tools for these types of flow are still an active area of research, initial applications discussed in this report show that these tools are capable of simulating the primary features of these highly transient flow fields.

  4. Smolt Passage Behavior and Flow-Net Relationship in the Forebay of John Day Dam, 1984-1985 Final Report of Research.

    Energy Technology Data Exchange (ETDEWEB)

    Giorgi, Albert E.

    1985-12-01

    The migration routes of downstream migrant salmonids in the forebay of John Day Dam were defined and assessed in relation to current velocities and water turbidity and temperature. Forebay current patterns were obtained from current meters at fixed sampling stations, the distribution of outmigrants was determined from purse seine sampling, and migration routes of yearling chinook salmon and steelhead were identified by radio telemetry techniques. All species of emigrating salmonids alter their distribution across the forebay as they approach the dam. Fish abundance was positively correlated with water clarity. There was no evidence to suggest that the migration routes were in response to current patterns in the forebay. Radio telemetry studies demonstrated that a certain segment of yearling chinook salmon approaching the dam are predisposed to spill passage (Washington side of the river) by virtue of their lateral position across the forebay. A new application of radio tag methodology was assessed and found to be useful in evaluating the effectiveness of spill for bypassing outmigrant salmon. A program system and cartographic model was developed which displays for any specified hour forebay current patterns at prevailing river flows and dam operations. The system can be used at other dam sites where investigations may wish to detail forebay current patterns.

  5. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Faulkner, James R.; Smith, Steven G.; Muir, William D. [Northwest Fisheries Science Center

    2009-06-23

    In 2008, the National Marine Fisheries Service completed the sixteenth year of a study to estimate survival and travel time of juvenile salmonids Oncorhynchus spp. passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from detections of fish tagged with passive integrated transponder (PIT) tags. We PIT tagged and released a total of 18,565 hatchery steelhead O. mykiss, 15,991 wild steelhead, and 9,714 wild yearling Chinook salmon O. tshawytscha at Lower Granite Dam in the Snake River. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream from the hydropower system and at sites within the hydropower system in both the Snake and Columbia Rivers. These included 122,061 yearling Chinook salmon tagged at Lower Granite Dam for evaluation of latent mortality related to passage through Snake River dams. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, Ice Harbor, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using a statistical model for tag-recapture data from single release groups (the single-release model). Primary research objectives in 2008 were to: (1) estimate reach survival and travel time in the Snake and Columbia Rivers throughout the migration period of yearling Chinook salmon and steelhead, (2) evaluate relationships between survival estimates and migration conditions, and (3) evaluate the survival estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2008 for PIT-tagged yearling Chinook salmon (hatchery and wild), hatchery sockeye salmon O. nerka, hatchery coho salmon O. kisutch, and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Additional details on the methodology and statistical models used are provided in previous reports cited here. Survival

  6. Statistical evaluation of the effects of fall and winter flows on the spring condition of rainbow and brown trout in the green river downstream of Flaming Gorge Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Magnusson, A. K.; LaGory, K. E.; Hayse, J. W.; Environmental Science Division

    2009-01-09

    Flaming Gorge Dam, a hydroelectric facility operated by the Bureau of Reclamation (Reclamation), is located on the Green River in Daggett County, northeastern Utah. In recent years, single peak releases each day or steady flows have been the operational pattern during the winter period. A double-peak pattern (two flow peaks each day) was implemented during the winter of 2006-2007 by Reclamation. Because there is no recent history of double-peaking at Flaming Gorge Dam, the potential effects of double-peaking operations on the body condition of trout in the dam's tailwater are not known. A study plan was developed that identified research activities to evaluate potential effects from double-peaking operations during winter months. Along with other tasks, the study plan identified the need to conduct a statistical analysis of existing data on trout condition and macroinvertebrate abundance to evaluate potential effects of hydropower operations. This report presents the results of this analysis. We analyzed historical data to (1) describe temporal patterns and relationships among flows, benthic macroinvertebrate abundance, and condition of brown trout (Salmo trutta) and rainbow trout (Oncorhynchus mykiss) in the tailwaters of Flaming Gorge Dam and (2) to evaluate the degree to which flow characteristics (i.e., flow volumes and flow variability) and benthic macroinvertebrate abundance affect the condition of trout in this area. This information, together with further analyses of size-stratified trout data, may also serve as baseline data to which the effects of potential future double-peaking flows can be compared. The condition (length, weight and/or relative weight) of rainbow trout (Oncorhynchus mykiss) at two sites in the Green River downstream of Flaming Gorge Dam (Tailrace and Little Hole) and weight of brown trout (Salmo trutta) at the Little Hole site has been decreasing since 1990 while the abundance of brown trout has been increasing at the two sites. At

  7. Sensor Fish Characterization of Fish Passage Conditions through John Day Dam Spillbay 20 with a Modified Flow Deflector

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, Joanne P.

    2011-04-29

    Fish passage conditions over a modified deflector in Spillbay 20 at John Day Dam were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objectives of the study were to describe and compare passage exposure conditions at two spill discharges, 2.4 and 4.0 thousand cubic feet per second (kcfs), identifying potential fish injury regions within the routes, and to evaluate a low-tailwater condition at the 2.4-kcfs discharge. The study was performed in April 2010 concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish data were analyzed to estimate 1) exposure conditions, particularly exposure to severe collision and shear events; 2) differences in passage conditions between treatments; and 3) relationships to live-fish injury and mortality data estimates. Nearly all Sensor Fish significant events were classified as collisions; the most severe occurred at the gate, on the spillbay chute, or at the deflector transition. Collisions in the gate region were observed only during the 2.4-kcfs discharge, when the tainter gate was open 1.2 ft. One shear event was observed during the evaluation, occurring at the deflector transition during passage at the 2.4-kcfs discharge at low tailwater. Flow quality, computed using the Sensor Fish turbulence index, was best for passage at the low-flow low-tailwater condition as well. The worst flow quality was observed for the 4.0-kcfs test condition. Contrasting the passage exposure conditions, the 2.4-kcfs low-tailwater treatment would be most deleterious to fish survival and well-being.

  8. Linear Modeling and Regulation Quality Analysis for Hydro-Turbine Governing System with an Open Tailrace Channel

    Directory of Open Access Journals (Sweden)

    Jiandong Yang

    2015-10-01

    Full Text Available On the basis of the state–space method (SSM, a novel linear mathematical model of the unsteady flow for the tailrace system with an open channel is proposed. This novel model is an elastic linearized model of water hammer. The validity of the model has been verified by several examples of numerical simulation, which are based on a finite difference technique. Then, the complete mathematical model for the hydro-turbine governing system of hydropower station with an open tailrace channel, which is used for simulating the transient process of the hydro-turbine governing system under load disturbance, is established by combining the models of hydro-turbine, generator, governor and open tailrace channel. Finally, according to the complete model, the regulation quality for hydro-turbine governing system with an open tailrace channel under load disturbance is studied, and the effects of open tailrace channel and tailrace surge tank on regulation quality are analyzed. The results indicate that: The open tailrace channel has a strong influence on the regulation quality by observing the water level fluctuations in tailrace surge tank. The surge shows a piecewise periodical change along with the variation in the length of an open channel. The open tailrace channel can be used to improve the regulation quality of hydro-turbine governing system.

  9. Determining Columbia and Snake River Project Tailrace and Forebay Zones of Hydraulic Influence using MASS2 Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Perkins, William A.

    2010-12-01

    Although fisheries biology studies are frequently performed at US Army Corps of Engineers (USACE) projects along the Columbia and Snake Rivers, there is currently no consistent definition of the ``forebay'' and ``tailrace'' regions for these studies. At this time, each study may use somewhat arbitrary lines (e.g., the Boat Restriction Zone) to define the upstream and downstream limits of the study, which may be significantly different at each project. Fisheries researchers are interested in establishing a consistent definition of project forebay and tailrace regions for the hydroelectric projects on the lower Columbia and Snake rivers. The Hydraulic Extent of a project was defined by USACE (Brad Eppard, USACE-CENWP) as follows: The river reach directly upstream (forebay) and downstream (tailrace) of a project that is influenced by the normal range of dam operations. Outside this reach, for a particular river discharge, changes in dam operations cannot be detected by hydraulic measurement. The purpose of this study was to, in consultation with USACE and regional representatives, develop and apply a consistent set of criteria for determining the hydraulic extent of each of the projects in the lower Columbia and Snake rivers. A 2D depth-averaged river model, MASS2, was applied to the Snake and Columbia Rivers. New computational meshes were developed most reaches and the underlying bathymetric data updated to the most current survey data. The computational meshes resolved each spillway bay and turbine unit at each project and extended from project to project. MASS2 was run for a range of total river flows and each flow for a range of project operations at each project. The modeled flow was analyzed to determine the range of velocity magnitude differences and the range of flow direction differences at each location in the computational mesh for each total river flow. Maps of the differences in flow direction and velocity magnitude were created. USACE

  10. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2005 - March 2006. Report C.

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2007-01-01

    River discharge and water temperatures that occurred during April through July 2005 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Optimal spawning temperatures in the four tailraces occurred for 3-4 weeks and coincided with the peak of the river hydrograph. However, the peak of the hydrograph occurred in mid May and discharges dropped quickly and water temperature rose during June, which is reflected in the monthly and annual indices of suitable spawning habitat. Indices of available spawning habitat for the month of June 2005 were less than one-half of the average of the period from 1985-2004. Bottom-trawl sampling in the Bonneville Reservoir revealed the presence of young-of-the-year (YOY) white sturgeon but the proportion of positive tows was quite low at 0.06.

  11. Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

  12. Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01

    The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

  13. Computational Fluid Dynamics Modeling of The Dalles Project: Effects of Spill Flow Distribution Between the Washington Shore and the Tailrace Spillwall

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2010-12-01

    The U.S. Army Corps of Engineers-Portland District (CENWP) has ongoing work to improve the survival of juvenile salmonids (smolt) migrating past The Dalles Dam. As part of that effort, a spillwall was constructed to improve juvenile egress through the tailrace downstream of the stilling basin. The spillwall was designed to improve smolt survival by decreasing smolt retention time in the spillway tailrace and the exposure to predators on the spillway shelf. The spillwall guides spillway flows, and hence smolt, more quickly into the thalweg. In this study, an existing computational fluid dynamics (CFD) model was modified and used to characterize tailrace hydraulics between the new spillwall and the Washington shore for six different total river flows. The effect of spillway flow distribution was simulated for three spill patterns at the lowest total river flow. The commercial CFD solver, STAR-CD version 4.1, was used to solve the unsteady Reynolds-averaged Navier-Stokes equations together with the k-epsilon turbulence model. Free surface motion was simulated using the volume-of-fluid (VOF) technique. The model results were used in two ways. First, results graphics were provided to CENWP and regional fisheries agency representatives for use and comparison to the same flow conditions at a reduced-scale physical model. The CFD results were very similar in flow pattern to that produced by the reduced-scale physical model but these graphics provided a quantitative view of velocity distribution. During the physical model work, an additional spill pattern was tested. Subsequently, that spill pattern was also simulated in the numerical model. The CFD streamlines showed that the hydraulic conditions were likely to be beneficial to fish egress at the higher total river flows (120 kcfs and greater, uniform flow distribution). At the lowest flow case, 90 kcfs, it was necessary to use a non-uniform distribution. Of the three distributions tested, splitting the flow evenly between

  14. Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

    2008-03-12

    The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

  15. Dams (National)

    Data.gov (United States)

    Department of Transportation — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands (NTAD 2015). The map layer was created by extracting dams...

  16. VT High Risk Dam Inundation Areas

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) Preliminary release Storm-Day dam inundation areas digitized from various source Emergency Action Plans. These dams were prioritized for...

  17. THRESHOLD CONDITION FOR CHOCKING IN OPEN CHANNELS AND EXCAVATION OF TAILRACE

    Institute of Scientific and Technical Information of China (English)

    NI Han-gen; LIU Ya-kun

    2005-01-01

    On the basis of energy and continuity equations a general threshold condition for chocking in open channels is obtained and a representation in terms of the Froude number at the upstream section and other parameters is given to predict whether the chocking phenomenon occurs or not at the downstream section.From the general threshold condition for chocking the limit contraction ratios of the channel width are introduced for both with and without the energy losses and a criterion for excavation of the tailrace to avoid chocking is derived.An example shows that using these criterion and the representation proposed for calculating flow depth it is very easy to determine the scheme of the excavation of the open channels.

  18. Stability of earth dam with a vertical core

    Directory of Open Access Journals (Sweden)

    Orekhov Vyacheslav Valentinovich

    2016-01-01

    Full Text Available Earth dam with impervious element in the form of asphaltic concrete core is currently the most promising type of earth dams (due to simple construction technology and universal service properties of asphaltic concrete and is widely used in the world. However, experience in the construction and operation of high dams (above 160 m is not available, and their work is scarcely explored. In this regard, the paper discusses the results of computational prediction of the stress-strain state and stability of a high earth dam (256 m high with the core. The authors considered asphaltic concrete containing 7 % of bitumen as the material of the core. Gravel was considered as the material of resistant prisms. Design characteristics of the rolled asphaltic concrete and gravel were obtained from the processing of the results of triaxial tests. The calculations were performed using finite element method in elastoplastic formulation and basing on the phased construction of the dam and reservoir filling. The research shows, that the work of embankment dam with vertical core during filling of the reservoir is characterized by horizontal displacement of the lower resistant prism in the tailrace and the formation of a hard wedge prism descending along the core in the upper resistant prism. The key issue of the safety assessment is to determine the safety factor of the overall stability of the dam, for calculation of which the destruction of the earth dam is necessary, which can be done by reducing the strength properties of the dam materials. As a results of the calculations, the destruction of the dam occurs with a decrease in the strength characteristics of the materials of the dam by 2.5 times. The dam stability depends on the stability of the lower resistant prism. The destruction of its slope occurs on the classical circular-cylindrical surface. The presence of a potential collapse surface in the upper resistant prism (on the edges of the descending wedge does

  19. Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Lookout Point Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Hughes, James S.; Fischer, Eric S.; Trott, Donna M.; Ploskey, Gene R.

    2011-07-01

    -size fish passed through turbine penstock intakes. • Diel periodicity of smolt-size fish showing crepuscular peaks was evident in fish passage into turbine penstock intakes. • Run timing for small-size fish (~65-90 mm) peaked (702 fish) on December 18. Downstream passage of small-size juvenile fish was variable, occurring on two days in the spring, eight days in the summer, and at times throughout late fall and winter. A total of 7,017 ± 690 small-size fish passed through the turbine penstock intakes during the study period. • Relatively few fish passed into the ROs when they were open in summer (2 fish/d) and winter (8 fish/d). • Fish were surface-oriented with 62-80% above 10 m deep. The highest percentage of fish (30-60%) was in the 5-10 m depth bin. We draw the following conclusions from the study. • The non-obtrusive hydroacoustic data from this study are reliable because passage estimates and patterns were similar with those observed in the direct capture data from the tailrace screw trap and were consistent with distribution patterns observed in other studies of juvenile salmonid passage at dams. • Fish passage at LOP was apparently affected but not dominated by dam operations and reservoir elevation. • The surface-oriented vertical distribution of fish we observed supports development of surface passage or collector devices. In summary, the high-resolution spatially and temporally data reported herein provide detailed estimates of vertical, horizontal, diel, daily, and seasonal passage and distributions at LOP during March 2010 through January 2011. This information is applicable to management decisions on design and development of surface passage and collections devices to help restore Chinook salmon populations in the Middle Fork Willamette River watershed above Lookout Point Dam.

  20. Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume XV : Evaluation of the 2007 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime.

    Energy Technology Data Exchange (ETDEWEB)

    Griswold, Jim; Townsend, Richard L.; Skalski, John R.

    2008-12-01

    Program RealTime provided monitoring and forecasting of the 2007 inseason outmigrations via the internet for 26 PIT-tagged stocks of wild ESU Chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, one PIT-tagged wild stock of sockeye salmon to McNary Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville dams. Nineteen stocks are of wild yearling Chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2007 and have at least one year's historical migration data previous to the 2007 migration. These stocks originate in 19 tributaries of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through tag identification and monitored at Lower Granite Dam. Seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling Chinook salmon and the steelhead runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling Chinook, coho, and sockeye salmon, and steelhead forecasted to Rock Island, McNary, John Day, and Bonneville dams.

  1. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced techno

  2. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  3. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced techno

  4. Monitoring and Evaluation of Smolt Migration in the Columbia Basin, Volume XIV; Evaluation of 2006 Prediction of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead at Rock Island, Lower Granite, McNary, John Day and Bonneville Dams using Program Real Time, Technical Report 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Griswold, Jim

    2007-01-01

    Program RealTime provided monitoring and forecasting of the 2006 inseason outmigrations via the internet for 32 PIT-tagged stocks of wild ESU chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville Dams. Twenty-four stocks are of wild yearling chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2006, and have at least one year's historical migration data previous to the 2006 migration. These stocks originate in drainages of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through the tag identification and monitored at Lower Granite Dam. In addition, seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling chinook salmon and the steelhead trout runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling chinook, coho, and sockeye salmon, and steelhead trout forecasted to Rock Island, McNary, John Day, and Bonneville Dams.

  5. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual progress report April 2002 - March 2003. Report C

    Science.gov (United States)

    Gadomski, D.M.; Parsley, M.J.; Kofoot, P.

    2004-01-01

    During 1 April 2002 through 31 March 2003, the U.S. Geological Survey (USGS) continued work on several tasks, including quantifying habitat suitable for white sturgeon Acipenser transmontanus spawning, a long-term survey of young-of-the-year (YOY) white sturgeon recruitment in the lower Columbia River, and a laboratory study investigating predation on larval and juvenile white sturgeon. River discharge and water temperatures that occurred during April through July 2002 provided relatively good conditions for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Optimal spawning temperatures in the four tailraces occurred for approximately three weeks and during a period of relatively high river discharge. Our monthly estimates of the index of spawning habitat showed that the availability of habitat for spawning peaked in June at levels higher than the average of past years. However, indices for the month of May were less than average in all four tailraces. YOY white sturgeon were collected during bottom trawling in Bonneville and The Dalles reservoirs, but none were captured in the John Day Reservoir. In an ongoing comparison of indices of abundance derived from bottom trawls and gill nets, the Oregon Department of Fish and Wildlife also caught YOY white sturgeon in gill nets set in The Dalles Reservoir, but none in the John Day Reservoir. The third year of a three-year laboratory predation study was completed. Adult channel catfish ingested white sturgeon up to a mean total length of about 120 mm, and juvenile walleye ate white sturgeon up to a mean length of 53 mm. When white sturgeon and coho salmon were both available as prey, northern pikeminnow continued to ingest white sturgeon, but in most cases preferred salmon. Conversely, prickly sculpins preferred white sturgeon over goldfish as prey. The presence of cover and also lower light levels reduced predation by sculpins on white sturgeon larvae, but cover did not reduce

  6. Newfoundland and Labrador hydro dam safety management system : case study Long Pond Reservoir dam safety review[Includes the CSCE forum on professional practice and career development : 1. international engineering mechanics and materials specialty conference : 1. international/3. coastal, estuarine and offshore engineering specialty conference : 2. international/8. construction specialty conference

    Energy Technology Data Exchange (ETDEWEB)

    Poole, G. [Newfoundland and Labrador Hydro, St. John' s, NL (Canada); Woolgar, R. [Hatch Ltd., St. John' s, NL (Canada)

    2009-07-01

    Newfoundland and Labrador Hydro (Hydro) has an active Dam Safety Management (DSM) as part of its overall commitment to safety. The DSM is managed through Hydro's Engineering Department to ensure that all dams and hydraulic structures are operated and maintained in a safe manner to minimize risk to the public. Key elements of the program include employing a Dyke Board of Consultants to inspect structures annually, maintaining a dam inventory record, and surveillance, maintenance, and monitoring plans. The DSM program has recently been updated to include Dam Safety Reviews (DSR) in accordance with the Canadian Dam Association (CDA) Dam Safety Guidelines. A DSR is a systematic review and evaluation of all aspects of design, construction, operation, maintenance, processes, and other systems affecting a dam's safety. A DSR evaluates all components of the dams and hydraulic structures such dams, spillways, foundations, abutments, reservoir, and tailraces. In 2008, Hydro employed Hatch to conduct a DSR for Long Pond Reservoir that will form the basis of additional reviews to be completed in the future on other systems. The DSR showed that Hydro has an excellent DSM and the dams on Long Pond Reservoir are in compliance with the 2007 CDA Guidelines. 1 fig.

  7. PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS

    Energy Technology Data Exchange (ETDEWEB)

    Hadjerioua, Boualem [ORNL; Pasha, MD Fayzul K [ORNL; Stewart, Kevin M [ORNL; Bender, Merlynn [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers

    2012-07-01

    Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and

  8. Evaluation of juvenile salmonid behavior near a prototype weir box at Cowlitz Falls Dam, Washington, 2013

    Science.gov (United States)

    Kock, Tobias J.; Liedtke, Theresa L.; Ekstrom, Brian K.; Tomka, Ryan G.; Rondorf, Dennis W.

    2014-01-01

    salmon. Most fish spent several days in the dam forebay; median forebay residence times were 4.4 d for juvenile steelhead and 5.7 d for juvenile coho salmon. A new radio transmitter model was used during the study period. The transmitter had low detection probabilities on underwater antennas located within the collection system, which prevented us from reporting performance metrics (discovery efficiency, entrance efficiency, retention efficiency) that are traditionally used to evaluate fish collection systems. Most tagged steelhead (98 percent) and coho salmon (84 percent) were detected near the weir box or collection flume entrances during the study period; 39 percent of tagged steelhead and 55 percent of tagged coho salmon were detected at both entrances. Sixty-three percent of the tagged steelhead that were detected at both entrances were first detected at the weir box, compared to 52 percent of the coho salmon. Twelve steelhead and 15 coho salmon detected inside the weir box eventually left the device and were collected in collection flumes or passed the dam. Overall, collection rates were relatively high during the study period. Sixty-five percent of the steelhead and 80 percent of the coho salmon were collected during the study, and most of the remaining fish passed the dam and entered the tailrace (24 percent of steelhead; 13 percent of coho salmon). The remaining 11 percent of steelhead and 7 percent of coho salmon did not pass the dam while their transmitters were operating. We were able to confirm collection of tagged fish at the fish facility using three approaches: (1) detection of radio transmitters in study fish; (2) detection of PIT-tags in study fish; (3) observation of study fish by staff at the fish facility. Data from all three methods were used to develop a multistate mark-recapture model that estimated detection probabilities for the various monitoring methods. These estimates then were used to describe the percent of tagged fish that were collected

  9. Evaluation of Boundary Dam spillway using an Autonomous Sensor Fish Device

    Energy Technology Data Exchange (ETDEWEB)

    Deng, Z. D.; Duncan, J. P.; Arnold, J. L.; Fu, T.; Martinez, J.; Lu, J.; Titzler, P. S.; Zhou, D.; Mueller, R. P.

    2017-03-01

    Fish passage conditions over spillways are important for the operations of hydroelectric dams because spillways are usually considered as a common alternative passage route to divert fish from the turbines. The objectives of this study were to determine the relative potential of fish injury during spillway passage both before and after the installation of baffle blocks at Boundary Dam, and to provide validation data for a model being used to predict total dissolved gas levels. Sensor Fish were deployed through a release system mounted on the face of the dam in the forebay. Three treatments, based on the lateral position on the spillway, were evaluated for both the baseline and post-modification evaluations: Left Middle, Right Middle, and Right. No significant acceleration events were detected in the forebay, gate, or transition regions for any release location; events were only observed on the chute and in the tailrace. Baseline acceleration events observed in the chute region were all classified as strikes, whereas post-modification events included strike and shear on the chute. While the addition of baffle blocks increased the number of significant events observed on the spillway chute, overall fewer events were observed in the tailrace post-modification. Analysis of lateral positioning of passage indicated that the Right Middle treatment was potentially less injurious to fish based on relative frequency of significant events at each location. The construction of baffle blocks on the spillway visibly changed the flow regime. Prior to installation the flow jet was relatively thin, impacting the tailrace as a coherent stream that plunged deeply, possibly contributing to total dissolved gas production. Following baffle block construction, the discharge jet was more fragmented, potentially disrupting the plunge depth and decreasing the time that bubbles would be at depth in the plunge pool. The results in this study support the expected performance of the modified

  10. Characterizing the Fish Passage Environment at The Dalles Dam Spillway: 2001-2004

    Energy Technology Data Exchange (ETDEWEB)

    Richmond, Marshall C.; Carlson, Thomas J.; Serkowski, John A.; Cook, Chris B.; Duncan, Joanne P.; Perkins, William A.

    2007-10-10

    The spill environment at The Dalles Dam in 2001-2004 was characterized using a field-deployed autonomous sensor (the so-called Sensor Fish), computational fluid dynamics (CFD) modeling, and Lagrangian particle tracking. The sensor fish has a self-contained capability to digitally the record pressure and triaxial accelerations it was exposed to following its release into the spillway. After recovery downstream of the tailrace, the data stored in the memory of the sensor are downloaded and stored for analysis. The spillway, stilling basin, and tailrace hydrodynamics were simulated using an unsteady, free-surface, three-dimensional CFD code that solved the Reynolds-averaged Navier-Stokes equations in conjunction with a two-equation turbulence model. The results from the CFD simulations were then used in a Lagrangian particle tracking model that included the effects of mass, drag, and buoyancy in the particle equation of motion. A random walk method was used to simulate the effects of small-scale turbulence on the particle motion. Several operational and structural conditions were evaluated using the Sensor Fish, CFD, and particle tracking. Quantifying events such as strike and stilling basin retention time characterized exposure conditions in the spill environment.

  11. Alpine dams

    Directory of Open Access Journals (Sweden)

    Alain Marnezy

    2009-03-01

    Full Text Available Les barrages-réservoirs de montagne ont été réalisés initialement dans les Alpes pour répondre à la demande d’énergie en période hivernale. Une certaine diversification des usages de l’eau s’est ensuite progressivement développée, en relation avec le développement touristique des collectivités locales. Aujourd’hui, la participation des ouvrages d’Électricité De France à la production de neige de culture représente une nouvelle étape. Dans les régions où les aménagements hydroélectriques sont nombreux, les besoins en eau pour la production de neige peuvent être résolus par prélèvements à partir des adductions EDF. Les gestionnaires de stations échappent ainsi aux inconvénients liés à la construction et à la gestion des « retenues collinaires ». Cette évolution, qui concerne déjà quelques régions alpines comme la haute Maurienne ou le Beaufortin, apparaît comme une forme renouvelée d’intégration territoriale de la ressource en eau.Mountain reservoirs were initially built in the Alps to meet energy needs in the winter. A certain diversification in the uses of water then gradually developed, related to tourism development in the local communities. Today, the use of facilities belonging to EDF (French Electricity Authority to provide water for winter resorts to make artificial snow represents a new phase. By taking water from EDF resources to supply snow-making equipment, resort managers are thus able to avoid the problems related to the construction and management of small headwater dams. This new orientation in the use of mountain water resources already affects a number of alpine regions such as the Upper Maurienne valley and Beaufortain massif and represents a renewed form of the territorial integration of water resources.

  12. Synthesis of Juvenile Salmonid Passage Studies at The Dalles Dam, Volume II, 2001-05

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Beeman, John W.; Duran, Ian; Puls, Andrew

    2007-08-15

    The overall goal of juvenile salmonid research at The Dalles Dam is to provide data to inform decisions on strategies to improve smolt survival rates at the project. Survival improvement strategies address the three primary passage routes at The Dalles Dam -- spillway, sluiceway, and turbines – with the general intent to increase spill and sluice passage and decrease turbine passage. Since the review by Ploskey et al. (2001a) of research during 1982-2000 at The Dalles Dam, the Corps funded over $20M of research in at least 39 studies during 2001-2006. The purpose of the current review is to synthesize juvenile salmonid passage data at The Dalles Dam (TDA) collected from 2001 through 2006. The data we synthesize comes from numerous research techniques employed to address particular study objectives at The Dalles Dam. The suite of techniques includes acoustic and radio telemetry, acoustic cameras, acoustic Doppler current profilers, balloon tags, computational fluid dynamics models, drogues, fixed and mobile hydroacoustics, fyke nets, physical scale models, PIT-tags, sensor fish, sonar trackers, and underwater video. Hydraulic data involves flow patterns and water velocities. Biological data involve forebay approach paths and residence times, horizontal and diel distributions, passage efficiencies and effectiveness, fish behaviors, tailrace egress and predation rates, and route-specific and total project survival rates. Data for 2001-2006 are synthesized in this report to provide, in conjunction with Ploskey et al. (2001a), resources for engineers, biologists, and dam operators to use when making decisions about fish protection measures for juvenile salmonids at The Dalles Dam. This review covers the major fish passage research efforts during 2001-2006 and includes sections on the Environmental Setting, Forebay and Project Passage Studies, Spill Studies, Sluiceway Studies, Turbine Studies, Smolt Survival Studies, and a Discussion.

  13. Iran funds dam completion

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    Iran has signed a contract with unnamed foreign financiers for US$300M to fund two half-finished dam schemes, according to Tehran radio. The schemes are the Ostur dam in Mianeh in East Azerbaijan province and the Molla Sadra dam in Fars province. The Ostur dam will have a storage capacity of 2B m3 and a 160 MW hydro power station.

  14. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam Report C, Annual Progress Report April 2003 - March 2004

    Science.gov (United States)

    Parsley, Michael J.; Gadomski, Dena M.; Kofoot, Pete

    2005-01-01

    River discharge and water temperatures that occurred during April through July 2003 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Although optimal spawning temperatures in the four tailraces occurred for less than two weeks, they coincided with a period of relatively high river discharge. Bottom-trawl sampling in Bonneville and The Dalles Reservoirs revealed the presence of young-of-the-year (YOY) white sturgeon in Bonneville Reservoir, but none were captured in The Dalles Reservoir. A comparison of five years of indices of abundance of YOY sturgeon from sampling done by ODFW with gillnets and the USGS with bottom trawls was completed. Despite obvious differences in gear sampling characteristics (e.g. one gear is actively fished, one passively fished), it appears that either gear can be used to assess relative trends in YOY white sturgeon abundance. The analyses suffered due to poor catches of YOY fish, as YOY were only captured in The Dalles Reservoir during three of the five years of comparison sampling, and during only one of four years in John Day Reservoir. However, both gears detected the presence or absence of YOY white sturgeon within a reservoir equally. That is, if any YOY white sturgeon were captured in any year in a reservoir, both gears captured at least one fish, and if one gear failed to collect any YOY white sturgeon, both gears failed. Concerns have been raised that the Wang et al. (1985) egg development relationships for Sacramento River white sturgeon may not be applicable to Columbia Basin stocks. However, using laboratory experiments with white sturgeon eggs incubated at 10, 12, 15, and 18o C, we found no significant differences in development rates of eggs of Columbia, Kootenai, Snake, and Sacramento river fish.

  15. Hoover Dam Learning Packet.

    Science.gov (United States)

    Bureau of Reclamation (Dept. of Interior), Washington, DC.

    This learning packet provides background information about Hoover Dam (Nevada) and the surrounding area. Since the dam was built at the height of the Depression in 1931, people came from all over the country to work on it. Because of Hoover Dam, the Colorado River was controlled for the first time in history and farmers in Nevada, California, and…

  16. Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

    2005-06-01

    This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

  17. Dam removal: Listening in

    Science.gov (United States)

    Foley, Melissa M.; Bellmore, James; O'Connor, James E.; Duda, Jeff; East, Amy E.; Grant, Gordon G.; Anderson, Chauncey; Bountry, Jennifer A.; Collins, Mathias J.; Connolly, Patrick J.; Craig, Laura S.; Evans, James E.; Greene, Samantha; Magilligan, Francis J.; Magirl, Christopher S.; Major, Jon J.; Pess, George R.; Randle, Timothy J.; Shafroth, Patrick B.; Torgersen, Christian; Tullos, Desiree D.; Wilcox, Andrew C.

    2017-01-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (methods in the U.S.

  18. The Dalles Dam, Columbia River: Spillway Improvement CFD Study

    Energy Technology Data Exchange (ETDEWEB)

    Cook, Chris B.; Richmond, Marshall C.; Serkowski, John A.

    2006-06-01

    This report documents development of computational fluid dynamics (CFD) models that were applied to The Dalles spillway for the US Army Corps of Engineers, Portland District. The models have been successfully validated against physical models and prototype data, and are suitable to support biological research and operations management. The CFD models have been proven to provide reliable information in the turbulent high-velocity flow field downstream of the spillway face that is typically difficult to monitor in the prototype. In addition, CFD data provides hydraulic information throughout the solution domain that can be easily extracted from archived simulations for later use if necessary. This project is part of an ongoing program at the Portland District to improve spillway survival conditions for juvenile salmon at The Dalles. Biological data collected at The Dalles spillway have shown that for the original spillway configuration juvenile salmon passage survival is lower than desired. Therefore, the Portland District is seeking to identify operational and/or structural changes that might be implemented to improve fish passage survival. Pacific Northwest National Laboratory (PNNL) went through a sequence of steps to develop a CFD model of The Dalles spillway and tailrace. The first step was to identify a preferred CFD modeling package. In the case of The Dalles spillway, Flow-3D was as selected because of its ability to simulate the turbulent free-surface flows that occur downstream of each spilling bay. The second step in development of The Dalles CFD model was to assemble bathymetric datasets and structural drawings sufficient to describe the dam (powerhouse, non-overflow dam, spillway, fish ladder entrances, etc.) and tailrace. These datasets are documented in this report as are various 3-D graphical representations of The Dalles spillway and tailrace. The performance of the CFD model was then validated for several cases as the third step. The validated model

  19. Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume IX : Evaluation of the 2001 Predictions of the Run-Timing of Wild and Hatchery-Reared Migrant Salmon and Steelhead Trout Migrating to Lower Granite, Rock Island, McNary, and John Day Dams using Program RealTime.

    Energy Technology Data Exchange (ETDEWEB)

    Burgess, Caitlin; Skalski, John R.

    2001-12-01

    Program RealTime provided tracking and forecasting of the 2001 inseason outmigration via the internet for eighteen PIT-tagged stocks of wild salmon and steelhead to Lower Granite and/or McNary dams and eleven passage-indexed stocks to Rock Island, McNary, or John Day dams. Nine of the PIT-tagged stocks tracked this year were new to the project. Thirteen ESUs of wild subyearling and yearling chinook salmon and steelhead, and one ESU of hatchery-reared sockeye salmon were tracked and forecasted to Lower Granite Dam. Eight wild ESUs of subyearling and yearling chinook salmon, sockeye salmon and steelhead were tracked to McNary Dam for the first time this year. Wild PIT-tagged ESUs tracked to Lower Granite Dam included yearling spring/summer chinook salmon release-recovery stocks (from Bear Valley Creek, Catherine Creek, Herd Creek, Imnaha River, Johnson Creek, Lostine River, Minam River, South Fork Salmon River, Secesh River, and Valley Creek), PIT-tagged wild runs-at-large of yearling chinook salmon and steelhead, and a PIT-tagged stock of subyearling fall chinook salmon. The stock of hatchery-reared PIT-tagged summer-run sockeye salmon smolts outmigrating to Lower Granite Dam, consisted this year of a new stock of fish from Alturas Lake Creek, Redfish Lake Creek Trap and Sawtooth Trap. The passage-indexed stocks, counted using FPC passage indices, included combined wild- and hatchery-reared runs-at-large of subyearling and yearling chinook, coho, and sockeye salmon, and steelhead migrating to Rock Island and McNary dams, and, new this year, combined wild and hatchery subyearling chinook salmon to John Day Dam. Unusual run-timing and fish passage characteristics were observed in this low-flow, negligible-spill migration year. The period for the middle 80% of fish passage (i.e., progress from the 10th to the 90th percentiles) was unusually short for nine out of ten PIT-tagged yearling spring/summer chinook salmon stocks tracked to Lower Granite Dam. It was the

  20. Dam to the Rescue

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    The Three Gorges Dam relieves the summer drought in south and central China,but may contribute to other problems The Three Gorges Dam played an important role in relieving China’s drought in central and eastern prov-inces that had been using increased water discharges from the Dam to irrigate dry farmlands facing the worst drought int he last 60 years in 2011.

  1. The expected collapse of a large dam Saddam Dam in Iraq; Un grand barrage a haut risque Saddam Dam en Irak

    Energy Technology Data Exchange (ETDEWEB)

    Mesny, M. [Conseil general du genie rural, des eaux et des forets, 75 - Paris (France)

    2004-07-01

    The Saddam dam is a very large dam in Iraq on the Tigris River, 80 kilometres upstream from the city of Mosul. It is a fill dam with a clayey silt core. The height of the dam is 120 meters and the capacity of the reservoir is 11 billions m3. But this dam has been built on foundations of gypsum that is a rock soluble in water. The impounding of the reservoir in 1986 has shown that, in spite of the grout curtain, substantial seepage has occurred (up to 1.4 m{sup 3}/s), as well as the dissolution of minerals from foundations (up to 80 tons per day). The substantial increase in permeability and seepage through the dam foundations results in a severe concern about the stability of the dam. The program of injection has been stopped in 1991, due to the circumstances. So there is a real risk that this dam would collapse through a quickly developing leak in the dike, resulting in the devastation of the rich agricultural valley of the Tigris River and in potential human losses at Mosul. A 10 to 20-meter high submersion wave would reach this town 3 to 4 hours after the collapse of the dam. An international action is urgently required to check the conditions of the dam and to propose remedial solutions, which may be a 120-meter deep concrete wall down to the calcareous floor existing below the soluble layers of the foundations. (author)

  2. Living with dams

    NARCIS (Netherlands)

    H.L.F. Saeijs (Henk); K.D. Schuijt (Kirsten)

    2002-01-01

    textabstractDams have proven their usefulness in preventing and mitigating floods, and water scarcity and generating electricity. They are indispensable in present society. But at the same time, they cause serious ecological, social and economical problems. Consequently we have to live with a dams

  3. Allegheny County Dam Locations

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset shows the point locations of dams in Allegheny County. If viewing this description on the Western Pennsylvania Regional Data Center’s open data portal...

  4. Dams: Pros and Cons

    African Journals Online (AJOL)

    Steve

    The Dam was built for the main purpose of water supply to university community. Data on .... The decision on who is to participate in a full EIA on a water ... METHOD AND MATERIALS ..... Development”, Encyclopedia of Life Support Systems,.

  5. Survival of juvenile chinook salmon and coho salmon in the Roza Dam fish bypass and in downstream reaches of the Yakima River, Washington, 2016

    Science.gov (United States)

    Kock, Tobias J.; Perry, Russell W.; Hansen, Amy C.

    2016-12-22

    Estimates of juvenile salmon survival are important data for fishery managers in the Yakima River Basin. Radiotelemetry studies during 2012–14 showed that tagged juvenile Chinook salmon (Oncorhynchus tshawytscha) that passed through the fish bypass at Roza Dam had lower survival than fish that passed through other routes at the dam. That study also identified flow-survival relationships in the reaches between the Roza Dam tailrace and Sunnyside Dam. During 2012–14, survival also was estimated through reaches downstream of Sunnyside Dam, but generally, sample sizes were low and the estimates were imprecise. In 2016, we conducted an evaluation using acoustic cameras and acoustic telemetry to build on information collected during the previous study. The goal of the 2016 research was to identify areas where mortality occurs in the fish bypass at Roza Dam, and to estimate reach-specific survival in reaches downstream of the dam. The 2016 study included juvenile Chinook salmon and coho salmon (O. kisutch).Three acoustic cameras were used to observe fish behavior (1) near the entrances to the fish bypass, (2) at a midway point in the fish bypass (convergence vault), and (3) at the bypass outfall. In total, 504 hours of acoustic camera footage was collected at these locations. We determined that smolt-sized fish (95–170 millimeters [mm]) were present in the highest proportions at each location, but predator-sized fish (greater than 250 mm) also were present at each site. Fish presence generally peaked during nighttime hours and crepuscular periods, and was low during daytime hours. In the convergence vault, smolt-sized fish exhibited holding behavior patterns, which may explain why some fish delayed while passing through the bypass.Some of the acoustic-tagged fish were delayed in the fish bypass following release, but there was no evidence to suggest that they experienced higher mortality than fish that were released at the bypass outfall or downstream of the dam

  6. Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

    2013-07-31

    This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

  7. Environmental and dam effects on cannibalism in Wistar rat litters

    Directory of Open Access Journals (Sweden)

    Graziela Tarôco

    2015-08-01

    Full Text Available The factors related to cannibalistic behavior of dams in a Wistar rat colony are identified and analyzed. The maternal genetic effects were tested as a random effect by the method of generalized linear models. The season at parturition, the dam´s age at parturition and the density of the room at parturition were tested as fixed effects, whereas the litter size at birth was tested as a co-variable. The genetic effect of the dam was significant for the number of cannibalized pups. Although the season at parturition, the dam´s age and room density on the day of parturition were not individually significant (p > 0.05, most of the interactions between the variation sources were significant (p < 0.05. Cannibalism occurred mostly in dams aged over 241 days, with parturition during spring. So that occurrences of cannibalism could be avoided, dams with the smallest number of cannibalized pups should be selected, coupled to dams younger than 241 days, breeding during spring. The above strategies may reduce the number of couples in the vivarium and increase their production efficiency.

  8. Effect of rubber dam on mercury exposure during amalgam removal.

    Science.gov (United States)

    Kremers, L; Halbach, S; Willruth, H; Mehl, A; Welzl, G; Wack, F X; Hickel, R; Greim, H

    1999-06-01

    It was the aim of this investigation to treat 20 volunteers with maximally 5 amalgam fillings by the same comprehensive protocol in which all removals with (n = 8) and without (n = 12) rubber dam had been performed within a few months. Nine amalgam-related parameters indicated a close matching of both groups before removal. In the group without rubber dam, mercury (Hg) levels in plasma increased significantly above preremoval values at days 1 and 3 after removal; they decreased significantly below preremoval values at day 30 in the rubber-dam group and at day 100 in both groups. Excretion rates did not increase significantly in either group, but decreased significantly at day 100 in the protected group. Peak plasma-Hg was 0.6 ng/mL on average at day one and decreased with halftimes of 3 and 43 d in subjects protected by rubber dam. The results indicated that concentrations of total mercury in plasma responded rapidly to changes in the amalgam status and reflected the actual absorption most reliably. Notably, plasma-Hg levels were sensitive enough to detect a transient attenuation of the additional exposure by using rubber dam during the removal of only a few fillings. However, being small in magnitude and lasting 100 d at best, the rubber-dam effect had minor toxicological relevance.

  9. Dynamic decision making for dam-break emergency management – Part 2: Application to Tangjiashan landslide dam failure

    Directory of Open Access Journals (Sweden)

    M. Peng

    2013-02-01

    Full Text Available Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR. The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  10. Quasi-stable Slope-Failure Dams in High Asia

    Science.gov (United States)

    Shroder, J. F.

    2010-12-01

    Collapses of steep mountain slopes in the Himalaya, Karakoram, Pamir, Hindu Kush, and Tibetan Plateau are well known as a result of:(1) generally high seismicity in active tectonic areas; (2) prior deglaciation leaving undercut, unstable cliffs; (3) present-day debuttressing of rock cliffs by glacial down-wasting in conditions of global warming; and (4) degradation of permafrost cohesion and water-ice cementation in high mountain slopes. Landslide dams across mountain rivers are also well known worldwide and generally do not endure for long because of the common landslide-lake outburst floods (LLOF) whose discharge is commonly sufficiently large to remove much of the dam in a short time. A number of massive slope-failure dams in south High Asia, however, have endured for centuries and require explanations for the length of duration, whereas recent examples require robust assessment for better predictive hazard analysis. Three main factors contribute to longevity of slope-failure dams: (1) mega-rocks >15-30 m that inhibit dam failure in overflow breaches; (2) mega-porosity wherein incoming discharge to the landslide lake is balanced by subterranean water through-flow within the landslide dam; (3) impermeable clay fills caused by remobilization of prior lacustrine-dammed sediment that impart dam strength to allow lasting integrity for a time, and (4) climate-change induced lake-level lowering. Several examples of long-lived or unusually stable, slope-failure dams associated with pronounced structural/tectonic associations include: (1) Pangong Tso, Ladakh and Tibet; (2) Lake Shewa, Afghanistan; (3) Sarez Lake, Tajikistan; and (4) Lake Hunza, Pakistan. Pangong Tso and Lake Shewa were emplaced thousands of years ago and only Lake Shewa shows some instability of the dam front where percolating water maintains lake level but may be causing new slumping. Sarez Lake behind the Usoi landslide dam was emplaced by an earthquake in 1911 and maintains its level by seepage. Lake

  11. Dam safety in British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, H.M.; Round, R.P.D.

    1978-01-01

    Many dams in British Columbia were built before 1900, and a comprehensive inspection and surveillance program has been developed. The background and implementation of this program are described. Topics discussed include program responsibilities, classification of dams, organization, the dam safety program, and coordination with other agencies. (PMA)

  12. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    considered within the model. The results of the hydrologic simulations indicated that for all hydrologic conditions scenarios, the Lago El Guineo Dam would not experience overtopping. For the dam breach hydraulic analysis, failure by piping was the selected hypothetical failure mode for the Lago El Guineo Dam.Results from the simulated dam failure of the Lago El Guineo Dam using the HEC–RAS model for the 6- and 24-hour probable maximum precipitation events indicated peak discharges below the dam of 1,342.43 and 1,434.69 cubic meters per second, respectively. Dam failure during the 24-hour, 100-year recurrence rainfall event resulted in a peak discharge directly downstream from Lago El Guineo Dam of 1,183.12 cubic meters per second. Dam failure during sunny-day conditions (no precipitation) produced a peak discharge at Lago El Guineo Dam of 1,015.31 cubic meters per second assuming the initial water-surface elevation was at the morning-glory spillway invert elevation.The results of the hydraulic analysis indicate that the flood would extend to many inhabited areas along the stream banks from the Lago El Guineo Dam to the mouth of the Río Grande as a result of the simulated failure of the Lago El Guineo Dam. Low-lying regions in the vicinity of Ciales, Manatí, and Barceloneta, Puerto Rico, are among the regions that would be most affected by failure of the Lago El Guineo Dam. Effects of the flood control (levee) structure constructed in 2000 to provide protection to the low-lying populated areas of Barceloneta, Puerto Rico, were considered in the hydraulic analysis of dam failure. The results indicate that overtopping can be expected in the aforementioned levee during 6- and 24-hour probable maximum precipitation events. The levee was not overtopped during dam failure scenarios under the 24-hour, 100-year recurrence rainfall event or sunny-day conditions.

  13. White sturgeon (Acipenser transmontanus) passage at the Dalles Dam, Columbia River, USA

    Science.gov (United States)

    Parsley, M.J.; Wright, C.D.; Van Der Leeuw, B. K.; Kofoot, E.E.; Peery, C.A.; Moser, M.L.

    2007-01-01

    White sturgeon (Acipenser transmontanus) ???95 cm TL were monitored using acoustic and radio telemetry at a large hydroelectric dam (the Dalles Dam) on the Columbia River, during March 2004 through November 2005 to determine timing and routes of passage and to characterize general movements. Transmitters were surgically implanted into 148 fish during the study; 90 were released into the tailrace and 58 into the forebay. We documented 26 passage events by 19 tagged fish: eight upstream via fish ladders and 18 downstream, mostly through open spill gates. During the study 17 fish entered the two ladders one or more times; 11 entered only the east ladder, three entered only the north ladder, and three entered both ladders at sometime. Residence time within the ladders by individual fish was variable, ranging from about 1 min to nearly 6 months (median = 7.7 h). Only six fish successfully ascended the east ladder, one fish twice. We could not unequivocally determine which fish ladder one fish used to pass upstream. Differences in construction between the north and east fish ladders may account for the greater success of the east fish ladder in passing sturgeon upstream. Changes to operations at hydroelectric dams to benefit migrating anadromous salmonids may influence upstream or downstream passage by white sturgeon. Altering patterns and timing of spill discharge, altering fish ladder entrance attraction flows, and the use of lights, sound, and partial barriers to direct other species of fish to preferred passage routes have unknown effects on sturgeon passage. A better understanding of the consequences to the metapopulation of increasing or precluding upstream or downstream passage is needed. ?? 2007 The Authors.

  14. Geodetic and Non-Geodetic Methods for Deformation Monitoring of Rock-Fill Dams, a Case Study at Ataturk DAM

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2012-12-01

    Necessity to water is increasing day by day with respect to the World population, rising of living standards and destruction of nature. Water resources have to be controlled and supplied for agricultural uses, drinking and industrial purposes by the countries having limited water resources. This situation is also considerable for Turkey which has a location in the middle zone of World and having limited water sources. Dams are among the most important engineering structures which are used for these purposes. However, the functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Deformation measurements have an important status among various engineering surveying. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the horizontal and vertical small structural motions at regular intervals could be comprehended. Ataturk Dam in Turkey is the 6th largest dam of world considering the filling volume of embankment. Deformation of Ataturk Dam is being monitoring yearly since 2006 by Istanbul Technical University Department of Geomatics Engineering. We apply both GPS and conventional techniques. In this study, we present the result of radial deformations on Ataturk Dam between 2006 and 2010. The results show significant horizontal movements among the 72% of object points. Maximum movement is found as 14.12 cm (with a radial component of 14.08 cm) in 4.5 years.

  15. Thermal effects of dams in the Willamette River basin, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2010-01-01

    where the annual maximum temperature typically occurred in September or October. Without-dam temperatures also tended to have more daily variation than with-dam temperatures. Examination of the without-dam temperature estimates indicated that dam sites could be grouped according to the amount of streamflow derived from high-elevation, spring-fed, and snowmelt-driven areas high in the Cascade Mountains (Cougar, Big Cliff/Detroit, River Mill, and Hills Creek Dams: Group A), as opposed to flow primarily derived from lower-elevation rainfall-driven drainages (Group B). Annual maximum temperatures for Group A ranged from 15 to 20 degree(s)C, expressed as the 7-day average of the daily maximum (7dADM), whereas annual maximum 7dADM temperatures for Group B ranged from 21 to 25 degrees C. Because summertime stream temperature is at least somewhat dependent on the upstream water source, it was important when estimating without-dam temperatures to use correlations to sites with similar upstream characteristics. For that reason, it also is important to maintain long-term, year-round temperature measurement stations at representative sites in each of the Willamette River basin's physiographic regions. Streamflow and temperature estimates downstream of the major dam sites and throughout the Willamette River were generated using existing CE-QUAL-W2 flow and temperature models. These models, originally developed for the Willamette River water-temperature Total Maximum Daily Load process, required only a few modifications to allow them to run under the greatly reduced without-dam flow conditions. Model scenarios both with and without upstream dams were run. Results showed that Willamette River streamflow without upstream dams was reduced to levels much closer to historical pre-dam conditions, with annual minimum streamflows approximately one-half or less of dam-augmented levels. Thermal effects of the dams varied according to the time of year, from cooling in mid-summer to warm

  16. Effects of Hypergravity Exposure On Plasma Oxytocin Concentrations In Pregnant and Lactating Rat Dams

    Science.gov (United States)

    Baer, Lisa A.; Wade, Charles E.; Ronca, April E.; Dalton, Bonnie (Technical Monitor)

    2002-01-01

    Rat dams and offspring were exposed to 1.5-g, 1.75-g or 2.0-g hypergravity (hg) from Gestational day (G) 11 until Postnatal day (P) 10. To ascertain the role of maternal factors in reduced postnatal body weights of offspring developed in hg, the dams' lactational hormones were measured. Oxytocin (OT), the major hormone responsible for milk ejection, was reduced in hg dams whereas prolactin (Prl), involved in milk production, was unchanged. Video analyses of nursing behavior revealed that hg dams spent more time nursing relative to 1-g controls. We hypothesized impaired milk transfer from dam to pup, however pup body weight gains following a discrete suckling episode were comparable across conditions. Changes in lactational hormones and nursing behavior by dams exposed to hg do not account for reduced body masses of their offspring.

  17. USGS Dam Removal Science Database

    Science.gov (United States)

    Bellmore, J. Ryan; Vittum, Katherine; Duda, Jeff J.; Greene, Samantha L.

    2015-01-01

    This database is the result of an extensive literature search aimed at identifying documents relevant to the emerging field of dam removal science. In total the database contains 179 citations that contain empirical monitoring information associated with 130 different dam removals across the United States and abroad. Data includes publications through 2014 and supplemented with the U.S. Army Corps of Engineers National Inventory of Dams database, U.S. Geological Survey National Water Information System and aerial photos to estimate locations when coordinates were not provided. Publications were located using the Web of Science, Google Scholar, and Clearinghouse for Dam Removal Information.

  18. The dam design of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    Wang Xiaomao; Xu Linxiang; Liao Renqiang

    2011-01-01

    The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m, the maximum height of 181 m and dam axis length of 2 309.5 m. The dam consists of spillway, powerhouse, non-over flow, ship-lift, temporary ship-lock, left diversion wall and longitudinal cofferdam blocks. Some key techniques relating to dam structure design are presented, including hydraulics of flood discharge structure, dam joint design, layout and structural type of penstock, deep anti-sliding stability of dam foundation, reconstruction of temporary ship-lock and closed drainage and pumping of dam foundation.

  19. Monitoring and Evaluation of Yearling Fall Chinook Salmon Released from Acclimation Facilities Upstream of Lower Granite Dam; 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rocklage, Stephen J. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

    2004-01-01

    the 1,253 PIT tagged fish released, a total of 719 unique tags were detected at mainstem Snake and Columbia River dams. A total of 2,420 yearlings were PIT tagged and released at Lyons Ferry Hatchery. PIT tagged yearlings had a mean fork length of 159.0 mm and mean condition factor of 1.10. Of the 2,420 PIT tagged fish released, a total of 979 unique tags were detected at mainstem Snake and Columbia River dams (Lower Monumental and McNary). Median travel times, based on all detections, of PIT tagged fish released from Pittsburg Landing were 10.5 days to Lower Granite Dam, 21.7 days to McNary Dam and 29.8 days to Bonneville Dam. Median migration rates were 16.4 rkm/d to Lower Granite Dam, 18.3 rkm/d to McNary Dam and 18.9 rkm/d to Bonneville Dam. The median arrival dates were April 25 at Lower Granite Dam, May 6 at McNary Dam and May 14 at Bonneville Dam. The 90% passage dates were May 5 at Lower Granite Dam, May 20 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 9.5 fpp yearlings released from Big Canyon were 13.3 days to Lower Granite Dam, 26.0 days to McNary Dam and 30.8 days to Bonneville Dam. Median migration rates were 13.0 rkm/d to Lower Granite Dam, 15.3 rkm/d to McNary Dam and 18.3 rkm/d to Bonneville Dam. The median arrival dates were April 27 at Lower Granite Dam, May 11 at McNary Dam and May 15 at Bonneville Dam. The 90% passage dates were May 9 at Lower Granite Dam, May 24 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 30 fpp yearlings released from Big Canyon were 20.8 days to Lower Granite Dam, 37.6 days to McNary Dam and 43.5 days to Bonneville Dam. Median migration rates were 8.3 rkm/d to Lower Granite Dam, 10.6 rkm/d to McNary Dam and 12.9 rkm/d to Bonneville Dam. The median arrival dates were May 5 at Lower Granite Dam, May 23 at McNary Dam and May 28 at Bonneville Dam. The 90% passage dates were May 22 at Lower Granite Dam, May 31 at Mc

  20. Tarbela Dam Project

    Energy Technology Data Exchange (ETDEWEB)

    Khan, B.A. [WAPDA Tarbela Dam Project (Pakistan); Ahmad, W. [Siemens Pakistan Ltd., Islamabad (Pakistan)

    1999-07-01

    Construction of one of the world's largest water resource development project is discussed. The Tarbela project is built on the Indus River, (itself one of the largest rivers of the world) and consists of a 9,000 feet long and 465 feet high earth and rockfill embankment across the entire width of the river with two spillways cutting through the left bank. On the left bank valley there are two auxiliary embankment dams to close the gap. A total of five tunnels, each a mile long, have been constructed for irrigation releases and power generation. Electricity is being generated by two power generating plants constructed on three of these tunnels. They have a generating capacity of 3,478 MW, supplying 40 per cent of all Pakistani demand. Several 'firsts' are identified. For example, the dam is the world's largest, containing over 200 million cubic yards of earth and rock, as are the five tunnels (14 meters in diameter), as well as the outlet gates. The energy release by the water gushing through the five tunnels at maximum level is more than 13 million KW, approximately equivalent to 10 million horsepower. 1 ref.

  1. Determination of Seepage and Analysis of Earth Dams (Case Study: Karkheh Dam)

    OpenAIRE

    A. Kamanbedast; M. Shahosseini

    2011-01-01

    Because of the increasing trend of building dam throughout Iran; it is necessary to optimize dam buildings and operations. Dam or Hydropower industry has two types of buildings; normally: (1) Concrete dams (2) Embankment (earth) dams. Generally, scientists and engineers use different methods to enhance safety and decrease any errors in calculation due to maintenance of water storage especially hydro structure of the dam. It is necessary to investigate the dam seepage control; commonly use...

  2. A pre-dam-removal assessment of sediment transport for four dams on the Kalamazoo River between Plainwell and Allegan, Michigan

    Science.gov (United States)

    Syed, Atiq U.; Bennett, James P.; Rachol, Cynthia M.

    2005-01-01

    Four dams on the Kalamazoo River between the cities of Plainwell and Allegan, Mich., are in varying states of disrepair. The Michigan Department of Environmental Quality (MDEQ) and U.S. Environmental Protection Agency (USEPA) are considering removing these dams to restore the river channels to pre-dam conditions. This study was initiated to identify sediment characteristics, monitor sediment transport, and predict sediment resuspension and deposition under varying hydraulic conditions. The mathematical model SEDMOD was used to simulate streamflow and sediment transport using three modeling scenarios: (1) sediment transport simulations for 730 days (Jan. 2001 to Dec. 2002), with existing dam structures, (2) sediment transport simulations based on flows from the 1947 flood at the Kalamazoo River with existing dam structures, and (3) sediment transport simulations based on flows from the 1947 flood at the Kalamazoo River with dams removed. Sediment transport simulations based on the 1947 flood hydrograph provide an estimate of sediment transport rates under maximum flow conditions. These scenarios can be used as an assessment of the sediment load that may erode from the study reach at this flow magnitude during a dam failure. The model was calibrated using suspended sediment as a calibration parameter and root mean squared error (RMSE) as an objective function. Analyses of the calibrated model show a slight bias in the model results at flows higher than 75 m3/s; this means that the model-simulated suspended-sediment transport rates are higher than the observed rates; however, the overall calibrated model results show close agreement between simulated and measured values of suspended sediment. Simulation results show that the Kalamazoo River sediment transport mechanism is in a dynamic equilibrium state. Model results during the 730-day simulations indicate significant sediment erosion from the study reach at flow rates higher than 55 m3/s. Similarly, significant

  3. Landscape Evolution Modelling of naturally dammed rivers

    NARCIS (Netherlands)

    Gorp, van W.; Temme, A.J.A.M.; Baartman, J.E.M.; Schoorl, J.M.

    2014-01-01

    Natural damming of upland river systems, such as landslide or lava damming, occurs worldwide. Many dams fail shortly after their creation, while other dams are long-lived and therefore have a long-term impact on fluvial and landscape evolution. This long-term impact is still poorly understood and

  4. Landscape Evolution Modelling of naturally dammed rivers

    NARCIS (Netherlands)

    van Gorp, Wouter; Temme, Arnaud J. A. M.; Baartman, Jantiene E. M.; Schoorl, Jeroen M.

    2014-01-01

    Natural damming of upland river systems, such as landslide or lava damming, occurs worldwide. Many dams fail shortly after their creation, while other dams are long-lived and therefore have a long-term impact on fluvial and landscape evolution. This long-term impact is still poorly understood and la

  5. 76 FR 12094 - Whitman River Dam, Inc.

    Science.gov (United States)

    2011-03-04

    ... Federal Energy Regulatory Commission Whitman River Dam, Inc. Notice of Application Tendered for Filing.... Applicant: Whitman River Dam, Inc. e. Name of Project: Crocker Dam Hydro Project. f. Location: On the... analysis at this time. n. The Crocker Dam Hydro Project would consist of: (1) The existing...

  6. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

    2007-11-13

    This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat

  7. FORMATION AND FAILURE OF NATURAL DAMS.

    Science.gov (United States)

    Costa, John E.; Schuster, Robert L.

    1988-01-01

    Of the numerous kinds of dams that form by natural processes, dams formed from landslides, glacial ice, and late-neoglacial moraines present the greatest threat to people and property. Landslide dams form a wide range of physiographic settings. The most common types of mass movements that form landslide dams are rock and debris avalanches; rock and soil slumps and slides; and mud, debris, and earth flows. The most common initiation mechanisms for dam-forming landslides are excessive rainfall and snowmelt and earthquakes. Natural dams may cause upstream flooding as the lake rises and downstream flooding as a result of failure of the dam. Although data are few, for the same potential energy at the dam site, downstream flood peaks from the failure of glacier-ice dams are smaller than those from landslide, moraine, and constructed earth-fill and rock-fill dam failures.

  8. Day to day with COPD

    Science.gov (United States)

    COPD - day to day; Chronic obstructive airways disease - day to day; Chronic obstructive lung disease - day to ... Having COPD can sap your energy. These simple changes can make your days easier and preserve your strength. Ask ...

  9. Big Lake Dam Inspection Report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report summarizes an inspection of the Big Lake Dam that was done in September of 1983. The inspection did not reveal any conditions that constitute and...

  10. Turbid releases from Glen Canyon Dam, Arizona, following rainfall-runoff events of September 2013

    Science.gov (United States)

    Wildman, Richard A.; Vernieu, William

    2017-01-01

    Glen Canyon Dam is a large dam on the Colorado River in Arizona. In September 2013, it released turbid water following intense thunderstorms in the surrounding area. Turbidity was >15 nephelometric turbidity units (NTU) for multiple days and >30 NTU at its peak. These unprecedented turbid releases impaired downstream fishing activity and motivated a rapid-response field excursion. At 5 locations upstream from the dam, temperature, specific conductance, dissolved oxygen, chlorophyll a, and turbidity were measured in vertical profiles. Local streamflow and rainfall records were retrieved, and turbidity and specific conductance data in dam releases were evaluated. Profiling was conducted to determine possible sources of turbidity from 3 tributaries nearest the dam, Navajo, Antelope, and Wahweap creeks, which entered Lake Powell as interflows during this study. We discuss 4 key conditions that must have been met for tributaries to influence turbidity of dam releases: tributary flows must have reached the dam, tributary flows must have been laden with sediment, inflow currents must have been near the depth of dam withdrawals, and the settling velocity of particles must have been slow. We isolate 2 key uncertainties that reservoir managers should resolve in future similar studies: the reach of tributary water into the reservoir thalweg and the distribution of particle size of suspended sediment. These uncertainties leave the source of the turbidity ambiguous, although an important role for Wahweap Creek is possible. The unique combination of limnological factors we describe implies that turbid releases at Glen Canyon Dam will continue to be rare.

  11. Conflicts Associated with Dam Removal in Sweden

    Directory of Open Access Journals (Sweden)

    Anna G. C. Lejon

    2009-12-01

    Full Text Available The increasing number of deteriorating old dams that need renovation or have lost their function make dam removal a viable management option. There are at least four major reasons for dam removal: safety, law and policy, economy, and ecology. Here we discuss 17 Swedish dams that were recently considered for removal. Because dam removal usually causes controversy, dam removal initiatives may succeed, fail, or result in a compromise such as a bypass channel for migrating fish. We identify and discuss three major obstructions to dam removal: funding, cultural-historical values, and threatened species. To facilitate dam removal, the reasons for, and the effects of, dam removal must be carefully explained, and the public and stakeholders must be kept informed. In complicated cases in which compromise solutions may be the most feasible outcome, the integration of the knowledge of different stakeholders is crucial. The involvement of diverse stakeholders increases their willingness to find compromises, thus avoiding conflicts and failures.

  12. Evaluation of Lower Umatilla River Channel Modifications Below Three Mile Dam, 1984 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A.; Ward, David L.

    1985-05-01

    This report summarizes results of the first year of a study initiated in September 1984 to evaluate the adequacy of channel modifications made in the lower Umatilla River to improve adult anadromous salmonid passage to Three Mile Dam (RKm 5.6), determine if fish passage or delay problems exist at Three Mile Dam and recommend site specific corrective measures if needed. Movements of steelhead (Salmo gairdneri) were monitored using mark and recapture and radio telemetry techniques. Thirty-four steelhead were marked with T-anchor tags and released in the lower river. Fifteen of those marked were also fitted with radio transmitters. Three radiotagged steelhead migrated through channel modifications to Three Mile Dam. Two of these fish migrated to the dam in less than 26 hours, but held just below the dam for 7 and 10 days before entering the ladders. The third steelhead delayed for 30 days and entered the west ladder within 24 hours of arrival at the dam. Two other radiotagged steelhead moved upstream through some of the channel modifications but did not migrate to the dam. Only one of 19 marked steelhead not fitted with transmitters was recovered at Three Mile Dam. 14 refs., 18 figs., 3 tabs.

  13. In-reservoir behavior, dam passage, and downstream migration of juvenile Chinook salmon and juvenile steelhead from Detroit Reservoir and Dam to Portland, Oregon, February 2013-February 2014

    Science.gov (United States)

    Beeman, John W.; Adams, Noah S.

    2015-01-01

    In the second year of 2 years of study, the movements of juvenile spring Chinook salmon (Oncorhynchus tshawytscha) and juvenile summer steelhead (Oncorhynchus mykiss) through Detroit Reservoir, passing Detroit Dam, and migrating downstream to Portland, Oregon, were studied during a 1-year-long period beginning in February 2013. The primary purpose of the study was to provide empirical data to inform decisions about future alternatives for improving downstream passage of salmonids at Detroit Dam. A secondary purpose was to design and assess the performance of a system to detect juvenile salmonids implanted with acoustic transmitters migrating in the Willamette River. Inferences about fish migration were made from detections of juvenile fish of hatchery origin at least 95 millimeters in fork length surgically implanted with an acoustic transmitter and released during the spring (March–May) and fall (September–November) of 2013. Detection sites were placed throughout the reservoir, near the dam, and at two sites in the North Santiam River and at three sites in the Willamette River culminating at Portland, Oregon. We based most inferences on an analysis period up to the 90th percentile of tag life (68–78 days after release, depending on species and season), although a small number of fish passed after that period as late as April 8, 2014. Chinook salmon migrated from the tributaries of release to the reservoir in greater proportion than steelhead, particularly in the fall. The in-reservoir migration behaviors and dam passage of the two species were similar during the spring study, but during the fall study, few steelhead reached the reservoir and none passed the dam within the analysis period. Migrations in the reservoir were directed and non-random, except in the forebay. Depths of fish within 25 meters of the dam were deeper in the day than at night for Chinook salmon and similar in the day and night for steelhead; steelhead generally were at shallower depths

  14. Experiences from the small historical dams failures during heavy floods

    Science.gov (United States)

    Vaníček, I.; Vaníček, M.; Jirásko, D.; Pecival, T.

    2015-09-01

    Roughly between 400 and 600 years ago many small earth dams were constructed mainly in the south part of the Czech Republic. They were used for fish production and flood protection. To our days roughly one third survived, which means about 25 000 of them. During catastrophic floods in 2002 many of them had some problems but less than 0.3% failed. Experiences gained from the failure evaluation are presented. Firstly from the view of limit states of failures, when limit states of internal erosion and surface erosion played most important role and were the main reason of failures. Secondly, from the view of so called domino effect of failure, when the most important dam on the catchment basin failed and after that the other ones, situated below, had limited chance to survive. The failures are described for catchment basin of the small river Lomnice in south part of the Czech Republic close to the town Blatna. The experiences obtained there led to the evaluation of other catchment basins where domino effect of failure can play also very important role. For the evaluation of potential risk, the numerical modelling was used to study the flood wave propagation below the critical dam, especially at the moment when this wave is reaching the dam situated below the critical one. Finally, the recommendations are specified, not only for individual dams but also for catchment basin, where the risk of domino effect failure is very high.

  15. Damming the rivers of the Amazon basin

    Science.gov (United States)

    Latrubesse, Edgardo M.; Arima, Eugenio Y.; Dunne, Thomas; Park, Edward; Baker, Victor R.; D'Horta, Fernando M.; Wight, Charles; Wittmann, Florian; Zuanon, Jansen; Baker, Paul A.; Ribas, Camila C.; Norgaard, Richard B.; Filizola, Naziano; Ansar, Atif; Flyvbjerg, Bent; Stevaux, Jose C.

    2017-06-01

    More than a hundred hydropower dams have already been built in the Amazon basin and numerous proposals for further dam constructions are under consideration. The accumulated negative environmental effects of existing dams and proposed dams, if constructed, will trigger massive hydrophysical and biotic disturbances that will affect the Amazon basin’s floodplains, estuary and sediment plume. We introduce a Dam Environmental Vulnerability Index to quantify the current and potential impacts of dams in the basin. The scale of foreseeable environmental degradation indicates the need for collective action among nations and states to avoid cumulative, far-reaching impacts. We suggest institutional innovations to assess and avoid the likely impoverishment of Amazon rivers.

  16. Dam risk assistant analysis system design

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    In order to reduce the labor intensity and task difficulty of dam risk analysis and to meet the actual requirement of dam risk analysis,it is necessary to establish a dam risk assistant analysis system.The program structure and the implementation ways of the dam risk assistant analysis system are analyzed,and a procedural framework with "three-tier and multi-database" structure and "level structure" is established.The concept of dam risk assessment system modular development is proposed and the coupled mode of function module and data is improved.Finally,the dam risk assistant analysis system is developed using Delphi visual programming language.

  17. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  18. Dams and Obstructions along Iowa's Canoe Routes

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — This dataset represents obstruction to canoe and boat users of the canoe routes of Iowa. This may represent actual dams, rock dams (natural or man made), large...

  19. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams AGENCY: Tennessee... preferred alternative in its final environmental impact statement (EIS) for the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of availability (NOA) of the...

  20. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  1. Webinar: Stepped chute design for embankment dams

    Science.gov (United States)

    Changing demographics in the vicinity of dams have led to hazard creep in a number of dams worldwide. Many of these dams now have insufficient spillway capacity as a result of these changes in hazard classification from low to significant or high hazard. Stepped chutes applied to the embankment da...

  2. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  3. The formation and failure of natural dams

    Science.gov (United States)

    Costa, J.E.; Schuster, R.L.

    1987-01-01

    Of the numerous kinds of dams that form by natural processes, dams formed from landslides, glacial ice, and neoglacial moraines present the greatest threat to people and property. The most common types of mass movements that form landslide dams are rock and debris avalanches, rock and soil slumps and slides, and mud, debris, and earth flows. The most common initiation mechanisms for dam-forming landslides are excessive rainfall and snowmelt and earthquakes. Landslide dams can be classified into six categories based on their relation with the valley floor. Type I dams (11%) of the 81 landslide dams around the world that were classifed do not reach from one valley side to the other. Type II dams (44%) span the entire valley flood, occasionally depositing material high up on opposite valley sides. Type III dams (41%) move considerable distances both upstream and downstream from the landslide failure. Type IV dams (1%) are rare and involve the contemporaneous failure of material from both sides of a valley. Type V dams (1%) are also rare, and are created when a single landslide sends multiple tongues of debris into a valley forming two or more landslide dams in the same surfaces, that extend under the stream or valley and emerge on the opposite valley side. Many landslide dams fail shortly after formation. Overtopping is by far the most common cause of failure. Glacial ice dams can produce at least nine kinds of ice-dammed lakes. The most dangerous are lakes formed in main valleys dammed by tributary glaciers. Failure can occur by erosion of a drainage tunnel under or through the ice dam or by a channel over the ice dam. Cold polar ice dams generally drain supraglacially or marginally by downmelting of an outlet channel. Warmer temperate-ice dams tend to fail by sudden englacial or subglacial breaching and drainage. Late neoglacial moraine-dammed lakes are located in steep mountain areas affected by the advances and retreats of valley glaciers in the last several

  4. Separating the mink dam from the litter at 7 or 8 weeks after delivery

    DEFF Research Database (Denmark)

    Malmkvist, Jens; Palme, Rupert; Larsen, Torben

    2015-01-01

    around the time of separation. Therefore, we investigated the effects of separating the dam from the litter, using brown first-parity dams (N=374) randomly assigned within each date of delivery to two treatment groups: The dam was taken away from the litter either at day 49 ±1 (7w, N=185) or at day 56 ±1......The optimal timing of separating the mink dam from the litter is suggested to be a balance between the partly conflicting needs of the mother and the kits. Early removal of the dam or partial removal of the litter may protect the dam against exhaustion. Little is known about the maternal motivation...... groups had an equal litter size at the time of separation (age 7w: 5.5 ±0.17; 8w: 5.5 ±0.17 kits; range 1-11; P=0.76). Likewise, there was no significant difference in dam body weight (7w: 1420 ±15.0 g, 8w: 1404 ±14.7 g; range 930-1680 g, P=0.43). However, the litter size negatively influenced both...

  5. May Day

    Institute of Scientific and Technical Information of China (English)

    王芳

    2009-01-01

    For Teacher: May Day occurs in May 1 and refers to any of several public holidays.In many countries, May Day is synonymous(同义词的)with International Workers' Day, or Labor Day, which celebrates the social and economic achievements(成就)of the labor movement.

  6. May Day

    Institute of Scientific and Technical Information of China (English)

    王芳

    2009-01-01

    For Teachers: May Day occurs on May 1 and refers to any of several public holidays. In many coun- tries, May Day is synonymous (同义词的) with International Workers' Day, or Labor Day, which celebrates the social and economic achievements (成就) of the labor movement. As a day of celebration, the holiday has an- cient origins (起源), and it can relate to many customs that have survived into modem times.

  7. Research on shape optimization of CSG dams

    Directory of Open Access Journals (Sweden)

    Xin CAI

    2011-12-01

    Full Text Available The multi-objective optimization method was used for shape optimization of cement sand and gravel (CSG dams in this study. The economic efficiency, the sensitivities of maximum horizontal displacement and maximum settlement of the dam to water level changes, the overall stability, and the overall strength security were taken into account during the optimization process. Three weight coefficient selection schemes were adopted to conduct shape optimization of a dam, and the case studies lead to the conclusion that both the upstream and downstream dam slope ratios for the optimal cross-section equal 1:0.7, which is consistent with the empirically observed range of 1:0.6 to 1:0.8 for the upstream and downstream dam slope ratios of CSG dams. Therefore, the present study is of certain reference value for designing CSG dams.

  8. Future directions of dam safety in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Verzeni, Gerard [Hydro Quebec, QC, (Canada)

    2010-07-01

    Gerard Verzeni, former director of the dam safety & environment at Hydro-Quebec introduced the future directions of dam safety in Canada. New and numerous challenges are emerging for the dam safety community. Measurable effects of climate changes illustrate that hydraulic forecasts would change drastically. Loads with times and amplitudes which are different from the actual knowledge will apply on dams. The development of new types of dams using recent technologies raises several issues, for example the longevity of such installations. The installations are becoming old and soon will require complete renovation and update for regulation and standards compliance. Concrete dams already need efforts and investment to maintain then in a safe state. Various factors will influence these challenges such as human resources in the dam safe community. In these conditions, it is important that organizations like CDA play an important role in providing support and reference and in being a driver for the whole industry.

  9. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  10. Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam safety management into the next millenium; 6 - rehabilitation techniques: the unconventional application of conventional materials; nondestructive testing technology to characterize concrete dam/bedrock interface; method and instrument for detecting crack in concrete; and grouting of the cracks in the Arch 5-6 - Daniel Johnson Dam; and 7 - case studies: rehabilitation of an 80 year old Ambursen type dam; and debris booms for the protection of spillways.

  11. Summary of the Richard B. Russell Concrete Dam Vibration Study.

    Science.gov (United States)

    1988-02-01

    REPORT (Year. Month,. Day) 15 PAGE COUN T - ., tROM _____To __ Februarv 1988 6 5K51EN’S" 0-A-ON Aabsle f--m National Technical Information Service, 5285...SL, and was edited by Ms. Lee T. Byrne of the Information Products Division, Information Technology Laboratory, WES. COL Dwayne G. Lee, CE, is the...the dam. 50. Measurements from both tests at the relative joint motion arrays indicated relative motions between monoliths. The nonlinear behavoir of

  12. Brazil's Amazonian dams: Ecological and socioeconomic impacts

    Science.gov (United States)

    Fearnside, P. M.

    2016-12-01

    Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be expected to increase as Amazonian hydroelectric dams far from consumer centers come on line. Brazil has tremendous wind and solar potential, but these do not have the same priority as dams. At the root of many questionable policies is a decision-making process in need of reform.

  13. Triclosan exposure reduces thyroxine levels in pregnant and lactating rat dams and in directly exposed offspring

    DEFF Research Database (Denmark)

    Petersen, Marta Axelstad; Boberg, Julie; Vinggaard, Anne Marie

    2013-01-01

    Thyroid disrupting chemicals can potentially disrupt brain development. Two studies investigating the effect of the antibacterial compound triclosan on thyroxine (T4) levels in rats are reported. In the first, Wistar rat dams were gavaged with 75, 150 or 300 mg triclosan/kg bw/day throughout...... gestation and lactation. Total T4 serum levels were measured in dams and offspring, and all doses of triclosan significantly lowered T4 in dams, but no significant effects on T4 levels were seen in the offspring at the end of the lactation period. Since this lack of effect could be due to minimal exposure...... through maternal milk, a second study using direct per oral pup exposure from postnatal day 3–16 to 50 or 150 mg triclosan/kg bw/day was performed. This exposure pointed to significant T4 reductions in 16 day old offspring in both dose groups. These results corroborate previous studies showing...

  14. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  15. Dam safety review, classification of dams for the Novia Scotia Power Inc. Black River hydroelectric system

    Energy Technology Data Exchange (ETDEWEB)

    Alderman, Aaron; Small, Andy [AMEC Earth and environmental, Fredericton, (Canada); O' Neil, Ellis [Nova Scotia Power Inc., Halifax, (Canada)

    2010-07-01

    In 2009, AMEC was retained by Nova Scotia Power Inc. (NSPI) to conduct a dam safety review of the dams that are part of the Black River Hydroelectric System. This paper presented the results of this dam classification exercise which was carried out for the Bear River hydroelectric system in Nova Scotia, based on the 2007 Canadian Dam Association (CDA) dam safety guidelines. Flood mapping and dam-break analysis were performed for events ranging from the 1:100 year to PMF flood events, including cascading events. These results were used to draw up a classification of the dams. Associated design criteria were then developed. Following the assessment of the dam sites, conclusions and recommendations were discussed. The recommendations were presented in terms of regular maintenance items and reconstruction items, which are now used by NSPI to determine the party responsible for undertaking the recommendation and for evaluation of the maintenance and reconstruction schedules.

  16. Dam Inventory, dams, Published in 2009, 1:24000 (1in=2000ft) scale, Washington County.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Dam Inventory dataset, published at 1:24000 (1in=2000ft) scale, was produced all or in part from Other information as of 2009. It is described as 'dams'. Data...

  17. 78 FR 76596 - Proposed Levels of Service at Locks and Dams on the J Bennett Johnston Waterway (Red River)

    Science.gov (United States)

    2013-12-18

    ... Johnston Waterway (Red River) AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD. ACTION... Dam on the J Bennett Johnston Waterway will remain at the current schedule of 24 hours per day, 7...

  18. Yearling mink dams fed restricted in early lactation have less mammary gland tissue six weeks after birth

    DEFF Research Database (Denmark)

    Møller, Steen Henrik; Pinkalski, Mariann Nakano

    2015-01-01

    The optimal timing of separating the mink dam from the litter is suggested to be a balance between the partly conflicting needs of the mother and the kits. Early removal of the dam or partial removal of the litter may protect the dam against exhaustion. Little is known about the maternal motivation...... around the time of separation. Therefore, we investigated the effects of separating the dam from the litter, using brown first-parity dams (N=374) randomly assigned within each date of delivery to two treatment groups: The dam was taken away from the litter either at day 49 ±1 (7w, N=185) or at day 56 ±1...... (8w, N=189) after birth. The aim was to investigate whether the dams had a different motivation to take care of the litter after 7 and 8 weeks, estimated by non-invasive determination of cortisol (FCM: Faecal Corticsol Metabolites) and dam calls the first week after separation. The two treatment...

  19. First Assessment of Itaipu Dam Ensemble Inflow Forecasting System

    Science.gov (United States)

    Mainardi Fan, Fernando; Machado Vieira Lisboa, Auder; Gomes Villa Trinidad, Giovanni; Rógenes Monteiro Pontes, Paulo; Collischonn, Walter; Tucci, Carlos; Costa Buarque, Diogo

    2017-04-01

    Inflow forecasting for Hydropower Plants (HPP) Dams is one of the prominent uses for hydrological forecasts. A very important HPP in terms of energy generation for South America is the Itaipu Dam, located in the Paraná River, between Brazil and Paraguay countries, with a drainage area of 820.000km2. In this work, we present the development of an ensemble forecasting system for Itaipu, operational since November 2015. The system is based in the MGB-IPH hydrological model, includes hydrodynamics simulations of the main river, and is run every day morning forced by seven different rainfall forecasts: (i) CPTEC-ETA 15km; (ii) CPTEC-BRAMS 5km; (iii) SIMEPAR WRF Ferrier; (iv) SIMEPAR WRF Lin; (v) SIMEPAR WRF Morrison; (vi) SIMEPAR WRF WDM6; (vii) SIMEPAR MEDIAN. The last one (vii) corresponds to the median value of SIMEPAR WRF model versions (iii to vi) rainfall forecasts. Besides the developed system, the "traditional" method for inflow forecasting generation for the Itaipu Dam is also run every day. This traditional method consists in the approximation of the future inflow based on the discharge tendency of upstream telemetric gauges. Nowadays, after all the forecasts are run, the hydrology team of Itaipu develop a consensus forecast, based on all obtained results, which is the one used for the Itaipu HPP Dam operation. After one year of operation a first evaluation of the Ensemble Forecasting System was conducted. Results show that the system performs satisfactory for rising flows up to five days lead time. However, some false alarms were also issued by most ensemble members in some cases. And not in all cases the system performed better than the traditional method, especially during hydrograph recessions. In terms of meteorological forecasts, some members usage are being discontinued. In terms of the hydrodynamics representation, it seems that a better information of rivers cross section could improve hydrographs recession curves forecasts. Those opportunities for

  20. Measurement of Dam Deformations: Case Study of Obruk Dam (Turkey)

    Science.gov (United States)

    Gulal, V. Engin; Alkan, R. Metin; Alkan, M. Nurullah; İlci, Veli; Ozulu, I. Murat; Tombus, F. Engin; Kose, Zafer; Aladogan, Kayhan; Sahin, Murat; Yavasoglu, Hakan; Oku, Guldane

    2016-04-01

    In the literature, there is information regarding the first deformation and displacement measurements in dams that were conducted in 1920s Switzerland. Todays, deformation measurements in the dams have gained very different functions with improvements in both measurement equipment and evaluation of measurements. Deformation measurements and analysis are among the main topics studied by scientists who take interest in the engineering measurement sciences. The Working group of Deformation Measurements and Analysis, which was established under the International Federation of Surveyors (FIG), carries out its studies and activities with regard to this subject. At the end of the 1970s, the subject of the determination of fixed points in the deformation monitoring network was one of the main subjects extensively studied. Many theories arose from this inquiry, as different institutes came to differing conclusions. In 1978, a special commission with representatives of universities has been established within the FIG 6.1 working group; this commission worked on the issue of determining a general approach to geometric deformation analysis. The results gleaned from the commission were discussed at symposiums organized by the FIG. In accordance with these studies, scientists interested in the subject have begun to work on models that investigate cause and effect relations between the effects that cause deformation and deformation. As of the scientist who interest with the issue focused on different deformation methods, another special commission was established within the FIG engineering measurements commission in order to classify deformation models and study terminology. After studying this material for a long time, the official commission report was published in 2001. In this prepared report, studies have been carried out by considering the FIG Engineering Surveying Commission's report entitled, 'MODELS AND TERMINOLOGY FOR THE ANALYSIS OF GEODETIC MONITORING OBSERVATIONS

  1. Study on dynamic anti-sliding stability of a high gravity dam considering complex dam foundation

    OpenAIRE

    Deng-hong CHEN; Cheng-bin DU

    2011-01-01

    There existed some limitations when analyzing the anti-sliding seismic stability of dam-foundation system by traditional pseudo-static method and response spectrum method. The dynamic strength reduction method was used to study on the deep anti-sliding stability of a high gravity dam considering complex dam foundation under strong earthquake-induced ground action. The static analysis was firstly carried out by reducing the shear strength parameters of the dam foundation’s rock mass with equal...

  2. 78 FR 60271 - Hollow Dam Power Company; Ampersand Hollow Dam Hydro, LLC; Notice of Application for Transfer of...

    Science.gov (United States)

    2013-10-01

    ... Federal Energy Regulatory Commission Hollow Dam Power Company; Ampersand Hollow Dam Hydro, LLC; Notice of..., Hollow Dam Power Company (transferor) and Ampersand Hollow Dam Hydro, LLC (transferee) filed an application for transfer of license for the Hollow Dam Project, FERC No. 6972, located on the West Branch...

  3. Numerical modelling for stability of tailings dams

    OpenAIRE

    Auchar, Muhammad; Mattsson, Hans; Knutsson, Sven

    2013-01-01

    A tailings dam is a large embankment structure that is constructed to store the waste from the mining industry. Stability problems may occur in a tailings dam due to factors such as quick rate of raising, internal erosion and liquefaction. The failure of a tailings dam may cause loss of human life and environmental degradation. Tailings Dams must not only be stable during the time the tailings storage facility is in operation, but also long time after the mine is closed. In Sweden, the licens...

  4. Debris Flow Dam Formation in Southeast Tibet

    Institute of Scientific and Technical Information of China (English)

    CHENG Zunlan; WU Jishan; GENG Xueyong

    2005-01-01

    Glaciers with their deposits abound in the alpine areas of Southeast Tibet. Large debris flows occur frequently from these deposits and form dams that block streams. In this paper, 3 events of large debris flows reported in Peilong Valley located in Southeast Tibet, and which resulted 2 blocking dams resulted, are discussed in details, focusing on the major factors controlling dam formation. The results shows that the first surge group caused by snow and ice avalanches, ice-lake breaks, and large-scale landslides, with a high peak discharge and high velocity, and an abundance of boulders, are most likely to form blocking dams.

  5. Comprehensive evaluation methods for dam service status

    Institute of Scientific and Technical Information of China (English)

    WU ZhongRu; XU Bo; GU ChongShi; LI ZhanChao

    2012-01-01

    More than 87000 dams have been built in China,and about one third of them are risky projects.A number of high and ultra-high dams are being constructed in China's western region.The current dam construction practice tends to focus on socio-economic benefits and neglect the environment and ecology.Furthermore,periodic examinations are intended to ensure the structural safety of dams.This paper proposes a general evaluation principle for dam service.This principle stipulates that dam projects should have maximum socio-economic benefits and minimum negative effects on the environment and ecology.To satisfy the general principle of mutual harmony,socio-economic benefits,dam safety,environment,and ecology are analyzed,and the evaluation methods for dam service status are discussed.Then,a fusion algorithm of interlayer assessment is proposed on the basis of evidence theory and the fuzzy comprehensive analysis method.Finally,a comprehensive evaluation model is established.Example analysis shows that the proposed theories and methods can fulfill scientific assessment of the service status of dams.

  6. CEMI Days

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-07-01

    CEMI Days are an important channel of engagement between DOE and the manufacturing industry to identify challenges and opportunities for increasing U.S. manufacturing competitiveness. CEMI Days that are held at manufacturing companies’ facilities can include tours of R&D operations or other points of interest determined by the host company.

  7. Dinosaur Day!

    Science.gov (United States)

    Nakamura, Sandra; Baptiste, H. Prentice

    2006-01-01

    In this article, the authors describe how they capitalized on their first-grade students' love of dinosaurs by hosting a fun-filled Dinosaur Day in their classroom. On Dinosaur Day, students rotated through four dinosaur-related learning stations that integrated science content with art, language arts, math, and history in a fun and time-efficient…

  8. Safety Aspects of Sustainable Storage Dams and Earthquake Safety of Existing Dams

    Directory of Open Access Journals (Sweden)

    Martin Wieland

    2016-09-01

    Full Text Available The basic element in any sustainable dam project is safety, which includes the following safety elements: ① structural safety, ② dam safety monitoring, ③ operational safety and maintenance, and ④ emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. However, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be carried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that dam safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.

  9. Mechanical effects of excavation rebound of arch dam bedrock and better concreting time of dam body

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    In high ground stress zone, rebound deformation of excavation of arch dam bedrock has a significant impact on the structural behavior, design and construction of arch dam. Based on the analysis of mechanical effects of excavation rebound, with both stress and deformation as two constraint conditions and deformation modulus as a controlling condition, the method to determine a better concreting time of dam body was put forward. All of these play an important guiding role in the excavation of dam bedrock and the construction of dam body.

  10. McNary Dam, Ice Harbor Dam, and Lower Monumental Dam Smolt Monitoring Program; 1996 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hillson, Todd; Lind, Sharon; Price, William (Washington Department of Fish and Wildlife, Olympia, WA)

    1997-07-01

    The Washington Department of Fish & Wildlife (WDFW) assumed responsibility for the Smolt Monitoring Program at McNary Dam on the Columbia River in 1990 and at the new juvenile collection facility at Lower Monumental Dam on the Snake River in 1993. In 1996, Smolt Monitoring Program activities also began at the new juvenile collection facility located at Ice Harbor Dam. This report summarizes the 1996 Smolt Monitoring work at all three sites. The work at Ice Harbor consisted of Gas Bubble Trauma (GBT) monitoring only. In general, the 1996 passage season at both the McNary and Lower Monumental sites can be characterized by reduced passage of juveniles through the collection systems due to elevated river flows and spill, and low (<1%) overall facility mortality rates most likely resulting from cooler water temperatures. In accordance with the National Marine Fisheries Service recommendations (NMFS, 1995) all spring migrants were bypassed at McNary Dam in 1996. Mechanical problems within the McNary collection system resulted in collection and sampling activities being delayed until April 18 at this site, while sampling and collection began on the scheduled starting date of April 1 at Lower Monumental Dam. Monitoring operations were conducted through December 14 at McNary Dam and through October 28 at Lower Monumental Dam. An ongoing transportation evaluation summer migrant marking program was conducted at McNary Dam in 1996 by the NMFS. This necessitated the sampling of 394,211 additional fish beyond the recommended sampling guidelines. All total, 509,237 and 31,219 juvenile salmonids were anesthetized and individually counted, examined for scale loss, injuries, and brands by WDFW Smolt Monitoring personnel in 1996 at McNary Dam and Lower Monumental Dam, respectively.

  11. Adaptability to geological faulted foundation of Hardfill dam

    Institute of Scientific and Technical Information of China (English)

    Kun XIONG; Yunlong HE; Yunfeng PENG

    2008-01-01

    Hardfill dam is a new type of dam which has the advantages of low stress level and even stress distri-bution in a dam body, resulting in low demands to foun-dations. Based on 2D linear elastic and elasto-plastic calculations of gravity dam and Hardfill dam using finite element method (FEM), the stress distribution in a dam body and anti-sliding stabilization is analyzed on the geo-logical faulted foundations with weak weathered rock and soft interlayers. It is concluded that Hardfill dams have better adaptability to geological faulted foundations than gravity dams and is more secure and economically sound.

  12. Vulnerability of aged concrete gravity dams

    Energy Technology Data Exchange (ETDEWEB)

    Gogoi, I. [Assam Engineering Institute, Guwahati (India). Dept. of Civil Engineering; Maity, D. [Indian Institute of Technology, Guwahati (India). Dept. of Civil Engineering

    2004-07-01

    This paper presented an analysis procedure to predict the effects of aging on the behavior of concrete gravity dams. A time dependent isotropic damage index was determined, presenting the performance of the dam with increasing age. Results revealed that the degradation process is dependent on the design life of the structure. The influence of damage along the dam height was greater than damage observed along its width. In order to consider the time dependent degradation of concrete owing to environmental factors and mechanical loading, an algorithm was presented in order to forecast the behavior of existing dams and to assess the necessity of retrofitting or decommissioning. It was concluded that dam behavior during seismic excitation is influenced by the effects of both the dam reservoir system and initial earthquake damage. With increasing age, dam displacement increases, but hydrodynamic pressures and stresses exerted by reservoirs decrease. It was recommended that more accurate behavior could be determined if further research into the coupled effect of foundation-dam-reservoir interaction with material non-linearity was considered. 15 refs.,15 figs.

  13. Effects of Hypergravity Exposure on Prolactin Levels in Pre-parturient , Parturient and Lactating Rat Dams

    Science.gov (United States)

    Baer. Lisa A.; Wade, Charles E.; Ronca, April E.; Sun, Sid (Technical Monitor)

    2001-01-01

    We analyzed the effects of 2.0-g, 1.75-g and 1.5-g hypergravity exposure on plasma concentrations of the lactotrophic hormone, prolactin (PRL), in female rats on pre-parturient (Gestation Day 20), parturient (Post-natal day 0) and lactating (P10) days. PRL levels have been found to be reduced in rat dams around the time of birth following exposure to gravitational loads varying from 2.16 to 3.14-g (Megory et. al., Aviation, Space and Environs 1129-1135, 1984). It has also been reported that at these high gravitational loads, neonatal mortality has been extremely high, suggesting a possible interaction between dam PRL concentration and neonatal outcome. We have previously reported no significant differences in PRL levels of parturient (PO) and lactating (P6 & P 15) dams when exposed to 1.5-g hypergravity, but did observe a slight elevation of PRL on PO and P 15, with a decrease on P6. In the present study, time-bred pregnant dams were exposed to either continuous 2.0-g, 1.75-g or 1.5-g centrifugation, beginning on Gestational day (G) 11 of the rats' 22-day pregnancy. We observed no significant differences in PRL concentrations between SC and any of the HG conditions. On G20 and PO, PRL concentrations of the 2.0-g and 1.5-g groups were slightly elevated as compared to SC. Similar to what we previously reported. PRL secretion was elevated in both HG and SC conditions on the day of birth relative to later during lactation, but on P10 it appeared to be reduced in HG relative to SC dams. These findings suggests that hypergravity slightly elevates plasma concentration of PRL in pre-parturient and lactating rat dams, with effects most pronounced during the periparturitional period and in a direction opposite to that observed following microgravity exposure.

  14. Growth traits and composition of two- and three-way-cross intact male progeny of Bos taurus and Bos indicus X Bos taurus dams.

    Science.gov (United States)

    Van Ornum, K M; Bailey, C M; Ringkob, T P; Koh, Y O

    1987-07-01

    Feedlot traits, carcass traits and distribution of commercial cuts of crossbred intact male progeny (n = 556) from young and mature Hereford, Red Poll, Hereford X Red Poll, Red Poll X Hereford, Angus X Hereford, Angus X Charolais, Brahman X Hereford and Brahman X Angus dams were evaluated. First-calf heifers were bred to Red Angus bulls; Santa Gertrudis sires were used for each cow's second and third breeding seasons. Calves from these young dams were slaughtered at 13 mo. Calves of mature dams were all sired by Limousin bulls and slaughtered at 12 mo. Dam breed was a major source of variation in most bull traits. Progeny of Brahman-cross dams were inferior (P less than .01) in daily gain, final weight, carcass weight and in edible cuts/day of age compared with progeny from Bos taurus dams. Intact male progeny of Angus X Charolais dams ranked highest in longissimus area, cutability, and edible cuts/day of age. The range of dam breed means in percentage of steak, roast, bone-in cuts (chuck short ribs and back ribs), short plate and thin cuts, and lean trim was just over 1%. Greater variation among dam breeds existed in fat measurements. Analyses in which Hereford-Red Poll diallel data for young dams and mature dams were combined showed positive maternal heterosis for dressing percentage (P less than .05), carcass weight (P less than .05), carcass weight/day of age (P less than .05), estimated carcass fat (P less than .05), fat thickness (P less than .01) and marbling score (P less than .01). Reciprocal effects were inconsequential. Results illustrate the importance of dam breed-type effects in formulating breeding strategies for commercial beef herds.

  15. Upgrading of Boundary Dam spillway

    Energy Technology Data Exchange (ETDEWEB)

    McPhail, Gordon; MacMillan, Dave; Smith, Bert [KGS Group, Winnipeg, (Canada); Lacelle, Justin [SaskPower, Regina, (Canada)

    2010-07-01

    An initial dam safety review was performed in 2005 and identified a number of concerns; the most critical were insufficient spillway capacity and deficiencies in the condition of the existing spillways. This paper described the challenges faced by the upgrading operation on the 50 year old Boundary Dam spillway started in 2008. SaskPower retained the KGS Group to increase the design spillway capacity to 1200 m3/s and remedy observed defects. The construction project involved maintaining the reservoir at full supply level while the 20m long spillway chute and stilling basin below were completely replaced. The difficulties came from the need to complete each year's construction such that the spillway could potentially pass spring flood flows. This paper showed that the upgrade measures selected for implementation were developed through close dialogue between the owner and the designer, with valuable input provided by a panel of external experts as well as from contractors participating in the design process.

  16. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Gregory A. Thomas

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  17. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  18. MAY DAY

    Institute of Scientific and Technical Information of China (English)

    李佳

    2009-01-01

    @@ May 1 is Intemational Labour Day.It is a great holiday for the working class.On this day working people all over the world demonstrate(显示)their power and solidarity(团结).It has its origins(起因,起源)in the struggle for shorter working hours.In 1884,eight Labour Unions of the United States and Canada held a convention(集会)in Chicago(芝加哥).Here it was decided to wage(开展)a united struggle to win the eight-hour day.A resolution(决议) was adopted (通过)fixing May1,1886,for a great nationwide(全国性的)demonstration(示威).

  19. Feeding Activity, Rate of Consumption, Daily Ration and Prey Selection of Major Predators in John Day Reservoir, 1986 : Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Poe, Thomas P.; United States. Bonneville Power Administration; U.S. Fish and Wildlife Service; National Fishery Research Center (U.S.)

    1987-02-01

    This report summarizes activities in 1986 to determine the significance of predation on juvenile salmonids in John Day Reservoir. Salmonids were the single most important food item (by weight) for northern squawfish (Ptychocheilus oregonensis) at McNary tailrace during all sampling periods and at John Day forebay during July. Salmonids accounted for 23.7% of the diet of walleye (Stizostedion vitreum vitreum) in July 1986, which was higher than in previous years (although the sample size examined was low). Salmonids contributed little to smallmouth bass (Micropterus dolomieui) diet but comprised about 25% of the diet of channel catfish (Ictalurus punctatus). Composition of prey taxa in beach seine catches in July 1986 was similar to previous years with chinook salmon (Oncorhynchus tschawytscha), largescale sucker (Catostomus macrocheilus), and sand roller (Percopsis transmontana) dominating the catch.

  20. Do we need construct more dams?

    Science.gov (United States)

    Chen, J.; Shi, H.

    2013-12-01

    This paper reviews global dam development in association with the growths of global population, economy, and energy consumption in the past several decades, and also evaluates contributions of dam development to future world sustainable development. Eventually, this paper answers whether we need more dams in the future or not. The world population has rapidly increased from 1.6 billion in 1900, 2.5 billion in 1950, 6.1 billion in 2000, to 7.0 billion in 2011, and is projected to reach 9.5 billion in 2050; similarly, the world economy has dramatically expanded. To maintain socioeconomic development, the consumption of water, food and energy has increased rapidly as well. However, the total volume of available water resource over the world is limited, the food production largely depends on water supply, and the main energy sources are still oil, coal and gas at present, which are regarded as non-renewable resources. Accordingly, it is expected that we will face serious problems to deal with the challenges of water crisis, food security and energy shortage in the near future. In order to enhance the capability of regulating water resource, a great number of global dams (and related reservoirs) have been constructed in the last one hundred years; currently, almost all large rivers over the world have been regulated by dams. The reservoirs can supply sufficient water for irrigated land to ensure food production, and the associated hydropower stations can generate electricity. This article collects the dam data from the ICOLD (International Commission on Large Dams) and GRanD (Global Reservoir and Dam) databases, and some socioeconomic data, including population, economy, and consumptions of water, food and energy over the world. Analysis of these data reveals that global dam development has a great impact on the world sustainable development. Further, it is concluded that we need further dam development to maintain our future development.

  1. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1989-1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1990-09-01

    We report on our progress from April 1989 through March 1990 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from McNary Dam, to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam, to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams, and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights from this work is also included. 47 refs., 33 figs., 66 tabs.

  2. Seismic failure modes and seismic safety of Hardfill dam

    Institute of Scientific and Technical Information of China (English)

    Kun XIONG; Yong-hong WENG; Yun-long HE

    2013-01-01

    Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  3. Analysis on coherence changes of dam surface in TerraSAR Strip mode interferograms

    Science.gov (United States)

    Li, Tao; Gong, Chunlong; Xia, Min; Jin, Zonghuang

    2011-10-01

    The high resolution images of TerraSAR has made it able to reflect the detail characters of large-scale manmade structures, so monitoring local deformation of large-sized buildings comes to be available. Former research had shown that InSAR phase of the dam surface was stable and consecutive. This paper aimed to make a further proof of the viability of monitoring dam's deformation using 3-meter-resolution strip mode images of TerraSAR. So we made a time series analysis of dam surface's coherence for the next step. Our dataset had eleven images covering three medium size basins of Shenzhen. Coherence of different features in the basin area including dams was extracted to make a comparative analysis. Two different combination methods were designed to create interferometric pairs to find the influence of time baseline and perpendicular baseline to coherence of different cultures. In our research, it was find out that coherence of dam surface was mainly influenced by time baseline. In short time baseline pairs (eleven days), coherence of dam surface was about 0.2 higher than vegetation slope in average. DInSAR process was suitable for short time baseline interferometric pairs, other methods such as PS will be needed for long time baseline interferometric pairs.

  4. Seismic Analysis of Morrow Point Dam

    Energy Technology Data Exchange (ETDEWEB)

    Noble, C R

    2002-04-01

    The main objective of this study is to perform nonlinear dynamic earthquake time history analyses on Morrow Point Dam, which is located 263 km southwest of Denver, Colorado. This project poses many significant technical challenges, one of which is to model the entire Morrow Point Dam/Foundation Rock/Reservoir system which includes accurate geology topography. In addition, the computational model must be initialized to represent the existing dead loads on the structure and the stress field caused by the dead loads. To achieve the correct dead load stress field due to gravity and hydrostatic load, the computer model must account for the manner in which the dams were constructed. Construction of a dam finite element model with the correct as-built geometry of the dam structure and simply ''turning on'' gravity in the computer model will generally lead to an incorrect initial stress field in the structure. The sequence of segmented lifts typical of dam construction has a significant impact on the static stress fields induced in the dam. In addition, the dam model must also account for the interaction between the adjacent dam segments across the dam contraction joints. As a result of these challenges, it was determined that a significant amount of code development was required in order to accurately simulate the motion of the dam structure. Modifications to the existing slide surfaces are needed to allow for appropriate modeling of the shear keys across the contraction joints. Furthermore, a model for hydrodynamic interaction was also implemented into NIKE3D and DYNA3D for fluid representation in the 3D dam system finite element model. Finally, the modeling of the 3D dam system results in a very large computational model, which makes it difficult to perform a static initialization using an implicit code. Traditionally, for these large models, the model has been initialized over a long time scale using an explicit code. However, recent advancements

  5. Hydrological Analysis for Inflow Forecasting into Temengor Dam

    Science.gov (United States)

    Najid, MI; Sidek, LM; Hidayah, B.; Roseli, ZA

    2016-03-01

    These days, natural disaster such as flood is the main concern for hydrologists. One of solutions in understanding the reason of flood is by prediction of the event sooner than normal occurrence. One of the criteria is lead time or travel time that is important in the study of fresh waters and flood events. Therefore, estimation of lead or travel time for flood event can be beneficial primary information. The objective of this study is to estimate the lead time or travel time for outlet of Temengor dam in Malaysia. Tenaga Nasional Berhad (TNB) Sungai Perak dam operation has the main contribution on decision support for early water released and flood warning to authorities and locals resident for in the down streams area. For this study, hydrological analysis carried out will help to determine which years that give more rainfall contribution into the reservoir. Rainfall contribution of reservoir help to understanding rainfall distribution and peak discharge on that period. It also help for calibration of forecasting model system for better accuracy of flood hydrograph. There may be various methods to determine the rainfall contribution of catchment. The result has shown that, the rainfall contribution for Temengor catchment, is more on November in each year which is the monsoon season in Malaysia. TNB dam operational decision support systems can prepare and be more aware at this time for flood control and flood mitigation.

  6. Thanksgiving Day

    Institute of Scientific and Technical Information of China (English)

    孙刚

    2004-01-01

    Fourth Thursday in November almost every culture in the world has held celebrations of thanks for a plentiful harvest.The American thanksgiving in the early days of the American colonies almost four hundred years ago.On that date in 1621,the European settlers in Plymouth,Massachusetts,gave their thanks to god for letting them survive their first year in the new world.They celebrated by having a large feast or dinner.

  7. The effect of exposure to hypergravity on pregnant rat dams, pregnancy outcome and early neonatal development

    Science.gov (United States)

    Ladd, B.; Nguon, K.; Sajdel-Sulkowska, E. M.

    2006-01-01

    We previously reported that hypergravity exposure affects food intake and mass gain during pregnancy. In the present study, we explored the hypothesis that changes in maternal body mass in hypergravity-exposed pregnant rat dams affect pregnancy outcome and early offspring development. Furthermore, we hypothesized that the changes observed at 1.5G will be magnified at higher gravity and by exposure during critical developmental periods. To test this hypothesis, we compared maternal body mass gain, food consumption, birth outcome and early offspring development between Sprague Dawley rat dams exposed to graded (1.5 1.75G) chronic hypergravity (HG) or rotation (rotational control, RC) on a 24-ft centrifuge for 22.5 h starting on gestational day (G) 10 with dams housed under identical conditions but not exposed to hypergravity (SC). We also compared maternal body mass, food consumption, birth outcome and early offspring development between rat dams exposed to 1.65G during different stages of pregnancy and nursing. Exposure to hypergravity resulted in transient loss in body mass and prolonged decrease in food consumption in HG dams, but the changes observed at 1.5G were not magnified at 1.65G or 1.75G. On the other hand RC dams gained more mass and consumed more food than SC dams. Exposure to hypergravity also affected pregnancy outcome as evidenced by decreased litter size, lowered neonatal mass at birth, and higher neonatal mortality; pregnancy outcome was not affected in RC dams. Neonatal changes evidenced by impaired righting response observed at 1.5G was magnified at higher gravity and was dependent on the period of hypergravity exposure. On the other hand, righting response was improved in RC neonates. Hypergravity exposure during early postpartum affected the food consumption of nursing mothers and affected early survival of their offspring. The changes observed in dams and neonates appear to be due to hypergravity exposure since animals exposed to the rotation

  8. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  9. Nonlinear Seismic Analysis of Morrow Point Dam

    Energy Technology Data Exchange (ETDEWEB)

    Noble, C R; Nuss, L K

    2004-02-20

    This research and development project was sponsored by the United States Bureau of Reclamation (USBR), who are best known for the dams, power plants, and canals it constructed in the 17 western states. The mission statement of the USBR's Dam Safety Office, located in Denver, Colorado, is ''to ensure Reclamation dams do not present unacceptable risk to people, property, and the environment.'' The Dam Safety Office does this by quickly identifying the dams which pose an increased threat to the public, and quickly completing the related analyses in order to make decisions that will safeguard the public and associated resources. The research study described in this report constitutes one element of USBR's research and development work to advance their computational and analysis capabilities for studying the response of dams to strong earthquake motions. This project focused on the seismic response of Morrow Point Dam, which is located 263 km southwest of Denver, Colorado.

  10. Ririe Dam Release Test Assessment

    Science.gov (United States)

    2013-06-01

    72 Lyme Road Hanover, NH 03755-1290 Stephen Hall and Jeremy Giovando US Army Engineer District, Walla Walla 201 North Third Avenue Walla Walla...11/2013 at 0330 2/12/2013 at 1410 10120114 95th St. (1) 10120115 55th St. (2) 2/11/2013 at 1010 2/12/2013 at 2120 10120111 55th St. (1) 9737377...Ririe Dam 2/10/2013 at 1440 0 hr 64,700 N 95th E 2/12/2013 at 1410 47 hr 30 min 0.32 0.32 33,020 55th St. Bridge 2/12/2013 at 2120 54 hr 40 min

  11. Rock Island Dam Smolt Monitoring; 1994-1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Truscott, Keith B.; Fielder, Paul C. (Chelan County Public Utility District No. 1, Power Operations Department, Wenatchee, WA)

    1995-10-01

    Downstream migrating salmon and steelhead trout (Oncorhynchus spp.) smolts were monitored at the Rock Island Dam bypass trap from April 1 - August 31, 1954. This was the tenth consecutive year that the bypass trap was monitored. Data collected included: (1) number of fish caught by species, (2) number of adipose clipped and/or Passive Integrated Transponder (PIT) tagged fish caught by species, (3) daily average riverflow, (4) daily average powerhouse No. 1 and No. 2 flows and daily average spill. These data were transmitted to the Fish Passage Center, which manages the Smolt Monitoring Program throughout the Columbia River Basin. The Smolt Monitoring Program is used to manage the {open_quotes}water budget{close_quotes}, releasing upstream reservoir water storage allocated to supplement river flows to enhance survival of downstream migrating juvenile salmonids. The Rock Island Dam trapping facility collected 37,795 downstream migrating salmonids in 1994. Collected fish included 4 yearling and 4 sub-yearling chinook salmon (O. tshawytscha) that had been previously PIT tagged to help determine migration rates. Additionally, 1,132 sub-yearling chinook, 4,185 yearling chinook, 6,627 steelhead, (O. mykiss) and 422 sockeye (O. nerka) with clipped adipose fins were collected. The middle 80% of the 1994 spring migration (excluding sub-yearling chinooks) passed Rock Island Dam during a 34 day period, April 25 - May 28. Passage rates of chinook and steelhead smolts released from hatcheries and the downstream migration timing of all salmonids are presented. The spring migration timing of juvenile salmonids is strongly influenced by hatchery releases above Rock Island Dam.

  12. Repeatability and genotypic correlations of reproductive and productive traits of crossbred beef cattle dams.

    Science.gov (United States)

    Silva, L N; Gasparino, E; Torres Júnior, R A A; Euclides Filho, K; Silva, L O C; Alencar, M M; Souza Júnior, M D; Battistelli, J V F; Silva, S C C

    2015-05-22

    Beef cattle production requires reproductive efficiency. However, measures of reproductive traits are not usually collected; consequently, correlated traits that could be used as indicators would be useful. We examined associations between measures of reproductive and productive efficiency that could be used as selection indicators. Data from 194 dams of the genetic groups Angus x Nelore, Caracu x Nelore, and Valdostana x Nelore collected over 4 years were used. The reproductive traits analyzed were days to heat (DH), calving interval (CI), days to calving (DC), and pregnancy rate (PR). The productive traits were dam weight (DW), body condition score (BCS), calf weight (CW), and weaning rate (WR). The effects on the model were: year, genetic group, reproductive status (RS), age, reproductive rest, and breed of bull (CW and WR). Multivariate analyses were performed, using the Bayesian approach via Gibbs sampling. We conclude that the reproductive measures are ineffective as selection indicators, whereas using dam weight may be a good alternative.

  13. The geomorphic legacy of small dams — An Austrian study

    NARCIS (Netherlands)

    Poeppl, R.E.; Keesstra, S.D.; Hein, T.

    2015-01-01

    Dams represent one of the most dominant forms of human impact upon fluvial systems during the Anthropocene, as they disrupt the downstream transfer of water and sediments. Removing dams restores river continuity and channel morphology. Both dam construction and dam removal induce geomorphic channel

  14. Mechanical analysis of a gravity dam

    OpenAIRE

    Bergant, Urša

    2012-01-01

    In the first part of our work we will present the water supply project in Obala and backend Karst regions. The use of the river Reka and its tributary Suhorka is essential, since an amassment is going to be built on it. We decided to build the dam from rolled concrete, which is economically and environmentally better than a paved barrier or a classic concrete dam. The second part of our work includes tension and stability program calculations. The primary dimensions of the dam-taken from a te...

  15. Sustainability of dams-an evaluation approach

    Science.gov (United States)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the

  16. Geophysics Methods in Electrometric Assessment of Dams

    Energy Technology Data Exchange (ETDEWEB)

    Davydov, V. A., E-mail: davydov-va@yandex.ru; Baidikov, S. V., E-mail: badikek@mail.ru; Gorshkov, V. Yu., E-mail: vitalaa@yandex.ru; Malikov, A. V., E-mail: alex.mal.1986@mail.ru [Russian Academy of Sciences, Geophysical Institute, Ural Branch (Russian Federation)

    2016-07-15

    The safety assessment of hydraulic structures is proposed to be conducted via geoelectric measurements, which are capable of assessing the health of earth dams in their natural bedding without intervention in their structure. Geoelectric measurements are shown as being capable of pinpointing hazardous parts of a dam, including areas of elevated seepage. Applications of such methods are shown for a number of mini-dams in the Sverdlovsk region. Aparameter (effective longitudinal conductivity) that may be used to monitor the safety of hydraulic structures is proposed. Quantitative estimates of this parameter are given in terms of the degree of safely.

  17. Upstream movements of Atlantic Salmon in the Lower Penobscot River, Maine following two dam removals and fish passage modifications

    Science.gov (United States)

    Izzo, Lisa K.; Maynard, George A.; Zydlewski, Joseph

    2016-01-01

    The Penobscot River Restoration Project (PRRP), to be completed in 2016, involved an extensive plan of dam removal, increases in hydroelectric capacity, and fish passage modifications to increase habitat access for diadromous species. As part of the PRRP, Great Works and Veazie dams were removed, making Milford Dam the first impediment to federally endangered Atlantic Salmon Salmo salar. Upstream habitat access for Atlantic Salmon is dependent upon successful and timely passage at Milford Dam because nearly all suitable spawning habitat is located upstream. In 2014 and 2015, a total of 73 adult salmon were radio-tagged to track their upstream movements through the Penobscot River to assess potential delays at (1) the dam remnants, (2) the confluence of the Stillwater Branch and the main stem of the Penobscot River below the impassable Orono Dam, and (3) the Milford Dam fish lift (installed in 2014). Movement rates through the dam remnants and the Stillwater confluence were comparable to open river reaches. Passage efficiency of the fish lift was high in both years (95% and 100%). However, fish experienced long delays at Milford Dam, with approximately one-third of fish taking more than a week to pass in each year, well below the Federal Energy Regulatory Commission passage standard of 95% within 48 h. Telemetry indicates most fish locate the fishway entrance within 5 h of arrival and were observed at the entrance at all hours of the day. These data indicate that overall transit times through the lower river were comparable to reported movement rates prior to changes to the Penobscot River due to the substantial delays seen at Milford Dam. The results of this study show that while adult Atlantic Salmon locate the new fish lift entrance quickly, passage of these fish was significantly delayed under 2014–2015 operations.

  18. May Day

    Institute of Scientific and Technical Information of China (English)

    孙继山

    2005-01-01

    May Day is of course the traditional worldwide holiday for workers. Be sure, even though the market economy is by now the prevalent economic modus operandi in sodalist as well as capitalist countries, the workers movement has not lost a bit of its importance. The workers are those who keep the economy on track. And the workers are also the consumers, Without consumers, as every first term economy student at any university knows by now, there is no national economic growth. Therefore, the second long holiday of the year will certainly- be conducive to the economy.

  19. Serotonin Deficiency Rescues Lactation on Day 1 in Mice Fed a High Fat Diet

    Science.gov (United States)

    Prichard, Allan S.; Perez, Paola K.; Streckenbach, Liana J.; Olson, Jake M.; Cook, Mark E.; Hernandez, Laura L.

    2016-01-01

    Obesity is an inflammatory state associated with delayed lactogenesis stage II and altered mammary gland morphology. Serotonin mediates inflammation and mammary gland involution. The objective of this study was to determine if a genetic deficiency of tryptophan hydroxylase 1, the rate-limiting enzyme in peripheral serotonin synthesis, would result in an improved ability to lactate in dams fed a high fat diet. Twenty-six female mice were fed a high (HFD) or low fat (LFD) diet throughout pregnancy and lactation. Fourteen mice were genetically deficient for Tph1 (Tph1-/-), and twelve were wild type. Milk yield, pup mortality, and dam weights were recorded and milk samples were collected. On day 10 of lactation, dams were sacrificed and mammary glands were harvested for RT-PCR and histological evaluation. HFD dams weighed more than LFD dams at the onset of lactation. WT HFD dams were unable to lactate on day 1 of lactation and exhibited increased pup mortality relative to all other treatments, including Tph1-/- HFD dams. mRNA expression of immune markers C-X-C motif chemokine 5 and tumor necrosis factor alpha were elevated in WT HFD mammary glands. Mammary gland histology showed a reduced number of alveoli in WT compared to Tph1-/- dams, regardless of diet, and the alveoli of HFD dams were smaller than those of LFD dams. Finally, fatty acid profile in milk was dynamic in both early and peak lactation, with reduced de novo synthesis of fatty acids on day 10 of lactation in the HFD groups. Administration of a HFD to C57BL/6 dams produced an obese phenotype in the mammary gland, which was alleviated by a genetic deficiency of Tph1. Serotonin may modulate the effects of obesity on the mammary gland, potentially contributing to the delayed onset of lactogenesis seen in obese women. PMID:27603698

  20. Reliablity analysis of gravity dams by response surface method

    Science.gov (United States)

    Humar, Nina; Kryžanowski, Andrej; Brilly, Mitja; Schnabl, Simon

    2013-04-01

    A dam failure is one of the most important problems in dam industry. Since the mechanical behavior of dams is usually a complex phenomenon existing classical mathematical models are generally insufficient to adequately predict the dam failure and thus the safety of dams. Therefore, numerical reliability methods are often used to model such a complex mechanical phenomena. Thus, the main purpose of the present paper is to present the response surface method as a powerful mathematical tool used to study and foresee the dam safety considering a set of collected monitoring data. The derived mathematical model is applied to a case study, the Moste dam, which is the highest concrete gravity dam in Slovenia. Based on the derived model, the ambient/state variables are correlated with the dam deformation in order to gain a forecasting tool able to define the critical thresholds for dam management.

  1. Discussion on construction and type selection of China high dams

    Institute of Scientific and Technical Information of China (English)

    Zhou Jianping; Yang Zeyan; Chen Guanfu

    2009-01-01

    At the beginning of 21st century, with the rapid and steady development of China economy, a lot of large scale hydropower projects with large dams from 200 m to 300 m high are being or to be buih. China dam constructions are reaching the level of 300 m high arch dam, 250 high CFRD (concrete face rockfill dam) and 200 m high RCC (roller compacted concrete) gravity dam. Due to the safety and the economy, the type selection for high dams has become the key issue during the argumentation for the hydropower projects, and further efforts are still needed in this aspect for high dams. After reviewing the high dam constructions in China and abroad, authors proposed some advices for the selection of dam types, and hope that it can provide some helpful information for the researches and the design of high dams.

  2. Energy and lipid metabolism gene expression of D18 embryos in dairy cows is related to dam physiological status

    OpenAIRE

    Valour, Damien; Degrelle, Severine; Ponter, Andrew; Giraud-Delville, Corinne; Campion, Evelyne; Guyader-Joly, C; Richard, Christophe; Constant, Fabienne; Humblot, P.; Ponsart, C.; Hue, Isabelle; Grimard, Bénédicte

    2014-01-01

    We analyzed the change in gene expression related to dam physiological status in day (D)18 embryos from growing heifers (GH), early lactating cows (ELC), and late lactating cows (LLC). Dam energy metabolism was characterized by measurement of circulating concentrations of insulin, glucose, IGF-1, nonesterified fatty acids, β-hydroxybutyrate, and urea before embryo flush. The metabolic parameters were related to differential gene expression in the extraembryonic tissues by correlation analysis...

  3. 76 FR 34799 - Permanent Dam Safety Modification at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams, TN

    Science.gov (United States)

    2011-06-14

    ... Permanent Dam Safety Modification at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams, TN AGENCY... various alternatives for permanent modifications to the existing dam facilities at Cherokee, Fort Loudoun, Tellico, and Watts Bar dams in Tennessee. The level of review will be determined after the public...

  4. Wind-Driven Ecological Flow Regimes Downstream from Hydropower Dams

    Science.gov (United States)

    Kern, J.; Characklis, G. W.

    2012-12-01

    challenge, the following study was designed to investigate the potential for wind power integration to alter riparian flow regimes below hydroelectric dams. A hydrological model of a three-dam cascade in the Roanoke River basin (Virginia, USA) is interfaced with a simulated electricity market (i.e. a unit commitment problem) representing the Dominion Zone of PJM Interconnection. Incorporating forecasts of electricity demand, hydro capacity and wind availability, a mixed-integer optimization program minimizes the system cost of meeting hourly demand and reserve requirements by means of a diverse generation portfolio (e.g. nuclear, fossil, hydro, and biomass). A secondary 'balancing' energy market is executed if real-time wind generation is less than the day-ahead forecast, calling upon reserved generation resources to meet the supply shortfall. Hydropower release schedules are determined across a range of wind development scenarios (varying wind's fraction of total installed generating capacity, as well as its geographical source region). Flow regimes for each wind development scenario are compared against both historical and simulated flows under current operations (negligible wind power), as well as simulated natural flows (dam removal), in terms of ecologically relevant flow metrics. Results quantify the ability of wind power development to alter within-week stream flows downstream from hydropower dams.

  5. Particle-bound metal transport after removal of a small dam in the Pawtuxet River, Rhode Island, USA.

    Science.gov (United States)

    Katz, David R; Cantwell, Mark G; Sullivan, Julia C; Perron, Monique M; Burgess, Robert M; Ho, Kay T

    2016-10-06

    The Pawtuxet River in Rhode Island, USA, has a long history of industrial activity and pollutant discharges. Metal contamination of the river sediments is well documented and historically exceeded toxicity thresholds for a variety of organisms. The Pawtuxet River dam, a low-head dam at the mouth of the river, was removed in August 2011. The removal of the dam was part of an effort to restore the riverine ecosystem after centuries of anthropogenic impact. Sediment traps were deployed below the dam to assess changes in metal concentrations and fluxes (Ag, Cd, Cr, Cu, Ni, Pb, and Zn) from the river system into Pawtuxet Cove. Sediment traps were deployed for an average duration of 24 days each, and deployments continued for 15 months after the dam was removed. Metal concentrations in the trapped suspended particulate matter dropped after dam removal (e.g., 460 to 276 mg/kg for Zn) and remained below preremoval levels for most of the study. However, particle-bound metal fluxes increased immediately after dam removal (e.g., 1206 to 4248 g/day for Zn). Changes in flux rates during the study period indicated that river volumetric flow rates acted as the primary mechanism controlling the flux of metals into Pawtuxet Cove and ultimately upper Narragansett Bay. Even though suspended particulate matter metal concentrations initially dropped after removal of the dam, no discernable effect on the concentration or flux of the study metals exiting the river could be associated with removal of the Pawtuxet River dam. Integr Environ Assess Manag 2016;00:000-000. Published 2016. This article is a US Government work and is in the public domain in the USA.

  6. Determination of Seepage and Analysis of Earth Dams (Case Study: Karkheh Dam

    Directory of Open Access Journals (Sweden)

    A. Kamanbedast

    2011-01-01

    Full Text Available Because of the increasing trend of building dam throughout Iran; it is necessary to optimize dam buildings and operations. Dam or Hydropower industry has two types of buildings; normally: (1 Concrete dams (2 Embankment (earth dams. Generally, scientists and engineers use different methods to enhance safety and decrease any errors in calculation due to maintenance of water storage especially hydro structure of the dam. It is necessary to investigate the dam seepage control; commonly used by several methods. Seepage is one of the important issues for design, build and maintenance of dams awareness. Seepage problem and its rules helps scientist to select a suitable method of monitoring and solving such problem. These methods of analysis were carried out at civil and construction project. In this study, one of latest method of investigation of seepage behavior were analytically evaluated and compared with the actual rules. Based on determine results; several suggestions and optimization method were suggested. Therefore, an optimum method was scientifically selected. Besides that, flow condition of porous environment with application of numeric program was analyzed. Finally, all the results were lunched out from seep/w soft which is the most significant program about this matter; use of finite elements method is specified for saturated and unsaturated environment. Thus; leakage and seepage were defined as function of (time and position. Subsequently, the best seepage solutions for the dam constructing were scientifically identified.

  7. Analysis of seismic disaster failure mechanism and dam-break simulation of high arch dam

    Science.gov (United States)

    Zhang, Jingkui; Zhang, Liaojun

    2014-06-01

    Based on a Chinese national high arch dam located in a meizoseismal region, a nonlinear numerical analysis model of the damage and failure process of a dam-foundation system is established by employing a 3-D deformable distinct element code (3DEC) and its re-development functions. The proposed analysis model considers the dam-foundation-reservoir coupling effect, influence of nonlinear contact in the opening and closing of the dam seam surface and abutment rock joints during strong earthquakes, and radiation damping of far field energy dissipation according to the actual workability state of an arch dam. A safety assessment method and safety evaluation criteria is developed to better understand the arch dam system disaster process from local damage to ultimate failure. The dynamic characteristics, disaster mechanism, limit bearing capacity and the entire failure process of a high arch dam under a strong earthquake are then analyzed. Further, the seismic safety of the arch dam is evaluated according to the proposed evaluation criteria and safety assessment method. As a result, some useful conclusions are obtained for some aspects of the disaster mechanism and failure process of an arch dam. The analysis method and conclusions may be useful in engineering practice.

  8. Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland

    Institute of Scientific and Technical Information of China (English)

    M.WIELAND[1; G.F.KIRCHEN[2

    2012-01-01

    The 130 m high Punt dal Gall dam is located at the Swiss-Italian border in the South-eastern part of Switzerland and was completed in 1969.The dam is founded on highly folded and partially crushed dolomite and limestone formations.A grout curtain with an area of 120,000 m 2 was provided for controlling seepage.For the monitoring of the dam deformations five inverted pendulums were installed in the dam and three in the rock foundation of the right abutment outside of the dam.For a seasonal water level fluctuation in the reservoir of about 60 m the maximum amplitude of the radial displacement is 25 mm,which includes both the effects of the water load and temperature effects.Furthermore a comprehensive geodetic network was established,57 joint meters were installed and cracks in the crest gallery are monitored by crack meters.There are also thermometers,piezometers and rocmeters.Springs at the left and right banks of the dam are monitored and chemical analyses of the seepage water and springs are performed regularly.The dam is equipped with strong motion instruments and several near-field earthquakes have been recorded in the past.The paper describes the long-term safety monitoring of this 42 years old arch dam.A short description of the Swiss practice in dam safety monitoring and emergency planning is also given.

  9. Numerical Study of Two-Dimensional Viscous Flow over Dams

    Institute of Scientific and Technical Information of China (English)

    王利兵; 刘宇陆; 涂敏杰

    2003-01-01

    In this paper, the characteristics of two-dimensional viscous flow over two dams were numerically investigated. The results show that the behavior of the vortices is closely related to the space between two dams, water depth, Fr number and Reynolds number. In addition, the flow properties behind each dam are different, and the changes over two dams are more complex than over one dam. Finally, the relevant turbulent characteristics were analyzed.

  10. Research on Dam Simulation System Based on OpenGL

    Science.gov (United States)

    Li, Kairong; Wang, Juanni; Zuo, Kui; Yun, Jian

    Dam, not only has great ability to alleviate water shortages especially during the dry season which improve hydropower capacity, but also plays an imporant rule in the river ecosystem. Dam has significant effect in improving our water environment and protecting ecological system.This paper copes with the three-dimensional model of dams and discusses OpenGL modeling, lighting, material, model transformation, perspective transformation technologies to achieve visualization of the dam, and eventually we visualize the dam through concrete examples.

  11. Final Design Analysis : Lake Ladora Dam Repair

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report is intended to present Rocky Mountain Arsenal with details concerning the remedial repair for Ladora Dam to meet the geotechnical concerns and hydrologic...

  12. Chemical - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  13. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This paper summarizes the conclusions of the annual inspections of French dams in operation (fissures, water oozing, concrete swelling etc..). Only the observations which require a special attention are reported. (J.S.)

  14. White Sturgeon Passage at The Dalles Dam

    Science.gov (United States)

    ,

    2008-01-01

    Researchers at the USGS Western Fisheries Research Center's Columbia River Research Laboratory, working with the U.S. Army Corps of Engineers, sought to better understand upstream and downstream passage of white sturgeon at dams. A study at The Dalles Dam provided the opportunity to compare two fish ladders; one that passes sturgeon upstream to one that does not, to determine if subtle differences in construction result in better passage of white sturgeon. Researchers conducted a study using a combination of acoustic and radio telemetry technologies to obtain information on juvenile and adult white sturgeon near The Dalles Dam, with the objectives of characterizing the distribution and movements of white sturgeon in the immediate vicinity of the dam and to determine timing and routes of upstream and downstream passage.

  15. Physical - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  16. Biological - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  17. System-Wide Significance of Predation on Juvenile Salmonids in Columbia and Snake River Reservoirs : Annual Report 1992.

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, James H.; Poe, Thomas P.

    1993-12-01

    Northern squawfish (Ptychocheilus oregonensis) predation on juvenile salmonids was characterized during 1992 at ten locations in the Columbia River below Bonneville Dam and at three locations in John Day Reservoir. During the spring and summer, 1,487 northern squawfish were collected in the lower Columbia River and 202 squawfish were sampled in John Day Reservoir. Gut content data, predator weight, and water temperature were used to compute a consumption index (CI) for northern squawfish, and overall diet was also described. In the Columbia River below Bonneville Dam, northern squawfish diet was primarily fish (spring 69%; summer 53%), most of which were salmonids. Salmonids were also the primary diet component in the Bonneville Dam tailrace, John Day Dam forebay, and the McNary Dam tailrace. Crustaceans were the dominant diet item at the John Day mid-reservoir location, although sample sizes were small. About half of the non-salmonid preyfish were sculpins. The consumption index (CI) of northern squawfish was generally higher during summer than during spring. The highest CI`s were observed during summer in the tailrace boat restricted zones of Bonneville Dam (CI = 7.8) and McNary Dam (CI = 4.6). At locations below Bonneville Dam, CI`s were relatively low near Covert`s Landing and Rooster Rock, higher at four locations between Blue Lake and St. Helens, and low again at three downriver sites (Kalama, Ranier, and Jones Beach). Northern squawfish catches and CI`s were noticeably higher throughout the lower Columbia compared to mid-reservoir sites further upriver sampled during 1990--92. Predation may be especially intense in the free-flowing section of the Columbia River below Bonneville Dam. Smallmouth bass (Micropterus dolomieui; N = 198) ate mostly fish -- 25% salmonids, 29% sculpins, and 46% other fish. Highest catches of smallmouth bass were in the John Day Dam forebay.

  18. Risk assessment of tailings facility dam failure

    OpenAIRE

    Hadzi-Nikolova, Marija; Mirakovski, Dejan; Stefanova, Violeta

    2011-01-01

    This paper presents the consequences of tailings facility dam failure and therefore the needs for its risk assessment. Tailings are fine-grained wastes of the mining industry, output as slurries, due to mixing with water during mineral processing. Tailings dams vary a lot as it is affected by: tailings characteristics and mill output, site characteristics as: topography, hydrology, geology, groundwater, seismicity and available material and disposal methods. The talings which accumulat...

  19. Stability and performance of older dams

    Energy Technology Data Exchange (ETDEWEB)

    Dharmawardene, W.; Herbig, A.; Morrison, J. [Alberta Environment, AB (Canada); Chan, D. [Alberta Univ., Edmonton, AB (Canada). Dept. of Civil and Environmental Engineering

    2003-07-01

    There are 1300 licensed dams in Alberta. Most were designed and constructed between the late 1940s and the early 1960s. As a rule, compacted earthfill in preglacial and interglacial valleys in southern Alberta was used to construct all dams of moderate height. At these dam sites, the foundations are of valley infill alluvial soils underlain by weak rocks. The best prevailing engineering practices at the time were used to design these dams. It included drilling, soil testing prior to and during construction, and some stability analyses. Despite these measures, a number of the dams built on soft clays suffered significant deformations and cracking of the embankment during construction. A re-examination of the stability of some of the older dams in Alberta, owned by the provincial department of the Environment, was undertaken six years ago using currently accepted design practices. Allowance was made in the new analyses for the presence of shear zones and fissures in the foundation soils, as well as softening caused by wetting. Despite many years of apparently satisfactory service, Factors of Safety that were marginal or deficient were discovered at many dams. The authors presented case histories of three older dams (North and South McGregor, and North Ridge, all located in southern Alberta) for which the long term Factors of Safety were marginal under normal loading. A number of criteria, such as deformation, stress strain curves of foundation materials and the consequence of failure were taken into consideration in assessing and confirming the requirement for repair before any structural modifications were undertaken. Some of the repairs that were carried out were also briefly described. 12 refs., 4 tabs., 5 figs.

  20. Walter Bouldin Dam failure and reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    Walter Bouldin is one of several hydroelectric developments of Alabama Power Company. On February 10, 1975, an earth embankment section of Walter Bouldin Dam was breached, causing total evacuation of the forebay reservoir and rendering the 225-MW power plant inoperable. The Federal Power Commission instituted an investigation of the dam failure, and a report on the investigation was published in February 1976. Subsequently, an evidentiary hearing was held before an administrative law judge who issued his initial decision on August 19, 1976. The Commission, on April 21, 1977, issued its Opinion No. 795 in which it adopted the initial decision with modifications and terminated the investigation of failure of Walter Bouldin Dam. Opinion No. 795 directs the staff of the Bureau of Power to prepare, for the future guidance of the Commission, a report on the deficiencies which were found in its investigation, together with advice as to how such deficiencies have been and should be remedied. Also, it directs the staff of the Bureau of Power to address certain general recommendations included in the initial decision. This report was prepared in response to that directive and summaries information on the dam failure and its investigation; the evidentiary hearing; the judge's recommendations, the reconstruction of the Bouldin Dam; and the evalution and status of the Federal Energy Regulatory Commission Dam safety program. (LCL)

  1. Reliability Analysis of High Rockfill Dam Stability

    Directory of Open Access Journals (Sweden)

    Ping Yi

    2015-01-01

    Full Text Available A program 3DSTAB combining slope stability analysis and reliability analysis is developed and validated. In this program, the limit equilibrium method is utilized to calculate safety factors of critical slip surfaces. The first-order reliability method is used to compute reliability indexes corresponding to critical probabilistic surfaces. When derivatives of the performance function are calculated by finite difference method, the previous iteration’s critical slip surface is saved and used. This sequential approximation strategy notably improves efficiency. Using this program, the stability reliability analyses of concrete faced rockfill dams and earth core rockfill dams with different heights and different slope ratios are performed. The results show that both safety factors and reliability indexes decrease as the dam’s slope increases at a constant height and as the dam’s height increases at a constant slope. They decrease dramatically as the dam height increases from 100 m to 200 m while they decrease slowly once the dam height exceeds 250 m, which deserves attention. Additionally, both safety factors and reliability indexes of the upstream slope of earth core rockfill dams are higher than that of the downstream slope. Thus, the downstream slope stability is the key failure mode for earth core rockfill dams.

  2. OVERVIEW OF DAM GULLY EROSION RESEARCH

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    Traditionally gully erosion has been identified with the dissection of the landscape in agricultural settings but it is also recognized as a prevalent erosion feature in earthen dam auxiliary spillways and embankments. Flows through earthen spillways and over dam embankments, due to large rainfall events, have the potential to erode and breach the dam or spillway and result in catastrophic releases from the reservoir. The gully erosion process in an earthen spillway or on an embankment can be characterized by stages of initiation, development, and migration of a headcut. A headcut is defined as a near vertical drop at the upstream end of a gully. The rate of headcut migration is important in determining the breach potential of an earthen spillway and dam embankment. A research program is being conducted to examine the gully erosion processes of earthen dam auxiliary spillways and embankments. This paper describes: 1) the unique test facilities constructed to examine the dominant factors affecting the erosion of earthen spillways and embankments; 2) the observations of the erosion processes and results to date; and 3) the predictive relationships that have been developed for dam gully erosion research at the ARS Hydraulic Engineering Research Unit laboratory in Stillwater, OK.

  3. Distributional Impacts of Large Dams in China

    Science.gov (United States)

    Bao, X.

    2010-12-01

    Dams on a river are believed to have heterogeneous impacts to the upstream, local and downstream areas. Generally, irrigation dams will bring benefits to the downstream by facilitating more irrigation, while it will bring negative impacts to upstream due to inundation or no impact to local area as a combination result of population dislocation and economic benefits. This paper checked the impacts of large dams (above 100 meters) on the upstream, downstream and local area, using 2000-2008 county level data in China. Robust heterogeneous impacts of different categories of dams (mainly dams serving for irrigation, hydropower, or other purposes) were found on different areas, using IV regression approaches. Dams higher than 100 meters are significantly and heterogeneously impacting agricultural production, urban employment and rural per capita income. Its beneficial impact on agriculture production is significant for downstream especially in continuous drought years. But its impacts on social welfare indicators, such as primary school enrollment and hospital beds, are not heterogeneously different across regions.

  4. Estimating flood inundation caused by dam failures

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada). School of Engineering; Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-01-15

    Recent advancements in modelling inundation due to dam failures have allowed easier and more illustrative analyses of potential outcomes. This paper described new model and mapping capabilities available using the HEC-RAS hydraulic model in concert with geographic information systems (GIS). The study area was the upper reaches of Canagagigue Creek and the Woolwich Dam near Elmira, Ontario. A hydraulic analysis of a hypothetical dam failure was developed based on the summer probable maximum flood (PMF) event. Limits extended from Woolwich Dam to downstream of the Town of Elmira. An incoming summer PMF hydrograph was set as the upstream boundary condition in the upstream model. Simulation parameters include simulation time-step; implicit weighting factor; water surface calculation tolerance; and output calculation interval. Peak flows were presented, as well as corresponding flood inundation results through the Town of Elmira. The hydraulic model results were exported to a GIS in order to develop inundation maps for emergency management planning. Results from post-processing included inundation maps for each of the simulated time-steps as well as an inundation animation for the duration of the dam breach. It was concluded that the modelling tools presented in the study can be applied to other dam safety assessment projects in order to develop effective and efficient emergency preparedness plans through public consultation and the establishment of impact zones. 1 tab., 2 figs.

  5. Movements of dams milked for fermented horse milk production in Mongolia.

    Science.gov (United States)

    Bat-Oyun, Tserenpurev; Ito, Takehiko Y; Purevdorj, Yadamjav; Shinoda, Masato; Ishii, Satomi; Buho, Hoshino; Morinaga, Yuki

    2017-08-18

    Airag, (Fermented horse milk) is a traditional milk product in Mongolia. Herders separate foals from their dams and tie them at a milking site during the daytime to produce airag. To evaluate the effects of horse management on the movement of dams, we tracked three dams in a herd in camp 1 during summer and camp 2 during autumn of 2013 and analyzed their movements during the milking (daytime) and non-milking (nighttime) periods in an area famous for its high-quality airag. Dams were gathered every 1.7 ± 0.0 h between 07.46 and 15.47 hours at the milking sites and milked 4.6 ± 0.2 times/day during the study period (86 days). Daily cumulative and maximum linear distances from the milking sites were longer (P < 0.01) during the non-milking period than during the milking period. Daily home ranges were 91 and 26 times greater during the non-milking period (P < 0.001) in camps 1 and 2, respectively. The greater range during the non-milking period would reflect the spatial distributions of water, salt and forage. The dams initially used similar areas and gradually shifted their daily home ranges after several days. This shift suggests that the dams grazed farther afield as forage availability declined around the milking site. For better airag production and sustainable pasture use, our results provide insights useful for evaluating the effects of milking management on vegetation and soil in those pastures, for selecting the appropriate milking times and frequency, and for choosing the right timing to shift milking sites. © 2017 Japanese Society of Animal Science.

  6. Use and application of inflatable dam seals in large concrete dams

    Energy Technology Data Exchange (ETDEWEB)

    Dickes, G. [Structural Preservation Systems Inc., Hanover, MD (United States)

    2001-10-01

    The successful installation of inflatable dam seals has been accomplished at several large concrete dams in the United States. This accomplishment was recently realized for the first time in Canada. The minimization of water intrusion caused by failed water stops in monolithic dams by a small diameter inflatable seal is one of the many uses for the device. Many problems encountered at large concrete dams are related to stress control of alkali-aggregate or alkali silica reaction (AAR, ASR), and the inflatable dam seal fits in as part of this control system. Many of the problems with concrete dams are due to AAR which causes concrete to expand, resulting in cracking of concrete and misalignment of equipment as two of the most important issues. A transverse vertical saw cut through the upper section of the concrete structure was one of the methods used to alleviate the stresses brought about by AAR. This method has been used on a number of occasions in both Canada and the United States. Once the saw cut is complete, from the upstream face to the downstream face, controlling the water flow in the kerf (13-19 millimeter) presents a major challenge. Successfully sealing failed water stops and saw cuts was accomplished by installing inflatable dam seals with vertical heights in excess of 38 meters. A specific seal must be designed in each case. Several elements of the composite construction seal meet the engineering requirements set forth by Dam Safety Officials and Engineers and Owners. Some case histories were presented, namely the Harry S. Truman Dam in Missouri, the Tennessee Valley Authority at several sites, the Hiwassee Dam in North Carolina, the Fontana Dam in Tennessee, and the Mactaquac Generating Station in New Brunswick. 10 refs., 11 figs.

  7. Sediment and 137Cs transport and accumulation in the Ogaki Dam of eastern Fukushima

    Science.gov (United States)

    Yamada, Susumu; Kitamura, Akihiro; Kurikami, Hiroshi; Yamaguchi, Masaaki; Malins, Alex; Machida, Masahiko

    2015-01-01

    The Ogaki Dam Reservoir is one of the principal irrigation dam reservoirs in the Fukushima Prefecture and its upstream river basin was heavily contaminated by radioactivity from the Fukushima Daiichi Nuclear Power Plant accident. For the purpose of environmental assessment, it is important to determine the present condition of the water in the reservoir and to understand the behavior of sediment-sorbed radioactive cesium under different modes of operation of the dam, as these factors affect further contamination of arable farmlands downstream of the reservoir through sediment migration. This paper addresses this issue with numerical simulations of fluvial processes in the reservoir using the two-dimensional Nays2D code. We distinguish three grades of sediment (clay, silt, and sand), as cesium adherence depends on sediment grain size and surface area. Boundary conditions for the simulations were informed by monitoring data of the upstream catchment and by the results from a separate watershed simulation for sediment transport into the reservoir. The performance of the simulation method was checked by comparing the results for a typhoon flood in September 2013 against field monitoring data. We present results for sediment deposition on the reservoir bed and the discharge via the dam under typical yearly flood conditions, for which the bulk of annual sediment migration from the reservoir occurs. The simulations show that almost all the sand and silt that enter into the reservoir deposit onto the reservoir bed. However, the locations where they tend to deposit differ, with sand tending to deposit close to the entrance of the reservoir, whereas silt deposits throughout the reservoir. Both sand and silt settle within a few hours of entering the reservoir. In contrast, clay remains suspended in the reservoir water for a period as long as several days, thus increasing the amount that is discharged downstream from the reservoir. Under the current operating mode of the dam

  8. Game model of safety monitoring for arch dam deformation

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Arch dam deformation is comprehensively affected by water pressure,temperature,dam’s structural behavior and material properties as well as other factors.Among them the water pressure and temperature are external factors(source factors) that cause dam deformation,and dam’s structural behavior and material properties are the internal factors of deformation(resistance factors).The dam deformation is the result of the mutual game playing between source factors and resistance factors.Therefore,resistance factors of structure and materials that reflect resistance character of arch dam structure are introduced into the traditional model,where structure factor is embodied by the flexibility coefficient of dam body and the maximum dam height,and material property is embodied by the elastic modulus of dam.On the basis of analyzing the correlation between dam deformation and resistance factors,the game model of safety monitoring for arch dam deformation is put forward.

  9. The interplay of activists and dam developers : the case of Myanmar’s mega-dams

    NARCIS (Netherlands)

    Kirchherr, Julian; J. Charles, Katrina; Walton, Matthew J.

    2017-01-01

    Scholars investigating activism against large dam developments in Asia usually focus on those campaigning, but not on those the campaigns are aimed at–the dam developers. Yet the developers’ perspective is crucial to comprehensively understand the dynamics of social and environmental activism in

  10. Challenges of high dam construction to computational mechanics

    Institute of Scientific and Technical Information of China (English)

    ZHANG Chuhan

    2007-01-01

    The current situations and growing prospects of China's hydro-power development and high dam construction are reviewed,giving emphasis to key issues for safety evaluation of large dams and hydro-power plants,especially those associated with application of state-of-the-art computational mechanics.These include but are not limited to:stress and stability analysis of dam foundations under external loads;earthquake behavior of dam-foundation-reservoir systems,mechanical properties of mass concrete for dams,high velocity flow and energy dissipation for high dams,scientific and technical problems of hydro-power plants and underground structures,and newly developed types of dam-Roll Compacted Concrete (RCC) dams and Concrete Face Rock-fill (CFR)dams.Some examples demonstrating successful utilizations of computational mechanics in high dam engineering are given,including seismic nonlinear analysis for arch dam foundations,nonlinear fracture analysis of arch dams under reservoir loads,and failure analysis of arch dam-foundations.To make more use of the computational mechanics in high dam engineering,it is pointed out that much research including different computational methods,numerical models and solution schemes,and verifications through experimental tests and filed measurements is necessary in the future.

  11. Changes in liveweight and behaviour of alpaca dams and offspring following weaning.

    Science.gov (United States)

    Pollard, J C; Littlejohn, R P; Davis, G H

    1993-12-01

    The effects of offspring sex, weight, age, and level of interaction with the dam on responses to weaning were examined to assist in the development of a weaning protocol for alpacas. In the first study, preand post-weaning activities, and weight change over Days -12-0,0-7 and 7-16 with respect to weaning, were recorded for 20 dam-offspring (hembra-cria) pairs aged 81-200 days. Pre-weaning changes in dam and offspring weights were positively related (Phembra weight change followed the same pattern. Over Days 0-2, grazing and sitting activities of hembras and crias were replaced by standing and walking along paddock fencelines, although by Day 2 fenceline activities had decreased (Phembra-cria pairs aged 124-160 days. During 10 hours of observation on Days -5 and -4, the total duration of sucking by individual crias varied from 0-18 minutes, and the mean +/- SEM duration of sucking was 1.94 +/- 0.113 minutes. Cria sucking behaviour was positively related to growth rate prior to and weight at weaning (Phembras lost weight over Days 0-8 and 8-16. The changes in growth rate and behaviour in Studies 1 and 2 indicated that weaning can be stressful for hembras and crias. However, there was no evidence from either study that pre-weaning behavioural or physical characteristics were related to the changes.

  12. Assessing distribution of migratory fishes and connectivity following complete and partial dam removals in a North Carolina River

    Science.gov (United States)

    Raabe, Joshua K.; Hightower, Joseph E.

    2014-01-01

    Fish, especially migratory species, are assumed to benefit from dam removals that restore connectivity and access to upstream habitat, but few studies have evaluated this assumption. Therefore, we assessed the movement of migratory fishes in the springs of 2008 through 2010 and surveyed available habitat in the Little River, North Carolina, a tributary to the Neuse River, after three complete dam removals and one partial (notched) dam removal. We tagged migratory fishes with PIT tags at a resistance-board weir located at a dam removal site (river kilometer [rkm] 3.7) and followed their movements with an array of PIT antennas. The river-wide distribution of fish following removals varied by species. For example, 24–31% of anadromous American Shad Alosa sapidissima, 45–49% of resident Gizzard Shad Dorosoma cepedianum, and 4–11% of nonnative Flathead CatfishPylodictis olivaris passed the dam removal site at rkm 56 in 2009 and 2010. No preremoval data were available for comparison, but reach connectivity appeared to increase as tagged individuals passed former dam sites and certain individuals moved extensively both upstream and downstream. However, 17–28% did not pass the partially removed dam at rkm 7.9, while 20–39% of those that passed remained downstream for more than a day before migrating upstream. Gizzard Shad required the deepest water to pass this notched structure, followed by American Shad then Flathead Catfish. Fish that passed the notched dam accessed more complex habitat (e.g., available substrate size-classes) in the middle and upper reaches. The results provide strong support for efforts to restore currently inaccessible habitat through complete removal of derelict dams.

  13. Predicting the thermal effects of dam removal on the Klamath River.

    Science.gov (United States)

    Bartholow, John M; Campbell, Sharon G; Flug, Marshall

    2004-12-01

    The Klamath River once supported large runs of anadromous salmonids. Water temperature associated with multiple mainstem hydropower facilities might be one of many factors responsible for depressing Klamath salmon stocks. We combined a water quantity model and a water quality model to predict how removing the series of dams below Upper Klamath Lake might affect water temperatures, and ultimately fish survival, in the spawning and rearing portions of the mainstem Klamath. We calibrated the water quantity and quality models and applied them for the hydrometeorological conditions during a 40-year postdam period. Then, we hypothetically removed the dams and their impoundments from the models and reestimated the river's water temperatures. The principal thermal effect of dam and reservoir removal would be to restore the timing (phase) of the river's seasonal thermal signature by shifting it approximately 18 days earlier in the year, resulting in river temperatures that more rapidly track ambient air temperatures. Such a shift would likely cool thermal habitat conditions for adult fall chinook (Oncorhynchus tshawytscha) during upstream migration and benefit mainstem spawning. By contrast, spring and early summer temperatures could be warmer without dams, potentially harming chinook rearing and outmigration in the mainstem. Dam removal might affect the river's thermal regime during certain conditions for over 200 km of the mainstem.

  14. Drainage events from a glacier-dammed lake, Bear Glacier, Alaska: Remote sensing and field observations

    Science.gov (United States)

    Wilcox, A. C.; Wade, A. A.; Evans, E. G.

    2014-09-01

    We investigated drainage events from a glacier-dammed lake on Bear Glacier, Alaska, and associated outburst floods and hazards. The glacier-dammed lake, which we call Ice Lake, is 17.5 km up-glacier from Bear Glacier's terminus at Bear Glacier Lake. We combine field observations and remote sensing to examine temporal changes in the size of Ice Lake, the frequency and timing of its drainage, and down-glacier propagation of its outburst floods. We found that in recent years, Ice Lake has likely drained every year or two, in late summer or fall (August-October), with outbursts generally following the damming of sufficient water to create a lake area of between 0.35 and 0.5 km2. Ice Lake has migrated downvalley to the south since the 1990s, likely as a result of thinning of the glacier that dams it. In situ measurements of a drainage event in October 2010 showed that Ice Lake drained over a period of days, which manifested at Bear Glacier Lake as a gradual, multiday increase and then decrease in water levels. Glacial lake outburst flooding at Bear Glacier creates risks for sea kayakers in Bear Glacier Lake and may be relevant to understanding the effects of climate warming on glacier-dammed and proglacial lakes.

  15. Design and construction of Nemiscau-1 Dam, the first asphalt core rockfill dam in North America

    Energy Technology Data Exchange (ETDEWEB)

    Alicescu, V.; Tournier, J.P. [Hydro-Quebec, Montreal, PQ (Canada); Vannobel, P. [Societe d' Energie de la Baie James, Montreal, PQ (Canada)

    2008-07-01

    The concept of asphalt as a waterproofing medium inside embankment dams was originally developed in Germany in the 1960s. More than 100 asphalt core rockfill (ACRD) dams have been completed or are under construction. They all have a strong record without any seepage problems or required maintenance. After using the glacial till as waterproofing material for its embankment dams for more than 50 years, Hydro-Quebec is now looking to develop new dam concepts, mainly for the zones where natural waterproofing materials do not exist. In order to do so, the company has decided to design and construct the Nemiscau-1 Dam as a prototype ACRD. This paper presented the detailed design criteria, technical specifications as well as some information concerning the construction of the dam such as asphalt mix design. The given dam site, geology and materials is well suited for a dam with an asphalt core and the chosen core thickness of minimum 400 mm was found to be appropriate, given the small net water head. The main reservoir levels as well as the characteristics of the dam were also listed. Information on the general construction of the dam was provided. It was concluded that the longitudinal profile of the rock excavation and concrete plinth must be optimized, with an optimum balance between the rock excavation, the volume and shape of the concrete plinth and finally, the placement of the asphalt core with the manual method. Several combinations of these 3 elements must be analyzed at the design stage and the most cost effective one should be applied on site. 5 tabs., 7 figs.

  16. An updated numerical simulation of the ground-water flow system for the Castle Lake debris dam, Mount St. Helens, Washington, and implications for dam stability against heave

    Science.gov (United States)

    Roeloffs, Evelyn A.

    1994-01-01

    A numerical simulation of the ground-water flow system in the Castle Lake debris dam, calibrated to data from the 1991 and 1992 water years, was used to estimate factors of safety against heave and internal erosion. The Castle Lake debris dam, 5 miles northwest of the summit of Mount St. Helens, impounds 19,000 acre-ft of water that could pose a flood hazard in the event of a lake breakout. A new topographic map of the Castle Lake area prior to the 1980 eruption of Mount St. Helens was prepared and used to calculate the thickness of the debris avalanche deposits that compose the dam. Water levels in 22 piezometers and discharges from seeps on the dam face measured several times per year beginning in 1990 supplemented measurements in 11 piezometers and less frequent seep discharge measurements made since 1983. Observations in one group of piezometers reveal heads above the land surface and head gradients favoring upward flow that correspond to factors of safety only slightly greater than 2. The steady-state ground-water flow system in the debris dam was simulated using a threedimensional finite difference computer program. A uniform, isotropic model having the same shape as the dam and a hydraulic conductivity of 1.55 ft/day simulates the correct water level at half the observation points, but is in error by 10 ft or more at other points. Spatial variations of hydraulic conductivity were required to calibrate the model. The model analysis suggests that ground water flows in both directions between the debris dam and Castle Lake. Factors of safety against heave and internal erosion were calculated where the model simulated upward flow of ground water. A critical gradient analysis yields factors of safety as low as 2 near the piezometers where water level observations indicate low factors of safety. Low safety factors are also computed near Castle Creek where slumping was caused by a storm in January, 1990. If hydraulic property contrasts are present in areas of the

  17. EXPERIMENTAL INVESTIGATION OF THE FAILURE OF CASCADE LANDSLIDE DAMS

    Institute of Scientific and Technical Information of China (English)

    NIU Zhi-pan; XU Wei-lin; LI Nai-wen; XUE Yang; CHEN Hua-yong

    2012-01-01

    This paper preseuts results of model tests for the landslide dam failure of a single dam and cascade dams in a sloping channel.The dams were designed to be regular trapezoid with fine sand.A new measuring method named the labeled line locating method was used to digitalize the captured instantaneous pictures.Under two differem inflow discharges,the morphological evolution and the flow patterns during one dam failure and the failure of cascade dams were investigated.The results indicate that when the inflow discharge is large,the deformation pattern of the downstream dam is similar to that of the upstream dam,and both dams are characterized with the overtopping scour throughout the dam failure process.When the inflow discharge is small,the upstream dam is scoured mainly through a sluice slot formed by the longitudinal incision,and the downstream dam is characterized with the overtopping scour.The data set presented in this paper can be used for the validation of numerical models and provide a reference for the flood risk management of cascade landslide dams.

  18. Toward policies and decision-making for dam removal.

    Science.gov (United States)

    Doyle, Martin W; Harbor, Jon M; Stanley, Emily H

    2003-04-01

    Dam removal has emerged as a critical issue in environmental management. Agencies responsible for dams face a drastic increase in the number of potential dam removals in the near future. Given limited resources, these agencies need to develop ways to decide which dams should be removed and in what order. The underlying science of dam removal is relatively undeveloped and most agencies faced with dam removal lack a coherent purpose for removing dams. These shortcomings can be overcome by the implementation of two policies by agencies faced with dam removal: (1) the development and adoption of a prioritization scheme for what constitutes an important dam removal, and (2) the establishment of minimum levels of analysis prior to decision-making about a dam removal. Federal and state agencies and the scientific community must encourage an initial experimental phase of dam removal during which only a few dams are removed, and these are studied intensively. This will allow for the development of the fundamental scientific understanding needed to support effective decision-making in the future and minimize the risk of disasters arising from poorly thought out dam removal decisions.

  19. Experimental infection of conventional nursing pigs and their dams with Porcine deltacoronavirus.

    Science.gov (United States)

    Vitosh-Sillman, Sarah; Loy, John Dustin; Brodersen, Bruce; Kelling, Clayton; Doster, Alan; Topliff, Christina; Nelson, Eric; Bai, Jianfa; Schirtzinger, Erin; Poulsen, Elizabeth; Meadors, Barbara; Anderson, Joseph; Hause, Benjamin; Anderson, Gary; Hesse, Richard

    2016-09-01

    Porcine deltacoronavirus (PDCoV) is a newly identified virus that has been detected in swine herds of North America associated with enteric disease. The aim of this study was to demonstrate the pathogenicity, course of infection, virus kinetics, and aerosol transmission of PDCoV using 87 conventional piglets and their 9 dams, including aerosol and contact controls to emulate field conditions. Piglets 2-4 days of age and their dams were administered an oronasal PDCoV inoculum with a quantitative real-time reverse transcription (qRT)-PCR quantification cycle (Cq) value of 22 that was generated from a field sample having 100% nucleotide identity to USA/Illinois121/2014 determined by metagenomic sequencing and testing negative for other enteric disease agents using standard assays. Serial samples of blood, serum, oral fluids, nasal and fecal swabs, and tissues from sequential autopsy, conducted daily on days 1-8 and regular intervals thereafter, were collected throughout the 42-day study for qRT-PCR, histopathology, and immunohistochemistry. Diarrhea developed in all inoculated and contact control pigs, including dams, by 2 days post-inoculation (dpi) and in aerosol control pigs and dams by 3-4 dpi, with resolution occurring by 12 dpi. Mild to severe atrophic enteritis with PDCoV antigen staining was observed in the small intestine of affected piglets from 2 to 8 dpi. Mesenteric lymph node and small intestine were the primary sites of antigen detection by immunohistochemistry, and virus RNA was detected in these tissues to the end of the study. Virus RNA was detectable in piglet fecal swabs to 21 dpi, and dams to 14-35 dpi.

  20. Dam-breach analysis and flood-inundation mapping for Lakes Ellsworth and Lawtonka near Lawton, Oklahoma

    Science.gov (United States)

    Rendon, Samuel H.; Ashworth, Chad E.; Smith, S. Jerrod

    2012-01-01

    flood scenario and a sunny-day dam-breach scenario, as well as for maximum flood-inundation elevations and flood-wave arrival times for selected bridge crossings. Some areas of concern near the city of Lawton, if a dam breach occurs at Lakes Ellsworth or Lawtonka, include water treatment plants, wastewater treatment plants, recreational areas, and community-services offices.

  1. International small dam safety assurance policy benchmarks to avoid dam failure flood disasters in developing countries

    Science.gov (United States)

    Pisaniello, John D.; Dam, Tuyet Thi; Tingey-Holyoak, Joanne L.

    2015-12-01

    In developing countries small dam failure disasters are common yet research on their dam safety management is lacking. This paper reviews available small dam safety assurance policy benchmarks from international literature, synthesises them for applicability in developing countries, and provides example application through a case study of Vietnam. Generic models from 'minimum' to 'best' practice (Pisaniello, 1997) are synthesised with the World Bank's 'essential' and 'desirable' elements (Bradlow et al., 2002) leading to novel policy analysis and design criteria for developing countries. The case study involved 22 on-site dam surveys finding micro level physical and management inadequacies that indicates macro dam safety management policy performs far below the minimum benchmark in Vietnam. Moving assurance policy towards 'best practice' is necessary to improve the safety of Vietnam's considerable number of hazardous dams to acceptable community standards, but firstly achieving 'minimum practice' per the developed guidance is essential. The policy analysis/design process provides an exemplar for other developing countries to follow for avoiding dam failure flood disasters.

  2. Re-grouting of Maroon Dam foundation

    Energy Technology Data Exchange (ETDEWEB)

    Palassi, M. [Tehran Univ. (Iran, Islamic Republic of). Dept. of Civil Engineering; Sharghi, A. [JTMA Co., Tehran (Iran, Islamic Republic of)

    2003-07-01

    The Maroon dam, built on the Maroon River in the Khoozestan province (southwest) of Iran, has a height of 176 metres and a 1.2 billion cubic metre reservoir. It is one of the largest embankment dams in Iran. A number of unpredicted inflows of water into tunnels and other underground openings occurred during the first impoundment of the Maroon dam. Impoundment was halted and the reservoir was emptied to correct the problem. This paper reviews the measures that were implemented during the remediation process, and presented an evaluation of the effectiveness of the process. The foundation treatment involved placing concrete in the caverns, constructing a concrete lining, and extending the grout curtain. The grouting procedure was also described. The overall effectiveness of the concrete work and grouting resulted in a reduction in leakage from 8.5 cubic metres per second to a more acceptable 10 litres per second. 8 figs.

  3. Channel changes downstream from a dam

    Science.gov (United States)

    Hadley, R.F.; Emmett, W.W.

    1998-01-01

    A flood-control dam was completed during 1979 on Bear Creek, a small tributary stream to the South Platte River in the Denver, Colorado, area. Before and after dam closure, repetitive surveys between 1977 and 1992 at five cross sections downstream of the dam documented changes in channel morphology. During this 15-year period, channel width increased slightly, but channel depth increased by more than 40 percent. Within the study reach, stream gradient decreased and median bed material sizes coarsened from sand in the pools and fine gravel on the riffle to a median coarse gravel throughout the reach. The most striking visual change was from a sparse growth of streamside grasses to a dense growth of riparian woody vegetation.

  4. Design of tailing dam using red mud

    Science.gov (United States)

    Rout, Subrat; Sahoo, Tapaswini; Das, Sarat

    2013-06-01

    Red mud, waste industrial product from aluminum industries produced approximately 75 million tonnes every year with less than half of this is used. Storage of this unutilized red mud takes vast tracts of usable land and pollutes, land, air and water. Construction of high embankments, under passes, flyovers, tailing dams uses vast tract of natural resources (top soil) is also matter of concern as its takes thousands of years to form the natural soil. This paper discusses use of red mud for construction of tailing dam based on laboratory findings and finite element analysis. The geotechnical properties such as plasticity, compaction, permeability, shear strength characteristics and dispersion of red mud are presented. Stability and seepage analysis of tailing dams as per finite element analysis using the above geotechnical parameters is presented.

  5. Study on dynamic anti-sliding stability of a high gravity dam considering complex dam foundation

    Directory of Open Access Journals (Sweden)

    Deng-hong CHEN

    2011-06-01

    Full Text Available There existed some limitations when analyzing the anti-sliding seismic stability of dam-foundation system by traditional pseudo-static method and response spectrum method. The dynamic strength reduction method was used to study on the deep anti-sliding stability of a high gravity dam considering complex dam foundation under strong earthquake-induced ground action. The static analysis was firstly carried out by reducing the shear strength parameters of the dam foundation’s rock mass with equal proportion. Then, the time-history seismic analysis was carried out based on the static analysis. It was proposed as one of dynamic instability criterions that the peak values of the dynamic displacements and plastic strain energy change suddenly with increasing strength reduction coefficient. The elasto-plastic behavior of the dam foundation was idealized using Drucker–Prager yield criterion based on associated flow rule assumption. Through the static, dynamic strength reduction analysis and dynamic linear elastic analysis of the overflow dam monolith of a high gravity dam, the results’ reliability of elastic-plastic time history analysis was confirmed. The results also showed that the rock mass strength of the high gravity dam foundation has higher strength reserve coefficient. The instability criterions of dynamic strength reduction method proposed were feasible. Although the static anti-slide analysis methods and standards of gravity dam based on the numerical methods are being discussed at present, the dynamic calculation method and instability criterions proposed in this paper would provide some meaningful suggestions for the dynamic analysis of the similar projects.

  6. Optimizing the dammed: water supply losses and fish habitat gains from dam removal in California.

    Science.gov (United States)

    Null, Sarah E; Medellín-Azuara, Josué; Escriva-Bou, Alvar; Lent, Michelle; Lund, Jay R

    2014-04-01

    Dams provide water supply, flood protection, and hydropower generation benefits, but also harm native species by altering the natural flow regime and degrading aquatic and riparian habitat. Restoring some rivers reaches to free-flowing conditions may restore substantial environmental benefits, but at some economic cost. This study uses a systems analysis approach to preliminarily evaluate removing rim dams in California's Central Valley to highlight promising habitat and unpromising economic use tradeoffs for water supply and hydropower. CALVIN, an economic-engineering optimization model, is used to evaluate water storage and scarcity from removing dams. A warm and dry climate model for a 30-year period centered at 2085, and a population growth scenario for year 2050 water demands represent future conditions. Tradeoffs between hydropower generation and water scarcity to urban, agricultural, and instream flow requirements were compared with additional river kilometers of habitat accessible to anadromous fish species following dam removal. Results show that existing infrastructure is most beneficial if operated as a system (ignoring many current institutional constraints). Removing all rim dams is not beneficial for California, but a subset of existing dams are potentially promising candidates for removal from an optimized water supply and free-flowing river perspective. Removing individual dams decreases statewide delivered water by 0-2282 million cubic meters and provides access to 0 to 3200 km of salmonid habitat upstream of dams. The method described here can help prioritize dam removal, although more detailed, project-specific studies also are needed. Similarly, improving environmental protection can come at substantially lower economic cost, when evaluated and operated as a system.

  7. Predicting Water Levels at Kainji Dam Using Artificial Neural Networks

    African Journals Online (AJOL)

    Predicting Water Levels at Kainji Dam Using Artificial Neural Networks. ... The aim of this study is to develop artificial neural network models for predicting water levels at Kainji Dam, which supplies water to Nigeria's largest ... Article Metrics.

  8. Inventory of Dams in the State of Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Permitted dams in Iowa and associated attributes, as recorded by the Floodplain Section of the DNR. The dams regulated are those with the parameters listed below: a....

  9. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Department of Resources — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  10. Research review of the cement sand and gravel (CSG) dam

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    The cement sand and gravel (CSG) dam is a new style of dam that owes the advantages both of the concrete faced rock-fill dam (CRFD) and roller compacted concrete (RCC) gravity dam,because of which it has attracted much attention of experts home and abroad.At present,some researches on physic-mechanical property of CSG material and work behavior of CSG dam have been done.This paper introduces the development and characteristics of CSG dam systematically,and summarizes the progress of the study on basic tests,constitutive relation of CSG material and numerical analysis of CSG dam,in addition,indicates research and application aspect of the dam.

  11. Computational Aspects of Dam Risk Analysis: Findings and Challenges

    Directory of Open Access Journals (Sweden)

    Ignacio Escuder-Bueno

    2016-09-01

    Full Text Available In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on “Computational Aspects of Analysis and Design of Dams.” In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, including downstream consequence assessments and the uncertainty of structural models.

  12. Harvesting river water through small dams promote positive environmental impact.

    Science.gov (United States)

    Agoramoorthy, Govindasamy; Chaudhary, Sunita; Chinnasamy, Pennan; Hsu, Minna J

    2016-11-01

    While deliberations relating to negative consequences of large dams on the environment continue to dominate world attention, positive benefits provided by small dams, also known as check dams, go unobserved. Besides, little is known about the potential of check dams in mitigating global warming impacts due to less data availability. Small dams are usually commissioned to private contractors who do not have clear mandate from their employers to post their work online for public scrutiny. As a result, statistics on the design, cost, and materials used to build check dams are not available in public domain. However, this review paper presents data for the first time on the often ignored potential of check dams mitigating climate-induced hydrological threats. We hope that the scientific analysis presented in this paper will promote further research on check dams worldwide to better comprehend their eco-friendly significance serving society.

  13. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  14. Lac Courte Oreilles Hydro Dam Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Weaver, Jason [Lac Courte Oreilles, Hayward, WI (United States); Meyers, Amy [Kiser Hydro, LLC, Norway, MI (United States)

    2014-12-31

    The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

  15. Passage and survival probabilities of juvenile Chinook salmon at Cougar Dam, Oregon, 2012

    Science.gov (United States)

    Beeman, John W.; Evans, Scott D.; Haner, Philip V.; Hansel, Hal C.; Hansen, Amy C.; Smith, Collin D.; Sprando, Jamie M.

    2014-01-01

    This report describes studies of juvenile-salmon dam passage and apparent survival at Cougar Dam, Oregon, during two operating conditions in 2012. Cougar Dam is a 158-meter tall rock-fill dam used primarily for flood control, and passes water through a temperature control tower to either a powerhouse penstock or to a regulating outlet (RO). The temperature control tower has moveable weir gates to enable water of different elevations and temperatures to be drawn through the dam to control water temperatures downstream. A series of studies of downstream dam passage of juvenile salmonids were begun after the National Oceanic and Atmospheric Administration determined that Cougar Dam was impacting the viability of anadromous fish stocks. The primary objectives of the studies described in this report were to estimate the route-specific fish passage probabilities at the dam and to estimate the survival probabilities of fish passing through the RO. The first set of dam operating conditions, studied in November, consisted of (1) a mean reservoir elevation of 1,589 feet, (2) water entering the temperature control tower through the weir gates, (3) most water routed through the turbines during the day and through the RO during the night, and (4) mean RO gate openings of 1.2 feet during the day and 3.2 feet during the night. The second set of dam operating conditions, studied in December, consisted of (1) a mean reservoir elevation of 1,507 ft, (2) water entering the temperature control tower through the RO bypass, (3) all water passing through the RO, and (4) mean RO gate openings of 7.3 feet during the day and 7.5 feet during the night. The studies were based on juvenile Chinook salmon (Oncorhynchus tshawytscha) surgically implanted with radio transmitters and passive integrated transponder (PIT) tags. Inferences about general dam passage percentage and timing of volitional migrants were based on surface-acclimated fish released in the reservoir. Dam passage and apparent

  16. Research on Dam Perspective Based on Numerical Solution

    Institute of Scientific and Technical Information of China (English)

    WANGZi-ru; ZHOUHui-cheng; LIMing-qiu

    2005-01-01

    The numerical solution of dam toe line is solved based on the dam data and topographic map of dam located. The display of dam perspective is also realized by programming of using VC++ and OpenGL. The research results above provide the foundation of construction design, construction lofting and information inquiry, which avoids the drawbacks of only using blueprints to do the same work in the past. The method used is useful in practical engineering.

  17. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    Full Text Available Introduction: Cracking of earth dams is a one of the main threat causes of stability of embankment dams. In this research by modeling of the behavior of an embankment dam and employing conditions of the earthquake, the reasons of cracking were inspected using by modeling of earth dam behavior. Based on the literature, one of the main causes of dam failures is sliding and cracking of the dam structure during earthquake. Localized liquefaction of foundation soils was one of the causes of the observed post-earthquake distress within these dams. Material and Methods: In order to study the causes and the results of crack on earth dams, Mahmoodabad earthen dam with a height of 19 m, is located in Zanjan province, northwest of Iran, which suffered a longitudinal crack on the crest and slight sliding of the upstream slope due to 2001 Avaj earthquake was studied. This dam has faced earthquake two times with an interval of two years. During the first earthquake with the magnitude about 6.6 in Richter scale small longitudinal cracks had created on the crest. The developed cracks had been repaired by injecting the cement and then has been hidden by passing the time. After the second earthquake with the magnitude about 6.5 in Richter scale the hidden cracks had been appeared again and the slight movement of the upper slopes of dam reported. Based on the site investigation and documented information about dam, including maps and parameter data, the behavior of the dam has modeled by using Plaxis as a finite element model. In order to check the accuracy of the design of dam, the stability analysis has been conducted using by Xslope as a limit equilibrium model. The foundation conditions and the Geotechnical properties of the layer beneath the dam has been inspected by open excavation. Results and Discussion: Underground investigation about Geotechnical properties of dam foundation has showed that there is a thin sandy layer confined in alluvium material of the

  18. Major dams of the United States, Geographic NAD83, USGS (2006) [dams00x020_USGS_2006

    Data.gov (United States)

    Louisiana Geographic Information Center — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  19. 43 CFR 418.18 - Diversions at Derby Dam.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Diversions at Derby Dam. 418.18 Section... Operations and Management § 418.18 Diversions at Derby Dam. (a) Diversions of Truckee River water at Derby Dam must be managed to maintain minimum terminal flow to Lahontan Reservoir or the Carson River...

  20. 25 CFR 173.16 - Reserved area, Coolidge Dam.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Reserved area, Coolidge Dam. 173.16 Section 173.16... area, Coolidge Dam. No permit for any commercial business or other activity (except boating concessions...-fourths of a mile from the center of the Coolidge Dam, Arizona....

  1. 21 CFR 872.6300 - Rubber dam and accessories.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Rubber dam and accessories. 872.6300 Section 872...) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6300 Rubber dam and accessories. (a) Identification. A rubber dam and accessories is a device composed of a thin sheet of latex with a hole in...

  2. SEISMIC RESPONSE OF DAM WITH SOIL-STRUCTURE INTERACTION.

    Science.gov (United States)

    Bycroft, G.N.; Mork, P.N.

    1987-01-01

    An analytical solution to the response of a long trapezoidal-section dam on a foundation consisting of an elastic half-space and subjected to simulated earthquake motion is developed. An optimum seismic design is achieved when the cross section of the dam is triangular. The effect of soil structure interaction is to lower the strain occurring in the dam.

  3. Flaxseed bioactive compounds change milk, hormonal and biochemical parameters of dams and offspring during lactation.

    Science.gov (United States)

    Troina, A A; Figueiredo, M S; Passos, M C F; Reis, A M; Oliveira, E; Lisboa, P C; Moura, E G

    2012-07-01

    We evaluated maternal intake of SDG (secoisolariciresinol diglucoside), a compound from flaxseed, and flaxseed oil+SDG on biochemical and hormonal parameters of dams and male and female offspring during lactation. Dams were fed a standard diet (C); diet added 40 mg of SDG/100g diet (SDG) or diet added 40 mg of SDG/100g diet and 7% of flaxseed oil (OLSDG). SDG and OLSDG dams showed hyperprolactinemia. The OLSDG milk had lower lactose and protein, while the SDG milk had lower protein on the 14th day of lactation. At 14 days, OLSDG male and female pups showed lower body mass, SDG and OLSDG male pups had hypoprolactinemia and lower body fat mass, but higher visceral fat mass (VFM) and hypertriglyceridemia. At 21 days, male SDG and OLSDG presented hypotriglyceridemia. At 14 days, SDG and OLSDG female offspring showed higher serum 17-β estradiol (E2); OLSDG presented hypercholesterolemia and SDG presented hypertriglyceridemia. At 21 days, SDG and OLSDG female pups showed hypotriglyceridemia and OLSDG shower lower E2. Both maternal treatments changes maternal metabolism as well as hormonal and biochemical parameters of the offspring, which are gender-dependent. Maternal hyperprolactinemia may act as an imprint factor responsible for the hormonal and metabolic changes observed in the pups.

  4. Interim results from a study of the behavior of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March--August 2011

    Science.gov (United States)

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.

    2012-01-01

    The movements and dam passage of yearling juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. A total of 411 hatchery fish and 26 wild fish were tagged and released between March 7 and May 21, 2011. A series of 16 autonomous hydrophones placed throughout the reservoir were used to determine general fish movements over the life of the acoustic transmitter, which was expected to be 91 days. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back. The dam passage rate was 11.2 percent (95-percent confidence interval 7.8–14.6 percent) for hatchery fish and 15.4 percent (95-percent confidence interval -1.0–31.8 percent) for wild fish within 91 days from release. Most fish passage occurred at night. The median time from release to dam passage was 34.5 days for hatchery fish and 34.2 days for wild fish. A system of hydrophones near the dam outlet, a temperature control tower, was used to estimate positions of fish in three dimensions to enable detailed analyses of fish behavior near the tower. Analyses of these data indicate that hourly averaged depths of fish within a distance of 74 m from the upstream face of the tower ranged from 0.6 to 9.6 meters, with a median depth of 3.6 meters for hatchery fish and 3.4 meters for wild fish. Dam discharge rates and the diurnal period affected the rates of dam passage. Rates of dam passage were similar when the dam discharge rate was less than 1,200 cubic feet per second, but increased sharply at higher discharges. The rate of dam passage at night was 4.4–7.8 times greater than during the day, depending on the distance of fish from the dam. This report is an interim summary of data collected as of August 3, 2011, for planning purposes.

  5. Postpartum behavioral profiles in Wistar rats following maternal separation - altered exploration and risk-assessment behavior in MS15 dams

    Directory of Open Access Journals (Sweden)

    Loudin Daoura

    2010-06-01

    Full Text Available The rodent maternal separation (MS model is frequently used to investigate the impact of early environmental factors on adult neurobiology and behavior. The majority of MS studies assess effects in the offspring and few address the consequences of repeated pup removal in the dam. Such studies are of interest since alterations detected in offspring subjected to MS may, at least in part, be mediated by variations in maternal behavior and the amount of maternal care provided by the dam. The aim of this study was to investigate how daily short (15 min; MS15 and prolonged (360 min; MS360 periods of MS affects the dam by examining postpartum behavioral profiles using the multivariate concentric square field™ (MCSF test. The dams were tested on postpartum days 24-25, i.e. just after the end of the separation period and weaning. The results reveal a lower exploratory drive and lower risk-assessment behavior in MS15 dams relative to MS360 or animal facility reared dams. The present results contrast some of the previously reported findings and provide new information about early post-weaning behavioral characteristics in a multivariate setting. Plausible explanations for the results are provided including a discussion how the present results fit into the maternal mediation hypothesis.

  6. Dams life. Dams in operation; La vie des barrages. Barrages en exploitation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This paper summarizes the conclusions of the annual inspections of French dams in operation (fissures, water oozing, concrete swelling etc..). Only the observations which require a special attention are reported. (J.S.)

  7. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  8. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... result from encountering unanticipated or unusual conditions during construction. (5) The independent review of construction shall include: (i) Foundation preparation and treatment. When the foundation has... construction. The reviewer must have demonstrated experience in the design and construction of dams of...

  9. Aquifer performance under the Mactaquac Dam

    Energy Technology Data Exchange (ETDEWEB)

    Tawil, A.H. [Acres International, Niagara Falls, ON (Canada); Harriman, F.B. [New Brunswick Power, Fredericton, NB (Canada)

    2001-10-01

    The highest dam in the whole of the Maritimes and New Brunswick in particular is the Mactaquac Dam, with a height of 58 m above the foundation. It forms an integral part of the Mactaquac Hydroelectric Development and the construction of the dam was completed in 1967. Composed of a central core of clay till and external shells of rockfill, it is a zoned embankment. The high artesian pressure rising 6 m above the Saint John River dominates, and the foundation under the dam is composed of a stratum of stiff glacial till underlain with a thick, water bearing aquifer. The aquifer needed to be depressurized during the construction phase and in the long term, and special measures were required to accomplish this. Measurements obtained over a period exceeding 30 years were used to describe the performance of the aquifer, which is discussed in this presentation. A continuous reduction in the yield from the six permanent relief wells in the aquifer was indicated by the instrumentation data. The outflow from the wells diminished by two-thirds over the thirty-four years since first filling the reservoir. The piezometric pressure in the aquifer remained constant over the same period. The sparse results of a two-hour pump test had formed the basis for the design decision not to install a costly foundation seepage cut-off to bedrock, as the conclusions drawn from the pump test were that the aquifer was hydrogeologically confined. 3 refs., 4 tabs., 9 figs.

  10. Increasing dam safety with multi beam sonar

    Energy Technology Data Exchange (ETDEWEB)

    Bartsch, M. [SwedPower AB, Stockholm (Sweden); Cederstrom, M.O. [Vattenfall AB, Stockholm (Sweden); Deborg, J. [SwedPower AB, Alvkarleby (Sweden)

    2004-09-01

    Multi-beam sonar technology has been introduced to Vattenfall's dam safety program. Vattenfall is the major energy producer in Sweden and the third largest utility in Europe. Embankment dams are subject to processes such as erosion, settlement and sinkholes. The new portable multi-beam echo sounder system is an important tool to detect minor damages and to intervene before they evolve into expensive or hazardous situations. A first survey of the upstream slope of a rockfill dam with this method provides a topographic map indicating the location of anomalies such as internal erosion or piping. Multi-beam sonar works by combining GPS-RTK positioning, gyro motion sensing, a multi-beam sonar and 3-dimensional digital terrain programs. Vattenfall is using the system to verify and monitor all high hazard rockfill dams in Sweden to ensure long-term stability. The data will be stored as a fingerprint for comparison with future surveys in 15 to 20 years as part of routine safety evaluation. This new technology can also be used to survey breakwaters, erosion of rivers and to locate submerged debris in harbours. 6 figs.

  11. A Final Test for the Big Dam

    Institute of Scientific and Technical Information of China (English)

    LI LI

    2010-01-01

    @@ The water level at the Three Gorges Dam,the world's largest water control and utilization project,reached its designed highest mark on October 26,which will enable the project to fulfill its functions of flood control,power generation,navigation and water diversion.

  12. Will We. . .? Thai Dam Resource Book.

    Science.gov (United States)

    Murphy, Richard, Ed.; And Others

    This resource book is intended as an aid to persons working with Thai Dam refugees. To help the language teacher, some differences between Lao and English are discussed, specifically tonal inflections, positioning, declension of pronouns, conjugation of verbs, interrogatives, classifiers and predicate adjectives. An outline of cultural differences…

  13. Resilience scales of a dammed tropical river

    Science.gov (United States)

    Calamita, Elisa; Schmid, Martin; Wehrli, Bernhard

    2017-04-01

    Artificial river impoundments disrupt the seasonality and dynamics of thermal, chemical, morphological and ecological regimes in river systems. These alterations affect the aquatic ecosystems in space and time and specifically modify the seasonality and the longitudinal gradients of important biogeochemical processes. Resilience of river systems to anthropogenic stressors enables their recovery along the flow path; however little is known about the longitudinal distance that rivers need to partially restore their physical, chemical and biological integrity. In this study, the concept of a "resilience scale" will be explored for different water quality parameters downstream of Kariba dam, the largest artificial lake in the Zambezi basin (South-East Africa). The goal of this project is to develop a modelling framework to investigate and quantify the impact of large dams on downstream water quality in tropical context. In particular, we aim to assess the degree of reversibility of the main downstream alterations (temperature, oxygen, nutrients) and consequently the quantification of their longitudinal extent. Coupling in-situ measurements with hydraulic and hydrological parameters such as travel times, will allow us to define a physically-based parametrization of the different resilience scales for tropical rivers. The results will be used for improving future dam management at the local scale and assessing the ecological impact of planned dams at the catchment scale.

  14. Fish reproductive guilds downstream of dams.

    Science.gov (United States)

    Vasconcelos, L P; Alves, D C; Gomes, L C

    2014-11-01

    Fish reproductive guilds were used to evaluate the responses of species with different reproductive strategies during two different periods of post-dam construction. The data used for the comparisons were collected in the upper Paraná River floodplain (Brazil), downstream of the Porto Primavera dam, 2 and 10 years after impoundment. The abundance (catch per unit effort, CPUE), species richness, evenness and structure of communities, all within reproductive guilds, were used to test the hypothesis that these metrics vary spatially and temporally. The influence of damming on species structure and the diversity of fish reproductive guilds varied spatiotemporally, and species with opportunistic reproductive strategies tended to be less affected. Conversely, long-distance migratory species responded more markedly to spatiotemporal variations, indicating that the ecosystem dynamics exert greater effects on populations of these species. Thus, the effects of a dam, even if attenuated, may extend over several years, especially downstream. This finding emphasizes the importance of maintaining large undammed tributaries downstream of reservoirs.

  15. Modelling approach for gravity dam break analysis

    Directory of Open Access Journals (Sweden)

    Boussekine Mourad

    2016-09-01

    Full Text Available The construction of dams in rivers can provide considerable benefits such as the supply of drinking and irrigation water; however the consequences which would result in the event of their failure could be catastrophic. They vary dramatically depending on the extent of the inundation area, the size of the population at risk.

  16. Experimental research on the dam-break mechanisms of the Jiadanwan landslide dam triggered by the Wenchuan earthquake in China.

    Science.gov (United States)

    Xu, Fu-gang; Yang, Xing-guo; Zhou, Jia-wen; Hao, Ming-hui

    2013-01-01

    Dam breaks of landslide dams are always accompanied by large numbers of casualties, a large loss of property, and negative influences on the downstream ecology and environment. This study uses the Jiadanwan landslide dam, created by the Wenchuan earthquake, as a case study example. Several laboratory experiments are carried out to analyse the dam-break mechanism of the landslide dam. The different factors that impact the dam-break process include upstream flow, the boulder effect, dam size, and channel discharge. The development of the discharge channel and the failure of the landslide dam are monitored by digital video and still cameras. Experimental results show that the upstream inflow and the dam size are the main factors that impact the dam-break process. An excavated discharge channel, especially a trapezoidal discharge channel, has a positive effect on reducing peak flow. The depth of the discharge channel also has a significant impact on the dam-break process. The experimental results are significant for landslide dam management and flood disaster prevention and mitigation.

  17. Expectations of immortality: dam safety management into the next millennium

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, M.D. [Tonkin and Taylor International Ltd., Auckland, (New Zealand)

    1999-07-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs.

  18. Socioeconomic and Institutional Dimensions of Dam Removals: The Wisconsin Experience

    Science.gov (United States)

    Born; Genskow; Filbert; Hernandez-Mora; Keefer; White

    1998-05-01

    / There are tens of thousands of small dams in the United States; many of these aging structures are deteriorating. Governments and dam owners face decisions regarding repair or removal of these structures. Along with the many benefits society derives from dams and their impoundments, numerous recent ecological studies are revealing the extensive alteration and degradation of river ecosystems by dams. Dam removal-a principal restoration strategy-is an infrequent event. The major reasons for removal have been public safety and the high costs associated with repair; the goal of river ecosystem restoration now warrants greater attention. Substantial study is being given to the environmental aspects of dams and dam removals, but very little attention has been given to the socioeconomic and institutional dimensions associated with the removal of dams, although these factors play a significant role in the removal decision-making process. Based on a case study of dam removals in Wisconsin-where more than 30 of the state's 3600 small dams have been removed in the past few decades-legal, financial, and socioeconomic issues associated with dam removal are documented and assessed. Dam removal has been complex and contentious, with limited community-based support for removal and loss of the impounded waters. In cases examined here, the estimated costs of repairing a dam averaged more than three times the cost of removal. The availability of governmental financing has been a key determinant in removal decisions. Watershed-scale ecological considerations are not major factors for most local interests. As watershed management and restoration increasingly include dam removal options as part of an integrated strategy, more attention will need to be focused on socioeconomic factors and stakeholder perspectives-variables that strongly influence the viability of this management alternative.KEY WORDS: Dam removal; River restoration; Institutions; Stakeholders

  19. River restoration by dam removal: Enhancing connectivity at watershed scales

    Directory of Open Access Journals (Sweden)

    F.J. Magilligan

    2016-05-01

    Full Text Available Abstract The prolonged history of industrialization, flood control, and hydropower production has led to the construction of 80,000 dams across the U.S. generating significant hydrologic, ecological, and social adjustments. With the increased ecological attention on re-establishing riverine connectivity, dam removal is becoming an important part of large-scale river restoration nationally, especially in New England, due to its early European settlement and history of waterpower-based industry. To capture the broader dimensions of dam removal, we constructed a GIS database of all inventoried dams in New England irrespective of size and reservoir volume to document the magnitude of fragmentation. We compared the characteristics of these existing dams to the attributes of all removed dams over the last ∼25 years. Our results reveal that the National Inventory of Dams significantly underestimates the actual number of dams (4,000 compared to >14,000. To combat the effects of these ecological barriers, dam removal in New England has been robust with 127 dams having been removed between ca. 1990–2013. These removed dams range in size, with the largest number (30% ranging between 2–4 m high, but 22% of the removed dams were between 4–6 m. They are not isolated to small drainage basins: most drained watersheds between 100–1,000 km2. Regionally, dam removal has re-connected ∼3% (3,770 river km of the regional river network although primarily through a few select dams where abundant barrier-free river lengths occur, suggesting that a more strategic removal approach has the opportunity to enhance the magnitude and rate of river re-connection. Given the regional-scale restoration of forest cover and water quality over the past century, dam removal offers a significant opportunity to capitalize on these efforts, providing watershed scale restoration and enhancing watershed resilience in the face of significant regional and global anthropogenic

  20. Status and Habitat Requirements of the White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1990-1991 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1991-09-01

    We report on our effort from April 1990 to March 1991 to describe the life history and population dynamics of white sturgeon Acipenser transmontanus in.John Day Reservoir. We set 1188 set lines and 26 gill nets. We caught 623 white sturgeon with set lines and 236 with gill nets. Catch per unit effort was much higher in areas near the tailrace than in downstream sites. Our setlines were size selective. We recaptured 3 fish released in John Day Reservoir in 1989 and 28 fish released in 1990. Sport and commercial fishermen recovered 62 tags from fish we tagged in Bonneville, The Dalles and John Day reservoirs, 1987-1990. We observed extensive movements of marked sturgeon within the reservoirs. We completed aging of available samples from all three reservoirs from 1987-1990. We aged fish as old as 46 years. Bone marks were observed on 74 of 78 fish previously injected with oxytetracycline and annulus formation was generally complete after June. We estimated parameters in a length-weight equation. About 1.5% of the female white sturgeon we examined to date had early or late vitellogenic eggs and would be expected to spawn the following year.

  1. RESEARCH ON SEEPAGE MONITORING MODEL OF EARTH-ROCK DAM

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    With the characteristics of seepage flow in earth-rock dams, a seepage monitoring model was established based on the finite element method for 3-D seepage flow together with observed data and was used to analyze and monitor the seepage of dams. In order to find out and monitor the seepage status of the whole dam, the separation of seepage amount for dam body, dam foundation and side banks was made theoretically by using the model. Practical example shows that the accuracy of computed results is satisfactory and the separation results are more objective.

  2. Feeding Activity, Rate of Consumption, Daily Ration and Prey Selection of Major Predators in the John Day Pool. 1982 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Gray, Gerard A.; United States. Bonneville Power Administration

    1984-03-01

    This study was initiated to determine the extent of predation by resident populations of native and introduced fish on juvenile salmonids in main stem Columbia River Reservoirs. The John Day Reservoir and tailrace was selected as the study area. First year objectives were: (1) determine whether native and introduced predators preyed on juvenile salmonids; (2) determine which species were major predators; and (3) locate areas where predation was most intense. Results indicated that juvenile salmonids were consumed by all four predatory fish species studied: northern squawfish (Ptychocheilus oregonensis), walleye (Stizostedion vitreum vitreum), smallmouth bass (Micropterus dolomieu), and channel catfish (Ictalurus punctatus). However, degree of predation varied among predators as a function of spatial distribution, apparent abundance, size, and temporal feeding behavior. 15 figs., 16 tabs.

  3. Mining dams safety regulations : where does Canada stand?

    Energy Technology Data Exchange (ETDEWEB)

    Priscu, C. [AMEC, Winnipeg, MB (Canada); Small, A. [AMEC Earth and Environmental Ltd., Fredericton, NB (Canada); Lupo, J. [AMEC, Englewood, CO (United States); Diaz, M. [AMEC, Ashford, Kent (United Kingdom); Davies, M. [AMEC, Vancouver, BC (Canada); Musse, M. [AMEC, Santiago (Chile)

    2009-07-01

    While many jurisdictions in Canada use the Canadian Dam Association (CDA) dam safety guidelines, their applicability to the safety of mining dams is limited. Mining dams are some of the largest containment structures in the world, and impound millions of cubic meters of mine process residues in both solid and liquid form. This study presented a review of dam safety regulatory frameworks for mining dams located in various countries. The aim of the study was to compare the Canadian framework with various dam safety legislations in order to evaluate Canada's current status and recommend best practices in dam safety regulations. The study reviewed incremental consequence classifications; best practices in operation, surveillance and maintenance manuals and procedures; emergency preparedness plans; and dam safety inspections. The study showed that Canada has limited documentation regulating the safe management of tailings facilities, and does not have an all-encompassing national guideline for mining dams. It was concluded that an incremental consequence classification (ICC) system should be developed specifically for mining dams. 12 refs.

  4. Seismic failure modes and seismic safety of Hardfill dam

    Directory of Open Access Journals (Sweden)

    Kun XIONG

    2013-04-01

    Full Text Available Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  5. Triclosan exposure reduces thyroxine levels in pregnant and lactating rat dams and in directly exposed offspring.

    Science.gov (United States)

    Axelstad, Marta; Boberg, Julie; Vinggaard, Anne Marie; Christiansen, Sofie; Hass, Ulla

    2013-09-01

    Thyroid disrupting chemicals can potentially disrupt brain development. Two studies investigating the effect of the antibacterial compound triclosan on thyroxine (T₄) levels in rats are reported. In the first, Wistar rat dams were gavaged with 75, 150 or 300 mg triclosan/kg bw/day throughout gestation and lactation. Total T₄ serum levels were measured in dams and offspring, and all doses of triclosan significantly lowered T₄ in dams, but no significant effects on T₄ levels were seen in the offspring at the end of the lactation period. Since this lack of effect could be due to minimal exposure through maternal milk, a second study using direct per oral pup exposure from postnatal day 3-16 to 50 or 150 mg triclosan/kg bw/day was performed. This exposure pointed to significant T₄ reductions in 16 day old offspring in both dose groups. These results corroborate previous studies showing that in rats lactational transfer of triclosan seems limited. Since an optimal study design for testing potential developmental neurotoxicants in rats, should include exposure during both the pre- and postnatal periods of brain development, we suggest that in the case of triclosan, direct dosing of pups may be the best way to obtain that goal.

  6. Gabcikovo dam and Liptovska Mara dam - statistical analysis of measurement data

    Science.gov (United States)

    Hakac, J.; Sabo, M.

    2012-04-01

    Introduction: Water level in the observation wells is measured regularly and one of the reasons is evaluation of the safety of the water constructions. In this paper we are exploring the reliability of the measuring devices that are responsible for evaluation of the safety of the two largest and the most important dams in Slovakia. We test ability of selected statistical methods to detect early inaccuracies of measuring devices and thus improve the evaluation of the safety of the water constructions. As a follow-up study, we used the time series model (Neural network) to predict water levels in the observation wells that were considered to be without defects. Neural Network is also able to show dynamics of the filtration stability of the observational well. Methods: On the Liptovska Mara dam weekly data was used as a monitoring tool. On the Gabcikovo dam five minute time series of the measurements of the water level in observation wells around the right lock chamber were used. Data from the measuring devices of the dams were explored with boxplots, correlations, neural network, etc. The mentioned statistical tools analyze time series and detect the errors that measuring devices make when generating data and can be used to predict errors even in real time. In the second step, agreement between predicted data from neural network and measured data in the real time was evaluated. We used grid search for finding the optimal number of neurons and then predicted errors by using this model. The ability of the neural network in evaluation of the sealing of the dilatation joints on the filtration stability in the years 2009 - 2011 is presented. Results: From the 18 selected measuring devices on the Liptovska Mara dam there are only 3 devices which can be considered as reliable. On the Gabcikovo dam, 8 of 9 measuring devices (observation wells around right lock chamber) were considered as a reliable. There was very good agreement between the predicted and measured data at the

  7. Damned If You Do, Dammed If You Don't: Debates on Dam Removal in the Swedish Media

    Directory of Open Access Journals (Sweden)

    Dolly Jørgensen

    2013-03-01

    Full Text Available Dam removal is an increasingly common practice. Dams are removed for various reasons, with safety, economics, and ecosystem restoration being the most common. However, dam removals often cause controversy. Riparian land owners and local communities often have a negative view of removal, and their reasons vary. It may be the loss of recreational benefits such as swimming and boating, loss of cultural and historical context tied to the dam, or fear that removal may have a negative effect on aesthetic values. Because controversies are often picked up by local media, and media in itself is an important channel to build support around a cause, the way in which dam removals are reported and discussed in the media is likely to influence the debate. Here, we examine the ways in which proponents and opponents of dam removal frame the services provided by two contrasting ecosystems, i.e., an existing dam and the potential stream without a dam, by performing a media discourse analysis of the reasons given for removal and the reasons presented for the dam to remain in place. Our source material includes Internet-based newspaper articles and their associated public comments in four dam removal controversies in Sweden. Our analysis indicates that public opposition is not based on knowledge deficiency, where more information will lead to better ecological decision-making, as is sometimes argued in dam removal science; it is instead a case of different understandings and valuation of the environment and the functions it provides.

  8. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    Science.gov (United States)

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs.

  9. GIS inundation mapping and dam breach analysis of Woolwich Dam using HEC-geoRAS

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada); Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-07-01

    A study was conducted to determine the extent of flood inundation given a hypothetical dam breach scenario of the Woolwich Dam located in the Grand River Watershed, 2.5 km north of the Town of Elmira, Ontario. The dam is operated by the Grand River Conservation Authority and was constructed to provide low-flow augmentation to Canagagigue Creek. Advances in the computational capabilities of numerical models along with the availability of fine resolution geospatial data has lead to significant advances in the evaluation of catastrophic consequences due to the ensuing flood waters when dams fail. The hydraulic models HEC-RAS and HEC-GeoRAS were used in this study along with GIS to produce high resolution spatial and temporal flood inundation mapping. Given the proximity to the Town of Elmira, the dam is classified as having a high hazard potential. The large size and high hazard potential of the dam suggests that the Inflow Design Flood (IDF) is the Probable Maximum Flood (PMF) event. The outlet structure of the spillway consists of 4 ogee-type concrete spillways equipped with radial gates. A low-level concrete pipe located within the spillway structure provides spillage for maintenance purposes. The full flow capacity of the spillway structure is 297 cubic metres per second at the full supply level of 364.8 metres. In addition to GIS flood inundation maps, this paper included the results of flood hydrographs, water surface profiles and peak flow data. It was concluded that techniques used in this analysis should be considered for use in the development of emergency management planning and dam safety assessments across Canada. 6 refs., 3 tabs., 4 figs.

  10. National Dam Inspection Program. Lake Housatonic Dam and Dike (CT 00026 and CT 01714). Connecticut Coastal Basin, Housatonic River, Derby-Shelton, Connecticut. Phase I Inspection Report.

    Science.gov (United States)

    1981-08-01

    8217;’,.-+-.-. ""’"" . .•• "•;. - NATIONAL DAM INSPECTION PROGRAM PHASE I INSPECTION REPORT Identification No.: CT 00026, CT 01714 N *~ Name of Dam: Lake Housatonic Dam and Dike " Town...approach was used between 1868 and 1870 to strengthen the Holyoke dam. The dam that existed there at the time was a timber crib dam, 1,017 feet long and 30

  11. To what extent do long-duration high-volume dam releases influence river–aquifer interactions? A case study in New South Wales, Australia

    KAUST Repository

    Graham, Peter W.

    2014-11-20

    Long-duration high-volume dam releases are unique anthropogenic events with no naturally occurring equivalents. The impact from such dam releases on a downstream Quaternary alluvial aquifer in New South Wales, Australia, is assessed. It is observed that long-duration (>26 days), high-volume dam releases (>8,000 ML/day average) result in significant variations in river–aquifer interactions. These variations include a flux from the river to the aquifer up to 6.3 m3/day per metre of bank (at distances of up to 330 m from the river bank), increased extent and volume of recharge/bank storage, and a long-term (>100 days) reversal of river–aquifer fluxes. In contrast, during lower-volume events (<2,000 ML/day average) the flux was directed from the aquifer to the river at rates of up to 1.6 m3/day per metre of bank. A groundwater-head prediction model was constructed and river–aquifer fluxes were calculated; however, predicted fluxes from this method showed poor correlation to fluxes calculated using actual groundwater heads. Long-duration high-volume dam releases have the potential to skew estimates of long-term aquifer resources and detrimentally alter the chemical and physical properties of phreatic aquifers flanking the river. The findings have ramifications for improved integrated management of dam systems and downstream aquifers.

  12. How Big of an Effect Do Small Dams Have? Using Geomorphological Footprints to Quantify Spatial Impact of Low-Head Dams and Identify Patterns of Across-Dam Variation.

    Science.gov (United States)

    Fencl, Jane S; Mather, Martha E; Costigan, Katie H; Daniels, Melinda D

    2015-01-01

    Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (dams on geomorphology and ecology are largely untested. Progress for research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0-15.3 km) or 287 wetted widths (136-437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.

  13. Landfill liners from dam reservoir sediments

    Directory of Open Access Journals (Sweden)

    Koś Karolina

    2016-03-01

    Full Text Available Landfill liners from dam reservoir sediments. Every municipal solid waste landfill has to be properly secured to protect the natural environment from possible leachate. Most often an artificial sealing is used, which is based on a soil liner from cohesive soils (clays, silts. Usability evaluation of bottom sediments from Rzeszowski Reservoir for building these liners was presented in the paper. Sediments from dam reservoirs, gathered as a result of the siltation process, can be a valuable material for earthworks purposes. Determination of their possible ways of usage is important, especially before the planned dredging, because thanks to that this material will not be put on a heap. Based on the analysis of the geotechnical parameters of these sediments it was stated that this material can be preliminary allowed for using in liners.

  14. Augmented Reality to Access Dam Cracks Information

    Directory of Open Access Journals (Sweden)

    Fabiana Frata Furlan Peres

    2016-03-01

    Full Text Available Augmented reality technology is a tool with great potential for application in several areas, including engineering. During the early phases of the enterprise life cycle, as design and construction, augmented reality has been widely used. Concrete dams, during operation and maintenance phase, require regular inspections as part of the necessary activities to keep their structural safety. Cracks are common pathology in these structures that must be detected, mapped and measured as their evolution may evidence structure compromising, need for maintenance or intervention. In this context this paper aims to present a prototype to access in situ the dam cracks information through the use of augmented reality, thus giving a contribution to the effectiveness and efficiency of inspections

  15. Temporal and spatial distribution of dam failure events in China

    Institute of Scientific and Technical Information of China (English)

    X.Y.HE; Z.Y.WANG; J.C.HUANG

    2008-01-01

    Reservoirs play a vital role in economic development and flood control.Nevertheless,both human and natural factors may lead to dam failures with catastrophic consequences.Analyzing the data of dam failure events from 1954 to 2003 and using the method of energy spectrum analysis,this paper studies the periodicity of dam failures.The rate of failure of different dam ages is analyzed.The climate is the main factor affecting the rate of dam failure.Climate diagrams are used to analyze the spatial distribution of dam failure events in China.High rate of dam failure occurs with 25-year and 12.5-year periods.The distribution of the percentage of dam failure shows an L-shape as a function of service age.The first 5 years of operation is known as the "infant period",during which,the probability of dam failure is much higher than during any other periods.The failure rate in areas near or north to the 400 mm annual isopluvial line is notably higher than other areas.In areas with high temperature difference among seasons have a high annual average dam failure rate.

  16. Crack status analysis for concrete dams based on measured entropy

    Institute of Scientific and Technical Information of China (English)

    WU BangBin; WU ZhongRu; CHEN Bo; SU HuaiZhi; BAO TengFei; WANG ShaoWei

    2016-01-01

    The integrity and safety of concrete dams are seriously affected by the existing cracks in dam bodies,and some serious cracks may cause dam failure or disaster.The propagation of cracks in concrete dams is accompanied by changes in energy distribution,which can be represented by changes in the structure's system entropy.Therefore,the entropy theory can be used in analyzing the behavior of dam cracks.Due to the randomness and locality of crack propagation,it is difficult to predict the location of cracks by traditional monitoring methods.To solve this problem,the influence of spatial positions of monitoring points on inspection zones is represented by a weight index,and the weight index is determined by the distance measure method proposed in this paper.Through the weighted linear fusion method,the entropy of multiple monitoring points is obtained for analyzing the behavior of dam cracks in the selected zones.Meanwhile,the catastrophe theory is used as the variation criterion of an entropy sequence in order to predict the instability time of dam cracks.Case studies are put forward on a high arch dam,and the fusion entropy is calculated according to the monitoring data from strain gauges.Results show that the proposed method can effectively predict the occurrence time and location of dam cracks regardless of the layout of monitoring instruments,and it is a new way to analyze the occurrence and propagation of dam cracks.

  17. Dam removal increases American eel abundance in distant headwater streams

    Science.gov (United States)

    Hitt, Nathaniel P.; Eyler, Sheila; Wofford, John E.B.

    2012-01-01

    American eel Anguilla rostrata abundances have undergone significant declines over the last 50 years, and migration barriers have been recognized as a contributing cause. We evaluated eel abundances in headwater streams of Shenandoah National Park, Virginia, to compare sites before and after the removal of a large downstream dam in 2004 (Embrey Dam, Rappahannock River). Eel abundances in headwater streams increased significantly after the removal of Embrey Dam. Observed eel abundances after dam removal exceeded predictions derived from autoregressive models parameterized with data prior to dam removal. Mann–Kendall analyses also revealed consistent increases in eel abundances from 2004 to 2010 but inconsistent temporal trends before dam removal. Increasing eel numbers could not be attributed to changes in local physical habitat (i.e., mean stream depth or substrate size) or regional population dynamics (i.e., abundances in Maryland streams or Virginia estuaries). Dam removal was associated with decreasing minimum eel lengths in headwater streams, suggesting that the dam previously impeded migration of many small-bodied individuals (dams may influence eel abundances in headwater streams up to 150 river kilometers distant, and that dam removal may provide benefits for eel management and conservation at the landscape scale.

  18. Will Dam Removal Increase Nitrogen Flux to Estuaries?

    Directory of Open Access Journals (Sweden)

    Arthur J. Gold

    2016-11-01

    Full Text Available To advance the science of dam removal, analyses of functions and benefits need to be linked to individual dam attributes and effects on downstream receiving waters. We examined 7550 dams in the New England (USA region for possible tradeoffs associated with dam removal. Dam removal often generates improvements for safety or migratory fish passage but might increase nitrogen (N flux and eutrophication in coastal watersheds. We estimated N loading and removal with algorithms using geospatial data on land use, stream flow and hydrography. We focused on dams with reservoirs that increase retention time at specific points of river reaches, creating localized hotspots of elevated N removal. Approximately 2200 dams with reservoirs had potential benefits for N removal based on N loading, retention time and depth. Across stream orders, safety concerns on these N removal dams ranged between 28% and 44%. First order streams constituted the majority of N removal dams (70%, but only 3% of those were classified as high value for fish passage. In cases where dam removal might eliminate N removal function from a particular reservoir, site-specific analyses are warranted to improve N delivery estimates and examine alternatives that retain the reservoir while enhancing fish passage and safety.

  19. Impulsive force of debris flow on a curved dam

    Institute of Scientific and Technical Information of China (English)

    Chjeng-Lun SHIEH; Chia-Hsien TING; Hung-Wen PAN

    2008-01-01

    Although Sabo dams are an efficient method for river and basin management,traditional Sabo dams have a great impact on ecology and landscape.Moreover,such dams are hit and often damaged by great impulsive force when they block the debris flow.Therefore,alternative shapes for Sabo dam deserve thorough investigation.In this investigation,a curved dam was designed by changing the upstream-dam-surface geometric shape to reduce the impulsive force of the debris flow,with enhanced stability and reduced concrete mass being the anticipated outcomes.In this study,the flume and laboratory facilities simulated the impulsive force of the debris flow to the Sabo dams.Three geometric forms,including vertical,slanted and curved Sabo dams,were used to determine the impulsive force.Impulsive force theories of the debris flow were derived from the momentum equation and the Bernoulli equation.In these,the impulsive force was balanced by the friction force of the Sabo dam and the opposite force of the load cell behind the dam as it was hit by the debris flow.Positive correlations were found when comparing the experimental data with the theoretical results.These findings suggest that our impulsive force theory has predictive validity with regard to the experimental data.The results from both theory and experimental data clearly show that curved dams were sustained less force than the other dams under the same debris flow.This comparison demonstrates the importance of curved geometry for a well-designed Sabo dam.

  20. A climate impact of dam lake and Recep Yazicioglu Gokpinar dam lake sample

    Directory of Open Access Journals (Sweden)

    Ülker Güner BACANLI

    2016-06-01

    Full Text Available Dams have both positive and negative effects on the environment. The most important effect can be defined as the regional climate change. In this study, the impact on Denizli city climate of Vali Recep Yazıcıoğlu Gökpınar Dam Lake was determined. In this study, Denizli city meteorological station (maximum, minimum and mean temperatures, total precipitation and wind speed data were used. Before and after from the dam construction; absolute changes are examined. After the dam construction; maximum, minimum and average temperature increase was observed in all months. A rainfall was observed to be increased in January, February and October on after dam construction, but another times was observed to be decreased. The evaporation and wind speed parameter has been little change. Linear regression, the Mann-Kendall and Sen’s Method for trend analysis were used. All techniques considered here consistently reveal that there are upward trend in maximum, minimum and mean temperatures, wind speed, no trend in precipitation and evaporation.

  1. Water temperature effects from simulated dam operations and structures in the Middle Fork Willamette River, western Oregon

    Science.gov (United States)

    Buccola, Norman L.; Turner, Daniel F.; Rounds, Stewart A.

    2016-09-14

    to the following conclusions:The existing outlets at Lookout Point Dam, because of the range of depths, allow for greater temperature control than the two existing outlets at Hills Creek Dam that are relatively deep.Temperature control at HCR through operational scenarios generally was minimal near Hills Creek Dam, but improved downstream toward the head of LOP when decreased release rates held HCR at a low lake elevation year-round.Inflows from unregulated streams between HCR and LOP helped to dilute the effects of HCR and achieve more natural stream temperatures before the MFWR entered LOP.The relative benefit of any particular scenario depended on the location in the MFWR system used to assess the potential change, with most scenarios involving changes to Hills Creek Dam being less effective with increasing downstream distance, such as downstream of DEX.To achieve as much temperature control as the most successful structural scenarios, which were able to resemble without-dam conditions for part of the year, most operational scenarios had to be free of any power-generation requirements at Lookout Point Dam.Downstream of DEX, scenarios incorporating a hypothetical floating outlet at either HCR or LOP resulted in similar temperatures, with both scenarios causing a delay in the estimated spring Chinook egg emergence by about 9–10 days compared to base-case temperature-management scenarios.

  2. Seismic performance evaluation of concrete gravity dams

    Energy Technology Data Exchange (ETDEWEB)

    Yamaguchi, Y.; Sasaki, T.; Kanenawa, K. [Public Works Research Institute, Tsukuba City (Japan); Hall, R.; Yule, D. [United States Army Engineer Research and Development Center, Vicksburg, MS (United States); Matheu, E. [Louisiana State Univ., Baton Rouge, LA (United States); Chudgar, A. [United States Army Corps of Engineers, Washington, DC (United States)

    2004-07-01

    This paper addresses technical issues related to seismic design practices and current evaluation methods in Japan and the United States. Nonlinear analysis procedures can identify the ultimate capacity of existing concrete dams, taking into account the most critical nonlinear phenomena controlling the response. A numerical model of a non-overflow monolith of Koyna Dam, subject to earthquake motion, is used as a case study to compare the different approaches for seismic evaluation of concrete gravity dams currently employed in the two countries. The complexity of nonlinear analysis procedures and the scarcity of appropriate calibration strategies force analysts to frequently interpret results using their own judgment. It was concluded that the influence of the input parameters and ground excitation on the nonlinear dynamic response should be investigated in order to identify the most critical conditions. It was also suggested that methodologies for qualitative damage estimation based on results from linear analyses could be used to develop a systematic assessment tool and reference framework for the adequate interpretation of results. 14 refs., 2 tabs., 13 figs.

  3. Simulating dam-breach flood scenarios of the Tangjiashan landslide dam induced by the Wenchuan Earthquake

    Directory of Open Access Journals (Sweden)

    X. Fan

    2012-10-01

    Full Text Available Floods from failures of landslide dams can pose a hazard to people and property downstream, which have to be rapidly assessed and mitigated in order to reduce the potential risk. The Tangjiashan landslide dam induced by the Mw = 7.9 2008 Wenchuan earthquake had impounded the largest lake in the earthquake affected area with an estimated volume of 3 × 108 m3, and the potential catastrophic dam breach posed a serious threat to more than 2.5 million people in downstream towns and Mianyang city, located 85 km downstream. Chinese authorities had to evacuate parts of the city until the Tangjiashan landslide dam was artificially breached by a spillway, and the lake was drained. We propose an integrated approach to simulate the dam-breach floods for a number of possible scenarios, to evaluate the severity of the threat to Mianyang city. Firstly, the physically-based BREACH model was applied to predict the flood hydrographs at the dam location, which were calibrated with observational data of the flood resulting from the artificial breaching. The output hydrographs from this model were inputted into the 1-D–2-D SOBEK hydrodynamic model to simulate the spatial variations in flood parameters. The simulated flood hydrograph, peak discharge and peak arrival time at the downstream towns fit the observations. Thus this approach is capable of providing reliable predictions for the decision makers to determine the mitigation plans. The sensitivity analysis of the BREACH model input parameters reveals that the average grain size, the unit weight and porosity of the dam materials are the most sensitive parameters. The variability of the dam material properties causes a large uncertainty in the estimation of the peak flood discharge and peak arrival time, but has little influence on the flood inundation area and flood depth downstream. The effect of cascading breaches of smaller dams downstream of the Tangjiashan dam was

  4. Do Hydroelectric Dams Mitigate Global Warming? The Case of Brazil's Curuna Dam

    Energy Technology Data Exchange (ETDEWEB)

    Fearnside, P.M. [National Institute for Research in the Amazon (INPA), C.P. 478, 69011-970 Manaus, Amazonas (Brazil)

    2005-10-15

    Hydroelectric dams in tropical forest areas emit greenhouse gases, as illustrated by the Curuna dam in the Amazonian portion of Brazil. Emissions include carbon dioxide from decay of the above-water portions of trees that are left standing in the reservoir and methane from soft vegetation that decays under anaerobic conditions on the bottom of the reservoir, especially macrophytes (water weeds) and vegetation that grows in the drawdown zone and is flooded when the reservoir water level rises. Some methane is released from the reservoir surface through bubbling and diffusion, but larger amounts are released from water passing through the turbines and spillway. Methane concentration in the water increases with depth, and the turbines and spillway draw water from sufficient depth to have substantial methane content. In 1990 (13 years after filling), the Curuna Dam emitted 3.6 times more greenhouse gases than would have been emitted by generating the same amount of electricity from oil.

  5. Assessment model of dam operation risk based on monitoring data

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    Although the dams produce remarkable social and economic benefits,the threat made by unsafe dams to the life and property of people who live in the lower river area is un-negligible.Based on the monitoring data which reflect the safety condition of dams,the risk degree concept is proposed and the analysis system and model for evaluating risk degree (rate) are established in this paper by combining the reliability theory and field monitoring data.The analysis method for risk degree is presented based on Bayesian approach.A five-grade risk degree system for dam operation risk and corresponding risk degree is put forward according to the safety condition of dams.The operation risks of four cascade dams on some river are analyzed by the model and approach presented here and the result is adopted by the owner.

  6. Multiple flow processes accompanying a dam-break flood in a small upland watershed, Centralia, Washington

    Science.gov (United States)

    Costa, John E.

    1994-01-01

    On October 5, 1991, following 35 consecutive days of dry weather, a 105-meter long, 37-meter wide, 5.2-meter deep concrete-lined watersupply reservoir on a hillside in the eastern edge of Centralia, Washington, suddenly failed, sending 13,250 cubic meters of water rushing down a small, steep tributary channel into the city. Two houses were destroyed, several others damaged, mud and debris were deposited in streets, on lawns, and in basements over four city blocks, and 400 people were evacuated. The cause of failure is believed to have been a sliding failure along a weak seam or joint in the siltstone bedrock beneath the reservoir, possibly triggered by increased seepage into the rock foundation through continued deterioration of concrete panel seams, and a slight rise (0.6 meters) in the pool elevation. A second adjacent reservoir containing 18,900 cubic meters of water also drained, but far more slowly, when a 41-cm diameter connecting pipe was broken by the landslide. The maximum discharge resulting from the dam-failure was about 71 cubic meters per second. A reconstructed hydrograph based on the known reservoir volume and calculated peak discharge indicates the flood duration was about 6.2 minutes. Sedimentologic evidence, high-water mark distribution, and landforms preserved in the valley floor indicate that the dam failure flood consisted of two flow phases: an initial debris flow that deposited coarse bouldery sediment along the slope-area reach as it lost volume, followed soon after by a water-flood that achieved a stage about one-half meter higher than the debris flow. The Centralia dam failure is one of three constructed dams destroyed by rapid foundation failure that defines the upper limits of an envelope curve of peak flood discharge as a function of potential energy for failed constructed dams worldwide.

  7. Foetal death in naive heifers inoculated with Neospora caninum isolate Nc-Spain7 at 110 days of pregnancy.

    Science.gov (United States)

    Almería, Sonia; Serrano-Perez, Beatriz; Darwich, Laila; Domingo, Mariano; Mur-Novales, Ramon; Regidor-Cerrillo, Javier; Cabezón, Oscar; Pérez-Maillo, Mónica; Lopez-Helguera, Irene; Fernández-Aguilar, Xavier; Puig-Ribas, Maria; Ortega-Mora, Luis Miguel; García-Ispierto, Irina; Dubey, Jitender P; López-Gatius, Fernando

    2016-09-01

    Neospora caninum infection is a leading cause of abortion in cattle worldwide. The pathogenesis of bovine neosporosis, particularly during the second term of gestation when most abortions occur in naturally infected dams, is poorly understood. In the present study foetal death was observed in 3 of 6 experimentally infected dams at 110 days of gestation after 6 weeks of experimental period. All experimental heifers were febrile between 3 and 5 days post infection (dpi). Inoculated dams seroconverted by 3-4 weeks post-infection with higher mean antibody titres in aborting dams compared to non-aborting heifers, although not significantly (p > 0.05). Neospora caninum DNA was detected in all infected foetuses and placentas, and three infected foetuses also had N. caninum antibodies. The parasite burden was higher in the brain of dead/aborted foetuses than in live foetuses. Interestingly, high IFN-γ production was detected in foetal fluids of a dead foetus found upon euthanasia of its dam, while no IFN-γ was observed in amniotic, allantoic and/or foetal fluids in the three infected foetuses that were alive upon maternal euthanasia. The present study confirms that the infection of dams on gestation day 110 with 10(7) tachyzoites of the Nc-Spain7 isolate causes abortion. The fact that some infected dams aborted and some did not is relevant to the understanding of N. caninum pathogenesis of abortion in naturally infected cows.

  8. Predicting surfacing internal erosion in moraine core dams

    OpenAIRE

    2010-01-01

    Dams that comprise broadly and widely graded glacial materials, such as moraines, have been found to be susceptible to internal erosion, perhaps more than dams of other soil types. Internal erosion washes out fine-grained particles from the filling material; the erosion occurs within the material itself or at an interface to another dam zone, depending on the mode of initiation. Whether or not internal erosion proceeds depend on the adequacy of the filter material. If internal erosion is allo...

  9. Ice-dammed lake drainage in west Greenland: Drainage pattern and implications on ice flow and bedrock motion

    DEFF Research Database (Denmark)

    Kjeldsen, Kristian Kjellerup; Khan, Shfaqat Abbas; Bjørk, Anders

    2017-01-01

    Ice-dammed lakes drain frequently in Greenland, but the impacts of these events differ between sites. Here we study the quasi-cyclic behavior of the ~40 km2 Lake Tininnilik in west Greenland and its impact on ice flow and crustal deformation. Data reveal rapid drainage of 1.83 ± 0.17 km3 of water...... in less than 7 days in 2010, leading to a speedup of the damming glacier, and an instantaneous modeled elastic bedrock uplift of 18.6 ± 0.1 mm confirmed by an independent lakeside GPS record. Since ice-dammed lakes are common on Greenland, our results highlight the importance of including other sources...... of surface loading in addition to ice mass change, when assessing glacial isostatic adjustment or elastic rebound using geodetic data. Moreover, the results illustrates a linkage between subglacial discharge and ice surface velocity, important for assessing ice flux, and thus mass balance, in a future...

  10. Environmental impacts of increased hydroelectric development at existing dams

    Energy Technology Data Exchange (ETDEWEB)

    Railsback, S. F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cada, G. F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Petrich, C. H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sale, M. J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shaakir-Ali, J. A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Watts, J. A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Webb, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1991-04-01

    This report describes the environmental impacts of a proposed U.S. Department of Energy (DOE) initiative to promote the development of hydropower resources at existing dams. Hydropower development at existing dams has, in general, fewer impacts than development of additional fossil-fueled resources or hydropower at new dams, although potential cumulative impacts of developing multiple hydropower projects have not been explicitly addressed. Environmental review of project impacts and mitigation needs can ensure that additional hydropower development at existing dams can provide a renewable resource with fewer impacts than alternative resources.

  11. Stochastic Boundary Element Analysis of Concrete Gravity Dam

    Institute of Scientific and Technical Information of China (English)

    张明; 吴清高

    2002-01-01

    Stochastic boundary integral equations for analyzing large structures are obtained from the partial derivatives of basic random variables. A stochastic boundary element method based on the equations is developed to solve engineering problems of gravity dams using random factors including material parameters of the dam body and the foundation, the water level in the upper reaches, the anti-slide friction coefficient of the dam base, etc. A numerical example shows that the stochastic boundary element method presented in this paper to calculate the reliability index of large construction projects such as a large concrete gravity dam has the advantages of less input data and more precise computational results.

  12. Dam operations affect route-specific passage and survival of juvenile Chinook salmon at a main-stem diversion dam

    Science.gov (United States)

    Perry, Russell W.; Kock, Tobias J.; Couter, Ian I; Garrison, Thomas M; Hubble, Joel D; Child, David B

    2016-01-01

    Diversion dams can negatively affect emigrating juvenile salmon populations because fish must pass through the impounded river created by the dam, negotiate a passage route at the dam and then emigrate through a riverine reach that has been affected by reduced river discharge. To quantify the effects of a main-stem diversion dam on juvenile Chinook salmon in the Yakima River, Washington, USA, we used radio telemetry to understand how dam operations and river discharge in the 18-km reach downstream of the dam affected route-specific passage and survival. We found evidence of direct mortality associated with dam passage and indirect mortality associated with migration through the reach below the dam. Survival of fish passing over a surface spill gate (the west gate) was positively related to river discharge, and survival was similar for fish released below the dam, suggesting that passage via this route caused little additional mortality. However, survival of fish that passed under a sub-surface spill gate (the east gate) was considerably lower than survival of fish released downstream of the dam, with the difference in survival decreasing as river discharge increased. The probability of fish passing the dam via three available routes was strongly influenced by dam operations, with passage through the juvenile fish bypass and the east gate increasing with discharge through those routes. By simulating daily passage and route-specific survival, we show that variation in total survival is driven by river discharge and moderated by the proportion of fish passing through low-survival or high-survival passage routes.

  13. Sampling of prenatal and postnatal offspring from individual rat dams enhances animal use without compromising development

    Science.gov (United States)

    Alberts, J. R.; Burden, H. W.; Hawes, N.; Ronca, A. E.

    1996-01-01

    To assess prenatal and postnatal developmental status in the offspring of a group of animals, it is typical to examine fetuses from some of the dams as well as infants born to the remaining dams. Statistical limitations often arise, particularly when the animals are rare or especially precious, because all offspring of the dam represent only a single statistical observation; littermates are not independent observations (biologically or statistically). We describe a study in which pregnant laboratory rats were laparotomized on day 7 of gestation (GD7) to ascertain the number and distribution of uterine implantation sites and were subjected to a simulated experience on a 10-day space shuttle flight. After the simulated landing on GD18, rats were unilaterally hysterectomized, thus providing a sample of fetuses from 10 independent uteruses, followed by successful vaginal delivery on GD22, yielding postnatal samples from 10 uteruses. A broad profile of maternal and offspring morphologic and physiologic measures indicated that these novel sampling procedures did not compromise maternal well-being and maintained normal offspring development and function. Measures included maternal organ weights and hormone concentrations, offspring body size, growth, organ weights, sexual differentiation, and catecholamine concentrations.

  14. Monitoring health in African dams : the Kamburu dam (Kenya) as a test case

    NARCIS (Netherlands)

    J.M.V. Oomen

    1981-01-01

    textabstractDams are among the obvious efforts to improve the economic situation in a developing country. They aim at using locally available natural resources. At present they are among the most popular means for promoting socio-economic development. A significant number of these programmes have be

  15. Advanced numerical simulation of collapsible earth dams

    Energy Technology Data Exchange (ETDEWEB)

    De Farias, M.M.; Cordao Neto, M.P. [Brasilia Univ., Federal District (Brazil). Dept. of Civil and Environmental Engineering

    2010-12-15

    This paper discussed a systematic methodology for the hydromechanical coupled numerical analysis of earth dams constructed with unsaturated collapsible soil. Every design stage was considered, including construction, reservoir filling, and advance of saturation front until the steady-state flow condition is attained. A transient analysis of safety factors applicable to 3-dimensional conditions was presented, giving consideration to unsaturated materials and the interrelation between hydraulic and mechanical phenomena by solving equilibrium and continuity conditions at the same time. The finite element method was used to formulate equilibrium and continuity conditions for both soil skeleton and pore water, which necessitated a realistic mechanical model for the stress-strain-suction relation in unsaturated porous material and adequate constitutive models related to water flow and storage, giving special consideration to imposing appropriate boundary conditions for each simulation stage. The methodology was applied to the analysis of earth dams composed of soils at optimum, dry of optimum, and mixed compaction conditions. The dry section simulated dams constructed using poorly compacted, dry material, which are prone to collapse. By strategically placing the optimum materials in the areas of the earth fill that are most stressed, the mixed section could be designed less expensively with the same or better performance as the homogenous section at optimum conditions. The coupled analysis provides a higher safety factor than uncoupled analysis and a realistic picture of end-of-construction pore pressure distribution. The simulation of reservoir filling and saturation front advance permitted clear identification of the initialization, development, and evolution of internal failure mechanisms. 21 refs., 6 tabs., 19 figs.

  16. Increased ultrasonic vocalizations and risk-taking in rat pups of sleep-deprived dams.

    Science.gov (United States)

    Gulia, Kamalesh K; Patel, Niraj; Kumar, Velayudhan Mohan

    2015-02-01

    Ultrasonic vocalizations (USVs) in rodent pups are analogous to cries in human babies. There is reduction in USVs in pups after experimental deprivation of rapid eye movement sleep of dams during pregnancy. However, the effects of total sleep deprivation on the USVs of newborns and their emotional development are not documented. Male pups born to the rats that underwent total sleep deprivation for 5h during the third trimester made higher vocalizations, when tested on early postnatal days (pnds) in an isolation-paradigm. Their anxiety-related behaviors during pnds 25-28, were tested using elevated plus maze (EPM). In comparison to the control pups, weanlings of sleep-deprived dams made increased entries into the open arms and higher mobility in the EPM. Enhanced distress calls during early pnds and reduction in risk assessment in weanlings indicate a link between the two behaviors. The USVs during ontogeny may provide early signals about altered emotional development.

  17. Evaluation Model of Life Loss Due to Dam Failure

    Science.gov (United States)

    Huang, Dongjing

    2016-04-01

    Dam failure poses a serious threat to human life, however there is still lack of systematic research on life loss which due to dam failure in China. From the perspective of protecting human life, an evaluation model for life loss caused by dam failure is put forward. The model building gets three progressive steps. Twenty dam failure cases in China are preferably chosen as the basic data, considering geographical location and construction time of dams, as well as various conditions of dam failure. Then twelve impact factors of life loss are selected, including severity degree of flood, population at risk, understanding of dam failure, warning time, evacuation condition, number of damaged buildings, water temperature, reservoir storage, dam height, dam type, break time and distance from flood area to dam. And through principal component analysis, it gets four principal components consisting of the first flood character principle component, the second warning system principle component, the third human character principle component and the fourth space-time impact principle component. After multivariate nonlinear regression and ten-fold validation in combination, the evaluation model for life loss is finally established. And the result of the proposed model is closer to the true value and better in fitting effect in comparison with the results of RESCDAM method and M. Peng method. The proposed model is not only applied to evaluate life loss and its rate under various kinds of dam failure conditions in China, but also provides reliable cause analysis and prediction approach to reduce the risk of life loss.

  18. Earthquake safety assessment of concrete arch and gravity dams

    Institute of Scientific and Technical Information of China (English)

    Lin Gao; Hu Zhiqiang

    2005-01-01

    Based on research studies currently being carried out at Dalian University of Technology, some important aspects for the earthquake safety assessment of concrete dams are reviewed and discussed. First, the rate-dependent behavior of concrete subjected to earthquake loading is examined, emphasizing the properties of concrete under cyclic and biaxial loading conditions. Second, a modified four-parameter Hsieh-Ting-Chen viscoplastic consistency model is developed to simulate the rate-dependent behavior of concrete. The earthquake response of a 278m high arch dam is analyzed, and the results show that the strain-rate effects become noticeable in the inelastic range. Third, a more accurate non-smooth Newton algorithm for the solution of three-dimensional frictional contact problems is developed to study the joint opening effects of arch dams during strong earthquakes. Such effects on two nearly 300m high arch dams have been studied. It was found that the canyon shape has great influence on the magnitude and distribution of the joint opening along the dam axis. Fourth, the scaled boundary finite element method presented by Song and Wolf is employed to study the dam-reservoir-foundation interaction effects of concrete dams. Particular emphases were placed on the variation of foundation stiffness and the anisotropic behavior of the foundation material on the dynamic response of concrete dams. Finally, nonlinear modeling of concrete to study the damage evolution of concrete dams during strong earthquakes is discussed. An elastic-damage mechanics approach for damage prediction of concrete gravity dams is described as an example. These findings are helpful in understanding the dynamic behavior of concrete dams and promoting the improvement of seismic safety assessment methods.

  19. The World Commission on Dams + 10: Revisiting the Large Dam Controversy

    Directory of Open Access Journals (Sweden)

    Deborah Moore

    2010-06-01

    Full Text Available The World Commission on Dams (WCD was an experiment in multi-stakeholder dialogue and global governance concerned with a subject area – large dams – that was fraught with conflict and controversy. The WCD Report, Dams and Development: A New Framework for Decision-Making, was published in 2000 and accompanied by hopes that broad-based agreements would be forged on how to better manage water and energy development. Ten years later, this special issue of Water Alternatives revisits the WCD and its impacts, exploring the question: Is the WCD still relevant? The editorial team and the Guest Editors of this special issue of Water Alternatives have selected a range of 20 papers, 6 viewpoints, and 4 book reviews that help to illustrate the evolution in the dams debate. The goal of this special issue is to examine the influence and the impacts of the WCD on the dam enterprise, in general, and on the policies and practices of key stakeholders and institutions, and on the development outcomes for affected communities and environments, in particular. In this introduction, the Guest Editors provide an overview of the special issue, exploring the new drivers of dam development that have emerged during the last decade, including climate change and new financiers of dams, and describing the themes emerging from this diverse set of papers and viewpoints. This special issue demonstrates the need for a renewed multi-stakeholder dialogue at multiple levels. This would not be a redo of the WCD, but rather a rekindling and redesigning of processes and forums where mutual understanding, information-sharing, and norm-setting can occur. One of the most promising developments of the last decade is the further demonstration, in case studies described here, that true partnership amongst key stakeholders can produce transformative resource-sharing agreements, showing that many of the WCD recommendations around negotiated decision making are working in practice. We hope

  20. Minimum Reservoir Water Level in Hydropower Dams

    Science.gov (United States)

    Sarkardeh, Hamed

    2017-07-01

    Vortex formation over the intakes is an undesirable phenomenon within the water withdrawal process from a dam reservoir. Calculating the minimum operating water level in power intakes by empirical equations is not a safe way and sometimes contains some errors. Therefore, current method to calculate the critical submergence of a power intake is construction of a scaled physical model in parallel with numerical model. In this research some proposed empirical relations for prediction of submergence depth in power intakes were validated with experimental data of different physical and numerical models of power intakes. Results showed that, equations which involved the geometry of intake have better correspondence with the experimental and numerical data.

  1. Hovercraft drill probes Saraji tailings dam

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    In early operations at BHP-Utah's Saraji Mine in central Queensland, quantities of coking coal were pumped into the tailings dam because the preparation plant's flotation circuit was unable to handle ultra-fines. A reverse circulating drilling rig mounted on a hovercraft was used to recover 22 samples (representing 9 metres of tailings from 11 x 8 x 0.09 metre cores) in an investigation into whether the tailings can now be treated economically. 1 fig.

  2. Effects of removing Good Hope Mill Dam on selected physical, chemical, and biological characteristics of Conodoguinet Creek, Cumberland County, Pennsylvania

    Science.gov (United States)

    Chaplin, Jeffrey J.; Brightbill, Robin A.; Bilger, Michael D.

    2005-01-01

    The implications of dam removal on channel characteris-tics, water quality, benthic invertebrates, and fish are not well understood because of the small number of removals that have been studied. Comprehensive studies that document the effects of dam removal are just beginning to be published, but most research has focused on larger dams or on the response of a sin-gle variable (such as benthic invertebrates). This report, pre-pared in cooperation with the Conodoguinet Creek Watershed Association, provides an evaluation of how channel morphol-ogy, bed-particle-size distribution, water quality, benthic inver-tebrates, fish, and aquatic habitat responded after removal of Good Hope Mill Dam (a small 'run of the river' dam) from Conodoguinet Creek in Cumberland County, Pa. Good Hope Mill Dam was a 6-foot high, 220-foot wide concrete structure demolished and removed over a 3-day period beginning with the initial breach on November 2, 2001, at 10:00 a.m. eastern standard time. To isolate the effects of dam removal, data were collected before and after dam removal at five monitoring stations and over selected reaches upstream, within, and downstream of the impoundment. Stations 1, 2, and 5 were at free-flowing control locations 4.9 miles upstream, 2.5 miles upstream, and 5 miles downstream of the dam, respec-tively. Stations 3 and 4 were located where the largest responses were anticipated, 115 feet upstream and 126 feet downstream of the dam, respectively Good Hope Mill Dam was not an effective barrier to sedi-ment transport. Less than 3 inches of sediment in the silt/clay-size range (less than 0.062 millimeters) coated bedrock within the 7,160-foot (1.4-mile) impoundment. The bedrock within the impoundment was not incised during or after dam removal, and the limited sediment supply resulted in no measurable change in the thalweg elevation downstream of the dam. The cross-sec-tional areas at stations 3 and 4, measured 17 days and 23 months after dam removal, were within

  3. Major Dams of the United States - Direct Download

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  4. Numerical Modeling of Sliding Stability of RCC dam

    Science.gov (United States)

    Mughieda, O.; Hazirbaba, K.; Bani-Hani, K.; Daoud, W.

    2017-06-01

    Stability and stress analyses are the most important elements that require rigorous consideration in design of a dam structure. Stability of dams against sliding is crucial due to the substantial horizontal load that requires sufficient and safe resistance to develop by mobilization of adequate shearing forces along the base of the dam foundation. In the current research, the static sliding stability of a roller-compacted-concrete (RCC) dam was modelled using finite element method to investigate the stability against sliding. A commercially available finite element software (SAP 2000) was used to analyze stresses in the body of the dam and foundation. A linear finite element static analysis was performed in which a linear plane strain isoperimetric four node elements was used for modelling the dam-foundation system. The analysis was carried out assuming that no slip will occur at the interface between the dam and the foundation. Usual static loading condition was applied for the static analysis. The greatest tension was found to develop in the rock adjacent to the toe of the upstream slope. The factor of safety against sliding along the entire base of the dam was found to be greater than 1 (FS>1), for static loading conditions.

  5. Safety of Italian dams in the face of flood hazard

    Science.gov (United States)

    Bocchiola, Daniele; Rosso, Renzo

    2014-09-01

    Most rivers in Italy are segmented by dams that need rehabilitation because of (1) safety requirements by increasingly risk-averse societies, (2) changes in the downstream river and riparian system after dams building, (3) poor initial design at the time of completion and (4) modified priorities of watershed management. Safe design of flood spillways is a major concern, and requires to cope with low frequency flood hazard. One must estimate flood figures with high return periods (R ⩾ 1000-10,000 years) but statistical methods involve large uncertainties because of the short length of the available records. This paper investigates the return period of the design flood of existing spillways RS of large dams in Italy. We used re-normalized flood frequency approach and regionalization using the Generalized Extreme Value distribution. The estimation of the site specific index flood is carried out by simple scaling with basin area at the regional level. The result show that 55% (245) of the 448 examined dams are equipped by spillway with RS > 10,000; and 71% (315) of the dams have RS > 1000. Conversely, 29% (130) of the dams display RS routing may dampen the outflow hydrograph, but one should carefully account for the need of achieving accurate dam safety assessment of these dams based on site specific investigations, also accounting for global change forcing.

  6. Research advance in safety analysis methods for high concrete dam

    Institute of Scientific and Technical Information of China (English)

    REN; QingWen; XU; LanYu; WAN; YunHui

    2007-01-01

    High tensile stresses occurred in high concrete dams and in their foundation lead to the growing importance of their safety with the increase of concrete dam height.Without any exiting specification or successful experiences of concrete dams up to 300 m at home and abroad for reference,experts feel obliged to figure out how to perform safety analysis on high concrete dam.This paper involves the main contents and mechanical features of the safety analysis on high concrete dam and shows the current state and progress of the analysis methods.For the insufficiency and problems existing in normative methods,study on modern numerical method such as finite element method must be strengthened to find out the stress control criterion which is in accordance with the methods.Two aspects of the safety analysis of high dam--local damage from material level and integral destruction from structure level--should be considered.For the local damage,we should consider the non-homogeneity of material and strengthen the research of meso-damage mechanics.While for integral destruction of the system of high dam and its foundation,a study on non-strength theory should receive enough concerns.Further,attention should be paid to the research on the failure modes and criterions of high concrete dam failure analysis and safety evaluation,and the effect of uncertainty and classification of safety should be considered too.

  7. Measures of struggle against appearance of cracks in earth dams

    Directory of Open Access Journals (Sweden)

    Ibraeva Yulia

    2016-01-01

    Full Text Available The article describes a method calculation of the basic parameters of the transverse rows of pile of simple printed or precast dam. As well, in this article have been shown all the necessary formulas for this calculation and have been proposed solutions to prevent cracking in the dams.

  8. Geophysical methods for the assessment of earthen dams

    Science.gov (United States)

    Dams and levees are an integral part of the fluvial system in watersheds. Their stability is of utmost concern to the Nation and to those directly impacted should failure occur. There are some 88,000 dams and 110,000 miles of levees in the USA. Many of those are earthen embankments and structures su...

  9. 33 CFR 117.705 - Beaver Dam Creek.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Beaver Dam Creek. 117.705 Section 117.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New Jersey § 117.705 Beaver Dam Creek. The draw of...

  10. 78 FR 7810 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2013-02-04

    ... Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of public meeting. SUMMARY: The Glen Canyon Dam Adaptive Management Work Group.... L. 102-575) of 1992. The AMP includes a Federal advisory committee, the AMWG, a technical work...

  11. 75 FR 34476 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2010-06-17

    ... Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group AGENCY: Bureau of Reclamation... Interior (Secretary) is renewing the charter for the Glen Canyon Dam Adaptive Management Work Group. The purpose of the Adaptive Management Work Group is to advise and to provide recommendations to the...

  12. 78 FR 21415 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2013-04-10

    ... Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of public meeting. SUMMARY: The Glen Canyon Dam Adaptive Management Work Group..., the AMWG, a technical work group, a Grand Canyon Monitoring and Research Center, and...

  13. 77 FR 43117 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2012-07-23

    ... Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of public meeting. SUMMARY: The Glen Canyon Dam Adaptive Management Work Group... Federal advisory committee, the AMWG, a technical work group (TWG), a Grand Canyon Monitoring and...

  14. 77 FR 9265 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2012-02-16

    ... Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of public meeting. SUMMARY: The Glen Canyon Dam Adaptive Management Work Group... Federal advisory committee, the AMWG, a technical work group (TWG), a Grand Canyon Monitoring and...

  15. Institutionalizing the option of dam removal: the New Hampshire initiative.

    Science.gov (United States)

    Lindloff, S D

    2003-01-01

    For two years, the State of New Hampshire has worked to institutionalize the option of dam removal. The high gradient streams that flow through the granite hills and mountains of this small northeastern state provided ideal conditions for dam construction, particularly during America's Industrial Revolution of the 1800s when mills were constructed throughout the area. With more than 4,800 dams in the state's database, there are many opportunities for the removal of dams that no longer serve a useful purpose, have become a public safety hazard and impact the river environment. Efforts to facilitate removal of dams in New Hampshire include the formation of a River Restoration Task Force and the creation of a dam removal program within the state agency responsible for regulating dams. This has led to the removal of two dams in the past year, with approximately ten additional projects in various stages of planning. A history of this agency-led initiative, as well as a discussion of the program's strengths, challenges and goals for the future are presented.

  16. How to manage the cumulative flood safety of catchment dams

    African Journals Online (AJOL)

    2008-09-15

    Sep 15, 2008 ... Sustainable Law and Engineering Group, Centre for Accounting, Governance and Sustainability, ... associated with small-dam safety and practical feedback from ... catchment dams nor the supervision over the management of .... same time in an extreme design flood event of only 1-in-200 ..... These guide-.

  17. Will the Three Gorges Dam Stand The Test of Time?

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    @@ Netizens have collected several ar-ticles about the flood-control capacity of the Three Gorges Dam. In these articles, its capacity was differently described as tackling flooding "once-in-10,000-years" "once-in- l,O00-years" or "once-in-a-century" Can you give the specifics of the flood control capacity of the dam?

  18. INTRODUCTION All earth dams in their natural state experience ...

    African Journals Online (AJOL)

    Earth Dam constructed within the Precambrian Basement Complex terrain of Southwestern Nigeria. The study was aimed at ... The 2-D resistivity structure revealed that the core of the dam embankment is .... within the rain forest region of Nigeria. The ..... (citrus Sinensis Osbeck) Stored at Ambient Tropical Condition. 251.

  19. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival Proportions at John Day Dam, 2009

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Deng, Zhiqun; Fu, Tao; Kim, Jin A.; Johnson, Gary E.; Fischer, Eric S.; Khan, Fenton; Zimmerman, Shon A.; Faber, Derrek M.; Carter, Kathleen M.; Boyd, James W.; Townsend, Richard L.; Skalski, J. R.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Meyer, Matthew M.

    2011-09-28

    The overall purpose of the acoustic telemetry study at JDA during 2009 was to determine the best configuration and operation for JDA prior to conducting BiOp performance standard tests. The primary objective was to determine the best operation between 30% and 40% spill treatments. Route-specific and JDA to TDA forebay survival estimates, passage distribution, and timing/behavior metrics were used for comparison of 30% to a 40% spill treatments. A secondary objective was to evaluate the performance of TSWs installed in spill bays 15 and 16 and to estimate fish survival rates and passage efficiencies under 30% and 40% spill-discharge treatments each season.

  20. Seepage problem in Papan dam and the treatment

    Energy Technology Data Exchange (ETDEWEB)

    Sharghi, A. [JTMA Co., Tehran (Iran, Islamic Republic of); Palassi, M. [Tehran Univ. (Iran, Islamic Republic of). Dept. of Civil Engineering

    2003-07-01

    The Papan dam in the Krygyz Republic is 97 metres high. It is located in the Osh Oblast, within a narrow and steep sided gorge on the Ak-Bura River, approximately 20 kilometres south of the City of Osh. The impoundment of the dam revealed large inflows of water to the downstream dam through the upper half of the dam and through the joints in the right abutment. A number of options were considered before a treatment method was selected. The causes of the leakage were poor grouting, and joints and fissures in the abutment. The remedial process involved the use of a plastic concrete cutoff wall extended from the crest of the dam to a depth of approximately 70 metres, in addition to the use of a grouting curtain in the right abutment. 2 figs.

  1. Sediment settling in the Latian Dam in Iran

    Institute of Scientific and Technical Information of China (English)

    Farhang BEHRANGI; Mohammad Ali BANIHASHEMI; Shayesteh MAHANI; Mohammad Reza RAHMANIAN

    2014-01-01

    Among the difficulties that influence future dam operations, reservoir sedimentation is the most problematic for engineers. This study predicted the amount and pattern of sedimentation for use in estimation of the useful lifespan of reservoirs and identification of optimal locations for outlets and intakes at the initial stages of dam design. Hydrographic surveys of different dams can provide better insight into this phenomenon. Latian Dam in Iran has conducted hydrographic surveys during 7 time periods. The amount and process of sedimentation in this reservoir were determined, and predictions of distribution of sediments were validated by well-known, common methods. The formation of a delta in the reservoir was investigated for different time periods after operation. Future problems due to the impacts of sedimentation on dam operation and the useful lifespan of the reservoir were predicted. In addition, the study results may be used for developing empirical methods to predict sedimentation patterns in other reservoirs.

  2. Management of dam safety at BC Hydro: the database tool

    Energy Technology Data Exchange (ETDEWEB)

    Oswell, Terry [BC Hydrom Burnaby, (Canada)

    2010-07-01

    BC Hydro has a wide range of dams, which raises a wide range of issues at many unique sites. A dam safety database was developed in 2000 to deal with the complexity and volume of information provided by deficiency investigations and surveillances. The database contains all documented deficiencies and non-conformances identified in the past 10 years. It records the risk ratings assigned to each issue. This paper described the implementation of the database tool, from the characterization of a dam safety issue to the use of the database itself. The dam safety database is now a key tool in managing the dam safety program at BC Hydro and has been useful for the last 10 years or so in prioritizing the program of deficiency investigations and capital projects. The development of a process to rate non-conformances is currently under study and will be implemented soon to aid in more efficient prioritization of maintenance activities.

  3. Modeling Experiment of Break of Debris-Flow Dam

    Institute of Scientific and Technical Information of China (English)

    CHENG Zunlan; GENG Xueyong; DANG Chao; LIU Jingjing

    2007-01-01

    Glaciers are extensively developed in the southwest of Tibet and the moraines are widely distributed with large depth. Large-scale debris flows are often reported which blocked rivers and formed dams. In this paper, seven large debris flows in four valleys are discussed, among which five dams developed. 13 sets of experiments have been conducted in laboratory to simulate the formation and failure of the dam. Finally, a model of dam failure is proposed and a formula is established to calculate the flood discharge:Q = kbhhk/T (B)/LG0.41, where bk is the outlet width of the dam atthe original water level, ht the erosive depth, T the time fromoverflow to final state of failure, the average width of lake; L thelength of the lake, and G the total potential energy of the water inthe lake.

  4. Dam Inventory - DAMS_1996_EPA_IN: Inventory of Dams in Indiana, Derived from EPA BASINS (United States Environmental Protection Agency, Point Shapefile)

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — DAMS_1996_EPA_IN is a point shapefile developed by the USEPA BASINS 3.0 program and clipped by Bernardin, Lochmueller and Associates. Clips were performed using the...

  5. Channel evolution on the dammed Elwha River, Washington, USA

    Science.gov (United States)

    Draut, A.E.; Logan, J.B.; Mastin, M.C.

    2011-01-01

    Like many rivers in the western U.S., the Elwha River, Washington, has changed substantially over the past century in response to natural and human forcing. The lower river is affected by two upstream dams that are slated for removal as part of a major river restoration effort. In preparation for studying the effects of dam removal, we present a comprehensive field and aerial photographic analysis of dam influence on an anabranching, gravel-bed river. Over the past century with the dams in place, loss of the upstream sediment supply has caused spatial variations in the sedimentary and geomorphic character of the lower Elwha River channel. Bed sediment is armored and better sorted than on the naturally evolving bed upstream of the dams. On time scales of flood seasons, the channel immediately below the lower dam is fairly stable, but progresses toward greater mobility downstream such that the lowermost portion of the river responded to a recent 40-year flood with bank erosion and bed-elevation changes on a scale approaching that of the natural channel above the dams. In general, channel mobility in the lowest 4 km of the Elwha River has not decreased substantially with time. Enough fine sediment remains in the floodplain that – given sufficient flood forcing – the channel position, sinuosity, and braiding index change substantially. The processes by which this river accesses new fine sediment below the dams (rapid migration into noncohesive banks and avulsion of new channels) allow it to compensate for loss of upstream sediment supply more readily than would a dammed river with cohesive banks or a more limited supply of alluvium. The planned dam removal will provide a valuable opportunity to evaluate channel response to the future restoration of natural upstream sediment supply.

  6. Check dam and polyacrylamide performance under simulated stormwater runoff.

    Science.gov (United States)

    Kang, Jihoon; McCaleb, Melanie M; McLaughlin, Richard A

    2013-11-15

    High levels of turbidity and fine suspended sediments are often found in stormwater discharges from construction sites even when best management practices (BMPs) for sediment control are in place. This study evaluated turbidity reduction by three check dam types: 1) rock check dam representing a standard BMP, 2) excelsior wattle representing a fiber check dam (FCD), and 3) rock check dam wrapped with excelsior erosion control blanket (rock + excelsior ECB) representing an alternative FCD. Three check dams (all same type) were installed in a lined, 24-m ditch on a 5-7% slope and three consecutive simulated stormwater flows were run in the ditch. Additional tests were performed by adding granular polyacrylamide (PAM) on the check dams in the same manner using two sediment sources differing in clay content. Without PAM treatment, significantly higher effluent turbidity (>900 nephelometric turbidity units (NTU)) exited the ditch with rock check dams than with excelsior wattles or rock + excelsior ECBs (dam types was in the order of excelsior wattle > rock + excelsior ECB > rock check dam, indicating better water pooling behind the wattle. The PAM treatment reduced turbidity substantially (>75% relative to no PAM treatment) for all check dam types and it was very effective in excelsior wattles (<57 NTU) and rock + excelsior ECBs (<90 NTU) even during the third storm event. This study demonstrates that the passive treatment of runoff with PAM on FCDs (or rock + excelsior ECB) in construction site ditches can be very effective for sediment retention and turbidity reduction.

  7. Geophysical Investigations at Hidden Dam, Raymond, California Flow Simulations

    Science.gov (United States)

    Minsley, Burke J.; Ikard, Scott

    2010-01-01

    Numerical flow modeling and analysis of observation-well data at Hidden Dam are carried out to supplement recent geophysical field investigations at the site (Minsley and others, 2010). This work also is complementary to earlier seepage-related studies at Hidden Dam documented by Cedergren (1980a, b). Known seepage areas on the northwest right abutment area of the downstream side of the dam was documented by Cedergren (1980a, b). Subsequent to the 1980 seepage study, a drainage blanket with a sub-drain system was installed to mitigate downstream seepage. Flow net analysis provided by Cedergren (1980a, b) suggests that the primary seepage mechanism involves flow through the dam foundation due to normal reservoir pool elevations, which results in upflow that intersects the ground surface in several areas on the downstream side of the dam. In addition to the reservoir pool elevations and downstream surface topography, flow is also controlled by the existing foundation geology as well as the presence or absence of a horizontal drain in the downstream portion of the dam. The current modeling study is aimed at quantifying how variability in dam and foundation hydrologic properties influences seepage as a function of reservoir stage. Flow modeling is implemented using the COMSOL Multiphysics software package, which solves the partially saturated flow equations in a two-dimensional (2D) cross-section of Hidden Dam that also incorporates true downstream topography. Use of the COMSOL software package provides a more quantitative approach than the flow net analysis by Cedergren (1980a, b), and allows for rapid evaluation of the influence of various parameters such as reservoir level, dam structure and geometry, and hydrogeologic properties of the dam and foundation materials. Historical observation-well data are used to help validate the flow simulations by comparing observed and predicted water levels for a range of reservoir elevations. The flow models are guided by, and

  8. A Day For Love

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    Young couples drive Valentine’s Day booms in China It is not clear when Chinese couplesstarted celebrating Valentine’s Day,but it has now firmly established itself as an important day around the Spring Festival,

  9. Safety and coping strategy for high dam under complex natural conditions

    Institute of Scientific and Technical Information of China (English)

    Niu Xinqiang

    2012-01-01

    In respect to current situation and new challenges for high dam construction in China, safety problems are an- alyzed for high dam construction under complex natural conditions such as high elevation, cold area, high seismic inten- sity, large-seale landslide and high dam and huge reservoirs with dam types such as concrete surface rock-fill, asphalt concrete core, roller compacted concrete (RCC) arch dam and so on. From several aspects, including risk response measures for high dam, strengthening safety awareness for high dam design and construction, improving high dam con- struetion technique, intelligent dam safety management system based on IT, developing dam rehabilitation and mainte- nance technologies, useful dam safety and coping strategy is proposed.

  10. An evaluation of fish behavior upstream of the water temperature control tower at Cougar Dam, Oregon, using acoustic cameras, 2013

    Science.gov (United States)

    Adams, Noah S.; Smith, Collin; Plumb, John M.; Hansen, Gabriel S.; Beeman, John W.

    2015-07-06

    This report describes the initial year of a 2-year study to determine the feasibility of using acoustic cameras to monitor fish movements to help inform decisions about fish passage at Cougar Dam near Springfield, Oregon. Specifically, we used acoustic cameras to measure fish presence, travel speed, and direction adjacent to the water temperature control tower in the forebay of Cougar Dam during the spring (May, June, and July) and fall (September, October, and November) of 2013. Cougar Dam is a high-head flood-control dam, and the water temperature control tower enables depth-specific water withdrawals to facilitate adjustment of water temperatures released downstream of the dam. The acoustic cameras were positioned at the upstream entrance of the tower to monitor free-ranging subyearling and yearling-size juvenile Chinook salmon (Oncorhynchus tshawytscha). Because of the large size discrepancy, we could distinguish juvenile Chinook salmon from their predators, which enabled us to measure predators and prey in areas adjacent to the entrance of the tower. We used linear models to quantify and assess operational and environmental factors—such as time of day, discharge, and water temperature—that may influence juvenile Chinook salmon movements within the beam of the acoustic cameras. Although extensive milling behavior of fish near the structure may have masked directed movement of fish and added unpredictability to fish movement models, the acoustic-camera technology enabled us to ascertain the general behavior of discrete size classes of fish. Fish travel speed, direction of travel, and counts of fish moving toward the water temperature control tower primarily were influenced by the amount of water being discharged through the dam.

  11. Riverbed-Sediment Mapping in the Edwards Dam Impoundment on the Kennebec River, Maine By Use of Geophysical Techniques

    Science.gov (United States)

    Dudley, Robert W.

    1999-01-01

    INTRODUCTION In July 1997, the Federal Energy Regulatory Commission (FERC) issued a Final Environmental Impact Statement recommending that the 162-year-old Edwards Dam on the Kennebec River in Augusta, Maine, be removed. The impoundment formed by Edwards Dam extends about 15 mi to the city of Waterville, near the confluence of the Sebasticook River with the Kennebec River. The impoundment has a surface area of 1,143 acres, a gross storage of approximately 740 million ft3, and a usable storage of about 184 million ft3 (Stone and Webster, 1995a). According to FERC, removal of the 917-ft-long, 24-ft-high timber crib and concrete structure would restore 15 mi of riverine habitat, improve passage of ocean-migrating fish species native to the Kennebec River, and result in substantial recreational enhancements (Federal Energy Regulatory Commission, 1997). Because the removal of Edwards Dam would change the hydraulic characteristics of the river in the present-day impoundment, the potential transport of erodible, fine-grained sediment currently in the impoundment is a concern. Of particular concern is the erosion and transport of this sediment to areas downstream from the dam, a process that could introduce possible bacterial and chemical contamination and could impede river navigation as a result of sediment deposition. In an effort to build upon available information on the composition of the riverbed, the U.S. Geological Survey (USGS), in cooperation with the Maine State Planning Office, classified riverbed sediment types and mapped their areal extents in the lower (southern) half of the Edwards Dam impoundment. This report describes the methods used to collect and analyze the data used to create a map of sediment types in the Edwards Dam impoundment. The map is included with this report. Data used to map riverbed sediment types were also used to estimate the volume of observed mud and mud-containing sediment in the study area.

  12. The Political Ecology of Chinese Large Dams in Cambodia: Implications, Challenges and Lessons Learnt from the Kamchay Dam

    Directory of Open Access Journals (Sweden)

    Giuseppina Siciliano

    2016-09-01

    Full Text Available Given the opportunities offered by foreign investment in energy infrastructure mostly by Chinese firms, the Government of Cambodia is giving high priority to developing hydropower resources for reducing energy poverty and powering economic growth. Using a “Political ecology of the Asian drivers” framework, this paper assesses China’s involvement in the development of large dams’ in Cambodia and its impacts on the access of natural resources such as water and energy by dam builders, local communities and the government. This analysis is based on 61 interviews and 10 focus group discussions with affected communities, institutional actors, Chinese dam builders and financiers in relation to the first large Chinese dam built in Cambodia: the Kamchay dam. Based on the results of the analysis this paper makes recommendations on how to improve the planning, implementation and governance of future large dams in Cambodia.

  13. Estimating Snow Budget of Karaj Dam Reservoir

    Directory of Open Access Journals (Sweden)

    Manijeh G. Tali

    2009-01-01

    Full Text Available Problem statement: Most of the cold period precipitation of Karaj Basin falls in the form of snow. This snow and its run off are important to the dam and the local needs such as agriculture and the drinking water of Tehran. But due to the scarcity and in some elevations the lack of weather stations, measuring this snow cover and its run off is difficult. We have decided to estimate the amount of this snow cover by using surrogate methods such as satellite images of MODIS and temperature thresholds. Approach: To estimate the snow water budget of the Karaj Dam Reservoir Basin, first a temperature threshold of 3° Celsius was defined according to the analysis of daily temperature and precipitation values of Nesa station during 1960-2000. The elevation of this temperature was as low as 1590 m in February and 5734 m in August. During each month the melting snow was computed over the area between 3 and zero degrees Celsius and precipitation below zero degrees was considered as permanent snow cover. The precipitation of areas above 3° was computed as rain. Using this temperature threshold and the DEM map of the basin we estimated the snow cover and snow melt water of the basin. The snow cover area on the MODIS images was estimated and compared with that computed from temperature threshold. Both methods gave relatively similar results. At the end the snow melt water of the whole cold period was calculated and added up to estimate the total snow water budget. Results: The results showed that during the study months most (67.7% of the precipitation comes in the form of snow. And most of this snow (97.5% melts during months March and onward. Its monthly distributions are 3.8% in March, 22.7% in April and 71% in May. The total snow water entering the dam was about 181.73 million cubic meters. Conclusion: The comparison of the results from temperature thresholds with the MODIS images snow cover showed very little and negligible discrepancy. Therefore, this

  14. Dam overtopping risk using probabilistic concepts – Case study: The Meijaran Dam, Iran

    Directory of Open Access Journals (Sweden)

    Ehsan Goodarzi

    2013-06-01

    Full Text Available Hydrologic risk assessment and uncertainty analysis by mathematical and statistical methods provide useful information for decision makers. This study presents the application of risk and uncertainty analysis to dam overtopping due to various inflows and wind speeds for the Meijaran Dam in the north of Iran. The procedure includes univariate flood and wind speed frequency analyses, reservoir routing, and integration of wind set-up and run-up to calculate the reservoir water elevation. Afterwards, the probability of overtopping was assessed by applying two uncertainty analysis methods (Monte Carlo simulation and Latin hypercube sampling, and considering the quantile of flood peak discharge, initial depth of water in the reservoir, and spillway discharge coefficient as uncertain variables. The results revealed that rising water level in the reservoir is the most important factor in overtopping risk analysis and that wind speed also has a considerable impact on reservoirs that are placed in windy areas.

  15. Fosfortab fra det dyrkede areal til Stevning Dam, Hindemaj og Haderslev Dam

    DEFF Research Database (Denmark)

    Andersen, Hans Estrup; Heckrath, Goswin; Thodsen, Hans;

    Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P-indeks-kortlægni......Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P...

  16. Monitoring hyporheic exchanges during a dam controlled experiment

    Science.gov (United States)

    Houzé, Clémence; Varnède, Lucie; Durand, Véronique; Pessel, Marc

    2016-04-01

    Precise understanding of the hyporheic exchanges response to stream flow fluctuations remains a great challenge for many environmental and hydrological problems. Multiplication of natural stream restoration programs and anthropic structures removal highlight that a better understanding of the hydrodynamic and ecological functioning of hyporheic exchanges is critical . The objective of this field experiment was to monitor the dynamic exchanges within the hyporheic zone due to an artificial stream head variation. Various types of measurements were performed, using natural tracers and electrical resistivity tomography (ERT). The dam downstream the studied river reach was successively lowered during two days, and raised during three days, implying river heads variations of about 15cm. The studied area was equipped with CTD probes (measuring the head and the conductivity) within the river, 2 multi-depths water sampling tubes inserted up to one meter depth within the riverbed deposits and 3 ERT profiles with various electrode spacing (20 cm, 25 cm, 50 cm). During the 5 days experiment, water sampling and ERT profiles were done regularly. Estimations of the sediments hydraulic conductivity were obtained by several slug tests in plastic tubes at different depths within the streambed. First results showed that stream fluctuation leads to a rapid hyporheic response according to chloride variations between stream and riverbed sediments. Similar results between geochemical and geophysical tools were found. A decrease in stream head leads to reduce the depth of the mixing zone, as the river gaining conditions intensify. On the contrary, we observed that an increased river head tends to deepen the hyporheic exchange zone.

  17. Bathymetric survey of the Brandon Road Dam Spillway, Joliet, Illinois

    Science.gov (United States)

    Engel, Frank; Krahulik, Justin

    2016-01-01

    Bathymetric survey data of the Brandon Road Dam spillway was collected on May 27 and May 28, 2015 by the US Geological Survey (USGS) using Trimble Real-Time Kinematic Global Positioning System (RTK-GPS) equipment. The base station was set up over a temporarily installed survey pin on both days. This pin was surveyed into an existing NGS benchmark (PID: BBCN12) within the Brandon Road Lock property. In wadeable sections, a GPS rover with 2.0 meter range pole and flat-foot was deployed. In sections unable to be waded, a 2.0 meter range pole was fix-mounted to a jon boat, and a boat-mounted Acoustic Doppler Current Profiler (ADCP) was used to collect the depth data. ADCP depth data were reviewed in the WinRiver II software and exported for processing with the Velocity Mapping Toolbox (Parsons and others, 2013). The RTK-GPS survey points of the water surface elevations were used to convert ADCP-measured depths into bed elevations. An InSitu Level Troll collected 1-minute water level data throughout the two day survey. These data were used to verify that a flat-pool assumption was reasonable for the conversion of the ADCP data to bed elevations given the measurement precision of the ADCP. An OPUS solution was acquired for each survey day.Parsons, D. R., Jackson, P. R., Czuba, J. A., Engel, F. L., Rhoads, B. L., Oberg, K. A., Best, J. L., Mueller, D. S., Johnson, K. K. and Riley, J. D. (2013), Velocity Mapping Toolbox (VMT): a processing and visualization suite for moving-vessel ADCP measurements. Earth Surf. Process. Landforms, 38: 1244–1260. doi: 10.1002/esp.3367

  18. Feeding Activity, Rate of Consumption, Daily Ration and Prey Selection of Major Predators in John Day Reservoir, 1984 : Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Gray, Gerard A.; United States. Bonneville Power Administration; U.S. Fish and Wildlife Service; National Fishery Research Center (U.S.)

    1986-07-01

    The extent of predation on juvenile salmonids in John Day Reservoir was determined. Salmonids were the single most important food item by weight for northern squawfish (Ptychocheilus oregonensis) in the restricted zones at McNary tailrace and John Day forebay during all sampling periods. Salmonids accounted for 18.1% of the weight in the diet of walleyes (Stizostedion vitreum vitreum) in 1984 which was at least twice that found in previous years. In smallmouth bass (Micropterus dolomieui) salmonids contributed little to their diet whereas for channel catfish (Ictalurus punctatus) fish accounted for 64.1% of the weight in their diet with salmonids responsible for approximately half of this weight. An intensive search of the fisheries literature was conducted to review various fish capture and control techniques which might have potential as predation control measures for the major predators of juvenile salmonids in the Columbia River system. Most prey protection measures were judged to have high potential and direct predator control measures were judged to have moderate or low potential.

  19. Feeding Activity, Rate of Consumption, Daily Ration and Prey Selection of Major Predators in John Day Reservoir, 1985: Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, Douglas E.; United States. Bonneville Power Administration; U.S. Fish and Wildlife Service; National Fishery Research Center (U.S.)

    1986-10-01

    This report summarizes activities in 1985 to determine the extent of predation on juvenile salmonids in John Day Reservoir. To estimate consumption of juvenile salmonids we used the composition of the natural diet of predators and in the laboratory determined rate of gastric evacuation by predators. Salmonids were the single most important food item for northern squawfish (Ptychocheilus oregonensis) at McNary tailrace during all sampling periods and at John Day forebay during July. Salmonids accounted for 11.6% of the diet of walleye (Stizostedion vitreum vitreum) in 1985 which was about twice that found in previous years. Salmonids contributed little to smallmouth bass (Micropterus dolomieui) diet but comprised about 25% of the diet of channel catfish (Ictalurus punctatus). Composition of prey taxa in beach seine catches in 1985 was similar to 1983 and 1984 with chinook salmon (Oncorhynchus tschawytscha), northern squawfish, largescale sucker (Catostomus macrocheilus), and sand roller (Percopsis transmontana) dominating the catch at main channel stations and crappies (Pomoxis spp.) and largescale sucker dominating at backwater stations. Preliminary results of beach seine efficiency studies suggest that seine efficiency varied significantly among prey species and between substrate types in 1985. Results of digestion rate experiments indicate that gastric evacuation in northern squawfish can be predicted using water temperature, prey weight, predator weight and time. 19 refs., 19 figs., 13 tabs.

  20. Experimental Trypanosoma brucei infection at immediate post partum period:effects on dam and the offspring

    Institute of Scientific and Technical Information of China (English)

    Izuchukwu S Ochiogu; Chukwuka N Uchendu; John I Ihedioha

    2010-01-01

    Objective:To investigate the effects of immediate post-partum infection with Trypanosoma brucei (T. brucei) on dam and offspring. Methods:Sixty female Albino rats (Rattus norvegicus) weighing between 130-170 g were used as animal model. The animals were divided as follows:25 infected between 1-5 days post partum; 10 infected unbred as positive controls; and 25 uninfected as negative controls. The following parameters were evaluated:packed cell volume (PCV), level of parasitaemia, survival time, litter size and litter weight at birth and on days 7, 14 and 21 post delivery, using conventional methods. Possible trans-mammary transmission of infection to litter through milk was also assessed. Results:The results showed a comparatively (P<0.05) higher mean PCV value for the uninfected negative control on the 8th day post infection compared with the infected groups which corresponded with the increasing level of parasitaemia in the two infected groups. Mean litter size and litter weights were higher (P< 0.05) in the uninfected controls on the 21st day. Survival time in the infected groups were similar. No evidence of trans-mammary transfer of infection was recorded. Conclusion:T. brucei infection during immediate post partum period is detrimental to the dam and impairs growth of the offspring.

  1. Mother’s Day

    Institute of Scientific and Technical Information of China (English)

    张萍

    2009-01-01

    Mother’s Day is a day for each family to honor (尊敬,给……以光荣) its mother ,celebrated (庆祝)on various days in many places around the world.It complements (补足,补充) Father’s Day,the celebration

  2. Evaluating temporal changes in hydraulic conductivities near karst-terrain dams: Dokan Dam (Kurdistan-Iraq)

    Science.gov (United States)

    Dafny, Elad; Tawfeeq, Kochar Jamal; Ghabraie, Kazem

    2015-10-01

    Dam sites provide an outstanding opportunity to explore dynamic changes in the groundwater flow regime because of the high hydraulic gradient rapidly induced in their surroundings. This paper investigates the temporal changes of the hydraulic conductivities of the rocks and engineered structures via a thorough analysis of hydrological data collected at the Dokam Dam, Iraq, and a numerical model that simulates the Darcian component of the seepage. Analysis of the data indicates increased seepage with time and suggests that the hydraulic conductivity of the rocks increased as the conductivity of the grout curtain decreased. Conductivity changes on the order of 10-8 m/s, in a 20-yr period were quantified using the numerical analysis. It is postulated that the changes in hydraulic properties in the vicinity of Dokan Dam are due to suspension of fine materials, interbedded in small fissures in the rocks, and re-settlement of these materials along the curtain. Consequently, the importance of the grout curtain to minimize the downstream seepage, not only as a result of the conductivity contrast with the rocks, but also as a barrier to suspended clay sediments, is demonstrated. The numerical analysis also helped us to estimate the proportion of the disconnected karstic conduit flow to the overall flow.

  3. Estimates o the risks associated with dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Ayyaswamy, P.; Hauss, B.; Hseih, T.; Moscati, A.; Hicks, T.E.; Okrent, D.

    1974-03-01

    The probabilities and potential consequences of dam failure in California, primarily due to large earthquakes, was estimated, taking as examples eleven dams having a relatively large population downstream. Mortalities in the event of dam failure range from 11,000 to 260,000, while damage to property may be as high as $720 million. It was assumed that an intensity IX or X earthquake (on the Modified Mercalli Scale) would be sufficient to completely fail earthen dams. Predictions of dam failure were based on the recurrence times of such earthquakes. For the dams studied, the recurrence intervals for an intensity IX earthquake varied between 20 and 800 years; for an intensity X between 50 and 30,000 years. For the Lake Chabot and San Pablo dams (respectively 20, 30 years recurrent earthquake times for a intensity X) the associated consequences are: 34,000 (Lake Chabot) and 30,000 (San Pablo) people killed; damage $140 million and $77 million. Evaculation was found to ameliorate the consequences slightly in most cases because of the short time available. Calculations are based on demography, and assume 10 foot floodwaters will drown all in their path and destroy all one-unit homes in the flood area. Damage estimates reflect losses incurred by structural damage to buildings and do not include loss of income. Hence the economic impact is probably understated.

  4. Responses of riparian reptile communities to damming and urbanization

    Science.gov (United States)

    Hunt, Stephanie D.; Guzy, Jacquelyn C.; Price, Steven J.; Halstead, Brian J.; Eskew, Evan A.; Dorcas, Michael E.

    2013-01-01

    Various anthropogenic pressures, including habitat loss, threaten reptile populations worldwide. Riparian zones are critical habitat for many reptile species, but these habitats are also frequently modified by anthropogenic activities. Our study investigated the effects of two riparian habitat modifications-damming and urbanization-on overall and species-specific reptile occupancy patterns. We used time-constrained search techniques to compile encounter histories for 28 reptile species at 21 different sites along the Broad and Pacolet Rivers of South Carolina. Using a hierarchical Bayesian analysis, we modeled reptile occupancy responses to a site's distance upstream from dam, distance downstream from dam, and percent urban land use. The mean occupancy response by the reptile community indicated that reptile occupancy and species richness were maximized when sites were farther upstream from dams. Species-specific occupancy estimates showed a similar trend of lower occupancy immediately upstream from dams. Although the mean occupancy response of the reptile community was positively related to distance downstream from dams, the occupancy response to distance downstream varied among species. Percent urban land use had little effect on the occupancy response of the reptile community or individual species. Our results indicate that the conditions of impoundments and subsequent degradation of the riparian zones upstream from dams may not provide suitable habitat for a number of reptile species.

  5. The collapse of the Sella Zerbino gravity dam.

    Science.gov (United States)

    Petaccia, G; Lai, C G; Milazzo, C; Natale, L

    2016-08-23

    When a severe flood wave completely filled the Ortiglieto reservoir on August 13, 1935, the 14 m high "Sella Zerbino" secondary dam failed catastrophically causing > 100 casualties. Both of the dams, Sella Zerbino-Zerbino Saddle and Bric Zerbino-Zerbino Peak (Fig. 1) were overtopped but only the Sella Zerbino failed whereas the main barrage did not suffer any damage. The lawsuit that followed this tragic event ended with a full acquittal of the dam's designers since the plaintiff experts succeeded in demonstrating that the collapse was due to an extreme rainfall storm of unpredictable intensity. The case was then officially closed and still today the failure of the Sella Zerbino dam is attributed to the unpredictable hydrological event. Recently, Natale and Petaccia (2013) re-examined the case assessing the capacity of the flood spillways which equipped the Bric Zerbino dam. This paper thoroughly reviews the mechanics of the collapse of the Sella Zerbino dam focusing on the stability of the structure. The water pressure underneath the dam and the poor quality of the foundation rock is believed to have played a major role in the sequence of events that ended in the collapse of the barrage.

  6. Characterization of colostrum from dams of BLV endemic dairy herds.

    Science.gov (United States)

    Gutiérrez, Gerónimo; Lomonaco, Marina; Alvarez, Irene; Fernandez, Fernando; Trono, Karina

    2015-06-12

    Bovine Leukemia Virus (BLV) is endemic in Argentina, where the individual prevalence is higher than 80% in dairy farms. The aim of this work was to find preliminary evidence to know if the high level of infection of the dam would implicate a higher challenge to her own offspring. We collected 65 sets of samples consisting of dam's blood and colostrum from two heavily infected dairy farms, and investigated the correlation between the dam's blood proviral load and the presence of provirus in colostrum. We also described the dual antibody/provirus profile in the colostrum. Provirus was detected in 69.23% of the colostrum samples, mostly from dams with a high proviral load, 36/45 (80%). Colostrum proviral load was significantly higher in dams with high blood proviral load (pcolostrum samples all along the antibody distribution, even in those with a low amount of antibodies. These results show that even when high blood proviral load dams offer higher levels of infected cells to their offspring through colostrum they also offer higher levels of protection of antibodies. On the contrary, low blood proviral load dams also offer infected cells but a poor content of antibodies, suggesting that these animals could play an important role in the epidemiological cycle of transmission.

  7. Safety of small and medium dams in permafrost regions

    Institute of Scientific and Technical Information of China (English)

    Rudolf V.Zhang; Sergey A.Velikin

    2014-01-01

    Safe operation and performance of dams is one of the key issues in permafrost regions. At present, the existing dams are 40 45 years old and they are reaching their design life limit. Intensive geocryological processes (thermokarst, thermal erosion, frost heaving, suffosion, concentrated seepage along the voids left by melt ice and others) begin to develop at the early stages of construction. These processes are even more intensive under severe climatic conditions of the permafrost zone due to the large thermal and moisture gradients and the resulting complex thermal stress strain state in the structures. Determining safety criteria is a critical and difficult task in dam safety management. The existing procedures need to be continuously refined and improved depending on dam importance class. Some researchers recommend introducing process development criteria (stability, destabilization, and extremality) for more objective assessment of dam safety, in addition to the existing two condition criteria. In other words, they call for a multi factor dam environment interaction system. A case study of safety declaration for an existing dam is presented.

  8. Deformation reinforcement theory and its application to high arch dams

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    In this paper,the deformation reinforcement theory(DRT) proposed by the authors is elaborated with a new definition of instability that an elasto-plastic structure is not stable if it cannot satisfy simultaneously equilibrium condition,kinematical admissibility and constitutive equations under the prescribed loading.Starting from the definition,a proof is established to the principle of minimum plastic complementary energy for failured structures.It is revealed that the principle of mini-mum plastic complementary energy results in relaxed constitutive equations,especially,yield conditions.It is demonstrated with case studies that many key issues in arch dam design,e.g.,global stability,dam-toe reinforcement,dam-toe cracking,dam-abut-ment reinforcement,can be well solved within the framework of the deformation reinforcement theory.The structural global stability can be described by the curve of the plastic complementary energy vs overloading factor.The unbalanced-forces obtained by elasto-plastic FEM can be used as the basis of analysis of global stability,dam-heel cracking,dam-toe anchorage and reinforcement of faults of high arch dams and their foundations.

  9. Minidoka Dam Wildlife Impact Assessment: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Meuleman, G. Allyn

    1989-03-01

    A wildlife impact assessment has been developed for the US Bureau of Reclamation's Minidoka Dam and Reservoir in south central Idaho. This assessment was conducted to fulfill requirements of the Fish and Wildlife Program. Specific objectives of this study included the following: select target wildlife species, and identify their current status and management goals; estimate the net effects on target wildlife species resulting from hydroelectric development and operation; recommend protection, mitigation, and enhancement goals for target wildlife species affected by hydroelectric development and operation; and consult and coordinate impact assessment activities with the Northwest Power Planning Council, Bonneville Power Administration, US Bureau of Reclamation, Bureau of Land Management, Shoshone-Bannock Tribes, US Fish and Wildlife Service, Pacific Northwest Utilities Conference Committee, and other entities expressing interest in the project. 62 refs., 2 figs., 11 tabs.

  10. Cardioprotective and renoprotective effects ofCocos nucifera water in offspring of high fat diet fed Wistar rat dams

    Institute of Scientific and Technical Information of China (English)

    Opeyemi Oreofe Akindele; Yinusa Raji

    2016-01-01

    Objective:To evaluate the effects ofCocos nucifera (C. nucifera) water on the cardiovascular and renal functions of offspring from rat dams fed high fat diet during gestation. Methods: Four groups of pregnant Wistar rats were treated from gestation day 1 to 21; namely, control (1 mL/100 g distilled water),C. nuciferawater (1 mL/100 gC. nuciferawater), high fat diet (1 mL/100 g distilled water + 30% butter: 70% standard rodent diet) and high fat diet +C. nuciferawater (1 mL/100 gC. nuciferawater + 30% butter: 70% standard rodent diet). All dams received standard rodent diet from gestation day 22, and offspring were weaned to standard rodent diet on postnatal day 28. On postnatal day 120, serum and cardiac levels of malondialdehyde, interleukin-1β and high sensitivity C-reactive protein were determined in offspring. Serum creatinine and urea levels as well as histology of heart and kidney tissue were assessed. Data were analyzed using One-wayANOVA andP Results: Male high fat diet offspring showed significantly increased (P Conclusions:C. nucifera water exerts cardioprotective and renoprotective effects on offspring of rat dams fed high fat diet during gestation via an anti-inflammatory mechanism.

  11. Risk Perception Analysis Related To Existing Dams In Italy

    Science.gov (United States)

    Solimene, Pellegrino

    2013-04-01

    In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned

  12. On monolithic stability and reinforcement analysis of high arch dams

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    Monolithic stability safety and reinforcement based on monolithic stability are very important for arch dam design.In this paper,the issue is addressed based on deformation reinforcement theory.In this approach,plastic complementary energy norm can be taken as safety Index for monolithic stability.According to deformation reinforcement theory,the areas where unbalanced force exists require reinforcement,and the required reinforcement forces are just the unbalanced forces with opposite direction.Results show that areas with unbalanced force mainly concentrate in dam-toes,dam-heels and faults.

  13. River turbidity and sediment loads during dam removal

    Science.gov (United States)

    Warrick, Jonathan A.; Duda, Jeffrey J.; Magirl, Christopher S.; Curran, Chris A.

    2012-01-01

    Dam decommissioning has become an important means for removing unsafe or obsolete dams and for restoring natural fluvial processes, including discharge regimes, sediment transport, and ecosystem connectivity [Doyle et al., 2003]. The largest dam-removal project in history began in September 2011 on the Elwha River of Washington State (Figure 1a). The project, which aims to restore the river ecosystem and increase imperiled salmon populations that once thrived there, provides a unique opportunity to better understand the implications of large-scale river restoration.

  14. Seismic rehabilitation and analysis of Chaohe earth dam

    Institute of Scientific and Technical Information of China (English)

    Lei Fu; Xiangwu Zeng

    2005-01-01

    Stability of earth dams during earthquakes has been a major concern for geotechnical engineers in seismic active regions. Liquefaction induced slope failure occurred at the upstream slope of a major earth dam in the suburb of Beijing, China, during the 1976 Tangshan Earthquake. The gravelly soil with loose initial condition liquefied under relatively small ground vibration. In recent years, a major seismic rehabilitation project was carried out on a similar earth dam nearby using dumped quarry stone. Seismic stability analysis was carried out using model test, finite element simulation, and pseudostatic slope stability program after taking into account the influence of excess pore pressure.

  15. Accuracy Analysis of a Dam Model from Drone Surveys

    OpenAIRE

    Elena Ridolfi; Giulia Buffi; Sara Venturi; Piergiorgio Manciola

    2017-01-01

    This paper investigates the accuracy of models obtained by drone surveys. To this end, this work analyzes how the placement of ground control points (GCPs) used to georeference the dense point cloud of a dam affects the resulting three-dimensional (3D) model. Images of a double arch masonry dam upstream face are acquired from drone survey and used to build the 3D model of the dam for vulnerability analysis purposes. However, there still remained the issue of understanding the real impact of a...

  16. The Effects of the Anti-Dam Movement on the Environmental Protection in American West

    Institute of Scientific and Technical Information of China (English)

    赵倩

    2009-01-01

    This paper examines the far - reaching influence of anti - dam movement on the protection of environment in the second half of the 20th century in American West. It first introduces the historical background of dams built along the Colorado Biver - the most important river in the West, especially the construction of Hoover Dam and Glen Canyon Dam. Then, the criticism of dams on the Colorado is examined with the emphasis on the anti - dam movement resulting from the awareness of the negative ecological impacts on the Colorado. In the conclusion, the author demonstrates the unparallel historical significance of the anti -dam movement in the en-vironmentalism in developing the American West.

  17. Lessons learned from Wenchuan earthquake for seismic safety of large dams

    Institute of Scientific and Technical Information of China (English)

    Chen Houqun

    2009-01-01

    This paper describes some special features of the Wenchuan earthquake that affected dam safety. Damage and performance of dams, primarily for four dams over 100 m high located in the affected earthquake area, are briefly described.Lessons learned related to dam safety from this devastating earthquake are preliminarily drawn. As the seismic safety of high dams during strong earthquakes has gained more attention around the world, some critical issues related to dam construction in China are considered and extensively discussed. Questions such as "Why is dam construction necessary in earthquake prone countries such as China?", "Can we accurately evaluate the seismic safety of high dams in China?", "Did reservoir impounding of the Zipingpu and Three Gorges Projects trigger the Wenchuan Earthquake in some way?" and "What is the strategic priority of dam safety for large dams in China?" are discussed. Finally, the corresponding tactics with response to the challenge are suggested and recent preliminary progress mainly achieved in IWHR is briefly introduced.

  18. Dam design can impede adaptive management of environmental flows: a case study from the Opuha Dam, New Zealand.

    Science.gov (United States)

    Lessard, JoAnna; Hicks, D Murray; Snelder, Ton H; Arscott, David B; Larned, Scott T; Booker, Doug; Suren, Alastair M

    2013-02-01

    The Opuha Dam was designed for water storage, hydropower, and to augment summer low flows. Following its commissioning in 1999, algal blooms (dominated first by Phormidium and later Didymosphenia geminata) downstream of the dam were attributed to the reduced frequency and magnitude of high-flow events. In this study, we used a 20-year monitoring dataset to quantify changes associated with the dam. We also studied the effectiveness of flushing flows to remove periphyton from the river bed. Following the completion of the dam, daily maximum flows downstream have exceeded 100 m(3) s(-1) only three times; two of these floods exceeded the pre-dam mean annual flood of 203 m(3) s(-1) (compared to 19 times >100 m(3) s(-1) and 6 times >203 m(3) s(-1) in the 8 years of record before the dam). Other changes downstream included increases in water temperature, bed armoring, frequency of algal blooms, and changes to the aquatic invertebrate community. Seven experimental flushing flows resulted in limited periphyton reductions. Flood wave attenuation, bed armoring, and a shortage of surface sand and gravel, likely limited the effectiveness of these moderate floods. Floods similar to pre-dam levels may be effective for control of periphyton downstream; however, flushing flows of that magnitude are not possible with the existing dam infrastructure. These results highlight the need for dams to be planned and built with the capacity to provide the natural range of flows for adaptive management, particularly high flows.

  19. Valentine’s Day

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    <正>February 14 is a day for people who have fallen in love.On this day, these men and women give gifts(presents) and cards to each other for Valentine’s Day(情人节). This day has been popular with people in love for a long time.At first,this holiday was called Lupercalia. Then the name of the day was changed to Saint Valentine’s Day.The man named Saint Valentine was killed on February 14,270 AD,because he was a Christian(基督教徒).

  20. The Distribution and Flux of Fish in the Forebay of The Dalles Dam in 2003

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Hanks, Michael E.; Zimmerman, Shon A.; Skalski, John R.; Dillingham, Peter W.

    2005-04-29

    In spring and summer 2003, the Pacific Northwest National Laboratory led a team that conducted mobile and fixed hydroacoustic surveys in the forebay of The Dalles Dam for the U.S. Army Corps of Engineers - Portland District, for the Anadromous Fish Evaluation Program. The surveys provided information on the distribution and movement of smolt-sized fish relative to ambient factors such as flow, bathymetry, or diel cycle in the forebay at The Dalles Dam. This information is intended to provide baseline data for the development of a surface bypass alternative for juvenile salmon at The Dalles Dam. We sampled the forebay of The Dallas Dam one day and night each week for six weeks in the spring and another six weeks in the summer. In general, during the day in the spring, the greatest densities of smolt-sized fish were observed in the thalweg of the main channel from the Washington bank, to the east side of the powerhouse, along the powerhouse, and concentrated in the areas next to the sluiceway. Fish density was lower on the Washington side of the river and west of mid-powerhouse (north spillway side). The spring night distribution was similar, with a few notable differences. The density of fish was high on the east side of the powerhouse and along the face of the powerhouse, and more fish were detected on the north spillway side. The distribution of sub-yearling sized fish in summer followed the same general patterns as spring, except that summer fish had a greater presence on the east side of the powerhouse and on the north spillway side. The vertical distribution of fish was also determined. In spring 80% of fish were above 5.6 m of depth during the day and above 4.7 m in the night. The summer fish were similarly distributed in the day and night with 80% of the fish in the upper 4.5 m and 4.7 m of the water column respectively. In general the smolt-sized fish were distributed deeper in the water column in the center of the channel than near the edges. The net

  1. National Dam Inspection Program. Converse Lake Dam (CT 00044). Connecticut Coastal Basin, Greenwich, Connecticut. Phase I Inspection Report.

    Science.gov (United States)

    1980-02-01

    Rosenstiel Estate. S-: f. Operator - Mr. Fredrick Jansen (Estate Superintendent) (203)661-9168 -’ .g. Purpose of Dam - Recreational - The dam was originally...cut from the downstream slope of the dam by Mr. Jansen , the estate superintendent. N 4.3 MAINTENANCE OF OPERATING FACILITIES ft There is no known...a bre in the blooi’pn.Ts cn o esosn ,71 ncut drainn theo lake or e;: v.atng7 oac C" t J C n o -2 alor A’J 1 Ian toWld that a considerable flow

  2. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature.

  3. Topographical, Geological and Geophysical Measurements in the Diamer Basha Dam Area (Gilgit-Balistan, Pakistan)

    Science.gov (United States)

    Poretti, Giorgio; Calligaris, Chiara; de Min, Gino; Tariq, Shahina; Kahn, Hawas; Zubair, Faqhia

    2010-05-01

    the whole length of the lake. The present study shows the preliminary results of an initial topographical survey of the dam's area realized within the framework of a larger monitoring project called "Nanga Parbat - Haramosh Massif Monitoring Project" the target of which is to determine the uplift of the massif due to geo-tectonic compressions. In fact northern Pakistan comprises three former distinct and previously separate plates named Karakoram, Kohistan island arc and Indian plates. They collided with each other during the Cretaceous-Tertiary ages and formed the present day configuration of this region (Himalayan orogeny) [3]. The project presented here was started in April of 2009 and developed through three different phases: a) Study of the area, contacts with the local authorities and identification of the points to be surveyed b) Monumentation of the benchmarks c) First measurement on the selected benchmarks. Since the location of the dam was very close to the Nanga Parbat-Haramosh massif It was decided to devote to it a special attention setting up a small topographical network. Three benchmarks were put on each bank (right and left) of the Indus river in order to measure the relative movements of the banks before and after the construction of the dam. The measurements were performed with a Leica TS30. Total Station following the scheme of the double parallelogram reproduced in Fig. 1 [3]. The measurements taken, before, during and after the construction of the dam will be a remarkable index of the change in the geophysical parameters produced by the dam and the related lake. References [1] http://www.paklinks.com/gs/pakistan-affairs/215216-president-musharraf-opens-work-diamer-basha-dam.html [2] http://www.defence.pk/forums/economy-development/12401-diamer-basha-dam-engineering-design-tender-documents-project-completed.html [3] http://www.dmi.units.it/~poretti/figureegubasha

  4. Day Care Centers

    Data.gov (United States)

    Department of Homeland Security — This database contains locations of day care centers for 50 states and Washington D.C. and Puerto Rico. The dataset only includes center based day care locations...

  5. Intelligent compaction theory of high roller compacted concrete dam

    Institute of Scientific and Technical Information of China (English)

    Liu Donghai

    2012-01-01

    The concept and realization process of intelligent compaction for the construction of high roller compacted concrete dam were presented, as well as the theory of monitoring and intelligent feedback control. Based on the real-time analysis of the compaction index, a multiple regression model of the dam compactness was established and a realime estimation method of compaction quality for the entire work area of roller compacted concrete dam was proposed finally. The adaptive adjustment of the roiling process parameters was achieved, with the speed, the exciting force, the roller pass and the compaction thickness meeting the standards during the whole construction process. As a result, the compaction quality and construction efficiency can be improved. The research provides a new way for the construction quality control of roller compacted concrete dam.

  6. Study on Rock Bolt Reinforcement for a Gravity Dam Foundation

    Science.gov (United States)

    Chen, S. H.; Yang, Z. M.; Wang, W. M.; Shahrour, I.

    2012-01-01

    In this article, the rock bolt reinforcement mechanism is discussed, and the gravity method as well as the finite element method for the bolted rock is presented. These methods are applied to study the gravity dam foundation of the Xiaoxi Hydropower Project, which is influenced by the presence of a large fault with a cracked zone over 180 m wide. Rock bolt reinforcement was used to improve the stability of the dam foundation, and the reinforcement parameters were determined from a semi-empirical equation controlled by in situ test. The stability analysis was conducted using the above methods, and the improvement in terms of deformation and stress as well as stability of the dam foundation due to the reinforcement is assessed. Rock bolt reinforcement was completed successfully, and the dam started normal operations in January 2008.

  7. Parallel computation of seismic analysis of high arch dam

    Institute of Scientific and Technical Information of China (English)

    Chen Houqun; Ma Huaifa; Tu Jin; Cheng Guangqing; Tang Juzhen

    2008-01-01

    Parallel computation programs are developed for three-dimensional meso-mechanics analysis of fully-graded dam concrete and seismic response analysis of high arch dams (ADs), based on the Parallel Finite Element Program Generator (PFEPG). The computational algorithms of the numerical simulation of the meso-structure of concrete specimens were studied. Taking into account damage evolution, static preload, strain rate effect, and the heterogeneity of the meso-structure of dam concrete, the fracture processes of damage evolution and configuration of the cracks can be directly simulated. In the seismic response analysis of ADs, all the following factors are involved, such as the nonlinear contact due to the opening and slipping of the contraction joints, energy dispersion of the far-field foundation, dynamic interactions of the dam-foundation-reservoir system, and the combining effects of seismic action with all static loads. The correctness, reliability and efficiency of the two parallel computational programs are verified with practical illustrations.

  8. Geologic and field investigations Dorris Dam Modoc National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report presents the results of a. geologic and field investigation of Dorris Dam performed to evaluate embankment and foundation conditions. The work included...

  9. Elwha Master Datafile - Elwha Dam Removal - Nearshore monitoring

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Removal of two dams on the Elwha River, Washington will help restore natural sediment processes to the coastal environment near the river mouth. We are interested in...

  10. FULCRUM - A dam safety management and alert system

    Energy Technology Data Exchange (ETDEWEB)

    Butt, Cameron; Greenaway, Graham [Knight Piesold Ltd., Vancouver, (Canada)

    2010-07-01

    Efficient management of instrumentation, monitoring and inspection data are the keys to safe performance and dam structure stability. This paper presented a data management system, FULCRUM, developed for dam safety management. FULCRUM is a secure web-based data management system which simplifies the process of data collection, processing and analysis of the information. The system was designed to organize and coordinate dam safety management requirements. Geotechnical instrumentation such as piezometers or inclinometers and operating data can be added to the database. Data from routine surveillance and engineering inspection can also be incorporated into the database. The system provides users with immediate access to historical and recent data. The integration of a GIS system allows for rapid assessment of the project site. Customisable alerting protocols can be set to identify and respond quickly to significant changes in operating conditions and potential impacts on dam safety.

  11. Will the Three Gorges Dam Stand The Test of Time?

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    After successfully containing the biggest flood this century, the Three Gorges Dam,on the upper reaches of the Yangtze River in central China’s Hubei Province, has encountered another flood, that of public opinion:Will this dam be able to hold floods that are "once-in-10,000-years" or "once-in-1,000-years" or "once-in-a-century"? Should numerous hazards this year, including land and mudslides and mountain torrents,be blamed on accumulation of sediment caused by the construction of the Three Gorges Dam? To get answers to these questions,journalists from Xinhua News Agency interviewed Cao Guangjing, Board Chairman of the China Three Gorges Corp., the operator of the Three Gorges Dam.

  12. Water quality of Flag Boshielo Dam, Olifants River, South Africa ...

    African Journals Online (AJOL)

    2013-07-24

    Jul 24, 2013 ... the dam wall coincided with the end of a drought that lasted .... was estimated by dividing the mean annual runoff by the res- ...... column was approximately holomictic. There was ... Alternatively, internal N loss associated with.

  13. Greenhouse gas emissions from Brazil’s Amazonian hydroelectric dams

    Science.gov (United States)

    Fearnside, Philip M.

    2016-01-01

    Tropical dams are often falsely portrayed as ‘clean’ emissions-free energy sources. The letter by de Faria et al (2015 Environ. Res. Lett. 10 124019) adds to evidence questioning this myth. Calculations are made for 18 dams that are planned or under construction in Brazilian Amazonia and show that emissions from storage hydroelectric dams would exceed those from electricity generation based on fossil fuels. Fossil fuels need not be the alternative, because Brazil has vast potential for wind and solar power as well as opportunities for energy conservation. Because dam-building is rapidly shifting to humid tropical areas, where emissions are higher than in other climatic zones, the impact of these emissions needs to be given proper weight in energy-policy decisions.

  14. Evaluating segregation in granular filters for earth dams

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, K. [Cambridge Univ., Cambridge (United Kingdom); Grabinsky, M. [Toronto Univ., ON (Canada)

    2003-07-01

    This paper presented some case studies to illustrate the relationship between seepage problems encountered with earth dams and segregation of the dams' granular filters during construction. A literature review of segregation mechanisms was presented along with a laboratory investigation. The case studies showed that the current understanding of the impact of a given degree of segregation is relatively poor. The literature reveals that although segregation mechanisms are identified and analyzed, very few are likely to be predominant during earth dam construction. Laboratory studies show that a mathematical relationship can be established between the filter's grain size distribution curve and the potential degree of segregation. Therefore, a mathematical relationship can also be established with the potential for adverse dam performance. The authors proposed a field procedure which allows for the monitoring of segregation during construction by contractors and engineers. It also helps in deciding whether any segregated zones require replacement. 5 refs., 7 figs.

  15. DESIGN OF SLIT DAMS FOR CONTROLLING STONY DEBRIS FLOWS

    Institute of Scientific and Technical Information of China (English)

    Hui-Pang LIEN

    2003-01-01

    A new method to a slit dam for controlling the stony debris flow has been derived based on the mass conservation law of the stony debris flow passing through a slit dam and the laboratory experiment results.This new method is then combined with three primary efficiency expressions: the dimensionless sediment outflow ratio,the sediment concentration ratio,and the sediment storage rate to develop a simple module,with which the height and the spacing of the posts,as well as the total spacing of slit dam are determined.Furthermore,these expressions can also be applied to check those slit dams that have already been constructed with their effectiveness against various magnitudes of the debris flow. The comparison between these expressions and laboratory data is in reasonable agreement.

  16. Is day surgery safe?

    DEFF Research Database (Denmark)

    Majholm, Birgitte; Engbæk, J; Bartholdy, Jens

    2012-01-01

    Day surgery is expanding in several countries, and it is important to collect information about quality. The aim of this study was to assess morbidity and unanticipated hospital visits 0-30 days post-operatively in a large cohort.......Day surgery is expanding in several countries, and it is important to collect information about quality. The aim of this study was to assess morbidity and unanticipated hospital visits 0-30 days post-operatively in a large cohort....

  17. Tehnical day: solar energy

    OpenAIRE

    Carli, Barbara

    2012-01-01

    This dissertation presents an example of planning and carrying out a technical activity day in the field of solar energy in primary school grades 7 and 9. Firstly, we briefly present technical activity days, the goals and criteria for the planning of technical days, and the topics and devices connected to the technical day in question and were needed in the execution of the experiments. We have selected four simple experiments in the field of solar energy and prepared the needed worksheets fo...

  18. Tailings dam-break flow - Analysis of sediment transport

    Science.gov (United States)

    Aleixo, Rui; Altinakar, Mustafa

    2015-04-01

    A common solution to store mining debris is to build tailings dams near the mining site. These dams are usually built with local materials such as mining debris and are more vulnerable than concrete dams (Rico et al. 2008). of The tailings and the pond water generally contain heavy metals and various toxic chemicals used in ore extraction. Thus, the release of tailings due to a dam-break can have severe ecological consequences in the environment. A tailings dam-break has many similarities with a common dam-break flow. It is highly transient and can be severely descructive. However, a significant difference is that the released sediment-water mixture will behave as a non-Newtonian flow. Existing numerical models used to simulate dam-break flows do not represent correctly the non-Newtonian behavior of tailings under a dam-break flow and may lead to unrealistic and incorrect results. The need for experiments to extract both qualitative and quantitative information regarding these flows is therefore real and actual. The present paper explores an existing experimental data base presented in Aleixo et al. (2014a,b) to further characterize the sediment transport under conditions of a severe transient flow and to extract quantitative information regarding sediment flow rate, sediment velocity, sediment-sediment interactions a among others. Different features of the flow are also described and analyzed in detail. The analysis is made by means of imaging techniques such as Particle Image Velocimetry and Particle Tracking Velocimetry that allow extracting not only the velocity field but the Lagrangian description of the sediments as well. An analysis of the results is presented and the limitations of the presented experimental approach are discussed. References Rico, M., Benito, G., Salgueiro, AR, Diez-Herrero, A. and Pereira, H.G. (2008) Reported tailings dam failures: A review of the European incidents in the worldwide context , Journal of Hazardous Materials, 152, 846

  19. Riparian Vegetation Encroachment Ratios in rivers below large Dams

    Science.gov (United States)

    Garcia de Jalón, Diego; Martínez-Fernández, Vanesa; González del Tánago, Marta

    2017-04-01

    Large Dams and reservoirs change the natural flow regime and consequently cause many alterations in riparian vegetation dynamics which may be assessed at different spatial and temporal scales. In Mediterranean regions flow regulation is frequently associated with irrigation. Regulated rivers with this purpose very often show reduced discharges during the wet season when the reservoir is being filled and increased discharges during the dry season when irrigation takes place. This type of regulation frequently promotes riparian vegetation growth as soil moisture levels are increased during summer when a natural drought would otherwise limit its growth. Additionally, flow regulation by large dams promotes the aging of late seral riparian vegetation reducing the frequency of flood disturbance and consequently, the potential recruitment of pioneer species. In this work we study the response of woody riparian vegetation to flow regulation by large dams in four rivers from Central Spain: Jarama, Manzanares, Guadalix and Alberche. The aim is to quantify the annual vegetation encroachment ratios and to develop a model to understand the main controlling factors, such as floodplain and channel traits; flow regulation intensity; type of regulation; present vegetation canopy; distance to the dam; and time since dam commissioning. A temporal comparison using aerial photographs from 1956, 1966, 1972, 1991, 2011 and 2014 was done in thirteen river reaches downstream from large dams, to evaluate their morphological evolution.. Floodplain dimensions and channel and riparian vegetation changes were assessed by comparing different pre-dam and post-dam conditions. Recent coloured photographs with 0.5 m spatial resolution and older black-and-white photographs at 1:33 000 spatial scale were supplied by the National Geographic Institute of Spain (www.ign.es) and the Statistical Institute (www.madrid.org/nomecalles/Inicio.icm) from Madrid Community. Similar visual scales were used to cope

  20. April Fools’ Day

    Institute of Scientific and Technical Information of China (English)

    Abby

    2009-01-01

    April Fools’ Day,the day when mischief-makers(恶作剧的人)are ever so indulged(纵容),falls on April 1 every year.On that day,various pranks(恶作剧)are played on one another,and everybody has to be

  1. A Day to Celebrate

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    Participating countries at the 2010 World Expo in Shanghai can choose a day as their National Pavilion Day.The day is usually celebrated with ceremonies and performances,which bring the nation’s culture and its character to life.

  2. Valentine’s Day

    Institute of Scientific and Technical Information of China (English)

    顾晓玲

    2009-01-01

    Valentine’s Day, which falls on February 14, is one of the most popular festivals of western society and even the whole world. It is a day for lovers, a day when people present chocolates, cards and candies to their beloved (心爱的人).

  3. Dam Inventory, Dams in 9 county region in South Georgia, Published in 2006, 1:2400 (1in=200ft) scale, Southern Georgia Regional Commission.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Dam Inventory dataset, published at 1:2400 (1in=200ft) scale, was produced all or in part from Field Survey/GPS information as of 2006. It is described as 'Dams...

  4. Emergy evaluation perspectives of a multipurpose dam proposal in Korea.

    Science.gov (United States)

    Kang, Daeseok; Park, Seok Soon

    2002-11-01

    The 'emergy' concept was used to evaluate the economy of Korea and the contributions of a multipurpose dam proposal to the real wealth of the Korean economy. Emergy is defined as the available energy of one kind previously used up directly and indirectly to make a product or service. The indices for Korea calculated from the emergy evaluation were close to those of developed countries. Even though its monetary balance of payments was negative in 1997, the economy of Korea showed positive balance in trade when exports and imports were expressed in emergy. The emergy evaluation showed that the Korean economy places a large stress on its environment. Water supply and generation of electricity were the most important contributions of the proposed dam in terms of emergy; 46.5 and 45.1% of the total benefit, respectively. Flood control contributed 8.4% of the total benefit. Major costs associated with the proposed dam were from sediments (33.2% of the total cost), construction services (22.8%), and social disruption of the region (21.6%). In terms of emergy, the ratio of benefits to costs of the proposed dam was 2.78 if sediments are not included, and 1.86 if sediments are included, which result in more benefits than costs in both cases. The benefit to cost ratio of the dam was larger than that of the current system (1.42) without the dam whether sediments are included in the total cost or not. The environmental stress of the proposed dam was considerably lower than that of the Korean economy, but the dam might increase stress on local environment.

  5. Liquefaction evaluation of dam foundation soils considering overlying structure

    OpenAIRE

    Gang Wang; Xing Wei; Hanlong Liu

    2015-01-01

    The liquefaction analysis procedure conducted at a dam foundation associated with a layer of liquefiable sand is presented. In this case, the effects of the overlying dam and an embedded diaphragm wall on liquefaction potential of foundation soils are considered. The analysis follows the stress-based approach which compares the earthquake-induced cyclic stresses with the cyclic resistance of the soil, and the cyclic resistance of the sand under complex stress condition is the key issue. Compr...

  6. The Changing Political Dynamics of Dam Building on the Mekong

    Directory of Open Access Journals (Sweden)

    Philip Hirsch

    2010-06-01

    Full Text Available This paper explores political dynamics surrounding dam building in the Mekong river basin, prior to, and following, the World Commission on Dams (WCD. Since the 1950s, dam building in the Mekong river basin has been enmeshed in a complex and shifting geopolitical and eco-political landscape. The broad geopolitical sweep of US hegemony, Cold War, regional rapprochement and the rise of China has been superimposed on eco-political shifts between modernist belief in progress as mastery over nature, concerns of global and national environmental movements over dams and their impacts, and a galvanised Mekong environmentalism. During the first decade of the 21st century, mainstream dams on the Lower Mekong have returned to the agenda after having almost disappeared in favour of tributary projects. The growing strength and assertiveness of regional economic players has fundamentally altered the context of energy demand, planning and investment. New sources of finance have relocated the points of political leverage. Environment has been mustered in favour of, as well as in opposition to, dam construction in the contexts of climate-change discourses, protected-area linkage with dam projects, and an industry push for sustainability protocols and certification. Despite the Mekong being one of its focal basins, WCD has not played a prominent role in this transformed arena, yet many of the social and environmental concerns, stakeholder-based processes and safeguard-oriented approaches to hydropower planning that WCD brought to the fore have persisted in the wider ethos of politics around dams in the region.

  7. Analysis of irreversible displacements of Daniel-Johnson dam

    Energy Technology Data Exchange (ETDEWEB)

    Chouinard, L.; Zhao, W. [McGill Univ., Montreal, PQ (Canada); Lariviere, R. [Hydro-Quebec, Montreal, PQ (Canada); Cote, P. [Hydro-Quebec Production, Baie-Comeau, PQ (Canada)

    2006-07-01

    Irreversible displacements in dams are associated with alkali-aggregate reaction, creep, and other damaging effects that compromise the safety of dams. An identification of the nature of irreversible displacements is needed to predict the future behaviour of dams as well as to select appropriate remedial measures. This paper provided details of a principal component analysis (PCA) used to investigate swelling and small irreversible displacements observed at the Daniel-Johnson dam in Quebec. PCA is a multivariate statistical method that performs the analysis of correlations or covariances between several random variables simultaneously. Three datasets were used: (1) reservoir water level; (2) air temperature; and (3) pendulum displacements. Standard linear regression analyses (HST) were performed for each variable in order to eliminate outliers and replace missing values. The multivariate dataset was then used to perform PCA on the entire dataset as well as on subsets from the original data. Displacement data from pendulums were used in the multivariate statistical analysis in which each component was treated as a separate variable. The comparison of irreversible displacements of the dam from HST analysis and principal component analysis (PCA) indicated that results were consistent with the data. The PCA analysis identified dominant patterns of behaviour and detected 2 distinct components of irreversible deformations arising from creep and swelling of concrete. Results of the study showed that the PCA analysis led to a better understanding of the overall behaviour of the dam and of individual arches and buttresses. It was concluded that the PCA analysis method will help to improve dam safety in addition to more accurately predicting the future behaviour of dams. 6 refs., 2 tabs., 9 figs.

  8. Phytoplankton composition of Sazlidere Dam lake, Istanbul, Turkey

    Directory of Open Access Journals (Sweden)

    Nese Yilmaz

    2013-05-01

    Full Text Available The phytoplankton composition of Sazlidere Dam lake was studied at 5 sampling sites between December 2003 - November 2005. A total of 67 taxa were recorded, representing Bacillariophyta (31, Chlorophyta (18, Cyanophyta (9, Chrysophyta (1, Cryptophyta (1, Dinophyta (3 and Euglenophyta (4. Bacillariophyta members constituted the dominant phytoplankton group in terms of species number. Nygaard’s compound index value and composition of phytoplankton indicate that the trophic state of Sazlidere Dam lake was changing from oligotrophic to mesotrophic.

  9. Water resource management in Japan: Forest management or dam reservoirs?

    Science.gov (United States)

    Komatsu, Hikaru; Kume, Tomonori; Otsuki, Kyoichi

    2010-01-01

    Researchers and journalists in Japan recently proposed forest management as an alternative to dam reservoir development for water resource management. To examine the validity of the proposal, we compared the potential low-flow increase due to forest clearcutting with the increase due to dam reservoir development. Here, we focused on forest clearcutting as an end member among various types of forest management. We first analyzed runoff data for five catchments and found a positive correlation between annual precipitation and the low-flow increase due to deforestation. We then examined the increase in low-flow rates due to dam reservoir development (dQ(d)) using inflow and outflow data for 45 dam reservoirs across Japan. Using the relationship between annual precipitation and the low-flow increase due to deforestation, we estimated the potential increase in the low-flow rate for each dam reservoir watershed if forests in the watershed were clearcut (dQ(f)). Only 6 of the 45 samples satisfied dQ(f)>dQ(d), indicating that the potential increase in the low-flow rate due to forest clearcutting was less than the increase due to dam reservoir development in most cases. Twenty-five of the 45 samples satisfied dQ(f)<0.2 dQ(d), indicating the potential increase in the low-flow rate due to forest clearcutting was less than 20% of the increase due to dam reservoir development in more than half the cases. Therefore, forest management is far less effective for water resource management than dam reservoir development is in Japan.

  10. Slimmed May Day Holiday

    Institute of Scientific and Technical Information of China (English)

    Liu Xinwen

    2008-01-01

    @@ Last November the State Council of China decided to renew its holiday system by reducing the seven-day Mav Dav holiday to three days and introducing three new one-day public holidays,namely the Qingming Festival,Dragon Boat Festival and Moon Festival.BY doing so,the three golden-week holidays that were introduced in 1999,namely the Spring Festival,Mav Dav and National Day,could be better distributed.The New Year's Eve holiday would remain one day.The new holiday plan was supposed to take effect in 2008.

  11. Seismic stability analysis of concrete gravity dams with penetrated cracks

    Directory of Open Access Journals (Sweden)

    Shou-yan JIANG

    2012-03-01

    Full Text Available The seismic stability of a cracked dam was examined in this study. Geometric nonlinearity and large deformations, as well as the contact condition at the crack site, were taken into consideration. The location of penetrated cracks was first identified using the concrete plastic-damage model based on the nonlinear finite element method (FEM. Then, the hard contact algorithm was used to simulate the crack interaction in the normal direction, and the Coloumb friction model was used to simulate the crack interaction in the tangential direction. After verification of numerical models through a case study, the seismic stability of the Koyna Dam with two types of penetrated cracks is discussed in detail with different seismic peak accelerations, and the collapse processes of the cracked dam are also presented. The results show that the stability of the dam with two types of penetrated cracks can be ensured in an earthquake with a magnitude of the original Koyna earthquake, and the cracked dam has a large earthquake-resistant margin. The failure processes of the cracked dam in strong earthquakes can be divided into two stages: the sliding stage and the overturning stage. The sliding stage ends near the peak acceleration, and the top block slides a long distance along the crack before the collapse occurs. The maximum sliding displacement of the top block will decrease with an increasing friction coefficient at the crack site.

  12. Back analysis of mechanical parameters of roller compacted concrete dam

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    In view of the diversity and complexity of mechanical parameters of roller compacted concrete dam(RCCD),the uniform design method,partial least-squares regression(PLS)and least squares support vector machine(LSSVM)were applied to the back analysis of RCCD with the use of the complex nonlinear relationship between dam mechanical parameters and dam displacements.During the process of back analysis,the initial samples of parameters were designed with uniform design method.Then,a transversely isotropic model of RCCD was established by MSC.Marc software.Through this model,training samples of LSSVM model could be obtained.And then,the complex nonlinear relationship between relative values of hydraulic components of dam displacements and mechanical parameters was established.Finally,actual relative values of dam hydraulic components are isolated from the measured data of dam displacements by using PLS.By inputting the isolated relative values into LSSVM model,the back analysis values of RCCD mechanical parameters can be obtained.The example analysis showed that mechanical parameters obtained by the above-mentioned back analysis method are reasonable,and the back analysis method is feasible.

  13. Assessment of some heavy elements in Galma dam, Zaria, Nigeria

    Directory of Open Access Journals (Sweden)

    Butu, A.W

    2013-06-01

    Full Text Available The study was carried out to assess the levels of concentration and distribution of Pb, Cr, Fe, Cd, Co, Ni, Zn and Cu in Galma dam, Zaria, Nigeria which spanned to 35Km. The main source of data was the surface water from the lower and the upper regions of the dam. The samples were collected and prepared in the laboratory according to standard method, Atomic Absorption Spectrophotometry (AAS technique was used to analyze the data. The results showed concentration of Pb, Cr, Fe, Cd, Co, Zn and Cu at various levels and the concentration of Ni below detectable level. The results also showed the distribution of these elements at lower and upper regions of Galma dam. The enrichment of these heavy elements in the dam could be explained by the loading of the dam with debris and effluents produced by various human activities within the dam catchment area through overland and base flows and the release of elements from geologic processes. The concentration of Pb, Cr and Fe were observed to be slightly above NIS and WHO standards for drinking water. To minimize pollution of the reserviour, it is strongly recommended that there should be reduction in levels of some unhealthy practices such as indiscriminate discharge of effluents like, engine oil, lubricants, used batteries, electric bulbs/fluorescent tubes, electronic and electrical appliances and high level use of chemicals on the farms are recommended to be discouraged.

  14. Assessing Otter Presence In Dams: A Methodological Proposal

    Directory of Open Access Journals (Sweden)

    Margarida Santos-Reis

    2009-10-01

    Full Text Available Standard otter survey methodology proposed by the IUCN Otter Specialist Group enables comparisons in present/absence data in different countries or in different regions. However, otter presence and distribution assessment in dry areas, such as the Mediterranean region, which are characterized by highly marked seasonal climate with intermittent water flow coupled with different types of habitats or systems such as dams, may gain from adjustment to the methodology. Pressure for dam building still occurs in these regions and the need for studies on ecological communities and species protection is increasing. Dams are very different from usual otter riverine habitat and we need to understand their influence on otter populations. Variation of dam location, reservoir characteristics and season will all influence spraint detectability. Environmental Impact Assessment Studies and ecological studies are frequently limited by both budget and time requiring field researchers to apply more efficient methodologies. Based on experience from studies conducted in Portugal we propose adjustments to the standard survey methodology (using spraints surveying otter presence in dams to be applied specifically to Mediterranean-type ecosystems. We define aspects to be considered regarding survey season, survey length and width, number and location of survey sites, among others. This paper will allow researchers to plan more effective field surveys based on standard otter survey methodology for the purpose of dam surveys, be that to detect otter presence/absence, a more in-depth comparative studies of otter presence, or simply improving the collecting of fresh spraints for molecular spraint analysis.

  15. The Social, Historical, and Institutional Contingencies of Dam Removal

    Science.gov (United States)

    Magilligan, F. J.; Sneddon, C. S.; Fox, C. A.

    2017-06-01

    Environmental managers in the United States and elsewhere are increasingly perceiving dam removal as a critical tool for river restoration and enhancing watershed resilience. In New England, over 125 dams have been dismantled for ecological and economic rationales. A surprising number of these removals, including many that are ongoing, have generated heated conflicts between restoration proponents and local communities who value their dammed landscapes. Using a comparative case study approach, we examine the environmental conflict around efforts to remove six dams in New England. Each of these removal efforts followed quite different paths and resultant outcomes: successful removal, stalled removal, and failure despite seemingly favorable institutional conditions. Lengthy conflicts often transpired in instances where removals occurred, but these were successfully arbitrated by paying attention to local historical-geographical conditions conducive to removal and by brokering effective compromises between dam owners and the various local actors and stakeholders involved in the removal process. Yet our results across all cases suggest that these are necessary, but not sufficient conditions for restoration through dam removal since a similar set of conditions typified cases where removals are continuously stalled or completely halted. Scholars examining the intersection between ecological restoration and environmental politics should remain vigilant in seeking patterns and generalities across cases of environmental conflict in order to promote important biophysical goals, but must also remain open to the ways in which those goals are thwarted and shaped by conflicts that are deeply contingent on historical-geographical conditions and broader institutional networks of power and influence.

  16. Ecosystem Response During the Removal of the Elwha River Dams

    Science.gov (United States)

    Pess, G. R.; McHenry, M.; Liermann, M. C.; Moses, R.; Denton, K.; McMillan, J.; Brenkman, S.; Duda, J.; Peters, R.; Anderson, J.; Quinn, T.

    2015-12-01

    Over the last century, the two dams blocked the upstream movement of anadromous fish to over 90% of the Elwha River watershed on the Olympic Peninsula of Washington State. These dams also restricted the downstream movement of sediment, wood, and other organic materials to the lower river and estuary. Populations of all Pacific salmon species and steelhead in the Elwha became critically low, habitat complexity decreased below the dams, and downstream coastal habitats became sediment starved. Simultaneous deconstruction of the two dams began in September 2011 was completed in September of 2014. The recent removal of the dams has been an opportunity to explore linkages among changes in sediment supply, salmonid populations, and ecosystem attributes. Preliminary findings focus on the delivery of millions of metric tonnes of sediment to the main river, its floodplain, and nearshore, the re-establishment of a natural wood delivery regime, the re-colonization of the upper watershed by anadromous fish, insights into functional relationships among salmonid populations and life history strategies, and the associated effects of all these elements on the aquatic and terrestrial foodwebs. This talk will provide an overview of the Elwha restoration project, and highlight recent changes observed during dam removal.

  17. The Social, Historical, and Institutional Contingencies of Dam Removal.

    Science.gov (United States)

    Magilligan, F J; Sneddon, C S; Fox, C A

    2017-02-25

    Environmental managers in the United States and elsewhere are increasingly perceiving dam removal as a critical tool for river restoration and enhancing watershed resilience. In New England, over 125 dams have been dismantled for ecological and economic rationales. A surprising number of these removals, including many that are ongoing, have generated heated conflicts between restoration proponents and local communities who value their dammed landscapes. Using a comparative case study approach, we examine the environmental conflict around efforts to remove six dams in New England. Each of these removal efforts followed quite different paths and resultant outcomes: successful removal, stalled removal, and failure despite seemingly favorable institutional conditions. Lengthy conflicts often transpired in instances where removals occurred, but these were successfully arbitrated by paying attention to local historical-geographical conditions conducive to removal and by brokering effective compromises between dam owners and the various local actors and stakeholders involved in the removal process. Yet our results across all cases suggest that these are necessary, but not sufficient conditions for restoration through dam removal since a similar set of conditions typified cases where removals are continuously stalled or completely halted. Scholars examining the intersection between ecological restoration and environmental politics should remain vigilant in seeking patterns and generalities across cases of environmental conflict in order to promote important biophysical goals, but must also remain open to the ways in which those goals are thwarted and shaped by conflicts that are deeply contingent on historical-geographical conditions and broader institutional networks of power and influence.

  18. Elwha River dam removal-Rebirth of a river

    Science.gov (United States)

    Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.

    2011-01-01

    After years of planning for the largest project of its kind, the Department of the Interior will begin removal of two dams on the Elwha River, Washington, in September 2011. For nearly 100 years, the Elwha and Glines Canyon Dams have disrupted natural processes, trapping sediment in the reservoirs and blocking fish migrations, which changed the ecology of the river downstream of the dams. All five Pacific salmon species and steelhead-historically present in large numbers-are locally extirpated or persist in critically low numbers. Upstream of the dams, more than 145 kilometers of pristine habitat, protected inside Olympic National Park, awaits the return of salmon populations. As the dams are removed during a 2-3 year project, some of the 19 million cubic meters of entrapped sediment will be carried downstream by the river in the largest controlled release of sediment into a river and marine waters in history. Understanding the changes to the river and coastal habitats, the fate of sediments, and the salmon recolonization of the Elwha River wilderness will provide useful information for society as future dam removals are considered.

  19. National Dam Safety Program. Woodridge Lake Dam (MO 11005), Mississippi - Kaskaskia - St. Louis Basin, Warren County, Missouri. Phase I Inspection Report.

    Science.gov (United States)

    1979-09-01

    KASKASKIA. ST. LOUIS BAS WOODRIDGE LAKE DAM WARREN COUNTY, MISSOURI MO 11005 (9) Final rept., DACW43-79-C.-#A)75 J (i) Sep 79 (10) Walter G. /Shifrin...Dam Inspection Report National Dam Safety Program Final Report Woodridge Lake Dam (MO 11005) 6. PERFORMING ORG. REPORT NUMBER Warren County, Missouri 7...Norvell Construction of 3320 Hermoso St., St. Louis, MO. After the structure was completed, a 2 inch water- line with a water faucet was installed on the

  20. Dam Mycobacterium avium subspecies parartuberculosis (MAP) infection status does not predetermine calves for future shedding when raised in a contaminated environment

    NARCIS (Netherlands)

    Eisenberg, S.W.F.; Rutten, Victor P.M.G.; Koets, A.P.

    2015-01-01

    Uptake of Mycobacterium avium subsp. paratuberculosis (MAP) by calves in the first days of life from colostrum, milk and faeces is regarded an important moment of transmission. The objective of this study was to quantify the
    association between the MAP status of dams as determined by the presenc

  1. Cardiac Cytochrome c Oxidase Activity and Contents of Submits 1 and 4 are Altered in Offspring by Low Prenatal Intake by Rat Dams

    Science.gov (United States)

    It has been reported previously that the offspring of rat dams consuming low dietary copper (Cu) during pregnancy and lactation experience a deficiency in cardiac cytochrome c oxidase (CCO) characterized by reduced catalytic activity and mitochondrial- and nuclear-subunit content after postnatal day...

  2. Prenatal copper deficiency in rat dams causes persistent reduction in nuclear-encoded cytochrome c oxidase subunits in cardiac mitochrondria of the first generation

    Science.gov (United States)

    Previous studies have shown that the offspring of rat dams having low copper (Cu) intake during pregnancy and lactation experience a deficiency in cardiac cytochrome c oxidase (CCO) after postnatal day 10. The present study was undertaken to determine the relative influences of pre-and postnatal Cu ...

  3. Effect of porcine circovirus type 2 (PCV2) vaccination of the dam on PCV2 replication in utero.

    Science.gov (United States)

    Madson, D M; Patterson, A R; Ramamoorthy, S; Pal, N; Meng, X J; Opriessnig, T

    2009-06-01

    The aims of this study were to determine if porcine circovirus type 2 (PCV2) vaccination of the dam is effective in preventing fetal PCV2 infection and reproductive failure. Twelve pregnant, PCV2-naïve sows were randomly divided into four groups, with three sows in each group. Group 1 sows served as noninoculated, nonvaccinated negative controls, group 2 sows were vaccinated with a commercially available PCV2 vaccine at 28 days of gestation and were not inoculated, group 3 sows were vaccinated at 28 days of gestation and inoculated with PCV2b at 56 days of gestation, and group 4 sows were inoculated with PCV2b but were not vaccinated. Serum samples from all sows were collected weekly throughout the gestation period, and sows were allowed to farrow naturally. At parturition, sow colostrum samples, presuckle serum samples, and tissues from the piglets were collected. Reproductive failure was not observed under the study conditions. PCV2 vaccination induced PCV2-specific immunoglobulin G and serum neutralizing antibodies in sows from groups 2 and 3 and prevented detectable PCV2 viremia in the dams after challenge. In group 3, PCV2 DNA was detected in colostrum samples, fetuses, and live-born pigs; however, microscopic lesions and PCV2-specific antigen were not present in any of the fetuses in this group. The results from this study indicate that vertical transmission of PCV2 can occur in PCV2-vaccinated dams.

  4. Dam failure analysis for the Lago de Matrullas Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Torres-Sierra, Heriberto; Gómez-Fragoso, Julieta

    2015-01-01

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed a hydrologic and hydraulic study to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago de Matrullas Dam, located within the headwaters of the Río Grande de Manatí. The hydrologic study yielded outflow hydrographs and peak discharges for Lago de Matrullas and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation (PMP) event, (2) a 24-hour PMP event, and (3) a 100-year-recurrence, 24-hour rainfall event. The hydraulic study simulated the hypothetical dam failure of Lago de Matrullas using hypothetical flood hydrographs generated from the hydrologic study and selected dam breach parameters. The flood wave resulting from the failure was downstream-routed through the lower reaches of the Río Matrullas, the Río Toro Negro, and the Río Grande de Manatí for determination of water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” (no precipitation) conditions. The Hydrologic Modeling System (HEC–HMS) and the River Analysis System (HEC–RAS) computer programs, developed by the Hydrologic Engineering Center (HEC) of the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was performed using the unsteady-state flow module available in the HEC–RAS model.

  5. Dam Inventory, diversion dams, Published in 2009, 1:24000 (1in=2000ft) scale, Washington County.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Dam Inventory dataset, published at 1:24000 (1in=2000ft) scale, was produced all or in part from Other information as of 2009. It is described as 'diversion...

  6. Qu'Appelle River Dam, dam break analysis using advanced GIS tools for rapid modelling and inundation mapping

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, D. [Hatch Energy, Winnipeg, MB (Canada); Campbell, C. [Saskatchewan Watershed Authority, Moose Jaw, SK (Canada); Groeneveld, J. [Hatch Energy, Calgary, AB (Canada)

    2008-07-01

    The South Saskatchewan River Project (SSRP) comprises a multi-purpose reservoir that provides water for conservation and irrigation, flood control, power generation, recreation, and municipal and industrial water supply. In addition to the 64 m high Gardiner Dam, the 27 m high Qu'Appelle River Dam and the 22 km long Lake Diefenbaker Reservoir, the SSRP also includes ancillary works. The Qu'Appelle River valley extends for 458 km before connecting to the Assiniboine River. The valley is incised up to 90 m in depth and is a popular cottaging and recreational area with several major communities located in the flood plain. In the event of a breach of the Qu'Appelle Dam, the discharge will increase from a normal maximum discharge of under 60 m{sup 3} per second to over 50,000 m{sup 3} per second. The Saskatchewan Watershed Authority (SWA) is responsible for ensuring safe development of the Province's water resources, without affecting reservoir or lake operations, and preventing damage from flooding, erosion or land slides. It is in the process of developing Hazard Assessments and emergency preparedness plans for each of their dams in accordance with the Canadian Dam Safety Guidelines. Studies using GIS technology and the hydrodynamic routing model HEC-RAS have been completed to evaluate the potential inundation that may result in the event of failure of the Qu'Appelle River Dam. These studies involved the development of a breach parameter model using a breach data set revised to better reflect the Qu'Appelle River Dam; the development of a dam break model for the Qu'Appelle River Dam and downstream river and flood plain; and, the use of this model to simulate two potential dam failure scenarios for the Qu'Appelle River Dam, notably failure during passage of the PMF and failure during fair weather conditions. Inundation maps have been prepared for the downstream Qu'Appelle River valley for each of the above events. 3 refs., 4

  7. Dam that social networking: connecting South Africa's major dams to social media

    CSIR Research Space (South Africa)

    Butgereit, L

    2011-10-01

    Full Text Available , embarrassingly so, a marital bed. 2. Research Question and Methodology The data provided by the South African Department of Water Affairs is excellent and accurate [4, 5]. Unfortunately, the majority of South Africans are not aware of the data which... provides a nice fly-in approach to viewing the Vaal Dam. The data provided in the description field of the KML is reproduced in the side bar. 5. Twitter All communication with Twitter was done via the Twitter4J library. Twitter4J is a Java...

  8. Review of revised Klamath River Total Maximum Daily Load models from Link River Dam to Keno Dam, Oregon

    Science.gov (United States)

    Rounds, Stewart A.; Sullivan, Annett B.

    2013-01-01

    Flow and water-quality models are being used to support the development of Total Maximum Daily Load (TMDL) plans for the Klamath River downstream of Upper Klamath Lake (UKL) in south-central Oregon. For riverine reaches, the RMA-2 and RMA-11 models were used, whereas the CE-QUAL-W2 model was used to simulate pooled reaches. The U.S. Geological Survey (USGS) was asked to review the most upstream of these models, from Link River Dam at the outlet of UKL downstream through the first pooled reach of the Klamath River from Lake Ewauna to Keno Dam. Previous versions of these models were reviewed in 2009 by USGS. Since that time, important revisions were made to correct several problems and address other issues. This review documents an assessment of the revised models, with emphasis on the model revisions and any remaining issues. The primary focus of this review is the 19.7-mile Lake Ewauna to Keno Dam reach of the Klamath River that was simulated with the CE-QUAL-W2 model. Water spends far more time in the Lake Ewauna to Keno Dam reach than in the 1-mile Link River reach that connects UKL to the Klamath River, and most of the critical reactions affecting water quality upstream of Keno Dam occur in that pooled reach. This model review includes assessments of years 2000 and 2002 current conditions scenarios, which were used to calibrate the model, as well as a natural conditions scenario that was used as the reference condition for the TMDL and was based on the 2000 flow conditions. The natural conditions scenario included the removal of Keno Dam, restoration of the Keno reef (a shallow spot that was removed when the dam was built), removal of all point-source inputs, and derivation of upstream boundary water-quality inputs from a previously developed UKL TMDL model. This review examined the details of the models, including model algorithms, parameter values, and boundary conditions; the review did not assess the draft Klamath River TMDL or the TMDL allocations

  9. National Program for Inspection of Non-Federal Dams. Nichols Pond Dam (VT 00184), Richelieu River Basin, Woodbury, Vermont. Phase I Inspection Report.

    Science.gov (United States)

    1980-04-01

    on pages B-12 through B-14. A letter report by ’fr. Barranco describes some of the history on page B-15. 3. Plans and sketches prepared by DuBois...Peter Barranco , Jr., P.E., Dam Safety Engineer I Subject: Nichols Pond Dam - Woodbury (252-1) The writer inspected subject dam, obtained dimensions and

  10. 5. decennial inspection of Tignes dam. Draining of the higher french dam; 5. inspection decennale du barrage de Tignes. Vidange du plus haut barrage de France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This document deals with the 5. decennial inspection of the Tignes dam. The Tignes dam has been drained to allow EDF and the public authorities to verify the dam wall, of 180 m high, in order to validate the next decade. The four steps of the drainage are described as the maintenance policy of such building. (A.L.B.)

  11. Simulation of the thermal behaviour of a concrete dam using in situ measurements : case of Daniel-Johnson dam

    Energy Technology Data Exchange (ETDEWEB)

    Thibeault, N. [Tecsult Inc., Montreal, PQ (Canada); Lariviere, R. [Hydro-Quebec, Montreal, PQ (Canada)

    2004-09-01

    The Daniel-Johnson Dam is the largest multiple-arch dam in the world. It was completed in 1969 at a height of 214 metres. The dam has faced many challenges related to severe thermal conditions, presence of plunging cracks in many arches and opening at the rock-concrete interface. Major concerns lie with the shear resistance in the plane of the plunging cracks. It has been determined that the main cause of arch degradation is related to the thermal behaviour of the dam. A thermal shelter was therefore constructed in the lower part of the arches. This protection has proved to be very effective. A decision was later taken to grout the plunging cracks of some arches. This involved the verification of the structural stability of the arch base. To accomplish this, the shear safety factor during the proposed injection had to be validated. This paper discussed the complex challenge of simulating the thermal behaviour of a concrete dam. It presented an alternative to the conventional methods to implement a thermal profile in a finite element model. Synthetic curves of the thermal profile were used for different thicknesses and boundary conditions. The curves were then interpolated for intermediate thicknesses. A numerical model developed for this project has been verified according to the recommendations of Bulletin 94 of ICOLD (Computer Software for Dams). The loads to consider within the framework study of the Daniel-Johnson Dam gravity; thermal gradient in summer and winter; thermal protection; hydrostatic pressure; uplift pressure in cracks; hydrostatic pressure at upstream on the grout curtain; rock-concrete contact opening; and grout pressures. The proposed method has proven to be simple, efficient and easily implemented to rapidly determine the thermal behaviour of the structures. It is also particularly well suited for multiple-arch dams. The thermal structure analysis was used to determine deformation which was compared with measurements of the pendulums. 8 refs

  12. Combating Poverty by Irrigation from Large Dams in Arid Countries: A Case Study of Minab Dam, Iran

    Directory of Open Access Journals (Sweden)

    ALI ASGHAR IRAJ POOR

    2010-10-01

    Full Text Available A set of indicators for sustainable development were identified to be employed in developing countries. The selected indicators provided a good understanding of social and engineering outputs of a water resources project. Results of the study revealed that there are significant positive impacts of dam construction but they were not same as the targeted objectives envisaged in the feasibility report of the project. It means that after construction of the dam and irrigation system, development didn?t match with the targeted goals of the project. This study argues the world-wide controversy against construction of dam in arid zone which is ill-founded and based on a few short term, mitigable negative impacts, ignoring many positive long term inputs alleviating chronic poverty in arid regions. The study meticulously looks into the pre dam bio-physical and socio-economic conditions in one of the arid region of Iran under the area commanded by Minab dam. This dam was constructed in Hormozgan province of Iran in 1983 and its irrigation system was completed in 1986 which was followed by progressive expansion of irrigated agriculture which almost doubled in year 2006. Literacy rate has increased from 41% (pre-project to 74% in 2006. Similarly, significant improvements were observed in health care, sanitation, education, and other disciplines.

  13. Case Study of the Chaq-Chaq Dam Failure: Parameter Estimation and Evaluation of Dam Breach Prediction Models

    Directory of Open Access Journals (Sweden)

    Dr. KawaZedanAbdulrahman

    2014-05-01

    Full Text Available On 4th of February, 2006 at about 10:00 pm.Chaq-Chaq dam failed due to overtopping. The fall of 131.2 mm of rain over a 24-hour period was recorded at Sulaimani metrological gage station, which is located about 7.5Kmsouth-east of the dam. As a result, the reservoir level rose, the dam has been overtopped and finally breached near the spillway at the right abutment. Fortunately no human lives loss nor important structure destruction were reporteddue to the dam failure. The aim of this paper is to estimate the flood hydrograph passing through Chaq-Chaq dam breach using measured breach geometry as input to unsteady option of HEC RAS 4.1.0 and calibrating the breach formation time to obtain the measured maximum water surface at Chaq-Chaq Bridge (1.36 km downstream of dam axis. In addition the recent breach prediction models were evaluated to check their accuracy in predicting the breach geometry, breach formation time and peak breach discharge.

  14. Geophysical evaluation of the Success Dam foundation, Porterville, California

    Science.gov (United States)

    Hunter, L.E.; Powers, M.H.; Haines, S.; Asch, T.; Burton, B.L.; Serafini, D.C.

    2006-01-01

    Success Dam is a zonedearth fill embankment located near Porterville, CA. Studies of Success Dam by the recent Dam Safety Assurance Program (DSAP) have demonstrated the potential for seismic instability and large deformation of the dam due to relatively low levels of earthquake shaking. The U.S. Army Corps of Engineers conducted several phases of investigations to determine the properties of the dam and its underlying foundation. Detailed engineering studies have been applied using a large number of analytical techniques to estimate the response of the dam and foundation system when subjected to earthquake loading. Although a large amount of data have been acquired, most are 'point' data from borings and results have to be extrapolated between the borings. Geophysical techniques were applied to image the subsurface to provide a better understanding of the spatial distribution of key units that potentially impact the stability. Geophysical investigations employing seismic refraction tomography, direct current (DC) resistivity, audio magnetotellurics (AMT) and self-potential (SP) were conducted across the location of the foundation of a new dam proposed to replace the existing one. Depth to bedrock and the occurrence of beds potentially susceptible to liquefaction were the focus of the investigations. Seismic refraction tomography offers a deep investigation of the foundation region and looks at compressional and shear properties of the material. Whereas resistivity surveys determines conductivity relationships in the shallow subsurface and can produce a relatively high-resolution image of geological units with different electrical properties. AMT was applied because it has the potential to look considerably deeper than the other methods, is useful for confirming depth to bedrock, and can be useful in identifying deep seated faults. SP is a passive electrical method that measures the electrical streaming potential in the subsurface that responds to the movement of

  15. Temporary Restoration of Bull Trout Passage at Albeni Falls Dam

    Energy Technology Data Exchange (ETDEWEB)

    Paluch, Mark; Scholz, Allan; McLellan, Holly [Eastern Washington University Department of Biology; Olson, Jason [Kalispel Tribe of Indians Natural Resources Department

    2009-07-13

    This study was designed to monitor movements of bull trout that were provided passage above Albeni Falls Dam, Pend Oreille River. Electrofishing and angling were used to collect bull trout below the dam. Tissue samples were collected from each bull trout and sent to the U. S. Fish and Wildlife Service Abernathy Fish Technology Center Conservation Genetics Lab, Washington. The DNA extracted from tissue samples were compared to a catalog of bull trout population DNA from the Priest River drainage, Lake Pend Oreille tributaries, and the Clark Fork drainage to determine the most probable tributary of origin. A combined acoustic radio or radio tag was implanted in each fish prior to being transported and released above the dam. Bull trout relocated above the dam were able to volitionally migrate into their natal tributary, drop back downstream, or migrate upstream to the next dam. A combination of stationary radio receiving stations and tracking via aircraft, boat, and vehicle were used to monitor the movement of tagged fish to determine if the spawning tributary it selected matched the tributary assigned from the genetic analysis. Seven bull trout were captured during electrofishing surveys in 2008. Of these seven, four were tagged and relocated above the dam. Two were tagged and left below the dam as part of a study monitoring movements below the dam. One was immature and too small at the time of capture to implant a tracking tag. All four fish released above the dam passed by stationary receivers stations leading into Lake Pend Oreille and no fish dropped back below the dam. One of the radio tags was recovered in the tributary corresponding with the results of the genetic test. Another fish was located in the vicinity of its assigned tributary, which was impassable due to low water discharge at its mouth. Two fish have not been located since entering the lake. Of these fish, one was immature and not expected to enter its natal tributary in the fall of 2008. The other

  16. General Rushes Open Days Day II

    CERN Multimedia

    2013-01-01

    General Footage during the Open Days 2013 (Day 2 -29/09/2013) Images: Antoine Nouel, Clément Sbaffe, Victor Prunier, David Guerazzi, Basile Manent, Réemi Richarme, Noemi Caraban 00:00:00 00:08:56 Interviews 00:08:56 00:20:47 ALICE 00:20:47 00:26:52 ATLAS 00:26:52 00:28:07 Workshops 00:28:07 00:33:13 Crystal Lab 00:33:13 00:44:19 Superconductivity 00:44:19 01:04:42 Cryogenics 01:04:42 01:12:39 Transports 01:12:39 01:16:30 LEIR 01:16:30 01:18:28 LMF 01:18:28 01:19:50 Vacuum 01:19:50 01:36:39 Superconducting magnets (F1) 01:36:39 01:46:06 The idea filled world of vacuum (F2) 01:46:06 01:49:55 CCC 01:49:55 01:52:41 Safety Training Center 01:52:41 01:55:00 COMPASS 01:55:00 02:09:19 Robotics 02:09:19 02:18:36 LHC Point 6 (with DG) 02:18:36 02:25:16 LHC Point 4 02:25:16 02:29:29 LHCb 02:29:29 02:33:12 Control Center 02:33:12 02:39:57 Streets

  17. Geomorphic response of the Sandy River, Oregon, to removal of Marmot Dam

    Science.gov (United States)

    Major, Jon J.; O'Connor, Jim E.; Podolak, Charles J.; Keith, Mackenzie K.; Grant, Gordon E.; Spicer, Kurt R.; Pittman, Smokey; Bragg, Heather M.; Wallick, J. Rose; Tanner, Dwight Q.; Rhode, Abagail; Wilcock, Peter R.

    2012-01-01

    The October 2007 breaching of a temporary cofferdam constructed during removal of the 15-meter (m)-tall Marmot Dam on the Sandy River, Oregon, triggered a rapid sequence of fluvial responses as ~730,000 cubic meters (m3) of sand and gravel filling the former reservoir became available to a high-gradient river. Using direct measurements of sediment transport, photogrammetry, airborne light detection and ranging (lidar) surveys, and, between transport events, repeat ground surveys of the reservoir reach and channel downstream, we monitored the erosion, transport, and deposition of this sediment in the hours, days, and months following breaching of the cofferdam. Rapid erosion of reservoir sediment led to exceptional suspended-sediment and bedload-sediment transport rates near the dam site, as well as to elevated transport rates at downstream measurement sites in the weeks and months after breaching. Measurements of sediment transport 0.4 kilometers (km) downstream of the dam site during and following breaching show a spike in the transport of fine suspended sediment within minutes after breaching, followed by high rates of suspended-load and bedload transport of sand. Significant transport of gravel bedload past the measurement site did not begin until 18 to 20 hours after breaching. For at least 7 months after breaching, bedload transport rates just below the dam site during high flows remained as much as 10 times above rates measured upstream of the dam site and farther downstream. The elevated sediment load was derived from eroded reservoir sediment, which began eroding when a meters-tall knickpoint migrated about 200 m upstream in the first hour after breaching. Rapid knickpoint migration triggered vertical incision and bank collapse in unconsolidated sand and gravel, leading to rapid channel widening. Over the following days and months, the knickpoint migrated upstream more slowly, simultaneously decreasing in height and becoming less distinct. Within 7 months

  18. ONE- AND TWO-DIMENSIONAL COUPLED HYDRODYNAMICS MODEL FOR DAM BREAK FLOW

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    1-D and 2-D mathematical models for dam break flow were established and verified with the measured data in laboratory. The 1-D and 2-D models were then coupled, and used to simulate the dam break flow from the reservoir tail to the dam site, the propagation of dam break waves in the downstream channel, and the submergence of dam break flow in the downstream town with the hydrodynamics method. As a numerical example, the presented model was employed to simulate dam break flow of a hydropower station under construction. In simulation, different dam-break durations, upstream flows and water levels in front of dam were considered, and these influencing factors of dam break flow were analyzed, which could be referenced in planning and designing hydropower stations.

  19. Open Day at SHMI.

    Science.gov (United States)

    Jarosova, M.

    2010-09-01

    During the World Meteorological Day there has been preparing "Open Day" at Slovak Hydrometeorological Institute. This event has more than 10 years traditions. "Open Day" is one of a lot of possibilities to give more information about meteorology, climatology, hydrology too to public. This "Day" is executed in whole Slovakia. People can visit the laboratories, the forecasting room....and meteo and clima measuring points. The most popular is visiting forecasting room. Visitors are interested in e.g. climatologic change in Slovakia territory, preparing weather forecasting, dangerous phenomena.... Every year we have more than 500 visitors.

  20. Microtremor response of the Cheongcheon dam in Korea

    Science.gov (United States)

    Kim, Ki Young; Park, Young-Gyu

    2016-04-01

    Microtremors were analysed using the reference-dependent horizontal spectral (H/H) method and the horizontal-to-vertical spectral ratio (H/V) method to estimate site effects of the Cheongcheon earthen dam in Korea. Seismic vibrations were recorded on the dam's crest, at the toe of the dam, and in a downstream borehole using three-component accelerometers. The H/H peaks for crest versus toe-of-dam accelerations occurred at 3.1, 6.7 and 13.1 Hz with ratios of 6.9, 11.4 and 8.9, respectively. The H/V peaks for the crest of the dam occurred at 3.0, 7.0 and 13.4 Hz with ratios of 6.7, 7.8 and 5.6, respectively. The peak near 3 Hz may correspond to depth to bedrock, whereas the other peaks at higher frequencies may reflect the geometrical effect of the dam or overtone responses to the thickness of dam fill overlying the clay core. For the toe data, from the H/V spectral ratio method, the basement boundary appeared as double peaks near 8 and 10 Hz with corresponding amplification factors of 5.2 and 6.2. These may indicate a gradual change in velocity across the basement boundary at ~10 m depth. The third resonance, which occurred at 15 Hz, may correlate with the refraction boundary at 5-6 m depth in the overburden layer. Both the frequencies and magnitudes of resonance derived from the H/H and H/V methods are reasonably well matched to the theoretical response curves computed by the reflection and transmission matrix and the two-dimensional finite difference methods.

  1. The behaviour of a large dam at severe frost

    Directory of Open Access Journals (Sweden)

    M. C. SPADEA

    1972-06-01

    Full Text Available Synthesizing the problem, the action of the thrusts in the
    behaviour of t h e dam of Pieve di Cadore, makes itself conspicuous expecially
    during three periods of the year:
    1. - About the end of June, the air temperature, 011 t h e average, overcomes
    the water one in the watershed upstream the dam: the bending of
    t h e dam upstream increases from the bottom to the top.
    2. - About the end of October, the thermal conditions change; the
    mean air temperature grows lower than the mean water temperature; the
    dam begins her bending dowstream.
    3. - When the air temperature is distinctly below 0 °C, the action of
    t h e t h r u s t s grows more complexe; t h e rocky waterlogged system downstream
    of t h e dam, while cooling, swells and pushes t h e bottom of t h e dam upstream;
    at t h e higher quote, on the contrary, the t h r u s t downstream continues.
    When the strenght limit of the medium is surpassed, arises a contrast
    between the rocky system and the concrete structure: this contrast can origin
    a t e very small fractures, revealed from seismic station installed into the
    central ashlar (XIV a t 660 metres height of t h e dam, under t h e form of microshocks
    which energy is of about 10I0-10U erg.

  2. Dam foundation excavation techniques in China:A review

    Institute of Scientific and Technical Information of China (English)

    Yuzhu Zhang; Wenbo Lu; Ming Chen; Peng Yan; Yingguo Hu

    2013-01-01

    A protective layer (PL) is commonly reserved above foundation surface to protect the underlying rock mass during dam foundation excavation. In China, the PL of dam foundation is conventionally subdivided into two or three thin layers and excavated with the shallow-hole blasting method, even by pneumatic pick method in case of soft rock mass. The aforementioned layered excavation of the PL delays the con-struction of the whole project. After nearly 30-year practices, several safe and efficient methods for the PL excavation of dam foundation are gradually developed. They include shallow-hole bench blasting with cushion material (SBC) at the bottom of the hole, and horizontal smooth blasting (HSB). The PL is even can-celled on the condition that horizontal pre-split technique is employed during dam foundation excavation. This paper introduces the aforementioned two PL excavation methods (shallow-hole blasting and bench blasting) and horizontal pre-split technique of dam foundation without protective layer (HPP). The basic principles of blasting method, blasting geometry, charge structure, drill-and-blast parameters of typical projects are examined. Meanwhile, the merits and limitations of each method are compared. Engineering practices in China show that HSB is basically the optimal method for dam foundation PL excavation in terms of foundation damage control and rapid construction. Some new problems for dam foundation PL excavation arising, such as strong unloading and relaxation phenomenon that encountered in the gorge region of southwest China, are needed to be addressed; and the corresponding countermeasures are discussed as well.

  3. General Rushes Open Days Day I

    CERN Multimedia

    2013-01-01

    General Footage during Open Days 2013 (Day 1 -28/09/2013) Images: Cameramen: Antoine Nouel, Clément Sbaffe, Victor Prunier, David Guerazzi, Basile Manent, Réemi Richarme, Noemi Caraban 00:00:00 00:03:40 Interviews 00:03:40 00:06:54 Beam Instrumentation 00:06:54 00:07:16 Globe 00:07:16 00:10:28 Microcosme 00:10:28 00:12:59 Lectures 00:12:59 00:27:52 Fun with physics 00:27:52 00:28:19 International Village 00:28:19 00:34:18 Fun Zone 00:34:18 00:47:50 ATLAS Surface 00:47:50 00:56:57 ATLAS underground 00:56:57 00:58:53 Detector technologies 00:58:53 01:04:39 CLIC 01:04:39 01:05:56 CMS surface 01:05:56 01:09:32 LINAC 2-3 01:09:32 01:15:29 LINAC 4 01:15:29 01:20:41 Computer Center 01:20:41 01:25:53 Clubs 01:25:53 01:31:49 Beam Instrumentation 01:31:49 01:35:27 Music Festival 01:35:27 01:37:31 SPS 01:37:31 01:46:13 CCC 01:46:13 01:48:24 Safety Trainig Center 01:48:24 01:52:38 COMPASS 01:52:38 01:56:09 EHN1 01:56:09 02:01:42 AMS 02:01:42 02:10:52 Robotics 02:10:52 02:22:48 LHC Point 4 02:22:48 02:23:48 Control Cent...

  4. Multibeam sonar (DIDSON) assessment of American shad (Alosa sapidissima) approaching a hydroelectric dam

    Science.gov (United States)

    Grote, Ann B.; Bailey, Michael M.; Zydlewski, Joseph; Hightower, Joseph E.

    2014-01-01

    We investigated the fish community approaching the Veazie Dam on the Penobscot River, Maine, prior to implementation of a major dam removal and river restoration project. Multibeam sonar (dual-frequency identification sonar, DIDSON) surveys were conducted continuously at the fishway entrance from May to July in 2011. A 5% subsample of DIDSON data contained 43 793 fish targets, the majority of which were of Excellent (15.7%) or Good (73.01%) observation quality. Excellent quality DIDSON targets (n = 6876) were apportioned by species using a Bayesian mixture model based on four known fork length distributions (river herring (alewife,Alosa psuedoharengus, and blueback herring, Alosa aestivalis), American shad, Alosa sapidissima) and two size classes (one sea-winter and multi-sea-winter) of Atlantic salmon (Salmo salar). 76.2% of targets were assigned to the American shad distribution; Atlantic salmon accounted for 15.64%, and river herring 8.16% of observed targets. Shad-sized (99.0%) and salmon-sized (99.3%) targets approached the fishway almost exclusively during the day, whereas river herring-sized targets were observed both during the day (51.1%) and at night (48.9%). This approach demonstrates how multibeam sonar imaging can be used to evaluate community composition and species-specific movement patterns in systems where there is little overlap in the length distributions of target species.

  5. Enhancement of wadi recharge using dams coupled with aquifer storage and recovery wells

    KAUST Repository

    Missimer, Thomas M. M.

    2014-06-25

    Wadi channel recharge to the underlying alluvial aquifer is naturally limited by the flashy nature of flood events, evapotranspiration losses of water from the vadose zone, and aquifer heterogeneity, particularly low vertical hydraulic conductivity. Anthropogenic lowering of the water table in many wadi aquifers has also reduced the potential recharge by increasing the thickness of the vadose zone, causing interflow water loss from surface emergence and evaporation. A method to enhance recharge is to slow the flow within wadi channels by placement of dam structures, thereby ponding water and increasing the vertical head gradient to create a more rapid rate of infiltration and percolation. Effectiveness of wadi dams to enhance aquifer recharge reduces over time due to mud deposition within the reservoir caused by storm events. Up to 80 % of the water in old wadi reservoirs is lost to free-surface evaporation before infiltration and recharge can occur. One method to maintain or increase the rate of recharge is to convey clean water by gravity flow from the reservoir down-gradient to artificially recharge the aquifer using existing wells. This type of system is a low-cost and low-energy recharge method which could greatly enhance groundwater storage in wadi aquifers. Modeling results show that existing wells could store up to 1,000 m3/day under gravity-feed conditions and up to 3,900 m3/day with the shut-in of the well to produce a pressurized system. © 2014 Springer-Verlag Berlin Heidelberg.

  6. Exposure to toluene and stress during pregnancy impairs pups' growth and dams' lactation.

    Science.gov (United States)

    Soberanes-Chávez, Paulina; López-Rubalcava, Carolina; de Gortari, Patricia; Cruz, Silvia L

    2013-01-01

    Inhalant misuse starts at an early age, and a large number of users are women in reproductive age. This study investigates whether exposure to toluene, a commonly misused solvent, alone or combined with restraint stress during pregnancy, produces adverse effects in pregnant mice and their offspring during lactation and adulthood. Pregnant animals were exposed to either 8000ppm toluene (30min/twice daily from gestational days 7-19), restraint stress (three times/day during the same gestation period) or both; control mice were only exposed to air. Our results show that toluene, stress and their combination reduced body weight gain in pregnant females without changing food consumption. In the offspring, all treatments resulted in low body weight at weaning, but with the toluene and stress combination this effect was seen from birth. Weight deficiency could not be attributed to poor maternal behavior during the first 3weeks of age, but to a reduction in pro-TRH mRNA expression in the hypothalamic paraventricular nucleus and serum prolactin levels in dams. After weaning, pups that were subjected to toluene and stress during gestation had lower body weight and ate less than control animals. In conclusion, the combined exposure to toluene and stress during pregnancy lead to more pronounced effects in dams and longer-lasting actions in pups than exposure to either toluene or stress. © 2013 Elsevier Inc. All rights reserved.

  7. RESEARCHES ON POSTPARTUM FEEDING AND ELIMINATION BEHAVIOR OF THE DAM-CALF COUPLE

    Directory of Open Access Journals (Sweden)

    I. TRIPON

    2013-12-01

    Full Text Available The aim of this paper was to measure the main aspects that characterize the feedingand elimination behavior of the dam-calf couple during the first week after calving.The experiments were carried out in winter on 5 dam-calf couples. During theexperiments the following feeding and elimination behavior aspects weredetermined: number of feeding periods, the length of feeding periods, number ofruminating periods, the length of ruminating periods, the number of drinkingperiods, number of defecations and urinations. Data was computed byANOVA/MANOVA. Results showed that the mother cows spent daily in average on aday 256.5 minutes for feeding and 306.8 minutes for ruminating. The cows drankwater 7.7 times per day. The calves suckled on average 4.4 times daily and thelength of a suckling period was 11.9 minutes. Mother cows defecated in average 6.4times daily and urinated on average 3 times a day.Key words: feeding behavior, elimination behavior

  8. Dams. Bulletin of the technical service of electric power and big dams; Barrages. Bulletin du service technique de l`energie electrique et des grands barrages

    Energy Technology Data Exchange (ETDEWEB)

    Davard, J.

    1997-12-31

    The Dams bulletin reports on technical news concerning big French dams in operation. This issue comprises 5 papers. Two of them are examples of granting problems which led to the dismantling of the dams of Kernansquillec (Cotes d`Armor, France) and Maisons-Rouges (Indre-et-Loire, France) for economical and environmental reasons. The 3 other papers concern the life of French dams (technical control reports of the French dams in operation), the activities of the control service (annual inspections, preparation of draining operations, renewing of granting), and some general information (organisation of competent authorities, colloquium reports, hydro-power production during the first quarter of 1997). (J.S.)

  9. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Khan, Fenton; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.; Skalski, John R.

    2006-06-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporated fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an “experiment” using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The

  10. Valentine's Day

    Institute of Scientific and Technical Information of China (English)

    顾晓玲

    2009-01-01

    Valentine’s Day,which falls on February14,is one of the most popular festivals of western society and even the whole world.It is a day for lovers,a day when people present chocolates,cards and can-dies to their beloved(心爱的人).

  11. Science Challenge Day

    Science.gov (United States)

    Siegel, Deborah

    2013-01-01

    Science fairs can be good motivators, but as extracurricular activities, they leave some students behind. However, by staging a Science Challenge Day at school, educators can involve all students in doing everything from choosing activities to judging projects. This article presents a model for running a successful Science Challenge Day. The…

  12. NO TOBACCO DAY

    CERN Multimedia

    Medical Service

    2002-01-01

    The CERN Medical Service is joining in with the world no tobacco day, which takes place on 31 May 2002. We encourage you to take this opportunity to stop smoking for good. Nurses and Doctors will be present on that day to give out information on methods to stop smoking and to assist you in your efforts.

  13. A Perfect Day

    Institute of Scientific and Technical Information of China (English)

    DOREMICHELUT

    2004-01-01

    THERE are days where not a thing goes wrong. There's not a glitch. Everything you expect happens, and then more comes along, not because you ask, but because it just does. It's the way life is supposed to be when life is perfect. Memory is what names that day perfect and analyzes it in order to create another, just like it.

  14. Large Dam Effects on Flow Regime and Hydraulic Parameters of river (Case study: Karkheh River, Downstream of Reservoir Dam

    Directory of Open Access Journals (Sweden)

    Farhang Azarang

    2017-06-01

    Full Text Available Introduction: The critical role of the rivers in supplying water for various needs of life has led to engineering identification of the hydraulic regime and flow condition of the rivers. Hydraulic structures such dams have inevitable effects on their downstream that should be well investigated. The reservoir dams are the most important hydraulic structures which are the cause of great changes in river flow conditions. Materials and Methods: In this research, an accurate assessment was performed to study the flow regime of Karkheh river at downstream of Karkheh Reservoir Dam as the largest dam in Middle East. Karkheh River is the third waterful river of Iran after Karun and Dez and the third longest river after the Karun and Sefidrud. The Karkheh Dam is a large reservoir dam built in Iran on the Karkheh River in 2000. The Karkheh Reservoir Dam is on the Karkheh River in the Northwestern Khouzestan Province, the closest city being Andimeshk to the east. The part of Karkheh River, which was studied in this research is located at downstream of Karkheh Reservoir Dam. This interval is approximately 94 km, which is located between PayePol and Abdolkhan hydrometric stations. In this research, 138 cross sections were used along Karkheh River. Distance of cross sections from each other was 680m in average. The efficient model of HEC-RAS has been utilized to simulate the Karkheh flow conditions before and after the reservoir dam construction using of hydrometric stations data included annually and monthly mean discharges, instantaneous maximum discharges, water surface profiles and etc. Three defined discharges had been chosen to simulate the Karkheh River flow; maximum defined discharge, mean defined discharge and minimum defined discharge. For each of these discharges values, HEC-RAS model was implemented as a steady flow of the Karkheh River at river reach of study. Water surface profiles of flow, hydraulic parameters and other results of flow regime in

  15. Effects of exposure of rat dams to 1-bromopropane during pregnancy and lactation on growth and sexual maturation of their offspring.

    Science.gov (United States)

    Furuhashi, Koichi; Kitoh, Junzoh; Tsukamura, Hiroko; Maeda, Kei-Ichiro; Wang, Hailan; Li, Weihua; Ichihara, Sahoko; Nakajima, Tamie; Ichihara, Gaku

    2006-07-25

    1-Bromopropane (1-BP) exhibits neuroreproductive toxicities in adult rats and humans. Here, we determined the effects of exposure of rat dams to 1-BP during pregnancy and lactation on the growth and sexual maturation of their offspring. In Experiment 1, 40 rats were exposed to 0, 100, 400 and 800ppm 1-BP during pregnancy and lactation for 8h/day. Ten rats that were not placed in chambers throughout the experiment served to observe the effect of separation of dams from offspring. In Experiment 2, three groups of 10 pregnant rats each were exposed to fresh air in three chambers and 10 other rats were exposed to 800ppm 1-BP during pregnancy and lactation for 8h/day. After delivery, offspring of the exposed and non-exposed dams were swapped so that they were nursed by the opposite dams. In Experiment 1, the survival rate and body weight of offspring were lower than the non-exposed in 1-BP dose-dependent manner. In Experiment 2, the survival rate and body weight of offspring (Group A) nursed by exposed dams and those (Group B) of exposed dams were significantly lower than non-exposed groups. The body weight of Group A was lower than that of Group B, although the two groups showed a significant equal decrease in the survival rate. The number of dead offspring from Group A was significantly higher. Our results indicate that exposure to 1-BP during pregnancy and lactation has comparable effects on survival rate, but exposure during lactation has a more adverse effect on growth of offspring than that during pregnancy. Moreover, exposure during lactation is associated with reduced early survival of third generation (F2) rats.

  16. Putting Roman Dams in Context: a Virtual Approach

    Science.gov (United States)

    Decker, M. J.; Du Vernay, J. P.; Mcleod, J. B.

    2017-08-01

    Water resources and management have become a critical global issue. During the half-millennium of its existence, the Roman Empire developed numerous strategies to cope with water management, from large-scale urban aqueduct systems, to industrial-scale water mills designed to cope with feeding growing city populations. Roman engineers encountered, adopted, and adapted indigenous hydraulic systems, and left lasting imprints on the landscape of the Mediterranean and temperate Western Europe by employing a range of water technologies. A recent academic study has enabled the identification of remains of and references to seventy-two dams from the Roman era, constructed in Spain between the 1st and 4th century AD. Such unique heritage, without comparisons in the Mediterranean makes Spain an emblematic case study for the analysis of Roman hydraulic engineering and water management policies. Fifty dams have been located and detailed. The twenty-two outstanding, although identified on the ground, have not been able to be acceptably characterized, due in some cases to their being ruins in a highly degraded state, others due to their being masked by repairs and reconstructions subsequent to the Roman era. A good example of such neglected dams is the buttress dam of Consuegra , in Toledo province (Castilla-La Mancha). Dating to the 3rd - 4th century AD, the Dam of Consuegra, on the basin of the Guadiana, with its over 600 metres length and 4,80 metres height, is a remarkable case of Roman engineering mastery. It had a retaining wall upstream, numerous buttresses and perhaps an embankment downstream, of which no remains are left. The application of 3D digital imaging technique to create a high quality virtual model of such monuments has proved to be successful especially for the study of the technological aspects related its construction. The case study of the Roman dam of Muel (Zaragoza) has shown, in fact, as best practices in digital archaeology can provide an original and

  17. 77 FR 37037 - Crown Hydro LLC; Notice of Initiation of Proceeding To Terminate License By Implied Surrender and...

    Science.gov (United States)

    2012-06-20

    ... located in the headrace canal adjacent to the U.S. Army Corps of Engineers (USACE) Lock and Dam and on... authorized project includes: A reconstructed upper canal and intake tunnel; a powerhouse located at the... MW; an existing tailrace tunnel and a reconstructed tailrace canal; and an underground...

  18. Geophysical investigation of seepage beneath an earthen dam.

    Science.gov (United States)

    Ikard, S J; Rittgers, J; Revil, A; Mooney, M A

    2015-01-01

    A hydrogeophysical survey is performed at small earthen dam that overlies a confined aquifer. The structure of the dam has not shown evidence of anomalous seepage internally or through the foundation prior to the survey. However, the surface topography is mounded in a localized zone 150 m downstream, and groundwater discharges from this zone periodically when the reservoir storage is maximum. We use self-potential and electrical resistivity tomography surveys with seismic refraction tomography to (1) determine what underlying hydrogeologic factors, if any, have contributed to the successful long-term operation of the dam without apparent indicators of anomalous seepage through its core and foundation; and (2) investigate the hydraulic connection between the reservoir and the seepage zone to determine whether there exists a potential for this success to be undermined. Geophysical data are informed by hydraulic and geotechnical borehole data. Seismic refraction tomography is performed to determine the geometry of the phreatic surface. The hydro-stratigraphy is mapped with the resistivity data and groundwater flow patterns are determined with self-potential data. A self-potential model is constructed to represent a perpendicular profile extending out from the maximum cross-section of the dam, and self-potential data are inverted to recover the groundwater velocity field. The groundwater flow pattern through the aquifer is controlled by the bedrock topography and a preferential flow pathway exists beneath the dam. It corresponds to a sandy-gravel layer connecting the reservoir to the downstream seepage zone.

  19. Applying Mechanistic Dam Breach Models to Historic Levee Breaches

    Directory of Open Access Journals (Sweden)

    Risher Paul

    2016-01-01

    Full Text Available Hurricane Katrina elevated levee risk in the US national consciousness, motivating agencies to assess and improve their levee risk assessment methodology. Accurate computation of the flood flow magnitude and timing associated with a levee breach remains one of the most difficult and uncertain components of levee risk analysis. Contemporary methods are largely empirical and approximate, introducing substantial uncertainty to the damage and life loss models. Levee breach progressions are often extrapolated to the final width and breach formation time based on limited experience with past breaches or using regression equations developed from a limited data base of dam failures. Physically based embankment erosion models could improve levee breach modeling. However, while several mechanistic embankment breach models are available, they were developed for dams. Several aspects of the levee breach problem are distinct, departing from dam breach assumptions. This study applies three embankments models developed for dam breach analysis (DL Breach, HR BREACH, and WinDAM C to historic levee breaches with observed (or inferred breach rates, assessing the limitations, and applicability of each model to the levee breach problem.

  20. A Method for Probabilistic Stability Analysis of Earth Dams

    Directory of Open Access Journals (Sweden)

    T. R. Mafioleti

    2016-01-01

    Full Text Available This paper proposes a new probabilistic methodology for analyzing the stability of Earth Dams, based on the technique of the First Order Reliability Method for Structural Reliability. Differently from others methodologies present in literature, the proposed method interprets the involved variables as random ones. So, three results are provided here: the Structural Reliability Index, the Probability of Rupture and the most probable values of the random variables for the occurrence of a dam break. In order to illustrate it, real data from a cross section of the Left Bank Earthfill Dam of Itaipu Hydroelectric Power Plant (IHPP, located on the city of Foz do Iguaçu, Paraná, Brazil were used. The numerical results achieved by the proposed methodology evidence that IHPP dam has currently good structural conditions, confirming that the safety procedures adopted in Itaipu Dam may be considered as appropriate. The use of the proposed method enables to complement the previously existing knowledge about the structural conditions, improving the process of risk management.

  1. That Rainy Day

    Institute of Scientific and Technical Information of China (English)

    吴洪

    2000-01-01

    Many things have happened since I began to remember things. Pleasant or sad, they've left some impressions on my mind. Some are fading from my memory while others are and will be remembered for ever as if they had happened yesterday, and the scene on that rainy day is just one of such memories. It was on July 7th, 1990, the first day of the 3-day college entrance examination. I got up early that morning, feeling so excited and nervous that I lost all my appetite. What's worse, it began raining, adding vexat...

  2. Dynamic probability evaluation of safety levels of earth-rockfill dams using Bayesian approach

    Institute of Scientific and Technical Information of China (English)

    Zi-wu FAN; Shu-hai JIANG; Ming ZHANG

    2009-01-01

    In order to accurately predict and control the aging process of dams, new information should be collected continuously to renew the quantitative evaluation of dam safety levels. Owing to the complex structural characteristics of dams, it is quite difficult to predict the time-varying factors affecting their safety levels. It is not feasible to employ dynamic reliability indices to evaluate the actual safety levels of dams. Based on the relevant regulations for dam safety classification in China, a dynamic probability description of dam safety levels was developed. Using the Bayesian approach and effective information mining, as well as real-time information, this study achieved more rational evaluation and prediction of dam safety levels. With the Bayesian expression of discrete stochastic variables, the a priori probabilities of the dam safety levels determined by experts were combined with the likelihood probability of the real-time check information, and the probability information for the evaluation of dam safety levels was renewed. The probability index was then applied to dam rehabilitation decision-making. This method helps reduce the difficulty and uncertainty of the evaluation of dam safety levels and complies with the current safe decision-making regulations for dams in China. It also enhances the application of current risk analysis methods for dam safety levels.

  3. Flood hydrology and dam-breach hydraulic analyses of five reservoirs in Colorado

    Science.gov (United States)

    Stevens, Michael R.; Hoogestraat, Galen K.

    2013-01-01

    The U.S. Department of Agriculture Forest Service has identified hazard concerns for areas downstream from five Colorado dams on Forest Service land. In 2009, the U.S. Geological Survey, in cooperation with the Forest Service, initiated a flood hydrology analysis to estimate the areal extent of potential downstream flood inundation and hazard to downstream life, property, and infrastructure if dam breach occurs. Readily available information was used for dam-breach assessments of five small Colorado reservoirs (Balman Reservoir, Crystal Lake, Manitou Park Lake, McGinnis Lake, and Million Reservoir) that are impounded by an earthen dam, and no new data were collected for hydraulic modeling. For each reservoir, two dam-breach scenarios were modeled: (1) the dam is overtopped but does not fail (break), and (2) the dam is overtopped and dam-break occurs. The dam-breach scenarios were modeled in response to the 100-year recurrence, 500-year recurrence, and the probable maximum precipitation, 24-hour duration rainstorms to predict downstream flooding. For each dam-breach and storm scenario, a flood inundation map was constructed to estimate the extent of flooding in areas of concern downstream from each dam. Simulation results of the dam-break scenarios were used to determine the hazard classification of the dam structure (high, significant, or low), which is primarily based on the potential for loss of life and property damage resulting from the predicted downstream flooding.

  4. Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rocklage, Stephen J.; Kellar, Dale S. (Nez Perce Tribe, Department of Fisheries Resource Management, ID)

    2005-07-01

    to McNary Dam ranged from 37.9% (36.0-40.0%) for Pittsburg Landing to 57.9% (53.0-62.8%) for Lyons Ferry Hatchery. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 6.3 river kilometers per day (rkm/d) for Big Canyon to 10.8 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 5.2 rkm/d for Lyons Ferry Hatchery to 10.9 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 13-17 days to Lower Granite Dam and 31-37 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from Pittsburg Landing, Big Canyon and Captain John Rapids, were all from April 26-27. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups were all from May 14-18. The median arrival date at McNary Dam was May 13 for Lyons Ferry Hatchery yearlings.

  5. Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rocklage, Stephen J.; Kellar, Dale S. (Nez Perce Tribe, Department of Fisheries Resource Management, ID)

    2005-07-01

    McNary Dam ranged from 65.8% (58.5-73.1%) for Lyons Ferry Hatchery to 84.0% (76.2-91.8%) for Captain John Rapids. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 10.1 river kilometers per day (rkm/d) for Captain John Rapids to 19.1 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 6.0 rkm/d for Lyons Ferry Hatchery to 17.3 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 9-10 days to Lower Granite Dam and 22-25 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from Pittsburg Landing, Big Canyon and Captain John Rapids, were all from April 21-22. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups were all from May 5-6. The median arrival date at McNary Dam was April 24 for Lyons Ferry Hatchery yearlings.

  6. Monitoring and Evaluation of Yearling Fall Chinook Salmon (Oncorhynchus tshawytscha) Released from Acclimation Facilities Upstream of Lower Granite Dam; 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rocklage, Stephen J.; Kellar, Dale S. (Nez Perce Tribe, Department of Fisheries Resource Management, ID)

    2005-07-01

    Pittsburg Landing to 1.23 at Captain John Rapids. Estimated survival (95% confidence interval) of PIT tagged yearlings from release to Lower Granite Dam ranged from 87.8% (82.1-93.4%) for Big Canyon Surplus to 94.1% (90.1-98.1%) for Captain John Rapids. Estimated survival from release to McNary Dam ranged from 58.7% (49.3-68.1%) for Big Canyon Surplus to 71.3% (60.1-82.5%) for Captain John Rapids. Median migration rates to Lower Granite Dam, based on all observations of PIT tagged yearlings from the FCAP facilities, ranged from 9.3 river kilometers per day (rkm/d) for Captain John Rapids to 18.7 rkm/d for Pittsburg Landing. Median migration rates to McNary Dam ranged from 9.0 rkm/d for Lyons Ferry Hatchery to 17.3 rkm/d for Pittsburg Landing. Median travel times from the FCAP facilities were about 7-10 days to Lower Granite Dam and 21-23 days to McNary Dam. Median arrival dates at Lower Granite Dam, based on all observations of PIT tagged yearling groups from the FCAP facilities, were all from April 23-25. The median arrival date for Big Canyon Surplus was May 4. Median arrival dates at McNary Dam for Pittsburg Landing, Big Canyon and Captain John Rapids groups were all from May 7-8. Median arrival dates at McNary Dam were May 17 for Big Canyon Surplus and April 26 for Lyons Ferry Hatchery.

  7. Modelling the impact of large dams on flows and hydropower production of the Sekong, Sesan and Srepok Rivers in the Mekong Basin

    Science.gov (United States)

    Piman, T.; Cochrane, T. A.; Arias, M. E.

    2013-12-01

    Water flow patterns in the Mekong River and its tributaries are changing due to water resources development, particularly as a result of on-going rapid hydropower development of tributaries for economic growth. Local communities and international observers are concerned that alterations of natural flow patterns will have great impacts on biodiversity, ecosystem services, food securing and livelihood in the basin. There is also concern that un-coordinated dam development will have an adverse impact on energy production potential of individual hydropower plants. Of immediate concern is the proposed hydropower development in the transboundary Srepok, Sesan and Srekong (3S) Basin, which contributes up to 20% of the Mekong's annual flows, has a large potential for energy production, and provides critical ecosystem services to local people and the downstream Tonle Sap Lake and the Mekong delta. To assess the magnitude of potential changes in flows and hydropower production, daily flows were simulated over 20 years (1986-2005) using the SWAT and HEC ResSim models for a range of dam development and operations scenarios. Simulations of all current and proposed hydropower development in the 3S basin (41 dams) using an operation scheme to maximize electricity production will increase average dry seasonal flows by 88.1% while average wet seasonal flows decrease by 24.7% when compared to the baseline (no dams) scenario, About 55% of dry season flows changes are caused by the seven largest proposed dams (Lower Srepok 3, Lower Srepok4, Lower Sesan 3, Lower Sesan and Srepok 2, Xekong 5, Xekong 4, and Xe Xou). The total active storage of the existing and ongoing hydropower projects is only 6,616 million m3 while the cumulative active storage of the seven large proposed dams is 17,679 million m3. The Lower Srepok 3 project causes the highest impact on seasonal flow changes. Average energy production of the existing and ongoing hydropower projects is 73.2 GWh/day. Additional benefits

  8. Developmental toxic effects in suckling pups of rats from dams treated with betamethasone

    Directory of Open Access Journals (Sweden)

    M. K. Shindala

    2009-01-01

    Full Text Available Suckling pups of rats from dams treated with betamethasone 0.3, 0.6, 1.2 mg/kg, i.p. given once daily for 10 consecutive days (first nursing period demonstrated in a dose – dependent manner significant decreased (P<0.05 the percentage of survival of the pups to weaning, body weight, index of development, whereas brain, heart, kindey, lung,liver / body weight ratio significantly increased (P<0.05 as well as delays in physical maturation (ear opening, fur development, tooth eruption, eye opening in the pups. Swimming scores on postnatal day 9, 13, 15, 17, 20 was significantly decreased (P<0.05 in offspring from mothers treated with betamethasone 1.2 mg/kg, i.p. In conclusion, the results suggest that betamethasone induced developmental toxic effects in suckling pups exposed to its through the milk.

  9. Days of Rock

    Institute of Scientific and Technical Information of China (English)

    YUAN

    2004-01-01

    FROM last October 1 st to 3rd, at the foot of Fragrant Hill, a suburban Beijing resort famous for its flaming maple leaves in autumn, more than 20,000 rock fans indulged themselves in music for three days.

  10. My Happiest Day

    Institute of Scientific and Technical Information of China (English)

    姚晶晶; 万正芬

    2002-01-01

    Yesterday I was fourteen years old. Of course, it was my birlhday. My parents were both at home, I wanted to have o birthday party, so they helped me get everything ready for the biilhday the day before yesterday.

  11. Adult Day Services

    Science.gov (United States)

    ... the National Adult Day Services Association. 2. U.S. Health Care Costs: Background Brief , The Henry J. Kaiser Family Foundation (2008) (www.kaiseredu.org); excerpt from Nursing Homes and Assisted Living Industry Profile , First Research ( ...

  12. Gorkha earthquake-induced landslides and dammed lakes: Evolution and outburst modeling

    Science.gov (United States)

    Shugar, D. H.; Immerzeel, W.; Wanders, N.; Kargel, J. S.; Leonard, G. J.; Haritashya, U. K.; Collins, B. D.

    2015-12-01

    On 25 April 2015, the Gorkha Earthquake (Mw 7.8) struck Nepal, generating thousands of landslides in Nepal, Tibet (China), and India. While the majority of these hazards were triggered co-seismically, many are considered secondary effects occurring during the weeks following the main shock, based on high-resolution WorldView satellite imagery. Here we report on a series of shallow, post-seismic landslides into the upper Marsyangdi River in the Annapurna region of the central Nepal Himalayas. These landslides constricted and blocked the river, causing impoundments that presented acute flood risks to communities downstream. On April 27, two days following the main shock, ~4.7 x 104 m3 of water was impounded behind a series of small constrictions. By May 28, the total volume of impounded water had increased to ~6.4 x 105 m3. The downstream flood risk was especially significant in the event of a domino-like cascade of dam breaches. We examine the timing, distribution and evolution of the landslide-dammed lakes and quantify the risk of inundation-scenarios to downstream communities with a hydrological model. The model uses a fully kinematic wave simulation at a 30 m-spatial and 2 sec-temporal resolution to resolve the height, timing and volume of a possible outburst flood wave. Our modeling shows that a rapid dam burst involving only the lowest, largest lake would increase water levels at the nearest village of Lower Pisang ~2 km downstream by >7m in a matter of minutes. Approximately 70 km downstream, the flood wave would be mostly attenuated, raising water levels only tens of centimeters. Fortunately, at the time of writing, no flood had occurred.

  13. Downstream Migration of Masu Salmon Smolt at a Diversion Facility of Dam

    Science.gov (United States)

    Hayashida, K.; Nii, H.; Kasuga, K.; Watanabe, K.

    2014-12-01

    A diversion facility was installed on the upstream of Pirika Dam in Northern Japan that produced a downstream flow into the fishway, thus allowing the fish to migrate to the sea. On the other hand, if the flow rate in the river was more than 7.00 m 3/s (design flow rate of diversion facility), masu salmon smolt were concerned about accessing the dam reservoir, because the smolt can't migrate to the sea through the diversion facility unfortunately. Therefore, the downstream migration of smolt was investigated around the diversion facility. The PIT tag system and radio transmitters as the biotelemetry were used to determine 1) whether masu salmon smolt were able to migrate downstream through the diversion facility and fishway at Pirika Dam, 2) when the smolt started to migrate downstream, 3) whether the downstream migration of smolt were affected by the flow increase in the river. It was clarified that 88% of the smolt were able to enter the diversion facility, and then 81% of the smolt were able to access the fishway. It was also clarified that smolt downstream migration had two peaks in a day (5:00 and 18:00). During the study period, although the flow rate was in the 2.21 m3/s to 30.44 m3/s range (average 6.70 m3/s), it was revealed that the diversion facility has a satisfactory function for the downstream migration of smolt as presented above. The survey clarified the downstream migration behavior of masu salmon by using two types of biotelemetry equipment. PIT tag and radio transmitter were found to be very effective in tracking the behavior of small fish such as smolt. PIT tags, in particular, require very little operating cost, because once they are inserted in the fish, they do not need human labor for tracking. It is desirable to actively introduce the biotelemetry as tracking equipment when surveying the fish migration in the river.

  14. Open Day: General Information

    CERN Multimedia

    2004-01-01

    http://www.cern.ch/cern50/ With 50 visit points, including theatre performances, debates and visits to installations that have never before been opened to the public, CERN's 50th anniversary Open Day is set to be a day to remember. Seven hundred volunteers have signed up to help for the day. The Open Day team truly appreciates this wonderful show of support! The Open Day would not be possible without their help. Car parking and Access Cars with a CERN sticker can access all CERN sites as normal. However, to avoid congestion on Meyrin site, we ask you to park in areas that will not be open to the public (see below) and to use the shuttle services wherever possible for your transport during the day. Private cars on the French side of the border without a CERN sticker will be diverted to a car park area in the Prévessin site. There is a shuttle service connecting the Meyrin and Prévessin sites via SM18 every 20 minutes. Private cars on the Swiss side of the border without a CERN sticker will be diverte...

  15. Sun-Earth Days

    Science.gov (United States)

    Thieman, J.; Ng, C.; Lewis, E.; Cline, T.

    2010-08-01

    Sun-Earth Day is a well-coordinated series of programs, resources and events under a unique yearly theme highlighting the fundamentals of heliophysics research and missions. A menu of activities, conducted throughout the year, inspire and educate participants. Sun-Earth Day itself can vary in date, but usually is identified by a celebration on or near the spring equinox. Through the Sun-Earth Day framework we have been able to offer a series of coordinated events that promote and highlight the Sun, its connection to Earth and the other planets. Sun-Earth Day events are hosted by educators, museums, amateur astronomers and scientists and occur at schools, community groups, parks, planetaria and science centers around the globe. Sun-Earth Day raises the awareness and knowledge of formal and informal education audiences concerning space weather and heliophysics. By building on the success of Sun-Earth Day yearly celebrations, we seek to affect people of all backgrounds and ages with the wonders of heliophysics science, discovery, and exploration in ways that are both tangible and meaningful to their lives.

  16. An extended day program

    Directory of Open Access Journals (Sweden)

    Ševkušić-Mandić Slavica G.

    2002-01-01

    Full Text Available The paper presents the results of a pilot project evaluation, carried out as an action investigation whose aim was to provide a better quality extended day for primary school students. The project included the training of teachers involved in extended day program, designing of special activities performed by teachers with children once a week as well as changes and equipping of premises where children stay. The aims of the program were conception and performance of activities in a less formal way than during regular instructional days, linking of learning at school and acquired knowledge to everyday experiences, and work on contents contributing to the development of child's interests and creativity. The program was accomplished in a Belgrade primary school during the 2001/2002 academic year, comprising students of 1st and 2nd grades (N=77. The effects of the program were monitored throughout the academic year (observation and teachers' reports on accomplished workshops and at the end of the academic year (teachers and students' opinions of the program, academic achievement and creativity of students attending the extended day program compared with students not attending it. Findings about positive effects of the program on students' broadening of interests and willingness to express themselves creatively, indicate unequivocally that there is a need for developing special extended day programs. The extended day program is an opportunity for school to exert greater educational influence that has yet to be tapped.

  17. Vortices in dam reservoir: A case study of Karun III dam

    Indian Academy of Sciences (India)

    Maryam Azarpira; Hamed Sarkardeh; Sasan Tavakkol; Reza Roshan; Hossein Bakhshi

    2014-10-01

    The present study focuses on the effect of vortex formation on plane velocities in a reservoir. Velocity measurements are performed in the hydraulic model of Karun III dam and hydropower plant. Different vortices were produced at the horizontal intake by changing the submerged depth. Tangential velocities were measured on a rectangular mesh in the reservoir. The results were then processed to plot the contour lines of the plane velocities and study the effect of vortex formation on the flow condition in the reservoir. Contour lines in different submerged depths show that circulation zones are formed in different potential locations over the intakes causing vortex formation. These results were correlated with the location of the appearing vortices observed in the experiments. Experimental data of this study could be useful for numerical modelling of vortex in the reservoirs.

  18. Sediment trapping by dams creates methane emission hot spots

    DEFF Research Database (Denmark)

    Maeck, A.; Delsontro, T.; McGinnis, Daniel F.

    2013-01-01

    Inland waters transport and transform substantial amounts of carbon and account for similar to 18% of global methane emissions. Large reservoirs with higher areal methane release rates than natural waters contribute significantly to freshwater emissions. However, there are millions of small dams...... worldwide that receive and trap high loads of organic carbon and can therefore potentially emit significant amounts of methane to the atmosphere. We evaluated the effect of damming on methane emissions in a central European impounded river. Direct comparison of riverine and reservoir reaches, where...... sedimentation in the latter is increased due to trapping by dams, revealed that the reservoir reaches are the major source of methane emissions (similar to 0.23 mmol CH4 m(-2) d(-1) vs similar to 19.7 mmol CH4 m(-2) d(-1), respectively) and that areal emission rates far exceed previous estimates for temperate...

  19. Social Discounting of Large Dams with Climate Change Uncertainty

    Directory of Open Access Journals (Sweden)

    Marc Jeuland

    2010-06-01

    This paper reviews the recent discounting controversy and examines its implications for the appraisal of an illustrative hydropower project in Ethiopia. The analysis uses an integrated hydro-economic model that accounts for how the dam’s transboundary impacts vary with climate change. The real value of the dam is found to be highly sensitive to assumptions about future economic growth. The argument for investment is weakest under conditions of robust global economic growth, particularly if these coincide with unfavourable hydrological or development factors related to the project. If however long-term growth is reduced, the value of the dam tends to increase. There may also be distributional or local arguments favouring investment, if growth in the investment region lags behind that of the rest of the globe. In such circumstances, a large dam can be seen as a form of insurance that protects future vulnerable generations against the possibility of macroeconomic instability or climate shocks.

  20. Roles for Dam methylation in bacterial chromosome replication

    DEFF Research Database (Denmark)

    Charbon, Godefroid; Koch, Birgit; Skovgaard, Ole;

    GATC sequences in the DNA of Escherichia coli and related species are methylated at the adenine residue by DNA adenine methyltransferase (DamMT). These methylated residues and/or the level of DamMT influence initiation of chromosome replication from the replication origin, oriC, which contain...... an over-representation of GATC sites, in at least two ways. First, full methylation of oriC promotes duplex opening and hence certain oriC mutants are dependent on Dam methylation for initiation. Second, newly replicated and hemimethylated origins, are bound by SeqA (‘sequestered’) and remain inactive...... for initiation is not affected by additional SeqA whereas DnaA binding to sites outside the origin is inhibited by increased sequestration and/or hemimethylation....

  1. EXAMINATION AND TESTING OF CRANE BEAMS OF AN OVERFLOW DAM

    Directory of Open Access Journals (Sweden)

    Kholopov Igor' Serafimovich

    2012-10-01

    Full Text Available The following conclusions were made upon completion of the testing of crane beams: The lowest rigidity is demonstrated by welded beams exposed to temporary mobile loads; the maximal buckling caused by temporary mobile loads is equal to 12 mm, or 1/1,1790 of the span; the rigidity of crane beams of an overflow dam meets the requirements set by Section E2.1 of Construction Rules 20.13330.2011 "Loads and Actions". In general, the authors state that the crane beams of the span structure of the overflow dam are in a serviceable operating condition, according to their opinion issued upon completion of examination and testing procedures. The recommendation is to regularly tighten screw nuts and to install high-strength bolts in the points of missing rivets. The authors also recommend applying a rust-proofing coating to all metal structures of the dam spans.

  2. A Hidden-Removal Model of Dam Perspective Drawing

    Institute of Scientific and Technical Information of China (English)

    WANG Zi-ru; ZHOU Hui-cheng; LI Ming-qiu

    2011-01-01

    Aming at water conservancy project visualization, a hidden-removal method of dam perspective drawings is realized by building a hidden-removal mathematical model for overlapping points location to set up the hidden relationship among point and plane, plane and plane in space. On this basis, as an example of panel rockfill dam, a dam hidden-removal perspective drawing is generated in different directions and different visual angles through adapting VC++ and OpenGL visualizing technology. The results show that the data construction of the model is simple which can overcome the disadvantages of considerable and complicated calculation. This method also provides the new means to draw hidden-removal perspective drawings for those landforms and ground objects.

  3. Environmental Risk Assessment System for Phosphogypsum Tailing Dams

    Directory of Open Access Journals (Sweden)

    Xin Sun

    2013-01-01

    Full Text Available This paper may be of particular interest to the readers as it provides a new environmental risk assessment system for phosphogypsum tailing dams. In this paper, we studied the phosphogypsum tailing dams which include characteristics of the pollution source, environmental risk characteristics and evaluation requirements to identify the applicable environmental risk assessment methods. Two analytical methods, that is, the analytic hierarchy process (AHP and fuzzy logic, were used to handle the complexity of the environmental and nonquantitative data. Using our assessment method, different risk factors can be ranked according to their contributions to the environmental risk, thereby allowing the calculation of their relative priorities during decision making. Thus, environmental decision-makers can use this approach to develop alternative management strategies for proposed, ongoing, and completed PG tailing dams.

  4. Environmental risk assessment system for phosphogypsum tailing dams.

    Science.gov (United States)

    Sun, Xin; Ning, Ping; Tang, Xiaolong; Yi, Honghong; Li, Kai; Zhou, Lianbi; Xu, Xianmang

    2013-01-01

    This paper may be of particular interest to the readers as it provides a new environmental risk assessment system for phosphogypsum tailing dams. In this paper, we studied the phosphogypsum tailing dams which include characteristics of the pollution source, environmental risk characteristics and evaluation requirements to identify the applicable environmental risk assessment methods. Two analytical methods, that is, the analytic hierarchy process (AHP) and fuzzy logic, were used to handle the complexity of the environmental and nonquantitative data. Using our assessment method, different risk factors can be ranked according to their contributions to the environmental risk, thereby allowing the calculation of their relative priorities during decision making. Thus, environmental decision-makers can use this approach to develop alternative management strategies for proposed, ongoing, and completed PG tailing dams.

  5. Detection of subcritical crack propagation for concrete dams

    Institute of Scientific and Technical Information of China (English)

    BAO TengFei; YU Hong

    2009-01-01

    Subcritical propagation of cracks is a warning sign of fracture.If such propagation is detected at an early stage,timely maintenance measures can be taken to prevent the failure of structures.To detect the subcritical propagation of a crack,the crack needs to be monitored continuously in a long term,which is not realistic under certain conditions.However,cracks in concrete dams can be monitored continuously by dam monitoring to offer possible detection for subcritical propagation.In this paper,with measured crack openings from dam monitoring,a state equation for characterizing crack development is established based on the grey system theory.The relation between the stability of the equation and the subcritical crack propagation is investigated,then a criterion is proposed for detecting subcritical propagation.An example demonstrates the validity of the criterion and its potential for practical application.

  6. Historical patterns of river stage and fish communities as criteria for operations of dams on the Illinois River

    Science.gov (United States)

    Koel, T.M.; Sparks, R.E.

    2002-01-01

    The hydrologic regime of the Illinois River has been altered over the past 100 years. Locks and dams regulate water surface elevations and flow, enabling commercial navigation to continue year round. This study relates changes in water surface elevation to fish abundance in the river, and establishes target criteria for operating locks and dams. Using longterm records of daily river stage, we identified ecologically meaningful hydrological parameters for eight gage locations along the Illinois River. Inter-annual variability of a long-term fisheries dataset beginning in 1957 was related to variability in stage, flood and recession duration, frequency, timing, and rate of change of water levels. Reversals in water surface elevation, maximum stage levels, and lenght of the spring flood were the most important parameters influencing abundance of age-zero fishes in annual collections. Smallmouth buffalo (Ictiobus bubalus), black crappie (Pomoxis nigromaculatus), freshwater drum (Aplodinotus grunneins), and white bass (Morone chrysops) were most abundant in samples during years that approximated the natural water level regime. Of the 33 hydrologic parameters evaluated for the entire water year from an Illinois River gage site on La Grange Reach, all except average stage in January and Julian date (JD) of maximum stage had moderate or high hydrologic alteration based on the historical range of variation (RVA). The highest degree of hydrologic alteration was for minimum stage levels (1-day, 3-day, and 7-day), rate-of-rise, and rate-of-fall. Other parameters that have been severely altered were 30-day minimum stage, 90-day maximum stage, and the annual number of water level reversals. Operations of the La Grange and Peoria locks and dams could be modified so water level variability would approximate that of the late 1800s, when fish and wildlife resources were abundant. The water regime could be regulated to maintain navigation and improve conditions for native plants and

  7. Analysis of the behaviour of the Toulnoustouc CFRD Dam

    Energy Technology Data Exchange (ETDEWEB)

    Bouzaiene, H.; Chartrand, C. [RSW Inc., Montreal, PQ (Canada); Hammamji, Y. [Hydro-Quebec, Montreal, PQ (Canada)

    2006-07-01

    Concrete-face rockfill dams (CFRD) are typically designed using empirical methods which occasionally lead to leakage problems and the need for remedial measures. This paper argued that the application of numerical simulations in dam design may provide a greater understanding of CFRD dam behaviour. A 3D finite element method was used for the basic design of the Toulnustouc dam in Quebec. The interaction between the face concrete slabs, rockfill, and the rigid foundation was modelled with a specific emphasis on discontinuities of the concrete slabs. Data from a topographical survey was used to consider the rock excavation, dental concrete and the plinth alignment discontinuities. The rockfill modulus was calibrated using a 2D non-linear elastic model with plane deformation. Results of the modelling study were used to confirm the location of compression and tension joints for water stops design. The study showed that most of the joint sealing defects of CFRD dams were located at joints between slabs and at the plinth perimeter joint. Various analyses were then conducted to evaluate stress concentration in the reinforced concrete slabs and the variation of stresses with the rockfill deformation modulus as well as the contact points between the slab and the fill. It was observed that changes in plinth alignment introduced important tension stresses in the upstream face of the slabs within a band of 12 meters along the perimeter joint. Stresses were governed by the difference of rigidity of the fill and the developed friction forces between the fill and the slabs. It was concluded that the finite element model was useful in determining the behaviour of the CFRD dam. 3 refs., 15 figs.

  8. Environmental risk assessment of a dam during construction phase

    Directory of Open Access Journals (Sweden)

    S. Rezaian

    2016-12-01

    Full Text Available The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated by MIKE-11 model. In order to check whether or not the dam construction could affect the quality of the Gavi River, the physicochemical quality of the river water was also tested. Afterwards, a questionnaire was prepared containing an inventory of possible risks supposed to be induced by construction of Gavi Dam. The questionnaires were placed at disposal of experts to score the items based on their importance. The questionnaires were then analyzed using SPSS Software, version 16. According to which, a total number of 12 risk factors were identified. The dam construction risks were qualitatively assessed by preliminary hazard analysis. Based on the results, 3 of 12 identified risks were recognized unacceptable. The shortlisted risks were prioritized at final step using technique for order of preference by similarity to ideal solution. "Habitat fragmentation" with a weight of 0.3002, "water pollution" with a weight of 0.295, and "impacts on aquatics" with a weight of 0.293 were identified as three top priority flooding risks. Among the most important corrective measures for mitigation of the risks at construction phase can be pointed to "restoration of the land cover", “conservation of areas surrounding the dam as a new wildlife habitat", “prevention of water contamination”, and "conservation of fish spawning sites".

  9. Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia

    Science.gov (United States)

    Said, N. F. Md; Sidek, L. M.; Basri, H.; Muda, R. S.; Razad, A. Z. Abdul

    2016-03-01

    Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

  10. Crucial technologies in High the design of Xiluodu Super Arch Dam

    Institute of Scientific and Technical Information of China (English)

    Wang Renkun

    2012-01-01

    Some super high arch dams ( SHADs), like Xiluodu Arch Dam, after their heights reaching the magnitude of 300 m, confront lots of technical challenges in design and construction. Several crucial technologies of 6 SHADs will be reviewed and discussed in this and consecutive papers, including Xiluodu, Jinping I in China, Baktiary in Iran, ete. , on the topics of the research method, criterion for evaluation and engineering application of dam safety analysis and evaluation, reasonable dam base interface, dam shape optimization, comprehensive treatments of complex foundation, anti-seismic engineering, dam construction material, concrete placement and temperature control, instrumentation and monitoring of dam operation, etc. This paper will mainly focus on the overall safety of SHADs, reasonable dam base interface analysis and evaluation and their engineering application.

  11. Wear and Thermal Stress Analysis of Side Dam for Twin Roll Strip Casting

    Institute of Scientific and Technical Information of China (English)

    LI Chao-feng; DI Hong-shuang; ZHANG Xiao-ming; WANG Guo-dong; LIU Xiang-hua

    2004-01-01

    The side dam technology for twin roll strip casting was discussed. The effect of pre-heating temperature, material and design of side dam on the process stability and surface quality of products was analyzed. The wear and erosion of side dam for different steel grades were described. Two types of side dam designs, namely integral type and combined type, were used in the experiment, and the suitable position of side dam was determined by experiment. The results show that the combined side dam is better than the integral one in process stability and long service life. The temperature fields and thermal stress fields in side dam during strip casting were analyzed using the finite element analysis software, and the causes of side dam cracking were explained.

  12. Prediction of downstream geomorphological changes after dam construction: A stream power approach

    DEFF Research Database (Denmark)

    Brandt, Anders

    2000-01-01

    physical geography, hydrology, reservoirs, sediment transport, erosion, sedimentation, fluvial geomorphology, dams, river channel geometry......physical geography, hydrology, reservoirs, sediment transport, erosion, sedimentation, fluvial geomorphology, dams, river channel geometry...

  13. EnviroAtlas - National Inventory of Dams for the Conterminous United States

    Data.gov (United States)

    U.S. Environmental Protection Agency — This EnviroAtlas dataset is a summary of the National Dams Inventory data from 2009 survey. The file contains counts of inventoried dams by 12-digit hydrologic...

  14. Thermal margin comparison between DAM and simple model

    Energy Technology Data Exchange (ETDEWEB)

    Cha, Jeonghun; Yook, Daesik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2017-01-15

    The nuclear industry in Korea, has considered using a detail analysis model (DAM), which described each rod, to get more thermal margin with the design a dry storage facility for nuclear spent fuel (NSF). A DAM is proposed and a thermal analysis to determine the cladding integrity is performed using test conditions with a homogenized NSF assembly analysis model(Simple model). The result show that according to USA safety criteria, temperature of canister surface has to keep below 500 K in normal condition and 630 K in excess condition. A commercial Computational Fluid Dynamics (CFD) called ANSYS Fluent version 14.5 was used.

  15. Merowe Dam and the inundation of paleochannels of the Nile

    CERN Document Server

    Sparavigna, Amelia Carolina

    2010-01-01

    The course of the Nile in northern Sudan follows a contorted path through bedrocks, creating the Great Bend. Few years ago, the satellite images showed a fertile strip of land with villages, where paleochannels of the river hosted many fields with cultivations and archaeological sites. Now, a huge part of this valley is under the waters of Merowe Dam reservoir. Comparing the images of the region before and after the dam gates were closed, we can see that the reservoir created itself through flooding the paleochannels.

  16. Rollers in low-head dams - Challenges and solutions

    Science.gov (United States)

    Zamankhan, Piroz

    2012-12-01

    Low-head dams exist in many rivers for the purposes of diverting water for open-channel irrigation and providing power plants with cooling water. Flow over low-head dams is quite complex and dangerous rollers often develop down-stream that tend to trap and submerge floating objects. This paper presents an analysis of the problem based on physical and computational fluid dynamics (CFD) modeling and the result of this analysis in the form of design suggestions intended to diminish the hazards associated with rollers.

  17. 4th Optimization Day

    CERN Document Server

    Eberhard, Andrew; Ralph, Daniel; Glover, Barney M

    1999-01-01

    Although the monograph Progress in Optimization I: Contributions from Aus­ tralasia grew from the idea of publishing a proceedings of the Fourth Optimiza­ tion Day, held in July 1997 at the Royal Melbourne Institute of Technology, the focus soon changed to a refereed volume in optimization. The intention is to publish a similar book annually, following each Optimization Day. The idea of having an annual Optimization Day was conceived by Barney Glover; the first of these Optimization Days was held in 1994 at the University of Ballarat. Barney hoped that such a yearly event would bring together the many, but widely dispersed, researchers in Australia who were publishing in optimization and related areas such as control. The first Optimization Day event was followed by similar conferences at The University of New South Wales (1995), The University of Melbourne (1996), the Royal Melbourne Institute of Technology (1997), and The University of Western Australia (1998). The 1999 conference will return to Ballarat ...

  18. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  19. Seismic Fortification Analysis of the Guoduo Gravity Dam in Tibet, China

    OpenAIRE

    Peng Lin; Wenwei Zheng; Bo Huang; Haichao Zhang

    2015-01-01

    The primary aim of this research was to analyze the seismic performance of the Guoduo gravity dam. A nonlinear FEM method was implemented to study the deformation, stress, and overall stability of dam under both static and dynamic loading conditions, including both normal and overloading conditions. A dam seismic failure risk control method is proposed based on the cracking mechanism induced by the dynamic load to ensure dam safety and stability. Numerical simulation revealed that (1) under n...

  20. Past, Present, and Future Nutrient Quality of a Small Southeastern River: A Pre-Dam Assessment

    OpenAIRE

    Stewart, Paul M.; Miller, Jonathan M

    2013-01-01

    Riverine dams alter both the physical environment and water chemistry, thus affecting species assemblages within these environments. In the United States, dam construction is on the decline and there is a growing trend for dam removal. The Choctawhatchee, Pea, and Yellow Rivers Watershed Management Authority had initiated the permitting process for placing a reservoir dam on the Little Choctawhatchee River (LCR), a tributary to the Choctawhatchee River. The purpose of the proposed reservoir w...

  1. Klamath River Water Quality and Acoustic Doppler Current Profiler Data from Link River Dam to Keno Dam, 2007

    Science.gov (United States)

    Sullivan, Annett B.; Deas, Michael L.; Asbill, Jessica; Kirshtein, Julie D.; Butler, Kenna D.; Stewart, Marc A.; Wellman, Roy W.; Vaughn, Jennifer

    2008-01-01

    In 2007, the U.S. Geological Survey, Watercourse Engineering, and the Bureau of Reclamation began a project to construct and calibrate a water quality and hydrodynamic model of the 21-mile reach of the Klamath River from Link River Dam to Keno Dam. To provide a basis for this work, data collection and experimental work were planned for 2007 and 2008. This report documents sampling and analytical methods and presents data from the first year of work. To determine water velocities and discharge, a series of cross-sectional acoustic Doppler current profiler (ADCP) measurements were made on the mainstem and four canals on May 30 and September 19, 2007. Water quality was sampled weekly at five mainstem sites and five tributaries from early April through early November, 2007. Constituents reported here include field parameters (water temperature, pH, dissolved oxygen concentration, specific conductance); total nitrogen and phosphorus; particulate carbon and nitrogen; filtered orthophosphate, nitrite, nitrite plus nitrate, ammonia, organic carbon, iron, silica, and alkalinity; specific UV absorbance at 254 nm; phytoplankton and zooplankton enumeration and species identification; and bacterial abundance and morphological subgroups. The ADCP measurements conducted in good weather conditions in May showed that four major canals accounted for most changes in discharge along the mainstem on that day. Direction of velocity at measured locations was fairly homogeneous across the channel, while velocities were generally lowest near the bottom, and highest near surface, ranging from 0.0 to 0.8 ft/s. Measurements in September, made in windy conditions, raised questions about the effect of wind on flow. Most nutrient and carbon concentrations were lowest in spring, increased and remained elevated in summer, and decreased in fall. Dissolved nitrite plus nitrate and nitrite had a different seasonal cycle and were below detection or at low concentration in summer. Many nutrient and

  2. My Favorite Day

    Institute of Scientific and Technical Information of China (English)

    李峰

    2008-01-01

    It’s Friday, November 14th. I’m happy today. In1 8 o’clock I have Chinese. I like it because it’s fun. Then I have math and art. In2 this day I can have P.E. in the afternoon. That’s my favorite subject. I play football and basketball. Then I have a two-days3 holiday. At 6 o’clock p.m. I can swimming4 for an hour. In5 Friday evening I have a party with my friends.

  3. A continous Bayesian network for earth dams' risk assessment: methodology and quantification

    NARCIS (Netherlands)

    Morales-Napoles, O.; Delgado-Hernadez-D.J.; De-Leon-Escobedo, D.; Arteaga-Arcos, J.C.

    2013-01-01

    Dams’ safety is highly important for authorities around the world. The impacts of a dam failure can be enormous. Models for investigating dam safety are required for helping decision-makers to mitigate the possible adverse consequences of flooding. A model for earth dam safety must specify clearly p

  4. The Cemented Material Dam: A New, Environmentally Friendly Type of Dam

    National Research Council Canada - National Science Library

    Jinsheng Jia Michel Lino Feng Jin Cuiying Zheng

    2016-01-01

    The first author proposed the concept of the cemented material dam (CMD) in 2009. This concept was aimed at building an environmentally friendly dam in a safer and more economical way for both the dam and the area downstream...

  5. Characteristics of stress distribution in trapezoid-shaped CSG dam during earthquake

    Energy Technology Data Exchange (ETDEWEB)

    Kondo, M.; Kawasaki, H. [Ministry of Land, Infrastructure and Transport (Japan). Water Management and Dam Division; Sasaki, T. [Public Works Research Institute, Tsukuba (Japan). Hydraulic Engineering Research Group

    2004-07-01

    There is currently a shortage of dam sites with optimal conditions in Japan. Dam design and construction technologies must also respond to a growing demand for cost reductions and environmental concerns. Cemented Sand and Gravel (CSG) is a new dam construction material that reduces the costs of material production. However, it is not as strong as concrete. The trapezoid shape was proposed to resolve this problem, as a trapezoidal cross section can minimize stress inside the dam body and reduce fluctuations during earthquakes. This paper examines the effects of dam size and the deformability of the foundation ground on the dynamic behavior of a trapezoid-shaped CSG dam during an earthquake, as well as examining the differences between the dynamic behaviors of trapezoid-shaped CSG dams and conventional concrete gravity dams. Finite element models of both dams were used to conduct the comparison. Analysis results included stress distribution during usual loading conditions. It was concluded that stress generated inside the dam body of trapezoid-shaped CSG during earthquakes is considerably lower than concrete gravity dams with a conventional triangle shape. In addition, stress distribution inside the dam body is affected largely by the relative deformability of the foundation to CSG. 4 refs., 2 tabs.,12 figs.

  6. Landscape context and the biophysical response of rivers to dam removal in the United States

    Science.gov (United States)

    Foley, Melissa M.; Magilligan, Francis J.; Torgersen, Christian; Major, Jon J.; Anderson, Chauncey; Connolly, Patrick J.; Wieferich, Daniel; Shafroth, Patrick B.; Evans, James E.; Infante, Dana M.; Craig, Laura

    2017-01-01

    Dams have been a fundamental part of the U.S. national agenda over the past two hundred years. Recently, however, dam removal has emerged as a strategy for addressing aging, obsolete infrastructure and more than 1,100 dams have been removed since the 1970s. However, only 130 of these removals had any ecological or geomorphic assessments, and fewer than half of those included before- and after-removal (BAR) studies. In addition, this growing, but limited collection of dam-removal studies is limited to distinct landscape settings. We conducted a meta-analysis to compare the landscape context of existing and removed dams and assessed the biophysical responses to dam removal for 63 BAR studies. The highest concentration of removed dams was in the Northeast and Upper Midwest, and most have been removed from 3rd and 4th order streams, in low-elevation (landscape settings, which limits predictive capacity in other environmental settings. Biophysical responses to dam removal varied by landscape cluster, indicating that landscape features are likely to affect biophysical responses to dam removal. However, biophysical data were not equally distributed across variables or clusters, making it difficult to determine which landscape features have the strongest effect on dam-removal response. To address the inconsistencies across dam-removal studies, we provide suggestions for prioritizing and standardizing data collection associated with dam removal activities.

  7. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Science.gov (United States)

    2012-01-20

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of... 47897), the Office of Energy Projects has reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on...

  8. 75 FR 81464 - Safety Zone; Columbia River, The Dalles Lock and Dam

    Science.gov (United States)

    2010-12-28

    ... SECURITY Coast Guard 33 CFR Part 165 RIN 1625-AA00 Safety Zone; Columbia River, The Dalles Lock and Dam... temporary safety zone on the waters of the Columbia River in the vicinity of The Dalles Lock and Dam while... Dalles Lock and Dam (a) Location. The following is a safety zone: All waters of the Columbia...

  9. 76 FR 20707 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA

    Science.gov (United States)

    2011-04-13

    ... Bureau of Reclamation Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas... Environmental Impact Statement (FEIS) for the Cle Elum Dam Fish Passage Facilities and Fish Reintroduction... FEIS on the proposed Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project....

  10. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Science.gov (United States)

    2010-06-02

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final... Commission and is available for public inspection. a. Type of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric...

  11. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Energy Regulatory Commission Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In... reviewed the application for license for the Martin Dam Hydroelectric Project (FERC No. 349), located...

  12. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-05-09

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft... Energy Projects has reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River...

  13. 76 FR 54487 - Charter Renewal, Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2011-09-01

    ... Bureau of Reclamation Charter Renewal, Glen Canyon Dam Adaptive Management Work Group AGENCY: Bureau of... the Glen Canyon Dam Adaptive Management Work Group. The purpose of the Adaptive Management Work Group... of the Glen Canyon Dam Adaptive Management Work Group is in the public interest in connection...

  14. 78 FR 54482 - Charter Renewal, Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2013-09-04

    ... Bureau of Reclamation Charter Renewal, Glen Canyon Dam Adaptive Management Work Group AGENCY: Bureau of... the Glen Canyon Dam Adaptive Management Work Group. The purpose of the Adaptive Management Work Group... Canyon Dam Adaptive Management Work Group is in the public interest in connection with the performance...

  15. A continous Bayesian network for earth dams' risk assessment: methodology and quantification

    NARCIS (Netherlands)

    Morales-Napoles, O.; Delgado-Hernadez-D.J.; De-Leon-Escobedo, D.; Arteaga-Arcos, J.C.

    2013-01-01

    Dams’ safety is highly important for authorities around the world. The impacts of a dam failure can be enormous. Models for investigating dam safety are required for helping decision-makers to mitigate the possible adverse consequences of flooding. A model for earth dam safety must specify clearly p

  16. Fish assemblage response to a small dam removal in the Eightmile River system, Connecticut, USA.

    Science.gov (United States)

    Poulos, Helen M; Miller, Kate E; Kraczkowski, Michelle L; Welchel, Adam W; Heineman, Ross; Chernoff, Barry

    2014-11-01

    We examined the effects of the Zemko Dam removal on the Eightmile River system in Salem, Connecticut, USA. The objective of this research was to quantify spatiotemporal variation in fish community composition in response to small dam removal. We sampled fish abundance over a 6-year period (2005-2010) to quantify changes in fish assemblages prior to dam removal, during drawdown, and for three years following dam removal. Fish population dynamics were examined above the dam, below the dam, and at two reference sites by indicator species analysis, mixed models, non-metric multidimensional scaling, and analysis of similarity. We observed significant shifts in fish relative abundance over time in response to dam removal. Changes in fish species composition were variable, and they occurred within 1 year of drawdown. A complete shift from lentic to lotic fishes failed to occur within 3 years after the dam was removed. However, we did observe increases in fluvial and transition (i.e., pool head, pool tail, or run) specialist fishes both upstream and downstream from the former dam site. Our results demonstrate the importance of dam removal for restoring river connectivity for fish movement. While the long-term effects of dam removal remain uncertain, we conclude that dam removals can have positive benefits on fish assemblages by enhancing river connectivity and fluvial habitat availability.

  17. Examination of physical and regulatory variables leading to small dam removal in Wisconsin.

    Science.gov (United States)

    Orr, Cailin H; Roth, Brian M; Forshay, Kenneth J; Gonzales, James D; Papenfus, Michael M; Wassell, Rebecca D G

    2004-01-01

    The decision to remove or repair a dam depends on multiple variables, many of which encompass both physical and social factors. In Wisconsin, the Department of Natural Resources is mandated to inspect small dams every ten years. A safety inspection often acts as a trigger event to a dam removal or repair decision. Although the issues surrounding a dam removal decision are often couched as ecological, these decisions are influenced by their social and regulatory context. In this work, we examine descriptive variables of Wisconsin dams that were inspected and consequently removed or maintained between 1985 and 1990. We hypothesize that geographic location, height of dam, size of impoundment, age of dam, and type of ownership determine the likelihood of a safety inspection, and the subsequent likelihood of removal. Using a logistic model, we find that publicly owned dams had the greatest probability of inspection after 1985. Of these dams, older dams and those with smaller impoundments were most likely to be removed. We were unable to build a strong predictive model for dam removal with our suite of variables, suggesting that a community's decision to remove or maintain a dam is complex and heterogeneous.

  18. 33 CFR 208.82 - Hetch Hetchy, Cherry Valley, and Don Pedro Dams and Reservoirs.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Hetch Hetchy, Cherry Valley, and..., Cherry Valley, and Don Pedro Dams and Reservoirs. The Turlock Irrigation District and Modesto Irrigation..., shall operate Hetch Hetchy Dam and Reservoir and Cherry Valley Dam and Reservoir in the interest...

  19. Geotechnical sounding of the UTE-Uruguay dams; La auscultacion geotecnica de las presas de UTE

    Energy Technology Data Exchange (ETDEWEB)

    Patrone Matteo, Julio C.; Rosriguez Pastorino, Sandra; Mandia Bica, Magdalena [Administracion Nacional de Usinas e Transmisiones Electricas (UTE), Montevideo (Uruguay)]. E-mail: gsgh@ute.com.uy

    1998-07-01

    This paper addresses specifically to the soil dams, and soil dikes of the Constitucion Dam, which is presently the most instrumented, considering that the set of inspection routine and instrumentation data, including the interpretation and behaviour evaluation, are the basis for the dam sounding.

  20. Landsat Image Analysis of the Rebea Agricultural Project, Mosul Dam and Lake, Northern Iraq

    Science.gov (United States)

    Welsh, W.; Alassadi, F.

    2014-12-01

    An archive of 70 good-to-excellent quality Landsat TM and ETM+ images acquired between 1984 and 2011 were identified through visual examination of the GLOVIS web portal. After careful consideration of factors relevant to agriculture in the region (e.g., crop calendar) and associated image processing needs (e.g., preference for anniversary dates), the images deemed most appropriate were downloaded. Standard preprocessing, including visual quality and statistical inspection, sub-setting to the study area, was performed, and the results combined in a database with available GIS data. The resolution merge spatial enhancement technique was applied to any ETM+ imagery to improve visual clarity and interpretability. The NDVI was calculated for all images in the time series. Unsupervised classification of images was performed for dates ranging from 1987 just before the inception of the Rebea project in 1989 through 2011. In order to reduce uncertainty related to lack of detailed ancillary and/or ground reference data, simple land cover classes were mapped, specifically: surface water, agriculture, and other. Results were able to quantify and track areas of each class over time, and showed a marked decrease in agriculture between the Iraq invasion in 2003 to the end of the study period in 2011, despite massive efforts and capital by the United States and Iraqi governments to improve agriculture in the area. Complications to understanding the role of warfare and conflict on the environment in the Mosul region include severe drought and water shortages, including effects of the Turkish GAP water resource development project in the headwaters of the Tigris-Euphrates, as well as Mosul Dam structural problems associated with geologically-unsuitable conditions upon which the dam is constructed. Now, the Islamic State in Iraq and Syria (ISIS) likely captured the Mosul Dam on the day this abstract was submitted. Our Landsat-based monitoring and analysis of the Rebea Project and